Fiber Optic Project Underway Next Week
Work consists of placing conduit and installing fiber optic line and pull boxes in the median and along the shoulder of U.S. 85 between Interstate 25 in Fountain and Las Vegas Street at the south end of Colorado Springs. Work also includes inserting fiber optic cable into existing conduit along State Highway 16 between Syracuse Street and I-25, and foundation work for a future fiber optic connection facility.
Drivers can expect single lane and left turn lane closures at various locations from 8 a.m. to 5 p.m., Monday through Friday. Only minor delays are expected.
The $707,000 project, contracted to American Directional Boring of St. Louis, MO., is scheduled for completion in June 2011.
Traffic information about this or other CDOT projects is on the cotrip.org website, by calling 511 or via subscription e-mail. To subscribe, please visit www.coloradodot.info and click on the cell-phone icon in the upper right-hand corner. The link takes you to a list of items you can subscribe to, including Southeast Colorado (Everything East of I-25 and South of I-70).