Colorado Department of Transportation 15:29 Friday, January 22, 2021 1 2020 Cost Data PROJECTS BID FROM 01/01/20 THROUGH 12/31/20 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20200109 SIMON CONTRACTORS 4 $5,477,794.00 99.11 STA0142-066 SH 14 New Raymer West 4 R 20200109 MARTIN MARIETTA MATERIALS 3 $19,964,032.84 114.09 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA R 4 P 20200109 MOUNTAIN CONSTRUCTORS, INC. 1 $1,871,822.50 122.04 FSA0341-097 US 34 & MACGREGOR INTERSECTION 4 M 20200109 HAMON INFRASTRUCTURE, INC. 3 $1,356,000.00 108.39 FSA0253-262 I-25 SB BOTTLENECK I-76 TO I-7 1 U 20200109 STURGEON ELECTRIC COMPANY, INC 3 $756,000.00 96.02 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND OF 4 R 20200109 SURFACE PREPARATION TECHNOLOGIES 2 $887,234.48 113.49 SHER500-210 R5 FY19 CENTER LINE RUMBLE STR 5 R 20200116 ZAK DIRT, INC. 6 $5,310,755.65 101.62 BR0343-040 US 34 REPUBLICAN RIVER BRIDGES 4 P FBR0343-043 US 34 D-28-P STRUCTURE REPLACE 4 P 20200116 Kilgore Companies, LLC dba Elam Construc 2 $1,359,498.00 90.33 STR131A-038 SH 131 MP 51.95-55.73, ROUTT C 3 M 20200116 MCATEE CONSTRUCTION CO. 2 $3,766,927.45 96.38 STA006A-067 SH 6 Merino to Atwood 4 R 20200123 APC SOUTHERN CONSTRUCTION COMPANY, LLC 2 $7,035,527.04 111.68 NH 0503-093 US50 WEST OF TEXAS CREEK MP 25 2 M 20200123 REDLINE PIPELINE, LLC 2 $7,664,700.70 116.13 PWQM240-172 El Paso County, north Colorado 2 R 20200130 OLDCASTLE SW GROUP, INC. 5 $10,688,093.10 92.40 STR141A-044 SH 141 AND SH 145, FROM SLICKR 5 R 20200130 AMERICAN WEST CONSTRUCTION, LLC 1 $547,985.00 110.70 STR012A-050 CULVERT REPAIR I-25 AND US 350 2 P 20200206 MCATEE CONSTRUCTION CO. 2 $12,072,994.45 114.74 STA059A-036 SH 59 SEIBERT TO COPE 4 P 20200206 BRANNAN SAND AND GRAVEL, LLC 2 $5,223,224.95 108.53 STA0703-443 I-70 EJMT TUNNELS PAVING 1 M 20200206 DILLIE AND KUHN, INC. 5 $3,179,048.10 72.30 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 00 P 20200206 AMERICAN CIVIL CONSTRUCTORS, LLC dba A 2 $7,686,500.00 119.92 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESURF 1 U Colorado Department of Transportation 15:29 Friday, January 22, 2021 2 2020 Cost Data PROJECTS BID FROM 01/01/20 THROUGH 12/31/20 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20200206 ROADSAFE TRAFFIC SYSTEMS, INC 2 $3,474,413.60 106.39 MTCER300-257 R3 FY 20/21 Region Wide Epoxy 3 M 20200206 HAMILTON CONSTRUCTION CO. 5 $3,357,952.85 84.13 NHPP4701-134 C-470 NOISE WALL WEST OF LUCEN 1 U 20200213 A and S CONSTRUCTION CO. 2 $5,376,000.00 114.38 STA069A-033 SH69 MP 58.7 TO 71.58 2 M 20200213 DURAN EXCAVATING, INC. 6 $1,160,406.20 106.49 FSA2873-194 US 287 Longmont Intersection I 4 U 20200213 A and S CONSTRUCTION CO. 3 $8,883,000.00 92.53 STR116A-001 SH 116 A Surface Treatment Pro 2 P 20200213 Straight Stripe Painting, Inc. 4 $2,068,435.00 116.92 MTCER500-213 R5 FY 20 / FY 21 STRIPING 5 M 20200227 Casper Electric, Inc. 4 $3,425,884.84 88.90 NHPP0702-359 I-70 No Name Tunnel Lighting 3 M 20200227 Casper Electric, Inc. 2 $1,081,340.90 97.02 C0402-094 US 40 GRAND COUNTY SIGNAL REPL 3 R 20200227 MARTIN MARIETTA MATERIALS 3 $5,351,155.83 113.85 NH0242-085 US 24 M.P. 291.38 to M.P. 296. 2 R 20200227 A and S CONSTRUCTION CO. 3 $6,758,000.00 96.46 STR0101-027 SH 10 Overlay La Junta West 2 P 20200305 APC SOUTHERN CONSTRUCTION COMPANY, LLC 3 $21,320,469.84 95.83 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 1 5 P 20200305 SEMA CONSTRUCTION, INC. 3 $14,138,928.75 119.86 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON SP 3 M 20200305 OLDCASTLE SW GROUP, INC. 4 $3,758,750.22 94.53 NHPP0502-082 US 50 MONTROSE RE CHIP SEAL 3 R 20200305 KSK, LLC 3 $1,400,000.00 110.27 STRR300-249 Grand and Jackson Counties ADA 3 M 20200305 TEZAK HEAVY EQUIPMENT CO., INC. 7 $2,071,985.91 94.18 BR025A-046 K-18-U ON I-25 AT MP112 BRIDGE 2 R 20200305 CASTLE ROCK CONST. CO. OF COLO, LLC 2 $4,519,619.33 100.44 STR2871-038 US 287 Passing Lanes Springfie 2 P 20200305 OLDCASTLE SW GROUP, INC. 1 $4,469,722.20 91.55 NHPP145A-080 SH 145 Keystone-Placerville Re 5 M Colorado Department of Transportation 15:29 Friday, January 22, 2021 3 2020 Cost Data PROJECTS BID FROM 01/01/20 THROUGH 12/31/20 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20200305 KSK, LLC 4 $300,000.00 70.28 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 3 U 20200305 OLDCASTLE SW GROUP, INC. 2 $4,422,918.00 70.62 C0641-106 SH 64 Meeker West Rural Resurf 3 R 20200326 MOUNTAIN VALLEY CONTRACTING, INC. 2 $2,761,591.15 110.11 HPP 0501-067 US 50 AND SH 92 DELTA INTERSEC 3 U 20200326 KIRKLAND CONSTRUCTION, LLLP 8 $32,992,239.13 103.10 NH050A-034 US50A PUEBLO WEST PURCELL INTE 2 R 20200326 DURAN EXCAVATING, INC. 5 $2,391,211.25 96.23 SHE 0703-461 I-70 and Kipling North Phase 1 U 20200402 CASTLE ROCK CONST. CO. OF COLO, LLC 7 $11,765,116.33 89.67 IM0761-226 I76/SH52 Interchange 4 R 20200402 KSK, LLC 3 $1,235,000.00 107.36 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 3 R 20200402 OLDCASTLE SW GROUP, INC. 3 $6,333,543.94 100.47 NHPP1602-169 US 160 WC TUNNEL EAST RESURFAC 5 M 20200402 Kilgore Companies, LLC dba Elam Construc 4 $7,604,366.80 97.23 STR0341-101 SH 34 North of Grandby Resurfa 3 M 20200402 OLDCASTLE SW GROUP, INC. 2 $5,574,468.91 97.49 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 3 M 20200402 ROADSAFE TRAFFIC SYSTEMS, INC 2 $753,924.25 110.04 MTCER300-259 MTCE R3 FY20/21 Region Wide St 3 M 20200409 INTERMOUNTAIN SLURRY SEAL, INC. 3 $1,303,347.00 83.16 NHPP1601-077 US 160 MP 29.750 - MP 34.891 5 R 20200409 ABCO CONTRACTING, INC. 2 $3,226,884.00 76.19 SFTY2254-091 225 Ramp Improvements 1 U 20200409 TRICON 2, LLC 2 $2,277,000.00 103.50 IM0252-473 I-25 CABLE BARRIER PHASE IV 2 R 20200409 CC ENTRPRS TRAFFIC CONTROL SPECIALISTS 1 $2,165,914.00 114.25 SHER100-339 WWD TRAFFIC CONTROL ENHANCEMEN 1 R 20200423 CASTLE ROCK CONST. CO. OF COLO, LLC 8 $23,753,931.10 86.61 CC0852-106 US-85 LOUVIERS TO MP 191.75 1 R FBR0852-108 US-85 BETWEEN LOUVIERS AND MP 1 R 20200423 Lumin8 Transportation Tech. 3 $1,679,401.00 95.54 C1211-090 SH-121 & 29th Ave / SH-121 & S 1 U Colorado Department of Transportation 15:29 Friday, January 22, 2021 4 2020 Cost Data PROJECTS BID FROM 01/01/20 THROUGH 12/31/20 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20200430 CONCRETE WORKS OF COLORADO INC. 3 $5,247,258.00 160.28 FSA1602-159 US 160 AND SH 17 INTERSECTION 5 U 20200430 OLDCASTLE SW GROUP, INC. 3 $1,827,783.00 126.03 C1601-082 Hawkins Signal and Curb Ramps 5 U 20200507 Lumin8 Transportation Tech. 3 $1,762,713.21 93.97 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 1 U 20200507 ZAK DIRT, INC. 8 $1,913,218.60 79.71 C0853-112 US85 & WCR98 INTERSECTION IMPR 4 R 20200507 ZAK DIRT, INC. 9 $2,466,070.75 88.17 FBR0343-042 US 34 D-27-G STRUCTURE REPLACE 4 P 20200514 INTERFACE COMMUNICATIONS COMPANY 4 $2,136,538.00 58.90 ITS SW02-304 ITS FIBER TO STATE BUILDINGS I 00 M 20200514 OLDCASTLE SW GROUP, INC. 3 $1,038,174.50 102.50 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 1 3 M 20200515 RLW/SEMA, A Joint Venture 1 $8,274,649.78 100.59 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 & 4 R 20200521 ROADSAFE TRAFFIC SYSTEMS, INC 2 $12,348,544.30 107.77 MTCE R100-341 Various Highways in Region 1 1 U 20200528 KIRKLAND CONSTRUCTION, LLLP 8 $1,975,485.70 89.79 NH050A-035 US 50A Pueblo Regional Pond 2 R NH050A-037 US 50A Pueblo Regional Pond 2 R 20200528 STURGEON ELECTRIC COMPANY, INC 2 $995,960.00 73.40 SHER400-373 R4 Signal Head Backplate Insta 4 R 20200528 PAONIA, INC 5 $2,221,563.29 57.59 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, S 00 R 20200528 TLM CONSTRUCTORS, INC. 3 $610,899.00 81.45 IM025A-048 Northbound I-25 bridge at Exit 2 M 20200528 HARVEY CONTRACTORS INC 4 $3,254,518.92 95.72 MTCER200-265 Pueblo 2 R 20200611 PAONIA, INC 2 $1,488,325.00 60.77 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 00 P 20200611 Lumin8 Transportation Tech. 3 $630,460.00 91.28 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENTS 4 U 20200618 MAIN ELECTRIC LTD 5 $1,409,599.14 78.31 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 2 U Colorado Department of Transportation 15:29 Friday, January 22, 2021 5 2020 Cost Data PROJECTS BID FROM 01/01/20 THROUGH 12/31/20 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20200623 LAWRENCE CONSTRUCTION CO. 1 $77,748,000.00 100.00 NHPP5501-029 US 550/160 CONNECTION SOUTH DB 5 M 20200625 RALPH L. WADSWORTH CONSTRUCTION CO., LLC 2 $919,658.19 103.51 NHPPR100-251 SH 2/ Vasquez 1 U 20200702 INNOVATIVE MARKING SYSTEMS, INC. 5 $3,429,416.85 83.41 MTCER400-381 REGION 4 FY21 EPOXY 4 R 20200709 MIDWEST ROCKFALL, INC. 4 $2,880,537.20 105.37 C 0741-020 GEOHAZARD SH 74 MORRISON TO EV 1 M 20200709 TEZAK HEAVY EQUIPMENT CO., INC. 6 $570,845.95 63.43 NH0504-908 US50B PUEBLO (MP 318) STR K-18 2 P 20200709 VmCo Inc 4 $663,037.00 66.76 MTCER300-255 MTCE R3 FY20/21 Signal Replace 3 M 20200709 NORAA CONCRETE CONSTRUCTION CORPORATION 2 $2,523,898.00 143.37 STMM086-083 ADA PUEBLO METRO 2 U 20200709 MORTON ELECTRIC, INC. 6 $756,948.90 82.72 ITS 070A-033 I-70 FROM BENNETT TO BURLINGTO 00 P 20200709 AMERICAN WEST CONSTRUCTION, LLC 3 $537,943.45 97.81 STR012A-053 CRITICAL CULVERT REPAIR CO 12 2 M 20200709 KOLBE STRIPING INC. 3 $385,150.00 95.70 MTCER300-258 MTCE R3 FY20 Region Roundabout 3 M 20200723 AMERICAN CIVIL CONSTRUCTORS, LLC dba A 1 $357,160.00 76.64 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOUR 5 R 20200723 Frontier Environmental Services, LLC 2 $424,274.00 58.52 STMR200-249 US 24, M.P. 288.74; SH 115, M. 2 R 20200723 Frontier Environmental Services, LLC 2 $568,652.50 78.43 STMR200-260 R2 - 2020 CRITICAL CULVERT 2 M 20200806 AMERICAN WEST CONSTRUCTION, LLC 1 $497,913.75 99.61 STR184B-006 CULVERTS SH 184 5 M 20200806 Lumin8 Transportation Tech. 3 $804,665.40 80.57 FSAC010-124 US 40, US 287, SH 88 1 U 20200806 APC CONSTRUCTION CO., LLC 5 $888,362.00 71.07 MTCE R100-334 ZANG STREET AND COAL CREEK YAR 1 U 20200806 STURGEON ELECTRIC COMPANY, INC 2 $2,863,242.00 108.48 SHER100-345 SIGNAL CONST PACKAGE B - 21793 1 U Colorado Department of Transportation 15:29 Friday, January 22, 2021 6 2020 Cost Data PROJECTS BID FROM 01/01/20 THROUGH 12/31/20 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20200819 SEMA CONSTRUCTION, INC. 1 $213,123.88 100.00 IM0252-498 I-25 Maintenance Region 2 Pueb 2 U 20200820 Myers and Sons Construction, LP 7 $2,348,413.60 65.23 BR2871-036 US 287 BRIDGE PREVENTATIVE MAI 2 P 20200820 KSK, LLC 3 $745,000.00 77.59 CC080-038 VARIOUS ADA RAMPS THROUGHOUT M 3 R 20200820 MORTON ELECTRIC, INC. 2 $541,906.00 108.39 SHER400-379 Signal Head Backplate Install 4 R 20200827 Lobato Construction, LLC 8 $2,200,000.00 100.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 2 R 20200901 SEMA CONSTRUCTION, INC. 1 $3,375,240.32 100.00 STM094A-038 SH94 WB PASSING LANE 2 R 20200903 JALISCO INTERNATIONAL, INC. 6 $2,184,937.00 74.20 C R100-288 R1 CURB RAMPS - PH 2 1 U 20200903 WORK ZONE TRAFFIC CONTROL, LLC 3 $459,500.00 91.91 MTCE0702-386 Grand Junction 3 M 20200903 SEMA CONSTRUCTION, INC. 7 $3,170,523.00 89.72 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 1 U 20200903 JALISCO INTERNATIONAL, INC. 5 $1,527,137.78 84.45 C088A-036 R1 ADA CURB RAMPS - 088A, 075B 1 R 20200908 American Civil Constructors West Coast, 5 $795,000.00 108.20 ER0702-406 ER I-7- Glenwood Canyon Grzly 3 M 20200917 MORTON ELECTRIC, INC. 3 $686,555.40 105.62 STM067A-040 SH 67 & KELLY RD SIGNAL IMPROV 2 U 20200917 RALPH L. WADSWORTH CONSTRUCTION CO., LLC 7 $7,975,169.43 93.74 NHPP1602-167 US 160 MP 126.4-128.19 5 M 20200917 AMERICAN WEST CONSTRUCTION, LLC 4 $244,123.00 49.28 CR400-374 FY 20 Culvert Prioritization a 4 P 20200917 SCOTT CONTRACTING INC. 6 $9,897,011.70 94.26 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 2 U 20200917 CEC Infrastructure Group, LLC 2 $2,294,975.00 100.59 SHER100-338 WWD TRAFFIC CONTROL ENHANCEMEN 1 U 20200918 RLW/SEMA, A Joint Venture 1 $35,653,936.55 104.97 NHPP0253-283 I-25 Express Lanes Segment 6 C 4 R Colorado Department of Transportation 15:29 Friday, January 22, 2021 7 2020 Cost Data PROJECTS BID FROM 01/01/20 THROUGH 12/31/20 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20201001 CC ENTRPRS TRAFFIC CONTROL SPECIALISTS 2 $1,314,765.00 87.65 MPC040-061 R2 FY 21 Sign Replacement 2 R 20201008 WORK ZONE TRAFFIC CONTROL, LLC 3 $368,907.00 76.86 MTCE0253-271 FY20 I-25 SIGN REPL PHASE 1 4 R 20201015 Western Gravel Constructors, LLC 3 $1,394,503.00 77.47 STRM331-008 ADA RAMPS WALSENBURG 2 U 20201022 MOUNTAIN VALLEY CONTRACTING, INC. 5 $2,386,292.18 65.52 CC080-030 GRAND JUNCTION RE VARIOUS CULV 3 M 20201022 MAIN ELECTRIC LTD 3 $7,992,798.87 77.17 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 5 M 20201029 Kilgore Companies, LLC dba Elam Construc 3 $10,979,498.85 91.46 NHPP 0702-390 Near MM 185 on I-70 West Vail 3 M 20201029 PAONIA, INC 6 $3,935,021.75 59.09 ITS ITSB-003 ITS FIBER ON I-76 4 P 20201103 ROCK SOLID SOLUTIONS CORPORATION 3 $1,409,512.50 47.77 NHPP0702-407 PR I-70 Glenwood Springs Grizz 3 M 20201112 INSITUFORM TECHNOLOGIES, LLC 4 $801,268.00 80.54 NHPP R100-282 I-25 Culvert on I-25 South of 1 20201112 OLDCASTLE SW GROUP, INC. 3 $5,925,401.90 84.09 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 3 M 20201112 OLDCASTLE SW GROUP, INC. 3 $5,695,942.82 91.02 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 3 M 20201112 INTERFACE COMMUNICATIONS COMPANY 3 $1,062,276.00 55.46 ITSITSB-002 ITS CV ROADSIDE UNITS 00 M 20201112 GOULD CONSTRUCTION, INC. 5 $1,659,315.00 90.14 C0702-398 I-70 GLENWOOD CANYON WALL IMPR 3 M 20201112 INTERFACE COMMUNICATIONS COMPANY 4 $525,794.00 86.80 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 1 20201119 Lumin8 Transportation Tech. 2 $8,920,376.70 104.65 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 1 M 20201119 Lumin8 Transportation Tech. 3 $371,450.00 77.65 FSA1211-098 SH 121 & 1ST AVE 1 U 20201203 A and S CONSTRUCTION CO. 5 $6,188,302.40 98.86 STR0641-104 SH64 RANGELY EAST/US 40 DINOSA 3 M Colorado Department of Transportation 15:29 Friday, January 22, 2021 8 2020 Cost Data PROJECTS BID FROM 01/01/20 THROUGH 12/31/20 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20201203 Geovert, LLC 5 $2,799,915.60 78.14 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 3 M 20201203 SCHMIDT CONSTRUCTION COMPANY 3 $2,629,495.17 93.91 IMM240-180 I-25 RAMPS IN COS RESURFACING 2 U 20201210 APC CONSTRUCTION CO., LLC 3 $4,156,493.22 70.72 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIRE 1 M 20201210 STURGEON ELECTRIC COMPANY, INC 2 $2,786,000.00 103.42 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE) 1 M 20201215 KRAEMER NORTH AMERICA, LLC 1 $9,815,943.86 100.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDGE 1 R 20201217 SCOTT CONTRACTING INC. 6 $19,500,000.00 96.82 NHPP0132-022 SH13 FORTIFICATION CREEK NORTH 3 R 20201217 KSK, LLC 6 $1,276,000.00 98.44 CR100-342 US-6 at Garrison 1 U 20201217 Kilgore Companies, LLC dba Elam Construc 5 $3,288,442.60 94.59 STA141A-051 This will be a chipseal projec 3 R 20201221 RLW/SEMA, A Joint Venture 1 $99,743,586.51 102.34 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 & 4 P ======= ================ ====== TOTALS 448 $725,666,382.56 97.17 Colorado Department of Transportation 15:29 Friday, January 22, 2021 1 2020 Cost Data BRIDGE COST PER SQUARE FOOT (01/01/20 THROUGH 12/31/20) ------------------------------------------------------------------------------------------------------------------------------------ PROJECT NUMBER/ TERR/ TOTAL TOTAL COST PER DATE LET PROJECT LOCATION BRIDGE ID LENGTH WIDTH SQUARE FT COST SQUARE FOOT ------------------------------------------------------------------------------------------------------------------------------------ BRIDGE REPAIR 200123 NH 0503-093 M US50 WEST OF TEXAS CREEK MP 25 0300 63.0000 66.6600 4199.6 $64,349 $15.32 0301 84.3300 34.0000 2867.2 $45,164 $15.75 0302 141.0000 73.5000 10363.5 $72,793 $7.02 200206 NHPP 0852-116 U US85:HAMPDEN TO FLORIDA-RESURF 0300 200.0000 120.0000 24000.0 $1,909,206 $79.55 200213 STA069A-033 M SH69 MP 58.7 TO 71.58 0300 123.3000 25.0000 3082.5 $36,358 $11.79 WEIGHTED AVERAGE COST: NEW STRUCTURES 44512.8 $2,127,869 $47.80 CONCRETE SLAB AND GIRDER 200206 STA059A-036 P SH 59 SEIBERT TO COPE 0300 120.0000 34.0000 4080.0 $530,047 $129.91 200507 FBR0343-042 P US 34 D-27-G STRUCTURE REPLACE 0300 82.5000 48.0000 3960.0 $842,133 $212.66 201112 NHPP0702-384 M I-70 FRISCO TO SILVERTHORNE 0300 69.5000 38.0000 2641.0 $214,826 $81.34 WEIGHTED AVERAGE COST: NEW STRUCTURES 10681.0 $1,587,005 $148.58 CONCRETE SLAB BRIDGE 200227 STR0101-027 P SH 10 Overlay La Junta West 0300 32.0000 41.0000 1312.0 $43,017 $32.79 WEIGHTED AVERAGE COST: NEW STRUCTURES 1312.0 $43,017 $32.79 PRESTRES GIRDER (BOX SECTION) 200116 BR0343-040 P US 34 REPUBLICAN RIVER BRIDGES 0300 115.5000 43.0000 4966.5 $1,026,755 $206.74 200116 FBR0343-043 P US 34 D-28-P STRUCTURE REPLACE 0300 128.5000 43.0000 5525.5 $1,230,872 $222.76 WEIGHTED AVERAGE COST: NEW STRUCTURES 10492.0 $2,257,627 $215.18 Colorado Department of Transportation 15:29 Friday, January 22, 2021 2 2020 Cost Data BRIDGE COST PER SQUARE FOOT (01/01/20 THROUGH 12/31/20) ------------------------------------------------------------------------------------------------------------------------------------ PROJECT NUMBER/ TERR/ TOTAL TOTAL COST PER DATE LET PROJECT LOCATION BRIDGE ID LENGTH WIDTH SQUARE FT COST SQUARE FOOT ------------------------------------------------------------------------------------------------------------------------------------ MAJOR STRUCTURE CBC OR PIPES 200917 NHPP1602-167 M US 160 MP 126.4-128.19 0300 100.0000 100.0000 10000.0 $1,354,947 $135.49 WEIGHTED AVERAGE COST: NEW STRUCTURES 10000.0 $1,354,947 $135.49 TIMBER BRIDGE (GLUELAM) 200827 BR101A-004 R SH 101 (MP 19.35)(MP 19.98) 0300 29.0000 25.0000 725.0 $307,204 $423.73 WEIGHTED AVERAGE COST: NEW STRUCTURES 725.0 $307,204 $423.73 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 1 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 201-00000 Clear and Grub LUMP SUM =============================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 1.00 15000.00 30509.00 20000.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 1.00 7500.00 30000.00 30000.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 1.00 12500.00 55801.76 13596.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 1.00 5000.00 33000.00 15000.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 1.00 10000.00 24614.17 5200.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1.00 26000.00 55750.00 75000.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1.00 320000.00 319725.00 115000.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1.00 5000.00 18160.00 22320.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1.00 9000.00 17463.60 4818.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9.00 45555.56 95841.81 33437.11 IM0761-226 I76/SH52 Interchange 04/02/20 1.00 50000.00 144432.86 29999.99 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 1.00 25000.00 9670.00 18100.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 1.00 60000.00 37500.00 25000.00 SFTY2254-091 225 Ramp Improvements 04/09/20 1.00 20000.00 33000.00 59000.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 37500.00 240540.56 166399.60 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 1.00 10000.00 83700.00 146100.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 1.00 18000.00 22367.50 15100.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 1.00 8000.00 11290.31 870.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1.00 142000.00 159773.52 159773.52 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 1.00 40000.00 36097.25 35000.00 NH050A-037 US 50A Pueblo Regional Pond SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 1.00 21000.00 5248.20 2541.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 11.00 39227.27 80881.36 59807.65 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 1.00 25000.00 21459.01 23754.03 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 1.00 3000.00 6876.00 16000.00 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 1.00 9600.00 7750.00 3500.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 1.00 50000.00 13000.00 3000.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 1.00 10000.00 20000.00 10000.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 1.00 13873.01 13873.01 13873.01 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1.00 5000.00 52857.14 135000.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 1.00 30000.00 76555.55 100000.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 1.00 16798.00 8383.00 2750.00 CR400-374 FY 20 Culvert Prioritization 09/17/20 1.00 6000.00 5532.00 4500.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 2313532.59 100149.69 100149.69 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 11.00 225709.42 34159.75 37502.43 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 2 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 201-00000 Clear and Grub LUMP SUM =============================================== STRM331-008 ADA RAMPS WALSENBURG 10/15/20 1.00 12655.00 13166.67 10000.00 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 1.00 50000.00 41115.00 98725.00 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 1.00 30000.00 33230.00 4690.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 1.00 40000.00 31053.33 20000.00 C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 1.00 20000.00 64260.51 10100.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 1.00 10000.00 13247.00 8000.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 1.00 5000.00 44000.00 48000.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1.00 12915.00 12915.00 12915.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 1.00 50000.00 134773.31 147569.85 CR100-342 US-6 at Garrison 12/17/20 1.00 20000.00 14950.00 15000.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1.00 6595769.18 209316.40 209316.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 11.00 622394.47 50850.84 53119.66 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 42.00 242158.16 66015.11 46563.36 =============== 201-00001 Clear and Grub Acre =================================================== PWQM240-172 El Paso County, north Colorad 01/23/20 4.00 6250.00 21150.00 18300.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 157.00 1000.00 820.85 957.54 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 13.00 8000.00 1602.61 1010.53 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 1.00 10000.00 26161.56 3106.92 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 175.00 1691.43 1524.64 1370.16 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 1.10 5000.00 5000.00 5000.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 22.00 10000.00 3663.68 605.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 23.10 9761.90 3674.73 814.29 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 198.10 2632.51 1968.26 1305.34 =============== 201-00005 Rem of Debris LUMP SUM =============================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 1.00 5000.00 13834.15 23656.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 1.00 15000.00 27500.00 25000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 10000.00 19300.49 24328.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 3 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 201-00005 Rem of Debris LUMP SUM =============================================== CR400-374 FY 20 Culvert Prioritization 09/17/20 1.00 3000.00 5734.50 4500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 3000.00 5734.50 4500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 7666.67 13271.16 17718.67 =============== 201-00007 Rem of Debris Each =================================================== STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 1.00 600.00 270.00 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 600.00 270.00 250.00 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 9.00 5000.00 4030.00 3590.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9.00 5000.00 4030.00 3590.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 4560.00 3770.69 3256.00 =============== 202-00000 Rem Str and Obstructions LUMP SUM =============================================== PWQM240-172 El Paso County, north Colorad 01/23/20 1.00 5000.00 10250.00 7500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 5000.00 10250.00 7500.00 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 1.00 40000.00 11833.33 10000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 40000.00 11833.33 10000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 22500.00 11200.00 8750.00 =============== 202-00001 Rem Structure Each =================================================== NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 2.00 2000.00 2623.57 2623.57 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 2000.00 2623.57 2623.57 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 4 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00001 Rem Structure Each =================================================== C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 4.00 2500.00 2123.39 2566.96 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 2.00 100.00 1587.31 734.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 2.00 1485.07 2602.35 2602.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 1646.27 1962.36 2117.57 CR100-342 US-6 at Garrison 12/17/20 4.00 1500.00 1221.67 1500.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 18.00 1635.83 2295.78 2295.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 22.00 1611.13 1682.00 2151.09 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 32.00 1644.22 1828.35 2172.24 =============== 202-00002 Rem of Structure (Spec) Each =================================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 5000.00 5017.45 950.30 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 5000.00 5017.45 950.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5000.00 5017.45 950.30 =============== 202-00003 Rem of Structure (Spec) LUMP SUM =============================================== NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1.00 39000.00 37614.04 37614.04 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 39000.00 37614.04 37614.04 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 39000.00 37614.04 37614.04 =============== 202-00008 Tree Trimming Hour =================================================== NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 8.00 300.00 90.73 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 300.00 90.73 150.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 5 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00008 Tree Trimming Hour =================================================== FSAC010-124 US 40, US 287, SH 88 08/06/20 8.00 250.00 241.67 225.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 250.00 241.67 225.00 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 8.00 250.00 368.00 212.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 4.00 310.00 260.00 170.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 12.00 270.00 346.40 198.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 28.00 272.86 234.99 192.00 =============== 202-00009 Tree Trimming LUMP SUM =============================================== NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 1.00 3000.00 5975.00 5975.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 3000.00 5975.00 5975.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 3000.00 5975.00 5975.00 =============== 202-00010 Rem Tree Each =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 4.00 300.00 750.00 750.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 9.00 750.00 779.03 1060.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 1.00 500.00 1192.00 150.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 1.00 1000.00 2050.00 2500.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 3.00 250.00 759.50 1000.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1.00 350.00 2122.00 1700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 19.00 555.26 893.25 1046.84 IM0761-226 I76/SH52 Interchange 04/02/20 9.00 500.00 457.00 540.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 71.00 320.00 760.94 445.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 6 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00010 Rem Tree Each =================================================== FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 1.00 800.00 2515.67 537.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 1.00 350.00 833.23 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 82.00 345.98 740.36 465.76 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 2.00 250.00 270.00 250.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 1.00 350.00 1576.67 1000.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 7.00 450.00 844.93 1000.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 3.00 901.79 1345.28 1345.28 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 13.00 515.80 868.60 964.30 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 5.00 300.00 616.67 750.00 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 21.00 400.00 630.60 165.00 C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 8.00 1000.00 509.32 403.00 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 10.00 300.00 257.25 529.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 164.00 398.93 417.94 417.94 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 208.00 415.02 479.86 405.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 322.00 409.78 677.53 481.02 =============== 202-00015 Rem Headwall Each =================================================== NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 1.00 1400.00 750.00 750.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 2.00 1500.00 3027.48 1586.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 1466.67 2571.98 1307.33 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 17.00 2500.00 824.69 401.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 3.00 2000.00 2259.07 2259.07 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20.00 2425.00 855.65 680.14 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1.00 2500.00 2136.29 2000.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 7 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00015 Rem Headwall Each =================================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 5.00 1749.68 2291.45 2291.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 1874.73 2200.94 2242.88 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 28.00 375.00 857.50 478.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 3.00 1965.56 2311.96 2311.96 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 31.00 528.93 883.02 655.48 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 60.00 1342.42 945.57 855.03 =============== 202-00019 Rem Inlet Each =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 2.00 800.00 1300.00 1300.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 4.00 2000.00 1558.33 2000.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 8.00 1000.00 1082.67 1600.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 3.00 1100.00 1777.00 1121.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1.00 1245.00 2008.00 1028.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 18.00 1230.28 1250.48 1543.94 IM0761-226 I76/SH52 Interchange 04/02/20 5.00 1200.00 1121.16 938.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 2.00 1000.00 1379.24 2750.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7.00 1142.86 1202.13 1455.71 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 3.00 1200.00 1700.00 1900.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 3.00 1000.00 1531.43 1500.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 1.00 1000.00 1333.47 1930.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 2.00 874.85 1301.18 1301.18 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9.00 1038.86 1513.23 1636.93 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 3.00 4000.00 1266.67 1500.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 8 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00019 Rem Inlet Each =================================================== NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 1.00 1000.00 1889.00 1378.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1.00 987.00 987.00 987.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 27.00 1031.61 1293.58 1293.58 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 32.00 1307.51 1310.04 1305.99 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 66.00 1232.35 1292.79 1431.89 =============== 202-00020 Rem CBC Each =================================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 9.00 10000.00 6883.54 1782.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 9.00 10000.00 6883.54 1782.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 2.00 40000.00 21318.33 7130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 40000.00 21318.33 7130.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 15454.55 8945.65 2754.36 =============== 202-00021 Rem Manhole Each =================================================== PWQM240-172 El Paso County, north Colorad 01/23/20 1.00 2500.00 1291.50 1283.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1.00 1500.00 1920.00 1500.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 4.00 1200.00 1400.01 1500.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1.00 1200.00 3280.43 740.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7.00 1428.57 1530.87 1360.43 IM0761-226 I76/SH52 Interchange 04/02/20 1.00 1000.00 1209.13 1177.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 1000.00 1209.13 1177.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 1500.00 1605.00 1605.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1500.00 1605.00 1605.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 1388.89 1484.53 1367.22 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 9 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00022 Rem Headgate Each =================================================== NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 4.00 1371.22 986.25 986.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 1371.22 986.25 986.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 1371.22 986.25 986.25 =============== 202-00023 Rem Emb Prot Ty 3 Each =================================================== NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 2.00 1000.00 801.99 801.99 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 1000.00 801.99 801.99 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1000.00 801.99 801.99 =============== 202-00024 Rem Emb Prot Ty 5 Each =================================================== IM0761-226 I76/SH52 Interchange 04/02/20 4.00 500.00 521.32 489.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 500.00 521.32 489.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 4.00 500.00 922.41 595.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 500.00 922.41 595.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 500.00 706.44 542.00 =============== 202-00025 Rem Ditch Lining Lin Foot =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 544.00 7.62 11.62 11.62 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 544.00 7.62 11.62 11.62 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 4,882.00 9.87 7.76 7.76 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,882.00 9.87 7.76 7.76 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,426.00 9.64 8.15 8.15 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 10 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00026 Rem S and D Pave Sq Yard ================================================ FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 402.00 25.00 27.42 25.00 STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 45.50 40.00 130.00 130.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 109.00 18.50 16.63 36.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 556.50 24.95 25.18 35.74 SFTY2254-091 225 Ramp Improvements 04/09/20 2,141.00 40.00 25.50 33.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,141.00 40.00 25.50 33.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 586.00 10.49 22.17 22.17 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 586.00 10.49 22.17 22.17 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 431.00 19.17 19.17 19.17 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 2,214.00 12.79 14.16 14.16 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,645.00 13.83 14.98 14.98 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,928.50 23.99 22.34 24.15 =============== 202-00027 Rem Riprap Sq Yard ================================================ FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 43.00 20.00 32.00 32.00 PWQM240-172 El Paso County, north Colorad 01/23/20 121.00 25.00 40.50 59.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 3.00 250.00 727.70 1818.10 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 12.00 100.00 74.67 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 179.00 32.60 61.86 87.43 SFTY2254-091 225 Ramp Improvements 04/09/20 26.00 75.00 57.50 89.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 26.00 75.00 57.50 89.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 11 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00027 Rem Riprap Sq Yard ================================================ NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 309.00 45.00 26.20 13.76 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 309.00 45.00 26.20 13.76 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 3,572.00 18.54 22.79 22.79 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,572.00 18.54 22.79 22.79 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,086.00 21.52 26.41 25.36 =============== 202-00029 Rem Gabion Cubic Yard ============================================= STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 78.00 50.00 68.00 61.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 78.00 50.00 68.00 61.00 C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 100.00 80.00 376.21 154.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 100.00 80.00 376.21 154.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 178.00 66.85 302.92 113.25 =============== 202-00030 Rem Water Service Each =================================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 2000.00 2207.42 3217.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1.00 7000.00 2136.54 2136.54 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 4500.00 2199.55 2677.02 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 3145.28 1513.75 1513.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 3145.28 1513.75 1513.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 4048.43 2130.97 2289.26 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 12 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00031 Rem of Fire Hydrant Each =================================================== IM0761-226 I76/SH52 Interchange 04/02/20 1.00 2000.00 1436.01 1611.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 2000.00 1436.01 1611.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2000.00 1436.01 1611.00 =============== 202-00032 Rem Valve Each =================================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 959.04 975.19 975.19 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 959.04 975.19 975.19 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 959.04 975.19 975.19 =============== 202-00033 Rem Pipe Each =================================================== NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 2.00 2000.00 1500.00 1500.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 9.00 2000.00 3236.67 7000.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 11.00 2500.00 4249.25 2300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 22.00 2250.00 3968.58 4150.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 22.00 2250.00 3968.58 4150.00 =============== 202-00035 Rem Pipe Lin Foot =============================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 420.00 20.00 21.00 21.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 620.00 20.00 22.41 13.00 PWQM240-172 El Paso County, north Colorad 01/23/20 377.00 35.00 29.50 27.00 STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 42.00 50.00 120.00 120.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 76.00 30.00 82.83 48.48 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 20.00 30.00 122.17 190.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1,014.00 22.00 40.45 56.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 375.00 30.00 83.70 17.60 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 61.00 35.00 55.00 42.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,005.00 24.85 40.83 35.12 IM0761-226 I76/SH52 Interchange 04/02/20 776.00 28.00 25.58 18.99 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 13 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00035 Rem Pipe Lin Foot =============================================== STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 134.00 25.00 27.13 37.00 SFTY2254-091 225 Ramp Improvements 04/09/20 3.00 50.00 297.50 295.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 656.00 25.00 42.95 13.20 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 2,953.00 30.48 33.48 33.48 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4,522.00 29.11 33.90 28.33 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 50.00 51.00 44.00 70.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 91.00 53.47 53.47 53.47 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 291.00 35.00 36.00 35.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 938.00 10.00 28.34 34.50 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 321.00 30.00 25.78 7.35 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1,112.00 28.96 35.47 35.47 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,803.00 24.55 30.33 33.08 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 34.00 22.00 66.50 83.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 6.00 96.60 96.60 96.60 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 1,339.00 30.00 33.35 38.40 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 8,237.00 25.10 29.62 29.62 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9,616.00 25.82 31.63 31.07 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19,946.00 26.24 34.08 31.34 =============== 202-00036 Rem of Pipe (Spec) Lin Foot =============================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 183.00 5.00 19.83 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 183.00 5.00 19.83 35.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1,133.00 44.61 52.70 52.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,133.00 44.61 52.70 52.70 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 945.00 49.36 52.81 52.81 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 945.00 49.36 52.81 52.81 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,261.00 43.39 45.87 51.32 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 14 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00037 Rem of End Section Each =================================================== STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 1.00 650.00 2200.00 2200.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 1.00 300.00 405.77 480.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 7.00 200.00 493.33 580.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 20.00 280.00 317.50 550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 29.00 274.14 348.76 611.72 IM0761-226 I76/SH52 Interchange 04/02/20 15.00 300.00 347.32 231.01 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 14.00 590.00 359.36 198.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 4.00 568.00 878.16 878.16 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 33.00 455.52 363.03 295.45 STM094A-038 SH94 WB PASSING LANE 09/01/20 2.00 326.83 326.83 326.83 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 3.00 500.00 440.71 200.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 11.00 730.30 899.31 899.31 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 16.00 636.69 582.38 696.63 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 4.00 264.60 264.60 264.60 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 53.00 654.75 476.67 476.67 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 57.00 627.37 461.79 461.79 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 135.00 510.59 384.12 481.17 =============== 202-00039 Rem of Bollard Each =================================================== STRR300-249 Grand and Jackson Counties AD 03/05/20 1.00 700.00 776.67 180.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 2.00 100.00 441.67 270.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 300.00 553.33 240.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 1.00 300.00 1095.00 1800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 300.00 1095.00 1800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 300.00 688.75 630.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 15 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00047 Rem Elec Equipment LUMP SUM =============================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 1.00 5750.00 12600.00 1500.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 1.00 5000.00 6204.75 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 5375.00 8945.57 2000.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 2000.00 5638.05 5500.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 2000.00 5638.05 5500.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 1.00 125000.00 98500.00 75000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 125000.00 98500.00 75000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 34437.50 17924.91 21125.00 =============== 202-00055 Rem of FO Cable Lin Foot =============================================== IM0761-226 I76/SH52 Interchange 04/02/20 5,450.00 1.00 2.10 1.29 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,450.00 1.00 2.10 1.29 STM094A-038 SH94 WB PASSING LANE 09/01/20 2,450.00 2.42 2.42 2.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,450.00 2.42 2.42 2.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,900.00 1.44 2.12 1.64 =============== 202-00060 Rem Trav Time Indicator Each =================================================== ITSITSB-002 ITS CV ROADSIDE UNITS 11/12/20 75.00 1000.00 230.33 111.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 75.00 1000.00 230.33 111.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 75.00 1000.00 230.33 111.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 16 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00070 Rem Barricade Each =================================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 2.00 900.00 691.95 605.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 900.00 691.95 605.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 900.00 691.95 605.00 =============== 202-00090 Rem Delineator Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 100.00 6.00 5.23 5.50 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 21.00 10.00 27.62 8.60 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 100.00 15.00 5.25 5.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 300.00 10.00 3.58 3.15 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 5.00 5.00 15.78 13.25 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 176.00 10.00 5.50 5.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 650.00 7.00 8.89 9.90 FSA2873-194 US 287 Longmont Intersection 02/13/20 6.00 10.00 29.50 22.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 396.00 8.00 4.59 6.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 450.00 7.00 6.22 5.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 272.00 9.50 5.36 5.70 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 861.00 4.00 6.79 6.06 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 565.00 10.00 8.00 8.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 44.00 10.00 8.43 10.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 9.00 8.77 35.88 17.19 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 150.00 10.00 8.10 12.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 200.00 7.00 6.05 2.25 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 15.00 28.00 34.00 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,320.00 7.76 7.20 6.71 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 586.00 7.50 4.88 7.58 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 550.00 7.00 7.45 9.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 17.00 10.00 5.25 5.00 SFTY2254-091 225 Ramp Improvements 04/09/20 26.00 10.00 31.50 31.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 160.00 25.00 7.12 4.40 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 20.00 20.00 23.33 27.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 24.00 20.00 34.19 30.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 18.00 15.00 67.00 60.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 90.00 16.00 16.21 16.21 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 17 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00090 Rem Delineator Each =================================================== SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 12.00 10.00 29.02 22.58 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,503.00 10.24 9.07 10.02 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 9.00 10.00 52.50 65.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 9.00 9.40 20.99 30.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 11.00 5.35 5.35 5.35 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 14.00 35.00 78.14 15.72 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 151.00 10.00 7.57 5.85 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 99.00 20.00 9.73 7.35 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 4.00 60.00 70.83 20.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 11.00 20.00 27.16 27.16 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 308.00 15.17 12.68 10.14 MPC040-061 R2 FY 21 Sign Replacement 10/01/20 1.00 23.34 7.50 5.00 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 200.00 15.00 15.55 14.64 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 463.00 15.00 17.87 20.10 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 130.00 15.00 8.67 12.40 CR100-342 US-6 at Garrison 12/17/20 12.00 15.00 113.25 5.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 600.00 16.15 17.28 17.28 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,406.00 15.50 17.26 17.27 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,537.00 10.00 9.63 9.48 =============== 202-00120 Rem CBC Lin Foot =============================================== NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 60.00 50.00 176.50 63.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 338.00 78.16 109.75 109.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 398.00 73.91 127.24 102.70 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 398.00 73.91 127.24 102.70 =============== 202-00150 Rem Wall Each =================================================== STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 1.00 8000.00 2950.00 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 8000.00 2950.00 2000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 8000.00 2950.00 2000.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 18 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00155 Rem Wall Lin Foot =============================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 25.00 200.00 16.00 16.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 56.00 60.00 97.54 100.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC PWQM240-172 El Paso County, north Colorad 01/23/20 81.00 50.00 110.50 190.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 20.00 100.00 69.58 140.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 157.00 200.00 100.20 104.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 339.00 135.13 97.89 119.52 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 59.00 50.00 125.00 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 59.00 50.00 125.00 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 398.00 122.51 100.04 109.22 =============== 202-00160 Rem Wall Sq Foot ================================================ C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 66.00 60.00 71.50 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 66.00 60.00 71.50 25.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 66.00 60.00 71.50 25.00 =============== 202-00170 Grinding And Texturing Conc Pvmt Sq Yard ================================================ NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 85.00 42.00 167.33 258.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 72,316.00 9.00 5.50 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 72,401.00 9.04 5.78 5.30 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 119.00 100.00 29.03 26.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 119.00 100.00 29.03 26.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 72,520.00 9.19 5.84 5.33 =============== 202-00190 Rem of Conc Median Cover Matl Sq Yard ================================================ FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 55.00 21.00 22.00 22.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 19 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00190 Rem of Conc Median Cover Matl Sq Yard ================================================ NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 44.50 24.00 41.23 47.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 88.00 30.00 25.12 34.20 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1,519.00 20.00 9.75 14.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 723.00 14.00 19.23 14.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,429.50 18.67 11.36 15.79 IM0761-226 I76/SH52 Interchange 04/02/20 327.00 20.00 9.79 2.01 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 34.00 22.00 348.18 40.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 50.00 22.00 31.53 40.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 46.00 25.00 78.00 108.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 12.00 40.00 66.33 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 469.00 21.36 46.79 20.31 STMM086-083 ADA PUEBLO METRO 07/09/20 306.00 15.00 27.50 25.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 437.00 35.00 28.00 35.