Colorado Department of Transportation 10:44 Thursday, February 28, 2019 1 2018 Cost Data PROJECTS BID FROM 01/01/18 THROUGH 12/31/18 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20180104 MEDVED GLOBAL, INC. 2 $464,108.19 128.18 FSA145A-061 SH 145 Dolores Sidewalk Ramps 5 R 20180104 HAMILTON CONSTRUCTION CO. 5 $4,751,787.00 92.49 ER0342-058 PR US 34D MP 13.75 TO MP 14.71 4 R STA0342-060 US 34D OVERLAY AND BRIDGE WORK 4 R 20180104 A and S CONSTRUCTION CO. 2 $3,317,399.50 140.36 STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 3 M 20180104 OLDCASTLE SW GROUP, INC. 4 $6,358,593.47 86.44 NHPP0402-092 US 40 RABBIT EARS WEST 3 M 20180104 A and S CONSTRUCTION CO. 4 $4,170,000.00 86.88 STR069A-032 SH69, MP 25.7 TO MP 50.1 2 R 20180104 OLDCASTLE SW GROUP, INC. 4 $7,993,121.01 93.38 STR133A-046 SH 133 BOWIE RESURFACING 3 R 20180104 KIEWIT INFRASTRUCTURE CO. 3 $732,877.25 99.04 SHE0212-010 SH 21, OMAHA INTERSECTION IMPR 2 U 20180111 CONNELL RESOURCES, INC. 4 $5,649,240.45 89.15 STA0142-065 SH-14 RESURF FT COLLINS, LEMAY 4 R 20180111 OLDCASTLE SW GROUP, INC. 2 $706,000.00 105.72 NHPP0702-373 I-70 GWC Longitudinal Joint Re 3 M 20180111 CC ENTRPRS TRAFFIC CONTROL SPECIALISTS 4 $288,151.00 71.03 MTCER100-296 MTCE R1 FY18 WEST SIGN REPLACE 1 M 20180111 SEMA CONSTRUCTION, INC. 10 $1,348,026.50 84.25 ER0252-466 PR MONUMENT CREEK BRANCH 2 R 20180112 KIEWIT INFRASTRUCTURE CO. 1 $6,244,782.75 102.88 CC0341-098 PR US 34 BTC LARIMER COUNTY ST 4 M 20180118 OLDCASTLE SW GROUP, INC. 1 $2,508,762.75 99.01 STR133A-045 SH 133 MCCLURE PASS TO REDSTON 3 M 20180118 INTERFACE COMMUNICATIONS COMPANY 4 $260,990.00 60.10 ITSSW01-833 ABOUT 1.5 MILES NORTH OF THE N 00 U 20180118 AMERICAN WEST CONSTRUCTION, LLC 6 $587,531.00 117.51 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.19 2 P 20180118 A-1 CHIPSEAL COMPANY 3 $986,679.32 97.58 MTCE0712-017 SH 71 CHIP SEAL MP 123 TO MP 1 4 P 20180125 MAIN ELECTRIC LTD 5 $673,129.18 134.64 NHPP5502-088 US 550 RIVERSIDE SNOW SHED LIG 5 M Colorado Department of Transportation 10:44 Thursday, February 28, 2019 2 2018 Cost Data PROJECTS BID FROM 01/01/18 THROUGH 12/31/18 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20180125 RALPH L. WADSWORTH CONSTRUCTION CO., LLC 7 $8,269,006.74 118.13 BR0252-444 Ramp BMP I-25 and Rockrimmon 2 U 20180125 AMERICAN WEST CONSTRUCTION, LLC 4 $528,827.75 113.24 ER1151-033 PR SH 115-MP 34.7 2 M ER1151-034 PR SH 115-MP 40.5 2 M NH0242-086 PR US24 MONTESSORI WALL MP 294 2 M 20180125 HAMILTON CONSTRUCTION CO. 5 $2,669,354.87 65.02 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR D 3 M 20180201 Geovert, LLC 4 $371,019.75 47.78 C0703-440 AVALANCHE CONTROL SYSTEM: EJMT 3 M 20180201 LAWRENCE CONSTRUCTION CO. 7 $2,587,000.00 101.39 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NEA 3 M 20180208 ARROW ELECTRIC SERVICE, INC. 3 $843,032.30 76.64 STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 2 U 20180215 A and S CONSTRUCTION CO. 4 $7,463,000.00 107.32 NHPP1602-153 US 160 SH 84 TO TREASURE FALLS 5 R 20180215 HAMILTON CONSTRUCTION CO. 5 $2,698,605.35 85.81 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE NE 3 M 20180301 FLATIRON CONSTRUCTORS, INC. 8 $12,889,175.73 95.47 ER007A-026 PR SH-7 FLOOD (PH II),EP - JCT 4 M STA007A-025 SH-7 NON FLOOD, SHO (PH II),EP 4 M 20180301 Kilgore Companies, LLC dba Elam Construc 4 $660,992.61 88.47 NHPP5502-096 US550 STRIPING & RUMBLE STRIPS 5 R 20180301 JALISCO INTERNATIONAL, INC. 4 $435,638.25 96.80 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROVE 1 U 20180308 CASTLE ROCK CONST. CO. OF COLO, LLC 10 $5,230,572.48 73.15 ER144A-002 SH 144 East and West of Goodri 4 P 20180308 MCATEE CONSTRUCTION CO. 8 $2,311,447.40 108.13 STA1381-008 SH 138 LODGEPOLE CREEK & HMA O 4 R 20180308 OLDCASTLE SW GROUP, INC. 4 $3,812,025.65 79.54 NHPP1602-166 US 160 JCT 172 TO BAYFIELD RES 5 M 20180308 AMERICAN WEST CONSTRUCTION, LLC 3 $234,000.00 85.09 NH0504-904 CRITICAL CULVERT REPAIR - SH50 2 P 20180308 DIAMOND SURFACE, INC. 2 $611,952.80 156.91 FSAR200-247 US 287 FROM MP 0.00 (STATE LIN 2 R Colorado Department of Transportation 10:44 Thursday, February 28, 2019 3 2018 Cost Data PROJECTS BID FROM 01/01/18 THROUGH 12/31/18 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20180308 WORK ZONE TRAFFIC CONTROL 7 $232,254.78 62.11 MTCER500-201 R5 FY18 SIGN REPLACEMENT 5 M 20180308 PAVEMENT MARKING, INC 5 $1,387,500.00 91.22 MTCER500-202 R5 FY18 STRIPING 5 M 20180308 A-1 CHIPSEAL COMPANY 2 $386,075.00 120.27 MTCER500-203 WITHIN CDOT'S R5 MAINTENANCE S 5 R 20180315 STRUCTURES, INC. 2 $1,666,197.47 131.92 NHPP1602-164 US 160 WOLF CREEK PASS RSA 5 M 20180328 KIEWIT INFRASTRUCTURE CO. 1 $5,973,274.10 98.58 ER0341-099 PR US 34 BIG THOMPSON CANYON P 4 M 20180329 JALISCO INTERNATIONAL, INC. 2 $2,899,893.50 97.53 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESURF 1 U 20180329 STRUCTURES, INC. 3 $1,557,188.80 147.35 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 & 1 M 20180329 ROADSAFE TRAFFIC SYSTEMS, INC 4 $1,597,895.26 86.11 MTCER300-245 MTCE R3 FY 18/19 REGIONWIDE EP 3 M 20180405 INTERFACE COMMUNICATIONS COMPANY 3 $307,077.48 91.56 NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPLA 1 U 20180412 SEMA CONSTRUCTION, INC. 3 $3,099,324.65 77.26 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR RE 1 R 20180412 PAONIA, INC 3 $1,748,999.00 120.56 STAR400-347 Various intersections across C 4 U 20180412 DRILL TECH DRILLING AND SHORING, INC. 5 $2,188,779.00 128.75 STM0242-081 US 24 ROCKFALL MITIGATION 2 M 20180412 LAWRENCE CONSTRUCTION CO. 10 $2,759,000.00 91.97 FBR069A-034 REPLACEMENT OF STR M-16-P 2 R 20180419 KIRKLAND CONSTRUCTION, LLLP 5 $1,970,003.22 98.50 FBR096A-047 STRUCTURE K-17-F FASTER BRIDGE 2 R 20180419 OLDCASTLE SW GROUP, INC. 4 $5,047,326.12 90.23 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COUN 3 M 20180419 KIRKLAND CONSTRUCTION, LLLP 2 $2,208,069.00 84.93 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 2 R 20180419 STURGEON ELECTRIC COMPANY, INC 4 $275,385.50 87.16 STA001A-002 SIGNALIZATION OF SH1 & I-25 SB 4 P Colorado Department of Transportation 10:44 Thursday, February 28, 2019 4 2018 Cost Data PROJECTS BID FROM 01/01/18 THROUGH 12/31/18 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20180419 DIETZLER CONSTRUCTION CORP. 8 $1,152,820.58 72.14 FBR0502-081 US 50, MP 190.4 Near Sargents 5 M 20180503 WILDCAT CONSTRUCTION CO., INC. 6 $1,655,812.92 82.79 NH0242-071 US 24 & 31ST STREET and US24 & 2 R 20180503 KRAEMER - IHC JOINT VENTURE 1 $248,287,287.00 100.00 FBR0253-261 I-25 NORTH: PROSPECT - BRIDGE 4 U FBR0253-263 I-25 NORTH: HILLSBORO-BRIDGE E 4 U IM0253-255 I-25 NORTH: SH 402 TO SH 14 4 R 20180503 K.E.C.I. COLORADO, INC. 3 $351,800.00 95.14 FSA0711-020 SH 71 & SH 94: PUNKIN CENTER 4 P 20180503 INNOVATIVE MARKING SYSTEMS, INC. 4 $267,525.00 96.08 MTCE0701-246 MTCE R3 FY18 I-70 CENTERLINE T 3 M 20180510 APC CONSTRUCTION CO., LLC 4 $6,325,654.65 103.18 STA 177A-011 SH 177 Arapahoe to Hampden Res 1 R 20180516 LAWRENCE CONSTRUCTION CO. 1 $3,928,195.00 100.00 FBR0705-087 I-70: EMERGENCY BRIDGE G-25-K 4 20180517 A-1 CHIPSEAL COMPANY 1 $1,187,794.51 137.90 MTCE R100-312 R1 CHIP SEAL 1 U 20180524 KIRKLAND CONSTRUCTION, LLLP 1 $3,591,516.00 98.03 NHPPC200-009 US 550/32_22_12_17 DURANGO SIG 5 U 20180531 CC ENTRPRS TRAFFIC CONTROL SPECIALISTS 3 $341,482.00 108.02 MTCER300-244 MTCE R3 FY 18/19 REGIONWIDE SI 3 M 20180607 MOUNTAIN CONSTRUCTORS, INC. 3 $229,247.38 107.18 STA0661-016 SH 66 and US 85 (BUS) IN PLATT 4 U 20180614 Casper Electric, Inc. 3 $5,900,202.00 114.06 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 3 M 20180614 TLM CONSTRUCTORS, INC. 6 $222,460.00 130.89 NHPP0761-230 I-76 AND COUNTY ROAD 22 AT FOR 4 U 20180621 ROADSAFE TRAFFIC SYSTEMS, INC 4 $2,889,565.07 103.20 MPR200-251 R2 FY19 PAVEMENT MARKING 2 R 20180628 ABCO CONTRACTING, INC. 2 $1,017,261.00 125.69 NHPP0703-436 EJMT PLENUM WATERPROOFING MEMB 1 M 20180628 HAMILTON CONSTRUCTION CO. 11 $2,268,930.75 101.33 ER055A-001 PR SH 55 FLOOD REPAIR 2015 4 R 20180705 Western Gravel Constructors, LLC 1 $378,100.00 106.49 NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 3 U Colorado Department of Transportation 10:44 Thursday, February 28, 2019 5 2018 Cost Data PROJECTS BID FROM 01/01/18 THROUGH 12/31/18 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20180705 ROADSAFE TRAFFIC SYSTEMS, INC 2 $7,180,244.07 92.76 MTCE R100-313 R1 FY19/20 REGIONWIDE PAVEMENT 1 U 20180712 INTERFACE COMMUNICATIONS COMPANY 6 $1,376,860.00 96.27 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 5 M 20180712 TRICON 2, LLC 7 $913,000.00 89.16 STR151A-010 R5 SH 151 MP 13.36 Priority Cu 5 R 20180712 HAMILTON CONSTRUCTION CO. 12 $6,391,749.95 95.15 FBR060A-022 SH 60 over the South Platte 4 R 20180712 CRUZ CONSTRUCTION, INC. 1 $711,736.35 118.68 SHE0701-245 I-70 MEDIAN CABLE RAIL INSTALL 3 U 20180719 IDEAL FENCING CORPORATION 3 $4,562,599.24 116.91 SHE 0701-227 I-70 Wildlife Fencing mp 65-87 3 R 20180719 JALISCO INTERNATIONAL, INC. 6 $1,794,145.39 93.15 NH0853-106 US 85 AND WCR 18 Intersection 4 R 20180720 KRAEMER NORTH AMERICA, LLC 1 $57,727,234.71 100.00 C0252-475 I-25 : MONUMENT TO CASTLE ROCK 1 R 20180802 AMERICAN WEST CONSTRUCTION, LLC 4 $1,948,948.00 80.50 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REGI 1 R 20180802 CRUZ CONSTRUCTION, INC. 2 $1,796,575.52 133.08 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 1 M 20180809 STURGEON ELECTRIC COMPANY, INC 2 $1,261,561.00 92.22 STA141A-045 SH 141 CLIFTON SIGNAL REPLACEM 3 U 20180809 CAN DO CONCRETE CONSTRUCTION, INC 4 $480,157.00 105.68 C0853-109 GREELEY ADA CURB RAMPS PHASE 1 4 U 20180823 TLM CONSTRUCTORS, INC. 10 $7,343,933.20 102.21 BR025A-028 BRIDGE I25A BUTTE CREEK N-17-B 2 R 20180823 AB Underground 6 $427,519.30 101.32 STA052A-040 SH 52: Antelope Creek 4 P 20180823 A and S CONSTRUCTION CO. 4 $5,715,910.10 109.92 STR167A-002 SH 167 from MP 0 - 4.9 Near Fo 2 R 20180828 WILDCAT CONSTRUCTION CO., INC. 4 $471,906.00 47.98 M850-027 US24E MANITOU AVE. AT RUXTON A 2 M 20180906 TLM CONSTRUCTORS, INC. 7 $2,486,906.00 103.62 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69. 2 R Colorado Department of Transportation 10:44 Thursday, February 28, 2019 6 2018 Cost Data PROJECTS BID FROM 01/01/18 THROUGH 12/31/18 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20180906 VILLALOBOS CONCRETE INC. 4 $1,072,539.60 90.39 NHPPR100-287 R1 CURB RAMPS - PH 2 1 U 20180906 AVERY ASPHALT 2 $747,127.70 74.71 STM0252-469 R2 ADA RAMPS I-25 INT S NEV- N 2 U 20180906 Western Gravel Constructors, LLC 1 $459,940.00 97.56 NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RAM 3 U 20180920 PAONIA, INC 4 $983,727.75 94.40 STAR400-345 Region 4 at US 85 bus @ 26th S 4 U 20180920 Lobato Construction, LLC 11 $5,644,835.25 102.63 FBR071A-018 SH 71 ARKANSAS RIVER FASTER BR 2 R 20180920 AMERICAN WEST CONSTRUCTION, LLC 1 $428,736.00 86.61 STMR200-246 R2–2018 CRITICAL CULVERTS REPA 2 R 20180920 KSK, LLC 2 $488,000.00 68.38 NHPP070A-032 I-70B & Z GRAND JCT PHASE 1 AD 3 U 20180927 PAONIA, INC 4 $567,645.50 87.33 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 1 U 20180927 Dykhuis Drilling Corp. 1 $623,007.00 105.78 MTCE0704-244 Crack Seal I-70 MP 328 TO MP 4 P 20181004 JALISCO INTERNATIONAL, INC. 2 $477,793.50 105.69 NHPP006A-066 US 6: I-25 TO PERRY WB OPS IMP 1 U 20181011 TRICON 2, LLC 10 $1,685,000.00 117.16 BR1131-006 SH 113 AT MP 11.5 4 P 20181018 INTERFACE COMMUNICATIONS COMPANY 4 $1,803,660.00 86.86 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE I 1 U 20181018 Kilgore Companies, LLC dba Elam Construc 2 $3,175,631.51 88.90 NHPP006A-064 US 6 MACK TO FRUITA 3 R 20181018 WORK ZONE TRAFFIC CONTROL 2 $2,083,185.51 104.16 SHER200-243 R2 WRONG WAY PREVENTION 2 R 20181018 MORTON ELECTRIC, INC. 3 $98,063.50 115.37 SHE2254-092 SH225 AND 17TH PLACE IMPROVEME 1 U 20181018 KOLBE STRIPING INC. 3 $2,600,565.78 96.75 MTCER400-365 REGION 4 FY 19 EPOXY 1 4 P 20181018 INNOVATIVE MARKING SYSTEMS, INC. 5 $1,140,653.00 105.23 FSA076A-011 I-76 FROM MM 25 TO MM 100 4 R Colorado Department of Transportation 10:44 Thursday, February 28, 2019 7 2018 Cost Data PROJECTS BID FROM 01/01/18 THROUGH 12/31/18 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20181025 Kilgore Companies, LLC dba Elam Construc 4 $2,347,950.93 91.23 NHPP0401-023 US 40 ELK SPRINGS 3 R 20181101 APC SOUTHERN CONSTRUCTION COMPANY, LLC 3 $11,223,247.57 97.59 NH2854-139 US285, MP 171.3 TO MP 190.0 2 R 20181101 ASPHALT SPECIALTIES CO., INC. 5 $2,588,250.33 96.19 FSA052A-047 SH52 WCR 13 INTERSECTION 4 R 20181108 JALISCO INTERNATIONAL, INC. 7 $2,185,498.15 125.62 STA3851-017 US 385 @ Cheyenne Wells 90 Deg 4 P 20181108 OLDCASTLE SW GROUP, INC. 4 $10,134,420.73 116.69 NHPP0702-366 I-70 Avon to Vail 3 M 20181115 CONCRETE WORKS OF COLORADO INC. 5 $858,557.00 107.42 ER052A-039 SH 170 4 R 20181115 OLDCASTLE SW GROUP, INC. 2 $10,956,000.00 93.54 NHPP4912-007 US 491 MP 36.15 - MP 53.74 5 R 20181115 Myers and Sons Construction, LP 6 $2,914,980.00 105.42 NHPP0402-090 US 40 CRAIG EAST BPM 3 R 20181115 PAONIA, INC 3 $6,975,058.80 75.61 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DEM 1 U 20181115 MOUNTAIN CONSTRUCTORS, INC. 8 $1,499,075.13 89.74 C060A-023 SH-60 AND WCR-40 INTERSECTION 4 R 20181115 CASTLE ROCK CONST. CO. OF COLO, LLC 3 $44,655,433.58 93.39 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 4 P 20181115 Western Gravel Constructors, LLC 1 $586,598.20 117.53 C5502-098 US 550/160 PEDESTRIAN SIDEWALK 5 R 20181115 PAONIA, INC 4 $2,478,928.50 88.53 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO W 00 M 20181127 KRAEMER NORTH AMERICA, LLC 1 $16,421,869.66 102.96 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHAS 3 M 20181129 KIEWIT INFRASTRUCTURE CO. 6 $4,544,016.40 97.81 STA086A-051 SH 86; WEST OF I-70 4 P 20181129 DURAN EXCAVATING, INC. 7 $934,380.09 72.26 ERR400-329 PR SH14 & US287 NW OF FT COLLI 4 M 20181129 MARTIN MARIETTA MATERIALS 4 $5,274,803.15 101.23 STU1211-085 SH121 (WADSWORTH): YALE TO 4TH 1 R Colorado Department of Transportation 10:44 Thursday, February 28, 2019 8 2018 Cost Data PROJECTS BID FROM 01/01/18 THROUGH 12/31/18 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20181129 THE WALSENBURG SAND AND GRAVEL 5 $1,682,120.50 129.39 STRM331-007 I25C/SH160 PED/BIKE IMPROV (W 2 R 20181129 ABCO CONTRACTING, INC. 2 $1,372,344.40 117.59 NHPP2854-138 US 285 DECK REHABILITATION (FY 1 M 20181129 CRUZ CONSTRUCTION, INC. 2 $588,125.95 80.28 C R500-198 R5 GUARDRAIL REPLACEMENT/UPGRA 5 M 20181206 TONY J. BELTRAMO AND SONS, INC. 4 $6,510,731.20 93.01 STA050A-028 US 50C Overlay 4th to Baxter R 2 R 20181206 HAMILTON CONSTRUCTION CO. 5 $1,382,424.60 113.07 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE PA 1 U 20181206 APC SOUTHERN CONSTRUCTION COMPANY, LLC 3 $3,636,000.00 91.41 STR112A-001 SH 112 FROM US 285 TO SH 17 5 R 20181206 CAN DO CONCRETE CONSTRUCTION, INC 5 $440,123.25 92.55 C2873-192 LOVELAND ADA CURB RAMPS PHASE 4 U 20181206 GRAHAM CONTRACTING LTD 4 $21,469,443.05 105.62 IM 0253-268 I-25: 120TH (SH 128) TO E470 1 U 20181213 PARSONS CONSTRUCTION GROUP INC 4 $16,600,000.00 101.93 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 4 P 20181213 A and S CONSTRUCTION CO. 3 $5,033,000.00 83.63 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 5 P 20181213 INTERMOUNTAIN SLURRY SEAL, INC. 2 $2,344,202.00 98.83 STAR100-279 FY20 HMA PREVENTATIVE MAINTENA 1 U 20181213 SIMON CONTRACTORS 3 $5,875,267.00 94.30 STA052A-045 SH 52B NEW RAYMER SOUTH 4 P 20181213 AMERICAN CIVIL CONSTRUCTORS, LLC dba A 7 $1,415,775.00 101.13 ER0252-467 PR SOUTH DOUGLAS CREEK 2 U 20181213 W.L. CONTRACTORS, INC. 3 $2,797,304.90 84.26 SHER100-302 RAMP METERING - DENVER METRO A 1 U 20181213 RALPH L. WADSWORTH CONSTRUCTION CO., LLC 4 $687,231.00 95.78 MTCE0253-267 MTCE R4 FY19 I25 CONCRETE PANE 4 R 20181220 PAONIA, INC 3 $791,344.00 83.30 MPR200-252 REGION 2 - PUEBLO COUNTY HIGHW 2 R 20181221 KRAEMER NORTH AMERICA, LLC 1 $104,131,317.37 100.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK TO 1 R ======= ================ ====== TOTALS 548 $843,963,647.66 98.40 Colorado Department of Transportation 10:44 Thursday, February 28, 2019 1 2018 Cost Data BRIDGE COST PER SQUARE FOOT (01/01/18 THROUGH 12/31/18) ------------------------------------------------------------------------------------------------------------------------------------ PROJECT NUMBER/ TERR/ TOTAL TOTAL COST PER DATE LET PROJECT LOCATION BRIDGE ID LENGTH WIDTH SQUARE FT COST SQUARE FOOT ------------------------------------------------------------------------------------------------------------------------------------ BRIDGE REPAIR 180125 BR0252-444 U Ramp BMP I-25 and Rockrimmon 0300 480.0000 75.5000 36240.0 $271,562 $7.49 0301 480.0000 75.5000 36240.0 $281,365 $7.76 0302 515.6000 42.0000 21655.2 $186,342 $8.60 0303 105.0000 75.5000 7927.5 $120,366 $15.18 0304 105.0000 75.5000 7927.5 $120,808 $15.24 0305 447.9000 75.5000 33816.5 $212,067 $6.27 0306 448.0000 76.0000 34048.0 $217,861 $6.40 0307 134.7000 75.5000 10169.9 $128,026 $12.59 0308 134.6000 75.5000 10162.3 $128,409 $12.64 0309 445.6000 42.0000 18715.2 $152,591 $8.15 180510 STA 177A-011 R SH 177 Arapahoe to Hampden Res 0301 71.0000 66.0000 4686.0 $163,804 $34.96 181115 NHPP0402-090 R US 40 CRAIG EAST BPM 0300 105.0000 30.0000 3150.0 $464,241 $147.38 0301 138.0000 44.0000 6072.0 $549,823 $90.55 0302 253.0000 40.0000 10120.0 $320,634 $31.68 0303 272.0000 30.0000 8160.0 $310,179 $38.01 0304 22.0000 36.0000 792.0 $16,566 $20.92 181129 NHPP2854-138 M US 285 DECK REHABILITATION (FY 0300 250.0000 114.0000 28500.0 $949,923 $33.33 WEIGHTED AVERAGE COST: NEW STRUCTURES 278382.0 $4,594,565 $16.50 BRIDGE DECK REPLACEMENT 180510 STA 177A-011 R SH 177 Arapahoe to Hampden Res 0300 64.0000 68.0000 4352.0 $649,775 $149.30 WEIGHTED AVERAGE COST: NEW STRUCTURES 4352.0 $649,775 $149.30 PRESTRES GIRDER (BOX SECTION) 181221 NHPP0252-476 R I-25 SOUTH GAP: CASTLE ROCK TO 0300 0.0100 139.0000 1.4 $13,656,197 $9,824,602.31 WEIGHTED AVERAGE COST: NEW STRUCTURES 1.4 $13,656,197 $9,824,602.31 PRESTRES GIRDER (I-SECTION G-72) 181127 NHPP0702-344 M I-70G EDWARDS INT UPGRADE PHAS F-10-QA 153.5000 60.0000 9210.0 $1,841,808 $199.98 WEIGHTED AVERAGE COST: NEW STRUCTURES 9210.0 $1,841,808 $199.98 Colorado Department of Transportation 10:44 Thursday, February 28, 2019 2 2018 Cost Data BRIDGE COST PER SQUARE FOOT (01/01/18 THROUGH 12/31/18) ------------------------------------------------------------------------------------------------------------------------------------ PROJECT NUMBER/ TERR/ TOTAL TOTAL COST PER DATE LET PROJECT LOCATION BRIDGE ID LENGTH WIDTH SQUARE FT COST SQUARE FOOT ------------------------------------------------------------------------------------------------------------------------------------ MAJOR STRUCTURE CBC OR PIPES 180111 ER0252-466 R PR MONUMENT CREEK BRANCH H-17-AG 24.0000 184.0000 4416.0 $106,737 $24.17 H-17-I 26.0000 112.0000 2912.0 $153,716 $52.79 181011 BR1131-006 P SH 113 AT MP 11.5 0300 28.0000 95.0000 2660.0 $586,197 $220.37 181101 NH2854-139 R US285, MP 171.3 TO MP 190.0 0300 30.0000 34.0000 1020.0 $18,208 $17.85 181213 ER0252-467 U PR SOUTH DOUGLAS CREEK 025A145120BL 14.0000 186.5000 2611.0 $540,955 $207.18 025A145120BL - BR 14.0000 186.5000 2611.0 $128,964 $49.39 WEIGHTED AVERAGE COST: NEW STRUCTURES 16230.0 $1,534,777 $94.56 FABRICATED STEEL GIRDER 180125 FBR0701-242 M I-70 G-03-Q CO OVERFLOW NEAR D G-03-Q 614.2000 40.5000 24875.1 $963,609 $38.74 180201 FBR0702-382 M I-70 F-10-L EAGLE RIVER BR NEA F-10-L 702.2000 40.5000 28439.1 $1,069,396 $37.60 180215 FBR0701-244 M I-70 F-05-L CO RIVER BRIDGE NE F-05-L 505.0000 44.4000 22422.0 $1,185,173 $52.86 WEIGHTED AVERAGE COST: NEW STRUCTURES 75736.2 $3,218,177 $42.49 ROLLED STEEL GIRDER 181127 NHPP0702-344 M I-70G EDWARDS INT UPGRADE PHAS F-10-I 140.8330 60.0000 8450.0 $1,165,614 $137.94 WEIGHTED AVERAGE COST: NEW STRUCTURES 8450.0 $1,165,614 $137.94 PEDESTRIAN OR BIKEWAY BRIDGE 181127 NHPP0702-344 M I-70G EDWARDS INT UPGRADE PHAS F-10-QB 139.8333 14.0000 1957.7 $371,965 $190.00 F-10-IA 140.8330 14.0000 1971.7 $358,388 $181.77 WEIGHTED AVERAGE COST: NEW STRUCTURES 3929.3 $730,353 $185.87 Colorado Department of Transportation 10:44 Thursday, February 28, 2019 3 2018 Cost Data BRIDGE COST PER SQUARE FOOT (01/01/18 THROUGH 12/31/18) ------------------------------------------------------------------------------------------------------------------------------------ PROJECT NUMBER/ TERR/ TOTAL TOTAL COST PER DATE LET PROJECT LOCATION BRIDGE ID LENGTH WIDTH SQUARE FT COST SQUARE FOOT ------------------------------------------------------------------------------------------------------------------------------------ MISCELLANEOUS 180215 NHPP1602-153 R US 160 SH 84 TO TREASURE FALLS 0302 197.9000 40.0000 7916.0 $71,380 $9.02 WEIGHTED AVERAGE COST: NEW STRUCTURES 7916.0 $71,380 $9.02 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 1 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 201-00000 Clear and Grub LUMP SUM =============================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 1.00 5000.00 2089.28 2178.55 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 1.00 5000.00 43966.67 5000.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 1.00 5000.00 24375.00 20000.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 1.00 10000.00 59294.00 34670.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 1.00 30000.00 69358.00 50000.00 CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 1.00 11401.38 20400.00 20400.00 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 1.00 6000.00 17461.30 63000.00 ER1151-033 PR SH 115-MP 34.7 01/25/18 1.00 4646.00 18820.76 60000.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 1.00 5000.00 32897.36 24620.