Colorado Department of Transportation 14:31 Thursday, November 12, 2020 1 2020 Cost Data PROJECTS BID FROM 01/01/20 THROUGH 09/30/20 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20200109 SIMON CONTRACTORS 4 $5,477,794.00 99.11 STA0142-066 SH 14 New Raymer West 4 R 20200109 MARTIN MARIETTA MATERIALS 3 $19,964,032.84 114.09 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA R 4 P 20200109 MOUNTAIN CONSTRUCTORS, INC. 1 $1,871,822.50 122.04 FSA0341-097 US 34 & MACGREGOR INTERSECTION 4 M 20200109 HAMON INFRASTRUCTURE, INC. 3 $1,356,000.00 108.39 FSA0253-262 I-25 SB BOTTLENECK I-76 TO I-7 1 U 20200109 STURGEON ELECTRIC COMPANY, INC 3 $756,000.00 96.02 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND OF 4 R 20200109 SURFACE PREPARATION TECHNOLOGIES 2 $887,234.48 113.49 SHER500-210 R5 FY19 CENTER LINE RUMBLE STR 5 R 20200116 ZAK DIRT, INC. 6 $5,310,755.65 101.62 BR0343-040 US 34 REPUBLICAN RIVER BRIDGES 4 P FBR0343-043 US 34 D-28-P STRUCTURE REPLACE 4 P 20200116 Kilgore Companies, LLC dba Elam Construc 2 $1,359,498.00 90.33 STR131A-038 SH 131 MP 51.95-55.73, ROUTT C 3 M 20200116 MCATEE CONSTRUCTION CO. 2 $3,766,927.45 96.38 STA006A-067 SH 6 Merino to Atwood 4 R 20200123 APC SOUTHERN CONSTRUCTION COMPANY, LLC 2 $7,035,527.04 111.68 NH 0503-093 US50 WEST OF TEXAS CREEK MP 25 2 M 20200123 REDLINE PIPELINE, LLC 2 $7,664,700.70 116.13 PWQM240-172 El Paso County, north Colorado 2 R 20200130 OLDCASTLE SW GROUP, INC. 5 $10,688,093.10 92.40 STR141A-044 SH 141 AND SH 145, FROM SLICKR 5 R 20200130 AMERICAN WEST CONSTRUCTION, LLC 1 $547,985.00 110.70 STR012A-050 CULVERT REPAIR I-25 AND US 350 2 P 20200206 MCATEE CONSTRUCTION CO. 2 $12,072,994.45 114.74 STA059A-036 SH 59 SEIBERT TO COPE 4 P 20200206 BRANNAN SAND AND GRAVEL, LLC 2 $5,223,224.95 108.53 STA0703-443 I-70 EJMT TUNNELS PAVING 1 M 20200206 DILLIE AND KUHN, INC. 5 $3,179,048.10 72.30 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 00 P 20200206 AMERICAN CIVIL CONSTRUCTORS, LLC dba A 2 $7,686,500.00 119.92 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESURF 1 U Colorado Department of Transportation 14:31 Thursday, November 12, 2020 2 2020 Cost Data PROJECTS BID FROM 01/01/20 THROUGH 09/30/20 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20200206 ROADSAFE TRAFFIC SYSTEMS, INC 2 $3,474,413.60 106.39 MTCER300-257 R3 FY 20/21 Region Wide Epoxy 3 M 20200206 HAMILTON CONSTRUCTION CO. 5 $3,357,952.85 84.13 NHPP4701-134 C-470 NOISE WALL WEST OF LUCEN 1 U 20200213 A and S CONSTRUCTION CO. 2 $5,376,000.00 114.38 STA069A-033 SH69 MP 58.7 TO 71.58 2 M 20200213 DURAN EXCAVATING, INC. 6 $1,160,406.20 106.49 FSA2873-194 US 287 Longmont Intersection I 4 U 20200213 A and S CONSTRUCTION CO. 3 $8,883,000.00 92.53 STR116A-001 SH 116 A Surface Treatment Pro 2 P 20200213 Straight Stripe Painting, Inc. 4 $2,068,435.00 116.92 MTCER500-213 R5 FY 20 / FY 21 STRIPING 5 M 20200227 Casper Electric, Inc. 4 $3,425,884.84 88.90 NHPP0702-359 I-70 No Name Tunnel Lighting 3 M 20200227 Casper Electric, Inc. 2 $1,081,340.90 97.02 C0402-094 US 40 GRAND COUNTY SIGNAL REPL 3 R 20200227 MARTIN MARIETTA MATERIALS 3 $5,351,155.83 113.85 NH0242-085 US 24 M.P. 291.38 to M.P. 296. 2 R 20200227 A and S CONSTRUCTION CO. 3 $6,758,000.00 96.46 STR0101-027 SH 10 Overlay La Junta West 2 P 20200305 APC SOUTHERN CONSTRUCTION COMPANY, LLC 3 $21,320,469.84 95.83 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 1 5 P 20200305 SEMA CONSTRUCTION, INC. 3 $14,138,928.75 119.86 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON SP 3 M 20200305 OLDCASTLE SW GROUP, INC. 4 $3,758,750.22 94.53 NHPP0502-082 US 50 MONTROSE RE CHIP SEAL 3 R 20200305 KSK, LLC 3 $1,400,000.00 110.27 STRR300-249 Grand and Jackson Counties ADA 3 M 20200305 TEZAK HEAVY EQUIPMENT CO., INC. 7 $2,071,985.91 94.18 BR025A-046 K-18-U ON I-25 AT MP112 BRIDGE 2 R 20200305 CASTLE ROCK CONST. CO. OF COLO, LLC 2 $4,519,619.33 100.44 STR2871-038 US 287 Passing Lanes Springfie 2 P 20200305 OLDCASTLE SW GROUP, INC. 1 $4,469,722.20 91.55 NHPP145A-080 SH 145 Keystone-Placerville Re 5 M Colorado Department of Transportation 14:31 Thursday, November 12, 2020 3 2020 Cost Data PROJECTS BID FROM 01/01/20 THROUGH 09/30/20 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20200305 KSK, LLC 4 $300,000.00 70.28 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 3 U 20200305 OLDCASTLE SW GROUP, INC. 2 $4,422,918.00 70.62 C0641-106 SH 64 Meeker West Rural Resurf 3 R 20200326 MOUNTAIN VALLEY CONTRACTING, INC. 2 $2,761,591.15 110.11 HPP 0501-067 US 50 AND SH 92 DELTA INTERSEC 3 U 20200326 KIRKLAND CONSTRUCTION, LLLP 8 $32,992,239.13 103.10 NH050A-034 US50A PUEBLO WEST PURCELL INTE 2 R 20200326 DURAN EXCAVATING, INC. 5 $2,391,211.25 96.23 SHE 0703-461 I-70 and Kipling North Phase 1 U 20200402 CASTLE ROCK CONST. CO. OF COLO, LLC 7 $11,765,116.33 89.67 IM0761-226 I76/SH52 Interchange 4 R 20200402 KSK, LLC 3 $1,235,000.00 107.36 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 3 R 20200402 OLDCASTLE SW GROUP, INC. 3 $6,333,543.94 100.47 NHPP1602-169 US 160 WC TUNNEL EAST RESURFAC 5 M 20200402 Kilgore Companies, LLC dba Elam Construc 4 $7,604,366.80 97.23 STR0341-101 SH 34 North of Grandby Resurfa 3 M 20200402 OLDCASTLE SW GROUP, INC. 2 $5,574,468.91 97.49 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 3 M 20200402 ROADSAFE TRAFFIC SYSTEMS, INC 2 $753,924.25 110.04 MTCER300-259 MTCE R3 FY20/21 Region Wide St 3 M 20200409 INTERMOUNTAIN SLURRY SEAL, INC. 3 $1,303,347.00 83.16 NHPP1601-077 US 160 MP 29.750 - MP 34.891 5 R 20200409 ABCO CONTRACTING, INC. 2 $3,226,884.00 76.19 SFTY2254-091 225 Ramp Improvements 1 U 20200409 TRICON 2, LLC 2 $2,277,000.00 103.50 IM0252-473 I-25 CABLE BARRIER PHASE IV 2 R 20200409 CC ENTRPRS TRAFFIC CONTROL SPECIALISTS 1 $2,165,914.00 114.25 SHER100-339 WWD TRAFFIC CONTROL ENHANCEMEN 1 R 20200423 CASTLE ROCK CONST. CO. OF COLO, LLC 8 $23,753,931.10 86.61 CC0852-106 US-85 LOUVIERS TO MP 191.75 1 R FBR0852-108 US-85 BETWEEN LOUVIERS AND MP 1 R 20200423 W.L. CONTRACTORS, INC. 3 $1,679,401.00 95.54 C1211-090 SH-121 & 29th Ave / SH-121 & S 1 U Colorado Department of Transportation 14:31 Thursday, November 12, 2020 4 2020 Cost Data PROJECTS BID FROM 01/01/20 THROUGH 09/30/20 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20200430 CONCRETE WORKS OF COLORADO INC. 3 $5,247,258.00 160.28 FSA1602-159 US 160 AND SH 17 INTERSECTION 5 U 20200430 OLDCASTLE SW GROUP, INC. 3 $1,827,783.00 126.03 C1601-082 Hawkins Signal and Curb Ramps 5 U 20200507 W.L. CONTRACTORS, INC. 3 $1,762,713.21 93.97 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 1 U 20200507 ZAK DIRT, INC. 8 $1,913,218.60 79.71 C0853-112 US85 & WCR98 INTERSECTION IMPR 4 R 20200507 ZAK DIRT, INC. 9 $2,466,070.75 88.17 FBR0343-042 US 34 D-27-G STRUCTURE REPLACE 4 P 20200514 INTERFACE COMMUNICATIONS COMPANY 4 $2,136,538.00 58.90 ITS SW02-304 ITS FIBER TO STATE BUILDINGS I 00 M 20200514 OLDCASTLE SW GROUP, INC. 3 $1,038,174.50 102.50 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 1 3 M 20200515 RLW/SEMA, A Joint Venture 1 $8,274,649.78 100.59 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 & 4 R 20200521 ROADSAFE TRAFFIC SYSTEMS, INC 2 $12,348,544.30 107.77 MTCE R100-341 Various Highways in Region 1 1 U 20200528 KIRKLAND CONSTRUCTION, LLLP 8 $1,975,485.70 89.79 NH050A-035 US 50A Pueblo Regional Pond 2 R NH050A-037 US 50A Pueblo Regional Pond 2 R 20200528 STURGEON ELECTRIC COMPANY, INC 2 $995,960.00 73.40 SHER400-373 R4 Signal Head Backplate Insta 4 R 20200528 PAONIA, INC 5 $2,221,563.29 57.59 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, S 00 R 20200528 TLM CONSTRUCTORS, INC. 3 $610,899.00 81.45 IM025A-048 Northbound I-25 bridge at Exit 2 M 20200528 HARVEY CONTRACTORS INC 4 $3,254,518.92 95.72 MTCER200-265 Pueblo 2 R 20200611 PAONIA, INC 2 $1,488,325.00 60.77 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 00 P 20200611 W.L. CONTRACTORS, INC. 3 $630,460.00 91.28 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENTS 4 U 20200618 MAIN ELECTRIC LTD 5 $1,409,599.14 78.31 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 2 U Colorado Department of Transportation 14:31 Thursday, November 12, 2020 5 2020 Cost Data PROJECTS BID FROM 01/01/20 THROUGH 09/30/20 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20200623 LAWRENCE CONSTRUCTION CO. 1 $77,748,000.00 100.00 NHPP5501-029 US 550/160 CONNECTION SOUTH DB 5 M 20200625 RALPH L. WADSWORTH CONSTRUCTION CO., LLC 2 $919,658.19 103.51 NHPPR100-251 SH 2/ Vasquez 1 U 20200702 INNOVATIVE MARKING SYSTEMS, INC. 5 $3,429,416.85 83.41 MTCER400-381 REGION 4 FY21 EPOXY 4 R 20200709 MIDWEST ROCKFALL, INC. 4 $2,880,537.20 105.37 C 0741-020 GEOHAZARD SH 74 MORRISON TO EV 1 M 20200709 TEZAK HEAVY EQUIPMENT CO., INC. 6 $570,845.95 63.43 NH0504-908 US50B PUEBLO (MP 318) STR K-18 2 P 20200709 VmCo Inc 4 $663,037.00 66.76 MTCER300-255 MTCE R3 FY20/21 Signal Replace 3 M 20200709 NORAA CONCRETE CONSTRUCTION CORPORATION 2 $2,523,898.00 143.37 STMM086-083 ADA PUEBLO METRO 2 U 20200709 MORTON ELECTRIC, INC. 6 $756,948.90 82.72 ITS 070A-033 I-70 FROM BENNETT TO BURLINGTO 00 P 20200709 AMERICAN WEST CONSTRUCTION, LLC 3 $537,943.45 97.81 STR012A-053 CRITICAL CULVERT REPAIR CO 12 2 M 20200709 KOLBE STRIPING INC. 3 $385,150.00 95.70 MTCER300-258 MTCE R3 FY20 Region Roundabout 3 M 20200723 AMERICAN CIVIL CONSTRUCTORS, LLC dba A 1 $357,160.00 76.64 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOUR 5 R 20200723 Frontier Environmental Services, LLC 2 $424,274.00 58.52 STMR200-249 US 24, M.P. 288.74; SH 115, M. 2 R 20200723 Frontier Environmental Services, LLC 2 $568,652.50 78.43 STMR200-260 R2 - 2020 CRITICAL CULVERT 2 M 20200806 AMERICAN WEST CONSTRUCTION, LLC 1 $497,913.75 99.61 STR184B-006 CULVERTS SH 184 5 M 20200806 W.L. CONTRACTORS, INC. 3 $804,665.40 80.57 FSAC010-124 US 40, US 287, SH 88 1 U 20200806 APC CONSTRUCTION CO., LLC 5 $888,362.00 71.07 MTCE R100-334 ZANG STREET AND COAL CREEK YAR 1 U 20200806 STURGEON ELECTRIC COMPANY, INC 2 $2,863,242.00 108.48 SHER100-345 SIGNAL CONST PACKAGE B - 21793 1 U Colorado Department of Transportation 14:31 Thursday, November 12, 2020 6 2020 Cost Data PROJECTS BID FROM 01/01/20 THROUGH 09/30/20 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20200819 SEMA CONSTRUCTION, INC. 1 $213,123.88 100.00 IM0252-498 I-25 Maintenance Region 2 Pueb 2 U 20200820 Myers and Sons Construction, LP 7 $2,348,413.60 65.23 BR2871-036 US 287 BRIDGE PREVENTATIVE MAI 2 P 20200820 KSK, LLC 3 $745,000.00 77.59 CC080-038 VARIOUS ADA RAMPS THROUGHOUT M 3 R 20200820 MORTON ELECTRIC, INC. 2 $541,906.00 108.39 SHER400-379 Signal Head Backplate Install 4 R 20200827 Lobato Construction, LLC 8 $2,200,000.00 100.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 2 R 20200901 SEMA CONSTRUCTION, INC. 1 $3,375,240.32 100.00 STM094A-038 SH94 WB PASSING LANE 2 R 20200903 JALISCO INTERNATIONAL, INC. 6 $2,184,937.00 74.20 C R100-288 R1 CURB RAMPS - PH 2 1 U 20200903 WORK ZONE TRAFFIC CONTROL, LLC 3 $459,500.00 91.91 MTCE0702-386 Grand Junction 3 M 20200903 SEMA CONSTRUCTION, INC. 7 $3,170,523.00 89.72 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 1 U 20200903 JALISCO INTERNATIONAL, INC. 5 $1,527,137.78 84.45 C088A-036 R1 ADA CURB RAMPS - 088A, 075B 1 R 20200908 American Civil Constructors West Coast, 5 $795,000.00 108.20 ER0702-406 ER I-7- Glenwood Canyon Grzly 3 M 20200917 MORTON ELECTRIC, INC. 3 $686,555.40 105.62 STM067A-040 SH 67 & KELLY RD SIGNAL IMPROV 2 U 20200917 RALPH L. WADSWORTH CONSTRUCTION CO., LLC 7 $7,975,169.43 93.74 NHPP1602-167 US 160 MP 126.4-128.19 5 M 20200917 AMERICAN WEST CONSTRUCTION, LLC 4 $244,123.00 49.28 CR400-374 FY 20 Culvert Prioritization a 4 P 20200917 SCOTT CONTRACTING INC. 6 $9,897,011.70 94.26 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 2 U 20200917 CEC Infrastructure Group, LLC 2 $2,294,975.00 100.59 SHER100-338 WWD TRAFFIC CONTROL ENHANCEMEN 1 U 20200918 RLW/SEMA, A Joint Venture 1 $35,653,936.55 104.97 NHPP0253-283 I-25 Express Lanes Segment 6 C 4 R ======= ================ ====== TOTALS 356 $518,739,079.63 98.55 Colorado Department of Transportation 14:31 Thursday, November 12, 2020 1 2020 Cost Data BRIDGE COST PER SQUARE FOOT (01/01/20 THROUGH 09/30/20) ------------------------------------------------------------------------------------------------------------------------------------ PROJECT NUMBER/ TERR/ TOTAL TOTAL COST PER DATE LET PROJECT LOCATION BRIDGE ID LENGTH WIDTH SQUARE FT COST SQUARE FOOT ------------------------------------------------------------------------------------------------------------------------------------ BRIDGE REPAIR 200123 NH 0503-093 M US50 WEST OF TEXAS CREEK MP 25 0300 63.0000 66.6600 4199.6 $64,349 $15.32 0301 84.3300 34.0000 2867.2 $45,164 $15.75 0302 141.0000 73.5000 10363.5 $72,793 $7.02 200206 NHPP 0852-116 U US85:HAMPDEN TO FLORIDA-RESURF 0300 200.0000 120.0000 24000.0 $1,909,206 $79.55 200213 STA069A-033 M SH69 MP 58.7 TO 71.58 0300 123.3000 25.0000 3082.5 $36,358 $11.79 WEIGHTED AVERAGE COST: NEW STRUCTURES 44512.8 $2,127,869 $47.80 CONCRETE SLAB AND GIRDER 200206 STA059A-036 P SH 59 SEIBERT TO COPE 0300 120.0000 34.0000 4080.0 $530,047 $129.91 200507 FBR0343-042 P US 34 D-27-G STRUCTURE REPLACE 0300 82.5000 48.0000 3960.0 $842,133 $212.66 WEIGHTED AVERAGE COST: NEW STRUCTURES 8040.0 $1,372,179 $170.67 CONCRETE SLAB BRIDGE 200227 STR0101-027 P SH 10 Overlay La Junta West 0300 32.0000 41.0000 1312.0 $43,017 $32.79 WEIGHTED AVERAGE COST: NEW STRUCTURES 1312.0 $43,017 $32.79 PRESTRES GIRDER (BOX SECTION) 200116 BR0343-040 P US 34 REPUBLICAN RIVER BRIDGES 0300 115.5000 43.0000 4966.5 $1,026,755 $206.74 200116 FBR0343-043 P US 34 D-28-P STRUCTURE REPLACE 0300 128.5000 43.0000 5525.5 $1,230,872 $222.76 WEIGHTED AVERAGE COST: NEW STRUCTURES 10492.0 $2,257,627 $215.18 MAJOR STRUCTURE CBC OR PIPES 200917 NHPP1602-167 M US 160 MP 126.4-128.19 0300 100.0000 100.0000 10000.0 $1,354,947 $135.49 WEIGHTED AVERAGE COST: NEW STRUCTURES 10000.0 $1,354,947 $135.49 Colorado Department of Transportation 14:31 Thursday, November 12, 2020 2 2020 Cost Data BRIDGE COST PER SQUARE FOOT (01/01/20 THROUGH 09/30/20) ------------------------------------------------------------------------------------------------------------------------------------ PROJECT NUMBER/ TERR/ TOTAL TOTAL COST PER DATE LET PROJECT LOCATION BRIDGE ID LENGTH WIDTH SQUARE FT COST SQUARE FOOT ------------------------------------------------------------------------------------------------------------------------------------ TIMBER BRIDGE (GLUELAM) 200827 BR101A-004 R SH 101 (MP 19.35)(MP 19.98) 0300 29.0000 25.0000 725.0 $307,204 $423.73 WEIGHTED AVERAGE COST: NEW STRUCTURES 725.0 $307,204 $423.73 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 1 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 201-00000 Clear and Grub LUMP SUM =============================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 1.00 15000.00 30509.00 20000.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 1.00 7500.00 30000.00 30000.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 1.00 12500.00 55801.76 13596.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 1.00 5000.00 33000.00 15000.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 1.00 10000.00 24614.17 5200.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1.00 26000.00 55750.00 75000.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1.00 320000.00 319725.00 115000.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1.00 5000.00 18160.00 22320.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1.00 9000.00 17463.60 4818.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9.00 45555.56 95841.81 33437.11 IM0761-226 I76/SH52 Interchange 04/02/20 1.00 50000.00 144432.86 29999.99 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 1.00 25000.00 9670.00 18100.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 1.00 60000.00 37500.00 25000.00 SFTY2254-091 225 Ramp Improvements 04/09/20 1.00 20000.00 33000.00 59000.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 37500.00 240540.56 166399.60 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 1.00 10000.00 83700.00 146100.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 1.00 18000.00 22367.50 15100.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 1.00 8000.00 11290.31 870.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1.00 142000.00 159773.52 159773.52 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 1.00 40000.00 36097.25 35000.00 NH050A-037 US 50A Pueblo Regional Pond SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 1.00 21000.00 5248.20 2541.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 11.00 39227.27 80881.36 59807.65 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 1.00 25000.00 21459.01 23754.03 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 1.00 3000.00 6876.00 16000.00 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 1.00 9600.00 7750.00 3500.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 1.00 50000.00 13000.00 3000.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 1.00 10000.00 20000.00 10000.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 1.00 13873.01 13873.01 13873.01 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1.00 5000.00 52857.14 135000.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 1.00 30000.00 76555.55 100000.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 1.00 16798.00 8383.00 2750.00 CR400-374 FY 20 Culvert Prioritization 09/17/20 1.00 6000.00 5532.00 4500.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 2313532.59 100149.69 100149.69 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 11.00 225709.42 34159.75 37502.43 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 31.00 107235.60 70906.80 44236.93 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 2 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 201-00001 Clear and Grub Acre =================================================== PWQM240-172 El Paso County, north Colorad 01/23/20 4.00 6250.00 21150.00 18300.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 157.00 1000.00 820.85 957.54 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 13.00 8000.00 1602.61 1010.53 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 1.00 10000.00 26161.56 3106.92 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 175.00 1691.43 1524.64 1370.16 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 1.10 5000.00 5000.00 5000.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 22.00 10000.00 3663.68 605.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 23.10 9761.90 3674.73 814.29 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 198.10 2632.51 1968.26 1305.34 =============== 201-00005 Rem of Debris LUMP SUM =============================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 1.00 5000.00 13834.15 23656.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 1.00 15000.00 27500.00 25000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 10000.00 19300.49 24328.00 CR400-374 FY 20 Culvert Prioritization 09/17/20 1.00 3000.00 5734.50 4500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 3000.00 5734.50 4500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 7666.67 13271.16 17718.67 =============== 201-00007 Rem of Debris Each =================================================== STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 1.00 600.00 270.00 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 600.00 270.00 250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 600.00 270.00 250.00 =============== 202-00000 Rem Str and Obstructions LUMP SUM =============================================== PWQM240-172 El Paso County, north Colorad 01/23/20 1.00 5000.00 10250.00 7500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 5000.00 10250.00 7500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5000.00 10250.00 7500.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 3 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00001 Rem Structure Each =================================================== NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 2.00 2000.00 2623.57 2623.57 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 2000.00 2623.57 2623.57 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 4.00 2500.00 2123.39 2566.96 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 2.00 100.00 1587.31 734.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 2.00 1485.07 2602.35 2602.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 1646.27 1962.36 2117.57 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 1717.01 1999.10 2218.77 =============== 202-00002 Rem of Structure (Spec) Each =================================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 5000.00 5017.45 950.30 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 5000.00 5017.45 950.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5000.00 5017.45 950.30 =============== 202-00003 Rem of Structure (Spec) LUMP SUM =============================================== NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1.00 39000.00 37614.04 37614.04 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 39000.00 37614.04 37614.04 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 39000.00 37614.04 37614.04 =============== 202-00008 Tree Trimming Hour =================================================== NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 8.00 300.00 90.73 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 300.00 90.73 150.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 8.00 250.00 241.67 225.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 250.00 241.67 225.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 275.00 155.41 187.50 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 4 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00009 Tree Trimming LUMP SUM =============================================== NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 1.00 3000.00 5975.00 5975.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 3000.00 5975.00 5975.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 3000.00 5975.00 5975.00 =============== 202-00010 Rem Tree Each =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 4.00 300.00 750.00 750.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 9.00 750.00 779.03 1060.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 1.00 500.00 1192.00 150.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 1.00 1000.00 2050.00 2500.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 3.00 250.00 759.50 1000.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1.00 350.00 2122.00 1700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 19.00 555.26 893.25 1046.84 IM0761-226 I76/SH52 Interchange 04/02/20 9.00 500.00 457.00 540.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 71.00 320.00 760.94 445.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 1.00 800.00 2515.67 537.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 1.00 350.00 833.23 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 82.00 345.98 740.36 465.76 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 2.00 250.00 270.00 250.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 1.00 350.00 1576.67 1000.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 7.00 450.00 844.93 1000.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 3.00 901.79 1345.28 1345.28 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 13.00 515.80 868.60 964.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 114.00 400.22 767.92 619.45 =============== 202-00015 Rem Headwall Each =================================================== NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 1.00 1400.00 750.00 750.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 5 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00015 Rem Headwall Each =================================================== HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 2.00 1500.00 3027.48 1586.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 1466.67 2571.98 1307.33 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 17.00 2500.00 824.69 401.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 3.00 2000.00 2259.07 2259.07 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20.00 2425.00 855.65 680.14 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1.00 2500.00 2136.29 2000.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 5.00 1749.68 2291.45 2291.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 1874.73 2200.94 2242.88 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 29.00 2212.01 1014.15 1068.34 =============== 202-00019 Rem Inlet Each =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 2.00 800.00 1300.00 1300.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 4.00 2000.00 1558.33 2000.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 8.00 1000.00 1082.67 1600.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 3.00 1100.00 1777.00 1121.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1.00 1245.00 2008.00 1028.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 18.00 1230.28 1250.48 1543.94 IM0761-226 I76/SH52 Interchange 04/02/20 5.00 1200.00 1121.16 938.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 2.00 1000.00 1379.24 2750.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7.00 1142.86 1202.13 1455.71 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 3.00 1200.00 1700.00 1900.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 6 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00019 Rem Inlet Each =================================================== SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 3.00 1000.00 1531.43 1500.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 1.00 1000.00 1333.47 1930.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 2.00 874.85 1301.18 1301.18 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9.00 1038.86 1513.23 1636.93 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 34.00 1161.61 1288.94 1550.39 =============== 202-00020 Rem CBC Each =================================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 9.00 10000.00 6883.54 1782.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 9.00 10000.00 6883.54 1782.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 10000.00 6883.54 1782.00 =============== 202-00021 Rem Manhole Each =================================================== PWQM240-172 El Paso County, north Colorad 01/23/20 1.00 2500.00 1291.50 1283.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1.00 1500.00 1920.00 1500.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 4.00 1200.00 1400.01 1500.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1.00 1200.00 3280.43 740.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7.00 1428.57 1530.87 1360.43 IM0761-226 I76/SH52 Interchange 04/02/20 1.00 1000.00 1209.13 1177.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 1000.00 1209.13 1177.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 1500.00 1605.00 1605.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1500.00 1605.00 1605.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 1388.89 1484.53 1367.22 =============== 202-00023 Rem Emb Prot Ty 3 Each =================================================== NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 2.00 1000.00 801.99 801.99 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 1000.00 801.99 801.99 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1000.00 801.99 801.99 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 7 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00024 Rem Emb Prot Ty 5 Each =================================================== IM0761-226 I76/SH52 Interchange 04/02/20 4.00 500.00 521.32 489.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 500.00 521.32 489.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 4.00 500.00 922.41 595.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 500.00 922.41 595.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 500.00 706.44 542.00 =============== 202-00025 Rem Ditch Lining Lin Foot =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 544.00 7.62 11.62 11.62 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 544.00 7.62 11.62 11.62 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 544.00 7.62 11.62 11.62 =============== 202-00026 Rem S and D Pave Sq Yard ================================================ FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 402.00 25.00 27.42 25.00 STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 45.50 40.00 130.00 130.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 109.00 18.50 16.63 36.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 556.50 24.95 25.18 35.74 SFTY2254-091 225 Ramp Improvements 04/09/20 2,141.00 40.00 25.50 33.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,141.00 40.00 25.50 33.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 586.00 10.49 22.17 22.17 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 586.00 10.49 22.17 22.17 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,283.50 32.18 25.12 31.53 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 8 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00027 Rem Riprap Sq Yard ================================================ FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 43.00 20.00 32.00 32.00 PWQM240-172 El Paso County, north Colorad 01/23/20 121.00 25.00 40.50 59.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 3.00 250.00 727.70 1818.10 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 12.00 100.00 74.67 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 179.00 32.60 61.86 87.43 SFTY2254-091 225 Ramp Improvements 04/09/20 26.00 75.00 57.50 89.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 26.00 75.00 57.50 89.00 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 309.00 45.00 26.20 13.76 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 309.00 45.00 26.20 13.76 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 514.00 42.20 32.19 43.22 =============== 202-00029 Rem Gabion Cubic Yard ============================================= STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 78.00 50.00 68.00 61.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 78.00 50.00 68.00 61.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 78.00 50.00 68.00 61.00 =============== 202-00030 Rem Water Service Each =================================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 2000.00 2207.42 3217.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1.00 7000.00 2136.54 2136.54 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 4500.00 2199.55 2677.02 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 3145.28 1513.75 1513.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 3145.28 1513.75 1513.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 4048.43 2130.97 2289.26 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 9 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00031 Rem of Fire Hydrant Each =================================================== IM0761-226 I76/SH52 Interchange 04/02/20 1.00 2000.00 1436.01 1611.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 2000.00 1436.01 1611.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2000.00 1436.01 1611.00 =============== 202-00032 Rem Valve Each =================================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 959.04 975.19 975.19 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 959.04 975.19 975.19 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 959.04 975.19 975.19 =============== 202-00033 Rem Pipe Each =================================================== NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 2.00 2000.00 1500.00 1500.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 9.00 2000.00 3236.67 7000.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 11.00 2500.00 4249.25 2300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 22.00 2250.00 3968.58 4150.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 22.00 2250.00 3968.58 4150.00 =============== 202-00035 Rem Pipe Lin Foot =============================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 420.00 20.00 21.00 21.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 620.00 20.00 22.41 13.00 PWQM240-172 El Paso County, north Colorad 01/23/20 377.00 35.00 29.50 27.00 STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 42.00 50.00 120.00 120.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 76.00 30.00 82.83 48.48 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 20.00 30.00 122.17 190.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1,014.00 22.00 40.45 56.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 375.00 30.00 83.70 17.60 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 61.00 35.00 55.00 42.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,005.00 24.85 40.83 35.12 IM0761-226 I76/SH52 Interchange 04/02/20 776.00 28.00 25.58 18.99 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 10 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00035 Rem Pipe Lin Foot =============================================== STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 134.00 25.00 27.13 37.00 SFTY2254-091 225 Ramp Improvements 04/09/20 3.00 50.00 297.50 295.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 656.00 25.00 42.95 13.20 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 2,953.00 30.48 33.48 33.48 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4,522.00 29.11 33.90 28.33 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 50.00 51.00 44.00 70.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 91.00 53.47 53.47 53.47 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 291.00 35.00 36.00 35.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 938.00 10.00 28.34 34.50 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 321.00 30.00 25.78 7.35 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1,112.00 28.96 35.47 35.47 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,803.00 24.55 30.33 33.08 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10,330.00 26.63 35.13 31.59 =============== 202-00036 Rem of Pipe (Spec) Lin Foot =============================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 183.00 5.00 19.83 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 183.00 5.00 19.83 35.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1,133.00 44.61 52.70 52.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,133.00 44.61 52.70 52.70 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,316.00 39.10 41.97 50.24 =============== 202-00037 Rem of End Section Each =================================================== STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 1.00 650.00 2200.00 2200.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 1.00 300.00 405.77 480.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 7.00 200.00 493.33 580.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 20.00 280.00 317.50 550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 29.00 274.14 348.76 611.72 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 11 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00037 Rem of End Section Each =================================================== IM0761-226 I76/SH52 Interchange 04/02/20 15.00 300.00 347.32 231.01 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 14.00 590.00 359.36 198.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 4.00 568.00 878.16 878.16 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 33.00 455.52 363.03 295.45 STM094A-038 SH94 WB PASSING LANE 09/01/20 2.00 326.83 326.83 326.83 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 3.00 500.00 440.71 200.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 11.00 730.30 899.31 899.31 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 16.00 636.69 582.38 696.63 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 78.00 425.24 374.03 495.33 =============== 202-00039 Rem of Bollard Each =================================================== STRR300-249 Grand and Jackson Counties AD 03/05/20 1.00 700.00 776.67 180.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 2.00 100.00 441.67 270.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 300.00 553.33 240.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 1.00 300.00 1095.00 1800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 300.00 1095.00 1800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 300.00 688.75 630.00 =============== 202-00047 Rem Elec Equipment LUMP SUM =============================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 1.00 5750.00 12600.00 1500.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 1.00 5000.00 6204.75 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 5375.00 8945.57 2000.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 12 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00047 Rem Elec Equipment LUMP SUM =============================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 2000.00 5638.05 5500.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 2000.00 5638.05 5500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 4250.00 7181.56 3166.67 =============== 202-00055 Rem of FO Cable Lin Foot =============================================== IM0761-226 I76/SH52 Interchange 04/02/20 5,450.00 1.00 2.10 1.29 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,450.00 1.00 2.10 1.29 STM094A-038 SH94 WB PASSING LANE 09/01/20 2,450.00 2.42 2.42 2.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,450.00 2.42 2.42 2.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,900.00 1.44 2.12 1.64 =============== 202-00070 Rem Barricade Each =================================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 2.00 900.00 691.95 605.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 900.00 691.95 605.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 900.00 691.95 605.00 =============== 202-00090 Rem Delineator Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 100.00 6.00 5.23 5.50 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 21.00 10.00 27.62 8.60 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 100.00 15.00 5.25 5.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 300.00 10.00 3.58 3.15 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 13 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00090 Rem Delineator Each =================================================== STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 5.00 5.00 15.78 13.25 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 176.00 10.00 5.50 5.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 650.00 7.00 8.89 9.90 FSA2873-194 US 287 Longmont Intersection 02/13/20 6.00 10.00 29.50 22.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 396.00 8.00 4.59 6.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 450.00 7.00 6.22 5.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 272.00 9.50 5.36 5.70 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 861.00 4.00 6.79 6.06 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 565.00 10.00 8.00 8.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 44.00 10.00 8.43 10.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 9.00 8.77 35.88 17.19 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 150.00 10.00 8.10 12.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 200.00 7.00 6.05 2.25 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 15.00 28.00 34.00 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,320.00 7.76 7.20 6.71 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 586.00 7.50 4.88 7.58 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 550.00 7.00 7.45 9.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 17.00 10.00 5.25 5.00 SFTY2254-091 225 Ramp Improvements 04/09/20 26.00 10.00 31.50 31.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 160.00 25.00 7.12 4.40 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 20.00 20.00 23.33 27.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 24.00 20.00 34.19 30.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 18.00 15.00 67.00 60.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 90.00 16.00 16.21 16.21 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 12.00 10.00 29.02 22.58 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,503.00 10.24 9.07 10.02 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 9.00 10.00 52.50 65.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 9.00 9.40 20.99 30.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 11.00 5.35 5.35 5.35 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 14.00 35.00 78.14 15.72 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 151.00 10.00 7.57 5.85 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 99.00 20.00 9.73 7.35 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 4.00 60.00 70.83 20.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 11.00 20.00 27.16 27.16 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 308.00 15.17 12.68 10.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,131.00 8.74 8.21 7.69 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 14 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00150 Rem Wall Each =================================================== STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 1.00 8000.00 2950.00 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 8000.00 2950.00 2000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 8000.00 2950.00 2000.00 =============== 202-00155 Rem Wall Lin Foot =============================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 25.00 200.00 16.00 16.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 56.00 60.00 97.54 100.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC PWQM240-172 El Paso County, north Colorad 01/23/20 81.00 50.00 110.50 190.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 20.00 100.00 69.58 140.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 157.00 200.00 100.20 104.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 339.00 135.13 97.89 119.52 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 339.00 135.13 97.89 119.52 =============== 202-00160 Rem Wall Sq Foot ================================================ C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 66.00 60.00 71.50 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 66.00 60.00 71.50 25.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 66.00 60.00 71.50 25.00 =============== 202-00170 Grinding And Texturing Conc Pvmt Sq Yard ================================================ NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 85.00 42.00 167.33 258.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 72,316.00 9.00 5.50 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 72,401.00 9.04 5.78 5.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 72,401.00 9.04 5.78 5.30 =============== 202-00190 Rem of Conc Median Cover Matl Sq Yard ================================================ FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 55.00 21.00 22.00 22.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 15 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00190 Rem of Conc Median Cover Matl Sq Yard ================================================ NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 44.50 24.00 41.23 47.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 88.00 30.00 25.12 34.20 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1,519.00 20.00 9.75 14.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 723.00 14.00 19.23 14.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,429.50 18.67 11.36 15.79 IM0761-226 I76/SH52 Interchange 04/02/20 327.00 20.00 9.79 2.01 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 34.00 22.00 348.18 40.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 50.00 22.00 31.53 40.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 46.00 25.00 78.00 108.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 12.00 40.00 66.33 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 469.00 21.36 46.79 20.31 STMM086-083 ADA PUEBLO METRO 07/09/20 306.00 15.00 27.50 25.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 437.00 35.00 28.00 35.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 59.00 25.00 22.93 11.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 4,147.00 7.00 10.01 4.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,949.00 10.18 11.20 8.66 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,847.50 13.48 13.60 11.56 =============== 202-00195 Rem of Median Cover Sq Yard ================================================ NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 48.00 60.00 67.33 55.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1,540.00 10.00 9.48 15.10 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 65.00 25.00 34.00 56.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,653.00 12.04 12.69 17.87 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 83.00 25.00 45.00 16.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 24.00 60.00 67.17 58.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 108.00 50.00 35.76 20.79 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 215.00 41.47 41.06 23.09 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,868.00 15.43 16.79 18.47 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 16 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00200 Rem Sidewalk Sq Yard ================================================ FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 161.00 26.00 22.00 22.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 758.50 23.00 27.40 28.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 520.00 23.00 18.57 20.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 21.40 60.00 80.00 30.00 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 2.00 100.00 227.00 75.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 31.00 30.00 44.60 101.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 42.00 30.00 41.99 24.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 202.00 25.00 39.00 47.00 STRR300-249 Grand and Jackson Counties AD 03/05/20 1,228.00 40.00 53.00 39.00 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 443.00 40.00 41.17 23.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 490.00 40.00 10.00 10.50 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 301.00 32.00 12.94 22.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 457.00 19.00 23.10 15.20 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 222.00 35.00 26.60 17.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,878.90 31.74 29.67 26.68 IM0761-226 I76/SH52 Interchange 04/02/20 278.00 40.00 12.74 5.50 C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 110.00 18.00 32.20 43.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 663.00 35.00 61.00 55.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 124.00 35.00 45.33 41.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 10.00 100.00 138.25 183.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 25.00 22.00 45.27 100.00 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 2.00 25.00 576.70 250.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 77.00 50.00 49.00 47.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 13.00 50.00 41.35 20.77 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,302.00 35.90 40.00 43.42 STMM086-083 ADA PUEBLO METRO 07/09/20 2,297.00 15.00 25.00 20.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 157.00 30.00 35.00 35.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 139.00 30.00 42.73 38.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 1,306.00 40.00 26.00 29.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 3,636.00 28.00 31.17 40.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 1,502.00 32.00 32.22 41.11 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 229.00 25.00 20.11 13.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 147.00 30.00 18.25 11.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 250.00 50.00 26.14 32.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9,663.00 27.74 29.55 32.54 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15,843.90 29.64 30.40 31.63 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 17 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00201 Rem Curb Lin Foot =============================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 206.00 7.00 7.00 7.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 925.00 8.00 7.26 11.50 STRR300-249 Grand and Jackson Counties AD 03/05/20 106.00 25.00 45.33 15.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 946.00 15.00 6.10 7.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,183.00 11.76 9.16 9.45 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 220.00 11.00 8.78 11.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 88.00 10.00 20.00 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 308.00 10.71 11.99 11.57 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 109.00 15.00 12.61 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 109.00 15.00 12.61 14.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,600.00 11.78 9.92 9.89 =============== 202-00202 Rem Gutter Lin Foot =============================================== STRR300-249 Grand and Jackson Counties AD 03/05/20 21.00 20.00 61.00 31.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 688.00 10.00 6.52 9.25 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 54.00 16.00 20.73 5.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 763.00 10.70 8.74 9.61 IM0761-226 I76/SH52 Interchange 04/02/20 134.00 15.00 9.61 10.50 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 113.00 30.00 53.00 44.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 247.00 21.86 21.13 25.83 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,010.00 13.43 13.24 13.58 =============== 202-00203 Rem Curb and Gutter Lin Foot =============================================== NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 355.00 30.00 19.67 14.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 18 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00203 Rem Curb and Gutter Lin Foot =============================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 271.00 9.00 9.00 9.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 2,062.00 17.00 11.60 12.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 538.00 15.00 12.22 9.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 63.90 20.00 20.00 10.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 141.00 20.00 18.16 10.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 159.00 20.00 21.00 15.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 901.00 11.00 9.89 12.00 STRR300-249 Grand and Jackson Counties AD 03/05/20 2,512.00 20.00 23.67 15.00 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 843.00 35.00 20.77 15.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 6,287.00 10.00 5.35 7.25 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 3,930.00 9.00 5.88 6.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 3,126.00 8.00 5.65 6.50 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 743.00 17.00 16.50 10.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 21,931.90 13.18 9.50 9.11 IM0761-226 I76/SH52 Interchange 04/02/20 2,737.00 10.00 4.53 1.70 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 145.00 15.00 11.70 14.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 651.00 10.00 12.37 15.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 828.00 15.00 50.33 44.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 163.00 20.00 23.00 7.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 200.00 14.00 21.83 15.50 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 100.00 15.00 49.17 30.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 569.00 5.00 7.52 7.52 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 35.00 40.00 31.33 21.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 272.00 15.00 14.71 11.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,700.00 11.29 11.22 11.98 STMM086-083 ADA PUEBLO METRO 07/09/20 3,627.00 10.00 17.50 15.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 2,204.00 15.00 13.50 17.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 156.00 16.00 15.77 15.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 2,133.00 20.00 15.33 18.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 5,026.00 14.00 18.33 23.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 3,785.00 12.00 17.18 17.91 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1,044.00 15.00 10.12 10.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 9,461.00 10.00 4.17 2.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 560.00 34.00 14.21 15.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 27,996.00 12.84 11.28 12.64 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 55,627.90 12.82 10.66 11.18 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 19 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00205 Rem Wheel Stop Each =================================================== FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 1.00 150.00 760.00 92.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 150.00 760.00 92.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 150.00 760.00 92.00 =============== 202-00206 Rem Conc Curb Ramp Sq Yard ================================================ NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 216.00 50.00 58.67 33.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 94.00 45.00 32.00 32.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 814.00 41.00 35.00 29.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 91.00 45.00 34.32 25.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 78.00 40.00 28.00 16.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 28.00 40.00 57.48 28.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 50.00 48.00 29.83 34.95 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 76.00 40.00 35.17 58.50 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 85.00 40.00 34.00 26.