Design Phase and SWMP Development Tools
The CDOT Landscape Architecture Section is excited to offer tools for use on CDOT projects to help improve revegetation success. Please first read the Instructions, and please contact the CDOT LA Section staff with any questions regarding the documents.
Subsoil and Topsoil Preparation, Amendments, and Seeding
- Revision of 207 - Subsoil and Topsoil - This Project Special Provision allows for flexibility in depths of subsoil and topsoil preparation. Please provide any comments based on your use in design or construction to Pamela Cornelisse - [email protected].
us. - Revision of 212 - Soil Amendments, Seeding, and Sodding
- Instructions for using 207 and 212 during the development of the SWMP
Topsoil Testing
- Topsoil Testing Procedure
- CSU Soil Testing Lab Fillable Form
- CSU Soil Testing Lab Sample Form
- Weld Lab Fillable Form
- Weld Lab Sample Form
- Ward Lab Fillable Form
- Ward Lab Sample Form
- Topsoil Amendment Calculator
If you are unable to read all information contained in these documents, please contact us at (303) 757-9542 or [email protected], and we will assist you.