I-25 Near Aguilar
Project Facts
- Cost:
$8 million
Project Team
- Contractor(s): APC Southern
Crews paved the road with asphalt and performing bridge work.
This project:
- Improved the surface of the road.
- Upgraded guardrail in some locations.
- Brightened striping and signage to enhance safety.
- Extendws the life of the bridge.
The project kicked off in March 2016 and was completed in October 2016.