CO 92 Hotchkiss to Crawford Resurfacing
Project Complete!
United Companies crews are now working on the north side of Bridge Street. Work will begin on the east side of Cedar Street and proceed to the east. Work will consist of potholing, utility locates, ADA ramp demo and form prep, irrigation pipe repair or replacement, and roadway excavation. The work on the north side is anticipated to require about four to five weeks. The speed limit through the reconstruction work zone is a maximum of 25 mph.
Resurfacing work for the CO 92 Hotchkiss to Crawford project is scheduled to start later in July, once the US 50 closures have wrapped up. More info about the US 50 Little Blue Creek Canyon project can be found at www.us50info.com.
Work Schedule
- Work is scheduled Monday-Friday, 7 a.m. to 7 p.m.
- Resurfacing work from Hotchkiss to Crawford will begin after the 4th of July holiday. Motorists should expect single lane, alternating traffic and delays up to 15 minutes during this work. The resurfacing phase is scheduled to start at this date to accommodate the US 50 Little Blue Creek Canyon detour traffic.
Traffic Impacts
- Barriers on Bridge Street have been removed and all lanes will be opened for traffic by July 28. Work on Bridge Street is essentially complete with a few remaining items to finish such as some ADA ramp repairs and side street patching. These repairs will occur the week of August 8. For the coming week, the project will be shut down within town limits for the Delta County Fair.
- Resurfacing work for the CO 92 Hotchkiss to Crawford project is anticipated to start the week of August 15. The schedule was planned to accommodate daytime full closures of US 50 associated with the Little Blue Creek Canyon project. Daytime full closures are now complete; however, nighttime full closures of US 50 are still in place. More info about the US 50 Little Blue Creek Canyon project can be found at www.us50info.com.
Project Facts
- Cost: TBD
- Contractor: United Companies
- Timeline: May 2022-July 2022
- Location: Colorado Highway 92 from Hotchkiss to Crawford, Mile Points 19-31