Nighttime on and off ramp closures I-25 at US 50B

June 13, 2018 - Southeastern Colorado/CDOT Region 2

Southeastern Colorado / CDOT Region 2 – PUEBLO – Rehabilitation of the bridge on Interstate 25 at US 50 B (Belmont Interchange) will require the following:

Thursday June 14th  

  • Westbound US 50B southbound on-ramp to I-25 to be closed from 8:00 pm Thursday June 14th evening to 5:00 am the following morning.  Traffic will be detoured onto the northbound on-ramp to I-25 to the 29th Street exit where motorists can then go southbound on I-25.  

  • The southbound, exit 100A off-ramp will be closed from 8:00 pm Thursday June 14th evening to 5:00 am the following morning.  Traffic will be detoured to the 13th street interchange during the closure.

  • Speeds will be reduced to 45 MPH through the work zone.

This work is part of the $10 million, CO 96 (4th Street) improvement project which includes intersection renovation, signal replacement, resurfacing and bridge rehabilitation. Work began in July of 2017 and will improve surface quality, enhance safety and provide improved pedestrian crossings, including upgrading ADA ramps to current standards. The project is scheduled to be complete by June of 2018.

All Media Personnel: The CO 96 project is an active construction area. Access on the project site is restricted unless accompanied by a Colorado Department of Transportation (CDOT) representative. Your safety is important to us, so please coordinate access requests in advance with Michelle Peulen. A safe area for interviews, b-roll, etc., and a project team member will be designated for escort and will coordinate the appropriate Personal Protective Equipment. We appreciate your cooperation. 

For information regarding CDOT projects statewide, log on to www.cotrip.org, call 511 from anywhere in the state. Information about weekly lane closures will be available at www.coloradodot.info/travel/scheduled-lane-closures.html.  

For project details, please call the project hotline (719) 391-5755.