Colorado Department of Transportation 13:46 Tuesday, March 18, 2008 1 2007 Cost Data PROJECTS BID FROM 01/01/07 THROUGH 12/31/07 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20070104 LAFARGE WEST, INC 5 $5,486,601.90 80.31 STA 109A-017 SH 109, S. OF LA JUNTA 2 P 20070104 UNITED COMPANIES OF MESA COUNTY 6 $4,343,762.30 98.00 HB 0063-021 US 6: RIFLE TO NEW CASTLE 3 L 20070104 UNITED COMPANIES OF MESA COUNTY ALL BIDS REJECTED - CDOT OPTION HB 0063-021 US 6: RIFLE TO NEW CASTLE 3 L 20070104 INTERMOUNTAIN SLURRY SEAL, INC. 3 $636,636.00 77.66 NH 0501-054 US 50 IN GUNNISON COUNTY 3 M 20070104 LAFARGE WEST, INC 5 $2,812,764.10 109.74 STA 0961-012 SH 96, OVERLAY IN PUEBLO 2 R 20070111 BRANNAN SAND AND GRAVEL, LLC 6 $2,396,540.80 81.37 NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 9 6 U 20070111 LAFARGE WEST, INC 6 $3,030,336.55 86.05 STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 2 R 20070111 FLATIRON CONSTRUCTORS, INC. 2 $1,561,305.75 98.92 BR 109A-018 SH 109 LA JUNTA, SH50, MANZIN 2 P 20070111 ELAM CONSTRUCTION, INC. LOW BID IS GREATER THAN 15% OVER ENG EST IM 0702-269 I 70 IN EAGLE COUNTY 3 20070111 ELAM CONSTRUCTION, INC. 2 $6,097,048.50 103.13 IM 0702-269 I 70 IN EAGLE COUNTY 3 M 20070111 CONCRETE WORKS OF COLORADO INC. 3 $3,415,296.65 105.91 IM 0702-270 I 70 THROUGH GLENWOOD CANYON 3 M 20070118 AGGREGATE INDUSTRIES - WCR, INC. 5 $6,068,953.40 92.34 NH 0853-057 US 85 LASALLE TO 22ND ST 4 R 20070118 APC SOUTHERN CONSTRUCTION COMPANY, LLC 6 $2,587,537.90 87.74 STA 012A-042 SH 12, S. OF LA VETA 2 M 20070125 COULSON EXCAVATING COMPANY 3 $2,797,888.90 80.19 NH 0341-070 ON US 34 IN LARIMER COUNTY 4 L 20070125 A & S CONSTRUCTION CO. & AFFILIATED CO. 4 $2,963,668.63 89.57 STA 069A-021 SH 69, W. OF WALSENBURG 2 M 20070125 AGGREGATE INDUSTRIES - WCR, INC. 3 $8,998,479.50 114.96 IM 0253-194 ON I-25 IN WELD COUNTY 4 R 20070125 W.L. CONTRACTORS, INC. 5 $466,133.00 111.14 SHE 0931-027 SH 93 @ SH 72 6 R Colorado Department of Transportation 13:46 Tuesday, March 18, 2008 2 2007 Cost Data PROJECTS BID FROM 01/01/07 THROUGH 12/31/07 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20070125 GECO/KIMSEY, LLC 3 $542,660.97 68.92 IM 0703-319 EJMT 24.9 KV SERVICE 1 M 20070201 DURAN EXCAVATING, INC. 10 $280,947.75 75.62 STA 0661-009 ON SH 66 IN WELD COUNTY 4 P 20070201 LAFARGE WEST, INC 6 $2,311,991.69 87.66 STA 0361-082 US 36 IN BOULDER COUNTY 4 R 20070201 AGGREGATE INDUSTRIES - WCR, INC. 1 $2,364,652.48 86.41 NH 0342-044 ON US 34 IN WELD COUNTY 4 R 20070201 LAFARGE WEST, INC 5 $2,697,045.45 98.33 STA 086A-045 SH 86 - FRANKTOWN TO ELBERT CO 1 R 20070208 ASPHALT PAVING CO. 6 $1,780,011.01 118.64 NH 0062-023 SH 6, CLEAR CREEK CANYON 1 M 20070208 SOUTHWEST ASPHALT PAVING 6 $4,354,792.70 77.47 STA 1251-005 SH 125 AND 127 NORTH OF COWDRE 3 M 20070208 CONNELL RESOURCES, INC. 2 $3,238,445.00 95.63 NH 0402-070 US 40 ROUTT COUNTY 3 M 20070208 W.L.H. CONSTRUCTION COMPANY 3 $376,572.00 117.74 HB 149A-023 SOUTH FORK TO CREEDE - SHOULDE 5 M 20070215 STURGEON ELECTRIC COMPANY, INC 2 $447,496.10 95.99 NH 1602-102 WITHIN THE ALAMOSA CITY LIMITS 5 R 20070215 ASPHALT PAVING CO. 7 $1,433,882.92 81.70 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 6 U 20070215 ASPHALT PAVING CO. < 3 BIDDERS & LOW BID > 10% OVER ENG EST IM 0702-262 I-70, FRISCO TO EJM TUNNEL 1 M 20070215 ROCKY MOUNTAIN ENTERPRISES, INC. 6 $317,825.19 82.04 SHE 1151-020 SH 115 VMS, MP 17 AND MP 41 2 R 20070222 CASTLE ROCK CONST. CO. OF COLO, LLC 3 $8,008,939.59 98.43 NH 1602-099 U.S. 160 THROUGH ALAMOSA 5 R 20070222 ROCKY MOUNTAIN ENTERPRISES, INC. 6 $205,527.22 91.20 SHE 5502-054 5 M 20070308 CONCRETE CONSTRUCTION SPECIALTIES, LLC 8 $822,965.08 82.74 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERSE 6 L 20070308 LAFARGE WEST, INC 6 $8,628,074.05 85.49 STA 089A-011 SH 89, LYCAN TO HOLLY 2 P Colorado Department of Transportation 13:46 Tuesday, March 18, 2008 3 2007 Cost Data PROJECTS BID FROM 01/01/07 THROUGH 12/31/07 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20070308 SCOTT CONTRACTING INC. 6 $153,748.96 101.40 SHE 1151-018 SH 115 - GUMAER AVENUE EAST 2 U 20070308 UNITED COMPANIES OF MESA COUNTY 6 $2,969,611.95 89.40 HB 065A-019 SH 65 THRU CEDAREDGE 3 M 20070308 SCOTT CONTRACTING INC. 10 $1,060,278.90 96.79 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 2 U 20070308 LAFARGE WEST, INC 4 $4,899,999.99 106.49 IM0252-388 I-25 LARKSPUR INTERCHANGE NORT 1 L 20070315 ASPHALT PAVING CO. 3 $5,359,129.22 97.62 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 1 M 20070322 TEZAK HEAVY EQUIPMENT CO., INC. 6 $399,752.79 100.95 SHE 0504-050 INTERSECTION OF SH 50B AND SH 2 R 20070322 ASPHALT PAVING CO. 6 $2,877,507.36 92.81 IM 0703-308 I 70; US 40 TO COLFAX 6 R 20070322 SOUTHWEST ASPHALT PAVING 5 $1,832,020.35 87.97 STA0091-030 SH 9 BETWEEN FAIRPLAY AND ALMA 1 M 20070322 INTERFACE COMMUNICATIONS, COMPANY 4 $321,392.59 75.17 STA402A-007 SH 402 & I-25 OFFRAMS AND E. F 4 R 20070405 CRUZ CONSTRUCTION, INC. 4 $381,523.50 97.51 SHE 165A-011 ALONG SH 165 N/O RYE 2 M 20070414 CONCRETE WORKS OF COLORADO INC. 1 $1,537,065.69 100.00 C 0702-272 I-70 HLT TRANSITION CEILING SL 3 M 20070419 SEMA CONSTRUCTION, INC. 7 $2,777,777.00 101.12 HB 0852-101 ON US 85, APPROX. 11 MILES SO 1 R 20070419 PREMIER PAVING, INC. 6 $1,063,566.55 92.36 NH 030A-025 SH30 (HAVANA)- PARKER TO FLORI 6 R 20070419 APC SOUTHERN CONSTRUCTION COMPANY, LLC 4 $4,276,918.45 101.04 NH 0501-055 WORK IN THE TOWN OF GUNNISON 3 U 20070426 SEMA CONSTRUCTION, INC. 4 $6,110,462.25 97.48 NH 0405-025 KIT CARSON BRIDGE 1 L 20070426 J-2 CONTRACTING COMPANY 4 $967,652.85 104.23 SHE 0253-193 ON I-25 & SH 392 IN LARIMER CO 4 R 20070426 ADARAND CONSTRUCTORS, INC. 5 $706,432.45 79.65 SHE 0251-175 ALONG I 25 NORTH OF THE CITY O 2 P Colorado Department of Transportation 13:46 Tuesday, March 18, 2008 4 2007 Cost Data PROJECTS BID FROM 01/01/07 THROUGH 12/31/07 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20070426 COLUMBINE HILLS CONCRETE, INC. 5 $1,063,692.61 114.85 STA 006A-039 US 6 SAFETY IMPROVEMENTS 1 M 20070426 KIRKLAND CONSTRUCTION, RLLP 3 $3,396,164.50 109.38 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 5 R 20070503 W.L. CONTRACTORS, INC. 1 $1,156,460.00 132.34 ITSSW00-378 VMS REPLACEMENT IN REGIONS 1,2 00 R 20070510 A-1 CHIPSEAL COMPANY 2 $497,454.00 98.95 STA0631-009 SH 63 IN WASHINGTON COUNTY 4 L 20070510 A-1 CHIPSEAL COMPANY 2 $457,689.68 105.99 STA0343-029 ON US 34 EAST OF YUMA IN YUMA 4 L 20070510 INTERMOUNTAIN SLURRY SEAL, INC. 2 $802,999.00 102.71 STA0712-015 SH 71: NEBRASKA STATE LINE SOU 4 L 20070517 FLATIRON CONSTRUCTORS, INC. 6 $3,809,936.40 85.26 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 1 P 20070517 IDEAL FENCING CORPORATION 5 $528,135.17 89.44 SHE0761-193 I-76: SHERIDAN TO I-25 (M.P. 1 6 R 20070517 ROCKY MOUNTAIN ENTERPRISES, INC. 2 $410,977.75 164.50 CR600-285 VARIOUS LOCATIONS IN REGION 6. 6 U 20070517 W.L. CONTRACTORS, INC. 1 $432,723.50 103.48 STA 0703-312 I-70 HIDDEN VALLEY AND FALL RD 1 M 20070517 KIEWIT WESTERN CO 3 $1,746,301.50 137.59 IM0703-317 FROM MP 221.30 TO MP 251.30 JE 1 M 20070517 SCHMIDT CONSTRUCTION COMPANY 2 $2,713,890.85 92.14 STA0831-105 SH 83 NORTH OF EL PASO COUNTY 1 R 20070524 INTERSTATE HIGHWAY CONSTRUCTION 4 $48,658,183.42 90.57 IM 0253-164 ON I-25 IN WELD COUNTY 4 R 20070524 FLATIRON CONSTRUCTORS, INC. 7 $5,372,247.14 88.62 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTURE 6 R 20070524 K.E.C.I. COLORADO, INC. 2 $1,126,094.00 114.43 NH 0241-044 INTERSECTION OF US 285 & US 24 5 M 20070524 IDEAL FENCING CORPORATION 4 $642,889.56 126.11 SHE 133A-032 SH 133 BETWEEN REDSTONE AND MA 3 M 20070524 SIMON CONTRACTORS 3 $2,499,967.11 105.24 NH 3851-016 US 385 NORTH OF BURLINGTON 1 P Colorado Department of Transportation 13:46 Tuesday, March 18, 2008 5 2007 Cost Data PROJECTS BID FROM 01/01/07 THROUGH 12/31/07 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20070524 DKS ENTERPRISES INC. 2 $269,524.35 118.53 CR400-216 SIGNALS @ US34 & SH37, KERSEY 4 P 20070531 LAFARGE WEST, INC 6 $5,794,298.35 90.01 STA 0343-027 ON US 34 IN YUMA COUNTY 4 P 20070531 W.L. CONTRACTORS, INC. 2 $1,401,448.00 148.18 ITS SW00-457 DRCOG REGION 00 P 20070531 NEW DESIGN CONSTRUCTION CO. 4 $2,159,024.90 117.39 IM 0253-196 I-25: 48TH AVE TO US 36 225: 6 U 20070607 TLM CONSTRUCTORS, INC. 8 $423,042.00 118.47 BR 059A-032 ON SH 59 IN SEDGWICK COUNTY 4 P 20070614 W.L. CONTRACTORS, INC. 4 $734,582.00 110.65 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 A 6 U 20070614 UPPER PLAINS CONTRACTING, INC. 4 $9,593,034.30 90.87 IM0762-044 I-76 EAST OF SEDGWICK 4 R 20070614 MOUNTAIN CONSTRUCTORS, INC. 3 $743,656.50 98.50 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT CR 4 R 20070614 BRANNAN SAND AND GRAVEL, LLC 5 $6,112,092.41 97.02 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 25 1 M 20070614 COULSON EXCAVATING COMPANY 3 $2,835,979.40 104.64 NH0341-071 US 34: GARFIELD TO MORNING DRI 4 U 20070614 ASPHALT SPECIALTIES CO., INC. 2 $2,058,321.00 104.70 IR100-128 I-70 CHAIN STATION PROJECT 1 M 20070614 ASPHALT SPECIALTIES CO., INC. 2 $1,633,683.00 98.58 IR100-128 I-70 CHAIN STATION PROJECT 1 M 20070614 ASPHALT SPECIALTIES CO., INC. 2 $1,246,158.00 98.22 IR100-128 I-70 CHAIN STATION PROJECT 1 M 20070621 JALISCO INTERNATIONAL, INC. 3 $2,297,514.54 102.60 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH. 6 U 20070621 TEZAK HEAVY EQUIPMENT CO., INC. 7 $1,333,668.88 103.94 BR 114A-011 STRUCTURE J-09-G ON SH 114 NEA 3 M 20070621 STURGEON ELECTRIC COMPANY, INC 3 $1,185,458.90 116.80 ITSSW00-378 VMS REPLACEMENT IN REGIONS 1,2 00 R 20070628 HIGHWAY TECHNOLOGIES 3 $439,085.50 110.94 CR600-285 VARIOUS LOCATIONS IN REGION 6. 6 U Colorado Department of Transportation 13:46 Tuesday, March 18, 2008 6 2007 Cost Data PROJECTS BID FROM 01/01/07 THROUGH 12/31/07 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20070712 TEZAK HEAVY EQUIPMENT CO., INC. 8 $4,844,123.93 84.80 HPP 0241-045 SH 24 MP 169.0 TO 174.1 3 M 20070712 ARROW ELECTRIC SERVICE, INC. 1 $210,362.83 89.16 SHE 0504-054 AT THE INTERSECTION OF SH50C A 2 U 20070712 STRUCTURES, INC. 2 $565,038.40 99.26 BRR500-087 US 160 PAGOSA SPRINGS 5 U 20070726 SCOTT CONTRACTING INC. 5 $1,329,494.60 93.62 STA 094A-031 SH 94 AND CURTIS RD. 2 R 20070726 AMERICAN CIVIL CONSTRUCTORS, INC. 3 $1,758,303.00 90.97 C065A-020 SH65 GRAND MESA SLIDE REPAIR 3 M 20070802 SEMA CONSTRUCTION, INC. 2 $5,291,573.62 137.95 STA 133A-031 SH 133 IN GARFIELD COUNTY 3 M 20070802 ELECTROBRAID FENCE, INC 5 $1,795,394.00 79.36 SHE 0702-267 NEAR VAIL IN EAGLE COUNTY 3 M 20070809 AIS CONSTRUCTION COMPANY 2 $695,018.90 95.64 NH 5502-055 COALBANK PASS 5 M 20070809 STURGEON ELECTRIC COMPANY, INC 2 $521,239.95 79.03 ITS SW00-457 DRCOG REGION 00 P 20070809 BTE CONCRETE FORMWORK LLC 1 $2,753,004.00 67.19 C0702-273 I-70 GLENWOOD CANYON 3 M 20070816 JALISCO INTERNATIONAL, INC. 5 $3,648,394.17 86.25 BR 0253-192 I-25&128TH 6 U 20070816 UPPER PLAINS CONTRACTING, INC. 4 $7,911,503.50 88.15 CR100-126 WEST OF KIT CARSON 1 P 20070823 K.E.C.I. COLORADO, INC. 2 $579,742.00 118.03 NH 1601-056 US 160 @ ROOSA AVE 5 U 20070827 SEMA CONSTRUCTION, INC. 3 $319,349.00 100.00 C0701-190 26.5 ROAD/I-70 BRIDGE REPAIR 3 U 20070830 FLATIRON CONSTRUCTORS, INC. 4 $27,657,855.15 97.31 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 2 R 20070830 W.L. CONTRACTORS, INC. 2 $1,673,242.00 105.88 ITSSW00-455 VMS REPLACEMENT IN REGIONS 1,3 00 R 20070830 ROCK & COMPANY 4 $1,011,002.62 90.62 IM0703-323 GEORGETOWN HILL CHUTE 2 AND 3, 1 M Colorado Department of Transportation 13:46 Tuesday, March 18, 2008 7 2007 Cost Data PROJECTS BID FROM 01/01/07 THROUGH 12/31/07 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20070906 FLATIRON CONSTRUCTORS, INC. ALL BIDS REJECTED - CDOT OPTION CR 600-275-Steel Alt ELEVATED I-70 BETWEEN BRIGHTON 6 U CR600-275-Prestr Concr Alt ELEVATED I-70 BETWEEN BRIGHTON 6 U 20070906 DKS ENTERPRISES INC. 5 $436,128.40 78.24 IM R400-215 I-25 & I-76 VMS INSTALLATION 4 R 20070906 G.A. WESTERN CONSTRUCTION CO. 5 $657,969.25 88.57 C0701-187 I-70 20 ROAD BRIDGE REPAIR 3 R 20070906 BRANNAN SAND AND GRAVEL, LLC 4 $433,045.13 99.38 IM 0703-331 WB I-70 AT M.P. 259.70 AND M.P 6 R 20070907 LAWRENCE CONSTRUCTION CO. 3 $1,986,483.38 86.28 C 078A-007 SH 78, MILEPOST 13.2, OVER NOR 2 M 20070920 SEMA CONSTRUCTION, INC. 4 $4,644,444.44 85.71 STA 133A-031 SH 133 IN GARFIELD COUNTY 3 M 20070927 ABCO CONTRACTING, INC. 5 $964,291.80 91.08 C R600 - 300 VARIOUS LOCATIONS IN REGION 6 6 R 20071004 CONNELL RESOURCES, INC. 11 $575,581.00 87.10 C R400-217 SIGNALS @ SH66 & CR13 4 R 20071018 TRICON 2, LLC 4 $1,489,425.73 119.37 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 2 M 20071018 AMERICAN WEST CONSTRUCTION, LLC 3 $985,828.25 100.79 BR R300-130 I-70 (VARIOUS LOCATIONS) 3 M 20071018 IDEAL FENCING CORPORATION 5 $422,773.77 105.98 SHE0092-019 SH 9 NORTH OF SILVERTHORNE, IN 1 M 20071018 DKS ENTERPRISES INC. 4 $534,191.70 110.55 IM 0703-336 WB I-70 AT M.P. 259.70 AND M.P 6 R 20071025 CONCRETE EXPRESS, INC. 3 $37,771,000.00 144.02 BR2854-113 US285: KIPLING TO FEDERAL 6 R 20071025 ELAM CONSTRUCTION, INC. 4 $3,795,553.40 114.50 STA 340A-013 SH 340 IN FRUITA 3 U 20071025 AMERICAN CIVIL CONSTRUCTORS, INC. 2 $244,345.00 140.55 NH 160A-002 DOUBLE TREE BRIDGE ( O-05-AJ) 5 M 20071101 AMERICAN CIVIL CONSTRUCTORS, INC. 3 $670,854.00 121.02 C 0504-055 PUEBLO COUNTY, US-50C AT SALT 2 U 20071108 POWER ENGINEERS, INC. < 3 BIDDERS & LOW BID > 10% OVER ENG EST C 0702-274 FRISCO (MM 201) TO EAST VAIL ( 1 Colorado Department of Transportation 13:46 Tuesday, March 18, 2008 8 2007 Cost Data PROJECTS BID FROM 01/01/07 THROUGH 12/31/07 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20071108 POWER ENGINEERS, INC. < 3 BIDDERS & LOW BID > 10% OVER ENG EST C 0702-274 FRISCO (201) TO EAST VAIL (MM 1 20071108 POWER ENGINEERS, INC. < 3 BIDDERS & LOW BID > 10% OVER ENG EST C 0702-274 FRISCO (MM 201) TO EAST VAIL ( 1 20071115 PARKER EXCAVATING, INC. 8 $748,423.19 81.74 BR 0241-047 US 24, 2 MI S OF GRANITE, CHAF 5 M 20071115 ZAK DIRT, INC. 8 $4,997,321.45 103.32 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 1 M 20071129 EDWARD KRAEMER & SONS INC. 7 $2,926,771.59 92.85 BR1192-015 SH 119 IN WELD COUNTY NORTH OF 4 R 20071129 SEMA CONSTRUCTION, INC. 6 $2,558,916.20 112.27 BR0341-069 ON US 34 IN LARIMER COUNTY 4 M 20071129 INTERFACE COMMUNICATIONS, COMPANY 4 $227,108.79 102.87 SHE 082A-010 SH 82 AND BUFFALO VALLEY ROAD 3 U 20071129 KIEWIT WESTERN CO 4 $637,840.00 91.34 C120A-007 ON SH 120 AT PORTLAND OVER THE 2 R 20071205 ABCO CONTRACTING, INC. 3 $151,173.40 100.80 C0703-338 CLEAR CREEK COUNTY 1 M 20071206 INTERSTATE ELECTRICAL CONTRACTORS, INC. 3 $2,947,822.20 65.16 IM 0703-326 EISENHOWER JOHNSON MEMORIAL TU 1 M 20071206 STURGEON ELECTRIC COMPANY, INC 5 $696,740.75 109.58 STSR400-229 SH 14, SH 93, & SH 157 IN BOUL 4 U 20071213 HAMON CONTRACTORS, INC. 6 $4,844,120.65 105.07 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 6 R 20071220 EDWARD KRAEMER & SONS INC. ALL BIDS REJECTED - CDOT OPTION CR 600-275 I-70 VIADUCT - COLO. TO BRIGHT 6 U 20071220 ROCKY MOUNTAIN ENTERPRISES, INC. 4 $617,019.71 99.06 SHE 160A-009 U.S. 160 MP 94.15 - MP 96.63 5 M 20071220 CASTLE ROCK CONST. CO. OF COLO, LLC 6 $6,695,038.60 111.57 CC 0821-084 SH82 ASPEN 3 M ======= ================ ====== TOTALS 530 $390,970,855.60 98.24 Colorado Department of Transportation 13:46 Tuesday, March 18, 2008 1 2007 Cost Data BRIDGE COST PER SQUARE FOOT (01/01/07 THROUGH 12/31/07) ------------------------------------------------------------------------------------------------------------------------------------ PROJECT NUMBER/ TERR/ TOTAL TOTAL COST PER DATE LET PROJECT LOCATION BRIDGE ID LENGTH WIDTH SQUARE FT COST SQUARE FOOT ------------------------------------------------------------------------------------------------------------------------------------ BRIDGE REPAIR 070111 BR 109A-018 P SH 109 LA JUNTA, SH50, MANZIN M-22-AY 1448.0000 30.0000 43440.0 $445,946 $10.27 L-21-CX 173.0000 38.0000 6574.0 $445,941 $67.83 L-26-H 570.0000 28.0000 15960.0 $147,120 $9.22 070118 NH 0853-057 R US 85 LASALLE TO 22ND ST C-18-K 952.0000 33.5000 31892.0 $294,674 $9.24 070308 IM0252-388 L I-25 LARKSPUR INTERCHANGE NORT H-17-CQ 203.0000 120.0000 24360.0 $52,994 $2.18 H-17-AH 124.0000 104.1000 12908.4 $13,027 $1.01 H-17-CI 94.0000 38.0000 3572.0 $7,316 $2.05 070906 C0701-187 R I-70 20 ROAD BRIDGE REPAIR H-02-FF 296.0000 24.0000 7104.0 $627,519 $88.33 WEIGHTED AVERAGE COST: NEW STRUCTURES 145810.4 $2,034,536 $13.95 BRIDGE DECK REPLACEMENT 070111 IM 0702-270 M I 70 THROUGH GLENWOOD CANYON F-08-AB 429.5000 34.0000 14603.0 $277,460 $19.00 WEIGHTED AVERAGE COST: NEW STRUCTURES 14603.0 $277,460 $19.00 CONCRETE SLAB AND GIRDER 070201 NH 0342-044 R ON US 34 IN WELD COUNTY C-19-AH 104.0000 42.0000 4368.0 $41,653 $9.54 070315 IM 0702-262 M I-70, FRISCO TO EJM TUNNEL F-12-Q 74.0000 38.0000 2812.0 $3,771 $1.34 070517 STA0831-105 R SH 83 NORTH OF EL PASO COUNTY G-18-BC 115.0000 28.0000 3220.0 $75,947 $23.59 Colorado Department of Transportation 13:46 Tuesday, March 18, 2008 2 2007 Cost Data BRIDGE COST PER SQUARE FOOT (01/01/07 THROUGH 12/31/07) ------------------------------------------------------------------------------------------------------------------------------------ PROJECT NUMBER/ TERR/ TOTAL TOTAL COST PER DATE LET PROJECT LOCATION BRIDGE ID LENGTH WIDTH SQUARE FT COST SQUARE FOOT ------------------------------------------------------------------------------------------------------------------------------------ G-18-H 92.0000 28.0000 2576.0 $59,553 $23.12 070524 IM 0253-164 R ON I-25 IN WELD COUNTY D-17-ES 174.5000 64.0000 11168.0 $1,342,477 $120.21 D-17-ET 174.5000 64.0000 11168.0 $804,051 $72.00 070827 C0701-190 U 26.5 ROAD/I-70 BRIDGE REPAIR H-02-EM 205.0000 24.0000 4920.0 $295,529 $60.07 071205 C0703-338 M CLEAR CREEK COUNTY F-13-J 144.0000 42.0000 6048.0 $151,173 $25.00 WEIGHTED AVERAGE COST: NEW STRUCTURES 46280.0 $2,774,155 $59.94 PRECAST SEGMENTAL BOX GIRDER 070524 IM 0253-164 R ON I-25 IN WELD COUNTY D-17-EP 348.0000 123.0000 42804.0 $4,199,199 $98.10 WEIGHTED AVERAGE COST: NEW STRUCTURES 42804.0 $4,199,199 $98.10 PRESTRES GIRDER (BOX SECTION) 070517 BR 0711-014 P 1.0 MILE N. OF PUNKIN CENTER I-22-F 265.0000 39.0000 10335.0 $889,595 $86.08 WEIGHTED AVERAGE COST: NEW STRUCTURES 10335.0 $889,595 $86.08 PRESTRES GIRDER (I-SECTION G-68) 070524 IM 0253-164 R ON I-25 IN WELD COUNTY D-17-EQ 360.9000 64.0000 23097.6 $1,990,460 $86.18 D-17-ER 360.9000 64.0000 23097.6 $1,758,924 $76.15 WEIGHTED AVERAGE COST: NEW STRUCTURES 46195.2 $3,749,384 $81.16 PRESTRES GIRDER (I-SECTION G-72) 070517 BR 0711-014 P 1.0 MILE N. OF PUNKIN CENTER I-22-D 293.0000 39.0000 11427.0 $930,227 $81.41 WEIGHTED AVERAGE COST: NEW STRUCTURES 11427.0 $930,227 $81.41 PRESTRES GIRDER (TT SECTION) 070816 BR 0253-192 U I-25&128TH E-17-ADM 270.5000 76.0000 20558.0 $1,928,116 $93.79 WEIGHTED AVERAGE COST: NEW STRUCTURES 20558.0 $1,928,116 $93.79 MAJOR STRUCTURE CBC OR PIPES 070607 BR 059A-032 P ON SH 59 IN SEDGWICK COUNTY A-26-AZ 22.0000 69.0000 1518.0 $188,818 $124.39 WEIGHTED AVERAGE COST: NEW STRUCTURES 1518.0 $188,818 $124.39 Colorado Department of Transportation 13:46 Tuesday, March 18, 2008 3 2007 Cost Data BRIDGE COST PER SQUARE FOOT (01/01/07 THROUGH 12/31/07) ------------------------------------------------------------------------------------------------------------------------------------ PROJECT NUMBER/ TERR/ TOTAL TOTAL COST PER DATE LET PROJECT LOCATION BRIDGE ID LENGTH WIDTH SQUARE FT COST SQUARE FOOT ------------------------------------------------------------------------------------------------------------------------------------ FABRICATED STEEL GIRDER 070315 IM 0702-262 M I-70, FRISCO TO EJM TUNNEL F-12-Y 554.0000 48.0000 26592.0 $61,531 $2.31 F-12-S 296.0000 42.0000 12432.0 $49,314 $3.97 WEIGHTED AVERAGE COST: NEW STRUCTURES 39024.0 $110,845 $2.84 RAILROAD BRIDGE 070426 NH 0405-025 P KIT CARSON BRIDGE I-25-A 304.0000 40.0000 12160.0 $1,987,187 $163.42 WEIGHTED AVERAGE COST: NEW STRUCTURES 12160.0 $1,987,187 $163.42 MISCELLANEOUS 070726 C065A-020 M SH65 GRAND MESA SLIDE REPAIR H-04-A 175.0000 35.0000 6125.0 $1,744,803 $284.87 WEIGHTED AVERAGE COST: NEW STRUCTURES 6125.0 $1,744,803 $284.87 Colorado Department of Transportation 13:46 Tuesday, March 18, 2008 1 2007 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/07 THROUGH 12/31/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 000-00030 Construction Engineering (Consultant) 1 Lump Sum 37,771,000.00 37,771,000.00 201-00000 Clearing and Grubbing 29 Lump Sum 1,179,666.16 40,678.14 201-00001 Clearing and Grubbing 15 Acre 233,855.45 15,590.36 202-00000 Removal of Structures and Obstructions 4 Lump Sum 94,564.00 23,641.00 202-00001 Removal of Structure 61 Each 75,150.16 1,231.97 202-00003 Removal of Structure (Special) 4 Lump Sum 491,679.17 122,919.79 202-00004 Removal of Steel H or Pipe Piling 321 Lin Foot 8,025.00 25.00 202-00008 Tree Trimming 106 Hour 30,962.80 292.10 202-00009 Tree Trimming 1 Lump Sum 400.00 400.00 202-00010 Removal of Tree 324 Each 101,186.06 312.30 202-00014 Brush Clearing 96 Hour 36,086.40 375.90 202-00015 Removal of Headwall 10 Each 15,500.00 1,550.00 202-00019 Removal of Inlet 104 Each 120,923.32 1,162.72 202-00020 Removal of Concrete Box Culvert 1 Each 76,094.57 76,094.57 202-00021 Removal of Manhole 1 Each 1,500.00 1,500.00 202-00023 Removal of Embankment Protector Type 3 5 Each 625.00 125.00 202-00025 Removal of Ditch Lining 2,974 Lin Foot 7,256.56 2.44 202-00026 Removal of Slope and Ditch Paving 131 Sq Yard 4,009.00 30.60 202-00027 Removal of Riprap 1,518 Sq Yard 9,761.22 6.43 202-00030 Removal of Water Service 1 Each 1,500.00 1,500.00 202-00033 Removal of Pipe 77 Each 83,085.00 1,079.03 202-00035 Removal of Pipe 14,426 Lin Foot 294,801.42 20.44 202-00037 Removal of End Section 78 Each 17,546.70 224.96 202-00038 Removal of Structural Plate Pipe 79 Lin Foot 10,497.52 132.88 202-00070 Removal of Barricade 2 Each 812.57 406.29 202-00080 Removal of Guard Post 6 Each 480.00 80.00 202-00090 Removal of Delineator 5,205 Each 28,368.90 5.45 202-00155 Removal of Wall 473 Lin Foot 9,173.85 19.40 202-00170 Grinding And Texturing Concrete Pavement 40 Sq Yard 3,400.00 85.00 202-00190 Removal of Concrete Median Cover Material 4,871 Sq Yard 72,611.40 14.91 202-00195 Removal of Median Cover 1,103 Sq Yard 13,219.70 11.99 202-00200 Removal of Sidewalk 14,303 Sq Yard 195,773.85 13.69 202-00201 Removal of Curb 8,582 Lin Foot 46,620.70 5.43 202-00202 Removal of Gutter 527 Lin Foot 8,248.00 15.65 202-00203 Removal of Curb and Gutter 60,027 Lin Foot 348,554.90 5.81 202-00204 Removal of Curb, Gutter and Sidewalk 735 Lin Foot 11,013.60 14.98 202-00206 Removal of Concrete Curb Ramp 1,287 Sq Yard 42,232.95 32.82 202-00210 Removal of Concrete Pavement 52,880 Sq Yard 703,087.55 13.30 Colorado Department of Transportation 13:46 Tuesday, March 18, 2008 2 2007 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/07 THROUGH 12/31/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 202-00215 Removal of Concrete Pavement (Planing) 2,361 Sq Yard 18,938.25 8.02 202-00220 Removal of Asphalt Mat 186,429 Sq Yard 1,210,721.26 6.49 202-00226 Removal of Asphalt Mat (Special) 267,806 Sq Yard 859,657.26 3.21 202-00240 Removal of Asphalt Mat (Planing) 2,143,749 Sq Yard 4,435,533.81 2.07 202-00246 Removal of Asphalt Mat (Planing) (Special) 21,119 Sq Yard 114,645.67 5.43 202-00250 Removal of Pavement Marking 211,513 Sq Foot 275,664.10 1.30 202-00400 Removal of Bridge 14 Each 1,456,074.22 104,005.30 202-00425 Removal of Bridge Railing 7,246 Lin Foot 61,280.55 8.46 202-00450 Removal of Portions of Present Structure (Class 1) 665 Sq Yard 25,001.90 37.60 202-00453 Removal of Portions of Present Structure (Class 2) 3,827 Sq Yard 421,479.35 110.13 202-00454 Removal of Portions of Present Structure (Class 2A) 9 Sq Yard 4,630.00 514.44 202-00460 Removal of Portions of Present Structure (Class 3) 396 Sq Yard 57,294.50 144.68 202-00462 Removal of Portions of Present Structure (Class 3A) 5 Sq Yard 2,941.50 588.30 202-00495 Removal of Portions of Present Structure 10 Lump Sum 375,025.87 37,502.59 202-00500 Removal of Portions of Present Structure 12 Each 56,931.00 4,744.25 202-00502 Removal of Portions of Present Structure 21 Cubic Yard 12,750.00 607.14 202-00503 Removal of Portions of Present Structure 2,644 Sq Yard 411,866.00 155.77 202-00504 Removal of Expansion Device 1,601 Lin Foot 109,568.95 68.44 202-00520 Removal of Expansion Joint Material 510 Lin Foot 23,970.00 47.00 202-00700 Removal of Light Standard 63 Each 31,501.00 500.02 202-00710 Removal of Power Pole 1 Each 572.13 572.13 202-00750 Removal of Luminaire 4 Each 1,712.00 428.00 202-00800 Removal of Overpass Mounted Sign Bracket 1 Each 1,315.00 1,315.00 202-00805 Removal of Overhead Sign Structure 13 Each 66,369.50 5,105.35 202-00810 Removal of Ground Sign 821 Each 114,536.76 139.51 202-00815 Removal of Sign (Special) 4 Each 12,929.00 3,232.25 202-00818 Removal of Steel Sign Ground Stub base (36 Inch) 1 Each 270.00 270.00 202-00821 Removal of Sign Panel 130 Each 3,967.10 30.52 202-00823 Removal of Dynamic Message Sign 4 Each 12,344.70 3,086.18 202-00825 Removal of Flashing Beacon 5 Each 1,580.00 316.00 202-00827 Removal of Pull Box 2 Each 104.00 52.00 202-00828 Removal of Traffic Signal Equipment 11 Lump Sum 62,717.46 5,701.59 202-00831 Removal of Traffic Signal Head 1 Each 60.00 60.00 202-00840 Removal of Traffic Signal Pole 27 Each 38,107.00 1,411.37 202-00848 Removal of Traffic Signal Controller and Cabinet 1 Each 300.00 300.00 202-00858 Removal of Pedestal Pole 1 Each 33.00 33.00 202-00895 Removal of Impact Attenuator 6 Each 11,440.00 1,906.67 202-00900 Removal of Concrete Footing 27 Each 10,507.94 389.18 Colorado Department of Transportation 13:46 Tuesday, March 18, 2008 3 2007 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/07 THROUGH 12/31/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 202-00950 Removal of Concrete Foundation and Slab 28 Sq Yard 1,443.75 51.56 202-01000 Removal of Fence 305,700 Lin Foot 227,303.46 0.74 202-01030 Removal of Road Closure Gate 1 Each 300.00 300.00 202-01130 Removal of Guardrail Type 3 75,113 Lin Foot 186,930.95 2.49 202-01140 Removal of Guardrail Type 4 17,211 Lin Foot 265,929.03 15.45 202-01170 Removal of Guardrail Type 7 480 Lin Foot 3,020.00 6.29 202-01200 Removal of Tensioned Cable Barrier 19,218 Lin Foot 30,748.80 1.60 202-01300 Removal of End Anchorage 187 Each 29,014.38 155.16 202-04001 Plug Culvert 10 Each 10,998.00 1,099.80 202-04002 Clean Culvert 74 Each 206,447.32 2,789.83 202-04005 Clean Valve Box 59 Each 8,355.00 141.61 202-04100 Abandon Well 1 Each 1,500.00 1,500.00 202-05006 Sawing Concrete (6 Inch) 112 Lin Foot 2,240.00 20.00 202-05010 Sawing Concrete (10 Inch) 135 Lin Foot 4,725.00 35.00 202-05026 Sawing Asphalt Material (6 Inch) 700 Lin Foot 1,610.00 2.30 202-05030 Sawing Asphalt Material (10 Inch) 3,492 Lin Foot 11,349.00 3.25 202-05100 Sandblasting Reinforcing Steel 173 Sq Yard 3,722.65 21.52 202-05150 Sandblasting 171,020 Sq Foot 86,175.50 0.50 202-06000 Removal of Detour 3 Lump Sum 88,016.80 29,338.93 202-06520 Removal of Existing Wall Panels 1 Lump Sum 180,000.00 180,000.00 202-07000 Obliterate Old Road 1 Lump Sum 140,000.00 140,000.00 203-00000 Unclassified Excavation 27,867 Cubic Yard 604,215.49 21.68 203-00010 Unclassified Excavation (Complete In Place) 673,157 Cubic Yard 3,816,153.54 5.67 203-00060 Embankment Material (Complete In Place) 585,682 Cubic Yard 5,108,764.25 8.72 203-00062 Embankment Material (Complete In Place) (Special) 258,872 Cubic Yard 1,870,212.25 7.22 203-00100 Muck Excavation 18,272 Cubic Yard 278,507.00 15.24 203-00210 Borrow (Complete In Place) 6,130 Cubic Yard 73,551.44 12.00 203-00400 Rock Excavation 7,653 Cubic Yard 333,631.43 43.59 203-00596 Rock Scaling 1 Lump Sum 25,000.00 25,000.00 203-00598 Rock Scaling 125 Hour 31,225.00 249.80 203-00840 Expanded Polystyrene Fill 68 Cubic Yard 30,600.00 450.00 203-01100 Proof Rolling 783 Hour 73,940.76 94.43 203-01140 Rolling 156 Hour 15,533.04 99.57 203-01200 Roadway Insulation Material (2 Inch) 51,370 Sq Foot 77,055.00 1.50 203-01500 Blading 3,714 Hour 430,561.70 115.93 203-01510 Backhoe 507 Hour 71,323.44 140.68 203-01515 Backhoe (Landscaping) 80 Hour 8,658.10 108.23 203-01550 Dozing 275 Hour 39,701.50 144.37 Colorado Department of Transportation 13:46 Tuesday, March 18, 2008 4 2007 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/07 THROUGH 12/31/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 203-01555 Dozing (Landscaping) 158 Hour 19,647.40 124.35 203-01582 Truck (Dump) 326 Hour 46,754.02 143.42 203-01590 Front End Loader (Rubber Tire) 236 Hour 30,265.08 128.24 203-01594 Combination Loader 749 Hour 86,749.40 115.82 203-01597 Potholing 2,438 Hour 470,975.62 193.18 203-01620 Sweeping 200 Hour 20,922.00 104.61 203-01622 Sweeping (With Pickup Broom) 439 Hour 63,915.00 145.59 203-02300 Rock Scaler 50 Hour 8,000.00 160.00 203-02330 Laborer 640 Hour 28,899.00 45.15 206-00000 Structure Excavation 70,993 Cubic Yard 1,230,387.68 17.33 206-00050 Structure Backfill (Special) 412 Cubic Yard 6,798.00 16.50 206-00065 Structure Backfill (Flow-Fill) 1,241 Cubic Yard 206,751.40 166.60 206-00066 Structure Backfill (Flowable Fly Ash) 74 Cubic Yard 10,120.00 136.76 206-00100 Structure Backfill (Class 1) 57,879 Cubic Yard 2,063,865.20 35.66 206-00200 Structure Backfill (Class 2) 9,653 Cubic Yard 179,407.80 18.59 206-00360 Mechanical Reinforcement of Soil 53,771 Cubic Yard 945,560.94 17.58 206-00510 Filter Material (Class A) 1,589 Cubic Yard 64,595.00 40.65 206-00520 Filter Material (Class B) 283 Cubic Yard 12,602.50 44.53 206-01000 Bed Course Material 185 Cubic Yard 4,554.70 24.62 206-01750 Shoring 6 Lump Sum 87,872.00 14,645.33 206-01781 Shoring (Area 1) 7 Lump Sum 183,498.45 26,214.06 206-01782 Shoring (Area 2) 6 Lump Sum 225,784.43 37,630.74 206-01783 Shoring (Area 3) 5 Lump Sum 301,232.83 60,246.57 206-01784 Shoring (Area 4) 3 Lump Sum 104,831.00 34,943.67 206-01785 Shoring (Area 5) 2 Lump Sum 112,635.51 56,317.76 206-01786 Shoring (Area 6) 1 Lump Sum 23,948.09 23,948.09 206-01787 Shoring (Area 7) 1 Lump Sum 23,948.09 23,948.09 207-00205 Topsoil 142,049 Cubic Yard 1,200,714.41 8.45 207-00210 Stockpile Topsoil 59,207 Cubic Yard 369,475.59 6.24 207-00305 Wetland Topsoil 1,518 Cubic Yard 17,739.37 11.69 207-00310 Stockpile Wetland Topsoil 555 Cubic Yard 7,785.00 14.03 207-00405 Topsoil (Special) 339 Cubic Yard 14,695.65 43.35 208-00002 Erosion Log (12 Inch) 73,135 Lin Foot 397,481.70 5.43 208-00003 Erosion Log (18 Inch) 21,318 Lin Foot 190,231.59 8.92 208-00004 Silt Berm 200 Lin Foot 1,820.00 9.10 208-00005 Erosion Log 45,693 Lin Foot 176,716.48 3.87 208-00007 Erosion Log (8 Inch) 1,688 Lin Foot 12,772.00 7.57 208-00010 Erosion Bales 158 Each 3,079.00 19.49 Colorado Department of Transportation 13:46 Tuesday, March 18, 2008 5 2007 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/07 THROUGH 12/31/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 208-00011 Erosion Bales (Weed Free) 4,149 Each 64,202.75 15.47 208-00015 Sand Bag 39 Each 330.00 8.46 208-00020 Silt Fence 63,558 Lin Foot 148,491.92 2.34 208-00021 Silt Fence (Reinforced) 100 Lin Foot 300.00 3.00 208-00030 Sediment Basin 4 Each 7,769.00 1,942.25 208-00033 Sediment Trap 3 Each 4,700.00 1,566.67 208-00040 Check Dam 32 Each 18,692.50 584.14 208-00045 Concrete Washout Structure 248 Each 205,812.81 829.89 208-00050 Storm Drain Inlet Protection 425 Each 116,946.70 275.17 208-00051 Storm Drain Inlet Protection 3,020 Lin Foot 63,148.56 20.91 208-00052 Storm Drain Inlet Protection (Type 2) 74 Lin Foot 6,364.00 86.00 208-00055 Rigid Inlet Protection Device 2 Each 1,000.00 500.00 208-00070 Stabilized Construction Entrance 123 Each 188,831.78 1,535.22 208-00100 Sediment Removal and Disposal 39 Lump Sum 154,373.57 3,958.30 208-00101 Sediment Removal and Disposal 235 Hour 71,657.20 304.92 208-00110 Sediment Removal and Disposal 10 Cubic Yard 720.00 72.00 208-00200 Erosion Control Supervisor 47 Lump Sum 226,897.95 4,827.62 208-00205 Erosion Control Supervisor 8,422 Hour 569,003.90 67.56 208-00206 Erosion Control Supervisor 450 Day 40,700.00 90.44 208-00300 Temporary Berms 3,090 Lin Foot 10,970.00 3.55 208-00400 Water Control 1 Lump Sum 14,000.00 14,000.00 209-00000 Water 300 M Gallon 18,000.00 60.00 209-00600 Dust Palliative (Magnesium Chloride) 68,602 Gallon 112,122.50 1.63 210-00001 Reset Structure 9 Each 31,950.00 3,550.00 210-00007 Reset Wheel Stop 1 Each 80.00 80.00 210-00010 Reset Mailbox Structure 26 Each 6,485.00 249.42 210-00011 Reset Mailbox Structure (Type 1) 170 Each 48,698.21 286.46 210-00012 Reset Mailbox Structure (Type 2) 26 Each 8,901.00 342.35 210-00013 Reset Mailbox Structure (Type 3) 32 Each 12,306.00 384.56 210-00015 Reset End Section 1 Each 833.01 833.01 210-00035 Reset Water Meter 6 Each 8,523.95 1,420.66 210-00050 Reset Fire Hydrant 9 Each 23,883.05 2,653.67 210-00060 Reset Marker 2 Each 760.00 380.00 210-00065 Reset Monument (Type 3A) 6 Each 1,800.00 300.00 210-00090 Reset Delineator 175 Each 2,406.25 13.75 210-00425 Reset Bridge Railing 419 Lin Foot 24,769.80 59.12 210-00440 Repair Curb 69 Lin Foot 6,210.00 90.00 210-00473 Reset TV Cameras 3 Each 6,870.00 2,290.00 Colorado Department of Transportation 13:46 Tuesday, March 18, 2008 6 2007 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/07 THROUGH 12/31/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 210-00478 Modify Power Control Board 1 Lump Sum 53,400.00 53,400.00 210-00500 Rebuild Portions of Present Structure 2 Each 15,550.00 7,775.00 210-00510 Rebuild Portions of Present Structure 3 Lump Sum 25,572.50 8,524.17 210-00520 Rebuild Portions of Present Structure 20 Sq Yard 10,200.00 510.00 210-00750 Reset Light Standard 57 Each 48,090.00 843.68 210-00760 Reset Luminaire 13 Each 4,531.50 348.58 210-00805 Reset Overhead Sign Structure 2 Each 21,806.20 10,903.10 210-00810 Reset Ground Sign 429 Each 97,258.88 226.71 210-00815 Reset Sign Panel 30 Each 8,671.00 289.03 210-00820 Reset Variable Message Sign 4 Each 50,770.15 12,692.54 210-00825 Reset Flashing Beacon 3 Each 2,650.00 883.33 210-00827 Reset Pull Box 2 Each 320.00 160.00 210-00831 Reset Traffic Signal Head 19 Each 6,274.00 330.21 210-00840 Reset Traffic Signal Pole 2 Each 1,320.00 660.00 210-00842 Reset Traffic Signal Mast Arm 2 Each 1,080.00 540.00 210-00848 Reset Traffic Signal Controller and Cabinet 1 Each 3,600.00 3,600.00 210-00855 Reset Traffic Signal Controller Cabinet 1 Each 3,183.00 3,183.00 210-00861 Reset Wiring 1 Lump Sum 168,200.00 168,200.00 210-00865 Reset Pedestrian Signal Head 4 Each 400.00 100.00 210-00866 Reset Fire Preemption Unit and Timer 6 Each 7,558.80 1,259.80 210-00870 Reset Coordination Unit 2 Each 870.00 435.00 210-00882 Reset Traffic Signal Vehicle Detector 3 Each 53,600.00 17,866.67 210-00890 Reset Intersection Detection System (Camera) 15 Each 14,173.56 944.90 210-01000 Reset Fence 1,229 Lin Foot 12,529.13 10.19 210-01011 Reset Gate 6 Each 3,080.66 513.44 210-01130 Reset Guardrail Type 3 19,241 Lin Foot 230,115.40 11.96 210-01136 Reset Guardrail Type 3 (Double) 950 Lin Foot 11,618.50 12.23 210-01140 Reset Guardrail Type 4 100 Lin Foot 5,000.00 50.00 210-01170 Reset Guardrail Type 7 2,400 Lin Foot 49,420.00 20.59 210-01180 Reset Guardrail (Special) 600 Lin Foot 6,000.00 10.00 210-01200 Reset End Anchorage 8 Each 4,328.00 541.00 210-01300 Reset Impact Attenuator 1 Each 1,100.00 1,100.00 210-02024 Relay Pipe (24 Inch) 70 Lin Foot 2,520.00 36.00 210-02900 Relay Riprap 230 Cubic Yard 5,750.00 25.00 210-03100 Replace Concrete Pavement 1,655 Sq Yard 504,775.00 305.00 210-04000 Adjust Structure 6 Each 4,312.40 718.73 210-04010 Adjust Manhole 396 Each 188,291.60 475.48 210-04015 Modify Manhole 6 Each 15,776.11 2,629.35 Colorado Department of Transportation 13:46 Tuesday, March 18, 2008 7 2007 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/07 THROUGH 12/31/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 210-04016 Modify Manhole (Special) 2 Each 3,232.00 1,616.00 210-04020 Modify Inlet 33 Each 85,675.32 2,596.22 210-04025 Modify Structure 18 Each 7,704.00 428.00 210-04030 Modify Guardrail 6,876 Lin Foot 84,538.00 12.29 210-04050 Adjust Valve Box 606 Each 183,400.02 302.64 210-04051 Adjust Valve Box (Special) 17 Each 7,310.00 430.00 210-04200 Adjust Guardrail 44,517 Lin Foot 86,972.85 1.95 211-00100 Drilling Hole 152 Lin Foot 3,800.00 25.00 211-03001 Dewatering Special 45 M Gallon 28,350.00 630.00 211-05001 Crack Preparation (Type 1) 300 Lin Foot 45,000.00 150.00 211-05002 Crack Preparation (Type 2) 1,200 Lin Foot 60,000.00 50.00 211-05003 Crack Preparation (Type 3) 300 Lin Foot 22,500.00 75.00 212-00005 Seeding (Native) 20 Pound 600.00 30.00 212-00006 Seeding (Native) 716 Acre 402,267.47 561.83 212-00007 Seeding (Native) (Hydraulic) 1 Acre 4,525.00 4,525.00 212-00009 Seeding (Temporary) 4 Acre 636.00 159.00 212-00011 Seeding (Lawn) 1 Acre 3,600.00 3,600.00 212-00015 Seeding (Forbs) 16 Pound 880.00 55.00 212-00028 Seeding (Wetlands) 2 Acre 2,752.50 1,376.25 212-00032 Soil Conditioning 324 Acre 859,300.42 2,652.16 212-00040 Soil Preparation (Lawn) 1 Acre 5,040.00 5,040.00 212-00047 Soil Preparation (Special) 1 Acre 7,865.00 7,865.00 212-00050 Sod 1,660 Sq Foot 1,826.00 1.10 212-00100 Tree Retention and Protection 1 Lump Sum 5,500.00 5,500.00 212-00900 Compost 806 Cubic Yard 46,103.20 57.20 213-00000 Mulching 6 Acre 8,588.80 1,431.47 213-00001 Mulching 1 Ton 666.90 666.90 213-00002 Mulching (Weed Free Hay) 492 Acre 213,403.44 433.75 213-00003 Mulching (Weed Free) 304 Acre 91,561.73 301.19 213-00004 Mulching (Weed Free Straw) 45 Acre 52,351.22 1,163.36 213-00005 Mulching (Decorative) 7,085 Cubic Foot 18,610.25 2.63 213-00008 Mulching (Wood Chip) 1,614 Cubic Foot 7,334.85 4.54 213-00011 Mulching (Hydraulic) 8 Acre 8,073.49 1,009.19 213-00061 Mulch Tackifier 164,778 Pound 288,895.41 1.75 213-00070 Landscape Weed Barrier Fabric 11 Sq Yard 121.00 11.00 213-00100 Soil Binder 98 Acre 33,765.64 344.55 213-00150 Bonded Fiber Matrix 0 Acre 1,150.00 213-00440 Metal Landscape Border (1/8x4 Inch) 1,050 Lin Foot 3,675.00 3.50 Colorado Department of Transportation 13:46 Tuesday, March 18, 2008 8 2007 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/07 THROUGH 12/31/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 213-00460 Metal Landscape Border (3/16x4 Inch) 63 Lin Foot 292.95 4.65 213-00700 Landscape Boulder 726 Each 157,800.00 217.36 213-00705 Landscape Boulder (Special) 25 Each 15,987.50 639.50 214-00000 Landscape Maintenance 4 Lump Sum 54,357.00 13,589.25 214-00155 Plant (Ball and Burlap) 47 Each 10,236.60 217.80 214-00205 Deciduous Tree (5 Gallon Container) 39 Each 2,845.56 72.96 214-00215 Deciduous Tree (1.5 Inch Caliper) 54 Each 16,322.70 302.27 214-00220 Deciduous Tree (2 Inch Caliper) 103 Each 47,618.00 462.31 214-00225 Deciduous Tree (2.5 Inch Caliper) 6 Each 3,756.00 626.00 214-00230 Deciduous Tree (3 Inch Caliper) 35 Each 18,790.00 536.86 214-00280 Deciduous Tree (8 Foot) 248 Each 54,514.40 219.82 214-00350 Deciduous Shrub (5 Gallon Container) 759 Each 38,537.00 50.77 214-00370 Deciduous Shrub (7 Gallon Container) 48 Each 2,745.60 57.20 214-00508 Evergreen Tree (8 Foot) (Ball and Burlap) 235 Each 136,974.00 582.87 214-00510 Evergreen Tree (10 Foot) (Ball and Burlap) 12 Each 10,356.00 863.00 214-00512 Evergreen Tree (12 Foot) (Ball and Burlap) 12 Each 9,900.00 825.00 214-00601 Evergreen Shrub (Tubeling) 450 Each 4,950.00 11.00 214-00650 Evergreen Shrub (5 Gallon Container) 45 Each 2,710.00 60.22 214-00905 Perennials (2.25 Inch Pot) 100 Each 700.00 7.00 214-00910 Perennials (1 Gallon Container) 28 Each 770.00 27.50 214-00950 Perennials (5 Gallon Container) 55 Each 3,025.00 55.00 214-01010 Brush Layer Cutting 4,460 Each 23,921.20 5.36 214-01015 Willow Cuttings 500 Each 1,000.00 2.00 214-01025 Dormant Log Cutting 6 Each 870.00 145.00 215-00000 Transplant Shrub 16 Each 14,432.20 902.01 215-00600 Transplant Plug 50 Each 540.00 10.80 216-00015 Soil Retention Blanket (Excelsior) 4,177 Sq Yard 23,109.00 5.53 216-00021 Soil Retention Blanket (Class 1) 2,260 Sq Yard 2,825.00 1.25 216-00022 Soil Retention Blanket (Class 2) 620 Sq Yard 930.00 1.50 216-00030 Soil Retention Blanket (Special) 1,077 Sq Yard 6,367.74 5.91 216-00035 Soil Retention Blanket (Plastic) 9,448 Sq Yard 46,953.00 4.97 216-00037 Soil Retention Blanket (Coconut) 1,781 Sq Yard 2,656.55 1.49 216-00039 Soil Retention Blanket (Straw) 4,713 Sq Yard 11,929.66 2.53 216-00041 Soil Retention Blanket (Straw/Coconut) 172,305 Sq Yard 267,929.11 1.55 217-00020 Herbicide Treatment 145 Hour 28,342.10 195.46 250-00010 Environmental Health and Safety Management 12 Lump Sum 56,257.42 4,688.12 250-00050 Monitoring Technician 422 Hour 41,880.20 99.24 250-00110 Health and Safety Officer 566 Hour 66,257.60 117.06 Colorado Department of Transportation 13:46 Tuesday, March 18, 2008 9 2007 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/07 THROUGH 12/31/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 250-00120 Material Sampling and Delivery 135 Each 18,357.00 135.98 250-00200 Material Handling (Stockpile) 1,194 Cubic Yard 22,695.00 19.01 250-00210 Solid Waste Disposal 932 Cubic Yard 58,084.00 62.32 250-00220 Hazardous Waste Disposal 109 Cubic Yard 18,615.00 170.78 304-01000 Aggregate Base Course (Class 1) 5,245 Ton 161,835.70 30.86 304-01005 Aggregate Base Course (Class 1) 16 Cubic Yard 1,088.00 68.00 304-02000 Aggregate Base Course (Class 2) 327 Ton 21,255.00 65.00 304-02005 Aggregate Base Course (Class 2) 80 Cubic Yard 8,000.00 100.00 304-03000 Aggregate Base Course (Class 3) 10,858 Ton 217,160.00 20.00 304-05000 Aggregate Base Course (Class 5) 36 Ton 2,808.00 78.00 304-05006 Aggregate Base Course (Class 5)(Special) 37,225 Sq Yard 381,184.00 10.24 304-06000 Aggregate Base Course (Class 6) 272,376 Ton 3,659,943.86 13.44 304-06004 Aggregate Base Course (Class 6) 17,455 Sq Yard 78,547.50 4.50 304-06007 Aggregate Base Course (Class 6) 9,811 Cubic Yard 389,493.10 39.70 304-06008 Aggregate Base Course (Class 6) (Special) 16,428 Cubic Yard 77,835.80 4.74 304-06009 Aggregate Base Course (Class 6) (Special) 3,416 Ton 97,356.00 28.50 304-07000 Aggregate Base Course (Class 7) 19,690 Ton 487,617.08 24.76 304-07005 Aggregate Base Course (Class 7) 1,688 Cubic Yard 37,980.00 22.50 304-07009 Aggregate Base Course (Class 7) (Special) 3,845 Ton 3,845.00 1.00 304-09000 Aggregate Base Course (Special) 11,501 Cubic Yard 349,270.95 30.37 304-09014 Aggregate Base Course (Special) 8,638 Ton 170,661.50 19.76 304-09055 Aggregate Base Course (Blotter Material) 55 Ton 900.00 16.36 306-00000 Reconditioning 4 Mile 50,600.00 12,650.00 306-01000 Reconditioning 9,342 Sq Yard 49,567.80 5.31 307-00000 Hydrated Lime 1,310 Ton 181,939.50 138.89 310-00400 Process Asphalt Mat For Base Course 137,479 Sq Yard 267,008.50 1.94 310-00608 Full Depth Reclamation of Hot Mix Asphalt Pavement (0 220,886 Sq Yard 585,147.75 2.65 310-00610 Full Depth Reclamation of Hot Mix Asphalt Pavement (8 319,291 Sq Yard 713,534.10 2.23 310-00614 Full Depth Reclamation Of Hot Mix Asphalt Pavement (1 27,034 Sq Yard 56,771.40 2.10 310-00700 Asphalt Emulsion Full Depth Reclamation 25,813 Sq Yard 109,705.25 4.25 403-00720 Hot Bituminous Pavement (Patching) (Asphalt) 22,737 Ton 2,845,467.83 125.15 403-00721 Hot Bituminous Pavement (Patching) (Asphalt) 2,600 Sq Yard 214,492.50 82.50 403-02000 Hot Bituminous Pavement (Special) 3,184 Ton 233,644.00 73.38 403-05000 Hot Mix Asphalt (Reflective Crack Interlayer) 6,934 Ton 875,945.00 126.33 403-09210 Stone Matrix Asphalt 134,311 Ton 9,629,813.65 71.70 403-09221 Stone Matrix Asphalt (Fibers)(Asphalt) 40,138 Ton 2,611,363.10 65.06 403-09500 Furnish Hot Bituminous Pavement 3,617 Ton 205,773.00 56.89 403-33701 Hot Bituminous Pavement (Grading S) (75) 6,214 Ton 360,412.00 58.00 Colorado Department of Transportation 13:46 Tuesday, March 18, 2008 10 2007 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/07 THROUGH 12/31/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 403-33721 Hot Bituminous Pavement (Grading S) (75) (PG 58-28) 551 Ton 27,565.00 50.03 403-33731 Hot Bituminous Pavement (Grading S) (75) (PG 58-34) 398 Ton 22,697.40 57.03 403-33741 Hot Bituminous Pavement (Grading S) (75) (PG 64-22) 83,419 Ton 4,804,785.90 57.60 403-33751 Hot Bituminous Pavement (Grading S) (75) (PG 64-28) 32,458 Ton 2,139,625.00 65.92 403-33841 Hot Bituminous Pavement (Grading S) (100) (PG 64-22) 49,754 Ton 2,753,438.98 55.34 403-33851 Hot Bituminous Pavement (Grading S) (100) (PG 64-28) 22,203 Ton 1,332,180.00 60.00 403-33871 Hot Bituminous Pavement (Grading S) (100) (PG 76-28) 1,866 Ton 118,472.34 63.49 403-34641 Hot Bituminous Pavement (Grading SX) (50) (PG 64-22) 20,301 Ton 1,612,914.45 79.45 403-34701 Hot Bituminous Pavement (Grading SX) (75) 225,010 Ton 11,260,898.44 50.05 403-34721 Hot Bituminous Pavement (Grading SX) (75) (PG 58-28) 28,269 Ton 1,794,241.55 63.47 403-34731 Hot Bituminous Pavement (Grading SX) (75) (PG 58-34) 13,604 Ton 1,246,723.79 91.64 403-34741 Hot Bituminous Pavement (Grading SX) (75) (PG 64-22) 267,095 Ton 13,916,156.01 52.10 403-34751 Hot Bituminous Pavement (Grading SX) (75) (PG 64-28) 100,673 Ton 5,766,351.00 57.28 403-34801 Hot Bituminous Pavement (Grading SX) (100) 13,000 Ton 719,232.00 55.33 403-34841 Hot Bituminous Pavement (Grading SX) (100) (PG 64-22) 136,018 Ton 7,577,222.50 55.71 403-34851 Hot Bituminous Pavement (Grading SX) (100) (PG 64-28) 30,327 Ton 2,191,390.00 72.26 403-34871 Hot Bituminous Pavement (Grading SX) (100) (PG 76-28) 141,424 Ton 9,515,339.70 67.28 403-36400 Hot Bituminous Pavement (Grading SX) (75) 19,251 Ton 866,295.00 45.00 405-00000 Heating and Scarifying Treatment 80,883 Sq Yard 323,532.00 4.00 405-00100 Heating and Remixing Treatment 134,699 Sq Yard 673,495.00 5.00 406-09500 Cold Bituminous Pavement (Recycle) 710,815 Sq Yard 1,244,939.20 1.75 408-01000 Hot Poured Joint and Crack Sealant 7 Ton 34,490.00 4,927.14 409-01015 Cover Coat Material (Type I) 737,573 Sq Yard 766,139.60 1.04 409-02030 Cover Coat Material (Type I) Special 668,352 Sq Yard 901,901.68 1.35 409-05010 Thin Bonded Wearing Course (Non-Bituminous) 1,502 Sq Yard 75,100.00 50.00 411-03342 Asphalt Cement Performance Grade (PG 64-28) 4,872 Ton 2,331,030.00 478.45 411-03345 Asphalt Cement Performance Grade (PG 76-28) 3,160 Ton 1,614,075.00 510.78 411-03352 Asphalt Cement Performance Grade (PG 58-28) 6,463 Ton 2,768,771.00 428.40 411-03355 Asphalt Cement Performance Grade (PG 58-34) 4,892 Ton 2,329,753.55 476.24 411-10216 Emulsified Asphalt (CRS-2P) 780 Gallon 9,843.60 12.62 411-10253 Emulsified Asphalt (CSS-1H) 40,415 Gallon 110,725.34 2.74 411-10255 Emulsified Asphalt (Slow-Setting) 467,641 Gallon 746,740.08 1.60 411-10258 Emulsified Asphalt (Rapid-Setting)(Polymerized) 2,825 Ton 952,432.00 337.14 411-10259 Emulsified Asphalt (Medium-Setting)(Polymerized) 158 Ton 116,300.00 736.08 411-10300 Emulsified Asphalt (Prime Coat) 12,181 Gallon 60,948.40 5.00 411-21020 Liquid Asphaltic Material (MC-70) 5,337 Gallon 70,448.40 13.20 411-90010 Asphalt Rejuvenating Agent 95,802 Gallon 234,774.00 2.45 411-90040 Recycling Agent 610,038 Gallon 1,134,474.70 1.86 Colorado Department of Transportation 13:46 Tuesday, March 18, 2008 11 2007 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/07 THROUGH 12/31/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 411-90050 Emulsified Recycling Agent 138,519 Gallon 242,408.25 1.75 412-00000 Furnish Concrete Pavement 41,241 Cubic Yard 3,453,933.75 83.75 412-00050 Place Concrete Pavement 145,043 Sq Yard 1,073,318.20 7.40 412-00600 Concrete Pavement (6 Inch) 2,549 Sq Yard 149,120.50 58.50 412-00605 Concrete Pavement (6 Inch) (Fast Track) 796 Sq Yard 63,680.00 80.00 412-00715 Concrete Pavement (7 Inch) (Reinforced) 342 Sq Yard 63,270.00 185.00 412-00800 Concrete Pavement (8 Inch) 1,044 Sq Yard 62,760.00 60.11 412-00805 Concrete Pavement (8 Inch) (Fast Track) 3,269 Sq Yard 228,830.00 70.00 412-00850 Concrete Pavement (8-1/2 Inch) 10,334 Sq Yard 301,369.50 29.16 412-00870 Concrete Pavement (8-1/2 Inch) (Fast Track) 191 Sq Yard 17,190.00 90.00 412-00925 Concrete Pavement (9-1/4 Inch) 471 Sq Yard 65,940.00 140.00 412-01000 Concrete Pavement (10 Inch) 41,104 Sq Yard 1,360,525.20 33.10 412-01015 Concrete Pavement (10 Inch) (Reinforced) 1,244 Sq Yard 174,160.00 140.00 412-01025 Concrete Pavement (10-1/4 Inch) 197,063 Sq Yard 6,667,683.60 33.84 412-01050 Concrete Pavement (10-1/2 Inch) 19,514 Sq Yard 682,990.00 35.00 412-01100 Concrete Pavement (11 Inch) 28,523 Sq Yard 2,219,600.50 77.82 412-01120 Concrete Pavement (11 Inch) (Fast Track) 13,430 Sq Yard 1,007,250.00 75.00 412-01150 Concrete Pavement (11-1/2 Inch) 30,807 Sq Yard 1,640,472.75 53.25 412-01152 Concrete Pavement (11-1/2 Inch) (Fast Track) 1,350 Sq Yard 81,337.50 60.25 412-01200 Concrete Pavement (12 Inch) 35,533 Sq Yard 1,696,104.00 47.73 412-01220 Concrete Pavement (12 Inch) (Fast Track) 691 Sq Yard 58,735.00 85.00 412-01300 Concrete Pavement (13 Inch) 232,099 Sq Yard 9,051,861.00 39.00 412-14000 Sawing and Sealing Concrete Pavement Joints 330,130 Lin Foot 497,145.00 1.51 412-15000 Routing and Sealing Concrete Pavement Cracks 435 Lin Foot 2,436.00 5.60 412-15050 Cross Stitching 1,320 Each 50,820.00 38.50 412-18020 Rubbilization of Concrete Pavement (Resonant Breaker) 66,170 Sq Yard 354,009.50 5.35 412-18030 Rubbilization of Concrete Pavement (Multi-Head Breake 66,170 Sq Yard 254,754.50 3.85 412-19000 Hot Poured Concrete Joint Sealant 2,200 Lin Foot 14,850.00 6.75 420-00000 Geomembrane 360 Sq Yard 2,520.00 7.00 420-00100 Geotextile (Erosion Control) (Class A) 6,536 Sq Yard 40,038.43 6.13 420-00101 Geotextile (Erosion Control) (Class B) 13,189 Sq Yard 65,783.49 4.99 420-00110 Geotextile (Drainage) (Class A) 10,962 Sq Yard 28,818.08 2.63 420-00111 Geotextile (Drainage) (Class B) 1,597 Sq Yard 1,597.00 1.00 420-00130 Geotextile (Separator) (Class A) 7,720 Sq Yard 30,838.30 3.99 420-00131 Geotextile (Separator) (Class B) 3,000 Sq Yard 9,000.00 3.00 420-00200 Geotextile (Weed Barrier) 886 Sq Yard 4,430.00 5.00 420-00201 Geotextile (Weed Barrier) (Special) 180 Sq Yard 7,690.50 42.73 420-00500 Geotextile (Paving) 4,351 Sq Yard 19,246.65 4.42 Colorado Department of Transportation 13:46 Tuesday, March 18, 2008 12 2007 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/07 THROUGH 12/31/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 420-00510 Geotextile (Crack Reduction) (High Density) 16,847 Sq Yard 109,292.39 6.49 502-00460 Pile Tip 20 Each 2,150.00 107.50 502-10836 Steel Piling (HP 8x36) 172 Lin Foot 18,920.00 110.00 502-11253 Steel Piling (HP 12x53) 1,107 Lin Foot 45,387.00 41.00 502-11274 Steel Piling (HP 12x74) 2,701 Lin Foot 140,427.90 51.99 503-00018 Drilled Caisson (18 Inch) 588 Lin Foot 82,769.56 140.76 503-00024 Drilled Caisson (24 Inch) 960 Lin Foot 95,808.00 99.80 503-00030 Drilled Caisson (30 Inch) 4,522 Lin Foot 581,084.46 128.50 503-00036 Drilled Caisson (36 Inch) 2,096 Lin Foot 549,448.69 262.14 503-00042 Drilled Caisson (42 Inch) 2,106 Lin Foot 660,640.01 313.69 503-00048 Drilled Caisson (48 Inch) 2,945 Lin Foot 1,449,737.90 492.27 503-00054 Drilled Caisson (54 Inch) 412 Lin Foot 169,392.00 411.15 503-00060 Drilled Caisson (60 Inch) 750 Lin Foot 435,970.16 581.29 503-00096 Drilled Caisson (96 Inch) 408 Lin Foot 510,000.00 1,250.00 503-01060 Micropile (6 Inch) 1,260 Lin Foot 215,966.00 171.40 503-01120 Micropile (12 Inch) 502 Lin Foot 62,750.00 125.00 504-04230 MSE Wall (Repair) 1 Lump Sum 200,000.00 200,000.00 504-04410 Block Facing 70,027 Sq Foot 864,329.18 12.34 504-04420 Precast Panel Facing 6,925 Sq Foot 350,140.00 50.56 504-04425 Architectural Precast Concrete Panel 1,048 Sq Foot 135,192.00 129.00 504-06100 Ground Nailed Wall 6,410 Sq Foot 544,850.00 85.00 504-06320 Ground Nail (20 Foot) 23 Each 24,840.00 1,080.00 504-06400 Soil Nail Wall 446 Sq Foot 25,390.78 56.93 504-08255 Masonry Landscape Wall (Dry Stack) 623 Sq Foot 31,274.60 50.20 506-00000 Riprap 1,671 Cubic Yard 93,912.00 56.20 506-00010 Riprap (Special) 1,133 Cubic Yard 54,961.83 48.51 506-00030 Grouted Riprap 339 Cubic Yard 30,167.36 88.99 506-00206 Riprap (6 Inch) 2,378 Cubic Yard 136,857.00 57.55 506-00209 Riprap (9 Inch) 2,136 Cubic Yard 151,683.50 71.01 506-00212 Riprap (12 Inch) 6,315 Cubic Yard 345,441.68 54.70 506-00218 Riprap (18 Inch) 577 Cubic Yard 83,356.94 144.47 506-00224 Riprap (24 Inch) 4,909 Cubic Yard 368,369.42 75.04 506-00243 Riprap (42 Inch) (Special) 1,197 Cubic Yard 179,550.00 150.00 506-01020 Geogrid Reinforcement 1,363 Sq Yard 6,815.00 5.00 507-00000 Concrete Slope and Ditch Paving 299 Cubic Yard 92,290.30 308.66 507-00100 Concrete Slope and Ditch Paving (Reinforced) 1,106 Cubic Yard 335,272.16 303.14 507-00105 Concrete Slope and Ditch Paving (Reinforced) (Colored 170 Cubic Yard 46,665.00 274.50 507-00200 Dry Rubble Slope and Ditch Paving 6 Cubic Yard 2,250.00 375.00 Colorado Department of Transportation 13:46 Tuesday, March 18, 2008 13 2007 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/07 THROUGH 12/31/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 507-00400 Bituminous Slope and Ditch Paving (Asphalt) 160 Ton 32,673.25 204.21 507-00550 Concrete Lined Ditch 324 Lin Foot 12,960.00 40.00 507-00700 Slope and Ditch Paving (Special) 1,313 Cubic Yard 431,077.50 328.31 508-00000 Untreated Timber 0 M Ft Bd Me 3,750.00 509-00000 Structural Steel 1,961,005 Pound 2,923,662.15 1.49 509-00001 Structural Steel (Galvanized) 22,052 Pound 83,896.00 3.80 509-08100 Provide Temporary Support 2 Lump Sum 123,201.75 61,600.88 509-90002 Paint Existing Structure (Special) 550 Gallon 165,260.00 300.47 509-90003 Paint Structural Steel 2 Lump Sum 16,300.00 8,150.00 510-10079 Structural Plate Arch Pipe (5 Foot 10 Inch X 6 Foot 6 108 Lin Foot 54,000.00 500.00 510-10087 Structural Plate Arch Pipe (5 Foot 10 Inch X 7 Foot 7 36 Lin Foot 19,800.00 550.00 512-00101 Bearing Device (Type I) 105 Each 77,773.69 740.70 512-00103 Bearing Device (Type III) 8 Each 71,028.00 8,878.50 513-00600 Bridge Drain 7 Each 26,000.00 3,714.29 513-00690 Bridge Drain (Special) 12 Each 86,304.80 7,192.07 514-00000 Pipe Railing 95 Lin Foot 9,500.00 100.00 514-00100 Hand Rail 75 Lin Foot 8,250.00 110.00 514-00201 Pedestrian Railing (Steel)(Special) 3,331 Lin Foot 931,144.00 279.54 514-01011 Bridge Rail (Steel) 558 Lin Foot 139,500.00 250.00 515-00120 Waterproofing (Membrane) 50,071 Sq Yard 510,519.68 10.20 515-00122 Waterproofing (Membrane)(Special) 792 Sq Yard 68,112.00 86.00 515-00400 Concrete Sealer 4,645 Sq Yard 32,728.25 7.05 515-00410 Concrete Sealer (Calcium Nitrite) 1,991 Sq Yard 83,083.50 41.73 518-00000 Bridge Compression Joint Sealer 40 Lin Foot 10,000.00 250.00 518-01002 Bridge Expansion Device (0-2 Inch) 1,957 Lin Foot 239,720.00 122.49 518-01004 Bridge Expansion Device (0-4 Inch) 1,920 Lin Foot 358,784.81 186.87 518-01009 Bridge Expansion Device (0-9 Inch) 206 Lin Foot 247,921.00 1,203.50 518-02100 Polymer Mortar End Dam 361 Cubic Foot 158,721.00 439.67 518-03000 Sawing and Sealing Bridge Joint 228 Lin Foot 3,192.00 14.00 518-03100 Rapid Cure Silicone Joint Seal 921 Lin Foot 43,644.50 47.39 519-03000 Thin Bonded Epoxy Overlay 740 Sq Yard 31,080.00 42.00 601-01000 Concrete Class B 477 Cubic Yard 344,293.45 721.79 601-01025 Concrete Class B (Miscellaneous) 322 Cubic Yard 105,819.50 328.63 601-01040 Concrete Class B (Bridge) 11 Cubic Yard 7,590.00 690.00 601-01050 Concrete Class B (Wall) 206 Cubic Yard 96,164.06 466.82 601-03000 Concrete Class D 114 Cubic Yard 73,731.25 646.77 601-03020 Concrete Class D (Miscellaneous) 7 Cubic Yard 2,625.00 375.00 601-03027 Concrete Class D (Special) 5 Cubic Yard 17,995.00 3,599.00 Colorado Department of Transportation 13:46 Tuesday, March 18, 2008 14 2007 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/07 THROUGH 12/31/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 601-03030 Concrete Class D (Box Culvert) 2,436 Cubic Yard 921,705.13 378.37 601-03040 Concrete Class D (Bridge) 15,743 Cubic Yard 7,457,474.57 473.70 601-03041 Concrete Class D (Bridge) (Special) 400 Cubic Yard 176,884.50 442.21 601-03050 Concrete Class D (Wall) 389 Cubic Yard 278,568.95 716.12 601-03540 Concrete Class DT (Deck Topping) 267 Cubic Yard 116,385.75 435.90 601-04000 Concrete Class E 1 Cubic Yard 3,500.00 3,500.00 601-05010 Concrete Class H (Special) 51 Cubic Yard 40,988.70 803.70 601-05045 Concrete Class S40 9,361 Cubic Yard 6,679,358.90 713.53 601-05050 Concrete Class S50 126 Cubic Yard 95,553.36 758.36 601-05540 Concrete Class HT (Deck Topping) 732 Cubic Yard 320,994.50 438.52 601-06020 Concrete (Patching) (Polymer) 9 Cubic Yard 52,613.25 5,845.92 601-06100 Concrete (Patching) 35 Cubic Yard 34,211.51 977.47 601-06150 Concrete (Patching) 914 Sq Foot 157,348.00 172.15 601-06400 Grout (Bridge)(Special) 14 Cubic Foot 2,700.00 192.86 601-10200 Mud Jacking 6 Hour 4,920.00 820.00 601-21010 Precast Concrete Unit 66 Cubic Yard 39,600.00 600.00 601-25730 Precast Concrete Deck Panel (3 Inch) 3,149 Sq Yard 248,242.00 78.83 601-40002 Masonry Veneer (Brick) 768 Sq Foot 10,752.00 14.00 601-40006 Cut Stone Veneer (Slab) 444 Sq Foot 11,100.00 25.00 601-40007 Cut Stone Veneer (Ashler) 516 Sq Foot 8,256.00 16.00 601-40010 Masonry Wall 1,792 Sq Foot 17,920.00 10.00 601-40250 Bridge Deck Finish (Sawed Grooves) 644 Sq Yard 4,669.00 7.25 601-40300 Structural Concrete Coating 8,378 Sq Yard 66,598.23 7.95 601-40301 Structural Concrete Coating 14,759 Sq Foot 16,972.85 1.15 601-40302 Structural Concrete Coating (Anti-Graffiti) 16,256 Sq Foot 12,029.44 0.74 601-40401 Structural Concrete Stain 285,332 Sq Foot 246,905.10 0.87 601-50000 Glazed Wall Tile 60,000 Sq Foot 1,500,000.00 25.00 601-50010 Glazed Wall Tile (Spare) 55,000 Each 55,000.00 1.00 602-00000 Reinforcing Steel 1,315,214 Pound 1,228,314.06 0.93 602-00020 Reinforcing Steel (Epoxy Coated) 5,025,948 Pound 5,145,814.09 1.02 602-00200 Weld Reinforcing Steel 7,559 Each 15,118.00 2.00 602-20003 Outlet Structure (Special) 2 Each 6,108.60 3,054.30 603-00001 Annular Space Grouting 150 Cubic Yard 55,813.50 372.09 603-00025 Culvert Lining (24 Inch)(Special) 93 Lin Foot 88,350.00 950.00 603-00042 Culvert Lining (42 Inch) 508 Lin Foot 129,540.00 255.00 603-00048 Culvert Lining (48 Inch) 508 Lin Foot 144,780.00 285.00 603-00049 Culvert Lining (48 Inch)(Special) 105 Lin Foot 197,400.00 1,880.00 603-00054 Culvert Lining (54 Inch) 486 Lin Foot 153,090.00 315.00 Colorado Department of Transportation 13:46 Tuesday, March 18, 2008 15 2007 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/07 THROUGH 12/31/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 603-01125 12 Inch Reinforced Concrete Pipe (Complete In Place) 159 Lin Foot 11,075.94 69.66 603-01150 15 Inch Reinforced Concrete Pipe 8 Lin Foot 2,000.00 250.00 603-01155 15 Inch Reinforced Concrete Pipe (Complete In Place) 16 Lin Foot 912.00 57.00 603-01180 18 Inch Reinforced Concrete Pipe 1,943 Lin Foot 145,432.00 74.85 603-01185 18 Inch Reinforced Concrete Pipe (Complete In Place) 7,658 Lin Foot 419,480.94 54.78 603-01240 24 Inch Reinforced Concrete Pipe 4,583 Lin Foot 323,107.24 70.50 603-01245 24 Inch Reinforced Concrete Pipe (Complete In Place) 7,456 Lin Foot 562,938.52 75.50 603-01275 27 Inch Reinforced Concrete Pipe (Complete In Place) 212 Lin Foot 20,140.00 95.00 603-01300 30 Inch Reinforced Concrete Pipe 2,397 Lin Foot 187,446.00 78.20 603-01305 30 Inch Reinforced Concrete Pipe (Complete In Place) 894 Lin Foot 109,292.40 122.25 603-01360 36 Inch Reinforced Concrete Pipe 240 Lin Foot 34,655.01 144.40 603-01365 36 Inch Reinforced Concrete Pipe (Complete In Place) 6,820 Lin Foot 847,330.15 124.24 603-01425 42 Inch Reinforced Concrete Pipe (Complete In Place) 98 Lin Foot 19,502.00 199.00 603-01545 54 Inch Reinforced Concrete Pipe (Complete In Place) 865 Lin Foot 103,887.14 120.10 603-01600 60 Inch Reinforced Concrete Pipe 123 Lin Foot 27,060.00 220.00 603-02180 23x14 Inch Reinforced Concrete Pipe Elliptical 101 Lin Foot 10,580.76 104.76 603-02185 23x14 Inch Reinforced Concrete Pipe (Complete In Plac 40 Lin Foot 6,720.00 168.00 603-02240 30x19 Inch Reinforced Concrete Pipe Elliptical 64 Lin Foot 7,350.40 114.85 603-02300 38x24 Inch Reinforced Concrete Pipe Elliptical 1,520 Lin Foot 119,738.70 78.78 603-02425 53x34 Inch Reinforced Concrete Pipe Elliptical 52 Lin Foot 13,676.00 263.00 603-02480 60x38 Inch Reinforced Concrete Pipe Elliptical 556 Lin Foot 83,182.68 149.61 603-02485 60x38 Inch Reinforced Concrete Pipe Elliptical (CIP) 92 Lin Foot 16,560.00 180.00 603-03180 18 Inch Reinforced Concrete Pipe Special 37 Lin Foot 5,413.10 146.30 603-03361 36 Inch Reinforced Concrete Pipe Special (Install Onl 56 Lin Foot 2,999.92 53.57 603-03601 60 Inch Reinforced Concrete Pipe Special (Install Onl 113 Lin Foot 171,900.00 1,521.24 603-05018 18 Inch Reinforced Concrete End Section 41 Each 32,333.06 788.61 603-05024 24 Inch Reinforced Concrete End Section 96 Each 89,820.77 935.63 603-05030 30 Inch Reinforced Concrete End Section 6 Each 7,779.09 1,296.52 603-05036 36 Inch Reinforced Concrete End Section 17 Each 24,019.11 1,412.89 603-05054 54 Inch Reinforced Concrete End Section 1 Each 1,671.75 1,671.75 603-05060 60 Inch Reinforced Concrete End Section 2 Each 4,000.00 2,000.00 603-05124 30x19 Inch Reinforced Concrete End Section Elliptical 2 Each 3,624.02 1,812.01 603-05130 38x24 Inch Reinforced Concrete End Section Elliptical 4 Each 5,714.72 1,428.68 603-05148 60x38 Inch Reinforced Concrete End Section Elliptical 6 Each 13,345.06 2,224.18 603-07240 24 Inch Reinforced Concrete Pipe (Jacked) 120 Lin Foot 91,701.60 764.18 603-07300 30 Inch Reinforced Concrete Pipe (Jacked) 196 Lin Foot 102,670.68 523.83 603-07360 36 Inch Reinforced Concrete Pipe (Jacked) 436 Lin Foot 339,077.18 777.70 603-10120 12 Inch Corrugated Steel Pipe 662 Lin Foot 49,190.00 74.31 Colorado Department of Transportation 13:46 Tuesday, March 18, 2008 16 2007 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/07 THROUGH 12/31/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 603-10180 18 Inch Corrugated Steel Pipe 796 Lin Foot 49,325.60 61.97 603-10240 24 Inch Corrugated Steel Pipe 802 Lin Foot 92,214.68 114.98 603-10300 30 Inch Corrugated Steel Pipe 91 Lin Foot 8,183.76 89.93 603-10360 36 Inch Corrugated Steel Pipe 20 Lin Foot 2,604.40 130.22 603-10480 48 Inch Corrugated Steel Pipe 234 Lin Foot 34,320.00 146.67 603-10720 72 Inch Corrugated Steel Pipe 64 Lin Foot 17,600.00 275.00 603-15024 24 Inch Equivalent Corrugated Steel Pipe Arch 33 Lin Foot 1,243.77 37.69 603-30015 15 Inch Steel End Section 4 Each 1,687.68 421.92 603-30018 18 Inch Steel End Section 26 Each 8,980.40 345.40 603-30024 24 Inch Steel End Section 40 Each 25,052.58 626.31 603-30030 30 Inch Steel End Section 6 Each 3,149.62 524.94 603-30036 36 Inch Steel End Section 4 Each 3,975.90 993.98 603-30048 48 Inch Steel End Section 3 Each 5,500.00 1,833.33 603-33036 36 Inch Pipe Safety End Treatment 1 Each 2,000.00 2,000.00 603-50008 8 Inch Plastic Pipe 166 Lin Foot 7,968.00 48.00 603-50012 12 Inch Plastic Pipe 250 Lin Foot 10,000.00 40.00 603-50015 15 Inch Plastic Pipe 361 Lin Foot 15,370.24 42.58 603-50024 24 Inch Plastic Pipe 88 Lin Foot 8,152.00 92.64 603-50072 72 Inch Plastic Pipe 326 Lin Foot 162,775.06 499.31 603-70606 6x6 Foot Concrete Box Culvert (Precast) 61 Lin Foot 37,210.00 610.00 603-71006 10x6 Foot Concrete Box Culvert (Precast) 373 Lin Foot 201,397.62 539.94 603-71008 10x8 Foot Concrete Box Culvert (Precast) 140 Lin Foot 146,493.20 1,046.38 603-72008 20x8 Foot Concrete Box Culvert (Precast) 60 Lin Foot 123,000.00 2,050.00 603-82012 12 Inch Ductile Iron Pipe 132 Lin Foot 5,742.00 43.50 604-00305 Inlet Type C (5 Foot) 31 Each 83,764.14 2,702.07 604-00310 Inlet Type C (10 Foot) 12 Each 34,698.66 2,891.56 604-00350 Inlet Type C (Special) 2 Each 12,900.00 6,450.00 604-00505 Inlet Type D (5 Foot) 2 Each 7,988.98 3,994.49 604-00510 Inlet Type D (10 Foot) 2 Each 8,700.00 4,350.00 604-00515 Inlet Type D (15 Foot) 1 Each 4,793.39 4,793.39 604-00550 Inlet Type D (Special) 8 Each 42,547.32 5,318.42 604-13005 Inlet Type 13 (5 Foot) 4 Each 12,385.47 3,096.37 604-13010 Inlet Type 13 (10 Foot) 1 Each 7,952.54 7,952.54 604-13653 Inlet Type 13 (5 Foot)(Special)(3 Unit) 1 Each 3,923.50 3,923.50 604-13662 Inlet Type 13 (5 Foot)(Sweeper)(2 Unit) 1 Each 3,923.50 3,923.50 604-13663 Inlet Type 13 (5 Foot)(Sweeper)(3 Unit) 1 Each 3,923.50 3,923.50 604-13672 Inlet Type 13 (10 Foot)(Sweeper)(2 Unit) 1 Each 4,468.50 4,468.50 604-13673 Inlet Type 13 (10 Foot)(Sweeper)(3 Unit) 1 Each 4,468.50 4,468.50 Colorado Department of Transportation 13:46 Tuesday, March 18, 2008 17 2007 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/07 THROUGH 12/31/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 604-13674 Inlet Type 13 (10 Foot)(Sweeper)(4 Unit) 2 Each 10,027.00 5,013.50 604-13675 Inlet Type 13 (10 Foot)(Sweeper)(5 Unit) 2 Each 11,663.00 5,831.50 604-13676 Inlet Type 13 (10 Foot)(Sweeper)(6 Unit) 1 Each 7,448.50 7,448.50 604-13681 Inlet Type 13 (10 Foot)(Special)(1 Unit) 1 Each 7,448.50 7,448.50 604-16005 Inlet Type 16 (5 Foot) 2 Each 7,200.00 3,600.00 604-16010 Inlet Type 16 (10 Foot) 1 Each 5,200.00 5,200.00 604-16505 Inlet Type 16 (Double) (5 Foot) 9 Each 52,800.00 5,866.67 604-16605 Inlet Type 16 (Triple) (5 Foot) 2 Each 21,400.00 10,700.00 604-16610 Inlet Type 16 (Triple) (10 Foot) 2 Each 22,600.00 11,300.00 604-19000 Inlet Special 2 Each 7,400.00 3,700.00 604-19105 Inlet Type R L 5 (5 Foot) 35 Each 179,967.40 5,141.93 604-19110 Inlet Type R L 5 (10 Foot) 24 Each 159,220.65 6,634.19 604-19205 Inlet Type R L 10 (5 Foot) 16 Each 70,218.03 4,388.63 604-19210 Inlet Type R L 10 (10 Foot) 12 Each 65,000.00 5,416.67 604-19305 Inlet Type R L 15 (5 Foot) 16 Each 52,727.36 3,295.46 604-19310 Inlet Type R L 15 (10 Foot) 3 Each 21,912.22 7,304.07 604-19405 Inlet Type R Special (5 Foot) 3 Each 16,494.49 5,498.16 604-19410 Inlet Type R Special (10 Foot) 8 Each 65,493.36 8,186.67 604-20000 Outlet Structure 6 Each 77,941.51 12,990.25 604-25000 Vane Grate Inlet Special 14 Each 123,743.04 8,838.79 604-25005 Vane Grate Inlet (5 Foot) 1 Each 7,553.50 7,553.50 604-25006 Vane Grate Inlet Special (5 Foot) 10 Each 33,953.20 3,395.32 604-26005 Vane Grate Inlet (Double) (5 Foot) 6 Each 23,400.00 3,900.00 604-30000 Manhole Slab Base (Special) 1 Each 2,200.00 2,200.00 604-30005 Manhole Slab Base (5 Foot) 11 Each 38,829.70 3,529.97 604-30010 Manhole Slab Base (10 Foot) 42 Each 181,601.85 4,323.85 604-30015 Manhole Slab Base (15 Foot) 8 Each 41,619.00 5,202.38 604-31005 Manhole Box Base (5 Foot) 2 Each 17,841.50 8,920.75 604-31010 Manhole Box Base (10 Foot) 10 Each 116,696.06 11,669.61 604-31015 Manhole Box Base (15 Foot) 3 Each 49,434.00 16,478.00 604-31020 Manhole Box Base (20 Foot) 2 Each 36,663.00 18,331.50 604-39000 Manhole Special 2 Each 38,904.00 19,452.00 604-39005 Manhole Special (5 Foot) 1 Each 5,700.00 5,700.00 604-39010 Manhole Special (10 Foot) 1 Each 15,529.00 15,529.00 604-39015 Manhole Special (15 Foot) 1 Each 28,886.00 28,886.00 604-39020 Manhole Special (20 Foot) 2 Each 36,663.00 18,331.50 604-39025 Manhole Special (25 Foot) 1 Each 19,452.00 19,452.00 604-39050 Manhole (Traffic Management System) 3 Each 22,205.43 7,401.81 Colorado Department of Transportation 13:46 Tuesday, March 18, 2008 18 2007 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/07 THROUGH 12/31/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 604-50003 Inlet Grating and Frame Type C 12 Each 6,525.24 543.77 604-50200 Manhole Ring and Cover 25 Each 109,698.40 4,387.94 605-00040 4 Inch Perforated Pipe Underdrain 36 Lin Foot 2,700.00 75.00 605-00060 6 Inch Perforated Pipe Underdrain 30 Lin Foot 1,800.00 60.00 605-00120 12 Inch Perforated Pipe Underdrain 260 Lin Foot 15,600.00 60.00 605-82100 Pipe Edge Drain 34,600 Lin Foot 337,043.00 9.74 605-83002 Geocomposite Drain with Pipe 181 Sq Yard 3,620.00 20.00 605-84000 Subsurface Drain Outlet 1,713 Lin Foot 38,340.00 22.38 606-00301 Guardrail Type 3 (6-3 Post Spacing) 122,317 Lin Foot 2,000,760.71 16.36 606-00350 Guardrail Type 3 (Double) (6-3 Post Spacing) 36,373 Lin Foot 782,890.90 21.52 606-00705 Guardrail Type 7 (Special) 60 Lin Foot 10,382.00 173.03 606-00710 Guardrail Type 7 (Style CA) 12,177 Lin Foot 777,486.10 63.85 606-00715 Guardrail Type 7 (Style CA)(Concrete Glare Screen) 3,434 Lin Foot 288,456.00 84.00 606-00716 Guardrail Type 7 (Style CA) (Special) 159 Lin Foot 27,825.00 175.00 606-00720 Guardrail Type 7 (Style CC) 312 Lin Foot 20,592.00 66.00 606-00730 Guardrail Type 7 (Style CD) 4,672 Lin Foot 397,260.00 85.03 606-00740 Guardrail Type 7 (Style CE) 20 Lin Foot 13,000.00 650.00 606-01320 End Anchorage Type 3B 2 Each 1,953.41 976.71 606-01340 End Anchorage Type 3D 50 Each 36,592.22 731.84 606-01370 Transition Type 3G 149 Each 177,680.54 1,192.49 606-01380 Transition Type 3H 22 Each 14,575.40 662.52 606-01385 Transition Type 3J 20 Each 15,590.41 779.52 606-01390 End Anchorage Type 3K 21 Each 24,148.36 1,149.92 606-01395 Transition Type 3L 23 Each 14,985.60 651.55 606-01460 Median Terminal 29 Each 111,997.38 3,861.98 606-02003 End Anchorage (Nonflared) 212 Each 438,450.10 2,068.16 606-02005 End Anchorage (Flared) 201 Each 309,718.32 1,540.89 606-10300 Bridge Rail Type 3 174 Lin Foot 28,078.40 161.37 606-10305 Bridge Rail Type 3 (Special) 360 Lin Foot 14,040.00 39.00 606-10350 Bridge Rail Type 3R 845 Lin Foot 98,535.50 116.61 606-10700 Bridge Rail Type 7 3,598 Lin Foot 301,118.66 83.69 606-10705 Bridge Rail Type 7 (Special) 5,972 Lin Foot 612,090.50 102.49 606-11010 Bridge Rail Type 10R 5,132 Lin Foot 521,807.40 101.68 606-11030 Bridge Rail Type 10M 3,354 Lin Foot 355,816.60 106.09 606-11032 Bridge Rail Type 10M (Special) 2,198 Lin Foot 346,067.88 157.45 606-20010 Tensioned Cable Barrier 38,680 Lin Foot 406,249.80 10.50 606-21010 End Anchorage (Tensioned Cable Barrier) 38 Each 87,928.42 2,313.91 607-00000 Line Post 86 Each 6,628.00 77.07 Colorado Department of Transportation 13:46 Tuesday, March 18, 2008 19 2007 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/07 THROUGH 12/31/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 607-00005 End Post 202 Each 29,666.88 146.87 607-00010 Corner and Line Brace Post 681 Each 148,195.00 217.61 607-00015 End Post (Special) 4 Each 2,200.00 550.00 607-00020 Corner and Line Brace Post (Special) 10 Each 8,800.00 880.00 607-01000 Fence Barbed Wire with Metal Posts 189,287 Lin Foot 188,198.45 0.99 607-01010 Fence Barbed Wire with Metal Posts (Special) 445 Lin Foot 1,610.90 3.62 607-01050 Fence Wire With Metal Posts 654 Lin Foot 1,144.50 1.75 607-01100 Fence Barbed Wire With Treated Wooden Posts 1,656 Lin Foot 5,001.30 3.02 607-11200 Fence Combination Wire With Metal Posts 685 Lin Foot 2,740.00 4.00 607-11350 Fence Deer 110,392 Lin Foot 688,195.92 6.23 607-11525 Fence (Plastic) 29,582 Lin Foot 92,507.28 3.13 607-11575 Rock Fall Fence 120 Lin Foot 132,664.80 1,105.54 607-11580 Fence (Temporary) 11,655 Lin Foot 40,392.95 3.47 607-13000 Fence Masonry (Sound Barrier) 3,300 Sq Foot 107,250.00 32.50 607-15000 Fence Concrete (Sound Barrier) 3,016 Sq Foot 312,156.00 103.50 607-21300 Fence Barrier With Metal Posts 600 Lin Foot 2,400.00 4.00 607-32000 Fence Picket Snow 360 Lin Foot 2,340.00 6.50 607-52900 Line Post (Chain Link) 214 Each 11,342.00 53.00 607-52905 End Post (Chain Link) 14 Each 2,126.20 151.87 607-52910 Corner and Line Brace Post (Chain Link) 5 Each 790.00 158.00 607-53005 Fence Chain Link (Special) 275 Lin Foot 6,000.50 21.82 607-53137 Fence Chain Link (Special) (36 Inch) 1,257 Lin Foot 38,610.00 30.72 607-53142 Fence Chain Link (42 Inch) 710 Lin Foot 4,260.00 6.00 607-53160 Fence Chain Link (60 Inch) 451 Lin Foot 9,736.64 21.59 607-53161 Fence Chain Link (Special) (60 Inch) 637 Lin Foot 19,270.00 30.25 607-53172 Fence Chain Link (72 Inch) 2,928 Lin Foot 34,776.50 11.88 607-53178 Fence Chain Link (Spec) (78 In) 1,514 Lin Foot 48,560.00 32.07 607-53191 Fence Chain Link (Special) (92 Inch) 700 Lin Foot 62,083.00 88.69 607-53203 Fence Chain Link (Special)(102 Inch) 50 Lin Foot 3,562.50 71.25 607-55030 Mesh Post 6 Each 61,272.48 10,212.08 607-55031 Mesh Post (Special) 4 Each 43,780.32 10,945.08 607-55050 Mesh Anchor (Special) 100 Each 134,882.00 1,348.82 607-55100 Wire Mesh 102,000 Sq Foot 132,600.00 1.30 607-55101 Cable Net 74,748 Sq Foot 666,681.20 8.92 607-60001 Pedestrian Gate (Special) 2 Each 990.00 495.00 607-60002 Game Ramp 70 Each 385,000.00 5,500.00 607-60110 10 Foot Gate 5 Each 2,300.00 460.00 607-60112 12 Foot Gate 4 Each 1,400.00 350.00 Colorado Department of Transportation 13:46 Tuesday, March 18, 2008 20 2007 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/07 THROUGH 12/31/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 607-60114 14 Foot Gate 1 Each 232.18 232.18 607-60116 16 Foot Gate 10 Each 7,470.00 747.00 607-60120 20 Foot Gate 8 Each 1,707.00 213.38 607-60203 3 Ft Gate Single (Chain Link) 4 Each 900.00 225.00 607-60270 20 Foot Gate Double (Chain Link) 1 Each 674.57 674.57 607-60274 24 Foot Gate Double (Chain Link) 2 Each 2,410.00 1,205.00 607-60316 16 Foot Gate Twin 2 Each 780.00 390.00 607-60420 20 Foot Gate Twin (Special) 2 Each 2,046.40 1,023.20 607-60424 24 Foot Gate Twin (Special) 1 Each 880.00 880.00 607-60620 Road Closure Gate 2 Each 21,060.00 10,530.00 608-00000 Concrete Sidewalk 16,804 Sq Yard 578,133.90 34.40 608-00003 Concrete Sidewalk (Fast Track) 7 Sq Yard 294.00 42.00 608-00006 Concrete Sidewalk (6 Inch) 4,394 Sq Yard 222,444.75 50.62 608-00010 Concrete Curb Ramp 6,460 Sq Yard 726,970.60 112.53 608-00011 Curb Ramp (Fast Track) 435 Sq Yard 74,309.50 170.83 608-00012 Curb Ramp (Special) 26 Sq Yard 2,626.00 101.00 608-00015 Truncated Domes 2,421 Sq Foot 140,781.70 58.15 608-00020 Concrete Bikeway 867 Sq Yard 54,187.50 62.50 608-00051 Brick Pavers (Install Only) 64 Sq Foot 1,344.00 21.00 608-00350 Concrete Sidewalk (Colored) 1,055 Sq Yard 64,302.25 60.95 608-01550 Place Asphalt Millings 690 Sq Yard 6,927.60 10.04 608-10010 Sidewalk Drain 4 Each 9,200.00 2,300.00 609-20010 Curb Type 2 (Section B) 133 Lin Foot 3,558.80 26.76 609-21010 Curb and Gutter Type 2 (Section I-B) 25,330 Lin Foot 464,275.02 18.33 609-21011 Curb and Gutter Type 2 (Section I-M) 10,422 Lin Foot 147,557.58 14.16 609-21013 Curb and Gutter Type 2 (Section I-M) (Special) 43 Lin Foot 1,505.00 35.00 609-21020 Curb and Gutter Type 2 (Section II-B) 84,442 Lin Foot 1,439,611.00 17.05 609-21021 Curb and Gutter Type 2 (Section II-M) 160 Lin Foot 4,000.00 25.00 609-23000 Gutter (Special) 55 Lin Foot 3,025.00 55.00 609-24000 Gutter Type 2 Special 360 Lin Foot 29,462.40 81.84 609-24002 Gutter Type 2 (2 Foot) 1,142 Lin Foot 23,619.50 20.68 609-24003 Gutter Type 2 (3 Foot) 104 Lin Foot 3,800.00 36.54 609-24004 Gutter Type 2 (4 Foot) 279 Lin Foot 6,623.00 23.74 609-24006 Gutter Type 2 (6 Foot) 250 Lin Foot 11,828.50 47.31 609-24008 Gutter Type 2 (8 Foot) 647 Lin Foot 21,955.75 33.93 609-31010 Curb and Gutter Type 2 (Section I-B) (Fast Track) 744 Lin Foot 13,465.20 18.10 609-31020 Curb and Gutter Type 2 (Section II-B) (Fast Track) 733 Lin Foot 14,604.85 19.92 609-34006 Gutter Type 2 (6 Foot) (Fast Track) 40 Lin Foot 1,600.00 40.00 Colorado Department of Transportation 13:46 Tuesday, March 18, 2008 21 2007 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/07 THROUGH 12/31/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 609-40010 Curb Type 4 (Section B) 17 Lin Foot 920.00 54.12 609-40011 Curb Type 4 (Section M) 1,511 Lin Foot 30,220.00 20.00 609-60011 Curb Type 6 (Section M) 23,544 Lin Foot 182,753.00 7.76 610-00010 Median Cover Material (Decorative) 4,135 Sq Foot 20,675.00 5.00 610-00020 Median Cover Material (Patterned Concrete) 31,336 Sq Foot 200,315.66 6.39 610-00024 Median Cover Material (4 Inch Patterned Concrete) 97,080 Sq Foot 522,988.46 5.39 610-00026 Median Cover Material (6 Inch Patterned Concrete) 270 Sq Foot 5,940.00 22.00 610-00030 Median Cover Material (Concrete) 43,663 Sq Foot 242,397.60 5.55 610-00100 Median Edging (Patterned Concrete) 3,400 Lin Foot 105,060.00 30.90 611-00027 26 Foot Deer Guard 2 Each 36,600.00 18,300.00 612-00001 Delineator (Type I) 6,075 Each 104,818.48 17.25 612-00002 Delineator (Type II) 921 Each 18,394.48 19.97 612-00003 Delineator (Type III) 1,397 Each 26,023.66 18.63 612-00010 Delineator (Special) 4 Each 72.00 18.00 612-00022 Delineator (Type II) (Barrier) 20 Each 1,180.00 59.00 612-00031 Delineator (Type I) (Extra Height) 196 Each 8,539.20 43.57 612-00032 Delineator (Type II) (Extra Height) 100 Each 4,900.00 49.00 612-00033 Delineator (Type III) (Extra Height) 7 Each 382.55 54.65 612-00041 Delineator (Flexible) (Type I) 883 Each 37,707.20 42.70 612-00042 Delineator (Flexible) (Type II) 177 Each 7,632.70 43.12 612-00043 Delineator (Flexible) (Type III) 81 Each 3,537.44 43.67 612-00046 Delineator (Flexible) (Special) (Type I) 86 Each 4,919.20 57.20 612-00048 Delineator (Flexible) (Special (Type III) 36 Each 2,278.80 63.30 612-00070 Reflector Strip (4 Inch) 1,168 Each 32,272.00 27.63 612-00075 Reflector Strip (6 Inch) 7,368 Each 147,360.00 20.00 612-00270 Location Marker (Utility)(Flat Slat) 10 Each 1,540.00 154.00 612-00300 Steel Guard Post 4 Each 2,600.00 650.00 612-15000 Install Marker 88 Each 19,360.00 220.00 613-00001 Directional Boring Conduit 720 Lin Foot 10,080.00 14.00 613-00075 3/4 Inch Electrical Conduit 710 Lin Foot 4,210.00 5.93 613-00100 1 Inch Electrical Conduit 3,765 Lin Foot 21,282.39 5.65 613-00125 1-1/4 Inch Electrical Conduit 220 Lin Foot 3,294.50 14.98 613-00150 1-1/2 Inch Electrical Conduit 3,183 Lin Foot 32,546.10 10.22 613-00200 2 Inch Electrical Conduit 32,041 Lin Foot 298,131.28 9.30 613-00201 2 Inch Electrical Conduit (Jacked) 3,077 Lin Foot 49,728.75 16.16 613-00206 2 Inch Electrical Conduit (Bored) 32,202 Lin Foot 563,360.95 17.49 613-00300 3 Inch Electrical Conduit 15,014 Lin Foot 237,309.40 15.81 613-00301 3 Inch Electrical Conduit (Jacked) 5,613 Lin Foot 88,645.40 15.79 Colorado Department of Transportation 13:46 Tuesday, March 18, 2008 22 2007 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/07 THROUGH 12/31/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 613-00306 3 Inch Electrical Conduit (Bored) 11,148 Lin Foot 321,237.40 28.82 613-00350 3-1/2 Inch Electrical Conduit 3,720 Lin Foot 48,508.80 13.04 613-00400 4 Inch Electrical Conduit 18,651 Lin Foot 322,631.94 17.30 613-00401 4 Inch Electrical Conduit (Jacked) 240 Lin Foot 6,696.00 27.90 613-00402 4 Inch Electrical Conduit (Install Only) 4,988 Lin Foot 64,333.20 12.90 613-00408 4 Inch Electrical Conduit (Bored) 210 Lin Foot 14,385.00 68.50 613-00600 6 Inch Electrical Conduit 1,110 Lin Foot 36,707.70 33.07 613-01075 3/4 Inch Electrical Conduit (Plastic) 75 Lin Foot 450.00 6.00 613-01100 1 Inch Electrical Conduit (Plastic) 800 Lin Foot 14,080.00 17.60 613-01125 1-1/4 Inch Electrical Conduit (Plastic) 22,220 Lin Foot 266,860.00 12.01 613-01150 1-1/2 Inch Electrical Conduit (Plastic) 25 Lin Foot 725.00 29.00 613-01200 2 Inch Electrical Conduit (Plastic) 151,509 Lin Foot 1,450,987.20 9.58 613-01201 2 Inch Electrical Conduit (Plastic) (Special) 120 Lin Foot 4,680.00 39.00 613-01250 2-1/2 Inch Electrical Conduit (Plastic) 1,610 Lin Foot 26,167.25 16.25 613-01300 3 Inch Electrical Conduit (Plastic) 48,942 Lin Foot 820,781.50 16.77 613-01400 4 Inch Electrical Conduit (Plastic) 2,178 Lin Foot 35,460.00 16.28 613-01800 8 Inch Electrical Conduit (Plastic) 1,048 Lin Foot 10,480.00 10.00 613-04020 Hanger System 1 Lump Sum 87,691.50 87,691.50 613-05000 Direct-Burial Cable 8,700 Lin Foot 65,598.00 7.54 613-05001 Direct Burial Cable (Install Only) 12,486 Lin Foot 84,904.80 6.80 613-07000 Pull Box (Special) 68 Each 43,027.00 632.75 613-07017 Pull Box (16"x14"x6") 2 Each 700.00 350.00 613-07018 Pull Box (18"x12"x8") 24 Each 13,824.00 576.00 613-07023 Pull Box (24"x36"x24") 46 Each 35,510.00 771.96 613-07026 Pull Box (16"x24"x12") 17 Each 11,680.60 687.09 613-07034 Pull Box (24"x36"x18") 146 Each 146,834.37 1,005.71 613-07038 Pull Box (36"x48"x18") 4 Each 7,400.00 1,850.00 613-07040 Pull Box (30"x48"x24") 1 Each 1,040.00 1,040.00 613-07050 Pull Box (13"x24"x18") Deep 105 Each 82,500.00 785.71 613-07060 Pull Box (18"x30"x18") Deep 6 Each 5,796.00 966.00 613-07192 Pull Box (36"x12"x12") 10 Each 10,400.00 1,040.00 613-10000 Wiring 31 Lump Sum 822,374.44 26,528.21 613-10010 Wiring (Special) 5 Lump Sum 79,741.00 15,948.20 613-15100 Recessed Light 22 Each 50,886.00 2,313.00 613-16000 Luminaire (Special) 25 Each 24,433.18 977.33 613-16010 Light Standard and Luminaire (Decorative) 64 Each 471,264.00 7,363.50 613-16020 Luminaire (Special) Induction (165 Watt) 1 Each 1,600.00 1,600.00 613-16025 Luminaire (Special) (LED) (Step Light) 30 Each 17,100.00 570.00 Colorado Department of Transportation 13:46 Tuesday, March 18, 2008 23 2007 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/07 THROUGH 12/31/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 613-30005 Light Standard and Luminaire (Pedestrian) 17 Each 39,240.00 2,308.24 613-30400 Light Standard Aluminum (40 Foot) 6 Each 16,800.00 2,800.00 613-32250 Light Standard Steel (25 Foot) 12 Each 57,972.00 4,831.00 613-32350 Light Standard Steel (35 Foot) 6 Each 12,750.00 2,125.00 613-32400 Light Standard Steel (40 Foot) 20 Each 89,985.20 4,499.26 613-34250 Light Standard Metal (25 Foot) 9 Each 34,359.02 3,817.67 613-34300 Light Standard Metal (30 Foot) 6 Each 19,940.00 3,323.33 613-34350 Light Standard Metal (35 Foot) 26 Each 106,076.36 4,079.86 613-34400 Light Standard Metal (40 Foot) 4 Each 14,000.00 3,500.00 613-40000 Concrete Foundation Pad 38 Each 34,280.74 902.12 613-40010 Light Standard Foundation 96 Each 106,193.86 1,106.19 613-40012 Light Standard Foundation Special 17 Each 13,095.00 770.29 613-50060 Portable Power Generator 2 Each 5,400.00 2,700.00 613-50100 Lighting Control Center 12 Each 69,217.50 5,768.13 613-50210 Temporary Lighting 1 Lump Sum 64,155.05 64,155.05 613-50225 Interior Lighting (Concrete Box Girder) 142 Each 73,343.00 516.50 613-50365 Transformer Base 24 Each 16,238.88 676.62 613-50375 Solar Collection System 1 Each 5,430.00 5,430.00 613-50410 Light Standard (Temporary) 11 Each 46,010.60 4,182.78 613-70150 Luminaire High Pressure Sodium (150 Watt) 26 Each 25,451.64 978.91 613-70250 Luminaire High Pressure Sodium (250 Watt) 98 Each 42,293.92 431.57 613-70400 Luminaire High Pressure Sodium (400 Watt) 79 Each 37,190.00 470.76 613-75100 Luminaire Metal Halide (100 Watt) 4 Each 8,120.00 2,030.00 613-76100 Luminaire Metal Halide (Wall Type) (100 Watt) 26 Each 33,540.00 1,290.00 613-81600 480V Switchgear 2 Each 1,667,500.00 833,750.00 613-81608 1350 Ampere Bus Duct 120 Lin Foot 95,400.00 795.00 613-81610 3000 Ampere Bus Duct 352 Lin Foot 343,200.00 975.00 613-81611 3000 Ampere Bus Duct (Temporary) 60 Lin Foot 42,600.00 710.00 614-00011 Sign Panel (Class I) 6,855 Sq Foot 118,206.06 17.24 614-00012 Sign Panel (Class II) 5,240 Sq Foot 105,826.14 20.20 614-00013 Sign Panel (Class III) 3,720 Sq Foot 78,446.96 21.09 614-00028 Sign Panel (Class III) (Install Only) 3,362 Sq Foot 26,896.00 8.00 614-00029 Sign Panel (Class II) (Install Only) 6 Each 402.00 67.00 614-00035 Sign Panel (Special) 24 Sq Foot 1,200.00 50.00 614-00042 Sign Post (Install Only) 72 Lin Foot 936.00 13.00 614-00066 Timber Sign Post 6x6 Inch 18 Lin Foot 486.00 27.00 614-00200 Steel Sign Post (U-2) 177 Lin Foot 1,897.50 10.72 614-00214 Steel Sign Post (1.75x1.75 Inch Tubing) 148 Lin Foot 2,812.00 19.00 Colorado Department of Transportation 13:46 Tuesday, March 18, 2008 24 2007 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/07 THROUGH 12/31/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 614-00220 Steel Sign Post (2.5x2.5 Inch Tubing) 20 Lin Foot 320.00 16.00 614-00612 Steel Sign Post (W 6x12) 404 Lin Foot 15,410.44 38.14 614-00615 Steel Sign Post (W 6x15) 469 Lin Foot 19,367.33 41.29 614-00818 Steel Sign Post (W 8x18) 72 Lin Foot 3,220.09 44.72 614-01022 Steel Sign Post (W 10x22) 175 Lin Foot 10,154.00 58.02 614-01502 Steel Sign Support (2-Inch Round)(Post & Socket) 1,095 Lin Foot 16,268.20 14.86 614-01503 Steel Sign Support (2-Inch Round)(Post and Socket) 244 Each 33,355.19 136.70 614-01512 Steel Sign Support (2-Inch Round)(Post) 3,132 Lin Foot 27,104.93 8.65 614-01522 Steel Sign Support (2-Inch Round)(Socket) 138 Each 11,904.05 86.26 614-01572 Steel Sign Support (2-1/2 Inch Round NP-40)(Post & Sl 114 Lin Foot 2,738.28 24.02 614-01575 Steel Sign Support (2-1/2 Inch Round NP-40)(Post) 579 Lin Foot 13,207.62 22.81 614-01578 Steel Sign Support (2-1/2 Inch Round NP-40)(Slipbase) 33 Each 7,703.00 233.42 614-01582 Steel Sign Support (2-1/2 Inch Round)(Post and Slipba 1,151 Lin Foot 54,110.00 47.01 614-01583 Steel Sign Support (2-1/2 Inch Round)(Post & Slipbase 245 Each 96,441.54 393.64 614-01585 Steel Sign Support (2-1/2 Inch Round Sch 80)(Post) 2,110 Lin Foot 62,677.97 29.71 614-01588 Steel Sign Support (2-1/2 Inch Round Sch 80)(Slipbase 254 Each 57,682.28 227.10 614-03001 Concrete Footing (Type 1) 34 Each 30,955.68 910.46 614-03002 Concrete Footing (Type 2) 34 Each 44,521.32 1,309.45 614-03003 Concrete Footing (Type 3) 6 Each 37,366.72 6,227.79 614-03005 Concrete Footing (Type 5) 10 Each 17,900.00 1,790.00 614-10050 Modification of Overhead Sign Structure 6 Each 1,740.00 290.00 614-10123 Variable Message Sign (Install Only) 28 Each 300,291.20 10,724.69 614-10125 Variable Message Sign (Ground Mounted) 1 Each 99,400.00 99,400.00 614-10128 Blankout Sign (Fiber Optic) 12 Each 187,080.00 15,590.00 614-10129 Blankout Sign (Fiber Optic) (Variable Speed Limit) 2 Each 27,670.00 13,835.00 614-10130 Illuminated Sign 4 Each 16,000.00 4,000.00 614-10145 Variable Message Sign LED (Single Faced) 12 Each 200,000.00 16,666.67 614-10146 Variable Message Sign (LED) (Ground Mounted) 2 Each 173,532.74 86,766.37 614-10147 Variable Message Sign LED (Overhead) 6 Each 695,571.24 115,928.54 614-10160 Signal Head Backplates 5 Each 875.00 175.00 614-10320 System Intergration and Testing 1 Lump Sum 115,200.00 115,200.00 614-30110 Butterfly Structure 3 Each 65,798.58 21,932.86 614-30205 VMS Butterfly Support (Roadside) 1 Each 22,880.00 22,880.00 614-31800 Monotube Overhead Sign Cantilever (18 Inch Diameter) 4 Each 111,800.00 27,950.00 614-32000 Monotube Overhead Sign Cantilever (20 Inch Diameter) 3 Each 88,413.69 29,471.23 614-32400 Monotube Overhead Sign Cantilever (24 Inch Diameter) 33 Each 1,289,243.21 39,067.98 614-32900 Monotube Overhead Sign Cantilever (Install Only) 18 Each 115,650.00 6,425.00 614-42500 Monotube Overhead Sign Bridge (Install Only) 2 Each 25,500.00 12,750.00 Colorado Department of Transportation 13:46 Tuesday, March 18, 2008 25 2007 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/07 THROUGH 12/31/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 614-70117 Pedestrian Signal Face (16) 104 Each 62,019.08 596.34 614-70150 Pedestrian Signal Face (16) (Countdown) 29 Each 16,556.00 570.90 614-70336 Traffic Signal Face (12-12-12) 433 Each 337,868.00 780.30 614-70560 Traffic Signal Face (12-12-12-12-12) 45 Each 50,991.20 1,133.14 614-72745 Blank Out Sign Mounting Support & Wiring 12 Each 4,380.00 365.00 614-72830 Communications Cabinet 7 Each 38,211.35 5,458.76 614-72855 Traffic Signal Controller Cabinet 9 Each 197,469.26 21,941.03 614-72858 Pedestal Pole (3 Foot 6 Inch) 4 Each 4,650.00 1,162.50 614-72860 Pedestrian Push Button 109 Each 21,911.64 201.02 614-72864 Fire Preemption Unit 21 Each 47,628.00 2,268.00 614-72866 Fire Preemption Unit and Timer 10 Each 24,202.00 2,420.20 614-72871 Loop Detector Wire (Prefab) Special 8,742 Lin Foot 140,653.64 16.09 614-72872 Loop Detector (Micro Type) 26 Each 10,270.00 395.00 614-72875 Loop Detector Wire 38,252 Lin Foot 90,056.50 2.35 614-72876 Traffic Signal Vehicle Detector Amplifier (Loop Type) 3 Each 2,700.00 900.00 614-72878 Traffic Signal Vehicle Detector Amplifier (Loop Type) 22 Each 13,910.00 632.27 614-72882 Traffic Signal Vehicle Detector (Micro Type) 6 Each 2,100.00 350.00 614-72886 Intersection Detection System (Camera) 38 Each 229,540.00 6,040.53 614-72887 Microwave Vehicle Radar Detector 15 Each 153,243.00 10,216.20 614-72889 Traffic Signal Vehicle Detector (Micro Type) (Non-Inv 38 Each 25,402.00 668.47 614-72890 Span Wire Cable 795 Lin Foot 6,299.95 7.92 614-72893 Signal Cable 5,965 Lin Foot 37,916.25 6.36 614-72896 Intersection Detection System (Camera)(Install Only) 17 Each 11,700.00 688.24 614-73005 Piezo Electric Tube, Class 2 2 Each 13,530.00 6,765.00 614-75216 Pedestrian Signal Face (16) (Install Only) 8 Each 1,560.00 195.00 614-75336 Traffic Signal Face (12-12-12) (Install Only) 14 Each 2,940.00 210.00 614-75848 Traffic Signal Controller and Cabinet (Install Only) 7 Each 16,659.30 2,379.90 614-75855 Traffic Signal Controller Cabinet (Install Only) 22 Each 35,472.80 1,612.40 614-80000 Flashing Beacon 40 Each 69,190.00 1,729.75 614-80001 Flashing Beacon (Solar Powered) 11 Each 57,435.00 5,221.36 614-80312 Barricade (Type 3 F-B) 1 Each 1,500.00 1,500.00 614-80313 Barricade (Type 3 F-C) 1 Each 800.00 800.00 614-80321 Barricade (Type 3 M-A) 6 Each 240.00 40.00 614-80385 Rumble Strip 264,008 Lin Foot 85,027.61 0.32 614-80387 Rumble Strip (Grinding) 315,493 Lin Foot 65,761.88 0.21 614-80391 Rumble Strip (Grinding)(Asphalt) 203,725 Lin Foot 34,039.66 0.17 614-81000 Traffic Signal-Light Pole Steel 9 Each 69,012.00 7,668.00 614-81010 Traffic Signal-Light Pole Steel (1 Mast Arm) 19 Each 268,812.00 14,148.00 Colorado Department of Transportation 13:46 Tuesday, March 18, 2008 26 2007 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/07 THROUGH 12/31/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 614-81020 Traffic Signal-Light Pole Steel (2 Mast Arm) 4 Each 88,513.00 22,128.25 614-81120 Traffic Signal-Light Pole Steel (1-20 Foot Mast Arm) 1 Each 12,050.00 12,050.00 614-81125 Traffic Signal-Light Pole Steel (1-25 Foot Mast Arm) 2 Each 26,167.00 13,083.50 614-81130 Traffic Signal-Light Pole Steel (1-30 Foot Mast Arm) 6 Each 92,315.00 15,385.83 614-81135 Traffic Signal-Light Pole Steel (1-35 Foot Mast Arm) 4 Each 65,649.57 16,412.39 614-81140 Traffic Signal-Light Pole Steel (1-40 Foot Mast Arm) 8 Each 146,968.63 18,371.08 614-81145 Traffic Signal-Light Pole Steel (1-45 Foot Mast Arm) 12 Each 222,375.58 18,531.30 614-81150 Traffic Signal-Light Pole Steel (1-50 Foot Mast Arm) 12 Each 231,985.54 19,332.13 614-81155 Traffic Signal-Light Pole Steel (1-55 Foot Mast Arm) 8 Each 151,975.00 18,996.88 614-81160 Traffic Signal Light Pole Steel (1-60 Mast Arm Foot) 3 Each 71,190.00 23,730.00 614-81165 Traffic Signal-Light Pole Steel (1-65 Foot Mast Arm) 3 Each 87,480.00 29,160.00 614-81170 Traffic Signal-Light Pole Steel (1-70 Foot Mast Arm) 4 Each 87,540.00 21,885.00 614-81175 Traffic Signal-Light Pole Steel (1-75 Foot Mast Arm) 4 Each 120,758.00 30,189.50 614-81240 Traffic Signal-Light Pole Steel (2-40 Foot Mast Arm) 2 Each 62,413.00 31,206.50 614-81300 Traffic Signal-Light Pole (Install Only) 2 Each 5,000.00 2,500.00 614-84000 Traffic Signal Pedestal Pole Steel 5 Each 4,874.00 974.80 614-84100 Traffic Signal Pedestal Pole Aluminum 2 Each 2,040.00 1,020.00 614-85005 Impact Attenuator (Sand Filled Plastic Barrel) 4 Each 19,200.00 4,800.00 614-85045 Truck with Mounted Attenuator and Flashing Arrow Pane 1 Each 9,555.00 9,555.00 614-85115 Impact Attenuator (Quadguard) 2 Each 58,200.00 29,100.00 614-85362 Traffic Signal-Light Span Wire Pole (12 Inch) 14 Each 90,648.00 6,474.86 614-85366 Traffic Signal-Light Span Wire Pole (16 Inch) 4 Each 38,968.00 9,742.00 614-86000 Traffic Signal Controller (Master) 1 Each 2,640.60 2,640.60 614-86002 Spread Spectrum Radio 13 Each 37,955.60 2,919.66 614-86005 Telemetry (Master) 1 Lump Sum 2,203.20 2,203.20 614-86006 Telemetry (Master) 30 Each 413,518.00 13,783.93 614-86101 Wireless Mesh Router 22 Each 217,140.00 9,870.00 614-86102 Wireless Device Router 13 Each 115,544.00 8,888.00 614-86103 Wireless Router Controller 1 Each 17,600.00 17,600.00 614-86105 Telemetry (Field) 32 Each 122,342.25 3,823.20 614-86106 Telemetry (Field)(Install Only) 47 Each 24,501.90 521.32 614-86238 Traffic Signal Controller (Solid State) (Full-Actuate 1 Each 19,465.00 19,465.00 614-86240 Traffic Signal Controller (Type 170) 7 Each 27,617.60 3,945.37 614-86245 Controller (Type 170E) 8 Each 86,750.00 10,843.75 614-86246 Controller (Type 170E-HC11) 12 Each 182,853.68 15,237.81 614-86735 Weather Sensor 1 Lump Sum 6,000.00 6,000.00 614-86740 Weather Monitoring System 1 Lump Sum 79,993.33 79,993.33 614-86752 Fold-Over Tower (ITS) 6 Each 111,000.00 18,500.00 Colorado Department of Transportation 13:46 Tuesday, March 18, 2008 27 2007 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/07 THROUGH 12/31/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 614-86756 Anti-Icing System 1 Lump Sum 741,500.00 741,500.00 614-86757 Deicing System 3 Each 1,054,348.14 351,449.38 614-86758 Anti-Icing System 1,823 Sq Yard 294,560.34 161.58 614-86759 Anti-Icing Building 1 Each 96,649.38 96,649.38 614-86800 Uninterrupted Power Supply 6 Each 34,360.76 5,726.79 614-87010 Fiber Optic Cable (Single Mode) (12 Fiber) 23,300 Lin Foot 104,594.50 4.49 614-87020 Optical Transceiver 47 Each 160,890.80 3,423.21 614-87028 Video Optical Transceiver 6 Each 6,600.00 1,100.00 614-87100 Automatic Traffic Recording Station 2 Each 6,354.50 3,177.25 614-87321 Closed Circuit Television (Install Only) 21 Each 23,957.60 1,140.84 614-87325 Closed Circuit Television Pole 8 Each 65,963.58 8,245.45 614-87326 CCTV Pole (Install Only) 12 Each 21,611.60 1,800.97 614-87333 Closed Circuit Television Camera (Traffic Surveillanc 5 Each 41,450.15 8,290.03 614-87335 Video Matrix Switching System (Traffic Surveillance) 2 Each 51,675.70 25,837.85 614-87350 Test Fiber Optic Cable 2 Lump Sum 12,100.00 6,050.00 614-87401 Fiber Optic Cable (Special) 7,300 Lin Foot 15,403.00 2.11 614-87406 Fiber Optic Cable (Single Mode) (6 Strands) 6,160 Lin Foot 40,150.00 6.52 614-87407 Fiber Optic Cable (Multi Mode) (6 Strands) 1,115 Lin Foot 9,477.50 8.50 614-87424 Fiber Optic Cable (Single Mode) (24 Strands) 1,425 Lin Foot 3,918.75 2.75 614-87448 Fiber Optic Cable (Single Mode) (48 Strands) 3,460 Lin Foot 6,574.00 1.90 614-87498 Fiber Optic Cable (Single Mode) (144 Strands) 17,700 Lin Foot 165,200.00 9.33 614-87660 Video Enc/Dec 9 Each 21,768.70 2,418.74 615-00030 Embankment Protector Type 3 39 Each 31,303.00 802.64 615-00050 Embankment Protector Type 5 14 Each 22,242.40 1,588.74 615-00150 Embankment Protector (Special) 16 Each 11,565.00 722.81 616-00180 18 Inch Concrete Siphon Pipe 505 Lin Foot 25,204.55 49.91 616-00240 24 Inch Concrete Siphon Pipe 164 Lin Foot 10,125.36 61.74 616-00300 30 Inch Concrete Siphon Pipe 858 Lin Foot 54,337.14 63.33 616-00360 36 Inch Concrete Siphon Pipe 260 Lin Foot 20,228.00 77.80 616-30018 18 Inch Trash Guard 3 Each 1,134.99 378.33 616-30024 24 Inch Trash Guard 4 Each 3,033.46 758.37 616-30030 30 Inch Trash Guard 5 Each 4,151.70 830.34 616-30036 36 Inch Trash Guard 2 Each 978.36 489.18 617-00012 12 Inch Culvert Pipe 194 Lin Foot 7,540.00 38.87 617-00018 18 Inch Culvert Pipe 169 Lin Foot 15,175.00 89.79 617-00024 24 Inch Culvert Pipe 244 Lin Foot 19,764.00 81.00 617-00030 30 Inch Culvert Pipe 186 Lin Foot 35,712.00 192.00 617-00036 36 Inch Culvert Pipe 36 Lin Foot 7,380.00 205.00 Colorado Department of Transportation 13:46 Tuesday, March 18, 2008 28 2007 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/07 THROUGH 12/31/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 617-00042 42 Inch Culvert Pipe 20 Lin Foot 4,400.00 220.00 617-03000 Detour Culvert Pipe 3 Lump Sum 44,350.00 14,783.33 617-03010 Detour Culvert Pipe 6,273 Lin Foot 298,294.66 47.55 618-00002 Prestressing Steel Wire or Strand 62,039 M Kip Foot 2,780,392.56 44.82 618-00005 Prestressing Steel Bar 240 M Kip Foot 59,660.40 248.59 618-00142 Prestressed Concrete I (BT42) 3,730 Lin Foot 595,531.80 159.66 618-00163 Prestressed Concrete I (BT63) 3,832 Lin Foot 681,812.50 177.93 618-00172 Prestressed Concrete I (BT72) 2,412 Lin Foot 410,040.00 170.00 618-01992 Prestressed Concrete Box (Depth Less Than 32 Inches) 36,358 Sq Foot 1,616,964.00 44.47 618-01994 Prestressed Concrete Box (Depth 32" Through 48") 16,362 Sq Foot 816,300.18 49.89 618-08900 Ground Anchor 360 Lin Foot 32,400.00 90.00 618-09040 Anchor Test 2 Each 20,400.00 10,200.00 618-10200 Precast Concrete U Girder (Precast and Post-Tensioned 2,651 Lin Foot 1,203,607.02 454.02 619-00002 Water Service 3 Each 11,647.50 3,882.50 619-00007 Connect To Existing Waterline 1 Each 5,060.00 5,060.00 619-00010 Water Line (Special) 1 Lump Sum 8,000.00 8,000.00 619-06120 12 Inch Ductile Iron Pipe 318 Lin Foot 47,700.00 150.00 619-06160 16 Inch Ductile Iron Pipe 8 Lin Foot 2,200.00 275.00 619-07080 Place 8 Inch Ductile Iron Pipe 37 Lin Foot 5,901.50 159.50 619-07120 Place 12 Inch Ductile Iron Pipe 42 Lin Foot 7,623.00 181.50 619-10220 22 Inch Welded Steel Pipe 45 Lin Foot 9,000.00 200.00 619-10240 24 Inch Welded Steel Pipe 34 Lin Foot 10,370.00 305.00 619-10360 36 Inch Welded Steel Pipe 56 Lin Foot 20,720.00 370.00 619-10847 84 Inch Welded Steel Pipe (Jacked) 163 Lin Foot 230,941.66 1,416.82 619-30320 4 Inch Galvanized Pipe 450 Lin Foot 39,375.00 87.50 619-30640 8 Inch Galvanized Pipe 170 Lin Foot 16,490.00 97.00 619-50080 1 Inch Plastic Pipe 8,735 Lin Foot 15,961.50 1.83 619-50100 1-1/4 Inch Plastic Pipe 2,270 Lin Foot 3,405.00 1.50 619-50120 1-1/2 Inch Plastic Pipe 190 Lin Foot 950.00 5.00 619-50160 2 Inch Plastic Pipe 550 Lin Foot 1,850.00 3.36 619-50200 2-1/2 Inch Plastic Pipe 490 Lin Foot 1,715.00 3.50 619-50240 3 Inch Plastic Pipe 100 Lin Foot 600.00 6.00 619-50480 6 Inch Plastic Pipe 220 Lin Foot 7,410.00 33.68 619-50640 8 Inch Plastic Pipe 120 Lin Foot 8,760.00 73.00 619-51300 20 Inch Plastic Pipe 400 Lin Foot 30,224.00 75.56 619-71516 2 Inch Air and Vacuum Valve 1 Each 4,000.00 4,000.00 619-75048 6 Inch Gate Valve 1 Each 2,579.00 2,579.00 619-75064 8 Inch Gate Valve 2 Each 5,579.00 2,789.50 Colorado Department of Transportation 13:46 Tuesday, March 18, 2008 29 2007 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/07 THROUGH 12/31/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 619-75096 12 Inch Gate Valve 2 Each 4,400.00 2,200.00 619-76120 12 Inch Butterfly Valve 1 Each 2,860.00 2,860.00 619-76129 16 Inch Butterfly Valve (Install Only) 1 Each 5,170.00 5,170.00 620-00001 Field Office (Class 1) 13 Each 155,803.34 11,984.87 620-00002 Field Office (Class 2) 51 Each 1,022,448.17 20,048.00 620-00005 Field Office (Special) 3 Each 316,211.05 105,403.68 620-00011 Field Laboratory (Class 1) 6 Each 53,041.00 8,840.17 620-00012 Field Laboratory (Class 2) 61 Each 1,087,551.97 17,828.72 620-00015 Field Laboratory (State Furnished) 2 Each 7,100.00 3,550.00 620-00020 Sanitary Facility 136 Each 200,142.17 1,471.63 621-00200 Haul Road 1 Lump Sum 15,019.00 15,019.00 621-00425 Detour 1 Lump Sum 269,000.00 269,000.00 621-00450 Detour Pavement 134,749 Sq Yard 3,272,907.16 24.29 621-00500 Temporary Bridge 1 Lump Sum 430,000.00 430,000.00 621-00650 Pedestrian Stair Structure 1 Lump Sum 12,968.50 12,968.50 622-11010 Maintenance Building 1 Lump Sum 78,700.00 78,700.00 623-00162 Drip Emitter Tubing 9,500 Lin Foot 12,730.00 1.34 623-00164 Drip Emitter 444 Each 888.00 2.00 623-00166 3/4 Inch Emitter Valve Assembly 3 Each 645.00 215.00 623-00168 1 Inch Emitter Valve Assembly 3 Each 1,050.00 350.00 623-00186 3/4 Inch Flush Unit 20 Each 1,220.00 61.00 623-00206 6 Inch Pop-Up Spray Sprinkler 220 Each 6,050.00 27.50 623-01708 1 Inch Backflow Preventer 2 Each 2,132.00 1,066.00 623-03108 1 Inch Automatic Control Valve 35 Each 4,445.00 127.00 623-04000 Control Wire 24 Volt 11,400 Lin Foot 3,420.00 0.30 623-04008 1 Inch Quick-Coupler Valve 11 Each 1,144.00 104.00 623-05010 1-1/4 Inch Gate Valve 6 Each 213.00 35.50 623-05012 1-1/2 Inch Gate Valve 2 Each 270.00 135.00 623-06900 Valve Box 1 Each 1,200.00 1,200.00 623-07500 Soil Moisture Sensor 1 Each 170.00 170.00 623-08106 6 Station Automatic Controller 1 Each 3,500.00 3,500.00 623-08112 12 Station Automatic Controller 1 Each 1,669.00 1,669.00 623-08124 24 Station Automatic Controller 1 Each 3,285.50 3,285.50 623-09900 Sprinkler System 3 Lump Sum 299,190.50 99,730.17 623-09960 Pump System 1 Lump Sum 123,750.00 123,750.00 624-12054 54 Inch Culvert Pipe (CR 2) 480 Lin Foot 72,897.60 151.87 624-14024 24 Inch Culvert Pipe (CR 4) 180 Lin Foot 10,800.00 60.00 625-00000 Construction Surveying 84 Lump Sum 2,837,730.08 33,782.50 Colorado Department of Transportation 13:46 Tuesday, March 18, 2008 30 2007 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/07 THROUGH 12/31/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 625-00001 Construction Surveying (Hourly) 368 Hour 53,583.00 145.61 626-00000 Mobilization 124 Lump Sum 26,742,520.97 215,665.49 626-00010 Erection Equipment 1 Lump Sum 1,100,000.00 1,100,000.00 626-01000 Public Information Services 53 Lump Sum 365,424.69 6,894.81 627-00001 Pavement Marking Paint 14,621 Gallon 501,962.80 34.33 627-00002 Thermoplastic Pavement Marking 1,494 Sq Foot 7,573.10 5.07 627-00003 Thermoplastic Pavement Marking (Inlaid) 2,108 Sq Foot 38,088.60 18.07 627-00005 Epoxy Pavement Marking 26,862 Gallon 2,188,642.17 81.48 627-00011 Pavement Marking Paint (Waterborne) 6,951 Gallon 208,552.30 30.00 627-00012 Pavement Marking Paint (Low VOC Solvent Base) 20,351 Gallon 635,699.75 31.24 627-00025 4 Inch Pavement Marking Tape (Removable) 200 Lin Foot 978.00 4.89 627-00030 Raised Pavement Marker (Temporary) 2,900 Each 6,300.00 2.17 627-01001 Preformed Plastic Pavement Marking (Type I) 24,251 Sq Foot 256,617.45 10.58 627-01003 Preformed Plastic Pavement Marking (Type A) (Inlaid) 34,753 Sq Foot 305,826.40 8.80 627-01010 Preformed Plastic Pavement Marking (Type I)(Inlaid) 46,269 Sq Foot 502,786.60 10.87 627-02001 Preformed Plastic Pavement Marking (Type II) 198 Sq Foot 2,098.18 10.60 627-02010 Preformed Plastic Pavement Marking (Type II) (Inlaid) 10,700 Sq Foot 143,225.75 13.39 627-03001 Preformed Plastic Pavement Marking (Type III) 142 Sq Foot 1,789.20 12.60 627-03010 Preformed Plastic Pavement Marking (Type III) (Inlaid 255 Sq Foot 4,080.00 16.00 627-30105 Pavement Marking Paint (Word-Symbol) 22 Sq Foot 484.00 22.00 627-30205 Thermoplastic Pavement Marking (Word-Symbol) 4,728 Sq Foot 68,691.80 14.53 627-30210 Thermoplastic Pavement Marking (Xwalk-Stopline) 3,772 Sq Foot 41,068.10 10.89 627-30324 Preformed Plastic Pavement Marking (Word-Symbol) (Typ 1,433 Sq Foot 24,069.50 16.80 627-30326 Preformed Plastic Pavement Marking (Word - Symbol) (T 107 Sq Foot 2,086.50 19.50 627-30327 Preformed Plastic Pavement Marking (Word-Symbol) (Typ 7,149 Sq Foot 103,539.50 14.48 627-30329 Preformed Plastic Pavement Marking (Xwalk-Stop Line) 1,075 Sq Foot 13,835.20 12.87 627-30331 Preformed Plastic Pavement Marking (Xwalk - Stop Line 1,220 Sq Foot 16,104.00 13.20 627-30332 Preformed Plastic Pavement Marking (Xwalk-Stop Line) 10,077 Sq Foot 103,541.45 10.28 627-30405 Preformed Thermoplastic Pavement Marking (Word-Symbol 11,245 Sq Foot 175,788.11 15.63 627-30410 Preformed Thermoplastic Pavement Marking (Xwalk-Stop 35,749 Sq Foot 380,909.60 10.66 629-01001 Survey Monument (Type 1) 179 Each 19,400.00 108.38 629-01002 Survey Monument (Type 2) 56 Each 21,439.00 382.84 629-01003 Survey Monument (Type 3) 1 Each 401.53 401.53 629-01005 Survey Monument (Type 5) 15 Each 1,515.00 101.00 629-01011 Survey Monument (Type 1A) 26 Each 18,252.00 702.00 629-01031 Survey Monument (Type 3A) 27 Each 17,564.76 650.55 629-01050 Monument Box 6 Each 2,265.00 377.50 629-01065 Survey Monument (Type 5S) 6 Each 960.00 160.00 Colorado Department of Transportation 13:46 Tuesday, March 18, 2008 31 2007 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/07 THROUGH 12/31/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 629-01110 Locate Monuments 459 Hour 77,998.00 169.93 629-01210 Adjust Monument Box 36 Each 12,475.00 346.53 630-00000 Flagging 242,098 Hour 5,258,940.22 21.72 630-00001 Pilot Car Operation 6,110 Hour 220,999.00 36.17 630-00003 Uniformed Traffic Control 4,831 Hour 260,712.50 53.97 630-00004 Traffic Control Vehicle 9 Each 35,515.25 3,946.14 630-00007 Traffic Control Inspection 5,640 Day 607,779.28 107.76 630-00009 Traffic Control Vehicle (Truck) 2 Each 4,026.72 2,013.36 630-00011 Courtesy Vehicle 40 Day 48,000.00 1,200.00 630-00012 Traffic Control Management 9,837 Day 5,423,832.40 551.37 630-00015 Uniformed Traffic Control Coordination 4,102 Hour 124,800.50 30.42 630-00020 Traffic Control Vehicle 13 Day 1,807.00 139.00 630-00025 Traffic Control Vehicle 435 Hour 1,957.50 4.50 630-80001 Flashing Beacon (Portable) 117 Each 110,713.68 946.27 630-80002 Flashing Beacon (Solar) 80 Each 61,945.18 774.31 630-80305 Flagging Station Light 4 Each 4,000.00 1,000.00 630-80332 Barricade (Type 3 F-B) (Temporary) 2 Each 1,040.00 520.00 630-80335 Barricade (Type 3 M-A) (Temporary) 218 Each 36,462.47 167.26 630-80336 Barricade (Type 3 M-B) (Temporary) 120 Each 21,133.40 176.11 630-80337 Barricade (Type 3 M-C) (Temporary) 20 Each 5,500.16 275.01 630-80338 Barricade (Type 3 M-D) (Temporary) 17 Each 10,727.54 631.03 630-80341 Construction Traffic Sign (Panel Size A) 4,067 Each 235,213.58 57.83 630-80342 Construction Traffic Sign (Panel Size B) 6,007 Each 465,868.79 77.55 630-80343 Construction Traffic Sign (Panel Size C) 1,059 Each 108,944.79 102.88 630-80344 Construction Traffic Sign (Special) 12,017 Sq Foot 209,195.55 17.41 630-80348 Construction Information Sign 6 Each 1,536.00 256.00 630-80350 Vertical Panel 900 Each 15,975.00 17.75 630-80351 Vertical Panel (Plastic) 20 Each 440.00 22.00 630-80355 Portable Message Sign Panel 184 Each 1,044,807.13 5,678.30 630-80356 Advance Warning Flashing or Sequencing Arrow Panel (A 8 Each 10,620.00 1,327.50 630-80357 Advance Warning Flashing or Sequencing Arrow Panel (B 16 Each 13,215.14 825.95 630-80358 Advance Warning Flashing or Sequencing Arrow Panel (C 182 Each 244,640.88 1,344.18 630-80359 Portable Message Sign Panel 3,888 Day 341,530.89 87.84 630-80360 Drum Channelizing Device 14,437 Each 496,770.90 34.41 630-80363 Drum Channelizing Device (With Light) (Flashing) 700 Each 51,562.58 73.66 630-80364 Drum Channelizing Device (With Light) (Steady Burn) 478 Each 18,013.02 37.68 630-80365 Portable Message Sign Panel (State Furnished) 2 Each 2,000.00 1,000.00 630-80366 Portable Traffic Speed Monitor (State Purchased) 2 Each 80,000.00 40,000.00 Colorado Department of Transportation 13:46 Tuesday, March 18, 2008 32 2007 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/07 THROUGH 12/31/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 630-80367 Portable Traffic Speed Monitor 11 Each 86,598.13 7,872.56 630-80370 Concrete Barrier (Temporary) 72,595 Lin Foot 1,911,412.70 26.33 630-80375 Concrete Barrier (Temporary) (Install Only) 280 Lin Foot 18,100.00 64.64 630-80376 Guardrail Type 7 (Temporary) 5,964 Lin Foot 330,370.00 55.39 630-80378 Glare Screen (Temporary) 17,600 Lin Foot 332,980.00 18.92 630-80380 Traffic Cone 32,817 Each 334,357.50 10.19 630-80390 Channelizing Device (Special) 300 Each 5,100.00 17.00 630-80391 Channelizing Device (Fixed) 925 Each 36,875.00 39.86 630-80392 Stackable Tubular Marker 550 Each 3,657.50 6.65 630-80401 Delineator (Type I) (Temporary) 10 Each 755.00 75.50 630-80402 Delineator (Type II) (Temporary) 53 Each 4,001.50 75.50 630-80430 Rumble Strip (Portable) 29 Each 7,760.00 267.59 630-80510 Mobile Pavement Marking Zone 18 Lump Sum 32,338.00 1,796.56 630-80520 Mobile Pavement Marking Zone 57 Day 49,562.20 869.51 630-80560 Mobile Profilograph Operation Zone 1 Lump Sum 20,000.00 20,000.00 630-80570 Mobile Profilograph Operation Zone 2 Day 2,000.00 1,000.00 630-85006 Impact Attenuator (Sand Filled Plastic Barrel) (Tempo 38 Each 65,855.40 1,733.04 630-85010 Impact Attenuator (Temporary) 51 Each 251,134.60 4,924.21 630-85040 Impact Attenuator (Truck Mounted Attenuator) (Tempora 50 Each 1,017,960.70 20,359.21 630-85041 Impact Attenuator (Truck Mounted Attenuator) 274 Day 120,685.60 440.46 630-86800 Traffic Signal (Temporary) 4 Lump Sum 68,518.00 17,129.50 630-86810 Traffic Signal (Temporary) 7 Each 191,846.16 27,406.59 630-86820 Traffic Signal (Temporary)(State Furnished) 2 Each 12,213.50 6,106.75 631-00105 Highway Construction 1 Lump Sum 1,537,065.69 1,537,065.69 641-10052 Shotcrete Class 3 132 Sq Yard 16,236.00 123.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 1 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 201-00000 Clear and Grub LUMP SUM =============================================== IM 0253-194 ON I-25 IN WELD COUNTY 01/25/07 1.00 32000.00 12516.67 2300.00 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 1.00 3000.00 9914.17 2600.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 1.00 10000.00 97888.33 178165.00 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 1.00 8000.00 12766.67 3300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 13250.00 28600.00 46591.25 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 1.00 32973.76 52159.08 50000.00 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 1.00 25000.00 45800.00 15000.00 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 1.00 20000.00 27271.20 7224.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 1.00 200000.00 287525.18 179126.50 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 1.00 8000.00 16874.19 11024.50 SHE 133A-032 SH 133 BETWEEN REDSTONE AND M 05/24/07 1.00 3000.00 10827.50 2310.00 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 1.00 7500.00 20000.00 25000.00 IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 1.00 15000.00 22500.00 20000.00 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 1.00 3000.00 12631.10 10823.73 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 9.00 34941.53 51216.39 35612.08 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 1.00 150000.00 105829.80 66104.37 BRR500-087 US 160 PAGOSA SPRINGS 07/12/07 1.00 5000.00 3486.50 5573.00 C065A-020 SH65 GRAND MESA SLIDE REPAIR 07/26/07 1.00 20000.00 55000.00 10000.00 SHE 0702-267 NEAR VAIL IN EAGLE COUNTY 08/02/07 1.00 5100.00 104627.00 5000.00 BR 0253-192 I-25&128TH 08/16/07 1.00 30000.00 15151.79 9800.00 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 1.00 10000.00 29375.00 25000.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 1.00 33700.00 80632.63 11305.50 IM 0703-331 WB I-70 AT M.P. 259.70 AND M. 09/06/07 1.00 3000.00 12140.38 9261.52 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 32100.00 62040.83 17755.55 STA 340A-013 SH 340 IN FRUITA 10/25/07 1.00 3500.00 47250.00 50000.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 1.00 18216.25 62250.00 15000.00 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 1.00 12000.00 26199.43 5248.04 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 1.00 12000.00 35323.64 53500.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 1.00 10000.00 45667.61 100000.00 CC 0821-084 SH82 ASPEN 12/20/07 1.00 25000.00 81666.67 250000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 13452.71 49901.18 78958.01 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 27.00 26110.74 50974.64 41580.23 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 2 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 201-00001 Clear and Grub Acre =================================================== NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 0.50 10000.00 10437.88 2000.00 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 1.51 2000.00 6237.61 2605.00 SHE 0504-050 INTERSECTION OF SH 50B AND SH 03/22/07 1.90 1950.00 5525.52 3297.58 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.91 2998.72 6172.70 2864.18 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 3.20 2600.00 3700.00 3600.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 0.23 7500.00 20050.00 12550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.43 2928.57 4796.36 4200.15 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 4.70 2000.00 2523.27 4500.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 1.00 90000.00 51866.63 100000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.70 17438.60 9700.49 21254.39 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13.04 9292.18 7432.03 11254.25 =============== 202-00000 Rem Str and Obstructions LUMP SUM =============================================== IM 0703-319 EJMT 24.9 KV SERVICE 01/25/07 1.00 28000.00 43340.16 19964.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 28000.00 43340.16 19964.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 1.00 5000.00 6916.67 9000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 5000.00 6916.67 9000.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 1.00 75000.00 52773.20 20000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 75000.00 52773.20 20000.00 IM 0703-326 EISENHOWER JOHNSON MEMORIAL T 12/06/07 1.00 292000.00 116719.90 45600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 292000.00 116719.90 45600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 100000.00 54771.00 23641.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 3 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00001 Rem Structure Each =================================================== NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 11.00 1000.00 1365.58 1404.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11.00 1000.00 1365.58 1404.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 42.00 550.00 782.94 1101.77 STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 1.00 1200.00 548.67 425.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 3.00 500.00 751.33 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 46.00 560.87 773.71 1080.42 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 1.00 950.00 2661.10 2106.82 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 1.00 1000.00 4176.05 5000.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 1.00 1300.00 1230.63 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 1083.33 2770.09 2868.94 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 60.00 667.50 1003.19 1229.17 =============== 202-00003 Rem of Structure (Spec) LUMP SUM =============================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 1.00 35000.00 37327.54 12168.67 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 1.00 375000.00 270038.92 277233.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 205000.00 176954.37 144701.09 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 1.00 100000.00 129900.50 196277.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 100000.00 129900.50 196277.00 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 1.00 4998.00 5141.88 6000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 4998.00 5141.88 6000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 128749.50 115999.85 122919.79 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 4 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00004 Rem Steel H or Pipe Piling Lin Foot =============================================== BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 321.00 50.00 24.27 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 321.00 50.00 24.27 25.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 321.00 50.00 24.27 25.00 =============== 202-00008 Tree Trimming Hour =================================================== STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 10.00 100.00 218.83 380.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 100.00 218.83 380.00 SHE0092-019 SH 9 NORTH OF SILVERTHORNE, I 10/18/07 76.00 156.25 274.60 336.00 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 20.00 165.00 131.76 81.34 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 96.00 158.07 236.14 282.95 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 106.00 152.59 234.35 292.10 =============== 202-00009 Tree Trimming LUMP SUM =============================================== SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 1.00 1000.00 400.00 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1000.00 400.00 400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1000.00 400.00 400.00 =============== 202-00010 Rem Tree Each =================================================== STA 012A-042 SH 12, S. OF LA VETA 01/18/07 100.00 200.00 261.83 21.00 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 6.00 275.00 680.00 650.00 NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 2.00 400.00 485.67 200.00 STA 0661-009 ON SH 66 IN WELD COUNTY 02/01/07 12.00 265.00 327.61 800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 120.00 213.58 290.64 133.33 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 1.00 465.00 803.95 1300.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 5 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00010 Rem Tree Each =================================================== STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 24.00 250.00 510.00 750.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 47.00 350.00 407.80 355.68 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 2.00 200.00 1142.73 1114.50 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 19.00 300.00 821.67 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 93.00 311.99 538.01 513.40 C065A-020 SH65 GRAND MESA SLIDE REPAIR 07/26/07 10.00 500.00 566.67 600.00 BR 0253-192 I-25&128TH 08/16/07 1.00 450.00 1219.04 640.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 35.00 500.00 400.63 327.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 46.00 498.91 452.47 393.53 SHE0092-019 SH 9 NORTH OF SILVERTHORNE, I 10/18/07 26.00 484.00 224.16 222.60 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 4.00 500.00 567.03 150.00 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 35.00 300.00 431.84 370.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 65.00 385.91 368.76 297.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 324.00 316.91 376.58 312.30 =============== 202-00014 Brush Clearing Hour =================================================== SHE0092-019 SH 9 NORTH OF SILVERTHORNE, I 10/18/07 96.00 277.00 295.94 375.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 96.00 277.00 295.94 375.90 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 96.00 277.00 295.94 375.90 =============== 202-00015 Rem Headwall Each =================================================== NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 1.00 700.00 2569.00 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 700.00 2569.00 2000.00 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 9.00 1500.00 973.33 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 9.00 1500.00 973.33 1500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 1420.00 1222.66 1550.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 6 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00019 Rem Inlet Each =================================================== NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 5.00 700.00 654.00 500.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 39.00 1300.00 1186.17 1404.00 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 1.00 1000.00 1156.88 730.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 45.00 1226.67 1095.91 1288.58 NH 0405-025 KIT CARSON BRIDGE 04/26/07 2.00 651.69 609.52 750.00 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 1.00 650.00 679.28 871.10 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 1.00 800.00 889.47 1141.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 29.00 1000.00 750.58 1225.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 10.00 1200.00 591.00 800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 43.00 1017.52 718.89 1093.89 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 1.00 2000.00 1061.71 1016.71 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 2.00 1000.00 2345.63 750.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 4.00 1200.00 992.50 1525.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7.00 1257.14 1205.58 1230.96 STA 340A-013 SH 340 IN FRUITA 10/25/07 1.00 1200.00 1201.25 1100.00 C 0504-055 PUEBLO COUNTY, US-50C AT SALT 11/01/07 2.00 1000.00 1133.33 500.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 2.00 830.00 1194.13 900.00 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 1.00 800.00 872.77 383.51 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 3.00 500.00 933.13 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9.00 795.56 1051.31 809.28 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 104.00 1104.94 940.04 1162.72 =============== 202-00020 Rem CBC Each =================================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 1.00 25000.00 43359.14 76094.57 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 25000.00 43359.14 76094.57 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 25000.00 43359.14 76094.57 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 7 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00021 Rem Manhole Each =================================================== NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 1.00 1500.00 894.00 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1500.00 894.00 1500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1500.00 894.00 1500.00 =============== 202-00023 Rem Emb Prot Ty 3 Each =================================================== IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 5.00 500.00 1375.00 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 500.00 1375.00 125.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 500.00 1375.00 125.00 =============== 202-00025 Rem Ditch Lining Lin Foot =============================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 2,974.00 10.00 6.86 2.44 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,974.00 10.00 6.86 2.44 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,974.00 10.00 6.86 2.44 =============== 202-00026 Rem S and D Pave Sq Yard ================================================ BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 62.00 24.00 23.40 38.50 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 32.00 30.00 13.33 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 94.00 26.04 21.34 30.84 SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 37.00 30.00 30.00 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 37.00 30.00 30.00 30.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 131.00 27.16 21.97 30.60 =============== 202-00027 Rem Riprap Sq Yard ================================================ IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 1,374.00 15.00 10.75 6.51 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,374.00 15.00 10.75 6.51 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 8 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00027 Rem Riprap Sq Yard ================================================ BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 144.00 14.00 19.98 5.67 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 144.00 14.00 19.98 5.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,518.00 14.91 12.18 6.43 =============== 202-00030 Rem Water Service Each =================================================== STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 1.00 5488.75 1797.77 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 5488.75 1797.77 1500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5488.75 1797.77 1500.00 =============== 202-00033 Rem Pipe Each =================================================== STA 012A-042 SH 12, S. OF LA VETA 01/18/07 24.00 1500.00 1867.50 955.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 24.00 1500.00 1867.50 955.00 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 1.00 866.13 1341.76 820.00 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 2.00 1000.00 1626.67 680.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 29.00 350.00 1102.72 1225.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 32.00 406.75 1138.48 1178.28 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 3.00 1300.00 1075.21 500.00 CR100-126 WEST OF KIT CARSON 08/16/07 2.00 580.06 1811.87 1800.00 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 4.00 3000.00 11802.09 1700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9.00 1895.57 4921.38 1322.22 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 3.00 1500.00 1395.52 720.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 9 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00033 Rem Pipe Each =================================================== STA 340A-013 SH 340 IN FRUITA 10/25/07 3.00 925.00 1211.25 800.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 6.00 1288.50 1459.33 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 12.00 1250.50 1404.68 880.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 77.00 1053.02 1793.82 1079.03 =============== 202-00035 Rem Pipe Lin Foot =============================================== NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 718.00 12.00 21.30 34.00 IM 0703-319 EJMT 24.9 KV SERVICE 01/25/07 40.00 30.00 33.75 20.80 NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 6.00 100.00 610.00 610.00 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 127.00 20.00 21.58 11.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 660.00 27.00 34.28 48.60 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 150.00 25.00 35.18 7.15 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 3.00 20.00 65.25 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,704.00 20.30 27.89 37.33 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 10.00 50.16 69.02 140.00 NH 0405-025 KIT CARSON BRIDGE 04/26/07 162.00 19.77 25.94 30.00 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 77.00 30.00 148.00 100.00 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 28.00 25.00 49.03 31.10 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 7,823.00 15.00 16.98 12.90 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 8.00 15.00 355.63 380.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 1,955.00 18.00 27.33 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10,063.00 15.84 19.98 15.69 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 927.00 30.00 20.92 11.89 BRR500-087 US 160 PAGOSA SPRINGS 07/12/07 109.00 75.00 96.00 157.00 SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 9.00 50.00 40.00 40.00 C065A-020 SH65 GRAND MESA SLIDE REPAIR 07/26/07 55.00 100.00 95.00 85.00 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 6.00 100.00 211.25 100.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 240.00 40.00 38.72 34.50 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 98.00 28.00 39.38 34.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,444.00 38.00 26.96 31.43 BR R300-130 I-70 (VARIOUS LOCATIONS) 10/18/07 84.00 50.00 35.00 35.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 10 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00035 Rem Pipe Lin Foot =============================================== C 0504-055 PUEBLO COUNTY, US-50C AT SALT 11/01/07 125.00 25.00 41.33 4.00 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 23.00 30.00 31.36 15.83 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 503.00 50.00 27.27 15.00 CC 0821-084 SH82 ASPEN 12/20/07 382.00 10.00 34.44 34.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,117.00 33.11 31.26 22.01 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14,328.00 19.95 23.16 20.34 =============== 202-00037 Rem of End Section Each =================================================== IM 0703-319 EJMT 24.9 KV SERVICE 01/25/07 1.00 450.00 262.97 400.80 NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 2.00 550.00 622.00 622.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 516.67 406.58 548.27 SHE 0251-175 ALONG I 25 NORTH OF THE CITY 04/26/07 4.00 500.00 257.32 206.00 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 2.00 450.00 213.88 435.50 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 45.00 200.00 149.33 98.82 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 2.00 200.00 246.67 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 53.00 232.08 164.56 120.60 CR100-126 WEST OF KIT CARSON 08/16/07 14.00 256.32 339.56 350.00 IM R400-215 I-25 & I-76 VMS INSTALLATION 09/06/07 1.00 350.00 954.00 1070.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 1.00 780.00 446.75 850.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 16.00 294.91 393.42 426.25 BR R300-130 I-70 (VARIOUS LOCATIONS) 10/18/07 1.00 500.00 733.33 650.00 STA 340A-013 SH 340 IN FRUITA 10/25/07 4.00 145.00 237.50 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 216.00 315.79 370.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 77.00 255.18 227.14 216.97 =============== 202-00038 Rem Structural Plate Pipe Lin Foot =============================================== HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 79.00 50.00 181.55 132.88 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 79.00 50.00 181.55 132.88 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 79.00 50.00 181.55 132.88 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 11 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00070 Rem Barricade Each =================================================== NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 1.00 250.00 439.00 450.00 SHE 0504-050 INTERSECTION OF SH 50B AND SH 03/22/07 1.00 200.00 743.48 362.57 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 225.00 605.08 406.29 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 225.00 605.08 406.29 =============== 202-00080 Rem Guard Post Each =================================================== STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 3.00 200.00 179.33 130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 200.00 179.33 130.00 SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 3.00 95.00 30.00 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 95.00 30.00 30.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 147.50 142.00 80.00 =============== 202-00090 Rem Delineator Each =================================================== HB 0063-021 US 6: RIFLE TO NEW CASTLE 01/04/07 10.00 12.00 9.51 5.85 STA 0961-012 SH 96, OVERLAY IN PUEBLO 01/04/07 28.00 11.00 8.55 5.75 STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 750.00 4.25 4.62 3.50 STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 400.00 10.00 6.39 6.00 NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 2.00 10.00 11.05 5.45 STA 012A-042 SH 12, S. OF LA VETA 01/18/07 514.00 7.00 7.54 4.00 STA 069A-021 SH 69, W. OF WALSENBURG 01/25/07 466.00 7.00 3.05 1.10 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 6.00 7.50 11.08 3.10 HB 149A-023 SOUTH FORK TO CREEDE - SHOULD 02/08/07 2.00 10.00 28.62 25.00 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 5.00 10.00 8.21 5.15 IM0252-388 I-25 LARKSPUR INTERCHANGE NOR 03/08/07 272.00 10.00 11.82 16.45 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 36.00 10.00 10.05 11.40 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 725.00 6.00 3.98 3.75 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 28.00 10.00 14.00 10.00 STA0091-030 SH 9 BETWEEN FAIRPLAY AND ALM 03/22/07 120.00 10.00 4.81 2.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,364.00 6.99 5.72 4.79 SHE 165A-011 ALONG SH 165 N/O RYE 04/05/07 100.00 10.00 5.88 6.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 12 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00090 Rem Delineator Each =================================================== HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 100.00 8.03 14.36 10.00 NH 0405-025 KIT CARSON BRIDGE 04/26/07 32.00 8.02 8.23 8.50 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 117.00 12.00 29.00 4.00 SHE 0251-175 ALONG I 25 NORTH OF THE CITY 04/26/07 100.00 10.00 5.13 4.30 STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 30.00 10.74 15.45 31.00 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 35.00 10.00 22.78 12.50 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 40.00 10.00 8.17 9.00 STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 354.00 7.02 3.45 2.15 IM0703-317 FROM MP 221.30 TO MP 251.30 J 05/17/07 25.00 10.47 16.67 30.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 430.00 9.00 5.04 4.95 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 40.00 10.00 6.20 9.00 NH 3851-016 US 385 NORTH OF BURLINGTON 05/24/07 19.00 11.55 15.72 5.15 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 6.00 10.00 14.00 11.00 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 7.00 15.00 20.26 10.79 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,435.00 9.02 9.05 6.09 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 50.00 10.00 13.29 11.10 SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 6.00 20.00 15.00 15.00 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 17.00 7.00 7.12 5.50 BR 0253-192 I-25&128TH 08/16/07 19.00 10.00 25.58 31.00 CR100-126 WEST OF KIT CARSON 08/16/07 238.00 7.16 18.67 6.00 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 4.00 10.00 11.83 10.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 10.00 13.00 14.75 5.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 344.00 8.15 16.95 8.29 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 6.00 20.00 11.67 16.67 STA 340A-013 SH 340 IN FRUITA 10/25/07 17.00 12.00 8.50 5.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 4.00 10.00 15.29 20.00 CC 0821-084 SH82 ASPEN 12/20/07 25.00 10.00 15.78 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 52.00 11.81 13.51 10.39 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,195.00 7.68 7.24 5.43 =============== 202-00155 Rem Wall Lin Foot =============================================== STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 138.00 40.00 25.67 23.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 138.00 40.00 25.67 23.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 13 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00155 Rem Wall Lin Foot =============================================== STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 335.00 20.00 91.73 17.91 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 335.00 20.00 91.73 17.91 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 473.00 25.84 76.14 19.40 =============== 202-00170 Grinding And Texturing Conc Pvmt Sq Yard ================================================ HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 40.00 152.23 64.33 85.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 40.00 152.23 64.33 85.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 152.23 64.33 85.00 =============== 202-00190 Rem of Conc Median Cover Matl Sq Yard ================================================ NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 30.00 14.00 20.97 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 30.00 14.00 20.97 45.00 NH 0405-025 KIT CARSON BRIDGE 04/26/07 2,191.00 11.68 7.57 8.50 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 77.00 10.00 11.83 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,268.00 11.62 7.68 8.75 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 570.00 18.00 17.41 36.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 570.00 18.00 17.41 36.50 STA 340A-013 SH 340 IN FRUITA 10/25/07 473.00 10.00 11.39 10.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 461.00 9.75 15.64 9.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 14 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00190 Rem of Conc Median Cover Matl Sq Yard ================================================ STSR400-229 SH 14, SH 93, & SH 157 IN BOU 12/06/07 35.00 20.00 48.25 35.00 CC 0821-084 SH82 ASPEN 12/20/07 1,034.00 6.00 20.52 19.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,003.00 8.05 17.98 15.28 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,871.00 10.92 13.98 14.91 =============== 202-00195 Rem of Median Cover Sq Yard ================================================ NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 332.00 15.00 16.41 18.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 332.00 15.00 16.41 18.45 NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 3.00 20.00 181.00 32.00 CR400-216 SIGNALS @ US34 & SH37, KERSEY 05/24/07 8.00 15.00 116.00 127.00 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 71.00 20.00 36.08 19.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 651.00 10.00 8.53 6.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 733.00 11.06 13.66 8.95 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 38.00 15.00 23.70 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 38.00 15.00 23.70 14.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,103.00 12.38 15.39 11.99 =============== 202-00200 Rem Sidewalk Sq Yard ================================================ HB 0063-021 US 6: RIFLE TO NEW CASTLE 01/04/07 130.00 25.00 41.56 9.35 STA 0961-012 SH 96, OVERLAY IN PUEBLO 01/04/07 1,069.00 8.00 25.16 13.65 STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 77.00 20.00 23.38 24.00 STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 41.00 20.00 85.96 103.00 NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 7.00 45.00 48.94 35.00 NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 471.00 10.00 14.30 4.00 SHE 0931-027 SH 93 @ SH 72 01/25/07 10.00 25.00 66.32 45.00 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 7.00 45.00 56.75 51.50 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 5,128.00 14.00 13.07 10.20 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 1,222.00 10.00 12.92 6.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 15 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00200 Rem Sidewalk Sq Yard ================================================ STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 52.00 15.00 38.75 40.00 HB 065A-019 SH 65 THRU CEDAREDGE 03/08/07 23.00 30.00 46.90 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8,237.00 12.78 16.84 10.65 NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 1,233.00 30.00 25.43 9.70 NH 030A-025 SH30 (HAVANA)- PARKER TO FLOR 04/19/07 452.00 12.00 26.72 24.15 NH 0405-025 KIT CARSON BRIDGE 04/26/07 154.00 10.07 11.03 20.00 NH0341-071 US 34: GARFIELD TO MORNING DR 06/14/07 342.00 4.50 24.00 4.00 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 55.00 25.00 35.33 19.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 885.00 7.00 7.63 6.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,121.00 17.01 21.16 10.88 BR 0253-192 I-25&128TH 08/16/07 60.00 15.00 16.49 12.75 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 170.00 20.00 30.38 17.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 1,590.00 12.00 16.53 36.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,820.00 12.85 17.20 33.90 STA 340A-013 SH 340 IN FRUITA 10/25/07 847.00 10.00 9.88 12.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 250.00 17.00 14.83 7.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 28.00 30.00 30.78 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,125.00 12.05 12.29 11.04 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14,303.00 13.65 17.35 13.69 =============== 202-00201 Rem Curb Lin Foot =============================================== NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 414.00 10.00 5.27 3.50 NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 277.00 10.00 13.90 13.90 IM0252-388 I-25 LARKSPUR INTERCHANGE NOR 03/08/07 1,000.00 4.00 3.94 3.70 HB 065A-019 SH 65 THRU CEDAREDGE 03/08/07 11.00 20.00 41.60 50.00 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 6,093.00 4.00 6.10 5.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7,795.00 4.55 5.88 5.37 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 16 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00201 Rem Curb Lin Foot =============================================== SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 498.00 3.50 6.38 4.50 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 147.00 10.00 6.58 10.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 645.00 4.98 6.41 5.87 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 142.00 8.00 11.82 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 142.00 8.00 11.82 7.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,582.00 4.64 6.12 5.43 =============== 202-00202 Rem Gutter Lin Foot =============================================== NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 46.00 40.00 17.47 16.00 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 270.00 25.00 23.67 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 316.00 27.18 22.09 19.42 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 49.00 15.00 8.33 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 49.00 15.00 8.33 15.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 162.00 16.00 12.88 8.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 162.00 16.00 12.88 8.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 527.00 22.61 17.11 15.65 =============== 202-00203 Rem Curb and Gutter Lin Foot =============================================== HB 0063-021 US 6: RIFLE TO NEW CASTLE 01/04/07 1,363.00 8.00 18.10 7.60 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 17 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00203 Rem Curb and Gutter Lin Foot =============================================== STA 0961-012 SH 96, OVERLAY IN PUEBLO 01/04/07 3,330.00 5.00 13.57 9.70 STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 562.00 8.00 7.00 7.50 STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 265.00 8.00 11.18 12.00 NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 1,175.00 15.00 8.23 5.50 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 2,115.00 6.00 5.41 3.50 NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 500.00 12.00 6.42 4.00 SHE 0931-027 SH 93 @ SH 72 01/25/07 10.00 20.00 36.36 33.00 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 216.00 15.00 12.38 11.35 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 10,800.00 5.50 5.59 4.77 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 1,525.00 8.00 6.65 3.75 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 2,269.00 7.00 6.43 3.25 SHE 1151-018 SH 115 - GUMAER AVENUE EAST 03/08/07 36.00 16.00 18.75 9.45 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 102.00 7.00 40.67 43.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 24,268.00 6.70 8.42 5.69 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 17.00 39.13 27.59 50.00 NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 2,098.00 12.00 15.95 10.80 NH 030A-025 SH30 (HAVANA)- PARKER TO FLOR 04/19/07 578.00 8.00 13.42 5.85 NH 0405-025 KIT CARSON BRIDGE 04/26/07 8,536.00 5.69 3.86 4.25 NH0341-071 US 34: GARFIELD TO MORNING DR 06/14/07 500.00 4.50 8.33 4.00 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 775.00 9.00 12.88 9.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 5,156.00 4.00 4.70 4.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 17,660.00 6.17 6.65 5.40 SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 87.00 6.00 18.00 18.00 BR 0253-192 I-25&128TH 08/16/07 1,159.00 4.50 5.57 3.30 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 347.00 10.00 16.85 11.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 8,779.00 7.00 8.27 5.50 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 1,428.00 7.00 9.75 8.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 11,800.00 6.84 8.26 5.90 STA 340A-013 SH 340 IN FRUITA 10/25/07 954.00 7.50 6.25 5.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 932.00 7.50 8.39 2.50 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 131.00 10.00 12.60 8.00 CC 0821-084 SH82 ASPEN 12/20/07 2,854.00 4.50 10.58 9.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,871.00 5.81 9.51 7.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 58,599.00 6.49 8.06 5.75 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 18 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00204 Rem C, G and Sidewalk Lin Foot =============================================== HB 065A-019 SH 65 THRU CEDAREDGE 03/08/07 43.00 25.00 52.33 20.00 STA0091-030 SH 9 BETWEEN FAIRPLAY AND ALM 03/22/07 16.00 40.00 61.77 43.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 59.00 29.07 54.57 26.26 STA 340A-013 SH 340 IN FRUITA 10/25/07 676.00 15.00 8.91 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 676.00 15.00 8.91 14.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 735.00 16.13 13.99 14.98 =============== 202-00206 Rem Conc Curb Ramp Sq Yard ================================================ HB 0063-021 US 6: RIFLE TO NEW CASTLE 01/04/07 113.00 25.00 52.27 53.00 STA 0961-012 SH 96, OVERLAY IN PUEBLO 01/04/07 397.00 16.00 30.68 22.25 STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 55.00 30.00 87.73 110.00 NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 393.00 22.00 27.14 31.70 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 142.00 25.00 40.28 37.00 STA0091-030 SH 9 BETWEEN FAIRPLAY AND ALM 03/22/07 36.00 25.00 37.87 52.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,136.00 21.06 36.19 35.63 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 115.00 20.00 11.80 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 115.00 20.00 11.80 9.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 36.00 60.00 37.64 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 36.00 60.00 37.64 20.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,287.00 22.05 35.05 32.82 =============== 202-00210 Rem Conc Pavement Sq Yard ================================================ STA 0961-012 SH 96, OVERLAY IN PUEBLO 01/04/07 342.00 20.00 31.62 21.95 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 19 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00210 Rem Conc Pavement Sq Yard ================================================ NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 7,875.00 20.00 10.17 7.50 IM 0253-194 ON I-25 IN WELD COUNTY 01/25/07 25,332.00 4.00 33.17 16.00 NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 130.00 20.00 55.50 55.50 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 1,515.00 13.00 21.20 14.59 SHE 1151-018 SH 115 - GUMAER AVENUE EAST 03/08/07 33.00 80.00 35.67 17.