CO 119 Repairs Between Boulder & Longmont
Project completed
Project Facts
- Cost: $12 million
- Contractor: Asphalt Specialties
- Project Area: Colorado Highway 1198 between Boulder and Longmont
Project Overview
From May through October 2016, CDOT repaired Colorado Highway 1198 between Boulder and Longmont. Work included:
- Overlaying the road with 4 inches of asphalt, with sections of both five-inch mill-and-fill overlay
- Replacing guardrail and bridge rail
- Minor bridge rehab work
- Replacing signs