CO 121 Rehabilitation in Lakewood

Project completed

Project Facts

  • Cost: $5.2 million
  • Contractor: Martin Marietta Materials
  • Timeline: March to December 2019
  • Location: CO 121 (Wadsworth Boulevard) between Hampden Avenue and US 6 in Lakewood

Project Overview

Crews on this project have repaired more than three miles of Wadsworth Boulevard (aka Colorado Highway 121) between Hampden Avenue and US Highway 6 in the City of Lakewood. Specific work included:

  • installing and replacing 81 concrete curb ramps to comply with the Americans With Disabilities Act
  • resurfacing and patching
  • adjusting manholes
  • installing signs
  • restriping the highway