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 59.00 25.00 22.93 11.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 4,147.00 7.00 10.01 4.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,949.00 10.18 11.20 8.66 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 50.00 20.00 60.00 45.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 200.00 25.00 40.00 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 250.00 24.00 45.45 41.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,097.50 13.80 13.99 12.47 =============== 202-00195 Rem of Median Cover Sq Yard ================================================ NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 48.00 60.00 67.33 55.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1,540.00 10.00 9.48 15.10 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 65.00 25.00 34.00 56.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,653.00 12.04 12.69 17.87 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 20 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00195 Rem of Median Cover Sq Yard ================================================ FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 83.00 25.00 45.00 16.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 24.00 60.00 67.17 58.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 108.00 50.00 35.76 20.79 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 215.00 41.47 41.06 23.09 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 5.00 56.00 61.25 57.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 106.00 18.00 40.00 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 111.00 19.71 41.83 40.77 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,979.00 15.67 17.73 19.72 =============== 202-00200 Rem Sidewalk Sq Yard ================================================ FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 161.00 26.00 22.00 22.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 758.50 23.00 27.40 28.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 520.00 23.00 18.57 20.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 21.40 60.00 80.00 30.00 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 2.00 100.00 227.00 75.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 31.00 30.00 44.60 101.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 42.00 30.00 41.99 24.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 202.00 25.00 39.00 47.00 STRR300-249 Grand and Jackson Counties AD 03/05/20 1,228.00 40.00 53.00 39.00 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 443.00 40.00 41.17 23.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 490.00 40.00 10.00 10.50 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 301.00 32.00 12.94 22.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 457.00 19.00 23.10 15.20 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 222.00 35.00 26.60 17.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,878.90 31.74 29.67 26.68 IM0761-226 I76/SH52 Interchange 04/02/20 278.00 40.00 12.74 5.50 C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 110.00 18.00 32.20 43.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 663.00 35.00 61.00 55.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 21 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00200 Rem Sidewalk Sq Yard ================================================ NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 124.00 35.00 45.33 41.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 10.00 100.00 138.25 183.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 25.00 22.00 45.27 100.00 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 2.00 25.00 576.70 250.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 77.00 50.00 49.00 47.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 13.00 50.00 41.35 20.77 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,302.00 35.90 40.00 43.42 STMM086-083 ADA PUEBLO METRO 07/09/20 2,297.00 15.00 25.00 20.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 157.00 30.00 35.00 35.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 139.00 30.00 42.73 38.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 1,306.00 40.00 26.00 29.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 3,636.00 28.00 31.17 40.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 1,502.00 32.00 32.22 41.11 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 229.00 25.00 20.11 13.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 147.00 30.00 18.25 11.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 250.00 50.00 26.14 32.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9,663.00 27.74 29.55 32.54 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 1,726.00 30.00 23.00 19.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 93.00 40.00 83.33 85.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 31.00 50.00 48.50 40.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 287.00 32.00 34.50 37.00 CR100-342 US-6 at Garrison 12/17/20 2,404.00 25.00 30.50 26.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,541.00 27.82 29.55 25.34 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20,384.90 29.24 30.20 30.23 =============== 202-00201 Rem Curb Lin Foot =============================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 206.00 7.00 7.00 7.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 925.00 8.00 7.26 11.50 STRR300-249 Grand and Jackson Counties AD 03/05/20 106.00 25.00 45.33 15.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 946.00 15.00 6.10 7.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,183.00 11.76 9.16 9.45 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 220.00 11.00 8.78 11.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 22 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00201 Rem Curb Lin Foot =============================================== NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 88.00 10.00 20.00 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 308.00 10.71 11.99 11.57 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 109.00 15.00 12.61 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 109.00 15.00 12.61 14.00 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 58.00 20.00 18.33 15.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 4,254.00 10.00 10.79 14.25 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 242.00 9.00 12.50 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,554.00 10.07 10.95 14.19 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,154.00 10.69 10.60 12.63 =============== 202-00202 Rem Gutter Lin Foot =============================================== STRR300-249 Grand and Jackson Counties AD 03/05/20 21.00 20.00 61.00 31.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 688.00 10.00 6.52 9.25 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 54.00 16.00 20.73 5.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 763.00 10.70 8.74 9.61 IM0761-226 I76/SH52 Interchange 04/02/20 134.00 15.00 9.61 10.50 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 113.00 30.00 53.00 44.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 247.00 21.86 21.13 25.83 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 522.00 20.00 22.33 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 522.00 20.00 22.33 15.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,532.00 15.67 16.05 14.06 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 23 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00203 Rem Curb and Gutter Lin Foot =============================================== NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 355.00 30.00 19.67 14.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 271.00 9.00 9.00 9.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 2,062.00 17.00 11.60 12.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 538.00 15.00 12.22 9.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 63.90 20.00 20.00 10.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 141.00 20.00 18.16 10.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 159.00 20.00 21.00 15.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 901.00 11.00 9.89 12.00 STRR300-249 Grand and Jackson Counties AD 03/05/20 2,512.00 20.00 23.67 15.00 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 843.00 35.00 20.77 15.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 6,287.00 10.00 5.35 7.25 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 3,930.00 9.00 5.88 6.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 3,126.00 8.00 5.65 6.50 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 743.00 17.00 16.50 10.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 21,931.90 13.18 9.50 9.11 IM0761-226 I76/SH52 Interchange 04/02/20 2,737.00 10.00 4.53 1.70 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 145.00 15.00 11.70 14.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 651.00 10.00 12.37 15.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 828.00 15.00 50.33 44.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 163.00 20.00 23.00 7.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 200.00 14.00 21.83 15.50 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 100.00 15.00 49.17 30.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 569.00 5.00 7.52 7.52 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 35.00 40.00 31.33 21.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 272.00 15.00 14.71 11.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,700.00 11.29 11.22 11.98 STMM086-083 ADA PUEBLO METRO 07/09/20 3,627.00 10.00 17.50 15.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 2,204.00 15.00 13.50 17.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 156.00 16.00 15.77 15.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 2,133.00 20.00 15.33 18.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 5,026.00 14.00 18.33 23.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 3,785.00 12.00 17.18 17.91 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1,044.00 15.00 10.12 10.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 9,461.00 10.00 4.17 2.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 24 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00203 Rem Curb and Gutter Lin Foot =============================================== STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 560.00 34.00 14.21 15.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 27,996.00 12.84 11.28 12.64 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 2,284.00 20.00 18.33 15.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 421.00 20.00 23.00 27.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 8.00 10.50 26.88 23.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 693.00 16.00 13.00 14.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 42.00 13.65 13.65 13.65 CR100-342 US-6 at Garrison 12/17/20 1,505.00 10.00 14.50 14.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 3,488.00 9.87 6.91 6.91 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8,441.00 13.66 14.90 12.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 64,068.90 12.93 11.00 11.29 =============== 202-00205 Rem Wheel Stop Each =================================================== FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 1.00 150.00 760.00 92.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 150.00 760.00 92.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 150.00 760.00 92.00 =============== 202-00206 Rem Conc Curb Ramp Sq Yard ================================================ NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 216.00 50.00 58.67 33.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 94.00 45.00 32.00 32.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 814.00 41.00 35.00 29.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 91.00 45.00 34.32 25.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 78.00 40.00 28.00 16.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 28.00 40.00 57.48 28.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 50.00 48.00 29.83 34.95 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 76.00 40.00 35.17 58.50 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 85.00 40.00 34.00 26.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,532.00 42.81 38.34 30.32 IM0761-226 I76/SH52 Interchange 04/02/20 43.00 50.00 27.57 15.99 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 25 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00206 Rem Conc Curb Ramp Sq Yard ================================================ C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 102.00 24.00 35.20 40.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 440.00 50.00 56.67 42.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 83.00 40.00 42.00 41.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 51.00 50.00 49.50 44.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 111.00 35.00 41.96 20.79 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 830.00 43.80 46.88 37.59 STMM086-083 ADA PUEBLO METRO 07/09/20 2,817.00 25.00 30.00 20.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 155.00 50.00 56.00 70.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 98.00 40.00 47.17 42.50 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 60.00 40.00 32.79 30.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 44.00 40.00 33.05 16.20 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 167.00 50.00 30.57 45.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,341.00 28.32 32.07 24.38 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 92.00 50.00 100.00 95.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 130.00 45.00 46.75 40.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 221.00 40.00 36.00 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 443.00 43.54 54.78 51.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,146.00 35.12 38.24 29.60 =============== 202-00207 Rem of Brick Pavers Sq Yard ================================================ STRR300-249 Grand and Jackson Counties AD 03/05/20 659.00 35.00 14.67 17.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 47.00 50.00 53.67 28.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 706.00 36.00 17.26 17.73 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 3.00 50.00 91.40 29.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 50.00 91.40 29.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 78.00 40.00 21.38 16.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 78.00 40.00 21.38 16.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 787.00 36.45 18.43 17.66 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 26 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00210 Rem Conc Pavement Sq Yard ================================================ FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 100.00 40.00 99.33 85.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 599.00 17.50 30.17 32.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 59.00 40.00 93.93 55.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 6,227.00 40.00 55.00 55.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 737.00 40.00 30.60 30.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 1,285.00 22.00 27.47 22.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 38.00 60.00 75.00 105.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 7,708.00 12.00 9.58 10.31 STRR300-249 Grand and Jackson Counties AD 03/05/20 389.00 40.00 68.33 41.00 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 53.00 35.00 38.26 27.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 52.00 30.00 43.46 80.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 2,316.00 20.00 24.25 34.40 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 339.00 40.00 64.00 32.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 19,902.00 24.99 32.19 31.12 IM0761-226 I76/SH52 Interchange 04/02/20 12,213.00 18.00 11.26 9.20 SFTY2254-091 225 Ramp Improvements 04/09/20 1,184.00 35.00 49.00 46.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 27,207.00 12.00 6.80 4.61 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1601-082 Hawkins Signal and Curb Ramps 04/30/20 417.00 40.00 68.67 45.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 24.00 100.00 69.67 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 41,045.00 14.78 8.64 7.61 STMM086-083 ADA PUEBLO METRO 07/09/20 1,265.00 25.00 38.50 25.00 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 1,134.00 20.00 16.17 12.85 FSAC010-124 US 40, US 287, SH 88 08/06/20 45.00 40.00 43.00 45.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 441.00 60.00 85.57 80.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 64.00 35.00 28.33 22.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 81.00 35.00 52.00 50.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 273.00 40.00 39.31 47.55 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 808.00 35.00 34.30 25.00 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 35.00 35.00 791.00 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,146.00 30.89 45.39 30.14 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 430.00 40.00 32.00 20.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 27 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00210 Rem Conc Pavement Sq Yard ================================================ NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 139.00 45.00 51.00 42.00 CR100-342 US-6 at Garrison 12/17/20 175.00 20.00 38.50 28.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 12,051.00 9.32 9.60 9.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 12,795.00 10.88 14.42 10.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 77,888.00 17.61 13.68 15.30 =============== 202-00212 Rem Conc Pavement (Spec) Sq Yard ================================================ STR2871-038 US 287 Passing Lanes Springfi 03/05/20 7,389.00 15.00 16.39 17.29 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7,389.00 15.00 16.39 17.29 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1,241.00 19.59 21.45 21.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,241.00 19.59 21.45 21.45 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 1,212.00 75.00 40.33 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,212.00 75.00 40.33 20.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,842.00 22.97 21.14 18.15 =============== 202-00215 Rem Conc Pvmt (Planing) Sq Yard ================================================ NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 450.00 28.00 19.43 21.38 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 450.00 28.00 19.43 21.38 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 119.00 12.00 37.90 51.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 119.00 12.00 37.90 51.70 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 569.00 24.65 23.29 27.72 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 28 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00217 Rem Conc Pvmt (Planing) (Spec) Sq Yard ================================================ BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 1,202.00 39.27 51.29 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,202.00 39.27 51.29 25.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,202.00 39.27 51.29 25.00 =============== 202-00220 Rem Asphalt Mat Sq Yard ================================================ FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 950.00 12.00 25.44 15.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 3,027.00 10.00 8.00 8.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 10,697.00 5.00 16.83 5.50 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 5,774.00 7.00 6.30 4.75 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STA006A-067 SH 6 Merino to Atwood 01/16/20 1,000.00 8.00 4.30 3.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 3,474.00 10.00 9.00 10.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 2,219.00 6.00 36.00 35.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 1,043.00 8.00 22.86 11.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 2,427.00 8.00 9.06 9.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 213.00 25.00 34.00 37.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 244.00 25.00 59.00 59.00 STRR300-249 Grand and Jackson Counties AD 03/05/20 757.00 50.00 46.00 20.00 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 28.00 50.00 27.03 8.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 3,226.00 4.00 11.75 17.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1,482.00 7.00 27.03 26.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 3,568.00 7.00 14.30 14.90 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 741.00 12.00 40.50 21.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 40,870.00 8.01 15.32 11.59 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 3,733.00 8.00 6.43 3.25 IM0761-226 I76/SH52 Interchange 04/02/20 22,279.00 7.00 5.33 3.70 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 210.00 10.00 21.62 21.00 SFTY2254-091 225 Ramp Improvements 04/09/20 669.00 25.00 25.50 19.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 51,570.00 8.00 4.73 7.19 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1601-082 Hawkins Signal and Curb Ramps 04/30/20 48.00 30.00 128.67 310.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 10,648.00 6.00 18.17 14.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 9,048.00 7.00 5.40 5.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 125.00 50.00 48.00 55.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 2,267.00 6.50 7.02 8.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 170.00 9.00 20.27 25.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 29 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00220 Rem Asphalt Mat Sq Yard ================================================ NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 15,851.00 3.70 3.23 3.23 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 27.00 65.00 51.50 60.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 233.00 25.00 42.64 31.19 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 116,878.00 7.14 5.75 6.68 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 618.00 8.00 21.13 22.00 STMM086-083 ADA PUEBLO METRO 07/09/20 1,558.00 13.00 50.50 25.00 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 36.00 44.00 31.33 57.00 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 42.00 20.00 73.00 36.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 1,047.00 30.00 35.00 35.00 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 5,555.00 6.00 11.48 3.90 FSAC010-124 US 40, US 287, SH 88 08/06/20 93.00 35.00 56.67 54.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 125.00 50.00 33.67 6.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 2,562.00 14.53 10.53 6.90 STM094A-038 SH94 WB PASSING LANE 09/01/20 5,005.00 10.34 10.34 10.34 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 1,117.00 35.00 35.33 30.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 798.00 25.00 32.02 30.12 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 3,736.00 13.00 8.55 10.00 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 250.00 25.00 45.75 35.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 19,665.00 20.00 6.40 2.60 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 258.00 30.00 52.05 52.70 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 140.00 55.00 27.82 20.69 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 8,708.00 6.43 7.54 7.54 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 51,313.00 15.00 10.83 8.31 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 1,090.00 15.00 23.00 15.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 2,527.00 18.00 24.58 25.75 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 29.00 21.50 48.25 60.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 652.00 25.00 29.00 34.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 6,583.00 8.19 8.19 8.19 CR100-342 US-6 at Garrison 12/17/20 200.00 20.00 28.83 22.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 163,412.00 9.42 10.35 10.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 174,493.00 9.61 11.36 10.63 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 383,554.00 9.40 8.54 9.22 =============== 202-00222 Removal of Detour Pavement Sq Yard ================================================ NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 56,410.00 4.96 5.21 5.21 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 56,410.00 4.96 5.21 5.21 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 56,410.00 4.96 5.21 5.21 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 30 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00226 Rem of Asph Mat (Special) Sq Yard ================================================ STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 3,464.00 10.00 9.99 6.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,464.00 10.00 9.99 6.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,464.00 10.00 9.99 6.30 =============== 202-00240 Rem Asphalt Mat (Planing) Sq Yard ================================================ STA0142-066 SH 14 New Raymer West 01/09/20 177,200.00 1.60 1.26 0.75 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 1,650.00 7.00 4.50 4.50 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 480,255.00 1.75 2.72 2.00 STA006A-067 SH 6 Merino to Atwood 01/16/20 136,413.00 2.25 1.25 0.60 STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 847.00 15.00 14.25 18.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 246,781.00 2.00 2.02 1.54 STR141A-044 SH 141 AND SH 145, FROM SLICK 01/30/20 108,716.00 2.50 2.21 1.40 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 91,710.00 3.75 7.93 6.91 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 2,609.00 5.00 6.82 6.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 5,437.00 3.00 6.13 5.25 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 15,500.00 10.00 3.53 5.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 13,561.00 2.50 3.89 4.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 14,831.00 10.00 3.42 4.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 235,201.00 1.85 2.95 1.85 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 2,051.00 5.00 6.75 7.80 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 6,694.00 15.00 6.40 4.65 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 951.00 31165.00 6.50 6.50 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 929.00 5.00 6.98 5.93 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 11,974.00 2.00 3.55 3.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 110,832.00 2.25 5.11 4.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,664,142.00 20.07 3.00 2.16 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 3,001.00 10.00 8.81 9.11 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 6,717.00 5.00 4.95 4.00 IM0761-226 I76/SH52 Interchange 04/02/20 1,181.00 7.00 8.83 7.71 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 537.00 8.00 12.37 9.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 2,377.00 2.50 19.93 23.80 C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 1,551.00 3.00 7.34 5.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 255.00 7.00 24.33 6.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 7,543.00 3.00 3.42 3.10 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 5,687.00 4.50 4.33 3.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 28,849.00 4.74 5.73 6.19 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 31 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00240 Rem Asphalt Mat (Planing) Sq Yard ================================================ SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 1,174.00 10.00 7.50 5.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 1,584.00 7.49 5.57 5.20 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 7,793.00 2.50 3.26 1.50 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 81,999.00 5.00 2.04 1.30 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 4,410.00 5.00 4.86 11.25 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 528.00 8.39 7.99 7.99 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 97,488.00 4.92 2.40 1.91 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 7,352.00 20.00 33.00 39.01 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 381,038.00 2.00 2.70 1.60 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 165,114.00 3.00 4.15 2.95 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 133,000.00 3.00 5.56 3.90 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 17,206.00 5.00 4.84 6.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 5,139.00 4.00 3.33 1.20 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 110,251.00 2.55 2.75 2.77 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 149,670.00 4.00 2.63 1.95 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 2,666.00 5.78 5.78 5.78 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 1,407.00 10.00 6.46 5.15 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 125,676.00 1.33 1.27 1.27 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,098,519.00 2.72 3.53 2.54 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,888,998.00 12.81 3.19 2.34 =============== 202-00246 Rem Asphalt Mat (Planing)(Special) Sq Yard ================================================ NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 13,504.00 6.00 11.12 8.50 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 1,898.00 2.25 16.93 11.86 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 7,815.00 10.00 12.00 15.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 2,318.00 6.00 20.25 16.50 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 282.00 20.00 28.08 24.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 136.00 30.00 65.21 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 25,953.00 7.21 12.80 11.86 IM0761-226 I76/SH52 Interchange 04/02/20 1,287.00 10.00 16.39 9.01 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,287.00 10.00 16.39 9.01 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 32 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00246 Rem Asphalt Mat (Planing)(Special) Sq Yard ================================================ MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 6,336.00 7.00 3.76 1.70 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 4,126.00 10.00 16.62 2.35 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 750.00 10.00 31.65 18.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 411.00 7.00 27.82 8.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 11,623.00 8.26 11.78 3.21 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 12,563.00 15.00 10.67 6.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 12,563.00 15.00 10.67 6.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 51,426.00 9.42 12.15 8.61 =============== 202-00248 Rem Rumble Strips Lin Foot =============================================== C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 7,150.00 4.00 2.94 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7,150.00 4.00 2.94 3.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 3,240.00 5.49 7.01 7.01 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,240.00 5.49 7.01 7.01 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10,390.00 4.46 3.16 4.25 =============== 202-00250 Rem Pavement Marking Sq Foot ================================================ FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 8,837.00 1.00 1.81 1.60 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 716.00 5.00 5.58 6.25 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 455.00 3.00 4.00 4.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 72,250.00 0.90 0.82 0.90 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 1,400.00 2.00 3.36 3.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 41,460.00 1.00 0.73 0.65 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 33 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00250 Rem Pavement Marking Sq Foot ================================================ NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 20,000.00 1.00 1.50 2.00 MTCER300-257 R3 FY 20/21 Region Wide Epoxy 02/06/20 1,438,746.00 0.52 0.53 0.30 FSA2873-194 US 287 Longmont Intersection 02/13/20 1,648.00 2.00 3.51 3.10 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 1,700.00 4.00 2.25 2.50 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 92,491.00 0.85 0.65 0.70 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 2,750.00 7.00 3.20 3.20 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 23,162.00 2.00 1.32 1.23 NHPP0502-082 US 50 MONTROSE RE CHIP SEAL 03/05/20 269,231.00 0.80 0.65 0.60 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 350.00 4.50 5.82 5.69 STRR300-249 Grand and Jackson Counties AD 03/05/20 1,116.00 3.50 9.33 3.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 27,458.00 2.00 2.42 2.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 57,618.00 0.75 0.88 0.90 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 14,458.00 0.66 3.23 3.40 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 4,500.00 1.00 3.03 3.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,080,346.00 0.66 0.70 0.50 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 124,203.00 0.75 0.73 0.75 IM0761-226 I76/SH52 Interchange 04/02/20 32,300.00 1.00 1.25 1.06 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 17.00 1.00 3.63 4.00 MTCER300-259 MTCE R3 FY20/21 Region Wide S 04/02/20 1,500.00 2.00 2.75 2.75 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 120,754.00 1.00 0.99 0.75 SFTY2254-091 225 Ramp Improvements 04/09/20 5,550.00 3.00 2.50 3.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 20,000.00 0.70 1.35 1.10 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 3,000.00 1.00 2.53 2.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 444.00 5.00 6.25 4.25 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 3,900.00 2.50 2.53 2.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 23,986.00 1.20 1.18 0.80 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 4,165.00 2.80 2.27 2.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 862.00 3.25 6.89 6.25 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 67,537.00 0.70 0.83 0.80 MTCE R100-341 Various Highways in Region 1 05/21/20 4,536,595.00 0.43 0.49 0.33 MTCER200-265 Pueblo 05/28/20 1,489,089.00 0.55 0.45 0.28 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 10,467.00 3.00 2.66 2.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6,444,369.00 0.49 0.54 0.36 MTCER400-381 REGION 4 FY21 EPOXY 07/02/20 2,621,293.00 0.55 0.49 0.45 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 621.00 3.00 5.88 3.00 STMM086-083 ADA PUEBLO METRO 07/09/20 320.00 1.00 16.50 15.00 MTCER300-258 MTCE R3 FY20 Region Roundabou 07/09/20 25,000.00 3.30 3.75 3.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 34 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00250 Rem Pavement Marking Sq Foot ================================================ SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 4,510.00 1.00 2.75 3.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 854.00 1.00 5.00 6.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 20.00 4.00 4.40 4.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 2,489.00 2.10 3.49 4.30 STM094A-038 SH94 WB PASSING LANE 09/01/20 30,185.00 0.93 0.93 0.93 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 1,673.00 7.00 3.33 2.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 106.00 5.00 11.15 5.27 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 88.00 1.00 6.86 5.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 28,840.00 2.00 1.06 1.75 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 4,700.00 1.00 3.27 3.15 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 480.00 8.00 3.53 2.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,721,179.00 0.60 0.54 0.52 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 110,382.00 1.00 0.73 0.55 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 104,555.00 0.80 0.72 0.60 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 27,473.00 1.00 0.79 0.79 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 139,579.00 0.70 0.57 0.60 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 29,952.00 2.00 0.73 0.64 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 4,993.00 2.00 2.75 2.50 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 7,370.00 3.32 3.32 3.32 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 50,100.00 1.25 0.61 0.80 CR100-342 US-6 at Garrison 12/17/20 1,811.00 4.50 5.38 1.50 STA141A-051 This will be a chipseal proje 12/17/20 399,967.00 0.65 0.62 0.50 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 72,130.00 1.09 1.26 1.26 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 948,312.00 0.87 0.67 0.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12,194,206.00 0.58 0.57 0.44 =============== 202-00251 Rem Pvmt Marking (Asph Grooving) Sq Foot ================================================ NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 121,350.00 0.45 0.69 0.67 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 57,463.00 0.75 0.68 0.65 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 250.00 0.50 6.31 7.77 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 179,063.00 0.55 0.71 0.67 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 1,290.00 1.50 5.37 4.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 8,172.00 1.39 1.39 1.39 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9,462.00 1.40 3.48 1.75 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 35 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00251 Rem Pvmt Marking (Asph Grooving) Sq Foot ================================================ IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 25,795.00 0.60 0.90 0.86 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 25,795.00 0.60 0.90 0.86 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 214,320.00 0.59 0.83 0.74 =============== 202-00254 Rem of Pvmt Mkg (12 In) Sq Foot ================================================ NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 2,000.00 1.25 1.50 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,000.00 1.25 1.50 2.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 5,000.00 1.00 1.35 1.10 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,000.00 1.00 1.35 1.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,000.00 1.07 1.36 1.36 =============== 202-00256 Rem of Pvmt Mkg (15 In) Sq Foot ================================================ NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 1,000.00 1.25 1.50 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,000.00 1.25 1.50 2.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 2,500.00 1.25 1.35 1.10 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,500.00 1.25 1.35 1.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,500.00 1.25 1.36 1.36 =============== 202-00260 Rem of Pvmt Mkg (On-Call) Sq Foot ================================================ MTCER300-257 R3 FY 20/21 Region Wide Epoxy 02/06/20 74,000.00 0.65 0.66 0.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 74,000.00 0.65 0.66 0.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 74,000.00 0.65 0.66 0.42 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 36 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00400 Rem Bridge Each =================================================== BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 2.00 28000.00 58166.67 75000.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 1.00 150000.00 72894.59 36379.49 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 68666.67 63592.74 62126.50 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 175000.00 72605.83 76998.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 1.00 50000.00 71122.78 75000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 112500.00 71820.68 75999.25 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 2.00 90176.50 40825.75 45000.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 8.00 72578.13 75760.86 75760.86 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 76097.80 52470.79 69608.69 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1.00 117322.07 117322.07 117322.07 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1.00 93388.96 116586.02 116586.02 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 105355.52 116954.05 116954.05 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17.00 82511.12 63264.85 74610.17 =============== 202-00405 Rem of Pilling Each =================================================== NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 11.00 2979.96 2242.73 2242.73 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 11.00 2979.96 2242.73 2242.73 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 2979.96 2242.73 2242.73 =============== 202-00420 Rem Ped Rail Lin Foot =============================================== NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 74.00 12.00 39.00 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 74.00 12.00 39.00 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 74.00 12.00 39.00 50.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 37 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00425 Rem Bridge Railing Lin Foot =============================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 5,109.00 20.00 23.27 22.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 1,215.00 27.00 35.50 31.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 583.00 25.00 25.46 20.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 136.00 30.00 26.81 37.42 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 157.00 55.00 55.00 41.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7,200.00 22.54 26.16 24.06 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 280.00 20.00 19.80 10.60 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 164.00 31.44 47.60 47.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 444.00 24.23 22.27 24.27 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 184.00 35.00 85.66 16.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 184.00 35.00 85.66 16.95 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,828.00 22.93 27.27 23.91 =============== 202-00450 Rem Port Present Str (1) Sq Yard ================================================ IM0761-226 I76/SH52 Interchange 04/02/20 53.00 215.00 386.71 225.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 53.00 215.00 386.71 225.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 399.00 95.00 219.14 160.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 21.00 100.00 219.49 233.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 420.00 95.25 219.16 163.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 473.00 108.67 238.05 170.52 =============== 202-00453 Rem Port Present Str (2) Sq Yard ================================================ NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 220.00 291.00 384.76 352.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 38 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00453 Rem Port Present Str (2) Sq Yard ================================================ NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 33.00 350.00 583.53 567.06 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 483.00 350.00 357.50 350.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 188.00 300.00 345.00 340.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 5.00 300.00 392.22 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 929.00 325.64 371.24 356.43 IM0761-226 I76/SH52 Interchange 04/02/20 104.00 250.00 680.44 530.00 NHPPR100-251 SH 2/ Vasquez 06/25/20 35.00 280.00 622.50 985.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 139.00 257.55 675.35 644.57 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 126.00 185.00 458.71 550.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 21.00 150.00 319.36 321.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 40.00 408.51 685.06 685.06 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 187.00 228.88 450.60 553.17 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 231.00 400.00 376.00 353.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 100.00 400.00 458.92 470.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 331.00 400.00 401.05 388.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,586.00 323.78 443.53 411.54 =============== 202-00460 Rem Port Present Str (3) Sq Yard ================================================ NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 6.00 498.00 1251.82 1111.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 3.00 500.00 1356.32 1312.63 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 33.00 550.00 850.00 1000.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 37.00 475.00 890.00 880.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 79.00 509.03 930.67 964.10 NHPPR100-251 SH 2/ Vasquez 06/25/20 2.00 480.00 1348.35 2139.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 480.00 1348.35 2139.70 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 39 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00460 Rem Port Present Str (3) Sq Yard ================================================ BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 21.00 340.00 931.57 700.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 4.00 300.00 675.37 577.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 8.00 1246.52 1316.77 1316.77 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 33.00 554.91 914.44 834.61 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 36.00 500.00 654.67 614.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 10.00 800.00 1879.39 1435.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 46.00 565.22 920.91 792.48 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 160.00 534.28 925.35 902.75 =============== 202-00495 Rem Port Present Str LUMP SUM =============================================== NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 1.00 15000.00 12807.36 5750.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1.00 10000.00 17412.50 11000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 12500.00 15877.45 8375.00 IM0761-226 I76/SH52 Interchange 04/02/20 1.00 120000.00 257771.43 130000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 120000.00 257771.43 130000.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 70044.01 111373.05 111373.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 70044.01 111373.05 111373.05 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 1.00 5000.00 7425.00 15900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 5000.00 7425.00 15900.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 44008.80 89000.10 54804.61 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 40 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00500 Rem Port Present Str Each =================================================== STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 4.00 2300.00 5950.00 5900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 2300.00 5950.00 5900.00 SFTY2254-091 225 Ramp Improvements 04/09/20 1.00 5000.00 3200.00 4900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 5000.00 3200.00 4900.00 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 1.00 1591.00 1125.00 1900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1591.00 1125.00 1900.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 1.00 1200.00 4705.00 1790.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 2.00 8202.83 9178.44 9178.44 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 5868.55 5823.36 6715.63 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 3710.74 4950.57 5616.32 =============== 202-00502 Rem Port Present Str Cubic Yard ============================================= NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 8.00 1350.00 1239.71 1805.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 1350.00 1239.71 1805.00 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 1.00 3000.00 4070.00 3010.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 3000.00 4070.00 3010.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 1533.33 1554.19 1938.89 =============== 202-00503 Rem Port Present Str Sq Yard ================================================ BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 556.00 720.00 192.71 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 556.00 720.00 192.71 65.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 41 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00503 Rem Port Present Str Sq Yard ================================================ NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 28.00 550.00 682.91 678.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 28.00 550.00 682.91 678.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 584.00 711.85 203.07 94.39 =============== 202-00504 Rem Exp Device Lin Foot =============================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 88.00 170.00 128.21 73.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 618.00 250.00 327.50 490.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 141.00 175.00 143.50 127.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 847.00 229.20 268.86 386.25 NHPPR100-251 SH 2/ Vasquez 06/25/20 648.00 200.00 149.15 125.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 648.00 200.00 149.15 125.30 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 158.00 300.00 204.00 187.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 158.00 300.00 204.00 187.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,653.00 224.52 216.53 264.91 =============== 202-00505 Rem Port of Present Structure Sq Foot ================================================ NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 22.00 150.00 282.43 367.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 2,869.00 175.00 48.35 50.34 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 40.00 230.00 284.50 269.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,931.00 175.56 54.18 55.70 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 442.00 74.88 85.61 85.61 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 442.00 74.88 85.61 85.61 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,373.00 162.37 56.38 59.62 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 42 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00520 Rem of Exp Joint Matl Lin Foot =============================================== NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 146.00 35.00 152.18 141.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 146.00 35.00 152.18 141.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 146.00 35.00 152.18 141.25 =============== 202-00700 Rem Light Standard Each =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 2.00 500.00 750.00 750.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 15.00 500.00 510.00 490.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1.00 580.00 888.00 896.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 18.00 504.44 535.22 541.44 IM0761-226 I76/SH52 Interchange 04/02/20 14.00 375.00 694.70 699.60 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 800.00 287.06 275.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 2.00 2000.00 2140.00 2140.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 1.00 800.00 1130.40 835.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 18.00 602.78 710.70 843.58 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 3.00 400.00 819.14 750.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 17.00 750.00 425.28 411.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 1.00 600.00 873.67 700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 21.00 692.86 501.60 473.19 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1.00 807.45 807.45 807.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 807.45 807.45 807.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 58.00 608.40 590.12 615.08 =============== 202-00705 Rem Light Standard Foundation Each =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 2.00 550.00 650.00 650.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 43 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00705 Rem Light Standard Foundation Each =================================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 15.00 700.00 913.33 880.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1.00 610.00 1067.00 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 18.00 678.33 908.86 866.67 SFTY2254-091 225 Ramp Improvements 04/09/20 3.00 1000.00 710.00 700.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 900.00 654.29 533.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 975.00 678.17 658.38 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 17.00 800.00 456.98 415.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 17.00 800.00 456.98 415.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1.00 807.45 807.45 807.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 807.45 807.45 807.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 762.94 611.13 652.40 =============== 202-00710 Rem Power Pole Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 1.00 1500.00 7473.33 3910.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1500.00 7473.33 3910.00 IM0761-226 I76/SH52 Interchange 04/02/20 2.00 2000.00 564.70 657.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 2000.00 564.70 657.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 1833.33 1783.87 1741.47 =============== 202-00720 Rem CCTV Camera Each =================================================== NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1.00 74.69 80.07 80.07 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 74.69 80.07 80.07 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 74.69 80.07 80.07 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 44 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00725 Rem Ex Lighting Sys LUMP SUM =============================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1.00 15000.00 2875.00 2800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 15000.00 2875.00 2800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 15000.00 2875.00 2800.00 =============== 202-00750 Rem Luminaire Each =================================================== NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 3.00 100.00 543.33 740.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 614.00 130.00 81.87 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 617.00 129.85 83.55 127.99 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 3.00 200.00 82.00 75.