Colorado Department of Transportation 15:29 Friday, January 22, 2021 1 2020 Cost Data PROJECTS BID FROM 01/01/20 THROUGH 12/31/20 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20200109 SIMON CONTRACTORS 4 $5,477,794.00 99.11 STA0142-066 SH 14 New Raymer West 4 R 20200109 MARTIN MARIETTA MATERIALS 3 $19,964,032.84 114.09 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA R 4 P 20200109 MOUNTAIN CONSTRUCTORS, INC. 1 $1,871,822.50 122.04 FSA0341-097 US 34 & MACGREGOR INTERSECTION 4 M 20200109 HAMON INFRASTRUCTURE, INC. 3 $1,356,000.00 108.39 FSA0253-262 I-25 SB BOTTLENECK I-76 TO I-7 1 U 20200109 STURGEON ELECTRIC COMPANY, INC 3 $756,000.00 96.02 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND OF 4 R 20200109 SURFACE PREPARATION TECHNOLOGIES 2 $887,234.48 113.49 SHER500-210 R5 FY19 CENTER LINE RUMBLE STR 5 R 20200116 ZAK DIRT, INC. 6 $5,310,755.65 101.62 BR0343-040 US 34 REPUBLICAN RIVER BRIDGES 4 P FBR0343-043 US 34 D-28-P STRUCTURE REPLACE 4 P 20200116 Kilgore Companies, LLC dba Elam Construc 2 $1,359,498.00 90.33 STR131A-038 SH 131 MP 51.95-55.73, ROUTT C 3 M 20200116 MCATEE CONSTRUCTION CO. 2 $3,766,927.45 96.38 STA006A-067 SH 6 Merino to Atwood 4 R 20200123 APC SOUTHERN CONSTRUCTION COMPANY, LLC 2 $7,035,527.04 111.68 NH 0503-093 US50 WEST OF TEXAS CREEK MP 25 2 M 20200123 REDLINE PIPELINE, LLC 2 $7,664,700.70 116.13 PWQM240-172 El Paso County, north Colorado 2 R 20200130 OLDCASTLE SW GROUP, INC. 5 $10,688,093.10 92.40 STR141A-044 SH 141 AND SH 145, FROM SLICKR 5 R 20200130 AMERICAN WEST CONSTRUCTION, LLC 1 $547,985.00 110.70 STR012A-050 CULVERT REPAIR I-25 AND US 350 2 P 20200206 MCATEE CONSTRUCTION CO. 2 $12,072,994.45 114.74 STA059A-036 SH 59 SEIBERT TO COPE 4 P 20200206 BRANNAN SAND AND GRAVEL, LLC 2 $5,223,224.95 108.53 STA0703-443 I-70 EJMT TUNNELS PAVING 1 M 20200206 DILLIE AND KUHN, INC. 5 $3,179,048.10 72.30 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 00 P 20200206 AMERICAN CIVIL CONSTRUCTORS, LLC dba A 2 $7,686,500.00 119.92 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESURF 1 U Colorado Department of Transportation 15:29 Friday, January 22, 2021 2 2020 Cost Data PROJECTS BID FROM 01/01/20 THROUGH 12/31/20 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20200206 ROADSAFE TRAFFIC SYSTEMS, INC 2 $3,474,413.60 106.39 MTCER300-257 R3 FY 20/21 Region Wide Epoxy 3 M 20200206 HAMILTON CONSTRUCTION CO. 5 $3,357,952.85 84.13 NHPP4701-134 C-470 NOISE WALL WEST OF LUCEN 1 U 20200213 A and S CONSTRUCTION CO. 2 $5,376,000.00 114.38 STA069A-033 SH69 MP 58.7 TO 71.58 2 M 20200213 DURAN EXCAVATING, INC. 6 $1,160,406.20 106.49 FSA2873-194 US 287 Longmont Intersection I 4 U 20200213 A and S CONSTRUCTION CO. 3 $8,883,000.00 92.53 STR116A-001 SH 116 A Surface Treatment Pro 2 P 20200213 Straight Stripe Painting, Inc. 4 $2,068,435.00 116.92 MTCER500-213 R5 FY 20 / FY 21 STRIPING 5 M 20200227 Casper Electric, Inc. 4 $3,425,884.84 88.90 NHPP0702-359 I-70 No Name Tunnel Lighting 3 M 20200227 Casper Electric, Inc. 2 $1,081,340.90 97.02 C0402-094 US 40 GRAND COUNTY SIGNAL REPL 3 R 20200227 MARTIN MARIETTA MATERIALS 3 $5,351,155.83 113.85 NH0242-085 US 24 M.P. 291.38 to M.P. 296. 2 R 20200227 A and S CONSTRUCTION CO. 3 $6,758,000.00 96.46 STR0101-027 SH 10 Overlay La Junta West 2 P 20200305 APC SOUTHERN CONSTRUCTION COMPANY, LLC 3 $21,320,469.84 95.83 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 1 5 P 20200305 SEMA CONSTRUCTION, INC. 3 $14,138,928.75 119.86 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON SP 3 M 20200305 OLDCASTLE SW GROUP, INC. 4 $3,758,750.22 94.53 NHPP0502-082 US 50 MONTROSE RE CHIP SEAL 3 R 20200305 KSK, LLC 3 $1,400,000.00 110.27 STRR300-249 Grand and Jackson Counties ADA 3 M 20200305 TEZAK HEAVY EQUIPMENT CO., INC. 7 $2,071,985.91 94.18 BR025A-046 K-18-U ON I-25 AT MP112 BRIDGE 2 R 20200305 CASTLE ROCK CONST. CO. OF COLO, LLC 2 $4,519,619.33 100.44 STR2871-038 US 287 Passing Lanes Springfie 2 P 20200305 OLDCASTLE SW GROUP, INC. 1 $4,469,722.20 91.55 NHPP145A-080 SH 145 Keystone-Placerville Re 5 M Colorado Department of Transportation 15:29 Friday, January 22, 2021 3 2020 Cost Data PROJECTS BID FROM 01/01/20 THROUGH 12/31/20 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20200305 KSK, LLC 4 $300,000.00 70.28 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 3 U 20200305 OLDCASTLE SW GROUP, INC. 2 $4,422,918.00 70.62 C0641-106 SH 64 Meeker West Rural Resurf 3 R 20200326 MOUNTAIN VALLEY CONTRACTING, INC. 2 $2,761,591.15 110.11 HPP 0501-067 US 50 AND SH 92 DELTA INTERSEC 3 U 20200326 KIRKLAND CONSTRUCTION, LLLP 8 $32,992,239.13 103.10 NH050A-034 US50A PUEBLO WEST PURCELL INTE 2 R 20200326 DURAN EXCAVATING, INC. 5 $2,391,211.25 96.23 SHE 0703-461 I-70 and Kipling North Phase 1 U 20200402 CASTLE ROCK CONST. CO. OF COLO, LLC 7 $11,765,116.33 89.67 IM0761-226 I76/SH52 Interchange 4 R 20200402 KSK, LLC 3 $1,235,000.00 107.36 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 3 R 20200402 OLDCASTLE SW GROUP, INC. 3 $6,333,543.94 100.47 NHPP1602-169 US 160 WC TUNNEL EAST RESURFAC 5 M 20200402 Kilgore Companies, LLC dba Elam Construc 4 $7,604,366.80 97.23 STR0341-101 SH 34 North of Grandby Resurfa 3 M 20200402 OLDCASTLE SW GROUP, INC. 2 $5,574,468.91 97.49 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 3 M 20200402 ROADSAFE TRAFFIC SYSTEMS, INC 2 $753,924.25 110.04 MTCER300-259 MTCE R3 FY20/21 Region Wide St 3 M 20200409 INTERMOUNTAIN SLURRY SEAL, INC. 3 $1,303,347.00 83.16 NHPP1601-077 US 160 MP 29.750 - MP 34.891 5 R 20200409 ABCO CONTRACTING, INC. 2 $3,226,884.00 76.19 SFTY2254-091 225 Ramp Improvements 1 U 20200409 TRICON 2, LLC 2 $2,277,000.00 103.50 IM0252-473 I-25 CABLE BARRIER PHASE IV 2 R 20200409 CC ENTRPRS TRAFFIC CONTROL SPECIALISTS 1 $2,165,914.00 114.25 SHER100-339 WWD TRAFFIC CONTROL ENHANCEMEN 1 R 20200423 CASTLE ROCK CONST. CO. OF COLO, LLC 8 $23,753,931.10 86.61 CC0852-106 US-85 LOUVIERS TO MP 191.75 1 R FBR0852-108 US-85 BETWEEN LOUVIERS AND MP 1 R 20200423 Lumin8 Transportation Tech. 3 $1,679,401.00 95.54 C1211-090 SH-121 & 29th Ave / SH-121 & S 1 U Colorado Department of Transportation 15:29 Friday, January 22, 2021 4 2020 Cost Data PROJECTS BID FROM 01/01/20 THROUGH 12/31/20 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20200430 CONCRETE WORKS OF COLORADO INC. 3 $5,247,258.00 160.28 FSA1602-159 US 160 AND SH 17 INTERSECTION 5 U 20200430 OLDCASTLE SW GROUP, INC. 3 $1,827,783.00 126.03 C1601-082 Hawkins Signal and Curb Ramps 5 U 20200507 Lumin8 Transportation Tech. 3 $1,762,713.21 93.97 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 1 U 20200507 ZAK DIRT, INC. 8 $1,913,218.60 79.71 C0853-112 US85 & WCR98 INTERSECTION IMPR 4 R 20200507 ZAK DIRT, INC. 9 $2,466,070.75 88.17 FBR0343-042 US 34 D-27-G STRUCTURE REPLACE 4 P 20200514 INTERFACE COMMUNICATIONS COMPANY 4 $2,136,538.00 58.90 ITS SW02-304 ITS FIBER TO STATE BUILDINGS I 00 M 20200514 OLDCASTLE SW GROUP, INC. 3 $1,038,174.50 102.50 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 1 3 M 20200515 RLW/SEMA, A Joint Venture 1 $8,274,649.78 100.59 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 & 4 R 20200521 ROADSAFE TRAFFIC SYSTEMS, INC 2 $12,348,544.30 107.77 MTCE R100-341 Various Highways in Region 1 1 U 20200528 KIRKLAND CONSTRUCTION, LLLP 8 $1,975,485.70 89.79 NH050A-035 US 50A Pueblo Regional Pond 2 R NH050A-037 US 50A Pueblo Regional Pond 2 R 20200528 STURGEON ELECTRIC COMPANY, INC 2 $995,960.00 73.40 SHER400-373 R4 Signal Head Backplate Insta 4 R 20200528 PAONIA, INC 5 $2,221,563.29 57.59 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, S 00 R 20200528 TLM CONSTRUCTORS, INC. 3 $610,899.00 81.45 IM025A-048 Northbound I-25 bridge at Exit 2 M 20200528 HARVEY CONTRACTORS INC 4 $3,254,518.92 95.72 MTCER200-265 Pueblo 2 R 20200611 PAONIA, INC 2 $1,488,325.00 60.77 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 00 P 20200611 Lumin8 Transportation Tech. 3 $630,460.00 91.28 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENTS 4 U 20200618 MAIN ELECTRIC LTD 5 $1,409,599.14 78.31 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 2 U Colorado Department of Transportation 15:29 Friday, January 22, 2021 5 2020 Cost Data PROJECTS BID FROM 01/01/20 THROUGH 12/31/20 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20200623 LAWRENCE CONSTRUCTION CO. 1 $77,748,000.00 100.00 NHPP5501-029 US 550/160 CONNECTION SOUTH DB 5 M 20200625 RALPH L. WADSWORTH CONSTRUCTION CO., LLC 2 $919,658.19 103.51 NHPPR100-251 SH 2/ Vasquez 1 U 20200702 INNOVATIVE MARKING SYSTEMS, INC. 5 $3,429,416.85 83.41 MTCER400-381 REGION 4 FY21 EPOXY 4 R 20200709 MIDWEST ROCKFALL, INC. 4 $2,880,537.20 105.37 C 0741-020 GEOHAZARD SH 74 MORRISON TO EV 1 M 20200709 TEZAK HEAVY EQUIPMENT CO., INC. 6 $570,845.95 63.43 NH0504-908 US50B PUEBLO (MP 318) STR K-18 2 P 20200709 VmCo Inc 4 $663,037.00 66.76 MTCER300-255 MTCE R3 FY20/21 Signal Replace 3 M 20200709 NORAA CONCRETE CONSTRUCTION CORPORATION 2 $2,523,898.00 143.37 STMM086-083 ADA PUEBLO METRO 2 U 20200709 MORTON ELECTRIC, INC. 6 $756,948.90 82.72 ITS 070A-033 I-70 FROM BENNETT TO BURLINGTO 00 P 20200709 AMERICAN WEST CONSTRUCTION, LLC 3 $537,943.45 97.81 STR012A-053 CRITICAL CULVERT REPAIR CO 12 2 M 20200709 KOLBE STRIPING INC. 3 $385,150.00 95.70 MTCER300-258 MTCE R3 FY20 Region Roundabout 3 M 20200723 AMERICAN CIVIL CONSTRUCTORS, LLC dba A 1 $357,160.00 76.64 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOUR 5 R 20200723 Frontier Environmental Services, LLC 2 $424,274.00 58.52 STMR200-249 US 24, M.P. 288.74; SH 115, M. 2 R 20200723 Frontier Environmental Services, LLC 2 $568,652.50 78.43 STMR200-260 R2 - 2020 CRITICAL CULVERT 2 M 20200806 AMERICAN WEST CONSTRUCTION, LLC 1 $497,913.75 99.61 STR184B-006 CULVERTS SH 184 5 M 20200806 Lumin8 Transportation Tech. 3 $804,665.40 80.57 FSAC010-124 US 40, US 287, SH 88 1 U 20200806 APC CONSTRUCTION CO., LLC 5 $888,362.00 71.07 MTCE R100-334 ZANG STREET AND COAL CREEK YAR 1 U 20200806 STURGEON ELECTRIC COMPANY, INC 2 $2,863,242.00 108.48 SHER100-345 SIGNAL CONST PACKAGE B - 21793 1 U Colorado Department of Transportation 15:29 Friday, January 22, 2021 6 2020 Cost Data PROJECTS BID FROM 01/01/20 THROUGH 12/31/20 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20200819 SEMA CONSTRUCTION, INC. 1 $213,123.88 100.00 IM0252-498 I-25 Maintenance Region 2 Pueb 2 U 20200820 Myers and Sons Construction, LP 7 $2,348,413.60 65.23 BR2871-036 US 287 BRIDGE PREVENTATIVE MAI 2 P 20200820 KSK, LLC 3 $745,000.00 77.59 CC080-038 VARIOUS ADA RAMPS THROUGHOUT M 3 R 20200820 MORTON ELECTRIC, INC. 2 $541,906.00 108.39 SHER400-379 Signal Head Backplate Install 4 R 20200827 Lobato Construction, LLC 8 $2,200,000.00 100.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 2 R 20200901 SEMA CONSTRUCTION, INC. 1 $3,375,240.32 100.00 STM094A-038 SH94 WB PASSING LANE 2 R 20200903 JALISCO INTERNATIONAL, INC. 6 $2,184,937.00 74.20 C R100-288 R1 CURB RAMPS - PH 2 1 U 20200903 WORK ZONE TRAFFIC CONTROL, LLC 3 $459,500.00 91.91 MTCE0702-386 Grand Junction 3 M 20200903 SEMA CONSTRUCTION, INC. 7 $3,170,523.00 89.72 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 1 U 20200903 JALISCO INTERNATIONAL, INC. 5 $1,527,137.78 84.45 C088A-036 R1 ADA CURB RAMPS - 088A, 075B 1 R 20200908 American Civil Constructors West Coast, 5 $795,000.00 108.20 ER0702-406 ER I-7- Glenwood Canyon Grzly 3 M 20200917 MORTON ELECTRIC, INC. 3 $686,555.40 105.62 STM067A-040 SH 67 & KELLY RD SIGNAL IMPROV 2 U 20200917 RALPH L. WADSWORTH CONSTRUCTION CO., LLC 7 $7,975,169.43 93.74 NHPP1602-167 US 160 MP 126.4-128.19 5 M 20200917 AMERICAN WEST CONSTRUCTION, LLC 4 $244,123.00 49.28 CR400-374 FY 20 Culvert Prioritization a 4 P 20200917 SCOTT CONTRACTING INC. 6 $9,897,011.70 94.26 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 2 U 20200917 CEC Infrastructure Group, LLC 2 $2,294,975.00 100.59 SHER100-338 WWD TRAFFIC CONTROL ENHANCEMEN 1 U 20200918 RLW/SEMA, A Joint Venture 1 $35,653,936.55 104.97 NHPP0253-283 I-25 Express Lanes Segment 6 C 4 R Colorado Department of Transportation 15:29 Friday, January 22, 2021 7 2020 Cost Data PROJECTS BID FROM 01/01/20 THROUGH 12/31/20 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20201001 CC ENTRPRS TRAFFIC CONTROL SPECIALISTS 2 $1,314,765.00 87.65 MPC040-061 R2 FY 21 Sign Replacement 2 R 20201008 WORK ZONE TRAFFIC CONTROL, LLC 3 $368,907.00 76.86 MTCE0253-271 FY20 I-25 SIGN REPL PHASE 1 4 R 20201015 Western Gravel Constructors, LLC 3 $1,394,503.00 77.47 STRM331-008 ADA RAMPS WALSENBURG 2 U 20201022 MOUNTAIN VALLEY CONTRACTING, INC. 5 $2,386,292.18 65.52 CC080-030 GRAND JUNCTION RE VARIOUS CULV 3 M 20201022 MAIN ELECTRIC LTD 3 $7,992,798.87 77.17 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 5 M 20201029 Kilgore Companies, LLC dba Elam Construc 3 $10,979,498.85 91.46 NHPP 0702-390 Near MM 185 on I-70 West Vail 3 M 20201029 PAONIA, INC 6 $3,935,021.75 59.09 ITS ITSB-003 ITS FIBER ON I-76 4 P 20201103 ROCK SOLID SOLUTIONS CORPORATION 3 $1,409,512.50 47.77 NHPP0702-407 PR I-70 Glenwood Springs Grizz 3 M 20201112 INSITUFORM TECHNOLOGIES, LLC 4 $801,268.00 80.54 NHPP R100-282 I-25 Culvert on I-25 South of 1 20201112 OLDCASTLE SW GROUP, INC. 3 $5,925,401.90 84.09 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 3 M 20201112 OLDCASTLE SW GROUP, INC. 3 $5,695,942.82 91.02 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 3 M 20201112 INTERFACE COMMUNICATIONS COMPANY 3 $1,062,276.00 55.46 ITSITSB-002 ITS CV ROADSIDE UNITS 00 M 20201112 GOULD CONSTRUCTION, INC. 5 $1,659,315.00 90.14 C0702-398 I-70 GLENWOOD CANYON WALL IMPR 3 M 20201112 INTERFACE COMMUNICATIONS COMPANY 4 $525,794.00 86.80 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 1 20201119 Lumin8 Transportation Tech. 2 $8,920,376.70 104.65 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 1 M 20201119 Lumin8 Transportation Tech. 3 $371,450.00 77.65 FSA1211-098 SH 121 & 1ST AVE 1 U 20201203 A and S CONSTRUCTION CO. 5 $6,188,302.40 98.86 STR0641-104 SH64 RANGELY EAST/US 40 DINOSA 3 M Colorado Department of Transportation 15:29 Friday, January 22, 2021 8 2020 Cost Data PROJECTS BID FROM 01/01/20 THROUGH 12/31/20 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20201203 Geovert, LLC 5 $2,799,915.60 78.14 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 3 M 20201203 SCHMIDT CONSTRUCTION COMPANY 3 $2,629,495.17 93.91 IMM240-180 I-25 RAMPS IN COS RESURFACING 2 U 20201210 APC CONSTRUCTION CO., LLC 3 $4,156,493.22 70.72 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIRE 1 M 20201210 STURGEON ELECTRIC COMPANY, INC 2 $2,786,000.00 103.42 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE) 1 M 20201215 KRAEMER NORTH AMERICA, LLC 1 $9,815,943.86 100.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDGE 1 R 20201217 SCOTT CONTRACTING INC. 6 $19,500,000.00 96.82 NHPP0132-022 SH13 FORTIFICATION CREEK NORTH 3 R 20201217 KSK, LLC 6 $1,276,000.00 98.44 CR100-342 US-6 at Garrison 1 U 20201217 Kilgore Companies, LLC dba Elam Construc 5 $3,288,442.60 94.59 STA141A-051 This will be a chipseal projec 3 R 20201221 RLW/SEMA, A Joint Venture 1 $99,743,586.51 102.34 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 & 4 P ======= ================ ====== TOTALS 448 $725,666,382.56 97.17 Colorado Department of Transportation 15:29 Friday, January 22, 2021 1 2020 Cost Data BRIDGE COST PER SQUARE FOOT (01/01/20 THROUGH 12/31/20) ------------------------------------------------------------------------------------------------------------------------------------ PROJECT NUMBER/ TERR/ TOTAL TOTAL COST PER DATE LET PROJECT LOCATION BRIDGE ID LENGTH WIDTH SQUARE FT COST SQUARE FOOT ------------------------------------------------------------------------------------------------------------------------------------ BRIDGE REPAIR 200123 NH 0503-093 M US50 WEST OF TEXAS CREEK MP 25 0300 63.0000 66.6600 4199.6 $64,349 $15.32 0301 84.3300 34.0000 2867.2 $45,164 $15.75 0302 141.0000 73.5000 10363.5 $72,793 $7.02 200206 NHPP 0852-116 U US85:HAMPDEN TO FLORIDA-RESURF 0300 200.0000 120.0000 24000.0 $1,909,206 $79.55 200213 STA069A-033 M SH69 MP 58.7 TO 71.58 0300 123.3000 25.0000 3082.5 $36,358 $11.79 WEIGHTED AVERAGE COST: NEW STRUCTURES 44512.8 $2,127,869 $47.80 CONCRETE SLAB AND GIRDER 200206 STA059A-036 P SH 59 SEIBERT TO COPE 0300 120.0000 34.0000 4080.0 $530,047 $129.91 200507 FBR0343-042 P US 34 D-27-G STRUCTURE REPLACE 0300 82.5000 48.0000 3960.0 $842,133 $212.66 201112 NHPP0702-384 M I-70 FRISCO TO SILVERTHORNE 0300 69.5000 38.0000 2641.0 $214,826 $81.34 WEIGHTED AVERAGE COST: NEW STRUCTURES 10681.0 $1,587,005 $148.58 CONCRETE SLAB BRIDGE 200227 STR0101-027 P SH 10 Overlay La Junta West 0300 32.0000 41.0000 1312.0 $43,017 $32.79 WEIGHTED AVERAGE COST: NEW STRUCTURES 1312.0 $43,017 $32.79 PRESTRES GIRDER (BOX SECTION) 200116 BR0343-040 P US 34 REPUBLICAN RIVER BRIDGES 0300 115.5000 43.0000 4966.5 $1,026,755 $206.74 200116 FBR0343-043 P US 34 D-28-P STRUCTURE REPLACE 0300 128.5000 43.0000 5525.5 $1,230,872 $222.76 WEIGHTED AVERAGE COST: NEW STRUCTURES 10492.0 $2,257,627 $215.18 Colorado Department of Transportation 15:29 Friday, January 22, 2021 2 2020 Cost Data BRIDGE COST PER SQUARE FOOT (01/01/20 THROUGH 12/31/20) ------------------------------------------------------------------------------------------------------------------------------------ PROJECT NUMBER/ TERR/ TOTAL TOTAL COST PER DATE LET PROJECT LOCATION BRIDGE ID LENGTH WIDTH SQUARE FT COST SQUARE FOOT ------------------------------------------------------------------------------------------------------------------------------------ MAJOR STRUCTURE CBC OR PIPES 200917 NHPP1602-167 M US 160 MP 126.4-128.19 0300 100.0000 100.0000 10000.0 $1,354,947 $135.49 WEIGHTED AVERAGE COST: NEW STRUCTURES 10000.0 $1,354,947 $135.49 TIMBER BRIDGE (GLUELAM) 200827 BR101A-004 R SH 101 (MP 19.35)(MP 19.98) 0300 29.0000 25.0000 725.0 $307,204 $423.73 WEIGHTED AVERAGE COST: NEW STRUCTURES 725.0 $307,204 $423.73 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 1 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 201-00000 Clear and Grub LUMP SUM =============================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 1.00 15000.00 30509.00 20000.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 1.00 7500.00 30000.00 30000.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 1.00 12500.00 55801.76 13596.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 1.00 5000.00 33000.00 15000.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 1.00 10000.00 24614.17 5200.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1.00 26000.00 55750.00 75000.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1.00 320000.00 319725.00 115000.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1.00 5000.00 18160.00 22320.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1.00 9000.00 17463.60 4818.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9.00 45555.56 95841.81 33437.11 IM0761-226 I76/SH52 Interchange 04/02/20 1.00 50000.00 144432.86 29999.99 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 1.00 25000.00 9670.00 18100.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 1.00 60000.00 37500.00 25000.00 SFTY2254-091 225 Ramp Improvements 04/09/20 1.00 20000.00 33000.00 59000.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 37500.00 240540.56 166399.60 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 1.00 10000.00 83700.00 146100.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 1.00 18000.00 22367.50 15100.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 1.00 8000.00 11290.31 870.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1.00 142000.00 159773.52 159773.52 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 1.00 40000.00 36097.25 35000.00 NH050A-037 US 50A Pueblo Regional Pond SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 1.00 21000.00 5248.20 2541.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 11.00 39227.27 80881.36 59807.65 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 1.00 25000.00 21459.01 23754.03 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 1.00 3000.00 6876.00 16000.00 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 1.00 9600.00 7750.00 3500.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 1.00 50000.00 13000.00 3000.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 1.00 10000.00 20000.00 10000.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 1.00 13873.01 13873.01 13873.01 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1.00 5000.00 52857.14 135000.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 1.00 30000.00 76555.55 100000.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 1.00 16798.00 8383.00 2750.00 CR400-374 FY 20 Culvert Prioritization 09/17/20 1.00 6000.00 5532.00 4500.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 2313532.59 100149.69 100149.69 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 11.00 225709.42 34159.75 37502.43 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 2 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 201-00000 Clear and Grub LUMP SUM =============================================== STRM331-008 ADA RAMPS WALSENBURG 10/15/20 1.00 12655.00 13166.67 10000.00 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 1.00 50000.00 41115.00 98725.00 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 1.00 30000.00 33230.00 4690.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 1.00 40000.00 31053.33 20000.00 C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 1.00 20000.00 64260.51 10100.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 1.00 10000.00 13247.00 8000.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 1.00 5000.00 44000.00 48000.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1.00 12915.00 12915.00 12915.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 1.00 50000.00 134773.31 147569.85 CR100-342 US-6 at Garrison 12/17/20 1.00 20000.00 14950.00 15000.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1.00 6595769.18 209316.40 209316.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 11.00 622394.47 50850.84 53119.66 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 42.00 242158.16 66015.11 46563.36 =============== 201-00001 Clear and Grub Acre =================================================== PWQM240-172 El Paso County, north Colorad 01/23/20 4.00 6250.00 21150.00 18300.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 157.00 1000.00 820.85 957.54 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 13.00 8000.00 1602.61 1010.53 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 1.00 10000.00 26161.56 3106.92 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 175.00 1691.43 1524.64 1370.16 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 1.10 5000.00 5000.00 5000.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 22.00 10000.00 3663.68 605.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 23.10 9761.90 3674.73 814.29 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 198.10 2632.51 1968.26 1305.34 =============== 201-00005 Rem of Debris LUMP SUM =============================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 1.00 5000.00 13834.15 23656.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 1.00 15000.00 27500.00 25000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 10000.00 19300.49 24328.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 3 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 201-00005 Rem of Debris LUMP SUM =============================================== CR400-374 FY 20 Culvert Prioritization 09/17/20 1.00 3000.00 5734.50 4500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 3000.00 5734.50 4500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 7666.67 13271.16 17718.67 =============== 201-00007 Rem of Debris Each =================================================== STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 1.00 600.00 270.00 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 600.00 270.00 250.00 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 9.00 5000.00 4030.00 3590.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9.00 5000.00 4030.00 3590.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 4560.00 3770.69 3256.00 =============== 202-00000 Rem Str and Obstructions LUMP SUM =============================================== PWQM240-172 El Paso County, north Colorad 01/23/20 1.00 5000.00 10250.00 7500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 5000.00 10250.00 7500.00 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 1.00 40000.00 11833.33 10000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 40000.00 11833.33 10000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 22500.00 11200.00 8750.00 =============== 202-00001 Rem Structure Each =================================================== NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 2.00 2000.00 2623.57 2623.57 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 2000.00 2623.57 2623.57 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 4 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00001 Rem Structure Each =================================================== C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 4.00 2500.00 2123.39 2566.96 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 2.00 100.00 1587.31 734.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 2.00 1485.07 2602.35 2602.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 1646.27 1962.36 2117.57 CR100-342 US-6 at Garrison 12/17/20 4.00 1500.00 1221.67 1500.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 18.00 1635.83 2295.78 2295.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 22.00 1611.13 1682.00 2151.09 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 32.00 1644.22 1828.35 2172.24 =============== 202-00002 Rem of Structure (Spec) Each =================================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 5000.00 5017.45 950.30 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 5000.00 5017.45 950.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5000.00 5017.45 950.30 =============== 202-00003 Rem of Structure (Spec) LUMP SUM =============================================== NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1.00 39000.00 37614.04 37614.04 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 39000.00 37614.04 37614.04 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 39000.00 37614.04 37614.04 =============== 202-00008 Tree Trimming Hour =================================================== NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 8.00 300.00 90.73 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 300.00 90.73 150.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 5 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00008 Tree Trimming Hour =================================================== FSAC010-124 US 40, US 287, SH 88 08/06/20 8.00 250.00 241.67 225.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 250.00 241.67 225.00 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 8.00 250.00 368.00 212.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 4.00 310.00 260.00 170.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 12.00 270.00 346.40 198.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 28.00 272.86 234.99 192.00 =============== 202-00009 Tree Trimming LUMP SUM =============================================== NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 1.00 3000.00 5975.00 5975.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 3000.00 5975.00 5975.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 3000.00 5975.00 5975.00 =============== 202-00010 Rem Tree Each =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 4.00 300.00 750.00 750.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 9.00 750.00 779.03 1060.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 1.00 500.00 1192.00 150.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 1.00 1000.00 2050.00 2500.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 3.00 250.00 759.50 1000.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1.00 350.00 2122.00 1700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 19.00 555.26 893.25 1046.84 IM0761-226 I76/SH52 Interchange 04/02/20 9.00 500.00 457.00 540.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 71.00 320.00 760.94 445.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 6 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00010 Rem Tree Each =================================================== FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 1.00 800.00 2515.67 537.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 1.00 350.00 833.23 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 82.00 345.98 740.36 465.76 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 2.00 250.00 270.00 250.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 1.00 350.00 1576.67 1000.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 7.00 450.00 844.93 1000.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 3.00 901.79 1345.28 1345.28 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 13.00 515.80 868.60 964.30 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 5.00 300.00 616.67 750.00 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 21.00 400.00 630.60 165.00 C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 8.00 1000.00 509.32 403.00 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 10.00 300.00 257.25 529.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 164.00 398.93 417.94 417.94 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 208.00 415.02 479.86 405.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 322.00 409.78 677.53 481.02 =============== 202-00015 Rem Headwall Each =================================================== NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 1.00 1400.00 750.00 750.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 2.00 1500.00 3027.48 1586.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 1466.67 2571.98 1307.33 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 17.00 2500.00 824.69 401.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 3.00 2000.00 2259.07 2259.07 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20.00 2425.00 855.65 680.14 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1.00 2500.00 2136.29 2000.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 7 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00015 Rem Headwall Each =================================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 5.00 1749.68 2291.45 2291.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 1874.73 2200.94 2242.88 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 28.00 375.00 857.50 478.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 3.00 1965.56 2311.96 2311.96 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 31.00 528.93 883.02 655.48 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 60.00 1342.42 945.57 855.03 =============== 202-00019 Rem Inlet Each =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 2.00 800.00 1300.00 1300.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 4.00 2000.00 1558.33 2000.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 8.00 1000.00 1082.67 1600.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 3.00 1100.00 1777.00 1121.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1.00 1245.00 2008.00 1028.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 18.00 1230.28 1250.48 1543.94 IM0761-226 I76/SH52 Interchange 04/02/20 5.00 1200.00 1121.16 938.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 2.00 1000.00 1379.24 2750.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7.00 1142.86 1202.13 1455.71 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 3.00 1200.00 1700.00 1900.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 3.00 1000.00 1531.43 1500.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 1.00 1000.00 1333.47 1930.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 2.00 874.85 1301.18 1301.18 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9.00 1038.86 1513.23 1636.93 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 3.00 4000.00 1266.67 1500.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 8 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00019 Rem Inlet Each =================================================== NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 1.00 1000.00 1889.00 1378.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1.00 987.00 987.00 987.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 27.00 1031.61 1293.58 1293.58 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 32.00 1307.51 1310.04 1305.99 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 66.00 1232.35 1292.79 1431.89 =============== 202-00020 Rem CBC Each =================================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 9.00 10000.00 6883.54 1782.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 9.00 10000.00 6883.54 1782.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 2.00 40000.00 21318.33 7130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 40000.00 21318.33 7130.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 15454.55 8945.65 2754.36 =============== 202-00021 Rem Manhole Each =================================================== PWQM240-172 El Paso County, north Colorad 01/23/20 1.00 2500.00 1291.50 1283.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1.00 1500.00 1920.00 1500.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 4.00 1200.00 1400.01 1500.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1.00 1200.00 3280.43 740.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7.00 1428.57 1530.87 1360.43 IM0761-226 I76/SH52 Interchange 04/02/20 1.00 1000.00 1209.13 1177.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 1000.00 1209.13 1177.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 1500.00 1605.00 1605.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1500.00 1605.00 1605.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 1388.89 1484.53 1367.22 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 9 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00022 Rem Headgate Each =================================================== NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 4.00 1371.22 986.25 986.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 1371.22 986.25 986.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 1371.22 986.25 986.25 =============== 202-00023 Rem Emb Prot Ty 3 Each =================================================== NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 2.00 1000.00 801.99 801.99 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 1000.00 801.99 801.99 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1000.00 801.99 801.99 =============== 202-00024 Rem Emb Prot Ty 5 Each =================================================== IM0761-226 I76/SH52 Interchange 04/02/20 4.00 500.00 521.32 489.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 500.00 521.32 489.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 4.00 500.00 922.41 595.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 500.00 922.41 595.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 500.00 706.44 542.00 =============== 202-00025 Rem Ditch Lining Lin Foot =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 544.00 7.62 11.62 11.62 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 544.00 7.62 11.62 11.62 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 4,882.00 9.87 7.76 7.76 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,882.00 9.87 7.76 7.76 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,426.00 9.64 8.15 8.15 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 10 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00026 Rem S and D Pave Sq Yard ================================================ FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 402.00 25.00 27.42 25.00 STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 45.50 40.00 130.00 130.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 109.00 18.50 16.63 36.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 556.50 24.95 25.18 35.74 SFTY2254-091 225 Ramp Improvements 04/09/20 2,141.00 40.00 25.50 33.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,141.00 40.00 25.50 33.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 586.00 10.49 22.17 22.17 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 586.00 10.49 22.17 22.17 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 431.00 19.17 19.17 19.17 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 2,214.00 12.79 14.16 14.16 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,645.00 13.83 14.98 14.98 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,928.50 23.99 22.34 24.15 =============== 202-00027 Rem Riprap Sq Yard ================================================ FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 43.00 20.00 32.00 32.00 PWQM240-172 El Paso County, north Colorad 01/23/20 121.00 25.00 40.50 59.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 3.00 250.00 727.70 1818.10 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 12.00 100.00 74.67 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 179.00 32.60 61.86 87.43 SFTY2254-091 225 Ramp Improvements 04/09/20 26.00 75.00 57.50 89.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 26.00 75.00 57.50 89.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 11 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00027 Rem Riprap Sq Yard ================================================ NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 309.00 45.00 26.20 13.76 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 309.00 45.00 26.20 13.76 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 3,572.00 18.54 22.79 22.79 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,572.00 18.54 22.79 22.79 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,086.00 21.52 26.41 25.36 =============== 202-00029 Rem Gabion Cubic Yard ============================================= STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 78.00 50.00 68.00 61.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 78.00 50.00 68.00 61.00 C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 100.00 80.00 376.21 154.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 100.00 80.00 376.21 154.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 178.00 66.85 302.92 113.25 =============== 202-00030 Rem Water Service Each =================================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 2000.00 2207.42 3217.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1.00 7000.00 2136.54 2136.54 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 4500.00 2199.55 2677.02 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 3145.28 1513.75 1513.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 3145.28 1513.75 1513.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 4048.43 2130.97 2289.26 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 12 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00031 Rem of Fire Hydrant Each =================================================== IM0761-226 I76/SH52 Interchange 04/02/20 1.00 2000.00 1436.01 1611.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 2000.00 1436.01 1611.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2000.00 1436.01 1611.00 =============== 202-00032 Rem Valve Each =================================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 959.04 975.19 975.19 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 959.04 975.19 975.19 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 959.04 975.19 975.19 =============== 202-00033 Rem Pipe Each =================================================== NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 2.00 2000.00 1500.00 1500.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 9.00 2000.00 3236.67 7000.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 11.00 2500.00 4249.25 2300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 22.00 2250.00 3968.58 4150.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 22.00 2250.00 3968.58 4150.00 =============== 202-00035 Rem Pipe Lin Foot =============================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 420.00 20.00 21.00 21.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 620.00 20.00 22.41 13.00 PWQM240-172 El Paso County, north Colorad 01/23/20 377.00 35.00 29.50 27.00 STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 42.00 50.00 120.00 120.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 76.00 30.00 82.83 48.48 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 20.00 30.00 122.17 190.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1,014.00 22.00 40.45 56.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 375.00 30.00 83.70 17.60 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 61.00 35.00 55.00 42.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,005.00 24.85 40.83 35.12 IM0761-226 I76/SH52 Interchange 04/02/20 776.00 28.00 25.58 18.99 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 13 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00035 Rem Pipe Lin Foot =============================================== STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 134.00 25.00 27.13 37.00 SFTY2254-091 225 Ramp Improvements 04/09/20 3.00 50.00 297.50 295.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 656.00 25.00 42.95 13.20 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 2,953.00 30.48 33.48 33.48 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4,522.00 29.11 33.90 28.33 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 50.00 51.00 44.00 70.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 91.00 53.47 53.47 53.47 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 291.00 35.00 36.00 35.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 938.00 10.00 28.34 34.50 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 321.00 30.00 25.78 7.35 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1,112.00 28.96 35.47 35.47 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,803.00 24.55 30.33 33.08 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 34.00 22.00 66.50 83.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 6.00 96.60 96.60 96.60 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 1,339.00 30.00 33.35 38.40 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 8,237.00 25.10 29.62 29.62 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9,616.00 25.82 31.63 31.07 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19,946.00 26.24 34.08 31.34 =============== 202-00036 Rem of Pipe (Spec) Lin Foot =============================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 183.00 5.00 19.83 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 183.00 5.00 19.83 35.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1,133.00 44.61 52.70 52.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,133.00 44.61 52.70 52.70 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 945.00 49.36 52.81 52.81 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 945.00 49.36 52.81 52.81 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,261.00 43.39 45.87 51.32 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 14 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00037 Rem of End Section Each =================================================== STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 1.00 650.00 2200.00 2200.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 1.00 300.00 405.77 480.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 7.00 200.00 493.33 580.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 20.00 280.00 317.50 550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 29.00 274.14 348.76 611.72 IM0761-226 I76/SH52 Interchange 04/02/20 15.00 300.00 347.32 231.01 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 14.00 590.00 359.36 198.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 4.00 568.00 878.16 878.16 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 33.00 455.52 363.03 295.45 STM094A-038 SH94 WB PASSING LANE 09/01/20 2.00 326.83 326.83 326.83 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 3.00 500.00 440.71 200.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 11.00 730.30 899.31 899.31 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 16.00 636.69 582.38 696.63 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 4.00 264.60 264.60 264.60 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 53.00 654.75 476.67 476.67 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 57.00 627.37 461.79 461.79 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 135.00 510.59 384.12 481.17 =============== 202-00039 Rem of Bollard Each =================================================== STRR300-249 Grand and Jackson Counties AD 03/05/20 1.00 700.00 776.67 180.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 2.00 100.00 441.67 270.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 300.00 553.33 240.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 1.00 300.00 1095.00 1800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 300.00 1095.00 1800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 300.00 688.75 630.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 15 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00047 Rem Elec Equipment LUMP SUM =============================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 1.00 5750.00 12600.00 1500.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 1.00 5000.00 6204.75 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 5375.00 8945.57 2000.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 2000.00 5638.05 5500.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 2000.00 5638.05 5500.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 1.00 125000.00 98500.00 75000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 125000.00 98500.00 75000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 34437.50 17924.91 21125.00 =============== 202-00055 Rem of FO Cable Lin Foot =============================================== IM0761-226 I76/SH52 Interchange 04/02/20 5,450.00 1.00 2.10 1.29 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,450.00 1.00 2.10 1.29 STM094A-038 SH94 WB PASSING LANE 09/01/20 2,450.00 2.42 2.42 2.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,450.00 2.42 2.42 2.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,900.00 1.44 2.12 1.64 =============== 202-00060 Rem Trav Time Indicator Each =================================================== ITSITSB-002 ITS CV ROADSIDE UNITS 11/12/20 75.00 1000.00 230.33 111.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 75.00 1000.00 230.33 111.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 75.00 1000.00 230.33 111.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 16 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00070 Rem Barricade Each =================================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 2.00 900.00 691.95 605.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 900.00 691.95 605.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 900.00 691.95 605.00 =============== 202-00090 Rem Delineator Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 100.00 6.00 5.23 5.50 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 21.00 10.00 27.62 8.60 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 100.00 15.00 5.25 5.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 300.00 10.00 3.58 3.15 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 5.00 5.00 15.78 13.25 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 176.00 10.00 5.50 5.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 650.00 7.00 8.89 9.90 FSA2873-194 US 287 Longmont Intersection 02/13/20 6.00 10.00 29.50 22.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 396.00 8.00 4.59 6.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 450.00 7.00 6.22 5.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 272.00 9.50 5.36 5.70 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 861.00 4.00 6.79 6.06 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 565.00 10.00 8.00 8.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 44.00 10.00 8.43 10.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 9.00 8.77 35.88 17.19 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 150.00 10.00 8.10 12.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 200.00 7.00 6.05 2.25 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 15.00 28.00 34.00 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,320.00 7.76 7.20 6.71 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 586.00 7.50 4.88 7.58 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 550.00 7.00 7.45 9.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 17.00 10.00 5.25 5.00 SFTY2254-091 225 Ramp Improvements 04/09/20 26.00 10.00 31.50 31.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 160.00 25.00 7.12 4.40 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 20.00 20.00 23.33 27.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 24.00 20.00 34.19 30.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 18.00 15.00 67.00 60.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 90.00 16.00 16.21 16.21 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 17 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00090 Rem Delineator Each =================================================== SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 12.00 10.00 29.02 22.58 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,503.00 10.24 9.07 10.02 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 9.00 10.00 52.50 65.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 9.00 9.40 20.99 30.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 11.00 5.35 5.35 5.35 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 14.00 35.00 78.14 15.72 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 151.00 10.00 7.57 5.85 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 99.00 20.00 9.73 7.35 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 4.00 60.00 70.83 20.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 11.00 20.00 27.16 27.16 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 308.00 15.17 12.68 10.14 MPC040-061 R2 FY 21 Sign Replacement 10/01/20 1.00 23.34 7.50 5.00 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 200.00 15.00 15.55 14.64 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 463.00 15.00 17.87 20.10 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 130.00 15.00 8.67 12.40 CR100-342 US-6 at Garrison 12/17/20 12.00 15.00 113.25 5.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 600.00 16.15 17.28 17.28 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,406.00 15.50 17.26 17.27 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,537.00 10.00 9.63 9.48 =============== 202-00120 Rem CBC Lin Foot =============================================== NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 60.00 50.00 176.50 63.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 338.00 78.16 109.75 109.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 398.00 73.91 127.24 102.70 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 398.00 73.91 127.24 102.70 =============== 202-00150 Rem Wall Each =================================================== STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 1.00 8000.00 2950.00 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 8000.00 2950.00 2000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 8000.00 2950.00 2000.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 18 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00155 Rem Wall Lin Foot =============================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 25.00 200.00 16.00 16.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 56.00 60.00 97.54 100.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC PWQM240-172 El Paso County, north Colorad 01/23/20 81.00 50.00 110.50 190.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 20.00 100.00 69.58 140.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 157.00 200.00 100.20 104.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 339.00 135.13 97.89 119.52 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 59.00 50.00 125.00 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 59.00 50.00 125.00 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 398.00 122.51 100.04 109.22 =============== 202-00160 Rem Wall Sq Foot ================================================ C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 66.00 60.00 71.50 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 66.00 60.00 71.50 25.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 66.00 60.00 71.50 25.00 =============== 202-00170 Grinding And Texturing Conc Pvmt Sq Yard ================================================ NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 85.00 42.00 167.33 258.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 72,316.00 9.00 5.50 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 72,401.00 9.04 5.78 5.30 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 119.00 100.00 29.03 26.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 119.00 100.00 29.03 26.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 72,520.00 9.19 5.84 5.33 =============== 202-00190 Rem of Conc Median Cover Matl Sq Yard ================================================ FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 55.00 21.00 22.00 22.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 19 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00190 Rem of Conc Median Cover Matl Sq Yard ================================================ NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 44.50 24.00 41.23 47.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 88.00 30.00 25.12 34.20 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1,519.00 20.00 9.75 14.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 723.00 14.00 19.23 14.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,429.50 18.67 11.36 15.79 IM0761-226 I76/SH52 Interchange 04/02/20 327.00 20.00 9.79 2.01 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 34.00 22.00 348.18 40.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 50.00 22.00 31.53 40.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 46.00 25.00 78.00 108.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 12.00 40.00 66.33 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 469.00 21.36 46.79 20.31 STMM086-083 ADA PUEBLO METRO 07/09/20 306.00 15.00 27.50 25.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 437.00 35.00 28.00 35.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 59.00 25.00 22.93 11.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 4,147.00 7.00 10.01 4.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,949.00 10.18 11.20 8.66 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 50.00 20.00 60.00 45.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 200.00 25.00 40.00 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 250.00 24.00 45.45 41.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,097.50 13.80 13.99 12.47 =============== 202-00195 Rem of Median Cover Sq Yard ================================================ NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 48.00 60.00 67.33 55.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1,540.00 10.00 9.48 15.10 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 65.00 25.00 34.00 56.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,653.00 12.04 12.69 17.87 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 20 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00195 Rem of Median Cover Sq Yard ================================================ FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 83.00 25.00 45.00 16.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 24.00 60.00 67.17 58.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 108.00 50.00 35.76 20.79 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 215.00 41.47 41.06 23.09 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 5.00 56.00 61.25 57.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 106.00 18.00 40.00 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 111.00 19.71 41.83 40.77 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,979.00 15.67 17.73 19.72 =============== 202-00200 Rem Sidewalk Sq Yard ================================================ FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 161.00 26.00 22.00 22.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 758.50 23.00 27.40 28.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 520.00 23.00 18.57 20.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 21.40 60.00 80.00 30.00 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 2.00 100.00 227.00 75.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 31.00 30.00 44.60 101.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 42.00 30.00 41.99 24.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 202.00 25.00 39.00 47.00 STRR300-249 Grand and Jackson Counties AD 03/05/20 1,228.00 40.00 53.00 39.00 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 443.00 40.00 41.17 23.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 490.00 40.00 10.00 10.50 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 301.00 32.00 12.94 22.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 457.00 19.00 23.10 15.20 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 222.00 35.00 26.60 17.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,878.90 31.74 29.67 26.68 IM0761-226 I76/SH52 Interchange 04/02/20 278.00 40.00 12.74 5.50 C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 110.00 18.00 32.20 43.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 663.00 35.00 61.00 55.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 21 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00200 Rem Sidewalk Sq Yard ================================================ NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 124.00 35.00 45.33 41.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 10.00 100.00 138.25 183.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 25.00 22.00 45.27 100.00 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 2.00 25.00 576.70 250.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 77.00 50.00 49.00 47.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 13.00 50.00 41.35 20.77 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,302.00 35.90 40.00 43.42 STMM086-083 ADA PUEBLO METRO 07/09/20 2,297.00 15.00 25.00 20.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 157.00 30.00 35.00 35.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 139.00 30.00 42.73 38.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 1,306.00 40.00 26.00 29.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 3,636.00 28.00 31.17 40.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 1,502.00 32.00 32.22 41.11 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 229.00 25.00 20.11 13.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 147.00 30.00 18.25 11.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 250.00 50.00 26.14 32.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9,663.00 27.74 29.55 32.54 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 1,726.00 30.00 23.00 19.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 93.00 40.00 83.33 85.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 31.00 50.00 48.50 40.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 287.00 32.00 34.50 37.00 CR100-342 US-6 at Garrison 12/17/20 2,404.00 25.00 30.50 26.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,541.00 27.82 29.55 25.34 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20,384.90 29.24 30.20 30.23 =============== 202-00201 Rem Curb Lin Foot =============================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 206.00 7.00 7.00 7.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 925.00 8.00 7.26 11.50 STRR300-249 Grand and Jackson Counties AD 03/05/20 106.00 25.00 45.33 15.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 946.00 15.00 6.10 7.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,183.00 11.76 9.16 9.45 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 220.00 11.00 8.78 11.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 22 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00201 Rem Curb Lin Foot =============================================== NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 88.00 10.00 20.00 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 308.00 10.71 11.99 11.57 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 109.00 15.00 12.61 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 109.00 15.00 12.61 14.00 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 58.00 20.00 18.33 15.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 4,254.00 10.00 10.79 14.25 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 242.00 9.00 12.50 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,554.00 10.07 10.95 14.19 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,154.00 10.69 10.60 12.63 =============== 202-00202 Rem Gutter Lin Foot =============================================== STRR300-249 Grand and Jackson Counties AD 03/05/20 21.00 20.00 61.00 31.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 688.00 10.00 6.52 9.25 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 54.00 16.00 20.73 5.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 763.00 10.70 8.74 9.61 IM0761-226 I76/SH52 Interchange 04/02/20 134.00 15.00 9.61 10.50 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 113.00 30.00 53.00 44.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 247.00 21.86 21.13 25.83 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 522.00 20.00 22.33 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 522.00 20.00 22.33 15.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,532.00 15.67 16.05 14.06 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 23 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00203 Rem Curb and Gutter Lin Foot =============================================== NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 355.00 30.00 19.67 14.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 271.00 9.00 9.00 9.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 2,062.00 17.00 11.60 12.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 538.00 15.00 12.22 9.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 63.90 20.00 20.00 10.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 141.00 20.00 18.16 10.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 159.00 20.00 21.00 15.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 901.00 11.00 9.89 12.00 STRR300-249 Grand and Jackson Counties AD 03/05/20 2,512.00 20.00 23.67 15.00 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 843.00 35.00 20.77 15.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 6,287.00 10.00 5.35 7.25 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 3,930.00 9.00 5.88 6.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 3,126.00 8.00 5.65 6.50 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 743.00 17.00 16.50 10.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 21,931.90 13.18 9.50 9.11 IM0761-226 I76/SH52 Interchange 04/02/20 2,737.00 10.00 4.53 1.70 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 145.00 15.00 11.70 14.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 651.00 10.00 12.37 15.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 828.00 15.00 50.33 44.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 163.00 20.00 23.00 7.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 200.00 14.00 21.83 15.50 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 100.00 15.00 49.17 30.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 569.00 5.00 7.52 7.52 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 35.00 40.00 31.33 21.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 272.00 15.00 14.71 11.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,700.00 11.29 11.22 11.98 STMM086-083 ADA PUEBLO METRO 07/09/20 3,627.00 10.00 17.50 15.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 2,204.00 15.00 13.50 17.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 156.00 16.00 15.77 15.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 2,133.00 20.00 15.33 18.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 5,026.00 14.00 18.33 23.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 3,785.00 12.00 17.18 17.91 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1,044.00 15.00 10.12 10.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 9,461.00 10.00 4.17 2.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 24 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00203 Rem Curb and Gutter Lin Foot =============================================== STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 560.00 34.00 14.21 15.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 27,996.00 12.84 11.28 12.64 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 2,284.00 20.00 18.33 15.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 421.00 20.00 23.00 27.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 8.00 10.50 26.88 23.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 693.00 16.00 13.00 14.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 42.00 13.65 13.65 13.65 CR100-342 US-6 at Garrison 12/17/20 1,505.00 10.00 14.50 14.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 3,488.00 9.87 6.91 6.91 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8,441.00 13.66 14.90 12.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 64,068.90 12.93 11.00 11.29 =============== 202-00205 Rem Wheel Stop Each =================================================== FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 1.00 150.00 760.00 92.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 150.00 760.00 92.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 150.00 760.00 92.00 =============== 202-00206 Rem Conc Curb Ramp Sq Yard ================================================ NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 216.00 50.00 58.67 33.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 94.00 45.00 32.00 32.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 814.00 41.00 35.00 29.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 91.00 45.00 34.32 25.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 78.00 40.00 28.00 16.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 28.00 40.00 57.48 28.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 50.00 48.00 29.83 34.95 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 76.00 40.00 35.17 58.50 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 85.00 40.00 34.00 26.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,532.00 42.81 38.34 30.32 IM0761-226 I76/SH52 Interchange 04/02/20 43.00 50.00 27.57 15.99 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 25 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00206 Rem Conc Curb Ramp Sq Yard ================================================ C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 102.00 24.00 35.20 40.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 440.00 50.00 56.67 42.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 83.00 40.00 42.00 41.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 51.00 50.00 49.50 44.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 111.00 35.00 41.96 20.79 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 830.00 43.80 46.88 37.59 STMM086-083 ADA PUEBLO METRO 07/09/20 2,817.00 25.00 30.00 20.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 155.00 50.00 56.00 70.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 98.00 40.00 47.17 42.50 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 60.00 40.00 32.79 30.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 44.00 40.00 33.05 16.20 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 167.00 50.00 30.57 45.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,341.00 28.32 32.07 24.38 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 92.00 50.00 100.00 95.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 130.00 45.00 46.75 40.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 221.00 40.00 36.00 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 443.00 43.54 54.78 51.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,146.00 35.12 38.24 29.60 =============== 202-00207 Rem of Brick Pavers Sq Yard ================================================ STRR300-249 Grand and Jackson Counties AD 03/05/20 659.00 35.00 14.67 17.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 47.00 50.00 53.67 28.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 706.00 36.00 17.26 17.73 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 3.00 50.00 91.40 29.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 50.00 91.40 29.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 78.00 40.00 21.38 16.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 78.00 40.00 21.38 16.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 787.00 36.45 18.43 17.66 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 26 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00210 Rem Conc Pavement Sq Yard ================================================ FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 100.00 40.00 99.33 85.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 599.00 17.50 30.17 32.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 59.00 40.00 93.93 55.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 6,227.00 40.00 55.00 55.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 737.00 40.00 30.60 30.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 1,285.00 22.00 27.47 22.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 38.00 60.00 75.00 105.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 7,708.00 12.00 9.58 10.31 STRR300-249 Grand and Jackson Counties AD 03/05/20 389.00 40.00 68.33 41.00 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 53.00 35.00 38.26 27.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 52.00 30.00 43.46 80.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 2,316.00 20.00 24.25 34.40 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 339.00 40.00 64.00 32.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 19,902.00 24.99 32.19 31.12 IM0761-226 I76/SH52 Interchange 04/02/20 12,213.00 18.00 11.26 9.20 SFTY2254-091 225 Ramp Improvements 04/09/20 1,184.00 35.00 49.00 46.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 27,207.00 12.00 6.80 4.61 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1601-082 Hawkins Signal and Curb Ramps 04/30/20 417.00 40.00 68.67 45.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 24.00 100.00 69.67 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 41,045.00 14.78 8.64 7.61 STMM086-083 ADA PUEBLO METRO 07/09/20 1,265.00 25.00 38.50 25.00 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 1,134.00 20.00 16.17 12.85 FSAC010-124 US 40, US 287, SH 88 08/06/20 45.00 40.00 43.00 45.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 441.00 60.00 85.57 80.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 64.00 35.00 28.33 22.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 81.00 35.00 52.00 50.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 273.00 40.00 39.31 47.55 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 808.00 35.00 34.30 25.00 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 35.00 35.00 791.00 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,146.00 30.89 45.39 30.14 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 430.00 40.00 32.00 20.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 27 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00210 Rem Conc Pavement Sq Yard ================================================ NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 139.00 45.00 51.00 42.00 CR100-342 US-6 at Garrison 12/17/20 175.00 20.00 38.50 28.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 12,051.00 9.32 9.60 9.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 12,795.00 10.88 14.42 10.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 77,888.00 17.61 13.68 15.30 =============== 202-00212 Rem Conc Pavement (Spec) Sq Yard ================================================ STR2871-038 US 287 Passing Lanes Springfi 03/05/20 7,389.00 15.00 16.39 17.29 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7,389.00 15.00 16.39 17.29 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1,241.00 19.59 21.45 21.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,241.00 19.59 21.45 21.45 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 1,212.00 75.00 40.33 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,212.00 75.00 40.33 20.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,842.00 22.97 21.14 18.15 =============== 202-00215 Rem Conc Pvmt (Planing) Sq Yard ================================================ NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 450.00 28.00 19.43 21.38 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 450.00 28.00 19.43 21.38 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 119.00 12.00 37.90 51.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 119.00 12.00 37.90 51.70 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 569.00 24.65 23.29 27.72 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 28 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00217 Rem Conc Pvmt (Planing) (Spec) Sq Yard ================================================ BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 1,202.00 39.27 51.29 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,202.00 39.27 51.29 25.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,202.00 39.27 51.29 25.00 =============== 202-00220 Rem Asphalt Mat Sq Yard ================================================ FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 950.00 12.00 25.44 15.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 3,027.00 10.00 8.00 8.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 10,697.00 5.00 16.83 5.50 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 5,774.00 7.00 6.30 4.75 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STA006A-067 SH 6 Merino to Atwood 01/16/20 1,000.00 8.00 4.30 3.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 3,474.00 10.00 9.00 10.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 2,219.00 6.00 36.00 35.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 1,043.00 8.00 22.86 11.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 2,427.00 8.00 9.06 9.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 213.00 25.00 34.00 37.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 244.00 25.00 59.00 59.00 STRR300-249 Grand and Jackson Counties AD 03/05/20 757.00 50.00 46.00 20.00 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 28.00 50.00 27.03 8.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 3,226.00 4.00 11.75 17.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1,482.00 7.00 27.03 26.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 3,568.00 7.00 14.30 14.90 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 741.00 12.00 40.50 21.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 40,870.00 8.01 15.32 11.59 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 3,733.00 8.00 6.43 3.25 IM0761-226 I76/SH52 Interchange 04/02/20 22,279.00 7.00 5.33 3.70 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 210.00 10.00 21.62 21.00 SFTY2254-091 225 Ramp Improvements 04/09/20 669.00 25.00 25.50 19.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 51,570.00 8.00 4.73 7.19 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1601-082 Hawkins Signal and Curb Ramps 04/30/20 48.00 30.00 128.67 310.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 10,648.00 6.00 18.17 14.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 9,048.00 7.00 5.40 5.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 125.00 50.00 48.00 55.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 2,267.00 6.50 7.02 8.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 170.00 9.00 20.27 25.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 29 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00220 Rem Asphalt Mat Sq Yard ================================================ NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 15,851.00 3.70 3.23 3.23 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 27.00 65.00 51.50 60.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 233.00 25.00 42.64 31.19 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 116,878.00 7.14 5.75 6.68 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 618.00 8.00 21.13 22.00 STMM086-083 ADA PUEBLO METRO 07/09/20 1,558.00 13.00 50.50 25.00 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 36.00 44.00 31.33 57.00 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 42.00 20.00 73.00 36.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 1,047.00 30.00 35.00 35.00 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 5,555.00 6.00 11.48 3.90 FSAC010-124 US 40, US 287, SH 88 08/06/20 93.00 35.00 56.67 54.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 125.00 50.00 33.67 6.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 2,562.00 14.53 10.53 6.90 STM094A-038 SH94 WB PASSING LANE 09/01/20 5,005.00 10.34 10.34 10.34 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 1,117.00 35.00 35.33 30.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 798.00 25.00 32.02 30.12 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 3,736.00 13.00 8.55 10.00 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 250.00 25.00 45.75 35.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 19,665.00 20.00 6.40 2.60 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 258.00 30.00 52.05 52.70 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 140.00 55.00 27.82 20.69 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 8,708.00 6.43 7.54 7.54 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 51,313.00 15.00 10.83 8.31 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 1,090.00 15.00 23.00 15.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 2,527.00 18.00 24.58 25.75 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 29.00 21.50 48.25 60.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 652.00 25.00 29.00 34.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 6,583.00 8.19 8.19 8.19 CR100-342 US-6 at Garrison 12/17/20 200.00 20.00 28.83 22.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 163,412.00 9.42 10.35 10.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 174,493.00 9.61 11.36 10.63 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 383,554.00 9.40 8.54 9.22 =============== 202-00222 Removal of Detour Pavement Sq Yard ================================================ NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 56,410.00 4.96 5.21 5.21 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 56,410.00 4.96 5.21 5.21 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 56,410.00 4.96 5.21 5.21 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 30 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00226 Rem of Asph Mat (Special) Sq Yard ================================================ STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 3,464.00 10.00 9.99 6.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,464.00 10.00 9.99 6.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,464.00 10.00 9.99 6.30 =============== 202-00240 Rem Asphalt Mat (Planing) Sq Yard ================================================ STA0142-066 SH 14 New Raymer West 01/09/20 177,200.00 1.60 1.26 0.75 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 1,650.00 7.00 4.50 4.50 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 480,255.00 1.75 2.72 2.00 STA006A-067 SH 6 Merino to Atwood 01/16/20 136,413.00 2.25 1.25 0.60 STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 847.00 15.00 14.25 18.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 246,781.00 2.00 2.02 1.54 STR141A-044 SH 141 AND SH 145, FROM SLICK 01/30/20 108,716.00 2.50 2.21 1.40 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 91,710.00 3.75 7.93 6.91 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 2,609.00 5.00 6.82 6.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 5,437.00 3.00 6.13 5.25 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 15,500.00 10.00 3.53 5.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 13,561.00 2.50 3.89 4.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 14,831.00 10.00 3.42 4.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 235,201.00 1.85 2.95 1.85 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 2,051.00 5.00 6.75 7.80 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 6,694.00 15.00 6.40 4.65 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 951.00 31165.00 6.50 6.50 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 929.00 5.00 6.98 5.93 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 11,974.00 2.00 3.55 3.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 110,832.00 2.25 5.11 4.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,664,142.00 20.07 3.00 2.16 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 3,001.00 10.00 8.81 9.11 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 6,717.00 5.00 4.95 4.00 IM0761-226 I76/SH52 Interchange 04/02/20 1,181.00 7.00 8.83 7.71 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 537.00 8.00 12.37 9.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 2,377.00 2.50 19.93 23.80 C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 1,551.00 3.00 7.34 5.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 255.00 7.00 24.33 6.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 7,543.00 3.00 3.42 3.10 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 5,687.00 4.50 4.33 3.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 28,849.00 4.74 5.73 6.19 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 31 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00240 Rem Asphalt Mat (Planing) Sq Yard ================================================ SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 1,174.00 10.00 7.50 5.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 1,584.00 7.49 5.57 5.20 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 7,793.00 2.50 3.26 1.50 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 81,999.00 5.00 2.04 1.30 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 4,410.00 5.00 4.86 11.25 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 528.00 8.39 7.99 7.99 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 97,488.00 4.92 2.40 1.91 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 7,352.00 20.00 33.00 39.01 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 381,038.00 2.00 2.70 1.60 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 165,114.00 3.00 4.15 2.95 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 133,000.00 3.00 5.56 3.90 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 17,206.00 5.00 4.84 6.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 5,139.00 4.00 3.33 1.20 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 110,251.00 2.55 2.75 2.77 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 149,670.00 4.00 2.63 1.95 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 2,666.00 5.78 5.78 5.78 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 1,407.00 10.00 6.46 5.15 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 125,676.00 1.33 1.27 1.27 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,098,519.00 2.72 3.53 2.54 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,888,998.00 12.81 3.19 2.34 =============== 202-00246 Rem Asphalt Mat (Planing)(Special) Sq Yard ================================================ NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 13,504.00 6.00 11.12 8.50 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 1,898.00 2.25 16.93 11.86 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 7,815.00 10.00 12.00 15.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 2,318.00 6.00 20.25 16.50 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 282.00 20.00 28.08 24.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 136.00 30.00 65.21 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 25,953.00 7.21 12.80 11.86 IM0761-226 I76/SH52 Interchange 04/02/20 1,287.00 10.00 16.39 9.01 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,287.00 10.00 16.39 9.01 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 32 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00246 Rem Asphalt Mat (Planing)(Special) Sq Yard ================================================ MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 6,336.00 7.00 3.76 1.70 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 4,126.00 10.00 16.62 2.35 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 750.00 10.00 31.65 18.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 411.00 7.00 27.82 8.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 11,623.00 8.26 11.78 3.21 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 12,563.00 15.00 10.67 6.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 12,563.00 15.00 10.67 6.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 51,426.00 9.42 12.15 8.61 =============== 202-00248 Rem Rumble Strips Lin Foot =============================================== C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 7,150.00 4.00 2.94 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7,150.00 4.00 2.94 3.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 3,240.00 5.49 7.01 7.01 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,240.00 5.49 7.01 7.01 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10,390.00 4.46 3.16 4.25 =============== 202-00250 Rem Pavement Marking Sq Foot ================================================ FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 8,837.00 1.00 1.81 1.60 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 716.00 5.00 5.58 6.25 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 455.00 3.00 4.00 4.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 72,250.00 0.90 0.82 0.90 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 1,400.00 2.00 3.36 3.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 41,460.00 1.00 0.73 0.65 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 33 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00250 Rem Pavement Marking Sq Foot ================================================ NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 20,000.00 1.00 1.50 2.00 MTCER300-257 R3 FY 20/21 Region Wide Epoxy 02/06/20 1,438,746.00 0.52 0.53 0.30 FSA2873-194 US 287 Longmont Intersection 02/13/20 1,648.00 2.00 3.51 3.10 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 1,700.00 4.00 2.25 2.50 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 92,491.00 0.85 0.65 0.70 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 2,750.00 7.00 3.20 3.20 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 23,162.00 2.00 1.32 1.23 NHPP0502-082 US 50 MONTROSE RE CHIP SEAL 03/05/20 269,231.00 0.80 0.65 0.60 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 350.00 4.50 5.82 5.69 STRR300-249 Grand and Jackson Counties AD 03/05/20 1,116.00 3.50 9.33 3.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 27,458.00 2.00 2.42 2.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 57,618.00 0.75 0.88 0.90 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 14,458.00 0.66 3.23 3.40 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 4,500.00 1.00 3.03 3.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,080,346.00 0.66 0.70 0.50 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 124,203.00 0.75 0.73 0.75 IM0761-226 I76/SH52 Interchange 04/02/20 32,300.00 1.00 1.25 1.06 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 17.00 1.00 3.63 4.00 MTCER300-259 MTCE R3 FY20/21 Region Wide S 04/02/20 1,500.00 2.00 2.75 2.75 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 120,754.00 1.00 0.99 0.75 SFTY2254-091 225 Ramp Improvements 04/09/20 5,550.00 3.00 2.50 3.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 20,000.00 0.70 1.35 1.10 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 3,000.00 1.00 2.53 2.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 444.00 5.00 6.25 4.25 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 3,900.00 2.50 2.53 2.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 23,986.00 1.20 1.18 0.80 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 4,165.00 2.80 2.27 2.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 862.00 3.25 6.89 6.25 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 67,537.00 0.70 0.83 0.80 MTCE R100-341 Various Highways in Region 1 05/21/20 4,536,595.00 0.43 0.49 0.33 MTCER200-265 Pueblo 05/28/20 1,489,089.00 0.55 0.45 0.28 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 10,467.00 3.00 2.66 2.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6,444,369.00 0.49 0.54 0.36 MTCER400-381 REGION 4 FY21 EPOXY 07/02/20 2,621,293.00 0.55 0.49 0.45 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 621.00 3.00 5.88 3.00 STMM086-083 ADA PUEBLO METRO 07/09/20 320.00 1.00 16.50 15.00 MTCER300-258 MTCE R3 FY20 Region Roundabou 07/09/20 25,000.00 3.30 3.75 3.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 34 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00250 Rem Pavement Marking Sq Foot ================================================ SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 4,510.00 1.00 2.75 3.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 854.00 1.00 5.00 6.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 20.00 4.00 4.40 4.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 2,489.00 2.10 3.49 4.30 STM094A-038 SH94 WB PASSING LANE 09/01/20 30,185.00 0.93 0.93 0.93 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 1,673.00 7.00 3.33 2.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 106.00 5.00 11.15 5.27 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 88.00 1.00 6.86 5.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 28,840.00 2.00 1.06 1.75 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 4,700.00 1.00 3.27 3.15 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 480.00 8.00 3.53 2.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,721,179.00 0.60 0.54 0.52 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 110,382.00 1.00 0.73 0.55 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 104,555.00 0.80 0.72 0.60 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 27,473.00 1.00 0.79 0.79 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 139,579.00 0.70 0.57 0.60 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 29,952.00 2.00 0.73 0.64 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 4,993.00 2.00 2.75 2.50 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 7,370.00 3.32 3.32 3.32 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 50,100.00 1.25 0.61 0.80 CR100-342 US-6 at Garrison 12/17/20 1,811.00 4.50 5.38 1.50 STA141A-051 This will be a chipseal proje 12/17/20 399,967.00 0.65 0.62 0.50 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 72,130.00 1.09 1.26 1.26 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 948,312.00 0.87 0.67 0.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12,194,206.00 0.58 0.57 0.44 =============== 202-00251 Rem Pvmt Marking (Asph Grooving) Sq Foot ================================================ NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 121,350.00 0.45 0.69 0.67 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 57,463.00 0.75 0.68 0.65 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 250.00 0.50 6.31 7.77 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 179,063.00 0.55 0.71 0.67 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 1,290.00 1.50 5.37 4.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 8,172.00 1.39 1.39 1.39 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9,462.00 1.40 3.48 1.75 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 35 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00251 Rem Pvmt Marking (Asph Grooving) Sq Foot ================================================ IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 25,795.00 0.60 0.90 0.86 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 25,795.00 0.60 0.90 0.86 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 214,320.00 0.59 0.83 0.74 =============== 202-00254 Rem of Pvmt Mkg (12 In) Sq Foot ================================================ NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 2,000.00 1.25 1.50 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,000.00 1.25 1.50 2.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 5,000.00 1.00 1.35 1.10 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,000.00 1.00 1.35 1.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,000.00 1.07 1.36 1.36 =============== 202-00256 Rem of Pvmt Mkg (15 In) Sq Foot ================================================ NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 1,000.00 1.25 1.50 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,000.00 1.25 1.50 2.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 2,500.00 1.25 1.35 1.10 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,500.00 1.25 1.35 1.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,500.00 1.25 1.36 1.36 =============== 202-00260 Rem of Pvmt Mkg (On-Call) Sq Foot ================================================ MTCER300-257 R3 FY 20/21 Region Wide Epoxy 02/06/20 74,000.00 0.65 0.66 0.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 74,000.00 0.65 0.66 0.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 74,000.00 0.65 0.66 0.42 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 36 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00400 Rem Bridge Each =================================================== BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 2.00 28000.00 58166.67 75000.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 1.00 150000.00 72894.59 36379.49 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 68666.67 63592.74 62126.50 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 175000.00 72605.83 76998.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 1.00 50000.00 71122.78 75000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 112500.00 71820.68 75999.25 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 2.00 90176.50 40825.75 45000.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 8.00 72578.13 75760.86 75760.86 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 76097.80 52470.79 69608.69 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1.00 117322.07 117322.07 117322.07 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1.00 93388.96 116586.02 116586.02 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 105355.52 116954.05 116954.05 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17.00 82511.12 63264.85 74610.17 =============== 202-00405 Rem of Pilling Each =================================================== NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 11.00 2979.96 2242.73 2242.73 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 11.00 2979.96 2242.73 2242.73 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 2979.96 2242.73 2242.73 =============== 202-00420 Rem Ped Rail Lin Foot =============================================== NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 74.00 12.00 39.00 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 74.00 12.00 39.00 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 74.00 12.00 39.00 50.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 37 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00425 Rem Bridge Railing Lin Foot =============================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 5,109.00 20.00 23.27 22.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 1,215.00 27.00 35.50 31.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 583.00 25.00 25.46 20.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 136.00 30.00 26.81 37.42 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 157.00 55.00 55.00 41.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7,200.00 22.54 26.16 24.06 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 280.00 20.00 19.80 10.60 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 164.00 31.44 47.60 47.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 444.00 24.23 22.27 24.27 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 184.00 35.00 85.66 16.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 184.00 35.00 85.66 16.95 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,828.00 22.93 27.27 23.91 =============== 202-00450 Rem Port Present Str (1) Sq Yard ================================================ IM0761-226 I76/SH52 Interchange 04/02/20 53.00 215.00 386.71 225.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 53.00 215.00 386.71 225.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 399.00 95.00 219.14 160.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 21.00 100.00 219.49 233.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 420.00 95.25 219.16 163.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 473.00 108.67 238.05 170.52 =============== 202-00453 Rem Port Present Str (2) Sq Yard ================================================ NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 220.00 291.00 384.76 352.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 38 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00453 Rem Port Present Str (2) Sq Yard ================================================ NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 33.00 350.00 583.53 567.06 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 483.00 350.00 357.50 350.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 188.00 300.00 345.00 340.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 5.00 300.00 392.22 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 929.00 325.64 371.24 356.43 IM0761-226 I76/SH52 Interchange 04/02/20 104.00 250.00 680.44 530.00 NHPPR100-251 SH 2/ Vasquez 06/25/20 35.00 280.00 622.50 985.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 139.00 257.55 675.35 644.57 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 126.00 185.00 458.71 550.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 21.00 150.00 319.36 321.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 40.00 408.51 685.06 685.06 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 187.00 228.88 450.60 553.17 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 231.00 400.00 376.00 353.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 100.00 400.00 458.92 470.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 331.00 400.00 401.05 388.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,586.00 323.78 443.53 411.54 =============== 202-00460 Rem Port Present Str (3) Sq Yard ================================================ NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 6.00 498.00 1251.82 1111.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 3.00 500.00 1356.32 1312.63 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 33.00 550.00 850.00 1000.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 37.00 475.00 890.00 880.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 79.00 509.03 930.67 964.10 NHPPR100-251 SH 2/ Vasquez 06/25/20 2.00 480.00 1348.35 2139.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 480.00 1348.35 2139.70 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 39 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00460 Rem Port Present Str (3) Sq Yard ================================================ BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 21.00 340.00 931.57 700.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 4.00 300.00 675.37 577.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 8.00 1246.52 1316.77 1316.77 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 33.00 554.91 914.44 834.61 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 36.00 500.00 654.67 614.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 10.00 800.00 1879.39 1435.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 46.00 565.22 920.91 792.48 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 160.00 534.28 925.35 902.75 =============== 202-00495 Rem Port Present Str LUMP SUM =============================================== NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 1.00 15000.00 12807.36 5750.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1.00 10000.00 17412.50 11000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 12500.00 15877.45 8375.00 IM0761-226 I76/SH52 Interchange 04/02/20 1.00 120000.00 257771.43 130000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 120000.00 257771.43 130000.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 70044.01 111373.05 111373.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 70044.01 111373.05 111373.05 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 1.00 5000.00 7425.00 15900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 5000.00 7425.00 15900.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 44008.80 89000.10 54804.61 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 40 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00500 Rem Port Present Str Each =================================================== STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 4.00 2300.00 5950.00 5900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 2300.00 5950.00 5900.00 SFTY2254-091 225 Ramp Improvements 04/09/20 1.00 5000.00 3200.00 4900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 5000.00 3200.00 4900.00 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 1.00 1591.00 1125.00 1900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1591.00 1125.00 1900.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 1.00 1200.00 4705.00 1790.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 2.00 8202.83 9178.44 9178.44 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 5868.55 5823.36 6715.63 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 3710.74 4950.57 5616.32 =============== 202-00502 Rem Port Present Str Cubic Yard ============================================= NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 8.00 1350.00 1239.71 1805.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 1350.00 1239.71 1805.00 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 1.00 3000.00 4070.00 3010.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 3000.00 4070.00 3010.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 1533.33 1554.19 1938.89 =============== 202-00503 Rem Port Present Str Sq Yard ================================================ BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 556.00 720.00 192.71 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 556.00 720.00 192.71 65.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 41 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00503 Rem Port Present Str Sq Yard ================================================ NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 28.00 550.00 682.91 678.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 28.00 550.00 682.91 678.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 584.00 711.85 203.07 94.39 =============== 202-00504 Rem Exp Device Lin Foot =============================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 88.00 170.00 128.21 73.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 618.00 250.00 327.50 490.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 141.00 175.00 143.50 127.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 847.00 229.20 268.86 386.25 NHPPR100-251 SH 2/ Vasquez 06/25/20 648.00 200.00 149.15 125.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 648.00 200.00 149.15 125.30 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 158.00 300.00 204.00 187.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 158.00 300.00 204.00 187.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,653.00 224.52 216.53 264.91 =============== 202-00505 Rem Port of Present Structure Sq Foot ================================================ NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 22.00 150.00 282.43 367.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 2,869.00 175.00 48.35 50.34 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 40.00 230.00 284.50 269.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,931.00 175.56 54.18 55.70 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 442.00 74.88 85.61 85.61 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 442.00 74.88 85.61 85.61 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,373.00 162.37 56.38 59.62 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 42 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00520 Rem of Exp Joint Matl Lin Foot =============================================== NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 146.00 35.00 152.18 141.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 146.00 35.00 152.18 141.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 146.00 35.00 152.18 141.25 =============== 202-00700 Rem Light Standard Each =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 2.00 500.00 750.00 750.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 15.00 500.00 510.00 490.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1.00 580.00 888.00 896.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 18.00 504.44 535.22 541.44 IM0761-226 I76/SH52 Interchange 04/02/20 14.00 375.00 694.70 699.60 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 800.00 287.06 275.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 2.00 2000.00 2140.00 2140.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 1.00 800.00 1130.40 835.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 18.00 602.78 710.70 843.58 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 3.00 400.00 819.14 750.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 17.00 750.00 425.28 411.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 1.00 600.00 873.67 700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 21.00 692.86 501.60 473.19 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1.00 807.45 807.45 807.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 807.45 807.45 807.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 58.00 608.40 590.12 615.08 =============== 202-00705 Rem Light Standard Foundation Each =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 2.00 550.00 650.00 650.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 43 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00705 Rem Light Standard Foundation Each =================================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 15.00 700.00 913.33 880.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1.00 610.00 1067.00 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 18.00 678.33 908.86 866.67 SFTY2254-091 225 Ramp Improvements 04/09/20 3.00 1000.00 710.00 700.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 900.00 654.29 533.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 975.00 678.17 658.38 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 17.00 800.00 456.98 415.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 17.00 800.00 456.98 415.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1.00 807.45 807.45 807.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 807.45 807.45 807.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 762.94 611.13 652.40 =============== 202-00710 Rem Power Pole Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 1.00 1500.00 7473.33 3910.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1500.00 7473.33 3910.00 IM0761-226 I76/SH52 Interchange 04/02/20 2.00 2000.00 564.70 657.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 2000.00 564.70 657.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 1833.33 1783.87 1741.47 =============== 202-00720 Rem CCTV Camera Each =================================================== NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1.00 74.69 80.07 80.07 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 74.69 80.07 80.07 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 74.69 80.07 80.07 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 44 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00725 Rem Ex Lighting Sys LUMP SUM =============================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1.00 15000.00 2875.00 2800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 15000.00 2875.00 2800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 15000.00 2875.00 2800.00 =============== 202-00750 Rem Luminaire Each =================================================== NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 3.00 100.00 543.33 740.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 614.00 130.00 81.87 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 617.00 129.85 83.55 127.99 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 3.00 200.00 82.00 75.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 26.00 100.00 116.31 84.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 29.00 110.34 112.24 83.61 MPC040-061 R2 FY 21 Sign Replacement 10/01/20 1.00 163.91 1225.00 500.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1.00 404.25 404.25 404.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 284.08 951.42 452.13 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 648.00 129.46 86.46 127.00 =============== 202-00805 Rem Overhead Sign Str Each =================================================== HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 2.00 5000.00 5937.50 7635.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 5000.00 5937.50 7635.00 SFTY2254-091 225 Ramp Improvements 04/09/20 1.00 10000.00 6825.00 6650.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 10000.00 6825.00 6650.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 6666.67 6233.33 7306.67 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 45 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00810 Rem Ground Sign Each =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 2.00 200.00 161.79 155.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 7.00 80.00 200.00 200.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 73.00 60.00 79.51 85.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 6.00 68.00 121.34 125.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 22.00 100.00 102.51 105.01 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 4.00 200.00 200.00 200.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 15.00 60.00 143.74 132.48 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 20.00 125.00 126.00 102.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 109.00 85.00 154.58 150.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 1.00 400.00 168.33 165.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 156.00 65.00 84.31 100.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 98.00 75.00 111.01 100.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 1.00 150.00 375.00 500.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 180.00 88.50 102.29 114.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 13.00 200.00 151.67 153.01 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 5.00 150.00 150.00 150.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 3.00 100.00 156.28 175.50 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 14.00 200.00 100.00 91.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 57.00 80.00 69.27 76.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 9.00 200.00 147.00 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 795.00 85.78 103.94 110.43 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 1.00 175.00 175.40 167.84 IM0761-226 I76/SH52 Interchange 04/02/20 79.00 70.00 135.43 159.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 1.00 100.00 402.00 1000.00 SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 495.00 150.00 100.00 100.00 SFTY2254-091 225 Ramp Improvements 04/09/20 4.00 150.00 222.50 215.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 30.00 200.00 121.92 110.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 5.00 70.00 192.67 125.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 3.00 150.00 413.33 815.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 21.00 50.00 226.67 215.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 5.00 100.00 110.38 113.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 1.00 100.00 253.33 350.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 13.00 468.00 259.49 259.49 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 9.00 200.00 2000.00 2500.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 6.00 110.00 141.23 98.17 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 673.00 145.10 151.94 152.08 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 1.00 150.00 335.19 500.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 46 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00810 Rem Ground Sign Each =================================================== STMM086-083 ADA PUEBLO METRO 07/09/20 72.00 80.00 275.00 150.00 MTCER300-255 MTCE R3 FY20/21 Signal Replac 07/09/20 299.00 50.00 91.25 50.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 15.00 70.00 137.50 190.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 2.00 200.00 135.00 115.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 8.00 109.87 78.05 34.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 7.00 80.25 80.25 80.25 MTCE0702-386 Grand Junction 09/03/20 71.00 250.00 86.67 50.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 62.00 75.00 66.33 58.70 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 28.00 340.00 114.27 136.80 SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 534.00 175.00 262.50 350.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 8.00 125.00 159.67 50.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 13.00 150.00 162.94 162.94 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,120.00 135.78 153.55 205.89 MPC040-061 R2 FY 21 Sign Replacement 10/01/20 247.00 68.04 80.00 60.00 MTCE0253-271 FY20 I-25 SIGN REPL PHASE 1 10/08/20 239.00 100.00 121.67 65.00 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 6.00 175.00 237.33 122.00 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 7.00 128.00 235.00 215.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 11.00 200.00 92.50 95.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 15.00 106.60 106.60 106.60 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 10.00 175.00 157.42 124.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 200.00 153.38 164.12 164.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 735.00 107.32 117.56 94.29 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,323.00 119.41 133.15 147.47 =============== 202-00815 Rem of Sign (Special) Each =================================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 5.00 1000.00 1001.67 530.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 1000.00 1001.67 530.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 1.00 1000.00 7139.33 8440.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 1000.00 7139.33 8440.00 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 1.00 150.00 633.33 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 150.00 633.33 500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 878.57 1825.86 1655.71 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 47 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00821 Rem Sign Panel Each =================================================== STA0142-066 SH 14 New Raymer West 01/09/20 38.00 80.00 39.00 26.00 FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 6.00 40.00 657.23 510.00 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 60.00 50.00 84.00 90.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 2.00 30.00 110.00 110.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 223.00 30.00 69.13 68.26 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 8.00 100.00 135.00 120.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 17.00 60.00 102.18 99.36 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 37.00 39.20 150.32 200.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 1.00 60.00 181.67 275.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 4.00 30.00 84.31 100.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 55.00 75.00 46.59 65.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 88.00 60.00 61.46 51.35 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 58.00 30.00 47.93 40.80 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 63.00 80.00 66.00 66.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 4.00 40.00 93.00 90.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 17.00 70.00 234.40 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 681.00 49.95 83.77 77.04 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 85.00 110.00 82.58 108.29 SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 366.00 65.00 50.00 50.00 C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 1.00 53.00 140.33 70.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 2.00 50.00 71.00 70.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 454.00 73.33 63.82 61.05 MTCER300-255 MTCE R3 FY20/21 Signal Replac 07/09/20 2,862.00 30.00 29.00 6.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 4.00 65.00 55.00 75.00 MTCE0702-386 Grand Junction 09/03/20 310.00 50.00 68.33 30.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 10.00 50.00 53.19 41.10 SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 224.00 65.00 192.50 300.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 4.00 50.00 54.31 54.31 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,414.00 34.24 37.65 27.71 MPC040-061 R2 FY 21 Sign Replacement 10/01/20 330.00 31.83 130.00 75.00 MTCE0253-271 FY20 I-25 SIGN REPL PHASE 1 10/08/20 3.00 60.00 51.67 85.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 48 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00821 Rem Sign Panel Each =================================================== NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 30.00 95.00 306.25 375.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 14.00 100.00 89.00 95.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 377.00 39.61 147.80 99.69 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,926.00 40.42 49.06 43.11 =============== 202-00823 Rem Dynamic Message Sign Each =================================================== NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1.00 2453.37 2629.99 2629.99 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 2453.37 2629.99 2629.99 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2453.37 2629.99 2629.99 =============== 202-00825 Rem Flashing Beacon Each =================================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 4.00 50.00 416.01 402.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 50.00 416.01 402.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 50.00 416.01 402.00 =============== 202-00827 Rem of Pull Box Each =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 2.00 200.00 350.00 350.00 STRR300-249 Grand and Jackson Counties AD 03/05/20 8.00 300.00 431.00 300.00 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 4.00 300.00 451.37 200.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 12.00 200.00 685.00 660.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1.00 350.00 249.17 260.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 27.00 250.00 522.32 447.41 IM0761-226 I76/SH52 Interchange 04/02/20 4.00 1000.00 138.69 104.94 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 18.00 350.00 326.67 195.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 5.00 150.00 247.00 220.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 2.00 180.00 277.67 600.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 10.00 482.00 481.50 481.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 39.00 416.15 280.61 283.20 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 49 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00827 Rem of Pull Box Each =================================================== STMM086-083 ADA PUEBLO METRO 07/09/20 1.00 300.00 637.50 575.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 9.00 400.00 360.00 200.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 106.00 550.00 543.00 385.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 36.00 650.00 686.19 647.97 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 7.00 260.00 278.20 278.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 159.00 549.81 565.50 430.56 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 2.00 231.00 231.00 231.00 CR100-342 US-6 at Garrison 12/17/20 22.00 250.00 335.42 150.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 2.00 176.35 189.05 189.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 26.00 242.87 331.73 159.23 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 251.00 465.00 508.47 381.37 =============== 202-00828 Rem Traf Sig Equipment LUMP SUM =============================================== C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 1.00 15000.00 15000.00 10000.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1.00 30000.00 20783.33 20000.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1.00 6000.00 12621.25 11000.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1.00 8000.00 5014.00 5152.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1.00 12000.00 24136.00 22200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 14200.00 16201.40 13670.40 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 12000.00 6241.34 6077.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 1.00 15000.00 24954.12 20585.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 1.00 27500.00 34698.33 45295.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 1.00 10000.00 19395.00 8885.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 1.00 15000.00 17626.00 21656.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 15900.00 17054.68 20499.70 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 1.00 50000.00 33000.00 31000.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 50 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00828 Rem Traf Sig Equipment LUMP SUM =============================================== FSAC010-124 US 40, US 287, SH 88 08/06/20 1.00 18000.00 11775.00 7500.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1.00 15000.00 7270.00 6600.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 1.00 12000.00 8960.33 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 23750.00 11939.73 12025.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 1.00 15000.00 22896.67 25000.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 1.00 10000.00 7632.25 6094.00 FSA1211-098 SH 121 & 1ST AVE 11/19/20 1.00 13000.00 7100.67 6780.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 1.00 15000.00 53637.50 67275.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1.00 15145.54 16235.87 16235.87 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 13629.11 18771.68 24276.97 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19.00 16507.66 16033.70 17912.39 =============== 202-00830 Rem Traf Sig Face Each =================================================== C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 1.00 250.00 241.61 158.04 SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 3.00 75.00 1750.00 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 118.75 1064.37 2289.51 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 118.75 1064.37 2289.51 =============== 202-00831 Rem Traf Sig Head Each =================================================== FSA2873-194 US 287 Longmont Intersection 02/13/20 2.00 125.00 259.17 95.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 3.00 115.00 244.50 247.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 119.00 254.28 186.20 CR100-342 US-6 at Garrison 12/17/20 1.00 150.00 354.00 875.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 150.00 354.00 875.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 124.17 279.21 301.00 =============== 202-00832 Rem of Sign Panel (Spec) Each =================================================== SFTY2254-091 225 Ramp Improvements 04/09/20 3.00 3500.00 597.50 580.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 3500.00 597.50 580.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 3500.00 597.50 580.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 51 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00840 Rem Traf Sig Pole Each =================================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 2.00 1000.00 2550.00 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1000.00 2550.00 2500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1000.00 2550.00 2500.00 =============== 202-00858 Rem Pedestal Pole Each =================================================== SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 3.00 1100.00 570.13 495.67 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 1100.00 570.13 495.67 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 1.00 550.00 594.80 431.98 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 550.00 594.80 431.98 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 962.50 576.30 479.75 =============== 202-00860 Rem Ped Push Button Each =================================================== C1601-082 Hawkins Signal and Curb Ramps 04/30/20 32.00 75.00 566.67 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 32.00 75.00 566.67 100.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 30.00 100.00 98.00 110.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 21.00 120.00 113.00 79.02 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 51.00 108.24 103.53 97.24 CR100-342 US-6 at Garrison 12/17/20 29.00 75.00 98.83 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 29.00 75.00 98.83 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 112.00 90.13 182.17 85.80 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 52 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00889 Rem of Detect Warning Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 30.00 400.00 351.00 288.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 30.00 400.00 351.00 288.00 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 2.00 300.00 375.00 500.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 2.00 350.00 267.50 235.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 325.00 332.00 367.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 34.00 391.18 349.10 297.35 =============== 202-00890 Rem Span Wire Cable Lin Foot =============================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 64.00 5.00 11.33 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 64.00 5.00 11.33 11.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 64.00 5.00 11.33 11.00 =============== 202-00895 Rem of Impact Attenuator Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 2.00 1101.00 2902.67 6238.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 1.00 2500.00 1667.59 1720.18 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 1567.33 2593.90 4732.06 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 1567.33 2593.90 4732.06 =============== 202-00900 Rem Conc Footing Each =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 2.00 500.00 1500.00 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 500.00 1500.00 1500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 500.00 1500.00 1500.00 =============== 202-01000 Rem Fence Lin Foot =============================================== BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 268.00 3.00 3.66 4.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 53 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01000 Rem Fence Lin Foot =============================================== FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 790.00 2.00 2.65 2.60 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 2,219.00 1.75 2.72 0.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,277.00 1.91 2.78 1.56 IM0761-226 I76/SH52 Interchange 04/02/20 76.00 2.00 3.39 3.07 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 806.00 3.00 4.35 5.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 11,365.00 2.00 0.67 0.77 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 332.00 6.00 8.67 3.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 4,142.00 1.00 0.92 0.92 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 200.00 2.00 8.59 1.25 NH050A-037 US 50A Pueblo Regional Pond -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16,921.00 1.88 0.99 1.07 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 160.00 2.00 13.00 15.00 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 28.00 10.00 33.00 30.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 2,281.00 2.13 2.95 2.50 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 335.00 5.00 6.63 8.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 500.00 2.00 4.92 5.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 17,602.00 0.60 0.66 0.55 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 2,118.00 1.25 1.36 1.36 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 23,024.00 0.93 1.19 1.16 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 3,567.00 3.00 12.98 11.15 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 57,834.00 1.00 1.09 0.95 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 16,095.00 0.71 0.76 0.76 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 77,496.00 1.03 1.42 1.38 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 120,718.00 1.15 1.34 1.30 =============== 202-01015 Rem Rockfall Fence Lin Foot =============================================== NHPP0702-407 PR I-70 Glenwood Springs Griz 11/03/20 150.00 300.00 471.17 155.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 150.00 300.00 471.17 155.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 150.00 300.00 471.17 155.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 54 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01030 Rem of Road Closure Gate Each =================================================== STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 1.00 1500.00 929.92 816.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1500.00 929.92 816.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1.00 1023.75 1023.75 1023.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1023.75 1023.75 1023.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1261.88 943.32 919.88 =============== 202-01035 Rem of Gate Each =================================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1.00 200.00 301.02 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 200.00 301.02 200.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 2.00 128.00 130.36 130.36 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 128.00 130.36 130.36 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 1.00 300.00 290.51 263.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 300.00 290.51 263.10 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 32.00 110.00 108.33 124.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 32.00 110.00 108.33 124.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 36.00 118.78 122.02 130.33 =============== 202-01130 Rem Gdrail Ty 3 Lin Foot =============================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 22,112.00 5.00 4.80 4.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 55 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01130 Rem Gdrail Ty 3 Lin Foot =============================================== BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 753.00 5.00 6.29 4.85 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 4,965.00 6.00 3.48 3.30 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 23,906.00 10.00 5.55 7.09 STR141A-044 SH 141 AND SH 145, FROM SLICK 01/30/20 5,743.00 4.00 3.94 3.80 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 505.00 12.00 6.30 6.49 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 675.00 10.00 9.00 8.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 1,900.00 6.00 6.99 9.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 5,575.00 4.50 7.99 8.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 1,163.00 10.00 8.38 5.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 3,134.00 3.20 3.98 4.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 988.00 8.00 6.23 9.49 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 1,862.50 6.00 3.20 3.30 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 50.00 15.00 11.50 11.50 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 344.00 4.50 8.69 5.18 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 470.00 4.50 3.36 2.25 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 69.00 10.00 23.28 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 74,214.50 6.75 5.14 5.65 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 8,366.00 6.00 7.77 7.04 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 4,871.00 5.00 4.93 4.25 IM0761-226 I76/SH52 Interchange 04/02/20 906.00 7.00 2.82 2.70 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 3,538.00 5.00 4.29 2.65 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 1,103.00 5.00 4.09 3.17 SFTY2254-091 225 Ramp Improvements 04/09/20 1,152.00 20.00 3.75 3.50 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 2,899.00 3.50 3.53 3.52 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 172.00 10.00 24.17 27.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 676.00 5.00 5.91 8.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 375.00 3.00 3.37 3.37 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 775.00 14.00 10.75 11.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 24,833.00 6.22 5.32 5.21 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1,217.00 3.50 3.76 3.50 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 1,075.00 5.00 3.88 4.70 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 1,150.00 4.00 3.79 3.60 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1,533.00 5.00 3.58 3.58 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,975.00 4.40 3.79 3.81 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 631.00 10.00 23.53 20.60 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 56 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01130 Rem Gdrail Ty 3 Lin Foot =============================================== NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 6,887.00 8.00 4.07 3.40 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 15,708.00 7.00 6.77 4.20 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 3,504.00 5.00 3.23 4.00 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 935.00 4.00 10.21 9.81 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 23,245.00 4.50 5.01 2.66 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 232.00 13.00 14.00 14.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 143.00 7.91 7.91 7.91 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 940.00 4.00 4.10 4.35 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 12,873.00 2.79 2.99 2.99 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 65,098.00 5.24 5.32 3.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 169,120.50 6.02 5.17 4.74 =============== 202-01140 Rem Gdrail Ty 4 Lin Foot =============================================== NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 77.00 170.00 92.67 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 77.00 170.00 92.67 21.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 77.00 170.00 92.67 21.00 =============== 202-01170 Rem Gdrail Ty 7 Lin Foot =============================================== NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 300.00 10.00 36.91 33.82 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 347.00 50.00 16.50 18.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 165.00 65.00 70.40 37.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 812.00 38.27 39.50 27.71 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 50.00 30.00 90.00 28.00 IM0761-226 I76/SH52 Interchange 04/02/20 350.00 11.00 25.54 18.99 SFTY2254-091 225 Ramp Improvements 04/09/20 1,068.00 70.00 24.50 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,468.00 54.57 26.44 23.67 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 52.00 28.00 88.00 115.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 328.00 5.00 26.39 26.39 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 380.00 8.15 41.22 38.52 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 57 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01170 Rem Gdrail Ty 7 Lin Foot =============================================== NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 740.00 40.00 26.37 24.10 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 50.00 40.00 36.50 53.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 81.00 29.40 29.40 29.40 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 413.00 5.00 14.98 14.98 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,284.00 28.07 25.53 22.63 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,944.00 38.12 29.86 25.59 =============== 202-01175 Rem of Guardrail (Spec) Lin Foot =============================================== NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 50.00 27.00 67.50 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 50.00 27.00 67.50 100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 27.00 67.50 100.00 =============== 202-01180 Rem Median Barrier Lin Foot =============================================== NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 112.00 75.00 75.00 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 112.00 75.00 75.00 90.00 SFTY2254-091 225 Ramp Improvements 04/09/20 32.00 50.00 59.50 85.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 32.00 50.00 59.50 85.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 144.00 69.44 71.56 88.89 =============== 202-01200 Rem Tensioned Cable Barrier Lin Foot =============================================== IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 1,262.00 5.00 5.09 3.17 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,262.00 5.00 5.09 3.17 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 22,797.00 3.88 4.31 4.31 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 22,797.00 3.88 4.31 4.31 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 24,059.00 3.94 4.39 4.25 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 58 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01300 Rem End Anchorage Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 52.00 324.00 311.00 380.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 8.00 400.00 446.06 300.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 12.00 300.00 347.50 330.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 72.00 400.00 151.98 103.96 STR141A-044 SH 141 AND SH 145, FROM SLICK 01/30/20 22.00 350.00 381.93 395.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 4.00 300.00 427.00 354.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 51.00 300.00 380.67 400.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 6.00 375.00 284.91 210.00 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 10.00 300.00 622.50 1025.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 2.00 400.00 550.00 550.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 1.00 300.00 654.97 625.21 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 5.00 300.00 404.22 340.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 245.00 344.89 329.66 322.64 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 29.00 350.00 463.08 308.62 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 24.00 200.00 332.50 400.00 IM0761-226 I76/SH52 Interchange 04/02/20 9.00 250.00 239.55 233.20 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 22.00 400.00 412.38 220.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 11.00 300.00 444.45 388.89 SFTY2254-091 225 Ramp Improvements 04/09/20 3.00 300.00 277.50 270.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 12.00 350.00 286.53 242.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 4.00 350.00 1002.67 893.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 4.00 400.00 379.20 500.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 2.00 241.00 244.42 244.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 120.00 315.68 375.54 329.51 STR184B-006 CULVERTS SH 184 08/06/20 2.00 400.00 350.00 350.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 2.00 350.00 246.14 230.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 6.00 300.00 384.23 411.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 2.00 400.00 356.27 342.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 15.00 300.00 238.98 238.98 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 27.00 318.52 327.79 292.40 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 29.00 400.00 467.33 452.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 59 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01300 Rem End Anchorage Each =================================================== NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 34.00 330.00 368.33 240.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 12.00 400.00 475.00 255.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 19.00 350.00 402.25 400.00 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 10.00 350.00 595.85 918.45 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 24.00 400.00 435.97 320.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 1.00 1000.00 352.50 355.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 8.00 350.00 432.83 404.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 39.00 228.43 244.42 244.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 176.00 341.36 418.44 351.77 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 568.00 336.37 367.97 331.68 =============== 202-01400 Removal of Cattle Guard Each =================================================== NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 2.00 2000.00 1941.67 2560.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 2000.00 1941.67 2560.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 2000.00 1941.67 2560.00 =============== 202-04001 Plug Culvert Each =================================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 16.00 4000.00 2788.59 4300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16.00 4000.00 2788.59 4300.00 IM0761-226 I76/SH52 Interchange 04/02/20 2.00 3000.00 1220.30 472.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 3000.00 1220.30 472.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 1.00 2500.00 5217.07 9174.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 2500.00 5217.07 9174.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19.00 3815.79 2755.32 4153.59 =============== 202-04002 Clean Culvert Each =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 8.00 1500.00 3000.00 3000.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 60 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-04002 Clean Culvert Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 82.00 1650.00 2132.98 2668.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 2.00 1750.00 2221.53 2000.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 75.00 364.00 930.86 595.06 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 2.00 1000.00 2280.00 950.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 14.00 3000.00 2813.08 3939.23 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1.00 2400.00 3083.13 2700.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1.00 1500.00 2519.43 3622.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 16.00 3000.00 1636.00 1350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 201.00 1363.18 1821.74 1872.52 IM0761-226 I76/SH52 Interchange 04/02/20 9.00 2000.00 2098.88 582.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 13.00 1500.00 2287.50 1875.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 1.00 3000.00 6050.00 2200.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 2.00 3500.00 2558.00 1190.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 1.00 2000.00 1934.25 690.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 26.00 1903.85 2270.53 1341.65 STR184B-006 CULVERTS SH 184 08/06/20 5.00 5000.00 4900.00 4900.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 1.00 2567.45 2562.15 1860.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 3.00 2000.00 1731.43 3000.00 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 5.00 2000.00 2817.00 5000.00 CR400-374 FY 20 Culvert Prioritization 09/17/20 3.00 1000.00 5281.75 2400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 17.00 2739.26 3030.47 3974.12 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 3.00 5000.00 2607.33 1622.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 1.00 1000.00 1516.25 1710.00 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 17.00 3000.00 3566.30 3315.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 7.00 2400.00 3250.00 2250.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 1.00 2000.00 9820.00 3850.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 29.00 2958.62 3759.91 2845.90 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 273.00 1669.84 2183.40 2056.23 =============== 202-04003 Clean Culvert (Spec) Each =================================================== NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 1.00 2000.00 18356.67 15000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 2000.00 18356.67 15000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2000.00 18356.67 15000.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 61 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-04004 Plug Culvert (Spec) Each =================================================== NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 2.00 3000.00 4400.00 4400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 3000.00 4400.00 4400.00 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 3.00 17000.00 25756.00 22980.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 17000.00 25756.00 22980.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 11400.00 23243.53 15548.00 =============== 202-04005 Clean Valve Box Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 45.00 277.00 625.09 400.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 2.00 300.00 900.00 900.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 2.00 150.00 510.00 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 49.00 272.76 624.74 414.29 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 2.00 200.00 358.00 535.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 2.00 300.00 435.00 325.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 15.00 500.00 315.50 53.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 4.00 300.00 550.57 697.87 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 2.00 250.00 426.71 620.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 25.00 408.00 368.36 261.86 CR100-342 US-6 at Garrison 12/17/20 3.00 250.00 458.00 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 250.00 458.00 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 77.00 315.78 498.05 350.60 =============== 202-04006 Clean Culvert Hour =================================================== NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 10.00 300.00 475.50 475.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 300.00 475.50 475.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 62 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-04006 Clean Culvert Hour =================================================== STM094A-038 SH94 WB PASSING LANE 09/01/20 8.00 593.58 593.58 593.58 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 10.00 312.00 423.59 423.59 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 18.00 437.15 499.14 499.14 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 66.00 375.00 420.42 420.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 66.00 375.00 420.42 420.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 94.00 378.92 441.35 441.35 =============== 202-04008 Clean Culvert Lin Foot =============================================== STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 645.00 26.00 65.00 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 645.00 26.00 65.00 65.00 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 554.00 35.00 59.00 68.00 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 122.00 65.00 49.75 45.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 501.00 65.00 107.50 85.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,177.00 50.88 74.94 72.85 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 2,000.00 30.00 90.40 36.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,000.00 30.00 90.40 36.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,822.00 35.75 83.98 52.35 =============== 202-04010 Clean Inlet Each =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 7.00 900.00 847.18 205.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 63 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-04010 Clean Inlet Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 4.00 328.00 1302.28 1112.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 77.00 600.00 900.00 800.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 18.00 850.00 2588.01 3346.01 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 5.00 300.00 1074.00 950.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 111.00 636.14 1177.57 1193.34 IM0761-226 I76/SH52 Interchange 04/02/20 6.00 1500.00 608.44 770.00 SFTY2254-091 225 Ramp Improvements 04/09/20 14.00 1250.00 1117.50 1125.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 8.00 2000.00 1792.57 412.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 3.00 550.00 1292.00 800.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 4.00 1500.00 2080.00 1240.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 1.00 1500.00 1647.67 368.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 10.00 1200.00 991.67 800.00 NHPPR100-251 SH 2/ Vasquez 06/25/20 1.00 1000.00 1798.85 1748.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 47.00 1375.53 1297.09 875.46 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 23.00 1000.00 930.00 960.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 6.00 320.00 1077.86 300.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 67.00 1000.00 427.50 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 96.00 957.50 530.42 388.33 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 9.00 1000.00 2132.48 1600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9.00 1000.00 2132.48 1600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 263.00 898.03 896.30 856.61 =============== 202-04050 Clean Exp Joint Lin Foot =============================================== BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 509.00 20.00 22.71 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 509.00 20.00 22.71 10.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 509.00 20.00 22.71 10.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 64 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-04100 Abandon Well Each =================================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 2.00 2000.00 2198.33 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 2000.00 2198.33 3000.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 3000.00 4509.34 2750.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 3000.00 4509.34 2750.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 2333.33 3518.91 2916.67 =============== 202-05010 Sawing Concrete (10 In) Lin Foot =============================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 200.00 6.50 10.15 5.21 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 200.00 6.50 10.15 5.21 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 200.00 6.50 10.15 5.21 =============== 202-05026 Sawing Asphalt Mat (6 In) Lin Foot =============================================== SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 682.00 6.00 6.25 3.47 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 682.00 6.00 6.25 3.47 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 862.00 10.00 10.69 6.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 500.00 9.00 6.64 11.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,362.00 9.63 9.46 7.91 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,044.00 8.42 8.15 6.43 =============== 202-05030 Sawing Asphalt Mat (10 In) Lin Foot =============================================== BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 676.00 4.00 7.41 6.32 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 676.00 4.00 7.41 6.32 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 65 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-05030 Sawing Asphalt Mat (10 In) Lin Foot =============================================== FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 875.00 5.78 5.78 5.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 875.00 5.78 5.78 5.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,551.00 5.00 7.16 6.02 =============== 202-05100 Sandblasting Reinf Steel Sq Yard ================================================ STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 158.00 75.00 47.07 49.02 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 158.00 75.00 47.07 49.02 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 136.00 40.00 10.68 11.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 136.00 40.00 10.68 11.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 294.00 58.81 26.56 31.57 =============== 202-05150 Sandblasting Sq Foot ================================================ NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 260,928.00 1.56 1.10 1.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 260,928.00 1.56 1.10 1.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 260,928.00 1.56 1.10 1.10 =============== 202-06530 Clean Drain Pipe (Spec) Each =================================================== STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 16.00 125.00 409.50 113.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16.00 125.00 409.50 113.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 125.00 409.50 113.00 =============== 202-07000 Oblit Old Road LUMP SUM =============================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1.00 10000.00 10958.33 10800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 10000.00 10958.33 10800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 10000.00 10958.33 10800.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 66 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00000 Uncl Excav Cubic Yard ============================================= STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 2,260.00 18.00 23.50 22.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 657.00 9.00 26.79 26.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 2,523.00 50.00 39.54 40.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 15.00 250.00 153.35 175.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 131.00 100.00 23.00 23.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 9,971.00 15.00 15.67 14.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1,430.00 25.00 33.93 27.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16,987.00 22.07 18.70 20.74 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 100.00 20.00 62.50 70.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 100.00 20.00 62.50 70.00 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 2,145.00 37.50 64.38 85.00 STMM086-083 ADA PUEBLO METRO 07/09/20 51.00 100.00 69.00 48.00 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 370.00 32.00 23.49 22.42 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 15,816.00 13.97 13.94 13.94 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 18,382.00 17.32 31.14 22.50 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 343.00 50.00 55.63 52.90 NHPP0702-407 PR I-70 Glenwood Springs Griz 11/03/20 400.00 40.00 89.53 125.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 230.00 50.00 112.50 65.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 2,500.00 30.00 23.73 24.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,473.00 34.45 33.78 41.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 38,942.00 20.93 22.85 23.52 =============== 203-00010 Uncl Excav (CIP) Cubic Yard ============================================= FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 725.00 25.00 41.80 30.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 625.00 50.00 36.00 36.00 PWQM240-172 El Paso County, north Colorad 01/23/20 1,297.00 20.00 53.75 98.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 67 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00010 Uncl Excav (CIP) Cubic Yard ============================================= STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 674.00 88.00 42.15 36.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 2,282.00 27.00 34.09 24.20 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 14,547.00 20.00 13.34 9.75 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 643.00 30.00 24.82 15.64 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 7,292.00 25.00 33.05 33.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 28,085.00 24.52 26.48 22.91 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 1,656.00 22.00 25.37 31.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 6,877.00 23.00 39.38 43.75 SFTY2254-091 225 Ramp Improvements 04/09/20 6,310.00 45.00 43.00 47.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 623,574.00 10.00 9.55 8.05 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1601-082 Hawkins Signal and Curb Ramps 04/30/20 336.00 50.00 96.33 192.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 2,722.00 30.00 59.33 40.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 1,547.00 30.00 30.77 35.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 148,836.00 7.00 8.34 8.34 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 51,984.00 12.00 16.66 8.30 NH050A-037 US 50A Pueblo Regional Pond -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 843,842.00 10.10 10.34 8.97 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 445.00 45.00 55.00 60.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 8.00 25.00 325.00 400.00 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 2,584.00 25.00 33.93 17.65 FSAC010-124 US 40, US 287, SH 88 08/06/20 85.00 25.00 100.67 97.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 1,522.00 45.19 31.12 19.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 6,250.00 21.43 21.43 21.43 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 14,362.00 12.00 20.49 15.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 25,256.00 18.29 23.44 18.44 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 121.00 65.00 70.53 82.45 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 1,901.00 50.00 81.08 52.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,022.00 50.90 80.07 54.43 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 899,205.00 10.87 10.93 9.77 =============== 203-00014 Uncl Ex (River Bttm Matl Salv and Repl) Cubic Yard ============================================= NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 630.00 32.82 53.82 53.82 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 630.00 32.82 53.82 53.82 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 630.00 32.82 53.82 53.82 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 68 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00040 Uncl Excav (Spec) Cubic Yard ============================================= C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 273.00 75.00 33.97 11.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 273.00 75.00 33.97 11.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 273.00 75.00 33.97 11.50 =============== 203-00050 Unsuitable Material Cubic Yard ============================================= NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 1,419.00 30.00 28.00 35.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 50.00 55.00 91.38 100.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC PWQM240-172 El Paso County, north Colorad 01/23/20 260.00 40.00 49.50 48.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 1,479.00 20.00 26.75 15.50 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 100.00 50.00 73.26 79.79 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 35.00 100.00 96.00 96.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 200.00 40.00 72.60 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,543.00 28.73 37.29 32.01 IM0761-226 I76/SH52 Interchange 04/02/20 1,000.00 35.00 24.90 40.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 545.00 35.00 108.00 84.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 20.00 65.00 77.25 13.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 100.00 80.00 49.42 25.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 50.00 64.00 64.50 64.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,715.00 38.82 42.17 53.51 FSAC010-124 US 40, US 287, SH 88 08/06/20 15.00 55.00 143.33 250.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 500.00 50.00 59.03 30.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 550.00 60.00 53.56 29.80 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 100.00 40.00 42.57 34.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,165.00 53.93 55.53 33.14 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 3,000.00 41.48 41.48 41.48 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 69 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00050 Unsuitable Material Cubic Yard ============================================= NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 20,000.00 10.50 11.33 5.20 CR100-342 US-6 at Garrison 12/17/20 250.00 50.00 51.00 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 23,250.00 14.92 12.53 10.31 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 29,673.00 19.48 17.86 16.29 =============== 203-00060 Emb Matl (CIP) Cubic Yard ============================================= NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 4,704.00 18.00 69.07 39.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 1,840.00 27.00 68.67 55.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 250.00 50.00 58.80 51.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 8,647.00 40.00 49.00 48.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 497.00 80.00 36.77 40.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 2,181.00 14.00 36.29 45.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 153,686.00 20.00 24.36 20.84 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 592.00 20.00 49.11 60.29 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 13,669.00 15.00 32.62 30.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 192,375.00 15.00 19.28 17.50 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1,732.00 35.00 78.60 56.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 380,173.00 17.89 21.87 20.89 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 585.00 25.00 72.35 58.00 IM0761-226 I76/SH52 Interchange 04/02/20 58,002.00 17.00 22.55 17.35 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 9,589.00 22.00 28.47 18.50 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 16.00 75.00 137.50 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 68,192.00 17.79 23.62 17.86 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 763.00 15.00 24.34 26.11 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 209.00 35.00 69.75 52.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 344.00 30.00 62.50 50.00 STR184B-006 CULVERTS SH 184 08/06/20 27.00 180.00 170.00 170.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 5,300.00 45.00 34.08 25.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 11,840.00 10.00 19.11 14.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 18,483.00 21.15 24.68 19.24 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 186.00 25.00 42.60 40.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 70 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00060 Emb Matl (CIP) Cubic Yard ============================================= NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 896.00 60.00 88.67 92.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 45,695.00 14.79 14.79 14.79 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 211,739.00 13.00 10.35 7.50 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 646,360.00 12.30 13.82 13.82 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 904,876.00 12.64 11.72 12.47 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,371,724.00 14.46 17.84 15.17 =============== 203-00062 Emb Matl (CIP) (Spec) Cubic Yard ============================================= NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 1,419.00 30.00 39.63 39.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,419.00 30.00 39.63 39.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,419.00 30.00 39.63 39.00 =============== 203-00066 Emb Matl (CIP) (R40) Cubic Yard ============================================= FSA2873-194 US 287 Longmont Intersection 02/13/20 761.00 50.00 64.37 87.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 27,336.00 20.00 24.56 18.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 28,097.00 20.81 25.38 20.36 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 178,012.00 30.66 30.01 30.01 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 178,012.00 30.66 30.01 30.01 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 206,109.00 29.32 27.43 28.69 =============== 203-00100 Muck Excav Cubic Yard ============================================= NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 100.00 35.00 40.50 49.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 100.00 35.00 40.50 49.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 200.00 30.00 38.19 40.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 71 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00100 Muck Excav Cubic Yard ============================================= FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 200.00 30.00 38.19 40.00 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 50.00 80.00 126.60 99.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 50.00 80.00 126.60 99.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 350.00 38.57 45.00 51.11 =============== 203-00400 Rock Excav Cubic Yard ============================================= NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 15.00 100.00 293.70 275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15.00 100.00 293.70 275.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 3,500.00 60.00 40.74 20.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,500.00 60.00 40.74 20.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 830.00 400.00 207.26 240.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 830.00 400.00 207.26 240.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,345.00 125.09 62.66 62.91 =============== 203-00450 Rem Rock Each =================================================== IM0761-226 I76/SH52 Interchange 04/02/20 7.00 12.00 262.69 115.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7.00 12.00 262.69 115.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 12.00 262.69 115.00 =============== 203-00510 Rock Fill (Spec) Cubic Yard ============================================= NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 8,117.00 25.00 63.73 27.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8,117.00 25.00 63.73 27.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,117.00 25.00 63.73 27.10 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 72 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00592 Rock Staining Sq Foot ================================================ C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 18,178.00 2.50 3.70 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 18,178.00 2.50 3.70 2.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18,178.00 2.50 3.70 2.00 =============== 203-00598 Rock Scaling Hour =================================================== NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 300.00 230.00 231.67 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 300.00 230.00 231.67 150.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 300.00 230.00 231.67 150.00 =============== 203-00599 Rock Scaler Hour =================================================== NHPP0702-407 PR I-70 Glenwood Springs Griz 11/03/20 40.00 400.00 187.56 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 40.00 400.00 187.56 125.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 400.00 187.56 125.00 =============== 203-01100 Proof Rolling Hour =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 90.00 128.00 104.67 89.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 10.00 100.00 73.88 90.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 5.00 100.00 163.00 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 105.00 124.00 107.34 91.52 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 30.00 100.00 191.94 110.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 12.00 150.00 119.67 112.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 20.00 127.00 136.10 136.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 62.00 118.39 179.37 118.81 STM094A-038 SH94 WB PASSING LANE 09/01/20 40.00 112.66 112.66 112.66 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 73 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01100 Proof Rolling Hour =================================================== STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 10.00 100.00 106.13 98.60 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 100.00 118.67 129.71 129.71 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 150.00 115.82 119.23 123.09 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 84.00 161.70 161.70 161.70 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 40.00 100.00 118.33 101.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 200.00 101.73 127.99 127.99 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 324.00 117.06 128.97 133.