CDOT Maintenance Work on US 40 Next Week
July 13, 2011 - Northwestern Colorado/CDOT Region 3 - Highway Resurfacing in Two Locations.
Time and Dates: 7:00 AM to 4:00 PM, July 18 – July 19, 2011
Locations: US 40 MM 208-211 (between Hot Sulphur Springs and Granby) and Highway 34 MM 11-13 (west of Grand Lake)
Speed Reduction: 40 mph through the work zone
Traffic Impacts: Pilot car with single-lane, alternating traffic and delays of up to 15 minutes (depending upon traffic volumes)
Thanks for going Slow for the Cone Zone!