Northern Avenue Bridge reduced to single lane with flagger July 20
A flagger will be in place to alternate eastbound and westbound traffic flow through the single lane. This temporary lane reduction is required to pour concrete on the Northern Avenue bridge.
Slight traffic delays are expected, speeds will be reduced to 25 MPH, and motorists are urged to use extra caution while traveling in the new traffic pattern.
PROJECT INFORMATION: The I-25 Ilex Street to City Center Drive project is the first project of the New Pueblo Freeway: the reconstruction of I-25 between City Center Drive (1st Street) and Ilex Street through downtown Pueblo. Construction includes upgrading several bridges south of downtown. The project began in July 2015, and is expected to be completed in 2018.
For updated project information, visit https://www.codot.gov/projects/ilexbridges or call 719-470-2270. To be added to the database for receiving project updates by e-newsletter, send an email to: [email protected].
- To receive real-time updates about road conditions in your area, visit www.cotrip.org or call 511 from anywhere in the state
- Information about weekly lane closures is available at https://www.codot.gov/travel/scheduled-lane-closures.html
- For information regarding CDOT projects statewide, log on to www.codot.gov
Updates are also available via Twitter @coloradodot and be sure to “Like” our Facebook page at www.facebook.com/coloradodot.
# # #