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 1.00 20000.00 54318.12 80000.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 1.00 5000.00 22053.56 5463.35 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 1.00 10000.00 13029.91 27000.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 1.00 5000.00 21387.27 12000.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 1.00 60000.00 269970.93 211500.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 1.00 40000.00 30527.86 4500.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 1.00 12000.00 29751.55 8000.00 NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 1.00 3000.00 7200.00 7000.00 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 1.00 4612.91 8500.00 8500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 18.00 13425.57 52864.76 35768.44 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 1.00 20000.00 17081.40 39050.00 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 1.00 14755.00 37500.00 25000.00 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 1.00 30000.00 33500.00 17000.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 1.00 20000.00 27668.75 2750.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 1.00 2000.00 4700.00 2000.00 ER055A-001 PR SH 55 FLOOD REPAIR 2015 06/28/18 1.00 25000.00 52366.46 22500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 18625.83 33864.35 18050.00 FBR060A-022 SH 60 over the South Platte 07/12/18 1.00 60000.00 84682.92 116000.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 1.00 10000.00 22745.00 15000.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 1.00 23000.00 57750.00 23250.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 1.00 137445.00 137445.00 137445.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 1.00 10000.00 53599.45 40000.00 STA052A-040 SH 52: Antelope Creek 08/23/18 1.00 7000.00 7582.79 2500.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 2 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 201-00000 Clear and Grub LUMP SUM =============================================== BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 1.00 8000.00 40678.57 12000.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 1.00 30000.00 69884.52 50000.00 STMR200-246 R2–2018 CRITICAL CULVERTS REP 09/20/18 1.00 4500.00 13000.00 13000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9.00 32216.11 54035.79 45466.11 BR1131-006 SH 113 AT MP 11.5 10/11/18 1.00 8000.00 32859.38 25000.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 1.00 47000.00 65622.40 6867.20 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 1.00 7000.00 21955.15 15000.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 1.00 5000.00 29932.38 31000.00 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 1.00 15000.00 21450.67 2901.34 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 1.00 50000.00 56519.17 75000.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 1.00 10000.00 24691.79 52089.29 ER052A-039 SH 170 11/15/18 1.00 8500.00 22674.00 17370.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 88477.16 88492.57 88492.57 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 1.00 5000.00 19800.00 5000.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 1.00 10000.00 22479.01 7940.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 11.00 23088.83 32013.08 29696.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 44.00 20394.03 45435.88 33817.89 =============== 201-00001 Clear and Grub Acre =================================================== ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 5.00 5000.00 11051.81 6000.00 ER1151-033 PR SH 115-MP 34.7 01/25/18 0.34 5000.00 30282.50 110000.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.34 5000.00 11561.04 12621.72 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 7.60 1400.00 2910.59 3578.94 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 3.70 3000.00 8033.33 11100.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 0.04 19800.00 109750.00 39000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 11.34 1986.95 3855.22 6157.84 SHE0701-245 I-70 MEDIAN CABLE RAIL INSTAL 07/12/18 0.80 2500.00 6000.00 6000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 0.80 2500.00 6000.00 6000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 3 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 201-00001 Clear and Grub Acre =================================================== ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 1.00 6000.00 84447.86 40000.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 122430.00 122430.00 122430.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 64215.00 89195.63 81215.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19.48 9222.90 11178.68 15629.36 =============== 201-00005 Rem of Debris LUMP SUM =============================================== STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 1.00 2000.00 788.26 725.00 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 1.00 5000.00 8607.19 850.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 3500.00 5132.11 787.50 NHPP0703-436 EJMT PLENUM WATERPROOFING MEM 06/28/18 1.00 34000.00 106368.50 18000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 34000.00 106368.50 18000.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 1.00 20000.00 35816.67 75000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 20000.00 35816.67 75000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 15250.00 27872.12 23643.75 =============== 201-00007 Rem of Debris Each =================================================== STA086A-051 SH 86; WEST OF I-70 11/29/18 4.00 1000.00 848.72 200.00 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 4.00 4475.00 6231.67 7560.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8.00 2737.50 3295.52 3880.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 2737.50 3295.52 3880.00 =============== 201-00009 Rem of Debris Cubic Yard ============================================= NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 75.00 70.00 156.03 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 75.00 70.00 156.03 250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 75.00 70.00 156.03 250.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 4 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00000 Rem Str and Obstructions LUMP SUM =============================================== CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 1.00 5367.18 1.00 1.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 5367.18 1.00 1.00 NHPP0703-436 EJMT PLENUM WATERPROOFING MEM 06/28/18 1.00 32000.00 19537.00 20000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 32000.00 19537.00 20000.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 1.00 1300.00 7570.71 3000.00 NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 1.00 2000.00 5700.00 5700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 1650.00 7336.88 4350.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 1.00 10000.00 26547.01 5000.00 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 1.00 2000.00 11000.00 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 6000.00 17909.78 3250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 8777.86 12947.90 5866.83 =============== 202-00001 Rem Structure Each =================================================== ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 1.00 1500.00 2992.28 750.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1500.00 2992.28 750.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 5.00 2000.00 10000.00 10000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 2000.00 10000.00 10000.00 M850-027 US24E MANITOU AVE. AT RUXTON 08/28/18 1.00 50000.00 70540.79 52000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 50000.00 70540.79 52000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 8785.71 24794.61 14678.57 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 5 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00004 Rem Steel H or Pipe Piling Lin Foot =============================================== NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 200.00 60.00 78.33 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 200.00 60.00 78.33 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 200.00 60.00 78.33 50.00 =============== 202-00008 Tree Trimming Hour =================================================== NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 50.00 215.00 233.33 300.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 10.00 240.00 338.75 720.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 60.00 219.17 255.53 370.00 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 12.00 385.00 95.25 100.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 1.00 200.00 568.80 190.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 13.00 370.77 155.52 106.92 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 40.00 200.00 201.67 165.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 20.00 250.00 271.39 346.57 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 60.00 216.67 219.10 225.52 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 133.00 232.86 225.16 279.11 =============== 202-00009 Tree Trimming LUMP SUM =============================================== ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 1.00 10000.00 3721.43 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 10000.00 3721.43 2500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 10000.00 3721.43 2500.00 =============== 202-00010 Rem Tree Each =================================================== ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 7.00 400.00 491.80 450.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 6 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00010 Rem Tree Each =================================================== STA0342-060 US 34D OVERLAY AND BRIDGE WOR ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 32.00 400.00 440.06 220.00 CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 1.00 354.23 750.00 750.00 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 1.00 600.00 697.35 400.00 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 11.00 300.00 1008.99 2300.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 1,534.00 135.00 195.72 250.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 12.00 150.00 677.96 265.00 NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 2.00 600.00 793.33 1400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,600.00 143.72 210.51 266.33 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 1.00 1000.00 6000.00 6000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 1000.00 6000.00 6000.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 40.00 400.00 422.07 391.20 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 50.00 435.75 435.75 435.75 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 2.00 330.00 828.94 515.00 M850-027 US24E MANITOU AVE. AT RUXTON 08/28/18 1.00 500.00 2620.63 4000.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 21.00 275.00 576.89 765.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 114.00 392.30 529.95 513.43 NHPP0702-366 I-70 Avon to Vail 11/08/18 1.00 1000.00 3529.98 2500.00 ER052A-039 SH 170 11/15/18 3.00 250.00 769.34 1060.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 74.00 554.32 554.41 554.41 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 3.00 350.00 1290.00 750.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 8.00 500.00 1206.09 1668.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 1.00 1000.00 3379.66 1200.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 34.00 300.00 579.35 750.90 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 20.00 220.00 562.86 320.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 100.00 435.75 435.75 435.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 244.00 438.50 686.85 569.70 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,959.00 195.34 237.63 321.42 =============== 202-00011 Tree Trimming Each =================================================== STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 1.00 750.00 780.50 1321.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 750.00 780.50 1321.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 750.00 780.50 1321.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 7 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00014 Brush Clearing Hour =================================================== STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 5.00 200.00 265.00 275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 200.00 265.00 275.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 200.00 265.00 275.00 =============== 202-00015 Rem Headwall Each =================================================== ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 4.00 1250.00 3805.27 4000.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 16.00 600.00 697.02 1000.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 1.00 2000.00 4341.10 6700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 21.00 790.48 1321.11 1842.86 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 8.00 1008.00 1008.00 1008.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 1008.00 1008.00 1008.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 15.00 700.00 1289.19 2132.58 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 2.00 1500.00 2426.29 1900.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 2.00 500.00 932.35 1617.77 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 1.00 1500.00 1835.57 884.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 10.00 1008.00 1008.00 1008.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 30.00 869.33 1411.18 1666.27 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 59.00 860.07 1343.52 1639.87 =============== 202-00019 Rem Inlet Each =================================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 1.00 1000.00 1936.55 2373.10 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 1.00 1000.00 860.25 1000.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 3.00 800.00 802.13 500.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 8 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00019 Rem Inlet Each =================================================== NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 4.00 1250.00 1450.00 900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9.00 1044.44 1004.35 941.46 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 1.00 300.00 1275.00 1800.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 1.00 1260.00 1550.00 1400.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 5.00 2000.00 8000.00 8000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7.00 1651.43 3988.46 6171.43 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 38.00 987.00 987.00 987.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 1.00 1500.00 1030.03 800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 39.00 1000.15 995.97 982.21 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 3.00 1020.00 2187.86 925.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 1.00 1000.00 3239.94 2000.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 2.00 1119.29 1119.49 1119.49 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 5.00 1200.00 2400.00 1500.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 2.00 800.00 1699.35 500.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 2.00 1500.00 1290.27 950.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 41.00 460.00 788.65 920.58 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 40.00 987.00 987.00 987.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 96.00 783.74 1153.96 985.81 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 151.00 895.39 1217.52 1222.63 =============== 202-00020 Rem CBC Each =================================================== NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 1.00 20000.00 19250.00 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 20000.00 19250.00 5000.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 3.00 18301.50 18301.50 18301.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 18301.50 18301.50 18301.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 18726.13 18843.50 14976.13 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 9 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00021 Rem Manhole Each =================================================== C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 10.00 2336.51 2336.51 2336.51 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 2336.51 2336.51 2336.51 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 1.00 5000.00 6208.33 2500.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 22.00 700.00 1095.35 1088.40 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 2.00 2313.15 2313.15 2313.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 25.00 1001.05 1286.47 1242.84 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 35.00 1382.61 1388.42 1555.32 =============== 202-00022 Rem Headgate Each =================================================== C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 1.00 1000.00 798.39 692.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1000.00 798.39 692.12 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1000.00 798.39 692.12 =============== 202-00023 Rem Emb Prot Ty 3 Each =================================================== ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 1.00 1200.00 880.01 1500.00 ER144A-002 SH 144 East and West of Goodr 03/08/18 1.00 550.00 2228.86 863.09 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 875.00 1554.44 1181.55 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 1.00 609.00 609.00 609.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 609.00 609.00 609.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 2.00 1172.59 1172.80 1172.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 1172.59 1172.80 1172.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 940.84 1480.14 1063.54 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 10 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00024 Rem Emb Prot Ty 5 Each =================================================== FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 2.00 500.00 1004.07 239.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 500.00 1004.07 239.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 500.00 1004.07 239.80 =============== 202-00026 Rem S and D Pave Sq Yard ================================================ BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 1,190.00 20.00 17.52 16.20 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 41.00 40.00 88.03 41.43 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 565.00 13.00 17.50 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,796.00 18.25 19.38 17.34 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 18.00 33.60 33.60 33.60 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 47.00 100.00 48.57 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 65.00 81.61 48.02 17.26 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 192.00 37.31 37.32 37.32 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 123.00 20.00 71.00 42.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 315.00 30.55 56.24 39.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,176.00 21.93 21.93 20.50 =============== 202-00027 Rem Riprap Sq Yard ================================================ SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 53.00 20.00 30.67 20.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 43.00 20.00 29.16 15.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 5.00 20.00 166.98 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 101.00 20.00 36.76 21.83 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 862.00 25.00 33.00 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 862.00 25.00 33.00 65.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 11 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00027 Rem Riprap Sq Yard ================================================ C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 160.00 14.70 14.70 14.70 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 30.00 63.00 48.55 35.00 STA052A-040 SH 52: Antelope Creek 08/23/18 14.00 50.00 54.17 31.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 204.00 24.23 39.46 18.80 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 1,135.00 20.00 34.17 40.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 900.00 10.66 10.66 10.66 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 1,561.00 45.00 52.92 18.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 740.00 20.48 20.48 20.48 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,336.00 27.14 43.13 22.66 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,503.00 26.57 41.79 29.13 =============== 202-00029 Rem Gabion Cubic Yard ============================================= NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 304.00 21.00 36.33 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 304.00 21.00 36.33 60.