CDOT to install signal back-up system US 160 & SH 3 intersection
This system will allow the signal to run for approximately two hours without utility power, and minimize the impact on traffic during a power outage.
The installation will be underway Sunday morning (November 21) from 7:30 AM through 11:00 AM. During the work, the signals will be off and flaggers will be controlling the intersection. The purpose for this work is to install a battery back-up system in the cabinet. This will allow the traffic signals to run without utility power for two hours.
Crews greatly appreciate motorists’ patience and safe driving during these brief traffic upgrades.
For information about other projects or road conditions statewide, the public may log on to www.coloradodot.info or call 511 from anywhere in the state. Thank you for going “Slow for the Cone Zone!”