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 641.00 118.04 133.58 122.71 =============== 203-01140 Rolling Hour =================================================== NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 70.00 100.00 106.67 100.01 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 20.00 125.00 82.00 82.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 90.00 105.56 104.52 96.01 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 40.00 150.00 100.30 123.28 SFTY2254-091 225 Ramp Improvements 04/09/20 10.00 200.00 137.50 155.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 16.00 90.00 126.67 119.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 66.00 143.03 110.99 127.05 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 156.00 121.41 107.43 109.14 =============== 203-01500 Blading Hour =================================================== STA0142-066 SH 14 New Raymer West 01/09/20 100.00 143.00 153.75 105.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 10.00 150.00 110.00 110.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 90.00 140.00 191.10 190.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 50.00 150.00 144.41 130.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STA006A-067 SH 6 Merino to Atwood 01/16/20 200.00 160.00 120.01 100.00 PWQM240-172 El Paso County, north Colorad 01/23/20 8.00 150.00 271.50 333.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 10.00 150.00 159.60 108.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 74 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01500 Blading Hour =================================================== STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 110.00 150.00 144.19 140.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 40.00 145.00 152.70 135.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 100.00 150.00 109.29 125.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 90.00 150.00 115.00 110.01 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 20.00 180.00 107.00 95.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 20.00 125.00 93.00 93.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 50.00 150.00 77.33 90.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 20.00 155.00 155.62 154.34 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 40.00 150.00 168.33 230.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 104.00 150.00 165.63 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,062.00 150.38 145.50 130.22 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 40.00 150.00 117.12 117.87 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 20.00 140.00 130.50 120.00 IM0761-226 I76/SH52 Interchange 04/02/20 40.00 150.00 144.20 105.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 20.00 150.00 96.67 30.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 40.00 150.00 134.37 119.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 30.00 100.00 90.00 100.00 SFTY2254-091 225 Ramp Improvements 04/09/20 30.00 200.00 172.50 175.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 100.00 175.00 176.96 130.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 16.00 180.00 169.00 159.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 40.00 150.00 149.75 115.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 25.00 150.00 136.19 110.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 40.00 214.00 237.53 237.53 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 50.00 160.00 137.38 150.00 NH050A-037 US 50A Pueblo Regional Pond -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 491.00 161.89 151.32 132.02 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 24.00 150.00 259.88 300.00 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 40.00 160.00 173.11 226.58 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 20.00 250.00 182.50 125.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 80.00 156.36 149.56 160.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 40.00 192.19 192.19 192.19 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 50.00 150.00 135.97 145.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 40.00 140.00 199.68 148.90 CR400-374 FY 20 Culvert Prioritization 09/17/20 9.00 156.00 212.50 150.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 40.00 200.15 230.94 230.94 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 343.00 168.24 169.85 183.80 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 75 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01500 Blading Hour =================================================== STRM331-008 ADA RAMPS WALSENBURG 10/15/20 20.00 175.00 115.00 75.00 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 15.00 140.00 123.52 168.60 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 40.00 200.00 129.00 127.00 NHPP0702-407 PR I-70 Glenwood Springs Griz 11/03/20 20.00 80.00 291.08 135.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 185.00 150.00 141.67 135.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 40.00 150.00 143.57 122.00 C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 20.00 80.00 162.31 151.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 20.00 125.00 137.50 130.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 20.00 170.00 179.28 149.00 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 40.00 125.00 196.73 155.71 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 42.00 220.50 220.50 220.50 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 200.00 170.00 151.00 144.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 200.00 200.15 213.81 213.81 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 862.00 167.91 157.68 159.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,758.00 160.13 153.94 146.29 =============== 203-01510 Backhoe Hour =================================================== PWQM240-172 El Paso County, north Colorad 01/23/20 8.00 125.00 211.50 183.00 STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 40.00 135.00 210.00 210.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 4.00 150.00 254.55 339.60 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 50.00 150.00 123.50 115.00 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 20.00 220.00 94.00 78.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 20.00 125.00 125.85 120.94 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 40.00 150.00 144.83 240.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 182.00 150.55 137.02 167.86 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 10.00 150.00 87.50 81.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 10.00 50.00 75.00 100.00 SFTY2254-091 225 Ramp Improvements 04/09/20 30.00 200.00 192.50 160.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 40.00 219.00 231.52 231.52 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 50.00 125.00 110.81 75.00 NH050A-037 US 50A Pueblo Regional Pond IM025A-048 Northbound I-25 bridge at Exi 05/28/20 10.00 140.00 174.53 130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 150.00 162.73 129.16 139.47 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 76 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01510 Backhoe Hour =================================================== STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 4.00 141.00 165.00 120.00 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 20.00 160.00 175.00 125.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 80.00 146.25 134.01 140.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 40.00 204.71 225.37 225.37 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 144.00 164.25 141.75 161.08 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 20.00 150.00 100.00 75.00 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 15.00 130.00 99.40 130.00 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 120.00 120.00 115.23 85.70 NHPP0702-407 PR I-70 Glenwood Springs Griz 11/03/20 20.00 80.00 176.72 165.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 195.00 150.00 131.67 110.00 C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 20.00 80.00 181.05 101.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 20.00 150.00 113.25 110.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 42.00 199.50 199.50 199.50 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 40.00 100.00 123.75 124.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 200.00 204.71 223.47 223.47 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 692.00 156.24 139.83 145.57 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,168.00 157.18 138.13 150.17 =============== 203-01550 Dozing Hour =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 10.00 175.00 150.00 150.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 90.00 150.00 197.99 210.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 20.00 160.00 162.97 140.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC PWQM240-172 El Paso County, north Colorad 01/23/20 8.00 150.00 320.00 350.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 104.00 150.00 175.00 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 232.00 151.94 180.48 179.31 IM0761-226 I76/SH52 Interchange 04/02/20 40.00 160.00 157.17 105.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 10.00 100.00 90.00 100.00 SFTY2254-091 225 Ramp Improvements 04/09/20 30.00 200.00 202.50 180.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 77 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01550 Dozing Hour =================================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 100.00 160.00 193.14 175.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 10.00 160.00 156.42 110.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 40.00 154.00 283.66 283.66 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 50.00 180.00 160.94 150.00 NH050A-037 US 50A Pueblo Regional Pond -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 280.00 164.86 178.86 171.59 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 40.00 175.00 177.06 206.98 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 20.00 200.00 200.00 200.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 80.00 176.45 170.21 160.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 40.00 144.00 277.69 277.69 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 180.00 171.53 177.16 201.04 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 15.00 160.00 139.92 168.60 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 40.00 200.00 155.33 146.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 130.00 200.00 171.67 130.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 42.00 225.75 225.75 225.75 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 40.00 175.00 196.83 248.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 200.00 144.00 260.56 260.56 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 467.00 174.91 192.05 207.24 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,159.00 167.36 181.79 192.08 =============== 203-01565 Hydraulic Excavator Hour =================================================== FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 10.00 180.00 166.33 179.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 180.00 166.33 179.00 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 40.00 180.00 146.00 105.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 40.00 180.00 146.00 105.00 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 34.00 180.00 127.12 168.60 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 78 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01565 Hydraulic Excavator Hour =================================================== NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 40.00 180.00 177.50 144.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 74.00 180.00 156.61 155.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 124.00 180.00 153.75 140.99 =============== 203-01580 Truck Hour =================================================== STR0341-101 SH 34 North of Grandby Resurf 04/02/20 40.00 125.00 125.75 123.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 40.00 125.00 125.75 123.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 40.00 150.00 101.04 105.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 40.00 150.00 101.04 105.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 80.00 137.50 115.16 114.33 =============== 203-01582 Truck (Dump) Hour =================================================== STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 20.00 155.00 104.00 123.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 10.00 120.00 128.76 157.52 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 20.00 200.00 104.00 85.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 10.00 150.00 90.00 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 60.00 163.33 107.23 110.59 SFTY2254-091 225 Ramp Improvements 04/09/20 20.00 200.00 130.00 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20.00 200.00 130.00 150.00 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 40.00 116.00 157.25 200.00 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 40.00 130.00 110.00 95.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 80.00 123.00 131.00 147.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 79 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01582 Truck (Dump) Hour =================================================== CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 75.00 120.00 93.00 111.00 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 120.00 120.00 122.00 136.00 NHPP0702-407 PR I-70 Glenwood Springs Griz 11/03/20 20.00 80.00 136.05 120.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 99.00 130.00 135.67 140.00 C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 20.00 80.00 117.90 93.50 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 20.00 140.00 116.10 110.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 146.00 150.00 126.96 100.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 40.00 100.00 112.33 118.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 540.00 126.24 119.49 119.06 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 700.00 131.16 120.65 122.47 =============== 203-01590 Front End Loader (Rubber) Hour =================================================== NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 25.00 120.00 190.01 210.02 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 25.00 120.00 190.01 210.02 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 10.00 160.00 105.00 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 160.00 105.00 120.00 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 40.00 160.00 197.00 200.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 20.00 150.00 123.67 110.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 20.00 150.00 140.45 112.26 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 40.00 150.00 128.80 95.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 120.00 153.33 148.56 135.38 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 120.00 150.00 157.33 147.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 85.00 150.00 173.33 140.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 73.00 175.00 166.68 111.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 80 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01590 Front End Loader (Rubber) Hour =================================================== NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 40.00 150.00 141.83 150.00 CR100-342 US-6 at Garrison 12/17/20 20.00 150.00 102.50 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 338.00 155.40 155.24 130.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 493.00 153.19 153.42 135.37 =============== 203-01594 Combination Loader Hour =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 10.00 130.00 100.00 100.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 10.00 120.00 176.11 185.00 PWQM240-172 El Paso County, north Colorad 01/23/20 8.00 150.00 140.00 110.00 STR141A-044 SH 141 AND SH 145, FROM SLICK 01/30/20 10.00 200.00 133.06 80.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 20.00 122.00 99.00 99.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 40.00 150.00 131.67 110.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 20.00 125.00 141.00 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 118.00 141.02 136.00 117.88 IM0761-226 I76/SH52 Interchange 04/02/20 40.00 120.00 109.94 105.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 22.00 130.00 83.33 30.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 40.00 125.00 120.51 78.80 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 10.00 100.00 75.00 100.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 16.00 120.00 134.33 112.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 10.00 105.00 98.33 100.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 40.00 176.00 183.00 183.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 178.00 132.98 114.57 107.44 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 40.00 110.00 177.13 200.00 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 30.00 130.00 128.14 109.96 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 20.00 150.00 175.00 125.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 30.00 210.00 117.50 125.00 STR184B-006 CULVERTS SH 184 08/06/20 25.00 150.00 110.00 110.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 20.00 120.00 168.57 65.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 40.00 164.58 181.43 181.43 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 205.00 147.97 153.58 140.76 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 45.00 120.00 102.20 127.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 81 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01594 Combination Loader Hour =================================================== NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 40.00 125.00 120.23 85.70 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 40.00 150.00 143.38 130.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 200.00 164.58 164.49 164.49 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 325.00 151.74 131.62 145.36 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 826.00 145.23 133.66 132.12 =============== 203-01597 Potholing Hour =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 50.00 250.00 204.04 190.00 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 16.00 300.00 281.67 300.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 50.00 250.00 226.33 264.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 20.00 250.00 277.95 250.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 40.00 400.00 310.00 260.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 20.00 250.00 307.52 315.03 PWQM240-172 El Paso County, north Colorad 01/23/20 40.00 250.00 310.00 290.00 STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 10.00 300.00 670.00 670.00 STR141A-044 SH 141 AND SH 145, FROM SLICK 01/30/20 8.00 500.00 389.20 500.00 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 200.00 250.00 169.00 170.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 20.00 250.00 255.60 238.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 60.00 210.00 336.67 300.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 20.00 260.00 293.00 300.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 10.00 200.00 256.83 240.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 60.00 460.00 266.36 275.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 100.00 300.00 212.50 325.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 40.00 235.00 304.69 275.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 120.00 175.00 220.00 120.01 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 80.00 400.00 287.50 300.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 40.00 400.00 385.00 385.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 10.00 200.00 406.08 462.15 STRR300-249 Grand and Jackson Counties AD 03/05/20 40.00 250.00 410.00 380.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 80.00 250.00 393.33 270.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 100.00 260.00 313.75 300.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 80.00 250.00 192.60 279.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 40.00 250.00 344.20 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,354.00 274.45 268.29 264.55 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 40.00 400.00 380.80 676.79 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 100.00 300.00 414.50 450.00 IM0761-226 I76/SH52 Interchange 04/02/20 200.00 250.00 264.84 196.10 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 82 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01597 Potholing Hour =================================================== STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 40.00 310.00 325.00 310.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 40.00 300.00 293.56 314.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 10.00 260.00 231.25 312.50 SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 150.00 300.00 275.00 275.00 SFTY2254-091 225 Ramp Improvements 04/09/20 60.00 300.00 295.00 240.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 275.00 270.00 260.47 203.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 80.00 240.00 256.67 185.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 40.00 300.00 395.00 500.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 60.00 300.00 352.67 286.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 20.00 230.00 254.38 235.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 260.00 230.00 223.33 175.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 8.00 275.00 355.53 275.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 250.00 200.00 214.75 212.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 30.00 230.00 158.33 250.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 80.00 360.00 368.59 368.59 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 250.00 200.00 155.70 1.00 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 80.00 275.00 125.00 50.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 20.00 350.00 261.67 225.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 175.00 250.00 173.60 175.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,268.00 257.72 239.96 213.72 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 42.00 200.00 174.71 137.00 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 8.00 350.00 325.00 325.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 200.00 265.00 232.50 265.00 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 20.00 240.00 305.00 325.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 90.00 300.00 240.00 225.00 STR184B-006 CULVERTS SH 184 08/06/20 40.00 250.00 260.00 260.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 30.00 250.00 135.00 80.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 72.00 184.82 184.82 184.82 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 80.00 250.00 279.99 214.94 MTCE0702-386 Grand Junction 09/03/20 150.00 400.00 198.33 270.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 100.00 200.00 289.86 350.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 100.00 200.00 308.84 237.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 80.00 250.00 297.70 143.90 SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 175.00 250.00 187.50 100.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 72.00 55.00 199.86 160.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 160.00 336.00 306.32 306.32 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,419.00 259.53 253.80 225.62 MTCE0253-271 FY20 I-25 SIGN REPL PHASE 1 10/08/20 40.00 275.00 381.67 250.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 83 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01597 Potholing Hour =================================================== CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 48.00 250.00 333.20 250.00 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 200.00 400.00 255.70 317.09 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 80.00 350.00 335.33 301.00 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 300.00 200.00 139.22 1.00 NHPP0702-407 PR I-70 Glenwood Springs Griz 11/03/20 60.00 300.00 289.32 250.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 100.00 300.00 351.67 385.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 60.00 350.00 320.25 350.00 C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 60.00 300.00 430.00 533.00 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 20.00 250.00 261.75 212.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 20.00 250.00 267.25 277.00 FSA1211-098 SH 121 & 1ST AVE 11/19/20 60.00 250.00 218.67 175.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 100.00 225.00 387.50 250.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 80.00 300.00 310.20 220.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 40.00 250.00 338.84 530.00 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 100.00 275.00 350.20 320.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 100.00 250.00 285.00 320.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 100.00 210.00 210.00 210.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 80.00 300.00 359.00 402.00 CR100-342 US-6 at Garrison 12/17/20 100.00 225.00 235.83 20.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 200.00 346.00 302.92 302.92 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,948.00 281.67 266.90 246.46 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,989.00 268.00 254.96 235.11 =============== 203-01620 Sweeping Hour =================================================== STR2871-038 US 287 Passing Lanes Springfi 03/05/20 10.00 100.00 129.25 58.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 100.00 129.25 58.50 MTCER200-265 Pueblo 05/28/20 100.00 150.00 143.75 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 100.00 150.00 143.75 50.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 84.00 125.00 200.00 215.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 84.00 125.00 200.00 215.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 194.00 136.60 159.33 121.88 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 84 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01622 Sweeping (With Pickup Broom) Hour =================================================== NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 40.00 170.00 242.10 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 40.00 170.00 242.10 350.00 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 40.00 260.00 164.05 300.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 50.00 175.00 148.00 145.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 90.00 212.78 153.58 213.89 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 130.00 199.62 171.90 255.77 =============== 203-02300 Rock Scaler Hour =================================================== C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 1,872.00 160.00 198.50 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,872.00 160.00 198.50 120.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 400.00 100.00 184.14 160.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 400.00 100.00 184.14 160.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,272.00 149.44 195.47 127.04 =============== 203-02315 Mechanized Scaling Hour =================================================== C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 155.00 500.00 287.50 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 155.00 500.00 287.50 200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 155.00 500.00 287.50 200.00 =============== 203-02330 Laborer Hour =================================================== STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 40.00 45.00 36.75 38.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 85 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-02330 Laborer Hour =================================================== NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 30.00 50.00 56.26 52.51 PWQM240-172 El Paso County, north Colorad 01/23/20 24.00 55.00 42.00 44.00 STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 20.00 45.00 60.00 60.00 STR141A-044 SH 141 AND SH 145, FROM SLICK 01/30/20 20.00 75.00 58.53 35.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 6.00 80.00 129.94 194.88 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 50.00 60.00 85.84 60.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 20.00 50.00 51.00 50.00 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 10.00 40.00 36.00 37.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 40.00 50.00 32.00 32.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 40.00 55.00 45.10 62.71 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 40.00 80.00 48.78 62.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 340.00 56.76 55.44 52.59 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 24.00 80.00 67.31 90.17 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 60.00 50.00 33.33 20.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 40.00 60.00 57.06 35.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 60.00 50.00 41.88 43.75 SFTY2254-091 225 Ramp Improvements 04/09/20 40.00 65.00 62.00 60.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 80.00 55.00 52.80 55.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1601-082 Hawkins Signal and Curb Ramps 04/30/20 20.00 50.00 56.33 71.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 24.00 30.00 57.67 79.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 40.00 46.00 45.53 45.53 IM025A-048 Northbound I-25 bridge at Exi 05/28/20 75.00 52.00 66.98 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 463.00 53.52 53.47 49.03 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 40.00 50.00 84.00 50.00 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 20.00 52.00 51.67 35.00 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 40.00 60.00 72.50 45.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 30.00 60.00 47.50 45.00 STR184B-006 CULVERTS SH 184 08/06/20 25.00 50.00 55.00 55.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 40.00 52.91 52.91 52.91 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 40.00 45.00 98.66 57.30 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 40.00 60.00 61.16 55.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 40.00 46.68 48.47 48.47 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 315.00 52.93 72.35 50.07 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 120.00 45.00 43.76 40.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 86 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-02330 Laborer Hour =================================================== NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 80.00 80.00 57.50 40.50 NHPP0702-407 PR I-70 Glenwood Springs Griz 11/03/20 20.00 120.00 93.54 65.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 80.00 50.00 56.67 50.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 40.00 60.00 54.07 46.25 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 40.00 50.00 56.00 33.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 50.00 50.00 69.50 34.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 20.00 50.00 49.90 65.00 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 40.00 45.00 71.00 36.62 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 40.00 55.00 64.54 40.50 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 120.00 45.00 68.50 95.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 42.00 53.38 53.38 53.38 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 140.00 45.00 53.50 44.80 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 200.00 46.68 52.29 52.29 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,032.00 51.72 55.63 51.38 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,150.00 53.08 57.22 50.87 =============== 206-00000 Str Excav Cubic Yard ============================================= NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 10.00 50.00 299.94 599.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 1,585.00 20.00 19.56 15.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 429.00 60.00 33.70 20.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 338.00 40.00 58.00 58.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 968.00 30.00 22.84 16.23 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 2,942.00 30.00 24.92 30.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 636.00 30.00 23.88 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6,908.00 30.09 23.94 25.74 IM0761-226 I76/SH52 Interchange 04/02/20 335.00 25.00 31.44 14.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 153.00 30.00 66.33 58.00 SFTY2254-091 225 Ramp Improvements 04/09/20 461.00 30.00 57.50 74.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 20,532.00 20.00 12.16 8.13 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 1,040.00 22.00 21.30 30.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1,220.00 36.00 42.41 42.41 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 23,741.00 21.24 13.47 12.53 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 868.00 28.00 24.20 22.42 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 87 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00000 Str Excav Cubic Yard ============================================= STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 73.00 45.00 15.88 20.00 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 532.00 50.00 60.00 60.00 STR184B-006 CULVERTS SH 184 08/06/20 71.00 50.00 75.00 75.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 295.00 38.77 38.81 27.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 6,920.00 20.00 27.34 5.80 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 17,651.00 16.07 21.80 21.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 26,410.00 18.60 26.42 18.59 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 383.00 25.00 51.60 36.40 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 15.00 40.00 91.50 106.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 810.00 19.53 19.53 19.53 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 3,483.00 25.00 18.22 7.70 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 4,805.00 16.98 14.87 14.87 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9,496.00 20.50 20.09 13.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 66,555.00 21.00 18.23 16.47 =============== 206-00010 Str Excav (Spec) Cubic Yard ============================================= C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 1,340.00 100.00 114.30 99.50 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 263.00 40.00 59.38 24.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,603.00 90.16 105.29 87.19 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,603.00 90.16 105.29 87.19 =============== 206-00050 Str Bkfl (Spec) Cubic Yard ============================================= NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 4.00 80.00 240.00 240.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 80.00 240.00 240.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1,235.00 57.39 53.72 53.72 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,235.00 57.39 53.72 53.72 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1,235.00 65.00 67.16 67.16 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,235.00 65.00 67.16 67.16 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,474.00 61.23 60.73 60.73 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 88 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00060 Str Bkfl (Spec) (Flow-Fill) Cubic Yard ============================================= NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 2.00 417.00 1566.20 2539.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 445.00 180.00 238.64 160.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 447.00 181.06 240.87 170.64 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 50.00 160.00 288.33 265.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 50.00 160.00 288.33 265.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 497.00 178.94 242.79 180.14 =============== 206-00065 Str Bkfl (Flow-Fill) Cubic Yard ============================================= NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 1,357.00 200.00 220.38 212.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 2.00 500.00 715.00 730.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 46.00 250.00 236.50 236.50 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 35.00 350.00 311.67 270.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,440.00 205.66 223.29 214.91 IM0761-226 I76/SH52 Interchange 04/02/20 170.00 200.00 213.60 131.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 163.00 40.00 124.00 90.00 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 75.00 400.00 200.00 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 408.00 172.84 188.53 118.11 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 57.00 400.00 205.00 200.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 6.00 700.00 320.00 390.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 3.00 410.00 677.43 200.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 25.00 300.00 228.64 150.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 150.00 215.00 222.19 192.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 241.00 282.07 229.41 195.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 156.00 320.00 342.50 405.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 89 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00065 Str Bkfl (Flow-Fill) Cubic Yard ============================================= NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 128.40 300.00 350.33 335.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 20.00 104.70 241.43 241.43 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 304.40 297.42 346.14 364.73 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,393.40 219.43 232.70 215.46 =============== 206-00066 Str Bkfl (FF Ash) Cubic Yard ============================================= NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 727.00 125.00 325.00 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 727.00 125.00 325.00 300.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 353.00 104.70 169.97 169.97 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 353.00 104.70 169.97 169.97 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,080.00 118.36 294.71 257.50 =============== 206-00100 Str Bkfl (CL 1) Cubic Yard ============================================= BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 1,220.00 40.00 82.59 64.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 302.00 60.00 73.40 63.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 40.00 123.00 78.52 50.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 10.00 100.00 485.73 310.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 78.00 60.00 83.00 83.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 2,208.00 60.00 61.72 60.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 15,652.00 45.00 27.70 23.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 19,510.00 46.87 32.84 30.81 IM0761-226 I76/SH52 Interchange 04/02/20 70.00 225.00 71.86 68.90 SFTY2254-091 225 Ramp Improvements 04/09/20 301.00 50.00 104.00 135.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 3,100.00 30.00 40.86 45.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 555.00 80.00 82.69 63.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1,802.00 67.00 70.57 70.57 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,828.00 49.58 50.51 59.56 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 90 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00100 Str Bkfl (CL 1) Cubic Yard ============================================= STR184B-006 CULVERTS SH 184 08/06/20 9.00 200.00 230.00 230.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 285.00 69.97 80.75 66.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 18.00 25.21 25.21 25.21 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 10,152.00 45.00 48.01 39.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 10,193.00 42.86 47.07 47.07 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20,657.00 44.34 48.80 43.43 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 133.00 50.00 134.77 136.65 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 53.00 60.00 142.00 148.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 925.00 50.93 50.93 50.93 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 5,126.00 50.00 50.70 46.40 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 10,610.00 39.04 43.44 43.44 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 16,847.00 43.18 50.66 45.82 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 62,842.00 45.30 41.77 41.65 =============== 206-00200 Str Bkfl (CL 2) Cubic Yard ============================================= NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 2.00 41.00 493.95 846.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 240.00 25.00 32.88 9.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 192.00 75.00 50.00 40.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 400.00 40.00 38.98 17.90 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 433.00 55.00 29.35 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,267.00 47.59 35.65 22.27 IM0761-226 I76/SH52 Interchange 04/02/20 138.00 25.00 48.65 10.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 16,435.00 35.00 19.70 22.25 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 60.00 30.00 27.35 7.50 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 207.00 66.00 38.37 38.37 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16,840.00 35.28 19.97 22.30 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 91 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00200 Str Bkfl (CL 2) Cubic Yard ============================================= NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 54.00 45.00 28.63 37.57 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 781.00 15.67 32.53 32.53 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 835.00 17.57 31.39 32.86 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1,070.00 35.70 32.46 32.46 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,070.00 35.70 32.46 32.46 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20,012.00 35.34 21.09 23.28 =============== 206-00360 Mechanical Reinforcement of Soil Cubic Yard ============================================= BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 1,220.00 27.00 20.67 13.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 290.00 50.00 65.05 120.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 8,935.00 26.00 17.59 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10,445.00 26.78 18.39 15.12 IM0761-226 I76/SH52 Interchange 04/02/20 70.00 20.00 43.36 21.20 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 13,003.00 19.00 18.23 18.99 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 555.00 28.00 26.20 7.50 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 342.00 19.00 27.49 27.49 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 13,970.00 19.36 18.73 18.75 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 5,033.00 13.24 14.74 14.74 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5,033.00 13.24 14.74 14.74 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 905.00 24.15 24.15 24.15 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 92 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00360 Mechanical Reinforcement of Soil Cubic Yard ============================================= NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 267.00 35.00 40.80 31.10 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 4,211.00 13.24 20.03 20.03 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5,383.00 16.15 25.54 21.27 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 34,831.00 20.21 18.72 17.47 =============== 206-00505 Filter Matl (Spec) Cubic Yard ============================================= NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 21,112.00 16.00 48.19 47.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 21,112.00 16.00 48.19 47.00 C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 256.00 100.00 104.27 88.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 256.00 100.00 104.27 88.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21,368.00 17.01 48.61 47.49 =============== 206-00510 Filter Matl (CL A) Cubic Yard ============================================= NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 103.00 75.00 84.14 89.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 103.00 75.00 84.14 89.00 IM0761-226 I76/SH52 Interchange 04/02/20 6.00 90.00 158.73 197.72 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 4.00 300.00 217.88 260.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 58.00 259.00 134.83 134.83 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 68.00 246.50 162.57 147.74 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 139.00 57.00 99.21 75.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 10,375.00 69.68 67.02 67.02 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10,514.00 69.51 69.78 67.13 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 93 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00510 Filter Matl (CL A) Cubic Yard ============================================= C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 1,152.00 90.00 101.62 93.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 2,101.00 95.00 90.78 75.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1,272.00 92.40 92.40 92.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,525.00 93.00 94.46 84.47 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15,210.00 77.33 85.09 72.80 =============== 206-00520 Filter Matl (CL B) Cubic Yard ============================================= NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 63.00 80.00 132.80 144.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 30.00 55.00 120.47 128.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 93.00 71.94 127.47 138.84 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 93.00 71.94 127.47 138.84 =============== 206-00530 Filter Matl (CL C) Cubic Yard ============================================= SFTY2254-091 225 Ramp Improvements 04/09/20 96.00 150.00 152.50 165.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 96.00 150.00 152.50 165.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 96.00 95.00 133.90 93.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 96.00 95.00 133.90 93.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 192.00 122.50 139.21 129.00 =============== 206-01000 Bed Course Matl Cubic Yard ============================================= NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 11.00 50.00 208.12 47.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 11.00 50.00 208.12 47.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 50.00 208.12 47.35 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 94 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-01750 Shoring LUMP SUM =============================================== STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 1.00 15000.00 16033.33 24200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 15000.00 16033.33 24200.00 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 1.00 23000.00 34750.00 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 23000.00 34750.00 2500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 19000.00 23520.00 13350.00 =============== 206-01781 Shoring (A 1) LUMP SUM =============================================== BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 1.00 20000.00 42083.33 25000.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 20000.00 42083.33 25000.00 IM0761-226 I76/SH52 Interchange 04/02/20 1.00 16000.00 16323.53 14499.70 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1.00 26000.00 22978.46 22978.46 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 21000.00 17155.40 18739.08 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 1.00 55000.00 106334.22 135000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 55000.00 106334.22 135000.00 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 1.00 30000.00 29141.00 87065.00 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 1.00 4000.00 33325.00 37000.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1.00 17850.00 17850.00 17850.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 1.00 170000.00 146875.00 191700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 55462.50 73631.56 83403.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 42356.25 62491.56 66386.65 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 95 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-01782 Shoring (A 2) LUMP SUM =============================================== BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 1.00 20000.00 46416.67 28000.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 20000.00 46416.67 28000.00 IM0761-226 I76/SH52 Interchange 04/02/20 1.00 16000.00 15689.24 14499.70 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1.00 26000.00 22978.46 22978.46 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 21000.00 16600.40 18739.08 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 1.00 10000.00 54872.48 55000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 10000.00 54872.48 55000.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1.00 17850.00 17850.00 17850.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 1.00 150000.00 103650.00 34350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 83925.00 91392.86 26100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 39975.00 51255.73 28779.69 =============== 206-01783 Shoring (A 3) LUMP SUM =============================================== IM0761-226 I76/SH52 Interchange 04/02/20 1.00 6000.00 10991.43 6200.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1.00 22000.00 19348.96 19348.96 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 14000.00 12036.12 12774.48 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1.00 17850.00 17850.00 17850.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 17850.00 17850.00 17850.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 15283.33 12682.11 14466.32 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 96 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-01784 Shoring (A 4) LUMP SUM =============================================== FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1.00 17850.00 17850.00 17850.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 17850.00 17850.00 17850.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 17850.00 17850.00 17850.00 =============== 206-01786 Shoring (A 6) LUMP SUM =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 41066.39 65410.73 65410.73 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 41066.39 65410.73 65410.73 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 41066.39 65410.73 65410.73 =============== 206-01787 Shoring (A 7) LUMP SUM =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 41066.39 72633.23 72633.23 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 41066.39 72633.23 72633.23 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 41066.39 72633.23 72633.23 =============== 206-01788 Shoring (A 8) LUMP SUM =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 31940.54 13081.12 13081.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 31940.54 13081.12 13081.12 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 31940.54 13081.12 13081.12 =============== 206-01789 Shoring (A 9) LUMP SUM =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 31940.54 13081.12 13081.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 31940.54 13081.12 13081.12 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 31940.54 13081.12 13081.12 =============== 206-01790 Shoring (A 10) LUMP SUM =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 25192.26 34638.78 34638.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 25192.26 34638.78 34638.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 25192.26 34638.78 34638.78 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 97 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-01791 Shoring (A 11) LUMP SUM =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 25000.00 8322.76 8322.76 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 25000.00 8322.76 8322.76 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 25000.00 8322.76 8322.76 =============== 206-01792 Shoring (A 12) LUMP SUM =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 25192.26 34638.78 34638.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 25192.26 34638.78 34638.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 25192.26 34638.78 34638.78 =============== 206-01793 Shoring (A 13) LUMP SUM =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 25000.00 8322.76 8322.76 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 25000.00 8322.76 8322.76 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 25000.00 8322.76 8322.76 =============== 206-01794 Shoring (A 14) LUMP SUM =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 25192.26 34638.78 34638.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 25192.26 34638.78 34638.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 25192.26 34638.78 34638.78 =============== 206-01795 Shoring (A 15) LUMP SUM =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 25000.00 8322.76 8322.76 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 25000.00 8322.76 8322.76 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 25000.00 8322.76 8322.76 =============== 206-01796 Shoring (A 16) LUMP SUM =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 25192.26 34638.78 34638.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 25192.26 34638.78 34638.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 25192.26 34638.78 34638.78 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 98 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-01797 Shoring (A 17) LUMP SUM =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 25000.00 8322.76 8322.76 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 25000.00 8322.76 8322.76 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 25000.00 8322.76 8322.76 =============== 206-01798 Shoring (A 18) LUMP SUM =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 18251.73 29435.99 29435.99 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 18251.73 29435.99 29435.99 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 18251.73 29435.99 29435.99 =============== 206-01799 Shoring (A 19) LUMP SUM =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 18251.73 29435.99 29435.99 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 18251.73 29435.99 29435.99 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 18251.73 29435.99 29435.99 =============== 206-01800 Shoring (A 20) LUMP SUM =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 25839.80 14632.85 14632.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 25839.80 14632.85 14632.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 25839.80 14632.85 14632.85 =============== 206-01801 Shoring (A 21) LUMP SUM =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 35236.12 40463.47 40463.47 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 35236.12 40463.47 40463.47 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 35236.12 40463.47 40463.47 =============== 207-00205 Topsoil Cubic Yard ============================================= FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 1,612.00 17.00 20.00 20.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 99 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 207-00205 Topsoil Cubic Yard ============================================= BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 905.00 15.00 14.29 8.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC PWQM240-172 El Paso County, north Colorad 01/23/20 3,765.00 20.00 54.50 62.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 135.00 92.00 47.67 33.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 2,243.00 40.00 52.18 59.48 STR0101-027 SH 10 Overlay La Junta West 02/27/20 160.00 25.00 48.06 52.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 61,063.00 25.00 25.32 18.70 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 46.00 150.00 140.00 140.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 3,058.00 5.00 9.07 8.35 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 731.00 13.00 18.41 8.97 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 3,120.00 10.00 43.33 12.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 13,982.00 8.00 27.62 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 90,820.00 21.18 27.07 20.49 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 451.00 30.00 28.67 45.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 1,838.00 10.00 15.00 12.50 SFTY2254-091 225 Ramp Improvements 04/09/20 915.00 25.00 51.50 51.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 835.00 15.00 31.39 15.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 50.00 12.00 91.33 126.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 10.00 50.00 262.33 640.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 3,150.00 12.00 7.15 4.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 13,750.00 8.20 8.55 8.55 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 15,060.00 10.00 15.31 10.00 NH050A-037 US 50A Pueblo Regional Pond -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 36,059.00 10.25 14.80 10.98 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 832.00 13.00 14.56 20.78 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 52.00 53.00 54.67 110.00 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 98.00 20.00 77.00 55.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 296.00 25.00 51.50 55.00 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 497.00 30.00 25.00 25.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 1,752.00 22.41 9.64 6.40 STM094A-038 SH94 WB PASSING LANE 09/01/20 2,445.00 24.56 24.56 24.56 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1,842.00 17.00 15.05 8.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 6,644.00 5.00 7.38 5.90 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 2,367.00 5.00 12.71 2.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 16,825.00 12.69 11.20 11.19 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 446.00 18.00 25.59 34.15 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 100 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 207-00205 Topsoil Cubic Yard ============================================= NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 200.00 45.00 149.00 142.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 519.00 90.00 124.33 140.00 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 1,000.00 15.00 46.44 42.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 4,952.00 7.04 7.04 7.04 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 32,130.00 5.00 4.53 3.45 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 138,488.00 6.58 6.79 6.79 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 177,735.00 6.67 6.89 7.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 321,439.00 11.49 15.92 11.48 =============== 207-00210 Stockpile Topsoil Cubic Yard ============================================= FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 560.00 6.00 23.13 22.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 1,612.00 8.00 15.00 15.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 905.00 8.00 10.24 5.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 573.00 6.00 9.35 7.31 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,650.00 7.38 12.26 12.39 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 451.00 7.50 19.33 28.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 835.00 10.00 7.81 2.55 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 3,150.00 7.00 5.08 3.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 19,835.00 5.70 5.97 5.97 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 24,271.00 6.05 6.12 5.88 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 832.00 7.00 10.64 14.40 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 497.00 30.00 24.00 24.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 1,752.00 10.58 6.31 5.30 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1,816.00 12.00 8.64 2.50 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 2,218.00 4.00 9.21 1.70 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 20,980.00 9.00 9.11 9.11 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 28,095.00 9.21 8.69 8.28 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 446.00 10.00 23.06 31.40 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 101 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 207-00210 Stockpile Topsoil Cubic Yard ============================================= NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 405.00 30.00 41.30 25.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 4,952.00 5.78 5.78 5.78 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 32,000.00 7.00 3.55 3.10 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 138,488.00 2.84 5.48 5.48 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 176,291.00 3.76 4.63 5.17 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 232,307.00 4.71 5.60 5.73 =============== 207-00305 Wetland Topsoil Cubic Yard ============================================= BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 55.00 30.00 28.81 20.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 55.00 30.00 28.81 20.00 IM0761-226 I76/SH52 Interchange 04/02/20 820.00 18.00 15.46 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 820.00 18.00 15.46 11.00 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 3.00 40.00 100.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 40.00 100.00 100.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 52.00 65.00 88.25 45.50 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1,130.00 20.56 16.35 16.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,182.00 22.52 31.91 17.63 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,060.00 20.94 19.24 15.18 =============== 207-00310 Stockpile Wetland Topsoil Cubic Yard ============================================= BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 55.00 20.00 23.74 16.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 55.00 20.00 23.74 16.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 102 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 207-00310 Stockpile Wetland Topsoil Cubic Yard ============================================= IM0761-226 I76/SH52 Interchange 04/02/20 820.00 19.00 14.96 11.99 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 820.00 19.00 14.96 11.99 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 3.00 50.00 100.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 50.00 100.00 100.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1,130.00 17.01 13.46 13.46 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,130.00 17.01 13.46 13.46 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,008.00 17.95 15.16 13.06 =============== 207-00405 Topsoil (Spec) Cubic Yard ============================================= FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 79.00 107.14 107.14 107.14 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 79.00 107.14 107.14 107.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 79.00 107.14 107.14 107.14 =============== 207-00700 Topsoil (Onsite) Cubic Yard ============================================= SHE 0703-461 I-70 and Kipling North Phase 03/26/20 303.00 28.00 33.00 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 303.00 28.00 33.00 21.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 1,220.00 10.00 17.35 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,220.00 10.00 17.35 10.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 103 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 207-00700 Topsoil (Onsite) Cubic Yard ============================================= SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 646.00 12.50 50.00 85.00 STR184B-006 CULVERTS SH 184 08/06/20 121.00 25.00 46.50 46.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 767.00 14.47 49.70 78.93 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,290.00 13.88 22.34 34.54 =============== 207-00702 Topsoil (Offsite) Cubic Yard ============================================= C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 206.00 50.00 82.50 115.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 206.00 50.00 82.50 115.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 206.00 50.00 82.50 115.00 =============== 207-00703 Topsoil (Wetlnd) Cubic Yard ============================================= FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 201.00 20.00 28.27 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 201.00 20.00 28.27 20.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 201.00 20.00 28.27 20.00 =============== 207-00704 Sub Soil Prep Sq Yard ================================================ SHE 0703-461 I-70 and Kipling North Phase 03/26/20 2,015.00 1.00 5.44 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,015.00 1.00 5.44 7.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 7,930.00 1.00 2.05 0.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7,930.00 1.00 2.05 0.30 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 1,222.00 7.00 9.06 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,222.00 7.00 9.06 6.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,167.00 1.66 2.84 2.13 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 104 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00002 Erosion Log Type 1 (12 In) Lin Foot =============================================== STA0142-066 SH 14 New Raymer West 01/09/20 100.00 5.00 5.63 6.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 800.00 5.00 9.00 9.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 10,041.00 6.00 6.60 5.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 1,913.00 6.00 6.07 6.50 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STA006A-067 SH 6 Merino to Atwood 01/16/20 300.00 5.00 10.36 11.75 STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 200.00 6.00 5.00 4.75 PWQM240-172 El Paso County, north Colorad 01/23/20 3,697.00 6.00 5.50 6.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 100.00 6.00 13.50 5.00 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 15,510.00 7.00 5.50 5.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 800.00 7.00 5.50 5.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 2,500.00 5.00 4.80 6.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 1,200.00 8.00 6.54 6.75 STR0101-027 SH 10 Overlay La Junta West 02/27/20 2,000.00 5.00 4.61 5.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 2,742.00 5.00 6.96 4.50 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 200.00 5.00 7.50 5.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 1,025.00 5.00 4.79 4.13 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 450.00 6.00 4.83 5.25 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 560.00 6.00 4.50 4.50 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 4,000.00 4.50 4.46 3.65 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 2,150.00 7.00 6.95 5.50 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 57,920.00 5.00 5.39 4.30 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1,760.00 5.00 5.48 5.25 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 510.00 5.50 6.40 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 110,478.00 5.50 5.48 4.74 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 200.00 5.00 6.21 4.93 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 1,000.00 5.00 5.98 6.85 IM0761-226 I76/SH52 Interchange 04/02/20 11,860.00 6.00 4.95 3.91 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 3,380.00 4.50 4.72 4.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 500.00 10.00 10.24 17.50 NHPP1601-077 US 160 MP 29.750 - MP 34.891 04/09/20 200.00 5.00 8.12 5.00 SFTY2254-091 225 Ramp Improvements 04/09/20 3,903.00 5.00 5.00 4.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 15,980.00 5.50 4.94 3.72 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 80.00 6.00 10.23 7.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 86.00 10.00 8.75 11.75 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 1,310.00 6.00 6.00 5.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 1,634.00 5.00 4.57 4.25 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 1,655.00 8.00 7.12 6.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 3,500.00 6.00 4.84 4.75 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 14,600.00 7.00 7.13 7.47 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 105 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00002 Erosion Log Type 1 (12 In) Lin Foot =============================================== NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 27,340.00 4.30 4.32 4.32 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 5,130.00 5.50 5.56 5.25 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 1,000.00 5.00 4.00 2.50 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 80.00 5.00 10.33 7.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 250.00 8.00 7.00 5.01 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 93,688.00 5.47 5.32 4.83 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 600.00 5.00 6.93 7.00 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 1,700.00 5.00 5.81 4.90 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 1,180.00 5.00 4.52 3.68 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 36.00 8.00 5.13 4.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 120.00 8.00 4.88 4.50 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 1,555.00 4.75 5.00 6.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 80.00 6.00 8.00 7.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 5,150.00 3.45 3.45 3.45 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 750.00 7.00 5.03 4.00 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 400.00 10.00 6.65 12.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 17,100.00 5.00 5.20 5.65 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 100.00 6.00 16.13 4.40 CR400-374 FY 20 Culvert Prioritization 09/17/20 1,500.00 6.00 4.65 4.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 23,085.00 4.05 4.32 4.32 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 53,356.00 4.54 5.08 4.79 MPC040-061 R2 FY 21 Sign Replacement 10/01/20 250.00 5.96 6.00 2.00 MTCE0253-271 FY20 I-25 SIGN REPL PHASE 1 10/08/20 250.00 5.00 6.47 5.00 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 490.00 5.00 10.02 3.65 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 7,300.00 6.00 7.47 5.31 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 1,000.00 8.00 5.03 4.90 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 17,000.00 4.00 5.49 4.50 NHPP0702-407 PR I-70 Glenwood Springs Griz 11/03/20 200.00 7.00 11.34 8.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 1,750.00 6.00 4.95 4.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 500.00 10.00 5.31 4.60 C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 200.00 7.00 7.58 6.00 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 1,000.00 5.00 6.58 7.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 100.00 8.00 7.41 6.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 700.00 6.00 5.21 5.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 200.00 7.00 6.74 4.75 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 480.00 8.00 5.80 5.31 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 639.00 5.00 6.75 8.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 50.00 5.30 5.30 5.30 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 106 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00002 Erosion Log Type 1 (12 In) Lin Foot =============================================== NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 13,000.00 4.00 4.34 4.20 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 118,905.00 4.69 5.02 5.02 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 164,014.00 4.70 5.26 4.92 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 421,536.00 5.06 5.35 4.84 =============== 208-00004 Silt Berm Lin Foot =============================================== FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 150.00 19.82 19.82 19.82 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 150.00 19.82 19.82 19.82 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 150.00 19.82 19.82 19.82 =============== 208-00007 Erosion Log Type 2 (8 In) Lin Foot =============================================== NH050A-035 US 50A Pueblo Regional Pond 05/28/20 16,600.00 6.20 4.48 3.70 NH050A-037 US 50A Pueblo Regional Pond -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16,600.00 6.20 4.48 3.70 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 3,440.00 4.69 4.95 3.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,440.00 4.69 4.95 3.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20,040.00 5.94 4.56 3.67 =============== 208-00008 Erosion Log Type 2 (12 In) Lin Foot =============================================== NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 350.00 10.00 8.35 10.00 STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 950.00 5.00 8.00 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,300.00 6.35 8.18 8.54 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 116.00 8.00 7.00 7.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 107 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00008 Erosion Log Type 2 (12 In) Lin Foot =============================================== STR184B-006 CULVERTS SH 184 08/06/20 625.00 7.00 7.75 7.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 741.00 7.16 7.63 7.63 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,041.00 6.64 8.03 8.21 =============== 208-00009 Erosion Log Type 2 (18 In) Lin Foot =============================================== STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 280.00 12.00 14.00 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 280.00 12.00 14.00 14.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 280.00 12.00 14.00 14.00 =============== 208-00011 Erosion Bales (Weed Free) Each =================================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 160.00 26.00 33.14 31.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 160.00 26.00 33.14 31.00 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 24.00 25.00 24.50 25.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 245.00 25.00 22.88 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 269.00 25.00 23.02 25.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 50.00 30.53 30.53 30.53 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 50.00 30.53 30.53 30.53 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 479.00 25.91 30.16 27.58 =============== 208-00012 Erosion Log Type 1 (9 In) Lin Foot =============================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 200.00 7.00 8.31 12.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 3,165.00 5.00 4.72 4.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,365.00 5.12 4.85 4.95 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 108 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00012 Erosion Log Type 1 (9 In) Lin Foot =============================================== STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 400.00 6.50 4.17 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 400.00 6.50 4.17 4.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 2,980.00 4.00 8.50 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,980.00 4.00 8.50 7.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,745.00 4.71 5.74 5.80 =============== 208-00013 Erosion Log Type 1 (20 In) Lin Foot =============================================== STR2871-038 US 287 Passing Lanes Springfi 03/05/20 2,000.00 10.00 6.46 7.28 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,000.00 10.00 6.46 7.28 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1,840.00 7.00 8.82 7.92 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 500.00 7.00 10.70 10.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,340.00 7.00 8.88 8.51 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 3,000.00 10.00 7.00 6.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,000.00 10.00 7.00 6.75 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 110.00 6.91 6.91 6.91 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 1,000.00 7.00 7.54 6.35 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1,000.00 6.65 7.12 7.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,110.00 6.83 7.47 6.74 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,450.00 8.55 7.67 7.30 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 109 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00020 Silt Fence Lin Foot =============================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 100.00 2.00 8.63 7.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 100.00 3.25 3.00 3.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 4,591.00 1.50 2.71 1.50 PWQM240-172 El Paso County, north Colorad 01/23/20 232.00 4.00 2.00 2.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 13,472.00 2.00 2.10 2.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 1,560.00 3.25 2.47 3.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 1,000.00 2.00 1.94 1.38 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 710.00 4.00 2.15 2.15 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 18,259.00 3.00 2.23 1.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 40,024.00 2.50 2.23 1.71 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 200.00 2.00 2.69 2.08 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 5,500.00 2.25 2.05 1.10 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 390.00 1.00 1.47 1.47 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 2,300.00 2.00 2.29 1.40 NH050A-037 US 50A Pueblo Regional Pond -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8,390.00 2.12 2.12 1.22 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 358.00 3.00 2.80 3.00 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 1,204.00 2.00 3.00 3.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 1,625.00 2.00 3.25 4.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 150.00 5.00 2.85 3.55 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 4,400.00 3.23 2.07 1.50 STM094A-038 SH94 WB PASSING LANE 09/01/20 2,130.00 1.20 1.20 1.20 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 3,320.00 3.00 2.95 5.05 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1,440.00 1.15 1.47 1.47 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 14,627.00 2.45 2.42 2.72 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 5,595.00 3.00 6.64 2.44 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 500.00 4.00 3.06 5.00 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 1,000.00 1.50 1.80 1.81 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 200.00 4.00 2.92 2.44 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 200.00 1.07 1.07 1.07 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 110 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00020 Silt Fence Lin Foot =============================================== NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 29,555.00 1.03 1.10 1.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 37,050.00 1.40 3.02 1.38 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 100,091.00 2.05 2.34 1.69 =============== 208-00021 Silt Fence (Reinf) Lin Foot =============================================== NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 1,500.00 5.00 3.95 2.89 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,500.00 5.00 3.95 2.89 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 208.00 3.00 8.00 10.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 930.00 3.00 2.94 2.94 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,138.00 3.00 4.50 4.23 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1,400.00 3.00 4.98 3.50 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 300.00 5.00 5.63 7.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,700.00 3.35 5.08 4.26 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 8,200.00 3.14 3.14 3.14 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 500.00 3.08 3.30 3.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8,700.00 3.13 3.14 3.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13,038.00 3.36 4.23 3.36 =============== 208-00023 Erosion Log (Type 3)(12 In) Lin Foot =============================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 1,350.00 6.00 8.08 6.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 1,719.00 6.50 7.06 8.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,069.00 6.28 7.35 7.12 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 111 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00023 Erosion Log (Type 3)(12 In) Lin Foot =============================================== IM025A-048 Northbound I-25 bridge at Exi 05/28/20 60.00 7.00 15.30 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 60.00 7.00 15.30 18.00 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 1,500.00 6.00 5.92 6.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,500.00 6.00 5.92 6.70 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,629.00 6.20 7.09 7.13 =============== 208-00024 Erosion Log (Type 3)(20 In) Lin Foot =============================================== BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 930.00 10.00 9.54 5.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 930.00 10.00 9.54 5.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 930.00 10.00 9.54 5.25 =============== 208-00025 Plastic Sheeting Sq Yard ================================================ FSA2873-194 US 287 Longmont Intersection 02/13/20 1,200.00 10.00 3.25 2.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,200.00 10.00 3.25 2.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,200.00 10.00 3.25 2.50 =============== 208-00033 Sediment Trap Each =================================================== NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 1.00 2000.00 3875.27 5250.53 PWQM240-172 El Paso County, north Colorad 01/23/20 1.00 3000.00 7255.00 8110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 2500.00 5565.13 6680.27 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1.00 10000.00 10898.88 10898.88 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 10000.00 10898.88 10898.88 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 112 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00033 Sediment Trap Each =================================================== FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 4.00 4095.00 4095.00 4095.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 4095.00 4095.00 4095.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 4482.86 5504.38 5805.63 =============== 208-00035 Aggregate Bag Lin Foot =============================================== STA0142-066 SH 14 New Raymer West 01/09/20 800.00 23.00 7.50 6.00 FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 25.00 12.00 18.51 22.00 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 120.00 10.00 12.32 11.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 120.00 10.00 13.00 13.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 3,040.00 5.00 7.48 6.50 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 120.00 6.50 11.14 8.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STA006A-067 SH 6 Merino to Atwood 01/16/20 500.00 23.00 9.85 8.50 STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 200.00 8.00 8.50 11.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 1,500.00 6.00 6.97 6.93 PWQM240-172 El Paso County, north Colorad 01/23/20 1,080.00 12.00 6.50 5.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 100.00 12.00 15.00 12.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 65.00 12.00 30.75 16.50 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 500.00 8.00 8.35 7.20 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 700.00 8.00 9.00 8.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 400.00 10.00 9.89 6.60 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 8.00 8.00 11.84 12.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 100.00 10.00 19.95 11.50 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 200.00 10.00 10.50 11.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 210.00 10.00 16.96 34.25 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 100.00 10.00 9.60 8.00 NHPP0502-082 US 50 MONTROSE RE CHIP SEAL 03/05/20 1,000.00 10.00 7.94 5.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 212.00 10.00 8.45 7.50 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 25,200.00 8.00 6.63 5.80 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 425.00 10.00 6.90 6.75 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 100.00 12.00 9.40 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 36,825.00 8.50 6.90 6.33 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 200.00 9.00 11.99 12.77 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 500.00 10.00 10.80 8.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 113 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00035 Aggregate Bag Lin Foot =============================================== IM0761-226 I76/SH52 Interchange 04/02/20 384.00 10.00 9.86 6.36 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 100.00 9.00 18.57 20.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 500.00 15.00 12.81 17.50 SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 1,000.00 12.00 5.00 5.00 C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 200.00 6.00 12.60 14.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 1,220.00 10.00 13.00 12.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 40.00 10.00 15.00 12.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 145.00 10.00 12.67 15.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 1,500.00 8.00 7.33 8.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 200.00 20.00 10.73 10.24 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 100.00 5.00 14.67 24.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 100.00 11.00 10.86 10.86 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 635.00 12.00 7.82 0.10 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 800.00 10.00 8.58 8.00 NH050A-037 US 50A Pueblo Regional Pond ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 220.00 14.00 9.75 7.50 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 120.00 8.00 8.83 7.50 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 60.00 10.00 11.96 11.78 NHPPR100-251 SH 2/ Vasquez 06/25/20 200.00 10.00 20.28 32.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8,224.00 10.48 9.30 9.59 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 600.00 6.00 9.88 10.00 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 200.00 8.00 11.87 9.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 335.00 8.00 7.00 7.00 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 1,920.00 6.00 6.95 6.50 FSAC010-124 US 40, US 287, SH 88 08/06/20 175.00 12.00 12.33 14.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 1,530.00 7.00 11.14 6.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 350.00 5.24 5.24 5.24 MTCE0702-386 Grand Junction 09/03/20 100.00 20.00 7.00 11.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 40.00 12.00 11.51 12.00 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 400.00 15.00 12.95 12.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 200.00 10.00 8.01 8.50 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 125.00 14.00 12.53 11.70 SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 1,500.00 12.00 6.25 7.50 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 60.00 2.00 25.46 9.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 200.00 6.40 8.69 8.69 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7,735.00 8.49 9.37 7.65 MTCE0253-271 FY20 I-25 SIGN REPL PHASE 1 10/08/20 50.00 10.00 11.67 5.00 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 9,300.00 8.00 9.27 5.31 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 114 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00035 Aggregate Bag Lin Foot =============================================== NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 1,000.00 15.00 6.58 5.25 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 1,200.00 8.00 7.11 8.75 NHPP0702-407 PR I-70 Glenwood Springs Griz 11/03/20 500.00 12.00 9.80 10.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 2,865.00 10.00 6.73 6.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 500.00 15.00 6.09 5.22 C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 750.00 12.00 5.62 5.50 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 500.00 7.00 9.00 9.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 100.00 8.00 10.63 9.00 FSA1211-098 SH 121 & 1ST AVE 11/19/20 150.00 8.00 9.00 10.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 3,120.00 6.00 10.25 8.50 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 150.00 8.50 10.09 10.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 100.00 10.00 7.78 5.25 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 200.00 8.00 7.03 7.97 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 200.00 12.00 10.01 8.29 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 108.00 8.00 13.50 11.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1,000.00 5.23 5.23 5.23 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 200.00 7.00 9.23 5.25 STA141A-051 This will be a chipseal proje 12/17/20 1,000.00 8.00 9.54 15.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 2,450.00 4.07 4.35 4.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 25,443.00 8.12 8.31 6.53 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 78,227.00 8.58 7.63 6.87 =============== 208-00036 Aggregate Bag (Special) Lin Foot =============================================== FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 200.00 6.16 6.16 6.16 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 200.00 6.16 6.16 6.16 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 200.00 6.16 6.16 6.16 =============== 208-00041 Rock Check Dam Each =================================================== PWQM240-172 El Paso County, north Colorad 01/23/20 13.00 700.00 2541.00 2482.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 13.00 700.00 2541.00 2482.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 71.00 700.00 992.77 440.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 50.00 540.00 609.05 609.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 121.00 633.88 961.73 509.86 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 115 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00041 Rock Check Dam Each =================================================== NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 2.00 1000.00 1171.06 1225.23 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 4.00 500.00 800.00 500.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 2.00 897.79 1521.76 530.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 724.45 1244.47 688.81 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 4.00 777.00 777.00 777.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 101.00 101.88 584.50 584.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 105.00 127.60 591.83 591.83 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 247.00 425.07 977.53 654.30 =============== 208-00045 Conc Washout Str Each =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 1.00 1500.00 4000.00 4000.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 6.00 1500.00 2204.98 2384.00 PWQM240-172 El Paso County, north Colorad 01/23/20 14.00 3000.00 898.50 817.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 2.00 2000.00 2824.20 2721.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 1.00 3000.00 2562.97 2500.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 2.00 1970.00 2360.65 2500.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 2.00 2000.00 1280.51 2340.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 2.00 1500.00 1632.32 698.62 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 2.00 2500.00 4619.03 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 32.00 2357.50 2204.63 1680.04 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 1.00 800.00 1358.80 541.43 IM0761-226 I76/SH52 Interchange 04/02/20 3.00 1500.00 5367.23 2915.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 4.00 1500.00 2562.50 1125.00 SFTY2254-091 225 Ramp Improvements 04/09/20 3.00 1500.00 3282.50 1665.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 6.00 2500.00 2732.18 550.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 3.00 2040.00 1290.00 685.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 3.00 2597.00 1612.52 1612.52 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 8.00 1500.00 833.50 500.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 116 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00045 Conc Washout Str Each =================================================== NH050A-037 US 50A Pueblo Regional Pond SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 1.00 2000.00 1320.60 223.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 32.00 1834.72 2182.77 1037.41 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 1.00 1900.00 2256.39 1488.32 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 3.00 2500.00 925.00 750.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 4.00 2000.00 865.00 750.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 4.00 1791.35 1435.73 1000.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1.00 2500.00 2136.97 650.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 2.00 2000.00 2844.48 3230.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 1.00 2200.00 2902.47 4000.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 2.00 800.00 1860.67 200.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 8.00 2666.34 1846.08 1846.08 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 26.00 2161.39 1818.42 1423.73 MPC040-061 R2 FY 21 Sign Replacement 10/01/20 1.00 1591.35 1350.00 1200.00 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 5.00 2000.00 1393.75 2100.00 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 1.00 2500.00 1644.31 1600.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 7.00 2500.00 1285.00 575.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 15.00 1316.71 1297.76 1297.76 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 29.00 1770.41 1351.19 1268.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 119.00 2031.00 1997.67 1350.98 =============== 208-00046 Pre-fab Conc Washout Str (Type 1) Each =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 1.00 2500.00 2676.38 3200.00 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 2.00 640.00 1186.67 710.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 3.00 1810.00 1795.49 1180.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 1.00 2000.00 4125.27 5250.53 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 1.00 2500.00 9000.00 5000.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 2.00 2000.00 2898.35 2596.70 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 4.00 1750.00 535.05 400.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 2.00 1600.00 2025.00 2050.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 10.00 1500.00 808.33 600.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 2.00 2000.00 1750.00 500.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 117 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00046 Pre-fab Conc Washout Str (Type 1) Each =================================================== NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 1.00 2000.00 200.00 200.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1.00 1000.00 13146.67 10000.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 2.00 3000.00 2432.50 2885.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 2.00 2500.00 1348.00 1450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 34.00 1791.47 1577.75 1622.76 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 2.00 2000.00 1008.33 1200.00 SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 3.00 2500.00 1800.00 1800.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 2.00 2200.00 2685.30 3300.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1601-082 Hawkins Signal and Curb Ramps 04/30/20 3.00 1500.00 666.67 400.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 2.00 1600.00 3377.33 207.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 4.00 2000.00 611.67 685.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 34.00 500.00 259.75 91.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 2.00 8000.00 4963.60 4963.60 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 2.00 500.00 982.20 350.00 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 9.00 750.00 250.00 250.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 2.00 2200.00 595.00 725.00 NHPPR100-251 SH 2/ Vasquez 06/25/20 4.00 1500.00 1398.55 1256.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 69.00 1199.28 699.79 597.10 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 2.00 1600.00 1381.67 200.00 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 2.00 1613.00 2266.67 600.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 3.00 1625.00 1072.50 1145.00 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 1.00 1000.00 2632.60 1600.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 3.00 2000.00 1271.67 710.00 STR184B-006 CULVERTS SH 184 08/06/20 1.00 600.00 3000.00 3000.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 2.00 500.00 4478.57 2000.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 2.00 2000.00 3154.13 2370.63 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1.00 2500.00 2309.57 5000.00 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 1.00 1500.00 2173.60 3418.00 SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 3.00 2000.00 1250.00 500.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 8.00 4204.00 4593.26 4593.26 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 29.00 2328.72 2581.41 2316.22 MTCE0253-271 FY20 I-25 SIGN REPL PHASE 1 10/08/20 1.00 2000.00 2500.00 2500.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 118 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00046 Pre-fab Conc Washout Str (Type 1) Each =================================================== CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 6.00 2000.00 1082.20 800.00 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 1.00 3000.00 1245.00 235.00 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 4.00 3000.00 1327.67 478.00 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 4.00 1820.00 1365.67 250.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 3.00 2000.00 1571.67 165.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 1.00 1200.00 2035.50 1725.00 C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 1.00 2000.00 3311.22 2000.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 1.00 1500.00 1594.75 1254.00 FSA1211-098 SH 121 & 1ST AVE 11/19/20 1.00 2300.00 526.67 930.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 2.00 1900.00 2685.50 3121.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 1.00 2000.00 2331.64 5720.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 6.00 4800.87 4800.87 4800.87 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 2.00 2000.00 4046.67 3110.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 8.00 4204.00 4858.50 4858.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 42.00 2893.27 2105.41 2445.39 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 174.00 1912.13 1501.47 1530.17 =============== 208-00051 Storm Drain Inlet Protection (Type I) Lin Foot =============================================== BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 9.00 20.00 26.80 15.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC PWQM240-172 El Paso County, north Colorad 01/23/20 18.00 20.00 6.50 5.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 65.00 20.00 31.22 17.44 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 159.00 25.00 9.63 10.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 49.00 15.00 21.68 6.75 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 78.00 15.00 17.80 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 378.00 20.42 16.37 10.74 IM0761-226 I76/SH52 Interchange 04/02/20 197.00 18.00 12.45 6.68 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1,584.00 19.00 12.44 11.77 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 7.00 25.00 48.00 14.00 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 325.00 25.00 27.79 0.10 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 40.00 20.00 17.00 8.50 NH050A-037 US 50A Pueblo Regional Pond SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 160.00 35.00 11.84 10.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,313.00 20.90 14.02 9.54 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 100.00 20.00 15.28 28.05 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 119 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00051 Storm Drain Inlet Protection (Type I) Lin Foot =============================================== SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 155.00 10.00 11.50 15.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 60.00 12.50 23.79 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 315.00 13.65 15.61 18.38 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 60.00 25.00 7.98 9.75 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 430.00 4.38 4.69 4.69 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 490.00 6.90 5.66 5.31 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,496.00 18.23 13.99 9.87 =============== 208-00052 Storm Drain Inlet Protection (Type II) Lin Foot =============================================== C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 10.00 70.00 25.00 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 70.00 25.00 35.00 IM0761-226 I76/SH52 Interchange 04/02/20 10.00 330.00 96.57 117.66 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 10.00 50.00 67.33 39.00 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 325.00 65.00 48.34 0.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 345.00 72.25 50.63 4.64 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 100.00 20.00 88.43 69.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 100.00 20.00 88.43 69.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 455.00 60.71 60.08 19.45 =============== 208-00053 Storm Drain Inlet Protect (Ty I)(84 In) Each =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 15.00 208.00 200.00 200.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 3.00 200.00 425.00 200.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 1.00 200.00 293.17 124.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 120 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00053 Storm Drain Inlet Protect (Ty I)(84 In) Each =================================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 8.00 180.00 325.55 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 27.00 198.52 309.28 179.41 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 2.00 55.00 231.19 72.00 NH050A-037 US 50A Pueblo Regional Pond FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 1.00 200.00 171.67 190.00 NHPPR100-251 SH 2/ Vasquez 06/25/20 1.00 200.00 1274.15 2355.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 127.50 322.01 672.33 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 3.00 225.00 177.93 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 225.00 177.93 200.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 4.00 100.00 259.00 314.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 4.00 250.00 180.00 315.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8.00 175.00 232.67 314.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 42.00 189.17 281.70 253.55 =============== 208-00054 Storm Drain Inlet Protection (Type II) Each =================================================== NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 69.00 250.00 387.50 300.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 5.00 200.00 267.00 200.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 6.00 300.00 286.67 360.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 6.00 100.00 546.67 210.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 15.00 50.00 369.55 345.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 34.00 250.00 257.00 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 135.00 221.48 323.95 287.37 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 6.00 250.00 276.67 295.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 121 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00054 Storm Drain Inlet Protection (Type II) Each =================================================== FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 3.00 250.00 200.67 177.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 9.00 250.00 251.33 255.67 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 8.00 290.00 228.00 216.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 5.00 300.00 344.67 444.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 10.00 300.00 249.90 141.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 23.00 296.52 261.67 232.96 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 2.00 150.00 321.00 285.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 3.00 290.00 230.00 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 234.00 282.00 294.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 172.00 233.37 308.98 278.63 =============== 208-00055 Rigid Inlet Prot Device Each =================================================== STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 220.00 25.00 79.66 80.06 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 220.00 25.00 79.66 80.06 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 3.00 50.00 367.00 177.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 50.00 367.00 177.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 223.00 25.34 85.41 81.36 =============== 208-00056 Storm Drain Inlet Protection (Type III) Each =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 1.00 400.00 65.00 65.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 3.00 500.00 650.00 300.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 9.00 80.00 354.03 290.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 13.00 201.54 413.50 275.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 122 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00056 Storm Drain Inlet Protection (Type III) Each =================================================== IM0761-226 I76/SH52 Interchange 04/02/20 10.00 350.00 307.02 295.74 SFTY2254-091 225 Ramp Improvements 04/09/20 8.00 300.00 307.50 265.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 6.00 350.00 352.83 352.83 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 5.00 250.00 254.33 200.00 NHPPR100-251 SH 2/ Vasquez 06/25/20 7.00 350.00 405.63 43.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 36.00 325.00 314.23 236.03 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 10.00 300.00 225.02 141.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 75.00 200.19 352.83 352.83 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 85.00 211.93 296.03 327.91 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 15.00 275.00 179.33 215.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 15.00 275.00 179.33 215.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 149.00 244.69 295.68 289.73 =============== 208-00057 Storm Drain Inlet Protect (Ty I)(144 In) Each =================================================== FSA2873-194 US 287 Longmont Intersection 02/13/20 1.00 250.00 384.83 211.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 3.00 300.00 409.34 240.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 287.50 404.44 232.75 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 1.00 300.00 223.33 268.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 300.00 223.33 268.00 FSA1211-098 SH 121 & 1ST AVE 11/19/20 2.00 300.00 300.00 350.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 123 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00057 Storm Drain Inlet Protect (Ty I)(144 In) Each =================================================== NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 4.00 300.00 230.00 385.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 300.00 260.00 373.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 295.45 349.85 312.64 =============== 208-00058 Storm Drain Inlet Protect (Ty I)(204 In) Each =================================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 2.00 430.00 467.67 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 430.00 467.67 300.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 19.00 489.69 523.97 523.97 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 19.00 489.69 523.97 523.97 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21.00 484.01 498.23 502.64 =============== 208-00060 Temporary Slope Drain Lin Foot =============================================== FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 640.00 11.78 11.78 11.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 640.00 11.78 11.78 11.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 640.00 11.78 11.78 11.78 =============== 208-00070 Vehicle Tracking Pad Each =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 2.00 2500.00 3378.95 2600.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 1.00 3000.00 2500.00 2500.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 2.00 2000.00 4019.81 3476.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 2.00 2000.00 2337.69 3675.37 PWQM240-172 El Paso County, north Colorad 01/23/20 14.00 3000.00 3547.00 5294.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 1.00 3000.00 3750.00 2500.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 3.00 2000.00 2840.00 2500.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 2.00 2600.00 1899.97 1200.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 4.00 1500.00 2213.75 3641.26 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 3.00 2500.00 2425.27 1294.25 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1.00 1000.00 6573.33 12000.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 124 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00070 Vehicle Tracking Pad Each =================================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 4.00 2600.00 4703.46 2100.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1.00 3000.00 2415.00 3025.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 40.00 2502.50 3403.31 3759.79 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 1.00 3500.00 2533.11 3954.46 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 4.00 2000.00 2812.50 3125.00 SFTY2254-091 225 Ramp Improvements 04/09/20 2.00 2500.00 4387.50 3775.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 6.00 3000.00 2933.94 2145.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 2.00 2000.00 3438.33 3010.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 4.00 4000.00 3468.06 3468.06 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 5.00 2500.00 2227.25 1000.00 NH050A-037 US 50A Pueblo Regional Pond -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 24.00 2791.67 2761.69 2573.61 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 2.00 2600.00 2827.81 1377.85 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 2.00 3000.00 2700.00 1500.00 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 2.00 3000.00 3530.00 3530.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 4.00 2886.50 2832.02 1500.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 3.00 2770.34 2770.34 2770.34 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1.00 3000.00 3193.05 3500.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 1.00 2500.00 4309.70 3907.70 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 12.00 3394.84 3761.18 3761.18 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 27.00 3085.00 3144.09 2950.69 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 1.00 2000.00 2865.75 1938.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 3.00 2600.00 4000.00 3325.00 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 4.00 2300.00 2434.43 3504.59 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 1.00 2500.00 5596.67 4350.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 30.00 3394.89 3189.88 3189.88 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 39.00 3162.74 3344.01 3230.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 130.00 2874.94 3155.44 3213.88 =============== 208-00071 Maint Aggregate (Veh Track Pad) Cubic Yard ============================================= NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 10.00 50.00 143.33 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 50.00 143.33 200.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 125 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00071 Maint Aggregate (Veh Track Pad) Cubic Yard ============================================= NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 50.00 100.00 64.16 124.57 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 50.00 75.00 114.68 68.26 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 150.00 100.00 111.69 111.69 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 250.00 95.00 103.21 105.58 STM094A-038 SH94 WB PASSING LANE 09/01/20 100.00 56.69 56.69 56.69 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 500.00 80.00 59.49 75.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 450.00 85.45 127.52 127.52 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,050.00 80.12 66.98 95.76 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 74.00 75.00 82.97 85.81 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 2,250.00 85.45 104.66 104.66 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,324.00 85.12 102.71 104.06 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,634.00 84.26 82.97 102.03 =============== 208-00075 Pre-fab Vehicle Track Pad Each =================================================== STA0142-066 SH 14 New Raymer West 01/09/20 1.00 4750.00 2218.25 2800.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 1.00 1800.00 3750.00 3750.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 2.00 3000.00 4647.95 5740.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STA006A-067 SH 6 Merino to Atwood 01/16/20 1.00 2500.00 2750.08 2700.00 STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 9.00 3500.00 900.00 900.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 1.00 2000.00 2650.00 2800.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 2.00 1000.00 5199.97 1000.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 2.00 2000.00 3075.00 2500.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 2.00 5000.00 2633.27 1000.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 4.00 5000.00 8612.75 11700.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 2.00 1500.00 5258.00 2750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 27.00 3242.59 4065.00 3441.85 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 126 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00075 Pre-fab Vehicle Track Pad Each =================================================== IM0761-226 I76/SH52 Interchange 04/02/20 3.00 4000.00 8189.67 1959.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 2.00 2500.00 5133.33 250.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 2.00 1200.00 4833.33 3600.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 2.00 2000.00 7615.63 4200.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 2.00 3000.00 3197.51 3900.00 IM025A-048 Northbound I-25 bridge at Exi 05/28/20 1.00 5475.00 5816.33 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12.00 2906.25 6123.39 2898.08 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 4.00 2121.00 1766.67 1600.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 5.00 3400.00 2207.50 2615.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 4.00 2100.00 6087.86 2830.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 2.00 33060.28 33060.28 33060.28 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 3.00 5000.00 4370.00 4160.00 CR400-374 FY 20 Culvert Prioritization 09/17/20 3.00 3000.00 3000.50 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 21.00 5904.98 4811.24 5352.17 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 6.00 2200.00 2439.00 1450.00 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 5.00 4000.00 3672.07 4316.20 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 2.00 10000.00 9813.33 16740.00 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 3.00 4000.00 5906.83 3333.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 3.00 5000.00 8516.67 5000.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 11.00 2656.15 2656.15 2656.15 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 5.00 15850.96 20042.59 20042.59 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 35.00 5390.64 5314.20 6234.02 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 95.00 4580.02 5079.79 4824.14 =============== 208-00082 Construction Mat Sq Foot ================================================ NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 175.00 100.00 25.00 25.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 200.00 17.00 28.49 24.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 375.00 55.73 28.10 24.55 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 127 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00082 Construction Mat Sq Foot ================================================ CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 6,520.00 3.00 10.58 17.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6,520.00 3.00 10.58 17.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,895.00 5.87 11.39 17.51 =============== 208-00090 Erosion Control (Curb Ramp) Each =================================================== STRR300-249 Grand and Jackson Counties AD 03/05/20 148.00 300.00 361.00 290.00 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 36.00 300.00 172.57 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 184.00 300.00 314.85 272.39 STMM086-083 ADA PUEBLO METRO 07/09/20 198.00 250.00 675.00 650.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 125.00 300.00 216.67 300.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 203.00 500.00 423.25 295.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 123.00 400.00 379.09 295.43 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 649.00 366.26 421.35 404.35 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 147.00 650.00 533.33 350.00 CR100-342 US-6 at Garrison 12/17/20 84.00 350.00 505.00 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 231.00 540.91 518.22 368.18 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,064.00 392.72 428.34 373.68 =============== 208-00103 Removal and Disposal of Sediment (Labor) Hour =================================================== STA0142-066 SH 14 New Raymer West 01/09/20 50.00 45.00 52.75 40.00 FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 16.00 65.00 83.03 60.00 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 8.00 75.00 73.33 70.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 20.00 54.00 75.00 75.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 204.50 50.00 82.36 44.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 128 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00103 Removal and Disposal of Sediment (Labor) Hour =================================================== BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 50.00 55.00 53.41 35.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STA006A-067 SH 6 Merino to Atwood 01/16/20 50.00 45.00 91.00 126.00 STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 40.00 40.00 36.75 38.50 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 40.00 50.00 56.26 52.51 PWQM240-172 El Paso County, north Colorad 01/23/20 16.00 75.00 125.50 219.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 30.00 65.00 62.50 60.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 24.00 70.00 224.49 203.97 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 20.00 50.00 60.60 50.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 40.00 50.00 53.00 46.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 70.00 60.00 88.83 50.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 50.00 52.00 58.50 65.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 16.00 60.00 120.64 60.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 50.00 60.00 40.00 60.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 40.00 50.00 106.23 170.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 80.00 60.00 51.00 50.00 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 30.00 40.00 36.00 37.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 20.00 55.00 54.00 54.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 50.00 50.00 59.25 58.50 NHPP0502-082 US 50 MONTROSE RE CHIP SEAL 03/05/20 20.00 50.00 43.50 35.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 40.00 55.00 57.24 62.71 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 100.00 60.00 51.12 51.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 108.00 60.00 46.75 43.70 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 20.00 65.00 51.00 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,302.50 54.48 67.45 60.96 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 80.00 60.00 60.66 62.37 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 40.00 50.00 30.65 32.50 IM0761-226 I76/SH52 Interchange 04/02/20 60.00 55.00 52.38 53.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 16.00 55.00 32.67 20.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 40.00 70.00 48.00 35.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 60.00 40.00 70.00 100.00 NHPP1601-077 US 160 MP 29.750 - MP 34.891 04/09/20 8.00 50.00 54.67 50.00 SFTY2254-091 225 Ramp Improvements 04/09/20 48.00 65.00 53.50 45.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 300.00 60.00 78.91 110.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 30.00 60.00 73.08 58.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 30.00 50.00 66.67 78.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 10.00 60.00 88.33 96.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 24.00 50.00 47.00 35.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 8.00 70.00 56.67 42.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 216.00 50.00 44.39 25.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 100.00 60.00 54.25 19.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 15.00 50.00 41.67 35.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 129 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00103 Removal and Disposal of Sediment (Labor) Hour =================================================== NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 40.00 60.00 50.99 50.99 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 40.00 70.00 85.96 1.00 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 200.00 50.00 51.35 45.00 NH050A-037 US 50A Pueblo Regional Pond ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 50.00 60.00 42.50 10.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 8.00 100.00 71.67 60.00 NHPPR100-251 SH 2/ Vasquez 06/25/20 10.00 75.00 87.68 113.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,433.00 56.29 59.27 55.82 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 16.00 55.00 160.00 50.00 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 30.00 50.00 48.38 20.00 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 30.00 60.00 56.23 63.45 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 80.00 60.00 90.00 80.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 50.00 75.00 47.50 45.00 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 10.00 100.00 45.00 45.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 50.00 60.00 50.00 65.00 STR184B-006 CULVERTS SH 184 08/06/20 100.00 60.00 55.00 55.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 60.00 70.00 53.71 50.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 80.00 59.45 52.44 52.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 20.00 43.73 43.73 43.73 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 10.00 70.00 112.79 50.00 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 5.00 60.00 77.28 55.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 100.00 50.00 66.80 68.30 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 40.00 50.00 82.55 40.25 CR400-374 FY 20 Culvert Prioritization 09/17/20 24.00 56.00 70.25 35.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 40.00 46.68 53.54 53.54 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 745.00 58.75 64.20 55.55 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 30.00 55.00 49.93 81.35 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 45.00 60.00 70.29 65.87 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 40.00 70.00 48.50 40.50 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 80.00 60.00 77.73 0.10 NHPP0702-407 PR I-70 Glenwood Springs Griz 11/03/20 5.00 60.00 100.20 65.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 20.00 55.00 53.23 48.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 40.00 70.00 54.93 46.25 C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 40.00 60.00 75.13 49.00 ITSITSB-002 ITS CV ROADSIDE UNITS 11/12/20 20.00 60.00 44.67 36.00 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 4.00 50.00 169.75 79.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 10.00 50.00 66.50 75.00 FSA1211-098 SH 121 & 1ST AVE 11/19/20 3.00 65.00 76.00 75.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 130 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00103 Removal and Disposal of Sediment (Labor) Hour =================================================== NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 50.00 60.00 67.00 34.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 30.00 45.00 54.15 60.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 60.00 75.00 68.94 54.00 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 20.00 55.00 64.74 36.62 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 40.00 75.00 102.97 90.31 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 84.00 60.00 90.00 95.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 400.00 53.38 53.38 53.38 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 400.00 40.00 59.33 44.80 STA141A-051 This will be a chipseal proje 12/17/20 20.00 50.00 85.40 165.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 200.00 46.68 52.29 52.29 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,641.00 52.60 63.81 52.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,121.50 55.01 62.74 56.04 =============== 208-00105 Removal and Disposal of Sediment (Equip) Hour =================================================== STA0142-066 SH 14 New Raymer West 01/09/20 50.00 85.00 95.75 80.00 FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 16.00 100.00 235.64 250.00 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 8.00 150.00 132.33 92.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 205.00 100.00 164.67 185.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 100.00 110.00 113.50 105.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STA006A-067 SH 6 Merino to Atwood 01/16/20 50.00 85.00 153.51 195.00 STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 40.00 150.00 88.65 82.30 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 40.00 150.00 96.88 78.76 PWQM240-172 El Paso County, north Colorad 01/23/20 16.00 135.00 392.00 454.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 30.00 110.00 130.00 100.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 12.00 120.00 424.42 358.84 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 20.00 120.00 134.40 85.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 8.00 150.00 107.50 85.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 20.00 130.00 143.00 150.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 50.00 105.00 99.00 120.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 16.00 120.00 222.55 100.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 50.00 150.00 72.50 125.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 40.00 100.00 211.27 340.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 80.00 100.00 111.67 100.01 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 30.00 150.00 90.00 100.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 20.00 150.00 137.00 137.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 50.00 150.00 152.75 175.50 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 40.00 120.00 123.20 117.43 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 100.00 150.00 103.33 130.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 20.00 100.00 130.80 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,111.00 118.24 134.41 147.58 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 80.00 150.00 139.91 148.14 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 131 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00105 Removal and Disposal of Sediment (Equip) Hour =================================================== IM0761-226 I76/SH52 Interchange 04/02/20 60.00 110.00 111.97 212.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 12.00 100.00 96.00 20.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 40.00 150.00 100.01 78.80 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 30.00 100.00 175.00 100.00 SFTY2254-091 225 Ramp Improvements 04/09/20 48.00 150.00 112.50 105.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 150.00 130.00 161.29 275.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 30.00 120.00 131.02 125.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 30.00 125.00 169.67 169.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 10.00 100.00 99.67 56.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 24.00 125.00 109.38 65.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 24.00 125.00 159.67 125.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 20.00 115.00 111.91 90.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 100.00 120.00 101.50 50.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 40.00 130.00 204.98 204.98 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 40.00 120.00 124.17 1.00 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 200.00 50.00 123.81 75.00 NH050A-037 US 50A Pueblo Regional Pond ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 50.00 135.00 42.50 10.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 8.00 150.00 131.67 195.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 996.00 112.55 129.40 123.79 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 30.00 100.00 91.71 20.00 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 30.00 120.00 133.18 106.95 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 80.00 150.00 220.00 215.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 50.00 150.00 112.50 110.00 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 10.00 150.00 120.00 120.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 25.00 150.00 105.00 130.00 STR184B-006 CULVERTS SH 184 08/06/20 40.00 180.00 110.00 110.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 20.00 120.00 140.43 85.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 80.00 127.06 119.54 120.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 40.00 105.92 105.92 105.92 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 10.00 120.00 125.29 120.00 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 5.00 150.00 97.74 65.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 100.00 150.00 112.25 115.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 20.00 110.00 159.10 151.65 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 40.00 183.95 169.35 169.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 580.00 141.14 126.62 127.12 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 30.00 110.00 100.18 130.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 132 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00105 Removal and Disposal of Sediment (Equip) Hour =================================================== NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 45.00 110.00 138.95 166.84 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 20.00 135.00 135.67 147.00 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 80.00 110.00 123.85 0.10 NHPP0702-407 PR I-70 Glenwood Springs Griz 11/03/20 5.00 120.00 218.24 165.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 10.00 150.00 136.00 120.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 40.00 150.00 131.07 130.00 C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 20.00 120.00 141.45 87.00 ITSITSB-002 ITS CV ROADSIDE UNITS 11/12/20 20.00 150.00 52.33 36.00 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 4.00 150.00 208.25 138.00 FSA1211-098 SH 121 & 1ST AVE 11/19/20 4.00 140.00 63.67 28.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 10.00 105.00 150.00 40.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 30.00 110.00 105.50 130.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 60.00 150.00 142.06 42.00 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 20.00 120.00 161.74 154.39 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 40.00 125.00 164.81 191.25 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 84.00 100.00 85.00 120.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 50.00 167.37 167.37 167.37 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 40.00 140.00 120.42 109.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 200.00 183.95 167.63 167.63 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 812.00 140.79 129.46 121.43 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,499.00 125.65 130.23 131.35 =============== 208-00106 Sweeping (Sediment Removal) Hour =================================================== STA0142-066 SH 14 New Raymer West 01/09/20 20.00 135.00 155.75 121.00 FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 12.00 160.00 206.24 130.00 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 6.00 200.00 215.00 170.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 80.00 150.00 120.00 120.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 750.00 125.00 169.21 153.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 100.00 130.00 159.17 90.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STA006A-067 SH 6 Merino to Atwood 01/16/20 20.00 135.00 265.71 285.00 STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 40.00 125.00 165.00 220.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 40.00 150.00 211.27 262.53 PWQM240-172 El Paso County, north Colorad 01/23/20 24.00 175.00 176.50 93.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 30.00 150.00 225.00 250.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 24.00 175.00 365.88 181.76 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 20.00 150.00 99.48 75.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 40.00 150.00 176.60 148.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 144.00 140.00 148.50 127.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 270.00 140.00 223.83 138.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 20.00 155.00 191.00 200.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 20.00 125.00 176.74 150.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 10.00 180.00 110.00 200.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 133 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00106 Sweeping (Sediment Removal) Hour =================================================== NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 50.00 150.00 213.09 340.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 80.00 140.00 139.00 150.01 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 20.00 125.00 161.50 110.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 10.00 160.00 400.00 400.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 40.00 145.00 172.56 102.93 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 40.00 150.00 281.92 420.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 180.00 150.00 60.93 45.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 40.00 150.00 169.40 225.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,130.00 137.62 178.32 151.47 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 24.00 200.00 158.59 166.41 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 40.00 150.00 139.50 132.00 IM0761-226 I76/SH52 Interchange 04/02/20 60.00 155.00 177.14 159.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 30.00 110.00 123.67 20.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 40.00 180.00 182.94 213.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 30.00 155.00 125.00 100.00 SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 60.00 165.00 20.00 20.00 NHPP1601-077 US 160 MP 29.750 - MP 34.891 04/09/20 8.00 350.00 170.00 150.00 SFTY2254-091 225 Ramp Improvements 04/09/20 60.00 175.00 212.50 125.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 150.00 170.00 173.63 55.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 38.00 160.00 214.00 186.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 30.00 150.00 175.00 145.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 100.00 140.00 151.88 140.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 20.00 120.00 174.33 185.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 360.00 130.00 127.15 50.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 150.00 150.00 101.50 79.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 50.00 150.00 160.50 160.50 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 20.00 165.00 142.28 1.00 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 200.00 50.00 136.69 75.00 NH050A-037 US 50A Pueblo Regional Pond IM025A-048 Northbound I-25 bridge at Exi 05/28/20 60.00 170.00 147.90 120.00 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 50.00 185.00 40.00 5.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 6.00 200.00 195.00 195.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 40.00 150.00 161.82 104.10 NHPPR100-251 SH 2/ Vasquez 06/25/20 100.00 150.00 147.08 128.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,726.00 140.60 141.71 90.79 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 30.00 100.00 110.62 20.00 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 10.00 150.00 174.95 154.10 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 134 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00106 Sweeping (Sediment Removal) Hour =================================================== NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 10.00 200.00 300.00 300.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 50.00 150.00 147.50 185.00 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 10.00 150.00 162.60 225.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 24.00 200.00 193.33 275.00 STR184B-006 CULVERTS SH 184 08/06/20 30.00 115.00 110.00 110.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 10.00 95.00 202.57 85.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 80.00 154.85 140.69 120.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 30.00 262.15 262.15 262.15 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 20.00 200.00 149.86 150.00 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 5.00 60.00 136.80 85.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 50.00 100.00 127.51 170.00 SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 300.00 200.00 47.50 75.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 20.00 140.00 175.33 120.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 100.00 136.79 134.82 134.82 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 779.00 167.82 121.91 122.16 MTCE0253-271 FY20 I-25 SIGN REPL PHASE 1 10/08/20 20.00 150.00 104.33 50.00 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 30.00 140.00 129.40 118.00 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 45.00 100.00 142.53 177.58 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 40.00 170.00 211.87 75.60 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 20.00 150.00 187.73 0.10 NHPP0702-407 PR I-70 Glenwood Springs Griz 11/03/20 5.00 120.00 279.24 125.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 100.00 180.00 250.00 135.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 40.00 180.00 208.63 312.00 C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 20.00 80.00 157.84 134.00 ITSITSB-002 ITS CV ROADSIDE UNITS 11/12/20 50.00 165.00 57.67 36.00 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 15.00 150.00 279.50 138.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 10.00 150.00 134.50 96.00 FSA1211-098 SH 121 & 1ST AVE 11/19/20 20.00 150.00 103.33 135.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 50.00 155.00 295.00 315.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 20.00 125.00 161.10 200.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 30.00 150.00 169.00 114.00 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 20.00 150.00 167.79 157.23 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 40.00 150.00 188.92 212.50 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 84.00 100.00 227.50 270.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 250.00 161.84 161.84 161.84 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 80.00 200.00 199.32 160.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 200.00 192.00 208.56 208.56 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,189.00 160.56 186.28 172.28 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,824.00 147.23 157.38 133.81 =============== 208-00107 Rem Trash Hour =================================================== STA0142-066 SH 14 New Raymer West 01/09/20 20.00 45.00 81.25 45.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 135 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00107 Rem Trash Hour =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 10.00 100.00 185.12 250.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 80.00 70.00 80.00 80.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 20.00 50.00 137.70 60.00 STA006A-067 SH 6 Merino to Atwood 01/16/20 20.00 45.00 99.50 115.00 STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 40.00 200.00 59.45 83.90 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 40.00 100.00 76.88 78.76 PWQM240-172 El Paso County, north Colorad 01/23/20 8.00 200.00 355.00 220.00 STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 20.00 110.00 69.00 69.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 30.00 100.00 180.00 60.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 12.00 100.00 234.94 194.88 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 35.00 120.00 134.20 54.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 40.00 60.00 68.00 61.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 40.00 125.00 69.45 75.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 20.00 150.00 138.88 135.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 40.00 100.00 100.85 85.00 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 15.00 200.00 58.70 37.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 40.00 100.00 82.02 71.17 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 40.00 100.00 190.00 170.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 208.00 120.00 112.61 87.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 72.00 110.00 84.33 43.70 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 10.00 112.00 106.40 210.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 860.00 108.14 110.57 86.12 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 12.00 185.00 144.54 234.82 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 40.00 100.00 126.60 161.50 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 28.00 70.00 56.50 10.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 40.00 80.00 72.16 80.40 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 20.00 110.00 41.88 43.75 SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 30.00 150.00 50.00 50.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 80.00 115.00 170.02 110.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 10.00 100.00 296.67 300.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 24.00 40.00 106.88 100.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 4.00 80.00 112.67 60.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 30.00 50.00 63.59 30.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 100.00 90.00 46.25 19.00 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 20.00 120.00 104.18 1.00 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 200.00 75.00 62.44 45.00 NH050A-037 US 50A Pueblo Regional Pond IM025A-048 Northbound I-25 bridge at Exi 05/28/20 60.00 120.00 108.33 110.00 NHPPR100-251 SH 2/ Vasquez 06/25/20 20.00 85.00 60.85 66.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 718.00 92.42 87.91 68.72 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 30.00 10.00 56.28 20.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 136 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00107 Rem Trash Hour =================================================== NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 10.00 100.00 98.51 138.04 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 20.00 89.00 128.67 46.00 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 20.00 150.00 57.50 45.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 20.00 70.00 56.75 45.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 20.00 85.00 50.00 65.00 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 4.00 65.00 237.20 215.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 10.00 95.00 120.29 65.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 60.00 91.75 76.63 100.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 24.00 94.56 94.56 94.56 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 10.00 100.00 151.12 85.00 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 5.00 60.00 173.00 55.00 SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 30.00 100.00 50.00 50.00 CR400-374 FY 20 Culvert Prioritization 09/17/20 3.00 117.00 173.00 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 266.00 85.77 86.81 69.59 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 15.00 120.00 153.10 40.50 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 40.00 150.00 67.27 77.80 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 20.00 100.00 65.68 0.10 NHPP0702-407 PR I-70 Glenwood Springs Griz 11/03/20 5.00 120.00 192.19 150.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 100.00 100.00 104.67 48.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 40.00 80.00 99.83 65.75 C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 10.00 120.00 121.30 37.00 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 10.00 110.00 259.75 79.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 10.00 100.00 69.25 33.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 10.00 123.00 77.00 64.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 15.00 180.00 72.15 70.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 5.00 50.00 98.36 47.00 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 24.00 90.00 133.28 147.34 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 40.00 75.00 107.68 106.25 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 28.00 50.00 100.00 75.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 160.00 60.00 78.80 66.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 532.00 88.80 93.34 67.46 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,376.00 96.56 96.11 74.83 =============== 208-00146 Pre-fab Conc Washout Str (Type 2) Each =================================================== FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 4.00 2250.00 1908.29 750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 2250.00 1908.29 750.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 2250.00 1908.29 750.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 137 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00200 Erosion Control Management LUMP SUM =============================================== STM094A-038 SH94 WB PASSING LANE 09/01/20 1.00 34588.91 34588.91 34588.91 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 34588.91 34588.91 34588.91 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1.00 124577.31 124577.31 124577.31 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1.00 1118176.50 1196448.86 1196448.86 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 621376.91 660513.09 660513.09 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 425780.91 451871.69 451871.69 =============== 208-00207 Erosion Control Management Day ==================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 32.00 150.00 305.00 305.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 102.00 175.00 384.58 596.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 120.00 250.00 251.64 140.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 60.00 200.00 252.51 105.01 PWQM240-172 El Paso County, north Colorad 01/23/20 90.00 200.00 626.00 922.00 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 75.00 200.00 515.11 380.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 100.00 200.00 144.60 50.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 25.00 500.00 415.00 400.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 36.00 200.00 334.17 165.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 35.00 600.00 630.65 435.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 90.00 215.00 206.01 400.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 80.00 250.00 521.68 600.03 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 29.00 500.00 375.50 351.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 90.00 230.00 175.88 139.16 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 75.00 200.00 598.33 540.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 131.00 210.00 281.04 427.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 36.00 280.00 262.55 280.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 58.00 250.00 261.00 275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,264.00 237.33 317.60 372.21 IM0761-226 I76/SH52 Interchange 04/02/20 275.00 160.00 188.33 106.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 24.00 150.00 470.67 1000.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 30.00 230.00 218.75 62.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 138 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00207 Erosion Control Management Day ==================================================== SFTY2254-091 225 Ramp Improvements 04/09/20 40.00 250.00 209.00 238.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 150.00 250.00 287.70 275.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 110.00 240.00 474.33 634.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 60.00 150.00 186.63 145.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 36.00 250.00 209.70 150.00 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 35.00 250.00 472.77 125.00 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 108.00 350.00 192.69 50.00 NH050A-037 US 50A Pueblo Regional Pond -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 868.00 222.29 242.25 229.74 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 35.00 200.00 489.38 475.00 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 10.00 500.00 475.50 150.00 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 30.00 230.00 199.70 142.40 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 30.00 300.00 81.75 95.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 50.00 300.00 72.50 95.00 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 20.00 1000.00 200.00 200.00 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 15.00 100.00 262.80 270.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 80.00 196.55 135.28 25.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 80.00 250.00 216.73 45.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 50.00 500.00 191.13 288.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 27.00 180.00 356.52 427.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 427.00 304.41 215.80 162.95 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 144.00 230.00 146.60 160.00 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 45.00 380.00 342.02 455.56 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 200.00 240.00 289.73 50.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 100.00 270.00 358.33 145.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 15.00 300.00 544.00 523.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 80.00 150.00 805.67 204.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 584.00 242.67 352.51 157.89 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,143.00 243.28 283.53 264.61 =============== 208-00300 Temporary Berms Lin Foot =============================================== PWQM240-172 El Paso County, north Colorad 01/23/20 250.00 8.00 11.50 10.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 139 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00300 Temporary Berms Lin Foot =============================================== STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 100.00 1.00 25.98 20.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 75,000.00 1.00 1.76 3.03 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 75,350.00 1.02 1.80 3.08 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 3,600.00 3.36 3.36 3.36 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 2,000.00 2.06 3.72 3.72 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5,600.00 2.90 3.49 3.49 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 80,950.00 1.15 1.84 3.10 =============== 208-00301 Temporary Diversion Lin Foot =============================================== HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 123.00 276.00 100.30 180.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 123.00 276.00 100.30 180.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 123.00 276.00 100.30 180.00 =============== 208-00400 Water Control LUMP SUM =============================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1.00 30000.00 95613.33 150000.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1.00 60000.00 116225.25 43000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 45000.00 110603.82 96500.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1.00 72000.00 65446.23 65446.23 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 72000.00 65446.23 65446.23 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 1.00 55000.00 47858.19 39849.11 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 1.00 18000.00 14666.67 20000.00 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 1.00 35000.00 14000.00 15000.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 1.00 50000.00 56000.00 15000.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 140 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00400 Water Control LUMP SUM =============================================== NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 1.00 60000.00 65000.00 65000.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 117208.88 126980.29 126980.29 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 55868.15 44208.63 46971.57 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 1.00 50000.00 33994.60 6373.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 1.00 10000.00 63055.00 18650.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1.00 335797.14 398165.73 398165.73 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 131932.38 78872.39 141062.91 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 74417.17 74145.80 80288.70 =============== 209-00600 Dust Palliative (Mg Cl) Gallon ================================================= NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 100,000.00 0.90 1.04 1.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 100,000.00 0.90 1.04 1.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 100,000.00 0.90 1.04 1.20 =============== 210-00001 Res Structure Each =================================================== C1601-082 Hawkins Signal and Curb Ramps 04/30/20 1.00 1000.00 1098.33 2300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 1000.00 1098.33 2300.00 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 1.00 2500.00 1100.00 2200.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 6.00 2000.00 2241.45 2107.23 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 3.00 50.00 710.65 489.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 1465.00 1634.02 1631.04 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 1.00 10000.00 11050.00 4480.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 10000.00 11050.00 4480.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 2137.50 2548.83 1924.20 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 141 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00002 Reset Structure LUMP SUM =============================================== SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1.00 10000.00 7318.80 9064.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 10000.00 7318.80 9064.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 10000.00 7318.80 9064.00 =============== 210-00010 Res Mailbox Str Each =================================================== STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 1.00 500.00 476.67 1000.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 7.00 375.00 427.37 423.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 390.63 429.87 495.56 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 2.00 500.00 696.59 232.94 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 500.00 696.59 232.94 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 2.00 250.00 670.00 808.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 250.00 670.00 808.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 385.42 498.38 503.87 =============== 210-00011 Res Mailbox Str (Ty 1) Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 81.00 241.00 169.76 181.00 STA006A-067 SH 6 Merino to Atwood 01/16/20 7.00 300.00 399.02 350.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 10.00 250.00 328.00 306.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 17.00 500.00 426.70 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 115.00 283.66 229.14 234.53 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 1.00 300.00 456.00 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 300.00 456.00 500.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 142 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00011 Res Mailbox Str (Ty 1) Each =================================================== STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 1.00 500.00 555.00 250.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 4.00 200.00 304.53 235.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 260.00 323.80 238.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 121.00 282.82 237.33 236.87 =============== 210-00012 Res Mailbox Str (Ty 2) Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 14.00 333.00 190.89 204.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 3.00 500.00 400.50 381.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 17.00 362.47 217.09 235.24 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 1.00 250.00 379.53 235.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 250.00 379.53 235.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18.00 356.22 235.14 235.22 =============== 210-00013 Res Mailbox Str (Ty 3) Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 9.00 483.00 369.71 397.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 2.00 500.00 788.06 900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11.00 486.09 445.78 488.45 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 1.00 375.00 485.50 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 375.00 485.50 500.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 1.00 300.00 479.53 235.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 300.00 479.53 235.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13.00 463.23 452.65 469.85 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 143 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00015 Res End Section Each =================================================== STR2871-038 US 287 Passing Lanes Springfi 03/05/20 3.00 1000.00 1267.17 530.01 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 1000.00 1267.17 530.01 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1.00 4893.00 4893.00 4893.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 4893.00 4893.00 4893.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 1973.25 1785.14 1620.76 =============== 210-00060 Res Marker Each =================================================== SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1.00 225.00 8320.00 11700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 225.00 8320.00 11700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 225.00 8320.00 11700.00 =============== 210-00065 Res Monument (Ty 3A) Each =================================================== C R100-288 R1 CURB RAMPS - PH 2 09/03/20 9.00 1000.00 975.75 1550.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 17.00 1000.00 366.36 306.79 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 26.00 1000.00 603.10 737.13 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26.00 1000.00 603.10 737.13 =============== 210-00090 Res Delineator Each =================================================== STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 356.00 25.00 16.50 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 356.00 25.00 16.50 15.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 100.00 2.00 45.63 31.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 100.00 2.00 45.63 31.25 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 144 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00090 Res Delineator Each =================================================== C R100-288 R1 CURB RAMPS - PH 2 09/03/20 3.00 100.00 169.17 24.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 100.00 169.17 24.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 459.00 20.48 25.72 18.60 =============== 210-00200 Reset Flagpole Each =================================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 650.00 1176.71 1650.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 650.00 1176.71 1650.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 650.00 1176.71 1650.00 =============== 210-00300 Res Brick Pavers Sq Yard ================================================ STRR300-249 Grand and Jackson Counties AD 03/05/20 15.00 100.00 169.17 150.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 21.00 200.00 123.33 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 36.00 158.33 142.43 126.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 36.00 158.33 142.43 126.67 =============== 210-00425 Res Bridge Railing Lin Foot =============================================== NHPPR100-251 SH 2/ Vasquez 06/25/20 40.00 80.00 106.23 91.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 40.00 80.00 106.23 91.45 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 92.00 130.00 214.86 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 92.00 130.00 214.86 12.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 132.00 114.85 202.85 36.08 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 145 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00427 Res Pipe Handrailing Lin Foot =============================================== HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 29.00 30.00 42.90 43.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 29.00 30.00 42.90 43.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 29.00 30.00 42.90 43.50 =============== 210-00473 Res TV Cameras Each =================================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1.00 1200.00 1223.33 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1200.00 1223.33 1200.00 IM0761-226 I76/SH52 Interchange 04/02/20 1.00 1500.00 646.57 700.66 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 1.00 2500.00 679.33 460.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 2000.00 656.40 580.33 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1.00 5769.75 5769.75 5769.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 5769.75 5769.75 5769.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 2742.44 1143.13 2032.60 =============== 210-00475 Res CCTV Pole Each =================================================== IM0761-226 I76/SH52 Interchange 04/02/20 1.00 1500.00 3175.71 3962.28 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 1500.00 3175.71 3962.28 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 8500.00 9095.00 9095.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 8500.00 9095.00 9095.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1.00 15172.50 15172.50 15172.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 146 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00475 Res CCTV Pole Each =================================================== NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1.00 1587.17 2585.51 2585.51 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 8379.84 8879.01 8879.01 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 6689.92 4908.30 7703.82 =============== 210-00476 Reset MVRD Each =================================================== SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 8.00 16000.00 714.20 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 16000.00 714.20 350.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 10.00 800.00 1090.00 1230.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 800.00 1090.00 1230.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18.00 7555.56 839.47 838.89 =============== 210-00477 Reset Weather Station Each =================================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 16000.00 17120.00 17120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 16000.00 17120.00 17120.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 16000.00 17120.00 17120.00 =============== 210-00479 Res Radio Com Antenna Each =================================================== FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 3.00 850.00 796.67 950.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 2.00 1000.00 574.10 338.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 910.00 679.53 705.40 FSAC010-124 US 40, US 287, SH 88 08/06/20 1.00 1000.00 778.33 750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1000.00 778.33 750.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 147 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00479 Res Radio Com Antenna Each =================================================== FSA1211-098 SH 121 & 1ST AVE 11/19/20 1.00 1000.00 479.33 525.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1000.00 479.33 525.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 935.71 667.36 686.00 =============== 210-00530 Rebuild Port of Present Str Sq Foot ================================================ NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 16.00 550.00 760.00 420.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 40.00 125.00 229.00 218.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 56.00 246.43 380.71 275.71 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 194.00 97.00 69.60 69.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 194.00 97.00 69.60 69.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 250.00 130.47 183.47 115.77 =============== 210-00750 Res Light Standard Each =================================================== IM0761-226 I76/SH52 Interchange 04/02/20 10.00 1400.00 1550.30 1189.32 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 1400.00 1550.30 1189.32 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 4.00 2500.00 2995.00 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 2500.00 2995.00 500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 1714.29 1761.72 992.37 =============== 210-00760 Res Luminaire Each =================================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 6.00 400.00 395.00 380.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 148 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00760 Res Luminaire Each =================================================== HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 2.00 380.00 244.50 247.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 395.00 367.64 346.75 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 2.00 350.00 277.67 270.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 350.00 277.67 270.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 386.00 348.36 331.40 =============== 210-00805 Res Overhead Sign Str Each =================================================== MPC040-061 R2 FY 21 Sign Replacement 10/01/20 2.00 11091.89 21625.00 20000.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 7.00 25188.92 26750.00 26750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9.00 22056.25 24886.36 25250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 22056.25 24886.36 25250.00 =============== 210-00810 Res Ground Sign Each =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 1.00 400.00 1689.59 255.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 3.00 230.00 325.00 325.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 5.00 295.00 317.04 340.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 12.00 300.00 348.67 500.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 1.00 300.00 462.00 650.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 5.00 300.00 366.67 275.