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 35,227.00 8.25 25.30 14.24 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 5,804.00 7.31 10.41 6.00 NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 316.00 35.00 65.00 81.00 NH 030A-025 SH30 (HAVANA)- PARKER TO FLOR 04/19/07 67.00 35.00 24.98 20.50 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 2,258.00 15.00 9.83 6.60 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 7,619.00 10.00 9.13 11.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 886.00 30.00 10.35 9.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16,950.00 11.36 10.77 9.97 SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 18.00 40.00 65.00 65.00 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 55.00 40.00 175.63 70.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 448.00 25.00 28.53 53.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 521.00 27.10 37.30 55.21 C120A-007 ON SH 120 AT PORTLAND OVER TH 11/29/07 182.00 10.00 18.50 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 182.00 10.00 18.50 20.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 52,880.00 9.44 19.52 13.30 =============== 202-00215 Rem Conc Pvmt (Planing) Sq Yard ================================================ NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 1,718.00 3.00 8.73 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,718.00 3.00 8.73 7.00 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 643.00 19.00 9.94 10.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 643.00 19.00 9.94 10.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,361.00 7.36 9.01 8.02 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 20 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00220 Rem Asphalt Mat Sq Yard ================================================ STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 35.00 30.00 82.23 100.00 NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 3,124.00 12.00 7.43 7.35 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 6,598.00 5.00 7.16 3.80 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 356.00 10.00 16.92 5.50 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 331.00 10.00 14.04 8.25 SHE 1151-020 SH 115 VMS, MP 17 AND MP 41 02/15/07 43.00 25.00 115.50 77.32 SHE 5502-054 02/22/07 147.00 20.00 65.28 86.30 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 665.00 10.00 17.68 14.85 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 1,860.00 5.00 9.21 6.65 SHE 1151-018 SH 115 - GUMAER AVENUE EAST 03/08/07 647.00 12.00 15.89 5.95 HB 065A-019 SH 65 THRU CEDAREDGE 03/08/07 155.00 10.00 32.33 10.00 IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 300.00 12.00 7.92 3.80 SHE 0504-050 INTERSECTION OF SH 50B AND SH 03/22/07 634.00 8.00 12.04 12.18 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 14,895.00 7.81 10.51 7.30 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 11,996.00 2.52 3.35 4.00 NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 276.00 10.00 26.50 27.00 NH 030A-025 SH30 (HAVANA)- PARKER TO FLOR 04/19/07 37.00 40.00 40.02 30.20 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 9,475.00 4.00 3.83 5.00 STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 1,533.00 6.50 26.36 23.32 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 282.00 15.00 15.01 22.05 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 1,822.00 15.00 6.15 5.50 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 1,072.00 4.00 6.49 4.50 BR 059A-032 ON SH 59 IN SEDGWICK COUNTY 06/07/07 513.00 10.00 10.52 9.00 IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 4,915.00 4.00 12.50 10.00 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 24.50 20.00 65.25 42.00 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 1,779.00 6.50 9.33 6.50 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 4,048.00 3.00 3.39 3.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 2,202.00 8.00 6.45 4.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 39,974.50 4.62 5.91 6.25 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 4,210.60 10.00 5.13 1.81 SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 178.00 10.00 36.00 36.00 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 3,226.00 4.50 8.85 6.00 BR 0253-192 I-25&128TH 08/16/07 10,893.00 5.50 3.69 3.30 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 18,253.00 5.00 6.11 4.50 IM 0703-331 WB I-70 AT M.P. 259.70 AND M. 09/06/07 345.00 6.00 25.99 31.29 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 2,700.00 3.50 5.21 3.75 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 21 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00220 Rem Asphalt Mat Sq Yard ================================================ STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 5,033.00 18.00 10.88 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 44,838.60 6.95 6.11 6.20 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 612.00 9.00 20.34 15.00 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 1,333.00 4.00 11.00 4.01 SHE0092-019 SH 9 NORTH OF SILVERTHORNE, I 10/18/07 460.00 16.25 27.60 24.70 STA 340A-013 SH 340 IN FRUITA 10/25/07 17,703.00 3.00 4.34 4.00 C 0504-055 PUEBLO COUNTY, US-50C AT SALT 11/01/07 1,516.00 10.00 8.83 5.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 27,301.00 3.75 5.13 4.00 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 2,300.00 4.50 5.85 3.01 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 397.00 9.00 16.92 30.00 C0703-338 CLEAR CREEK COUNTY 12/05/07 500.00 12.00 21.33 21.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 1,527.00 5.00 9.88 11.00 CC 0821-084 SH82 ASPEN 12/20/07 18,208.00 7.00 9.98 6.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 71,857.00 4.79 6.88 5.22 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 171,565.10 5.58 6.88 5.90 =============== 202-00226 Rem of Asph Mat (Special) Sq Yard ================================================ IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 267,806.00 2.50 3.15 3.21 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 267,806.00 2.50 3.15 3.21 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 267,806.00 2.50 3.15 3.21 =============== 202-00240 Rem Asphalt Mat (Planing) Sq Yard ================================================ HB 0063-021 US 6: RIFLE TO NEW CASTLE 01/04/07 40,681.00 2.50 3.12 2.30 STA 0961-012 SH 96, OVERLAY IN PUEBLO 01/04/07 127,922.00 3.00 4.02 2.75 STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 30,499.00 2.70 2.04 1.80 IM 0702-269 I 70 IN EAGLE COUNTY 01/11/07 35,011.00 2.50 5.50 3.00 IM 0702-270 I 70 THROUGH GLENWOOD CANYON 01/11/07 31,273.00 2.50 5.45 5.05 STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 56,812.00 2.20 1.40 1.40 NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 179,339.00 1.60 1.51 1.45 BR 109A-018 SH 109 LA JUNTA, SH50, MANZI 01/11/07 6,097.00 4.00 3.25 3.00 STA 012A-042 SH 12, S. OF LA VETA 01/18/07 578.00 6.00 17.46 14.00 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 46,437.00 2.00 3.60 3.50 STA 069A-021 SH 69, W. OF WALSENBURG 01/25/07 55,623.00 3.00 2.06 1.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 22 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00240 Rem Asphalt Mat (Planing) Sq Yard ================================================ NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 70,752.00 2.25 1.62 2.20 NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 2,943.00 3.25 4.20 4.20 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 1,058.00 4.00 8.29 7.00 STA 1251-005 SH 125 AND 127 NORTH OF COWDR 02/08/07 2,395.00 6.00 5.46 4.00 NH 0062-023 SH 6, CLEAR CREEK CANYON 02/08/07 21,209.00 6.30 8.08 6.15 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 141,018.00 1.50 1.19 0.79 IM0252-388 I-25 LARKSPUR INTERCHANGE NOR 03/08/07 113,399.00 2.00 1.81 1.70 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 8,014.00 4.00 3.01 2.20 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 2,255.00 5.00 7.56 3.55 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 38,166.00 5.00 2.14 1.75 HB 065A-019 SH 65 THRU CEDAREDGE 03/08/07 3,516.00 5.00 4.58 5.50 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 228,415.00 2.20 2.76 2.28 IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 209,149.00 1.65 1.37 1.14 SHE 0504-050 INTERSECTION OF SH 50B AND SH 03/22/07 90.00 25.00 48.75 58.02 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,452,651.00 2.27 2.25 1.98 NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 111,321.00 2.75 2.45 2.45 NH 030A-025 SH30 (HAVANA)- PARKER TO FLOR 04/19/07 57,858.00 1.50 2.07 0.95 STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 8,779.00 4.95 5.63 3.14 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 1,751.00 3.00 7.70 4.30 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 232.00 18.00 25.61 22.00 STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 14,724.00 2.30 1.98 1.85 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 1,942.00 3.50 2.55 1.20 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 20,327.00 4.00 2.16 2.00 NH 3851-016 US 385 NORTH OF BURLINGTON 05/24/07 3,062.00 4.49 6.45 5.35 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 1,356.00 10.00 8.00 8.00 NH0341-071 US 34: GARFIELD TO MORNING DR 06/14/07 45,394.00 2.25 2.37 2.50 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 1,103.00 7.00 7.83 8.50 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 8,172.00 4.50 2.88 2.00 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 318,255.00 1.47 2.08 1.98 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 11,047.00 3.50 2.37 1.65 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 1,989.00 10.00 6.89 4.83 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 607,312.00 2.09 2.30 2.08 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 1,874.00 6.00 8.45 4.65 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 1,742.00 5.00 6.17 6.50 C065A-020 SH65 GRAND MESA SLIDE REPAIR 07/26/07 1,750.00 9.00 13.67 11.00 CR100-126 WEST OF KIT CARSON 08/16/07 2,655.00 4.01 5.45 5.00 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 220.00 25.00 24.27 45.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 581.00 12.00 14.48 14.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 23 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00240 Rem Asphalt Mat (Planing) Sq Yard ================================================ C0701-187 I-70 20 ROAD BRIDGE REPAIR 09/06/07 844.00 5.00 12.40 13.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 6,565.00 22.00 3.35 1.90 C R600 - 300 VARIOUS LOCATIONS IN REGION 6 09/27/07 4,980.00 5.00 5.18 4.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 21,211.00 10.96 6.38 5.53 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 910.00 5.00 6.67 5.00 STA 340A-013 SH 340 IN FRUITA 10/25/07 168.00 12.00 40.50 42.00 C 0504-055 PUEBLO COUNTY, US-50C AT SALT 11/01/07 5,469.00 4.50 4.17 3.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 1,082.00 7.25 6.25 5.50 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 1,431.00 4.50 4.62 4.20 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 4,655.00 4.00 3.87 3.00 CC 0821-084 SH82 ASPEN 12/20/07 42,295.00 4.00 3.32 2.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 56,010.00 4.16 3.70 3.08 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,137,184.00 2.35 2.35 2.07 =============== 202-00246 Rem Asphalt Mat (Planing)(Special) Sq Yard ================================================ NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 3,550.00 6.00 9.95 6.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 4,566.00 11.00 8.86 4.32 IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 9,363.00 5.00 4.24 4.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 17,479.00 6.77 6.12 4.95 C R600 - 300 VARIOUS LOCATIONS IN REGION 6 09/27/07 3,640.00 7.00 9.64 7.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,640.00 7.00 9.64 7.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21,119.00 6.81 6.72 5.43 =============== 202-00250 Rem Pavement Marking Sq Foot ================================================ IM 0702-270 I 70 THROUGH GLENWOOD CANYON 01/11/07 42,900.00 1.00 1.08 1.30 SHE 0931-027 SH 93 @ SH 72 01/25/07 200.00 3.00 3.89 6.00 NH 1602-102 WITHIN THE ALAMOSA CITY LIMIT 02/15/07 265.00 8.00 5.75 5.50 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 11,075.00 2.50 2.46 2.43 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 24 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00250 Rem Pavement Marking Sq Foot ================================================ STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 1,030.00 2.50 3.44 4.35 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 200.00 4.00 2.50 2.20 SHE 1151-018 SH 115 - GUMAER AVENUE EAST 03/08/07 448.00 3.00 2.97 2.70 SHE 0504-050 INTERSECTION OF SH 50B AND SH 03/22/07 2,440.00 3.00 1.71 1.58 STA402A-007 SH 402 & I-25 OFFRAMS AND E. 03/22/07 350.00 2.50 2.93 3.18 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 58,908.00 1.46 1.55 1.64 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 4,275.00 1.44 1.09 1.10 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 2,519.00 2.00 1.73 1.20 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 9,000.00 1.50 1.28 1.50 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 6,000.00 1.50 1.27 1.50 IM 0253-196 I-25: 48TH AVE TO US 36 225: 05/31/07 25,471.00 1.00 1.34 1.25 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 4,318.00 2.00 1.97 2.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 40,950.00 1.00 0.92 0.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 92,533.00 1.18 1.16 1.12 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 1,000.00 2.00 2.07 1.58 SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 211.00 3.00 3.00 3.00 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 1,800.00 3.50 1.24 1.10 BR 0253-192 I-25&128TH 08/16/07 700.00 4.00 2.46 2.10 CR100-126 WEST OF KIT CARSON 08/16/07 10,000.00 0.90 1.30 1.25 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 100.00 5.00 6.67 10.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 800.00 5.00 1.41 1.50 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 6,700.00 1.00 1.40 0.85 C R600 - 300 VARIOUS LOCATIONS IN REGION 6 09/27/07 3,000.00 2.00 2.84 2.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 24,311.00 1.56 1.65 1.43 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 4,300.00 2.00 2.32 1.30 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 15,000.00 1.50 1.46 1.30 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 600.00 2.80 1.96 1.77 CC 0821-084 SH82 ASPEN 12/20/07 9,161.00 4.00 1.15 1.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 29,061.00 2.39 1.57 1.22 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 204,813.00 1.48 1.40 1.32 =============== 202-00400 Rem Bridge Each =================================================== NH 0405-025 KIT CARSON BRIDGE 04/26/07 1.00 152399.16 98877.64 75000.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 25 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00400 Rem Bridge Each =================================================== BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 2.00 50000.00 39359.02 32768.50 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 4.00 30000.00 86845.56 87508.75 BR 059A-032 ON SH 59 IN SEDGWICK COUNTY 06/07/07 1.00 15000.00 31962.36 25000.00 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 1.00 25000.00 43641.32 39102.22 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 9.00 45822.13 59968.85 61630.47 BR 0253-192 I-25&128TH 08/16/07 1.00 75000.00 112774.22 100000.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 1.00 900000.00 534425.66 400000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 487500.00 300174.86 250000.00 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 1.00 104000.00 121197.64 158000.00 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 1.00 110000.00 168666.67 103400.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 1.00 125000.00 168624.54 140000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 113000.00 151164.78 133800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 123314.23 111896.54 104005.30 =============== 202-00425 Rem Bridge Railing Lin Foot =============================================== STA 0961-012 SH 96, OVERLAY IN PUEBLO 01/04/07 34.00 64.00 36.11 11.55 STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 1,670.00 11.00 6.78 7.10 STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 283.00 12.00 12.95 13.50 STA 069A-021 SH 69, W. OF WALSENBURG 01/25/07 526.00 10.00 10.08 10.40 NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 128.00 12.00 7.00 7.60 IM 0253-194 ON I-25 IN WELD COUNTY 01/25/07 364.00 9.50 6.00 6.00 NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 277.00 10.00 5.75 5.75 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 1,493.00 10.00 7.04 7.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,775.00 10.87 7.81 7.85 SHE 0251-175 ALONG I 25 NORTH OF THE CITY 04/26/07 472.00 9.50 6.18 4.95 NH 3851-016 US 385 NORTH OF BURLINGTON 05/24/07 200.00 11.66 6.73 7.20 NH0341-071 US 34: GARFIELD TO MORNING DR 06/14/07 43.00 7.60 10.17 10.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 715.00 9.99 6.45 5.91 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 26 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00425 Rem Bridge Railing Lin Foot =============================================== C0701-187 I-70 20 ROAD BRIDGE REPAIR 09/06/07 434.00 12.00 19.60 8.50 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 442.00 10.00 19.75 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 876.00 10.99 19.67 11.78 STA 340A-013 SH 340 IN FRUITA 10/25/07 438.00 10.00 10.81 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 438.00 10.00 10.81 9.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,804.00 10.74 9.31 8.23 =============== 202-00450 Rem Port Present Str (1) Sq Yard ================================================ STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 3.00 300.00 633.83 525.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 300.00 633.83 525.00 STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 644.00 52.33 31.35 25.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 644.00 52.33 31.35 25.10 C0703-338 CLEAR CREEK COUNTY 12/05/07 17.50 400.00 415.67 415.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 17.50 400.00 415.67 415.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 664.50 62.60 54.18 37.63 =============== 202-00453 Rem Port Present Str (2) Sq Yard ================================================ STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 22.50 180.00 179.67 90.00 BR 109A-018 SH 109 LA JUNTA, SH50, MANZI 01/11/07 1,127.00 175.00 123.63 100.25 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 27 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00453 Rem Port Present Str (2) Sq Yard ================================================ NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 883.00 165.00 160.00 45.00 IM 0253-194 ON I-25 IN WELD COUNTY 01/25/07 5.00 1000.00 653.33 710.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,037.50 172.75 149.35 77.69 STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 32.00 174.91 244.65 234.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 32.00 174.91 244.65 234.30 C R600 - 300 VARIOUS LOCATIONS IN REGION 6 09/27/07 1,753.00 155.00 197.40 145.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,753.00 155.00 197.40 145.00 C0703-338 CLEAR CREEK COUNTY 12/05/07 3.50 500.00 926.67 430.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.50 500.00 926.67 430.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,826.00 164.93 177.20 110.16 =============== 202-00454 Rem Port Present Str (2A) Sq Yard ================================================ STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 5.00 275.00 785.00 625.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 275.00 785.00 625.00 C0703-338 CLEAR CREEK COUNTY 12/05/07 3.50 500.00 860.00 430.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.50 500.00 860.00 430.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.50 367.65 804.44 544.71 =============== 202-00460 Rem Port Present Str (3) Sq Yard ================================================ BR 109A-018 SH 109 LA JUNTA, SH50, MANZI 01/11/07 250.00 200.00 153.50 77.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 28 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00460 Rem Port Present Str (3) Sq Yard ================================================ NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 44.00 400.00 375.00 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 294.00 229.93 221.18 81.94 STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 7.00 510.04 589.50 569.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7.00 510.04 589.50 569.00 C R600 - 300 VARIOUS LOCATIONS IN REGION 6 09/27/07 90.00 350.00 363.60 292.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 90.00 350.00 363.60 292.00 C0703-338 CLEAR CREEK COUNTY 12/05/07 5.30 600.00 1318.33 555.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.30 600.00 1318.33 555.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 396.30 267.10 293.43 144.57 =============== 202-00462 Rem Port Present Str (3A) Sq Yard ================================================ C0703-338 CLEAR CREEK COUNTY 12/05/07 5.30 600.00 1091.67 555.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.30 600.00 1091.67 555.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.30 600.00 1091.67 555.00 =============== 202-00495 Rem Port Present Str LUMP SUM =============================================== BR 109A-018 SH 109 LA JUNTA, SH50, MANZI 01/11/07 1.00 97500.00 72081.31 66662.63 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 97500.00 72081.31 66662.63 NH 0405-025 KIT CARSON BRIDGE 04/26/07 1.00 15166.37 7336.68 10000.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 29 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00495 Rem Port Present Str LUMP SUM =============================================== STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 1.00 15000.00 12066.67 17000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 15083.19 9363.82 13500.00 C0701-190 26.5 ROAD/I-70 BRIDGE REPAIR 08/27/07 1.00 19500.00 28166.67 19500.00 C0701-187 I-70 20 ROAD BRIDGE REPAIR 09/06/07 1.00 5000.00 27820.00 9000.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 1.00 125000.00 40500.38 57000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 49833.33 32133.46 28500.00 BR 0241-047 US 24, 2 MI S OF GRANITE, CHA 11/15/07 1.00 20000.00 21974.95 33800.62 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 20000.00 21974.95 33800.62 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 49333.30 29524.94 34953.23 =============== 202-00500 Rem Port Present Str Each =================================================== SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 1.00 8000.00 6325.80 2731.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 8000.00 6325.80 2731.00 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 1.00 12325.00 3892.47 4200.00 STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 10.00 2500.00 4854.17 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 11.00 3393.18 4753.69 4927.27 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 3777.08 4957.86 4744.25 =============== 202-00502 Rem Port Present Str Cubic Yard ============================================= NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 6.00 1500.00 1485.00 750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 1500.00 1485.00 750.00 STA 340A-013 SH 340 IN FRUITA 10/25/07 15.00 775.00 1131.25 550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 15.00 775.00 1131.25 550.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21.00 982.14 1249.17 607.14 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 30 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00503 Rem Port Present Str Sq Yard ================================================ BR 109A-018 SH 109 LA JUNTA, SH50, MANZI 01/11/07 20.40 1000.00 1430.00 2000.00 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 133.00 350.00 312.67 310.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 153.40 436.44 367.01 534.75 C0701-187 I-70 20 ROAD BRIDGE REPAIR 09/06/07 711.00 250.00 163.60 176.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 890.00 100.00 100.00 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,601.00 166.61 131.78 122.63 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,754.40 190.21 156.59 158.67 =============== 202-00504 Rem Exp Device Lin Foot =============================================== IM 0702-269 I 70 IN EAGLE COUNTY 01/11/07 447.00 88.00 112.50 75.00 IM 0702-270 I 70 THROUGH GLENWOOD CANYON 01/11/07 256.00 200.00 98.30 98.00 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 648.00 125.00 35.20 55.00 IM0252-388 I-25 LARKSPUR INTERCHANGE NOR 03/08/07 87.00 20.00 323.30 120.45 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 159.20 50.00 66.33 29.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,597.20 113.47 75.83 68.46 STA 340A-013 SH 340 IN FRUITA 10/25/07 4.00 90.00 78.81 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 90.00 78.81 55.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,601.20 113.41 75.84 68.43 =============== 202-00520 Rem of Exp Joint Matl Lin Foot =============================================== BR 109A-018 SH 109 LA JUNTA, SH50, MANZI 01/11/07 510.00 40.00 47.50 47.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 510.00 40.00 47.50 47.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 510.00 40.00 47.50 47.00 =============== 202-00700 Rem Light Standard Each =================================================== SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 2.00 375.00 409.29 365.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 31 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00700 Rem Light Standard Each =================================================== STA402A-007 SH 402 & I-25 OFFRAMS AND E. 03/22/07 5.00 300.00 377.50 225.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7.00 321.43 393.40 265.14 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 2.00 350.00 728.88 940.50 CR400-216 SIGNALS @ US34 & SH37, KERSEY 05/24/07 4.00 300.00 675.00 500.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 3.00 300.00 414.58 375.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 9.00 311.11 578.78 556.22 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 26.00 330.00 621.11 631.50 ITSSW00-455 VMS REPLACEMENT IN REGIONS 1, 08/30/07 3.00 800.00 937.50 900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 29.00 378.62 638.37 659.28 STA 340A-013 SH 340 IN FRUITA 10/25/07 16.00 325.00 275.00 290.00 CC 0821-084 SH82 ASPEN 12/20/07 2.00 750.00 471.33 440.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 18.00 372.22 306.00 306.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 63.00 360.79 493.77 500.02 =============== 202-00710 Rem Power Pole Each =================================================== HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 1.00 400.00 1176.14 572.13 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 400.00 1176.14 572.13 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 400.00 1176.14 572.13 =============== 202-00750 Rem Luminaire Each =================================================== NH 1602-102 WITHIN THE ALAMOSA CITY LIMIT 02/15/07 1.00 400.00 873.00 246.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 400.00 873.00 246.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 32 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00750 Rem Luminaire Each =================================================== SHE 082A-010 SH 82 AND BUFFALO VALLEY ROAD 11/29/07 1.00 119.00 859.00 1356.00 CC 0821-084 SH82 ASPEN 12/20/07 2.00 250.00 368.00 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 206.33 490.75 488.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 254.75 533.22 428.00 =============== 202-00800 Rem Overpass Mtd Sign Brkt Each =================================================== BR 0253-192 I-25&128TH 08/16/07 1.00 500.00 1721.81 1315.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 500.00 1721.81 1315.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 500.00 1721.81 1315.00 =============== 202-00805 Rem Overhead Sign Str Each =================================================== ITSSW00-378 VMS REPLACEMENT IN REGIONS 1, 06/21/07 5.00 8000.00 6366.63 1903.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 8000.00 6366.63 1903.90 ITSSW00-455 VMS REPLACEMENT IN REGIONS 1, 08/30/07 3.00 4000.00 7100.00 9700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 4000.00 7100.00 9700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 6500.00 6576.17 4827.44 =============== 202-00810 Rem Ground Sign Each =================================================== STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 7.00 75.00 42.28 26.00 NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 4.00 20.00 52.38 22.00 STA 012A-042 SH 12, S. OF LA VETA 01/18/07 178.00 70.00 51.00 38.00 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 1.00 75.00 110.60 250.00 STA 069A-021 SH 69, W. OF WALSENBURG 01/25/07 46.00 70.00 34.63 35.00 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 1.00 54.00 79.71 70.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 33 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00810 Rem Ground Sign Each =================================================== NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 5.00 35.00 33.89 25.80 NH 1602-102 WITHIN THE ALAMOSA CITY LIMIT 02/15/07 3.00 150.00 138.00 176.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 75.00 55.00 144.42 135.00 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 9.00 40.00 68.50 89.00 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 24.00 80.00 39.54 22.00 SHE 1151-018 SH 115 - GUMAER AVENUE EAST 03/08/07 1.00 100.00 155.65 200.00 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 39.00 70.00 44.00 55.00 SHE 0504-050 INTERSECTION OF SH 50B AND SH 03/22/07 3.00 70.00 168.03 94.88 STA402A-007 SH 402 & I-25 OFFRAMS AND E. 03/22/07 6.00 50.00 105.00 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 402.00 66.63 59.67 59.49 SHE 165A-011 ALONG SH 165 N/O RYE 04/05/07 43.00 50.00 74.49 80.00 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 3.00 105.34 78.81 80.00 NH 0405-025 KIT CARSON BRIDGE 04/26/07 9.00 59.44 53.62 55.00 STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 9.00 58.98 90.10 67.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 97.00 80.00 98.27 158.06 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 1.00 75.00 28.92 29.00 NH 3851-016 US 385 NORTH OF BURLINGTON 05/24/07 4.00 79.22 240.67 77.00 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 2.00 100.00 525.00 500.00 BR 059A-032 ON SH 59 IN SEDGWICK COUNTY 06/07/07 1.00 100.00 115.63 70.00 IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 15.00 60.00 55.00 55.00 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 1.00 200.00 88.25 20.00 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 2.00 50.00 73.33 60.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 11.00 60.00 104.33 110.00 ITSSW00-378 VMS REPLACEMENT IN REGIONS 1, 06/21/07 2.00 1500.00 2922.45 610.35 CR600-285 VARIOUS LOCATIONS IN REGION 6 06/28/07 9.00 500.00 1266.67 2200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 209.00 102.12 153.08 213.94 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 6.00 75.00 83.10 80.00 BR 0253-192 I-25&128TH 08/16/07 8.00 75.00 64.26 66.00 CR100-126 WEST OF KIT CARSON 08/16/07 20.00 50.71 97.21 70.00 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 1.00 150.00 105.56 100.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 19.00 85.00 102.13 101.00 ITSSW00-455 VMS REPLACEMENT IN REGIONS 1, 08/30/07 7.00 1000.00 2810.00 3400.00 IM 0703-331 WB I-70 AT M.P. 259.70 AND M. 09/06/07 1.00 80.00 421.64 496.57 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 4.00 65.00 74.50 52.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 66.00 169.23 240.58 438.36 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 2.00 45.00 82.77 55.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 34 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00810 Rem Ground Sign Each =================================================== STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 2.00 70.00 79.20 86.78 STA 340A-013 SH 340 IN FRUITA 10/25/07 39.00 80.00 133.84 85.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 34.00 55.75 74.80 80.00 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 1.00 75.00 208.92 71.47 SHE 082A-010 SH 82 AND BUFFALO VALLEY ROAD 11/29/07 1.00 100.00 54.38 60.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 1.00 75.00 87.39 50.00 CC 0821-084 SH82 ASPEN 12/20/07 18.00 65.00 97.83 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 98.00 68.02 96.83 76.43 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 775.00 85.11 97.16 135.55 =============== 202-00815 Rem of Sign (Special) Each =================================================== STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 1.00 1000.00 2605.67 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 1000.00 2605.67 1100.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 3.00 7500.00 2338.88 3943.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 7500.00 2338.88 3943.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 5875.00 2392.23 3232.25 =============== 202-00818 Rem Steel Sign Ground Stub base (36 In) Each =================================================== NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 1.00 215.00 191.67 270.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 215.00 191.67 270.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 215.00 191.67 270.00 =============== 202-00821 Rem Sign Panel Each =================================================== NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 13.00 75.00 39.13 11.00 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 1.00 36.00 78.96 80.00 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 20.00 75.00 12.05 10.30 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 53.00 33.00 32.58 27.00 IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 15.00 50.00 41.43 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 102.00 49.12 29.86 22.65 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 35 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00821 Rem Sign Panel Each =================================================== SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 2.00 40.00 145.95 159.80 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 7.00 40.00 65.99 75.50 IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 2.00 70.00 47.50 55.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 1.00 20.00 72.33 53.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12.00 43.33 75.13 84.26 BR 0253-192 I-25&128TH 08/16/07 2.00 30.00 40.62 38.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 30.00 40.62 38.00 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 2.00 60.00 82.83 83.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 9.00 78.75 46.86 26.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 11.00 75.34 55.28 36.36 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 127.00 50.54 38.27 29.90 =============== 202-00823 Rem Dynamic Message Sign Each =================================================== ITSSW00-378 VMS REPLACEMENT IN REGIONS 1, 06/21/07 1.00 2500.00 4764.57 3814.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 2500.00 4764.57 3814.70 ITSSW00-455 VMS REPLACEMENT IN REGIONS 1, 08/30/07 2.00 2500.00 3875.00 2900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 2500.00 3875.00 2900.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 2500.00 4256.24 3204.90 =============== 202-00825 Rem Flashing Beacon Each =================================================== NH 0405-025 KIT CARSON BRIDGE 04/26/07 1.00 474.60 311.50 380.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 36 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00825 Rem Flashing Beacon Each =================================================== CR400-216 SIGNALS @ US34 & SH37, KERSEY 05/24/07 4.00 250.00 575.00 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 294.92 487.17 316.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 294.92 487.17 316.00 =============== 202-00827 Rem of Pull Box Each =================================================== SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 2.00 150.00 63.56 52.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 150.00 63.56 52.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 150.00 63.56 52.00 =============== 202-00828 Rem Traf Sig Equipment LUMP SUM =============================================== SHE 0931-027 SH 93 @ SH 72 01/25/07 1.00 1500.00 3600.72 3100.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 1.00 16000.00 18313.83 17280.00 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 1.00 4000.00 2787.50 3130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 7166.67 5952.82 7836.67 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 1.00 5000.00 7585.74 3909.46 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 1.00 10000.00 13714.50 8500.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 1.00 6000.00 5530.00 7100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 7000.00 9253.72 6503.15 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 1.00 4500.00 4867.34 4798.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 1.00 2500.00 4915.00 5200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 3500.00 4888.52 4999.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 1.00 6260.00 6151.25 6200.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 1.00 5000.00 747.63 700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 5630.00 3835.41 3450.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 6076.00 5894.57 5991.75 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 37 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00831 Rem Traf Sig Head Each =================================================== NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 1.00 100.00 59.92 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 100.00 59.92 60.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 100.00 59.92 60.00 =============== 202-00840 Rem Traf Sig Pole Each =================================================== SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 2.00 1100.00 2017.50 1850.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1100.00 2017.50 1850.00 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 6.00 1200.00 1635.50 1332.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 1200.00 1635.50 1332.00 SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 2.00 1430.00 800.00 800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 1430.00 800.00 800.00 STSR400-229 SH 14, SH 93, & SH 157 IN BOU 12/06/07 15.00 1100.00 1468.40 1121.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 2.00 1500.00 4359.08 4000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 17.00 1147.06 1867.11 1459.71 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 27.00 1176.30 1831.89 1411.37 =============== 202-00848 Rem Traf Sig Control+Cab Each =================================================== SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 1.00 750.00 300.00 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 750.00 300.00 300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 750.00 300.00 300.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 38 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00858 Rem Pedestal Pole Each =================================================== NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 1.00 300.00 33.15 33.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 300.00 33.15 33.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 300.00 33.15 33.00 =============== 202-00895 Rem of Impact Attenuator Each =================================================== IM 0702-270 I 70 THROUGH GLENWOOD CANYON 01/11/07 1.00 1500.00 1320.00 540.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1500.00 1320.00 540.00 IM0703-317 FROM MP 221.30 TO MP 251.30 J 05/17/07 3.00 1299.05 1283.33 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 1299.05 1283.33 2000.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 1.00 1400.00 3100.00 3300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1400.00 3100.00 3300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 1359.43 1744.38 1968.00 =============== 202-00900 Rem Conc Footing Each =================================================== IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 3.00 300.00 327.47 321.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 300.00 327.47 321.00 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 2.00 500.00 733.34 800.00 IM 0703-331 WB I-70 AT M.P. 259.70 AND M. 09/06/07 2.00 300.00 511.87 772.47 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 400.00 585.69 786.24 STA 340A-013 SH 340 IN FRUITA 10/25/07 20.00 185.00 241.25 320.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 20.00 185.00 241.25 320.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 27.00 229.63 290.94 389.18 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 39 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00950 Rem Conc Found/Slab Sq Yard ================================================ STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 27.50 100.00 108.83 52.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 27.50 100.00 108.83 52.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 27.50 100.00 108.83 52.50 =============== 202-01000 Rem Fence Lin Foot =============================================== NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 70,552.00 0.55 0.20 0.20 STA 0661-009 ON SH 66 IN WELD COUNTY 02/01/07 909.00 1.50 1.35 0.75 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 1,458.00 3.20 3.92 5.00 SHE 5502-054 02/22/07 2,210.00 3.00 3.03 1.10 IM0252-388 I-25 LARKSPUR INTERCHANGE NOR 03/08/07 335.00 2.00 3.71 2.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 75,464.00 0.69 0.90 0.33 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 7,650.00 0.75 0.48 0.50 NH 0405-025 KIT CARSON BRIDGE 04/26/07 6,248.00 0.73 0.40 0.25 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 6,205.00 0.90 0.68 0.60 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 40,887.00 0.65 0.35 0.36 STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 2,292.00 1.00 0.89 0.55 BR 059A-032 ON SH 59 IN SEDGWICK COUNTY 06/07/07 181.00 1.00 3.25 3.00 IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 1,650.00 3.00 2.25 2.50 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 161.00 5.00 4.27 4.00 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 445.00 3.00 3.62 3.33 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 65,719.00 0.79 0.52 0.49 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 3,721.00 1.00 0.83 0.70 SHE 0702-267 NEAR VAIL IN EAGLE COUNTY 08/02/07 108,780.00 1.48 0.82 1.25 BR 0253-192 I-25&128TH 08/16/07 426.00 3.00 1.85 2.15 CR100-126 WEST OF KIT CARSON 08/16/07 39,379.00 0.40 0.26 0.20 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 1,731.00 2.50 0.60 0.50 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 768.00 1.00 2.03 2.40 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 32.00 25.00 27.38 23.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 154,837.00 1.21 0.71 0.97 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 627.00 1.00 1.68 0.72 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 40 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01000 Rem Fence Lin Foot =============================================== STA 340A-013 SH 340 IN FRUITA 10/25/07 2,638.00 1.30 1.40 1.50 C 0504-055 PUEBLO COUNTY, US-50C AT SALT 11/01/07 405.00 2.00 7.50 11.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 2,423.00 3.25 2.02 0.65 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 255.00 1.50 2.63 2.31 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6,348.00 2.07 2.03 1.74 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 302,368.00 1.01 0.72 0.72 =============== 202-01030 Rem of Road Closure Gate Each =================================================== NH 0405-025 KIT CARSON BRIDGE 04/26/07 1.00 344.63 453.06 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 344.63 453.06 300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 344.63 453.06 300.00 =============== 202-01130 Rem Gdrail Ty 3 Lin Foot =============================================== STA 0961-012 SH 96, OVERLAY IN PUEBLO 01/04/07 266.00 6.00 4.06 3.90 STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 1,334.00 3.00 2.18 2.10 STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 251.00 5.00 2.58 2.50 BR 109A-018 SH 109 LA JUNTA, SH50, MANZI 01/11/07 84.00 9.00 7.75 7.50 STA 012A-042 SH 12, S. OF LA VETA 01/18/07 111.00 4.00 5.72 2.00 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 547.00 3.00 3.45 3.50 STA 069A-021 SH 69, W. OF WALSENBURG 01/25/07 1,362.50 4.00 2.98 2.25 NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 2,430.00 3.50 2.75 3.05 IM 0253-194 ON I-25 IN WELD COUNTY 01/25/07 3,167.00 2.50 3.08 3.00 NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 182.00 3.30 6.00 6.00 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 1,600.00 3.00 2.23 2.00 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 22,172.00 1.70 1.87 1.62 IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 800.00 3.50 2.57 2.45 SHE 0504-050 INTERSECTION OF SH 50B AND SH 03/22/07 408.00 3.00 4.16 3.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 34,714.50 2.27 2.30 2.04 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 575.00 4.16 2.53 3.00 NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 4,676.00 3.00 2.94 2.90 NH 0405-025 KIT CARSON BRIDGE 04/26/07 858.00 3.64 2.28 2.50 SHE 0251-175 ALONG I 25 NORTH OF THE CITY 04/26/07 400.00 3.00 1.96 1.70 STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 1,035.00 3.46 2.75 2.05 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 41 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01130 Rem Gdrail Ty 3 Lin Foot =============================================== SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 954.00 3.50 3.59 3.45 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 7,113.00 2.00 2.03 2.12 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 3,529.00 4.00 2.22 2.00 NH 3851-016 US 385 NORTH OF BURLINGTON 05/24/07 820.00 3.66 3.05 2.05 SHE 133A-032 SH 133 BETWEEN REDSTONE AND M 05/24/07 121.00 6.00 3.95 3.00 NH0341-071 US 34: GARFIELD TO MORNING DR 06/14/07 1,264.00 3.20 2.53 2.60 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 875.00 2.75 2.33 2.00 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 925.00 3.10 3.16 3.26 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 441.00 3.50 4.55 4.25 ITSSW00-378 VMS REPLACEMENT IN REGIONS 1, 06/21/07 540.00 7.00 11.97 14.90 CR600-285 VARIOUS LOCATIONS IN REGION 6 06/28/07 337.50 5.00 3.62 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 24,463.50 3.11 2.64 2.75 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 450.00 5.00 3.15 3.89 BR 0253-192 I-25&128TH 08/16/07 528.00 5.00 2.55 2.60 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 4,190.00 2.60 2.16 2.50 ITSSW00-455 VMS REPLACEMENT IN REGIONS 1, 08/30/07 200.00 20.00 3.84 4.00 C0701-187 I-70 20 ROAD BRIDGE REPAIR 09/06/07 100.00 10.00 22.40 4.00 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 824.00 2.50 4.16 3.75 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 601.00 2.00 8.13 7.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6,893.00 3.49 3.37 3.25 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 1,375.00 2.75 3.05 3.00 SHE0092-019 SH 9 NORTH OF SILVERTHORNE, I 10/18/07 4,050.00 3.00 2.40 1.70 STA 340A-013 SH 340 IN FRUITA 10/25/07 338.00 5.75 5.26 3.00 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 991.00 3.50 2.00 2.02 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 349.00 3.50 4.42 4.90 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 217.00 4.00 8.29 15.00 CC 0821-084 SH82 ASPEN 12/20/07 242.00 5.00 4.46 3.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 7,562.00 3.26 2.90 2.64 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 73,633.00 2.76 2.61 2.45 =============== 202-01140 Rem Gdrail Ty 4 Lin Foot =============================================== IM 0702-269 I 70 IN EAGLE COUNTY 01/11/07 3,461.00 12.00 31.50 18.00 IM 0702-270 I 70 THROUGH GLENWOOD CANYON 01/11/07 200.00 20.00 21.73 18.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 42 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01140 Rem Gdrail Ty 4 Lin Foot =============================================== IM0252-388 I-25 LARKSPUR INTERCHANGE NOR 03/08/07 2,480.00 10.00 7.91 7.55 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 500.00 12.00 17.00 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6,641.00 11.49 17.69 13.50 IM0703-317 FROM MP 221.30 TO MP 251.30 J 05/17/07 7.00 138.54 110.76 220.00 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 2,454.00 25.00 12.22 12.50 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 95.00 12.00 52.25 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,556.00 24.83 13.21 14.46 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 602.00 20.00 26.59 10.14 C0702-273 I-70 GLENWOOD CANYON 08/09/07 4,487.00 18.00 20.00 20.00 BR 0253-192 I-25&128TH 08/16/07 631.00 15.00 11.77 6.75 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 212.00 20.00 11.25 10.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 634.00 15.00 21.50 17.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6,566.00 17.67 20.38 17.21 SHE0092-019 SH 9 NORTH OF SILVERTHORNE, I 10/18/07 185.00 16.50 13.29 6.50 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 410.00 25.00 22.21 19.00 CC 0821-084 SH82 ASPEN 12/20/07 219.00 20.00 28.67 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 814.00 21.72 22.26 19.12 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16,577.00 16.50 17.41 15.39 =============== 202-01170 Rem Gdrail Ty 7 Lin Foot =============================================== IM 0702-270 I 70 THROUGH GLENWOOD CANYON 01/11/07 400.00 20.00 9.65 3.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 400.00 20.00 9.65 3.55 C0702-273 I-70 GLENWOOD CANYON 08/09/07 80.00 16.00 20.00 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 80.00 16.00 20.00 20.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 480.00 19.33 10.30 6.29 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 43 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01200 Rem Tensioned Cable Barrier Lin Foot =============================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 19,218.00 4.00 2.53 1.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 19,218.00 4.00 2.53 1.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19,218.00 4.00 2.53 1.60 =============== 202-01300 Rem End Anchorage Each =================================================== STA 0961-012 SH 96, OVERLAY IN PUEBLO 01/04/07 4.00 300.00 174.00 175.00 STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 12.00 150.00 118.00 117.00 IM 0702-269 I 70 IN EAGLE COUNTY 01/11/07 2.00 400.00 197.00 144.00 STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 2.00 200.00 108.78 96.00 STA 069A-021 SH 69, W. OF WALSENBURG 01/25/07 5.00 250.00 139.50 95.00 NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 6.00 200.00 126.58 130.00 IM 0253-194 ON I-25 IN WELD COUNTY 01/25/07 8.00 300.00 124.67 124.00 STA 1251-005 SH 125 AND 127 NORTH OF COWDR 02/08/07 6.00 180.00 541.17 600.00 NH 0402-070 US 40 ROUTT COUNTY 02/08/07 12.00 180.00 140.00 140.00 SHE 1151-020 SH 115 VMS, MP 17 AND MP 41 02/15/07 1.00 300.00 196.59 175.13 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 16.00 200.00 120.50 125.00 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 10.00 150.00 108.33 95.00 IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 3.00 200.00 152.18 145.00 SHE 0504-050 INTERSECTION OF SH 50B AND SH 03/22/07 2.00 360.00 167.22 142.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 89.00 209.10 169.21 156.82 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 2.00 303.58 149.90 150.00 NH 0405-025 KIT CARSON BRIDGE 04/26/07 4.00 201.92 134.92 150.00 STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 5.00 143.42 187.40 180.00 STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 8.00 185.00 92.20 88.60 IM0703-317 FROM MP 221.30 TO MP 251.30 J 05/17/07 7.00 228.81 180.00 220.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 14.00 300.00 109.11 106.42 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 5.00 250.00 160.59 176.00 NH 3851-016 US 385 NORTH OF BURLINGTON 05/24/07 8.00 140.80 139.00 130.00 SHE 133A-032 SH 133 BETWEEN REDSTONE AND M 05/24/07 2.00 180.00 121.25 144.00 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 2.00 400.00 300.00 400.00 NH0341-071 US 34: GARFIELD TO MORNING DR 06/14/07 4.00 150.00 128.33 130.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 8.00 160.00 122.81 105.00 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 3.00 203.56 168.02 163.13 CR600-285 VARIOUS LOCATIONS IN REGION 6 06/28/07 3.00 250.00 201.97 185.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 75.00 215.88 143.70 146.01 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 44 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01300 Rem End Anchorage Each =================================================== HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 2.00 250.00 191.81 282.02 BR 0253-192 I-25&128TH 08/16/07 4.00 200.00 155.74 155.00 C0701-190 26.5 ROAD/I-70 BRIDGE REPAIR 08/27/07 1.00 150.00 194.83 150.00 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 3.00 350.00 226.33 161.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 250.00 183.44 181.70 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 2.00 150.00 177.75 151.00 STA 340A-013 SH 340 IN FRUITA 10/25/07 4.00 300.00 155.50 162.00 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 4.00 125.00 277.52 154.16 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 200.00 224.63 156.66 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 184.00 213.59 164.31 153.76 =============== 202-04001 Plug Culvert Each =================================================== NH 1601-056 US 160 @ ROOSA AVE 08/23/07 2.00 1500.00 927.78 300.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 3.00 2000.00 732.13 1226.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 2.00 1750.00 909.50 960.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7.00 1785.71 823.86 885.43 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 1.00 1000.00 2174.10 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1000.00 2174.10 1200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 1687.50 1093.91 924.75 =============== 202-04002 Clean Culvert Each =================================================== NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 13.00 1000.00 1043.00 1000.00 NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 8.00 2750.00 610.00 610.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 21.00 1666.67 995.55 851.43 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 45 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-04002 Clean Culvert Each =================================================== STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 24.00 1500.00 1284.67 2500.00 SHE 0251-175 ALONG I 25 NORTH OF THE CITY 04/26/07 1.00 3000.00 1933.33 4340.00 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 2.00 1000.00 1139.50 1998.00 NH 3851-016 US 385 NORTH OF BURLINGTON 05/24/07 2.00 2990.43 1233.33 500.00 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 12.00 565.74 6798.33 8140.11 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 41.00 1311.46 3487.27 4073.59 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 3.00 1300.00 2858.25 2300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 1300.00 2858.25 2300.00 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 2.00 1000.00 1063.97 1900.00 BR R300-130 I-70 (VARIOUS LOCATIONS) 10/18/07 1.00 3000.00 3675.00 875.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 3.00 2000.00 1531.95 1825.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 1833.33 1442.03 1691.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 71.00 1460.14 2493.05 2844.33 =============== 202-04005 Clean Valve Box Each =================================================== NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 10.00 100.00 145.51 220.00 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 4.00 150.00 139.25 130.00 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 1.00 200.00 261.88 165.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15.00 120.00 153.38 192.33 NH 030A-025 SH30 (HAVANA)- PARKER TO FLOR 04/19/07 34.00 160.00 97.15 55.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 8.00 150.00 203.33 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 42.00 158.10 108.32 111.19 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 2.00 300.00 780.84 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 300.00 780.84 400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 59.00 153.22 145.21 141.61 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 46 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-04100 Abandon Well Each =================================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 1.00 1500.00 1928.13 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1500.00 1928.13 1500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1500.00 1928.13 1500.00 =============== 202-05006 Sawing Concrete (6 In) Lin Foot =============================================== CC 0821-084 SH82 ASPEN 12/20/07 112.00 10.00 13.83 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 112.00 10.00 13.83 20.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 112.00 10.00 13.83 20.00 =============== 202-05026 Sawing Asphalt Mat (6 In) Lin Foot =============================================== IM 0703-319 EJMT 24.9 KV SERVICE 01/25/07 700.00 9.00 3.72 2.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 700.00 9.00 3.72 2.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 700.00 9.00 3.72 2.30 =============== 202-05030 Sawing Asphalt Mat (10 In) Lin Foot =============================================== NH 0402-070 US 40 ROUTT COUNTY 02/08/07 3,492.00 3.00 3.13 3.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,492.00 3.00 3.13 3.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,492.00 3.00 3.13 3.25 =============== 202-05100 Sandblasting Reinf Steel Sq Yard ================================================ IM 0253-194 ON I-25 IN WELD COUNTY 01/25/07 65.00 25.00 31.17 9.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 65.00 25.00 31.17 9.50 STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 39.00 47.24 9.13 8.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 39.00 47.24 9.13 8.85 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 47 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-05100 Sandblasting Reinf Steel Sq Yard ================================================ C0703-338 CLEAR CREEK COUNTY 12/05/07 35.00 40.00 51.33 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 35.00 40.00 51.33 40.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 139.00 35.02 32.22 17.00 =============== 202-05150 Sandblasting Sq Foot ================================================ STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 45.00 30.00 13.71 9.50 BR 109A-018 SH 109 LA JUNTA, SH50, MANZI 01/11/07 7,486.00 1.00 0.80 1.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7,531.00 1.17 1.03 1.05 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 4,275.00 0.84 0.55 1.00 STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 5,800.00 1.20 0.53 0.50 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 52,622.00 0.75 0.43 0.40 IM 0253-196 I-25: 48TH AVE TO US 36 225: 05/31/07 25,471.00 0.60 0.56 0.50 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 25,500.00 0.50 0.50 0.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 113,668.00 0.69 0.48 0.47 CR100-126 WEST OF KIT CARSON 08/16/07 40,000.00 0.43 0.45 0.42 C0701-187 I-70 20 ROAD BRIDGE REPAIR 09/06/07 901.00 2.00 3.88 1.50 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 1,130.00 1.20 10.89 1.30 C R600 - 300 VARIOUS LOCATIONS IN REGION 6 09/27/07 6,660.00 1.00 1.42 0.52 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 48,691.00 0.55 0.92 0.47 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 169,890.00 0.67 0.62 0.50 =============== 202-06000 Rem Detour LUMP SUM =============================================== IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 1.00 30000.00 64962.70 25000.00 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 1.00 20000.00 31260.30 22259.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 25000.00 43515.72 23629.55 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 48 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-06000 Rem Detour LUMP SUM =============================================== CC 0821-084 SH82 ASPEN 12/20/07 1.00 3000.00 23026.28 40757.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 3000.00 23026.28 40757.70 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 17666.67 36284.15 29338.93 =============== 202-06520 Rem of Existing Wall Panels LUMP SUM =============================================== C0702-273 I-70 GLENWOOD CANYON 08/09/07 1.00 300000.00 180000.00 180000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 300000.00 180000.00 180000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 300000.00 180000.00 180000.00 =============== 202-07000 Oblit Old Road LUMP SUM =============================================== NH 0405-025 KIT CARSON BRIDGE 04/26/07 1.00 195000.00 219118.86 140000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 195000.00 219118.86 140000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 195000.00 219118.86 140000.00 =============== 203-00000 Uncl Excav Cubic Yard ============================================= IM 0702-270 I 70 THROUGH GLENWOOD CANYON 01/11/07 4,760.00 18.00 16.38 15.00 IM 0703-319 EJMT 24.9 KV SERVICE 01/25/07 930.00 25.00 63.49 68.48 NH 0402-070 US 40 ROUTT COUNTY 02/08/07 3,092.00 40.00 38.50 37.00 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 649.00 20.00 64.08 38.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9,431.00 26.04 33.10 29.10 BRR500-087 US 160 PAGOSA SPRINGS 07/12/07 22.00 50.00 66.50 93.00 SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 42.00 20.00 28.00 28.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 64.00 30.31 47.70 50.34 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 49 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00000 Uncl Excav Cubic Yard ============================================= BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 1,887.00 18.00 19.54 9.57 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 2,455.00 15.00 25.91 17.00 CC 0821-084 SH82 ASPEN 12/20/07 14,027.00 30.00 32.83 19.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 18,369.00 26.76 30.36 17.76 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 27,864.00 26.53 30.90 21.68 =============== 203-00010 Uncl Excav (CIP) Cubic Yard ============================================= NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 6.00 50.00 165.33 295.00 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 3,939.00 17.00 17.43 16.50 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 3,153.00 15.00 12.66 15.00 STA 086A-045 SH 86 - FRANKTOWN TO ELBERT C 02/01/07 712.00 17.00 21.38 31.00 NH 0062-023 SH 6, CLEAR CREEK CANYON 02/08/07 244.00 25.00 44.33 31.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 15,529.00 27.00 8.50 1.00 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 4,802.00 12.00 15.93 7.15 SHE 1151-018 SH 115 - GUMAER AVENUE EAST 03/08/07 138.00 24.00 44.33 50.00 SHE 0504-050 INTERSECTION OF SH 50B AND SH 03/22/07 1,730.00 12.00 15.25 8.97 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 30,253.00 20.95 13.95 7.14 SHE 165A-011 ALONG SH 165 N/O RYE 04/05/07 170.00 45.00 79.85 56.75 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 69,813.00 9.13 9.77 4.40 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 6,802.00 15.00 17.75 15.00 SHE 0251-175 ALONG I 25 NORTH OF THE CITY 04/26/07 600.00 20.00 34.87 28.72 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 513,545.00 5.75 5.82 5.04 SHE 133A-032 SH 133 BETWEEN REDSTONE AND M 05/24/07 321.00 30.00 64.75 63.00 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 656.00 30.00 37.25 42.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 591,907.00 6.32 6.78 5.19 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 31,969.00 18.00 14.75 10.06 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 12,517.00 9.00 10.48 7.00 SHE 0702-267 NEAR VAIL IN EAGLE COUNTY 08/02/07 4,045.00 6.95 23.79 7.00 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 638.00 50.00 42.14 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 49,169.00 15.22 14.60 9.55 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 50 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00010 Uncl Excav (CIP) Cubic Yard ============================================= C R400-217 SIGNALS @ SH66 & CR13 10/04/07 1,621.00 15.00 17.64 17.00 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 207.00 30.00 70.09 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,828.00 16.70 21.06 32.06 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 673,157.00 7.66 8.08 5.67 =============== 203-00060 Emb Matl (CIP) Cubic Yard ============================================= STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 1,516.00 20.00 23.52 17.00 STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 1,108.00 28.00 24.23 23.00 NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 943.00 10.00 19.88 10.00 STA 0661-009 ON SH 66 IN WELD COUNTY 02/01/07 2,564.00 25.00 15.26 10.00 HB 149A-023 SOUTH FORK TO CREEDE - SHOULD 02/08/07 3.00 90.00 549.00 700.00 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 450.00 25.00 46.02 30.30 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 1,285.00 14.00 26.53 17.80 SHE 1151-018 SH 115 - GUMAER AVENUE EAST 03/08/07 149.00 35.00 38.15 6.35 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 50.00 100.00 195.00 225.00 STA0091-030 SH 9 BETWEEN FAIRPLAY AND ALM 03/22/07 1,500.00 25.00 24.40 8.50 SHE 0504-050 INTERSECTION OF SH 50B AND SH 03/22/07 1,140.00 18.00 18.44 7.96 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10,708.00 21.72 22.41 14.84 NH 0405-025 KIT CARSON BRIDGE 04/26/07 246,196.00 7.48 5.20 3.80 STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 1,345.00 15.56 56.96 43.82 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 3,956.00 14.00 13.98 8.90 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 70,759.00 10.50 8.23 6.00 STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 38.00 71.54 58.35 41.70 IM0703-317 FROM MP 221.30 TO MP 251.30 J 05/17/07 13,466.00 10.34 22.17 18.00 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 5,560.00 15.00 12.54 11.00 SHE 133A-032 SH 133 BETWEEN REDSTONE AND M 05/24/07 1,360.00 25.00 116.75 126.00 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 314.00 30.00 47.50 55.00 STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 2,314.00 14.00 22.48 22.25 BR 059A-032 ON SH 59 IN SEDGWICK COUNTY 06/07/07 490.00 22.00 45.56 30.00 IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 6,840.00 16.00 32.50 20.00 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 8,980.00 14.00 15.58 13.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 32,717.00 7.00 11.82 4.50 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 4,395.00 15.00 15.25 13.50 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 4,221.00 22.00 27.29 19.08 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 402,951.00 8.92 8.68 6.34 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 51 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00060 Emb Matl (CIP) Cubic Yard ============================================= BR 0253-192 I-25&128TH 08/16/07 19,879.00 10.00 9.89 7.80 CR100-126 WEST OF KIT CARSON 08/16/07 36,968.00 11.09 11.21 9.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 34,163.00 15.00 18.83 13.00 IM 0703-331 WB I-70 AT M.P. 259.70 AND M. 09/06/07 1,400.00 20.00 21.33 24.47 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 6,167.00 8.00 36.28 9.60 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 1,613.00 70.00 56.50 29.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 100,190.00 13.09 15.36 10.70 BR R300-130 I-70 (VARIOUS LOCATIONS) 10/18/07 92.00 50.00 42.67 22.00 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 3,607.00 12.00 17.64 16.06 SHE0092-019 SH 9 NORTH OF SILVERTHORNE, I 10/18/07 420.00 37.75 52.04 54.90 STA 340A-013 SH 340 IN FRUITA 10/25/07 36,921.00 13.00 23.88 14.00 C 0504-055 PUEBLO COUNTY, US-50C AT SALT 11/01/07 959.00 23.00 76.67 32.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 14,319.00 21.00 26.03 21.00 BR0341-069 ON US 34 IN LARIMER COUNTY . . . 137.25 . BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 222.00 20.00 18.45 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 56,540.00 15.40 25.50 16.52 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 570,389.00 10.54 12.08 8.27 =============== 203-00062 Emb Matl (CIP) (Spec) Cubic Yard ============================================= STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 1,318.00 20.00 15.48 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,318.00 20.00 15.48 14.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 251,450.00 11.50 9.83 6.87 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 251,450.00 11.50 9.83 6.87 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 1,545.00 9.00 31.24 26.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,545.00 9.00 31.24 26.60 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 52 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00062 Emb Matl (CIP) (Spec) Cubic Yard ============================================= CC 0821-084 SH82 ASPEN 12/20/07 4,559.00 30.00 53.04 18.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,559.00 30.00 53.04 18.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 258,872.00 11.85 11.10 7.22 =============== 203-00100 Muck Excav Cubic Yard ============================================= NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 4,000.00 38.00 20.05 14.15 HB 065A-019 SH 65 THRU CEDAREDGE 03/08/07 11.00 100.00 74.50 50.00 STA0091-030 SH 9 BETWEEN FAIRPLAY AND ALM 03/22/07 100.00 40.00 39.84 26.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,111.00 38.21 21.12 14.54 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 1,000.00 15.89 17.38 15.00 NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 11.00 100.00 80.75 86.00 NH 0405-025 KIT CARSON BRIDGE 04/26/07 1,000.00 15.89 9.35 10.00 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 3,000.00 30.00 24.87 20.00 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 50.00 70.00 32.46 32.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 5,500.00 8.00 13.32 8.69 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 200.00 30.00 28.10 19.58 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10,761.00 16.39 16.66 12.94 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 1,000.00 30.00 17.68 11.13 CR100-126 WEST OF KIT CARSON 08/16/07 1,000.00 15.41 7.94 8.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 200.00 58.00 44.38 58.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,200.00 25.91 16.30 13.97 CC 0821-084 SH82 ASPEN 12/20/07 1,000.00 30.00 44.26 36.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,000.00 30.00 44.26 36.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18,072.00 23.27 19.55 14.74 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 53 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00210 Borrow (CIP) Cubic Yard ============================================= NH 3851-016 US 385 NORTH OF BURLINGTON 05/24/07 2,652.00 13.44 24.13 17.40 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 3,478.00 17.99 18.87 7.88 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6,130.00 16.02 20.52 12.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,130.00 16.02 20.52 12.00 =============== 203-00400 Rock Excav Cubic Yard ============================================= STA 1251-005 SH 125 AND 127 NORTH OF COWDR 02/08/07 5,200.00 40.00 56.17 47.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,200.00 40.00 56.17 47.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 30.00 340.00 269.00 380.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 30.00 340.00 269.00 380.00 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 2,393.00 31.00 28.13 27.51 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,393.00 31.00 28.13 27.51 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,623.00 38.36 50.23 42.19 =============== 203-00596 Rock Scaling LUMP SUM =============================================== STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 1.00 5000.00 21750.00 25000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 5000.00 21750.00 25000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5000.00 21750.00 25000.00 =============== 203-00598 Rock Scaling Hour =================================================== NH 5502-055 COALBANK PASS 08/09/07 65.00 500.00 462.50 425.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 65.00 500.00 462.50 425.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 54 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00598 Rock Scaling Hour =================================================== STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 60.00 200.00 78.75 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 60.00 200.00 78.75 60.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 125.00 356.00 213.58 249.80 =============== 203-00840 Polystyrene Fill Cubic Yard ============================================= NH 0405-025 KIT CARSON BRIDGE 04/26/07 68.00 120.00 435.48 450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 68.00 120.00 435.48 450.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 68.00 120.00 435.48 450.00 =============== 203-01100 Proof Rolling Hour =================================================== NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 40.00 130.00 114.92 55.00 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 15.00 110.00 135.13 92.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 55.00 124.55 125.02 65.09 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 10.00 113.27 141.39 125.00 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 30.00 120.00 136.00 115.00 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 10.00 115.00 131.71 157.00 STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 20.00 100.60 87.58 89.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 500.00 120.00 131.30 89.18 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 10.00 110.00 115.00 175.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 20.00 120.00 117.63 60.00 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 10.00 130.00 121.65 94.52 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 610.00 119.17 130.13 92.68 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 40.00 130.00 139.41 125.00 C065A-020 SH65 GRAND MESA SLIDE REPAIR 07/26/07 10.00 140.00 158.33 165.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 55 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01100 Proof Rolling Hour =================================================== C0701-190 26.5 ROAD/I-70 BRIDGE REPAIR 08/27/07 10.00 160.00 227.67 160.00 IM 0703-331 WB I-70 AT M.P. 259.70 AND M. 09/06/07 8.00 120.00 118.86 100.42 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 10.00 85.00 136.38 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 78.00 128.33 146.75 130.17 STA 340A-013 SH 340 IN FRUITA 10/25/07 10.00 170.00 115.25 103.00 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 10.00 115.00 115.42 89.22 CC 0821-084 SH82 ASPEN 12/20/07 10.00 200.00 110.83 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 30.00 161.67 113.76 85.74 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 773.00 122.13 130.60 94.23 =============== 203-01140 Rolling Hour =================================================== IM 0702-269 I 70 IN EAGLE COUNTY 01/11/07 20.00 100.00 108.00 91.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 40.00 150.00 117.58 70.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 60.00 133.33 115.19 77.00 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 10.00 120.00 170.33 125.00 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 20.00 130.00 112.50 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 30.00 126.67 137.29 91.67 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 16.00 100.00 108.24 97.69 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 10.00 150.00 102.37 100.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 20.00 1000.00 155.00 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 46.00 502.17 124.13 116.59 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 136.00 256.62 123.02 93.63 =============== 203-01200 Roadway Insulation Mat (2 In) Sq Foot ================================================ NH 0402-070 US 40 ROUTT COUNTY 02/08/07 51,370.00 3.00 1.75 1.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 51,370.00 3.00 1.75 1.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 51,370.00 3.00 1.75 1.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 56 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01500 Blading Hour =================================================== HB 0063-021 US 6: RIFLE TO NEW CASTLE 01/04/07 30.00 140.00 117.75 85.50 STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 150.00 120.00 100.82 85.00 IM 0702-269 I 70 IN EAGLE COUNTY 01/11/07 20.00 140.00 133.00 116.00 IM 0702-270 I 70 THROUGH GLENWOOD CANYON 01/11/07 20.00 120.00 116.67 110.00 STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 20.00 140.00 116.87 95.00 NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 20.00 120.00 127.32 120.00 STA 012A-042 SH 12, S. OF LA VETA 01/18/07 150.00 130.00 101.17 95.00 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 100.00 110.00 115.00 100.00 STA 069A-021 SH 69, W. OF WALSENBURG 01/25/07 150.00 130.00 82.50 10.00 NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 33.00 135.00 135.73 125.00 IM 0253-194 ON I-25 IN WELD COUNTY 01/25/07 5.00 150.00 216.67 100.00 NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 50.00 110.00 130.00 130.00 STA 0661-009 ON SH 66 IN WELD COUNTY 02/01/07 45.00 100.00 115.85 125.00 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 10.00 120.00 126.67 90.00 STA 086A-045 SH 86 - FRANKTOWN TO ELBERT C 02/01/07 10.00 130.00 153.40 110.00 NH 0062-023 SH 6, CLEAR CREEK CANYON 02/08/07 40.00 140.00 163.00 130.00 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 20.00 120.00 126.08 124.15 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 40.00 150.00 145.67 105.00 IM0252-388 I-25 LARKSPUR INTERCHANGE NOR 03/08/07 10.00 150.00 136.50 105.00 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 20.00 140.00 135.31 134.50 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 150.00 140.00 101.00 90.00 HB 065A-019 SH 65 THRU CEDAREDGE 03/08/07 40.00 130.00 114.17 100.00 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 20.00 150.00 133.33 130.00 STA0091-030 SH 9 BETWEEN FAIRPLAY AND ALM 03/22/07 50.00 150.00 128.20 85.00 IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 10.00 120.00 132.24 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,213.00 129.02 112.13 90.57 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 50.00 98.86 147.17 175.00 NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 40.00 130.00 107.75 129.00 NH 0405-025 KIT CARSON BRIDGE 04/26/07 25.00 120.41 150.43 165.00 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 60.00 135.00 198.33 150.00 SHE 0251-175 ALONG I 25 NORTH OF THE CITY 04/26/07 20.00 130.00 131.92 141.75 STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 80.00 91.12 159.00 140.00 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 60.00 120.00 115.38 133.50 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 50.00 120.00 159.67 175.00 STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 60.00 109.05 141.00 132.00 SHE0761-193 I-76: SHERIDAN TO I-25 (M.P. 05/17/07 100.00 125.00 143.54 185.20 IM0703-317 FROM MP 221.30 TO MP 251.30 J 05/17/07 30.00 112.41 206.67 250.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 190.00 165.00 163.65 109.10 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 25.00 120.00 137.82 139.00 NH 3851-016 US 385 NORTH OF BURLINGTON 05/24/07 20.00 147.86 110.00 105.00 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 20.00 150.00 137.50 125.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 57 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01500 Blading Hour =================================================== STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 200.00 100.00 98.83 80.00 BR 059A-032 ON SH 59 IN SEDGWICK COUNTY 06/07/07 20.00 125.00 164.75 100.00 IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 25.00 132.50 160.00 140.00 NH0341-071 US 34: GARFIELD TO MORNING DR 06/14/07 15.00 150.00 105.00 125.00 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 40.00 150.00 193.00 250.00 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 20.00 120.00 101.67 105.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 250.00 130.00 142.83 110.00 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 40.00 140.46 160.09 177.65 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 10.00 120.00 140.00 141.00 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 10.00 150.00 138.43 117.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,460.00 126.26 140.94 132.35 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 40.00 120.00 142.67 129.07 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 50.00 130.00 127.43 115.00 C065A-020 SH65 GRAND MESA SLIDE REPAIR 07/26/07 50.00 140.00 171.67 165.00 BR 0253-192 I-25&128TH 08/16/07 24.00 130.00 152.62 140.00 CR100-126 WEST OF KIT CARSON 08/16/07 175.00 103.37 110.00 100.00 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 10.00 160.00 132.07 150.00 C0701-190 26.5 ROAD/I-70 BRIDGE REPAIR 08/27/07 25.00 200.00 265.67 200.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 50.00 150.00 141.56 164.00 IM0703-323 GEORGETOWN HILL CHUTE 2 AND 3 08/30/07 20.00 145.33 140.00 130.00 C0701-187 I-70 20 ROAD BRIDGE REPAIR 09/06/07 10.00 150.00 228.40 125.00 IM 0703-331 WB I-70 AT M.P. 259.70 AND M. 09/06/07 20.00 150.00 153.81 137.22 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 20.00 200.00 187.88 210.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 494.00 131.61 140.90 132.63 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 60.00 120.00 106.20 110.00 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 25.00 130.00 147.64 105.56 SHE0092-019 SH 9 NORTH OF SILVERTHORNE, I 10/18/07 22.00 130.50 161.10 157.50 STA 340A-013 SH 340 IN FRUITA 10/25/07 100.00 160.00 151.00 120.00 C 0504-055 PUEBLO COUNTY, US-50C AT SALT 11/01/07 20.00 120.00 156.00 150.00 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 50.00 120.00 138.86 125.95 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 200.00 130.00 156.14 85.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 477.00 133.59 141.77 106.92 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,644.00 128.87 130.96 115.15 =============== 203-01510 Backhoe Hour =================================================== IM 0702-269 I 70 IN EAGLE COUNTY 01/11/07 20.00 120.00 126.50 78.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 58 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01510 Backhoe Hour =================================================== IM 0702-270 I 70 THROUGH GLENWOOD CANYON 01/11/07 20.00 130.00 97.00 91.00 HB 149A-023 SOUTH FORK TO CREEDE - SHOULD 02/08/07 8.00 150.00 228.33 200.00 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 20.00 175.00 165.00 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 68.00 142.65 142.72 117.35 STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 80.00 113.55 167.00 120.00 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 25.00 150.00 147.32 182.00 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 10.00 160.00 125.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 115.00 125.51 159.80 131.74 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 48.00 160.00 141.10 142.53 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 8.00 140.00 170.19 188.50 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 100.00 95.00 145.77 170.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 20.00 200.00 183.00 230.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 176.00 126.70 148.24 170.17 SHE0092-019 SH 9 NORTH OF SILVERTHORNE, I 10/18/07 20.00 123.50 115.50 110.25 C 0504-055 PUEBLO COUNTY, US-50C AT SALT 11/01/07 20.00 120.00 132.33 105.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 40.00 138.75 154.00 90.00 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 20.00 140.00 144.12 125.95 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 8.00 130.00 188.67 240.00 CC 0821-084 SH82 ASPEN 12/20/07 20.00 100.00 140.00 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 128.00 127.03 145.69 106.59 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 487.00 128.74 149.87 137.01 =============== 203-01515 Backhoe (Landscaping) Hour =================================================== NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 10.00 120.00 107.67 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 120.00 107.67 55.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 70.00 110.00 157.96 115.83 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 70.00 110.00 157.96 115.83 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 80.00 111.25 153.09 108.23 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 59 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01550 Dozing Hour =================================================== STA 0661-009 ON SH 66 IN WELD COUNTY 02/01/07 20.00 135.00 149.27 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 135.00 149.27 125.00 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 50.00 138.75 161.52 175.00 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 20.00 150.00 136.93 125.70 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 25.00 130.00 140.77 161.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 95.00 138.82 152.26 161.07 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 100.00 95.00 198.22 165.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 100.00 95.00 198.22 165.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 40.00 131.50 146.88 75.00 CC 0821-084 SH82 ASPEN 12/20/07 20.00 100.00 165.83 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 60.00 121.00 152.05 90.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 275.00 118.72 160.74 144.37 =============== 203-01555 Dozing (Landscaping) Hour =================================================== NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 10.00 200.00 124.83 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 200.00 124.83 100.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 120.00 165.00 160.64 126.07 BR 059A-032 ON SH 59 IN SEDGWICK COUNTY 06/07/07 8.00 150.00 159.75 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 128.00 164.06 160.54 126.00 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 20.00 150.00 136.95 125.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 20.00 150.00 136.95 125.95 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 158.00 164.56 154.41 124.35 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 60 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01582 Truck (Dump) Hour =================================================== IM 0702-270 I 70 THROUGH GLENWOOD CANYON 01/11/07 20.00 90.00 108.33 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 90.00 108.33 120.00 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 10.00 159.75 99.20 96.09 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 159.75 99.20 96.09 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 48.00 100.00 141.12 161.94 NH 5502-055 COALBANK PASS 08/09/07 80.00 100.00 130.00 138.00 IM0703-323 GEORGETOWN HILL CHUTE 2 AND 3 08/30/07 20.00 112.67 156.25 240.00 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 100.00 150.00 145.03 145.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 20.00 100.00 121.13 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 268.00 119.60 140.13 151.17 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 8.00 125.50 100.75 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8.00 125.50 100.75 110.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 306.00 119.13 134.63 146.25 =============== 203-01590 Front End Loader (Rubber) Hour =================================================== IM 0702-270 I 70 THROUGH GLENWOOD CANYON 01/11/07 20.00 130.00 131.67 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 130.00 131.67 120.00 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 20.00 113.94 130.56 141.67 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20.00 113.94 130.56 141.67 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 16.00 150.00 140.78 126.98 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 61 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01590 Front End Loader (Rubber) Hour =================================================== CR100-126 WEST OF KIT CARSON 08/16/07 120.00 119.32 103.75 100.00 IM0703-323 GEORGETOWN HILL CHUTE 2 AND 3 08/30/07 20.00 121.32 138.75 130.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 20.00 200.00 180.75 210.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 176.00 131.50 121.59 118.36 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 216.00 129.74 123.21 120.67 =============== 203-01594 Combination Loader Hour =================================================== HB 0063-021 US 6: RIFLE TO NEW CASTLE 01/04/07 20.00 150.00 91.55 75.30 HB 149A-023 SOUTH FORK TO CREEDE - SHOULD 02/08/07 41.00 200.00 205.00 200.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 40.00 130.00 115.17 65.00 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 40.00 150.00 103.33 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 141.00 158.87 129.24 122.74 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 40.00 125.00 136.00 115.00 STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 80.00 123.05 122.40 115.00 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 10.00 120.00 108.19 118.00 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 10.00 140.00 112.50 75.00 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 10.00 103.32 163.95 155.76 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 150.00 123.18 126.21 115.25 BRR500-087 US 160 PAGOSA SPRINGS 07/12/07 24.00 125.00 175.50 201.00 NH 5502-055 COALBANK PASS 08/09/07 80.00 125.00 143.75 137.50 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 20.00 180.00 118.03 115.00 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 100.00 175.00 126.48 95.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 224.00 152.23 135.20 123.32 BR R300-130 I-70 (VARIOUS LOCATIONS) 10/18/07 16.00 100.00 153.33 90.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 140.00 114.00 112.13 65.00 BR 0241-047 US 24, 2 MI S OF GRANITE, CHA 11/15/07 20.00 135.00 110.69 159.23 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 8.00 125.00 184.28 230.00 C0703-338 CLEAR CREEK COUNTY 12/05/07 10.00 100.00 182.67 195.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 62 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01594 Combination Loader Hour =================================================== SHE 160A-009 U.S. 160 MP 94.15 - MP 96.63 12/20/07 40.00 135.00 145.49 175.43 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 234.00 118.21 120.21 104.84 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 749.00 137.03 125.29 115.82 =============== 203-01597 Potholing Hour =================================================== STA 0961-012 SH 96, OVERLAY IN PUEBLO 01/04/07 50.00 180.00 187.00 175.00 NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 50.00 220.00 159.87 165.00 NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 5.00 200.00 143.33 150.00 SHE 0931-027 SH 93 @ SH 72 01/25/07 20.00 180.00 134.90 150.00 IM 0703-319 EJMT 24.9 KV SERVICE 01/25/07 16.00 150.00 230.77 197.62 STA 1251-005 SH 125 AND 127 NORTH OF COWDR 02/08/07 10.00 200.00 196.33 135.00 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 8.00 200.00 203.65 260.00 NH 1602-102 WITHIN THE ALAMOSA CITY LIMIT 02/15/07 24.00 150.00 137.50 125.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 140.00 215.00 218.33 220.00 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 60.00 200.00 210.75 156.00 IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 50.00 200.00 189.26 160.00 STA402A-007 SH 402 & I-25 OFFRAMS AND E. 03/22/07 30.00 175.00 160.38 131.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 463.00 197.73 191.21 178.07 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 20.00 166.46 213.95 175.00 NH 030A-025 SH30 (HAVANA)- PARKER TO FLOR 04/19/07 10.00 200.00 227.20 145.00 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 84.00 200.00 241.33 200.00 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 8.00 175.00 173.85 155.40 STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 10.00 242.12 290.50 186.00 SHE0761-193 I-76: SHERIDAN TO I-25 (M.P. 05/17/07 15.00 150.00 119.63 98.15 STA 0703-312 I-70 HIDDEN VALLEY AND FALL R 05/17/07 10.00 214.91 160.00 160.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 160.00 200.00 199.65 203.61 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 20.00 180.00 212.53 148.00 SHE 133A-032 SH 133 BETWEEN REDSTONE AND M 05/24/07 15.00 175.00 117.24 144.45 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 12.00 200.00 225.00 250.00 IM 0253-196 I-25: 48TH AVE TO US 36 225: 05/31/07 40.00 150.00 224.13 110.00 STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 15.00 175.00 123.33 125.00 BR 059A-032 ON SH 59 IN SEDGWICK COUNTY 06/07/07 8.00 175.00 201.00 125.00 IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 48.00 165.00 225.00 200.00 NH0341-071 US 34: GARFIELD TO MORNING DR 06/14/07 10.00 150.00 168.33 150.00 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 80.00 150.00 161.15 160.00 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 12.00 150.00 133.33 135.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 20.00 180.00 185.97 75.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 135.00 180.00 177.67 163.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 63 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01597 Potholing Hour =================================================== BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 10.00 175.00 214.49 276.46 ITSSW00-378 VMS REPLACEMENT IN REGIONS 1, 06/21/07 50.00 200.00 306.00 188.00 CR600-285 VARIOUS LOCATIONS IN REGION 6 06/28/07 10.00 150.00 167.33 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 802.00 181.26 198.37 172.50 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 40.00 250.00 252.91 258.75 BRR500-087 US 160 PAGOSA SPRINGS 07/12/07 12.00 250.00 372.50 345.00 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 50.00 160.00 202.60 205.00 ITS SW00-457 DRCOG REGION 08/09/07 50.00 180.00 158.38 181.75 BR 0253-192 I-25&128TH 08/16/07 20.00 200.00 190.45 200.00 CR100-126 WEST OF KIT CARSON 08/16/07 20.00 176.59 170.00 125.00 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 20.00 250.00 225.00 175.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 40.00 200.00 179.31 176.00 ITSSW00-455 VMS REPLACEMENT IN REGIONS 1, 08/30/07 100.00 200.00 285.00 350.00 IM 0703-331 WB I-70 AT M.P. 259.70 AND M. 09/06/07 10.00 175.00 217.10 275.88 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 30.00 200.00 236.88 290.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 392.00 199.70 223.71 248.28 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 20.00 180.00 187.05 200.00 IM 0703-336 WB I-70 AT M.P. 259.70 AND M. 10/18/07 10.00 170.00 175.00 160.00 STA 340A-013 SH 340 IN FRUITA 10/25/07 10.00 200.00 229.75 280.00 C 0504-055 PUEBLO COUNTY, US-50C AT SALT 11/01/07 55.00 150.00 220.00 160.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 40.00 179.50 222.50 230.00 SHE 082A-010 SH 82 AND BUFFALO VALLEY ROAD 11/29/07 12.00 185.00 203.13 180.00 STSR400-229 SH 14, SH 93, & SH 157 IN BOU 12/06/07 28.00 180.00 189.60 243.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 50.00 180.00 228.51 180.00 CC 0821-084 SH82 ASPEN 12/20/07 50.00 200.00 282.17 300.00 SHE 160A-009 U.S. 160 MP 94.15 - MP 96.63 12/20/07 20.00 200.00 249.72 146.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 295.00 179.63 226.45 211.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,952.00 188.62 206.47 194.88 =============== 203-01620 Sweeping Hour =================================================== IM 0253-196 I-25: 48TH AVE TO US 36 225: 05/31/07 100.00 100.00 151.00 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 100.00 100.00 151.00 120.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 64 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01620 Sweeping Hour =================================================== BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 100.00 110.00 114.83 89.22 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 100.00 110.00 114.83 89.22 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 200.00 105.00 127.98 104.61 =============== 203-01622 Sweeping (With Pickup Broom) Hour =================================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 75.00 125.00 133.13 86.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 75.00 125.00 133.13 86.00 C 0504-055 PUEBLO COUNTY, US-50C AT SALT 11/01/07 20.00 150.00 170.00 160.00 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 24.00 130.00 171.05 110.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 300.00 125.00 148.35 140.00 CC 0821-084 SH82 ASPEN 12/20/07 20.00 75.00 257.71 481.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 364.00 123.96 156.68 157.87 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 439.00 124.13 153.76 145.59 =============== 203-02300 Rock Scaler Hour =================================================== IM0703-323 GEORGETOWN HILL CHUTE 2 AND 3 08/30/07 50.00 125.22 371.75 160.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 50.00 125.22 371.75 160.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 125.22 371.75 160.00 =============== 203-02330 Laborer Hour =================================================== IM 0702-269 I 70 IN EAGLE COUNTY 01/11/07 50.00 50.00 45.50 46.00 IM 0702-270 I 70 THROUGH GLENWOOD CANYON 01/11/07 40.00 50.00 38.00 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 90.00 50.00 41.41 41.11 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 65 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-02330 Laborer Hour =================================================== STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 40.00 42.30 41.20 46.00 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 50.00 45.00 45.67 68.00 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 20.00 36.82 47.49 71.33 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 20.00 40.00 38.67 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 130.00 42.14 44.08 57.44 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 40.00 50.00 40.93 32.91 BRR500-087 US 160 PAGOSA SPRINGS 07/12/07 20.00 55.00 42.50 44.00 NH 5502-055 COALBANK PASS 08/09/07 40.00 75.00 111.50 100.00 BR 0253-192 I-25&128TH 08/16/07 24.00 40.00 60.89 44.00 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 40.00 50.00 43.75 25.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 40.00 50.00 52.38 53.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 204.00 54.22 53.63 50.85 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 176.00 77.50 39.75 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 176.00 77.50 39.75 30.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 600.00 57.80 44.38 44.70 =============== 206-00000 Str Excav Cubic Yard ============================================= STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 53.00 30.00 36.98 38.00 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 61.00 20.00 45.67 35.00 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 10.00 20.00 36.13 16.25 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 33.00 35.00 48.27 15.00 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 40.00 25.00 36.67 36.00 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 125.00 30.00 37.67 38.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 322.00 27.69 41.11 34.15 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 1,088.00 9.80 13.40 10.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 66 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00000 Str Excav Cubic Yard ============================================= NH 0405-025 KIT CARSON BRIDGE 04/26/07 410.00 26.34 32.14 85.00 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 221.00 22.00 27.36 23.50 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 16,264.00 9.00 11.47 14.89 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 4,785.00 8.00 8.41 6.00 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 13.00 15.00 23.67 11.00 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 95.00 30.69 40.09 18.46 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 1,686.00 8.00 15.00 3.50 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 1,900.00 30.00 22.54 22.67 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 26,462.00 10.75 12.61 14.08 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 1,651.30 30.00 28.30 16.64 BRR500-087 US 160 PAGOSA SPRINGS 07/12/07 195.00 75.00 48.50 42.00 C065A-020 SH65 GRAND MESA SLIDE REPAIR 07/26/07 9,850.00 25.00 27.00 25.00 NH 5502-055 COALBANK PASS 08/09/07 13.00 100.00 221.00 200.00 BR 0253-192 I-25&128TH 08/16/07 2,467.00 10.00 9.44 6.85 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 4.00 40.00 200.00 150.00 C0701-190 26.5 ROAD/I-70 BRIDGE REPAIR 08/27/07 70.00 40.00 46.67 40.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 3,187.00 20.00 12.65 14.50 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 4,221.00 25.00 25.71 10.60 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 1,853.00 40.00 39.38 46.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 23,511.30 24.79 24.61 20.46 BR R300-130 I-70 (VARIOUS LOCATIONS) 10/18/07 92.00 25.00 29.17 16.50 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 8,498.00 12.00 14.28 18.11 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 2,796.00 18.25 15.48 5.00 BR 0241-047 US 24, 2 MI S OF GRANITE, CHA 11/15/07 260.00 100.00 38.45 8.97 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 852.00 18.00 16.07 9.43 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 3,497.00 16.00 19.32 20.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 2,906.00 8.00 17.63 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 18,901.00 14.59 16.76 14.59 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 69,196.30 16.65 17.24 16.48 =============== 206-00050 Str Bkfl (Spec) Cubic Yard ============================================= BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 412.00 35.00 13.65 16.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 412.00 35.00 13.65 16.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 412.00 35.00 13.65 16.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 67 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00065 Str Bkfl (Flow-Fill) Cubic Yard ============================================= BR 109A-018 SH 109 LA JUNTA, SH50, MANZI 01/11/07 17.00 120.00 153.50 166.00 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 9.00 150.00 140.70 88.60 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 10.00 150.00 184.67 54.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 36.00 135.83 152.09 115.54 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 115.00 110.00 219.33 150.00 BR 059A-032 ON SH 59 IN SEDGWICK COUNTY 06/07/07 145.00 100.00 144.54 100.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 250.00 110.00 94.00 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 510.00 107.16 139.17 101.47 BRR500-087 US 160 PAGOSA SPRINGS 07/12/07 154.00 400.00 434.00 568.00 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 11.00 180.00 159.66 220.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 165.00 385.33 415.71 544.80 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 530.00 90.00 101.97 115.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 530.00 90.00 101.97 115.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,241.00 137.65 132.23 166.60 =============== 206-00066 Str Bkfl (FF Ash) Cubic Yard ============================================= IM 0253-196 I-25: 48TH AVE TO US 36 225: 05/31/07 35.00 200.00 217.25 200.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 39.00 200.00 94.00 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 74.00 200.00 161.14 136.76 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 74.00 200.00 161.14 136.76 =============== 206-00100 Str Bkfl (CL 1) Cubic Yard ============================================= STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 121.00 50.00 49.05 52.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 68 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00100 Str Bkfl (CL 1) Cubic Yard ============================================= NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 44.00 25.00 49.00 46.00 IM 0703-319 EJMT 24.9 KV SERVICE 01/25/07 555.00 45.00 43.19 29.11 HB 149A-023 SOUTH FORK TO CREEDE - SHOULD 02/08/07 8.00 100.00 375.00 300.00 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 657.00 35.00 28.06 33.50 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 154.00 35.00 41.79 29.60 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 33.00 28.00 105.33 105.00 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 150.00 60.00 67.67 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,722.00 41.37 38.61 38.27 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 903.00 30.04 25.10 25.00 NH 0405-025 KIT CARSON BRIDGE 04/26/07 1,318.00 24.19 44.23 45.00 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 672.00 40.00 47.66 50.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 20,010.00 22.00 26.25 26.99 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 5,712.00 18.00 21.72 21.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 258.00 30.00 29.83 30.50 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 750.00 60.00 41.76 45.74 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 29,623.00 23.01 26.79 27.60 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 1,510.40 40.00 39.32 32.81 BR 0253-192 I-25&128TH 08/16/07 4,184.00 18.00 40.62 35.00 C0701-190 26.5 ROAD/I-70 BRIDGE REPAIR 08/27/07 70.00 46.00 58.67 46.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 2,245.00 30.00 25.90 41.00 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 1,323.00 18.00 51.04 57.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 1,945.00 80.00 43.25 43.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 11,277.40 34.20 40.29 39.93 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 8,738.00 16.00 38.12 43.65 BR 0241-047 US 24, 2 MI S OF GRANITE, CHA 11/15/07 155.00 50.00 62.73 46.49 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 106.00 30.00 53.88 16.08 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 1,771.00 25.00 45.86 38.00 C120A-007 ON SH 120 AT PORTLAND OVER TH 11/29/07 132.00 20.00 93.75 70.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 2,465.00 25.00 55.35 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 13,367.00 19.40 44.62 44.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 55,989.40 24.97 34.01 34.36 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 69 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00200 Str Bkfl (CL 2) Cubic Yard ============================================= NH 0405-025 KIT CARSON BRIDGE 04/26/07 196.00 18.63 21.72 17.00 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 206.00 20.00 27.96 26.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 838.00 28.00 21.21 11.83 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 4,719.00 12.00 9.79 6.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,959.00 14.74 11.61 8.27 BRR500-087 US 160 PAGOSA SPRINGS 07/12/07 30.00 90.00 53.00 36.00 NH 5502-055 COALBANK PASS 08/09/07 13.00 125.00 271.00 300.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 224.00 20.00 14.40 18.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 1,088.00 28.00 32.75 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,355.00 28.98 32.58 34.75 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 98.00 20.00 27.78 63.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 70.00 30.00 57.98 17.00 SHE 160A-009 U.S. 160 MP 94.15 - MP 96.63 12/20/07 1,083.00 15.00 65.00 35.72 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,251.00 16.23 60.35 36.81 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,565.00 17.21 19.07 16.63 =============== 206-00360 Mechanical Reinforcement of Soil Cubic Yard ============================================= STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 642.00 25.00 39.39 22.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 642.00 25.00 39.39 22.30 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 448.00 42.86 46.32 30.00 NH 0405-025 KIT CARSON BRIDGE 04/26/07 1,318.00 23.91 6.62 6.00 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 672.00 24.00 21.01 6.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 19,990.00 14.00 10.45 13.31 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 7,581.00 18.00 12.29 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 30,009.00 16.10 12.05 13.25 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 70 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00360 Mechanical Reinforcement of Soil Cubic Yard ============================================= C065A-020 SH65 GRAND MESA SLIDE REPAIR 07/26/07 6,703.00 65.00 49.33 35.00 BR 0253-192 I-25&128TH 08/16/07 3,989.00 20.00 11.93 16.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 1,683.00 20.00 79.53 15.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 1,104.00 28.00 21.00 29.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 13,479.00 43.03 33.25 26.39 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 5,232.00 31.00 15.29 11.27 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 1,314.00 23.00 26.51 39.00 C120A-007 ON SH 120 AT PORTLAND OVER TH 11/29/07 297.00 22.00 26.38 18.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 1,778.00 20.00 27.75 15.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8,621.00 27.20 21.06 16.62 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 52,751.00 24.91 18.46 17.27 =============== 206-00510 Filter Matl (CL A) Cubic Yard ============================================= NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 16.00 80.00 65.80 65.00 STA 0661-009 ON SH 66 IN WELD COUNTY 02/01/07 268.00 50.00 50.25 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 284.00 51.69 50.70 31.97 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 7.00 50.00 72.33 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7.00 50.00 72.33 50.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 1,298.00 35.00 54.63 42.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,298.00 35.00 54.63 42.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,589.00 38.05 53.31 40.65 =============== 206-00520 Filter Matl (CL B) Cubic Yard ============================================= BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 86.00 50.00 46.68 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 86.00 50.00 46.68 50.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 71 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00520 Filter Matl (CL B) Cubic Yard ============================================= BR 0253-192 I-25&128TH 08/16/07 20.00 75.00 89.29 39.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 177.00 50.00 59.13 42.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 197.00 52.54 62.86 42.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 283.00 51.77 55.95 44.53 =============== 206-01000 Bed Course Matl Cubic Yard ============================================= IM 0703-319 EJMT 24.9 KV SERVICE 01/25/07 185.00 50.00 43.03 24.62 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 185.00 50.00 43.03 24.62 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 185.00 50.00 43.03 24.62 =============== 206-01750 Shoring LUMP SUM =============================================== STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 1.00 35000.00 13105.75 1.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 35000.00 13105.75 1.00 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 1.00 12305.24 8650.81 4500.00 NH 0405-025 KIT CARSON BRIDGE 04/26/07 1.00 34830.57 14298.89 3500.00 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 1.00 30000.00 58168.34 44515.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 25711.94 29162.76 17505.00 BRR500-087 US 160 PAGOSA SPRINGS 07/12/07 1.00 40000.00 36928.00 19856.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 40000.00 36928.00 19856.00 BR R300-130 I-70 (VARIOUS LOCATIONS) 10/18/07 1.00 4000.00 12473.33 15500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 4000.00 12473.33 15500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 26022.64 23904.89 14645.33 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 72 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-01781 Shoring (A 1) LUMP SUM =============================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 1.00 60000.00 27836.07 31930.79 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 60000.00 27836.07 31930.79 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 1.00 50000.00 46652.10 40903.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 1.00 25000.00 24899.88 42000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 37500.00 32150.62 41451.50 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 1.00 30000.00 16776.29 7064.66 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 1.00 20000.00 36773.18 21500.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 1.00 30000.00 24297.56 11000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 26666.67 24136.00 13188.22 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 35833.33 26465.19 25733.08 =============== 206-01782 Shoring (A 2) LUMP SUM =============================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 1.00 60000.00 23063.23 27939.43 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 60000.00 23063.23 27939.43 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 1.00 50000.00 105976.78 92245.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 1.00 25000.00 25237.13 42000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 37500.00 52150.34 67122.50 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 1.00 20000.00 38023.18 21500.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 1.00 15000.00 22830.89 11000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 17500.00 28907.81 16250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 34000.00 34711.65 38936.89 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 73 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-01783 Shoring (A 3) LUMP SUM =============================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 1.00 60000.00 87027.58 86811.83 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 60000.00 87027.58 86811.83 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 1.00 50000.00 124790.70 122521.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 1.00 25000.00 96875.00 40000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 37500.00 106180.23 81260.50 BR0341-069 ON US 34 IN LARIMER COUNTY . 1.00 . 25894.00 . BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 1.00 45000.00 30309.92 17000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 45000.00 29205.94 17000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 45000.00 67713.29 66583.21 =============== 206-01784 Shoring (A 4) LUMP SUM =============================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 1.00 50000.00 19543.00 29931.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 1.00 25000.00 98125.00 40000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 37500.00 71931.00 34965.50 BR0341-069 ON US 34 IN LARIMER COUNTY . 1.00 . 26587.50 . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 . 26587.50 . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 37500.00 60595.13 34965.50 =============== 206-01785 Shoring (A 5) LUMP SUM =============================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 1.00 60000.00 152455.88 94794.51 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 60000.00 152455.88 94794.51 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 74 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-01785 Shoring (A 5) LUMP SUM =============================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 1.00 50000.00 13498.00 17841.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 50000.00 13498.00 17841.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 55000.00 106136.59 56317.76 =============== 206-01786 Shoring (A 6) LUMP SUM =============================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 1.00 60000.00 15645.77 23948.09 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 60000.00 15645.77 23948.09 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 60000.00 15645.77 23948.09 =============== 206-01787 Shoring (A 7) LUMP SUM =============================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 1.00 60000.00 15645.77 23948.09 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 60000.00 15645.77 23948.09 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 60000.00 15645.77 23948.09 =============== 207-00205 Topsoil Cubic Yard ============================================= STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 19,378.00 10.00 11.98 8.75 STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 828.00 25.00 22.62 21.00 STA 012A-042 SH 12, S. OF LA VETA 01/18/07 3,249.00 14.00 25.08 26.50 STA 069A-021 SH 69, W. OF WALSENBURG 01/25/07 3,285.00 14.00 17.65 5.00 IM 0253-194 ON I-25 IN WELD COUNTY 01/25/07 11,058.00 10.00 23.67 13.50 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 642.00 15.00 13.38 12.00 SHE 1151-020 SH 115 VMS, MP 17 AND MP 41 02/15/07 377.00 20.00 44.75 28.76 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 31.00 35.00 61.30 40.00 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 954.00 20.00 23.65 15.40 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 28,982.00 7.00 10.19 9.00 SHE 0504-050 INTERSECTION OF SH 50B AND SH 03/22/07 420.00 20.00 20.46 8.31 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 69,204.00 9.61 13.88 10.66 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 1,631.00 15.00 9.75 2.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 75 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 207-00205 Topsoil Cubic Yard ============================================= SHE0761-193 I-76: SHERIDAN TO I-25 (M.P. 05/17/07 1,887.00 30.00 21.00 14.85 IM0703-317 FROM MP 221.30 TO MP 251.30 J 05/17/07 7,785.00 9.00 7.00 9.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 46,698.00 4.50 3.85 2.09 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 35.00 40.00 128.83 100.00 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 575.00 24.03 14.28 12.26 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 1,000.00 22.00 21.43 25.25 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 265.00 25.00 19.93 19.79 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 59,876.00 6.77 5.57 4.01 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 1,606.00 12.00 10.84 11.25 C065A-020 SH65 GRAND MESA SLIDE REPAIR 07/26/07 200.00 40.00 38.33 15.00 BR 0253-192 I-25&128TH 08/16/07 991.00 25.00 18.35 19.75 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 60.00 70.00 52.78 50.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 2,060.00 15.00 23.22 13.50 IM 0703-331 WB I-70 AT M.P. 259.70 AND M. 09/06/07 690.00 20.00 23.04 38.80 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 1,000.00 7.00 37.94 36.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6,607.00 16.34 20.79 20.32 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 633.00 10.00 11.35 2.00 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 1,371.00 15.00 20.03 17.11 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 760.00 30.00 15.73 5.50 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 481.00 18.00 12.11 7.91 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 165.00 15.00 41.50 37.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 196.00 30.00 42.13 35.00 CC 0821-084 SH82 ASPEN 12/20/07 2,756.00 20.00 33.62 15.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6,362.00 19.15 23.94 13.98 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 142,049.00 9.15 11.85 8.45 =============== 207-00210 Stockpile Topsoil Cubic Yard ============================================= NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 230.00 5.00 12.50 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 230.00 5.00 12.50 5.00 IM0703-317 FROM MP 221.30 TO MP 251.30 J 05/17/07 7,785.00 1.45 5.17 6.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 76 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 207-00210 Stockpile Topsoil Cubic Yard ============================================= IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 46,698.00 2.50 4.23 6.21 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 575.00 6.66 13.29 12.26 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 55,058.00 2.39 4.45 6.24 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 902.00 4.00 4.33 1.50 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 760.00 9.00 9.41 5.00 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 481.00 5.00 7.82 7.91 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 165.00 5.00 21.52 38.00 CC 0821-084 SH82 ASPEN 12/20/07 1,611.00 10.00 24.22 5.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,919.00 7.60 12.72 6.27 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 59,207.00 2.75 5.49 6.24 =============== 207-00305 Wetland Topsoil Cubic Yard ============================================= STA 0661-009 ON SH 66 IN WELD COUNTY 02/01/07 290.00 20.00 13.90 10.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 75.00 35.00 29.15 16.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 365.00 23.08 15.00 11.27 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 90.00 23.00 49.00 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 90.00 23.00 49.00 25.00 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 963.00 30.00 19.59 10.99 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 963.00 30.00 19.59 10.99 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 100.00 18.00 19.14 7.91 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 100.00 18.00 19.14 7.91 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,518.00 27.13 19.02 11.69 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 77 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 207-00310 Stockpile Wetland Topsoil Cubic Yard ============================================= STA 0661-009 ON SH 66 IN WELD COUNTY 02/01/07 290.00 14.00 12.27 5.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 75.00 25.00 21.64 25.92 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 365.00 16.26 12.94 9.30 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 90.00 30.00 45.50 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 90.00 30.00 45.50 40.00 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 100.00 15.00 19.14 7.91 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 100.00 15.00 19.14 7.91 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 555.00 18.26 16.15 14.03 =============== 207-00405 Topsoil (Spec) Cubic Yard ============================================= CC 0821-084 SH82 ASPEN 12/20/07 339.00 20.00 54.98 43.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 339.00 20.00 54.98 43.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 339.00 20.00 54.98 43.35 =============== 208-00002 Erosion Log (12 In) Lin Foot =============================================== STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 200.00 10.00 9.85 10.00 STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 400.00 10.00 7.58 5.25 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 150.00 10.00 11.29 12.00 NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 100.00 7.00 6.80 10.00 IM 0703-319 EJMT 24.9 KV SERVICE 01/25/07 100.00 12.00 12.91 18.33 IM 0253-194 ON I-25 IN WELD COUNTY 01/25/07 500.00 7.00 6.83 4.00 NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 100.00 6.00 11.00 11.00 STA 0661-009 ON SH 66 IN WELD COUNTY 02/01/07 800.00 6.00 5.86 5.00 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 665.00 8.00 5.62 5.00 STA 086A-045 SH 86 - FRANKTOWN TO ELBERT C 02/01/07 280.00 7.50 6.63 4.55 STA 1251-005 SH 125 AND 127 NORTH OF COWDR 02/08/07 250.00 12.00 11.43 12.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 78 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00002 Erosion Log (12 In) Lin Foot =============================================== NH 0062-023 SH 6, CLEAR CREEK CANYON 02/08/07 650.00 6.00 6.52 9.10 IM0252-388 I-25 LARKSPUR INTERCHANGE NOR 03/08/07 100.00 5.75 18.16 15.25 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 400.00 9.00 8.13 10.00 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 140.00 6.00 10.92 4.75 STA0091-030 SH 9 BETWEEN FAIRPLAY AND ALM 03/22/07 1,500.00 6.00 5.43 3.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6,335.00 7.36 6.89 6.40 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 950.00 5.66 7.68 4.50 NH 0405-025 KIT CARSON BRIDGE 04/26/07 3,870.00 5.11 5.39 5.00 STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 730.00 5.21 6.24 5.70 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 2,954.00 6.00 4.98 4.80 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 4,100.00 5.06 6.52 5.50 STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 400.00 7.56 7.63 6.20 IM0703-317 FROM MP 221.30 TO MP 251.30 J 05/17/07 3,820.00 4.73 10.30 5.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 25,157.00 8.00 4.63 4.00 NH 3851-016 US 385 NORTH OF BURLINGTON 05/24/07 560.00 6.51 8.13 6.40 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 150.00 15.00 16.00 15.00 BR 059A-032 ON SH 59 IN SEDGWICK COUNTY 06/07/07 300.00 6.00 9.16 7.00 IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 1,570.00 5.50 6.00 6.00 NH0341-071 US 34: GARFIELD TO MORNING DR 06/14/07 200.00 6.00 14.25 10.00 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 400.00 5.00 7.67 9.00 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 500.00 9.24 6.81 5.11 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 45,661.00 6.88 5.67 4.65 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 2,150.00 6.00 5.37 5.25 C065A-020 SH65 GRAND MESA SLIDE REPAIR 07/26/07 250.00 8.00 7.67 8.00 SHE 0702-267 NEAR VAIL IN EAGLE COUNTY 08/02/07 650.00 5.95 10.22 6.00 ITS SW00-457 DRCOG REGION 08/09/07 50.00 50.00 71.98 18.95 CR100-126 WEST OF KIT CARSON 08/16/07 1,880.00 5.45 5.10 5.50 C0701-190 26.5 ROAD/I-70 BRIDGE REPAIR 08/27/07 100.00 4.40 8.80 4.40 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 780.00 10.00 8.98 14.50 IM0703-323 GEORGETOWN HILL CHUTE 2 AND 3 08/30/07 80.00 8.52 25.63 22.00 IM 0703-331 WB I-70 AT M.P. 259.70 AND M. 09/06/07 100.00 20.00 8.09 3.34 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 300.00 5.00 6.47 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6,340.00 6.93 6.94 6.96 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 2,830.00 4.50 4.02 2.30 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 79 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00002 Erosion Log (12 In) Lin Foot =============================================== SHE0092-019 SH 9 NORTH OF SILVERTHORNE, I 10/18/07 1,000.00 7.75 9.02 7.95 IM 0703-336 WB I-70 AT M.P. 259.70 AND M. 10/18/07 100.00 11.50 7.48 4.90 STA 340A-013 SH 340 IN FRUITA 10/25/07 1,390.00 6.00 9.44 17.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 3,639.00 5.70 6.14 5.50 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 1,700.00 4.50 7.93 5.05 STSR400-229 SH 14, SH 93, & SH 157 IN BOU 12/06/07 260.00 6.00 17.79 13.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 600.00 8.00 8.70 7.50 CC 0821-084 SH82 ASPEN 12/20/07 90.00 15.00 13.17 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 11,609.00 5.69 6.33 6.57 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 69,945.00 6.73 6.07 5.33 =============== 208-00003 Erosion Log (18 In) Lin Foot =============================================== STA 0661-009 ON SH 66 IN WELD COUNTY 02/01/07 350.00 10.00 9.07 7.00 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 250.00 10.00 12.97 6.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 600.00 10.00 9.76 6.96 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 3,250.00 7.00 12.08 8.95 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 1,720.00 8.25 8.39 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4,970.00 7.43 10.18 8.62 BRR500-087 US 160 PAGOSA SPRINGS 07/12/07 110.00 10.00 11.00 12.00 CR100-126 WEST OF KIT CARSON 08/16/07 12,690.00 4.59 6.82 6.80 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 300.00 20.00 15.52 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 13,100.00 4.99 6.94 7.03 BR 0241-047 US 24, 2 MI S OF GRANITE, CHA 11/15/07 905.00 10.00 12.08 32.81 SHE 160A-009 U.S. 160 MP 94.15 - MP 96.63 12/20/07 1,743.00 8.00 13.64 12.28 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,648.00 8.68 12.85 19.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21,318.00 6.16 8.73 8.92 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 80 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00004 Silt Berm Lin Foot =============================================== SHE0761-193 I-76: SHERIDAN TO I-25 (M.P. 05/17/07 200.00 8.00 12.08 9.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 200.00 8.00 12.08 9.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 200.00 8.00 12.08 9.10 =============== 208-00005 Erosion Log Lin Foot =============================================== HB 0063-021 US 6: RIFLE TO NEW CASTLE 01/04/07 150.00 15.00 11.30 10.80 STA 069A-021 SH 69, W. OF WALSENBURG 01/25/07 200.00 5.00 8.98 9.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 310.00 10.00 7.28 10.00 IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 500.00 5.00 5.94 5.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,160.00 7.63 7.45 7.88 STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 400.00 7.00 9.45 11.50 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 2,700.00 5.00 4.66 4.50 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 100.00 10.00 8.50 7.00 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 1,400.00 5.00 8.65 6.78 CR600-285 VARIOUS LOCATIONS IN REGION 6 06/28/07 100.00 7.50 8.33 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4,700.00 5.33 6.90 5.95 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 38,188.00 5.00 4.29 3.41 SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 10.00 20.00 25.90 25.90 NH 5502-055 COALBANK PASS 08/09/07 260.00 15.00 11.85 7.69 BR 0253-192 I-25&128TH 08/16/07 175.00 15.00 11.71 8.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 500.00 4.00 7.40 3.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 39,133.00 5.10 4.34 3.47 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 44,993.00 5.19 4.57 3.84 =============== 208-00007 Erosion Log (8 In) Lin Foot =============================================== STA 012A-042 SH 12, S. OF LA VETA 01/18/07 800.00 7.00 7.32 7.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 81 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00007 Erosion Log (8 In) Lin Foot =============================================== SHE 5502-054 02/22/07 48.00 20.00 12.42 15.25 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 340.00 7.50 5.12 4.25 HB 065A-019 SH 65 THRU CEDAREDGE 03/08/07 250.00 7.00 11.75 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,438.00 7.55 7.38 7.77 NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 100.00 10.00 17.90 8.60 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 60.00 4.15 7.70 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 160.00 7.81 12.68 6.88 BR R300-130 I-70 (VARIOUS LOCATIONS) 10/18/07 90.00 8.00 15.50 5.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 90.00 8.00 15.50 5.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,688.00 7.60 7.97 7.57 =============== 208-00010 Erosion Bales Each =================================================== STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 18.00 18.00 26.33 13.00 SHE 1151-018 SH 115 - GUMAER AVENUE EAST 03/08/07 10.00 21.00 42.83 60.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 28.00 19.07 32.22 29.96 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 50.00 15.00 20.67 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 50.00 15.00 20.67 20.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 40.00 15.00 34.88 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 40.00 15.00 34.88 14.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 118.00 15.97 29.48 20.33 =============== 208-00011 Erosion Bales (Weed Free) Each =================================================== STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 100.00 20.00 15.96 15.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 82 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00011 Erosion Bales (Weed Free) Each =================================================== STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 40.00 20.00 19.67 16.00 SHE 0931-027 SH 93 @ SH 72 01/25/07 5.00 14.00 29.23 48.00 HB 149A-023 SOUTH FORK TO CREEDE - SHOULD 02/08/07 100.00 15.00 43.67 70.00 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 9.00 25.00 39.58 70.00 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 26.00 20.00 15.40 15.00 SHE 0504-050 INTERSECTION OF SH 50B AND SH 03/22/07 18.00 20.00 21.93 15.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 298.00 18.37 24.57 36.02 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 212.00 12.26 29.42 10.00 NH 0405-025 KIT CARSON BRIDGE 04/26/07 15.00 22.25 34.47 20.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 2,664.00 12.00 16.12 11.48 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 48.00 15.00 28.04 60.00 BR 059A-032 ON SH 59 IN SEDGWICK COUNTY 06/07/07 9.00 25.00 24.63 20.00 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 33.00 16.00 27.33 15.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 113.00 13.00 12.84 12.50 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 72.00 23.57 17.36 13.59 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,166.00 12.49 18.01 12.30 BRR500-087 US 160 PAGOSA SPRINGS 07/12/07 70.00 25.00 36.50 34.00 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 50.00 15.00 22.64 17.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 120.00 20.83 29.33 26.92 BR R300-130 I-70 (VARIOUS LOCATIONS) 10/18/07 72.00 20.00 40.33 25.00 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 98.00 20.00 34.63 13.50 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 150.00 22.75 21.14 16.00 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 50.00 16.00 24.69 12.11 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 6.00 40.00 52.98 20.00 CC 0821-084 SH82 ASPEN 12/20/07 64.00 25.00 33.16 15.95 SHE 160A-009 U.S. 160 MP 94.15 - MP 96.63 12/20/07 125.00 20.00 32.41 32.17 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 565.00 21.15 28.31 19.98 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,149.00 14.33 20.43 15.47 =============== 208-00015 Sand Bag Each =================================================== STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 9.00 16.49 67.85 20.70 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 83 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00015 Sand Bag Each =================================================== IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 30.00 17.20 10.11 4.79 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 39.00 17.04 16.30 8.46 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 39.00 17.04 16.30 8.46 =============== 208-00020 Silt Fence Lin Foot =============================================== HB 0063-021 US 6: RIFLE TO NEW CASTLE 01/04/07 1,000.00 3.00 6.08 3.45 STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 200.00 3.50 2.65 1.50 BR 109A-018 SH 109 LA JUNTA, SH50, MANZI 01/11/07 1,500.00 2.00 2.25 2.00 NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 500.00 2.50 1.38 2.00 SHE 0931-027 SH 93 @ SH 72 01/25/07 200.00 4.00 4.02 4.15 STA 0661-009 ON SH 66 IN WELD COUNTY 02/01/07 450.00 2.25 1.78 1.10 HB 149A-023 SOUTH FORK TO CREEDE - SHOULD 02/08/07 200.00 15.00 15.95 20.00 SHE 5502-054 02/22/07 300.00 3.00 4.40 6.30 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 1,200.00 3.00 2.53 1.85 SHE 1151-018 SH 115 - GUMAER AVENUE EAST 03/08/07 370.00 2.50 2.89 2.00 SHE 0504-050 INTERSECTION OF SH 50B AND SH 03/22/07 3,494.00 2.50 1.63 1.18 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9,414.00 2.86 2.73 2.34 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 600.00 2.23 3.43 2.00 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 2,700.00 3.50 4.15 3.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 6,540.00 1.50 1.89 0.97 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 2,419.00 2.00 3.63 3.50 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 650.00 3.00 4.25 2.50 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 800.00 3.00 2.36 2.50 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 2,075.00 1.20 1.82 2.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 2,300.00 1.50 1.30 1.50 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 4,000.00 2.00 1.90 1.55 CR600-285 VARIOUS LOCATIONS IN REGION 6 06/28/07 100.00 7.50 9.10 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 22,184.00 2.00 2.52 1.92 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 2,717.00 3.00 2.28 2.35 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 4,000.00 2.50 1.49 1.40 BR 0253-192 I-25&128TH 08/16/07 4,070.00 2.00 3.38 3.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 2,610.00 2.00 2.23 4.50 IM R400-215 I-25 & I-76 VMS INSTALLATION 09/06/07 780.00 2.50 5.22 5.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 84 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00020 Silt Fence Lin Foot =============================================== IM 0703-331 WB I-70 AT M.P. 259.70 AND M. 09/06/07 500.00 3.00 2.57 1.62 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 1,400.00 2.20 2.88 3.50 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 1,000.00 1.00 4.80 1.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 17,077.00 2.29 2.63 2.74 BR R300-130 I-70 (VARIOUS LOCATIONS) 10/18/07 420.00 5.00 9.17 2.50 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 1,513.00 2.25 4.31 1.75 C 0504-055 PUEBLO COUNTY, US-50C AT SALT 11/01/07 200.00 4.00 2.00 2.00 BR 0241-047 US 24, 2 MI S OF GRANITE, CHA 11/15/07 300.00 6.00 4.98 18.16 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 2,000.00 2.00 2.00 1.26 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 1,800.00 2.00 2.49 1.60 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 400.00 4.00 4.07 7.00 CC 0821-084 SH82 ASPEN 12/20/07 1,100.00 2.50 2.50 2.30 SHE 160A-009 U.S. 160 MP 94.15 - MP 96.63 12/20/07 6,050.00 2.00 2.48 2.46 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 13,783.00 2.33 2.81 2.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 62,458.00 2.28 2.66 2.35 =============== 208-00030 Sediment Basin Each =================================================== BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 1.00 3000.00 2920.75 2069.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 3000.00 2920.75 2069.00 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 1.00 2500.00 7125.42 3500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 2500.00 7125.42 3500.00 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 2.00 2000.00 1887.81 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 2000.00 1887.81 1100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 2375.00 2930.69 1942.25 =============== 208-00033 Sediment Trap Each =================================================== STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 1.00 500.00 1197.67 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 500.00 1197.67 2500.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 85 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00033 Sediment Trap Each =================================================== C R400-217 SIGNALS @ SH66 & CR13 10/04/07 2.00 400.00 653.09 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 400.00 653.09 1100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 433.33 718.44 1566.67 =============== 208-00040 Check Dam Each =================================================== SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 8.00 700.00 628.04 172.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 700.00 628.04 172.50 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 2.00 500.00 745.00 800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 500.00 745.00 800.00 BR 0253-192 I-25&128TH 08/16/07 12.00 400.00 757.92 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.00 400.00 757.92 1000.00 CC 0821-084 SH82 ASPEN 12/20/07 10.00 600.00 400.04 371.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 600.00 400.04 371.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 32.00 543.75 604.24 584.14 =============== 208-00045 Conc Washout Str Each =================================================== HB 0063-021 US 6: RIFLE TO NEW CASTLE 01/04/07 1.00 1200.00 2335.00 810.00 STA 0961-012 SH 96, OVERLAY IN PUEBLO 01/04/07 1.00 1200.00 1645.00 725.00 STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 1.00 1200.00 1509.00 2000.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 86 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00045 Conc Washout Str Each =================================================== IM 0702-269 I 70 IN EAGLE COUNTY 01/11/07 1.00 1000.00 2722.50 3445.00 IM 0702-270 I 70 THROUGH GLENWOOD CANYON 01/11/07 1.00 1300.00 2600.00 2000.00 NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 12.00 400.00 436.92 760.00 BR 109A-018 SH 109 LA JUNTA, SH50, MANZI 01/11/07 6.00 600.00 453.13 356.25 STA 012A-042 SH 12, S. OF LA VETA 01/18/07 1.00 1200.00 2810.17 3710.00 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 1.00 950.00 1715.00 1000.00 NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 1.00 1200.00 954.12 1000.00 SHE 0931-027 SH 93 @ SH 72 01/25/07 2.00 500.00 456.00 105.00 IM 0703-319 EJMT 24.9 KV SERVICE 01/25/07 1.00 1300.00 450.16 650.80 IM 0253-194 ON I-25 IN WELD COUNTY 01/25/07 1.00 1200.00 1851.67 555.00 HB 149A-023 SOUTH FORK TO CREEDE - SHOULD 02/08/07 1.00 2000.00 1600.00 2600.00 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 9.00 400.00 489.69 570.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 3.00 3200.00 2158.25 900.00 SHE 5502-054 02/22/07 1.00 1000.00 947.33 375.00 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 2.00 500.00 975.63 1000.00 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 1.00 1100.00 1519.17 1600.00 HB 065A-019 SH 65 THRU CEDAREDGE 03/08/07 1.00 1200.00 1230.83 500.00 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 1.00 1500.00 2166.67 1000.00 STA0091-030 SH 9 BETWEEN FAIRPLAY AND ALM 03/22/07 1.00 1500.00 556.00 550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 50.00 873.00 880.29 876.37 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 2.00 1076.77 1383.16 1000.00 NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 1.00 1200.00 2700.00 3700.00 NH 030A-025 SH30 (HAVANA)- PARKER TO FLOR 04/19/07 9.00 600.00 327.85 105.00 NH 0405-025 KIT CARSON BRIDGE 04/26/07 2.00 952.48 1608.76 700.00 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 1.00 3000.00 1933.33 1500.00 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 3.00 1200.00 1094.17 2029.50 SHE0761-193 I-76: SHERIDAN TO I-25 (M.P. 05/17/07 2.00 525.00 722.88 519.40 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 10.00 1500.00 1730.48 628.92 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 2.00 800.00 1190.16 1347.00 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 1.00 2000.00 800.00 1500.00 IM 0253-196 I-25: 48TH AVE TO US 36 225: 05/31/07 30.00 100.00 479.75 500.00 BR 059A-032 ON SH 59 IN SEDGWICK COUNTY 06/07/07 1.00 1200.00 1473.13 1500.00 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 2.00 500.00 457.00 225.