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,532.00 42.81 38.34 30.32 IM0761-226 I76/SH52 Interchange 04/02/20 43.00 50.00 27.57 15.99 C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 102.00 24.00 35.20 40.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 440.00 50.00 56.67 42.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 83.00 40.00 42.00 41.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 51.00 50.00 49.50 44.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 111.00 35.00 41.96 20.79 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 830.00 43.80 46.88 37.59 STMM086-083 ADA PUEBLO METRO 07/09/20 2,817.00 25.00 30.00 20.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 155.00 50.00 56.00 70.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 98.00 40.00 47.17 42.50 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 60.00 40.00 32.79 30.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 44.00 40.00 33.05 16.20 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 167.00 50.00 30.57 45.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,341.00 28.32 32.07 24.38 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,703.00 34.46 36.89 27.90 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 20 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00207 Rem of Brick Pavers Sq Yard ================================================ STRR300-249 Grand and Jackson Counties AD 03/05/20 659.00 35.00 14.67 17.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 47.00 50.00 53.67 28.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 706.00 36.00 17.26 17.73 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 3.00 50.00 91.40 29.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 50.00 91.40 29.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 78.00 40.00 21.38 16.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 78.00 40.00 21.38 16.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 787.00 36.45 18.43 17.66 =============== 202-00210 Rem Conc Pavement Sq Yard ================================================ FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 100.00 40.00 99.33 85.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 599.00 17.50 30.17 32.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 59.00 40.00 93.93 55.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 6,227.00 40.00 55.00 55.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 737.00 40.00 30.60 30.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 1,285.00 22.00 27.47 22.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 38.00 60.00 75.00 105.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 7,708.00 12.00 9.58 10.31 STRR300-249 Grand and Jackson Counties AD 03/05/20 389.00 40.00 68.33 41.00 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 53.00 35.00 38.26 27.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 52.00 30.00 43.46 80.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 2,316.00 20.00 24.25 34.40 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 339.00 40.00 64.00 32.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 19,902.00 24.99 32.19 31.12 IM0761-226 I76/SH52 Interchange 04/02/20 12,213.00 18.00 11.26 9.20 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 21 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00210 Rem Conc Pavement Sq Yard ================================================ SFTY2254-091 225 Ramp Improvements 04/09/20 1,184.00 35.00 49.00 46.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 27,207.00 12.00 6.80 4.61 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1601-082 Hawkins Signal and Curb Ramps 04/30/20 417.00 40.00 68.67 45.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 24.00 100.00 69.67 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 41,045.00 14.78 8.64 7.61 STMM086-083 ADA PUEBLO METRO 07/09/20 1,265.00 25.00 38.50 25.00 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 1,134.00 20.00 16.17 12.85 FSAC010-124 US 40, US 287, SH 88 08/06/20 45.00 40.00 43.00 45.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 441.00 60.00 85.57 80.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 64.00 35.00 28.33 22.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 81.00 35.00 52.00 50.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 273.00 40.00 39.31 47.55 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 808.00 35.00 34.30 25.00 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 35.00 35.00 791.00 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,146.00 30.89 45.39 30.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 65,093.00 18.93 13.65 16.23 =============== 202-00212 Rem Conc Pavement (Spec) Sq Yard ================================================ STR2871-038 US 287 Passing Lanes Springfi 03/05/20 7,389.00 15.00 16.39 17.29 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7,389.00 15.00 16.39 17.29 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1,241.00 19.59 21.45 21.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,241.00 19.59 21.45 21.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,630.00 15.66 16.78 17.89 =============== 202-00215 Rem Conc Pvmt (Planing) Sq Yard ================================================ NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 450.00 28.00 19.43 21.38 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 450.00 28.00 19.43 21.38 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 450.00 28.00 19.43 21.38 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 22 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00217 Rem Conc Pvmt (Planing) (Spec) Sq Yard ================================================ BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 1,202.00 39.27 51.29 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,202.00 39.27 51.29 25.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,202.00 39.27 51.29 25.00 =============== 202-00220 Rem Asphalt Mat Sq Yard ================================================ FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 950.00 12.00 25.44 15.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 3,027.00 10.00 8.00 8.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 10,697.00 5.00 16.83 5.50 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 5,774.00 7.00 6.30 4.75 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STA006A-067 SH 6 Merino to Atwood 01/16/20 1,000.00 8.00 4.30 3.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 3,474.00 10.00 9.00 10.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 2,219.00 6.00 36.00 35.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 1,043.00 8.00 22.86 11.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 2,427.00 8.00 9.06 9.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 213.00 25.00 34.00 37.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 244.00 25.00 59.00 59.00 STRR300-249 Grand and Jackson Counties AD 03/05/20 757.00 50.00 46.00 20.00 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 28.00 50.00 27.03 8.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 3,226.00 4.00 11.75 17.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1,482.00 7.00 27.03 26.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 3,568.00 7.00 14.30 14.90 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 741.00 12.00 40.50 21.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 40,870.00 8.01 15.32 11.59 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 3,733.00 8.00 6.43 3.25 IM0761-226 I76/SH52 Interchange 04/02/20 22,279.00 7.00 5.33 3.70 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 210.00 10.00 21.62 21.00 SFTY2254-091 225 Ramp Improvements 04/09/20 669.00 25.00 25.50 19.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 51,570.00 8.00 4.73 7.19 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1601-082 Hawkins Signal and Curb Ramps 04/30/20 48.00 30.00 128.67 310.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 10,648.00 6.00 18.17 14.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 9,048.00 7.00 5.40 5.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 125.00 50.00 48.00 55.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 2,267.00 6.50 7.02 8.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 170.00 9.00 20.27 25.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 23 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00220 Rem Asphalt Mat Sq Yard ================================================ NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 15,851.00 3.70 3.23 3.23 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 27.00 65.00 51.50 60.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 233.00 25.00 42.64 31.19 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 116,878.00 7.14 5.75 6.68 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 618.00 8.00 21.13 22.00 STMM086-083 ADA PUEBLO METRO 07/09/20 1,558.00 13.00 50.50 25.00 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 36.00 44.00 31.33 57.00 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 42.00 20.00 73.00 36.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 1,047.00 30.00 35.00 35.00 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 5,555.00 6.00 11.48 3.90 FSAC010-124 US 40, US 287, SH 88 08/06/20 93.00 35.00 56.67 54.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 125.00 50.00 33.67 6.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 2,562.00 14.53 10.53 6.90 STM094A-038 SH94 WB PASSING LANE 09/01/20 5,005.00 10.34 10.34 10.34 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 1,117.00 35.00 35.33 30.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 798.00 25.00 32.02 30.12 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 3,736.00 13.00 8.55 10.00 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 250.00 25.00 45.75 35.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 19,665.00 20.00 6.40 2.60 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 258.00 30.00 52.05 52.70 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 140.00 55.00 27.82 20.69 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 8,708.00 6.43 7.54 7.54 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 51,313.00 15.00 10.83 8.31 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 209,061.00 9.24 8.06 8.04 =============== 202-00226 Rem of Asph Mat (Special) Sq Yard ================================================ STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 3,464.00 10.00 9.99 6.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,464.00 10.00 9.99 6.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,464.00 10.00 9.99 6.30 =============== 202-00240 Rem Asphalt Mat (Planing) Sq Yard ================================================ STA0142-066 SH 14 New Raymer West 01/09/20 177,200.00 1.60 1.26 0.75 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 1,650.00 7.00 4.50 4.50 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 24 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00240 Rem Asphalt Mat (Planing) Sq Yard ================================================ NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 480,255.00 1.75 2.72 2.00 STA006A-067 SH 6 Merino to Atwood 01/16/20 136,413.00 2.25 1.25 0.60 STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 847.00 15.00 14.25 18.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 246,781.00 2.00 2.02 1.54 STR141A-044 SH 141 AND SH 145, FROM SLICK 01/30/20 108,716.00 2.50 2.21 1.40 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 91,710.00 3.75 7.93 6.91 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 2,609.00 5.00 6.82 6.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 5,437.00 3.00 6.13 5.25 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 15,500.00 10.00 3.53 5.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 13,561.00 2.50 3.89 4.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 14,831.00 10.00 3.42 4.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 235,201.00 1.85 2.95 1.85 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 2,051.00 5.00 6.75 7.80 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 6,694.00 15.00 6.40 4.65 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 951.00 31165.00 6.50 6.50 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 929.00 5.00 6.98 5.93 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 11,974.00 2.00 3.55 3.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 110,832.00 2.25 5.11 4.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,664,142.00 20.07 3.00 2.16 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 3,001.00 10.00 8.81 9.11 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 6,717.00 5.00 4.95 4.00 IM0761-226 I76/SH52 Interchange 04/02/20 1,181.00 7.00 8.83 7.71 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 537.00 8.00 12.37 9.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 2,377.00 2.50 19.93 23.80 C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 1,551.00 3.00 7.34 5.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 255.00 7.00 24.33 6.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 7,543.00 3.00 3.42 3.10 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 5,687.00 4.50 4.33 3.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 28,849.00 4.74 5.73 6.19 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 1,174.00 10.00 7.50 5.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 1,584.00 7.49 5.57 5.20 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 7,793.00 2.50 3.26 1.50 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 81,999.00 5.00 2.04 1.30 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 4,410.00 5.00 4.86 11.25 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 528.00 8.39 7.99 7.99 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 97,488.00 4.92 2.40 1.91 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,790,479.00 18.99 3.01 2.21 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 25 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00246 Rem Asphalt Mat (Planing)(Special) Sq Yard ================================================ NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 13,504.00 6.00 11.12 8.50 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 1,898.00 2.25 16.93 11.86 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 7,815.00 10.00 12.00 15.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 2,318.00 6.00 20.25 16.50 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 282.00 20.00 28.08 24.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 136.00 30.00 65.21 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 25,953.00 7.21 12.80 11.86 IM0761-226 I76/SH52 Interchange 04/02/20 1,287.00 10.00 16.39 9.01 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,287.00 10.00 16.39 9.01 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 6,336.00 7.00 3.76 1.70 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 4,126.00 10.00 16.62 2.35 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 750.00 10.00 31.65 18.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 411.00 7.00 27.82 8.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 11,623.00 8.26 11.78 3.21 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 38,863.00 7.61 12.55 9.17 =============== 202-00248 Rem Rumble Strips Lin Foot =============================================== C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 7,150.00 4.00 2.94 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7,150.00 4.00 2.94 3.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,150.00 4.00 2.94 3.00 =============== 202-00250 Rem Pavement Marking Sq Foot ================================================ FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 8,837.00 1.00 1.81 1.60 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 716.00 5.00 5.58 6.25 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 455.00 3.00 4.00 4.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 72,250.00 0.90 0.82 0.90 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 26 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00250 Rem Pavement Marking Sq Foot ================================================ BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 1,400.00 2.00 3.36 3.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 41,460.00 1.00 0.73 0.65 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 20,000.00 1.00 1.50 2.00 MTCER300-257 R3 FY 20/21 Region Wide Epoxy 02/06/20 1,438,746.00 0.52 0.53 0.30 FSA2873-194 US 287 Longmont Intersection 02/13/20 1,648.00 2.00 3.51 3.10 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 1,700.00 4.00 2.25 2.50 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 92,491.00 0.85 0.65 0.70 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 2,750.00 7.00 3.20 3.20 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 23,162.00 2.00 1.32 1.23 NHPP0502-082 US 50 MONTROSE RE CHIP SEAL 03/05/20 269,231.00 0.80 0.65 0.60 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 350.00 4.50 5.82 5.69 STRR300-249 Grand and Jackson Counties AD 03/05/20 1,116.00 3.50 9.33 3.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 27,458.00 2.00 2.42 2.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 57,618.00 0.75 0.88 0.90 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 14,458.00 0.66 3.23 3.40 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 4,500.00 1.00 3.03 3.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,080,346.00 0.66 0.70 0.50 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 124,203.00 0.75 0.73 0.75 IM0761-226 I76/SH52 Interchange 04/02/20 32,300.00 1.00 1.25 1.06 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 17.00 1.00 3.63 4.00 MTCER300-259 MTCE R3 FY20/21 Region Wide S 04/02/20 1,500.00 2.00 2.75 2.75 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 120,754.00 1.00 0.99 0.75 SFTY2254-091 225 Ramp Improvements 04/09/20 5,550.00 3.00 2.50 3.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 20,000.00 0.70 1.35 1.10 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 3,000.00 1.00 2.53 2.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 444.00 5.00 6.25 4.25 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 3,900.00 2.50 2.53 2.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 23,986.00 1.20 1.18 0.80 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 4,165.00 2.80 2.27 2.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 862.00 3.25 6.89 6.25 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 67,537.00 0.70 0.83 0.80 MTCE R100-341 Various Highways in Region 1 05/21/20 4,536,595.00 0.43 0.49 0.33 MTCER200-265 Pueblo 05/28/20 1,489,089.00 0.55 0.45 0.28 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 10,467.00 3.00 2.66 2.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6,444,369.00 0.49 0.54 0.36 MTCER400-381 REGION 4 FY21 EPOXY 07/02/20 2,621,293.00 0.55 0.49 0.45 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 27 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00250 Rem Pavement Marking Sq Foot ================================================ C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 621.00 3.00 5.88 3.00 STMM086-083 ADA PUEBLO METRO 07/09/20 320.00 1.00 16.50 15.00 MTCER300-258 MTCE R3 FY20 Region Roundabou 07/09/20 25,000.00 3.30 3.75 3.50 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 4,510.00 1.00 2.75 3.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 854.00 1.00 5.00 6.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 20.00 4.00 4.40 4.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 2,489.00 2.10 3.49 4.30 STM094A-038 SH94 WB PASSING LANE 09/01/20 30,185.00 0.93 0.93 0.93 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 1,673.00 7.00 3.33 2.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 106.00 5.00 11.15 5.27 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 88.00 1.00 6.86 5.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 28,840.00 2.00 1.06 1.75 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 4,700.00 1.00 3.27 3.15 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 480.00 8.00 3.53 2.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,721,179.00 0.60 0.54 0.52 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,245,894.00 0.55 0.56 0.42 =============== 202-00251 Rem Pvmt Marking (Asph Grooving) Sq Foot ================================================ NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 121,350.00 0.45 0.69 0.67 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 57,463.00 0.75 0.68 0.65 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 250.00 0.50 6.31 7.77 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 179,063.00 0.55 0.71 0.67 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 1,290.00 1.50 5.37 4.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 8,172.00 1.39 1.39 1.39 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9,462.00 1.40 3.48 1.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 188,525.00 0.59 0.82 0.73 =============== 202-00254 Rem of Pvmt Mkg (12 In) Sq Foot ================================================ NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 2,000.00 1.25 1.50 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,000.00 1.25 1.50 2.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 5,000.00 1.00 1.35 1.10 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 28 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00254 Rem of Pvmt Mkg (12 In) Sq Foot ================================================ FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,000.00 1.00 1.35 1.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,000.00 1.07 1.36 1.36 =============== 202-00256 Rem of Pvmt Mkg (15 In) Sq Foot ================================================ NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 1,000.00 1.25 1.50 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,000.00 1.25 1.50 2.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 2,500.00 1.25 1.35 1.10 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,500.00 1.25 1.35 1.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,500.00 1.25 1.36 1.36 =============== 202-00260 Rem of Pvmt Mkg (On-Call) Sq Foot ================================================ MTCER300-257 R3 FY 20/21 Region Wide Epoxy 02/06/20 74,000.00 0.65 0.66 0.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 74,000.00 0.65 0.66 0.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 74,000.00 0.65 0.66 0.42 =============== 202-00400 Rem Bridge Each =================================================== BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 2.00 28000.00 58166.67 75000.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 1.00 150000.00 72894.59 36379.49 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 68666.67 63592.74 62126.50 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 175000.00 72605.83 76998.50 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 29 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00400 Rem Bridge Each =================================================== FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 1.00 50000.00 71122.78 75000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 112500.00 71820.68 75999.25 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 2.00 90176.50 40825.75 45000.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 8.00 72578.13 75760.86 75760.86 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 76097.80 52470.79 69608.69 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15.00 79465.20 61475.21 68964.32 =============== 202-00425 Rem Bridge Railing Lin Foot =============================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 5,109.00 20.00 23.27 22.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 1,215.00 27.00 35.50 31.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 583.00 25.00 25.46 20.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 136.00 30.00 26.81 37.42 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 157.00 55.00 55.00 41.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7,200.00 22.54 26.16 24.06 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 280.00 20.00 19.80 10.60 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 164.00 31.44 47.60 47.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 444.00 24.23 22.27 24.27 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,644.00 22.64 25.84 24.07 =============== 202-00450 Rem Port Present Str (1) Sq Yard ================================================ IM0761-226 I76/SH52 Interchange 04/02/20 53.00 215.00 386.71 225.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 53.00 215.00 386.71 225.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 399.00 95.00 219.14 160.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 30 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00450 Rem Port Present Str (1) Sq Yard ================================================ STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 21.00 100.00 219.49 233.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 420.00 95.25 219.16 163.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 473.00 108.67 238.05 170.52 =============== 202-00453 Rem Port Present Str (2) Sq Yard ================================================ NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 220.00 291.00 384.76 352.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 33.00 350.00 583.53 567.06 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 483.00 350.00 357.50 350.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 188.00 300.00 345.00 340.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 5.00 300.00 392.22 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 929.00 325.64 371.24 356.43 IM0761-226 I76/SH52 Interchange 04/02/20 104.00 250.00 680.44 530.00 NHPPR100-251 SH 2/ Vasquez 06/25/20 35.00 280.00 622.50 985.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 139.00 257.55 675.35 644.57 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 126.00 185.00 458.71 550.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 21.00 150.00 319.36 321.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 40.00 408.51 685.06 685.06 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 187.00 228.88 450.60 553.17 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,255.00 303.68 454.28 417.66 =============== 202-00460 Rem Port Present Str (3) Sq Yard ================================================ NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 6.00 498.00 1251.82 1111.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 3.00 500.00 1356.32 1312.63 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 33.00 550.00 850.00 1000.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 37.00 475.00 890.00 880.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 79.00 509.03 930.67 964.10 NHPPR100-251 SH 2/ Vasquez 06/25/20 2.00 480.00 1348.35 2139.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 480.00 1348.35 2139.70 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 31 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00460 Rem Port Present Str (3) Sq Yard ================================================ BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 21.00 340.00 931.57 700.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 4.00 300.00 675.37 577.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 8.00 1246.52 1316.77 1316.77 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 33.00 554.91 914.44 834.61 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 114.00 521.80 927.11 947.24 =============== 202-00495 Rem Port Present Str LUMP SUM =============================================== NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 1.00 15000.00 12807.36 5750.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1.00 10000.00 17412.50 11000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 12500.00 15877.45 8375.00 IM0761-226 I76/SH52 Interchange 04/02/20 1.00 120000.00 257771.43 130000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 120000.00 257771.43 130000.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 70044.01 111373.05 111373.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 70044.01 111373.05 111373.05 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 53761.00 105315.12 64530.76 =============== 202-00500 Rem Port Present Str Each =================================================== STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 4.00 2300.00 5950.00 5900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 2300.00 5950.00 5900.00 SFTY2254-091 225 Ramp Improvements 04/09/20 1.00 5000.00 3200.00 4900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 5000.00 3200.00 4900.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 32 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00500 Rem Port Present Str Each =================================================== STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 1.00 1591.00 1125.00 1900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1591.00 1125.00 1900.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 2631.83 4413.46 5066.67 =============== 202-00502 Rem Port Present Str Cubic Yard ============================================= NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 8.00 1350.00 1239.71 1805.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 1350.00 1239.71 1805.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 1350.00 1239.71 1805.00 =============== 202-00503 Rem Port Present Str Sq Yard ================================================ BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 556.00 720.00 192.71 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 556.00 720.00 192.71 65.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 556.00 720.00 192.71 65.00 =============== 202-00504 Rem Exp Device Lin Foot =============================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 88.00 170.00 128.21 73.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 618.00 250.00 327.50 490.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 141.00 175.00 143.50 127.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 847.00 229.20 268.86 386.25 NHPPR100-251 SH 2/ Vasquez 06/25/20 648.00 200.00 149.15 125.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 648.00 200.00 149.15 125.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,495.00 216.55 218.45 273.14 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 33 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00505 Rem Port of Present Structure Sq Foot ================================================ NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 22.00 150.00 282.43 367.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 2,869.00 175.00 48.35 50.34 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 40.00 230.00 284.50 269.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,931.00 175.56 54.18 55.70 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 442.00 74.88 85.61 85.61 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 442.00 74.88 85.61 85.61 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,373.00 162.37 56.38 59.62 =============== 202-00700 Rem Light Standard Each =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 2.00 500.00 750.00 750.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 15.00 500.00 510.00 490.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1.00 580.00 888.00 896.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 18.00 504.44 535.22 541.44 IM0761-226 I76/SH52 Interchange 04/02/20 14.00 375.00 694.70 699.60 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 800.00 287.06 275.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 2.00 2000.00 2140.00 2140.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 1.00 800.00 1130.40 835.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 18.00 602.78 710.70 843.58 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 3.00 400.00 819.14 750.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 17.00 750.00 425.28 411.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 1.00 600.00 873.67 700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 21.00 692.86 501.60 473.19 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 57.00 604.91 589.36 611.71 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 34 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00705 Rem Light Standard Foundation Each =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 2.00 550.00 650.00 650.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 15.00 700.00 913.33 880.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1.00 610.00 1067.00 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 18.00 678.33 908.86 866.67 SFTY2254-091 225 Ramp Improvements 04/09/20 3.00 1000.00 710.00 700.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 900.00 654.29 533.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 975.00 678.17 658.38 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 17.00 800.00 456.98 415.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 17.00 800.00 456.98 415.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 39.00 761.79 609.94 648.42 =============== 202-00710 Rem Power Pole Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 1.00 1500.00 7473.33 3910.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1500.00 7473.33 3910.00 IM0761-226 I76/SH52 Interchange 04/02/20 2.00 2000.00 564.70 657.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 2000.00 564.70 657.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 1833.33 1783.87 1741.47 =============== 202-00725 Rem Ex Lighting Sys LUMP SUM =============================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1.00 15000.00 2875.00 2800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 15000.00 2875.00 2800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 15000.00 2875.00 2800.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 35 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00750 Rem Luminaire Each =================================================== NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 3.00 100.00 543.33 740.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 614.00 130.00 81.87 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 617.00 129.85 83.55 127.99 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 3.00 200.00 82.00 75.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 26.00 100.00 116.31 84.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 29.00 110.34 112.24 83.61 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 646.00 128.98 85.47 126.00 =============== 202-00805 Rem Overhead Sign Str Each =================================================== HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 2.00 5000.00 5937.50 7635.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 5000.00 5937.50 7635.00 SFTY2254-091 225 Ramp Improvements 04/09/20 1.00 10000.00 6825.00 6650.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 10000.00 6825.00 6650.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 6666.67 6233.33 7306.67 =============== 202-00810 Rem Ground Sign Each =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 2.00 200.00 161.79 155.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 7.00 80.00 200.00 200.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 73.00 60.00 79.51 85.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 6.00 68.00 121.34 125.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 22.00 100.00 102.51 105.01 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 4.00 200.00 200.00 200.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 15.00 60.00 143.74 132.48 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 20.00 125.00 126.00 102.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 109.00 85.00 154.58 150.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 36 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00810 Rem Ground Sign Each =================================================== FSA2873-194 US 287 Longmont Intersection 02/13/20 1.00 400.00 168.33 165.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 156.00 65.00 84.31 100.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 98.00 75.00 111.01 100.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 1.00 150.00 375.00 500.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 180.00 88.50 102.29 114.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 13.00 200.00 151.67 153.01 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 5.00 150.00 150.00 150.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 3.00 100.00 156.28 175.50 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 14.00 200.00 100.00 91.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 57.00 80.00 69.27 76.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 9.00 200.00 147.00 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 795.00 85.78 103.94 110.43 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 1.00 175.00 175.40 167.84 IM0761-226 I76/SH52 Interchange 04/02/20 79.00 70.00 135.43 159.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 1.00 100.00 402.00 1000.00 SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 495.00 150.00 100.00 100.00 SFTY2254-091 225 Ramp Improvements 04/09/20 4.00 150.00 222.50 215.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 30.00 200.00 121.92 110.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 5.00 70.00 192.67 125.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 3.00 150.00 413.33 815.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 21.00 50.00 226.67 215.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 5.00 100.00 110.38 113.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 1.00 100.00 253.33 350.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 13.00 468.00 259.49 259.49 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 9.00 200.00 2000.00 2500.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 6.00 110.00 141.23 98.17 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 673.00 145.10 151.94 152.08 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 1.00 150.00 335.19 500.00 STMM086-083 ADA PUEBLO METRO 07/09/20 72.00 80.00 275.00 150.00 MTCER300-255 MTCE R3 FY20/21 Signal Replac 07/09/20 299.00 50.00 91.25 50.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 15.00 70.00 137.50 190.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 2.00 200.00 135.00 115.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 8.00 109.87 78.05 34.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 7.00 80.25 80.25 80.25 MTCE0702-386 Grand Junction 09/03/20 71.00 250.00 86.67 50.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 62.00 75.00 66.33 58.70 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 28.00 340.00 114.27 136.80 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 37 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00810 Rem Ground Sign Each =================================================== SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 534.00 175.00 262.50 350.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 8.00 125.00 159.67 50.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 13.00 150.00 162.94 162.94 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,120.00 135.78 153.55 205.89 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,588.00 122.84 136.46 162.57 =============== 202-00815 Rem of Sign (Special) Each =================================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 5.00 1000.00 1001.67 530.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 1000.00 1001.67 530.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 1.00 1000.00 7139.33 8440.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 1000.00 7139.33 8440.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 1000.00 2024.61 1848.33 =============== 202-00821 Rem Sign Panel Each =================================================== STA0142-066 SH 14 New Raymer West 01/09/20 38.00 80.00 39.00 26.00 FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 6.00 40.00 657.23 510.00 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 60.00 50.00 84.00 90.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 2.00 30.00 110.00 110.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 223.00 30.00 69.13 68.26 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 8.00 100.00 135.00 120.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 17.00 60.00 102.18 99.36 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 37.00 39.20 150.32 200.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 1.00 60.00 181.67 275.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 4.00 30.00 84.31 100.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 55.00 75.00 46.59 65.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 88.00 60.00 61.46 51.35 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 58.00 30.00 47.93 40.80 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 63.00 80.00 66.00 66.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 4.00 40.00 93.00 90.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 17.00 70.00 234.40 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 681.00 49.95 83.77 77.04 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 85.00 110.00 82.58 108.29 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 38 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00821 Rem Sign Panel Each =================================================== SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 366.00 65.00 50.00 50.00 C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 1.00 53.00 140.33 70.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 2.00 50.00 71.00 70.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 454.00 73.33 63.82 61.05 MTCER300-255 MTCE R3 FY20/21 Signal Replac 07/09/20 2,862.00 30.00 29.00 6.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 4.00 65.00 55.00 75.00 MTCE0702-386 Grand Junction 09/03/20 310.00 50.00 68.33 30.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 10.00 50.00 53.19 41.10 SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 224.00 65.00 192.50 300.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 4.00 50.00 54.31 54.31 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,414.00 34.24 37.65 27.71 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,549.00 40.49 43.97 38.42 =============== 202-00825 Rem Flashing Beacon Each =================================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 4.00 50.00 416.01 402.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 50.00 416.01 402.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 50.00 416.01 402.00 =============== 202-00827 Rem of Pull Box Each =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 2.00 200.00 350.00 350.00 STRR300-249 Grand and Jackson Counties AD 03/05/20 8.00 300.00 431.00 300.00 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 4.00 300.00 451.37 200.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 12.00 200.00 685.00 660.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1.00 350.00 249.17 260.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 27.00 250.00 522.32 447.41 IM0761-226 I76/SH52 Interchange 04/02/20 4.00 1000.00 138.69 104.94 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 18.00 350.00 326.67 195.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 5.00 150.00 247.00 220.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 39 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00827 Rem of Pull Box Each =================================================== NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 2.00 180.00 277.67 600.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 10.00 482.00 481.50 481.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 39.00 416.15 280.61 283.20 STMM086-083 ADA PUEBLO METRO 07/09/20 1.00 300.00 637.50 575.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 9.00 400.00 360.00 200.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 106.00 550.00 543.00 385.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 36.00 650.00 686.19 647.97 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 7.00 260.00 278.20 278.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 159.00 549.81 565.50 430.56 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 225.00 490.67 531.34 407.04 =============== 202-00828 Rem Traf Sig Equipment LUMP SUM =============================================== C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 1.00 15000.00 15000.00 10000.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1.00 30000.00 20783.33 20000.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1.00 6000.00 12621.25 11000.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1.00 8000.00 5014.00 5152.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1.00 12000.00 24136.00 22200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 14200.00 16201.40 13670.40 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 12000.00 6241.34 6077.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 1.00 15000.00 24954.12 20585.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 1.00 27500.00 34698.33 45295.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 1.00 10000.00 19395.00 8885.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 1.00 15000.00 17626.00 21656.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 15900.00 17054.68 20499.70 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 1.00 50000.00 33000.00 31000.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 1.00 18000.00 11775.00 7500.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1.00 15000.00 7270.00 6600.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 40 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00828 Rem Traf Sig Equipment LUMP SUM =============================================== STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 1.00 12000.00 8960.33 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 23750.00 11939.73 12025.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 17535.71 15409.25 15639.32 =============== 202-00830 Rem Traf Sig Face Each =================================================== C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 1.00 250.00 241.61 158.04 SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 3.00 75.00 1750.00 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 118.75 1064.37 2289.51 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 118.75 1064.37 2289.51 =============== 202-00831 Rem Traf Sig Head Each =================================================== FSA2873-194 US 287 Longmont Intersection 02/13/20 2.00 125.00 259.17 95.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 3.00 115.00 244.50 247.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 119.00 254.28 186.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 119.00 254.28 186.20 =============== 202-00832 Rem of Sign Panel (Spec) Each =================================================== SFTY2254-091 225 Ramp Improvements 04/09/20 3.00 3500.00 597.50 580.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 3500.00 597.50 580.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 3500.00 597.50 580.00 =============== 202-00840 Rem Traf Sig Pole Each =================================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 2.00 1000.00 2550.00 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1000.00 2550.00 2500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1000.00 2550.00 2500.00 =============== 202-00858 Rem Pedestal Pole Each =================================================== SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 3.00 1100.00 570.13 495.67 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 1100.00 570.13 495.67 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 41 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00858 Rem Pedestal Pole Each =================================================== C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 1.00 550.00 594.80 431.98 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 550.00 594.80 431.98 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 962.50 576.30 479.75 =============== 202-00860 Rem Ped Push Button Each =================================================== C1601-082 Hawkins Signal and Curb Ramps 04/30/20 32.00 75.00 566.67 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 32.00 75.00 566.67 100.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 30.00 100.00 98.00 110.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 21.00 120.00 113.00 79.02 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 51.00 108.24 103.53 97.24 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 83.00 95.42 220.22 98.31 =============== 202-00889 Rem of Detect Warning Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 30.00 400.00 351.00 288.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 30.00 400.00 351.00 288.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 400.00 351.00 288.00 =============== 202-00890 Rem Span Wire Cable Lin Foot =============================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 64.00 5.00 11.33 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 64.00 5.00 11.33 11.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 64.00 5.00 11.33 11.00 =============== 202-00895 Rem of Impact Attenuator Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 2.00 1101.00 2902.67 6238.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 42 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00895 Rem of Impact Attenuator Each =================================================== STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 1.00 2500.00 1667.59 1720.18 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 1567.33 2593.90 4732.06 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 1567.33 2593.90 4732.06 =============== 202-00900 Rem Conc Footing Each =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 2.00 500.00 1500.00 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 500.00 1500.00 1500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 500.00 1500.00 1500.00 =============== 202-01000 Rem Fence Lin Foot =============================================== BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 268.00 3.00 3.66 4.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 790.00 2.00 2.65 2.60 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 2,219.00 1.75 2.72 0.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,277.00 1.91 2.78 1.56 IM0761-226 I76/SH52 Interchange 04/02/20 76.00 2.00 3.39 3.07 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 806.00 3.00 4.35 5.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 11,365.00 2.00 0.67 0.77 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 332.00 6.00 8.67 3.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 4,142.00 1.00 0.92 0.92 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 200.00 2.00 8.59 1.25 NH050A-037 US 50A Pueblo Regional Pond -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16,921.00 1.88 0.99 1.07 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 160.00 2.00 13.00 15.00 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 28.00 10.00 33.00 30.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 2,281.00 2.13 2.95 2.50 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 335.00 5.00 6.63 8.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 43 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01000 Rem Fence Lin Foot =============================================== STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 500.00 2.00 4.92 5.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 17,602.00 0.60 0.66 0.55 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 2,118.00 1.25 1.36 1.36 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 23,024.00 0.93 1.19 1.16 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 43,222.00 1.38 1.24 1.15 =============== 202-01030 Rem of Road Closure Gate Each =================================================== STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 1.00 1500.00 929.92 816.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1500.00 929.92 816.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1500.00 929.92 816.00 =============== 202-01035 Rem of Gate Each =================================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1.00 200.00 301.02 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 200.00 301.02 200.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 2.00 128.00 130.36 130.36 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 128.00 130.36 130.36 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 1.00 300.00 290.51 263.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 300.00 290.51 263.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 189.00 276.62 180.96 =============== 202-01130 Rem Gdrail Ty 3 Lin Foot =============================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 22,112.00 5.00 4.80 4.50 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 753.00 5.00 6.29 4.85 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 44 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01130 Rem Gdrail Ty 3 Lin Foot =============================================== FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 4,965.00 6.00 3.48 3.30 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 23,906.00 10.00 5.55 7.09 STR141A-044 SH 141 AND SH 145, FROM SLICK 01/30/20 5,743.00 4.00 3.94 3.80 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 505.00 12.00 6.30 6.49 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 675.00 10.00 9.00 8.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 1,900.00 6.00 6.99 9.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 5,575.00 4.50 7.99 8.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 1,163.00 10.00 8.38 5.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 3,134.00 3.20 3.98 4.