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 304.00 21.00 36.33 60.00 =============== 202-00031 Rem of Fire Hydrant Each =================================================== NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 2.00 3000.00 6000.00 6000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 3000.00 6000.00 6000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 3000.00 6000.00 6000.00 =============== 202-00032 Rem Valve Each =================================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 6289.35 6290.43 6290.43 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 6289.35 6290.43 6290.43 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 6289.35 6290.43 6290.43 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 12 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00033 Rem Pipe Each =================================================== NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 1.00 200.00 3507.90 7000.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 2.00 500.00 2601.72 700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 400.00 2782.96 2800.00 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 1.00 30.00 929.00 2200.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 1.00 1000.00 2266.67 1400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 515.00 1658.64 1800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 446.00 2384.01 2400.00 =============== 202-00035 Rem Pipe Lin Foot =============================================== STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 200.00 25.00 26.83 25.50 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 2,633.00 28.00 21.06 22.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 433.00 20.00 21.50 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,266.00 26.76 21.37 22.08 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 15.00 27.00 94.95 54.79 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 90.00 50.00 200.00 200.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 119.00 40.00 25.13 18.38 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 224.00 43.15 64.43 93.79 FBR060A-022 SH 60 over the South Platte 07/12/18 235.00 20.00 27.30 20.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 110.00 75.00 119.31 31.25 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 3,362.00 26.25 26.25 26.25 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 76.00 51.00 52.38 18.00 STA052A-040 SH 52: Antelope Creek 08/23/18 123.00 25.00 37.83 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,906.00 27.69 38.44 25.47 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 180.00 30.00 54.90 56.69 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 13 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00035 Rem Pipe Lin Foot =============================================== FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 598.00 22.00 25.24 25.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 101.00 30.00 62.14 33.00 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 70.00 30.00 58.78 27.56 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 437.00 25.00 23.12 9.49 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 863.00 67.16 67.17 67.17 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 47.00 25.00 83.00 100.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 89.00 25.00 52.43 26.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 366.00 25.00 42.80 25.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 6,693.00 15.00 18.62 11.49 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 15.00 67.00 85.14 75.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 4,487.00 26.25 26.25 26.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 13,946.00 23.25 24.43 21.83 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21,342.00 24.81 25.34 23.29 =============== 202-00036 Rem of Pipe (Spec) Lin Foot =============================================== ER052A-039 SH 170 11/15/18 365.00 35.00 43.59 44.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 365.00 35.00 43.59 44.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 365.00 35.00 43.59 44.00 =============== 202-00037 Rem of End Section Each =================================================== ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 2.00 500.00 631.56 150.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 69.00 350.00 245.57 200.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 34.00 300.00 383.38 313.41 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 105.00 336.67 282.94 235.77 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 1.00 385.00 437.50 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 385.00 437.50 200.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 13.00 264.60 264.60 264.60 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 14 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00037 Rem of End Section Each =================================================== BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 1.00 700.00 423.27 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 14.00 295.70 333.59 254.63 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 16.00 350.00 286.67 115.00 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 1.00 225.00 354.59 309.17 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 13.00 480.77 480.85 480.85 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 31.00 264.60 264.60 264.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 61.00 332.42 302.35 272.18 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 181.00 332.33 287.68 249.30 =============== 202-00039 Rem of Bollard Each =================================================== STM0252-469 R2 ADA RAMPS I-25 INT S NEV- 09/06/18 1.00 75.00 600.00 700.00 NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 1.00 160.00 1500.00 1500.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 1.00 100.00 200.50 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 111.67 500.29 783.33 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 1.00 160.00 346.37 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 160.00 346.37 200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 123.75 444.32 637.50 =============== 202-00060 Rem Trav Time Indicator Each =================================================== NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 1.00 650.00 468.33 750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 650.00 468.33 750.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 650.00 468.33 750.00 =============== 202-00090 Rem Delineator Each =================================================== STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 650.00 7.00 3.78 3.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 15 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00090 Rem Delineator Each =================================================== STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 440.00 7.00 5.97 5.25 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 10.00 10.00 6.75 10.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 100.00 10.00 58.88 123.00 STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 15.00 8.00 15.00 15.00 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 295.00 7.00 4.33 6.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 1,000.00 6.50 5.99 2.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 486.00 8.00 5.93 7.01 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,996.00 7.11 6.83 8.03 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 12.00 15.00 15.12 2.80 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 12.00 6.50 13.60 11.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 8.00 10.00 38.13 11.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 31.00 10.00 37.27 2.50 FSA0711-020 SH 71 & SH 94: PUNKIN CENTER 05/03/18 56.00 10.00 13.83 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 119.00 10.15 23.96 19.25 FBR060A-022 SH 60 over the South Platte 07/12/18 23.00 10.00 16.23 15.00 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 3.00 60.00 37.00 16.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 2.00 10.00 18.48 12.50 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 34.00 20.00 19.75 17.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 92.00 3.20 3.20 3.20 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 30.00 25.00 14.00 10.00 C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 9.00 15.00 106.25 165.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 26.00 21.00 4.21 2.00 STA052A-040 SH 52: Antelope Creek 08/23/18 1.00 25.00 54.33 180.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 206.00 9.00 5.02 5.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 8.00 7.00 12.47 10.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 33.00 6.50 10.87 5.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 8.00 10.00 64.00 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 475.00 10.66 11.89 9.90 NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 3.00 8.00 10.25 10.50 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 208.00 7.00 4.15 4.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 754.00 8.00 3.53 2.08 NHPP0702-366 I-70 Avon to Vail 11/08/18 80.00 7.00 5.17 5.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 16 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00090 Rem Delineator Each =================================================== NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 703.00 10.00 2.12 2.10 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 559.00 5.00 7.00 7.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 16.00 20.00 50.46 5.90 ER052A-039 SH 170 11/15/18 10.00 10.00 21.52 3.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 35.00 5.34 5.41 5.41 STA086A-051 SH 86; WEST OF I-70 11/29/18 416.00 5.50 2.32 2.25 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 395.00 5.00 4.07 4.02 C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 8.00 100.00 68.80 84.00 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 729.00 5.00 3.03 3.00 MPR200-252 REGION 2 - PUEBLO COUNTY HIGH 12/20/18 1.00 20.00 33.67 25.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 525.00 1.07 1.07 1.07 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,442.00 6.26 4.04 3.27 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,032.00 6.89 6.38 5.67 =============== 202-00120 Rem CBC Lin Foot =============================================== C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 859.00 32.55 32.55 32.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 859.00 32.55 32.55 32.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 859.00 32.55 32.55 32.55 =============== 202-00150 Rem Wall Each =================================================== ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 4.00 2500.00 8090.95 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 2500.00 8090.95 5000.00 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 4.00 5000.00 4585.71 9000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 5000.00 4585.71 9000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 3750.00 6647.62 7000.00 =============== 202-00155 Rem Wall Lin Foot =============================================== ER1151-033 PR SH 115-MP 34.7 01/25/18 14.00 40.00 273.53 300.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 17 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00155 Rem Wall Lin Foot =============================================== ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 47.00 50.00 127.84 36.54 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 150.00 30.00 182.00 64.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 211.00 35.12 163.47 73.54 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 13.00 56.00 399.83 94.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 60.00 60.00 200.00 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 73.00 59.29 312.95 181.12 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 36.00 64.52 40.52 40.52 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 170.00 40.00 32.00 35.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 18.00 125.00 225.17 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 224.00 50.77 53.30 39.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 508.00 45.49 114.55 73.82 =============== 202-00160 Rem Wall Sq Foot ================================================ FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 425.00 24.00 16.00 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 425.00 24.00 16.00 14.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 120.00 13.50 14.95 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 120.00 13.50 14.95 10.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 545.00 21.69 15.77 13.12 =============== 202-00165 Rem Wall LUMP SUM =============================================== FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 1.00 9000.00 59914.01 6958.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 9000.00 59914.01 6958.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 9000.00 59914.01 6958.75 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 18 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00170 Grinding And Texturing Conc Pvmt Sq Yard ================================================ STM0252-469 R2 ADA RAMPS I-25 INT S NEV- 09/06/18 150.00 32.00 106.50 175.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 150.00 32.00 106.50 175.00 MTCE0253-267 MTCE R4 FY19 I25 CONCRETE PAN 12/13/18 300.00 25.00 28.93 62.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 400.00 22.44 22.44 22.44 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 700.00 23.54 27.30 39.39 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 850.00 25.03 39.81 63.32 =============== 202-00190 Rem of Conc Median Cover Matl Sq Yard ================================================ STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 159.00 15.00 29.13 44.50 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 355.00 24.00 18.25 6.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 514.00 21.22 23.39 18.25 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 2.00 17.00 122.84 61.36 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 17.00 122.84 61.36 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 146.00 22.00 12.63 15.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 120.00 30.00 24.67 25.00 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 71.00 18.00 26.20 20.00 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 5.00 50.00 67.14 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 342.00 24.39 21.00 20.06 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 858.00 22.47 22.26 19.07 =============== 202-00195 Rem of Median Cover Sq Yard ================================================ STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 23.00 20.00 197.25 200.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 19 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00195 Rem of Median Cover Sq Yard ================================================ STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 5.00 5.50 75.00 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 28.00 17.41 167.19 169.64 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 2,144.00 20.00 11.23 7.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,144.00 20.00 11.23 7.50 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 342.00 24.00 26.75 22.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 28.00 35.00 52.50 42.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 370.00 24.83 28.70 23.51 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 86.00 19.19 19.19 19.19 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 17.00 15.00 62.90 38.70 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 618.00 10.00 22.99 10.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 612.00 25.00 24.73 18.28 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,333.00 17.54 24.30 14.76 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,875.00 19.60 16.45 12.70 =============== 202-00200 Rem Sidewalk Sq Yard ================================================ STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 63.00 20.00 387.50 350.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 72.00 35.00 23.33 15.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 47.00 30.00 26.31 20.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 106.00 25.00 34.50 33.00 STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 134.00 26.00 30.00 15.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 398.00 18.00 29.12 25.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 36.00 20.00 35.94 17.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 515.00 25.00 14.25 6.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,371.00 23.40 34.63 31.72 STAR400-347 Various intersections across 04/12/18 34.00 50.00 89.80 79.41 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 20 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00200 Rem Sidewalk Sq Yard ================================================ NH0242-071 US 24 & 31ST STREET and US24 05/03/18 413.00 17.00 13.88 10.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 896.00 15.00 31.38 51.50 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 922.00 40.00 35.00 35.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 2.00 25.00 110.00 115.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,267.00 26.07 26.64 37.70 NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 461.00 25.00 50.00 50.00 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 84.00 25.00 28.33 30.00 C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 808.00 22.50 24.00 10.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 460.00 13.00 17.92 16.00 M850-027 US24E MANITOU AVE. AT RUXTON 08/28/18 30.00 40.00 76.71 43.00 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 1,959.00 20.00 30.25 18.00 STM0252-469 R2 ADA RAMPS I-25 INT S NEV- 09/06/18 919.00 14.00 20.15 12.30 NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 840.00 25.00 50.00 50.00 NHPP070A-032 I-70B & Z GRAND JCT PHASE 1 A 09/20/18 815.00 50.00 132.00 27.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6,376.00 23.96 37.78 23.98 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 1.00 20.00 650.00 700.00 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 158.00 30.00 13.00 15.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 221.00 20.00 21.87 10.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 254.00 15.00 42.53 50.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 20.00 100.00 81.83 65.00 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 226.00 32.00 70.00 70.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 156.00 20.26 20.25 20.25 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 975.00 15.00 34.68 25.80 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 570.00 17.00 28.80 50.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 534.00 20.00 36.17 10.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 5.00 150.00 311.36 274.08 C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 730.00 25.00 20.70 20.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 10,163.00 9.00 8.51 14.67 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 450.00 25.00 16.89 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 14,463.00 12.59 14.80 18.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 24,477.00 17.41 21.53 22.41 =============== 202-00201 Rem Curb Lin Foot =============================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 20.00 30.00 31.25 30.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 21 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00201 Rem Curb Lin Foot =============================================== STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 101.00 7.00 13.06 10.00 ER1151-033 PR SH 115-MP 34.7 01/25/18 1,278.00 13.00 7.94 12.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 376.00 5.00 12.60 8.53 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 421.00 13.00 8.25 6.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 550.00 13.00 9.00 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,746.00 11.81 9.48 9.46 STAR400-347 Various intersections across 04/12/18 5.50 50.00 191.60 466.81 NHPP0703-436 EJMT PLENUM WATERPROOFING MEM 06/28/18 750.00 19.00 53.50 67.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 755.50 19.23 55.00 69.91 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 44.00 25.00 94.00 94.00 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 101.00 6.00 22.40 10.00 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 702.00 12.00 21.50 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 847.00 11.96 23.37 20.99 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,348.50 13.13 16.14 22.21 =============== 202-00202 Rem Gutter Lin Foot =============================================== BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 16.00 30.00 27.17 23.83 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16.00 30.00 27.17 23.83 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 94.00 20.00 35.00 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 94.00 20.00 35.00 35.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 108.00 15.00 18.31 16.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 22 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00202 Rem Gutter Lin Foot =============================================== STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 20.00 26.00 37.40 100.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 285.00 14.00 17.82 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 413.00 14.84 18.99 15.93 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 523.00 16.23 20.09 19.60 =============== 202-00203 Rem Curb and Gutter Lin Foot =============================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 329.00 10.00 35.19 20.38 STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 738.00 5.00 31.25 30.