Irrigation pipe demolition on SH 50 is postponed
MONTROSE COUNTY- A full closure of SH 50 at mile marker 107.3 is postponed until further notice. A sub-contractor did not meet OSHA requirements as specified in the scope of the project.
The demolition will be rescheduled once the safety specifications are met. The removal of the irrigation pipe will allow CDOT the ability to add highway lane width and shoulders, without the guardrail system, therefore creating a safer roadway for the traveling public. This project will also include a 60 inch siphon system that will allow for the removal of the overhead structure and removes the US 50 height restrictions.
To receive real-time updates about state highway road conditions in your area, visit www.coloradodot.info and click on the green cell phone icon in the upper right hand corner of the page. Live road conditions are available at www.cotrip.org, by downloading the CDOT Mobile app or by calling 511 from anywhere in the state. Updates are also available via Twitter @coloradodot and be sure to “Like” our Facebook page at www.facebook.com/coloradodot