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 26.00 100.00 116.31 84.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 29.00 110.34 112.24 83.61 MPC040-061 R2 FY 21 Sign Replacement 10/01/20 1.00 163.91 1225.00 500.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1.00 404.25 404.25 404.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 284.08 951.42 452.13 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 648.00 129.46 86.46 127.00 =============== 202-00805 Rem Overhead Sign Str Each =================================================== HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 2.00 5000.00 5937.50 7635.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 5000.00 5937.50 7635.00 SFTY2254-091 225 Ramp Improvements 04/09/20 1.00 10000.00 6825.00 6650.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 10000.00 6825.00 6650.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 6666.67 6233.33 7306.67 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 45 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00810 Rem Ground Sign Each =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 2.00 200.00 161.79 155.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 7.00 80.00 200.00 200.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 73.00 60.00 79.51 85.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 6.00 68.00 121.34 125.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 22.00 100.00 102.51 105.01 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 4.00 200.00 200.00 200.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 15.00 60.00 143.74 132.48 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 20.00 125.00 126.00 102.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 109.00 85.00 154.58 150.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 1.00 400.00 168.33 165.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 156.00 65.00 84.31 100.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 98.00 75.00 111.01 100.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 1.00 150.00 375.00 500.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 180.00 88.50 102.29 114.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 13.00 200.00 151.67 153.01 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 5.00 150.00 150.00 150.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 3.00 100.00 156.28 175.50 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 14.00 200.00 100.00 91.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 57.00 80.00 69.27 76.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 9.00 200.00 147.00 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 795.00 85.78 103.94 110.43 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 1.00 175.00 175.40 167.84 IM0761-226 I76/SH52 Interchange 04/02/20 79.00 70.00 135.43 159.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 1.00 100.00 402.00 1000.00 SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 495.00 150.00 100.00 100.00 SFTY2254-091 225 Ramp Improvements 04/09/20 4.00 150.00 222.50 215.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 30.00 200.00 121.92 110.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 5.00 70.00 192.67 125.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 3.00 150.00 413.33 815.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 21.00 50.00 226.67 215.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 5.00 100.00 110.38 113.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 1.00 100.00 253.33 350.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 13.00 468.00 259.49 259.49 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 9.00 200.00 2000.00 2500.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 6.00 110.00 141.23 98.17 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 673.00 145.10 151.94 152.08 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 1.00 150.00 335.19 500.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 46 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00810 Rem Ground Sign Each =================================================== STMM086-083 ADA PUEBLO METRO 07/09/20 72.00 80.00 275.00 150.00 MTCER300-255 MTCE R3 FY20/21 Signal Replac 07/09/20 299.00 50.00 91.25 50.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 15.00 70.00 137.50 190.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 2.00 200.00 135.00 115.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 8.00 109.87 78.05 34.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 7.00 80.25 80.25 80.25 MTCE0702-386 Grand Junction 09/03/20 71.00 250.00 86.67 50.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 62.00 75.00 66.33 58.70 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 28.00 340.00 114.27 136.80 SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 534.00 175.00 262.50 350.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 8.00 125.00 159.67 50.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 13.00 150.00 162.94 162.94 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,120.00 135.78 153.55 205.89 MPC040-061 R2 FY 21 Sign Replacement 10/01/20 247.00 68.04 80.00 60.00 MTCE0253-271 FY20 I-25 SIGN REPL PHASE 1 10/08/20 239.00 100.00 121.67 65.00 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 6.00 175.00 237.33 122.00 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 7.00 128.00 235.00 215.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 11.00 200.00 92.50 95.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 15.00 106.60 106.60 106.60 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 10.00 175.00 157.42 124.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 200.00 153.38 164.12 164.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 735.00 107.32 117.56 94.29 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,323.00 119.41 133.15 147.47 =============== 202-00815 Rem of Sign (Special) Each =================================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 5.00 1000.00 1001.67 530.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 1000.00 1001.67 530.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 1.00 1000.00 7139.33 8440.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 1000.00 7139.33 8440.00 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 1.00 150.00 633.33 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 150.00 633.33 500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 878.57 1825.86 1655.71 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 47 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00821 Rem Sign Panel Each =================================================== STA0142-066 SH 14 New Raymer West 01/09/20 38.00 80.00 39.00 26.00 FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 6.00 40.00 657.23 510.00 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 60.00 50.00 84.00 90.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 2.00 30.00 110.00 110.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 223.00 30.00 69.13 68.26 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 8.00 100.00 135.00 120.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 17.00 60.00 102.18 99.36 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 37.00 39.20 150.32 200.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 1.00 60.00 181.67 275.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 4.00 30.00 84.31 100.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 55.00 75.00 46.59 65.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 88.00 60.00 61.46 51.35 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 58.00 30.00 47.93 40.80 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 63.00 80.00 66.00 66.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 4.00 40.00 93.00 90.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 17.00 70.00 234.40 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 681.00 49.95 83.77 77.04 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 85.00 110.00 82.58 108.29 SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 366.00 65.00 50.00 50.00 C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 1.00 53.00 140.33 70.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 2.00 50.00 71.00 70.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 454.00 73.33 63.82 61.05 MTCER300-255 MTCE R3 FY20/21 Signal Replac 07/09/20 2,862.00 30.00 29.00 6.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 4.00 65.00 55.00 75.00 MTCE0702-386 Grand Junction 09/03/20 310.00 50.00 68.33 30.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 10.00 50.00 53.19 41.10 SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 224.00 65.00 192.50 300.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 4.00 50.00 54.31 54.31 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,414.00 34.24 37.65 27.71 MPC040-061 R2 FY 21 Sign Replacement 10/01/20 330.00 31.83 130.00 75.00 MTCE0253-271 FY20 I-25 SIGN REPL PHASE 1 10/08/20 3.00 60.00 51.67 85.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 48 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00821 Rem Sign Panel Each =================================================== NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 30.00 95.00 306.25 375.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 14.00 100.00 89.00 95.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 377.00 39.61 147.80 99.69 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,926.00 40.42 49.06 43.11 =============== 202-00823 Rem Dynamic Message Sign Each =================================================== NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1.00 2453.37 2629.99 2629.99 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 2453.37 2629.99 2629.99 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2453.37 2629.99 2629.99 =============== 202-00825 Rem Flashing Beacon Each =================================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 4.00 50.00 416.01 402.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 50.00 416.01 402.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 50.00 416.01 402.00 =============== 202-00827 Rem of Pull Box Each =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 2.00 200.00 350.00 350.00 STRR300-249 Grand and Jackson Counties AD 03/05/20 8.00 300.00 431.00 300.00 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 4.00 300.00 451.37 200.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 12.00 200.00 685.00 660.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1.00 350.00 249.17 260.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 27.00 250.00 522.32 447.41 IM0761-226 I76/SH52 Interchange 04/02/20 4.00 1000.00 138.69 104.94 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 18.00 350.00 326.67 195.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 5.00 150.00 247.00 220.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 2.00 180.00 277.67 600.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 10.00 482.00 481.50 481.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 39.00 416.15 280.61 283.20 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 49 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00827 Rem of Pull Box Each =================================================== STMM086-083 ADA PUEBLO METRO 07/09/20 1.00 300.00 637.50 575.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 9.00 400.00 360.00 200.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 106.00 550.00 543.00 385.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 36.00 650.00 686.19 647.97 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 7.00 260.00 278.20 278.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 159.00 549.81 565.50 430.56 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 2.00 231.00 231.00 231.00 CR100-342 US-6 at Garrison 12/17/20 22.00 250.00 335.42 150.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 2.00 176.35 189.05 189.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 26.00 242.87 331.73 159.23 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 251.00 465.00 508.47 381.37 =============== 202-00828 Rem Traf Sig Equipment LUMP SUM =============================================== C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 1.00 15000.00 15000.00 10000.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1.00 30000.00 20783.33 20000.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1.00 6000.00 12621.25 11000.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1.00 8000.00 5014.00 5152.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1.00 12000.00 24136.00 22200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 14200.00 16201.40 13670.40 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 12000.00 6241.34 6077.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 1.00 15000.00 24954.12 20585.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 1.00 27500.00 34698.33 45295.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 1.00 10000.00 19395.00 8885.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 1.00 15000.00 17626.00 21656.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 15900.00 17054.68 20499.70 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 1.00 50000.00 33000.00 31000.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 50 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00828 Rem Traf Sig Equipment LUMP SUM =============================================== FSAC010-124 US 40, US 287, SH 88 08/06/20 1.00 18000.00 11775.00 7500.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1.00 15000.00 7270.00 6600.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 1.00 12000.00 8960.33 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 23750.00 11939.73 12025.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 1.00 15000.00 22896.67 25000.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 1.00 10000.00 7632.25 6094.00 FSA1211-098 SH 121 & 1ST AVE 11/19/20 1.00 13000.00 7100.67 6780.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 1.00 15000.00 53637.50 67275.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1.00 15145.54 16235.87 16235.87 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 13629.11 18771.68 24276.97 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19.00 16507.66 16033.70 17912.39 =============== 202-00830 Rem Traf Sig Face Each =================================================== C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 1.00 250.00 241.61 158.04 SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 3.00 75.00 1750.00 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 118.75 1064.37 2289.51 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 118.75 1064.37 2289.51 =============== 202-00831 Rem Traf Sig Head Each =================================================== FSA2873-194 US 287 Longmont Intersection 02/13/20 2.00 125.00 259.17 95.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 3.00 115.00 244.50 247.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 119.00 254.28 186.20 CR100-342 US-6 at Garrison 12/17/20 1.00 150.00 354.00 875.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 150.00 354.00 875.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 124.17 279.21 301.00 =============== 202-00832 Rem of Sign Panel (Spec) Each =================================================== SFTY2254-091 225 Ramp Improvements 04/09/20 3.00 3500.00 597.50 580.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 3500.00 597.50 580.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 3500.00 597.50 580.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 51 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00840 Rem Traf Sig Pole Each =================================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 2.00 1000.00 2550.00 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1000.00 2550.00 2500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1000.00 2550.00 2500.00 =============== 202-00858 Rem Pedestal Pole Each =================================================== SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 3.00 1100.00 570.13 495.67 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 1100.00 570.13 495.67 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 1.00 550.00 594.80 431.98 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 550.00 594.80 431.98 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 962.50 576.30 479.75 =============== 202-00860 Rem Ped Push Button Each =================================================== C1601-082 Hawkins Signal and Curb Ramps 04/30/20 32.00 75.00 566.67 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 32.00 75.00 566.67 100.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 30.00 100.00 98.00 110.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 21.00 120.00 113.00 79.02 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 51.00 108.24 103.53 97.24 CR100-342 US-6 at Garrison 12/17/20 29.00 75.00 98.83 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 29.00 75.00 98.83 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 112.00 90.13 182.17 85.80 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 52 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00889 Rem of Detect Warning Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 30.00 400.00 351.00 288.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 30.00 400.00 351.00 288.00 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 2.00 300.00 375.00 500.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 2.00 350.00 267.50 235.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 325.00 332.00 367.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 34.00 391.18 349.10 297.35 =============== 202-00890 Rem Span Wire Cable Lin Foot =============================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 64.00 5.00 11.33 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 64.00 5.00 11.33 11.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 64.00 5.00 11.33 11.00 =============== 202-00895 Rem of Impact Attenuator Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 2.00 1101.00 2902.67 6238.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 1.00 2500.00 1667.59 1720.18 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 1567.33 2593.90 4732.06 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 1567.33 2593.90 4732.06 =============== 202-00900 Rem Conc Footing Each =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 2.00 500.00 1500.00 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 500.00 1500.00 1500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 500.00 1500.00 1500.00 =============== 202-01000 Rem Fence Lin Foot =============================================== BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 268.00 3.00 3.66 4.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 53 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01000 Rem Fence Lin Foot =============================================== FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 790.00 2.00 2.65 2.60 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 2,219.00 1.75 2.72 0.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,277.00 1.91 2.78 1.56 IM0761-226 I76/SH52 Interchange 04/02/20 76.00 2.00 3.39 3.07 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 806.00 3.00 4.35 5.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 11,365.00 2.00 0.67 0.77 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 332.00 6.00 8.67 3.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 4,142.00 1.00 0.92 0.92 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 200.00 2.00 8.59 1.25 NH050A-037 US 50A Pueblo Regional Pond -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16,921.00 1.88 0.99 1.07 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 160.00 2.00 13.00 15.00 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 28.00 10.00 33.00 30.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 2,281.00 2.13 2.95 2.50 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 335.00 5.00 6.63 8.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 500.00 2.00 4.92 5.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 17,602.00 0.60 0.66 0.55 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 2,118.00 1.25 1.36 1.36 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 23,024.00 0.93 1.19 1.16 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 3,567.00 3.00 12.98 11.15 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 57,834.00 1.00 1.09 0.95 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 16,095.00 0.71 0.76 0.76 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 77,496.00 1.03 1.42 1.38 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 120,718.00 1.15 1.34 1.30 =============== 202-01015 Rem Rockfall Fence Lin Foot =============================================== NHPP0702-407 PR I-70 Glenwood Springs Griz 11/03/20 150.00 300.00 471.17 155.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 150.00 300.00 471.17 155.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 150.00 300.00 471.17 155.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 54 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01030 Rem of Road Closure Gate Each =================================================== STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 1.00 1500.00 929.92 816.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1500.00 929.92 816.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1.00 1023.75 1023.75 1023.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1023.75 1023.75 1023.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1261.88 943.32 919.88 =============== 202-01035 Rem of Gate Each =================================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1.00 200.00 301.02 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 200.00 301.02 200.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 2.00 128.00 130.36 130.36 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 128.00 130.36 130.36 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 1.00 300.00 290.51 263.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 300.00 290.51 263.10 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 32.00 110.00 108.33 124.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 32.00 110.00 108.33 124.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 36.00 118.78 122.02 130.33 =============== 202-01130 Rem Gdrail Ty 3 Lin Foot =============================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 22,112.00 5.00 4.80 4.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 55 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01130 Rem Gdrail Ty 3 Lin Foot =============================================== BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 753.00 5.00 6.29 4.85 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 4,965.00 6.00 3.48 3.30 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 23,906.00 10.00 5.55 7.09 STR141A-044 SH 141 AND SH 145, FROM SLICK 01/30/20 5,743.00 4.00 3.94 3.80 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 505.00 12.00 6.30 6.49 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 675.00 10.00 9.00 8.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 1,900.00 6.00 6.99 9.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 5,575.00 4.50 7.99 8.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 1,163.00 10.00 8.38 5.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 3,134.00 3.20 3.98 4.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 988.00 8.00 6.23 9.49 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 1,862.50 6.00 3.20 3.30 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 50.00 15.00 11.50 11.50 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 344.00 4.50 8.69 5.18 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 470.00 4.50 3.36 2.25 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 69.00 10.00 23.28 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 74,214.50 6.75 5.14 5.65 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 8,366.00 6.00 7.77 7.04 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 4,871.00 5.00 4.93 4.25 IM0761-226 I76/SH52 Interchange 04/02/20 906.00 7.00 2.82 2.70 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 3,538.00 5.00 4.29 2.65 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 1,103.00 5.00 4.09 3.17 SFTY2254-091 225 Ramp Improvements 04/09/20 1,152.00 20.00 3.75 3.50 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 2,899.00 3.50 3.53 3.52 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 172.00 10.00 24.17 27.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 676.00 5.00 5.91 8.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 375.00 3.00 3.37 3.37 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 775.00 14.00 10.75 11.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 24,833.00 6.22 5.32 5.21 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1,217.00 3.50 3.76 3.50 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 1,075.00 5.00 3.88 4.70 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 1,150.00 4.00 3.79 3.60 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1,533.00 5.00 3.58 3.58 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,975.00 4.40 3.79 3.81 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 631.00 10.00 23.53 20.60 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 56 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01130 Rem Gdrail Ty 3 Lin Foot =============================================== NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 6,887.00 8.00 4.07 3.40 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 15,708.00 7.00 6.77 4.20 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 3,504.00 5.00 3.23 4.00 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 935.00 4.00 10.21 9.81 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 23,245.00 4.50 5.01 2.66 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 232.00 13.00 14.00 14.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 143.00 7.91 7.91 7.91 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 940.00 4.00 4.10 4.35 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 12,873.00 2.79 2.99 2.99 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 65,098.00 5.24 5.32 3.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 169,120.50 6.02 5.17 4.74 =============== 202-01140 Rem Gdrail Ty 4 Lin Foot =============================================== NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 77.00 170.00 92.67 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 77.00 170.00 92.67 21.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 77.00 170.00 92.67 21.00 =============== 202-01170 Rem Gdrail Ty 7 Lin Foot =============================================== NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 300.00 10.00 36.91 33.82 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 347.00 50.00 16.50 18.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 165.00 65.00 70.40 37.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 812.00 38.27 39.50 27.71 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 50.00 30.00 90.00 28.00 IM0761-226 I76/SH52 Interchange 04/02/20 350.00 11.00 25.54 18.99 SFTY2254-091 225 Ramp Improvements 04/09/20 1,068.00 70.00 24.50 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,468.00 54.57 26.44 23.67 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 52.00 28.00 88.00 115.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 328.00 5.00 26.39 26.39 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 380.00 8.15 41.22 38.52 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 57 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01170 Rem Gdrail Ty 7 Lin Foot =============================================== NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 740.00 40.00 26.37 24.10 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 50.00 40.00 36.50 53.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 81.00 29.40 29.40 29.40 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 413.00 5.00 14.98 14.98 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,284.00 28.07 25.53 22.63 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,944.00 38.12 29.86 25.59 =============== 202-01175 Rem of Guardrail (Spec) Lin Foot =============================================== NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 50.00 27.00 67.50 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 50.00 27.00 67.50 100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 27.00 67.50 100.00 =============== 202-01180 Rem Median Barrier Lin Foot =============================================== NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 112.00 75.00 75.00 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 112.00 75.00 75.00 90.00 SFTY2254-091 225 Ramp Improvements 04/09/20 32.00 50.00 59.50 85.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 32.00 50.00 59.50 85.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 144.00 69.44 71.56 88.89 =============== 202-01200 Rem Tensioned Cable Barrier Lin Foot =============================================== IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 1,262.00 5.00 5.09 3.17 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,262.00 5.00 5.09 3.17 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 22,797.00 3.88 4.31 4.31 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 22,797.00 3.88 4.31 4.31 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 24,059.00 3.94 4.39 4.25 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 58 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01300 Rem End Anchorage Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 52.00 324.00 311.00 380.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 8.00 400.00 446.06 300.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 12.00 300.00 347.50 330.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 72.00 400.00 151.98 103.96 STR141A-044 SH 141 AND SH 145, FROM SLICK 01/30/20 22.00 350.00 381.93 395.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 4.00 300.00 427.00 354.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 51.00 300.00 380.67 400.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 6.00 375.00 284.91 210.00 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 10.00 300.00 622.50 1025.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 2.00 400.00 550.00 550.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 1.00 300.00 654.97 625.21 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 5.00 300.00 404.22 340.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 245.00 344.89 329.66 322.64 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 29.00 350.00 463.08 308.62 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 24.00 200.00 332.50 400.00 IM0761-226 I76/SH52 Interchange 04/02/20 9.00 250.00 239.55 233.20 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 22.00 400.00 412.38 220.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 11.00 300.00 444.45 388.89 SFTY2254-091 225 Ramp Improvements 04/09/20 3.00 300.00 277.50 270.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 12.00 350.00 286.53 242.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 4.00 350.00 1002.67 893.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 4.00 400.00 379.20 500.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 2.00 241.00 244.42 244.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 120.00 315.68 375.54 329.51 STR184B-006 CULVERTS SH 184 08/06/20 2.00 400.00 350.00 350.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 2.00 350.00 246.14 230.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 6.00 300.00 384.23 411.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 2.00 400.00 356.27 342.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 15.00 300.00 238.98 238.98 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 27.00 318.52 327.79 292.40 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 29.00 400.00 467.33 452.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 59 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01300 Rem End Anchorage Each =================================================== NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 34.00 330.00 368.33 240.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 12.00 400.00 475.00 255.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 19.00 350.00 402.25 400.00 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 10.00 350.00 595.85 918.45 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 24.00 400.00 435.97 320.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 1.00 1000.00 352.50 355.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 8.00 350.00 432.83 404.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 39.00 228.43 244.42 244.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 176.00 341.36 418.44 351.77 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 568.00 336.37 367.97 331.68 =============== 202-01400 Removal of Cattle Guard Each =================================================== NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 2.00 2000.00 1941.67 2560.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 2000.00 1941.67 2560.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 2000.00 1941.67 2560.00 =============== 202-04001 Plug Culvert Each =================================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 16.00 4000.00 2788.59 4300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16.00 4000.00 2788.59 4300.00 IM0761-226 I76/SH52 Interchange 04/02/20 2.00 3000.00 1220.30 472.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 3000.00 1220.30 472.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 1.00 2500.00 5217.07 9174.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 2500.00 5217.07 9174.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19.00 3815.79 2755.32 4153.59 =============== 202-04002 Clean Culvert Each =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 8.00 1500.00 3000.00 3000.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 60 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-04002 Clean Culvert Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 82.00 1650.00 2132.98 2668.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 2.00 1750.00 2221.53 2000.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 75.00 364.00 930.86 595.06 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 2.00 1000.00 2280.00 950.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 14.00 3000.00 2813.08 3939.23 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1.00 2400.00 3083.13 2700.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1.00 1500.00 2519.43 3622.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 16.00 3000.00 1636.00 1350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 201.00 1363.18 1821.74 1872.52 IM0761-226 I76/SH52 Interchange 04/02/20 9.00 2000.00 2098.88 582.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 13.00 1500.00 2287.50 1875.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 1.00 3000.00 6050.00 2200.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 2.00 3500.00 2558.00 1190.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 1.00 2000.00 1934.25 690.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 26.00 1903.85 2270.53 1341.65 STR184B-006 CULVERTS SH 184 08/06/20 5.00 5000.00 4900.00 4900.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 1.00 2567.45 2562.15 1860.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 3.00 2000.00 1731.43 3000.00 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 5.00 2000.00 2817.00 5000.00 CR400-374 FY 20 Culvert Prioritization 09/17/20 3.00 1000.00 5281.75 2400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 17.00 2739.26 3030.47 3974.12 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 3.00 5000.00 2607.33 1622.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 1.00 1000.00 1516.25 1710.00 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 17.00 3000.00 3566.30 3315.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 7.00 2400.00 3250.00 2250.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 1.00 2000.00 9820.00 3850.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 29.00 2958.62 3759.91 2845.90 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 273.00 1669.84 2183.40 2056.23 =============== 202-04003 Clean Culvert (Spec) Each =================================================== NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 1.00 2000.00 18356.67 15000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 2000.00 18356.67 15000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2000.00 18356.67 15000.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 61 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-04004 Plug Culvert (Spec) Each =================================================== NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 2.00 3000.00 4400.00 4400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 3000.00 4400.00 4400.00 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 3.00 17000.00 25756.00 22980.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 17000.00 25756.00 22980.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 11400.00 23243.53 15548.00 =============== 202-04005 Clean Valve Box Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 45.00 277.00 625.09 400.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 2.00 300.00 900.00 900.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 2.00 150.00 510.00 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 49.00 272.76 624.74 414.29 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 2.00 200.00 358.00 535.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 2.00 300.00 435.00 325.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 15.00 500.00 315.50 53.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 4.00 300.00 550.57 697.87 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 2.00 250.00 426.71 620.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 25.00 408.00 368.36 261.86 CR100-342 US-6 at Garrison 12/17/20 3.00 250.00 458.00 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 250.00 458.00 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 77.00 315.78 498.05 350.60 =============== 202-04006 Clean Culvert Hour =================================================== NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 10.00 300.00 475.50 475.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 300.00 475.50 475.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 62 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-04006 Clean Culvert Hour =================================================== STM094A-038 SH94 WB PASSING LANE 09/01/20 8.00 593.58 593.58 593.58 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 10.00 312.00 423.59 423.59 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 18.00 437.15 499.14 499.14 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 66.00 375.00 420.42 420.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 66.00 375.00 420.42 420.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 94.00 378.92 441.35 441.35 =============== 202-04008 Clean Culvert Lin Foot =============================================== STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 645.00 26.00 65.00 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 645.00 26.00 65.00 65.00 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 554.00 35.00 59.00 68.00 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 122.00 65.00 49.75 45.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 501.00 65.00 107.50 85.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,177.00 50.88 74.94 72.85 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 2,000.00 30.00 90.40 36.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,000.00 30.00 90.40 36.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,822.00 35.75 83.98 52.35 =============== 202-04010 Clean Inlet Each =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 7.00 900.00 847.18 205.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 63 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-04010 Clean Inlet Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 4.00 328.00 1302.28 1112.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 77.00 600.00 900.00 800.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 18.00 850.00 2588.01 3346.01 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 5.00 300.00 1074.00 950.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 111.00 636.14 1177.57 1193.34 IM0761-226 I76/SH52 Interchange 04/02/20 6.00 1500.00 608.44 770.00 SFTY2254-091 225 Ramp Improvements 04/09/20 14.00 1250.00 1117.50 1125.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 8.00 2000.00 1792.57 412.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 3.00 550.00 1292.00 800.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 4.00 1500.00 2080.00 1240.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 1.00 1500.00 1647.67 368.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 10.00 1200.00 991.67 800.00 NHPPR100-251 SH 2/ Vasquez 06/25/20 1.00 1000.00 1798.85 1748.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 47.00 1375.53 1297.09 875.46 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 23.00 1000.00 930.00 960.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 6.00 320.00 1077.86 300.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 67.00 1000.00 427.50 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 96.00 957.50 530.42 388.33 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 9.00 1000.00 2132.48 1600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9.00 1000.00 2132.48 1600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 263.00 898.03 896.30 856.61 =============== 202-04050 Clean Exp Joint Lin Foot =============================================== BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 509.00 20.00 22.71 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 509.00 20.00 22.71 10.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 509.00 20.00 22.71 10.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 64 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-04100 Abandon Well Each =================================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 2.00 2000.00 2198.33 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 2000.00 2198.33 3000.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 3000.00 4509.34 2750.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 3000.00 4509.34 2750.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 2333.33 3518.91 2916.67 =============== 202-05010 Sawing Concrete (10 In) Lin Foot =============================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 200.00 6.50 10.15 5.21 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 200.00 6.50 10.15 5.21 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 200.00 6.50 10.15 5.21 =============== 202-05026 Sawing Asphalt Mat (6 In) Lin Foot =============================================== SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 682.00 6.00 6.25 3.47 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 682.00 6.00 6.25 3.47 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 862.00 10.00 10.69 6.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 500.00 9.00 6.64 11.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,362.00 9.63 9.46 7.91 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,044.00 8.42 8.15 6.43 =============== 202-05030 Sawing Asphalt Mat (10 In) Lin Foot =============================================== BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 676.00 4.00 7.41 6.32 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 676.00 4.00 7.41 6.32 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 65 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-05030 Sawing Asphalt Mat (10 In) Lin Foot =============================================== FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 875.00 5.78 5.78 5.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 875.00 5.78 5.78 5.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,551.00 5.00 7.16 6.02 =============== 202-05100 Sandblasting Reinf Steel Sq Yard ================================================ STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 158.00 75.00 47.07 49.02 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 158.00 75.00 47.07 49.02 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 136.00 40.00 10.68 11.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 136.00 40.00 10.68 11.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 294.00 58.81 26.56 31.57 =============== 202-05150 Sandblasting Sq Foot ================================================ NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 260,928.00 1.56 1.10 1.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 260,928.00 1.56 1.10 1.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 260,928.00 1.56 1.10 1.10 =============== 202-06530 Clean Drain Pipe (Spec) Each =================================================== STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 16.00 125.00 409.50 113.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16.00 125.00 409.50 113.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 125.00 409.50 113.00 =============== 202-07000 Oblit Old Road LUMP SUM =============================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1.00 10000.00 10958.33 10800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 10000.00 10958.33 10800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 10000.00 10958.33 10800.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 66 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00000 Uncl Excav Cubic Yard ============================================= STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 2,260.00 18.00 23.50 22.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 657.00 9.00 26.79 26.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 2,523.00 50.00 39.54 40.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 15.00 250.00 153.35 175.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 131.00 100.00 23.00 23.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 9,971.00 15.00 15.67 14.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1,430.00 25.00 33.93 27.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16,987.00 22.07 18.70 20.74 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 100.00 20.00 62.50 70.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 100.00 20.00 62.50 70.00 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 2,145.00 37.50 64.38 85.00 STMM086-083 ADA PUEBLO METRO 07/09/20 51.00 100.00 69.00 48.00 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 370.00 32.00 23.49 22.42 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 15,816.00 13.97 13.94 13.94 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 18,382.00 17.32 31.14 22.50 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 343.00 50.00 55.63 52.90 NHPP0702-407 PR I-70 Glenwood Springs Griz 11/03/20 400.00 40.00 89.53 125.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 230.00 50.00 112.50 65.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 2,500.00 30.00 23.73 24.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,473.00 34.45 33.78 41.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 38,942.00 20.93 22.85 23.52 =============== 203-00010 Uncl Excav (CIP) Cubic Yard ============================================= FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 725.00 25.00 41.80 30.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 625.00 50.00 36.00 36.00 PWQM240-172 El Paso County, north Colorad 01/23/20 1,297.00 20.00 53.75 98.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 67 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00010 Uncl Excav (CIP) Cubic Yard ============================================= STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 674.00 88.00 42.15 36.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 2,282.00 27.00 34.09 24.20 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 14,547.00 20.00 13.34 9.75 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 643.00 30.00 24.82 15.64 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 7,292.00 25.00 33.05 33.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 28,085.00 24.52 26.48 22.91 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 1,656.00 22.00 25.37 31.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 6,877.00 23.00 39.38 43.75 SFTY2254-091 225 Ramp Improvements 04/09/20 6,310.00 45.00 43.00 47.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 623,574.00 10.00 9.55 8.05 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1601-082 Hawkins Signal and Curb Ramps 04/30/20 336.00 50.00 96.33 192.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 2,722.00 30.00 59.33 40.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 1,547.00 30.00 30.77 35.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 148,836.00 7.00 8.34 8.34 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 51,984.00 12.00 16.66 8.30 NH050A-037 US 50A Pueblo Regional Pond -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 843,842.00 10.10 10.34 8.97 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 445.00 45.00 55.00 60.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 8.00 25.00 325.00 400.00 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 2,584.00 25.00 33.93 17.65 FSAC010-124 US 40, US 287, SH 88 08/06/20 85.00 25.00 100.67 97.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 1,522.00 45.19 31.12 19.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 6,250.00 21.43 21.43 21.43 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 14,362.00 12.00 20.49 15.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 25,256.00 18.29 23.44 18.44 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 121.00 65.00 70.53 82.45 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 1,901.00 50.00 81.08 52.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,022.00 50.90 80.07 54.43 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 899,205.00 10.87 10.93 9.77 =============== 203-00014 Uncl Ex (River Bttm Matl Salv and Repl) Cubic Yard ============================================= NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 630.00 32.82 53.82 53.82 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 630.00 32.82 53.82 53.82 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 630.00 32.82 53.82 53.82 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 68 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00040 Uncl Excav (Spec) Cubic Yard ============================================= C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 273.00 75.00 33.97 11.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 273.00 75.00 33.97 11.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 273.00 75.00 33.97 11.50 =============== 203-00050 Unsuitable Material Cubic Yard ============================================= NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 1,419.00 30.00 28.00 35.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 50.00 55.00 91.38 100.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC PWQM240-172 El Paso County, north Colorad 01/23/20 260.00 40.00 49.50 48.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 1,479.00 20.00 26.75 15.50 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 100.00 50.00 73.26 79.79 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 35.00 100.00 96.00 96.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 200.00 40.00 72.60 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,543.00 28.73 37.29 32.01 IM0761-226 I76/SH52 Interchange 04/02/20 1,000.00 35.00 24.90 40.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 545.00 35.00 108.00 84.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 20.00 65.00 77.25 13.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 100.00 80.00 49.42 25.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 50.00 64.00 64.50 64.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,715.00 38.82 42.17 53.51 FSAC010-124 US 40, US 287, SH 88 08/06/20 15.00 55.00 143.33 250.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 500.00 50.00 59.03 30.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 550.00 60.00 53.56 29.80 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 100.00 40.00 42.57 34.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,165.00 53.93 55.53 33.14 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 3,000.00 41.48 41.48 41.48 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 69 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00050 Unsuitable Material Cubic Yard ============================================= NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 20,000.00 10.50 11.33 5.20 CR100-342 US-6 at Garrison 12/17/20 250.00 50.00 51.00 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 23,250.00 14.92 12.53 10.31 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 29,673.00 19.48 17.86 16.29 =============== 203-00060 Emb Matl (CIP) Cubic Yard ============================================= NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 4,704.00 18.00 69.07 39.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 1,840.00 27.00 68.67 55.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 250.00 50.00 58.80 51.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 8,647.00 40.00 49.00 48.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 497.00 80.00 36.77 40.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 2,181.00 14.00 36.29 45.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 153,686.00 20.00 24.36 20.84 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 592.00 20.00 49.11 60.29 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 13,669.00 15.00 32.62 30.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 192,375.00 15.00 19.28 17.50 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1,732.00 35.00 78.60 56.