Helicopter Operations Scheduled for Gazex Maintenance on US 6 Loveland Pass Tomorrow
As part of the operation, a helicopter will be used to transport supplies to the Gazex shelter at Loveland ski area. The mission is scheduled to begin at daylight and last into the early afternoon.
CDOT will provide an escort for vehicles transporting hazardous materials through the Eisenhower Tunnel at the top of the hour. Vehicles may wait for processing through the tunnel at the staging areas at the approaches to the tunnel (EB MP 213, WB MP 215).
SIGN UP FOR CDOT ALERTS: Updates can be found on CDOT’s traveler information site at www.cotrip.org and recorded on the 511 phone line. If you are interested in receiving CDOT project and/or lane closure notifications to your email or mobile device, please sign up at www.codot.gov and choose the envelope icon at the bottom of the page.