CO 145 Culvert Installation Near Telluride
Project complete
Project Background
Project Facts
- Cost:
$495,861
Project Team
- Contractor(s):
Kirkland Construction
From Wednesday, Sept. 6, through October 2017, crews installed a concrete culvert beneath Colorado Highway 145 near Telluride. Work took place seven miles north of the roundabout (between mile points 79.9 and 80.1), in Sawpit, Colorado.
Crews also conducted erosion control on the highway embankment before seeding and mulching.