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 380,173.00 17.89 21.87 20.89 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 585.00 25.00 72.35 58.00 IM0761-226 I76/SH52 Interchange 04/02/20 58,002.00 17.00 22.55 17.35 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 9,589.00 22.00 28.47 18.50 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 16.00 75.00 137.50 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 68,192.00 17.79 23.62 17.86 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 763.00 15.00 24.34 26.11 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 209.00 35.00 69.75 52.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 344.00 30.00 62.50 50.00 STR184B-006 CULVERTS SH 184 08/06/20 27.00 180.00 170.00 170.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 5,300.00 45.00 34.08 25.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 11,840.00 10.00 19.11 14.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 18,483.00 21.15 24.68 19.24 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 186.00 25.00 42.60 40.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 70 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00060 Emb Matl (CIP) Cubic Yard ============================================= NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 896.00 60.00 88.67 92.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 45,695.00 14.79 14.79 14.79 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 211,739.00 13.00 10.35 7.50 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 646,360.00 12.30 13.82 13.82 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 904,876.00 12.64 11.72 12.47 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,371,724.00 14.46 17.84 15.17 =============== 203-00062 Emb Matl (CIP) (Spec) Cubic Yard ============================================= NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 1,419.00 30.00 39.63 39.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,419.00 30.00 39.63 39.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,419.00 30.00 39.63 39.00 =============== 203-00066 Emb Matl (CIP) (R40) Cubic Yard ============================================= FSA2873-194 US 287 Longmont Intersection 02/13/20 761.00 50.00 64.37 87.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 27,336.00 20.00 24.56 18.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 28,097.00 20.81 25.38 20.36 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 178,012.00 30.66 30.01 30.01 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 178,012.00 30.66 30.01 30.01 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 206,109.00 29.32 27.43 28.69 =============== 203-00100 Muck Excav Cubic Yard ============================================= NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 100.00 35.00 40.50 49.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 100.00 35.00 40.50 49.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 200.00 30.00 38.19 40.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 71 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00100 Muck Excav Cubic Yard ============================================= FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 200.00 30.00 38.19 40.00 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 50.00 80.00 126.60 99.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 50.00 80.00 126.60 99.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 350.00 38.57 45.00 51.11 =============== 203-00400 Rock Excav Cubic Yard ============================================= NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 15.00 100.00 293.70 275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15.00 100.00 293.70 275.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 3,500.00 60.00 40.74 20.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,500.00 60.00 40.74 20.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 830.00 400.00 207.26 240.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 830.00 400.00 207.26 240.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,345.00 125.09 62.66 62.91 =============== 203-00450 Rem Rock Each =================================================== IM0761-226 I76/SH52 Interchange 04/02/20 7.00 12.00 262.69 115.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7.00 12.00 262.69 115.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 12.00 262.69 115.00 =============== 203-00510 Rock Fill (Spec) Cubic Yard ============================================= NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 8,117.00 25.00 63.73 27.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8,117.00 25.00 63.73 27.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,117.00 25.00 63.73 27.10 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 72 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00592 Rock Staining Sq Foot ================================================ C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 18,178.00 2.50 3.70 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 18,178.00 2.50 3.70 2.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18,178.00 2.50 3.70 2.00 =============== 203-00598 Rock Scaling Hour =================================================== NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 300.00 230.00 231.67 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 300.00 230.00 231.67 150.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 300.00 230.00 231.67 150.00 =============== 203-00599 Rock Scaler Hour =================================================== NHPP0702-407 PR I-70 Glenwood Springs Griz 11/03/20 40.00 400.00 187.56 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 40.00 400.00 187.56 125.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 400.00 187.56 125.00 =============== 203-01100 Proof Rolling Hour =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 90.00 128.00 104.67 89.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 10.00 100.00 73.88 90.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 5.00 100.00 163.00 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 105.00 124.00 107.34 91.52 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 30.00 100.00 191.94 110.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 12.00 150.00 119.67 112.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 20.00 127.00 136.10 136.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 62.00 118.39 179.37 118.81 STM094A-038 SH94 WB PASSING LANE 09/01/20 40.00 112.66 112.66 112.66 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 73 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01100 Proof Rolling Hour =================================================== STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 10.00 100.00 106.13 98.60 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 100.00 118.67 129.71 129.71 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 150.00 115.82 119.23 123.09 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 84.00 161.70 161.70 161.70 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 40.00 100.00 118.33 101.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 200.00 101.73 127.99 127.99 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 324.00 117.06 128.97 133.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 641.00 118.04 133.58 122.71 =============== 203-01140 Rolling Hour =================================================== NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 70.00 100.00 106.67 100.01 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 20.00 125.00 82.00 82.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 90.00 105.56 104.52 96.01 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 40.00 150.00 100.30 123.28 SFTY2254-091 225 Ramp Improvements 04/09/20 10.00 200.00 137.50 155.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 16.00 90.00 126.67 119.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 66.00 143.03 110.99 127.05 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 156.00 121.41 107.43 109.14 =============== 203-01500 Blading Hour =================================================== STA0142-066 SH 14 New Raymer West 01/09/20 100.00 143.00 153.75 105.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 10.00 150.00 110.00 110.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 90.00 140.00 191.10 190.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 50.00 150.00 144.41 130.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STA006A-067 SH 6 Merino to Atwood 01/16/20 200.00 160.00 120.01 100.00 PWQM240-172 El Paso County, north Colorad 01/23/20 8.00 150.00 271.50 333.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 10.00 150.00 159.60 108.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 74 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01500 Blading Hour =================================================== STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 110.00 150.00 144.19 140.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 40.00 145.00 152.70 135.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 100.00 150.00 109.29 125.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 90.00 150.00 115.00 110.01 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 20.00 180.00 107.00 95.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 20.00 125.00 93.00 93.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 50.00 150.00 77.33 90.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 20.00 155.00 155.62 154.34 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 40.00 150.00 168.33 230.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 104.00 150.00 165.63 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,062.00 150.38 145.50 130.22 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 40.00 150.00 117.12 117.87 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 20.00 140.00 130.50 120.00 IM0761-226 I76/SH52 Interchange 04/02/20 40.00 150.00 144.20 105.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 20.00 150.00 96.67 30.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 40.00 150.00 134.37 119.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 30.00 100.00 90.00 100.00 SFTY2254-091 225 Ramp Improvements 04/09/20 30.00 200.00 172.50 175.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 100.00 175.00 176.96 130.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 16.00 180.00 169.00 159.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 40.00 150.00 149.75 115.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 25.00 150.00 136.19 110.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 40.00 214.00 237.53 237.53 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 50.00 160.00 137.38 150.00 NH050A-037 US 50A Pueblo Regional Pond -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 491.00 161.89 151.32 132.02 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 24.00 150.00 259.88 300.00 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 40.00 160.00 173.11 226.58 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 20.00 250.00 182.50 125.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 80.00 156.36 149.56 160.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 40.00 192.19 192.19 192.19 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 50.00 150.00 135.97 145.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 40.00 140.00 199.68 148.90 CR400-374 FY 20 Culvert Prioritization 09/17/20 9.00 156.00 212.50 150.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 40.00 200.15 230.94 230.94 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 343.00 168.24 169.85 183.80 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 75 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01500 Blading Hour =================================================== STRM331-008 ADA RAMPS WALSENBURG 10/15/20 20.00 175.00 115.00 75.00 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 15.00 140.00 123.52 168.60 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 40.00 200.00 129.00 127.00 NHPP0702-407 PR I-70 Glenwood Springs Griz 11/03/20 20.00 80.00 291.08 135.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 185.00 150.00 141.67 135.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 40.00 150.00 143.57 122.00 C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 20.00 80.00 162.31 151.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 20.00 125.00 137.50 130.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 20.00 170.00 179.28 149.00 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 40.00 125.00 196.73 155.71 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 42.00 220.50 220.50 220.50 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 200.00 170.00 151.00 144.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 200.00 200.15 213.81 213.81 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 862.00 167.91 157.68 159.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,758.00 160.13 153.94 146.29 =============== 203-01510 Backhoe Hour =================================================== PWQM240-172 El Paso County, north Colorad 01/23/20 8.00 125.00 211.50 183.00 STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 40.00 135.00 210.00 210.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 4.00 150.00 254.55 339.60 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 50.00 150.00 123.50 115.00 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 20.00 220.00 94.00 78.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 20.00 125.00 125.85 120.94 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 40.00 150.00 144.83 240.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 182.00 150.55 137.02 167.86 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 10.00 150.00 87.50 81.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 10.00 50.00 75.00 100.00 SFTY2254-091 225 Ramp Improvements 04/09/20 30.00 200.00 192.50 160.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 40.00 219.00 231.52 231.52 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 50.00 125.00 110.81 75.00 NH050A-037 US 50A Pueblo Regional Pond IM025A-048 Northbound I-25 bridge at Exi 05/28/20 10.00 140.00 174.53 130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 150.00 162.73 129.16 139.47 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 76 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01510 Backhoe Hour =================================================== STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 4.00 141.00 165.00 120.00 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 20.00 160.00 175.00 125.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 80.00 146.25 134.01 140.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 40.00 204.71 225.37 225.37 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 144.00 164.25 141.75 161.08 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 20.00 150.00 100.00 75.00 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 15.00 130.00 99.40 130.00 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 120.00 120.00 115.23 85.70 NHPP0702-407 PR I-70 Glenwood Springs Griz 11/03/20 20.00 80.00 176.72 165.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 195.00 150.00 131.67 110.00 C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 20.00 80.00 181.05 101.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 20.00 150.00 113.25 110.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 42.00 199.50 199.50 199.50 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 40.00 100.00 123.75 124.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 200.00 204.71 223.47 223.47 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 692.00 156.24 139.83 145.57 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,168.00 157.18 138.13 150.17 =============== 203-01550 Dozing Hour =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 10.00 175.00 150.00 150.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 90.00 150.00 197.99 210.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 20.00 160.00 162.97 140.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC PWQM240-172 El Paso County, north Colorad 01/23/20 8.00 150.00 320.00 350.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 104.00 150.00 175.00 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 232.00 151.94 180.48 179.31 IM0761-226 I76/SH52 Interchange 04/02/20 40.00 160.00 157.17 105.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 10.00 100.00 90.00 100.00 SFTY2254-091 225 Ramp Improvements 04/09/20 30.00 200.00 202.50 180.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 77 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01550 Dozing Hour =================================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 100.00 160.00 193.14 175.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 10.00 160.00 156.42 110.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 40.00 154.00 283.66 283.66 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 50.00 180.00 160.94 150.00 NH050A-037 US 50A Pueblo Regional Pond -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 280.00 164.86 178.86 171.59 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 40.00 175.00 177.06 206.98 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 20.00 200.00 200.00 200.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 80.00 176.45 170.21 160.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 40.00 144.00 277.69 277.69 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 180.00 171.53 177.16 201.04 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 15.00 160.00 139.92 168.60 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 40.00 200.00 155.33 146.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 130.00 200.00 171.67 130.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 42.00 225.75 225.75 225.75 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 40.00 175.00 196.83 248.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 200.00 144.00 260.56 260.56 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 467.00 174.91 192.05 207.24 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,159.00 167.36 181.79 192.08 =============== 203-01565 Hydraulic Excavator Hour =================================================== FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 10.00 180.00 166.33 179.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 180.00 166.33 179.00 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 40.00 180.00 146.00 105.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 40.00 180.00 146.00 105.00 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 34.00 180.00 127.12 168.60 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 78 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01565 Hydraulic Excavator Hour =================================================== NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 40.00 180.00 177.50 144.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 74.00 180.00 156.61 155.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 124.00 180.00 153.75 140.99 =============== 203-01580 Truck Hour =================================================== STR0341-101 SH 34 North of Grandby Resurf 04/02/20 40.00 125.00 125.75 123.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 40.00 125.00 125.75 123.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 40.00 150.00 101.04 105.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 40.00 150.00 101.04 105.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 80.00 137.50 115.16 114.33 =============== 203-01582 Truck (Dump) Hour =================================================== STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 20.00 155.00 104.00 123.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 10.00 120.00 128.76 157.52 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 20.00 200.00 104.00 85.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 10.00 150.00 90.00 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 60.00 163.33 107.23 110.59 SFTY2254-091 225 Ramp Improvements 04/09/20 20.00 200.00 130.00 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20.00 200.00 130.00 150.00 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 40.00 116.00 157.25 200.00 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 40.00 130.00 110.00 95.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 80.00 123.00 131.00 147.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 79 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01582 Truck (Dump) Hour =================================================== CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 75.00 120.00 93.00 111.00 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 120.00 120.00 122.00 136.00 NHPP0702-407 PR I-70 Glenwood Springs Griz 11/03/20 20.00 80.00 136.05 120.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 99.00 130.00 135.67 140.00 C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 20.00 80.00 117.90 93.50 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 20.00 140.00 116.10 110.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 146.00 150.00 126.96 100.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 40.00 100.00 112.33 118.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 540.00 126.24 119.49 119.06 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 700.00 131.16 120.65 122.47 =============== 203-01590 Front End Loader (Rubber) Hour =================================================== NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 25.00 120.00 190.01 210.02 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 25.00 120.00 190.01 210.02 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 10.00 160.00 105.00 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 160.00 105.00 120.00 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 40.00 160.00 197.00 200.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 20.00 150.00 123.67 110.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 20.00 150.00 140.45 112.26 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 40.00 150.00 128.80 95.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 120.00 153.33 148.56 135.38 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 120.00 150.00 157.33 147.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 85.00 150.00 173.33 140.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 73.00 175.00 166.68 111.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 80 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01590 Front End Loader (Rubber) Hour =================================================== NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 40.00 150.00 141.83 150.00 CR100-342 US-6 at Garrison 12/17/20 20.00 150.00 102.50 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 338.00 155.40 155.24 130.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 493.00 153.19 153.42 135.37 =============== 203-01594 Combination Loader Hour =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 10.00 130.00 100.00 100.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 10.00 120.00 176.11 185.00 PWQM240-172 El Paso County, north Colorad 01/23/20 8.00 150.00 140.00 110.00 STR141A-044 SH 141 AND SH 145, FROM SLICK 01/30/20 10.00 200.00 133.06 80.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 20.00 122.00 99.00 99.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 40.00 150.00 131.67 110.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 20.00 125.00 141.00 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 118.00 141.02 136.00 117.88 IM0761-226 I76/SH52 Interchange 04/02/20 40.00 120.00 109.94 105.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 22.00 130.00 83.33 30.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 40.00 125.00 120.51 78.80 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 10.00 100.00 75.00 100.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 16.00 120.00 134.33 112.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 10.00 105.00 98.33 100.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 40.00 176.00 183.00 183.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 178.00 132.98 114.57 107.44 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 40.00 110.00 177.13 200.00 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 30.00 130.00 128.14 109.96 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 20.00 150.00 175.00 125.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 30.00 210.00 117.50 125.00 STR184B-006 CULVERTS SH 184 08/06/20 25.00 150.00 110.00 110.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 20.00 120.00 168.57 65.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 40.00 164.58 181.43 181.43 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 205.00 147.97 153.58 140.76 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 45.00 120.00 102.20 127.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 81 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01594 Combination Loader Hour =================================================== NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 40.00 125.00 120.23 85.70 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 40.00 150.00 143.38 130.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 200.00 164.58 164.49 164.49 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 325.00 151.74 131.62 145.36 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 826.00 145.23 133.66 132.12 =============== 203-01597 Potholing Hour =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 50.00 250.00 204.04 190.00 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 16.00 300.00 281.67 300.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 50.00 250.00 226.33 264.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 20.00 250.00 277.95 250.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 40.00 400.00 310.00 260.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 20.00 250.00 307.52 315.03 PWQM240-172 El Paso County, north Colorad 01/23/20 40.00 250.00 310.00 290.00 STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 10.00 300.00 670.00 670.00 STR141A-044 SH 141 AND SH 145, FROM SLICK 01/30/20 8.00 500.00 389.20 500.00 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 200.00 250.00 169.00 170.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 20.00 250.00 255.60 238.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 60.00 210.00 336.67 300.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 20.00 260.00 293.00 300.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 10.00 200.00 256.83 240.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 60.00 460.00 266.36 275.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 100.00 300.00 212.50 325.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 40.00 235.00 304.69 275.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 120.00 175.00 220.00 120.01 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 80.00 400.00 287.50 300.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 40.00 400.00 385.00 385.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 10.00 200.00 406.08 462.15 STRR300-249 Grand and Jackson Counties AD 03/05/20 40.00 250.00 410.00 380.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 80.00 250.00 393.33 270.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 100.00 260.00 313.75 300.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 80.00 250.00 192.60 279.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 40.00 250.00 344.20 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,354.00 274.45 268.29 264.55 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 40.00 400.00 380.80 676.79 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 100.00 300.00 414.50 450.00 IM0761-226 I76/SH52 Interchange 04/02/20 200.00 250.00 264.84 196.10 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 82 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01597 Potholing Hour =================================================== STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 40.00 310.00 325.00 310.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 40.00 300.00 293.56 314.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 10.00 260.00 231.25 312.50 SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 150.00 300.00 275.00 275.00 SFTY2254-091 225 Ramp Improvements 04/09/20 60.00 300.00 295.00 240.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 275.00 270.00 260.47 203.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 80.00 240.00 256.67 185.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 40.00 300.00 395.00 500.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 60.00 300.00 352.67 286.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 20.00 230.00 254.38 235.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 260.00 230.00 223.33 175.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 8.00 275.00 355.53 275.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 250.00 200.00 214.75 212.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 30.00 230.00 158.33 250.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 80.00 360.00 368.59 368.59 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 250.00 200.00 155.70 1.00 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 80.00 275.00 125.00 50.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 20.00 350.00 261.67 225.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 175.00 250.00 173.60 175.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,268.00 257.72 239.96 213.72 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 42.00 200.00 174.71 137.00 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 8.00 350.00 325.00 325.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 200.00 265.00 232.50 265.00 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 20.00 240.00 305.00 325.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 90.00 300.00 240.00 225.00 STR184B-006 CULVERTS SH 184 08/06/20 40.00 250.00 260.00 260.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 30.00 250.00 135.00 80.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 72.00 184.82 184.82 184.82 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 80.00 250.00 279.99 214.94 MTCE0702-386 Grand Junction 09/03/20 150.00 400.00 198.33 270.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 100.00 200.00 289.86 350.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 100.00 200.00 308.84 237.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 80.00 250.00 297.70 143.90 SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 175.00 250.00 187.50 100.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 72.00 55.00 199.86 160.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 160.00 336.00 306.32 306.32 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,419.00 259.53 253.80 225.62 MTCE0253-271 FY20 I-25 SIGN REPL PHASE 1 10/08/20 40.00 275.00 381.67 250.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 83 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01597 Potholing Hour =================================================== CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 48.00 250.00 333.20 250.00 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 200.00 400.00 255.70 317.09 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 80.00 350.00 335.33 301.00 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 300.00 200.00 139.22 1.00 NHPP0702-407 PR I-70 Glenwood Springs Griz 11/03/20 60.00 300.00 289.32 250.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 100.00 300.00 351.67 385.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 60.00 350.00 320.25 350.00 C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 60.00 300.00 430.00 533.00 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 20.00 250.00 261.75 212.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 20.00 250.00 267.25 277.00 FSA1211-098 SH 121 & 1ST AVE 11/19/20 60.00 250.00 218.67 175.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 100.00 225.00 387.50 250.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 80.00 300.00 310.20 220.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 40.00 250.00 338.84 530.00 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 100.00 275.00 350.20 320.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 100.00 250.00 285.00 320.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 100.00 210.00 210.00 210.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 80.00 300.00 359.00 402.00 CR100-342 US-6 at Garrison 12/17/20 100.00 225.00 235.83 20.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 200.00 346.00 302.92 302.92 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,948.00 281.67 266.90 246.46 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,989.00 268.00 254.96 235.11 =============== 203-01620 Sweeping Hour =================================================== STR2871-038 US 287 Passing Lanes Springfi 03/05/20 10.00 100.00 129.25 58.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 100.00 129.25 58.50 MTCER200-265 Pueblo 05/28/20 100.00 150.00 143.75 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 100.00 150.00 143.75 50.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 84.00 125.00 200.00 215.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 84.00 125.00 200.00 215.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 194.00 136.60 159.33 121.88 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 84 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01622 Sweeping (With Pickup Broom) Hour =================================================== NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 40.00 170.00 242.10 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 40.00 170.00 242.10 350.00 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 40.00 260.00 164.05 300.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 50.00 175.00 148.00 145.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 90.00 212.78 153.58 213.89 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 130.00 199.62 171.90 255.77 =============== 203-02300 Rock Scaler Hour =================================================== C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 1,872.00 160.00 198.50 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,872.00 160.00 198.50 120.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 400.00 100.00 184.14 160.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 400.00 100.00 184.14 160.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,272.00 149.44 195.47 127.04 =============== 203-02315 Mechanized Scaling Hour =================================================== C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 155.00 500.00 287.50 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 155.00 500.00 287.50 200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 155.00 500.00 287.50 200.00 =============== 203-02330 Laborer Hour =================================================== STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 40.00 45.00 36.75 38.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 85 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-02330 Laborer Hour =================================================== NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 30.00 50.00 56.26 52.51 PWQM240-172 El Paso County, north Colorad 01/23/20 24.00 55.00 42.00 44.00 STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 20.00 45.00 60.00 60.00 STR141A-044 SH 141 AND SH 145, FROM SLICK 01/30/20 20.00 75.00 58.53 35.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 6.00 80.00 129.94 194.88 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 50.00 60.00 85.84 60.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 20.00 50.00 51.00 50.00 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 10.00 40.00 36.00 37.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 40.00 50.00 32.00 32.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 40.00 55.00 45.10 62.71 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 40.00 80.00 48.78 62.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 340.00 56.76 55.44 52.59 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 24.00 80.00 67.31 90.17 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 60.00 50.00 33.33 20.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 40.00 60.00 57.06 35.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 60.00 50.00 41.88 43.75 SFTY2254-091 225 Ramp Improvements 04/09/20 40.00 65.00 62.00 60.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 80.00 55.00 52.80 55.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1601-082 Hawkins Signal and Curb Ramps 04/30/20 20.00 50.00 56.33 71.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 24.00 30.00 57.67 79.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 40.00 46.00 45.53 45.53 IM025A-048 Northbound I-25 bridge at Exi 05/28/20 75.00 52.00 66.98 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 463.00 53.52 53.47 49.03 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 40.00 50.00 84.00 50.00 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 20.00 52.00 51.67 35.00 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 40.00 60.00 72.50 45.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 30.00 60.00 47.50 45.00 STR184B-006 CULVERTS SH 184 08/06/20 25.00 50.00 55.00 55.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 40.00 52.91 52.91 52.91 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 40.00 45.00 98.66 57.30 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 40.00 60.00 61.16 55.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 40.00 46.68 48.47 48.47 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 315.00 52.93 72.35 50.07 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 120.00 45.00 43.76 40.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 86 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-02330 Laborer Hour =================================================== NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 80.00 80.00 57.50 40.50 NHPP0702-407 PR I-70 Glenwood Springs Griz 11/03/20 20.00 120.00 93.54 65.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 80.00 50.00 56.67 50.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 40.00 60.00 54.07 46.25 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 40.00 50.00 56.00 33.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 50.00 50.00 69.50 34.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 20.00 50.00 49.90 65.00 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 40.00 45.00 71.00 36.62 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 40.00 55.00 64.54 40.50 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 120.00 45.00 68.50 95.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 42.00 53.38 53.38 53.38 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 140.00 45.00 53.50 44.80 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 200.00 46.68 52.29 52.29 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,032.00 51.72 55.63 51.38 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,150.00 53.08 57.22 50.87 =============== 206-00000 Str Excav Cubic Yard ============================================= NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 10.00 50.00 299.94 599.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 1,585.00 20.00 19.56 15.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 429.00 60.00 33.70 20.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 338.00 40.00 58.00 58.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 968.00 30.00 22.84 16.23 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 2,942.00 30.00 24.92 30.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 636.00 30.00 23.88 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6,908.00 30.09 23.94 25.74 IM0761-226 I76/SH52 Interchange 04/02/20 335.00 25.00 31.44 14.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 153.00 30.00 66.33 58.00 SFTY2254-091 225 Ramp Improvements 04/09/20 461.00 30.00 57.50 74.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 20,532.00 20.00 12.16 8.13 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 1,040.00 22.00 21.30 30.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1,220.00 36.00 42.41 42.41 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 23,741.00 21.24 13.47 12.53 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 868.00 28.00 24.20 22.42 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 87 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00000 Str Excav Cubic Yard ============================================= STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 73.00 45.00 15.88 20.00 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 532.00 50.00 60.00 60.00 STR184B-006 CULVERTS SH 184 08/06/20 71.00 50.00 75.00 75.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 295.00 38.77 38.81 27.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 6,920.00 20.00 27.34 5.80 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 17,651.00 16.07 21.80 21.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 26,410.00 18.60 26.42 18.59 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 383.00 25.00 51.60 36.40 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 15.00 40.00 91.50 106.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 810.00 19.53 19.53 19.53 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 3,483.00 25.00 18.22 7.70 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 4,805.00 16.98 14.87 14.87 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9,496.00 20.50 20.09 13.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 66,555.00 21.00 18.23 16.47 =============== 206-00010 Str Excav (Spec) Cubic Yard ============================================= C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 1,340.00 100.00 114.30 99.50 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 263.00 40.00 59.38 24.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,603.00 90.16 105.29 87.19 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,603.00 90.16 105.29 87.19 =============== 206-00050 Str Bkfl (Spec) Cubic Yard ============================================= NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 4.00 80.00 240.00 240.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 80.00 240.00 240.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1,235.00 57.39 53.72 53.72 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,235.00 57.39 53.72 53.72 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1,235.00 65.00 67.16 67.16 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,235.00 65.00 67.16 67.16 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,474.00 61.23 60.73 60.73 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 88 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00060 Str Bkfl (Spec) (Flow-Fill) Cubic Yard ============================================= NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 2.00 417.00 1566.20 2539.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 445.00 180.00 238.64 160.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 447.00 181.06 240.87 170.64 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 50.00 160.00 288.33 265.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 50.00 160.00 288.33 265.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 497.00 178.94 242.79 180.14 =============== 206-00065 Str Bkfl (Flow-Fill) Cubic Yard ============================================= NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 1,357.00 200.00 220.38 212.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 2.00 500.00 715.00 730.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 46.00 250.00 236.50 236.50 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 35.00 350.00 311.67 270.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,440.00 205.66 223.29 214.91 IM0761-226 I76/SH52 Interchange 04/02/20 170.00 200.00 213.60 131.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 163.00 40.00 124.00 90.00 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 75.00 400.00 200.00 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 408.00 172.84 188.53 118.11 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 57.00 400.00 205.00 200.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 6.00 700.00 320.00 390.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 3.00 410.00 677.43 200.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 25.00 300.00 228.64 150.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 150.00 215.00 222.19 192.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 241.00 282.07 229.41 195.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 156.00 320.00 342.50 405.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 89 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00065 Str Bkfl (Flow-Fill) Cubic Yard ============================================= NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 128.40 300.00 350.33 335.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 20.00 104.70 241.43 241.43 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 304.40 297.42 346.14 364.73 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,393.40 219.43 232.70 215.46 =============== 206-00066 Str Bkfl (FF Ash) Cubic Yard ============================================= NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 727.00 125.00 325.00 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 727.00 125.00 325.00 300.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 353.00 104.70 169.97 169.97 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 353.00 104.70 169.97 169.97 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,080.00 118.36 294.71 257.50 =============== 206-00100 Str Bkfl (CL 1) Cubic Yard ============================================= BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 1,220.00 40.00 82.59 64.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 302.00 60.00 73.40 63.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 40.00 123.00 78.52 50.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 10.00 100.00 485.73 310.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 78.00 60.00 83.00 83.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 2,208.00 60.00 61.72 60.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 15,652.00 45.00 27.70 23.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 19,510.00 46.87 32.84 30.81 IM0761-226 I76/SH52 Interchange 04/02/20 70.00 225.00 71.86 68.90 SFTY2254-091 225 Ramp Improvements 04/09/20 301.00 50.00 104.00 135.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 3,100.00 30.00 40.86 45.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 555.00 80.00 82.69 63.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1,802.00 67.00 70.57 70.57 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,828.00 49.58 50.51 59.56 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 90 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00100 Str Bkfl (CL 1) Cubic Yard ============================================= STR184B-006 CULVERTS SH 184 08/06/20 9.00 200.00 230.00 230.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 285.00 69.97 80.75 66.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 18.00 25.21 25.21 25.21 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 10,152.00 45.00 48.01 39.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 10,193.00 42.86 47.07 47.07 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20,657.00 44.34 48.80 43.43 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 133.00 50.00 134.77 136.65 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 53.00 60.00 142.00 148.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 925.00 50.93 50.93 50.93 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 5,126.00 50.00 50.70 46.40 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 10,610.00 39.04 43.44 43.44 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 16,847.00 43.18 50.66 45.82 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 62,842.00 45.30 41.77 41.65 =============== 206-00200 Str Bkfl (CL 2) Cubic Yard ============================================= NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 2.00 41.00 493.95 846.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 240.00 25.00 32.88 9.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 192.00 75.00 50.00 40.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 400.00 40.00 38.98 17.90 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 433.00 55.00 29.35 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,267.00 47.59 35.65 22.27 IM0761-226 I76/SH52 Interchange 04/02/20 138.00 25.00 48.65 10.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 16,435.00 35.00 19.70 22.25 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 60.00 30.00 27.35 7.50 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 207.00 66.00 38.37 38.37 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16,840.00 35.28 19.97 22.30 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 91 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00200 Str Bkfl (CL 2) Cubic Yard ============================================= NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 54.00 45.00 28.63 37.57 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 781.00 15.67 32.53 32.53 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 835.00 17.57 31.39 32.86 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1,070.00 35.70 32.46 32.46 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,070.00 35.70 32.46 32.46 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20,012.00 35.34 21.09 23.28 =============== 206-00360 Mechanical Reinforcement of Soil Cubic Yard ============================================= BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 1,220.00 27.00 20.67 13.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 290.00 50.00 65.05 120.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 8,935.00 26.00 17.59 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10,445.00 26.78 18.39 15.12 IM0761-226 I76/SH52 Interchange 04/02/20 70.00 20.00 43.36 21.20 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 13,003.00 19.00 18.23 18.99 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 555.00 28.00 26.20 7.50 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 342.00 19.00 27.49 27.49 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 13,970.00 19.36 18.73 18.75 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 5,033.00 13.24 14.74 14.74 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5,033.00 13.24 14.74 14.74 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 905.00 24.15 24.15 24.15 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 92 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00360 Mechanical Reinforcement of Soil Cubic Yard ============================================= NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 267.00 35.00 40.80 31.10 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 4,211.00 13.24 20.03 20.03 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5,383.00 16.15 25.54 21.27 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 34,831.00 20.21 18.72 17.47 =============== 206-00505 Filter Matl (Spec) Cubic Yard ============================================= NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 21,112.00 16.00 48.19 47.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 21,112.00 16.00 48.19 47.00 C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 256.00 100.00 104.27 88.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 256.00 100.00 104.27 88.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21,368.00 17.01 48.61 47.49 =============== 206-00510 Filter Matl (CL A) Cubic Yard ============================================= NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 103.00 75.00 84.14 89.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 103.00 75.00 84.14 89.00 IM0761-226 I76/SH52 Interchange 04/02/20 6.00 90.00 158.73 197.72 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 4.00 300.00 217.88 260.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 58.00 259.00 134.83 134.83 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 68.00 246.50 162.57 147.74 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 139.00 57.00 99.21 75.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 10,375.00 69.68 67.02 67.02 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10,514.00 69.51 69.78 67.13 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 93 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00510 Filter Matl (CL A) Cubic Yard ============================================= C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 1,152.00 90.00 101.62 93.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 2,101.00 95.00 90.78 75.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1,272.00 92.40 92.40 92.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,525.00 93.00 94.46 84.47 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15,210.00 77.33 85.09 72.80 =============== 206-00520 Filter Matl (CL B) Cubic Yard ============================================= NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 63.00 80.00 132.80 144.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 30.00 55.00 120.47 128.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 93.00 71.94 127.47 138.84 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 93.00 71.94 127.47 138.84 =============== 206-00530 Filter Matl (CL C) Cubic Yard ============================================= SFTY2254-091 225 Ramp Improvements 04/09/20 96.00 150.00 152.50 165.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 96.00 150.00 152.50 165.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 96.00 95.00 133.90 93.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 96.00 95.00 133.90 93.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 192.00 122.50 139.21 129.00 =============== 206-01000 Bed Course Matl Cubic Yard ============================================= NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 11.00 50.00 208.12 47.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 11.00 50.00 208.12 47.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 50.00 208.12 47.35 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 94 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-01750 Shoring LUMP SUM =============================================== STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 1.00 15000.00 16033.33 24200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 15000.00 16033.33 24200.00 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 1.00 23000.00 34750.00 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 23000.00 34750.00 2500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 19000.00 23520.00 13350.00 =============== 206-01781 Shoring (A 1) LUMP SUM =============================================== BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 1.00 20000.00 42083.33 25000.