I-70 Barrier & Median Improvements in Genesee, Morrison & Denver

Project complete

Project Facts

  • Cost: $1.8 million
  • Contractor: Crus Construction Incorporated
  • Timeline: November 2018 to April 2019
  • Location: Three sites on I-70:
    • Site 1: I-70 between the Lookout Mountain and Chief Hosa interchanges (mile points 252.7 to 255.3)
    • Site 2: I-70 between the Morrison Road and C-470 interchanges (mile points 258.5 to 259.8)
    • Site 3: West the of I-70/I-270 interchange, and the east side of Quebec Street overpass (mile points 4.4 to 5.1)

Project Overview

From November 2018 through April 2019, crews on this project will improve three sections of I-70 in Jefferson and Denver counties by replacing and installing median barrier, bringing the median safety measures up to current standards.

Work will be done at the following locations:

  1. Site 1: I-70 between the Lookout Mountain and Chief Hosa interchanges (mile points 252.7 to 255.3)
  2. Site 2: I-70 between the Morrison Road and C-470 interchanges (mile points 258.5 to 259.8)
  3. Site 3: West the of I-70/I-270 interchange, and the east side of Quebec Street overpass (mile points 4.4 to 5.1)

Schedule & Travel Impacts

  • Expect single-lane closures and shoulder closures.
  • Expect trucks and equipment entering and exiting the work zone.
  • Work is scheduled to run from November 2018 through April 2019.