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 2,510.00 8.50 4.67 3.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 291.00 10.00 7.95 7.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 7,783.00 10.00 6.50 7.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 1,544.00 8.00 12.34 2.59 STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 223.00 12.50 12.33 11.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 1,134.00 8.00 11.27 8.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 2,161.00 13.00 11.00 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16,713.00 9.65 9.08 7.39 STAR400-347 Various intersections across 04/12/18 25.50 20.00 81.41 119.22 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 4,462.00 10.00 6.27 3.50 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 497.00 9.00 17.08 15.34 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 1,483.00 12.00 45.00 45.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 21.00 10.00 21.34 11.01 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6,488.50 10.42 9.09 14.37 NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 272.00 12.00 35.00 35.00 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 238.00 12.00 8.25 9.00 C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 928.00 10.00 14.50 10.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 605.00 8.00 14.59 10.00 M850-027 US24E MANITOU AVE. AT RUXTON 08/28/18 52.00 20.00 34.22 43.00 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 2,862.00 10.00 14.50 12.00 STM0252-469 R2 ADA RAMPS I-25 INT S NEV- 09/06/18 919.00 14.00 17.15 16.30 NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 1,072.00 50.00 35.00 35.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 108.00 17.00 16.75 14.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 23 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00203 Rem Curb and Gutter Lin Foot =============================================== NHPP070A-032 I-70B & Z GRAND JCT PHASE 1 A 09/20/18 890.00 25.00 37.75 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7,946.00 17.68 17.72 16.37 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 130.00 8.00 14.50 9.00 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 478.00 12.00 8.72 6.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 2,381.00 7.00 10.66 7.50 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 496.00 25.00 12.38 11.00 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 507.00 35.00 50.00 50.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1,603.00 7.47 7.47 7.47 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 1,087.00 8.00 15.72 9.38 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 1,540.00 10.00 14.40 15.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 1,449.00 12.00 15.05 8.00 C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 1,101.00 13.00 12.10 12.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 17,547.00 5.00 4.72 6.41 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 31.00 15.00 28.57 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 28,350.00 7.39 8.02 8.31 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 59,497.50 9.73 9.41 9.79 =============== 202-00204 Rem C, G and Sidewalk Lin Foot =============================================== NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 59.00 35.00 125.00 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 59.00 35.00 125.00 125.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 209.00 25.00 18.86 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 209.00 25.00 18.86 15.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 268.00 27.20 25.85 39.22 =============== 202-00206 Rem Conc Curb Ramp Sq Yard ================================================ STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 82.00 50.00 447.50 400.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 17.00 45.00 28.97 15.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 24 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00206 Rem Conc Curb Ramp Sq Yard ================================================ STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 30.00 35.00 31.63 14.50 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 268.00 25.00 32.84 30.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 164.00 45.00 25.00 24.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 561.00 35.64 55.71 81.04 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 652.00 20.00 42.33 49.31 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 652.00 20.00 42.33 49.31 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 51.00 30.00 28.63 31.00 STM0252-469 R2 ADA RAMPS I-25 INT S NEV- 09/06/18 1,098.00 22.00 24.00 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,149.00 22.36 24.21 20.49 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 23.00 40.00 55.00 30.00 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 72.00 35.00 16.43 14.75 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 109.00 40.00 60.00 60.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 85.00 20.26 20.25 20.25 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 1,191.00 20.00 37.02 30.49 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 173.00 28.00 25.67 10.00 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 13.00 35.00 53.14 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,666.00 23.19 35.09 28.88 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,028.00 24.17 38.86 37.06 =============== 202-00207 Rem of Brick Pavers Sq Yard ================================================ NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 12.00 50.00 100.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.00 50.00 100.00 100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 50.00 100.00 100.00 =============== 202-00210 Rem Conc Pavement Sq Yard ================================================ FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 119.00 25.00 53.19 31.37 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 25 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00210 Rem Conc Pavement Sq Yard ================================================ STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 44.00 50.00 125.00 120.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 954.00 13.00 15.41 20.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 1,000.00 12.00 55.86 37.56 STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 4.00 25.00 110.33 95.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 421.00 50.00 42.20 25.00 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 263.00 26.00 36.50 22.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 210.00 30.00 29.86 10.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 2,571.00 35.00 35.00 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,586.00 27.54 38.34 26.62 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 20.00 35.00 67.00 150.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 481.00 50.00 50.00 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 501.00 49.40 51.89 53.99 NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 178.00 50.00 50.00 50.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 1,890.00 25.00 14.92 14.50 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 1,980.00 14.70 14.70 14.70 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 9.00 75.00 139.47 135.00 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 101.00 20.00 57.85 61.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 247.00 20.00 37.79 30.00 M850-027 US24E MANITOU AVE. AT RUXTON 08/28/18 58.00 45.00 49.24 40.00 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 143.00 30.00 39.50 22.00 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 43.00 25.00 41.00 41.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,649.00 21.70 19.25 18.81 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 205.00 20.00 30.44 16.90 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 60.00 80.00 64.33 43.00 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 114.00 50.00 75.00 75.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 597.00 23.46 23.46 23.46 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 356.00 20.00 46.72 30.49 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 745.00 12.00 38.40 50.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 946.00 20.00 26.90 10.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 43,485.00 10.00 9.26 10.50 MTCE0253-267 MTCE R4 FY19 I25 CONCRETE PAN 12/13/18 2,948.00 25.00 59.73 42.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 13,929.00 6.91 6.91 6.91 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 63,385.00 10.54 13.28 12.03 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 74,121.00 12.79 15.96 13.84 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 26 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00215 Rem Conc Pvmt (Planing) Sq Yard ================================================ BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 3,914.00 8.00 13.19 18.18 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,914.00 8.00 13.19 18.18 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,914.00 8.00 13.19 18.18 =============== 202-00217 Rem Conc Pvmt (Planing) (Spec) Sq Yard ================================================ BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 6,511.00 16.00 44.76 9.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6,511.00 16.00 44.76 9.95 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 9,719.00 30.00 17.25 17.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9,719.00 30.00 17.25 17.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16,230.00 24.38 36.53 14.47 =============== 202-00220 Rem Asphalt Mat Sq Yard ================================================ FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 192.00 15.00 55.08 25.15 STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 566.00 12.00 43.63 30.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 3,993.00 7.00 8.83 4.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 500.00 8.00 10.46 11.50 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 3,810.00 7.00 12.20 13.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 4,993.00 6.00 10.48 15.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR NHPP0702-373 I-70 GWC Longitudinal Joint R 01/11/18 317.00 10.00 22.00 19.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 8,191.00 8.00 8.19 5.25 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 65.00 25.00 60.40 90.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 59.00 7.50 53.34 30.17 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 1,306.00 8.00 8.14 5.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 13,619.00 6.50 10.89 9.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 23,476.00 5.00 3.36 1.46 NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 156.00 15.00 9.88 4.67 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 407.00 18.00 16.97 5.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 739.00 5.00 27.40 14.80 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 3,573.00 5.46 9.00 9.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 27 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00220 Rem Asphalt Mat Sq Yard ================================================ NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 1,607.00 12.00 15.00 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 67,569.00 6.48 7.04 6.66 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 1,235.00 7.00 28.56 22.00 STAR400-347 Various intersections across 04/12/18 19.00 35.00 94.33 105.00 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 2,644.00 13.00 11.75 13.50 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 92.00 40.00 27.98 8.80 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 1,796.08 40.00 20.05 24.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 11.00 20.00 91.09 34.35 FBR0705-087 I-70: EMERGENCY BRIDGE G-25-K 05/16/18 9,300.00 3.00 3.00 3.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 721.00 15.00 20.00 20.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 230.00 12.50 17.04 12.61 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16,048.08 10.03 15.94 9.62 NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 30.00 30.00 40.00 40.00 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 494.00 15.00 46.68 16.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 531.00 10.00 18.88 7.50 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 10,311.00 6.50 7.96 8.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 9,162.00 11.42 11.42 11.42 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 19.00 35.00 87.63 99.00 C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 100.00 20.00 30.25 12.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 14,461.00 6.00 4.73 5.00 STA052A-040 SH 52: Antelope Creek 08/23/18 666.00 7.50 9.46 5.25 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 1,720.00 8.00 13.14 5.00 M850-027 US24E MANITOU AVE. AT RUXTON 08/28/18 231.00 10.00 39.97 45.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 288.00 13.00 18.46 20.00 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 456.00 12.00 24.50 20.00 NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 179.00 30.00 30.00 30.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 6,821.00 7.00 6.09 8.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 25.00 50.00 57.00 46.00 NHPP070A-032 I-70B & Z GRAND JCT PHASE 1 A 09/20/18 30.00 30.00 52.13 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 45,524.00 7.91 7.09 8.27 BR1131-006 SH 113 AT MP 11.5 10/11/18 1,092.00 5.75 9.09 5.00 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 16.00 100.00 55.00 35.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 18,265.00 4.00 5.12 3.17 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 28 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00220 Rem Asphalt Mat Sq Yard ================================================ FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 10,690.00 6.00 8.38 5.65 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 430.00 5.00 16.01 12.50 NHPP0702-366 I-70 Avon to Vail 11/08/18 254.00 20.00 41.03 50.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 27,022.00 10.00 6.53 8.05 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 636.00 40.00 21.62 21.24 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 1,095.00 8.00 12.83 12.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 1,317.00 6.00 13.46 7.15 ER052A-039 SH 170 11/15/18 132.00 8.00 17.80 6.00 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 198.00 55.00 50.00 50.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 15,529.00 17.06 17.06 17.06 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 567.00 7.00 26.44 10.64 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 3,120.00 5.00 15.20 20.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 85.00 15.00 41.03 16.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 1,103.00 19.50 15.47 20.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 22,076.00 8.00 8.87 2.50 C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 120.00 32.00 41.00 20.00 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 250.00 15.00 10.89 13.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 24,098.00 4.00 4.29 1.50 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 69,177.00 8.41 8.41 8.41 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 197,272.00 8.34 8.10 7.31 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 326,413.08 7.98 7.70 7.42 =============== 202-00222 Removal of Detour Pavement Sq Yard ================================================ ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 910.00 12.14 14.00 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 910.00 12.14 14.00 14.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 910.00 12.14 14.00 14.00 =============== 202-00226 Rem of Asph Mat (Special) Sq Yard ================================================ IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 90.00 25.00 76.18 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 90.00 25.00 76.18 35.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 90.00 25.00 76.18 35.00 =============== 202-00240 Rem Asphalt Mat (Planing) Sq Yard ================================================ STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 5,364.00 10.00 4.79 8.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 29 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00240 Rem Asphalt Mat (Planing) Sq Yard ================================================ STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 62,453.00 2.50 5.05 3.50 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 2,589.00 6.75 3.83 4.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 23,425.00 3.00 2.00 1.75 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 325,753.00 2.00 1.86 1.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 34,411.00 2.20 1.87 1.50 STA0342-060 US 34D OVERLAY AND BRIDGE WOR NHPP0702-373 I-70 GWC Longitudinal Joint R 01/11/18 9,849.00 5.00 11.00 11.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 148,439.00 3.00 2.96 2.50 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 2,380.00 6.00 9.35 3.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 4,965.00 6.00 6.05 5.86 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 19,029.00 5.00 2.74 3.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 245,889.00 3.50 2.23 2.50 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 7,692.00 10.00 3.71 3.68 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 6,433.00 4.00 4.75 5.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 7,697.00 8.00 4.75 4.49 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 810.00 10.00 6.75 8.50 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 1,689.00 5.00 14.55 15.64 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 908,867.00 2.97 2.45 2.21 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 3,646.00 5.00 5.06 10.00 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 4,962.00 2.30 3.04 3.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 2,445.00 7.00 5.59 5.62 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 171,225.00 2.75 1.73 1.40 FSA0711-020 SH 71 & SH 94: PUNKIN CENTER 05/03/18 1,270.00 7.00 9.00 8.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 196,507.00 2.40 2.27 2.42 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 125.00 26.00 96.00 51.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 380,180.00 2.63 2.19 2.10 FBR060A-022 SH 60 over the South Platte 07/12/18 25,615.00 6.50 4.03 4.00 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 210.00 8.00 49.02 13.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 565.00 15.00 11.23 8.55 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 136,382.00 1.69 1.69 1.69 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 2,655.00 6.00 5.39 7.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 34,537.00 3.00 3.36 4.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 5,691.00 6.00 6.02 5.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 2,200.00 2.30 4.27 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 207,855.00 2.72 3.73 2.59 BR1131-006 SH 113 AT MP 11.5 10/11/18 2,705.00 3.50 4.10 3.57 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 30 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00240 Rem Asphalt Mat (Planing) Sq Yard ================================================ NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 37,840.00 2.00 2.68 2.60 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 2,528.00 2.75 7.58 9.48 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 346,716.00 1.50 2.05 1.96 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 17,109.00 3.50 3.98 2.30 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 12,331.00 3.25 3.71 3.15 NHPP0702-366 I-70 Avon to Vail 11/08/18 351,363.00 2.35 2.75 2.20 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 690,855.00 4.60 2.42 1.49 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 7,442.00 3.00 5.50 3.99 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 919.00 16.00 29.32 28.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 3,835.00 4.00 8.00 8.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 773.00 5.00 7.55 7.57 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 2,000.00 12.73 11.67 11.67 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 188,586.00 3.00 2.53 2.12 STA086A-051 SH 86; WEST OF I-70 11/29/18 3,505.00 3.50 6.22 4.50 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 311,010.00 2.00 1.96 1.90 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 4,883.00 10.00 4.82 3.59 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 217,955.00 1.50 1.73 2.10 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 2,110.00 10.00 5.36 6.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 87,535.00 2.30 1.51 0.41 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 261,238.00 2.88 2.88 2.88 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,553,238.00 2.88 2.37 1.99 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,050,140.00 2.87 2.44 2.08 =============== 202-00246 Rem Asphalt Mat (Planing)(Special) Sq Yard ================================================ ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 2,730.00 4.00 7.66 10.