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 988.00 8.00 6.23 9.49 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 1,862.50 6.00 3.20 3.30 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 50.00 15.00 11.50 11.50 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 344.00 4.50 8.69 5.18 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 470.00 4.50 3.36 2.25 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 69.00 10.00 23.28 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 74,214.50 6.75 5.14 5.65 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 8,366.00 6.00 7.77 7.04 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 4,871.00 5.00 4.93 4.25 IM0761-226 I76/SH52 Interchange 04/02/20 906.00 7.00 2.82 2.70 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 3,538.00 5.00 4.29 2.65 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 1,103.00 5.00 4.09 3.17 SFTY2254-091 225 Ramp Improvements 04/09/20 1,152.00 20.00 3.75 3.50 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 2,899.00 3.50 3.53 3.52 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 172.00 10.00 24.17 27.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 676.00 5.00 5.91 8.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 375.00 3.00 3.37 3.37 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 775.00 14.00 10.75 11.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 24,833.00 6.22 5.32 5.21 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1,217.00 3.50 3.76 3.50 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 1,075.00 5.00 3.88 4.70 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 1,150.00 4.00 3.79 3.60 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1,533.00 5.00 3.58 3.58 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,975.00 4.40 3.79 3.81 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 104,022.50 6.51 5.09 5.46 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 45 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01170 Rem Gdrail Ty 7 Lin Foot =============================================== NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 300.00 10.00 36.91 33.82 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 347.00 50.00 16.50 18.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 165.00 65.00 70.40 37.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 812.00 38.27 39.50 27.71 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 50.00 30.00 90.00 28.00 IM0761-226 I76/SH52 Interchange 04/02/20 350.00 11.00 25.54 18.99 SFTY2254-091 225 Ramp Improvements 04/09/20 1,068.00 70.00 24.50 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,468.00 54.57 26.44 23.67 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 52.00 28.00 88.00 115.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 328.00 5.00 26.39 26.39 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 380.00 8.15 41.22 38.52 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,660.00 42.96 31.53 27.02 =============== 202-01175 Rem of Guardrail (Spec) Lin Foot =============================================== NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 50.00 27.00 67.50 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 50.00 27.00 67.50 100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 27.00 67.50 100.00 =============== 202-01180 Rem Median Barrier Lin Foot =============================================== NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 112.00 75.00 75.00 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 112.00 75.00 75.00 90.00 SFTY2254-091 225 Ramp Improvements 04/09/20 32.00 50.00 59.50 85.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 32.00 50.00 59.50 85.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 144.00 69.44 71.56 88.89 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 46 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01200 Rem Tensioned Cable Barrier Lin Foot =============================================== IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 1,262.00 5.00 5.09 3.17 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,262.00 5.00 5.09 3.17 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,262.00 5.00 5.09 3.17 =============== 202-01300 Rem End Anchorage Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 52.00 324.00 311.00 380.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 8.00 400.00 446.06 300.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 12.00 300.00 347.50 330.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 72.00 400.00 151.98 103.96 STR141A-044 SH 141 AND SH 145, FROM SLICK 01/30/20 22.00 350.00 381.93 395.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 4.00 300.00 427.00 354.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 51.00 300.00 380.67 400.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 6.00 375.00 284.91 210.00 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 10.00 300.00 622.50 1025.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 2.00 400.00 550.00 550.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 1.00 300.00 654.97 625.21 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 5.00 300.00 404.22 340.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 245.00 344.89 329.66 322.64 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 29.00 350.00 463.08 308.62 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 24.00 200.00 332.50 400.00 IM0761-226 I76/SH52 Interchange 04/02/20 9.00 250.00 239.55 233.20 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 22.00 400.00 412.38 220.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 11.00 300.00 444.45 388.89 SFTY2254-091 225 Ramp Improvements 04/09/20 3.00 300.00 277.50 270.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 12.00 350.00 286.53 242.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 4.00 350.00 1002.67 893.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 4.00 400.00 379.20 500.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 2.00 241.00 244.42 244.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 120.00 315.68 375.54 329.51 STR184B-006 CULVERTS SH 184 08/06/20 2.00 400.00 350.00 350.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 47 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01300 Rem End Anchorage Each =================================================== SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 2.00 350.00 246.14 230.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 6.00 300.00 384.23 411.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 2.00 400.00 356.27 342.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 15.00 300.00 238.98 238.98 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 27.00 318.52 327.79 292.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 392.00 334.13 346.84 322.66 =============== 202-04001 Plug Culvert Each =================================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 16.00 4000.00 2788.59 4300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16.00 4000.00 2788.59 4300.00 IM0761-226 I76/SH52 Interchange 04/02/20 2.00 3000.00 1220.30 472.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 3000.00 1220.30 472.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 1.00 2500.00 5217.07 9174.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 2500.00 5217.07 9174.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19.00 3815.79 2755.32 4153.59 =============== 202-04002 Clean Culvert Each =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 8.00 1500.00 3000.00 3000.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 82.00 1650.00 2132.98 2668.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 2.00 1750.00 2221.53 2000.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 75.00 364.00 930.86 595.06 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 2.00 1000.00 2280.00 950.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 14.00 3000.00 2813.08 3939.23 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1.00 2400.00 3083.13 2700.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1.00 1500.00 2519.43 3622.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 16.00 3000.00 1636.00 1350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 201.00 1363.18 1821.74 1872.52 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 48 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-04002 Clean Culvert Each =================================================== IM0761-226 I76/SH52 Interchange 04/02/20 9.00 2000.00 2098.88 582.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 13.00 1500.00 2287.50 1875.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 1.00 3000.00 6050.00 2200.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 2.00 3500.00 2558.00 1190.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 1.00 2000.00 1934.25 690.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 26.00 1903.85 2270.53 1341.65 STR184B-006 CULVERTS SH 184 08/06/20 5.00 5000.00 4900.00 4900.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 1.00 2567.45 2562.15 1860.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 3.00 2000.00 1731.43 3000.00 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 5.00 2000.00 2817.00 5000.00 CR400-374 FY 20 Culvert Prioritization 09/17/20 3.00 1000.00 5281.75 2400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 17.00 2739.26 3030.47 3974.12 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 244.00 1516.67 2003.23 1962.38 =============== 202-04004 Plug Culvert (Spec) Each =================================================== NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 2.00 3000.00 4400.00 4400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 3000.00 4400.00 4400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 3000.00 4400.00 4400.00 =============== 202-04005 Clean Valve Box Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 45.00 277.00 625.09 400.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 2.00 300.00 900.00 900.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 2.00 150.00 510.00 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 49.00 272.76 624.74 414.29 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 2.00 200.00 358.00 535.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 49 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-04005 Clean Valve Box Each =================================================== FSAC010-124 US 40, US 287, SH 88 08/06/20 2.00 300.00 435.00 325.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 15.00 500.00 315.50 53.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 4.00 300.00 550.57 697.87 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 2.00 250.00 426.71 620.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 25.00 408.00 368.36 261.86 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 74.00 318.45 500.54 362.79 =============== 202-04006 Clean Culvert Hour =================================================== NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 10.00 300.00 475.50 475.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 300.00 475.50 475.50 STM094A-038 SH94 WB PASSING LANE 09/01/20 8.00 593.58 593.58 593.58 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 10.00 312.00 423.59 423.59 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 18.00 437.15 499.14 499.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 28.00 388.17 490.70 490.70 =============== 202-04008 Clean Culvert Lin Foot =============================================== STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 645.00 26.00 65.00 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 645.00 26.00 65.00 65.00 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 554.00 35.00 59.00 68.00 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 122.00 65.00 49.75 45.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 501.00 65.00 107.50 85.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,177.00 50.88 74.94 72.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,822.00 42.07 73.13 70.07 =============== 202-04010 Clean Inlet Each =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 7.00 900.00 847.18 205.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 50 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-04010 Clean Inlet Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 4.00 328.00 1302.28 1112.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 77.00 600.00 900.00 800.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 18.00 850.00 2588.01 3346.01 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 5.00 300.00 1074.00 950.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 111.00 636.14 1177.57 1193.34 IM0761-226 I76/SH52 Interchange 04/02/20 6.00 1500.00 608.44 770.00 SFTY2254-091 225 Ramp Improvements 04/09/20 14.00 1250.00 1117.50 1125.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 8.00 2000.00 1792.57 412.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 3.00 550.00 1292.00 800.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 4.00 1500.00 2080.00 1240.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 1.00 1500.00 1647.67 368.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 10.00 1200.00 991.67 800.00 NHPPR100-251 SH 2/ Vasquez 06/25/20 1.00 1000.00 1798.85 1748.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 47.00 1375.53 1297.09 875.46 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 23.00 1000.00 930.00 960.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 6.00 320.00 1077.86 300.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 67.00 1000.00 427.50 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 96.00 957.50 530.42 388.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 254.00 894.42 860.33 830.27 =============== 202-04050 Clean Exp Joint Lin Foot =============================================== BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 509.00 20.00 22.71 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 509.00 20.00 22.71 10.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 509.00 20.00 22.71 10.00 =============== 202-04100 Abandon Well Each =================================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 2.00 2000.00 2198.33 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 2000.00 2198.33 3000.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 51 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-04100 Abandon Well Each =================================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 3000.00 4509.34 2750.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 3000.00 4509.34 2750.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 2333.33 3518.91 2916.67 =============== 202-05010 Sawing Concrete (10 In) Lin Foot =============================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 200.00 6.50 10.15 5.21 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 200.00 6.50 10.15 5.21 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 200.00 6.50 10.15 5.21 =============== 202-05026 Sawing Asphalt Mat (6 In) Lin Foot =============================================== SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 682.00 6.00 6.25 3.47 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 682.00 6.00 6.25 3.47 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 862.00 10.00 10.69 6.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 500.00 9.00 6.64 11.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,362.00 9.63 9.46 7.91 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,044.00 8.42 8.15 6.43 =============== 202-05030 Sawing Asphalt Mat (10 In) Lin Foot =============================================== BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 676.00 4.00 7.41 6.32 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 676.00 4.00 7.41 6.32 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 676.00 4.00 7.41 6.32 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 52 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-05100 Sandblasting Reinf Steel Sq Yard ================================================ STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 158.00 75.00 47.07 49.02 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 158.00 75.00 47.07 49.02 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 158.00 75.00 47.07 49.02 =============== 202-06530 Clean Drain Pipe (Spec) Each =================================================== STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 16.00 125.00 409.50 113.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16.00 125.00 409.50 113.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 125.00 409.50 113.00 =============== 202-07000 Oblit Old Road LUMP SUM =============================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1.00 10000.00 10958.33 10800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 10000.00 10958.33 10800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 10000.00 10958.33 10800.00 =============== 203-00000 Uncl Excav Cubic Yard ============================================= STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 2,260.00 18.00 23.50 22.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 657.00 9.00 26.79 26.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 2,523.00 50.00 39.54 40.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 15.00 250.00 153.35 175.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 131.00 100.00 23.00 23.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 9,971.00 15.00 15.67 14.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1,430.00 25.00 33.93 27.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16,987.00 22.07 18.70 20.74 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 100.00 20.00 62.50 70.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 100.00 20.00 62.50 70.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 53 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00000 Uncl Excav Cubic Yard ============================================= C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 2,145.00 37.50 64.38 85.00 STMM086-083 ADA PUEBLO METRO 07/09/20 51.00 100.00 69.00 48.00 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 370.00 32.00 23.49 22.42 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 15,816.00 13.97 13.94 13.94 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 18,382.00 17.32 31.14 22.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 35,469.00 19.60 21.51 21.79 =============== 203-00010 Uncl Excav (CIP) Cubic Yard ============================================= FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 725.00 25.00 41.80 30.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 625.00 50.00 36.00 36.00 PWQM240-172 El Paso County, north Colorad 01/23/20 1,297.00 20.00 53.75 98.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 674.00 88.00 42.15 36.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 2,282.00 27.00 34.09 24.20 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 14,547.00 20.00 13.34 9.75 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 643.00 30.00 24.82 15.64 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 7,292.00 25.00 33.05 33.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 28,085.00 24.52 26.48 22.91 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 1,656.00 22.00 25.37 31.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 6,877.00 23.00 39.38 43.75 SFTY2254-091 225 Ramp Improvements 04/09/20 6,310.00 45.00 43.00 47.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 623,574.00 10.00 9.55 8.05 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1601-082 Hawkins Signal and Curb Ramps 04/30/20 336.00 50.00 96.33 192.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 2,722.00 30.00 59.33 40.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 1,547.00 30.00 30.77 35.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 148,836.00 7.00 8.34 8.34 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 51,984.00 12.00 16.66 8.30 NH050A-037 US 50A Pueblo Regional Pond -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 843,842.00 10.10 10.34 8.97 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 445.00 45.00 55.00 60.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 54 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00010 Uncl Excav (CIP) Cubic Yard ============================================= SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 8.00 25.00 325.00 400.00 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 2,584.00 25.00 33.93 17.65 FSAC010-124 US 40, US 287, SH 88 08/06/20 85.00 25.00 100.67 97.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 1,522.00 45.19 31.12 19.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 6,250.00 21.43 21.43 21.43 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 14,362.00 12.00 20.49 15.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 25,256.00 18.29 23.44 18.44 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 897,183.00 10.78 10.86 9.67 =============== 203-00040 Uncl Excav (Spec) Cubic Yard ============================================= C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 273.00 75.00 33.97 11.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 273.00 75.00 33.97 11.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 273.00 75.00 33.97 11.50 =============== 203-00050 Unsuitable Material Cubic Yard ============================================= NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 1,419.00 30.00 28.00 35.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 50.00 55.00 91.38 100.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC PWQM240-172 El Paso County, north Colorad 01/23/20 260.00 40.00 49.50 48.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 1,479.00 20.00 26.75 15.50 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 100.00 50.00 73.26 79.79 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 35.00 100.00 96.00 96.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 200.00 40.00 72.60 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,543.00 28.73 37.29 32.01 IM0761-226 I76/SH52 Interchange 04/02/20 1,000.00 35.00 24.90 40.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 545.00 35.00 108.00 84.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 20.00 65.00 77.25 13.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 100.00 80.00 49.42 25.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 50.00 64.00 64.50 64.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,715.00 38.82 42.17 53.51 FSAC010-124 US 40, US 287, SH 88 08/06/20 15.00 55.00 143.33 250.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 55 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00050 Unsuitable Material Cubic Yard ============================================= C R100-288 R1 CURB RAMPS - PH 2 09/03/20 500.00 50.00 59.03 30.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 550.00 60.00 53.56 29.80 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 100.00 40.00 42.57 34.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,165.00 53.93 55.53 33.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,423.00 36.00 43.77 37.95 =============== 203-00060 Emb Matl (CIP) Cubic Yard ============================================= NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 4,704.00 18.00 69.07 39.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 1,840.00 27.00 68.67 55.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 250.00 50.00 58.80 51.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 8,647.00 40.00 49.00 48.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 497.00 80.00 36.77 40.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 2,181.00 14.00 36.29 45.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 153,686.00 20.00 24.36 20.84 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 592.00 20.00 49.11 60.29 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 13,669.00 15.00 32.62 30.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 192,375.00 15.00 19.28 17.50 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1,732.00 35.00 78.60 56.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 380,173.00 17.89 21.87 20.89 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 585.00 25.00 72.35 58.00 IM0761-226 I76/SH52 Interchange 04/02/20 58,002.00 17.00 22.55 17.35 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 9,589.00 22.00 28.47 18.50 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 16.00 75.00 137.50 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 68,192.00 17.79 23.62 17.86 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 763.00 15.00 24.34 26.11 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 209.00 35.00 69.75 52.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 344.00 30.00 62.50 50.00 STR184B-006 CULVERTS SH 184 08/06/20 27.00 180.00 170.00 170.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 5,300.00 45.00 34.08 25.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 11,840.00 10.00 19.11 14.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 18,483.00 21.15 24.68 19.24 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 466,848.00 18.00 22.30 20.38 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 56 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00062 Emb Matl (CIP) (Spec) Cubic Yard ============================================= NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 1,419.00 30.00 39.63 39.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,419.00 30.00 39.63 39.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,419.00 30.00 39.63 39.00 =============== 203-00066 Emb Matl (CIP) (R40) Cubic Yard ============================================= FSA2873-194 US 287 Longmont Intersection 02/13/20 761.00 50.00 64.37 87.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 27,336.00 20.00 24.56 18.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 28,097.00 20.81 25.38 20.36 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 28,097.00 20.81 25.38 20.36 =============== 203-00100 Muck Excav Cubic Yard ============================================= NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 100.00 35.00 40.50 49.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 100.00 35.00 40.50 49.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 200.00 30.00 38.19 40.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 200.00 30.00 38.19 40.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 300.00 31.67 38.56 43.00 =============== 203-00400 Rock Excav Cubic Yard ============================================= NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 15.00 100.00 293.70 275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15.00 100.00 293.70 275.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 3,500.00 60.00 40.74 20.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 57 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00400 Rock Excav Cubic Yard ============================================= FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,500.00 60.00 40.74 20.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,515.00 60.17 41.28 21.09 =============== 203-00450 Rem Rock Each =================================================== IM0761-226 I76/SH52 Interchange 04/02/20 7.00 12.00 262.69 115.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7.00 12.00 262.69 115.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 12.00 262.69 115.00 =============== 203-00592 Rock Staining Sq Foot ================================================ C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 18,178.00 2.50 3.70 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 18,178.00 2.50 3.70 2.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18,178.00 2.50 3.70 2.00 =============== 203-01100 Proof Rolling Hour =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 90.00 128.00 104.67 89.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 10.00 100.00 73.88 90.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 5.00 100.00 163.00 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 105.00 124.00 107.34 91.52 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 30.00 100.00 191.94 110.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 12.00 150.00 119.67 112.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 20.00 127.00 136.10 136.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 62.00 118.39 179.37 118.81 STM094A-038 SH94 WB PASSING LANE 09/01/20 40.00 112.66 112.66 112.66 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 58 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01100 Proof Rolling Hour =================================================== STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 10.00 100.00 106.13 98.60 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 100.00 118.67 129.71 129.71 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 150.00 115.82 119.23 123.09 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 317.00 119.03 136.56 111.80 =============== 203-01140 Rolling Hour =================================================== NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 70.00 100.00 106.67 100.01 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 20.00 125.00 82.00 82.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 90.00 105.56 104.52 96.01 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 40.00 150.00 100.30 123.28 SFTY2254-091 225 Ramp Improvements 04/09/20 10.00 200.00 137.50 155.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 16.00 90.00 126.67 119.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 66.00 143.03 110.99 127.05 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 156.00 121.41 107.43 109.14 =============== 203-01500 Blading Hour =================================================== STA0142-066 SH 14 New Raymer West 01/09/20 100.00 143.00 153.75 105.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 10.00 150.00 110.00 110.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 90.00 140.00 191.10 190.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 50.00 150.00 144.41 130.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STA006A-067 SH 6 Merino to Atwood 01/16/20 200.00 160.00 120.01 100.00 PWQM240-172 El Paso County, north Colorad 01/23/20 8.00 150.00 271.50 333.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 10.00 150.00 159.60 108.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 110.00 150.00 144.19 140.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 40.00 145.00 152.70 135.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 100.00 150.00 109.29 125.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 90.00 150.00 115.00 110.01 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 20.00 180.00 107.00 95.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 20.00 125.00 93.00 93.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 50.00 150.00 77.33 90.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 20.00 155.00 155.62 154.34 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 40.00 150.00 168.33 230.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 59 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01500 Blading Hour =================================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 104.00 150.00 165.63 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,062.00 150.38 145.50 130.22 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 40.00 150.00 117.12 117.87 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 20.00 140.00 130.50 120.00 IM0761-226 I76/SH52 Interchange 04/02/20 40.00 150.00 144.20 105.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 20.00 150.00 96.67 30.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 40.00 150.00 134.37 119.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 30.00 100.00 90.00 100.00 SFTY2254-091 225 Ramp Improvements 04/09/20 30.00 200.00 172.50 175.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 100.00 175.00 176.96 130.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 16.00 180.00 169.00 159.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 40.00 150.00 149.75 115.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 25.00 150.00 136.19 110.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 40.00 214.00 237.53 237.53 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 50.00 160.00 137.38 150.00 NH050A-037 US 50A Pueblo Regional Pond -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 491.00 161.89 151.32 132.02 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 24.00 150.00 259.88 300.00 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 40.00 160.00 173.11 226.58 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 20.00 250.00 182.50 125.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 80.00 156.36 149.56 160.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 40.00 192.19 192.19 192.19 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 50.00 150.00 135.97 145.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 40.00 140.00 199.68 148.90 CR400-374 FY 20 Culvert Prioritization 09/17/20 9.00 156.00 212.50 150.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 40.00 200.15 230.94 230.94 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 343.00 168.24 169.85 183.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,896.00 156.59 152.61 140.38 =============== 203-01510 Backhoe Hour =================================================== PWQM240-172 El Paso County, north Colorad 01/23/20 8.00 125.00 211.50 183.00 STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 40.00 135.00 210.00 210.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 60 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01510 Backhoe Hour =================================================== STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 4.00 150.00 254.55 339.60 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 50.00 150.00 123.50 115.00 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 20.00 220.00 94.00 78.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 20.00 125.00 125.85 120.94 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 40.00 150.00 144.83 240.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 182.00 150.55 137.02 167.86 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 10.00 150.00 87.50 81.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 10.00 50.00 75.00 100.00 SFTY2254-091 225 Ramp Improvements 04/09/20 30.00 200.00 192.50 160.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 40.00 219.00 231.52 231.52 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 50.00 125.00 110.81 75.00 NH050A-037 US 50A Pueblo Regional Pond IM025A-048 Northbound I-25 bridge at Exi 05/28/20 10.00 140.00 174.53 130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 150.00 162.73 129.16 139.47 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 4.00 141.00 165.00 120.00 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 20.00 160.00 175.00 125.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 80.00 146.25 134.01 140.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 40.00 204.71 225.37 225.37 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 144.00 164.25 141.75 161.08 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 476.00 158.53 136.47 156.86 =============== 203-01550 Dozing Hour =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 10.00 175.00 150.00 150.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 90.00 150.00 197.99 210.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 20.00 160.00 162.97 140.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC PWQM240-172 El Paso County, north Colorad 01/23/20 8.00 150.00 320.00 350.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 104.00 150.00 175.00 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 232.00 151.94 180.48 179.31 IM0761-226 I76/SH52 Interchange 04/02/20 40.00 160.00 157.17 105.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 61 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01550 Dozing Hour =================================================== IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 10.00 100.00 90.00 100.00 SFTY2254-091 225 Ramp Improvements 04/09/20 30.00 200.00 202.50 180.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 100.00 160.00 193.14 175.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 10.00 160.00 156.42 110.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 40.00 154.00 283.66 283.66 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 50.00 180.00 160.94 150.00 NH050A-037 US 50A Pueblo Regional Pond -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 280.00 164.86 178.86 171.59 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 40.00 175.00 177.06 206.98 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 20.00 200.00 200.00 200.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 80.00 176.45 170.21 160.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 40.00 144.00 277.69 277.69 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 180.00 171.53 177.16 201.04 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 692.00 162.26 178.97 181.84 =============== 203-01565 Hydraulic Excavator Hour =================================================== FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 10.00 180.00 166.33 179.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 180.00 166.33 179.00 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 40.00 180.00 146.00 105.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 40.00 180.00 146.00 105.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 180.00 148.65 119.80 =============== 203-01580 Truck Hour =================================================== STR0341-101 SH 34 North of Grandby Resurf 04/02/20 40.00 125.00 125.75 123.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 40.00 125.00 125.75 123.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 125.00 125.75 123.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 62 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01582 Truck (Dump) Hour =================================================== STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 20.00 155.00 104.00 123.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 10.00 120.00 128.76 157.52 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 20.00 200.00 104.00 85.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 10.00 150.00 90.00 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 60.00 163.33 107.23 110.59 SFTY2254-091 225 Ramp Improvements 04/09/20 20.00 200.00 130.00 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20.00 200.00 130.00 150.00 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 40.00 116.00 157.25 200.00 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 40.00 130.00 110.00 95.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 80.00 123.00 131.00 147.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 160.00 147.75 125.79 133.97 =============== 203-01590 Front End Loader (Rubber) Hour =================================================== NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 25.00 120.00 190.01 210.02 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 25.00 120.00 190.01 210.02 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 10.00 160.00 105.00 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 160.00 105.00 120.00 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 40.00 160.00 197.00 200.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 20.00 150.00 123.67 110.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 20.00 150.00 140.45 112.26 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 40.00 150.00 128.80 95.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 120.00 153.33 148.56 135.38 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 155.00 148.39 149.72 146.42 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 63 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01594 Combination Loader Hour =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 10.00 130.00 100.00 100.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 10.00 120.00 176.11 185.00 PWQM240-172 El Paso County, north Colorad 01/23/20 8.00 150.00 140.00 110.00 STR141A-044 SH 141 AND SH 145, FROM SLICK 01/30/20 10.00 200.00 133.06 80.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 20.00 122.00 99.00 99.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 40.00 150.00 131.67 110.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 20.00 125.00 141.00 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 118.00 141.02 136.00 117.88 IM0761-226 I76/SH52 Interchange 04/02/20 40.00 120.00 109.94 105.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 22.00 130.00 83.33 30.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 40.00 125.00 120.51 78.80 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 10.00 100.00 75.00 100.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 16.00 120.00 134.33 112.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 10.00 105.00 98.33 100.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 40.00 176.00 183.00 183.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 178.00 132.98 114.57 107.44 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 40.00 110.00 177.13 200.00 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 30.00 130.00 128.14 109.96 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 20.00 150.00 175.00 125.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 30.00 210.00 117.50 125.00 STR184B-006 CULVERTS SH 184 08/06/20 25.00 150.00 110.00 110.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 20.00 120.00 168.57 65.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 40.00 164.58 181.43 181.43 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 205.00 147.97 153.58 140.76 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 501.00 141.00 134.50 123.53 =============== 203-01597 Potholing Hour =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 50.00 250.00 204.04 190.00 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 16.00 300.00 281.67 300.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 50.00 250.00 226.33 264.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 20.00 250.00 277.95 250.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 64 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01597 Potholing Hour =================================================== FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 40.00 400.00 310.00 260.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 20.00 250.00 307.52 315.03 PWQM240-172 El Paso County, north Colorad 01/23/20 40.00 250.00 310.00 290.00 STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 10.00 300.00 670.00 670.00 STR141A-044 SH 141 AND SH 145, FROM SLICK 01/30/20 8.00 500.00 389.20 500.00 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 200.00 250.00 169.00 170.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 20.00 250.00 255.60 238.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 60.00 210.00 336.67 300.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 20.00 260.00 293.00 300.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 10.00 200.00 256.83 240.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 60.00 460.00 266.36 275.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 100.00 300.00 212.50 325.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 40.00 235.00 304.69 275.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 120.00 175.00 220.00 120.01 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 80.00 400.00 287.50 300.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 40.00 400.00 385.00 385.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 10.00 200.00 406.08 462.15 STRR300-249 Grand and Jackson Counties AD 03/05/20 40.00 250.00 410.00 380.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 80.00 250.00 393.33 270.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 100.00 260.00 313.75 300.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 80.00 250.00 192.60 279.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 40.00 250.00 344.20 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,354.00 274.45 268.29 264.55 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 40.00 400.00 380.80 676.79 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 100.00 300.00 414.50 450.00 IM0761-226 I76/SH52 Interchange 04/02/20 200.00 250.00 264.84 196.10 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 40.00 310.00 325.00 310.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 40.00 300.00 293.56 314.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 10.00 260.00 231.25 312.50 SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 150.00 300.00 275.00 275.00 SFTY2254-091 225 Ramp Improvements 04/09/20 60.00 300.00 295.00 240.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 275.00 270.00 260.47 203.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 80.00 240.00 256.67 185.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 40.00 300.00 395.00 500.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 60.00 300.00 352.67 286.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 20.00 230.00 254.38 235.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 260.00 230.00 223.33 175.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 8.00 275.00 355.53 275.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 250.00 200.00 214.75 212.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 30.00 230.00 158.33 250.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 80.00 360.00 368.59 368.59 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 65 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01597 Potholing Hour =================================================== ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 250.00 200.00 155.70 1.00 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 80.00 275.00 125.00 50.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 20.00 350.00 261.67 225.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 175.00 250.00 173.60 175.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,268.00 257.72 239.96 213.72 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 42.00 200.00 174.71 137.00 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 8.00 350.00 325.00 325.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 200.00 265.00 232.50 265.00 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 20.00 240.00 305.00 325.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 90.00 300.00 240.00 225.00 STR184B-006 CULVERTS SH 184 08/06/20 40.00 250.00 260.00 260.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 30.00 250.00 135.00 80.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 72.00 184.82 184.82 184.82 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 80.00 250.00 279.99 214.94 MTCE0702-386 Grand Junction 09/03/20 150.00 400.00 198.33 270.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 100.00 200.00 289.86 350.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 100.00 200.00 308.84 237.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 80.00 250.00 297.70 143.90 SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 175.00 250.00 187.50 100.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 72.00 55.00 199.86 160.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 160.00 336.00 306.32 306.32 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,419.00 259.53 253.80 225.62 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,041.00 262.72 250.61 230.72 =============== 203-01620 Sweeping Hour =================================================== STR2871-038 US 287 Passing Lanes Springfi 03/05/20 10.00 100.00 129.25 58.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 100.00 129.25 58.50 MTCER200-265 Pueblo 05/28/20 100.00 150.00 143.75 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 100.00 150.00 143.75 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 110.00 145.45 143.06 50.77 =============== 203-01622 Sweeping (With Pickup Broom) Hour =================================================== NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 40.00 170.00 242.10 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 40.00 170.00 242.10 350.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 66 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01622 Sweeping (With Pickup Broom) Hour =================================================== C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 40.00 260.00 164.05 300.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 50.00 175.00 148.00 145.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 90.00 212.78 153.58 213.89 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 130.00 199.62 171.90 255.77 =============== 203-02300 Rock Scaler Hour =================================================== C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 1,872.00 160.00 198.50 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,872.00 160.00 198.50 120.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,872.00 160.00 198.50 120.00 =============== 203-02315 Mechanized Scaling Hour =================================================== C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 155.00 500.00 287.50 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 155.00 500.00 287.50 200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 155.00 500.00 287.50 200.00 =============== 203-02330 Laborer Hour =================================================== STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 40.00 45.00 36.75 38.50 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 30.00 50.00 56.26 52.51 PWQM240-172 El Paso County, north Colorad 01/23/20 24.00 55.00 42.00 44.00 STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 20.00 45.00 60.00 60.00 STR141A-044 SH 141 AND SH 145, FROM SLICK 01/30/20 20.00 75.00 58.53 35.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 6.00 80.00 129.94 194.88 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 50.00 60.00 85.84 60.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 20.00 50.00 51.00 50.00 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 10.00 40.00 36.00 37.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 40.00 50.00 32.00 32.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 40.00 55.00 45.10 62.71 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 40.00 80.00 48.78 62.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 340.00 56.76 55.44 52.59 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 67 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-02330 Laborer Hour =================================================== NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 24.00 80.00 67.31 90.17 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 60.00 50.00 33.33 20.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 40.00 60.00 57.06 35.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 60.00 50.00 41.88 43.75 SFTY2254-091 225 Ramp Improvements 04/09/20 40.00 65.00 62.00 60.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 80.00 55.00 52.80 55.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1601-082 Hawkins Signal and Curb Ramps 04/30/20 20.00 50.00 56.33 71.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 24.00 30.00 57.67 79.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 40.00 46.00 45.53 45.53 IM025A-048 Northbound I-25 bridge at Exi 05/28/20 75.00 52.00 66.98 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 463.00 53.52 53.47 49.03 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 40.00 50.00 84.00 50.00 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 20.00 52.00 51.67 35.00 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 40.00 60.00 72.50 45.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 30.00 60.00 47.50 45.00 STR184B-006 CULVERTS SH 184 08/06/20 25.00 50.00 55.00 55.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 40.00 52.91 52.91 52.91 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 40.00 45.00 98.66 57.30 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 40.00 60.00 61.16 55.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 40.00 46.68 48.47 48.47 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 315.00 52.93 72.35 50.07 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,118.00 54.34 58.64 50.40 =============== 206-00000 Str Excav Cubic Yard ============================================= NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 10.00 50.00 299.94 599.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 1,585.00 20.00 19.56 15.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 429.00 60.00 33.70 20.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 338.00 40.00 58.00 58.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 968.00 30.00 22.84 16.23 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 2,942.00 30.00 24.92 30.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 636.00 30.00 23.88 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6,908.00 30.09 23.94 25.74 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 68 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00000 Str Excav Cubic Yard ============================================= IM0761-226 I76/SH52 Interchange 04/02/20 335.00 25.00 31.44 14.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 153.00 30.00 66.33 58.00 SFTY2254-091 225 Ramp Improvements 04/09/20 461.00 30.00 57.50 74.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 20,532.00 20.00 12.16 8.13 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 1,040.00 22.00 21.30 30.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1,220.00 36.00 42.41 42.41 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 23,741.00 21.24 13.47 12.53 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 868.00 28.00 24.20 22.42 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 73.00 45.00 15.88 20.00 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 532.00 50.00 60.00 60.00 STR184B-006 CULVERTS SH 184 08/06/20 71.00 50.00 75.00 75.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 295.00 38.77 38.81 27.