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 4.00 1500.00 1467.64 250.00 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 1.00 1014.63 1929.48 2610.11 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 7.00 250.00 846.67 1075.00 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 1.00 1500.00 1502.79 877.51 ITSSW00-378 VMS REPLACEMENT IN REGIONS 1, 06/21/07 8.00 500.00 751.87 213.60 CR600-285 VARIOUS LOCATIONS IN REGION 6 06/28/07 10.00 600.00 358.33 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 97.00 643.02 847.73 647.70 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 1.00 1500.00 1343.79 775.28 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 87 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00045 Conc Washout Str Each =================================================== BRR500-087 US 160 PAGOSA SPRINGS 07/12/07 1.00 2000.00 1397.00 1294.00 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 1.00 1200.00 2183.75 426.00 C065A-020 SH65 GRAND MESA SLIDE REPAIR 07/26/07 1.00 900.00 700.00 500.00 NH 5502-055 COALBANK PASS 08/09/07 1.00 1000.00 550.00 1000.00 ITS SW00-457 DRCOG REGION 08/09/07 1.00 300.00 986.48 1892.95 BR 0253-192 I-25&128TH 08/16/07 6.00 1200.00 1659.25 710.00 CR100-126 WEST OF KIT CARSON 08/16/07 5.00 833.61 756.25 425.00 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 1.00 1500.00 2312.50 1500.00 C0701-190 26.5 ROAD/I-70 BRIDGE REPAIR 08/27/07 1.00 250.00 835.33 250.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 3.00 2500.00 5131.75 8222.00 ITSSW00-455 VMS REPLACEMENT IN REGIONS 1, 08/30/07 10.00 200.00 287.50 225.00 C0701-187 I-70 20 ROAD BRIDGE REPAIR 09/06/07 2.00 1500.00 1576.60 500.00 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 2.00 1200.00 1680.97 2500.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 4.00 800.00 1211.00 840.00 C R600 - 300 VARIOUS LOCATIONS IN REGION 6 09/27/07 5.00 500.00 651.80 535.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 45.00 902.62 1388.70 1177.21 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 1.00 1200.00 818.35 1300.00 BR R300-130 I-70 (VARIOUS LOCATIONS) 10/18/07 2.00 2500.00 1316.67 900.00 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 1.00 1500.00 1046.54 1286.14 STA 340A-013 SH 340 IN FRUITA 10/25/07 1.00 3000.00 4691.25 12000.00 C 0504-055 PUEBLO COUNTY, US-50C AT SALT 11/01/07 2.00 1200.00 600.00 500.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 2.00 1309.00 1312.50 800.00 BR 0241-047 US 24, 2 MI S OF GRANITE, CHA 11/15/07 1.00 1500.00 1303.98 845.67 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 2.00 1000.00 1112.11 328.00 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 2.00 1500.00 1442.44 890.00 STSR400-229 SH 14, SH 93, & SH 157 IN BOU 12/06/07 7.00 750.00 429.20 178.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 6.00 1000.00 1499.54 1000.00 CC 0821-084 SH82 ASPEN 12/20/07 4.00 1000.00 1800.00 2600.00 SHE 160A-009 U.S. 160 MP 94.15 - MP 96.63 12/20/07 1.00 1500.00 2307.47 719.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 32.00 1217.75 1273.33 1269.79 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 224.00 828.61 1021.65 893.99 =============== 208-00050 Storm Drain Inlet Protection Each =================================================== IM 0702-270 I 70 THROUGH GLENWOOD CANYON 01/11/07 25.00 250.00 200.00 240.00 NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 30.00 150.00 173.73 217.00 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 10.00 150.00 277.89 360.00 SHE 5502-054 02/22/07 1.00 400.00 351.59 200.00 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 4.00 400.00 334.88 172.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 88 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00050 Storm Drain Inlet Protection Each =================================================== IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 20.00 150.00 237.91 390.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 90.00 191.67 221.74 275.53 NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 50.00 225.00 227.50 270.00 NH 030A-025 SH30 (HAVANA)- PARKER TO FLOR 04/19/07 36.00 200.00 244.20 177.00 SHE 0251-175 ALONG I 25 NORTH OF THE CITY 04/26/07 12.00 200.00 219.63 252.00 SHE0761-193 I-76: SHERIDAN TO I-25 (M.P. 05/17/07 6.00 250.00 294.20 391.00 IM 0253-196 I-25: 48TH AVE TO US 36 225: 05/31/07 20.00 200.00 289.75 175.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 26.00 300.00 159.33 165.00 CR600-285 VARIOUS LOCATIONS IN REGION 6 06/28/07 5.00 200.00 365.00 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 155.00 226.77 237.60 229.24 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 9.00 300.00 245.28 147.25 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 4.00 200.00 262.29 160.00 ITS SW00-457 DRCOG REGION 08/09/07 10.00 300.00 269.15 178.30 BR 0253-192 I-25&128TH 08/16/07 4.00 150.00 393.96 240.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 1.00 400.00 259.41 188.00 IM 0703-331 WB I-70 AT M.P. 259.70 AND M. 09/06/07 4.00 200.00 643.30 334.40 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 25.00 300.00 294.20 430.00 C R600 - 300 VARIOUS LOCATIONS IN REGION 6 09/27/07 12.00 250.00 231.80 182.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 69.00 272.46 291.11 277.79 IM 0703-336 WB I-70 AT M.P. 259.70 AND M. 10/18/07 4.00 276.50 317.50 420.00 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 4.00 175.00 451.04 250.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 10.00 250.00 584.74 1000.00 CC 0821-084 SH82 ASPEN 12/20/07 53.00 300.00 233.91 180.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 71.00 284.59 299.93 313.29 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 385.00 237.42 256.15 264.26 =============== 208-00051 Storm Drain Inlet Protection (Type 1) Lin Foot =============================================== STA 0961-012 SH 96, OVERLAY IN PUEBLO 01/04/07 360.00 15.00 12.78 10.40 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 89 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00051 Storm Drain Inlet Protection (Type 1) Lin Foot =============================================== NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 252.00 15.00 14.40 20.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 330.00 43.00 16.58 10.00 STA0091-030 SH 9 BETWEEN FAIRPLAY AND ALM 03/22/07 14.00 25.00 41.98 48.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 956.00 24.81 14.69 13.35 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 31.00 49.61 21.39 50.00 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 95.00 14.00 13.13 4.50 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 387.00 25.00 21.53 7.10 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 150.00 18.00 16.76 8.50 IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 100.00 10.00 17.50 17.00 NH0341-071 US 34: GARFIELD TO MORNING DR 06/14/07 49.00 12.00 20.67 20.00 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 30.00 25.00 53.25 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 842.00 20.88 20.06 13.52 CR100-126 WEST OF KIT CARSON 08/16/07 60.00 32.53 21.19 22.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 60.00 32.53 21.19 22.50 STA 340A-013 SH 340 IN FRUITA 10/25/07 28.00 15.00 228.75 430.00 C 0504-055 PUEBLO COUNTY, US-50C AT SALT 11/01/07 112.00 25.00 16.67 20.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 124.00 25.00 25.61 86.00 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 48.00 27.00 30.76 40.37 STSR400-229 SH 14, SH 93, & SH 157 IN BOU 12/06/07 650.00 11.00 25.87 11.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 962.00 15.35 30.05 35.71 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,820.00 20.57 22.23 21.22 =============== 208-00052 Storm Drain Inlet Protection (Type 2) Lin Foot =============================================== STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 74.00 130.00 25.86 86.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 74.00 130.00 25.86 86.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 74.00 130.00 25.86 86.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 90 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00055 Rigid Inlet Prot Device Each =================================================== BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 2.00 800.00 718.10 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 800.00 718.10 500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 800.00 718.10 500.00 =============== 208-00070 Stabilized Construction Entrance Each =================================================== STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 2.00 1700.00 1192.20 500.00 STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 2.00 1600.00 1325.00 1000.00 NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 1.00 1076.00 1497.77 1625.00 STA 012A-042 SH 12, S. OF LA VETA 01/18/07 2.00 1700.00 5058.33 900.00 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 2.00 1500.00 1618.00 1500.00 STA 069A-021 SH 69, W. OF WALSENBURG 01/25/07 2.00 1700.00 777.50 500.00 NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 2.00 1200.00 1039.45 1000.00 IM 0253-194 ON I-25 IN WELD COUNTY 01/25/07 2.00 1200.00 1450.00 850.00 NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 1.00 1750.00 2000.00 2000.00 STA 0661-009 ON SH 66 IN WELD COUNTY 02/01/07 1.00 1750.00 1687.16 975.00 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 2.00 1200.00 1231.17 750.00 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 1.00 1200.00 1469.14 1860.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 1.00 2100.00 2306.08 1800.00 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 1.00 1500.00 1455.00 1465.00 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 2.00 1600.00 1899.17 1250.00 IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 1.00 1500.00 1217.13 1050.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 25.00 1507.04 1762.99 1091.00 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 6.00 1410.87 1405.88 1200.00 NH 0405-025 KIT CARSON BRIDGE 04/26/07 2.00 1204.44 2440.98 1500.00 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 4.00 900.00 1361.50 1046.00 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 4.00 1500.00 2218.13 2429.00 STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 1.00 1193.06 1137.50 700.00 IM0703-317 FROM MP 221.30 TO MP 251.30 J 05/17/07 1.00 1193.06 1366.67 1500.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 12.00 2000.00 1776.24 1037.96 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 6.00 1500.00 1059.57 679.50 NH 3851-016 US 385 NORTH OF BURLINGTON 05/24/07 1.00 1193.06 1100.00 1500.00 STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 1.00 1200.00 1358.33 1250.00 BR 059A-032 ON SH 59 IN SEDGWICK COUNTY 06/07/07 1.00 1000.00 1575.19 1500.00 IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 1.00 3500.00 1950.00 2000.00 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 1.00 1500.00 1703.25 2100.00 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 2.00 1000.00 950.00 550.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 91 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00070 Stabilized Construction Entrance Each =================================================== IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 2.00 2800.00 2923.52 3500.00 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 1.00 1193.06 2062.76 1919.95 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 4.00 1500.00 1510.00 1700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 50.00 1580.93 1598.40 1360.05 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 3.00 2000.00 1485.12 1330.94 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 2.00 1700.00 2233.71 3000.00 C065A-020 SH65 GRAND MESA SLIDE REPAIR 07/26/07 1.00 2500.00 1900.00 2200.00 BR 0253-192 I-25&128TH 08/16/07 6.00 1600.00 2378.16 1100.00 CR100-126 WEST OF KIT CARSON 08/16/07 4.00 1403.36 1912.50 2500.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 3.00 2000.00 3366.88 5342.50 IM0703-323 GEORGETOWN HILL CHUTE 2 AND 3 08/30/07 1.00 1476.72 3625.00 2000.00 C0701-187 I-70 20 ROAD BRIDGE REPAIR 09/06/07 2.00 1500.00 2653.20 2000.00 IM 0703-331 WB I-70 AT M.P. 259.70 AND M. 09/06/07 2.00 3000.00 1794.99 1379.94 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 2.00 1600.00 2206.24 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 26.00 1799.62 2232.98 2253.08 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 1.00 2200.00 2140.92 1763.69 C 0504-055 PUEBLO COUNTY, US-50C AT SALT 11/01/07 3.00 1500.00 1766.67 1500.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 1.00 1743.00 2500.00 1500.00 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 2.00 1200.00 1892.71 1552.21 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 1.00 1500.00 4693.59 2000.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 6.00 1600.00 1918.07 1500.00 CC 0821-084 SH82 ASPEN 12/20/07 4.00 1000.00 2266.67 1650.00 SHE 160A-009 U.S. 160 MP 94.15 - MP 96.63 12/20/07 2.00 1600.00 2367.31 1253.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 20.00 1457.15 2215.71 1548.71 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 121.00 1592.19 1876.02 1527.54 =============== 208-00100 Sediment Removal and Disposal LUMP SUM =============================================== STA 0961-012 SH 96, OVERLAY IN PUEBLO 01/04/07 1.00 4000.00 2487.00 1435.00 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 1.00 4250.00 6700.00 4000.00 STA 0661-009 ON SH 66 IN WELD COUNTY 02/01/07 1.00 3000.00 4437.28 2000.00 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 1.00 4500.00 2331.67 1750.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 1.00 11000.00 9172.58 2400.00 SHE 5502-054 02/22/07 1.00 1000.00 2030.90 500.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 92 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00100 Sediment Removal and Disposal LUMP SUM =============================================== IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 1.00 5000.00 2770.65 3650.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7.00 4678.57 3917.68 2247.86 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 1.00 3960.90 6423.76 5000.00 NH 0405-025 KIT CARSON BRIDGE 04/26/07 1.00 3362.29 6907.01 7000.00 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 1.00 3000.00 4426.67 2500.00 STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 1.00 2675.65 2640.00 4600.00 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 1.00 3500.00 1767.00 1568.00 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 1.00 4500.00 7697.15 4044.50 SHE0761-193 I-76: SHERIDAN TO I-25 (M.P. 05/17/07 1.00 5000.00 3482.08 1160.38 IM0703-317 FROM MP 221.30 TO MP 251.30 J 05/17/07 1.00 4245.10 5000.00 1000.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 1.00 10000.00 38945.95 4763.80 NH 3851-016 US 385 NORTH OF BURLINGTON 05/24/07 1.00 3951.69 2333.33 2500.00 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 1.00 3000.00 2250.00 2500.00 IM 0253-196 I-25: 48TH AVE TO US 36 225: 05/31/07 1.00 4000.00 9661.00 4000.00 IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 1.00 1500.00 3250.00 3000.00 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 1.00 2500.00 1070.00 610.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 1.00 4000.00 3646.31 3500.00 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 1.00 11140.00 4955.48 5269.52 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16.00 4395.98 6870.88 3313.51 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 1.00 5000.00 8065.21 3871.68 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 1.00 4500.00 5065.68 2500.00 CR100-126 WEST OF KIT CARSON 08/16/07 1.00 4262.62 5275.00 3000.00 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 1.00 5000.00 4250.00 3500.00 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 1.00 5000.00 9069.60 14000.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 1.00 5500.00 11659.38 7300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 4877.10 7434.48 5695.28 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 1.00 2500.00 1894.74 1100.00 STA 340A-013 SH 340 IN FRUITA 10/25/07 1.00 5000.00 9150.00 4800.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 1.00 3791.50 9687.50 3500.00 BR 0241-047 US 24, 2 MI S OF GRANITE, CHA 11/15/07 1.00 3000.00 5001.17 6765.33 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 1.00 5000.00 8643.66 4285.36 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 1.00 5000.00 7639.95 10400.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 1.00 5000.00 19439.35 8000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 7.00 4184.50 7958.66 5550.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 36.00 4489.99 6583.37 3938.15 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 93 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00101 Sediment Removal and Disposal Hour =================================================== STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 50.00 100.00 263.33 210.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 50.00 100.00 263.33 210.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 75.00 125.00 338.81 544.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 75.00 125.00 338.81 544.00 CC 0821-084 SH82 ASPEN 12/20/07 100.00 30.00 190.00 200.00 SHE 160A-009 U.S. 160 MP 94.15 - MP 96.63 12/20/07 10.00 260.00 364.07 35.72 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 110.00 50.91 200.88 185.07 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 235.00 85.00 247.44 304.92 =============== 208-00110 Sediment Removal and Disposal Cubic Yard ============================================= IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 10.00 100.00 170.67 72.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 100.00 170.67 72.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 100.00 170.67 72.00 =============== 208-00200 Erosion Control Supervisor LUMP SUM =============================================== HB 0063-021 US 6: RIFLE TO NEW CASTLE 01/04/07 1.00 6000.00 7438.33 3030.00 STA 0961-012 SH 96, OVERLAY IN PUEBLO 01/04/07 1.00 8000.00 3660.00 3500.00 STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 1.00 7000.00 4820.00 3000.00 IM 0702-270 I 70 THROUGH GLENWOOD CANYON 01/11/07 1.00 10000.00 8575.00 6900.00 STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 1.00 5000.00 3016.67 2000.00 BR 109A-018 SH 109 LA JUNTA, SH50, MANZI 01/11/07 1.00 4500.00 5000.00 5000.00 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 1.00 5000.00 4610.00 4000.00 IM 0253-194 ON I-25 IN WELD COUNTY 01/25/07 1.00 10000.00 4083.33 3500.00 NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 1.00 5000.00 2775.00 2775.00 STA 0661-009 ON SH 66 IN WELD COUNTY 02/01/07 1.00 2500.00 3293.97 500.00 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 1.00 7500.00 3554.27 943.59 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 94 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00200 Erosion Control Supervisor LUMP SUM =============================================== STA 086A-045 SH 86 - FRANKTOWN TO ELBERT C 02/01/07 1.00 2000.00 2326.00 3002.00 STA 1251-005 SH 125 AND 127 NORTH OF COWDR 02/08/07 1.00 6000.00 5716.67 5500.00 HB 149A-023 SOUTH FORK TO CREEDE - SHOULD 02/08/07 1.00 10000.00 2391.67 2600.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 1.00 11000.00 13533.33 5600.00 SHE 5502-054 02/22/07 1.00 3000.00 1902.23 345.00 IM0252-388 I-25 LARKSPUR INTERCHANGE NOR 03/08/07 1.00 4300.00 6730.96 5500.00 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 1.00 8000.00 6283.33 4000.00 HB 065A-019 SH 65 THRU CEDAREDGE 03/08/07 1.00 6000.00 5683.33 3000.00 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 1.00 8000.00 8466.67 5400.00 STA0091-030 SH 9 BETWEEN FAIRPLAY AND ALM 03/22/07 1.00 7000.00 3835.00 6700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 21.00 6466.67 4864.77 3656.93 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 1.00 3074.60 25044.22 5000.00 NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 1.00 6000.00 4400.00 3200.00 NH 0405-025 KIT CARSON BRIDGE 04/26/07 1.00 5483.83 9521.49 7000.00 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 1.00 11000.00 8033.33 5000.00 STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 1.00 2075.76 3249.00 445.00 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 1.00 3500.00 3250.00 6500.00 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 1.00 8000.00 7565.68 8669.50 STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 1.00 2637.75 3835.00 2070.00 IM0703-317 FROM MP 221.30 TO MP 251.30 J 05/17/07 1.00 2903.75 3666.67 1500.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 1.00 40000.00 28096.10 15057.41 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 1.00 75000.00 9499.49 174.50 NH 3851-016 US 385 NORTH OF BURLINGTON 05/24/07 1.00 3163.49 5300.00 2400.00 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 1.00 3000.00 5000.00 5000.00 STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 1.00 5000.00 5183.33 3000.00 IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 1.00 4000.00 3500.00 5500.00 NH0341-071 US 34: GARFIELD TO MORNING DR 06/14/07 1.00 4000.00 3498.33 5000.00 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 1.00 2500.00 2500.00 3000.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 1.00 20000.00 13070.71 15000.00 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 1.00 7975.00 7619.30 7069.04 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 1.00 10000.00 5796.09 7974.64 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20.00 10965.71 8812.29 5428.00 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 1.00 20000.00 10916.53 10832.27 BRR500-087 US 160 PAGOSA SPRINGS 07/12/07 1.00 10000.00 4655.00 4710.00 SHE 0702-267 NEAR VAIL IN EAGLE COUNTY 08/02/07 1.00 10000.00 9040.00 10000.00 C0701-187 I-70 20 ROAD BRIDGE REPAIR 09/06/07 1.00 3000.00 5210.20 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 10750.00 8394.66 7635.57 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 45.00 8846.98 6846.00 4797.73 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 95 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00205 Erosion Control Supervisor Hour =================================================== NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 104.00 80.00 87.46 65.00 STA 012A-042 SH 12, S. OF LA VETA 01/18/07 100.00 82.00 63.83 53.00 STA 069A-021 SH 69, W. OF WALSENBURG 01/25/07 90.00 85.00 71.00 95.00 SHE 0931-027 SH 93 @ SH 72 01/25/07 20.00 65.00 88.20 75.00 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 41.00 80.00 111.67 88.00 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 20.00 80.00 397.06 75.00 IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 120.00 80.00 95.70 104.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 495.00 80.71 102.33 80.27 NH 030A-025 SH30 (HAVANA)- PARKER TO FLOR 04/19/07 72.00 100.00 108.85 85.00 SHE0761-193 I-76: SHERIDAN TO I-25 (M.P. 05/17/07 100.00 85.00 77.38 46.90 IM 0253-196 I-25: 48TH AVE TO US 36 225: 05/31/07 120.00 80.00 98.25 190.00 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 80.00 80.00 82.75 90.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 180.00 70.00 58.67 62.00 ITSSW00-378 VMS REPLACEMENT IN REGIONS 1, 06/21/07 100.00 120.00 122.47 82.40 CR600-285 VARIOUS LOCATIONS IN REGION 6 06/28/07 96.00 80.00 73.33 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 748.00 85.53 87.03 93.33 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 120.00 54.16 69.59 65.00 ITS SW00-457 DRCOG REGION 08/09/07 20.00 110.00 129.28 133.55 BR 0253-192 I-25&128TH 08/16/07 550.00 80.00 60.49 40.00 CR100-126 WEST OF KIT CARSON 08/16/07 150.00 78.73 112.50 125.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 1,560.00 75.00 72.97 96.50 ITSSW00-455 VMS REPLACEMENT IN REGIONS 1, 08/30/07 100.00 90.00 88.00 110.00 IM 0703-331 WB I-70 AT M.P. 259.70 AND M. 09/06/07 30.00 80.00 168.91 315.62 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 100.00 75.00 72.93 80.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 150.00 100.00 77.63 110.00 C R600 - 300 VARIOUS LOCATIONS IN REGION 6 09/27/07 100.00 80.00 65.80 62.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,880.00 77.57 73.25 87.82 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 45.00 75.00 84.06 48.00 BR R300-130 I-70 (VARIOUS LOCATIONS) 10/18/07 50.00 130.00 123.33 60.00 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 40.00 65.00 119.17 166.67 IM 0703-336 WB I-70 AT M.P. 259.70 AND M. 10/18/07 10.00 63.75 93.75 85.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 96 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00205 Erosion Control Supervisor Hour =================================================== C 0504-055 PUEBLO COUNTY, US-50C AT SALT 11/01/07 66.00 85.00 71.00 78.00 BR 0241-047 US 24, 2 MI S OF GRANITE, CHA 11/15/07 60.00 100.00 88.29 143.76 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 2,160.00 35.00 30.80 25.23 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 432.00 65.00 60.76 30.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 700.00 100.00 58.54 80.00 CC 0821-084 SH82 ASPEN 12/20/07 300.00 40.00 76.33 50.00 SHE 160A-009 U.S. 160 MP 94.15 - MP 96.63 12/20/07 70.00 100.00 135.11 64.33 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,933.00 55.28 46.39 43.07 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,056.00 67.62 60.21 66.02 =============== 208-00206 Erosion Control Supervisor Day ==================================================== C065A-020 SH65 GRAND MESA SLIDE REPAIR 07/26/07 60.00 200.00 450.00 250.00 NH 5502-055 COALBANK PASS 08/09/07 40.00 200.00 148.50 125.00 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 50.00 200.00 81.25 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 150.00 200.00 280.57 166.67 STA 340A-013 SH 340 IN FRUITA 10/25/07 200.00 100.00 77.84 50.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 100.00 164.25 329.00 57.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 300.00 121.42 203.42 52.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 450.00 147.61 217.59 90.44 =============== 208-00300 Temporary Berms Lin Foot =============================================== NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 100.00 15.00 16.83 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 100.00 15.00 16.83 20.00 CR100-126 WEST OF KIT CARSON 08/16/07 2,990.00 1.94 2.88 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,990.00 1.94 2.88 3.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,090.00 2.36 3.22 3.55 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 97 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00400 Water Control LUMP SUM =============================================== STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 1.00 5500.00 16125.00 14000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 5500.00 16125.00 14000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5500.00 16125.00 14000.00 =============== 209-00000 Water M Gallon =============================================== STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 300.00 30.00 21.73 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 300.00 30.00 21.73 60.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 300.00 30.00 21.73 60.00 =============== 209-00600 Dust Palliative (Mg Cl) Gallon ================================================= STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 48,907.00 0.50 1.28 1.50 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 1,500.00 2.00 2.31 5.50 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 1,250.00 2.50 3.57 1.27 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 51,657.00 0.59 1.47 1.61 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 8,000.00 1.20 1.85 2.35 C0701-187 I-70 20 ROAD BRIDGE REPAIR 09/06/07 150.00 2.50 7.80 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8,150.00 1.22 1.92 2.36 STA 340A-013 SH 340 IN FRUITA 10/25/07 8,795.00 1.40 0.94 1.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8,795.00 1.40 0.94 1.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 68,602.00 0.77 1.51 1.63 =============== 210-00001 Res Structure Each =================================================== HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 1.00 1767.04 3620.30 2000.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 98 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00001 Res Structure Each =================================================== SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 1.00 1200.00 3524.00 4700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 1483.52 3585.28 3350.00 BR 0253-192 I-25&128TH 08/16/07 1.00 1100.00 1700.56 1750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1100.00 1700.56 1750.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 2.00 3516.75 3950.00 4500.00 CC 0821-084 SH82 ASPEN 12/20/07 4.00 3500.00 4287.50 3625.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 3505.58 4152.50 3916.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 2788.95 3822.16 3550.00 =============== 210-00007 Res Wheel Stop Each =================================================== SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 1.00 110.00 80.00 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 110.00 80.00 80.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 110.00 80.00 80.00 =============== 210-00010 Res Mailbox Str Each =================================================== HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 6.00 207.52 312.59 250.00 NH 3851-016 US 385 NORTH OF BURLINGTON 05/24/07 15.00 185.29 310.67 260.00 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 3.00 225.00 245.00 135.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 24.00 195.81 305.35 241.88 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 1.00 300.00 232.75 220.00 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 1.00 250.00 402.01 460.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 275.00 292.49 340.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26.00 201.90 303.42 249.42 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 99 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00011 Res Mailbox Str (Ty 1) Each =================================================== HB 0063-021 US 6: RIFLE TO NEW CASTLE 01/04/07 23.00 250.00 266.17 322.00 STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 9.00 200.00 282.00 310.00 STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 26.00 220.00 235.00 220.00 STA 012A-042 SH 12, S. OF LA VETA 01/18/07 14.00 210.00 294.50 292.00 STA 069A-021 SH 69, W. OF WALSENBURG 01/25/07 5.00 210.00 343.25 330.00 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 9.00 150.00 192.29 150.00 STA 086A-045 SH 86 - FRANKTOWN TO ELBERT C 02/01/07 15.00 300.00 245.20 220.00 SHE 1151-018 SH 115 - GUMAER AVENUE EAST 03/08/07 3.00 250.00 295.30 336.00 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 13.00 220.00 270.35 310.00 SHE 0504-050 INTERSECTION OF SH 50B AND SH 03/22/07 2.00 210.00 277.12 297.69 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 119.00 228.07 259.10 268.38 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 14.00 300.00 361.67 275.00 STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 27.00 174.30 324.00 373.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 6.00 310.00 148.23 296.40 STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 2.00 200.00 306.67 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 49.00 227.88 302.45 330.60 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 1.00 200.00 304.80 391.43 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 200.00 304.80 391.43 STA 340A-013 SH 340 IN FRUITA 10/25/07 1.00 225.00 395.16 170.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 225.00 395.16 170.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 170.00 227.83 267.15 286.46 =============== 210-00012 Res Mailbox Str (Ty 2) Each =================================================== HB 0063-021 US 6: RIFLE TO NEW CASTLE 01/04/07 4.00 300.00 329.17 380.00 STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 3.00 210.00 415.20 510.00 STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 2.00 230.00 276.00 240.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 100 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00012 Res Mailbox Str (Ty 2) Each =================================================== STA 012A-042 SH 12, S. OF LA VETA 01/18/07 2.00 250.00 340.50 313.00 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 4.00 250.00 241.63 185.00 STA 086A-045 SH 86 - FRANKTOWN TO ELBERT C 02/01/07 3.00 325.00 307.20 275.00 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 2.00 240.00 340.72 425.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 262.25 315.98 328.55 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 1.00 250.00 418.00 330.00 STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 5.00 224.07 397.50 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 228.39 402.23 388.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26.00 254.44 324.81 342.35 =============== 210-00013 Res Mailbox Str (Ty 3) Each =================================================== HB 0063-021 US 6: RIFLE TO NEW CASTLE 01/04/07 4.00 400.00 438.92 468.50 STA 012A-042 SH 12, S. OF LA VETA 01/18/07 8.00 350.00 427.33 329.00 STA 069A-021 SH 69, W. OF WALSENBURG 01/25/07 4.00 350.00 398.25 375.00 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 3.00 310.00 301.17 250.00 STA 086A-045 SH 86 - FRANKTOWN TO ELBERT C 02/01/07 6.00 350.00 367.40 330.00 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 4.00 350.00 444.18 575.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 29.00 352.76 403.26 380.55 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 1.00 450.00 476.67 360.00 STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 2.00 336.18 452.50 455.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 374.12 462.86 423.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 32.00 354.76 405.76 384.56 =============== 210-00015 Res End Section Each =================================================== HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 1.00 750.00 904.13 833.01 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 750.00 904.13 833.01 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 750.00 904.13 833.01 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 101 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00035 Res Water Meter Each =================================================== NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 5.00 800.00 1222.26 304.79 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 800.00 1222.26 304.79 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 1.00 1000.00 2692.61 7000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1000.00 2692.61 7000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 833.33 1642.36 1420.66 =============== 210-00050 Res Fire Hydrant Each =================================================== NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 7.00 3000.00 2376.63 1828.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7.00 3000.00 2376.63 1828.65 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 1.00 2000.00 3923.75 6882.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 2000.00 3923.75 6882.50 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 1.00 3630.50 3891.74 4200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 3630.50 3891.74 4200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 2958.94 2931.46 2653.67 =============== 210-00060 Res Marker Each =================================================== BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 2.00 200.00 879.22 380.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 200.00 879.22 380.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 200.00 879.22 380.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 102 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00065 Res Monument (Ty 3A) Each =================================================== NH0341-071 US 34: GARFIELD TO MORNING DR 06/14/07 6.00 600.00 533.33 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 600.00 533.33 300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 600.00 533.33 300.00 =============== 210-00090 Res Delineator Each =================================================== SHE0761-193 I-76: SHERIDAN TO I-25 (M.P. 05/17/07 175.00 20.00 15.45 13.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 175.00 20.00 15.45 13.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 175.00 20.00 15.45 13.75 =============== 210-00425 Res Bridge Railing Lin Foot =============================================== STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 414.00 24.23 60.58 58.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 414.00 24.23 60.58 58.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 414.00 24.23 60.58 58.20 =============== 210-00440 Repair Curb Lin Foot =============================================== IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 69.00 100.00 146.67 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 69.00 100.00 146.67 90.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 69.00 100.00 146.67 90.00 =============== 210-00473 Res TV Cameras Each =================================================== ITSSW00-455 VMS REPLACEMENT IN REGIONS 1, 08/30/07 2.00 2000.00 1850.00 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 2000.00 1850.00 3000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 2000.00 1850.00 3000.00 =============== 210-00478 Modify Power Control Board LUMP SUM =============================================== IM 0703-326 EISENHOWER JOHNSON MEMORIAL T 12/06/07 1.00 56000.00 33986.62 53400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 56000.00 33986.62 53400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 56000.00 33986.62 53400.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 103 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00500 Reb Port Present Str Each =================================================== STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 2.00 3433.33 8037.50 7775.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 3433.33 8037.50 7775.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 3433.33 8037.50 7775.00 =============== 210-00510 Reb Port Present Str LUMP SUM =============================================== BR 109A-018 SH 109 LA JUNTA, SH50, MANZI 01/11/07 1.00 25000.00 13136.25 6772.50 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 1.00 12000.00 9216.67 7800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 18500.00 10196.56 7286.25 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 1.00 1000.00 9526.67 11000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 1000.00 9526.67 11000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 12666.67 10013.86 8524.17 =============== 210-00520 Reb Port Present Str Sq Yard ================================================ BR 109A-018 SH 109 LA JUNTA, SH50, MANZI 01/11/07 20.40 1900.00 1000.00 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.40 1900.00 1000.00 500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.40 1900.00 1000.00 500.00 =============== 210-00750 Res Light Standard Each =================================================== NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 1.00 1500.00 1880.00 1950.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1500.00 1880.00 1950.00 NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 32.00 1500.00 132.00 110.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 104 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00750 Res Light Standard Each =================================================== NH 0405-025 KIT CARSON BRIDGE 04/26/07 8.00 961.29 875.78 900.00 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 2.00 3000.00 617.50 1110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 42.00 1468.82 296.79 308.10 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 2.00 4000.00 5858.34 5000.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 4.00 1000.00 2941.50 3400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 2000.00 3524.87 3933.33 STA 340A-013 SH 340 IN FRUITA 10/25/07 4.00 1350.00 933.75 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 1350.00 933.75 1000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 53.00 1520.57 680.86 801.70 =============== 210-00760 Res Luminaire Each =================================================== STSR400-229 SH 14, SH 93, & SH 157 IN BOU 12/06/07 11.00 400.00 216.10 366.50 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 2.00 500.00 267.96 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 13.00 415.38 225.39 348.58 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13.00 415.38 225.39 348.58 =============== 210-00805 Res Overhead Sign Str Each =================================================== ITSSW00-378 VMS REPLACEMENT IN REGIONS 1, 06/21/07 1.00 8000.00 10376.07 12316.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 8000.00 10376.07 12316.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 8000.00 10376.07 12316.20 =============== 210-00810 Res Ground Sign Each =================================================== STA 0961-012 SH 96, OVERLAY IN PUEBLO 01/04/07 1.00 250.00 406.00 400.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 105 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00810 Res Ground Sign Each =================================================== STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 2.00 200.00 242.33 38.00 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 3.00 225.00 186.00 165.00 NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 2.00 300.00 383.67 500.00 SHE 0931-027 SH 93 @ SH 72 01/25/07 1.00 200.00 262.11 290.00 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 6.00 275.00 218.88 175.00 SHE 1151-020 SH 115 VMS, MP 17 AND MP 41 02/15/07 2.00 230.00 200.28 193.40 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 20.00 170.00 118.13 167.40 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 12.00 250.00 278.32 310.00 SHE 1151-018 SH 115 - GUMAER AVENUE EAST 03/08/07 1.00 250.00 293.26 201.50 HB 065A-019 SH 65 THRU CEDAREDGE 03/08/07 1.00 250.00 288.33 400.00 IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 1.00 170.00 176.54 105.00 SHE 0504-050 INTERSECTION OF SH 50B AND SH 03/22/07 10.00 220.00 263.04 94.88 STA402A-007 SH 402 & I-25 OFFRAMS AND E. 03/22/07 2.00 200.00 235.50 112.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 64.00 217.27 236.20 197.58 NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 46.00 200.00 178.75 180.00 NH 0405-025 KIT CARSON BRIDGE 04/26/07 30.00 161.38 139.19 150.00 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 1.00 245.00 333.33 400.00 SHE 0251-175 ALONG I 25 NORTH OF THE CITY 04/26/07 5.00 250.00 171.54 190.00 STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 2.00 720.76 277.60 352.00 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 16.00 300.00 149.38 187.50 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 7.00 275.00 176.04 147.00 IM0703-317 FROM MP 221.30 TO MP 251.30 J 05/17/07 10.00 171.77 235.00 230.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 8.00 310.00 220.24 493.97 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 1.00 800.00 1000.00 500.00 IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 10.00 210.00 210.00 170.00 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 10.00 200.00 200.00 100.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 34.00 300.00 268.95 250.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 8.00 200.00 251.67 215.00 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 4.00 180.00 220.88 194.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 192.00 236.04 199.61 204.76 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 40.00 250.00 288.70 199.62 SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 1.00 240.00 65.00 65.00 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 9.00 225.00 511.03 460.00 BR 0253-192 I-25&128TH 08/16/07 5.00 300.00 60.62 38.00 CR100-126 WEST OF KIT CARSON 08/16/07 4.00 176.55 137.55 75.00 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 3.00 300.00 231.95 325.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 6.00 250.00 153.81 151.50 IM R400-215 I-25 & I-76 VMS INSTALLATION 09/06/07 1.00 250.00 1366.20 1350.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 106 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00810 Res Ground Sign Each =================================================== IM 0703-331 WB I-70 AT M.P. 259.70 AND M. 09/06/07 3.00 250.00 340.22 275.88 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 11.00 200.00 377.63 390.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 83.00 241.82 304.77 253.39 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 7.00 170.00 194.44 170.00 SHE0092-019 SH 9 NORTH OF SILVERTHORNE, I 10/18/07 20.00 148.50 191.35 146.75 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 1.00 125.00 414.58 227.08 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 5.00 210.00 301.40 410.00 STSR400-229 SH 14, SH 93, & SH 157 IN BOU 12/06/07 1.00 250.00 357.10 766.50 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 4.00 160.00 354.67 265.00 CC 0821-084 SH82 ASPEN 12/20/07 23.00 120.00 355.00 440.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 61.00 147.30 276.48 300.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 400.00 220.70 247.30 228.35 =============== 210-00815 Res Sign Panel Each =================================================== IM 0702-269 I 70 IN EAGLE COUNTY 01/11/07 2.00 150.00 99.00 88.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 150.00 99.00 88.00 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 1.00 100.00 248.75 125.00 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 7.00 60.00 323.50 500.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 4.00 55.00 114.67 106.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12.00 61.67 259.75 337.42 BR 0253-192 I-25&128TH 08/16/07 1.00 60.00 2636.17 3300.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 4.00 30.00 53.75 46.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 36.00 668.61 696.80 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 2.00 125.00 198.73 280.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 107 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00815 Res Sign Panel Each =================================================== SHE 082A-010 SH 82 AND BUFFALO VALLEY ROAD 11/29/07 1.00 75.00 64.38 110.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 4.00 100.00 68.67 32.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 7.00 103.57 125.55 114.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26.00 74.81 270.11 327.19 =============== 210-00820 Res Var Mesg Sign Each =================================================== ITSSW00-378 VMS REPLACEMENT IN REGIONS 1, 06/21/07 1.00 18000.00 18636.72 16180.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 18000.00 18636.72 16180.15 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 2.00 2419.75 4953.13 8000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 2419.75 4953.13 8000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 7613.17 7113.69 10726.72 =============== 210-00825 Res Flashing Beacon Each =================================================== STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 1.00 1000.00 2431.56 2250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1000.00 2431.56 2250.00 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 2.00 1000.00 540.08 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 1000.00 540.08 200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 1000.00 890.36 883.33 =============== 210-00827 Res Pull Box Each =================================================== SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 2.00 200.00 180.22 160.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 200.00 180.22 160.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 200.00 180.22 160.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 108 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00831 Res Traf Sig Head Each =================================================== SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 7.00 600.00 395.50 222.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7.00 600.00 395.50 222.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 10.00 400.00 364.40 340.00 CC 0821-084 SH82 ASPEN 12/20/07 2.00 800.00 741.67 660.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 12.00 466.67 427.28 393.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19.00 515.79 418.38 330.21 =============== 210-00840 Res Traf Sig Pole Each =================================================== BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 2.00 4500.00 705.29 660.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 4500.00 705.29 660.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 4500.00 705.29 660.00 =============== 210-00842 Res Traf Sig Mast Arm Each =================================================== BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 2.00 400.00 576.93 540.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 400.00 576.93 540.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 400.00 576.93 540.00 =============== 210-00848 Res Traf Sig Control+Cab Each =================================================== STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 1.00 2997.25 3151.88 3600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 2997.25 3151.88 3600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2997.25 3151.88 3600.00 =============== 210-00855 Res Traf Sig Control Cab Each =================================================== SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 1.00 2000.00 2955.20 3183.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 2000.00 2955.20 3183.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2000.00 2955.20 3183.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 109 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00861 Reset Wiring LUMP SUM =============================================== IM 0703-326 EISENHOWER JOHNSON MEMORIAL T 12/06/07 1.00 125000.00 158719.18 168200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 125000.00 158719.18 168200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 125000.00 158719.18 168200.00 =============== 210-00865 Res Ped Sig Head Each =================================================== BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 4.00 500.00 106.69 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 500.00 106.69 100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 500.00 106.69 100.00 =============== 210-00866 Res Fire Preempt Unit+Timer Each =================================================== SHE 0931-027 SH 93 @ SH 72 01/25/07 2.00 300.00 855.80 340.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 300.00 855.80 340.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 2.00 750.00 719.98 781.90 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 1.00 600.00 1040.00 1915.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 700.00 807.25 1159.60 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 1.00 743.75 2590.63 3400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 743.75 2590.63 3400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 573.96 1315.96 1259.80 =============== 210-00870 Res Coordination Unit Each =================================================== SHE 0931-027 SH 93 @ SH 72 01/25/07 1.00 500.00 877.60 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 500.00 877.60 400.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 110 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00870 Res Coordination Unit Each =================================================== SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 1.00 500.00 726.25 470.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 500.00 726.25 470.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 500.00 810.33 435.00 =============== 210-00882 Res Detector Each =================================================== IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 1.00 4000.00 13250.00 23000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 4000.00 13250.00 23000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 4000.00 13250.00 23000.00 =============== 210-00890 Res Int Detect Sys (Camera) Each =================================================== SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 7.00 700.00 916.45 915.80 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 4.00 1000.00 1205.31 1132.74 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 11.00 809.09 1021.49 994.69 STSR400-229 SH 14, SH 93, & SH 157 IN BOU 12/06/07 4.00 950.00 858.40 808.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 950.00 858.40 808.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15.00 846.67 970.52 944.90 =============== 210-01000 Res Fence Lin Foot =============================================== STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 200.00 5.00 4.01 3.60 STA 0661-009 ON SH 66 IN WELD COUNTY 02/01/07 26.00 9.00 32.65 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 226.00 5.46 9.92 4.45 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 406.00 22.72 13.35 12.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 111 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-01000 Res Fence Lin Foot =============================================== STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 316.50 4.00 6.80 6.25 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 100.00 3.00 24.62 26.33 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 822.50 13.12 13.72 11.53 BR R300-130 I-70 (VARIOUS LOCATIONS) 10/18/07 100.00 15.00 33.67 11.00 BR 0241-047 US 24, 2 MI S OF GRANITE, CHA 11/15/07 80.00 12.00 14.80 11.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 180.00 13.67 20.82 11.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,228.50 11.79 14.00 10.20 =============== 210-01011 Res Gate Each =================================================== STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 1.00 422.00 651.25 800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 422.00 651.25 800.00 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 1.00 390.30 597.67 310.00 STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 1.00 350.00 254.17 190.00 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 1.00 200.00 587.54 519.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 313.43 491.08 339.93 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 1.00 350.00 1016.98 560.86 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 350.00 1016.98 560.86 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 1.00 450.00 646.26 700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 450.00 646.26 700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 360.38 643.56 513.44 =============== 210-01130 Res Gdrail Ty 3 Lin Foot =============================================== STA 012A-042 SH 12, S. OF LA VETA 01/18/07 384.00 11.00 14.67 8.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 112 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-01130 Res Gdrail Ty 3 Lin Foot =============================================== STA 069A-021 SH 69, W. OF WALSENBURG 01/25/07 250.00 11.00 8.69 8.50 HB 149A-023 SOUTH FORK TO CREEDE - SHOULD 02/08/07 141.00 15.00 35.17 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 775.00 11.73 15.39 15.80 STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 615.00 7.46 8.12 6.65 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 17,225.00 5.69 11.64 11.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 17,840.00 5.75 11.51 11.57 CC 0821-084 SH82 ASPEN 12/20/07 586.00 10.00 14.03 14.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 586.00 10.00 14.03 14.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19,201.00 6.12 11.76 11.84 =============== 210-01136 Res Gdrail Ty 3 (Dbl) Lin Foot =============================================== IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 950.00 23.20 11.21 12.23 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 950.00 23.20 11.21 12.23 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 950.00 23.20 11.21 12.23 =============== 210-01140 Res Gdrail Ty 4 Lin Foot =============================================== SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 100.00 4.00 40.00 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 100.00 4.00 40.00 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 100.00 4.00 40.00 50.00 =============== 210-01170 Res Gdrail Ty 7 Lin Foot =============================================== IM 0702-270 I 70 THROUGH GLENWOOD CANYON 01/11/07 400.00 15.00 11.65 3.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 400.00 15.00 11.65 3.55 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 113 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-01170 Res Gdrail Ty 7 Lin Foot =============================================== IM0703-323 GEORGETOWN HILL CHUTE 2 AND 3 08/30/07 2,000.00 13.08 17.00 24.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,000.00 13.08 17.00 24.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,400.00 13.40 16.30 20.59 =============== 210-01180 Reset Guardrail (Special) Lin Foot =============================================== IM0703-317 FROM MP 221.30 TO MP 251.30 J 05/17/07 600.00 8.50 9.03 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 600.00 8.50 9.03 10.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 600.00 8.50 9.03 10.00 =============== 210-01200 Res End Anchorage Each =================================================== STA 012A-042 SH 12, S. OF LA VETA 01/18/07 4.00 400.00 739.17 530.00 STA 069A-021 SH 69, W. OF WALSENBURG 01/25/07 4.00 400.00 541.75 552.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 400.00 660.20 541.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 400.00 660.20 541.00 =============== 210-01300 Res Impact Attenuator Each =================================================== IM 0702-270 I 70 THROUGH GLENWOOD CANYON 01/11/07 1.00 2000.00 1660.00 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 2000.00 1660.00 1100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2000.00 1660.00 1100.00 =============== 210-02024 Relay Pipe (24 In) Lin Foot =============================================== C R400-217 SIGNALS @ SH66 & CR13 10/04/07 70.00 40.00 32.99 36.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 70.00 40.00 32.99 36.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 70.00 40.00 32.99 36.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 114 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-02900 Relay Riprap Cubic Yard ============================================= C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 230.00 65.00 37.76 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 230.00 65.00 37.76 25.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 230.00 65.00 37.76 25.00 =============== 210-03100 Replace Conc Pvmt Sq Yard ================================================ IM 0253-196 I-25: 48TH AVE TO US 36 225: 05/31/07 1,655.00 260.00 272.00 305.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,655.00 260.00 272.00 305.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,655.00 260.00 272.00 305.00 =============== 210-04000 Adj Structure Each =================================================== SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 4.00 1500.00 1013.28 353.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 1500.00 1013.28 353.10 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 1.00 750.00 1652.13 1700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 750.00 1652.13 1700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 1350.00 1141.05 622.48 =============== 210-04010 Adj Manhole Each =================================================== HB 0063-021 US 6: RIFLE TO NEW CASTLE 01/04/07 2.00 400.00 1547.50 1475.00 STA 0961-012 SH 96, OVERLAY IN PUEBLO 01/04/07 31.00 500.00 740.10 715.00 STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 8.00 600.00 760.20 650.00 NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 46.00 350.00 523.50 476.00 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 6.00 400.00 525.00 330.00 NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 30.00 550.00 406.20 250.00 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 2.00 350.00 519.60 330.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 26.00 650.00 893.78 1219.10 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 14.00 400.00 465.75 464.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 115 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-04010 Adj Manhole Each =================================================== SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 1.00 525.00 734.58 613.00 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 10.00 500.00 652.50 610.00 HB 065A-019 SH 65 THRU CEDAREDGE 03/08/07 2.00 1000.00 877.50 1000.00 IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 1.00 400.00 647.95 660.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 179.00 487.29 615.14 614.06 NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 33.00 1000.00 935.00 650.00 NH 030A-025 SH30 (HAVANA)- PARKER TO FLOR 04/19/07 96.00 350.00 374.04 215.00 NH0341-071 US 34: GARFIELD TO MORNING DR 06/14/07 48.00 250.00 458.33 300.00 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 1.00 500.00 625.00 500.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 13.00 400.00 508.33 545.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 191.00 441.36 477.14 335.47 BR 0253-192 I-25&128TH 08/16/07 2.00 500.00 683.66 470.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 2.00 1500.00 977.13 1600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 1000.00 814.09 1035.00 STA 340A-013 SH 340 IN FRUITA 10/25/07 4.00 620.00 1043.75 600.00 C 0504-055 PUEBLO COUNTY, US-50C AT SALT 11/01/07 2.00 650.00 623.33 420.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 12.00 720.25 429.88 135.00 CC 0821-084 SH82 ASPEN 12/20/07 2.00 500.00 1150.00 450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 20.00 671.15 580.83 288.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 394.00 479.56 551.00 466.73 =============== 210-04015 Modify Manhole Each =================================================== NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 3.00 1500.00 4101.04 2525.37 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 1500.00 4101.04 2525.37 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 1.00 1500.00 2437.50 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 1500.00 2437.50 3000.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 116 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-04015 Modify Manhole Each =================================================== BR 0253-192 I-25&128TH 08/16/07 1.00 1600.00 3114.59 2700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1600.00 3114.59 2700.00 STA 340A-013 SH 340 IN FRUITA 10/25/07 1.00 2700.00 2467.50 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 2700.00 2467.50 2500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 1716.67 3277.38 2629.35 =============== 210-04016 Modify Manhole (Spec) Each =================================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 2.00 1500.00 1610.25 1616.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 1500.00 1610.25 1616.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1500.00 1610.25 1616.00 =============== 210-04020 Modify Inlet Each =================================================== NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 7.00 1750.00 1565.00 925.00 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 1.00 2000.00 2294.00 1750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 1781.25 1700.63 1028.13 SHE 0251-175 ALONG I 25 NORTH OF THE CITY 04/26/07 1.00 1500.00 4717.20 3255.00 IM0703-317 FROM MP 221.30 TO MP 251.30 J 05/17/07 10.00 2342.40 2800.00 4000.00 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 12.00 2852.67 1353.73 2588.36 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 23.00 2572.00 1987.47 3231.10 CC 0821-084 SH82 ASPEN 12/20/07 2.00 1000.00 1836.25 1567.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 1000.00 1836.25 1567.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 33.00 2285.03 1893.15 2596.22 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 117 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-04025 Modify Structure Each =================================================== IM 0702-269 I 70 IN EAGLE COUNTY 01/11/07 18.00 1500.00 489.00 428.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 18.00 1500.00 489.00 428.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18.00 1500.00 489.00 428.00 =============== 210-04030 Modify Guardrail Lin Foot =============================================== IM 0702-269 I 70 IN EAGLE COUNTY 01/11/07 1,013.00 21.00 11.00 14.00 STA 1251-005 SH 125 AND 127 NORTH OF COWDR 02/08/07 650.00 18.00 21.67 12.00 NH 0402-070 US 40 ROUTT COUNTY 02/08/07 5,213.00 20.00 13.50 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6,876.00 19.96 15.14 12.29 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,876.00 19.96 15.14 12.29 =============== 210-04050 Adj Valve Box Each =================================================== HB 0063-021 US 6: RIFLE TO NEW CASTLE 01/04/07 23.00 250.00 639.58 426.50 STA 0961-012 SH 96, OVERLAY IN PUEBLO 01/04/07 73.00 300.00 402.81 575.00 STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 19.00 280.00 440.40 375.00 NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 104.00 180.00 287.33 304.00 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 12.00 300.00 367.00 300.00 NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 32.00 300.00 215.52 150.00 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 8.00 250.00 210.57 170.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 34.00 550.00 509.34 304.78 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 2.00 250.00 258.75 175.00 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 1.00 275.00 391.58 275.00 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 1.00 250.00 370.83 355.00 HB 065A-019 SH 65 THRU CEDAREDGE 03/08/07 18.00 400.00 440.83 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 327.00 286.90 370.39 368.89 NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 34.00 400.00 445.00 480.00 NH 030A-025 SH30 (HAVANA)- PARKER TO FLOR 04/19/07 94.00 250.00 187.38 84.00 NH0341-071 US 34: GARFIELD TO MORNING DR 06/14/07 98.00 150.00 358.33 150.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 16.00 250.00 198.33 235.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 242.00 230.58 269.74 176.35 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 118 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-04050 Adj Valve Box Each =================================================== NH 1601-056 US 160 @ ROOSA AVE 08/23/07 2.00 350.00 1737.50 350.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 8.00 250.00 605.88 1071.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 3.00 1000.00 584.75 620.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 13.00 438.46 694.90 856.00 STA 340A-013 SH 340 IN FRUITA 10/25/07 5.00 350.00 550.06 440.00 C 0504-055 PUEBLO COUNTY, US-50C AT SALT 11/01/07 8.00 300.00 183.33 200.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 4.00 484.25 253.75 92.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 4.00 250.00 371.97 225.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 21.00 337.48 324.48 241.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 603.00 269.32 337.63 297.68 =============== 210-04051 Adj Valve Box (Spec) Each =================================================== NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 17.00 450.00 315.00 430.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 17.00 450.00 315.00 430.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17.00 450.00 315.00 430.00 =============== 210-04200 Adj Gdrail Lin Foot =============================================== IM 0702-269 I 70 IN EAGLE COUNTY 01/11/07 37,152.00 3.00 2.40 1.80 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 340.00 5.00 2.13 2.00 IM0252-388 I-25 LARKSPUR INTERCHANGE NOR 03/08/07 2,650.00 10.00 2.59 2.45 IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 1,400.00 6.00 2.79 2.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 41,542.00 3.56 2.45 1.87 SHE 0251-175 ALONG I 25 NORTH OF THE CITY 04/26/07 400.00 4.00 3.67 1.60 STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 1,600.00 4.67 2.90 2.80 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 119 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-04200 Adj Gdrail Lin Foot =============================================== IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 975.00 4.25 5.84 4.13 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,975.00 4.44 4.47 3.07 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 44,517.00 3.62 2.64 1.95 =============== 211-03001 Dewatering Special M Gallon =============================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 45.00 1200.00 858.75 630.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 45.00 1200.00 858.75 630.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 45.00 1200.00 858.75 630.00 =============== 211-05001 Crack Preparation (Type 1) Lin Foot =============================================== C0702-273 I-70 GLENWOOD CANYON 08/09/07 300.00 200.00 150.00 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 300.00 200.00 150.00 150.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 300.00 200.00 150.00 150.00 =============== 211-05002 Crack Preparation (Type 2) Lin Foot =============================================== C0702-273 I-70 GLENWOOD CANYON 08/09/07 1,200.00 80.00 50.00 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,200.00 80.00 50.00 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,200.00 80.00 50.00 50.00 =============== 211-05003 Crack Preparation (Type 3) Lin Foot =============================================== C0702-273 I-70 GLENWOOD CANYON 08/09/07 300.00 100.00 75.00 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 300.00 100.00 75.00 75.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 300.00 100.00 75.00 75.00 =============== 212-00005 Seeding (Native) Pound ================================================== STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 20.00 70.75 72.29 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 20.00 70.75 72.29 30.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 70.75 72.29 30.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 120 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00006 Seeding (Native) Acre =================================================== STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 57.00 350.00 324.70 300.00 STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 8.00 600.00 392.17 390.00 STA 012A-042 SH 12, S. OF LA VETA 01/18/07 24.15 600.00 435.33 342.00 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 1.30 750.00 655.00 550.00 STA 069A-021 SH 69, W. OF WALSENBURG 01/25/07 25.00 600.00 407.25 600.00 NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 0.50 1250.00 1373.33 1000.00 IM 0703-319 EJMT 24.9 KV SERVICE 01/25/07 0.25 3000.00 1563.07 1752.00 IM 0253-194 ON I-25 IN WELD COUNTY 01/25/07 40.00 500.00 355.00 350.00 STA 0661-009 ON SH 66 IN WELD COUNTY 02/01/07 1.50 1500.00 737.58 550.00 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 2.00 850.00 854.13 1425.00 STA 086A-045 SH 86 - FRANKTOWN TO ELBERT C 02/01/07 0.10 8000.00 4672.40 2445.00 STA 1251-005 SH 125 AND 127 NORTH OF COWDR 02/08/07 0.30 3000.00 2228.83 2300.00 SHE 1151-020 SH 115 VMS, MP 17 AND MP 41 02/15/07 0.15 3500.00 6609.13 1601.78 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 1.20 1100.00 2536.67 5400.00 SHE 5502-054 02/22/07 0.40 2000.00 1732.54 2695.00 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 1.18 1400.00 1458.73 950.00 SHE 1151-018 SH 115 - GUMAER AVENUE EAST 03/08/07 0.40 1500.00 2444.67 2688.00 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 86.00 450.00 333.50 325.00 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 0.75 1500.00 1833.33 1600.00 STA0091-030 SH 9 BETWEEN FAIRPLAY AND ALM 03/22/07 0.70 1000.00 1448.00 1225.00 SHE 0504-050 INTERSECTION OF SH 50B AND SH 03/22/07 1.40 1200.00 1031.25 787.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 252.28 512.69 408.00 415.59 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 15.00 423.99 412.84 370.00 NH 0405-025 KIT CARSON BRIDGE 04/26/07 15.00 444.91 414.42 400.00 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 12.50 1200.00 888.00 880.00 SHE 0251-175 ALONG I 25 NORTH OF THE CITY 04/26/07 7.97 550.00 611.87 491.40 STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 1.40 1066.86 1408.00 2015.00 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 5.00 800.00 309.38 277.50 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 12.00 550.00 410.11 445.00 STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 7.86 793.41 831.13 362.25 SHE0761-193 I-76: SHERIDAN TO I-25 (M.P. 05/17/07 10.50 600.00 1089.89 1013.65 IM0703-317 FROM MP 221.30 TO MP 251.30 J 05/17/07 13.00 372.56 642.33 300.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 97.00 400.00 391.14 389.54 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 0.90 1200.00 875.31 8.50 SHE 133A-032 SH 133 BETWEEN REDSTONE AND M 05/24/07 0.73 2000.00 1117.06 1515.00 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 0.17 1400.00 5000.00 5000.00 STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 1.70 800.00 906.67 500.00 BR 059A-032 ON SH 59 IN SEDGWICK COUNTY 06/07/07 0.16 1500.00 3503.25 4000.00 IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 3.00 750.00 1250.00 1000.00 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 2.30 1500.00 481.67 320.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 96.50 350.00 329.57 315.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 121 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00006 Seeding (Native) Acre =================================================== IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 1.60 1532.94 630.08 543.78 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 1.50 1500.00 1307.33 805.00 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 0.50 2000.00 3162.48 3210.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 306.29 490.53 473.71 432.47 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 26.23 650.00 2321.46 1880.55 BRR500-087 US 160 PAGOSA SPRINGS 07/12/07 0.30 2000.00 4740.00 2880.00 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 4.80 600.00 410.64 350.00 C065A-020 SH65 GRAND MESA SLIDE REPAIR 07/26/07 1.60 3000.00 1083.33 1150.00 SHE 0702-267 NEAR VAIL IN EAGLE COUNTY 08/02/07 15.00 495.00 2293.40 650.00 BR 0253-192 I-25&128TH 08/16/07 2.59 1500.00 601.95 875.00 CR100-126 WEST OF KIT CARSON 08/16/07 40.00 335.10 279.82 290.00 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 0.10 5000.00 10811.11 12000.00 C0701-190 26.5 ROAD/I-70 BRIDGE REPAIR 08/27/07 0.50 2000.00 2166.67 2000.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 3.70 2000.00 1074.88 995.00 C0701-187 I-70 20 ROAD BRIDGE REPAIR 09/06/07 0.25 2500.00 3242.98 3800.00 IM 0703-331 WB I-70 AT M.P. 259.70 AND M. 09/06/07 0.65 1200.00 1060.59 557.34 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 6.86 643.73 1742.88 632.76 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 0.92 1000.00 974.87 1179.49 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 103.50 634.63 1499.05 869.05 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 1.20 1500.00 2533.73 640.00 BR R300-130 I-70 (VARIOUS LOCATIONS) 10/18/07 0.15 1500.00 9600.00 17000.00 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 1.79 750.00 945.74 350.00 SHE0092-019 SH 9 NORTH OF SILVERTHORNE, I 10/18/07 0.70 1462.75 2240.00 1125.00 IM 0703-336 WB I-70 AT M.P. 259.70 AND M. 10/18/07 0.20 2684.00 3029.00 1366.00 STA 340A-013 SH 340 IN FRUITA 10/25/07 2.50 3000.00 4356.25 500.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 11.32 1848.75 1055.03 875.00 BR 0241-047 US 24, 2 MI S OF GRANITE, CHA 11/15/07 1.20 2000.00 3584.48 3382.67 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 5.00 550.00 1703.03 5046.19 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 1.00 1500.00 701.92 500.00 STSR400-229 SH 14, SH 93, & SH 157 IN BOU 12/06/07 1.00 1000.00 3784.50 4387.50 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 0.56 1200.00 1586.08 1350.00 CC 0821-084 SH82 ASPEN 12/20/07 5.00 700.00 1387.00 1232.00 SHE 160A-009 U.S. 160 MP 94.15 - MP 96.63 12/20/07 11.70 800.00 702.46 838.88 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 43.32 1258.96 1495.13 1548.22 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 705.39 566.79 690.75 559.01 =============== 212-00007 Seeding (Native) (Hydraulic) Acre =================================================== HB 149A-023 SOUTH FORK TO CREEDE - SHOULD 02/08/07 0.20 2500.00 3536.67 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 0.20 2500.00 3536.67 2500.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 122 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00007 Seeding (Native) (Hydraulic) Acre =================================================== NH 5502-055 COALBANK PASS 08/09/07 1.20 3500.00 5287.09 3354.17 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.20 3500.00 5287.09 3354.17 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.40 3357.14 4937.00 3232.15 =============== 212-00009 Seeding (Temporary) Acre =================================================== BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 4.00 700.00 320.33 159.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 700.00 320.33 159.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 700.00 320.33 159.00 =============== 212-00011 Seeding (Lawn) Acre =================================================== STA 340A-013 SH 340 IN FRUITA 10/25/07 0.90 3000.00 7056.25 4000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 0.90 3000.00 7056.25 4000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 0.90 3000.00 7056.25 4000.00 =============== 212-00015 Seeding (Forbs) Pound ================================================== CC 0821-084 SH82 ASPEN 12/20/07 16.00 200.00 135.00 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 16.00 200.00 135.00 55.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 200.00 135.00 55.00 =============== 212-00028 Seeding (Wetlands) Acre =================================================== NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 0.10 8000.00 11194.20 10800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 0.10 8000.00 11194.20 10800.00 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 0.60 1300.00 1910.00 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 0.60 1300.00 1910.00 2000.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 123 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00028 Seeding (Wetlands) Acre =================================================== HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 0.60 2000.00 1013.76 787.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 0.60 2000.00 1013.76 787.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.30 2138.46 1690.19 2117.31 =============== 212-00032 Soil Conditioning Acre =================================================== NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 1.30 2000.00 2810.00 3500.00 NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 0.50 2500.00 5296.67 4500.00 IM 0703-319 EJMT 24.9 KV SERVICE 01/25/07 0.25 5000.00 2543.32 2952.00 STA 0661-009 ON SH 66 IN WELD COUNTY 02/01/07 1.50 1900.00 3297.93 2784.00 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 2.00 1550.00 3525.13 2300.00 STA 086A-045 SH 86 - FRANKTOWN TO ELBERT C 02/01/07 0.10 5000.00 5025.00 2445.00 STA 1251-005 SH 125 AND 127 NORTH OF COWDR 02/08/07 0.30 3000.00 7204.50 7500.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 1.20 3300.00 2966.17 7020.00 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 0.50 2000.00 3000.00 1200.00 STA0091-030 SH 9 BETWEEN FAIRPLAY AND ALM 03/22/07 0.70 5000.00 2704.00 3630.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.35 2504.19 3430.03 3637.54 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 15.00 2096.85 2970.43 2600.00 NH 0405-025 KIT CARSON BRIDGE 04/26/07 15.00 2096.85 2819.49 2600.00 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 12.50 1700.00 275.33 300.00 STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 0.70 3793.61 1674.00 1870.00 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 12.00 1800.00 3354.94 3512.00 STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 7.86 1884.85 2400.00 3400.00 SHE0761-193 I-76: SHERIDAN TO I-25 (M.P. 05/17/07 10.50 3500.00 3115.09 4253.45 IM0703-317 FROM MP 221.30 TO MP 251.30 J 05/17/07 13.00 2349.79 3780.33 2800.00 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 0.90 2500.00 3462.15 3662.00 SHE 133A-032 SH 133 BETWEEN REDSTONE AND M 05/24/07 0.73 2000.00 3759.31 2423.50 STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 1.70 2500.00 3858.33 4000.00 BR 059A-032 ON SH 59 IN SEDGWICK COUNTY 06/07/07 0.16 5000.00 6216.75 7000.00 IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 3.00 3000.00 2950.00 4000.00 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 2.30 2000.00 3033.33 3400.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 96.50 1750.00 2412.88 2350.00 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 1.60 3243.33 1426.19 1305.06 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 1.50 2500.00 3789.67 5100.00 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 0.50 2000.00 3144.32 3262.43 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 195.45 2004.08 2652.32 2578.34 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 124 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00032 Soil Conditioning Acre =================================================== HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 26.23 4000.00 3878.71 3814.65 BRR500-087 US 160 PAGOSA SPRINGS 07/12/07 0.30 3000.00 2700.00 2500.00 C065A-020 SH65 GRAND MESA SLIDE REPAIR 07/26/07 1.60 2500.00 3766.67 5300.00 NH 5502-055 COALBANK PASS 08/09/07 1.20 2000.00 2364.59 3354.17 BR 0253-192 I-25&128TH 08/16/07 2.59 2000.00 3326.48 3200.00 CR100-126 WEST OF KIT CARSON 08/16/07 40.00 1910.50 2886.61 2900.00 C0701-187 I-70 20 ROAD BRIDGE REPAIR 09/06/07 0.25 2500.00 5445.43 10200.00 IM 0703-331 WB I-70 AT M.P. 259.70 AND M. 09/06/07 0.65 2000.00 2220.59 557.34 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 6.86 1800.00 2658.07 1500.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 0.92 3300.00 3570.90 2743.59 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 80.60 2619.47 3402.54 3143.02 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 1.79 750.00 3951.75 5750.00 SHE0092-019 SH 9 NORTH OF SILVERTHORNE, I 10/18/07 0.70 3275.75 5463.99 3749.95 IM 0703-336 WB I-70 AT M.P. 259.70 AND M. 10/18/07 0.20 6891.75 4272.50 990.00 STA 340A-013 SH 340 IN FRUITA 10/25/07 2.50 2500.00 8081.25 2200.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 6.70 3227.00 2161.56 1300.00 BR 0241-047 US 24, 2 MI S OF GRANITE, CHA 11/15/07 1.20 1500.00 2588.14 4465.13 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 1.00 3000.00 3967.17 3800.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 0.56 3500.00 3944.34 1000.00 SHE 160A-009 U.S. 160 MP 94.15 - MP 96.63 12/20/07 11.70 2000.00 936.22 588.82 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 26.35 2392.59 2508.35 1667.28 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 310.75 2210.08 2883.66 2676.01 =============== 212-00040 Soil Preparation (Lawn) Acre =================================================== STA 340A-013 SH 340 IN FRUITA 10/25/07 0.90 2500.00 8681.25 5600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 0.90 2500.00 8681.25 5600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 0.90 2500.00 8681.25 5600.00 =============== 212-00047 Soil Preparation (Spec) Acre =================================================== CC 0821-084 SH82 ASPEN 12/20/07 1.10 2000.00 7075.00 7150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.10 2000.00 7075.00 7150.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.10 2000.00 7075.00 7150.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 125 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00050 Sod Sq Foot ================================================ STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 1,660.00 1.00 1.23 1.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,660.00 1.00 1.23 1.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,660.00 1.00 1.23 1.10 =============== 212-00100 Tree Retention and Protection LUMP SUM =============================================== CC 0821-084 SH82 ASPEN 12/20/07 1.00 2000.00 10841.67 5500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 2000.00 10841.67 5500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2000.00 10841.67 5500.00 =============== 212-00900 Compost Cubic Yard ============================================= CC 0821-084 SH82 ASPEN 12/20/07 806.00 20.00 58.12 57.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 806.00 20.00 58.12 57.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 806.00 20.00 58.12 57.20 =============== 213-00000 Mulching Acre =================================================== CC 0821-084 SH82 ASPEN 12/20/07 6.10 1800.00 1172.17 1408.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.10 1800.00 1172.17 1408.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.10 1800.00 1172.17 1408.00 =============== 213-00001 Mulching Ton ==================================================== BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 1.30 708.28 485.49 513.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.30 708.28 485.49 513.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.30 708.28 485.49 513.00 =============== 213-00002 Mulching (Weed Free Hay) Acre =================================================== STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 15.00 500.00 422.83 440.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 126 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00002 Mulching (Weed Free Hay) Acre =================================================== STA 012A-042 SH 12, S. OF LA VETA 01/18/07 29.00 500.00 482.33 329.00 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 1.30 750.00 903.00 800.00 STA 069A-021 SH 69, W. OF WALSENBURG 01/25/07 30.00 500.00 378.50 570.00 NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 0.50 1250.00 1013.67 600.00 IM 0703-319 EJMT 24.9 KV SERVICE 01/25/07 0.25 3000.00 1613.56 1652.00 IM 0253-194 ON I-25 IN WELD COUNTY 01/25/07 50.00 500.00 301.67 260.00 STA 0661-009 ON SH 66 IN WELD COUNTY 02/01/07 2.00 1500.00 776.05 671.00 STA 086A-045 SH 86 - FRANKTOWN TO ELBERT C 02/01/07 0.10 4000.00 5698.60 4840.00 SHE 1151-020 SH 115 VMS, MP 17 AND MP 41 02/15/07 0.15 3200.00 3992.53 1601.78 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 1.30 1300.00 2463.08 5400.00 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 1.18 1200.00 1492.17 1200.00 SHE 1151-018 SH 115 - GUMAER AVENUE EAST 03/08/07 0.40 1400.00 2594.50 2957.00 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 0.25 1200.00 2000.00 2000.00 STA0091-030 SH 9 BETWEEN FAIRPLAY AND ALM 03/22/07 0.70 1000.00 1491.00 1275.00 SHE 0504-050 INTERSECTION OF SH 50B AND SH 03/22/07 1.40 1200.00 897.92 787.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 133.53 558.50 489.02 465.62 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 17.00 516.24 391.81 400.00 NH 0405-025 KIT CARSON BRIDGE 04/26/07 13.50 468.85 318.34 300.00 STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 1.40 828.57 1032.00 860.00 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 7.00 800.00 418.23 432.90 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 16.00 500.00 447.58 348.50 STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 7.86 533.80 1047.13 569.25 IM0703-317 FROM MP 221.30 TO MP 251.30 J 05/17/07 13.00 614.34 752.67 500.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 137.00 400.00 321.16 319.63 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 0.86 1200.00 982.56 941.50 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 0.17 1200.00 4000.00 3000.00 STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 1.70 800.00 798.33 375.00 BR 059A-032 ON SH 59 IN SEDGWICK COUNTY 06/07/07 0.16 1500.00 3825.13 5000.00 IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 3.00 700.00 1250.00 1000.00 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 2.30 800.00 561.67 475.00 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 1.60 1262.25 732.91 728.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 222.55 474.69 407.29 374.92 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 26.23 700.00 847.23 787.50 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 4.80 450.00 647.55 575.00 SHE 0702-267 NEAR VAIL IN EAGLE COUNTY 08/02/07 15.00 395.00 957.20 500.00 CR100-126 WEST OF KIT CARSON 08/16/07 50.00 390.54 502.11 275.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 1.40 1000.00 1162.13 1218.50 IM 0703-331 WB I-70 AT M.P. 259.70 AND M. 09/06/07 0.65 1200.00 1205.25 835.98 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 127 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00002 Mulching (Weed Free Hay) Acre =================================================== C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 6.86 480.00 1454.42 520.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 104.94 490.24 753.52 481.06 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 1.50 750.00 979.25 295.00 SHE0092-019 SH 9 NORTH OF SILVERTHORNE, I 10/18/07 0.70 1556.50 1993.00 750.00 IM 0703-336 WB I-70 AT M.P. 259.70 AND M. 10/18/07 0.20 2625.75 2385.00 340.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 17.78 1225.75 900.96 450.00 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 5.00 300.00 479.24 454.16 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 25.18 1033.90 851.47 449.06 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 486.20 530.03 547.68 426.58 =============== 213-00003 Mulching (Weed Free) Acre =================================================== STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 77.00 300.00 291.26 300.00 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 110.00 500.00 256.50 235.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 187.00 417.65 269.31 261.76 SHE0761-193 I-76: SHERIDAN TO I-25 (M.P. 05/17/07 10.50 600.00 1172.58 956.50 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 100.00 250.00 275.63 280.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 1.50 1500.00 1365.00 805.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 112.00 299.55 389.39 350.45 BR 0253-192 I-25&128TH 08/16/07 0.90 1500.00 639.83 610.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 0.90 1500.00 639.83 610.00 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 1.20 1000.00 713.64 530.00 BR 0241-047 US 24, 2 MI S OF GRANITE, CHA 11/15/07 1.20 1000.00 922.75 1369.98 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 0.56 1200.00 1128.42 950.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.96 1037.84 843.65 949.99 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 302.86 383.25 316.00 302.32 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 128 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00004 Mulching (Weed Free Straw) Acre =================================================== STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 3.00 535.00 802.00 920.00 STA 1251-005 SH 125 AND 127 NORTH OF COWDR 02/08/07 0.30 3000.00 1775.00 1200.00 SHE 5502-054 02/22/07 0.40 2500.00 1952.05 1980.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.70 947.30 1005.22 1057.30 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 12.90 1200.00 1036.67 1100.00 SHE 133A-032 SH 133 BETWEEN REDSTONE AND M 05/24/07 0.73 2000.00 2060.00 1575.00 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 0.50 2000.00 3590.70 3745.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 14.13 1269.64 1301.01 1218.14 BRR500-087 US 160 PAGOSA SPRINGS 07/12/07 0.30 2000.00 2590.00 2880.00 C065A-020 SH65 GRAND MESA SLIDE REPAIR 07/26/07 1.60 3000.00 1266.67 1800.00 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 0.10 6000.00 11388.89 10000.00 C0701-190 26.5 ROAD/I-70 BRIDGE REPAIR 08/27/07 0.50 2000.00 1733.33 2000.00 C0701-187 I-70 20 ROAD BRIDGE REPAIR 09/06/07 0.25 2500.00 2665.29 3300.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 0.92 850.00 1005.00 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.67 2290.74 1624.42 2040.60 STA 340A-013 SH 340 IN FRUITA 10/25/07 3.40 2100.00 1878.75 1100.00 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 1.00 1500.00 802.48 620.00 CC 0821-084 SH82 ASPEN 12/20/07 6.30 1800.00 1172.17 1408.00 SHE 160A-009 U.S. 160 MP 94.15 - MP 96.63 12/20/07 11.70 1100.00 793.82 779.24 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 22.40 1466.52 1073.17 997.66 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 43.90 1428.29 1157.09 1160.84 =============== 213-00005 Mulching (Decorative) Cubic Foot ============================================= STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 945.00 3.00 5.62 3.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 945.00 3.00 5.62 3.45 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 129 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00005 Mulching (Decorative) Cubic Foot ============================================= BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 6,140.00 2.00 3.02 2.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6,140.00 2.00 3.02 2.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,085.00 2.13 3.63 2.63 =============== 213-00008 Mulching (Wood Chip) Cubic Foot ============================================= STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 837.00 3.00 4.56 3.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 837.00 3.00 4.56 3.45 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 729.00 3.25 4.04 4.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 24.00 4.00 20.60 48.00 CC 0821-084 SH82 ASPEN 12/20/07 24.00 20.00 13.38 15.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 777.00 3.79 4.65 5.72 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,614.00 3.38 4.60 4.54 =============== 213-00011 Mulching (Hydraulic) Acre =================================================== HB 149A-023 SOUTH FORK TO CREEDE - SHOULD 02/08/07 0.20 1000.00 3536.67 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 0.20 1000.00 3536.67 2500.00 SHE 0251-175 ALONG I 25 NORTH OF THE CITY 04/26/07 7.97 550.00 1105.37 950.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7.97 550.00 1105.37 950.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.17 561.02 1141.43 988.19 =============== 213-00061 Mulch Tackifier Pound ================================================== STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 15,400.00 1.80 1.67 1.65 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 130 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00061 Mulch Tackifier Pound ================================================== STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 3,000.00 2.00 1.87 1.80 STA 012A-042 SH 12, S. OF LA VETA 01/18/07 4,000.00 2.00 2.05 1.90 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 260.00 3.75 2.84 3.00 STA 069A-021 SH 69, W. OF WALSENBURG 01/25/07 6,000.00 2.00 1.84 2.25 NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 100.00 4.00 3.82 5.00 IM 0703-319 EJMT 24.9 KV SERVICE 01/25/07 30.00 10.00 14.22 12.03 IM 0253-194 ON I-25 IN WELD COUNTY 01/25/07 10,000.00 4.00 2.00 1.50 STA 0661-009 ON SH 66 IN WELD COUNTY 02/01/07 400.00 3.50 2.38 2.00 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 600.00 2.00 3.24 4.30 STA 086A-045 SH 86 - FRANKTOWN TO ELBERT C 02/01/07 20.00 35.00 12.85 2.75 STA 1251-005 SH 125 AND 127 NORTH OF COWDR 02/08/07 60.00 8.00 11.25 10.00 HB 149A-023 SOUTH FORK TO CREEDE - SHOULD 02/08/07 40.00 3.00 13.33 7.00 SHE 1151-020 SH 115 VMS, MP 17 AND MP 41 02/15/07 23.00 6.00 19.17 18.57 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 260.00 6.50 2.90 3.24 SHE 5502-054 02/22/07 80.00 6.00 7.71 7.70 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 118.00 6.00 6.72 7.50 SHE 1151-018 SH 115 - GUMAER AVENUE EAST 03/08/07 100.00 3.50 10.59 10.80 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 22,000.00 1.80 1.41 1.45 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 88.00 5.00 3.07 4.70 STA0091-030 SH 9 BETWEEN FAIRPLAY AND ALM 03/22/07 540.00 2.00 3.93 1.90 SHE 0504-050 INTERSECTION OF SH 50B AND SH 03/22/07 190.00 5.00 3.59 2.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 63,309.00 2.29 1.78 1.74 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 3,400.00 1.78 1.79 1.80 NH 0405-025 KIT CARSON BRIDGE 04/26/07 2,700.00 1.85 1.61 1.60 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 2,600.00 8.00 2.33 2.50 STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 490.00 2.82 1.92 3.25 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 1,409.00 2.00 2.06 1.85 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 3,200.00 1.66 1.81 1.50 STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 1,572.00 2.51 2.18 1.85 SHE0761-193 I-76: SHERIDAN TO I-25 (M.P. 05/17/07 2,100.00 2.00 2.27 2.12 IM0703-317 FROM MP 221.30 TO MP 251.30 J 05/17/07 2,600.00 2.08 2.08 2.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 27,400.00 2.00 1.26 1.15 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 172.00 4.00 3.36 3.50 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 51.00 6.00 20.00 15.00 STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 340.00 2.50 2.49 2.00 BR 059A-032 ON SH 59 IN SEDGWICK COUNTY 06/07/07 32.00 10.00 18.00 13.00 IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 580.00 2.75 3.25 2.50 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 460.00 2.00 2.23 2.35 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 20,000.00 2.00 1.61 1.60 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 320.00 2.97 2.21 2.18 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 400.00 5.00 2.63 2.00 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 100.00 6.00 5.17 5.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 69,926.00 2.26 1.64 1.56 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 131 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00061 Mulch Tackifier Pound ================================================== HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 5,246.00 2.00 2.14 1.70 BRR500-087 US 160 PAGOSA SPRINGS 07/12/07 60.00 10.00 5.00 7.00 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 480.00 2.50 2.79 2.00 C065A-020 SH65 GRAND MESA SLIDE REPAIR 07/26/07 320.00 8.00 3.47 2.40 SHE 0702-267 NEAR VAIL IN EAGLE COUNTY 08/02/07 3,080.00 1.95 3.80 2.50 BR 0253-192 I-25&128TH 08/16/07 180.00 3.00 1.67 1.75 CR100-126 WEST OF KIT CARSON 08/16/07 10,000.00 1.44 1.61 1.50 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 20.00 10.00 6.28 7.00 C0701-190 26.5 ROAD/I-70 BRIDGE REPAIR 08/27/07 50.00 2.00 52.67 2.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 280.00 2.50 5.31 4.50 C0701-187 I-70 20 ROAD BRIDGE REPAIR 09/06/07 38.00 15.00 7.83 13.50 IM 0703-331 WB I-70 AT M.P. 259.70 AND M. 09/06/07 125.00 3.00 4.15 1.34 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 1,372.00 2.00 2.81 2.15 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 92.00 6.00 4.63 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 21,343.00 1.92 2.36 1.87 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 240.00 2.00 2.59 3.20 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 300.00 3.00 2.74 1.65 SHE0092-019 SH 9 NORTH OF SILVERTHORNE, I 10/18/07 140.00 5.00 5.83 2.65 IM 0703-336 WB I-70 AT M.P. 259.70 AND M. 10/18/07 40.00 7.50 11.45 3.80 STA 340A-013 SH 340 IN FRUITA 10/25/07 676.00 4.00 7.13 5.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 3,376.00 2.50 2.28 2.00 BR 0241-047 US 24, 2 MI S OF GRANITE, CHA 11/15/07 120.00 6.00 4.11 3.38 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 500.00 2.00 2.67 2.27 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 100.00 4.00 4.06 2.90 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 131.00 2.50 3.55 2.35 CC 0821-084 SH82 ASPEN 12/20/07 915.00 3.25 3.06 3.10 SHE 160A-009 U.S. 160 MP 94.15 - MP 96.63 12/20/07 2,400.00 2.50 4.30 3.81 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8,938.00 2.79 3.14 2.91 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 163,516.00 2.25 1.91 1.75 =============== 213-00070 Landscape Weed Barr Fabric Sq Yard ================================================ CC 0821-084 SH82 ASPEN 12/20/07 11.00 20.00 11.62 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 11.00 20.00 11.62 11.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 20.00 11.62 11.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 132 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00100 Soil Binder Acre =================================================== HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 1.00 1791.77 565.92 380.00 NH 0405-025 KIT CARSON BRIDGE 04/26/07 1.50 1693.33 507.00 450.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 40.00 400.00 297.42 279.66 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 0.90 1000.00 698.56 732.50 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 20.00 400.00 317.84 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 63.40 461.07 325.56 298.12 BR 0253-192 I-25&128TH 08/16/07 2.59 550.00 398.65 411.00 CR100-126 WEST OF KIT CARSON 08/16/07 20.00 400.19 411.00 475.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 7.00 450.00 533.69 375.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 29.59 425.09 438.08 445.86 CC 0821-084 SH82 ASPEN 12/20/07 4.00 500.00 832.00 418.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 500.00 832.00 418.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 96.99 451.70 389.29 348.14 =============== 213-00150 Bonded Fiber Matrix Acre =================================================== NH 5502-055 COALBANK PASS 08/09/07 0.20 5000.00 9207.50 5750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 0.20 5000.00 9207.50 5750.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 0.20 5000.00 9207.50 5750.00 =============== 213-00440 Landscape Border (1/8x4 In) Lin Foot =============================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 1,050.00 4.00 4.66 3.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,050.00 4.00 4.66 3.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,050.00 4.00 4.66 3.50 =============== 213-00460 Landscape Border (3/16x4 In) Lin Foot =============================================== STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 63.00 10.00 4.35 4.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 63.00 10.00 4.35 4.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 63.00 10.00 4.35 4.65 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 133 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00700 Landscape Boulder Each =================================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 720.00 75.00 256.94 215.00 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 6.00 400.00 480.51 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 726.00 77.69 258.33 217.36 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 726.00 77.69 258.33 217.36 =============== 213-00705 Landscape Boulder (Special) Each =================================================== BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 25.00 30.00 337.03 639.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 25.00 30.00 337.03 639.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25.00 30.00 337.03 639.50 =============== 214-00000 Landscape Maintenance LUMP SUM =============================================== STA 0661-009 ON SH 66 IN WELD COUNTY 02/01/07 1.00 10000.00 4165.55 2400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 10000.00 4165.55 2400.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 1.00 10000.00 38501.75 30457.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 10000.00 38501.75 30457.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 1.00 10202.00 9367.19 18000.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 1.00 10000.00 7535.19 3500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 10101.00 8582.05 10750.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 10050.50 11278.97 13589.25 =============== 214-00155 Plant (B and B) Each =================================================== CC 0821-084 SH82 ASPEN 12/20/07 47.00 100.00 232.13 217.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 47.00 100.00 232.13 217.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 47.00 100.00 232.13 217.80 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 134 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 214-00205 Deciduous Tree (5 Gal) Each =================================================== BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 4.00 125.00 101.67 151.39 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 35.00 80.00 79.02 64.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 39.00 84.62 81.68 72.96 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 39.00 84.62 81.68 72.96 =============== 214-00215 Deciduous Tree (1.5 In C) Each =================================================== STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 3.00 325.00 401.25 460.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 325.00 401.25 460.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 28.00 288.00 350.89 260.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 12.00 80.00 515.13 450.00 CC 0821-084 SH82 ASPEN 12/20/07 11.00 200.00 288.95 205.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 51.00 220.08 372.27 292.99 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 54.00 225.91 374.07 302.27 =============== 214-00220 Deciduous Tree (2 In C) Each =================================================== STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 70.00 200.00 617.67 525.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 70.00 200.00 617.67 525.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 16.00 400.00 492.48 403.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 16.00 400.00 492.48 403.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 17.00 484.75 435.79 260.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 17.00 484.75 435.79 260.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 103.00 278.07 537.80 462.31 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 135 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 214-00225 Deciduous Tree (2.5 In C) Each =================================================== STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 6.00 450.00 578.63 626.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 450.00 578.63 626.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 450.00 578.63 626.00 =============== 214-00230 Deciduous Tree (3 In C) Each =================================================== NH 1601-056 US 160 @ ROOSA AVE 08/23/07 5.00 900.00 588.89 650.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 30.00 600.00 490.19 518.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 35.00 642.86 497.78 536.86 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 35.00 642.86 497.78 536.86 =============== 214-00280 Deciduous Tree (8 Ft) Each =================================================== STA 0661-009 ON SH 66 IN WELD COUNTY 02/01/07 10.00 300.00 203.69 154.00 SHE 5502-054 02/22/07 6.00 600.00 564.38 539.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16.00 412.50 299.16 298.38 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 20.00 550.00 242.92 190.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20.00 550.00 242.92 190.00 CC 0821-084 SH82 ASPEN 12/20/07 212.00 250.00 238.95 216.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 212.00 250.00 238.95 216.70 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 248.00 284.68 244.67 219.82 =============== 214-00350 Deciduous Shrub (5 Gal) Each =================================================== STA 0661-009 ON SH 66 IN WELD COUNTY 02/01/07 20.00 30.00 36.39 27.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 136 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 214-00350 Deciduous Shrub (5 Gal) Each =================================================== STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 108.00 40.00 48.56 67.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 128.00 38.44 46.27 60.75 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 431.00 40.00 52.10 56.00 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 75.00 45.00 53.58 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 506.00 40.74 52.27 55.11 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 125.00 49.00 39.23 23.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 125.00 49.00 39.23 23.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 759.00 41.71 47.43 50.77 =============== 214-00370 Deciduous Shrub (7 Gal) Each =================================================== SHE 5502-054 02/22/07 48.00 50.00 97.93 57.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 48.00 50.00 97.93 57.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 48.00 50.00 97.93 57.20 =============== 214-00508 Evergreen Tree (8 Ft)(B-B) Each =================================================== SHE 5502-054 02/22/07 22.00 600.00 569.59 655.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 22.00 600.00 569.59 655.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 26.00 692.75 764.39 600.00 CC 0821-084 SH82 ASPEN 12/20/07 187.00 400.00 517.00 572.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 213.00 435.73 555.69 575.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 235.00 451.11 556.94 582.87 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 137 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 214-00510 Evergreen Tree(10 Ft)(B-B) Each =================================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 12.00 700.00 876.06 863.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.00 700.00 876.06 863.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 700.00 876.06 863.00 =============== 214-00512 Evergreen Tree(12 Ft)(B-B) Each =================================================== CC 0821-084 SH82 ASPEN 12/20/07 12.00 400.00 931.67 825.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 12.00 400.00 931.67 825.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 400.00 931.67 825.00 =============== 214-00601 Evergreen Shrub (Tubeling) Each =================================================== CC 0821-084 SH82 ASPEN 12/20/07 450.00 4.00 8.67 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 450.00 4.00 8.67 11.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 450.00 4.00 8.67 11.00 =============== 214-00650 Evergreen Shrub (5 Gal) Each =================================================== STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 10.00 50.00 58.63 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 50.00 58.63 75.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 35.00 60.00 52.60 56.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 35.00 60.00 52.60 56.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 45.00 57.78 54.79 60.22 =============== 214-00905 Perennials (2.25 In Pot) Each =================================================== STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 100.00 3.00 6.89 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 100.00 3.00 6.89 7.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 100.00 3.00 6.89 7.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 138 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 214-00910 Perennials (1 Gal) Each =================================================== CC 0821-084 SH82 ASPEN 12/20/07 28.00 20.00 20.07 27.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 28.00 20.00 20.07 27.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 28.00 20.00 20.07 27.50 =============== 214-00950 Perennials (5 Gal) Each =================================================== STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 55.00 40.00 54.91 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 55.00 40.00 54.91 55.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 55.00 40.00 54.91 55.00 =============== 214-01010 Brush Layer Cutting Each =================================================== STA 0661-009 ON SH 66 IN WELD COUNTY 02/01/07 1,600.00 5.00 2.77 3.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 500.00 5.00 3.58 5.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,100.00 5.00 2.84 3.57 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 1,000.00 4.00 7.57 7.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 160.00 5.00 4.33 1.72 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,160.00 4.14 7.00 6.27 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 600.00 50.00 3.25 3.15 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 200.00 10.00 15.10 15.00 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 200.00 5.00 9.05 4.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,000.00 33.00 5.34 5.84 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 100.00 13.00 9.20 26.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 139 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 214-01010 Brush Layer Cutting Each =================================================== BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 100.00 4.50 5.62 7.06 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 200.00 8.75 7.53 16.53 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,460.00 11.22 4.15 5.36 =============== 214-01015 Willow Cuttings Each =================================================== IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 500.00 3.00 4.07 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 500.00 3.00 4.07 2.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 500.00 3.00 4.07 2.00 =============== 214-01025 Dormant Log Cutting Each =================================================== C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 6.00 30.00 169.67 145.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 30.00 169.67 145.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 30.00 169.67 145.00 =============== 215-00000 Transplant Shrub Each =================================================== HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 10.00 75.00 385.53 783.22 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 75.00 385.53 783.22 STA 340A-013 SH 340 IN FRUITA 10/25/07 6.00 650.00 531.25 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 650.00 531.25 1100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 290.63 419.16 902.01 =============== 215-00600 Transplant Plug Each =================================================== NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 50.00 10.00 5.05 10.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 50.00 10.00 5.05 10.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 10.00 5.05 10.80 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 140 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 216-00015 Soil Reten Blanket (Excel) Sq Yard ================================================ STA 1251-005 SH 125 AND 127 NORTH OF COWDR 02/08/07 267.00 5.00 4.63 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 267.00 5.00 4.63 4.00 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 610.00 2.00 7.50 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 610.00 2.00 7.50 10.00 SHE 0702-267 NEAR VAIL IN EAGLE COUNTY 08/02/07 1,600.00 1.95 3.30 2.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,600.00 1.95 3.30 2.50 BR 0241-047 US 24, 2 MI S OF GRANITE, CHA 11/15/07 1,500.00 6.00 2.91 6.91 SHE 160A-009 U.S. 160 MP 94.15 - MP 96.63 12/20/07 200.00 6.00 11.90 7.88 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,700.00 6.00 3.47 7.02 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,177.00 3.80 3.70 5.53 =============== 216-00021 Soil Reten Blanket (Cl 1) Sq Yard ================================================ STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 2,260.00 3.00 1.44 1.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,260.00 3.00 1.44 1.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,260.00 3.00 1.44 1.25 =============== 216-00022 Soil Reten Blanket (Cl 2) Sq Yard ================================================ STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 620.00 5.00 2.28 1.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 620.00 5.00 2.28 1.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 620.00 5.00 2.28 1.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 141 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 216-00030 Soil Reten Blanket (Spec) Sq Yard ================================================ IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 283.00 10.00 13.75 14.98 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 283.00 10.00 13.75 14.98 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 600.00 4.00 2.42 3.03 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 194.00 4.00 2.30 1.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 794.00 4.00 2.40 2.68 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,077.00 5.58 4.37 5.91 =============== 216-00035 Soil Reten Blanket (Plastic) Sq Yard ================================================ STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 588.00 10.00 13.66 2.25 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 8,310.00 9.50 11.33 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8,898.00 9.53 11.62 4.82 STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 300.00 10.09 7.62 6.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 300.00 10.09 7.62 6.10 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 250.00 15.00 9.51 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 250.00 15.00 9.51 9.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,448.00 9.70 11.36 4.97 =============== 216-00037 Soil Reten Blanket (Coconut) Sq Yard ================================================ BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 388.00 2.00 2.27 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 388.00 2.00 2.27 2.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 142 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 216-00037 Soil Reten Blanket (Coconut) Sq Yard ================================================ STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 1,393.00 3.00 2.78 1.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,393.00 3.00 2.78 1.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,781.00 2.78 2.61 1.49 =============== 216-00039 Soil Reten Blanket (Straw) Sq Yard ================================================ SHE 0504-050 INTERSECTION OF SH 50B AND SH 03/22/07 1,132.00 4.00 2.78 2.63 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,132.00 4.00 2.78 2.63 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 3,581.00 3.50 3.00 2.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,581.00 3.50 3.00 2.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,713.00 3.62 2.91 2.53 =============== 216-00041 Soil Reten Blanket (S/C) Sq Yard ================================================ STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 200.00 3.00 4.21 6.50 STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 200.00 3.00 2.21 1.55 STA 0661-009 ON SH 66 IN WELD COUNTY 02/01/07 392.00 3.50 2.53 2.00 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 1,031.00 2.00 2.58 2.25 STA 086A-045 SH 86 - FRANKTOWN TO ELBERT C 02/01/07 170.00 6.50 4.80 3.15 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 650.00 3.00 4.10 4.50 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 1,300.00 2.00 1.97 2.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,943.00 2.61 2.87 2.81 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 400.00 2.63 2.17 1.30 NH 0405-025 KIT CARSON BRIDGE 04/26/07 7,260.00 1.51 1.51 1.50 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 896.00 2.00 1.73 1.40 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 6,437.00 3.50 1.73 1.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 143 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 216-00041 Soil Reten Blanket (S/C) Sq Yard ================================================ SHE0761-193 I-76: SHERIDAN TO I-25 (M.P. 05/17/07 80.00 2.00 7.37 12.30 IM0703-317 FROM MP 221.30 TO MP 251.30 J 05/17/07 21,409.00 1.44 2.00 1.50 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 68,788.00 1.50 1.35 1.40 IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 2,945.00 1.75 2.00 2.00 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 762.00 3.00 2.87 2.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 8,397.00 1.50 1.24 1.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 117,374.00 1.62 1.50 1.44 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 27,953.00 2.00 1.90 1.52 BR 0253-192 I-25&128TH 08/16/07 8,657.00 2.00 1.27 1.30 CR100-126 WEST OF KIT CARSON 08/16/07 50.00 4.92 3.22 3.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 500.00 5.00 4.26 4.00 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 637.00 3.50 2.76 2.35 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 1,500.00 1.20 2.25 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 39,297.00 2.04 1.83 1.54 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 750.00 2.00 2.13 2.10 BR R300-130 I-70 (VARIOUS LOCATIONS) 10/18/07 227.00 4.00 8.25 1.75 STA 340A-013 SH 340 IN FRUITA 10/25/07 914.00 3.00 5.09 5.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 1,500.00 3.00 2.21 1.95 CC 0821-084 SH82 ASPEN 12/20/07 910.00 3.00 5.89 3.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,301.00 2.88 3.47 2.86 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 164,915.00 1.78 1.74 1.53 =============== 217-00020 Herbicide Treatment Hour =================================================== STA 0661-009 ON SH 66 IN WELD COUNTY 02/01/07 10.00 195.00 189.20 154.00 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 1.00 109.00 420.38 160.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 4.00 180.00 239.25 135.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15.00 185.27 206.04 149.33 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 4.00 130.00 279.33 210.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 144 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 217-00020 Herbicide Treatment Hour =================================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 40.00 100.00 147.46 139.83 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 8.00 150.00 270.35 569.50 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 20.00 120.00 155.00 170.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 72.00 112.78 178.42 199.85 BR 0253-192 I-25&128TH 08/16/07 2.00 120.00 165.15 170.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 20.00 150.00 145.31 152.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 22.00 147.27 147.52 154.09 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 16.00 124.00 226.49 250.00 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 10.00 140.00 193.33 184.79 CC 0821-084 SH82 ASPEN 12/20/07 10.00 100.00 231.25 247.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 36.00 121.78 218.60 231.19 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 145.00 127.74 192.80 195.46 =============== 250-00010 Envir Health/Safety Mngmt LUMP SUM =============================================== NH 1602-102 WITHIN THE ALAMOSA CITY LIMIT 02/15/07 1.00 4000.00 5900.00 6300.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 1.00 6500.00 7285.31 8611.92 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 5250.00 6731.18 7455.96 NH 0405-025 KIT CARSON BRIDGE 04/26/07 1.00 3877.98 4811.57 4600.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 1.00 5000.00 4094.99 3945.97 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 1.00 4500.00 2986.00 2700.00 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 1.00 5000.00 4564.51 4204.03 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 4594.50 4251.99 3862.50 BRR500-087 US 160 PAGOSA SPRINGS 07/12/07 1.00 5000.00 2410.00 3720.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 145 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 250-00010 Envir Health/Safety Mngmt LUMP SUM =============================================== C0702-273 I-70 GLENWOOD CANYON 08/09/07 1.00 5000.00 750.00 750.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 1.00 5000.00 3829.38 4525.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 5000.00 2983.93 2998.50 IM 0703-326 EISENHOWER JOHNSON MEMORIAL T 12/06/07 1.00 24700.00 40327.54 10000.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 1.00 5000.00 5626.86 4400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 14850.00 17193.75 7200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 6688.91 7328.80 4887.04 =============== 250-00050 Monitoring Technician Hour =================================================== NH 1602-102 WITHIN THE ALAMOSA CITY LIMIT 02/15/07 20.00 90.00 132.50 140.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 150.00 110.00 99.63 92.88 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 170.00 107.65 102.31 98.42 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 100.00 75.00 95.22 92.87 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 16.00 100.00 96.33 87.00 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 40.00 80.00 109.22 105.23 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 156.00 78.85 100.68 95.44 BRR500-087 US 160 PAGOSA SPRINGS 07/12/07 8.00 100.00 412.00 74.00 BR 0253-192 I-25&128TH 08/16/07 32.00 80.00 85.82 100.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 56.00 90.00 90.24 115.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 96.00 87.50 101.34 106.88 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 422.00 92.42 101.33 99.24 =============== 250-00110 Health and Safety Officer Hour =================================================== NH 1602-102 WITHIN THE ALAMOSA CITY LIMIT 02/15/07 16.00 120.00 168.50 172.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 146 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 250-00110 Health and Safety Officer Hour =================================================== NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 200.00 160.00 134.96 134.87 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 216.00 157.04 136.66 137.62 NH 0405-025 KIT CARSON BRIDGE 04/26/07 40.00 94.51 114.46 110.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 100.00 125.00 124.14 117.57 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 4.00 200.00 145.33 131.00 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 20.00 130.00 150.50 141.03 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 164.00 120.00 127.51 118.91 BRR500-087 US 160 PAGOSA SPRINGS 07/12/07 16.00 150.00 107.50 105.00 BR 0253-192 I-25&128TH 08/16/07 8.00 100.00 115.71 125.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 60.00 110.00 99.25 127.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 84.00 116.67 102.21 122.98 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 100.00 140.00 96.14 58.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 100.00 140.00 96.14 58.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 564.00 137.23 118.23 115.88 =============== 250-00120 Material Sampling and Delivery Each =================================================== NH 1602-102 WITHIN THE ALAMOSA CITY LIMIT 02/15/07 8.00 150.00 250.00 250.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 100.00 215.00 153.23 103.68 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 108.00 210.19 158.13 114.52 NH 0405-025 KIT CARSON BRIDGE 04/26/07 8.00 510.99 203.45 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 510.99 203.45 200.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 18.00 150.00 132.12 160.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 18.00 150.00 132.12 160.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 134.00 220.06 157.12 125.80 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 147 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 250-00200 Material Handling (Stockpile) Cubic Yard ============================================= NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 800.00 85.00 42.00 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 800.00 85.00 42.00 20.00 BRR500-087 US 160 PAGOSA SPRINGS 07/12/07 300.00 50.00 25.50 16.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 93.00 40.00 20.88 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 393.00 47.63 23.73 15.76 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,193.00 72.69 36.73 18.60 =============== 250-00210 Solid Waste Disposal Cubic Yard ============================================= NH 1602-102 WITHIN THE ALAMOSA CITY LIMIT 02/15/07 35.00 75.00 73.75 87.50 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 500.00 65.00 78.11 64.58 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 535.00 65.65 77.92 66.08 NH 0405-025 KIT CARSON BRIDGE 04/26/07 3.00 137.81 316.60 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 137.81 316.60 400.00 BRR500-087 US 160 PAGOSA SPRINGS 07/12/07 300.00 75.00 54.00 56.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 93.00 50.00 59.66 45.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 393.00 69.08 56.17 53.52 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 931.00 67.33 70.76 61.85 =============== 250-00220 Hazardous Waste Disposal Cubic Yard ============================================= NH 1602-102 WITHIN THE ALAMOSA CITY LIMIT 02/15/07 5.00 150.00 262.50 300.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 100.00 260.00 211.38 157.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 105.00 254.76 213.03 164.67 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 148 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 250-00220 Hazardous Waste Disposal Cubic Yard ============================================= NH 0405-025 KIT CARSON BRIDGE 04/26/07 3.00 242.40 281.88 275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 242.40 281.88 275.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 108.00 254.42 215.60 167.73 =============== 304-01000 ABC (CL 1) Ton ==================================================== BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 1,107.00 25.00 25.05 19.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,107.00 25.00 25.05 19.10 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 2,069.00 40.00 32.25 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,069.00 40.00 32.25 25.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,176.00 34.77 28.77 22.94 =============== 304-01005 ABC (CL 1) Cubic Yard ============================================= HB 065A-019 SH 65 THRU CEDAREDGE 03/08/07 8.00 100.00 92.17 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 100.00 92.17 50.00 NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 8.00 100.00 97.00 86.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 100.00 97.00 86.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 100.00 94.10 68.00 =============== 304-02000 ABC (CL 2) Ton ==================================================== NH 1601-056 US 160 @ ROOSA AVE 08/23/07 327.00 35.00 49.60 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 327.00 35.00 49.60 65.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 327.00 35.00 49.60 65.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 149 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-02005 ABC (CL 2) Cubic Yard ============================================= C 0504-055 PUEBLO COUNTY, US-50C AT SALT 11/01/07 80.00 40.00 115.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 80.00 40.00 115.00 100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 80.00 40.00 115.00 100.00 =============== 304-03000 ABC (CL 3) Ton ==================================================== STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 10,858.00 15.00 20.92 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10,858.00 15.00 20.92 20.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10,858.00 15.00 20.92 20.00 =============== 304-05000 ABC (CL 5) Ton ==================================================== IM 0253-196 I-25: 48TH AVE TO US 36 225: 05/31/07 36.00 40.00 96.25 78.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 36.00 40.00 96.25 78.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 36.00 40.00 96.25 78.00 =============== 304-05006 ABC (CL 5)(Spec) Sq Yard ================================================ NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 37,225.00 4.00 12.16 10.24 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 37,225.00 4.00 12.16 10.24 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 37,225.00 4.00 12.16 10.24 =============== 304-06000 ABC (CL 6) Ton ==================================================== NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 656.00 12.00 17.90 15.00 NH 1602-102 WITHIN THE ALAMOSA CITY LIMIT 02/15/07 60.00 50.00 66.50 33.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 224.00 30.00 213.83 29.00 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 4,860.00 25.00 20.76 15.60 SHE 1151-018 SH 115 - GUMAER AVENUE EAST 03/08/07 202.00 40.00 37.62 34.20 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 489.00 26.00 38.92 27.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 150 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-06000 ABC (CL 6) Ton ==================================================== SHE 0504-050 INTERSECTION OF SH 50B AND SH 03/22/07 3,380.00 22.00 20.88 19.11 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9,871.00 23.73 23.47 18.14 SHE 165A-011 ALONG SH 165 N/O RYE 04/05/07 170.00 40.00 81.36 61.55 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 85.00 30.65 265.29 100.00 NH 030A-025 SH30 (HAVANA)- PARKER TO FLOR 04/19/07 11.00 40.00 48.54 27.30 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 13,007.00 20.00 22.67 21.00 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 1,684.00 25.00 21.86 18.45 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 2,008.00 23.39 29.49 31.50 IM0703-317 FROM MP 221.30 TO MP 251.30 J 05/17/07 3,122.00 27.48 38.08 35.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 183,183.00 20.00 12.04 8.71 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 819.00 25.00 25.22 46.50 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 738.00 30.00 55.00 60.00 BR 059A-032 ON SH 59 IN SEDGWICK COUNTY 06/07/07 180.00 45.00 43.40 47.00 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 291.00 35.00 35.75 38.00 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 2,068.00 22.00 21.33 17.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 5,397.00 20.00 27.72 17.00 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 1,596.00 25.00 26.26 20.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 214,359.00 20.35 14.27 10.98 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 11,813.10 28.00 25.87 20.39 BRR500-087 US 160 PAGOSA SPRINGS 07/12/07 22.00 100.00 46.00 44.00 SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 85.00 30.00 47.00 47.00 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 6,818.00 23.00 19.16 22.00 C065A-020 SH65 GRAND MESA SLIDE REPAIR 07/26/07 628.00 30.00 36.67 35.00 NH 5502-055 COALBANK PASS 08/09/07 12.00 100.00 177.67 333.33 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 332.00 40.00 47.57 55.00 C0701-190 26.5 ROAD/I-70 BRIDGE REPAIR 08/27/07 50.00 35.00 107.83 35.00 C0701-187 I-70 20 ROAD BRIDGE REPAIR 09/06/07 33.00 25.00 109.20 35.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 2,062.00 42.00 36.00 32.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 21,855.10 28.13 25.31 23.29 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 2,041.00 17.00 14.63 13.00 STA 340A-013 SH 340 IN FRUITA 10/25/07 15,899.00 25.00 22.24 20.50 CC 0821-084 SH82 ASPEN 12/20/07 6,203.00 20.00 39.20 26.20 SHE 160A-009 U.S. 160 MP 94.15 - MP 96.63 12/20/07 86.00 50.00 73.41 37.86 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 24,229.00 23.13 26.11 21.39 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 270,314.10 21.35 17.39 13.17 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 151 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-06004 ABC (CL 6) Sq Yard ================================================ NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 17,455.00 5.00 5.75 4.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 17,455.00 5.00 5.75 4.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17,455.00 5.00 5.75 4.50 =============== 304-06007 ABC (CL 6) Cubic Yard ============================================= STA 0961-012 SH 96, OVERLAY IN PUEBLO 01/04/07 123.00 50.00 85.80 175.00 STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 76.00 50.00 42.63 50.00 STA 012A-042 SH 12, S. OF LA VETA 01/18/07 33.00 60.00 96.17 130.00 IM 0703-319 EJMT 24.9 KV SERVICE 01/25/07 70.00 70.00 45.76 22.44 STA 0661-009 ON SH 66 IN WELD COUNTY 02/01/07 85.00 65.00 36.51 34.00 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 732.00 30.00 29.77 27.00 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 211.00 30.00 54.15 43.00 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 417.00 23.00 87.50 58.00 HB 065A-019 SH 65 THRU CEDAREDGE 03/08/07 68.00 60.00 59.83 50.00 STA0091-030 SH 9 BETWEEN FAIRPLAY AND ALM 03/22/07 10.00 30.00 63.06 37.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,825.00 35.41 52.82 49.79 NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 110.00 65.00 97.00 59.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 394.70 35.00 31.67 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 504.70 41.54 49.37 36.32 BR 0253-192 I-25&128TH 08/16/07 2,475.00 20.00 31.67 24.50 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 3,465.00 30.00 40.85 49.00 IM 0703-331 WB I-70 AT M.P. 259.70 AND M. 09/06/07 810.00 30.00 45.46 34.82 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6,750.00 26.33 37.50 38.32 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 360.00 30.00 36.49 18.36 C120A-007 ON SH 120 AT PORTLAND OVER TH 11/29/07 165.00 30.00 67.13 60.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 206.00 30.00 38.34 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 731.00 30.00 41.59 29.63 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,810.70 29.08 42.01 39.70 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 152 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-06008 ABC (CL 6) (Spec) Cubic Yard ============================================= NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 50.00 50.00 83.54 34.00 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 14,046.00 18.00 17.45 1.20 NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 2,232.00 30.00 24.55 24.55 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 50.00 50.00 55.56 24.70 IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 50.00 40.00 54.91 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16,428.00 19.89 18.27 4.74 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16,428.00 19.89 18.27 4.74 =============== 304-06009 ABC (CL 6) (Spec) Ton ==================================================== NH 0402-070 US 40 ROUTT COUNTY 02/08/07 3,416.00 30.00 44.25 28.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,416.00 30.00 44.25 28.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,416.00 30.00 44.25 28.50 =============== 304-07000 ABC (CL 7) Ton ==================================================== IM 0702-269 I 70 IN EAGLE COUNTY 01/11/07 4,936.00 18.00 31.00 32.00 STA 1251-005 SH 125 AND 127 NORTH OF COWDR 02/08/07 2,758.00 26.00 22.80 29.00 HB 065A-019 SH 65 THRU CEDAREDGE 03/08/07 5,550.00 20.00 19.67 19.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 13,244.00 20.50 22.41 25.93 NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 4,377.00 28.00 24.83 23.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4,377.00 28.00 24.83 23.30 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 2,069.00 25.00 24.90 20.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,069.00 25.00 24.90 20.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19,690.00 22.64 23.30 24.76 =============== 304-07005 ABC (CL 7) Cubic Yard ============================================= STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 1,688.00 23.00 26.78 22.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,688.00 23.00 26.78 22.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,688.00 23.00 26.78 22.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 153 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-07009 ABC (CL 7) (Spec) Ton ==================================================== STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 3,845.00 20.00 13.83 1.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,845.00 20.00 13.83 1.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,845.00 20.00 13.83 1.00 =============== 304-09000 ABC (Spec) Cubic Yard ============================================= STA 086A-045 SH 86 - FRANKTOWN TO ELBERT C 02/01/07 1,275.00 18.00 36.10 26.75 NH 0062-023 SH 6, CLEAR CREEK CANYON 02/08/07 91.00 65.00 53.78 57.10 IM0252-388 I-25 LARKSPUR INTERCHANGE NOR 03/08/07 3,250.00 20.00 20.11 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,616.00 20.33 26.15 18.37 STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 330.00 40.03 72.83 58.15 STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 2,129.00 24.59 23.40 17.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,459.00 26.66 37.20 23.30 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 6.00 100.00 175.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 100.00 175.00 100.00 STA 340A-013 SH 340 IN FRUITA 10/25/07 295.00 30.00 122.25 71.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 4,125.00 40.25 37.33 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,420.00 39.57 40.26 46.74 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,501.00 29.12 35.30 30.37 =============== 304-09014 ABC (Spec) Ton ==================================================== HB 0063-021 US 6: RIFLE TO NEW CASTLE 01/04/07 4,250.00 15.00 19.28 17.70 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 154 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-09014 ABC (Spec) Ton ==================================================== STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 2,819.00 19.00 17.47 21.00 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 584.00 25.00 42.33 24.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7,653.00 17.24 19.50 19.40 NH 0405-025 KIT CARSON BRIDGE 04/26/07 39.00 31.73 92.25 140.00 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 133.00 40.00 47.66 60.50 NH 3851-016 US 385 NORTH OF BURLINGTON 05/24/07 600.00 16.87 32.73 9.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 772.00 21.61 40.43 24.65 CR100-126 WEST OF KIT CARSON 08/16/07 213.00 36.02 21.75 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 213.00 36.02 21.75 15.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,638.00 18.09 20.75 19.76 =============== 304-09055 ABC (Blotter) Ton ==================================================== NH 0501-054 US 50 IN GUNNISON COUNTY 01/04/07 40.00 30.00 22.33 15.00 NH 0402-070 US 40 ROUTT COUNTY 02/08/07 15.00 27.00 22.50 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 55.00 29.18 22.37 16.36 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 55.00 29.18 22.37 16.36 =============== 306-00000 Reconditioning Mile =================================================== IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 4.40 15000.00 16500.00 11500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.40 15000.00 16500.00 11500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.40 15000.00 16500.00 11500.00 =============== 306-01000 Reconditioning Sq Yard ================================================ NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 969.00 5.00 3.93 5.