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 2,571.00 12.00 20.70 6.50 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 3,058.00 12.00 14.40 24.96 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 151.00 30.00 30.45 40.00 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 3,557.00 10.00 25.82 36.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12,067.00 9.83 16.44 21.22 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 1,323.00 6.00 13.48 11.92 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,323.00 6.00 13.48 11.92 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 2,785.00 8.43 8.43 8.43 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 31 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00246 Rem Asphalt Mat (Planing)(Special) Sq Yard ================================================ STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 1,309.00 7.00 15.73 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,094.00 7.97 13.19 12.77 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 1,056.00 10.00 21.50 10.21 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 3,444.00 16.00 15.42 13.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 839.00 8.00 16.99 11.50 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 6,203.00 13.00 3.71 5.40 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 78,524.00 3.00 1.99 2.10 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 27,729.00 8.40 8.40 8.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 117,795.00 5.28 3.60 4.22 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 135,279.00 5.77 5.50 6.07 =============== 202-00248 Rem Rumble Strips Lin Foot =============================================== FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 1,300.00 10.00 4.48 3.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 3,425.00 10.00 3.15 0.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,725.00 10.00 3.44 1.12 FSA0711-020 SH 71 & SH 94: PUNKIN CENTER 05/03/18 180.00 10.00 17.00 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 180.00 10.00 17.00 16.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 56,000.00 2.74 2.74 2.74 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 56,000.00 2.74 2.74 2.74 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 53,033.00 2.73 2.73 2.73 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 53,033.00 2.73 2.73 2.73 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 113,938.00 3.05 2.94 2.69 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 32 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00250 Rem Pavement Marking Sq Foot ================================================ FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 144.00 6.00 9.65 4.30 STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 11,762.00 3.00 1.81 2.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 650.00 5.00 5.00 5.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 100,317.00 1.00 0.83 0.90 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 38,909.00 1.40 0.96 1.05 MTCE0712-017 SH 71 CHIP SEAL MP 123 TO MP 01/18/18 71,051.00 0.75 0.94 0.69 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 27,500.00 2.00 1.32 0.75 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 18,415.00 1.00 0.84 0.82 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 13,277.00 2.00 1.31 1.20 STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 746.00 4.00 5.65 5.45 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 8,806.00 2.00 1.19 1.10 NHPP5502-096 US550 STRIPING & RUMBLE STRIP 03/01/18 78,000.00 0.80 0.66 0.60 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 1,001.00 1.00 4.10 3.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 64,000.00 1.00 0.75 0.60 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 918.00 4.00 2.54 2.08 MTCER300-245 MTCE R3 FY 18/19 REGIONWIDE E 03/29/18 948,153.00 0.55 0.50 0.42 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 9,700.00 0.55 1.05 1.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,393,349.00 0.74 0.64 0.55 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 1,458.00 4.00 2.92 4.40 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 13,560.00 0.75 1.92 1.75 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 28,000.00 1.50 0.72 0.77 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 1,100.00 5.00 4.10 4.10 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 120.00 5.00 5.95 5.75 MPR200-251 R2 FY19 PAVEMENT MARKING 06/21/18 1,500.00 0.40 0.60 0.46 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 45,738.00 1.41 1.32 1.26 MTCE R100-313 R1 FY19/20 REGIONWIDE PAVEMEN 07/05/18 3,519,622.00 0.50 0.43 0.41 NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 752.00 3.50 5.00 5.00 FBR060A-022 SH 60 over the South Platte 07/12/18 5,100.00 2.00 1.64 1.25 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 3,489.00 5.00 6.28 6.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 1,270.00 3.00 4.87 3.61 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 440.00 6.50 2.81 2.10 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 99,094.00 1.41 1.41 1.41 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 10,640.00 2.50 2.23 2.15 C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 950.00 4.00 4.24 4.35 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 7,500.00 2.00 1.33 1.27 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 33 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00250 Rem Pavement Marking Sq Foot ================================================ NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 1,886.00 0.75 3.19 3.00 NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 743.00 3.50 6.00 6.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 157.00 6.00 7.38 7.50 NHPP070A-032 I-70B & Z GRAND JCT PHASE 1 A 09/20/18 220.00 3.50 5.38 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,651,863.00 0.54 0.50 0.46 NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 1,976.00 3.50 2.38 1.75 BR1131-006 SH 113 AT MP 11.5 10/11/18 720.00 4.00 3.21 2.22 MTCER400-365 REGION 4 FY 19 EPOXY 1 10/18/18 1,221,334.00 0.49 0.48 0.42 SHER200-243 R2 WRONG WAY PREVENTION 10/18/18 8,483.00 1.90 2.23 1.95 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 42,808.00 0.70 0.73 0.60 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 1,000.00 3.00 3.29 4.20 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 614.00 2.00 4.12 3.15 NHPP0702-366 I-70 Avon to Vail 11/08/18 57,425.00 1.00 0.66 0.65 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 115,618.00 0.95 0.52 0.53 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 8,700.00 3.50 2.92 3.50 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 3,500.00 2.30 2.88 2.36 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 23,547.00 1.73 1.77 1.77 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 2,466.00 0.80 3.45 5.00 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 1,330.00 1.00 2.35 2.70 STA086A-051 SH 86; WEST OF I-70 11/29/18 77,762.00 1.00 0.65 0.45 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 80,618.00 0.75 0.60 0.55 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 136,000.00 1.30 0.65 0.60 C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 525.00 4.00 3.93 4.40 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 18,000.00 2.00 1.92 1.98 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 90.00 0.75 5.96 6.00 STAR100-279 FY20 HMA PREVENTATIVE MAINTEN 12/13/18 120,000.00 0.70 0.89 1.05 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 197,625.00 0.91 0.91 0.91 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,120,141.00 0.72 0.62 0.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,211,091.00 0.64 0.59 0.52 =============== 202-00251 Rem Pvmt Marking (Asph Grooving) Sq Foot ================================================ MPR200-251 R2 FY19 PAVEMENT MARKING 06/21/18 1,750,023.00 0.30 0.49 0.46 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,750,023.00 0.30 0.49 0.46 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,750,023.00 0.30 0.49 0.46 =============== 202-00252 Rem Pvmt Marking (Conc Grooving) Sq Foot ================================================ MPR200-251 R2 FY19 PAVEMENT MARKING 06/21/18 90,969.00 1.00 0.60 0.46 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 90,969.00 1.00 0.60 0.46 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 90,969.00 1.00 0.60 0.46 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 34 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00254 Rem of Pvmt Mkg (12 In) Sq Foot ================================================ NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 1,000.00 1.50 1.05 1.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,000.00 1.50 1.05 1.10 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 14,000.00 1.50 0.68 0.66 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 14,000.00 1.50 0.68 0.66 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15,000.00 1.50 0.69 0.69 =============== 202-00256 Rem of Pvmt Mkg (15 In) Sq Foot ================================================ NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 1,000.00 2.00 1.05 1.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,000.00 2.00 1.05 1.10 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 12,500.00 1.50 0.68 0.66 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12,500.00 1.50 0.68 0.66 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13,500.00 1.54 0.69 0.69 =============== 202-00260 Rem of Pvmt Mkg (On-Call) Sq Foot ================================================ MTCER300-245 MTCE R3 FY 18/19 REGIONWIDE E 03/29/18 74,000.00 0.60 0.54 0.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 74,000.00 0.60 0.54 0.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 74,000.00 0.60 0.54 0.42 =============== 202-00300 Rem Bldg(s) LUMP SUM =============================================== C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 1.00 5000.00 4425.42 2658.37 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 5000.00 4425.42 2658.37 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5000.00 4425.42 2658.37 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 35 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00400 Rem Bridge Each =================================================== CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 2.00 104442.30 154800.00 154800.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 1.00 28000.00 40593.36 9000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 78961.53 63434.69 106200.00 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 1.00 50000.00 69648.60 131798.95 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 1.00 80000.00 50655.56 38000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 65000.00 63317.59 84899.48 FBR060A-022 SH 60 over the South Platte 07/12/18 1.00 250000.00 227361.18 90000.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 2.00 80000.00 97497.81 90000.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 1.00 100000.00 127071.71 95000.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 1.00 100000.00 288884.16 300000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 122000.00 174910.36 133000.00 BR1131-006 SH 113 AT MP 11.5 10/11/18 1.00 15000.00 60155.42 25305.56 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 227956.26 214811.80 214811.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 121478.13 74215.09 120058.68 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 101653.41 129604.59 116126.36 =============== 202-00405 Rem of Pilling Each =================================================== FBR060A-022 SH 60 over the South Platte 07/12/18 6.00 1000.00 1094.40 275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 1000.00 1094.40 275.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 1000.00 1094.40 275.00 =============== 202-00425 Rem Bridge Railing Lin Foot =============================================== STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 263.00 30.00 19.33 20.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 36 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00425 Rem Bridge Railing Lin Foot =============================================== ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 1,629.00 35.00 12.08 4.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 1,294.00 30.00 85.38 40.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 1,465.00 30.00 86.32 60.09 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 801.00 25.00 13.26 15.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 1,082.00 30.00 17.20 25.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 120.00 50.00 61.50 58.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6,654.00 30.98 49.08 29.70 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 73.00 40.00 31.66 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 73.00 40.00 31.66 22.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 961.00 40.00 19.90 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 961.00 40.00 19.90 15.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 96.00 45.00 42.04 41.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 88.00 20.00 29.14 28.93 STA086A-051 SH 86; WEST OF I-70 11/29/18 950.00 35.00 22.23 75.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 278.00 20.00 16.65 13.83 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,412.00 31.79 22.66 57.77 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,100.00 32.13 42.23 32.44 =============== 202-00426 Rem Bridge Railing (Spec) Lin Foot =============================================== BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 1,498.00 41.10 83.48 64.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,498.00 41.10 83.48 64.75 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 1,852.00 20.00 5.81 4.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,852.00 20.00 5.81 4.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,350.00 29.44 51.32 31.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 37 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00450 Rem Port Present Str (1) Sq Yard ================================================ FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 188.00 200.00 181.48 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 188.00 200.00 181.48 120.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 52.00 170.00 233.97 147.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 52.00 170.00 233.97 147.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 240.00 193.50 188.95 125.85 =============== 202-00453 Rem Port Present Str (2) Sq Yard ================================================ STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 35.00 300.00 281.51 280.00 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 139.00 250.00 231.18 225.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 208.00 270.10 236.80 153.85 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 148.00 250.00 274.26 278.78 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 188.00 250.00 236.27 165.00 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 363.00 300.00 299.99 253.96 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,081.00 272.28 257.24 219.74 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 79.00 230.00 457.01 378.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 79.00 230.00 457.01 378.05 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 467.00 220.00 316.77 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 467.00 220.00 316.77 300.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 52.00 250.00 330.40 237.30 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 189.00 240.00 289.08 202.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 43.00 300.00 337.83 320.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 38 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00453 Rem Port Present Str (2) Sq Yard ================================================ ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 417.00 300.00 270.29 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 701.00 280.11 281.06 174.98 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,328.00 262.72 280.62 227.73 =============== 202-00458 Rem Port Pres Str (Hydrodem)(Fast-Track) Sq Yard ================================================ ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 2,730.00 95.00 87.08 50.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,730.00 95.00 87.08 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,730.00 95.00 87.08 50.00 =============== 202-00460 Rem Port Present Str (3) Sq Yard ================================================ ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 239.00 325.00 431.39 220.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 30.00 325.00 419.63 650.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 34.00 400.00 607.58 325.59 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 71.00 325.00 427.47 450.00 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 102.00 650.00 493.58 465.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 476.00 400.00 457.15 341.61 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 16.00 490.00 1156.32 575.29 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16.00 490.00 1156.32 575.29 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 131.00 500.00 494.32 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 131.00 500.00 494.32 400.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 12.00 450.00 611.33 420.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 39 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00460 Rem Port Present Str (3) Sq Yard ================================================ NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 39.00 480.00 471.67 400.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 8.00 600.00 767.37 875.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 74.00 550.00 434.04 220.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 133.00 523.46 484.83 330.23 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 756.00 440.95 480.72 354.67 =============== 202-00480 Rem Port Present Str (Special) Sq Yard ================================================ ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 52.00 400.00 282.71 210.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 52.00 400.00 282.71 210.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 52.00 400.00 282.71 210.00 =============== 202-00495 Rem Port Present Str LUMP SUM =============================================== FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 1.00 10000.00 55112.08 12500.00 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 1.00 1000.00 12063.43 1516.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 5500.00 38968.84 7008.15 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 1.00 80000.00 51461.46 35200.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 1.00 80000.00 158375.00 168500.00 NHPP0761-230 I-76 AND COUNTY ROAD 22 AT FO 06/14/18 1.00 12000.00 57949.00 23500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 57333.33 77382.54 75733.33 FBR060A-022 SH 60 over the South Platte 07/12/18 1.00 5000.00 10996.29 4465.00 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 1.00 3500.00 11217.76 5675.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 4000.00 11084.88 5271.67 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 1.00 3000.00 6147.53 8085.22 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 40 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00495 Rem Port Present Str LUMP SUM =============================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 185686.83 197923.27 197923.27 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 1.00 10000.00 16400.00 5000.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 1.00 25000.00 27126.72 37122.86 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 55921.71 24311.69 62032.84 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 34890.57 36936.63 42096.89 =============== 202-00500 Rem Port Present Str Each =================================================== STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 12.00 200.00 1262.02 1270.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12.00 200.00 1262.02 1270.00 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 19.00 1000.00 1069.12 1300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 19.00 1000.00 1069.12 1300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 31.00 690.32 1143.79 1288.39 =============== 202-00502 Rem Port Present Str Cubic Yard ============================================= NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 2.00 1500.00 2709.67 2835.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 16.00 200.00 1421.40 170.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 18.00 344.44 1531.82 466.11 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18.00 344.44 1531.82 466.11 =============== 202-00503 Rem Port Present Str Sq Yard ================================================ STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 2.00 500.00 6742.50 7000.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 239.00 100.00 92.44 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 241.00 103.32 114.62 132.47 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 190.00 750.00 30.67 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 190.00 750.00 30.67 45.