Documents
Pre-bid meeting information: | |
2007 Pre-Bid Minutes Final | |
2007 Pre-Bid Attendance | 2007 Contractor Pre-Bid Meeting |
Preconstruction Reports and Information:
Phase I Site Inspection
Structure Concept Report
-
Appendix B
-
Appendix C
-
Appendix D
Structural Selection Report
- Table of Contents
- Chapter 1
- Chapter 2
- Chapter 3
- Chapter 4
- Chapter 5
- Appendix A Plans
- Appendix B Bridge Design Criteria
- Appendix C Cost Estimates
- Appendix D RR Impact Cost Analysis
- Appendix E CDOT Inspection Report