I-70 Wolcott East

Project Facts

  • Cost: $11.1 million

Project Team

  • Contractor(s): United Companies of Grand Junction

Project Duration

  • March 20, 2017 - March 2018

From March 20, 2017, to early March 2018, crews on this project improved the driving surface and safety features on I-70, from west of Edwards to Avon. Approximate mile points are 159.5 to 167, with additional bridge work at 158.8.

Work included:

  • resurfacing a 7.5-mile stretch of distressed pavement within the project limits;
  • making bridge rail and deck repairs on nine structures;
  • lining one large deteriorated culvert under I-70;
  • extensively upgrading and replacing guardrail on various sections along each side of the highway for the entire length of the project; and
  • making minor lighting improvements to the wiring at the Edwards interchange.