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 6,920.00 20.00 27.34 5.80 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 17,651.00 16.07 21.80 21.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 26,410.00 18.60 26.42 18.59 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 57,059.00 21.09 18.04 16.94 =============== 206-00050 Str Bkfl (Spec) Cubic Yard ============================================= NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 4.00 80.00 240.00 240.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 80.00 240.00 240.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1,235.00 57.39 53.72 53.72 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,235.00 57.39 53.72 53.72 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,239.00 57.46 54.32 54.32 =============== 206-00060 Str Bkfl (Spec) (Flow-Fill) Cubic Yard ============================================= NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 2.00 417.00 1566.20 2539.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 69 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00060 Str Bkfl (Spec) (Flow-Fill) Cubic Yard ============================================= NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 445.00 180.00 238.64 160.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 447.00 181.06 240.87 170.64 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 447.00 181.06 240.87 170.64 =============== 206-00065 Str Bkfl (Flow-Fill) Cubic Yard ============================================= NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 1,357.00 200.00 220.38 212.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 2.00 500.00 715.00 730.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 46.00 250.00 236.50 236.50 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 35.00 350.00 311.67 270.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,440.00 205.66 223.29 214.91 IM0761-226 I76/SH52 Interchange 04/02/20 170.00 200.00 213.60 131.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 163.00 40.00 124.00 90.00 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 75.00 400.00 200.00 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 408.00 172.84 188.53 118.11 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 57.00 400.00 205.00 200.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 6.00 700.00 320.00 390.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 3.00 410.00 677.43 200.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 25.00 300.00 228.64 150.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 150.00 215.00 222.19 192.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 241.00 282.07 229.41 195.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,089.00 208.07 215.86 193.71 =============== 206-00066 Str Bkfl (FF Ash) Cubic Yard ============================================= NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 727.00 125.00 325.00 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 727.00 125.00 325.00 300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 727.00 125.00 325.00 300.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 70 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00100 Str Bkfl (CL 1) Cubic Yard ============================================= BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 1,220.00 40.00 82.59 64.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 302.00 60.00 73.40 63.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 40.00 123.00 78.52 50.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 10.00 100.00 485.73 310.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 78.00 60.00 83.00 83.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 2,208.00 60.00 61.72 60.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 15,652.00 45.00 27.70 23.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 19,510.00 46.87 32.84 30.81 IM0761-226 I76/SH52 Interchange 04/02/20 70.00 225.00 71.86 68.90 SFTY2254-091 225 Ramp Improvements 04/09/20 301.00 50.00 104.00 135.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 3,100.00 30.00 40.86 45.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 555.00 80.00 82.69 63.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1,802.00 67.00 70.57 70.57 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,828.00 49.58 50.51 59.56 STR184B-006 CULVERTS SH 184 08/06/20 9.00 200.00 230.00 230.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 285.00 69.97 80.75 66.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 18.00 25.21 25.21 25.21 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 10,152.00 45.00 48.01 39.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 10,193.00 42.86 47.07 47.07 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20,657.00 44.34 48.80 43.43 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 45,995.00 46.07 40.27 40.12 =============== 206-00200 Str Bkfl (CL 2) Cubic Yard ============================================= NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 2.00 41.00 493.95 846.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 240.00 25.00 32.88 9.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 192.00 75.00 50.00 40.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 400.00 40.00 38.98 17.90 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 433.00 55.00 29.35 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,267.00 47.59 35.65 22.27 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 71 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00200 Str Bkfl (CL 2) Cubic Yard ============================================= IM0761-226 I76/SH52 Interchange 04/02/20 138.00 25.00 48.65 10.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 16,435.00 35.00 19.70 22.25 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 60.00 30.00 27.35 7.50 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 207.00 66.00 38.37 38.37 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16,840.00 35.28 19.97 22.30 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 54.00 45.00 28.63 37.57 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 781.00 15.67 32.53 32.53 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 835.00 17.57 31.39 32.86 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18,942.00 35.32 21.01 22.76 =============== 206-00360 Mechanical Reinforcement of Soil Cubic Yard ============================================= BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 1,220.00 27.00 20.67 13.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 290.00 50.00 65.05 120.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 8,935.00 26.00 17.59 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10,445.00 26.78 18.39 15.12 IM0761-226 I76/SH52 Interchange 04/02/20 70.00 20.00 43.36 21.20 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 13,003.00 19.00 18.23 18.99 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 555.00 28.00 26.20 7.50 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 342.00 19.00 27.49 27.49 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 13,970.00 19.36 18.73 18.75 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 5,033.00 13.24 14.74 14.74 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5,033.00 13.24 14.74 14.74 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 29,448.00 20.95 18.49 16.78 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 72 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00505 Filter Matl (Spec) Cubic Yard ============================================= NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 21,112.00 16.00 48.19 47.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 21,112.00 16.00 48.19 47.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21,112.00 16.00 48.19 47.00 =============== 206-00510 Filter Matl (CL A) Cubic Yard ============================================= NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 103.00 75.00 84.14 89.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 103.00 75.00 84.14 89.00 IM0761-226 I76/SH52 Interchange 04/02/20 6.00 90.00 158.73 197.72 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 4.00 300.00 217.88 260.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 58.00 259.00 134.83 134.83 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 68.00 246.50 162.57 147.74 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 139.00 57.00 99.21 75.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 10,375.00 69.68 67.02 67.02 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10,514.00 69.51 69.78 67.13 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10,685.00 70.69 71.74 67.85 =============== 206-00520 Filter Matl (CL B) Cubic Yard ============================================= NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 63.00 80.00 132.80 144.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 30.00 55.00 120.47 128.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 93.00 71.94 127.47 138.84 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 93.00 71.94 127.47 138.84 =============== 206-00530 Filter Matl (CL C) Cubic Yard ============================================= SFTY2254-091 225 Ramp Improvements 04/09/20 96.00 150.00 152.50 165.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 96.00 150.00 152.50 165.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 96.00 150.00 152.50 165.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 73 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-01000 Bed Course Matl Cubic Yard ============================================= NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 11.00 50.00 208.12 47.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 11.00 50.00 208.12 47.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 50.00 208.12 47.35 =============== 206-01750 Shoring LUMP SUM =============================================== STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 1.00 15000.00 16033.33 24200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 15000.00 16033.33 24200.00 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 1.00 23000.00 34750.00 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 23000.00 34750.00 2500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 19000.00 23520.00 13350.00 =============== 206-01781 Shoring (A 1) LUMP SUM =============================================== BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 1.00 20000.00 42083.33 25000.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 20000.00 42083.33 25000.00 IM0761-226 I76/SH52 Interchange 04/02/20 1.00 16000.00 16323.53 14499.70 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1.00 26000.00 22978.46 22978.46 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 21000.00 17155.40 18739.08 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 1.00 55000.00 106334.22 135000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 55000.00 106334.22 135000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 29250.00 54003.94 49369.54 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 74 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-01782 Shoring (A 2) LUMP SUM =============================================== BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 1.00 20000.00 46416.67 28000.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 20000.00 46416.67 28000.00 IM0761-226 I76/SH52 Interchange 04/02/20 1.00 16000.00 15689.24 14499.70 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1.00 26000.00 22978.46 22978.46 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 21000.00 16600.40 18739.08 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 1.00 10000.00 54872.48 55000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 10000.00 54872.48 55000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 18000.00 37876.69 30119.54 =============== 206-01783 Shoring (A 3) LUMP SUM =============================================== IM0761-226 I76/SH52 Interchange 04/02/20 1.00 6000.00 10991.43 6200.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1.00 22000.00 19348.96 19348.96 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 14000.00 12036.12 12774.48 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 14000.00 12036.12 12774.48 =============== 206-01786 Shoring (A 6) LUMP SUM =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 41066.39 65410.73 65410.73 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 41066.39 65410.73 65410.73 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 41066.39 65410.73 65410.73 =============== 206-01787 Shoring (A 7) LUMP SUM =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 41066.39 72633.23 72633.23 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 41066.39 72633.23 72633.23 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 41066.39 72633.23 72633.23 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 75 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-01788 Shoring (A 8) LUMP SUM =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 31940.54 13081.12 13081.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 31940.54 13081.12 13081.12 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 31940.54 13081.12 13081.12 =============== 206-01789 Shoring (A 9) LUMP SUM =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 31940.54 13081.12 13081.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 31940.54 13081.12 13081.12 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 31940.54 13081.12 13081.12 =============== 206-01790 Shoring (A 10) LUMP SUM =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 25192.26 34638.78 34638.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 25192.26 34638.78 34638.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 25192.26 34638.78 34638.78 =============== 206-01791 Shoring (A 11) LUMP SUM =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 25000.00 8322.76 8322.76 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 25000.00 8322.76 8322.76 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 25000.00 8322.76 8322.76 =============== 206-01792 Shoring (A 12) LUMP SUM =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 25192.26 34638.78 34638.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 25192.26 34638.78 34638.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 25192.26 34638.78 34638.78 =============== 206-01793 Shoring (A 13) LUMP SUM =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 25000.00 8322.76 8322.76 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 25000.00 8322.76 8322.76 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 25000.00 8322.76 8322.76 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 76 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-01794 Shoring (A 14) LUMP SUM =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 25192.26 34638.78 34638.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 25192.26 34638.78 34638.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 25192.26 34638.78 34638.78 =============== 206-01795 Shoring (A 15) LUMP SUM =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 25000.00 8322.76 8322.76 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 25000.00 8322.76 8322.76 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 25000.00 8322.76 8322.76 =============== 206-01796 Shoring (A 16) LUMP SUM =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 25192.26 34638.78 34638.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 25192.26 34638.78 34638.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 25192.26 34638.78 34638.78 =============== 206-01797 Shoring (A 17) LUMP SUM =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 25000.00 8322.76 8322.76 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 25000.00 8322.76 8322.76 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 25000.00 8322.76 8322.76 =============== 206-01798 Shoring (A 18) LUMP SUM =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 18251.73 29435.99 29435.99 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 18251.73 29435.99 29435.99 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 18251.73 29435.99 29435.99 =============== 206-01799 Shoring (A 19) LUMP SUM =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 18251.73 29435.99 29435.99 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 18251.73 29435.99 29435.99 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 18251.73 29435.99 29435.99 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 77 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-01800 Shoring (A 20) LUMP SUM =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 25839.80 14632.85 14632.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 25839.80 14632.85 14632.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 25839.80 14632.85 14632.85 =============== 206-01801 Shoring (A 21) LUMP SUM =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 35236.12 40463.47 40463.47 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 35236.12 40463.47 40463.47 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 35236.12 40463.47 40463.47 =============== 207-00205 Topsoil Cubic Yard ============================================= FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 1,612.00 17.00 20.00 20.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 905.00 15.00 14.29 8.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC PWQM240-172 El Paso County, north Colorad 01/23/20 3,765.00 20.00 54.50 62.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 135.00 92.00 47.67 33.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 2,243.00 40.00 52.18 59.48 STR0101-027 SH 10 Overlay La Junta West 02/27/20 160.00 25.00 48.06 52.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 61,063.00 25.00 25.32 18.70 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 46.00 150.00 140.00 140.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 3,058.00 5.00 9.07 8.35 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 731.00 13.00 18.41 8.97 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 3,120.00 10.00 43.33 12.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 13,982.00 8.00 27.62 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 90,820.00 21.18 27.07 20.49 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 451.00 30.00 28.67 45.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 1,838.00 10.00 15.00 12.50 SFTY2254-091 225 Ramp Improvements 04/09/20 915.00 25.00 51.50 51.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 835.00 15.00 31.39 15.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 50.00 12.00 91.33 126.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 10.00 50.00 262.33 640.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 78 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 207-00205 Topsoil Cubic Yard ============================================= C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 3,150.00 12.00 7.15 4.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 13,750.00 8.20 8.55 8.55 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 15,060.00 10.00 15.31 10.00 NH050A-037 US 50A Pueblo Regional Pond -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 36,059.00 10.25 14.80 10.98 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 832.00 13.00 14.56 20.78 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 52.00 53.00 54.67 110.00 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 98.00 20.00 77.00 55.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 296.00 25.00 51.50 55.00 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 497.00 30.00 25.00 25.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 1,752.00 22.41 9.64 6.40 STM094A-038 SH94 WB PASSING LANE 09/01/20 2,445.00 24.56 24.56 24.56 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1,842.00 17.00 15.05 8.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 6,644.00 5.00 7.38 5.90 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 2,367.00 5.00 12.71 2.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 16,825.00 12.69 11.20 11.19 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 143,704.00 17.44 21.10 17.01 =============== 207-00210 Stockpile Topsoil Cubic Yard ============================================= FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 560.00 6.00 23.13 22.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 1,612.00 8.00 15.00 15.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 905.00 8.00 10.24 5.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 573.00 6.00 9.35 7.31 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,650.00 7.38 12.26 12.39 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 451.00 7.50 19.33 28.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 835.00 10.00 7.81 2.55 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 3,150.00 7.00 5.08 3.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 19,835.00 5.70 5.97 5.97 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 24,271.00 6.05 6.12 5.88 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 832.00 7.00 10.64 14.40 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 79 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 207-00210 Stockpile Topsoil Cubic Yard ============================================= NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 497.00 30.00 24.00 24.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 1,752.00 10.58 6.31 5.30 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1,816.00 12.00 8.64 2.50 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 2,218.00 4.00 9.21 1.70 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 20,980.00 9.00 9.11 9.11 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 28,095.00 9.21 8.69 8.28 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 56,016.00 7.72 8.02 7.51 =============== 207-00305 Wetland Topsoil Cubic Yard ============================================= BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 55.00 30.00 28.81 20.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 55.00 30.00 28.81 20.00 IM0761-226 I76/SH52 Interchange 04/02/20 820.00 18.00 15.46 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 820.00 18.00 15.46 11.00 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 3.00 40.00 100.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 40.00 100.00 100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 878.00 18.83 16.23 11.87 =============== 207-00310 Stockpile Wetland Topsoil Cubic Yard ============================================= BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 55.00 20.00 23.74 16.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 55.00 20.00 23.74 16.00 IM0761-226 I76/SH52 Interchange 04/02/20 820.00 19.00 14.96 11.99 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 820.00 19.00 14.96 11.99 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 80 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 207-00310 Stockpile Wetland Topsoil Cubic Yard ============================================= NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 3.00 50.00 100.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 50.00 100.00 100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 878.00 19.17 15.48 12.54 =============== 207-00700 Topsoil (Onsite) Cubic Yard ============================================= SHE 0703-461 I-70 and Kipling North Phase 03/26/20 303.00 28.00 33.00 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 303.00 28.00 33.00 21.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 1,220.00 10.00 17.35 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,220.00 10.00 17.35 10.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 646.00 12.50 50.00 85.00 STR184B-006 CULVERTS SH 184 08/06/20 121.00 25.00 46.50 46.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 767.00 14.47 49.70 78.93 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,290.00 13.88 22.34 34.54 =============== 207-00702 Topsoil (Offsite) Cubic Yard ============================================= C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 206.00 50.00 82.50 115.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 206.00 50.00 82.50 115.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 206.00 50.00 82.50 115.00 =============== 207-00703 Topsoil (Wetlnd) Cubic Yard ============================================= FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 201.00 20.00 28.27 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 201.00 20.00 28.27 20.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 201.00 20.00 28.27 20.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 81 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 207-00704 Sub Soil Prep Sq Yard ================================================ SHE 0703-461 I-70 and Kipling North Phase 03/26/20 2,015.00 1.00 5.44 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,015.00 1.00 5.44 7.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 7,930.00 1.00 2.05 0.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7,930.00 1.00 2.05 0.30 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 1,222.00 7.00 9.06 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,222.00 7.00 9.06 6.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,167.00 1.66 2.84 2.13 =============== 208-00002 Erosion Log Type 1 (12 In) Lin Foot =============================================== STA0142-066 SH 14 New Raymer West 01/09/20 100.00 5.00 5.63 6.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 800.00 5.00 9.00 9.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 10,041.00 6.00 6.60 5.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 1,913.00 6.00 6.07 6.50 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STA006A-067 SH 6 Merino to Atwood 01/16/20 300.00 5.00 10.36 11.75 STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 200.00 6.00 5.00 4.75 PWQM240-172 El Paso County, north Colorad 01/23/20 3,697.00 6.00 5.50 6.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 100.00 6.00 13.50 5.00 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 15,510.00 7.00 5.50 5.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 800.00 7.00 5.50 5.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 2,500.00 5.00 4.80 6.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 1,200.00 8.00 6.54 6.75 STR0101-027 SH 10 Overlay La Junta West 02/27/20 2,000.00 5.00 4.61 5.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 2,742.00 5.00 6.96 4.50 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 200.00 5.00 7.50 5.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 1,025.00 5.00 4.79 4.13 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 450.00 6.00 4.83 5.25 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 560.00 6.00 4.50 4.50 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 4,000.00 4.50 4.46 3.65 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 2,150.00 7.00 6.95 5.50 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 57,920.00 5.00 5.39 4.30 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 82 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00002 Erosion Log Type 1 (12 In) Lin Foot =============================================== HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1,760.00 5.00 5.48 5.25 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 510.00 5.50 6.40 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 110,478.00 5.50 5.48 4.74 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 200.00 5.00 6.21 4.93 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 1,000.00 5.00 5.98 6.85 IM0761-226 I76/SH52 Interchange 04/02/20 11,860.00 6.00 4.95 3.91 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 3,380.00 4.50 4.72 4.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 500.00 10.00 10.24 17.50 NHPP1601-077 US 160 MP 29.750 - MP 34.891 04/09/20 200.00 5.00 8.12 5.00 SFTY2254-091 225 Ramp Improvements 04/09/20 3,903.00 5.00 5.00 4.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 15,980.00 5.50 4.94 3.72 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 80.00 6.00 10.23 7.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 86.00 10.00 8.75 11.75 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 1,310.00 6.00 6.00 5.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 1,634.00 5.00 4.57 4.25 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 1,655.00 8.00 7.12 6.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 3,500.00 6.00 4.84 4.75 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 14,600.00 7.00 7.13 7.47 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 27,340.00 4.30 4.32 4.32 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 5,130.00 5.50 5.56 5.25 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 1,000.00 5.00 4.00 2.50 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 80.00 5.00 10.33 7.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 250.00 8.00 7.00 5.01 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 93,688.00 5.47 5.32 4.83 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 600.00 5.00 6.93 7.00 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 1,700.00 5.00 5.81 4.90 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 1,180.00 5.00 4.52 3.68 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 36.00 8.00 5.13 4.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 120.00 8.00 4.88 4.50 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 1,555.00 4.75 5.00 6.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 80.00 6.00 8.00 7.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 5,150.00 3.45 3.45 3.45 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 750.00 7.00 5.03 4.00 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 400.00 10.00 6.65 12.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 17,100.00 5.00 5.20 5.65 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 100.00 6.00 16.13 4.40 CR400-374 FY 20 Culvert Prioritization 09/17/20 1,500.00 6.00 4.65 4.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 83 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00002 Erosion Log Type 1 (12 In) Lin Foot =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 23,085.00 4.05 4.32 4.32 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 53,356.00 4.54 5.08 4.79 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 257,522.00 5.29 5.37 4.78 =============== 208-00007 Erosion Log Type 2 (8 In) Lin Foot =============================================== NH050A-035 US 50A Pueblo Regional Pond 05/28/20 16,600.00 6.20 4.48 3.70 NH050A-037 US 50A Pueblo Regional Pond -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16,600.00 6.20 4.48 3.70 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 3,440.00 4.69 4.95 3.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,440.00 4.69 4.95 3.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20,040.00 5.94 4.56 3.67 =============== 208-00008 Erosion Log Type 2 (12 In) Lin Foot =============================================== NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 350.00 10.00 8.35 10.00 STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 950.00 5.00 8.00 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,300.00 6.35 8.18 8.54 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 116.00 8.00 7.00 7.00 STR184B-006 CULVERTS SH 184 08/06/20 625.00 7.00 7.75 7.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 741.00 7.16 7.63 7.63 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,041.00 6.64 8.03 8.21 =============== 208-00009 Erosion Log Type 2 (18 In) Lin Foot =============================================== STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 280.00 12.00 14.00 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 280.00 12.00 14.00 14.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 280.00 12.00 14.00 14.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 84 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00011 Erosion Bales (Weed Free) Each =================================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 160.00 26.00 33.14 31.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 160.00 26.00 33.14 31.00 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 24.00 25.00 24.50 25.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 245.00 25.00 22.88 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 269.00 25.00 23.02 25.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 429.00 25.37 30.15 27.24 =============== 208-00012 Erosion Log Type 1 (9 In) Lin Foot =============================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 200.00 7.00 8.31 12.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 3,165.00 5.00 4.72 4.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,365.00 5.12 4.85 4.95 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 400.00 6.50 4.17 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 400.00 6.50 4.17 4.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,765.00 5.27 4.80 4.85 =============== 208-00013 Erosion Log Type 1 (20 In) Lin Foot =============================================== STR2871-038 US 287 Passing Lanes Springfi 03/05/20 2,000.00 10.00 6.46 7.28 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,000.00 10.00 6.46 7.28 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1,840.00 7.00 8.82 7.92 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 500.00 7.00 10.70 10.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,340.00 7.00 8.88 8.51 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 85 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00013 Erosion Log Type 1 (20 In) Lin Foot =============================================== STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 3,000.00 10.00 7.00 6.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,000.00 10.00 7.00 6.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,340.00 9.04 7.71 7.46 =============== 208-00020 Silt Fence Lin Foot =============================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 100.00 2.00 8.63 7.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 100.00 3.25 3.00 3.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 4,591.00 1.50 2.71 1.50 PWQM240-172 El Paso County, north Colorad 01/23/20 232.00 4.00 2.00 2.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 13,472.00 2.00 2.10 2.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 1,560.00 3.25 2.47 3.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 1,000.00 2.00 1.94 1.38 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 710.00 4.00 2.15 2.15 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 18,259.00 3.00 2.23 1.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 40,024.00 2.50 2.23 1.71 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 200.00 2.00 2.69 2.08 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 5,500.00 2.25 2.05 1.10 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 390.00 1.00 1.47 1.47 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 2,300.00 2.00 2.29 1.40 NH050A-037 US 50A Pueblo Regional Pond -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8,390.00 2.12 2.12 1.22 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 358.00 3.00 2.80 3.00 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 1,204.00 2.00 3.00 3.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 1,625.00 2.00 3.25 4.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 150.00 5.00 2.85 3.55 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 4,400.00 3.23 2.07 1.50 STM094A-038 SH94 WB PASSING LANE 09/01/20 2,130.00 1.20 1.20 1.20 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 3,320.00 3.00 2.95 5.05 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 86 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00020 Silt Fence Lin Foot =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1,440.00 1.15 1.47 1.47 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 14,627.00 2.45 2.42 2.72 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 63,041.00 2.44 2.25 1.88 =============== 208-00021 Silt Fence (Reinf) Lin Foot =============================================== NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 1,500.00 5.00 3.95 2.89 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,500.00 5.00 3.95 2.89 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 208.00 3.00 8.00 10.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 930.00 3.00 2.94 2.94 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,138.00 3.00 4.50 4.23 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1,400.00 3.00 4.98 3.50 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 300.00 5.00 5.63 7.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,700.00 3.35 5.08 4.26 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,338.00 3.83 4.82 3.78 =============== 208-00023 Erosion Log (Type 3)(12 In) Lin Foot =============================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 1,350.00 6.00 8.08 6.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 1,719.00 6.50 7.06 8.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,069.00 6.28 7.35 7.12 IM025A-048 Northbound I-25 bridge at Exi 05/28/20 60.00 7.00 15.30 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 60.00 7.00 15.30 18.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,129.00 6.29 7.45 7.33 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 87 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00024 Erosion Log (Type 3)(20 In) Lin Foot =============================================== BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 930.00 10.00 9.54 5.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 930.00 10.00 9.54 5.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 930.00 10.00 9.54 5.25 =============== 208-00025 Plastic Sheeting Sq Yard ================================================ FSA2873-194 US 287 Longmont Intersection 02/13/20 1,200.00 10.00 3.25 2.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,200.00 10.00 3.25 2.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,200.00 10.00 3.25 2.50 =============== 208-00033 Sediment Trap Each =================================================== NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 1.00 2000.00 3875.27 5250.53 PWQM240-172 El Paso County, north Colorad 01/23/20 1.00 3000.00 7255.00 8110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 2500.00 5565.13 6680.27 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1.00 10000.00 10898.88 10898.88 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 10000.00 10898.88 10898.88 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 5000.00 6631.88 8086.47 =============== 208-00035 Aggregate Bag Lin Foot =============================================== STA0142-066 SH 14 New Raymer West 01/09/20 800.00 23.00 7.50 6.00 FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 25.00 12.00 18.51 22.00 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 120.00 10.00 12.32 11.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 120.00 10.00 13.00 13.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 3,040.00 5.00 7.48 6.50 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 120.00 6.50 11.14 8.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STA006A-067 SH 6 Merino to Atwood 01/16/20 500.00 23.00 9.85 8.50 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 88 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00035 Aggregate Bag Lin Foot =============================================== STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 200.00 8.00 8.50 11.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 1,500.00 6.00 6.97 6.93 PWQM240-172 El Paso County, north Colorad 01/23/20 1,080.00 12.00 6.50 5.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 100.00 12.00 15.00 12.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 65.00 12.00 30.75 16.50 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 500.00 8.00 8.35 7.20 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 700.00 8.00 9.00 8.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 400.00 10.00 9.89 6.60 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 8.00 8.00 11.84 12.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 100.00 10.00 19.95 11.50 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 200.00 10.00 10.50 11.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 210.00 10.00 16.96 34.25 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 100.00 10.00 9.60 8.00 NHPP0502-082 US 50 MONTROSE RE CHIP SEAL 03/05/20 1,000.00 10.00 7.94 5.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 212.00 10.00 8.45 7.50 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 25,200.00 8.00 6.63 5.80 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 425.00 10.00 6.90 6.75 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 100.00 12.00 9.40 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 36,825.00 8.50 6.90 6.33 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 200.00 9.00 11.99 12.77 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 500.00 10.00 10.80 8.50 IM0761-226 I76/SH52 Interchange 04/02/20 384.00 10.00 9.86 6.36 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 100.00 9.00 18.57 20.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 500.00 15.00 12.81 17.50 SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 1,000.00 12.00 5.00 5.00 C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 200.00 6.00 12.60 14.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 1,220.00 10.00 13.00 12.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 40.00 10.00 15.00 12.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 145.00 10.00 12.67 15.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 1,500.00 8.00 7.33 8.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 200.00 20.00 10.73 10.24 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 100.00 5.00 14.67 24.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 100.00 11.00 10.86 10.86 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 635.00 12.00 7.82 0.10 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 800.00 10.00 8.58 8.00 NH050A-037 US 50A Pueblo Regional Pond ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 220.00 14.00 9.75 7.50 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 120.00 8.00 8.83 7.50 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 60.00 10.00 11.96 11.78 NHPPR100-251 SH 2/ Vasquez 06/25/20 200.00 10.00 20.28 32.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8,224.00 10.48 9.30 9.59 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 600.00 6.00 9.88 10.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 89 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00035 Aggregate Bag Lin Foot =============================================== ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 200.00 8.00 11.87 9.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 335.00 8.00 7.00 7.00 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 1,920.00 6.00 6.95 6.50 FSAC010-124 US 40, US 287, SH 88 08/06/20 175.00 12.00 12.33 14.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 1,530.00 7.00 11.14 6.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 350.00 5.24 5.24 5.24 MTCE0702-386 Grand Junction 09/03/20 100.00 20.00 7.00 11.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 40.00 12.00 11.51 12.00 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 400.00 15.00 12.95 12.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 200.00 10.00 8.01 8.50 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 125.00 14.00 12.53 11.70 SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 1,500.00 12.00 6.25 7.50 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 60.00 2.00 25.46 9.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 200.00 6.40 8.69 8.69 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7,735.00 8.49 9.37 7.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 52,784.00 8.81 7.47 7.03 =============== 208-00041 Rock Check Dam Each =================================================== PWQM240-172 El Paso County, north Colorad 01/23/20 13.00 700.00 2541.00 2482.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 13.00 700.00 2541.00 2482.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 71.00 700.00 992.77 440.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 50.00 540.00 609.05 609.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 121.00 633.88 961.73 509.86 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 2.00 1000.00 1171.06 1225.23 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 4.00 500.00 800.00 500.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 2.00 897.79 1521.76 530.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 724.45 1244.47 688.81 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 142.00 645.04 1037.08 700.49 =============== 208-00045 Conc Washout Str Each =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 1.00 1500.00 4000.00 4000.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 90 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00045 Conc Washout Str Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 6.00 1500.00 2204.98 2384.00 PWQM240-172 El Paso County, north Colorad 01/23/20 14.00 3000.00 898.50 817.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 2.00 2000.00 2824.20 2721.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 1.00 3000.00 2562.97 2500.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 2.00 1970.00 2360.65 2500.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 2.00 2000.00 1280.51 2340.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 2.00 1500.00 1632.32 698.62 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 2.00 2500.00 4619.03 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 32.00 2357.50 2204.63 1680.04 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 1.00 800.00 1358.80 541.43 IM0761-226 I76/SH52 Interchange 04/02/20 3.00 1500.00 5367.23 2915.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 4.00 1500.00 2562.50 1125.00 SFTY2254-091 225 Ramp Improvements 04/09/20 3.00 1500.00 3282.50 1665.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 6.00 2500.00 2732.18 550.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 3.00 2040.00 1290.00 685.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 3.00 2597.00 1612.52 1612.52 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 8.00 1500.00 833.50 500.00 NH050A-037 US 50A Pueblo Regional Pond SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 1.00 2000.00 1320.60 223.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 32.00 1834.72 2182.77 1037.41 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 1.00 1900.00 2256.39 1488.32 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 3.00 2500.00 925.00 750.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 4.00 2000.00 865.00 750.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 4.00 1791.35 1435.73 1000.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1.00 2500.00 2136.97 650.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 2.00 2000.00 2844.48 3230.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 1.00 2200.00 2902.47 4000.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 2.00 800.00 1860.67 200.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 8.00 2666.34 1846.08 1846.08 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 26.00 2161.39 1818.42 1423.73 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 90.00 2114.97 2095.18 1377.50 =============== 208-00046 Pre-fab Conc Washout Str (Type 1) Each =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 1.00 2500.00 2676.38 3200.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 91 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00046 Pre-fab Conc Washout Str (Type 1) Each =================================================== NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 2.00 640.00 1186.67 710.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 3.00 1810.00 1795.49 1180.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 1.00 2000.00 4125.27 5250.53 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 1.00 2500.00 9000.00 5000.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 2.00 2000.00 2898.35 2596.70 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 4.00 1750.00 535.05 400.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 2.00 1600.00 2025.00 2050.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 10.00 1500.00 808.33 600.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 2.00 2000.00 1750.00 500.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 1.00 2000.00 200.00 200.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1.00 1000.00 13146.67 10000.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 2.00 3000.00 2432.50 2885.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 2.00 2500.00 1348.00 1450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 34.00 1791.47 1577.75 1622.76 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 2.00 2000.00 1008.33 1200.00 SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 3.00 2500.00 1800.00 1800.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 2.00 2200.00 2685.30 3300.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1601-082 Hawkins Signal and Curb Ramps 04/30/20 3.00 1500.00 666.67 400.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 2.00 1600.00 3377.33 207.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 4.00 2000.00 611.67 685.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 34.00 500.00 259.75 91.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 2.00 8000.00 4963.60 4963.60 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 2.00 500.00 982.20 350.00 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 9.00 750.00 250.00 250.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 2.00 2200.00 595.00 725.00 NHPPR100-251 SH 2/ Vasquez 06/25/20 4.00 1500.00 1398.55 1256.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 69.00 1199.28 699.79 597.10 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 2.00 1600.00 1381.67 200.00 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 2.00 1613.00 2266.67 600.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 3.00 1625.00 1072.50 1145.00 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 1.00 1000.00 2632.60 1600.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 3.00 2000.00 1271.67 710.00 STR184B-006 CULVERTS SH 184 08/06/20 1.00 600.00 3000.00 3000.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 2.00 500.00 4478.57 2000.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 2.00 2000.00 3154.13 2370.63 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1.00 2500.00 2309.57 5000.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 92 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00046 Pre-fab Conc Washout Str (Type 1) Each =================================================== ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 1.00 1500.00 2173.60 3418.00 SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 3.00 2000.00 1250.00 500.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 8.00 4204.00 4593.26 4593.26 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 29.00 2328.72 2581.41 2316.22 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 132.00 1599.95 1330.22 1238.97 =============== 208-00051 Storm Drain Inlet Protection (Type I) Lin Foot =============================================== BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 9.00 20.00 26.80 15.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC PWQM240-172 El Paso County, north Colorad 01/23/20 18.00 20.00 6.50 5.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 65.00 20.00 31.22 17.44 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 159.00 25.00 9.63 10.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 49.00 15.00 21.68 6.75 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 78.00 15.00 17.80 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 378.00 20.42 16.37 10.74 IM0761-226 I76/SH52 Interchange 04/02/20 197.00 18.00 12.45 6.68 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1,584.00 19.00 12.44 11.77 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 7.00 25.00 48.00 14.00 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 325.00 25.00 27.79 0.10 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 40.00 20.00 17.00 8.50 NH050A-037 US 50A Pueblo Regional Pond SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 160.00 35.00 11.84 10.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,313.00 20.90 14.02 9.54 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 100.00 20.00 15.28 28.05 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 155.00 10.00 11.50 15.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 60.00 12.50 23.79 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 315.00 13.65 15.61 18.38 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,006.00 20.08 14.26 10.62 =============== 208-00052 Storm Drain Inlet Protection (Type II) Lin Foot =============================================== C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 10.00 70.00 25.00 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 70.00 25.00 35.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 93 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00052 Storm Drain Inlet Protection (Type II) Lin Foot =============================================== IM0761-226 I76/SH52 Interchange 04/02/20 10.00 330.00 96.57 117.66 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 10.00 50.00 67.33 39.00 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 325.00 65.00 48.34 0.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 345.00 72.25 50.63 4.64 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 100.00 20.00 88.43 69.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 100.00 20.00 88.43 69.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 455.00 60.71 60.08 19.45 =============== 208-00053 Storm Drain Inlet Protect (Ty I)(84 In) Each =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 15.00 208.00 200.00 200.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 3.00 200.00 425.00 200.