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 969.00 5.00 3.93 5.20 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 155 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 306-01000 Reconditioning Sq Yard ================================================ STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 550.00 4.28 14.96 2.10 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 4,259.00 2.00 6.61 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4,809.00 2.26 7.77 5.55 CC 0821-084 SH82 ASPEN 12/20/07 3,564.00 10.00 5.63 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,564.00 10.00 5.63 5.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,342.00 5.50 6.37 5.31 =============== 307-00000 Hydrated Lime Ton ==================================================== STA 086A-045 SH 86 - FRANKTOWN TO ELBERT C 02/01/07 435.00 115.00 147.34 144.70 HB 065A-019 SH 65 THRU CEDAREDGE 03/08/07 431.00 150.00 141.75 130.00 STA0091-030 SH 9 BETWEEN FAIRPLAY AND ALM 03/22/07 196.00 130.00 137.97 135.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,062.00 131.97 143.22 136.99 NH 3851-016 US 385 NORTH OF BURLINGTON 05/24/07 248.00 131.04 149.00 147.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 248.00 131.04 149.00 147.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,310.00 131.80 143.89 138.89 =============== 310-00400 Process Asphalt Mat For Base Course Sq Yard ================================================ NH0341-071 US 34: GARFIELD TO MORNING DR 06/14/07 86,353.00 2.00 3.23 2.50 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 51,126.00 2.75 1.78 1.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 137,479.00 2.28 2.59 1.94 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 137,479.00 2.28 2.59 1.94 =============== 310-00608 Full Depth Reclam. of HMA Pvmt (0-8 in.) Sq Yard ================================================ NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 20,558.00 1.40 2.46 2.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20,558.00 1.40 2.46 2.30 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 156 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 310-00608 Full Depth Reclam. of HMA Pvmt (0-8 in.) Sq Yard ================================================ STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 114,763.00 2.45 2.03 2.45 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 85,565.00 3.00 3.09 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 200,328.00 2.68 2.66 2.68 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 220,886.00 2.57 2.63 2.65 =============== 310-00610 Full Depth Reclam. of HMA Pvmt (8-12 in) Sq Yard ================================================ STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 56,683.00 3.00 3.65 3.00 STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 1,867.00 8.35 2.38 2.65 STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 220,556.00 2.10 2.10 2.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 279,106.00 2.32 2.28 2.25 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 40,185.00 4.00 3.43 2.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 40,185.00 4.00 3.43 2.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 319,291.00 2.54 2.48 2.23 =============== 310-00614 Full Depth Reclam of HMA Pvmt (12-16 in) Sq Yard ================================================ STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 27,034.00 2.25 2.53 2.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 27,034.00 2.25 2.53 2.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 27,034.00 2.25 2.53 2.10 =============== 310-00700 Asphalt Emulsion Full Depth Reclamation Sq Yard ================================================ STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 25,813.00 3.50 4.28 4.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 25,813.00 3.50 4.28 4.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25,813.00 3.50 4.28 4.25 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 157 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-00720 HMA (Patching) (Asph) Ton ==================================================== HB 0063-021 US 6: RIFLE TO NEW CASTLE 01/04/07 40.00 200.00 150.00 145.00 STA 0961-012 SH 96, OVERLAY IN PUEBLO 01/04/07 500.00 150.00 167.59 115.00 STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 250.00 160.00 96.16 100.00 IM 0702-270 I 70 THROUGH GLENWOOD CANYON 01/11/07 20.00 200.00 195.00 160.00 STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 200.00 160.00 96.17 95.00 NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 213.00 150.00 103.20 90.25 BR 109A-018 SH 109 LA JUNTA, SH50, MANZI 01/11/07 45.00 180.00 200.00 175.00 STA 012A-042 SH 12, S. OF LA VETA 01/18/07 500.00 140.00 160.00 90.00 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 250.00 110.00 145.40 125.00 STA 069A-021 SH 69, W. OF WALSENBURG 01/25/07 500.00 140.00 77.53 10.00 NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 100.00 150.00 117.47 100.00 IM 0253-194 ON I-25 IN WELD COUNTY 01/25/07 500.00 110.00 163.33 125.00 NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 150.00 125.00 120.00 120.00 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 100.00 250.00 113.03 100.00 STA 086A-045 SH 86 - FRANKTOWN TO ELBERT C 02/01/07 200.00 115.00 116.60 95.00 STA 1251-005 SH 125 AND 127 NORTH OF COWDR 02/08/07 95.00 200.00 156.33 120.00 NH 0402-070 US 40 ROUTT COUNTY 02/08/07 1,815.00 130.00 147.50 120.00 NH 0062-023 SH 6, CLEAR CREEK CANYON 02/08/07 1,223.00 105.00 116.27 81.50 HB 149A-023 SOUTH FORK TO CREEDE - SHOULD 02/08/07 8.00 200.00 440.00 350.00 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 200.00 100.00 100.98 80.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 300.00 215.00 270.90 259.20 IM0252-388 I-25 LARKSPUR INTERCHANGE NOR 03/08/07 100.00 111.00 138.26 95.00 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 40.00 160.00 151.18 129.00 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 500.00 130.00 111.83 86.00 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 40.00 175.00 206.67 210.00 STA0091-030 SH 9 BETWEEN FAIRPLAY AND ALM 03/22/07 500.00 120.00 113.58 82.40 IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 350.00 110.00 108.95 102.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8,739.00 132.83 129.18 103.78 SHE 165A-011 ALONG SH 165 N/O RYE 04/05/07 466.00 180.00 175.20 153.00 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 170.00 209.93 121.91 100.00 NH 030A-025 SH30 (HAVANA)- PARKER TO FLOR 04/19/07 300.00 125.00 132.56 81.00 NH 0405-025 KIT CARSON BRIDGE 04/26/07 50.00 148.07 387.94 335.00 SHE 0251-175 ALONG I 25 NORTH OF THE CITY 04/26/07 944.00 110.00 119.27 101.60 STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 930.00 156.46 174.60 142.00 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 771.00 100.00 119.63 131.50 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 100.00 115.00 187.66 161.50 STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 20.00 274.39 137.50 158.00 SHE0761-193 I-76: SHERIDAN TO I-25 (M.P. 05/17/07 936.00 90.00 102.09 107.53 IM0703-317 FROM MP 221.30 TO MP 251.30 J 05/17/07 1,436.00 88.10 139.16 90.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 3,000.00 105.00 114.23 110.41 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 100.00 120.00 138.93 106.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 158 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-00720 HMA (Patching) (Asph) Ton ==================================================== NH 3851-016 US 385 NORTH OF BURLINGTON 05/24/07 200.00 124.37 127.33 112.00 SHE 133A-032 SH 133 BETWEEN REDSTONE AND M 05/24/07 475.00 200.00 332.75 315.00 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 20.00 250.00 300.00 400.00 IM 0253-196 I-25: 48TH AVE TO US 36 225: 05/31/07 80.00 180.00 252.50 141.00 STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 100.00 125.00 122.50 90.00 BR 059A-032 ON SH 59 IN SEDGWICK COUNTY 06/07/07 10.00 160.00 244.37 225.00 IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 30.00 137.50 320.00 400.00 NH0341-071 US 34: GARFIELD TO MORNING DR 06/14/07 200.00 100.00 91.67 75.00 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 19.00 150.00 180.25 108.00 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 75.00 125.00 146.67 150.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 200.00 135.00 181.08 165.00 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 274.00 131.94 118.97 93.48 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 132.00 120.00 121.00 115.00 CR600-285 VARIOUS LOCATIONS IN REGION 6 06/28/07 107.00 210.00 209.83 220.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 11,145.00 119.95 140.47 124.71 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 100.00 180.00 246.19 159.48 BRR500-087 US 160 PAGOSA SPRINGS 07/12/07 28.00 500.00 527.00 679.00 NH 5502-055 COALBANK PASS 08/09/07 55.00 250.00 179.59 218.18 BR 0253-192 I-25&128TH 08/16/07 50.00 100.00 187.53 205.00 CR100-126 WEST OF KIT CARSON 08/16/07 500.00 116.58 160.29 112.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 489.00 130.00 163.08 140.50 IM0703-323 GEORGETOWN HILL CHUTE 2 AND 3 08/30/07 20.00 330.00 352.29 529.16 IM 0703-331 WB I-70 AT M.P. 259.70 AND M. 09/06/07 30.00 125.00 185.25 97.15 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 100.00 120.00 274.84 293.00 C R600 - 300 VARIOUS LOCATIONS IN REGION 6 09/27/07 100.00 150.00 189.18 184.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,472.00 142.64 187.96 165.16 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 30.00 150.00 128.67 130.00 SHE0092-019 SH 9 NORTH OF SILVERTHORNE, I 10/18/07 20.00 261.00 285.50 236.25 C 0504-055 PUEBLO COUNTY, US-50C AT SALT 11/01/07 100.00 150.00 181.67 180.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 532.00 188.50 210.06 225.00 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 44.00 150.00 130.85 100.92 SHE 082A-010 SH 82 AND BUFFALO VALLEY ROAD 11/29/07 6.00 130.00 692.75 1521.00 C120A-007 ON SH 120 AT PORTLAND OVER TH 11/29/07 15.00 150.00 275.00 175.00 C0703-338 CLEAR CREEK COUNTY 12/05/07 110.00 200.00 203.00 202.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 245.00 100.00 122.14 100.00 CC 0821-084 SH82 ASPEN 12/20/07 100.00 150.00 325.92 456.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,202.00 163.17 197.35 212.05 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 22,558.00 128.72 143.46 123.90 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 159 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-00721 HMA (Patching) (Asph) Sq Yard ================================================ IM 0703-319 EJMT 24.9 KV SERVICE 01/25/07 200.00 30.00 72.53 80.80 NH 1602-102 WITHIN THE ALAMOSA CITY LIMIT 02/15/07 3.00 150.00 278.00 356.00 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 1,668.00 32.00 38.61 42.50 HB 065A-019 SH 65 THRU CEDAREDGE 03/08/07 52.00 60.00 75.33 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,923.00 32.73 41.65 47.58 NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 302.00 35.00 34.75 16.00 ITSSW00-378 VMS REPLACEMENT IN REGIONS 1, 06/21/07 250.00 100.00 187.55 427.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 552.00 64.44 93.28 202.44 C0701-190 26.5 ROAD/I-70 BRIDGE REPAIR 08/27/07 100.00 50.00 82.33 50.00 ITSSW00-455 VMS REPLACEMENT IN REGIONS 1, 08/30/07 25.00 80.00 151.60 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 125.00 56.00 92.23 90.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,600.00 40.58 50.63 82.50 =============== 403-02000 HMA (Spec) Ton ==================================================== IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 3,000.00 100.00 59.41 73.22 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,000.00 100.00 59.41 73.22 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 184.00 120.00 78.13 76.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 184.00 120.00 78.13 76.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,184.00 101.16 62.04 73.38 =============== 403-05000 HMA (RCI) Ton ==================================================== NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 3,256.00 130.00 138.40 125.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 160 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-05000 HMA (RCI) Ton ==================================================== NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 3,678.00 130.00 127.50 127.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6,934.00 130.00 136.39 126.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,934.00 130.00 136.39 126.33 =============== 403-09210 SMA Ton ==================================================== IM 0702-269 I 70 IN EAGLE COUNTY 01/11/07 35,990.00 60.00 68.50 61.00 IM 0253-194 ON I-25 IN WELD COUNTY 01/25/07 19,050.00 70.00 102.67 82.00 NH 0062-023 SH 6, CLEAR CREEK CANYON 02/08/07 12,645.00 73.00 98.38 94.45 IM0252-388 I-25 LARKSPUR INTERCHANGE NOR 03/08/07 32,622.00 71.00 75.61 74.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 100,307.00 67.12 83.84 73.60 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 34,004.00 70.42 71.71 66.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 34,004.00 70.42 71.71 66.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 134,311.00 67.95 79.76 71.70 =============== 403-09221 SMA (Fibers)(Asph) Ton ==================================================== IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 29,424.00 66.00 69.04 63.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 29,424.00 66.00 69.04 63.20 NH 030A-025 SH30 (HAVANA)- PARKER TO FLOR 04/19/07 8,353.00 66.00 74.03 70.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8,353.00 66.00 74.03 70.00 BR 0253-192 I-25&128TH 08/16/07 1,341.00 85.00 69.74 67.00 IM 0703-331 WB I-70 AT M.P. 259.70 AND M. 09/06/07 535.00 85.00 108.89 79.68 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,876.00 85.00 79.21 70.62 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 161 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-09221 SMA (Fibers)(Asph) Ton ==================================================== BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 485.00 85.00 88.40 71.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 485.00 85.00 88.40 71.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40,138.00 67.12 70.70 65.06 =============== 403-09500 Furnish HMA Ton ==================================================== NH 0402-070 US 40 ROUTT COUNTY 02/08/07 3,367.00 55.00 58.25 56.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,367.00 55.00 58.25 56.50 NH 3851-016 US 385 NORTH OF BURLINGTON 05/24/07 250.00 27.76 96.72 62.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 250.00 27.76 96.72 62.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,617.00 53.12 62.10 56.89 =============== 403-33701 HMA (Gr S) (75) Ton ==================================================== STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 6,214.00 65.00 61.47 58.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6,214.00 65.00 61.47 58.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,214.00 65.00 61.47 58.00 =============== 403-33721 HMA (Gr S) (75) (PG 58-28) Ton ==================================================== BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 551.30 85.00 78.27 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 551.30 85.00 78.27 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 551.30 85.00 78.27 50.00 =============== 403-33731 HMA (Gr S) (75) (PG 58-34) Ton ==================================================== BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 398.20 95.00 75.71 57.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 398.20 95.00 75.71 57.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 398.20 95.00 75.71 57.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 162 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-33741 HMA (Gr S) (75) (PG 64-22) Ton ==================================================== HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 1,128.00 80.95 63.03 63.00 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 3,132.00 57.00 63.19 60.75 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 32,725.00 65.00 54.21 52.34 STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 36,082.00 64.00 64.37 58.50 BR 059A-032 ON SH 59 IN SEDGWICK COUNTY 06/07/07 287.00 75.00 134.90 125.00 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 4,344.00 62.50 66.83 70.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 77,698.00 64.34 61.34 56.95 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 5,721.00 63.00 68.68 66.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5,721.00 63.00 68.68 66.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 83,419.00 64.25 61.85 57.60 =============== 403-33751 HMA (Gr S) (75) (PG 64-28) Ton ==================================================== STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 30,682.00 67.00 69.83 62.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 30,682.00 67.00 69.83 62.50 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 1,776.00 70.00 147.50 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,776.00 70.00 147.50 125.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 32,458.00 67.16 72.72 65.92 =============== 403-33841 HMA (Gr S) (100) (PG 64-22) Ton ==================================================== NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 1,047.00 62.00 71.18 77.40 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 16,256.00 58.00 61.15 55.00 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 100.00 100.00 79.20 53.00 IM0252-388 I-25 LARKSPUR INTERCHANGE NOR 03/08/07 15,738.00 55.00 54.86 53.80 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 854.00 60.00 73.06 63.00 SHE 1151-018 SH 115 - GUMAER AVENUE EAST 03/08/07 76.00 100.00 205.37 162.00 IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 300.00 60.00 72.22 57.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 163 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-33841 HMA (Gr S) (100) (PG 64-22) Ton ==================================================== SHE 0504-050 INTERSECTION OF SH 50B AND SH 03/22/07 1,283.00 72.00 101.77 92.56 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 35,654.00 57.57 62.10 56.91 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 2,252.00 60.00 59.67 64.00 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 438.00 60.00 72.45 70.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 902.40 65.00 67.75 57.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,592.40 61.26 61.86 63.04 BR 0253-192 I-25&128TH 08/16/07 6,788.00 65.00 44.02 43.00 IM 0703-331 WB I-70 AT M.P. 259.70 AND M. 09/06/07 2,535.00 70.00 62.33 57.68 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9,323.00 66.36 48.23 46.99 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 1,185.00 70.00 57.29 50.46 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,185.00 70.00 57.29 50.46 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 49,754.40 59.78 59.37 55.34 =============== 403-33851 HMA (Gr S) (100) (PG 64-28) Ton ==================================================== NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 22,203.00 58.00 66.50 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 22,203.00 58.00 66.50 60.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 22,203.00 58.00 66.50 60.00 =============== 403-33871 HMA (Gr S) (100) (PG 76-28) Ton ==================================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 1,866.00 120.00 65.50 63.49 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,866.00 120.00 65.50 63.49 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,866.00 120.00 65.50 63.49 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 164 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-34641 HMA (Gr SX) (50) (PG 64-22) Ton ==================================================== IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 20,301.00 68.00 80.97 79.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20,301.00 68.00 80.97 79.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20,301.00 68.00 80.97 79.45 =============== 403-34701 HMA (Gr SX) (75) Ton ==================================================== HB 0063-021 US 6: RIFLE TO NEW CASTLE 01/04/07 48,172.00 40.00 42.51 38.75 STA 1251-005 SH 125 AND 127 NORTH OF COWDR 02/08/07 33,516.00 45.00 40.96 46.80 HB 065A-019 SH 65 THRU CEDAREDGE 03/08/07 24,657.00 40.00 47.63 41.25 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 34,828.00 45.00 44.32 44.96 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 141,173.00 42.42 43.37 42.63 NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 34,226.00 40.00 46.44 42.45 STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 2,761.00 63.03 85.72 97.60 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 748.00 130.00 183.05 159.43 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 37,735.00 43.47 54.50 48.80 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 23,041.50 55.00 50.60 43.58 C065A-020 SH65 GRAND MESA SLIDE REPAIR 07/26/07 461.00 150.00 133.33 140.00 C0701-187 I-70 20 ROAD BRIDGE REPAIR 09/06/07 94.00 150.00 178.20 173.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 3,025.00 125.00 122.13 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 26,621.50 64.93 55.84 53.25 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 4,863.00 65.00 54.42 51.00 CC 0821-084 SH82 ASPEN 12/20/07 11,592.00 95.00 117.83 121.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 16,455.00 86.13 95.09 100.31 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 221,984.50 48.54 51.51 49.23 =============== 403-34721 HMA (Gr SX) (75) (PG 58-28) Ton ==================================================== STA 086A-045 SH 86 - FRANKTOWN TO ELBERT C 02/01/07 7,630.00 60.00 64.03 60.75 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 165 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-34721 HMA (Gr SX) (75) (PG 58-28) Ton ==================================================== STA0091-030 SH 9 BETWEEN FAIRPLAY AND ALM 03/22/07 4,011.00 75.00 74.30 61.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11,641.00 65.17 67.57 60.96 IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 5,245.00 90.00 85.00 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,245.00 90.00 85.00 60.00 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 51.00 200.00 286.11 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 51.00 200.00 286.11 300.00 SHE0092-019 SH 9 NORTH OF SILVERTHORNE, I 10/18/07 842.00 68.25 151.52 117.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 842.00 68.25 151.52 117.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17,779.00 73.03 75.22 64.04 =============== 403-34731 HMA (Gr SX) (75) (PG 58-34) Ton ==================================================== NH 1602-102 WITHIN THE ALAMOSA CITY LIMIT 02/15/07 33.00 200.00 162.50 165.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 1,278.00 140.00 185.39 179.43 STA0091-030 SH 9 BETWEEN FAIRPLAY AND ALM 03/22/07 9,585.00 80.00 77.35 68.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10,896.00 87.40 85.45 82.11 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 2,708.00 110.00 117.75 130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,708.00 110.00 117.75 130.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13,604.00 91.90 88.51 91.64 =============== 403-34741 HMA (Gr SX) (75) (PG 64-22) Ton ==================================================== STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 40,723.00 61.00 55.49 53.35 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 166 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-34741 HMA (Gr SX) (75) (PG 64-22) Ton ==================================================== STA 012A-042 SH 12, S. OF LA VETA 01/18/07 32,157.00 62.00 69.77 48.40 STA 069A-021 SH 69, W. OF WALSENBURG 01/25/07 38,449.00 57.00 55.64 51.80 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 12,984.00 62.00 58.32 56.00 NH 0062-023 SH 6, CLEAR CREEK CANYON 02/08/07 344.00 90.00 76.08 55.60 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 89,376.00 58.00 55.64 51.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 214,033.00 59.29 58.08 51.62 STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 16,425.00 52.04 56.80 53.00 NH0341-071 US 34: GARFIELD TO MORNING DR 06/14/07 12,587.00 54.00 58.75 53.00 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 22,464.00 54.56 56.33 52.79 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 51,476.00 53.62 56.91 52.91 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 737.00 75.00 110.81 117.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 737.00 75.00 110.81 117.00 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 699.00 63.00 63.99 63.00 C120A-007 ON SH 120 AT PORTLAND OVER TH 11/29/07 150.00 120.00 195.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 849.00 73.07 73.48 69.54 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 267,095.00 58.28 58.10 52.10 =============== 403-34751 HMA (Gr SX) (75) (PG 64-28) Ton ==================================================== NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 35,037.00 63.00 59.82 52.00 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 18,696.00 64.00 59.53 61.50 STA 086A-045 SH 86 - FRANKTOWN TO ELBERT C 02/01/07 14,550.00 62.00 65.12 63.96 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 68,283.00 63.06 61.03 57.15 STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 15,190.00 62.50 62.35 60.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 167 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-34751 HMA (Gr SX) (75) (PG 64-28) Ton ==================================================== NH0341-071 US 34: GARFIELD TO MORNING DR 06/14/07 15,879.00 57.00 64.17 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 31,069.00 59.69 63.46 57.44 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 1,321.00 68.00 67.24 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,321.00 68.00 67.24 60.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 100,673.00 62.08 61.76 57.28 =============== 403-34801 HMA (Gr SX) (100) Ton ==================================================== IM 0702-269 I 70 IN EAGLE COUNTY 01/11/07 3,968.00 45.00 73.00 72.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,968.00 45.00 73.00 72.00 STA 340A-013 SH 340 IN FRUITA 10/25/07 9,032.00 40.00 62.41 48.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9,032.00 40.00 62.41 48.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13,000.00 41.53 64.32 55.33 =============== 403-34841 HMA (Gr SX) (100) (PG 64-22) Ton ==================================================== STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 75,750.00 66.00 57.76 53.50 BR 109A-018 SH 109 LA JUNTA, SH50, MANZI 01/11/07 662.00 120.00 96.75 95.50 NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 4,804.00 65.00 56.00 56.00 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 40,458.00 60.00 53.66 51.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 121,674.00 64.26 56.24 53.25 NH 0405-025 KIT CARSON BRIDGE 04/26/07 823.00 62.37 148.50 135.00 NH 3851-016 US 385 NORTH OF BURLINGTON 05/24/07 9,562.00 58.90 75.92 65.75 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 3,006.00 69.00 83.44 83.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 13,391.00 61.38 83.40 73.93 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 168 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-34841 HMA (Gr SX) (100) (PG 64-22) Ton ==================================================== SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 48.00 300.00 245.00 245.00 CR100-126 WEST OF KIT CARSON 08/16/07 905.00 92.74 129.06 107.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 953.00 103.18 130.58 113.95 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 136,018.00 64.25 58.41 55.71 =============== 403-34851 HMA (Gr SX) (100) (PG 64-28) Ton ==================================================== NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 14,058.00 68.00 64.00 64.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 14,058.00 68.00 64.00 64.00 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 2,699.00 85.00 89.05 86.00 NH 3851-016 US 385 NORTH OF BURLINGTON 05/24/07 12,420.00 59.74 85.90 74.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 15,119.00 64.25 86.86 76.31 C 0504-055 PUEBLO COUNTY, US-50C AT SALT 11/01/07 1,150.00 75.00 106.67 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,150.00 75.00 106.67 120.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30,327.00 66.40 83.29 72.26 =============== 403-34871 HMA (Gr SX) (100) (PG 76-28) Ton ==================================================== STA 0961-012 SH 96, OVERLAY IN PUEBLO 01/04/07 17,631.00 72.00 82.38 74.50 NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 24,661.00 63.00 58.21 52.60 IM 0253-194 ON I-25 IN WELD COUNTY 01/25/07 59,140.00 59.00 85.17 70.00 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 15,514.00 53.00 56.49 50.55 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 1,127.00 70.00 81.41 78.00 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 4,510.00 70.00 92.38 81.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 122,583.00 61.42 72.92 65.16 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 169 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-34871 HMA (Gr SX) (100) (PG 76-28) Ton ==================================================== HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 258.00 82.02 73.97 74.00 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 6,585.00 62.00 61.89 67.50 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 1,788.80 72.00 72.92 65.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8,631.80 64.67 63.42 67.33 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 8,200.00 80.00 102.30 97.00 C R600 - 300 VARIOUS LOCATIONS IN REGION 6 09/27/07 1,088.00 115.00 95.68 88.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9,288.00 84.10 101.27 95.95 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 921.00 70.00 78.77 59.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 921.00 70.00 78.77 59.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 141,423.80 63.16 73.69 67.28 =============== 403-36400 HMA (Gr SX) (75) Ton ==================================================== STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 19,251.00 40.00 47.17 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 19,251.00 40.00 47.17 45.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19,251.00 40.00 47.17 45.00 =============== 405-00000 Heating and Scarifying Sq Yard ================================================ NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 80,883.00 1.70 4.26 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 80,883.00 1.70 4.26 4.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 80,883.00 1.70 4.26 4.00 =============== 405-00100 Heating and Remixing Treatment Sq Yard ================================================ NH 0402-070 US 40 ROUTT COUNTY 02/08/07 134,699.00 4.50 4.75 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 134,699.00 4.50 4.75 5.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 134,699.00 4.50 4.75 5.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 170 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 406-09500 Cold Bitum Pvmt (Recycle) Sq Yard ================================================ STA 086A-045 SH 86 - FRANKTOWN TO ELBERT C 02/01/07 127,189.00 3.00 4.25 2.90 STA 1251-005 SH 125 AND 127 NORTH OF COWDR 02/08/07 266,021.00 3.00 1.58 0.95 HB 065A-019 SH 65 THRU CEDAREDGE 03/08/07 175,041.00 3.00 1.66 1.45 STA0091-030 SH 9 BETWEEN FAIRPLAY AND ALM 03/22/07 60,235.00 3.80 3.27 2.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 628,486.00 3.08 2.22 1.65 NH 3851-016 US 385 NORTH OF BURLINGTON 05/24/07 82,329.00 2.84 2.63 2.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 82,329.00 2.84 2.63 2.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 710,815.00 3.05 2.25 1.75 =============== 408-01000 Hot Joint-Crack Sealant Ton ==================================================== NH 0402-070 US 40 ROUTT COUNTY 02/08/07 7.00 6000.00 4425.00 4850.00 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 0.10 5000.00 6566.67 5400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7.10 5985.92 4469.93 4857.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.10 5985.92 4469.93 4857.75 =============== 409-01015 CC Matl (Ty I) Sq Yard ================================================ NH 0501-054 US 50 IN GUNNISON COUNTY 01/04/07 309,332.00 0.90 0.85 1.05 NH 0402-070 US 40 ROUTT COUNTY 02/08/07 424,966.00 1.00 1.00 1.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 734,298.00 0.96 0.92 1.02 SHE 165A-011 ALONG SH 165 N/O RYE 04/05/07 3,275.00 3.00 7.83 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,275.00 3.00 7.83 5.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 737,573.00 0.97 0.97 1.04 =============== 409-02030 CC Matl (Type I) Special Sq Yard ================================================ STA0712-015 SH 71: NEBRASKA STATE LINE SO 05/10/07 310,300.00 1.05 1.37 1.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 171 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 409-02030 CC Matl (Type I) Special Sq Yard ================================================ STA0631-009 SH 63 IN WASHINGTON COUNTY 05/10/07 188,320.00 1.07 1.35 1.20 STA0343-029 ON US 34 EAST OF YUMA IN YUMA 05/10/07 169,732.00 1.11 3.12 1.24 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 668,352.00 1.07 1.81 1.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 668,352.00 1.07 1.81 1.35 =============== 409-05010 Thin Bonded Wearing Course (Non-Bitum) Sq Yard ================================================ NH 0405-025 KIT CARSON BRIDGE 04/26/07 1,502.00 75.00 53.63 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,502.00 75.00 53.63 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,502.00 75.00 53.63 50.00 =============== 411-03342 Asph Cem (PG 64-28) Ton ==================================================== HB 0063-021 US 6: RIFLE TO NEW CASTLE 01/04/07 2,032.00 475.00 467.58 459.00 IM 0702-269 I 70 IN EAGLE COUNTY 01/11/07 270.00 475.00 470.00 450.00 HB 065A-019 SH 65 THRU CEDAREDGE 03/08/07 1,528.00 475.00 473.33 435.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,830.00 475.00 470.05 448.79 C0701-187 I-70 20 ROAD BRIDGE REPAIR 09/06/07 6.00 500.00 715.00 800.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 189.00 580.00 587.88 560.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 195.00 577.54 592.73 567.38 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 316.00 522.25 630.44 645.00 CC 0821-084 SH82 ASPEN 12/20/07 342.00 500.00 662.67 561.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 658.00 510.69 644.88 601.34 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,683.00 484.28 502.95 475.16 =============== 411-03345 Asph Cem (PG 76-28) Ton ==================================================== IM 0702-269 I 70 IN EAGLE COUNTY 01/11/07 2,627.00 575.00 515.50 515.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,627.00 575.00 515.50 515.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 172 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 411-03345 Asph Cem (PG 76-28) Ton ==================================================== STA 340A-013 SH 340 IN FRUITA 10/25/07 533.00 525.00 535.00 490.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 533.00 525.00 535.00 490.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,160.00 566.57 521.13 510.78 =============== 411-03352 Asph Cem (PG 58-28) Ton ==================================================== HB 0063-021 US 6: RIFLE TO NEW CASTLE 01/04/07 954.00 450.00 429.33 420.00 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 2,459.00 410.00 420.00 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,413.00 421.18 424.08 405.59 NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 217.00 418.00 416.75 425.00 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 1,241.00 400.00 410.00 395.00 STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 166.00 401.92 437.60 495.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,624.00 402.60 415.31 409.23 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 772.00 418.00 479.32 519.75 C065A-020 SH65 GRAND MESA SLIDE REPAIR 07/26/07 27.00 450.00 530.00 700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 799.00 419.08 479.97 525.84 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 360.00 425.25 493.44 490.00 CC 0821-084 SH82 ASPEN 12/20/07 267.00 450.00 623.33 462.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 627.00 435.79 539.87 478.08 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,463.00 417.67 452.14 428.40 =============== 411-03355 Asph Cem (PG 58-34) Ton ==================================================== STA 1251-005 SH 125 AND 127 NORTH OF COWDR 02/08/07 2,078.00 530.00 449.26 359.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 173 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 411-03355 Asph Cem (PG 58-34) Ton ==================================================== NH 0402-070 US 40 ROUTT COUNTY 02/08/07 209.00 620.00 593.50 632.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,287.00 538.22 453.94 383.95 NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 1,901.00 418.00 519.25 525.00 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 47.00 418.00 894.93 850.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,948.00 418.00 534.83 532.86 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 656.60 518.00 583.86 630.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 656.60 518.00 583.86 630.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,891.60 487.63 504.73 476.28 =============== 411-10216 Emul Asph (CRS-2P) Gallon ================================================= IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 780.00 2.79 7.81 12.62 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 780.00 2.79 7.81 12.62 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 780.00 2.79 7.81 12.62 =============== 411-10253 Emul Asph (CSS-1H) Gallon ================================================= IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 13,360.00 2.50 2.83 3.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 13,360.00 2.50 2.83 3.25 STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 1,057.00 3.10 2.96 3.32 NH 3851-016 US 385 NORTH OF BURLINGTON 05/24/07 12,346.00 1.18 2.02 1.85 IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 2,110.00 3.00 2.25 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 15,513.00 1.56 2.15 2.11 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 7,322.00 2.25 2.99 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 7,322.00 2.25 2.99 3.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 36,195.00 2.05 2.68 2.71 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 174 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 411-10255 Emul Asph (SS) Gallon ================================================= HB 0063-021 US 6: RIFLE TO NEW CASTLE 01/04/07 14,900.00 3.00 2.01 1.00 STA 0961-012 SH 96, OVERLAY IN PUEBLO 01/04/07 1,280.00 2.50 6.38 14.40 STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 39,835.00 1.80 1.94 1.25 IM 0702-269 I 70 IN EAGLE COUNTY 01/11/07 31,372.00 2.50 1.38 1.75 STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 16,826.00 2.70 1.83 1.00 NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 9,150.00 2.00 1.52 2.00 BR 109A-018 SH 109 LA JUNTA, SH50, MANZI 01/11/07 130.00 5.00 6.00 3.00 STA 012A-042 SH 12, S. OF LA VETA 01/18/07 25,307.00 2.50 1.62 3.10 STA 069A-021 SH 69, W. OF WALSENBURG 01/25/07 29,403.00 2.50 1.44 0.10 STA 086A-045 SH 86 - FRANKTOWN TO ELBERT C 02/01/07 52,504.00 3.00 1.40 1.50 STA 1251-005 SH 125 AND 127 NORTH OF COWDR 02/08/07 13,415.00 3.00 2.09 1.25 NH 0402-070 US 40 ROUTT COUNTY 02/08/07 285.00 5.00 6.30 2.60 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 7,051.00 4.00 1.54 1.25 NH 1602-102 WITHIN THE ALAMOSA CITY LIMIT 02/15/07 30.00 10.00 8.25 8.50 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 397.00 15.00 13.57 12.96 IM0252-388 I-25 LARKSPUR INTERCHANGE NOR 03/08/07 15,345.00 2.00 1.94 1.74 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 683.00 2.00 2.89 3.00 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 62,370.00 2.50 1.87 0.85 STA0091-030 SH 9 BETWEEN FAIRPLAY AND ALM 03/22/07 9,054.00 2.00 2.12 1.25 IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 10,566.00 2.00 1.95 1.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 339,903.00 2.53 1.77 1.39 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 791.00 3.62 2.43 2.50 NH 030A-025 SH30 (HAVANA)- PARKER TO FLOR 04/19/07 3,030.00 1.25 1.97 1.60 NH 0405-025 KIT CARSON BRIDGE 04/26/07 93.00 3.83 27.18 30.00 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 3,497.00 2.00 2.78 2.00 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 1,869.00 2.50 1.88 1.50 STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 25,107.00 1.75 1.45 1.15 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 1,703.00 2.50 2.22 2.50 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 1,236.00 4.00 5.00 5.00 STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 40,500.00 1.45 2.03 1.25 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 88.00 2.00 4.78 5.00 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 17,483.00 1.70 1.76 2.35 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 1,021.20 2.00 2.18 1.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 96,418.20 1.69 1.97 1.58 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 9,757.50 3.00 3.04 3.78 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 3,600.00 2.00 2.02 1.45 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 175 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 411-10255 Emul Asph (SS) Gallon ================================================= C065A-020 SH65 GRAND MESA SLIDE REPAIR 07/26/07 200.00 5.00 3.83 4.50 BR 0253-192 I-25&128TH 08/16/07 3,490.00 2.50 2.41 2.35 CR100-126 WEST OF KIT CARSON 08/16/07 337.00 3.26 6.20 4.00 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 37.00 20.00 10.56 10.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 3,011.00 2.50 3.43 5.00 IM 0703-331 WB I-70 AT M.P. 259.70 AND M. 09/06/07 485.00 3.00 3.56 5.98 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 45.00 2.50 18.78 19.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 972.00 4.00 4.63 5.00 C R600 - 300 VARIOUS LOCATIONS IN REGION 6 09/27/07 300.00 2.50 4.14 3.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 22,234.50 2.78 2.98 3.49 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 300.00 4.00 4.63 5.00 STA 340A-013 SH 340 IN FRUITA 10/25/07 3,256.00 2.50 2.30 3.00 C 0504-055 PUEBLO COUNTY, US-50C AT SALT 11/01/07 551.00 4.00 3.00 5.00 C120A-007 ON SH 120 AT PORTLAND OVER TH 11/29/07 60.00 5.00 13.63 1.50 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 316.00 3.00 2.60 2.15 CC 0821-084 SH82 ASPEN 12/20/07 3,630.00 5.00 5.34 6.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8,113.00 3.81 4.15 4.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 466,668.70 2.39 1.92 1.59 =============== 411-10258 Emul Asph (RS-P) Ton ==================================================== NH 0501-054 US 50 IN GUNNISON COUNTY 01/04/07 526.00 600.00 396.52 215.00 NH 0402-070 US 40 ROUTT COUNTY 02/08/07 743.00 500.00 442.00 584.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,269.00 541.45 418.58 431.05 STA0712-015 SH 71: NEBRASKA STATE LINE SO 05/10/07 722.00 390.00 257.50 215.00 STA0631-009 SH 63 IN WASHINGTON COUNTY 05/10/07 438.00 400.00 257.50 300.00 STA0343-029 ON US 34 EAST OF YUMA IN YUMA 05/10/07 396.00 400.00 275.00 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,556.00 395.36 261.95 260.56 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,825.00 460.98 339.66 337.14 =============== 411-10259 Emul Asph (MS-P) Ton ==================================================== NH 0501-054 US 50 IN GUNNISON COUNTY 01/04/07 65.00 420.00 611.33 430.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 176 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 411-10259 Emul Asph (MS-P) Ton ==================================================== NH 0402-070 US 40 ROUTT COUNTY 02/08/07 93.00 800.00 775.00 950.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 158.00 643.67 691.23 736.08 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 158.00 643.67 691.23 736.08 =============== 411-10300 Emul Asph (Prime Coat) Gallon ================================================= NH 0402-070 US 40 ROUTT COUNTY 02/08/07 856.00 10.00 8.63 5.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 856.00 10.00 8.63 5.25 IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 1,945.00 2.75 2.50 3.00 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 1,060.00 2.50 11.57 7.49 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,005.00 2.66 8.45 4.58 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 4,430.00 4.00 4.80 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,430.00 4.00 4.80 7.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,291.00 4.13 6.35 5.94 =============== 411-21020 Liq Asph Matl (MC-70) Gallon ================================================= CC 0821-084 SH82 ASPEN 12/20/07 5,337.00 2.75 6.56 13.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5,337.00 2.75 6.56 13.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,337.00 2.75 6.56 13.20 =============== 411-90010 Asph Rejuvenating Agent Gallon ================================================= NH 0402-070 US 40 ROUTT COUNTY 02/08/07 8,082.00 2.50 2.50 3.00 STA0091-030 SH 9 BETWEEN FAIRPLAY AND ALM 03/22/07 87,720.00 2.25 2.33 2.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 95,802.00 2.27 2.34 2.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 95,802.00 2.27 2.34 2.45 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 177 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 411-90040 Recycling Agent Gallon ================================================= STA 086A-045 SH 86 - FRANKTOWN TO ELBERT C 02/01/07 103,980.00 1.50 2.18 2.20 STA 1251-005 SH 125 AND 127 NORTH OF COWDR 02/08/07 369,247.00 2.15 2.27 1.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 473,227.00 2.01 2.25 1.73 NH 3851-016 US 385 NORTH OF BURLINGTON 05/24/07 59,371.00 1.90 2.58 2.50 STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 77,440.00 1.70 2.23 2.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 136,811.00 1.79 2.32 2.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 610,038.00 1.96 2.26 1.86 =============== 411-90050 Emul Recycling Agent Gallon ================================================= HB 065A-019 SH 65 THRU CEDAREDGE 03/08/07 138,519.00 2.00 2.03 1.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 138,519.00 2.00 2.03 1.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 138,519.00 2.00 2.03 1.75 =============== 412-00000 Furn Conc Pvmt Cubic Yard ============================================= IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 41,241.00 93.00 75.02 83.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 41,241.00 93.00 75.02 83.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 41,241.00 93.00 75.02 83.75 =============== 412-00050 Pl Conc Pvmt Sq Yard ================================================ IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 145,043.00 10.00 9.73 7.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 145,043.00 10.00 9.73 7.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 145,043.00 10.00 9.73 7.40 =============== 412-00600 Conc Pvmt (6 In) Sq Yard ================================================ NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 1,644.00 90.00 75.35 44.55 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 178 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 412-00600 Conc Pvmt (6 In) Sq Yard ================================================ SHE 1151-018 SH 115 - GUMAER AVENUE EAST 03/08/07 96.00 50.00 74.98 48.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,740.00 87.79 75.31 44.75 NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 314.00 55.00 101.00 135.00 NH 030A-025 SH30 (HAVANA)- PARKER TO FLOR 04/19/07 30.00 80.00 63.07 40.95 NH 0405-025 KIT CARSON BRIDGE 04/26/07 76.00 61.84 64.92 65.00 SHE0761-193 I-76: SHERIDAN TO I-25 (M.P. 05/17/07 60.00 130.00 105.11 121.42 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 122.00 41.00 45.31 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 602.00 61.75 83.70 97.83 SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 48.00 60.00 49.00 49.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 48.00 60.00 49.00 49.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 159.00 61.00 66.29 63.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 159.00 61.00 66.29 63.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,549.00 79.45 76.22 58.50 =============== 412-00605 Conc Pvmt (6 In) (Fast Track) Sq Yard ================================================ STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 796.00 45.00 63.50 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 796.00 45.00 63.50 80.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 796.00 45.00 63.50 80.00 =============== 412-00715 Conc Pvmt (7 In) (R) Sq Yard ================================================ STA 0961-012 SH 96, OVERLAY IN PUEBLO 01/04/07 342.00 70.00 116.60 185.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 342.00 70.00 116.60 185.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 342.00 70.00 116.60 185.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 179 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 412-00800 Conc Pvmt (8 In) Sq Yard ================================================ SHE 5502-054 02/22/07 55.00 100.00 251.14 242.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 55.00 100.00 251.14 242.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 989.00 65.00 65.18 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 989.00 65.00 65.18 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,044.00 66.84 79.50 60.11 =============== 412-00805 Conc Pvmt (8 In) (Fast Track) Sq Yard ================================================ IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 3,269.00 75.00 77.50 70.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,269.00 75.00 77.50 70.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,269.00 75.00 77.50 70.00 =============== 412-00850 Conc Pvmt (8-1/2 In) Sq Yard ================================================ NH 030A-025 SH30 (HAVANA)- PARKER TO FLOR 04/19/07 37.00 80.00 81.04 74.50 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 10,297.00 41.00 39.18 29.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10,334.00 41.14 39.40 29.16 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10,334.00 41.14 39.40 29.16 =============== 412-00870 Conc Pvmt (8-1/2 In) (Fast Track) Sq Yard ================================================ NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 191.00 55.00 84.80 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 191.00 55.00 84.80 90.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 191.00 55.00 84.80 90.00 =============== 412-00925 Conc Pvmt (9-1/4 In) Sq Yard ================================================ NH 1601-056 US 160 @ ROOSA AVE 08/23/07 471.00 175.00 183.54 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 471.00 175.00 183.54 140.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 471.00 175.00 183.54 140.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 180 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 412-01000 Conc Pvmt (10 In) Sq Yard ================================================ SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 36.00 85.00 131.43 146.70 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 41,068.00 34.00 36.93 33.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 41,104.00 34.04 37.01 33.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 41,104.00 34.04 37.01 33.10 =============== 412-01015 Conc Pvmt (10 In) (R) Sq Yard ================================================ STA 340A-013 SH 340 IN FRUITA 10/25/07 1,244.00 40.00 147.66 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,244.00 40.00 147.66 140.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,244.00 40.00 147.66 140.00 =============== 412-01025 Conc Pvmt (10-1/4 In) Sq Yard ================================================ HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 21,507.00 36.93 46.54 48.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 21,507.00 36.93 46.54 48.00 CR100-126 WEST OF KIT CARSON 08/16/07 175,556.00 38.54 35.65 32.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 175,556.00 38.54 35.65 32.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 197,063.00 38.36 37.57 33.84 =============== 412-01050 Conc Pvmt (10-1/2 In) Sq Yard ================================================ IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 19,514.00 35.00 38.18 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 19,514.00 35.00 38.18 35.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19,514.00 35.00 38.18 35.00 =============== 412-01100 Conc Pvmt (11 In) Sq Yard ================================================ IM 0702-270 I 70 THROUGH GLENWOOD CANYON 01/11/07 28,482.00 67.50 85.50 77.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 28,482.00 67.50 85.50 77.75 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 181 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 412-01100 Conc Pvmt (11 In) Sq Yard ================================================ STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 41.00 100.00 120.67 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 41.00 100.00 120.67 125.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 28,523.00 67.55 85.55 77.82 =============== 412-01120 Conc Pvmt (11 In) (Fast Track) Sq Yard ================================================ NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 13,430.00 70.00 78.10 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 13,430.00 70.00 78.10 75.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13,430.00 70.00 78.10 75.00 =============== 412-01150 Conc Pvmt (11-1/2 In) Sq Yard ================================================ NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 30,807.00 56.00 61.58 53.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 30,807.00 56.00 61.58 53.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30,807.00 56.00 61.58 53.25 =============== 412-01152 Conc Pvmt (11-1/2 In) (Fast Track) Sq Yard ================================================ NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 1,350.00 100.00 60.17 60.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,350.00 100.00 60.17 60.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,350.00 100.00 60.17 60.25 =============== 412-01200 Conc Pvmt (12 In) Sq Yard ================================================ NH 0405-025 KIT CARSON BRIDGE 04/26/07 29,366.00 42.73 49.98 48.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 5,319.00 45.00 42.80 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 34,685.00 43.08 48.88 46.77 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 182 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 412-01200 Conc Pvmt (12 In) Sq Yard ================================================ CC 0821-084 SH82 ASPEN 12/20/07 848.00 120.00 120.83 87.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 848.00 120.00 120.83 87.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 35,533.00 44.91 51.42 47.73 =============== 412-01220 Conc Pvmt (12 In) (Fast Track) Sq Yard ================================================ NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 691.00 145.00 100.00 85.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 691.00 145.00 100.00 85.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 691.00 145.00 100.00 85.00 =============== 412-01300 Conc Pvmt (13 In) Sq Yard ================================================ IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 232,099.00 36.00 39.22 39.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 232,099.00 36.00 39.22 39.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 232,099.00 36.00 39.22 39.00 =============== 412-14000 Sawing and Sealing Joints Lin Foot =============================================== STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 130.00 9.00 14.98 16.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 130.00 9.00 14.98 16.50 IM 0253-196 I-25: 48TH AVE TO US 36 225: 05/31/07 330,000.00 1.40 1.68 1.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 330,000.00 1.40 1.68 1.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 330,130.00 1.40 1.69 1.51 =============== 412-15000 Routing and Sealing Cracks Lin Foot =============================================== IM 0253-196 I-25: 48TH AVE TO US 36 225: 05/31/07 435.00 6.00 8.54 5.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 435.00 6.00 8.54 5.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 435.00 6.00 8.54 5.60 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 183 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 412-15050 Cross Stitching Each =================================================== IM 0253-196 I-25: 48TH AVE TO US 36 225: 05/31/07 1,320.00 40.00 50.50 38.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,320.00 40.00 50.50 38.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,320.00 40.00 50.50 38.50 =============== 412-18020 Rubbil of Conc Pvmt (Resonant Breaker) Sq Yard ================================================ IM 0253-194 ON I-25 IN WELD COUNTY 01/25/07 66,170.00 2.70 5.12 5.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 66,170.00 2.70 5.12 5.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 66,170.00 2.70 5.12 5.35 =============== 412-18030 Rubbil of Conc Pvmt (Multi-Head Breaker) Sq Yard ================================================ IM 0253-194 ON I-25 IN WELD COUNTY 01/25/07 66,170.00 3.10 4.03 3.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 66,170.00 3.10 4.03 3.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 66,170.00 3.10 4.03 3.85 =============== 412-19000 Hot Conc Joint Sealant Lin Foot =============================================== IM 0253-196 I-25: 48TH AVE TO US 36 225: 05/31/07 2,200.00 32.00 13.96 6.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,200.00 32.00 13.96 6.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,200.00 32.00 13.96 6.75 =============== 420-00000 Geomembrane Sq Yard ================================================ C065A-020 SH65 GRAND MESA SLIDE REPAIR 07/26/07 360.00 15.00 15.00 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 360.00 15.00 15.00 7.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 360.00 15.00 15.00 7.00 =============== 420-00100 Geotextile (Er Cont) (CL A) Sq Yard ================================================ STA 0661-009 ON SH 66 IN WELD COUNTY 02/01/07 1,040.00 2.50 4.71 1.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 184 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 420-00100 Geotextile (Er Cont) (CL A) Sq Yard ================================================ STA 086A-045 SH 86 - FRANKTOWN TO ELBERT C 02/01/07 955.00 3.50 4.23 3.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,995.00 2.98 4.56 2.39 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 385.00 10.00 10.54 28.50 IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 180.00 10.00 3.00 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 565.00 10.00 9.52 20.69 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 45.00 15.00 15.91 35.50 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 200.00 12.00 8.63 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 245.00 12.55 9.96 19.58 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 64.00 5.00 11.59 2.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 80.00 11.50 12.94 9.00 BR 0241-047 US 24, 2 MI S OF GRANITE, CHA 11/15/07 221.00 12.00 5.09 9.10 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 2,606.00 1.50 4.64 3.68 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 200.00 3.00 28.88 8.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,171.00 2.65 6.96 4.46 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,976.00 3.86 6.32 5.92 =============== 420-00101 Geotextile (Er Cont) (CL B) Sq Yard ================================================ SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 34.00 7.00 12.21 5.60 IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 1,350.00 3.00 4.71 5.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,384.00 3.10 5.01 5.21 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 105.00 5.76 7.16 10.00 STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 31.00 19.91 11.57 28.75 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 2,239.00 3.00 4.34 5.47 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 185 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 420-00101 Geotextile (Er Cont) (CL B) Sq Yard ================================================ BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 320.00 85.00 4.32 7.50 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 120.00 6.00 4.07 5.25 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 2,450.00 2.00 4.81 4.76 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,265.00 7.74 4.72 5.49 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 390.20 15.00 4.73 3.07 BR 0253-192 I-25&128TH 08/16/07 89.20 3.30 7.34 13.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 6,050.00 3.50 3.25 4.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6,529.40 4.18 3.48 4.53 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 11.00 6.00 29.72 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 11.00 6.00 29.72 10.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13,189.40 5.49 4.26 4.99 =============== 420-00110 Geotextile (Drain) (CL A) Sq Yard ================================================ IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 10,952.00 4.00 3.66 2.54 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10,952.00 4.00 3.66 2.54 NH 5502-055 COALBANK PASS 08/09/07 10.00 20.00 100.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 20.00 100.00 100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10,962.00 4.01 3.70 2.63 =============== 420-00111 Geotextile (Drain) (CL B) Sq Yard ================================================ STA 0661-009 ON SH 66 IN WELD COUNTY 02/01/07 1,597.00 3.00 1.83 1.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,597.00 3.00 1.83 1.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,597.00 3.00 1.83 1.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 186 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 420-00130 Geotextile (Separator) (CL A) Sq Yard ================================================ NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 80.10 5.00 7.50 6.00 HB 065A-019 SH 65 THRU CEDAREDGE 03/08/07 25.00 10.00 19.00 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 105.10 6.19 10.63 5.76 NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 25.00 10.00 28.00 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 25.00 10.00 28.00 11.00 C 0504-055 PUEBLO COUNTY, US-50C AT SALT 11/01/07 87.00 6.00 10.83 8.00 CC 0821-084 SH82 ASPEN 12/20/07 7,503.00 1.50 3.15 3.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 7,590.00 1.55 3.19 3.95 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,720.10 1.64 3.34 3.99 =============== 420-00131 Geotextile (Separator) (CL B) Sq Yard ================================================ STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 3,000.00 2.00 3.70 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,000.00 2.00 3.70 3.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,000.00 2.00 3.70 3.00 =============== 420-00200 Geotextile (Weed Barrier) Sq Yard ================================================ STA 340A-013 SH 340 IN FRUITA 10/25/07 886.00 12.00 4.06 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 886.00 12.00 4.06 5.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 886.00 12.00 4.06 5.00 =============== 420-00201 Geotextile (Weed Barrier) (Spec) Sq Yard ================================================ SHE 165A-011 ALONG SH 165 N/O RYE 04/05/07 90.00 45.00 49.44 62.15 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 187 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 420-00201 Geotextile (Weed Barrier) (Spec) Sq Yard ================================================ SHE 0251-175 ALONG I 25 NORTH OF THE CITY 04/26/07 90.00 50.00 42.23 23.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 180.00 47.50 45.43 42.73 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 180.00 47.50 45.43 42.73 =============== 420-00500 Geotextile (Paving) Sq Yard ================================================ STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 157.00 15.00 12.35 1.00 STA 069A-021 SH 69, W. OF WALSENBURG 01/25/07 695.00 8.00 8.15 5.00 NH 0062-023 SH 6, CLEAR CREEK CANYON 02/08/07 96.00 15.00 49.82 29.35 IM0252-388 I-25 LARKSPUR INTERCHANGE NOR 03/08/07 1,098.00 1.00 5.30 4.75 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 1,666.00 4.00 3.87 1.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,712.00 4.61 7.71 3.86 NH 3851-016 US 385 NORTH OF BURLINGTON 05/24/07 569.00 5.02 5.02 2.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 569.00 5.02 5.02 2.55 CC 0821-084 SH82 ASPEN 12/20/07 70.00 15.00 26.50 49.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 70.00 15.00 26.50 49.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,351.00 4.83 7.92 4.42 =============== 420-00510 Geotextile (Cr Reduc) (H D) Sq Yard ================================================ IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 16,792.00 7.48 6.47 6.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16,792.00 7.48 6.47 6.42 C R600 - 300 VARIOUS LOCATIONS IN REGION 6 09/27/07 55.00 7.00 28.96 27.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 55.00 7.00 28.96 27.05 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16,847.00 7.48 6.54 6.49 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 188 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 502-00460 Pile Tip Each =================================================== BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 20.00 90.00 104.58 107.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20.00 90.00 104.58 107.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 90.00 104.58 107.50 =============== 502-10836 Steel Pile (HP 8x36) Lin Foot =============================================== STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 172.00 90.00 103.14 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 172.00 90.00 103.14 110.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 172.00 90.00 103.14 110.00 =============== 502-11253 Steel Pile (HP 12x53) Lin Foot =============================================== NH 0405-025 KIT CARSON BRIDGE 04/26/07 1,107.00 36.50 52.07 41.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,107.00 36.50 52.07 41.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,107.00 36.50 52.07 41.00 =============== 502-11274 Steel Pile (HP 12x74) Lin Foot =============================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 1,436.00 60.00 53.35 48.90 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 1,265.00 50.00 63.75 55.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,701.00 55.32 59.27 51.99 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,701.00 55.32 59.27 51.99 =============== 503-00018 Drilled Caisson (18 In) Lin Foot =============================================== NH 1602-102 WITHIN THE ALAMOSA CITY LIMIT 02/15/07 4.00 400.00 190.00 260.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 4.00 160.00 216.71 339.12 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 80.00 170.00 339.83 335.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 88.00 180.00 334.48 331.78 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 189 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 503-00018 Drilled Caisson (18 In) Lin Foot =============================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 276.00 100.00 74.33 79.83 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 4.00 200.00 225.00 200.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 216.00 125.00 80.17 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 496.00 111.69 77.17 107.00 SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 4.00 250.00 125.00 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 250.00 125.00 125.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 588.00 122.86 134.08 140.76 =============== 503-00024 Drilled Caisson (24 In) Lin Foot =============================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 960.00 115.00 95.33 99.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 960.00 115.00 95.33 99.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 960.00 115.00 95.33 99.80 =============== 503-00030 Drilled Caisson (30 In) Lin Foot =============================================== STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 24.00 200.00 178.88 220.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 24.00 200.00 178.88 220.00 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 1,279.00 175.00 185.30 135.50 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 484.00 150.00 143.67 149.69 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,763.00 168.14 176.92 139.40 BR 0253-192 I-25&128TH 08/16/07 500.00 220.00 131.92 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 500.00 220.00 131.92 140.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 190 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 503-00030 Drilled Caisson (30 In) Lin Foot =============================================== BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 284.00 225.00 202.54 160.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 1,951.00 180.00 140.54 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,235.00 185.72 149.54 116.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,522.00 182.73 158.18 128.50 =============== 503-00036 Drilled Caisson (36 In) Lin Foot =============================================== SHE 0931-027 SH 93 @ SH 72 01/25/07 57.00 80.00 251.16 190.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 551.00 215.00 358.79 339.12 STA402A-007 SH 402 & I-25 OFFRAMS AND E. 03/22/07 85.00 230.00 174.13 157.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 693.00 205.74 317.76 304.52 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 114.00 165.00 263.28 260.63 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 30.00 300.00 350.00 350.00 CR400-216 SIGNALS @ US34 & SH37, KERSEY 05/24/07 60.00 170.00 270.00 300.00 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 76.00 200.00 213.93 186.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 57.00 300.00 243.00 330.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 337.00 208.64 252.06 270.50 SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 45.00 260.00 425.10 425.10 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 57.00 250.00 210.23 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 102.00 254.41 239.53 299.31 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 30.00 300.00 256.73 260.00 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 273.00 550.00 390.60 270.00 C120A-007 ON SH 120 AT PORTLAND OVER TH 11/29/07 38.00 220.00 294.08 300.00 STSR400-229 SH 14, SH 93, & SH 157 IN BOU 12/06/07 195.00 280.00 309.75 305.75 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 428.00 225.00 185.92 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 964.00 330.30 273.47 224.82 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,096.00 265.86 280.50 262.14 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 191 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 503-00042 Drilled Caisson (42 In) Lin Foot =============================================== SHE 0931-027 SH 93 @ SH 72 01/25/07 17.00 180.00 318.37 210.00 SHE 1151-020 SH 115 VMS, MP 17 AND MP 41 02/15/07 35.00 350.00 364.46 278.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 52.00 294.42 351.18 256.27 NH 0405-025 KIT CARSON BRIDGE 04/26/07 283.00 238.16 339.36 260.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 888.00 170.00 215.13 229.52 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 294.00 200.00 415.83 415.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,465.00 189.19 291.85 272.63 BR 0253-192 I-25&128TH 08/16/07 18.00 220.00 373.51 280.00 ITSSW00-455 VMS REPLACEMENT IN REGIONS 1, 08/30/07 17.00 650.00 1282.50 850.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 17.00 750.00 1200.63 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 52.00 533.85 827.42 767.12 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 17.00 350.00 371.98 310.00 STA 340A-013 SH 340 IN FRUITA 10/25/07 51.00 480.00 620.59 620.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 34.00 259.75 599.78 790.00 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 228.00 260.00 361.12 390.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 190.00 275.00 234.98 175.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 520.00 289.98 354.08 357.54 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,089.00 225.48 323.96 305.67 =============== 503-00048 Drilled Caisson (48 In) Lin Foot =============================================== SHE 0931-027 SH 93 @ SH 72 01/25/07 21.00 280.00 344.13 265.00 NH 1602-102 WITHIN THE ALAMOSA CITY LIMIT 02/15/07 42.00 500.00 647.50 695.00 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 40.00 250.00 270.38 325.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 103.00 358.06 347.83 463.64 STA 0703-312 I-70 HIDDEN VALLEY AND FALL R 05/17/07 64.00 312.16 735.00 735.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 192 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 503-00048 Drilled Caisson (48 In) Lin Foot =============================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 210.00 275.00 333.41 471.14 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 42.00 300.00 270.00 260.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 21.00 300.00 342.33 410.00 ITSSW00-378 VMS REPLACEMENT IN REGIONS 1, 06/21/07 250.00 750.00 684.82 479.45 CR600-285 VARIOUS LOCATIONS IN REGION 6 06/28/07 187.60 400.00 400.00 450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 774.60 463.68 462.77 477.40 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 21.00 350.00 235.16 225.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 990.00 250.00 527.88 375.00 ITSSW00-455 VMS REPLACEMENT IN REGIONS 1, 08/30/07 291.00 750.00 1240.00 890.00 IM R400-215 I-25 & I-76 VMS INSTALLATION 09/06/07 70.00 650.00 494.00 440.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,372.00 377.99 651.13 485.25 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 236.00 625.00 633.96 450.00 STSR400-229 SH 14, SH 93, & SH 157 IN BOU 12/06/07 21.00 290.00 416.40 396.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 257.00 597.63 618.94 445.59 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,506.60 426.17 562.48 477.87 =============== 503-00054 Drilled Caisson (54 In) Lin Foot =============================================== SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 42.00 350.00 322.95 343.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 42.00 350.00 322.95 343.00 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 42.00 375.00 341.25 340.00 CR600-285 VARIOUS LOCATIONS IN REGION 6 06/28/07 52.90 450.00 460.00 495.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 94.90 416.81 398.93 426.40 BR 0253-192 I-25&128TH 08/16/07 159.00 300.00 293.16 325.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 159.00 300.00 293.16 325.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 193 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 503-00054 Drilled Caisson (54 In) Lin Foot =============================================== STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 42.00 415.75 724.34 800.00 STSR400-229 SH 14, SH 93, & SH 157 IN BOU 12/06/07 21.00 350.00 475.20 448.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 63.00 393.83 665.02 682.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 358.90 353.21 399.61 416.70 =============== 503-00060 Drilled Caisson (60 In) Lin Foot =============================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 434.00 300.00 381.94 349.24 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 434.00 300.00 381.94 349.24 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 316.00 400.00 1023.42 900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 316.00 400.00 1023.42 900.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 750.00 342.13 553.14 581.29 =============== 503-00096 Drilled Caisson (96 In) Lin Foot =============================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 408.00 870.00 1704.02 1250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 408.00 870.00 1704.02 1250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 408.00 870.00 1704.02 1250.00 =============== 503-01060 M pile (6 In) Lin Foot =============================================== HB 149A-023 SOUTH FORK TO CREEDE - SHOULD 02/08/07 520.00 150.00 328.33 350.00 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 740.00 50.00 52.63 45.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,260.00 91.27 166.41 171.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,260.00 91.27 166.41 171.40 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 194 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 503-01120 M Pile (12 In) Lin Foot =============================================== STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 251.00 95.00 135.88 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 251.00 95.00 135.88 120.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 251.00 95.00 135.88 120.00 =============== 504-04230 MSE Wall (Repair) LUMP SUM =============================================== C 0504-055 PUEBLO COUNTY, US-50C AT SALT 11/01/07 1.00 125000.00 219333.33 200000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 125000.00 219333.33 200000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 125000.00 219333.33 200000.00 =============== 504-04410 Block Facing Sq Foot ================================================ STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 3,632.00 15.00 13.31 18.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,632.00 15.00 13.31 18.35 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 2,639.00 17.27 16.83 16.00 NH 0405-025 KIT CARSON BRIDGE 04/26/07 1,154.00 13.98 21.02 20.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 28,377.00 8.00 12.57 9.76 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 11,493.00 12.00 8.52 9.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 43,663.00 9.77 11.61 10.34 C065A-020 SH65 GRAND MESA SLIDE REPAIR 07/26/07 6,800.00 30.00 28.00 35.00 BR 0253-192 I-25&128TH 08/16/07 3,715.00 14.00 10.08 8.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10,515.00 24.35 19.46 25.73 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 9,350.00 15.00 8.07 4.41 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 195 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 504-04410 Block Facing Sq Foot ================================================ BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 2,150.00 17.00 13.88 14.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 717.00 15.00 16.89 6.13 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 12,217.00 15.35 10.14 6.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 70,027.00 13.20 12.42 12.34 =============== 504-04420 Precast Panel Facing Sq Foot ================================================ STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 2,745.00 40.00 52.50 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,745.00 40.00 52.50 60.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 1,720.00 25.00 34.90 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,720.00 25.00 34.90 22.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,465.00 34.22 43.97 45.36 =============== 504-04425 Architectural Precast Concrete Panel Sq Foot ================================================ BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 1,048.00 50.00 109.63 129.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,048.00 50.00 109.63 129.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,048.00 50.00 109.63 129.00 =============== 504-06100 Ground Nailed Wall Sq Foot ================================================ C065A-020 SH65 GRAND MESA SLIDE REPAIR 07/26/07 6,410.00 75.00 93.33 85.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6,410.00 75.00 93.33 85.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,410.00 75.00 93.33 85.00 =============== 504-06320 Ground Nail (20 Foot) Each =================================================== IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 23.00 1200.00 1136.67 1080.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 23.00 1200.00 1136.67 1080.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 23.00 1200.00 1136.67 1080.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 196 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 504-06400 Soil Nail Wall Sq Foot ================================================ BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 446.00 130.00 75.79 56.93 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 446.00 130.00 75.79 56.93 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 446.00 130.00 75.79 56.93 =============== 504-08255 Masonry Landscape Wall (Dry Stack) Sq Foot ================================================ CC 0821-084 SH82 ASPEN 12/20/07 623.00 39.00 58.20 50.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 623.00 39.00 58.20 50.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 623.00 39.00 58.20 50.20 =============== 506-00000 Riprap Cubic Yard ============================================= C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 1,671.00 249.23 76.15 56.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,671.00 249.23 76.15 56.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,671.00 249.23 76.15 56.20 =============== 506-00010 Riprap (Special) Cubic Yard ============================================= IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 1,133.00 80.00 73.38 48.51 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,133.00 80.00 73.38 48.51 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,133.00 80.00 73.38 48.51 =============== 506-00030 Grouted Riprap Cubic Yard ============================================= NH0341-071 US 34: GARFIELD TO MORNING DR 06/14/07 57.00 83.00 191.67 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 57.00 83.00 191.67 100.00 C 0504-055 PUEBLO COUNTY, US-50C AT SALT 11/01/07 58.00 180.00 161.67 150.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 197 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 506-00030 Grouted Riprap Cubic Yard ============================================= BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 224.00 140.00 112.88 70.39 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 282.00 148.23 117.75 86.76 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 339.00 137.26 124.36 88.99 =============== 506-00206 Riprap (6 In) Cubic Yard ============================================= NH 0402-070 US 40 ROUTT COUNTY 02/08/07 9.00 200.00 237.50 175.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9.00 200.00 237.50 175.00 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 68.00 90.00 210.00 125.00 STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 12.00 112.20 122.40 141.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 2,000.00 50.00 41.99 49.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,080.00 51.67 46.72 52.45 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 3.00 200.00 439.17 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 200.00 439.17 250.00 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 280.00 55.00 218.05 90.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 6.00 120.00 213.95 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 286.00 56.36 217.96 88.95 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,378.00 52.98 76.67 57.55 =============== 506-00209 Riprap (9 In) Cubic Yard ============================================= NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 2.00 95.00 310.08 180.00 STA 086A-045 SH 86 - FRANKTOWN TO ELBERT C 02/01/07 478.00 57.00 85.45 105.75 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 36.00 70.00 87.41 65.00 SHE 1151-018 SH 115 - GUMAER AVENUE EAST 03/08/07 3.00 125.00 214.07 112.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 519.00 58.44 87.51 103.25 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 198 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 506-00209 Riprap (9 In) Cubic Yard ============================================= HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 122.00 63.14 80.59 75.00 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 129.00 63.72 86.44 61.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 1,081.00 55.00 47.38 48.50 IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 90.00 100.00 112.50 95.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,422.00 59.34 58.84 54.85 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 15.00 102.00 138.88 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 15.00 102.00 138.88 200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,956.00 59.43 68.73 68.81 =============== 506-00212 Riprap (12 In) Cubic Yard ============================================= STA 0661-009 ON SH 66 IN WELD COUNTY 02/01/07 1,065.00 50.00 56.92 50.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 68.00 170.00 148.43 91.80 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 58.00 120.00 166.00 108.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,191.00 60.26 60.34 55.21 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 104.00 124.56 107.75 100.00 NH 0405-025 KIT CARSON BRIDGE 04/26/07 103.00 99.31 143.20 150.00 STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 30.00 91.19 135.20 92.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 833.00 85.00 42.28 48.13 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 103.00 60.00 91.83 70.50 BR 059A-032 ON SH 59 IN SEDGWICK COUNTY 06/07/07 1.00 150.00 539.38 850.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 99.00 90.00 80.83 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,273.00 87.95 69.61 69.67 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 100.00 90.00 106.68 78.20 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 2,597.00 50.00 51.01 46.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,697.00 51.48 54.99 47.19 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 199 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 506-00212 Riprap (12 In) Cubic Yard ============================================= C R400-217 SIGNALS @ SH66 & CR13 10/04/07 22.00 75.00 110.32 120.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 32.00 98.00 158.93 79.00 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 1,091.00 45.00 51.06 51.39 CC 0821-084 SH82 ASPEN 12/20/07 9.00 350.00 258.83 275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,154.00 49.42 57.56 55.21 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,315.00 60.11 59.50 54.70 =============== 506-00218 Riprap (18 In) Cubic Yard ============================================= STA 0661-009 ON SH 66 IN WELD COUNTY 02/01/07 46.00 68.00 82.97 55.00 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 8.00 100.00 165.69 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 54.00 72.74 90.79 76.48 C065A-020 SH65 GRAND MESA SLIDE REPAIR 07/26/07 10.00 350.00 216.67 100.00 NH 5502-055 COALBANK PASS 08/09/07 6.00 250.00 1033.34 1666.67 BR 0253-192 I-25&128TH 08/16/07 79.60 65.00 106.18 125.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 103.00 85.00 127.38 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 198.60 95.31 133.38 178.10 BR 0241-047 US 24, 2 MI S OF GRANITE, CHA 11/15/07 221.00 75.00 113.35 142.52 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 221.00 75.00 113.35 142.52 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 473.60 83.26 115.14 149.91 =============== 506-00224 Riprap (24 In) Cubic Yard ============================================= IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 4,694.00 50.00 69.65 72.11 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 28.00 100.00 110.47 83.87 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4,722.00 50.30 70.07 72.18 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 200 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 506-00224 Riprap (24 In) Cubic Yard ============================================= HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 8.00 110.00 115.89 85.84 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 110.00 115.89 85.84 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 179.00 70.00 112.43 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 179.00 70.00 112.43 150.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,909.00 51.11 72.48 75.04 =============== 506-00243 Riprap (42 In) (Special) Cubic Yard ============================================= BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 1,197.00 90.00 140.64 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,197.00 90.00 140.64 150.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,197.00 90.00 140.64 150.00 =============== 506-01020 Geogrid Reinforce Sq Yard ================================================ C 0504-055 PUEBLO COUNTY, US-50C AT SALT 11/01/07 1,363.00 8.00 8.50 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,363.00 8.00 8.50 5.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,363.00 8.00 8.50 5.00 =============== 507-00000 Conc S and D Pave Cubic Yard ============================================= NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 20.00 490.00 405.00 380.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 490.00 405.00 380.00 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 15.00 345.72 559.26 800.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 201 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 507-00000 Conc S and D Pave Cubic Yard ============================================= NH 0405-025 KIT CARSON BRIDGE 04/26/07 3.00 460.00 669.81 700.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 186.00 450.00 387.39 276.05 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 45.00 400.00 453.53 211.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 249.00 434.80 423.33 300.97 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 30.00 300.00 435.39 325.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 30.00 300.00 435.39 325.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 299.00 424.97 423.56 308.66 =============== 507-00100 Conc S and D Pave (Reinf) Cubic Yard ============================================= BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 182.00 354.60 430.02 317.50 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 829.00 500.00 312.37 291.99 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 3.90 964.12 935.05 736.27 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,014.90 475.71 344.13 298.27 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 23.50 750.00 661.83 276.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 23.50 750.00 661.83 276.00 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 18.00 350.00 535.11 550.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 49.00 500.00 448.97 330.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 67.00 459.70 472.11 389.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,105.40 480.57 360.65 303.30 =============== 507-00105 Conc S and D Pave (Reinf)(C) Cubic Yard ============================================= BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 170.00 750.00 557.91 274.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 170.00 750.00 557.91 274.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 170.00 750.00 557.91 274.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 202 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 507-00200 Dry Rubble S and D Pave Cubic Yard ============================================= BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 6.00 150.00 214.58 375.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 150.00 214.58 375.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 150.00 214.58 375.00 =============== 507-00400 Bitum S and D Pave (Asph) Ton ==================================================== STA 086A-045 SH 86 - FRANKTOWN TO ELBERT C 02/01/07 3.00 350.00 442.35 347.75 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 2.00 200.00 513.00 720.00 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 24.00 225.00 253.33 180.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 29.00 236.21 313.45 234.59 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 2.00 395.00 432.44 420.00 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 10.00 191.43 261.56 252.50 STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 1.00 692.00 535.00 870.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 13.00 261.25 300.23 325.77 BR 0253-192 I-25&128TH 08/16/07 4.00 300.00 240.16 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 300.00 240.16 400.00 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 86.00 130.00 222.50 180.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 13.00 245.25 233.93 235.00 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 15.00 250.00 182.60 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 114.00 158.93 218.03 175.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 160.00 184.78 240.05 204.21 =============== 507-00550 Concrete Lined Ditch Lin Foot =============================================== STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 324.00 39.00 73.75 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 324.00 39.00 73.75 40.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 324.00 39.00 73.75 40.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 203 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 507-00700 S and D Pave (Spec) Cubic Yard ============================================= IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 1,312.50 499.24 287.06 328.44 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,312.50 499.24 287.06 328.44 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,312.50 499.24 287.06 328.44 =============== 508-00000 Untr Timber M Ft Bd Measure ======================================== C120A-007 ON SH 120 AT PORTLAND OVER TH 11/29/07 0.25 5000.00 14300.00 15000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 0.25 5000.00 14300.00 15000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 0.25 5000.00 14300.00 15000.00 =============== 509-00000 Str Steel Pound ================================================== BR 109A-018 SH 109 LA JUNTA, SH50, MANZI 01/11/07 1,731.00 15.00 25.63 16.25 HB 149A-023 SOUTH FORK TO CREEDE - SHOULD 02/08/07 4,416.00 5.00 6.20 1.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6,147.00 7.82 10.22 5.83 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 1,372,310.00 1.20 1.16 0.85 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 1,280.00 6.00 7.97 2.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,373,590.00 1.20 1.16 0.85 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 222,770.00 2.00 2.00 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 222,770.00 2.00 2.00 2.00 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 3,357.00 2.10 5.34 0.50 C120A-007 ON SH 120 AT PORTLAND OVER TH 11/29/07 75.00 3.00 37.75 65.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 132,296.00 4.00 6.23 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 135,728.00 3.95 6.22 5.90 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,738,235.00 1.54 1.67 1.41 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 204 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 509-00001 Str Steel (Galv) Pound ================================================== STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 2,260.00 4.20 4.55 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,260.00 4.20 4.55 6.00 STA 340A-013 SH 340 IN FRUITA 10/25/07 1,840.00 4.50 5.29 6.50 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 5,376.00 2.60 3.33 3.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 10,316.00 4.50 3.39 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 17,532.00 3.92 3.50 3.37 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19,792.00 3.95 3.58 3.67 =============== 509-08100 Provide Temporary Support LUMP SUM =============================================== BR 109A-018 SH 109 LA JUNTA, SH50, MANZI 01/11/07 1.00 65000.00 58850.88 43701.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 65000.00 58850.88 43701.75 C0701-190 26.5 ROAD/I-70 BRIDGE REPAIR 08/27/07 1.00 79500.00 74416.67 79500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 79500.00 74416.67 79500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 72250.00 68190.35 61600.88 =============== 509-90002 Paint Existing Structure (Special) Gallon ================================================= BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 20.00 324.09 356.97 200.00 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 420.00 200.00 207.67 353.00 BR 059A-032 ON SH 59 IN SEDGWICK COUNTY 06/07/07 10.00 1000.00 494.50 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 450.00 223.29 222.69 349.47 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 100.00 350.00 175.48 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 100.00 350.00 175.48 80.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 550.00 246.33 214.16 300.47 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 205 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 509-90003 Paint Structural Steel LUMP SUM =============================================== STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 1.00 7000.00 13458.38 9000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 7000.00 13458.38 9000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 7000.00 13458.38 9000.00 =============== 510-10079 Str PAP (5-10x6-6) Lin Foot =============================================== STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 108.00 350.00 510.83 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 108.00 350.00 510.83 500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 108.00 350.00 510.83 500.00 =============== 510-10087 Str PAP (5-10x7-7) Lin Foot =============================================== STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 36.00 375.00 553.00 550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 36.00 375.00 553.00 550.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 36.00 375.00 553.00 550.00 =============== 512-00101 Bearing Device (Type I) Each =================================================== BR 109A-018 SH 109 LA JUNTA, SH50, MANZI 01/11/07 67.00 350.00 301.88 298.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 67.00 350.00 301.88 298.75 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 16.00 800.00 947.71 997.84 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 14.00 800.00 2596.33 2528.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 30.00 800.00 1883.42 1711.91 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 8.00 2000.00 1168.12 800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8.00 2000.00 1168.12 800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 105.00 604.29 1137.17 740.70 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 206 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 512-00103 Bearing Device (Type III) Each =================================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 8.00 10000.00 7610.13 8878.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 10000.00 7610.13 8878.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 10000.00 7610.13 8878.50 =============== 513-00600 Bridge Drain Each =================================================== IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 3.00 5000.00 5666.67 6000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 5000.00 5666.67 6000.00 C0701-187 I-70 20 ROAD BRIDGE REPAIR 09/06/07 4.00 1300.00 1632.40 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 1300.00 1632.40 2000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 2885.71 2884.41 3714.29 =============== 513-00690 Bridge Drain (Spec) Each =================================================== NH 0405-025 KIT CARSON BRIDGE 04/26/07 2.00 3777.95 3273.16 3500.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 4.00 5500.00 6741.93 7982.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 4925.98 5585.67 6488.47 BR 0253-192 I-25&128TH 08/16/07 4.00 7000.00 6868.01 8000.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 2.00 4000.00 7328.60 7687.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 6000.00 6944.77 7895.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 5462.99 6265.22 7192.07 =============== 514-00000 Pipe Railing Lin Foot =============================================== BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 95.00 50.00 113.94 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 95.00 50.00 113.94 100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 95.00 50.00 113.94 100.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 207 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 514-00100 Hand Rail Lin Foot =============================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 75.00 70.00 134.70 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 75.00 70.00 134.70 110.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 75.00 70.00 134.70 110.00 =============== 514-00201 Ped Railing (Steel) (Spec) Lin Foot =============================================== BR 0253-192 I-25&128TH 08/16/07 621.00 250.00 271.23 265.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 2,582.00 200.00 263.67 284.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,203.00 209.69 266.51 280.72 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 128.00 140.00 283.27 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 128.00 140.00 283.27 250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,331.00 207.02 267.93 279.54 =============== 514-01011 Bridge Rail (Steel) Lin Foot =============================================== BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 558.00 225.00 296.74 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 558.00 225.00 296.74 250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 558.00 225.00 296.74 250.00 =============== 515-00120 Waterproofing (Membrane) Sq Yard ================================================ STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 2,814.00 11.00 9.58 10.00 BR 109A-018 SH 109 LA JUNTA, SH50, MANZI 01/11/07 835.00 16.00 12.25 11.50 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 3,550.00 9.00 9.50 9.00 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 2,261.00 11.00 17.32 17.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9,460.00 10.69 11.88 11.43 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 2,456.00 8.00 11.69 10.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 208 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 515-00120 Waterproofing (Membrane) Sq Yard ================================================ IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 11,481.00 9.50 8.75 8.49 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 2,802.00 9.00 9.53 10.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16,739.00 9.20 9.48 9.05 BR 0253-192 I-25&128TH 08/16/07 1,794.00 12.00 10.30 9.50 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 10,595.00 10.00 12.20 10.50 C0701-187 I-70 20 ROAD BRIDGE REPAIR 09/06/07 605.00 15.00 17.75 14.75 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 1,196.00 8.00 13.00 10.00 C R600 - 300 VARIOUS LOCATIONS IN REGION 6 09/27/07 3,640.00 9.00 13.11 8.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 17,830.00 10.03 12.56 10.05 STA 340A-013 SH 340 IN FRUITA 10/25/07 100.00 10.00 46.88 55.00 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 1,818.00 12.00 10.59 9.17 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 1,061.00 10.00 12.61 9.50 C0703-338 CLEAR CREEK COUNTY 12/05/07 35.00 30.00 36.67 28.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 1,318.00 12.00 10.69 9.51 CC 0821-084 SH82 ASPEN 12/20/07 514.00 45.00 23.88 27.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,846.00 15.15 12.94 12.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 48,875.00 10.38 11.33 10.20 =============== 515-00122 Waterproofing (Membrane)(Spec) Sq Yard ================================================ IM 0253-194 ON I-25 IN WELD COUNTY 01/25/07 792.00 16.00 88.67 86.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 792.00 16.00 88.67 86.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 792.00 16.00 88.67 86.00 =============== 515-00400 Concrete Sealer Sq Yard ================================================ BR 109A-018 SH 109 LA JUNTA, SH50, MANZI 01/11/07 1,960.00 7.50 7.38 5.75 IM 0253-194 ON I-25 IN WELD COUNTY 01/25/07 73.00 7.50 12.67 11.00 IM0252-388 I-25 LARKSPUR INTERCHANGE NOR 03/08/07 29.00 5.00 55.14 104.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,062.00 7.46 8.95 7.32 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 209 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 515-00400 Concrete Sealer Sq Yard ================================================ BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 1,359.00 5.50 7.49 7.00 STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 644.00 6.30 7.98 7.70 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 542.00 8.00 8.30 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,545.00 6.23 7.69 6.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,607.00 6.79 8.03 7.01 =============== 515-00410 Concrete Sealer (Calcium Nitrite) Sq Yard ================================================ IM0252-388 I-25 LARKSPUR INTERCHANGE NOR 03/08/07 29.00 55.00 114.58 109.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 29.00 55.00 114.58 109.50 NH 0405-025 KIT CARSON BRIDGE 04/26/07 1,893.00 40.53 38.15 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,893.00 40.53 38.15 40.00 C0703-338 CLEAR CREEK COUNTY 12/05/07 35.00 100.00 66.33 108.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 35.00 100.00 66.33 108.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,957.00 41.81 39.67 42.25 =============== 518-00000 Brdg Compress Joint Sealer Lin Foot =============================================== BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 40.00 150.00 236.81 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 40.00 150.00 236.81 250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 150.00 236.81 250.00 =============== 518-01002 Br Expan Device (0-2 In) Lin Foot =============================================== STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 199.00 140.00 130.80 125.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 210 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 518-01002 Br Expan Device (0-2 In) Lin Foot =============================================== BR 109A-018 SH 109 LA JUNTA, SH50, MANZI 01/11/07 420.00 110.00 111.13 124.25 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 707.00 125.00 135.00 120.00 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 234.00 140.00 124.00 120.00 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 159.20 150.00 225.00 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,719.20 127.43 135.46 124.40 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 103.00 130.00 126.55 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 103.00 130.00 126.55 120.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,822.20 127.57 134.76 124.15 =============== 518-01004 Br Expan Device (0-4 In) Lin Foot =============================================== BR 109A-018 SH 109 LA JUNTA, SH50, MANZI 01/11/07 107.50 125.00 189.75 233.50 IM0252-388 I-25 LARKSPUR INTERCHANGE NOR 03/08/07 87.00 200.00 657.39 202.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 194.50 158.55 478.80 219.68 NH 0405-025 KIT CARSON BRIDGE 04/26/07 106.00 179.20 184.38 150.00 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 156.00 180.00 169.62 213.50 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 752.00 140.00 165.17 164.66 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 294.00 180.00 174.08 204.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,308.00 156.94 169.74 178.25 BR 0253-192 I-25&128TH 08/16/07 155.00 200.00 248.24 225.00 C0701-187 I-70 20 ROAD BRIDGE REPAIR 09/06/07 50.00 280.00 274.60 156.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 54.00 200.00 303.50 160.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 259.00 215.44 263.17 198.13 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 104.00 200.00 184.36 189.51 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 104.00 200.00 184.36 189.51 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,865.50 167.63 204.43 185.96 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 211 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 518-01009 Br Expan Device (0-9 In) Lin Foot =============================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 206.00 1000.00 1122.20 1203.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 206.00 1000.00 1122.20 1203.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 206.00 1000.00 1122.20 1203.50 =============== 518-02100 Polymer Mortar End Dam Cubic Foot ============================================= IM 0702-269 I 70 IN EAGLE COUNTY 01/11/07 259.00 450.00 440.50 381.00 IM 0702-270 I 70 THROUGH GLENWOOD CANYON 01/11/07 43.00 500.00 649.17 620.00 BR 109A-018 SH 109 LA JUNTA, SH50, MANZI 01/11/07 32.00 550.00 645.50 641.00 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 23.00 400.00 536.83 550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 357.00 461.76 503.32 443.98 STA 340A-013 SH 340 IN FRUITA 10/25/07 4.00 475.00 396.25 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 475.00 396.25 55.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 361.00 461.91 501.34 439.67 =============== 518-03000 Saw and Seal Br Joint Lin Foot =============================================== STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 228.00 20.00 21.27 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 228.00 20.00 21.27 14.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 228.00 20.00 21.27 14.00 =============== 518-03100 Rapid Cure Silicone Jt Seal Lin Foot =============================================== IM 0702-269 I 70 IN EAGLE COUNTY 01/11/07 447.00 40.00 43.00 41.00 IM 0702-270 I 70 THROUGH GLENWOOD CANYON 01/11/07 256.00 50.00 52.47 52.00 BR 109A-018 SH 109 LA JUNTA, SH50, MANZI 01/11/07 126.00 60.00 60.13 45.25 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 76.00 40.00 59.00 56.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 905.00 45.61 50.97 45.96 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 212 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 518-03100 Rapid Cure Silicone Jt Seal Lin Foot =============================================== STA 340A-013 SH 340 IN FRUITA 10/25/07 16.00 30.00 86.50 128.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 16.00 30.00 86.50 128.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 921.00 45.34 51.90 47.39 =============== 519-03000 Thin Bonded Epoxy Overlay Sq Yard ================================================ C R600 - 300 VARIOUS LOCATIONS IN REGION 6 09/27/07 740.00 60.00 48.40 42.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 740.00 60.00 48.40 42.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 740.00 60.00 48.40 42.00 =============== 601-01000 Conc CL B Cubic Yard ============================================= STA 012A-042 SH 12, S. OF LA VETA 01/18/07 19.20 650.00 1028.33 1910.00 HB 149A-023 SOUTH FORK TO CREEDE - SHOULD 02/08/07 25.00 2000.00 2116.00 1600.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 30.00 1100.00 1106.55 626.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 74.20 1286.79 1344.59 1286.58 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 38.40 476.39 565.13 650.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 139.00 450.00 598.49 399.45 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 28.00 600.00 276.75 217.50 IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 2.00 750.00 2150.00 1300.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 2.00 500.00 1013.33 750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 209.40 478.24 537.05 433.02 BRR500-087 US 160 PAGOSA SPRINGS 07/12/07 2.40 2000.00 2120.50 1241.00 SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 2.00 265.00 165.00 165.00 NH 5502-055 COALBANK PASS 08/09/07 1.00 1500.00 1000.00 1000.00 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 4.00 1000.00 1419.17 1500.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 213 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-01000 Conc CL B Cubic Yard ============================================= STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 48.00 1000.00 1111.50 930.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 57.40 1024.91 1136.35 957.29 BR R300-130 I-70 (VARIOUS LOCATIONS) 10/18/07 84.50 900.00 751.67 535.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 84.50 900.00 751.67 535.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 425.50 776.74 765.89 672.84 =============== 601-01025 Conc CL B (Misc) Cubic Yard ============================================= IM 0703-319 EJMT 24.9 KV SERVICE 01/25/07 65.00 300.00 176.63 80.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 65.00 300.00 176.63 80.80 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 2.00 606.67 815.66 2100.00 SHE 0251-175 ALONG I 25 NORTH OF THE CITY 04/26/07 8.00 500.00 1835.85 2205.00 STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 6.90 1257.69 970.00 975.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16.90 821.98 1336.93 1690.38 C0702-273 I-70 GLENWOOD CANYON 08/09/07 240.00 350.00 300.00 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 240.00 350.00 300.00 300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 321.90 364.68 429.34 328.73 =============== 601-01040 Conc CL B (Bridge) Cubic Yard ============================================= C0701-190 26.5 ROAD/I-70 BRIDGE REPAIR 08/27/07 11.00 690.00 1080.00 690.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 11.00 690.00 1080.00 690.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 690.00 1080.00 690.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 214 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-01050 Conc CL B (Wall) Cubic Yard ============================================= IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 109.00 300.00 274.75 232.49 STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 56.70 475.00 908.33 900.00 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 21.30 464.00 532.83 413.27 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 187.00 371.74 550.07 455.48 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 10.00 500.00 1252.97 460.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 500.00 1252.97 460.00 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 9.00 450.00 282.46 710.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9.00 450.00 282.46 710.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 206.00 381.39 571.05 466.82 =============== 601-03000 Conc CL D Cubic Yard ============================================= IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 25.00 800.00 991.67 975.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 25.00 800.00 991.67 975.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 25.00 400.00 691.49 399.45 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 24.00 600.00 899.00 625.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 49.00 497.96 778.35 509.92 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 15.00 450.00 1392.21 1230.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 15.00 450.00 1392.21 1230.00 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 19.60 500.00 347.50 200.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 215 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-03000 Conc CL D Cubic Yard ============================================= BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 5.00 450.00 758.76 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 24.60 489.84 461.32 240.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 113.60 556.34 801.47 649.04 =============== 601-03020 Conc CL D (Misc) Cubic Yard ============================================= SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 7.00 500.00 544.07 375.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7.00 500.00 544.07 375.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 500.00 544.07 375.00 =============== 601-03027 Conc CL D (Spec) Cubic Yard ============================================= STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 3.00 800.00 3965.00 4665.00 BR 109A-018 SH 109 LA JUNTA, SH50, MANZI 01/11/07 2.00 1500.00 2450.00 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 1080.00 3646.05 3599.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 1080.00 3646.05 3599.00 =============== 601-03030 Conc CL D (Box) Cubic Yard ============================================= NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 39.00 400.00 646.00 550.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 16.00 1200.00 957.82 583.20 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 45.00 480.00 560.61 600.00 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 26.00 750.00 927.83 925.00 SHE 0504-050 INTERSECTION OF SH 50B AND SH 03/22/07 11.00 650.00 1150.00 1050.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 137.00 606.20 704.77 681.61 NH 0405-025 KIT CARSON BRIDGE 04/26/07 71.00 709.10 651.89 1000.00 STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 63.20 550.00 747.67 725.00 BR 059A-032 ON SH 59 IN SEDGWICK COUNTY 06/07/07 29.40 550.00 1098.55 800.00 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 390.00 550.00 524.38 454.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 553.60 570.40 594.91 573.87 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 216 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-03030 Conc CL D (Box) Cubic Yard ============================================= HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 40.10 800.00 1246.79 1114.30 CR100-126 WEST OF KIT CARSON 08/16/07 113.00 590.45 659.39 585.00 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 1,593.00 400.00 442.75 251.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,746.10 421.51 506.84 292.44 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,436.70 465.72 556.44 378.26 =============== 601-03040 Conc CL D (Bridge) Cubic Yard ============================================= BR 109A-018 SH 109 LA JUNTA, SH50, MANZI 01/11/07 235.00 600.00 636.00 638.00 NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 10.20 450.00 445.00 445.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 245.20 593.76 631.94 629.97 NH 0405-025 KIT CARSON BRIDGE 04/26/07 1,016.00 399.31 559.34 755.00 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 1,015.00 470.00 523.73 480.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 5,241.00 325.00 396.14 429.07 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 1,019.00 420.00 414.00 269.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8,291.00 363.53 437.76 455.57 BR 0253-192 I-25&128TH 08/16/07 1,234.00 400.00 322.19 350.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 2,180.30 450.00 451.62 429.00 C0701-187 I-70 20 ROAD BRIDGE REPAIR 09/06/07 156.00 600.00 1032.40 680.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 816.00 750.00 862.38 610.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,386.30 497.08 519.90 449.37 STA 340A-013 SH 340 IN FRUITA 10/25/07 12.00 385.00 988.75 800.00 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 686.00 445.00 400.43 375.00 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 494.00 485.00 573.89 640.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 780.00 400.00 482.20 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,972.00 436.86 474.47 453.86 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14,894.50 416.36 464.76 456.39 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 217 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-03041 Conc CL D (Bridge) (Spec) Cubic Yard ============================================= NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 101.00 500.00 397.00 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 101.00 500.00 397.00 300.00 C R600 - 300 VARIOUS LOCATIONS IN REGION 6 09/27/07 293.00 600.00 544.40 489.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 293.00 600.00 544.40 489.00 C0703-338 CLEAR CREEK COUNTY 12/05/07 6.30 1000.00 1831.67 525.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.30 1000.00 1831.67 525.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 400.30 581.06 519.21 441.88 =============== 601-03050 Conc CL D (Wall) Cubic Yard ============================================= STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 37.00 700.00 606.00 600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 37.00 700.00 606.00 600.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 87.00 450.00 493.33 450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 87.00 450.00 493.33 450.00 STA 340A-013 SH 340 IN FRUITA 10/25/07 91.00 500.00 1142.81 1235.00 BR 0241-047 US 24, 2 MI S OF GRANITE, CHA 11/15/07 35.00 800.00 1098.48 980.97 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 10.00 600.00 827.83 600.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 129.00 400.00 598.59 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 265.00 494.72 836.57 819.69 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 389.00 504.24 768.19 716.12 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 218 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-03540 Conc CL DT (Deck Topping) Cubic Yard ============================================= IM 0702-270 I 70 THROUGH GLENWOOD CANYON 01/11/07 65.00 600.00 857.00 530.00 BR 109A-018 SH 109 LA JUNTA, SH50, MANZI 01/11/07 201.00 380.00 401.88 385.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 266.00 433.76 550.53 421.00 STA 340A-013 SH 340 IN FRUITA 10/25/07 0.30 425.00 2752.50 3000.00 C120A-007 ON SH 120 AT PORTLAND OVER TH 11/29/07 1.00 1000.00 4700.00 3500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.30 867.31 4250.58 3384.62 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 267.30 435.87 582.48 435.41 =============== 601-04000 Conc CL E Cubic Yard ============================================= IM 0253-194 ON I-25 IN WELD COUNTY 01/25/07 1.00 800.00 4166.67 3500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 800.00 4166.67 3500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 800.00 4166.67 3500.00 =============== 601-05010 Conc CL H (Sp) Cubic Yard ============================================= STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 51.00 1192.50 831.85 803.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 51.00 1192.50 831.85 803.70 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 51.00 1192.50 831.85 803.70 =============== 601-05045 Conc CL S40 Cubic Yard ============================================= BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 9,361.40 850.00 687.14 713.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9,361.40 850.00 687.14 713.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,361.40 850.00 687.14 713.50 =============== 601-05050 Conc CL S50 Cubic Yard ============================================= IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 126.00 500.00 847.72 758.36 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 126.00 500.00 847.72 758.36 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 126.00 500.00 847.72 758.36 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 219 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-05540 Conc CL HT (Deck Topping) Cubic Yard ============================================= IM 0702-270 I 70 THROUGH GLENWOOD CANYON 01/11/07 295.00 840.00 696.67 720.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 295.00 840.00 696.67 720.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 437.00 600.00 274.24 248.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 437.00 600.00 274.24 248.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 732.00 696.72 486.77 438.52 =============== 601-06020 Conc (Patching) (Polymer) Cubic Yard ============================================= BR 109A-018 SH 109 LA JUNTA, SH50, MANZI 01/11/07 8.70 4500.00 5148.75 6047.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.70 4500.00 5148.75 6047.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.70 4500.00 5148.75 6047.50 =============== 601-06100 Conc (Patching) Cubic Yard ============================================= SHE 1151-020 SH 115 VMS, MP 17 AND MP 41 02/15/07 27.00 900.00 683.52 444.13 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 5.00 1875.00 4670.00 4000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 32.00 1052.34 1306.41 999.73 C 0504-055 PUEBLO COUNTY, US-50C AT SALT 11/01/07 3.00 3000.00 1046.67 740.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 3000.00 1046.67 740.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 35.00 1219.29 1294.78 977.47 =============== 601-06150 Conc (Patching) Sq Foot ================================================ STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 72.00 100.00 77.52 87.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 220 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-06150 Conc (Patching) Sq Foot ================================================ IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 12.00 250.00 494.00 482.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 84.00 121.43 109.55 143.43 IM 0253-196 I-25: 48TH AVE TO US 36 225: 05/31/07 800.00 45.00 256.25 179.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 800.00 45.00 256.25 179.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 884.00 52.26 237.53 175.62 =============== 601-06400 Grout (Bridge)(Spec) Cubic Foot ============================================= BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 13.50 250.00 844.87 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 13.50 250.00 844.87 200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13.50 250.00 844.87 200.00 =============== 601-10200 Mud Jacking Hour =================================================== C0703-338 CLEAR CREEK COUNTY 12/05/07 6.00 600.00 1220.00 820.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 600.00 1220.00 820.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 600.00 1220.00 820.00 =============== 601-21010 Precast Concrete Unit Cubic Yard ============================================= BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 66.00 1320.00 1383.60 600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 66.00 1320.00 1383.60 600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 66.00 1320.00 1383.60 600.00 =============== 601-25730 Precast Deck Panel (3 In) Sq Yard ================================================ BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 1,839.00 55.00 83.17 78.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,839.00 55.00 83.17 78.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 221 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-25730 Precast Deck Panel (3 In) Sq Yard ================================================ BR 0253-192 I-25&128TH 08/16/07 1,310.00 90.00 86.19 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,310.00 90.00 86.19 80.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,149.00 69.56 84.29 78.83 =============== 601-40002 Masonry Veneer (Brick) Sq Foot ================================================ BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 768.00 35.00 33.09 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 768.00 35.00 33.09 14.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 768.00 35.00 33.09 14.00 =============== 601-40006 Cut Stone Veneer (Slab) Sq Foot ================================================ BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 444.00 75.00 58.26 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 444.00 75.00 58.26 25.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 444.00 75.00 58.26 25.00 =============== 601-40007 Cut Stone Veneer (Ashler) Sq Foot ================================================ BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 516.00 50.00 44.53 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 516.00 50.00 44.53 16.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 516.00 50.00 44.53 16.00 =============== 601-40010 Masonry Wall Sq Foot ================================================ BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 1,792.00 25.00 32.30 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,792.00 25.00 32.30 10.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,792.00 25.00 32.30 10.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 222 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-40250 Bridge Deck Finish (Saw Grv) Sq Yard ================================================ STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 644.00 10.15 7.48 7.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 644.00 10.15 7.48 7.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 644.00 10.15 7.48 7.25 =============== 601-40300 Struct Conc Coating Sq Yard ================================================ IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 6,379.00 5.00 5.64 5.37 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 736.00 15.00 11.51 28.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7,115.00 6.03 6.51 7.76 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 1,263.00 10.00 9.80 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,263.00 10.00 9.80 9.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,378.00 6.63 7.17 7.95 =============== 601-40301 Struct Conc Coating Sq Foot ================================================ BR 0253-192 I-25&128TH 08/16/07 14,759.00 6.00 0.87 1.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 14,759.00 6.00 0.87 1.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14,759.00 6.00 0.87 1.15 =============== 601-40302 Struct Conc Coating (Anti-Graf) Sq Foot ================================================ IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 16,256.00 1.35 0.78 0.74 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16,256.00 1.35 0.78 0.74 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16,256.00 1.35 0.78 0.74 =============== 601-40401 Struct Conc Stain Sq Foot ================================================ BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 245,654.00 1.50 0.71 0.40 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 223 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-40401 Struct Conc Stain Sq Foot ================================================ STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 13,945.00 2.05 1.06 1.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 259,599.00 1.53 0.75 0.45 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 6,032.00 1.00 3.73 4.50 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 5,756.00 1.60 4.17 1.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 11,788.00 1.29 3.91 2.79 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 271,387.00 1.52 1.13 0.55 =============== 601-50000 Glazed Wall Tile Sq Foot ================================================ C0702-273 I-70 GLENWOOD CANYON 08/09/07 60,000.00 40.00 25.00 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 60,000.00 40.00 25.00 25.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 60,000.00 40.00 25.00 25.00 =============== 601-50010 Glazed Wall Tile (Spare) Each =================================================== C0702-273 I-70 GLENWOOD CANYON 08/09/07 55,000.00 2.50 1.00 1.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 55,000.00 2.50 1.00 1.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 55,000.00 2.50 1.00 1.00 =============== 602-00000 Reinf Steel Pound ================================================== STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 3,188.00 2.00 2.01 2.10 HB 149A-023 SOUTH FORK TO CREEDE - SHOULD 02/08/07 715.00 6.00 8.98 16.00 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 2,400.00 2.00 1.87 1.62 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6,303.00 2.45 2.56 3.49 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 768.00 1.92 2.06 1.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 224 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 602-00000 Reinf Steel Pound ================================================== NH 0405-025 KIT CARSON BRIDGE 04/26/07 64,023.00 0.77 0.89 0.75 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 9,162.00 1.20 0.97 0.90 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 23,037.00 0.80 0.70 0.79 IM 0253-196 I-25: 48TH AVE TO US 36 225: 05/31/07 390.00 5.00 2.65 1.00 STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 14,342.00 1.25 1.89 2.00 BR 059A-032 ON SH 59 IN SEDGWICK COUNTY 06/07/07 1,399.00 1.00 1.91 2.00 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 1,353.00 1.18 1.95 2.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 114,474.00 0.90 1.09 0.97 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 3,287.00 2.00 1.95 2.10 BR 0253-192 I-25&128TH 08/16/07 37,463.00 0.90 0.74 0.71 CR100-126 WEST OF KIT CARSON 08/16/07 16,087.00 1.64 1.61 1.50 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 119.00 5.00 2.25 2.00 C0701-190 26.5 ROAD/I-70 BRIDGE REPAIR 08/27/07 2,795.00 0.40 3.20 0.40 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 582,071.00 1.10 1.16 1.00 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 341,963.00 1.00 0.95 0.71 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 53,473.00 1.00 1.18 0.90 C R600 - 300 VARIOUS LOCATIONS IN REGION 6 09/27/07 2,500.00 2.50 2.20 1.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,039,758.00 1.07 1.08 0.90 BR R300-130 I-70 (VARIOUS LOCATIONS) 10/18/07 8,827.00 1.00 1.70 1.00 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 130.00 10.00 1.63 1.00 BR 0241-047 US 24, 2 MI S OF GRANITE, CHA 11/15/07 2,480.00 2.00 2.20 3.13 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 17,167.00 0.80 0.90 1.01 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 43,685.00 0.85 1.03 1.10 C120A-007 ON SH 120 AT PORTLAND OVER TH 11/29/07 100.00 3.00 24.75 30.00 C0703-338 CLEAR CREEK COUNTY 12/05/07 758.00 3.00 2.10 2.80 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 24,244.00 1.00 0.86 0.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 97,391.00 0.95 1.05 1.07 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,257,926.00 1.05 1.09 0.93 =============== 602-00020 Reinf Steel (Epoxy) Pound ================================================== BR 109A-018 SH 109 LA JUNTA, SH50, MANZI 01/11/07 60,253.00 1.15 1.05 1.00 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 15,010.00 1.10 2.08 2.20 NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 200.00 2.50 2.75 2.75 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 225 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 602-00020 Reinf Steel (Epoxy) Pound ================================================== NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 5,966.00 2.20 2.12 0.92 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 9,107.00 1.80 1.21 1.15 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 6,843.00 1.50 1.63 1.60 SHE 0504-050 INTERSECTION OF SH 50B AND SH 03/22/07 540.00 4.00 2.66 3.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 97,919.00 1.31 1.45 1.25 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 558.00 3.40 2.63 2.00 NH 0405-025 KIT CARSON BRIDGE 04/26/07 147,809.00 0.84 1.04 1.00 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 226,698.00 0.90 0.97 0.90 STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 4,460.00 3.59 3.05 2.95 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 1,232,923.00 0.85 0.78 0.87 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 247,943.00 0.85 0.87 0.75 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 19,330.00 1.00 0.95 0.85 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 97,510.00 1.10 1.21 1.18 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,977,231.00 0.88 0.88 0.89 BRR500-087 US 160 PAGOSA SPRINGS 07/12/07 236.00 6.00 4.50 3.00 NH 5502-055 COALBANK PASS 08/09/07 33.30 5.00 30.02 30.03 BR 0253-192 I-25&128TH 08/16/07 147,145.00 1.05 0.86 0.84 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 2,156,081.00 1.20 1.29 1.15 C0701-187 I-70 20 ROAD BRIDGE REPAIR 09/06/07 46,340.00 1.30 1.41 1.20 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 109,275.00 1.00 1.19 1.02 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,459,110.30 1.18 1.23 1.13 BR R300-130 I-70 (VARIOUS LOCATIONS) 10/18/07 1,183.00 1.50 9.33 2.50 STA 340A-013 SH 340 IN FRUITA 10/25/07 5,551.00 0.90 2.89 3.40 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 167,978.00 0.85 0.98 1.02 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 65,256.00 0.90 1.20 1.10 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 142,445.00 1.00 0.98 0.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 382,413.00 0.92 1.04 1.01 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,916,673.30 1.04 1.03 1.02 =============== 602-00200 Weld Reinf Steel Each =================================================== C0702-273 I-70 GLENWOOD CANYON 08/09/07 7,559.00 1.10 2.00 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7,559.00 1.10 2.00 2.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,559.00 1.10 2.00 2.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 226 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 602-20003 Outlet Structure (Spec) Each =================================================== BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 2.00 8000.00 4715.87 3054.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 8000.00 4715.87 3054.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 8000.00 4715.87 3054.30 =============== 603-00001 Annular Space Grouting Cubic Yard ============================================= BR 0241-047 US 24, 2 MI S OF GRANITE, CHA 11/15/07 150.00 1200.00 396.76 372.09 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 150.00 1200.00 396.76 372.09 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 150.00 1200.00 396.76 372.09 =============== 603-00025 Culvert Lining (24 Inch)(Special) Lin Foot =============================================== BR R300-130 I-70 (VARIOUS LOCATIONS) 10/18/07 93.00 400.00 1083.33 950.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 93.00 400.00 1083.33 950.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 93.00 400.00 1083.33 950.00 =============== 603-00042 Culvert Lining (42 Inch) Lin Foot =============================================== BR R300-130 I-70 (VARIOUS LOCATIONS) 10/18/07 508.00 320.00 275.33 255.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 508.00 320.00 275.33 255.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 508.00 320.00 275.33 255.00 =============== 603-00048 Culvert Lining (48 In) Lin Foot =============================================== BR R300-130 I-70 (VARIOUS LOCATIONS) 10/18/07 508.00 340.00 321.67 285.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 508.00 340.00 321.67 285.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 508.00 340.00 321.67 285.00 =============== 603-00049 Culvert Lining (48 Inch)(Special) Lin Foot =============================================== BR R300-130 I-70 (VARIOUS LOCATIONS) 10/18/07 105.00 1100.00 1935.00 1880.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 105.00 1100.00 1935.00 1880.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 105.00 1100.00 1935.00 1880.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 227 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-00054 Culvert Lining (54 In) Lin Foot =============================================== BR R300-130 I-70 (VARIOUS LOCATIONS) 10/18/07 486.00 360.00 395.67 315.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 486.00 360.00 395.67 315.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 486.00 360.00 395.67 315.00 =============== 603-01125 12 In RCP (CIP) Lin Foot =============================================== NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 159.00 75.00 100.22 69.66 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 159.00 75.00 100.22 69.66 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 159.00 75.00 100.22 69.66 =============== 603-01155 15 In RCP (CIP) Lin Foot =============================================== STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 16.00 100.00 127.13 57.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16.00 100.00 127.13 57.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 100.00 127.13 57.00 =============== 603-01180 18 In RCP Lin Foot =============================================== BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 451.00 85.00 67.35 78.00 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 80.00 90.00 180.00 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 531.00 85.75 72.78 96.38 BR 0253-192 I-25&128TH 08/16/07 95.00 78.00 93.56 95.00 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 27.80 100.00 231.81 130.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 111.00 90.00 125.88 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 233.80 86.31 116.17 106.28 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 964.00 84.50 76.80 54.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 228 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-01180 18 In RCP Lin Foot =============================================== BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 111.00 55.00 100.41 70.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,075.00 81.45 78.68 55.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,839.80 83.31 80.02 73.84 =============== 603-01185 18 In RCP (CIP) Lin Foot =============================================== NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 1,732.00 55.00 95.81 73.44 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 8.00 120.00 155.63 58.00 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 55.00 80.00 100.56 37.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,795.00 56.06 96.92 72.27 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 2,718.00 60.00 41.61 36.42 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 84.00 65.00 75.00 55.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 1,965.00 45.00 87.00 52.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4,767.00 53.90 57.82 43.17 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 229.00 80.00 85.14 45.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 763.00 75.00 109.05 79.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 992.00 76.15 102.52 71.15 CC 0821-084 SH82 ASPEN 12/20/07 104.00 90.00 162.53 128.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 104.00 90.00 162.53 128.70 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,658.00 57.78 75.19 54.78 =============== 603-01240 24 In RCP Lin Foot =============================================== NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 367.00 65.00 76.05 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 367.00 65.00 76.05 90.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 229 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-01240 24 In RCP Lin Foot =============================================== HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 328.00 54.24 93.32 60.00 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 328.00 90.00 108.00 100.00 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 72.00 100.00 102.19 102.