You are here: Home Projects Archived Project Sites I-25 Southbound Bottleneck Mitigation Photo Gallery Photo Gallery https://www.codot.gov/projects/archived-project-sites/i-25-southbound-bottleneck-mitigation/photo-gallery https://www.codot.gov/@@site-logo/siteLogo.png Photo Gallery I-25 Project Location - map.JPG Intermittent shoulder closures week of March 8 to 14 (1).JPG Map overnight lane closures march 10 to 12.JPG On ramp southbound I-25 at 58th Avenue.jpg On-ramp shoulder 58th Avenue will be intermittently closed.jpg Shoulder at MP 215 will be closed for start of construction.jpg Annular space of dowel bar retrofit after concrete removal.jpg Area of asphalt removal south of 58th.jpg Sawcutting existing concrete shoulder to retrofit the existing joints by installing Dowel Bars..jpg View of shoulder construction behind barrier at Exit 215.jpg Dowel bars in the chipped and cleaned pockets.jpg Grouted dowel bar keyway.jpg Removal of existing Asphalt shoulder – Prep for new concrete shoulder (1).jpg Cleaning Dowel Pockets.jpg Completed Dowel Bar Installation.jpg Flush Grinding Dowel Pockets.jpg Concrete paving for future auxilury lane.jpg Concrete Paving Subgrade Prep (1).jpg Prep for Tie Bar Installation.jpg Closeup of new paved shoulder southbound I-25.jpg South view of newly paved auxiliary lane.jpg Slope paving under the 58th Ave Bridge.jpg South view of completed shoulder widening and backfill.jpg Northeast view slope paving and guardrail.jpg South view new slope paving and guardrail..jpg South view new widened shoulder and auxiliary lane.jpg Northeast view of new auxiliary lane.jpg southbound view of finished auxiliary lane.jpg Completed auxiliary lane I-25 at 58th Ave.jpg New auxiliary lane with seeding and guardrail.jpg New lane with slope Paving under 58th Ave bridge Closeup guardrail and seeding at I-25 58th Ave.jpg Seeding and stabilization in place SB I-25 58th Ave.jpg Advance dection base and pole - 58th Ave.jpg Service cabinet base - 58th Ave on ramp meter.jpg Electrical crews setting signal pole at 58th Avenue on ramp.jpg new signal cabinet.jpg new service cabinet base.jpg New signals for ramp meter at the 58th Avenue on ramp.jpg New signal poles and advance detection equipment.jpg Close up new ramp metering equipment.jpg South view 58th Ave on ramp to SB I-25.jpg Wide shot new signals and metering equipment on ramp 58th Ave to SB I-25.jpg
Photo Gallery https://www.codot.gov/projects/archived-project-sites/i-25-southbound-bottleneck-mitigation/photo-gallery https://www.codot.gov/@@site-logo/siteLogo.png Photo Gallery I-25 Project Location - map.JPG Intermittent shoulder closures week of March 8 to 14 (1).JPG Map overnight lane closures march 10 to 12.JPG On ramp southbound I-25 at 58th Avenue.jpg On-ramp shoulder 58th Avenue will be intermittently closed.jpg Shoulder at MP 215 will be closed for start of construction.jpg Annular space of dowel bar retrofit after concrete removal.jpg Area of asphalt removal south of 58th.jpg Sawcutting existing concrete shoulder to retrofit the existing joints by installing Dowel Bars..jpg View of shoulder construction behind barrier at Exit 215.jpg Dowel bars in the chipped and cleaned pockets.jpg Grouted dowel bar keyway.jpg Removal of existing Asphalt shoulder – Prep for new concrete shoulder (1).jpg Cleaning Dowel Pockets.jpg Completed Dowel Bar Installation.jpg Flush Grinding Dowel Pockets.jpg Concrete paving for future auxilury lane.jpg Concrete Paving Subgrade Prep (1).jpg Prep for Tie Bar Installation.jpg Closeup of new paved shoulder southbound I-25.jpg South view of newly paved auxiliary lane.jpg Slope paving under the 58th Ave Bridge.jpg South view of completed shoulder widening and backfill.jpg Northeast view slope paving and guardrail.jpg South view new slope paving and guardrail..jpg South view new widened shoulder and auxiliary lane.jpg Northeast view of new auxiliary lane.jpg southbound view of finished auxiliary lane.jpg Completed auxiliary lane I-25 at 58th Ave.jpg New auxiliary lane with seeding and guardrail.jpg New lane with slope Paving under 58th Ave bridge Closeup guardrail and seeding at I-25 58th Ave.jpg Seeding and stabilization in place SB I-25 58th Ave.jpg Advance dection base and pole - 58th Ave.jpg Service cabinet base - 58th Ave on ramp meter.jpg Electrical crews setting signal pole at 58th Avenue on ramp.jpg new signal cabinet.jpg new service cabinet base.jpg New signals for ramp meter at the 58th Avenue on ramp.jpg New signal poles and advance detection equipment.jpg Close up new ramp metering equipment.jpg South view 58th Ave on ramp to SB I-25.jpg Wide shot new signals and metering equipment on ramp 58th Ave to SB I-25.jpg