Military Access, Mobility & Safety Improvement Project Lane Closures Week of March 21
Travel Advisory
Colorado Springs — Colorado Department of Transportation and SEMA Construction are continuing work on improvements to I-25 between South Academy Boulevard and Santa Fe Avenue (Mile Points 135-127). Current work includes the widening the Clover and Dry Wash Bridges, constructing substructure for the I-25 bridges over South Academy, and hauling dirt and building up the embankment for the I-25 roadway. Currently there are no planned lane reductions expected for the week.
The traveling public will continue to see earthwork taking place in the median embankments; however, no lane closures are needed for the embankment operations.
On the bridges over South Academy, crews will be forming and installing rebar for the columns in the median of South Academy.
There will be increased construction at the Dry Wash and Clover Ditch bridges as crews work on forming and pouring concrete for the new footers, abutments and piers. With the variable nature of construction related I-25 lane closures, please eliminate distractions and drive the posted speed limit to safely arrive at your destination.
Flagging operations will continue on Charter Oak Ranch Road with intermittent shoulder closures Monday through Friday, from 7 a.m. to 7 p.m., allowing crews to safely continue work on the drainage system and dirt work. Please use extra caution when driving through the work zone.
Construction schedules are weather-dependent and subject to change.
Motorists are encouraged to register for text alerts by Texting MAMSIP to 888-970-9665
A Courtesy Patrol will be driving the work zone and will respond to incidents when notified. Hours of operation are 7 a.m. to 6 p.m., Monday through Friday and holidays.
Traffic Impacts
Santa Fe Avenue and Charter Oak Ranch Road
Flagging operations with intermittent shoulder closures continue on Charter Oak Ranch Road and Santa Fe Avenue Mon., March 21 to Sat., March 26, from 7 a.m. to 7 p.m. Closures are necessary to allow trucks access to and from the job site and to allow crews to work on the drainage system.
Project Overview
Interstate-25 – Safety and efficiency improvements
- The improvements to I-25 addressed in this project are located along an approximately 7.5-mile segment of the corridor beginning at South Academy Boulevard and extending to the Santa Fe Avenue (CO 85/87) exit at Fountain (MP 128), which exits to Gate 19 of Fort Carson.
- Replacement of two bridges crossing over South Academy Boulevard;
- Widening of both inside and outside shoulders and installing safety improvements;
- Concrete surface treatment overlay to provide an improved riding surface for this 7.5-mile segment;
- Installation of median barrier the entire length of this corridor;
- Rehab and widening work on four bridges along the corridor, and
- Installation of I-25 Southbound deceleration lane at the interchange with Colorado Highway 16.
Safety Benefits
The safety enhancements relate to the potential to reduce crashes, improve infrastructure, and address physical deficiencies that contribute to crashes in the corridor. CDOT conducted a safety assessment for the corridor to evaluate the magnitude and nature of safety problems and analyze the causes of crashes.
The proposed transportation improvements are mitigation measures to reduce crashes and improve safety in the corridor. It is estimated that the delivery of the MAMSIP project will, over its’ twenty years of operation, result in fewer deaths, injuries, and crashes on the four corridors the project addresses.
Project Information
For additional information about this project:
- Register for Alerts: Text MAMSIP to 888-970-9665
- Call the project information line at 719-800-2162
- Email the project team at: [email protected]
- Visit the project website at: https://www.codot.gov/projects/militaryaccesssafetyimprovements
Know Before You Go
Travelers are urged to “know before you go.” Gather information about weather forecasts, anticipated travel impacts, and current road conditions prior to hitting the road. CDOT resources include:
- Road conditions and travel information: COtrip.org
- Download the FREE COtrip Planner app: bit.ly/3DYCDOH
- Sign up for project or travel alerts: bit.ly/COalerts
- See scheduled construction lane closures: bit.ly/3n9ZAI1
- Connect with @ColoradoDOT on social media: Twitter, Facebook, Instagram and YouTube.
Remember: Slow For The Cone Zone
The following tips are to help you stay safe while traveling through maintenance and construction work zones.
- Do not speed in work zones. Obey the posted speed limits.
- Stay Alert! Expect the unexpected.
- Watch for workers. Drive with caution.
- Don't change lanes unnecessarily.
- Avoid using mobile devices such as phones while driving in work zones.
- Turn on headlights so that workers and other drivers can see you.
- Be especially alert at night while driving in work zones.
- Expect delays, especially during peak travel times.
- Allow ample space between you and the car in front of you.
- Anticipate lane shifts and merge when directed to do so.
- Be patient!
Download the COtrip App!
The new FREE COtrip Planner mobile app was designed to meet the growing trend of information on mobile and tablet devices for the traveling public. The COtrip Planner app provides statewide, real-time traffic information, and works on mobile devices that operate on the iOS and Android platforms. Visit the Google Play Store (Android devices) or the Apple Store (iOS devices) to download!