Surface Improvement Project on Highway 24, west of Lake George
On Monday, June 20, and Tuesday, June 21, from 6:30 a.m. to 5 p.m., pilot cars will be alternating traffic at various locations of U.S. 24, beginning just east of the Wilkerson Pass summit and continuing east three miles. Delays up to 10 minutes should be expected. All work is weather permitting.
Due to the uneven road surface in between work days, the speed limit will be reduced to 40 mph during off-hours (Monday night/Tuesday morning).
The road is being resurfaced with 1 ½ inches of asphalt, preventing surface deterioration and helping to preserve the road base.
Updated information regarding traffic impacts on this or other CDOT projects is available at www.coloradodot.info/travel/scheduled-lane-closures.html or by calling 511. To receive project updates via e-mail, visit www.coloradodot.info and click on the cell-phone icon in the upper right-hand corner. The link takes you to a list of items you can subscribe to, including Southwest Colorado.