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 728.00 74.88 98.32 82.18 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 1,312.70 85.00 92.40 71.20 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 129.00 100.00 156.38 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,441.70 86.34 95.40 74.67 STA 340A-013 SH 340 IN FRUITA 10/25/07 258.00 85.00 105.44 93.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 1,505.00 96.25 77.89 45.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 154.00 75.00 104.81 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,917.00 93.03 81.70 55.88 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,453.70 85.59 88.34 69.07 =============== 603-01245 24 In RCP (CIP) Lin Foot =============================================== STA 012A-042 SH 12, S. OF LA VETA 01/18/07 598.00 90.00 140.33 91.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 667.00 85.00 105.00 81.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,265.00 87.36 127.68 85.73 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 8.00 200.00 118.28 128.10 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 3,032.00 60.00 49.88 42.51 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 109.00 75.00 93.67 71.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 487.00 55.00 112.00 78.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,636.00 60.09 57.57 48.31 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 356.00 100.00 121.12 92.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 356.00 100.00 121.12 92.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 230 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-01245 24 In RCP (CIP) Lin Foot =============================================== C R400-217 SIGNALS @ SH66 & CR13 10/04/07 12.00 70.00 77.18 60.00 CC 0821-084 SH82 ASPEN 12/20/07 2,187.00 100.00 146.37 112.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,199.00 99.84 145.68 111.92 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,456.00 78.34 105.80 75.50 =============== 603-01275 27 In RCP (CIP) Lin Foot =============================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 212.00 105.00 147.08 95.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 212.00 105.00 147.08 95.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 212.00 105.00 147.08 95.00 =============== 603-01300 30 In RCP Lin Foot =============================================== STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 387.00 120.00 145.25 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 387.00 120.00 145.25 110.00 STA 340A-013 SH 340 IN FRUITA 10/25/07 6.00 120.00 201.83 130.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 1,617.00 135.00 91.92 58.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,623.00 134.94 92.12 58.27 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,010.00 132.07 97.79 68.23 =============== 603-01305 30 In RCP (CIP) Lin Foot =============================================== STA 012A-042 SH 12, S. OF LA VETA 01/18/07 164.00 110.00 155.83 104.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 175.00 105.00 135.03 136.08 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 339.00 107.42 148.59 120.56 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 71.00 70.00 75.60 83.90 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 231 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-01305 30 In RCP (CIP) Lin Foot =============================================== STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 37.00 100.00 141.00 160.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 108.00 80.28 93.98 109.97 CC 0821-084 SH82 ASPEN 12/20/07 447.00 150.00 160.25 126.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 447.00 150.00 160.25 126.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 894.00 125.43 150.71 122.25 =============== 603-01360 36 In RCP Lin Foot =============================================== HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 51.00 266.17 137.33 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 51.00 266.17 137.33 140.00 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 57.00 150.00 164.43 146.93 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 57.00 150.00 164.43 146.93 STA 340A-013 SH 340 IN FRUITA 10/25/07 132.00 140.00 161.04 145.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 132.00 140.00 161.04 145.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 240.00 169.19 155.88 144.40 =============== 603-01365 36 In RCP (CIP) Lin Foot =============================================== STA 012A-042 SH 12, S. OF LA VETA 01/18/07 108.00 130.00 178.50 128.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 4,556.00 80.00 142.05 137.16 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 140.00 85.00 160.93 81.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,804.00 81.27 145.24 135.32 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 1,031.00 75.00 80.50 69.49 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,031.00 75.00 80.50 69.49 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 232 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-01365 36 In RCP (CIP) Lin Foot =============================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 763.00 120.00 187.27 137.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 763.00 120.00 187.27 137.00 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 222.00 85.00 110.22 95.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 222.00 85.00 110.22 95.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,820.00 84.78 136.39 124.24 =============== 603-01425 42 In RCP (CIP) Lin Foot =============================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 98.00 140.00 616.66 199.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 98.00 140.00 616.66 199.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 98.00 140.00 616.66 199.00 =============== 603-01545 54 In RCP (CIP) Lin Foot =============================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 859.00 150.00 128.87 118.46 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 859.00 150.00 128.87 118.46 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 6.00 200.00 692.18 355.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 200.00 692.18 355.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 865.00 150.35 132.77 120.10 =============== 603-01600 60 In RCP Lin Foot =============================================== STA 0661-009 ON SH 66 IN WELD COUNTY 02/01/07 123.00 245.00 188.14 220.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 123.00 245.00 188.14 220.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 123.00 245.00 188.14 220.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 233 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-02180 23x14 In RCP Lin Foot =============================================== NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 101.00 100.00 135.25 104.76 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 101.00 100.00 135.25 104.76 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 101.00 100.00 135.25 104.76 =============== 603-02185 23x14 In RCP (CIP) Lin Foot =============================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 40.00 90.00 317.52 168.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 40.00 90.00 317.52 168.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 90.00 317.52 168.00 =============== 603-02240 30x19 In RCP Lin Foot =============================================== HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 64.00 100.00 137.61 114.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 64.00 100.00 137.61 114.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 64.00 100.00 137.61 114.85 =============== 603-02300 38x24 In RCP Lin Foot =============================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 1,510.00 125.00 82.63 77.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,510.00 125.00 82.63 77.50 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 10.00 120.00 305.61 271.37 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 120.00 305.61 271.37 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,520.00 124.97 85.54 78.78 =============== 603-02425 53x34 In RCP (CIP) Lin Foot =============================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 52.00 200.00 608.22 263.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 52.00 200.00 608.22 263.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 52.00 200.00 608.22 263.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 234 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-02480 60x38 In RCP Lin Foot =============================================== NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 130.00 250.00 207.20 210.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 130.00 250.00 207.20 210.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 426.00 130.00 160.55 131.18 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 426.00 130.00 160.55 131.18 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 556.00 158.06 173.43 149.61 =============== 603-02485 60x30 In. RCP (CIP) Lin Foot =============================================== C R400-217 SIGNALS @ SH66 & CR13 10/04/07 92.00 250.00 201.57 180.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 92.00 250.00 201.57 180.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 92.00 250.00 201.57 180.00 =============== 603-03180 18 In RCP Spec Lin Foot =============================================== CC 0821-084 SH82 ASPEN 12/20/07 37.00 40.00 149.88 146.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 37.00 40.00 149.88 146.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 37.00 40.00 149.88 146.30 =============== 603-03361 Inst 36 In RCP (Spec) Lin Foot =============================================== NH 5502-055 COALBANK PASS 08/09/07 56.00 250.00 351.79 53.57 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 56.00 250.00 351.79 53.57 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 56.00 250.00 351.79 53.57 =============== 603-03601 Inst 60 In RCP (Spec) Lin Foot =============================================== BRR500-087 US 160 PAGOSA SPRINGS 07/12/07 112.50 1200.00 1334.00 1528.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 112.50 1200.00 1334.00 1528.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 112.50 1200.00 1334.00 1528.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 235 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-05018 18 In RCES Each =================================================== SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 2.00 700.00 796.22 475.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 700.00 796.22 475.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 18.00 650.00 685.92 947.17 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 2.00 700.00 850.00 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20.00 655.00 698.54 902.45 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 8.00 750.00 772.83 675.00 BR 0253-192 I-25&128TH 08/16/07 2.00 700.00 781.17 680.00 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 1.00 1000.00 1034.38 900.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 1.00 800.00 946.38 930.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.00 766.67 796.06 715.83 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 3.00 782.00 813.68 530.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 1.00 650.00 1182.95 600.00 CC 0821-084 SH82 ASPEN 12/20/07 2.00 1000.00 887.33 902.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 832.67 887.48 665.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 717.40 776.86 789.58 =============== 603-05024 24 In RCES Each =================================================== STA 012A-042 SH 12, S. OF LA VETA 01/18/07 30.00 1000.00 1098.50 721.00 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 4.00 1000.00 915.00 900.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 2.00 1100.00 1520.11 1220.08 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 36.00 1005.56 1092.96 768.62 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 3.00 673.93 884.20 810.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 236 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-05024 24 In RCES Each =================================================== STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 8.00 650.00 1070.00 1000.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 13.00 800.00 781.05 1019.71 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 2.00 980.00 1042.54 1653.00 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 3.00 750.00 923.33 570.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 29.00 752.82 898.07 989.73 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 23.00 800.00 1102.63 1139.06 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 23.00 800.00 1102.63 1139.06 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 1.00 1000.00 748.90 440.00 STA 340A-013 SH 340 IN FRUITA 10/25/07 5.00 875.00 991.50 955.00 CC 0821-084 SH82 ASPEN 12/20/07 2.00 1200.00 1039.42 1017.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8.00 971.88 942.81 906.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 96.00 877.15 1042.21 935.63 =============== 603-05030 30 In RCES Each =================================================== NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 1.00 1400.00 1564.37 1349.36 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1400.00 1564.37 1349.36 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 1.00 900.00 865.31 1109.73 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 1.00 1000.00 1286.67 1600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 950.00 1045.89 1354.87 STA 340A-013 SH 340 IN FRUITA 10/25/07 1.00 1350.00 1327.50 1365.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 1.00 1272.00 1092.95 1200.00 CC 0821-084 SH82 ASPEN 12/20/07 1.00 1500.00 1281.83 1155.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 1374.00 1208.03 1240.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 1237.00 1205.68 1296.52 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 237 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-05036 36 In RCES Each =================================================== SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 2.00 1200.00 1332.16 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1200.00 1332.16 1100.00 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 1.00 1166.67 1481.12 1900.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 9.00 1000.00 1121.12 1378.49 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 1.00 1000.00 1756.67 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 11.00 1015.15 1217.35 1482.40 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 2.00 1100.00 1728.29 1916.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 1100.00 1728.29 1916.35 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 2.00 1400.00 1146.98 840.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 1400.00 1146.98 840.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17.00 1092.16 1303.15 1412.89 =============== 603-05054 54 In RCES Each =================================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 1.00 2000.00 1485.31 1671.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 2000.00 1485.31 1671.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2000.00 1485.31 1671.75 =============== 603-05060 60 In RCES Each =================================================== STA 0661-009 ON SH 66 IN WELD COUNTY 02/01/07 2.00 2000.00 2417.95 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 2000.00 2417.95 2000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 2000.00 2417.95 2000.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 238 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-05124 30x19 In RCES Each =================================================== HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 2.00 900.00 1560.25 1812.01 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 900.00 1560.25 1812.01 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 900.00 1560.25 1812.01 =============== 603-05130 38x24 In RCES Each =================================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 3.00 1100.00 910.58 1095.33 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 1100.00 910.58 1095.33 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 1.00 900.00 1975.84 2428.73 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 900.00 1975.84 2428.73 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 1050.00 1336.69 1428.68 =============== 603-05148 60x38 In RCES Each =================================================== NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 2.00 1750.00 2416.00 4000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1750.00 2416.00 4000.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 2.00 2500.00 1442.13 1572.53 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 2500.00 1442.13 1572.53 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 2.00 2500.00 1535.81 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 2500.00 1535.81 1100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 2250.00 1737.12 2224.18 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 239 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-07240 24 In RCP (Jacked) Lin Foot =============================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 120.00 1800.00 990.30 764.18 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 120.00 1800.00 990.30 764.18 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 120.00 1800.00 990.30 764.18 =============== 603-07300 30 In RCP (Jacked) Lin Foot =============================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 196.00 700.00 835.08 523.83 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 196.00 700.00 835.08 523.83 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 196.00 700.00 835.08 523.83 =============== 603-07360 36 In RCP (Jacked) Lin Foot =============================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 298.00 800.00 945.10 697.91 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 138.00 900.00 899.67 950.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 436.00 831.65 933.39 777.70 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 436.00 831.65 933.39 777.70 =============== 603-10120 12 In CSP Lin Foot =============================================== NH 0402-070 US 40 ROUTT COUNTY 02/08/07 388.00 50.00 39.50 47.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 388.00 50.00 39.50 47.00 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 120.00 44.29 50.04 64.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 120.00 44.29 50.04 64.00 BRR500-087 US 160 PAGOSA SPRINGS 07/12/07 80.00 400.00 513.00 231.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 240 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-10120 12 In CSP Lin Foot =============================================== SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 60.00 40.00 68.00 68.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 140.00 245.71 391.64 161.14 STA 340A-013 SH 340 IN FRUITA 10/25/07 14.00 55.00 83.81 51.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 14.00 55.00 83.81 51.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 662.00 90.46 88.90 74.31 =============== 603-10180 18 In CSP Lin Foot =============================================== NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 60.00 44.00 50.70 60.00 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 127.00 60.00 58.28 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 187.00 54.87 56.14 60.00 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 15.00 58.21 95.32 140.00 NH 0405-025 KIT CARSON BRIDGE 04/26/07 74.00 52.69 81.34 50.00 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 20.00 65.00 511.67 350.00 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 60.00 60.00 57.53 38.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 169.00 57.23 104.14 89.41 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 390.00 50.00 61.79 51.84 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 390.00 50.00 61.79 51.84 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 50.00 65.00 73.92 55.56 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 50.00 65.00 73.92 55.56 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 796.00 53.62 67.79 61.97 =============== 603-10240 24 In CSP Lin Foot =============================================== NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 6.00 100.00 135.00 135.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 100.00 135.00 135.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 241 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-10240 24 In CSP Lin Foot =============================================== STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 66.00 55.00 416.67 300.00 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 28.00 125.00 67.60 60.40 IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 138.00 65.00 82.50 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 232.00 69.40 192.56 140.22 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 8.00 200.00 182.50 215.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 11.00 200.00 199.25 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 19.00 200.00 194.78 293.16 BR R300-130 I-70 (VARIOUS LOCATIONS) 10/18/07 84.00 90.00 152.67 120.00 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 28.00 100.00 108.94 72.22 SHE 160A-009 U.S. 160 MP 94.15 - MP 96.63 12/20/07 146.00 70.00 89.94 110.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 258.00 79.77 108.86 109.39 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 515.00 79.77 142.83 130.36 =============== 603-10300 30 In CSP Lin Foot =============================================== SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 20.00 160.00 104.71 62.00 SHE 0504-050 INTERSECTION OF SH 50B AND SH 03/22/07 21.00 100.00 143.59 92.56 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 41.00 129.27 119.74 77.65 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 50.00 120.00 106.12 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 50.00 120.00 106.12 100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 91.00 124.18 114.56 89.93 =============== 603-10360 36 In CSP Lin Foot =============================================== SHE 160A-009 U.S. 160 MP 94.15 - MP 96.63 12/20/07 20.00 90.00 210.96 130.22 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 20.00 90.00 210.96 130.22 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 90.00 210.96 130.22 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 242 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-10480 48 In CSP Lin Foot =============================================== IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 78.00 175.00 154.00 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 78.00 175.00 154.00 140.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 78.00 175.00 154.00 140.00 =============== 603-10720 72 In CSP Lin Foot =============================================== STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 64.00 150.00 254.80 275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 64.00 150.00 254.80 275.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 64.00 150.00 254.80 275.00 =============== 603-15024 24 In Equiv CSPA Lin Foot =============================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 33.00 70.00 69.80 37.69 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 33.00 70.00 69.80 37.69 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 33.00 70.00 69.80 37.69 =============== 603-30015 15 In SES Each =================================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 4.00 300.00 304.86 421.92 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 300.00 304.86 421.92 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 300.00 304.86 421.92 =============== 603-30018 18 In SES Each =================================================== STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 8.00 300.00 450.00 400.00 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 2.00 250.00 468.93 261.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 290.00 456.31 372.20 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 16.00 400.00 353.96 328.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 16.00 400.00 353.96 328.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26.00 357.69 376.42 345.40 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 243 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-30024 24 In SES Each =================================================== NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 5.00 450.00 1110.00 1110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 450.00 1110.00 1110.00 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 1.00 439.44 688.06 1200.00 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 17.00 350.00 545.00 450.00 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 2.00 400.00 347.48 409.90 IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 3.00 400.00 725.00 650.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 23.00 364.76 551.96 505.21 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 1.00 500.00 551.04 500.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 1.00 600.00 791.00 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 550.00 711.01 800.00 BR R300-130 I-70 (VARIOUS LOCATIONS) 10/18/07 1.00 600.00 2791.67 725.00 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 2.00 600.00 509.72 388.89 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 600.00 1132.07 500.93 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 33.00 410.29 659.68 614.32 =============== 603-30030 30 In SES Each =================================================== IM 0703-319 EJMT 24.9 KV SERVICE 01/25/07 2.00 900.00 589.20 400.80 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 1.00 550.00 690.86 615.00 SHE 0504-050 INTERSECTION OF SH 50B AND SH 03/22/07 2.00 750.00 782.26 505.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 770.00 708.25 485.48 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 1.00 750.00 718.06 722.22 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 750.00 718.06 722.22 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 766.67 709.47 524.94 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 244 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-30036 36 In SES Each =================================================== NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 2.00 600.00 1110.00 1110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 600.00 1110.00 1110.00 SHE 160A-009 U.S. 160 MP 94.15 - MP 96.63 12/20/07 2.00 1100.00 2332.32 877.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 1100.00 2332.32 877.95 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 850.00 2087.86 993.98 =============== 603-30048 48 In SES Each =================================================== IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 1.00 1450.00 1450.00 1800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 1450.00 1450.00 1800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1450.00 1450.00 1800.00 =============== 603-33036 36 In Pipe Safety End Treat Each =================================================== STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 1.00 3500.00 2057.67 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 3500.00 2057.67 2000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 3500.00 2057.67 2000.00 =============== 603-50008 8 In Plastic Pipe Lin Foot =============================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 166.00 60.00 109.36 48.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 166.00 60.00 109.36 48.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 166.00 60.00 109.36 48.00 =============== 603-50012 12 In Plastic Pipe Lin Foot =============================================== IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 250.00 75.00 80.00 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 250.00 75.00 80.00 40.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 250.00 75.00 80.00 40.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 245 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-50015 15 In Plastic Pipe Lin Foot =============================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 241.00 55.00 50.91 36.64 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 120.00 60.00 66.16 54.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 361.00 56.66 58.01 42.58 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 361.00 56.66 58.01 42.58 =============== 603-50024 24 In Plastic Pipe Lin Foot =============================================== IM 0703-319 EJMT 24.9 KV SERVICE 01/25/07 40.00 120.00 71.31 35.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 40.00 120.00 71.31 35.80 C065A-020 SH65 GRAND MESA SLIDE REPAIR 07/26/07 48.00 35.00 196.67 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 48.00 35.00 196.67 140.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 88.00 73.64 139.69 92.64 =============== 603-50072 72 In plastic Pipe Lin Foot =============================================== BR 0241-047 US 24, 2 MI S OF GRANITE, CHA 11/15/07 326.00 700.00 548.39 499.31 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 326.00 700.00 548.39 499.31 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 326.00 700.00 548.39 499.31 =============== 603-70606 6x6 Ft CBC (Precast) Lin Foot =============================================== HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 61.00 566.67 585.32 610.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 61.00 566.67 585.32 610.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 61.00 566.67 585.32 610.00 =============== 603-71006 10x6 Ft CBC (Precast) Lin Foot =============================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 373.00 500.00 570.99 539.94 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 373.00 500.00 570.99 539.94 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 373.00 500.00 570.99 539.94 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 246 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-71008 10x8 Ft CBC (Precast) Lin Foot =============================================== HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 140.00 1000.00 1242.92 1046.38 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 140.00 1000.00 1242.92 1046.38 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 140.00 1000.00 1242.92 1046.38 =============== 603-72008 20x8 Ft CBC (Precast) Lin Foot =============================================== BR 059A-032 ON SH 59 IN SEDGWICK COUNTY 06/07/07 60.00 1980.00 2512.39 2050.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 60.00 1980.00 2512.39 2050.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 60.00 1980.00 2512.39 2050.00 =============== 603-82012 12 In Duct Iron Pipe Lin Foot =============================================== SHE 5502-054 02/22/07 132.00 60.00 71.59 43.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 132.00 60.00 71.59 43.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 132.00 60.00 71.59 43.50 =============== 604-00305 Inlet Ty C (5 Ft) Each =================================================== NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 5.00 3000.00 2175.00 2200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 3000.00 2175.00 2200.00 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 1.00 3500.00 3538.00 3152.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 7.00 2600.00 2655.01 1797.52 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 1.00 2800.00 3957.36 6159.50 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 2.00 2500.00 3210.00 2300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 11.00 2681.82 3010.08 2408.56 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 2.00 4000.00 2475.22 1966.75 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 247 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-00305 Inlet Ty C (5 Ft) Each =================================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 1.00 2800.00 3692.30 2366.50 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 1.00 3500.00 3833.50 3400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 3575.00 2904.45 2425.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 4.00 2891.00 3493.36 3400.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 2.00 3000.00 3631.82 3000.00 CC 0821-084 SH82 ASPEN 12/20/07 4.00 2550.00 4011.25 3217.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 2776.40 3700.58 3247.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 2885.47 3155.40 2655.47 =============== 604-00310 Inlet Ty C (10 Ft) Each =================================================== NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 1.00 3200.00 2840.00 2800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 3200.00 2840.00 2800.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 4.00 3200.00 3512.96 2296.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 3200.00 3512.96 2296.85 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 3.00 4000.00 3546.05 2950.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 4000.00 3546.05 2950.42 CC 0821-084 SH82 ASPEN 12/20/07 4.00 2750.00 5121.00 3465.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 2750.00 5121.00 3465.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 3250.00 4035.02 2891.56 =============== 604-00350 Inlet Ty C (Spec) Each =================================================== STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 1.00 4000.00 8420.00 6600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 4000.00 8420.00 6600.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 248 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-00350 Inlet Ty C (Spec) Each =================================================== STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 1.00 4350.00 5747.34 6300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 4350.00 5747.34 6300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 4175.00 6476.25 6450.00 =============== 604-00505 Inlet Ty D (5 Ft) Each =================================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 2.00 4000.00 3929.25 3994.49 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 4000.00 3929.25 3994.49 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 4000.00 3929.25 3994.49 =============== 604-00510 Inlet Ty D (10 Ft) Each =================================================== STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 1.00 3500.00 5627.00 5200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 3500.00 5627.00 5200.00 NH 5502-055 COALBANK PASS 08/09/07 1.00 8000.00 3625.00 3500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 8000.00 3625.00 3500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 5750.00 4826.20 4350.00 =============== 604-00515 Inlet Ty D (15 Ft) Each =================================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 1.00 6500.00 5829.97 4793.39 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 6500.00 5829.97 4793.39 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 6500.00 5829.97 4793.39 =============== 604-00550 Inlet Ty D (Spec) Each =================================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 6.00 4200.00 5189.43 4194.22 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 249 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-00550 Inlet Ty D (Spec) Each =================================================== BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 1.00 8000.00 7505.91 8582.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 1.00 8000.00 7496.67 8800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 5150.00 5869.93 5318.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 5150.00 5869.93 5318.42 =============== 604-13005 Inlet Ty 13 (5 Ft) Each =================================================== NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 1.00 4300.00 3088.91 2885.47 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 4300.00 3088.91 2885.47 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 1.00 3000.00 5250.00 4500.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 2.00 4000.00 3190.00 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 3666.67 3705.00 3166.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 3825.00 3536.97 3096.37 =============== 604-13010 Inlet Ty 13 (10 Ft) Each =================================================== NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 1.00 5500.00 5132.18 7952.54 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 5500.00 5132.18 7952.54 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5500.00 5132.18 7952.54 =============== 604-13653 Inlet Ty 13 (5 Ft)(Spec)(3 Unit) Each =================================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 1.00 8000.00 7249.63 3923.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 8000.00 7249.63 3923.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 8000.00 7249.63 3923.50 =============== 604-13662 Inlet Ty 13 (5 Ft)(Swpr)(2 Unit) Each =================================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 1.00 6000.00 6911.39 3923.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 6000.00 6911.39 3923.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 6000.00 6911.39 3923.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 250 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-13663 Inlet Ty 13 (5 Ft)(Swpr)(3 Unit) Each =================================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 1.00 9000.00 8378.75 3923.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 9000.00 8378.75 3923.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 9000.00 8378.75 3923.50 =============== 604-13672 Inlet Ty 13 (10 Ft)(Swpr)(2 Unit) Each =================================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 1.00 10000.00 8476.25 4468.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 10000.00 8476.25 4468.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 10000.00 8476.25 4468.50 =============== 604-13673 Inlet Ty 13 (10 Ft)(Swpr)(3 Unit) Each =================================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 1.00 15000.00 10028.75 4468.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 15000.00 10028.75 4468.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 15000.00 10028.75 4468.50 =============== 604-13674 Inlet Ty 13 (10 Ft)(Swpr)(4 Unit) Each =================================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 2.00 20000.00 11077.38 5013.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 20000.00 11077.38 5013.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 20000.00 11077.38 5013.50 =============== 604-13675 Inlet Ty 13 (10 Ft)(Swpr)(5 Unit) Each =================================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 2.00 25000.00 12348.38 5831.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 25000.00 12348.38 5831.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 25000.00 12348.38 5831.50 =============== 604-13676 Inlet Ty 13 (10 Ft)(Swpr)(6 Unit) Each =================================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 1.00 30000.00 14748.00 7448.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 30000.00 14748.00 7448.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 30000.00 14748.00 7448.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 251 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-13681 Inlet Ty 13 (10 Ft)(Spec)(1 Unit) Each =================================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 1.00 6000.00 7170.13 7448.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 6000.00 7170.13 7448.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 6000.00 7170.13 7448.50 =============== 604-16005 Inlet Ty 16 (5 Ft) Each =================================================== STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 2.00 4355.25 4155.99 3600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 4355.25 4155.99 3600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 4355.25 4155.99 3600.00 =============== 604-16010 Inlet Ty 16 (10 Ft) Each =================================================== STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 1.00 5289.75 5434.22 5200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 5289.75 5434.22 5200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5289.75 5434.22 5200.00 =============== 604-16505 Inlet Ty 16 (D) (5 Ft) Each =================================================== STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 2.00 7500.00 6059.75 6300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 7500.00 6059.75 6300.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 5.00 5739.75 5867.97 5200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 5739.75 5867.97 5200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 6242.68 5899.93 5514.29 =============== 604-16605 Inlet Ty 16 (T) (5 Ft) Each =================================================== STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 1.00 8500.00 9776.63 11300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 8500.00 9776.63 11300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 8500.00 9776.63 11300.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 252 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-16610 Inlet Ty 16 (T) (10 Ft) Each =================================================== STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 1.00 8500.00 11585.13 12000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 8500.00 11585.13 12000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 8500.00 11585.13 12000.00 =============== 604-19000 Inlet Spec Each =================================================== C 0504-055 PUEBLO COUNTY, US-50C AT SALT 11/01/07 2.00 4000.00 5833.33 3700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 4000.00 5833.33 3700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 4000.00 5833.33 3700.00 =============== 604-19105 Inlet Ty R L5 (5 Ft) Each =================================================== NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 15.00 3800.00 5066.14 5190.16 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 2.00 3500.00 4202.88 3440.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 17.00 3764.71 4839.71 4984.26 STA 340A-013 SH 340 IN FRUITA 10/25/07 4.00 5000.00 6862.50 7500.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 3.00 3493.75 4323.71 4200.00 CC 0821-084 SH82 ASPEN 12/20/07 11.00 2800.00 6051.67 4785.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 18.00 3404.51 5782.82 5290.83 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 35.00 3579.46 5438.33 5141.93 =============== 604-19110 Inlet Ty R L5 (10 Ft) Each =================================================== NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 17.00 5400.00 5766.40 6733.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 17.00 5400.00 5766.40 6733.45 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 1.00 4688.63 5760.28 7000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 4688.63 5760.28 7000.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 253 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-19110 Inlet Ty R L5 (10 Ft) Each =================================================== STA 340A-013 SH 340 IN FRUITA 10/25/07 1.00 7500.00 10992.00 12600.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 1.00 5336.00 5466.30 5000.00 CC 0821-084 SH82 ASPEN 12/20/07 4.00 5700.00 7454.67 5038.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 5939.33 7405.84 6292.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 24.00 5505.19 6393.82 6634.19 =============== 604-19205 Inlet Ty R L10 (5 Ft) Each =================================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 3.00 5000.00 4625.00 2896.01 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 5.00 5000.00 4283.33 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 5000.00 4435.19 2961.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 6.00 5200.00 6263.66 5500.00 CC 0821-084 SH82 ASPEN 12/20/07 2.00 4600.00 8030.83 6765.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8.00 5050.00 6617.09 5816.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 5025.00 5939.95 4388.63 =============== 604-19210 Inlet Ty R L10 (10 Ft) Each =================================================== NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 1.00 7500.00 4780.00 4000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 7500.00 4780.00 4000.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 5.00 6000.00 6300.00 5200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 6000.00 6300.00 5200.00 BR 0253-192 I-25&128TH 08/16/07 4.00 6000.00 7105.55 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 6000.00 7105.55 5000.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 254 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-19210 Inlet Ty R L10 (10 Ft) Each =================================================== STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 2.00 5832.75 7680.68 7500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 5832.75 7680.68 7500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 6097.13 6846.46 5416.67 =============== 604-19305 Inlet Ty R L15 (5 Ft) Each =================================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 16.00 6700.00 5560.12 3295.46 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16.00 6700.00 5560.12 3295.46 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 6700.00 5560.12 3295.46 =============== 604-19310 Inlet Ty R L15 (10 Ft) Each =================================================== HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 1.00 6403.40 9235.60 11000.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 1.00 8000.00 6718.56 4194.22 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 1.00 6000.00 9296.00 6718.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 6801.13 8529.39 7304.07 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 6801.13 8529.39 7304.07 =============== 604-19405 Inlet Ty R Spec (5 Ft) Each =================================================== HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 1.00 3250.00 5987.63 7000.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 1.00 5800.00 5959.87 3994.49 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 4525.00 5977.53 5497.25 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 1.00 7000.00 6730.84 5500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 7000.00 6730.84 5500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 5350.00 6093.43 5498.16 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 255 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-19410 Inlet Ty R Spec (10 Ft) Each =================================================== NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 7.00 6500.00 7007.17 8757.02 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7.00 6500.00 7007.17 8757.02 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 1.00 6200.00 6680.18 4194.22 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 6200.00 6680.18 4194.22 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 6462.50 6954.85 8186.67 =============== 604-20000 Outlet Structure Each =================================================== NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 1.00 11000.00 16498.34 8757.01 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 11000.00 16498.34 8757.01 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 1.00 10000.00 27412.38 14584.50 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 2.00 13500.00 14615.88 13100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 12333.33 18881.38 13594.83 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 12000.00 18404.77 12385.38 =============== 604-25000 Vane Grate Inlet Spec Each =================================================== BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 8.00 3500.00 5602.19 9399.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 3500.00 5602.19 9399.00 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 2.00 3500.00 6582.90 6275.52 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 4.00 4900.00 6940.71 9000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 4433.33 6808.88 8091.84 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 3900.00 6090.00 8838.79 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 256 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-25005 Vane Grate Inlet (5 Ft) Each =================================================== BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 1.00 3000.00 4338.01 7553.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 3000.00 4338.01 7553.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 3000.00 4338.01 7553.50 =============== 604-25006 Vane Grate Inlet Spec (5 Ft) Each =================================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 10.00 4200.00 4264.71 3395.32 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 4200.00 4264.71 3395.32 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 4200.00 4264.71 3395.32 =============== 604-26005 Vane Grate Inlet (D) (5 Ft) Each =================================================== IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 6.00 3000.00 5366.67 3900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 3000.00 5366.67 3900.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 3000.00 5366.67 3900.00 =============== 604-30000 MH Slab Base (Spec) Each =================================================== SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 1.00 1200.00 2933.33 2200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 1200.00 2933.33 2200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1200.00 2933.33 2200.00 =============== 604-30005 MH Slab Base (5 Ft) Each =================================================== NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 4.00 3200.00 3799.52 3430.56 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 3200.00 3799.52 3430.56 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 2.00 2500.00 3035.00 2719.98 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 257 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-30005 MH Slab Base (5 Ft) Each =================================================== BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 1.00 2600.00 2833.14 4598.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 2533.33 2940.80 3346.15 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 3.00 2465.00 3487.27 4000.00 CC 0821-084 SH82 ASPEN 12/20/07 1.00 3000.00 4780.83 3069.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 2598.75 3745.98 3767.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 2799.55 3545.36 3529.97 =============== 604-30010 MH Slab Base (10 Ft) Each =================================================== NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 1.00 3400.00 3990.00 3300.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 17.00 3800.00 4891.93 5067.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 18.00 3777.78 4811.40 4968.88 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 2.00 2500.00 3495.00 3050.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 2500.00 3495.00 3050.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 3.00 4000.00 5668.00 3900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 4000.00 5668.00 3900.00 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 1.00 3500.00 3874.60 2900.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 13.00 4000.00 4320.71 4000.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 1.00 4500.00 4047.64 2800.00 CC 0821-084 SH82 ASPEN 12/20/07 1.00 4000.00 6163.67 3762.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 16.00 4000.00 4356.24 3841.38 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 39.00 3820.51 4535.65 4325.69 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 258 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-30015 MH Slab Base (15 Ft) Each =================================================== STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 1.00 3800.00 7844.38 6100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 3800.00 7844.38 6100.00 STA 340A-013 SH 340 IN FRUITA 10/25/07 3.00 7200.00 7256.25 6800.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 2.00 5000.00 5509.47 3500.00 CC 0821-084 SH82 ASPEN 12/20/07 1.00 5000.00 7915.83 3619.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 6100.00 6689.46 5169.83 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 5771.43 6825.33 5302.71 =============== 604-31005 MH Box Base (5 Ft) Each =================================================== NH 1601-056 US 160 @ ROOSA AVE 08/23/07 1.00 8000.00 7823.61 5500.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 1.00 3500.00 6759.56 12341.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 5750.00 7114.25 8920.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 5750.00 7114.25 8920.75 =============== 604-31010 MH Box Base (10 Ft) Each =================================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 3.00 3500.00 8044.26 7170.02 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 3500.00 8044.26 7170.02 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 7.00 8500.00 8320.13 13598.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7.00 8500.00 8320.13 13598.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 7000.00 8237.36 11669.61 =============== 604-31015 MH Box Base (15 Ft) Each =================================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 3.00 10000.00 11681.63 16478.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 10000.00 11681.63 16478.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 10000.00 11681.63 16478.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 259 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-31020 MH Box Base (20 Ft) Each =================================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 2.00 15000.00 13757.63 18331.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 15000.00 13757.63 18331.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 15000.00 13757.63 18331.50 =============== 604-39000 MH Spec Each =================================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 2.00 20000.00 28978.63 19452.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 20000.00 28978.63 19452.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 20000.00 28978.63 19452.00 =============== 604-39005 MH Spec (5 Ft) Each =================================================== SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 1.00 5000.00 5700.00 5700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 5000.00 5700.00 5700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5000.00 5700.00 5700.00 =============== 604-39010 MH Spec (10 Ft) Each =================================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 1.00 15000.00 14776.00 15529.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 15000.00 14776.00 15529.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 15000.00 14776.00 15529.00 =============== 604-39015 MH Spec (15 Ft) Each =================================================== BRR500-087 US 160 PAGOSA SPRINGS 07/12/07 1.00 20000.00 27443.00 28886.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 20000.00 27443.00 28886.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 20000.00 27443.00 28886.00 =============== 604-39020 MH Spec (20 Ft) Each =================================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 2.00 18000.00 17876.38 18331.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 18000.00 17876.38 18331.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 18000.00 17876.38 18331.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 260 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-39025 MH Spec (25 Ft) Each =================================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 1.00 15000.00 19170.50 19452.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 15000.00 19170.50 19452.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 15000.00 19170.50 19452.00 =============== 604-39050 MH (TMS) Each =================================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 3.00 13000.00 16646.45 7401.81 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 13000.00 16646.45 7401.81 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 13000.00 16646.45 7401.81 =============== 604-50003 IG and F Ty C Each =================================================== IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 12.00 1900.00 485.33 543.77 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12.00 1900.00 485.33 543.77 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 1900.00 485.33 543.77 =============== 604-50200 MH R and C Each =================================================== IM 0703-319 EJMT 24.9 KV SERVICE 01/25/07 23.00 6500.00 6154.64 4642.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 2.00 380.00 1083.48 1466.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 25.00 6010.40 5748.95 4387.94 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25.00 6010.40 5748.95 4387.94 =============== 605-00040 4 In PP Underdrain Lin Foot =============================================== STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 36.00 51.00 68.33 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 36.00 51.00 68.33 75.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 36.00 51.00 68.33 75.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 261 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 605-00060 6 In PP Underdrain Lin Foot =============================================== C0703-338 CLEAR CREEK COUNTY 12/05/07 30.00 100.00 97.00 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 30.00 100.00 97.00 60.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 100.00 97.00 60.00 =============== 605-00120 12 In PP Underdrain Lin Foot =============================================== IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 260.00 60.00 125.00 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 260.00 60.00 125.00 60.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 260.00 60.00 125.00 60.00 =============== 605-82100 Pipe Edge Drain Lin Foot =============================================== IM 0253-194 ON I-25 IN WELD COUNTY 01/25/07 34,394.00 35.00 11.17 9.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 34,394.00 35.00 11.17 9.50 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 206.00 39.00 72.00 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 206.00 39.00 72.00 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 34,600.00 35.02 11.53 9.74 =============== 605-83002 Geocomp Drain (w/ Pipe) Sq Yard ================================================ BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 181.00 20.00 28.64 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 181.00 20.00 28.64 20.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 181.00 20.00 28.64 20.00 =============== 605-84000 Subsurface Drain Outlet Lin Foot =============================================== IM 0253-194 ON I-25 IN WELD COUNTY 01/25/07 1,611.00 20.00 25.83 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,611.00 20.00 25.83 20.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 262 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 605-84000 Subsurface Drain Outlet Lin Foot =============================================== STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 102.00 15.00 63.33 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 102.00 15.00 63.33 60.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,713.00 19.70 28.07 22.38 =============== 606-00301 Gdrail Ty 3 (6-3) Lin Foot =============================================== STA 0961-012 SH 96, OVERLAY IN PUEBLO 01/04/07 500.00 22.00 20.41 17.70 STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 3,525.00 17.00 16.88 18.25 STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 3,751.00 17.00 16.62 16.00 STA 012A-042 SH 12, S. OF LA VETA 01/18/07 50.00 20.00 28.42 29.00 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 1,325.00 17.00 17.00 16.00 STA 069A-021 SH 69, W. OF WALSENBURG 01/25/07 1,550.00 18.00 16.61 15.00 NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 903.00 17.50 16.70 17.00 SHE 0931-027 SH 93 @ SH 72 01/25/07 170.00 18.00 20.97 25.00 IM 0253-194 ON I-25 IN WELD COUNTY 01/25/07 3,125.00 15.00 15.00 15.00 NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 225.00 20.00 16.50 16.50 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 388.00 25.00 27.65 29.00 NH 1602-102 WITHIN THE ALAMOSA CITY LIMIT 02/15/07 137.00 20.00 25.25 29.00 SHE 1151-020 SH 115 VMS, MP 17 AND MP 41 02/15/07 750.00 20.00 19.26 17.14 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 200.00 20.00 25.40 22.00 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 6,025.00 17.00 17.74 16.00 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 23,066.00 17.00 18.33 18.00 IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 800.00 3.00 12.61 12.40 SHE 0504-050 INTERSECTION OF SH 50B AND SH 03/22/07 1,987.50 18.00 17.93 16.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 48,477.50 16.93 17.73 17.26 SHE 165A-011 ALONG SH 165 N/O RYE 04/05/07 6,100.00 18.00 16.95 17.21 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 2,901.00 16.30 16.49 16.00 NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 3,625.00 17.00 17.81 15.25 NH 0405-025 KIT CARSON BRIDGE 04/26/07 3,167.00 15.93 15.71 17.00 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 3,325.00 20.00 21.87 21.00 SHE 0251-175 ALONG I 25 NORTH OF THE CITY 04/26/07 2,100.00 17.00 14.62 13.05 STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 1,125.00 17.39 22.28 21.40 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 827.00 18.00 17.05 16.70 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 600.00 18.00 16.02 14.50 IM0703-317 FROM MP 221.30 TO MP 251.30 J 05/17/07 200.00 22.15 18.43 20.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 263 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-00301 Gdrail Ty 3 (6-3) Lin Foot =============================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 7,837.00 15.00 14.00 13.48 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 3,708.00 17.00 13.94 14.50 NH 3851-016 US 385 NORTH OF BURLINGTON 05/24/07 3,775.00 17.27 16.30 14.90 SHE 133A-032 SH 133 BETWEEN REDSTONE AND M 05/24/07 8,890.00 20.00 14.45 13.70 NH0341-071 US 34: GARFIELD TO MORNING DR 06/14/07 990.00 17.00 15.50 16.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 1,075.00 18.00 19.07 16.50 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 2,887.50 16.25 16.91 17.18 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 125.00 25.00 25.01 20.30 ITSSW00-378 VMS REPLACEMENT IN REGIONS 1, 06/21/07 550.00 25.00 22.65 17.20 CR600-285 VARIOUS LOCATIONS IN REGION 6 06/28/07 1,243.75 18.00 21.67 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 55,051.25 17.57 16.15 15.73 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 3,275.00 20.00 15.73 14.54 C065A-020 SH65 GRAND MESA SLIDE REPAIR 07/26/07 175.00 18.00 30.00 25.00 BR 0253-192 I-25&128TH 08/16/07 1,568.50 16.00 16.53 16.50 CR100-126 WEST OF KIT CARSON 08/16/07 588.00 18.57 16.54 16.00 C0701-190 26.5 ROAD/I-70 BRIDGE REPAIR 08/27/07 63.00 30.00 33.83 30.00 ITSSW00-455 VMS REPLACEMENT IN REGIONS 1, 08/30/07 295.00 30.00 25.50 27.00 IM R400-215 I-25 & I-76 VMS INSTALLATION 09/06/07 88.00 25.00 36.51 23.50 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 762.50 20.00 17.79 16.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 240.00 18.00 20.63 19.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7,055.00 19.44 16.78 16.44 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 1,500.00 18.00 16.22 6.06 SHE0092-019 SH 9 NORTH OF SILVERTHORNE, I 10/18/07 4,200.00 15.25 16.28 13.80 STA 340A-013 SH 340 IN FRUITA 10/25/07 3,338.00 16.50 18.73 18.00 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 302.00 18.00 18.03 16.15 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 262.50 18.00 18.91 17.00 CC 0821-084 SH82 ASPEN 12/20/07 94.00 25.00 24.00 27.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9,696.50 16.36 17.27 14.34 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 120,280.25 17.32 16.90 16.27 =============== 606-00350 Gdrail Ty 3 (D) (6-3) Lin Foot =============================================== NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 50.00 35.00 21.10 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 50.00 35.00 21.10 20.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 264 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-00350 Gdrail Ty 3 (D) (6-3) Lin Foot =============================================== SHE 0251-175 ALONG I 25 NORTH OF THE CITY 04/26/07 9,475.00 25.00 19.59 18.80 IM0703-317 FROM MP 221.30 TO MP 251.30 J 05/17/07 24,550.00 14.04 22.54 22.50 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 1,637.50 27.15 23.54 22.84 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 35,662.50 17.55 21.52 21.53 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 660.00 22.00 23.39 21.19 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 660.00 22.00 23.39 21.19 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 36,372.50 17.66 21.59 21.52 =============== 606-00705 Gdrail Ty 7 (Spec) Lin Foot =============================================== BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 20.00 100.00 197.51 65.00 CC 0821-084 SH82 ASPEN 12/20/07 40.00 250.00 239.51 227.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 60.00 200.00 225.51 173.03 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 60.00 200.00 225.51 173.03 =============== 606-00710 Gdrail Ty 7 (Sty CA) Lin Foot =============================================== IM 0702-270 I 70 THROUGH GLENWOOD CANYON 01/11/07 200.00 65.00 75.00 75.00 IM0252-388 I-25 LARKSPUR INTERCHANGE NOR 03/08/07 2,480.00 45.00 47.16 46.20 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 500.00 75.00 75.67 70.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,180.00 50.97 52.11 51.75 SHE 0251-175 ALONG I 25 NORTH OF THE CITY 04/26/07 50.00 100.00 165.76 111.00 IM0703-317 FROM MP 221.30 TO MP 251.30 J 05/17/07 70.00 106.27 208.33 200.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 240.00 45.00 67.17 83.19 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 2,565.00 55.00 53.33 50.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,925.00 56.18 57.15 57.79 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 265 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-00710 Gdrail Ty 7 (Sty CA) Lin Foot =============================================== HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 1,310.00 70.00 71.00 71.30 C0702-273 I-70 GLENWOOD CANYON 08/09/07 383.00 80.00 150.00 150.00 BR 0253-192 I-25&128TH 08/16/07 1,414.00 40.00 49.79 52.00 C0701-190 26.5 ROAD/I-70 BRIDGE REPAIR 08/27/07 230.00 44.00 93.67 44.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 1,106.00 90.00 80.63 70.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,443.00 64.95 68.33 70.21 C120A-007 ON SH 120 AT PORTLAND OVER TH 11/29/07 240.00 50.00 62.50 65.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 283.00 75.00 79.82 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 523.00 63.53 73.56 70.41 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,071.00 58.55 61.37 61.64 =============== 606-00715 Gdrail Ty 7 (Sty CA)(Conc Glare Screen) Lin Foot =============================================== IM 0702-269 I 70 IN EAGLE COUNTY 01/11/07 3,434.00 60.00 87.00 84.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,434.00 60.00 87.00 84.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,434.00 60.00 87.00 84.00 =============== 606-00716 Gdrial Ty 7 (Sty CA) (Spec) Lin Foot =============================================== BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 159.00 85.00 189.65 175.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 159.00 85.00 189.65 175.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 159.00 85.00 189.65 175.00 =============== 606-00720 Gdrail Ty 7 (Sty CC) Lin Foot =============================================== BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 312.00 70.00 59.00 66.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 312.00 70.00 59.00 66.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 312.00 70.00 59.00 66.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 266 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-00730 Gdrail Ty 7 (Sty CD) Lin Foot =============================================== C0702-273 I-70 GLENWOOD CANYON 08/09/07 4,204.00 60.00 85.00 85.00 BR 0253-192 I-25&128TH 08/16/07 76.00 40.00 101.82 190.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,280.00 59.64 86.39 86.86 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 392.00 60.00 83.26 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 392.00 60.00 83.26 65.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,672.00 59.67 85.33 85.03 =============== 606-00740 Gdrail Ty 7 (Sty CE) Lin Foot =============================================== IM0703-317 FROM MP 221.30 TO MP 251.30 J 05/17/07 20.00 134.34 525.00 650.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20.00 134.34 525.00 650.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 134.34 525.00 650.00 =============== 606-01320 End Anchor Ty 3B Each =================================================== IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 1.00 875.00 795.13 924.41 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 875.00 795.13 924.41 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 1.00 900.00 1026.89 1029.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 900.00 1026.89 1029.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 887.50 921.55 976.71 =============== 606-01340 End Anchor Ty 3D Each =================================================== NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 3.00 800.00 695.00 650.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 267 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-01340 End Anchor Ty 3D Each =================================================== SHE 0931-027 SH 93 @ SH 72 01/25/07 1.00 600.00 843.30 770.00 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 2.00 700.00 832.89 730.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 733.33 782.48 696.67 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 2.00 654.32 659.77 670.00 SHE 0251-175 ALONG I 25 NORTH OF THE CITY 04/26/07 1.00 675.00 597.96 572.00 IM0703-317 FROM MP 221.30 TO MP 251.30 J 05/17/07 1.00 849.42 688.33 700.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 10.00 550.00 590.32 581.26 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 1.00 1000.00 623.78 646.00 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 3.00 613.66 804.13 870.04 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 3.00 750.00 797.00 725.00 ITSSW00-378 VMS REPLACEMENT IN REGIONS 1, 06/21/07 2.00 800.00 951.47 799.40 CR600-285 VARIOUS LOCATIONS IN REGION 6 06/28/07 3.00 1000.00 722.00 700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 26.00 693.23 682.52 675.17 BR 0253-192 I-25&128TH 08/16/07 2.00 800.00 697.65 650.00 ITSSW00-455 VMS REPLACEMENT IN REGIONS 1, 08/30/07 4.00 800.00 1061.00 1100.00 IM R400-215 I-25 & I-76 VMS INSTALLATION 09/06/07 2.00 900.00 983.80 752.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 825.00 903.66 900.50 STA 340A-013 SH 340 IN FRUITA 10/25/07 3.00 665.00 671.25 600.00 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 2.00 700.00 728.70 857.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 679.00 702.18 703.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 45.00 720.42 735.50 721.20 =============== 606-01370 Transition Ty 3G Each =================================================== STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 12.00 1100.00 811.80 1000.00 IM 0702-269 I 70 IN EAGLE COUNTY 01/11/07 8.00 1300.00 1100.00 1000.00 STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 8.00 1100.00 1260.00 1200.00 BR 109A-018 SH 109 LA JUNTA, SH50, MANZI 01/11/07 2.00 2100.00 2047.00 2194.00 STA 069A-021 SH 69, W. OF WALSENBURG 01/25/07 14.00 1100.00 1199.25 1050.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 268 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-01370 Transition Ty 3G Each =================================================== NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 4.00 1250.00 1066.38 1100.00 IM 0253-194 ON I-25 IN WELD COUNTY 01/25/07 6.00 1100.00 1066.67 1000.00 NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 2.00 1100.00 1148.00 1148.00 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 8.00 1100.00 1124.67 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 64.00 1165.63 1100.04 1096.63 NH 0405-025 KIT CARSON BRIDGE 04/26/07 4.00 996.61 1156.68 1200.00 SHE 0251-175 ALONG I 25 NORTH OF THE CITY 04/26/07 11.00 1050.00 1084.84 1437.00 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 8.00 1100.00 1094.32 983.00 IM0703-317 FROM MP 221.30 TO MP 251.30 J 05/17/07 3.00 1103.78 1258.33 1300.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 12.00 1000.00 996.94 992.75 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 2.00 1150.00 1127.19 1200.50 NH 3851-016 US 385 NORTH OF BURLINGTON 05/24/07 4.00 1024.83 1176.67 1130.00 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 2.00 1500.00 2175.00 1750.00 NH0341-071 US 34: GARFIELD TO MORNING DR 06/14/07 1.00 1100.00 1566.67 1600.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 4.00 1100.00 1129.03 1100.00 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 4.00 1200.00 1500.07 1748.38 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 55.00 1079.04 1159.07 1230.88 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 4.00 1200.00 1983.26 1586.55 BR 0253-192 I-25&128TH 08/16/07 2.00 1200.00 1149.98 1165.00 C0701-190 26.5 ROAD/I-70 BRIDGE REPAIR 08/27/07 1.00 1100.00 1240.50 1100.00 C0701-187 I-70 20 ROAD BRIDGE REPAIR 09/06/07 4.00 1200.00 1726.80 1700.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 2.00 850.00 1455.63 1300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 13.00 1138.46 1710.50 1475.09 STA 340A-013 SH 340 IN FRUITA 10/25/07 2.00 1075.00 1291.25 1200.00 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 2.00 1100.00 1174.65 1110.16 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 4.00 1200.00 1270.21 1100.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 2.00 1200.00 1473.78 1387.00 CC 0821-084 SH82 ASPEN 12/20/07 5.00 630.00 1315.08 1325.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 15.00 980.00 1299.98 1228.12 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 147.00 1111.89 1213.75 1193.75 =============== 606-01380 Transition Ty 3H Each =================================================== BR 109A-018 SH 109 LA JUNTA, SH50, MANZI 01/11/07 2.00 1000.00 962.63 925.25 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 269 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-01380 Transition Ty 3H Each =================================================== NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 4.00 800.00 600.03 650.00 IM 0253-194 ON I-25 IN WELD COUNTY 01/25/07 4.00 750.00 553.33 510.00 NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 2.00 800.00 756.00 756.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12.00 816.67 640.10 666.88 IM0703-317 FROM MP 221.30 TO MP 251.30 J 05/17/07 1.00 611.40 796.67 850.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 3.00 620.00 627.75 580.99 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 2.00 1000.00 596.07 636.50 NH0341-071 US 34: GARFIELD TO MORNING DR 06/14/07 1.00 700.00 730.00 750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7.00 738.77 639.31 659.42 STA 340A-013 SH 340 IN FRUITA 10/25/07 2.00 675.00 655.00 600.00 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 1.00 700.00 657.86 756.93 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 683.33 656.33 652.31 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 22.00 773.70 642.93 662.52 =============== 606-01385 Transition Ty 3J Each =================================================== STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 1.00 800.00 711.20 600.00 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 1.00 700.00 860.17 685.00 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 3.00 1000.00 668.00 625.00 SHE 0504-050 INTERSECTION OF SH 50B AND SH 03/22/07 3.00 840.00 917.37 939.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 877.50 792.63 747.41 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 4.00 1500.00 550.33 525.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 2.00 650.00 705.76 683.03 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 3.00 1000.00 1493.00 1350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 9.00 1144.44 885.76 835.12 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 2.00 800.00 771.24 530.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 270 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-01385 Transition Ty 3J Each =================================================== CC 0821-084 SH82 ASPEN 12/20/07 1.00 790.00 838.35 1035.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 796.67 793.61 698.37 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 985.50 821.55 779.52 =============== 606-01390 End Anchor Ty 3K Each =================================================== STA 0961-012 SH 96, OVERLAY IN PUEBLO 01/04/07 1.00 1200.00 1368.76 1100.00 STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 1.00 1200.00 1071.60 1125.00 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 2.00 1000.00 1156.83 1100.00 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 3.00 1100.00 1091.67 1400.00 SHE 0504-050 INTERSECTION OF SH 50B AND SH 03/22/07 1.00 1200.00 998.31 976.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 1112.50 1124.43 1200.19 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 4.00 1400.00 1601.67 1500.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 2.00 900.00 934.51 863.03 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 1233.33 1334.80 1287.68 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 2.00 1200.00 1166.62 950.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 4.00 1200.00 1074.71 986.00 CC 0821-084 SH82 ASPEN 12/20/07 1.00 1075.00 1073.97 976.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 7.00 1182.14 1100.86 974.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21.00 1170.24 1154.22 1149.92 =============== 606-01395 Transition Ty 3L Each =================================================== STA 0961-012 SH 96, OVERLAY IN PUEBLO 01/04/07 1.00 1200.00 1084.40 2500.00 STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 2.00 750.00 664.50 575.00 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 8.00 650.00 644.17 645.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11.00 718.18 681.78 800.91 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 4.00 1500.00 552.23 543.90 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 271 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-01395 Transition Ty 3L Each =================================================== STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 8.00 605.00 520.00 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12.00 903.33 536.11 514.63 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 23.00 814.78 633.73 651.55 =============== 606-01460 Median Terminal Each =================================================== NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 4.00 4200.00 3746.00 3500.00 NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 2.00 4500.00 4039.45 4180.00 IM 0253-194 ON I-25 IN WELD COUNTY 01/25/07 2.00 4000.00 4166.67 4200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 4225.00 3879.90 3845.00 SHE 0251-175 ALONG I 25 NORTH OF THE CITY 04/26/07 5.00 4250.00 3761.52 3457.00 IM0703-317 FROM MP 221.30 TO MP 251.30 J 05/17/07 8.00 3310.38 3850.00 4000.00 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 2.00 3930.00 3816.57 3915.16 CR600-285 VARIOUS LOCATIONS IN REGION 6 06/28/07 2.00 4000.00 4041.67 4000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 17.00 3740.77 3828.52 3830.31 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 2.00 4000.00 4172.16 3936.03 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 4000.00 4172.16 3936.03 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 27.00 3903.45 3886.67 3842.50 =============== 606-02003 End Anchor (Nonflared) Each =================================================== STA 0961-012 SH 96, OVERLAY IN PUEBLO 01/04/07 1.00 2200.00 1935.40 1100.00 STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 19.00 2200.00 1914.00 1850.00 STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 10.00 2000.00 1988.00 2000.00 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 1.00 2500.00 2086.00 2000.00 STA 069A-021 SH 69, W. OF WALSENBURG 01/25/07 4.00 2300.00 1938.25 2100.00 NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 2.00 2250.00 1771.13 1700.00 IM 0253-194 ON I-25 IN WELD COUNTY 01/25/07 4.00 2500.00 2066.67 2000.00 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 2.00 2200.00 2201.13 2250.00 STA 1251-005 SH 125 AND 127 NORTH OF COWDR 02/08/07 6.00 2200.00 2365.00 2300.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 272 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-02003 End Anchor (Nonflared) Each =================================================== NH 1602-102 WITHIN THE ALAMOSA CITY LIMIT 02/15/07 2.00 2100.00 2825.00 3150.00 SHE 1151-020 SH 115 VMS, MP 17 AND MP 41 02/15/07 3.00 2200.00 2528.22 2195.50 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 2.00 2250.00 2467.24 2400.00 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 25.00 2000.00 2038.33 2950.00 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 4.00 2300.00 2550.00 1850.00 SHE 0504-050 INTERSECTION OF SH 50B AND SH 03/22/07 2.00 2250.00 2088.76 2037.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 87.00 2147.13 2088.07 2290.35 SHE 165A-011 ALONG SH 165 N/O RYE 04/05/07 28.00 2000.00 1852.31 1725.00 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 11.00 2000.00 2179.00 2100.00 SHE 0251-175 ALONG I 25 NORTH OF THE CITY 04/26/07 4.00 2000.00 1937.28 1848.00 STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 5.00 2129.34 2170.00 2150.00 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 4.00 2000.00 1933.75 1925.00 STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 8.00 2017.90 2020.50 1941.00 NH 3851-016 US 385 NORTH OF BURLINGTON 05/24/07 13.00 2011.02 1833.33 1800.00 SHE 133A-032 SH 133 BETWEEN REDSTONE AND M 05/24/07 13.00 2100.00 1896.70 1894.80 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 1.00 1500.00 2750.00 2600.00 NH0341-071 US 34: GARFIELD TO MORNING DR 06/14/07 4.00 1700.00 1933.33 1950.00 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 2.00 2031.69 1878.50 1903.20 CR600-285 VARIOUS LOCATIONS IN REGION 6 06/28/07 4.00 2250.00 2243.33 2300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 97.00 2016.46 1948.89 1899.06 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 10.00 2100.00 2022.15 1808.10 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 3.00 2200.00 2193.17 2090.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 13.00 2123.08 2039.44 1873.15 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 4.00 2200.00 2207.25 1964.00 SHE0092-019 SH 9 NORTH OF SILVERTHORNE, I 10/18/07 4.00 2168.75 2148.13 1859.65 CC 0821-084 SH82 ASPEN 12/20/07 3.00 2300.00 2196.40 2138.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 11.00 2215.91 2181.74 1973.62 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 208.00 2088.32 2037.97 2065.05 =============== 606-02005 End Anchor (Flared) Each =================================================== STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 10.00 1900.00 1593.00 1600.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 273 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-02005 End Anchor (Flared) Each =================================================== STA 012A-042 SH 12, S. OF LA VETA 01/18/07 2.00 1800.00 2251.67 1990.00 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 2.00 1700.00 1649.00 1500.00 STA 069A-021 SH 69, W. OF WALSENBURG 01/25/07 16.00 2000.00 1544.25 1540.00 SHE 0931-027 SH 93 @ SH 72 01/25/07 1.00 1800.00 2266.70 1950.00 IM 0253-194 ON I-25 IN WELD COUNTY 01/25/07 6.00 1550.00 1566.67 1500.00 NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 4.00 1750.00 1643.00 1643.00 NH 0402-070 US 40 ROUTT COUNTY 02/08/07 12.00 2000.00 1707.50 1715.00 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 6.00 1800.00 2266.67 1500.00 IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 3.00 1500.00 1912.23 2625.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 62.00 1861.29 1717.72 1654.79 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 4.00 1753.94 1544.28 1500.00 NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 32.00 1800.00 2175.00 1500.00 NH 0405-025 KIT CARSON BRIDGE 04/26/07 4.00 1409.00 1590.09 1600.00 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 1.00 2100.00 2186.67 1750.00 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 8.00 1500.00 1574.11 1445.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 23.00 1400.00 1411.77 1362.07 NH 3851-016 US 385 NORTH OF BURLINGTON 05/24/07 1.00 1892.72 1916.67 1550.00 SHE 133A-032 SH 133 BETWEEN REDSTONE AND M 05/24/07 23.00 2000.00 1425.36 1339.60 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 1.00 2600.00 3000.00 2000.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 4.00 1600.00 1556.02 1500.00 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 1.00 1616.91 1693.76 1794.45 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 4.00 2400.00 1822.44 1637.10 ITSSW00-378 VMS REPLACEMENT IN REGIONS 1, 06/21/07 2.00 2500.00 2209.05 1697.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 108.00 1756.12 1712.23 1454.96 C065A-020 SH65 GRAND MESA SLIDE REPAIR 07/26/07 2.00 3000.00 2033.33 2100.00 BR 0253-192 I-25&128TH 08/16/07 3.00 2000.00 1573.42 1575.00 CR100-126 WEST OF KIT CARSON 08/16/07 4.00 1724.80 1735.24 1500.00 C0701-190 26.5 ROAD/I-70 BRIDGE REPAIR 08/27/07 1.00 1800.00 1542.50 1800.00 IM R400-215 I-25 & I-76 VMS INSTALLATION 09/06/07 1.00 2500.00 2180.40 1772.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 3.00 1300.00 1747.63 1600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 14.00 1935.66 1755.55 1664.07 SHE0092-019 SH 9 NORTH OF SILVERTHORNE, I 10/18/07 4.00 1742.75 1756.84 1309.20 STA 340A-013 SH 340 IN FRUITA 10/25/07 3.00 2000.00 1465.00 1400.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 274 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-02005 End Anchor (Flared) Each =================================================== BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 1.00 1500.00 1554.85 1513.86 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 2.00 1900.00 1700.96 1400.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 1.00 1750.00 1642.28 1560.00 CC 0821-084 SH82 ASPEN 12/20/07 1.00 2300.00 1643.52 1618.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 12.00 1860.08 1646.46 1410.73 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 196.00 1808.58 1711.75 1530.40 =============== 606-10300 Brdg Rail Ty 3 Lin Foot =============================================== STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 174.40 120.00 154.00 161.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 174.40 120.00 154.00 161.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 174.40 120.00 154.00 161.00 =============== 606-10305 Brdg Rail Ty 3 (Spec) Lin Foot =============================================== C120A-007 ON SH 120 AT PORTLAND OVER TH 11/29/07 360.00 50.00 56.55 39.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 360.00 50.00 56.55 39.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 360.00 50.00 56.55 39.00 =============== 606-10350 Brdg Rail Ty 3R Lin Foot =============================================== STA 0961-012 SH 96, OVERLAY IN PUEBLO 01/04/07 34.00 120.00 47.35 35.75 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 811.00 125.00 125.25 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 845.00 124.80 122.62 116.61 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 845.00 124.80 122.62 116.61 =============== 606-10700 Brdg Rail Ty 7 Lin Foot =============================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 2,302.00 70.00 68.83 84.83 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 675.00 60.00 75.26 74.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,977.00 67.73 70.80 82.37 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 275 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-10700 Brdg Rail Ty 7 Lin Foot =============================================== BR 0253-192 I-25&128TH 08/16/07 621.00 75.00 91.56 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 621.00 75.00 91.56 90.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,598.00 68.99 74.74 83.69 =============== 606-10705 Brdg Rail Ty 7 (Spec) Lin Foot =============================================== NH 0405-025 KIT CARSON BRIDGE 04/26/07 741.00 88.95 132.54 130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 741.00 88.95 132.54 130.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 4,893.00 100.00 96.75 98.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,893.00 100.00 96.75 98.50 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 338.00 130.00 128.50 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 338.00 130.00 128.50 100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,972.00 100.33 108.28 102.49 =============== 606-11010 Brdg Rail Ty 10R Lin Foot =============================================== STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 1,670.00 125.00 94.76 95.00 STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 283.00 140.00 124.33 120.00 STA 069A-021 SH 69, W. OF WALSENBURG 01/25/07 526.00 150.00 105.00 106.00 NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 128.00 200.00 106.45 110.00 IM 0253-194 ON I-25 IN WELD COUNTY 01/25/07 364.00 110.00 100.33 96.00 NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 277.00 125.00 94.60 94.60 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 682.00 150.00 97.63 95.00 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 49.00 145.00 155.33 156.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,979.00 134.94 100.43 99.53 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 276 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-11010 Brdg Rail Ty 10R Lin Foot =============================================== SHE 0251-175 ALONG I 25 NORTH OF THE CITY 04/26/07 472.00 120.00 111.71 107.10 NH 3851-016 US 385 NORTH OF BURLINGTON 05/24/07 200.00 144.47 107.00 106.00 NH0341-071 US 34: GARFIELD TO MORNING DR 06/14/07 43.00 120.00 132.00 136.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 715.00 126.84 111.64 108.53 STA 340A-013 SH 340 IN FRUITA 10/25/07 438.00 120.00 111.75 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 438.00 120.00 111.75 110.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,132.00 132.54 102.80 101.68 =============== 606-11030 Brdg Rail Ty 10M Lin Foot =============================================== BR 109A-018 SH 109 LA JUNTA, SH50, MANZI 01/11/07 383.00 150.00 138.50 127.00 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 92.00 170.00 96.17 95.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 475.00 153.87 120.77 120.80 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 1,228.00 105.00 118.90 102.00 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 128.00 125.00 116.24 84.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,356.00 106.89 118.61 100.37 C0701-187 I-70 20 ROAD BRIDGE REPAIR 09/06/07 434.00 150.00 146.80 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 434.00 150.00 146.80 140.00 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 643.00 115.00 117.60 90.00 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 446.00 110.00 155.89 98.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,089.00 112.95 131.88 93.28 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,354.00 121.09 127.02 106.09 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 277 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-11032 Brdg Rail Ty 10M (Spec) Lin Foot =============================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 782.00 125.00 109.34 71.34 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 782.00 125.00 109.34 71.34 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 708.00 250.00 191.25 190.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 708.00 250.00 191.25 190.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,490.00 184.40 148.26 127.72 =============== 606-20010 Tensioned Cable Barrier Lin Foot =============================================== SHE 0251-175 ALONG I 25 NORTH OF THE CITY 04/26/07 11,165.00 19.00 13.56 10.15 SHE0761-193 I-76: SHERIDAN TO I-25 (M.P. 05/17/07 10,470.00 13.00 13.16 10.90 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 17,045.00 21.00 11.12 10.49 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 38,680.00 18.26 12.50 10.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 38,680.00 18.26 12.50 10.50 =============== 606-21010 End Anchor (Tens Cab Bar) Each =================================================== SHE 0251-175 ALONG I 25 NORTH OF THE CITY 04/26/07 8.00 3000.00 2667.74 2063.00 SHE0761-193 I-76: SHERIDAN TO I-25 (M.P. 05/17/07 18.00 2500.00 2887.27 2394.75 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 12.00 4000.00 2634.98 2359.91 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 38.00 3078.95 2769.90 2313.91 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 38.00 3078.95 2769.90 2313.91 =============== 607-00000 Line Post Each =================================================== SHE 0702-267 NEAR VAIL IN EAGLE COUNTY 08/02/07 48.00 49.00 79.34 70.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 48.00 49.00 79.34 70.00 C 0504-055 PUEBLO COUNTY, US-50C AT SALT 11/01/07 38.00 80.00 55.33 86.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 38.00 80.00 55.33 86.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 86.00 62.70 71.61 77.07 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 278 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-00005 End Post Each =================================================== NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 50.00 125.00 105.50 105.50 STA 0661-009 ON SH 66 IN WELD COUNTY 02/01/07 7.00 125.00 182.77 154.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 57.00 125.00 150.57 111.46 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 13.00 188.06 157.40 160.00 NH 0405-025 KIT CARSON BRIDGE 04/26/07 12.00 212.51 131.53 110.00 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 3.00 150.00 149.50 155.50 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 45.00 150.00 128.23 127.92 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 1.00 200.00 261.99 250.41 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 74.00 167.50 140.24 133.42 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 5.00 155.00 228.64 175.00 SHE 0702-267 NEAR VAIL IN EAGLE COUNTY 08/02/07 32.00 185.00 390.20 187.00 CR100-126 WEST OF KIT CARSON 08/16/07 17.00 151.31 99.01 100.00 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 8.00 165.00 344.33 355.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 62.00 170.76 300.16 183.85 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 3.00 130.00 236.53 181.11 C 0504-055 PUEBLO COUNTY, US-50C AT SALT 11/01/07 2.00 170.00 163.33 190.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 2.00 165.50 289.20 375.00 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 2.00 150.00 197.25 184.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9.00 151.22 233.48 226.84 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 202.00 155.78 203.63 146.87 =============== 607-00010 Corner and Line Br Post Each =================================================== NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 124.00 100.00 122.10 122.10 STA 0661-009 ON SH 66 IN WELD COUNTY 02/01/07 3.00 200.00 208.58 187.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 127.00 102.36 138.95 123.63 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 279 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-00010 Corner and Line Br Post Each =================================================== HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 28.00 174.99 181.20 180.00 NH 0405-025 KIT CARSON BRIDGE 04/26/07 4.00 205.72 138.25 110.00 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 42.00 190.00 167.86 175.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 65.00 175.00 156.81 172.22 STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 30.00 175.00 165.00 150.00 BR 059A-032 ON SH 59 IN SEDGWICK COUNTY 06/07/07 4.00 150.00 327.06 350.00 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 2.00 200.00 298.68 268.49 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 175.00 179.01 173.84 174.06 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 22.00 200.00 199.17 190.00 SHE 0702-267 NEAR VAIL IN EAGLE COUNTY 08/02/07 280.00 295.00 600.35 300.00 CR100-126 WEST OF KIT CARSON 08/16/07 50.00 134.85 124.77 100.00 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 14.00 165.00 382.33 415.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 366.00 262.44 515.64 270.46 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 6.00 160.00 275.56 222.22 C 0504-055 PUEBLO COUNTY, US-50C AT SALT 11/01/07 1.00 250.00 231.67 290.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 2.00 257.00 291.97 310.00 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 4.00 300.00 211.99 199.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 13.00 224.92 252.33 234.02 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 681.00 210.43 378.50 217.61 =============== 607-00015 End Post (Spec) Each =================================================== SHE 5502-054 02/22/07 4.00 500.00 475.44 550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 500.00 475.44 550.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 500.00 475.44 550.00 =============== 607-00020 Corner and Line Br Post (Spec) Each =================================================== SHE 5502-054 02/22/07 10.00 750.00 846.27 880.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 750.00 846.27 880.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 750.00 846.27 880.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 280 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-01000 Fence BW MP Lin Foot =============================================== NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 70,552.00 1.15 0.85 0.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 70,552.00 1.15 0.85 0.85 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 12,573.00 1.13 1.20 1.00 NH 0405-025 KIT CARSON BRIDGE 04/26/07 3,286.00 1.37 1.31 1.20 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 12,883.00 1.70 1.36 1.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 44,070.00 1.60 1.10 1.00 BR 059A-032 ON SH 59 IN SEDGWICK COUNTY 06/07/07 161.00 5.00 3.84 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 72,973.00 1.53 1.20 1.02 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 3,956.00 2.00 1.77 1.70 BR 0253-192 I-25&128TH 08/16/07 346.00 2.00 5.62 7.65 CR100-126 WEST OF KIT CARSON 08/16/07 39,239.00 0.89 0.97 0.90 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 1,076.00 3.00 5.02 5.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 44,617.00 1.05 1.18 1.14 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 945.00 2.00 3.15 2.61 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 200.00 2.00 3.34 3.07 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,145.00 2.00 3.20 2.69 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 189,287.00 1.28 1.17 0.99 =============== 607-01010 Fence BW MP (Spec) Lin Foot =============================================== BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 445.00 2.00 3.87 3.62 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 445.00 2.00 3.87 3.62 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 445.00 2.00 3.87 3.62 =============== 607-01050 Fence Wire MP Lin Foot =============================================== STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 654.00 2.25 1.80 1.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 654.00 2.25 1.80 1.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 654.00 2.25 1.80 1.75 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 281 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-01100 Fence BW TWP Lin Foot =============================================== STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 994.00 2.50 3.42 3.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 994.00 2.50 3.42 3.20 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 662.00 4.50 4.41 2.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 662.00 4.50 4.41 2.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,656.00 3.30 3.89 3.02 =============== 607-11200 Fence CW MP Lin Foot =============================================== STA 0661-009 ON SH 66 IN WELD COUNTY 02/01/07 685.00 3.25 3.91 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 685.00 3.25 3.91 4.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 685.00 3.25 3.91 4.00 =============== 607-11350 Fence Deer Lin Foot =============================================== SHE 5502-054 02/22/07 1,612.00 10.00 15.92 11.91 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,612.00 10.00 15.92 11.91 SHE 0702-267 NEAR VAIL IN EAGLE COUNTY 08/02/07 108,780.00 6.25 10.95 6.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 108,780.00 6.25 10.95 6.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 110,392.00 6.30 11.04 6.23 =============== 607-11525 Fence (Plastic) Lin Foot =============================================== NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 200.00 2.50 3.54 3.30 NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 580.00 3.00 1.28 2.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 282 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-11525 Fence (Plastic) Lin Foot =============================================== SHE 0931-027 SH 93 @ SH 72 01/25/07 100.00 6.00 3.67 3.00 IM 0253-194 ON I-25 IN WELD COUNTY 01/25/07 1,000.00 3.50 5.33 6.00 STA 0661-009 ON SH 66 IN WELD COUNTY 02/01/07 940.00 4.00 2.84 3.50 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 120.00 6.00 4.42 5.00 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 75.00 6.00 8.20 2.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,015.00 3.74 3.42 4.15 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 1,310.00 3.60 2.28 2.25 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 464.00 2.50 4.50 5.00 STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 565.00 5.31 4.86 5.00 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 750.00 2.50 2.44 2.50 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 5,278.00 1.75 1.89 1.96 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 335.00 4.00 3.09 4.00 BR 059A-032 ON SH 59 IN SEDGWICK COUNTY 06/07/07 100.00 5.00 3.31 5.00 IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 400.00 3.00 6.50 5.00 NH0341-071 US 34: GARFIELD TO MORNING DR 06/14/07 300.00 3.00 3.33 3.00 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 100.00 5.00 5.81 2.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 100.00 3.00 4.64 2.00 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 500.00 4.00 3.93 3.74 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10,202.00 2.62 2.65 2.68 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 5,575.00 3.00 3.31 2.28 BRR500-087 US 160 PAGOSA SPRINGS 07/12/07 200.00 10.00 6.75 4.50 C065A-020 SH65 GRAND MESA SLIDE REPAIR 07/26/07 180.00 5.00 5.00 4.00 SHE 0702-267 NEAR VAIL IN EAGLE COUNTY 08/02/07 2,000.00 3.95 3.25 4.50 NH 5502-055 COALBANK PASS 08/09/07 200.00 10.00 9.75 12.50 BR 0253-192 I-25&128TH 08/16/07 200.00 3.00 3.27 2.65 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 500.00 6.00 5.35 6.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 2,500.00 4.00 2.65 2.00 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 800.00 3.50 3.94 3.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12,155.00 3.78 3.33 3.06 STA 340A-013 SH 340 IN FRUITA 10/25/07 200.00 3.25 4.59 5.00 C 0504-055 PUEBLO COUNTY, US-50C AT SALT 11/01/07 200.00 5.00 8.33 7.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 1,600.00 4.00 2.67 1.25 BR 0241-047 US 24, 2 MI S OF GRANITE, CHA 11/15/07 100.00 6.00 3.87 4.17 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 283 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-11525 Fence (Plastic) Lin Foot =============================================== BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 330.00 3.50 3.44 3.18 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 600.00 3.00 4.48 4.30 STSR400-229 SH 14, SH 93, & SH 157 IN BOU 12/06/07 80.00 5.00 7.26 4.25 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 100.00 3.00 8.63 15.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,210.00 3.83 3.56 3.21 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 28,582.00 3.37 3.16 3.05 =============== 607-11575 Rock Fall Fence Lin Foot =============================================== IM0703-323 GEORGETOWN HILL CHUTE 2 AND 3 08/30/07 120.00 1248.36 1250.14 1105.54 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 120.00 1248.36 1250.14 1105.54 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 120.00 1248.36 1250.14 1105.54 =============== 607-11580 Fence (Temp) Lin Foot =============================================== STA 012A-042 SH 12, S. OF LA VETA 01/18/07 300.00 4.00 4.57 6.40 SHE 0931-027 SH 93 @ SH 72 01/25/07 200.00 3.00 4.34 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 500.00 3.60 4.49 6.24 NH 0405-025 KIT CARSON BRIDGE 04/26/07 500.00 3.75 2.00 1.60 STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 2,570.00 3.00 1.88 1.75 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 470.00 4.00 4.21 3.96 ITSSW00-378 VMS REPLACEMENT IN REGIONS 1, 06/21/07 500.00 5.00 7.28 8.85 CR600-285 VARIOUS LOCATIONS IN REGION 6 06/28/07 380.00 3.00 5.17 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4,420.00 3.42 2.72 3.48 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 600.00 4.00 4.00 4.00 ITS SW00-457 DRCOG REGION 08/09/07 400.00 3.50 3.23 4.20 CR100-126 WEST OF KIT CARSON 08/16/07 500.00 3.10 1.48 0.90 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 500.00 5.00 1.85 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,000.00 3.93 2.72 2.77 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 284 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-11580 Fence (Temp) Lin Foot =============================================== C 0504-055 PUEBLO COUNTY, US-50C AT SALT 11/01/07 450.00 8.00 12.33 16.00 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 300.00 3.50 3.86 3.59 CC 0821-084 SH82 ASPEN 12/20/07 2,705.00 4.35 4.99 1.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,455.00 4.75 5.37 3.53 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10,375.00 3.97 3.79 3.49 =============== 607-13000 Fence Msnry (Sound) Sq Foot ================================================ STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 3,300.00 30.00 33.17 32.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,300.00 30.00 33.17 32.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,300.00 30.00 33.17 32.50 =============== 607-15000 Fence Conc (Sound) Sq Foot ================================================ STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 3,016.00 61.00 91.36 103.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,016.00 61.00 91.36 103.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,016.00 61.00 91.36 103.50 =============== 607-21300 Fence Barrier MP Lin Foot =============================================== NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 600.00 6.00 4.28 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 600.00 6.00 4.28 4.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 600.00 6.00 4.28 4.00 =============== 607-32000 Fence Picket Snow Lin Foot =============================================== BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 360.00 8.00 5.26 6.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 360.00 8.00 5.26 6.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 360.00 8.00 5.26 6.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 285 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-52900 Line Post (CL) Each =================================================== STA 340A-013 SH 340 IN FRUITA 10/25/07 214.00 46.00 54.89 53.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 214.00 46.00 54.89 53.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 214.00 46.00 54.89 53.00 =============== 607-52905 End Post (CL) Each =================================================== IM0252-388 I-25 LARKSPUR INTERCHANGE NOR 03/08/07 4.00 250.00 170.14 104.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 250.00 170.14 104.05 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 2.00 233.32 265.10 275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 233.32 265.10 275.00 STA 340A-013 SH 340 IN FRUITA 10/25/07 8.00 175.00 166.25 145.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8.00 175.00 166.25 145.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 204.76 189.57 151.87 =============== 607-52910 Corner and Line Br Post (CL) Each =================================================== IM0252-388 I-25 LARKSPUR INTERCHANGE NOR 03/08/07 2.00 250.00 192.72 115.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 250.00 192.72 115.00 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 1.00 57.70 192.52 190.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 57.70 192.52 190.00 STA 340A-013 SH 340 IN FRUITA 10/25/07 2.00 140.00 213.75 185.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 140.00 213.75 185.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 167.54 199.97 158.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 286 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-53005 Fence CL (Spec) Lin Foot =============================================== BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 275.00 50.00 34.11 21.82 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 275.00 50.00 34.11 21.82 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 275.00 50.00 34.11 21.82 =============== 607-53137 Fence CL (Spec) (36 In) Lin Foot =============================================== BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 200.00 27.00 29.33 34.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 200.00 27.00 29.33 34.50 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 1,057.00 25.00 29.35 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,057.00 25.00 29.35 30.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,257.00 25.32 29.34 30.72 =============== 607-53142 Fence CL (42 In) Lin Foot =============================================== STA 340A-013 SH 340 IN FRUITA 10/25/07 710.00 15.00 7.61 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 710.00 15.00 7.61 6.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 710.00 15.00 7.61 6.00 =============== 607-53160 Fence CL (60 In) Lin Foot =============================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 351.00 20.00 14.79 12.64 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 351.00 20.00 14.79 12.64 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 50.00 48.00 48.88 53.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 50.00 48.00 48.88 53.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 401.00 23.49 19.04 17.67 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 287 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-53161 Fence CL (Spec) (60 In) Lin Foot =============================================== HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 450.00 24.83 24.73 22.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 187.40 50.00 54.67 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 637.40 32.23 29.26 30.23 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 637.40 32.23 29.26 30.23 =============== 607-53172 Fence CL (72 In) Lin Foot =============================================== IM0252-388 I-25 LARKSPUR INTERCHANGE NOR 03/08/07 655.00 11.00 14.03 16.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 655.00 11.00 14.03 16.20 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 353.00 30.00 23.01 23.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 353.00 30.00 23.01 23.50 STA 340A-013 SH 340 IN FRUITA 10/25/07 1,515.00 16.50 7.75 7.00 C 0504-055 PUEBLO COUNTY, US-50C AT SALT 11/01/07 405.00 18.00 14.00 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,920.00 16.82 8.79 8.27 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,928.00 17.10 11.78 11.88 =============== 607-53178 Fence CL (Spec) (78 In) Lin Foot =============================================== NH 0405-025 KIT CARSON BRIDGE 04/26/07 314.00 30.32 41.71 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 314.00 30.32 41.71 40.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 1,200.00 40.00 29.35 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,200.00 40.00 29.35 30.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,514.00 37.99 33.59 32.07 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 288 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-53191 Fence CL (Spec) (92 In) Lin Foot =============================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 700.00 35.00 72.92 88.69 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 700.00 35.00 72.92 88.69 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 700.00 35.00 72.92 88.69 =============== 607-53203 Fence CL (Spec)(102 In) Lin Foot =============================================== IM0252-388 I-25 LARKSPUR INTERCHANGE NOR 03/08/07 50.00 75.00 61.83 71.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 50.00 75.00 61.83 71.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 75.00 61.83 71.25 =============== 607-55030 Mesh Post Each =================================================== IM0703-323 GEORGETOWN HILL CHUTE 2 AND 3 08/30/07 6.00 5803.60 11349.27 10212.08 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 5803.60 11349.27 10212.08 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 5803.60 11349.27 10212.08 =============== 607-55031 Mesh Post (Spec) Each =================================================== IM0703-323 GEORGETOWN HILL CHUTE 2 AND 3 08/30/07 4.00 6930.00 12212.52 10945.08 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 6930.00 12212.52 10945.08 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 6930.00 12212.52 10945.08 =============== 607-55050 Mesh Anchor (Spec) Each =================================================== IM0703-323 GEORGETOWN HILL CHUTE 2 AND 3 08/30/07 100.00 1177.55 1758.96 1348.82 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 100.00 1177.55 1758.96 1348.82 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 100.00 1177.55 1758.96 1348.82 =============== 607-55100 Wire Mesh Sq Foot ================================================ IM0703-323 GEORGETOWN HILL CHUTE 2 AND 3 08/30/07 102,000.00 2.96 2.20 1.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 102,000.00 2.96 2.20 1.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 102,000.00 2.96 2.20 1.30 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 289 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-55101 Cable Net Sq Foot ================================================ NH 5502-055 COALBANK PASS 08/09/07 60,748.00 8.00 7.45 6.90 IM0703-323 GEORGETOWN HILL CHUTE 2 AND 3 08/30/07 14,000.00 15.23 13.63 17.68 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 74,748.00 9.35 9.40 8.92 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 74,748.00 9.35 9.40 8.92 =============== 607-60001 Pedest Gate (Spec) Each =================================================== SHE 5502-054 02/22/07 2.00 1500.00 664.89 495.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1500.00 664.89 495.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1500.00 664.89 495.00 =============== 607-60002 Game Ramp Each =================================================== SHE 0702-267 NEAR VAIL IN EAGLE COUNTY 08/02/07 70.00 10000.00 8447.36 5500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 70.00 10000.00 8447.36 5500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 70.00 10000.00 8447.36 5500.00 =============== 607-60110 10 Ft Gate Each =================================================== STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 4.00 300.00 281.67 275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 300.00 281.67 275.00 SHE 0702-267 NEAR VAIL IN EAGLE COUNTY 08/02/07 1.00 1150.00 956.00 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1150.00 956.00 1200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 470.00 397.93 460.00 =============== 607-60112 12 Ft Gate Each =================================================== STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 4.00 350.00 328.83 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 350.00 328.83 350.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 350.00 328.83 350.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 290 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-60114 14 Ft Gate Each =================================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 1.00 500.00 313.05 232.18 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 500.00 313.05 232.18 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 500.00 313.05 232.18 =============== 607-60116 16 Ft Gate Each =================================================== NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 6.00 350.00 305.00 305.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 350.00 305.00 305.00 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 2.00 400.00 445.12 305.00 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 1.00 500.00 3500.00 4500.00 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 1.00 500.00 1368.33 530.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 450.00 1037.08 1410.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 390.00 827.91 747.00 =============== 607-60120 20 Ft Gate Each =================================================== STA 0661-009 ON SH 66 IN WELD COUNTY 02/01/07 1.00 400.00 531.60 412.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 400.00 531.60 412.00 CR100-126 WEST OF KIT CARSON 08/16/07 7.00 331.91 168.14 185.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7.00 331.91 168.14 185.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 340.42 263.79 213.38 =============== 607-60203 3 Ft Gate S (CL) Each =================================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 2.00 700.00 155.94 160.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 291 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-60203 3 Ft Gate S (CL) Each =================================================== STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 1.00 200.00 424.88 290.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 533.33 245.58 203.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 533.33 245.58 203.33 =============== 607-60270 20 Ft Gate D (CL) Each =================================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 1.00 1500.00 768.64 674.57 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 1500.00 768.64 674.57 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1500.00 768.64 674.57 =============== 607-60274 24 Ft Gate D (CL) Each =================================================== IM0252-388 I-25 LARKSPUR INTERCHANGE NOR 03/08/07 2.00 3000.00 876.74 1205.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 3000.00 876.74 1205.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 3000.00 876.74 1205.00 =============== 607-60316 16 Ft Gate Twin Each =================================================== NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 2.00 450.00 390.00 390.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 450.00 390.00 390.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 450.00 390.00 390.00 =============== 607-60420 20 Ft Gate Twin (Spec) Each =================================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 2.00 1500.00 1355.80 1023.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 1500.00 1355.80 1023.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1500.00 1355.80 1023.20 =============== 607-60424 24 Ft Gate Twin (Spec) Each =================================================== SHE 5502-054 02/22/07 1.00 1500.00 1644.83 880.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1500.00 1644.83 880.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1500.00 1644.83 880.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 292 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-60620 Road Closure Gate Each =================================================== SHE 0931-027 SH 93 @ SH 72 01/25/07 1.00 10000.00 12094.07 10060.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 10000.00 12094.07 10060.00 NH 0405-025 KIT CARSON BRIDGE 04/26/07 1.00 12857.51 11063.65 11000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 12857.51 11063.65 11000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 11428.76 11636.10 10530.00 =============== 608-00000 Conc Sidewalk Sq Yard ================================================ HB 0063-021 US 6: RIFLE TO NEW CASTLE 01/04/07 130.00 60.00 99.50 80.00 STA 0961-012 SH 96, OVERLAY IN PUEBLO 01/04/07 961.00 50.00 61.05 70.00 STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 33.00 60.00 157.84 175.00 STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 34.00 50.00 169.33 215.00 SHE 0931-027 SH 93 @ SH 72 01/25/07 10.00 50.00 130.63 85.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 3,320.00 43.00 33.76 26.54 SHE 1151-018 SH 115 - GUMAER AVENUE EAST 03/08/07 217.00 50.00 56.61 34.80 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 6.00 90.00 136.65 180.00 HB 065A-019 SH 65 THRU CEDAREDGE 03/08/07 9.00 100.00 156.33 75.00 STA0091-030 SH 9 BETWEEN FAIRPLAY AND ALM 03/22/07 26.00 60.00 79.07 109.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,746.00 45.65 49.85 40.43 NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 525.00 100.00 69.75 70.00 NH 030A-025 SH30 (HAVANA)- PARKER TO FLOR 04/19/07 88.00 50.00 47.20 37.00 NH 0405-025 KIT CARSON BRIDGE 04/26/07 250.00 39.52 41.56 30.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 5,794.00 38.00 27.65 22.60 NH0341-071 US 34: GARFIELD TO MORNING DR 06/14/07 200.00 40.00 56.67 55.00 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 66.00 100.00 59.50 45.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 1,576.00 40.00 31.17 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8,499.00 42.90 32.44 28.20 SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 26.00 46.00 40.00 40.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 293 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 608-00000 Conc Sidewalk Sq Yard ================================================ NH 1601-056 US 160 @ ROOSA AVE 08/23/07 165.00 80.00 53.13 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 191.00 75.37 52.17 52.96 STA 340A-013 SH 340 IN FRUITA 10/25/07 1,723.00 26.00 40.30 37.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 1,630.00 45.00 39.96 43.00 STSR400-229 SH 14, SH 93, & SH 157 IN BOU 12/06/07 15.00 100.00 165.85 174.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,368.00 35.52 40.55 40.51 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16,804.00 42.57 39.18 34.40 =============== 608-00003 Conc Sidewalk (Fast Track) Sq Yard ================================================ NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 7.00 60.00 56.62 42.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7.00 60.00 56.62 42.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 60.00 56.62 42.00 =============== 608-00006 Conc Sidewalk (6 In) Sq Yard ================================================ STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 853.00 35.00 43.89 39.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 853.00 35.00 43.89 39.30 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 235.00 40.00 29.00 30.11 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 235.00 40.00 29.00 30.11 BR 0253-192 I-25&128TH 08/16/07 60.00 45.00 53.53 34.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 2,742.00 36.00 49.28 53.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 176.00 50.00 90.13 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,978.00 37.01 51.79 55.99 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 294 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 608-00006 Conc Sidewalk (6 In) Sq Yard ================================================ BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 152.00 40.00 58.53 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 152.00 40.00 58.53 30.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,218.00 36.88 48.44 50.23 =============== 608-00010 Conc Curb Ramp Sq Yard ================================================ HB 0063-021 US 6: RIFLE TO NEW CASTLE 01/04/07 306.00 150.00 261.46 96.75 STA 0961-012 SH 96, OVERLAY IN PUEBLO 01/04/07 1,008.00 150.00 146.00 155.00 STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 290.00 130.00 169.31 185.00 STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 61.00 120.00 210.83 270.00 NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 599.00 125.00 51.08 46.50 SHE 0931-027 SH 93 @ SH 72 01/25/07 5.00 175.00 360.20 185.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 429.00 140.00 78.80 83.40 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 124.00 120.00 110.88 88.00 SHE 1151-018 SH 115 - GUMAER AVENUE EAST 03/08/07 25.00 140.00 132.75 57.30 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 78.00 120.00 255.17 270.00 HB 065A-019 SH 65 THRU CEDAREDGE 03/08/07 44.00 150.00 209.17 80.00 STA0091-030 SH 9 BETWEEN FAIRPLAY AND ALM 03/22/07 26.00 150.00 176.70 244.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,995.00 138.95 149.82 121.47 NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 873.00 200.00 95.88 118.50 NH 030A-025 SH30 (HAVANA)- PARKER TO FLOR 04/19/07 364.00 120.00 114.72 120.75 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 203.00 125.00 132.83 178.80 NH0341-071 US 34: GARFIELD TO MORNING DR 06/14/07 1,327.00 53.00 90.33 55.00 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 75.00 125.00 185.88 135.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 62.20 120.00 156.67 130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,904.20 113.91 103.86 94.65 SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 39.00 125.00 132.00 132.00 BR 0253-192 I-25&128TH 08/16/07 25.00 172.00 164.85 125.00 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 9.00 400.00 150.63 250.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 114.00 110.00 94.22 129.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 295 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 608-00010 Conc Curb Ramp Sq Yard ================================================ STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 37.00 500.00 189.88 190.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 224.00 195.60 126.63 144.27 STA 340A-013 SH 340 IN FRUITA 10/25/07 78.00 85.00 117.38 105.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 189.00 125.50 111.74 110.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 33.00 200.00 155.66 145.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 300.00 123.17 116.91 112.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,423.20 128.87 128.48 109.72 =============== 608-00011 Curb Ramp (Fast Track) Sq Yard ================================================ NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 265.00 120.00 149.11 147.30 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 170.00 120.00 194.69 207.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 435.00 120.00 168.62 170.83 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 435.00 120.00 168.62 170.83 =============== 608-00012 Curb Ramp (Spec) Sq Yard ================================================ CC 0821-084 SH82 ASPEN 12/20/07 26.00 225.00 290.33 101.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 26.00 225.00 290.33 101.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26.00 225.00 290.33 101.00 =============== 608-00015 Truncated Domes Sq Foot ================================================ NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 845.00 50.00 29.09 34.66 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 150.00 70.00 80.73 40.00 NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 128.00 75.00 54.83 42.00 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 132.00 60.00 79.32 77.40 SHE 1151-018 SH 115 - GUMAER AVENUE EAST 03/08/07 12.00 55.00 80.26 30.60 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 42.00 80.00 79.00 75.00 HB 065A-019 SH 65 THRU CEDAREDGE 03/08/07 56.00 70.00 68.83 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,365.00 57.30 45.10 42.93 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 296 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 608-00015 Truncated Domes Sq Foot ================================================ NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 760.00 50.00 67.25 91.00 NH0341-071 US 34: GARFIELD TO MORNING DR 06/14/07 296.00 35.00 41.50 44.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,056.00 45.80 61.43 77.83 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,421.00 52.28 50.57 58.15 =============== 608-00020 Conc Bikeway Sq Yard ================================================ BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 867.00 50.00 51.66 62.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 867.00 50.00 51.66 62.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 867.00 50.00 51.66 62.50 =============== 608-00051 Inst Brick Pavers Sq Foot ================================================ STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 64.00 15.00 21.58 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 64.00 15.00 21.58 21.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 64.00 15.00 21.58 21.00 =============== 608-00350 Conc Sidewalk (C) Sq Yard ================================================ CC 0821-084 SH82 ASPEN 12/20/07 1,055.00 68.00 80.66 60.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,055.00 68.00 80.66 60.95 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,055.00 68.00 80.66 60.95 =============== 608-01550 Place Asph Millings Sq Yard ================================================ IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 690.00 10.00 7.99 10.04 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 690.00 10.00 7.99 10.04 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 690.00 10.00 7.99 10.04 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 297 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 608-10010 Sidewalk Drain Each =================================================== STA 340A-013 SH 340 IN FRUITA 10/25/07 2.00 1500.00 1658.75 1900.00 CC 0821-084 SH82 ASPEN 12/20/07 2.00 500.00 2220.83 2700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 1000.00 1996.00 2300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 1000.00 1996.00 2300.00 =============== 609-20010 Curb Ty 2 B Lin Foot =============================================== NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 105.00 21.00 23.94 20.56 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 105.00 21.00 23.94 20.56 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 105.00 21.00 23.94 20.56 =============== 609-21010 C and G Ty 2 I-B Lin Foot =============================================== NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 299.00 12.00 16.30 18.00 NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 667.00 15.00 15.43 16.00 SHE 0931-027 SH 93 @ SH 72 01/25/07 10.00 40.00 53.40 40.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 2,526.00 15.00 18.42 13.51 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 221.00 20.00 16.42 17.35 SHE 1151-018 SH 115 - GUMAER AVENUE EAST 03/08/07 72.00 20.00 30.85 9.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,795.00 15.22 18.00 14.53 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 941.00 11.00 13.60 3.91 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 200.00 15.00 26.45 25.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 2,044.80 12.00 13.83 14.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,185.80 11.89 14.70 12.03 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 3,966.00 12.00 17.63 19.50 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 1,627.00 30.00 25.88 27.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5,593.00 17.24 20.02 21.68 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 298 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 609-21010 C and G Ty 2 I-B Lin Foot =============================================== STA 340A-013 SH 340 IN FRUITA 10/25/07 571.00 15.00 25.29 24.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 8,518.00 12.25 14.66 17.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 99.00 25.00 19.54 17.00 CC 0821-084 SH82 ASPEN 12/20/07 1,941.00 22.00 22.87 16.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 11,129.00 14.21 16.14 17.31 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 23,702.80 14.77 16.89 17.18 =============== 609-21011 C and G Ty 2 I-M Lin Foot =============================================== HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 4,351.00 9.80 17.50 14.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 4,366.00 10.00 14.60 10.38 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 394.00 25.00 37.50 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 9,111.00 10.55 16.78 13.39 STA 340A-013 SH 340 IN FRUITA 10/25/07 1,311.00 15.00 21.91 19.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,311.00 15.00 21.91 19.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10,422.00 11.11 17.28 14.16 =============== 609-21013 C and G Ty 2 I-M (Spec) Lin Foot =============================================== HB 065A-019 SH 65 THRU CEDAREDGE 03/08/07 43.00 30.00 57.67 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 43.00 30.00 57.67 35.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 43.00 30.00 57.67 35.00 =============== 609-21020 C and G Ty 2 II-B Lin Foot =============================================== HB 0063-021 US 6: RIFLE TO NEW CASTLE 01/04/07 1,363.00 20.00 33.94 25.15 STA 0961-012 SH 96, OVERLAY IN PUEBLO 01/04/07 3,330.00 20.00 24.70 32.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 299 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 609-21020 C and G Ty 2 II-B Lin Foot =============================================== STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 562.00 12.00 35.98 38.00 STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 270.00 17.00 40.85 48.00 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 2,029.00 20.00 18.10 20.00 NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 1,153.00 15.00 16.18 16.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 14,986.00 18.00 18.88 14.40 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 1,267.00 18.00 18.31 13.45 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 2,100.00 18.00 16.40 12.00 SHE 1151-018 SH 115 - GUMAER AVENUE EAST 03/08/07 1,020.00 15.00 25.66 14.00 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 68.00 20.00 90.00 85.00 HB 065A-019 SH 65 THRU CEDAREDGE 03/08/07 14.00 40.00 60.42 35.00 STA0091-030 SH 9 BETWEEN FAIRPLAY AND ALM 03/22/07 44.00 30.00 50.05 78.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 28,206.00 18.15 21.34 18.30 NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 2,099.00 30.00 29.93 22.70 NH 030A-025 SH30 (HAVANA)- PARKER TO FLOR 04/19/07 578.00 19.00 20.92 15.00 NH 0405-025 KIT CARSON BRIDGE 04/26/07 417.00 26.55 33.70 35.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 15,030.00 13.00 14.40 6.60 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 575.00 25.00 25.38 25.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 3,146.70 15.00 14.47 15.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 21,845.70 15.65 16.87 10.68 SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 162.00 30.00 27.00 27.00 BR 0253-192 I-25&128TH 08/16/07 107.00 20.00 27.50 31.00 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 392.00 35.00 25.00 30.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 3,499.00 17.00 18.25 20.50 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 877.00 30.00 32.63 31.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5,037.00 21.15 21.52 23.50 STA 340A-013 SH 340 IN FRUITA 10/25/07 4,098.00 18.00 20.79 18.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 12,433.00 13.75 18.22 21.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 182.00 30.00 19.99 18.00 CC 0821-084 SH82 ASPEN 12/20/07 11,763.00 18.00 25.21 17.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 28,476.00 16.22 21.08 19.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 83,564.70 17.02 20.32 16.86 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 300 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 609-21021 C and G Ty 2 II-M Lin Foot =============================================== STA 340A-013 SH 340 IN FRUITA 10/25/07 160.00 16.00 25.79 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 160.00 16.00 25.79 25.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 160.00 16.00 25.79 25.00 =============== 609-23000 Gutter (Special) Lin Foot =============================================== STA 340A-013 SH 340 IN FRUITA 10/25/07 55.00 100.00 59.33 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 55.00 100.00 59.33 55.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 55.00 100.00 59.33 55.00 =============== 609-24000 Gutter Ty 2 (Spec) Lin Foot =============================================== NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 90.00 22.00 39.70 57.36 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 270.00 60.00 120.00 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 360.00 50.50 99.93 81.84 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 360.00 50.50 99.93 81.84 =============== 609-24002 Gutter Ty 2 (2 Ft) Lin Foot =============================================== BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 19.00 20.00 59.28 42.50 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 323.00 15.00 17.80 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 342.00 15.28 22.81 21.25 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 800.00 25.00 26.56 20.44 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 800.00 25.00 26.56 20.44 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,142.00 22.09 26.00 20.68 =============== 609-24003 Gutter Ty 2 (3 Ft) Lin Foot =============================================== NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 36.00 20.00 26.13 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 36.00 20.00 26.13 30.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 301 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 609-24003 Gutter Ty 2 (3 Ft) Lin Foot =============================================== C 0504-055 PUEBLO COUNTY, US-50C AT SALT 11/01/07 68.00 20.00 38.67 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 68.00 20.00 38.67 40.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 104.00 20.00 34.33 36.54 =============== 609-24004 Gutter Ty 2 (4 Ft) Lin Foot =============================================== STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 20.00 30.00 95.33 95.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 30.00 95.33 95.00 SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 32.00 35.00 27.00 27.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 32.00 35.00 27.00 27.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 227.00 20.00 23.18 17.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 227.00 20.00 23.18 17.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 279.00 22.44 28.98 23.74 =============== 609-24006 Gutter Ty 2 (6 Ft) Lin Foot =============================================== STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 85.00 125.00 40.00 29.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 85.00 125.00 40.00 29.50 NH 0405-025 KIT CARSON BRIDGE 04/26/07 48.00 34.20 53.36 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 48.00 34.20 53.36 65.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 302 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 609-24006 Gutter Ty 2 (6 Ft) Lin Foot =============================================== STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 117.00 35.75 41.75 53.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 117.00 35.75 41.75 53.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 250.00 65.80 42.32 47.31 =============== 609-24008 Gutter Ty 2 (8 Ft) Lin Foot =============================================== NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 100.00 55.00 63.25 46.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 100.00 55.00 63.25 46.25 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 287.00 38.00 40.69 31.75 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 35.00 50.00 62.43 36.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 322.00 39.30 42.51 32.21 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 201.00 65.00 16.50 18.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 201.00 65.00 16.50 18.50 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 24.00 55.50 62.48 135.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 24.00 55.50 62.48 135.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 647.00 50.31 38.25 33.93 =============== 609-31010 C and G Ty 2 I-B (Fast Track) Lin Foot =============================================== NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 600.00 25.00 22.58 16.25 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 144.00 25.00 27.82 25.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 744.00 25.00 23.73 18.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 744.00 25.00 23.73 18.10 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 303 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 609-31020 C and G Ty 2 II-B (Fast Track) Lin Foot =============================================== NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 571.00 30.00 25.01 17.35 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 162.00 30.00 32.05 29.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 733.00 30.00 26.76 19.92 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 733.00 30.00 26.76 19.92 =============== 609-34006 Gutter Ty 2 (6 Ft) (Fast Track) Lin Foot =============================================== NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 40.00 50.00 51.37 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 40.00 50.00 51.37 40.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 50.00 51.37 40.00 =============== 609-40010 Curb Ty 4 B Lin Foot =============================================== HB 065A-019 SH 65 THRU CEDAREDGE 03/08/07 11.00 40.00 80.42 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11.00 40.00 80.42 40.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 40.00 80.42 40.00 =============== 609-40011 Curb Ty 4 M Lin Foot =============================================== NH 0405-025 KIT CARSON BRIDGE 04/26/07 1,511.00 9.00 18.55 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,511.00 9.00 18.55 20.