CDOT Region 5 Maintenance Activity Update: October 18-25
Motorists are advised to slow down and drive with extra caution whenever work vehicles or flashing lights are seen. Thank you for driving “Slow for the Cone Zone!”
Be Informed and Stay Connected: The best way to stay up-to-date on project progress, traffic impacts and more is to sign up for email and wireless (text) alerts. Go to CDOT's web site at www.coloradodot.info and click on the green cell phone icon in the upper right hand corner of the page. Enter your information and choose the section of the state you would like to receive information about. Or, go to www.coloradodot.info or call 511 from anywhere in the state.
Area: Rico North and South
Location: SH 145, Mile Point (MP) 32 to 60 (Rico is at MP 47)
Duration: 10/20 through 10/24, 10 p.m. to 5:00 a.m., some day work possible Monday through Friday
Description: Shoulder work, mostly done at night; if day work underway, some brief lane closures could be in effect.
Area: Dolores North, North of Dove Creek
Location: SH 145, Mile Point (MP) 20 to 32; SH 141 MP 22-28.5
Duration: 10/20 through 10/24, 8 a.m. to 4:00 p.m.
Description: Roadside mowing, some brief lane closures could be in effect.
Area: North of Dove Creek
Location: SH 141 MP 19-24, spot locations
Duration: 10/20 through 10/24, 8 a.m. to 4:00 p.m. and some day work possible Monday through Friday
Description: Ditch cleaning, shoulder restoration; some brief lane closures could be in effect.
Area: South of Durango
Location: SH 172 MP 18-20
Duration: 10/20 through 10/24, 8 a.m. to 4:00 p.m.
Description: Ditch cleaning; some brief lane closures could be in effect.
Area: Red Mountain Pass
Location: US 550 MP 81
Duration: 10/21 through 10/22, 8 a.m. to 4:00 p.m.
Description: Slope stabilization/repairs to water erosion; expect single-lane, alternating traffic and up to 15-minute full traffic stops.
Area: North of Ridgway
Location: US 550 MP 105.5 to 108
Duration: 10/20 through 10/24, 9 a.m. to 3:30 p.m.
Description: Highway crack sealing; expect single-lane, alternating traffic and delays of 15-minutes maximum.
Area: Buena Vista
Location: US 285, Mile Point (MP) 138.5 to 140.5 at Chaffee County Road 270
Duration: 10/3 through 10/30, 8 a.m. to 4:30 p.m., Monday through Friday
Description: Resurfacing; speed limit reduced to 40 mph, single-lane, alternating traffic with delays.
Area: North of Antonito
Location: US 285, Mile Point (MP) 7.55 to 7.80
Duration: 10/20 through 10/24, 8 a.m. to 4:30 p.m., Monday through Friday
Description: Bridge work; speed limit reduced and some single-lane, alternating traffic, minor delay.
*CDOT’s Region 5 includes the counties of Montezuma, Dolores, San Miguel, southern Montrose, Ouray, San Juan, La Plata, Archuleta, Mineral, Chaffee, Saguache, Rio Grande, Conejos, Alamosa and Costilla. There are two Maintenance Sections (headquartered in Durango and Alamosa), six Maintenance Areas (with offices in Durango, Ridgway, Cortez, Alamosa, Monte Vista and Salida) and numerous Maintenance Patrols within those Areas. Each Maintenance Section also has a “Special Crews” division for Section-wide support work, including avalanche control, facilities maintenance, culvert work and more.