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 138.00 175.00 224.60 193.81 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 4.00 300.00 301.86 290.92 STRR300-249 Grand and Jackson Counties AD 03/05/20 30.00 400.00 540.00 500.00 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 7.00 400.00 224.38 50.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 36.00 400.00 440.00 500.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 10.00 260.00 350.97 388.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 10.00 200.00 388.50 392.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 4.00 400.00 351.00 165.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 266.00 258.33 323.06 303.29 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 5.00 250.00 490.00 450.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 149 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00810 Res Ground Sign Each =================================================== IM0761-226 I76/SH52 Interchange 04/02/20 5.00 300.00 292.29 424.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 7.00 280.00 562.50 1000.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 10.00 300.00 456.25 437.50 SFTY2254-091 225 Ramp Improvements 04/09/20 4.00 400.00 720.00 700.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 7.00 300.00 358.33 375.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 2.00 300.00 628.67 322.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 2.00 250.00 180.88 150.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 2.00 255.00 367.67 120.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 8.00 300.00 266.72 500.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 2.00 300.00 270.21 270.21 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 8.00 320.00 453.00 593.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 62.00 299.68 373.89 510.30 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 5.00 300.00 293.75 500.00 STMM086-083 ADA PUEBLO METRO 07/09/20 72.00 200.00 325.00 250.00 MTCER300-255 MTCE R3 FY20/21 Signal Replac 07/09/20 25.00 300.00 387.50 200.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 10.00 400.00 247.50 220.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 13.00 600.00 236.00 50.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 31.00 200.00 317.00 260.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 30.00 350.00 552.02 264.09 MTCE0702-386 Grand Junction 09/03/20 2.00 1000.00 495.00 385.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 5.00 315.00 412.93 500.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 250.00 271.58 271.58 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 194.00 287.24 377.06 246.77 MPC040-061 R2 FY 21 Sign Replacement 10/01/20 1.00 318.27 400.00 450.00 MTCE0253-271 FY20 I-25 SIGN REPL PHASE 1 10/08/20 1.00 340.00 458.00 385.00 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 22.00 300.00 263.33 250.00 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 50.00 300.00 265.94 347.82 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 1.00 300.00 588.00 600.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 5.00 500.00 370.00 440.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1.00 426.39 426.39 426.39 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 16.00 400.00 378.17 435.00 CR100-342 US-6 at Garrison 12/17/20 16.00 300.00 302.50 50.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 22.00 879.92 941.51 941.51 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 135.00 415.13 338.29 410.56 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 657.00 302.99 347.66 328.18 =============== 210-00815 Res Sign Panel Each =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 4.00 100.00 1083.97 26.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 150 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00815 Res Sign Panel Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 8.00 150.00 212.03 227.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 1.00 350.00 100.00 100.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 1.00 200.00 256.00 176.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 7.00 120.00 138.34 150.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 5.00 195.00 291.02 370.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 5.00 50.00 204.67 270.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 4.00 200.00 61.16 72.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 29.00 450.00 232.00 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 64.00 282.27 244.53 168.66 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 23.00 400.00 99.06 93.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 6.00 90.00 375.00 160.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 15.00 200.00 211.67 150.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 3.00 165.00 341.67 500.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 8.00 180.00 170.25 173.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 55.00 266.82 149.96 149.94 FSAC010-124 US 40, US 287, SH 88 08/06/20 3.00 500.00 203.33 115.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 1.00 100.00 370.02 264.09 MTCE0702-386 Grand Junction 09/03/20 27.00 100.00 186.67 60.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 5.00 150.00 129.67 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 36.00 140.28 188.59 68.86 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 5.00 200.00 264.50 154.00 FSA1211-098 SH 121 & 1ST AVE 11/19/20 2.00 250.00 175.00 120.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 3.00 200.00 242.50 315.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 3.00 250.00 267.50 267.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 13.00 219.23 245.64 212.12 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 168.00 241.90 196.22 144.51 =============== 210-00816 Res Sign Panel (Spec) Each =================================================== HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 3.00 1000.00 442.50 225.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 1000.00 442.50 225.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 151 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00816 Res Sign Panel (Spec) Each =================================================== SFTY2254-091 225 Ramp Improvements 04/09/20 2.00 4000.00 1500.00 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 4000.00 1500.00 1500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 2200.00 865.50 735.00 =============== 210-00825 Res Flashing Beacon Each =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 2.00 2000.00 2500.00 2500.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 1.00 2500.00 4689.17 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 2166.67 4141.88 2666.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 2166.67 4141.88 2666.67 =============== 210-00827 Res Pull Box Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 4.00 700.00 1249.33 1843.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 1.00 550.00 1591.00 1600.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 1.00 800.00 1448.17 1400.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 13.00 1000.00 691.67 660.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 2.00 1000.00 324.58 316.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 2.00 270.00 888.00 896.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 23.00 856.09 792.19 929.39 IM0761-226 I76/SH52 Interchange 04/02/20 2.00 750.00 546.75 709.14 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 1.00 350.00 1176.67 1050.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 616.67 657.91 822.76 STMM086-083 ADA PUEBLO METRO 07/09/20 12.00 850.00 925.00 850.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 2.00 1200.00 1284.00 1284.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 14.00 900.00 952.62 912.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 152 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00827 Res Pull Box Each =================================================== STRM331-008 ADA RAMPS WALSENBURG 10/15/20 9.00 300.00 761.67 1000.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1.00 1575.00 1575.00 1575.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 427.50 790.71 1057.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 768.30 804.50 943.75 =============== 210-00831 Res Traf Sig Head Each =================================================== FSA2873-194 US 287 Longmont Intersection 02/13/20 2.00 700.00 907.50 330.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 700.00 907.50 330.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 3.00 350.00 2826.67 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 350.00 2826.67 5000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 490.00 1730.00 3132.00 =============== 210-00840 Res Traf Sig Pole Each =================================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1.00 4200.00 5366.67 5200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 4200.00 5366.67 5200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 4200.00 5366.67 5200.00 =============== 210-00845 Res Traf Sig Cntrlr Each =================================================== NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 1.00 1000.00 4112.50 4925.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1000.00 4112.50 4925.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1000.00 4112.50 4925.00 =============== 210-00846 Port Non-Intrus Traf Sens (Reset) Each =================================================== FSA1211-098 SH 121 & 1ST AVE 11/19/20 4.00 1500.00 727.33 270.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 1500.00 727.33 270.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 1500.00 727.33 270.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 153 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00855 Res Traf Sig Control Cab Each =================================================== NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 1.00 5000.00 3909.33 2365.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 1.00 2500.00 6660.00 3650.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 2.00 2000.00 2653.20 266.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 2875.00 3640.00 1636.75 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1.00 2065.91 2635.55 2635.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 2065.91 2635.55 2635.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 2713.18 3580.91 1836.51 =============== 210-00858 Res Pedestal Pole Each =================================================== HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1.00 800.00 999.00 1008.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 800.00 999.00 1008.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 6.00 700.00 1236.00 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 700.00 1236.00 250.00 STMM086-083 ADA PUEBLO METRO 07/09/20 1.00 1000.00 3300.00 2500.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 1.00 1000.00 2716.67 2000.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 3.00 1500.00 2942.67 4300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 1300.00 2944.26 3480.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 958.33 2138.70 1659.00 =============== 210-00859 Mod Ped Push Button Each =================================================== SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 3.00 500.00 339.75 195.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 500.00 339.75 195.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 500.00 339.75 195.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 154 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00860 Res Ped Push Button Each =================================================== HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 5.00 450.00 277.50 280.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 450.00 277.50 280.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 2.00 150.00 808.33 450.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 3.00 700.00 508.83 655.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 6.00 650.00 330.26 300.28 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 11.00 572.73 442.90 424.24 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 3.00 50.00 205.50 195.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 50.00 205.50 195.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19.00 457.89 383.65 350.09 =============== 210-00865 Res Ped Sig Head Each =================================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 4.00 200.00 550.45 603.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 200.00 550.45 603.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 200.00 550.45 603.00 =============== 210-00867 Res Fire Preempt Unit Each =================================================== FSA2873-194 US 287 Longmont Intersection 02/13/20 1.00 1000.00 1001.83 635.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 2.00 900.00 1848.33 1800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 933.33 1425.08 1411.67 C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 3.00 1000.00 854.83 800.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 3.00 500.00 927.33 1090.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 750.00 891.08 945.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 155 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00867 Res Fire Preempt Unit Each =================================================== SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 5.00 450.00 655.00 800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 450.00 655.00 800.00 FSA1211-098 SH 121 & 1ST AVE 11/19/20 1.00 1500.00 984.67 440.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1500.00 984.67 440.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15.00 736.67 991.73 956.33 =============== 210-00870 Res Coordination Unit Each =================================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 2.00 1000.00 880.00 850.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1.00 500.00 666.00 672.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 833.33 826.50 790.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 833.33 826.50 790.67 =============== 210-00882 Res Detector Each =================================================== SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 2.00 1000.00 1048.00 1240.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 1000.00 1048.00 1240.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1000.00 1048.00 1240.00 =============== 210-00890 Res Int Detect Sys (Camera) Each =================================================== FSA2873-194 US 287 Longmont Intersection 02/13/20 1.00 1400.00 1495.50 1050.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1.00 1000.00 1641.21 1625.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1200.00 1578.76 1337.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1200.00 1578.76 1337.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 156 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-01000 Res Fence Lin Foot =============================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 24.00 25.00 28.44 34.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 315.00 15.00 12.43 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 339.00 15.71 13.57 13.56 IM0761-226 I76/SH52 Interchange 04/02/20 302.00 30.00 11.00 10.39 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 165.00 75.00 16.51 27.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 100.00 40.00 19.10 22.00 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 1,117.00 6.00 6.78 3.00 NH050A-037 US 50A Pueblo Regional Pond -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,684.00 19.08 9.26 7.85 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 97.00 20.00 7.00 7.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 33.00 25.00 20.80 10.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 2,167.00 7.85 5.65 4.90 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 48.00 25.00 49.50 32.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,345.00 8.94 6.45 5.61 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 10.00 100.00 51.67 25.00 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 575.00 50000.00 22.81 22.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 585.00 49147.01 23.11 22.64 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,953.00 5816.56 9.10 8.93 =============== 210-01010 Res Gate Post Each =================================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 2.00 1000.00 473.33 460.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1000.00 473.33 460.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1000.00 473.33 460.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 157 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-01011 Res Gate Each =================================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1.00 500.00 490.00 470.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 500.00 490.00 470.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 3.00 450.00 367.57 440.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 450.00 367.57 440.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 1.00 600.00 4956.67 4350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 600.00 4956.67 4350.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 490.00 1213.08 1228.00 =============== 210-01050 Res C L Fence Lin Foot =============================================== SHE 0703-461 I-70 and Kipling North Phase 03/26/20 400.00 20.00 17.00 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 400.00 20.00 17.00 13.00 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 225.00 20.00 42.79 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 225.00 20.00 42.79 15.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 50.00 13.00 35.00 36.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 50.00 13.00 35.00 36.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 675.00 19.48 26.81 15.37 =============== 210-01130 Res Gdrail Ty 3 Lin Foot =============================================== IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 871.00 35.00 24.72 24.44 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 158 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-01130 Res Gdrail Ty 3 Lin Foot =============================================== NHPPR100-251 SH 2/ Vasquez 06/25/20 25.00 40.00 118.35 60.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 896.00 35.14 27.33 25.45 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 150.00 60.00 125.00 75.00 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 170.00 50.00 24.09 19.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 320.00 54.69 61.47 45.31 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,216.00 40.28 37.96 30.68 =============== 210-01170 Res Gdrail Ty 7 Lin Foot =============================================== NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 43.00 40.00 34.46 32.16 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 43.00 40.00 34.46 32.16 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 43.00 40.00 34.46 32.16 =============== 210-01190 Reset Tensioned Cable Barrier Lin Foot =============================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 7,040.00 20.00 17.70 17.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7,040.00 20.00 17.70 17.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,040.00 20.00 17.70 17.60 =============== 210-01200 Res End Anchorage Each =================================================== IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 3.00 1800.00 3472.22 3444.44 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 1800.00 3472.22 3444.44 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 2.00 2500.00 1857.23 1275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 2500.00 1857.23 1275.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 2080.00 2664.73 2576.66 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 159 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-01700 Res Sprinkler Head Each =================================================== C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 15.00 60.00 78.34 52.68 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 15.00 60.00 78.34 52.68 CR100-342 US-6 at Garrison 12/17/20 15.00 90.00 253.00 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 15.00 90.00 253.00 35.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 75.00 173.61 43.84 =============== 210-01710 Res Valve Each =================================================== STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 9.00 500.00 1516.24 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9.00 500.00 1516.24 2500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 500.00 1516.24 2500.00 =============== 210-02003 Relay Pipe (3 In) Lin Foot =============================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 400.00 15.00 38.91 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 400.00 15.00 38.91 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 400.00 15.00 38.91 50.00 =============== 210-02004 Relay Pipe (4 In) Lin Foot =============================================== SFTY2254-091 225 Ramp Improvements 04/09/20 35.00 100.00 39.50 54.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 35.00 100.00 39.50 54.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 35.00 100.00 39.50 54.00 =============== 210-02042 Relay Pipe (42 In) Lin Foot =============================================== NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 60.00 320.00 417.44 417.44 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 60.00 320.00 417.44 417.44 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 60.00 320.00 417.44 417.44 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 160 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-02048 Relay Pipe (48 In) Lin Foot =============================================== NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 12.00 100.00 526.00 529.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 12.00 100.00 526.00 529.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 100.00 526.00 529.00 =============== 210-02510 Relay Sprinkler System LUMP SUM =============================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1.00 10000.00 15166.67 29600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 10000.00 15166.67 29600.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 1.00 8000.00 3783.33 2350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 8000.00 3783.33 2350.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 1.00 10000.00 14816.33 5300.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 1.00 5000.00 16867.23 10536.13 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 7500.00 15748.56 7918.07 CR100-342 US-6 at Garrison 12/17/20 1.00 8000.00 20908.33 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 8000.00 20908.33 5000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 8200.00 15458.01 10557.23 =============== 210-02804 Grinding: Sidwlk and/or Curb Ramp Repair Lin Foot =============================================== STRR300-249 Grand and Jackson Counties AD 03/05/20 137.00 30.00 59.83 34.00 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 66.00 30.00 34.26 41.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 203.00 30.00 49.83 36.28 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 161 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-02804 Grinding: Sidwlk and/or Curb Ramp Repair Lin Foot =============================================== STMM086-083 ADA PUEBLO METRO 07/09/20 991.00 10.00 51.00 50.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 231.00 35.00 54.00 37.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,222.00 14.73 51.78 47.54 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,425.00 16.90 51.39 45.94 =============== 210-04010 Adj Manhole Each =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 4.00 750.00 875.00 875.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 49.00 750.00 1287.60 1259.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 8.00 700.00 750.00 600.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 92.00 800.00 2131.88 2778.75 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 1.00 1000.00 941.80 729.00 STRR300-249 Grand and Jackson Counties AD 03/05/20 2.00 750.00 730.67 480.00 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 2.00 750.00 561.25 310.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 18.00 1000.00 1661.67 1300.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 4.00 2000.00 1183.96 2500.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1.00 700.00 1303.20 1166.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 181.00 826.80 1615.53 2002.82 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 10.00 1700.00 2107.65 2480.98 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 3.00 1500.00 964.50 1000.00 IM0761-226 I76/SH52 Interchange 04/02/20 7.00 1000.00 910.30 530.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 2.00 750.00 1552.99 227.00 SFTY2254-091 225 Ramp Improvements 04/09/20 1.00 850.00 1337.50 1685.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 3.00 1000.00 2103.33 755.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 26.00 1301.92 1419.71 1381.68 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 1.00 1000.00 992.80 1615.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 2.00 750.00 600.00 300.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 6.00 750.00 828.33 605.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 2.00 750.00 777.91 549.54 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 15.00 750.00 996.29 1000.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 162 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-04010 Adj Manhole Each =================================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 500.00 535.00 535.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 27.00 750.00 928.27 832.56 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 2.00 1000.00 683.33 500.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 122.00 1200.00 917.00 635.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 5.00 900.00 1069.99 1100.00 CR100-342 US-6 at Garrison 12/17/20 3.00 750.00 639.17 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 132.00 1175.38 910.79 647.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 366.00 980.60 1243.83 1383.56 =============== 210-04015 Modify Manhole Each =================================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1.00 5000.00 2440.00 3200.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1.00 2800.00 3251.50 6700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 3900.00 3030.18 4950.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 3900.00 3030.18 4950.00 =============== 210-04016 Modify Manhole (Spec) Each =================================================== SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1.00 1500.00 2575.00 4125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1500.00 2575.00 4125.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1500.00 2575.00 4125.00 =============== 210-04020 Modify Inlet Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 18.00 2250.00 4185.00 4005.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 18.00 2250.00 4185.00 4005.00 IM0761-226 I76/SH52 Interchange 04/02/20 1.00 2700.00 2955.06 2100.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 163 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-04020 Modify Inlet Each =================================================== SFTY2254-091 225 Ramp Improvements 04/09/20 1.00 3500.00 4745.00 4890.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 3100.00 3352.83 3495.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 1.00 7500.00 4702.50 5700.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 6.00 6000.00 5081.62 5808.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7.00 6214.29 5018.44 5792.67 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 2.00 3500.00 1916.67 500.00 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 1.00 2500.00 8220.00 12560.00 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 3.00 2000.00 8010.07 5650.00 CR100-342 US-6 at Garrison 12/17/20 4.00 5000.00 3891.67 1650.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 3550.00 4801.21 3711.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 37.00 3397.30 4528.23 4236.18 =============== 210-04025 Modify Structure Each =================================================== STRR300-249 Grand and Jackson Counties AD 03/05/20 3.00 7000.00 1259.67 870.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 7000.00 1259.67 870.00 NHPPR100-251 SH 2/ Vasquez 06/25/20 1.00 5000.00 3375.15 3169.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 5000.00 3375.15 3169.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 6500.00 1644.30 1444.83 =============== 210-04050 Adj Valve Box Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 45.00 393.00 676.45 824.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 4.00 450.00 425.00 250.00 STRR300-249 Grand and Jackson Counties AD 03/05/20 3.00 400.00 695.00 1000.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 164 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-04050 Adj Valve Box Each =================================================== CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 2.00 400.00 461.25 800.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 11.00 750.00 591.67 950.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1.00 800.00 698.61 1400.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 2.00 300.00 714.20 583.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 68.00 457.87 648.92 819.06 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 6.00 1500.00 242.00 275.00 IM0761-226 I76/SH52 Interchange 04/02/20 11.00 600.00 617.30 530.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 9.00 350.00 443.33 350.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 4.00 400.00 441.67 450.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 1.00 300.00 1619.00 493.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 31.00 666.13 553.91 416.87 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 2.00 350.00 565.20 915.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 2.00 450.00 686.33 750.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 7.00 500.00 383.33 400.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 15.00 450.00 422.58 445.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 4.00 450.00 568.68 393.40 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 2.00 350.00 530.43 1000.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 5.00 500.00 511.27 278.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 37.00 455.41 471.15 480.23 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 3.00 500.00 408.33 250.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 32.00 500.00 433.33 300.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 3.00 600.00 695.00 1040.00 CR100-342 US-6 at Garrison 12/17/20 3.00 500.00 395.00 320.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 41.00 507.32 438.41 351.95 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 177.00 505.28 537.81 569.59 =============== 210-04060 Adj Water Meter Each =================================================== SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1.00 300.00 2226.00 1090.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 300.00 2226.00 1090.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 300.00 2226.00 1090.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 165 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-04200 Adj Gdrail Lin Foot =============================================== NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 12,941.00 10.00 6.94 5.88 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 9,237.50 78472.50 7.30 7.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 22,178.50 32690.18 7.03 6.47 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 75.00 100.00 40.14 41.43 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 75.00 100.00 40.14 41.43 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 22,253.50 32580.34 7.25 6.59 =============== 211-01110 Rock Reinf (Dowels) Each =================================================== C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 100.00 2000.00 1604.80 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 100.00 2000.00 1604.80 1500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 100.00 2000.00 1604.80 1500.00 =============== 211-01115 Rock Reinf (No.10) Lin Foot =============================================== C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 2,850.00 100.00 135.00 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,850.00 100.00 135.00 110.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 500.00 175.00 133.06 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 500.00 175.00 133.06 100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,350.00 111.19 134.65 108.51 =============== 211-02277 Cement Grout (Voids) Cubic Yard ============================================= STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 18.00 2000.00 1500.00 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 18.00 2000.00 1500.00 1500.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 166 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 211-02277 Cement Grout (Voids) Cubic Yard ============================================= STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 10.00 1288.00 1316.67 650.00 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 1.00 1500.00 4550.00 1000.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 85.00 1000.00 750.00 750.00 STR184B-006 CULVERTS SH 184 08/06/20 11.00 1725.00 750.00 750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 107.00 1106.12 865.49 742.99 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 30.00 700.00 1186.25 370.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 30.00 700.00 1186.25 370.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 155.00 1131.32 1007.69 758.71 =============== 211-03005 Dewatering LUMP SUM =============================================== BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 1.00 15000.00 77422.50 96000.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC PWQM240-172 El Paso County, north Colorad 01/23/20 1.00 250000.00 345000.00 400000.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1.00 15000.00 137125.60 50000.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1.00 10000.00 7538.50 5855.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 72500.00 125923.16 137963.75 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 1.00 25000.00 26949.12 15000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 25000.00 26949.12 15000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 63000.00 92931.81 113371.00 =============== 212-00006 Seeding (Native) Acre =================================================== STA0142-066 SH 14 New Raymer West 01/09/20 0.50 2500.00 3767.25 800.00 FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 0.60 850.00 1313.89 1210.00 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 0.10 10000.00 8398.33 2720.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 167 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00006 Seeding (Native) Acre =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 0.90 1500.00 825.00 825.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 3.20 950.00 970.96 1159.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 1.90 1200.00 1290.84 1050.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 0.30 3500.00 2005.00 1510.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 0.90 1000.00 1200.78 1101.56 PWQM240-172 El Paso County, north Colorad 01/23/20 11.10 1000.00 2987.50 875.00 STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 0.95 675.00 1600.00 1600.00 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 36.30 1000.00 1182.65 540.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 6.10 1000.00 630.40 452.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 0.20 3000.00 1350.00 1200.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 0.30 2000.00 4897.00 9000.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 0.50 2000.00 3060.89 4700.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 0.50 1000.00 21369.21 40000.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 0.30 550.00 3847.17 6000.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 0.65 4000.00 1654.17 1200.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 0.10 3000.00 1100.00 1200.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 120.00 500.00 405.18 390.55 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 0.20 2000.00 4550.00 8000.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 0.49 5000.00 1250.00 1250.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 10.00 500.00 1523.81 1037.79 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 1.00 800.00 2322.26 1621.19 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 5.80 2000.00 1296.67 1300.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 39.00 1000.00 759.76 840.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 0.15 5000.00 4033.15 6820.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 242.04 790.31 850.00 715.88 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 0.50 2500.00 2367.27 2097.29 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 0.50 2000.00 1690.00 1700.00 IM0761-226 I76/SH52 Interchange 04/02/20 21.30 630.00 591.03 500.11 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 2.70 2000.00 1681.67 2500.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 23.80 370.00 788.87 727.74 SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 0.25 1000.00 500.00 500.00 SFTY2254-091 225 Ramp Improvements 04/09/20 1.70 1200.00 1420.00 840.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 15.40 1000.00 577.35 473.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 0.10 1000.00 15570.17 20240.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 0.03 2000.00 8970.00 21000.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 0.15 2000.00 2608.33 1870.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 3.90 1000.00 691.25 500.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 0.16 5000.00 6907.33 3472.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 2.20 3000.00 3109.56 844.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 17.00 600.00 624.24 624.24 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 13.40 1000.00 1758.10 0.10 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 168 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00006 Seeding (Native) Acre =================================================== NH050A-035 US 50A Pueblo Regional Pond 05/28/20 28.00 1000.00 744.34 400.00 NH050A-037 US 50A Pueblo Regional Pond ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 1.60 3000.00 3023.75 1562.50 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 0.04 15000.00 4144.67 4550.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 0.42 5000.00 3444.49 1371.43 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 133.15 889.41 859.44 584.50 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 0.34 5000.00 5277.83 4950.00 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 1.50 1000.00 2349.90 1630.90 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 1.10 1500.00 7666.67 8000.00 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 0.19 1600.00 7750.00 3500.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 0.44 1600.00 6900.00 1800.00 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 0.60 2000.00 2200.00 2200.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 0.80 1000.00 1272.50 1545.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 0.10 2000.00 9574.00 17772.00 STR184B-006 CULVERTS SH 184 08/06/20 0.34 5000.00 2200.00 2200.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 0.10 2100.00 6581.14 1400.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 2.30 1443.20 1421.55 1440.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 6.00 1249.06 1249.06 1249.06 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 6.00 1600.00 1216.00 1200.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 21.00 500.00 744.01 675.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 12.00 1600.00 1531.80 1433.80 SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 0.25 2500.00 1000.00 1500.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 0.02 800.00 40666.67 11000.00 CR400-374 FY 20 Culvert Prioritization 09/17/20 0.11 5000.00 5849.25 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 53.19 1151.96 1321.00 1313.49 MPC040-061 R2 FY 21 Sign Replacement 10/01/20 0.25 2526.43 1300.00 100.00 MTCE0253-271 FY20 I-25 SIGN REPL PHASE 1 10/08/20 0.20 1000.00 2844.67 2500.00 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 0.20 1000.00 8626.67 6500.00 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 2.18 800.00 1783.00 1155.00 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 21.10 600.00 1566.29 1598.86 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 0.75 5000.00 5033.33 1500.00 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 65.40 895.00 679.63 400.00 NHPP0702-407 PR I-70 Glenwood Springs Griz 11/03/20 0.50 3000.00 3943.61 2500.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 0.50 2500.00 1956.67 3500.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 0.30 2000.00 1982.88 2940.00 C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 0.50 3000.00 2938.06 1700.00 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 0.05 5000.00 25175.00 52900.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 0.80 3500.00 2731.50 2543.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 169 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00006 Seeding (Native) Acre =================================================== STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 0.20 2000.00 3869.98 6000.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 1.00 5000.00 1758.77 1150.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 0.05 10000.00 7315.00 5630.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 65.00 450.00 707.50 749.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 151.00 628.87 672.89 672.89 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 309.98 695.94 801.71 734.56 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 738.36 794.62 880.44 743.08 =============== 212-00007 Seeding (Native) (Hydraulic) Acre =================================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 26.80 2000.00 892.70 731.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 26.80 2000.00 892.70 731.50 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 2.30 1000.00 1777.11 1800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.30 1000.00 1777.11 1800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 29.10 1920.96 954.48 815.95 =============== 212-00009 Seeding (Temporary) Acre =================================================== NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 10.00 500.00 374.50 374.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 500.00 374.50 374.50 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 10.00 698.78 461.39 461.39 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 698.78 461.39 461.39 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 0.66 669.65 669.65 669.65 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 25.00 412.37 441.24 441.24 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 25.66 418.99 447.11 447.11 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 45.66 498.01 434.34 434.34 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 170 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00022 Seeding (Riparian) Acre =================================================== FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 0.24 2464.31 2464.31 2464.31 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 0.40 2324.75 2487.48 2487.48 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 0.64 2377.09 2478.79 2478.79 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 0.64 2377.09 2478.79 2478.79 =============== 212-00024 Seeding (Upland Grassland) Acre =================================================== FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 6.91 664.28 664.28 664.28 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.91 664.28 664.28 664.28 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.91 664.28 664.28 664.28 =============== 212-00028 Seeding (Wetlands) Acre =================================================== BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 0.20 7500.00 5280.59 4500.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 0.20 7500.00 5280.59 4500.00 IM0761-226 I76/SH52 Interchange 04/02/20 0.50 3000.00 2770.45 3084.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 0.50 3000.00 2770.45 3084.60 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 0.02 10000.00 25000.00 25000.00 STR184B-006 CULVERTS SH 184 08/06/20 0.01 6400.00 25000.00 25000.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 0.24 1000.00 3865.26 4500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 0.27 1866.67 4236.05 6777.78 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 0.25 2500.00 8270.00 11650.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 171 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00028 Seeding (Wetlands) Acre =================================================== NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 0.01 5000.00 63933.33 9300.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 0.10 4800.00 6067.08 1280.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 0.70 3917.53 4191.76 4191.76 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.06 3676.67 7298.44 5724.28 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.03 3645.95 4683.75 5093.61 =============== 212-00032 Soil Conditioning Acre =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 0.60 2800.00 3826.34 3510.00 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 0.10 15000.00 28648.33 12700.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 0.90 3000.00 5250.00 5250.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 3.20 1750.00 2584.50 2812.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 1.90 3500.00 3261.74 3300.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 0.30 3500.00 3175.00 1350.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 0.90 3000.00 2808.25 2616.49 PWQM240-172 El Paso County, north Colorad 01/23/20 7.10 3000.00 3552.50 3105.00 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 36.30 3000.00 2777.94 2640.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 6.10 3000.00 3072.00 2850.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 0.20 5000.00 4500.00 3000.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 0.30 6000.00 6539.75 10000.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 0.50 2500.00 4778.75 8500.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 0.50 3100.00 32354.45 60000.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 0.30 2500.00 6497.86 7000.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 0.65 5000.00 4407.39 4725.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 0.10 5000.00 2746.00 4492.00 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 0.20 4000.00 10150.00 15000.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 0.49 8000.00 4500.00 4500.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 10.00 3000.00 3349.32 3714.75 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 1.00 3000.00 3332.75 3048.97 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 5.80 4000.00 3183.33 3100.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 0.15 4000.00 13461.80 12320.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 77.59 3118.96 3143.79 3481.01 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 0.50 5000.00 6183.96 5395.25 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 0.50 3000.00 6510.00 6500.00 IM0761-226 I76/SH52 Interchange 04/02/20 21.80 2500.00 2071.61 2305.50 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 2.70 5000.00 4378.33 5000.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 23.80 2000.00 3227.72 3655.43 SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 0.25 1000.00 500.00 500.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 172 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00032 Soil Conditioning Acre =================================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 42.20 2700.00 3242.54 2849.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 0.10 2700.00 12298.95 16185.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 0.03 5000.00 25490.00 37000.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 0.15 3000.00 7777.33 5700.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 3.90 2800.00 2517.63 2400.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 0.16 6000.00 9969.17 3720.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 2.20 3000.00 6764.29 5905.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 17.00 3100.00 3104.92 3104.92 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 13.40 3200.00 2948.75 10.00 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 1.60 5000.00 3739.25 1562.50 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 0.05 20000.00 16319.67 18000.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 0.42 10000.00 5959.87 5433.33 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 130.76 2767.82 3010.58 2769.88 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 0.34 5000.00 15440.51 6600.00 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 1.30 3200.00 6329.22 6225.00 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 0.19 2500.00 5875.00 3750.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 0.44 3000.00 4250.00 3000.00 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 0.60 6000.00 4000.00 4000.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 0.80 3500.00 3982.50 2965.00 STR184B-006 CULVERTS SH 184 08/06/20 0.34 6000.00 6000.00 6000.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 0.10 2700.00 22127.86 4400.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 2.30 4083.15 4740.43 4670.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 6.00 3957.91 3957.91 3957.91 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 2.30 3500.00 3607.89 3700.00 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 6.00 4000.00 4947.60 4500.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 21.00 2500.00 2372.57 558.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 12.00 1100.00 633.35 525.05 SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 0.25 2500.00 1000.00 1500.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 0.02 1500.00 41433.33 11000.00 CR400-374 FY 20 Culvert Prioritization 09/17/20 0.11 7000.00 9634.25 9000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 54.09 2748.73 2670.35 2019.28 MTCE0253-271 FY20 I-25 SIGN REPL PHASE 1 10/08/20 0.20 2500.00 5196.67 2500.00 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 2.18 3000.00 4846.20 4851.00 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 21.10 2500.00 1512.29 536.87 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 0.75 8000.00 11153.33 5560.00 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 65.40 2000.00 2285.88 350.00 NHPP0702-407 PR I-70 Glenwood Springs Griz 11/03/20 0.50 10000.00 4888.52 7113.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 173 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00032 Soil Conditioning Acre =================================================== NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 0.50 8000.00 6566.67 8000.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 0.30 4000.00 8101.56 10055.00 C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 0.50 10000.00 8033.84 7750.00 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 0.05 7500.00 25350.00 52900.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 0.80 5700.00 5670.00 5640.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 0.20 4500.00 6963.47 10000.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 1.00 6000.00 8876.76 6100.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 0.05 20000.00 24690.00 21380.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 8.00 3053.57 3053.57 3053.57 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 65.00 350.00 560.67 1070.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 151.90 2216.49 2371.64 2371.64 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 318.43 1910.90 1731.34 1678.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 580.87 2343.19 2413.88 2196.66 =============== 212-00050 Sod Sq Foot ================================================ HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 2,125.00 3.00 2.13 2.25 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1,577.00 5.00 3.05 2.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,702.00 3.85 2.73 2.46 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 270.00 5.00 5.50 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 270.00 5.00 5.50 8.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 200.00 5.50 8.67 7.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 300.00 5.00 4.57 1.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 3,000.00 5.00 4.30 0.79 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,500.00 5.03 4.48 1.16 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 110.00 2.75 10.00 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 110.00 2.75 10.00 4.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,582.00 4.42 3.89 2.08 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 174 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00100 Tree Retention and Protection LUMP SUM =============================================== FSAC010-124 US 40, US 287, SH 88 08/06/20 1.00 3000.00 5583.33 7500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 3000.00 5583.33 7500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 3000.00 5583.33 7500.00 =============== 212-00700 Organic Fertilizer Pound ================================================== FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 510.00 3.00 0.72 1.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 510.00 3.00 0.72 1.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 510.00 3.00 0.72 1.50 =============== 212-00701 Compost (Mech App) Cubic Yard ============================================= SHE 0703-461 I-70 and Kipling North Phase 03/26/20 70.00 60.00 99.60 132.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 70.00 60.00 99.60 132.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 69.00 40.00 46.93 78.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 69.00 40.00 46.93 78.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 139.00 50.07 65.91 105.19 =============== 212-00703 Humate Pound ================================================== SHE 0703-461 I-70 and Kipling North Phase 03/26/20 80.00 10.00 3.90 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 80.00 10.00 3.90 5.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 324.00 2.00 1.36 1.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 324.00 2.00 1.36 1.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 404.00 3.58 1.67 2.19 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 175 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00704 Mycorrhizae Pound ================================================== SHE 0703-461 I-70 and Kipling North Phase 03/26/20 20.00 20.00 25.20 27.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 20.00 25.20 27.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 33.00 15.00 9.53 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 33.00 15.00 9.53 10.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 53.00 16.89 13.47 16.42 =============== 212-00705 Elemental Sulfur Pound ================================================== SHE 0703-461 I-70 and Kipling North Phase 03/26/20 24.00 5.00 11.20 17.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 24.00 5.00 11.20 17.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 24.00 5.00 11.20 17.00 =============== 212-00706 Seed (Native) Drill Acre =================================================== SHE 0703-461 I-70 and Kipling North Phase 03/26/20 0.10 1000.00 6218.00 8250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 0.10 1000.00 6218.00 8250.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 1.30 1500.00 825.99 475.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.30 1500.00 825.99 475.00 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 0.25 8000.00 9987.00 9300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 0.25 8000.00 9987.00 9300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.65 2454.55 1724.25 2283.33 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 176 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00708 Seed (Native) Brdcst Acre =================================================== SHE 0703-461 I-70 and Kipling North Phase 03/26/20 0.30 1000.00 3792.00 5500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 0.30 1000.00 3792.00 5500.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 0.40 4000.00 1513.88 750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 0.40 4000.00 1513.88 750.00 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 0.32 5500.00 8013.13 7410.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 0.32 5500.00 8013.13 7410.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.02 3588.24 3353.41 4236.47 =============== 212-00711 Seeding (Wetland) Broadcast Acre =================================================== FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 0.20 7000.00 1798.18 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 0.20 7000.00 1798.18 1500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 0.20 7000.00 1798.18 1500.00 =============== 212-00900 Compost Cubic Yard ============================================= C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 101.00 26.00 33.04 31.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 101.00 26.00 33.04 31.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 101.00 26.00 33.04 31.00 =============== 212-01200 Landscape Restoration LUMP SUM =============================================== C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 1.00 10000.00 4000.00 5000.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1.00 6000.00 6000.00 11800.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 177 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-01200 Landscape Restoration LUMP SUM =============================================== HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1.00 1000.00 7764.25 11200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 5666.67 5932.64 9333.33 C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 1.00 2500.00 6343.33 2030.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 2500.00 6343.33 2030.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 4875.00 6055.85 7507.50 =============== 213-00000 Mulching Acre =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 0.60 2000.00 1096.57 1010.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 0.60 2000.00 1096.57 1010.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 0.60 2000.00 1096.57 1010.00 =============== 213-00002 Mulching (Weed Free Hay) Acre =================================================== STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 0.95 1200.00 2500.00 2500.00 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 36.30 800.00 879.34 660.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 6.10 2000.00 700.30 559.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 0.30 2000.00 3397.90 6000.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 0.50 7700.00 6722.33 12000.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 0.30 750.00 3676.21 6000.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 10.00 1000.00 906.94 1082.25 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 5.30 4000.00 1438.33 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 59.75 1309.71 943.50 972.64 SFTY2254-091 225 Ramp Improvements 04/09/20 1.70 1000.00 1495.00 1190.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 14.70 750.00 938.89 880.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1601-082 Hawkins Signal and Curb Ramps 04/30/20 0.03 4000.00 12663.33 24000.00 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 28.00 650.00 930.13 600.00 NH050A-037 US 50A Pueblo Regional Pond FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 0.04 5000.00 6432.00 7075.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 44.47 702.61 943.65 736.72 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 178 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00002 Mulching (Weed Free Hay) Acre =================================================== NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 1.30 1100.00 1275.39 746.60 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 0.27 2500.00 2350.00 2200.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 0.10 2000.00 8357.33 17772.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 2.30 2144.49 1155.78 1270.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 21.00 1000.00 2401.38 264.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 12.00 1100.00 1301.41 1280.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 36.97 1120.84 1885.26 735.13 MPC040-061 R2 FY 21 Sign Replacement 10/01/20 0.25 3792.53 1300.00 100.00 MTCE0253-271 FY20 I-25 SIGN REPL PHASE 1 10/08/20 0.20 1000.00 3096.67 2500.00 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 0.20 2000.00 8050.00 6500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 0.65 2381.74 4316.47 2807.69 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 141.84 1075.05 1217.58 845.18 =============== 213-00003 Mulching (Weed Free) Acre =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 0.20 5000.00 1618.73 2103.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 2.10 900.00 925.34 675.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC PWQM240-172 El Paso County, north Colorad 01/23/20 11.10 700.00 859.00 948.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 0.49 1500.00 2110.00 2110.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 1.00 1000.00 1148.87 967.03 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 39.00 650.00 706.99 635.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 53.89 700.41 736.45 726.05 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 0.50 3500.00 4218.74 3403.37 IM0761-226 I76/SH52 Interchange 04/02/20 18.40 650.00 1189.32 548.55 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 2.70 2000.00 1389.67 2500.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 0.15 1000.00 4347.67 1960.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 3.90 1000.00 1130.50 1100.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 0.10 600.00 11681.43 1446.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 13.00 800.00 792.52 792.52 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 179 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00003 Mulching (Weed Free) Acre =================================================== ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 13.40 1200.00 1907.84 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 52.15 953.02 1400.67 646.41 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 0.25 3500.00 4876.55 4560.00 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 0.34 5000.00 6805.21 4950.00 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 0.60 3000.00 2300.00 2300.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 0.80 1000.00 1905.00 1810.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 0.10 1000.00 12316.64 2800.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 3.00 510.98 510.98 510.98 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 26.00 286.28 792.52 792.52 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 31.09 458.39 1544.00 902.85 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 21.10 650.00 1291.55 1274.64 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 65.40 860.00 652.49 400.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 0.30 4000.00 4517.10 6310.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 0.80 3500.00 1875.50 1651.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 0.05 6000.00 14440.00 10880.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 116.80 546.39 584.64 584.64 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 204.45 675.36 720.90 611.88 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 341.58 701.95 889.18 661.65 =============== 213-00004 Mulching (Weed Free Straw) Acre =================================================== NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 120.00 500.00 624.20 602.61 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 120.00 500.00 624.20 602.61 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 0.16 5000.00 4979.67 4464.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 0.16 5000.00 4979.67 4464.00 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 1.22 3100.00 3566.67 3700.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 180 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00004 Mulching (Weed Free Straw) Acre =================================================== STR184B-006 CULVERTS SH 184 08/06/20 0.35 5000.00 2100.00 2100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.57 3523.57 3438.65 3343.31 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 6.90 735.00 735.00 735.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.90 735.00 735.00 735.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 128.63 555.11 662.28 647.97 =============== 213-00007 Mulching (Wood Strand) Acre =================================================== ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 29.00 7500.00 9524.40 11000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 29.00 7500.00 9524.40 11000.00 NHPP0702-407 PR I-70 Glenwood Springs Griz 11/03/20 0.50 10000.00 7379.88 14000.00 C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 0.50 10000.00 14951.11 13800.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 60.00 800.00 6895.00 6660.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 61.00 950.82 6952.33 6778.69 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 90.00 3061.11 7685.04 8138.89 =============== 213-00008 Mulching (Wood Chip) Cubic Foot ============================================= C R100-288 R1 CURB RAMPS - PH 2 09/03/20 100.00 15.00 12.96 3.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 100.00 20.00 16.50 2.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 200.00 17.50 14.57 2.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 200.00 17.50 14.57 2.65 =============== 213-00011 Mulching (Hydraulic) Acre =================================================== IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 23.80 480.00 1328.95 1157.89 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 23.80 480.00 1328.95 1157.89 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 181 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00011 Mulching (Hydraulic) Acre =================================================== NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 40.00 1200.00 1351.67 1470.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 40.00 1200.00 1351.67 1470.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 63.80 931.41 1347.91 1353.57 =============== 213-00012 Spray-on Mulch Blanket Acre =================================================== NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 0.90 4500.00 4268.96 4037.92 PWQM240-172 El Paso County, north Colorad 01/23/20 4.00 3500.00 3450.00 3400.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 0.50 3500.00 5834.49 9400.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 0.65 6000.00 4565.16 4445.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 0.10 2000.00 2610.50 4221.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 1.00 3500.00 4091.49 4141.14 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 0.15 4000.00 9231.90 11030.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7.30 3835.62 4217.86 4252.21 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 0.50 3000.00 7125.00 7000.00 IM0761-226 I76/SH52 Interchange 04/02/20 0.25 4700.00 4964.72 4380.45 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 1.50 3000.00 3825.00 2500.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 1.60 3500.00 2988.57 3000.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 10.00 3700.00 3797.55 3797.55 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 0.42 5200.00 5895.63 6807.14 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 14.27 3641.14 3745.70 3782.73 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 2.30 4500.00 3746.58 3500.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 0.02 300.00 61950.00 11000.00 CR400-374 FY 20 Culvert Prioritization 09/17/20 0.11 8000.00 10137.50 7000.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 10.00 3411.07 3754.12 3754.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.43 3648.17 3986.42 3747.48 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 1.05 5000.00 5122.00 4240.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 182 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00012 Spray-on Mulch Blanket Acre =================================================== NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 0.75 7000.00 6295.00 5760.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 0.50 5000.00 6470.00 7500.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 1.00 4000.00 7962.34 5900.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 10.00 3247.42 3474.74 3474.74 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 13.30 3719.86 5221.60 3997.70 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 47.30 3695.14 4236.49 3906.37 =============== 213-00061 Mulch Tackifier Pound ================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 120.00 3.00 3.83 3.60 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 160.00 6.00 1.75 0.90 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 400.00 3.50 3.14 2.85 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC PWQM240-172 El Paso County, north Colorad 01/23/20 2,420.00 3.10 2.78 3.05 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 7,260.00 5.00 6.01 2.88 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 1,300.00 2.50 1.89 1.60 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 56.00 5.00 14.93 10.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 100.00 5.00 17.28 30.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 60.00 3.00 12.54 24.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 24,000.00 4.00 2.05 1.95 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 98.00 100.00 4.50 4.50 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 2,000.00 5.00 2.83 3.04 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1,060.00 6.00 1.67 1.15 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 5,200.00 2.75 2.48 2.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 44,234.00 4.23 3.07 2.39 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 100.00 10.00 8.16 9.45 IM0761-226 I76/SH52 Interchange 04/02/20 3,680.00 2.40 2.49 2.35 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 540.00 3.00 2.83 2.00 SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 40.00 3.00 20.00 20.00 SFTY2254-091 225 Ramp Improvements 04/09/20 340.00 5.00 2.30 0.60 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 7,156.00 3.00 2.11 2.22 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1601-082 Hawkins Signal and Curb Ramps 04/30/20 6.00 15.00 56.33 115.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 30.00 10.00 16.42 7.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 34.00 4.00 19.00 24.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 20.00 5.00 63.70 8.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 8,280.00 2.40 2.44 2.44 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 2,680.00 3.00 2.17 0.10 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 5,600.00 3.00 2.14 1.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 183 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00061 Mulch Tackifier Pound ================================================== NH050A-037 US 50A Pueblo Regional Pond ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 320.00 5.00 11.75 11.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 4.00 25.00 74.17 72.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 28,830.00 2.84 2.33 2.06 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 51.00 12.00 13.00 13.00 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 68.00 5.00 28.11 4.50 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 279.00 4.00 3.75 3.45 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 54.00 3.50 6.63 5.00 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 155.00 4.00 5.00 5.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 160.00 2.50 3.50 4.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 20.00 7.00 15.22 24.00 STR184B-006 CULVERTS SH 184 08/06/20 64.00 20.00 8.00 8.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 460.00 7.87 2.54 2.70 STM094A-038 SH94 WB PASSING LANE 09/01/20 700.00 1.79 1.79 1.79 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 4,200.00 5.00 2.74 3.65 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 2,300.00 2.50 2.36 2.25 SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 50.00 10.00 260.00 500.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 5,280.00 1.68 2.44 2.44 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 13,841.00 3.30 3.35 4.73 MPC040-061 R2 FY 21 Sign Replacement 10/01/20 50.00 7.31 11.00 10.00 MTCE0253-271 FY20 I-25 SIGN REPL PHASE 1 10/08/20 20.00 2.75 43.17 45.00 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 10.00 5.00 52.33 60.00 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 4,220.00 2.50 3.94 3.32 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 13,020.00 3.00 2.42 1.50 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 200.00 6.00 4.00 4.50 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 170.00 13.00 14.63 1.25 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 4.00 3.00 325.00 100.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 23,370.00 2.11 2.26 2.26 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 41,064.00 2.50 2.66 2.19 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 127,969.00 3.26 2.78 2.51 =============== 213-00067 Rock Mulch (Weed Free) Sq Foot ================================================ STRR300-249 Grand and Jackson Counties AD 03/05/20 363.00 15.00 15.33 25.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 184 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00067 Rock Mulch (Weed Free) Sq Foot ================================================ CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 37.00 15.00 20.23 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 400.00 15.00 15.92 24.54 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 239.00 25.00 10.83 10.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 200.00 20.00 15.43 10.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 200.00 30.00 20.65 10.06 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 639.00 25.00 16.09 10.02 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 550.00 20.00 15.72 2.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 550.00 20.00 15.72 2.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,589.00 20.75 15.95 10.95 =============== 213-00070 Landscape Weed Barr Fabric Sq Yard ================================================ C1601-082 Hawkins Signal and Curb Ramps 04/30/20 2.00 20.00 162.33 330.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 20.00 162.33 330.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 200.00 3.00 8.86 7.50 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 200.00 5.00 9.43 7.54 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 4,116.00 2.18 2.15 2.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,516.00 2.34 4.58 2.63 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,518.00 2.35 4.73 2.77 =============== 213-00150 Bonded Fiber Matrix Acre =================================================== PWQM240-172 El Paso County, north Colorad 01/23/20 5.00 3300.00 3450.00 3400.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 1.00 3000.00 4116.49 4141.14 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 5.80 3000.00 2460.00 2700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11.80 3127.12 3084.87 3118.74 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 185 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00150 Bonded Fiber Matrix Acre =================================================== STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 1.50 3500.00 3937.33 2500.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 27.50 3100.00 2533.85 2409.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 1.50 3200.00 2922.46 3000.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 10.00 3700.00 3754.12 3754.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 40.50 3266.67 2629.68 2766.39 STM094A-038 SH94 WB PASSING LANE 09/01/20 5.00 2740.52 2740.52 2740.52 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 8.00 2800.00 3311.31 4170.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 10.00 3411.07 3754.12 3754.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 23.00 3052.75 3336.30 3678.43 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 5.00 2919.64 2919.64 2919.64 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 20.00 2930.00 2471.67 2690.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 50.00 2010.31 2151.03 2151.03 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 75.00 2316.18 2392.86 2346.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 150.30 2748.68 2665.67 2723.84 =============== 213-00470 Landscape Border (1/4x5 In) Lin Foot =============================================== C R100-288 R1 CURB RAMPS - PH 2 09/03/20 150.00 7.00 11.28 6.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 150.00 7.00 11.28 6.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 150.00 7.00 11.28 6.50 =============== 213-00700 Landscape Boulder Each =================================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 55.00 500.00 185.00 290.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 55.00 500.00 185.00 290.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 55.00 500.00 185.00 290.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 186 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 214-00000 Landscape Maintenance LUMP SUM =============================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 1.00 25000.00 1906.67 1050.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1.00 17000.00 7896.00 8250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 21000.00 5650.00 4650.00 SFTY2254-091 225 Ramp Improvements 04/09/20 1.00 25000.00 5750.00 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 25000.00 5750.00 1500.00 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 1.00 5000.00 32999.50 31000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 5000.00 32999.50 31000.00 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 1.00 3000.00 9000.00 10600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 3000.00 9000.00 10600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 15000.00 12483.22 10480.00 =============== 214-00005 Landscape Maintenance (24 Month) LUMP SUM =============================================== NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 1.00 7500.00 22218.00 14590.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 7500.00 22218.00 14590.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 25000.00 31557.22 29150.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1.00 28400.00 28769.28 28769.28 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 26700.00 31247.45 28959.64 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1.00 10000.00 13047.83 7500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 10000.00 13047.83 7500.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 187 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 214-00005 Landscape Maintenance (24 Month) LUMP SUM =============================================== FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1.00 13903.35 13903.35 13903.35 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1.00 41237.11 84662.37 84662.37 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 27570.23 49282.86 49282.86 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 21006.74 25313.81 29762.50 =============== 214-00201 Deciduous Tree (Tubeling) Each =================================================== NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 5.00 100.00 107.00 107.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 100.00 107.00 107.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 100.00 107.00 107.00 =============== 214-00222 Decid Tree (2 In Cal) (Furnish) Each =================================================== SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1.00 400.00 1213.40 1375.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 400.00 1213.40 1375.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 7.00 500.00 803.51 990.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7.00 500.00 803.51 990.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 487.50 841.46 1038.13 =============== 214-00330 Deciduous Shrub (3 Gal) Each =================================================== NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 44.00 70.00 43.25 53.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 44.00 70.00 43.25 53.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 44.00 70.00 43.25 53.00 =============== 214-00504 Evergreen Tree (4 Ft)(B-B) Each =================================================== NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 12.00 700.00 680.57 608.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.00 700.00 680.57 608.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 700.00 680.57 608.20 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 188 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 214-01011 Live Brush Mattress Lin Foot =============================================== NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 225.00 67.01 71.70 71.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 225.00 67.01 71.70 71.70 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 225.00 67.01 71.70 71.70 =============== 214-01013 Live Willow Stakes Each =================================================== NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 475.00 8.00 5.00 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 475.00 8.00 5.00 5.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 475.00 8.00 5.00 5.00 =============== 214-01032 Large Woody Material Each =================================================== FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 1.00 2500.00 1790.63 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 2500.00 1790.63 500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2500.00 1790.63 500.00 =============== 214-01403 Nursery Stock Container (DRC # 60) Each =================================================== C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 25.00 50.00 74.75 69.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 25.00 50.00 74.75 69.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25.00 50.00 74.75 69.00 =============== 215-00700 Transplant Sod Sq Yard ================================================ NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 272.00 80.00 29.02 76.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 272.00 80.00 29.02 76.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 272.00 80.00 29.02 76.80 =============== 216-00021 Soil Reten Blanket (Cl 1) Sq Yard ================================================ STM094A-038 SH94 WB PASSING LANE 09/01/20 13,460.00 3.04 3.04 3.04 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 13,460.00 3.04 3.04 3.04 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 189 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 216-00021 Soil Reten Blanket (Cl 1) Sq Yard ================================================ FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 18,400.00 2.19 2.19 2.19 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 18,400.00 2.19 2.19 2.19 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 31,860.00 2.55 2.55 2.55 =============== 216-00041 Soil Reten Blanket (S/C) Sq Yard ================================================ CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 2,300.00 2.50 2.85 2.60 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,300.00 2.50 2.85 2.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,300.00 2.50 2.85 2.60 =============== 216-00070 Geocell Confinement Sys Sq Yard ================================================ CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 2,990.00 60.00 29.36 16.34 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,990.00 60.00 29.36 16.34 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 359.00 60.00 51.39 45.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 359.00 60.00 51.39 45.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,349.00 60.00 31.45 19.44 =============== 216-00101 Soil Reten Blanket (S-C)(PhotoD Cl 1) Sq Yard ================================================ FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 4,340.00 5.00 3.75 3.75 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 21,580.00 3.00 2.10 1.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 25,920.00 3.33 2.16 2.04 C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 968.00 4.00 4.80 4.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 968.00 4.00 4.80 4.25 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 190 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 216-00101 Soil Reten Blanket (S-C)(PhotoD Cl 1) Sq Yard ================================================ NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 340.00 4.00 6.00 6.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 4,226.00 3.00 3.93 3.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,566.00 3.07 3.95 4.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 31,454.00 3.32 2.59 2.41 =============== 216-00111 Soil Reten Blanket (Excel)(PhotoD Cl 1) Sq Yard ================================================ STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 2,250.00 3.00 5.00 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,250.00 3.00 5.00 5.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,250.00 3.00 5.00 5.00 =============== 216-00201 Soil Reten Blanket (S-C)(BioD Cl 1) Sq Yard ================================================ NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 100.00 11.00 60.50 96.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 14,470.00 2.40 4.38 5.00 STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 1,000.00 4.00 3.40 3.55 PWQM240-172 El Paso County, north Colorad 01/23/20 14,808.00 2.50 2.65 2.80 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 100.00 2.50 5.56 5.82 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 1,000.00 3.50 3.78 3.55 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 968.00 3.00 3.18 3.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 105.00 4.00 4.15 4.15 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 8,000.00 2.50 2.71 2.19 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 2,717.00 4.00 4.78 5.50 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 19,079.00 2.40 2.50 2.50 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1,813.00 3.00 3.40 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 64,160.00 2.59 2.99 3.43 IM0761-226 I76/SH52 Interchange 04/02/20 16,633.00 2.00 2.74 2.44 SFTY2254-091 225 Ramp Improvements 04/09/20 1,166.00 4.00 3.25 2.50 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 18,449.00 7.00 3.23 2.98 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 800.00 4.00 2.78 2.60 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 191 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 216-00201 Soil Reten Blanket (S-C)(BioD Cl 1) Sq Yard ================================================ ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 10,600.00 7.00 3.84 3.19 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 15,960.00 2.60 2.66 2.66 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 54,300.00 2.50 2.73 2.40 NH050A-037 US 50A Pueblo Regional Pond -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 117,908.00 3.58 2.89 2.60 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 485.00 3.50 5.49 6.00 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 778.00 2.00 3.54 2.21 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 463.00 5.00 4.25 4.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 1,047.00 5.00 3.75 3.50 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 2,000.00 3.50 3.00 3.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 1,560.00 3.78 3.38 3.60 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 100.00 2.34 3.25 3.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6,433.00 3.72 3.56 3.43 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 5,912.00 8.70 3.98 2.30 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 3,500.00 4.00 3.95 3.85 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 250.00 4.00 8.31 11.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 968.00 3.00 3.95 5.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 30,000.00 2.25 2.38 2.05 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 121,240.00 2.01 2.15 2.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 161,870.00 2.35 2.52 2.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 350,371.00 2.83 2.83 2.59 =============== 216-00211 Soil Reten Blanket (Exc)(BioD Cl 1) Sq Yard ================================================ ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 50.00 6.00 25.84 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 50.00 6.00 25.84 10.00 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 200.00 10.00 7.58 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 200.00 10.00 7.58 11.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 192 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 216-00211 Soil Reten Blanket (Exc)(BioD Cl 1) Sq Yard ================================================ ITS ITSB-003 ITS FIBER ON I-76 10/29/20 180.00 20.00 4.81 5.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 180.00 20.00 4.81 5.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 430.00 13.72 8.20 8.69 =============== 216-00221 Soil Reten Blanket (C)(BioD Cl 1) Sq Yard ================================================ FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 604.00 3.50 3.25 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 604.00 3.50 3.25 3.00 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 555.00 4.75 4.00 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 555.00 4.75 4.00 4.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,159.00 4.10 3.43 3.48 =============== 216-00301 Turf Reinf Mat (Cl 1) Sq Yard ================================================ NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 12,649.00 6.50 4.96 4.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12,649.00 6.50 4.96 4.65 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 424.00 8.00 6.50 5.25 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 440.00 7.00 6.80 6.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 864.00 7.49 6.74 5.96 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 400.00 4.75 4.75 4.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 400.00 4.75 4.75 4.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13,913.00 6.51 5.03 4.73 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 193 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 216-00302 Turf Reinf Mat (Cl 2) Sq Yard ================================================ NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 19,079.00 8.00 5.77 5.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 19,079.00 8.00 5.77 5.30 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 200.00 5.87 5.87 5.87 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 200.00 5.87 5.87 5.87 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19,279.00 7.98 5.77 5.31 =============== 216-00303 Turf Reinf Mat (Cl 3) Sq Yard ================================================ NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 113.00 10.00 7.63 8.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 113.00 10.00 7.63 8.50 STM094A-038 SH94 WB PASSING LANE 09/01/20 13,460.00 5.26 5.26 5.26 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 13,460.00 5.26 5.26 5.26 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 300.00 7.01 7.01 7.01 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 300.00 7.01 7.01 7.01 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13,873.00 5.34 5.35 5.32 =============== 217-00000 Herbicide Treatment Sq Yard ================================================ FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 3,000.00 3.50 0.57 0.55 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 5,982.00 0.42 0.35 0.30 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 200.00 10.00 5.63 5.25 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 500.00 120.00 3.17 1.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9,682.00 7.75 0.84 0.56 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 194 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 217-00000 Herbicide Treatment Sq Yard ================================================ SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 199.00 6.00 3.83 6.63 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 199.00 6.00 3.83 6.63 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 10.00 160.00 53.64 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 160.00 53.64 50.00 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 200.00 200.00 7.92 1.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 100.00 2.00 1.83 1.70 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 4,200.00 2.00 0.70 0.40 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 5,000.00 2.00 0.35 0.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9,500.00 6.17 0.66 0.43 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19,391.00 7.03 0.83 0.58 =============== 217-00020 Herbicide Treatment Hour =================================================== PWQM240-172 El Paso County, north Colorad 01/23/20 8.00 200.00 246.00 202.00 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 20.00 150.00 163.42 80.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 8.00 125.00 214.20 165.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 36.00 155.56 184.91 126.00 IM0761-226 I76/SH52 Interchange 04/02/20 20.00 165.00 230.62 265.00 SFTY2254-091 225 Ramp Improvements 04/09/20 8.00 150.00 215.00 300.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 10.00 145.00 179.05 203.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 8.00 85.00 311.63 350.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 20.00 150.00 178.36 100.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 20.00 150.00 161.75 181.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 40.00 200.00 193.04 193.04 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 195 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 217-00020 Herbicide Treatment Hour =================================================== ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 20.00 125.00 192.04 0.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 146.00 158.42 202.81 177.25 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 40.00 171.43 214.00 214.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 40.00 171.43 214.00 214.00 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 10.00 175.00 184.75 159.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 8.00 145.00 142.50 180.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 50.00 203.57 203.57 203.57 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 200.00 204.12 218.41 218.41 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 268.00 201.17 207.62 212.28 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 490.00 182.65 202.08 195.64 =============== 218-00000 Noxious Weed Management LUMP SUM =============================================== NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1.00 5400.00 5350.00 5350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 5400.00 5350.00 5350.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 5000.00 5350.00 5350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 5000.00 5350.00 5350.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1.00 5505.15 5890.51 5890.51 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 5505.15 5890.51 5890.51 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 5301.72 5530.17 5530.17 =============== 240-00000 Wildlife Biologist Hour =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 4.00 100.00 82.74 77.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 196 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 240-00000 Wildlife Biologist Hour =================================================== SHER500-210 R5 FY19 CENTER LINE RUMBLE ST 01/09/20 20.00 120.00 1012.50 275.00 STR141A-044 SH 141 AND SH 145, FROM SLICK 01/30/20 20.00 100.00 150.61 80.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 80.00 110.00 87.50 100.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 20.00 130.00 147.75 130.00 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 20.00 150.00 103.50 95.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 20.00 150.00 125.00 125.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 40.00 130.00 126.67 110.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 8.00 100.00 163.00 220.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 232.00 121.55 180.94 123.14 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 15.00 120.00 145.73 121.28 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 20.00 130.00 126.67 130.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 40.00 150.00 154.56 90.00 SFTY2254-091 225 Ramp Improvements 04/09/20 16.00 25.00 128.00 101.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 80.00 100.00 105.62 82.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1601-082 Hawkins Signal and Curb Ramps 04/30/20 20.00 150.00 126.00 138.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 20.00 110.00 199.00 215.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 20.00 100.00 112.99 112.99 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 40.00 125.00 141.50 66.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 271.00 114.39 124.16 104.04 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 80.00 120.00 98.75 80.00 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 20.00 200.00 170.00 170.00 STR184B-006 CULVERTS SH 184 08/06/20 30.00 150.00 125.00 125.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 40.00 130.00 123.83 78.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 16.00 110.00 110.29 90.00 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 5.00 120.00 166.60 180.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 40.00 140.00 135.49 130.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 231.00 135.32 119.69 104.85 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 60.00 120.00 161.30 141.50 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 30.00 120.00 160.57 131.70 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 40.00 150.00 189.33 123.00 NHPP0702-407 PR I-70 Glenwood Springs Griz 11/03/20 5.00 170.00 376.19 275.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 40.00 125.00 162.67 120.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 197 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 240-00000 Wildlife Biologist Hour =================================================== NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 40.00 150.00 160.07 96.05 C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 20.00 170.00 158.95 160.00 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 8.00 200.00 134.75 159.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 80.00 150.00 97.50 90.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 12.00 800.00 146.20 150.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 40.00 125.00 136.39 88.00 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 40.00 100.00 101.39 114.75 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 100.00 115.71 115.71 115.71 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 16.00 130.00 225.33 264.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 40.00 72.17 77.22 77.22 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 571.00 141.48 149.58 118.82 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,305.00 131.22 140.43 114.04 =============== 240-00010 Rem of Nests Hour =================================================== BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 80.00 95.00 119.65 85.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 50.00 100.00 87.51 105.01 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 80.00 110.00 75.00 80.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 40.00 102.00 87.28 60.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 100.00 100.00 96.92 60.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 40.00 130.00 98.48 120.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 30.00 100.00 128.51 150.00 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 10.00 150.00 91.25 95.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 20.00 125.00 217.99 62.71 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 8.00 100.00 199.34 225.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 458.00 105.85 117.10 87.67 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 8.00 100.00 298.50 285.00 IM0761-226 I76/SH52 Interchange 04/02/20 20.00 100.00 176.57 115.39 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 20.00 140.00 117.67 130.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 80.00 100.00 124.49 82.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP IM025A-048 Northbound I-25 bridge at Exi 05/28/20 20.00 110.00 179.56 105.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 148.00 106.76 138.65 107.35 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 20.00 140.00 97.38 135.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 198 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 240-00010 Rem of Nests Hour =================================================== NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 10.00 140.00 130.00 130.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 52.00 105.00 145.14 100.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 16.00 123.16 140.20 1.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 40.00 100.00 123.00 74.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 25.00 75.00 140.88 180.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 40.00 219.72 242.89 242.89 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 203.00 129.53 140.27 130.01 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 100.00 185.00 119.33 123.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 40.00 130.00 113.40 96.05 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 8.00 100.00 129.75 159.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 80.00 106.00 89.00 83.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 12.00 150.00 104.95 70.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 40.00 75.00 136.39 88.00 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 16.00 120.00 114.38 150.19 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 40.00 120.00 97.55 114.75 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 100.00 109.29 109.29 109.29 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 40.00 100.00 148.28 304.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 80.00 150.00 238.74 238.74 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 556.00 128.47 126.16 139.56 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,365.00 118.68 128.33 117.24 =============== 240-00015 Protect Migratory Birds Hour =================================================== NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 50.00 100.00 53.51 105.01 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 50.00 100.00 53.51 105.01 SFTY2254-091 225 Ramp Improvements 04/09/20 16.00 80.00 128.00 101.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16.00 80.00 128.00 101.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 66.00 95.15 71.56 104.04 =============== 240-00017 Protect Migratory Birds LUMP SUM =============================================== SFTY2254-091 225 Ramp Improvements 04/09/20 1.00 5000.00 5690.00 8900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 5000.00 5690.00 8900.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5000.00 5690.00 8900.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 199 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 240-00020 Netting Sq Yard ================================================ BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 2,200.00 15.00 9.24 6.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 500.00 10.00 14.45 18.90 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 584.00 11.00 12.21 14.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 800.00 10.00 11.46 9.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 560.00 15.00 11.15 10.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 257.00 6.50 12.38 11.40 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1,000.00 10.00 9.88 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,901.00 12.29 10.14 9.92 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 200.00 6.00 30.17 31.57 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP IM025A-048 Northbound I-25 bridge at Exi 05/28/20 400.00 10.00 19.53 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 600.00 8.67 25.61 15.86 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 22.00 10.00 38.63 50.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 12,770.00 45.00 9.17 7.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 96.00 19.27 25.06 1.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 50.00 31.64 31.64 31.64 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 500.00 10.00 9.98 11.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 13,438.00 43.41 9.35 7.29 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 2,000.00 25.00 12.93 8.80 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 100.00 20.00 9.04 3.40 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 100.00 15.00 13.07 3.00 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 50.00 10.00 12.24 18.77 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 750.00 11.73 11.73 11.73 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 80.00 20.00 16.81 59.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,080.00 20.91 12.90 10.63 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 23,019.00 31.51 10.08 8.63 =============== 240-00100 Prairie Dog Mgmt LUMP SUM =============================================== SFTY2254-091 225 Ramp Improvements 04/09/20 1.00 1000.00 6750.00 8900.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 200 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 240-00100 Prairie Dog Mgmt LUMP SUM =============================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 20000.00 32069.11 24838.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 10500.00 27005.29 16869.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 10500.00 27005.29 16869.00 =============== 240-00200 Bat House Each =================================================== BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 2.00 500.00 742.89 350.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 500.00 742.89 350.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 2.00 2164.95 1158.25 1158.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 2164.95 1158.25 1158.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 1332.48 802.23 754.13 =============== 250-00010 Envir Health/Safety Mngmt LUMP SUM =============================================== NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 1.00 6000.00 3270.75 2845.00 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 1.00 12000.00 9140.44 15000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 9000.00 6205.60 8922.50 IM0761-226 I76/SH52 Interchange 04/02/20 1.00 10000.00 3082.35 2984.96 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 1.00 8000.00 9671.67 20000.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 1.00 5000.00 8233.33 3850.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1.00 3000.00 3204.65 3204.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 6500.00 5606.87 7509.90 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 1.00 10000.00 12300.00 17500.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 201 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 250-00010 Envir Health/Safety Mngmt LUMP SUM =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 2795.00 3088.66 3088.66 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 6397.50 9997.17 10294.33 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 1.00 6000.00 5786.67 7500.00 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 1.00 10000.00 8782.00 7915.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1.00 2680.41 2868.04 2868.04 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 6226.80 7126.45 6094.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 6861.40 6636.22 7886.94 =============== 250-00050 Monitoring Technician Hour =================================================== CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 40.00 140.00 137.83 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 40.00 140.00 137.83 40.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 40.00 200.00 127.33 150.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 80.00 170.00 173.33 161.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 120.00 180.00 158.00 157.33 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 40.00 150.00 106.67 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 40.00 150.00 106.67 110.00 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 40.00 125.00 108.33 40.00 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 16.00 135.00 179.00 210.00 FSA1211-098 SH 121 & 1ST AVE 11/19/20 40.00 140.00 112.33 116.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 96.00 132.92 127.50 100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 296.00 155.27 138.05 116.49 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 202 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 250-00100 Environmental Health and Safety LUMP SUM =============================================== FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 1.00 10000.00 8526.67 5790.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 1.00 1000.00 7060.50 5485.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 5500.00 7688.86 5637.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 5500.00 7688.86 5637.50 =============== 250-00110 Health and Safety Officer Hour =================================================== NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 10.00 120.00 155.53 125.00 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 40.00 120.00 158.01 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 50.00 120.00 157.51 57.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 40.00 200.00 135.00 150.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 20.00 150.00 210.33 264.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 60.00 183.33 160.11 188.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 40.00 150.00 81.67 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 40.00 150.00 81.67 35.00 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 40.00 125.00 111.67 40.00 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 16.00 90.00 204.20 250.00 FSA1211-098 SH 121 & 1ST AVE 11/19/20 16.00 150.00 122.33 130.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 20.00 285.00 158.00 81.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 92.00 158.04 145.58 101.09 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 242.00 155.12 142.20 102.60 =============== 250-00120 Material Sampling and Delivery Each =================================================== FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 10.00 350.00 407.00 306.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 350.00 407.00 306.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 350.00 407.00 306.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 203 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 250-00200 Material Handling (Stockpile) Cubic Yard ============================================= STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 200.00 25.00 17.08 3.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 20.00 200.00 223.00 314.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 220.00 40.91 35.80 31.27 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 2.00 50.00 196.00 175.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 50.00 196.00 175.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 222.00 40.99 38.19 32.57 =============== 250-00204 Materials Management Plan LUMP SUM =============================================== NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1.00 3000.00 1284.00 1284.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 3000.00 1284.00 1284.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 2500.00 3088.66 3088.66 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 2500.00 3088.66 3088.66 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 1.00 2700.00 13188.83 4000.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1.00 2680.41 2868.04 2868.04 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 2690.21 11714.43 3434.02 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 2720.10 9597.08 2810.18 =============== 250-00210 Solid Waste Disposal Cubic Yard ============================================= FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 20.00 250.00 237.00 336.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20.00 250.00 237.00 336.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 250.00 237.00 336.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 204 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 250-00220 Hazardous Waste Disposal Cubic Yard ============================================= NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 1.00 600.00 585.00 520.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 600.00 585.00 520.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 200.00 20.00 61.50 3.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 5.00 1000.00 676.33 709.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 205.00 43.90 76.50 20.22 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 2.00 50.00 214.60 155.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 50.00 214.60 155.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 208.00 46.63 81.93 23.92 =============== 304-01000 ABC (CL 1) Ton ==================================================== NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 63,910.00 18.00 20.76 15.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 63,910.00 18.00 20.76 15.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 63,910.00 18.00 20.76 15.60 =============== 304-01005 ABC (CL 1) Cubic Yard ============================================= NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 100.00 40.00 86.42 81.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 100.00 40.00 86.42 81.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 818.00 65.00 56.33 63.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 818.00 65.00 56.33 63.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 14.00 200.00 372.33 400.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 205 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-01005 ABC (CL 1) Cubic Yard ============================================= STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 2,550.00 50.00 44.01 49.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,564.00 50.82 45.08 50.92 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,482.00 53.84 47.66 54.62 =============== 304-02000 ABC (CL 2) Ton ==================================================== NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 157.00 35.00 47.00 47.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 157.00 35.00 47.00 47.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 20,077.00 24.00 26.95 22.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20,077.00 24.00 26.95 22.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20,234.00 24.09 26.97 22.99 =============== 304-02005 ABC (CL 2) Cubic Yard ============================================= STM094A-038 SH94 WB PASSING LANE 09/01/20 80.00 85.61 85.61 85.61 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 80.00 85.61 85.61 85.61 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 80.00 85.61 85.61 85.61 =============== 304-05000 ABC (CL 5) Ton ==================================================== NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 1,557.00 40.00 46.00 70.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,557.00 40.00 46.00 70.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,557.00 40.00 46.00 70.00 =============== 304-06000 ABC (CL 6) Ton ==================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 719.00 55.00 56.00 56.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 206 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-06000 ABC (CL 6) Ton ==================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 4,459.00 35.00 44.79 44.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 1,727.00 42.00 50.04 42.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 1,085.00 50.00 51.50 53.00 PWQM240-172 El Paso County, north Colorad 01/23/20 1,547.00 45.00 48.00 63.00 STR141A-044 SH 141 AND SH 145, FROM SLICK 01/30/20 5,318.00 25.00 29.55 24.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 120.00 80.00 80.50 79.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 69,190.00 22.00 27.58 28.73 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 5,145.00 50.00 38.50 32.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 148.00 60.00 58.00 58.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 70,563.00 24.00 23.00 17.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 687.00 70.00 64.40 47.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 160,708.00 25.29 25.59 24.85 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 1,228.92 38.00 38.25 41.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 6,269.00 25.00 34.59 34.17 SFTY2254-091 225 Ramp Improvements 04/09/20 1,947.00 50.00 67.50 59.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 596.41 35.00 55.99 45.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1601-082 Hawkins Signal and Curb Ramps 04/30/20 533.00 40.00 59.33 56.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 3,633.00 45.00 49.33 58.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 12,110.00 30.00 29.15 20.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 14.00 26.00 193.33 345.00 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 358.00 30.00 41.53 29.00 NH050A-037 US 50A Pueblo Regional Pond -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 26,689.33 33.00 34.14 33.88 FSAC010-124 US 40, US 287, SH 88 08/06/20 41.00 45.00 86.67 105.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 5,740.00 26.42 26.42 26.42 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 1,363.00 50.00 53.83 37.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 1,210.00 35.00 49.63 37.16 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 3,735.00 35.00 41.29 30.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 4,396.00 31.00 33.02 28.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 16,485.00 32.21 38.94 29.66 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 461.00 50.00 64.93 49.80 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 207 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-06000 ABC (CL 6) Ton ==================================================== SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 20.00 60.00 161.75 154.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 14.00 200.00 140.00 105.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 10,617.00 50.00 33.88 25.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 193.00 80.00 87.00 44.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 46,083.00 20.00 23.78 15.60 CR100-342 US-6 at Garrison 12/17/20 600.00 27.00 37.67 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 57,988.00 26.06 25.82 17.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 261,870.33 26.68 27.22 24.53 =============== 304-06007 ABC (CL 6) Cubic Yard ============================================= FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 389.00 50.00 74.68 70.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 493.00 75.00 109.00 134.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 309.00 70.00 101.67 92.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 619.00 60.00 85.00 75.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 774.00 55.00 58.20 64.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 1,266.00 45.00 55.45 40.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 11,490.00 50.00 63.53 55.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 230.00 45.00 58.97 55.34 STRR300-249 Grand and Jackson Counties AD 03/05/20 315.00 78.67 131.00 75.00 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 83.00 100.00 91.78 86.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 11,054.00 25.00 66.42 58.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1,867.00 45.00 99.15 65.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 28,889.00 41.30 69.25 59.07 IM0761-226 I76/SH52 Interchange 04/02/20 11,240.00 55.00 50.82 49.70 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 540.00 67.00 68.17 76.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 124.00 80.00 123.33 155.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 503.00 50.00 111.26 102.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 2,426.00 47.00 54.24 54.24 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 14,833.00 54.17 54.67 54.05 STMM086-083 ADA PUEBLO METRO 07/09/20 51.00 80.00 97.50 70.00 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 21.00 60.00 152.50 185.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 311.00 77.00 110.00 95.00 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 1,060.00 55.00 57.39 39.95 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 208 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-06007 ABC (CL 6) Cubic Yard ============================================= BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 192.00 60.00 131.57 90.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 340.00 80.00 35.00 50.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 862.00 66.61 77.68 71.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 154.00 36.00 70.21 75.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 6,486.00 50.00 52.93 45.30 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1,751.00 54.50 59.90 59.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 11,228.00 54.24 59.18 52.11 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 874.00 75.00 59.00 35.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 12.00 100.00 455.00 500.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 440.00 65.00 60.91 60.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 2,004.00 54.60 54.60 54.60 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 74.00 36.00 243.93 50.60 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 73,896.00 32.73 37.54 37.54 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 77,300.00 33.97 40.60 38.17 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 132,250.00 39.56 55.36 45.70 =============== 304-06008 ABC (CL 6) (Spec) Cubic Yard ============================================= IM0761-226 I76/SH52 Interchange 04/02/20 270.00 65.00 95.54 71.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 270.00 65.00 95.54 71.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 270.00 65.00 95.54 71.00 =============== 304-07000 ABC (CL 7) Ton ==================================================== STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 12,248.40 30.00 32.00 24.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12,248.40 30.00 32.00 24.00 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 3,756.00 40.00 44.33 39.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 55.97 50.00 222.92 156.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,811.97 40.15 48.66 40.72 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16,060.37 32.41 37.34 27.97 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 209 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-07005 ABC (CL 7) Cubic Yard ============================================= NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 654.00 90.00 87.47 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 654.00 90.00 87.47 80.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 654.00 90.00 87.47 80.00 =============== 304-07009 ABC (CL 7) (Spec) Ton ==================================================== STA0142-066 SH 14 New Raymer West 01/09/20 8,284.00 22.50 21.25 22.00 STA006A-067 SH 6 Merino to Atwood 01/16/20 2,879.00 22.50 28.38 23.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11,163.00 22.50 22.31 22.39 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,163.00 22.50 22.31 22.39 =============== 304-07010 ABC (CL 7) (Spec) Cubic Yard ============================================= FSA2873-194 US 287 Longmont Intersection 02/13/20 61.00 45.00 117.67 92.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 61.00 45.00 117.67 92.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 61.00 45.00 117.67 92.00 =============== 304-08000 ABC (Shoulder Material) Ton ==================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 1,423.00 30.00 41.67 31.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,423.00 30.00 41.67 31.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 385.00 54.22 54.22 54.22 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 385.00 54.22 54.22 54.22 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 2,564.00 30.00 31.09 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,564.00 30.00 31.09 13.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,372.00 32.13 35.47 22.49 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 210 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-08002 ABC (Shoulder Material) Cubic Yard ============================================= STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 3,952.00 50.00 72.45 80.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 5,958.00 45.00 31.88 24.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 613.00 45.00 99.28 95.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10,523.00 46.88 51.04 49.17 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 1,504.00 50.00 75.87 90.30 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 98.00 300.00 382.66 382.66 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,602.00 65.29 80.79 108.18 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 85.00 236.34 435.25 435.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 85.00 236.34 435.25 435.25 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 1,200.00 20.00 82.84 69.57 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 982.00 196.38 199.31 199.31 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,182.00 99.38 107.80 127.96 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14,392.00 58.01 62.25 69.96 =============== 304-09000 ABC (Spec) Cubic Yard ============================================= C1601-082 Hawkins Signal and Curb Ramps 04/30/20 1.00 70.00 690.00 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 70.00 690.00 1100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 70.00 690.00 1100.00 =============== 304-09014 ABC (Spec) Ton ==================================================== STR141A-044 SH 141 AND SH 145, FROM SLICK 01/30/20 13,038.00 27.00 31.78 26.75 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 211 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-09014 ABC (Spec) Ton ==================================================== NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 17,797.00 25.00 25.74 21.67 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 2,079.00 84200.00 45.00 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 32,914.00 5342.67 29.33 25.16 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 4,043.00 40.00 38.57 40.22 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 201.00 45.00 65.00 54.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4,244.00 40.24 39.82 40.87 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 3,171.00 34.00 32.20 23.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,171.00 34.00 32.20 23.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40,329.00 4367.26 30.60 26.65 =============== 304-09100 ABC (RAP) Ton ==================================================== NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1,777.00 10.00 22.08 22.08 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,777.00 10.00 22.08 22.08 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 63.00 7.46 51.69 51.69 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 63.00 7.46 51.69 51.69 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,840.00 9.91 23.09 23.09 =============== 304-09102 ABC (RAP) Cubic Yard ============================================= NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 936.57 20.61 29.25 29.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 936.57 20.61 29.25 29.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 936.57 20.61 29.25 29.25 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 212 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 306-01000 Reconditioning Sq Yard ================================================ BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 966.00 10.00 15.50 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 966.00 10.00 15.50 7.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 966.00 10.00 15.50 7.00 =============== 310-00608 Full Depth Reclam. of HMA Pvmt (0-8 in.) Sq Yard ================================================ IM0761-226 I76/SH52 Interchange 04/02/20 10,341.00 4.50 3.43 3.50 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 7,967.00 3.00 5.55 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 18,308.00 3.85 3.95 3.72 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18,308.00 3.85 3.95 3.72 =============== 310-00610 Full Depth Reclam. of HMA Pvmt (8-12 in) Sq Yard ================================================ STR141A-044 SH 141 AND SH 145, FROM SLICK 01/30/20 53,310.00 2.50 3.52 2.10 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 40,950.00 3.00 4.45 4.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 94,260.00 2.72 3.81 3.27 IM0761-226 I76/SH52 Interchange 04/02/20 5,170.00 6.00 4.44 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,170.00 6.00 4.44 5.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 75,663.00 1.00 2.25 2.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 75,663.00 1.00 2.25 2.90 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 175,093.00 2.07 3.03 3.16 =============== 310-00614 Full Depth Reclam of HMA Pvmt (12-16 in) Sq Yard ================================================ IM0761-226 I76/SH52 Interchange 04/02/20 3,103.00 7.00 6.41 8.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,103.00 7.00 6.41 8.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,103.00 7.00 6.41 8.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 213 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-00720 HMA (Patching) (Asph) Ton ==================================================== STA0142-066 SH 14 New Raymer West 01/09/20 400.00 180.00 210.63 188.50 FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 21.00 150.00 380.14 480.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 161.00 220.00 210.00 210.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 2,343.00 165.00 181.20 220.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 167.00 335.00 333.64 330.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STA006A-067 SH 6 Merino to Atwood 01/16/20 600.00 180.00 158.26 175.00 STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 50.00 200.00 253.50 207.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 481.00 120.00 149.56 159.11 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 50.00 130.00 252.50 300.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 132.00 300.00 382.26 339.51 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 1,294.00 185.00 193.00 176.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 100.00 200.00 161.59 150.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 500.00 175.00 145.76 128.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 2,499.00 125.00 144.42 108.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 500.00 135.00 186.50 150.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 40.00 300.00 260.00 260.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 10.00 150.00 552.67 642.79 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 22.00 300.00 463.33 540.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 500.00 175.00 183.08 170.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 163.00 200.00 246.70 196.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 184.00 300.00 196.40 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10,217.00 166.11 182.45 172.35 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 337.00 220.00 208.43 248.18 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 693.00 175.00 203.50 200.00 IM0761-226 I76/SH52 Interchange 04/02/20 212.00 220.00 164.24 145.75 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 320.00 150.00 164.72 164.44 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 155.40 130.00 179.55 110.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 25.00 190.00 225.50 398.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 100.00 250.00 334.50 203.50 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 1,540.00 120.00 260.33 263.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 700.00 180.00 139.89 140.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 20.00 250.00 336.67 405.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 48.00 335.00 362.03 360.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 10.00 230.00 404.33 395.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 30.00 200.00 226.97 226.97 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 15.10 500.00 435.80 346.49 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4,205.50 163.53 199.98 213.42 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 20.00 180.00 355.75 500.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 214 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-00720 HMA (Patching) (Asph) Ton ==================================================== STMM086-083 ADA PUEBLO METRO 07/09/20 295.00 150.00 412.50 325.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 309.00 200.00 177.50 180.00 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 55.00 200.00 176.80 150.00 IM0252-498 I-25 Maintenance Region 2 Pue 08/19/20 600.00 156.52 156.52 156.52 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 8.00 369.91 280.98 270.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 380.00 147.66 147.66 147.66 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 507.00 300.00 304.83 310.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 498.00 275.00 259.86 84.29 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 40.00 200.00 223.43 140.00 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 165.00 150.00 468.17 290.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 300.00 150.00 229.51 235.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 136.00 240.00 262.69 213.80 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 10.00 250.00 540.33 747.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 533.00 152.69 163.38 163.38 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,856.00 196.31 269.75 199.34 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 101.00 350.00 362.00 331.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 82.00 200.00 468.33 400.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 10.00 120.00 443.00 513.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 150.00 200.00 327.60 260.00 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 422.00 140.00 173.14 180.22 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 500.00 200.00 189.69 187.95 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 644.00 250.00 332.50 215.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 138.00 226.01 226.01 226.01 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 500.00 225.00 216.33 176.00 CR100-342 US-6 at Garrison 12/17/20 250.00 225.00 228.33 100.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 2,124.30 198.21 221.99 221.99 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,921.30 208.08 239.78 210.23 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 23,199.80 179.56 211.30 192.32 =============== 403-00721 HMA (Patching) (Asph) Sq Yard ================================================ FSA2873-194 US 287 Longmont Intersection 02/13/20 20.00 250.00 275.83 285.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 157.00 75.00 204.50 268.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 100.00 100.00 123.03 79.08 NHPP0502-082 US 50 MONTROSE RE CHIP SEAL 03/05/20 100.00 250.00 162.50 200.00 STRR300-249 Grand and Jackson Counties AD 03/05/20 737.00 75.00 144.67 141.00 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 11.00 150.00 130.88 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,125.00 96.62 154.87 160.82 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 215 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-00721 HMA (Patching) (Asph) Sq Yard ================================================ NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 100.00 165.00 136.54 162.22 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 1,540.00 50.00 32.13 31.40 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 500.00 100.00 99.25 149.00 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 396.00 175.00 157.50 65.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 28.00 450.00 290.00 305.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,564.00 87.91 62.82 67.61 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 25.00 300.00 195.76 150.00 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 36.00 175.00 153.33 180.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 45.00 300.00 228.00 250.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 75.00 150.00 101.67 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 181.00 212.98 161.13 126.96 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 1,881.00 125.00 181.00 40.00 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 7,352.00 50.00 70.93 87.80 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 50.00 200.00 176.00 130.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 630.00 200.00 106.23 119.50 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 289.00 100.00 287.50 425.00 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 8,865.00 87.00 32.04 14.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 19,067.00 80.71 67.32 55.16 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 22,937.00 83.34 71.77 62.30 =============== 403-00800 Emerg Pothole Rep Ton ==================================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 30.00 400.00 280.79 143.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 30.00 400.00 280.79 143.00 IM0252-498 I-25 Maintenance Region 2 Pue 08/19/20 90.00 268.51 268.51 268.51 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 90.00 268.51 268.51 268.51 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 216 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-00800 Emerg Pothole Rep Ton ==================================================== NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 50.00 500.00 550.14 568.03 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 50.00 500.00 550.14 568.03 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 170.00 359.80 362.66 334.46 =============== 403-05000 HMA (RCI) Ton ==================================================== STA0142-066 SH 14 New Raymer West 01/09/20 11,208.00 183.00 185.00 170.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11,208.00 183.00 185.00 170.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,208.00 183.00 185.00 170.00 =============== 403-09210 SMA Ton ==================================================== FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1,616.00 137.55 137.55 137.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,616.00 137.55 137.55 137.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,616.00 137.55 137.55 137.55 =============== 403-09221 SMA (Fibers)(Asph) Ton ==================================================== STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 16,176.00 140.00 146.10 132.24 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 287.00 250.00 230.60 281.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16,463.00 141.92 149.68 134.83 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16,463.00 141.92 149.68 134.83 =============== 403-09500 Furnish HMA Ton ==================================================== IM0252-498 I-25 Maintenance Region 2 Pue 08/19/20 90.00 114.04 114.04 114.04 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 90.00 114.04 114.04 114.04 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 90.00 114.04 114.04 114.04 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 217 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-33721 HMA (Gr S) (75) (PG 58-28) Ton ==================================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 45,523.00 85.00 87.85 80.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 45,523.00 85.00 87.85 80.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 45,523.00 85.00 87.85 80.50 =============== 403-33731 HMA (Gr S) (75) (PG 58-34) Ton ==================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 239.00 140.00 175.00 175.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 239.00 140.00 175.00 175.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 239.00 140.00 175.00 175.00 =============== 403-33841 HMA (Gr S) (100) (PG 64-22) Ton ==================================================== SHE 0703-461 I-70 and Kipling North Phase 03/26/20 193.00 200.00 146.80 114.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 193.00 200.00 146.80 114.00 IM0761-226 I76/SH52 Interchange 04/02/20 618.00 123.00 108.21 122.96 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 667.14 100.00 101.84 88.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,285.14 111.06 104.69 104.81 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 268.00 110.00 164.00 183.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1,738.00 110.00 92.71 78.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,006.00 110.00 95.72 92.03 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 4,142.00 105.00 105.00 105.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,142.00 105.00 105.00 105.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,626.14 109.74 102.07 101.78 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 218 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-34701 HMA (Gr SX) (75) Ton ==================================================== STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 5,205.00 72.00 85.90 76.80 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 22,811.00 70.00 53.25 49.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 18,248.00 85.00 121.67 130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 46,264.00 76.14 90.13 84.08 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 22,842.57 55.00 73.10 55.50 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 4,036.00 80.00 81.23 75.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 35,472.00 60.00 67.83 65.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 62,350.57 59.46 69.85 62.68 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 48,244.00 80.00 84.25 75.50 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 19,048.00 110.00 101.33 82.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 18,895.00 110.00 97.68 91.75 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 37,286.00 57.46 81.97 67.21 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 593.54 120.00 137.46 112.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 44,435.00 55.00 65.77 75.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 168,501.54 75.31 79.41 76.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 277,116.11 71.89 78.71 74.50 =============== 403-34721 HMA (Gr SX) (75) (PG 58-28) Ton ==================================================== NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 37,383.00 80.00 82.82 88.64 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 43,041.00 95.00 93.33 89.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 21,860.70 80.00 87.50 86.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 33,015.00 85.00 84.62 79.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 24,478.00 75.00 80.77 62.30 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 17,480.00 1821625.00 103.00 103.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 345.00 85.00 193.10 187.72 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 177,602.70 179363.85 87.84 84.59 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 3,152.00 95.00 133.61 112.22 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,152.00 95.00 133.61 112.22 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 219 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-34721 HMA (Gr SX) (75) (PG 58-28) Ton ==================================================== STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 13.90 100.00 570.00 350.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 228.00 110.00 239.86 200.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 1,579.00 120.00 151.68 180.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 2,445.00 89.71 89.71 89.71 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 4,917.00 100.00 147.55 153.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 9,333.00 124.00 118.29 116.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 18,515.90 112.57 131.04 129.05 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 18,522.00 100.00 86.65 75.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 18,522.00 100.00 86.65 75.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 217,792.60 146284.77 96.06 87.99 =============== 403-34731 HMA (Gr SX) (75) (PG 58-34) Ton ==================================================== NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 87,233.00 82.00 88.92 83.27 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 87,233.00 82.00 88.92 83.27 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 21,004.00 109.00 110.21 109.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 21,004.00 109.00 110.21 109.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 108,237.00 87.24 93.05 88.26 =============== 403-34741 HMA (Gr SX) (75) (PG 64-22) Ton ==================================================== STR141A-044 SH 141 AND SH 145, FROM SLICK 01/30/20 78,571.00 78.00 88.96 76.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 78,571.00 78.00 88.96 76.50 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 4,251.00 97.00 95.38 90.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 220 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-34741 HMA (Gr SX) (75) (PG 64-22) Ton ==================================================== NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 65.16 200.00 303.67 350.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 3,517.00 92.00 92.95 92.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7,833.16 95.61 96.23 93.49 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 2,271.00 92.14 98.59 98.59 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,271.00 92.14 98.59 98.59 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 72,823.00 76.73 82.10 82.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 72,823.00 76.73 82.10 82.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 161,498.16 78.48 88.56 80.16 =============== 403-34751 HMA (Gr SX) (75) (PG 64-28) Ton ==================================================== STA0142-066 SH 14 New Raymer West 01/09/20 25,496.00 83.00 93.40 88.60 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 52,375.00 82.00 110.58 97.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 1,734.00 160.00 151.32 136.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STA006A-067 SH 6 Merino to Atwood 01/16/20 32,095.00 84.50 106.48 88.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 86,105.00 84.00 99.13 98.25 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 20,982.00 80.00 100.39 91.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 218,787.00 83.70 102.75 94.97 C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 171.00 95.00 169.45 205.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 3,358.00 115.00 99.73 93.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 1,627.00 160.00 154.76 142.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1,115.00 95.00 96.19 96.19 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6,271.00 122.57 119.15 109.33 STM094A-038 SH94 WB PASSING LANE 09/01/20 1,088.00 105.92 105.92 105.92 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 221 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-34751 HMA (Gr SX) (75) (PG 64-28) Ton ==================================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 693.00 95.30 101.97 101.97 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,781.00 101.79 104.38 104.38 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 13,328.00 120.00 97.44 88.46 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 8,969.00 85.66 91.66 91.66 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 22,297.00 106.19 96.38 89.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 249,136.00 86.82 103.27 94.94 =============== 403-34801 HMA (Gr SX) (100) Ton ==================================================== HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 665.00 150.00 114.83 84.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 665.00 150.00 114.83 84.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 665.00 150.00 114.83 84.00 =============== 403-34841 HMA (Gr SX) (100) (PG 64-22) Ton ==================================================== MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 3,736.00 110.00 72.50 65.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,736.00 110.00 72.50 65.50 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 559.00 120.75 120.75 120.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 559.00 120.75 120.75 120.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,295.00 111.40 73.90 72.69 =============== 403-34851 HMA (Gr SX) (100) (PG 64-28) Ton ==================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 36,086.00 90.00 108.94 97.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 36,086.00 90.00 108.94 97.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 222 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-34851 HMA (Gr SX) (100) (PG 64-28) Ton ==================================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 2,032.26 136.89 146.47 146.47 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,032.26 136.89 146.47 146.47 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 38,118.26 92.50 109.63 99.64 =============== 403-34871 HMA (Gr SX) (100) (PG 76-28) Ton ==================================================== NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 1,008.00 200.00 123.50 140.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 31,730.00 80.00 93.75 80.25 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 56.00 200.00 219.80 235.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 32,794.00 83.89 94.73 82.35 IM0761-226 I76/SH52 Interchange 04/02/20 1,251.00 150.00 132.46 137.48 SFTY2254-091 225 Ramp Improvements 04/09/20 185.00 175.00 240.00 180.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 251.00 110.00 153.08 143.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,687.00 146.79 139.75 142.96 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 339.00 175.00 273.50 372.00 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 1,716.00 115.00 85.92 80.60 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1,345.00 100.00 110.86 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,400.00 115.05 105.30 113.37 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 263.00 119.39 127.75 127.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 263.00 119.39 127.75 127.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 38,144.00 89.70 100.27 88.11 =============== 403-36621 HMA (Gr ST)(50)(PG 58-28) Ton ==================================================== STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 30,279.00 109.00 98.00 96.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 223 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-36621 HMA (Gr ST)(50)(PG 58-28) Ton ==================================================== STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 12,473.20 85.00 99.50 93.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 20,768.00 85.00 88.33 85.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 63,520.20 96.44 94.83 91.81 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 63,520.20 96.44 94.83 91.81 =============== 403-36701 HMA (Gr ST)(75) Ton ==================================================== C0641-106 SH 64 Meeker West Rural Resur 03/05/20 16,390.00 72.00 60.05 53.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16,390.00 72.00 60.05 53.00 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 13,933.50 70.00 85.75 63.50 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 23,733.00 65.00 72.71 70.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 37,666.50 66.85 75.67 67.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 54,056.50 68.41 72.38 63.30 =============== 403-36721 HMA (Gr ST)(75)(PG 58-28) Ton ==================================================== STR141A-044 SH 141 AND SH 145, FROM SLICK 01/30/20 23,663.00 85.00 105.47 86.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 9,865.00 811155.00 105.00 105.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 33,528.00 238727.49 105.44 91.59 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 15,009.00 110.00 113.93 108.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 15,009.00 110.00 113.93 108.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 48,537.00 164940.28 107.64 96.82 =============== 405-00100 Heating and Remixing Treatment Sq Yard ================================================ NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 673,117.00 4.20 3.58 3.23 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 673,117.00 4.20 3.58 3.23 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 673,117.00 4.20 3.58 3.23 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 224 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 408-01000 Hot Joint-Crack Sealant Ton ==================================================== NHPP0502-082 US 50 MONTROSE RE CHIP SEAL 03/05/20 45.00 4000.00 5275.00 3600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 45.00 4000.00 5275.00 3600.00 STA141A-051 This will be a chipseal proje 12/17/20 5.40 5000.00 6264.60 5515.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.40 5000.00 6264.60 5515.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.40 4107.14 5404.08 3805.18 =============== 408-01100 Joint Sealant Lin Foot =============================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 3,206.00 13.00 26.76 27.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 386.00 20.00 19.02 25.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 241.00 25.00 20.00 25.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 429.00 28.00 30.50 28.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,262.00 15.82 25.41 26.81 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 192.00 25.00 31.32 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 192.00 25.00 31.32 11.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 88.00 20.00 41.57 25.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1,745.64 10.00 19.05 19.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,833.64 10.48 24.92 19.34 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 124.00 15.00 17.92 17.92 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 124.00 15.00 17.92 17.92 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,411.64 14.55 25.87 24.02 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 225 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 409-01015 CC Matl (Ty I) Sq Yard ================================================ NHPP0502-082 US 50 MONTROSE RE CHIP SEAL 03/05/20 1,107,884.00 0.88 1.31 0.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,107,884.00 0.88 1.31 0.85 NHPP1601-077 US 160 MP 29.750 - MP 34.891 04/09/20 130,383.00 1.10 0.93 0.75 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 191,375.00 1.25 1.37 1.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 321,758.00 1.19 1.19 1.02 STA141A-051 This will be a chipseal proje 12/17/20 894,371.00 0.88 1.20 0.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 894,371.00 0.88 1.20 0.95 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,324,013.00 0.92 1.25 0.91 =============== 409-02015 CC Matl (Ty II) Sq Yard ================================================ NHPP1601-077 US 160 MP 29.750 - MP 34.891 04/09/20 130,383.00 1.25 0.97 0.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 130,383.00 1.25 0.97 0.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 130,383.00 1.25 0.97 0.75 =============== 409-06000 Surfacing (macro style) Sq Yard ================================================ NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 249,989.00 0.60 0.61 0.61 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 249,989.00 0.60 0.61 0.61 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 249,989.00 0.60 0.61 0.61 =============== 409-09000 Micro-Surfacing Seal Coat Ton ==================================================== NHPP1601-077 US 160 MP 29.750 - MP 34.891 04/09/20 2,054.00 350.00 241.67 210.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,054.00 350.00 241.67 210.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,054.00 350.00 241.67 210.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 226 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 411-03342 Asph Cem (PG 64-28) Ton ==================================================== STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 2,228.00 600.00 426.89 450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,228.00 600.00 426.89 450.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,228.00 600.00 426.89 450.00 =============== 411-03352 Asph Cem (PG 58-28) Ton ==================================================== C0641-106 SH 64 Meeker West Rural Resur 03/05/20 1,108.00 550.00 360.00 300.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 710.00 600.00 533.33 580.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,818.00 569.53 444.95 409.35 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 982.27 500.00 427.50 410.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 1,403.00 450.00 424.92 405.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,385.27 470.59 425.59 407.06 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 2,725.00 500.00 373.33 385.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 1,143.00 550.00 404.33 315.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 1,178.00 500.00 373.05 300.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 35.61 550.00 676.08 600.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 1,752.00 400.00 418.00 410.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6,833.61 482.99 397.68 366.17 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,036.88 494.56 408.72 382.12 =============== 411-03354 Asph Cem (PG 64-22) Ton ==================================================== HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 41.00 550.00 554.55 645.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 41.00 550.00 554.55 645.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 244.00 325.00 472.83 475.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 244.00 325.00 472.83 475.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 285.00 357.37 481.07 499.46 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 227 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 411-03355 Asph Cem (PG 58-34) Ton ==================================================== STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 312.00 700.00 512.50 625.00 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 1,371.00 650.00 460.00 400.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 383.00 700.00 636.67 690.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,066.00 666.82 512.21 487.74 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 1,337.26 440.00 507.50 500.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 1,937.00 550.00 508.32 485.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,274.26 505.07 508.11 491.13 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 910.00 450.00 485.50 593.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 910.00 450.00 485.50 593.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,250.26 550.52 502.97 504.84 =============== 411-10216 Emul Asph (CRS-2P) Gallon ================================================= NHPP0502-082 US 50 MONTROSE RE CHIP SEAL 03/05/20 432,075.00 2.25 2.63 2.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 432,075.00 2.25 2.63 2.05 NHPP1601-077 US 160 MP 29.750 - MP 34.891 04/09/20 86,053.00 2.50 3.29 3.75 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 69,263.00 2.75 2.40 1.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 155,316.00 2.61 2.89 2.84 STA141A-051 This will be a chipseal proje 12/17/20 348,805.00 2.25 2.34 2.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 348,805.00 2.25 2.34 2.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 936,196.00 2.31 2.53 2.22 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 228 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 411-10253 Emul Asph (CSS-1H) Gallon ================================================= NHPP0502-082 US 50 MONTROSE RE CHIP SEAL 03/05/20 121,867.24 2.25 2.13 1.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 121,867.24 2.25 2.13 1.35 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 19,536.00 3.50 1.57 0.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 19,536.00 3.50 1.57 0.80 STA141A-051 This will be a chipseal proje 12/17/20 59,028.00 2.25 2.60 2.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 59,028.00 2.25 2.60 2.05 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 200,431.24 2.37 2.25 1.50 =============== 411-10255 Emul Asph (SS) Gallon ================================================= SHER500-210 R5 FY19 CENTER LINE RUMBLE ST 01/09/20 6,077.00 3.00 12.88 17.50 STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 3,112.00 2.75 2.75 3.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 24,679.00 3.00 1.95 3.40 STR141A-044 SH 141 AND SH 145, FROM SLICK 01/30/20 56,560.00 3.50 3.25 3.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 4,851.00 5.00 7.49 3.48 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 41,988.00 2.80 1.45 1.90 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 48,362.00 4.00 2.38 3.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 21,601.00 3.00 3.50 4.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 35,946.00 4.00 2.07 3.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 11,694.00 3.50 4.76 4.70 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 34,770.00 4.00 3.42 2.50 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 18,854.00 3.00 4.00 5.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 10,016.00 24606.00 4.50 4.50 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 105.00 4.00 17.86 19.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 13,667.00 7.00 5.42 5.50 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 19,408.00 3.50 8.08 3.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 100.00 6.00 8.30 4.50 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 111.00 4.00 7.40 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 351,901.00 703.89 3.84 3.48 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 23,741.00 3.00 3.08 2.17 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 229 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 411-10255 Emul Asph (SS) Gallon ================================================= STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 26,216.00 4.00 2.50 2.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 1,892.00 4.10 3.62 3.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 77,645.00 3.00 2.55 2.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1,105.00 4.50 3.24 3.30 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 155.00 4.00 22.05 4.50 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 391.00 7.00 5.00 5.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 2,247.00 5.00 3.57 3.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 133,392.00 3.27 2.71 2.09 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 9.00 6.00 21.50 25.00 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 3,715.00 4.00 4.25 5.85 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 953.00 6.95 6.50 11.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 1,885.00 2.71 2.71 2.71 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1,051.00 5.00 6.50 6.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 1,161.00 5.00 5.79 5.85 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 4,145.00 4.00 3.24 2.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12,919.00 4.20 4.42 4.80 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 21,554.00 6.00 3.18 2.05 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 8,256.00 5.50 3.17 3.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 13,406.00 5.50 4.49 5.50 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 18,673.00 4.00 2.79 3.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 270.00 6.00 5.67 4.25 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 11,025.00 3.00 5.30 4.79 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 7,483.00 4.50 4.24 5.75 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1,769.00 4.20 4.20 4.20 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 15,225.00 2.50 2.61 3.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 97,661.00 4.47 3.35 3.69 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 595,873.00 417.25 3.51 3.23 =============== 411-90010 Asph Rejuvenating Agent Gallon ================================================= NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 29,526.00 3.50 2.76 3.03 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 29,526.00 3.50 2.76 3.03 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 29,526.00 3.50 2.76 3.03 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 230 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 412-00000 Furn Conc Pvmt Cubic Yard ============================================= NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1,833.00 122.47 130.36 130.36 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,833.00 122.47 130.36 130.36 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,833.00 122.47 130.36 130.36 =============== 412-00190 Conc Pvmt (Patching) Sq Yard ================================================ FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 100.00 200.00 300.33 300.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 6,227.00 135.00 345.50 250.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 117.00 150.00 315.00 105.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 5.00 300.00 583.60 842.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6,449.00 136.41 343.35 248.60 IM0761-226 I76/SH52 Interchange 04/02/20 174.00 250.00 263.27 130.48 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 19.00 310.00 282.00 225.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 12.00 300.00 337.83 161.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 205.00 258.49 266.13 141.03 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 271.00 175.00 191.28 110.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 271.00 175.00 191.28 110.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,925.00 141.53 324.32 240.01 =============== 412-00600 Conc Pvmt (6 In) Sq Yard ================================================ BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 56.00 77.00 131.19 260.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 150.00 100.00 162.13 115.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 265.00 80.00 83.71 81.11 STRR300-249 Grand and Jackson Counties AD 03/05/20 329.00 150.00 135.00 98.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 31.00 150.00 154.20 114.