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,511.00 9.00 18.55 20.00 =============== 609-60011 Curb Ty 6 M Lin Foot =============================================== NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 2,484.00 5.50 6.70 6.00 NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 458.00 8.00 7.88 5.00 IM 0253-194 ON I-25 IN WELD COUNTY 01/25/07 2,014.00 6.50 7.17 10.00 NH 0402-070 US 40 ROUTT COUNTY 02/08/07 3,473.00 10.00 10.25 8.50 IM0252-388 I-25 LARKSPUR INTERCHANGE NOR 03/08/07 1,000.00 7.50 9.95 10.95 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 304 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 609-60011 Curb Ty 6 M Lin Foot =============================================== STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 807.00 9.00 8.17 10.50 IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 800.00 15.00 8.94 4.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11,036.00 8.33 8.18 8.12 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 1,102.00 7.33 9.83 6.50 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 1,010.00 7.00 7.64 6.75 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 160.00 14.00 12.69 12.00 STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 750.00 6.88 4.23 4.35 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 2,346.00 10.00 7.41 7.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 360.00 5.00 6.07 4.50 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 5,000.00 5.54 7.46 7.07 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10,728.00 7.04 7.75 6.76 BR 0253-192 I-25&128TH 08/16/07 1,700.00 10.00 8.25 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,700.00 10.00 8.25 10.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 80.00 20.50 21.84 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 80.00 20.50 21.84 45.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 23,544.00 7.90 8.04 7.76 =============== 610-00010 Median Cover Matl (Dec) Sq Foot ================================================ BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 4,135.00 10.00 5.63 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,135.00 10.00 5.63 5.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,135.00 10.00 5.63 5.00 =============== 610-00020 Median Cover (Pattern Conc) Sq Foot ================================================ NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 2,281.00 9.00 8.78 8.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 305 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 610-00020 Median Cover (Pattern Conc) Sq Foot ================================================ NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 21,039.00 11.00 5.65 5.69 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 23,320.00 10.80 5.95 5.92 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 800.00 10.00 20.00 10.00 CR400-216 SIGNALS @ US34 & SH37, KERSEY 05/24/07 53.00 15.00 40.00 30.00 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 30.00 10.00 22.25 9.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 4,835.00 8.00 6.70 7.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,718.00 8.36 8.33 7.85 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 1,138.00 10.00 10.33 6.00 CC 0821-084 SH82 ASPEN 12/20/07 1,160.00 13.00 16.40 9.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,298.00 11.51 13.40 7.59 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 31,336.00 10.41 7.37 6.39 =============== 610-00024 Median Cover (4 In Pattern Conc) Sq Foot ================================================ HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 12,827.00 4.90 7.34 7.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 71,303.00 5.00 4.83 4.32 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 84,130.00 4.98 5.43 4.73 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 3,388.00 8.00 12.13 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,388.00 8.00 12.13 11.00 STA 340A-013 SH 340 IN FRUITA 10/25/07 6,174.00 6.00 10.38 8.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6,174.00 6.00 10.38 8.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 93,692.00 5.16 5.95 5.22 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 306 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 610-00026 Median Cover (6 In Pattern Conc) Sq Foot ================================================ NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 270.00 6.00 13.00 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 270.00 6.00 13.00 22.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 270.00 6.00 13.00 22.00 =============== 610-00030 Median Cover Matl (Conc) Sq Foot ================================================ NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 2,985.00 4.50 6.29 5.00 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 381.00 10.00 8.66 5.80 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 4,380.00 5.00 5.36 3.20 SHE 1151-018 SH 115 - GUMAER AVENUE EAST 03/08/07 134.00 8.00 9.89 3.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7,880.00 5.10 5.82 4.01 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 34,906.00 7.50 6.64 5.75 STSR400-229 SH 14, SH 93, & SH 157 IN BOU 12/06/07 307.00 5.00 16.61 17.50 CC 0821-084 SH82 ASPEN 12/20/07 570.00 7.50 13.13 8.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 35,783.00 7.48 6.77 5.89 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 43,663.00 7.05 6.59 5.55 =============== 610-00100 Median Edging (Pattern Conc) Lin Foot =============================================== CC 0821-084 SH82 ASPEN 12/20/07 3,400.00 27.00 27.32 30.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,400.00 27.00 27.32 30.90 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,400.00 27.00 27.32 30.90 =============== 611-00027 26 Ft Deer Gd Each =================================================== SHE 5502-054 02/22/07 2.00 42000.00 22902.29 18300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 42000.00 22902.29 18300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 42000.00 22902.29 18300.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 307 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00001 Delin (Ty I) Each =================================================== HB 0063-021 US 6: RIFLE TO NEW CASTLE 01/04/07 12.00 20.00 19.65 17.50 STA 0961-012 SH 96, OVERLAY IN PUEBLO 01/04/07 20.00 20.00 17.35 20.75 STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 680.00 18.00 15.78 15.50 STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 323.00 18.00 15.61 18.50 NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 21.00 18.00 17.57 12.00 STA 012A-042 SH 12, S. OF LA VETA 01/18/07 300.00 18.00 18.17 13.00 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 144.00 15.00 17.95 22.00 STA 069A-021 SH 69, W. OF WALSENBURG 01/25/07 300.00 18.00 14.43 14.00 SHE 0931-027 SH 93 @ SH 72 01/25/07 9.00 15.00 26.83 30.00 IM 0253-194 ON I-25 IN WELD COUNTY 01/25/07 209.00 15.00 19.33 18.00 NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 58.00 18.00 21.50 21.50 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 11.00 19.00 20.61 21.00 STA 086A-045 SH 86 - FRANKTOWN TO ELBERT C 02/01/07 79.00 18.00 16.68 15.60 HB 149A-023 SOUTH FORK TO CREEDE - SHOULD 02/08/07 2.00 20.00 50.58 50.00 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 10.00 20.00 12.44 12.50 SHE 1151-020 SH 115 VMS, MP 17 AND MP 41 02/15/07 2.00 25.00 59.68 24.97 IM0252-388 I-25 LARKSPUR INTERCHANGE NOR 03/08/07 160.00 16.00 17.85 16.45 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 6.00 20.00 35.26 17.00 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 39.00 17.00 15.11 12.50 SHE 1151-018 SH 115 - GUMAER AVENUE EAST 03/08/07 4.00 17.00 22.28 22.90 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 827.00 17.00 16.82 16.00 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 28.00 20.00 20.67 19.00 IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 30.00 18.00 16.80 11.50 SHE 0504-050 INTERSECTION OF SH 50B AND SH 03/22/07 23.00 20.00 18.23 15.72 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,297.00 17.38 16.78 16.22 SHE 165A-011 ALONG SH 165 N/O RYE 04/05/07 90.00 15.00 17.28 16.00 NH 0405-025 KIT CARSON BRIDGE 04/26/07 94.00 17.48 13.92 15.00 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 128.00 20.00 23.50 17.00 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 61.00 20.00 26.46 38.85 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 46.00 19.34 15.95 12.50 STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 300.00 14.83 13.68 12.80 IM0703-317 FROM MP 221.30 TO MP 251.30 J 05/17/07 50.00 18.55 18.33 21.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 357.00 14.00 14.20 17.79 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 30.00 18.00 15.14 16.50 STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 80.00 16.00 22.60 24.00 IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 115.00 20.00 19.00 18.00 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 24.00 20.00 58.25 50.00 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 47.00 18.00 16.67 19.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 492.00 15.00 23.06 22.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 3.00 18.00 29.33 24.00 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 8.00 25.00 35.36 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,925.00 16.16 19.48 19.12 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 308 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00001 Delin (Ty I) Each =================================================== HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 120.00 20.00 17.82 14.35 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 46.00 18.00 17.47 17.00 BR 0253-192 I-25&128TH 08/16/07 26.00 20.00 29.21 32.50 CR100-126 WEST OF KIT CARSON 08/16/07 182.00 15.91 26.80 16.00 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 4.00 18.00 23.48 28.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 29.00 15.00 17.88 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 407.00 17.57 21.50 16.80 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 6.00 16.00 21.75 21.00 SHE0092-019 SH 9 NORTH OF SILVERTHORNE, I 10/18/07 56.00 21.25 21.43 18.15 STA 340A-013 SH 340 IN FRUITA 10/25/07 24.00 17.00 19.38 13.00 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 24.00 20.00 21.87 15.80 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 10.00 18.00 18.71 17.00 CC 0821-084 SH82 ASPEN 12/20/07 67.00 20.00 17.08 16.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 187.00 19.75 19.46 16.63 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,816.00 17.07 17.95 17.23 =============== 612-00002 Delin (Ty II) Each =================================================== STA 0961-012 SH 96, OVERLAY IN PUEBLO 01/04/07 1.00 21.00 20.00 22.00 STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 9.00 19.00 16.83 19.50 NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 9.00 19.00 19.14 13.00 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 273.00 17.00 19.01 23.00 NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 29.00 20.00 24.50 24.50 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 11.00 21.00 22.53 23.00 STA 086A-045 SH 86 - FRANKTOWN TO ELBERT C 02/01/07 25.00 20.00 17.94 16.70 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 10.00 20.00 13.47 13.40 IM0252-388 I-25 LARKSPUR INTERCHANGE NOR 03/08/07 75.00 18.00 21.10 16.45 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 86.00 18.00 16.37 13.50 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 23.00 19.00 17.79 17.00 IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 10.00 19.00 17.99 12.50 SHE 0504-050 INTERSECTION OF SH 50B AND SH 03/22/07 12.00 22.00 20.49 16.93 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 573.00 17.98 18.38 19.59 SHE 165A-011 ALONG SH 165 N/O RYE 04/05/07 10.00 20.00 18.98 18.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 309 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00002 Delin (Ty II) Each =================================================== NH 0405-025 KIT CARSON BRIDGE 04/26/07 16.00 21.94 17.21 20.00 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 14.00 20.00 27.09 38.85 IM0703-317 FROM MP 221.30 TO MP 251.30 J 05/17/07 10.00 18.38 19.67 23.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 129.00 16.00 15.44 19.77 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 12.00 18.00 16.31 17.50 STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 9.00 18.00 23.68 24.50 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 39.00 20.00 24.09 23.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 3.00 20.00 30.00 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 242.00 17.76 18.45 21.60 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 12.00 20.00 19.50 15.57 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 32.00 19.00 18.65 18.00 IM 0703-331 WB I-70 AT M.P. 259.70 AND M. 09/06/07 35.00 22.00 30.19 18.76 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 6.00 20.00 18.88 19.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 85.00 20.45 22.70 18.04 SHE0092-019 SH 9 NORTH OF SILVERTHORNE, I 10/18/07 6.00 23.50 23.58 24.90 STA 340A-013 SH 340 IN FRUITA 10/25/07 7.00 18.00 20.71 14.00 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 2.00 21.00 23.67 16.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 15.00 20.60 22.48 18.66 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 915.00 18.19 18.85 19.96 =============== 612-00003 Delin (Ty III) Each =================================================== HB 0063-021 US 6: RIFLE TO NEW CASTLE 01/04/07 17.00 25.00 23.82 19.90 STA 0961-012 SH 96, OVERLAY IN PUEBLO 01/04/07 7.00 22.00 21.82 23.10 STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 140.00 20.00 17.94 17.00 STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 64.00 21.00 18.50 22.00 NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 4.00 20.00 20.74 14.00 STA 012A-042 SH 12, S. OF LA VETA 01/18/07 214.00 21.00 21.08 16.00 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 60.00 19.00 20.24 24.00 STA 069A-021 SH 69, W. OF WALSENBURG 01/25/07 166.00 21.00 16.45 16.00 IM 0253-194 ON I-25 IN WELD COUNTY 01/25/07 16.00 18.00 23.83 24.00 NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 10.00 22.00 27.75 27.75 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 10.00 23.00 23.75 24.00 STA 086A-045 SH 86 - FRANKTOWN TO ELBERT C 02/01/07 42.00 21.00 19.19 17.80 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 310 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00003 Delin (Ty III) Each =================================================== NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 5.00 20.00 14.51 14.45 SHE 1151-020 SH 115 VMS, MP 17 AND MP 41 02/15/07 2.00 26.00 70.36 24.97 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 16.00 25.00 20.87 21.60 IM0252-388 I-25 LARKSPUR INTERCHANGE NOR 03/08/07 37.00 20.00 24.29 16.45 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 41.00 19.00 17.99 14.50 SHE 1151-018 SH 115 - GUMAER AVENUE EAST 03/08/07 2.00 18.00 30.85 24.20 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 96.00 21.00 18.75 18.00 IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 10.00 20.00 19.20 13.55 SHE 0504-050 INTERSECTION OF SH 50B AND SH 03/22/07 5.00 25.00 22.13 18.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 964.00 20.74 19.53 17.83 SHE 165A-011 ALONG SH 165 N/O RYE 04/05/07 25.00 22.00 20.89 19.00 NH 0405-025 KIT CARSON BRIDGE 04/26/07 4.00 24.41 20.49 25.00 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 80.00 30.00 27.50 20.00 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 2.00 20.00 28.46 38.85 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 4.00 24.00 18.19 15.00 STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 57.00 19.01 16.40 16.00 IM0703-317 FROM MP 221.30 TO MP 251.30 J 05/17/07 10.00 23.81 20.67 25.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 16.00 18.00 16.93 22.72 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 2.00 25.00 17.62 18.50 NH 3851-016 US 385 NORTH OF BURLINGTON 05/24/07 18.00 22.70 28.50 17.50 STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 18.00 20.00 24.73 25.75 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 5.00 25.00 26.00 24.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 55.00 25.00 25.13 24.00 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 2.00 28.00 36.94 18.57 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 298.00 24.05 23.65 20.57 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 43.00 25.00 21.16 17.68 BRR500-087 US 160 PAGOSA SPRINGS 07/12/07 2.00 25.00 86.75 23.50 NH 5502-055 COALBANK PASS 08/09/07 2.00 25.00 22.63 17.25 BR 0253-192 I-25&128TH 08/16/07 2.00 22.00 28.80 32.50 CR100-126 WEST OF KIT CARSON 08/16/07 30.00 21.13 35.45 17.50 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 2.00 22.00 37.17 60.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 6.00 25.00 20.63 19.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 87.00 23.53 25.34 19.15 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 2.00 20.00 24.00 22.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 311 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00003 Delin (Ty III) Each =================================================== SHE0092-019 SH 9 NORTH OF SILVERTHORNE, I 10/18/07 8.00 25.25 25.18 27.90 STA 340A-013 SH 340 IN FRUITA 10/25/07 1.00 20.00 22.31 16.00 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 13.00 22.00 25.46 16.59 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 6.00 20.00 23.39 20.00 CC 0821-084 SH82 ASPEN 12/20/07 12.00 23.00 22.50 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 42.00 22.48 24.17 21.02 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,391.00 21.67 20.73 18.60 =============== 612-00010 Delin (Spec) Each =================================================== SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 4.00 20.00 27.06 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 20.00 27.06 18.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 20.00 27.06 18.00 =============== 612-00022 Delin (Ty II) (Barrier) Each =================================================== IM 0702-269 I 70 IN EAGLE COUNTY 01/11/07 20.00 15.00 54.50 59.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 15.00 54.50 59.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 15.00 54.50 59.00 =============== 612-00031 Delin (Ty I) (Extra Ht) Each =================================================== NH 0402-070 US 40 ROUTT COUNTY 02/08/07 100.00 40.00 49.00 48.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 100.00 40.00 49.00 48.00 STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 96.00 32.57 38.79 38.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 96.00 32.57 38.79 38.95 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 196.00 36.36 41.79 43.57 =============== 612-00032 Delin (Ty II) (Extra Ht) Each =================================================== NH 0402-070 US 40 ROUTT COUNTY 02/08/07 100.00 45.00 49.50 49.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 100.00 45.00 49.50 49.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 100.00 45.00 49.50 49.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 312 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00033 Delin (Ty III) (Extra Ht) Each =================================================== STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 7.00 44.93 45.53 54.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7.00 44.93 45.53 54.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 44.93 45.53 54.65 =============== 612-00041 Delin (Flex) (Ty I) Each =================================================== NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 10.00 25.00 42.66 36.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 25.00 42.66 36.00 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 35.00 26.06 41.95 32.00 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 6.00 30.00 50.00 50.00 STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 158.00 18.00 38.63 35.00 BR 059A-032 ON SH 59 IN SEDGWICK COUNTY 06/07/07 6.00 25.00 41.38 50.00 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 520.00 22.79 37.92 38.61 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 725.00 21.98 38.43 37.69 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 20.00 30.00 27.58 21.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 128.00 27.00 46.58 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 148.00 27.41 43.22 67.70 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 883.00 22.93 39.64 42.70 =============== 612-00042 Delin (Flex) (Ty II) Each =================================================== HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 61.00 26.89 42.99 33.00 STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 9.00 20.00 39.65 36.00 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 81.00 25.70 38.97 39.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 151.00 25.84 40.95 36.77 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 26.00 29.00 48.71 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 26.00 29.00 48.71 80.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 177.00 26.31 42.42 43.12 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 313 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00043 Delin (Flex) (Ty III) Each =================================================== HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 3.00 31.80 44.16 34.00 STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 16.00 22.00 40.48 37.00 BR 059A-032 ON SH 59 IN SEDGWICK COUNTY 06/07/07 2.00 30.00 43.75 55.00 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 48.00 28.35 40.00 40.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 69.00 27.08 40.52 40.02 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 4.00 40.00 34.12 28.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 8.00 33.25 49.85 83.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 12.00 35.50 43.44 64.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 81.00 28.32 41.18 43.67 =============== 612-00046 Delin (Flex) (Spec) (Ty I) Each =================================================== STA0091-030 SH 9 BETWEEN FAIRPLAY AND ALM 03/22/07 86.00 20.00 61.41 57.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 86.00 20.00 61.41 57.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 86.00 20.00 61.41 57.20 =============== 612-00048 Delin (Flex) (Spec) (Ty III) Each =================================================== STA0091-030 SH 9 BETWEEN FAIRPLAY AND ALM 03/22/07 36.00 20.00 62.61 63.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 36.00 20.00 62.61 63.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 36.00 20.00 62.61 63.30 =============== 612-00070 Reflector Strip (4 In) Each =================================================== IM 0702-269 I 70 IN EAGLE COUNTY 01/11/07 392.00 8.00 18.50 17.00 NH 0402-070 US 40 ROUTT COUNTY 02/08/07 776.00 30.00 29.00 33.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,168.00 22.62 25.48 27.63 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,168.00 22.62 25.48 27.63 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 314 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00075 Reflector Strip (6 In) Each =================================================== IM 0702-269 I 70 IN EAGLE COUNTY 01/11/07 7,368.00 10.00 20.00 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7,368.00 10.00 20.00 20.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,368.00 10.00 20.00 20.00 =============== 612-00270 Loc Mark (Util)(Flat Slat) Each =================================================== IM R400-215 I-25 & I-76 VMS INSTALLATION 09/06/07 10.00 225.00 121.20 154.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 225.00 121.20 154.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 225.00 121.20 154.00 =============== 612-00300 Steel Guard Post Each =================================================== NH 1601-056 US 160 @ ROOSA AVE 08/23/07 4.00 800.00 1262.50 650.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 800.00 1262.50 650.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 800.00 1262.50 650.00 =============== 612-15000 Inst Marker Each =================================================== IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 26.00 200.00 250.00 220.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 26.00 200.00 250.00 220.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26.00 200.00 250.00 220.00 =============== 613-00001 Direct Bor Cond Lin Foot =============================================== SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 720.00 20.00 15.64 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 720.00 20.00 15.64 14.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 720.00 20.00 15.64 14.00 =============== 613-00075 3/4 In Elec Cond Lin Foot =============================================== IM 0703-326 EISENHOWER JOHNSON MEMORIAL T 12/06/07 250.00 14.50 18.88 2.12 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 315 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-00075 3/4 In Elec Cond Lin Foot =============================================== BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 460.00 8.00 8.54 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 710.00 10.29 10.74 5.93 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 710.00 10.29 10.74 5.93 =============== 613-00100 1 In Elec Cond Lin Foot =============================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 749.00 11.00 11.63 5.51 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 749.00 11.00 11.63 5.51 BR 0253-192 I-25&128TH 08/16/07 348.00 7.00 7.45 10.25 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 268.00 15.00 7.41 7.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 616.00 10.48 7.44 9.05 IM 0703-326 EISENHOWER JOHNSON MEMORIAL T 12/06/07 1,910.00 19.50 20.86 3.24 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 490.00 9.00 11.69 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,400.00 17.36 17.75 4.82 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,765.00 14.97 14.75 5.65 =============== 613-00125 1-1/4 In Elec Cond Lin Foot =============================================== CR600-285 VARIOUS LOCATIONS IN REGION 6 06/28/07 110.00 13.00 25.98 19.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 110.00 13.00 25.98 19.95 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 110.00 13.00 25.98 19.95 =============== 613-00150 1-1/2 In Elec Cond Lin Foot =============================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 1,993.00 11.00 13.23 13.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,993.00 11.00 13.23 13.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 316 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-00150 1-1/2 In Elec Cond Lin Foot =============================================== IM 0703-326 EISENHOWER JOHNSON MEMORIAL T 12/06/07 1,190.00 24.00 29.06 4.74 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,190.00 24.00 29.06 4.74 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,183.00 15.86 20.71 10.22 =============== 613-00200 2 In Elec Cond Lin Foot =============================================== SHE 1151-020 SH 115 VMS, MP 17 AND MP 41 02/15/07 150.00 18.00 14.88 23.74 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 150.00 18.00 14.88 23.74 NH 0405-025 KIT CARSON BRIDGE 04/26/07 3,361.00 8.84 8.23 8.50 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 4,960.00 12.00 5.68 6.02 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 1,350.00 10.00 6.12 7.50 NH 3851-016 US 385 NORTH OF BURLINGTON 05/24/07 35.00 15.00 67.83 58.50 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 2,547.00 17.00 7.17 7.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 1,900.00 10.00 9.82 6.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 14,153.00 11.70 7.13 7.15 BR 0253-192 I-25&128TH 08/16/07 1,312.00 8.00 4.20 5.25 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 11,813.00 12.00 12.21 12.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 13,125.00 11.60 10.47 11.78 C 0504-055 PUEBLO COUNTY, US-50C AT SALT 11/01/07 300.00 18.00 17.33 17.00 BR 0241-047 US 24, 2 MI S OF GRANITE, CHA 11/15/07 203.00 22.00 10.62 17.32 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 326.00 10.00 11.29 8.07 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 546.00 8.00 8.73 10.00 SHE 082A-010 SH 82 AND BUFFALO VALLEY ROAD 11/29/07 2,120.00 12.00 8.97 7.29 C120A-007 ON SH 120 AT PORTLAND OVER TH 11/29/07 780.00 16.00 8.30 5.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 338.00 10.00 8.54 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,613.00 12.75 9.51 8.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 32,041.00 11.84 8.58 9.30 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 317 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-00201 2 In Elec Cond (Jacked) Lin Foot =============================================== NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 600.00 15.00 12.80 11.50 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 322.00 15.00 16.94 13.00 STA402A-007 SH 402 & I-25 OFFRAMS AND E. 03/22/07 725.00 13.00 12.86 13.19 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,647.00 14.12 14.08 12.54 STA 0703-312 I-70 HIDDEN VALLEY AND FALL R 05/17/07 365.00 14.21 30.00 30.00 CR400-216 SIGNALS @ US34 & SH37, KERSEY 05/24/07 390.00 14.50 18.00 17.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 150.00 20.00 15.54 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 905.00 15.29 19.66 21.91 IM R400-215 I-25 & I-76 VMS INSTALLATION 09/06/07 275.00 30.00 21.95 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 275.00 30.00 21.95 20.00 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 250.00 15.00 15.94 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 250.00 15.00 15.94 15.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,077.00 15.96 15.87 16.16 =============== 613-00206 2 In Elec Cond (Bored) Lin Foot =============================================== SHE 0931-027 SH 93 @ SH 72 01/25/07 360.00 9.00 12.54 14.00 NH 1602-102 WITHIN THE ALAMOSA CITY LIMIT 02/15/07 220.00 18.00 13.25 14.50 SHE 1151-020 SH 115 VMS, MP 17 AND MP 41 02/15/07 375.00 26.00 15.89 11.54 IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 180.00 10.00 23.53 22.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,135.00 16.52 16.08 14.70 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 1,685.00 32.00 13.01 18.03 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 318 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-00206 2 In Elec Cond (Bored) Lin Foot =============================================== SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 1,990.00 10.00 17.66 16.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 2,630.00 8.00 13.37 8.50 ITSSW00-378 VMS REPLACEMENT IN REGIONS 1, 06/21/07 370.00 15.00 30.77 23.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6,675.00 15.04 15.52 13.98 SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 354.00 25.00 11.10 11.10 ITS SW00-457 DRCOG REGION 08/09/07 350.00 32.00 20.90 14.80 ITSSW00-455 VMS REPLACEMENT IN REGIONS 1, 08/30/07 2,675.00 25.00 38.00 42.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 422.00 38.00 39.63 31.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,801.00 27.09 35.68 35.40 IM 0703-336 WB I-70 AT M.P. 259.70 AND M. 10/18/07 14,400.00 11.00 14.13 12.50 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 264.00 15.00 26.80 25.00 SHE 160A-009 U.S. 160 MP 94.15 - MP 96.63 12/20/07 300.00 30.00 57.93 55.24 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 14,964.00 11.45 15.33 13.58 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26,575.00 14.81 17.10 16.85 =============== 613-00300 3 In Elec Cond Lin Foot =============================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 1,100.00 13.00 9.31 9.02 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,100.00 13.00 9.31 9.02 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 4,500.00 13.00 13.74 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,500.00 13.00 13.74 14.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 7,300.00 18.00 15.40 19.00 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 546.00 14.00 13.13 17.00 SHE 082A-010 SH 82 AND BUFFALO VALLEY ROAD 11/29/07 100.00 16.00 12.02 11.29 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 319 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-00300 3 In Elec Cond Lin Foot =============================================== IM 0703-326 EISENHOWER JOHNSON MEMORIAL T 12/06/07 1,040.00 39.50 50.98 10.51 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 338.00 15.00 7.44 7.00 CC 0821-084 SH82 ASPEN 12/20/07 90.00 47.00 41.33 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9,414.00 20.29 16.88 17.46 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15,014.00 17.57 16.12 15.81 =============== 613-00301 3 In Elec Cond (Jacked) Lin Foot =============================================== NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 1,200.00 17.00 14.70 15.00 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 693.00 20.00 18.99 14.00 STA402A-007 SH 402 & I-25 OFFRAMS AND E. 03/22/07 1,300.00 16.00 13.04 9.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,193.00 17.24 15.61 12.60 CR400-216 SIGNALS @ US34 & SH37, KERSEY 05/24/07 675.00 15.00 22.00 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 675.00 15.00 22.00 20.00 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 1,030.00 20.00 15.00 14.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,030.00 20.00 15.00 14.50 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 535.00 17.00 18.01 17.00 SHE 082A-010 SH 82 AND BUFFALO VALLEY ROAD 11/29/07 180.00 20.00 48.03 60.38 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 715.00 17.76 21.28 27.92 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,613.00 17.54 17.05 15.79 =============== 613-00306 3 In Elec Cond (Bored) Lin Foot =============================================== SHE 0931-027 SH 93 @ SH 72 01/25/07 720.00 10.00 14.22 18.50 NH 1602-102 WITHIN THE ALAMOSA CITY LIMIT 02/15/07 440.00 11.00 15.00 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,160.00 10.38 14.37 17.17 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 320 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-00306 3 In Elec Cond (Bored) Lin Foot =============================================== IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 340.00 53.75 65.00 65.00 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 1,470.00 11.00 19.25 19.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 550.00 9.00 15.63 11.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,360.00 16.69 22.31 23.88 SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 512.00 30.00 13.20 13.20 ITSSW00-455 VMS REPLACEMENT IN REGIONS 1, 08/30/07 600.00 28.00 30.00 24.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 844.00 35.00 42.38 33.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,956.00 31.54 36.52 25.06 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 528.00 22.00 27.82 26.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 528.00 22.00 27.82 26.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,004.00 20.78 24.90 23.15 =============== 613-00350 3-1/2 In Elec Cond Lin Foot =============================================== IM 0703-326 EISENHOWER JOHNSON MEMORIAL T 12/06/07 3,720.00 77.50 49.93 13.04 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,720.00 77.50 49.93 13.04 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,720.00 77.50 49.93 13.04 =============== 613-00400 4 In Elec Cond Lin Foot =============================================== IM 0703-319 EJMT 24.9 KV SERVICE 01/25/07 650.00 50.00 75.11 69.54 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 650.00 50.00 75.11 69.54 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 1,580.00 13.00 9.71 10.52 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,580.00 13.00 9.71 10.52 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 321 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-00400 4 In Elec Cond Lin Foot =============================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 16,095.00 10.00 15.75 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 16,095.00 10.00 15.75 16.00 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 326.00 15.00 15.05 10.09 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 326.00 15.00 15.05 10.09 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18,651.00 11.74 17.52 17.30 =============== 613-00401 4 In Elec Cond (Jacked) Lin Foot =============================================== ITSSW00-378 VMS REPLACEMENT IN REGIONS 1, 06/21/07 240.00 25.00 136.63 27.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 240.00 25.00 136.63 27.90 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 240.00 25.00 136.63 27.90 =============== 613-00402 Inst 4 In Elec Cond Lin Foot =============================================== ITSSW00-378 VMS REPLACEMENT IN REGIONS 1, 06/21/07 3,160.00 5.00 16.15 11.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,160.00 5.00 16.15 11.45 CC 0821-084 SH82 ASPEN 12/20/07 1,828.00 6.00 13.65 15.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,828.00 6.00 13.65 15.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,988.00 5.37 14.81 12.90 =============== 613-00408 4 In Elec Cond (Bored) Lin Foot =============================================== STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 105.00 50.00 81.38 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 105.00 50.00 81.38 80.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 105.00 50.00 81.38 80.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 322 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-00600 6 In Elec Cond Lin Foot =============================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 1,110.00 20.00 30.14 33.07 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,110.00 20.00 30.14 33.07 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,110.00 20.00 30.14 33.07 =============== 613-01075 3/4 In Elec Cond (P) Lin Foot =============================================== BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 75.00 7.50 6.39 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 75.00 7.50 6.39 6.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 75.00 7.50 6.39 6.00 =============== 613-01100 1 In Elec Cond (P) Lin Foot =============================================== CC 0821-084 SH82 ASPEN 12/20/07 800.00 15.00 18.35 17.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 800.00 15.00 18.35 17.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 800.00 15.00 18.35 17.60 =============== 613-01125 1-1/4 In Elec Cond (P) Lin Foot =============================================== NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 20.00 5.00 22.53 23.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 5.00 22.53 23.00 IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 7,400.00 15.00 8.00 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7,400.00 15.00 8.00 8.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,420.00 14.97 8.12 8.04 =============== 613-01150 1-1/2 In Elec Cond (P) Lin Foot =============================================== IM 0703-336 WB I-70 AT M.P. 259.70 AND M. 10/18/07 25.00 29.25 24.00 29.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 25.00 29.25 24.00 29.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25.00 29.25 24.00 29.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 323 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-01200 2 In Elec Cond (P) Lin Foot =============================================== NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 120.00 9.00 9.84 10.50 NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 212.00 7.50 7.73 8.00 SHE 0931-027 SH 93 @ SH 72 01/25/07 600.00 10.00 7.89 7.00 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 3,438.00 10.00 6.65 6.20 NH 1602-102 WITHIN THE ALAMOSA CITY LIMIT 02/15/07 6,580.00 14.00 9.00 6.50 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 9,380.00 8.00 16.03 15.34 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 250.00 14.00 10.04 10.00 IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 50.00 10.00 37.50 36.50 STA402A-007 SH 402 & I-25 OFFRAMS AND E. 03/22/07 605.00 8.00 7.18 2.36 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 21,235.00 10.32 10.93 10.40 NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 125.00 15.00 66.00 19.00 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 30.00 20.00 29.96 24.85 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 68,125.00 7.00 6.66 7.02 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 3,720.00 16.00 13.50 12.00 CR400-216 SIGNALS @ US34 & SH37, KERSEY 05/24/07 1,900.00 5.00 10.50 9.00 IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 3,700.00 17.50 9.00 9.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 275.00 8.00 14.28 14.50 ITSSW00-378 VMS REPLACEMENT IN REGIONS 1, 06/21/07 6,400.00 13.00 17.15 12.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 84,275.00 8.29 7.69 7.83 SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 70.00 20.00 11.10 11.10 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 1,550.00 13.00 10.39 10.50 ITS SW00-457 DRCOG REGION 08/09/07 2,255.00 22.00 17.28 7.55 BR 0253-192 I-25&128TH 08/16/07 300.00 10.00 9.56 9.40 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 3,700.00 10.00 18.63 19.50 ITSSW00-455 VMS REPLACEMENT IN REGIONS 1, 08/30/07 2,690.00 15.00 19.50 13.00 IM R400-215 I-25 & I-76 VMS INSTALLATION 09/06/07 1,970.00 14.00 9.97 10.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 1,260.00 15.00 15.63 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 13,795.00 14.35 14.95 12.96 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 1,430.00 10.50 9.68 8.40 IM 0703-336 WB I-70 AT M.P. 259.70 AND M. 10/18/07 480.00 9.75 22.25 16.00 STA 340A-013 SH 340 IN FRUITA 10/25/07 2,330.00 12.00 10.69 10.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 324 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-01200 2 In Elec Cond (P) Lin Foot =============================================== C120A-007 ON SH 120 AT PORTLAND OVER TH 11/29/07 620.00 16.00 7.13 4.00 STSR400-229 SH 14, SH 93, & SH 157 IN BOU 12/06/07 261.00 7.50 16.53 28.50 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 445.00 10.00 7.44 7.00 SHE 160A-009 U.S. 160 MP 94.15 - MP 96.63 12/20/07 12,973.00 8.00 14.84 7.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 18,539.00 9.05 13.17 8.59 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 137,844.00 9.31 9.74 8.84 =============== 613-01201 2 In Elec Cond (P) (Spec) Lin Foot =============================================== IM 0702-270 I 70 THROUGH GLENWOOD CANYON 01/11/07 120.00 18.00 38.00 39.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 120.00 18.00 38.00 39.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 120.00 18.00 38.00 39.00 =============== 613-01250 2-1/2 In Elec Cond (P) Lin Foot =============================================== NH 1602-102 WITHIN THE ALAMOSA CITY LIMIT 02/15/07 305.00 15.00 12.80 11.60 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 1,175.00 21.00 18.40 17.71 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,480.00 19.76 17.58 16.45 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 130.00 18.00 15.50 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 130.00 18.00 15.50 14.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,610.00 19.62 17.45 16.25 =============== 613-01300 3 In Elec Cond (P) Lin Foot =============================================== NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 240.00 12.00 11.32 12.00 SHE 0931-027 SH 93 @ SH 72 01/25/07 200.00 10.00 10.39 10.00 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 244.00 20.00 9.17 8.25 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 3,500.00 12.00 14.61 13.82 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 250.00 14.00 11.67 12.40 STA402A-007 SH 402 & I-25 OFFRAMS AND E. 03/22/07 520.00 14.00 9.16 5.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,954.00 12.62 12.70 12.32 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 325 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-01300 3 In Elec Cond (P) Lin Foot =============================================== SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 60.00 20.00 31.46 24.85 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 2,500.00 13.00 8.36 15.04 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 2,140.00 20.00 16.00 15.00 CR400-216 SIGNALS @ US34 & SH37, KERSEY 05/24/07 30.00 15.00 24.00 15.00 IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 8,550.00 14.75 25.50 26.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 250.00 10.00 13.75 8.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 13,530.00 15.19 18.73 21.88 SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 230.00 18.00 13.20 13.20 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 110.00 13.00 15.00 14.50 C0702-273 I-70 GLENWOOD CANYON 08/09/07 2,096.00 4.00 4.00 4.00 BR 0253-192 I-25&128TH 08/16/07 90.00 11.00 14.22 13.60 ITSSW00-455 VMS REPLACEMENT IN REGIONS 1, 08/30/07 2,000.00 18.00 22.00 16.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 2,211.00 18.00 17.63 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6,737.00 13.47 16.69 11.13 STSR400-229 SH 14, SH 93, & SH 157 IN BOU 12/06/07 620.00 10.50 18.36 29.25 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 1,070.00 13.00 8.54 8.00 CC 0821-084 SH82 ASPEN 12/20/07 120.00 20.00 35.83 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,810.00 12.61 13.43 16.21 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 27,031.00 14.12 16.14 17.07 =============== 613-01400 4 In Elec Cond (P) Lin Foot =============================================== STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 414.00 20.00 21.13 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 414.00 20.00 21.13 16.00 STA 340A-013 SH 340 IN FRUITA 10/25/07 1,350.00 18.00 13.91 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,350.00 18.00 13.91 14.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,764.00 18.47 15.61 14.47 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 326 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-01800 8 In Elec Cond (P) Lin Foot =============================================== C0702-273 I-70 GLENWOOD CANYON 08/09/07 1,048.00 15.00 10.00 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,048.00 15.00 10.00 10.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,048.00 15.00 10.00 10.00 =============== 613-04020 Hanger System LUMP SUM =============================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 1.00 80000.00 86397.60 87691.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 80000.00 86397.60 87691.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 80000.00 86397.60 87691.50 =============== 613-05000 Dir Burial Cable Lin Foot =============================================== IM 0703-319 EJMT 24.9 KV SERVICE 01/25/07 8,700.00 10.00 11.21 7.54 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8,700.00 10.00 11.21 7.54 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,700.00 10.00 11.21 7.54 =============== 613-05001 Inst Dir Burial Cable Lin Foot =============================================== SHE 160A-009 U.S. 160 MP 94.15 - MP 96.63 12/20/07 12,486.00 5.00 19.73 6.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 12,486.00 5.00 19.73 6.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12,486.00 5.00 19.73 6.80 =============== 613-07000 Pull Box (Spec) Each =================================================== NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 8.00 375.00 306.88 309.00 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 16.00 450.00 282.15 255.00 NH 1602-102 WITHIN THE ALAMOSA CITY LIMIT 02/15/07 6.00 300.00 612.50 915.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 20.00 430.00 784.20 750.60 IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 7.00 375.00 374.95 365.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 57.00 407.46 425.11 519.46 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 327 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-07000 Pull Box (Spec) Each =================================================== STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 5.00 600.00 571.67 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 600.00 571.67 500.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 4.00 600.00 2156.11 2194.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 600.00 2156.11 2194.50 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 2.00 500.00 1147.78 1070.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 500.00 1147.78 1070.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 68.00 435.66 546.77 632.75 =============== 613-07017 Pull Box (16"x14"x6") Each =================================================== NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 2.00 600.00 323.08 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 600.00 323.08 350.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 600.00 323.08 350.00 =============== 613-07018 Pull Box (18"x12"x8") Each =================================================== IM 0703-326 EISENHOWER JOHNSON MEMORIAL T 12/06/07 24.00 1100.00 567.11 576.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 24.00 1100.00 567.11 576.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 24.00 1100.00 567.11 576.00 =============== 613-07023 Pull Box (24"x36"x24") Each =================================================== SHE 0931-027 SH 93 @ SH 72 01/25/07 3.00 640.00 785.24 750.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 328 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-07023 Pull Box (24"x36"x24") Each =================================================== NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 22.00 880.00 546.25 475.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 25.00 851.20 567.46 508.00 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 2.00 1000.00 737.25 575.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 1000.00 737.25 575.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 27.00 862.22 575.14 512.96 =============== 613-07026 Pull Box (16"x24"x12") Each =================================================== NH 1602-102 WITHIN THE ALAMOSA CITY LIMIT 02/15/07 12.00 600.00 568.50 837.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12.00 600.00 568.50 837.00 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 4.00 400.00 579.35 302.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 400.00 579.35 302.40 SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 1.00 600.00 427.00 427.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 600.00 427.00 427.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17.00 552.94 569.28 687.09 =============== 613-07034 Pull Box (24"x36"x18") Each =================================================== SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 4.00 800.00 505.72 475.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 800.00 505.72 475.00 STA 0703-312 I-70 HIDDEN VALLEY AND FALL R 05/17/07 8.00 726.21 1322.00 1322.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 329 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-07034 Pull Box (24"x36"x18") Each =================================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 17.00 900.00 1110.89 1052.56 IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 5.00 800.00 1500.00 1500.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 4.00 800.00 876.00 825.00 ITSSW00-378 VMS REPLACEMENT IN REGIONS 1, 06/21/07 21.00 1000.00 929.12 1092.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 55.00 896.54 1056.91 1131.07 SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 3.00 750.00 510.00 510.00 ITS SW00-457 DRCOG REGION 08/09/07 15.00 800.00 1087.85 1025.70 ITSSW00-455 VMS REPLACEMENT IN REGIONS 1, 08/30/07 30.00 1000.00 862.50 860.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 48.00 921.88 923.82 889.91 IM 0703-336 WB I-70 AT M.P. 259.70 AND M. 10/18/07 4.00 830.50 862.50 750.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 4.00 615.50 720.78 400.00 C120A-007 ON SH 120 AT PORTLAND OVER TH 11/29/07 2.00 800.00 453.40 275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 738.40 723.08 515.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 117.00 890.12 905.14 957.05 =============== 613-07038 Pull Box (36"x48"x18") Each =================================================== SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 1.00 1000.00 805.76 800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1000.00 805.76 800.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 3.00 800.00 1560.00 2200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 800.00 1560.00 2200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 850.00 1163.03 1850.00 =============== 613-07040 Pull Box (30"x48"x24") Each =================================================== SHE 0931-027 SH 93 @ SH 72 01/25/07 1.00 900.00 1080.25 1040.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 900.00 1080.25 1040.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 900.00 1080.25 1040.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 330 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-07050 Pull Box (13"x24"x18") Deep Each =================================================== IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 22.00 600.00 725.00 750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 22.00 600.00 725.00 750.00 IM R400-215 I-25 & I-76 VMS INSTALLATION 09/06/07 11.00 600.00 608.60 650.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 11.00 600.00 608.60 650.00 IM 0703-336 WB I-70 AT M.P. 259.70 AND M. 10/18/07 17.00 715.00 602.50 550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 17.00 715.00 602.50 550.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 639.10 636.78 660.00 =============== 613-07060 Pull Box (18"x30"x18") Deep Each =================================================== NH 1602-102 WITHIN THE ALAMOSA CITY LIMIT 02/15/07 6.00 500.00 708.00 966.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 500.00 708.00 966.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 500.00 708.00 966.00 =============== 613-07192 Pull Box (36"x12"x12") Each =================================================== IM 0703-326 EISENHOWER JOHNSON MEMORIAL T 12/06/07 10.00 2125.00 1100.16 1040.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 2125.00 1100.16 1040.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 2125.00 1100.16 1040.00 =============== 613-10000 Wiring LUMP SUM =============================================== NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 1.00 1000.00 1368.33 1500.00 IM 0703-319 EJMT 24.9 KV SERVICE 01/25/07 1.00 325000.00 268194.75 135080.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 331 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-10000 Wiring LUMP SUM =============================================== NH 1602-102 WITHIN THE ALAMOSA CITY LIMIT 02/15/07 1.00 15000.00 13935.00 17270.00 SHE 1151-020 SH 115 VMS, MP 17 AND MP 41 02/15/07 1.00 5000.00 6714.78 5125.68 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 1.00 5000.00 4845.83 4200.00 STA402A-007 SH 402 & I-25 OFFRAMS AND E. 03/22/07 1.00 7500.00 20385.50 12423.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 59750.00 35958.87 29266.45 NH 0405-025 KIT CARSON BRIDGE 04/26/07 1.00 12583.72 2283.28 2300.00 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 1.00 7000.00 9115.50 9612.00 STA 0703-312 I-70 HIDDEN VALLEY AND FALL R 05/17/07 1.00 14912.32 5400.00 5400.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 1.00 15000.00 120579.57 100242.26 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 1.00 6000.00 6250.00 5500.00 CR400-216 SIGNALS @ US34 & SH37, KERSEY 05/24/07 1.00 6500.00 8030.00 7860.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 1.00 2500.00 6523.74 6300.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 1.00 10000.00 9831.33 8550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 9312.01 25727.60 18220.53 SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 1.00 4400.00 5800.00 5800.00 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 1.00 5000.00 5146.21 5000.00 BR 0253-192 I-25&128TH 08/16/07 1.00 30000.00 7784.90 8400.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 1.00 150000.00 153241.38 155933.50 ITSSW00-455 VMS REPLACEMENT IN REGIONS 1, 08/30/07 1.00 25000.00 55732.00 18800.00 IM R400-215 I-25 & I-76 VMS INSTALLATION 09/06/07 1.00 6500.00 11782.80 12900.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 1.00 95000.00 8371.13 4500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7.00 45128.57 34126.29 30190.50 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 1.00 13500.00 6118.08 6000.00 STA 340A-013 SH 340 IN FRUITA 10/25/07 1.00 17000.00 8487.50 10300.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 1.00 8716.75 6010.94 5200.00 SHE 082A-010 SH 82 AND BUFFALO VALLEY ROAD 11/29/07 1.00 5000.00 18335.00 7760.00 C120A-007 ON SH 120 AT PORTLAND OVER TH 11/29/07 1.00 12000.00 4136.50 2500.00 STSR400-229 SH 14, SH 93, & SH 157 IN BOU 12/06/07 1.00 20000.00 26668.20 35618.00 IM 0703-326 EISENHOWER JOHNSON MEMORIAL T 12/06/07 1.00 420800.00 432617.75 200900.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 1.00 10000.00 7336.69 6850.00 CC 0821-084 SH82 ASPEN 12/20/07 1.00 5000.00 9548.33 3850.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9.00 56890.75 34739.74 30997.56 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 42030.43 33204.04 27055.81 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 332 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-10010 Wiring (Spec) LUMP SUM =============================================== IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 1.00 10000.00 5250.00 5500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 10000.00 5250.00 5500.00 IM 0703-336 WB I-70 AT M.P. 259.70 AND M. 10/18/07 1.00 5000.00 74295.50 10000.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 1.00 7000.00 7335.02 6850.00 SHE 160A-009 U.S. 160 MP 94.15 - MP 96.63 12/20/07 1.00 100000.00 49199.09 23391.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 37333.33 38427.75 13413.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 30500.00 34280.53 11435.25 =============== 613-15100 Recessed Light Each =================================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 22.00 800.00 2278.88 2313.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 22.00 800.00 2278.88 2313.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 22.00 800.00 2278.88 2313.00 =============== 613-16000 Luminaire (Spec) Each =================================================== IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 1.00 1800.00 2246.72 2200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1800.00 2246.72 2200.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 14.00 1500.00 1761.22 982.37 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 14.00 1500.00 1761.22 982.37 BR 0253-192 I-25&128TH 08/16/07 2.00 2200.00 1774.33 1400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 2200.00 1774.33 1400.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 333 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-16000 Luminaire (Spec) Each =================================================== BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 8.00 800.00 763.72 710.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8.00 800.00 763.72 710.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25.00 1344.00 1387.58 977.33 =============== 613-16010 Light Std + Lumin (Dec) Each =================================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 64.00 4000.00 7235.14 7363.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 64.00 4000.00 7235.14 7363.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 64.00 4000.00 7235.14 7363.50 =============== 613-16020 Luminaire (Spec) Ind (165 Watt) Each =================================================== NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 1.00 1500.00 1531.33 1600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1500.00 1531.33 1600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1500.00 1531.33 1600.00 =============== 613-16025 Luminaire (Spec) (LED) (Step Light) Each =================================================== BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 30.00 500.00 613.69 570.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 30.00 500.00 613.69 570.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 500.00 613.69 570.00 =============== 613-30005 Light Std + Lumin (Pedest) Each =================================================== STA 340A-013 SH 340 IN FRUITA 10/25/07 13.00 4500.00 2352.50 1800.00 CC 0821-084 SH82 ASPEN 12/20/07 4.00 6000.00 4860.00 3960.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 17.00 4852.94 3144.34 2308.24 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17.00 4852.94 3144.34 2308.24 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 334 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-30400 Light Std Alum (40 Ft) Each =================================================== NH 0405-025 KIT CARSON BRIDGE 04/26/07 6.00 2139.95 2780.04 2800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 2139.95 2780.04 2800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 2139.95 2780.04 2800.00 =============== 613-32250 Light Std Steel (25 Ft) Each =================================================== SHE 160A-009 U.S. 160 MP 94.15 - MP 96.63 12/20/07 12.00 3000.00 3885.16 4831.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 12.00 3000.00 3885.16 4831.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 3000.00 3885.16 4831.00 =============== 613-32350 Light Std Steel (35 Ft) Each =================================================== STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 6.00 3000.00 3618.33 2125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 3000.00 3618.33 2125.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 3000.00 3618.33 2125.00 =============== 613-32400 Light Std Steel (40 Ft) Each =================================================== NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 6.00 3200.00 5643.23 5389.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 3200.00 5643.23 5389.20 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 5.00 3500.00 6250.00 5500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 3500.00 6250.00 5500.00 STA 340A-013 SH 340 IN FRUITA 10/25/07 9.00 3100.00 3591.25 3350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9.00 3100.00 3591.25 3350.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 3230.00 4583.80 4499.26 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 335 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-34250 Light Std Metal (25 Ft) Each =================================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 7.00 2500.00 3501.47 4079.86 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7.00 2500.00 3501.47 4079.86 BR 0253-192 I-25&128TH 08/16/07 2.00 3200.00 3104.60 2900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 3200.00 3104.60 2900.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 2655.56 3397.03 3817.67 =============== 613-34300 Light Std Metal (30 Ft) Each =================================================== BR 0253-192 I-25&128TH 08/16/07 4.00 2800.00 3687.19 3385.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 2800.00 3687.19 3385.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 2.00 3011.00 3592.24 3200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 3011.00 3592.24 3200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 2870.33 3644.99 3323.33 =============== 613-34350 Light Std Metal (35 Ft) Each =================================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 26.00 3000.00 3491.22 4079.86 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 26.00 3000.00 3491.22 4079.86 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26.00 3000.00 3491.22 4079.86 =============== 613-34400 Light Std Metal (40 Ft) Each =================================================== NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 1.00 3000.00 3423.67 3500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 3000.00 3423.67 3500.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 336 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-34400 Light Std Metal (40 Ft) Each =================================================== IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 3.00 3500.00 3616.34 3500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 3500.00 3616.34 3500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 3375.00 3577.80 3500.00 =============== 613-40000 Conc Foundation Pad Each =================================================== NH 0405-025 KIT CARSON BRIDGE 04/26/07 14.00 751.97 817.60 830.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 6.00 800.00 817.45 741.79 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 3.00 1000.00 1304.13 1400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 23.00 796.85 881.02 881.34 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 2.00 1000.00 1500.00 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 1000.00 1500.00 2000.00 STA 340A-013 SH 340 IN FRUITA 10/25/07 13.00 650.00 848.75 770.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 13.00 650.00 848.75 770.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 38.00 757.30 886.41 902.12 =============== 613-40010 Light Std Foundation Each =================================================== NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 1.00 1200.00 1003.00 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1200.00 1003.00 1100.00 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 2.00 800.00 968.20 982.80 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 337 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-40010 Light Std Foundation Each =================================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 33.00 9000.00 694.68 501.22 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 6.00 850.00 1156.67 860.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 41.00 7407.32 761.16 577.22 BR 0253-192 I-25&128TH 08/16/07 4.00 800.00 733.90 785.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 36.00 1000.00 1691.36 1708.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 4.00 800.00 1804.13 1600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 44.00 963.64 1595.00 1614.27 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 2.00 1229.75 1258.44 1000.00 CC 0821-084 SH82 ASPEN 12/20/07 4.00 800.00 1058.33 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 943.25 1138.38 1066.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 92.00 3836.52 1196.61 1110.80 =============== 613-40012 Light Std Foundation Spec Each =================================================== STA 340A-013 SH 340 IN FRUITA 10/25/07 13.00 600.00 905.00 875.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 4.00 1200.00 460.00 430.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 17.00 741.18 764.47 770.29 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17.00 741.18 764.47 770.29 =============== 613-50060 Port Power Generator Each =================================================== BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 2.00 7500.00 9416.54 2700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 7500.00 9416.54 2700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 7500.00 9416.54 2700.00 =============== 613-50100 Lighting Ctrl Center Each =================================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 6.00 5000.00 3839.19 3408.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 5000.00 3839.19 3408.25 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 338 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-50100 Lighting Ctrl Center Each =================================================== BR 0253-192 I-25&128TH 08/16/07 1.00 7500.00 4798.69 8100.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 2.00 7000.00 11006.70 11229.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 7166.67 8619.00 10186.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 3.00 7000.00 6551.21 6070.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 7000.00 6551.21 6070.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 6041.67 5856.53 5768.13 =============== 613-50210 Temporary Lighting LUMP SUM =============================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 1.00 500000.00 31438.76 64155.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 500000.00 31438.76 64155.05 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 500000.00 31438.76 64155.05 =============== 613-50225 Interior Lighting (Conc Box) Each =================================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 142.00 200.00 508.87 516.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 142.00 200.00 508.87 516.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 142.00 200.00 508.87 516.50 =============== 613-50365 Transformer Base Each =================================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 24.00 750.00 575.53 676.62 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 24.00 750.00 575.53 676.62 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 24.00 750.00 575.53 676.62 =============== 613-50410 Light Std (Temp) Each =================================================== IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 5.00 5000.00 4744.17 4600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 5000.00 4744.17 4600.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 339 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-50410 Light Std (Temp) Each =================================================== BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 6.00 4500.00 3486.80 3835.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 4500.00 3486.80 3835.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 4727.27 3892.41 4182.78 =============== 613-70150 Lumin HPS (150 W) Each =================================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 18.00 1500.00 1827.87 403.98 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 18.00 1500.00 1827.87 403.98 BR 0253-192 I-25&128TH 08/16/07 4.00 500.00 3710.96 3335.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 500.00 3710.96 3335.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 4.00 450.00 1282.98 1210.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 450.00 1282.98 1210.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26.00 1184.62 2039.80 978.91 =============== 613-70250 Lumin HPS (250 W) Each =================================================== SHE 0931-027 SH 93 @ SH 72 01/25/07 4.00 450.00 451.35 500.00 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 4.00 800.00 486.63 475.00 STA402A-007 SH 402 & I-25 OFFRAMS AND E. 03/22/07 10.00 450.00 398.50 334.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 18.00 527.78 440.64 402.22 NH 0405-025 KIT CARSON BRIDGE 04/26/07 6.00 421.35 491.06 500.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 340 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-70250 Lumin HPS (250 W) Each =================================================== SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 10.00 400.00 566.50 486.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 32.00 800.00 476.52 441.06 CR400-216 SIGNALS @ US34 & SH37, KERSEY 05/24/07 4.00 450.00 480.00 430.00 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 8.00 500.00 460.00 400.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 10.00 550.00 563.33 370.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 70.00 620.40 499.62 437.06 BR 0253-192 I-25&128TH 08/16/07 6.00 500.00 383.83 420.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 500.00 383.83 420.00 STSR400-229 SH 14, SH 93, & SH 157 IN BOU 12/06/07 4.00 430.00 397.40 485.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 430.00 397.40 485.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 98.00 588.25 472.53 431.57 =============== 613-70400 Lumin HPS (400 W) Each =================================================== NH 1602-102 WITHIN THE ALAMOSA CITY LIMIT 02/15/07 2.00 800.00 523.00 626.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 35.00 650.00 452.00 432.00 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 2.00 450.00 463.66 489.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 39.00 647.44 456.01 444.90 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 8.00 1500.00 675.00 550.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 3.00 500.00 401.73 380.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 11.00 1227.27 557.88 503.64 SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 3.00 460.00 411.00 411.00 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 4.00 500.00 515.62 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7.00 482.86 501.98 461.86 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 341 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-70400 Lumin HPS (400 W) Each =================================================== C R400-217 SIGNALS @ SH66 & CR13 10/04/07 3.00 500.00 774.74 970.00 STA 340A-013 SH 340 IN FRUITA 10/25/07 9.00 450.00 450.50 390.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 6.00 443.25 497.47 515.00 SHE 082A-010 SH 82 AND BUFFALO VALLEY ROAD 11/29/07 4.00 750.00 746.63 389.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 22.00 509.52 583.53 503.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 79.00 675.18 522.68 470.76 =============== 613-75100 Lumin Metal Halide (100 W) Each =================================================== BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 4.00 750.00 2180.29 2030.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 750.00 2180.29 2030.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 750.00 2180.29 2030.00 =============== 613-76100 Lumin Metal Halide (WT) (100 W) Each =================================================== BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 26.00 800.00 1374.16 1290.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 26.00 800.00 1374.16 1290.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26.00 800.00 1374.16 1290.00 =============== 613-81600 480V Switchgear Each =================================================== IM 0703-326 EISENHOWER JOHNSON MEMORIAL T 12/06/07 2.00 990000.00 948376.48 833750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 990000.00 948376.48 833750.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 990000.00 948376.48 833750.00 =============== 613-81608 1350 A Bus Duct Lin Foot =============================================== IM 0703-326 EISENHOWER JOHNSON MEMORIAL T 12/06/07 120.00 580.00 720.02 795.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 120.00 580.00 720.02 795.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 120.00 580.00 720.02 795.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 342 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-81610 3000 A Bus Duct Lin Foot =============================================== IM 0703-326 EISENHOWER JOHNSON MEMORIAL T 12/06/07 352.00 1960.00 976.43 975.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 352.00 1960.00 976.43 975.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 352.00 1960.00 976.43 975.00 =============== 613-81611 3000 A Bus Duct (Temp) Lin Foot =============================================== IM 0703-326 EISENHOWER JOHNSON MEMORIAL T 12/06/07 60.00 740.00 1098.27 710.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 60.00 740.00 1098.27 710.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 60.00 740.00 1098.27 710.00 =============== 614-00011 Sign Panel (CL I) Sq Foot ================================================ HB 0063-021 US 6: RIFLE TO NEW CASTLE 01/04/07 53.50 20.00 21.92 17.50 STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 105.00 20.00 16.98 18.00 NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 368.00 18.00 17.41 13.00 STA 012A-042 SH 12, S. OF LA VETA 01/18/07 859.00 18.00 18.14 13.00 STA 069A-021 SH 69, W. OF WALSENBURG 01/25/07 254.00 18.00 16.98 17.00 SHE 0931-027 SH 93 @ SH 72 01/25/07 30.00 18.00 21.63 26.00 NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 10.00 25.00 17.75 17.75 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 6.25 20.00 17.93 17.00 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 33.00 20.00 13.71 12.40 NH 1602-102 WITHIN THE ALAMOSA CITY LIMIT 02/15/07 30.00 30.00 42.50 65.00 SHE 1151-020 SH 115 VMS, MP 17 AND MP 41 02/15/07 9.00 20.00 30.18 16.32 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 1,506.00 11.00 14.93 14.04 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 81.30 20.00 23.24 30.75 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 129.13 18.00 20.15 14.70 SHE 1151-018 SH 115 - GUMAER AVENUE EAST 03/08/07 48.40 18.00 25.19 22.90 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 142.00 20.00 14.84 15.50 STA0091-030 SH 9 BETWEEN FAIRPLAY AND ALM 03/22/07 9.00 18.00 21.36 32.50 IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 18.00 18.00 17.93 13.00 SHE 0504-050 INTERSECTION OF SH 50B AND SH 03/22/07 73.50 20.00 19.68 23.75 STA402A-007 SH 402 & I-25 OFFRAMS AND E. 03/22/07 127.50 20.00 19.98 17.43 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,892.58 15.73 17.69 15.42 SHE 165A-011 ALONG SH 165 N/O RYE 04/05/07 238.25 18.00 17.73 16.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 343 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00011 Sign Panel (CL I) Sq Foot ================================================ HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 15.00 20.48 18.20 20.00 NH 030A-025 SH30 (HAVANA)- PARKER TO FLOR 04/19/07 38.00 15.00 21.95 14.00 NH 0405-025 KIT CARSON BRIDGE 04/26/07 50.00 17.55 17.21 20.00 STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 90.00 20.16 24.13 41.65 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 5.00 25.00 39.18 77.70 STA 0703-312 I-70 HIDDEN VALLEY AND FALL R 05/17/07 12.00 23.65 31.00 31.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 556.00 16.00 17.58 15.80 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 41.00 20.00 57.50 55.00 CR400-216 SIGNALS @ US34 & SH37, KERSEY 05/24/07 67.00 25.00 30.00 31.00 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 34.00 18.00 20.00 19.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 37.00 18.00 19.83 18.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,183.25 17.69 19.76 20.79 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 61.00 20.00 19.00 24.80 SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 78.50 20.00 20.25 20.25 BR 0253-192 I-25&128TH 08/16/07 12.00 18.00 23.63 25.50 CR100-126 WEST OF KIT CARSON 08/16/07 97.00 20.87 23.38 19.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 118.00 20.00 7.17 7.00 ITSSW00-455 VMS REPLACEMENT IN REGIONS 1, 08/30/07 48.00 19.00 25.00 24.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 105.00 15.00 22.63 33.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 519.50 19.01 18.30 20.59 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 27.00 24.00 24.87 21.00 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 1.50 20.00 78.75 20.00 SHE0092-019 SH 9 NORTH OF SILVERTHORNE, I 10/18/07 4.00 26.00 24.63 20.15 STA 340A-013 SH 340 IN FRUITA 10/25/07 341.00 20.00 13.01 13.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 413.00 13.50 18.65 19.00 SHE 082A-010 SH 82 AND BUFFALO VALLEY ROAD 11/29/07 49.00 30.00 28.13 40.00 C120A-007 ON SH 120 AT PORTLAND OVER TH 11/29/07 93.00 20.00 22.77 30.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 18.00 18.00 18.18 20.00 CC 0821-084 SH82 ASPEN 12/20/07 207.00 20.00 14.70 13.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,153.50 18.18 17.65 18.03 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,748.83 16.74 18.02 17.20 =============== 614-00012 Sign Panel (CL II) Sq Foot ================================================ IM 0702-269 I 70 IN EAGLE COUNTY 01/11/07 53.00 25.00 26.50 18.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 344 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00012 Sign Panel (CL II) Sq Foot ================================================ STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 115.00 22.00 18.74 19.00 NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 46.00 20.00 21.48 17.00 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 96.00 21.50 22.35 30.00 STA 069A-021 SH 69, W. OF WALSENBURG 01/25/07 51.00 25.00 19.00 19.00 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 30.00 22.00 23.52 19.00 NH 0402-070 US 40 ROUTT COUNTY 02/08/07 84.00 30.00 30.50 28.00 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 180.00 20.00 16.55 15.50 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 128.00 13.00 18.43 17.28 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 337.89 20.00 18.14 18.30 SHE 1151-018 SH 115 - GUMAER AVENUE EAST 03/08/07 33.00 22.00 31.97 25.50 STA0091-030 SH 9 BETWEEN FAIRPLAY AND ALM 03/22/07 9.00 18.00 25.22 37.70 IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 289.00 20.00 19.08 16.70 SHE 0504-050 INTERSECTION OF SH 50B AND SH 03/22/07 58.00 22.00 20.37 20.54 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,509.89 20.70 19.31 19.26 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 18.00 22.16 23.43 24.00 NH 0405-025 KIT CARSON BRIDGE 04/26/07 39.50 21.29 19.24 20.00 STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 24.00 19.29 27.70 44.50 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 12.00 22.00 39.23 62.90 STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 120.00 20.29 17.48 17.05 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 796.00 18.00 20.70 17.79 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 96.00 20.00 18.36 19.50 NH 3851-016 US 385 NORTH OF BURLINGTON 05/24/07 42.00 24.56 28.05 25.15 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 27.00 28.00 40.00 30.00 IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 478.00 20.75 21.00 22.00 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 56.00 20.00 26.22 26.00 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 18.00 25.00 26.67 24.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 61.00 20.00 29.07 29.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,787.50 19.66 21.49 20.79 SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 7.50 22.00 24.20 24.20 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 238.00 21.00 19.87 18.00 BR 0253-192 I-25&128TH 08/16/07 72.00 20.00 24.97 26.00 CR100-126 WEST OF KIT CARSON 08/16/07 26.00 23.88 31.27 22.00 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 16.00 30.00 21.67 30.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 12.00 30.00 10.19 10.00 IM 0703-331 WB I-70 AT M.P. 259.70 AND M. 09/06/07 192.00 20.00 21.14 15.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 563.50 21.12 21.31 18.59 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 32.00 25.00 24.53 24.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 345 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00012 Sign Panel (CL II) Sq Foot ================================================ SHE0092-019 SH 9 NORTH OF SILVERTHORNE, I 10/18/07 111.00 21.00 25.63 20.15 STA 340A-013 SH 340 IN FRUITA 10/25/07 46.00 20.00 18.18 19.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 186.00 19.00 21.87 19.00 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 9.00 25.00 29.25 21.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 224.00 18.00 21.77 23.25 CC 0821-084 SH82 ASPEN 12/20/07 145.00 30.00 21.52 17.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 753.00 21.50 22.34 20.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,613.89 20.48 20.75 19.96 =============== 614-00013 Sign Panel (CL III) Sq Foot ================================================ NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 175.00 22.00 19.85 18.60 NH 1602-102 WITHIN THE ALAMOSA CITY LIMIT 02/15/07 9.00 40.00 35.00 45.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 54.00 32.00 22.87 21.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 238.00 24.95 20.39 20.28 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 1,962.00 20.00 26.18 19.20 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 130.00 22.00 21.38 23.00 IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 120.00 26.00 22.50 23.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,212.00 20.44 25.59 19.63 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 24.00 30.00 31.18 28.00 BR 0253-192 I-25&128TH 08/16/07 150.00 22.00 26.34 27.00 IM 0703-331 WB I-70 AT M.P. 259.70 AND M. 09/06/07 180.00 22.00 25.47 17.66 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 354.00 22.54 26.31 22.32 SHE0092-019 SH 9 NORTH OF SILVERTHORNE, I 10/18/07 128.00 25.25 27.45 22.25 STA 340A-013 SH 340 IN FRUITA 10/25/07 136.00 20.00 23.38 23.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 72.00 29.00 26.83 31.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 112.00 20.00 24.35 25.53 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 448.00 22.95 25.53 24.70 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,252.00 21.35 25.16 20.67 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 346 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00028 Inst Sign Panel (CL III) Sq Foot ================================================ CR600-285 VARIOUS LOCATIONS IN REGION 6 06/28/07 1,681.00 9.00 10.33 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,681.00 9.00 10.33 8.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,681.00 9.00 10.33 8.00 =============== 614-00029 Inst Sign Panel (CL II) Each =================================================== IM 0702-270 I 70 THROUGH GLENWOOD CANYON 01/11/07 6.00 40.00 46.33 67.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 40.00 46.33 67.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 40.00 46.33 67.00 =============== 614-00035 Sign Panel (Spec) Sq Foot ================================================ SHE 5502-054 02/22/07 24.00 100.00 47.82 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 24.00 100.00 47.82 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 24.00 100.00 47.82 50.00 =============== 614-00042 Inst Sign Post Lin Foot =============================================== IM 0702-270 I 70 THROUGH GLENWOOD CANYON 01/11/07 72.00 12.00 18.83 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 72.00 12.00 18.83 13.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 72.00 12.00 18.83 13.00 =============== 614-00066 Timber Sign Post (6x6 In) Lin Foot =============================================== SHE 5502-054 02/22/07 18.00 22.00 35.24 27.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 18.00 22.00 35.24 27.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18.00 22.00 35.24 27.00 =============== 614-00200 Steel Sign Post (U-2) Lin Foot =============================================== HB 0063-021 US 6: RIFLE TO NEW CASTLE 01/04/07 38.00 5.00 9.64 5.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 38.00 5.00 9.64 5.85 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 347 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00200 Steel Sign Post (U-2) Lin Foot =============================================== STA 0703-312 I-70 HIDDEN VALLEY AND FALL R 05/17/07 22.00 10.55 14.00 14.00 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 10.00 20.00 15.00 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 32.00 13.50 14.48 15.88 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 9.00 15.00 14.54 13.00 ITSSW00-455 VMS REPLACEMENT IN REGIONS 1, 08/30/07 77.00 6.00 11.00 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 86.00 6.94 11.80 10.31 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 8.00 12.00 12.00 10.00 CC 0821-084 SH82 ASPEN 12/20/07 13.00 20.00 9.52 15.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 21.00 16.95 10.24 13.34 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 177.00 8.90 10.85 10.72 =============== 614-00214 Steel Sign Post (1.75x1.75 In T) Lin Foot =============================================== BR 0253-192 I-25&128TH 08/16/07 148.00 13.00 17.55 19.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 148.00 13.00 17.55 19.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 148.00 13.00 17.55 19.00 =============== 614-00220 Steel Sign Post (2.5x2.5 In T) Lin Foot =============================================== SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 20.00 24.00 26.01 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20.00 24.00 26.01 16.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 24.00 26.01 16.00 =============== 614-00612 Steel Sign Post (W 6x12) Lin Foot =============================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 62.00 32.00 27.16 31.62 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 348 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00612 Steel Sign Post (W 6x12) Lin Foot =============================================== IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 112.00 32.35 37.50 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 174.00 32.23 32.06 37.01 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 174.00 32.23 32.06 37.01 =============== 614-00615 Steel Sign Post (W 6x15) Lin Foot =============================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 69.00 37.00 32.52 34.57 IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 52.00 36.25 39.00 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 121.00 36.68 34.29 36.90 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 35.00 40.00 118.91 105.00 IM 0703-331 WB I-70 AT M.P. 259.70 AND M. 09/06/07 140.00 35.00 39.81 32.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 175.00 36.00 58.65 46.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 296.00 36.28 50.35 42.64 =============== 614-00818 Steel Sign Post (W 8x18) Lin Foot =============================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 41.00 40.00 38.75 41.49 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 31.00 48.00 46.45 49.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 72.00 43.44 43.14 44.72 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 72.00 43.44 43.14 44.72 =============== 614-01022 Steel Sign Post (W 10x22) Lin Foot =============================================== IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 41.00 55.00 54.00 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 41.00 55.00 54.00 50.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 52.00 55.00 67.26 77.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 52.00 55.00 67.26 77.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 93.00 55.00 64.50 65.10 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 349 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01502 Steel Sign Supp (2-In Rd)(Po&Sock) Lin Foot =============================================== STA 012A-042 SH 12, S. OF LA VETA 01/18/07 153.00 13.00 14.25 11.00 STA 069A-021 SH 69, W. OF WALSENBURG 01/25/07 153.00 23.00 11.40 12.00 SHE 1151-018 SH 115 - GUMAER AVENUE EAST 03/08/07 30.00 30.00 33.20 36.30 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 273.00 22.00 12.05 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 609.00 20.38 13.67 11.60 SHE 165A-011 ALONG SH 165 N/O RYE 04/05/07 278.00 20.00 14.01 21.00 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 42.00 15.00 16.33 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 320.00 19.34 14.25 19.56 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 108.00 30.00 21.15 19.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 108.00 30.00 21.15 19.00 CC 0821-084 SH82 ASPEN 12/20/07 58.00 23.00 11.47 15.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 58.00 23.00 11.47 15.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,095.00 21.17 14.40 14.86 =============== 614-01503 Steel Sign Supp (2-In Rd)(Po&Sock) Each =================================================== NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 104.00 210.00 89.47 86.40 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 9.00 75.00 208.38 320.00 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 21.00 250.00 112.67 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 134.00 207.20 112.08 105.79 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 61.00 130.00 133.92 148.19 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 61.00 130.00 133.92 148.19 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 350 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01503 Steel Sign Supp (2-In Rd)(Po&Sock) Each =================================================== SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 1.00 230.00 60.00 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 230.00 60.00 60.00 STA 340A-013 SH 340 IN FRUITA 10/25/07 48.00 135.00 180.21 210.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 48.00 135.00 180.21 210.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 244.00 173.79 129.89 136.70 =============== 614-01512 Steel Sign Supp (2-In Rd)(Post) Lin Foot =============================================== STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 62.00 13.00 12.13 13.00 STA 012A-042 SH 12, S. OF LA VETA 01/18/07 1,636.00 12.00 10.73 5.10 STA 069A-021 SH 69, W. OF WALSENBURG 01/25/07 250.00 15.00 6.83 8.00 NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 36.00 15.00 16.65 16.65 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 10.50 12.00 14.82 14.00 NH 1602-102 WITHIN THE ALAMOSA CITY LIMIT 02/15/07 14.00 20.00 21.50 28.00 STA0091-030 SH 9 BETWEEN FAIRPLAY AND ALM 03/22/07 33.00 20.00 10.67 11.00 STA402A-007 SH 402 & I-25 OFFRAMS AND E. 03/22/07 77.00 12.00 15.15 20.59 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,118.50 12.61 10.63 6.72 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 32.00 11.52 11.09 13.00 NH 0405-025 KIT CARSON BRIDGE 04/26/07 89.00 12.39 4.42 5.00 STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 165.00 11.77 11.30 10.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 286.00 11.93 9.52 8.95 CR100-126 WEST OF KIT CARSON 08/16/07 220.00 10.53 15.53 7.75 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 103.00 15.00 9.31 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 323.00 11.96 13.54 8.15 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 351 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01512 Steel Sign Supp (2-In Rd)(Post) Lin Foot =============================================== STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 404.00 13.00 13.33 19.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 404.00 13.00 13.33 19.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,131.50 12.53 11.24 8.66 =============== 614-01522 Steel Sign Supp (2-In Rd)(Sock) Each =================================================== STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 7.00 75.00 69.08 39.00 NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 4.00 70.00 250.00 250.00 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 1.00 50.00 63.31 75.00 NH 1602-102 WITHIN THE ALAMOSA CITY LIMIT 02/15/07 1.00 100.00 236.00 222.00 STA0091-030 SH 9 BETWEEN FAIRPLAY AND ALM 03/22/07 3.00 105.00 85.68 95.90 STA402A-007 SH 402 & I-25 OFFRAMS AND E. 03/22/07 7.00 70.00 98.16 58.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 23.00 76.52 90.59 98.62 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 3.00 75.79 96.35 80.00 NH 0405-025 KIT CARSON BRIDGE 04/26/07 11.00 73.51 19.44 20.00 STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 16.00 62.55 88.01 129.80 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 10.50 25.00 135.00 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 40.50 56.77 76.83 73.01 CR100-126 WEST OF KIT CARSON 08/16/07 22.00 58.48 102.43 85.00 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 2.00 100.00 69.17 55.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 11.00 50.00 102.13 101.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 35.00 58.19 101.35 88.31 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 39.00 80.00 96.88 92.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 39.00 80.00 96.88 92.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 137.50 67.02 92.19 86.57 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 352 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01572 Steel Sign Supp (2-1/2 Rd NP40)(Po&Silp) Lin Foot =============================================== SHE 0504-050 INTERSECTION OF SH 50B AND SH 03/22/07 114.00 38.00 34.00 24.02 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 114.00 38.00 34.00 24.02 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 114.00 38.00 34.00 24.02 =============== 614-01575 Steel Sign Supp (2-1/2 In Rd NP40)(Po) Lin Foot =============================================== STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 166.00 28.00 21.30 17.50 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 12.00 30.00 23.45 30.00 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 214.00 17.00 29.57 29.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 392.00 22.06 26.88 24.16 STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 60.00 24.34 27.50 19.20 NH 3851-016 US 385 NORTH OF BURLINGTON 05/24/07 46.00 26.34 30.38 25.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 106.00 25.21 29.04 21.78 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 56.00 35.00 18.36 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 56.00 35.00 18.36 18.00 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 13.00 24.00 30.98 20.00 SHE 082A-010 SH 82 AND BUFFALO VALLEY ROAD 11/29/07 12.00 14.35 25.64 13.31 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 25.00 19.37 28.94 16.79 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 579.00 23.77 26.59 22.81 =============== 614-01578 Steel Sign Supp (2-1/2 In Rd NP40)(Slip) Each =================================================== STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 16.00 60.00 198.33 220.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 353 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01578 Steel Sign Supp (2-1/2 In Rd NP40)(Slip) Each =================================================== NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 1.00 50.00 218.00 160.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 17.00 59.41 199.31 216.47 STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 5.00 266.47 221.50 208.00 NH 3851-016 US 385 NORTH OF BURLINGTON 05/24/07 4.00 216.47 345.00 335.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 9.00 244.25 288.86 264.44 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 5.00 250.00 224.38 222.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 250.00 224.38 222.00 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 1.00 200.00 313.56 310.00 SHE 082A-010 SH 82 AND BUFFALO VALLEY ROAD 11/29/07 1.00 150.00 279.25 223.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 175.00 299.84 266.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 33.00 145.70 222.03 233.42 =============== 614-01582 Steel Sign Supp (2-1/2 In Rd)(Po&Slip) Lin Foot =============================================== HB 0063-021 US 6: RIFLE TO NEW CASTLE 01/04/07 62.00 48.00 70.95 45.70 STA 012A-042 SH 12, S. OF LA VETA 01/18/07 158.00 36.00 37.63 34.00 STA 069A-021 SH 69, W. OF WALSENBURG 01/25/07 88.00 40.00 40.75 45.00 NH 0402-070 US 40 ROUTT COUNTY 02/08/07 96.00 50.00 61.75 45.50 SHE 1151-018 SH 115 - GUMAER AVENUE EAST 03/08/07 82.00 38.00 46.54 57.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 486.00 41.36 47.18 43.77 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 37.50 60.00 62.50 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 37.50 60.00 62.50 80.00 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 82.00 40.00 36.88 33.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 354 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01582 Steel Sign Supp (2-1/2 In Rd)(Po&Slip) Lin Foot =============================================== STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 83.00 100.00 45.13 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 165.00 70.18 40.57 36.52 C120A-007 ON SH 120 AT PORTLAND OVER TH 11/29/07 112.00 36.00 38.60 45.00 CC 0821-084 SH82 ASPEN 12/20/07 267.00 35.00 33.17 33.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 379.00 35.30 34.35 36.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,067.50 44.32 41.43 41.36 =============== 614-01583 Stl Sign Supp(2-1/2 In Rd 80)(Po&Slip) Each =================================================== NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 48.00 350.00 437.69 395.00 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 4.00 400.00 427.85 410.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 63.00 380.00 399.91 384.48 IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 8.00 350.00 531.66 470.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 123.00 366.99 432.44 394.98 NH 030A-025 SH30 (HAVANA)- PARKER TO FLOR 04/19/07 6.00 350.00 373.08 340.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 81.00 420.00 414.58 385.30 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 13.00 400.00 399.50 530.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 100.00 413.20 409.36 401.39 STA 340A-013 SH 340 IN FRUITA 10/25/07 3.00 360.00 441.75 515.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 19.00 170.00 433.00 325.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 22.00 195.91 433.83 350.91 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 245.00 370.49 424.06 393.64 =============== 614-01585 Steel Sign Supp (2-1/2 In Rd 80 )(Po) Lin Foot =============================================== IM 0702-269 I 70 IN EAGLE COUNTY 01/11/07 84.00 30.00 28.00 24.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 355 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01585 Steel Sign Supp (2-1/2 In Rd 80 )(Po) Lin Foot =============================================== NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 60.00 40.00 42.37 100.00 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 13.00 23.00 34.82 35.00 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 14.00 30.00 32.55 30.00 STA0091-030 SH 9 BETWEEN FAIRPLAY AND ALM 03/22/07 12.00 30.00 31.58 36.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 183.00 32.78 35.63 51.00 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 22.00 28.09 27.18 27.00 NH 0405-025 KIT CARSON BRIDGE 04/26/07 33.00 30.89 18.12 20.00 STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 26.00 30.40 27.85 30.50 IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 484.00 26.50 26.00 28.00 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 19.00 25.00 24.00 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 584.00 26.93 25.49 27.36 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 84.00 30.00 22.55 21.63 BR 0253-192 I-25&128TH 08/16/07 16.00 30.00 25.39 26.25 CR100-126 WEST OF KIT CARSON 08/16/07 24.00 28.73 43.11 32.00 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 11.00 50.00 28.06 45.00 IM 0703-331 WB I-70 AT M.P. 259.70 AND M. 09/06/07 161.00 28.00 26.98 15.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 296.00 29.55 25.96 20.23 SHE0092-019 SH 9 NORTH OF SILVERTHORNE, I 10/18/07 84.00 34.50 31.44 20.20 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 230.00 29.75 34.84 43.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 314.00 31.02 34.21 36.90 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,377.00 29.21 30.19 31.15 =============== 614-01588 Steel Sign Supp (2-1/2 In Rd 80)(Slip) Each =================================================== IM 0702-269 I 70 IN EAGLE COUNTY 01/11/07 5.00 200.00 237.50 175.00 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 5.00 185.00 227.00 180.00 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 1.00 175.00 206.96 185.00 STA0091-030 SH 9 BETWEEN FAIRPLAY AND ALM 03/22/07 1.00 200.00 195.08 211.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12.00 191.67 223.20 180.95 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 356 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01588 Steel Sign Supp (2-1/2 In Rd 80)(Slip) Each =================================================== HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 2.00 148.05 202.85 170.00 NH 0405-025 KIT CARSON BRIDGE 04/26/07 36.00 168.47 192.36 200.00 STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 3.00 189.19 322.20 425.00 IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 44.00 159.50 190.00 220.00 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 2.00 180.00 276.67 280.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 87.00 164.44 201.32 219.02 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 37.00 175.00 213.10 173.87 BR 0253-192 I-25&128TH 08/16/07 2.00 200.00 304.34 305.00 CR100-126 WEST OF KIT CARSON 08/16/07 2.00 256.75 296.54 300.00 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 2.00 200.00 198.61 175.00 IM 0703-331 WB I-70 AT M.P. 259.70 AND M. 09/06/07 18.00 180.00 231.08 259.33 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 61.00 180.80 220.32 207.56 SHE0092-019 SH 9 NORTH OF SILVERTHORNE, I 10/18/07 7.00 162.00 285.45 379.25 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 20.00 167.75 242.27 320.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 27.00 166.26 250.02 335.36 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 187.00 171.79 221.27 229.64 =============== 614-03001 Conc Footing (Ty 1) Each =================================================== SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 6.00 800.00 456.63 166.50 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 4.00 800.00 610.42 889.17 IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 8.00 1075.00 1150.00 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 18.00 922.22 698.67 741.98 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18.00 922.22 698.67 741.98 =============== 614-03002 Conc Footing (Ty 2) Each =================================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 4.00 1000.00 682.44 1086.77 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 357 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-03002 Conc Footing (Ty 2) Each =================================================== IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 4.00 1150.00 1450.00 1400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 1075.00 938.30 1243.39 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 2.00 1200.00 2775.02 2600.00 IM 0703-331 WB I-70 AT M.P. 259.70 AND M. 09/06/07 8.00 1300.00 1522.95 871.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 1280.00 1821.06 1217.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18.00 1188.89 1500.05 1228.96 =============== 614-03003 Conc Footing (Ty 3) Each =================================================== SHE 5502-054 02/22/07 2.00 1000.00 14137.83 16725.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1000.00 14137.83 16725.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 2.00 1200.00 809.72 1284.36 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 2.00 1400.00 980.19 674.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 1300.00 918.20 979.18 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 1200.00 5583.95 6227.79 =============== 614-03005 Conc Footing (Ty 5) Each =================================================== IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 4.00 1500.00 2100.00 1700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 1500.00 2100.00 1700.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 2.00 1900.00 2614.50 2150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 1900.00 2614.50 2150.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 1633.33 2408.70 1850.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 358 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-10050 Mod Overhead Sign Str Each =================================================== IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 6.00 5000.00 1188.45 290.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 5000.00 1188.45 290.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 5000.00 1188.45 290.00 =============== 614-10123 Inst Var Mesg Sign Each =================================================== ITSSW00-378 VMS REPLACEMENT IN REGIONS 1, 06/21/07 8.00 6000.00 10328.80 14836.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 6000.00 10328.80 14836.40 ITSSW00-455 VMS REPLACEMENT IN REGIONS 1, 08/30/07 12.00 10000.00 7933.00 10600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.00 10000.00 7933.00 10600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 8400.00 9130.90 12294.56 =============== 614-10125 Var Mesg Sign (Grnd Mtd) Each =================================================== SHE 0931-027 SH 93 @ SH 72 01/25/07 1.00 105000.00 109003.31 99400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 105000.00 109003.31 99400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 105000.00 109003.31 99400.00 =============== 614-10128 Blankout Sign (Fib Opt) Each =================================================== IM 0703-336 WB I-70 AT M.P. 259.70 AND M. 10/18/07 12.00 12398.00 17647.50 15590.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 12.00 12398.00 17647.50 15590.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 12398.00 17647.50 15590.00 =============== 614-10129 Blankout Sign (Fib Opt) (VSL) Each =================================================== IM 0703-336 WB I-70 AT M.P. 259.70 AND M. 10/18/07 2.00 6125.00 15758.75 13835.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 6125.00 15758.75 13835.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 6125.00 15758.75 13835.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 359 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-10130 Illuminated Sign Each =================================================== STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 4.00 800.00 4300.50 4000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 800.00 4300.50 4000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 800.00 4300.50 4000.00 =============== 614-10145 VMS LED (Single Faced) Each =================================================== IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 4.00 20600.00 15500.00 16000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 20600.00 15500.00 16000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 20600.00 15500.00 16000.00 =============== 614-10146 VMS (LED) (Ground Mounted) Each =================================================== SHE 1151-020 SH 115 VMS, MP 17 AND MP 41 02/15/07 2.00 100000.00 79491.23 86766.37 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 100000.00 79491.23 86766.37 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 100000.00 79491.23 86766.37 =============== 614-10147 VMS LED (Overhead) Each =================================================== STA 0703-312 I-70 HIDDEN VALLEY AND FALL R 05/17/07 2.00 126505.72 111100.00 111100.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 2.00 130000.00 128780.28 118185.62 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 128252.86 125244.22 114642.81 IM R400-215 I-25 & I-76 VMS INSTALLATION 09/06/07 2.00 127000.00 119360.00 118500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 127000.00 119360.00 118500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 127835.24 122302.11 115928.54 =============== 614-10160 Sig Head B-Plates Each =================================================== NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 5.00 110.00 164.83 175.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 110.00 164.83 175.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 110.00 164.83 175.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 360 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-30110 Btrfly Str Each =================================================== SHE 1151-020 SH 115 VMS, MP 17 AND MP 41 02/15/07 2.00 30000.00 42488.38 23849.29 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 30000.00 42488.38 23849.29 ITSSW00-455 VMS REPLACEMENT IN REGIONS 1, 08/30/07 1.00 20000.00 24425.00 18100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 20000.00 24425.00 18100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 26666.67 39907.90 21932.86 =============== 614-30205 VMS Butterfly Support (Roadside) Each =================================================== SHE 0931-027 SH 93 @ SH 72 01/25/07 1.00 12000.00 24573.07 22880.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 12000.00 24573.07 22880.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 12000.00 24573.07 22880.00 =============== 614-31800 Monotube Overhead Sign Cant (18 In Dia) Each =================================================== BR 0253-192 I-25&128TH 08/16/07 1.00 30000.00 30415.18 31400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 30000.00 30415.18 31400.00 STA 340A-013 SH 340 IN FRUITA 10/25/07 3.00 25000.00 27778.75 26800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 25000.00 27778.75 26800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 26250.00 28554.17 27950.00 =============== 614-32000 Monotube Overhead Sign Cant (20 In Dia) Each =================================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 3.00 20000.00 30275.31 29471.23 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 20000.00 30275.31 29471.23 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 20000.00 30275.31 29471.23 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 361 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-32400 Monotube Overhead Sign Cant (24 In Dia) Each =================================================== STA 0703-312 I-70 HIDDEN VALLEY AND FALL R 05/17/07 2.00 27129.58 47250.00 47250.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 6.00 40000.00 36326.93 32979.71 ITSSW00-378 VMS REPLACEMENT IN REGIONS 1, 06/21/07 7.00 38000.00 42432.62 46397.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 15.00 37350.61 39519.81 41144.21 ITSSW00-455 VMS REPLACEMENT IN REGIONS 1, 08/30/07 9.00 45000.00 41375.00 39500.00 IM R400-215 I-25 & I-76 VMS INSTALLATION 09/06/07 2.00 41500.00 36923.00 32640.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 11.00 44363.64 39785.00 38252.73 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26.00 40317.66 39618.82 39920.89 =============== 614-32900 Inst Monotube Overhead Sign Cant Each =================================================== CR600-285 VARIOUS LOCATIONS IN REGION 6 06/28/07 9.00 5000.00 7613.33 4350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 9.00 5000.00 7613.33 4350.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 5000.00 7613.33 4350.00 =============== 614-42500 Monotube Overhead Sign Brdg (Inst Only) Each =================================================== CR600-285 VARIOUS LOCATIONS IN REGION 6 06/28/07 1.00 12500.00 13233.33 6500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 12500.00 13233.33 6500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 12500.00 13233.33 6500.00 =============== 614-70117 Ped Sig Face (16) Each =================================================== SHE 0931-027 SH 93 @ SH 72 01/25/07 4.00 500.00 512.00 485.00 NH 1602-102 WITHIN THE ALAMOSA CITY LIMIT 02/15/07 2.00 600.00 580.00 640.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 52.00 600.00 757.05 734.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 58.00 593.10 725.89 713.94 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 12.00 500.00 558.67 491.19 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 362 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-70117 Ped Sig Face (16) Each =================================================== SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 16.00 400.00 430.37 360.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 8.00 450.00 477.67 375.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 36.00 444.44 484.00 407.06 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 2.00 550.00 622.25 600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 550.00 622.25 600.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 4.00 533.75 659.91 625.00 SHE 082A-010 SH 82 AND BUFFALO VALLEY ROAD 11/29/07 2.00 525.00 526.63 518.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 530.83 633.25 589.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 102.00 536.13 623.05 596.07 =============== 614-70150 Ped Sig Face (16) (Countdown) Each =================================================== STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 8.00 500.00 564.00 610.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 500.00 564.00 610.00 STSR400-229 SH 14, SH 93, & SH 157 IN BOU 12/06/07 21.00 530.00 501.00 556.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 21.00 530.00 501.00 556.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 29.00 521.72 524.86 570.90 =============== 614-70336 Traf Sig Face (12-12-12) Each =================================================== NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 15.00 700.00 749.21 765.00 SHE 0931-027 SH 93 @ SH 72 01/25/07 19.00 600.00 693.48 700.00 NH 1602-102 WITHIN THE ALAMOSA CITY LIMIT 02/15/07 10.00 700.00 785.00 970.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 77.00 850.00 935.23 907.20 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 19.00 600.00 753.75 739.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 363 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-70336 Traf Sig Face (12-12-12) Each =================================================== SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 8.00 750.00 641.08 600.00 STA402A-007 SH 402 & I-25 OFFRAMS AND E. 03/22/07 28.00 650.00 641.25 555.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 176.00 738.35 772.72 788.13 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 19.00 600.00 871.25 810.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 28.00 700.00 908.24 806.95 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 10.00 800.00 975.00 850.00 CR400-216 SIGNALS @ US34 & SH37, KERSEY 05/24/07 12.00 730.00 720.00 700.00 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 39.00 700.00 733.98 600.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 17.00 600.00 846.67 775.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 125.00 682.08 825.51 731.68 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 15.00 750.00 768.10 700.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 5.00 850.00 1066.38 980.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20.00 775.00 830.89 770.00 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 12.00 730.00 914.27 900.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 10.00 753.50 767.77 750.00 SHE 082A-010 SH 82 AND BUFFALO VALLEY ROAD 11/29/07 14.00 800.00 844.13 822.00 C120A-007 ON SH 120 AT PORTLAND OVER TH 11/29/07 7.00 700.00 825.65 800.00 STSR400-229 SH 14, SH 93, & SH 157 IN BOU 12/06/07 60.00 650.00 685.20 821.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 4.00 800.00 826.89 770.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 107.00 697.15 770.81 820.07 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 428.00 713.33 786.95 778.78 =============== 614-70560 Traf Sig Face (12-12-12-12-12) Each =================================================== NH 1602-102 WITHIN THE ALAMOSA CITY LIMIT 02/15/07 2.00 900.00 1155.00 1435.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 6.00 1400.00 1277.57 1231.20 STA402A-007 SH 402 & I-25 OFFRAMS AND E. 03/22/07 2.00 850.00 1087.75 997.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 1190.00 1210.61 1225.12 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 364 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-70560 Traf Sig Face (12-12-12-12-12) Each =================================================== SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 5.00 1000.00 1346.00 1339.00 CR400-216 SIGNALS @ US34 & SH37, KERSEY 05/24/07 4.00 1150.00 1050.00 1000.00 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 7.00 1000.00 1070.84 920.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 3.00 100.00 1282.33 1150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 19.00 889.47 1182.22 1083.42 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 1.00 850.00 1206.03 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 850.00 1206.03 1100.00 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 4.00 1150.00 1257.70 1300.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 8.00 1189.50 1049.06 1000.00 STSR400-229 SH 14, SH 93, & SH 157 IN BOU 12/06/07 3.00 1000.00 1171.00 1285.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 15.00 1141.07 1138.57 1137.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 45.00 1039.24 1162.50 1133.14 =============== 614-72745 Blank Out Sign Mntig Support & Wiring Each =================================================== SHE 160A-009 U.S. 160 MP 94.15 - MP 96.63 12/20/07 12.00 750.00 1546.32 365.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 12.00 750.00 1546.32 365.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 750.00 1546.32 365.00 =============== 614-72830 Communications Cabinet Each =================================================== ITSSW00-378 VMS REPLACEMENT IN REGIONS 1, 06/21/07 1.00 7000.00 7735.78 6711.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 7000.00 7735.78 6711.35 ITSSW00-455 VMS REPLACEMENT IN REGIONS 1, 08/30/07 5.00 4000.00 6530.00 4800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 4000.00 6530.00 4800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 4500.00 6808.26 5118.56 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 365 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-72855 Traf Sig Ctrl Cabinet Each =================================================== NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 7.00 15000.00 24852.33 24057.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7.00 15000.00 24852.33 24057.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 2.00 10000.00 11512.28 14535.13 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 10000.00 11512.28 14535.13 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 13888.89 21172.32 21941.03 =============== 614-72858 Ped Pole (3.5 In) Each =================================================== NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 1.00 800.00 555.92 466.00 NH 1602-102 WITHIN THE ALAMOSA CITY LIMIT 02/15/07 1.00 1000.00 1020.00 1440.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 900.00 671.94 953.00 STSR400-229 SH 14, SH 93, & SH 157 IN BOU 12/06/07 2.00 750.00 998.80 1372.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 750.00 998.80 1372.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 825.00 853.53 1162.50 =============== 614-72860 Ped Push Button Each =================================================== NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 1.00 105.00 89.33 87.00 NH 1602-102 WITHIN THE ALAMOSA CITY LIMIT 02/15/07 2.00 200.00 180.00 250.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 51.00 135.00 253.42 243.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 54.00 136.85 245.58 240.37 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 12.00 120.00 170.56 90.22 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12.00 120.00 170.56 90.22 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 366 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-72860 Ped Push Button Each =================================================== SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 8.00 150.00 89.00 89.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 2.00 200.00 210.88 130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 160.00 149.94 97.20 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 4.00 172.50 225.89 200.00 SHE 082A-010 SH 82 AND BUFFALO VALLEY ROAD 11/29/07 4.00 150.00 125.88 98.00 STSR400-229 SH 14, SH 93, & SH 157 IN BOU 12/06/07 21.00 125.00 203.00 225.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 2.00 175.00 212.54 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 31.00 137.58 200.65 203.77 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 107.00 137.34 213.58 199.55 =============== 614-72864 Fire Preempt Unit Each =================================================== NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 21.00 2700.00 2379.75 2268.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 21.00 2700.00 2379.75 2268.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21.00 2700.00 2379.75 2268.00 =============== 614-72866 Fire Preempt Unit + Timer Each =================================================== STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 4.00 5500.00 1983.25 2550.00 STA402A-007 SH 402 & I-25 OFFRAMS AND E. 03/22/07 3.00 6000.00 3987.50 1934.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7.00 5714.29 2529.86 2286.00 CR400-216 SIGNALS @ US34 & SH37, KERSEY 05/24/07 1.00 2900.00 5060.00 3800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 2900.00 5060.00 3800.00 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 2.00 3500.00 2683.61 2200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 3500.00 2683.61 2200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 4990.00 2654.02 2420.20 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 367 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-72871 Loop Detect Wire (Prefab) Spec Lin Foot =============================================== NH 1602-102 WITHIN THE ALAMOSA CITY LIMIT 02/15/07 2,498.00 8.00 8.35 7.70 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 2,952.00 8.00 11.27 10.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,450.00 8.00 10.21 9.38 NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 132.00 20.00 33.50 17.00 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 1,402.00 8.00 12.00 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,534.00 9.03 15.41 10.60 SHE 160A-009 U.S. 160 MP 94.15 - MP 96.63 12/20/07 1,758.00 15.00 33.68 41.68 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,758.00 15.00 33.68 41.68 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,742.00 9.59 17.74 16.09 =============== 614-72872 Loop Detect (Micro Type) Each =================================================== NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 26.00 100.00 483.51 395.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 26.00 100.00 483.51 395.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26.00 100.00 483.51 395.00 =============== 614-72875 Loop Detect Wire Lin Foot =============================================== NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 3,540.00 3.00 2.39 2.20 SHE 0931-027 SH 93 @ SH 72 01/25/07 2,160.00 3.00 3.68 2.15 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 12,222.00 3.00 1.96 1.85 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 272.00 5.00 10.83 4.30 IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 2,800.00 3.00 3.14 3.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20,994.00 3.03 2.45 2.13 NH 030A-025 SH30 (HAVANA)- PARKER TO FLOR 04/19/07 6,354.00 2.50 2.47 2.10 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 368 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-72875 Loop Detect Wire Lin Foot =============================================== NH 3851-016 US 385 NORTH OF BURLINGTON 05/24/07 660.00 5.21 4.03 3.60 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 6,000.00 2.00 3.57 2.50 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 2,832.00 2.00 2.72 2.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 15,846.00 2.33 2.91 2.41 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 350.00 4.00 10.50 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 350.00 4.00 10.50 8.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 712.00 3.00 4.01 3.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 712.00 3.00 4.01 3.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 37,902.00 2.75 2.69 2.33 =============== 614-72876 Detect Amp (Loop) (2) Each =================================================== NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 3.00 750.00 1450.00 900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 750.00 1450.00 900.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 750.00 1450.00 900.00 =============== 614-72878 Detect Amp (Loop) (4) Each =================================================== NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 16.00 800.00 730.41 700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16.00 800.00 730.41 700.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 2.00 800.00 950.33 825.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 800.00 950.33 825.00 SHE 082A-010 SH 82 AND BUFFALO VALLEY ROAD 11/29/07 4.00 1200.00 435.13 265.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 1200.00 435.13 265.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 22.00 872.73 705.00 632.27 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 369 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-72882 Detect (Micro) Each =================================================== SHE 0931-027 SH 93 @ SH 72 01/25/07 6.00 600.00 1018.50 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 600.00 1018.50 350.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 600.00 1018.50 350.00 =============== 614-72886 Intersection Detect Sys (Camera) Each =================================================== STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 4.00 8000.00 5696.88 4765.00 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 2.00 5500.00 5713.13 5600.00 STA402A-007 SH 402 & I-25 OFFRAMS AND E. 03/22/07 10.00 6500.00 5409.25 4992.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16.00 6750.00 5575.35 5011.25 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 2.00 5000.00 6864.00 6556.00 CR400-216 SIGNALS @ US34 & SH37, KERSEY 05/24/07 4.00 5500.00 5490.00 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 5333.33 6177.00 5518.67 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 3.00 7000.00 6039.68 5500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 7000.00 6039.68 5500.00 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 1.00 6500.00 25371.16 27000.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 4.00 6396.75 6254.56 6200.00 SHE 082A-010 SH 82 AND BUFFALO VALLEY ROAD 11/29/07 4.00 7800.00 5674.75 5725.00 STSR400-229 SH 14, SH 93, & SH 157 IN BOU 12/06/07 4.00 5000.00 6380.40 6262.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 13.00 6406.69 8830.79 7672.92 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 38.00 6428.61 6930.66 6040.53 =============== 614-72887 Detect (Microwave Veh) Each =================================================== ITS SW00-457 DRCOG REGION 08/09/07 5.00 15000.00 10946.30 12232.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 15000.00 10946.30 12232.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 15000.00 10946.30 12232.60 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 370 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-72889 Detect (Micro) (Non-Invasive) Each =================================================== NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 12.00 800.00 589.46 550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12.00 800.00 589.46 550.00 CR400-216 SIGNALS @ US34 & SH37, KERSEY 05/24/07 4.00 600.00 902.50 1100.00 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 10.00 800.00 671.72 590.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 6.00 700.00 763.33 745.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20.00 730.00 724.68 738.50 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 2.00 800.00 841.67 800.00 SHE 082A-010 SH 82 AND BUFFALO VALLEY ROAD 11/29/07 4.00 740.00 610.38 608.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 760.00 744.28 672.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 38.00 756.84 668.22 668.47 =============== 614-72890 Span Wire Cable Lin Foot =============================================== STA402A-007 SH 402 & I-25 OFFRAMS AND E. 03/22/07 355.00 9.00 12.11 11.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 355.00 9.00 12.11 11.45 SHE 082A-010 SH 82 AND BUFFALO VALLEY ROAD 11/29/07 440.00 10.00 9.53 5.08 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 440.00 10.00 9.53 5.08 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 795.00 9.55 10.68 7.92 =============== 614-72893 Signal Cable Lin Foot =============================================== NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 125.00 10.00 16.81 3.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 125.00 10.00 16.81 3.25 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 371 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-72893 Signal Cable Lin Foot =============================================== ITS SW00-457 DRCOG REGION 08/09/07 2,770.00 5.00 6.63 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,770.00 5.00 6.63 8.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,895.00 5.22 7.47 7.79 =============== 614-72896 Inst Intersect Detect Sys (Camera) Each =================================================== NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 15.00 900.00 574.00 600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15.00 900.00 574.00 600.00 SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 2.00 800.00 1350.00 1350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 800.00 1350.00 1350.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17.00 888.24 594.16 688.24 =============== 614-73005 Piezo Elec Tube, CL 2 Each =================================================== NH 3851-016 US 385 NORTH OF BURLINGTON 05/24/07 2.00 1450.00 7255.00 6765.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 1450.00 7255.00 6765.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1450.00 7255.00 6765.00 =============== 614-75216 Inst Ped Sig Face (16) Each =================================================== SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 8.00 200.00 195.00 195.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 200.00 195.00 195.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 200.00 195.00 195.00 =============== 614-75336 Inst Traf Sig Face (12-12-12) Each =================================================== SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 14.00 250.00 210.00 210.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 14.00 250.00 210.00 210.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 250.00 210.00 210.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 372 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-75848 Inst Traf Sig Ctrler + Cab Each =================================================== SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 1.00 1000.00 1800.00 1800.00 ITS SW00-457 DRCOG REGION 08/09/07 3.00 4000.00 2656.55 1753.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 3250.00 2534.19 1764.83 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 3250.00 2534.19 1764.83 =============== 614-75855 Inst Traf Sig Ctrler Cab Each =================================================== ITS SW00-457 DRCOG REGION 08/09/07 8.00 3000.00 1450.80 751.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 3000.00 1450.80 751.60 C120A-007 ON SH 120 AT PORTLAND OVER TH 11/29/07 1.00 500.00 2442.50 3000.00 SHE 160A-009 U.S. 160 MP 94.15 - MP 96.63 12/20/07 1.00 3000.00 5233.58 2100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 1750.00 3838.04 2550.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 2750.00 2246.55 1111.28 =============== 614-80000 Flash Beacon Each =================================================== CR400-216 SIGNALS @ US34 & SH37, KERSEY 05/24/07 2.00 2000.00 2335.00 2520.00 IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 8.00 1850.00 500.00 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 1880.00 867.00 904.00 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 1.00 1900.00 2915.25 2800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1900.00 2915.25 2800.00 IM 0703-336 WB I-70 AT M.P. 259.70 AND M. 10/18/07 6.00 1529.75 836.25 650.00 STA 340A-013 SH 340 IN FRUITA 10/25/07 3.00 1500.00 3476.25 3550.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 373 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-80000 Flash Beacon Each =================================================== STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 4.00 2777.25 2725.00 2700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 13.00 1906.73 2190.96 1950.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 24.00 1895.31 1945.17 1549.58 =============== 614-80001 Flash Beacon (Solar Pwred) Each =================================================== SHE 0931-027 SH 93 @ SH 72 01/25/07 3.00 5000.00 4567.67 4345.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 5000.00 4567.67 4345.00 SHE0092-019 SH 9 NORTH OF SILVERTHORNE, I 10/18/07 8.00 7647.25 8756.00 5550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8.00 7647.25 8756.00 5550.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 6925.27 7613.73 5221.36 =============== 614-80312 Barricade (Ty 3 F-B) Each =================================================== NH 0405-025 KIT CARSON BRIDGE 04/26/07 1.00 1862.50 1538.59 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 1862.50 1538.59 1500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1862.50 1538.59 1500.00 =============== 614-80313 Barricade (Ty 3 F-C) Each =================================================== NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 1.00 900.00 1950.00 800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 900.00 1950.00 800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 900.00 1950.00 800.00 =============== 614-80321 Barricade (Ty 3 M-A) Each =================================================== SHE 0931-027 SH 93 @ SH 72 01/25/07 6.00 250.00 778.70 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 250.00 778.70 40.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 250.00 778.70 40.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 374 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-80385 Rumble Strip Lin Foot =============================================== STA 0961-012 SH 96, OVERLAY IN PUEBLO 01/04/07 5,100.00 2.00 1.60 1.15 STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 2,904.00 2.50 2.32 2.30 IM 0253-194 ON I-25 IN WELD COUNTY 01/25/07 59,480.00 0.20 0.14 0.15 STA 086A-045 SH 86 - FRANKTOWN TO ELBERT C 02/01/07 57,235.00 0.15 0.20 0.20 IM0252-388 I-25 LARKSPUR INTERCHANGE NOR 03/08/07 39,830.00 0.30 0.21 0.26 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 6,404.00 1.20 1.88 1.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 170,953.00 0.34 0.34 0.32 STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 42,583.00 0.49 0.26 0.35 NH 3851-016 US 385 NORTH OF BURLINGTON 05/24/07 46,344.00 0.22 0.17 0.14 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 88,927.00 0.35 0.23 0.24 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 2,728.00 1.00 2.48 0.85 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 1,400.00 0.25 4.17 4.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,128.00 0.75 2.88 1.99 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 264,008.00 0.35 0.34 0.32 =============== 614-80387 Rumble Strip (Grind) Lin Foot =============================================== IM 0702-269 I 70 IN EAGLE COUNTY 01/11/07 134,626.00 0.15 0.20 0.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 134,626.00 0.15 0.20 0.15 SHE 165A-011 ALONG SH 165 N/O RYE 04/05/07 9,000.00 0.80 0.78 0.75 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 58,145.00 0.80 0.42 0.36 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 79,440.00 0.11 0.10 0.10 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 34,282.00 0.25 0.17 0.29 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 180,867.00 0.39 0.24 0.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 315,493.00 0.29 0.23 0.21 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 375 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-80391 Rumble Strip (Grind)(Asphalt) Lin Foot =============================================== NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 13,980.00 0.17 0.15 0.15 NH 0062-023 SH 6, CLEAR CREEK CANYON 02/08/07 68,097.00 0.16 0.20 0.18 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 82,077.00 0.16 0.20 0.17 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 33,848.00 0.24 0.23 0.40 STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 87,800.00 0.35 0.10 0.07 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 121,648.00 0.32 0.14 0.16 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 203,725.00 0.26 0.16 0.17 =============== 614-81000 Sig-Light Pole Steel Each =================================================== NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 9.00 11000.00 7846.58 7668.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9.00 11000.00 7846.58 7668.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 11000.00 7846.58 7668.00 =============== 614-81010 Sig-Light Pole Steel (1) Each =================================================== NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 19.00 20000.00 14626.75 14148.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 19.00 20000.00 14626.75 14148.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19.00 20000.00 14626.75 14148.00 =============== 614-81020 Sig-Light Pole Steel (2) Each =================================================== NH 1602-102 WITHIN THE ALAMOSA CITY LIMIT 02/15/07 1.00 50000.00 41200.00 34400.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 1.00 65000.00 17813.83 17280.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 57500.00 27168.30 25840.00 SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 1.00 30000.00 12833.00 12833.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 30000.00 12833.00 12833.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 376 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-81020 Sig-Light Pole Steel (2) Each =================================================== C R400-217 SIGNALS @ SH66 & CR13 10/04/07 1.00 25000.00 22606.32 24000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 25000.00 22606.32 24000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 42500.00 23373.18 22128.25 =============== 614-81120 Sig-Light Pole Steel (1-20 Ft) Each =================================================== STSR400-229 SH 14, SH 93, & SH 157 IN BOU 12/06/07 1.00 12000.00 13606.40 12050.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 12000.00 13606.40 12050.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 12000.00 13606.40 12050.00 =============== 614-81125 Sig-Light Pole Steel (1-25 Ft) Each =================================================== C R400-217 SIGNALS @ SH66 & CR13 10/04/07 1.00 16000.00 12037.55 13000.00 STSR400-229 SH 14, SH 93, & SH 157 IN BOU 12/06/07 1.00 12400.00 13952.80 13167.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 14200.00 12636.06 13083.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 14200.00 12636.06 13083.50 =============== 614-81130 Sig-Light Pole Steel (1-30 Ft) Each =================================================== STA402A-007 SH 402 & I-25 OFFRAMS AND E. 03/22/07 1.00 19700.00 15437.50 14005.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 19700.00 15437.50 14005.00 CR400-216 SIGNALS @ US34 & SH37, KERSEY 05/24/07 2.00 15500.00 18327.50 17755.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 1.00 18000.00 17720.00 15900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 16333.33 18067.14 17136.67 SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 1.00 15000.00 13900.00 13900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 15000.00 13900.00 13900.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 377 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-81130 Sig-Light Pole Steel (1-30 Ft) Each =================================================== C R400-217 SIGNALS @ SH66 & CR13 10/04/07 1.00 16300.00 12176.01 13000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 16300.00 12176.01 13000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 16666.67 14611.13 15385.83 =============== 614-81135 Sig-Light Pole Steel (1-35 Ft) Each =================================================== STA402A-007 SH 402 & I-25 OFFRAMS AND E. 03/22/07 1.00 19700.00 15528.00 14017.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 19700.00 15528.00 14017.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 1.00 20000.00 19207.64 21752.57 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 2.00 17000.00 16849.25 14940.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 18000.00 17635.38 17210.86 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 18425.00 17108.54 16412.39 =============== 614-81140 Sig-Light Pole Steel (1-40 Ft) Each =================================================== STA402A-007 SH 402 & I-25 OFFRAMS AND E. 03/22/07 2.00 20300.00 16968.00 15982.