CO 138 Bridge Replacement, Paving & ADA Upgrades

Project Facts

  • Cost: $2.3 million
  • Contractor: Simon Contractors
  • Timeline: May - October 2018
  • Location: Work extends from mile points 50.6 to 54.4 on CO 138, with bridge work taking place around mile point 50.7

Project Overview

Starting Monday, May 21, crews on this project began replacing a bridge on Colorado Highway 138 in Ovid, Colorado, in Sedgwick County—just south of the Nebraska border.

Other work includes:

  • paving the highway
  • upgrading curb ramps to comply with current Americans with Disabilities Act (ADA) standards
  • grading channels near the bridge, and repairing erosion-prevention material (aka, riprap)