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 1.00 200.00 293.17 124.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 8.00 180.00 325.55 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 27.00 198.52 309.28 179.41 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 2.00 55.00 231.19 72.00 NH050A-037 US 50A Pueblo Regional Pond FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 1.00 200.00 171.67 190.00 NHPPR100-251 SH 2/ Vasquez 06/25/20 1.00 200.00 1274.15 2355.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 127.50 322.01 672.33 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 3.00 225.00 177.93 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 225.00 177.93 200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 34.00 192.50 290.55 239.21 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 94 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00054 Storm Drain Inlet Protection (Type II) Each =================================================== NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 69.00 250.00 387.50 300.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 5.00 200.00 267.00 200.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 6.00 300.00 286.67 360.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 6.00 100.00 546.67 210.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 15.00 50.00 369.55 345.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 34.00 250.00 257.00 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 135.00 221.48 323.95 287.37 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 6.00 250.00 276.67 295.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 3.00 250.00 200.67 177.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 9.00 250.00 251.33 255.67 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 8.00 290.00 228.00 216.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 5.00 300.00 344.67 444.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 10.00 300.00 249.90 141.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 23.00 296.52 261.67 232.96 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 167.00 233.35 309.69 278.17 =============== 208-00055 Rigid Inlet Prot Device Each =================================================== STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 220.00 25.00 79.66 80.06 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 220.00 25.00 79.66 80.06 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 3.00 50.00 367.00 177.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 50.00 367.00 177.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 223.00 25.34 85.41 81.36 =============== 208-00056 Storm Drain Inlet Protection (Type III) Each =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 1.00 400.00 65.00 65.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 95 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00056 Storm Drain Inlet Protection (Type III) Each =================================================== NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 3.00 500.00 650.00 300.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 9.00 80.00 354.03 290.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 13.00 201.54 413.50 275.00 IM0761-226 I76/SH52 Interchange 04/02/20 10.00 350.00 307.02 295.74 SFTY2254-091 225 Ramp Improvements 04/09/20 8.00 300.00 307.50 265.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 6.00 350.00 352.83 352.83 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 5.00 250.00 254.33 200.00 NHPPR100-251 SH 2/ Vasquez 06/25/20 7.00 350.00 405.63 43.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 36.00 325.00 314.23 236.03 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 10.00 300.00 225.02 141.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 75.00 200.19 352.83 352.83 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 85.00 211.93 296.03 327.91 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 134.00 241.30 314.32 298.09 =============== 208-00057 Storm Drain Inlet Protect (Ty I)(144 In) Each =================================================== FSA2873-194 US 287 Longmont Intersection 02/13/20 1.00 250.00 384.83 211.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 3.00 300.00 409.34 240.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 287.50 404.44 232.75 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 1.00 300.00 223.33 268.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 300.00 223.33 268.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 290.00 387.97 239.80 =============== 208-00058 Storm Drain Inlet Protect (Ty I)(204 In) Each =================================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 2.00 430.00 467.67 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 430.00 467.67 300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 430.00 467.67 300.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 96 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00070 Vehicle Tracking Pad Each =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 2.00 2500.00 3378.95 2600.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 1.00 3000.00 2500.00 2500.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 2.00 2000.00 4019.81 3476.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 2.00 2000.00 2337.69 3675.37 PWQM240-172 El Paso County, north Colorad 01/23/20 14.00 3000.00 3547.00 5294.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 1.00 3000.00 3750.00 2500.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 3.00 2000.00 2840.00 2500.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 2.00 2600.00 1899.97 1200.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 4.00 1500.00 2213.75 3641.26 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 3.00 2500.00 2425.27 1294.25 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1.00 1000.00 6573.33 12000.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 4.00 2600.00 4703.46 2100.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1.00 3000.00 2415.00 3025.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 40.00 2502.50 3403.31 3759.79 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 1.00 3500.00 2533.11 3954.46 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 4.00 2000.00 2812.50 3125.00 SFTY2254-091 225 Ramp Improvements 04/09/20 2.00 2500.00 4387.50 3775.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 6.00 3000.00 2933.94 2145.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 2.00 2000.00 3438.33 3010.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 4.00 4000.00 3468.06 3468.06 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 5.00 2500.00 2227.25 1000.00 NH050A-037 US 50A Pueblo Regional Pond -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 24.00 2791.67 2761.69 2573.61 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 2.00 2600.00 2827.81 1377.85 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 2.00 3000.00 2700.00 1500.00 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 2.00 3000.00 3530.00 3530.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 4.00 2886.50 2832.02 1500.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 3.00 2770.34 2770.34 2770.34 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1.00 3000.00 3193.05 3500.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 1.00 2500.00 4309.70 3907.70 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 12.00 3394.84 3761.18 3761.18 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 27.00 3085.00 3144.09 2950.69 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 91.00 2751.59 3122.40 3206.89 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 97 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00071 Maint Aggregate (Veh Track Pad) Cubic Yard ============================================= NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 10.00 50.00 143.33 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 50.00 143.33 200.00 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 50.00 100.00 64.16 124.57 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 50.00 75.00 114.68 68.26 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 150.00 100.00 111.69 111.69 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 250.00 95.00 103.21 105.58 STM094A-038 SH94 WB PASSING LANE 09/01/20 100.00 56.69 56.69 56.69 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 500.00 80.00 59.49 75.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 450.00 85.45 127.52 127.52 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,050.00 80.12 66.98 95.76 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,310.00 82.73 72.77 98.43 =============== 208-00075 Pre-fab Vehicle Track Pad Each =================================================== STA0142-066 SH 14 New Raymer West 01/09/20 1.00 4750.00 2218.25 2800.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 1.00 1800.00 3750.00 3750.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 2.00 3000.00 4647.95 5740.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STA006A-067 SH 6 Merino to Atwood 01/16/20 1.00 2500.00 2750.08 2700.00 STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 9.00 3500.00 900.00 900.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 1.00 2000.00 2650.00 2800.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 2.00 1000.00 5199.97 1000.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 2.00 2000.00 3075.00 2500.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 2.00 5000.00 2633.27 1000.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 4.00 5000.00 8612.75 11700.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 2.00 1500.00 5258.00 2750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 27.00 3242.59 4065.00 3441.85 IM0761-226 I76/SH52 Interchange 04/02/20 3.00 4000.00 8189.67 1959.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 98 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00075 Pre-fab Vehicle Track Pad Each =================================================== STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 2.00 2500.00 5133.33 250.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 2.00 1200.00 4833.33 3600.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 2.00 2000.00 7615.63 4200.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 2.00 3000.00 3197.51 3900.00 IM025A-048 Northbound I-25 bridge at Exi 05/28/20 1.00 5475.00 5816.33 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12.00 2906.25 6123.39 2898.08 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 4.00 2121.00 1766.67 1600.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 5.00 3400.00 2207.50 2615.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 4.00 2100.00 6087.86 2830.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 2.00 33060.28 33060.28 33060.28 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 3.00 5000.00 4370.00 4160.00 CR400-374 FY 20 Culvert Prioritization 09/17/20 3.00 3000.00 3000.50 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 21.00 5904.98 4811.24 5352.17 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 60.00 4107.16 4981.42 4001.71 =============== 208-00082 Construction Mat Sq Foot ================================================ NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 175.00 100.00 25.00 25.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 200.00 17.00 28.49 24.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 375.00 55.73 28.10 24.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 375.00 55.73 28.10 24.55 =============== 208-00090 Erosion Control (Curb Ramp) Each =================================================== STRR300-249 Grand and Jackson Counties AD 03/05/20 148.00 300.00 361.00 290.00 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 36.00 300.00 172.57 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 184.00 300.00 314.85 272.39 STMM086-083 ADA PUEBLO METRO 07/09/20 198.00 250.00 675.00 650.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 125.00 300.00 216.67 300.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 203.00 500.00 423.25 295.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 99 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00090 Erosion Control (Curb Ramp) Each =================================================== C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 123.00 400.00 379.09 295.43 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 649.00 366.26 421.35 404.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 833.00 351.62 401.74 375.20 =============== 208-00103 Removal and Disposal of Sediment (Labor) Hour =================================================== STA0142-066 SH 14 New Raymer West 01/09/20 50.00 45.00 52.75 40.00 FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 16.00 65.00 83.03 60.00 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 8.00 75.00 73.33 70.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 20.00 54.00 75.00 75.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 204.50 50.00 82.36 44.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 50.00 55.00 53.41 35.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STA006A-067 SH 6 Merino to Atwood 01/16/20 50.00 45.00 91.00 126.00 STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 40.00 40.00 36.75 38.50 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 40.00 50.00 56.26 52.51 PWQM240-172 El Paso County, north Colorad 01/23/20 16.00 75.00 125.50 219.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 30.00 65.00 62.50 60.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 24.00 70.00 224.49 203.97 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 20.00 50.00 60.60 50.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 40.00 50.00 53.00 46.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 70.00 60.00 88.83 50.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 50.00 52.00 58.50 65.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 16.00 60.00 120.64 60.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 50.00 60.00 40.00 60.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 40.00 50.00 106.23 170.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 80.00 60.00 51.00 50.00 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 30.00 40.00 36.00 37.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 20.00 55.00 54.00 54.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 50.00 50.00 59.25 58.50 NHPP0502-082 US 50 MONTROSE RE CHIP SEAL 03/05/20 20.00 50.00 43.50 35.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 40.00 55.00 57.24 62.71 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 100.00 60.00 51.12 51.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 108.00 60.00 46.75 43.70 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 20.00 65.00 51.00 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,302.50 54.48 67.45 60.96 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 80.00 60.00 60.66 62.37 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 40.00 50.00 30.65 32.50 IM0761-226 I76/SH52 Interchange 04/02/20 60.00 55.00 52.38 53.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 100 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00103 Removal and Disposal of Sediment (Labor) Hour =================================================== STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 16.00 55.00 32.67 20.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 40.00 70.00 48.00 35.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 60.00 40.00 70.00 100.00 NHPP1601-077 US 160 MP 29.750 - MP 34.891 04/09/20 8.00 50.00 54.67 50.00 SFTY2254-091 225 Ramp Improvements 04/09/20 48.00 65.00 53.50 45.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 300.00 60.00 78.91 110.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 30.00 60.00 73.08 58.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 30.00 50.00 66.67 78.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 10.00 60.00 88.33 96.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 24.00 50.00 47.00 35.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 8.00 70.00 56.67 42.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 216.00 50.00 44.39 25.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 100.00 60.00 54.25 19.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 15.00 50.00 41.67 35.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 40.00 60.00 50.99 50.99 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 40.00 70.00 85.96 1.00 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 200.00 50.00 51.35 45.00 NH050A-037 US 50A Pueblo Regional Pond ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 50.00 60.00 42.50 10.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 8.00 100.00 71.67 60.00 NHPPR100-251 SH 2/ Vasquez 06/25/20 10.00 75.00 87.68 113.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,433.00 56.29 59.27 55.82 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 16.00 55.00 160.00 50.00 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 30.00 50.00 48.38 20.00 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 30.00 60.00 56.23 63.45 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 80.00 60.00 90.00 80.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 50.00 75.00 47.50 45.00 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 10.00 100.00 45.00 45.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 50.00 60.00 50.00 65.00 STR184B-006 CULVERTS SH 184 08/06/20 100.00 60.00 55.00 55.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 60.00 70.00 53.71 50.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 80.00 59.45 52.44 52.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 20.00 43.73 43.73 43.73 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 10.00 70.00 112.79 50.00 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 5.00 60.00 77.28 55.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 100.00 50.00 66.80 68.30 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 40.00 50.00 82.55 40.25 CR400-374 FY 20 Culvert Prioritization 09/17/20 24.00 56.00 70.25 35.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 40.00 46.68 53.54 53.54 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 745.00 58.75 64.20 55.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,480.50 56.14 62.36 57.68 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 101 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00105 Removal and Disposal of Sediment (Equip) Hour =================================================== STA0142-066 SH 14 New Raymer West 01/09/20 50.00 85.00 95.75 80.00 FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 16.00 100.00 235.64 250.00 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 8.00 150.00 132.33 92.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 205.00 100.00 164.67 185.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 100.00 110.00 113.50 105.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STA006A-067 SH 6 Merino to Atwood 01/16/20 50.00 85.00 153.51 195.00 STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 40.00 150.00 88.65 82.30 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 40.00 150.00 96.88 78.76 PWQM240-172 El Paso County, north Colorad 01/23/20 16.00 135.00 392.00 454.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 30.00 110.00 130.00 100.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 12.00 120.00 424.42 358.84 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 20.00 120.00 134.40 85.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 8.00 150.00 107.50 85.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 20.00 130.00 143.00 150.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 50.00 105.00 99.00 120.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 16.00 120.00 222.55 100.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 50.00 150.00 72.50 125.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 40.00 100.00 211.27 340.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 80.00 100.00 111.67 100.01 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 30.00 150.00 90.00 100.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 20.00 150.00 137.00 137.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 50.00 150.00 152.75 175.50 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 40.00 120.00 123.20 117.43 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 100.00 150.00 103.33 130.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 20.00 100.00 130.80 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,111.00 118.24 134.41 147.58 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 80.00 150.00 139.91 148.14 IM0761-226 I76/SH52 Interchange 04/02/20 60.00 110.00 111.97 212.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 12.00 100.00 96.00 20.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 40.00 150.00 100.01 78.80 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 30.00 100.00 175.00 100.00 SFTY2254-091 225 Ramp Improvements 04/09/20 48.00 150.00 112.50 105.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 150.00 130.00 161.29 275.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 30.00 120.00 131.02 125.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 30.00 125.00 169.67 169.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 10.00 100.00 99.67 56.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 24.00 125.00 109.38 65.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 24.00 125.00 159.67 125.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 20.00 115.00 111.91 90.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 102 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00105 Removal and Disposal of Sediment (Equip) Hour =================================================== ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 100.00 120.00 101.50 50.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 40.00 130.00 204.98 204.98 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 40.00 120.00 124.17 1.00 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 200.00 50.00 123.81 75.00 NH050A-037 US 50A Pueblo Regional Pond ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 50.00 135.00 42.50 10.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 8.00 150.00 131.67 195.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 996.00 112.55 129.40 123.79 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 30.00 100.00 91.71 20.00 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 30.00 120.00 133.18 106.95 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 80.00 150.00 220.00 215.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 50.00 150.00 112.50 110.00 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 10.00 150.00 120.00 120.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 25.00 150.00 105.00 130.00 STR184B-006 CULVERTS SH 184 08/06/20 40.00 180.00 110.00 110.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 20.00 120.00 140.43 85.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 80.00 127.06 119.54 120.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 40.00 105.92 105.92 105.92 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 10.00 120.00 125.29 120.00 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 5.00 150.00 97.74 65.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 100.00 150.00 112.25 115.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 20.00 110.00 159.10 151.65 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 40.00 183.95 169.35 169.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 580.00 141.14 126.62 127.12 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,687.00 121.08 130.40 134.35 =============== 208-00106 Sweeping (Sediment Removal) Hour =================================================== STA0142-066 SH 14 New Raymer West 01/09/20 20.00 135.00 155.75 121.00 FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 12.00 160.00 206.24 130.00 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 6.00 200.00 215.00 170.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 80.00 150.00 120.00 120.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 750.00 125.00 169.21 153.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 100.00 130.00 159.17 90.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STA006A-067 SH 6 Merino to Atwood 01/16/20 20.00 135.00 265.71 285.00 STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 40.00 125.00 165.00 220.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 40.00 150.00 211.27 262.53 PWQM240-172 El Paso County, north Colorad 01/23/20 24.00 175.00 176.50 93.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 103 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00106 Sweeping (Sediment Removal) Hour =================================================== NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 30.00 150.00 225.00 250.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 24.00 175.00 365.88 181.76 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 20.00 150.00 99.48 75.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 40.00 150.00 176.60 148.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 144.00 140.00 148.50 127.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 270.00 140.00 223.83 138.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 20.00 155.00 191.00 200.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 20.00 125.00 176.74 150.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 10.00 180.00 110.00 200.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 50.00 150.00 213.09 340.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 80.00 140.00 139.00 150.01 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 20.00 125.00 161.50 110.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 10.00 160.00 400.00 400.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 40.00 145.00 172.56 102.93 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 40.00 150.00 281.92 420.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 180.00 150.00 60.93 45.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 40.00 150.00 169.40 225.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,130.00 137.62 178.32 151.47 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 24.00 200.00 158.59 166.41 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 40.00 150.00 139.50 132.00 IM0761-226 I76/SH52 Interchange 04/02/20 60.00 155.00 177.14 159.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 30.00 110.00 123.67 20.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 40.00 180.00 182.94 213.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 30.00 155.00 125.00 100.00 SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 60.00 165.00 20.00 20.00 NHPP1601-077 US 160 MP 29.750 - MP 34.891 04/09/20 8.00 350.00 170.00 150.00 SFTY2254-091 225 Ramp Improvements 04/09/20 60.00 175.00 212.50 125.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 150.00 170.00 173.63 55.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 38.00 160.00 214.00 186.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 30.00 150.00 175.00 145.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 100.00 140.00 151.88 140.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 20.00 120.00 174.33 185.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 360.00 130.00 127.15 50.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 150.00 150.00 101.50 79.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 50.00 150.00 160.50 160.50 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 20.00 165.00 142.28 1.00 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 200.00 50.00 136.69 75.00 NH050A-037 US 50A Pueblo Regional Pond IM025A-048 Northbound I-25 bridge at Exi 05/28/20 60.00 170.00 147.90 120.00 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 50.00 185.00 40.00 5.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 6.00 200.00 195.00 195.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 40.00 150.00 161.82 104.10 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 104 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00106 Sweeping (Sediment Removal) Hour =================================================== NHPPR100-251 SH 2/ Vasquez 06/25/20 100.00 150.00 147.08 128.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,726.00 140.60 141.71 90.79 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 30.00 100.00 110.62 20.00 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 10.00 150.00 174.95 154.10 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 10.00 200.00 300.00 300.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 50.00 150.00 147.50 185.00 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 10.00 150.00 162.60 225.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 24.00 200.00 193.33 275.00 STR184B-006 CULVERTS SH 184 08/06/20 30.00 115.00 110.00 110.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 10.00 95.00 202.57 85.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 80.00 154.85 140.69 120.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 30.00 262.15 262.15 262.15 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 20.00 200.00 149.86 150.00 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 5.00 60.00 136.80 85.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 50.00 100.00 127.51 170.00 SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 300.00 200.00 47.50 75.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 20.00 140.00 175.33 120.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 100.00 136.79 134.82 134.82 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 779.00 167.82 121.91 122.16 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,635.00 143.81 152.79 123.95 =============== 208-00107 Rem Trash Hour =================================================== STA0142-066 SH 14 New Raymer West 01/09/20 20.00 45.00 81.25 45.00 FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 10.00 100.00 185.12 250.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 80.00 70.00 80.00 80.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 20.00 50.00 137.70 60.00 STA006A-067 SH 6 Merino to Atwood 01/16/20 20.00 45.00 99.50 115.00 STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 40.00 200.00 59.45 83.90 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 40.00 100.00 76.88 78.76 PWQM240-172 El Paso County, north Colorad 01/23/20 8.00 200.00 355.00 220.00 STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 20.00 110.00 69.00 69.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 30.00 100.00 180.00 60.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 12.00 100.00 234.94 194.88 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 35.00 120.00 134.20 54.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 40.00 60.00 68.00 61.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 40.00 125.00 69.45 75.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 20.00 150.00 138.88 135.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 40.00 100.00 100.85 85.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 105 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00107 Rem Trash Hour =================================================== C0641-106 SH 64 Meeker West Rural Resur 03/05/20 15.00 200.00 58.70 37.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 40.00 100.00 82.02 71.17 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 40.00 100.00 190.00 170.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 208.00 120.00 112.61 87.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 72.00 110.00 84.33 43.70 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 10.00 112.00 106.40 210.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 860.00 108.14 110.57 86.12 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 12.00 185.00 144.54 234.82 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 40.00 100.00 126.60 161.50 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 28.00 70.00 56.50 10.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 40.00 80.00 72.16 80.40 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 20.00 110.00 41.88 43.75 SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 30.00 150.00 50.00 50.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 80.00 115.00 170.02 110.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 10.00 100.00 296.67 300.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 24.00 40.00 106.88 100.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 4.00 80.00 112.67 60.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 30.00 50.00 63.59 30.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 100.00 90.00 46.25 19.00 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 20.00 120.00 104.18 1.00 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 200.00 75.00 62.44 45.00 NH050A-037 US 50A Pueblo Regional Pond IM025A-048 Northbound I-25 bridge at Exi 05/28/20 60.00 120.00 108.33 110.00 NHPPR100-251 SH 2/ Vasquez 06/25/20 20.00 85.00 60.85 66.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 718.00 92.42 87.91 68.72 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 30.00 10.00 56.28 20.00 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 10.00 100.00 98.51 138.04 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 20.00 89.00 128.67 46.00 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 20.00 150.00 57.50 45.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 20.00 70.00 56.75 45.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 20.00 85.00 50.00 65.00 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 4.00 65.00 237.20 215.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 10.00 95.00 120.29 65.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 60.00 91.75 76.63 100.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 24.00 94.56 94.56 94.56 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 10.00 100.00 151.12 85.00 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 5.00 60.00 173.00 55.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 106 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00107 Rem Trash Hour =================================================== SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 30.00 100.00 50.00 50.00 CR400-374 FY 20 Culvert Prioritization 09/17/20 3.00 117.00 173.00 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 266.00 85.77 86.81 69.59 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,844.00 98.79 96.84 76.96 =============== 208-00146 Pre-fab Conc Washout Str (Type 2) Each =================================================== FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 4.00 2250.00 1908.29 750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 2250.00 1908.29 750.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 2250.00 1908.29 750.00 =============== 208-00200 Erosion Control Management LUMP SUM =============================================== STM094A-038 SH94 WB PASSING LANE 09/01/20 1.00 34588.91 34588.91 34588.91 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 34588.91 34588.91 34588.91 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 34588.91 34588.91 34588.91 =============== 208-00207 Erosion Control Management Day ==================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 32.00 150.00 305.00 305.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 102.00 175.00 384.58 596.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 120.00 250.00 251.64 140.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 60.00 200.00 252.51 105.01 PWQM240-172 El Paso County, north Colorad 01/23/20 90.00 200.00 626.00 922.00 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 75.00 200.00 515.11 380.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 100.00 200.00 144.60 50.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 25.00 500.00 415.00 400.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 36.00 200.00 334.17 165.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 35.00 600.00 630.65 435.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 90.00 215.00 206.01 400.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 80.00 250.00 521.68 600.03 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 29.00 500.00 375.50 351.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 90.00 230.00 175.88 139.16 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 75.00 200.00 598.33 540.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 131.00 210.00 281.04 427.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 107 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00207 Erosion Control Management Day ==================================================== HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 36.00 280.00 262.55 280.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 58.00 250.00 261.00 275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,264.00 237.33 317.60 372.21 IM0761-226 I76/SH52 Interchange 04/02/20 275.00 160.00 188.33 106.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 24.00 150.00 470.67 1000.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 30.00 230.00 218.75 62.50 SFTY2254-091 225 Ramp Improvements 04/09/20 40.00 250.00 209.00 238.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 150.00 250.00 287.70 275.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 110.00 240.00 474.33 634.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 60.00 150.00 186.63 145.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 36.00 250.00 209.70 150.00 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 35.00 250.00 472.77 125.00 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 108.00 350.00 192.69 50.00 NH050A-037 US 50A Pueblo Regional Pond -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 868.00 222.29 242.25 229.74 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 35.00 200.00 489.38 475.00 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 10.00 500.00 475.50 150.00 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 30.00 230.00 199.70 142.40 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 30.00 300.00 81.75 95.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 50.00 300.00 72.50 95.00 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 20.00 1000.00 200.00 200.00 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 15.00 100.00 262.80 270.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 80.00 196.55 135.28 25.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 80.00 250.00 216.73 45.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 50.00 500.00 191.13 288.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 27.00 180.00 356.52 427.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 427.00 304.41 215.80 162.95 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,559.00 243.42 268.71 288.96 =============== 208-00300 Temporary Berms Lin Foot =============================================== PWQM240-172 El Paso County, north Colorad 01/23/20 250.00 8.00 11.50 10.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 100.00 1.00 25.98 20.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 108 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00300 Temporary Berms Lin Foot =============================================== NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 75,000.00 1.00 1.76 3.03 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 75,350.00 1.02 1.80 3.08 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 75,350.00 1.02 1.80 3.08 =============== 208-00301 Temporary Diversion Lin Foot =============================================== HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 123.00 276.00 100.30 180.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 123.00 276.00 100.30 180.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 123.00 276.00 100.30 180.00 =============== 208-00400 Water Control LUMP SUM =============================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1.00 30000.00 95613.33 150000.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1.00 60000.00 116225.25 43000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 45000.00 110603.82 96500.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1.00 72000.00 65446.23 65446.23 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 72000.00 65446.23 65446.23 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 1.00 55000.00 47858.19 39849.11 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 1.00 18000.00 14666.67 20000.00 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 1.00 35000.00 14000.00 15000.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 1.00 50000.00 56000.00 15000.00 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 1.00 60000.00 65000.00 65000.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 117208.88 126980.29 126980.29 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 55868.15 44208.63 46971.57 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 55245.43 72045.10 60030.63 =============== 210-00001 Res Structure Each =================================================== C1601-082 Hawkins Signal and Curb Ramps 04/30/20 1.00 1000.00 1098.33 2300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 1000.00 1098.33 2300.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 109 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00001 Res Structure Each =================================================== STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 1.00 2500.00 1100.00 2200.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 6.00 2000.00 2241.45 2107.23 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 3.00 50.00 710.65 489.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 1465.00 1634.02 1631.04 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 1422.73 1604.26 1691.85 =============== 210-00002 Reset Structure LUMP SUM =============================================== SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1.00 10000.00 7318.80 9064.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 10000.00 7318.80 9064.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 10000.00 7318.80 9064.00 =============== 210-00010 Res Mailbox Str Each =================================================== STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 1.00 500.00 476.67 1000.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 7.00 375.00 427.37 423.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 390.63 429.87 495.56 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 2.00 500.00 696.59 232.94 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 500.00 696.59 232.94 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 412.50 468.53 443.04 =============== 210-00011 Res Mailbox Str (Ty 1) Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 81.00 241.00 169.76 181.00 STA006A-067 SH 6 Merino to Atwood 01/16/20 7.00 300.00 399.02 350.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 10.00 250.00 328.00 306.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 110 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00011 Res Mailbox Str (Ty 1) Each =================================================== STR0101-027 SH 10 Overlay La Junta West 02/27/20 17.00 500.00 426.70 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 115.00 283.66 229.14 234.53 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 1.00 300.00 456.00 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 300.00 456.00 500.00 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 1.00 500.00 555.00 250.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 4.00 200.00 304.53 235.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 260.00 323.80 238.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 121.00 282.82 237.33 236.87 =============== 210-00012 Res Mailbox Str (Ty 2) Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 14.00 333.00 190.89 204.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 3.00 500.00 400.50 381.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 17.00 362.47 217.09 235.24 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 1.00 250.00 379.53 235.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 250.00 379.53 235.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18.00 356.22 235.14 235.22 =============== 210-00013 Res Mailbox Str (Ty 3) Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 9.00 483.00 369.71 397.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 2.00 500.00 788.06 900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11.00 486.09 445.78 488.45 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 1.00 375.00 485.50 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 375.00 485.50 500.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 111 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00013 Res Mailbox Str (Ty 3) Each =================================================== STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 1.00 300.00 479.53 235.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 300.00 479.53 235.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13.00 463.23 452.65 469.85 =============== 210-00015 Res End Section Each =================================================== STR2871-038 US 287 Passing Lanes Springfi 03/05/20 3.00 1000.00 1267.17 530.01 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 1000.00 1267.17 530.01 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 1000.00 1267.17 530.01 =============== 210-00060 Res Marker Each =================================================== SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1.00 225.00 8320.00 11700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 225.00 8320.00 11700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 225.00 8320.00 11700.00 =============== 210-00065 Res Monument (Ty 3A) Each =================================================== C R100-288 R1 CURB RAMPS - PH 2 09/03/20 9.00 1000.00 975.75 1550.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 17.00 1000.00 366.36 306.79 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 26.00 1000.00 603.10 737.13 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26.00 1000.00 603.10 737.13 =============== 210-00090 Res Delineator Each =================================================== STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 356.00 25.00 16.50 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 356.00 25.00 16.50 15.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 112 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00090 Res Delineator Each =================================================== IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 100.00 2.00 45.63 31.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 100.00 2.00 45.63 31.25 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 3.00 100.00 169.17 24.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 100.00 169.17 24.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 459.00 20.48 25.72 18.60 =============== 210-00200 Reset Flagpole Each =================================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 650.00 1176.71 1650.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 650.00 1176.71 1650.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 650.00 1176.71 1650.00 =============== 210-00300 Res Brick Pavers Sq Yard ================================================ STRR300-249 Grand and Jackson Counties AD 03/05/20 15.00 100.00 169.17 150.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 21.00 200.00 123.33 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 36.00 158.33 142.43 126.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 36.00 158.33 142.43 126.67 =============== 210-00425 Res Bridge Railing Lin Foot =============================================== NHPPR100-251 SH 2/ Vasquez 06/25/20 40.00 80.00 106.23 91.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 40.00 80.00 106.23 91.45 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 92.00 130.00 214.86 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 92.00 130.00 214.86 12.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 132.00 114.85 202.85 36.08 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 113 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00427 Res Pipe Handrailing Lin Foot =============================================== HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 29.00 30.00 42.90 43.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 29.00 30.00 42.90 43.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 29.00 30.00 42.90 43.50 =============== 210-00473 Res TV Cameras Each =================================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1.00 1200.00 1223.33 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1200.00 1223.33 1200.00 IM0761-226 I76/SH52 Interchange 04/02/20 1.00 1500.00 646.57 700.66 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 1.00 2500.00 679.33 460.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 2000.00 656.40 580.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 1733.33 787.23 786.89 =============== 210-00475 Res CCTV Pole Each =================================================== IM0761-226 I76/SH52 Interchange 04/02/20 1.00 1500.00 3175.71 3962.28 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 1500.00 3175.71 3962.28 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 8500.00 9095.00 9095.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 8500.00 9095.00 9095.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 5000.00 3915.62 6528.64 =============== 210-00476 Reset MVRD Each =================================================== SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 8.00 16000.00 714.20 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 16000.00 714.20 350.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 16000.00 714.20 350.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 114 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00477 Reset Weather Station Each =================================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 16000.00 17120.00 17120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 16000.00 17120.00 17120.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 16000.00 17120.00 17120.00 =============== 210-00479 Res Radio Com Antenna Each =================================================== FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 3.00 850.00 796.67 950.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 2.00 1000.00 574.10 338.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 910.00 679.53 705.40 FSAC010-124 US 40, US 287, SH 88 08/06/20 1.00 1000.00 778.33 750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1000.00 778.33 750.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 925.00 693.00 712.83 =============== 210-00530 Rebuild Port of Present Str Sq Foot ================================================ NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 16.00 550.00 760.00 420.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 40.00 125.00 229.00 218.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 56.00 246.43 380.71 275.71 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 194.00 97.00 69.60 69.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 194.00 97.00 69.60 69.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 250.00 130.47 183.47 115.77 =============== 210-00750 Res Light Standard Each =================================================== IM0761-226 I76/SH52 Interchange 04/02/20 10.00 1400.00 1550.30 1189.32 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 1400.00 1550.30 1189.32 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 1400.00 1550.30 1189.32 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 115 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00760 Res Luminaire Each =================================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 6.00 400.00 395.00 380.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 2.00 380.00 244.50 247.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 395.00 367.64 346.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 395.00 367.64 346.75 =============== 210-00810 Res Ground Sign Each =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 1.00 400.00 1689.59 255.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 3.00 230.00 325.00 325.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 5.00 295.00 317.04 340.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 12.00 300.00 348.67 500.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 1.00 300.00 462.00 650.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 5.00 300.00 366.67 275.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 138.00 175.00 224.60 193.81 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 4.00 300.00 301.86 290.92 STRR300-249 Grand and Jackson Counties AD 03/05/20 30.00 400.00 540.00 500.00 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 7.00 400.00 224.38 50.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 36.00 400.00 440.00 500.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 10.00 260.00 350.97 388.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 10.00 200.00 388.50 392.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 4.00 400.00 351.00 165.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 266.00 258.33 323.06 303.29 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 5.00 250.00 490.00 450.00 IM0761-226 I76/SH52 Interchange 04/02/20 5.00 300.00 292.29 424.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 7.00 280.00 562.50 1000.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 10.00 300.00 456.25 437.50 SFTY2254-091 225 Ramp Improvements 04/09/20 4.00 400.00 720.00 700.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 7.00 300.00 358.33 375.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 2.00 300.00 628.67 322.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 2.00 250.00 180.88 150.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 2.00 255.00 367.67 120.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 8.00 300.00 266.72 500.