Full closure of US 6 for tunnel inspections
A full closure will be in place so crews can safely conduct tunnel inspections along this stretch of US 6. Inspections are necessary to report on the integrity and structure of each tunnel.
The remaining tunnels will be inspected on Wednesday, May 3 from 8 p.m. to 4 a.m. during the full closure of US 6 for the Jefferson and Clear Creek Counties Peaks to Plains Trail project.
Variable message boards will be utilized and traffic control signs alerting motorists of upcoming closures will be in place.
To sign up for “CDOT Alerts” on projects in your chosen area, visit CDOT’s website at www.codot.gov and choose the envelope icon at the bottom of the page. Or, to see CDOT’s lane closure reports for projects statewide, visit www.codot.gov/travel/scheduled-lane-closures.html. Major CDOT project updates are also available via CoTrip.org, Twitter @coloradodot or Facebook.