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 20300.00 16968.00 15982.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 1.00 22000.00 21266.16 24258.63 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 1.00 20000.00 17250.00 30000.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 1.00 18000.00 19850.00 17900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 20000.00 19901.63 24052.88 STSR400-229 SH 14, SH 93, & SH 157 IN BOU 12/06/07 3.00 13500.00 15625.80 14282.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 13500.00 15625.80 14282.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 17637.50 17163.93 18371.08 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 378 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-81145 Sig-Light Pole Steel (1-45 Ft) Each =================================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 3.00 23000.00 21990.97 24358.86 CR400-216 SIGNALS @ US34 & SH37, KERSEY 05/24/07 2.00 17000.00 19850.00 19500.00 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 2.00 19000.00 18461.75 16560.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7.00 20142.86 20457.73 20742.37 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 2.00 20605.00 19639.27 17000.00 STSR400-229 SH 14, SH 93, & SH 157 IN BOU 12/06/07 3.00 14400.00 15952.20 14393.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 16882.00 17855.20 15435.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 18784.17 18990.85 18531.30 =============== 614-81150 Sig-Light Pole Steel (1-50 Ft) Each =================================================== SHE 0931-027 SH 93 @ SH 72 01/25/07 1.00 20000.00 20670.81 22610.00 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 2.00 17000.00 11951.25 11745.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 18000.00 14027.33 15366.67 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 1.00 24000.00 22216.39 25461.54 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 24000.00 22216.39 25461.54 SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 1.00 19000.00 18400.00 18400.00 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 3.00 22000.00 18566.09 17000.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 1.00 3000.00 32661.75 25000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 17600.00 21376.91 18880.00 STSR400-229 SH 14, SH 93, & SH 157 IN BOU 12/06/07 2.00 14200.00 16389.20 16512.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 14200.00 16389.20 16512.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 17672.73 17724.91 18089.59 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 379 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-81155 Sig-Light Pole Steel (1-55 Ft) Each =================================================== SHE 0931-027 SH 93 @ SH 72 01/25/07 2.00 20000.00 21146.48 22355.00 NH 1602-102 WITHIN THE ALAMOSA CITY LIMIT 02/15/07 1.00 35000.00 23000.00 21000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 25000.00 21455.40 21903.33 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 1.00 20000.00 20633.33 18400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 20000.00 20633.33 18400.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 1.00 23623.75 20876.56 20000.00 STSR400-229 SH 14, SH 93, & SH 157 IN BOU 12/06/07 3.00 14600.00 16035.20 15955.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 16855.94 17719.15 16966.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 20302.97 19129.09 18996.88 =============== 614-81160 Sig-Light Pole Steel (1-60 Ft) Each =================================================== SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 2.00 28000.00 27496.00 25500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 28000.00 27496.00 25500.00 STSR400-229 SH 14, SH 93, & SH 157 IN BOU 12/06/07 1.00 20000.00 22885.00 20190.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 20000.00 22885.00 20190.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 25333.33 25722.54 23730.00 =============== 614-81165 Sig-Light Pole Steel (1-65 Ft) Each =================================================== SHE 0931-027 SH 93 @ SH 72 01/25/07 1.00 28000.00 32497.96 34230.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 28000.00 32497.96 34230.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 380 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-81165 Sig-Light Pole Steel (1-65 Ft) Each =================================================== STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 1.00 30000.00 30133.33 28000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 30000.00 30133.33 28000.00 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 1.00 29000.00 27835.60 25250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 29000.00 27835.60 25250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 29000.00 30159.06 29160.00 =============== 614-81170 Sig-Light Pole Steel (1-70 Ft) Each =================================================== STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 2.00 25000.00 14438.63 14130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 25000.00 14438.63 14130.00 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 1.00 31000.00 31216.75 29280.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 31000.00 31216.75 29280.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 1.00 27750.00 32542.66 30000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 27750.00 32542.66 30000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 27187.50 22008.08 21885.00 =============== 614-81175 Sig-Light Pole Steel (1-75 Ft) Each =================================================== SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 2.00 29500.00 35737.63 34500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 29500.00 35737.63 34500.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 381 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-81175 Sig-Light Pole Steel (1-75 Ft) Each =================================================== SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 1.00 33000.00 31349.25 29400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 33000.00 31349.25 29400.00 STSR400-229 SH 14, SH 93, & SH 157 IN BOU 12/06/07 1.00 23000.00 26242.00 22358.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 23000.00 26242.00 22358.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 28750.00 33495.16 30189.50 =============== 614-81240 Sig-Light Pole Steel (2-40 Ft) Each =================================================== STA402A-007 SH 402 & I-25 OFFRAMS AND E. 03/22/07 1.00 35400.00 25294.50 22413.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 35400.00 25294.50 22413.00 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 1.00 25000.00 40000.00 40000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 25000.00 40000.00 40000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 30200.00 30196.33 31206.50 =============== 614-81300 Inst Sig-Light Pole Each =================================================== C120A-007 ON SH 120 AT PORTLAND OVER TH 11/29/07 2.00 2400.00 2926.00 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 2400.00 2926.00 2500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 2400.00 2926.00 2500.00 =============== 614-84000 Traf Sig Ped Pole Steel Each =================================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 2.00 1300.00 968.00 832.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 382 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-84000 Traf Sig Ped Pole Steel Each =================================================== NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 1.00 2000.00 1500.00 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 1533.33 1074.40 888.00 SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 1.00 1600.00 610.00 610.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1600.00 610.00 610.00 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 1.00 1000.00 1728.10 1600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1000.00 1728.10 1600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 1440.00 1380.14 974.80 =============== 614-84100 Traf Sig Ped Pole Alum Each =================================================== BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 2.00 1500.00 1086.52 1020.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 1500.00 1086.52 1020.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1500.00 1086.52 1020.00 =============== 614-85045 Truck w/Mtd Atten & Flash Arrow Panel Each =================================================== SHE 0702-267 NEAR VAIL IN EAGLE COUNTY 08/02/07 1.00 42300.00 23182.00 9555.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 42300.00 23182.00 9555.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 42300.00 23182.00 9555.00 =============== 614-85115 Impact Atten (Quadguard) Each =================================================== STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 1.00 25000.00 32149.38 29100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 25000.00 32149.38 29100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 25000.00 32149.38 29100.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 383 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-85362 Sig-Light Span Wire Pole (12 In) Each =================================================== STA402A-007 SH 402 & I-25 OFFRAMS AND E. 03/22/07 4.00 6000.00 8428.00 3977.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 6000.00 8428.00 3977.00 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 10.00 5600.00 6468.50 7474.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 5600.00 6468.50 7474.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 5714.29 7028.36 6474.86 =============== 614-85366 Sig-Light Span Wire Pole (16 In) Each =================================================== SHE 082A-010 SH 82 AND BUFFALO VALLEY ROAD 11/29/07 4.00 8000.00 10767.25 9742.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 8000.00 10767.25 9742.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 8000.00 10767.25 9742.00 =============== 614-86000 Traf Sig Ctrler (M) Each =================================================== NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 1.00 3700.00 2736.78 2640.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 3700.00 2736.78 2640.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 3700.00 2736.78 2640.60 =============== 614-86002 Spread Spectrum Radio Each =================================================== ITS SW00-457 DRCOG REGION 08/09/07 6.00 2500.00 3051.80 4102.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 2500.00 3051.80 4102.60 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 1.00 2600.00 3347.31 3800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 2600.00 3347.31 3800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 2514.29 3193.13 4059.37 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 384 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-86005 Telemetry (Master) LUMP SUM =============================================== NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 1.00 2700.00 2287.90 2203.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 2700.00 2287.90 2203.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2700.00 2287.90 2203.20 =============== 614-86006 Telemetry (Master) Each =================================================== ITS SW00-457 DRCOG REGION 08/09/07 10.00 14000.00 8850.90 6591.80 ITSSW00-455 VMS REPLACEMENT IN REGIONS 1, 08/30/07 2.00 15000.00 3120.00 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.00 14166.67 7895.75 5659.83 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 14166.67 7895.75 5659.83 =============== 614-86105 Telemetry (Field) Each =================================================== NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 8.00 2100.00 7400.17 8640.00 STA402A-007 SH 402 & I-25 OFFRAMS AND E. 03/22/07 3.00 2000.00 2738.75 2380.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11.00 2072.73 5846.36 6932.73 CR400-216 SIGNALS @ US34 & SH37, KERSEY 05/24/07 1.00 2600.00 2830.00 2550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 2600.00 2830.00 2550.00 ITS SW00-457 DRCOG REGION 08/09/07 7.00 3000.00 2845.88 2871.75 ITSSW00-455 VMS REPLACEMENT IN REGIONS 1, 08/30/07 3.00 3000.00 3725.00 3800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 3000.00 3109.61 3150.23 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 22.00 2518.18 4798.64 5014.19 =============== 614-86106 Telemetry (Field)(Install Only) Each =================================================== SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 1.00 200.00 570.00 570.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 385 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-86106 Telemetry (Field)(Install Only) Each =================================================== ITS SW00-457 DRCOG REGION 08/09/07 18.00 400.00 564.78 779.55 ITSSW00-455 VMS REPLACEMENT IN REGIONS 1, 08/30/07 2.00 350.00 1325.00 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 21.00 385.71 639.07 733.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21.00 385.71 639.07 733.42 =============== 614-86238 Ctrler (S-S) (F-A) (8) Each =================================================== STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 1.00 10000.00 19102.88 19465.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 10000.00 19102.88 19465.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 10000.00 19102.88 19465.00 =============== 614-86240 Ctrler (Ty 170) Each =================================================== NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 6.00 7500.00 1935.45 2019.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 7500.00 1935.45 2019.60 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 1.00 20000.00 16250.00 15500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 20000.00 16250.00 15500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 9285.71 3366.91 3945.37 =============== 614-86245 Ctrler (Ty 170E) Each =================================================== NH 1602-102 WITHIN THE ALAMOSA CITY LIMIT 02/15/07 1.00 15000.00 15500.00 15500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 15000.00 15500.00 15500.00 IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 2.00 9000.00 8750.00 9000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 9000.00 8750.00 9000.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 386 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-86245 Ctrler (Ty 170E) Each =================================================== IM 0703-336 WB I-70 AT M.P. 259.70 AND M. 10/18/07 2.00 11301.00 14273.75 16725.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 11301.00 14273.75 16725.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 11120.40 12870.71 13390.00 =============== 614-86246 Ctrler (Ty 170E-HC11) Each =================================================== SHE 0931-027 SH 93 @ SH 72 01/25/07 1.00 15000.00 26531.01 22555.00 STA402A-007 SH 402 & I-25 OFFRAMS AND E. 03/22/07 2.00 11500.00 11339.00 10556.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 12666.67 17182.08 14555.67 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 2.00 16000.00 1618.59 2004.84 CR400-216 SIGNALS @ US34 & SH37, KERSEY 05/24/07 1.00 12000.00 13650.00 13400.00 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 2.00 15500.00 24771.25 23910.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 1.00 15000.00 22501.67 20500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 15000.00 14567.79 14288.28 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 1.00 18000.00 25167.76 24000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 18000.00 25167.76 24000.00 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 1.00 15500.00 11729.43 12000.00 SHE 082A-010 SH 82 AND BUFFALO VALLEY ROAD 11/29/07 1.00 14000.00 17452.75 17457.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 14750.00 13255.65 14728.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 14625.00 15814.15 15237.81 =============== 614-86735 Weather Sensor LUMP SUM =============================================== NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 1.00 15000.00 5833.67 6000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 15000.00 5833.67 6000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 15000.00 5833.67 6000.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 387 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-86740 Weather Monitor System LUMP SUM =============================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 1.00 75000.00 82492.58 79993.33 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 75000.00 82492.58 79993.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 75000.00 82492.58 79993.33 =============== 614-86752 Fold-Over Tower (ITS) Each =================================================== ITSSW00-455 VMS REPLACEMENT IN REGIONS 1, 08/30/07 6.00 7000.00 21577.50 18500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 7000.00 21577.50 18500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 7000.00 21577.50 18500.00 =============== 614-86756 Anti-Icing Syst LUMP SUM =============================================== IM0252-388 I-25 LARKSPUR INTERCHANGE NOR 03/08/07 1.00 375000.00 792994.97 741500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 375000.00 792994.97 741500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 375000.00 792994.97 741500.00 =============== 614-86757 Deicing Syst Each =================================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 3.00 450000.00 355566.10 351449.38 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 450000.00 355566.10 351449.38 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 450000.00 355566.10 351449.38 =============== 614-86758 Anti-Icing Sys Sq Yard ================================================ BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 1,823.00 206.00 191.94 161.58 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,823.00 206.00 191.94 161.58 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,823.00 206.00 191.94 161.58 =============== 614-86759 Anti-Icing Building Each =================================================== BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 1.00 40000.00 118190.30 96649.38 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 40000.00 118190.30 96649.38 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 40000.00 118190.30 96649.38 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 388 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-86800 Uninterrupted Power Supply Each =================================================== STA402A-007 SH 402 & I-25 OFFRAMS AND E. 03/22/07 2.00 4900.00 4747.00 4393.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 4900.00 4747.00 4393.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 2.00 5000.00 5854.97 7197.38 CR400-216 SIGNALS @ US34 & SH37, KERSEY 05/24/07 1.00 5000.00 5690.00 4980.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 5000.00 5821.98 6458.25 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 1.00 5500.00 5672.15 6200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 5500.00 5672.15 6200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 5050.00 5468.60 5726.79 =============== 614-87010 Fiber Optic Cable (S Mode) (12 Fiber) Lin Foot =============================================== IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 4,200.00 6.50 4.00 4.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 65.00 2.00 8.63 4.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4,265.00 6.43 4.11 4.01 ITS SW00-457 DRCOG REGION 08/09/07 6,825.00 6.00 4.95 2.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6,825.00 6.00 4.95 2.90 IM 0703-336 WB I-70 AT M.P. 259.70 AND M. 10/18/07 885.00 6.00 6.50 4.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 885.00 6.00 6.50 4.70 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,975.00 6.15 4.88 3.43 =============== 614-87020 Optical Transceiver Each =================================================== STA 0703-312 I-70 HIDDEN VALLEY AND FALL R 05/17/07 4.00 2743.05 1100.00 1100.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 389 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-87020 Optical Transceiver Each =================================================== ITSSW00-378 VMS REPLACEMENT IN REGIONS 1, 06/21/07 4.00 1000.00 2204.80 3224.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 1871.53 1928.60 2162.20 ITS SW00-457 DRCOG REGION 08/09/07 16.00 4000.00 4150.85 3655.70 ITSSW00-455 VMS REPLACEMENT IN REGIONS 1, 08/30/07 2.00 3000.00 3157.50 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 18.00 3888.89 4040.48 3371.73 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26.00 3268.16 3390.67 2999.57 =============== 614-87028 Video Optic Transceiver Each =================================================== ITSSW00-455 VMS REPLACEMENT IN REGIONS 1, 08/30/07 6.00 3000.00 2175.00 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 3000.00 2175.00 1100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 3000.00 2175.00 1100.00 =============== 614-87100 Auto Traf Rec Sta Each =================================================== ITS SW00-457 DRCOG REGION 08/09/07 1.00 1000.00 3752.25 4574.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1000.00 3752.25 4574.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1000.00 3752.25 4574.50 =============== 614-87321 CCTV (Inst) Each =================================================== ITS SW00-457 DRCOG REGION 08/09/07 8.00 1500.00 1281.10 1447.20 ITSSW00-455 VMS REPLACEMENT IN REGIONS 1, 08/30/07 3.00 1500.00 862.00 810.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 11.00 1500.00 1166.80 1273.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 1500.00 1166.80 1273.42 =============== 614-87325 CCTV Pole Each =================================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 2.00 15000.00 15012.97 20023.39 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 390 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-87325 CCTV Pole Each =================================================== ITSSW00-378 VMS REPLACEMENT IN REGIONS 1, 06/21/07 1.00 4000.00 4175.80 1922.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 11333.33 12057.38 13989.73 ITS SW00-457 DRCOG REGION 08/09/07 1.00 4500.00 5241.20 4132.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 4500.00 5241.20 4132.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 9625.00 11008.74 11525.40 =============== 614-87326 CCTV Pole (Install Only) Each =================================================== ITS SW00-457 DRCOG REGION 08/09/07 4.00 1500.00 1661.45 1782.90 ITSSW00-455 VMS REPLACEMENT IN REGIONS 1, 08/30/07 4.00 1500.00 3311.00 2130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 1500.00 2486.23 1956.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 1500.00 2486.23 1956.45 =============== 614-87333 CCTV Camera (Traf Surveil) Each =================================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 5.00 7500.00 8079.51 8290.03 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 7500.00 8079.51 8290.03 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 7500.00 8079.51 8290.03 =============== 614-87335 Video Switch (System) Each =================================================== ITS SW00-457 DRCOG REGION 08/09/07 1.00 25000.00 28637.85 25175.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 25000.00 28637.85 25175.70 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 25000.00 28637.85 25175.70 =============== 614-87350 Test Fiber Optic Cable LUMP SUM =============================================== STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 1.00 5000.00 4036.33 2550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 5000.00 4036.33 2550.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 391 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-87350 Test Fiber Optic Cable LUMP SUM =============================================== ITSSW00-455 VMS REPLACEMENT IN REGIONS 1, 08/30/07 1.00 600.00 6887.50 9550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 600.00 6887.50 9550.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 2800.00 5176.80 6050.00 =============== 614-87401 Fiber Optic Cable (Spec) Lin Foot =============================================== NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 7,300.00 2.50 2.20 2.11 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7,300.00 2.50 2.20 2.11 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,300.00 2.50 2.20 2.11 =============== 614-87406 Fiber Optic Cable (S Mode) (6 S) Lin Foot =============================================== ITSSW00-378 VMS REPLACEMENT IN REGIONS 1, 06/21/07 1,000.00 8.00 11.87 9.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,000.00 8.00 11.87 9.60 ITSSW00-455 VMS REPLACEMENT IN REGIONS 1, 08/30/07 3,535.00 7.00 7.00 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,535.00 7.00 7.00 5.00 IM 0703-336 WB I-70 AT M.P. 259.70 AND M. 10/18/07 625.00 5.50 6.07 4.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 625.00 5.50 6.07 4.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,160.00 7.01 7.98 5.84 =============== 614-87407 Fiber Optic Cable (M Mode) (6 S) Lin Foot =============================================== STA 0703-312 I-70 HIDDEN VALLEY AND FALL R 05/17/07 1,115.00 5.79 8.50 8.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,115.00 5.79 8.50 8.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,115.00 5.79 8.50 8.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 392 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-87424 Fiber Optic Cable (S Mode) (24 S) Lin Foot =============================================== STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 1,425.00 2.50 4.53 2.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,425.00 2.50 4.53 2.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,425.00 2.50 4.53 2.75 =============== 614-87448 Fiber Optic Cable (S Mode) (48 S) Lin Foot =============================================== STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 3,460.00 2.50 4.65 1.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,460.00 2.50 4.65 1.90 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,460.00 2.50 4.65 1.90 =============== 614-87498 Fiber Optic Cable (S Mode) (144 S) Lin Foot =============================================== IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 5,900.00 5.50 11.50 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,900.00 5.50 11.50 11.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,900.00 5.50 11.50 11.00 =============== 614-87660 Video Encoder/Decoder Each =================================================== ITS SW00-457 DRCOG REGION 08/09/07 2.00 5000.00 2932.18 3814.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 5000.00 2932.18 3814.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 5000.00 2932.18 3814.35 =============== 615-00030 Emb Prot Ty 3 Each =================================================== STA 069A-021 SH 69, W. OF WALSENBURG 01/25/07 10.00 1100.00 1080.75 800.00 NH 0402-070 US 40 ROUTT COUNTY 02/08/07 9.00 1200.00 1202.50 405.00 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 3.00 1100.00 1130.33 1150.00 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 4.00 2000.00 1066.67 900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 26.00 1273.08 1113.88 719.04 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 393 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 615-00030 Emb Prot Ty 3 Each =================================================== HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 1.00 1350.14 1477.09 1500.00 NH 0405-025 KIT CARSON BRIDGE 04/26/07 3.00 1118.85 1020.54 1000.00 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 8.00 1200.00 970.17 826.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 1.00 1500.00 1441.76 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 13.00 1215.90 1055.23 969.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 39.00 1254.02 1087.69 802.64 =============== 615-00050 Emb Prot Ty 5 Each =================================================== NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 1.00 1250.00 631.40 750.00 STA 086A-045 SH 86 - FRANKTOWN TO ELBERT C 02/01/07 1.00 1400.00 3380.00 3900.00 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 1.00 1400.00 1231.17 1250.00 IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 1.00 900.00 2831.71 3750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 1237.50 2158.57 2412.50 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 8.00 1100.00 2777.01 1511.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 1100.00 2777.01 1511.55 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 2.00 1098.25 1516.25 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 1098.25 1516.25 250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 1139.04 2298.47 1588.74 =============== 615-00150 Emb Prot (Spec) Each =================================================== NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 1.00 1500.00 1779.75 1515.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1500.00 1779.75 1515.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 11.00 600.00 714.08 550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 11.00 600.00 714.08 550.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 394 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 615-00150 Emb Prot (Spec) Each =================================================== STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 4.00 1486.50 1306.25 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 1486.50 1306.25 1000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 877.88 1023.15 722.81 =============== 616-00180 18 In Conc Siphon Pipe Lin Foot =============================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 505.00 65.00 68.73 49.91 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 505.00 65.00 68.73 49.91 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 505.00 65.00 68.73 49.91 =============== 616-00240 24 In Conc Siphon Pipe Lin Foot =============================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 164.00 65.00 84.69 61.74 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 164.00 65.00 84.69 61.74 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 164.00 65.00 84.69 61.74 =============== 616-00300 30 In Conc Siphon Pipe Lin Foot =============================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 858.00 100.00 88.58 63.33 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 858.00 100.00 88.58 63.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 858.00 100.00 88.58 63.33 =============== 616-00360 36 In Conc Siphon Pipe Lin Foot =============================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 260.00 115.00 125.58 77.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 260.00 115.00 125.58 77.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 260.00 115.00 125.58 77.80 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 395 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 616-30018 18 In Trash Guard Each =================================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 3.00 700.00 496.46 378.33 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 700.00 496.46 378.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 700.00 496.46 378.33 =============== 616-30024 24 In Trash Guard Each =================================================== NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 2.00 750.00 1035.97 1105.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 750.00 1035.97 1105.15 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 2.00 750.00 534.90 411.58 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 750.00 534.90 411.58 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 750.00 749.64 758.37 =============== 616-30030 30 In Trash Guard Each =================================================== NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 1.00 1000.00 1590.34 1973.26 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1000.00 1590.34 1973.26 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 4.00 800.00 676.15 544.61 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 800.00 676.15 544.61 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 840.00 820.50 830.34 =============== 616-30036 36 In Trash Guard Each =================================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 2.00 900.00 742.67 489.18 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 900.00 742.67 489.18 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 900.00 742.67 489.18 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 396 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 617-00012 12 In Culvert Pipe Lin Foot =============================================== STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 144.00 46.00 37.96 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 144.00 46.00 37.96 35.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 50.00 50.00 57.37 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 50.00 50.00 57.37 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 194.00 47.03 41.61 38.87 =============== 617-00018 18 In Culvert Pipe Lin Foot =============================================== HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 140.00 45.56 64.07 97.00 BR 059A-032 ON SH 59 IN SEDGWICK COUNTY 06/07/07 29.00 50.00 94.13 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 169.00 46.32 69.82 89.79 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 169.00 46.32 69.82 89.79 =============== 617-00024 24 In Culvert Pipe Lin Foot =============================================== CR100-126 WEST OF KIT CARSON 08/16/07 244.00 48.64 84.16 81.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 244.00 48.64 84.16 81.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 244.00 48.64 84.16 81.00 =============== 617-00030 30 In Culvert Pipe Lin Foot =============================================== CR100-126 WEST OF KIT CARSON 08/16/07 186.00 55.66 160.33 192.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 186.00 55.66 160.33 192.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 186.00 55.66 160.33 192.00 =============== 617-00036 36 In Culvert Pipe Lin Foot =============================================== CR100-126 WEST OF KIT CARSON 08/16/07 36.00 77.80 210.53 205.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 36.00 77.80 210.53 205.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 36.00 77.80 210.53 205.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 397 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 617-00042 42 In Culvert Pipe Lin Foot =============================================== CR100-126 WEST OF KIT CARSON 08/16/07 20.00 96.35 194.08 220.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20.00 96.35 194.08 220.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 96.35 194.08 220.00 =============== 617-03000 Detour Culvert Pipe LUMP SUM =============================================== STA 0661-009 ON SH 66 IN WELD COUNTY 02/01/07 1.00 10000.00 25242.95 15000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 10000.00 25242.95 15000.00 BR 059A-032 ON SH 59 IN SEDGWICK COUNTY 06/07/07 1.00 12500.00 21978.53 28000.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 1.00 2500.00 14233.54 1350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 7500.00 19396.87 14675.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 8333.33 22054.18 14783.33 =============== 617-03010 Detour Culvert Pipe Lin Foot =============================================== BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 2,210.00 120.00 62.28 64.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 3,555.00 80.00 41.89 36.06 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,765.00 95.33 51.73 46.77 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 508.00 60.00 47.18 56.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 508.00 60.00 47.18 56.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,273.00 92.47 51.21 47.55 =============== 618-00002 Prestress Steel Strand M Kip Foot ============================================= IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 14,824.00 55.00 25.86 21.94 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 14,824.00 55.00 25.86 21.94 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 398 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 618-00002 Prestress Steel Strand M Kip Foot ============================================= BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 47,214.50 60.00 40.63 52.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 47,214.50 60.00 40.63 52.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 62,038.50 58.81 34.93 44.82 =============== 618-00005 Prestress Steel Bar M Kip Foot ============================================= BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 239.60 300.00 196.70 249.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 239.60 300.00 196.70 249.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 239.60 300.00 196.70 249.00 =============== 618-00142 Prestress Conc I (BT42) Lin Foot =============================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 3,730.00 165.00 204.67 159.66 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,730.00 165.00 204.67 159.66 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,730.00 165.00 204.67 159.66 =============== 618-00163 Prestress Conc I (BT63) Lin Foot =============================================== NH 0405-025 KIT CARSON BRIDGE 04/26/07 2,387.00 150.53 193.65 180.00 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 1,445.00 200.00 184.85 174.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,832.00 169.18 189.46 177.93 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,832.00 169.18 189.46 177.93 =============== 618-00172 Prestress Conc I (BT72) Lin Foot =============================================== BR 0253-192 I-25&128TH 08/16/07 2,412.00 175.00 161.14 170.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,412.00 175.00 161.14 170.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,412.00 175.00 161.14 170.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 399 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 618-01992 Prestress Conc Box (Depth Less Than 32") Sq Foot ================================================ BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 6,252.00 50.00 53.23 47.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6,252.00 50.00 53.23 47.50 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 12,487.00 40.00 42.30 42.00 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 7,565.00 41.00 55.35 52.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 10,054.00 42.00 44.86 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 30,106.00 40.92 46.17 43.84 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 36,358.00 42.48 47.31 44.47 =============== 618-01994 Prestress Conc Box (Depth 32" Thru 48") Sq Foot ================================================ IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 16,362.00 45.00 56.10 49.89 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16,362.00 45.00 56.10 49.89 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16,362.00 45.00 56.10 49.89 =============== 618-08900 Ground Anchor Lin Foot =============================================== STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 180.00 90.00 91.25 86.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 180.00 90.00 91.25 86.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 180.00 90.00 91.25 86.00 =============== 618-09040 Anchor Test Each =================================================== STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 1.00 15000.00 3537.50 3500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 15000.00 3537.50 3500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 15000.00 3537.50 3500.00 =============== 618-10200 Precast Conc U Girder (Pre and Post-Ten) Lin Foot =============================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 2,651.00 200.00 517.88 454.02 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,651.00 200.00 517.88 454.02 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,651.00 200.00 517.88 454.02 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 400 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 619-00002 Water Service Each =================================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 3.00 2500.00 4017.50 3882.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 2500.00 4017.50 3882.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 2500.00 4017.50 3882.50 =============== 619-00007 Connect To Existing Waterline Each =================================================== CC 0821-084 SH82 ASPEN 12/20/07 1.00 2000.00 7876.67 5060.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 2000.00 7876.67 5060.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2000.00 7876.67 5060.00 =============== 619-00010 Water Line (Spec) LUMP SUM =============================================== STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 1.00 9142.75 11450.00 8000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 9142.75 11450.00 8000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 9142.75 11450.00 8000.00 =============== 619-06120 12 In Duct Iron Pipe Lin Foot =============================================== BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 318.00 100.00 168.68 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 318.00 100.00 168.68 150.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 318.00 100.00 168.68 150.00 =============== 619-06160 16 In Duct Iron Pipe Lin Foot =============================================== BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 8.00 100.00 514.38 275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8.00 100.00 514.38 275.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 100.00 514.38 275.00 =============== 619-07080 Place 8 In Duct Iron Pipe Lin Foot =============================================== CC 0821-084 SH82 ASPEN 12/20/07 37.00 50.00 216.58 159.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 37.00 50.00 216.58 159.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 37.00 50.00 216.58 159.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 401 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 619-07120 Place 12 In Duct Iron Pipe Lin Foot =============================================== CC 0821-084 SH82 ASPEN 12/20/07 42.00 70.00 271.08 181.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 42.00 70.00 271.08 181.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 42.00 70.00 271.08 181.50 =============== 619-10220 22 In Weld Steel Pipe Lin Foot =============================================== BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 45.00 160.00 252.74 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 45.00 160.00 252.74 200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 45.00 160.00 252.74 200.00 =============== 619-10240 24 In Weld Steel Pipe Lin Foot =============================================== BR 0253-192 I-25&128TH 08/16/07 34.00 145.00 378.21 305.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 34.00 145.00 378.21 305.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 34.00 145.00 378.21 305.00 =============== 619-10360 36 In Weld Steel Pipe Lin Foot =============================================== BR 0253-192 I-25&128TH 08/16/07 56.00 250.00 375.31 370.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 56.00 250.00 375.31 370.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 56.00 250.00 375.31 370.00 =============== 619-10847 84 In Weld Steel Pipe (J) Lin Foot =============================================== BR 0241-047 US 24, 2 MI S OF GRANITE, CHA 11/15/07 163.00 1500.00 2667.55 1416.82 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 163.00 1500.00 2667.55 1416.82 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 163.00 1500.00 2667.55 1416.82 =============== 619-30320 4 In Galv Pipe Lin Foot =============================================== STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 225.00 80.00 53.75 85.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 225.00 80.00 53.75 85.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 225.00 80.00 53.75 85.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 402 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 619-30640 8 In Galv Pipe Lin Foot =============================================== C 0504-055 PUEBLO COUNTY, US-50C AT SALT 11/01/07 170.00 100.00 83.00 97.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 170.00 100.00 83.00 97.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 170.00 100.00 83.00 97.00 =============== 619-50080 1 In Plastic Pipe Lin Foot =============================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 6,445.00 2.00 1.27 0.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6,445.00 2.00 1.27 0.70 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 2,290.00 1.25 2.36 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,290.00 1.25 2.36 5.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,735.00 1.80 1.72 1.83 =============== 619-50100 1-1/4 In Plastic Pipe Lin Foot =============================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 2,270.00 3.00 1.90 1.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,270.00 3.00 1.90 1.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,270.00 3.00 1.90 1.50 =============== 619-50120 1-1/2 In Plastic Pipe Lin Foot =============================================== STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 190.00 8.75 3.57 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 190.00 8.75 3.57 5.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 190.00 8.75 3.57 5.00 =============== 619-50160 2 In Plastic Pipe Lin Foot =============================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 450.00 8.00 3.39 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 450.00 8.00 3.39 3.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 403 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 619-50160 2 In Plastic Pipe Lin Foot =============================================== STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 100.00 10.25 4.05 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 100.00 10.25 4.05 5.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 550.00 8.41 3.59 3.36 =============== 619-50200 2-1/2 In Plastic Pipe Lin Foot =============================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 490.00 5.00 3.78 3.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 490.00 5.00 3.78 3.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 490.00 5.00 3.78 3.50 =============== 619-50240 3 In Plastic Pipe Lin Foot =============================================== STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 100.00 13.00 6.96 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 100.00 13.00 6.96 6.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 100.00 13.00 6.96 6.00 =============== 619-50480 6 In Plastic Pipe Lin Foot =============================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 40.00 80.00 266.34 61.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 40.00 80.00 266.34 61.50 CC 0821-084 SH82 ASPEN 12/20/07 180.00 150.00 42.00 27.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 180.00 150.00 42.00 27.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 220.00 137.27 70.95 33.68 =============== 619-50640 8 In Plastic Pipe Lin Foot =============================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 120.00 90.00 175.70 73.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 120.00 90.00 175.70 73.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 120.00 90.00 175.70 73.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 404 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 619-51300 20 In Plastic Pipe Lin Foot =============================================== STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 400.00 110.00 172.64 75.56 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 400.00 110.00 172.64 75.56 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 400.00 110.00 172.64 75.56 =============== 619-71516 2 In Air and Vacuum Valve Each =================================================== BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 1.00 3000.00 4170.49 4000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 3000.00 4170.49 4000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 3000.00 4170.49 4000.00 =============== 619-75048 6 In Gate Valve Each =================================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 1.00 800.00 2721.71 2579.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 800.00 2721.71 2579.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 800.00 2721.71 2579.00 =============== 619-75064 8 In Gate Valve Each =================================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 2.00 1500.00 2938.67 2789.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 1500.00 2938.67 2789.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1500.00 2938.67 2789.50 =============== 619-75096 12 In Gate Valve Each =================================================== BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 2.00 3000.00 3457.06 2200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 3000.00 3457.06 2200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 3000.00 3457.06 2200.00 =============== 619-76120 12 In Btrfly Valve Each =================================================== CC 0821-084 SH82 ASPEN 12/20/07 1.00 3000.00 4239.50 2860.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 3000.00 4239.50 2860.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 3000.00 4239.50 2860.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 405 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 619-76129 Inst 16 In Btrfly Valve Each =================================================== CC 0821-084 SH82 ASPEN 12/20/07 1.00 4000.00 3045.33 5170.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 4000.00 3045.33 5170.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 4000.00 3045.33 5170.00 =============== 620-00001 Field Office (CL 1) Each =================================================== STA 0661-009 ON SH 66 IN WELD COUNTY 02/01/07 1.00 12000.00 9354.73 2700.00 HB 065A-019 SH 65 THRU CEDAREDGE 03/08/07 1.00 15000.00 17200.00 9700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 13500.00 12296.71 6200.00 NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 1.00 15000.00 21400.00 21600.00 STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 1.00 8929.33 18790.00 9750.00 STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 1.00 12065.33 7497.50 3795.00 NH 3851-016 US 385 NORTH OF BURLINGTON 05/24/07 1.00 10709.31 11766.67 8800.00 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 1.00 15000.00 17500.00 15000.00 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 1.00 8000.00 14666.67 7000.00 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 1.00 15000.00 21645.66 11121.61 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7.00 12100.57 17706.33 11009.52 C065A-020 SH65 GRAND MESA SLIDE REPAIR 07/26/07 1.00 15000.00 19000.00 7000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 15000.00 19000.00 7000.00 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 1.00 10000.00 15316.67 16666.67 BR 0241-047 US 24, 2 MI S OF GRANITE, CHA 11/15/07 1.00 15000.00 12562.69 17387.55 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 1.00 18000.00 18348.96 25282.51 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 14333.33 15274.26 19778.91 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13.00 13054.15 15692.55 11984.87 =============== 620-00002 Field Office (CL 2) Each =================================================== HB 0063-021 US 6: RIFLE TO NEW CASTLE 01/04/07 1.00 18000.00 17600.00 20200.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 406 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 620-00002 Field Office (CL 2) Each =================================================== STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 1.00 15000.00 12043.00 10000.00 IM 0702-269 I 70 IN EAGLE COUNTY 01/11/07 1.00 15000.00 22500.00 20000.00 STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 1.00 17000.00 16916.67 9000.00 NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 1.00 15000.00 21025.00 7600.00 BR 109A-018 SH 109 LA JUNTA, SH50, MANZI 01/11/07 1.00 16000.00 32466.75 48933.50 STA 012A-042 SH 12, S. OF LA VETA 01/18/07 1.00 18000.00 14611.67 12720.00 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 1.00 12000.00 15185.00 17000.00 STA 069A-021 SH 69, W. OF WALSENBURG 01/25/07 1.00 16000.00 13662.50 12000.00 NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 1.00 15000.00 8950.00 6500.00 IM 0253-194 ON I-25 IN WELD COUNTY 01/25/07 1.00 12000.00 24333.33 20000.00 NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 1.00 12000.00 9100.00 9100.00 STA 086A-045 SH 86 - FRANKTOWN TO ELBERT C 02/01/07 1.00 15000.00 17574.00 15000.00 STA 1251-005 SH 125 AND 127 NORTH OF COWDR 02/08/07 1.00 20000.00 17958.33 14500.00 NH 0402-070 US 40 ROUTT COUNTY 02/08/07 1.00 20000.00 11750.00 8500.00 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 1.00 15000.00 19161.25 14500.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 1.00 20000.00 31350.00 17050.00 IM0252-388 I-25 LARKSPUR INTERCHANGE NOR 03/08/07 1.00 20000.00 15351.35 8400.00 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 1.00 17000.00 16133.33 14000.00 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 1.00 25000.00 26333.33 24000.00 STA0091-030 SH 9 BETWEEN FAIRPLAY AND ALM 03/22/07 1.00 18000.00 14324.40 12962.00 IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 1.00 18000.00 26067.04 20500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 22.00 16772.73 18157.52 15566.61 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 1.00 11440.96 32469.39 40000.00 NH 0405-025 KIT CARSON BRIDGE 04/26/07 1.00 19100.00 25331.25 35000.00 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 1.00 15000.00 18033.33 15000.00 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 1.00 10.00 9177.50 10310.00 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 1.00 20000.00 21689.48 25366.00 SHE0761-193 I-76: SHERIDAN TO I-25 (M.P. 05/17/07 1.00 10000.00 13843.60 14818.00 IM0703-317 FROM MP 221.30 TO MP 251.30 J 05/17/07 1.00 14709.38 11818.33 20000.00 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 1.00 20000.00 39796.05 36427.00 STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 1.00 12000.00 13801.67 12000.00 NH0341-071 US 34: GARFIELD TO MORNING DR 06/14/07 1.00 8000.00 11333.33 8000.00 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 1.00 10000.00 25905.00 23000.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 1.00 15000.00 15148.50 15000.00 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 1.00 18148.39 24930.34 15008.11 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 1.00 15000.00 37300.00 38000.00 CR600-285 VARIOUS LOCATIONS IN REGION 6 06/28/07 1.00 12000.00 17246.67 10990.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 15.00 13360.58 22419.68 21261.27 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 1.00 30000.00 29582.16 18407.28 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 407 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 620-00002 Field Office (CL 2) Each =================================================== STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 1.00 15000.00 17764.99 12000.00 BR 0253-192 I-25&128TH 08/16/07 1.00 30000.00 37849.03 35000.00 CR100-126 WEST OF KIT CARSON 08/16/07 1.00 22875.00 13412.50 12000.00 C0701-190 26.5 ROAD/I-70 BRIDGE REPAIR 08/27/07 1.00 14900.00 11813.17 14900.00 IM0703-323 GEORGETOWN HILL CHUTE 2 AND 3 08/30/07 1.00 14788.51 20026.57 16256.28 C0701-187 I-70 20 ROAD BRIDGE REPAIR 09/06/07 1.00 12000.00 21776.80 15000.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 1.00 55000.00 37218.25 44400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 24320.44 24781.06 20995.45 STA 340A-013 SH 340 IN FRUITA 10/25/07 1.00 20000.00 24675.00 30000.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 1.00 18916.00 31225.00 25000.00 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 1.00 12000.00 26878.92 32600.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 1.00 60000.00 60626.62 40000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 27729.00 36397.22 31900.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 49.00 17854.86 22490.91 19529.55 =============== 620-00005 Field Office (Spec) Each =================================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 1.00 50000.00 159031.14 150574.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 50000.00 159031.14 150574.05 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 1.00 80000.00 115372.37 141737.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 80000.00 115372.37 141737.00 CC 0821-084 SH82 ASPEN 12/20/07 1.00 60000.00 27350.00 23900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 60000.00 27350.00 23900.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 63333.33 90122.43 105403.68 =============== 620-00011 Field Lab (CL 1) Each =================================================== STA 012A-042 SH 12, S. OF LA VETA 01/18/07 1.00 12000.00 15222.00 12720.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 408 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 620-00011 Field Lab (CL 1) Each =================================================== STA 069A-021 SH 69, W. OF WALSENBURG 01/25/07 1.00 12000.00 12100.00 12000.00 STA0091-030 SH 9 BETWEEN FAIRPLAY AND ALM 03/22/07 1.00 14000.00 12397.00 7950.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 12666.67 13447.80 10890.00 STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 1.00 9361.33 8097.50 3795.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 9361.33 8097.50 3795.00 C065A-020 SH65 GRAND MESA SLIDE REPAIR 07/26/07 1.00 12500.00 8666.67 6000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 12500.00 8666.67 6000.00 SHE 160A-009 U.S. 160 MP 94.15 - MP 96.63 12/20/07 1.00 13000.00 11442.30 10576.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 13000.00 11442.30 10576.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 12143.56 12070.05 8840.17 =============== 620-00012 Field Lab (CL 2) Each =================================================== HB 0063-021 US 6: RIFLE TO NEW CASTLE 01/04/07 1.00 15000.00 16683.33 20200.00 STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 1.00 16000.00 11086.00 9000.00 IM 0702-269 I 70 IN EAGLE COUNTY 01/11/07 1.00 15000.00 20500.00 21000.00 STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 1.00 16000.00 13653.33 9000.00 NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 1.00 15000.00 14058.33 5900.00 BR 109A-018 SH 109 LA JUNTA, SH50, MANZI 01/11/07 1.00 17000.00 20403.13 23806.25 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 1.00 12000.00 19080.00 14000.00 NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 1.00 12000.00 8075.00 6500.00 IM 0253-194 ON I-25 IN WELD COUNTY 01/25/07 1.00 12000.00 20333.33 15000.00 NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 1.00 12000.00 8800.00 8800.00 STA 086A-045 SH 86 - FRANKTOWN TO ELBERT C 02/01/07 1.00 18000.00 12774.00 12000.00 STA 1251-005 SH 125 AND 127 NORTH OF COWDR 02/08/07 1.00 15000.00 16166.67 13500.00 NH 0402-070 US 40 ROUTT COUNTY 02/08/07 1.00 15000.00 12000.00 9000.00 HB 149A-023 SOUTH FORK TO CREEDE - SHOULD 02/08/07 1.00 10000.00 14268.33 12000.00 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 1.00 15000.00 14572.40 9000.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 1.00 20000.00 21558.33 14675.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 409 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 620-00012 Field Lab (CL 2) Each =================================================== IM0252-388 I-25 LARKSPUR INTERCHANGE NOR 03/08/07 1.00 15000.00 16051.72 5900.00 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 1.00 10000.00 12073.13 16000.00 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 1.00 16000.00 15484.22 11000.00 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 1.00 16000.00 14116.67 12000.00 HB 065A-019 SH 65 THRU CEDAREDGE 03/08/07 1.00 15000.00 17148.50 13700.00 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 1.00 20000.00 23666.67 16000.00 IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 1.00 15000.00 16136.08 11000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 23.00 14869.57 15355.83 12564.40 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 1.00 10979.50 18401.92 13000.00 NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 1.00 15000.00 20650.00 21600.00 NH 030A-025 SH30 (HAVANA)- PARKER TO FLOR 04/19/07 1.00 12000.00 18886.43 9500.00 NH 0405-025 KIT CARSON BRIDGE 04/26/07 1.00 15583.33 16168.75 12500.00 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 1.00 15000.00 19761.33 15000.00 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 1.00 10000.00 9965.00 11560.00 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 1.00 15000.00 15701.91 26616.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 1.00 25000.00 46770.81 30114.81 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 1.00 14000.00 26212.71 29736.00 NH 3851-016 US 385 NORTH OF BURLINGTON 05/24/07 1.00 12642.11 12100.00 7300.00 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 1.00 12000.00 20000.00 20000.00 IM 0253-196 I-25: 48TH AVE TO US 36 225: 05/31/07 1.00 12000.00 15213.00 9900.00 STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 1.00 12000.00 13626.67 10000.00 BR 059A-032 ON SH 59 IN SEDGWICK COUNTY 06/07/07 1.00 12000.00 13213.19 15000.00 IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 1.00 9000.00 35000.00 40000.00 NH0341-071 US 34: GARFIELD TO MORNING DR 06/14/07 1.00 8000.00 10600.00 8000.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 1.00 15000.00 15488.81 15000.00 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 1.00 15792.71 17981.37 19206.03 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 1.00 13000.00 22500.00 30000.00 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 1.00 17000.00 21916.83 10903.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20.00 13549.88 19049.26 17746.83 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 1.00 30000.00 26003.86 14780.91 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 1.00 14000.00 18281.76 20000.00 BR 0253-192 I-25&128TH 08/16/07 1.00 30000.00 19510.23 30000.00 CR100-126 WEST OF KIT CARSON 08/16/07 1.00 15697.13 12937.50 12000.00 C0701-190 26.5 ROAD/I-70 BRIDGE REPAIR 08/27/07 1.00 8900.00 9740.50 8900.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 1.00 35000.00 44668.44 85511.50 C0701-187 I-70 20 ROAD BRIDGE REPAIR 09/06/07 1.00 14000.00 18618.20 15000.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 1.00 13500.00 25509.75 14100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 20137.14 22414.90 25036.55 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 410 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 620-00012 Field Lab (CL 2) Each =================================================== C R400-217 SIGNALS @ SH66 & CR13 10/04/07 1.00 12000.00 14032.75 3800.00 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 1.00 10000.00 17416.67 16666.67 STA 340A-013 SH 340 IN FRUITA 10/25/07 1.00 15000.00 20050.00 35000.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 1.00 17131.50 21193.75 20000.00 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 1.00 10000.00 17700.62 13700.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 1.00 35000.00 32217.80 40000.00 CC 0821-084 SH82 ASPEN 12/20/07 1.00 20000.00 27362.50 19675.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 7.00 17018.79 20832.50 21263.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 58.00 15400.45 18375.23 17121.59 =============== 620-00015 Field Lab (State Furn) Each =================================================== STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 1.00 7000.00 4440.00 3500.00 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 1.00 6300.00 6200.00 3600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 6650.00 5400.00 3550.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 6650.00 5400.00 3550.00 =============== 620-00020 Sanitary Facility Each =================================================== HB 0063-021 US 6: RIFLE TO NEW CASTLE 01/04/07 1.00 2000.00 2175.00 1500.00 NH 0501-054 US 50 IN GUNNISON COUNTY 01/04/07 1.00 1000.00 666.67 200.00 STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 1.00 1400.00 2736.00 3000.00 IM 0702-269 I 70 IN EAGLE COUNTY 01/11/07 1.00 1000.00 1900.00 2300.00 IM 0702-270 I 70 THROUGH GLENWOOD CANYON 01/11/07 1.00 1000.00 1233.33 1300.00 STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 1.00 1500.00 2300.00 3000.00 NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 1.00 1500.00 1536.67 545.00 BR 109A-018 SH 109 LA JUNTA, SH50, MANZI 01/11/07 2.00 1400.00 1255.00 1010.00 STA 012A-042 SH 12, S. OF LA VETA 01/18/07 2.00 1500.00 2438.33 3180.00 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 2.00 1200.00 1304.00 1000.00 STA 069A-021 SH 69, W. OF WALSENBURG 01/25/07 2.00 1500.00 1612.50 2000.00 NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 1.00 1200.00 1525.00 1000.00 IM 0253-194 ON I-25 IN WELD COUNTY 01/25/07 2.00 1200.00 1833.33 800.00 NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 2.00 1200.00 1332.00 1332.00 STA 0661-009 ON SH 66 IN WELD COUNTY 02/01/07 1.00 1500.00 447.66 440.00 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 1.00 1500.00 825.00 500.00 STA 086A-045 SH 86 - FRANKTOWN TO ELBERT C 02/01/07 1.00 1500.00 970.00 1200.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 411 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 620-00020 Sanitary Facility Each =================================================== STA 1251-005 SH 125 AND 127 NORTH OF COWDR 02/08/07 1.00 2000.00 2266.67 3500.00 NH 0402-070 US 40 ROUTT COUNTY 02/08/07 1.00 2000.00 1400.00 2300.00 HB 149A-023 SOUTH FORK TO CREEDE - SHOULD 02/08/07 1.00 2000.00 618.33 300.00 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 1.00 1500.00 1370.08 1250.00 NH 1602-102 WITHIN THE ALAMOSA CITY LIMIT 02/15/07 1.00 1000.00 995.00 990.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 1.00 1500.00 5330.92 1750.00 SHE 5502-054 02/22/07 1.00 1500.00 630.03 150.00 IM0252-388 I-25 LARKSPUR INTERCHANGE NOR 03/08/07 1.00 1200.00 2173.83 2000.00 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 1.00 1600.00 688.13 870.00 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 1.00 1250.00 1372.68 649.50 SHE 1151-018 SH 115 - GUMAER AVENUE EAST 03/08/07 1.00 1500.00 801.00 365.00 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 1.00 1600.00 3725.00 4800.00 HB 065A-019 SH 65 THRU CEDAREDGE 03/08/07 1.00 2000.00 2241.67 800.00 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 1.00 2000.00 2933.33 1300.00 STA0091-030 SH 9 BETWEEN FAIRPLAY AND ALM 03/22/07 1.00 1000.00 1907.00 2350.00 IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 1.00 1500.00 1632.51 1575.00 SHE 0504-050 INTERSECTION OF SH 50B AND SH 03/22/07 1.00 1000.00 1596.78 214.00 STA402A-007 SH 402 & I-25 OFFRAMS AND E. 03/22/07 1.00 850.00 755.00 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 41.00 1417.07 1636.09 1442.50 SHE 165A-011 ALONG SH 165 N/O RYE 04/05/07 1.00 1000.00 870.19 350.00 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 1.00 1070.28 2742.97 2000.00 NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 1.00 2000.00 2750.00 3000.00 NH 030A-025 SH30 (HAVANA)- PARKER TO FLOR 04/19/07 1.00 750.00 1497.39 1800.00 NH 0405-025 KIT CARSON BRIDGE 04/26/07 4.00 2325.71 2270.43 1200.00 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 1.00 500.00 3662.67 1500.00 SHE 0251-175 ALONG I 25 NORTH OF THE CITY 04/26/07 1.00 1000.00 569.95 257.25 STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 1.00 854.31 1639.00 895.00 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 1.00 800.00 742.20 318.80 STA0712-015 SH 71: NEBRASKA STATE LINE SO 05/10/07 1.00 1500.00 375.00 250.00 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 3.00 928.28 1115.93 1510.00 STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 1.00 1381.93 787.50 725.00 SHE0761-193 I-76: SHERIDAN TO I-25 (M.P. 05/17/07 1.00 1200.00 943.55 1117.75 IM0703-317 FROM MP 221.30 TO MP 251.30 J 05/17/07 1.00 1361.90 1000.83 1500.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 2.00 2500.00 4829.31 4517.22 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 1.00 1500.00 3062.99 2123.50 NH 3851-016 US 385 NORTH OF BURLINGTON 05/24/07 2.00 882.55 1550.00 450.00 SHE 133A-032 SH 133 BETWEEN REDSTONE AND M 05/24/07 1.00 1500.00 1313.19 584.75 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 1.00 1500.00 2500.00 1000.00 IM 0253-196 I-25: 48TH AVE TO US 36 225: 05/31/07 3.00 1000.00 885.25 150.00 STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 1.00 1200.00 2315.00 3700.00 BR 059A-032 ON SH 59 IN SEDGWICK COUNTY 06/07/07 1.00 1200.00 848.06 750.00 IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 2.00 925.00 500.00 300.00 NH0341-071 US 34: GARFIELD TO MORNING DR 06/14/07 2.00 1000.00 2133.33 2000.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 412 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 620-00020 Sanitary Facility Each =================================================== SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 1.00 1000.00 900.00 1000.00 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 2.00 1000.00 503.33 260.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 1.00 1000.00 2247.20 3500.00 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 1.00 2282.04 3074.30 1087.54 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 1.00 1200.00 1714.33 1250.00 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 1.00 1500.00 1907.71 1130.00 ITSSW00-378 VMS REPLACEMENT IN REGIONS 1, 06/21/07 2.00 1000.00 1888.90 2516.70 CR600-285 VARIOUS LOCATIONS IN REGION 6 06/28/07 1.00 1000.00 1300.00 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 45.00 1288.96 1754.39 1371.28 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 1.00 2500.00 3662.97 1803.75 BRR500-087 US 160 PAGOSA SPRINGS 07/12/07 1.00 1000.00 1211.00 1022.00 SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 1.00 1000.00 250.00 250.00 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 1.00 1400.00 1433.03 1200.00 C065A-020 SH65 GRAND MESA SLIDE REPAIR 07/26/07 1.00 1500.00 833.33 500.00 NH 5502-055 COALBANK PASS 08/09/07 1.00 1000.00 615.00 230.00 C0702-273 I-70 GLENWOOD CANYON 08/09/07 1.00 2000.00 6242.00 6242.00 BR 0253-192 I-25&128TH 08/16/07 2.00 1500.00 1166.00 1800.00 CR100-126 WEST OF KIT CARSON 08/16/07 4.00 2545.08 2650.00 3500.00 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 1.00 1000.00 1000.00 750.00 C0701-190 26.5 ROAD/I-70 BRIDGE REPAIR 08/27/07 1.00 20.00 423.33 20.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 2.00 3500.00 6572.50 4000.00 IM0703-323 GEORGETOWN HILL CHUTE 2 AND 3 08/30/07 1.00 1032.29 2509.08 956.32 ITSSW00-455 VMS REPLACEMENT IN REGIONS 1, 08/30/07 2.00 2500.00 2250.00 2000.00 IM R400-215 I-25 & I-76 VMS INSTALLATION 09/06/07 2.00 1500.00 542.00 500.00 C0701-187 I-70 20 ROAD BRIDGE REPAIR 09/06/07 1.00 1000.00 1103.60 450.00 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 1.00 1500.00 1564.58 1000.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 1.00 1000.00 2325.00 1300.00 C R600 - 300 VARIOUS LOCATIONS IN REGION 6 09/27/07 1.00 1200.00 1528.40 1280.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 26.00 1743.56 2194.09 1830.93 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 1.00 750.00 1011.09 350.00 BR R300-130 I-70 (VARIOUS LOCATIONS) 10/18/07 1.00 2000.00 883.33 650.00 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 1.00 1000.00 1718.06 2222.22 SHE0092-019 SH 9 NORTH OF SILVERTHORNE, I 10/18/07 1.00 700.00 478.11 340.55 STA 340A-013 SH 340 IN FRUITA 10/25/07 1.00 2000.00 2056.25 5000.00 C 0504-055 PUEBLO COUNTY, US-50C AT SALT 11/01/07 1.00 1000.00 1000.00 500.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 1.00 1600.00 2331.25 2800.00 BR 0241-047 US 24, 2 MI S OF GRANITE, CHA 11/15/07 1.00 1500.00 649.19 1106.48 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 2.00 800.00 1068.12 436.82 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 413 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 620-00020 Sanitary Facility Each =================================================== BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 2.00 800.00 1657.83 720.00 C120A-007 ON SH 120 AT PORTLAND OVER TH 11/29/07 1.00 1500.00 1012.50 3000.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 1.00 1500.00 2300.37 1600.00 CC 0821-084 SH82 ASPEN 12/20/07 2.00 2000.00 2350.00 2275.00 SHE 160A-009 U.S. 160 MP 94.15 - MP 96.63 12/20/07 1.00 1400.00 1634.96 555.28 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 17.00 1302.94 1485.13 1469.89 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 129.00 1423.15 1742.70 1499.55 =============== 621-00200 Haul Road LUMP SUM =============================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 1.00 15000.00 41142.25 15019.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 15000.00 41142.25 15019.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 15000.00 41142.25 15019.00 =============== 621-00425 Detour LUMP SUM =============================================== C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 1.00 125000.00 248889.13 269000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 125000.00 248889.13 269000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 125000.00 248889.13 269000.00 =============== 621-00450 Detour Pvmt Sq Yard ================================================ NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 550.00 25.00 41.30 28.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 550.00 25.00 41.30 28.00 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 377.00 40.03 48.35 30.00 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 13,833.00 30.00 29.92 20.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 101,372.00 40.00 20.01 22.53 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 1,111.00 35.00 28.50 45.50 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 11,450.00 30.00 33.18 29.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 128,143.00 37.98 22.88 23.06 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 414 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 621-00450 Detour Pvmt Sq Yard ================================================ STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 430.00 40.00 44.39 31.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 3,351.00 45.00 39.89 41.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,781.00 44.43 40.51 39.86 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 1,275.00 35.00 35.80 33.18 BR0341-069 ON US 34 IN LARIMER COUNTY . . . 39.90 . CC 0821-084 SH82 ASPEN 12/20/07 1,000.00 34.00 102.17 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,275.00 34.56 59.51 66.95 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 134,749.00 38.05 24.53 24.29 =============== 621-00500 Temp Brdg LUMP SUM =============================================== C120A-007 ON SH 120 AT PORTLAND OVER TH 11/29/07 1.00 500000.00 561250.00 430000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 500000.00 561250.00 430000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 500000.00 561250.00 430000.00 =============== 621-00510 Temp Bridge Sq Foot ================================================ BR0341-069 ON US 34 IN LARIMER COUNTY . . . 164.50 . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER . . 164.50 . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR . . 164.50 . =============== 621-00650 Ped Stair Str LUMP SUM =============================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 1.00 10000.00 23534.69 12968.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 10000.00 23534.69 12968.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 10000.00 23534.69 12968.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 415 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 622-11010 Maint Bldg LUMP SUM =============================================== IM 0703-326 EISENHOWER JOHNSON MEMORIAL T 12/06/07 1.00 75000.00 69991.82 78700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 75000.00 69991.82 78700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 75000.00 69991.82 78700.00 =============== 623-00162 Drip Emit Tubing Lin Foot =============================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 7,900.00 1.25 1.31 0.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7,900.00 1.25 1.31 0.70 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 1,600.00 1.75 1.93 4.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,600.00 1.75 1.93 4.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,500.00 1.33 1.48 1.34 =============== 623-00164 Drip Emit Each =================================================== STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 444.00 1.50 2.46 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 444.00 1.50 2.46 2.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 444.00 1.50 2.46 2.00 =============== 623-00166 3/4 In Emit Valve Assembly Each =================================================== STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 3.00 340.00 200.33 215.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 340.00 200.33 215.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 340.00 200.33 215.00 =============== 623-00168 1 In Emit Valve Assembly Each =================================================== STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 3.00 429.25 362.51 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 429.25 362.51 350.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 429.25 362.51 350.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 416 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 623-00186 3/4 In Flush Unit Each =================================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 20.00 50.00 92.38 61.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20.00 50.00 92.38 61.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 50.00 92.38 61.00 =============== 623-00206 6 In Pop-Up Spray Spr Each =================================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 220.00 25.00 33.80 27.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 220.00 25.00 33.80 27.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 220.00 25.00 33.80 27.50 =============== 623-01708 1 Inch Backflow Preventer Each =================================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 2.00 1300.00 1660.56 1066.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 1300.00 1660.56 1066.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1300.00 1660.56 1066.00 =============== 623-03108 1 In Auto Ctrl Valve Each =================================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 35.00 180.00 196.28 127.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 35.00 180.00 196.28 127.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 35.00 180.00 196.28 127.00 =============== 623-04000 Ctrl Wire 24 Volt Lin Foot =============================================== STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 11,400.00 0.50 0.54 0.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 11,400.00 0.50 0.54 0.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,400.00 0.50 0.54 0.30 =============== 623-04008 1 In Quick-Coupler Each =================================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 9.00 160.00 169.97 76.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9.00 160.00 169.97 76.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 417 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 623-04008 1 In Quick-Coupler Each =================================================== STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 2.00 140.00 170.12 230.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 140.00 170.12 230.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 156.36 170.02 104.00 =============== 623-05010 1-1/4 In Gate Valve Each =================================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 6.00 100.00 145.60 35.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 100.00 145.60 35.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 100.00 145.60 35.50 =============== 623-05012 1-1/2 In Gate Valve Each =================================================== STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 2.00 40.75 103.25 135.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 40.75 103.25 135.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 40.75 103.25 135.00 =============== 623-06900 Valve Box Each =================================================== STA 340A-013 SH 340 IN FRUITA 10/25/07 1.00 90.00 591.25 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 90.00 591.25 1200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 90.00 591.25 1200.00 =============== 623-07500 Soil Moisture Sensor Each =================================================== STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 1.00 600.00 154.19 170.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 600.00 154.19 170.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 600.00 154.19 170.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 418 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 623-08106 6 Station Auto Ctrler Each =================================================== STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 1.00 481.00 1474.21 3500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 481.00 1474.21 3500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 481.00 1474.21 3500.00 =============== 623-08112 12 Station Auto Ctrler Each =================================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 1.00 3000.00 2263.53 1669.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 3000.00 2263.53 1669.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 3000.00 2263.53 1669.00 =============== 623-08124 24 Station Auto Ctrler Each =================================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 1.00 5000.00 3750.60 3285.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 5000.00 3750.60 3285.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5000.00 3750.60 3285.50 =============== 623-09900 Sprinkler System LUMP SUM =============================================== STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 1.00 25000.00 11968.13 9280.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 25000.00 11968.13 9280.00 STA 340A-013 SH 340 IN FRUITA 10/25/07 1.00 10000.00 22271.25 44000.00 CC 0821-084 SH82 ASPEN 12/20/07 1.00 375000.00 225818.42 245910.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 192500.00 144399.55 144955.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 136666.67 85541.14 99730.17 =============== 623-09960 Pump System LUMP SUM =============================================== CC 0821-084 SH82 ASPEN 12/20/07 1.00 32400.00 85458.33 123750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 32400.00 85458.33 123750.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 32400.00 85458.33 123750.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 419 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 624-12054 54 In Culvert Pipe (CR 2) Lin Foot =============================================== BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 480.00 210.00 150.60 151.87 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 480.00 210.00 150.60 151.87 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 480.00 210.00 150.60 151.87 =============== 624-14024 24 In Culvert Pipe (CR 4) Lin Foot =============================================== IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 180.00 90.00 143.33 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 180.00 90.00 143.33 60.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 180.00 90.00 143.33 60.00 =============== 625-00000 Const Surveying LUMP SUM =============================================== STA 0961-012 SH 96, OVERLAY IN PUEBLO 01/04/07 1.00 22000.00 40700.00 28000.00 IM 0702-270 I 70 THROUGH GLENWOOD CANYON 01/11/07 1.00 20000.00 49000.00 22000.00 NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 1.00 10000.00 6281.67 5600.00 STA 012A-042 SH 12, S. OF LA VETA 01/18/07 1.00 10000.00 25108.33 19150.00 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 1.00 35000.00 37600.00 40000.00 STA 069A-021 SH 69, W. OF WALSENBURG 01/25/07 1.00 5000.00 7582.00 6000.00 NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 1.00 50000.00 15033.67 10000.00 IM 0253-194 ON I-25 IN WELD COUNTY 01/25/07 1.00 35000.00 12333.33 10000.00 NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 1.00 40000.00 12565.00 12565.00 STA 0661-009 ON SH 66 IN WELD COUNTY 02/01/07 1.00 7500.00 6101.44 4455.00 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 1.00 30000.00 10459.75 9000.00 NH 0062-023 SH 6, CLEAR CREEK CANYON 02/08/07 1.00 5500.00 14183.33 11000.00 HB 149A-023 SOUTH FORK TO CREEDE - SHOULD 02/08/07 1.00 10000.00 5093.33 5500.00 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 1.00 10000.00 5656.22 5700.00 NH 1602-102 WITHIN THE ALAMOSA CITY LIMIT 02/15/07 1.00 10000.00 12000.00 16500.00 SHE 1151-020 SH 115 VMS, MP 17 AND MP 41 02/15/07 1.00 3000.00 2747.30 1601.78 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 1.00 100000.00 118305.50 107944.50 SHE 5502-054 02/22/07 1.00 5000.00 3951.67 1210.00 IM0252-388 I-25 LARKSPUR INTERCHANGE NOR 03/08/07 1.00 25800.00 10189.87 10000.00 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 1.00 20000.00 11531.25 9300.00 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 1.00 10000.00 17117.00 24890.00 SHE 1151-018 SH 115 - GUMAER AVENUE EAST 03/08/07 1.00 8000.00 7244.83 9679.00 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 1.00 35000.00 21666.67 25000.00 IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 1.00 10000.00 6136.75 7800.00 SHE 0504-050 INTERSECTION OF SH 50B AND SH 03/22/07 1.00 7000.00 12637.14 10489.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 25.00 20952.00 16093.61 16535.39 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 420 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 625-00000 Const Surveying LUMP SUM =============================================== HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 1.00 22865.54 46762.26 40800.00 NH 0405-025 KIT CARSON BRIDGE 04/26/07 1.00 45009.17 91406.25 70000.00 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 1.00 25000.00 72466.67 50000.00 SHE 0251-175 ALONG I 25 NORTH OF THE CITY 04/26/07 1.00 1000.00 7265.74 10395.00 STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 1.00 8642.91 14400.00 7500.00 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 1.00 10000.00 13831.00 9324.00 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 1.00 40000.00 38820.33 31132.00 STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 1.00 26807.50 35640.00 8280.00 SHE0761-193 I-76: SHERIDAN TO I-25 (M.P. 05/17/07 1.00 9000.00 9494.43 2116.15 IM0703-317 FROM MP 221.30 TO MP 251.30 J 05/17/07 1.00 16214.67 29733.33 15000.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 1.00 600000.00 376900.00 325000.00 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 1.00 35000.00 38980.19 33596.00 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 1.00 20000.00 28250.00 16500.00 STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 1.00 30000.00 22567.50 16500.00 BR 059A-032 ON SH 59 IN SEDGWICK COUNTY 06/07/07 1.00 10000.00 8029.00 11000.00 IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 1.00 22500.00 27500.00 25000.00 NH0341-071 US 34: GARFIELD TO MORNING DR 06/14/07 1.00 25000.00 31666.67 40000.00 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 1.00 5000.00 8190.25 5300.00 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 1.00 8000.00 12666.67 13000.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 1.00 125000.00 86800.05 60000.00 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 1.00 36812.70 27226.98 27281.05 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 1.00 20000.00 35233.33 27500.00 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 1.00 30000.00 17932.71 24075.00 CR600-285 VARIOUS LOCATIONS IN REGION 6 06/28/07 1.00 6000.00 8833.33 12000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 24.00 49077.19 42983.91 36720.80 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 1.00 60000.00 110715.97 148050.00 BRR500-087 US 160 PAGOSA SPRINGS 07/12/07 1.00 5000.00 4250.00 6200.00 SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 1.00 3500.00 4500.00 4500.00 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 1.00 40000.00 30454.60 32000.00 C065A-020 SH65 GRAND MESA SLIDE REPAIR 07/26/07 1.00 25000.00 16666.67 20000.00 SHE 0702-267 NEAR VAIL IN EAGLE COUNTY 08/02/07 1.00 105500.00 44370.00 87000.00 NH 5502-055 COALBANK PASS 08/09/07 1.00 4000.00 5000.00 5000.00 BR 0253-192 I-25&128TH 08/16/07 1.00 75000.00 29389.40 20000.00 CR100-126 WEST OF KIT CARSON 08/16/07 1.00 80240.10 98758.90 90000.00 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 1.00 8000.00 22500.00 25000.00 C0701-190 26.5 ROAD/I-70 BRIDGE REPAIR 08/27/07 1.00 5000.00 7121.17 5000.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 1.00 300000.00 320460.00 526840.00 ITSSW00-455 VMS REPLACEMENT IN REGIONS 1, 08/30/07 1.00 4000.00 18500.00 5000.00 C0701-187 I-70 20 ROAD BRIDGE REPAIR 09/06/07 1.00 10000.00 11510.00 10800.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 421 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 625-00000 Const Surveying LUMP SUM =============================================== IM 0703-331 WB I-70 AT M.P. 259.70 AND M. 09/06/07 1.00 5000.00 7361.52 6621.11 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 1.00 25000.00 22447.33 28000.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 1.00 60000.00 43993.38 33600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 17.00 47955.30 57908.85 61977.12 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 1.00 4500.00 10669.18 9700.00 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 1.00 30000.00 25610.75 23958.00 SHE0092-019 SH 9 NORTH OF SILVERTHORNE, I 10/18/07 1.00 5500.00 9685.00 2850.00 STA 340A-013 SH 340 IN FRUITA 10/25/07 1.00 75000.00 71500.00 73000.00 C 0504-055 PUEBLO COUNTY, US-50C AT SALT 11/01/07 1.00 10000.00 7766.67 3700.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 1.00 51083.00 64263.22 55000.00 BR 0241-047 US 24, 2 MI S OF GRANITE, CHA 11/15/07 1.00 7500.00 7133.08 17759.00 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 1.00 35000.00 22998.32 20537.99 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 1.00 30000.00 23473.08 27800.00 SHE 082A-010 SH 82 AND BUFFALO VALLEY ROAD 11/29/07 1.00 3500.00 4132.00 2715.00 STSR400-229 SH 14, SH 93, & SH 157 IN BOU 12/06/07 1.00 12000.00 4045.20 3445.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 1.00 10000.00 43481.51 60000.00 CC 0821-084 SH82 ASPEN 12/20/07 1.00 100000.00 91224.08 63470.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 13.00 28775.62 29811.87 27995.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 79.00 36594.63 33492.35 34332.03 =============== 625-00001 Const Surveying (Hour) Hour =================================================== STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 16.00 150.00 281.25 215.00 STA 086A-045 SH 86 - FRANKTOWN TO ELBERT C 02/01/07 1.00 180.00 222.60 140.00 STA 1251-005 SH 125 AND 127 NORTH OF COWDR 02/08/07 50.00 150.00 250.83 200.00 NH 0402-070 US 40 ROUTT COUNTY 02/08/07 50.00 120.00 245.00 190.00 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 40.00 140.00 180.00 155.00 STA402A-007 SH 402 & I-25 OFFRAMS AND E. 03/22/07 16.00 140.00 205.75 128.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 173.00 138.27 237.42 181.09 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 20.00 147.33 129.44 110.00 NH 030A-025 SH30 (HAVANA)- PARKER TO FLOR 04/19/07 10.00 200.00 202.15 147.00 STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 40.00 133.03 214.00 135.00 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 10.00 140.00 116.72 108.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 80.00 145.85 174.03 126.94 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 422 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 625-00001 Const Surveying (Hour) Hour =================================================== STA 340A-013 SH 340 IN FRUITA 10/25/07 15.00 200.00 150.14 140.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 100.00 150.50 131.38 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 115.00 156.96 132.68 105.22 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 368.00 145.75 177.95 145.61 =============== 626-00000 Mobilization LUMP SUM =============================================== HB 0063-021 US 6: RIFLE TO NEW CASTLE 01/04/07 1.00 360000.00 410313.33 432000.00 STA 0961-012 SH 96, OVERLAY IN PUEBLO 01/04/07 1.00 150000.00 323400.00 240000.00 NH 0501-054 US 50 IN GUNNISON COUNTY 01/04/07 1.00 75000.00 69719.13 85657.40 STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 1.00 400000.00 294038.60 130593.00 IM 0702-269 I 70 IN EAGLE COUNTY 01/11/07 1.00 550000.00 561500.00 480000.00 IM 0702-270 I 70 THROUGH GLENWOOD CANYON 01/11/07 1.00 315000.00 326666.67 240000.00 STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 1.00 175000.00 212212.46 93908.00 NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 1.00 200000.00 120284.76 37800.00 BR 109A-018 SH 109 LA JUNTA, SH50, MANZI 01/11/07 1.00 75000.00 126500.00 155000.00 STA 012A-042 SH 12, S. OF LA VETA 01/18/07 1.00 150000.00 289201.50 270000.00 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 1.00 625000.00 243743.00 255000.00 STA 069A-021 SH 69, W. OF WALSENBURG 01/25/07 1.00 200000.00 297748.50 398000.00 NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 1.00 250000.00 128674.90 124000.00 SHE 0931-027 SH 93 @ SH 72 01/25/07 1.00 10000.00 20946.80 8510.00 IM 0703-319 EJMT 24.9 KV SERVICE 01/25/07 1.00 55000.00 57246.04 50000.00 IM 0253-194 ON I-25 IN WELD COUNTY 01/25/07 1.00 500000.00 780972.33 955000.00 NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 1.00 300000.00 163000.00 163000.00 STA 0661-009 ON SH 66 IN WELD COUNTY 02/01/07 1.00 30000.00 33011.02 25000.00 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 1.00 175000.00 155360.00 20275.00 STA 086A-045 SH 86 - FRANKTOWN TO ELBERT C 02/01/07 1.00 165000.00 136113.40 144922.00 STA 1251-005 SH 125 AND 127 NORTH OF COWDR 02/08/07 1.00 550000.00 437555.50 398533.00 NH 0402-070 US 40 ROUTT COUNTY 02/08/07 1.00 305000.00 345764.25 187000.00 NH 0062-023 SH 6, CLEAR CREEK CANYON 02/08/07 1.00 80000.00 229647.67 140500.00 HB 149A-023 SOUTH FORK TO CREEDE - SHOULD 02/08/07 1.00 60000.00 37368.33 30000.00 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 1.00 100000.00 93302.13 30000.00 NH 1602-102 WITHIN THE ALAMOSA CITY LIMIT 02/15/07 1.00 35000.00 102000.00 54000.00 SHE 1151-020 SH 115 VMS, MP 17 AND MP 41 02/15/07 1.00 20000.00 14435.81 10085.84 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 1.00 530000.00 850000.00 800000.00 SHE 5502-054 02/22/07 1.00 15000.00 20197.79 23500.00 IM0252-388 I-25 LARKSPUR INTERCHANGE NOR 03/08/07 1.00 150000.00 148035.12 130505.39 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 1.00 80000.00 65407.80 34350.00 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 1.00 60000.00 120142.45 108000.00 SHE 1151-018 SH 115 - GUMAER AVENUE EAST 03/08/07 1.00 15000.00 31337.32 21100.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 423 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 626-00000 Mobilization LUMP SUM =============================================== STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 1.00 500000.00 461249.83 145915.00 HB 065A-019 SH 65 THRU CEDAREDGE 03/08/07 1.00 300000.00 332766.67 339000.00 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 1.00 450000.00 521000.00 535000.00 STA0091-030 SH 9 BETWEEN FAIRPLAY AND ALM 03/22/07 1.00 175000.00 194761.20 199160.00 IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 1.00 140000.00 135952.77 118000.00 SHE 0504-050 INTERSECTION OF SH 50B AND SH 03/22/07 1.00 24000.00 45739.69 39621.50 STA402A-007 SH 402 & I-25 OFFRAMS AND E. 03/22/07 1.00 22000.00 19369.50 12478.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 40.00 209275.00 199796.60 191635.35 SHE 165A-011 ALONG SH 165 N/O RYE 04/05/07 1.00 25000.00 29846.50 39000.00 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 1.00 161200.98 289345.19 203126.10 NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 1.00 330000.00 395750.00 320000.00 NH 030A-025 SH30 (HAVANA)- PARKER TO FLOR 04/19/07 1.00 50000.00 83403.01 52000.00 NH 0405-025 KIT CARSON BRIDGE 04/26/07 1.00 495747.17 540048.60 580000.00 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 1.00 250000.00 370784.00 300000.00 SHE 0251-175 ALONG I 25 NORTH OF THE CITY 04/26/07 1.00 50000.00 42343.00 43415.00 STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 1.00 98146.89 138640.00 53000.00 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 1.00 70000.00 70945.00 87780.00 STA0712-015 SH 71: NEBRASKA STATE LINE SO 05/10/07 1.00 51000.00 69384.50 56769.00 STA0631-009 SH 63 IN WASHINGTON COUNTY 05/10/07 1.00 37000.00 41297.50 40000.00 STA0343-029 ON US 34 EAST OF YUMA IN YUMA 05/10/07 1.00 28000.00 82800.00 65600.00 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 1.00 300000.00 300412.85 307000.00 STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 1.00 172515.12 156500.00 90000.00 SHE0761-193 I-76: SHERIDAN TO I-25 (M.P. 05/17/07 1.00 40000.00 59304.13 21712.65 IM0703-317 FROM MP 221.30 TO MP 251.30 J 05/17/07 1.00 107896.06 147333.33 136000.00 STA 0703-312 I-70 HIDDEN VALLEY AND FALL R 05/17/07 1.00 28613.54 6280.00 6280.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 1.00 3000000.00 4298425.00 4556700.00 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 1.00 425000.00 395133.80 254549.00 NH 3851-016 US 385 NORTH OF BURLINGTON 05/24/07 1.00 243668.38 275512.67 115500.00 SHE 133A-032 SH 133 BETWEEN REDSTONE AND M 05/24/07 1.00 45000.00 78557.82 54600.00 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 1.00 80000.00 127500.00 105000.00 CR400-216 SIGNALS @ US34 & SH37, KERSEY 05/24/07 1.00 15000.00 21001.68 22303.35 IM 0253-196 I-25: 48TH AVE TO US 36 225: 05/31/07 1.00 120000.00 923250.00 306000.00 STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 1.00 550000.00 396888.33 226955.00 BR 059A-032 ON SH 59 IN SEDGWICK COUNTY 06/07/07 1.00 42000.00 77641.65 52000.00 IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 1.00 215000.00 125500.00 100000.00 NH0341-071 US 34: GARFIELD TO MORNING DR 06/14/07 1.00 160000.00 209755.00 200000.00 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 1.00 40000.00 60373.25 30400.00 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 1.00 50000.00 61000.00 32000.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 1.00 450000.00 681701.32 400000.00 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 1.00 320069.87 265313.08 135180.06 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 1.00 130000.00 225466.67 160000.00 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 1.00 95000.00 198875.78 203985.48 ITSSW00-378 VMS REPLACEMENT IN REGIONS 1, 06/21/07 1.00 80000.00 109189.90 82569.70 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 424 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 626-00000 Mobilization LUMP SUM =============================================== CR600-285 VARIOUS LOCATIONS IN REGION 6 06/28/07 1.00 40000.00 57616.67 47850.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 36.00 233218.28 337722.92 263535.43 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 1.00 365000.00 540901.34 333292.91 BRR500-087 US 160 PAGOSA SPRINGS 07/12/07 1.00 50000.00 48575.50 53051.00 SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 1.00 15000.00 15500.00 15500.00 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 1.00 100000.00 88050.00 67750.00 C065A-020 SH65 GRAND MESA SLIDE REPAIR 07/26/07 1.00 200000.00 179666.67 168000.00 SHE 0702-267 NEAR VAIL IN EAGLE COUNTY 08/02/07 1.00 173000.00 222448.60 150000.00 NH 5502-055 COALBANK PASS 08/09/07 1.00 40000.00 47500.00 65000.00 ITS SW00-457 DRCOG REGION 08/09/07 1.00 30000.00 35378.73 24197.45 C0702-273 I-70 GLENWOOD CANYON 08/09/07 1.00 400000.00 120000.00 120000.00 BR 0253-192 I-25&128TH 08/16/07 1.00 300000.00 239576.23 180000.00 CR100-126 WEST OF KIT CARSON 08/16/07 1.00 452425.50 686138.92 500000.00 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 1.00 30000.00 96000.00 136000.00 C0701-190 26.5 ROAD/I-70 BRIDGE REPAIR 08/27/07 1.00 107300.00 86100.00 107300.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 1.00 3000000.00 2841070.44 2445000.00 IM0703-323 GEORGETOWN HILL CHUTE 2 AND 3 08/30/07 1.00 79462.85 80271.60 45086.39 ITSSW00-455 VMS REPLACEMENT IN REGIONS 1, 08/30/07 1.00 150000.00 105250.00 75500.00 IM R400-215 I-25 & I-76 VMS INSTALLATION 09/06/07 1.00 50000.00 29973.40 26500.00 C0701-187 I-70 20 ROAD BRIDGE REPAIR 09/06/07 1.00 100000.00 80169.80 98000.00 IM 0703-331 WB I-70 AT M.P. 259.70 AND M. 09/06/07 1.00 20000.00 52926.59 15056.02 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 1.00 100000.00 390671.75 186500.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 1.00 585000.00 463229.88 420919.51 C R600 - 300 VARIOUS LOCATIONS IN REGION 6 09/27/07 1.00 100000.00 211852.00 83300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 22.00 293054.02 353827.02 241634.24 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 1.00 38000.00 54337.93 19000.00 BR R300-130 I-70 (VARIOUS LOCATIONS) 10/18/07 1.00 90000.00 97000.00 78000.00 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 1.00 100000.00 168557.15 179500.00 SHE0092-019 SH 9 NORTH OF SILVERTHORNE, I 10/18/07 1.00 30000.00 51172.00 22960.00 IM 0703-336 WB I-70 AT M.P. 259.70 AND M. 10/18/07 1.00 50000.00 31125.00 24500.00 STA 340A-013 SH 340 IN FRUITA 10/25/07 1.00 200000.00 367500.00 240000.00 C 0504-055 PUEBLO COUNTY, US-50C AT SALT 11/01/07 1.00 40000.00 71000.00 78000.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 1.00 277093.00 522086.03 574483.00 BR 0241-047 US 24, 2 MI S OF GRANITE, CHA 11/15/07 1.00 80000.00 55799.03 53448.25 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 1.00 250000.00 289341.47 274000.00 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 1.00 210000.00 243448.67 232100.00 SHE 082A-010 SH 82 AND BUFFALO VALLEY ROAD 11/29/07 1.00 14000.00 28217.49 33036.97 C120A-007 ON SH 120 AT PORTLAND OVER TH 11/29/07 1.00 20000.00 70750.00 50000.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 425 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 626-00000 Mobilization LUMP SUM =============================================== C0703-338 CLEAR CREEK COUNTY 12/05/07 1.00 50000.00 42123.33 50370.00 STSR400-229 SH 14, SH 93, & SH 157 IN BOU 12/06/07 1.00 35000.00 49005.00 44670.00 IM 0703-326 EISENHOWER JOHNSON MEMORIAL T 12/06/07 1.00 300000.00 119227.93 146300.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 1.00 300000.00 401666.67 392000.00 CC 0821-084 SH82 ASPEN 12/20/07 1.00 525000.00 663450.00 884700.00 SHE 160A-009 U.S. 160 MP 94.15 - MP 96.63 12/20/07 1.00 62000.00 98370.94 34000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 19.00 140583.84 200455.11 179529.91 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 117.00 221240.51 261820.92 221194.11 =============== 626-00010 Erection Equip LUMP SUM =============================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 1.00 1300000.00 898917.60 1100000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1300000.00 898917.60 1100000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1300000.00 898917.60 1100000.00 =============== 626-01000 Public Info Services LUMP SUM =============================================== HB 0063-021 US 6: RIFLE TO NEW CASTLE 01/04/07 1.00 8000.00 9750.00 7000.00 STA 0961-012 SH 96, OVERLAY IN PUEBLO 01/04/07 1.00 10000.00 9105.00 14425.00 IM 0702-269 I 70 IN EAGLE COUNTY 01/11/07 1.00 4000.00 7000.00 9000.00 IM 0702-270 I 70 THROUGH GLENWOOD CANYON 01/11/07 1.00 10000.00 11666.67 20000.00 STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 1.00 5000.00 5635.00 5500.00 NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 1.00 5000.00 5387.50 2300.00 BR 109A-018 SH 109 LA JUNTA, SH50, MANZI 01/11/07 1.00 7000.00 8295.13 8390.25 STA 012A-042 SH 12, S. OF LA VETA 01/18/07 1.00 6000.00 13023.33 4240.00 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 1.00 10000.00 8430.00 4500.00 STA 069A-021 SH 69, W. OF WALSENBURG 01/25/07 1.00 6000.00 3135.00 3000.00 NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 1.00 15000.00 10639.50 7500.00 NH 0402-070 US 40 ROUTT COUNTY 02/08/07 1.00 3000.00 3000.00 1000.00 NH 0062-023 SH 6, CLEAR CREEK CANYON 02/08/07 1.00 8000.00 7605.56 2200.00 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 1.00 5000.00 5286.90 515.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 1.00 90000.00 14156.33 10000.00 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 1.00 5000.00 4334.38 3900.00 HB 065A-019 SH 65 THRU CEDAREDGE 03/08/07 1.00 6000.00 5766.67 5400.00 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 1.00 10000.00 9333.33 5000.00 IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 1.00 5000.00 3215.03 1550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 19.00 11473.68 7282.86 6074.75 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 1.00 10936.36 11046.72 12300.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 426 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 626-01000 Public Info Services LUMP SUM =============================================== NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 1.00 8000.00 7900.00 8600.00 NH 030A-025 SH30 (HAVANA)- PARKER TO FLOR 04/19/07 1.00 5000.00 4210.60 5000.00 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 1.00 8000.00 5933.33 5000.00 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 1.00 3000.00 2281.25 5625.00 SHE0761-193 I-76: SHERIDAN TO I-25 (M.P. 05/17/07 1.00 2500.00 4393.55 1467.75 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 1.00 5000.00 18537.48 15057.41 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 1.00 8000.00 8957.43 7804.50 SHE 133A-032 SH 133 BETWEEN REDSTONE AND M 05/24/07 1.00 2000.00 3261.25 1185.00 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 1.00 7000.00 7500.00 5000.00 IM 0253-196 I-25: 48TH AVE TO US 36 225: 05/31/07 1.00 10000.00 12212.50 4700.00 NH0341-071 US 34: GARFIELD TO MORNING DR 06/14/07 1.00 7500.00 14500.00 7500.00 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 1.00 5000.00 2795.50 2000.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 1.00 5000.00 5653.33 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 14.00 6209.74 7807.87 6017.12 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 1.00 25000.00 12794.96 30859.66 BRR500-087 US 160 PAGOSA SPRINGS 07/12/07 1.00 5000.00 12904.00 6808.00 SHE 0702-267 NEAR VAIL IN EAGLE COUNTY 08/02/07 1.00 7800.00 6600.00 8000.00 NH 5502-055 COALBANK PASS 08/09/07 1.00 4000.00 8620.00 13800.00 BR 0253-192 I-25&128TH 08/16/07 1.00 10000.00 5967.98 5000.00 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 1.00 7000.00 6625.00 7000.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 1.00 15000.00 39945.75 21458.00 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 1.00 3000.00 14008.40 6200.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 1.00 75000.00 7820.13 11100.00 C R600 - 300 VARIOUS LOCATIONS IN REGION 6 09/27/07 1.00 5000.00 8228.80 570.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 15680.00 12393.26 11079.57 STA 340A-013 SH 340 IN FRUITA 10/25/07 1.00 7500.00 11325.00 5500.00 C 0504-055 PUEBLO COUNTY, US-50C AT SALT 11/01/07 1.00 3000.00 2566.67 1200.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 1.00 15583.25 11625.00 3000.00 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 1.00 6000.00 6951.95 2297.12 C120A-007 ON SH 120 AT PORTLAND OVER TH 11/29/07 1.00 2000.00 3350.00 5000.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 1.00 5000.00 12615.95 7500.00 CC 0821-084 SH82 ASPEN 12/20/07 1.00 15000.00 20666.67 12000.00 SHE 160A-009 U.S. 160 MP 94.15 - MP 96.63 12/20/07 1.00 2000.00 4606.84 2672.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8.00 7010.41 10147.30 4896.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 51.00 10153.33 8824.95 6855.39 =============== 627-00001 Pvmt Mkg Paint Gallon ================================================= STA 0961-012 SH 96, OVERLAY IN PUEBLO 01/04/07 240.00 57.00 70.00 70.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 427 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-00001 Pvmt Mkg Paint Gallon ================================================= STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 2,478.00 30.00 27.00 30.00 IM 0702-269 I 70 IN EAGLE COUNTY 01/11/07 674.00 60.00 45.50 46.00 IM 0702-270 I 70 THROUGH GLENWOOD CANYON 01/11/07 360.00 50.00 35.83 44.00 STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 734.00 35.00 44.45 43.00 STA 012A-042 SH 12, S. OF LA VETA 01/18/07 1,096.00 35.00 38.83 32.00 STA 069A-021 SH 69, W. OF WALSENBURG 01/25/07 1,070.00 35.00 24.55 22.00 NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 169.00 50.00 45.13 43.00 STA 1251-005 SH 125 AND 127 NORTH OF COWDR 02/08/07 2,148.00 50.00 34.07 35.00 NH 0402-070 US 40 ROUTT COUNTY 02/08/07 720.00 50.00 36.00 22.00 HB 149A-023 SOUTH FORK TO CREEDE - SHOULD 02/08/07 2.00 100.00 286.67 150.00 NH 1602-102 WITHIN THE ALAMOSA CITY LIMIT 02/15/07 15.00 150.00 146.50 213.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9,706.00 41.44 34.55 33.99 STA0712-015 SH 71: NEBRASKA STATE LINE SO 05/10/07 984.00 33.00 32.50 30.00 STA0631-009 SH 63 IN WASHINGTON COUNTY 05/10/07 630.00 33.00 32.50 35.00 STA0343-029 ON US 34 EAST OF YUMA IN YUMA 05/10/07 358.00 35.00 32.50 35.00 STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 1,646.00 35.00 27.54 29.00 NH0341-071 US 34: GARFIELD TO MORNING DR 06/14/07 150.00 35.00 87.67 88.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 467.00 30.00 30.12 25.00 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 40.00 40.00 65.69 42.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4,275.00 33.75 31.33 32.38 BRR500-087 US 160 PAGOSA SPRINGS 07/12/07 6.00 200.00 53.50 42.00 C065A-020 SH65 GRAND MESA SLIDE REPAIR 07/26/07 22.00 50.00 108.33 180.00 NH 5502-055 COALBANK PASS 08/09/07 40.00 100.00 50.00 50.00 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 4.00 210.00 272.78 240.00 C0701-190 26.5 ROAD/I-70 BRIDGE REPAIR 08/27/07 2.00 350.00 241.67 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 74.00 105.95 89.68 106.38 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 100.00 45.00 71.74 34.00 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 60.00 70.00 61.75 50.00 SHE0092-019 SH 9 NORTH OF SILVERTHORNE, I 10/18/07 10.00 158.50 156.50 131.25 STA 340A-013 SH 340 IN FRUITA 10/25/07 115.00 65.00 52.54 85.00 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 40.00 50.00 44.48 40.37 CC 0821-084 SH82 ASPEN 12/20/07 241.00 45.00 40.21 27.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 566.00 54.07 54.90 45.46 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14,621.00 40.01 35.00 34.33 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 428 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-00002 Thermoplastic Pvmt Mkg Sq Foot ================================================ NH 030A-025 SH30 (HAVANA)- PARKER TO FLOR 04/19/07 610.00 20.00 8.19 7.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 610.00 20.00 8.19 7.85 C R600 - 300 VARIOUS LOCATIONS IN REGION 6 09/27/07 884.00 8.00 3.14 3.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 884.00 8.00 3.14 3.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,494.00 12.90 5.43 5.07 =============== 627-00003 Thermoplastic Pvmt Mkg (Inlaid) Sq Foot ================================================ STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 144.00 30.00 33.93 27.50 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 264.00 13.00 18.10 18.90 HB 065A-019 SH 65 THRU CEDAREDGE 03/08/07 908.00 14.00 18.65 15.00 SHE 0504-050 INTERSECTION OF SH 50B AND SH 03/22/07 50.00 20.00 21.20 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,366.00 15.71 20.00 17.29 SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 742.00 15.00 19.50 19.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 742.00 15.00 19.50 19.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,108.00 15.46 19.97 18.07 =============== 627-00005 Epoxy Pvmt Mkg Gallon ================================================= HB 0063-021 US 6: RIFLE TO NEW CASTLE 01/04/07 906.00 80.00 78.83 85.00 STA 0961-012 SH 96, OVERLAY IN PUEBLO 01/04/07 240.00 80.00 85.40 145.00 NH 0501-054 US 50 IN GUNNISON COUNTY 01/04/07 860.00 80.00 63.67 60.00 STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 1,239.00 70.00 65.53 70.00 IM 0702-269 I 70 IN EAGLE COUNTY 01/11/07 646.00 80.00 87.00 99.00 IM 0702-270 I 70 THROUGH GLENWOOD CANYON 01/11/07 322.00 110.00 167.92 110.00 STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 728.00 80.00 68.91 70.00 NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 252.00 65.00 105.86 112.00 BR 109A-018 SH 109 LA JUNTA, SH50, MANZI 01/11/07 65.00 100.00 249.88 378.75 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 429 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-00005 Epoxy Pvmt Mkg Gallon ================================================= STA 012A-042 SH 12, S. OF LA VETA 01/18/07 1,096.00 80.00 76.33 74.00 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 348.00 70.00 88.60 70.00 STA 069A-021 SH 69, W. OF WALSENBURG 01/25/07 1,070.00 80.00 76.50 82.00 NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 595.00 65.00 81.55 70.00 SHE 0931-027 SH 93 @ SH 72 01/25/07 79.00 100.00 128.13 90.00 IM 0253-194 ON I-25 IN WELD COUNTY 01/25/07 266.00 60.00 80.33 76.00 NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 196.00 60.00 138.75 138.75 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 356.00 85.00 92.46 74.00 STA 086A-045 SH 86 - FRANKTOWN TO ELBERT C 02/01/07 412.00 110.00 76.78 70.10 STA 1251-005 SH 125 AND 127 NORTH OF COWDR 02/08/07 1,075.00 100.00 83.37 75.00 NH 0402-070 US 40 ROUTT COUNTY 02/08/07 1,364.00 80.00 84.50 94.00 NH 0062-023 SH 6, CLEAR CREEK CANYON 02/08/07 715.00 80.00 79.00 75.25 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 280.00 65.00 81.29 72.25 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 29.00 160.00 239.92 216.00 IM0252-388 I-25 LARKSPUR INTERCHANGE NOR 03/08/07 300.00 75.00 70.83 71.20 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 29.25 120.00 185.38 149.00 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 108.00 100.00 138.36 130.00 SHE 1151-018 SH 115 - GUMAER AVENUE EAST 03/08/07 21.00 150.00 327.38 369.50 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 1,943.00 80.00 62.11 65.00 HB 065A-019 SH 65 THRU CEDAREDGE 03/08/07 679.00 80.00 72.92 75.00 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 388.00 100.00 96.67 65.00 STA0091-030 SH 9 BETWEEN FAIRPLAY AND ALM 03/22/07 400.00 75.00 84.32 75.25 IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 291.00 65.00 77.00 88.60 SHE 0504-050 INTERSECTION OF SH 50B AND SH 03/22/07 45.00 150.00 136.69 131.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 17,343.25 80.94 79.51 80.65 SHE 165A-011 ALONG SH 165 N/O RYE 04/05/07 375.00 70.00 69.75 70.20 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 69.00 126.97 96.05 74.00 NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 582.00 80.00 76.00 70.00 NH 030A-025 SH30 (HAVANA)- PARKER TO FLOR 04/19/07 149.00 100.00 137.85 132.00 NH 0405-025 KIT CARSON BRIDGE 04/26/07 80.00 96.03 122.81 120.00 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 167.00 70.00 73.00 57.00 SHE 0251-175 ALONG I 25 NORTH OF THE CITY 04/26/07 20.00 200.00 201.57 171.00 STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 800.00 65.03 69.89 80.45 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 121.00 75.00 108.13 75.50 STA0712-015 SH 71: NEBRASKA STATE LINE SO 05/10/07 984.00 60.00 72.00 70.00 STA0631-009 SH 63 IN WASHINGTON COUNTY 05/10/07 630.00 60.00 72.00 74.00 STA0343-029 ON US 34 EAST OF YUMA IN YUMA 05/10/07 358.00 60.00 72.00 74.00 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 12.00 320.00 227.12 169.50 STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 540.00 71.66 65.35 57.95 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 514.00 95.00 61.32 59.28 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 44.00 150.00 129.29 124.00 NH 3851-016 US 385 NORTH OF BURLINGTON 05/24/07 233.00 90.57 68.17 59.50 IM 0253-196 I-25: 48TH AVE TO US 36 225: 05/31/07 409.00 75.00 81.81 77.25 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 430 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-00005 Epoxy Pvmt Mkg Gallon ================================================= STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 470.00 70.00 84.23 92.00 BR 059A-032 ON SH 59 IN SEDGWICK COUNTY 06/07/07 4.00 250.00 286.08 225.00 IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 35.00 135.00 237.50 400.00 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 5.00 82.00 379.63 440.00 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 90.00 80.00 90.67 92.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 848.00 95.00 64.18 58.00 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 420.00 70.35 64.93 92.44 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 36.00 120.00 146.00 133.00 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 10.00 200.00 169.83 160.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8,005.00 76.41 77.66 75.90 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 273.00 75.00 89.41 73.50 SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 1.60 350.00 254.00 254.00 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 117.00 80.00 97.24 85.00 BR 0253-192 I-25&128TH 08/16/07 29.00 125.00 258.57 285.00 CR100-126 WEST OF KIT CARSON 08/16/07 297.00 78.81 73.04 68.50 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 29.00 300.00 171.63 151.50 IM 0703-331 WB I-70 AT M.P. 259.70 AND M. 09/06/07 12.00 135.00 436.47 445.87 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 10.00 85.00 148.83 177.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 29.00 130.00 165.88 150.00 C R600 - 300 VARIOUS LOCATIONS IN REGION 6 09/27/07 19.00 160.00 132.72 131.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 816.60 92.34 100.70 94.76 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 52.00 90.00 130.75 110.00 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 20.00 150.00 236.00 200.00 SHE0092-019 SH 9 NORTH OF SILVERTHORNE, I 10/18/07 20.00 170.50 282.50 236.25 STA 340A-013 SH 340 IN FRUITA 10/25/07 73.00 100.00 166.41 200.00 C 0504-055 PUEBLO COUNTY, US-50C AT SALT 11/01/07 16.00 180.00 210.00 250.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 251.00 93.25 77.95 77.00 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 37.00 100.00 106.02 95.88 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 25.00 90.00 154.05 220.00 SHE 082A-010 SH 82 AND BUFFALO VALLEY ROAD 11/29/07 26.00 100.00 135.75 132.00 C120A-007 ON SH 120 AT PORTLAND OVER TH 11/29/07 25.00 850.00 128.03 105.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 53.00 150.00 107.56 95.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 598.00 137.84 111.34 121.26 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26,762.85 81.21 80.92 80.57 =============== 627-00011 Pvmt Mkg Paint (Waterborne) Gallon ================================================= HB 0063-021 US 6: RIFLE TO NEW CASTLE 01/04/07 1,809.00 45.00 22.83 17.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 431 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-00011 Pvmt Mkg Paint (Waterborne) Gallon ================================================= NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 850.00 40.00 39.85 28.00 IM 0253-194 ON I-25 IN WELD COUNTY 01/25/07 532.00 40.00 62.33 27.00 NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 784.00 40.00 27.75 27.75 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 1,068.00 40.00 30.12 40.00 STA402A-007 SH 402 & I-25 OFFRAMS AND E. 03/22/07 7.00 120.00 56.75 53.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,050.00 41.90 30.64 26.67 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 499.00 30.00 35.67 30.00 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 6.00 60.00 76.26 61.05 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 61.00 70.00 44.00 33.00 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 126.00 50.00 93.67 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 692.00 37.43 47.50 43.28 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 546.00 35.00 35.46 36.75 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 151.00 65.00 59.90 50.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 231.00 20.00 35.00 26.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 928.00 36.15 38.44 36.23 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 50.00 45.00 77.72 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 50.00 45.00 77.72 100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,720.00 40.67 33.49 30.24 =============== 627-00012 Pvmt Mkg Paint (Low VOC Solvent Base) Gallon ================================================= NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 1,204.00 40.00 12.33 11.00 STA 086A-045 SH 86 - FRANKTOWN TO ELBERT C 02/01/07 1,400.00 55.00 37.57 27.85 NH 0062-023 SH 6, CLEAR CREEK CANYON 02/08/07 1,040.00 25.00 30.18 29.50 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 1,220.00 40.00 24.76 25.80 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 49.00 35.00 257.58 189.00 IM0252-388 I-25 LARKSPUR INTERCHANGE NOR 03/08/07 960.00 45.00 38.72 38.35 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 8.00 60.00 95.13 52.00 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 944.00 50.00 36.67 27.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 432 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-00012 Pvmt Mkg Paint (Low VOC Solvent Base) Gallon ================================================= STA0091-030 SH 9 BETWEEN FAIRPLAY AND ALM 03/22/07 1,050.00 40.00 34.06 46.60 IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 1,476.00 40.00 24.49 18.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9,351.00 42.09 28.88 28.12 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 125.00 100.53 34.33 27.00 NH 030A-025 SH30 (HAVANA)- PARKER TO FLOR 04/19/07 298.00 45.00 34.14 31.50 NH 0405-025 KIT CARSON BRIDGE 04/26/07 40.00 44.71 80.35 90.00 STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 100.00 101.23 48.02 53.10 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 45.00 30.00 132.56 39.00 STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 1,620.00 30.90 32.53 25.90 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 4,500.00 35.00 32.78 31.62 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 176.00 40.00 41.60 51.00 NH 3851-016 US 385 NORTH OF BURLINGTON 05/24/07 699.00 31.46 42.00 31.00 IM 0253-196 I-25: 48TH AVE TO US 36 225: 05/31/07 819.00 35.00 35.78 33.60 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 10.00 38.00 248.63 350.00 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 1,605.00 31.32 32.93 41.27 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 132.00 40.00 53.00 27.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10,169.00 35.44 35.36 33.35 BR 0253-192 I-25&128TH 08/16/07 30.00 35.00 165.68 185.00 CR100-126 WEST OF KIT CARSON 08/16/07 300.00 40.38 32.03 30.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 100.00 55.00 78.06 50.50 C R600 - 300 VARIOUS LOCATIONS IN REGION 6 09/27/07 38.00 100.00 63.81 63.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 468.00 48.00 54.96 47.00 C 0504-055 PUEBLO COUNTY, US-50C AT SALT 11/01/07 32.00 90.00 111.67 55.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 101.00 43.50 33.24 29.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 230.00 40.00 44.92 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 363.00 45.38 43.59 31.93 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20,351.00 38.96 32.52 31.24 =============== 627-00025 4 In Pvmt Mkg Tape (Rem) Lin Foot =============================================== HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 200.00 10.00 4.85 4.89 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 200.00 10.00 4.85 4.89 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 200.00 10.00 4.85 4.89 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 433 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-00030 Raised Pvmt Marker (Temp) Each =================================================== STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 2,000.00 5.00 1.75 0.60 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 600.00 11.00 8.06 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,600.00 6.38 2.80 1.85 CR100-126 WEST OF KIT CARSON 08/16/07 300.00 6.49 5.34 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 300.00 6.49 5.34 5.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,900.00 6.40 3.00 2.17 =============== 627-01001 Preform Plastic Pvmt Mkg (Ty I) Sq Foot ================================================ NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 5,279.00 9.00 10.08 10.00 SHE 0931-027 SH 93 @ SH 72 01/25/07 17.00 10.00 13.75 13.00 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 2,640.00 9.00 10.91 10.35 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 3,105.00 15.00 11.48 9.45 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 330.00 12.00 12.71 11.20 IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 8,187.00 9.00 10.22 10.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 19,558.00 10.00 10.46 10.38 NH 030A-025 SH30 (HAVANA)- PARKER TO FLOR 04/19/07 2,447.00 11.00 11.30 10.50 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 483.00 10.50 12.42 16.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 308.00 11.00 12.67 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,238.00 10.93 11.57 11.37 BR 0253-192 I-25&128TH 08/16/07 200.00 10.00 12.11 12.50 C R600 - 300 VARIOUS LOCATIONS IN REGION 6 09/27/07 331.00 12.00 11.73 11.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 531.00 11.25 11.87 11.91 C 0504-055 PUEBLO COUNTY, US-50C AT SALT 11/01/07 612.00 13.00 12.67 12.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 434 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-01001 Preform Plastic Pvmt Mkg (Ty I) Sq Foot ================================================ BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 312.00 13.00 10.67 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 924.00 13.00 11.66 11.32 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 24,251.00 10.27 10.67 10.58 =============== 627-01003 Preform Plastic Pvmt Mkg (Ty A) (Inlaid) Sq Foot ================================================ CC 0821-084 SH82 ASPEN 12/20/07 34,753.00 12.00 9.68 8.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 34,753.00 12.00 9.68 8.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 34,753.00 12.00 9.68 8.80 =============== 627-01010 Preform Plastic Pvmt Mkg (TY I)(Inlaid) Sq Foot ================================================ IM 0702-269 I 70 IN EAGLE COUNTY 01/11/07 5,795.00 12.00 13.50 14.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 8,087.00 13.00 13.02 10.80 IM0252-388 I-25 LARKSPUR INTERCHANGE NOR 03/08/07 3,600.00 13.00 10.13 9.85 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 9,160.00 15.00 12.93 10.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 26,642.00 13.47 12.52 11.37 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 5,637.00 12.00 12.00 11.00 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 12,900.00 9.30 10.14 9.62 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 18,537.00 10.12 10.41 10.04 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 372.00 18.00 15.34 14.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 718.00 20.00 26.03 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,090.00 19.32 23.83 12.68 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 46,269.00 12.27 11.77 10.87 =============== 627-02001 Preform Plastic Pvmt Mkg (Ty II) Sq Foot ================================================ NH 030A-025 SH30 (HAVANA)- PARKER TO FLOR 04/19/07 184.00 15.00 11.27 10.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 435 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-02001 Preform Plastic Pvmt Mkg (Ty II) Sq Foot ================================================ IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 14.00 11.50 12.22 11.87 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 198.00 14.75 11.31 10.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 198.00 14.75 11.31 10.60 =============== 627-02010 Preform Plastic Pvmt Mkg (Ty II)(Inlaid) Sq Foot ================================================ IM 0702-270 I 70 THROUGH GLENWOOD CANYON 01/11/07 1,320.00 20.00 20.28 25.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 1,360.00 16.00 13.54 11.61 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,680.00 17.97 16.86 18.21 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 875.00 25.00 11.89 11.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 7,145.00 12.00 12.22 11.87 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8,020.00 13.42 12.16 11.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10,700.00 14.56 13.04 13.39 =============== 627-03001 Preform Plastic Pvmt Mkg (Ty III) Sq Foot ================================================ C R600 - 300 VARIOUS LOCATIONS IN REGION 6 09/27/07 142.00 30.00 12.75 12.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 142.00 30.00 12.75 12.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 142.00 30.00 12.75 12.60 =============== 627-03010 Preform Plastic Pvmt Mkg(Ty III)(Inlaid) Sq Foot ================================================ HB 065A-019 SH 65 THRU CEDAREDGE 03/08/07 255.00 32.00 22.00 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 255.00 32.00 22.00 16.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 255.00 32.00 22.00 16.00 =============== 627-30105 Pvmt Mkg Paint (WS) Sq Foot ================================================ CC 0821-084 SH82 ASPEN 12/20/07 22.00 15.00 23.61 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 22.00 15.00 23.61 22.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 22.00 15.00 23.61 22.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 436 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-30205 Thermoplastic Pvmt Mkg (WS) Sq Foot ================================================ NH0341-071 US 34: GARFIELD TO MORNING DR 06/14/07 4,304.00 10.50 14.50 14.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4,304.00 10.50 14.50 14.50 STA 340A-013 SH 340 IN FRUITA 10/25/07 210.00 20.00 17.26 18.00 SHE 082A-010 SH 82 AND BUFFALO VALLEY ROAD 11/29/07 214.00 15.50 13.30 11.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 424.00 17.73 15.26 14.82 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,728.00 11.15 14.59 14.53 =============== 627-30210 Thermoplastic Pvmt Mkg (XS) Sq Foot ================================================ NH 3851-016 US 385 NORTH OF BURLINGTON 05/24/07 104.00 13.21 12.43 11.30 NH0341-071 US 34: GARFIELD TO MORNING DR 06/14/07 2,870.00 8.50 9.67 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,974.00 8.66 9.76 10.05 STA 340A-013 SH 340 IN FRUITA 10/25/07 380.00 13.00 13.63 14.00 SHE 082A-010 SH 82 AND BUFFALO VALLEY ROAD 11/29/07 418.00 10.00 14.41 14.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 798.00 11.43 14.04 14.03 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,772.00 9.25 10.89 10.89 =============== 627-30324 Preform Plastic Pvmt Mkg (WS) (TY I) Sq Foot ================================================ NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 54.00 20.00 27.00 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 54.00 20.00 27.00 14.00 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 160.00 30.00 22.22 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 160.00 30.00 22.22 20.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 437 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-30324 Preform Plastic Pvmt Mkg (WS) (TY I) Sq Foot ================================================ CC 0821-084 SH82 ASPEN 12/20/07 1,219.00 20.00 17.08 16.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,219.00 20.00 17.08 16.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,433.00 21.12 17.43 16.80 =============== 627-30326 Preform Plastic Pvmt Mkg (WS) (Ty II) Sq Foot ================================================ NH 1602-102 WITHIN THE ALAMOSA CITY LIMIT 02/15/07 107.00 20.00 19.25 19.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 107.00 20.00 19.25 19.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 107.00 20.00 19.25 19.50 =============== 627-30327 Preform Plastic Pvmt Mkg (WS) (Ty III) Sq Foot ================================================ NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 875.00 15.00 13.61 12.75 SHE 0931-027 SH 93 @ SH 72 01/25/07 268.00 15.00 15.97 20.00 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 1,079.00 15.00 14.17 13.40 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 215.00 30.00 16.68 17.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,437.00 16.32 14.41 14.23 NH 030A-025 SH30 (HAVANA)- PARKER TO FLOR 04/19/07 589.00 15.00 15.61 14.75 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 1,320.00 20.00 12.22 11.87 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 2,580.00 16.00 13.35 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4,489.00 17.04 13.47 14.62 C R600 - 300 VARIOUS LOCATIONS IN REGION 6 09/27/07 62.00 25.00 15.98 15.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 62.00 25.00 15.98 15.75 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 161.00 12.00 14.94 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 161.00 12.00 14.94 14.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,149.00 16.75 13.98 14.48 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 438 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-30329 Preform Plastic Pvmt Mkg (XS) (TY I) Sq Foot ================================================ STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 78.00 18.00 21.61 19.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 78.00 18.00 21.61 19.00 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 90.00 18.00 15.00 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 90.00 18.00 15.00 10.00 BRR500-087 US 160 PAGOSA SPRINGS 07/12/07 150.00 12.00 11.50 11.00 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 165.00 25.00 14.67 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 315.00 18.81 13.16 13.62 CC 0821-084 SH82 ASPEN 12/20/07 592.00 15.00 12.48 12.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 592.00 15.00 12.48 12.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,075.00 16.59 13.54 12.87 =============== 627-30331 Preform Plastic Pvmt Mkg (XS) (Ty II) Sq Foot ================================================ NH 1602-102 WITHIN THE ALAMOSA CITY LIMIT 02/15/07 1,220.00 10.00 13.10 13.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,220.00 10.00 13.10 13.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,220.00 10.00 13.10 13.20 =============== 627-30332 Preform Plastic Pvmt Mkg (XS) (Ty III) Sq Foot ================================================ SHE 0931-027 SH 93 @ SH 72 01/25/07 480.00 12.00 10.97 14.50 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 4,590.00 11.00 9.50 9.30 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 1,344.00 20.00 11.70 11.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6,414.00 12.96 10.10 10.08 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 439 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-30332 Preform Plastic Pvmt Mkg (XS) (Ty III) Sq Foot ================================================ IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 1,680.00 13.00 10.09 9.87 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 80.00 10.00 19.35 18.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 171.00 14.00 14.58 9.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,931.00 12.96 10.79 10.20 BR 0253-192 I-25&128TH 08/16/07 112.00 10.50 12.76 12.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 112.00 10.50 12.76 12.50 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 1,620.00 11.00 11.53 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,620.00 11.00 11.53 11.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10,077.00 12.62 10.42 10.28 =============== 627-30405 Preform Thermoplastic Pvmt Mkg (WS) Sq Foot ================================================ HB 0063-021 US 6: RIFLE TO NEW CASTLE 01/04/07 262.50 13.00 22.98 23.40 STA 0961-012 SH 96, OVERLAY IN PUEBLO 01/04/07 378.00 16.00 18.97 28.85 STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 66.00 20.00 18.08 16.00 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 982.00 13.00 17.12 17.00 NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 4,829.00 11.00 13.88 14.00 NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 53.50 19.00 27.75 27.75 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 161.00 15.00 14.71 14.00 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 366.00 16.00 20.19 20.00 SHE 1151-018 SH 115 - GUMAER AVENUE EAST 03/08/07 41.00 20.00 24.67 23.00 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 796.00 16.00 14.36 14.00 SHE 0504-050 INTERSECTION OF SH 50B AND SH 03/22/07 62.00 20.00 17.74 15.75 STA402A-007 SH 402 & I-25 OFFRAMS AND E. 03/22/07 262.00 16.00 15.65 14.84 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8,259.00 12.71 16.04 15.79 NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 265.00 20.00 16.75 15.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 440 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-30405 Preform Thermoplastic Pvmt Mkg (WS) Sq Foot ================================================ NH 0405-025 KIT CARSON BRIDGE 04/26/07 115.00 14.20 18.99 20.00 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 408.00 13.00 17.06 17.75 NH 3851-016 US 385 NORTH OF BURLINGTON 05/24/07 69.00 18.27 16.80 15.40 STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 77.50 20.00 15.57 15.00 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 214.00 14.50 15.67 16.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 25.00 20.00 15.75 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,173.50 15.89 16.79 16.67 SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 46.50 25.00 18.00 18.00 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 248.00 12.00 14.94 13.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 261.00 20.00 44.78 16.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 220.00 10.00 15.13 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 775.50 14.90 24.74 14.31 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 107.00 18.00 15.43 9.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 708.00 20.25 15.18 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 815.00 19.95 15.22 15.08 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,023.00 13.74 16.57 15.73 =============== 627-30410 Preform Thermoplastic Pvmt Mkg (XS) Sq Foot ================================================ HB 0063-021 US 6: RIFLE TO NEW CASTLE 01/04/07 800.00 12.00 16.52 16.40 STA 0961-012 SH 96, OVERLAY IN PUEBLO 01/04/07 3,960.00 12.00 11.80 14.00 STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 1,032.00 12.00 12.63 12.00 NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 11,580.00 11.00 9.45 9.30 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 1,010.00 10.00 13.15 12.00 NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 5,850.00 9.00 9.72 9.70 NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 20.00 18.00 22.25 22.25 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 216.00 13.00 11.20 10.00 IM0252-388 I-25 LARKSPUR INTERCHANGE NOR 03/08/07 204.00 9.00 13.35 13.15 SHE 1151-018 SH 115 - GUMAER AVENUE EAST 03/08/07 260.00 15.00 22.70 19.00 STA402A-007 SH 402 & I-25 OFFRAMS AND E. 03/22/07 314.00 11.00 11.51 10.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 25,246.00 10.77 10.63 10.74 NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 7,006.00 11.00 10.38 10.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 441 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-30410 Preform Thermoplastic Pvmt Mkg (XS) Sq Foot ================================================ SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 492.00 13.00 12.01 12.05 CR400-216 SIGNALS @ US34 & SH37, KERSEY 05/24/07 236.00 11.00 14.00 13.00 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 80.00 18.00 11.33 12.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 200.00 15.00 10.81 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8,014.00 11.29 10.55 10.21 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 24.00 20.00 18.93 15.75 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 294.00 11.00 14.94 13.00 CR100-126 WEST OF KIT CARSON 08/16/07 112.00 10.04 13.80 13.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 490.00 8.00 13.50 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 920.00 9.52 14.31 12.54 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 166.00 14.00 11.38 8.50 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 865.00 10.75 10.97 11.00 C120A-007 ON SH 120 AT PORTLAND OVER TH 11/29/07 48.00 9.00 17.04 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,079.00 11.17 11.18 10.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 35,259.00 10.87 10.73 10.66 =============== 629-01001 Survey Monument (Ty 1) Each =================================================== STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 2.00 500.00 320.38 175.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 500.00 320.38 175.00 NH 3851-016 US 385 NORTH OF BURLINGTON 05/24/07 24.00 355.73 278.33 235.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 22.00 300.00 153.33 157.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 46.00 329.08 218.55 197.70 SHE 0702-267 NEAR VAIL IN EAGLE COUNTY 08/02/07 131.00 328.00 194.04 76.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 131.00 328.00 194.04 76.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 179.00 330.20 200.72 108.38 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 442 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 629-01002 Survey Monument (Ty 2) Each =================================================== IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 8.00 420.00 875.00 325.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 420.00 875.00 325.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 1.00 350.00 175.00 157.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 350.00 175.00 157.00 SHE 0702-267 NEAR VAIL IN EAGLE COUNTY 08/02/07 33.00 398.00 265.33 424.00 CR100-126 WEST OF KIT CARSON 08/16/07 7.00 439.29 210.75 300.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 2.00 400.00 678.13 450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 42.00 404.98 274.16 404.57 STA 340A-013 SH 340 IN FRUITA 10/25/07 3.00 300.00 348.75 280.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 2.00 259.00 550.00 425.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 283.60 463.75 338.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 56.00 395.30 350.06 382.84 =============== 629-01003 Survey Monument (Ty 3) Each =================================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 1.00 700.00 615.38 401.53 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 700.00 615.38 401.53 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 700.00 615.38 401.53 =============== 629-01005 Survey Monument (Ty 5) Each =================================================== NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 12.00 200.00 116.83 87.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12.00 200.00 116.83 87.