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 20000.00 42083.33 25000.00 IM0761-226 I76/SH52 Interchange 04/02/20 1.00 16000.00 16323.53 14499.70 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1.00 26000.00 22978.46 22978.46 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 21000.00 17155.40 18739.08 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 1.00 55000.00 106334.22 135000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 55000.00 106334.22 135000.00 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 1.00 30000.00 29141.00 87065.00 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 1.00 4000.00 33325.00 37000.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1.00 17850.00 17850.00 17850.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 1.00 170000.00 146875.00 191700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 55462.50 73631.56 83403.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 42356.25 62491.56 66386.65 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 95 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-01782 Shoring (A 2) LUMP SUM =============================================== BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 1.00 20000.00 46416.67 28000.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 20000.00 46416.67 28000.00 IM0761-226 I76/SH52 Interchange 04/02/20 1.00 16000.00 15689.24 14499.70 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1.00 26000.00 22978.46 22978.46 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 21000.00 16600.40 18739.08 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 1.00 10000.00 54872.48 55000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 10000.00 54872.48 55000.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1.00 17850.00 17850.00 17850.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 1.00 150000.00 103650.00 34350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 83925.00 91392.86 26100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 39975.00 51255.73 28779.69 =============== 206-01783 Shoring (A 3) LUMP SUM =============================================== IM0761-226 I76/SH52 Interchange 04/02/20 1.00 6000.00 10991.43 6200.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1.00 22000.00 19348.96 19348.96 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 14000.00 12036.12 12774.48 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1.00 17850.00 17850.00 17850.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 17850.00 17850.00 17850.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 15283.33 12682.11 14466.32 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 96 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-01784 Shoring (A 4) LUMP SUM =============================================== FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1.00 17850.00 17850.00 17850.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 17850.00 17850.00 17850.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 17850.00 17850.00 17850.00 =============== 206-01786 Shoring (A 6) LUMP SUM =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 41066.39 65410.73 65410.73 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 41066.39 65410.73 65410.73 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 41066.39 65410.73 65410.73 =============== 206-01787 Shoring (A 7) LUMP SUM =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 41066.39 72633.23 72633.23 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 41066.39 72633.23 72633.23 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 41066.39 72633.23 72633.23 =============== 206-01788 Shoring (A 8) LUMP SUM =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 31940.54 13081.12 13081.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 31940.54 13081.12 13081.12 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 31940.54 13081.12 13081.12 =============== 206-01789 Shoring (A 9) LUMP SUM =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 31940.54 13081.12 13081.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 31940.54 13081.12 13081.12 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 31940.54 13081.12 13081.12 =============== 206-01790 Shoring (A 10) LUMP SUM =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 25192.26 34638.78 34638.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 25192.26 34638.78 34638.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 25192.26 34638.78 34638.78 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 97 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-01791 Shoring (A 11) LUMP SUM =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 25000.00 8322.76 8322.76 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 25000.00 8322.76 8322.76 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 25000.00 8322.76 8322.76 =============== 206-01792 Shoring (A 12) LUMP SUM =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 25192.26 34638.78 34638.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 25192.26 34638.78 34638.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 25192.26 34638.78 34638.78 =============== 206-01793 Shoring (A 13) LUMP SUM =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 25000.00 8322.76 8322.76 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 25000.00 8322.76 8322.76 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 25000.00 8322.76 8322.76 =============== 206-01794 Shoring (A 14) LUMP SUM =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 25192.26 34638.78 34638.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 25192.26 34638.78 34638.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 25192.26 34638.78 34638.78 =============== 206-01795 Shoring (A 15) LUMP SUM =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 25000.00 8322.76 8322.76 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 25000.00 8322.76 8322.76 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 25000.00 8322.76 8322.76 =============== 206-01796 Shoring (A 16) LUMP SUM =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 25192.26 34638.78 34638.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 25192.26 34638.78 34638.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 25192.26 34638.78 34638.78 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 98 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-01797 Shoring (A 17) LUMP SUM =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 25000.00 8322.76 8322.76 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 25000.00 8322.76 8322.76 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 25000.00 8322.76 8322.76 =============== 206-01798 Shoring (A 18) LUMP SUM =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 18251.73 29435.99 29435.99 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 18251.73 29435.99 29435.99 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 18251.73 29435.99 29435.99 =============== 206-01799 Shoring (A 19) LUMP SUM =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 18251.73 29435.99 29435.99 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 18251.73 29435.99 29435.99 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 18251.73 29435.99 29435.99 =============== 206-01800 Shoring (A 20) LUMP SUM =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 25839.80 14632.85 14632.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 25839.80 14632.85 14632.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 25839.80 14632.85 14632.85 =============== 206-01801 Shoring (A 21) LUMP SUM =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 35236.12 40463.47 40463.47 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 35236.12 40463.47 40463.47 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 35236.12 40463.47 40463.47 =============== 207-00205 Topsoil Cubic Yard ============================================= FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 1,612.00 17.00 20.00 20.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 99 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 207-00205 Topsoil Cubic Yard ============================================= BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 905.00 15.00 14.29 8.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC PWQM240-172 El Paso County, north Colorad 01/23/20 3,765.00 20.00 54.50 62.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 135.00 92.00 47.67 33.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 2,243.00 40.00 52.18 59.48 STR0101-027 SH 10 Overlay La Junta West 02/27/20 160.00 25.00 48.06 52.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 61,063.00 25.00 25.32 18.70 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 46.00 150.00 140.00 140.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 3,058.00 5.00 9.07 8.35 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 731.00 13.00 18.41 8.97 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 3,120.00 10.00 43.33 12.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 13,982.00 8.00 27.62 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 90,820.00 21.18 27.07 20.49 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 451.00 30.00 28.67 45.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 1,838.00 10.00 15.00 12.50 SFTY2254-091 225 Ramp Improvements 04/09/20 915.00 25.00 51.50 51.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 835.00 15.00 31.39 15.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 50.00 12.00 91.33 126.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 10.00 50.00 262.33 640.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 3,150.00 12.00 7.15 4.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 13,750.00 8.20 8.55 8.55 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 15,060.00 10.00 15.31 10.00 NH050A-037 US 50A Pueblo Regional Pond -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 36,059.00 10.25 14.80 10.98 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 832.00 13.00 14.56 20.78 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 52.00 53.00 54.67 110.00 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 98.00 20.00 77.00 55.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 296.00 25.00 51.50 55.00 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 497.00 30.00 25.00 25.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 1,752.00 22.41 9.64 6.40 STM094A-038 SH94 WB PASSING LANE 09/01/20 2,445.00 24.56 24.56 24.56 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1,842.00 17.00 15.05 8.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 6,644.00 5.00 7.38 5.90 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 2,367.00 5.00 12.71 2.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 16,825.00 12.69 11.20 11.19 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 446.00 18.00 25.59 34.15 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 100 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 207-00205 Topsoil Cubic Yard ============================================= NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 200.00 45.00 149.00 142.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 519.00 90.00 124.33 140.00 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 1,000.00 15.00 46.44 42.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 4,952.00 7.04 7.04 7.04 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 32,130.00 5.00 4.53 3.45 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 138,488.00 6.58 6.79 6.79 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 177,735.00 6.67 6.89 7.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 321,439.00 11.49 15.92 11.48 =============== 207-00210 Stockpile Topsoil Cubic Yard ============================================= FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 560.00 6.00 23.13 22.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 1,612.00 8.00 15.00 15.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 905.00 8.00 10.24 5.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 573.00 6.00 9.35 7.31 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,650.00 7.38 12.26 12.39 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 451.00 7.50 19.33 28.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 835.00 10.00 7.81 2.55 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 3,150.00 7.00 5.08 3.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 19,835.00 5.70 5.97 5.97 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 24,271.00 6.05 6.12 5.88 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 832.00 7.00 10.64 14.40 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 497.00 30.00 24.00 24.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 1,752.00 10.58 6.31 5.30 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1,816.00 12.00 8.64 2.50 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 2,218.00 4.00 9.21 1.70 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 20,980.00 9.00 9.11 9.11 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 28,095.00 9.21 8.69 8.28 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 446.00 10.00 23.06 31.40 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 101 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 207-00210 Stockpile Topsoil Cubic Yard ============================================= NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 405.00 30.00 41.30 25.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 4,952.00 5.78 5.78 5.78 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 32,000.00 7.00 3.55 3.10 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 138,488.00 2.84 5.48 5.48 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 176,291.00 3.76 4.63 5.17 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 232,307.00 4.71 5.60 5.73 =============== 207-00305 Wetland Topsoil Cubic Yard ============================================= BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 55.00 30.00 28.81 20.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 55.00 30.00 28.81 20.00 IM0761-226 I76/SH52 Interchange 04/02/20 820.00 18.00 15.46 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 820.00 18.00 15.46 11.00 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 3.00 40.00 100.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 40.00 100.00 100.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 52.00 65.00 88.25 45.50 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1,130.00 20.56 16.35 16.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,182.00 22.52 31.91 17.63 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,060.00 20.94 19.24 15.18 =============== 207-00310 Stockpile Wetland Topsoil Cubic Yard ============================================= BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 55.00 20.00 23.74 16.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 55.00 20.00 23.74 16.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 102 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 207-00310 Stockpile Wetland Topsoil Cubic Yard ============================================= IM0761-226 I76/SH52 Interchange 04/02/20 820.00 19.00 14.96 11.99 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 820.00 19.00 14.96 11.99 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 3.00 50.00 100.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 50.00 100.00 100.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1,130.00 17.01 13.46 13.46 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,130.00 17.01 13.46 13.46 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,008.00 17.95 15.16 13.06 =============== 207-00405 Topsoil (Spec) Cubic Yard ============================================= FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 79.00 107.14 107.14 107.14 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 79.00 107.14 107.14 107.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 79.00 107.14 107.14 107.14 =============== 207-00700 Topsoil (Onsite) Cubic Yard ============================================= SHE 0703-461 I-70 and Kipling North Phase 03/26/20 303.00 28.00 33.00 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 303.00 28.00 33.00 21.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 1,220.00 10.00 17.35 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,220.00 10.00 17.35 10.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 103 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 207-00700 Topsoil (Onsite) Cubic Yard ============================================= SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 646.00 12.50 50.00 85.00 STR184B-006 CULVERTS SH 184 08/06/20 121.00 25.00 46.50 46.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 767.00 14.47 49.70 78.93 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,290.00 13.88 22.34 34.54 =============== 207-00702 Topsoil (Offsite) Cubic Yard ============================================= C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 206.00 50.00 82.50 115.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 206.00 50.00 82.50 115.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 206.00 50.00 82.50 115.00 =============== 207-00703 Topsoil (Wetlnd) Cubic Yard ============================================= FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 201.00 20.00 28.27 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 201.00 20.00 28.27 20.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 201.00 20.00 28.27 20.00 =============== 207-00704 Sub Soil Prep Sq Yard ================================================ SHE 0703-461 I-70 and Kipling North Phase 03/26/20 2,015.00 1.00 5.44 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,015.00 1.00 5.44 7.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 7,930.00 1.00 2.05 0.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7,930.00 1.00 2.05 0.30 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 1,222.00 7.00 9.06 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,222.00 7.00 9.06 6.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,167.00 1.66 2.84 2.13 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 104 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00002 Erosion Log Type 1 (12 In) Lin Foot =============================================== STA0142-066 SH 14 New Raymer West 01/09/20 100.00 5.00 5.63 6.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 800.00 5.00 9.00 9.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 10,041.00 6.00 6.60 5.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 1,913.00 6.00 6.07 6.50 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STA006A-067 SH 6 Merino to Atwood 01/16/20 300.00 5.00 10.36 11.75 STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 200.00 6.00 5.00 4.75 PWQM240-172 El Paso County, north Colorad 01/23/20 3,697.00 6.00 5.50 6.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 100.00 6.00 13.50 5.00 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 15,510.00 7.00 5.50 5.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 800.00 7.00 5.50 5.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 2,500.00 5.00 4.80 6.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 1,200.00 8.00 6.54 6.75 STR0101-027 SH 10 Overlay La Junta West 02/27/20 2,000.00 5.00 4.61 5.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 2,742.00 5.00 6.96 4.50 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 200.00 5.00 7.50 5.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 1,025.00 5.00 4.79 4.13 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 450.00 6.00 4.83 5.25 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 560.00 6.00 4.50 4.50 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 4,000.00 4.50 4.46 3.65 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 2,150.00 7.00 6.95 5.50 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 57,920.00 5.00 5.39 4.30 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1,760.00 5.00 5.48 5.25 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 510.00 5.50 6.40 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 110,478.00 5.50 5.48 4.74 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 200.00 5.00 6.21 4.93 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 1,000.00 5.00 5.98 6.85 IM0761-226 I76/SH52 Interchange 04/02/20 11,860.00 6.00 4.95 3.91 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 3,380.00 4.50 4.72 4.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 500.00 10.00 10.24 17.50 NHPP1601-077 US 160 MP 29.750 - MP 34.891 04/09/20 200.00 5.00 8.12 5.00 SFTY2254-091 225 Ramp Improvements 04/09/20 3,903.00 5.00 5.00 4.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 15,980.00 5.50 4.94 3.72 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 80.00 6.00 10.23 7.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 86.00 10.00 8.75 11.75 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 1,310.00 6.00 6.00 5.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 1,634.00 5.00 4.57 4.25 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 1,655.00 8.00 7.12 6.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 3,500.00 6.00 4.84 4.75 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 14,600.00 7.00 7.13 7.47 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 105 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00002 Erosion Log Type 1 (12 In) Lin Foot =============================================== NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 27,340.00 4.30 4.32 4.32 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 5,130.00 5.50 5.56 5.25 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 1,000.00 5.00 4.00 2.50 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 80.00 5.00 10.33 7.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 250.00 8.00 7.00 5.01 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 93,688.00 5.47 5.32 4.83 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 600.00 5.00 6.93 7.00 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 1,700.00 5.00 5.81 4.90 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 1,180.00 5.00 4.52 3.68 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 36.00 8.00 5.13 4.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 120.00 8.00 4.88 4.50 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 1,555.00 4.75 5.00 6.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 80.00 6.00 8.00 7.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 5,150.00 3.45 3.45 3.45 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 750.00 7.00 5.03 4.00 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 400.00 10.00 6.65 12.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 17,100.00 5.00 5.20 5.65 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 100.00 6.00 16.13 4.40 CR400-374 FY 20 Culvert Prioritization 09/17/20 1,500.00 6.00 4.65 4.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 23,085.00 4.05 4.32 4.32 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 53,356.00 4.54 5.08 4.79 MPC040-061 R2 FY 21 Sign Replacement 10/01/20 250.00 5.96 6.00 2.00 MTCE0253-271 FY20 I-25 SIGN REPL PHASE 1 10/08/20 250.00 5.00 6.47 5.00 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 490.00 5.00 10.02 3.65 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 7,300.00 6.00 7.47 5.31 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 1,000.00 8.00 5.03 4.90 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 17,000.00 4.00 5.49 4.50 NHPP0702-407 PR I-70 Glenwood Springs Griz 11/03/20 200.00 7.00 11.34 8.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 1,750.00 6.00 4.95 4.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 500.00 10.00 5.31 4.60 C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 200.00 7.00 7.58 6.00 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 1,000.00 5.00 6.58 7.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 100.00 8.00 7.41 6.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 700.00 6.00 5.21 5.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 200.00 7.00 6.74 4.75 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 480.00 8.00 5.80 5.31 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 639.00 5.00 6.75 8.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 50.00 5.30 5.30 5.30 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 106 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00002 Erosion Log Type 1 (12 In) Lin Foot =============================================== NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 13,000.00 4.00 4.34 4.20 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 118,905.00 4.69 5.02 5.02 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 164,014.00 4.70 5.26 4.92 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 421,536.00 5.06 5.35 4.84 =============== 208-00004 Silt Berm Lin Foot =============================================== FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 150.00 19.82 19.82 19.82 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 150.00 19.82 19.82 19.82 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 150.00 19.82 19.82 19.82 =============== 208-00007 Erosion Log Type 2 (8 In) Lin Foot =============================================== NH050A-035 US 50A Pueblo Regional Pond 05/28/20 16,600.00 6.20 4.48 3.70 NH050A-037 US 50A Pueblo Regional Pond -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16,600.00 6.20 4.48 3.70 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 3,440.00 4.69 4.95 3.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,440.00 4.69 4.95 3.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20,040.00 5.94 4.56 3.67 =============== 208-00008 Erosion Log Type 2 (12 In) Lin Foot =============================================== NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 350.00 10.00 8.35 10.00 STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 950.00 5.00 8.00 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,300.00 6.35 8.18 8.54 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 116.00 8.00 7.00 7.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 107 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00008 Erosion Log Type 2 (12 In) Lin Foot =============================================== STR184B-006 CULVERTS SH 184 08/06/20 625.00 7.00 7.75 7.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 741.00 7.16 7.63 7.63 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,041.00 6.64 8.03 8.21 =============== 208-00009 Erosion Log Type 2 (18 In) Lin Foot =============================================== STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 280.00 12.00 14.00 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 280.00 12.00 14.00 14.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 280.00 12.00 14.00 14.00 =============== 208-00011 Erosion Bales (Weed Free) Each =================================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 160.00 26.00 33.14 31.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 160.00 26.00 33.14 31.00 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 24.00 25.00 24.50 25.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 245.00 25.00 22.88 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 269.00 25.00 23.02 25.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 50.00 30.53 30.53 30.53 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 50.00 30.53 30.53 30.53 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 479.00 25.91 30.16 27.58 =============== 208-00012 Erosion Log Type 1 (9 In) Lin Foot =============================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 200.00 7.00 8.31 12.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 3,165.00 5.00 4.72 4.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,365.00 5.12 4.85 4.95 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 108 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00012 Erosion Log Type 1 (9 In) Lin Foot =============================================== STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 400.00 6.50 4.17 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 400.00 6.50 4.17 4.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 2,980.00 4.00 8.50 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,980.00 4.00 8.50 7.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,745.00 4.71 5.74 5.80 =============== 208-00013 Erosion Log Type 1 (20 In) Lin Foot =============================================== STR2871-038 US 287 Passing Lanes Springfi 03/05/20 2,000.00 10.00 6.46 7.28 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,000.00 10.00 6.46 7.28 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1,840.00 7.00 8.82 7.92 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 500.00 7.00 10.70 10.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,340.00 7.00 8.88 8.51 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 3,000.00 10.00 7.00 6.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,000.00 10.00 7.00 6.75 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 110.00 6.91 6.91 6.91 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 1,000.00 7.00 7.54 6.35 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1,000.00 6.65 7.12 7.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,110.00 6.83 7.47 6.74 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,450.00 8.55 7.67 7.30 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 109 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00020 Silt Fence Lin Foot =============================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 100.00 2.00 8.63 7.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 100.00 3.25 3.00 3.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 4,591.00 1.50 2.71 1.50 PWQM240-172 El Paso County, north Colorad 01/23/20 232.00 4.00 2.00 2.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 13,472.00 2.00 2.10 2.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 1,560.00 3.25 2.47 3.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 1,000.00 2.00 1.94 1.38 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 710.00 4.00 2.15 2.15 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 18,259.00 3.00 2.23 1.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 40,024.00 2.50 2.23 1.71 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 200.00 2.00 2.69 2.08 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 5,500.00 2.25 2.05 1.10 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 390.00 1.00 1.47 1.47 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 2,300.00 2.00 2.29 1.40 NH050A-037 US 50A Pueblo Regional Pond -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8,390.00 2.12 2.12 1.22 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 358.00 3.00 2.80 3.00 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 1,204.00 2.00 3.00 3.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 1,625.00 2.00 3.25 4.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 150.00 5.00 2.85 3.55 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 4,400.00 3.23 2.07 1.50 STM094A-038 SH94 WB PASSING LANE 09/01/20 2,130.00 1.20 1.20 1.20 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 3,320.00 3.00 2.95 5.05 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1,440.00 1.15 1.47 1.47 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 14,627.00 2.45 2.42 2.72 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 5,595.00 3.00 6.64 2.44 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 500.00 4.00 3.06 5.00 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 1,000.00 1.50 1.80 1.81 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 200.00 4.00 2.92 2.44 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 200.00 1.07 1.07 1.07 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 110 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00020 Silt Fence Lin Foot =============================================== NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 29,555.00 1.03 1.10 1.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 37,050.00 1.40 3.02 1.38 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 100,091.00 2.05 2.34 1.69 =============== 208-00021 Silt Fence (Reinf) Lin Foot =============================================== NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 1,500.00 5.00 3.95 2.89 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,500.00 5.00 3.95 2.89 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 208.00 3.00 8.00 10.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 930.00 3.00 2.94 2.94 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,138.00 3.00 4.50 4.23 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1,400.00 3.00 4.98 3.50 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 300.00 5.00 5.63 7.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,700.00 3.35 5.08 4.26 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 8,200.00 3.14 3.14 3.14 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 500.00 3.08 3.30 3.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8,700.00 3.13 3.14 3.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13,038.00 3.36 4.23 3.36 =============== 208-00023 Erosion Log (Type 3)(12 In) Lin Foot =============================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 1,350.00 6.00 8.08 6.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 1,719.00 6.50 7.06 8.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,069.00 6.28 7.35 7.12 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 111 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00023 Erosion Log (Type 3)(12 In) Lin Foot =============================================== IM025A-048 Northbound I-25 bridge at Exi 05/28/20 60.00 7.00 15.30 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 60.00 7.00 15.30 18.00 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 1,500.00 6.00 5.92 6.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,500.00 6.00 5.92 6.70 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,629.00 6.20 7.09 7.13 =============== 208-00024 Erosion Log (Type 3)(20 In) Lin Foot =============================================== BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 930.00 10.00 9.54 5.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 930.00 10.00 9.54 5.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 930.00 10.00 9.54 5.25 =============== 208-00025 Plastic Sheeting Sq Yard ================================================ FSA2873-194 US 287 Longmont Intersection 02/13/20 1,200.00 10.00 3.25 2.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,200.00 10.00 3.25 2.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,200.00 10.00 3.25 2.50 =============== 208-00033 Sediment Trap Each =================================================== NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 1.00 2000.00 3875.27 5250.53 PWQM240-172 El Paso County, north Colorad 01/23/20 1.00 3000.00 7255.00 8110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 2500.00 5565.13 6680.27 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1.00 10000.00 10898.88 10898.88 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 10000.00 10898.88 10898.88 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 112 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00033 Sediment Trap Each =================================================== FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 4.00 4095.00 4095.00 4095.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 4095.00 4095.00 4095.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 4482.86 5504.38 5805.63 =============== 208-00035 Aggregate Bag Lin Foot =============================================== STA0142-066 SH 14 New Raymer West 01/09/20 800.00 23.00 7.50 6.00 FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 25.00 12.00 18.51 22.00 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 120.00 10.00 12.32 11.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 120.00 10.00 13.00 13.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 3,040.00 5.00 7.48 6.50 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 120.00 6.50 11.14 8.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STA006A-067 SH 6 Merino to Atwood 01/16/20 500.00 23.00 9.85 8.50 STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 200.00 8.00 8.50 11.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 1,500.00 6.00 6.97 6.93 PWQM240-172 El Paso County, north Colorad 01/23/20 1,080.00 12.00 6.50 5.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 100.00 12.00 15.00 12.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 65.00 12.00 30.75 16.50 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 500.00 8.00 8.35 7.20 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 700.00 8.00 9.00 8.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 400.00 10.00 9.89 6.60 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 8.00 8.00 11.84 12.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 100.00 10.00 19.95 11.50 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 200.00 10.00 10.50 11.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 210.00 10.00 16.96 34.25 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 100.00 10.00 9.60 8.00 NHPP0502-082 US 50 MONTROSE RE CHIP SEAL 03/05/20 1,000.00 10.00 7.94 5.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 212.00 10.00 8.45 7.50 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 25,200.00 8.00 6.63 5.80 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 425.00 10.00 6.90 6.75 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 100.00 12.00 9.40 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 36,825.00 8.50 6.90 6.33 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 200.00 9.00 11.99 12.77 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 500.00 10.00 10.80 8.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 113 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00035 Aggregate Bag Lin Foot =============================================== IM0761-226 I76/SH52 Interchange 04/02/20 384.00 10.00 9.86 6.36 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 100.00 9.00 18.57 20.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 500.00 15.00 12.81 17.50 SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 1,000.00 12.00 5.00 5.00 C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 200.00 6.00 12.60 14.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 1,220.00 10.00 13.00 12.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 40.00 10.00 15.00 12.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 145.00 10.00 12.67 15.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 1,500.00 8.00 7.33 8.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 200.00 20.00 10.73 10.24 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 100.00 5.00 14.67 24.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 100.00 11.00 10.86 10.86 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 635.00 12.00 7.82 0.10 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 800.00 10.00 8.58 8.00 NH050A-037 US 50A Pueblo Regional Pond ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 220.00 14.00 9.75 7.50 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 120.00 8.00 8.83 7.50 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 60.00 10.00 11.96 11.78 NHPPR100-251 SH 2/ Vasquez 06/25/20 200.00 10.00 20.28 32.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8,224.00 10.48 9.30 9.59 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 600.00 6.00 9.88 10.00 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 200.00 8.00 11.87 9.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 335.00 8.00 7.00 7.00 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 1,920.00 6.00 6.95 6.50 FSAC010-124 US 40, US 287, SH 88 08/06/20 175.00 12.00 12.33 14.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 1,530.00 7.00 11.14 6.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 350.00 5.24 5.24 5.24 MTCE0702-386 Grand Junction 09/03/20 100.00 20.00 7.00 11.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 40.00 12.00 11.51 12.00 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 400.00 15.00 12.95 12.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 200.00 10.00 8.01 8.50 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 125.00 14.00 12.53 11.70 SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 1,500.00 12.00 6.25 7.50 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 60.00 2.00 25.46 9.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 200.00 6.40 8.69 8.69 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7,735.00 8.49 9.37 7.65 MTCE0253-271 FY20 I-25 SIGN REPL PHASE 1 10/08/20 50.00 10.00 11.67 5.00 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 9,300.00 8.00 9.27 5.31 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 114 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00035 Aggregate Bag Lin Foot =============================================== NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 1,000.00 15.00 6.58 5.25 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 1,200.00 8.00 7.11 8.75 NHPP0702-407 PR I-70 Glenwood Springs Griz 11/03/20 500.00 12.00 9.80 10.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 2,865.00 10.00 6.73 6.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 500.00 15.00 6.09 5.22 C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 750.00 12.00 5.62 5.50 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 500.00 7.00 9.00 9.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 100.00 8.00 10.63 9.00 FSA1211-098 SH 121 & 1ST AVE 11/19/20 150.00 8.00 9.00 10.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 3,120.00 6.00 10.25 8.50 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 150.00 8.50 10.09 10.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 100.00 10.00 7.78 5.25 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 200.00 8.00 7.03 7.97 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 200.00 12.00 10.01 8.29 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 108.00 8.00 13.50 11.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1,000.00 5.23 5.23 5.23 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 200.00 7.00 9.23 5.25 STA141A-051 This will be a chipseal proje 12/17/20 1,000.00 8.00 9.54 15.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 2,450.00 4.07 4.35 4.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 25,443.00 8.12 8.31 6.53 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 78,227.00 8.58 7.63 6.87 =============== 208-00036 Aggregate Bag (Special) Lin Foot =============================================== FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 200.00 6.16 6.16 6.16 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 200.00 6.16 6.16 6.16 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 200.00 6.16 6.16 6.16 =============== 208-00041 Rock Check Dam Each =================================================== PWQM240-172 El Paso County, north Colorad 01/23/20 13.00 700.00 2541.00 2482.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 13.00 700.00 2541.00 2482.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 71.00 700.00 992.77 440.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 50.00 540.00 609.05 609.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 121.00 633.88 961.73 509.86 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 115 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00041 Rock Check Dam Each =================================================== NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 2.00 1000.00 1171.06 1225.23 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 4.00 500.00 800.00 500.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 2.00 897.79 1521.76 530.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 724.45 1244.47 688.81 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 4.00 777.00 777.00 777.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 101.00 101.88 584.50 584.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 105.00 127.60 591.83 591.83 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 247.00 425.07 977.53 654.30 =============== 208-00045 Conc Washout Str Each =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 1.00 1500.00 4000.00 4000.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 6.00 1500.00 2204.98 2384.00 PWQM240-172 El Paso County, north Colorad 01/23/20 14.00 3000.00 898.50 817.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 2.00 2000.00 2824.20 2721.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 1.00 3000.00 2562.97 2500.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 2.00 1970.00 2360.65 2500.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 2.00 2000.00 1280.51 2340.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 2.00 1500.00 1632.32 698.62 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 2.00 2500.00 4619.03 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 32.00 2357.50 2204.63 1680.04 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 1.00 800.00 1358.80 541.43 IM0761-226 I76/SH52 Interchange 04/02/20 3.00 1500.00 5367.23 2915.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 4.00 1500.00 2562.50 1125.00 SFTY2254-091 225 Ramp Improvements 04/09/20 3.00 1500.00 3282.50 1665.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 6.00 2500.00 2732.18 550.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 3.00 2040.00 1290.00 685.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 3.00 2597.00 1612.52 1612.52 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 8.00 1500.00 833.50 500.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 116 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00045 Conc Washout Str Each =================================================== NH050A-037 US 50A Pueblo Regional Pond SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 1.00 2000.00 1320.60 223.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 32.00 1834.72 2182.77 1037.41 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 1.00 1900.00 2256.39 1488.32 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 3.00 2500.00 925.00 750.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 4.00 2000.00 865.00 750.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 4.00 1791.35 1435.73 1000.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1.00 2500.00 2136.97 650.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 2.00 2000.00 2844.48 3230.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 1.00 2200.00 2902.47 4000.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 2.00 800.00 1860.67 200.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 8.00 2666.34 1846.08 1846.08 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 26.00 2161.39 1818.42 1423.73 MPC040-061 R2 FY 21 Sign Replacement 10/01/20 1.00 1591.35 1350.00 1200.00 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 5.00 2000.00 1393.75 2100.00 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 1.00 2500.00 1644.31 1600.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 7.00 2500.00 1285.00 575.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 15.00 1316.71 1297.76 1297.76 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 29.00 1770.41 1351.19 1268.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 119.00 2031.00 1997.67 1350.98 =============== 208-00046 Pre-fab Conc Washout Str (Type 1) Each =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 1.00 2500.00 2676.38 3200.00 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 2.00 640.00 1186.67 710.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 3.00 1810.00 1795.49 1180.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 1.00 2000.00 4125.27 5250.53 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 1.00 2500.00 9000.00 5000.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 2.00 2000.00 2898.35 2596.70 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 4.00 1750.00 535.05 400.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 2.00 1600.00 2025.00 2050.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 10.00 1500.00 808.33 600.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 2.00 2000.00 1750.00 500.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 117 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00046 Pre-fab Conc Washout Str (Type 1) Each =================================================== NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 1.00 2000.00 200.00 200.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1.00 1000.00 13146.67 10000.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 2.00 3000.00 2432.50 2885.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 2.00 2500.00 1348.00 1450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 34.00 1791.47 1577.75 1622.76 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 2.00 2000.00 1008.33 1200.00 SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 3.00 2500.00 1800.00 1800.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 2.00 2200.00 2685.30 3300.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1601-082 Hawkins Signal and Curb Ramps 04/30/20 3.00 1500.00 666.67 400.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 2.00 1600.00 3377.33 207.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 4.00 2000.00 611.67 685.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 34.00 500.00 259.75 91.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 2.00 8000.00 4963.60 4963.60 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 2.00 500.00 982.20 350.00 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 9.00 750.00 250.00 250.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 2.00 2200.00 595.00 725.00 NHPPR100-251 SH 2/ Vasquez 06/25/20 4.00 1500.00 1398.55 1256.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 69.00 1199.28 699.79 597.10 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 2.00 1600.00 1381.67 200.00 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 2.00 1613.00 2266.67 600.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 3.00 1625.00 1072.50 1145.00 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 1.00 1000.00 2632.60 1600.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 3.00 2000.00 1271.67 710.00 STR184B-006 CULVERTS SH 184 08/06/20 1.00 600.00 3000.00 3000.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 2.00 500.00 4478.57 2000.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 2.00 2000.00 3154.13 2370.63 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1.00 2500.00 2309.57 5000.00 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 1.00 1500.00 2173.60 3418.00 SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 3.00 2000.00 1250.00 500.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 8.00 4204.00 4593.26 4593.26 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 29.00 2328.72 2581.41 2316.22 MTCE0253-271 FY20 I-25 SIGN REPL PHASE 1 10/08/20 1.00 2000.00 2500.00 2500.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 118 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00046 Pre-fab Conc Washout Str (Type 1) Each =================================================== CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 6.00 2000.00 1082.20 800.00 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 1.00 3000.00 1245.00 235.00 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 4.00 3000.00 1327.67 478.00 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 4.00 1820.00 1365.67 250.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 3.00 2000.00 1571.67 165.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 1.00 1200.00 2035.50 1725.00 C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 1.00 2000.00 3311.22 2000.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 1.00 1500.00 1594.75 1254.00 FSA1211-098 SH 121 & 1ST AVE 11/19/20 1.00 2300.00 526.67 930.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 2.00 1900.00 2685.50 3121.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 1.00 2000.00 2331.64 5720.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 6.00 4800.87 4800.87 4800.87 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 2.00 2000.00 4046.67 3110.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 8.00 4204.00 4858.50 4858.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 42.00 2893.27 2105.41 2445.39 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 174.00 1912.13 1501.47 1530.17 =============== 208-00051 Storm Drain Inlet Protection (Type I) Lin Foot =============================================== BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 9.00 20.00 26.80 15.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC PWQM240-172 El Paso County, north Colorad 01/23/20 18.00 20.00 6.50 5.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 65.00 20.00 31.22 17.44 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 159.00 25.00 9.63 10.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 49.00 15.00 21.68 6.75 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 78.00 15.00 17.80 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 378.00 20.42 16.37 10.74 IM0761-226 I76/SH52 Interchange 04/02/20 197.00 18.00 12.45 6.68 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1,584.00 19.00 12.44 11.77 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 7.00 25.00 48.00 14.00 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 325.00 25.00 27.79 0.10 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 40.00 20.00 17.00 8.50 NH050A-037 US 50A Pueblo Regional Pond SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 160.00 35.00 11.84 10.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,313.00 20.90 14.02 9.54 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 100.00 20.00 15.28 28.05 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 119 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00051 Storm Drain Inlet Protection (Type I) Lin Foot =============================================== SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 155.00 10.00 11.50 15.