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 2.00 300.00 270.21 270.21 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 8.00 320.00 453.00 593.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 62.00 299.68 373.89 510.30 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 116 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00810 Res Ground Sign Each =================================================== C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 5.00 300.00 293.75 500.00 STMM086-083 ADA PUEBLO METRO 07/09/20 72.00 200.00 325.00 250.00 MTCER300-255 MTCE R3 FY20/21 Signal Replac 07/09/20 25.00 300.00 387.50 200.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 10.00 400.00 247.50 220.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 13.00 600.00 236.00 50.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 31.00 200.00 317.00 260.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 30.00 350.00 552.02 264.09 MTCE0702-386 Grand Junction 09/03/20 2.00 1000.00 495.00 385.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 5.00 315.00 412.93 500.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 250.00 271.58 271.58 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 194.00 287.24 377.06 246.77 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 522.00 273.98 349.94 306.87 =============== 210-00815 Res Sign Panel Each =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 4.00 100.00 1083.97 26.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 8.00 150.00 212.03 227.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 1.00 350.00 100.00 100.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 1.00 200.00 256.00 176.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 7.00 120.00 138.34 150.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 5.00 195.00 291.02 370.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 5.00 50.00 204.67 270.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 4.00 200.00 61.16 72.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 29.00 450.00 232.00 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 64.00 282.27 244.53 168.66 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 23.00 400.00 99.06 93.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 6.00 90.00 375.00 160.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 15.00 200.00 211.67 150.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 3.00 165.00 341.67 500.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 8.00 180.00 170.25 173.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 55.00 266.82 149.96 149.94 FSAC010-124 US 40, US 287, SH 88 08/06/20 3.00 500.00 203.33 115.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 117 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00815 Res Sign Panel Each =================================================== C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 1.00 100.00 370.02 264.09 MTCE0702-386 Grand Junction 09/03/20 27.00 100.00 186.67 60.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 5.00 150.00 129.67 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 36.00 140.28 188.59 68.86 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 155.00 243.81 193.64 138.84 =============== 210-00816 Res Sign Panel (Spec) Each =================================================== HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 3.00 1000.00 442.50 225.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 1000.00 442.50 225.00 SFTY2254-091 225 Ramp Improvements 04/09/20 2.00 4000.00 1500.00 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 4000.00 1500.00 1500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 2200.00 865.50 735.00 =============== 210-00825 Res Flashing Beacon Each =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 2.00 2000.00 2500.00 2500.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 1.00 2500.00 4689.17 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 2166.67 4141.88 2666.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 2166.67 4141.88 2666.67 =============== 210-00827 Res Pull Box Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 4.00 700.00 1249.33 1843.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 1.00 550.00 1591.00 1600.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 1.00 800.00 1448.17 1400.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 13.00 1000.00 691.67 660.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 2.00 1000.00 324.58 316.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 2.00 270.00 888.00 896.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 23.00 856.09 792.19 929.39 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 118 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00827 Res Pull Box Each =================================================== IM0761-226 I76/SH52 Interchange 04/02/20 2.00 750.00 546.75 709.14 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 1.00 350.00 1176.67 1050.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 616.67 657.91 822.76 STMM086-083 ADA PUEBLO METRO 07/09/20 12.00 850.00 925.00 850.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 2.00 1200.00 1284.00 1284.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 14.00 900.00 952.62 912.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 853.50 807.67 915.31 =============== 210-00831 Res Traf Sig Head Each =================================================== FSA2873-194 US 287 Longmont Intersection 02/13/20 2.00 700.00 907.50 330.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 700.00 907.50 330.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 3.00 350.00 2826.67 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 350.00 2826.67 5000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 490.00 1730.00 3132.00 =============== 210-00840 Res Traf Sig Pole Each =================================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1.00 4200.00 5366.67 5200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 4200.00 5366.67 5200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 4200.00 5366.67 5200.00 =============== 210-00855 Res Traf Sig Control Cab Each =================================================== NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 1.00 5000.00 3909.33 2365.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 119 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00855 Res Traf Sig Control Cab Each =================================================== FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 1.00 2500.00 6660.00 3650.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 2.00 2000.00 2653.20 266.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 2875.00 3640.00 1636.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 2875.00 3640.00 1636.75 =============== 210-00858 Res Pedestal Pole Each =================================================== HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1.00 800.00 999.00 1008.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 800.00 999.00 1008.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 6.00 700.00 1236.00 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 700.00 1236.00 250.00 STMM086-083 ADA PUEBLO METRO 07/09/20 1.00 1000.00 3300.00 2500.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 1.00 1000.00 2716.67 2000.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 3.00 1500.00 2942.67 4300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 1300.00 2944.26 3480.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 958.33 2138.70 1659.00 =============== 210-00860 Res Ped Push Button Each =================================================== HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 5.00 450.00 277.50 280.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 450.00 277.50 280.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 2.00 150.00 808.33 450.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 3.00 700.00 508.83 655.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 6.00 650.00 330.26 300.28 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 11.00 572.73 442.90 424.24 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 534.38 417.06 379.17 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 120 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00865 Res Ped Sig Head Each =================================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 4.00 200.00 550.45 603.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 200.00 550.45 603.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 200.00 550.45 603.00 =============== 210-00867 Res Fire Preempt Unit Each =================================================== FSA2873-194 US 287 Longmont Intersection 02/13/20 1.00 1000.00 1001.83 635.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 2.00 900.00 1848.33 1800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 933.33 1425.08 1411.67 C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 3.00 1000.00 854.83 800.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 3.00 500.00 927.33 1090.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 750.00 891.08 945.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 5.00 450.00 655.00 800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 450.00 655.00 800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 682.14 992.26 993.21 =============== 210-00870 Res Coordination Unit Each =================================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 2.00 1000.00 880.00 850.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1.00 500.00 666.00 672.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 833.33 826.50 790.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 833.33 826.50 790.67 =============== 210-00882 Res Detector Each =================================================== SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 2.00 1000.00 1048.00 1240.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 1000.00 1048.00 1240.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1000.00 1048.00 1240.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 121 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00890 Res Int Detect Sys (Camera) Each =================================================== FSA2873-194 US 287 Longmont Intersection 02/13/20 1.00 1400.00 1495.50 1050.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1.00 1000.00 1641.21 1625.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1200.00 1578.76 1337.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1200.00 1578.76 1337.50 =============== 210-01000 Res Fence Lin Foot =============================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 24.00 25.00 28.44 34.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 315.00 15.00 12.43 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 339.00 15.71 13.57 13.56 IM0761-226 I76/SH52 Interchange 04/02/20 302.00 30.00 11.00 10.39 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 165.00 75.00 16.51 27.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 100.00 40.00 19.10 22.00 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 1,117.00 6.00 6.78 3.00 NH050A-037 US 50A Pueblo Regional Pond -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,684.00 19.08 9.26 7.85 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 97.00 20.00 7.00 7.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 33.00 25.00 20.80 10.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 2,167.00 7.85 5.65 4.90 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 48.00 25.00 49.50 32.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,345.00 8.94 6.45 5.61 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,368.00 13.38 7.84 7.09 =============== 210-01010 Res Gate Post Each =================================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 2.00 1000.00 473.33 460.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1000.00 473.33 460.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1000.00 473.33 460.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 122 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-01011 Res Gate Each =================================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1.00 500.00 490.00 470.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 500.00 490.00 470.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 3.00 450.00 367.57 440.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 450.00 367.57 440.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 462.50 381.17 447.50 =============== 210-01050 Res C L Fence Lin Foot =============================================== SHE 0703-461 I-70 and Kipling North Phase 03/26/20 400.00 20.00 17.00 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 400.00 20.00 17.00 13.00 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 225.00 20.00 42.79 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 225.00 20.00 42.79 15.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 625.00 20.00 26.29 13.72 =============== 210-01130 Res Gdrail Ty 3 Lin Foot =============================================== IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 871.00 35.00 24.72 24.44 NHPPR100-251 SH 2/ Vasquez 06/25/20 25.00 40.00 118.35 60.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 896.00 35.14 27.33 25.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 896.00 35.14 27.33 25.45 =============== 210-01170 Res Gdrail Ty 7 Lin Foot =============================================== NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 43.00 40.00 34.46 32.16 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 43.00 40.00 34.46 32.16 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 43.00 40.00 34.46 32.16 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 123 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-01190 Reset Tensioned Cable Barrier Lin Foot =============================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 7,040.00 20.00 17.70 17.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7,040.00 20.00 17.70 17.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,040.00 20.00 17.70 17.60 =============== 210-01200 Res End Anchorage Each =================================================== IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 3.00 1800.00 3472.22 3444.44 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 1800.00 3472.22 3444.44 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 1800.00 3472.22 3444.44 =============== 210-01700 Res Sprinkler Head Each =================================================== C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 15.00 60.00 78.34 52.68 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 15.00 60.00 78.34 52.68 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15.00 60.00 78.34 52.68 =============== 210-01710 Res Valve Each =================================================== STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 9.00 500.00 1516.24 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9.00 500.00 1516.24 2500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 500.00 1516.24 2500.00 =============== 210-02003 Relay Pipe (3 In) Lin Foot =============================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 400.00 15.00 38.91 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 400.00 15.00 38.91 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 400.00 15.00 38.91 50.00 =============== 210-02004 Relay Pipe (4 In) Lin Foot =============================================== SFTY2254-091 225 Ramp Improvements 04/09/20 35.00 100.00 39.50 54.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 35.00 100.00 39.50 54.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 35.00 100.00 39.50 54.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 124 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-02042 Relay Pipe (42 In) Lin Foot =============================================== NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 60.00 320.00 417.44 417.44 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 60.00 320.00 417.44 417.44 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 60.00 320.00 417.44 417.44 =============== 210-02510 Relay Sprinkler System LUMP SUM =============================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1.00 10000.00 15166.67 29600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 10000.00 15166.67 29600.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 1.00 8000.00 3783.33 2350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 8000.00 3783.33 2350.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 1.00 10000.00 14816.33 5300.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 1.00 5000.00 16867.23 10536.13 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 7500.00 15748.56 7918.07 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 8250.00 13534.36 11946.53 =============== 210-02804 Grinding: Sidwlk and/or Curb Ramp Repair Lin Foot =============================================== STRR300-249 Grand and Jackson Counties AD 03/05/20 137.00 30.00 59.83 34.00 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 66.00 30.00 34.26 41.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 203.00 30.00 49.83 36.28 STMM086-083 ADA PUEBLO METRO 07/09/20 991.00 10.00 51.00 50.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 231.00 35.00 54.00 37.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,222.00 14.73 51.78 47.54 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,425.00 16.90 51.39 45.94 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 125 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-04010 Adj Manhole Each =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 4.00 750.00 875.00 875.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 49.00 750.00 1287.60 1259.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 8.00 700.00 750.00 600.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 92.00 800.00 2131.88 2778.75 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 1.00 1000.00 941.80 729.00 STRR300-249 Grand and Jackson Counties AD 03/05/20 2.00 750.00 730.67 480.00 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 2.00 750.00 561.25 310.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 18.00 1000.00 1661.67 1300.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 4.00 2000.00 1183.96 2500.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1.00 700.00 1303.20 1166.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 181.00 826.80 1615.53 2002.82 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 10.00 1700.00 2107.65 2480.98 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 3.00 1500.00 964.50 1000.00 IM0761-226 I76/SH52 Interchange 04/02/20 7.00 1000.00 910.30 530.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 2.00 750.00 1552.99 227.00 SFTY2254-091 225 Ramp Improvements 04/09/20 1.00 850.00 1337.50 1685.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 3.00 1000.00 2103.33 755.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 26.00 1301.92 1419.71 1381.68 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 1.00 1000.00 992.80 1615.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 2.00 750.00 600.00 300.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 6.00 750.00 828.33 605.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 2.00 750.00 777.91 549.54 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 15.00 750.00 996.29 1000.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 500.00 535.00 535.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 27.00 750.00 928.27 832.56 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 234.00 870.73 1433.68 1798.78 =============== 210-04015 Modify Manhole Each =================================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1.00 5000.00 2440.00 3200.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1.00 2800.00 3251.50 6700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 3900.00 3030.18 4950.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 3900.00 3030.18 4950.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 126 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-04016 Modify Manhole (Spec) Each =================================================== SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1.00 1500.00 2575.00 4125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1500.00 2575.00 4125.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1500.00 2575.00 4125.00 =============== 210-04020 Modify Inlet Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 18.00 2250.00 4185.00 4005.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 18.00 2250.00 4185.00 4005.00 IM0761-226 I76/SH52 Interchange 04/02/20 1.00 2700.00 2955.06 2100.00 SFTY2254-091 225 Ramp Improvements 04/09/20 1.00 3500.00 4745.00 4890.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 3100.00 3352.83 3495.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 1.00 7500.00 4702.50 5700.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 6.00 6000.00 5081.62 5808.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7.00 6214.29 5018.44 5792.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 27.00 3340.74 4412.42 4430.69 =============== 210-04025 Modify Structure Each =================================================== STRR300-249 Grand and Jackson Counties AD 03/05/20 3.00 7000.00 1259.67 870.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 7000.00 1259.67 870.00 NHPPR100-251 SH 2/ Vasquez 06/25/20 1.00 5000.00 3375.15 3169.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 5000.00 3375.15 3169.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 6500.00 1644.30 1444.83 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 127 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-04050 Adj Valve Box Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 45.00 393.00 676.45 824.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 4.00 450.00 425.00 250.00 STRR300-249 Grand and Jackson Counties AD 03/05/20 3.00 400.00 695.00 1000.00 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 2.00 400.00 461.25 800.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 11.00 750.00 591.67 950.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1.00 800.00 698.61 1400.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 2.00 300.00 714.20 583.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 68.00 457.87 648.92 819.06 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 6.00 1500.00 242.00 275.00 IM0761-226 I76/SH52 Interchange 04/02/20 11.00 600.00 617.30 530.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 9.00 350.00 443.33 350.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 4.00 400.00 441.67 450.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 1.00 300.00 1619.00 493.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 31.00 666.13 553.91 416.87 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 2.00 350.00 565.20 915.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 2.00 450.00 686.33 750.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 7.00 500.00 383.33 400.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 15.00 450.00 422.58 445.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 4.00 450.00 568.68 393.40 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 2.00 350.00 530.43 1000.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 5.00 500.00 511.27 278.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 37.00 455.41 471.15 480.23 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 136.00 504.67 561.87 635.20 =============== 210-04060 Adj Water Meter Each =================================================== SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1.00 300.00 2226.00 1090.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 300.00 2226.00 1090.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 300.00 2226.00 1090.00 =============== 210-04200 Adj Gdrail Lin Foot =============================================== NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 12,941.00 10.00 6.94 5.88 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 128 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-04200 Adj Gdrail Lin Foot =============================================== NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 9,237.50 78472.50 7.30 7.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 22,178.50 32690.18 7.03 6.47 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 22,178.50 32690.18 7.03 6.47 =============== 211-01115 Rock Reinf (No.10) Lin Foot =============================================== C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 2,850.00 100.00 135.00 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,850.00 100.00 135.00 110.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,850.00 100.00 135.00 110.00 =============== 211-02277 Cement Grout (Voids) Cubic Yard ============================================= STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 18.00 2000.00 1500.00 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 18.00 2000.00 1500.00 1500.00 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 10.00 1288.00 1316.67 650.00 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 1.00 1500.00 4550.00 1000.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 85.00 1000.00 750.00 750.00 STR184B-006 CULVERTS SH 184 08/06/20 11.00 1725.00 750.00 750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 107.00 1106.12 865.49 742.99 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 125.00 1234.84 914.94 852.00 =============== 211-03005 Dewatering LUMP SUM =============================================== BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 1.00 15000.00 77422.50 96000.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC PWQM240-172 El Paso County, north Colorad 01/23/20 1.00 250000.00 345000.00 400000.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1.00 15000.00 137125.60 50000.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1.00 10000.00 7538.50 5855.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 72500.00 125923.16 137963.75 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 1.00 25000.00 26949.12 15000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 25000.00 26949.12 15000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 63000.00 92931.81 113371.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 129 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00006 Seeding (Native) Acre =================================================== STA0142-066 SH 14 New Raymer West 01/09/20 0.50 2500.00 3767.25 800.00 FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 0.60 850.00 1313.89 1210.00 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 0.10 10000.00 8398.33 2720.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 0.90 1500.00 825.00 825.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 3.20 950.00 970.96 1159.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 1.90 1200.00 1290.84 1050.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 0.30 3500.00 2005.00 1510.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 0.90 1000.00 1200.78 1101.56 PWQM240-172 El Paso County, north Colorad 01/23/20 11.10 1000.00 2987.50 875.00 STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 0.95 675.00 1600.00 1600.00 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 36.30 1000.00 1182.65 540.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 6.10 1000.00 630.40 452.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 0.20 3000.00 1350.00 1200.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 0.30 2000.00 4897.00 9000.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 0.50 2000.00 3060.89 4700.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 0.50 1000.00 21369.21 40000.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 0.30 550.00 3847.17 6000.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 0.65 4000.00 1654.17 1200.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 0.10 3000.00 1100.00 1200.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 120.00 500.00 405.18 390.55 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 0.20 2000.00 4550.00 8000.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 0.49 5000.00 1250.00 1250.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 10.00 500.00 1523.81 1037.79 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 1.00 800.00 2322.26 1621.19 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 5.80 2000.00 1296.67 1300.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 39.00 1000.00 759.76 840.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 0.15 5000.00 4033.15 6820.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 242.04 790.31 850.00 715.88 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 0.50 2500.00 2367.27 2097.29 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 0.50 2000.00 1690.00 1700.00 IM0761-226 I76/SH52 Interchange 04/02/20 21.30 630.00 591.03 500.11 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 2.70 2000.00 1681.67 2500.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 23.80 370.00 788.87 727.74 SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 0.25 1000.00 500.00 500.00 SFTY2254-091 225 Ramp Improvements 04/09/20 1.70 1200.00 1420.00 840.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 15.40 1000.00 577.35 473.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 0.10 1000.00 15570.17 20240.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 0.03 2000.00 8970.00 21000.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 0.15 2000.00 2608.33 1870.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 130 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00006 Seeding (Native) Acre =================================================== C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 3.90 1000.00 691.25 500.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 0.16 5000.00 6907.33 3472.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 2.20 3000.00 3109.56 844.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 17.00 600.00 624.24 624.24 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 13.40 1000.00 1758.10 0.10 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 28.00 1000.00 744.34 400.00 NH050A-037 US 50A Pueblo Regional Pond ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 1.60 3000.00 3023.75 1562.50 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 0.04 15000.00 4144.67 4550.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 0.42 5000.00 3444.49 1371.43 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 133.15 889.41 859.44 584.50 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 0.34 5000.00 5277.83 4950.00 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 1.50 1000.00 2349.90 1630.90 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 1.10 1500.00 7666.67 8000.00 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 0.19 1600.00 7750.00 3500.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 0.44 1600.00 6900.00 1800.00 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 0.60 2000.00 2200.00 2200.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 0.80 1000.00 1272.50 1545.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 0.10 2000.00 9574.00 17772.00 STR184B-006 CULVERTS SH 184 08/06/20 0.34 5000.00 2200.00 2200.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 0.10 2100.00 6581.14 1400.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 2.30 1443.20 1421.55 1440.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 6.00 1249.06 1249.06 1249.06 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 6.00 1600.00 1216.00 1200.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 21.00 500.00 744.01 675.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 12.00 1600.00 1531.80 1433.80 SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 0.25 2500.00 1000.00 1500.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 0.02 800.00 40666.67 11000.00 CR400-374 FY 20 Culvert Prioritization 09/17/20 0.11 5000.00 5849.25 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 53.19 1151.96 1321.00 1313.49 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 428.38 866.02 921.56 749.25 =============== 212-00007 Seeding (Native) (Hydraulic) Acre =================================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 26.80 2000.00 892.70 731.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 26.80 2000.00 892.70 731.50 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 2.30 1000.00 1777.11 1800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.30 1000.00 1777.11 1800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 29.10 1920.96 954.48 815.95 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 131 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00009 Seeding (Temporary) Acre =================================================== NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 10.00 500.00 374.50 374.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 500.00 374.50 374.50 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 10.00 698.78 461.39 461.39 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 698.78 461.39 461.39 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 599.39 417.95 417.95 =============== 212-00028 Seeding (Wetlands) Acre =================================================== BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 0.20 7500.00 5280.59 4500.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 0.20 7500.00 5280.59 4500.00 IM0761-226 I76/SH52 Interchange 04/02/20 0.50 3000.00 2770.45 3084.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 0.50 3000.00 2770.45 3084.60 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 0.02 10000.00 25000.00 25000.00 STR184B-006 CULVERTS SH 184 08/06/20 0.01 6400.00 25000.00 25000.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 0.24 1000.00 3865.26 4500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 0.27 1866.67 4236.05 6777.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 0.97 3612.37 3631.34 4404.43 =============== 212-00032 Soil Conditioning Acre =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 0.60 2800.00 3826.34 3510.00 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 0.10 15000.00 28648.33 12700.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 132 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00032 Soil Conditioning Acre =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 0.90 3000.00 5250.00 5250.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 3.20 1750.00 2584.50 2812.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 1.90 3500.00 3261.74 3300.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 0.30 3500.00 3175.00 1350.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 0.90 3000.00 2808.25 2616.49 PWQM240-172 El Paso County, north Colorad 01/23/20 7.10 3000.00 3552.50 3105.00 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 36.30 3000.00 2777.94 2640.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 6.10 3000.00 3072.00 2850.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 0.20 5000.00 4500.00 3000.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 0.30 6000.00 6539.75 10000.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 0.50 2500.00 4778.75 8500.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 0.50 3100.00 32354.45 60000.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 0.30 2500.00 6497.86 7000.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 0.65 5000.00 4407.39 4725.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 0.10 5000.00 2746.00 4492.00 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 0.20 4000.00 10150.00 15000.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 0.49 8000.00 4500.00 4500.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 10.00 3000.00 3349.32 3714.75 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 1.00 3000.00 3332.75 3048.97 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 5.80 4000.00 3183.33 3100.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 0.15 4000.00 13461.80 12320.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 77.59 3118.96 3143.79 3481.01 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 0.50 5000.00 6183.96 5395.25 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 0.50 3000.00 6510.00 6500.00 IM0761-226 I76/SH52 Interchange 04/02/20 21.80 2500.00 2071.61 2305.50 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 2.70 5000.00 4378.33 5000.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 23.80 2000.00 3227.72 3655.43 SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 0.25 1000.00 500.00 500.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 42.20 2700.00 3242.54 2849.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 0.10 2700.00 12298.95 16185.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 0.03 5000.00 25490.00 37000.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 0.15 3000.00 7777.33 5700.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 3.90 2800.00 2517.63 2400.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 0.16 6000.00 9969.17 3720.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 2.20 3000.00 6764.29 5905.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 17.00 3100.00 3104.92 3104.92 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 13.40 3200.00 2948.75 10.00 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 1.60 5000.00 3739.25 1562.50 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 0.05 20000.00 16319.67 18000.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 0.42 10000.00 5959.87 5433.33 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 130.76 2767.82 3010.58 2769.88 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 133 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00032 Soil Conditioning Acre =================================================== ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 0.34 5000.00 15440.51 6600.00 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 1.30 3200.00 6329.22 6225.00 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 0.19 2500.00 5875.00 3750.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 0.44 3000.00 4250.00 3000.00 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 0.60 6000.00 4000.00 4000.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 0.80 3500.00 3982.50 2965.00 STR184B-006 CULVERTS SH 184 08/06/20 0.34 6000.00 6000.00 6000.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 0.10 2700.00 22127.86 4400.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 2.30 4083.15 4740.43 4670.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 6.00 3957.91 3957.91 3957.91 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 2.30 3500.00 3607.89 3700.00 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 6.00 4000.00 4947.60 4500.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 21.00 2500.00 2372.57 558.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 12.00 1100.00 633.35 525.05 SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 0.25 2500.00 1000.00 1500.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 0.02 1500.00 41433.33 11000.00 CR400-374 FY 20 Culvert Prioritization 09/17/20 0.11 7000.00 9634.25 9000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 54.09 2748.73 2670.35 2019.28 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 262.44 2867.70 2964.00 2825.42 =============== 212-00050 Sod Sq Foot ================================================ HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 2,125.00 3.00 2.13 2.25 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1,577.00 5.00 3.05 2.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,702.00 3.85 2.73 2.46 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 270.00 5.00 5.50 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 270.00 5.00 5.50 8.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 200.00 5.50 8.67 7.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 300.00 5.00 4.57 1.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 3,000.00 5.00 4.30 0.79 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,500.00 5.03 4.48 1.16 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,472.00 4.44 3.80 2.05 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 134 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00100 Tree Retention and Protection LUMP SUM =============================================== FSAC010-124 US 40, US 287, SH 88 08/06/20 1.00 3000.00 5583.33 7500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 3000.00 5583.33 7500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 3000.00 5583.33 7500.00 =============== 212-00700 Organic Fertilizer Pound ================================================== FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 510.00 3.00 0.72 1.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 510.00 3.00 0.72 1.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 510.00 3.00 0.72 1.50 =============== 212-00701 Compost (Mech App) Cubic Yard ============================================= SHE 0703-461 I-70 and Kipling North Phase 03/26/20 70.00 60.00 99.60 132.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 70.00 60.00 99.60 132.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 69.00 40.00 46.93 78.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 69.00 40.00 46.93 78.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 139.00 50.07 65.91 105.19 =============== 212-00703 Humate Pound ================================================== SHE 0703-461 I-70 and Kipling North Phase 03/26/20 80.00 10.00 3.90 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 80.00 10.00 3.90 5.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 324.00 2.00 1.36 1.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 324.00 2.00 1.36 1.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 404.00 3.58 1.67 2.19 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 135 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00704 Mycorrhizae Pound ================================================== SHE 0703-461 I-70 and Kipling North Phase 03/26/20 20.00 20.00 25.20 27.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 20.00 25.20 27.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 33.00 15.00 9.53 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 33.00 15.00 9.53 10.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 53.00 16.89 13.47 16.42 =============== 212-00705 Elemental Sulfur Pound ================================================== SHE 0703-461 I-70 and Kipling North Phase 03/26/20 24.00 5.00 11.20 17.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 24.00 5.00 11.20 17.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 24.00 5.00 11.20 17.00 =============== 212-00706 Seed (Native) Drill Acre =================================================== SHE 0703-461 I-70 and Kipling North Phase 03/26/20 0.10 1000.00 6218.00 8250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 0.10 1000.00 6218.00 8250.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 1.30 1500.00 825.99 475.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.30 1500.00 825.99 475.00 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 0.25 8000.00 9987.00 9300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 0.25 8000.00 9987.00 9300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.65 2454.55 1724.25 2283.33 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 136 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00708 Seed (Native) Brdcst Acre =================================================== SHE 0703-461 I-70 and Kipling North Phase 03/26/20 0.30 1000.00 3792.00 5500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 0.30 1000.00 3792.00 5500.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 0.40 4000.00 1513.88 750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 0.40 4000.00 1513.88 750.00 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 0.32 5500.00 8013.13 7410.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 0.32 5500.00 8013.13 7410.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.02 3588.24 3353.41 4236.47 =============== 212-00711 Seeding (Wetland) Broadcast Acre =================================================== FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 0.20 7000.00 1798.18 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 0.20 7000.00 1798.18 1500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 0.20 7000.00 1798.18 1500.00 =============== 212-00900 Compost Cubic Yard ============================================= C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 101.00 26.00 33.04 31.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 101.00 26.00 33.04 31.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 101.00 26.00 33.04 31.00 =============== 212-01200 Landscape Restoration LUMP SUM =============================================== C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 1.00 10000.00 4000.00 5000.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1.00 6000.00 6000.00 11800.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 137 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-01200 Landscape Restoration LUMP SUM =============================================== HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1.00 1000.00 7764.25 11200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 5666.67 5932.64 9333.33 C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 1.00 2500.00 6343.33 2030.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 2500.00 6343.33 2030.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 4875.00 6055.85 7507.50 =============== 213-00000 Mulching Acre =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 0.60 2000.00 1096.57 1010.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 0.60 2000.00 1096.57 1010.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 0.60 2000.00 1096.57 1010.00 =============== 213-00002 Mulching (Weed Free Hay) Acre =================================================== STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 0.95 1200.00 2500.00 2500.00 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 36.30 800.00 879.34 660.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 6.10 2000.00 700.30 559.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 0.30 2000.00 3397.90 6000.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 0.50 7700.00 6722.33 12000.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 0.30 750.00 3676.21 6000.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 10.00 1000.00 906.94 1082.25 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 5.30 4000.00 1438.33 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 59.75 1309.71 943.50 972.64 SFTY2254-091 225 Ramp Improvements 04/09/20 1.70 1000.00 1495.00 1190.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 14.70 750.00 938.89 880.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1601-082 Hawkins Signal and Curb Ramps 04/30/20 0.03 4000.00 12663.33 24000.00 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 28.00 650.00 930.13 600.00 NH050A-037 US 50A Pueblo Regional Pond FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 0.04 5000.00 6432.00 7075.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 44.47 702.61 943.65 736.72 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 138 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00002 Mulching (Weed Free Hay) Acre =================================================== NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 1.30 1100.00 1275.39 746.60 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 0.27 2500.00 2350.00 2200.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 0.10 2000.00 8357.33 17772.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 2.30 2144.49 1155.78 1270.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 21.00 1000.00 2401.38 264.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 12.00 1100.00 1301.41 1280.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 36.97 1120.84 1885.26 735.13 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 141.19 1069.04 1211.26 836.14 =============== 213-00003 Mulching (Weed Free) Acre =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 0.20 5000.00 1618.73 2103.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 2.10 900.00 925.34 675.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC PWQM240-172 El Paso County, north Colorad 01/23/20 11.10 700.00 859.00 948.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 0.49 1500.00 2110.00 2110.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 1.00 1000.00 1148.87 967.03 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 39.00 650.00 706.99 635.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 53.89 700.41 736.45 726.05 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 0.50 3500.00 4218.74 3403.37 IM0761-226 I76/SH52 Interchange 04/02/20 18.40 650.00 1189.32 548.55 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 2.70 2000.00 1389.67 2500.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 0.15 1000.00 4347.67 1960.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 3.90 1000.00 1130.50 1100.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 0.10 600.00 11681.43 1446.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 13.00 800.00 792.52 792.52 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 13.40 1200.00 1907.84 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 52.15 953.02 1400.67 646.41 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 0.25 3500.00 4876.55 4560.00 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 0.34 5000.00 6805.21 4950.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 139 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00003 Mulching (Weed Free) Acre =================================================== NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 0.60 3000.00 2300.00 2300.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 0.80 1000.00 1905.00 1810.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 0.10 1000.00 12316.64 2800.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 3.00 510.98 510.98 510.98 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 26.00 286.28 792.52 792.52 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 31.09 458.39 1544.00 902.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 137.13 741.60 1040.33 735.85 =============== 213-00004 Mulching (Weed Free Straw) Acre =================================================== NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 120.00 500.00 624.20 602.61 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 120.00 500.00 624.20 602.61 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 0.16 5000.00 4979.67 4464.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 0.16 5000.00 4979.67 4464.00 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 1.22 3100.00 3566.67 3700.00 STR184B-006 CULVERTS SH 184 08/06/20 0.35 5000.00 2100.00 2100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.57 3523.57 3438.65 3343.31 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 121.73 544.91 660.90 643.03 =============== 213-00007 Mulching (Wood Strand) Acre =================================================== ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 29.00 7500.00 9524.40 11000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 29.00 7500.00 9524.40 11000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 29.00 7500.00 9524.40 11000.00 =============== 213-00008 Mulching (Wood Chip) Cubic Foot ============================================= C R100-288 R1 CURB RAMPS - PH 2 09/03/20 100.00 15.00 12.96 3.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 140 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00008 Mulching (Wood Chip) Cubic Foot ============================================= C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 100.00 20.00 16.50 2.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 200.00 17.50 14.57 2.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 200.00 17.50 14.57 2.65 =============== 213-00011 Mulching (Hydraulic) Acre =================================================== IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 23.80 480.00 1328.95 1157.89 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 23.80 480.00 1328.95 1157.89 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 23.80 480.00 1328.95 1157.89 =============== 213-00012 Spray-on Mulch Blanket Acre =================================================== NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 0.90 4500.00 4268.96 4037.92 PWQM240-172 El Paso County, north Colorad 01/23/20 4.00 3500.00 3450.00 3400.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 0.50 3500.00 5834.49 9400.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 0.65 6000.00 4565.16 4445.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 0.10 2000.00 2610.50 4221.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 1.00 3500.00 4091.49 4141.14 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 0.15 4000.00 9231.90 11030.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7.30 3835.62 4217.86 4252.21 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 0.50 3000.00 7125.00 7000.00 IM0761-226 I76/SH52 Interchange 04/02/20 0.25 4700.00 4964.72 4380.45 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 1.50 3000.00 3825.00 2500.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 1.60 3500.00 2988.57 3000.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 10.00 3700.00 3797.55 3797.55 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 0.42 5200.00 5895.63 6807.14 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 14.27 3641.14 3745.70 3782.73 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 2.30 4500.00 3746.58 3500.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 0.02 300.00 61950.00 11000.00 CR400-374 FY 20 Culvert Prioritization 09/17/20 0.11 8000.00 10137.50 7000.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 141 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00012 Spray-on Mulch Blanket Acre =================================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 10.00 3411.07 3754.12 3754.