Assets
Polyester concrete overlays on bridge from I-70 East to Washington Street ramp, and I-25 south ramp to I-70 east (after). Polyester concrete overlay was placed to waterproof and protect the bridge deck with a durable material (July 2018).
Polyester concrete overlays on bridge from I-70 East to Washington Street ramp, and I-25 south ramp to I-70 east (before)
Roadway panel replacement on I-25 south ramp to I-70 east (after). Panels were replaced due to extensive cracking and failure in the concrete (May 2018).
Roadway panel replacement on I-25 South ramp to I-70 East (before)