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 41 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00503 Rem Port Present Str Sq Yard ================================================ NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 1.00 500.00 4321.29 8323.88 NHPP0702-366 I-70 Avon to Vail 11/08/18 4.00 1500.00 2180.01 2175.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 266.00 120.00 178.17 125.00 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 2.00 100.00 2796.50 593.00 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 92.00 500.00 164.60 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 365.00 231.84 201.59 178.79 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 796.00 316.61 149.17 132.83 =============== 202-00504 Rem Exp Device Lin Foot =============================================== ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 275.00 150.00 188.74 125.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 133.00 220.00 178.98 200.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 1,946.00 170.00 162.51 122.31 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 118.00 220.00 204.89 54.67 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 103.00 220.00 184.69 300.00 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 98.00 300.00 234.47 275.41 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,673.00 179.33 169.13 135.93 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 84.00 200.00 200.68 180.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 84.00 200.00 200.68 180.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 622.00 190.00 49.47 49.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 170.00 160.00 163.98 203.70 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 239.00 150.00 253.33 200.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 88.00 175.00 247.66 165.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,119.00 175.72 141.28 113.88 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,876.00 178.74 163.49 130.52 =============== 202-00505 Rem Port of Present Structure Sq Foot ================================================ ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 2,195.00 65.00 44.60 35.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 42 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00505 Rem Port of Present Structure Sq Foot ================================================ STA0342-060 US 34D OVERLAY AND BRIDGE WOR -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,195.00 65.00 44.60 35.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 110.00 150.00 174.47 112.00 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 298.00 35.50 117.04 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 408.00 66.37 134.67 212.79 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,603.00 65.21 59.35 62.87 =============== 202-00506 Removal of Waterproofing Membrane Sq Yard ================================================ NHPP0703-436 EJMT PLENUM WATERPROOFING MEM 06/28/18 2,644.00 28.00 66.50 47.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,644.00 28.00 66.50 47.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,644.00 28.00 66.50 47.00 =============== 202-00514 Removal of De-icing System LUMP SUM =============================================== NHPP0702-366 I-70 Avon to Vail 11/08/18 1.00 10000.00 76058.05 32000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 10000.00 76058.05 32000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 10000.00 76058.05 32000.00 =============== 202-00520 Rem of Exp Joint Matl Lin Foot =============================================== STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 40.00 60.00 12.41 12.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 40.00 60.00 12.41 12.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 60.00 12.41 12.50 =============== 202-00700 Rem Light Standard Each =================================================== SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 1.00 300.00 328.33 330.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 43 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00700 Rem Light Standard Each =================================================== BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 15.00 545.00 334.81 347.72 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16.00 529.69 334.63 346.61 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 1.00 500.00 545.25 750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 500.00 545.25 750.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 5.00 618.90 617.33 617.33 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 53.00 500.00 628.60 771.38 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 1.00 373.00 591.67 555.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 55.00 807.45 807.45 807.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 114.00 652.43 663.76 780.13 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 131.00 636.28 570.68 726.95 =============== 202-00705 Rem Light Standard Foundation Each =================================================== SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 5.00 500.00 303.33 310.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 13.00 545.00 777.59 1274.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 18.00 532.50 710.48 1006.91 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 3.00 500.00 561.68 671.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 500.00 561.68 671.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 2.00 750.00 1080.12 975.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 5.00 724.69 722.85 722.85 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 1.00 200.00 843.10 810.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 55.00 807.45 807.45 807.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 63.00 789.42 833.85 806.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 84.00 724.03 753.90 844.30 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 44 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00710 Rem Power Pole Each =================================================== NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 5.00 500.00 611.23 700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 500.00 611.23 700.00 FSA0711-020 SH 71 & SH 94: PUNKIN CENTER 05/03/18 2.00 850.00 1083.33 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 850.00 1083.33 1500.00 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 10.00 1000.00 1260.17 503.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 1000.00 1260.17 503.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17.00 835.29 1096.91 678.24 =============== 202-00715 Rem CCTV Pole Each =================================================== NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 1.00 500.00 2303.33 420.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 500.00 2303.33 420.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 6.00 971.25 971.25 971.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 971.25 971.25 971.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 903.93 1415.28 892.50 =============== 202-00720 Rem CCTV Camera Each =================================================== NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 2.00 700.00 480.00 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 700.00 480.00 140.00 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 15.00 650.00 345.00 500.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 45 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00720 Rem CCTV Camera Each =================================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 341.25 341.25 341.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 16.00 630.70 344.92 490.08 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18.00 638.40 360.50 451.18 =============== 202-00725 Rem Ex Lighting Sys LUMP SUM =============================================== NHPP5502-088 US 550 RIVERSIDE SNOW SHED LI 01/25/18 1.00 14000.00 12946.14 12567.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 14000.00 12946.14 12567.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 14000.00 12946.14 12567.00 =============== 202-00750 Rem Luminaire Each =================================================== NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 6.00 100.00 57.79 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 100.00 57.79 100.00 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 10.00 100.00 232.00 66.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 1.00 400.00 273.25 150.00 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 53.00 100.00 222.75 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 64.00 104.69 225.49 136.88 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 4.00 250.00 156.58 75.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 5.00 105.80 105.53 105.53 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 55.00 404.25 404.25 404.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 64.00 371.29 323.66 360.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 134.00 231.81 235.57 241.95 =============== 202-00800 Rem Overpass Mtd Sign Brkt Each =================================================== MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 4.00 2500.00 516.50 750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 2500.00 516.50 750.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 2500.00 516.50 750.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 46 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00805 Rem Overhead Sign Str Each =================================================== NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 3.00 5000.00 7646.13 8292.25 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 3.00 5000.00 5050.00 4100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 5000.00 6348.06 6196.13 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 4.00 2000.00 7235.50 4500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 2000.00 7235.50 4500.00 SHER200-243 R2 WRONG WAY PREVENTION 10/18/18 1.00 6200.00 3000.00 2500.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 1.00 5000.00 5621.87 3600.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 1.00 6500.00 6209.60 4908.40 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 5242.09 5242.09 5242.09 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 5735.52 5324.36 4062.62 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 4353.01 6423.40 5101.95 =============== 202-00806 Rem Walkway Lin Foot =============================================== MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 331.00 6.00 99.63 7.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 331.00 6.00 99.63 7.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 331.00 6.00 99.63 7.50 =============== 202-00810 Rem Ground Sign Each =================================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 3.00 150.00 168.58 287.16 STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 88.00 85.00 45.99 35.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 9.00 150.00 53.33 55.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 6.00 150.00 103.00 79.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 19.00 100.00 87.44 100.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR MTCER100-296 MTCE R1 FY18 WEST SIGN REPLAC 01/11/18 42.00 85.00 178.75 50.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 50.00 100.00 222.00 275.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 47 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00810 Rem Ground Sign Each =================================================== NHPP5502-096 US550 STRIPING & RUMBLE STRIP 03/01/18 1.00 100.00 558.75 415.00 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 5.00 105.00 168.75 260.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 289.00 60.00 63.84 36.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 15.00 150.00 98.66 75.00 NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 3.00 60.00 103.89 100.00 MTCER500-201 R5 FY18 SIGN REPLACEMENT 03/08/18 79.00 100.00 89.00 50.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 14.00 125.00 362.12 124.23 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 21.00 120.00 86.50 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 644.00 82.63 84.17 67.99 STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 2.00 100.00 150.75 83.00 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 8.00 150.00 214.75 310.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 26.00 93.36 84.22 77.00 FSA0711-020 SH 71 & SH 94: PUNKIN CENTER 05/03/18 34.00 75.00 95.00 100.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 7.00 150.00 89.54 93.14 MTCER300-244 MTCE R3 FY 18/19 REGIONWIDE S 05/31/18 160.00 50.00 50.00 50.00 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 27.00 180.00 281.33 184.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 264.00 76.85 90.42 82.08 FBR060A-022 SH 60 over the South Platte 07/12/18 2.00 100.00 97.02 125.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 2.00 175.00 133.00 275.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 9.00 90.60 90.60 90.60 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 4.00 100.00 155.55 214.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 13.00 115.00 42.77 33.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 132.00 85.00 49.05 80.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 10.00 85.00 76.53 60.00 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 1.00 68.00 180.25 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 173.00 89.01 55.44 82.72 SHER200-243 R2 WRONG WAY PREVENTION 10/18/18 748.00 40.00 45.00 40.00 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 22.00 100.00 156.52 78.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 35.00 105.00 283.43 340.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 21.00 80.00 105.32 150.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 179.00 85.00 68.83 68.25 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 61.00 150.00 147.70 135.40 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 48 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00810 Rem Ground Sign Each =================================================== NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 4.00 100.00 153.00 194.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 8.00 200.00 108.23 70.80 ER052A-039 SH 170 11/15/18 8.00 250.00 90.42 80.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 34.00 106.60 81.19 81.19 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 3.00 90.00 121.20 65.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 16.00 100.00 86.29 90.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 144.00 80.00 28.21 25.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 12.00 75.00 220.41 231.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 100.00 95.00 112.70 113.55 MPR200-252 REGION 2 - PUEBLO COUNTY HIGH 12/20/18 248.00 40.00 64.67 39.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 212.00 42.64 42.64 42.64 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,855.00 60.49 76.96 59.29 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,936.00 68.50 79.23 64.63 =============== 202-00815 Rem of Sign (Special) Each =================================================== NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 2.00 1225.00 1503.33 560.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 1225.00 1503.33 560.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 1.00 5292.42 5292.42 5292.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 5292.42 5292.42 5292.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 2580.81 2044.63 2137.47 =============== 202-00821 Rem Sign Panel Each =================================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 24.00 70.00 53.81 32.61 STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 43.00 80.00 35.99 40.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 2.00 100.00 36.00 28.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 11.00 100.00 55.75 53.00 MTCER100-296 MTCE R1 FY18 WEST SIGN REPLAC 01/11/18 879.00 79.00 45.19 25.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 4.00 80.00 82.63 98.00 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 23.00 40.00 36.78 40.00 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 2.00 150.00 380.00 135.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 15.00 65.00 33.28 31.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 68.00 100.00 42.55 35.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 49 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00821 Rem Sign Panel Each =================================================== MTCER500-201 R5 FY18 SIGN REPLACEMENT 03/08/18 1,300.00 50.00 34.86 25.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 14.00 50.00 57.47 84.94 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 9.00 150.00 102.50 105.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,394.00 63.59 38.27 26.81 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 2.00 100.00 104.75 27.50 STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 2.00 100.00 123.25 83.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 16.00 51.64 78.88 42.00 FSA0711-020 SH 71 & SH 94: PUNKIN CENTER 05/03/18 1.00 50.00 60.00 70.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 14.00 51.00 66.27 81.09 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 1.00 50.00 76.00 76.00 MTCER300-244 MTCE R3 FY 18/19 REGIONWIDE S 05/31/18 1,420.00 10.00 17.00 25.00 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 11.00 145.00 134.58 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,467.00 12.16 20.36 26.36 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 25.00 80.00 36.55 50.00 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 50.00 40.00 272.00 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 75.00 53.33 193.52 30.00 SHER200-243 R2 WRONG WAY PREVENTION 10/18/18 401.00 45.00 22.50 30.00 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 10.00 50.00 135.11 110.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 1.00 150.00 197.57 195.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 35.00 100.00 47.65 47.25 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 150.00 35.00 115.00 30.00 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 4.00 50.00 58.66 40.64 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 2.00 100.00 110.00 40.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 48.00 60.00 22.72 20.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 80.00 10.00 30.55 30.15 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 1.00 250.00 1285.70 203.00 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 67.00 10.00 50.33 70.00 STA052A-045 SH 52B NEW RAYMER SOUTH 12/13/18 45.00 50.00 79.67 80.00 MPR200-252 REGION 2 - PUEBLO COUNTY HIGH 12/20/18 608.00 30.00 37.00 24.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 9.00 53.30 53.30 53.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,461.00 36.56 44.52 31.94 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,397.00 42.15 37.85 28.12 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 50 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00825 Rem Flashing Beacon Each =================================================== FSA0711-020 SH 71 & SH 94: PUNKIN CENTER 05/03/18 2.00 100.00 550.00 1300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 100.00 550.00 1300.00 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 2.00 186.00 417.75 750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 186.00 417.75 750.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 143.00 474.43 1025.00 =============== 202-00827 Rem of Pull Box Each =================================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 1.00 300.00 320.00 150.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 14.00 200.00 479.00 316.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15.00 206.67 473.52 304.93 STAR400-347 Various intersections across 04/12/18 7.00 175.00 170.67 250.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 1.00 202.00 231.95 180.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 1.00 200.00 164.34 164.37 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 12.00 300.00 415.00 280.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 21.00 248.90 307.06 259.73 NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 2.00 300.00 500.00 500.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 2.00 233.33 233.33 233.33 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 6.00 200.00 234.50 243.00 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 26.00 350.00 331.25 305.00 STM0252-469 R2 ADA RAMPS I-25 INT S NEV- 09/06/18 5.00 220.00 2750.00 5000.00 NHPP070A-032 I-70B & Z GRAND JCT PHASE 1 A 09/20/18 15.00 300.00 66.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 56.00 302.98 426.32 667.05 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 4.00 250.00 194.71 175.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 51 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00827 Rem of Pull Box Each =================================================== NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 21.00 400.00 225.00 300.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 82.00 231.00 231.00 231.