CO 9 & US 6 in Dillon Resurfacing
Project complete
Project Facts
- Cost: $11 million
- Annual Daily Traffic: 31,000
- Location:
- CO 9, mile points 101.6 to 107.0
- CO 6, mile points 208.7 to 210.7
Project Team
- Contractor(s): APC Southern Construction Company, LLC
Project Overview
From Monday, April 24, 2017, to Thursday, Oct. 19, 2017, crews made improvements to Colorado Highway (CO) 9 and US Highway 6, near I-70 in Dillon.
Project work included:
- roadway repaving;
- installing ADA-compliant ramps;
- installing sidewalks;
- traffic loops; and
- drainage improvements.
Phased Work
Phase 1 Work:
- removing and replacing curbs and gutters along CO 9
Phase 2 Work:
- excavations, followed by drainage improvements and paving operations
Phase 3 Work:
- milling and overlay operations, allowing the asphalt to line up with the new concrete improvements