Military Access, Mobility & Safety Improvement Program Updates for Week of Feb. 11, 2024
Travel Advisory
Update: The temporary full closure of the northbound South Academy Boulevard off-ramp to US 85/87 has been rescheduled to include two nights due to weather impacts. The closure is now scheduled for Thursday, Feb. 15, 8 p.m. to Friday, Feb. 16, 4 a.m. and Friday, Feb. 16, 7 p.m. to Saturday, Feb. 17, 2 p.m., to allow crews to install drainage pipe across the roadway.
Full closure of US 85/87 on-ramp from northbound South Academy Boulevard:
- Thursday, Feb. 15, 8 p.m. to Friday, Feb. 16, 4 a.m.
- Friday, Feb. 16, 7 p.m. to Saturday, Feb. 17, 2 p.m.
El Paso County – MAMSIP – South Academy Boulevard Widening Project
Colorado Springs — The temporary full closure of the northbound South Academy Boulevard off-ramp to US 85/87 planned for Friday, Feb. 9 has been rescheduled due to weather impacts. The closure is now scheduled for Friday, Feb. 16, 7 p.m. to Saturday, Feb. 17, 11 a.m., to allow crews to perform drainage work across the roadway.
Full closure of US 85/87 off-ramp from northbound South Academy Boulevard:
- Friday, Feb. 16, 7 p.m. to Saturday, Feb. 17, 11 a.m.
A detour will be in place:
- Traffic intending to exit to US 85/87 from northbound South Academy Boulevard will continue north, turn right to exit onto Bradley Road, turn right and travel under the South Academy bridge, turn onto the entrance to southbound South Academy, and continue south to the US 85/87 exit.
A detour remains in place for westbound travel on South Academy Boulevard between US 85 and I-25 over Fountain Creek. Two eastbound lanes on South Academy Boulevard are open, along with a single westbound lane using the eastbound South Academy bridge over Fountain Creek. Speeds across the detour cross over lanes and across the bridge will be reduced to 35 MPH.
Bridge lanes will be 11 feet wide with a 2-foot shoulder. Oversize loads will not be allowed on the bridge during this closure. The closure of the westbound South Academy Boulevard bridge is ongoing for scour bridge investigation and countermeasures.
Motorists are advised to use caution at all entrance ramps as merge lengths have been shortened. In particular, motorists should be prepared to stop on the US 85/87 on-ramp to eastbound South Academy since merge area is greatly reduced. Work crews have installed signage and flashing beacons to alert traffic to the new lane lengths.
All lanes of Bradley Road under South Academy Boulevard shifted to the center of the roadway ongoing to allow crews to perform work on new bridge piers.
A left lane closure is ongoing for northbound and southbound South Academy Boulevard over Bradley Road to allow crews to perform bridge work.
Nighttime work on I-25 between US 85/Fountain (MP 127) and South Academy Boulevard (MP 135)
There will be a southbound I-25 left lane closure at Santa Fe Avenue on Tuesday night, Feb. 13, 7 p.m. to 6 a.m., to allow crews to shift lanes of traffic.
These closures are weather dependent and subject to change.
Traffic Impacts
South Academy Boulevard Widening Project
- Friday, Feb. 16, 7 p.m. to 11 a.m.
- Full closure of US 85/87 off-ramp from northbound South Academy Boulevard
- Ongoing full closure of westbound South Academy Boulevard over Fountain Creek –detour in place
- Ongoing northbound and southbound left lane closure at South Academy Boulevard over Bradley Road
- Ongoing shift of all lanes on Bradley Road under South Academy Boulevard bridge
- Ongoing closure of the Fountain Creek Regional Trail under South Academy Boulevard
Nighttime work on I-25 between US 85/Fountain (MP 127) and South Academy Boulevard (MP 135)
- Tuesday, Feb. 13, 7 p.m. to 6 a.m.