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 107.00 264.88 224.31 242.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 199.00 269.53 340.58 368.47 =============== 202-00828 Rem Traf Sig Equipment LUMP SUM =============================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 1.00 3000.00 4250.00 2500.00 STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 1.00 60000.00 14895.00 6200.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 1.00 20000.00 10375.00 10800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 27666.67 10562.14 6500.00 NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPL 04/05/18 1.00 5000.00 4603.67 6586.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 1.00 30000.00 7309.26 5900.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 1.00 10000.00 15220.77 15363.07 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 1.00 10000.00 10666.67 10666.67 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 12500.00 9409.35 9974.85 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 1.00 15000.00 18487.50 23405.00 STM0252-469 R2 ADA RAMPS I-25 INT S NEV- 09/06/18 1.00 1500.00 9225.00 10000.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 1.00 11000.00 10365.75 12500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 9166.67 12111.00 15301.67 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 1.00 3000.00 2589.43 3000.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 4549.12 4537.60 4537.60 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 1.00 35000.00 26048.39 8318.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 14183.04 12167.83 5285.38 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13.00 15203.27 10806.12 9407.35 =============== 202-00830 Rem Traf Sig Face Each =================================================== STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 2.00 60.00 106.06 213.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 60.00 106.06 213.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 60.00 106.06 213.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 52 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00831 Rem Traf Sig Head Each =================================================== FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 16.00 110.00 110.92 61.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 1.00 200.00 109.43 80.22 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 17.00 115.29 110.85 62.13 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17.00 115.29 110.85 62.13 =============== 202-00832 Rem of Sign Panel (Spec) Each =================================================== NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 3.00 1000.00 2036.67 560.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 1000.00 2036.67 560.00 NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 5.00 400.00 1087.50 800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 400.00 1087.50 800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 625.00 1537.11 710.00 =============== 202-00840 Rem Traf Sig Pole Each =================================================== FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 4.00 1000.00 433.83 235.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 1000.00 433.83 235.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 1000.00 433.83 235.00 =============== 202-00842 Rem Mast Arm Each =================================================== FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 4.00 1000.00 435.83 235.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 1000.00 435.83 235.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 1000.00 435.83 235.00 =============== 202-00848 Rem Traf Sig Control+Cab Each =================================================== STAR400-347 Various intersections across 04/12/18 25.00 750.00 1339.67 1500.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 53 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00848 Rem Traf Sig Control+Cab Each =================================================== STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 1.00 2000.00 1251.25 1320.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 26.00 798.08 1335.19 1493.08 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 1.00 1000.00 587.65 390.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1000.00 587.65 390.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 27.00 805.56 1290.69 1452.22 =============== 202-00855 Rem Traf Sig Control Cab Each =================================================== NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 1.00 1000.00 1670.00 560.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 1000.00 1670.00 560.00 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 16.00 1250.00 1116.75 932.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 16.00 1250.00 1116.75 932.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17.00 1235.29 1141.52 910.12 =============== 202-00860 Rem Ped Push Button Each =================================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 16.00 100.00 145.00 70.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 8.00 230.00 47.69 142.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 24.00 143.33 96.34 94.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 4.00 50.00 75.05 56.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 50.00 75.05 56.25 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 40.00 250.00 108.50 44.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 40.00 250.00 108.50 44.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 54 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00860 Rem Ped Push Button Each =================================================== FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 8.00 40.00 34.19 16.50 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 19.00 100.00 43.96 46.45 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 2.00 50.00 272.78 250.00 C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 5.00 25.00 84.40 96.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 34.00 71.91 60.41 58.66 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 102.00 157.70 86.82 61.13 =============== 202-00888 Rem Video Detect Sys Each =================================================== FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 1.00 250.00 566.48 585.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 250.00 566.48 585.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 250.00 566.48 585.00 =============== 202-00889 Rem of Detect Warning Each =================================================== STM0252-469 R2 ADA RAMPS I-25 INT S NEV- 09/06/18 13.00 1218.00 500.00 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 13.00 1218.00 500.00 500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13.00 1218.00 500.00 500.00 =============== 202-00895 Rem of Impact Attenuator Each =================================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 1063.42 1063.42 1063.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1063.42 1063.42 1063.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1063.42 1063.42 1063.42 =============== 202-00900 Rem Conc Footing Each =================================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 10.00 692.90 692.90 692.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 692.90 692.90 692.90 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 692.90 692.90 692.90 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 55 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01000 Rem Fence Lin Foot =============================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 62.80 3.00 40.65 31.29 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 160.00 5.00 24.70 7.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 1,649.00 2.00 2.11 2.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 396.00 1.75 12.41 20.15 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 125.00 2.00 16.38 15.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 530.00 1.50 5.08 5.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 9,896.00 1.45 0.48 0.50 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 50.00 3.00 8.80 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12,868.80 1.59 1.32 1.89 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 1,749.00 1.00 4.11 1.06 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 2,681.00 2.00 1.70 1.10 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 1,537.00 2.00 1.79 1.65 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 252.00 15.00 4.69 3.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6,219.00 2.25 3.09 1.31 FBR060A-022 SH 60 over the South Platte 07/12/18 1,319.00 1.50 1.89 2.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 351.00 1.00 4.00 2.50 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 85,668.00 1.00 2.14 1.82 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 560.00 9.50 1.63 1.25 STA052A-040 SH 52: Antelope Creek 08/23/18 275.00 7.00 2.21 2.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 1,043.00 1.59 2.07 1.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 2,610.00 1.00 1.41 1.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 91,826.00 1.08 2.07 1.79 BR1131-006 SH 113 AT MP 11.5 10/11/18 560.00 2.00 2.94 2.50 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 432.00 5.00 2.03 2.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 165.00 3.68 3.73 3.73 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 95.00 2.00 3.20 5.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 340.00 3.00 3.21 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,592.00 3.20 2.84 2.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 112,505.80 1.24 1.98 1.79 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 56 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01030 Rem of Road Closure Gate Each =================================================== NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 2.00 1000.00 3651.67 665.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 1000.00 3651.67 665.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 4.00 1500.00 929.63 892.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 1500.00 929.63 892.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 1333.33 2290.65 816.67 =============== 202-01035 Rem of Gate Each =================================================== ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 1.00 410.00 349.20 300.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR ER144A-002 SH 144 East and West of Goodr 03/08/18 3.00 300.00 206.30 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 327.50 226.72 150.00 FBR060A-022 SH 60 over the South Platte 07/12/18 6.00 850.00 153.51 120.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 4.00 250.00 715.00 195.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 610.00 233.73 150.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 529.29 231.66 150.00 =============== 202-01130 Rem Gdrail Ty 3 Lin Foot =============================================== STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 7,688.00 6.00 4.13 4.00 STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 134.00 5.00 13.50 12.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 26,196.00 5.00 3.60 3.50 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 5,368.00 5.00 4.33 4.50 ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 550.00 5.00 9.61 5.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 122.00 4.00 19.38 19.75 STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 11,239.00 3.50 3.50 3.50 ER1151-033 PR SH 115-MP 34.7 01/25/18 103.00 9.00 30.12 40.00 ER1151-034 PR SH 115-MP 40.5 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 57 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01130 Rem Gdrail Ty 3 Lin Foot =============================================== NH0242-086 PR US24 MONTESSORI WALL MP 29 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 132.00 5.00 13.56 5.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 7,630.00 4.00 6.32 5.99 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 172.00 7.00 15.78 10.07 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 3,042.00 6.00 2.66 3.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 86.00 5.00 14.71 12.85 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 31.00 4.00 28.31 27.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 1,222.00 3.50 6.14 4.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 191.00 18.00 8.51 8.00 NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 10,867.00 8.00 4.20 4.26 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 287.50 4.00 5.78 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 75,060.50 5.26 4.63 4.14 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 747.00 4.25 10.04 17.93 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 398.00 10.00 8.62 7.70 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 12,725.00 5.00 2.74 2.65 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 1,345.00 5.00 9.67 6.50 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 1,071.00 5.00 4.14 3.56 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16,286.00 5.09 4.57 3.85 FBR060A-022 SH 60 over the South Platte 07/12/18 590.00 10.00 4.69 4.00 SHE0701-245 I-70 MEDIAN CABLE RAIL INSTAL 07/12/18 4,520.00 4.00 2.70 2.70 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 722.00 6.73 6.73 6.73 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 1,320.00 5.00 4.29 5.75 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 140.00 12.00 8.66 10.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 1,645.00 4.75 5.54 5.00 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 40.00 4.00 58.25 29.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8,977.00 5.02 4.99 4.21 NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 25.00 5.00 37.00 37.00 BR1131-006 SH 113 AT MP 11.5 10/11/18 900.00 4.00 9.48 8.00 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 1,400.00 5.00 3.63 3.50 SHER200-243 R2 WRONG WAY PREVENTION 10/18/18 25.00 30.00 17.50 25.00 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 11,676.00 4.00 2.80 2.55 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 2,063.00 4.50 4.31 4.18 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 58 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01130 Rem Gdrail Ty 3 Lin Foot =============================================== NHPP0702-366 I-70 Avon to Vail 11/08/18 36,516.00 3.75 3.66 3.60 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 966.00 4.00 4.03 3.99 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 272.00 7.00 6.87 4.72 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 2,244.00 4.53 3.31 3.31 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 100.00 5.00 19.67 10.00 C R500-198 R5 GUARDRAIL REPLACEMENT/UPGR 11/29/18 2,680.00 8.00 4.83 3.65 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 305.00 10.00 10.35 9.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 600.00 4.00 6.28 9.75 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 12.00 8.00 110.96 29.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 42,083.00 4.14 4.14 4.14 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 101,867.00 4.14 3.99 3.83 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 202,190.50 4.67 4.40 3.96 =============== 202-01135 Rem Gdrail Thrie Beam Lin Foot =============================================== NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 526.00 7.00 4.68 5.00 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 19.00 20.00 29.75 27.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 545.00 7.45 5.56 5.77 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 2,817.00 4.45 4.45 4.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,817.00 4.45 4.45 4.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,362.00 4.94 4.93 4.66 =============== 202-01140 Rem Gdrail Ty 4 Lin Foot =============================================== NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 960.00 20.00 20.64 9.00 STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 850.00 20.00 9.00 9.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 480.00 15.00 25.71 4.36 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 647.00 28.00 19.50 23.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,937.00 20.95 21.24 11.33 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 23,468.00 11.00 20.78 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 23,468.00 11.00 20.78 16.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26,405.00 12.11 20.82 15.48 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 59 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01170 Rem Gdrail Ty 7 Lin Foot =============================================== STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 80.00 35.00 63.69 22.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 80.00 35.00 63.69 22.25 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 10.00 25.00 82.50 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 25.00 82.50 40.00 NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 930.00 52.00 111.50 53.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 50.00 50.00 44.62 23.50 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 3,171.00 23.10 23.10 23.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,151.00 29.90 55.36 29.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,241.00 29.98 55.93 29.69 =============== 202-01200 Rem Tensioned Cable Barrier Lin Foot =============================================== C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 29,070.00 3.36 3.36 3.36 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 29,070.00 3.36 3.36 3.36 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 12,421.00 3.33 3.33 3.33 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 12,421.00 3.33 3.33 3.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 41,491.00 3.35 3.35 3.35 =============== 202-01300 Rem End Anchorage Each =================================================== STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 76.00 300.00 398.36 400.00 STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 4.00 350.00 420.00 400.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 61.00 200.00 185.71 183.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 60 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01300 Rem End Anchorage Each =================================================== NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 30.00 300.00 293.00 195.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 4.00 300.00 191.48 200.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 2.00 250.00 899.63 927.25 STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 48.00 200.00 190.00 190.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 8.00 280.00 428.76 417.15 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 20.00 220.00 337.95 400.00 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 1.00 265.00 447.75 420.00 ER144A-002 SH 144 East and West of Goodr 03/08/18 2.00 1500.00 376.65 390.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 2.00 230.00 205.00 215.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 258.00 259.94 312.52 285.87 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 4.00 350.00 303.94 287.20 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 4.00 400.00 434.06 137.50 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 71.00 215.00 291.94 325.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 1.00 300.00 2228.33 320.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 3.00 280.00 241.85 210.39 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 83.00 233.80 334.84 309.94 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 2.00 868.64 868.64 868.64 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 10.00 250.00 165.00 125.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 6.00 300.00 233.52 325.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 2.00 270.00 306.05 290.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20.00 328.86 247.90 275.86 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 14.00 200.00 362.50 350.00 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 28.00 300.00 328.19 300.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 6.00 300.00 257.28 156.84 NHPP0702-366 I-70 Avon to Vail 11/08/18 61.00 200.00 194.63 210.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 5.00 200.00 212.67 210.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 7.00 186.56 207.87 207.87 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 4.00 250.00 685.00 1000.00 C R500-198 R5 GUARDRAIL REPLACEMENT/UPGR 11/29/18 31.00 350.00 260.00 220.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 2.00 350.00 365.84 500.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 23.00 1301.36 1301.36 1301.36 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 181.00 386.67 310.19 393.96 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 542.00 300.80 312.71 325.28 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 61 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-04000 Plug Structure Each =================================================== NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 3.00 2000.00 5000.00 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 2000.00 5000.00 5000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 2000.00 5000.00 5000.00 =============== 202-04001 Plug Culvert Each =================================================== STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 1.00 2500.00 1287.50 1112.