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.43 3648.17 3986.42 3747.48 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 34.00 3685.46 3952.50 3870.64 =============== 213-00061 Mulch Tackifier Pound ================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 120.00 3.00 3.83 3.60 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 160.00 6.00 1.75 0.90 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 400.00 3.50 3.14 2.85 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC PWQM240-172 El Paso County, north Colorad 01/23/20 2,420.00 3.10 2.78 3.05 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 7,260.00 5.00 6.01 2.88 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 1,300.00 2.50 1.89 1.60 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 56.00 5.00 14.93 10.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 100.00 5.00 17.28 30.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 60.00 3.00 12.54 24.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 24,000.00 4.00 2.05 1.95 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 98.00 100.00 4.50 4.50 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 2,000.00 5.00 2.83 3.04 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1,060.00 6.00 1.67 1.15 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 5,200.00 2.75 2.48 2.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 44,234.00 4.23 3.07 2.39 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 100.00 10.00 8.16 9.45 IM0761-226 I76/SH52 Interchange 04/02/20 3,680.00 2.40 2.49 2.35 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 540.00 3.00 2.83 2.00 SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 40.00 3.00 20.00 20.00 SFTY2254-091 225 Ramp Improvements 04/09/20 340.00 5.00 2.30 0.60 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 7,156.00 3.00 2.11 2.22 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1601-082 Hawkins Signal and Curb Ramps 04/30/20 6.00 15.00 56.33 115.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 30.00 10.00 16.42 7.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 34.00 4.00 19.00 24.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 20.00 5.00 63.70 8.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 8,280.00 2.40 2.44 2.44 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 2,680.00 3.00 2.17 0.10 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 5,600.00 3.00 2.14 1.00 NH050A-037 US 50A Pueblo Regional Pond ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 320.00 5.00 11.75 11.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 4.00 25.00 74.17 72.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 28,830.00 2.84 2.33 2.06 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 142 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00061 Mulch Tackifier Pound ================================================== C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 51.00 12.00 13.00 13.00 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 68.00 5.00 28.11 4.50 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 279.00 4.00 3.75 3.45 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 54.00 3.50 6.63 5.00 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 155.00 4.00 5.00 5.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 160.00 2.50 3.50 4.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 20.00 7.00 15.22 24.00 STR184B-006 CULVERTS SH 184 08/06/20 64.00 20.00 8.00 8.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 460.00 7.87 2.54 2.70 STM094A-038 SH94 WB PASSING LANE 09/01/20 700.00 1.79 1.79 1.79 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 4,200.00 5.00 2.74 3.65 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 2,300.00 2.50 2.36 2.25 SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 50.00 10.00 260.00 500.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 5,280.00 1.68 2.44 2.44 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 13,841.00 3.30 3.35 4.73 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 86,905.00 3.62 2.82 2.66 =============== 213-00067 Rock Mulch (Weed Free) Sq Foot ================================================ STRR300-249 Grand and Jackson Counties AD 03/05/20 363.00 15.00 15.33 25.00 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 37.00 15.00 20.23 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 400.00 15.00 15.92 24.54 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 239.00 25.00 10.83 10.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 200.00 20.00 15.43 10.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 200.00 30.00 20.65 10.06 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 639.00 25.00 16.09 10.02 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,039.00 21.15 16.04 15.61 =============== 213-00070 Landscape Weed Barr Fabric Sq Yard ================================================ C1601-082 Hawkins Signal and Curb Ramps 04/30/20 2.00 20.00 162.33 330.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 20.00 162.33 330.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 143 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00070 Landscape Weed Barr Fabric Sq Yard ================================================ C R100-288 R1 CURB RAMPS - PH 2 09/03/20 200.00 3.00 8.86 7.50 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 200.00 5.00 9.43 7.54 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 4,116.00 2.18 2.15 2.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,516.00 2.34 4.58 2.63 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,518.00 2.35 4.73 2.77 =============== 213-00150 Bonded Fiber Matrix Acre =================================================== PWQM240-172 El Paso County, north Colorad 01/23/20 5.00 3300.00 3450.00 3400.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 1.00 3000.00 4116.49 4141.14 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 5.80 3000.00 2460.00 2700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11.80 3127.12 3084.87 3118.74 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 1.50 3500.00 3937.33 2500.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 27.50 3100.00 2533.85 2409.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 1.50 3200.00 2922.46 3000.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 10.00 3700.00 3754.12 3754.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 40.50 3266.67 2629.68 2766.39 STM094A-038 SH94 WB PASSING LANE 09/01/20 5.00 2740.52 2740.52 2740.52 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 8.00 2800.00 3311.31 4170.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 10.00 3411.07 3754.12 3754.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 23.00 3052.75 3336.30 3678.43 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 75.30 3179.46 2803.90 3100.18 =============== 213-00470 Landscape Border (1/4x5 In) Lin Foot =============================================== C R100-288 R1 CURB RAMPS - PH 2 09/03/20 150.00 7.00 11.28 6.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 150.00 7.00 11.28 6.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 150.00 7.00 11.28 6.50 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 144 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00700 Landscape Boulder Each =================================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 55.00 500.00 185.00 290.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 55.00 500.00 185.00 290.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 55.00 500.00 185.00 290.00 =============== 214-00000 Landscape Maintenance LUMP SUM =============================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 1.00 25000.00 1906.67 1050.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1.00 17000.00 7896.00 8250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 21000.00 5650.00 4650.00 SFTY2254-091 225 Ramp Improvements 04/09/20 1.00 25000.00 5750.00 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 25000.00 5750.00 1500.00 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 1.00 5000.00 32999.50 31000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 5000.00 32999.50 31000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 18000.00 13478.43 10450.00 =============== 214-00005 Landscape Maintenance (24 Month) LUMP SUM =============================================== NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 1.00 7500.00 22218.00 14590.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 7500.00 22218.00 14590.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 25000.00 31557.22 29150.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1.00 28400.00 28769.28 28769.28 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 26700.00 31247.45 28959.64 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 145 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 214-00005 Landscape Maintenance (24 Month) LUMP SUM =============================================== SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1.00 10000.00 13047.83 7500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 10000.00 13047.83 7500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 17725.00 23031.04 20002.32 =============== 214-00222 Decid Tree (2 In Cal) (Furnish) Each =================================================== SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1.00 400.00 1213.40 1375.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 400.00 1213.40 1375.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 7.00 500.00 803.51 990.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7.00 500.00 803.51 990.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 487.50 841.46 1038.13 =============== 214-00504 Evergreen Tree (4 Ft)(B-B) Each =================================================== NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 12.00 700.00 680.57 608.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.00 700.00 680.57 608.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 700.00 680.57 608.20 =============== 214-01013 Live Willow Stakes Each =================================================== NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 475.00 8.00 5.00 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 475.00 8.00 5.00 5.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 475.00 8.00 5.00 5.00 =============== 214-01032 Large Woody Material Each =================================================== FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 1.00 2500.00 1790.63 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 2500.00 1790.63 500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2500.00 1790.63 500.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 146 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 214-01403 Nursery Stock Container (DRC # 60) Each =================================================== C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 25.00 50.00 74.75 69.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 25.00 50.00 74.75 69.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25.00 50.00 74.75 69.00 =============== 216-00021 Soil Reten Blanket (Cl 1) Sq Yard ================================================ STM094A-038 SH94 WB PASSING LANE 09/01/20 13,460.00 3.04 3.04 3.04 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 13,460.00 3.04 3.04 3.04 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13,460.00 3.04 3.04 3.04 =============== 216-00041 Soil Reten Blanket (S/C) Sq Yard ================================================ CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 2,300.00 2.50 2.85 2.60 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,300.00 2.50 2.85 2.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,300.00 2.50 2.85 2.60 =============== 216-00070 Geocell Confinement Sys Sq Yard ================================================ CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 2,990.00 60.00 29.36 16.34 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,990.00 60.00 29.36 16.34 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 359.00 60.00 51.39 45.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 359.00 60.00 51.39 45.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,349.00 60.00 31.45 19.44 =============== 216-00101 Soil Reten Blanket (S-C)(PhotoD Cl 1) Sq Yard ================================================ FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 4,340.00 5.00 3.75 3.75 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 147 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 216-00101 Soil Reten Blanket (S-C)(PhotoD Cl 1) Sq Yard ================================================ NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 21,580.00 3.00 2.10 1.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 25,920.00 3.33 2.16 2.04 C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 968.00 4.00 4.80 4.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 968.00 4.00 4.80 4.25 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 340.00 4.00 6.00 6.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 4,226.00 3.00 3.93 3.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,566.00 3.07 3.95 4.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 31,454.00 3.32 2.59 2.41 =============== 216-00111 Soil Reten Blanket (Excel)(PhotoD Cl 1) Sq Yard ================================================ STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 2,250.00 3.00 5.00 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,250.00 3.00 5.00 5.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,250.00 3.00 5.00 5.00 =============== 216-00201 Soil Reten Blanket (S-C)(BioD Cl 1) Sq Yard ================================================ NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 100.00 11.00 60.50 96.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 14,470.00 2.40 4.38 5.00 STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 1,000.00 4.00 3.40 3.55 PWQM240-172 El Paso County, north Colorad 01/23/20 14,808.00 2.50 2.65 2.80 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 100.00 2.50 5.56 5.82 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 1,000.00 3.50 3.78 3.55 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 968.00 3.00 3.18 3.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 105.00 4.00 4.15 4.15 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 8,000.00 2.50 2.71 2.19 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 2,717.00 4.00 4.78 5.50 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 19,079.00 2.40 2.50 2.50 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1,813.00 3.00 3.40 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 64,160.00 2.59 2.99 3.43 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 148 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 216-00201 Soil Reten Blanket (S-C)(BioD Cl 1) Sq Yard ================================================ IM0761-226 I76/SH52 Interchange 04/02/20 16,633.00 2.00 2.74 2.44 SFTY2254-091 225 Ramp Improvements 04/09/20 1,166.00 4.00 3.25 2.50 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 18,449.00 7.00 3.23 2.98 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 800.00 4.00 2.78 2.60 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 10,600.00 7.00 3.84 3.19 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 15,960.00 2.60 2.66 2.66 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 54,300.00 2.50 2.73 2.40 NH050A-037 US 50A Pueblo Regional Pond -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 117,908.00 3.58 2.89 2.60 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 485.00 3.50 5.49 6.00 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 778.00 2.00 3.54 2.21 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 463.00 5.00 4.25 4.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 1,047.00 5.00 3.75 3.50 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 2,000.00 3.50 3.00 3.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 1,560.00 3.78 3.38 3.60 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 100.00 2.34 3.25 3.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6,433.00 3.72 3.56 3.43 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 188,501.00 3.24 2.93 2.91 =============== 216-00211 Soil Reten Blanket (Exc)(BioD Cl 1) Sq Yard ================================================ ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 50.00 6.00 25.84 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 50.00 6.00 25.84 10.00 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 200.00 10.00 7.58 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 200.00 10.00 7.58 11.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 250.00 9.20 10.73 10.80 =============== 216-00221 Soil Reten Blanket (C)(BioD Cl 1) Sq Yard ================================================ FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 604.00 3.50 3.25 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 604.00 3.50 3.25 3.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 149 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 216-00221 Soil Reten Blanket (C)(BioD Cl 1) Sq Yard ================================================ STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 555.00 4.75 4.00 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 555.00 4.75 4.00 4.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,159.00 4.10 3.43 3.48 =============== 216-00301 Turf Reinf Mat (Cl 1) Sq Yard ================================================ NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 12,649.00 6.50 4.96 4.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12,649.00 6.50 4.96 4.65 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 424.00 8.00 6.50 5.25 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 440.00 7.00 6.80 6.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 864.00 7.49 6.74 5.96 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13,513.00 6.56 5.03 4.73 =============== 216-00302 Turf Reinf Mat (Cl 2) Sq Yard ================================================ NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 19,079.00 8.00 5.77 5.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 19,079.00 8.00 5.77 5.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19,079.00 8.00 5.77 5.30 =============== 216-00303 Turf Reinf Mat (Cl 3) Sq Yard ================================================ NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 113.00 10.00 7.63 8.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 113.00 10.00 7.63 8.50 STM094A-038 SH94 WB PASSING LANE 09/01/20 13,460.00 5.26 5.26 5.26 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 13,460.00 5.26 5.26 5.26 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13,573.00 5.30 5.32 5.29 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 150 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 217-00000 Herbicide Treatment Sq Yard ================================================ FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 3,000.00 3.50 0.57 0.55 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 5,982.00 0.42 0.35 0.30 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 200.00 10.00 5.63 5.25 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 500.00 120.00 3.17 1.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9,682.00 7.75 0.84 0.56 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 199.00 6.00 3.83 6.63 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 199.00 6.00 3.83 6.63 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 10.00 160.00 53.64 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 160.00 53.64 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,891.00 7.87 1.05 0.73 =============== 217-00020 Herbicide Treatment Hour =================================================== PWQM240-172 El Paso County, north Colorad 01/23/20 8.00 200.00 246.00 202.00 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 20.00 150.00 163.42 80.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 8.00 125.00 214.20 165.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 36.00 155.56 184.91 126.00 IM0761-226 I76/SH52 Interchange 04/02/20 20.00 165.00 230.62 265.00 SFTY2254-091 225 Ramp Improvements 04/09/20 8.00 150.00 215.00 300.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 10.00 145.00 179.05 203.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 8.00 85.00 311.63 350.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 20.00 150.00 178.36 100.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 20.00 150.00 161.75 181.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 40.00 200.00 193.04 193.04 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 20.00 125.00 192.04 0.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 146.00 158.42 202.81 177.25 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 151 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 217-00020 Herbicide Treatment Hour =================================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 40.00 171.43 214.00 214.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 40.00 171.43 214.00 214.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 222.00 160.30 200.19 175.56 =============== 218-00000 Noxious Weed Management LUMP SUM =============================================== NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1.00 5400.00 5350.00 5350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 5400.00 5350.00 5350.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 5000.00 5350.00 5350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 5000.00 5350.00 5350.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 5200.00 5350.00 5350.00 =============== 240-00000 Wildlife Biologist Hour =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 4.00 100.00 82.74 77.00 SHER500-210 R5 FY19 CENTER LINE RUMBLE ST 01/09/20 20.00 120.00 1012.50 275.00 STR141A-044 SH 141 AND SH 145, FROM SLICK 01/30/20 20.00 100.00 150.61 80.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 80.00 110.00 87.50 100.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 20.00 130.00 147.75 130.00 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 20.00 150.00 103.50 95.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 20.00 150.00 125.00 125.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 40.00 130.00 126.67 110.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 8.00 100.00 163.00 220.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 232.00 121.55 180.94 123.14 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 15.00 120.00 145.73 121.28 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 20.00 130.00 126.67 130.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 152 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 240-00000 Wildlife Biologist Hour =================================================== STR0341-101 SH 34 North of Grandby Resurf 04/02/20 40.00 150.00 154.56 90.00 SFTY2254-091 225 Ramp Improvements 04/09/20 16.00 25.00 128.00 101.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 80.00 100.00 105.62 82.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1601-082 Hawkins Signal and Curb Ramps 04/30/20 20.00 150.00 126.00 138.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 20.00 110.00 199.00 215.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 20.00 100.00 112.99 112.99 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 40.00 125.00 141.50 66.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 271.00 114.39 124.16 104.04 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 80.00 120.00 98.75 80.00 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 20.00 200.00 170.00 170.00 STR184B-006 CULVERTS SH 184 08/06/20 30.00 150.00 125.00 125.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 40.00 130.00 123.83 78.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 16.00 110.00 110.29 90.00 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 5.00 120.00 166.60 180.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 40.00 140.00 135.49 130.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 231.00 135.32 119.69 104.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 734.00 123.24 134.95 110.33 =============== 240-00010 Rem of Nests Hour =================================================== BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 80.00 95.00 119.65 85.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 50.00 100.00 87.51 105.01 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 80.00 110.00 75.00 80.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 40.00 102.00 87.28 60.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 100.00 100.00 96.92 60.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 40.00 130.00 98.48 120.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 30.00 100.00 128.51 150.00 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 10.00 150.00 91.25 95.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 20.00 125.00 217.99 62.71 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 8.00 100.00 199.34 225.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 458.00 105.85 117.10 87.67 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 8.00 100.00 298.50 285.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 153 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 240-00010 Rem of Nests Hour =================================================== IM0761-226 I76/SH52 Interchange 04/02/20 20.00 100.00 176.57 115.39 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 20.00 140.00 117.67 130.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 80.00 100.00 124.49 82.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP IM025A-048 Northbound I-25 bridge at Exi 05/28/20 20.00 110.00 179.56 105.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 148.00 106.76 138.65 107.35 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 20.00 140.00 97.38 135.00 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 10.00 140.00 130.00 130.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 52.00 105.00 145.14 100.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 16.00 123.16 140.20 1.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 40.00 100.00 123.00 74.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 25.00 75.00 140.88 180.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 40.00 219.72 242.89 242.89 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 203.00 129.53 140.27 130.01 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 809.00 111.96 129.24 101.90 =============== 240-00015 Protect Migratory Birds Hour =================================================== NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 50.00 100.00 53.51 105.01 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 50.00 100.00 53.51 105.01 SFTY2254-091 225 Ramp Improvements 04/09/20 16.00 80.00 128.00 101.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16.00 80.00 128.00 101.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 66.00 95.15 71.56 104.04 =============== 240-00017 Protect Migratory Birds LUMP SUM =============================================== SFTY2254-091 225 Ramp Improvements 04/09/20 1.00 5000.00 5690.00 8900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 5000.00 5690.00 8900.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5000.00 5690.00 8900.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 154 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 240-00020 Netting Sq Yard ================================================ BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 2,200.00 15.00 9.24 6.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 500.00 10.00 14.45 18.90 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 584.00 11.00 12.21 14.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 800.00 10.00 11.46 9.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 560.00 15.00 11.15 10.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 257.00 6.50 12.38 11.40 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1,000.00 10.00 9.88 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,901.00 12.29 10.14 9.92 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 200.00 6.00 30.17 31.57 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP IM025A-048 Northbound I-25 bridge at Exi 05/28/20 400.00 10.00 19.53 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 600.00 8.67 25.61 15.86 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 22.00 10.00 38.63 50.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 12,770.00 45.00 9.17 7.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 96.00 19.27 25.06 1.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 50.00 31.64 31.64 31.64 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 500.00 10.00 9.98 11.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 13,438.00 43.41 9.35 7.29 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19,939.00 33.15 9.90 8.33 =============== 240-00100 Prairie Dog Mgmt LUMP SUM =============================================== SFTY2254-091 225 Ramp Improvements 04/09/20 1.00 1000.00 6750.00 8900.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 20000.00 32069.11 24838.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 10500.00 27005.29 16869.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 10500.00 27005.29 16869.00 =============== 240-00200 Bat House Each =================================================== BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 2.00 500.00 742.89 350.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 155 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 240-00200 Bat House Each =================================================== FBR0343-043 US 34 D-28-P STRUCTURE REPLAC -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 500.00 742.89 350.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 500.00 742.89 350.00 =============== 250-00010 Envir Health/Safety Mngmt LUMP SUM =============================================== NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 1.00 6000.00 3270.75 2845.00 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 1.00 12000.00 9140.44 15000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 9000.00 6205.60 8922.50 IM0761-226 I76/SH52 Interchange 04/02/20 1.00 10000.00 3082.35 2984.96 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 1.00 8000.00 9671.67 20000.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 1.00 5000.00 8233.33 3850.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1.00 3000.00 3204.65 3204.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 6500.00 5606.87 7509.90 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 1.00 10000.00 12300.00 17500.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 2795.00 3088.66 3088.66 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 6397.50 9997.17 10294.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 7099.38 6466.52 8559.16 =============== 250-00050 Monitoring Technician Hour =================================================== CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 40.00 140.00 137.83 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 40.00 140.00 137.83 40.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 40.00 200.00 127.33 150.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 80.00 170.00 173.33 161.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 120.00 180.00 158.00 157.33 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 156 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 250-00050 Monitoring Technician Hour =================================================== CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 40.00 150.00 106.67 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 40.00 150.00 106.67 110.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 200.00 166.00 143.33 124.40 =============== 250-00100 Environmental Health and Safety LUMP SUM =============================================== FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 1.00 10000.00 8526.67 5790.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 1.00 1000.00 7060.50 5485.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 5500.00 7688.86 5637.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 5500.00 7688.86 5637.50 =============== 250-00110 Health and Safety Officer Hour =================================================== NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 10.00 120.00 155.53 125.00 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 40.00 120.00 158.01 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 50.00 120.00 157.51 57.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 40.00 200.00 135.00 150.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 20.00 150.00 210.33 264.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 60.00 183.33 160.11 188.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 40.00 150.00 81.67 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 40.00 150.00 81.67 35.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 150.00 153.33 140.24 103.53 =============== 250-00120 Material Sampling and Delivery Each =================================================== FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 10.00 350.00 407.00 306.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 350.00 407.00 306.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 350.00 407.00 306.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 157 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 250-00200 Material Handling (Stockpile) Cubic Yard ============================================= STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 200.00 25.00 17.08 3.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 20.00 200.00 223.00 314.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 220.00 40.91 35.80 31.27 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 220.00 40.91 35.80 31.27 =============== 250-00204 Materials Management Plan LUMP SUM =============================================== NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1.00 3000.00 1284.00 1284.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 3000.00 1284.00 1284.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 2500.00 3088.66 3088.66 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 2500.00 3088.66 3088.66 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 2750.00 2186.33 2186.33 =============== 250-00210 Solid Waste Disposal Cubic Yard ============================================= FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 20.00 250.00 237.00 336.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20.00 250.00 237.00 336.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 250.00 237.00 336.00 =============== 250-00220 Hazardous Waste Disposal Cubic Yard ============================================= NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 1.00 600.00 585.00 520.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 600.00 585.00 520.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 200.00 20.00 61.50 3.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 158 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 250-00220 Hazardous Waste Disposal Cubic Yard ============================================= FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 5.00 1000.00 676.33 709.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 205.00 43.90 76.50 20.22 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 206.00 46.60 79.78 22.65 =============== 304-01005 ABC (CL 1) Cubic Yard ============================================= NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 100.00 40.00 86.42 81.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 100.00 40.00 86.42 81.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 818.00 65.00 56.33 63.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 818.00 65.00 56.33 63.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 918.00 62.28 59.61 64.96 =============== 304-02000 ABC (CL 2) Ton ==================================================== NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 157.00 35.00 47.00 47.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 157.00 35.00 47.00 47.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 20,077.00 24.00 26.95 22.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20,077.00 24.00 26.95 22.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20,234.00 24.09 26.97 22.99 =============== 304-02005 ABC (CL 2) Cubic Yard ============================================= STM094A-038 SH94 WB PASSING LANE 09/01/20 80.00 85.61 85.61 85.61 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 80.00 85.61 85.61 85.61 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 80.00 85.61 85.61 85.61 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 159 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-05000 ABC (CL 5) Ton ==================================================== NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 1,557.00 40.00 46.00 70.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,557.00 40.00 46.00 70.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,557.00 40.00 46.00 70.00 =============== 304-06000 ABC (CL 6) Ton ==================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 719.00 55.00 56.00 56.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 4,459.00 35.00 44.79 44.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 1,727.00 42.00 50.04 42.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 1,085.00 50.00 51.50 53.00 PWQM240-172 El Paso County, north Colorad 01/23/20 1,547.00 45.00 48.00 63.00 STR141A-044 SH 141 AND SH 145, FROM SLICK 01/30/20 5,318.00 25.00 29.55 24.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 120.00 80.00 80.50 79.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 69,190.00 22.00 27.58 28.73 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 5,145.00 50.00 38.50 32.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 148.00 60.00 58.00 58.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 70,563.00 24.00 23.00 17.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 687.00 70.00 64.40 47.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 160,708.00 25.29 25.59 24.85 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 1,228.92 38.00 38.25 41.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 6,269.00 25.00 34.59 34.17 SFTY2254-091 225 Ramp Improvements 04/09/20 1,947.00 50.00 67.50 59.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 596.41 35.00 55.99 45.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1601-082 Hawkins Signal and Curb Ramps 04/30/20 533.00 40.00 59.33 56.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 3,633.00 45.00 49.33 58.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 12,110.00 30.00 29.15 20.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 14.00 26.00 193.33 345.00 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 358.00 30.00 41.53 29.00 NH050A-037 US 50A Pueblo Regional Pond -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 26,689.33 33.00 34.14 33.88 FSAC010-124 US 40, US 287, SH 88 08/06/20 41.00 45.00 86.67 105.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 160 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-06000 ABC (CL 6) Ton ==================================================== STM094A-038 SH94 WB PASSING LANE 09/01/20 5,740.00 26.42 26.42 26.42 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 1,363.00 50.00 53.83 37.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 1,210.00 35.00 49.63 37.16 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 3,735.00 35.00 41.29 30.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 4,396.00 31.00 33.02 28.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 16,485.00 32.21 38.94 29.66 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 203,882.33 26.86 27.66 26.42 =============== 304-06007 ABC (CL 6) Cubic Yard ============================================= FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 389.00 50.00 74.68 70.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 493.00 75.00 109.00 134.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 309.00 70.00 101.67 92.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 619.00 60.00 85.00 75.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 774.00 55.00 58.20 64.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 1,266.00 45.00 55.45 40.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 11,490.00 50.00 63.53 55.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 230.00 45.00 58.97 55.34 STRR300-249 Grand and Jackson Counties AD 03/05/20 315.00 78.67 131.00 75.00 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 83.00 100.00 91.78 86.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 11,054.00 25.00 66.42 58.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1,867.00 45.00 99.15 65.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 28,889.00 41.30 69.25 59.07 IM0761-226 I76/SH52 Interchange 04/02/20 11,240.00 55.00 50.82 49.70 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 540.00 67.00 68.17 76.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 124.00 80.00 123.33 155.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 503.00 50.00 111.26 102.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 2,426.00 47.00 54.24 54.24 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 14,833.00 54.17 54.67 54.05 STMM086-083 ADA PUEBLO METRO 07/09/20 51.00 80.00 97.50 70.00 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 21.00 60.00 152.50 185.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 311.00 77.00 110.00 95.00 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 1,060.00 55.00 57.39 39.95 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 192.00 60.00 131.57 90.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 161 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-06007 ABC (CL 6) Cubic Yard ============================================= CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 340.00 80.00 35.00 50.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 862.00 66.61 77.68 71.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 154.00 36.00 70.21 75.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 6,486.00 50.00 52.93 45.30 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1,751.00 54.50 59.90 59.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 11,228.00 54.24 59.18 52.11 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 54,950.00 47.42 60.81 56.29 =============== 304-06008 ABC (CL 6) (Spec) Cubic Yard ============================================= IM0761-226 I76/SH52 Interchange 04/02/20 270.00 65.00 95.54 71.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 270.00 65.00 95.54 71.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 270.00 65.00 95.54 71.00 =============== 304-07000 ABC (CL 7) Ton ==================================================== STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 12,248.40 30.00 32.00 24.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12,248.40 30.00 32.00 24.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12,248.40 30.00 32.00 24.00 =============== 304-07009 ABC (CL 7) (Spec) Ton ==================================================== STA0142-066 SH 14 New Raymer West 01/09/20 8,284.00 22.50 21.25 22.00 STA006A-067 SH 6 Merino to Atwood 01/16/20 2,879.00 22.50 28.38 23.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11,163.00 22.50 22.31 22.39 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,163.00 22.50 22.31 22.39 =============== 304-07010 ABC (CL 7) (Spec) Cubic Yard ============================================= FSA2873-194 US 287 Longmont Intersection 02/13/20 61.00 45.00 117.67 92.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 61.00 45.00 117.67 92.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 61.00 45.00 117.67 92.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 162 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-08000 ABC (Shoulder Material) Ton ==================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 1,423.00 30.00 41.67 31.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,423.00 30.00 41.67 31.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 385.00 54.22 54.22 54.22 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 385.00 54.22 54.22 54.22 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,808.00 35.16 42.71 35.94 =============== 304-08002 ABC (Shoulder Material) Cubic Yard ============================================= STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 3,952.00 50.00 72.45 80.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 5,958.00 45.00 31.88 24.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 613.00 45.00 99.28 95.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10,523.00 46.88 51.04 49.17 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 1,504.00 50.00 75.87 90.30 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 98.00 300.00 382.66 382.66 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,602.00 65.29 80.79 108.18 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 85.00 236.34 435.25 435.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 85.00 236.34 435.25 435.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12,210.00 50.61 56.72 59.60 =============== 304-09000 ABC (Spec) Cubic Yard ============================================= C1601-082 Hawkins Signal and Curb Ramps 04/30/20 1.00 70.00 690.00 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 70.00 690.00 1100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 70.00 690.00 1100.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 163 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-09014 ABC (Spec) Ton ==================================================== STR141A-044 SH 141 AND SH 145, FROM SLICK 01/30/20 13,038.00 27.00 31.78 26.75 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 17,797.00 25.00 25.74 21.67 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 2,079.00 84200.00 45.00 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 32,914.00 5342.67 29.33 25.16 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 4,043.00 40.00 38.57 40.22 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 201.00 45.00 65.00 54.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4,244.00 40.24 39.82 40.87 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 3,171.00 34.00 32.20 23.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,171.00 34.00 32.20 23.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40,329.00 4367.26 30.60 26.65 =============== 304-09100 ABC (RAP) Ton ==================================================== NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1,777.00 10.00 22.08 22.08 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,777.00 10.00 22.08 22.08 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 63.00 7.46 51.69 51.69 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 63.00 7.46 51.69 51.69 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,840.00 9.91 23.09 23.09 =============== 306-01000 Reconditioning Sq Yard ================================================ BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 966.00 10.00 15.50 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 966.00 10.00 15.50 7.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 966.00 10.00 15.50 7.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 164 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 310-00608 Full Depth Reclam. of HMA Pvmt (0-8 in.) Sq Yard ================================================ IM0761-226 I76/SH52 Interchange 04/02/20 10,341.00 4.50 3.43 3.50 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 7,967.00 3.00 5.55 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 18,308.00 3.85 3.95 3.72 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18,308.00 3.85 3.95 3.72 =============== 310-00610 Full Depth Reclam. of HMA Pvmt (8-12 in) Sq Yard ================================================ STR141A-044 SH 141 AND SH 145, FROM SLICK 01/30/20 53,310.00 2.50 3.52 2.10 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 40,950.00 3.00 4.45 4.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 94,260.00 2.72 3.81 3.27 IM0761-226 I76/SH52 Interchange 04/02/20 5,170.00 6.00 4.44 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,170.00 6.00 4.44 5.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 99,430.00 2.89 3.87 3.36 =============== 310-00614 Full Depth Reclam of HMA Pvmt (12-16 in) Sq Yard ================================================ IM0761-226 I76/SH52 Interchange 04/02/20 3,103.00 7.00 6.41 8.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,103.00 7.00 6.41 8.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,103.00 7.00 6.41 8.50 =============== 403-00720 HMA (Patching) (Asph) Ton ==================================================== STA0142-066 SH 14 New Raymer West 01/09/20 400.00 180.00 210.63 188.50 FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 21.00 150.00 380.14 480.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 161.00 220.00 210.00 210.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 2,343.00 165.00 181.20 220.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 167.00 335.00 333.64 330.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STA006A-067 SH 6 Merino to Atwood 01/16/20 600.00 180.00 158.26 175.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 165 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-00720 HMA (Patching) (Asph) Ton ==================================================== STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 50.00 200.00 253.50 207.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 481.00 120.00 149.56 159.11 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 50.00 130.00 252.50 300.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 132.00 300.00 382.26 339.51 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 1,294.00 185.00 193.00 176.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 100.00 200.00 161.59 150.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 500.00 175.00 145.76 128.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 2,499.00 125.00 144.42 108.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 500.00 135.00 186.50 150.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 40.00 300.00 260.00 260.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 10.00 150.00 552.67 642.79 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 22.00 300.00 463.33 540.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 500.00 175.00 183.08 170.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 163.00 200.00 246.70 196.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 184.00 300.00 196.40 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10,217.00 166.11 182.45 172.35 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 337.00 220.00 208.43 248.18 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 693.00 175.00 203.50 200.00 IM0761-226 I76/SH52 Interchange 04/02/20 212.00 220.00 164.24 145.75 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 320.00 150.00 164.72 164.44 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 155.40 130.00 179.55 110.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 25.00 190.00 225.50 398.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 100.00 250.00 334.50 203.50 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 1,540.00 120.00 260.33 263.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 700.00 180.00 139.89 140.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 20.00 250.00 336.67 405.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 48.00 335.00 362.03 360.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 10.00 230.00 404.33 395.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 30.00 200.00 226.97 226.97 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 15.10 500.00 435.80 346.49 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4,205.50 163.53 199.98 213.42 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 20.00 180.00 355.75 500.00 STMM086-083 ADA PUEBLO METRO 07/09/20 295.00 150.00 412.50 325.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 309.00 200.00 177.50 180.00 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 55.00 200.00 176.80 150.00 IM0252-498 I-25 Maintenance Region 2 Pue 08/19/20 600.00 156.52 156.52 156.52 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 8.00 369.91 280.98 270.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 166 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-00720 HMA (Patching) (Asph) Ton ==================================================== STM094A-038 SH94 WB PASSING LANE 09/01/20 380.00 147.66 147.66 147.66 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 507.00 300.00 304.83 310.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 498.00 275.00 259.86 84.29 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 40.00 200.00 223.43 140.00 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 165.00 150.00 468.17 290.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 300.00 150.00 229.51 235.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 136.00 240.00 262.69 213.80 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 10.00 250.00 540.33 747.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 533.00 152.69 163.38 163.38 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,856.00 196.31 269.75 199.34 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18,278.50 171.88 205.56 187.49 =============== 403-00721 HMA (Patching) (Asph) Sq Yard ================================================ FSA2873-194 US 287 Longmont Intersection 02/13/20 20.00 250.00 275.83 285.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 157.00 75.00 204.50 268.