US 160 chip seal operations begin August 19 near Yellow Jacket Creek
Travel Advisory
Archuleta and La Plata Counties - On Monday, Aug. 19, crews will be chip sealing on US Highway 160 starting approximately 16 miles east of Bayfield near Yellow Jacket Creek (Mile Point 118) and moving westbound toward Bayfield. Crews will be working in two mile sections a day and motorists should plan for 20 to 30 minute delays between 6 a.m. and 9 p.m.
After chip seal operations are complete along the 16 mile segment of highway, the surface must cure for 14 days, then the roadway will receive permanent striping. Due to current wet weather conditions, delays in operations may be possible.
Traffic Impacts
Working hours will be from 6 a.m. to 9 p.m., Monday through Friday. Traffic impacts will include:
- Single-lane alternating traffic guided by traffic control operations and a pilot car
- The speed limit will be reduced to 40 mph in the work zone
- Plan ahead and expect up to 20 to 30 minute delays
- Construction schedules could change depending on the weather
Driving Through Chip Seal Projects
Travelers are urged to:
- Slow down - Higher speeds can cause loose stones to scatter, and damage vehicle paint and windshields
- Increase distance between vehicles - Space between you and other vehicles will help reduce damage caused by loose stones
- Follow work zone signage - Use caution and consider worker safety when traveling through a work zone
Project Information
For additional information about this project:
- Call the project information line at 970-718-5163
- Email the project team at: [email protected]
- Visit the project website at: codot.gov/projects/us160roadwayswco
Know Before You Go
Travelers are urged to “know before you go.” Gather information about weather forecasts, anticipated travel impacts and current road conditions before hitting the road. CDOT and other resources include:
- Road conditions and travel information website: COtrip.org
- Chain and traction law information: codot.gov/travel/winter-driving/tractionlaw
- Sign up for project or travel alerts: bit.ly/COnewsalerts
- See scheduled lane closures: bit.ly/laneclosures
- Connect with @ColoradoDOT on social media: Twitter, Facebook, Instagram and YouTube
- Weather forecasts: www.weather.gov
- Check avalanche conditions at CAIC: www.avalanche.state.co.us
Remember: Slow For The Cone Zone
The following tips are to help you stay safe while traveling through maintenance and construction work zones.
- Do not speed in work zones. Obey the posted speed limits.
- Stay Alert! Expect the unexpected.
- Watch for workers. Drive with caution.
- Don't change lanes unnecessarily.
- Avoid using mobile devices such as phones while driving in work zones.
- Turn on headlights so that workers and other drivers can see you.
- Be especially alert at night while driving in work zones.
- Expect delays, especially during peak travel times.
- Allow ample space between you and the car in front of you.
- Anticipate lane shifts and merge when directed to do so.
- Be patient!
Download the COtrip App!
The new free COtrip Planner mobile app was designed to meet the growing trend of information on mobile and tablet devices for the traveling public. The COtrip Planner app provides statewide, real-time traffic information, and works on mobile devices that operate on the iOS and Android platforms. Visit the Google Play Store (Android devices) or the Apple Store (iOS devices) to download!