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 831.00 113.73 133.14 107.20 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 231 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 412-00600 Conc Pvmt (6 In) Sq Yard ================================================ IM0761-226 I76/SH52 Interchange 04/02/20 38.00 130.00 100.83 52.88 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 88.00 120.00 184.33 99.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 126.00 123.02 142.42 85.09 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 58.00 150.00 120.00 120.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 97.00 100.00 100.54 78.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 105.00 105.00 109.00 84.98 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 304.00 114.00 99.57 67.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 564.00 113.62 102.23 77.69 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 1,222.00 100.00 162.00 151.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 88.00 48.58 52.14 52.14 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,310.00 96.55 159.42 144.36 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,831.00 106.17 132.97 117.53 =============== 412-00601 Conc Pvmt (6 In) (Spec) Sq Yard ================================================ NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 1,222.00 150.00 184.00 172.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,222.00 150.00 184.00 172.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,222.00 150.00 184.00 172.00 =============== 412-00605 Conc Pvmt (6 In) (Fast Track) Sq Yard ================================================ CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 42.00 200.00 122.41 122.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 42.00 200.00 122.41 122.00 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 349.00 150.00 181.67 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 349.00 150.00 181.67 125.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 391.00 155.37 173.47 124.68 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 232 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 412-00700 Conc Pvmt (7 In) Sq Yard ================================================ STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 116,631.00 35.00 41.29 34.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 116,631.00 35.00 41.29 34.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 116,631.00 35.00 41.29 34.80 =============== 412-00701 Conc Pvmt (7 In) (Spec) Sq Yard ================================================ STMM086-083 ADA PUEBLO METRO 07/09/20 1,238.00 100.00 126.50 113.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,238.00 100.00 126.50 113.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,238.00 100.00 126.50 113.00 =============== 412-00800 Conc Pvmt (8 In) Sq Yard ================================================ FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 1,385.00 100.00 80.00 80.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 309.00 130.00 134.33 147.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,694.00 105.47 101.79 92.22 FSAC010-124 US 40, US 287, SH 88 08/06/20 17.00 200.00 165.33 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 17.00 200.00 165.33 200.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 146.00 200.00 117.50 105.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 371,037.00 43.93 47.01 47.01 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 371,183.00 43.99 47.07 47.03 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 372,894.00 44.28 47.42 47.25 =============== 412-00801 Conc Pvmt (8 In) (Spec) Sq Yard ================================================ FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 456.00 160.00 110.00 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 456.00 160.00 110.00 110.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 233 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 412-00801 Conc Pvmt (8 In) (Spec) Sq Yard ================================================ IM0761-226 I76/SH52 Interchange 04/02/20 2,232.00 105.00 109.54 110.64 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,232.00 105.00 109.54 110.64 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1,131.00 83.00 89.08 89.08 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,131.00 83.00 89.08 89.08 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,819.00 105.05 108.20 104.18 =============== 412-00805 Conc Pvmt (8 In) (Fast Track) Sq Yard ================================================ C1601-082 Hawkins Signal and Curb Ramps 04/30/20 316.00 150.00 197.67 168.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 316.00 150.00 197.67 168.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 316.00 150.00 197.67 168.00 =============== 412-00815 Conc Pvmt (8 In) (R) Sq Yard ================================================ NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1,074.00 200.00 125.00 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,074.00 200.00 125.00 120.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,074.00 200.00 125.00 120.00 =============== 412-00850 Conc Pvmt (8-1/2 In) Sq Yard ================================================ FSA2873-194 US 287 Longmont Intersection 02/13/20 1,979.00 88.00 135.83 91.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,979.00 88.00 135.83 91.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 15,501.00 50.00 52.87 45.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 15,501.00 50.00 52.87 45.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17,480.00 54.30 62.26 50.56 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 234 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 412-00870 Conc Pvmt (8-1/2 In) (Fast Track) Sq Yard ================================================ FSA2873-194 US 287 Longmont Intersection 02/13/20 89.00 125.00 298.17 104.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 89.00 125.00 298.17 104.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 89.00 125.00 298.17 104.00 =============== 412-00900 Conc Pvmt (9 In) Sq Yard ================================================ NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 8,664.00 82.00 84.43 95.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 692.00 90.00 142.85 147.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9,356.00 82.59 87.39 98.88 IM0761-226 I76/SH52 Interchange 04/02/20 36,648.00 72.00 74.38 60.25 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 118,410.00 35.00 57.04 40.46 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 155,058.00 43.74 60.74 45.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 164,414.00 45.96 61.33 48.20 =============== 412-00920 Conc Pvmt (9 In) (Fast Track) Sq Yard ================================================ HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1,796.00 120.00 145.70 150.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,796.00 120.00 145.70 150.05 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,796.00 120.00 145.70 150.05 =============== 412-01000 Conc Pvmt (10 In) Sq Yard ================================================ C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 27.00 200.00 161.50 158.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 27.00 200.00 161.50 158.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 7,555.00 125.00 130.67 132.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 235 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 412-01000 Conc Pvmt (10 In) Sq Yard ================================================ NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 130.00 175.00 166.67 180.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7,685.00 125.85 131.28 132.81 CR100-342 US-6 at Garrison 12/17/20 141.00 135.00 160.75 184.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 141.00 135.00 160.75 184.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,853.00 126.27 132.38 133.82 =============== 412-01001 Conc Pvmt (10 In) (Spec) Sq Yard ================================================ FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 123.00 160.00 177.67 178.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 123.00 160.00 177.67 178.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 123.00 160.00 177.67 178.00 =============== 412-01020 Conc Pvmt (10 In) (Fast Track) Sq Yard ================================================ C1601-082 Hawkins Signal and Curb Ramps 04/30/20 81.00 160.00 241.67 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 81.00 160.00 241.67 200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 81.00 160.00 241.67 200.00 =============== 412-01050 Conc Pvmt (10-1/2 In) Sq Yard ================================================ SHE 0703-461 I-70 and Kipling North Phase 03/26/20 661.00 175.00 170.20 151.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 661.00 175.00 170.20 151.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1,593.00 150.00 148.00 88.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,593.00 150.00 148.00 88.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,254.00 157.33 153.08 106.48 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 236 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 412-01100 Conc Pvmt (11 In) Sq Yard ================================================ STR2871-038 US 287 Passing Lanes Springfi 03/05/20 31,992.00 65.00 63.65 61.37 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 31,992.00 65.00 63.65 61.37 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 31,992.00 65.00 63.65 61.37 =============== 412-01120 Conc Pvmt (11 In) (Fast Track) Sq Yard ================================================ SHE 0703-461 I-70 and Kipling North Phase 03/26/20 168.00 200.00 249.80 142.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 168.00 200.00 249.80 142.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 300.00 175.00 205.50 115.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 352.00 135.00 202.67 113.33 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 652.00 153.40 204.10 114.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 820.00 162.95 212.82 119.81 =============== 412-01200 Conc Pvmt (12 In) Sq Yard ================================================ FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 1,694.00 62.00 118.28 130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,694.00 62.00 118.28 130.00 IM0761-226 I76/SH52 Interchange 04/02/20 2,465.00 110.00 93.33 66.51 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,465.00 110.00 93.33 66.51 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,159.00 90.45 99.00 92.37 =============== 412-01250 Conc Pvmt (12-1/2 In) Sq Yard ================================================ SFTY2254-091 225 Ramp Improvements 04/09/20 5,987.00 120.00 146.00 112.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,987.00 120.00 146.00 112.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,987.00 120.00 146.00 112.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 237 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 412-01255 Conc Pvmt (12 In) (Spec) Sq Yard ================================================ BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 441.00 765.00 273.29 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 441.00 765.00 273.29 200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 441.00 765.00 273.29 200.00 =============== 412-02000 Conc Safety Edge Lin Foot =============================================== STR2871-038 US 287 Passing Lanes Springfi 03/05/20 13,315.00 4.00 3.11 3.52 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 13,315.00 4.00 3.11 3.52 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 23,634.00 5.00 3.18 2.72 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 23,634.00 5.00 3.18 2.72 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 61,731.00 3.74 4.01 4.01 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 61,731.00 3.74 4.01 4.01 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 98,680.00 4.08 3.35 3.63 =============== 412-06060 Conc Pvmt TWT (6 Inch) Sq Yard ================================================ NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 1,222.00 200.00 197.67 183.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,222.00 200.00 197.67 183.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,222.00 200.00 197.67 183.00 =============== 412-11000 Conc Pave Dowel Bar Retro Each =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 1,032.00 110.00 90.68 130.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 238 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 412-11000 Conc Pave Dowel Bar Retro Each =================================================== NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 3,138.00 120.00 135.00 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,170.00 117.53 120.36 145.05 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,170.00 117.53 120.36 145.05 =============== 412-15000 Routing and Sealing Cracks Lin Foot =============================================== NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 1,099.00 45.00 16.00 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,099.00 45.00 16.00 25.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,099.00 45.00 16.00 25.00 =============== 412-16000 Cleaning + Sealing Joints Lin Foot =============================================== NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 117,066.00 3.50 2.08 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 117,066.00 3.50 2.08 3.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 117,066.00 3.50 2.08 3.00 =============== 420-00000 Geomembrane Sq Yard ================================================ NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 840.00 30.00 27.23 13.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 2,483.00 40.00 12.82 13.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,323.00 37.47 14.44 13.30 IM0761-226 I76/SH52 Interchange 04/02/20 225.00 15.00 19.56 5.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 225.00 15.00 19.56 5.30 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 12,235.00 8.71 9.54 9.54 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12,235.00 8.71 9.54 9.54 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 239 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 420-00000 Geomembrane Sq Yard ================================================ FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 534.00 12.60 12.60 12.60 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 563.00 12.00 19.97 12.40 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 2,090.00 12.41 14.52 14.52 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,187.00 12.37 17.41 13.82 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18,970.00 14.44 13.63 10.87 =============== 420-00102 Geotextile (Er Cont) (CL 1) Sq Yard ================================================ STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 1,692.00 4.00 2.50 2.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 350.00 8.00 5.40 2.77 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,042.00 4.69 3.72 2.13 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 4,630.00 6.00 4.54 5.68 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 850.00 2.00 4.32 4.32 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,480.00 5.38 4.54 5.47 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 365.00 5.00 6.64 3.24 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 442.00 6.00 7.00 7.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 45.00 4.00 36.00 65.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 311.00 6.81 7.93 8.50 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 35.00 8.00 37.05 37.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,198.00 5.89 7.99 9.30 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 21,837.00 1.46 2.28 2.28 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 21,837.00 1.46 2.28 2.28 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30,557.00 2.55 4.03 3.12 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 240 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 420-00103 Geotextile (Er Cont) (CL 2) Sq Yard ================================================ NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 378.00 6.00 7.17 5.28 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 378.00 6.00 7.17 5.28 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 19.00 15.00 21.33 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 19.00 15.00 21.33 25.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 397.00 6.43 7.85 6.22 =============== 420-00112 Geotextile (Drain) (CL 1) Sq Yard ================================================ NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 57.00 6.00 14.15 11.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 1,969.00 5.50 4.38 4.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 233.00 4.00 5.25 5.25 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 181.00 8.00 8.19 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,440.00 5.55 4.92 4.36 IM0761-226 I76/SH52 Interchange 04/02/20 679.00 4.00 7.12 1.52 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 850.00 6.00 3.35 2.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,529.00 5.11 4.79 2.15 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 16.00 6.00 13.00 6.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 16.00 6.00 13.00 6.50 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 3,678.00 4.00 3.01 3.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,678.00 4.00 3.01 3.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,663.00 4.72 4.02 3.51 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 241 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 420-00113 Geotextile (Drain) (CL 2) Sq Yard ================================================ NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 927.00 8.00 4.86 6.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 48.00 6.00 49.28 5.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 975.00 7.90 5.43 5.97 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 4.00 70.00 98.33 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 70.00 98.33 45.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 16.00 38.27 38.27 38.27 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 16.00 38.27 38.27 38.27 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 995.00 8.64 5.64 6.64 =============== 420-00114 Geotextile (Drain) (CL 3) Sq Yard ================================================ FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 1,036.00 8.00 7.00 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,036.00 8.00 7.00 7.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,036.00 8.00 7.00 7.00 =============== 420-00132 Geotextile (Separator) (CL 1) Sq Yard ================================================ NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 84,446.00 2.00 2.94 2.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 84,446.00 2.00 2.94 2.30 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 10,332.00 5.00 5.17 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10,332.00 5.00 5.17 5.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 2,722.00 2.00 3.03 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,722.00 2.00 3.03 5.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 97,500.00 2.32 3.03 2.66 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 242 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 420-00133 Geotextile (Separator) (CL 2) Sq Yard ================================================ STR184B-006 CULVERTS SH 184 08/06/20 70.00 40.00 21.00 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 70.00 40.00 21.00 21.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 20,652.00 2.00 2.71 2.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 20,652.00 2.00 2.71 2.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20,722.00 2.13 2.72 2.41 =============== 420-00200 Geotextile (Weed Barrier) Sq Yard ================================================ NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 359.00 7.00 7.33 1.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 359.00 7.00 7.33 1.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 359.00 7.00 7.33 1.60 =============== 420-00300 Geotextile (Reinforcement) Sq Yard ================================================ C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 2,298.00 6.00 7.07 5.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,298.00 6.00 7.07 5.25 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1,000.00 5.78 5.78 5.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,000.00 5.78 5.78 5.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,298.00 5.93 7.00 5.41 =============== 420-00520 Geogrid Pvmt Reinf Sq Yard ================================================ NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 4,257.00 13.00 3.88 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,257.00 13.00 3.88 4.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,257.00 13.00 3.88 4.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 243 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 501-00000 Steel Sheet Pile (Ty I) Sq Foot ================================================ NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 825.00 100.88 81.62 81.62 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 825.00 100.88 81.62 81.62 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 825.00 100.88 81.62 81.62 =============== 501-00200 Steel Sheet Pile (Ty II) Sq Foot ================================================ NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 1,337.00 55.00 43.77 28.44 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,337.00 55.00 43.77 28.44 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,337.00 55.00 43.77 28.44 =============== 502-00100 Drill Hole Fac Pile Driving Lin Foot =============================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 640.00 50.00 42.36 47.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 640.00 50.00 42.36 47.60 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 733.00 25.00 34.20 34.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 733.00 25.00 34.20 34.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,373.00 36.65 41.33 40.45 =============== 502-00460 Pile Tip Each =================================================== BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 28.00 175.00 220.83 250.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 32.00 180.00 189.33 133.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 60.00 177.67 201.81 187.60 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 14.00 200.00 216.67 357.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 244 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 502-00460 Pile Tip Each =================================================== FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 16.00 200.00 292.66 250.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 52.00 161.00 186.74 186.74 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 82.00 175.27 247.14 228.24 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 56.00 180.00 196.07 225.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 180.00 179.65 230.77 230.77 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 236.00 179.73 206.99 229.40 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 112.00 200.00 210.00 205.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 14.00 187.39 227.95 227.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 126.00 198.60 210.37 207.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 504.00 183.48 213.27 218.77 =============== 502-00500 CJP Splice Each =================================================== BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 28.00 600.00 584.47 1.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 32.00 300.00 887.77 1.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 60.00 440.00 767.59 1.05 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 14.00 1000.00 771.24 467.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 16.00 600.00 659.18 1.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 2.00 700.00 1321.47 1321.47 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 32.00 781.25 712.96 287.62 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 56.00 400.00 448.73 1.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 245 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 502-00500 CJP Splice Each =================================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 32.00 660.75 1320.79 1320.79 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 88.00 494.82 514.55 480.92 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1.00 1055.78 1297.79 1297.79 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1055.78 1297.79 1297.79 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 181.00 530.39 658.42 292.19 =============== 502-02010 Dynamic Pile Test Each =================================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 2.00 3504.00 3798.49 3700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 3504.00 3798.49 3700.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 4.00 2700.00 2675.00 2675.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 2700.00 2675.00 2675.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 26.00 2500.00 2867.60 2867.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 26.00 2500.00 2867.60 2867.60 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 2.00 2500.00 2568.00 2568.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 2500.00 2568.00 2568.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 34.00 2582.59 3149.36 2876.28 =============== 502-11253 Steel Pile (HP 12x53) Lin Foot =============================================== IM0761-226 I76/SH52 Interchange 04/02/20 732.00 95.00 86.42 130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 732.00 95.00 86.42 130.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 732.00 95.00 86.42 130.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 246 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 502-11274 Steel Pile (HP 12x74) Lin Foot =============================================== BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 1,407.00 90.00 83.08 90.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1,168.00 80.00 88.74 79.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,575.00 85.46 86.05 85.12 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 584.00 95.00 91.16 95.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 584.00 95.00 91.16 95.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 5,488.00 90.00 72.77 73.10 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 803.00 98.24 104.42 104.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6,291.00 91.05 73.52 77.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,450.00 89.77 79.08 80.39 =============== 502-11284 Steel Pile (HP 12x84) Lin Foot =============================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 530.00 85.00 125.91 137.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 530.00 85.00 125.91 137.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 530.00 85.00 125.91 137.50 =============== 502-11473 Steel Pile (HP 14x73) Lin Foot =============================================== IM0761-226 I76/SH52 Interchange 04/02/20 97.00 110.00 144.64 185.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 97.00 110.00 144.64 185.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 97.00 110.00 144.64 185.00 =============== 502-11489 Steel Pile (HP 14x89) Lin Foot =============================================== NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1,284.00 102.00 103.38 103.38 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,284.00 102.00 103.38 103.38 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 247 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 502-11489 Steel Pile (HP 14x89) Lin Foot =============================================== NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 2,294.00 100.00 92.91 69.95 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 5,572.48 113.36 135.64 135.64 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7,866.48 109.46 103.92 116.48 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,150.48 108.42 103.89 114.64 =============== 502-14117 Steel Pile (HP 14x117) Lin Foot =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1,406.00 135.21 161.14 161.14 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,406.00 135.21 161.14 161.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,406.00 135.21 161.14 161.14 =============== 503-00012 Drilled Shaft (12 In) Lin Foot =============================================== NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 40.00 150.00 186.33 113.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 40.00 150.00 186.33 113.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 150.00 186.33 113.00 =============== 503-00018 Drilled Shaft (18 In) Lin Foot =============================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 16.00 240.00 399.13 365.00 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 25.00 225.00 255.67 275.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 18.00 200.00 250.00 250.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1,640.00 200.00 220.67 155.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 35.00 220.00 620.61 579.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 10.00 250.00 333.00 336.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 20.00 275.00 208.20 193.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,764.00 202.25 243.50 169.44 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 5.00 200.00 499.00 445.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 248 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 503-00018 Drilled Shaft (18 In) Lin Foot =============================================== FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 20.00 275.00 269.33 133.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 25.00 260.00 315.27 195.40 FSAC010-124 US 40, US 287, SH 88 08/06/20 6.00 250.00 318.33 210.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 250.00 318.33 210.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 10.00 400.00 352.00 360.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 25.00 300.00 255.00 325.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 35.00 134.86 145.26 145.26 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 70.00 231.72 246.91 240.13 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,865.00 204.28 244.76 172.58 =============== 503-00024 Drilled Shaft (24 In) Lin Foot =============================================== IM0761-226 I76/SH52 Interchange 04/02/20 12.00 300.00 310.78 349.80 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 60.00 300.00 328.30 275.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 72.00 300.00 324.47 287.88 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 28.00 300.00 300.00 300.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 20.00 300.00 326.27 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 48.00 300.00 313.59 300.00 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 72.00 325.00 531.11 253.33 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 7.00 400.00 277.50 275.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 7.00 384.30 384.30 384.30 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 37.00 295.65 318.05 318.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 123.00 323.81 485.63 281.49 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 243.00 312.05 379.89 287.04 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 249 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 503-00030 Drilled Shaft (30 In) Lin Foot =============================================== FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 624.00 373.40 373.40 373.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 624.00 373.40 373.40 373.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 624.00 373.40 373.40 373.40 =============== 503-00036 Drilled Shaft (36 In) Lin Foot =============================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 19.00 550.00 573.10 510.00 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 30.00 415.00 402.67 445.00 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 68.00 500.00 483.74 625.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 1,458.00 400.00 205.00 125.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 114.00 600.00 930.00 360.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 95.00 550.00 575.67 390.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 53.00 800.00 650.18 715.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 57.00 500.00 909.50 952.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 152.00 550.00 388.80 360.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,046.00 447.34 289.82 231.07 IM0761-226 I76/SH52 Interchange 04/02/20 57.00 400.00 372.85 367.82 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 57.00 600.00 411.43 401.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 152.00 360.00 426.87 300.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 76.00 800.00 1115.33 507.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 95.00 350.00 397.33 342.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 75.00 400.00 561.67 385.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 512.00 460.49 500.22 369.82 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 96.00 450.00 535.75 380.50 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 190.00 300.00 427.50 495.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 96.00 400.00 447.33 375.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 95.00 550.00 609.71 550.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 76.00 200.00 398.53 368.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 553.00 372.60 512.96 446.29 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 105.00 425.00 781.45 234.34 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 250 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 503-00036 Drilled Shaft (36 In) Lin Foot =============================================== NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 19.00 500.00 1225.00 1165.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 57.00 375.00 562.50 375.00 FSA1211-098 SH 121 & 1ST AVE 11/19/20 38.00 450.00 455.67 325.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 239.00 400.00 485.00 495.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 186.00 357.89 386.38 386.38 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 644.00 395.60 580.46 420.24 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,755.00 429.25 376.17 314.13 =============== 503-00037 Drilled Shaft (36 In)(Spec) Lin Foot =============================================== NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 19.00 600.00 515.00 540.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 19.00 600.00 515.00 540.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19.00 600.00 515.00 540.00 =============== 503-00042 Drilled Shaft (42 In) Lin Foot =============================================== ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 136.00 1200.00 813.50 750.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 17.00 550.00 654.00 467.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 153.00 1127.78 788.32 718.56 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 17.00 700.00 1395.00 1325.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 17.00 550.00 602.50 555.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 451.00 354.36 364.25 364.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 485.00 373.33 477.44 404.61 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 638.00 554.26 594.33 479.90 =============== 503-00048 Drilled Shaft (48 In) Lin Foot =============================================== NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 42.00 575.00 506.67 495.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 42.00 700.00 1295.00 590.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 21.00 650.00 1013.33 1400.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 36.00 900.00 886.34 901.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 141.00 706.38 876.52 761.74 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 251 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 503-00048 Drilled Shaft (48 In) Lin Foot =============================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 154.00 850.00 587.95 535.07 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 21.00 580.00 618.90 555.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 105.00 525.00 557.67 562.00 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 31.00 1500.00 1006.00 995.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 21.00 575.00 701.67 510.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 126.00 650.00 641.65 310.23 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 458.00 739.48 613.04 510.28 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 84.00 550.00 512.50 525.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 36.00 600.00 845.29 750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 120.00 565.00 712.17 592.50 MPC040-061 R2 FY 21 Sign Replacement 10/01/20 45.00 468.76 790.00 700.00 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 32.00 475.00 1343.47 370.41 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 21.00 525.00 681.50 481.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 84.00 600.00 675.00 560.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 102.00 520.82 520.82 520.82 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 129.00 676.08 728.22 728.22 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 413.00 576.41 773.97 599.41 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,132.00 657.36 687.04 582.84 =============== 503-00054 Drilled Shaft (54 In) Lin Foot =============================================== BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 219.00 600.00 629.43 750.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 21.00 1000.00 865.68 941.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 240.00 635.00 656.21 766.71 SFTY2254-091 225 Ramp Improvements 04/09/20 57.00 60.00 682.50 670.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 252 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 503-00054 Drilled Shaft (54 In) Lin Foot =============================================== C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 91.00 700.00 937.97 895.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 112.00 550.00 753.33 850.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 126.00 700.00 732.97 396.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 386.00 561.97 775.14 686.11 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 360.00 482.99 515.06 515.06 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 360.00 482.99 515.06 515.06 FSA1211-098 SH 121 & 1ST AVE 11/19/20 42.00 775.00 641.83 500.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 326.00 706.36 761.87 761.87 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 368.00 714.19 728.41 731.98 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,354.00 595.29 695.35 667.39 =============== 503-00060 Drilled Shaft (60 In) Lin Foot =============================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 528.00 1200.00 889.68 900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 528.00 1200.00 889.68 900.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 528.00 1200.00 889.68 900.00 =============== 503-00066 Drilled Shaft (66 In) Lin Foot =============================================== NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 50.00 832.49 890.76 890.76 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 50.00 832.49 890.76 890.76 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 832.49 890.76 890.76 =============== 503-00072 Drilled Shaft (72 In) Lin Foot =============================================== FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 204.00 800.29 800.29 800.29 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 204.00 800.29 800.29 800.29 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 204.00 800.29 800.29 800.29 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 253 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 503-00200 Caisson (Special) Lin Foot =============================================== FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 120.00 520.00 1641.00 1400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 120.00 520.00 1641.00 1400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 120.00 520.00 1641.00 1400.00 =============== 503-00211 Agg Column Ground Improvement Lin Foot =============================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 4,461.00 38.00 52.08 59.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,461.00 38.00 52.08 59.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,461.00 38.00 52.08 59.00 =============== 503-00310 CSL Testing Each =================================================== BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 5.00 2750.00 2057.49 1300.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 2750.00 2057.49 1300.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 4.00 1500.00 3232.84 3630.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 1500.00 3232.84 3630.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 6.00 2950.00 3156.50 3156.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 2950.00 3156.50 3156.50 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 6.00 2950.00 3156.50 3156.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 2950.00 3156.50 3156.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21.00 2626.19 2743.97 2804.67 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 254 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 504-04410 Block Facing Sq Foot ================================================ IM0761-226 I76/SH52 Interchange 04/02/20 225.00 90.00 74.24 83.21 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 225.00 90.00 74.24 83.21 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 225.00 90.00 74.24 83.21 =============== 504-04420 Precast Panel Facing Sq Foot ================================================ NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 11,301.00 36.00 46.21 46.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11,301.00 36.00 46.21 46.50 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 5,546.00 41.63 49.07 49.07 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5,546.00 41.63 49.07 49.07 C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 1,989.00 80.00 116.45 92.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 772.00 40.00 109.83 127.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 6,625.00 42.35 45.48 45.48 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9,386.00 50.14 92.83 62.04 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26,233.00 42.25 54.78 52.60 =============== 504-04440 Facing (Special) Sq Foot ================================================ C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 16,770.00 50.00 43.05 32.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 16,770.00 50.00 43.05 32.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16,770.00 50.00 43.05 32.50 =============== 504-05000 Wire Mesh Facing Sq Foot ================================================ NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 11,301.00 30.00 22.34 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11,301.00 30.00 22.34 25.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 255 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 504-05000 Wire Mesh Facing Sq Foot ================================================ C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 6,912.00 45.00 29.26 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6,912.00 45.00 29.26 16.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18,213.00 35.69 24.26 21.58 =============== 504-06310 Ground Nail (10 Foot) Each =================================================== C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 114.00 750.00 748.91 785.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 114.00 750.00 748.91 785.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 114.00 750.00 748.91 785.00 =============== 504-06320 Ground Nail (20 Foot) Each =================================================== C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 198.00 1500.00 1919.91 1926.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 198.00 1500.00 1919.91 1926.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 198.00 1500.00 1919.91 1926.00 =============== 504-08050 Stone Landscape Wall Sq Foot ================================================ NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 372.00 75.00 81.72 71.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 372.00 75.00 81.72 71.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 372.00 75.00 81.72 71.00 =============== 504-08255 Masonry Landscape Wall (Dry Stack) Sq Foot ================================================ C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 44.00 100.00 75.00 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 44.00 100.00 75.00 35.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 4,640.00 40.00 71.05 92.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,640.00 40.00 71.05 92.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,684.00 40.56 71.06 91.66 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 256 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 506-00005 Riprap Sq Yard ================================================ BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 279.00 250.00 88.01 51.24 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 279.00 250.00 88.01 51.24 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 177.00 35.68 86.61 72.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 177.00 35.68 86.61 72.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 456.00 166.81 87.42 59.30 =============== 506-00012 Riprap (Special) Each =================================================== NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 169.00 540.71 601.08 601.08 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 169.00 540.71 601.08 601.08 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 169.00 540.71 601.08 601.08 =============== 506-00030 Grouted Riprap Cubic Yard ============================================= PWQM240-172 El Paso County, north Colorad 01/23/20 7.00 175.00 655.00 800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7.00 175.00 655.00 800.00 SFTY2254-091 225 Ramp Improvements 04/09/20 11.00 1500.00 465.00 650.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 11.00 1500.00 465.00 650.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 76.00 500.00 411.78 425.00 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 11.00 200.00 540.00 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 87.00 462.07 432.52 510.34 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 105.00 551.67 444.95 544.29 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 257 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 506-00036 Grouted Riprap (36 In) (Special) Cubic Yard ============================================= NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 9.00 500.00 805.00 880.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9.00 500.00 805.00 880.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 500.00 805.00 880.00 =============== 506-00100 Riprap (Gabions) Cubic Yard ============================================= NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 90.00 300.00 490.00 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 90.00 300.00 490.00 500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 90.00 300.00 490.00 500.00 =============== 506-00206 Riprap (6 In) Cubic Yard ============================================= NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 110.00 160.00 122.94 82.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 110.00 160.00 122.94 82.00 IM0761-226 I76/SH52 Interchange 04/02/20 79.00 108.00 125.03 137.01 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 554.00 110.00 108.02 85.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 633.00 109.75 109.91 91.49 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 825.00 122.17 145.33 145.33 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 825.00 122.17 145.33 145.33 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 7.00 175.00 234.25 317.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 1.80 100.00 1468.09 200.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1,819.00 97.65 97.65 97.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,827.80 97.95 106.36 98.59 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,395.80 108.04 113.90 108.09 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 258 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 506-00209 Riprap (9 In) Cubic Yard ============================================= FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 401.00 140.00 150.00 150.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 18.00 212.00 214.42 137.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 16.00 135.00 191.60 205.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STR0101-027 SH 10 Overlay La Junta West 02/27/20 3.00 450.00 810.41 900.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 248.00 150.00 98.16 85.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 24.00 120.00 322.93 161.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 710.00 145.84 118.70 131.75 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1,913.00 115.00 91.78 80.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 2.00 500.00 351.00 343.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 6.00 150.00 209.10 240.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,921.00 115.51 92.29 80.77 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 31.00 140.00 167.50 115.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 17.00 180.00 275.00 300.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 8.00 204.20 204.20 204.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 56.00 161.31 205.47 183.90 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 88.00 80.00 104.12 77.50 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 8,529.00 77.98 81.99 81.99 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8,617.00 78.00 83.28 81.94 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,304.00 89.05 92.24 85.38 =============== 506-00212 Riprap (12 In) Cubic Yard ============================================= NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 115.00 125.00 195.98 137.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 963.00 140.00 151.91 140.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 259 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 506-00212 Riprap (12 In) Cubic Yard ============================================= NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 9.00 400.00 225.00 225.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 228.00 140.00 99.71 86.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,315.00 140.47 141.93 130.96 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 16.00 200.00 192.33 196.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1,299.00 125.00 96.32 80.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP NH050A-035 US 50A Pueblo Regional Pond 05/28/20 668.00 115.00 108.23 80.00 NH050A-037 US 50A Pueblo Regional Pond -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,983.00 122.24 100.64 80.94 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 37.00 105.00 201.39 94.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 37.00 105.00 201.39 94.70 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 24.00 100.00 224.40 199.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 16.00 140.00 273.38 275.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 66.00 114.45 114.45 114.45 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 344.00 85.00 97.30 81.60 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 643.00 88.86 98.00 98.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,093.00 90.18 105.90 98.64 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,428.00 119.59 114.38 100.28 =============== 506-00218 Riprap (18 In) Cubic Yard ============================================= NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 101.00 170.00 102.96 87.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 101.00 170.00 102.96 87.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 210.00 100.00 109.57 83.60 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 260 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 506-00218 Riprap (18 In) Cubic Yard ============================================= FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 800.00 150.00 150.77 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,010.00 139.60 142.97 112.43 STR184B-006 CULVERTS SH 184 08/06/20 60.00 225.00 265.00 265.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 60.00 225.00 265.00 265.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 409.00 100.00 93.42 98.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 409.00 100.00 93.42 98.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,580.00 134.54 130.96 112.99 =============== 506-00224 Riprap (24 In) Cubic Yard ============================================= STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 2,255.00 140.00 156.50 143.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 259.00 200.00 250.00 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,514.00 146.18 161.58 154.02 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 407.00 110.00 142.84 121.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 407.00 110.00 142.84 121.00 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 72.00 0.00 250.40 236.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 3,458.00 109.29 121.38 121.38 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,530.00 107.06 133.55 123.72 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,451.00 122.49 147.39 135.36 =============== 506-00230 Riprap (30 In) Cubic Yard ============================================= NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 532.00 200.00 150.00 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 532.00 200.00 150.00 150.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 532.00 200.00 150.00 150.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 261 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 506-00409 Soil Riprap (9 In) Cubic Yard ============================================= PWQM240-172 El Paso County, north Colorad 01/23/20 6.00 90.00 170.50 211.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 90.00 170.50 211.00 IM0761-226 I76/SH52 Interchange 04/02/20 148.00 95.00 108.19 103.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 288.00 191.00 135.60 135.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 436.00 158.41 114.15 124.53 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 19.00 184.33 252.46 252.46 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 19.00 184.33 252.46 252.46 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 461.00 158.59 116.59 130.93 =============== 506-00412 Soil Riprap (12 In) Cubic Yard ============================================= BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 104.00 150.00 147.83 120.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC PWQM240-172 El Paso County, north Colorad 01/23/20 118.00 130.00 109.50 119.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 222.00 139.37 137.31 119.47 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 15.00 150.00 170.88 200.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 195.00 180.00 99.54 99.54 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 210.00 177.86 126.72 106.72 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 150.00 125.00 114.88 68.38 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 318.00 75.00 96.57 85.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 468.00 91.03 101.84 79.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 900.00 123.21 110.76 95.80 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 262 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 506-00418 Soil Riprap (18 In) Cubic Yard ============================================= PWQM240-172 El Paso County, north Colorad 01/23/20 2,733.00 150.00 111.50 113.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,733.00 150.00 111.50 113.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,733.00 150.00 111.50 113.00 =============== 506-00424 Soil Riprap (24 In) Cubic Yard ============================================= NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 914.00 111.09 147.92 147.92 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 914.00 111.09 147.92 147.92 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 914.00 111.09 147.92 147.92 =============== 506-00700 Void-Filled Riprap Cubic Yard ============================================= NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 2,123.00 178.09 185.30 185.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,123.00 178.09 185.30 185.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,123.00 178.09 185.30 185.30 =============== 506-01020 Geogrid Reinforce Sq Yard ================================================ NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 150.00 10.00 15.55 5.50 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 4,599.00 4.00 5.23 4.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,749.00 4.19 5.35 4.29 STM094A-038 SH94 WB PASSING LANE 09/01/20 250.00 13.02 13.02 13.02 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 168.00 10.00 6.86 4.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 418.00 11.81 8.08 9.64 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 5,444.00 3.50 2.81 7.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 263 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 506-01020 Geogrid Reinforce Sq Yard ================================================ C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 10,320.00 5.00 11.02 8.50 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 42,000.00 1.75 2.65 2.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 57,764.00 2.50 3.97 3.74 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 62,931.00 2.69 4.12 3.82 =============== 507-00000 Conc S and D Pave Cubic Yard ============================================= NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 101.00 250.00 629.80 539.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 8.60 1900.00 1255.00 1255.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 4.00 800.00 940.67 1200.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 95.00 570.00 855.52 881.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 208.60 474.30 770.32 736.95 SFTY2254-091 225 Ramp Improvements 04/09/20 178.00 1200.00 1042.00 934.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 12.00 850.00 1190.22 77.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 190.00 1177.89 1073.48 879.87 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 6.00 620.00 1392.14 2500.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 2.00 1000.00 1122.21 564.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 60.00 615.65 811.07 811.07 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 68.00 627.34 1057.90 952.83 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 110.00 946.20 946.20 946.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 110.00 946.20 946.20 946.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 576.60 814.22 866.75 849.42 =============== 507-00100 Conc S and D Pave (Reinf) Cubic Yard ============================================= FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 19.00 850.00 859.70 1000.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 264 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 507-00100 Conc S and D Pave (Reinf) Cubic Yard ============================================= PWQM240-172 El Paso County, north Colorad 01/23/20 45.00 850.00 1245.50 1091.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 164.00 600.00 910.56 840.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 228.00 670.18 929.23 902.87 IM0761-226 I76/SH52 Interchange 04/02/20 21.10 750.00 948.39 675.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 21.10 750.00 948.39 675.00 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 2.00 1000.00 1052.00 1900.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 158.00 660.00 741.29 450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 160.00 664.25 744.07 468.13 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 2.00 700.00 1993.33 1680.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 46.00 851.09 1402.60 1402.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 48.00 844.79 1470.76 1414.16 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 457.10 690.12 865.93 793.87 =============== 507-00350 Gr Riprap S and D Pave Cubic Yard ============================================= NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 678.00 500.00 355.73 270.61 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 678.00 500.00 355.73 270.61 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 678.00 500.00 355.73 270.61 =============== 507-00400 Asphalt S and D Pave (Asph) Ton ==================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 24.00 320.00 405.38 351.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 6.00 400.00 340.10 310.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 27.00 400.00 382.50 385.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 57.00 366.32 383.25 362.79 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 265 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 507-00400 Asphalt S and D Pave (Asph) Ton ==================================================== IM0761-226 I76/SH52 Interchange 04/02/20 14.00 450.00 463.88 424.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 14.00 450.00 463.88 424.00 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 21.00 300.00 285.33 379.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 21.00 300.00 285.33 379.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 92.00 363.91 388.61 375.98 =============== 507-00550 Concrete Lined Ditch Lin Foot =============================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 228.00 50.00 128.90 176.66 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 228.00 50.00 128.90 176.66 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 210.00 50.00 93.37 28.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 2,768.00 91.64 115.07 115.07 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,978.00 88.70 107.54 108.93 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,206.00 85.95 113.97 113.75 =============== 507-00725 S and D Paving (Special) Lin Foot =============================================== NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 20,500.00 30.38 32.51 32.51 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 20,500.00 30.38 32.51 32.51 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20,500.00 30.38 32.51 32.51 =============== 507-00750 Irrigation Ditch System LUMP SUM =============================================== NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 1.00 20000.00 22651.67 5780.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 20000.00 22651.67 5780.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 20000.00 22651.67 5780.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 266 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 508-00520 Insulation Material (2 In) Sq Foot ================================================ NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 800.00 7.50 5.53 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 800.00 7.50 5.53 9.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 800.00 7.50 5.53 9.00 =============== 509-00000 Str Steel Pound ================================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 105,842.00 3.00 8.97 4.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 105,842.00 3.00 8.97 4.15 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 6,750.00 4.00 8.31 7.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6,750.00 4.00 8.31 7.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 112,592.00 3.06 8.93 4.33 =============== 509-00001 Str Steel (Galv) Pound ================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 127.00 11.00 36.50 51.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 127.00 11.00 36.50 51.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 168.00 11.97 20.47 20.47 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 168.00 11.97 20.47 20.47 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 975.00 5.00 14.37 13.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 975.00 5.00 14.37 13.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,270.00 6.52 17.09 17.86 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 267 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 509-08100 Provide Temporary Support LUMP SUM =============================================== NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 1.00 50000.00 92500.00 135000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 50000.00 92500.00 135000.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 163876.51 198422.27 198422.27 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 163876.51 198422.27 198422.27 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 106938.26 127807.42 166711.14 =============== 509-08121 Temp Bridge Deck Lin Foot =============================================== NHPPR100-251 SH 2/ Vasquez 06/25/20 40.00 850.00 637.93 802.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 40.00 850.00 637.93 802.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 850.00 637.93 802.85 =============== 510-20100 Str PA(Spec) Lin Foot =============================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 109.00 1500.00 3025.00 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 109.00 1500.00 3025.00 2500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 109.00 1500.00 3025.00 2500.00 =============== 513-00600 Bridge Drain Each =================================================== FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 2.00 5026.23 5026.23 5026.23 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 5026.23 5026.23 5026.23 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 5026.23 5026.23 5026.23 =============== 513-00690 Bridge Drain (Spec) Each =================================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 3.00 5000.00 4584.11 7150.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 268 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 513-00690 Bridge Drain (Spec) Each =================================================== FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 5000.00 4584.11 7150.00 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 4.00 10000.00 2835.00 2570.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 10000.00 2835.00 2570.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 7857.14 4001.07 4532.86 =============== 514-00000 Pipe Railing Lin Foot =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 130.00 119.02 227.06 227.06 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 130.00 119.02 227.06 227.06 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 130.00 119.02 227.06 227.06 =============== 514-00042 Ped Railing (42 In) Lin Foot =============================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 16.00 304.00 179.33 88.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16.00 304.00 179.33 88.00 IM0761-226 I76/SH52 Interchange 04/02/20 165.00 200.00 303.87 271.47 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 165.00 200.00 303.87 271.47 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 181.00 209.19 298.90 255.25 =============== 514-00054 Ped Railing (54 In) Lin Foot =============================================== NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 36.00 250.00 439.78 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 36.00 250.00 439.78 200.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 24.00 500.00 210.00 195.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 24.00 500.00 210.00 195.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 60.00 350.00 391.41 198.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 269 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 514-00201 Ped Railing (Steel) (Spec) Lin Foot =============================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 484.00 250.00 190.00 190.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 484.00 250.00 190.00 190.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 484.00 250.00 190.00 190.00 =============== 515-00120 Waterproofing (Membrane) Sq Yard ================================================ NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 3,084.00 21.00 17.39 19.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 1,441.00 22.00 19.41 16.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 1,898.00 20.00 18.03 17.06 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 7,815.00 20.00 17.50 20.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 2,318.00 18.00 19.75 17.50 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 282.00 20.00 23.01 25.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 136.00 20.00 40.46 40.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 3,580.00 20.00 17.49 17.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20,554.00 20.06 18.06 18.69 IM0761-226 I76/SH52 Interchange 04/02/20 1,384.00 20.00 19.64 17.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1,538.00 20.00 18.97 22.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 667.00 20.00 19.75 17.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 247.00 21.00 21.03 21.03 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,836.00 20.06 19.38 19.26 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 2,110.00 15.00 19.00 15.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 394.00 32.17 24.33 31.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 1,616.00 60.00 38.10 33.95 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 12,831.00 16.80 17.98 17.98 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 16,951.00 21.05 24.22 19.43 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 8,896.00 20.00 17.37 15.10 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 270 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 515-00120 Waterproofing (Membrane) Sq Yard ================================================ FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 2,069.00 18.48 18.48 18.48 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1,594.00 16.80 16.54 16.54 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 12,559.00 19.34 17.40 15.84 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 53,900.00 20.21 19.67 18.30 =============== 515-00400 Concrete Sealer Sq Yard ================================================ NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 592.00 19.00 20.38 34.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 365.00 20.00 17.39 16.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 267.00 12.50 14.38 13.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,224.00 17.88 18.22 24.22 IM0761-226 I76/SH52 Interchange 04/02/20 537.00 17.00 18.52 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 537.00 17.00 18.52 15.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 75.00 120.00 38.00 45.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 248.00 12.05 12.05 12.05 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 1,566.00 15.00 20.95 21.10 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1,540.00 8.81 9.43 9.43 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,429.00 14.30 19.42 15.73 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,190.00 15.43 18.97 17.65 =============== 515-00402 Furnish Concrete Sealer (HMWM Resin) Gallon ================================================= BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 460.00 60.00 83.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 460.00 60.00 83.00 100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 460.00 60.00 83.00 100.00 =============== 515-00404 Place Concrete Sealer (HMWM Resin) Sq Foot ================================================ BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 34,321.00 0.75 3.46 1.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 34,321.00 0.75 3.46 1.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 34,321.00 0.75 3.46 1.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 271 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 518-00000 Brdg Compress Joint Sealer Lin Foot =============================================== NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 64.00 90.00 112.51 105.01 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 64.00 90.00 112.51 105.01 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 88.00 125.00 153.14 85.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 60.00 150.00 203.35 223.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 557.00 115.42 84.82 84.82 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 705.00 119.56 140.11 96.60 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 130.00 130.98 125.87 125.87 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 130.00 130.98 125.87 125.87 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 899.00 119.11 137.10 101.43 =============== 518-01001 Br Expan Joint (Asphaultic Plug) Lin Foot =============================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 379.00 160.00 271.78 181.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 102.00 150.00 163.76 157.52 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 24.00 200.00 442.75 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 505.00 159.88 261.82 191.42 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 146.00 200.00 269.85 310.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 146.00 200.00 269.85 310.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 651.00 168.88 263.75 218.01 =============== 518-01002 Br Expan Device (0-2 In) Lin Foot =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 261.00 212.27 200.19 200.19 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 261.00 212.27 200.19 200.19 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 261.00 212.27 200.19 200.19 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 272 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 518-01004 Br Expan Device (0-4 In) Lin Foot =============================================== NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 618.00 425.00 275.00 400.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 244.00 310.00 307.59 228.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 862.00 392.45 294.96 351.31 IM0761-226 I76/SH52 Interchange 04/02/20 142.00 310.00 317.72 275.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 173.00 415.00 253.63 264.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP NHPPR100-251 SH 2/ Vasquez 06/25/20 608.00 300.00 251.00 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 923.00 323.09 270.47 256.47 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 272.00 280.00 391.71 225.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 470.00 243.97 202.01 202.01 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 742.00 257.18 354.16 210.44 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 158.00 450.00 1896.67 1740.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 152.00 319.05 319.05 319.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 310.00 385.79 1513.60 1043.28 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,837.00 333.78 378.31 359.22 =============== 518-01050 Br Expan Device (Special) Lin Foot =============================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 58.00 150.00 329.09 310.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 58.00 150.00 329.09 310.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 58.00 150.00 329.09 310.00 =============== 518-01109 Inst Br Expan Device (Greater Than 4 In) Lin Foot =============================================== NHPPR100-251 SH 2/ Vasquez 06/25/20 40.00 700.00 451.50 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 40.00 700.00 451.50 400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 700.00 451.50 400.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 273 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 518-02030 Polyester Conc End Dam Cubic Foot ============================================= ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 39.00 225.00 901.20 750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 39.00 225.00 901.20 750.00 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 55.00 300.00 366.00 333.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 55.00 300.00 366.00 333.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 94.00 268.88 655.90 506.01 =============== 518-03000 Saw and Seal Br Joint Lin Foot =============================================== NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 102.00 30.00 36.80 33.60 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 96.00 25.00 35.76 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 198.00 27.58 36.29 36.70 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 116.00 26.00 55.15 22.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 173.00 30.00 24.78 22.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 289.00 28.39 32.41 22.30 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 781.00 25.00 43.71 55.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 30.00 25.00 29.64 28.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 811.00 25.00 43.27 54.01 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 76.00 25.00 39.07 36.20 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 391.00 30.00 36.24 33.90 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 152.00 46.38 46.38 46.38 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 619.00 33.41 37.65 37.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,917.00 28.49 40.74 42.03 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 274 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 518-03100 Rapid Cure Silicone Jt Seal Lin Foot =============================================== NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 1,120.00 70.00 21.00 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,120.00 70.00 21.00 15.00 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 39.00 90.00 212.60 240.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 39.00 90.00 212.60 240.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,159.00 70.67 36.34 22.57 =============== 519-01000 Epoxy Resin (Injection) Lin Foot =============================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 21.00 207.00 323.06 641.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 217.00 125.00 188.76 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 238.00 132.24 200.61 238.91 IM025A-048 Northbound I-25 bridge at Exi 05/28/20 782.00 400.00 124.69 52.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 782.00 400.00 124.69 52.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,020.00 337.52 142.41 95.61 =============== 519-01300 Polyurethane Resin Pound ================================================== C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 130,000.00 9.00 10.25 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 130,000.00 9.00 10.25 9.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 130,000.00 9.00 10.25 9.00 =============== 519-03030 Thin Bonded Overlay (Poly Conc) Sq Yard ================================================ STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 411.00 40.00 112.36 123.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 411.00 40.00 112.36 123.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 411.00 40.00 112.36 123.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 275 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 519-03035 Place Thin Bond Overlay (Poly Conc) Sq Yard ================================================ BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 4,872.00 40.00 64.36 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,872.00 40.00 64.36 35.00 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 119.00 175.00 267.33 242.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 119.00 175.00 267.33 242.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,991.00 43.22 66.46 39.94 =============== 519-03055 Furnish Thin Bond Overlay (Poly Conc) Cubic Foot ============================================= BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 3,704.00 95.00 114.43 150.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 232.00 150.00 199.70 211.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,936.00 98.24 118.77 153.60 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 70.00 180.00 239.33 218.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 70.00 180.00 239.33 218.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,006.00 99.67 119.69 154.72 =============== 601-01000 Conc CL B Cubic Yard ============================================= NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 3.00 1000.00 1707.83 2000.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 140.00 800.00 1179.69 1041.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 143.00 804.20 1183.90 1061.12 IM0761-226 I76/SH52 Interchange 04/02/20 23.00 1400.00 1145.10 318.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 14.00 800.00 1148.33 1210.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 153.00 550.00 1121.52 979.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 276 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-01000 Conc CL B Cubic Yard ============================================= FBR0852-108 US-85 BETWEEN LOUVIERS AND MP NH050A-035 US 50A Pueblo Regional Pond 05/28/20 334.00 800.00 815.56 700.00 NH050A-037 US 50A Pueblo Regional Pond -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 524.00 753.34 923.28 778.32 STR184B-006 CULVERTS SH 184 08/06/20 2.00 2250.00 6100.00 6100.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 12.70 640.00 1684.88 500.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 241.00 1377.60 1171.43 1171.43 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 255.70 1347.79 1338.66 1176.63 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 37.00 2200.00 1285.40 1357.00 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 3.00 1600.00 2031.25 1600.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 15.00 1800.00 755.00 325.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 20.00 1879.50 1879.50 1879.50 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 186.00 947.87 880.90 880.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 261.00 1253.23 1123.01 1001.23 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,183.70 998.12 1009.81 947.68 =============== 601-01010 Conc CL BZ Cubic Yard ============================================= STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 103.00 800.00 332.50 255.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 103.00 800.00 332.50 255.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 103.00 800.00 332.50 255.00 =============== 601-01025 Conc CL B (Misc) Cubic Yard ============================================= IM0761-226 I76/SH52 Interchange 04/02/20 1.00 1000.00 1604.44 318.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 1000.00 1604.44 318.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 53.20 966.92 971.04 971.04 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 53.20 966.92 971.04 971.04 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 54.20 967.53 1044.69 958.99 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 277 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-01050 Conc CL B (Wall) Cubic Yard ============================================= HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 4.00 1000.00 1310.00 1840.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 1000.00 1310.00 1840.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 7.00 1750.00 1507.50 1015.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 7.00 1750.00 1507.50 1015.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 1477.27 1435.68 1315.00 =============== 601-03000 Conc CL D Cubic Yard ============================================= NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 7.00 2000.00 1301.46 715.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 29.00 1900.00 1965.00 1965.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 95.00 1000.00 988.33 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 131.00 1252.67 1096.79 1198.40 IM0761-226 I76/SH52 Interchange 04/02/20 7.00 1500.00 2088.57 1351.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7.00 1500.00 2088.57 1351.50 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 5.00 1500.00 2400.00 1200.00 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 2.60 2500.00 5151.00 2750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7.60 1842.11 3954.91 1730.26 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 50.00 1000.00 1300.00 750.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 2.00 1500.00 9456.89 10060.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 127.00 450.59 501.88 501.88 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 179.00 615.78 1114.77 677.98 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 324.60 920.59 1268.13 927.17 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 278 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-03030 Conc CL D (Box) Cubic Yard ============================================= BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 388.00 800.00 644.71 544.95 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 146.00 800.00 1241.63 1058.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 534.00 800.00 824.21 685.22 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 194.00 935.00 1068.72 1068.72 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 194.00 935.00 1068.72 1068.72 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 373.50 1000.00 950.32 900.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 143.00 700.00 825.09 900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 516.50 916.94 918.90 900.00 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 17.00 600.00 1298.20 1611.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 240.40 1000.00 952.50 678.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 257.40 973.58 971.74 739.62 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,501.90 887.40 892.01 817.94 =============== 601-03040 Conc CL D (Bridge) Cubic Yard ============================================= NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 5.70 1200.00 1776.14 2087.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 763.00 750.00 810.17 850.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1,818.00 650.00 773.50 708.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,586.70 680.71 783.17 752.92 IM0761-226 I76/SH52 Interchange 04/02/20 56.10 1500.00 1463.36 1275.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 768.00 800.00 846.37 715.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 279 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-03040 Conc CL D (Bridge) Cubic Yard ============================================= FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 293.00 875.00 827.43 750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,117.10 854.82 867.34 752.30 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 232.00 650.00 1152.14 655.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 2,914.00 544.20 693.01 693.01 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,146.00 552.00 857.32 690.21 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 182.00 1200.00 743.83 632.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 182.00 1200.00 743.83 632.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,031.80 664.23 814.56 721.64 =============== 601-03050 Conc CL D (Wall) Cubic Yard ============================================= PWQM240-172 El Paso County, north Colorad 01/23/20 458.00 800.00 1303.00 1206.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 381.00 800.00 940.00 785.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 72.00 1100.00 1580.36 1275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 911.00 823.71 1146.46 1035.38 SFTY2254-091 225 Ramp Improvements 04/09/20 85.00 100.00 772.50 625.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 238.00 750.00 1011.73 759.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 427.00 1064.00 965.77 965.77 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 750.00 855.10 987.62 861.53 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 17.00 900.00 1154.50 1470.50 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 33.00 750.00 1703.57 1500.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 257.60 838.32 712.12 712.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 307.60 832.25 1176.95 838.56 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 280 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-03050 Conc CL D (Wall) Cubic Yard ============================================= CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 10.00 700.00 1495.40 1617.00 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 9.00 1000.00 1768.75 1900.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 916.00 1000.75 705.33 636.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 182.00 912.63 983.61 983.61 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,117.00 983.69 727.62 711.61 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,085.60 890.11 918.11 856.30 =============== 601-03057 Conc CL DR Cubic Yard ============================================= NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 25.50 2250.00 2689.01 2764.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 5.00 2500.00 2728.39 2656.77 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 129.00 2500.00 3250.00 3000.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 47.00 2000.00 2030.00 1960.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 1.00 2000.00 3204.77 3500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 207.50 2353.61 2880.19 2729.57 NHPPR100-251 SH 2/ Vasquez 06/25/20 71.90 1700.00 1543.95 1317.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 71.90 1700.00 1543.95 1317.90 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 31.00 1050.00 2932.14 1100.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 10.00 3000.00 2262.01 2370.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 6.00 1227.46 1326.08 1326.08 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 47.00 1487.55 2756.02 1399.07 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 36.00 3000.00 3396.67 2590.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 15.00 3000.00 3010.93 2260.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 51.00 3000.00 3283.22 2492.94 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 377.40 2208.58 2717.85 2262.96 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 281 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-04550 Conc CL G Cubic Yard ============================================= IM0761-226 I76/SH52 Interchange 04/02/20 292.90 1150.00 980.88 1000.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 214.00 1153.00 989.58 989.58 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 506.90 1151.27 981.70 995.60 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 3,310.00 1225.46 1190.72 1190.72 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,310.00 1225.46 1190.72 1190.72 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1,011.00 1195.16 1195.16 1195.16 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1,226.10 603.73 689.78 689.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,237.10 871.01 918.17 918.17 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,054.00 1088.27 1052.08 1073.67 =============== 601-06102 Concrete (Patching) Cubic Foot ============================================= NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 11.00 79.00 317.99 406.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11.00 79.00 317.99 406.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 1.00 400.00 1187.50 375.00 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 129.00 500.00 369.20 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 130.00 499.23 371.73 151.73 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 141.00 466.45 369.12 171.57 =============== 601-06150 Conc (Patching) Sq Foot ================================================ STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 2,869.00 80.00 68.34 70.82 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,869.00 80.00 68.34 70.82 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 282 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-06150 Conc (Patching) Sq Foot ================================================ NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 5.00 93.39 421.31 421.31 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 93.39 421.31 421.31 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 45.00 100.00 130.26 80.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 45.00 100.00 130.26 80.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,919.00 80.33 70.06 71.57 =============== 601-14000 Conc Footing (Ty 1) Lin Foot =============================================== NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 200.00 900.00 1374.51 800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 200.00 900.00 1374.51 800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 200.00 900.00 1374.51 800.00 =============== 601-40300 Struct Conc Coating Sq Yard ================================================ STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 7,083.00 15.00 20.38 21.20 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 5,808.00 10.00 10.10 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12,891.00 12.75 13.47 14.80 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1,141.00 12.00 13.62 13.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1,362.00 11.00 10.70 10.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,503.00 11.46 13.24 11.75 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 641.00 14.00 39.75 36.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 283 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-40300 Struct Conc Coating Sq Yard ================================================ ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 860.00 120.00 25.15 32.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,501.00 74.73 30.60 33.71 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 23.00 15.00 90.50 64.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 23.00 15.00 90.50 64.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16,918.00 18.06 15.49 16.09 =============== 601-40301 Struct Conc Coating Sq Foot ================================================ FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 11,132.00 1.52 1.52 1.52 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 11,132.00 1.52 1.52 1.52 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,132.00 1.52 1.52 1.52 =============== 601-40400 Struct Conc Stain Sq Yard ================================================ NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 3,908.00 20.00 14.42 25.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,908.00 20.00 14.42 25.40 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 476.00 15.00 21.49 16.60 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 11,807.76 8.55 9.15 9.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12,283.76 8.80 11.87 9.44 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 3,046.00 8.65 9.43 9.43 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,046.00 8.65 9.43 9.43 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19,237.76 11.05 13.33 12.68 =============== 601-40401 Struct Conc Stain Sq Foot ================================================ NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 35,024.00 4.00 2.32 2.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 35,024.00 4.00 2.32 2.40 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 284 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-40401 Struct Conc Stain Sq Foot ================================================ C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 9,160.00 6.00 4.10 3.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9,160.00 6.00 4.10 3.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 44,184.00 4.41 2.86 2.63 =============== 601-51005 Galvanic Anodes Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 263.00 28.00 37.79 43.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 180.00 60.00 29.18 28.35 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 2,570.00 27.00 30.50 26.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 629.00 31.00 39.50 39.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 25.00 27.00 39.96 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,667.00 29.38 32.75 29.66 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 125.00 30.00 38.20 38.80 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 30.00 60.00 61.96 61.96 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 155.00 35.81 39.11 43.28 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 1,335.00 50.00 40.23 37.20 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 550.00 40.00 33.36 36.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,885.00 47.08 38.23 36.89 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,707.00 35.40 35.31 32.42 =============== 602-00000 Reinf Steel Pound ================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 360.00 2.00 3.34 4.50 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 180.00 2.00 6.65 6.30 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 7,738.00 2.50 5.10 5.30 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 2,408.00 2.00 2.38 2.25 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 285 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 602-00000 Reinf Steel Pound ================================================== STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 25.00 5.00 6.10 8.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 9,861.00 5.00 2.52 2.10 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 45,295.00 1.00 1.09 1.06 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 400.00 1.60 4.30 6.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 66,267.00 1.82 1.38 1.82 IM0761-226 I76/SH52 Interchange 04/02/20 3,956.00 1.10 1.74 1.05 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 1,588.00 1.70 3.25 2.00 SFTY2254-091 225 Ramp Improvements 04/09/20 12,500.00 2.00 1.98 2.30 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 104,272.00 1.10 1.10 1.10 NHPPR100-251 SH 2/ Vasquez 06/25/20 3,615.00 1.50 2.27 2.53 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 125,931.00 1.21 1.45 1.27 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 434.00 2.00 2.18 2.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 125.00 5.00 4.59 4.70 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 4,459.00 0.99 1.19 1.19 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5,018.00 1.18 1.75 1.35 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 3,670.00 1.30 2.46 2.40 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 100.00 5.00 5.45 5.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 100.00 12.00 43.89 4.50 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 150,531.00 1.50 1.49 1.40 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 38,589.00 0.89 1.06 1.06 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 192,990.00 1.38 1.52 1.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 390,206.00 1.40 1.47 1.41 =============== 602-00020 Reinf Steel (Epoxy) Pound ================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 2,460.00 2.00 2.85 3.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 157,025.00 1.20 1.14 1.10 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 17,833.00 1.25 2.25 2.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 286 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 602-00020 Reinf Steel (Epoxy) Pound ================================================== NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 73,481.00 1.90 1.17 1.05 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 800.00 2.00 6.57 4.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 1,566.00 3.00 2.30 2.30 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 80,805.00 2.00 1.32 1.60 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 429,722.00 1.25 1.12 1.16 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 763,692.00 1.39 1.16 1.21 IM0761-226 I76/SH52 Interchange 04/02/20 65,025.00 1.50 1.48 1.15 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 232,223.00 1.20 1.15 1.43 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 41,940.00 1.20 1.52 1.40 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 79,936.00 1.26 1.23 1.23 NHPPR100-251 SH 2/ Vasquez 06/25/20 2,890.00 2.00 3.36 2.72 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 422,014.00 1.26 1.26 1.35 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 37,393.00 2.00 2.00 1.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 83,300.00 1.20 1.57 1.50 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 20,940.00 1.20 1.46 1.35 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1,483,197.50 1.13 1.20 1.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,624,830.50 1.15 1.39 1.21 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 1,000.00 1.00 8.14 5.65 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 1,278.00 2.00 3.19 2.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 278.00 3.00 5.00 6.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 215,415.00 1.62 1.62 1.62 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 15,124.00 6.00 2.02 2.25 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 328,895.00 1.75 1.91 1.91 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 561,990.00 1.81 1.87 1.82 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,372,526.50 1.33 1.28 1.33 =============== 602-00030 Reinf (FRP)(Surface) M Kip Foot ============================================= IM025A-048 Northbound I-25 bridge at Exi 05/28/20 75.00 1900.00 4258.59 4900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 75.00 1900.00 4258.59 4900.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 75.00 1900.00 4258.59 4900.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 287 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 602-00060 Reinf Steel Splice Each =================================================== STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 696.00 20.00 95.41 99.36 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 696.00 20.00 95.41 99.36 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 696.00 20.00 95.41 99.36 =============== 602-00210 Welded Wire Fabric Sq Yard ================================================ C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 3,072.00 20.00 16.02 13.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,072.00 20.00 16.02 13.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,072.00 20.00 16.02 13.25 =============== 603-00001 Annular Space Grouting Cubic Yard ============================================= NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 10.00 600.00 821.67 900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 600.00 821.67 900.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 69.00 450.00 506.17 342.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 69.00 450.00 506.17 342.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 79.00 468.99 527.48 412.63 =============== 603-00030 Culvert Lining (30 In) Lin Foot =============================================== NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 143.00 400.00 648.50 539.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 143.00 400.00 648.50 539.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 143.00 400.00 648.50 539.00 =============== 603-00043 Culvert Lining (42 In) (Spray App) Lin Foot =============================================== STR184B-006 CULVERTS SH 184 08/06/20 865.50 250.00 295.00 295.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 865.50 250.00 295.00 295.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 865.50 250.00 295.00 295.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 288 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-00047 Prepare Culvert Pipe (48 In) Lin Foot =============================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 108.00 110.00 130.00 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 108.00 110.00 130.00 200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 108.00 110.00 130.00 200.00 =============== 603-00048 Culvert Lining (48 In) Lin Foot =============================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 120.00 400.00 653.33 680.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 120.00 400.00 653.33 680.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 120.00 400.00 653.33 680.00 =============== 603-00049 Culvert Lining (48 Inch)(Special) Lin Foot =============================================== CR400-374 FY 20 Culvert Prioritization 09/17/20 102.00 1300.00 888.00 550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 102.00 1300.00 888.00 550.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 102.00 1300.00 888.00 550.00 =============== 603-00051 Culvert Lining (48 In)(Slip) Lin Foot =============================================== STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 136.00 600.00 360.00 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 136.00 600.00 360.00 300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 136.00 600.00 360.00 300.00 =============== 603-00052 Culvert Lining (48 In)(Spray App) Lin Foot =============================================== STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 403.00 520.00 330.00 330.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 403.00 520.00 330.00 330.00 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 491.00 350.00 437.33 280.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 289 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-00052 Culvert Lining (48 In)(Spray App) Lin Foot =============================================== STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 278.00 330.00 355.00 430.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 769.00 342.77 414.77 334.23 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,172.00 403.71 400.72 332.77 =============== 603-00060 Culvert Lining (60 In) Lin Foot =============================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 119.00 600.00 1045.00 1400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 119.00 600.00 1045.00 1400.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 96.00 1000.00 706.17 951.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 96.00 1000.00 706.17 951.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 215.00 778.60 835.82 1199.52 =============== 603-00061 Prep Culvert Pipe (60 In) Lin Foot =============================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 109.00 110.00 98.75 170.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 109.00 110.00 98.75 170.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 109.00 110.00 98.75 170.00 =============== 603-00062 Culvert Lining (60 Inch)(Special) Lin Foot =============================================== CR400-374 FY 20 Culvert Prioritization 09/17/20 60.00 1500.00 1400.75 550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 60.00 1500.00 1400.75 550.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 60.00 1500.00 1400.75 550.00 =============== 603-00065 Culvert Lining (60 In)(Spray App) Lin Foot =============================================== STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 86.00 700.00 540.00 710.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 86.00 700.00 540.00 710.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 290 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-00065 Culvert Lining (60 In)(Spray App) Lin Foot =============================================== NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 585.00 450.00 416.50 211.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 585.00 450.00 416.50 211.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 671.00 482.04 424.96 274.96 =============== 603-00066 Culvert Lining (66 In) Lin Foot =============================================== NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 142.00 500.00 597.50 480.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 142.00 500.00 597.50 480.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 142.00 500.00 597.50 480.00 =============== 603-00073 Culvert Lining (72 Inch)(Special) Lin Foot =============================================== CR400-374 FY 20 Culvert Prioritization 09/17/20 61.00 1700.00 1464.50 650.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 61.00 1700.00 1464.50 650.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 61.00 1700.00 1464.50 650.00 =============== 603-00078 Culvert Lining (78 In) Lin Foot =============================================== STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 120.00 600.00 470.00 320.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 120.00 600.00 470.00 320.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 120.00 600.00 470.00 320.00 =============== 603-00123 Culvert Lining (120 In) Lin Foot =============================================== NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 205.00 1500.00 1049.25 642.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 205.00 1500.00 1049.25 642.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 205.00 1500.00 1049.25 642.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 291 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-01155 15 In RCP (CIP) Lin Foot =============================================== PWQM240-172 El Paso County, north Colorad 01/23/20 583.00 145.00 137.50 115.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 583.00 145.00 137.50 115.00 IM0761-226 I76/SH52 Interchange 04/02/20 132.00 105.00 88.79 83.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 42.00 120.00 129.00 109.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 174.00 108.62 93.62 89.28 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 367.00 155.00 102.96 71.80 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 63.00 250.00 148.25 91.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 430.00 168.92 110.70 74.74 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 135.00 120.00 270.00 245.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 135.00 120.00 270.00 245.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,322.00 145.44 122.68 111.80 =============== 603-01180 18 In RCP Lin Foot =============================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 9,380.00 70.00 83.79 56.10 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 9,380.00 70.00 83.79 56.10 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 42.00 110.00 230.00 260.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 16.00 200.00 290.35 215.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 58.00 134.83 264.48 247.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,438.00 70.40 84.26 57.28 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 292 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-01185 18 In RCP (CIP) Lin Foot =============================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 23.00 120.00 140.00 140.00 PWQM240-172 El Paso County, north Colorad 01/23/20 1,060.00 155.00 134.00 98.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 132.00 150.00 120.23 115.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 2,571.00 110.00 102.55 85.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 367.00 120.00 158.08 159.20 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 70.00 125.00 169.20 121.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,223.00 123.72 108.28 96.55 IM0761-226 I76/SH52 Interchange 04/02/20 4.00 200.00 222.26 470.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 200.00 222.26 470.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 99.00 130.00 116.29 115.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 99.00 130.00 116.29 115.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 38.00 122.85 122.85 122.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 38.00 122.85 122.85 122.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,364.00 123.92 108.66 97.54 =============== 603-01240 24 In RCP Lin Foot =============================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 433.00 100.00 112.37 67.10 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 433.00 100.00 112.37 67.10 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 3.00 250.00 1022.50 1545.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 250.00 1022.50 1545.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 436.00 101.03 113.94 77.27 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 293 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-01245 24 In RCP (CIP) Lin Foot =============================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 89.00 140.00 120.00 120.00 PWQM240-172 El Paso County, north Colorad 01/23/20 630.00 170.00 197.50 195.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1,507.00 120.00 147.33 150.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1,450.00 150.00 154.62 104.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 115.00 140.00 175.78 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,791.00 140.86 155.91 138.88 IM0761-226 I76/SH52 Interchange 04/02/20 34.00 120.00 170.66 231.99 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 2,245.00 100.00 132.58 140.00 NH050A-037 US 50A Pueblo Regional Pond -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,279.00 100.30 133.07 141.37 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 216.00 220.00 149.43 200.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 213.00 146.57 160.11 160.11 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 429.00 183.54 150.75 180.19 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 30.00 150.00 357.50 365.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 59.00 247.80 247.80 247.80 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 149.00 180.00 127.78 94.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 238.00 193.03 148.38 166.72 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,737.00 131.70 144.73 143.34 =============== 603-01305 30 In RCP (CIP) Lin Foot =============================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 406.00 185.00 175.00 175.00 PWQM240-172 El Paso County, north Colorad 01/23/20 491.00 175.00 199.50 159.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 893.00 170.00 172.16 129.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,790.00 174.77 175.44 147.66 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 23.00 150.00 187.14 250.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 294 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-01305 30 In RCP (CIP) Lin Foot =============================================== STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 584.00 175.00 174.35 141.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 607.00 174.05 174.91 145.13 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,397.00 174.59 175.28 147.02 =============== 603-01360 36 In RCP Lin Foot =============================================== NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 48.00 400.00 390.00 390.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 48.00 400.00 390.00 390.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 831.00 150.00 180.34 130.90 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 831.00 150.00 180.34 130.90 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 286.00 300.00 340.53 273.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 286.00 300.00 340.53 273.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,165.00 197.12 218.37 176.61 =============== 603-01365 36 In RCP (CIP) Lin Foot =============================================== PWQM240-172 El Paso County, north Colorad 01/23/20 995.00 205.00 251.00 222.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 2,700.00 300.00 191.49 194.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,695.00 274.42 196.51 201.54 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 13.00 708.75 708.75 708.75 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 6.00 209.28 523.04 523.04 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 19.00 551.02 650.10 650.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,714.00 275.83 196.88 203.83 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 295 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-01420 42 In RCP Lin Foot =============================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 987.00 175.00 206.44 165.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 987.00 175.00 206.44 165.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 987.00 175.00 206.44 165.00 =============== 603-01425 42 In RCP (CIP) Lin Foot =============================================== PWQM240-172 El Paso County, north Colorad 01/23/20 555.00 200.00 305.00 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 555.00 200.00 305.00 250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 555.00 200.00 305.00 250.00 =============== 603-01480 48 In RCP Lin Foot =============================================== NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 50.00 400.00 590.00 590.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 50.00 400.00 590.00 590.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 289.00 220.00 264.42 192.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 289.00 220.00 264.42 192.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 339.00 246.55 271.31 251.13 =============== 603-01485 48 In RCP (CIP) Lin Foot =============================================== PWQM240-172 El Paso County, north Colorad 01/23/20 5,989.00 240.00 400.00 320.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,989.00 240.00 400.00 320.00 IM0761-226 I76/SH52 Interchange 04/02/20 11.00 325.00 627.25 870.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 11.00 325.00 627.25 870.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 296 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-01485 48 In RCP (CIP) Lin Foot =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 166.00 259.24 301.24 301.24 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 166.00 259.24 301.24 301.24 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 18.00 1419.60 1419.60 1419.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 18.00 1419.60 1419.60 1419.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,184.00 244.10 401.59 323.68 =============== 603-01545 54 In RCP (CIP) Lin Foot =============================================== PWQM240-172 El Paso County, north Colorad 01/23/20 553.00 300.00 449.50 379.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 553.00 300.00 449.50 379.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 553.00 300.00 449.50 379.00 =============== 603-01600 60 In RCP Lin Foot =============================================== NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 56.00 500.00 750.00 750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 56.00 500.00 750.00 750.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 56.00 500.00 750.00 750.00 =============== 603-01605 60 In RCP (CIP) Lin Foot =============================================== PWQM240-172 El Paso County, north Colorad 01/23/20 605.00 550.00 588.50 557.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 605.00 550.00 588.50 557.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 554.00 565.35 535.04 535.04 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 554.00 565.35 535.04 535.04 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,159.00 557.34 571.71 546.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 297 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-01665 66 In RCP (CIP) Lin Foot =============================================== PWQM240-172 El Paso County, north Colorad 01/23/20 1,180.00 600.00 667.50 545.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,180.00 600.00 667.50 545.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,180.00 600.00 667.50 545.00 =============== 603-02180 23x14 In RCP Lin Foot =============================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 152.00 175.00 133.38 171.60 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 152.00 175.00 133.38 171.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 152.00 175.00 133.38 171.60 =============== 603-02185 23x14 In RCP (CIP) Lin Foot =============================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 62.00 150.00 154.88 113.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 62.00 150.00 154.88 113.00 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 155.00 230.00 153.93 99.65 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 30.00 125.00 179.71 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 185.00 212.97 159.43 115.92 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 247.00 197.17 158.71 115.19 =============== 603-02245 30x19 In RCP (CIP) Lin Foot =============================================== PWQM240-172 El Paso County, north Colorad 01/23/20 29.00 220.00 181.00 152.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 67.00 160.00 193.15 188.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 96.00 178.13 191.97 177.13 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 114.00 200.00 154.25 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 114.00 200.00 154.25 150.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 210.00 190.00 169.13 162.40 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 298 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-02305 38x24 In RCP (CIP) Lin Foot =============================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 85.00 185.00 180.00 180.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 43.00 180.00 216.91 215.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 128.00 183.32 209.59 191.76 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 120.00 335.00 261.67 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 120.00 335.00 261.67 250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 248.00 256.71 233.35 219.94 =============== 603-02545 68x43 In RCP (CIP) Lin Foot =============================================== PWQM240-172 El Paso County, north Colorad 01/23/20 37.00 600.00 580.00 390.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 37.00 600.00 580.00 390.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 37.00 600.00 580.00 390.00 =============== 603-03360 36 In RCP Spec Lin Foot =============================================== HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 112.00 705.00 363.30 348.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 112.00 705.00 363.30 348.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 112.00 705.00 363.30 348.00 =============== 603-05018 18 In RCES Each =================================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 11.00 1150.00 1627.55 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11.00 1150.00 1627.55 3000.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 22.00 1500.00 1250.37 1204.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 299 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-05018 18 In RCES Each =================================================== FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 22.00 1500.00 1250.37 1204.50 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1.00 1470.00 2041.29 4100.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 2.00 1200.00 1519.58 1894.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 1290.00 1693.48 2629.40 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 2.00 997.50 997.50 997.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 997.50 997.50 997.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 38.00 1355.66 1396.68 1825.85 =============== 603-05024 24 In RCES Each =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 2.00 1300.00 1300.00 1300.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 8.00 3000.00 1340.00 1200.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 8.00 1250.00 1829.13 3200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 18.00 2033.33 1686.94 2100.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 12.00 1700.00 1433.55 1490.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP NH050A-035 US 50A Pueblo Regional Pond 05/28/20 2.00 1000.00 2701.75 5000.00 NH050A-037 US 50A Pueblo Regional Pond -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 14.00 1600.00 1614.72 1991.86 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 6.00 2000.00 2303.00 4400.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 2.00 797.30 1433.87 1433.87 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 1699.33 2263.49 3658.47 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 300 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-05024 24 In RCES Each =================================================== FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 3.00 1155.00 1155.00 1155.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 4.00 1400.00 1237.50 1300.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1.00 584.50 1491.62 1491.62 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8.00 1206.19 1237.74 1269.58 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 48.00 1713.42 1704.10 2189.80 =============== 603-05030 30 In RCES Each =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 7.00 1500.00 1700.00 1700.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 8.00 1500.00 2237.73 3600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15.00 1500.00 2184.71 2713.33 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 11.00 1600.00 1955.94 1770.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 11.00 1600.00 1955.94 1770.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1.00 1500.00 1698.69 1698.69 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1500.00 1698.69 1698.69 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 27.00 1540.74 2071.78 2291.43 =============== 603-05036 36 In RCES Each =================================================== NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 1.00 3000.00 3250.00 3250.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 6.00 1700.00 2764.05 4700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7.00 1885.71 2773.96 4492.86 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 9.00 3500.00 2244.18 2403.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 301 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-05036 36 In RCES Each =================================================== FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 9.00 3500.00 2244.18 2403.50 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 3.00 2500.00 2623.89 2420.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 2500.00 2623.89 2420.30 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1.00 1627.50 1627.50 1627.50 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1.00 1229.00 3566.45 3566.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 1428.25 2596.98 2596.98 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21.00 2621.74 2484.73 3120.78 =============== 603-05042 42 In RCES Each =================================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 8.00 3750.00 2443.23 2596.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 3750.00 2443.23 2596.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 3750.00 2443.23 2596.00 =============== 603-05048 48 In RCES Each =================================================== IM0761-226 I76/SH52 Interchange 04/02/20 3.00 4000.00 2795.46 3218.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 4.00 4000.00 2815.46 2843.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7.00 4000.00 2807.53 3004.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 3.00 1599.70 2437.52 2437.52 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 1599.70 2437.52 2437.52 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 3279.91 2787.71 2834.06 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 302 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-05118 23x14 In RCES Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 4.00 1350.00 1885.38 1918.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 1350.00 1885.38 1918.00 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 1.00 2000.00 2116.00 1290.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1.00 2000.00 2596.00 4400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 2000.00 2396.00 2845.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 1566.67 2140.69 2227.00 =============== 603-05124 30x19 In RCES Each =================================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 2.00 1500.00 2346.44 3500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1500.00 2346.44 3500.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 2.00 1700.00 2641.88 4000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 1700.00 2641.88 4000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 1600.00 2494.16 3750.00 =============== 603-05130 38x24 In RCES Each =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 2.00 1800.00 2200.00 2200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1800.00 2200.00 2200.00 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 4.00 2200.00 3200.00 2600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 2200.00 3200.00 2600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 2066.67 3057.14 2466.67 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 303 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-10120 12 In CSP Lin Foot =============================================== PWQM240-172 El Paso County, north Colorad 01/23/20 61.00 100.00 148.50 137.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 389.00 50.00 118.98 101.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 450.00 56.78 122.98 105.88 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 450.00 56.78 122.98 105.88 =============== 603-10180 18 In CSP Lin Foot =============================================== STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 16.00 125.00 149.00 138.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 160.00 75.00 147.34 102.02 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 28.00 100.00 135.17 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 204.00 82.35 145.71 111.43 STM094A-038 SH94 WB PASSING LANE 09/01/20 83.00 127.70 127.70 127.70 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 78.00 150.00 97.64 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 161.00 138.50 101.61 123.97 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 365.00 107.12 123.07 116.96 =============== 603-10240 24 In CSP Lin Foot =============================================== STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 20.00 20.00 190.00 190.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 64.00 90.00 195.03 110.10 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 34.00 200.00 136.00 130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 118.00 109.83 175.54 129.38 IM0761-226 I76/SH52 Interchange 04/02/20 8.00 100.00 170.88 213.01 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 100.00 170.88 213.01 STM094A-038 SH94 WB PASSING LANE 09/01/20 24.00 239.86 239.86 239.86 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 304 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-10240 24 In CSP Lin Foot =============================================== STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 594.00 100.00 85.34 61.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 618.00 105.43 86.38 68.81 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 744.00 106.07 94.65 79.97 =============== 603-10300 30 In CSP Lin Foot =============================================== STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 90.00 135.00 123.40 160.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 38.00 120.00 212.12 136.36 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 320.00 190.00 93.08 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 448.00 173.01 100.47 100.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 448.00 173.01 100.47 100.85 =============== 603-10360 36 In CSP Lin Foot =============================================== STR2871-038 US 287 Passing Lanes Springfi 03/05/20 24.00 300.00 127.61 145.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 24.00 300.00 127.61 145.00 IM0761-226 I76/SH52 Interchange 04/02/20 39.00 220.00 163.00 151.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 39.00 220.00 163.00 151.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 63.00 250.48 157.71 148.71 =============== 603-10480 48 In CSP Lin Foot =============================================== STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 22.00 150.00 320.00 320.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 22.00 175.00 221.67 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 44.00 162.50 246.25 260.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 72.00 200.00 215.68 215.68 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 72.00 200.00 215.68 215.68 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 116.00 185.78 232.49 232.49 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 305 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-15030 30 In Equiv CSPA Lin Foot =============================================== STR2871-038 US 287 Passing Lanes Springfi 03/05/20 18.00 350.00 109.13 89.99 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 18.00 350.00 109.13 89.99 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18.00 350.00 109.13 89.99 =============== 603-15054 54 In Equiv CSPA Lin Foot =============================================== STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 12.00 200.00 460.00 460.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12.00 200.00 460.00 460.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 200.00 460.00 460.00 =============== 603-30015 15 In SES Each =================================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 3.00 65.34 465.39 465.39 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 65.34 465.39 465.39 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1.00 550.00 404.44 404.44 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 550.00 404.44 404.44 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 186.51 450.15 450.15 =============== 603-30018 18 In SES Each =================================================== NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 13.00 500.00 1021.44 1539.33 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1.00 400.00 905.00 490.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 14.00 492.86 1013.13 1464.38 STM094A-038 SH94 WB PASSING LANE 09/01/20 6.00 421.32 421.32 421.32 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 306 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-30018 18 In SES Each =================================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 2.00 83.34 491.19 491.19 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 336.83 438.79 438.79 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 14.00 400.00 351.67 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 14.00 400.00 351.67 200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 36.00 422.07 564.19 744.77 =============== 603-30024 24 In SES Each =================================================== STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 1.00 1100.00 2300.00 2300.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 7.00 650.00 1117.55 1672.66 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 2.00 500.00 881.67 360.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 665.00 1109.24 1472.86 IM0761-226 I76/SH52 Interchange 04/02/20 1.00 1000.00 849.58 616.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 1000.00 849.58 616.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 2.00 752.92 752.92 752.92 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 17.00 400.00 661.23 226.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 19.00 437.15 662.99 281.47 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 4.00 500.00 861.50 294.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 500.00 861.50 294.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 34.00 528.11 776.89 643.19 =============== 603-30030 30 In SES Each =================================================== STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 2.00 1200.00 971.90 1500.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 307 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-30030 30 In SES Each =================================================== NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 4.00 750.00 1325.73 1927.19 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 900.00 1207.79 1784.79 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 12.00 600.00 1511.17 1370.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 12.00 600.00 1511.17 1370.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18.00 700.00 1450.49 1508.26 =============== 603-30036 36 In SES Each =================================================== IM0761-226 I76/SH52 Interchange 04/02/20 3.00 1050.00 1292.30 1129.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 1050.00 1292.30 1129.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 5.00 1000.00 2918.00 3370.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 1000.00 2918.00 3370.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 1018.75 2248.59 2529.63 =============== 603-30048 48 In SES Each =================================================== STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 1.00 1750.00 7000.00 7000.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1.00 1000.00 1791.67 1700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1375.00 3093.75 4350.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1375.00 3093.75 4350.00 =============== 603-30060 60 In SES Each =================================================== NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 1.00 3000.00 8396.67 8940.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 3000.00 8396.67 8940.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 3000.00 8396.67 8940.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 308 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-31330 30 In Equiv Arch SES Each =================================================== STR2871-038 US 287 Passing Lanes Springfi 03/05/20 1.00 1000.00 979.22 1016.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1000.00 979.22 1016.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1000.00 979.22 1016.00 =============== 603-31354 54 In Equiv Arch SES Each =================================================== STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 1.00 200.00 8000.00 8000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 200.00 8000.00 8000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 200.00 8000.00 8000.00 =============== 603-31454 54 In Traversable Equiv Arch SES Each =================================================== STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 2.00 1200.00 10000.00 10000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1200.00 10000.00 10000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1200.00 10000.00 10000.00 =============== 603-33024 24 In Pipe Safety End Treat Each =================================================== STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 1.00 1000.00 2000.00 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1000.00 2000.00 2000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1000.00 2000.00 2000.00 =============== 603-33048 48 In Pipe Safety End Treat Each =================================================== STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 2.00 1000.00 3200.00 3200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1000.00 3200.00 3200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1000.00 3200.00 3200.00 =============== 603-50003 3 In Plastic Pipe Lin Foot =============================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 160.00 20.00 30.00 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 160.00 20.00 30.00 30.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 160.00 20.00 30.00 30.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 309 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-50004 4 In Plastic Pipe Lin Foot =============================================== NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 158.00 85.00 49.38 49.38 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 158.00 85.00 49.38 49.38 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 158.00 85.00 49.38 49.38 =============== 603-50012 12 In Plastic Pipe Lin Foot =============================================== IM0761-226 I76/SH52 Interchange 04/02/20 10.00 100.00 207.76 155.01 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 100.00 207.76 155.01 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 100.00 207.76 155.01 =============== 603-50015 15 In Plastic Pipe Lin Foot =============================================== NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 196.00 109.00 82.97 82.97 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 196.00 109.00 82.97 82.97 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 379.00 92.56 86.57 86.57 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 379.00 92.56 86.57 86.57 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1,475.00 70.04 72.03 72.03 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,475.00 70.04 72.03 72.03 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,050.00 77.93 75.76 75.76 =============== 603-50018 18 In Plastic Pipe Lin Foot =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 224.00 106.10 126.87 126.87 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 224.00 106.10 126.87 126.87 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 310 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-50018 18 In Plastic Pipe Lin Foot =============================================== NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 73.00 96.84 136.29 136.29 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 73.00 96.84 136.29 136.29 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 297.00 103.82 129.19 129.19 =============== 603-50036 36 In Plastic Pipe Lin Foot =============================================== PWQM240-172 El Paso County, north Colorad 01/23/20 6.00 500.00 474.50 269.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 500.00 474.50 269.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 176.00 410.02 423.17 423.17 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 176.00 410.02 423.17 423.17 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 182.00 412.99 426.45 418.09 =============== 603-70504 5x4 Ft CBC (Precast) Lin Foot =============================================== NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 64.00 1000.00 1350.00 1350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 64.00 1000.00 1350.00 1350.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 64.00 1000.00 1350.00 1350.00 =============== 603-70605 6x5 Ft CBC (Precast) Lin Foot =============================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 460.00 800.00 1093.67 875.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 460.00 800.00 1093.67 875.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 460.00 800.00 1093.67 875.00 =============== 603-70606 6x6 Ft CBC (Precast) Lin Foot =============================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 180.00 1400.00 948.56 781.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 311 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-70606 6x6 Ft CBC (Precast) Lin Foot =============================================== FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 180.00 1400.00 948.56 781.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 180.00 1400.00 948.56 781.00 =============== 603-70607 6x7 Ft CBC (Precast) Lin Foot =============================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 144.00 1800.00 1039.72 918.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 144.00 1800.00 1039.72 918.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 144.00 1800.00 1039.72 918.50 =============== 603-70808 8x8 Ft CBC (Precast) Lin Foot =============================================== NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 145.00 1600.00 1665.83 1430.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 145.00 1600.00 1665.83 1430.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 145.00 1600.00 1665.83 1430.00 =============== 603-71006 10x6 Ft CBC (Precast) Lin Foot =============================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 179.00 2300.00 1319.48 1320.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 179.00 2300.00 1319.48 1320.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 179.00 2300.00 1319.48 1320.00 =============== 603-71010 10x10 Ft CBC (Precast) Lin Foot =============================================== NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 130.00 2200.00 1780.00 1750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 130.00 2200.00 1780.00 1750.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 130.00 2200.00 1780.00 1750.00 =============== 603-71206 12x6 Ft CBC (Precast) Lin Foot =============================================== NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 223.00 1320.63 1450.61 1450.61 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 223.00 1320.63 1450.61 1450.61 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 223.00 1320.63 1450.61 1450.61 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 312 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-71408 14x8 Ft CBC (Precast) Lin Foot =============================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 132.00 2800.00 2331.78 2640.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 132.00 2800.00 2331.78 2640.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 132.00 2800.00 2331.78 2640.00 =============== 603-72100 CBC Wingwall (Precast) Each =================================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 2.00 6500.00 16116.73 16000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 6500.00 16116.73 16000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 6500.00 16116.73 16000.00 =============== 603-73713 37x13 Ft Conc 3-S Culv (Precast) Lin Foot =============================================== NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 78.00 5000.00 5574.04 5750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 78.00 5000.00 5574.04 5750.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 78.00 5000.00 5574.04 5750.00 =============== 603-77001 Culv Headwall (3-S Culv)(Ty1) Sq Foot ================================================ NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 1,408.00 74.00 76.53 65.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,408.00 74.00 76.53 65.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,408.00 74.00 76.53 65.15 =============== 603-77002 Culv Headwall (3-S Culv)(Ty 2) Sq Foot ================================================ NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 642.00 95.00 87.76 105.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 642.00 95.00 87.76 105.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 642.00 95.00 87.76 105.45 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 313 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-77011 Culv Wingwall (3-S Culv)(Ty 1) Sq Foot ================================================ NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 2,555.00 60.00 70.45 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,555.00 60.00 70.45 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,555.00 60.00 70.45 50.00 =============== 603-77012 Culv Wingwall (3-S Culv)(Ty 2) Sq Foot ================================================ NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 2,341.00 65.00 71.31 51.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,341.00 65.00 71.31 51.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,341.00 65.00 71.31 51.40 =============== 603-77224 72x24 Ft Conc 3-S Culv (Precast) Lin Foot =============================================== NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 100.00 14000.00 13493.89 13500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 100.00 14000.00 13493.89 13500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 100.00 14000.00 13493.89 13500.00 =============== 603-85095 Precast Concrete Arch Bridge System LUMP SUM =============================================== NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 1.00 150000.00 266036.67 218200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 150000.00 266036.67 218200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 150000.00 266036.67 218200.00 =============== 604-00305 Inlet Ty C (5 Ft) Each =================================================== PWQM240-172 El Paso County, north Colorad 01/23/20 1.00 6000.00 5536.00 4672.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 3.00 5000.00 4858.33 6400.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 3.00 4500.00 4902.79 5700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7.00 4928.57 4927.54 5853.14 IM0761-226 I76/SH52 Interchange 04/02/20 2.00 5000.00 4550.77 5713.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 314 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-00305 Inlet Ty C (5 Ft) Each =================================================== SFTY2254-091 225 Ramp Improvements 04/09/20 1.00 5000.00 5780.00 7360.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 4000.00 4583.19 2216.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 4750.00 4664.01 5250.63 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 1.00 4100.00 7148.50 9297.00 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 2.00 5500.00 4180.00 2470.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 5.00 3892.56 4334.50 4334.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 4320.35 4574.68 4488.69 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 1.00 4200.00 8247.50 8495.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 19.00 3770.88 4624.33 4624.33 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 20.00 3792.34 4969.39 4817.86 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 39.00 4202.81 4809.56 4980.55 =============== 604-00310 Inlet Ty C (10 Ft) Each =================================================== PWQM240-172 El Paso County, north Colorad 01/23/20 11.00 7500.00 8848.50 6697.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11.00 7500.00 8848.50 6697.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 9.00 5156.65 5839.87 5839.87 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9.00 5156.65 5839.87 5839.87 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 6445.49 7975.03 6311.29 =============== 604-00315 Inlet Ty C (15 Ft) Each =================================================== PWQM240-172 El Paso County, north Colorad 01/23/20 3.00 10500.00 11343.50 8687.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 10500.00 11343.50 8687.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 10500.00 11343.50 8687.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 315 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-00350 Inlet Ty C (Spec) Each =================================================== NH050A-035 US 50A Pueblo Regional Pond 05/28/20 2.00 3500.00 10058.50 10000.00 NH050A-037 US 50A Pueblo Regional Pond -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 3500.00 10058.50 10000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 3500.00 10058.50 10000.00 =============== 604-00505 Inlet Ty D (5 Ft) Each =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 1.00 5000.00 5800.00 5800.00 PWQM240-172 El Paso County, north Colorad 01/23/20 1.00 6500.00 6560.50 5921.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 5750.00 6307.00 5860.50 IM0761-226 I76/SH52 Interchange 04/02/20 2.00 7000.00 5435.64 10015.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 5400.00 5897.04 3300.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 6466.67 5603.42 7776.67 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 5427.94 5627.89 5627.89 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 5427.94 5627.89 5627.89 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 4.00 4672.26 5571.28 5571.28 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 4672.26 5571.28 5571.28 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 5501.70 5670.31 6296.40 =============== 604-00506 Inlet Ty D (Spec) (5 Ft) Each =================================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 12.00 7000.00 7918.75 8000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12.00 7000.00 7918.75 8000.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 316 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-00506 Inlet Ty D (Spec) (5 Ft) Each =================================================== SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1.00 7000.00 21100.00 30000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 7000.00 21100.00 30000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13.00 7000.00 8814.56 9692.31 =============== 604-00510 Inlet Ty D (10 Ft) Each =================================================== PWQM240-172 El Paso County, north Colorad 01/23/20 12.00 8500.00 9930.00 7860.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 1.00 6000.00 8250.00 8250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 13.00 8307.69 9862.80 7890.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1.00 5277.00 5865.79 5865.79 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 5277.00 5865.79 5865.79 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 8091.21 9709.07 7745.41 =============== 604-00511 Inlet Ty D (Spec) (10 Ft) Each =================================================== PWQM240-172 El Paso County, north Colorad 01/23/20 2.00 25000.00 50431.50 24863.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 3.00 7000.00 9863.33 13100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 14200.00 22345.85 17805.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 14200.00 22345.85 17805.20 =============== 604-00515 Inlet Ty D (15 Ft) Each =================================================== PWQM240-172 El Paso County, north Colorad 01/23/20 3.00 11500.00 13108.50 10217.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 11500.00 13108.50 10217.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 11500.00 13108.50 10217.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 317 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-00520 Inlet Ty D (20 Ft) Each =================================================== PWQM240-172 El Paso County, north Colorad 01/23/20 2.00 13500.00 17870.00 12740.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 13500.00 17870.00 12740.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 13500.00 17870.00 12740.00 =============== 604-00610 Inlet Ty D (D) (10 Ft) Each =================================================== NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1.00 9100.00 9015.61 9015.61 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 9100.00 9015.61 9015.61 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 9100.00 9015.61 9015.61 =============== 604-13005 Inlet Ty 13 (5 Ft) Each =================================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1.00 4800.00 4771.28 5800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 4800.00 4771.28 5800.00 IM0761-226 I76/SH52 Interchange 04/02/20 1.00 5000.00 4874.60 5751.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 3.00 3500.00 5931.67 3430.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 3875.00 5469.20 4010.25 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 2.00 5000.00 4198.00 3430.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 5000.00 4198.00 3430.00 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 1.00 6500.00 4950.00 3500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 6500.00 4950.00 3500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 4600.00 4932.63 4025.13 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 318 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-13015 Inlet Ty 13 (15 Ft) Each =================================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1.00 7000.00 7930.62 12500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 7000.00 7930.62 12500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 7000.00 7930.62 12500.00 =============== 604-16005 Inlet Ty 16 (5 Ft) Each =================================================== IM0761-226 I76/SH52 Interchange 04/02/20 1.00 6000.00 6260.06 5422.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 2.00 4500.00 6178.67 3760.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 5000.00 6222.49 4314.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 2.00 5000.00 8497.50 8495.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 5000.00 8497.50 8495.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 5000.00 6757.79 5986.40 =============== 604-16010 Inlet Ty 16 (10 Ft) Each =================================================== IM0761-226 I76/SH52 Interchange 04/02/20 1.00 7000.00 7142.93 6914.01 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 7000.00 7142.93 6914.01 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 7000.00 7142.93 6914.01 =============== 604-16050 Inlet Ty 16 (S) (Spec) Each =================================================== HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 6.00 5000.00 3221.13 2889.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 5000.00 3221.13 2889.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 2.00 9000.00 7400.00 9800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 9000.00 7400.00 9800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 6000.00 4265.84 4616.75 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 319 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-16505 Inlet Ty 16 (D) (5 Ft) Each =================================================== NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 1.00 8000.00 12872.50 13745.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 8000.00 12872.50 13745.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 8000.00 12872.50 13745.00 =============== 604-16510 Inlet Ty 16 (D) (10 Ft) Each =================================================== STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 1.00 8000.00 8440.66 5780.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 8000.00 8440.66 5780.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 8000.00 8440.66 5780.00 =============== 604-16515 Inlet Ty 16 (D) (15 Ft) Each =================================================== STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 1.00 9000.00 11229.15 8000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 9000.00 11229.15 8000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 9000.00 11229.15 8000.00 =============== 604-19105 Inlet Ty R L5 (5 Ft) Each =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 1.00 6000.00 7250.00 7250.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 8.00 5000.00 9073.33 10600.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1.00 5000.00 6237.39 7000.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1.00 5000.00 5795.75 4679.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1.00 3000.00 7284.00 8660.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12.00 4916.67 8073.02 9365.75 IM0761-226 I76/SH52 Interchange 04/02/20 3.00 5000.00 7462.23 7069.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 33.00 4500.00 6616.40 5747.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 36.00 4541.67 6678.72 5857.63 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 320 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-19105 Inlet Ty R L5 (5 Ft) Each =================================================== SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 1.00 5500.00 9500.00 12000.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1.00 7500.00 6191.28 6500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 6500.00 6926.55 9250.00 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 1.00 6500.00 4993.33 3500.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 10.00 6358.85 7720.86 7720.86 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 11.00 6371.68 7091.43 7337.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 61.00 5009.65 6861.34 6925.77 =============== 604-19110 Inlet Ty R L5 (10 Ft) Each =================================================== PWQM240-172 El Paso County, north Colorad 01/23/20 1.00 10500.00 11609.50 10219.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 10.00 7000.00 11490.00 13300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11.00 7318.18 11497.47 13019.91 IM0761-226 I76/SH52 Interchange 04/02/20 3.00 6500.00 8482.00 8974.69 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 9.00 7000.00 7398.19 5775.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 1.00 6000.00 8671.67 7180.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 13.00 6807.69 7675.07 6621.47 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1.00 6500.00 7471.71 8500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 6500.00 7471.71 8500.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 7.00 7531.32 8556.37 8556.37 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 7.00 7531.32 8556.37 8556.37 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 32.00 7131.85 8569.88 9302.90 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 321 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-19115 Inlet Ty R L5 (15 Ft) Each =================================================== IM0761-226 I76/SH52 Interchange 04/02/20 1.00 9000.00 9942.52 12301.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 2.00 7500.00 9678.15 6149.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 8000.00 9758.61 8199.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 8000.00 9758.61 8199.67 =============== 604-19205 Inlet Ty R L10 (5 Ft) Each =================================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 2.00 6500.00 8954.22 9500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 6500.00 8954.22 9500.00 IM0761-226 I76/SH52 Interchange 04/02/20 3.00 6500.00 10025.53 10724.99 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 6500.00 10025.53 10724.99 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1.00 7000.00 9125.42 9500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 7000.00 9125.42 9500.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 1.00 9000.00 14147.50 14795.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 6.00 8937.37 10318.53 10318.53 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 7.00 8946.32 11275.77 10958.03 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13.00 7855.71 9767.07 10567.78 =============== 604-19210 Inlet Ty R L10 (10 Ft) Each =================================================== PWQM240-172 El Paso County, north Colorad 01/23/20 1.00 12500.00 15726.00 15452.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1.00 11000.00 15941.67 17000.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 322 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-19210 Inlet Ty R L10 (10 Ft) Each =================================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1.00 8500.00 11485.34 12500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 10666.67 13166.13 14984.00 IM0761-226 I76/SH52 Interchange 04/02/20 1.00 7000.00 11514.56 13152.97 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 7000.00 11514.56 13152.97 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 2.00 11944.68 13098.13 13098.13 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 11944.68 13098.13 13098.13 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 10481.56 12634.45 14050.21 =============== 604-19305 Inlet Ty R L15 (5 Ft) Each =================================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1.00 12500.00 11588.62 10000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 12500.00 11588.62 10000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 12500.00 11588.62 10000.00 =============== 604-19310 Inlet Ty R L15 (10 Ft) Each =================================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1.00 15000.00 14617.11 16000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 15000.00 14617.11 16000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 15000.00 14617.11 16000.00 =============== 604-19405 Inlet Ty R Spec (5 Ft) Each =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 11.00 7000.00 7500.00 7500.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1.00 8000.00 8677.40 7625.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12.00 7083.33 7681.14 7510.42 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 323 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-19405 Inlet Ty R Spec (5 Ft) Each =================================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 30.00 5000.00 7784.50 8717.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 30.00 5000.00 7784.50 8717.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 42.00 5595.24 7779.18 8372.62 =============== 604-19410 Inlet Ty R Spec (10 Ft) Each =================================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 15.00 6000.00 8949.72 8800.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 15.00 6000.00 8949.72 8800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15.00 6000.00 8949.72 8800.00 =============== 604-19415 Inlet Ty R Spec (15 Ft) Each =================================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 8000.00 12546.07 9130.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 8000.00 12546.07 9130.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 8000.00 12546.07 9130.00 =============== 604-19724 Inlet Spec (Trench) (24 Inch) Lin Foot =============================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 22.00 500.00 1800.00 1800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 22.00 500.00 1800.00 1800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 22.00 500.00 1800.00 1800.00 =============== 604-20000 Outlet Structure Each =================================================== NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1.00 25752.47 34294.73 34294.73 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 25752.47 34294.73 34294.73 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 25752.47 34294.73 34294.73 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 324 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-25000 Vane Grate Inlet Spec Each =================================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 2.00 8000.00 8800.56 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 8000.00 8800.56 5000.00 IM0761-226 I76/SH52 Interchange 04/02/20 2.00 6000.00 7330.08 8910.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 2.00 10000.00 8818.90 6484.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 8000.00 8124.12 7697.25 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 12.00 3839.06 8135.76 8135.76 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.00 3839.06 8135.76 8135.76 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 2.00 12589.50 12589.50 12589.50 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1.00 7432.16 9459.07 9459.07 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 10870.39 11546.02 11546.02 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21.00 6032.38 8472.12 8240.77 =============== 604-25005 Vane Grate Inlet (5 Ft) Each =================================================== SFTY2254-091 225 Ramp Improvements 04/09/20 1.00 5000.00 6900.00 7800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 5000.00 6900.00 7800.