Exit 241 Reconfiguration

Exit 241 Graphic

Work to reconfigure the Exit 241 interchange and rebuild the Colorado Boulevard Bridge over I-70 started in April 2015 and was completed in fall 2015.

The new bridge structure was built immediately east of the existing structure, which remained open to traffic until vehicles were moved onto the new structure in fall 2015.