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 60.00 12.50 23.79 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 315.00 13.65 15.61 18.38 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 60.00 25.00 7.98 9.75 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 430.00 4.38 4.69 4.69 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 490.00 6.90 5.66 5.31 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,496.00 18.23 13.99 9.87 =============== 208-00052 Storm Drain Inlet Protection (Type II) Lin Foot =============================================== C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 10.00 70.00 25.00 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 70.00 25.00 35.00 IM0761-226 I76/SH52 Interchange 04/02/20 10.00 330.00 96.57 117.66 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 10.00 50.00 67.33 39.00 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 325.00 65.00 48.34 0.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 345.00 72.25 50.63 4.64 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 100.00 20.00 88.43 69.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 100.00 20.00 88.43 69.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 455.00 60.71 60.08 19.45 =============== 208-00053 Storm Drain Inlet Protect (Ty I)(84 In) Each =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 15.00 208.00 200.00 200.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 3.00 200.00 425.00 200.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 1.00 200.00 293.17 124.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 120 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00053 Storm Drain Inlet Protect (Ty I)(84 In) Each =================================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 8.00 180.00 325.55 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 27.00 198.52 309.28 179.41 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 2.00 55.00 231.19 72.00 NH050A-037 US 50A Pueblo Regional Pond FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 1.00 200.00 171.67 190.00 NHPPR100-251 SH 2/ Vasquez 06/25/20 1.00 200.00 1274.15 2355.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 127.50 322.01 672.33 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 3.00 225.00 177.93 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 225.00 177.93 200.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 4.00 100.00 259.00 314.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 4.00 250.00 180.00 315.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8.00 175.00 232.67 314.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 42.00 189.17 281.70 253.55 =============== 208-00054 Storm Drain Inlet Protection (Type II) Each =================================================== NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 69.00 250.00 387.50 300.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 5.00 200.00 267.00 200.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 6.00 300.00 286.67 360.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 6.00 100.00 546.67 210.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 15.00 50.00 369.55 345.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 34.00 250.00 257.00 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 135.00 221.48 323.95 287.37 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 6.00 250.00 276.67 295.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 121 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00054 Storm Drain Inlet Protection (Type II) Each =================================================== FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 3.00 250.00 200.67 177.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 9.00 250.00 251.33 255.67 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 8.00 290.00 228.00 216.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 5.00 300.00 344.67 444.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 10.00 300.00 249.90 141.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 23.00 296.52 261.67 232.96 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 2.00 150.00 321.00 285.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 3.00 290.00 230.00 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 234.00 282.00 294.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 172.00 233.37 308.98 278.63 =============== 208-00055 Rigid Inlet Prot Device Each =================================================== STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 220.00 25.00 79.66 80.06 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 220.00 25.00 79.66 80.06 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 3.00 50.00 367.00 177.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 50.00 367.00 177.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 223.00 25.34 85.41 81.36 =============== 208-00056 Storm Drain Inlet Protection (Type III) Each =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 1.00 400.00 65.00 65.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 3.00 500.00 650.00 300.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 9.00 80.00 354.03 290.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 13.00 201.54 413.50 275.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 122 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00056 Storm Drain Inlet Protection (Type III) Each =================================================== IM0761-226 I76/SH52 Interchange 04/02/20 10.00 350.00 307.02 295.74 SFTY2254-091 225 Ramp Improvements 04/09/20 8.00 300.00 307.50 265.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 6.00 350.00 352.83 352.83 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 5.00 250.00 254.33 200.00 NHPPR100-251 SH 2/ Vasquez 06/25/20 7.00 350.00 405.63 43.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 36.00 325.00 314.23 236.03 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 10.00 300.00 225.02 141.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 75.00 200.19 352.83 352.83 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 85.00 211.93 296.03 327.91 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 15.00 275.00 179.33 215.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 15.00 275.00 179.33 215.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 149.00 244.69 295.68 289.73 =============== 208-00057 Storm Drain Inlet Protect (Ty I)(144 In) Each =================================================== FSA2873-194 US 287 Longmont Intersection 02/13/20 1.00 250.00 384.83 211.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 3.00 300.00 409.34 240.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 287.50 404.44 232.75 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 1.00 300.00 223.33 268.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 300.00 223.33 268.00 FSA1211-098 SH 121 & 1ST AVE 11/19/20 2.00 300.00 300.00 350.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 123 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00057 Storm Drain Inlet Protect (Ty I)(144 In) Each =================================================== NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 4.00 300.00 230.00 385.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 300.00 260.00 373.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 295.45 349.85 312.64 =============== 208-00058 Storm Drain Inlet Protect (Ty I)(204 In) Each =================================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 2.00 430.00 467.67 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 430.00 467.67 300.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 19.00 489.69 523.97 523.97 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 19.00 489.69 523.97 523.97 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21.00 484.01 498.23 502.64 =============== 208-00060 Temporary Slope Drain Lin Foot =============================================== FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 640.00 11.78 11.78 11.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 640.00 11.78 11.78 11.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 640.00 11.78 11.78 11.78 =============== 208-00070 Vehicle Tracking Pad Each =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 2.00 2500.00 3378.95 2600.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 1.00 3000.00 2500.00 2500.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 2.00 2000.00 4019.81 3476.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 2.00 2000.00 2337.69 3675.37 PWQM240-172 El Paso County, north Colorad 01/23/20 14.00 3000.00 3547.00 5294.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 1.00 3000.00 3750.00 2500.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 3.00 2000.00 2840.00 2500.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 2.00 2600.00 1899.97 1200.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 4.00 1500.00 2213.75 3641.26 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 3.00 2500.00 2425.27 1294.25 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1.00 1000.00 6573.33 12000.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 124 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00070 Vehicle Tracking Pad Each =================================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 4.00 2600.00 4703.46 2100.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1.00 3000.00 2415.00 3025.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 40.00 2502.50 3403.31 3759.79 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 1.00 3500.00 2533.11 3954.46 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 4.00 2000.00 2812.50 3125.00 SFTY2254-091 225 Ramp Improvements 04/09/20 2.00 2500.00 4387.50 3775.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 6.00 3000.00 2933.94 2145.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 2.00 2000.00 3438.33 3010.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 4.00 4000.00 3468.06 3468.06 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 5.00 2500.00 2227.25 1000.00 NH050A-037 US 50A Pueblo Regional Pond -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 24.00 2791.67 2761.69 2573.61 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 2.00 2600.00 2827.81 1377.85 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 2.00 3000.00 2700.00 1500.00 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 2.00 3000.00 3530.00 3530.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 4.00 2886.50 2832.02 1500.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 3.00 2770.34 2770.34 2770.34 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1.00 3000.00 3193.05 3500.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 1.00 2500.00 4309.70 3907.70 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 12.00 3394.84 3761.18 3761.18 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 27.00 3085.00 3144.09 2950.69 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 1.00 2000.00 2865.75 1938.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 3.00 2600.00 4000.00 3325.00 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 4.00 2300.00 2434.43 3504.59 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 1.00 2500.00 5596.67 4350.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 30.00 3394.89 3189.88 3189.88 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 39.00 3162.74 3344.01 3230.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 130.00 2874.94 3155.44 3213.88 =============== 208-00071 Maint Aggregate (Veh Track Pad) Cubic Yard ============================================= NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 10.00 50.00 143.33 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 50.00 143.33 200.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 125 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00071 Maint Aggregate (Veh Track Pad) Cubic Yard ============================================= NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 50.00 100.00 64.16 124.57 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 50.00 75.00 114.68 68.26 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 150.00 100.00 111.69 111.69 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 250.00 95.00 103.21 105.58 STM094A-038 SH94 WB PASSING LANE 09/01/20 100.00 56.69 56.69 56.69 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 500.00 80.00 59.49 75.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 450.00 85.45 127.52 127.52 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,050.00 80.12 66.98 95.76 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 74.00 75.00 82.97 85.81 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 2,250.00 85.45 104.66 104.66 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,324.00 85.12 102.71 104.06 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,634.00 84.26 82.97 102.03 =============== 208-00075 Pre-fab Vehicle Track Pad Each =================================================== STA0142-066 SH 14 New Raymer West 01/09/20 1.00 4750.00 2218.25 2800.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 1.00 1800.00 3750.00 3750.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 2.00 3000.00 4647.95 5740.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STA006A-067 SH 6 Merino to Atwood 01/16/20 1.00 2500.00 2750.08 2700.00 STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 9.00 3500.00 900.00 900.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 1.00 2000.00 2650.00 2800.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 2.00 1000.00 5199.97 1000.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 2.00 2000.00 3075.00 2500.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 2.00 5000.00 2633.27 1000.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 4.00 5000.00 8612.75 11700.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 2.00 1500.00 5258.00 2750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 27.00 3242.59 4065.00 3441.85 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 126 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00075 Pre-fab Vehicle Track Pad Each =================================================== IM0761-226 I76/SH52 Interchange 04/02/20 3.00 4000.00 8189.67 1959.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 2.00 2500.00 5133.33 250.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 2.00 1200.00 4833.33 3600.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 2.00 2000.00 7615.63 4200.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 2.00 3000.00 3197.51 3900.00 IM025A-048 Northbound I-25 bridge at Exi 05/28/20 1.00 5475.00 5816.33 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12.00 2906.25 6123.39 2898.08 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 4.00 2121.00 1766.67 1600.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 5.00 3400.00 2207.50 2615.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 4.00 2100.00 6087.86 2830.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 2.00 33060.28 33060.28 33060.28 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 3.00 5000.00 4370.00 4160.00 CR400-374 FY 20 Culvert Prioritization 09/17/20 3.00 3000.00 3000.50 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 21.00 5904.98 4811.24 5352.17 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 6.00 2200.00 2439.00 1450.00 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 5.00 4000.00 3672.07 4316.20 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 2.00 10000.00 9813.33 16740.00 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 3.00 4000.00 5906.83 3333.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 3.00 5000.00 8516.67 5000.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 11.00 2656.15 2656.15 2656.15 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 5.00 15850.96 20042.59 20042.59 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 35.00 5390.64 5314.20 6234.02 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 95.00 4580.02 5079.79 4824.14 =============== 208-00082 Construction Mat Sq Foot ================================================ NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 175.00 100.00 25.00 25.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 200.00 17.00 28.49 24.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 375.00 55.73 28.10 24.55 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 127 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00082 Construction Mat Sq Foot ================================================ CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 6,520.00 3.00 10.58 17.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6,520.00 3.00 10.58 17.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,895.00 5.87 11.39 17.51 =============== 208-00090 Erosion Control (Curb Ramp) Each =================================================== STRR300-249 Grand and Jackson Counties AD 03/05/20 148.00 300.00 361.00 290.00 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 36.00 300.00 172.57 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 184.00 300.00 314.85 272.39 STMM086-083 ADA PUEBLO METRO 07/09/20 198.00 250.00 675.00 650.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 125.00 300.00 216.67 300.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 203.00 500.00 423.25 295.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 123.00 400.00 379.09 295.43 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 649.00 366.26 421.35 404.35 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 147.00 650.00 533.33 350.00 CR100-342 US-6 at Garrison 12/17/20 84.00 350.00 505.00 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 231.00 540.91 518.22 368.18 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,064.00 392.72 428.34 373.68 =============== 208-00103 Removal and Disposal of Sediment (Labor) Hour =================================================== STA0142-066 SH 14 New Raymer West 01/09/20 50.00 45.00 52.75 40.00 FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 16.00 65.00 83.03 60.00 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 8.00 75.00 73.33 70.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 20.00 54.00 75.00 75.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 204.50 50.00 82.36 44.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 128 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00103 Removal and Disposal of Sediment (Labor) Hour =================================================== BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 50.00 55.00 53.41 35.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STA006A-067 SH 6 Merino to Atwood 01/16/20 50.00 45.00 91.00 126.00 STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 40.00 40.00 36.75 38.50 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 40.00 50.00 56.26 52.51 PWQM240-172 El Paso County, north Colorad 01/23/20 16.00 75.00 125.50 219.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 30.00 65.00 62.50 60.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 24.00 70.00 224.49 203.97 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 20.00 50.00 60.60 50.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 40.00 50.00 53.00 46.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 70.00 60.00 88.83 50.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 50.00 52.00 58.50 65.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 16.00 60.00 120.64 60.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 50.00 60.00 40.00 60.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 40.00 50.00 106.23 170.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 80.00 60.00 51.00 50.00 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 30.00 40.00 36.00 37.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 20.00 55.00 54.00 54.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 50.00 50.00 59.25 58.50 NHPP0502-082 US 50 MONTROSE RE CHIP SEAL 03/05/20 20.00 50.00 43.50 35.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 40.00 55.00 57.24 62.71 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 100.00 60.00 51.12 51.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 108.00 60.00 46.75 43.70 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 20.00 65.00 51.00 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,302.50 54.48 67.45 60.96 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 80.00 60.00 60.66 62.37 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 40.00 50.00 30.65 32.50 IM0761-226 I76/SH52 Interchange 04/02/20 60.00 55.00 52.38 53.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 16.00 55.00 32.67 20.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 40.00 70.00 48.00 35.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 60.00 40.00 70.00 100.00 NHPP1601-077 US 160 MP 29.750 - MP 34.891 04/09/20 8.00 50.00 54.67 50.00 SFTY2254-091 225 Ramp Improvements 04/09/20 48.00 65.00 53.50 45.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 300.00 60.00 78.91 110.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 30.00 60.00 73.08 58.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 30.00 50.00 66.67 78.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 10.00 60.00 88.33 96.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 24.00 50.00 47.00 35.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 8.00 70.00 56.67 42.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 216.00 50.00 44.39 25.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 100.00 60.00 54.25 19.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 15.00 50.00 41.67 35.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 129 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00103 Removal and Disposal of Sediment (Labor) Hour =================================================== NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 40.00 60.00 50.99 50.99 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 40.00 70.00 85.96 1.00 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 200.00 50.00 51.35 45.00 NH050A-037 US 50A Pueblo Regional Pond ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 50.00 60.00 42.50 10.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 8.00 100.00 71.67 60.00 NHPPR100-251 SH 2/ Vasquez 06/25/20 10.00 75.00 87.68 113.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,433.00 56.29 59.27 55.82 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 16.00 55.00 160.00 50.00 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 30.00 50.00 48.38 20.00 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 30.00 60.00 56.23 63.45 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 80.00 60.00 90.00 80.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 50.00 75.00 47.50 45.00 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 10.00 100.00 45.00 45.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 50.00 60.00 50.00 65.00 STR184B-006 CULVERTS SH 184 08/06/20 100.00 60.00 55.00 55.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 60.00 70.00 53.71 50.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 80.00 59.45 52.44 52.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 20.00 43.73 43.73 43.73 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 10.00 70.00 112.79 50.00 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 5.00 60.00 77.28 55.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 100.00 50.00 66.80 68.30 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 40.00 50.00 82.55 40.25 CR400-374 FY 20 Culvert Prioritization 09/17/20 24.00 56.00 70.25 35.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 40.00 46.68 53.54 53.54 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 745.00 58.75 64.20 55.55 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 30.00 55.00 49.93 81.35 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 45.00 60.00 70.29 65.87 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 40.00 70.00 48.50 40.50 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 80.00 60.00 77.73 0.10 NHPP0702-407 PR I-70 Glenwood Springs Griz 11/03/20 5.00 60.00 100.20 65.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 20.00 55.00 53.23 48.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 40.00 70.00 54.93 46.25 C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 40.00 60.00 75.13 49.00 ITSITSB-002 ITS CV ROADSIDE UNITS 11/12/20 20.00 60.00 44.67 36.00 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 4.00 50.00 169.75 79.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 10.00 50.00 66.50 75.00 FSA1211-098 SH 121 & 1ST AVE 11/19/20 3.00 65.00 76.00 75.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 130 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00103 Removal and Disposal of Sediment (Labor) Hour =================================================== NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 50.00 60.00 67.00 34.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 30.00 45.00 54.15 60.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 60.00 75.00 68.94 54.00 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 20.00 55.00 64.74 36.62 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 40.00 75.00 102.97 90.31 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 84.00 60.00 90.00 95.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 400.00 53.38 53.38 53.38 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 400.00 40.00 59.33 44.80 STA141A-051 This will be a chipseal proje 12/17/20 20.00 50.00 85.40 165.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 200.00 46.68 52.29 52.29 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,641.00 52.60 63.81 52.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,121.50 55.01 62.74 56.04 =============== 208-00105 Removal and Disposal of Sediment (Equip) Hour =================================================== STA0142-066 SH 14 New Raymer West 01/09/20 50.00 85.00 95.75 80.00 FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 16.00 100.00 235.64 250.00 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 8.00 150.00 132.33 92.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 205.00 100.00 164.67 185.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 100.00 110.00 113.50 105.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STA006A-067 SH 6 Merino to Atwood 01/16/20 50.00 85.00 153.51 195.00 STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 40.00 150.00 88.65 82.30 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 40.00 150.00 96.88 78.76 PWQM240-172 El Paso County, north Colorad 01/23/20 16.00 135.00 392.00 454.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 30.00 110.00 130.00 100.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 12.00 120.00 424.42 358.84 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 20.00 120.00 134.40 85.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 8.00 150.00 107.50 85.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 20.00 130.00 143.00 150.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 50.00 105.00 99.00 120.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 16.00 120.00 222.55 100.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 50.00 150.00 72.50 125.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 40.00 100.00 211.27 340.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 80.00 100.00 111.67 100.01 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 30.00 150.00 90.00 100.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 20.00 150.00 137.00 137.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 50.00 150.00 152.75 175.50 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 40.00 120.00 123.20 117.43 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 100.00 150.00 103.33 130.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 20.00 100.00 130.80 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,111.00 118.24 134.41 147.58 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 80.00 150.00 139.91 148.14 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 131 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00105 Removal and Disposal of Sediment (Equip) Hour =================================================== IM0761-226 I76/SH52 Interchange 04/02/20 60.00 110.00 111.97 212.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 12.00 100.00 96.00 20.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 40.00 150.00 100.01 78.80 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 30.00 100.00 175.00 100.00 SFTY2254-091 225 Ramp Improvements 04/09/20 48.00 150.00 112.50 105.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 150.00 130.00 161.29 275.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 30.00 120.00 131.02 125.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 30.00 125.00 169.67 169.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 10.00 100.00 99.67 56.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 24.00 125.00 109.38 65.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 24.00 125.00 159.67 125.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 20.00 115.00 111.91 90.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 100.00 120.00 101.50 50.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 40.00 130.00 204.98 204.98 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 40.00 120.00 124.17 1.00 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 200.00 50.00 123.81 75.00 NH050A-037 US 50A Pueblo Regional Pond ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 50.00 135.00 42.50 10.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 8.00 150.00 131.67 195.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 996.00 112.55 129.40 123.79 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 30.00 100.00 91.71 20.00 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 30.00 120.00 133.18 106.95 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 80.00 150.00 220.00 215.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 50.00 150.00 112.50 110.00 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 10.00 150.00 120.00 120.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 25.00 150.00 105.00 130.00 STR184B-006 CULVERTS SH 184 08/06/20 40.00 180.00 110.00 110.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 20.00 120.00 140.43 85.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 80.00 127.06 119.54 120.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 40.00 105.92 105.92 105.92 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 10.00 120.00 125.29 120.00 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 5.00 150.00 97.74 65.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 100.00 150.00 112.25 115.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 20.00 110.00 159.10 151.65 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 40.00 183.95 169.35 169.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 580.00 141.14 126.62 127.12 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 30.00 110.00 100.18 130.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 132 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00105 Removal and Disposal of Sediment (Equip) Hour =================================================== NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 45.00 110.00 138.95 166.84 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 20.00 135.00 135.67 147.00 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 80.00 110.00 123.85 0.10 NHPP0702-407 PR I-70 Glenwood Springs Griz 11/03/20 5.00 120.00 218.24 165.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 10.00 150.00 136.00 120.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 40.00 150.00 131.07 130.00 C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 20.00 120.00 141.45 87.00 ITSITSB-002 ITS CV ROADSIDE UNITS 11/12/20 20.00 150.00 52.33 36.00 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 4.00 150.00 208.25 138.00 FSA1211-098 SH 121 & 1ST AVE 11/19/20 4.00 140.00 63.67 28.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 10.00 105.00 150.00 40.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 30.00 110.00 105.50 130.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 60.00 150.00 142.06 42.00 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 20.00 120.00 161.74 154.39 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 40.00 125.00 164.81 191.25 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 84.00 100.00 85.00 120.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 50.00 167.37 167.37 167.37 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 40.00 140.00 120.42 109.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 200.00 183.95 167.63 167.63 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 812.00 140.79 129.46 121.43 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,499.00 125.65 130.23 131.35 =============== 208-00106 Sweeping (Sediment Removal) Hour =================================================== STA0142-066 SH 14 New Raymer West 01/09/20 20.00 135.00 155.75 121.00 FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 12.00 160.00 206.24 130.00 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 6.00 200.00 215.00 170.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 80.00 150.00 120.00 120.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 750.00 125.00 169.21 153.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 100.00 130.00 159.17 90.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STA006A-067 SH 6 Merino to Atwood 01/16/20 20.00 135.00 265.71 285.00 STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 40.00 125.00 165.00 220.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 40.00 150.00 211.27 262.53 PWQM240-172 El Paso County, north Colorad 01/23/20 24.00 175.00 176.50 93.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 30.00 150.00 225.00 250.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 24.00 175.00 365.88 181.76 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 20.00 150.00 99.48 75.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 40.00 150.00 176.60 148.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 144.00 140.00 148.50 127.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 270.00 140.00 223.83 138.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 20.00 155.00 191.00 200.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 20.00 125.00 176.74 150.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 10.00 180.00 110.00 200.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 133 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00106 Sweeping (Sediment Removal) Hour =================================================== NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 50.00 150.00 213.09 340.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 80.00 140.00 139.00 150.01 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 20.00 125.00 161.50 110.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 10.00 160.00 400.00 400.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 40.00 145.00 172.56 102.93 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 40.00 150.00 281.92 420.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 180.00 150.00 60.93 45.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 40.00 150.00 169.40 225.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,130.00 137.62 178.32 151.47 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 24.00 200.00 158.59 166.41 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 40.00 150.00 139.50 132.00 IM0761-226 I76/SH52 Interchange 04/02/20 60.00 155.00 177.14 159.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 30.00 110.00 123.67 20.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 40.00 180.00 182.94 213.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 30.00 155.00 125.00 100.00 SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 60.00 165.00 20.00 20.00 NHPP1601-077 US 160 MP 29.750 - MP 34.891 04/09/20 8.00 350.00 170.00 150.00 SFTY2254-091 225 Ramp Improvements 04/09/20 60.00 175.00 212.50 125.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 150.00 170.00 173.63 55.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 38.00 160.00 214.00 186.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 30.00 150.00 175.00 145.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 100.00 140.00 151.88 140.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 20.00 120.00 174.33 185.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 360.00 130.00 127.15 50.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 150.00 150.00 101.50 79.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 50.00 150.00 160.50 160.50 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 20.00 165.00 142.28 1.00 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 200.00 50.00 136.69 75.00 NH050A-037 US 50A Pueblo Regional Pond IM025A-048 Northbound I-25 bridge at Exi 05/28/20 60.00 170.00 147.90 120.00 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 50.00 185.00 40.00 5.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 6.00 200.00 195.00 195.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 40.00 150.00 161.82 104.10 NHPPR100-251 SH 2/ Vasquez 06/25/20 100.00 150.00 147.08 128.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,726.00 140.60 141.71 90.79 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 30.00 100.00 110.62 20.00 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 10.00 150.00 174.95 154.10 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 134 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00106 Sweeping (Sediment Removal) Hour =================================================== NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 10.00 200.00 300.00 300.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 50.00 150.00 147.50 185.00 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 10.00 150.00 162.60 225.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 24.00 200.00 193.33 275.00 STR184B-006 CULVERTS SH 184 08/06/20 30.00 115.00 110.00 110.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 10.00 95.00 202.57 85.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 80.00 154.85 140.69 120.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 30.00 262.15 262.15 262.15 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 20.00 200.00 149.86 150.00 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 5.00 60.00 136.80 85.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 50.00 100.00 127.51 170.00 SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 300.00 200.00 47.50 75.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 20.00 140.00 175.33 120.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 100.00 136.79 134.82 134.82 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 779.00 167.82 121.91 122.16 MTCE0253-271 FY20 I-25 SIGN REPL PHASE 1 10/08/20 20.00 150.00 104.33 50.00 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 30.00 140.00 129.40 118.00 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 45.00 100.00 142.53 177.58 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 40.00 170.00 211.87 75.60 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 20.00 150.00 187.73 0.10 NHPP0702-407 PR I-70 Glenwood Springs Griz 11/03/20 5.00 120.00 279.24 125.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 100.00 180.00 250.00 135.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 40.00 180.00 208.63 312.00 C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 20.00 80.00 157.84 134.00 ITSITSB-002 ITS CV ROADSIDE UNITS 11/12/20 50.00 165.00 57.67 36.00 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 15.00 150.00 279.50 138.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 10.00 150.00 134.50 96.00 FSA1211-098 SH 121 & 1ST AVE 11/19/20 20.00 150.00 103.33 135.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 50.00 155.00 295.00 315.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 20.00 125.00 161.10 200.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 30.00 150.00 169.00 114.00 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 20.00 150.00 167.79 157.23 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 40.00 150.00 188.92 212.50 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 84.00 100.00 227.50 270.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 250.00 161.84 161.84 161.84 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 80.00 200.00 199.32 160.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 200.00 192.00 208.56 208.56 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,189.00 160.56 186.28 172.28 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,824.00 147.23 157.38 133.81 =============== 208-00107 Rem Trash Hour =================================================== STA0142-066 SH 14 New Raymer West 01/09/20 20.00 45.00 81.25 45.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 135 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00107 Rem Trash Hour =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 10.00 100.00 185.12 250.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 80.00 70.00 80.00 80.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 20.00 50.00 137.70 60.00 STA006A-067 SH 6 Merino to Atwood 01/16/20 20.00 45.00 99.50 115.00 STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 40.00 200.00 59.45 83.90 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 40.00 100.00 76.88 78.76 PWQM240-172 El Paso County, north Colorad 01/23/20 8.00 200.00 355.00 220.00 STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 20.00 110.00 69.00 69.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 30.00 100.00 180.00 60.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 12.00 100.00 234.94 194.88 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 35.00 120.00 134.20 54.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 40.00 60.00 68.00 61.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 40.00 125.00 69.45 75.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 20.00 150.00 138.88 135.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 40.00 100.00 100.85 85.00 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 15.00 200.00 58.70 37.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 40.00 100.00 82.02 71.17 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 40.00 100.00 190.00 170.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 208.00 120.00 112.61 87.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 72.00 110.00 84.33 43.70 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 10.00 112.00 106.40 210.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 860.00 108.14 110.57 86.12 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 12.00 185.00 144.54 234.82 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 40.00 100.00 126.60 161.50 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 28.00 70.00 56.50 10.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 40.00 80.00 72.16 80.40 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 20.00 110.00 41.88 43.75 SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 30.00 150.00 50.00 50.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 80.00 115.00 170.02 110.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 10.00 100.00 296.67 300.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 24.00 40.00 106.88 100.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 4.00 80.00 112.67 60.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 30.00 50.00 63.59 30.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 100.00 90.00 46.25 19.00 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 20.00 120.00 104.18 1.00 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 200.00 75.00 62.44 45.00 NH050A-037 US 50A Pueblo Regional Pond IM025A-048 Northbound I-25 bridge at Exi 05/28/20 60.00 120.00 108.33 110.00 NHPPR100-251 SH 2/ Vasquez 06/25/20 20.00 85.00 60.85 66.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 718.00 92.42 87.91 68.72 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 30.00 10.00 56.28 20.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 136 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00107 Rem Trash Hour =================================================== NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 10.00 100.00 98.51 138.04 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 20.00 89.00 128.67 46.00 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 20.00 150.00 57.50 45.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 20.00 70.00 56.75 45.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 20.00 85.00 50.00 65.00 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 4.00 65.00 237.20 215.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 10.00 95.00 120.29 65.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 60.00 91.75 76.63 100.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 24.00 94.56 94.56 94.56 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 10.00 100.00 151.12 85.00 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 5.00 60.00 173.00 55.00 SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 30.00 100.00 50.00 50.00 CR400-374 FY 20 Culvert Prioritization 09/17/20 3.00 117.00 173.00 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 266.00 85.77 86.81 69.59 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 15.00 120.00 153.10 40.50 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 40.00 150.00 67.27 77.80 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 20.00 100.00 65.68 0.10 NHPP0702-407 PR I-70 Glenwood Springs Griz 11/03/20 5.00 120.00 192.19 150.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 100.00 100.00 104.67 48.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 40.00 80.00 99.83 65.75 C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 10.00 120.00 121.30 37.00 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 10.00 110.00 259.75 79.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 10.00 100.00 69.25 33.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 10.00 123.00 77.00 64.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 15.00 180.00 72.15 70.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 5.00 50.00 98.36 47.00 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 24.00 90.00 133.28 147.34 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 40.00 75.00 107.68 106.25 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 28.00 50.00 100.00 75.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 160.00 60.00 78.80 66.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 532.00 88.80 93.34 67.46 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,376.00 96.56 96.11 74.83 =============== 208-00146 Pre-fab Conc Washout Str (Type 2) Each =================================================== FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 4.00 2250.00 1908.29 750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 2250.00 1908.29 750.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 2250.00 1908.29 750.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 137 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00200 Erosion Control Management LUMP SUM =============================================== STM094A-038 SH94 WB PASSING LANE 09/01/20 1.00 34588.91 34588.91 34588.91 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 34588.91 34588.91 34588.91 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1.00 124577.31 124577.31 124577.31 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1.00 1118176.50 1196448.86 1196448.86 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 621376.91 660513.09 660513.09 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 425780.91 451871.69 451871.69 =============== 208-00207 Erosion Control Management Day ==================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 32.00 150.00 305.00 305.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 102.00 175.00 384.58 596.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 120.00 250.00 251.64 140.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 60.00 200.00 252.51 105.01 PWQM240-172 El Paso County, north Colorad 01/23/20 90.00 200.00 626.00 922.00 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 75.00 200.00 515.11 380.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 100.00 200.00 144.60 50.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 25.00 500.00 415.00 400.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 36.00 200.00 334.17 165.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 35.00 600.00 630.65 435.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 90.00 215.00 206.01 400.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 80.00 250.00 521.68 600.03 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 29.00 500.00 375.50 351.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 90.00 230.00 175.88 139.16 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 75.00 200.00 598.33 540.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 131.00 210.00 281.04 427.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 36.00 280.00 262.55 280.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 58.00 250.00 261.00 275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,264.00 237.33 317.60 372.21 IM0761-226 I76/SH52 Interchange 04/02/20 275.00 160.00 188.33 106.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 24.00 150.00 470.67 1000.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 30.00 230.00 218.75 62.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 138 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00207 Erosion Control Management Day ==================================================== SFTY2254-091 225 Ramp Improvements 04/09/20 40.00 250.00 209.00 238.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 150.00 250.00 287.70 275.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 110.00 240.00 474.33 634.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 60.00 150.00 186.63 145.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 36.00 250.00 209.70 150.00 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 35.00 250.00 472.77 125.00 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 108.00 350.00 192.69 50.00 NH050A-037 US 50A Pueblo Regional Pond -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 868.00 222.29 242.25 229.74 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 35.00 200.00 489.38 475.00 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 10.00 500.00 475.50 150.00 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 30.00 230.00 199.70 142.40 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 30.00 300.00 81.75 95.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 50.00 300.00 72.50 95.00 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 20.00 1000.00 200.00 200.00 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 15.00 100.00 262.80 270.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 80.00 196.55 135.28 25.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 80.00 250.00 216.73 45.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 50.00 500.00 191.13 288.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 27.00 180.00 356.52 427.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 427.00 304.41 215.80 162.95 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 144.00 230.00 146.60 160.00 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 45.00 380.00 342.02 455.56 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 200.00 240.00 289.73 50.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 100.00 270.00 358.33 145.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 15.00 300.00 544.00 523.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 80.00 150.00 805.67 204.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 584.00 242.67 352.51 157.89 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,143.00 243.28 283.53 264.61 =============== 208-00300 Temporary Berms Lin Foot =============================================== PWQM240-172 El Paso County, north Colorad 01/23/20 250.00 8.00 11.50 10.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 139 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00300 Temporary Berms Lin Foot =============================================== STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 100.00 1.00 25.98 20.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 75,000.00 1.00 1.76 3.03 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 75,350.00 1.02 1.80 3.08 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 3,600.00 3.36 3.36 3.36 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 2,000.00 2.06 3.72 3.72 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5,600.00 2.90 3.49 3.49 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 80,950.00 1.15 1.84 3.10 =============== 208-00301 Temporary Diversion Lin Foot =============================================== HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 123.00 276.00 100.30 180.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 123.00 276.00 100.30 180.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 123.00 276.00 100.30 180.00 =============== 208-00400 Water Control LUMP SUM =============================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1.00 30000.00 95613.33 150000.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1.00 60000.00 116225.25 43000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 45000.00 110603.82 96500.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1.00 72000.00 65446.23 65446.23 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 72000.00 65446.23 65446.23 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 1.00 55000.00 47858.19 39849.11 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 1.00 18000.00 14666.67 20000.00 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 1.00 35000.00 14000.00 15000.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 1.00 50000.00 56000.00 15000.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 140 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00400 Water Control LUMP SUM =============================================== NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 1.00 60000.00 65000.00 65000.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 117208.88 126980.29 126980.29 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 55868.15 44208.63 46971.57 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 1.00 50000.00 33994.60 6373.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 1.00 10000.00 63055.00 18650.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1.00 335797.14 398165.73 398165.73 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 131932.38 78872.39 141062.91 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 74417.17 74145.80 80288.70 =============== 209-00600 Dust Palliative (Mg Cl) Gallon ================================================= NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 100,000.00 0.90 1.04 1.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 100,000.00 0.90 1.04 1.