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 100.00 100.00 123.03 79.08 NHPP0502-082 US 50 MONTROSE RE CHIP SEAL 03/05/20 100.00 250.00 162.50 200.00 STRR300-249 Grand and Jackson Counties AD 03/05/20 737.00 75.00 144.67 141.00 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 11.00 150.00 130.88 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,125.00 96.62 154.87 160.82 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 100.00 165.00 136.54 162.22 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 1,540.00 50.00 32.13 31.40 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 500.00 100.00 99.25 149.00 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 396.00 175.00 157.50 65.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 28.00 450.00 290.00 305.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,564.00 87.91 62.82 67.61 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 25.00 300.00 195.76 150.00 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 36.00 175.00 153.33 180.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 45.00 300.00 228.00 250.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 75.00 150.00 101.67 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 181.00 212.98 161.13 126.96 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,870.00 96.29 90.75 97.48 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 167 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-00800 Emerg Pothole Rep Ton ==================================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 30.00 400.00 280.79 143.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 30.00 400.00 280.79 143.00 IM0252-498 I-25 Maintenance Region 2 Pue 08/19/20 90.00 268.51 268.51 268.51 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 90.00 268.51 268.51 268.51 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 120.00 301.38 277.44 237.13 =============== 403-05000 HMA (RCI) Ton ==================================================== STA0142-066 SH 14 New Raymer West 01/09/20 11,208.00 183.00 185.00 170.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11,208.00 183.00 185.00 170.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,208.00 183.00 185.00 170.00 =============== 403-09221 SMA (Fibers)(Asph) Ton ==================================================== STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 16,176.00 140.00 146.10 132.24 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 287.00 250.00 230.60 281.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16,463.00 141.92 149.68 134.83 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16,463.00 141.92 149.68 134.83 =============== 403-09500 Furnish HMA Ton ==================================================== IM0252-498 I-25 Maintenance Region 2 Pue 08/19/20 90.00 114.04 114.04 114.04 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 90.00 114.04 114.04 114.04 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 90.00 114.04 114.04 114.04 =============== 403-33721 HMA (Gr S) (75) (PG 58-28) Ton ==================================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 45,523.00 85.00 87.85 80.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 45,523.00 85.00 87.85 80.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 45,523.00 85.00 87.85 80.50 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 168 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-33731 HMA (Gr S) (75) (PG 58-34) Ton ==================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 239.00 140.00 175.00 175.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 239.00 140.00 175.00 175.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 239.00 140.00 175.00 175.00 =============== 403-33841 HMA (Gr S) (100) (PG 64-22) Ton ==================================================== SHE 0703-461 I-70 and Kipling North Phase 03/26/20 193.00 200.00 146.80 114.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 193.00 200.00 146.80 114.00 IM0761-226 I76/SH52 Interchange 04/02/20 618.00 123.00 108.21 122.96 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 667.14 100.00 101.84 88.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,285.14 111.06 104.69 104.81 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 268.00 110.00 164.00 183.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1,738.00 110.00 92.71 78.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,006.00 110.00 95.72 92.03 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,484.14 115.38 101.55 97.96 =============== 403-34701 HMA (Gr SX) (75) Ton ==================================================== STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 5,205.00 72.00 85.90 76.80 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 22,811.00 70.00 53.25 49.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 18,248.00 85.00 121.67 130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 46,264.00 76.14 90.13 84.08 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 22,842.57 55.00 73.10 55.50 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 169 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-34701 HMA (Gr SX) (75) Ton ==================================================== STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 4,036.00 80.00 81.23 75.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 35,472.00 60.00 67.83 65.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 62,350.57 59.46 69.85 62.68 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 108,614.57 66.57 77.08 71.79 =============== 403-34721 HMA (Gr SX) (75) (PG 58-28) Ton ==================================================== NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 37,383.00 80.00 82.82 88.64 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 43,041.00 95.00 93.33 89.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 21,860.70 80.00 87.50 86.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 33,015.00 85.00 84.62 79.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 24,478.00 75.00 80.77 62.30 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 17,480.00 1821625.00 103.00 103.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 345.00 85.00 193.10 187.72 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 177,602.70 179363.85 87.84 84.59 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 3,152.00 95.00 133.61 112.22 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,152.00 95.00 133.61 112.22 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 13.90 100.00 570.00 350.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 228.00 110.00 239.86 200.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 1,579.00 120.00 151.68 180.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 2,445.00 89.71 89.71 89.71 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 4,917.00 100.00 147.55 153.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 9,333.00 124.00 118.29 116.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 18,515.90 112.57 131.04 129.05 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 199,270.60 159872.50 96.99 89.15 =============== 403-34731 HMA (Gr SX) (75) (PG 58-34) Ton ==================================================== NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 87,233.00 82.00 88.92 83.27 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 87,233.00 82.00 88.92 83.27 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 170 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-34731 HMA (Gr SX) (75) (PG 58-34) Ton ==================================================== NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 21,004.00 109.00 110.21 109.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 21,004.00 109.00 110.21 109.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 108,237.00 87.24 93.05 88.26 =============== 403-34741 HMA (Gr SX) (75) (PG 64-22) Ton ==================================================== STR141A-044 SH 141 AND SH 145, FROM SLICK 01/30/20 78,571.00 78.00 88.96 76.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 78,571.00 78.00 88.96 76.50 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 4,251.00 97.00 95.38 90.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 65.16 200.00 303.67 350.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 3,517.00 92.00 92.95 92.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7,833.16 95.61 96.23 93.49 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 2,271.00 92.14 98.59 98.59 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,271.00 92.14 98.59 98.59 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 88,675.16 79.92 89.65 78.57 =============== 403-34751 HMA (Gr SX) (75) (PG 64-28) Ton ==================================================== STA0142-066 SH 14 New Raymer West 01/09/20 25,496.00 83.00 93.40 88.60 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 52,375.00 82.00 110.58 97.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 1,734.00 160.00 151.32 136.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STA006A-067 SH 6 Merino to Atwood 01/16/20 32,095.00 84.50 106.48 88.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 86,105.00 84.00 99.13 98.25 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 20,982.00 80.00 100.39 91.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 218,787.00 83.70 102.75 94.97 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 171 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-34751 HMA (Gr SX) (75) (PG 64-28) Ton ==================================================== C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 171.00 95.00 169.45 205.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 3,358.00 115.00 99.73 93.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 1,627.00 160.00 154.76 142.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1,115.00 95.00 96.19 96.19 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6,271.00 122.57 119.15 109.33 STM094A-038 SH94 WB PASSING LANE 09/01/20 1,088.00 105.92 105.92 105.92 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 693.00 95.30 101.97 101.97 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,781.00 101.79 104.38 104.38 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 226,839.00 84.91 103.74 95.45 =============== 403-34801 HMA (Gr SX) (100) Ton ==================================================== HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 665.00 150.00 114.83 84.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 665.00 150.00 114.83 84.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 665.00 150.00 114.83 84.00 =============== 403-34841 HMA (Gr SX) (100) (PG 64-22) Ton ==================================================== MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 3,736.00 110.00 72.50 65.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,736.00 110.00 72.50 65.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,736.00 110.00 72.50 65.50 =============== 403-34851 HMA (Gr SX) (100) (PG 64-28) Ton ==================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 36,086.00 90.00 108.94 97.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 36,086.00 90.00 108.94 97.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 172 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-34851 HMA (Gr SX) (100) (PG 64-28) Ton ==================================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 2,032.26 136.89 146.47 146.47 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,032.26 136.89 146.47 146.47 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 38,118.26 92.50 109.63 99.64 =============== 403-34871 HMA (Gr SX) (100) (PG 76-28) Ton ==================================================== NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 1,008.00 200.00 123.50 140.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 31,730.00 80.00 93.75 80.25 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 56.00 200.00 219.80 235.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 32,794.00 83.89 94.73 82.35 IM0761-226 I76/SH52 Interchange 04/02/20 1,251.00 150.00 132.46 137.48 SFTY2254-091 225 Ramp Improvements 04/09/20 185.00 175.00 240.00 180.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 251.00 110.00 153.08 143.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,687.00 146.79 139.75 142.96 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 339.00 175.00 273.50 372.00 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 1,716.00 115.00 85.92 80.60 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1,345.00 100.00 110.86 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,400.00 115.05 105.30 113.37 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 37,881.00 89.49 100.22 87.83 =============== 403-36621 HMA (Gr ST)(50)(PG 58-28) Ton ==================================================== STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 30,279.00 109.00 98.00 96.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 12,473.20 85.00 99.50 93.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 20,768.00 85.00 88.33 85.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 63,520.20 96.44 94.83 91.81 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 63,520.20 96.44 94.83 91.81 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 173 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-36701 HMA (Gr ST)(75) Ton ==================================================== C0641-106 SH 64 Meeker West Rural Resur 03/05/20 16,390.00 72.00 60.05 53.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16,390.00 72.00 60.05 53.00 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 13,933.50 70.00 85.75 63.50 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 23,733.00 65.00 72.71 70.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 37,666.50 66.85 75.67 67.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 54,056.50 68.41 72.38 63.30 =============== 403-36721 HMA (Gr ST)(75)(PG 58-28) Ton ==================================================== STR141A-044 SH 141 AND SH 145, FROM SLICK 01/30/20 23,663.00 85.00 105.47 86.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 9,865.00 811155.00 105.00 105.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 33,528.00 238727.49 105.44 91.59 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 15,009.00 110.00 113.93 108.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 15,009.00 110.00 113.93 108.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 48,537.00 164940.28 107.64 96.82 =============== 405-00100 Heating and Remixing Treatment Sq Yard ================================================ NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 673,117.00 4.20 3.58 3.23 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 673,117.00 4.20 3.58 3.23 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 673,117.00 4.20 3.58 3.23 =============== 408-01000 Hot Joint-Crack Sealant Ton ==================================================== NHPP0502-082 US 50 MONTROSE RE CHIP SEAL 03/05/20 45.00 4000.00 5275.00 3600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 45.00 4000.00 5275.00 3600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 45.00 4000.00 5275.00 3600.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 174 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 408-01100 Joint Sealant Lin Foot =============================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 3,206.00 13.00 26.76 27.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 386.00 20.00 19.02 25.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 241.00 25.00 20.00 25.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 429.00 28.00 30.50 28.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,262.00 15.82 25.41 26.81 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 192.00 25.00 31.32 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 192.00 25.00 31.32 11.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 88.00 20.00 41.57 25.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1,745.64 10.00 19.05 19.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,833.64 10.48 24.92 19.34 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,287.64 14.54 25.93 24.15 =============== 409-01015 CC Matl (Ty I) Sq Yard ================================================ NHPP0502-082 US 50 MONTROSE RE CHIP SEAL 03/05/20 1,107,884.00 0.88 1.31 0.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,107,884.00 0.88 1.31 0.85 NHPP1601-077 US 160 MP 29.750 - MP 34.891 04/09/20 130,383.00 1.10 0.93 0.75 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 191,375.00 1.25 1.37 1.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 321,758.00 1.19 1.19 1.02 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,429,642.00 0.95 1.29 0.89 =============== 409-02015 CC Matl (Ty II) Sq Yard ================================================ NHPP1601-077 US 160 MP 29.750 - MP 34.891 04/09/20 130,383.00 1.25 0.97 0.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 130,383.00 1.25 0.97 0.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 130,383.00 1.25 0.97 0.75 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 175 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 409-09000 Micro-Surfacing Seal Coat Ton ==================================================== NHPP1601-077 US 160 MP 29.750 - MP 34.891 04/09/20 2,054.00 350.00 241.67 210.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,054.00 350.00 241.67 210.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,054.00 350.00 241.67 210.00 =============== 411-03352 Asph Cem (PG 58-28) Ton ==================================================== C0641-106 SH 64 Meeker West Rural Resur 03/05/20 1,108.00 550.00 360.00 300.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 710.00 600.00 533.33 580.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,818.00 569.53 444.95 409.35 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 982.27 500.00 427.50 410.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 1,403.00 450.00 424.92 405.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,385.27 470.59 425.59 407.06 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,203.27 513.38 432.64 408.05 =============== 411-03354 Asph Cem (PG 64-22) Ton ==================================================== HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 41.00 550.00 554.55 645.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 41.00 550.00 554.55 645.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 244.00 325.00 472.83 475.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 244.00 325.00 472.83 475.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 285.00 357.37 481.07 499.46 =============== 411-03355 Asph Cem (PG 58-34) Ton ==================================================== STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 312.00 700.00 512.50 625.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 176 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 411-03355 Asph Cem (PG 58-34) Ton ==================================================== C0641-106 SH 64 Meeker West Rural Resur 03/05/20 1,371.00 650.00 460.00 400.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 383.00 700.00 636.67 690.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,066.00 666.82 512.21 487.74 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 1,337.26 440.00 507.50 500.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 1,937.00 550.00 508.32 485.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,274.26 505.07 508.11 491.13 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,340.26 567.65 509.35 489.82 =============== 411-10216 Emul Asph (CRS-2P) Gallon ================================================= NHPP0502-082 US 50 MONTROSE RE CHIP SEAL 03/05/20 432,075.00 2.25 2.63 2.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 432,075.00 2.25 2.63 2.05 NHPP1601-077 US 160 MP 29.750 - MP 34.891 04/09/20 86,053.00 2.50 3.29 3.75 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 69,263.00 2.75 2.40 1.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 155,316.00 2.61 2.89 2.84 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 587,391.00 2.35 2.68 2.26 =============== 411-10253 Emul Asph (CSS-1H) Gallon ================================================= NHPP0502-082 US 50 MONTROSE RE CHIP SEAL 03/05/20 121,867.24 2.25 2.13 1.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 121,867.24 2.25 2.13 1.35 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 19,536.00 3.50 1.57 0.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 19,536.00 3.50 1.57 0.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 141,403.24 2.42 2.07 1.27 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 177 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 411-10255 Emul Asph (SS) Gallon ================================================= SHER500-210 R5 FY19 CENTER LINE RUMBLE ST 01/09/20 6,077.00 3.00 12.88 17.50 STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 3,112.00 2.75 2.75 3.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 24,679.00 3.00 1.95 3.40 STR141A-044 SH 141 AND SH 145, FROM SLICK 01/30/20 56,560.00 3.50 3.25 3.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 4,851.00 5.00 7.49 3.48 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 41,988.00 2.80 1.45 1.90 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 48,362.00 4.00 2.38 3.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 21,601.00 3.00 3.50 4.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 35,946.00 4.00 2.07 3.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 11,694.00 3.50 4.76 4.70 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 34,770.00 4.00 3.42 2.50 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 18,854.00 3.00 4.00 5.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 10,016.00 24606.00 4.50 4.50 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 105.00 4.00 17.86 19.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 13,667.00 7.00 5.42 5.50 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 19,408.00 3.50 8.08 3.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 100.00 6.00 8.30 4.50 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 111.00 4.00 7.40 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 351,901.00 703.89 3.84 3.48 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 23,741.00 3.00 3.08 2.17 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 26,216.00 4.00 2.50 2.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 1,892.00 4.10 3.62 3.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 77,645.00 3.00 2.55 2.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1,105.00 4.50 3.24 3.30 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 155.00 4.00 22.05 4.50 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 391.00 7.00 5.00 5.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 2,247.00 5.00 3.57 3.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 133,392.00 3.27 2.71 2.09 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 9.00 6.00 21.50 25.00 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 3,715.00 4.00 4.25 5.85 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 953.00 6.95 6.50 11.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 1,885.00 2.71 2.71 2.71 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1,051.00 5.00 6.50 6.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 1,161.00 5.00 5.79 5.85 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 4,145.00 4.00 3.24 2.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12,919.00 4.20 4.42 4.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 498,212.00 498.16 3.55 3.14 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 178 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 411-90010 Asph Rejuvenating Agent Gallon ================================================= NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 29,526.00 3.50 2.76 3.03 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 29,526.00 3.50 2.76 3.03 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 29,526.00 3.50 2.76 3.03 =============== 412-00190 Conc Pvmt (Patching) Sq Yard ================================================ FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 100.00 200.00 300.33 300.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 6,227.00 135.00 345.50 250.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 117.00 150.00 315.00 105.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 5.00 300.00 583.60 842.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6,449.00 136.41 343.35 248.60 IM0761-226 I76/SH52 Interchange 04/02/20 174.00 250.00 263.27 130.48 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 19.00 310.00 282.00 225.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 12.00 300.00 337.83 161.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 205.00 258.49 266.13 141.03 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 271.00 175.00 191.28 110.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 271.00 175.00 191.28 110.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,925.00 141.53 324.32 240.01 =============== 412-00600 Conc Pvmt (6 In) Sq Yard ================================================ BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 56.00 77.00 131.19 260.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 150.00 100.00 162.13 115.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 265.00 80.00 83.71 81.11 STRR300-249 Grand and Jackson Counties AD 03/05/20 329.00 150.00 135.00 98.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 31.00 150.00 154.20 114.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 831.00 113.73 133.14 107.20 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 179 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 412-00600 Conc Pvmt (6 In) Sq Yard ================================================ IM0761-226 I76/SH52 Interchange 04/02/20 38.00 130.00 100.83 52.88 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 88.00 120.00 184.33 99.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 126.00 123.02 142.42 85.09 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 58.00 150.00 120.00 120.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 97.00 100.00 100.54 78.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 105.00 105.00 109.00 84.98 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 304.00 114.00 99.57 67.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 564.00 113.62 102.23 77.69 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,521.00 114.46 118.14 94.42 =============== 412-00605 Conc Pvmt (6 In) (Fast Track) Sq Yard ================================================ CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 42.00 200.00 122.41 122.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 42.00 200.00 122.41 122.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 42.00 200.00 122.41 122.00 =============== 412-00700 Conc Pvmt (7 In) Sq Yard ================================================ STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 116,631.00 35.00 41.29 34.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 116,631.00 35.00 41.29 34.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 116,631.00 35.00 41.29 34.80 =============== 412-00701 Conc Pvmt (7 In) (Spec) Sq Yard ================================================ STMM086-083 ADA PUEBLO METRO 07/09/20 1,238.00 100.00 126.50 113.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,238.00 100.00 126.50 113.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,238.00 100.00 126.50 113.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 180 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 412-00800 Conc Pvmt (8 In) Sq Yard ================================================ FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 1,385.00 100.00 80.00 80.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 309.00 130.00 134.33 147.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,694.00 105.47 101.79 92.22 FSAC010-124 US 40, US 287, SH 88 08/06/20 17.00 200.00 165.33 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 17.00 200.00 165.33 200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,711.00 106.41 103.16 93.29 =============== 412-00801 Conc Pvmt (8 In) (Spec) Sq Yard ================================================ FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 456.00 160.00 110.00 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 456.00 160.00 110.00 110.00 IM0761-226 I76/SH52 Interchange 04/02/20 2,232.00 105.00 109.54 110.64 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,232.00 105.00 109.54 110.64 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,688.00 114.33 109.55 110.53 =============== 412-00805 Conc Pvmt (8 In) (Fast Track) Sq Yard ================================================ C1601-082 Hawkins Signal and Curb Ramps 04/30/20 316.00 150.00 197.67 168.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 316.00 150.00 197.67 168.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 316.00 150.00 197.67 168.00 =============== 412-00815 Conc Pvmt (8 In) (R) Sq Yard ================================================ NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1,074.00 200.00 125.00 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,074.00 200.00 125.00 120.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,074.00 200.00 125.00 120.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 181 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 412-00850 Conc Pvmt (8-1/2 In) Sq Yard ================================================ FSA2873-194 US 287 Longmont Intersection 02/13/20 1,979.00 88.00 135.83 91.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,979.00 88.00 135.83 91.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 15,501.00 50.00 52.87 45.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 15,501.00 50.00 52.87 45.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17,480.00 54.30 62.26 50.56 =============== 412-00870 Conc Pvmt (8-1/2 In) (Fast Track) Sq Yard ================================================ FSA2873-194 US 287 Longmont Intersection 02/13/20 89.00 125.00 298.17 104.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 89.00 125.00 298.17 104.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 89.00 125.00 298.17 104.00 =============== 412-00900 Conc Pvmt (9 In) Sq Yard ================================================ NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 8,664.00 82.00 84.43 95.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 692.00 90.00 142.85 147.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9,356.00 82.59 87.39 98.88 IM0761-226 I76/SH52 Interchange 04/02/20 36,648.00 72.00 74.38 60.25 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 118,410.00 35.00 57.04 40.46 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 155,058.00 43.74 60.74 45.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 164,414.00 45.96 61.33 48.20 =============== 412-00920 Conc Pvmt (9 In) (Fast Track) Sq Yard ================================================ HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1,796.00 120.00 145.70 150.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,796.00 120.00 145.70 150.05 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,796.00 120.00 145.70 150.05 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 182 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 412-01000 Conc Pvmt (10 In) Sq Yard ================================================ C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 27.00 200.00 161.50 158.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 27.00 200.00 161.50 158.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 7,555.00 125.00 130.67 132.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 130.00 175.00 166.67 180.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7,685.00 125.85 131.28 132.81 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,712.00 126.11 131.35 132.90 =============== 412-01001 Conc Pvmt (10 In) (Spec) Sq Yard ================================================ FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 123.00 160.00 177.67 178.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 123.00 160.00 177.67 178.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 123.00 160.00 177.67 178.00 =============== 412-01020 Conc Pvmt (10 In) (Fast Track) Sq Yard ================================================ C1601-082 Hawkins Signal and Curb Ramps 04/30/20 81.00 160.00 241.67 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 81.00 160.00 241.67 200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 81.00 160.00 241.67 200.00 =============== 412-01050 Conc Pvmt (10-1/2 In) Sq Yard ================================================ SHE 0703-461 I-70 and Kipling North Phase 03/26/20 661.00 175.00 170.20 151.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 661.00 175.00 170.20 151.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1,593.00 150.00 148.00 88.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,593.00 150.00 148.00 88.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,254.00 157.33 153.08 106.48 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 183 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 412-01100 Conc Pvmt (11 In) Sq Yard ================================================ STR2871-038 US 287 Passing Lanes Springfi 03/05/20 31,992.00 65.00 63.65 61.37 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 31,992.00 65.00 63.65 61.37 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 31,992.00 65.00 63.65 61.37 =============== 412-01120 Conc Pvmt (11 In) (Fast Track) Sq Yard ================================================ SHE 0703-461 I-70 and Kipling North Phase 03/26/20 168.00 200.00 249.80 142.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 168.00 200.00 249.80 142.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 300.00 175.00 205.50 115.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 352.00 135.00 202.67 113.33 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 652.00 153.40 204.10 114.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 820.00 162.95 212.82 119.81 =============== 412-01200 Conc Pvmt (12 In) Sq Yard ================================================ FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 1,694.00 62.00 118.28 130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,694.00 62.00 118.28 130.00 IM0761-226 I76/SH52 Interchange 04/02/20 2,465.00 110.00 93.33 66.51 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,465.00 110.00 93.33 66.51 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,159.00 90.45 99.00 92.37 =============== 412-01250 Conc Pvmt (12-1/2 In) Sq Yard ================================================ SFTY2254-091 225 Ramp Improvements 04/09/20 5,987.00 120.00 146.00 112.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,987.00 120.00 146.00 112.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,987.00 120.00 146.00 112.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 184 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 412-01255 Conc Pvmt (12 In) (Spec) Sq Yard ================================================ BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 441.00 765.00 273.29 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 441.00 765.00 273.29 200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 441.00 765.00 273.29 200.00 =============== 412-02000 Conc Safety Edge Lin Foot =============================================== STR2871-038 US 287 Passing Lanes Springfi 03/05/20 13,315.00 4.00 3.11 3.52 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 13,315.00 4.00 3.11 3.52 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 23,634.00 5.00 3.18 2.72 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 23,634.00 5.00 3.18 2.72 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 36,949.00 4.64 3.17 3.01 =============== 412-11000 Conc Pave Dowel Bar Retro Each =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 1,032.00 110.00 90.68 130.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 3,138.00 120.00 135.00 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,170.00 117.53 120.36 145.05 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,170.00 117.53 120.36 145.05 =============== 412-15000 Routing and Sealing Cracks Lin Foot =============================================== NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 1,099.00 45.00 16.00 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,099.00 45.00 16.00 25.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,099.00 45.00 16.00 25.00 =============== 412-16000 Cleaning + Sealing Joints Lin Foot =============================================== NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 117,066.00 3.50 2.08 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 117,066.00 3.50 2.08 3.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 117,066.00 3.50 2.08 3.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 185 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 420-00000 Geomembrane Sq Yard ================================================ NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 840.00 30.00 27.23 13.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 2,483.00 40.00 12.82 13.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,323.00 37.47 14.44 13.30 IM0761-226 I76/SH52 Interchange 04/02/20 225.00 15.00 19.56 5.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 225.00 15.00 19.56 5.30 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 12,235.00 8.71 9.54 9.54 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12,235.00 8.71 9.54 9.54 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15,783.00 14.86 13.01 10.27 =============== 420-00102 Geotextile (Er Cont) (CL 1) Sq Yard ================================================ STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 1,692.00 4.00 2.50 2.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 350.00 8.00 5.40 2.77 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,042.00 4.69 3.72 2.13 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 4,630.00 6.00 4.54 5.68 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 850.00 2.00 4.32 4.32 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,480.00 5.38 4.54 5.47 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 365.00 5.00 6.64 3.24 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 442.00 6.00 7.00 7.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 45.00 4.00 36.00 65.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 311.00 6.81 7.93 8.50 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 186 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 420-00102 Geotextile (Er Cont) (CL 1) Sq Yard ================================================ NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 35.00 8.00 37.05 37.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,198.00 5.89 7.99 9.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,720.00 5.29 4.81 5.21 =============== 420-00103 Geotextile (Er Cont) (CL 2) Sq Yard ================================================ NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 378.00 6.00 7.17 5.28 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 378.00 6.00 7.17 5.28 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 19.00 15.00 21.33 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 19.00 15.00 21.33 25.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 397.00 6.43 7.85 6.22 =============== 420-00112 Geotextile (Drain) (CL 1) Sq Yard ================================================ NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 57.00 6.00 14.15 11.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 1,969.00 5.50 4.38 4.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 233.00 4.00 5.25 5.25 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 181.00 8.00 8.19 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,440.00 5.55 4.92 4.36 IM0761-226 I76/SH52 Interchange 04/02/20 679.00 4.00 7.12 1.52 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 850.00 6.00 3.35 2.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,529.00 5.11 4.79 2.15 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 16.00 6.00 13.00 6.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 16.00 6.00 13.00 6.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,985.00 5.39 4.87 3.52 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 187 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 420-00113 Geotextile (Drain) (CL 2) Sq Yard ================================================ NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 927.00 8.00 4.86 6.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 48.00 6.00 49.28 5.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 975.00 7.90 5.43 5.97 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 4.00 70.00 98.33 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 70.00 98.33 45.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 16.00 38.27 38.27 38.27 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 16.00 38.27 38.27 38.27 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 995.00 8.64 5.64 6.64 =============== 420-00114 Geotextile (Drain) (CL 3) Sq Yard ================================================ FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 1,036.00 8.00 7.00 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,036.00 8.00 7.00 7.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,036.00 8.00 7.00 7.00 =============== 420-00132 Geotextile (Separator) (CL 1) Sq Yard ================================================ NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 84,446.00 2.00 2.94 2.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 84,446.00 2.00 2.94 2.30 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 10,332.00 5.00 5.17 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10,332.00 5.00 5.17 5.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 94,778.00 2.33 3.03 2.59 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 188 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 420-00133 Geotextile (Separator) (CL 2) Sq Yard ================================================ STR184B-006 CULVERTS SH 184 08/06/20 70.00 40.00 21.00 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 70.00 40.00 21.00 21.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 70.00 40.00 21.00 21.00 =============== 420-00200 Geotextile (Weed Barrier) Sq Yard ================================================ NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 359.00 7.00 7.33 1.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 359.00 7.00 7.33 1.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 359.00 7.00 7.33 1.60 =============== 420-00300 Geotextile (Reinforcement) Sq Yard ================================================ C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 2,298.00 6.00 7.07 5.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,298.00 6.00 7.07 5.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,298.00 6.00 7.07 5.25 =============== 420-00520 Geogrid Pvmt Reinf Sq Yard ================================================ NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 4,257.00 13.00 3.88 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,257.00 13.00 3.88 4.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,257.00 13.00 3.88 4.00 =============== 501-00200 Steel Sheet Pile (Ty II) Sq Foot ================================================ NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 1,337.00 55.00 43.77 28.44 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,337.00 55.00 43.77 28.44 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,337.00 55.00 43.77 28.44 =============== 502-00100 Drill Hole Fac Pile Driving Lin Foot =============================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 640.00 50.00 42.36 47.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 640.00 50.00 42.36 47.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 640.00 50.00 42.36 47.60 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 189 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 502-00460 Pile Tip Each =================================================== BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 28.00 175.00 220.83 250.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 32.00 180.00 189.33 133.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 60.00 177.67 201.81 187.60 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 14.00 200.00 216.67 357.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 16.00 200.00 292.66 250.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 52.00 161.00 186.74 186.74 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 82.00 175.27 247.14 228.24 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 56.00 180.00 196.07 225.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 180.00 179.65 230.77 230.77 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 236.00 179.73 206.99 229.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 378.00 178.44 214.79 222.51 =============== 502-00500 CJP Splice Each =================================================== BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 28.00 600.00 584.47 1.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 32.00 300.00 887.77 1.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 60.00 440.00 767.59 1.05 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 14.00 1000.00 771.24 467.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 16.00 600.00 659.18 1.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 2.00 700.00 1321.47 1321.47 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 32.00 781.25 712.96 287.62 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 56.00 400.00 448.73 1.00 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 190 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 502-00500 CJP Splice Each =================================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 32.00 660.75 1320.79 1320.79 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 88.00 494.82 514.55 480.92 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 180.00 527.47 657.84 286.60 =============== 502-02010 Dynamic Pile Test Each =================================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 2.00 3504.00 3798.49 3700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 3504.00 3798.49 3700.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 4.00 2700.00 2675.00 2675.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 2700.00 2675.00 2675.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 26.00 2500.00 2867.60 2867.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 26.00 2500.00 2867.60 2867.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 32.00 2587.75 3174.64 2895.55 =============== 502-11253 Steel Pile (HP 12x53) Lin Foot =============================================== IM0761-226 I76/SH52 Interchange 04/02/20 732.00 95.00 86.42 130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 732.00 95.00 86.42 130.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 732.00 95.00 86.42 130.00 =============== 502-11274 Steel Pile (HP 12x74) Lin Foot =============================================== BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 1,407.00 90.00 83.08 90.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1,168.00 80.00 88.74 79.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,575.00 85.46 86.05 85.12 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 191 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 502-11274 Steel Pile (HP 12x74) Lin Foot =============================================== FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 584.00 95.00 91.16 95.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 584.00 95.00 91.16 95.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,159.00 87.23 87.22 86.95 =============== 502-11284 Steel Pile (HP 12x84) Lin Foot =============================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 530.00 85.00 125.91 137.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 530.00 85.00 125.91 137.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 530.00 85.00 125.91 137.50 =============== 502-11473 Steel Pile (HP 14x73) Lin Foot =============================================== IM0761-226 I76/SH52 Interchange 04/02/20 97.00 110.00 144.64 185.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 97.00 110.00 144.64 185.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 97.00 110.00 144.64 185.00 =============== 502-11489 Steel Pile (HP 14x89) Lin Foot =============================================== NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1,284.00 102.00 103.38 103.38 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,284.00 102.00 103.38 103.38 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 2,294.00 100.00 92.91 69.95 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 5,572.48 113.36 135.64 135.64 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7,866.48 109.46 103.92 116.48 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,150.48 108.42 103.89 114.64 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 192 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 502-14117 Steel Pile (HP 14x117) Lin Foot =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1,406.00 135.21 161.14 161.14 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,406.00 135.21 161.14 161.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,406.00 135.21 161.14 161.14 =============== 503-00012 Drilled Shaft (12 In) Lin Foot =============================================== NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 40.00 150.00 186.33 113.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 40.00 150.00 186.33 113.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 150.00 186.33 113.00 =============== 503-00018 Drilled Shaft (18 In) Lin Foot =============================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 16.00 240.00 399.13 365.00 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 25.00 225.00 255.67 275.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 18.00 200.00 250.00 250.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1,640.00 200.00 220.67 155.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 35.00 220.00 620.61 579.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 10.00 250.00 333.00 336.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 20.00 275.00 208.20 193.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,764.00 202.25 243.50 169.44 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 5.00 200.00 499.00 445.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 20.00 275.00 269.33 133.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 25.00 260.00 315.27 195.40 FSAC010-124 US 40, US 287, SH 88 08/06/20 6.00 250.00 318.33 210.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 250.00 318.33 210.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,795.00 203.21 244.71 169.94 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 193 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 503-00024 Drilled Shaft (24 In) Lin Foot =============================================== IM0761-226 I76/SH52 Interchange 04/02/20 12.00 300.00 310.78 349.80 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 60.00 300.00 328.30 275.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 72.00 300.00 324.47 287.88 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 28.00 300.00 300.00 300.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 20.00 300.00 326.27 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 48.00 300.00 313.59 300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 120.00 300.00 321.94 292.73 =============== 503-00036 Drilled Shaft (36 In) Lin Foot =============================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 19.00 550.00 573.10 510.00 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 30.00 415.00 402.67 445.00 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 68.00 500.00 483.74 625.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 1,458.00 400.00 205.00 125.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 114.00 600.00 930.00 360.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 95.00 550.00 575.67 390.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 53.00 800.00 650.18 715.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 57.00 500.00 909.50 952.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 152.00 550.00 388.80 360.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,046.00 447.34 289.82 231.07 IM0761-226 I76/SH52 Interchange 04/02/20 57.00 400.00 372.85 367.82 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 57.00 600.00 411.43 401.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 152.00 360.00 426.87 300.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 76.00 800.00 1115.33 507.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 95.00 350.00 397.33 342.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 75.00 400.00 561.67 385.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 512.00 460.49 500.22 369.82 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 96.00 450.00 535.75 380.50 COLORADO DEPARTMENT OF TRANSPORTATION 14:34 Thursday, November 12, 2020 194 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 503-00036 Drilled Shaft (36 In) Lin Foot =============================================== SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 190.00 300.00 427.50 495.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 96.00 400.00 447.33 375.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 95.00 550.00 609.71 550.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 76.00 200.00 398.53 368.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 553.00 372.60 512.96 446.29 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,111.00 436.22 355.74 292.16 =============== 503-00042 Drilled Shaft (42 In) Lin Foot =============================================== ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 136.00 1200.00 813.50 750.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 17.00 550.00 654.00 467.00 -----------