Spring Storm Hitting the Passes: Expect Icy Drive Tonight, Tomorrow
Saturday brings a return to mostly sunny skies, according to forecasters with the Colorado Avalanche Information Center (CAIC) and then “bluebird skies and much warmer temperatures” on Sunday. The CAIC predicts the next storm system will arrive Tuesday with colder temperatures and snow favoring the northern mountains.
For CDOT’s Region 5* this means four to eight inches of snow for most mountain areas and up to a foot of snow possible on north Red Mountain Pass. The Sangre de Cristo zone could also receive heavy snow overnight.
CDOT crews are already on storm-patrol shifts, meaning at least half of each patrol’s crews are out at a time, on eight- or 12-hour shifts, until dry road conditions are reached (please see information on patrol locations and crew numbers in your area, below). Winter driving conditions can be expected on the following passes: US 160 Wolf Creek Pass, US 160 La Veta Pass, SH 17 Cumbres/La Manga passes, US, US 550 Coal Bank, Molas and Red Mountain passes and SH 145 Lizard Head Pass. Motorists are urged to check conditions on www.cotrip.org and also check “DEVICES” for a map of roadway camera locations in key areas.
*CDOT Region 5 consists of the counties of: Alamosa, Archuleta, Chaffee, Conejos, Costilla, Dolores, La Plata, Mineral, Montezuma, Montrose (southern half), Ouray, Rio Grande, Saguache, San Juan and San Miguel.
PLAN YOUR TRIP - To receive real-time updates about road conditions in your area, visit www.coloradodot.info and click on the green cell phone icon in the upper right hand corner of the page. Information about weekly lane closures will be available at www.coloradodot.info/travel/scheduled-lane-closures.html. Live road conditions are available at www.cotrip.org, by downloading the CDOT Mobile app or by calling 511 from anywhere in the state. Updates are also available via Twitter @coloradodot and be sure to “Like” our Facebook page at www.facebook.com/coloradodot.
CDOT REGION 5 MAINTENANCE SECTIONS/AREAS/PATROLS
CDOT MAINTENANCE SECTION 3, DURANGO
The entire Durango Maintenance Section (also see individual maintenance areas, below) has 106 maintenance workers and 107 pieces of snow removal and avalanche control equipment. Thirteen trucks are equipped with liquid deicer applicator tanks. Other plow trucks will carry sand/salt for providing traction or, at optimum temperatures, sand pre-wetted with liquid deicer for traction and effective ice-melting. Durango maintenance crews take care of 1,750 lane-miles (the combined lengths of each lane on every highway in the section), including five mountain passes. During last winter (2012-2013), Durango maintenance crews plowed 383,393 total lane-miles. Crews spread 1,165,274 gallons of liquid deicers. They also spread 23,557 tons of sand/salt and spent 1,640 hours on avalanche control missions. Total dollars spent last winter (2012-13): $4,359,253.93. (This year’s 2013-14 budget is: $5,750,409.)
NOTE: Each Maintenance Area detailed below has special crews that additional work and/or avalanche control missions (in coordination with the Colorado Avalanche Information Center) on four mountain passes: US 550 Coal Bank, Molas and Red Mountain passes and SH 145 Lizard Head Pass (US 160 Wolf Creek Pass is maintained by Alamosa crews). Crews from both Maintenance Sections—Durango and Alamosa—assist one another with man-power and equipment during storms, as necessary.
Durango Maintenance Area
The Durango Maintenance Area has 6 patrols, located in: Pagosa Springs (4 plows), Bayfield (3 plows), Ignacio (3 plows), Durango (4 plows), Hesperus (4 plows) and Rockwood (3 plows). The Durango Maintenance Area has 43 maintenance workers and 35 pieces of snow removal and avalanche equipment (including 21 snowplows, 12 of which are equipped with *MDSS). Eleven trucks are equipped with liquid deicer applicator tanks. Other plow trucks carry sand/salt and for providing traction. Durango maintenance crews take care of 510.36 lane-miles. During last winter, Durango maintenance crews plowed 137,701 total lane-miles. As well, crews sprayed 626,898 gallons of liquid deicer, spread 6,938 tons of sand/salt and spent 237 hours on avalanche control missions. Total 2014 Winter Budget (for this current season): $1,559,488.