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 100,000.00 0.90 1.04 1.20 =============== 210-00001 Res Structure Each =================================================== C1601-082 Hawkins Signal and Curb Ramps 04/30/20 1.00 1000.00 1098.33 2300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 1000.00 1098.33 2300.00 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 1.00 2500.00 1100.00 2200.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 6.00 2000.00 2241.45 2107.23 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 3.00 50.00 710.65 489.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 1465.00 1634.02 1631.04 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 1.00 10000.00 11050.00 4480.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 10000.00 11050.00 4480.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 2137.50 2548.83 1924.20 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 141 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00002 Reset Structure LUMP SUM =============================================== SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1.00 10000.00 7318.80 9064.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 10000.00 7318.80 9064.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 10000.00 7318.80 9064.00 =============== 210-00010 Res Mailbox Str Each =================================================== STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 1.00 500.00 476.67 1000.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 7.00 375.00 427.37 423.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 390.63 429.87 495.56 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 2.00 500.00 696.59 232.94 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 500.00 696.59 232.94 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 2.00 250.00 670.00 808.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 250.00 670.00 808.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 385.42 498.38 503.87 =============== 210-00011 Res Mailbox Str (Ty 1) Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 81.00 241.00 169.76 181.00 STA006A-067 SH 6 Merino to Atwood 01/16/20 7.00 300.00 399.02 350.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 10.00 250.00 328.00 306.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 17.00 500.00 426.70 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 115.00 283.66 229.14 234.53 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 1.00 300.00 456.00 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 300.00 456.00 500.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 142 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00011 Res Mailbox Str (Ty 1) Each =================================================== STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 1.00 500.00 555.00 250.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 4.00 200.00 304.53 235.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 260.00 323.80 238.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 121.00 282.82 237.33 236.87 =============== 210-00012 Res Mailbox Str (Ty 2) Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 14.00 333.00 190.89 204.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 3.00 500.00 400.50 381.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 17.00 362.47 217.09 235.24 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 1.00 250.00 379.53 235.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 250.00 379.53 235.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18.00 356.22 235.14 235.22 =============== 210-00013 Res Mailbox Str (Ty 3) Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 9.00 483.00 369.71 397.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 2.00 500.00 788.06 900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11.00 486.09 445.78 488.45 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 1.00 375.00 485.50 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 375.00 485.50 500.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 1.00 300.00 479.53 235.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 300.00 479.53 235.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13.00 463.23 452.65 469.85 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 143 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00015 Res End Section Each =================================================== STR2871-038 US 287 Passing Lanes Springfi 03/05/20 3.00 1000.00 1267.17 530.01 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 1000.00 1267.17 530.01 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1.00 4893.00 4893.00 4893.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 4893.00 4893.00 4893.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 1973.25 1785.14 1620.76 =============== 210-00060 Res Marker Each =================================================== SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1.00 225.00 8320.00 11700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 225.00 8320.00 11700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 225.00 8320.00 11700.00 =============== 210-00065 Res Monument (Ty 3A) Each =================================================== C R100-288 R1 CURB RAMPS - PH 2 09/03/20 9.00 1000.00 975.75 1550.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 17.00 1000.00 366.36 306.79 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 26.00 1000.00 603.10 737.13 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26.00 1000.00 603.10 737.13 =============== 210-00090 Res Delineator Each =================================================== STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 356.00 25.00 16.50 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 356.00 25.00 16.50 15.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 100.00 2.00 45.63 31.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 100.00 2.00 45.63 31.25 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 144 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00090 Res Delineator Each =================================================== C R100-288 R1 CURB RAMPS - PH 2 09/03/20 3.00 100.00 169.17 24.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 100.00 169.17 24.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 459.00 20.48 25.72 18.60 =============== 210-00200 Reset Flagpole Each =================================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 650.00 1176.71 1650.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 650.00 1176.71 1650.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 650.00 1176.71 1650.00 =============== 210-00300 Res Brick Pavers Sq Yard ================================================ STRR300-249 Grand and Jackson Counties AD 03/05/20 15.00 100.00 169.17 150.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 21.00 200.00 123.33 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 36.00 158.33 142.43 126.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 36.00 158.33 142.43 126.67 =============== 210-00425 Res Bridge Railing Lin Foot =============================================== NHPPR100-251 SH 2/ Vasquez 06/25/20 40.00 80.00 106.23 91.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 40.00 80.00 106.23 91.45 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 92.00 130.00 214.86 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 92.00 130.00 214.86 12.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 132.00 114.85 202.85 36.08 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 145 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00427 Res Pipe Handrailing Lin Foot =============================================== HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 29.00 30.00 42.90 43.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 29.00 30.00 42.90 43.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 29.00 30.00 42.90 43.50 =============== 210-00473 Res TV Cameras Each =================================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1.00 1200.00 1223.33 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1200.00 1223.33 1200.00 IM0761-226 I76/SH52 Interchange 04/02/20 1.00 1500.00 646.57 700.66 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 1.00 2500.00 679.33 460.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 2000.00 656.40 580.33 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1.00 5769.75 5769.75 5769.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 5769.75 5769.75 5769.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 2742.44 1143.13 2032.60 =============== 210-00475 Res CCTV Pole Each =================================================== IM0761-226 I76/SH52 Interchange 04/02/20 1.00 1500.00 3175.71 3962.28 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 1500.00 3175.71 3962.28 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 8500.00 9095.00 9095.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 8500.00 9095.00 9095.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1.00 15172.50 15172.50 15172.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 146 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00475 Res CCTV Pole Each =================================================== NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1.00 1587.17 2585.51 2585.51 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 8379.84 8879.01 8879.01 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 6689.92 4908.30 7703.82 =============== 210-00476 Reset MVRD Each =================================================== SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 8.00 16000.00 714.20 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 16000.00 714.20 350.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 10.00 800.00 1090.00 1230.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 800.00 1090.00 1230.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18.00 7555.56 839.47 838.89 =============== 210-00477 Reset Weather Station Each =================================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 16000.00 17120.00 17120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 16000.00 17120.00 17120.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 16000.00 17120.00 17120.00 =============== 210-00479 Res Radio Com Antenna Each =================================================== FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 3.00 850.00 796.67 950.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 2.00 1000.00 574.10 338.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 910.00 679.53 705.40 FSAC010-124 US 40, US 287, SH 88 08/06/20 1.00 1000.00 778.33 750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1000.00 778.33 750.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 147 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00479 Res Radio Com Antenna Each =================================================== FSA1211-098 SH 121 & 1ST AVE 11/19/20 1.00 1000.00 479.33 525.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1000.00 479.33 525.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 935.71 667.36 686.00 =============== 210-00530 Rebuild Port of Present Str Sq Foot ================================================ NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 16.00 550.00 760.00 420.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 40.00 125.00 229.00 218.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 56.00 246.43 380.71 275.71 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 194.00 97.00 69.60 69.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 194.00 97.00 69.60 69.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 250.00 130.47 183.47 115.77 =============== 210-00750 Res Light Standard Each =================================================== IM0761-226 I76/SH52 Interchange 04/02/20 10.00 1400.00 1550.30 1189.32 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 1400.00 1550.30 1189.32 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 4.00 2500.00 2995.00 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 2500.00 2995.00 500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 1714.29 1761.72 992.37 =============== 210-00760 Res Luminaire Each =================================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 6.00 400.00 395.00 380.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 148 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00760 Res Luminaire Each =================================================== HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 2.00 380.00 244.50 247.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 395.00 367.64 346.75 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 2.00 350.00 277.67 270.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 350.00 277.67 270.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 386.00 348.36 331.40 =============== 210-00805 Res Overhead Sign Str Each =================================================== MPC040-061 R2 FY 21 Sign Replacement 10/01/20 2.00 11091.89 21625.00 20000.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 7.00 25188.92 26750.00 26750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9.00 22056.25 24886.36 25250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 22056.25 24886.36 25250.00 =============== 210-00810 Res Ground Sign Each =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 1.00 400.00 1689.59 255.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 3.00 230.00 325.00 325.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 5.00 295.00 317.04 340.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 12.00 300.00 348.67 500.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 1.00 300.00 462.00 650.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 5.00 300.00 366.67 275.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 138.00 175.00 224.60 193.81 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 4.00 300.00 301.86 290.92 STRR300-249 Grand and Jackson Counties AD 03/05/20 30.00 400.00 540.00 500.00 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 7.00 400.00 224.38 50.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 36.00 400.00 440.00 500.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 10.00 260.00 350.97 388.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 10.00 200.00 388.50 392.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 4.00 400.00 351.00 165.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 266.00 258.33 323.06 303.29 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 5.00 250.00 490.00 450.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 149 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00810 Res Ground Sign Each =================================================== IM0761-226 I76/SH52 Interchange 04/02/20 5.00 300.00 292.29 424.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 7.00 280.00 562.50 1000.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 10.00 300.00 456.25 437.50 SFTY2254-091 225 Ramp Improvements 04/09/20 4.00 400.00 720.00 700.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 7.00 300.00 358.33 375.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 2.00 300.00 628.67 322.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 2.00 250.00 180.88 150.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 2.00 255.00 367.67 120.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 8.00 300.00 266.72 500.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 2.00 300.00 270.21 270.21 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 8.00 320.00 453.00 593.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 62.00 299.68 373.89 510.30 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 5.00 300.00 293.75 500.00 STMM086-083 ADA PUEBLO METRO 07/09/20 72.00 200.00 325.00 250.00 MTCER300-255 MTCE R3 FY20/21 Signal Replac 07/09/20 25.00 300.00 387.50 200.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 10.00 400.00 247.50 220.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 13.00 600.00 236.00 50.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 31.00 200.00 317.00 260.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 30.00 350.00 552.02 264.09 MTCE0702-386 Grand Junction 09/03/20 2.00 1000.00 495.00 385.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 5.00 315.00 412.93 500.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 250.00 271.58 271.58 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 194.00 287.24 377.06 246.77 MPC040-061 R2 FY 21 Sign Replacement 10/01/20 1.00 318.27 400.00 450.00 MTCE0253-271 FY20 I-25 SIGN REPL PHASE 1 10/08/20 1.00 340.00 458.00 385.00 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 22.00 300.00 263.33 250.00 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 50.00 300.00 265.94 347.82 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 1.00 300.00 588.00 600.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 5.00 500.00 370.00 440.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1.00 426.39 426.39 426.39 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 16.00 400.00 378.17 435.00 CR100-342 US-6 at Garrison 12/17/20 16.00 300.00 302.50 50.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 22.00 879.92 941.51 941.51 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 135.00 415.13 338.29 410.56 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 657.00 302.99 347.66 328.18 =============== 210-00815 Res Sign Panel Each =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 4.00 100.00 1083.97 26.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 150 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00815 Res Sign Panel Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 8.00 150.00 212.03 227.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 1.00 350.00 100.00 100.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 1.00 200.00 256.00 176.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 7.00 120.00 138.34 150.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 5.00 195.00 291.02 370.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 5.00 50.00 204.67 270.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 4.00 200.00 61.16 72.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 29.00 450.00 232.00 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 64.00 282.27 244.53 168.66 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 23.00 400.00 99.06 93.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 6.00 90.00 375.00 160.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 15.00 200.00 211.67 150.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 3.00 165.00 341.67 500.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 8.00 180.00 170.25 173.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 55.00 266.82 149.96 149.94 FSAC010-124 US 40, US 287, SH 88 08/06/20 3.00 500.00 203.33 115.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 1.00 100.00 370.02 264.09 MTCE0702-386 Grand Junction 09/03/20 27.00 100.00 186.67 60.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 5.00 150.00 129.67 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 36.00 140.28 188.59 68.86 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 5.00 200.00 264.50 154.00 FSA1211-098 SH 121 & 1ST AVE 11/19/20 2.00 250.00 175.00 120.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 3.00 200.00 242.50 315.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 3.00 250.00 267.50 267.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 13.00 219.23 245.64 212.12 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 168.00 241.90 196.22 144.51 =============== 210-00816 Res Sign Panel (Spec) Each =================================================== HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 3.00 1000.00 442.50 225.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 1000.00 442.50 225.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 151 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00816 Res Sign Panel (Spec) Each =================================================== SFTY2254-091 225 Ramp Improvements 04/09/20 2.00 4000.00 1500.00 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 4000.00 1500.00 1500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 2200.00 865.50 735.00 =============== 210-00825 Res Flashing Beacon Each =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 2.00 2000.00 2500.00 2500.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 1.00 2500.00 4689.17 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 2166.67 4141.88 2666.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 2166.67 4141.88 2666.67 =============== 210-00827 Res Pull Box Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 4.00 700.00 1249.33 1843.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 1.00 550.00 1591.00 1600.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 1.00 800.00 1448.17 1400.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 13.00 1000.00 691.67 660.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 2.00 1000.00 324.58 316.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 2.00 270.00 888.00 896.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 23.00 856.09 792.19 929.39 IM0761-226 I76/SH52 Interchange 04/02/20 2.00 750.00 546.75 709.14 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 1.00 350.00 1176.67 1050.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 616.67 657.91 822.76 STMM086-083 ADA PUEBLO METRO 07/09/20 12.00 850.00 925.00 850.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 2.00 1200.00 1284.00 1284.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 14.00 900.00 952.62 912.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 152 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00827 Res Pull Box Each =================================================== STRM331-008 ADA RAMPS WALSENBURG 10/15/20 9.00 300.00 761.67 1000.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1.00 1575.00 1575.00 1575.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 427.50 790.71 1057.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 768.30 804.50 943.75 =============== 210-00831 Res Traf Sig Head Each =================================================== FSA2873-194 US 287 Longmont Intersection 02/13/20 2.00 700.00 907.50 330.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 700.00 907.50 330.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 3.00 350.00 2826.67 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 350.00 2826.67 5000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 490.00 1730.00 3132.00 =============== 210-00840 Res Traf Sig Pole Each =================================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1.00 4200.00 5366.67 5200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 4200.00 5366.67 5200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 4200.00 5366.67 5200.00 =============== 210-00845 Res Traf Sig Cntrlr Each =================================================== NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 1.00 1000.00 4112.50 4925.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1000.00 4112.50 4925.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1000.00 4112.50 4925.00 =============== 210-00846 Port Non-Intrus Traf Sens (Reset) Each =================================================== FSA1211-098 SH 121 & 1ST AVE 11/19/20 4.00 1500.00 727.33 270.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 1500.00 727.33 270.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 1500.00 727.33 270.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 153 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00855 Res Traf Sig Control Cab Each =================================================== NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 1.00 5000.00 3909.33 2365.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 1.00 2500.00 6660.00 3650.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 2.00 2000.00 2653.20 266.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 2875.00 3640.00 1636.75 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1.00 2065.91 2635.55 2635.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 2065.91 2635.55 2635.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 2713.18 3580.91 1836.51 =============== 210-00858 Res Pedestal Pole Each =================================================== HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1.00 800.00 999.00 1008.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 800.00 999.00 1008.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 6.00 700.00 1236.00 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 700.00 1236.00 250.00 STMM086-083 ADA PUEBLO METRO 07/09/20 1.00 1000.00 3300.00 2500.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 1.00 1000.00 2716.67 2000.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 3.00 1500.00 2942.67 4300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 1300.00 2944.26 3480.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 958.33 2138.70 1659.00 =============== 210-00859 Mod Ped Push Button Each =================================================== SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 3.00 500.00 339.75 195.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 500.00 339.75 195.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 500.00 339.75 195.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 154 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00860 Res Ped Push Button Each =================================================== HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 5.00 450.00 277.50 280.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 450.00 277.50 280.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 2.00 150.00 808.33 450.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 3.00 700.00 508.83 655.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 6.00 650.00 330.26 300.28 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 11.00 572.73 442.90 424.24 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 3.00 50.00 205.50 195.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 50.00 205.50 195.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19.00 457.89 383.65 350.09 =============== 210-00865 Res Ped Sig Head Each =================================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 4.00 200.00 550.45 603.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 200.00 550.45 603.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 200.00 550.45 603.00 =============== 210-00867 Res Fire Preempt Unit Each =================================================== FSA2873-194 US 287 Longmont Intersection 02/13/20 1.00 1000.00 1001.83 635.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 2.00 900.00 1848.33 1800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 933.33 1425.08 1411.67 C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 3.00 1000.00 854.83 800.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 3.00 500.00 927.33 1090.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 750.00 891.08 945.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 155 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00867 Res Fire Preempt Unit Each =================================================== SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 5.00 450.00 655.00 800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 450.00 655.00 800.00 FSA1211-098 SH 121 & 1ST AVE 11/19/20 1.00 1500.00 984.67 440.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1500.00 984.67 440.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15.00 736.67 991.73 956.33 =============== 210-00870 Res Coordination Unit Each =================================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 2.00 1000.00 880.00 850.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1.00 500.00 666.00 672.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 833.33 826.50 790.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 833.33 826.50 790.67 =============== 210-00882 Res Detector Each =================================================== SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 2.00 1000.00 1048.00 1240.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 1000.00 1048.00 1240.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1000.00 1048.00 1240.00 =============== 210-00890 Res Int Detect Sys (Camera) Each =================================================== FSA2873-194 US 287 Longmont Intersection 02/13/20 1.00 1400.00 1495.50 1050.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1.00 1000.00 1641.21 1625.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1200.00 1578.76 1337.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1200.00 1578.76 1337.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 156 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-01000 Res Fence Lin Foot =============================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 24.00 25.00 28.44 34.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 315.00 15.00 12.43 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 339.00 15.71 13.57 13.56 IM0761-226 I76/SH52 Interchange 04/02/20 302.00 30.00 11.00 10.39 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 165.00 75.00 16.51 27.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 100.00 40.00 19.10 22.00 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 1,117.00 6.00 6.78 3.00 NH050A-037 US 50A Pueblo Regional Pond -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,684.00 19.08 9.26 7.85 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 97.00 20.00 7.00 7.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 33.00 25.00 20.80 10.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 2,167.00 7.85 5.65 4.90 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 48.00 25.00 49.50 32.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,345.00 8.94 6.45 5.61 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 10.00 100.00 51.67 25.00 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 575.00 50000.00 22.81 22.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 585.00 49147.01 23.11 22.64 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,953.00 5816.56 9.10 8.93 =============== 210-01010 Res Gate Post Each =================================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 2.00 1000.00 473.33 460.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1000.00 473.33 460.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1000.00 473.33 460.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 157 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-01011 Res Gate Each =================================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1.00 500.00 490.00 470.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 500.00 490.00 470.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 3.00 450.00 367.57 440.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 450.00 367.57 440.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 1.00 600.00 4956.67 4350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 600.00 4956.67 4350.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 490.00 1213.08 1228.00 =============== 210-01050 Res C L Fence Lin Foot =============================================== SHE 0703-461 I-70 and Kipling North Phase 03/26/20 400.00 20.00 17.00 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 400.00 20.00 17.00 13.00 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 225.00 20.00 42.79 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 225.00 20.00 42.79 15.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 50.00 13.00 35.00 36.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 50.00 13.00 35.00 36.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 675.00 19.48 26.81 15.37 =============== 210-01130 Res Gdrail Ty 3 Lin Foot =============================================== IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 871.00 35.00 24.72 24.44 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 158 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-01130 Res Gdrail Ty 3 Lin Foot =============================================== NHPPR100-251 SH 2/ Vasquez 06/25/20 25.00 40.00 118.35 60.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 896.00 35.14 27.33 25.45 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 150.00 60.00 125.00 75.00 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 170.00 50.00 24.09 19.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 320.00 54.69 61.47 45.31 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,216.00 40.28 37.96 30.68 =============== 210-01170 Res Gdrail Ty 7 Lin Foot =============================================== NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 43.00 40.00 34.46 32.16 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 43.00 40.00 34.46 32.16 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 43.00 40.00 34.46 32.16 =============== 210-01190 Reset Tensioned Cable Barrier Lin Foot =============================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 7,040.00 20.00 17.70 17.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7,040.00 20.00 17.70 17.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,040.00 20.00 17.70 17.60 =============== 210-01200 Res End Anchorage Each =================================================== IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 3.00 1800.00 3472.22 3444.44 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 1800.00 3472.22 3444.44 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 2.00 2500.00 1857.23 1275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 2500.00 1857.23 1275.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 2080.00 2664.73 2576.66 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 159 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-01700 Res Sprinkler Head Each =================================================== C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 15.00 60.00 78.34 52.68 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 15.00 60.00 78.34 52.68 CR100-342 US-6 at Garrison 12/17/20 15.00 90.00 253.00 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 15.00 90.00 253.00 35.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 75.00 173.61 43.84 =============== 210-01710 Res Valve Each =================================================== STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 9.00 500.00 1516.24 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9.00 500.00 1516.24 2500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 500.00 1516.24 2500.00 =============== 210-02003 Relay Pipe (3 In) Lin Foot =============================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 400.00 15.00 38.91 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 400.00 15.00 38.91 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 400.00 15.00 38.91 50.00 =============== 210-02004 Relay Pipe (4 In) Lin Foot =============================================== SFTY2254-091 225 Ramp Improvements 04/09/20 35.00 100.00 39.50 54.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 35.00 100.00 39.50 54.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 35.00 100.00 39.50 54.00 =============== 210-02042 Relay Pipe (42 In) Lin Foot =============================================== NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 60.00 320.00 417.44 417.44 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 60.00 320.00 417.44 417.44 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 60.00 320.00 417.44 417.44 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 160 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-02048 Relay Pipe (48 In) Lin Foot =============================================== NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 12.00 100.00 526.00 529.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 12.00 100.00 526.00 529.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 100.00 526.00 529.00 =============== 210-02510 Relay Sprinkler System LUMP SUM =============================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1.00 10000.00 15166.67 29600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 10000.00 15166.67 29600.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 1.00 8000.00 3783.33 2350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 8000.00 3783.33 2350.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 1.00 10000.00 14816.33 5300.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 1.00 5000.00 16867.23 10536.13 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 7500.00 15748.56 7918.07 CR100-342 US-6 at Garrison 12/17/20 1.00 8000.00 20908.33 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 8000.00 20908.33 5000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 8200.00 15458.01 10557.23 =============== 210-02804 Grinding: Sidwlk and/or Curb Ramp Repair Lin Foot =============================================== STRR300-249 Grand and Jackson Counties AD 03/05/20 137.00 30.00 59.83 34.00 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 66.00 30.00 34.26 41.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 203.00 30.00 49.83 36.28 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 161 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-02804 Grinding: Sidwlk and/or Curb Ramp Repair Lin Foot =============================================== STMM086-083 ADA PUEBLO METRO 07/09/20 991.00 10.00 51.00 50.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 231.00 35.00 54.00 37.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,222.00 14.73 51.78 47.54 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,425.00 16.90 51.39 45.94 =============== 210-04010 Adj Manhole Each =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 4.00 750.00 875.00 875.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 49.00 750.00 1287.60 1259.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 8.00 700.00 750.00 600.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 92.00 800.00 2131.88 2778.75 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 1.00 1000.00 941.80 729.00 STRR300-249 Grand and Jackson Counties AD 03/05/20 2.00 750.00 730.67 480.00 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 2.00 750.00 561.25 310.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 18.00 1000.00 1661.67 1300.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 4.00 2000.00 1183.96 2500.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1.00 700.00 1303.20 1166.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 181.00 826.80 1615.53 2002.82 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 10.00 1700.00 2107.65 2480.98 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 3.00 1500.00 964.50 1000.00 IM0761-226 I76/SH52 Interchange 04/02/20 7.00 1000.00 910.30 530.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 2.00 750.00 1552.99 227.00 SFTY2254-091 225 Ramp Improvements 04/09/20 1.00 850.00 1337.50 1685.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 3.00 1000.00 2103.33 755.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 26.00 1301.92 1419.71 1381.68 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 1.00 1000.00 992.80 1615.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 2.00 750.00 600.00 300.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 6.00 750.00 828.33 605.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 2.00 750.00 777.91 549.54 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 15.00 750.00 996.29 1000.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 162 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-04010 Adj Manhole Each =================================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 500.00 535.00 535.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 27.00 750.00 928.27 832.56 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 2.00 1000.00 683.33 500.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 122.00 1200.00 917.00 635.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 5.00 900.00 1069.99 1100.00 CR100-342 US-6 at Garrison 12/17/20 3.00 750.00 639.17 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 132.00 1175.38 910.79 647.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 366.00 980.60 1243.83 1383.56 =============== 210-04015 Modify Manhole Each =================================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1.00 5000.00 2440.00 3200.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1.00 2800.00 3251.50 6700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 3900.00 3030.18 4950.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 3900.00 3030.18 4950.00 =============== 210-04016 Modify Manhole (Spec) Each =================================================== SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1.00 1500.00 2575.00 4125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1500.00 2575.00 4125.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1500.00 2575.00 4125.00 =============== 210-04020 Modify Inlet Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 18.00 2250.00 4185.00 4005.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 18.00 2250.00 4185.00 4005.00 IM0761-226 I76/SH52 Interchange 04/02/20 1.00 2700.00 2955.06 2100.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 163 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-04020 Modify Inlet Each =================================================== SFTY2254-091 225 Ramp Improvements 04/09/20 1.00 3500.00 4745.00 4890.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 3100.00 3352.83 3495.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 1.00 7500.00 4702.50 5700.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 6.00 6000.00 5081.62 5808.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7.00 6214.29 5018.44 5792.67 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 2.00 3500.00 1916.67 500.00 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 1.00 2500.00 8220.00 12560.00 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 3.00 2000.00 8010.07 5650.00 CR100-342 US-6 at Garrison 12/17/20 4.00 5000.00 3891.67 1650.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 3550.00 4801.21 3711.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 37.00 3397.30 4528.23 4236.18 =============== 210-04025 Modify Structure Each =================================================== STRR300-249 Grand and Jackson Counties AD 03/05/20 3.00 7000.00 1259.67 870.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 7000.00 1259.67 870.00 NHPPR100-251 SH 2/ Vasquez 06/25/20 1.00 5000.00 3375.15 3169.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 5000.00 3375.15 3169.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 6500.00 1644.30 1444.83 =============== 210-04050 Adj Valve Box Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 45.00 393.00 676.45 824.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 4.00 450.00 425.00 250.00 STRR300-249 Grand and Jackson Counties AD 03/05/20 3.00 400.00 695.00 1000.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 164 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-04050 Adj Valve Box Each =================================================== CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 2.00 400.00 461.25 800.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 11.00 750.00 591.67 950.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1.00 800.00 698.61 1400.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 2.00 300.00 714.20 583.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 68.00 457.87 648.92 819.06 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 6.00 1500.00 242.00 275.00 IM0761-226 I76/SH52 Interchange 04/02/20 11.00 600.00 617.30 530.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 9.00 350.00 443.33 350.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 4.00 400.00 441.67 450.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 1.00 300.00 1619.00 493.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 31.00 666.13 553.91 416.87 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 2.00 350.00 565.20 915.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 2.00 450.00 686.33 750.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 7.00 500.00 383.33 400.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 15.00 450.00 422.58 445.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 4.00 450.00 568.68 393.40 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 2.00 350.00 530.43 1000.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 5.00 500.00 511.27 278.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 37.00 455.41 471.15 480.23 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 3.00 500.00 408.33 250.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 32.00 500.00 433.33 300.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 3.00 600.00 695.00 1040.00 CR100-342 US-6 at Garrison 12/17/20 3.00 500.00 395.00 320.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 41.00 507.32 438.41 351.95 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 177.00 505.28 537.81 569.59 =============== 210-04060 Adj Water Meter Each =================================================== SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1.00 300.00 2226.00 1090.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 300.00 2226.00 1090.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 300.00 2226.00 1090.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 165 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-04200 Adj Gdrail Lin Foot =============================================== NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 12,941.00 10.00 6.94 5.88 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 9,237.50 78472.50 7.30 7.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 22,178.50 32690.18 7.03 6.47 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 75.00 100.00 40.14 41.43 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 75.00 100.00 40.14 41.43 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 22,253.50 32580.34 7.25 6.59 =============== 211-01110 Rock Reinf (Dowels) Each =================================================== C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 100.00 2000.00 1604.80 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 100.00 2000.00 1604.80 1500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 100.00 2000.00 1604.80 1500.00 =============== 211-01115 Rock Reinf (No.10) Lin Foot =============================================== C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 2,850.00 100.00 135.00 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,850.00 100.00 135.00 110.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 500.00 175.00 133.06 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 500.00 175.00 133.06 100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,350.00 111.19 134.65 108.51 =============== 211-02277 Cement Grout (Voids) Cubic Yard ============================================= STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 18.00 2000.00 1500.00 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 18.00 2000.00 1500.00 1500.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 166 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 211-02277 Cement Grout (Voids) Cubic Yard ============================================= STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 10.00 1288.00 1316.67 650.00 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 1.00 1500.00 4550.00 1000.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 85.00 1000.00 750.00 750.00 STR184B-006 CULVERTS SH 184 08/06/20 11.00 1725.00 750.00 750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 107.00 1106.12 865.49 742.99 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 30.00 700.00 1186.25 370.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 30.00 700.00 1186.25 370.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 155.00 1131.32 1007.69 758.71 =============== 211-03005 Dewatering LUMP SUM =============================================== BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 1.00 15000.00 77422.50 96000.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC PWQM240-172 El Paso County, north Colorad 01/23/20 1.00 250000.00 345000.00 400000.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1.00 15000.00 137125.60 50000.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1.00 10000.00 7538.50 5855.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 72500.00 125923.16 137963.75 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 1.00 25000.00 26949.12 15000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 25000.00 26949.12 15000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 63000.00 92931.81 113371.00 =============== 212-00006 Seeding (Native) Acre =================================================== STA0142-066 SH 14 New Raymer West 01/09/20 0.50 2500.00 3767.25 800.00 FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 0.60 850.00 1313.89 1210.00 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 0.10 10000.00 8398.33 2720.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 167 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00006 Seeding (Native) Acre =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 0.90 1500.00 825.00 825.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 3.20 950.00 970.96 1159.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 1.90 1200.00 1290.84 1050.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 0.30 3500.00 2005.00 1510.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 0.90 1000.00 1200.78 1101.56 PWQM240-172 El Paso County, north Colorad 01/23/20 11.10 1000.00 2987.50 875.00 STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 0.95 675.00 1600.00 1600.00 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 36.30 1000.00 1182.65 540.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 6.10 1000.00 630.40 452.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 0.20 3000.00 1350.00 1200.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 0.30 2000.00 4897.00 9000.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 0.50 2000.00 3060.89 4700.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 0.50 1000.00 21369.21 40000.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 0.30 550.00 3847.17 6000.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 0.65 4000.00 1654.17 1200.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 0.10 3000.00 1100.00 1200.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 120.00 500.00 405.18 390.55 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 0.20 2000.00 4550.00 8000.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 0.49 5000.00 1250.00 1250.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 10.00 500.00 1523.81 1037.79 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 1.00 800.00 2322.26 1621.19 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 5.80 2000.00 1296.67 1300.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 39.00 1000.00 759.76 840.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 0.15 5000.00 4033.15 6820.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 242.04 790.31 850.00 715.88 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 0.50 2500.00 2367.27 2097.29 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 0.50 2000.00 1690.00 1700.00 IM0761-226 I76/SH52 Interchange 04/02/20 21.30 630.00 591.03 500.11 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 2.70 2000.00 1681.67 2500.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 23.80 370.00 788.87 727.74 SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 0.25 1000.00 500.00 500.00 SFTY2254-091 225 Ramp Improvements 04/09/20 1.70 1200.00 1420.00 840.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 15.40 1000.00 577.35 473.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 0.10 1000.00 15570.17 20240.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 0.03 2000.00 8970.00 21000.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 0.15 2000.00 2608.33 1870.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 3.90 1000.00 691.25 500.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 0.16 5000.00 6907.33 3472.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 2.20 3000.00 3109.56 844.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 17.00 600.00 624.24 624.24 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 13.40 1000.00 1758.10 0.10 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 168 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00006 Seeding (Native) Acre =================================================== NH050A-035 US 50A Pueblo Regional Pond 05/28/20 28.00 1000.00 744.34 400.00 NH050A-037 US 50A Pueblo Regional Pond ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 1.60 3000.00 3023.75 1562.50 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 0.04 15000.00 4144.67 4550.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 0.42 5000.00 3444.49 1371.43 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 133.15 889.41 859.44 584.50 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 0.34 5000.00 5277.83 4950.00 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 1.50 1000.00 2349.90 1630.90 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 1.10 1500.00 7666.67 8000.00 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 0.19 1600.00 7750.00 3500.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 0.44 1600.00 6900.00 1800.00 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 0.60 2000.00 2200.00 2200.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 0.80 1000.00 1272.50 1545.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 0.10 2000.00 9574.00 17772.00 STR184B-006 CULVERTS SH 184 08/06/20 0.34 5000.00 2200.00 2200.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 0.10 2100.00 6581.14 1400.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 2.30 1443.20 1421.55 1440.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 6.00 1249.06 1249.06 1249.06 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 6.00 1600.00 1216.00 1200.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 21.00 500.00 744.01 675.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 12.00 1600.00 1531.80 1433.80 SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 0.25 2500.00 1000.00 1500.