CO 115 and CO 9 Critical Culverts
About the Project:
SH 9 - MP 27.77: Slip line and Extend Culvert, Place Grouted Riprap and Riprap at Outlet, Temporary Signal will be used for Traffic Control at this location.
SH 115 - MP 42.41: Spray line Culvert, Excavate Material, Grade Ditch Slopes, and line ditch with Concrete at Outlet, Place Riprap and construct small maintenance access road at Outlet.
Work Schedule
- To be determined
Traffic Impacts
- To be determined
Project Facts
- Cost: $700,000
- Contractor: American West Construction
- Timeline: July through Late August 2021
- Location: SH 9 - MP 27.77 in Park County, SH 115 - MP 42.41 in El Paso County