Cortez Maintenance Area
The Cortez Maintenance Area includes patrols in: Dove Creek (3 plows), Cortez (5 plows), Mancos (4 plows), Dolores (3 plows), Rico (4 plows) and Telluride (3 plows). The Cortez Area has 27 maintenance workers and 37 pieces of snow removal and avalanche equipment (including 22 snowplows, 6 of which are equipped with *MDSS). Cortez maintenance crews take care of 650.8 lane-miles. During last winter, Cortez maintenance crews plowed 129,942 total lane-miles. As well, crews sprayed 301,252 gallons of liquid deicer; spread 6,341 tons of sand/salt, and spent 103 hours on avalanche control missions. Total 2014 Budget (for this current season): $1,126,773.
Ridgway Maintenance Area
The Ridgway Maintenance Area includes patrols in: Cascade (3 plows), Silverton (3 plows), Ouray (3 plows), Ridgway (4 plows), Norwood (2 plows), Nucla (3 plows) and Paradox (1 plow). The Area has 33 maintenance workers and 35 pieces of snow and avalanche removal equipment (including 19 snowplows, 2 of which are equipped with *MDSS). One truck is equipped with a liquid deicer applicator tank. Other plow trucks carry sand/salt for providing traction. Ridgway maintenance crews take care of 588.84 lane-miles. During last winter, Ridgway maintenance crews plowed 115,750 total lane-miles. Crews sprayed 237,124 gallons of liquid deicer, spread 10,278 tons of sand/salt and spent 1,299 hours on avalanche control missions. Total 2014 Budget (for this current season): $1,585,194.
CDOT MAINTENANCE SECTION 7 – ALAMOSA
CDOT’s Alamosa Maintenance Section covers all of South-Central Colorado, including the counties of Alamosa, Archuleta, Chaffee, Conejos, Costilla, Fremont, Gunnison, Rio Grande, Saguache, Huerfano and east Mineral. The Alamosa Maintenance Section has some 113 maintenance workers and about 117 pieces of snow removal and avalanche equipment (including 64 snowplows, 9 of which are equipped with *MDSS). Nine trucks are equipped with liquid deicer applicator tanks. Other plow trucks will carry sand/salt and ice slicer (a solid salt product) for providing traction and de-icing. Alamosa maintenance crews take care of 1,727 lane-miles (the combined lengths of each lane on every highway in the section), including eight mountain passes. Total 2014 Budget for the Alamosa Section: $3,010,628.00.
Operations for the Alamosa Maintenance Section are divided into three Maintenance Areas, each with numerous patrol crews within. Here are the details:
North Area
The North Maintenance Area includes patrols in: Poncha Springs (8 plows), Maysville (6 plows), Sargents (3 plows) and Buena Vista (5 plows). Work in the North Area includes three passes: US 285 Poncha Pass, US 24 Trout Creek Pass and US 50 Monarch Pass. The Area has 31 maintenance workers including temporary employees and 26 pieces of snow and avalanche removal equipment (including 20 snowplows, 9 of which are equipped with MDSS). There are two trucks equipped with liquid deicer applicator tanks and seven combo units (that also carry sand/salt). Other plow trucks will carry sand/salt and ice slicer (a solid salt product) for providing traction. North Area maintenance crews take care of 400 lane-miles including the three mountain passes mentioned above. Total 2014 Winter Budget: $873,000.
West Area
The West Maintenance Area has patrols in: Monte Vista (3 plows), South Fork (8 plows), Saguache (5 plows), Pagosa Springs (3 plows) and Creede (2 plows). Work out of this Maintenance Area includes US 160 Wolf Creek Pass and SH 114 Cochatopa/North Pass. The Area has 34 maintenance workers including temporary employees and 38 pieces of snow and avalanche removal equipment (including 19 snowplows, 4 of which are equipped with MDSS). Four trucks are equipped with liquid deicer applicator tanks. Other plow trucks will carry sand/salt and ice slicer (a solid salt product) for providing traction. West area maintenance crews take care of 550 lane-miles including two mountain passes. Total 2014 Winter Budget: $1,144,200.00
East Area
The East Maintenance Area includes patrols in: Fort Garland (2 plows), US 160 La Veta Pass (3 plows), Alamosa (8 plows), Antonito (3 plows) and SH 17 La Manga Pass (4 plows; and work out of this patrol also includes SH 17 Cumbres Pass). The Area has 31 maintenance workers including temporary employees and 32 pieces of snow and avalanche removal equipment (including 20 snowplows, 10 of which are equipped with MDSS). Five trucks are equipped with liquid deicer applicator tanks. Other plow trucks will carry sand and ice slicer for providing traction. East Area maintenance crews take care of 608 lane-miles including three mountain passes. Total 2014 Winter Budget: $993,428.