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 0.02 800.00 40666.67 11000.00 CR400-374 FY 20 Culvert Prioritization 09/17/20 0.11 5000.00 5849.25 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 53.19 1151.96 1321.00 1313.49 MPC040-061 R2 FY 21 Sign Replacement 10/01/20 0.25 2526.43 1300.00 100.00 MTCE0253-271 FY20 I-25 SIGN REPL PHASE 1 10/08/20 0.20 1000.00 2844.67 2500.00 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 0.20 1000.00 8626.67 6500.00 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 2.18 800.00 1783.00 1155.00 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 21.10 600.00 1566.29 1598.86 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 0.75 5000.00 5033.33 1500.00 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 65.40 895.00 679.63 400.00 NHPP0702-407 PR I-70 Glenwood Springs Griz 11/03/20 0.50 3000.00 3943.61 2500.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 0.50 2500.00 1956.67 3500.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 0.30 2000.00 1982.88 2940.00 C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 0.50 3000.00 2938.06 1700.00 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 0.05 5000.00 25175.00 52900.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 0.80 3500.00 2731.50 2543.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 169 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00006 Seeding (Native) Acre =================================================== STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 0.20 2000.00 3869.98 6000.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 1.00 5000.00 1758.77 1150.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 0.05 10000.00 7315.00 5630.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 65.00 450.00 707.50 749.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 151.00 628.87 672.89 672.89 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 309.98 695.94 801.71 734.56 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 738.36 794.62 880.44 743.08 =============== 212-00007 Seeding (Native) (Hydraulic) Acre =================================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 26.80 2000.00 892.70 731.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 26.80 2000.00 892.70 731.50 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 2.30 1000.00 1777.11 1800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.30 1000.00 1777.11 1800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 29.10 1920.96 954.48 815.95 =============== 212-00009 Seeding (Temporary) Acre =================================================== NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 10.00 500.00 374.50 374.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 500.00 374.50 374.50 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 10.00 698.78 461.39 461.39 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 698.78 461.39 461.39 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 0.66 669.65 669.65 669.65 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 25.00 412.37 441.24 441.24 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 25.66 418.99 447.11 447.11 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 45.66 498.01 434.34 434.34 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 170 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00022 Seeding (Riparian) Acre =================================================== FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 0.24 2464.31 2464.31 2464.31 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 0.40 2324.75 2487.48 2487.48 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 0.64 2377.09 2478.79 2478.79 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 0.64 2377.09 2478.79 2478.79 =============== 212-00024 Seeding (Upland Grassland) Acre =================================================== FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 6.91 664.28 664.28 664.28 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.91 664.28 664.28 664.28 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.91 664.28 664.28 664.28 =============== 212-00028 Seeding (Wetlands) Acre =================================================== BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 0.20 7500.00 5280.59 4500.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 0.20 7500.00 5280.59 4500.00 IM0761-226 I76/SH52 Interchange 04/02/20 0.50 3000.00 2770.45 3084.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 0.50 3000.00 2770.45 3084.60 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 0.02 10000.00 25000.00 25000.00 STR184B-006 CULVERTS SH 184 08/06/20 0.01 6400.00 25000.00 25000.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 0.24 1000.00 3865.26 4500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 0.27 1866.67 4236.05 6777.78 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 0.25 2500.00 8270.00 11650.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 171 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00028 Seeding (Wetlands) Acre =================================================== NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 0.01 5000.00 63933.33 9300.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 0.10 4800.00 6067.08 1280.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 0.70 3917.53 4191.76 4191.76 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.06 3676.67 7298.44 5724.28 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.03 3645.95 4683.75 5093.61 =============== 212-00032 Soil Conditioning Acre =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 0.60 2800.00 3826.34 3510.00 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 0.10 15000.00 28648.33 12700.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 0.90 3000.00 5250.00 5250.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 3.20 1750.00 2584.50 2812.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 1.90 3500.00 3261.74 3300.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 0.30 3500.00 3175.00 1350.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 0.90 3000.00 2808.25 2616.49 PWQM240-172 El Paso County, north Colorad 01/23/20 7.10 3000.00 3552.50 3105.00 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 36.30 3000.00 2777.94 2640.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 6.10 3000.00 3072.00 2850.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 0.20 5000.00 4500.00 3000.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 0.30 6000.00 6539.75 10000.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 0.50 2500.00 4778.75 8500.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 0.50 3100.00 32354.45 60000.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 0.30 2500.00 6497.86 7000.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 0.65 5000.00 4407.39 4725.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 0.10 5000.00 2746.00 4492.00 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 0.20 4000.00 10150.00 15000.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 0.49 8000.00 4500.00 4500.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 10.00 3000.00 3349.32 3714.75 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 1.00 3000.00 3332.75 3048.97 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 5.80 4000.00 3183.33 3100.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 0.15 4000.00 13461.80 12320.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 77.59 3118.96 3143.79 3481.01 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 0.50 5000.00 6183.96 5395.25 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 0.50 3000.00 6510.00 6500.00 IM0761-226 I76/SH52 Interchange 04/02/20 21.80 2500.00 2071.61 2305.50 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 2.70 5000.00 4378.33 5000.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 23.80 2000.00 3227.72 3655.43 SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 0.25 1000.00 500.00 500.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 172 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00032 Soil Conditioning Acre =================================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 42.20 2700.00 3242.54 2849.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 0.10 2700.00 12298.95 16185.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 0.03 5000.00 25490.00 37000.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 0.15 3000.00 7777.33 5700.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 3.90 2800.00 2517.63 2400.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 0.16 6000.00 9969.17 3720.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 2.20 3000.00 6764.29 5905.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 17.00 3100.00 3104.92 3104.92 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 13.40 3200.00 2948.75 10.00 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 1.60 5000.00 3739.25 1562.50 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 0.05 20000.00 16319.67 18000.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 0.42 10000.00 5959.87 5433.33 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 130.76 2767.82 3010.58 2769.88 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 0.34 5000.00 15440.51 6600.00 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 1.30 3200.00 6329.22 6225.00 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 0.19 2500.00 5875.00 3750.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 0.44 3000.00 4250.00 3000.00 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 0.60 6000.00 4000.00 4000.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 0.80 3500.00 3982.50 2965.00 STR184B-006 CULVERTS SH 184 08/06/20 0.34 6000.00 6000.00 6000.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 0.10 2700.00 22127.86 4400.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 2.30 4083.15 4740.43 4670.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 6.00 3957.91 3957.91 3957.91 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 2.30 3500.00 3607.89 3700.00 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 6.00 4000.00 4947.60 4500.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 21.00 2500.00 2372.57 558.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 12.00 1100.00 633.35 525.05 SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 0.25 2500.00 1000.00 1500.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 0.02 1500.00 41433.33 11000.00 CR400-374 FY 20 Culvert Prioritization 09/17/20 0.11 7000.00 9634.25 9000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 54.09 2748.73 2670.35 2019.28 MTCE0253-271 FY20 I-25 SIGN REPL PHASE 1 10/08/20 0.20 2500.00 5196.67 2500.00 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 2.18 3000.00 4846.20 4851.00 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 21.10 2500.00 1512.29 536.87 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 0.75 8000.00 11153.33 5560.00 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 65.40 2000.00 2285.88 350.00 NHPP0702-407 PR I-70 Glenwood Springs Griz 11/03/20 0.50 10000.00 4888.52 7113.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 173 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00032 Soil Conditioning Acre =================================================== NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 0.50 8000.00 6566.67 8000.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 0.30 4000.00 8101.56 10055.00 C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 0.50 10000.00 8033.84 7750.00 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 0.05 7500.00 25350.00 52900.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 0.80 5700.00 5670.00 5640.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 0.20 4500.00 6963.47 10000.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 1.00 6000.00 8876.76 6100.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 0.05 20000.00 24690.00 21380.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 8.00 3053.57 3053.57 3053.57 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 65.00 350.00 560.67 1070.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 151.90 2216.49 2371.64 2371.64 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 318.43 1910.90 1731.34 1678.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 580.87 2343.19 2413.88 2196.66 =============== 212-00050 Sod Sq Foot ================================================ HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 2,125.00 3.00 2.13 2.25 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1,577.00 5.00 3.05 2.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,702.00 3.85 2.73 2.46 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 270.00 5.00 5.50 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 270.00 5.00 5.50 8.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 200.00 5.50 8.67 7.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 300.00 5.00 4.57 1.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 3,000.00 5.00 4.30 0.79 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,500.00 5.03 4.48 1.16 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 110.00 2.75 10.00 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 110.00 2.75 10.00 4.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,582.00 4.42 3.89 2.08 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 174 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00100 Tree Retention and Protection LUMP SUM =============================================== FSAC010-124 US 40, US 287, SH 88 08/06/20 1.00 3000.00 5583.33 7500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 3000.00 5583.33 7500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 3000.00 5583.33 7500.00 =============== 212-00700 Organic Fertilizer Pound ================================================== FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 510.00 3.00 0.72 1.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 510.00 3.00 0.72 1.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 510.00 3.00 0.72 1.50 =============== 212-00701 Compost (Mech App) Cubic Yard ============================================= SHE 0703-461 I-70 and Kipling North Phase 03/26/20 70.00 60.00 99.60 132.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 70.00 60.00 99.60 132.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 69.00 40.00 46.93 78.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 69.00 40.00 46.93 78.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 139.00 50.07 65.91 105.19 =============== 212-00703 Humate Pound ================================================== SHE 0703-461 I-70 and Kipling North Phase 03/26/20 80.00 10.00 3.90 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 80.00 10.00 3.90 5.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 324.00 2.00 1.36 1.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 324.00 2.00 1.36 1.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 404.00 3.58 1.67 2.19 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 175 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00704 Mycorrhizae Pound ================================================== SHE 0703-461 I-70 and Kipling North Phase 03/26/20 20.00 20.00 25.20 27.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 20.00 25.20 27.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 33.00 15.00 9.53 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 33.00 15.00 9.53 10.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 53.00 16.89 13.47 16.42 =============== 212-00705 Elemental Sulfur Pound ================================================== SHE 0703-461 I-70 and Kipling North Phase 03/26/20 24.00 5.00 11.20 17.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 24.00 5.00 11.20 17.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 24.00 5.00 11.20 17.00 =============== 212-00706 Seed (Native) Drill Acre =================================================== SHE 0703-461 I-70 and Kipling North Phase 03/26/20 0.10 1000.00 6218.00 8250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 0.10 1000.00 6218.00 8250.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 1.30 1500.00 825.99 475.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.30 1500.00 825.99 475.00 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 0.25 8000.00 9987.00 9300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 0.25 8000.00 9987.00 9300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.65 2454.55 1724.25 2283.33 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 176 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00708 Seed (Native) Brdcst Acre =================================================== SHE 0703-461 I-70 and Kipling North Phase 03/26/20 0.30 1000.00 3792.00 5500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 0.30 1000.00 3792.00 5500.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 0.40 4000.00 1513.88 750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 0.40 4000.00 1513.88 750.00 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 0.32 5500.00 8013.13 7410.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 0.32 5500.00 8013.13 7410.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.02 3588.24 3353.41 4236.47 =============== 212-00711 Seeding (Wetland) Broadcast Acre =================================================== FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 0.20 7000.00 1798.18 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 0.20 7000.00 1798.18 1500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 0.20 7000.00 1798.18 1500.00 =============== 212-00900 Compost Cubic Yard ============================================= C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 101.00 26.00 33.04 31.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 101.00 26.00 33.04 31.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 101.00 26.00 33.04 31.00 =============== 212-01200 Landscape Restoration LUMP SUM =============================================== C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 1.00 10000.00 4000.00 5000.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1.00 6000.00 6000.00 11800.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 177 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-01200 Landscape Restoration LUMP SUM =============================================== HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1.00 1000.00 7764.25 11200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 5666.67 5932.64 9333.33 C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 1.00 2500.00 6343.33 2030.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 2500.00 6343.33 2030.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 4875.00 6055.85 7507.50 =============== 213-00000 Mulching Acre =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 0.60 2000.00 1096.57 1010.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 0.60 2000.00 1096.57 1010.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 0.60 2000.00 1096.57 1010.00 =============== 213-00002 Mulching (Weed Free Hay) Acre =================================================== STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 0.95 1200.00 2500.00 2500.00 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 36.30 800.00 879.34 660.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 6.10 2000.00 700.30 559.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 0.30 2000.00 3397.90 6000.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 0.50 7700.00 6722.33 12000.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 0.30 750.00 3676.21 6000.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 10.00 1000.00 906.94 1082.25 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 5.30 4000.00 1438.33 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 59.75 1309.71 943.50 972.64 SFTY2254-091 225 Ramp Improvements 04/09/20 1.70 1000.00 1495.00 1190.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 14.70 750.00 938.89 880.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1601-082 Hawkins Signal and Curb Ramps 04/30/20 0.03 4000.00 12663.33 24000.00 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 28.00 650.00 930.13 600.00 NH050A-037 US 50A Pueblo Regional Pond FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 0.04 5000.00 6432.00 7075.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 44.47 702.61 943.65 736.72 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 178 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00002 Mulching (Weed Free Hay) Acre =================================================== NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 1.30 1100.00 1275.39 746.60 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 0.27 2500.00 2350.00 2200.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 0.10 2000.00 8357.33 17772.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 2.30 2144.49 1155.78 1270.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 21.00 1000.00 2401.38 264.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 12.00 1100.00 1301.41 1280.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 36.97 1120.84 1885.26 735.13 MPC040-061 R2 FY 21 Sign Replacement 10/01/20 0.25 3792.53 1300.00 100.00 MTCE0253-271 FY20 I-25 SIGN REPL PHASE 1 10/08/20 0.20 1000.00 3096.67 2500.00 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 0.20 2000.00 8050.00 6500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 0.65 2381.74 4316.47 2807.69 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 141.84 1075.05 1217.58 845.18 =============== 213-00003 Mulching (Weed Free) Acre =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 0.20 5000.00 1618.73 2103.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 2.10 900.00 925.34 675.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC PWQM240-172 El Paso County, north Colorad 01/23/20 11.10 700.00 859.00 948.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 0.49 1500.00 2110.00 2110.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 1.00 1000.00 1148.87 967.03 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 39.00 650.00 706.99 635.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 53.89 700.41 736.45 726.05 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 0.50 3500.00 4218.74 3403.37 IM0761-226 I76/SH52 Interchange 04/02/20 18.40 650.00 1189.32 548.55 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 2.70 2000.00 1389.67 2500.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 0.15 1000.00 4347.67 1960.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 3.90 1000.00 1130.50 1100.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 0.10 600.00 11681.43 1446.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 13.00 800.00 792.52 792.52 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 179 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00003 Mulching (Weed Free) Acre =================================================== ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 13.40 1200.00 1907.84 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 52.15 953.02 1400.67 646.41 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 0.25 3500.00 4876.55 4560.00 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 0.34 5000.00 6805.21 4950.00 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 0.60 3000.00 2300.00 2300.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 0.80 1000.00 1905.00 1810.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 0.10 1000.00 12316.64 2800.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 3.00 510.98 510.98 510.98 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 26.00 286.28 792.52 792.52 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 31.09 458.39 1544.00 902.85 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 21.10 650.00 1291.55 1274.64 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 65.40 860.00 652.49 400.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 0.30 4000.00 4517.10 6310.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 0.80 3500.00 1875.50 1651.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 0.05 6000.00 14440.00 10880.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 116.80 546.39 584.64 584.64 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 204.45 675.36 720.90 611.88 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 341.58 701.95 889.18 661.65 =============== 213-00004 Mulching (Weed Free Straw) Acre =================================================== NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 120.00 500.00 624.20 602.61 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 120.00 500.00 624.20 602.61 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 0.16 5000.00 4979.67 4464.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 0.16 5000.00 4979.67 4464.00 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 1.22 3100.00 3566.67 3700.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 180 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00004 Mulching (Weed Free Straw) Acre =================================================== STR184B-006 CULVERTS SH 184 08/06/20 0.35 5000.00 2100.00 2100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.57 3523.57 3438.65 3343.31 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 6.90 735.00 735.00 735.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.90 735.00 735.00 735.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 128.63 555.11 662.28 647.97 =============== 213-00007 Mulching (Wood Strand) Acre =================================================== ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 29.00 7500.00 9524.40 11000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 29.00 7500.00 9524.40 11000.00 NHPP0702-407 PR I-70 Glenwood Springs Griz 11/03/20 0.50 10000.00 7379.88 14000.00 C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 0.50 10000.00 14951.11 13800.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 60.00 800.00 6895.00 6660.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 61.00 950.82 6952.33 6778.69 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 90.00 3061.11 7685.04 8138.89 =============== 213-00008 Mulching (Wood Chip) Cubic Foot ============================================= C R100-288 R1 CURB RAMPS - PH 2 09/03/20 100.00 15.00 12.96 3.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 100.00 20.00 16.50 2.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 200.00 17.50 14.57 2.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 200.00 17.50 14.57 2.65 =============== 213-00011 Mulching (Hydraulic) Acre =================================================== IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 23.80 480.00 1328.95 1157.89 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 23.80 480.00 1328.95 1157.89 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 181 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00011 Mulching (Hydraulic) Acre =================================================== NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 40.00 1200.00 1351.67 1470.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 40.00 1200.00 1351.67 1470.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 63.80 931.41 1347.91 1353.57 =============== 213-00012 Spray-on Mulch Blanket Acre =================================================== NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 0.90 4500.00 4268.96 4037.92 PWQM240-172 El Paso County, north Colorad 01/23/20 4.00 3500.00 3450.00 3400.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 0.50 3500.00 5834.49 9400.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 0.65 6000.00 4565.16 4445.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 0.10 2000.00 2610.50 4221.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 1.00 3500.00 4091.49 4141.14 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 0.15 4000.00 9231.90 11030.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7.30 3835.62 4217.86 4252.21 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 0.50 3000.00 7125.00 7000.00 IM0761-226 I76/SH52 Interchange 04/02/20 0.25 4700.00 4964.72 4380.45 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 1.50 3000.00 3825.00 2500.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 1.60 3500.00 2988.57 3000.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 10.00 3700.00 3797.55 3797.55 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 0.42 5200.00 5895.63 6807.14 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 14.27 3641.14 3745.70 3782.73 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 2.30 4500.00 3746.58 3500.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 0.02 300.00 61950.00 11000.00 CR400-374 FY 20 Culvert Prioritization 09/17/20 0.11 8000.00 10137.50 7000.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 10.00 3411.07 3754.12 3754.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.43 3648.17 3986.42 3747.48 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 1.05 5000.00 5122.00 4240.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 182 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00012 Spray-on Mulch Blanket Acre =================================================== NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 0.75 7000.00 6295.00 5760.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 0.50 5000.00 6470.00 7500.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 1.00 4000.00 7962.34 5900.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 10.00 3247.42 3474.74 3474.74 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 13.30 3719.86 5221.60 3997.70 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 47.30 3695.14 4236.49 3906.37 =============== 213-00061 Mulch Tackifier Pound ================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 120.00 3.00 3.83 3.60 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 160.00 6.00 1.75 0.90 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 400.00 3.50 3.14 2.85 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC PWQM240-172 El Paso County, north Colorad 01/23/20 2,420.00 3.10 2.78 3.05 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 7,260.00 5.00 6.01 2.88 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 1,300.00 2.50 1.89 1.60 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 56.00 5.00 14.93 10.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 100.00 5.00 17.28 30.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 60.00 3.00 12.54 24.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 24,000.00 4.00 2.05 1.95 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 98.00 100.00 4.50 4.50 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 2,000.00 5.00 2.83 3.04 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1,060.00 6.00 1.67 1.15 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 5,200.00 2.75 2.48 2.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 44,234.00 4.23 3.07 2.39 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 100.00 10.00 8.16 9.45 IM0761-226 I76/SH52 Interchange 04/02/20 3,680.00 2.40 2.49 2.35 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 540.00 3.00 2.83 2.00 SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 40.00 3.00 20.00 20.00 SFTY2254-091 225 Ramp Improvements 04/09/20 340.00 5.00 2.30 0.60 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 7,156.00 3.00 2.11 2.22 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1601-082 Hawkins Signal and Curb Ramps 04/30/20 6.00 15.00 56.33 115.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 30.00 10.00 16.42 7.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 34.00 4.00 19.00 24.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 20.00 5.00 63.70 8.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 8,280.00 2.40 2.44 2.44 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 2,680.00 3.00 2.17 0.10 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 5,600.00 3.00 2.14 1.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 183 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00061 Mulch Tackifier Pound ================================================== NH050A-037 US 50A Pueblo Regional Pond ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 320.00 5.00 11.75 11.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 4.00 25.00 74.17 72.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 28,830.00 2.84 2.33 2.06 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 51.00 12.00 13.00 13.00 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 68.00 5.00 28.11 4.50 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 279.00 4.00 3.75 3.45 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 54.00 3.50 6.63 5.00 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 155.00 4.00 5.00 5.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 160.00 2.50 3.50 4.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 20.00 7.00 15.22 24.00 STR184B-006 CULVERTS SH 184 08/06/20 64.00 20.00 8.00 8.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 460.00 7.87 2.54 2.70 STM094A-038 SH94 WB PASSING LANE 09/01/20 700.00 1.79 1.79 1.79 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 4,200.00 5.00 2.74 3.65 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 2,300.00 2.50 2.36 2.25 SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 50.00 10.00 260.00 500.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 5,280.00 1.68 2.44 2.44 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 13,841.00 3.30 3.35 4.73 MPC040-061 R2 FY 21 Sign Replacement 10/01/20 50.00 7.31 11.00 10.00 MTCE0253-271 FY20 I-25 SIGN REPL PHASE 1 10/08/20 20.00 2.75 43.17 45.00 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 10.00 5.00 52.33 60.00 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 4,220.00 2.50 3.94 3.32 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 13,020.00 3.00 2.42 1.50 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 200.00 6.00 4.00 4.50 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 170.00 13.00 14.63 1.25 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 4.00 3.00 325.00 100.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 23,370.00 2.11 2.26 2.26 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 41,064.00 2.50 2.66 2.19 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 127,969.00 3.26 2.78 2.51 =============== 213-00067 Rock Mulch (Weed Free) Sq Foot ================================================ STRR300-249 Grand and Jackson Counties AD 03/05/20 363.00 15.00 15.33 25.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 184 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00067 Rock Mulch (Weed Free) Sq Foot ================================================ CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 37.00 15.00 20.23 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 400.00 15.00 15.92 24.54 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 239.00 25.00 10.83 10.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 200.00 20.00 15.43 10.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 200.00 30.00 20.65 10.06 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 639.00 25.00 16.09 10.02 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 550.00 20.00 15.72 2.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 550.00 20.00 15.72 2.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,589.00 20.75 15.95 10.95 =============== 213-00070 Landscape Weed Barr Fabric Sq Yard ================================================ C1601-082 Hawkins Signal and Curb Ramps 04/30/20 2.00 20.00 162.33 330.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 20.00 162.33 330.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 200.00 3.00 8.86 7.50 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 200.00 5.00 9.43 7.54 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 4,116.00 2.18 2.15 2.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,516.00 2.34 4.58 2.63 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,518.00 2.35 4.73 2.77 =============== 213-00150 Bonded Fiber Matrix Acre =================================================== PWQM240-172 El Paso County, north Colorad 01/23/20 5.00 3300.00 3450.00 3400.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 1.00 3000.00 4116.49 4141.14 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 5.80 3000.00 2460.00 2700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11.80 3127.12 3084.87 3118.74 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 185 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00150 Bonded Fiber Matrix Acre =================================================== STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 1.50 3500.00 3937.33 2500.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 27.50 3100.00 2533.85 2409.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 1.50 3200.00 2922.46 3000.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 10.00 3700.00 3754.12 3754.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 40.50 3266.67 2629.68 2766.39 STM094A-038 SH94 WB PASSING LANE 09/01/20 5.00 2740.52 2740.52 2740.52 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 8.00 2800.00 3311.31 4170.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 10.00 3411.07 3754.12 3754.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 23.00 3052.75 3336.30 3678.43 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 5.00 2919.64 2919.64 2919.64 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 20.00 2930.00 2471.67 2690.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 50.00 2010.31 2151.03 2151.03 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 75.00 2316.18 2392.86 2346.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 150.30 2748.68 2665.67 2723.84 =============== 213-00470 Landscape Border (1/4x5 In) Lin Foot =============================================== C R100-288 R1 CURB RAMPS - PH 2 09/03/20 150.00 7.00 11.28 6.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 150.00 7.00 11.28 6.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 150.00 7.00 11.28 6.50 =============== 213-00700 Landscape Boulder Each =================================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 55.00 500.00 185.00 290.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 55.00 500.00 185.00 290.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 55.00 500.00 185.00 290.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 186 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 214-00000 Landscape Maintenance LUMP SUM =============================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 1.00 25000.00 1906.67 1050.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1.00 17000.00 7896.00 8250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 21000.00 5650.00 4650.00 SFTY2254-091 225 Ramp Improvements 04/09/20 1.00 25000.00 5750.00 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 25000.00 5750.00 1500.00 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 1.00 5000.00 32999.50 31000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 5000.00 32999.50 31000.00 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 1.00 3000.00 9000.00 10600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 3000.00 9000.00 10600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 15000.00 12483.22 10480.00 =============== 214-00005 Landscape Maintenance (24 Month) LUMP SUM =============================================== NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 1.00 7500.00 22218.00 14590.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 7500.00 22218.00 14590.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 25000.00 31557.22 29150.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1.00 28400.00 28769.28 28769.28 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 26700.00 31247.45 28959.64 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1.00 10000.00 13047.83 7500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 10000.00 13047.83 7500.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 187 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 214-00005 Landscape Maintenance (24 Month) LUMP SUM =============================================== FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1.00 13903.35 13903.35 13903.35 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1.00 41237.11 84662.37 84662.37 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 27570.23 49282.86 49282.86 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 21006.74 25313.81 29762.50 =============== 214-00201 Deciduous Tree (Tubeling) Each =================================================== NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 5.00 100.00 107.00 107.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 100.00 107.00 107.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 100.00 107.00 107.00 =============== 214-00222 Decid Tree (2 In Cal) (Furnish) Each =================================================== SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1.00 400.00 1213.40 1375.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 400.00 1213.40 1375.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 7.00 500.00 803.51 990.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7.00 500.00 803.51 990.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 487.50 841.46 1038.13 =============== 214-00330 Deciduous Shrub (3 Gal) Each =================================================== NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 44.00 70.00 43.25 53.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 44.00 70.00 43.25 53.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 44.00 70.00 43.25 53.00 =============== 214-00504 Evergreen Tree (4 Ft)(B-B) Each =================================================== NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 12.00 700.00 680.57 608.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.00 700.00 680.57 608.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 700.00 680.57 608.20 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 188 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 214-01011 Live Brush Mattress Lin Foot =============================================== NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 225.00 67.01 71.70 71.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 225.00 67.01 71.70 71.70 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 225.00 67.01 71.70 71.70 =============== 214-01013 Live Willow Stakes Each =================================================== NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 475.00 8.00 5.00 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 475.00 8.00 5.00 5.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 475.00 8.00 5.00 5.00 =============== 214-01032 Large Woody Material Each =================================================== FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 1.00 2500.00 1790.63 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 2500.00 1790.63 500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2500.00 1790.63 500.00 =============== 214-01403 Nursery Stock Container (DRC # 60) Each =================================================== C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 25.00 50.00 74.75 69.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 25.00 50.00 74.75 69.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25.00 50.00 74.75 69.00 =============== 215-00700 Transplant Sod Sq Yard ================================================ NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 272.00 80.00 29.02 76.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 272.00 80.00 29.02 76.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 272.00 80.00 29.02 76.80 =============== 216-00021 Soil Reten Blanket (Cl 1) Sq Yard ================================================ STM094A-038 SH94 WB PASSING LANE 09/01/20 13,460.00 3.04 3.04 3.04 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 13,460.00 3.04 3.04 3.04 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 189 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 216-00021 Soil Reten Blanket (Cl 1) Sq Yard ================================================ FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 18,400.00 2.19 2.19 2.19 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 18,400.00 2.19 2.19 2.19 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 31,860.00 2.55 2.55 2.55 =============== 216-00041 Soil Reten Blanket (S/C) Sq Yard ================================================ CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 2,300.00 2.50 2.85 2.60 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,300.00 2.50 2.85 2.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,300.00 2.50 2.85 2.60 =============== 216-00070 Geocell Confinement Sys Sq Yard ================================================ CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 2,990.00 60.00 29.36 16.34 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,990.00 60.00 29.36 16.34 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 359.00 60.00 51.39 45.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 359.00 60.00 51.39 45.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,349.00 60.00 31.45 19.44 =============== 216-00101 Soil Reten Blanket (S-C)(PhotoD Cl 1) Sq Yard ================================================ FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 4,340.00 5.00 3.75 3.75 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 21,580.00 3.00 2.10 1.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 25,920.00 3.33 2.16 2.04 C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 968.00 4.00 4.80 4.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 968.00 4.00 4.80 4.25 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 190 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 216-00101 Soil Reten Blanket (S-C)(PhotoD Cl 1) Sq Yard ================================================ NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 340.00 4.00 6.00 6.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 4,226.00 3.00 3.93 3.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,566.00 3.07 3.95 4.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 31,454.00 3.32 2.59 2.41 =============== 216-00111 Soil Reten Blanket (Excel)(PhotoD Cl 1) Sq Yard ================================================ STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 2,250.00 3.00 5.00 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,250.00 3.00 5.00 5.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,250.00 3.00 5.00 5.00 =============== 216-00201 Soil Reten Blanket (S-C)(BioD Cl 1) Sq Yard ================================================ NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 100.00 11.00 60.50 96.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 14,470.00 2.40 4.38 5.00 STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 1,000.00 4.00 3.40 3.55 PWQM240-172 El Paso County, north Colorad 01/23/20 14,808.00 2.50 2.65 2.80 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 100.00 2.50 5.56 5.82 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 1,000.00 3.50 3.78 3.55 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 968.00 3.00 3.18 3.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 105.00 4.00 4.15 4.15 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 8,000.00 2.50 2.71 2.19 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 2,717.00 4.00 4.78 5.50 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 19,079.00 2.40 2.50 2.50 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1,813.00 3.00 3.40 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 64,160.00 2.59 2.99 3.43 IM0761-226 I76/SH52 Interchange 04/02/20 16,633.00 2.00 2.74 2.44 SFTY2254-091 225 Ramp Improvements 04/09/20 1,166.00 4.00 3.25 2.50 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 18,449.00 7.00 3.23 2.98 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 800.00 4.00 2.78 2.60 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 191 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 216-00201 Soil Reten Blanket (S-C)(BioD Cl 1) Sq Yard ================================================ ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 10,600.00 7.00 3.84 3.19 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 15,960.00 2.60 2.66 2.66 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 54,300.00 2.50 2.73 2.40 NH050A-037 US 50A Pueblo Regional Pond -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 117,908.00 3.58 2.89 2.60 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 485.00 3.50 5.49 6.00 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 778.00 2.00 3.54 2.21 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 463.00 5.00 4.25 4.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 1,047.00 5.00 3.75 3.50 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 2,000.00 3.50 3.00 3.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 1,560.00 3.78 3.38 3.60 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 100.00 2.34 3.25 3.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6,433.00 3.72 3.56 3.43 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 5,912.00 8.70 3.98 2.30 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 3,500.00 4.00 3.95 3.85 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 250.00 4.00 8.31 11.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 968.00 3.00 3.95 5.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 30,000.00 2.25 2.38 2.05 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 121,240.00 2.01 2.15 2.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 161,870.00 2.35 2.52 2.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 350,371.00 2.83 2.83 2.59 =============== 216-00211 Soil Reten Blanket (Exc)(BioD Cl 1) Sq Yard ================================================ ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 50.00 6.00 25.84 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 50.00 6.00 25.84 10.00 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 200.00 10.00 7.58 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 200.00 10.00 7.58 11.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 192 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 216-00211 Soil Reten Blanket (Exc)(BioD Cl 1) Sq Yard ================================================ ITS ITSB-003 ITS FIBER ON I-76 10/29/20 180.00 20.00 4.81 5.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 180.00 20.00 4.81 5.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 430.00 13.72 8.20 8.69 =============== 216-00221 Soil Reten Blanket (C)(BioD Cl 1) Sq Yard ================================================ FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 604.00 3.50 3.25 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 604.00 3.50 3.25 3.00 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 555.00 4.75 4.00 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 555.00 4.75 4.00 4.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,159.00 4.10 3.43 3.48 =============== 216-00301 Turf Reinf Mat (Cl 1) Sq Yard ================================================ NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 12,649.00 6.50 4.96 4.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12,649.00 6.50 4.96 4.65 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 424.00 8.00 6.50 5.25 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 440.00 7.00 6.80 6.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 864.00 7.49 6.74 5.96 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 400.00 4.75 4.75 4.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 400.00 4.75 4.75 4.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13,913.00 6.51 5.03 4.73 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 193 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 216-00302 Turf Reinf Mat (Cl 2) Sq Yard ================================================ NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 19,079.00 8.00 5.77 5.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 19,079.00 8.00 5.77 5.30 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 200.00 5.87 5.87 5.87 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 200.00 5.87 5.87 5.87 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19,279.00 7.98 5.77 5.31 =============== 216-00303 Turf Reinf Mat (Cl 3) Sq Yard ================================================ NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 113.00 10.00 7.63 8.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 113.00 10.00 7.63 8.50 STM094A-038 SH94 WB PASSING LANE 09/01/20 13,460.00 5.26 5.26 5.26 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 13,460.00 5.26 5.26 5.26 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 300.00 7.01 7.01 7.01 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 300.00 7.01 7.01 7.01 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13,873.00 5.34 5.35 5.32 =============== 217-00000 Herbicide Treatment Sq Yard ================================================ FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 3,000.00 3.50 0.57 0.55 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 5,982.00 0.42 0.35 0.30 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 200.00 10.00 5.63 5.25 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 500.00 120.00 3.17 1.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9,682.00 7.75 0.84 0.56 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 194 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 217-00000 Herbicide Treatment Sq Yard ================================================ SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 199.00 6.00 3.83 6.63 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 199.00 6.00 3.83 6.63 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 10.00 160.00 53.64 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 160.00 53.64 50.00 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 200.00 200.00 7.92 1.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 100.00 2.00 1.83 1.70 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 4,200.00 2.00 0.70 0.40 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 5,000.00 2.00 0.35 0.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9,500.00 6.17 0.66 0.43 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19,391.00 7.03 0.83 0.58 =============== 217-00020 Herbicide Treatment Hour =================================================== PWQM240-172 El Paso County, north Colorad 01/23/20 8.00 200.00 246.00 202.00 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 20.00 150.00 163.42 80.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 8.00 125.00 214.20 165.00