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 2.00 7310.51 10395.44 10395.44 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 7310.51 10395.44 10395.44 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 6540.34 8647.72 9530.29 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 325 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-25010 Vane Grate Inlet (10 Ft) Each =================================================== NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1.00 9401.33 11852.48 11852.48 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 9401.33 11852.48 11852.48 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 9401.33 11852.48 11852.48 =============== 604-26005 Vane Grate Inlet (D) (5 Ft) Each =================================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 8.00 6000.00 7071.02 7500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 6000.00 7071.02 7500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 6000.00 7071.02 7500.00 =============== 604-26010 Vane Grate Inlet (D) (10 Ft) Each =================================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 2.00 8000.00 8349.50 10500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 8000.00 8349.50 10500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 8000.00 8349.50 10500.00 =============== 604-30000 MH Slab Base (Spec) Each =================================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 10.00 5000.00 12426.67 11800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 5000.00 12426.67 11800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 5000.00 12426.67 11800.00 =============== 604-30005 MH Slab Base (5 Ft) Each =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 2.00 4500.00 13000.00 13000.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1.00 4000.00 4205.28 2250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 4333.33 8602.64 9416.67 IM0761-226 I76/SH52 Interchange 04/02/20 2.00 4000.00 5812.06 5606.01 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 326 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-30005 MH Slab Base (5 Ft) Each =================================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 5100.00 5922.60 4730.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 1.00 4500.00 6585.67 3890.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1.00 4500.00 4656.01 4656.01 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 4420.00 5890.87 4897.61 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 1.00 5000.00 7006.55 4280.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 5.00 4953.68 7239.62 7239.62 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 4961.40 7112.49 6746.35 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 1.00 6000.00 7672.50 5345.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 6000.00 7672.50 5345.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15.00 4724.56 6538.50 6570.74 =============== 604-30010 MH Slab Base (10 Ft) Each =================================================== PWQM240-172 El Paso County, north Colorad 01/23/20 3.00 7500.00 10076.00 8152.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 7.00 6000.00 5733.33 7000.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 10.00 7500.00 6216.99 8000.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 4.00 5000.00 5453.55 3050.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 24.00 6645.83 6276.90 6902.33 IM0761-226 I76/SH52 Interchange 04/02/20 5.00 5500.00 5859.78 5973.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 2.00 5000.00 6484.90 5280.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 1.00 6000.00 8017.33 4160.00 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 8.00 8500.00 6269.00 5000.00 NH050A-037 US 50A Pueblo Regional Pond -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16.00 6968.75 6221.34 5286.56 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 2.00 6136.91 7703.96 7703.96 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 6136.91 7703.96 7703.96 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 327 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-30010 MH Slab Base (10 Ft) Each =================================================== NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 14.00 5247.23 5873.91 5873.91 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 14.00 5247.23 5873.91 5873.91 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 56.00 6370.27 6239.38 6212.21 =============== 604-30015 MH Slab Base (15 Ft) Each =================================================== PWQM240-172 El Paso County, north Colorad 01/23/20 14.00 9500.00 12010.50 11021.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 4.00 8000.00 9142.65 10500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 18.00 9166.67 10480.98 10905.22 IM0761-226 I76/SH52 Interchange 04/02/20 1.00 6600.00 7435.50 5628.01 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 2.00 7200.00 7976.34 6561.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1.00 7500.00 8655.43 8655.43 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 7125.00 7846.89 6851.61 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 4.00 6056.05 6569.59 6569.59 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 6056.05 6569.59 6569.59 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26.00 8374.01 9584.80 9614.57 =============== 604-30020 MH Slab Base (20 Ft) Each =================================================== PWQM240-172 El Paso County, north Colorad 01/23/20 5.00 12000.00 14603.00 13206.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 12000.00 14603.00 13206.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 12000.00 14603.00 13206.00 =============== 604-30025 MH Slab Base (25 Ft) Each =================================================== PWQM240-172 El Paso County, north Colorad 01/23/20 4.00 13500.00 18280.00 18560.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 13500.00 18280.00 18560.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 13500.00 18280.00 18560.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 328 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-30030 MH Slab Base (30 Ft) Each =================================================== PWQM240-172 El Paso County, north Colorad 01/23/20 1.00 20000.00 19601.50 17203.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 20000.00 19601.50 17203.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 20000.00 19601.50 17203.00 =============== 604-31010 MH Box Base (10 Ft) Each =================================================== PWQM240-172 El Paso County, north Colorad 01/23/20 5.00 8500.00 19401.50 17803.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1.00 10000.00 15167.80 9339.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 8750.00 17990.27 16392.33 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 4.00 10000.00 12786.36 9025.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 10000.00 12786.36 9025.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 9250.00 14447.18 13445.60 =============== 604-31015 MH Box Base (15 Ft) Each =================================================== PWQM240-172 El Paso County, north Colorad 01/23/20 8.00 10500.00 20994.50 19989.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1.00 10000.00 15942.37 16000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9.00 10444.44 19310.46 19545.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 10444.44 19310.46 19545.78 =============== 604-31020 MH Box Base (20 Ft) Each =================================================== PWQM240-172 El Paso County, north Colorad 01/23/20 6.00 12500.00 25177.00 25354.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 12500.00 25177.00 25354.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 12500.00 25177.00 25354.00 =============== 604-31030 MH Box Base (30 Ft) Each =================================================== PWQM240-172 El Paso County, north Colorad 01/23/20 3.00 20000.00 29384.50 26769.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 20000.00 29384.50 26769.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 20000.00 29384.50 26769.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 329 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-39000 MH Spec Each =================================================== ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 1.00 18000.00 4073.20 2200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 18000.00 4073.20 2200.00 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 87.00 5000.00 7842.92 3955.93 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 87.00 5000.00 7842.92 3955.93 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 88.00 5147.73 7772.06 3935.98 =============== 604-39050 MH (TMS) Each =================================================== ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 13.00 7000.00 7225.00 7427.70 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1.00 5000.00 12513.22 13500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 14.00 6857.14 7804.53 7861.44 IM0761-226 I76/SH52 Interchange 04/02/20 3.00 7000.00 7152.44 6857.14 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 7.00 20000.00 6485.41 6853.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 2.00 7300.00 7308.10 7308.10 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 3.00 9000.00 11416.08 7500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 15.00 13506.67 7438.74 7043.91 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 2.00 7000.00 11257.70 12000.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 2.00 8500.00 9095.00 9095.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 7750.00 10948.74 10547.50 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 38.00 7000.00 6492.73 7000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 38.00 7000.00 6492.73 7000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 71.00 8388.73 7096.82 7379.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 330 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-51012 12 In Slot Pipe Inlet Lin Foot =============================================== HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 100.00 50.00 304.18 290.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 100.00 50.00 304.18 290.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 100.00 50.00 304.18 290.00 =============== 604-51015 15 In Slot Pipe Inlet Lin Foot =============================================== NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 27.00 8900.00 707.85 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 27.00 8900.00 707.85 400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 27.00 8900.00 707.85 400.00 =============== 605-00040 4 In PP Underdrain Lin Foot =============================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 318.00 50.00 29.83 19.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 318.00 50.00 29.83 19.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 318.00 50.00 29.83 19.00 =============== 605-00060 6 In PP Underdrain Lin Foot =============================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 208.00 40.00 45.99 52.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 208.00 40.00 45.99 52.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 382.00 25.00 24.17 18.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 382.00 25.00 24.17 18.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 590.00 30.29 33.35 30.37 =============== 605-01030 3 In Hor Drain Lin Foot =============================================== NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 1,000.00 50.00 49.77 55.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,000.00 50.00 49.77 55.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,000.00 50.00 49.77 55.30 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 331 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 605-17000 Vert Drain Wick Lin Foot =============================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 254,536.00 1.15 0.77 0.73 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 254,536.00 1.15 0.77 0.73 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 254,536.00 1.15 0.77 0.73 =============== 605-83001 Geocomp Drain (w/o Pipe) Sq Yard ================================================ CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 216.00 40.00 21.35 30.20 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 216.00 40.00 21.35 30.20 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 8.00 95.00 305.60 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8.00 95.00 305.60 60.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 224.00 41.96 27.78 31.26 =============== 605-83500 Geocomp Underdrain Lin Foot =============================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 866.00 45.00 49.67 13.20 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 866.00 45.00 49.67 13.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 866.00 45.00 49.67 13.20 =============== 606-00301 Gdrail Ty 3 (6-3) Lin Foot =============================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 575.00 45.00 32.10 30.00 STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 5,000.00 40.00 22.50 21.00 STR141A-044 SH 141 AND SH 145, FROM SLICK 01/30/20 5,800.00 27.00 23.09 21.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 1,000.00 35.00 31.00 28.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 1,100.00 32.00 33.90 37.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 650.00 32.00 34.14 37.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 864.00 40.00 30.71 32.88 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 332 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-00301 Gdrail Ty 3 (6-3) Lin Foot =============================================== C0641-106 SH 64 Meeker West Rural Resur 03/05/20 2,472.00 50.00 30.40 32.50 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 50.00 10950.00 60.00 60.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 100.00 30.00 73.05 62.01 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 290.00 45.00 29.50 32.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 17,901.00 66.77 26.29 25.92 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 5,350.00 30.00 27.65 24.50 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 3,246.00 40.00 41.99 38.60 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 3,125.00 45.00 25.09 22.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 1,287.50 70.00 42.00 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 13,008.50 40.06 30.75 29.45 STR184B-006 CULVERTS SH 184 08/06/20 200.00 45.00 32.00 32.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 2,975.00 22.00 21.79 21.05 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 131.25 30.00 28.94 28.94 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,306.25 23.71 21.93 22.03 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 2,850.00 45.00 44.77 39.30 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 13,497.00 50.00 40.25 40.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 3,926.00 40.00 26.93 33.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 7,925.00 40.00 24.13 31.40 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 33,720.50 19.80 21.19 21.19 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 61,918.50 31.41 29.37 28.18 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 96,134.25 38.90 28.43 27.72 =============== 606-00302 Gdrail Ty 3 (31 In MGS) Lin Foot =============================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 22,924.00 32.00 21.35 22.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 388.00 40.00 36.21 31.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 21,232.00 22.00 39.96 36.91 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 333 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-00302 Gdrail Ty 3 (31 In MGS) Lin Foot =============================================== STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 256.00 60.00 71.75 74.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 6,887.50 25.00 29.45 32.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 3,087.50 32.00 28.70 27.35 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 363.00 50.00 54.33 55.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 7,663.00 24.00 22.09 22.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 62,801.00 27.14 26.92 28.90 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 7,557.00 42.00 60.14 46.02 IM0761-226 I76/SH52 Interchange 04/02/20 587.50 25.00 31.92 30.69 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 2,069.00 30.00 29.45 28.89 SFTY2254-091 225 Ramp Improvements 04/09/20 1,935.00 50.00 29.50 29.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 12.50 50.00 134.67 147.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 525.00 40.00 34.95 31.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12,686.00 40.40 48.06 39.40 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 1,550.00 38.27 42.43 45.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1,102.00 25.00 28.38 26.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 700.00 25.00 27.27 36.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,352.00 31.14 35.35 36.96 MPC040-061 R2 FY 21 Sign Replacement 10/01/20 188.00 43.34 89.00 70.00 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 112.50 35.00 138.18 81.16 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 6,672.00 45.00 30.50 30.00 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 795.00 50.00 40.90 41.43 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 23,254.00 40.00 38.30 34.27 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 220.00 60.00 52.00 52.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1,038.00 28.63 28.63 28.63 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 32,279.50 41.05 37.23 33.87 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 111,118.50 32.82 32.55 31.78 =============== 606-00350 Gdrail Ty 3 (D) (6-3) Lin Foot =============================================== NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 1,905.00 55.00 73.36 70.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,905.00 55.00 73.36 70.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,905.00 55.00 73.36 70.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 334 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-00710 Gdrail Ty 7 (Sty CA) Lin Foot =============================================== NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 400.00 130.00 134.00 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 400.00 130.00 134.00 140.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 10.00 125.00 591.33 550.00 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 50.00 129.00 62.00 53.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 60.00 128.33 131.04 135.83 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 460.00 129.78 133.70 139.46 =============== 606-00900 Gdrail (Spec) Lin Foot =============================================== NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 575.00 250.00 145.00 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 575.00 250.00 145.00 150.00 IM0761-226 I76/SH52 Interchange 04/02/20 490.00 300.00 511.49 375.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 490.00 300.00 511.49 375.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,065.00 273.00 344.37 253.52 =============== 606-00910 Guardrail Type 9 (Style CA) Lin Foot =============================================== NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 24.00 150.00 210.00 120.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1,487.00 130.00 164.67 150.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1,542.00 125.00 118.35 100.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,053.00 127.63 130.88 124.71 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 420.00 150.00 197.95 107.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 420.00 150.00 197.95 107.65 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 335 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-00910 Guardrail Type 9 (Style CA) Lin Foot =============================================== NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 60.00 160.00 284.33 250.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 2,348.03 152.28 157.51 157.51 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,408.03 152.47 166.54 159.81 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,881.03 139.40 143.76 137.87 =============== 606-00920 Guardrail Type 9 (Style CC) Lin Foot =============================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 271.00 125.00 122.73 100.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 271.00 125.00 122.73 100.40 SFTY2254-091 225 Ramp Improvements 04/09/20 1,128.00 250.00 146.25 92.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,128.00 250.00 146.25 92.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,399.00 225.79 134.72 94.03 =============== 606-00930 Guardrail Type 9 (Style CD) Lin Foot =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 380.00 120.00 128.40 128.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 380.00 120.00 128.40 128.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 380.00 120.00 128.40 128.40 =============== 606-01320 End Anchor Ty 3B Each =================================================== STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 2.00 2000.00 2662.50 2775.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 2000.00 2662.50 2775.00 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 2.00 2500.00 5518.33 6030.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 2500.00 5518.33 6030.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 2250.00 4376.00 4402.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 336 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-01340 End Anchor Ty 3D Each =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 1.00 1350.00 1434.58 1320.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 24.00 1500.00 1416.67 2370.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 1.00 1500.00 2221.27 2442.54 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 2.00 1520.00 1324.43 915.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 1.00 1500.00 2887.59 3128.61 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 2.00 1500.00 2196.67 2100.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 9.00 1600.00 1659.87 1700.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1.00 2200.00 1372.60 1260.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 41.00 1536.34 1609.59 2106.37 IM0761-226 I76/SH52 Interchange 04/02/20 4.00 1000.00 1073.48 1054.70 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 3.00 1500.00 1683.34 1666.67 SFTY2254-091 225 Ramp Improvements 04/09/20 2.00 1750.00 1375.00 1350.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 5.00 2100.00 1429.13 1094.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 1.00 3000.00 3094.67 2750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 15.00 1700.00 1384.03 1342.75 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 2.00 2000.00 993.57 920.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 2000.00 993.57 920.00 MPC040-061 R2 FY 21 Sign Replacement 10/01/20 1.00 1478.51 4500.00 2500.00 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 1.00 3000.00 5639.33 2638.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 14.00 1600.00 2095.00 985.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 7.00 2200.00 2701.86 1390.00 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 4.00 1500.00 2740.83 4992.76 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 11.00 2000.00 3643.42 2490.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 1.00 1600.00 3012.50 3025.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 3.00 1122.12 1122.12 1122.12 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 30.00 883.25 945.08 945.08 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 72.00 1413.09 2442.66 1538.37 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 130.00 1494.10 1841.32 1685.43 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 337 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-01370 Transition Ty 3G Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 36.00 2500.00 2308.00 2619.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 8.00 2500.00 2628.06 2300.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 7.00 2100.00 4048.31 3596.61 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 1.00 4000.00 7175.02 7400.03 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 16.00 2500.00 2400.00 2200.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 11.00 2500.00 2393.97 2600.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 8.00 2000.00 2630.59 2700.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 2.00 5000.00 4633.33 4500.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 4.00 2500.00 2443.52 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 93.00 2496.77 2586.91 2684.52 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 9.00 2800.00 5449.85 3790.01 IM0761-226 I76/SH52 Interchange 04/02/20 5.00 2000.00 2502.04 2453.90 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 4.00 3500.00 3243.10 2880.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 5.00 3500.00 2836.11 2772.22 SFTY2254-091 225 Ramp Improvements 04/09/20 1.00 3500.00 3430.00 3360.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 2.00 4500.00 2628.20 2629.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 4.00 2500.00 3049.10 2900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 30.00 2973.33 3335.54 3065.96 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 8.00 3800.00 3004.21 3209.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 3800.00 3004.21 3209.50 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 29.00 4000.00 5000.00 4500.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 10.00 2500.00 3206.67 2760.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 6.00 5000.00 4876.45 4245.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 4.00 4600.00 3575.64 5500.00 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 2.00 3700.00 4502.03 6076.95 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 4.00 3416.22 3416.22 3416.22 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 31.00 2187.82 2340.97 2340.97 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 86.00 3235.90 4100.69 3534.41 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 217.00 2903.63 3212.10 3093.43 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 338 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-01371 Transition Ty 3G (Spec) Each =================================================== NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 1.00 2500.00 4504.58 4509.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 2500.00 4504.58 4509.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2500.00 4504.58 4509.15 =============== 606-01380 Transition Ty 3H Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 20.00 2000.00 867.00 924.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 1.00 2000.00 5161.41 5322.82 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 2.00 2000.00 2443.33 2400.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 2.00 1500.00 1503.26 1525.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1.00 2500.00 1296.00 1210.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 26.00 1980.77 1208.26 1263.95 IM0761-226 I76/SH52 Interchange 04/02/20 4.00 1300.00 1113.37 1086.50 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 4.00 2300.00 2078.73 1530.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 4.00 1900.00 2077.78 2055.56 SFTY2254-091 225 Ramp Improvements 04/09/20 1.00 3500.00 1400.00 1400.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 2.00 2000.00 1328.69 1072.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 15.00 1966.67 1501.65 1482.22 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 5.00 1500.00 1711.67 1315.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 4.00 3000.00 2257.50 1960.00 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 2.00 2500.00 2980.50 2200.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 13.00 1000.00 1070.00 1070.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 24.00 1562.50 1838.22 1363.54 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 65.00 1823.08 1449.80 1351.09 =============== 606-01385 Transition Ty 3J Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 3.00 2000.00 2105.33 2370.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 339 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-01385 Transition Ty 3J Each =================================================== BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 1.00 1775.00 2072.56 1500.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 6.00 1600.00 953.24 1000.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 6.00 2000.00 1377.13 2200.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 1.00 2250.00 2585.52 3540.00 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 2.00 1700.00 1287.50 1325.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 19.00 1843.42 1548.41 1789.47 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 2.00 2200.00 3414.71 1732.58 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 2.00 3000.00 3050.60 2955.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 1.00 2000.00 1982.91 2100.00 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 2.00 2750.00 1245.50 1380.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7.00 2557.14 2508.19 2033.59 STR184B-006 CULVERTS SH 184 08/06/20 1.00 3000.00 2700.00 2700.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 1.00 1300.00 2267.24 2290.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 1000.00 1026.55 1026.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 1766.67 2166.25 2005.52 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 1.00 1600.00 1685.00 1335.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 3.00 3000.00 1770.00 2050.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 2650.00 1757.86 1871.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 33.00 2085.61 1874.85 1870.81 =============== 606-01390 End Anchor Ty 3K Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 1.00 2000.00 2443.00 4280.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 1.00 2070.00 1796.21 1500.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 6.00 1850.00 1464.41 1515.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 6.00 2500.00 2328.45 3800.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 1.00 2060.00 3141.95 1825.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 340 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-01390 End Anchor Ty 3K Each =================================================== C0641-106 SH 64 Meeker West Rural Resur 03/05/20 2.00 2000.00 1975.00 2030.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 17.00 2131.18 2063.42 2562.06 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 1.00 1800.00 3654.06 2382.29 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 1.00 2500.00 2986.21 2365.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 1.00 2300.00 2114.77 2100.00 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 2.00 2100.00 1852.50 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 2160.00 2467.50 2169.46 STR184B-006 CULVERTS SH 184 08/06/20 1.00 3300.00 2800.00 2800.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 1.00 1500.00 1879.30 2670.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 1100.00 1781.52 1781.52 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 1966.67 1982.17 2417.17 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 1.00 1700.00 1810.00 1960.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 3.00 3000.00 1561.67 1810.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 2675.00 1597.14 1847.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 29.00 2194.14 2038.57 2380.82 =============== 606-01395 Transition Ty 3L Each =================================================== NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 8.00 2000.00 1230.91 977.74 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 2000.00 1230.91 977.74 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 2000.00 1230.91 977.74 =============== 606-01400 Transition Type BR10M-GR3 Each =================================================== FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 4.00 3500.00 4524.86 3700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 3500.00 4524.86 3700.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 341 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-01400 Transition Type BR10M-GR3 Each =================================================== STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 4.00 3000.00 4878.62 4170.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 8.00 2500.00 3025.33 3025.33 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.00 2666.67 4415.30 3406.89 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 2875.00 4473.30 3480.17 =============== 606-01402 Transition Type BR10B-GR3 Each =================================================== NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 10.00 3000.00 8466.88 9902.20 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 4.00 2231.00 6721.44 3000.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 4.00 3614.21 3867.20 3867.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 18.00 2965.60 7479.70 7027.27 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18.00 2965.60 7479.70 7027.27 =============== 606-01407 Transition Type BR9-GR3 Each =================================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 40.00 1500.00 1605.00 1605.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 40.00 1500.00 1605.00 1605.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 4.00 5510.72 5510.72 5510.72 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 9.00 3500.00 3745.00 3745.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 13.00 4118.68 4288.30 4288.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 53.00 2142.32 2263.17 2263.17 =============== 606-01460 Median Terminal Each =================================================== STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 1.00 7000.00 18062.45 18629.89 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 2.00 4500.00 8844.85 8910.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 5333.33 9869.02 12149.96 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 342 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-01460 Median Terminal Each =================================================== NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 8.00 9300.00 13248.46 8121.46 SFTY2254-091 225 Ramp Improvements 04/09/20 1.00 6000.00 10700.00 10400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 9.00 8933.33 13052.43 8374.63 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 3.00 9000.00 12260.16 12100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 9000.00 12260.16 12100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15.00 8226.67 11836.73 9874.77 =============== 606-02003 End Anchor (Nonflared) Each =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 1.00 4000.00 3550.34 3250.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 23.00 3217.00 2921.33 3095.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 51.00 3000.00 4653.24 4306.48 STR141A-044 SH 141 AND SH 145, FROM SLICK 01/30/20 22.00 2500.00 4167.63 3500.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 16.00 2250.00 3428.29 4200.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 4.00 2800.00 2927.57 3100.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 10.00 2500.00 3341.66 4100.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 3.00 3810.00 3733.09 3700.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 2.00 12000.00 4800.00 4800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 132.00 2981.98 3875.90 3881.56 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 20.00 4000.00 5961.29 3627.58 IM0761-226 I76/SH52 Interchange 04/02/20 3.00 3000.00 3399.78 3317.80 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 7.00 3500.00 3233.34 3166.67 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 1.00 2000.00 8305.67 8890.00 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 6.00 6000.00 3380.00 3500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 37.00 4094.59 4907.42 3636.80 STR184B-006 CULVERTS SH 184 08/06/20 1.00 4000.00 3800.00 3800.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 343 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-02003 End Anchor (Nonflared) Each =================================================== BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 8.00 3620.45 3491.45 2980.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1.00 4000.00 3304.71 3100.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 1.00 3500.00 3094.26 3050.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 12.00 3100.00 2920.50 2857.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 23.00 3376.68 3174.53 2959.74 MPC040-061 R2 FY 21 Sign Replacement 10/01/20 1.00 3835.79 7800.00 5500.00 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 1.00 5000.00 8400.00 5340.00 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 2.00 3500.00 6413.33 4440.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 16.00 4700.00 3941.67 3125.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 2.00 5000.00 5045.98 4470.00 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 2.00 3700.00 4045.35 4412.69 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 5.00 3742.00 4696.96 4335.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 4.00 3250.76 3250.76 3250.76 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 27.00 2654.82 2840.66 2840.66 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 60.00 3530.48 4129.77 3314.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 252.00 3311.96 3914.28 3626.44 =============== 606-02005 End Anchor (Flared) Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 20.00 2575.00 2535.67 2750.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 7.00 3250.00 3018.15 2900.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 12.00 3000.00 3150.00 3000.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 12.00 3000.00 4647.83 3995.65 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 1.00 2800.00 3250.00 2975.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 16.00 3000.00 2520.00 2240.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 41.00 3600.00 2930.09 3000.00 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 12.00 3000.00 4255.00 6200.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 2.00 4000.00 4476.67 4300.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 10.00 3200.00 2443.52 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 133.00 3162.78 2975.38 3226.04 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 27.00 3000.00 3507.50 3275.00 IM0761-226 I76/SH52 Interchange 04/02/20 2.00 3000.00 3654.58 3572.20 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 21.00 4000.00 5242.47 4325.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 344 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-02005 End Anchor (Flared) Each =================================================== SFTY2254-091 225 Ramp Improvements 04/09/20 3.00 4000.00 3010.00 2920.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 5.00 3500.00 2538.86 2469.78 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 3.00 3250.00 3476.04 3400.00 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 6.00 5000.00 3395.50 3500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 67.00 3585.82 3945.78 3562.74 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1.00 4000.00 2975.86 2800.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 4.00 3000.00 3121.02 3270.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 3200.00 3088.24 3176.00 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 25.00 4000.00 7046.67 4540.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 7.00 5000.00 5294.40 4505.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 20.00 4000.00 3787.94 5000.00 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 6.00 3500.00 5554.33 5586.65 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 6.00 3500.00 4801.54 3820.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 27.00 3000.00 3128.33 3600.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 25.00 2837.56 3036.19 3036.19 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 116.00 3525.34 4266.29 4091.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 321.00 3382.68 3701.81 3608.18 =============== 606-10300 Brdg Rail Ty 3 Lin Foot =============================================== NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 136.00 200.00 269.05 417.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 136.00 200.00 269.05 417.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 136.00 200.00 269.05 417.15 =============== 606-10405 Brdg Rail Ty 4 (Spec) Lin Foot =============================================== NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 79.00 750.00 425.00 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 79.00 750.00 425.00 300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 79.00 750.00 425.00 300.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 345 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-10700 Brdg Rail Ty 7 Lin Foot =============================================== NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 664.00 250.00 133.60 128.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 587.00 100.00 119.21 148.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 13.00 130.00 670.60 550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,264.00 179.11 129.56 141.63 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,264.00 179.11 129.56 141.63 =============== 606-10900 Brdg Rail Ty 9 Lin Foot =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 3,469.00 190.22 195.03 195.03 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,469.00 190.22 195.03 195.03 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 518.00 271.25 271.25 271.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 518.00 271.25 271.25 271.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,987.00 200.75 204.93 204.93 =============== 606-11010 Brdg Rail Ty 10R Lin Foot =============================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 5,118.00 185.00 156.90 157.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 127.00 150.00 253.29 266.57 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 1,215.00 210.00 146.00 132.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 501.00 150.00 168.68 180.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6,961.00 186.21 157.70 156.29 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,961.00 186.21 157.70 156.29 =============== 606-11015 Brdg Rail Ty 10R (Spec) Lin Foot =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 244.00 239.68 321.06 321.06 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 244.00 239.68 321.06 321.06 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 244.00 239.68 321.06 321.06 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 346 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-11030 Brdg Rail Ty 10M Lin Foot =============================================== BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 648.00 180.00 172.62 165.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 648.00 180.00 172.62 165.00 IM0761-226 I76/SH52 Interchange 04/02/20 232.00 210.00 271.98 195.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 380.00 220.00 215.25 112.04 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 612.00 216.21 235.00 143.49 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,260.00 197.59 206.64 154.55 =============== 606-11032 Brdg Rail Ty 10M (Spec) Lin Foot =============================================== IM0761-226 I76/SH52 Interchange 04/02/20 231.00 220.00 308.73 225.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 231.00 220.00 308.73 225.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 231.00 220.00 308.73 225.00 =============== 606-11035 Brdg Rail Ty 10 MASH Lin Foot =============================================== FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 250.00 250.00 259.21 205.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 250.00 250.00 259.21 205.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 280.00 200.00 212.62 188.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 244.00 239.68 323.03 323.03 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 524.00 218.48 226.62 250.88 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 460.00 272.67 291.50 291.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 460.00 272.67 291.50 291.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,234.00 245.06 248.89 256.73 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 347 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-20010 Tensioned Cable Barrier Lin Foot =============================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 825.00 15.00 40.79 41.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 825.00 15.00 40.79 41.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 825.00 15.00 40.79 41.00 =============== 606-20014 Tensioned Cable Barrier (TL-4) Lin Foot =============================================== IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 19,943.00 25.00 18.59 17.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 19,943.00 25.00 18.59 17.78 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 18,664.00 14.21 15.20 15.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 18,664.00 14.21 15.20 15.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 38,607.00 19.78 17.51 16.53 =============== 606-21010 End Anchor (Tens Cab Bar) Each =================================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 3.00 5000.00 3242.41 3300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 5000.00 3242.41 3300.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 6.00 8000.00 2972.22 2944.44 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 8000.00 2972.22 2944.44 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 50.00 2733.50 2924.85 2924.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 50.00 2733.50 2924.85 2924.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 59.00 3384.32 3020.08 2945.92 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 348 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-99999 Gdrail Ty 7 (Precast) Lin Foot =============================================== NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 300.00 90.00 124.83 109.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 300.00 90.00 124.83 109.65 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 860.00 100.00 117.38 111.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 860.00 100.00 117.38 111.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,160.00 97.41 118.48 110.65 =============== 607-00000 Line Post Each =================================================== BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 134.00 169.29 15.69 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 134.00 169.29 15.69 13.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 134.00 169.29 15.69 13.00 =============== 607-00005 End Post Each =================================================== BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 1.00 200.00 302.34 300.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 200.00 302.34 300.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 12.00 200.00 212.43 192.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 2.00 350.00 601.67 322.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 14.00 221.43 235.33 211.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 7.00 200.00 305.37 335.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 10.00 242.90 263.86 263.86 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 17.00 225.24 297.39 293.15 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 349 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-00005 End Post Each =================================================== NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 16.00 500.00 1171.67 1065.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 80.00 160.00 162.17 186.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 24.00 148.07 158.43 158.43 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 120.00 202.95 249.79 297.69 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 152.00 207.12 251.63 289.21 =============== 607-00010 Corner and Line Br Post Each =================================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 18.00 300.00 254.73 258.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 18.00 300.00 254.73 258.50 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 10.00 340.79 337.83 270.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 7.00 250.00 366.99 423.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 298.00 323.72 323.72 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 18.00 303.11 347.67 332.48 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 22.00 550.00 1171.67 1065.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 95.00 220.00 212.00 249.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 56.00 228.58 244.58 244.58 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 173.00 264.74 306.17 351.34 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 209.00 271.08 303.77 341.72 =============== 607-00015 End Post (Spec) Each =================================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 20.00 400.00 395.31 357.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20.00 400.00 395.31 357.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 350 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-00015 End Post (Spec) Each =================================================== NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 26.00 800.00 698.44 736.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 26.00 800.00 698.44 736.60 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 85.00 400.00 397.33 423.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 85.00 400.00 397.33 423.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 131.00 479.39 461.28 475.24 =============== 607-00020 Corner and Line Br Post (Spec) Each =================================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 37.00 150.00 558.11 467.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 37.00 150.00 558.11 467.50 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 78.00 800.00 761.59 736.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 78.00 800.00 761.59 736.60 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 154.00 700.00 585.83 683.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 154.00 700.00 585.83 683.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 269.00 653.35 635.52 668.90 =============== 607-01000 Fence BW MP Lin Foot =============================================== BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 265.00 5.00 4.50 4.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 265.00 5.00 4.50 4.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 351 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-01000 Fence BW MP Lin Foot =============================================== STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 700.00 4.00 7.50 10.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 7,260.00 3.00 3.03 2.81 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7,960.00 3.09 3.18 3.44 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 695.00 10.00 8.71 5.75 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 2,393.00 3.85 5.45 4.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,088.00 5.23 6.04 4.94 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,313.00 3.72 3.99 3.86 =============== 607-01010 Fence BW MP (Spec) Lin Foot =============================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 240.00 7.00 4.32 3.85 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 240.00 7.00 4.32 3.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 240.00 7.00 4.32 3.85 =============== 607-01100 Fence BW TWP Lin Foot =============================================== STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 80.00 10.00 15.80 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 80.00 10.00 15.80 30.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 80.00 10.00 15.80 30.00 =============== 607-01110 Fence BW TWP (Spec) Lin Foot =============================================== NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 609.00 5.00 7.20 7.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 609.00 5.00 7.20 7.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 609.00 5.00 7.20 7.40 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 352 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-11200 Fence CW MP Lin Foot =============================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 8,470.00 5.00 4.54 5.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8,470.00 5.00 4.54 5.45 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 298.00 10.00 30.33 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 298.00 10.00 30.33 13.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 2,500.00 6.00 4.85 5.70 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 2,117.50 3.95 4.29 4.29 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,617.50 5.06 4.78 5.05 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 25,483.47 2.49 2.66 2.66 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 25,483.47 2.49 2.66 2.66 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 38,868.97 3.40 4.36 3.63 =============== 607-11300 Fence CW TWP Lin Foot =============================================== NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 23,751.00 3.50 3.94 4.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 23,751.00 3.50 3.94 4.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 23,751.00 3.50 3.94 4.55 =============== 607-11350 Fence Deer Lin Foot =============================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 9,740.00 9.00 11.55 10.18 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 9,740.00 9.00 11.55 10.18 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 353 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-11350 Fence Deer Lin Foot =============================================== NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 14,958.00 12.00 12.35 10.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 14,958.00 12.00 12.35 10.80 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 6,541.00 15.00 24.38 23.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6,541.00 15.00 24.38 23.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 31,239.00 11.69 13.21 13.21 =============== 607-11360 Fence Deer (Spec) Lin Foot =============================================== NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 31,301.00 10.00 9.92 10.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 31,301.00 10.00 9.92 10.90 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 31,301.00 10.00 9.92 10.90 =============== 607-11455 Fence Wood Lin Foot =============================================== STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 24.00 40.00 65.52 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 24.00 40.00 65.52 150.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 30.00 60.00 28.07 31.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 30.00 60.00 28.07 31.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 54.00 51.11 38.77 83.94 =============== 607-11525 Fence (Plastic) Lin Foot =============================================== NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 50.00 5.00 10.48 3.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 354 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-11525 Fence (Plastic) Lin Foot =============================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 1,400.00 5.00 5.00 5.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 140.00 4.00 6.66 5.50 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 1,500.00 5.00 4.13 5.25 PWQM240-172 El Paso County, north Colorad 01/23/20 8,347.00 6.00 1.75 1.50 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 100.00 4.00 8.50 7.00 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 1,200.00 10.00 4.55 4.20 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 9,825.00 7.00 2.82 2.40 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 1,110.00 4.00 3.34 4.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 2,742.00 3.50 4.70 5.25 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 500.00 5.00 3.00 5.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 500.00 10.00 5.17 10.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 75.00 3.00 2.85 2.85 STRR300-249 Grand and Jackson Counties AD 03/05/20 500.00 7.00 4.83 0.50 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 500.00 10.00 2.88 0.50 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 300.00 10.00 8.30 5.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 3,157.00 5.00 3.36 3.20 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1,000.00 5.00 3.70 3.25 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 210.00 4.00 5.40 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 33,156.00 6.08 3.26 3.04 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 200.00 4.00 3.88 2.85 IM0761-226 I76/SH52 Interchange 04/02/20 1,298.00 3.00 3.87 5.19 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 134.00 3.00 7.08 1.00 SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 200.00 4.00 2.00 2.00 SFTY2254-091 225 Ramp Improvements 04/09/20 680.00 3.00 2.80 2.60 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 7,409.00 4.00 2.86 3.03 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1601-082 Hawkins Signal and Curb Ramps 04/30/20 300.00 5.00 6.53 4.60 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 330.00 4.50 8.33 5.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 800.00 5.00 3.74 2.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 1,000.00 10.00 4.79 2.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 535.00 5.00 4.84 4.84 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 150.00 4.00 9.46 4.00 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 300.00 4.00 6.25 7.50 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 75.00 4.00 5.67 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 13,411.00 4.42 3.35 3.32 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 200.00 5.00 6.00 6.00 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 300.00 10.00 3.60 4.00 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 2,410.00 5.00 3.05 1.75 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 355 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-11525 Fence (Plastic) Lin Foot =============================================== STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 673.00 4.25 3.05 3.40 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 117.00 5.00 2.98 2.50 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 236.00 5.00 3.00 2.75 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 345.00 4.00 3.00 3.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 300.00 3.00 6.50 9.00 STR184B-006 CULVERTS SH 184 08/06/20 300.00 5.00 3.00 3.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 384.00 3.00 4.70 5.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 500.00 7.00 7.00 15.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 450.00 3.42 3.42 3.42 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 500.00 10.00 7.61 2.80 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 500.00 4.00 8.95 2.75 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1,070.00 6.00 3.76 5.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 100.00 4.00 3.66 5.25 SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 200.00 4.00 7.25 12.50 CR400-374 FY 20 Culvert Prioritization 09/17/20 600.00 3.50 3.29 4.25 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 4,080.00 3.90 4.24 4.24 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 13,265.00 4.77 4.29 4.25 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 500.00 7.00 3.33 2.00 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 1,100.00 4.00 3.67 5.40 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 1,000.00 3.00 7.14 3.09 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 150.00 3.00 5.23 0.10 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 200.00 5.00 3.88 4.00 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 400.00 4.00 3.25 4.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 50.00 8.00 6.25 4.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 1,340.00 8.00 7.00 5.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 250.00 5.00 6.01 3.50 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 3,000.00 2.10 2.10 2.10 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 200.00 2.70 4.17 3.85 CR100-342 US-6 at Garrison 12/17/20 500.00 4.00 5.13 1.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 13,500.00 3.35 3.58 3.58 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 22,190.00 3.62 4.25 3.43 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 82,022.00 4.93 3.57 3.39 =============== 607-11530 Fence (Spec) Lin Foot =============================================== STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 832.00 5.00 7.87 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 832.00 5.00 7.87 10.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 832.00 5.00 7.87 10.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 356 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-11575 Rock Fall Fence Lin Foot =============================================== NHPP0702-407 PR I-70 Glenwood Springs Griz 11/03/20 320.00 2234.38 2203.87 1207.03 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 320.00 2234.38 2203.87 1207.03 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 320.00 2234.38 2203.87 1207.03 =============== 607-11580 Fence (Temp) Lin Foot =============================================== STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 165.00 5.50 10.50 20.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 60.00 12.00 7.91 4.54 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 225.00 7.23 9.52 15.88 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 20.00 6.00 19.60 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20.00 6.00 19.60 5.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 245.00 7.13 10.23 14.99 =============== 607-11581 Fence (Temp) (Spec) Lin Foot =============================================== NHPP0702-407 PR I-70 Glenwood Springs Griz 11/03/20 5,500.00 300.00 114.34 124.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5,500.00 300.00 114.34 124.90 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,500.00 300.00 114.34 124.90 =============== 607-15000 Fence Conc (Sound) Sq Foot ================================================ NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 34,733.00 45.00 43.08 38.40 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 16,837.00 55.00 47.67 32.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 51,570.00 48.26 44.11 36.31 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 51,570.00 48.26 44.11 36.31 =============== 607-52900 Line Post (CL) Each =================================================== SHE 0703-461 I-70 and Kipling North Phase 03/26/20 40.00 95.00 88.40 85.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 40.00 95.00 88.40 85.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 357 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-52900 Line Post (CL) Each =================================================== NH050A-035 US 50A Pueblo Regional Pond 05/28/20 125.00 85.00 13.43 5.00 NH050A-037 US 50A Pueblo Regional Pond -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 125.00 85.00 13.43 5.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 6.00 85.00 146.63 162.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 85.00 146.63 162.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 171.00 87.34 28.29 29.22 =============== 607-52905 End Post (CL) Each =================================================== NH050A-035 US 50A Pueblo Regional Pond 05/28/20 4.00 200.00 178.13 230.00 NH050A-037 US 50A Pueblo Regional Pond -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 200.00 178.13 230.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 2.00 210.00 257.71 240.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 210.00 257.71 240.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 203.33 202.35 233.33 =============== 607-52910 Corner and Line Br Post (CL) Each =================================================== SHE 0703-461 I-70 and Kipling North Phase 03/26/20 4.00 350.00 342.40 290.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 350.00 342.40 290.00 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 8.00 225.00 231.38 320.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 358 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-52910 Corner and Line Br Post (CL) Each =================================================== NH050A-037 US 50A Pueblo Regional Pond -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 225.00 231.38 320.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 4.00 300.00 338.71 310.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 300.00 338.71 310.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 275.00 278.04 310.00 =============== 607-53005 Fence CL (Spec) Lin Foot =============================================== NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 236.00 270.00 94.50 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 236.00 270.00 94.50 110.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 240.00 165.80 180.10 180.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 240.00 165.80 180.10 180.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 476.00 217.46 123.35 145.34 =============== 607-53137 Fence CL (Spec) (36 In) Lin Foot =============================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1,177.00 65.00 46.64 47.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,177.00 65.00 46.64 47.20 IM0761-226 I76/SH52 Interchange 04/02/20 209.00 60.00 64.05 58.46 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 209.00 60.00 64.05 58.46 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 3,145.21 28.00 30.42 30.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,145.21 28.00 30.42 30.42 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 359 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-53137 Fence CL (Spec) (36 In) Lin Foot =============================================== FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 514.00 64.63 64.63 64.63 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 514.00 64.63 64.63 64.63 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,045.21 41.69 45.52 38.98 =============== 607-53148 Fence CL (48 In) Lin Foot =============================================== SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 313.00 25.00 20.39 19.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 313.00 25.00 20.39 19.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 313.00 25.00 20.39 19.00 =============== 607-53161 Fence CL (Spec) (60 In) Lin Foot =============================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 228.00 85.00 92.24 99.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 228.00 85.00 92.24 99.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 228.00 85.00 92.24 99.00 =============== 607-53172 Fence CL (72 In) Lin Foot =============================================== SHE 0703-461 I-70 and Kipling North Phase 03/26/20 40.00 80.00 19.40 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 40.00 80.00 19.40 18.00 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 1,410.00 15.00 23.49 28.00 NH050A-037 US 50A Pueblo Regional Pond -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,410.00 15.00 23.49 28.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 160.00 100.00 37.50 20.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 360 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-53172 Fence CL (72 In) Lin Foot =============================================== MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 10.00 30.00 103.40 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 170.00 95.88 46.41 22.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,620.00 25.09 24.13 27.19 =============== 607-53191 Fence CL (Spec) (92 In) Lin Foot =============================================== IM0761-226 I76/SH52 Interchange 04/02/20 214.00 80.00 132.91 132.98 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 214.00 80.00 132.91 132.98 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 214.00 80.00 132.91 132.98 =============== 607-53220 Fence CL (120 In) Lin Foot =============================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 1,840.00 60.00 162.17 203.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,840.00 60.00 162.17 203.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,840.00 60.00 162.17 203.00 =============== 607-53500 Fence CL (Pedest) Lin Foot =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 273.00 28.00 30.42 30.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 273.00 28.00 30.42 30.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 273.00 28.00 30.42 30.42 =============== 607-55040 Mesh Anchor Each =================================================== C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 17.00 1500.00 1086.60 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 17.00 1500.00 1086.60 1200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17.00 1500.00 1086.60 1200.00 =============== 607-55050 Mesh Anchor (Spec) Each =================================================== C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 100.00 2200.00 1884.80 2300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 100.00 2200.00 1884.80 2300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 100.00 2200.00 1884.80 2300.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 361 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-55099 Wire Mesh (Anchored) Sq Foot ================================================ C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 2,010.00 50.00 74.00 56.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,010.00 50.00 74.00 56.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,010.00 50.00 74.00 56.00 =============== 607-55100 Wire Mesh (Draped) Sq Foot ================================================ C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 82,560.00 4.00 4.09 3.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 82,560.00 4.00 4.09 3.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 82,560.00 4.00 4.09 3.30 =============== 607-55103 Cable Net (Spec) Sq Foot ================================================ C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 28,635.00 10.00 10.11 7.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 28,635.00 10.00 10.11 7.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 28,635.00 10.00 10.11 7.50 =============== 607-55104 Wire Mesh (Special) Sq Foot ================================================ C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 3,300.00 10.00 13.09 10.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,300.00 10.00 13.09 10.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,300.00 10.00 13.09 10.50 =============== 607-55110 Safety Rail (Cable) Lin Foot =============================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 10.00 10.00 266.67 260.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 10.00 266.67 260.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 507.00 37.00 37.96 37.96 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 507.00 37.00 37.96 37.96 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 362 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-55110 Safety Rail (Cable) Lin Foot =============================================== NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 162.00 60.00 48.75 60.25 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 2,121.00 29.50 32.05 32.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,283.00 31.66 37.87 34.05 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 25.00 250.00 139.75 79.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 809.00 36.19 38.72 38.72 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 834.00 42.60 49.83 39.93 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,634.00 34.86 41.65 36.57 =============== 607-60000 Deer Gate Each =================================================== NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 10.00 2000.00 1986.72 1820.52 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 2000.00 1986.72 1820.52 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 10.00 2000.00 353.83 426.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 2000.00 353.83 426.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 2000.00 1233.08 1123.26 =============== 607-60002 Game Ramp Each =================================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 6.00 8000.00 9216.00 6325.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 8000.00 9216.00 6325.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 14.00 8000.00 9877.73 7181.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 14.00 8000.00 9877.73 7181.90 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 8000.00 9660.17 6924.83 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 363 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-60008 Game Ramp (Special) Each =================================================== NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 4.00 8500.00 11650.00 10000.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 12.00 6000.00 7424.17 8080.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 16.00 6625.00 8027.86 8560.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 6625.00 8027.86 8560.00 =============== 607-60112 12 Ft Gate Each =================================================== NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 10.00 250.00 271.17 311.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 250.00 271.17 311.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 250.00 271.17 311.00 =============== 607-60116 16 Ft Gate Each =================================================== NH050A-035 US 50A Pueblo Regional Pond 05/28/20 1.00 1000.00 1892.13 5000.00 NH050A-037 US 50A Pueblo Regional Pond -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 1000.00 1892.13 5000.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 17.00 600.00 514.83 559.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 17.00 600.00 514.83 559.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18.00 622.22 615.00 805.72 =============== 607-60117 16 Ft Gate (Spec) Each =================================================== NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 25.00 700.00 1213.17 1060.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 2.00 593.91 635.48 635.48 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 27.00 692.14 1205.57 1028.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 27.00 692.14 1205.57 1028.55 =============== 607-60120 20 Ft Gate Each =================================================== NH050A-035 US 50A Pueblo Regional Pond 05/28/20 2.00 600.00 2344.50 5500.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 364 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-60120 20 Ft Gate Each =================================================== NH050A-037 US 50A Pueblo Regional Pond -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 600.00 2344.50 5500.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 2.00 624.37 668.08 668.08 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 624.37 668.08 668.08 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 612.19 2158.23 3084.04 =============== 607-60620 Road Closure Gate Each =================================================== STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 1.00 2000.00 15175.80 20950.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 2000.00 15175.80 20950.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1.00 20475.00 20475.00 20475.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 20475.00 20475.00 20475.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 11237.50 15932.83 20712.50 =============== 608-00000 Conc Sidewalk Sq Yard ================================================ FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 468.00 75.00 90.00 90.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 931.00 80.00 81.47 102.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 424.00 75.00 75.80 95.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 25.20 95.00 125.00 150.00 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 2.00 120.00 381.40 250.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 110.00 100.00 88.00 100.00 STRR300-249 Grand and Jackson Counties AD 03/05/20 560.00 80.00 115.67 94.00 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 76.00 100.00 98.76 82.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 2,232.00 85.00 83.50 85.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 463.00 50.00 83.05 78.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,291.20 79.43 86.18 90.23 C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 110.00 48.00 94.90 120.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 365 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 608-00000 Conc Sidewalk Sq Yard ================================================ FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 350.00 65.00 95.00 110.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 10.00 300.00 247.75 246.00 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 2.00 150.00 311.90 250.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 52.00 180.00 151.67 140.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 112.00 87.35 132.63 96.16 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 636.00 79.36 112.78 114.32 STMM086-083 ADA PUEBLO METRO 07/09/20 2,302.00 75.00 112.00 98.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 124.00 100.00 123.67 135.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 338.00 95.00 97.67 83.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 2,130.00 85.00 91.50 70.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 858.00 80.00 103.05 76.26 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 141.00 80.00 67.48 63.90 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 310.00 50.00 108.12 121.77 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6,203.00 79.58 97.83 85.71 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 1,109.00 80.00 94.00 75.00 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 30.00 250.00 224.67 240.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 68.00 100.00 148.33 135.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 291.00 130.00 92.00 84.00 CR100-342 US-6 at Garrison 12/17/20 650.00 75.00 84.50 69.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 4,662.00 49.82 53.10 53.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6,810.00 61.95 78.89 61.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18,940.20 73.19 90.73 79.10 =============== 608-00005 Conc Sidewalk (Spec) Sq Yard ================================================ FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 63.00 125.00 150.00 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 63.00 125.00 150.00 150.00 IM0761-226 I76/SH52 Interchange 04/02/20 188.00 145.00 109.37 85.33 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 188.00 145.00 109.37 85.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 251.00 139.98 111.23 101.56 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 366 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 608-00006 Conc Sidewalk (6 In) Sq Yard ================================================ NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 3,015.00 65.00 66.80 49.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 102.00 90.00 108.77 72.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 17.00 71.00 203.59 131.50 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 2,827.00 60.00 63.71 81.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 275.00 80.00 90.60 97.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6,236.00 63.82 66.69 66.22 IM0761-226 I76/SH52 Interchange 04/02/20 3,015.00 65.00 58.34 46.64 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 355.00 100.00 145.33 125.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 74.00 120.00 106.00 120.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 12.00 70.00 145.00 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,456.00 69.79 63.09 56.79 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 196.00 100.00 87.50 105.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 225.00 85.00 65.43 53.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 421.00 91.98 69.83 77.21 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 29.00 150.00 123.38 123.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 29.00 150.00 123.38 123.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10,142.00 67.27 65.63 63.63 =============== 608-00010 Conc Curb Ramp Sq Yard ================================================ NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 283.00 200.00 206.67 207.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 93.00 185.00 175.00 175.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 661.00 170.00 252.33 311.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 466.00 170.00 184.72 190.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 108.30 200.00 225.00 250.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 25.00 185.00 254.60 183.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 367 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 608-00010 Conc Curb Ramp Sq Yard ================================================ C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 179.00 180.00 187.00 142.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 50.00 175.00 280.64 131.50 STRR300-249 Grand and Jackson Counties AD 03/05/20 2,123.00 170.00 200.33 192.00 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 630.00 150.00 147.19 137.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 683.00 150.00 205.00 180.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 741.00 160.00 158.14 200.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 187.00 150.00 121.60 107.75 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 109.00 200.00 209.80 170.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6,338.30 167.07 187.39 195.06 IM0761-226 I76/SH52 Interchange 04/02/20 430.00 175.00 171.61 212.00 C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 166.00 160.00 202.07 235.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 1,036.00 150.00 220.00 230.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 203.00 150.00 268.00 377.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 265.00 180.00 215.33 245.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 33.00 175.00 223.33 200.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 58.00 185.00 244.00 318.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 101.00 180.00 230.83 150.16 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,292.00 161.45 206.46 240.02 STMM086-083 ADA PUEBLO METRO 07/09/20 3,489.00 120.00 196.50 175.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 338.00 180.00 208.00 166.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 181.00 175.00 209.00 234.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 1,603.00 160.00 143.67 141.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 3,196.00 220.00 187.33 135.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 1,934.00 175.00 202.45 146.24 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 58.00 185.00 188.14 130.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 68.00 200.00 179.93 210.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 286.00 100.00 151.53 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 11,153.00 166.97 187.16 153.43 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 1,432.00 150.00 176.67 165.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 197.00 200.00 288.33 160.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 116.00 270.00 248.00 260.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 316.00 250.00 145.00 145.00 CR100-342 US-6 at Garrison 12/17/20 1,502.00 182.00 171.50 149.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 368 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 608-00010 Conc Curb Ramp Sq Yard ================================================ NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 805.00 134.82 146.66 146.66 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,368.00 170.88 177.20 156.97 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 24,151.30 167.18 187.35 173.21 =============== 608-00015 Detectable Warnings Sq Foot ================================================ NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 200.00 75.00 60.67 67.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 341.00 75.00 62.70 66.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 24.00 113.00 131.64 139.50 STRR300-249 Grand and Jackson Counties AD 03/05/20 734.00 100.00 113.33 128.00 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 44.00 75.00 46.50 47.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 48.00 60.00 44.40 44.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,391.00 88.33 89.24 98.80 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 16.00 80.00 96.10 115.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16.00 80.00 96.10 115.50 STMM086-083 ADA PUEBLO METRO 07/09/20 40.00 70.00 112.50 125.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 20.00 115.00 138.50 57.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 278.00 75.00 54.00 45.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 114.00 90.00 91.17 55.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 69.00 100.00 89.29 54.46 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 521.00 82.74 77.02 55.04 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 53.00 75.00 123.33 100.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 20.00 100.00 78.25 94.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 16.00 50.00 120.00 105.00 CR100-342 US-6 at Garrison 12/17/20 15.00 125.00 103.48 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 104.00 83.17 108.10 96.73 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,032.00 86.57 86.68 87.60 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 369 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 608-00018 Curb Ramp (Temp Parallel) (Single) Each =================================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 4.00 1000.00 2720.00 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 1000.00 2720.00 1500.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 1.00 1500.00 1090.00 1975.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 1500.00 1090.00 1975.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 1100.00 2394.00 1595.00 =============== 608-00350 Conc Sidewalk (C) Sq Yard ================================================ STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 62.00 100.00 98.84 116.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 62.00 100.00 98.84 116.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 62.00 100.00 98.84 116.00 =============== 608-10000 Sidewalk Drain Lin Foot =============================================== C1601-082 Hawkins Signal and Curb Ramps 04/30/20 6.00 350.00 281.67 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 350.00 281.67 250.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 6.00 275.00 472.93 310.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 275.00 472.93 310.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 312.50 415.55 280.00 =============== 608-10010 Sidewalk Drain Each =================================================== FSA2873-194 US 287 Longmont Intersection 02/13/20 1.00 3500.00 3911.67 3620.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 3500.00 3911.67 3620.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 3500.00 3911.67 3620.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 370 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 609-20000 Curb Ty 2 B (Spec) Lin Foot =============================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 143.00 30.00 55.00 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 143.00 30.00 55.00 55.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 143.00 30.00 55.00 55.00 =============== 609-20010 Curb Ty 2 B Lin Foot =============================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 326.00 51.00 30.37 37.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 40.00 57.00 47.71 65.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 26.00 70.00 37.50 31.00 STRR300-249 Grand and Jackson Counties AD 03/05/20 46.00 35.00 63.00 39.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 395.00 40.00 31.67 24.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 833.00 45.78 34.45 32.10 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 123.00 50.00 72.00 72.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 15.00 75.00 142.00 91.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 138.00 52.72 79.61 74.07 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 7.00 50.00 51.67 35.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 244.00 70.00 53.50 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 251.00 69.44 53.47 64.16 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 154.00 50.00 65.00 45.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 103.00 50.00 42.00 34.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 584.00 19.41 27.68 27.68 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 841.00 28.76 43.81 31.63 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,063.00 42.18 44.66 38.62 =============== 609-20011 Curb Ty 2 M Lin Foot =============================================== HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1,382.00 25.00 35.60 36.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,382.00 25.00 35.60 36.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,382.00 25.00 35.60 36.55 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 371 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 609-21010 C and G Ty 2 I-B Lin Foot =============================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 493.00 35.00 34.00 34.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 1,700.00 25.00 41.78 23.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 1,027.00 40.00 57.08 49.10 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 6,215.00 25.00 31.50 35.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 5,363.00 28.00 26.86 28.15 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 2,456.00 22.00 32.63 32.05 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 24.00 33.50 47.20 58.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 17,278.00 26.69 31.42 32.12 IM0761-226 I76/SH52 Interchange 04/02/20 4,517.00 35.00 24.18 28.62 C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 527.00 30.00 26.77 34.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 258.00 35.00 75.33 91.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,302.00 34.50 25.46 32.19 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 982.00 40.00 38.50 42.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 32.00 50.00 43.67 36.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 250.00 45.00 45.37 34.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 83.00 45.00 48.05 34.23 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 320.00 30.00 32.36 21.50 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 610.00 40.00 41.95 21.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,277.00 39.47 39.88 32.41 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 12.00 50.00 49.00 45.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 125.00 40.00 69.40 65.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 258.00 35.00 41.50 33.00 CR100-342 US-6 at Garrison 12/17/20 950.00 35.00 42.33 38.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 3,689.00 24.23 25.02 25.02 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5,034.00 27.27 37.11 28.92 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 29,891.00 29.15 30.97 31.61 =============== 609-21011 C and G Ty 2 I-M Lin Foot =============================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 5,518.00 20.00 41.27 43.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,518.00 20.00 41.27 43.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 372 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 609-21011 C and G Ty 2 I-M Lin Foot =============================================== IM0761-226 I76/SH52 Interchange 04/02/20 745.00 40.00 28.00 29.68 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 20,421.00 17.00 25.47 19.98 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 67.00 40.00 43.61 45.07 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 21,233.00 17.88 25.59 20.40 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 84.00 43.00 60.50 86.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 7.00 50.00 50.67 32.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 91.00 43.54 59.41 81.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26,842.00 18.40 27.02 25.25 =============== 609-21013 C and G Ty 2 I-M (Spec) Lin Foot =============================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 271.00 40.00 38.00 38.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 271.00 40.00 38.00 38.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 69.00 35.00 81.00 97.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 69.00 35.00 81.00 97.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 340.00 38.99 56.62 49.97 =============== 609-21020 C and G Ty 2 II-B Lin Foot =============================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 1,136.00 35.00 38.00 38.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 2,095.00 40.00 35.03 45.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 202.00 30.00 41.20 53.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 30.90 40.00 80.00 70.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 275.00 45.00 49.50 47.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 373 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 609-21020 C and G Ty 2 II-B Lin Foot =============================================== STRR300-249 Grand and Jackson Counties AD 03/05/20 457.00 40.00 55.33 41.00 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 98.00 40.00 41.94 38.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 7,018.00 25.00 28.00 8.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 3,857.00 34.00 30.14 31.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 690.00 30.00 45.33 45.15 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 616.00 40.00 45.80 44.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16,474.90 31.40 32.07 25.47 IM0761-226 I76/SH52 Interchange 04/02/20 5,734.00 40.00 26.81 30.74 C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 508.00 30.00 32.10 37.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 555.00 45.00 75.00 71.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 287.00 35.00 79.67 91.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 90.00 35.00 44.50 39.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 35.00 80.00 72.67 59.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 503.00 50.00 44.01 45.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7,712.00 40.29 30.77 37.45 STMM086-083 ADA PUEBLO METRO 07/09/20 3,599.00 30.00 46.50 43.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 1,168.00 45.00 41.00 44.00 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 160.00 45.00 53.88 118.90 FSAC010-124 US 40, US 287, SH 88 08/06/20 137.00 10.00 49.67 46.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 272.00 45.00 49.00 39.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 2,395.00 40.00 48.58 38.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 1,132.00 45.00 48.04 38.20 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 864.00 35.00 32.50 21.50 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 302.00 40.00 54.44 26.20 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 582.00 50.00 56.53 74.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 350.00 25.66 34.26 34.26 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10,961.00 37.27 45.97 41.77 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 1,480.00 50.00 47.00 45.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 202.00 35.00 72.15 63.25 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 49.00 60.00 65.00 69.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 1,419.00 55.00 55.15 56.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 490.00 40.00 44.00 38.00 CR100-342 US-6 at Garrison 12/17/20 850.00 35.00 44.67 39.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 374 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 609-21020 C and G Ty 2 II-B Lin Foot =============================================== NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 12,586.44 27.00 28.34 28.34 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 17,076.44 32.28 41.42 33.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 52,224.34 34.23 36.38 33.26 =============== 609-21021 C and G Ty 2 II-M Lin Foot =============================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 46.00 28.00 40.93 52.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1,142.00 30.00 48.83 48.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,188.00 29.92 48.53 48.15 IM0761-226 I76/SH52 Interchange 04/02/20 64.00 45.00 41.75 33.92 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 6,539.00 20.00 31.77 27.40 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6,603.00 20.24 31.85 27.46 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 144.00 32.00 69.00 91.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 102.00 40.00 52.21 49.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 213.00 45.00 45.98 33.91 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 459.00 39.81 51.29 55.17 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 38.00 40.00 49.67 45.00 CR100-342 US-6 at Garrison 12/17/20 200.00 35.00 47.17 42.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 427.00 47.05 55.21 55.21 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 665.00 43.02 49.30 50.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,915.00 24.24 33.98 33.38 =============== 609-21023 C and G Ty 2 II-B (Spec) Lin Foot =============================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 14.00 45.00 55.00 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 14.00 45.00 55.00 55.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 375 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 609-21023 C and G Ty 2 II-B (Spec) Lin Foot =============================================== NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 268.00 60.00 48.00 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 268.00 60.00 48.00 40.00 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 306.00 90.00 62.58 88.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 306.00 90.00 62.58 88.90 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 588.00 75.26 57.54 65.81 =============== 609-21110 C & G Ty 2 I-B (Spec) Lin Foot =============================================== FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 165.00 35.00 81.00 95.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 43.00 40.00 52.33 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 208.00 36.03 75.07 84.66 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 208.00 36.03 75.07 84.66 =============== 609-21900 C and G Ty 2 (Spec) Lin Foot =============================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 616.00 40.00 52.23 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 616.00 40.00 52.23 45.00 IM0761-226 I76/SH52 Interchange 04/02/20 824.00 45.00 62.39 36.04 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 134.00 35.00 114.00 104.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 958.00 43.60 65.75 45.55 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 792.00 31.00 44.83 44.83 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 792.00 31.00 44.83 44.83 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,366.00 38.45 61.03 45.16 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 376 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 609-23000 Gutter (Special) Lin Foot =============================================== PWQM240-172 El Paso County, north Colorad 01/23/20 586.00 100.00 147.00 154.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 586.00 100.00 147.00 154.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1,660.00 45.00 56.91 62.83 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,660.00 45.00 56.91 62.83 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 192.00 65.00 106.43 36.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 192.00 65.00 106.43 36.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,438.00 59.79 67.81 82.63 =============== 609-24000 Gutter Ty 2 (Spec) Lin Foot =============================================== NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 24.00 50.00 47.50 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 24.00 50.00 47.50 45.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 24.00 50.00 47.50 45.00 =============== 609-24002 Gutter Ty 2 (2 Ft) Lin Foot =============================================== NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 632.00 40.00 37.80 19.00 STRR300-249 Grand and Jackson Counties AD 03/05/20 41.00 40.00 76.67 43.00 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 15.00 40.00 43.53 42.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 688.00 40.00 39.33 20.93 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 688.00 40.00 39.33 20.93 =============== 609-24003 Gutter Ty 2 (3 Ft) Lin Foot =============================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 590.00 65.00 30.23 31.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 590.00 65.00 30.23 31.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 590.00 65.00 30.23 31.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 377 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 609-24004 Gutter Ty 2 (4 Ft) Lin Foot =============================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 124.00 40.00 49.28 50.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 110.00 50.00 48.88 43.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 51.00 60.00 85.00 85.00 STRR300-249 Grand and Jackson Counties AD 03/05/20 13.00 50.00 143.67 47.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 44.00 35.00 64.45 52.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 342.00 45.94 54.71 53.12 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 65.00 41.00 87.67 78.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 65.00 41.00 87.67 78.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 22.00 45.00 97.75 37.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 22.00 45.00 97.75 37.90 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 25.00 50.00 66.67 55.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 364.00 50.00 56.62 80.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 389.00 50.00 56.95 79.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 818.00 47.45 59.23 67.06 =============== 609-24006 Gutter Ty 2 (6 Ft) Lin Foot =============================================== STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 185.00 45.00 194.80 324.59 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 127.00 60.00 127.00 127.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 312.00 51.11 177.47 244.16 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 550.00 40.00 63.74 58.17 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 378 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 609-24006 Gutter Ty 2 (6 Ft) Lin Foot =============================================== FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 550.00 40.00 63.74 58.17 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 7.00 100.00 215.92 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7.00 100.00 215.92 50.00 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 20.00 80.00 80.00 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 20.00 80.00 80.00 55.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 889.00 45.27 76.52 123.31 =============== 609-24008 Gutter Ty 2 (8 Ft) Lin Foot =============================================== IM0761-226 I76/SH52 Interchange 04/02/20 68.00 150.00 94.57 51.94 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 68.00 150.00 94.57 51.94 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 978.00 80.00 74.68 92.40 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 83.00 95.00 155.01 88.03 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,061.00 81.17 80.96 92.06 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,129.00 85.32 82.08 89.64 =============== 609-24010 Gutter Ty 2 (10 Ft) Lin Foot =============================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 110.00 160.00 104.69 98.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 110.00 160.00 104.69 98.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 110.00 160.00 104.69 98.00 =============== 609-31010 C and G Ty 2 I-B (Fast Track) Lin Foot =============================================== SHE 0703-461 I-70 and Kipling North Phase 03/26/20 443.00 55.00 50.60 48.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 443.00 55.00 50.60 48.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 443.00 55.00 50.60 48.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 379 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 609-40010 Curb Ty 4 B Lin Foot =============================================== FSA2873-194 US 287 Longmont Intersection 02/13/20 1,056.00 40.00 46.42 24.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,056.00 40.00 46.42 24.50 CR100-342 US-6 at Garrison 12/17/20 10.00 40.00 69.17 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 40.00 69.17 45.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,066.00 40.00 46.63 24.69 =============== 609-40011 Curb Ty 4 M Lin Foot =============================================== NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 30.00 27.00 85.00 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 30.00 27.00 85.00 80.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 60.00 45.00 48.67 50.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 60.00 45.00 48.67 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 90.00 39.00 52.70 60.00 =============== 609-40120 Curb Median Special Sq Yard ================================================ FSA2873-194 US 287 Longmont Intersection 02/13/20 41.00 70.00 149.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 41.00 70.00 149.00 100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 41.00 70.00 149.00 100.00 =============== 609-60011 Curb Ty 6 M Lin Foot =============================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 20,338.00 15.00 10.43 7.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 380 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 609-60011 Curb Ty 6 M Lin Foot =============================================== BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 180.00 30.00 37.89 36.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 150.00 30.00 29.50 25.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 925.00 15.50 33.69 26.80 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 24.00 50.00 64.17 11.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1,666.00 16.00 16.27 25.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 23,283.00 15.34 12.74 9.89 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 220.00 35.00 32.14 34.65 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 77.00 40.00 45.48 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 297.00 36.30 38.97 37.33 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 38.00 20.00 62.14 20.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 162.00 34.13 38.45 27.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 89.00 35.00 57.52 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 289.00 32.54 46.77 30.08 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 4,254.00 15.00 18.67 13.00 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 4,813.00 13.00 15.36 12.61 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 10,750.00 12.00 12.84 12.84 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 19,817.00 12.89 15.76 12.82 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 43,686.00 14.48 14.61 11.54 =============== 609-70000 Curb (Walkover) Sq Foot ================================================ NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 28.00 75.00 272.50 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 28.00 75.00 272.50 45.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 28.00 75.00 272.50 45.00 =============== 609-71000 Curb (Special) Lin Foot =============================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 484.00 50.00 42.00 42.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 381 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 609-71000 Curb (Special) Lin Foot =============================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 21.00 53.00 22.50 19.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 505.00 50.12 39.75 41.04 STMM086-083 ADA PUEBLO METRO 07/09/20 250.00 50.00 50.00 40.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 17.00 50.00 69.14 39.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 267.00 50.00 53.24 39.96 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 772.00 50.08 46.82 40.67 =============== 610-00010 Median Cover Matl (Dec) Sq Foot ================================================ NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 35.00 50.00 48.17 38.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 35.00 50.00 48.17 38.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 35.00 50.00 48.17 38.50 =============== 610-00020 Median Cover (Pattern Conc) Sq Foot ================================================ NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 225.00 30.00 54.33 70.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 1,567.00 17.50 15.00 15.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 377.00 18.00 15.03 16.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 124.00 40.00 33.31 35.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 7,259.00 10.00 16.17 14.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 30,825.00 15.00 12.49 11.50 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 13,320.00 8.00 9.43 8.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 53,697.00 12.80 12.66 11.63 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1,604.00 12.00 18.22 8.34 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 1,264.00 18.00 25.00 30.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 337.00 40.00 33.00 32.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 207.00 50.00 33.00 37.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 1,798.00 18.00 23.16 20.79 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,210.00 18.85 21.68 20.56 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 382 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 610-00020 Median Cover (Pattern Conc) Sq Foot ================================================ SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 334.00 20.00 23.00 31.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 1,877.00 10.00 12.11 11.20 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 50.00 14.00 55.76 78.77 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,261.00 11.57 13.25 15.62 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 903.00 15.00 32.52 30.25 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 2,131.50 9.57 9.83 9.83 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,034.50 11.19 22.53 15.91 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 64,202.50 13.17 13.53 12.69 =============== 610-00024 Median Cover (4 In Pattern Conc) Sq Foot ================================================ SHE 0703-461 I-70 and Kipling North Phase 03/26/20 2,416.00 12.00 17.80 19.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,416.00 12.00 17.80 19.00 IM0761-226 I76/SH52 Interchange 04/02/20 18,450.00 11.00 10.33 8.48 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 80,637.00 7.00 8.19 5.49 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 99,087.00 7.74 8.54 6.05 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 101,503.00 7.85 8.69 6.36 =============== 610-00026 Median Cover (6 In Pattern Conc) Sq Foot ================================================ NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 674.00 11.00 24.61 15.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 674.00 11.00 24.61 15.50 IM0761-226 I76/SH52 Interchange 04/02/20 5,136.00 14.00 12.66 9.54 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,136.00 14.00 12.66 9.54 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,810.00 13.65 13.30 10.23 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 383 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 610-00030 Median Cover Matl (Conc) Sq Foot ================================================ FSA2873-194 US 287 Longmont Intersection 02/13/20 8,857.00 11.00 13.63 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8,857.00 11.00 13.63 8.00 C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 1,936.00 12.00 14.60 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,936.00 12.00 14.60 15.00 STMM086-083 ADA PUEBLO METRO 07/09/20 737.00 15.00 21.50 25.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 4,907.00 13.00 11.00 9.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 150.00 12.00 23.17 18.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 76.00 40.00 17.00 25.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1,795.00 15.00 10.46 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7,665.00 13.91 11.64 10.40 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 41.00 19.00 32.25 25.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 1,971.00 20.00 18.50 21.00 CR100-342 US-6 at Garrison 12/17/20 5,905.00 12.00 15.50 11.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 7,917.00 14.03 15.87 13.94 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26,375.00 12.83 14.00 10.99 =============== 610-00035 Median Cover Matl (Conc)(Spec) Sq Foot ================================================ C1601-082 Hawkins Signal and Curb Ramps 04/30/20 965.00 20.00 22.50 17.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 965.00 20.00 22.50 17.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 965.00 20.00 22.50 17.00 =============== 610-00040 Median Cover Matl (Bitum) Ton ==================================================== NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 13.00 80.00 285.00 220.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 13.00 80.00 285.00 220.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13.00 80.00 285.00 220.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 384 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 610-00055 Median Cover Matl (Stone) Sq Foot ================================================ STRM331-008 ADA RAMPS WALSENBURG 10/15/20 2,251.00 20.00 13.17 9.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 15,625.16 2.14 2.80 2.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 17,876.16 4.39 5.93 3.58 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17,876.16 4.39 5.93 3.58 =============== 611-00024 24 Ft Cattle Gd Each =================================================== NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 3.00 20000.00 20151.67 19200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 20000.00 20151.67 19200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 20000.00 20151.67 19200.00 =============== 611-00029 28 Ft Deer Gd Each =================================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 2.00 60000.00 77863.37 62425.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 60000.00 77863.37 62425.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 60000.00 77863.37 62425.00 =============== 611-00031 30 Ft Deer Gd Each =================================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 65000.00 85404.32 67925.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 65000.00 85404.32 67925.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 65000.00 85404.32 67925.00 =============== 611-00033 32 Ft Deer Gd Each =================================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 70000.00 90338.17 67925.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 70000.00 90338.17 67925.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 385 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 611-00033 32 Ft Deer Gd Each =================================================== NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 1.00 120000.00 129571.99 123000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 120000.00 129571.99 123000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 95000.00 108647.29 95462.50 =============== 611-00044 44 Ft Deer Guard Each =================================================== FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1.00 177048.02 177048.02 177048.02 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 177048.02 177048.02 177048.02 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 177048.02 177048.02 177048.02 =============== 611-00200 ______ Ft Electrified Wildlife Barrier Each =================================================== NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 2.00 40000.00 90346.67 111700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 40000.00 90346.67 111700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 40000.00 90346.67 111700.00 =============== 612-00001 Delin (Ty I) Each =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 5.00 25.00 23.00 23.00 STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 212.00 30.00 21.00 20.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 5.00 45.00 50.38 39.75 FSA2873-194 US 287 Longmont Intersection 02/13/20 4.00 30.00 43.25 31.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 442.00 26.00 16.55 17.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 532.00 28.00 24.23 27.40 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 781.00 22.00 24.15 23.46 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 50.00 30.00 29.00 30.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 361.00 30.00 22.00 22.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 8.00 30.00 67.21 42.23 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 10.00 25.00 32.20 32.50 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 10.00 35.00 70.80 28.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,420.00 26.27 23.71 22.92 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 386 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00001 Delin (Ty I) Each =================================================== NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 267.00 25.00 21.74 22.74 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 38.00 28.00 29.15 30.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 14.00 26.00 27.38 30.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 11.00 30.00 32.62 35.00 SFTY2254-091 225 Ramp Improvements 04/09/20 26.00 30.00 70.00 68.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 233.00 35.00 22.65 17.60 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 59.00 20.00 42.67 54.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 4.00 30.00 95.00 40.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 24.00 40.00 38.41 70.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 2.00 30.00 40.28 39.00 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 6.00 25.00 27.50 25.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 31.00 25.00 29.50 18.48 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 715.00 28.83 26.09 27.57 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 30.00 25.75 39.83 26.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 20.00 75.00 135.67 24.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 6.00 120.00 130.18 23.90 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 32.00 27.00 26.82 25.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 88.00 43.82 58.23 25.13 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 75.00 24.00 64.21 24.39 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 100.00 25.00 26.03 31.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 60.00 32.00 34.63 44.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 10.00 25.00 61.60 52.00 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 10.00 30.00 48.79 40.79 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 153.00 36.00 20.92 21.25 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 32.00 21.32 21.32 21.32 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 127.00 30.00 28.02 32.30 CR100-342 US-6 at Garrison 12/17/20 14.00 30.00 138.00 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 581.00 29.59 35.87 29.06 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,804.00 27.66 28.36 24.78 =============== 612-00002 Delin (Ty II) Each =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 11.00 23.00 28.00 28.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 387 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00002 Delin (Ty II) Each =================================================== FSA2873-194 US 287 Longmont Intersection 02/13/20 1.00 40.00 46.09 35.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 4.00 26.00 17.58 18.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 74.00 26.00 26.76 29.65 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 115.00 23.00 26.83 25.50 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 16.00 35.00 26.00 26.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 50.00 25.00 34.45 34.80 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 15.00 40.00 86.80 31.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 286.00 25.79 33.58 28.54 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 68.00 26.00 26.43 27.07 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 682.00 26.00 31.80 33.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 2.00 28.00 28.08 30.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 141.00 36.00 24.80 19.80 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 6.00 25.00 55.00 81.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 11.00 45.00 45.50 80.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 8.00 40.00 31.55 20.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 918.00 27.88 29.27 31.30 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 5.00 85.00 147.50 26.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 6.00 120.00 130.99 25.93 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 36.00 30.00 31.64 30.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 47.00 47.34 52.34 29.44 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 50.00 30.00 27.73 33.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 20.00 32.00 38.68 46.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 6.00 28.00 66.24 57.00 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 50.00 31.00 27.62 29.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 126.00 30.62 32.92 34.92 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,377.00 28.36 32.04 30.99 =============== 612-00003 Delin (Ty III) Each =================================================== STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 35.00 35.00 25.50 24.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 388 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00003 Delin (Ty III) Each =================================================== STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 1.00 50.00 50.00 50.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 2.00 50.00 48.67 35.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 44.00 24.00 19.50 20.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 95.00 34.00 29.32 31.95 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 82.00 24.00 30.18 27.54 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 15.00 35.00 33.00 34.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 228.00 23.00 30.00 30.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 1.00 30.00 82.56 46.26 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 5.00 75.00 102.20 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 508.00 27.17 31.13 28.95 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 45.00 31.00 29.93 31.40 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 127.00 30.00 33.40 35.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 1.00 30.00 28.78 30.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 14.00 30.00 40.05 40.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 60.00 80.00 26.96 22.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 2.00 30.00 60.00 91.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 2.00 50.00 55.73 100.00 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 6.00 30.00 32.50 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 257.00 42.00 30.65 32.41 STR184B-006 CULVERTS SH 184 08/06/20 10.00 80.00 110.00 110.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 20.00 30.00 147.57 35.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 4.00 30.90 51.10 30.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 5.00 100.00 149.50 27.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 2.00 120.00 132.38 26.89 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 16.00 33.00 37.46 36.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 57.00 48.98 100.00 47.34 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 10.00 35.00 31.43 35.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 20.00 35.00 42.50 52.00 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 5.00 45.00 56.03 46.62 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 4.00 32.00 29.75 32.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 7.00 26.65 26.65 26.65 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 69.00 50.00 30.52 34.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 115.00 43.82 33.24 37.73 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 937.00 34.61 39.41 32.09 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 389 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00021 Delin (Ty I) (Barrier) Each =================================================== NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 47.00 59.00 50.91 45.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 47.00 59.00 50.91 45.60 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 487.00 35.00 50.43 55.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 487.00 35.00 50.43 55.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 534.00 37.11 50.48 54.45 =============== 612-00022 Delin (Ty II) (Barrier) Each =================================================== NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 12.00 53.00 55.80 51.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12.00 53.00 55.80 51.35 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 120.00 40.00 54.77 60.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 120.00 40.00 54.77 60.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 132.00 41.18 54.86 59.49 =============== 612-00031 Delin (Ty I) (Extra Ht) Each =================================================== NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 49.00 45.00 49.31 45.48 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 49.00 45.00 49.31 45.48 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 125.00 45.00 105.54 51.23 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 1,009.00 45.00 47.07 45.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,134.00 45.00 53.51 45.86 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,183.00 45.00 53.34 45.85 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 390 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00032 Delin (Ty II) (Extra Ht) Each =================================================== NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 46.00 54.00 57.64 54.14 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 46.00 54.00 57.64 54.14 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 80.00 50.00 51.07 50.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 80.00 50.00 51.07 50.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 126.00 51.46 53.47 51.64 =============== 612-00033 Delin (Ty III) (Extra Ht) Each =================================================== NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 149.00 63.00 65.27 62.81 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 149.00 63.00 65.27 62.81 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 32.00 55.00 55.77 55.30 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 12.00 50.00 60.16 50.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 44.00 53.64 56.96 54.09 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 193.00 60.87 63.38 60.82 =============== 612-00036 Delin (Flex) (Sq Base) Each =================================================== STR0101-027 SH 10 Overlay La Junta West 02/27/20 535.00 75.00 80.02 95.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 535.00 75.00 80.02 95.00 SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 26.00 20.00 70.00 70.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 26.00 20.00 70.00 70.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 561.00 72.45 79.86 93.84 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 391 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00037 Delin (Flex) (Flat Mount) Each =================================================== BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 16.00 70.00 96.11 125.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 45.00 70.00 83.23 82.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 17.00 80.00 84.30 85.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 78.00 72.18 87.81 91.47 MPC040-061 R2 FY 21 Sign Replacement 10/01/20 3.00 54.22 77.50 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 54.22 77.50 55.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 81.00 71.51 87.59 90.12 =============== 612-00039 Delin (Flex) (Surf Mount) Each =================================================== IM0761-226 I76/SH52 Interchange 04/02/20 11.00 75.00 118.69 127.20 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 3.00 100.00 146.67 130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 14.00 80.36 121.62 127.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 80.36 121.62 127.80 =============== 612-00041 Delin (Flex) (Ty I) Each =================================================== NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 180.00 25.00 58.88 57.76 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 626.00 40.00 63.59 65.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 110.00 68.00 89.65 85.55 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 200.00 70.00 75.71 78.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,116.00 45.72 69.90 68.19 IM0761-226 I76/SH52 Interchange 04/02/20 99.00 65.00 88.77 116.60 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 3.00 70.00 168.00 279.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 6.00 30.00 114.67 54.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 49.00 100.00 78.63 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 157.00 74.68 86.26 104.33 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 392 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00041 Delin (Flex) (Ty I) Each =================================================== STM094A-038 SH94 WB PASSING LANE 09/01/20 22.00 88.70 88.70 88.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 22.00 88.70 88.70 88.70 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,295.00 49.96 73.40 72.92 =============== 612-00042 Delin (Flex) (Ty II) Each =================================================== NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 50.00 26.00 69.13 68.26 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 4.00 75.00 95.18 91.25 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 100.00 80.00 79.88 89.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 154.00 62.34 78.90 82.32 IM0761-226 I76/SH52 Interchange 04/02/20 27.00 83.00 95.81 118.72 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 43.00 100.00 84.56 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 70.00 93.44 88.55 94.93 STM094A-038 SH94 WB PASSING LANE 09/01/20 9.00 90.92 90.92 90.92 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9.00 90.92 90.92 90.92 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 233.00 72.79 82.51 86.45 =============== 612-00043 Delin (Flex) (Ty III) Each =================================================== NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 150.00 27.00 74.26 73.51 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 29.00 45.00 68.70 70.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 16.00 75.00 100.71 96.95 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 10.00 90.00 84.30 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 205.00 36.37 77.34 76.14 IM0761-226 I76/SH52 Interchange 04/02/20 27.00 87.00 100.42 120.84 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 27.00 87.00 100.42 120.84 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 393 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00043 Delin (Flex) (Ty III) Each =================================================== STM094A-038 SH94 WB PASSING LANE 09/01/20 2.00 48.79 48.79 48.79 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 48.79 48.79 48.79 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 234.00 42.31 83.44 81.06 =============== 612-00050 Reflector (Type-3) Each =================================================== SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 212.00 25.00 45.00 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 212.00 25.00 45.00 45.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 212.00 25.00 45.00 45.00 =============== 612-00052 Reflector Each =================================================== NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 250.00 2.00 36.00 42.00 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 500.00 10.00 6.18 6.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 750.00 7.33 16.12 18.23 SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 705.00 5.00 12.00 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 705.00 5.00 12.00 12.00 SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 787.00 65.00 21.50 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 787.00 65.00 21.50 25.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 500.00 20.00 4.90 5.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 10.00 78.75 78.75 78.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 510.00 21.15 5.19 6.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,752.00 25.79 12.64 16.39 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 394 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00060 Reflector (Median Barrier) Each =================================================== SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 165.00 35.00 45.00 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 165.00 35.00 45.00 45.00 SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 134.00 105.00 40.00 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 134.00 105.00 40.00 20.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 299.00 66.37 41.91 33.80 =============== 612-00070 Reflector Strip (4 In) Each =================================================== NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 411.00 30.00 56.46 51.35 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 130.00 15.00 48.69 63.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 541.00 26.40 52.91 54.17 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 3,711.00 30.00 48.73 50.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,711.00 30.00 48.73 50.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,252.00 29.54 49.44 50.71 =============== 612-00081 Delin (PM) (Ty I) Each =================================================== STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 8.00 60.00 59.85 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 60.00 59.85 55.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 20.00 50.00 85.46 93.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20.00 50.00 85.46 93.90 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 28.00 52.86 82.45 82.79 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 395 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00083 Delin (PM)(Ty III) Each =================================================== STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 5.00 50.00 88.46 93.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 50.00 88.46 93.90 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 50.00 88.46 93.90 =============== 612-00101 Delin (Drv Conc Inst) (Ty I) Each =================================================== STA0142-066 SH 14 New Raymer West 01/09/20 324.00 115.00 110.76 102.04 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 561.00 105.00 117.41 125.00 STA006A-067 SH 6 Merino to Atwood 01/16/20 269.00 115.00 118.81 120.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 189.00 100.00 138.50 240.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,343.00 108.71 118.41 134.64 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 3.00 30.00 115.50 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 30.00 115.50 110.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,346.00 108.54 118.41 134.59 =============== 612-00102 Delin (Drv Conc Inst) (Ty II) Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 151.00 107.00 121.45 130.00 STA006A-067 SH 6 Merino to Atwood 01/16/20 6.00 118.00 124.11 125.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 123.00 100.00 142.83 240.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 280.00 104.16 130.95 178.21 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 7.00 30.00 116.00 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7.00 30.00 116.00 110.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 287.00 102.35 130.70 176.55 =============== 612-00103 Delin (Drv Conc Inst) (Ty III) Each =================================================== STA0142-066 SH 14 New Raymer West 01/09/20 30.00 120.00 116.29 107.14 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 396 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00103 Delin (Drv Conc Inst) (Ty III) Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 99.00 111.00 126.82 136.00 STA006A-067 SH 6 Merino to Atwood 01/16/20 20.00 120.00 129.41 130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 149.00 114.02 124.28 129.38 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 21.00 35.00 116.50 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 21.00 35.00 116.50 110.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 170.00 104.26 123.62 126.99 =============== 612-00111 Delin (Drv)(Ty I) Each =================================================== STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 298.00 100.00 73.00 66.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 44.00 90.00 86.56 76.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 342.00 98.71 74.74 67.29 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 102.00 90.00 91.80 93.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 102.00 90.00 91.80 93.90 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 496.00 37.34 39.95 39.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 496.00 37.34 39.95 39.95 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 940.00 65.38 70.94 55.75 =============== 612-00112 Delin (Drv)(Ty II) Each =================================================== STR2871-038 US 287 Passing Lanes Springfi 03/05/20 20.00 90.00 92.34 81.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 90.00 92.34 81.90 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 81.00 90.00 92.63 93.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 81.00 90.00 92.63 93.90 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 397 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00112 Delin (Drv)(Ty II) Each =================================================== NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 221.00 41.37 44.27 44.27 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 221.00 41.37 44.27 44.27 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 322.00 56.62 78.31 59.09 =============== 612-00113 Delin (Drv)(Ty III) Each =================================================== STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 30.00 90.00 78.50 71.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 8.00 90.00 98.12 87.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 38.00 90.00 82.63 74.53 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 12.00 90.00 93.80 93.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.00 90.00 93.80 93.90 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 101.00 44.40 47.51 47.51 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 101.00 44.40 47.51 47.51 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 151.00 59.50 71.61 58.00 =============== 612-00118 Med Crossover Delin (Drv) Each =================================================== MTCE0253-271 FY20 I-25 SIGN REPL PHASE 1 10/08/20 102.00 100.00 179.33 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 102.00 100.00 179.33 200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 102.00 100.00 179.33 200.00 =============== 612-00260 Loc Mark (Fib Opt)(Dome) Each =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 3.00 165.00 131.06 120.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 398 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00260 Loc Mark (Fib Opt)(Dome) Each =================================================== ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 152.00 125.00 82.96 110.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 8.00 100.00 383.33 370.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 163.00 124.51 92.59 122.94 IM0761-226 I76/SH52 Interchange 04/02/20 8.00 75.00 168.13 183.38 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 11.00 350.00 79.09 71.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 107.00 80.00 198.75 166.00 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 104.00 120.00 70.96 60.00 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 1.00 250.00 112.50 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 231.00 111.43 126.66 114.20 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 22.00 150.00 90.80 60.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 40.00 79.22 79.22 79.22 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 3.00 500.00 100.43 90.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 11.00 129.00 138.03 138.03 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 76.00 123.52 92.07 82.59 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 142.00 150.00 118.70 65.60 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 265.00 100.00 84.75 50.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 2.00 170.10 170.10 170.10 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 20.00 67.43 72.28 72.28 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 429.00 115.36 91.81 56.76 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 899.00 116.70 101.21 85.70 =============== 612-00270 Loc Mark (Util)(Flat Slat) Each =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 3.00 100.00 125.87 115.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 6.00 150.00 65.00 65.00 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 9.00 125.00 68.42 85.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 18.00 129.17 76.70 83.33 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 399 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00270 Loc Mark (Util)(Flat Slat) Each =================================================== ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 41.00 250.00 75.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 41.00 250.00 75.00 100.00 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 10.00 100.00 71.33 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 100.00 71.33 50.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 2.00 75.60 75.60 75.60 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 2.00 88.18 94.52 94.52 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 81.89 85.06 85.06 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 73.00 190.45 74.62 88.22 =============== 612-15000 Inst Marker Each =================================================== NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 12.00 100.00 123.05 123.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12.00 100.00 123.05 123.05 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 100.00 123.05 123.05 =============== 613-00100 1 In Elec Cond Lin Foot =============================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 20.00 10.00 18.48 13.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 10.00 18.48 13.80 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 469.00 20.00 15.33 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 469.00 20.00 15.33 15.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 400 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-00100 1 In Elec Cond Lin Foot =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 179.00 14.00 14.98 14.98 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 179.00 14.00 14.98 14.98 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 100.00 40.00 21.17 25.00 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 200.00 20.00 20.18 19.52 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 300.00 26.67 20.51 21.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 968.00 20.75 17.26 16.94 =============== 613-00102 1 In Elec Cond (GRC) (Special) Lin Foot =============================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 115.00 15.00 50.67 49.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 115.00 15.00 50.67 49.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 375.00 35.91 35.91 35.91 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 375.00 35.91 35.91 35.91 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 490.00 31.00 42.98 38.98 =============== 613-00150 1-1/2 In Elec Cond Lin Foot =============================================== NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 200.00 22.00 75.63 11.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 200.00 22.00 75.63 11.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 200.00 22.00 75.63 11.25 =============== 613-00200 2 In Elec Cond Lin Foot =============================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 2,100.00 12.00 10.87 10.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 401 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-00200 2 In Elec Cond Lin Foot =============================================== NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 100.00 17.00 20.75 14.25 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 656.00 17.00 13.55 17.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 60.00 35.00 53.91 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,916.00 13.77 13.30 12.44 IM0761-226 I76/SH52 Interchange 04/02/20 232.00 12.00 15.20 16.96 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 440.00 30.00 21.00 22.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 274.00 17.00 21.57 20.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 1,430.00 80.00 42.50 28.00 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 1,170.00 20.00 41.35 50.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 340.00 20.00 15.00 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,886.00 42.52 33.66 31.58 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 4,470.85 15.00 16.05 16.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,470.85 15.00 16.05 16.05 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 60.00 50.00 37.71 19.00 FSA1211-098 SH 121 & 1ST AVE 11/19/20 48.00 20.00 28.00 18.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 18,825.00 22.00 23.00 14.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1,035.00 12.55 12.55 12.55 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 480.00 20.75 22.25 22.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 20,448.00 21.57 22.87 14.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 31,720.85 22.49 23.69 16.39 =============== 613-00206 2 In Elec Cond (Bored) Lin Foot =============================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 600.00 25.00 24.49 22.50 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 550.00 25.00 18.67 15.00 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 22,775.00 11.00 9.49 5.74 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 505.00 30.00 69.00 23.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 8,855.00 15.50 20.15 21.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 402 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-00206 2 In Elec Cond (Bored) Lin Foot =============================================== HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 675.00 25.00 25.98 27.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 620.00 22.00 26.68 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 34,580.00 13.37 14.31 11.23 IM0761-226 I76/SH52 Interchange 04/02/20 2,350.00 27.00 17.54 18.39 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 3,400.00 15.00 12.45 12.10 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 2,700.00 18.00 15.20 13.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 540.00 50.00 52.67 56.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 70.00 20.00 78.67 70.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 1,505.00 17.00 19.00 14.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 43,820.00 22.50 13.35 11.47 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 83,155.00 12.25 12.51 10.14 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 390.00 57.00 41.50 50.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 690.00 23.00 17.17 20.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 7,364.00 20.00 13.71 11.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 145,984.00 16.49 13.14 11.23 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 6,110.00 20.00 16.50 15.40 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 2,945.00 15.00 15.75 16.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 345.00 20.00 14.72 13.50 STM094A-038 SH94 WB PASSING LANE 09/01/20 90,460.00 7.56 7.56 7.56 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 3,475.00 25.00 36.14 33.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 1,043.00 6.00 14.53 13.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 2,650.00 27.00 28.89 28.89 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 107,028.00 9.55 14.61 9.67 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 132,060.00 8.50 8.70 5.25 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 350.00 20.00 22.31 27.00 FSA1211-098 SH 121 & 1ST AVE 11/19/20 322.00 19.00 21.67 22.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 2,938.00 14.00 21.50 18.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 890.00 13.87 13.87 13.87 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 5,630.00 17.64 18.91 18.91 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 142,190.00 9.06 8.91 6.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 429,782.00 12.05 11.55 9.18 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 403 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-00207 2 In Elec Cond (Bridge) (Spec) Lin Foot =============================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 280.00 15.00 19.15 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 280.00 15.00 19.15 16.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 280.00 15.00 19.15 16.00 =============== 613-00208 Inst 2 In Elec Cond (Bored) Lin Foot =============================================== NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 285.00 28.00 28.09 28.09 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 285.00 28.00 28.09 28.09 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 285.00 28.00 28.09 28.09 =============== 613-00210 2 In Elec Conduit (Spec) Lin Foot =============================================== NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 7,308.00 50.00 42.50 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 7,308.00 50.00 42.50 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,308.00 50.00 42.50 50.00 =============== 613-00300 3 In Elec Cond Lin Foot =============================================== NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 190.00 20.00 23.00 16.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 116.00 32.00 38.00 38.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 306.00 24.55 25.54 24.34 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 230.00 30.00 25.23 27.70 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 270.00 30.00 17.33 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 500.00 30.00 20.97 23.54 FSA1211-098 SH 121 & 1ST AVE 11/19/20 88.00 27.00 34.00 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 88.00 27.00 34.00 21.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 894.00 27.84 23.65 23.56 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 404 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-00306 3 In Elec Cond (Bored) Lin Foot =============================================== NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 1,920.00 30.00 29.67 25.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 2,860.00 30.00 78.50 27.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 3,050.00 40.00 42.33 41.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 860.00 26.00 21.54 23.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 2,320.00 35.00 28.13 30.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1,240.00 25.00 25.44 23.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12,250.00 32.65 37.64 30.05 IM0761-226 I76/SH52 Interchange 04/02/20 1,675.00 30.00 26.44 28.13 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1,250.00 21.00 24.94 24.20 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 3,600.00 22.00 17.27 15.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 350.00 50.00 64.00 61.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 140.00 25.00 89.00 79.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 3,005.00 20.00 18.00 15.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 1,280.00 25.00 18.67 20.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 3,134.00 15.00 15.75 11.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 14,434.00 21.88 21.29 18.75 STMM086-083 ADA PUEBLO METRO 07/09/20 150.00 40.00 56.50 38.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 2,850.00 16.00 17.25 19.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 810.00 22.00 15.72 13.50 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 500.00 30.00 39.29 36.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 1,133.00 8.00 16.10 13.50 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 750.00 32.00 34.24 34.24 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6,193.00 18.97 23.10 20.95 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 700.00 25.00 23.88 29.00 FSA1211-098 SH 121 & 1ST AVE 11/19/20 644.00 20.00 21.67 18.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 2,871.00 15.00 25.00 23.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 250.00 22.33 22.33 22.33 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 7,420.00 24.38 26.13 26.13 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 11,885.00 21.87 24.90 25.02 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 44,762.00 24.42 26.63 23.81 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 405 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-00400 4 In Elec Cond Lin Foot =============================================== NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 50.00 40.00 396.38 17.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 50.00 40.00 396.38 17.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 40.00 396.38 17.75 =============== 613-00601 6 In Elec Cond (Jacked) Lin Foot =============================================== NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 65.00 55.00 202.79 62.18 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 65.00 55.00 202.79 62.18 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 65.00 55.00 202.79 62.18 =============== 613-01075 3/4 In Elec Cond (P) Lin Foot =============================================== NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 800.00 17.00 17.12 17.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 800.00 17.00 17.12 17.12 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 800.00 17.00 17.12 17.12 =============== 613-01100 1 In Elec Cond (P) Lin Foot =============================================== C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 175.00 20.00 34.50 15.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 345.00 12.00 16.25 16.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 10.00 14.00 55.50 56.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 530.00 14.68 21.35 16.42 IM0761-226 I76/SH52 Interchange 04/02/20 250.00 28.00 26.81 32.86 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 100.00 10.00 12.33 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 350.00 22.86 24.69 26.61 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 420.00 12.00 12.84 12.84 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 420.00 12.00 12.84 12.84 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 406 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-01100 1 In Elec Cond (P) Lin Foot =============================================== NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 2,495.00 12.45 13.34 13.34 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,495.00 12.45 13.34 13.34 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,795.00 13.67 18.73 14.94 =============== 613-01150 1-1/2 In Elec Cond (P) Lin Foot =============================================== NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 14,755.00 10.30 40.50 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 14,755.00 10.30 40.50 20.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14,755.00 10.30 40.50 20.00 =============== 613-01200 2 In Elec Cond (P) Lin Foot =============================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 707.00 20.00 34.00 34.00 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 302,020.00 5.00 3.56 2.89 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 4,550.00 15.00 23.13 20.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 110.00 20.00 29.00 20.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 2,755.00 15.00 19.88 19.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 27,659.00 11.00 14.19 16.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 80.00 16.00 22.50 23.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 330.00 20.00 13.64 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 338,211.00 5.76 5.20 4.41 IM0761-226 I76/SH52 Interchange 04/02/20 10,388.00 15.00 13.27 11.30 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 9,850.00 12.00 9.50 9.35 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 810.00 15.00 12.82 12.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 330.00 12.00 18.00 16.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 435.00 12.00 12.33 13.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 10,780.00 21.00 14.26 13.00 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 96,530.00 11.25 7.62 7.50 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 3,330.00 20.00 21.25 22.50 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 250.00 18.00 13.22 11.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 132,703.00 12.65 9.03 8.83 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 407 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-01200 2 In Elec Cond (P) Lin Foot =============================================== ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 680.00 15.00 14.69 11.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 1,450.00 8.00 11.50 11.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 30.00 25.00 17.33 15.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 40.00 30.81 30.81 30.81 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 180.00 30.00 16.64 15.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 13,150.00 7.00 11.25 11.70 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 2,410.00 13.00 13.91 13.91 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 17,940.00 8.50 11.57 12.00 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 2,761.00 15.00 19.79 12.99 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 537,435.00 3.25 3.24 2.25 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 1,888.00 30.00 15.90 15.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 150.00 13.00 14.75 13.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 2,316.00 12.00 41.25 20.50 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 960.00 10.00 12.50 13.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1,320.00 12.55 12.55 12.55 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 1,190.00 15.00 19.35 22.40 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 37,090.00 14.00 15.01 15.01 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 585,110.00 4.17 3.53 3.31 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,073,964.00 5.79 4.81 4.48 =============== 613-01201 2 In Elec Cond (P) (Spec) Lin Foot =============================================== NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 4,010.00 25.00 38.48 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,010.00 25.00 38.48 40.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,010.00 25.00 38.48 40.00 =============== 613-01202 Inst 2 In Elec Cond (P) Lin Foot =============================================== NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1,680.00 16.95 16.32 16.32 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,680.00 16.95 16.32 16.32 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,680.00 16.95 16.32 16.32 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 408 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-01300 3 In Elec Cond (P) Lin Foot =============================================== NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 380.00 15.00 36.52 25.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 260.00 22.00 37.00 30.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 729.00 35.00 26.00 25.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 927.00 13.00 16.94 18.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 140.00 18.00 24.60 25.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 660.00 20.00 14.48 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,096.00 20.90 20.49 20.98 IM0761-226 I76/SH52 Interchange 04/02/20 50.00 36.00 60.39 68.90 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 150.00 12.00 27.02 26.40 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 900.00 17.00 14.57 14.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 260.00 15.00 25.67 23.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 975.00 15.00 14.25 13.75 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 260.00 17.00 15.87 12.34 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,595.00 16.13 18.93 16.42 STMM086-083 ADA PUEBLO METRO 07/09/20 50.00 21.00 52.50 30.00 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 20.00 20.00 28.93 20.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 685.00 12.00 13.50 13.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 210.00 27.00 15.33 15.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 210.00 35.00 17.64 16.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 80.00 20.00 19.52 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,255.00 19.35 17.17 15.07 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 3,724.00 20.00 25.44 12.25 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 4,240.00 35.00 17.93 16.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 300.00 15.00 18.00 16.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 923.00 13.00 14.50 14.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 10.00 19.07 19.07 19.07 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 335.00 23.86 25.57 25.57 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9,532.00 25.97 20.87 14.68 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16,478.00 22.96 20.18 16.17 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 409 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-01400 4 In Elec Cond (P) Lin Foot =============================================== NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 220.00 50.00 46.80 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 220.00 50.00 46.80 30.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 1,015.00 40.00 43.75 19.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,015.00 40.00 43.75 19.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,235.00 41.78 44.67 21.37 =============== 613-03491 Elec Cond (P) (Mult) Lin Foot =============================================== NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 3,130.00 25.00 25.15 25.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,130.00 25.00 25.15 25.15 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1,560.00 28.00 29.96 29.96 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,560.00 28.00 29.96 29.96 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 66,550.00 30.00 16.17 9.96 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 66,550.00 30.00 16.17 9.96 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 71,240.00 29.74 16.41 11.07 =============== 613-03492 Elec Cond (P)(Mult)(Bored) Lin Foot =============================================== NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 2,735.00 41.00 41.20 41.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,735.00 41.00 41.20 41.20 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 12,475.00 47.00 50.29 50.29 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12,475.00 47.00 50.29 50.29 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 410 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-03492 Elec Cond (P)(Mult)(Bored) Lin Foot =============================================== NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 7,680.00 59.96 43.49 50.14 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 7,680.00 59.96 43.49 50.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 22,890.00 50.63 45.55 49.15 =============== 613-03500 Elec Cond (P) (Mult) (Spec) Lin Foot =============================================== FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 2,200.00 12.00 199.00 177.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,200.00 12.00 199.00 177.00 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 50,065.00 50.00 34.96 43.43 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 50,065.00 50.00 34.96 43.43 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 52,265.00 48.40 41.87 49.05 =============== 613-04010 Conduit LUMP SUM =============================================== NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 1.00 55000.00 132712.50 50266.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 55000.00 132712.50 50266.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 55000.00 132712.50 50266.00 =============== 613-04100 Elect System Mods LUMP SUM =============================================== NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 1.00 30000.00 36367.06 5000.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1.00 5000.00 4299.74 3450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 17500.00 14988.84 4225.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 17500.00 14988.84 4225.00 =============== 613-04120 1 In Elec Cond (Liquidtight Flx Met) Lin Foot =============================================== NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 100.00 30.00 29.44 21.36 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 411 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-04120 1 In Elec Cond (Liquidtight Flx Met) Lin Foot =============================================== NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 5,035.00 32.00 18.00 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5,135.00 31.96 18.33 10.22 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,135.00 31.96 18.33 10.22 =============== 613-04200 2 In Elec Cond (Liquidtight Flx Met) Lin Foot =============================================== NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 100.00 40.00 44.36 50.76 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 100.00 40.00 44.36 50.76 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 100.00 40.00 44.36 50.76 =============== 613-07000 Pull Box (Spec) Each =================================================== C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 4.00 800.00 825.00 650.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 7.00 1500.00 872.00 896.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11.00 1245.45 854.91 806.55 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 26.00 734.62 735.63 735.63 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 26.00 734.62 735.63 735.63 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 10.00 750.00 930.67 850.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 750.00 930.67 850.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 47.00 857.45 844.29 776.56 =============== 613-07001 Type One Pull Box Each =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 4.00 1000.00 944.97 865.