I-25 Resurfacing South of Trinidad
Project Facts
- Cost: $5.4 million
- Contractor(s): APC Southern Contractors
- Location: On I-25 from mile points 7.5 to 12.9 in Las Animas County
- Timeline: April - September 2018
On Monday, April 2, crews began improving sections of I-25 at Raton Pass. Work is scheduled to be complete in September 2018.
This work will include:
- resurfacing the road;
- repairing a bridge; and
- improving guardrail.
Schedule
- Work hours: 7 a.m. to 7 p.m., Mondays through Fridays
- No weekend work is currently anticipated.
Travel Impacts
- From April 9-12, there will be 24-hour, 12-foot-width reduction on northbound I-25 at mile point 10.4. Concrete barrier will be in place as will a speed-limit reduction of 45 mph.
- Expect work crews in and around the CDOT Port of Entry, south of Trinidad.
- Allow for travel delays of up to 15 minutes due to traffic being reduced to one lane.
- All business owners and residents will maintain access to their property, though it may be temporarily altered.