- Southbound I-25 left lane closure at mile 128
Project Overview
Interstate-25 – Safety and Efficiency Improvements
The improvements to I-25 addressed in this project are located along an approximately 7.5-mile segment of south I-25 beginning at South Academy Boulevard and extending to the Santa Fe Avenue (U.S. 85/87) exit at Fountain (MP 128), which exits to Gate 19 of Fort Carson. The project includes:
- Replacement of two bridges crossing over South Academy Boulevard
- Widening of both inside and outside shoulders and installing safety improvements
- Concrete surface treatment overlay to provide an improved riding surface
- Installation of median barrier
- Rehab and widening work on four bridges
- Installation of an I-25 southbound deceleration lane at the interchange with CO 16
South Academy Boulevard Widening Project
The improvements to South Academy Boulevard in this project are located on South Academy Boulevard at the southern mile and a half of this arterial road from the I-25 interchange, crossing U.S. Highway 85/ 87, and continuing to the road’s approach to Milton Proby Parkway (which connects to Powers Boulevard/CO 21). Construction focuses on widening an approximately 1.5-mile section of South Academy Boulevard from two lanes to three in each direction to alleviate recurring congestion. The project includes improved drainage facilities, lighting, striping, and expanded shoulders, modified merge lanes, sound walls and bridgework. The project is expected to be complete by early 2026. This project is managed by El Paso County.
Safety Benefits
CDOT conducted a safety assessment for the corridor to evaluate the magnitude and nature of safety problems and analyze the causes of crashes. These transportation improvements are mitigation measures to reduce crashes, improve infrastructure, and address physical deficiencies that contribute to crashes in the corridor. Over the next 20 years, the project is estimated to result in fewer deaths, injuries and crashes on the four MAMSIP corridors.
Project Contact Information
- Website: codot.gov/projects/militaryaccesssafetyimprovements
- Email: [email protected]
- Hotline: 719-800-2162
- Register for Alerts: Text MAMSIP to 888-970-9665
About the Military Access, Mobility & Safety Improvement Program Build Grant
Colorado Department of Transportation (CDOT) has initiated a program to deliver more efficient and safer mobility along I-25, Colorado Highway 94, South Academy Boulevard, and Charter Oak Ranch Road, enabling economic stability and development. The Military Access, Mobility & Safety Improvement Program is partially funded through an $18 million BUILD grant award from the US Department of Transportation. The delivery of these improvements will strengthen and enhance the redundancy of strategic movement between the nationally significant El Paso County military installations of Fort Carson, Peterson Space Force Base, Cheyenne Mountain Space Force Station, and Schriever Space Force Base.
Know Before You Go
Travelers are urged to “know before you go.” Gather information about weather forecasts and anticipated travel impacts and current road conditions prior to hitting the road. CDOT resources include:
- Road conditions and travel information: COtrip.org
- Download the COtrip Planner app: bit.ly/COtripapp
- Sign up for project or travel alerts: bit.ly/COnewsalerts
- See scheduled construction lane closures: bit.ly/laneclosures
- Connect with @ColoradoDOT on social media: Twitter, Facebook, Instagram and YouTube
Remember: Slow For The Cone Zone
The following tips are to help you stay safe while traveling through maintenance and construction work zones.
- Do not speed in work zones. Obey the posted speed limits.
- Stay Alert! Expect the unexpected.
- Watch for workers. Drive with caution.
- Don't change lanes unnecessarily.
- Avoid using mobile devices such as phones while driving in work zones.
- Turn on headlights so that workers and other drivers can see you.
- Be especially alert at night while driving in work zones.
- Expect delays, especially during peak travel times.
- Allow ample space between you and the car in front of you.
- Anticipate lane shifts and merge when directed to do so.
- Be patient!
Download the COtrip App!
The new FREE COtrip Planner mobile app was designed to meet the growing trend of information on mobile and tablet devices for the traveling public. The COtrip Planner app provides statewide, real-time traffic information, and works on mobile devices that operate on the iOS and Android platforms. Visit the Google Play Store (Android devices) or the Apple Store (iOS devices) to download!