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 18.00 1000.00 646.25 500.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 34.00 800.00 985.00 950.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 56.00 878.57 851.29 799.29 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 412 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-07001 Type One Pull Box Each =================================================== IM0761-226 I76/SH52 Interchange 04/02/20 15.00 800.00 723.00 700.66 C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 12.00 850.00 963.42 825.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1.00 1900.00 1872.50 1872.50 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 8.00 900.00 750.10 630.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 36.00 869.44 782.83 759.07 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 30.00 1000.00 943.50 1192.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 42.00 1500.00 1220.00 1200.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 9.00 1500.00 1127.31 1032.54 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 4.00 1200.00 666.14 610.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 1500.00 1605.00 1605.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 86.00 1311.63 1127.04 1156.95 FSA1211-098 SH 121 & 1ST AVE 11/19/20 2.00 900.00 841.33 860.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 25.00 850.00 677.50 755.00 CR100-342 US-6 at Garrison 12/17/20 5.00 800.00 1053.25 600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 32.00 845.31 820.01 737.34 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 210.00 1049.29 959.97 929.43 =============== 613-07002 Type Two Pull Box Each =================================================== NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 2.00 1000.00 1135.00 1290.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 4.00 1000.00 828.38 625.00 STRR300-249 Grand and Jackson Counties AD 03/05/20 8.00 1200.00 1665.00 1500.00 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 4.00 1200.00 1270.00 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 18.00 1133.33 1295.87 1171.11 IM0761-226 I76/SH52 Interchange 04/02/20 21.00 1200.00 1073.81 1016.54 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 413 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-07002 Type Two Pull Box Each =================================================== ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 21.00 1500.00 900.00 900.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 8.00 800.00 899.35 898.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 50.00 1262.00 1011.46 948.67 STMM086-083 ADA PUEBLO METRO 07/09/20 1.00 1200.00 2300.00 2200.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 9.00 1200.00 1300.00 800.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 25.00 1850.00 1717.27 1300.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 7.00 1750.00 2247.30 1896.50 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 5.00 1200.00 845.83 593.50 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 9.00 1800.00 1926.00 1926.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 56.00 1655.36 1705.74 1347.80 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 30.00 1000.00 1555.56 670.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 8.00 1050.00 1278.33 1175.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 10.00 1000.00 1072.50 1240.00 CR100-342 US-6 at Garrison 12/17/20 5.00 1000.00 1327.67 750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 53.00 1007.55 1347.35 861.32 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 177.00 1297.18 1354.43 1071.41 =============== 613-07003 Type Three Pull Box Each =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 1.00 1100.00 1217.45 1115.00 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 16.00 1300.00 1545.00 1725.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 3.00 1400.00 1090.00 1120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 1305.00 1479.87 1603.75 IM0761-226 I76/SH52 Interchange 04/02/20 3.00 800.00 1313.59 1217.94 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 1500.00 1339.51 1303.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 8.00 1100.00 1042.67 965.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 9.00 780.00 1107.45 1239.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 21.00 939.05 1154.70 1134.68 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 414 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-07003 Type Three Pull Box Each =================================================== FSAC010-124 US 40, US 287, SH 88 08/06/20 13.00 2000.00 885.00 960.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 24.00 2400.00 1935.53 1650.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 7.00 1850.00 2218.09 2029.26 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 5.00 2000.00 1106.29 1000.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 2.00 1400.00 936.50 639.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 51.00 2144.12 1680.32 1422.82 FSA1211-098 SH 121 & 1ST AVE 11/19/20 4.00 1500.00 1119.33 1088.00 CR100-342 US-6 at Garrison 12/17/20 5.00 1500.00 1539.17 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9.00 1500.00 1419.21 1039.11 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 101.00 1670.00 1518.25 1364.55 =============== 613-07004 Type Four Pull Box Each =================================================== NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 2.00 1750.00 2626.67 2345.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 6.00 2000.00 1687.50 1275.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 6.00 1300.00 2163.33 2100.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 13.00 1400.00 1039.58 1021.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 3.00 1600.00 1635.00 1680.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 20.00 1400.00 1515.80 1425.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 50.00 1486.00 1400.23 1435.06 IM0761-226 I76/SH52 Interchange 04/02/20 2.00 1500.00 1886.63 1743.70 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 4.00 1500.00 2015.37 1980.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 18.00 1500.00 1486.90 1385.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 14.00 1300.00 1602.33 1520.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 5.00 1400.00 1572.00 1485.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 1.00 950.00 1426.20 1608.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 44.00 1412.50 1661.77 1514.78 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 26.00 2000.00 1757.50 2015.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 415 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-07004 Type Four Pull Box Each =================================================== C R100-288 R1 CURB RAMPS - PH 2 09/03/20 15.00 3500.00 2562.67 2450.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 8.00 3500.00 2613.70 2332.70 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 4.00 3000.00 1401.29 1300.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 2.00 1500.00 1235.83 919.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 55.00 2681.82 2190.88 2088.01 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 19.00 1800.00 2330.98 1684.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 10.00 1500.00 2208.33 2025.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 8.00 1300.00 1717.75 1635.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 43.00 1400.00 1322.50 1245.00 CR100-342 US-6 at Garrison 12/17/20 18.00 1750.00 1788.50 1500.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 12.00 1312.27 1406.74 1406.74 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 110.00 1518.61 1778.02 1479.47 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 259.00 1741.30 1754.21 1606.12 =============== 613-07005 Type Five Pull Box Each =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 3.00 1800.00 2086.52 1910.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 2.00 2600.00 2625.00 1650.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 2.00 1500.00 2816.67 2700.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 4.00 2400.00 1215.65 1160.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1.00 1800.00 2180.00 2240.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 2.00 1500.00 2170.60 2025.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 14.00 2000.00 1764.22 1811.43 IM0761-226 I76/SH52 Interchange 04/02/20 1.00 2500.00 2362.29 2229.18 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 2.00 1500.00 2580.91 2513.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 3.00 1750.00 2145.82 2130.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 4.00 1800.00 2030.33 2134.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 6.00 2200.00 1734.25 2056.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16.00 1946.88 2074.79 2157.39 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 5.00 2500.00 2181.50 2463.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 416 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-07005 Type Five Pull Box Each =================================================== C R100-288 R1 CURB RAMPS - PH 2 09/03/20 2.00 5000.00 3943.10 4585.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 6.00 5000.00 2900.86 2718.32 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 4.00 4500.00 1828.57 1700.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 3.00 1600.00 1535.00 1115.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20.00 3765.00 2485.09 2397.00 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 78.00 2673.08 3159.64 2294.92 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 3.00 2000.00 2968.33 2675.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 1.00 2000.00 2134.50 2084.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 7.00 1850.00 1747.50 1695.00 CR100-342 US-6 at Garrison 12/17/20 5.00 2200.00 2116.67 1500.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 2.00 1987.37 2124.01 2124.01 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 96.00 2546.09 2958.44 2215.90 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 146.00 2595.03 2606.31 2195.51 =============== 613-07010 Pull Box (Surf Mtd) Each =================================================== ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 2.00 1750.00 935.10 950.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 11.00 2000.00 1392.73 1000.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 8.00 2500.00 835.67 711.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 21.00 2166.67 1051.81 885.14 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 36.00 1500.00 1675.50 612.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 36.00 1500.00 1675.50 612.00 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 3.00 1500.00 2378.96 750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 1500.00 2378.96 750.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 60.00 1733.33 1457.88 714.50 =============== 613-07011 Pull Box (11"x18"x12") Each =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 8.00 800.00 2200.00 2200.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 417 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-07011 Pull Box (11"x18"x12") Each =================================================== ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 9.00 950.00 900.67 756.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 6.00 1200.00 985.00 950.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 26.00 1500.00 568.85 568.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 49.00 1247.96 695.99 915.76 IM0761-226 I76/SH52 Interchange 04/02/20 1.00 750.00 722.29 700.66 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1.00 1900.00 1926.00 1926.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 1325.00 872.75 1313.33 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 11.00 1223.25 1223.25 1223.25 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 3.00 767.65 822.92 822.92 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 14.00 1125.62 1137.47 1137.47 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 65.00 1223.98 721.22 975.74 =============== 613-07016 Pull Box (16"x16"x6") Each =================================================== NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 134.00 1900.00 1078.50 732.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 134.00 1900.00 1078.50 732.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 134.00 1900.00 1078.50 732.00 =============== 613-07023 Pull Box (24"x36"x24") Each =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 2.00 1750.00 2800.00 2800.00 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 6.00 1600.00 1797.92 1564.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 39.00 1800.00 1021.15 1021.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 47.00 1772.34 1099.23 1166.02 IM0761-226 I76/SH52 Interchange 04/02/20 6.00 1500.00 1883.06 1743.70 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 418 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-07023 Pull Box (24"x36"x24") Each =================================================== C1601-082 Hawkins Signal and Curb Ramps 04/30/20 1.00 2500.00 4154.67 2600.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 104.00 2000.00 1673.75 1854.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1.00 2400.00 2354.00 2354.00 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 80.00 1900.00 1482.55 1500.00 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 5.00 2500.00 1650.00 1600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 197.00 1961.42 1605.17 1706.76 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 24.00 1800.00 1788.83 1295.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 34.00 2415.61 2415.61 2415.61 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 10.00 2100.00 2247.00 2247.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 68.00 2151.92 1926.56 1995.31 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 230.00 1500.00 1549.55 1000.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 35.00 3700.00 2097.50 1310.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 2.00 1904.70 1904.70 1904.70 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 15.00 2074.73 2224.09 2224.09 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 282.00 1806.49 1583.08 1110.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 594.00 1894.72 1554.30 1413.70 =============== 613-07024 Pull Box (24"x24"x8") Each =================================================== NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 25.00 1000.00 1364.56 1385.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 25.00 1000.00 1364.56 1385.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 276.00 2800.00 1445.00 1020.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 276.00 2800.00 1445.00 1020.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 301.00 2650.50 1432.66 1050.32 =============== 613-07027 Pull Box (28"x28"x12") Each =================================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 3.00 3000.00 2163.33 2100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 3000.00 2163.33 2100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 3000.00 2163.33 2100.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 419 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-07035 Pull Box (32"x24"x12") Each =================================================== NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 19.00 3400.00 2465.00 1305.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 19.00 3400.00 2465.00 1305.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19.00 3400.00 2465.00 1305.00 =============== 613-07040 Pull Box (30"x48"x24") Each =================================================== ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 140.00 1750.00 2046.57 1831.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1.00 3000.00 2816.67 2700.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 22.00 3000.00 1043.57 993.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 163.00 1926.38 1848.37 1723.23 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 4.00 2500.00 2580.91 2513.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 2.00 2500.00 2102.33 1985.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 6.00 2200.00 2340.25 2568.00 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 21.00 2900.00 1861.91 1800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 33.00 2700.00 2077.07 2037.33 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 8.00 2000.00 2324.24 1842.45 STM094A-038 SH94 WB PASSING LANE 09/01/20 6.00 3085.71 3085.71 3085.71 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 4.00 1000.00 7341.51 9280.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 18.00 2139.68 3926.59 3909.66 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 4.00 2608.98 2796.80 2796.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 2608.98 2796.80 2796.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 218.00 2073.62 2029.30 1971.00 =============== 613-07060 Pull Box (18"x30"x18") Deep Each =================================================== C1601-082 Hawkins Signal and Curb Ramps 04/30/20 25.00 1500.00 1650.33 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 25.00 1500.00 1650.33 1100.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 420 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-07060 Pull Box (18"x30"x18") Deep Each =================================================== NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 9.00 1700.00 1307.50 630.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9.00 1700.00 1307.50 630.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 34.00 1552.94 1583.98 975.59 =============== 613-07195 Proof Conduit Lin Foot =============================================== NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 970.00 2.00 2.41 2.41 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 970.00 2.00 2.41 2.41 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 4,780.00 2.00 1.76 1.05 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 6,825.00 3.00 3.21 3.21 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 11,605.00 2.59 2.04 2.32 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 32,305.00 1.50 1.68 1.03 ITSITSB-002 ITS CV ROADSIDE UNITS 11/12/20 6,000.00 4.00 2.65 2.69 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 38,305.00 1.89 1.83 1.29 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50,880.00 2.05 1.88 1.55 =============== 613-07199 Inst Pull Box Each =================================================== NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 17.00 1800.00 1765.50 1765.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 17.00 1800.00 1765.50 1765.50 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 30.00 1490.00 1594.30 1594.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 30.00 1490.00 1594.30 1594.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 47.00 1602.13 1656.22 1656.22 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 421 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-10000 Wiring LUMP SUM =============================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 1.00 20000.00 22546.67 8140.00 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 1.00 12500.00 24263.00 18000.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 1.00 10000.00 11000.00 11000.00 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 1.00 60000.00 19429.57 33000.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 1.00 6000.00 11390.83 12730.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 1.00 200000.00 308082.74 245000.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 1.00 30000.00 33000.00 11000.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1.00 75000.00 30780.00 35000.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1.00 19200.00 54340.11 44000.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1.00 5000.00 14039.00 14558.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1.00 25000.00 15015.00 25500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11.00 42063.64 53463.49 41629.82 IM0761-226 I76/SH52 Interchange 04/02/20 1.00 46100.00 53950.23 60320.36 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 90.00 8341.06 8151.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 1.00 40000.00 51143.33 20350.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 1.00 30000.00 40042.67 25000.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 1.00 25000.00 42554.00 33980.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 1.00 20000.00 38635.67 28850.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 1.00 12000.00 23493.33 13555.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 1.00 30000.00 26547.80 44190.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 25398.75 33277.89 29299.55 STMM086-083 ADA PUEBLO METRO 07/09/20 1.00 5500.00 4750.00 5000.00 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 1.00 25000.00 27429.00 20000.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 1.00 25000.00 39000.00 48000.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 1.00 20000.00 18663.33 15520.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1.00 22000.00 17098.57 20000.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 1.00 75000.00 56697.40 37100.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 1.00 8000.00 14006.33 6000.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 31910.00 34143.70 34143.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 26551.25 28136.70 23220.46 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 1.00 8000.00 4366.67 7500.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 422 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-10000 Wiring LUMP SUM =============================================== NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 1.00 50000.00 184505.78 67216.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 1.00 20000.00 60176.67 60000.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 1.00 6500.00 9533.75 5285.00 FSA1211-098 SH 121 & 1ST AVE 11/19/20 1.00 10000.00 7778.67 6435.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 1.00 694819.00 715103.50 592207.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 1.00 12500.00 57200.00 80400.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1.00 23079.00 23079.00 23079.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 1.00 20000.00 3760.00 1740.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1.00 252079.81 270227.22 270227.22 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 109697.78 95324.70 111408.92 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 37.00 53385.89 51284.34 53842.63 =============== 613-10010 Wiring (Spec) LUMP SUM =============================================== NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 1.00 15000.00 29945.54 22000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 15000.00 29945.54 22000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 15000.00 29945.54 22000.00 =============== 613-13000 Luminaire (LED) (Spec) Each =================================================== NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 6.00 1075.00 845.00 940.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 7.00 1500.00 2500.00 2500.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 2.00 2500.00 1108.50 1200.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 18.00 2100.00 732.32 729.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 33.00 1810.61 830.69 1171.58 IM0761-226 I76/SH52 Interchange 04/02/20 3.00 1000.00 841.57 700.66 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 1000.00 841.57 700.66 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 18.00 800.00 917.50 625.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 2.00 2000.00 736.67 620.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 29.00 800.00 1203.64 1550.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 423 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-13000 Luminaire (LED) (Spec) Each =================================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 14.00 2850.00 3049.50 3049.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 63.00 1293.65 1259.03 1589.41 FSA1211-098 SH 121 & 1ST AVE 11/19/20 4.00 1000.00 950.67 984.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 22.00 2391.67 5481.00 2032.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 21.00 1100.00 937.50 675.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 79.00 653.54 700.59 700.59 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 126.00 1042.43 1962.11 937.79 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 225.00 1224.87 1324.92 1151.37 =============== 613-13006 Lumin (LED) (6,000 Lumens) Each =================================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 6.00 1000.00 1118.33 1100.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 4.00 2100.00 732.15 700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 1440.00 871.18 940.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 4.00 1000.00 716.54 704.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 12.00 1100.00 817.57 775.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16.00 1075.00 770.02 757.25 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 5.00 800.00 964.71 900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 800.00 964.71 900.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 31.00 1148.39 847.62 839.23 =============== 613-13008 Lumin (LED) (8,000 Lumens) Each =================================================== SHE 0703-461 I-70 and Kipling North Phase 03/26/20 9.00 800.00 1319.60 1234.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9.00 800.00 1319.60 1234.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 424 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-13008 Lumin (LED) (8,000 Lumens) Each =================================================== C1601-082 Hawkins Signal and Curb Ramps 04/30/20 4.00 1200.00 741.00 920.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 6.00 1200.00 610.67 539.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 14.00 1000.00 576.33 525.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 4.00 1000.00 987.30 965.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 28.00 1071.43 693.87 647.36 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 4.00 1000.00 613.42 600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 1000.00 613.42 600.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 4.00 1000.00 933.00 646.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 1000.00 933.00 646.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 45.00 1004.44 881.86 760.36 =============== 613-13010 Lumin(LED)(10,000 Lumens) Each =================================================== NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 132.00 2360.00 1865.00 1615.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 132.00 2360.00 1865.00 1615.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 132.00 2360.00 1865.00 1615.00 =============== 613-13014 Lumin (LED) (14,000 Lumens) Each =================================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 15.00 800.00 1058.33 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15.00 800.00 1058.33 1000.00 IM0761-226 I76/SH52 Interchange 04/02/20 25.00 650.00 841.57 700.66 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 25.00 650.00 841.57 700.66 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 425 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-13014 Lumin (LED) (14,000 Lumens) Each =================================================== NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 65.00 3309.20 3547.42 3547.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 65.00 3309.20 3547.42 3547.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 105.00 2317.60 1492.92 2505.70 =============== 613-13020 Lumin (LED) (20,000 Lumens) Each =================================================== FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1.00 948.15 948.15 948.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 948.15 948.15 948.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 948.15 948.15 948.15 =============== 613-13030 Lumin (LED)(30,000 Lumens) Each =================================================== NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 676.00 2400.00 2337.20 2150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 676.00 2400.00 2337.20 2150.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 676.00 2400.00 2337.20 2150.00 =============== 613-13040 Lumin (LED)(40,000 lumens) Each =================================================== NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 282.00 3600.00 2615.00 2270.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 282.00 3600.00 2615.00 2270.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 282.00 3600.00 2615.00 2270.00 =============== 613-13050 Lumin LED (50,000 Lumens) Each =================================================== NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 66.00 4000.00 2810.00 2515.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 66.00 4000.00 2810.00 2515.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 66.00 4000.00 2810.00 2515.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 426 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-13065 Lumin (LED) (5400 Lumen) Each =================================================== FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 2.00 4252.50 4252.50 4252.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 4252.50 4252.50 4252.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 4252.50 4252.50 4252.50 =============== 613-13100 Luminare Mounting Support System LUMP SUM =============================================== NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 1.00 25000.00 76259.10 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 25000.00 76259.10 5000.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 1.00 1099213.00 2005615.00 1846015.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1099213.00 2005615.00 1846015.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 562106.50 719377.74 925507.50 =============== 613-15100 Recessed Light Each =================================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 18.00 2500.00 2675.00 2675.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 18.00 2500.00 2675.00 2675.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18.00 2500.00 2675.00 2675.00 =============== 613-16000 Luminaire (Spec) Each =================================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 6.00 2500.00 898.25 820.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 2500.00 898.25 820.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 7.00 750.00 1173.33 810.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7.00 750.00 1173.33 810.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 427 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-16000 Luminaire (Spec) Each =================================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 12.00 2850.00 3049.50 3049.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.00 2850.00 3049.50 3049.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25.00 2178.00 1288.27 1887.36 =============== 613-20000 Inst Light Std + Lumin Each =================================================== FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 4.00 1438.50 1438.50 1438.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 1438.50 1438.50 1438.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 1438.50 1438.50 1438.50 =============== 613-20200 Inst Lumin Each =================================================== C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 8.00 300.00 255.00 150.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 2.00 300.00 411.00 415.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 300.00 286.20 203.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 8.00 300.00 247.85 232.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 300.00 247.85 232.25 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 18.00 200.00 250.00 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 18.00 200.00 250.00 200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 36.00 250.00 256.65 208.00 =============== 613-20300 Furn Lumin Each =================================================== NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 10.00 1700.00 1532.78 1800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 1700.00 1532.78 1800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 1700.00 1532.78 1800.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 428 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-32300 Light Std Steel (30 Ft) Each =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 5.00 3250.00 7500.00 7500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 3250.00 7500.00 7500.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 3.00 4000.00 3218.33 3730.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 4000.00 3218.33 3730.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 3531.25 4149.13 6086.25 =============== 613-32350 Light Std Steel (35 Ft) Each =================================================== IM0761-226 I76/SH52 Interchange 04/02/20 22.00 4000.00 2858.89 2626.68 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 22.00 4000.00 2858.89 2626.68 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1.00 2500.00 3215.14 2900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 2500.00 3215.14 2900.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 23.00 3934.78 2874.38 2638.56 =============== 613-32400 Light Std Steel (40 Ft) Each =================================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 18.00 5000.00 1987.60 1970.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 18.00 5000.00 1987.60 1970.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 1.00 3500.00 3875.00 4500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 3500.00 3875.00 4500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19.00 4921.05 2013.46 2103.16 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 429 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-34120 Light Std Metal (12 Ft) Each =================================================== NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 5.00 1405.63 1506.83 1506.83 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 1405.63 1506.83 1506.83 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 1405.63 1506.83 1506.83 =============== 613-34300 Light Std Metal (30 Ft) Each =================================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 15.00 3200.00 4333.33 4200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15.00 3200.00 4333.33 4200.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1.00 2856.00 2856.00 2856.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 34.00 1747.96 1873.79 1873.79 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 35.00 1779.62 1901.85 1901.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 2205.73 3269.56 2591.30 =============== 613-34302 Light Std Metal (30 Ft) (2) Each =================================================== NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 15.00 1768.71 1896.04 1896.04 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 15.00 1768.71 1896.04 1896.04 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15.00 1768.71 1896.04 1896.04 =============== 613-34350 Light Std Metal (35 Ft) Each =================================================== STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 13.00 3000.00 3644.15 4310.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 13.00 3000.00 3644.15 4310.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13.00 3000.00 3644.15 4310.00 =============== 613-34400 Light Std Metal (40 Ft) Each =================================================== FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 2.00 4000.00 6009.33 5350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 4000.00 6009.33 5350.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 430 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-34400 Light Std Metal (40 Ft) Each =================================================== STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 16.00 3500.00 3471.14 3910.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 16.00 3500.00 3471.14 3910.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 71.00 2645.28 2835.71 2835.71 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 71.00 2645.28 2835.71 2835.71 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 89.00 2829.38 3298.39 3085.34 =============== 613-40000 Conc Foundation Pad Each =================================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 3.00 1000.00 896.67 860.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 1000.00 896.67 860.00 IM0761-226 I76/SH52 Interchange 04/02/20 3.00 3300.00 734.33 829.98 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 3300.00 734.33 829.98 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 3.00 2740.00 2931.80 2931.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 2740.00 2931.80 2931.80 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 10.00 1000.00 1876.00 540.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 1.00 2500.00 7521.50 8700.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 21.00 444.59 705.98 705.98 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 32.00 682.39 2039.20 903.92 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 41.00 1047.72 1650.23 1043.68 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 431 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-40010 Light Std Foundation Each =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 5.00 1500.00 4000.00 4000.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 15.00 4000.00 1238.33 1200.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 18.00 2100.00 1456.73 1410.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 38.00 2771.05 1471.62 1667.89 IM0761-226 I76/SH52 Interchange 04/02/20 22.00 2750.00 1186.00 955.06 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 2.00 1750.00 2460.33 2180.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 24.00 2666.67 1233.78 1057.14 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1.00 3000.00 1970.71 1800.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 29.00 1500.00 2603.31 3060.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 2740.00 8881.00 8881.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 31.00 1588.39 2613.47 3207.13 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 4.00 2000.00 3333.33 1500.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1.00 1478.40 1478.40 1478.40 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 3.00 2000.00 3218.33 3730.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 126.00 1291.52 1384.49 1384.49 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 134.00 1329.92 1744.29 1441.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 227.00 1747.80 1778.36 1679.68 =============== 613-50010 Photoel Cell Each =================================================== STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 20.00 500.00 132.70 143.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20.00 500.00 132.70 143.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 500.00 132.70 143.00 =============== 613-50100 Lighting Ctrl Center Each =================================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 3.00 15000.00 10958.33 10500.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 432 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-50100 Lighting Ctrl Center Each =================================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1.00 10000.00 9579.08 9100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 13750.00 10309.27 10150.00 IM0761-226 I76/SH52 Interchange 04/02/20 3.00 18000.00 7337.28 8101.58 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 18000.00 7337.28 8101.58 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 3.00 8300.00 588.50 588.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 8300.00 588.50 588.50 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1.00 11203.50 11203.50 11203.50 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 20.00 5285.38 5665.87 5665.87 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 21.00 5567.20 5929.57 5929.57 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 31.00 8090.68 7348.82 6167.46 =============== 613-50105 Lighting Ctrl Center (Pedestal Only) Each =================================================== FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 1.00 7500.00 7020.33 6240.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 7500.00 7020.33 6240.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 3.00 10000.00 6183.81 5740.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 10000.00 6183.81 5740.00 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 10.00 12000.00 4977.80 4800.90 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 1.00 5800.00 6769.17 7830.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 433 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-50105 Lighting Ctrl Center (Pedestal Only) Each =================================================== NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 2.00 13843.65 14840.26 14840.26 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 13.00 11806.72 5779.72 6578.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17.00 11234.55 5966.09 6410.56 =============== 613-50106 Light Cont Center (Spec) Each =================================================== NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 2.00 12450.00 52242.50 49100.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1.00 23859.41 25577.06 25577.06 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 16253.14 46909.41 41259.02 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 16253.14 46909.41 41259.02 =============== 613-50109 Meter Power Pedestal Each =================================================== SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 2.00 10000.00 6348.43 5800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 10000.00 6348.43 5800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 10000.00 6348.43 5800.00 =============== 613-50127 Local Control Station Each =================================================== NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 4.00 1747.96 1873.79 1873.79 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 1747.96 1873.79 1873.79 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 1747.96 1873.79 1873.79 =============== 613-50132 2-Plex Recept. (W/Box & Cover) Each =================================================== STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 20.00 200.00 181.21 164.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20.00 200.00 181.21 164.00 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 2.00 250.00 1749.50 123.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 250.00 1749.50 123.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 22.00 204.55 255.89 160.32 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 434 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-50150 Secondary Serv Pedestal Each =================================================== C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 2.00 4500.00 7500.00 10000.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 3.00 3000.00 8890.00 8600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 3600.00 8462.31 9160.00 IM0761-226 I76/SH52 Interchange 04/02/20 1.00 5000.00 5471.13 6990.70 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 1.00 4000.00 5508.33 4910.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 3.00 5000.00 4384.00 4240.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 4800.00 4823.32 4924.14 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 1.00 9000.00 7277.00 3500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 9000.00 7277.00 3500.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 3.00 6000.00 8290.00 7500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 6000.00 8290.00 7500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 4928.57 6540.68 6887.19 =============== 613-50155 Inst Secondary Serv Pedestal Each =================================================== ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 2.00 1000.00 1355.67 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 1000.00 1355.67 1200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1000.00 1355.67 1200.00 =============== 613-50210 Temporary Lighting LUMP SUM =============================================== NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1.00 67900.00 67945.00 67945.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 67900.00 67945.00 67945.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 435 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-50210 Temporary Lighting LUMP SUM =============================================== NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1.00 106604.86 114279.42 114279.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 106604.86 114279.42 114279.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 87252.43 91112.21 91112.21 =============== 613-50325 Tunnel Lighting Control System LUMP SUM =============================================== NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 1.00 200000.00 494903.70 400000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 200000.00 494903.70 400000.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 1.00 568230.00 551775.00 503900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 568230.00 551775.00 503900.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 384115.00 513860.80 451950.00 =============== 613-50351 PowerTransformer(10KVA,480-120/240V1Ph) Each =================================================== NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 5.00 1162.00 5935.50 3511.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 1162.00 5935.50 3511.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 1162.00 5935.50 3511.00 =============== 613-50365 Transformer Base Each =================================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 18.00 650.00 728.41 800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 18.00 650.00 728.41 800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18.00 650.00 728.41 800.00 =============== 613-50400 Light Std Timber (Temp) Each =================================================== FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 4.00 3214.05 3214.05 3214.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 3214.05 3214.05 3214.05 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 3214.05 3214.05 3214.05 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 436 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-60700 Troubleshooting Hour =================================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 60.00 550.00 588.50 588.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 60.00 550.00 588.50 588.50 ITSITSB-002 ITS CV ROADSIDE UNITS 11/12/20 400.00 135.00 190.67 209.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 60.00 191.91 205.73 205.73 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 460.00 142.42 191.38 208.57 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 520.00 189.45 209.43 252.41 =============== 613-74000 Light Mast Arm Each =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 7.00 1600.00 3000.00 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7.00 1600.00 3000.00 3000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 1600.00 3000.00 3000.00 =============== 613-80130 Service Meter Cabinet Each =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 1.00 6500.00 7480.34 6845.00 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 2.00 4232.00 6871.67 6415.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 1.00 5000.00 7500.00 7500.00 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 4.00 4000.00 5227.18 5600.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 2.00 8000.00 7863.33 7600.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 3.00 4500.00 3773.50 3900.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 2.00 6000.00 5654.20 5350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15.00 5164.27 5285.72 5811.67 C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 3.00 5196.83 5348.27 4585.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 4.00 6000.00 5485.33 4600.00 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 6.00 6000.00 3175.00 2500.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 1.00 5000.00 5491.67 5800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 14.00 5756.46 4681.48 3782.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 437 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-80130 Service Meter Cabinet Each =================================================== ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 4.00 4500.00 5037.67 3000.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 4.00 5500.00 5750.00 6100.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 3.00 5000.00 4345.00 3285.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1.00 6500.00 5349.00 4900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.00 5125.00 5071.92 4262.92 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 1.00 6000.00 5787.00 5898.00 FSA1211-098 SH 121 & 1ST AVE 11/19/20 1.00 5000.00 6118.33 8250.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 5.00 1200.00 5716.50 4863.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 4.00 6000.00 5842.50 6185.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1.00 7072.80 7072.80 7072.80 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 1.00 7000.00 8088.33 9340.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 13.00 4236.37 6281.59 6124.29 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 54.00 5085.69 5284.93 5016.68 =============== 613-81500 Panelboard (5KVA Mini Load Center) Each =================================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 7000.00 2847.38 2777.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 7000.00 2847.38 2777.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 7000.00 2847.38 2777.50 =============== 613-81690 Safety Switch Each =================================================== NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 5.00 2000.00 4626.00 832.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 2000.00 4626.00 832.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 2000.00 4626.00 832.00 =============== 613-81699 Safe Switch NEMA 3R, 30A, 2-pole, 240 V Each =================================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 6.00 180.00 359.62 230.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 180.00 359.62 230.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 180.00 359.62 230.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 438 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-81710 Safety Switch NEMA 3R,100A,2-pole,240V Each =================================================== NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 12.00 2000.00 2010.47 837.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 12.00 2000.00 2010.47 837.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 2000.00 2010.47 837.42 =============== 613-81800 Branch Circuit Panel (Special) Each =================================================== NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 1.00 3000.00 4335.33 1721.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 20.00 4604.00 14148.50 14027.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 21.00 4527.62 13463.86 13441.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21.00 4527.62 13463.86 13441.00 =============== 613-81900 Mobile Light Tower Each =================================================== NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 6.00 8000.00 8609.17 4140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 8000.00 8609.17 4140.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 8000.00 8609.17 4140.00 =============== 614-00011 Sign Panel (CL I) Sq Foot ================================================ STA0142-066 SH 14 New Raymer West 01/09/20 27.00 22.00 22.44 20.50 FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 34.00 25.00 28.35 20.00 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 385.10 40.00 28.33 40.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 175.00 21.00 25.00 25.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 214.00 20.00 21.47 23.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 645.00 15.00 20.98 19.95 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 24.00 27.00 22.50 25.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 60.00 25.00 31.55 26.50 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 320.00 22.50 22.13 20.25 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 581.00 20.00 19.59 21.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 113.00 30.00 29.56 25.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 557.00 20.00 21.50 24.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 521.00 25.00 20.17 22.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 133.00 40.00 28.00 26.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 367.00 24.00 25.56 27.40 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 439 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00011 Sign Panel (CL I) Sq Foot ================================================ NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 163.00 16.00 20.79 18.36 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 241.00 20.00 18.50 18.50 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 11.00 20.00 23.71 24.57 STRR300-249 Grand and Jackson Counties AD 03/05/20 9.00 20.00 44.67 30.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 88.00 25.00 22.00 17.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 298.00 20.00 21.04 20.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 60.00 24.00 27.75 28.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 240.00 25.00 30.12 27.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,266.10 22.89 23.20 23.63 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 146.00 20.00 19.83 19.49 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 126.00 28.00 27.20 25.00 IM0761-226 I76/SH52 Interchange 04/02/20 439.00 20.00 23.59 20.14 SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 2,362.00 18.00 24.00 24.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 254.00 26.00 22.23 20.35 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 129.00 22.09 29.63 26.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 156.00 13.00 27.83 32.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 5.00 30.00 23.56 22.50 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 222.50 25.00 31.83 27.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 7.00 30.00 52.60 50.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 18.00 25.00 37.20 40.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 11.00 24.00 23.78 23.78 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 41.00 23.00 25.50 15.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 39.00 25.00 33.33 30.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 274.00 25.00 26.19 21.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4,229.50 20.01 24.88 23.71 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 20.00 35.00 22.63 30.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 338.00 25.00 31.50 34.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 36.00 25.00 28.37 26.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 9.00 19.96 19.96 19.96 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 75.00 50.00 48.61 37.07 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 275.00 20.00 19.94 21.10 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 102.20 21.00 19.48 17.90 SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 2,497.00 22.00 22.00 18.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 60.00 30.00 36.55 32.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 67.00 25.00 21.72 21.72 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,479.20 23.00 23.64 20.68 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 440 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00011 Sign Panel (CL I) Sq Foot ================================================ MPC040-061 R2 FY 21 Sign Replacement 10/01/20 1,663.00 18.86 16.75 15.00 MTCE0253-271 FY20 I-25 SIGN REPL PHASE 1 10/08/20 602.00 20.00 23.17 18.50 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 14.00 25.00 20.15 19.75 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 30.00 30.00 34.25 25.00 FSA1211-098 SH 121 & 1ST AVE 11/19/20 75.00 30.00 27.67 32.00 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 43.00 50.00 25.04 22.30 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 315.00 35.00 35.50 36.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 96.00 21.32 21.32 21.32 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 965.58 25.23 27.00 27.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,803.58 22.74 22.13 21.01 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16,778.38 22.15 23.55 22.45 =============== 614-00012 Sign Panel (CL II) Sq Foot ================================================ STA0142-066 SH 14 New Raymer West 01/09/20 189.00 26.00 29.00 29.00 FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 127.00 27.00 31.54 22.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 71.00 25.00 30.00 30.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 1,102.00 20.00 26.50 28.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 28.00 35.00 35.38 45.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 1,178.00 20.00 23.05 23.10 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 144.00 27.00 24.00 26.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 164.00 28.00 39.06 33.12 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 18.00 30.00 27.75 25.50 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 532.00 25.00 25.40 26.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 12.00 45.00 33.50 28.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 1,482.00 20.00 23.59 25.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 872.00 25.00 22.27 24.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 2,970.00 29.00 27.45 29.70 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 383.00 18.00 24.14 21.42 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 229.00 25.00 22.50 22.50 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 140.00 20.00 27.77 30.42 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 630.00 30.00 46.08 22.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 535.00 22.00 21.96 22.15 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 92.00 26.00 37.75 38.10 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 194.00 30.00 30.70 27.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11,092.00 24.47 26.77 26.31 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 466.00 24.00 23.33 23.82 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 441 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00012 Sign Panel (CL II) Sq Foot ================================================ IM0761-226 I76/SH52 Interchange 04/02/20 821.00 25.00 26.35 22.26 SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 12,559.00 25.00 29.00 29.00 SFTY2254-091 225 Ramp Improvements 04/09/20 18.00 40.00 34.50 34.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 241.00 25.00 25.77 24.20 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 150.00 23.17 35.57 31.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 76.00 30.00 34.17 31.50 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 174.00 25.00 33.83 38.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 138.00 30.00 28.11 27.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 26.00 30.00 35.83 32.50 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 98.00 35.00 40.33 31.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 41.00 30.00 28.08 25.41 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 14,808.00 25.13 28.19 28.52 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 27.00 40.00 33.38 50.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 326.00 32.00 37.50 40.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 134.00 27.00 39.00 35.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 136.00 22.18 22.18 22.18 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 657.00 20.00 22.54 23.50 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 201.00 23.00 24.51 23.15 SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 17,993.00 25.00 29.50 28.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 25.00 25.00 23.90 23.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 19,499.00 24.94 28.89 28.03 MPC040-061 R2 FY 21 Sign Replacement 10/01/20 5,817.00 21.21 21.00 21.00 MTCE0253-271 FY20 I-25 SIGN REPL PHASE 1 10/08/20 1,965.00 25.00 27.00 22.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 56.00 30.00 28.17 28.50 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 120.00 16.00 47.00 39.00 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 375.00 60.00 33.28 29.75 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 229.00 40.00 42.00 48.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 286.00 25.59 25.59 25.59 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 192.00 25.00 21.63 24.90 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 3,145.00 26.24 28.08 28.08 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 12,185.00 24.82 24.76 24.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 57,584.00 24.87 27.39 27.00 =============== 614-00013 Sign Panel (CL III) Sq Foot ================================================ FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 285.00 35.00 41.05 33.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 442 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00013 Sign Panel (CL III) Sq Foot ================================================ NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 2,250.00 25.00 29.86 32.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 112.00 35.00 34.30 33.60 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 60.00 30.00 33.00 40.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 590.00 35.00 44.88 39.75 STR0101-027 SH 10 Overlay La Junta West 02/27/20 119.00 25.00 32.77 34.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 460.00 32.00 40.40 39.95 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 647.00 25.50 36.07 34.50 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 23.00 28.00 35.53 35.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,546.00 28.03 34.62 34.45 IM0761-226 I76/SH52 Interchange 04/02/20 324.00 30.00 31.79 30.74 SFTY2254-091 225 Ramp Improvements 04/09/20 1,025.00 40.00 35.50 35.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 40.00 30.00 35.02 34.10 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,389.00 37.38 33.66 33.98 SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 280.00 30.00 112.50 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 280.00 30.00 112.50 125.00 MPC040-061 R2 FY 21 Sign Replacement 10/01/20 5,421.00 29.71 30.00 29.00 MTCE0253-271 FY20 I-25 SIGN REPL PHASE 1 10/08/20 962.00 35.00 33.67 31.00 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 934.00 70.00 45.17 42.50 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 32.00 50.00 45.50 48.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 112.00 37.31 37.31 37.31 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 80.00 25.00 37.98 43.50 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 7,051.25 28.25 30.23 30.23 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 14,592.25 32.01 32.49 30.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20,807.25 31.47 34.35 33.06 =============== 614-00014 Lighted Street Name Sign (Inst Only) Each =================================================== SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 8.00 920.00 562.55 76.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 920.00 562.55 76.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 920.00 562.55 76.75 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 443 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00025 Inst Sign Panel (CL I) Sq Foot ================================================ MTCER300-255 MTCE R3 FY20/21 Signal Replac 07/09/20 18,341.00 11.00 10.50 9.00 MTCE0702-386 Grand Junction 09/03/20 891.00 12.00 11.67 14.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 120.00 15.00 20.86 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 19,352.00 11.07 10.65 9.27 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19,352.00 11.07 10.65 9.27 =============== 614-00026 Inst Sign Panel (CL I) Each =================================================== SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 4.00 35.00 243.50 237.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 35.00 243.50 237.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 2.00 250.00 228.60 550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 250.00 228.60 550.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 106.67 237.11 341.33 =============== 614-00027 Inst Sign Panel (CL II) Sq Foot ================================================ MTCER300-255 MTCE R3 FY20/21 Signal Replac 07/09/20 3,043.00 12.00 13.25 11.00 MTCE0702-386 Grand Junction 09/03/20 1,260.00 14.00 14.33 15.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 339.00 24.00 22.14 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,642.00 13.42 14.63 12.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,642.00 13.42 14.63 12.60 =============== 614-00028 Inst Sign Panel (CL III) Sq Foot ================================================ MTCE0702-386 Grand Junction 09/03/20 1,430.00 20.00 20.00 20.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 408.00 12.00 27.71 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,838.00 18.22 23.08 21.11 MPC040-061 R2 FY 21 Sign Replacement 10/01/20 8,133.00 40.00 18.00 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8,133.00 40.00 18.00 18.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,971.00 35.99 19.55 18.57 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 444 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00029 Inst Sign Panel (CL II) Each =================================================== FSAC010-124 US 40, US 287, SH 88 08/06/20 3.00 900.00 304.83 126.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 900.00 304.83 126.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 900.00 304.83 126.00 =============== 614-00035 Sign Panel (Spec) Sq Foot ================================================ NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 120.00 55.00 39.33 50.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 7.00 35.00 49.25 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 127.00 53.90 40.37 50.28 FSA1211-098 SH 121 & 1ST AVE 11/19/20 41.00 50.00 38.00 41.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 41.00 50.00 38.00 41.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 168.00 52.95 39.81 48.01 =============== 614-00037 Sign Panel (Spec) Each =================================================== NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 5.00 180.00 875.25 26.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 180.00 875.25 26.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 180.00 875.25 26.00 =============== 614-00066 Timber Sign Post (6x6 In) Lin Foot =============================================== NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 144.00 10.00 16.30 18.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 144.00 10.00 16.30 18.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 144.00 10.00 16.30 18.60 =============== 614-00200 Steel Sign Post (U-2) Lin Foot =============================================== NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 6.00 30.00 12.50 10.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 445 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00200 Steel Sign Post (U-2) Lin Foot =============================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 37.00 60.00 12.22 22.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 43.00 55.81 12.23 20.54 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 43.00 55.81 12.23 20.54 =============== 614-00214 Steel Sign Post (1.75x1.75 In T) Lin Foot =============================================== SHE 0703-461 I-70 and Kipling North Phase 03/26/20 395.00 11.00 20.20 19.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 395.00 11.00 20.20 19.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 395.00 11.00 20.20 19.00 =============== 614-00216 Steel Sign Post (2x2 In T) Lin Foot =============================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 110.50 15.00 7.71 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 110.50 15.00 7.71 8.00 IM0761-226 I76/SH52 Interchange 04/02/20 20.00 20.00 13.23 10.07 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 21.00 20.00 29.25 16.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 60.00 16.00 16.21 16.21 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 101.00 17.62 17.75 14.95 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 13.00 30.00 42.13 29.64 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 13.00 30.00 42.13 29.64 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 224.50 17.05 15.11 12.38 =============== 614-00220 Steel Sign Post (2.5x2.5 In T) Lin Foot =============================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 797.00 12.00 10.73 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 797.00 12.00 10.73 11.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 446 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00220 Steel Sign Post (2.5x2.5 In T) Lin Foot =============================================== CR100-342 US-6 at Garrison 12/17/20 200.00 16.00 33.33 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 200.00 16.00 33.33 20.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 997.00 12.80 18.29 12.81 =============== 614-00612 Steel Sign Post (W 6x12) Lin Foot =============================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 28.00 54.00 63.41 68.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 28.00 54.00 63.41 68.00 MPC040-061 R2 FY 21 Sign Replacement 10/01/20 26.00 68.58 72.50 70.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 29.00 43.39 46.43 46.43 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 55.00 55.30 63.17 57.57 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 83.00 54.86 63.29 61.09 =============== 614-00615 Steel Sign Post (W 6x15) Lin Foot =============================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 116.00 54.00 63.41 68.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 74.00 47.00 78.12 79.85 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 86.00 65.00 60.44 75.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 276.00 55.55 64.38 73.44 MTCE0702-386 Grand Junction 09/03/20 28.00 60.00 85.00 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 28.00 60.00 85.00 90.00 MPC040-061 R2 FY 21 Sign Replacement 10/01/20 205.00 54.11 82.50 90.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 447 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00615 Steel Sign Post (W 6x15) Lin Foot =============================================== NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 189.60 48.44 51.83 51.83 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 394.60 51.39 72.80 71.66 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 698.60 53.38 67.87 73.10 =============== 614-00818 Steel Sign Post (W 8x18) Lin Foot =============================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 126.00 54.00 79.18 85.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 126.00 54.00 79.18 85.00 MPC040-061 R2 FY 21 Sign Replacement 10/01/20 396.00 74.90 100.00 110.00 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 216.00 80.00 76.73 64.77 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 408.70 52.47 56.14 56.14 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,020.70 67.00 82.15 78.86 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,146.70 65.57 81.64 79.54 =============== 614-00821 Steel Sign Post (W 8x21) Lin Foot =============================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 41.00 54.00 94.95 102.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 73.00 70.00 94.04 96.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 114.00 64.25 94.37 98.77 MPC040-061 R2 FY 21 Sign Replacement 10/01/20 80.00 78.84 125.00 125.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 113.90 55.50 59.39 59.39 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 193.90 65.13 97.72 86.46 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 307.90 64.80 95.86 91.02 =============== 614-01022 Steel Sign Post (W 10x22) Lin Foot =============================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 115.00 54.00 121.12 130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 115.00 54.00 121.12 130.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 448 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01022 Steel Sign Post (W 10x22) Lin Foot =============================================== MTCE0702-386 Grand Junction 09/03/20 46.00 80.00 101.00 108.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 46.00 80.00 101.00 108.00 MPC040-061 R2 FY 21 Sign Replacement 10/01/20 236.00 79.16 135.00 130.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 250.90 63.57 68.02 68.02 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 486.90 71.13 111.75 98.06 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 647.90 68.72 113.20 104.44 =============== 614-01026 Steel Sign Post (W 10x26) Lin Foot =============================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 80.00 54.00 126.48 136.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 80.00 54.00 126.48 136.00 MPC040-061 R2 FY 21 Sign Replacement 10/01/20 42.00 105.96 155.00 150.00 MTCE0253-271 FY20 I-25 SIGN REPL PHASE 1 10/08/20 39.00 140.00 79.00 82.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 140.00 67.61 72.34 72.34 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 221.00 87.67 94.99 88.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 301.00 78.72 108.00 101.35 =============== 614-01226 Steel Sign Post (W 12x26) Lin Foot =============================================== MPC040-061 R2 FY 21 Sign Replacement 10/01/20 49.00 99.48 165.00 160.00 MTCE0253-271 FY20 I-25 SIGN REPL PHASE 1 10/08/20 211.00 150.00 95.50 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 260.00 140.48 104.82 103.19 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 260.00 140.48 104.82 103.19 =============== 614-01401 Steel Sign Support Casting Each =================================================== MTCER300-255 MTCE R3 FY20/21 Signal Replac 07/09/20 566.00 250.00 132.50 10.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 449 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01401 Steel Sign Support Casting Each =================================================== MTCE0702-386 Grand Junction 09/03/20 68.00 175.00 150.00 180.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 634.00 241.96 133.95 28.23 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 634.00 241.96 133.95 28.23 =============== 614-01402 Steel Sign Surf Mnt Base Plate (Slpbase) Each =================================================== SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 278.00 150.00 350.00 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 278.00 150.00 350.00 350.00 SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 18.00 300.00 272.50 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 18.00 300.00 272.50 150.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 296.00 159.12 341.11 337.84 =============== 614-01502 Steel Sign Supp (2-In Rd)(Po&Sock) Lin Foot =============================================== STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 63.00 30.00 27.09 29.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 63.00 30.00 27.09 29.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 63.00 30.00 27.09 29.40 =============== 614-01503 Steel Sign Supp (2-In Rd)(Po&Sock) Each =================================================== STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 32.00 200.00 277.50 255.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 63.00 200.00 236.87 250.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 45.00 200.00 251.12 270.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 34.00 200.00 285.36 320.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 19.00 174.00 294.31 296.50 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 1.00 350.00 289.00 292.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 194.00 198.23 261.09 272.51 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 42.00 200.00 309.50 325.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 450 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01503 Steel Sign Supp (2-In Rd)(Po&Sock) Each =================================================== IM0761-226 I76/SH52 Interchange 04/02/20 34.00 200.00 249.95 307.40 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 6.00 200.00 249.97 220.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 82.00 200.00 263.47 310.02 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 11.00 450.00 329.50 434.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 3.00 275.00 307.33 172.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 2.00 304.93 304.93 304.93 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 21.00 325.00 273.41 294.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 37.00 357.02 283.49 326.32 MPC040-061 R2 FY 21 Sign Replacement 10/01/20 118.00 200.00 200.00 165.00 MTCE0253-271 FY20 I-25 SIGN REPL PHASE 1 10/08/20 65.00 265.00 275.67 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 183.00 223.09 234.23 195.19 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 496.00 219.54 256.22 254.20 =============== 614-01512 Steel Sign Support (2-In Rd)(Post) Lin Foot =============================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 263.00 17.00 35.00 35.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 57.00 13.00 24.41 30.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 105.00 10.00 21.50 24.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 56.00 11.00 18.77 16.32 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 34.00 15.00 15.50 15.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 515.00 14.35 25.32 28.89 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 12.00 16.00 20.78 16.24 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 55.00 10.00 36.58 81.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 67.00 11.07 33.75 69.40 MTCER300-255 MTCE R3 FY20/21 Signal Replac 07/09/20 4,034.00 6.00 13.25 6.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 451 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01512 Steel Sign Support (2-In Rd)(Post) Lin Foot =============================================== NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 138.00 12.00 10.92 10.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 91.00 10.00 16.30 16.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,263.00 6.28 13.14 6.35 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 265.00 13.00 19.00 23.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 805.00 8.07 8.63 8.63 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,070.00 9.29 12.75 12.19 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,915.00 7.58 13.95 10.08 =============== 614-01514 Steel Sign Supp (2-In Rd)(Post)(Painted) Lin Foot =============================================== MTCE0702-386 Grand Junction 09/03/20 315.00 10.00 19.33 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 315.00 10.00 19.33 18.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 315.00 10.00 19.33 18.00 =============== 614-01522 Steel Sign Supp (2-In Rd)(Sock) Each =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 27.00 135.00 150.00 150.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 5.00 100.00 155.56 190.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 114.00 130.00 192.50 127.51 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 3.00 100.00 96.00 96.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 149.00 129.30 186.17 133.05 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 1.00 100.00 153.74 102.87 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 5.00 30.00 145.33 81.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 41.67 146.73 84.65 MTCER300-255 MTCE R3 FY20/21 Signal Replac 07/09/20 101.00 115.00 132.50 95.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 452 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01522 Steel Sign Supp (2-In Rd)(Sock) Each =================================================== MTCE0702-386 Grand Junction 09/03/20 6.00 150.00 225.00 225.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 12.00 140.00 113.32 105.25 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 8.00 51.00 190.11 190.11 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 127.00 114.98 133.50 108.10 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 25.00 130.00 152.50 145.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 78.00 121.09 129.57 129.57 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 103.00 123.25 138.53 133.32 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 385.00 121.59 154.27 124.14 =============== 614-01554 Steel Sign Post (4 In Rd) (Slip) Lin Foot =============================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 36.00 60.00 53.64 42.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 36.00 60.00 53.64 42.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 36.00 60.00 53.64 42.00 =============== 614-01556 Steel Sign Supp(4In RndSch80)(16'-1.75") Each =================================================== MTCE0702-386 Grand Junction 09/03/20 14.00 1800.00 2933.33 4800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 14.00 1800.00 2933.33 4800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 1800.00 2933.33 4800.00 =============== 614-01558 Steel Sign Supp(4In RndSch80)(18'-4.75") Each =================================================== MTCE0702-386 Grand Junction 09/03/20 5.00 1800.00 3000.00 4800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 1800.00 3000.00 4800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 1800.00 3000.00 4800.00 =============== 614-01572 Steel Sign Supp (2-1/2 Rd NP40)(Po&Silp) Lin Foot =============================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 15.00 44.00 27.51 29.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 453 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01572 Steel Sign Supp (2-1/2 Rd NP40)(Po&Silp) Lin Foot =============================================== STRR300-249 Grand and Jackson Counties AD 03/05/20 17.00 60.00 88.00 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 32.00 52.50 59.65 40.16 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 54.00 50.00 37.85 41.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 54.00 50.00 37.85 41.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 86.00 50.93 42.83 40.75 =============== 614-01573 Steel Sign Supp (2-1/2 Rd NP40)(Po&Slip) Each =================================================== NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 8.00 350.00 414.02 378.04 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 2.00 400.00 401.50 383.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 55.00 360.00 405.65 420.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 14.00 400.00 576.33 440.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 100.00 321.00 413.20 420.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 90.00 360.00 398.37 410.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 185.00 410.00 458.81 455.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 10.00 400.00 474.11 491.40 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 53.00 350.00 386.23 437.50 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 7.00 325.00 416.25 420.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 524.00 370.56 426.65 433.52 IM0761-226 I76/SH52 Interchange 04/02/20 69.00 375.00 440.36 503.50 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 2.00 350.00 454.33 485.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 1.00 400.00 405.21 250.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 12.00 412.00 475.65 456.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 84.00 379.99 443.74 493.29 FSAC010-124 US 40, US 287, SH 88 08/06/20 10.00 450.00 455.00 340.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 7.00 443.53 443.53 443.53 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 50.00 350.00 396.84 411.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 67.00 374.70 402.99 403.80 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 454 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01573 Steel Sign Supp (2-1/2 Rd NP40)(Po&Slip) Each =================================================== MPC040-061 R2 FY 21 Sign Replacement 10/01/20 200.00 400.00 362.50 350.00 MTCE0253-271 FY20 I-25 SIGN REPL PHASE 1 10/08/20 153.00 430.00 486.00 385.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 8.00 450.00 516.33 575.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 12.00 400.00 443.00 509.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 373.00 413.38 431.79 374.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,048.00 386.82 428.45 415.33 =============== 614-01575 Steel Sign Supp (2-1/2 In Rd NP40)(Po) Lin Foot =============================================== NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 12.00 10.00 62.20 50.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 90.00 16.00 30.84 30.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 12.00 15.00 19.47 20.40 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 12.00 25.00 17.00 17.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 636.00 25.00 25.42 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 762.00 23.54 26.72 23.28 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 10.00 20.00 44.08 73.25 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 149.00 25.00 94.33 242.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 159.00 24.69 91.17 231.39 MTCER300-255 MTCE R3 FY20/21 Signal Replac 07/09/20 255.00 25.00 21.25 15.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 203.00 22.00 21.39 21.05 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 12.00 20.00 19.55 19.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 470.00 23.58 21.32 17.73 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 34.00 30.00 25.00 30.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 2,227.00 19.17 20.51 20.51 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,261.00 19.33 20.64 20.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,652.00 20.99 27.20 30.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 455 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01578 Steel Sign Supp (2-1/2 In Rd NP40)(Slip) Each =================================================== NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 35.00 300.00 261.47 224.41 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 1.00 250.00 230.00 230.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 56.00 250.00 321.67 270.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 92.00 269.02 298.26 252.22 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 1.00 400.00 561.67 800.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 15.00 250.00 290.33 242.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16.00 259.38 307.29 276.88 MTCER300-255 MTCE R3 FY20/21 Signal Replac 07/09/20 211.00 285.00 352.00 225.00 MTCE0702-386 Grand Junction 09/03/20 60.00 300.00 287.67 258.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 18.00 275.00 271.59 263.10 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 200.00 298.73 298.73 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 290.00 287.19 333.09 234.45 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 4.00 350.00 280.00 260.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 198.50 335.02 358.47 358.47 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 202.50 335.32 355.43 356.52 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 600.50 299.89 329.42 279.47 =============== 614-01582 Steel Sign Supp (2-1/2 In Rd)(Po&Slip) Lin Foot =============================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 25.00 225.00 41.46 32.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 25.00 225.00 41.46 32.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 277.00 300.00 32.43 28.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 277.00 300.00 32.43 28.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 456 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01582 Steel Sign Supp (2-1/2 In Rd)(Po&Slip) Lin Foot =============================================== NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 280.00 11.50 47.50 40.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 80.00 124.12 132.81 132.81 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 360.00 36.53 58.16 60.62 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 662.00 153.89 38.89 45.89 =============== 614-01583 Stl Sign Supp (2-1/2 In Rd 80)(Po&Slip) Each =================================================== NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 12.00 365.00 460.02 420.04 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 7.00 500.00 725.00 1000.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 20.00 750.00 788.71 662.42 FSA2873-194 US 287 Longmont Intersection 02/13/20 1.00 600.00 705.83 605.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 2.00 410.00 466.67 490.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 35.00 460.00 551.55 570.35 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 2.00 425.00 492.09 465.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1.00 345.00 555.00 560.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 80.00 519.94 595.91 604.08 IM0761-226 I76/SH52 Interchange 04/02/20 18.00 557.00 511.29 583.00 SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 1,012.00 450.00 450.00 450.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 63.00 500.00 526.19 484.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 2.00 440.00 642.97 550.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 3.00 600.00 527.00 560.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,098.00 455.01 478.95 454.61 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 6.00 500.00 605.00 685.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 2.00 498.96 498.96 498.96 SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 1,084.00 450.00 550.00 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,092.00 450.36 550.26 501.01 MPC040-061 R2 FY 21 Sign Replacement 10/01/20 90.00 483.08 482.50 480.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 457 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01583 Stl Sign Supp (2-1/2 In Rd 80)(Po&Slip) Each =================================================== NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 12.00 492.00 535.50 450.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 35.00 479.69 479.69 479.69 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 137.00 483.00 489.71 477.29 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,407.00 456.66 521.49 481.92 =============== 614-01585 Steel Sign Supp (2-1/2 In Rd 80)(Post) Lin Foot =============================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 99.00 23.00 40.00 40.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 62.00 22.00 40.98 45.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 68.00 29.00 32.20 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 229.00 24.51 35.50 36.01 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 12.00 25.00 31.20 23.82 SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 2,224.00 25.00 30.00 30.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 15.00 35.00 115.67 295.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 171.00 30.00 23.56 22.50 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 20.00 24.00 37.20 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,442.00 25.40 28.80 31.15 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 156.00 30.00 81.81 20.00 MTCER300-255 MTCE R3 FY20/21 Signal Replac 07/09/20 2,204.00 30.00 26.25 21.00 SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 144.00 30.00 29.00 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,504.00 30.00 29.90 20.88 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 12.00 40.00 31.50 35.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 461.00 25.23 27.00 27.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 473.00 25.60 27.22 27.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,648.00 27.42 29.74 26.47 =============== 614-01587 SteelSgnSupp(2-1/2InRd)(80)(Post)(Paint) Lin Foot =============================================== MTCE0702-386 Grand Junction 09/03/20 1,332.00 30.00 30.33 34.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,332.00 30.00 30.33 34.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,332.00 30.00 30.33 34.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 458 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01588 Steel Sign Supp (2-1/2 In Rd 80)(Slip) Each =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 10.00 400.00 188.00 188.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 5.00 350.00 390.00 385.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15.00 383.33 332.29 253.67 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 1.00 250.00 247.76 247.98 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 1.00 110.00 308.00 295.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 15.00 300.00 430.31 420.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 2.00 320.00 533.33 600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 19.00 289.47 428.07 423.31 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 13.00 300.00 135.50 175.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 13.00 300.00 135.50 175.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 3.00 330.00 280.00 260.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 34.00 365.29 390.86 390.86 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 37.00 362.43 374.23 380.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 84.00 340.00 348.07 335.62 =============== 614-01736 Steel Sign Ground Stub Base (36 In) Each =================================================== SHE 0703-461 I-70 and Kipling North Phase 03/26/20 30.00 100.00 301.00 33.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 30.00 100.00 301.00 33.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 100.00 301.00 33.00 =============== 614-03001 Conc Footing (Ty 1) Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 2.00 1250.00 1159.82 1247.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1250.00 1159.82 1247.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 459 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-03001 Conc Footing (Ty 1) Each =================================================== MPC040-061 R2 FY 21 Sign Replacement 10/01/20 2.00 1854.00 1600.00 1200.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 2.00 1707.37 1826.89 1826.89 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 1780.69 1675.63 1513.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 1603.79 1417.72 1424.63 =============== 614-03002 Conc Footing (Ty 2) Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 8.00 1350.00 1790.90 1928.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 4.00 1330.00 2865.51 2850.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 6.00 1250.00 2720.62 2700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 18.00 1312.22 2475.68 2390.22 MPC040-061 R2 FY 21 Sign Replacement 10/01/20 12.00 1418.83 1950.00 1500.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 12.00 1718.47 1838.76 1838.76 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 24.00 1568.65 1912.92 1669.38 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 42.00 1458.75 2306.85 1978.31 =============== 614-03003 Conc Footing (Ty 3) Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 8.00 1500.00 2106.27 2268.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 1500.00 2106.27 2268.00 MPC040-061 R2 FY 21 Sign Replacement 10/01/20 22.00 2652.25 2000.00 1500.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 22.00 1834.51 1962.93 1962.93 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 44.00 2243.38 1987.64 1731.47 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 52.00 2129.01 2019.28 1814.01 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 460 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-03004 Conc Footing (Ty 4) Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 2.00 2100.00 2632.01 2835.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 4.00 1320.00 4931.01 5700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 1580.00 4164.68 4745.00 MPC040-061 R2 FY 21 Sign Replacement 10/01/20 4.00 2114.38 2425.00 2000.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 6.00 1929.36 2064.43 2064.43 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 2003.37 2270.47 2038.66 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 1844.61 3335.96 3053.54 =============== 614-03005 Conc Footing (Ty 5) Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 6.00 2500.00 3157.74 3402.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 2500.00 3157.74 3402.00 MPC040-061 R2 FY 21 Sign Replacement 10/01/20 11.00 2987.00 2800.00 2500.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 12.00 2536.83 2714.41 2714.41 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 23.00 2752.13 2769.79 2611.87 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 29.00 2699.96 2904.08 2775.34 =============== 614-03006 Conc Footing (Ty 6) Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 4.00 2750.00 3946.18 4252.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 2750.00 3946.18 4252.00 MPC040-061 R2 FY 21 Sign Replacement 10/01/20 2.00 3495.31 3100.00 3000.00 MTCE0253-271 FY20 I-25 SIGN REPL PHASE 1 10/08/20 2.00 4000.00 4608.67 2500.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 461 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-03006 Conc Footing (Ty 6) Each =================================================== NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 6.00 2721.49 2911.99 2911.99 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 3131.96 3595.25 2847.19 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 3022.83 3745.65 3248.57 =============== 614-03007 Conc Footing (Ty 7) Each =================================================== MPC040-061 R2 FY 21 Sign Replacement 10/01/20 2.00 3278.18 3500.00 3500.00 MTCE0253-271 FY20 I-25 SIGN REPL PHASE 1 10/08/20 12.00 2500.00 5673.33 2600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 14.00 2611.17 5456.00 2728.57 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 2611.17 5456.00 2728.57 =============== 614-10015 Overpass Mtd Sign Bracket Each =================================================== MPC040-061 R2 FY 21 Sign Replacement 10/01/20 47.00 2500.00 1975.00 1450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 47.00 2500.00 1975.00 1450.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 47.00 2500.00 1975.00 1450.00 =============== 614-10035 Paint Ground Sign Each =================================================== SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 380.00 50.00 225.00 225.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 380.00 50.00 225.00 225.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 380.00 50.00 225.00 225.00 =============== 614-10050 Mod Overhead Sign Str Each =================================================== SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 14.00 7000.00 7500.00 7500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 14.00 7000.00 7500.00 7500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 7000.00 7500.00 7500.00 =============== 614-10115 Dyn Mesg Sign (Color LED)(O/H) Each =================================================== NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 1.00 140000.00 131242.67 119956.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 462 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-10115 Dyn Mesg Sign (Color LED)(O/H) Each =================================================== NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 2.00 134935.32 144649.45 144649.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 136623.55 136605.38 136418.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 136623.55 136605.38 136418.30 =============== 614-10116 Dyn Msg Sign Ctrl Each =================================================== STM094A-038 SH94 WB PASSING LANE 09/01/20 2.00 22639.69 22639.69 22639.69 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 22639.69 22639.69 22639.69 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 3.00 25000.00 26351.06 24000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 25000.00 26351.06 24000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 24055.88 25979.92 23455.88 =============== 614-10120 Var Mesg Sign Each =================================================== ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 8.00 65000.00 54966.00 50000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 65000.00 54966.00 50000.00 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 4.00 6500.00 6433.33 4500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 6500.00 6433.33 4500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 45500.00 34166.29 34833.33 =============== 614-10127 Var Speed Limit Sign Each =================================================== NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 6.00 30000.00 20022.22 11874.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 30000.00 20022.22 11874.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 30000.00 20022.22 11874.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 463 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-10128 Blankout Sign (Fib Opt) Each =================================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 3.00 12000.00 7651.11 7458.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 12000.00 7651.11 7458.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 12000.00 7651.11 7458.00 =============== 614-10145 VMS LED (Single Faced) Each =================================================== ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 2.00 70000.00 43186.00 36000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 70000.00 43186.00 36000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 70000.00 43186.00 36000.00 =============== 614-10147 VMS LED (Overhead) Each =================================================== ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 1.00 120000.00 60158.00 54000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 120000.00 60158.00 54000.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 7.00 20690.25 22179.76 22179.76 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 7.00 20690.25 22179.76 22179.76 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 33103.97 30619.37 26157.29 =============== 614-10156 12 In LED (Arr) (Green) Each =================================================== SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 134.00 52.00 200.00 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 134.00 52.00 200.00 200.00 SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 369.00 200.00 262.50 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 369.00 200.00 262.50 200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 503.00 160.57 252.90 200.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 464 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-10160 Sig Head B-Plates Each =================================================== FSA2873-194 US 287 Longmont Intersection 02/13/20 18.00 450.00 446.00 335.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 7.00 140.00 236.00 220.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 25.00 363.20 394.60 302.80 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 8.00 250.00 220.50 365.50 SHER400-373 R4 Signal Head Backplate Inst 05/28/20 1,104.00 425.00 387.76 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,112.00 423.74 385.96 399.75 SHER400-379 Signal Head Backplate Install 08/20/20 291.00 410.00 402.50 380.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 291.00 410.00 402.50 380.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,428.00 419.88 389.63 394.03 =============== 614-10170 Traffic Signal Head Visors Each =================================================== SHER400-373 R4 Signal Head Backplate Inst 05/28/20 5,462.00 80.00 45.00 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,462.00 80.00 45.00 30.00 SHER400-379 Signal Head Backplate Install 08/20/20 1,562.00 50.00 45.00 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,562.00 50.00 45.00 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,024.00 73.33 45.00 34.45 =============== 614-10245 LUS LED (Single Faced) Each =================================================== NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 20.00 750.00 10815.00 10405.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 20.00 750.00 10815.00 10405.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 750.00 10815.00 10405.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 465 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-30205 VMS Butterfly Support (Roadside) Each =================================================== ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 8.00 30000.00 26612.50 22000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 30000.00 26612.50 22000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 30000.00 26612.50 22000.00 =============== 614-31800 Monotube Overhead Sign Cant (18 In Dia) Each =================================================== NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 3.00 28932.39 30957.66 30957.66 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 28932.39 30957.66 30957.66 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 28932.39 30957.66 30957.66 =============== 614-32000 Monotube Overhead Sign Cant (20 In Dia) Each =================================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 3.00 50000.00 45192.85 35700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 50000.00 45192.85 35700.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 3.00 28352.17 30336.82 30336.82 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 28352.17 30336.82 30336.82 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 39176.09 43542.18 33018.41 =============== 614-32400 Monotube Overhead Sign Cant (24 In Dia) Each =================================================== ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 1.00 55000.00 55375.00 41000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 55000.00 55375.00 41000.00 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 1.00 50000.00 49388.00 50644.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 2.00 35926.34 38441.18 38441.18 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 40617.56 45009.27 42508.79 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 44213.17 47970.91 42131.59 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 466 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-33600 Monotube Overhead Sign Cantilever(36 In) Each =================================================== NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 8.00 66582.02 71243.00 71243.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8.00 66582.02 71243.00 71243.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 66582.02 71243.00 71243.00 =============== 614-41275 Monotube Overhead Sign Brdg(12.75In Dia) Each =================================================== SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1.00 30000.00 47340.00 50000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 30000.00 47340.00 50000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 30000.00 47340.00 50000.00 =============== 614-42000 Monotube Overhead Sign Brdg (20 In Dia) Each =================================================== NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1.00 69808.27 74694.85 74694.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 69808.27 74694.85 74694.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 69808.27 74694.85 74694.85 =============== 614-42400 Monotube Overhead Sign Brdg (24 In Dia) Each =================================================== SFTY2254-091 225 Ramp Improvements 04/09/20 1.00 150000.00 126500.00 123000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 150000.00 126500.00 123000.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 2.00 87771.95 93915.99 93915.99 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 87771.95 93915.99 93915.99 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 108514.63 110208.00 103610.66 =============== 614-43000 Monotube Overhead Sign Brdg (30 In Dia) Each =================================================== NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1.00 161764.90 173088.44 173088.44 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 161764.90 173088.44 173088.44 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 161764.90 173088.44 173088.44 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 467 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-70000 Prog Traf Sig Face Each =================================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 2.00 5000.00 4243.92 4152.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 5000.00 4243.92 4152.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 5000.00 4243.92 4152.50 =============== 614-70024 1310nm SFP Optic Module Each =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 1.00 375.00 944.97 865.00 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 20.00 500.00 530.46 480.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 21.00 494.05 542.54 498.33 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 2.00 350.00 745.47 726.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 3.00 466.67 416.63 330.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 130.00 500.00 566.50 587.00 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 6.00 400.00 706.20 975.00 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 2.00 400.00 875.00 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 143.00 491.61 578.49 605.61 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 4.00 600.00 497.50 305.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 14.00 618.22 618.22 618.22 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 18.00 614.17 574.32 548.62 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 38.00 500.00 439.68 500.00 ITSITSB-002 ITS CV ROADSIDE UNITS 11/12/20 14.00 600.00 277.67 131.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 11.00 472.00 505.98 505.98 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 63.00 517.33 418.06 419.04 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 245.00 507.44 528.87 544.25 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 468 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-70028 CWDM SFP Optic Module Each =================================================== ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 19.00 1000.00 746.37 552.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 19.00 1000.00 746.37 552.20 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 13.00 2700.00 924.70 681.77 ITSITSB-002 ITS CV ROADSIDE UNITS 11/12/20 28.00 900.00 794.33 575.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 23.00 1218.90 1306.65 1306.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 64.00 1380.23 909.86 859.62 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 83.00 1293.19 838.18 789.25 =============== 614-70030 Optical Attenuator Each =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 1.00 110.00 256.93 235.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 110.00 256.93 235.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 2.00 100.00 164.40 159.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 3.00 96.67 331.93 125.00 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 6.00 120.00 99.20 90.00 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 1.00 125.00 3000.00 4500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12.00 111.25 256.03 477.83 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 19.00 150.00 161.03 169.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 4.00 150.00 212.50 270.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 14.00 189.14 189.14 189.14 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 37.00 164.81 166.96 187.54 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 13.00 100.00 315.26 170.77 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 469 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-70030 Optical Attenuator Each =================================================== ITS ITSB-003 ITS FIBER ON I-76 10/29/20 38.00 120.00 252.17 300.00 ITSITSB-002 ITS CV ROADSIDE UNITS 11/12/20 42.00 100.00 91.67 35.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 34.00 96.48 103.42 103.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 127.00 105.04 198.72 146.51 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 177.00 117.98 197.31 178.05 =============== 614-70032 Optical Filter Each =================================================== ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 4.00 500.00 918.00 753.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 500.00 918.00 753.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 28.00 752.09 806.23 806.23 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 28.00 752.09 806.23 806.23 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 32.00 720.58 857.82 799.58 =============== 614-70117 Ped Sig Face (16) Each =================================================== NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 2.00 600.00 932.33 855.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 600.00 932.33 855.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 600.00 932.33 855.00 =============== 614-70150 Ped Sig Face (16) (Countdown) Each =================================================== NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 12.00 700.00 576.67 690.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 14.00 700.00 800.00 600.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 8.00 800.00 591.67 570.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 6.00 550.00 613.88 630.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 6.00 650.00 666.00 672.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 14.00 750.00 592.40 556.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 60.00 705.00 625.17 613.93 IM0761-226 I76/SH52 Interchange 04/02/20 4.00 800.00 559.13 508.80 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 470 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-70150 Ped Sig Face (16) (Countdown) Each =================================================== C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 20.00 573.10 564.05 455.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 8.00 800.00 695.67 935.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 8.00 700.00 625.33 556.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 28.00 700.00 551.00 451.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 12.00 700.00 671.67 490.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 24.00 650.00 548.04 403.21 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 104.00 675.60 578.28 492.77 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 29.00 700.00 587.50 555.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 10.00 750.00 562.92 440.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 6.00 600.00 523.71 500.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 4.00 650.00 582.92 550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 49.00 693.88 563.05 524.39 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 8.00 700.00 580.25 438.00 FSA1211-098 SH 121 & 1ST AVE 11/19/20 8.00 750.00 519.67 486.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 30.00 600.00 582.50 615.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 12.00 518.68 556.03 556.03 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 58.00 617.66 567.67 560.59 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 271.00 673.01 586.03 539.83 =============== 614-70200 Access Ped Sig Each =================================================== C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 6.00 1800.00 1220.00 1000.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 11.00 1400.00 1685.48 1715.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 17.00 1541.18 1629.62 1462.65 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 12.00 1200.00 1322.67 1400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12.00 1200.00 1322.67 1400.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 8.00 1000.00 1562.50 1515.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 471 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-70200 Access Ped Sig Each =================================================== C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 2.00 2000.00 2198.58 2018.72 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 6.00 1500.00 1676.00 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 16.00 1312.50 1726.14 1572.34 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 45.00 1368.89 1607.63 1484.94 =============== 614-70225 Traf Sig Face (12-12) Each =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 2.00 600.00 796.70 730.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 600.00 796.70 730.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 2.00 560.00 486.86 440.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 560.00 486.86 440.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 580.00 579.81 585.00 =============== 614-70336 Traf Sig Face (12-12-12) Each =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 4.00 900.00 1038.08 950.00 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 25.00 975.00 926.67 1065.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 3.00 1000.00 1234.17 825.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 34.00 1000.00 695.00 70.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 21.00 1200.00 738.33 710.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 24.00 700.00 840.34 843.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 18.00 830.00 864.00 896.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 31.00 800.00 796.80 750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 160.00 916.97 830.21 686.25 IM0761-226 I76/SH52 Interchange 04/02/20 9.00 1000.00 717.86 658.26 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 16.00 800.00 1034.89 731.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 48.00 764.84 777.05 645.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 11.00 1200.00 802.33 809.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 8.00 800.00 985.00 877.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 472 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-70336 Traf Sig Face (12-12-12) Each =================================================== NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 63.00 800.00 724.00 642.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 21.00 950.00 881.67 650.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 39.00 750.00 736.74 811.69 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 215.00 826.57 805.42 698.86 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 57.00 850.00 752.50 755.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 21.00 800.00 853.58 685.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 20.00 800.00 699.29 640.00 SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 3.00 825.00 3750.00 5000.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 11.00 850.00 755.12 650.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 112.00 831.03 800.22 824.73 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 6.00 1000.00 1420.00 1300.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 16.00 700.00 720.75 529.00 FSA1211-098 SH 121 & 1ST AVE 11/19/20 18.00 850.00 793.00 893.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 78.00 800.00 817.50 935.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 24.00 757.28 811.80 811.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 142.00 796.30 827.61 878.53 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 629.00 843.52 815.05 758.63 =============== 614-70448 Traf Sig Face (12-12-12-12) Each =================================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 2.00 1500.00 1113.33 1100.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 6.00 1100.00 906.43 898.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 2.00 1200.00 1332.00 1344.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 6.00 1000.00 1094.20 1026.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16.00 1125.00 1003.89 1027.00 IM0761-226 I76/SH52 Interchange 04/02/20 2.00 1250.00 949.86 827.86 C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 10.00 1125.15 995.00 835.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 4.00 1300.00 978.00 1000.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 4.00 1200.00 1200.00 1050.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 473 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-70448 Traf Sig Face (12-12-12-12) Each =================================================== NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 9.00 1100.00 905.33 835.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 8.00 1200.00 1130.00 875.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 22.00 800.00 895.14 925.68 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 59.00 1031.38 957.70 899.76 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 8.00 1200.00 1030.00 960.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 2.00 1000.00 986.67 904.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 2.00 1000.00 1095.43 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.00 1133.33 1048.22 957.33 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 4.00 1000.00 890.50 696.00 FSA1211-098 SH 121 & 1ST AVE 11/19/20 4.00 1000.00 998.33 1290.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 14.00 950.00 1087.50 1150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 22.00 968.18 1012.11 1092.91 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 109.00 1043.59 983.06 963.76 =============== 614-70560 Traf Sig Face (12-12-12-12-12) Each =================================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 7.00 1700.00 1423.33 1400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7.00 1700.00 1423.33 1400.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 2.00 1500.00 1793.33 1600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 1500.00 1793.33 1600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 1655.56 1505.56 1444.44 =============== 614-72741 Blank Out Sign (LED)(SPD RDR) Each =================================================== FSA2873-194 US 287 Longmont Intersection 02/13/20 1.00 9500.00 18257.50 16000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 9500.00 18257.50 16000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 9500.00 18257.50 16000.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 474 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-72829 Communications Cabinet (Install Only) Each =================================================== IM0761-226 I76/SH52 Interchange 04/02/20 1.00 1500.00 1182.35 979.44 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 1500.00 1182.35 979.44 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1500.00 1182.35 979.44 =============== 614-72830 Communications Cabinet Each =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 1.00 16000.00 15277.04 13995.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 16000.00 15277.04 13995.00 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 2.00 15000.00 14385.94 8156.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 5.00 3000.00 39008.00 37546.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 10.00 11011.64 11804.37 11804.37 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 17.00 9124.49 22863.05 18946.22 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18.00 9506.47 22078.29 18671.15 =============== 614-72832 Comm Cabinet (Type 2) Each =================================================== ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 4.00 12000.00 10934.65 10700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 12000.00 10934.65 10700.00 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 6.00 12500.00 11757.53 9067.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 12500.00 11757.53 9067.50 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 7.00 12000.00 12324.33 9793.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1.00 12401.70 13294.51 13294.51 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8.00 12050.21 12368.43 10230.69 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18.00 12188.98 11718.84 9947.25 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 475 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-72836 Conflict Monitor Each =================================================== SHE 0703-461 I-70 and Kipling North Phase 03/26/20 2.00 900.00 1087.20 1020.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 900.00 1087.20 1020.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 900.00 1041.25 1012.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 3.00 1000.00 1004.53 855.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 975.00 1021.81 894.25 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 2.00 1100.00 1300.00 1100.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1.00 900.00 1171.86 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 1033.33 1218.45 1100.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 1.00 1000.00 1084.50 1010.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1000.00 1084.50 1010.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 980.00 1094.85 992.70 =============== 614-72854 Traf Ctrl Cabinet Each =================================================== C1601-082 Hawkins Signal and Curb Ramps 04/30/20 1.00 20000.00 36570.00 31000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 20000.00 36570.00 31000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 20000.00 36570.00 31000.00 =============== 614-72855 Traf Sig Ctrl Cabinet Each =================================================== NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 2.00 22000.00 18778.33 18585.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 2.00 28000.00 31000.00 27000.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 476 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-72855 Traf Sig Ctrl Cabinet Each =================================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 2.00 22000.00 32590.00 31600.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 2.00 18000.00 23193.34 23000.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1.00 16000.00 24929.00 26092.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 2.00 15000.00 21490.80 19300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11.00 20545.45 24274.31 24096.55 IM0761-226 I76/SH52 Interchange 04/02/20 1.00 19000.00 32296.13 30759.08 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 15000.00 14012.23 15884.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 3.00 14666.67 16464.63 15055.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 1.00 25000.00 45944.67 36240.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 3.00 21000.00 25402.60 23881.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 9.00 18444.44 23933.94 22187.90 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 3.00 16000.00 19500.00 19000.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 3.00 30000.00 29418.33 29910.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1.00 15000.00 16789.29 15250.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 1.00 1900.00 27774.83 26260.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 19362.50 23304.58 23530.06 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 3.00 25000.00 32826.67 28000.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 1.00 17000.00 15508.25 13246.00 FSA1211-098 SH 121 & 1ST AVE 11/19/20 1.00 28500.00 19835.67 17100.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 4.00 18000.00 16960.00 17920.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 2.00 32422.86 34757.00 34757.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 11.00 23395.07 23929.77 23230.91 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 39.00 20621.69 23927.62 23295.73 =============== 614-72860 Ped Push Button Each =================================================== NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 12.00 425.00 260.00 315.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 1.00 700.00 1181.00 2000.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 477 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-72860 Ped Push Button Each =================================================== C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 8.00 400.00 757.50 515.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 8.00 1500.00 353.33 340.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 2.00 260.00 499.50 504.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 14.00 1000.00 219.60 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 45.00 789.33 326.92 365.07 IM0761-226 I76/SH52 Interchange 04/02/20 4.00 500.00 1069.26 1350.44 C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 20.00 422.10 1634.48 1165.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 7.00 600.00 2382.00 2120.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 23.00 900.00 286.67 220.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 24.00 618.00 1158.62 1171.83 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 78.00 643.26 1130.35 983.66 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 10.00 500.00 277.50 350.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 8.00 2000.00 552.33 787.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 3.00 2000.00 528.30 579.49 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 4.00 900.00 391.83 388.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 25.00 1224.00 442.71 523.46 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 1.00 500.00 587.00 535.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 8.00 600.00 293.50 280.00 FSA1211-098 SH 121 & 1ST AVE 11/19/20 2.00 800.00 2607.00 2570.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 30.00 750.00 1012.50 325.00 CR100-342 US-6 at Garrison 12/17/20 5.00 350.00 2640.17 2500.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 12.00 176.35 189.05 189.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 58.00 573.56 1181.95 559.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 206.00 726.02 884.02 673.17 =============== 614-72863 Ped Push Button Post Assem Each =================================================== NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 1.00 2500.00 2890.50 3200.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 11.00 2500.00 2250.00 2000.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 478 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-72863 Ped Push Button Post Assem Each =================================================== STRR300-249 Grand and Jackson Counties AD 03/05/20 1.00 2500.00 6533.33 2500.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1.00 1500.00 2243.33 2200.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1.00 3000.00 2020.39 2200.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 2.00 1800.00 1887.00 1904.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 5.00 2000.00 1554.00 1460.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 22.00 2300.00 2151.82 1964.00 IM0761-226 I76/SH52 Interchange 04/02/20 3.00 2500.00 1417.76 1594.24 C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 20.00 2793.70 1018.97 770.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 40.00 2500.00 2729.33 2300.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 6.00 1500.00 1402.67 1230.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 5.00 2000.00 1316.67 1100.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 3.00 1750.00 985.00 800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 77.00 2436.68 1943.60 1655.36 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 18.00 2400.00 1547.50 1545.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 26.00 3300.00 3485.50 3495.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 15.00 2000.00 2128.24 1949.18 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 4.00 3000.00 1477.43 1300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 63.00 2714.29 2713.33 2430.44 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 1.00 1700.00 2320.00 2150.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 3.00 1600.00 1112.75 1258.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 14.00 2500.00 1305.00 1110.00 CR100-342 US-6 at Garrison 12/17/20 20.00 1850.00 4004.33 3400.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 3.00 985.50 1056.44 1056.44 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 41.00 1986.74 3256.28 2259.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 203.00 2417.15 2538.84 2051.34 =============== 614-72864 Fire Preempt Unit Each =================================================== IM0761-226 I76/SH52 Interchange 04/02/20 1.00 13000.00 8714.97 8695.18 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 13000.00 8714.97 8695.18 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 479 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-72864 Fire Preempt Unit Each =================================================== SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 2.00 3000.00 3536.71 3200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 3000.00 3536.71 3200.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 8.00 2261.46 2424.26 2424.26 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8.00 2261.46 2424.26 2424.26 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 3371.97 4479.76 3135.39 =============== 614-72866 Fire Preempt Unit + Timer Each =================================================== NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 2.00 5000.00 5843.33 4465.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 8.00 4000.00 4279.00 4015.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 4200.00 4483.04 4105.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 2.00 5000.00 6666.67 6800.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 2.00 5000.00 6424.33 5720.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 5000.00 6545.50 6260.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 4.00 3500.00 3958.50 1482.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 3500.00 3958.50 1482.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18.00 4222.22 4704.08 4001.00 =============== 614-72867 Fire Extinguisher Each =================================================== NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 35.00 150.00 1630.00 470.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 35.00 150.00 1630.00 470.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 35.00 150.00 1630.00 470.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 480 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-72868 Bicycle and Ped Traf Count Each =================================================== IM0761-226 I76/SH52 Interchange 04/02/20 1.00 3600.00 10954.66 8028.44 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 3600.00 10954.66 8028.44 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 3600.00 10954.66 8028.44 =============== 614-72875 Loop Detect Wire Lin Foot =============================================== STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 3,640.00 7.00 7.25 7.55 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 950.00 7.00 11.00 2.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 950.00 4.60 9.83 10.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,540.00 6.59 8.33 7.04 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 420.00 6.00 16.25 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 420.00 6.00 16.25 16.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 5,460.00 10.00 10.83 10.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 450.00 5.00 31.71 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5,910.00 9.62 13.35 10.61 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,870.00 8.08 11.68 9.13 =============== 614-72883 Mainline Detection Each =================================================== NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 1.00 5000.00 25047.67 17678.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 5000.00 25047.67 17678.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5000.00 25047.67 17678.00 =============== 614-72884 Detect (Micro Wave) Each =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 2.00 9100.00 9099.65 8330.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 481 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-72884 Detect (Micro Wave) Each =================================================== C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 5.00 9000.00 9800.00 10000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7.00 9028.57 9537.37 9522.86 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 9028.57 9537.37 9522.86 =============== 614-72885 Detect (Spec) Each =================================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 6.00 7500.00 9411.00 9223.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 24.00 9933.33 7903.60 7685.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 6.00 8500.00 10297.78 10200.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 6.00 7000.00 10298.44 9156.67 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 28.00 8000.00 8044.67 7775.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 70.00 8577.14 8613.63 8194.59 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 21.00 8000.00 8117.50 7535.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 21.00 8000.00 8117.50 7535.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 29.00 10000.00 7757.50 7115.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 29.00 10000.00 7757.50 7115.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 120.00 8820.00 8406.30 7818.26 =============== 614-72886 Intersection Detect Sys (Camera) Each =================================================== NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 6.00 8500.00 7848.33 7095.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 8500.00 7848.33 7095.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 6.00 5500.00 11384.00 12525.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 5500.00 11384.00 12525.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 7000.00 9616.17 9810.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 482 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-72887 Detect (Microwave Veh) Each =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 5.00 9300.00 12912.29 11820.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 9.00 11500.00 9333.00 8720.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 14.00 10714.29 10227.82 9827.14 IM0761-226 I76/SH52 Interchange 04/02/20 6.00 7000.00 8790.26 8235.14 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 7000.00 8790.26 8235.14 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 9.00 11000.00 9067.86 8300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9.00 11000.00 9067.86 8300.00 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 5.00 12000.00 10655.33 9966.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 6.00 9000.00 7322.00 6048.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 5.00 12167.26 13043.19 13043.19 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 16.00 10927.27 9108.50 9458.37 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 45.00 10351.92 9353.63 9178.33 =============== 614-72889 Detect (Micro) (Non-Invasive) Each =================================================== FSA1211-098 SH 121 & 1ST AVE 11/19/20 1.00 2000.00 27760.67 29620.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 2000.00 27760.67 29620.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2000.00 27760.67 29620.00 =============== 614-72894 Emergency Telephone Each =================================================== NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 10.00 750.00 3117.50 2040.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 750.00 3117.50 2040.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 750.00 3117.50 2040.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 483 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-72895 Vehicle Detect Sys (Single Camera) Each =================================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 3.00 10000.00 18800.00 18100.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 2.00 9500.00 20679.21 21250.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1.00 12000.00 8725.60 8200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 10166.67 18123.18 17500.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 1.00 10000.00 9267.40 6223.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 10000.00 9267.40 6223.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 3.00 15000.00 9161.33 8969.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 1.00 10800.00 19342.33 19251.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 13950.00 11706.58 11539.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 11527.27 15542.79 14307.36 =============== 614-72896 Inst Intersect Detect Sys (Camera) Each =================================================== SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 8.00 1500.00 2259.85 232.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 1500.00 2259.85 232.25 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 2.00 10000.00 10700.00 10700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 10000.00 10700.00 10700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 3200.00 2661.76 2325.80 =============== 614-73005 Piezo (Elec)(CL II) Each =================================================== STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 10.00 6000.00 3046.50 3173.00 NHPP0502-082 US 50 MONTROSE RE CHIP SEAL 03/05/20 2.00 3000.00 7550.00 2700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12.00 5500.00 4333.21 3094.17 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 484 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-73005 Piezo (Elec)(CL II) Each =================================================== NHPP1601-077 US 160 MP 29.750 - MP 34.891 04/09/20 2.00 3000.00 8333.33 12000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 3000.00 8333.33 12000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 5142.86 5039.12 4366.43 =============== 614-75868 Inst Fire Preempt Unit Each =================================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 2.00 4000.00 758.69 737.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 4000.00 758.69 737.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 4000.00 758.69 737.00 =============== 614-80000 Flash Beacon Each =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 2.00 2700.00 2867.67 2625.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 2700.00 2867.67 2625.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 6.00 1700.00 2754.55 2209.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 1700.00 2754.55 2209.50 FSAC010-124 US 40, US 287, SH 88 08/06/20 1.00 2500.00 2104.33 1388.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 2.00 2600.00 2736.43 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 2566.67 2624.88 2129.33 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 10.00 500.00 8056.50 5963.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 485 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-80000 Flash Beacon Each =================================================== NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1.00 5000.00 5350.00 5350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 11.00 909.09 7927.62 5907.27 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 22.00 1513.64 4201.97 4085.23 =============== 614-80003 Rect Rapid Flash Beacon Each =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 1.00 7000.00 19000.00 19000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 7000.00 19000.00 19000.00 IM0761-226 I76/SH52 Interchange 04/02/20 4.00 9000.00 5377.63 3869.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 9000.00 5377.63 3869.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 4.00 10000.00 4750.00 4500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 10000.00 4750.00 4500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 9222.22 5610.10 5830.67 =============== 614-80004 Flash Beacon (Spec) Each =================================================== NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 4.00 3500.00 811.83 938.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 3500.00 811.83 938.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 3500.00 811.83 938.00 =============== 614-80313 Barricade (Ty 3 F-C) Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 1.00 3817.00 3590.51 3685.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 3817.00 3590.51 3685.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 3817.00 3590.51 3685.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 486 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-80322 Barricade (Ty 3 M-B) Each =================================================== IM0761-226 I76/SH52 Interchange 04/02/20 2.00 400.00 1370.00 1590.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 400.00 1370.00 1590.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 400.00 1370.00 1590.00 =============== 614-80385 Rumble Strip Lin Foot =============================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 66,552.00 0.30 0.24 0.10 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 54,600.00 0.20 0.10 0.11 FSA2873-194 US 287 Longmont Intersection 02/13/20 300.00 8.00 19.00 33.00 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 62,703.00 0.35 0.13 0.15 NHPP0502-082 US 50 MONTROSE RE CHIP SEAL 03/05/20 33,096.00 0.40 0.21 0.20 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 512.00 0.25 6.28 3.22 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 217,763.00 0.32 0.27 0.18 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 900.00 5.00 4.67 6.59 IM0761-226 I76/SH52 Interchange 04/02/20 200.00 2.00 9.63 21.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,100.00 4.45 6.37 9.25 STM094A-038 SH94 WB PASSING LANE 09/01/20 10,560.00 0.92 0.92 0.92 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10,560.00 0.92 0.92 0.92 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 126,506.00 0.50 0.21 0.30 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 60,620.00 0.60 0.25 0.37 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 54,000.00 0.30 0.54 1.45 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 54,912.00 0.40 0.43 0.43 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 296,038.00 0.47 0.34 0.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 525,461.00 0.42 0.34 0.42 =============== 614-80387 Rumble Strip (Grind) Lin Foot =============================================== STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 90,900.00 0.35 0.23 0.11 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 90,900.00 0.35 0.23 0.11 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 90,900.00 0.35 0.23 0.11 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 487 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-80390 Rumble Strip (Grinding)(Asphalt)(Sin) Lin Foot =============================================== STR0101-027 SH 10 Overlay La Junta West 02/27/20 259,958.00 0.35 0.20 0.20 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 19,430.00 0.50 0.74 0.64 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 279,388.00 0.36 0.29 0.23 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 279,388.00 0.36 0.29 0.23 =============== 614-80391 Rumble Strip (Grind)(Asphalt) Lin Foot =============================================== STA0142-066 SH 14 New Raymer West 01/09/20 109,510.00 0.12 0.13 0.13 SHER500-210 R5 FY19 CENTER LINE RUMBLE ST 01/09/20 828,644.00 0.30 0.47 0.42 STA006A-067 SH 6 Merino to Atwood 01/16/20 30,870.00 0.25 0.14 0.17 STR141A-044 SH 141 AND SH 145, FROM SLICK 01/30/20 123,391.00 0.20 0.34 0.30 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 86,127.00 0.25 0.14 0.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,178,542.00 0.27 0.36 0.35 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 156,000.00 0.10 0.12 0.12 NHPP1601-077 US 160 MP 29.750 - MP 34.891 04/09/20 37,155.00 0.35 0.22 0.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 193,155.00 0.15 0.13 0.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,371,697.00 0.25 0.31 0.32 =============== 614-81000 Sig-Light Pole Steel Each =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 1.00 13000.00 7500.71 6855.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1.00 15000.00 15554.00 14720.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 14000.00 12534.02 10787.50 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 4.00 10000.00 8300.00 8100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 10000.00 8300.00 8100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 11333.33 10417.01 8995.83 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 488 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-81020 Sig-Light Pole Steel (2) Each =================================================== NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 2.00 29210.00 32821.67 30955.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 2.00 20000.00 44654.34 47000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 24605.00 41427.25 38977.50 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 1.00 30000.00 24303.33 23000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 30000.00 24303.33 23000.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 3.00 25000.00 30487.50 29975.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 25000.00 30487.50 29975.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 25427.50 37652.72 33604.38 =============== 614-81120 Sig-Light Pole Steel (1-20 Ft) Each =================================================== NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 1.00 17000.00 12287.50 12575.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 17000.00 12287.50 12575.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 17000.00 12287.50 12575.00 =============== 614-81125 Sig-Light Pole Steel (1-25 Ft) Each =================================================== C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 1.00 13000.00 25500.00 16000.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1.00 16000.00 21996.00 20842.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 14500.00 22997.14 18421.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 2.00 18000.00 12874.95 12650.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 1.00 15000.00 26694.00 21910.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 489 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-81125 Sig-Light Pole Steel (1-25 Ft) Each =================================================== FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 1.00 13000.00 14074.00 12500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 16000.00 14922.87 14927.50 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 1.00 17000.00 14000.00 13500.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 1.00 16000.00 12627.00 8838.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 16500.00 13176.20 11169.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 1.00 16500.00 23860.00 22000.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 1.00 17500.00 12360.00 12720.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 4.00 12235.73 13116.58 13116.58 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 13823.82 16529.59 14531.05 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 14924.49 16370.48 14719.74 =============== 614-81130 Sig-Light Pole Steel (1-30 Ft) Each =================================================== C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 2.00 14000.00 26000.00 17000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 14000.00 26000.00 17000.00 IM0761-226 I76/SH52 Interchange 04/02/20 1.00 15000.00 17646.61 16008.12 C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 1.00 14000.00 12537.05 11500.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 3.00 17000.00 13843.67 11355.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 1.00 15000.00 14734.33 13250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 15833.33 14996.98 12470.52 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 1.00 18000.00 14550.00 14100.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 2.00 17000.00 13991.00 10440.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1.00 16000.00 16899.00 15500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 17000.00 15422.60 12620.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 490 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-81130 Sig-Light Pole Steel (1-30 Ft) Each =================================================== SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 1.00 10000.00 12593.25 13491.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 2.00 18000.00 13035.00 13070.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 15333.33 12814.13 13210.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15.00 15800.00 15669.09 13262.27 =============== 614-81135 Sig-Light Pole Steel (1-35 Ft) Each =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 1.00 18000.00 15112.65 13835.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 1.00 15000.00 26500.00 18000.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1.00 18000.00 23288.20 21925.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 17000.00 21477.89 17920.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 1.00 16000.00 24666.67 21000.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 1.00 15000.00 29668.00 23630.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 15500.00 27167.33 22315.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 2.00 18500.00 14825.00 14400.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 1.00 18000.00 14207.00 10058.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1.00 17000.00 17133.14 16000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 18000.00 15846.64 13714.50 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 2.00 19000.00 13117.50 13235.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 2.00 12878.90 13806.05 13806.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 15939.45 13347.02 13520.53 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13.00 16750.60 18881.06 15948.47 =============== 614-81140 Sig-Light Pole Steel (1-40 Ft) Each =================================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 2.00 17000.00 21806.67 21000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 17000.00 21806.67 21000.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 491 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-81140 Sig-Light Pole Steel (1-40 Ft) Each =================================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 20000.00 15380.38 15075.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 1.00 15000.00 13759.00 12777.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 1.00 18000.00 26066.67 22000.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 1.00 18000.00 15092.00 12630.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 1.00 19000.00 16714.00 15555.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 18000.00 16896.90 15607.50 FSAC010-124 US 40, US 287, SH 88 08/06/20 2.00 20000.00 14613.00 10408.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1.00 18000.00 18356.71 17000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 19333.33 16628.85 12605.33 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 1.00 13500.00 14288.50 15429.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 4.00 18000.00 14260.00 14520.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1.00 14362.33 15396.27 15396.27 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 16643.72 14356.17 14817.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 17616.40 16761.22 15422.42 =============== 614-81145 Sig-Light Pole Steel (1-45 Ft) Each =================================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 2.00 18000.00 22046.67 21200.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1.00 16250.00 27122.99 30000.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1.00 15500.00 21400.00 22400.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 4.00 20000.00 25484.00 24000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 18468.75 25048.44 23850.00 IM0761-226 I76/SH52 Interchange 04/02/20 2.00 16000.00 18934.31 17577.98 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 16000.00 18934.31 17577.98 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 492 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-81145 Sig-Light Pole Steel (1-45 Ft) Each =================================================== SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 1.00 19000.00 16100.00 15700.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 1.00 22000.00 16755.00 12375.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1.00 19000.00 18850.43 17500.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 2.00 18000.00 15669.67 14770.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 19200.00 17135.33 15023.00 FSA1211-098 SH 121 & 1ST AVE 11/19/20 1.00 18000.00 16174.67 15050.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 2.00 19000.00 14572.50 14645.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 18666.67 15259.14 14780.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18.00 18430.56 21094.32 19189.50 =============== 614-81150 Sig-Light Pole Steel (1-50 Ft) Each =================================================== NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 1.00 21000.00 15210.00 15380.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1.00 16000.00 21826.50 22845.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1.00 22000.00 26288.80 24750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 19666.67 22072.70 20991.67 C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 4.00 15372.63 14564.83 13500.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 1.00 19000.00 27600.00 23000.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 2.00 20000.00 32756.00 26370.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 1.00 19000.00 15843.67 13350.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 1.00 23000.00 17463.67 16125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 9.00 18054.50 20519.85 17690.56 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 4.00 19500.00 16900.00 16300.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 1.00 22000.00 16206.33 15245.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 20000.00 16710.82 16089.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 493 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-81150 Sig-Light Pole Steel (1-50 Ft) Each =================================================== SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 1.00 15000.00 15043.75 15999.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1.00 15145.54 16235.87 16235.87 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 15072.77 15282.17 16117.44 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19.00 18507.16 19528.17 17624.73 =============== 614-81155 Sig-Light Pole Steel (1-55 Ft) Each =================================================== NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 1.00 22000.00 15584.67 15532.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 2.00 18000.00 28000.00 21000.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1.00 16500.00 29000.45 31500.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1.00 16500.00 22354.00 23180.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1.00 25000.00 26576.40 25052.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 19333.33 25833.98 22877.33 C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 1.00 13695.50 14982.05 13585.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 1.00 21000.00 29166.67 23000.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 1.00 24000.00 17690.00 16500.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 1.00 20000.00 17705.20 20080.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 19673.88 19574.44 18291.25 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 1.00 24000.00 17350.00 16700.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 2.00 20000.00 19565.29 18000.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 1.00 23000.00 16564.00 15547.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 21750.00 18858.21 17061.75 FSA1211-098 SH 121 & 1ST AVE 11/19/20 1.00 20000.00 17765.00 16624.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 1.00 20000.00 15220.00 15440.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 20000.00 16747.00 16032.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 20105.97 21407.18 19421.25 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 494 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-81160 Sig-Light Pole Steel (1-60 Ft) Each =================================================== C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 2.00 25000.00 32500.00 30000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 25000.00 32500.00 30000.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 25000.00 26033.33 25410.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 1.00 30000.00 25619.33 24555.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 27500.00 25920.42 24982.50 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 3.00 27000.00 26250.00 24500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 27000.00 26250.00 24500.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 1.00 23500.00 22657.25 22839.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 1.00 21000.00 24030.00 23060.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 22250.00 23114.83 22949.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 25611.11 26344.95 25484.89 =============== 614-81165 Sig-Light Pole Steel (1-65 Ft) Each =================================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1.00 28000.00 33638.33 32400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 28000.00 33638.33 32400.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 26000.00 26283.87 25690.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 2.00 24000.00 22272.83 20785.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 5.00 22000.00 22325.00 20200.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 5.00 24000.00 24065.20 24220.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 13.00 23384.62 23711.35 22258.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 495 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-81165 Sig-Light Pole Steel (1-65 Ft) Each =================================================== SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 1.00 31000.00 28250.00 26500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 31000.00 28250.00 26500.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 1.00 22000.00 24187.50 23375.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 22000.00 24187.50 23375.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 24062.50 24363.98 23227.22 =============== 614-81170 Sig-Light Pole Steel (1-70 Ft) Each =================================================== SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 1.00 27500.00 26102.40 27095.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 27500.00 26102.40 27095.00 FSA1211-098 SH 121 & 1ST AVE 11/19/20 2.00 30000.00 27137.67 27190.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 30000.00 27137.67 27190.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 29166.67 26667.09 27158.33 =============== 614-81175 Sig-Light Pole Steel (1-75 Ft) Each =================================================== C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 1.00 24995.50 24777.42 23040.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 2.00 33000.00 25027.33 22661.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 5.00 30000.00 26476.20 27548.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 30124.44 26070.63 25762.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 30124.44 26070.63 25762.75 =============== 614-81250 Sig-Light Pole Steel (2-50 Ft) Each =================================================== NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 1.00 20000.00 43316.67 40000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 20000.00 43316.67 40000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 20000.00 43316.67 40000.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 496 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-81555 Sig-Light Pole Steel (2-55&65 Ft) Each =================================================== NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 1.00 30000.00 30987.50 29975.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 30000.00 30987.50 29975.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 30000.00 30987.50 29975.00 =============== 614-82015 Sig Pole Steel (1) (Spec) Each =================================================== C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 2.00 30000.00 43625.20 41750.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 2.00 60000.00 36507.67 34603.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 45000.00 40066.43 38176.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 45000.00 40066.43 38176.50 =============== 614-84000 Traf Sig Ped Pole Steel Each =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 2.00 3500.00 2793.26 2550.00 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 4.00 2800.00 1931.67 1795.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 3.00 4000.00 3576.67 3600.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 7.00 2200.00 2887.30 3000.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1.00 3000.00 3815.00 3920.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 4.00 2391.00 2197.80 2051.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 21.00 2769.71 2718.13 2676.38 C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 9.00 2290.50 1757.67 1250.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 1.00 1500.00 4912.67 4260.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 8.00 2750.00 1686.00 1225.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 4.00 2500.00 2148.33 1550.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 12.00 3000.00 1786.95 955.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 34.00 2650.43 1870.29 1264.09 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 4.00 2700.00 2132.67 1769.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 2700.00 2132.67 1769.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 497 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-84000 Traf Sig Ped Pole Steel Each =================================================== NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 2.00 3000.00 4160.00 3800.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 5.00 3000.00 1590.00 1580.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 2.00 3000.00 18813.33 21750.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 7.00 783.21 839.60 839.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 16.00 2030.15 7785.63 4054.83 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 75.00 2554.15 2946.58 2281.82 =============== 614-84100 Traf Sig Ped Pole Alum Each =================================================== FSAC010-124 US 40, US 287, SH 88 08/06/20 1.00 2200.00 1166.67 945.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 2.00 2000.00 1793.57 1600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 2066.67 1682.94 1381.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 2066.67 1682.94 1381.67 =============== 614-85001 Impact Atten Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 2.00 17500.00 18726.67 20268.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 2.00 25000.00 45000.00 50000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 21250.00 29236.00 35134.00 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 1.00 7000.00 23596.50 16000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 7000.00 23596.50 16000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 18400.00 27624.71 31307.20 =============== 614-85520 Paint Traf Sig Pole Each =================================================== SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 8.00 600.00 1500.00 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 600.00 1500.00 1500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 600.00 1500.00 1500.