Paving on State Highway 9 Tomorrow
Approximately ½ mile is being resurfaced, just south of Farmers Corner, near the Agape Outpost. Operations begin at 6:30 a.m. and continue until 5 p.m. Initially, traffic shifts will be employed through the work zone to maintain traffic flow. However, if conditions require traffic stops, flaggers will alternate northbound and southbound traffic, with stops up to 10 minutes.
The road is being resurfaced with 1 ½ inches of asphalt, preventing additional surface deterioration and helping to preserve the road base.
Lane closure information about this and other projects is available at www.coloradodot.info/travel/scheduled-lane-closures.html or by calling 511. To receive project updates via e-mail, visit www.coloradodot.info and click on the cell-phone icon in the upper right-hand corner. The link takes you to a list of items you can subscribe to, including Southwest Colorado.