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 443 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 629-01005 Survey Monument (Ty 5) Each =================================================== STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 3.00 400.00 239.00 157.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 400.00 239.00 157.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15.00 240.00 130.41 101.00 =============== 629-01011 Survey Monument (Ty 1A) Each =================================================== NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 26.00 500.00 575.50 702.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 26.00 500.00 575.50 702.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26.00 500.00 575.50 702.00 =============== 629-01031 Survey Monument (Ty 3A) Each =================================================== NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 3.00 600.00 886.13 666.00 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 1.00 500.00 649.00 1050.00 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 1.00 400.00 590.06 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 540.00 777.52 809.60 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 1.00 1000.00 908.20 582.80 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 6.00 550.00 780.48 501.91 NH 3851-016 US 385 NORTH OF BURLINGTON 05/24/07 8.00 390.87 681.67 695.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 1.00 600.00 703.33 790.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16.00 501.69 742.44 621.52 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 3.00 350.00 981.70 787.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 350.00 981.70 787.50 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 1.00 650.00 807.18 730.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 444 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 629-01031 Survey Monument (Ty 3A) Each =================================================== STA 340A-013 SH 340 IN FRUITA 10/25/07 1.00 675.00 451.25 280.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 1.00 887.00 830.63 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 737.33 753.43 403.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 27.00 518.11 795.83 650.55 =============== 629-01050 Monument Box Each =================================================== NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 1.00 300.00 330.38 265.00 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 5.00 200.00 445.92 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 216.67 426.66 377.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 216.67 426.66 377.50 =============== 629-01065 Survey Monument (Ty 5S) Each =================================================== STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 6.00 800.00 411.67 160.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 800.00 411.67 160.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 800.00 411.67 160.00 =============== 629-01110 Locate Monuments Hour =================================================== NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 8.00 200.00 137.88 136.00 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 8.00 200.00 140.07 130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16.00 200.00 139.06 133.00 NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 40.00 150.00 191.00 184.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 40.00 150.00 191.00 184.00 SHE 0702-267 NEAR VAIL IN EAGLE COUNTY 08/02/07 403.00 165.00 151.35 170.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 403.00 165.00 151.35 170.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 459.00 164.91 153.57 169.93 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 445 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 629-01210 Adjust Monument Box Each =================================================== STA 0961-012 SH 96, OVERLAY IN PUEBLO 01/04/07 16.00 320.00 786.50 320.00 STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 2.00 320.00 468.83 570.00 NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 8.00 300.00 338.37 350.00 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 1.00 270.00 399.25 330.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 27.00 312.22 648.05 347.78 NH 030A-025 SH30 (HAVANA)- PARKER TO FLOR 04/19/07 5.00 100.00 318.58 285.00 STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 3.00 500.00 454.17 500.00 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 1.00 350.00 353.33 160.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 9.00 261.11 368.48 342.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 36.00 299.44 565.63 346.53 =============== 630-00000 Flagging Hour =================================================== HB 0063-021 US 6: RIFLE TO NEW CASTLE 01/04/07 3,000.00 25.00 27.63 32.80 STA 0961-012 SH 96, OVERLAY IN PUEBLO 01/04/07 650.00 23.00 20.75 20.75 NH 0501-054 US 50 IN GUNNISON COUNTY 01/04/07 500.00 30.00 20.50 12.00 STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 3,000.00 23.00 23.26 21.50 IM 0702-269 I 70 IN EAGLE COUNTY 01/11/07 2,000.00 25.00 31.00 30.00 IM 0702-270 I 70 THROUGH GLENWOOD CANYON 01/11/07 500.00 25.00 25.03 29.00 STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 3,000.00 22.00 21.03 21.25 NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 2,100.00 22.00 20.88 22.00 BR 109A-018 SH 109 LA JUNTA, SH50, MANZI 01/11/07 1,000.00 21.00 22.13 18.25 STA 012A-042 SH 12, S. OF LA VETA 01/18/07 2,400.00 21.00 22.69 20.15 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 6,000.00 22.00 22.87 23.00 STA 069A-021 SH 69, W. OF WALSENBURG 01/25/07 2,080.00 21.00 21.29 21.00 NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 7,200.00 22.00 22.13 22.00 SHE 0931-027 SH 93 @ SH 72 01/25/07 640.00 22.00 23.15 26.00 IM 0253-194 ON I-25 IN WELD COUNTY 01/25/07 1,000.00 22.00 25.00 22.00 NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 6,000.00 22.00 19.00 19.00 STA 0661-009 ON SH 66 IN WELD COUNTY 02/01/07 500.00 24.00 25.85 29.00 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 1,600.00 22.00 21.61 26.00 STA 086A-045 SH 86 - FRANKTOWN TO ELBERT C 02/01/07 3,600.00 24.00 21.79 23.35 STA 1251-005 SH 125 AND 127 NORTH OF COWDR 02/08/07 3,000.00 28.00 26.13 25.00 NH 0402-070 US 40 ROUTT COUNTY 02/08/07 2,800.00 25.00 22.50 27.00 NH 0062-023 SH 6, CLEAR CREEK CANYON 02/08/07 700.00 23.00 24.67 24.25 HB 149A-023 SOUTH FORK TO CREEDE - SHOULD 02/08/07 864.00 25.00 22.67 21.00 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 2,100.00 22.00 20.49 20.60 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 446 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00000 Flagging Hour =================================================== NH 1602-102 WITHIN THE ALAMOSA CITY LIMIT 02/15/07 1,500.00 23.00 22.55 23.10 SHE 1151-020 SH 115 VMS, MP 17 AND MP 41 02/15/07 100.00 22.00 23.42 20.29 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 6,350.00 22.00 23.66 22.14 SHE 5502-054 02/22/07 320.00 26.00 26.93 13.00 IM0252-388 I-25 LARKSPUR INTERCHANGE NOR 03/08/07 500.00 24.00 24.40 19.75 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 480.00 22.00 23.00 24.00 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 450.00 22.00 20.62 20.00 SHE 1151-018 SH 115 - GUMAER AVENUE EAST 03/08/07 400.00 22.00 23.57 22.50 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 6,000.00 21.00 23.52 23.00 HB 065A-019 SH 65 THRU CEDAREDGE 03/08/07 2,500.00 28.00 22.38 25.00 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 4,500.00 22.00 24.53 21.60 STA0091-030 SH 9 BETWEEN FAIRPLAY AND ALM 03/22/07 2,808.00 22.00 20.59 16.30 IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 200.00 21.00 21.54 18.80 SHE 0504-050 INTERSECTION OF SH 50B AND SH 03/22/07 320.00 22.00 20.65 20.78 STA402A-007 SH 402 & I-25 OFFRAMS AND E. 03/22/07 50.00 24.00 22.73 21.73 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 82,712.00 22.84 22.98 22.62 SHE 165A-011 ALONG SH 165 N/O RYE 04/05/07 540.00 22.00 20.49 20.00 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 1,500.00 19.25 22.87 20.00 NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 5,500.00 28.00 22.13 21.50 NH 030A-025 SH30 (HAVANA)- PARKER TO FLOR 04/19/07 1,300.00 23.00 20.07 19.90 NH 0405-025 KIT CARSON BRIDGE 04/26/07 2,000.00 22.61 24.86 25.00 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 3,700.00 25.00 22.47 21.00 SHE 0251-175 ALONG I 25 NORTH OF THE CITY 04/26/07 120.00 25.00 23.74 19.45 STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 3,888.00 20.48 23.32 23.60 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 500.00 22.00 26.69 27.75 STA0712-015 SH 71: NEBRASKA STATE LINE SO 05/10/07 300.00 22.00 23.50 25.00 STA0631-009 SH 63 IN WASHINGTON COUNTY 05/10/07 300.00 22.00 21.00 22.00 STA0343-029 ON US 34 EAST OF YUMA IN YUMA 05/10/07 150.00 22.00 23.50 22.00 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 1,000.00 24.00 25.48 24.50 STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 2,800.00 23.21 21.08 18.65 IM0703-317 FROM MP 221.30 TO MP 251.30 J 05/17/07 2,440.00 22.33 19.88 18.00 STA 0703-312 I-70 HIDDEN VALLEY AND FALL R 05/17/07 40.00 22.68 26.00 26.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 21,000.00 22.00 18.90 16.11 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 1,000.00 22.00 21.77 18.50 NH 3851-016 US 385 NORTH OF BURLINGTON 05/24/07 1,500.00 23.73 24.33 25.00 SHE 133A-032 SH 133 BETWEEN REDSTONE AND M 05/24/07 1,200.00 25.00 23.63 23.85 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 1,500.00 23.00 23.50 20.00 CR400-216 SIGNALS @ US34 & SH37, KERSEY 05/24/07 200.00 22.00 22.25 19.50 IM 0253-196 I-25: 48TH AVE TO US 36 225: 05/31/07 2,700.00 25.00 29.48 25.00 STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 4,500.00 22.00 23.73 22.00 BR 059A-032 ON SH 59 IN SEDGWICK COUNTY 06/07/07 200.00 22.00 24.93 21.00 IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 500.00 23.50 23.50 25.00 NH0341-071 US 34: GARFIELD TO MORNING DR 06/14/07 12,000.00 20.00 20.50 22.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 447 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00000 Flagging Hour =================================================== SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 700.00 22.00 25.94 30.00 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 1,000.00 22.00 22.67 25.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 4,000.00 25.50 22.32 22.00 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 4,500.00 21.69 23.04 22.84 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 900.00 22.00 23.35 22.00 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 1,000.00 25.00 26.55 21.64 ITSSW00-378 VMS REPLACEMENT IN REGIONS 1, 06/21/07 600.00 25.00 29.68 30.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 85,078.00 22.62 21.97 20.69 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 7,264.00 25.00 24.15 20.78 BRR500-087 US 160 PAGOSA SPRINGS 07/12/07 1,700.00 25.00 19.50 17.00 SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 40.00 22.00 24.00 24.00 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 120.00 22.00 23.57 22.50 C065A-020 SH65 GRAND MESA SLIDE REPAIR 07/26/07 700.00 28.00 23.33 24.00 SHE 0702-267 NEAR VAIL IN EAGLE COUNTY 08/02/07 246.00 21.50 27.78 25.00 NH 5502-055 COALBANK PASS 08/09/07 1,200.00 30.00 28.50 35.00 ITS SW00-457 DRCOG REGION 08/09/07 200.00 25.00 21.00 21.00 C0702-273 I-70 GLENWOOD CANYON 08/09/07 500.00 32.00 30.00 30.00 BR 0253-192 I-25&128TH 08/16/07 1,000.00 22.00 20.64 22.00 CR100-126 WEST OF KIT CARSON 08/16/07 7,180.00 22.08 24.91 21.00 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 2,000.00 24.00 12.72 1.00 C0701-190 26.5 ROAD/I-70 BRIDGE REPAIR 08/27/07 700.00 22.00 20.67 22.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 3,000.00 23.00 18.30 18.00 IM0703-323 GEORGETOWN HILL CHUTE 2 AND 3 08/30/07 1,600.00 24.18 29.52 21.47 ITSSW00-455 VMS REPLACEMENT IN REGIONS 1, 08/30/07 800.00 30.00 29.25 31.00 C0701-187 I-70 20 ROAD BRIDGE REPAIR 09/06/07 300.00 30.00 24.45 26.50 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 2,000.00 21.00 21.88 19.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 6,000.00 25.00 24.63 23.00 C R600 - 300 VARIOUS LOCATIONS IN REGION 6 09/27/07 250.00 25.00 26.53 21.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 36,800.00 24.25 23.67 20.66 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 1,500.00 22.00 23.80 22.00 BR R300-130 I-70 (VARIOUS LOCATIONS) 10/18/07 1,200.00 22.00 30.67 25.00 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 1,100.00 22.00 21.50 21.00 SHE0092-019 SH 9 NORTH OF SILVERTHORNE, I 10/18/07 160.00 25.50 25.93 23.10 STA 340A-013 SH 340 IN FRUITA 10/25/07 6,000.00 23.00 24.50 22.00 C 0504-055 PUEBLO COUNTY, US-50C AT SALT 11/01/07 328.00 25.00 20.33 22.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 7,500.00 22.00 24.69 26.00 BR 0241-047 US 24, 2 MI S OF GRANITE, CHA 11/15/07 100.00 25.00 42.44 38.90 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 5,000.00 22.00 22.59 19.68 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 448 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00000 Flagging Hour =================================================== BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 500.00 22.00 23.67 22.00 SHE 082A-010 SH 82 AND BUFFALO VALLEY ROAD 11/29/07 200.00 30.00 30.80 28.08 C120A-007 ON SH 120 AT PORTLAND OVER TH 11/29/07 80.00 22.00 18.00 17.00 C0703-338 CLEAR CREEK COUNTY 12/05/07 60.00 25.00 31.33 32.00 STSR400-229 SH 14, SH 93, & SH 157 IN BOU 12/06/07 200.00 22.00 28.47 29.50 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 600.00 22.00 23.86 21.70 CC 0821-084 SH82 ASPEN 12/20/07 4,000.00 25.00 26.11 20.90 SHE 160A-009 U.S. 160 MP 94.15 - MP 96.63 12/20/07 1,000.00 24.00 27.84 23.98 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 29,528.00 22.80 24.55 22.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 234,118.00 22.98 23.03 21.63 =============== 630-00001 Pilot Car Operation Hour =================================================== NH 0501-054 US 50 IN GUNNISON COUNTY 01/04/07 100.00 40.00 46.67 25.00 NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 500.00 45.00 27.75 27.75 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 180.00 40.00 42.96 52.00 STA 086A-045 SH 86 - FRANKTOWN TO ELBERT C 02/01/07 720.00 40.00 34.55 13.35 STA 1251-005 SH 125 AND 127 NORTH OF COWDR 02/08/07 550.00 38.00 52.67 55.00 NH 0402-070 US 40 ROUTT COUNTY 02/08/07 250.00 42.00 57.50 50.00 HB 065A-019 SH 65 THRU CEDAREDGE 03/08/07 360.00 40.00 41.97 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,660.00 40.71 42.99 34.77 SHE 165A-011 ALONG SH 165 N/O RYE 04/05/07 270.00 35.00 36.16 35.00 NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 360.00 50.00 46.68 49.70 STA0712-015 SH 71: NEBRASKA STATE LINE SO 05/10/07 120.00 40.00 50.00 50.00 STA0631-009 SH 63 IN WASHINGTON COUNTY 05/10/07 120.00 40.00 50.00 50.00 STA0343-029 ON US 34 EAST OF YUMA IN YUMA 05/10/07 60.00 40.00 50.00 50.00 STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 600.00 33.00 41.83 38.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,530.00 38.73 42.69 42.58 CR100-126 WEST OF KIT CARSON 08/16/07 1,920.00 35.71 45.49 33.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,920.00 35.71 45.49 33.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,110.00 38.64 43.66 36.17 =============== 630-00003 Uniformed Traf Ctrl Hour =================================================== STA 0961-012 SH 96, OVERLAY IN PUEBLO 01/04/07 200.00 80.00 54.40 52.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 449 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00003 Uniformed Traf Ctrl Hour =================================================== SHE 0931-027 SH 93 @ SH 72 01/25/07 50.00 80.00 69.58 95.00 IM 0253-194 ON I-25 IN WELD COUNTY 01/25/07 600.00 70.00 28.67 16.00 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 100.00 80.00 75.65 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 950.00 73.68 47.77 33.95 NH 030A-025 SH30 (HAVANA)- PARKER TO FLOR 04/19/07 320.00 80.00 64.91 59.00 SHE0761-193 I-76: SHERIDAN TO I-25 (M.P. 05/17/07 300.00 80.00 72.42 68.80 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 435.00 80.00 57.16 63.50 IM 0253-196 I-25: 48TH AVE TO US 36 225: 05/31/07 2,600.00 80.00 65.25 55.00 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 16.00 75.00 84.52 90.00 CR600-285 VARIOUS LOCATIONS IN REGION 6 06/28/07 40.00 80.00 79.33 85.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,711.00 79.98 64.57 57.93 C R600 - 300 VARIOUS LOCATIONS IN REGION 6 09/27/07 130.00 80.00 69.13 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 130.00 80.00 69.13 80.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,791.00 78.73 61.71 53.77 =============== 630-00004 Traf Ctrl Vehicle Each =================================================== NH 030A-025 SH30 (HAVANA)- PARKER TO FLOR 04/19/07 1.00 3500.00 3783.66 3000.00 SHE0761-193 I-76: SHERIDAN TO I-25 (M.P. 05/17/07 1.00 5000.00 3365.05 2645.25 IM 0253-196 I-25: 48TH AVE TO US 36 225: 05/31/07 2.00 3500.00 20550.00 8000.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 2.00 3500.00 5126.67 3150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 3750.00 9387.49 4657.54 BR 0253-192 I-25&128TH 08/16/07 2.00 3500.00 4704.74 2600.00 C R600 - 300 VARIOUS LOCATIONS IN REGION 6 09/27/07 1.00 8000.00 3204.22 2370.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 5000.00 4204.57 2523.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 4166.67 7443.89 3946.14 =============== 630-00007 Traf Ctrl Inspection Day ==================================================== HB 0063-021 US 6: RIFLE TO NEW CASTLE 01/04/07 50.00 125.00 270.17 328.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 450 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00007 Traf Ctrl Inspection Day ==================================================== STA 0961-012 SH 96, OVERLAY IN PUEBLO 01/04/07 32.00 100.00 62.17 28.85 NH 0501-054 US 50 IN GUNNISON COUNTY 01/04/07 10.00 130.00 156.67 90.00 STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 30.00 120.00 132.26 90.00 IM 0702-269 I 70 IN EAGLE COUNTY 01/11/07 55.00 125.00 256.50 293.00 IM 0702-270 I 70 THROUGH GLENWOOD CANYON 01/11/07 20.00 125.00 172.50 200.00 STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 30.00 120.00 80.96 65.00 NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 25.00 100.00 75.86 54.00 BR 109A-018 SH 109 LA JUNTA, SH50, MANZI 01/11/07 100.00 170.00 166.38 152.75 STA 012A-042 SH 12, S. OF LA VETA 01/18/07 40.00 130.00 63.67 32.00 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 60.00 125.00 163.00 160.00 STA 069A-021 SH 69, W. OF WALSENBURG 01/25/07 40.00 130.00 74.63 83.00 NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 37.00 110.00 81.58 54.00 SHE 0931-027 SH 93 @ SH 72 01/25/07 10.00 100.00 60.20 80.00 IM 0253-194 ON I-25 IN WELD COUNTY 01/25/07 58.00 125.00 88.33 100.00 NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 26.00 120.00 83.25 83.25 STA 0661-009 ON SH 66 IN WELD COUNTY 02/01/07 22.00 120.00 106.12 132.00 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 35.00 100.00 96.00 110.00 STA 086A-045 SH 86 - FRANKTOWN TO ELBERT C 02/01/07 36.00 90.00 89.72 94.60 STA 1251-005 SH 125 AND 127 NORTH OF COWDR 02/08/07 35.00 150.00 178.67 145.00 NH 0402-070 US 40 ROUTT COUNTY 02/08/07 23.00 125.00 202.50 155.00 NH 0062-023 SH 6, CLEAR CREEK CANYON 02/08/07 25.00 100.00 92.08 55.00 HB 149A-023 SOUTH FORK TO CREEDE - SHOULD 02/08/07 14.00 70.00 96.67 100.00 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 30.00 120.00 84.33 77.30 NH 1602-102 WITHIN THE ALAMOSA CITY LIMIT 02/15/07 18.00 120.00 135.00 70.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 85.00 80.00 103.32 97.20 SHE 5502-054 02/22/07 20.00 150.00 71.15 25.00 IM0252-388 I-25 LARKSPUR INTERCHANGE NOR 03/08/07 40.00 125.00 87.28 109.50 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 15.00 100.00 106.96 121.00 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 30.00 100.00 44.84 22.00 SHE 1151-018 SH 115 - GUMAER AVENUE EAST 03/08/07 12.00 110.00 119.14 100.00 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 48.00 100.00 141.00 160.00 HB 065A-019 SH 65 THRU CEDAREDGE 03/08/07 25.00 200.00 123.67 120.00 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 45.00 180.00 174.00 76.00 STA0091-030 SH 9 BETWEEN FAIRPLAY AND ALM 03/22/07 42.00 100.00 97.08 85.40 IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 35.00 100.00 92.89 105.00 SHE 0504-050 INTERSECTION OF SH 50B AND SH 03/22/07 12.00 100.00 61.91 121.45 STA402A-007 SH 402 & I-25 OFFRAMS AND E. 03/22/07 16.00 110.00 75.75 85.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,286.00 121.38 116.28 117.20 SHE 165A-011 ALONG SH 165 N/O RYE 04/05/07 10.00 55.00 65.68 55.00 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 85.00 75.96 93.16 74.00 NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 45.00 150.00 115.75 113.00 NH 030A-025 SH30 (HAVANA)- PARKER TO FLOR 04/19/07 16.00 100.00 88.58 85.00 NH 0405-025 KIT CARSON BRIDGE 04/26/07 60.00 98.46 176.51 270.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 451 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00007 Traf Ctrl Inspection Day ==================================================== STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 38.00 80.00 87.00 82.00 SHE 0251-175 ALONG I 25 NORTH OF THE CITY 04/26/07 18.00 100.00 66.77 10.50 STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 21.00 77.38 130.35 212.00 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 32.00 100.00 80.20 98.80 STA0712-015 SH 71: NEBRASKA STATE LINE SO 05/10/07 4.00 100.00 75.00 50.00 STA0631-009 SH 63 IN WASHINGTON COUNTY 05/10/07 4.00 100.00 75.00 100.00 STA0343-029 ON US 34 EAST OF YUMA IN YUMA 05/10/07 2.00 100.00 75.00 100.00 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 150.00 100.00 139.23 123.50 STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 45.00 131.74 91.18 104.00 SHE0761-193 I-76: SHERIDAN TO I-25 (M.P. 05/17/07 30.00 80.00 155.13 211.65 IM0703-317 FROM MP 221.30 TO MP 251.30 J 05/17/07 32.00 89.15 111.67 90.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 265.00 70.00 98.02 85.56 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 140.00 100.00 146.25 144.50 NH 3851-016 US 385 NORTH OF BURLINGTON 05/24/07 20.00 69.56 121.00 103.00 SHE 133A-032 SH 133 BETWEEN REDSTONE AND M 05/24/07 10.00 115.00 102.50 105.00 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 25.00 150.00 152.50 175.00 CR400-216 SIGNALS @ US34 & SH37, KERSEY 05/24/07 12.00 125.00 123.50 107.00 IM 0253-196 I-25: 48TH AVE TO US 36 225: 05/31/07 17.00 100.00 181.25 168.00 STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 25.00 125.00 124.25 110.00 BR 059A-032 ON SH 59 IN SEDGWICK COUNTY 06/07/07 20.00 120.00 233.78 225.00 NH0341-071 US 34: GARFIELD TO MORNING DR 06/14/07 22.00 100.00 120.00 75.00 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 20.00 80.00 101.38 120.00 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 32.00 125.00 170.00 200.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 75.00 150.00 157.96 150.00 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 36.00 98.35 81.21 87.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 55.00 100.00 112.00 92.00 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 50.00 125.00 147.29 171.48 ITSSW00-378 VMS REPLACEMENT IN REGIONS 1, 06/21/07 30.00 150.00 209.22 217.65 CR600-285 VARIOUS LOCATIONS IN REGION 6 06/28/07 25.00 75.00 78.00 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,471.00 99.52 126.54 124.52 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 100.00 125.00 132.33 146.21 BRR500-087 US 160 PAGOSA SPRINGS 07/12/07 20.00 175.00 87.00 74.00 SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 10.00 80.00 35.00 35.00 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 28.00 135.00 99.99 100.00 C065A-020 SH65 GRAND MESA SLIDE REPAIR 07/26/07 18.00 100.00 101.67 85.00 SHE 0702-267 NEAR VAIL IN EAGLE COUNTY 08/02/07 40.00 108.00 154.28 155.00 NH 5502-055 COALBANK PASS 08/09/07 18.00 125.00 101.75 103.50 ITS SW00-457 DRCOG REGION 08/09/07 20.00 150.00 61.25 52.50 C0702-273 I-70 GLENWOOD CANYON 08/09/07 150.00 320.00 150.00 150.00 BR 0253-192 I-25&128TH 08/16/07 145.00 100.00 154.77 92.00 CR100-126 WEST OF KIT CARSON 08/16/07 25.00 94.75 117.27 95.00 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 25.00 100.00 145.56 180.00 C0701-190 26.5 ROAD/I-70 BRIDGE REPAIR 08/27/07 10.00 77.00 84.50 77.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 452 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00007 Traf Ctrl Inspection Day ==================================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 1,003.00 100.00 70.97 77.00 IM0703-323 GEORGETOWN HILL CHUTE 2 AND 3 08/30/07 20.00 105.08 73.14 78.56 ITSSW00-455 VMS REPLACEMENT IN REGIONS 1, 08/30/07 50.00 200.00 197.50 210.00 IM R400-215 I-25 & I-76 VMS INSTALLATION 09/06/07 12.00 225.00 69.73 27.20 C0701-187 I-70 20 ROAD BRIDGE REPAIR 09/06/07 26.00 140.00 59.40 65.00 IM 0703-331 WB I-70 AT M.P. 259.70 AND M. 09/06/07 10.00 100.00 137.05 220.70 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 20.00 150.00 60.83 50.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 104.00 120.00 92.50 87.00 C R600 - 300 VARIOUS LOCATIONS IN REGION 6 09/27/07 20.00 125.00 146.41 107.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,874.00 126.90 95.88 95.57 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 20.00 125.00 78.93 80.00 BR R300-130 I-70 (VARIOUS LOCATIONS) 10/18/07 24.00 120.00 223.33 220.00 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 20.00 110.00 91.25 80.00 SHE0092-019 SH 9 NORTH OF SILVERTHORNE, I 10/18/07 10.00 106.50 106.70 94.50 IM 0703-336 WB I-70 AT M.P. 259.70 AND M. 10/18/07 4.00 89.50 144.44 120.00 STA 340A-013 SH 340 IN FRUITA 10/25/07 120.00 125.00 68.06 68.00 C 0504-055 PUEBLO COUNTY, US-50C AT SALT 11/01/07 15.00 100.00 25.33 25.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 100.00 107.00 46.05 28.00 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 35.00 75.00 88.62 65.60 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 60.00 100.00 83.91 77.00 SHE 082A-010 SH 82 AND BUFFALO VALLEY ROAD 11/29/07 10.00 175.00 88.44 30.00 C120A-007 ON SH 120 AT PORTLAND OVER TH 11/29/07 20.00 120.00 47.50 44.00 STSR400-229 SH 14, SH 93, & SH 157 IN BOU 12/06/07 40.00 100.00 142.80 111.75 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 156.00 100.00 115.89 150.00 CC 0821-084 SH82 ASPEN 12/20/07 185.00 250.00 170.25 82.50 SHE 160A-009 U.S. 160 MP 94.15 - MP 96.63 12/20/07 16.00 125.00 105.87 58.48 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 835.00 139.91 106.52 87.91 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,466.00 120.22 111.17 107.28 =============== 630-00009 Traf Ctrl Vehicle (Truck) Each =================================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 2.00 12000.00 11513.59 2013.36 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 12000.00 11513.59 2013.36 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 12000.00 11513.59 2013.36 =============== 630-00011 Courtesy Vehicle Day ==================================================== IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 40.00 900.00 866.67 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 40.00 900.00 866.67 1200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 900.00 866.67 1200.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 453 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00012 Traf Ctrl Mgmt Day ==================================================== HB 0063-021 US 6: RIFLE TO NEW CASTLE 01/04/07 130.00 550.00 509.21 480.25 STA 0961-012 SH 96, OVERLAY IN PUEBLO 01/04/07 80.00 530.00 415.00 405.00 NH 0501-054 US 50 IN GUNNISON COUNTY 01/04/07 20.00 500.00 470.00 250.00 STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 75.00 550.00 619.60 650.00 IM 0702-269 I 70 IN EAGLE COUNTY 01/11/07 115.00 600.00 850.00 1200.00 IM 0702-270 I 70 THROUGH GLENWOOD CANYON 01/11/07 80.00 550.00 573.33 670.00 STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 68.00 460.00 537.00 600.00 NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 65.00 500.00 433.46 542.00 BR 109A-018 SH 109 LA JUNTA, SH50, MANZI 01/11/07 40.00 440.00 577.88 610.75 STA 012A-042 SH 12, S. OF LA VETA 01/18/07 60.00 450.00 541.33 403.00 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 120.00 450.00 546.00 720.00 STA 069A-021 SH 69, W. OF WALSENBURG 01/25/07 52.00 450.00 414.75 440.00 NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 140.00 400.00 480.33 440.00 SHE 0931-027 SH 93 @ SH 72 01/25/07 40.00 500.00 550.90 776.00 IM 0253-194 ON I-25 IN WELD COUNTY 01/25/07 144.00 425.00 791.67 1100.00 NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 50.00 500.00 555.00 555.00 STA 0661-009 ON SH 66 IN WELD COUNTY 02/01/07 30.00 425.00 492.43 440.00 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 52.00 400.00 474.25 530.00 STA 086A-045 SH 86 - FRANKTOWN TO ELBERT C 02/01/07 90.00 500.00 468.46 367.30 STA 1251-005 SH 125 AND 127 NORTH OF COWDR 02/08/07 88.00 600.00 434.83 285.00 NH 0402-070 US 40 ROUTT COUNTY 02/08/07 58.00 575.00 556.00 612.00 NH 0062-023 SH 6, CLEAR CREEK CANYON 02/08/07 20.00 650.00 632.50 500.00 HB 149A-023 SOUTH FORK TO CREEDE - SHOULD 02/08/07 36.00 450.00 511.67 450.00 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 74.00 550.00 451.43 410.00 NH 1602-102 WITHIN THE ALAMOSA CITY LIMIT 02/15/07 45.00 400.00 600.00 600.00 SHE 1151-020 SH 115 VMS, MP 17 AND MP 41 02/15/07 20.00 430.00 499.86 411.13 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 280.00 500.00 547.67 513.00 SHE 5502-054 02/22/07 40.00 400.00 462.80 110.00 IM0252-388 I-25 LARKSPUR INTERCHANGE NOR 03/08/07 65.00 450.00 469.44 440.00 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 60.00 500.00 532.38 520.00 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 75.00 480.00 376.75 375.00 SHE 1151-018 SH 115 - GUMAER AVENUE EAST 03/08/07 35.00 470.00 457.65 450.00 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 120.00 480.00 603.33 710.00 HB 065A-019 SH 65 THRU CEDAREDGE 03/08/07 50.00 550.00 495.83 500.00 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 75.00 600.00 785.00 440.00 STA0091-030 SH 9 BETWEEN FAIRPLAY AND ALM 03/22/07 64.00 450.00 483.20 410.00 IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 100.00 500.00 647.62 680.00 SHE 0504-050 INTERSECTION OF SH 50B AND SH 03/22/07 30.00 500.00 429.57 327.96 STA402A-007 SH 402 & I-25 OFFRAMS AND E. 03/22/07 40.00 425.00 346.00 329.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,826.00 493.96 525.36 563.06 SHE 165A-011 ALONG SH 165 N/O RYE 04/05/07 30.00 425.00 332.25 150.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 454 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00012 Traf Ctrl Mgmt Day ==================================================== HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 85.00 463.04 553.31 500.00 NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 105.00 550.00 517.50 550.00 NH 030A-025 SH30 (HAVANA)- PARKER TO FLOR 04/19/07 40.00 450.00 505.61 560.00 NH 0405-025 KIT CARSON BRIDGE 04/26/07 140.00 446.47 552.17 260.00 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 93.00 450.00 459.67 435.00 SHE 0251-175 ALONG I 25 NORTH OF THE CITY 04/26/07 45.00 475.00 373.11 367.50 STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 40.00 433.33 601.40 867.00 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 80.00 400.00 627.50 555.00 STA0712-015 SH 71: NEBRASKA STATE LINE SO 05/10/07 10.00 300.00 175.00 100.00 STA0631-009 SH 63 IN WASHINGTON COUNTY 05/10/07 10.00 300.00 150.00 200.00 STA0343-029 ON US 34 EAST OF YUMA IN YUMA 05/10/07 6.00 300.00 150.00 200.00 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 60.00 470.00 556.37 556.50 STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 70.00 502.01 555.50 466.00 SHE0761-193 I-76: SHERIDAN TO I-25 (M.P. 05/17/07 60.00 425.00 406.81 423.25 IM0703-317 FROM MP 221.30 TO MP 251.30 J 05/17/07 65.00 474.51 366.67 350.00 STA 0703-312 I-70 HIDDEN VALLEY AND FALL R 05/17/07 20.00 402.47 575.00 575.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 600.00 500.00 681.96 958.35 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 260.00 500.00 633.55 694.00 NH 3851-016 US 385 NORTH OF BURLINGTON 05/24/07 40.00 414.30 563.33 490.00 SHE 133A-032 SH 133 BETWEEN REDSTONE AND M 05/24/07 50.00 475.00 513.38 514.50 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 50.00 550.00 575.00 500.00 CR400-216 SIGNALS @ US34 & SH37, KERSEY 05/24/07 30.00 425.00 557.50 485.00 IM 0253-196 I-25: 48TH AVE TO US 36 225: 05/31/07 85.00 500.00 844.75 784.00 STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 80.00 450.00 506.67 500.00 BR 059A-032 ON SH 59 IN SEDGWICK COUNTY 06/07/07 45.00 450.00 438.00 350.00 NH0341-071 US 34: GARFIELD TO MORNING DR 06/14/07 102.00 425.00 673.33 450.00 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 60.00 450.00 534.93 530.00 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 50.00 425.00 428.33 460.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 200.00 500.00 645.32 550.00 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 90.00 958.37 1309.21 1413.81 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 140.00 500.00 714.00 460.00 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 100.00 575.00 535.89 387.90 ITSSW00-378 VMS REPLACEMENT IN REGIONS 1, 06/21/07 80.00 700.00 1032.55 847.65 CR600-285 VARIOUS LOCATIONS IN REGION 6 06/28/07 60.00 500.00 495.00 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,081.00 499.56 619.53 626.79 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 200.00 550.00 512.67 372.39 BRR500-087 US 160 PAGOSA SPRINGS 07/12/07 40.00 550.00 557.50 415.00 SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 30.00 400.00 390.00 390.00 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 70.00 500.00 404.42 400.00 C065A-020 SH65 GRAND MESA SLIDE REPAIR 07/26/07 45.00 725.00 606.67 650.00 SHE 0702-267 NEAR VAIL IN EAGLE COUNTY 08/02/07 130.00 495.00 558.09 350.00 NH 5502-055 COALBANK PASS 08/09/07 40.00 500.00 540.00 552.00 ITS SW00-457 DRCOG REGION 08/09/07 80.00 450.00 595.35 590.70 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 455 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00012 Traf Ctrl Mgmt Day ==================================================== C0702-273 I-70 GLENWOOD CANYON 08/09/07 49.00 480.00 550.00 550.00 BR 0253-192 I-25&128TH 08/16/07 64.00 500.00 587.29 475.00 CR100-126 WEST OF KIT CARSON 08/16/07 100.00 503.64 746.06 750.00 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 50.00 400.00 369.45 250.00 C0701-190 26.5 ROAD/I-70 BRIDGE REPAIR 08/27/07 20.00 510.00 540.00 510.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 275.00 450.00 379.44 359.00 IM0703-323 GEORGETOWN HILL CHUTE 2 AND 3 08/30/07 55.00 456.67 559.62 628.46 ITSSW00-455 VMS REPLACEMENT IN REGIONS 1, 08/30/07 100.00 800.00 1002.50 1015.00 IM R400-215 I-25 & I-76 VMS INSTALLATION 09/06/07 30.00 800.00 395.00 326.00 C0701-187 I-70 20 ROAD BRIDGE REPAIR 09/06/07 65.00 575.00 471.00 560.00 IM 0703-331 WB I-70 AT M.P. 259.70 AND M. 09/06/07 35.00 550.00 653.59 579.35 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 120.00 450.00 468.25 385.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 261.00 385.00 460.13 440.00 C R600 - 300 VARIOUS LOCATIONS IN REGION 6 09/27/07 75.00 500.00 672.09 670.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,934.00 501.31 520.90 487.31 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 45.00 450.00 464.45 420.00 BR R300-130 I-70 (VARIOUS LOCATIONS) 10/18/07 60.00 385.00 663.33 650.00 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 65.00 425.00 468.75 475.00 SHE0092-019 SH 9 NORTH OF SILVERTHORNE, I 10/18/07 25.00 518.50 640.25 519.75 IM 0703-336 WB I-70 AT M.P. 259.70 AND M. 10/18/07 30.00 442.00 610.69 545.00 STA 340A-013 SH 340 IN FRUITA 10/25/07 120.00 550.00 520.00 565.00 C 0504-055 PUEBLO COUNTY, US-50C AT SALT 11/01/07 40.00 500.00 398.33 435.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 175.00 495.75 391.33 310.00 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 90.00 650.00 407.39 328.00 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 245.00 475.00 406.37 450.00 SHE 082A-010 SH 82 AND BUFFALO VALLEY ROAD 11/29/07 20.00 600.00 678.00 702.00 C120A-007 ON SH 120 AT PORTLAND OVER TH 11/29/07 10.00 480.00 287.50 275.00 C0703-338 CLEAR CREEK COUNTY 12/05/07 10.00 1500.00 1521.00 1895.00 STSR400-229 SH 14, SH 93, & SH 157 IN BOU 12/06/07 100.00 480.00 455.80 322.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 390.00 500.00 431.72 500.00 CC 0821-084 SH82 ASPEN 12/20/07 40.00 500.00 641.58 522.50 SHE 160A-009 U.S. 160 MP 94.15 - MP 96.63 12/20/07 40.00 525.00 434.46 467.82 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,505.00 505.40 449.45 465.04 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,346.00 499.17 538.51 552.61 =============== 630-00015 Uniformed Traf Ctrl Coordination Hour =================================================== NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 300.00 60.00 52.00 55.00 NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 300.00 75.00 40.08 10.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 456 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00015 Uniformed Traf Ctrl Coordination Hour =================================================== NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 300.00 60.00 57.73 77.50 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 48.00 35.00 57.67 54.00 IM0252-388 I-25 LARKSPUR INTERCHANGE NOR 03/08/07 650.00 50.00 10.82 5.10 IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 600.00 60.00 73.76 73.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,198.00 58.54 49.61 42.06 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 10.00 80.00 34.11 49.95 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 400.00 80.00 49.91 20.15 NH0341-071 US 34: GARFIELD TO MORNING DR 06/14/07 300.00 40.00 15.00 10.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 400.00 50.00 9.42 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,110.00 58.38 28.35 16.18 BR 0253-192 I-25&128TH 08/16/07 336.00 65.00 13.75 16.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 60.00 60.00 63.76 63.50 IM R400-215 I-25 & I-76 VMS INSTALLATION 09/06/07 128.00 40.00 42.00 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 524.00 58.32 25.50 20.22 C 0504-055 PUEBLO COUNTY, US-50C AT SALT 11/01/07 20.00 40.00 7.83 2.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 250.00 60.00 44.14 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 270.00 58.52 42.74 14.04 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,102.00 58.47 41.61 30.42 =============== 630-00020 Traf Ctrl Vehicle Day ==================================================== STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 13.00 350.00 168.88 139.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 13.00 350.00 168.88 139.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13.00 350.00 168.88 139.00 =============== 630-00025 Traf Ctrl Vehicle Hour =================================================== BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 435.00 18.00 28.81 4.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 435.00 18.00 28.81 4.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 435.00 18.00 28.81 4.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 457 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80001 Flash Beacon (Port) Each =================================================== HB 0063-021 US 6: RIFLE TO NEW CASTLE 01/04/07 2.00 1000.00 647.83 310.00 STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 2.00 1000.00 1438.00 1600.00 NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 4.00 850.00 706.83 866.00 STA 086A-045 SH 86 - FRANKTOWN TO ELBERT C 02/01/07 2.00 800.00 603.36 667.80 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 2.00 850.00 584.05 77.50 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 3.00 750.00 576.92 540.00 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 4.00 900.00 1198.33 1225.00 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 3.00 1500.00 941.67 1100.00 IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 6.00 1000.00 1215.57 1050.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 28.00 966.07 942.68 889.09 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 2.00 567.87 700.40 900.00 NH 030A-025 SH30 (HAVANA)- PARKER TO FLOR 04/19/07 4.00 1000.00 562.57 600.00 NH 0405-025 KIT CARSON BRIDGE 04/26/07 6.00 1292.13 1221.71 1100.00 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 8.00 750.00 805.41 634.00 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 4.00 1000.00 466.10 231.50 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 3.00 1000.00 1025.00 1500.00 IM 0253-196 I-25: 48TH AVE TO US 36 225: 05/31/07 9.00 800.00 2415.00 2240.00 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 8.00 1500.00 598.33 750.00 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 4.00 715.56 708.08 543.77 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 4.00 800.00 1494.33 1550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 52.00 983.67 1033.40 1073.71 BR 0253-192 I-25&128TH 08/16/07 4.00 800.00 950.67 1610.00 CR100-126 WEST OF KIT CARSON 08/16/07 4.00 656.13 1497.76 1700.00 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 3.00 2000.00 888.89 1500.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 2.00 1800.00 676.35 673.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 13.00 1186.50 1074.44 1468.15 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 6.00 800.00 550.00 350.00 C 0504-055 PUEBLO COUNTY, US-50C AT SALT 11/01/07 4.00 860.00 116.67 125.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 4.00 687.50 298.21 310.00 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 6.00 1000.00 1223.02 660.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 4.00 1200.00 1401.13 775.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 24.00 907.92 795.30 454.17 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 117.00 986.46 958.93 946.27 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 458 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80002 Flash Beacon (Solar) Each =================================================== STA 0961-012 SH 96, OVERLAY IN PUEBLO 01/04/07 2.00 1000.00 330.08 115.40 IM 0702-270 I 70 THROUGH GLENWOOD CANYON 01/11/07 10.00 1000.00 573.33 670.00 STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 4.00 600.00 535.17 565.00 BR 109A-018 SH 109 LA JUNTA, SH50, MANZI 01/11/07 14.00 1000.00 1460.63 1221.25 STA 012A-042 SH 12, S. OF LA VETA 01/18/07 4.00 1000.00 670.00 795.00 STA 069A-021 SH 69, W. OF WALSENBURG 01/25/07 4.00 1000.00 376.75 220.00 IM 0253-194 ON I-25 IN WELD COUNTY 01/25/07 4.00 600.00 1966.67 2000.00 NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 2.00 750.00 555.00 555.00 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 2.00 750.00 1066.67 1250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 46.00 908.70 847.22 912.14 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 4.00 1000.00 2183.00 1332.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 12.00 625.00 1232.34 352.34 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 8.00 1250.00 843.55 765.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 24.00 895.83 1261.18 653.17 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 4.00 500.00 252.00 236.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 500.00 252.00 236.00 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 2.00 500.00 1553.70 1463.40 C120A-007 ON SH 120 AT PORTLAND OVER TH 11/29/07 4.00 460.00 117.50 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 473.33 787.73 561.13 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 80.00 851.75 951.32 774.31 =============== 630-80305 Flagging Station Light Each =================================================== BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 4.00 500.00 1041.96 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 500.00 1041.96 1000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 500.00 1041.96 1000.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 459 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80332 Barricade (3 F-B) (Temp) Each =================================================== C0701-187 I-70 20 ROAD BRIDGE REPAIR 09/06/07 2.00 300.00 471.60 520.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 300.00 471.60 520.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 300.00 471.60 520.00 =============== 630-80335 Barricade (3 M-A) (Temp) Each =================================================== HB 0063-021 US 6: RIFLE TO NEW CASTLE 01/04/07 2.00 300.00 342.00 404.00 NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 12.00 150.00 171.58 55.00 BR 109A-018 SH 109 LA JUNTA, SH50, MANZI 01/11/07 1.00 50.00 170.63 305.25 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 27.00 225.00 146.00 110.00 NH 0062-023 SH 6, CLEAR CREEK CANYON 02/08/07 2.00 150.00 161.08 110.00 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 10.00 150.00 207.62 77.50 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 6.00 250.00 132.34 174.00 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 4.00 280.00 210.00 80.00 IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 6.00 250.00 247.28 210.00 SHE 0504-050 INTERSECTION OF SH 50B AND SH 03/22/07 4.00 50.00 67.33 254.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 74.00 197.91 171.08 126.77 NH 030A-025 SH30 (HAVANA)- PARKER TO FLOR 04/19/07 3.00 150.00 276.53 260.00 NH 0405-025 KIT CARSON BRIDGE 04/26/07 8.00 163.87 213.95 330.00 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 8.00 250.00 259.34 242.50 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 20.00 250.00 127.51 173.50 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 3.00 350.00 250.00 300.00 IM 0253-196 I-25: 48TH AVE TO US 36 225: 05/31/07 3.00 250.00 484.25 448.00 BR 059A-032 ON SH 59 IN SEDGWICK COUNTY 06/07/07 2.00 200.00 223.64 400.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 2.00 180.00 162.46 153.00 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 3.00 300.77 241.79 244.70 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 12.00 250.00 180.67 53.00 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 2.00 180.00 250.51 217.82 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 66.00 236.11 196.96 211.91 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 4.00 175.00 198.42 258.37 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 4.00 240.00 147.61 175.00 C065A-020 SH65 GRAND MESA SLIDE REPAIR 07/26/07 2.00 400.00 203.33 200.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 460 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80335 Barricade (3 M-A) (Temp) Each =================================================== NH 5502-055 COALBANK PASS 08/09/07 6.00 200.00 22.50 23.00 BR 0253-192 I-25&128TH 08/16/07 20.00 250.00 242.26 170.00 CR100-126 WEST OF KIT CARSON 08/16/07 3.00 264.27 281.53 180.00 C0701-190 26.5 ROAD/I-70 BRIDGE REPAIR 08/27/07 2.00 100.00 125.67 100.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 6.00 200.00 171.92 171.50 C R600 - 300 VARIOUS LOCATIONS IN REGION 6 09/27/07 6.00 400.00 242.84 134.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 53.00 250.05 208.93 155.56 SHE0092-019 SH 9 NORTH OF SILVERTHORNE, I 10/18/07 2.00 224.00 160.40 168.00 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 2.00 170.00 195.79 150.00 C0703-338 CLEAR CREEK COUNTY 12/05/07 5.00 75.00 137.33 63.00 STSR400-229 SH 14, SH 93, & SH 157 IN BOU 12/06/07 4.00 125.00 210.80 225.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 12.00 200.00 175.44 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 25.00 162.52 176.62 194.04 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 218.00 218.09 187.63 167.26 =============== 630-80336 Barricade (3 M-B) (Temp) Each =================================================== STA 0961-012 SH 96, OVERLAY IN PUEBLO 01/04/07 3.00 300.00 122.25 69.25 NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 10.00 200.00 213.58 121.00 NH 0062-023 SH 6, CLEAR CREEK CANYON 02/08/07 4.00 200.00 173.83 110.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 14.00 32.00 98.18 91.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 31.00 133.81 148.98 101.39 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 6.00 134.88 332.82 210.00 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 4.00 200.00 171.63 166.50 BR 059A-032 ON SH 59 IN SEDGWICK COUNTY 06/07/07 2.00 300.00 438.40 750.00 NH0341-071 US 34: GARFIELD TO MORNING DR 06/14/07 10.00 125.00 177.00 121.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 4.00 300.00 292.51 280.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 26.00 179.20 281.07 221.38 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 2.00 200.00 416.67 500.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 461 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80336 Barricade (3 M-B) (Temp) Each =================================================== BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 10.00 250.00 154.44 154.00 IM0703-323 GEORGETOWN HILL CHUTE 2 AND 3 08/30/07 5.00 209.67 80.62 209.49 C0701-187 I-70 20 ROAD BRIDGE REPAIR 09/06/07 9.00 250.00 116.40 130.00 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 2.00 250.00 31.08 29.50 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 6.00 300.00 352.00 310.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 34.00 249.95 167.84 196.37 STA 340A-013 SH 340 IN FRUITA 10/25/07 3.00 250.00 211.50 226.00 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 4.00 250.00 222.63 150.00 C120A-007 ON SH 120 AT PORTLAND OVER TH 11/29/07 2.00 250.00 58.00 55.00 CC 0821-084 SH82 ASPEN 12/20/07 14.00 200.00 225.71 165.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 23.00 219.57 213.73 160.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 114.00 196.10 202.85 169.06 =============== 630-80337 Barricade (3 M-C) (Temp) Each =================================================== BR 109A-018 SH 109 LA JUNTA, SH50, MANZI 01/11/07 2.00 50.00 389.75 712.50 NH 0062-023 SH 6, CLEAR CREEK CANYON 02/08/07 1.00 350.00 158.00 110.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 5.00 430.00 201.50 189.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 325.00 221.18 310.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 12.00 625.00 391.67 251.68 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12.00 625.00 391.67 251.68 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 505.00 333.28 275.01 =============== 630-80338 Barricade (3 M-D) (Temp) Each =================================================== IM 0702-270 I 70 THROUGH GLENWOOD CANYON 01/11/07 8.00 450.00 686.67 800.00 BR 109A-018 SH 109 LA JUNTA, SH50, MANZI 01/11/07 2.00 60.00 497.50 916.00 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 2.00 450.00 355.00 330.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12.00 385.00 579.47 741.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 462 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80338 Barricade (3 M-D) (Temp) Each =================================================== IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 3.00 450.00 429.56 410.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 450.00 429.56 410.00 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 2.00 500.00 371.82 302.77 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 500.00 371.82 302.77 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17.00 410.00 505.94 631.03 =============== 630-80341 Const Traf Sign (A) Each =================================================== HB 0063-021 US 6: RIFLE TO NEW CASTLE 01/04/07 81.00 60.00 70.50 75.00 STA 0961-012 SH 96, OVERLAY IN PUEBLO 01/04/07 20.00 60.00 29.86 17.30 NH 0501-054 US 50 IN GUNNISON COUNTY 01/04/07 102.00 65.00 46.67 45.00 STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 6.00 60.00 74.24 102.00 IM 0702-269 I 70 IN EAGLE COUNTY 01/11/07 68.00 70.00 78.00 88.00 IM 0702-270 I 70 THROUGH GLENWOOD CANYON 01/11/07 104.00 70.00 57.50 67.00 STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 50.00 65.00 51.00 50.00 NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 78.00 60.00 62.98 55.00 BR 109A-018 SH 109 LA JUNTA, SH50, MANZI 01/11/07 54.00 30.00 69.75 91.50 STA 012A-042 SH 12, S. OF LA VETA 01/18/07 88.00 60.00 28.75 11.00 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 73.00 55.00 87.40 80.00 STA 069A-021 SH 69, W. OF WALSENBURG 01/25/07 120.00 60.00 45.85 46.00 NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 26.00 65.00 55.58 32.00 SHE 0931-027 SH 93 @ SH 72 01/25/07 36.00 60.00 21.72 14.00 IM 0253-194 ON I-25 IN WELD COUNTY 01/25/07 16.00 55.00 68.33 45.00 NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 48.00 70.00 100.00 100.00 STA 0661-009 ON SH 66 IN WELD COUNTY 02/01/07 8.00 55.00 61.91 77.00 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 31.00 70.00 64.60 69.00 STA 086A-045 SH 86 - FRANKTOWN TO ELBERT C 02/01/07 6.00 80.00 63.79 38.95 STA 1251-005 SH 125 AND 127 NORTH OF COWDR 02/08/07 100.00 70.00 71.53 75.00 NH 0402-070 US 40 ROUTT COUNTY 02/08/07 37.00 70.00 58.00 71.00 NH 0062-023 SH 6, CLEAR CREEK CANYON 02/08/07 13.00 75.00 36.77 22.00 HB 149A-023 SOUTH FORK TO CREEDE - SHOULD 02/08/07 4.00 20.00 29.25 55.00 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 126.00 60.00 53.74 56.75 NH 1602-102 WITHIN THE ALAMOSA CITY LIMIT 02/15/07 18.00 80.00 91.50 33.00 SHE 1151-020 SH 115 VMS, MP 17 AND MP 41 02/15/07 25.00 61.00 25.59 32.04 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 246.00 80.00 57.67 54.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 463 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80341 Const Traf Sign (A) Each =================================================== IM0252-388 I-25 LARKSPUR INTERCHANGE NOR 03/08/07 44.00 70.00 67.25 82.15 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 49.00 60.00 69.62 50.00 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 21.00 70.00 32.69 11.00 SHE 1151-018 SH 115 - GUMAER AVENUE EAST 03/08/07 36.00 65.00 49.67 33.00 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 12.00 70.00 74.67 100.00 HB 065A-019 SH 65 THRU CEDAREDGE 03/08/07 43.00 75.00 24.83 50.00 STA0091-030 SH 9 BETWEEN FAIRPLAY AND ALM 03/22/07 6.00 60.00 79.48 95.00 IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 80.00 60.00 96.22 105.00 SHE 0504-050 INTERSECTION OF SH 50B AND SH 03/22/07 51.00 50.00 34.18 69.88 STA402A-007 SH 402 & I-25 OFFRAMS AND E. 03/22/07 2.00 60.00 59.75 64.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,928.00 64.78 57.24 59.36 SHE 165A-011 ALONG SH 165 N/O RYE 04/05/07 4.00 20.00 15.65 11.00 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 29.00 52.24 69.50 90.00 NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 26.00 75.00 35.75 27.00 NH 030A-025 SH30 (HAVANA)- PARKER TO FLOR 04/19/07 28.00 60.00 68.11 48.00 NH 0405-025 KIT CARSON BRIDGE 04/26/07 12.00 62.73 72.56 100.00 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 32.00 65.00 25.83 25.00 SHE 0251-175 ALONG I 25 NORTH OF THE CITY 04/26/07 8.00 65.00 27.09 13.15 STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 8.00 48.66 53.98 35.40 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 29.00 65.00 79.43 77.70 STA0712-015 SH 71: NEBRASKA STATE LINE SO 05/10/07 8.00 65.00 75.00 75.00 STA0631-009 SH 63 IN WASHINGTON COUNTY 05/10/07 8.00 65.00 75.00 75.00 STA0343-029 ON US 34 EAST OF YUMA IN YUMA 05/10/07 8.00 65.00 75.00 75.00 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 26.00 90.00 74.86 68.00 STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 12.00 49.81 72.40 77.65 SHE0761-193 I-76: SHERIDAN TO I-25 (M.P. 05/17/07 8.00 60.00 85.96 105.80 IM0703-317 FROM MP 221.30 TO MP 251.30 J 05/17/07 4.00 48.89 118.33 120.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 161.00 90.00 75.32 40.26 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 58.00 60.00 39.64 25.50 NH 3851-016 US 385 NORTH OF BURLINGTON 05/24/07 20.00 33.26 70.33 36.00 SHE 133A-032 SH 133 BETWEEN REDSTONE AND M 05/24/07 28.00 50.00 38.06 36.75 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 67.00 70.00 62.50 100.00 CR400-216 SIGNALS @ US34 & SH37, KERSEY 05/24/07 6.00 60.00 62.00 54.00 IM 0253-196 I-25: 48TH AVE TO US 36 225: 05/31/07 42.00 60.00 90.75 84.00 STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 40.00 65.00 48.30 35.00 BR 059A-032 ON SH 59 IN SEDGWICK COUNTY 06/07/07 18.00 60.00 92.96 120.00 IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 6.00 60.00 100.00 110.00 NH0341-071 US 34: GARFIELD TO MORNING DR 06/14/07 82.00 40.00 48.33 35.00 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 20.00 60.00 71.83 90.00 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 47.00 70.00 48.67 60.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 160.00 100.00 86.66 80.00 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 2.00 38.31 66.50 70.69 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 78.00 60.00 84.33 70.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 464 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80341 Const Traf Sign (A) Each =================================================== BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 42.00 70.00 43.39 85.95 CR600-285 VARIOUS LOCATIONS IN REGION 6 06/28/07 39.00 75.00 101.00 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,166.00 70.38 66.26 62.99 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 12.00 60.00 38.29 72.08 BRR500-087 US 160 PAGOSA SPRINGS 07/12/07 22.00 50.00 44.00 43.00 SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 25.00 60.00 32.00 32.00 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 10.00 60.00 14.44 11.00 C065A-020 SH65 GRAND MESA SLIDE REPAIR 07/26/07 23.00 75.00 36.67 30.00 SHE 0702-267 NEAR VAIL IN EAGLE COUNTY 08/02/07 4.00 64.50 40.55 35.00 NH 5502-055 COALBANK PASS 08/09/07 22.00 40.00 33.75 34.50 ITS SW00-457 DRCOG REGION 08/09/07 4.00 60.00 53.38 36.75 BR 0253-192 I-25&128TH 08/16/07 115.00 60.00 53.09 56.00 CR100-126 WEST OF KIT CARSON 08/16/07 14.00 65.00 63.26 40.00 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 18.00 60.00 59.72 75.00 C0701-190 26.5 ROAD/I-70 BRIDGE REPAIR 08/27/07 9.00 41.00 37.33 41.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 50.00 85.00 10.44 10.50 IM0703-323 GEORGETOWN HILL CHUTE 2 AND 3 08/30/07 13.00 73.23 50.39 78.56 IM R400-215 I-25 & I-76 VMS INSTALLATION 09/06/07 6.00 75.00 85.93 110.00 C0701-187 I-70 20 ROAD BRIDGE REPAIR 09/06/07 51.00 60.00 17.80 20.00 IM 0703-331 WB I-70 AT M.P. 259.70 AND M. 09/06/07 12.00 60.00 93.21 110.35 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 4.00 70.00 25.17 23.50 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 15.00 25.00 39.88 36.00 C R600 - 300 VARIOUS LOCATIONS IN REGION 6 09/27/07 6.00 75.00 76.16 43.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 435.00 61.65 40.81 42.80 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 4.00 65.00 43.90 53.00 BR R300-130 I-70 (VARIOUS LOCATIONS) 10/18/07 48.00 100.00 44.67 44.00 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 18.00 55.00 35.75 30.00 SHE0092-019 SH 9 NORTH OF SILVERTHORNE, I 10/18/07 10.00 56.00 50.40 42.00 IM 0703-336 WB I-70 AT M.P. 259.70 AND M. 10/18/07 12.00 66.25 77.19 110.00 STA 340A-013 SH 340 IN FRUITA 10/25/07 51.00 70.00 55.58 79.00 C 0504-055 PUEBLO COUNTY, US-50C AT SALT 11/01/07 16.00 65.00 12.00 13.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 6.00 67.50 54.59 57.00 BR 0241-047 US 24, 2 MI S OF GRANITE, CHA 11/15/07 30.00 65.00 69.54 101.48 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 10.00 60.00 74.76 65.60 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 23.00 70.00 52.39 26.00 C120A-007 ON SH 120 AT PORTLAND OVER TH 11/29/07 12.00 70.00 24.00 23.00 STSR400-229 SH 14, SH 93, & SH 157 IN BOU 12/06/07 87.00 60.00 76.03 53.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 92.00 70.00 59.35 40.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 465 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80341 Const Traf Sign (A) Each =================================================== CC 0821-084 SH82 ASPEN 12/20/07 23.00 37.00 36.75 22.00 SHE 160A-009 U.S. 160 MP 94.15 - MP 96.63 12/20/07 18.00 60.00 58.35 23.39 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 460.00 67.42 58.33 49.95 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,989.00 66.38 58.21 57.53 =============== 630-80342 Const Traf Sign (B) Each =================================================== HB 0063-021 US 6: RIFLE TO NEW CASTLE 01/04/07 4.00 80.00 79.50 82.00 STA 0961-012 SH 96, OVERLAY IN PUEBLO 01/04/07 85.00 80.00 38.02 23.10 NH 0501-054 US 50 IN GUNNISON COUNTY 01/04/07 26.00 80.00 46.67 45.00 STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 72.00 80.00 93.29 130.00 IM 0702-269 I 70 IN EAGLE COUNTY 01/11/07 97.00 80.00 86.00 94.00 IM 0702-270 I 70 THROUGH GLENWOOD CANYON 01/11/07 116.00 80.00 62.92 73.00 STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 60.00 80.00 60.73 55.00 NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 76.00 75.00 75.79 55.00 BR 109A-018 SH 109 LA JUNTA, SH50, MANZI 01/11/07 125.00 40.00 96.13 122.25 STA 012A-042 SH 12, S. OF LA VETA 01/18/07 22.00 80.00 38.58 11.00 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 216.00 65.00 120.00 110.00 STA 069A-021 SH 69, W. OF WALSENBURG 01/25/07 24.00 80.00 56.00 56.00 NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 66.00 75.00 71.50 43.00 SHE 0931-027 SH 93 @ SH 72 01/25/07 60.00 70.00 30.10 14.00 IM 0253-194 ON I-25 IN WELD COUNTY 01/25/07 66.00 65.00 123.67 166.00 NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 83.00 80.00 110.00 110.00 STA 0661-009 ON SH 66 IN WELD COUNTY 02/01/07 34.00 80.00 104.37 110.00 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 54.00 100.00 82.73 95.00 STA 086A-045 SH 86 - FRANKTOWN TO ELBERT C 02/01/07 26.00 90.00 82.56 66.80 STA 1251-005 SH 125 AND 127 NORTH OF COWDR 02/08/07 61.00 80.00 86.33 85.00 NH 0402-070 US 40 ROUTT COUNTY 02/08/07 198.00 80.00 79.00 93.00 NH 0062-023 SH 6, CLEAR CREEK CANYON 02/08/07 46.00 80.00 50.60 22.00 HB 149A-023 SOUTH FORK TO CREEDE - SHOULD 02/08/07 20.00 25.00 28.33 45.00 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 42.00 75.00 69.36 77.40 NH 1602-102 WITHIN THE ALAMOSA CITY LIMIT 02/15/07 54.00 85.00 91.50 33.00 SHE 1151-020 SH 115 VMS, MP 17 AND MP 41 02/15/07 15.00 78.00 33.70 42.71 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 48.00 90.00 46.48 43.20 SHE 5502-054 02/22/07 14.00 150.00 89.18 166.40 IM0252-388 I-25 LARKSPUR INTERCHANGE NOR 03/08/07 92.00 80.00 85.93 82.15 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 22.00 80.00 80.03 75.00 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 26.00 80.00 42.26 14.50 SHE 1151-018 SH 115 - GUMAER AVENUE EAST 03/08/07 7.00 80.00 74.79 40.00 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 73.00 80.00 105.48 163.00 HB 065A-019 SH 65 THRU CEDAREDGE 03/08/07 78.00 80.00 30.00 55.00 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 51.00 100.00 85.00 80.00 STA0091-030 SH 9 BETWEEN FAIRPLAY AND ALM 03/22/07 35.00 80.00 92.48 140.00 IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 86.00 80.00 106.56 105.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 466 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80342 Const Traf Sign (B) Each =================================================== SHE 0504-050 INTERSECTION OF SH 50B AND SH 03/22/07 12.00 60.00 42.12 86.59 STA402A-007 SH 402 & I-25 OFFRAMS AND E. 03/22/07 32.00 75.00 86.50 96.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,324.00 76.48 78.94 84.62 SHE 165A-011 ALONG SH 165 N/O RYE 04/05/07 8.00 20.00 21.96 14.00 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 45.00 68.77 82.15 90.00 NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 68.00 80.00 47.00 27.00 NH 030A-025 SH30 (HAVANA)- PARKER TO FLOR 04/19/07 67.00 80.00 76.14 65.00 NH 0405-025 KIT CARSON BRIDGE 04/26/07 52.00 65.58 89.76 130.00 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 69.00 70.00 43.00 40.00 SHE 0251-175 ALONG I 25 NORTH OF THE CITY 04/26/07 29.00 80.00 32.27 21.00 STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 50.00 84.35 66.49 47.20 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 55.00 75.00 108.45 88.80 STA0712-015 SH 71: NEBRASKA STATE LINE SO 05/10/07 48.00 75.00 75.00 75.00 STA0631-009 SH 63 IN WASHINGTON COUNTY 05/10/07 48.00 75.00 75.00 75.00 STA0343-029 ON US 34 EAST OF YUMA IN YUMA 05/10/07 44.00 75.00 75.00 75.00 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 48.00 100.00 116.42 88.50 STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 53.00 64.90 83.58 77.65 SHE0761-193 I-76: SHERIDAN TO I-25 (M.P. 05/17/07 36.00 80.00 85.96 105.80 IM0703-317 FROM MP 221.30 TO MP 251.30 J 05/17/07 42.00 63.27 120.00 120.00 STA 0703-312 I-70 HIDDEN VALLEY AND FALL R 05/17/07 10.00 53.77 75.00 75.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 98.00 100.00 85.35 60.40 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 84.00 80.00 59.36 32.50 NH 3851-016 US 385 NORTH OF BURLINGTON 05/24/07 62.00 86.88 83.67 41.00 SHE 133A-032 SH 133 BETWEEN REDSTONE AND M 05/24/07 40.00 60.00 39.31 36.75 CR400-216 SIGNALS @ US34 & SH37, KERSEY 05/24/07 28.00 75.00 62.00 54.00 IM 0253-196 I-25: 48TH AVE TO US 36 225: 05/31/07 60.00 80.00 181.00 168.00 STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 81.00 75.00 67.42 45.00 BR 059A-032 ON SH 59 IN SEDGWICK COUNTY 06/07/07 6.00 80.00 140.01 175.00 IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 35.00 75.00 135.00 120.00 NH0341-071 US 34: GARFIELD TO MORNING DR 06/14/07 82.00 50.00 71.67 55.00 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 24.00 80.00 77.33 90.00 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 36.00 75.00 85.67 115.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 97.00 140.00 120.26 110.00 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 82.00 78.37 82.04 81.57 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 70.00 80.00 169.33 170.00 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 4.00 80.00 66.57 233.18 ITSSW00-378 VMS REPLACEMENT IN REGIONS 1, 06/21/07 70.00 80.00 116.37 124.10 CR600-285 VARIOUS LOCATIONS IN REGION 6 06/28/07 10.00 85.00 101.00 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,741.00 79.99 86.23 80.49 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 102.00 70.00 42.94 135.33 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 467 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80342 Const Traf Sign (B) Each =================================================== BRR500-087 US 160 PAGOSA SPRINGS 07/12/07 66.00 100.00 47.50 50.00 SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 12.00 70.00 47.00 47.00 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 70.00 75.00 27.88 22.00 C065A-020 SH65 GRAND MESA SLIDE REPAIR 07/26/07 10.00 90.00 43.33 35.00 SHE 0702-267 NEAR VAIL IN EAGLE COUNTY 08/02/07 34.00 78.50 41.64 35.00 NH 5502-055 COALBANK PASS 08/09/07 54.00 40.00 56.25 57.50 ITS SW00-457 DRCOG REGION 08/09/07 34.00 90.00 74.38 78.75 C0702-273 I-70 GLENWOOD CANYON 08/09/07 62.00 82.00 25.00 25.00 BR 0253-192 I-25&128TH 08/16/07 114.00 80.00 74.31 100.00 CR100-126 WEST OF KIT CARSON 08/16/07 39.00 69.04 78.51 45.00 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 43.00 80.00 81.39 135.00 C0701-190 26.5 ROAD/I-70 BRIDGE REPAIR 08/27/07 20.00 46.00 40.67 46.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 16.00 85.00 11.45 11.50 IM0703-323 GEORGETOWN HILL CHUTE 2 AND 3 08/30/07 32.00 87.01 77.66 146.64 ITSSW00-455 VMS REPLACEMENT IN REGIONS 1, 08/30/07 52.00 130.00 101.00 110.00 IM R400-215 I-25 & I-76 VMS INSTALLATION 09/06/07 10.00 120.00 141.80 163.00 C0701-187 I-70 20 ROAD BRIDGE REPAIR 09/06/07 114.00 70.00 17.80 20.00 IM 0703-331 WB I-70 AT M.P. 259.70 AND M. 09/06/07 18.00 75.00 123.30 220.70 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 16.00 85.00 37.00 35.50 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 56.00 25.00 41.13 36.00 C R600 - 300 VARIOUS LOCATIONS IN REGION 6 09/27/07 30.00 100.00 141.70 134.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,004.00 76.76 53.67 72.75 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 34.00 70.00 68.61 80.00 BR R300-130 I-70 (VARIOUS LOCATIONS) 10/18/07 148.00 115.00 51.67 50.00 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 8.00 85.00 45.00 40.00 SHE0092-019 SH 9 NORTH OF SILVERTHORNE, I 10/18/07 26.00 75.00 55.25 47.25 IM 0703-336 WB I-70 AT M.P. 259.70 AND M. 10/18/07 18.00 71.25 82.19 110.00 STA 340A-013 SH 340 IN FRUITA 10/25/07 44.00 80.00 61.34 90.00 C 0504-055 PUEBLO COUNTY, US-50C AT SALT 11/01/07 40.00 80.00 14.33 15.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 74.00 78.00 64.06 68.00 BR 0241-047 US 24, 2 MI S OF GRANITE, CHA 11/15/07 2.00 80.00 91.56 118.40 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 30.00 70.00 95.39 80.74 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 16.00 85.00 61.61 26.00 SHE 082A-010 SH 82 AND BUFFALO VALLEY ROAD 11/29/07 23.00 60.00 33.88 12.00 C120A-007 ON SH 120 AT PORTLAND OVER TH 11/29/07 6.00 80.00 35.25 33.00 C0703-338 CLEAR CREEK COUNTY 12/05/07 10.00 50.00 80.67 32.00 STSR400-229 SH 14, SH 93, & SH 157 IN BOU 12/06/07 11.00 75.00 95.45 108.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 78.00 90.00 82.72 40.00 CC 0821-084 SH82 ASPEN 12/20/07 48.00 50.00 36.75 22.00 SHE 160A-009 U.S. 160 MP 94.15 - MP 96.63 12/20/07 54.00 76.00 66.35 23.39 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 670.00 83.78 62.96 50.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,739.00 78.44 74.61 77.29 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 468 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80343 Const Traf Sign (C) Each =================================================== STA 0961-012 SH 96, OVERLAY IN PUEBLO 01/04/07 15.00 90.00 44.17 28.85 NH 0501-054 US 50 IN GUNNISON COUNTY 01/04/07 4.00 120.00 46.67 45.00 IM 0702-269 I 70 IN EAGLE COUNTY 01/11/07 32.00 120.00 94.50 100.00 STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 2.00 90.00 74.36 65.00 NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 8.00 110.00 81.00 55.00 BR 109A-018 SH 109 LA JUNTA, SH50, MANZI 01/11/07 40.00 50.00 117.38 152.75 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 46.00 85.00 125.00 115.00 SHE 0931-027 SH 93 @ SH 72 01/25/07 12.00 80.00 33.32 14.00 IM 0253-194 ON I-25 IN WELD COUNTY 01/25/07 30.00 75.00 128.67 166.00 NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 12.00 90.00 110.00 110.00 STA 086A-045 SH 86 - FRANKTOWN TO ELBERT C 02/01/07 4.00 100.00 101.76 66.80 STA 1251-005 SH 125 AND 127 NORTH OF COWDR 02/08/07 38.00 100.00 116.83 125.00 NH 0402-070 US 40 ROUTT COUNTY 02/08/07 16.00 120.00 92.50 120.00 NH 0062-023 SH 6, CLEAR CREEK CANYON 02/08/07 4.00 100.00 53.93 22.00 HB 149A-023 SOUTH FORK TO CREEDE - SHOULD 02/08/07 8.00 30.00 32.67 50.00 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 8.00 110.00 68.49 56.75 NH 1602-102 WITHIN THE ALAMOSA CITY LIMIT 02/15/07 8.00 90.00 166.50 33.00 IM0252-388 I-25 LARKSPUR INTERCHANGE NOR 03/08/07 28.00 90.00 91.18 82.15 HB 065A-019 SH 65 THRU CEDAREDGE 03/08/07 8.00 80.00 33.17 60.00 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 14.00 110.00 91.67 80.00 STA0091-030 SH 9 BETWEEN FAIRPLAY AND ALM 03/22/07 4.00 100.00 98.48 160.00 IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 16.00 110.00 125.89 105.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 357.00 90.06 98.26 102.56 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 12.00 72.78 94.28 90.00 NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 8.00 125.00 42.00 27.00 NH 030A-025 SH30 (HAVANA)- PARKER TO FLOR 04/19/07 16.00 20.00 81.61 72.00 NH 0405-025 KIT CARSON BRIDGE 04/26/07 18.00 101.82 105.66 150.00 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 8.00 75.00 35.33 35.00 SHE 0251-175 ALONG I 25 NORTH OF THE CITY 04/26/07 24.00 60.00 38.47 31.50 STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 8.00 89.71 81.15 59.00 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 10.00 90.00 123.00 111.00 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 8.00 110.00 160.07 109.50 STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 4.00 74.36 94.83 77.65 SHE0761-193 I-76: SHERIDAN TO I-25 (M.P. 05/17/07 12.00 90.00 85.96 105.80 IM0703-317 FROM MP 221.30 TO MP 251.30 J 05/17/07 26.00 98.32 120.00 120.00 STA 0703-312 I-70 HIDDEN VALLEY AND FALL R 05/17/07 10.00 64.74 75.00 75.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 22.00 110.00 185.17 104.69 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 8.00 90.00 79.31 81.00 NH 3851-016 US 385 NORTH OF BURLINGTON 05/24/07 8.00 83.89 103.73 46.20 SHE 133A-032 SH 133 BETWEEN REDSTONE AND M 05/24/07 8.00 70.00 40.81 36.75 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 4.00 120.00 137.50 250.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 469 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80343 Const Traf Sign (C) Each =================================================== IM 0253-196 I-25: 48TH AVE TO US 36 225: 05/31/07 8.00 100.00 181.00 168.00 STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 4.00 85.00 74.08 50.00 IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 26.00 95.00 140.00 130.00 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 8.00 90.00 86.58 90.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 42.00 150.00 124.19 115.00 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 22.00 78.20 92.56 92.44 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 8.00 100.00 179.33 195.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 332.00 93.81 103.27 98.72 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 34.00 100.00 56.73 231.58 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 10.00 90.00 36.92 33.00 SHE 0702-267 NEAR VAIL IN EAGLE COUNTY 08/02/07 30.00 84.80 42.65 35.00 ITS SW00-457 DRCOG REGION 08/09/07 8.00 100.00 74.38 78.75 BR 0253-192 I-25&128TH 08/16/07 8.00 100.00 89.69 135.00 CR100-126 WEST OF KIT CARSON 08/16/07 4.00 95.71 86.26 50.00 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 6.00 100.00 141.67 250.00 C0701-190 26.5 ROAD/I-70 BRIDGE REPAIR 08/27/07 14.00 51.00 44.00 51.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 2.00 100.00 9.31 9.00 IM0703-323 GEORGETOWN HILL CHUTE 2 AND 3 08/30/07 22.00 87.23 80.16 146.64 ITSSW00-455 VMS REPLACEMENT IN REGIONS 1, 08/30/07 18.00 135.00 101.00 110.00 IM R400-215 I-25 & I-76 VMS INSTALLATION 09/06/07 8.00 125.00 146.69 218.00 C0701-187 I-70 20 ROAD BRIDGE REPAIR 09/06/07 14.00 90.00 17.90 20.00 IM 0703-331 WB I-70 AT M.P. 259.70 AND M. 09/06/07 8.00 95.00 155.89 331.06 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 12.00 95.00 40.33 37.80 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 7.00 25.00 42.38 36.00 C R600 - 300 VARIOUS LOCATIONS IN REGION 6 09/27/07 20.00 120.00 145.70 134.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 225.00 95.22 70.91 118.49 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 14.00 95.00 79.05 90.00 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 6.00 95.00 56.25 55.00 SHE0092-019 SH 9 NORTH OF SILVERTHORNE, I 10/18/07 2.00 88.00 62.31 52.55 IM 0703-336 WB I-70 AT M.P. 259.70 AND M. 10/18/07 8.00 83.00 75.94 110.00 STA 340A-013 SH 340 IN FRUITA 10/25/07 12.00 85.00 67.25 100.00 C 0504-055 PUEBLO COUNTY, US-50C AT SALT 11/01/07 8.00 90.00 18.00 18.00 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 4.00 100.00 70.71 26.00 C120A-007 ON SH 120 AT PORTLAND OVER TH 11/29/07 2.00 90.00 47.25 44.00 C0703-338 CLEAR CREEK COUNTY 12/05/07 14.00 60.00 80.00 32.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 8.00 100.00 100.02 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 78.00 85.90 73.61 62.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 992.00 92.16 90.73 101.74 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 470 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80344 Const Traf Sign (Spec) Sq Foot ================================================ HB 0063-021 US 6: RIFLE TO NEW CASTLE 01/04/07 76.00 25.00 23.96 25.75 IM 0702-270 I 70 THROUGH GLENWOOD CANYON 01/11/07 896.00 18.00 9.47 11.00 STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 816.00 18.00 16.78 17.00 NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 160.00 18.00 18.08 11.00 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 20.00 20.00 17.94 16.00 SHE 0931-027 SH 93 @ SH 72 01/25/07 64.00 18.00 16.44 14.00 NH 0062-023 SH 6, CLEAR CREEK CANYON 02/08/07 301.00 20.00 25.14 27.60 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 160.00 18.00 16.77 13.40 SHE 1151-020 SH 115 VMS, MP 17 AND MP 41 02/15/07 30.00 19.00 9.56 15.66 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 457.00 20.00 20.75 19.44 SHE 5502-054 02/22/07 48.00 16.00 29.23 27.00 IM0252-388 I-25 LARKSPUR INTERCHANGE NOR 03/08/07 64.00 25.00 19.28 27.40 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 140.00 18.00 21.64 23.00 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 154.00 19.00 11.20 5.90 SHE 1151-018 SH 115 - GUMAER AVENUE EAST 03/08/07 15.00 20.00 18.28 22.00 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 113.00 21.00 14.67 15.00 STA0091-030 SH 9 BETWEEN FAIRPLAY AND ALM 03/22/07 16.00 20.00 31.20 38.50 IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 580.00 18.00 21.44 20.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,110.00 18.74 17.82 17.12 SHE 165A-011 ALONG SH 165 N/O RYE 04/05/07 104.00 10.00 7.20 6.00 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 16.00 18.86 20.92 27.00 NH 030A-025 SH30 (HAVANA)- PARKER TO FLOR 04/19/07 32.00 20.00 23.27 25.00 NH 0405-025 KIT CARSON BRIDGE 04/26/07 238.00 19.18 16.43 20.00 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 80.00 15.00 24.33 25.00 SHE 0251-175 ALONG I 25 NORTH OF THE CITY 04/26/07 368.00 20.00 10.33 7.35 STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 96.00 14.42 15.98 18.90 SHE0761-193 I-76: SHERIDAN TO I-25 (M.P. 05/17/07 40.00 18.00 13.60 10.60 IM0703-317 FROM MP 221.30 TO MP 251.30 J 05/17/07 188.00 16.60 31.67 30.00 STA 0703-312 I-70 HIDDEN VALLEY AND FALL R 05/17/07 64.00 17.00 30.00 30.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 405.00 20.00 18.14 10.06 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 241.00 20.00 10.35 9.50 IM 0253-196 I-25: 48TH AVE TO US 36 225: 05/31/07 115.00 25.00 24.29 22.40 BR 059A-032 ON SH 59 IN SEDGWICK COUNTY 06/07/07 54.00 25.00 25.91 36.00 IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 94.00 13.00 26.00 30.00 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 160.00 20.00 26.04 31.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 1,749.00 20.00 16.05 15.00 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 73.00 14.49 16.85 16.31 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 200.00 20.00 21.33 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4,317.00 19.23 16.76 16.31 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 248.00 20.00 22.98 22.58 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 471 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80344 Const Traf Sign (Spec) Sq Foot ================================================ BRR500-087 US 160 PAGOSA SPRINGS 07/12/07 80.00 20.00 18.00 16.00 SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 25.00 20.00 17.00 17.00 SHE 0702-267 NEAR VAIL IN EAGLE COUNTY 08/02/07 40.00 17.60 27.19 25.00 NH 5502-055 COALBANK PASS 08/09/07 80.00 15.00 13.90 13.80 ITS SW00-457 DRCOG REGION 08/09/07 32.00 25.00 38.38 36.75 C0702-273 I-70 GLENWOOD CANYON 08/09/07 200.00 26.00 25.00 25.00 BR 0253-192 I-25&128TH 08/16/07 128.00 20.00 16.72 21.00 CR100-126 WEST OF KIT CARSON 08/16/07 1,201.00 19.63 19.25 15.00 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 60.00 20.00 23.34 30.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 200.00 20.00 9.31 9.00 IM0703-323 GEORGETOWN HILL CHUTE 2 AND 3 08/30/07 398.00 16.70 18.05 26.19 IM 0703-331 WB I-70 AT M.P. 259.70 AND M. 09/06/07 48.00 20.00 28.78 33.11 C R600 - 300 VARIOUS LOCATIONS IN REGION 6 09/27/07 165.00 20.00 20.99 10.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,905.00 19.69 19.46 18.47 IM 0703-336 WB I-70 AT M.P. 259.70 AND M. 10/18/07 48.00 18.75 20.20 22.00 C 0504-055 PUEBLO COUNTY, US-50C AT SALT 11/01/07 132.00 18.00 4.83 5.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 25.00 17.50 16.06 16.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 196.00 20.00 18.94 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 401.00 19.04 15.92 17.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,733.00 19.17 17.75 17.17 =============== 630-80348 Const Info Sign Each =================================================== STA 012A-042 SH 12, S. OF LA VETA 01/18/07 2.00 350.00 209.17 53.00 STA 069A-021 SH 69, W. OF WALSENBURG 01/25/07 2.00 350.00 270.00 290.00 SHE 1151-018 SH 115 - GUMAER AVENUE EAST 03/08/07 2.00 350.00 261.08 425.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 350.00 243.84 256.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 350.00 243.84 256.00 =============== 630-80350 Vert Panel Each =================================================== STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 350.00 20.00 10.67 10.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 400.00 70.00 23.65 15.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 750.00 46.67 18.51 12.72 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 472 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80350 Vert Panel Each =================================================== HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 150.00 35.00 25.39 42.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 150.00 35.00 25.39 42.90 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 900.00 44.72 20.65 17.75 =============== 630-80351 Vert Panel (Plastic) Each =================================================== SHE 1151-018 SH 115 - GUMAER AVENUE EAST 03/08/07 20.00 50.00 34.56 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 50.00 34.56 22.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 50.00 34.56 22.00 =============== 630-80355 Port Mesg Panel Each =================================================== STA 0961-012 SH 96, OVERLAY IN PUEBLO 01/04/07 2.00 6500.00 3456.00 3000.00 IM 0702-269 I 70 IN EAGLE COUNTY 01/11/07 2.00 7500.00 8850.00 8800.00 STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 2.00 7000.00 6937.33 7000.00 NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 3.00 6000.00 4033.33 3300.00 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 4.00 4000.00 6290.00 4500.00 NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 5.00 6174.39 5951.67 5500.00 SHE 0931-027 SH 93 @ SH 72 01/25/07 2.00 2500.00 2871.00 3260.00 IM 0253-194 ON I-25 IN WELD COUNTY 01/25/07 2.00 7000.00 16166.67 15500.00 NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 2.00 5000.00 3330.00 3330.00 STA 0661-009 ON SH 66 IN WELD COUNTY 02/01/07 2.00 7500.00 3968.07 4400.00 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 2.00 5500.00 4785.00 4200.00 STA 1251-005 SH 125 AND 127 NORTH OF COWDR 02/08/07 3.00 6000.00 7403.33 9500.00 NH 0402-070 US 40 ROUTT COUNTY 02/08/07 2.00 7500.00 8500.00 7000.00 HB 149A-023 SOUTH FORK TO CREEDE - SHOULD 02/08/07 2.00 500.00 1152.33 2500.00 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 2.00 6000.00 4890.08 2075.00 NH 1602-102 WITHIN THE ALAMOSA CITY LIMIT 02/15/07 2.00 5000.00 6650.00 3300.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 3.00 13000.00 13846.75 12960.00 IM0252-388 I-25 LARKSPUR INTERCHANGE NOR 03/08/07 2.00 7500.00 8010.58 8760.00 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 3.00 6000.00 4481.88 4600.00 STA0091-030 SH 9 BETWEEN FAIRPLAY AND ALM 03/22/07 2.00 6000.00 10428.00 12750.00 IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 4.00 6000.00 7791.83 9385.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 53.00 6148.53 6267.29 6525.85 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 2.00 5541.73 7435.52 7400.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 473 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80355 Port Mesg Panel Each =================================================== NH 030A-025 SH30 (HAVANA)- PARKER TO FLOR 04/19/07 2.00 6000.00 3183.66 2700.00 NH 0405-025 KIT CARSON BRIDGE 04/26/07 2.00 4528.58 12944.35 14000.00 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 2.00 5000.00 7252.50 6660.00 STA0712-015 SH 71: NEBRASKA STATE LINE SO 05/10/07 2.00 3000.00 2750.00 2500.00 STA0631-009 SH 63 IN WASHINGTON COUNTY 05/10/07 2.00 3000.00 2750.00 3000.00 STA0343-029 ON US 34 EAST OF YUMA IN YUMA 05/10/07 2.00 3000.00 2750.00 3000.00 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 4.00 6500.00 9245.72 9278.50 STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 2.00 5523.88 10855.00 8280.00 SHE0761-193 I-76: SHERIDAN TO I-25 (M.P. 05/17/07 2.00 5000.00 4074.84 3174.20 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 8.00 7500.00 9020.26 3020.03 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 2.00 250.00 4096.27 2313.00 NH 3851-016 US 385 NORTH OF BURLINGTON 05/24/07 2.00 3500.00 9966.67 6900.00 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 3.00 5000.00 4400.00 5000.00 CR400-216 SIGNALS @ US34 & SH37, KERSEY 05/24/07 2.00 3000.00 3700.00 3210.00 IM 0253-196 I-25: 48TH AVE TO US 36 225: 05/31/07 5.00 6000.00 12100.00 11200.00 IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 2.00 5500.00 9500.00 9000.00 NH0341-071 US 34: GARFIELD TO MORNING DR 06/14/07 10.00 4500.00 5666.67 5500.00 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 2.00 5000.00 7066.67 5200.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 4.00 10000.00 7079.31 6300.00 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 2.00 4528.58 5445.71 4893.95 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 2.00 5000.00 10986.67 8500.00 CR600-285 VARIOUS LOCATIONS IN REGION 6 06/28/07 2.00 6000.00 4516.67 4800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 68.00 5334.49 7313.82 5934.36 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 2.00 7000.00 7475.70 5500.00 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 4.00 4500.00 4550.73 4500.00 SHE 0702-267 NEAR VAIL IN EAGLE COUNTY 08/02/07 2.00 7600.00 6795.00 5555.00 BR 0253-192 I-25&128TH 08/16/07 6.00 6000.00 5388.33 8200.00 CR100-126 WEST OF KIT CARSON 08/16/07 2.00 9186.80 8540.98 6300.00 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 2.00 6500.00 6805.56 7500.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 2.00 18000.00 15452.38 15384.50 IM0703-323 GEORGETOWN HILL CHUTE 2 AND 3 08/30/07 1.00 3452.35 6709.80 5237.20 IM R400-215 I-25 & I-76 VMS INSTALLATION 09/06/07 4.00 6500.00 945.80 109.00 IM 0703-331 WB I-70 AT M.P. 259.70 AND M. 09/06/07 1.00 6000.00 3920.51 2207.03 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 2.00 8000.00 6216.67 5900.00 C R600 - 300 VARIOUS LOCATIONS IN REGION 6 09/27/07 2.00 6000.00 7919.44 5895.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 30.00 7134.20 5980.90 5971.64 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 4.00 5500.00 2514.82 1900.00 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 2.00 8000.00 5012.50 3000.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 474 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80355 Port Mesg Panel Each =================================================== IM 0703-336 WB I-70 AT M.P. 259.70 AND M. 10/18/07 1.00 5360.00 3542.50 3270.00 C 0504-055 PUEBLO COUNTY, US-50C AT SALT 11/01/07 2.00 7700.00 1200.00 1300.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 2.00 8524.00 2622.19 2900.00 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 2.00 5000.00 5453.68 4662.68 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 4.00 4000.00 8023.52 2600.00 STSR400-229 SH 14, SH 93, & SH 157 IN BOU 12/06/07 8.00 4500.00 4757.40 1057.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 2.00 5000.00 8566.21 10000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 27.00 5474.37 4619.54 2720.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 178.00 5901.41 6201.63 5629.25 =============== 630-80356 Flash Arrow Panel (A Ty) Each =================================================== NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 2.00 1500.00 3461.67 3240.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1500.00 3461.67 3240.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 2.00 1010.00 401.25 450.00 CC 0821-084 SH82 ASPEN 12/20/07 2.00 1350.00 1418.33 1320.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 1180.00 837.14 885.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 1286.67 1300.29 1670.00 =============== 630-80357 Flash Arrow Panel (B Ty) Each =================================================== STA 086A-045 SH 86 - FRANKTOWN TO ELBERT C 02/01/07 2.00 800.00 1116.30 556.50 NH 0062-023 SH 6, CLEAR CREEK CANYON 02/08/07 1.00 1000.00 670.00 555.00 NH 1602-102 WITHIN THE ALAMOSA CITY LIMIT 02/15/07 2.00 600.00 1442.50 385.00 SHE 1151-020 SH 115 VMS, MP 17 AND MP 41 02/15/07 1.00 700.00 992.69 427.14 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 2.00 1500.00 1420.63 1700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 937.50 1181.88 783.14 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 2.00 666.47 1238.84 1300.00 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 1.00 600.00 693.33 650.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 644.31 1142.58 1083.33 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 475 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80357 Flash Arrow Panel (B Ty) Each =================================================== SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 2.00 1000.00 300.00 300.00 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 2.00 700.00 557.03 550.00 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 1.00 800.00 1277.78 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 840.00 623.28 740.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 852.06 1065.60 825.95 =============== 630-80358 Flash Arrow Panel (C Ty) Each =================================================== STA 0961-012 SH 96, OVERLAY IN PUEBLO 01/04/07 3.00 1250.00 418.00 290.00 IM 0702-269 I 70 IN EAGLE COUNTY 01/11/07 2.00 1300.00 1050.00 1750.00 IM 0702-270 I 70 THROUGH GLENWOOD CANYON 01/11/07 2.00 1300.00 412.50 470.00 STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 2.00 1300.00 333.83 110.00 NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 4.00 1200.00 1153.13 1700.00 BR 109A-018 SH 109 LA JUNTA, SH50, MANZI 01/11/07 4.00 500.00 931.38 1017.75 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 15.00 1400.00 1135.00 1300.00 NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 2.00 1200.00 1191.67 880.00 SHE 0931-027 SH 93 @ SH 72 01/25/07 2.00 1000.00 612.60 525.00 IM 0253-194 ON I-25 IN WELD COUNTY 01/25/07 2.00 1500.00 2750.00 3000.00 NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 2.00 1100.00 832.50 832.50 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 2.00 1200.00 1047.06 725.00 IM0252-388 I-25 LARKSPUR INTERCHANGE NOR 03/08/07 2.00 1000.00 1361.98 985.50 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 4.00 1250.00 469.06 295.00 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 2.00 1000.00 1200.00 1100.00 IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 6.00 1200.00 1164.74 1045.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 56.00 1206.25 963.57 1061.55 NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 2.00 1300.00 3040.00 2160.00 NH 030A-025 SH30 (HAVANA)- PARKER TO FLOR 04/19/07 4.00 1200.00 580.90 530.00 SHE 0251-175 ALONG I 25 NORTH OF THE CITY 04/26/07 2.00 650.00 1401.33 2100.00 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 2.00 1000.00 1291.25 1665.00 SHE0761-193 I-76: SHERIDAN TO I-25 (M.P. 05/17/07 2.00 1200.00 1072.65 423.25 IM0703-317 FROM MP 221.30 TO MP 251.30 J 05/17/07 3.00 1151.60 1233.33 1200.00 STA 0703-312 I-70 HIDDEN VALLEY AND FALL R 05/17/07 2.00 957.49 430.00 430.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 8.00 1300.00 1073.29 855.67 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 2.00 1500.00 866.12 1099.00 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 2.00 2000.00 1500.00 1500.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 476 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80358 Flash Arrow Panel (C Ty) Each =================================================== CR400-216 SIGNALS @ US34 & SH37, KERSEY 05/24/07 2.00 1000.00 540.00 430.00 IM 0253-196 I-25: 48TH AVE TO US 36 225: 05/31/07 6.00 1500.00 2415.00 2240.00 IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 2.00 1150.00 1600.00 1700.00 NH0341-071 US 34: GARFIELD TO MORNING DR 06/14/07 4.00 1000.00 1591.67 1000.00 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 2.00 900.00 1137.25 1450.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 6.00 4000.00 3251.91 3000.00 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 4.00 952.65 1040.12 815.66 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 4.00 1000.00 1477.67 1500.00 ITSSW00-378 VMS REPLACEMENT IN REGIONS 1, 06/21/07 2.00 800.00 1121.72 1088.15 CR600-285 VARIOUS LOCATIONS IN REGION 6 06/28/07 2.00 1100.00 1130.00 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 63.00 1437.78 1504.44 1393.00 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 4.00 2000.00 1243.46 2477.36 SHE 0702-267 NEAR VAIL IN EAGLE COUNTY 08/02/07 2.00 1230.00 2021.00 1555.00 ITS SW00-457 DRCOG REGION 08/09/07 1.00 800.00 857.50 1575.00 C0702-273 I-70 GLENWOOD CANYON 08/09/07 2.00 1250.00 4000.00 4000.00 BR 0253-192 I-25&128TH 08/16/07 4.00 1200.00 1351.19 1500.00 C0701-190 26.5 ROAD/I-70 BRIDGE REPAIR 08/27/07 2.00 770.00 845.17 770.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 2.00 3500.00 310.00 307.50 IM0703-323 GEORGETOWN HILL CHUTE 2 AND 3 08/30/07 1.00 1258.35 3388.72 2094.88 ITSSW00-455 VMS REPLACEMENT IN REGIONS 1, 08/30/07 2.00 1100.00 6130.00 6510.00 C0701-187 I-70 20 ROAD BRIDGE REPAIR 09/06/07 4.00 750.00 772.40 845.00 IM 0703-331 WB I-70 AT M.P. 259.70 AND M. 09/06/07 1.00 1100.00 1110.88 1103.52 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 2.00 1800.00 2883.75 2600.00 C R600 - 300 VARIOUS LOCATIONS IN REGION 6 09/27/07 4.00 1500.00 1234.15 1070.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 31.00 1427.69 1500.07 1929.93 BR R300-130 I-70 (VARIOUS LOCATIONS) 10/18/07 4.00 2000.00 55.67 55.00 IM 0703-336 WB I-70 AT M.P. 259.70 AND M. 10/18/07 1.00 1295.25 1396.88 610.00 STA 340A-013 SH 340 IN FRUITA 10/25/07 2.00 1300.00 1217.50 565.00 C 0504-055 PUEBLO COUNTY, US-50C AT SALT 11/01/07 1.00 1250.00 143.33 200.00 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 2.00 1500.00 729.95 504.62 SHE 082A-010 SH 82 AND BUFFALO VALLEY ROAD 11/29/07 2.00 1250.00 1445.00 1170.00 C0703-338 CLEAR CREEK COUNTY 12/05/07 1.00 500.00 506.67 190.00 STSR400-229 SH 14, SH 93, & SH 157 IN BOU 12/06/07 4.00 800.00 1086.90 542.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 4.00 1100.00 2209.45 3500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 21.00 1273.58 1192.60 1041.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 171.00 1339.96 1267.24 1338.60 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 477 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80359 Port Mesg Panel Day ==================================================== HB 0063-021 US 6: RIFLE TO NEW CASTLE 01/04/07 120.00 110.00 126.50 165.00 NH 0501-054 US 50 IN GUNNISON COUNTY 01/04/07 40.00 150.00 141.67 200.00 IM 0702-270 I 70 THROUGH GLENWOOD CANYON 01/11/07 300.00 110.00 58.17 67.00 STA 086A-045 SH 86 - FRANKTOWN TO ELBERT C 02/01/07 180.00 115.00 102.06 111.30 NH 0062-023 SH 6, CLEAR CREEK CANYON 02/08/07 232.00 95.00 91.47 66.00 HB 065A-019 SH 65 THRU CEDAREDGE 03/08/07 100.00 120.00 92.83 95.00 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 180.00 125.00 150.00 210.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,152.00 112.36 99.83 113.32 NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 200.00 120.00 92.50 54.00 STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 100.00 109.98 91.93 64.90 IM0703-317 FROM MP 221.30 TO MP 251.30 J 05/17/07 180.00 102.26 166.67 150.00 STA 0703-312 I-70 HIDDEN VALLEY AND FALL R 05/17/07 4.00 187.50 290.00 290.00 BR 059A-032 ON SH 59 IN SEDGWICK COUNTY 06/07/07 56.00 150.00 114.37 65.00 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 220.00 110.00 67.87 56.50 ITSSW00-378 VMS REPLACEMENT IN REGIONS 1, 06/21/07 120.00 80.00 102.93 108.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 880.00 109.49 96.36 84.75 ITS SW00-457 DRCOG REGION 08/09/07 15.00 250.00 189.88 99.75 C0701-190 26.5 ROAD/I-70 BRIDGE REPAIR 08/27/07 30.00 77.00 86.17 77.00 IM0703-323 GEORGETOWN HILL CHUTE 2 AND 3 08/30/07 12.00 157.02 213.81 115.22 ITSSW00-455 VMS REPLACEMENT IN REGIONS 1, 08/30/07 120.00 110.00 265.00 300.00 C0701-187 I-70 20 ROAD BRIDGE REPAIR 09/06/07 200.00 150.00 41.70 46.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 500.00 48.00 50.25 46.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 877.00 85.68 67.35 83.68 BR R300-130 I-70 (VARIOUS LOCATIONS) 10/18/07 20.00 150.00 111.67 110.00 SHE0092-019 SH 9 NORTH OF SILVERTHORNE, I 10/18/07 40.00 166.50 144.55 141.75 STA 340A-013 SH 340 IN FRUITA 10/25/07 200.00 110.00 76.88 68.00 C120A-007 ON SH 120 AT PORTLAND OVER TH 11/29/07 84.00 110.00 73.75 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 344.00 118.90 87.31 80.73 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,253.00 105.08 89.75 94.15 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 478 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80360 Drum Channel Dev Each =================================================== HB 0063-021 US 6: RIFLE TO NEW CASTLE 01/04/07 100.00 45.00 36.50 27.00 IM 0702-269 I 70 IN EAGLE COUNTY 01/11/07 75.00 45.00 25.50 29.00 IM 0702-270 I 70 THROUGH GLENWOOD CANYON 01/11/07 143.00 45.00 34.50 40.00 STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 150.00 40.00 27.72 21.50 NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 250.00 45.00 30.25 27.00 BR 109A-018 SH 109 LA JUNTA, SH50, MANZI 01/11/07 210.00 35.00 46.88 45.75 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 160.00 40.00 37.90 35.00 NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 35.00 45.00 26.47 14.30 SHE 0931-027 SH 93 @ SH 72 01/25/07 50.00 45.00 19.78 14.00 IM 0253-194 ON I-25 IN WELD COUNTY 01/25/07 40.00 45.00 57.00 56.00 NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 50.00 40.00 27.75 27.75 STA 0661-009 ON SH 66 IN WELD COUNTY 02/01/07 25.00 35.00 42.08 33.00 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 100.00 45.00 42.81 58.00 STA 086A-045 SH 86 - FRANKTOWN TO ELBERT C 02/01/07 56.00 40.00 41.79 38.95 STA 1251-005 SH 125 AND 127 NORTH OF COWDR 02/08/07 100.00 60.00 46.83 42.00 NH 0402-070 US 40 ROUTT COUNTY 02/08/07 10.00 45.00 39.00 48.00 NH 0062-023 SH 6, CLEAR CREEK CANYON 02/08/07 150.00 40.00 34.48 27.60 HB 149A-023 SOUTH FORK TO CREEDE - SHOULD 02/08/07 20.00 25.00 18.50 22.00 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 100.00 45.00 33.51 20.65 NH 1602-102 WITHIN THE ALAMOSA CITY LIMIT 02/15/07 100.00 25.00 61.50 33.00 SHE 1151-020 SH 115 VMS, MP 17 AND MP 41 02/15/07 70.00 40.00 25.53 26.70 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 250.00 85.00 17.23 16.20 SHE 5502-054 02/22/07 34.00 80.00 53.21 75.00 IM0252-388 I-25 LARKSPUR INTERCHANGE NOR 03/08/07 50.00 45.00 47.95 27.40 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 56.00 45.00 43.84 52.00 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 200.00 35.00 27.04 17.70 SHE 1151-018 SH 115 - GUMAER AVENUE EAST 03/08/07 40.00 35.00 37.30 30.00 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 50.00 40.00 58.05 60.00 HB 065A-019 SH 65 THRU CEDAREDGE 03/08/07 10.00 45.00 36.17 28.00 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 100.00 50.00 29.00 25.00 STA0091-030 SH 9 BETWEEN FAIRPLAY AND ALM 03/22/07 50.00 50.00 35.50 30.00 IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 200.00 45.00 40.20 36.50 SHE 0504-050 INTERSECTION OF SH 50B AND SH 03/22/07 120.00 40.00 25.04 44.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,154.00 45.72 34.42 32.15 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 300.00 30.36 36.17 27.00 NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 500.00 45.00 40.75 27.00 NH 030A-025 SH30 (HAVANA)- PARKER TO FLOR 04/19/07 75.00 45.00 29.17 26.00 NH 0405-025 KIT CARSON BRIDGE 04/26/07 100.00 28.23 63.84 50.00 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 430.00 20.00 13.80 13.00 SHE 0251-175 ALONG I 25 NORTH OF THE CITY 04/26/07 100.00 35.00 30.49 3.15 STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 80.00 37.43 33.50 30.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 479 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80360 Drum Channel Dev Each =================================================== SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 80.00 40.00 43.75 55.50 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 150.00 40.00 67.83 67.00 STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 300.00 33.39 23.73 36.25 SHE0761-193 I-76: SHERIDAN TO I-25 (M.P. 05/17/07 150.00 45.00 25.66 26.45 IM0703-317 FROM MP 221.30 TO MP 251.30 J 05/17/07 100.00 30.48 44.67 40.00 STA 0703-312 I-70 HIDDEN VALLEY AND FALL R 05/17/07 10.00 30.55 29.00 29.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 1,000.00 50.00 36.67 25.16 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 250.00 45.00 26.22 23.00 NH 3851-016 US 385 NORTH OF BURLINGTON 05/24/07 28.00 38.62 57.00 36.00 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 100.00 50.00 52.50 75.00 IM 0253-196 I-25: 48TH AVE TO US 36 225: 05/31/07 100.00 45.00 60.50 56.00 STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 250.00 40.00 39.92 35.00 BR 059A-032 ON SH 59 IN SEDGWICK COUNTY 06/07/07 8.00 50.00 60.18 75.00 IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 300.00 30.00 57.50 55.00 NH0341-071 US 34: GARFIELD TO MORNING DR 06/14/07 150.00 40.00 26.33 18.00 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 50.00 30.00 44.65 50.00 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 90.00 50.00 30.00 23.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 300.00 50.00 38.95 35.00 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 100.00 31.43 30.36 27.19 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 350.00 45.00 48.50 48.00 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 10.00 60.00 34.54 53.01 ITSSW00-378 VMS REPLACEMENT IN REGIONS 1, 06/21/07 100.00 35.00 52.77 56.30 CR600-285 VARIOUS LOCATIONS IN REGION 6 06/28/07 100.00 34.00 35.33 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,661.00 40.07 37.70 33.53 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 400.00 50.00 29.34 40.02 BRR500-087 US 160 PAGOSA SPRINGS 07/12/07 30.00 40.00 22.00 22.00 SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 50.00 60.00 19.00 19.00 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 150.00 40.00 44.15 44.00 C065A-020 SH65 GRAND MESA SLIDE REPAIR 07/26/07 20.00 35.00 30.00 30.00 SHE 0702-267 NEAR VAIL IN EAGLE COUNTY 08/02/07 50.00 35.95 56.00 55.00 NH 5502-055 COALBANK PASS 08/09/07 30.00 35.00 11.25 11.50 ITS SW00-457 DRCOG REGION 08/09/07 30.00 45.00 19.25 10.50 C0702-273 I-70 GLENWOOD CANYON 08/09/07 64.00 45.00 35.00 35.00 BR 0253-192 I-25&128TH 08/16/07 500.00 45.00 32.43 47.00 CR100-126 WEST OF KIT CARSON 08/16/07 500.00 38.95 50.01 50.00 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 100.00 35.00 26.95 45.00 C0701-190 26.5 ROAD/I-70 BRIDGE REPAIR 08/27/07 50.00 20.00 23.50 20.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 750.00 40.00 7.67 7.50 IM0703-323 GEORGETOWN HILL CHUTE 2 AND 3 08/30/07 40.00 47.45 25.98 31.42 ITSSW00-455 VMS REPLACEMENT IN REGIONS 1, 08/30/07 100.00 60.00 130.00 155.00 C0701-187 I-70 20 ROAD BRIDGE REPAIR 09/06/07 20.00 55.00 23.48 26.00 IM 0703-331 WB I-70 AT M.P. 259.70 AND M. 09/06/07 100.00 45.00 53.30 55.18 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 30.00 35.00 44.75 42.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 480 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80360 Drum Channel Dev Each =================================================== STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 91.00 28.00 39.38 36.00 C R600 - 300 VARIOUS LOCATIONS IN REGION 6 09/27/07 100.00 75.00 35.29 27.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,205.00 43.38 31.79 37.48 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 125.00 45.00 19.88 21.00 BR R300-130 I-70 (VARIOUS LOCATIONS) 10/18/07 20.00 60.00 41.33 39.00 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 15.00 40.00 26.25 20.00 SHE0092-019 SH 9 NORTH OF SILVERTHORNE, I 10/18/07 50.00 33.25 31.80 42.00 IM 0703-336 WB I-70 AT M.P. 259.70 AND M. 10/18/07 20.00 34.75 31.44 45.00 STA 340A-013 SH 340 IN FRUITA 10/25/07 60.00 45.00 30.04 33.00 C 0504-055 PUEBLO COUNTY, US-50C AT SALT 11/01/07 50.00 35.00 18.67 20.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 210.00 47.50 32.03 33.00 BR 0241-047 US 24, 2 MI S OF GRANITE, CHA 11/15/07 20.00 75.00 63.71 50.74 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 100.00 45.00 43.91 40.37 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 30.00 35.00 37.38 26.00 SHE 082A-010 SH 82 AND BUFFALO VALLEY ROAD 11/29/07 50.00 45.00 29.13 12.00 C120A-007 ON SH 120 AT PORTLAND OVER TH 11/29/07 25.00 35.00 36.00 35.00 C0703-338 CLEAR CREEK COUNTY 12/05/07 30.00 25.00 35.67 25.00 STSR400-229 SH 14, SH 93, & SH 157 IN BOU 12/06/07 100.00 40.00 47.48 49.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 350.00 45.00 44.76 25.00 CC 0821-084 SH82 ASPEN 12/20/07 200.00 36.00 24.75 22.00 SHE 160A-009 U.S. 160 MP 94.15 - MP 96.63 12/20/07 30.00 42.00 39.43 11.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,485.00 42.65 34.41 29.01 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13,505.00 42.46 35.03 33.65 =============== 630-80363 Drum Channel Dev (Light) (F) Each =================================================== HB 0063-021 US 6: RIFLE TO NEW CASTLE 01/04/07 25.00 55.00 44.83 34.00 STA 0961-012 SH 96, OVERLAY IN PUEBLO 01/04/07 5.00 60.00 27.02 23.10 IM 0702-270 I 70 THROUGH GLENWOOD CANYON 01/11/07 25.00 65.00 40.25 47.00 STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 20.00 50.00 30.75 24.00 BR 109A-018 SH 109 LA JUNTA, SH50, MANZI 01/11/07 12.00 40.00 68.25 81.50 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 60.00 55.00 50.40 35.00 NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 4.00 55.00 48.40 14.30 IM 0253-194 ON I-25 IN WELD COUNTY 01/25/07 8.00 55.00 708.33 2000.00 STA 0661-009 ON SH 66 IN WELD COUNTY 02/01/07 2.00 40.00 62.62 55.00 STA 086A-045 SH 86 - FRANKTOWN TO ELBERT C 02/01/07 12.00 45.00 56.93 55.65 STA 1251-005 SH 125 AND 127 NORTH OF COWDR 02/08/07 10.00 60.00 54.57 50.00 NH 0402-070 US 40 ROUTT COUNTY 02/08/07 10.00 65.00 65.00 95.00 HB 149A-023 SOUTH FORK TO CREEDE - SHOULD 02/08/07 10.00 30.00 29.67 44.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 481 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80363 Drum Channel Dev (Light) (F) Each =================================================== NH 1602-102 WITHIN THE ALAMOSA CITY LIMIT 02/15/07 10.00 60.00 91.50 33.00 IM0252-388 I-25 LARKSPUR INTERCHANGE NOR 03/08/07 6.00 50.00 63.90 65.70 HB 065A-019 SH 65 THRU CEDAREDGE 03/08/07 10.00 50.00 40.67 35.00 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 20.00 55.00 36.80 32.40 STA0091-030 SH 9 BETWEEN FAIRPLAY AND ALM 03/22/07 6.00 60.00 67.59 70.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 255.00 54.00 61.60 104.18 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 12.00 45.04 70.51 64.00 NH 0405-025 KIT CARSON BRIDGE 04/26/07 6.00 40.03 70.87 65.00 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 20.00 25.00 20.87 20.00 STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 20.00 45.16 45.10 35.00 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 10.00 50.00 57.38 55.50 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 12.00 50.00 105.66 103.00 STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 12.00 52.77 39.40 62.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 40.00 55.00 82.67 100.66 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 20.00 55.00 76.67 115.50 NH 3851-016 US 385 NORTH OF BURLINGTON 05/24/07 6.00 45.03 67.00 41.00 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 10.00 80.00 70.00 110.00 BR 059A-032 ON SH 59 IN SEDGWICK COUNTY 06/07/07 6.00 55.00 69.70 85.00 NH0341-071 US 34: GARFIELD TO MORNING DR 06/14/07 10.00 45.00 37.67 18.00 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 7.00 55.00 47.33 35.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 24.00 80.00 59.32 50.00 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 30.00 55.87 36.66 32.63 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 10.00 60.00 39.58 81.26 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 255.00 53.52 60.70 64.32 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 50.00 60.00 36.34 67.52 BRR500-087 US 160 PAGOSA SPRINGS 07/12/07 10.00 50.00 25.00 28.00 C065A-020 SH65 GRAND MESA SLIDE REPAIR 07/26/07 4.00 40.00 33.33 35.00 NH 5502-055 COALBANK PASS 08/09/07 10.00 45.00 17.13 17.25 BR 0253-192 I-25&128TH 08/16/07 20.00 55.00 40.17 55.00 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 5.00 50.00 61.11 100.00 C0701-190 26.5 ROAD/I-70 BRIDGE REPAIR 08/27/07 6.00 26.00 27.17 26.00 C0701-187 I-70 20 ROAD BRIDGE REPAIR 09/06/07 4.00 65.00 23.60 26.00 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 4.00 50.00 50.67 48.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 8.00 28.00 39.63 36.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 121.00 52.07 36.09 52.14 BR R300-130 I-70 (VARIOUS LOCATIONS) 10/18/07 10.00 65.00 44.67 44.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 482 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80363 Drum Channel Dev (Light) (F) Each =================================================== STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 5.00 60.00 31.50 25.00 STA 340A-013 SH 340 IN FRUITA 10/25/07 12.00 65.00 33.54 40.00 BR 0241-047 US 24, 2 MI S OF GRANITE, CHA 11/15/07 2.00 65.00 53.03 59.20 C120A-007 ON SH 120 AT PORTLAND OVER TH 11/29/07 10.00 50.00 43.50 40.00 CC 0821-084 SH82 ASPEN 12/20/07 20.00 46.00 25.58 22.00 SHE 160A-009 U.S. 160 MP 94.15 - MP 96.63 12/20/07 2.00 54.00 111.51 17.54 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 61.00 55.54 35.92 33.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 692.00 53.62 53.87 74.15 =============== 630-80364 Drum Channel Dev (Light) (SB) Each =================================================== STA 0961-012 SH 96, OVERLAY IN PUEBLO 01/04/07 150.00 60.00 28.46 32.30 IM 0702-269 I 70 IN EAGLE COUNTY 01/11/07 5.00 45.00 32.00 35.00 STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 20.00 45.00 32.47 25.00 STA 1251-005 SH 125 AND 127 NORTH OF COWDR 02/08/07 20.00 60.00 65.80 50.00 NH 0402-070 US 40 ROUTT COUNTY 02/08/07 10.00 70.00 70.00 105.00 SHE 5502-054 02/22/07 6.00 50.00 67.92 90.00 SHE 1151-018 SH 115 - GUMAER AVENUE EAST 03/08/07 20.00 45.00 50.49 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 231.00 57.25 36.87 38.14 NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 50.00 50.00 48.25 27.00 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 20.00 60.00 42.15 81.26 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 70.00 52.86 45.74 42.50 C065A-020 SH65 GRAND MESA SLIDE REPAIR 07/26/07 12.00 45.00 40.00 40.00 C0702-273 I-70 GLENWOOD CANYON 08/09/07 26.00 51.00 35.00 35.00 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 5.00 50.00 61.11 100.00 C0701-190 26.5 ROAD/I-70 BRIDGE REPAIR 08/27/07 12.00 31.00 30.50 31.00 IM0703-323 GEORGETOWN HILL CHUTE 2 AND 3 08/30/07 10.00 54.24 36.34 62.85 C0701-187 I-70 20 ROAD BRIDGE REPAIR 09/06/07 10.00 60.00 23.70 26.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 15.00 28.00 39.88 36.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 90.00 45.00 35.23 41.01 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 6.00 40.00 31.75 25.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 483 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80364 Drum Channel Dev (Light) (SB) Each =================================================== STA 340A-013 SH 340 IN FRUITA 10/25/07 12.00 60.00 36.54 45.00 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 20.00 45.00 38.38 26.00 C0703-338 CLEAR CREEK COUNTY 12/05/07 15.00 15.00 54.33 32.00 SHE 160A-009 U.S. 160 MP 94.15 - MP 96.63 12/20/07 8.00 60.00 61.39 17.54 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 61.00 42.05 43.04 30.01 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 452.00 52.08 38.93 38.29 =============== 630-80365 Port Mesg Panel (State Furn) Each =================================================== NH 5502-055 COALBANK PASS 08/09/07 2.00 1000.00 700.00 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 1000.00 700.00 1000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1000.00 700.00 1000.00 =============== 630-80366 Port Traf Speed Monitor (State Purch) Each =================================================== CR100-126 WEST OF KIT CARSON 08/16/07 2.00 34528.80 40496.47 40000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 34528.80 40496.47 40000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 34528.80 40496.47 40000.00 =============== 630-80367 Port Traf Speed Monitor Each =================================================== NH 0405-025 KIT CARSON BRIDGE 04/26/07 2.00 4116.93 6374.29 7000.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 4.00 5000.00 11625.81 13086.74 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 2.00 5000.00 3509.19 3000.00 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 2.00 4116.93 6618.63 4350.18 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 4646.77 7887.31 8104.73 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 1.00 5000.00 6106.20 5550.81 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 5000.00 6106.20 5550.81 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 4678.88 7632.87 7872.56 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 484 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80370 Conc Barrier (Temp) Lin Foot =============================================== BR 109A-018 SH 109 LA JUNTA, SH50, MANZI 01/11/07 1,500.00 35.00 36.13 46.25 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 1,500.00 19.00 35.70 40.00 NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 400.00 35.00 32.25 32.25 HB 149A-023 SOUTH FORK TO CREEDE - SHOULD 02/08/07 200.00 50.00 56.67 11.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 1,460.00 32.00 58.17 20.77 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 300.00 35.00 38.00 35.00 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 500.00 30.00 53.33 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,860.00 30.24 43.08 34.61 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 500.00 28.75 41.12 48.00 NH 0405-025 KIT CARSON BRIDGE 04/26/07 400.00 38.63 49.51 65.00 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 1,320.00 30.00 31.71 38.85 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 850.00 25.00 36.72 52.50 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 39,400.00 22.00 21.11 18.43 NH 3851-016 US 385 NORTH OF BURLINGTON 05/24/07 160.00 42.01 37.33 32.00 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 1,030.00 32.00 25.00 15.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 480.00 30.00 31.51 30.00 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 100.00 32.00 34.33 37.00 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 1,050.00 25.00 44.94 56.84 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 45,290.00 22.99 23.63 21.43 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 2,500.00 30.00 41.62 33.42 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 700.00 30.00 28.20 25.00 C065A-020 SH65 GRAND MESA SLIDE REPAIR 07/26/07 400.00 60.00 40.67 32.00 C0702-273 I-70 GLENWOOD CANYON 08/09/07 2,320.00 30.00 25.00 25.00 BR 0253-192 I-25&128TH 08/16/07 2,400.00 32.00 30.23 22.00 CR100-126 WEST OF KIT CARSON 08/16/07 1,000.00 33.74 25.78 34.00 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 300.00 50.00 61.25 75.00 C0701-190 26.5 ROAD/I-70 BRIDGE REPAIR 08/27/07 50.00 11.00 35.33 11.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 1,825.00 30.00 37.06 30.50 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 800.00 40.00 38.92 41.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 1,800.00 30.00 53.63 36.00 C R600 - 300 VARIOUS LOCATIONS IN REGION 6 09/27/07 500.00 45.00 82.60 122.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 14,595.00 32.82 39.61 33.98 STA 340A-013 SH 340 IN FRUITA 10/25/07 700.00 25.00 56.44 86.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 485 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80370 Conc Barrier (Temp) Lin Foot =============================================== C 0504-055 PUEBLO COUNTY, US-50C AT SALT 11/01/07 500.00 26.00 35.00 30.00 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 1,600.00 25.00 30.67 10.00 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 750.00 30.00 54.31 45.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 1,500.00 30.00 33.08 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5,050.00 27.33 37.83 35.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 70,795.00 25.92 29.66 26.08 =============== 630-80375 Inst Conc Barrier (Temp) Lin Foot =============================================== BRR500-087 US 160 PAGOSA SPRINGS 07/12/07 100.00 50.00 27.50 19.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 100.00 50.00 27.50 19.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 100.00 50.00 27.50 19.00 =============== 630-80376 Gdrail Ty 7 (Temp) Lin Foot =============================================== STA 0961-012 SH 96, OVERLAY IN PUEBLO 01/04/07 250.00 25.00 75.48 34.60 IM 0702-269 I 70 IN EAGLE COUNTY 01/11/07 60.00 50.00 343.50 87.00 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 204.00 25.00 41.57 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 514.00 27.92 64.62 36.91 IM0703-317 FROM MP 221.30 TO MP 251.30 J 05/17/07 250.00 25.33 63.33 60.00 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 5,000.00 35.00 35.48 58.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,250.00 34.54 36.06 58.10 C0703-338 CLEAR CREEK COUNTY 12/05/07 200.00 50.00 44.33 32.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 200.00 50.00 44.33 32.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,964.00 34.49 38.64 55.39 =============== 630-80378 Glare Screen (Temp) Lin Foot =============================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 16,400.00 12.00 13.26 19.52 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16,400.00 12.00 13.26 19.52 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 486 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80378 Glare Screen (Temp) Lin Foot =============================================== BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 1,200.00 11.50 14.09 10.71 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,200.00 11.50 14.09 10.71 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17,600.00 11.97 13.35 18.92 =============== 630-80380 Traffic Cone Each =================================================== HB 0063-021 US 6: RIFLE TO NEW CASTLE 01/04/07 250.00 15.00 11.95 8.20 STA 0961-012 SH 96, OVERLAY IN PUEBLO 01/04/07 150.00 11.00 8.95 5.75 NH 0501-054 US 50 IN GUNNISON COUNTY 01/04/07 200.00 15.00 2.42 2.00 STA 109A-017 SH 109, S. OF LA JUNTA 01/04/07 400.00 11.00 13.05 16.00 IM 0702-269 I 70 IN EAGLE COUNTY 01/11/07 1,000.00 12.00 15.00 23.00 IM 0702-270 I 70 THROUGH GLENWOOD CANYON 01/11/07 250.00 15.00 23.00 27.00 STA 096A-038 SH 96, JCT SH 167 TO ORDWAY 01/11/07 300.00 10.00 12.27 11.50 NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 1,000.00 12.00 9.72 7.00 BR 109A-018 SH 109 LA JUNTA, SH50, MANZI 01/11/07 150.00 6.00 15.63 15.25 STA 012A-042 SH 12, S. OF LA VETA 01/18/07 500.00 11.00 7.46 3.25 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 200.00 10.00 10.92 10.00 STA 069A-021 SH 69, W. OF WALSENBURG 01/25/07 500.00 11.00 7.35 9.00 NH 0341-070 ON US 34 IN LARIMER COUNTY 01/25/07 400.00 12.00 11.33 9.00 SHE 0931-027 SH 93 @ SH 72 01/25/07 150.00 10.00 9.10 14.00 IM 0253-194 ON I-25 IN WELD COUNTY 01/25/07 300.00 10.00 18.33 12.00 NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 400.00 12.00 11.00 11.00 STA 0661-009 ON SH 66 IN WELD COUNTY 02/01/07 200.00 12.00 10.55 9.00 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 230.00 10.00 14.00 14.00 STA 086A-045 SH 86 - FRANKTOWN TO ELBERT C 02/01/07 300.00 12.00 11.87 13.35 STA 1251-005 SH 125 AND 127 NORTH OF COWDR 02/08/07 400.00 15.00 11.17 5.50 NH 0402-070 US 40 ROUTT COUNTY 02/08/07 400.00 15.00 11.50 13.00 NH 0062-023 SH 6, CLEAR CREEK CANYON 02/08/07 50.00 12.00 12.66 10.00 HB 149A-023 SOUTH FORK TO CREEDE - SHOULD 02/08/07 30.00 10.00 5.95 6.00 NH 093A-006 SH 93: SH 58 TO 58TH AVE. 02/15/07 500.00 12.00 9.55 7.25 NH 1602-102 WITHIN THE ALAMOSA CITY LIMIT 02/15/07 100.00 20.00 11.65 3.30 SHE 1151-020 SH 115 VMS, MP 17 AND MP 41 02/15/07 45.00 10.00 10.28 8.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 200.00 22.00 11.53 10.80 IM0252-388 I-25 LARKSPUR INTERCHANGE NOR 03/08/07 200.00 12.00 12.17 11.00 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 100.00 12.00 10.49 11.00 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 100.00 10.00 6.41 4.70 SHE 1151-018 SH 115 - GUMAER AVENUE EAST 03/08/07 50.00 10.00 12.95 12.00 STA 089A-011 SH 89, LYCAN TO HOLLY 03/08/07 400.00 11.00 12.35 14.00 HB 065A-019 SH 65 THRU CEDAREDGE 03/08/07 200.00 15.00 8.75 15.00 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 500.00 12.00 16.33 14.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 487 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80380 Traffic Cone Each =================================================== STA0091-030 SH 9 BETWEEN FAIRPLAY AND ALM 03/22/07 300.00 15.00 11.54 9.00 IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 1,000.00 12.00 13.30 11.50 STA402A-007 SH 402 & I-25 OFFRAMS AND E. 03/22/07 100.00 10.00 11.25 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11,555.00 12.25 11.37 11.52 SHE 165A-011 ALONG SH 165 N/O RYE 04/05/07 60.00 10.00 4.91 5.00 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 200.00 10.18 10.42 11.00 NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 1,000.00 10.00 8.88 6.50 NH 030A-025 SH30 (HAVANA)- PARKER TO FLOR 04/19/07 400.00 15.00 9.68 7.50 NH 0405-025 KIT CARSON BRIDGE 04/26/07 200.00 9.73 12.19 15.00 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 300.00 7.00 7.07 7.00 SHE 0251-175 ALONG I 25 NORTH OF THE CITY 04/26/07 500.00 12.00 6.83 1.05 STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 300.00 9.99 8.00 8.50 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 50.00 12.00 13.15 11.10 STA0712-015 SH 71: NEBRASKA STATE LINE SO 05/10/07 500.00 5.00 5.50 1.00 STA0631-009 SH 63 IN WASHINGTON COUNTY 05/10/07 500.00 5.00 5.50 10.00 STA0343-029 ON US 34 EAST OF YUMA IN YUMA 05/10/07 500.00 5.00 5.50 10.00 BR 0711-014 1.0 MILE N. OF PUNKIN CENTER 05/17/07 100.00 12.00 17.90 17.00 STA0831-105 SH 83 NORTH OF EL PASO COUNTY 05/17/07 400.00 11.13 10.78 10.35 SHE0761-193 I-76: SHERIDAN TO I-25 (M.P. 05/17/07 600.00 12.00 8.44 10.60 IM0703-317 FROM MP 221.30 TO MP 251.30 J 05/17/07 500.00 7.30 17.17 15.00 STA 0703-312 I-70 HIDDEN VALLEY AND FALL R 05/17/07 150.00 14.13 9.00 9.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 600.00 12.00 9.39 8.05 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 400.00 12.00 8.34 6.00 NH 3851-016 US 385 NORTH OF BURLINGTON 05/24/07 300.00 11.30 11.10 11.30 SHE 133A-032 SH 133 BETWEEN REDSTONE AND M 05/24/07 100.00 12.00 8.51 7.35 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 250.00 15.00 11.00 15.00 CR400-216 SIGNALS @ US34 & SH37, KERSEY 05/24/07 200.00 12.00 6.20 5.40 IM 0253-196 I-25: 48TH AVE TO US 36 225: 05/31/07 500.00 10.00 15.74 14.56 STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 300.00 10.00 12.33 12.00 BR 059A-032 ON SH 59 IN SEDGWICK COUNTY 06/07/07 30.00 12.00 14.62 25.00 IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 600.00 10.00 15.50 17.00 NH0341-071 US 34: GARFIELD TO MORNING DR 06/14/07 1,000.00 10.00 10.33 9.00 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 100.00 12.00 12.50 13.00 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 14.00 20.00 13.33 10.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 400.00 20.00 14.69 13.00 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 600.00 7.88 8.78 7.61 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 500.00 12.00 14.50 12.50 BR 114A-011 STRUCTURE J-09-G ON SH 114 NE 06/21/07 50.00 12.00 10.26 17.25 ITSSW00-378 VMS REPLACEMENT IN REGIONS 1, 06/21/07 200.00 10.00 11.43 14.30 CR600-285 VARIOUS LOCATIONS IN REGION 6 06/28/07 100.00 8.00 6.67 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12,504.00 10.33 10.22 9.70 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 500.00 15.00 8.08 14.30 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 488 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80380 Traffic Cone Each =================================================== BRR500-087 US 160 PAGOSA SPRINGS 07/12/07 150.00 15.00 5.00 5.00 SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 75.00 12.00 7.00 7.00 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 300.00 12.00 4.87 2.25 C065A-020 SH65 GRAND MESA SLIDE REPAIR 07/26/07 50.00 5.00 18.00 35.00 SHE 0702-267 NEAR VAIL IN EAGLE COUNTY 08/02/07 100.00 10.85 8.74 5.00 NH 5502-055 COALBANK PASS 08/09/07 150.00 8.00 5.88 5.75 ITS SW00-457 DRCOG REGION 08/09/07 200.00 10.00 7.75 10.50 C0702-273 I-70 GLENWOOD CANYON 08/09/07 125.00 10.00 10.00 10.00 BR 0253-192 I-25&128TH 08/16/07 400.00 10.00 8.71 12.00 CR100-126 WEST OF KIT CARSON 08/16/07 300.00 11.26 11.00 10.00 NH 1601-056 US 160 @ ROOSA AVE 08/23/07 200.00 6.00 7.78 10.00 C0701-190 26.5 ROAD/I-70 BRIDGE REPAIR 08/27/07 50.00 10.00 8.67 10.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 250.00 12.00 1.01 1.00 IM0703-323 GEORGETOWN HILL CHUTE 2 AND 3 08/30/07 300.00 11.50 5.69 5.24 ITSSW00-455 VMS REPLACEMENT IN REGIONS 1, 08/30/07 200.00 15.00 15.50 16.00 IM R400-215 I-25 & I-76 VMS INSTALLATION 09/06/07 100.00 12.00 10.95 11.10 C0701-187 I-70 20 ROAD BRIDGE REPAIR 09/06/07 150.00 10.00 5.90 7.00 IM 0703-331 WB I-70 AT M.P. 259.70 AND M. 09/06/07 200.00 10.00 11.26 11.04 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 200.00 5.00 7.63 6.00 C R600 - 300 VARIOUS LOCATIONS IN REGION 6 09/27/07 150.00 10.00 15.03 16.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,150.00 11.03 8.10 9.36 C R400-217 SIGNALS @ SH66 & CR13 10/04/07 150.00 8.00 7.01 6.40 BR R300-130 I-70 (VARIOUS LOCATIONS) 10/18/07 150.00 18.00 11.00 11.00 SHE0092-019 SH 9 NORTH OF SILVERTHORNE, I 10/18/07 250.00 10.50 7.18 10.50 IM 0703-336 WB I-70 AT M.P. 259.70 AND M. 10/18/07 200.00 11.50 9.19 11.00 C 0504-055 PUEBLO COUNTY, US-50C AT SALT 11/01/07 50.00 10.00 4.83 5.00 STA 0091-031 SH 9 NORTH OF BRECKENRIDGE AT 11/15/07 125.00 19.75 5.41 4.50 BR 0241-047 US 24, 2 MI S OF GRANITE, CHA 11/15/07 100.00 15.00 11.85 6.77 BR1192-015 SH 119 IN WELD COUNTY NORTH O 11/29/07 50.00 10.00 11.23 10.09 SHE 082A-010 SH 82 AND BUFFALO VALLEY ROAD 11/29/07 100.00 13.50 14.00 12.00 C0703-338 CLEAR CREEK COUNTY 12/05/07 20.00 15.00 16.67 19.00 STSR400-229 SH 14, SH 93, & SH 157 IN BOU 12/06/07 600.00 8.00 5.47 1.75 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 500.00 12.00 7.18 5.00 CC 0821-084 SH82 ASPEN 12/20/07 150.00 20.00 8.08 5.50 SHE 160A-009 U.S. 160 MP 94.15 - MP 96.63 12/20/07 100.00 10.00 6.38 3.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,545.00 11.88 7.51 6.18 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30,754.00 11.27 10.12 10.05 =============== 630-80390 Channel Dev (Spec) Each =================================================== STA 340A-013 SH 340 IN FRUITA 10/25/07 300.00 12.00 18.76 17.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 300.00 12.00 18.76 17.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 300.00 12.00 18.76 17.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 489 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80391 Channel Dev (Fixed) Each =================================================== BR 109A-018 SH 109 LA JUNTA, SH50, MANZI 01/11/07 225.00 35.00 47.00 51.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 225.00 35.00 47.00 51.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 400.00 100.00 38.78 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 400.00 100.00 38.78 35.00 CR100-126 WEST OF KIT CARSON 08/16/07 300.00 81.27 54.91 38.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 300.00 81.27 54.91 38.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 925.00 78.11 45.87 39.86 =============== 630-80392 Stackable Tubular Marker Each =================================================== IM 0702-270 I 70 THROUGH GLENWOOD CANYON 01/11/07 550.00 25.00 5.97 6.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 550.00 25.00 5.97 6.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 550.00 25.00 5.97 6.65 =============== 630-80401 Delin (Ty I) (Temp) Each =================================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 10.00 20.00 61.50 75.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 20.00 61.50 75.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 20.00 61.50 75.50 =============== 630-80402 Delin (Ty II) (Temp) Each =================================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 53.00 22.00 67.00 75.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 53.00 22.00 67.00 75.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 53.00 22.00 67.00 75.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 490 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80430 Rumble Strip (Port) Each =================================================== NH 0405-025 KIT CARSON BRIDGE 04/26/07 4.00 301.00 1469.62 110.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 9.00 1500.00 1415.99 600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 13.00 1131.08 1432.49 449.23 CR100-126 WEST OF KIT CARSON 08/16/07 16.00 166.13 511.52 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 16.00 166.13 511.52 120.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 29.00 598.69 924.37 267.59 =============== 630-80510 Mobile Pvmt Mkg Zone LUMP SUM =============================================== NH 0501-054 US 50 IN GUNNISON COUNTY 01/04/07 1.00 4000.00 2666.67 4000.00 IM 0253-194 ON I-25 IN WELD COUNTY . 1.00 10000.00 . . NH 0342-044 ON US 34 IN WELD COUNTY 02/01/07 1.00 4500.00 555.00 555.00 STA 0361-082 US 36 IN BOULDER COUNTY 02/01/07 1.00 3000.00 902.50 1200.00 STA 1251-005 SH 125 AND 127 NORTH OF COWDR 02/08/07 1.00 5000.00 4746.67 9500.00 NH 0402-070 US 40 ROUTT COUNTY 02/08/07 1.00 3000.00 2862.50 725.00 SHE 1151-018 SH 115 - GUMAER AVENUE EAST 03/08/07 1.00 1000.00 737.50 625.00 HB 065A-019 SH 65 THRU CEDAREDGE 03/08/07 1.00 5000.00 1628.33 2500.00 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 1.00 4000.00 1933.33 1600.00 SHE 0504-050 INTERSECTION OF SH 50B AND SH 03/22/07 1.00 1000.00 688.43 525.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 4050.00 1853.86 2358.89 NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 1.00 6000.00 457.00 108.00 STA 145A-041 SH 145 - MP 12.6 TO MP16.24 04/26/07 1.00 4000.00 2166.67 1100.00 STA 006A-039 US 6 SAFETY IMPROVEMENTS 04/26/07 1.00 4625.00 1430.00 1150.00 STA0712-015 SH 71: NEBRASKA STATE LINE SO 05/10/07 1.00 3000.00 1254.00 2500.00 STA0631-009 SH 63 IN WASHINGTON COUNTY 05/10/07 1.00 3000.00 1850.00 1200.00 STA0343-029 ON US 34 EAST OF YUMA IN YUMA 05/10/07 1.00 3000.00 1850.00 1200.00 NH 0241-044 INTERSECTION OF US 285 & US 2 05/24/07 1.00 5000.00 800.00 1000.00 STA 0343-027 ON US 34 IN YUMA COUNTY 05/31/07 1.00 2500.00 1855.00 1250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 3890.63 1466.00 1188.50 SHE 0504-054 AT THE INTERSECTION OF SH50C 07/12/07 1.00 2000.00 1600.00 1600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 2000.00 1600.00 1600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19.00 3875.00 1697.22 1796.56 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 491 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80520 Mobile Pvmt Mkg Zone Day ==================================================== NH 1211-065 WADSWORTH BLVD: 65TH AVE. TO 01/11/07 2.00 1000.00 257.50 110.00 IM0252-388 I-25 LARKSPUR INTERCHANGE NOR 03/08/07 7.00 600.00 959.04 1100.00 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 1.00 1500.00 484.63 290.00 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 2.00 1000.00 358.03 295.00 IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 4.00 1000.00 605.73 105.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16.00 856.25 603.46 576.25 SHE 165A-011 ALONG SH 165 N/O RYE 04/05/07 1.00 2200.00 328.38 275.00 NH 030A-025 SH30 (HAVANA)- PARKER TO FLOR 04/19/07 4.00 1000.00 126.35 105.00 SHE 0251-175 ALONG I 25 NORTH OF THE CITY 04/26/07 1.00 2300.00 1149.46 840.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 20.00 2500.00 1355.49 1481.96 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 2.00 1000.00 1283.27 1456.50 IM 0253-196 I-25: 48TH AVE TO US 36 225: 05/31/07 3.00 1500.00 749.00 560.00 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 3.00 1050.00 1420.00 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 34.00 2004.41 1076.33 1078.45 BR 0253-192 I-25&128TH 08/16/07 5.00 1500.00 685.25 105.00 C R600 - 300 VARIOUS LOCATIONS IN REGION 6 09/27/07 2.00 1200.00 1805.22 1575.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7.00 1414.29 1005.24 525.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 57.00 1609.65 910.89 869.51 =============== 630-80560 Mobile Profilograph Oper Zone LUMP SUM =============================================== NH 0501-055 WORK IN THE TOWN OF GUNNISON 04/19/07 1.00 3000.00 7325.00 20000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 3000.00 7325.00 20000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 3000.00 7325.00 20000.00 =============== 630-80570 Mobile Profilograph Oper Zone Day ==================================================== HB 065A-019 SH 65 THRU CEDAREDGE 03/08/07 2.00 1500.00 871.67 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1500.00 871.67 1000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1500.00 871.67 1000.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 492 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-85006 Impact Atten (Sand Fill) (Temp) Each =================================================== IM 0702-270 I 70 THROUGH GLENWOOD CANYON 01/11/07 15.00 4000.00 1716.67 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15.00 4000.00 1716.67 2000.00 HPP 0241-045 SH 24 MP 169.0 TO 174.1 07/12/07 10.00 3000.00 2838.06 1283.59 BRR500-087 US 160 PAGOSA SPRINGS 07/12/07 2.00 2000.00 1978.00 2356.00 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 2.00 3600.00 1676.10 1600.00 C0701-190 26.5 ROAD/I-70 BRIDGE REPAIR 08/27/07 1.00 2600.00 2717.00 2600.00 STA 133A-031 SH 133 IN GARFIELD COUNTY 09/20/07 4.00 4000.00 1723.50 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 19.00 3147.37 2543.76 1439.36 STA 340A-013 SH 340 IN FRUITA 10/25/07 2.00 3625.00 3102.50 2300.00 C0703-338 CLEAR CREEK COUNTY 12/05/07 1.00 3000.00 4671.67 1515.00 CC 0821-084 SH82 ASPEN 12/20/07 1.00 2700.00 2819.58 2392.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 3237.50 3279.56 2126.88 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 38.00 3493.42 2402.56 1733.04 =============== 630-85010 Impact Atten (Temp) Each =================================================== BR 109A-018 SH 109 LA JUNTA, SH50, MANZI 01/11/07 2.00 950.00 3100.00 5000.00 NH 0853-057 US 85 LASALLE TO 22ND ST 01/18/07 2.00 5000.00 6420.00 8000.00 NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 2.00 5000.00 2046.50 1350.00 SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 1.00 4500.00 1543.02 585.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7.00 3771.43 3476.97 4183.57 HB 0852-101 ON US 85, APPROX. 11 MILES S 04/19/07 2.00 4695.13 5042.05 4200.00 SHE 0253-193 ON I-25 & SH 392 IN LARIMER C 04/26/07 1.00 7000.00 8478.50 8214.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 10.00 5000.00 4721.09 2013.36 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 2.00 12500.00 4862.45 2313.00 SHE R400-213 SH 14 AT CR 33 AND SH 52 AT C 06/14/07 2.00 4500.00 4633.33 3400.00 IM0762-044 I-76 EAST OF SEDGWICK 06/14/07 2.00 25000.00 20977.96 20000.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 493 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-85010 Impact Atten (Temp) Each =================================================== STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 2.00 5000.00 4787.00 5800.00 CR600-285 VARIOUS LOCATIONS IN REGION 6 06/28/07 2.00 6000.00 6973.33 7800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 23.00 7495.23 6404.15 5016.24 C0702-273 I-70 GLENWOOD CANYON 08/09/07 2.00 5000.00 5000.00 5000.00 BR 0253-192 I-25&128TH 08/16/07 4.00 4500.00 6857.77 9200.00 BR 0961-008 SH 96 OVER THE ARKANSAS RIVER 08/30/07 4.00 5500.00 3725.38 2051.50 C R600 - 300 VARIOUS LOCATIONS IN REGION 6 09/27/07 2.00 6500.00 6205.00 6485.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.00 5250.00 5600.24 5664.67 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 3.00 4500.00 4321.58 3100.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 4.00 2500.00 4102.23 4000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 7.00 3357.14 4196.23 3614.29 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 49.00 5822.25 5398.94 4855.81 =============== 630-85040 Impact Atten (T-M-A) (Temp) Each =================================================== IM 0702-269 I 70 IN EAGLE COUNTY 01/11/07 2.00 25000.00 19250.00 21000.00 SHE 0931-027 SH 93 @ SH 72 01/25/07 1.00 7000.00 7886.00 6520.00 IM 0253-194 ON I-25 IN WELD COUNTY 01/25/07 2.00 15000.00 68333.33 50000.00 IM0252-388 I-25 LARKSPUR INTERCHANGE NOR 03/08/07 2.00 12000.00 19234.16 11000.00 STU 0831-094 SH 83 PARKER/DARTMOUTH INTERS 03/08/07 1.00 12000.00 12236.88 5500.00 IM 0702-262 I-70, FRISCO TO EJM TUNNEL 03/15/07 1.00 19000.00 19000.00 18000.00 IM 0703-308 I 70; US 40 TO COLFAX 03/22/07 2.00 18000.00 19512.81 15650.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11.00 16181.82 23246.78 20483.64 NH 030A-025 SH30 (HAVANA)- PARKER TO FLOR 04/19/07 1.00 20000.00 12360.81 20000.00 SHE0761-193 I-76: SHERIDAN TO I-25 (M.P. 05/17/07 2.00 10000.00 7678.07 5290.35 IM0703-317 FROM MP 221.30 TO MP 251.30 J 05/17/07 2.00 13167.75 20666.67 20000.00 IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 4.00 15000.00 32424.69 16106.75 BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR 05/24/07 1.00 4000.00 10020.73 9252.50 IM 0253-196 I-25: 48TH AVE TO US 36 225: 05/31/07 5.00 16000.00 28875.00 4200.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 494 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-85040 Impact Atten (T-M-A) (Temp) Each =================================================== IR100-128 I-70 CHAIN STATION PROJECT 06/14/07 2.00 17500.00 45000.00 50000.00 SHE R600-284 SH 121 AT LAYTON & SH 6/2&85 06/14/07 1.00 18500.00 16400.00 18000.00 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 2.00 18393.06 43379.42 47580.06 STU M356-019 FEDERAL BLVD. (SH 287) @ 80TH 06/21/07 1.00 15000.00 26033.33 6300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 21.00 15029.60 25568.37 18320.02 ITS SW00-457 DRCOG REGION 08/09/07 1.00 10000.00 18750.00 21000.00 BR 0253-192 I-25&128TH 08/16/07 2.00 16000.00 23963.71 13500.00 C0701-187 I-70 20 ROAD BRIDGE REPAIR 09/06/07 2.00 13000.00 4153.00 4550.00 IM 0703-331 WB I-70 AT M.P. 259.70 AND M. 09/06/07 1.00 17500.00 16769.10 8276.38 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 14250.00 14836.29 10896.06 IM 0703-336 WB I-70 AT M.P. 259.70 AND M. 10/18/07 1.00 13106.00 9511.25 5445.00 SHE 082A-010 SH 82 AND BUFFALO VALLEY ROAD 11/29/07 1.00 20000.00 7735.00 5265.00 STSR400-229 SH 14, SH 93, & SH 157 IN BOU 12/06/07 2.00 15000.00 16724.40 26317.00 BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 1.00 15000.00 10951.86 9300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 15621.20 12580.84 14528.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 43.00 15284.36 21735.80 17396.76 =============== 630-85041 Impact Atten (T-M-A) Day ==================================================== SHE 0503-066 US50 & PURCELL BLVD IN PUEBLO 03/08/07 14.00 450.00 364.23 324.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 14.00 450.00 364.23 324.00 SHE 0251-175 ALONG I 25 NORTH OF THE CITY 04/26/07 35.00 400.00 518.91 675.00 IM0703-325 OVERLAY ON I-70 MP 252.0 TO 2 06/14/07 10.00 305.00 561.29 587.27 ITSSW00-378 VMS REPLACEMENT IN REGIONS 1, 06/21/07 50.00 600.00 497.72 563.15 CR600-285 VARIOUS LOCATIONS IN REGION 6 06/28/07 10.00 400.00 495.00 550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 105.00 486.19 514.52 601.48 IM0703-323 GEORGETOWN HILL CHUTE 2 AND 3 08/30/07 60.00 577.76 257.37 209.49 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 495 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-85041 Impact Atten (T-M-A) Day ==================================================== ITSSW00-455 VMS REPLACEMENT IN REGIONS 1, 08/30/07 70.00 600.00 392.50 440.00 C R600 - 300 VARIOUS LOCATIONS IN REGION 6 09/27/07 15.00 500.00 531.07 385.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 145.00 580.45 344.07 338.93 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 264.00 536.04 415.92 442.56 =============== 630-86800 Traffic Signal (Temp) LUMP SUM =============================================== NH 1602-099 U.S. 160 THROUGH ALAMOSA 02/22/07 1.00 27000.00 26192.83 22518.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 27000.00 26192.83 22518.00 STA 094A-031 SH 94 AND CURTIS RD. 07/26/07 1.00 20000.00 34908.04 33000.00 C065A-020 SH65 GRAND MESA SLIDE REPAIR 07/26/07 1.00 10000.00 15666.67 12000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 15000.00 27692.53 22500.00 STA 012A-040 BETWEEN WESTON AND PRIMERO ON 10/18/07 1.00 13500.00 1875.00 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 13500.00 1875.00 1000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 17625.00 20507.91 17129.50 =============== 630-86810 Traffic Signal (Temp) Each =================================================== IM 0253-164 ON I-25 IN WELD COUNTY 05/24/07 2.00 21000.00 43229.27 50923.08 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 21000.00 43229.27 50923.08 C 078A-007 SH 78, MILEPOST 13.2, OVER NO 09/07/07 2.00 21000.00 22283.33 15000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 21000.00 22283.33 15000.00 BR0341-069 ON US 34 IN LARIMER COUNTY 11/29/07 1.00 17500.00 44224.04 20400.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:09 Tuesday, March 18, 2008 496 ITEM UNIT COSTS BY PROJECTS -- 2007 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-86810 Traffic Signal (Temp) Each =================================================== CC 0821-084 SH82 ASPEN 12/20/07 2.00 30000.00 25040.00 19800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 25833.33 31434.68 20000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 23071.43 32667.45 27406.59 =============== 630-86820 Traffic signal(Temp.)(State Furnished) Each =================================================== BR 109A-018 SH 109 LA JUNTA, SH50, MANZI 01/11/07 2.00 1000.00 3353.38 6106.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1000.00 3353.38 6106.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1000.00 3353.38 6106.75 =============== 631-00105 Hwy Const LUMP SUM =============================================== C 0702-272 I-70 HLT TRANSITION CEILING S 04/14/07 1.00 1537065.69 1537065.69 1537065.69 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 1537065.69 1537065.69 1537065.69 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1537065.69 1537065.69 1537065.69 =============== 631-10000 Alt Brdg Design and Const LUMP SUM =============================================== BR 0581-006, Alt 1-Def. Bridge SH 58 OVER 44TH AVE. STRUCTUR . 1.00 . 2986674.73 . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 . 2986674.73 . BR 0961-008 SH 96 OVER THE ARKANSAS RIVER . 1.00 . 24856250.00 . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 . 24856250.00 . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 . 17566391.58 . =============== 641-10052 Shotcrete Class 3 Sq Yard ================================================ BR 0581-008 WASHINGTON AVENUE BRIDGE OVER 12/13/07 132.00 100.00 116.55 123.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 132.00 100.00 116.55 123.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 132.00 100.00 116.55 123.00