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 498 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-86006 Telemetry (Master) Each =================================================== ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 4.00 3000.00 3250.00 3500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 3000.00 3250.00 3500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 3000.00 3250.00 3500.00 =============== 614-86007 Serial to IP Converter Each =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 1.00 1650.00 1816.46 1635.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1650.00 1816.46 1635.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1.00 1000.00 1296.43 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1000.00 1296.43 1200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1325.00 1452.44 1417.50 =============== 614-86009 Connected Veh Roadside Unit (Inst Only) Each =================================================== NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 7.00 250.00 3115.48 1100.00 ITSITSB-002 ITS CV ROADSIDE UNITS 11/12/20 407.00 1850.00 1958.67 866.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 414.00 1822.95 1978.23 869.96 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 414.00 1822.95 1978.23 869.96 =============== 614-86105 Telemetry (Field) Each =================================================== NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 2.00 2810.00 3365.00 3595.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 2810.00 3365.00 3595.00 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 4.00 3000.00 3950.00 5500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 3000.00 3950.00 5500.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 499 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-86105 Telemetry (Field) Each =================================================== NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 1.00 3500.00 4193.33 3700.00 FSA1211-098 SH 121 & 1ST AVE 11/19/20 1.00 3500.00 3136.33 775.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 3500.00 3664.83 2237.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 3077.50 3688.95 4208.13 =============== 614-86248 Traf Ctrler (Type 2070LC) Each =================================================== SHE 0703-461 I-70 and Kipling North Phase 03/26/20 2.00 20000.00 5893.20 5467.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 20000.00 5893.20 5467.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 5000.00 6893.83 6710.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 3.00 4833.33 6371.50 6165.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 4875.00 6617.30 6301.25 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 5.00 6500.00 6850.00 6200.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1.00 6000.00 7295.14 6600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 6416.67 7033.29 6266.67 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 1.00 5000.00 6281.00 5978.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 3.00 7000.00 6790.00 6080.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 6500.00 6586.40 6054.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 7750.00 6608.45 6122.31 =============== 614-86250 Ctrler (Ramp Metering) Each =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 1.00 2000.00 2036.54 1865.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 2000.00 2036.54 1865.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 500 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-86250 Ctrler (Ramp Metering) Each =================================================== SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1.00 2000.00 11830.71 11000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 2000.00 11830.71 11000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 2000.00 8892.46 6432.50 =============== 614-86737 Surface Sensor Each =================================================== NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1.00 60167.20 64498.67 64498.67 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 60167.20 64498.67 64498.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 60167.20 64498.67 64498.67 =============== 614-86741 Weather Monitor System Each =================================================== NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 2.00 80000.00 57472.67 55668.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 80000.00 57472.67 55668.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 80000.00 57472.67 55668.00 =============== 614-86748 Ctrler (Ty 2070) Each =================================================== NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 2.00 5000.00 6616.67 5500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 5000.00 6616.67 5500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 5000.00 6616.67 5500.00 =============== 614-86752 Fold-Over Tower (ITS) Each =================================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 31000.00 38261.32 38261.32 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 31000.00 38261.32 38261.32 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 31000.00 38261.32 38261.32 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 501 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-86800 Uninterrupted Power Supply Each =================================================== NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 2.00 7250.00 7310.00 6255.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 2.00 12000.00 6565.20 6200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 9625.00 6844.50 6227.50 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 12000.00 7040.30 6847.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 3.00 7933.33 5962.00 5890.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 8950.00 6469.43 6129.38 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 2.00 10000.00 6875.00 5500.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1.00 15000.00 6769.29 6100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 11666.67 6807.73 5700.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 1.00 4000.00 6565.50 6527.00 FSA1211-098 SH 121 & 1ST AVE 11/19/20 1.00 9000.00 14991.33 14072.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 5.00 70000.00 146753.00 138056.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 4.00 9000.00 6105.00 5210.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 8.00 10736.73 11509.68 11509.68 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 19.00 25520.73 50899.50 43357.71 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 19806.46 25637.15 29677.46 =============== 614-87006 Fiber Optic Term Panel (6 Fiber) Each =================================================== SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 2.00 700.00 631.20 597.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 700.00 631.20 597.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 1.00 838.71 838.71 838.71 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 838.71 838.71 838.71 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 502 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-87006 Fiber Optic Term Panel (6 Fiber) Each =================================================== NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 2.00 1000.00 1419.50 618.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 1000.00 1419.50 618.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 847.74 921.63 653.94 =============== 614-87010 Fiber Optic Cable (S Mode) (12 Fiber) Lin Foot =============================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 2,400.00 10.00 5.47 5.00 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 130.00 12.00 3.17 2.00 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 1,230.00 3.50 6.91 0.99 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 300.00 20.00 10.25 10.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 690.00 7.50 2.44 2.41 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1,760.00 10.80 4.76 4.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6,510.00 9.22 5.10 4.00 IM0761-226 I76/SH52 Interchange 04/02/20 150.00 9.00 36.58 36.04 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 500.00 9.50 5.62 5.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 300.00 4.83 6.67 6.25 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 100.00 5.00 3.42 3.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 35.00 20.00 16.67 19.00 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 750.00 15.00 2.84 2.50 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 175.00 7.00 8.24 10.21 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,010.00 10.56 7.97 7.29 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 7,640.00 4.50 3.64 3.25 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 2,115.00 10.00 4.75 4.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 1,255.00 18.59 18.59 18.59 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 720.00 10.00 9.26 8.50 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 3,650.00 5.00 5.35 5.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 15,380.00 6.78 4.61 5.35 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 2,985.00 4.00 6.37 6.89 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 503 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-87010 Fiber Optic Cable (S Mode) (12 Fiber) Lin Foot =============================================== ITS ITSB-003 ITS FIBER ON I-76 10/29/20 14,510.00 5.00 2.39 0.90 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 450.00 6.00 9.63 8.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 980.00 8.03 8.03 8.03 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 10,675.00 7.88 8.45 8.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 29,600.00 6.05 3.48 4.57 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 53,500.00 6.82 4.26 4.83 =============== 614-87011 Fiber Optic Cable (S Mode) (24 Fiber) Lin Foot =============================================== NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 9,746.00 2.00 7.00 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9,746.00 2.00 7.00 5.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,746.00 2.00 7.00 5.00 =============== 614-87012 Fiber Optic Term Panel (12 Fiber) Each =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 1.00 1000.00 1708.90 1565.00 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 1.00 1200.00 530.00 635.00 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 6.00 700.00 810.82 1200.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 2.00 400.00 1596.05 1733.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 720.00 1088.04 1286.60 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 1000.00 1026.03 1001.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 3.00 916.67 1070.00 860.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 1.00 1300.00 1107.00 1175.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 1.00 1400.00 798.20 796.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 1075.00 1006.01 925.33 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 6.00 1000.00 912.61 558.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 3.00 900.00 933.50 867.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 2.00 7500.00 1209.00 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 11.00 2154.55 988.95 740.82 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 504 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-87012 Fiber Optic Term Panel (12 Fiber) Each =================================================== ITS ITSB-003 ITS FIBER ON I-76 10/29/20 10.00 1000.00 2300.95 625.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 1.00 1000.00 1336.00 794.00 FSA1211-098 SH 121 & 1ST AVE 11/19/20 1.00 1000.00 1128.67 1064.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 12.00 1000.00 2190.85 675.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 39.00 1265.38 1419.48 889.10 =============== 614-87015 Buffer Tube Fan Out Kit Each =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 1.00 300.00 332.82 305.00 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 1.00 120.00 251.67 125.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 2.00 600.00 319.44 316.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 405.00 312.02 265.50 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 300.00 169.39 165.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 3.00 933.33 285.93 145.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 1.00 150.00 643.67 407.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 1.00 650.00 406.33 250.00 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 3.00 300.00 305.30 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 9.00 533.33 306.79 256.33 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 6.00 150.00 106.61 126.50 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 3.00 350.00 155.00 150.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1.00 400.00 155.71 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 235.00 119.55 134.90 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 23.00 381.30 223.67 205.13 =============== 614-87020 Optical Transceiver Each =================================================== NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 5.00 1000.00 9142.50 9385.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 1000.00 9142.50 9385.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 1000.00 9142.50 9385.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 505 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-87024 Fiber Optic Term Panel (24 Fiber) Each =================================================== ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 2.00 1500.00 1145.67 2200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1500.00 1145.67 2200.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 1.00 1700.00 2907.67 1630.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 37.00 1500.00 1402.75 898.00 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 2.00 1500.00 1452.00 1500.00 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 1.00 1000.00 2450.00 1900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 41.00 1492.68 1446.32 969.66 STM094A-038 SH94 WB PASSING LANE 09/01/20 3.00 1094.86 1094.86 1094.86 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 1094.86 1094.86 1094.86 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 11.00 2000.00 1397.79 818.36 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 3.00 1000.00 2035.02 930.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 5.00 3125.00 1435.50 1381.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 10.00 876.57 939.68 939.68 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 29.00 1703.13 1500.13 968.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 75.00 1558.34 1445.35 1007.12 =============== 614-87040 Cable Innerduct (1 In) Lin Foot =============================================== ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 23,455.00 4.00 2.40 1.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 23,455.00 4.00 2.40 1.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 23,455.00 4.00 2.40 1.50 =============== 614-87096 Fiber Optic Termi Panel (96 Fiber) Each =================================================== ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 2.00 2500.00 5285.08 5432.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 2500.00 5285.08 5432.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 2500.00 5285.08 5432.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 506 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-87144 Fiber Optic Termi Panel (144 Fiber) Each =================================================== ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 1.00 8000.00 9127.88 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 8000.00 9127.88 5000.00 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 2.00 10000.00 13508.83 19781.50 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 2.00 7500.00 9144.17 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 8750.00 10599.06 12390.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 8600.00 10279.24 10912.60 =============== 614-87300 TMS Building Each =================================================== ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 1.00 385000.00 312273.00 275000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 385000.00 312273.00 275000.00 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 1.00 300000.00 280855.79 169000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 300000.00 280855.79 169000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 342500.00 295136.34 222000.00 =============== 614-87310 TMS Building Equip LUMP SUM =============================================== ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 1.00 40000.00 71765.00 23000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 40000.00 71765.00 23000.00 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 1.00 75000.00 65336.83 25000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 75000.00 65336.83 25000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 57500.00 68258.73 24000.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 507 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-87312 Traffic Management Sys Bldg Generator LUMP SUM =============================================== ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 1.00 25000.00 53368.00 62000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 25000.00 53368.00 62000.00 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 1.00 50000.00 62462.83 39000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 50000.00 62462.83 39000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 37500.00 58328.82 50500.00 =============== 614-87314 Traffic Management Sys Bldg HVAC Each =================================================== ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 1.00 25000.00 22565.20 6500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 25000.00 22565.20 6500.00 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 1.00 25000.00 26835.50 14000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 25000.00 26835.50 14000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 25000.00 24894.45 10250.00 =============== 614-87316 Traffic Management Sys Bldg UPS Each =================================================== NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 1.00 40000.00 11926.33 4259.00 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 1.00 25000.00 49102.15 42000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 32500.00 36710.21 23129.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 32500.00 36710.21 23129.50 =============== 614-87319 PLC Control Unit Each =================================================== NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 5.00 5000.00 52818.00 48986.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 5000.00 52818.00 48986.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 5000.00 52818.00 48986.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 508 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-87320 CCTV Each =================================================== ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 4.00 4500.00 4840.80 4500.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 2.00 6000.00 4900.00 4700.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 2.00 5000.00 8903.20 8400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 5000.00 5979.11 5525.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 4800.00 6860.79 6682.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 3.00 5666.67 6126.20 6370.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 1.00 5300.00 13051.67 10570.00 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 1.00 5200.00 6250.00 6500.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 1.00 5000.00 5129.40 5170.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7.00 5328.57 6937.93 6861.79 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 7.00 5000.00 5078.98 4056.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 5.00 5500.00 5045.00 4590.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 3.00 15000.00 5460.33 4606.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 2.00 4857.16 4857.16 4857.16 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1.00 5000.00 7165.43 6500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 18.00 6789.68 5325.46 4520.80 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 9.00 6000.00 5410.49 5261.56 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 1.00 6000.00 4834.00 4592.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 19.00 2750.00 9645.00 9750.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 4.00 4460.67 4781.80 4781.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 33.00 3942.20 7548.72 7767.37 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 66.00 4994.05 6438.89 6514.09 =============== 614-87321 CCTV (Inst) Each =================================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 2.00 600.00 4609.24 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 600.00 4609.24 5000.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 509 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-87321 CCTV (Inst) Each =================================================== SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 2.00 2000.00 1150.80 928.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 2000.00 1150.80 928.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 1300.00 3279.07 2964.00 =============== 614-87325 CCTV Pole Each =================================================== NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 7.00 20000.00 7560.92 4497.27 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 7.00 20000.00 7560.92 4497.27 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 20000.00 7560.92 4497.27 =============== 614-87333 CCTV Camera (Traf Surveil) Each =================================================== C1601-082 Hawkins Signal and Curb Ramps 04/30/20 1.00 8000.00 10700.00 6600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 8000.00 10700.00 6600.00 FSA1211-098 SH 121 & 1ST AVE 11/19/20 1.00 9000.00 5923.00 5796.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 2.00 4460.67 4781.80 4781.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 5973.78 5466.52 5119.87 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 6480.34 7429.08 5489.90 =============== 614-87350 Test Fiber Optic Cable LUMP SUM =============================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 1.00 7500.00 7678.33 2535.00 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 1.00 5000.00 921.67 1675.00 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 1.00 20000.00 20177.80 9000.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1.00 10000.00 11960.00 11500.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1.00 1900.00 9327.88 10800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 8880.00 10781.46 7102.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 510 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-87350 Test Fiber Optic Cable LUMP SUM =============================================== IM0761-226 I76/SH52 Interchange 04/02/20 1.00 5000.00 5888.62 6809.44 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 10000.00 6093.62 5940.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 1.00 18000.00 3088.90 3100.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 1.00 550.00 1482.33 1240.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 1.00 20000.00 57545.00 77235.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1.00 7500.00 7490.00 7490.00 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 1.00 10000.00 16123.00 7500.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 1.00 4500.00 3449.60 4738.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 9443.75 12200.44 14256.56 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 1.00 15000.00 9265.50 7114.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 1.00 10000.00 9877.50 7755.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 1.00 9965.05 9965.05 9965.05 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1.00 25000.00 12787.43 11300.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 1.00 20000.00 16573.67 10700.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 35870.00 38380.90 38380.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 19305.84 13593.39 14202.49 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 1.00 25000.00 29488.33 31465.00 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 1.00 12500.00 20625.83 8500.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 1.00 2000.00 2982.25 3454.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 1.00 5000.00 9360.50 8171.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 1.00 6000.00 5265.00 8130.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1.00 9544.50 9544.50 9544.50 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1.00 12344.65 13233.35 13233.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 7.00 10341.31 14535.68 11785.41 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26.00 11852.85 12652.34 12202.89 =============== 614-87364 CCTV Pole w Low Dev (50 Ft) Each =================================================== ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 4.00 20000.00 23269.60 24000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 20000.00 23269.60 24000.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 511 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-87364 CCTV Pole w Low Dev (50 Ft) Each =================================================== ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 6.00 25000.00 20355.11 17130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 25000.00 20355.11 17130.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 2.00 7074.84 7584.16 7584.16 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 7074.84 7584.16 7584.16 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 20345.81 20919.73 17829.03 =============== 614-87402 Brkaway Taper ITS Pole Steel (40 Ft) Each =================================================== NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 3.00 3584.10 3842.12 3842.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 3584.10 3842.12 3842.12 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 3584.10 3842.12 3842.12 =============== 614-87448 Fiber Optic Cable (S Mode) (48 S) Lin Foot =============================================== ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 4,800.00 6.00 2.49 1.01 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,800.00 6.00 2.49 1.01 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 68,400.00 6.00 2.60 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 68,400.00 6.00 2.60 3.00 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 8,040.00 5.00 1.96 1.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8,040.00 5.00 1.96 1.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 81,240.00 5.90 2.50 2.73 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 512 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-87496 Fiber Optic Cable (S Mode) (96 S) Lin Foot =============================================== ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 168,260.00 2.25 2.43 1.42 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 6,800.00 6.00 5.77 5.50 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 12,280.00 9.50 2.48 2.37 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 187,340.00 2.86 2.51 1.63 IM0761-226 I76/SH52 Interchange 04/02/20 5,300.00 4.00 3.85 4.06 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 99,745.00 4.00 3.08 1.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 105,045.00 4.00 3.13 1.87 STM094A-038 SH94 WB PASSING LANE 09/01/20 47,760.00 3.22 3.22 3.22 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1,500.00 6.00 11.00 10.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 8,000.00 3.00 5.32 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 57,260.00 3.26 4.94 3.93 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 329,730.00 2.50 2.51 1.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 329,730.00 2.50 2.51 1.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 679,375.00 2.90 2.67 1.80 =============== 614-87498 Fiber Optic Cable (S Mode) (144 S) Lin Foot =============================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 18,000.00 6.00 5.10 4.95 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 18,000.00 6.00 5.10 4.95 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 211,085.00 3.00 3.53 3.56 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 211,085.00 3.00 3.53 3.56 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 229,085.00 3.24 3.82 3.67 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 513 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-87499 Fiber Optic Cable (S Mode) (Inst) Lin Foot =============================================== NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 24,760.00 3.20 3.21 3.21 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 24,760.00 3.20 3.21 3.21 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 65,445.00 4.00 4.28 4.28 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 65,445.00 4.00 4.28 4.28 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 90,205.00 3.78 3.99 3.99 =============== 614-87502 Fiber Optic Cable (S Mode)(168 S) Lin Foot =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 22,120.00 6.00 6.42 6.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 22,120.00 6.00 6.42 6.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 22,120.00 6.00 6.42 6.42 =============== 614-87512 Splice FO Cable (12 S) Each =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 1.00 1700.00 1250.21 1145.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1700.00 1250.21 1145.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 1600.00 2092.71 2035.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 3.00 2660.00 1688.17 1735.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 1.00 2200.00 1656.33 2100.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 1.00 3000.00 1981.20 1617.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 2463.33 1872.41 1826.17 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 3.00 2000.00 1600.00 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 2000.00 1600.00 1200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 2248.00 1769.44 1570.20 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 514 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-87524 Splice FO Cable (24 Strand) Each =================================================== FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 1.00 2500.00 19632.00 14830.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 2500.00 19632.00 14830.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2500.00 19632.00 14830.00 =============== 614-87596 Splice Fiber Optic Cable (96 Strand) Each =================================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 3.00 1000.00 4812.47 5350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 1000.00 4812.47 5350.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 1000.00 4812.47 5350.00 =============== 614-87612 Term FO Cable (12 S) Each =================================================== SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 1.00 3000.00 994.40 416.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 3000.00 994.40 416.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 3000.00 994.40 416.00 =============== 614-87690 Ethernet Switch Each =================================================== NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 2.00 5000.00 4151.67 3655.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 2.00 4510.00 7984.00 7520.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 4755.00 6546.88 5587.50 IM0761-226 I76/SH52 Interchange 04/02/20 1.00 3500.00 3084.50 1100.28 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 3500.00 3084.50 1100.28 FSAC010-124 US 40, US 287, SH 88 08/06/20 3.00 5000.00 4779.00 4785.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 5000.00 4779.00 4785.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 515 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-87690 Ethernet Switch Each =================================================== FSA1211-098 SH 121 & 1ST AVE 11/19/20 1.00 5000.00 2758.33 3715.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 5000.00 2758.33 3715.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 4724.44 5075.07 4613.36 =============== 614-87691 Ethernet Switch Type I Each =================================================== ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 2.00 5000.00 7663.87 8700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 5000.00 7663.87 8700.00 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 1.00 6500.00 5250.00 4500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 6500.00 5250.00 4500.00 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 1.00 5000.00 10788.00 14978.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 5000.00 10788.00 14978.00 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 2.00 3500.00 12529.92 21531.00 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 2.00 3750.00 5460.17 5000.00 ITSITSB-002 ITS CV ROADSIDE UNITS 11/12/20 6.00 4000.00 3819.00 3192.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 3850.00 5817.88 7221.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 4285.71 6690.93 7792.29 =============== 614-87692 Ethernet Switch Type II Each =================================================== ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 4.00 4500.00 5194.54 9100.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 516 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-87692 Ethernet Switch Type II Each =================================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 2.00 3500.00 10509.45 11350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 4166.67 7556.72 9850.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 4000.00 9337.90 9130.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 3.00 3700.00 7140.75 7750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 3775.00 8174.70 8095.00 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 6.00 5000.00 4925.92 3978.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 5.00 4000.00 5200.00 4400.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 5.00 4636.66 4636.66 4636.66 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 2.00 2000.00 8386.00 7600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 18.00 4287.96 5691.08 4680.63 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 11.00 5000.00 5064.88 1106.46 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 9.00 4500.00 11178.63 5000.00 ITSITSB-002 ITS CV ROADSIDE UNITS 11/12/20 8.00 4000.00 3631.00 2955.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 1.00 5750.00 6307.50 3345.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 5.00 3000.00 7953.50 8037.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 12.00 6483.53 6950.29 6950.29 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 46.00 4914.18 7635.76 4516.19 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 74.00 4639.67 7164.83 5182.11 =============== 614-87693 Ethernet Switch Type III Each =================================================== ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 2.00 7000.00 4447.22 9500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 7000.00 4447.22 9500.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 42.00 7000.00 3281.25 1622.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 517 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-87693 Ethernet Switch Type III Each =================================================== SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 1.00 7000.00 8042.40 9730.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 43.00 7000.00 3418.86 1810.56 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 1.00 6000.00 7774.33 7935.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 6000.00 7774.33 7935.00 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 3.00 5000.00 5535.17 9000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 5000.00 5535.17 9000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 49.00 6857.14 3720.05 2689.57 =============== 614-87697 Ethernet Agg Switch Type I Each =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 1.00 10000.00 9696.25 8875.00 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 1.00 10000.00 12276.73 8700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 10000.00 11309.05 8787.50 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 1.00 33000.00 7316.33 3049.00 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 1.00 30000.00 32123.33 27500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 31500.00 23854.33 15274.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 20750.00 17950.67 12031.00 =============== 614-87698 Ethernet Agg Switch Type II Each =================================================== ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 1.00 25000.00 21164.58 9200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 25000.00 21164.58 9200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 25000.00 21164.58 9200.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 518 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-87699 Ethernet Agg Switch Type III Each =================================================== ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 1.00 35000.00 28350.78 9700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 35000.00 28350.78 9700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 35000.00 28350.78 9700.00 =============== 614-87700 Ethernet Router Each =================================================== ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 14.00 100.00 593.50 62.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 14.00 100.00 593.50 62.00 FSA1211-098 SH 121 & 1ST AVE 11/19/20 1.00 1000.00 2109.33 3755.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1000.00 2109.33 3755.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15.00 160.00 670.58 308.20 =============== 614-87704 Ethernet Radio (Single Client) Each =================================================== NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 2.00 3500.00 3361.67 1585.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 3500.00 3361.67 1585.00 IM0761-226 I76/SH52 Interchange 04/02/20 1.00 3000.00 3098.89 2634.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 3000.00 3098.89 2634.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 3333.33 3220.17 1934.70 =============== 614-87708 Cellular Modem (CDMA) Each =================================================== ITSITSB-002 ITS CV ROADSIDE UNITS 11/12/20 7.00 3000.00 2971.00 1243.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 7.00 3000.00 2971.00 1243.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 3000.00 2971.00 1243.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 519 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 615-00030 Emb Prot Ty 3 Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 51.00 1650.00 2021.21 2523.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 6.00 1300.00 1484.94 1400.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 57.00 1613.16 1919.06 2404.79 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 2.00 2000.00 1287.56 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 2000.00 1287.56 1200.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1.00 2000.00 4699.14 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 2000.00 4699.14 1500.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 33.00 1149.78 1277.71 1277.71 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 33.00 1149.78 1277.71 1277.71 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 93.00 1461.21 1866.14 1969.22 =============== 615-00050 Emb Prot Ty 5 Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 12.00 2200.00 3051.48 6146.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 1.00 1000.00 1977.00 285.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 6.00 3000.00 1460.00 1500.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 2.00 3000.00 2716.67 2500.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 7.00 1800.00 3183.09 3300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 28.00 2285.71 2885.31 3969.18 IM0761-226 I76/SH52 Interchange 04/02/20 2.00 1500.00 2938.19 1017.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 3.00 4200.00 2322.04 1100.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 520 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 615-00050 Emb Prot Ty 5 Each =================================================== FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 3120.00 2549.05 1066.80 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 2.00 5000.00 3975.00 4950.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 1.00 1900.00 3321.43 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 3966.67 3559.09 3333.33 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 8.00 3500.00 3149.50 3102.97 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 2.00 2735.90 2735.90 2735.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 3347.18 3117.69 3029.56 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 46.00 2716.78 2888.87 3407.97 =============== 615-21509 15 In Sl Hdgate (9 Ft) Each =================================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 4.00 2681.46 1768.83 1768.83 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 2681.46 1768.83 1768.83 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 2681.46 1768.83 1768.83 =============== 615-50000 Parshall Flume Each =================================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 8559.81 11223.13 11223.13 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 8559.81 11223.13 11223.13 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 8559.81 11223.13 11223.13 =============== 615-52412 24x12 In Parshall Flume Each =================================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 2.00 8803.45 11223.13 11223.13 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 8803.45 11223.13 11223.13 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 8803.45 11223.13 11223.13 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 521 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 616-23240 24 In Plastic Siphon Pipe Lin Foot =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 688.00 185.20 205.65 205.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 688.00 185.20 205.65 205.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 688.00 185.20 205.65 205.65 =============== 616-30018 18 In Trash Guard Each =================================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 735.44 1228.97 1228.97 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 735.44 1228.97 1228.97 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 735.44 1228.97 1228.97 =============== 616-30024 24 In Trash Guard Each =================================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 5.00 835.44 1299.62 1299.62 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 835.44 1299.62 1299.62 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 835.44 1299.62 1299.62 =============== 616-30030 30 In Trash Guard Each =================================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 935.44 1369.13 1369.13 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 935.44 1369.13 1369.13 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 935.44 1369.13 1369.13 =============== 616-30036 36 In Trash Guard Each =================================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 3.00 1353.16 1722.21 1722.21 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 1353.16 1722.21 1722.21 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 1353.16 1722.21 1722.21 =============== 616-30060 60 In Trash Guard Each =================================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 1970.88 2968.85 2968.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1970.88 2968.85 2968.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1970.88 2968.85 2968.85 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 522 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 618-00142 Prestress Conc I (BT42) Lin Foot =============================================== IM0761-226 I76/SH52 Interchange 04/02/20 180.20 250.00 679.18 545.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 180.20 250.00 679.18 545.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 180.20 250.00 679.18 545.00 =============== 618-00154 Prestress Conc I (BT54) Lin Foot =============================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 3,592.00 300.00 363.76 359.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,592.00 300.00 363.76 359.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,592.00 300.00 363.76 359.25 =============== 618-01145 Prestress Conc I (CBT45) Lin Foot =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 4,280.00 296.77 318.65 318.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,280.00 296.77 318.65 318.65 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 2,152.00 363.13 363.13 363.13 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,152.00 363.13 363.13 363.13 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,432.00 318.97 333.53 333.53 =============== 618-01154 Prestress Conc I (CBT54) Lin Foot =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 2,894.00 292.97 317.23 317.23 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,894.00 292.97 317.23 317.23 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,894.00 292.97 317.23 317.23 =============== 618-01163 Prestress Conc I (CBT63) Lin Foot =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1,932.00 338.30 354.88 354.88 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,932.00 338.30 354.88 354.88 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,932.00 338.30 354.88 354.88 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 523 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 618-01992 Prestress Conc Box (Depth Less Than 32") Sq Foot ================================================ CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 3,990.00 75.00 84.88 75.90 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 4,028.00 80.00 81.80 64.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8,018.00 77.51 83.24 69.92 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 12,379.00 57.73 62.56 62.56 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12,379.00 57.73 62.56 62.56 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 11,686.00 54.33 58.81 58.81 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 11,686.00 54.33 58.81 58.81 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 32,083.00 61.44 77.37 63.03 =============== 618-06036 Prestress Conc Slab (Depth Gr Than 13") Sq Foot ================================================ BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 9,480.00 70.00 74.50 71.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9,480.00 70.00 74.50 71.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,480.00 70.00 74.50 71.00 =============== 619-00007 Connect To Existing Waterline Each =================================================== IM0761-226 I76/SH52 Interchange 04/02/20 9.00 4000.00 2308.13 1816.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 9.00 4000.00 2308.13 1816.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 4000.00 2308.13 1816.00 =============== 619-06060 6 In Duct Iron Pipe Lin Foot =============================================== IM0761-226 I76/SH52 Interchange 04/02/20 12.00 200.00 203.34 175.99 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12.00 200.00 203.34 175.99 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 200.00 203.34 175.99 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 524 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 619-06100 10 In Duct Iron Pipe Lin Foot =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 20.00 188.82 251.36 251.36 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20.00 188.82 251.36 251.36 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 188.82 251.36 251.36 =============== 619-06120 12 In Duct Iron Pipe Lin Foot =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 40.00 232.60 209.52 209.52 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 40.00 232.60 209.52 209.52 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 232.60 209.52 209.52 =============== 619-06240 24 In Duct Iron Pipe Lin Foot =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 434.00 396.93 401.46 401.46 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 434.00 396.93 401.46 401.46 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 434.00 396.93 401.46 401.46 =============== 619-10300 30 In Weld Steel Pipe Lin Foot =============================================== NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 60.00 500.00 541.79 541.79 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 60.00 500.00 541.79 541.79 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 60.00 500.00 541.79 541.79 =============== 619-30320 4 In Galv Pipe Lin Foot =============================================== STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 21.00 200.00 372.50 355.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 21.00 200.00 372.50 355.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 315.00 20.00 95.00 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 315.00 20.00 95.00 60.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 336.00 31.25 112.34 78.44 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 525 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 619-30480 6 In Galv Pipe Lin Foot =============================================== STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 27.00 250.00 425.50 391.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 27.00 250.00 425.50 391.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 27.00 250.00 425.50 391.00 =============== 619-50480 6 In Plastic Pipe Lin Foot =============================================== IM0761-226 I76/SH52 Interchange 04/02/20 55.00 250.00 153.56 86.49 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 55.00 250.00 153.56 86.49 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 55.00 250.00 153.56 86.49 =============== 619-50640 8 In Plastic Pipe Lin Foot =============================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 540.00 80.00 132.25 124.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 540.00 80.00 132.25 124.00 IM0761-226 I76/SH52 Interchange 04/02/20 77.00 275.00 150.21 121.99 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 77.00 275.00 150.21 121.99 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 107.00 358.94 345.33 345.33 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 107.00 358.94 345.33 345.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 724.00 141.96 138.79 156.50 =============== 619-50800 10 In Plastic Pipe Lin Foot =============================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 52.00 85.00 161.18 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 52.00 85.00 161.18 125.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 526 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 619-50800 10 In Plastic Pipe Lin Foot =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 30.00 144.13 193.68 193.68 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 30.00 144.13 193.68 193.68 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 82.00 106.63 163.36 150.13 =============== 619-50801 10 In Plastic Pipe (Spec) Lin Foot =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 4734.96 4797.28 4797.28 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 4734.96 4797.28 4797.28 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 4734.96 4797.28 4797.28 =============== 619-50960 12 In Plastic Pipe Lin Foot =============================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 488.00 100.00 188.13 155.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 488.00 100.00 188.13 155.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 347.00 237.42 221.95 221.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 347.00 237.42 221.95 221.95 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 835.00 157.11 190.89 182.82 =============== 619-50962 12 In Plastic Pipe (Fusible) Lin Foot =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 589.00 128.67 115.16 115.16 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 589.00 128.67 115.16 115.16 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 589.00 128.67 115.16 115.16 =============== 619-51200 15 In Plastic Pipe Lin Foot =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 106.00 115.92 260.02 260.02 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 106.00 115.92 260.02 260.02 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 106.00 115.92 260.02 260.02 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 527 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 619-75048 6 In Gate Valve Each =================================================== IM0761-226 I76/SH52 Interchange 04/02/20 2.00 3000.00 2128.20 2750.01 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 3000.00 2128.20 2750.01 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 3000.00 2128.20 2750.01 =============== 619-75064 8 In Gate Valve Each =================================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 2.00 1959.26 2457.79 2457.79 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 1959.26 2457.79 2457.79 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1959.26 2457.79 2457.79 =============== 619-75096 12 In Gate Valve Each =================================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 4.00 3399.07 4188.05 4188.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 3399.07 4188.05 4188.05 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 3399.07 4188.05 4188.05 =============== 619-78048 6 In Fire Hydrant Each =================================================== IM0761-226 I76/SH52 Interchange 04/02/20 1.00 7000.00 5987.45 4923.77 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 7000.00 5987.45 4923.77 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 7000.00 5987.45 4923.77 =============== 620-00001 Field Office (CL 1) Each =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 1.00 15000.00 24000.00 24000.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 1.00 18000.00 23500.00 20500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 16500.00 23571.43 22250.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 1.00 20000.00 23500.00 25000.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 528 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 620-00001 Field Office (CL 1) Each =================================================== C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 1.00 15000.00 37268.33 20805.00 IM025A-048 Northbound I-25 bridge at Exi 05/28/20 1.00 23400.00 16548.67 20000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 19466.67 26056.38 21935.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 18280.00 24896.73 22061.00 =============== 620-00002 Field Office (CL 2) Each =================================================== STA0142-066 SH 14 New Raymer West 01/09/20 1.00 18000.00 19014.31 18053.24 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 1.00 22000.00 36166.67 40000.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STA006A-067 SH 6 Merino to Atwood 01/16/20 1.00 18000.00 31592.66 40000.00 STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 1.00 20000.00 17500.00 15000.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 1.00 20000.00 24606.07 21212.13 STR141A-044 SH 141 AND SH 145, FROM SLICK 01/30/20 1.00 30000.00 48641.58 68000.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 1.00 55000.00 35000.00 20000.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 1.00 25000.00 21985.40 16670.79 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 1.00 23000.00 27000.00 20000.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 1.00 25000.00 24327.82 22000.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 1.00 26000.00 17253.19 16000.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 1.00 25000.00 20432.94 26000.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 1.00 30000.00 30560.00 15000.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 1.00 30000.00 15575.00 13000.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 1.00 28000.00 19780.00 28500.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 1.00 27000.00 46250.63 32751.88 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 1.00 20000.00 23840.00 30000.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 1.00 40000.00 44000.00 44000.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 1.00 35000.00 20625.89 24675.30 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 1.00 30000.00 33644.78 13843.36 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 1.00 25000.00 8506.25 10000.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1.00 40000.00 77580.00 100000.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1.00 22000.00 92592.19 95000.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1.00 28000.00 23000.00 22600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 24.00 27583.33 36761.21 31346.11 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 1.00 30000.00 25555.93 32485.84 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 1.00 24000.00 23790.00 30000.00 IM0761-226 I76/SH52 Interchange 04/02/20 1.00 22500.00 59158.30 53000.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 1.00 35000.00 28400.00 25000.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 1.00 25000.00 25749.84 20200.00 SFTY2254-091 225 Ramp Improvements 04/09/20 1.00 25000.00 36250.00 49500.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 529 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 620-00002 Field Office (CL 2) Each =================================================== C1601-082 Hawkins Signal and Curb Ramps 04/30/20 1.00 16000.00 31666.67 18000.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 1.00 12000.00 38470.00 28910.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 1.00 20000.00 24206.25 16500.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 1.00 25000.00 22674.63 11000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 23450.00 31981.52 28459.58 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 1.00 25000.00 31762.00 33000.00 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 1.00 30000.00 18099.00 22828.92 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 1.00 29318.18 29326.95 40000.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 1.00 15000.00 38873.62 24368.08 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 1.00 35000.00 31403.63 52500.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 1.00 30000.00 47288.14 34150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 27386.36 32890.68 34474.50 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 1.00 30000.00 38416.67 30000.00 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 2.00 25000.00 25714.00 37320.00 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 1.00 40000.00 45137.33 28412.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 1.00 30000.00 29439.73 47560.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 1.00 30000.00 66151.00 15137.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 1.00 25000.00 29319.92 26000.00 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 1.00 25000.00 20400.45 16316.47 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 1.00 40000.00 64360.00 42550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9.00 30000.00 37782.40 31179.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 49.00 27159.55 35117.73 31109.49 =============== 620-00005 Field Office (Spec) Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 1.00 30000.00 141622.03 192900.00 PWQM240-172 El Paso County, north Colorad 01/23/20 1.00 15000.00 29654.00 47308.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 1.00 20000.00 32800.00 16000.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1.00 27000.00 44264.00 32350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 23000.00 57966.27 72139.50 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 50000.00 97943.93 71500.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 530 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 620-00005 Field Office (Spec) Each =================================================== FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 50000.00 97943.93 71500.00 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 1.00 20000.00 56813.33 54440.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 1.00 30000.00 44766.67 45000.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 1.00 20000.00 26372.00 6208.00 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 1.00 30000.00 40352.67 40500.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1.00 41243.01 41243.01 41243.01 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 28248.60 40894.93 37478.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 28324.30 60150.66 54744.90 =============== 620-00011 Field Lab (CL 1) Each =================================================== FSA2873-194 US 287 Longmont Intersection 02/13/20 1.00 17000.00 22966.67 18000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 17000.00 22966.67 18000.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 1.00 20000.00 23500.00 25000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 20000.00 23500.00 25000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 18500.00 23100.00 21500.00 =============== 620-00012 Field Lab (CL 2) Each =================================================== STA0142-066 SH 14 New Raymer West 01/09/20 1.00 13000.00 18008.25 15000.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 1.00 25000.00 61281.82 70700.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 1.00 22000.00 34308.33 29000.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STA006A-067 SH 6 Merino to Atwood 01/16/20 1.00 16000.00 18736.50 20000.00 STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 1.00 20000.00 14065.00 11380.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 1.00 15000.00 22555.96 19111.92 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 1.00 30000.00 22500.00 20000.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 1.00 30000.00 22768.32 13336.63 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 1.00 20000.00 20100.00 8500.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 531 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 620-00012 Field Lab (CL 2) Each =================================================== STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 1.00 23000.00 23000.00 20000.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 1.00 20000.00 21906.87 19000.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 1.00 18000.00 14597.84 15000.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 1.00 20000.00 17079.68 24000.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 1.00 10000.00 14325.00 12000.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 1.00 27000.00 24636.67 31950.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 1.00 25000.00 42383.93 31151.79 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 1.00 20000.00 21465.00 27000.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 1.00 20000.00 18502.90 22639.50 NHPP0502-082 US 50 MONTROSE RE CHIP SEAL 03/05/20 1.00 23000.00 19625.00 26000.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 1.00 28000.00 21363.22 15872.38 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1.00 40000.00 47356.67 45000.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1.00 25000.00 57563.04 85000.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1.00 26000.00 21815.50 22600.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1.00 20000.00 35032.00 28610.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 24.00 22333.33 29299.88 26368.84 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 1.00 20000.00 22371.20 27071.53 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 1.00 22000.00 20695.00 28000.00 IM0761-226 I76/SH52 Interchange 04/02/20 1.00 25000.00 40769.11 37100.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 1.00 25000.00 19500.00 800.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 1.00 28000.00 25049.80 18200.00 SFTY2254-091 225 Ramp Improvements 04/09/20 1.00 50000.00 29300.00 36600.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 175000.00 48434.84 60500.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 1.00 11000.00 34190.00 18070.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 1.00 18000.00 18683.13 10700.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 1.00 26000.00 22921.13 9800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 40000.00 29734.50 24684.15 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 1.00 20000.00 13150.95 18466.87 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 1.00 25278.20 23865.87 20000.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 1.00 17430.30 17430.30 17430.30 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 1.00 10000.00 24879.16 42450.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 1.00 30000.00 34925.62 9470.70 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 17000.00 20542.73 20542.73 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 19951.42 24191.72 21393.43 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 1.00 15000.00 48500.00 30000.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 532 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 620-00012 Field Lab (CL 2) Each =================================================== CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 2.00 21500.00 19284.00 37320.00 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 1.00 20000.00 41323.33 35970.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 1.00 26000.00 32113.33 40000.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 1.00 30000.00 28186.11 36700.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 1.00 25000.00 27209.93 24000.00 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 1.00 20000.00 16420.33 17481.93 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 1.00 25000.00 33158.56 38750.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 1.00 35000.00 45976.67 33900.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1.00 17000.00 9722.56 9722.56 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 11.00 23272.73 30339.43 31014.95 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 51.00 25719.77 28867.10 26455.27 =============== 620-00015 Field Lab (State Furn) Each =================================================== STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 1.00 3000.00 8415.76 4000.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 1.00 8800.00 4339.95 4000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 5900.00 6785.43 4000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 5900.00 6785.43 4000.00 =============== 620-00020 Sanitary Facility Each =================================================== STA0142-066 SH 14 New Raymer West 01/09/20 1.00 2000.00 5531.00 10000.00 FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 1.00 3500.00 1907.59 2500.00 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 1.00 1215.00 2076.67 1630.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 1.00 2000.00 2500.00 2500.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 1.00 2744.00 26570.24 28013.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 1.00 2500.00 3444.17 5000.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STA006A-067 SH 6 Merino to Atwood 01/16/20 1.00 2000.00 4050.16 2500.00 STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 1.00 5000.00 3940.00 4130.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 2.00 1000.00 5650.32 6300.63 PWQM240-172 El Paso County, north Colorad 01/23/20 2.00 2500.00 1552.50 2975.00 STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 2.00 2500.00 250.00 250.00 STR141A-044 SH 141 AND SH 145, FROM SLICK 01/30/20 1.00 5000.00 10339.89 3500.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 3.00 5000.00 2500.00 2000.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 1.00 3000.00 7492.39 5834.77 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 1.00 2000.00 4981.42 2000.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 1.00 2000.00 1720.00 1300.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 2.00 2000.00 7500.00 9000.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 1.00 7000.00 9094.67 6000.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 533 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 620-00020 Sanitary Facility Each =================================================== FSA2873-194 US 287 Longmont Intersection 02/13/20 1.00 2000.00 1972.33 1284.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 2.00 2500.00 5667.54 6000.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 1.00 3000.00 7373.18 7000.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 1.00 4000.00 10887.50 10000.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 2.00 1500.00 1950.00 900.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 2.00 2800.00 1890.00 2570.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 1.00 3000.00 8583.50 8750.50 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 2.00 5000.00 5495.00 5000.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 1.00 2500.00 3200.00 3200.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 1.00 5000.00 1758.98 1860.30 NHPP0502-082 US 50 MONTROSE RE CHIP SEAL 03/05/20 1.00 2000.00 3375.00 5000.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 2.00 2500.00 1844.01 2434.83 STRR300-249 Grand and Jackson Counties AD 03/05/20 1.00 2500.00 3350.00 3000.00 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 1.00 2500.00 1387.50 1000.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 2.00 3500.00 5941.67 2900.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 2.00 2500.00 7759.16 11000.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1.00 2000.00 1532.50 1525.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1.00 3000.00 3273.00 1925.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 49.00 2919.57 4920.16 4573.74 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 1.00 5000.00 5801.36 4629.23 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 1.00 3000.00 3515.00 2000.00 IM0761-226 I76/SH52 Interchange 04/02/20 2.00 1500.00 5516.98 5618.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 1.00 2000.00 2850.00 5000.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 1.00 5000.00 6034.94 6840.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 2.00 2500.00 2812.50 3125.00 SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 2.00 3000.00 3000.00 3000.00 SFTY2254-091 225 Ramp Improvements 04/09/20 2.00 3500.00 2180.00 2860.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 12000.00 8896.89 16500.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 1.00 600.00 2557.00 700.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 1.00 2000.00 3816.67 6000.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 1.00 2000.00 9611.67 7230.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 2.00 2000.00 1222.25 1500.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 2.00 2000.00 1366.67 800.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 1.00 3000.00 2708.48 2700.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 1.00 2000.00 3396.00 3000.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 2.00 5000.00 850.00 250.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1.00 4000.00 3852.00 3852.00 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 1.00 2500.00 3573.60 750.00 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 2.00 2500.00 2668.75 5000.00 NH050A-037 US 50A Pueblo Regional Pond SHER400-373 R4 Signal Head Backplate Inst 05/28/20 2.00 3000.00 4225.00 5950.00 IM025A-048 Northbound I-25 bridge at Exi 05/28/20 1.00 3100.00 1955.00 1500.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 534 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 620-00020 Sanitary Facility Each =================================================== FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 1.00 2000.00 2000.00 1500.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 1.00 3000.00 2326.00 1525.00 NHPPR100-251 SH 2/ Vasquez 06/25/20 2.00 2000.00 930.18 566.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 35.00 3005.71 3401.60 3472.50 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 2.00 2500.00 3505.50 4400.00 STMM086-083 ADA PUEBLO METRO 07/09/20 2.00 2000.00 4100.00 4000.00 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 1.00 2000.00 1466.22 800.00 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 2.00 2000.00 2443.31 813.76 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 2.00 2121.00 1153.33 160.00 MTCER300-255 MTCE R3 FY20/21 Signal Replac 07/09/20 2.00 1500.00 2012.50 750.00 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 2.00 3000.00 440.00 650.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 2.00 3000.00 570.00 700.00 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 1.00 3500.00 1000.00 1000.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 3.00 2000.00 1800.00 2100.00 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 1.00 1000.00 1439.00 1625.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 3.00 2000.00 1431.67 500.00 STR184B-006 CULVERTS SH 184 08/06/20 1.00 3000.00 440.00 440.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 2.00 6000.00 3307.14 800.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 1.00 2500.00 3166.67 3000.00 SHER400-379 Signal Head Backplate Install 08/20/20 2.00 4000.00 3766.50 1500.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 2.00 2324.80 2477.66 3000.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 2.00 749.00 749.00 749.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 3.00 2000.00 2310.81 654.06 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1.00 3000.00 6245.71 1000.00 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 2.00 1500.00 930.00 1000.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 1.00 5000.00 4268.27 10800.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 1.00 4000.00 3938.29 3683.00 SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 1.00 2500.00 2500.00 2000.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 1.00 3000.00 2976.67 1000.00 CR400-374 FY 20 Culvert Prioritization 09/17/20 1.00 2000.00 505.00 440.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 4.00 4069.50 2568.00 2568.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 48.00 2649.33 2462.16 1726.41 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 1.00 2500.00 4918.33 3500.00 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 3.00 2500.00 2496.00 1945.00 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 1.00 3000.00 9657.00 13171.00 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 1.00 5000.00 8506.67 13520.00 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 1.00 2650.00 5715.17 2000.00 NHPP0702-407 PR I-70 Glenwood Springs Griz 11/03/20 2.00 2500.00 1317.23 500.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 535 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 620-00020 Sanitary Facility Each =================================================== NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 1.00 3500.00 7490.00 2500.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 1.00 5000.00 5217.72 6340.00 C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 2.00 2500.00 1588.10 950.00 ITSITSB-002 ITS CV ROADSIDE UNITS 11/12/20 1.00 2000.00 5447.67 1711.00 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 1.00 2000.00 1037.50 2100.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 1.00 2000.00 1017.75 371.00 FSA1211-098 SH 121 & 1ST AVE 11/19/20 1.00 2500.00 359.67 195.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 1.00 2500.00 11142.00 1784.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 2.00 5000.00 7516.97 5000.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 2.00 2500.00 5074.80 1500.00 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 2.00 2000.00 1205.70 699.28 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 1.00 2500.00 5986.03 8500.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 2.00 2500.00 1782.50 2265.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 2.00 3500.00 9934.17 11350.00 STA141A-051 This will be a chipseal proje 12/17/20 1.00 4500.00 2557.60 1600.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 12.00 3418.38 3745.00 3745.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 42.00 3075.49 4507.61 3633.23 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 174.00 2899.98 3771.96 3338.97 =============== 621-00200 Haul Road LUMP SUM =============================================== NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 1.00 50000.00 40986.21 29917.28 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 50000.00 40986.21 29917.28 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 50000.00 40986.21 29917.28 =============== 621-00411 Str Temp Acc Rd (Loc 1) LUMP SUM =============================================== STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 1.00 35000.00 14750.00 24000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 35000.00 14750.00 24000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 35000.00 14750.00 24000.00 =============== 621-00425 Detour LUMP SUM =============================================== BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 1.00 535000.00 771911.37 684453.97 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 535000.00 771911.37 684453.97 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 536 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 621-00425 Detour LUMP SUM =============================================== BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 1.00 128000.00 363414.28 362218.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 128000.00 363414.28 362218.90 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 1.00 100000.00 193451.67 103700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 100000.00 193451.67 103700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 254333.33 451019.23 383457.62 =============== 621-00430 Detour Sq Yard ================================================ NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 690.00 40.00 69.08 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 690.00 40.00 69.08 30.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 690.00 40.00 69.08 30.00 =============== 621-00450 Detour Pvmt Sq Yard ================================================ BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 5,534.00 130.00 93.58 95.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1,346.00 60.00 68.00 70.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 9,530.00 40.00 47.23 35.50 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 730.00 65.00 72.10 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 17,140.00 71.69 61.66 57.19 IM0761-226 I76/SH52 Interchange 04/02/20 5,475.00 75.00 43.63 31.41 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 2,301.00 75.00 57.94 37.56 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 2,250.00 60.00 85.00 67.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 3,062.00 125.00 119.15 124.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1,414.00 33.00 29.82 29.82 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 14,502.00 79.13 71.80 57.30 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 537 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 621-00450 Detour Pvmt Sq Yard ================================================ SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1,200.00 85.00 63.93 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,200.00 85.00 63.93 50.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 3,781.00 63.72 63.72 63.72 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 47,286.00 42.45 43.37 43.37 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 51,067.00 44.03 44.88 44.88 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 83,909.00 56.33 62.03 49.61 =============== 621-00451 Detour Pavement Ton ==================================================== NHPPR100-251 SH 2/ Vasquez 06/25/20 190.00 190.00 286.70 283.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 190.00 190.00 286.70 283.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 190.00 190.00 286.70 283.40 =============== 622-00270 Bollard Each =================================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 8.00 1000.00 780.00 810.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 1000.00 780.00 810.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 2.00 1500.00 1255.00 1020.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 1500.00 1255.00 1020.00 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 18.00 800.00 503.20 375.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 18.00 800.00 503.20 375.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 28.00 907.14 596.15 545.36 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 538 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 622-00540 Wheel Stop Each =================================================== NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 48.00 114.00 194.02 194.02 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 48.00 114.00 194.02 194.02 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 48.00 114.00 194.02 194.02 =============== 623-00602 2 In Plastic Pipe (Irrig/Sleve) Lin Foot =============================================== NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 718.00 17.33 15.10 15.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 718.00 17.33 15.10 15.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 718.00 17.33 15.10 15.10 =============== 623-00604 4 Inch Plastic Pipe (Irrig/Sleve) Lin Foot =============================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 415.00 10.00 12.42 9.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 415.00 10.00 12.42 9.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 415.00 10.00 12.42 9.50 =============== 623-00606 6 In Plastic Pipe (Irrig/Sleeve) Lin Foot =============================================== NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 718.00 21.05 19.08 19.08 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 718.00 21.05 19.08 19.08 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 718.00 21.05 19.08 19.08 =============== 624-20012 12 In Drainage Pipe (CL 0) Lin Foot =============================================== FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 44.00 150.00 63.53 64.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 44.00 150.00 63.53 64.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 44.00 150.00 63.53 64.00 =============== 624-20013 12 In Drainage Pipe (CL 0) (CIP) Lin Foot =============================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 58.00 100.00 87.73 63.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 58.00 100.00 87.73 63.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 58.00 100.00 87.73 63.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 539 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 624-20018 18 In Drainage Pipe (CL 0) Lin Foot =============================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 2,114.00 75.00 72.36 48.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,114.00 75.00 72.36 48.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,114.00 75.00 72.36 48.00 =============== 624-20019 18 In Drainage Pipe (CL 0) (CIP) Lin Foot =============================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 108.00 100.00 100.67 54.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 108.00 100.00 100.67 54.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 395.00 130.00 77.05 67.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 395.00 130.00 77.05 67.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 503.00 123.56 79.89 64.84 =============== 624-20025 24 In Drainage Pipe (CL 0) (CIP) Lin Foot =============================================== NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 105.00 160.00 107.40 80.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 105.00 160.00 107.40 80.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 105.00 160.00 107.40 80.40 =============== 624-20031 30 In Drainage Pipe (CL 0) (CIP) Lin Foot =============================================== NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 665.00 170.00 121.12 98.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 665.00 170.00 121.12 98.70 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 665.00 170.00 121.12 98.70 =============== 624-20037 36 In Drainage Pipe (CL 0) (CIP) Lin Foot =============================================== NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 660.00 180.00 140.83 105.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 660.00 180.00 140.83 105.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 660.00 180.00 140.83 105.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 540 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 624-20049 48 In Drainage Pipe (CL 0) (CIP) Lin Foot =============================================== NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 710.00 240.00 196.00 142.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 710.00 240.00 196.00 142.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 710.00 240.00 196.00 142.00 =============== 624-20061 60 In Drainage Pipe (CL 0) (CIP) Lin Foot =============================================== NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 375.00 300.00 278.50 164.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 375.00 300.00 278.50 164.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 375.00 300.00 278.50 164.00 =============== 624-20300 Detour Drainage Pipe (CL 0) Lin Foot =============================================== BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 300.00 130.00 168.54 145.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 300.00 130.00 168.54 145.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 244.00 160.00 138.81 125.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 869.00 134.00 110.81 110.81 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,113.00 139.70 130.87 113.92 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 50.00 117.59 117.59 117.59 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 4,582.00 61.23 64.60 64.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,632.00 61.84 65.17 65.17 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,045.00 79.56 105.97 78.11 =============== 624-22012 12 In Drainage Pipe (CL 2) Lin Foot =============================================== BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 163.00 70.00 82.23 60.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 541 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 624-22012 12 In Drainage Pipe (CL 2) Lin Foot =============================================== FBR0343-043 US 34 D-28-P STRUCTURE REPLAC -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 163.00 70.00 82.23 60.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 163.00 70.00 82.23 60.00 =============== 624-23049 48 In Drainage Pipe (CL 3) (CIP) Lin Foot =============================================== STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 153.00 320.00 316.00 282.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 153.00 320.00 316.00 282.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 153.00 320.00 316.00 282.00 =============== 624-27060 60 In Drainage Pipe (CL 7) Lin Foot =============================================== CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 132.00 3500.00 3311.00 2250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 132.00 3500.00 3311.00 2250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 132.00 3500.00 3311.00 2250.00 =============== 624-29013 12 In Drainage Pipe (CL 9) (CIP) Lin Foot =============================================== NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 29.00 55.88 181.17 181.17 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 29.00 55.88 181.17 181.17 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 29.00 55.88 181.17 181.17 =============== 624-29016 15 In Drainage Pipe (CL 9) (CIP) Lin Foot =============================================== FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 137.00 120.00 180.00 182.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 137.00 120.00 180.00 182.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 86.00 88.45 125.26 125.26 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 86.00 88.45 125.26 125.26 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 223.00 107.83 170.53 160.12 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 542 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 624-29019 18 In Drainage Pipe (CL 9) (CIP) Lin Foot =============================================== FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 275.00 150.00 184.00 197.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 275.00 150.00 184.00 197.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1,671.00 130.36 127.31 127.31 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,671.00 130.36 127.31 127.31 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 4,633.00 70.70 89.68 89.68 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,633.00 70.70 89.68 89.68 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,579.00 89.17 109.42 103.72 =============== 624-29024 24 In Drainage Pipe (CL 9) Lin Foot =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 524.00 492.46 540.71 540.71 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 524.00 492.46 540.71 540.71 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 524.00 492.46 540.71 540.71 =============== 624-29025 24 In Drainage Pipe (CL 9) (CIP) Lin Foot =============================================== NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 328.00 160.00 147.01 147.01 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 328.00 160.00 147.01 147.01 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1,035.00 168.40 244.40 244.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,035.00 168.40 244.40 244.40 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 2,113.00 111.71 126.83 126.83 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,113.00 111.71 126.83 126.83 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,476.00 133.15 163.74 163.74 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 543 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 624-29031 30 In Drainage Pipe (CL 9) (CIP) Lin Foot =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 622.00 105.52 131.20 131.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 622.00 105.52 131.20 131.20 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1,625.00 126.01 128.77 128.77 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,625.00 126.01 128.77 128.77 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,247.00 120.34 129.44 129.44 =============== 624-29037 36 In Drainage Pipe (CL 9) (CIP) Lin Foot =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 97.00 150.75 277.45 277.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 97.00 150.75 277.45 277.45 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 652.00 189.89 213.27 213.27 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 652.00 189.89 213.27 213.27 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 749.00 184.82 221.58 221.58 =============== 624-29048 48 In Drainage Pipe (CL 9) Lin Foot =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 228.00 799.14 946.74 946.74 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 228.00 799.14 946.74 946.74 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 228.00 799.14 946.74 946.74 =============== 624-29049 48 In Drainage Pipe (CL 9) (CIP) Lin Foot =============================================== NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 819.00 231.00 227.94 227.94 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 819.00 231.00 227.94 227.94 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 544 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 624-29049 48 In Drainage Pipe (CL 9) (CIP) Lin Foot =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1,075.00 273.02 255.67 255.67 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,075.00 273.02 255.67 255.67 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 622.00 198.67 238.42 238.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 622.00 198.67 238.42 238.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,516.00 240.96 242.38 242.38 =============== 624-29060 60 In Drainage Pipe (CL 9) Lin Foot =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 224.00 879.55 1195.19 1195.19 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 224.00 879.55 1195.19 1195.19 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 346.00 2500.00 3077.80 2250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 346.00 2500.00 3077.80 2250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 570.00 1863.19 2861.98 1835.48 =============== 624-29061 60 In Drainage Pipe (CL 9) (CIP) Lin Foot =============================================== NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 439.00 350.92 343.90 343.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 439.00 350.92 343.90 343.90 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 439.00 350.92 343.90 343.90 =============== 624-30016 15 In Drainage Pipe (CL 10) (CIP) Lin Foot =============================================== IM0761-226 I76/SH52 Interchange 04/02/20 97.00 45.00 103.50 79.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 97.00 45.00 103.50 79.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 97.00 45.00 103.50 79.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 545 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 624-30019 18 In Drainage Pipe (CL 10) (CIP) Lin Foot =============================================== IM0761-226 I76/SH52 Interchange 04/02/20 1,262.00 50.00 100.38 82.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,262.00 50.00 100.38 82.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,262.00 50.00 100.38 82.50 =============== 624-30025 24 In Drainage Pipe (CL 10) (CIP) Lin Foot =============================================== IM0761-226 I76/SH52 Interchange 04/02/20 897.00 80.00 137.74 97.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 897.00 80.00 137.74 97.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 897.00 80.00 137.74 97.00 =============== 624-30031 30 In Drainage Pipe (CL 10) CIP) Lin Foot =============================================== IM0761-226 I76/SH52 Interchange 04/02/20 103.00 90.00 160.52 153.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 174.00 125.00 212.33 134.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 277.00 111.99 182.28 141.06 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 277.00 111.99 182.28 141.06 =============== 624-49019 18 In Equiv Drain Pipe E (CL 9) (CIP) Lin Foot =============================================== FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 155.00 200.00 232.00 261.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 155.00 200.00 232.00 261.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 31.00 88.67 142.29 142.29 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 31.00 88.67 142.29 142.29 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 186.00 181.45 226.39 241.22 =============== 624-49025 24 In Equiv Drain Pipe E (CL 9) (CIP) Lin Foot =============================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 253.00 156.78 166.60 166.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 253.00 156.78 166.60 166.60 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 546 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 624-49025 24 In Equiv Drain Pipe E (CL 9) (CIP) Lin Foot =============================================== NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 141.00 111.60 134.07 134.07 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 141.00 111.60 134.07 134.07 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 394.00 140.61 154.96 154.96 =============== 624-50031 30 In Equiv Drain Pipe E (CL 10) (CIP) Lin Foot =============================================== IM0761-226 I76/SH52 Interchange 04/02/20 461.00 250.00 151.06 99.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 461.00 250.00 151.06 99.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 461.00 250.00 151.06 99.00 =============== 624-50055 54 In Equiv Drain Pipe E (CL 10) (CIP) Lin Foot =============================================== IM0761-226 I76/SH52 Interchange 04/02/20 310.00 500.00 437.24 375.99 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 310.00 500.00 437.24 375.99 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 310.00 500.00 437.24 375.99 =============== 625-00000 Const Surveying LUMP SUM =============================================== STA0142-066 SH 14 New Raymer West 01/09/20 1.00 15000.00 13558.25 18000.00 FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 1.00 10000.00 18582.27 19191.80 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 1.00 6500.00 11718.33 11795.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 1.00 25000.00 44000.00 44000.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 1.00 75000.00 188803.33 104374.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 1.00 50000.00 78887.83 60000.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STA006A-067 SH 6 Merino to Atwood 01/16/20 1.00 25000.00 19100.52 20000.00 STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 1.00 15000.00 8000.00 6000.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 1.00 20000.00 14875.79 15751.58 PWQM240-172 El Paso County, north Colorad 01/23/20 1.00 60000.00 85500.00 105000.00 STR141A-044 SH 141 AND SH 145, FROM SLICK 01/30/20 1.00 33000.00 48499.68 17000.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 1.00 110000.00 67500.00 75000.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 1.00 30000.00 19570.90 8641.80 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 547 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 625-00000 Const Surveying LUMP SUM =============================================== ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 1.00 20000.00 25942.40 2500.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 1.00 10000.00 37274.93 36000.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 1.00 40000.00 36500.00 43000.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 1.00 25000.00 28563.33 19000.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 1.00 12000.00 35329.17 20475.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 1.00 48000.00 22993.36 25000.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 1.00 25000.00 19079.68 5000.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 1.00 10000.00 19500.00 14000.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 1.00 45000.00 43285.94 68350.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 1.00 100000.00 101668.68 105006.04 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 1.00 70000.00 14000.00 14000.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 1.00 30000.00 33516.08 31590.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 1.00 15000.00 23480.81 29920.86 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1.00 150000.00 179023.33 160000.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1.00 450000.00 424187.50 438000.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1.00 50000.00 48400.00 56000.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1.00 15000.00 26849.40 30047.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 30.00 52983.33 76477.99 53421.44 IM0761-226 I76/SH52 Interchange 04/02/20 1.00 200000.00 160600.00 84800.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 1.00 15000.00 20366.67 12000.00 SFTY2254-091 225 Ramp Improvements 04/09/20 1.00 100000.00 29000.00 25000.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 350000.00 389648.07 110000.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 1.00 65000.00 16064.67 12355.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 1.00 30000.00 84103.33 109000.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 1.00 25000.00 78720.00 109100.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 1.00 15000.00 28462.50 21600.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 1.00 19000.00 21764.67 29680.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 1.00 39000.00 39074.41 42000.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 1.00 10000.00 16878.00 25376.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 1.00 10000.00 12193.33 20000.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1.00 237600.00 245545.17 245545.17 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 1.00 22500.00 37892.50 35000.00 NH050A-037 US 50A Pueblo Regional Pond FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 1.00 9000.00 5616.67 5850.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 1.00 15000.00 9261.00 8990.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16.00 72631.25 85722.53 56018.51 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 1.00 10000.00 13542.75 7500.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 548 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 625-00000 Const Surveying LUMP SUM =============================================== NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 1.00 35000.00 15284.21 14705.24 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 1.00 30000.00 3500.00 2500.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 1.00 20000.00 5000.00 3000.00 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 1.00 50000.00 8600.00 8600.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 1.00 12000.00 22815.00 15630.00 MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 1.00 15000.00 21408.40 27500.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 1.00 10000.00 10556.00 10995.00 STR184B-006 CULVERTS SH 184 08/06/20 1.00 10000.00 3000.00 3000.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 1.00 20000.00 34718.51 40000.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 1.00 122000.00 45534.90 21000.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 1.00 36042.90 36042.90 36042.90 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1.00 45000.00 79100.00 98000.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 1.00 40000.00 77690.52 68300.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 1.00 90000.00 93840.71 75000.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 345924.87 639992.68 639992.68 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 16.00 55685.49 52680.77 66985.36 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 1.00 20000.00 39641.67 52000.00 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 1.00 65000.00 50220.00 82550.00 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 1.00 40000.00 55017.00 53051.00 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 1.00 50000.00 28700.00 23100.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 1.00 70000.00 27243.33 30000.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 1.00 5000.00 9299.00 8756.00 FSA1211-098 SH 121 & 1ST AVE 11/19/20 1.00 12500.00 3547.00 2375.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 1.00 20000.00 48678.50 18857.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 1.00 15000.00 28587.94 18000.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 1.00 20000.00 8073.60 7500.00 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 1.00 10000.00 18764.48 22114.65 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 1.00 50000.00 32607.74 10000.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 1.00 15000.00 41715.00 26430.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1.00 107845.50 107845.50 107845.50 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 1.00 200.00 221043.33 165500.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1.00 948920.65 1048101.17 1048101.17 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 16.00 90591.63 72137.71 104761.27 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 78.00 65282.49 72819.22 67267.76 =============== 625-00001 Const Surveying (Hour) Hour =================================================== NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 20.00 200.00 184.00 175.00 STRR300-249 Grand and Jackson Counties AD 03/05/20 40.00 200.00 163.33 145.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 549 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 625-00001 Const Surveying (Hour) Hour =================================================== NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 100.00 200.00 201.17 180.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 20.00 170.00 199.80 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 180.00 196.67 190.85 173.89 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 20.00 150.00 199.00 163.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 100.00 170.00 197.22 194.44 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 60.00 200.00 198.09 220.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 10.00 175.00 219.33 190.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 190.00 177.63 198.76 198.97 STMM086-083 ADA PUEBLO METRO 07/09/20 351.00 160.00 202.50 195.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 40.00 225.00 287.00 175.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 40.00 275.00 309.17 173.85 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 100.00 180.00 178.99 137.50 CR400-374 FY 20 Culvert Prioritization 09/17/20 12.00 300.00 356.75 170.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 543.00 180.04 230.67 180.83 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 100.00 200.00 188.00 209.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 10.00 180.00 189.67 150.00 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 30.00 250.00 419.25 212.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 80.00 183.75 183.75 183.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 220.00 200.00 239.81 197.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,133.00 186.15 217.75 186.01 =============== 625-00015 Settlement Instrument LUMP SUM =============================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1.00 20000.00 20750.00 13300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 20000.00 20750.00 13300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 20000.00 20750.00 13300.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 550 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 626-00000 Mobilization LUMP SUM =============================================== STA0142-066 SH 14 New Raymer West 01/09/20 1.00 325000.00 353386.75 452047.00 FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 1.00 120000.00 140633.33 102000.00 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 1.00 50000.00 69349.33 22750.00 SHER500-210 R5 FY19 CENTER LINE RUMBLE ST 01/09/20 1.00 100000.00 139000.00 153000.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 1.00 90000.00 250000.00 250000.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 1.00 1250000.00 1388914.56 1100000.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 1.00 525000.00 559089.67 514000.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STA006A-067 SH 6 Merino to Atwood 01/16/20 1.00 250000.00 325824.05 185000.00 STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 1.00 160000.00 173345.00 146690.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 1.00 489674.00 581197.54 558395.07 PWQM240-172 El Paso County, north Colorad 01/23/20 1.00 438611.00 73212.50 62425.00 STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 1.00 60888.75 140000.00 140000.00 STR141A-044 SH 141 AND SH 145, FROM SLICK 01/30/20 1.00 800000.00 1074186.88 512000.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 1.00 600000.00 735000.00 770000.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 1.00 350000.00 386500.00 383000.00 MTCER300-257 R3 FY 20/21 Region Wide Epoxy 02/06/20 1.00 13000.00 55000.00 35000.00 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 1.00 275000.00 327570.36 215100.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 1.00 20000.00 334200.00 330000.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 1.00 600000.00 815486.00 703972.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 1.00 604993.60 678122.00 512675.00 MTCER500-213 R5 FY 20 / FY 21 STRIPING 02/13/20 1.00 15000.00 33475.00 45000.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 1.00 100000.00 136585.83 122515.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 1.00 245743.50 402383.10 281766.20 STR0101-027 SH 10 Overlay La Junta West 02/27/20 1.00 360960.70 466021.55 501699.40 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 1.00 400000.00 330984.71 288006.84 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 1.00 110000.00 214172.50 153000.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 1.00 258258.10 384244.60 275000.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 1.00 1400000.00 1316558.84 1243676.51 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 1.00 700000.00 510610.00 435000.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 1.00 470000.00 480000.00 480000.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 1.00 449105.00 448588.91 432152.07 NHPP0502-082 US 50 MONTROSE RE CHIP SEAL 03/05/20 1.00 300000.00 439000.00 340000.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 1.00 219705.07 217989.92 128573.44 STRR300-249 Grand and Jackson Counties AD 03/05/20 1.00 120000.00 420472.00 212551.00 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 1.00 45000.00 79612.25 40449.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1.00 1200000.00 1454000.00 1412000.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1.00 2700156.75 3281670.78 3300000.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1.00 180000.00 142397.88 124800.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1.00 250000.00 242650.20 238000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 39.00 426822.99 612980.83 441083.17 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 1.00 750000.00 668533.16 613000.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 551 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 626-00000 Mobilization LUMP SUM =============================================== STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 1.00 500000.00 537150.00 578000.00 IM0761-226 I76/SH52 Interchange 04/02/20 1.00 1000000.00 1249364.84 1144453.90 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 1.00 100000.00 152086.67 129260.00 MTCER300-259 MTCE R3 FY20/21 Region Wide S 04/02/20 1.00 20000.00 41250.00 32500.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 1.00 870000.00 740550.57 582780.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 1.00 166068.00 205939.45 161878.90 SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 1.00 175000.00 325000.00 325000.00 NHPP1601-077 US 160 MP 29.750 - MP 34.891 04/09/20 1.00 150000.00 237000.00 190000.00 SFTY2254-091 225 Ramp Improvements 04/09/20 1.00 350000.00 311900.00 233800.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 2500000.00 2215831.68 2126375.35 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 1.00 100000.00 110738.33 107215.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 1.00 140000.00 296666.67 200000.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 1.00 250000.00 620266.67 637300.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 1.00 170000.00 176406.53 132000.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 1.00 130000.00 119066.67 120000.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 1.00 300000.00 244160.74 198000.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 1.00 500000.00 278649.75 160538.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 1.00 71500.00 168333.33 150000.00 MTCE R100-341 Various Highways in Region 1 05/21/20 1.00 25000.00 87500.00 50000.00 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 1.00 400000.00 182546.60 66150.00 MTCER200-265 Pueblo 05/28/20 1.00 35015.05 99750.00 125000.00 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 1.00 130459.00 203862.75 195000.00 NH050A-037 US 50A Pueblo Regional Pond SHER400-373 R4 Signal Head Backplate Inst 05/28/20 1.00 170000.00 137500.00 83000.00 IM025A-048 Northbound I-25 bridge at Exi 05/28/20 1.00 74549.00 66457.33 39000.00 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 1.00 360000.00 150000.00 125000.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 1.00 55000.00 57031.67 38825.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 1.00 90290.80 118376.60 83427.00 NHPPR100-251 SH 2/ Vasquez 06/25/20 1.00 75000.00 129000.00 167000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 29.00 333030.41 446846.29 303258.73 MTCER400-381 REGION 4 FY21 EPOXY 07/02/20 1.00 42500.00 97200.00 25000.00 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 1.00 200000.00 202816.00 190000.00 STMM086-083 ADA PUEBLO METRO 07/09/20 1.00 213211.00 361277.50 377555.00 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 1.00 100000.00 109135.50 113145.00 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 1.00 83064.00 74998.94 31628.66 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 1.00 65655.50 62000.00 95000.00 MTCER300-258 MTCE R3 FY20 Region Roundabou 07/09/20 1.00 35000.00 48333.33 35000.00 MTCER300-255 MTCE R3 FY20/21 Signal Replac 07/09/20 1.00 90000.00 141648.75 200000.00 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 1.00 74482.00 70000.00 32000.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 1.00 50969.00 80000.00 50000.00 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 1.00 50000.00 50000.00 50000.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 1.00 100000.00 305000.00 210000.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 552 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 626-00000 Mobilization LUMP SUM =============================================== MTCE R100-334 ZANG STREET AND COAL CREEK YA 08/06/20 1.00 93000.00 79210.00 50500.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 1.00 80000.00 86103.33 78500.00 STR184B-006 CULVERTS SH 184 08/06/20 1.00 49000.00 49000.00 49000.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 1.00 433293.25 466857.25 220000.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 1.00 125000.00 165037.00 153111.00 SHER400-379 Signal Head Backplate Install 08/20/20 1.00 96000.00 97500.00 135000.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 1.00 216588.19 324977.56 220000.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 1.00 529182.62 529182.62 529182.62 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 1.00 300000.00 248204.83 110000.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 1.00 140000.00 226459.77 142298.84 MTCE0702-386 Grand Junction 09/03/20 1.00 70000.00 96966.67 51000.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1.00 350000.00 349757.04 300000.00 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 1.00 85000.00 129737.40 79000.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 1.00 656234.00 867200.08 307900.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 1.00 880000.00 788385.83 800000.00 SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 1.00 350000.00 257500.00 40000.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 1.00 48184.00 68335.00 60000.00 CR400-374 FY 20 Culvert Prioritization 09/17/20 1.00 50000.00 29833.25 23000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 30.00 188545.45 257147.02 158594.04 MPC040-061 R2 FY 21 Sign Replacement 10/01/20 1.00 149751.83 127500.00 150000.00 MTCE0253-271 FY20 I-25 SIGN REPL PHASE 1 10/08/20 1.00 60000.00 48039.40 43000.00 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 1.00 125000.00 365540.00 183000.00 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 1.00 146000.00 161511.20 116080.00 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 1.00 900000.00 465508.00 346844.00 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 1.00 1250000.00 1731719.47 1171700.00 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 1.00 425000.00 383101.83 175000.00 NHPP0702-407 PR I-70 Glenwood Springs Griz 11/03/20 1.00 250000.00 132647.34 56000.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 1.00 700000.00 833000.00 600000.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 1.00 600000.00 890858.87 575000.00 C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 1.00 160000.00 195960.95 158000.00 ITSITSB-002 ITS CV ROADSIDE UNITS 11/12/20 1.00 530000.00 461288.67 91189.00 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 1.00 60000.00 71050.00 52300.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 1.00 40000.00 69660.25 42206.00 FSA1211-098 SH 121 & 1ST AVE 11/19/20 1.00 50000.00 38620.67 8805.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 1.00 680000.00 417000.00 215000.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 1.00 630000.00 702003.02 735680.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 1.00 250000.00 265475.80 174100.00 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 1.00 147124.95 152347.91 55383.92 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 1.00 300000.00 364327.99 340000.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 1.00 165000.00 207950.00 130000.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 1.00 1700000.00 1966466.67 1123800.00 CR100-342 US-6 at Garrison 12/17/20 1.00 120000.00 146717.08 181052.50 STA141A-051 This will be a chipseal proje 12/17/20 1.00 300000.00 365600.00 333000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 24.00 405744.87 466110.05 294047.52 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 122.00 341788.68 447108.83 309932.03 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 553 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 626-00100 Mobilization (w/o Autopay) LUMP SUM =============================================== NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 1.00 20000.00 4084.16 6168.32 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 20000.00 4084.16 6168.32 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1.00 1000800.00 946683.59 946683.59 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 1000800.00 946683.59 946683.59 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 3074729.90 3861068.77 3861068.77 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 3074729.90 3861068.77 3861068.77 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1.00 1312796.18 1312796.18 1312796.18 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1.00 7630867.45 8812982.24 8812982.24 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 5524843.69 6312920.22 6312920.22 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 3093198.86 3173603.74 3570054.21 =============== 626-00307 Mobilization Each =================================================== IM0252-498 I-25 Maintenance Region 2 Pue 08/19/20 24.00 887.86 887.86 887.86 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 24.00 887.86 887.86 887.86 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 24.00 887.86 887.86 887.86 =============== 626-01101 Public Info Services (Tier I) GAP ONLY LUMP SUM =============================================== FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1.00 40353.60 40353.60 40353.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 40353.60 40353.60 40353.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 40353.60 40353.60 40353.60 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 554 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 626-01111 Public Info Manage (Tier I) Day ==================================================== NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 90.00 188.00 156.04 156.04 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 90.00 188.00 156.04 156.04 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 9700.00 10378.80 10378.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 9700.00 10378.80 10378.80 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 726.00 85.00 90.95 90.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 726.00 85.00 90.95 90.95 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 817.00 108.12 110.71 110.71 =============== 626-01112 Public Info Manage (Tier II) Day ==================================================== NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 140.00 90.00 143.52 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 140.00 90.00 143.52 200.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 395.00 75.00 94.33 96.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 395.00 75.00 94.33 96.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 535.00 78.93 101.73 123.44 =============== 626-01113 Public Info Manage (Tier III) Day ==================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 180.00 27.00 47.50 55.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 125.00 72.00 125.00 125.00 STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 100.00 65.00 55.00 60.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 120.00 80.00 124.76 94.51 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 80.00 125.00 102.50 125.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 555 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 626-01113 Public Info Manage (Tier III) Day ==================================================== STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 70.00 500.00 179.45 173.89 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 428.00 80.00 92.70 45.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 70.00 200.00 76.25 52.50 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 166.00 80.00 50.00 50.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 195.00 80.00 71.45 45.51 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 433.00 69.00 86.67 70.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 150.00 120.00 59.50 34.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 115.00 160.00 144.20 155.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,232.00 97.83 87.06 70.96 IM0761-226 I76/SH52 Interchange 04/02/20 275.00 100.00 75.68 70.33 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 225.00 153.00 64.49 63.20 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 148.00 80.00 61.10 72.19 SFTY2254-091 225 Ramp Improvements 04/09/20 67.00 225.00 78.00 64.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 410.00 330.00 69.83 66.55 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 120.00 85.00 100.33 106.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 215.00 50.00 103.00 74.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 60.00 70.00 88.67 125.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 95.00 25.00 91.10 96.50 NHPPR100-251 SH 2/ Vasquez 06/25/20 10.00 135.00 858.73 916.46 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,625.00 155.70 77.94 80.17 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 85.00 175.00 205.50 220.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 224.00 65.00 56.71 45.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 180.00 166.57 166.57 166.57 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 180.00 50.00 109.13 91.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 120.00 70.00 145.07 105.36 MTCE0702-386 Grand Junction 09/03/20 55.00 125.00 153.33 100.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 140.00 150.00 99.57 60.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 300.00 45.00 42.59 56.65 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 175.00 90.00 70.70 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,459.00 91.80 85.32 90.34 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 180.00 50.00 60.40 50.20 NHPP0702-407 PR I-70 Glenwood Springs Griz 11/03/20 125.00 300.00 118.79 150.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 556 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 626-01113 Public Info Manage (Tier III) Day ==================================================== NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 170.00 75.00 60.57 55.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 214.00 80.00 78.04 67.80 C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 212.00 300.00 88.12 110.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 145.00 207.00 103.00 106.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 172.00 80.00 76.45 70.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 270.00 110.00 53.60 41.00 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 90.00 80.00 75.89 90.03 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 135.00 200.00 91.62 120.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 460.00 70.00 44.02 64.60 CR100-342 US-6 at Garrison 12/17/20 120.00 75.00 109.17 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,293.00 125.97 69.23 79.31 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,609.00 117.51 79.02 79.16 =============== 626-01114 Public Info Manage (Tier IV) Day ==================================================== STA0142-066 SH 14 New Raymer West 01/09/20 51.00 100.00 69.75 53.00 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 40.00 120.00 94.00 96.00 SHER500-210 R5 FY19 CENTER LINE RUMBLE ST 01/09/20 60.00 100.00 100.50 1.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 185.00 45.00 93.10 69.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STA006A-067 SH 6 Merino to Atwood 01/16/20 50.00 125.00 107.01 74.00 PWQM240-172 El Paso County, north Colorad 01/23/20 300.00 33.50 25.50 22.00 STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 90.00 70.00 50.00 50.00 STR141A-044 SH 141 AND SH 145, FROM SLICK 01/30/20 270.00 80.00 46.20 29.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 100.00 50.00 59.40 70.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 257.00 50.00 37.00 34.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 169.00 75.00 51.58 41.00 MTCER500-213 R5 FY 20 / FY 21 STRIPING 02/13/20 90.00 70.00 100.38 66.50 FSA2873-194 US 287 Longmont Intersection 02/13/20 90.00 100.00 94.33 160.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 165.00 75.00 77.00 50.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 156.00 75.00 44.43 35.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 370.00 67.00 60.00 60.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 131.00 80.00 49.00 49.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 198.00 75.00 65.68 72.54 NHPP0502-082 US 50 MONTROSE RE CHIP SEAL 03/05/20 120.00 60.00 77.26 35.00 STRR300-249 Grand and Jackson Counties AD 03/05/20 75.00 80.00 106.67 60.00 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 25.00 100.00 192.75 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,992.00 68.23 66.42 51.45 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 98.00 90.00 75.07 74.72 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 557 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 626-01114 Public Info Manage (Tier IV) Day ==================================================== STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 68.00 200.00 101.00 100.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 50.00 200.00 123.50 116.00 SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 240.00 50.00 100.00 100.00 NHPP1601-077 US 160 MP 29.750 - MP 34.891 04/09/20 83.00 72.00 54.33 40.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 1.00 4000.00 3856.00 86.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 47.00 150.00 86.75 65.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 200.00 25.00 61.00 71.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 95.00 65.00 72.07 64.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 20.00 200.00 216.75 121.01 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 10.00 100.00 443.18 200.00 MTCER200-265 Pueblo 05/28/20 120.00 52.00 104.50 125.00 SHER400-373 R4 Signal Head Backplate Inst 05/28/20 90.00 95.00 82.00 95.00 IM025A-048 Northbound I-25 bridge at Exi 05/28/20 82.00 100.00 68.47 50.00 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 10.00 50.00 77.50 55.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 55.00 135.00 82.33 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,269.00 85.53 89.88 84.86 STMM086-083 ADA PUEBLO METRO 07/09/20 314.00 200.00 90.00 85.00 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 10.00 750.00 253.30 318.00 NH0504-908 US50B PUEBLO (MP 318) STR K-1 07/09/20 120.00 70.00 68.81 45.95 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 90.00 70.00 75.83 50.00 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 67.00 75.00 71.75 75.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 88.00 70.00 52.50 55.00 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 40.00 100.00 85.00 85.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 160.00 50.00 73.00 75.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 140.00 125.00 73.67 80.00 STR184B-006 CULVERTS SH 184 08/06/20 68.00 80.00 50.00 50.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 152.00 120.00 66.67 25.00 SHER400-379 Signal Head Backplate Install 08/20/20 50.00 95.00 80.50 66.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 322.00 110.00 43.54 35.00 SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 260.00 75.00 92.50 125.00 CR400-374 FY 20 Culvert Prioritization 09/17/20 9.00 700.00 412.00 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,890.00 113.93 66.71 69.30 MPC040-061 R2 FY 21 Sign Replacement 10/01/20 180.00 50.00 82.50 55.00 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 287.00 90.00 61.00 40.00 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 158.00 40.00 59.90 56.50 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 290.00 65.00 62.28 26.83 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 90.00 175.00 85.25 50.00 ITSITSB-002 ITS CV ROADSIDE UNITS 11/12/20 90.00 400.00 110.67 82.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 558 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 626-01114 Public Info Manage (Tier IV) Day ==================================================== NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 74.00 80.00 61.00 47.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 105.00 80.00 81.38 60.00 FSA1211-098 SH 121 & 1ST AVE 11/19/20 47.00 125.00 59.50 62.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 146.00 75.00 77.50 72.00 STA141A-051 This will be a chipseal proje 12/17/20 104.00 60.00 125.48 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,571.00 94.93 76.15 50.22 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,722.00 87.69 72.36 61.06 =============== 627-00001 Pvmt Mkg Paint Gallon ================================================= NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 2,054.00 40.00 50.92 48.83 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 5,692.00 40.00 32.27 40.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 2,808.00 40.00 53.53 51.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 113.00 100.00 70.94 63.71 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10,667.00 40.64 41.68 44.85 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 500.00 70.00 63.88 54.36 CR100-342 US-6 at Garrison 12/17/20 20.00 85.00 572.50 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 520.00 70.58 101.56 54.19 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,187.00 42.03 44.71 45.28 =============== 627-00003 Thermoplastic Pvmt Mkg (Inlaid) Sq Foot ================================================ SHE 0703-461 I-70 and Kipling North Phase 03/26/20 875.00 9.80 17.70 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 875.00 9.80 17.70 22.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 875.00 9.80 17.70 22.00 =============== 627-00004 Epoxy Pvmt Mkg Sq Foot ================================================ STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 14.00 15.00 460.00 170.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 14.00 15.00 460.00 170.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 15.00 460.00 170.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 559 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-00005 Epoxy Pvmt Mkg Gallon ================================================= STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 2.00 120.00 2625.00 3450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 120.00 2625.00 3450.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 120.00 2625.00 3450.00 =============== 627-00006 Mod Epoxy Pvmt Mkg (On-Call) Gallon ================================================= MTCER300-257 R3 FY 20/21 Region Wide Epoxy 02/06/20 1,100.00 66.00 82.75 80.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,100.00 66.00 82.75 80.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,100.00 66.00 82.75 80.50 =============== 627-00008 Mod Epoxy Pvmt Mkg Gallon ================================================= STA0142-066 SH 14 New Raymer West 01/09/20 696.00 125.00 81.00 75.00 FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 104.00 100.00 147.74 132.00 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 33.00 100.00 208.33 270.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 24.00 200.00 320.00 320.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 1,576.00 82.00 79.18 85.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 21.00 300.00 440.72 500.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STA006A-067 SH 6 Merino to Atwood 01/16/20 528.00 100.00 100.29 102.00 STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 364.00 90.00 90.75 86.50 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 1,363.00 125.00 96.42 90.83 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 754.00 100.00 85.00 100.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 285.00 100.00 132.96 162.29 MTCER300-257 R3 FY 20/21 Region Wide Epoxy 02/06/20 39,082.00 61.00 74.45 73.90 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 2,035.00 75.00 98.50 87.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 1,112.00 62.00 136.25 130.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 18.00 150.00 487.50 500.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 677.00 66.00 93.51 110.00 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 1,626.00 90.00 67.50 70.00 NHPP0502-082 US 50 MONTROSE RE CHIP SEAL 03/05/20 4,461.00 70.00 95.13 95.50 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 25.00 80.00 275.47 178.62 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 88.00 150.00 313.33 320.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 17.00 70.00 463.25 476.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 20.00 100.00 316.40 360.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 54,909.00 67.95 82.98 80.84 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 1,461.00 100.00 95.75 91.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 560 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-00008 Mod Epoxy Pvmt Mkg Gallon ================================================= IM0761-226 I76/SH52 Interchange 04/02/20 173.00 120.00 126.81 100.70 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 52.00 100.00 237.50 225.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 1,422.00 90.00 105.50 92.00 SFTY2254-091 225 Ramp Improvements 04/09/20 91.00 90.00 227.50 298.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 883.00 80.00 90.49 88.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 30.00 64.00 206.35 342.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 81.00 100.00 118.13 117.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 1.00 500.00 618.33 620.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 29.00 450.00 311.22 300.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 1,196.00 85.00 84.93 79.00 MTCE R100-341 Various Highways in Region 1 05/21/20 65,653.00 54.00 66.08 68.15 MTCER200-265 Pueblo 05/28/20 36,732.00 63.00 70.63 69.50 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 102.00 160.00 355.81 375.57 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 107,906.00 59.12 71.43 70.32 MTCER400-381 REGION 4 FY21 EPOXY 07/02/20 39,997.00 65.00 66.95 55.00 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 8.00 350.00 811.38 630.00 MTCER300-258 MTCE R3 FY20 Region Roundabou 07/09/20 220.00 350.00 350.00 375.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 28.00 300.00 378.00 552.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 31.00 200.00 992.29 770.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 94.00 136.48 136.48 136.48 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 10.00 125.00 956.61 158.04 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 60.00 76.00 251.57 230.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 23.00 325.00 354.84 354.84 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 40,471.00 67.22 69.75 58.39 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 1,636.00 100.00 103.13 94.40 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 824.00 90.00 86.50 80.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 325.00 110.00 129.15 135.60 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 22.00 275.00 293.50 282.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 1,647.00 85.00 75.95 80.00 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 303.00 65.00 115.94 116.13 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 387.00 150.00 100.91 100.94 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 63.00 200.00 342.50 345.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 40.00 219.64 219.64 219.64 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 438.00 120.00 101.40 164.00 STA141A-051 This will be a chipseal proje 12/17/20 6,168.00 90.00 91.36 70.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1,743.00 85.68 101.99 101.99 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 13,596.00 93.83 92.83 87.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 216,882.00 65.04 74.72 71.83 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 561 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-00009 Mod Epoxy (Inlaid) Gallon ================================================= NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 8.00 150.00 587.00 500.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 324.00 150.00 183.22 171.19 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 384.00 180.00 193.57 210.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 716.00 166.09 195.97 195.68 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 45.00 150.00 247.88 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 45.00 150.00 247.88 250.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 398.00 150.00 106.24 112.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 398.00 150.00 106.24 112.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 40.00 326.78 326.78 326.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 40.00 326.78 326.78 326.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,199.00 165.51 166.90 174.31 =============== 627-00011 Pvmt Mkg Paint (Waterborne) Gallon ================================================= STA0142-066 SH 14 New Raymer West 01/09/20 1,331.00 50.00 52.00 36.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 90.00 80.00 78.22 68.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STA006A-067 SH 6 Merino to Atwood 01/16/20 980.00 50.00 54.88 56.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 20.00 90.00 197.76 132.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,421.00 51.45 55.98 46.08 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 67.00 75.00 102.05 90.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 2.00 200.00 169.24 169.24 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 69.00 78.62 102.27 92.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,490.00 52.20 59.27 47.36 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 562 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-00013 Pvmt Mkg Paint (High Build) Gallon ================================================= SHER500-210 R5 FY19 CENTER LINE RUMBLE ST 01/09/20 6,812.00 50.00 35.00 32.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 850.00 50.00 58.57 104.00 STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 433.00 40.00 63.75 55.50 STR141A-044 SH 141 AND SH 145, FROM SLICK 01/30/20 11,533.00 46.43 33.07 30.92 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 2,111.00 37.00 45.00 50.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 2,222.00 47.00 48.00 41.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 2,973.00 45.00 32.43 38.00 MTCER500-213 R5 FY 20 / FY 21 STRIPING 02/13/20 72,200.00 24.00 30.03 27.25 FSA2873-194 US 287 Longmont Intersection 02/13/20 57.00 60.00 112.58 89.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 2,107.00 30.00 42.98 49.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 2,429.00 45.00 39.41 42.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 1,598.00 28.00 58.47 62.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 9,820.00 45.00 38.82 31.47 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 1,245.00 40.00 47.00 60.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 4,881.00 27171.00 34.67 34.67 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 355.00 100.00 103.80 142.74 NHPP0502-082 US 50 MONTROSE RE CHIP SEAL 03/05/20 8,077.00 30.00 39.25 33.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 241.00 50.00 91.92 91.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 560.00 26.00 63.44 54.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 225.00 45.00 59.40 61.60 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 8.00 40.00 309.00 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 130,737.00 1045.11 33.60 32.21 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 2,710.00 35.00 47.96 49.81 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 4,128.00 40.00 36.35 35.00 IM0761-226 I76/SH52 Interchange 04/02/20 224.00 60.00 65.61 63.60 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 201.00 40.00 63.33 60.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 2,290.00 50.00 39.75 28.00 NHPP1601-077 US 160 MP 29.750 - MP 34.891 04/09/20 1,367.00 30.00 46.63 32.25 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1,484.00 38.00 49.36 44.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1601-082 Hawkins Signal and Curb Ramps 04/30/20 18.00 50.00 192.33 150.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 43.00 150.00 1034.00 91.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 216.00 50.00 65.25 62.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 622.00 35.00 45.08 46.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 13,303.00 40.09 48.73 39.68 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 22.00 120.00 200.00 200.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 563 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-00013 Pvmt Mkg Paint (High Build) Gallon ================================================= SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 9.00 100.00 345.00 525.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 106.00 85.78 117.32 120.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 113.00 70.97 70.97 70.97 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 10.00 400.00 588.84 131.70 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 1,200.00 90.00 49.14 52.80 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 461.00 34.70 25.80 24.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,921.00 77.38 50.93 55.17 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 3,393.00 50.00 40.03 30.10 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 1,040.00 55.00 78.70 75.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 329.00 60.00 62.54 75.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 24.00 50.00 177.50 160.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 2,798.00 35.00 35.15 35.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 60.00 36.00 130.00 104.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 11.00 100.00 192.50 205.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 140.00 80.36 80.36 80.36 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 2,600.00 55.00 41.22 52.40 STA141A-051 This will be a chipseal proje 12/17/20 9,303.00 35.00 43.84 32.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 5,150.00 44.51 54.42 54.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 24,848.00 42.58 44.06 41.88 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 170,809.00 810.11 36.66 34.46 =============== 627-00014 Pvmt Mkg Paint (Low Temp) Gallon ================================================= STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 1,194.00 65.00 48.93 55.18 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,194.00 65.00 48.93 55.18 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 21.00 70.00 456.25 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 21.00 70.00 456.25 350.00 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 1,122.00 80.00 50.63 44.62 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,122.00 80.00 50.63 44.62 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,337.00 72.25 55.77 52.76 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 564 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-00019 Pvmt Mkg Paint (High Build)(Inlaid) Gallon ================================================= NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 1,485.00 80.00 126.58 124.53 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,485.00 80.00 126.58 124.53 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,485.00 80.00 126.58 124.53 =============== 627-00025 4 In Pvmt Mkg Tape (Rem) Lin Foot =============================================== NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 9,600.00 5.00 3.75 6.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 1,790.00 1.00 6.00 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11,390.00 4.37 4.47 5.84 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,390.00 4.37 4.47 5.84 =============== 627-00070 Preform Thermoplastic Pvmt Mkg Sq Foot ================================================ NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 7,912.00 15.00 16.10 17.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7,912.00 15.00 16.10 17.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,912.00 15.00 16.10 17.00 =============== 627-00090 Pvmt Mkg (Spec) Sq Foot ================================================ NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1,000.00 7.00 12.20 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,000.00 7.00 12.20 11.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,000.00 7.00 12.20 11.00 =============== 627-01001 Preform Plastic Pvmt Mkg (Ty I) Sq Foot ================================================ FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 155.00 17.68 17.68 17.68 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 155.00 17.68 17.68 17.68 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 155.00 17.68 17.68 17.68 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 565 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-01010 Preform Plastic Pvmt Mkg (TY I)(Inlaid) Sq Foot ================================================ FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 3,024.00 13.00 13.90 13.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 3,950.00 15.00 18.40 16.80 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 209.00 14.00 13.75 17.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 3,144.00 12.00 20.10 24.34 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 128.00 15.00 53.20 45.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 7,149.00 10.00 16.27 18.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 969.00 20.00 20.45 18.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 4,832.00 13.00 17.52 19.15 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 187.00 20.00 32.40 33.60 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1,300.00 13.00 21.54 29.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 24,892.00 12.67 17.78 19.06 IM0761-226 I76/SH52 Interchange 04/02/20 45.00 20.00 17.55 15.90 SFTY2254-091 225 Ramp Improvements 04/09/20 1,240.00 20.00 15.50 16.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 4,313.00 10.00 14.59 13.75 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1601-082 Hawkins Signal and Curb Ramps 04/30/20 126.00 15.00 29.00 25.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 1,077.00 40.00 18.67 17.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 129.00 20.00 28.33 25.00 MTCE R100-341 Various Highways in Region 1 05/21/20 282,150.00 9.20 10.50 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 289,080.00 9.38 10.82 10.12 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 85.00 25.00 59.56 42.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 441.00 21.84 21.84 21.84 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 297.00 12.00 22.57 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 823.00 18.62 26.86 23.26 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 5,208.00 17.00 17.11 14.25 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 8,718.00 10.00 18.12 18.53 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 4,718.00 18.00 15.73 14.08 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 74.00 20.00 32.50 33.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 600.00 22.76 22.76 22.76 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 3,204.00 20.00 17.37 26.20 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1,183.00 14.47 17.42 17.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 23,705.00 15.06 17.34 17.84 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 338,500.00 10.04 12.37 11.35 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 566 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-01011 Preform Plastic Pvmt Mkg (Contr)(Inlaid) Sq Foot ================================================ FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 3,024.00 13.00 13.90 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,024.00 13.00 13.90 13.00 SFTY2254-091 225 Ramp Improvements 04/09/20 1,240.00 20.00 15.50 16.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 4,313.00 10.00 14.59 13.75 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP MTCE R100-341 Various Highways in Region 1 05/21/20 72,488.00 9.60 10.50 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 78,041.00 9.79 11.34 10.30 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 16,203.00 17.80 21.22 21.22 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 16,203.00 17.80 21.22 21.22 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 97,268.00 11.22 12.23 12.21 =============== 627-02010 Preform Plastic Pvmt Mkg (Ty II)(Inlaid) Sq Foot ================================================ FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 908.00 11.00 19.61 18.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 9,846.00 11.00 14.75 18.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 1,278.00 15.00 28.21 26.33 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 89.00 20.00 49.05 50.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12,121.00 11.49 16.89 19.12 IM0761-226 I76/SH52 Interchange 04/02/20 916.00 20.00 18.19 15.90 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 2,981.00 20.00 21.67 20.00 MTCE R100-341 Various Highways in Region 1 05/21/20 24,849.00 9.60 11.25 10.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 28,746.00 11.01 13.37 11.66 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 9,465.00 13.00 13.39 14.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9,465.00 13.00 13.39 14.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50,332.00 11.50 13.98 13.91 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 567 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-30105 Pvmt Mkg Paint (WS) Sq Foot ================================================ NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 1,307.00 20.00 19.97 20.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,307.00 20.00 19.97 20.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,307.00 20.00 19.97 20.30 =============== 627-30205 Thermoplastic Pvmt Mkg (WS) Sq Foot ================================================ FSA2873-194 US 287 Longmont Intersection 02/13/20 221.00 20.00 23.77 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 221.00 20.00 23.77 21.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 272.00 20.00 19.64 17.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 272.00 20.00 19.64 17.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 493.00 20.00 21.34 18.79 =============== 627-30210 Thermoplastic Pvmt Mkg (XS) Sq Foot ================================================ FSA2873-194 US 287 Longmont Intersection 02/13/20 114.00 20.00 20.53 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 114.00 20.00 20.53 21.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 980.00 12.00 12.93 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 980.00 12.00 12.93 12.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,094.00 12.83 13.62 12.94 =============== 627-30323 Preform Plastic Pvmt Mkg (WS)(Typ I)(In) Sq Foot ================================================ SHE 0703-461 I-70 and Kipling North Phase 03/26/20 250.00 14.40 34.40 44.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 250.00 14.40 34.40 44.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 568 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-30323 Preform Plastic Pvmt Mkg (WS)(Typ I)(In) Sq Foot ================================================ IM0761-226 I76/SH52 Interchange 04/02/20 1,737.00 20.00 24.30 21.20 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 325.00 30.00 45.00 48.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,062.00 21.58 25.84 25.42 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1,648.00 38.94 45.07 45.07 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,648.00 38.94 45.07 45.07 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,960.00 28.35 28.48 34.77 =============== 627-30327 Preform Plastic Pvmt Mkg (WS) (Ty III) Sq Foot ================================================ NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 1,069.00 18.00 17.50 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,069.00 18.00 17.50 20.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,069.00 18.00 17.50 20.00 =============== 627-30328 Pre Plastic Pvmt Mkg (XWalk)(Typ1)(In) Sq Foot ================================================ SHE 0703-461 I-70 and Kipling North Phase 03/26/20 450.00 11.75 18.00 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 450.00 11.75 18.00 15.00 IM0761-226 I76/SH52 Interchange 04/02/20 1,600.00 15.00 16.05 15.90 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 772.00 15.00 19.00 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,372.00 15.00 16.55 15.93 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 23.00 50.00 54.59 54.59 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 23.00 50.00 54.59 54.59 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 569 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-30328 Pre Plastic Pvmt Mkg (XWalk)(Typ1)(In) Sq Foot ================================================ NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 2,022.00 14.47 17.49 17.49 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,022.00 14.47 17.49 17.49 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,867.00 14.64 16.89 16.68 =============== 627-30329 Preform Plastic Pvmt Mkg (XS) (TY I) Sq Foot ================================================ NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 2,494.00 14.00 13.08 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,494.00 14.00 13.08 14.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,494.00 14.00 13.08 14.00 =============== 627-30332 Preform Plastic Pvmt Mkg (XS) (Ty III) Sq Foot ================================================ NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 4,962.00 12.00 10.88 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,962.00 12.00 10.88 12.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,962.00 12.00 10.88 12.00 =============== 627-30405 Preform Thermoplastic Pvmt Mkg (WS) Sq Foot ================================================ FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 290.00 12.00 28.54 26.00 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 322.00 16.00 20.67 18.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 286.00 20.00 31.00 31.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 1,877.00 14.00 17.11 18.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 44.00 25.00 32.91 30.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STA006A-067 SH 6 Merino to Atwood 01/16/20 456.00 20.00 18.74 19.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 453.00 20.00 29.15 27.30 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 138.00 17.00 25.00 30.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 273.00 17.00 18.86 24.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 89.00 25.00 32.37 30.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 939.00 15.00 17.83 18.40 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 1,134.00 20.00 17.66 16.24 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 415.00 20.00 22.50 22.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 570 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-30405 Preform Thermoplastic Pvmt Mkg (WS) Sq Foot ================================================ STR2871-038 US 287 Passing Lanes Springfi 03/05/20 232.00 20.00 32.60 30.42 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1,918.00 16.50 16.72 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8,866.00 16.97 18.56 20.11 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 17.00 30.00 18.93 18.00 SFTY2254-091 225 Ramp Improvements 04/09/20 226.00 50.00 24.00 24.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 872.00 13.00 18.75 18.70 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 318.00 16.97 23.03 18.50 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 101.00 17.00 26.50 24.50 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 165.00 20.00 20.26 18.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 15.00 20.00 45.33 31.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 148.00 30.00 29.32 28.00 MTCE R100-341 Various Highways in Region 1 05/21/20 74,908.00 11.00 12.50 12.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 612.00 20.00 17.97 17.34 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 77,382.00 11.30 13.20 12.24 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 32.00 25.00 53.50 37.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 1,245.00 21.00 18.50 20.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 116.00 21.84 21.84 21.84 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 1,199.00 15.00 19.59 20.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 586.00 25.00 23.16 22.25 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 108.00 18.00 22.03 18.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,286.00 19.49 20.80 20.59 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 1,850.00 20.00 18.60 17.00 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 341.00 14.00 18.12 18.53 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 609.00 20.00 21.50 22.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 250.00 20.90 20.90 20.90 STA141A-051 This will be a chipseal proje 12/17/20 2,381.00 18.00 18.05 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5,431.00 18.79 18.45 16.52 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 94,965.00 12.54 14.89 13.51 =============== 627-30407 Preform Thermoplastic Pvmt Mkg (WS)(Sp) Sq Foot ================================================ C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 228.00 20.00 20.50 21.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 571 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-30407 Preform Thermoplastic Pvmt Mkg (WS)(Sp) Sq Foot ================================================ NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1,488.00 25.00 21.55 20.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 365.00 20.00 16.35 16.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,081.00 23.58 20.79 19.55 MTCER300-259 MTCE R3 FY20/21 Region Wide S 04/02/20 10,363.00 14.00 18.13 16.25 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 560.00 20.00 19.88 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10,923.00 14.31 18.26 16.24 MTCER300-258 MTCE R3 FY20 Region Roundabou 07/09/20 3,600.00 33.00 30.67 23.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,600.00 33.00 30.67 23.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 32.00 30.00 44.29 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 32.00 30.00 44.29 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16,636.00 19.54 22.17 18.18 =============== 627-30408 Pre Thermo Pvmt Mkg (Shield) Sq Foot ================================================ MTCE R100-341 Various Highways in Region 1 05/21/20 7,568.00 24.00 20.25 18.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7,568.00 24.00 20.25 18.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,568.00 24.00 20.25 18.50 =============== 627-30410 Preform Thermoplastic Pvmt Mkg (XS) Sq Foot ================================================ STA0142-066 SH 14 New Raymer West 01/09/20 348.00 20.00 19.94 18.25 FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 48.00 12.00 16.38 15.00 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 1,036.00 17.00 13.83 14.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 120.00 15.00 20.00 20.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 880.00 20.00 12.40 13.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 572 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-30410 Preform Thermoplastic Pvmt Mkg (XS) Sq Foot ================================================ FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STA006A-067 SH 6 Merino to Atwood 01/16/20 119.00 20.00 12.54 12.75 STR141A-044 SH 141 AND SH 145, FROM SLICK 01/30/20 102.00 20.00 40.22 39.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 1,118.00 20.00 13.00 12.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 1,132.00 13.00 17.36 21.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 2,292.00 12.50 13.33 14.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7,195.00 15.94 14.19 15.44 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 760.00 20.00 16.70 15.32 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 590.00 12.00 13.98 13.75 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 3,648.00 12.06 13.75 11.50 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 2,989.00 17.00 24.58 16.50 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 335.00 15.00 15.56 13.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 3,861.00 16.00 11.00 11.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 70.00 25.00 23.87 23.00 MTCE R100-341 Various Highways in Region 1 05/21/20 160,110.00 8.75 9.63 9.25 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 50.00 17.00 37.00 32.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 172,413.00 9.21 10.35 9.52 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 2,743.00 12.00 13.00 14.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 1,128.00 12.00 12.67 12.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 2,924.00 15.00 15.93 12.50 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 2,572.00 20.00 16.70 13.70 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 2,591.00 10.00 12.56 12.90 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 24.00 30.00 27.32 26.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 11,982.00 14.05 14.70 13.17 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 364.00 25.00 24.33 25.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 3,620.00 14.00 13.87 13.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 100.00 25.00 24.69 22.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 4,274.00 12.50 13.00 13.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 98.00 15.00 15.00 15.00 CR100-342 US-6 at Garrison 12/17/20 2,770.00 15.00 17.79 11.75 STA141A-051 This will be a chipseal proje 12/17/20 1,128.00 14.00 15.45 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 12,354.00 14.13 15.78 13.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 203,944.00 10.03 11.57 10.17 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 573 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-30411 Preform Thermoplastic Pvmt Mkg (XS)(Sp) Sq Foot ================================================ STR0101-027 SH 10 Overlay La Junta West 02/27/20 134.00 20.00 24.58 19.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 1,700.00 18.00 16.50 17.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 1,077.00 11.00 12.08 12.85 STRR300-249 Grand and Jackson Counties AD 03/05/20 1,218.00 20.00 21.33 17.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 2,678.00 20.00 16.50 15.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1,182.00 15.00 10.80 11.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7,989.00 17.62 16.18 14.95 MTCER300-259 MTCE R3 FY20/21 Region Wide S 04/02/20 42,618.00 11.50 13.63 12.25 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 180.00 20.00 25.54 20.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 613.00 20.00 14.38 12.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 3,871.00 10.00 12.86 11.32 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 47,282.00 11.52 13.58 12.20 STMM086-083 ADA PUEBLO METRO 07/09/20 320.00 20.00 31.00 30.00 MTCER300-258 MTCE R3 FY20 Region Roundabou 07/09/20 3,000.00 21.00 21.08 16.25 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 20.00 30.00 20.67 18.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 456.00 15.00 12.85 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,796.00 20.24 20.64 17.03 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 112.00 20.00 26.53 24.10 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 600.00 11.00 13.22 13.59 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 712.00 12.42 15.31 15.24 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 59,779.00 12.90 14.55 12.91 =============== 629-01001 Survey Monument (Ty 1) Each =================================================== NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 12.00 800.00 1113.25 415.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12.00 800.00 1113.25 415.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 574 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 629-01001 Survey Monument (Ty 1) Each =================================================== STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 3.00 400.00 663.33 600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 400.00 663.33 600.00 CR100-342 US-6 at Garrison 12/17/20 3.00 500.00 686.67 700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 500.00 686.67 700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18.00 683.33 1017.90 493.33 =============== 629-01006 Survey Monument (Ty 6) Each =================================================== STRR300-249 Grand and Jackson Counties AD 03/05/20 5.00 700.00 534.83 195.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 17.00 150.00 495.00 590.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 22.00 275.00 504.05 500.23 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 1.00 700.00 910.00 1400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 700.00 910.00 1400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 23.00 293.48 532.64 539.35 =============== 629-01031 Survey Monument (Ty 3A) Each =================================================== STA0142-066 SH 14 New Raymer West 01/09/20 1.00 800.00 600.62 650.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 16.00 700.00 777.33 1182.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 2.00 750.00 862.50 625.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 19.00 710.53 770.79 1095.37 CR100-342 US-6 at Garrison 12/17/20 2.00 910.00 1149.17 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 910.00 1149.17 1500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21.00 729.52 837.57 1133.90 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 575 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 629-01050 Monument Box Each =================================================== STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 7.00 180.00 969.80 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 7.00 180.00 969.80 2000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 180.00 969.80 2000.00 =============== 629-01065 Survey Monument (Ty 5S) Each =================================================== STRR300-249 Grand and Jackson Counties AD 03/05/20 9.00 750.00 534.83 195.00 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 3.00 750.00 2038.75 900.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 26.00 500.00 782.00 590.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 38.00 578.95 853.86 520.92 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 1.00 900.00 2340.00 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 900.00 2340.00 1000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 39.00 587.18 891.01 533.21 =============== 629-01110 Locate Monuments Hour =================================================== C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 60.00 225.00 293.38 86.92 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 60.00 225.00 293.38 86.92 CR100-342 US-6 at Garrison 12/17/20 12.00 175.00 310.83 145.