Photo Gallery
 
Finished deck pour bridge CO-10
 
Wide shot of new bridge over crooked arroyo
 
Riprap between abutments new bridge
 
East view of new bridge
 
Close up new bridge nearing completion
 
Crews are working on components of the superstructure
 
Deck placement and falsework bridge on CO 10
 
Expansion joint placement on new bridge on CO 10
 
Crews preparing to lower deck onto bridge superstructure
 
Crews lower new deck onto bridge superstructure
 
Cranes lifting prepoured bridge deck
 
On-site plant manufacture caissons
 
Demolition of superstructure
 
Demolition of superstructure
CO 10 Bridge, La Junta
CO 10 bridge: current condition
CO 10 bridge over the Crooked Arroyo
 
CO 10 facing west from bridge site
 
Construction of new substructure
 
Crews are preparing abutments and piers for new CO 10 bridge
 
Riprap between abutments at CO 10 for new bridge
 
New columns and abutments bridge at CO 10
 
New poured bridge deck ready to be placed
 
Onsite plant mobilization for superstructure
 
New bridge just prior to reopening
 
CO 10 repaved and striped at zone
 
Closeup of new erosion 
control on CO 10 bridge
 
Reinforced guardrail on new bridge
 
Wide shoulders on new CO 10 bridge
 
Bridge on CO 10 is complete
 
CO 10 bridge includes new erosion control
 
Finished bridge west view
 
Wide shot of new bridge