CO 14 Paving from Briggsdale to New Raymer
Project completed
About the Project
Colorado Department of Transportation will begin milling and paving on State Highway (CO) 14 between Briggsdale and New Raymer from mile point (MP) 194.14 to MP 202.80. Crews will first mill the roadway surface, then repave, followed by striping the roadway. This project was awarded to Simon Contractors.
This project will improve safety by replacing worn stretches of asphalt, reinforcing asphalt along the roadway, and installing rumble strips along the shoulders of the road.
Project Facts
- Cost: $5.4 million
- Contractor: Simon Contractors
- Timeline: May to July 2020
- Location: CO 14 between Briggsdale and New Raymer
Proposed Work Schedule
- This project is scheduled to begin May 4, 2020. Work is expected to be completed by July 2020.
- Regular work hours will be Monday – Friday, between 7 a.m. and 6 p.m.
Traffic Impacts
- All motorized vehicles should expect travel impacts throughout the construction of this project.
- Flagging operations will be in effect. Motorists should be aware of lane closures and lane shifts.
- Speed reduction to 40 MPH will be in effect. Motorists are urged to obey speed reductions and watch for construction personnel and equipment in the work zone.
- 16-foot width restriction in place.
- 40 mph speed limit in force.