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 12.00 175.00 310.83 145.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 72.00 216.67 296.76 96.60 =============== 630-00000 Flagging Hour =================================================== STA0142-066 SH 14 New Raymer West 01/09/20 2,000.00 28.00 33.40 30.60 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 576 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00000 Flagging Hour =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 100.00 35.00 41.14 40.00 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 120.00 28.00 33.17 29.00 SHER500-210 R5 FY19 CENTER LINE RUMBLE ST 01/09/20 650.00 25.00 40.50 29.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 80.00 35.00 36.00 36.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 7,408.00 28.00 32.22 30.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 3,500.00 28.00 31.33 26.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STA006A-067 SH 6 Merino to Atwood 01/16/20 2,200.00 28.00 31.80 30.00 STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 2,800.00 25.00 23.50 27.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 3,000.00 22.00 27.65 27.30 STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 20.00 35.00 33.00 33.00 STR141A-044 SH 141 AND SH 145, FROM SLICK 01/30/20 10,020.00 30.00 25.41 22.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 2,000.00 32.00 32.50 35.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 500.00 35.00 43.30 46.37 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 200.00 30.00 41.78 36.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 600.00 25.00 33.60 40.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 2,140.00 28.00 32.00 31.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 3,125.00 24.00 28.31 28.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 920.00 35.00 33.58 30.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 2,500.00 25.00 28.78 28.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 2,700.00 24.00 30.16 30.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 2,500.00 30.00 29.85 28.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 160.00 30.00 25.25 30.50 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 1,500.00 28.00 37.13 36.50 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 15,000.00 30.00 24.16 24.48 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 3,800.00 25.00 28.00 28.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 1,725.00 25.00 23.00 23.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 4,300.00 25.00 39.70 38.61 NHPP0502-082 US 50 MONTROSE RE CHIP SEAL 03/05/20 5,000.00 27.00 24.25 22.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 1,000.00 28.00 27.45 29.80 STRR300-249 Grand and Jackson Counties AD 03/05/20 1,600.00 28.00 26.60 3.00 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 1,600.00 30.00 18.83 3.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 7,200.00 30.00 37.27 33.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 4,096.00 24.50 27.62 29.33 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 6,000.00 27.00 25.58 26.90 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1,000.00 35.00 33.60 31.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 103,064.00 27.84 28.71 27.30 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 3,800.00 24.00 25.31 23.82 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 4,000.00 25.00 32.15 29.00 IM0761-226 I76/SH52 Interchange 04/02/20 5,500.00 30.00 32.12 28.62 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 1,260.00 26.00 17.97 2.00 MTCER300-259 MTCE R3 FY20/21 Region Wide S 04/02/20 300.00 15.00 31.00 12.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 4,800.00 32.00 37.14 31.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 577 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00000 Flagging Hour =================================================== SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 120.00 35.00 25.00 25.00 NHPP1601-077 US 160 MP 29.750 - MP 34.891 04/09/20 1,600.00 25.00 21.33 15.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 5,000.00 32.00 37.81 38.50 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 500.00 30.00 35.99 42.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 1,500.00 25.00 29.50 22.50 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 6,000.00 25.00 29.67 28.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 200.00 30.00 33.73 40.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 1,000.00 30.00 35.07 35.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 1,500.00 28.00 30.47 30.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 500.00 30.00 37.00 37.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 2,000.00 32.00 30.00 25.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 500.00 30.00 30.42 30.42 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 40.00 35.00 56.11 39.00 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 326.00 25.00 29.35 24.00 NH050A-037 US 50A Pueblo Regional Pond SHER400-373 R4 Signal Head Backplate Inst 05/28/20 940.00 35.00 45.90 50.00 IM025A-048 Northbound I-25 bridge at Exi 05/28/20 1,500.00 52.00 30.79 30.00 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 100.00 30.00 33.50 35.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 70.00 30.00 31.14 31.20 NHPPR100-251 SH 2/ Vasquez 06/25/20 100.00 30.00 33.35 31.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 43,156.00 29.06 32.61 28.80 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 1,500.00 26.00 34.94 31.00 STMM086-083 ADA PUEBLO METRO 07/09/20 140.00 30.00 33.00 30.00 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 48.00 40.00 39.05 32.00 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 696.00 29.00 32.00 22.00 MTCER300-258 MTCE R3 FY20 Region Roundabou 07/09/20 320.00 25.00 29.67 25.00 MTCER300-255 MTCE R3 FY20/21 Signal Replac 07/09/20 700.00 20.00 25.25 20.00 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 200.00 35.00 30.00 30.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 400.00 35.00 29.00 30.00 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 320.00 30.00 25.00 25.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 500.00 30.00 24.50 29.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 100.00 35.00 34.30 34.00 STR184B-006 CULVERTS SH 184 08/06/20 910.00 27.00 21.50 21.50 IM0252-498 I-25 Maintenance Region 2 Pue 08/19/20 288.00 27.69 27.69 27.69 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 400.00 25.00 29.64 26.75 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 1,600.00 30.00 8.33 3.00 SHER400-379 Signal Head Backplate Install 08/20/20 264.00 45.00 35.50 35.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 400.00 36.75 27.18 22.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 700.00 27.72 27.72 27.72 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 3,000.00 33.00 37.83 30.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 2,000.00 30.00 38.64 31.18 MTCE0702-386 Grand Junction 09/03/20 480.00 35.00 15.33 28.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 578 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00000 Flagging Hour =================================================== SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 240.00 31.00 33.14 26.00 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 936.00 35.00 29.88 32.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 4,500.00 27.00 27.06 28.80 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 3,600.00 25.00 24.73 15.80 SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 140.00 35.00 30.00 30.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 520.00 30.00 28.76 27.50 CR400-374 FY 20 Culvert Prioritization 09/17/20 600.00 28.00 31.75 35.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1,000.00 28.00 30.42 30.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 26,502.00 28.89 29.16 25.37 MPC040-061 R2 FY 21 Sign Replacement 10/01/20 10.00 30.79 20.00 20.00 MTCE0253-271 FY20 I-25 SIGN REPL PHASE 1 10/08/20 40.00 27.00 28.67 20.00 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 1,200.00 30.00 24.67 11.00 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 990.00 30.00 24.90 29.40 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 2,570.00 30.00 32.68 28.05 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 3,500.00 30.00 26.70 25.10 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 80.00 38.00 33.05 35.00 NHPP0702-407 PR I-70 Glenwood Springs Griz 11/03/20 1,030.00 28.00 32.93 30.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 5,500.00 30.00 29.47 29.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 4,150.00 32.00 29.91 27.00 C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 2,200.00 30.00 29.93 30.50 ITSITSB-002 ITS CV ROADSIDE UNITS 11/12/20 40.00 30.00 36.33 46.00 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 48.00 28.00 31.75 32.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 300.00 30.00 32.81 35.00 FSA1211-098 SH 121 & 1ST AVE 11/19/20 30.00 35.00 56.83 30.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 95.00 27.00 40.50 38.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 3,210.00 29.00 30.80 32.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 4,000.00 28.00 35.86 30.00 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 1,200.00 30.00 35.07 36.16 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 2,280.00 35.00 33.67 28.70 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 1,000.00 30.00 27.50 27.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1,950.00 32.75 32.75 32.75 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 16,500.00 25.00 31.22 36.00 CR100-342 US-6 at Garrison 12/17/20 2,800.00 30.00 30.17 21.00 STA141A-051 This will be a chipseal proje 12/17/20 2,304.00 27.00 33.20 33.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 3,000.00 28.43 30.42 30.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 60,027.00 28.63 31.13 30.59 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 232,749.00 28.39 30.24 28.21 =============== 630-00001 Pilot Car Operation Hour =================================================== STA0142-066 SH 14 New Raymer West 01/09/20 500.00 50.50 88.88 75.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 579 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00001 Pilot Car Operation Hour =================================================== STA006A-067 SH 6 Merino to Atwood 01/16/20 500.00 50.50 67.60 68.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 1,000.00 50.00 56.26 52.51 STR141A-044 SH 141 AND SH 145, FROM SLICK 01/30/20 1,670.00 50.00 49.22 40.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 550.00 65.00 82.95 92.74 NHPP0502-082 US 50 MONTROSE RE CHIP SEAL 03/05/20 1,100.00 60.00 47.50 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,320.00 53.71 56.72 53.73 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 880.00 60.00 64.80 59.00 NHPP1601-077 US 160 MP 29.750 - MP 34.891 04/09/20 200.00 45.00 50.00 50.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 100.00 50.00 82.90 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,180.00 56.61 63.50 58.83 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 5,600.00 20.00 43.10 47.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5,600.00 20.00 43.10 47.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 500.00 50.00 61.50 70.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 200.00 50.00 69.90 57.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 4,000.00 35.00 64.43 74.60 STA141A-051 This will be a chipseal proje 12/17/20 340.00 55.00 69.80 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5,040.00 38.43 64.68 72.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17,140.00 38.40 54.26 57.49 =============== 630-00003 Uniformed Traf Ctrl Hour =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 200.00 110.00 95.19 96.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 150.00 110.00 137.50 150.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 1,200.00 100.00 146.67 153.14 FSA2873-194 US 287 Longmont Intersection 02/13/20 16.00 80.00 133.28 116.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 900.00 104.00 88.67 82.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 128.00 100.00 81.00 84.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 400.00 100.00 122.80 99.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,994.00 102.26 116.01 117.39 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 580 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00003 Uniformed Traf Ctrl Hour =================================================== IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 1,000.00 100.00 125.50 125.00 SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 200.00 100.00 120.00 120.00 SFTY2254-091 225 Ramp Improvements 04/09/20 32.00 150.00 143.50 137.00 C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 96.00 105.50 148.12 187.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 96.00 95.00 131.67 95.00 MTCER200-265 Pueblo 05/28/20 900.00 100.00 91.25 85.00 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 16.00 125.00 128.50 125.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 24.00 100.00 148.00 165.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 120.00 145.00 117.31 115.56 NHPPR100-251 SH 2/ Vasquez 06/25/20 750.00 90.00 124.18 112.36 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,234.00 99.98 111.60 111.64 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 144.00 100.00 130.50 111.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 80.00 100.00 120.33 124.00 SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 240.00 75.00 130.00 125.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 160.00 98.00 119.67 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 624.00 89.87 125.20 117.79 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 200.00 150.00 115.33 151.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 48.00 100.00 86.23 95.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 150.00 100.00 76.50 50.00 FSA1211-098 SH 121 & 1ST AVE 11/19/20 25.00 250.00 123.50 150.00 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 350.00 110.00 113.57 106.25 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 28.00 135.00 127.50 125.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 700.00 145.30 145.30 145.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,501.00 133.27 113.14 125.52 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,353.00 106.03 114.46 116.66 =============== 630-00004 Traf Ctrl Vehicle Each =================================================== NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 1.00 5000.00 3850.00 4200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 5000.00 3850.00 4200.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 581 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00004 Traf Ctrl Vehicle Each =================================================== C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 2.00 3750.00 2199.95 1250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 3750.00 2199.95 1250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 4166.67 2612.46 2233.33 =============== 630-00006 Uniformed Traf Ctrl (Vehicle) Hour =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 200.00 47.00 20.38 31.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 400.00 18.00 30.20 33.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 600.00 27.67 27.93 32.33 SFTY2254-091 225 Ramp Improvements 04/09/20 32.00 150.00 29.50 24.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 32.00 150.00 29.50 24.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 20.00 45.00 111.14 42.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20.00 45.00 111.14 42.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 150.00 35.00 35.50 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 150.00 35.00 35.50 6.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 802.00 34.35 32.72 27.32 =============== 630-00007 Traf Ctrl Inspection Day ==================================================== STA0142-066 SH 14 New Raymer West 01/09/20 20.00 202.00 438.50 410.00 FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 30.00 250.00 598.62 225.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 582 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00007 Traf Ctrl Inspection Day ==================================================== NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 8.00 250.00 230.00 185.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 12.00 210.00 350.00 350.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 153.00 225.00 421.07 203.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 120.00 240.00 262.21 225.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STA006A-067 SH 6 Merino to Atwood 01/16/20 20.00 202.00 227.01 230.00 STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 50.00 250.00 307.50 350.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 50.00 150.00 311.27 262.53 STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 20.00 265.00 350.00 350.00 STR141A-044 SH 141 AND SH 145, FROM SLICK 01/30/20 86.00 350.00 180.76 150.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 58.00 250.00 225.00 250.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 80.00 250.00 704.08 993.63 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 5.00 250.00 268.68 240.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 40.00 150.00 169.00 50.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 92.00 200.00 820.00 820.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 40.00 180.00 208.95 220.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 28.00 230.00 292.67 176.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 55.00 185.00 189.17 220.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 36.00 180.00 319.97 340.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 120.00 500.00 298.54 53.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 28.00 250.00 385.00 370.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 44.00 265.00 532.57 515.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 80.00 300.00 191.30 198.91 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 44.00 250.00 245.00 245.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 26.00 100.00 90.00 90.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 48.00 200.00 706.49 702.00 NHPP0502-082 US 50 MONTROSE RE CHIP SEAL 03/05/20 35.00 300.00 282.50 300.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 102.00 250.00 191.44 227.54 STRR300-249 Grand and Jackson Counties AD 03/05/20 30.00 175.00 339.83 400.00 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 10.00 300.00 181.00 300.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 111.00 500.00 358.33 280.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 209.00 200.00 118.95 205.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 91.00 200.00 162.00 168.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 80.00 250.00 228.60 132.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,061.00 259.48 266.77 288.75 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 32.00 110.00 131.11 108.29 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 18.00 300.00 281.50 210.00 IM0761-226 I76/SH52 Interchange 04/02/20 120.00 200.00 233.72 212.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 15.00 200.00 275.00 500.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 50.00 400.00 387.46 295.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 48.00 167.00 111.06 111.11 SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 60.00 250.00 190.00 190.00 NHPP1601-077 US 160 MP 29.750 - MP 34.891 04/09/20 25.00 110.00 193.33 145.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 583 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00007 Traf Ctrl Inspection Day ==================================================== SFTY2254-091 225 Ramp Improvements 04/09/20 50.00 300.00 350.00 322.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 275.00 250.00 220.41 220.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 31.00 203.00 134.99 187.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 52.00 120.00 132.00 76.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 44.00 200.00 386.00 113.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 26.00 225.00 256.25 225.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 40.00 225.00 175.00 145.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 50.00 240.00 303.13 225.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 10.00 250.00 253.75 241.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 20.00 300.00 374.17 425.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 152.00 161.00 162.94 162.94 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 5.00 250.00 472.76 125.00 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 70.00 75.00 121.69 70.00 NH050A-037 US 50A Pueblo Regional Pond IM025A-048 Northbound I-25 bridge at Exi 05/28/20 30.00 270.00 370.13 360.00 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 5.00 200.00 162.50 50.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 22.00 200.00 210.33 234.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 38.00 200.00 93.93 113.66 NHPPR100-251 SH 2/ Vasquez 06/25/20 25.00 225.00 225.65 204.29 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,313.00 213.11 223.65 195.23 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 50.00 220.00 165.81 75.00 STMM086-083 ADA PUEBLO METRO 07/09/20 98.00 200.00 220.00 90.00 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 5.00 200.00 299.85 313.50 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 32.00 200.00 310.00 80.00 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 15.00 300.00 355.00 350.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 20.00 300.00 350.00 350.00 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 10.00 170.00 70.00 70.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 20.00 200.00 414.50 79.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 40.00 250.00 194.33 118.00 STR184B-006 CULVERTS SH 184 08/06/20 17.00 200.00 80.00 80.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 64.00 300.00 504.14 590.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 46.00 200.00 153.33 30.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 248.00 218.05 259.60 260.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 63.00 138.60 138.60 138.60 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 56.00 400.00 307.50 120.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 32.00 250.00 349.95 124.75 MTCE0702-386 Grand Junction 09/03/20 20.00 500.00 233.33 250.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 60.00 250.00 185.86 160.00 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 9.00 300.00 235.60 150.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 25.00 200.00 214.67 247.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 81.00 180.00 441.68 80.00 SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 70.00 250.00 350.00 450.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 584 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00007 Traf Ctrl Inspection Day ==================================================== STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 50.00 210.00 195.29 165.00 CR400-374 FY 20 Culvert Prioritization 09/17/20 9.00 265.00 360.75 235.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 120.00 200.00 217.26 217.26 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,260.00 230.85 288.49 203.90 MPC040-061 R2 FY 21 Sign Replacement 10/01/20 4.00 155.51 150.00 200.00 MTCE0253-271 FY20 I-25 SIGN REPL PHASE 1 10/08/20 20.00 270.00 122.67 100.00 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 123.00 175.00 153.33 125.00 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 58.00 200.00 467.20 424.00 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 100.00 150.00 198.78 146.35 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 62.00 400.00 509.00 477.00 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 15.00 250.00 243.04 60.00 NHPP0702-407 PR I-70 Glenwood Springs Griz 11/03/20 34.00 400.00 137.64 124.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 52.00 400.00 424.67 500.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 84.00 400.00 251.04 282.50 C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 45.00 400.00 104.90 58.00 ITSITSB-002 ITS CV ROADSIDE UNITS 11/12/20 5.00 250.00 168.00 100.00 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 24.00 225.00 242.50 185.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 30.00 250.00 164.25 57.00 FSA1211-098 SH 121 & 1ST AVE 11/19/20 4.00 200.00 123.50 150.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 140.00 250.00 243.00 251.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 43.00 300.00 339.50 330.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 55.00 300.00 363.20 305.00 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 24.00 250.00 230.87 253.76 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 40.00 250.00 320.56 160.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 38.00 200.00 195.00 190.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 165.00 106.06 106.06 106.06 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 140.00 220.00 350.00 367.00 CR100-342 US-6 at Garrison 12/17/20 34.00 235.00 317.50 500.00 STA141A-051 This will be a chipseal proje 12/17/20 32.00 300.00 103.80 55.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 820.00 152.28 162.94 162.94 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,191.00 211.05 259.31 209.38 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,825.00 229.73 259.44 229.61 =============== 630-00012 Traf Ctrl Mgmt Day ==================================================== STA0142-066 SH 14 New Raymer West 01/09/20 51.00 900.00 1249.75 1200.00 FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 70.00 1250.00 856.96 1000.00 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 40.00 875.00 1206.67 1185.00 SHER500-210 R5 FY19 CENTER LINE RUMBLE ST 01/09/20 40.00 800.00 1000.50 1.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 585 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00012 Traf Ctrl Mgmt Day ==================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 60.00 800.00 825.00 825.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 137.00 800.00 1725.66 1128.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 185.00 725.00 891.95 900.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STA006A-067 SH 6 Merino to Atwood 01/16/20 50.00 900.00 1135.03 1150.00 STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 70.00 800.00 862.50 985.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 110.00 850.00 870.04 840.08 STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 50.00 800.00 825.00 825.00 STR141A-044 SH 141 AND SH 145, FROM SLICK 01/30/20 190.00 1000.00 863.61 750.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 145.00 1250.00 1300.00 1100.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 70.00 1000.00 1619.91 1589.81 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 200.00 725.00 1016.28 960.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 50.00 800.00 974.00 720.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 80.00 925.00 1452.50 1505.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 100.00 730.00 1060.20 1100.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 70.00 900.00 980.00 1100.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 110.00 815.00 919.45 1100.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 90.00 730.00 1154.94 1200.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 300.00 1000.00 827.18 925.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 70.00 1000.00 1225.00 1050.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 90.00 915.00 1928.58 1710.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 230.00 750.00 885.78 882.35 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 111.00 900.00 797.50 700.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 75.00 725.00 650.00 650.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 120.00 950.00 1703.49 1755.00 NHPP0502-082 US 50 MONTROSE RE CHIP SEAL 03/05/20 80.00 1000.00 925.00 850.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 68.00 825.00 1112.23 953.48 STRR300-249 Grand and Jackson Counties AD 03/05/20 75.00 1000.00 1159.84 1400.00 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 25.00 1000.00 760.50 1000.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 250.00 1000.00 1366.67 1200.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 527.00 820.00 644.45 709.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 150.00 800.00 852.00 896.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 115.00 1500.00 1127.00 880.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,254.00 898.47 955.79 988.23 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 70.00 1000.00 1234.74 1611.30 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 50.00 1000.00 1107.50 925.00 IM0761-226 I76/SH52 Interchange 04/02/20 275.00 900.00 881.27 881.82 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 35.00 1000.00 973.33 1400.00 MTCER300-259 MTCE R3 FY20/21 Region Wide S 04/02/20 100.00 200.00 1100.00 200.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 108.00 1000.00 1242.54 985.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 120.00 1400.00 1081.95 1138.89 SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 150.00 1000.00 1200.00 1200.00 NHPP1601-077 US 160 MP 29.750 - MP 34.891 04/09/20 25.00 800.00 683.33 600.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 586 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00012 Traf Ctrl Mgmt Day ==================================================== SFTY2254-091 225 Ramp Improvements 04/09/20 100.00 1200.00 1390.00 1455.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 300.00 1200.00 932.08 935.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 85.00 850.00 987.05 1215.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 130.00 700.00 736.33 609.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 100.00 800.00 1159.00 838.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 65.00 750.00 895.63 750.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 120.00 900.00 1108.33 1240.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 95.00 900.00 1023.08 975.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 150.00 850.00 894.50 1055.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 34.00 900.00 1255.00 1200.00 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 180.00 1500.00 1072.75 250.00 MTCER200-265 Pueblo 05/28/20 30.00 825.00 282.50 200.00 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 106.00 550.00 528.50 353.00 NH050A-037 US 50A Pueblo Regional Pond SHER400-373 R4 Signal Head Backplate Inst 05/28/20 90.00 1385.00 1491.00 1530.00 IM025A-048 Northbound I-25 bridge at Exi 05/28/20 61.00 1000.00 814.83 820.00 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 115.00 1250.00 511.50 275.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 55.00 800.00 750.67 759.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 95.00 1200.00 642.63 683.14 NHPPR100-251 SH 2/ Vasquez 06/25/20 59.00 850.00 1104.33 1037.66 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,903.00 993.01 930.86 883.81 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 85.00 760.00 1111.19 1050.00 STMM086-083 ADA PUEBLO METRO 07/09/20 216.00 600.00 1050.00 1100.00 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 45.00 800.00 1169.63 880.00 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 45.00 800.00 800.00 675.00 MTCER300-258 MTCE R3 FY20 Region Roundabou 07/09/20 35.00 500.00 1266.67 1100.00 MTCER300-255 MTCE R3 FY20/21 Signal Replac 07/09/20 180.00 1000.00 512.50 300.00 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 38.00 900.00 900.00 900.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 50.00 750.00 837.50 875.00 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 30.00 1000.00 650.00 650.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 140.00 800.00 699.50 999.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 120.00 950.00 916.00 918.00 STR184B-006 CULVERTS SH 184 08/06/20 35.00 800.00 510.00 510.00 IM0252-498 I-25 Maintenance Region 2 Pue 08/19/20 12.00 886.17 886.17 886.17 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 160.00 1200.00 818.14 590.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 92.00 850.00 693.33 500.00 SHER400-379 Signal Head Backplate Install 08/20/20 50.00 1500.00 1252.50 1155.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 20.00 766.57 709.48 430.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 142.00 665.28 665.28 665.28 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 140.00 1000.00 850.00 525.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 80.00 925.00 865.04 561.21 MTCE0702-386 Grand Junction 09/03/20 55.00 1000.00 1133.33 600.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 587 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00012 Traf Ctrl Mgmt Day ==================================================== SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 120.00 1250.00 1160.57 900.00 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 56.00 1200.00 1075.00 1200.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 340.00 1500.00 1113.62 1690.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 190.00 950.00 591.96 486.00 SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 160.00 1000.00 1275.00 1100.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 124.00 750.00 694.67 660.00 CR400-374 FY 20 Culvert Prioritization 09/17/20 28.00 950.00 701.75 675.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,788.00 983.26 899.83 874.02 MPC040-061 R2 FY 21 Sign Replacement 10/01/20 100.00 874.61 900.00 950.00 MTCE0253-271 FY20 I-25 SIGN REPL PHASE 1 10/08/20 50.00 1000.00 789.33 400.00 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 164.00 850.00 921.67 825.00 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 144.00 750.00 963.40 972.00 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 249.00 900.00 1215.05 945.16 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 124.00 2400.00 2570.00 2410.00 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 375.00 1000.00 762.21 150.00 NHPP0702-407 PR I-70 Glenwood Springs Griz 11/03/20 65.00 1200.00 943.74 850.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 128.00 1200.00 1143.33 970.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 95.00 1000.00 1278.73 995.00 C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 110.00 1200.00 974.42 995.00 ITSITSB-002 ITS CV ROADSIDE UNITS 11/12/20 220.00 950.00 1437.00 1330.00 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 60.00 750.00 828.25 846.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 75.00 750.00 953.25 766.00 FSA1211-098 SH 121 & 1ST AVE 11/19/20 28.00 950.00 876.33 990.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 130.00 950.00 1120.00 1125.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 101.00 900.00 1278.20 1400.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 125.00 900.00 934.38 770.00 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 60.00 750.00 1195.38 1332.23 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 95.00 900.00 1328.18 1060.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 100.00 820.00 1120.00 1390.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 300.00 996.96 996.96 996.96 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 320.00 750.00 959.00 1110.00 CR100-342 US-6 at Garrison 12/17/20 84.00 750.00 941.67 1500.00 STA141A-051 This will be a chipseal proje 12/17/20 72.00 1000.00 882.60 715.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,374.00 975.25 1043.66 986.34 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13,319.00 956.27 958.97 941.09 =============== 630-00015 Uniformed Traf Ctrl Coordination Hour =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 8.00 48.00 79.33 56.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 588 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00015 Uniformed Traf Ctrl Coordination Hour =================================================== FSA2873-194 US 287 Longmont Intersection 02/13/20 1.00 1000.00 120.00 330.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 80.00 40.00 35.40 88.56 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 89.00 51.51 37.73 88.35 IM0761-226 I76/SH52 Interchange 04/02/20 8.00 50.00 47.40 53.00 MTCER200-265 Pueblo 05/28/20 75.00 50.00 33.75 20.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 2.00 80.00 59.33 65.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 9.00 40.00 53.78 28.88 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 94.00 49.68 38.22 24.62 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 32.00 90.00 27.50 20.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 25.00 80.00 27.99 27.50 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 50.00 50.00 54.31 54.31 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 107.00 68.97 34.79 37.79 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 150.00 50.76 54.31 54.31 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 150.00 50.76 54.31 54.31 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 440.00 55.11 39.24 50.83 =============== 630-00017 Traffic Control Management (Special) Day ==================================================== NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 30.00 749.00 760.41 760.41 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 30.00 749.00 760.41 760.41 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 30.00 1000.00 1086.30 1086.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 30.00 1000.00 1086.30 1086.30 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 200.00 710.66 760.41 760.41 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 200.00 710.66 760.41 760.41 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 260.00 748.47 798.01 798.01 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 589 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00030 Courtesy Patrol Day ==================================================== NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 786.00 507.61 535.00 535.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 786.00 507.61 535.00 535.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 786.00 507.61 535.00 535.00 =============== 630-00031 Courtesy Patrol Hour =================================================== NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 400.00 125.00 236.26 280.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 400.00 125.00 236.26 280.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 400.00 125.00 236.26 280.00 =============== 630-00040 Develop Traf Incident Mgmt Plan LUMP SUM =============================================== NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 1.00 500.00 7611.10 3995.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 500.00 7611.10 3995.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 3250.00 3530.45 3530.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 3250.00 3530.45 3530.45 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1.00 2538.07 2715.73 2715.73 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 2538.07 2715.73 2715.73 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 2096.02 5815.89 3413.73 =============== 630-00041 Implement Traf Incident Mgmt Plan Month ================================================== NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 5.00 300.00 2269.86 2850.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 300.00 2269.86 2850.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 590 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00041 Implement Traf Incident Mgmt Plan Month ================================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 4.00 950.00 1031.98 1031.98 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 950.00 1031.98 1031.98 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 36.00 609.14 651.78 651.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 36.00 609.14 651.78 651.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 45.00 605.09 1120.72 929.82 =============== 630-80001 Flash Beacon (Port) Each =================================================== STA0142-066 SH 14 New Raymer West 01/09/20 2.00 1200.00 1028.25 1025.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 33.00 865.00 982.47 677.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 24.00 1000.00 997.02 1000.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STA006A-067 SH 6 Merino to Atwood 01/16/20 2.00 1200.00 686.02 700.00 STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 2.00 1500.00 1200.00 900.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 16.00 1200.00 1650.00 1800.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 12.00 1250.00 708.15 1324.85 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 4.00 850.00 1200.00 1000.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 4.00 650.00 1940.21 2000.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 10.00 650.00 1263.90 2000.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 3.00 650.00 3075.43 4000.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 10.00 640.00 1396.87 1370.00 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 2.00 1500.00 3000.00 3500.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 8.00 650.00 1213.25 2340.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 6.00 500.00 1166.67 970.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 10.00 900.00 872.00 896.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 148.00 916.18 1159.29 1314.12 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 6.00 1500.00 1255.44 1800.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 10.00 900.00 111.06 111.11 SFTY2254-091 225 Ramp Improvements 04/09/20 16.00 750.00 1192.50 1285.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 8.00 1200.00 1016.59 880.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 591 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80001 Flash Beacon (Port) Each =================================================== FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 4.00 200.00 529.75 560.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 8.00 1200.00 945.00 310.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 8.00 1000.00 1133.98 1690.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 2.00 500.00 1588.33 2000.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 2.00 642.00 651.78 651.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 64.00 941.94 969.88 985.23 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 6.00 800.00 1412.50 1425.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 8.00 700.00 1400.00 1400.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 12.00 1100.00 540.00 80.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 12.00 2500.00 694.43 500.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 2.00 1330.58 1330.58 1330.58 MTCE0702-386 Grand Junction 09/03/20 12.00 500.00 98.33 200.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 6.00 650.00 1089.02 1290.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 4.00 600.00 651.78 651.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 62.00 1105.83 741.38 679.33 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 30.00 700.00 801.00 603.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 8.00 1200.00 1586.67 1500.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 4.00 1500.00 1610.80 904.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 6.00 500.00 1278.50 2000.00 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 2.00 885.00 1477.64 1385.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 4.00 1500.00 2681.67 3110.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 25.00 609.14 651.78 651.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 79.00 792.39 1219.79 977.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 353.00 926.46 1047.45 1067.63 =============== 630-80002 Flash Beacon (Solar) Each =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 4.00 750.00 650.00 650.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 4.00 700.00 1125.06 1050.11 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 18.00 850.00 602.49 1080.80 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 33.00 850.00 1009.92 1107.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 59.00 833.05 880.93 1064.17 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 592 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80002 Flash Beacon (Solar) Each =================================================== SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 42.00 1200.00 200.00 200.00 NHPPR100-251 SH 2/ Vasquez 06/25/20 6.00 100.00 532.38 509.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 48.00 1062.50 273.86 238.72 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 4.00 850.00 1223.84 540.00 SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 42.00 1200.00 350.00 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 46.00 1169.57 591.06 503.48 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 20.00 900.00 742.50 735.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 5.00 795.46 795.46 795.46 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 25.00 879.09 748.38 747.09 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 178.00 988.36 763.63 652.14 =============== 630-80305 Flagging Station Light Each =================================================== FSA2873-194 US 287 Longmont Intersection 02/13/20 2.00 1000.00 2298.33 990.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1000.00 2298.33 990.00 SHER400-373 R4 Signal Head Backplate Inst 05/28/20 2.00 2855.00 5812.50 9125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 2855.00 5812.50 9125.00 SHER400-379 Signal Head Backplate Install 08/20/20 2.00 6000.00 2625.00 2750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 6000.00 2625.00 2750.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 3285.00 3066.50 4288.33 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 593 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80331 Barricade (3 F-A) (Temp) Each =================================================== FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 4.00 175.00 234.67 322.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 175.00 234.67 322.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 175.00 234.67 322.00 =============== 630-80335 Barricade (3 M-A) (Temp) Each =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 3.00 150.00 104.03 250.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 31.00 168.42 259.05 169.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 8.00 130.00 225.00 250.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 3.00 200.00 156.00 60.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 3.00 1500.00 253.00 83.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 2.00 825.00 299.25 160.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 4.00 150.00 330.00 160.00 STRR300-249 Grand and Jackson Counties AD 03/05/20 8.00 200.00 195.00 200.00 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 8.00 200.00 154.38 20.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 2.00 200.00 436.17 180.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 10.00 200.00 184.99 277.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 2.00 150.00 218.00 224.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 2.00 165.00 367.40 880.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 86.00 235.94 223.34 191.58 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 2.00 300.00 478.35 350.00 SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 9.00 200.00 200.00 200.00 SFTY2254-091 225 Ramp Improvements 04/09/20 8.00 175.00 217.50 120.00 C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 10.00 180.00 57.88 32.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 2.00 100.00 86.75 90.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 8.00 150.00 190.00 125.00 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 2.00 175.00 110.84 66.00 NH050A-037 US 50A Pueblo Regional Pond NHPPR100-251 SH 2/ Vasquez 06/25/20 6.00 175.00 88.48 84.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 47.00 178.72 149.82 119.19 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 4.00 150.00 131.88 60.00 STMM086-083 ADA PUEBLO METRO 07/09/20 4.00 160.00 144.50 89.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 594 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80335 Barricade (3 M-A) (Temp) Each =================================================== STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 3.00 180.00 177.50 175.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 7.00 200.00 202.50 55.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 6.00 362.00 122.33 17.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 8.00 200.00 336.67 10.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 8.00 159.14 103.71 43.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 8.00 200.00 216.33 140.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 8.00 250.00 244.65 141.27 MTCE0702-386 Grand Junction 09/03/20 6.00 200.00 66.67 100.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 4.00 150.00 113.29 160.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 2.00 170.00 97.39 191.15 SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 9.00 200.00 110.00 20.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 4.00 165.00 165.33 165.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 81.00 202.78 164.50 83.26 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 8.00 200.00 85.00 75.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 4.00 300.00 288.67 250.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 2.00 300.00 384.27 339.00 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 2.00 150.00 190.00 265.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 2.00 200.00 147.00 57.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 13.00 200.00 243.00 251.00 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 8.00 160.00 166.48 190.32 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 3.00 160.00 287.23 160.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 3.00 200.00 190.00 190.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 10.00 121.97 121.97 121.97 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 6.00 250.00 161.50 186.00 CR100-342 US-6 at Garrison 12/17/20 8.00 100.00 143.67 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 69.00 182.31 177.30 161.93 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 283.00 203.87 184.38 141.33 =============== 630-80336 Barricade (3 M-B) (Temp) Each =================================================== ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 2.00 250.00 182.20 240.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 4.00 235.00 1030.15 1025.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 16.00 250.00 526.08 994.50 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 4.00 220.00 436.00 448.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 26.00 243.08 556.55 857.08 IM0761-226 I76/SH52 Interchange 04/02/20 20.00 200.00 210.22 132.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 595 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80336 Barricade (3 M-B) (Temp) Each =================================================== CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 16.00 230.00 82.05 44.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 12.00 200.00 241.00 215.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 2.00 200.00 163.94 160.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 2.00 250.00 261.25 241.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 2.00 315.00 439.50 500.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 2.00 214.00 217.26 217.26 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 56.00 214.96 167.84 145.90 STMM086-083 ADA PUEBLO METRO 07/09/20 2.00 220.00 231.50 178.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 4.00 150.00 205.68 75.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 16.00 250.00 233.29 247.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 4.00 180.00 122.86 143.65 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 2.00 195.00 215.33 220.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 15.00 180.00 195.53 195.53 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 43.00 205.81 207.61 198.97 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 2.00 200.00 255.00 205.00 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 4.00 200.00 350.67 377.00 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 8.00 180.00 195.22 234.73 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 20.00 203.05 217.26 217.26 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 34.00 197.09 238.20 239.44 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 159.00 213.26 223.57 296.55 =============== 630-80337 Barricade (3 M-C) (Temp) Each =================================================== FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 18.00 250.00 220.00 220.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 10.00 235.00 166.52 125.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 3.00 750.00 409.65 794.91 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 4.00 240.00 654.00 672.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 35.00 287.43 235.23 293.79 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 1.00 235.00 247.77 225.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 596 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80337 Barricade (3 M-C) (Temp) Each =================================================== NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 2.00 321.00 325.89 325.89 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 292.33 261.98 292.26 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 6.00 270.00 293.30 293.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 270.00 293.30 293.30 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 6.00 304.57 325.89 325.89 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 304.57 325.89 325.89 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 287.69 245.55 297.49 =============== 630-80338 Barricade (3 M-D) (Temp) Each =================================================== STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 4.00 400.00 835.00 770.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 2.00 450.00 335.04 398.19 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 2.00 260.00 777.00 784.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 377.50 556.87 680.55 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 2.00 250.00 297.60 225.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 250.00 297.60 225.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 352.00 450.80 589.44 =============== 630-80340 Pedestrian Barricade (ADA) Lin Foot =============================================== STRR300-249 Grand and Jackson Counties AD 03/05/20 400.00 45.00 56.33 60.00 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 400.00 50.00 48.75 40.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 40.00 100.00 55.90 36.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 50.00 50.00 54.50 56.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 890.00 50.00 52.24 49.71 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 597 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80340 Pedestrian Barricade (ADA) Lin Foot =============================================== C1601-082 Hawkins Signal and Curb Ramps 04/30/20 200.00 30.00 45.33 36.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 150.00 100.00 36.33 32.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 80.00 50.00 58.33 22.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 30.00 80.00 80.23 77.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 460.00 59.57 46.94 34.93 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 1,200.00 45.00 7.67 15.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 600.00 42.00 87.00 37.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 400.00 45.00 107.74 55.22 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,200.00 44.18 60.47 28.31 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 400.00 50.00 26.33 23.00 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 100.00 50.00 48.86 36.59 CR100-342 US-6 at Garrison 12/17/20 400.00 50.00 46.13 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 900.00 50.00 40.25 38.73 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,450.00 48.11 53.47 35.38 =============== 630-80341 Const Traf Sign (A) Each =================================================== STA0142-066 SH 14 New Raymer West 01/09/20 60.00 90.50 73.38 66.50 FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 25.00 75.00 48.26 85.00 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 36.00 55.00 45.33 37.00 SHER500-210 R5 FY19 CENTER LINE RUMBLE ST 01/09/20 12.00 25.00 88.13 26.25 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 20.00 65.00 60.00 60.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 622.00 50.00 89.01 90.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 86.00 65.00 66.67 65.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STA006A-067 SH 6 Merino to Atwood 01/16/20 56.00 75.00 39.60 40.00 STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 14.00 25.00 40.00 40.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 50.00 50.00 56.26 52.51 STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 20.00 50.00 40.00 40.00 STR141A-044 SH 141 AND SH 145, FROM SLICK 01/30/20 15.00 45.00 25.69 21.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 598 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80341 Const Traf Sign (A) Each =================================================== NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 58.00 77.00 62.50 70.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 8.00 70.00 67.97 99.36 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 18.00 50.00 62.29 66.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 22.00 50.00 68.00 50.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 24.00 55.00 86.00 82.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 4.00 35.00 22.47 24.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 7.00 50.00 61.14 50.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 30.00 51.00 38.89 25.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 15.00 35.00 32.51 35.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 4.00 76.00 129.63 16.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 24.00 50.00 18.30 31.60 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 30.00 43.00 75.37 74.15 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 113.00 20.00 41.20 30.60 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 12.00 25.00 32.50 35.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 57.00 35.00 35.00 35.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 28.00 35.00 46.55 58.50 NHPP0502-082 US 50 MONTROSE RE CHIP SEAL 03/05/20 40.00 50.00 23.75 20.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 30.00 45.00 52.03 56.89 STRR300-249 Grand and Jackson Counties AD 03/05/20 84.00 50.00 29.33 5.00 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 84.00 50.00 19.94 5.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 82.00 30.00 74.90 36.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 59.00 50.00 76.64 111.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 157.00 55.00 21.80 22.40 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 48.00 65.00 79.60 61.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,054.00 50.84 62.96 57.33 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 66.00 40.00 29.89 37.90 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 130.00 50.00 33.90 32.50 IM0761-226 I76/SH52 Interchange 04/02/20 54.00 50.00 90.71 74.20 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 50.00 50.00 23.33 5.00 MTCER300-259 MTCE R3 FY20/21 Region Wide S 04/02/20 21.00 10.00 52.50 5.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 12.00 60.00 47.05 40.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 6.00 43.00 33.67 33.33 SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 24.00 75.00 50.00 50.00 NHPP1601-077 US 160 MP 29.750 - MP 34.891 04/09/20 10.00 40.00 28.33 22.00 SFTY2254-091 225 Ramp Improvements 04/09/20 12.00 45.00 85.00 60.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 78.00 75.00 54.46 44.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 20.00 55.00 50.18 32.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 112.00 35.00 47.83 43.50 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 70.00 45.00 44.67 32.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 50.00 20.00 47.44 51.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 32.00 50.00 62.00 50.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 13.00 65.00 79.58 80.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 599 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80341 Const Traf Sign (A) Each =================================================== ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 8.00 50.00 90.50 67.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 12.00 30.00 69.72 66.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 12.00 86.00 86.91 86.91 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 24.00 71.00 146.76 50.00 MTCER200-265 Pueblo 05/28/20 16.00 50.00 80.00 10.00 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 18.00 65.00 49.58 36.00 NH050A-037 US 50A Pueblo Regional Pond SHER400-373 R4 Signal Head Backplate Inst 05/28/20 50.00 70.00 66.25 50.00 IM025A-048 Northbound I-25 bridge at Exi 05/28/20 4.00 51.00 48.33 45.00 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 8.00 31.00 97.00 100.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 30.00 50.00 59.33 65.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 36.00 50.00 61.36 57.78 NHPPR100-251 SH 2/ Vasquez 06/25/20 66.00 60.00 47.15 45.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,044.00 50.20 57.22 43.26 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 64.00 50.00 75.94 72.00 STMM086-083 ADA PUEBLO METRO 07/09/20 20.00 50.00 53.00 36.00 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 20.00 50.00 88.26 93.50 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 57.00 50.00 29.00 12.00 MTCER300-258 MTCE R3 FY20 Region Roundabou 07/09/20 8.00 10.00 53.33 50.00 MTCER300-255 MTCE R3 FY20/21 Signal Replac 07/09/20 14.00 60.00 27.50 25.00 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 16.00 50.00 47.88 48.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 4.00 50.00 48.38 50.00 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 2.00 55.00 20.00 20.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 45.00 60.00 97.50 30.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 32.00 50.00 57.17 30.00 STR184B-006 CULVERTS SH 184 08/06/20 22.00 35.00 40.00 40.00 IM0252-498 I-25 Maintenance Region 2 Pue 08/19/20 36.00 5.54 5.54 5.54 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 16.00 55.00 22.01 30.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 84.00 50.00 50.00 15.00 SHER400-379 Signal Head Backplate Install 08/20/20 50.00 70.00 94.50 110.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 32.00 57.74 37.43 5.40 STM094A-038 SH94 WB PASSING LANE 09/01/20 19.00 60.98 60.98 60.98 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 98.00 45.00 86.67 68.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 79.00 50.00 96.58 68.91 MTCE0702-386 Grand Junction 09/03/20 34.00 80.00 30.00 65.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 28.00 70.00 75.14 50.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 38.00 35.00 30.58 35.20 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 38.00 22.00 36.69 67.45 SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 24.00 65.00 52.50 5.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 20.00 50.00 53.50 60.50 CR400-374 FY 20 Culvert Prioritization 09/17/20 8.00 50.00 27.25 24.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 186.00 60.00 65.17 65.17 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,094.00 51.43 61.91 50.15 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 600 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80341 Const Traf Sign (A) Each =================================================== MTCE0253-271 FY20 I-25 SIGN REPL PHASE 1 10/08/20 20.00 60.00 41.33 50.00 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 84.00 50.00 33.67 30.00 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 44.00 25.00 10.20 11.30 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 255.00 45.00 63.29 54.88 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 52.00 85.00 60.10 65.30 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 14.00 54.00 51.25 50.00 NHPP0702-407 PR I-70 Glenwood Springs Griz 11/03/20 9.00 60.00 13.17 12.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 71.00 60.00 41.20 31.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 12.00 80.00 60.15 50.00 C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 9.00 90.00 18.35 12.00 ITSITSB-002 ITS CV ROADSIDE UNITS 11/12/20 20.00 45.00 51.33 64.00 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 17.00 50.00 48.50 23.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 22.00 60.00 43.50 23.00 FSA1211-098 SH 121 & 1ST AVE 11/19/20 32.00 50.00 60.50 62.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 9.00 60.00 71.00 70.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 68.00 30.00 27.40 12.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 46.00 50.00 25.88 20.00 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 18.00 45.00 73.58 95.16 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 2.00 46.00 70.17 50.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 85.00 50.00 63.50 63.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 65.00 58.34 58.34 58.34 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 24.00 25.00 43.02 49.70 CR100-342 US-6 at Garrison 12/17/20 91.00 50.00 59.50 5.00 STA141A-051 This will be a chipseal proje 12/17/20 71.00 50.00 30.40 33.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 257.00 81.22 86.91 86.91 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,397.00 55.68 48.40 49.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,589.00 52.05 58.14 51.30 =============== 630-80342 Const Traf Sign (B) Each =================================================== STA0142-066 SH 14 New Raymer West 01/09/20 94.00 101.00 82.75 76.00 FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 27.00 100.00 90.70 200.00 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 8.00 65.00 65.33 65.00 SHER500-210 R5 FY19 CENTER LINE RUMBLE ST 01/09/20 26.00 30.00 88.13 26.25 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 30.00 65.00 90.00 90.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 81.00 65.00 103.41 113.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 12.00 75.00 157.45 250.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STA006A-067 SH 6 Merino to Atwood 01/16/20 106.00 90.00 57.00 58.00 STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 49.00 30.00 40.00 40.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 601 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80342 Const Traf Sign (B) Each =================================================== NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 27.00 55.00 64.01 63.01 STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 12.00 75.00 50.00 50.00 STR141A-044 SH 141 AND SH 145, FROM SLICK 01/30/20 62.00 40.00 33.93 31.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 76.00 110.00 227.50 250.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 46.00 100.00 71.29 105.99 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 30.00 70.00 112.09 246.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 19.00 50.00 110.80 80.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 98.00 65.00 93.50 87.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 28.00 40.00 32.71 34.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 37.00 60.00 88.17 72.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 42.00 55.00 43.89 35.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 89.00 40.00 53.18 55.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 47.00 71.00 138.38 16.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 62.00 60.00 18.30 31.60 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 103.00 72.00 86.45 85.55 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 33.00 20.00 52.00 51.00 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 57.00 30.00 40.00 40.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 8.00 35.00 35.00 35.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 94.00 40.00 52.40 70.20 NHPP0502-082 US 50 MONTROSE RE CHIP SEAL 03/05/20 177.00 60.00 35.00 30.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 66.00 75.00 62.53 68.27 STRR300-249 Grand and Jackson Counties AD 03/05/20 24.00 55.00 36.33 5.00 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 24.00 55.00 25.25 5.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 61.00 40.00 78.23 36.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 101.00 60.00 86.37 111.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 20.00 60.00 44.40 44.80 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 54.00 115.00 97.80 72.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,930.00 64.29 74.10 74.00 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 14.00 40.00 33.22 37.90 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 32.00 60.00 42.10 43.00 IM0761-226 I76/SH52 Interchange 04/02/20 140.00 50.00 114.37 84.80 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 28.00 55.00 26.83 5.00 MTCER300-259 MTCE R3 FY20/21 Region Wide S 04/02/20 15.00 10.00 52.50 5.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 64.00 70.00 59.73 60.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 51.00 73.00 38.95 38.89 SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 60.00 110.00 50.00 50.00 NHPP1601-077 US 160 MP 29.750 - MP 34.891 04/09/20 62.00 40.00 39.67 44.00 SFTY2254-091 225 Ramp Improvements 04/09/20 48.00 80.00 92.50 60.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 80.00 110.00 54.46 44.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 70.00 65.00 134.66 158.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 24.00 40.00 54.00 62.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 21.00 120.00 48.33 43.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 602 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80342 Const Traf Sign (B) Each =================================================== C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 12.00 25.00 67.00 80.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 32.00 85.00 140.33 80.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 33.00 75.00 137.08 210.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 32.00 55.00 202.25 248.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 99.00 40.00 80.23 77.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 24.00 96.00 97.77 97.77 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 56.00 115.00 165.55 75.00 MTCER200-265 Pueblo 05/28/20 26.00 60.00 80.00 10.00 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 12.00 43.00 57.69 36.00 NH050A-037 US 50A Pueblo Regional Pond SHER400-373 R4 Signal Head Backplate Inst 05/28/20 76.00 90.00 92.50 75.00 IM025A-048 Northbound I-25 bridge at Exi 05/28/20 28.00 84.00 61.58 60.00 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 32.00 40.00 109.50 125.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 8.00 65.00 59.33 65.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 34.00 60.00 76.16 57.79 NHPPR100-251 SH 2/ Vasquez 06/25/20 54.00 100.00 59.33 56.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,267.00 70.71 91.44 75.43 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 46.00 65.00 137.44 105.00 STMM086-083 ADA PUEBLO METRO 07/09/20 48.00 60.00 64.00 48.00 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 58.00 60.00 147.76 93.50 MTCER300-258 MTCE R3 FY20 Region Roundabou 07/09/20 18.00 10.00 53.33 50.00 MTCER300-255 MTCE R3 FY20/21 Signal Replac 07/09/20 32.00 60.00 30.00 35.00 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 44.00 80.00 89.88 90.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 44.00 80.00 75.38 75.00 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 10.00 60.00 30.00 30.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 61.00 75.00 145.00 70.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 32.00 75.00 73.83 65.00 STR184B-006 CULVERTS SH 184 08/06/20 8.00 50.00 40.00 40.00 IM0252-498 I-25 Maintenance Region 2 Pue 08/19/20 24.00 5.54 5.54 5.54 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 24.00 65.00 39.29 45.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 24.00 55.00 53.33 15.00 SHER400-379 Signal Head Backplate Install 08/20/20 76.00 90.00 94.50 110.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 48.00 67.50 41.55 5.40 STM094A-038 SH94 WB PASSING LANE 09/01/20 31.00 72.08 72.08 72.08 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 33.00 55.00 113.50 120.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 84.00 60.00 159.09 121.45 MTCE0702-386 Grand Junction 09/03/20 78.00 90.00 30.00 65.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 34.00 120.00 84.86 60.00 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 10.00 35.00 66.60 55.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 128.00 40.00 34.95 41.10 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 78.00 30.00 51.76 75.35 SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 60.00 85.00 52.50 5.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 48.00 70.00 64.27 71.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 603 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80342 Const Traf Sign (B) Each =================================================== CR400-374 FY 20 Culvert Prioritization 09/17/20 18.00 80.00 36.75 32.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 152.00 70.00 76.04 76.04 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,351.00 65.21 75.54 66.66 MPC040-061 R2 FY 21 Sign Replacement 10/01/20 30.00 61.50 62.50 60.00 MTCE0253-271 FY20 I-25 SIGN REPL PHASE 1 10/08/20 36.00 70.00 54.33 50.00 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 24.00 55.00 44.67 40.00 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 16.00 25.00 10.20 11.30 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 10.00 50.00 89.97 54.90 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 180.00 90.00 71.77 70.30 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 46.00 75.00 86.42 60.00 NHPP0702-407 PR I-70 Glenwood Springs Griz 11/03/20 26.00 70.00 13.17 12.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 10.00 70.00 53.20 52.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 64.00 85.00 67.60 50.00 C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 26.00 100.00 21.55 12.00 ITSITSB-002 ITS CV ROADSIDE UNITS 11/12/20 54.00 55.00 188.67 236.00 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 30.00 50.00 59.75 23.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 36.00 70.00 62.00 52.00 FSA1211-098 SH 121 & 1ST AVE 11/19/20 32.00 75.00 75.50 74.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 11.00 65.00 248.50 257.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 90.00 40.00 35.65 22.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 118.00 60.00 38.40 31.00 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 52.00 75.00 86.45 107.85 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 62.00 70.00 104.76 90.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 61.00 80.00 105.00 105.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 5.00 147.11 147.11 147.11 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 98.00 35.00 64.53 74.60 CR100-342 US-6 at Garrison 12/17/20 33.00 60.00 81.33 5.00 STA141A-051 This will be a chipseal proje 12/17/20 104.00 60.00 67.80 88.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 187.00 101.52 108.63 108.63 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,441.00 70.83 68.37 73.88 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,989.00 67.43 77.00 72.62 =============== 630-80343 Const Traf Sign (C) Each =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 8.00 140.00 92.44 200.00 SHER500-210 R5 FY19 CENTER LINE RUMBLE ST 01/09/20 4.00 35.00 88.13 26.25 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 32.00 70.00 115.48 124.00 STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 4.00 35.00 40.00 40.00 STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 2.00 85.00 65.00 65.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 604 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80343 Const Traf Sign (C) Each =================================================== STR141A-044 SH 141 AND SH 145, FROM SLICK 01/30/20 8.00 50.00 42.38 42.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 8.00 135.00 227.50 250.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 24.00 100.00 74.60 112.61 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 8.00 85.00 119.49 246.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 15.00 80.00 120.40 100.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 16.00 85.00 101.00 92.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 28.00 77.00 146.69 16.00 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 12.00 35.00 50.00 50.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 3.00 85.00 93.20 96.71 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 51.00 50.00 83.23 36.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 223.00 73.14 104.06 85.72 IM0761-226 I76/SH52 Interchange 04/02/20 8.00 60.00 127.26 106.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 48.00 75.00 72.40 80.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 8.00 90.00 55.78 55.56 SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 18.00 120.00 50.00 50.00 SFTY2254-091 225 Ramp Improvements 04/09/20 20.00 100.00 99.00 60.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 25.00 150.00 57.69 44.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 10.00 87.00 114.33 125.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 12.00 70.00 233.25 248.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 8.00 40.00 90.75 88.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 2.00 107.00 108.64 108.64 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 8.00 120.00 178.55 100.00 MTCER200-265 Pueblo 05/28/20 8.00 65.00 80.00 10.00 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 12.00 85.00 122.00 150.00 NHPPR100-251 SH 2/ Vasquez 06/25/20 8.00 100.00 70.98 67.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 195.00 93.61 93.64 85.66 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 2.00 85.00 121.81 55.00 STMM086-083 ADA PUEBLO METRO 07/09/20 3.00 70.00 79.50 59.00 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 8.00 70.00 156.08 93.50 MTCER300-255 MTCE R3 FY20/21 Signal Replac 07/09/20 8.00 60.00 40.00 45.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 12.00 85.00 172.50 70.00 IM0252-498 I-25 Maintenance Region 2 Pue 08/19/20 12.00 5.54 5.54 5.54 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 16.00 75.00 63.14 75.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 4.00 83.16 83.16 83.16 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 32.00 150.00 96.14 70.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 4.00 50.00 91.94 47.00 SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 18.00 80.00 52.50 5.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 605 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80343 Const Traf Sign (C) Each =================================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 2.00 80.00 86.91 86.91 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 121.00 87.93 89.55 53.93 MPC040-061 R2 FY 21 Sign Replacement 10/01/20 30.00 75.36 62.50 60.00 MTCE0253-271 FY20 I-25 SIGN REPL PHASE 1 10/08/20 8.00 85.00 66.00 50.00 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 16.00 90.00 83.43 75.30 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 20.00 80.00 77.25 70.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 4.00 80.00 74.87 82.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 48.00 90.00 72.42 50.00 ITSITSB-002 ITS CV ROADSIDE UNITS 11/12/20 8.00 70.00 160.67 236.00 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 6.00 80.00 81.50 53.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 45.00 70.00 248.50 257.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 16.00 40.00 50.40 45.00 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 4.00 100.00 94.79 107.85 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 26.00 83.00 129.30 120.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1.00 150.23 150.23 150.23 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 4.00 40.00 86.05 99.40 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 15.00 111.68 119.50 119.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 251.00 79.66 102.35 111.22 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 790.00 82.53 97.93 88.94 =============== 630-80344 Const Traf Sign (Spec) Sq Foot ================================================ NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 1,100.00 30.00 25.50 16.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 528.00 30.00 30.50 26.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 103.00 70.00 23.36 16.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 119.00 23.00 38.29 21.00 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 240.00 25.00 31.00 32.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 64.00 20.00 25.01 29.25 NHPP0502-082 US 50 MONTROSE RE CHIP SEAL 03/05/20 388.00 25.00 30.00 30.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 105.00 30.00 27.27 24.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 7.50 14.00 32.20 29.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,654.50 29.77 28.07 22.38 IM0761-226 I76/SH52 Interchange 04/02/20 612.00 20.00 21.67 14.84 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 96.00 30.00 29.69 35.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 606 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80344 Const Traf Sign (Spec) Sq Foot ================================================ NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 200.00 18.50 28.62 27.50 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 183.00 16.00 16.30 16.30 NH050A-035 US 50A Pueblo Regional Pond 05/28/20 330.00 25.00 19.04 16.25 NH050A-037 US 50A Pueblo Regional Pond -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,421.00 21.11 21.59 18.50 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 59.00 35.00 35.00 35.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 200.00 20.00 20.67 22.30 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 312.00 15.00 16.30 16.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 571.00 18.82 20.34 20.33 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 96.00 85.00 28.50 20.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 355.00 20.00 24.50 25.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 240.00 25.00 17.50 15.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 180.00 25.00 37.65 43.50 STA141A-051 This will be a chipseal proje 12/17/20 584.00 25.00 15.10 16.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1,000.00 15.23 16.30 16.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,455.00 22.64 20.51 19.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,101.50 24.69 23.27 20.44 =============== 630-80348 Const Info Sign Each =================================================== STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 2.00 216.00 152.78 200.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 2.00 220.00 2093.63 2050.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 218.00 1317.29 1125.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 2.00 500.00 246.63 285.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 500.00 246.63 285.00 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 2.00 300.00 900.67 352.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 300.00 900.67 352.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 309.00 703.84 721.75 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 607 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80350 Vert Panel Each =================================================== STA0142-066 SH 14 New Raymer West 01/09/20 20.00 30.00 33.38 25.51 FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 100.00 40.00 23.74 30.00 STA006A-067 SH 6 Merino to Atwood 01/16/20 40.00 30.00 16.90 17.00 STR141A-044 SH 141 AND SH 145, FROM SLICK 01/30/20 200.00 20.00 31.73 31.00 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 30.00 30.00 38.85 30.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 36.00 29.00 17.50 15.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 42.00 70.00 35.64 22.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 20.00 21.00 48.39 44.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 20.00 30.00 17.62 17.10 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 30.00 30.00 31.93 29.25 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 50.00 40.00 35.00 39.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 588.00 31.64 30.97 28.58 IM0761-226 I76/SH52 Interchange 04/02/20 40.00 35.00 42.26 31.80 NHPP1601-077 US 160 MP 29.750 - MP 34.891 04/09/20 30.00 27.00 22.67 20.00 SFTY2254-091 225 Ramp Improvements 04/09/20 100.00 40.00 36.00 24.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 25.00 30.00 26.67 28.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 50.00 40.00 33.00 31.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 50.00 21.00 21.72 21.72 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 295.00 33.93 34.37 25.79 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 60.00 35.00 47.88 48.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 60.00 40.00 45.88 45.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 30.00 40.00 31.33 12.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 50.00 30.00 40.98 42.30 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 40.00 22.00 24.36 61.85 CR400-374 FY 20 Culvert Prioritization 09/17/20 30.00 20.00 25.25 26.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 200.00 20.00 21.72 21.72 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 470.00 26.98 32.97 33.30 MPC040-061 R2 FY 21 Sign Replacement 10/01/20 120.00 27.86 25.00 20.00 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 150.00 25.00 47.28 26.83 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 30.00 25.00 26.58 25.00 ITSITSB-002 ITS CV ROADSIDE UNITS 11/12/20 30.00 30.00 41.67 41.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 608 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80350 Vert Panel Each =================================================== FSA1211-098 SH 121 & 1ST AVE 11/19/20 30.00 40.00 33.17 37.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 500.00 30.46 32.59 32.59 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 860.00 29.27 35.54 30.01 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,213.00 30.03 33.06 29.77 =============== 630-80351 Vert Panel (Plastic) Each =================================================== ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 30.00 32.00 1166.94 50.00 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 50.00 45.00 34.00 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 80.00 40.13 713.76 40.63 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 80.00 40.13 713.76 40.63 =============== 630-80353 Vert Panel (Light) (F) Each =================================================== FSA2873-194 US 287 Longmont Intersection 02/13/20 24.00 80.00 74.54 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 24.00 80.00 74.54 110.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 6.00 50.00 40.34 50.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 50.00 40.34 50.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 74.00 66.82 98.12 =============== 630-80354 Vert Panel (Light) (SB) Each =================================================== STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 20.00 45.00 59.88 60.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 20.00 45.00 59.13 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 40.00 45.00 59.50 60.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 45.00 59.50 60.00 =============== 630-80355 Port Mesg Panel Each =================================================== STA0142-066 SH 14 New Raymer West 01/09/20 2.00 3540.00 4828.00 5000.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 609 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80355 Port Mesg Panel Each =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 2.00 6500.00 4979.70 6000.00 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 2.00 2500.00 2701.67 2100.00 SHER500-210 R5 FY19 CENTER LINE RUMBLE ST 01/09/20 2.00 3000.00 6942.50 3885.00 FSA0341-097 US 34 & MACGREGOR INTERSECTIO 01/09/20 4.00 5000.00 7000.00 7000.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 6.00 6000.00 8004.97 6770.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 4.00 5000.00 9056.12 9800.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STA006A-067 SH 6 Merino to Atwood 01/16/20 3.00 3540.00 1640.01 3000.00 STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 2.00 5000.00 6250.00 5000.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 3.00 5000.00 8437.90 7875.79 STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 2.00 6000.00 4000.00 4000.00 STR141A-044 SH 141 AND SH 145, FROM SLICK 01/30/20 4.00 2000.00 7068.53 7500.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 4.00 6000.00 5250.00 6000.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 2.00 5000.00 6233.25 8611.50 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 2.00 5250.00 5804.00 3600.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 1.00 5000.00 5260.00 4000.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 2.00 5000.00 9075.00 6150.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 2.00 5500.00 6784.93 9000.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 2.00 4500.00 5464.17 3300.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 2.00 5100.00 8977.81 15000.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 3.00 5500.00 6492.62 8000.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 1.00 10000.00 12164.75 1600.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 2.00 4850.00 7436.63 7415.00 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 2.00 5000.00 6500.00 7500.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 3.00 4000.00 2200.00 2200.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 4.00 5500.00 10966.23 17550.00 NHPP0502-082 US 50 MONTROSE RE CHIP SEAL 03/05/20 10.00 5000.00 4873.75 4500.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 2.00 5100.00 6891.43 8532.57 STRR300-249 Grand and Jackson Counties AD 03/05/20 3.00 3000.00 5566.67 5000.00 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 3.00 3000.00 3162.50 5000.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 3.00 8000.00 10405.00 4200.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 4.00 5000.00 13728.49 9400.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 6.00 5000.00 8024.50 8399.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 8.00 6000.00 5834.00 6600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 107.00 4979.44 7109.24 6723.64 IM0761-226 I76/SH52 Interchange 04/02/20 4.00 5000.00 10208.64 6890.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 2.00 4000.00 3838.33 5000.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 2.00 5000.00 15266.09 7500.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 2.00 7000.00 4472.22 4444.44 SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 3.00 7000.00 9500.00 9500.00 NHPP1601-077 US 160 MP 29.750 - MP 34.891 04/09/20 2.00 2000.00 3666.67 3000.00 SFTY2254-091 225 Ramp Improvements 04/09/20 4.00 5000.00 7837.50 4375.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 3.00 6000.00 7295.05 4400.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 610 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80355 Port Mesg Panel Each =================================================== FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 1.00 4800.00 5003.83 3225.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 4.00 2500.00 4537.67 4300.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 3.00 2700.00 5447.67 4830.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 4.00 6500.00 5138.33 5000.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 2.00 5000.00 4632.12 5000.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 2.00 6420.00 6517.77 6517.77 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 2.00 7000.00 4182.00 3500.00 SHER400-373 R4 Signal Head Backplate Inst 05/28/20 8.00 5625.00 5863.50 4280.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 4.00 2750.00 4079.67 4539.00 NHPPR100-251 SH 2/ Vasquez 06/25/20 4.00 3500.00 2661.30 2548.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 56.00 4834.64 6453.01 4896.25 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 7.00 5000.00 4576.75 2100.00 STMM086-083 ADA PUEBLO METRO 07/09/20 3.00 5000.00 8210.00 4720.00 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 2.00 3000.00 4515.58 3850.00 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 2.00 6000.00 2275.00 1550.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 10.00 6000.00 4182.50 3865.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 2.00 5000.00 4596.67 2370.00 STR184B-006 CULVERTS SH 184 08/06/20 2.00 5000.00 2300.00 2300.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 4.00 8000.00 5714.29 3100.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 3.00 5000.00 3600.00 7500.00 SHER400-379 Signal Head Backplate Install 08/20/20 8.00 5625.00 6340.00 9680.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 4.00 6069.98 6328.36 4000.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 2.00 6098.44 6098.44 6098.44 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 4.00 5000.00 6150.00 8900.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 4.00 5000.00 6340.41 8977.06 MTCE0702-386 Grand Junction 09/03/20 2.00 5000.00 4833.33 4500.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 2.00 6000.00 6617.86 5000.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 4.00 5500.00 15725.52 17600.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 3.00 17000.00 3038.50 6629.50 SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 3.00 5500.00 10000.00 5000.00 CR400-374 FY 20 Culvert Prioritization 09/17/20 4.00 4000.00 1643.75 1700.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 6.00 5000.00 5431.47 5431.47 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 81.00 5851.57 6030.59 5720.65 MTCE0253-271 FY20 I-25 SIGN REPL PHASE 1 10/08/20 2.00 7000.00 2461.33 2500.00 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 4.00 3000.00 4483.33 4000.00 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 4.00 4000.00 1460.20 565.00 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 3.00 4500.00 6061.00 5183.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 611 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80355 Port Mesg Panel Each =================================================== NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 4.00 6000.00 10676.67 7030.00 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 2.00 5500.00 7532.67 2500.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 4.00 6500.00 8913.33 10000.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 2.00 5000.00 9027.91 4500.00 ITSITSB-002 ITS CV ROADSIDE UNITS 11/12/20 2.00 4000.00 8492.33 2500.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 4.00 4000.00 3595.00 2280.00 FSA1211-098 SH 121 & 1ST AVE 11/19/20 4.00 5000.00 2280.00 1730.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 9.00 5500.00 16135.50 16971.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 4.00 5500.00 6194.98 8000.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 2.00 5500.00 10538.20 9800.00 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 8.00 5000.00 6836.50 8247.12 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 2.00 6000.00 9085.46 8500.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 6.00 5000.00 5225.00 5250.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 2.00 9015.15 9015.15 9015.15 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 4.00 20000.00 9891.67 12450.00 STA141A-051 This will be a chipseal proje 12/17/20 4.00 5000.00 3557.00 3035.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 2.00 8121.83 8690.36 8690.36 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 78.00 6016.33 6945.42 7155.59 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 322.00 5424.82 6667.50 6258.16 =============== 630-80356 Flash Arrow Panel (A Ty) Each =================================================== FSA2873-194 US 287 Longmont Intersection 02/13/20 2.00 3000.00 1601.67 880.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 2.00 800.00 2760.03 1530.09 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 1900.00 1987.79 1205.05 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 6.00 1000.00 1512.50 1525.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 2.00 1000.00 1890.00 1185.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 1000.00 1638.33 1440.00 MTCE0253-271 FY20 I-25 SIGN REPL PHASE 1 10/08/20 2.00 1200.00 590.33 800.00 FSA1211-098 SH 121 & 1ST AVE 11/19/20 2.00 2500.00 1269.00 741.00 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 2.00 1000.00 1321.00 1268.79 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 1566.67 1060.11 936.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18.00 1388.89 1562.08 1219.99 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 612 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80357 Flash Arrow Panel (B Ty) Each =================================================== C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 2.00 900.00 2290.00 1580.00 STRR300-249 Grand and Jackson Counties AD 03/05/20 3.00 1000.00 1066.67 50.00 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 3.00 1000.00 587.50 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 975.00 1032.40 488.75 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 2.00 1000.00 360.67 2.00 C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 3.00 1320.00 1098.55 620.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 4.00 700.00 943.33 965.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 2.00 1000.00 1027.30 1386.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 11.00 978.18 909.30 772.45 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 1.00 1000.00 882.50 1000.00 STMM086-083 ADA PUEBLO METRO 07/09/20 3.00 900.00 877.50 1180.00 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 2.00 2000.00 1984.00 1650.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 3.00 1000.00 400.00 200.00 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 6.00 2500.00 2075.00 1650.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 2.00 5000.00 967.71 2273.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 2.00 1200.00 741.67 550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 19.00 2005.26 1481.62 1262.42 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 4.00 1000.00 590.00 500.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 2.00 1500.00 1320.00 285.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 2.00 1000.00 4235.00 4400.00 CR100-342 US-6 at Garrison 12/17/20 8.00 1300.00 1304.17 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 16.00 1212.50 1349.72 735.63 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 54.00 1408.52 1292.01 891.91 =============== 630-80358 Flash Arrow Panel (C Ty) Each =================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 2.00 1800.00 1807.24 1800.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 613 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80358 Flash Arrow Panel (C Ty) Each =================================================== NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 2.00 735.00 803.33 735.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 4.00 1200.00 1781.94 1805.00 STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 2.00 800.00 660.00 660.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 3.00 1800.00 1750.00 2000.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 2.00 2000.00 1912.37 2384.73 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 1.00 1500.00 1462.60 1200.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 2.00 2000.00 1140.00 500.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 1.00 3000.00 4136.25 525.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 4.00 1200.00 2869.86 2850.00 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 2.00 2000.00 1500.00 1500.00 NHPP0502-082 US 50 MONTROSE RE CHIP SEAL 03/05/20 2.00 1500.00 1703.75 1700.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 2.00 1500.00 1607.52 1137.68 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 2.00 1000.00 2478.33 1800.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 10.00 1600.00 2224.62 2325.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 2.00 1600.00 1635.00 1680.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 2.00 1500.00 2708.00 3300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 45.00 1519.33 2045.63 1866.44 IM0761-226 I76/SH52 Interchange 04/02/20 2.00 1900.00 2072.87 2120.00 MTCER300-259 MTCE R3 FY20/21 Region Wide S 04/02/20 2.00 300.00 762.50 775.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 2.00 3000.00 1191.94 2500.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 1.00 2500.00 894.45 888.89 SFTY2254-091 225 Ramp Improvements 04/09/20 4.00 1750.00 3591.50 883.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 2.00 1600.00 3555.62 2200.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 1.00 2000.00 2653.67 1610.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 2.00 1500.00 669.38 570.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 4.00 1800.00 1746.67 2110.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 2.00 2250.00 3466.75 3013.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 2.00 1500.00 3111.67 3500.00 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 1.00 2600.00 5930.35 2500.00 MTCER200-265 Pueblo 05/28/20 2.00 150.00 402.50 100.00 SHER400-373 R4 Signal Head Backplate Inst 05/28/20 4.00 1350.00 4387.50 4815.00 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 2.00 1500.00 1607.50 2500.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 2.00 1000.00 1748.33 1945.00 NHPPR100-251 SH 2/ Vasquez 06/25/20 3.00 1200.00 709.83 679.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 38.00 1571.05 2270.17 2018.84 MTCER300-255 MTCE R3 FY20/21 Signal Replac 07/09/20 2.00 800.00 837.50 1500.00 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 2.00 2000.00 600.00 600.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 614 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80358 Flash Arrow Panel (C Ty) Each =================================================== STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 2.00 2000.00 590.00 600.00 IM0252-498 I-25 Maintenance Region 2 Pue 08/19/20 4.00 216.01 216.01 216.01 SHER400-379 Signal Head Backplate Install 08/20/20 4.00 4000.00 1325.00 1650.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 6.00 2000.00 2229.35 1646.73 MTCE0702-386 Grand Junction 09/03/20 2.00 500.00 1166.67 1500.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 2.00 2000.00 1412.14 1000.00 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 1.00 1500.00 1837.00 1650.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 8.00 1200.00 1303.55 1303.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 33.00 1653.46 1496.57 1206.75 MPC040-061 R2 FY 21 Sign Replacement 10/01/20 3.00 1311.95 1350.00 1200.00 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 6.00 2500.00 1636.67 1760.00 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 2.00 1400.00 1185.33 120.00 NHPP0702-407 PR I-70 Glenwood Springs Griz 11/03/20 1.00 1500.00 329.31 300.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 2.00 2000.00 2760.00 1600.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 2.00 3000.00 6628.59 3500.00 C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 1.00 1500.00 1794.81 585.00 ITSITSB-002 ITS CV ROADSIDE UNITS 11/12/20 2.00 2000.00 3179.33 1725.00 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 2.00 1500.00 1476.25 1100.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 2.00 1500.00 1225.00 2000.00 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 2.00 1378.00 1731.52 1100.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 4.00 2000.00 1997.50 1995.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 2.00 2068.19 2068.19 2068.19 STA141A-051 This will be a chipseal proje 12/17/20 2.00 2000.00 552.00 300.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 4.00 45.69 48.89 48.89 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 37.00 1724.62 1794.86 1358.03 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 153.00 1610.75 1955.74 1639.06 =============== 630-80359 Port Mesg Panel Day ==================================================== NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 1,025.00 40.00 39.87 30.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,025.00 40.00 39.87 30.60 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 146.00 55.00 70.69 59.56 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 204.00 100.00 75.50 45.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 65.00 85.00 115.13 175.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 615 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80359 Port Mesg Panel Day ==================================================== ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 26.00 200.00 135.00 121.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 80.00 100.00 133.00 137.50 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 10.00 3600.00 1050.00 2000.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 40.00 90.00 123.05 98.23 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 571.00 151.94 110.47 117.91 MTCER300-255 MTCE R3 FY20/21 Signal Replac 07/09/20 150.00 50.00 62.50 50.00 IM0252-498 I-25 Maintenance Region 2 Pue 08/19/20 12.00 166.16 166.16 166.16 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 40.00 90.00 94.23 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 202.00 64.82 69.40 68.78 NHPP0702-407 PR I-70 Glenwood Springs Griz 11/03/20 100.00 80.00 46.10 42.00 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 50.00 80.00 152.00 201.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 5.00 53.04 53.04 53.04 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 155.00 79.13 88.11 93.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,953.00 78.40 69.06 65.08 =============== 630-80360 Drum Channel Dev Each =================================================== STA0142-066 SH 14 New Raymer West 01/09/20 170.00 40.00 30.75 21.00 FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 100.00 42.00 42.11 60.00 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 25.00 40.00 26.17 21.00 SHER500-210 R5 FY19 CENTER LINE RUMBLE ST 01/09/20 20.00 10.00 43.00 21.00 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 491.00 35.00 50.41 45.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 100.00 40.00 33.21 30.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STA006A-067 SH 6 Merino to Atwood 01/16/20 170.00 40.00 22.45 22.50 STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 100.00 25.00 30.00 30.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 400.00 30.00 46.13 47.25 STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 100.00 30.00 40.00 40.00 STR141A-044 SH 141 AND SH 145, FROM SLICK 01/30/20 100.00 25.00 31.93 31.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 100.00 45.00 45.00 50.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 275.00 45.00 25.44 26.50 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 50.00 35.00 38.96 66.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 50.00 40.00 47.80 40.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 50.00 40.00 22.00 22.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 616 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80360 Drum Channel Dev Each =================================================== STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 150.00 20.00 32.58 35.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 4.00 50.00 73.14 62.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 40.00 29.00 35.70 45.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 100.00 20.00 41.09 40.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 40.00 30.00 26.11 16.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 50.00 30.00 65.80 31.60 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 104.00 26.00 23.83 22.80 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 505.00 15.00 28.92 20.40 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 50.00 25.00 40.00 40.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 25.00 45.00 25.00 25.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 200.00 20.00 37.82 46.80 NHPP0502-082 US 50 MONTROSE RE CHIP SEAL 03/05/20 70.00 25.00 11.00 10.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 100.00 30.00 43.47 45.51 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 350.00 35.00 37.23 36.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 160.00 30.00 57.54 72.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 150.00 32.00 21.80 22.40 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 80.00 50.00 43.40 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,479.00 31.06 38.20 36.00 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 42.00 22.00 27.56 21.66 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 100.00 25.00 27.75 32.00 IM0761-226 I76/SH52 Interchange 04/02/20 200.00 35.00 49.26 42.40 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 70.00 20.00 27.67 40.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 500.00 15.00 29.91 20.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 335.00 40.00 11.56 11.11 SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 150.00 45.00 15.00 15.00 NHPP1601-077 US 160 MP 29.750 - MP 34.891 04/09/20 35.00 27.00 24.00 22.00 SFTY2254-091 225 Ramp Improvements 04/09/20 50.00 30.00 34.00 24.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 500.00 40.00 42.51 33.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 120.00 35.00 31.17 37.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 75.00 20.00 35.00 35.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 50.00 40.00 28.00 32.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 200.00 38.00 48.31 51.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 50.00 45.00 38.67 19.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 50.00 40.00 49.83 55.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 50.00 35.00 59.00 67.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 300.00 30.00 32.28 25.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 50.00 43.00 43.45 43.45 MTCER200-265 Pueblo 05/28/20 120.00 30.00 12.50 5.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 40.00 40.00 42.00 46.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 50.00 30.00 42.49 40.44 NHPPR100-251 SH 2/ Vasquez 06/25/20 150.00 40.00 47.15 45.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,287.00 32.57 37.84 29.41 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 617 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80360 Drum Channel Dev Each =================================================== C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 50.00 30.00 26.88 6.00 STMM086-083 ADA PUEBLO METRO 07/09/20 100.00 30.00 46.00 12.00 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 10.00 50.00 54.00 38.50 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 10.00 35.00 59.88 60.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 30.00 35.00 48.38 50.00 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 25.00 35.00 20.00 20.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 220.00 35.00 43.50 27.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 50.00 40.00 29.50 12.00 STR184B-006 CULVERTS SH 184 08/06/20 12.00 30.00 11.75 11.75 IM0252-498 I-25 Maintenance Region 2 Pue 08/19/20 480.00 2.22 2.22 2.22 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 80.00 30.00 28.00 30.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 100.00 31.75 17.80 8.20 STM094A-038 SH94 WB PASSING LANE 09/01/20 200.00 44.35 44.35 44.35 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 200.00 40.00 49.00 44.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 400.00 40.00 52.20 44.23 MTCE0702-386 Grand Junction 09/03/20 50.00 40.00 30.00 25.00 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 50.00 30.00 59.20 65.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 200.00 20.00 34.95 41.10 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 100.00 22.00 15.17 28.10 SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 150.00 40.00 30.00 35.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 50.00 30.00 48.07 55.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 100.00 35.00 38.02 38.02 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,667.00 29.08 36.84 29.30 MPC040-061 R2 FY 21 Sign Replacement 10/01/20 4.00 32.40 37.50 10.00 MTCE0253-271 FY20 I-25 SIGN REPL PHASE 1 10/08/20 80.00 40.00 23.67 25.00 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 20.00 40.00 23.00 20.00 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 120.00 30.00 9.80 11.30 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 200.00 25.00 49.23 42.69 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 150.00 35.00 27.70 20.10 NHPP0702-407 PR I-70 Glenwood Springs Griz 11/03/20 130.00 30.00 13.17 12.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 150.00 25.00 30.00 25.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 500.00 15.00 42.63 30.00 C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 20.00 40.00 21.51 17.50 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 150.00 40.00 34.25 26.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 40.00 40.00 31.88 35.00 FSA1211-098 SH 121 & 1ST AVE 11/19/20 50.00 40.00 42.50 37.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 125.00 35.00 71.00 70.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 50.00 30.00 35.60 33.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 25.00 30.00 26.58 20.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 618 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80360 Drum Channel Dev Each =================================================== IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 250.00 28.00 41.30 38.06 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 100.00 40.00 33.39 26.55 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 100.00 40.00 30.00 30.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 5.00 37.12 37.12 37.12 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 400.00 30.00 32.43 37.30 CR100-342 US-6 at Garrison 12/17/20 400.00 40.00 40.29 20.00 STA141A-051 This will be a chipseal proje 12/17/20 15.00 25.00 22.10 5.50 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 300.00 45.69 48.89 48.89 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,384.00 31.74 35.59 31.64 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13,817.00 31.21 37.20 32.07 =============== 630-80363 Drum Channel Dev (Light) (F) Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 50.00 42.00 62.78 62.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 20.00 45.00 43.43 35.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 20.00 30.00 30.00 30.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 6.00 55.00 37.90 33.12 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 40.00 35.00 31.63 16.00 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 20.00 30.00 60.00 60.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 50.00 60.00 39.23 36.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 50.00 45.00 23.33 23.55 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 9.00 50.00 73.80 72.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 265.00 43.89 43.19 37.98 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 10.00 40.00 38.22 37.90 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 10.00 30.00 41.58 53.75 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 20.00 30.00 43.81 60.00 SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 150.00 65.00 20.00 20.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 12.00 65.00 46.40 33.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 100.00 43.00 72.31 62.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 50.00 50.00 50.33 32.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 10.00 50.00 66.01 55.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 100.00 20.00 33.30 26.00 MTCER200-265 Pueblo 05/28/20 120.00 40.00 20.00 5.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 25.00 50.00 51.45 46.24 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 607.00 44.78 47.52 30.01 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 30.00 47.52 22.41 10.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 619 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80363 Drum Channel Dev (Light) (F) Each =================================================== C R100-288 R1 CURB RAMPS - PH 2 09/03/20 8.00 55.00 63.33 87.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 100.00 75.00 55.86 31.00 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 5.00 35.00 62.20 65.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 10.00 45.00 36.99 28.10 SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 150.00 65.00 32.50 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 303.00 65.15 44.40 32.84 MPC040-061 R2 FY 21 Sign Replacement 10/01/20 1.00 42.78 37.50 10.00 MTCE0253-271 FY20 I-25 SIGN REPL PHASE 1 10/08/20 40.00 50.00 31.33 25.00 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 80.00 35.00 37.37 25.10 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 50.00 40.00 50.25 35.00 NHPP0702-407 PR I-70 Glenwood Springs Griz 11/03/20 40.00 35.00 13.17 12.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 20.00 30.00 45.00 50.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 20.00 20.00 61.07 30.00 C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 20.00 50.00 22.71 17.50 ITSITSB-002 ITS CV ROADSIDE UNITS 11/12/20 50.00 50.00 56.33 64.00 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 6.00 45.00 48.75 26.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 20.00 50.00 47.20 50.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 15.00 35.00 46.26 40.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 5.00 66.29 66.29 66.29 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 30.00 35.00 64.37 74.60 CR100-342 US-6 at Garrison 12/17/20 20.00 45.00 55.33 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 417.00 40.33 44.96 36.27 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,592.00 47.34 45.56 33.52 =============== 630-80364 Drum Channel Dev (Light) (SB) Each =================================================== BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 40.00 45.00 54.25 40.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 20.00 30.00 30.00 30.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 200.00 40.00 58.88 57.76 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 20.00 30.00 60.00 60.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 12.00 45.00 40.00 40.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 100.00 40.00 48.10 56.89 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 50.00 60.00 39.23 36.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 100.00 45.00 23.33 23.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 542.00 42.51 47.63 46.63 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 25.00 30.00 41.58 53.75 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 620 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80364 Drum Channel Dev (Light) (SB) Each =================================================== STR0341-101 SH 34 North of Grandby Resurf 04/02/20 40.00 30.00 43.81 60.00 SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 150.00 45.00 20.00 20.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 10.00 30.00 47.67 41.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 20.00 50.00 71.66 55.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 100.00 42.00 33.30 26.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 25.00 59.00 59.75 59.75 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 25.00 35.00 51.45 46.24 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 395.00 41.90 43.46 34.19 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 20.00 35.00 43.31 30.00 STMM086-083 ADA PUEBLO METRO 07/09/20 25.00 35.00 48.50 12.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 100.00 55.44 55.44 55.44 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 5.00 35.00 60.20 55.00 SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 150.00 45.00 40.00 50.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 25.00 35.00 56.94 66.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 50.00 50.00 54.31 54.31 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 375.00 46.45 46.95 49.56 MPC040-061 R2 FY 21 Sign Replacement 10/01/20 4.00 17.94 37.50 10.00 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 20.00 50.00 23.00 20.00 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 24.00 35.00 9.40 11.30 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 80.00 40.00 37.37 25.10 NHPP0702-407 PR I-70 Glenwood Springs Griz 11/03/20 40.00 35.00 13.17 12.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 10.00 35.00 45.00 50.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 40.00 20.00 46.39 30.00 C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 20.00 50.00 22.71 17.50 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 50.00 50.00 83.50 82.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 20.00 42.00 48.20 55.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 15.00 35.00 46.26 40.00 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 50.00 45.00 48.74 44.41 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 30.00 35.00 64.53 74.60 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 200.00 55.84 59.75 59.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 603.00 44.77 43.71 45.54 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,915.00 43.87 45.46 44.29 =============== 630-80367 Port Traf Speed Monitor Each =================================================== BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 4.00 4000.00 2361.89 1600.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 621 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80367 Port Traf Speed Monitor Each =================================================== FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 2.00 2500.00 3000.00 2500.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 2.00 4200.00 4495.20 3990.40 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 1.00 3000.00 4136.25 525.00 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 2.00 3000.00 5250.00 5500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11.00 3490.91 3105.28 2809.62 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 2.00 2000.00 2977.58 6500.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 2.00 3000.00 2986.89 4000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 2500.00 2984.03 5250.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 2.00 3000.00 3258.89 3258.89 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 3000.00 3258.89 3258.89 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 2.00 2000.00 3201.33 804.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 2.00 5000.00 3853.11 1500.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 4.00 3000.00 2711.99 4000.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 2.00 5076.14 5431.47 5431.47 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 3615.23 3159.69 3147.09 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 27.00 3353.79 3095.52 3329.43 =============== 630-80368 Port Traf Speed Monitor Day ==================================================== NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 920.00 15.00 16.30 18.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 920.00 15.00 16.30 18.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 920.00 15.00 16.30 18.60 =============== 630-80370 Barrier (Temp) Lin Foot =============================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 1,500.00 45.00 30.67 30.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 622 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80370 Barrier (Temp) Lin Foot =============================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 500.00 30.00 53.67 70.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 4,165.00 40.00 38.01 32.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 2,440.00 10.00 19.00 22.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 1,100.00 36.00 35.38 38.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 150.00 70.00 106.53 75.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 200.00 70.00 73.00 73.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 4,000.00 42.00 42.62 56.95 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 2,000.00 50.00 72.67 35.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 21,950.00 35.00 38.23 27.57 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 100.00 45.00 82.55 72.80 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 750.00 45.00 51.40 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 38,855.00 36.34 38.92 32.91 IM0761-226 I76/SH52 Interchange 04/02/20 4,000.00 40.00 31.66 35.00 SFTY2254-091 225 Ramp Improvements 04/09/20 5,300.00 35.00 36.50 31.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 4,300.00 45.00 32.12 33.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 1,780.00 40.00 74.33 62.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 3,833.00 40.00 32.20 21.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 679.00 40.00 45.22 31.50 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 9,280.00 22.80 22.63 22.63 NHPPR100-251 SH 2/ Vasquez 06/25/20 120.00 35.00 71.33 74.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 29,292.00 34.36 34.23 29.95 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 240.00 50.00 59.38 55.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 5,304.00 34.18 34.18 34.18 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 200.00 40.00 64.80 120.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 1,000.00 40.00 43.33 35.50 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 500.00 55.00 70.50 78.75 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 18,850.00 21.06 20.68 20.68 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 26,094.00 25.51 33.33 26.18 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 200.00 40.00 42.62 67.86 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 3,750.00 70.00 73.33 50.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 1,000.00 75.00 70.48 78.60 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 623 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80370 Barrier (Temp) Lin Foot =============================================== NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 250.00 40.00 39.75 42.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 70.00 40.00 110.00 40.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 7,890.00 29.88 29.88 29.88 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 3,360.00 33.00 49.15 13.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 70,000.00 44.91 49.55 49.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 86,520.00 44.48 50.97 46.70 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 180,761.00 38.35 40.03 38.06 =============== 630-80371 Reset Concrete Barrier (Temp) Lin Foot =============================================== STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 2,400.00 15.00 7.36 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,400.00 15.00 7.36 9.00 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 240.00 20.00 11.50 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 240.00 20.00 11.50 5.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 959.00 25.00 22.06 17.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 959.00 25.00 22.06 17.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,599.00 18.00 14.55 11.00 =============== 630-80372 Conc Barrier (Temp) (Furnish & Install) Lin Foot =============================================== SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1,300.00 45.00 42.93 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,300.00 45.00 42.93 40.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,300.00 45.00 42.93 40.00 =============== 630-80377 Port Water Filled Barrier (Temp) Lin Foot =============================================== NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 120.00 100.00 81.57 162.43 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 624 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80377 Port Water Filled Barrier (Temp) Lin Foot =============================================== STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 80.00 50.00 71.67 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 200.00 80.00 77.61 157.46 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 200.00 80.00 77.61 157.46 =============== 630-80378 Glare Screen (Temp) Lin Foot =============================================== BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 1,000.00 15.00 19.62 22.72 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,000.00 15.00 19.62 22.72 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 29,500.00 18.17 20.28 20.28 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 29,500.00 18.17 20.28 20.28 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30,500.00 18.07 20.15 20.36 =============== 630-80380 Traffic Cone Each =================================================== STA0142-066 SH 14 New Raymer West 01/09/20 150.00 10.00 10.80 10.20 FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 500.00 12.00 11.82 15.00 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 50.00 11.00 10.00 9.00 SHER500-210 R5 FY19 CENTER LINE RUMBLE ST 01/09/20 150.00 2.00 24.60 4.20 NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 50.00 9.00 15.07 15.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 200.00 10.00 10.97 9.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC STA006A-067 SH 6 Merino to Atwood 01/16/20 300.00 10.00 8.98 9.00 STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 100.00 3.00 5.00 5.00 NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 350.00 8.00 14.35 14.70 STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 100.00 10.00 10.00 10.00 STR141A-044 SH 141 AND SH 145, FROM SLICK 01/30/20 300.00 10.00 2.03 1.05 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 100.00 12.00 15.25 17.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 100.00 12.00 10.29 13.25 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 150.00 10.00 12.76 16.50 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 400.00 10.00 10.50 10.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 350.00 10.00 1.39 2.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 450.00 6.00 5.22 2.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 200.00 10.00 2.40 3.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 100.00 6.00 6.40 6.00 C0402-094 US 40 GRAND COUNTY SIGNAL REP 02/27/20 200.00 10.00 5.75 10.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 625 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80380 Traffic Cone Each =================================================== NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 500.00 7.50 11.75 11.40 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 310.00 5.00 5.42 1.02 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 200.00 3.00 3.00 5.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 300.00 2.00 2.00 2.00 STR2871-038 US 287 Passing Lanes Springfi 03/05/20 200.00 10.00 3.48 2.34 NHPP0502-082 US 50 MONTROSE RE CHIP SEAL 03/05/20 1,000.00 8.00 19.50 20.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 100.00 9.00 11.78 11.38 STRR300-249 Grand and Jackson Counties AD 03/05/20 150.00 6.00 5.37 1.00 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 150.00 10.00 3.06 5.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 200.00 10.00 12.63 12.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 400.00 8.00 10.90 11.20 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 50.00 20.00 17.20 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7,860.00 8.35 10.40 9.45 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 264.00 5.00 6.55 5.41 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 400.00 8.00 6.53 1.25 IM0761-226 I76/SH52 Interchange 04/02/20 100.00 8.00 10.30 13.78 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 70.00 8.00 3.92 1.00 MTCER300-259 MTCE R3 FY20/21 Region Wide S 04/02/20 300.00 5.00 7.50 5.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 300.00 10.00 8.18 1.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 169.00 10.00 5.78 5.56 SFTY2254-091 225 Ramp Improvements 04/09/20 150.00 10.00 17.50 12.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 100.00 12.00 11.61 11.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 150.00 10.00 11.90 13.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 300.00 5.00 10.33 4.00 FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 25.00 10.00 10.33 5.00 C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 50.00 10.00 9.22 5.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 100.00 10.00 18.00 12.00 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 50.00 10.00 13.05 14.00 ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 200.00 10.00 17.13 17.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 400.00 3.00 17.68 22.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 50.00 14.00 13.03 13.03 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 150.00 12.00 20.63 20.00 MTCER200-265 Pueblo 05/28/20 200.00 9.00 7.63 5.00 SHER400-373 R4 Signal Head Backplate Inst 05/28/20 80.00 15.00 30.50 50.00 IM025A-048 Northbound I-25 bridge at Exi 05/28/20 100.00 10.00 6.29 6.00 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 200.00 5.00 18.00 25.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 60.00 10.00 14.17 15.50 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 50.00 10.00 18.51 11.56 NHPPR100-251 SH 2/ Vasquez 06/25/20 350.00 10.00 11.68 11.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4,368.00 8.09 11.95 10.62 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 100.00 8.00 10.50 6.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 626 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80380 Traffic Cone Each =================================================== STMM086-083 ADA PUEBLO METRO 07/09/20 100.00 10.00 17.50 15.00 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 100.00 20.00 18.65 13.20 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 75.00 8.20 5.38 1.15 MTCER300-258 MTCE R3 FY20 Region Roundabou 07/09/20 80.00 5.00 8.33 10.00 MTCER300-255 MTCE R3 FY20/21 Signal Replac 07/09/20 250.00 9.00 6.75 20.00 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 100.00 10.00 9.00 6.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 75.00 10.00 8.88 6.00 NHPP1602-152 US 160 N-10-V SOUTH FORK SCOU 07/23/20 25.00 10.00 3.00 3.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 100.00 9.50 15.50 6.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 50.00 15.00 12.40 12.00 STR184B-006 CULVERTS SH 184 08/06/20 40.00 5.00 2.50 2.50 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 100.00 10.00 2.57 3.50 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 150.00 6.00 7.00 1.00 SHER400-379 Signal Head Backplate Install 08/20/20 80.00 25.00 9.60 13.20 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 200.00 10.20 3.69 1.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 200.00 11.09 11.09 11.09 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 400.00 10.00 22.50 10.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 400.00 12.00 24.34 14.68 MTCE0702-386 Grand Junction 09/03/20 100.00 10.00 8.33 10.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 150.00 12.00 9.00 10.00 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 50.00 10.00 17.80 25.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 200.00 10.00 3.16 3.50 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 500.00 5.00 5.31 10.10 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 50.00 15.00 12.23 11.00 CR400-374 FY 20 Culvert Prioritization 09/17/20 60.00 9.50 10.38 6.50 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 200.00 10.00 10.86 10.86 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,935.00 9.92 11.20 9.71 MPC040-061 R2 FY 21 Sign Replacement 10/01/20 300.00 5.30 8.50 5.00 MTCE0253-271 FY20 I-25 SIGN REPL PHASE 1 10/08/20 120.00 10.00 15.33 5.00 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 150.00 6.00 11.33 10.00 CC080-030 GRAND JUNCTION RE VARIOUS CUL 10/22/20 150.00 10.00 4.85 5.65 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 50.00 10.00 15.81 2.44 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 200.00 10.00 12.83 5.00 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 150.00 10.00 10.97 7.50 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 300.00 15.00 7.67 1.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 1,000.00 10.00 9.44 15.00 C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 100.00 10.00 12.95 12.00 ITSITSB-002 ITS CV ROADSIDE UNITS 11/12/20 150.00 20.00 15.67 16.00 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 100.00 10.00 8.75 6.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 75.00 10.00 10.75 4.00 FSA1211-098 SH 121 & 1ST AVE 11/19/20 50.00 15.00 8.40 6.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 20.00 10.00 21.00 17.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 200.00 3.00 9.35 10.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 627 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80380 Traffic Cone Each =================================================== C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 120.00 8.00 1.94 1.00 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 200.00 9.00 13.52 15.23 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 200.00 10.00 25.21 21.25 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 100.00 20.00 8.75 9.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 5.00 18.03 18.03 18.03 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 150.00 3.00 17.63 18.60 CR100-342 US-6 at Garrison 12/17/20 400.00 10.00 10.17 1.00 STA141A-051 This will be a chipseal proje 12/17/20 320.00 8.00 1.11 1.10 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 500.00 12.18 13.03 13.03 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5,110.00 9.97 10.08 9.31 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21,273.00 8.97 10.81 9.70 =============== 630-80384 Tubular Marker Each =================================================== C0853-112 US85 & WCR98 INTERSECTION IMP 05/07/20 20.00 10.00 25.66 28.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20.00 10.00 25.66 28.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 10.00 25.66 28.00 =============== 630-80390 Channel Dev (Spec) Each =================================================== NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 150.00 20.00 26.75 26.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 150.00 20.00 26.75 26.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 150.00 20.00 26.75 26.00 =============== 630-80392 Stackable Tubular Marker Each =================================================== NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 50.00 20.00 40.00 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 50.00 20.00 40.00 45.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 20.00 40.00 45.00 =============== 630-80393 Stackable Vertical Panels Each =================================================== BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 32.00 35.00 31.62 11.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 628 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80393 Stackable Vertical Panels Each =================================================== FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 200.00 25.00 40.00 45.00 STRR300-249 Grand and Jackson Counties AD 03/05/20 60.00 15.00 40.00 50.00 CC080-037 VARIOUS ADA RAMPS ALONG NORTH 03/05/20 60.00 40.00 24.38 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 352.00 26.76 34.70 43.61 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 26.00 35.00 27.89 27.78 FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 16.00 35.00 49.49 50.00 SHER400-373 R4 Signal Head Backplate Inst 05/28/20 40.00 25.00 41.50 50.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 25.00 35.00 37.98 28.88 NHPPR100-251 SH 2/ Vasquez 06/25/20 75.00 25.00 35.50 34.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 182.00 28.68 39.87 37.33 STMM086-083 ADA PUEBLO METRO 07/09/20 40.00 27.00 39.00 30.00 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 100.00 30.00 43.42 42.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 100.00 40.00 33.00 6.00 CC080-038 VARIOUS ADA RAMPS THROUGHOUT 08/20/20 120.00 50.00 36.67 50.00 SHER400-379 Signal Head Backplate Install 08/20/20 40.00 40.00 35.25 49.50 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 40.00 200.00 68.67 23.00 C088A-036 R1 ADA CURB RAMPS - 088A, 075 09/03/20 400.00 75.00 80.15 44.23 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 50.00 30.00 37.57 31.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 25.00 30.00 46.46 49.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 915.00 61.13 61.53 38.67 STRM331-008 ADA RAMPS WALSENBURG 10/15/20 80.00 15.00 19.67 15.00 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 30.00 25.00 32.00 26.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 50.00 40.00 22.63 23.00 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 50.00 40.00 32.07 44.41 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 200.00 37.00 42.09 42.50 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 50.00 40.00 30.00 30.00 CR100-342 US-6 at Garrison 12/17/20 400.00 35.00 58.54 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 860.00 34.13 48.99 27.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,309.00 43.27 52.25 35.03 =============== 630-80401 Delin (Ty I) (Temp) Each =================================================== BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 20.00 50.00 29.96 32.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 629 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80401 Delin (Ty I) (Temp) Each =================================================== FBR0343-043 US 34 D-28-P STRUCTURE REPLAC -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 50.00 29.96 32.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 5.00 37.12 37.12 37.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 37.12 37.12 37.12 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25.00 47.42 30.24 33.02 =============== 630-80415 Adv Warn Flash or Seq Panel (C Type) Day ==================================================== NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 2.00 1600.00 1629.45 1629.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 1600.00 1629.45 1629.45 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 10.00 53.04 53.04 53.04 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 53.04 53.04 53.04 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 310.87 315.78 315.78 =============== 630-80417 Seq Flashing Warning Light Each =================================================== NHPPR100-251 SH 2/ Vasquez 06/25/20 1.00 250.00 82.65 79.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 250.00 82.65 79.30 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 150.00 30.00 97.29 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 150.00 30.00 97.29 150.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 151.00 31.46 97.26 149.53 =============== 630-80430 Rumble Strip (Port) Each =================================================== STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 2.00 4000.00 2950.00 2400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 4000.00 2950.00 2400.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 630 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80430 Rumble Strip (Port) Each =================================================== STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 6.00 2000.00 2500.00 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 2000.00 2500.00 2000.00 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 4.00 2000.00 2276.42 1829.25 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 2.00 4000.00 14690.00 16800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 2666.67 8483.21 6819.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 2571.43 6134.93 4122.64 =============== 630-80440 Port Rumble Strips (Temp) Each =================================================== STR2871-038 US 287 Passing Lanes Springfi 03/05/20 24.00 300.00 1436.84 1755.00 NHPP0502-082 US 50 MONTROSE RE CHIP SEAL 03/05/20 24.00 1500.00 296.25 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 48.00 900.00 676.45 1052.50 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 42.00 1500.00 1397.50 1025.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 4.00 900.00 775.00 700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 46.00 1447.83 1319.69 996.74 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 36.00 1200.00 959.71 500.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 24.00 300.00 513.89 159.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 60.00 840.00 797.60 363.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 154.00 1040.26 848.97 767.44 =============== 630-80511 Mobile Pvmt Marking Zone LUMP SUM =============================================== SHER500-210 R5 FY19 CENTER LINE RUMBLE ST 01/09/20 1.00 10000.00 31250.00 27500.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 631 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80511 Mobile Pvmt Marking Zone LUMP SUM =============================================== STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 1.00 4000.00 3500.00 2500.00 STR141A-044 SH 141 AND SH 145, FROM SLICK 01/30/20 1.00 10000.00 5564.98 5000.00 MTCER500-213 R5 FY 20 / FY 21 STRIPING 02/13/20 1.00 15000.00 42894.50 50000.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 1.00 9740.00 5401.44 6000.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 1.00 7300.00 5945.49 4565.00 NHPP0171-105 SH 17 MP 84.5 to US 285 & SH 03/05/20 1.00 18000.00 6030.12 6090.35 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 1.00 10000.00 5500.00 7500.00 NHPP0502-082 US 50 MONTROSE RE CHIP SEAL 03/05/20 1.00 5000.00 14117.74 10000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9.00 9893.33 14189.02 13239.48 NHPP1602-169 US 160 WC TUNNEL EAST RESURFA 04/02/20 1.00 13000.00 8653.79 8121.46 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 1.00 5000.00 11325.00 15000.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 1.00 10000.00 20906.12 21500.00 NHPP1601-077 US 160 MP 29.750 - MP 34.891 04/09/20 1.00 10000.00 9666.67 12500.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 1.00 8000.00 7210.50 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 9200.00 12191.16 12024.29 MTCER400-381 REGION 4 FY21 EPOXY 07/02/20 1.00 27500.00 28000.00 25000.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 1.00 9280.61 9280.61 9280.61 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 18390.31 24880.10 17140.31 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 1.00 10000.00 8966.67 10000.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 1.00 10000.00 7855.29 4750.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 1.00 8000.00 10119.97 9000.00 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 1.00 5000.00 7483.67 9830.00 STA141A-051 This will be a chipseal proje 12/17/20 1.00 12000.00 20300.00 15500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 9000.00 11248.53 9816.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21.00 10324.79 13753.13 12506.54 =============== 630-80520 Mobile Pvmt Mkg Zone Day ==================================================== STA0142-066 SH 14 New Raymer West 01/09/20 2.00 1050.00 9365.50 8586.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 632 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80520 Mobile Pvmt Mkg Zone Day ==================================================== STA006A-067 SH 6 Merino to Atwood 01/16/20 2.00 1500.00 3090.05 4500.00 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 7.00 2000.00 4750.00 7500.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 15.00 1500.00 1013.55 300.00 STR0101-027 SH 10 Overlay La Junta West 02/27/20 12.00 1500.00 942.14 1800.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 2.00 2000.00 4505.00 5900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 40.00 1590.00 2303.90 2914.30 MTCER200-265 Pueblo 05/28/20 120.00 550.00 328.75 415.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 120.00 550.00 328.75 415.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 1.00 3000.00 3048.25 2899.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 3000.00 3048.25 2899.10 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 6.00 5000.00 1000.67 502.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 5000.00 1000.67 502.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 167.00 973.65 740.28 1031.64 =============== 630-80570 Mobile Profilograph Oper Zone Day ==================================================== NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 6.00 2000.00 3003.33 2510.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 2000.00 3003.33 2510.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 2000.00 3003.33 2510.00 =============== 630-85006 Impact Atten (Sand Fill) (Temp) Each =================================================== NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1.00 5400.00 5431.47 5431.47 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 5400.00 5431.47 5431.47 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 633 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-85006 Impact Atten (Sand Fill) (Temp) Each =================================================== NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 2.00 4500.00 5153.47 5153.47 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 4500.00 5153.47 5153.47 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 6.00 5000.00 5006.67 4520.00 C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 1.00 3500.00 2981.55 1400.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 6.00 4568.53 5129.78 5129.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 13.00 4685.48 4682.98 4561.44 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 4706.95 4735.78 4689.82 =============== 630-85010 Impact Atten (Temp) Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 2.00 4500.00 10067.75 9591.00 BR0343-040 US 34 REPUBLICAN RIVER BRIDGE 01/16/20 8.00 5500.00 7841.33 8000.00 FBR0343-043 US 34 D-28-P STRUCTURE REPLAC NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 2.00 3000.00 6200.42 8400.84 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 1.00 5000.00 6020.00 3500.00 STR116A-001 SH 116 A Surface Treatment Pr 02/13/20 2.00 700.00 2027.15 1300.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 1.00 7250.00 3754.25 850.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 2.00 4000.00 2000.00 2000.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 4.00 5000.00 9502.36 9101.40 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 2.00 5000.00 3716.67 1500.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 50.00 4000.00 7810.97 8900.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 4.00 5000.00 4280.00 4480.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 2.00 8000.00 5754.00 4400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 80.00 4333.13 7642.13 7775.74 IM0761-226 I76/SH52 Interchange 04/02/20 10.00 4500.00 7628.18 6890.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 1.00 5000.00 3490.72 3500.00 SFTY2254-091 225 Ramp Improvements 04/09/20 2.00 5000.00 10000.00 12500.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 8.00 1200.00 5715.35 3300.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP FSA1602-159 US 160 AND SH 17 INTERSECTION 04/30/20 4.00 4500.00 4223.67 3220.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 634 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-85010 Impact Atten (Temp) Each =================================================== FBR0343-042 US 34 D-27-G STRUCTURE REPLAC 05/07/20 2.00 6500.00 7254.59 8500.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 9.00 7000.00 7060.91 7060.91 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 36.00 4544.44 6621.73 6034.12 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 2.00 5500.00 8350.00 8300.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 2.00 8316.06 8316.06 8316.06 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 5.00 7000.00 6175.71 8900.00 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 1.00 6000.00 1470.00 1250.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 2.00 4000.00 5407.86 4700.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 4.00 4000.00 4369.26 3814.80 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 25.00 6000.00 6517.77 6517.77 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 41.00 5917.86 5619.01 6502.09 NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 2.00 5000.00 12052.83 3658.50 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 2.00 5000.00 5006.67 5520.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 2.00 5000.00 6138.03 904.00 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 1.00 4000.00 5950.00 10600.00 STR0641-104 SH64 RANGELY EAST/US 40 DINOS 12/03/20 2.00 3500.00 5884.96 4000.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 1.00 6000.00 3832.00 2600.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 2.00 5000.00 1895.00 1890.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 12.00 9941.67 9941.67 9941.67 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 12.00 3000.00 3226.67 3730.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 38.00 6598.98 7060.91 7060.91 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 74.00 6257.58 5328.28 6452.97 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 231.00 5263.82 6841.30 6854.51 =============== 630-85011 Imp Atten (Temp) Day ==================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 70.00 50.00 137.48 260.00 STR131A-038 SH 131 MP 51.95-55.73, ROUTT 01/16/20 50.00 100.00 26.25 25.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 4.00 400.00 200.00 220.00 C0641-106 SH 64 Meeker West Rural Resur 03/05/20 50.00 100.00 100.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 174.00 86.78 103.10 145.57 NHPPR100-251 SH 2/ Vasquez 06/25/20 14.00 250.00 246.51 0.01 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 14.00 250.00 246.51 0.01 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 635 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-85011 Imp Atten (Temp) Day ==================================================== IM0252-498 I-25 Maintenance Region 2 Pue 08/19/20 60.00 553.86 553.86 553.86 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 60.00 553.86 553.86 553.86 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 248.00 209.00 164.48 236.14 =============== 630-85020 Mobile Attenuator Each =================================================== NH 0503-093 US50 WEST OF TEXAS CREEK MP 2 01/23/20 1.00 30000.00 19950.95 18901.90 STR012A-050 CULVERT REPAIR I-25 AND US 35 01/30/20 1.00 16000.00 8600.00 8600.00 ITS0761-231 ITS FIBER AND CAMERAS ON I-76 02/06/20 2.00 20000.00 24410.40 950.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 1.00 4000.00 36114.17 38500.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 2.00 15000.00 15389.03 16000.00 NHPP0702-359 I-70 No Name Tunnel Lighting 02/27/20 2.00 20000.00 52723.88 10525.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 2.00 22000.00 40453.01 39925.00 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1.00 20000.00 62366.67 48500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12.00 18666.67 35561.40 20775.16 IM0761-226 I76/SH52 Interchange 04/02/20 2.00 13450.00 44263.20 53000.00 STR0341-101 SH 34 North of Grandby Resurf 04/02/20 1.00 20000.00 29354.79 54000.00 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 2.00 19000.00 7261.11 7222.22 C1211-090 SH-121 & 29th Ave / SH-121 & 04/23/20 1.00 13800.00 28635.00 9010.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 4.00 5000.00 11083.33 10250.00 ITS SW02-303 R1: US 285, SH 83 R2: SH 83, 05/28/20 1.00 25000.00 90427.80 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 11.00 13063.64 34218.87 20859.49 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 4.00 14500.00 30672.86 18500.00 STM094A-038 SH94 WB PASSING LANE 09/01/20 1.00 13305.70 13305.70 13305.70 MTCE0702-386 Grand Junction 09/03/20 2.00 10000.00 14166.67 14500.00 CR400-374 FY 20 Culvert Prioritization 09/17/20 1.00 5000.00 6706.00 6700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 12038.21 25229.99 15375.71 MPC040-061 R2 FY 21 Sign Replacement 10/01/20 2.00 16700.42 19000.00 20000.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 636 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-85020 Mobile Attenuator Each =================================================== NHPP1602-168 US 160 WOLF CREEK WEST FIBER 10/22/20 2.00 10000.00 39431.83 68295.50 ITS ITSB-003 ITS FIBER ON I-76 10/29/20 1.00 90000.00 39622.83 1000.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 1.00 25000.00 69379.04 72320.00 ITSITSB-002 ITS CV ROADSIDE UNITS 11/12/20 2.00 40000.00 56963.67 50600.00 NHPP006A-068 US 6 TUNNELS LIGHTING AND ITS 11/19/20 1.00 20000.00 77858.00 81716.00 C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 1.00 24000.00 23903.00 15600.00 IMM240-180 I-25 RAMPS IN COS RESURFACING 12/03/20 2.00 16500.00 20188.50 23472.57 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 12.00 27116.74 39384.45 41281.01 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 43.00 18358.29 33586.34 25514.75 =============== 630-85040 Impact Atten (T-M-A) (Temp) Each =================================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 2.00 17500.00 53705.90 94383.00 NHPP4701-134 C-470 NOISE WALL WEST OF LUCE 02/06/20 1.00 20000.00 11116.00 7700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 18333.33 34346.85 65488.67 SHER400-373 R4 Signal Head Backplate Inst 05/28/20 4.00 10000.00 48110.00 4100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 10000.00 48110.00 4100.00 STMM086-083 ADA PUEBLO METRO 07/09/20 2.00 15000.00 21650.00 8300.00 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 2.00 8000.00 6000.00 6000.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 2.00 9000.00 8775.00 8750.00 SHER100-345 SIGNAL CONST PACKAGE B - 2179 08/06/20 3.00 20000.00 20400.00 15800.00 SHER400-379 Signal Head Backplate Install 08/20/20 4.00 5000.00 25812.50 9625.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 13.00 11076.92 18253.85 10153.85 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 4.00 40000.00 54750.00 55250.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 2.00 35000.00 39143.33 15000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 38333.33 49547.78 41833.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26.00 18038.46 33796.12 22917.92 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 637 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-85041 Mobile Attenuator Day ==================================================== FSA0253-262 I-25 SB BOTTLENECK I-76 TO I- 01/09/20 20.00 450.00 419.45 600.00 NHPP0253-265 I-25 AT ERIE PARKWAY ON AND O 01/09/20 40.00 385.00 378.33 525.00 NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 180.00 400.00 550.00 600.00 STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 40.00 500.00 474.87 596.18 STR0101-027 SH 10 Overlay La Junta West 02/27/20 10.00 700.00 719.28 800.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 30.00 400.00 624.06 568.84 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 75.00 400.00 591.20 450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 395.00 418.73 551.33 566.23 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 35.00 350.00 325.67 2.00 SHER100-339 WWD TRAFFIC CONTROL ENHANCEME 04/09/20 450.00 400.00 300.00 300.00 NHPP1601-077 US 160 MP 29.750 - MP 34.891 04/09/20 25.00 650.00 366.67 200.00 SFTY2254-091 225 Ramp Improvements 04/09/20 25.00 25000.00 952.50 1155.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 20.00 600.00 611.98 660.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP ITS SW02-304 ITS FIBER TO STATE BUILDINGS 05/14/20 150.00 750.00 514.25 121.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 20.00 500.00 543.14 543.14 MTCER200-265 Pueblo 05/28/20 30.00 425.00 237.50 100.00 ITSSW01-719 FY 20 ITS CAPITAL REPLACEMENT 06/11/20 55.00 650.00 427.50 250.00 FSAR400-356 FY 20 SIGNAL POLE REPLACEMENT 06/11/20 55.00 400.00 435.00 205.00 SHE016A-043 SH 21 & 16 SIGNALS PROJECT 06/18/20 30.00 300.00 464.36 577.80 NHPPR100-251 SH 2/ Vasquez 06/25/20 60.00 425.00 475.78 211.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 955.00 1123.56 440.33 281.90 C 0741-020 GEOHAZARD SH 74 MORRISON TO E 07/09/20 24.00 350.00 559.50 400.00 ITS 070A-033 I-70 FROM BENNETT TO BURLINGT 07/09/20 25.00 1000.00 721.26 825.00 STR012A-053 CRITICAL CULVERT REPAIR CO 12 07/09/20 68.00 390.00 503.33 525.00 MTCER300-255 MTCE R3 FY20/21 Signal Replac 07/09/20 70.00 500.00 263.75 50.00 FSAC010-124 US 40, US 287, SH 88 08/06/20 80.00 450.00 415.00 150.00 IM0252-498 I-25 Maintenance Region 2 Pue 08/19/20 12.00 609.24 609.24 609.24 C R100-288 R1 CURB RAMPS - PH 2 09/03/20 50.00 700.00 680.83 335.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 75.00 360.00 554.00 500.00 ER0702-406 ER I-7- Glenwood Canyon Grzly 09/08/20 10.00 400.00 907.60 1000.00 SHER100-338 WWD TRAFFIC CONTROL ENHANCEME 09/17/20 480.00 450.00 700.00 700.00 STM067A-040 SH 67 & KELLY RD SIGNAL IMPRO 09/17/20 78.00 325.00 585.38 495.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 20.00 650.00 706.09 706.09 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 992.00 462.28 589.03 546.09 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 638 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-85041 Mobile Attenuator Day ==================================================== MTCE0253-271 FY20 I-25 SIGN REPL PHASE 1 10/08/20 60.00 500.00 538.00 300.00 NHPP0702-407 PR I-70 Glenwood Springs Griz 11/03/20 75.00 400.00 533.56 500.00 NHPP R100-282 I-25 Culvert on I-25 South of 11/12/20 7.00 400.00 521.00 529.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 35.00 450.00 317.25 228.00 NHPP0703-444 I-70 EB - GEORGETOWN TO EMPIR 12/10/20 95.00 450.00 700.76 530.00 NHPPR100-325 SH8(SH74&STONE),SH58(MCLNTYRE 12/10/20 90.00 300.00 450.00 450.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 300.00 821.44 821.44 821.44 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 200.00 659.90 706.09 706.09 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 862.00 611.03 613.95 633.04 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,204.00 694.04 548.35 493.22 =============== 630-86801 Traffic Signal (Temp) LUMP SUM =============================================== NHPP0343-041 I-76 & US 34 FT. MORGAN AREA 01/09/20 1.00 30000.00 40031.55 8462.00 NH050A-034 US50A PUEBLO WEST PURCELL INT 03/26/20 1.00 14000.00 61800.00 48000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 19333.33 58362.88 34820.67 STR092A-030 SH92 MP 31.748-48.5,DELTA AND 04/02/20 1.00 10000.00 22505.00 25000.00 STA340A-021 SH340 MP 6-6.76 MESA COUNTY 04/02/20 1.00 10000.00 9633.33 12000.00 CC0852-106 US-85 LOUVIERS TO MP 191.75 04/23/20 1.00 25000.00 81471.16 79200.00 FBR0852-108 US-85 BETWEEN LOUVIERS AND MP -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 15000.00 55821.48 38733.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 17166.67 57330.44 36777.00 =============== 630-86810 Traffic Signal (Temp) Each =================================================== STA0703-443 I-70 EJMT TUNNELS PAVING 02/06/20 1.00 20000.00 29435.56 33121.12 STA059A-036 SH 59 SEIBERT TO COPE 02/06/20 2.00 17000.00 18000.00 16000.00 STA069A-033 SH69 MP 58.7 TO 71.58 02/13/20 4.00 18000.00 6430.62 6000.00 NHPP145A-080 SH 145 Keystone-Placerville R 03/05/20 1.00 15000.00 16000.00 16000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 17625.00 13221.07 13140.14 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 639 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-86810 Traffic Signal (Temp) Each =================================================== IM0761-226 I76/SH52 Interchange 04/02/20 2.00 17000.00 34249.66 37100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 17000.00 34249.66 37100.00 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 2.00 25000.00 5350.00 7100.00 BR2871-036 US 287 BRIDGE PREVENTATIVE MA 08/20/20 2.00 50000.00 44000.00 18500.00 BR101A-004 SH 101 (MP 19.35)(MP 19.98) 08/27/20 2.00 18540.00 43335.33 50000.00 SHE072A-046 I-70:SH72 RAMP & INTERSECTION 09/03/20 1.00 20000.00 75420.29 100000.00 STR2871-039 US 287 IN LAMAR SAVAGE AVE S 09/17/20 1.00 20000.00 44218.23 52850.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 1.00 10000.00 23655.71 45000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9.00 26342.22 42400.12 38783.33 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 2.00 70000.00 32516.67 37300.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 2.00 122409.13 131221.48 131221.48 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 96204.57 46617.35 84260.74 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 23.00 34647.75 37320.22 37626.70 =============== 632-00000 Night Work Lighting LUMP SUM =============================================== NHPP 0852-116 US85:HAMPDEN TO FLORIDA-RESUR 02/06/20 1.00 50000.00 80190.30 100000.00 FSA2873-194 US 287 Longmont Intersection 02/13/20 1.00 8000.00 22726.67 19360.00 NH0242-085 US 24 M.P. 291.38 to M.P. 296 02/27/20 1.00 28000.00 52522.67 67500.00 BR025A-046 K-18-U ON I-25 AT MP112 BRIDG 03/05/20 1.00 10000.00 31348.87 17760.28 NHPP0091-044 SH 9 FRISCO MAIN ST TO IRON S 03/05/20 1.00 60000.00 158466.67 75100.00 HPP 0501-067 US 50 AND SH 92 DELTA INTERSE 03/26/20 1.00 30000.00 21919.13 33900.00 SHE 0703-461 I-70 and Kipling North Phase 03/26/20 1.00 25000.00 36850.00 68310.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7.00 30142.86 49187.10 54561.47 IM0252-473 I-25 CABLE BARRIER PHASE IV 04/09/20 1.00 10000.00 32500.00 25000.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:30 Friday, January 22, 2021 640 ITEM UNIT COSTS BY PROJECTS -- 2020 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 632-00000 Night Work Lighting LUMP SUM =============================================== SFTY2254-091 225 Ramp Improvements 04/09/20 1.00 25000.00 47000.00 30000.00 C1601-082 Hawkins Signal and Curb Ramps 04/30/20 1.00 1500.00 16883.33 1650.00 NHPPR100-303 LONG MAST ARM SIGNALS PROJECT 05/07/20 1.00 17500.00 6643.33 4365.00 NHPP0402-098 US 40 CHIP SEAL MP 126 TO MP 05/14/20 1.00 10000.00 10526.67 25000.00 NHPP0253-276 I-25 EXPRESS LANES SEGMENT 5 05/15/20 1.00 46300.00 26308.77 26308.77 NHPPR100-251 SH 2/ Vasquez 06/25/20 1.00 15000.00 15095.35 5908.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7.00 17900.00 19853.72 16890.35 STMR200-249 US 24, M.P. 288.74; SH 115, M 07/23/20 1.00 25000.00 3750.00 2200.00 STMR200-260 R2 - 2020 CRITICAL CULVERT 07/23/20 1.00 20000.00 8087.50 2175.00 MTCE0702-386 Grand Junction 09/03/20 1.00 20000.00 2166.67 2500.00 NHPP1602-167 US 160 MP 126.4-128.19 09/17/20 1.00 20000.00 10934.40 10000.00 NHPP0253-283 I-25 Express Lanes Segment 6 09/18/20 1.00 43247.23 101857.21 101857.21 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 25649.45 13904.87 23746.44 NHPP 0702-390 Near MM 185 on I-70 West Vail 10/29/20 1.00 200000.00 142710.00 116130.00 NHPP0063-056 US 6 AVON TO DOWD JUNCTION 11/12/20 1.00 50000.00 45546.67 40000.00 NHPP0702-384 I-70 FRISCO TO SILVERTHORNE 11/12/20 1.00 75000.00 61180.65 54800.00 SHE391A-016 I-70 & KIPLING - 48TH SIGNALS 11/12/20 1.00 10000.00 4873.00 2292.00 FBR0252-491 I-25 S GAP CNTY LINE RD BRIDG 12/15/20 1.00 31628.58 31628.58 31628.58 NHPP0132-022 SH13 FORTIFICATION CREEK NORT 12/17/20 1.00 25000.00 28183.33 24850.00 NHPP0253-074 I-25 EXPRESS LANES SEGMENT 5 12/21/20 1.00 108118.08 170293.18 170293.18 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 7.00 71392.38 54229.80 62856.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26.00 37088.23 38028.71 40726.49 =============== 641-10000 Shotcrete Sq Yard ================================================ C0702-398 I-70 GLENWOOD CANYON WALL IMP 11/12/20 400.00 200.00 249.18 232.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 400.00 200.00 249.18 232.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 400.00 200.00 249.18 232.50 =============== 641-11000 Shotcrete (CL A) Cubic Yard ============================================= C133A-049 SH 133 ROCKFALL N. OF MCCLURE 12/03/20 11.00 700.00 2690.80 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 11.00 700.00 2690.80 1500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 700.00 2690.80 1500.00