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 2500.00 1287.50 1112.50 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 1.00 1500.00 11433.14 7750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1500.00 11433.14 7750.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 14.00 800.00 925.24 347.88 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 2186.35 2186.73 2186.73 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 1.00 1500.00 1800.00 500.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 10.00 2500.00 4071.24 3200.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 2.00 1500.00 1605.48 2231.41 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 28.00 1531.66 1750.04 1572.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 1562.88 2127.28 1762.75 =============== 202-04002 Clean Culvert Each =================================================== ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 1.00 3000.00 2130.07 1950.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 4.00 1500.00 1718.84 1500.00 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 1.00 1500.00 7673.54 1000.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 40.00 1400.00 2017.35 3208.89 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 30.00 2000.00 1891.88 1500.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 1.00 2000.00 10366.67 8000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 77.00 1668.83 2047.83 2471.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 62 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-04002 Clean Culvert Each =================================================== STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 2.00 2500.00 2857.20 500.00 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 6.00 2500.00 1620.00 1800.00 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 7.00 2500.00 1650.00 1800.00 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 2.00 1000.00 4545.22 2100.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 67.00 1000.00 2138.69 1369.75 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 5.00 1350.00 2266.67 1250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 89.00 1272.47 2155.95 1422.73 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 3.00 1800.00 1857.25 2500.00 STMR200-246 R2–2018 CRITICAL CULVERTS REP 09/20/18 2.00 50000.00 38500.00 38500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 21080.00 3951.12 16900.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 16.00 1000.00 2610.32 2080.97 NHPP0702-366 I-70 Avon to Vail 11/08/18 8.00 3000.00 5173.71 3000.00 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 3.00 4000.00 2683.14 2366.27 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 4.00 2929.50 3038.49 3038.49 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 67.00 2000.00 2425.48 1361.90 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 10.00 2000.00 1701.47 700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 108.00 2015.91 2606.01 1618.48 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 279.00 2024.62 2289.01 2065.32 =============== 202-04004 Plug Culvert (Spec) Each =================================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 1918.79 1919.12 1919.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1918.79 1919.12 1919.12 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1918.79 1919.12 1919.12 =============== 202-04005 Clean Valve Box Each =================================================== STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 77.00 300.00 278.49 273.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 77.00 300.00 278.49 273.95 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 63 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-04005 Clean Valve Box Each =================================================== STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 49.00 200.00 249.21 236.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 49.00 200.00 249.21 236.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 126.00 261.11 267.10 259.52 =============== 202-04008 Clean Culvert Lin Foot =============================================== C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 6,763.00 26.62 26.62 26.62 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6,763.00 26.62 26.62 26.62 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 4,962.00 22.60 22.60 22.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,962.00 22.60 22.60 22.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,725.00 24.92 24.92 24.92 =============== 202-04010 Clean Inlet Each =================================================== NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 15.00 1000.00 354.35 367.06 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15.00 1000.00 354.35 367.06 NHPP0703-436 EJMT PLENUM WATERPROOFING MEM 06/28/18 50.00 91.00 384.50 330.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 50.00 91.00 384.50 330.00 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 9.00 1000.00 500.00 500.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 24.00 1000.00 246.21 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 33.00 1000.00 261.14 176.36 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 98.00 536.22 316.61 283.94 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 64 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-04041 Clean Box Girder (F & D) Sq Foot ================================================ NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 29,209.00 4.00 5.85 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 29,209.00 4.00 5.85 5.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 29,209.00 4.00 5.85 5.00 =============== 202-04050 Clean Exp Joint Lin Foot =============================================== NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 92.00 30.00 26.45 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 92.00 30.00 26.45 10.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 92.00 30.00 26.45 10.00 =============== 202-05006 Sawing Concrete (6 In) Lin Foot =============================================== STAR400-347 Various intersections across 04/12/18 99.00 35.00 39.37 40.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 99.00 35.00 39.37 40.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 99.00 35.00 39.37 40.10 =============== 202-05008 Sawing Concrete (8 In) Lin Foot =============================================== STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 38.00 150.00 22.62 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 38.00 150.00 22.62 20.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 38.00 150.00 22.62 20.00 =============== 202-05019 Sawing Concrete (Spec) Lin Foot =============================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 8,240.00 5.25 5.25 5.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8,240.00 5.25 5.25 5.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,240.00 5.25 5.25 5.25 =============== 202-05026 Sawing Asphalt Mat (6 In) Lin Foot =============================================== STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 568.00 7.30 7.00 10.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 568.00 7.30 7.00 10.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 65 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-05026 Sawing Asphalt Mat (6 In) Lin Foot =============================================== FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 60.00 3.00 11.00 10.64 STAR400-347 Various intersections across 04/12/18 74.00 20.00 40.84 43.51 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 2,894.00 4.00 2.55 2.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,028.00 4.37 3.44 3.81 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 3,469.00 3.50 2.82 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,469.00 3.50 2.82 3.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,065.00 4.18 3.36 3.95 =============== 202-05030 Sawing Asphalt Mat (10 In) Lin Foot =============================================== NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 504.00 20.00 6.04 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 504.00 20.00 6.04 5.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 52,500.00 3.31 3.31 3.31 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 52,500.00 3.31 3.31 3.31 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 132,673.00 3.15 3.15 3.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 132,673.00 3.15 3.15 3.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 185,677.00 3.24 3.23 3.20 =============== 202-05100 Sandblasting Reinf Steel Sq Yard ================================================ STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 2.00 40.00 2497.50 2400.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 66 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-05100 Sandblasting Reinf Steel Sq Yard ================================================ FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 349.00 25.00 15.61 27.75 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 414.00 25.00 22.20 11.44 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 289.00 25.00 20.41 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,054.00 25.03 21.51 26.46 NHPP0702-366 I-70 Avon to Vail 11/08/18 4.00 40.00 97.09 96.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 40.00 97.09 96.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,058.00 25.09 21.71 26.72 =============== 202-05150 Sandblasting Sq Foot ================================================ FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 5,000.00 2.50 2.78 3.96 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5,000.00 2.50 2.78 3.96 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,000.00 2.50 2.78 3.96 =============== 202-05300 Rem and Disposal of Paint LUMP SUM =============================================== FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 1.00 8000.00 3326.35 2500.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 1.00 10000.00 24375.78 489.27 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 1.00 125000.00 121318.75 60000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 47666.67 46697.41 20996.42 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 1.00 12400.00 17018.51 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 12400.00 17018.51 3000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 38850.00 39952.20 16497.32 =============== 202-06000 Rem Detour LUMP SUM =============================================== FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 1.00 40000.00 76111.11 85000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 40000.00 76111.11 85000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 40000.00 76111.11 85000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 67 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-06530 Clean Drain Pipe (Spec) Each =================================================== BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 5.00 530.00 2503.50 2139.26 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 530.00 2503.50 2139.26 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 530.00 2503.50 2139.26 =============== 203-00000 Uncl Excav Cubic Yard ============================================= FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 50.00 70.00 29.21 43.41 ER1151-033 PR SH 115-MP 34.7 01/25/18 5,500.00 18.00 13.86 1.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,550.00 18.47 13.92 1.38 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 2,750.00 25.00 30.67 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,750.00 25.00 30.67 14.00 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 22.00 50.00 108.12 44.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 22.00 50.00 108.12 44.00 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 747.00 25.00 67.00 35.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 510.00 40.00 47.69 13.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 53.00 35.00 104.96 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,310.00 31.24 59.54 25.83 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,632.00 22.14 27.58 8.41 =============== 203-00010 Uncl Excav (CIP) Cubic Yard ============================================= STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 75.00 15.00 152.50 140.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 68 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00010 Uncl Excav (CIP) Cubic Yard ============================================= STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 1,511.00 25.00 34.69 27.75 CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 4,747.00 51.44 60.00 60.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 8,570.00 18.00 25.51 16.21 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 387.00 50.00 36.10 31.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 44,227.00 17.00 25.53 10.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 617.00 40.00 33.75 36.00 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 25,823.00 31.41 39.00 39.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 1,210.00 25.00 30.00 44.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 87,167.00 23.80 26.95 23.09 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 2,624.00 15.00 45.70 35.00 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 3,794.00 40.00 15.00 15.00 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 2,859.00 10.00 13.13 11.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 130.00 20.00 46.30 55.21 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 826.00 75.00 116.00 116.00 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 24.00 140.00 305.00 140.00 ER055A-001 PR SH 55 FLOOD REPAIR 2015 06/28/18 8,833.00 11.00 15.37 5.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 19,090.00 20.16 18.88 17.56 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 1,185.00 50.00 89.39 61.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 793.00 33.50 27.92 21.50 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 5,099.00 20.00 10.50 10.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 2,402.00 30.00 22.88 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9,479.00 27.41 21.19 19.36 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 90.00 80.00 51.00 32.00 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 3,469.00 22.00 30.47 21.50 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 2,632.00 18.00 32.24 22.00 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 2,953.00 50.00 29.68 23.35 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 840.00 40.00 46.33 35.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 7,312.00 20.00 20.28 11.71 ER052A-039 SH 170 11/15/18 91.00 75.00 47.81 48.00 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 54.40 140.00 83.00 83.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 2.00 500.00 614.15 837.45 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 18,397.00 10.00 10.37 7.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 69 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00010 Uncl Excav (CIP) Cubic Yard ============================================= FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 23,020.00 25.00 20.51 15.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 58,860.40 20.95 19.91 13.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 174,596.40 22.64 23.28 19.17 =============== 203-00040 Uncl Excav (Spec) Cubic Yard ============================================= C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 30,769.00 12.39 12.39 12.39 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 30,769.00 12.39 12.39 12.39 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 12,319.00 18.69 18.69 18.69 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 12,319.00 18.69 18.69 18.69 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 43,088.00 14.19 14.19 14.19 =============== 203-00050 Unsuitable Material Cubic Yard ============================================= STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 250.00 50.00 57.15 48.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 65.00 25.00 92.11 60.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR ER144A-002 SH 144 East and West of Goodr 03/08/18 612.00 46.00 35.72 18.32 NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 207.00 20.00 35.60 15.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,134.00 40.93 40.51 26.67 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 10.00 40.00 69.78 13.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 40.00 69.78 13.20 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 2,500.00 34.86 34.86 34.86 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,500.00 34.86 34.86 34.86 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 70 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00050 Unsuitable Material Cubic Yard ============================================= BR1131-006 SH 113 AT MP 11.5 10/11/18 100.00 30.00 38.26 50.00 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 500.00 38.00 54.54 40.00 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 35.00 50.00 74.41 68.81 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 3,350.00 35.18 35.19 35.19 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 915.00 15.00 29.71 15.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 2,000.00 48.30 48.30 48.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6,900.00 36.51 38.15 37.05 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10,544.00 36.60 38.68 35.39 =============== 203-00060 Emb Matl (CIP) Cubic Yard ============================================= FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 40.00 50.00 121.68 68.35 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 2,575.00 16.75 36.33 29.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 440.00 50.00 55.55 30.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 10,679.00 15.00 21.10 30.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 6,495.00 20.00 23.35 14.00 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 778.00 60.00 47.43 25.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 1,142.00 60.00 62.86 52.86 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 5,744.00 25.00 53.60 42.00 ER144A-002 SH 144 East and West of Goodr 03/08/18 72,857.00 15.00 15.74 7.49 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 307.00 35.00 56.70 45.39 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 101,057.00 17.02 18.67 13.68 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 8,911.00 25.00 14.00 13.14 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 97.00 26.00 9.67 15.00 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 1,603.00 17.50 10.00 5.00 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 20,771.00 26.00 13.50 11.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 1,289.00 35.00 55.06 41.86 FBR0705-087 I-70: EMERGENCY BRIDGE G-25-K 05/16/18 48,000.00 19.00 19.00 19.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 80,671.00 21.70 17.09 16.38 FBR060A-022 SH 60 over the South Platte 07/12/18 28,222.00 9.50 17.18 12.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 71 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00060 Emb Matl (CIP) Cubic Yard ============================================= STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 883.00 20.00 45.88 15.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 44,456.00 11.15 11.15 11.15 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 6.00 200.00 205.58 200.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 14,784.00 10.00 12.76 12.00 STA052A-040 SH 52: Antelope Creek 08/23/18 973.00 25.00 45.42 35.50 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 51.00 40.00 80.63 90.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 10,424.00 15.00 21.03 21.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 13.00 150.00 71.25 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 99,812.00 11.17 17.00 12.87 BR1131-006 SH 113 AT MP 11.5 10/11/18 2,247.00 13.50 33.03 14.77 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 1,122.00 26.00 65.48 115.97 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 25,242.00 20.00 25.50 18.99 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 357.00 40.00 36.89 21.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 840.00 45.00 112.75 230.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 52,992.00 9.00 18.31 15.54 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 20,397.00 34.12 34.11 34.11 C R500-198 R5 GUARDRAIL REPLACEMENT/UPGR 11/29/18 5.00 75.00 280.00 85.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 2,004.00 35.00 37.49 42.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 1,543.00 30.00 55.54 40.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 35.00 150.00 82.42 50.00 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 6,752.00 14.00 30.00 28.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 397,958.00 12.00 12.00 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 511,494.00 13.26 18.89 14.61 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 793,034.00 14.33 18.18 14.46 =============== 203-00062 Emb Matl (CIP) (Spec) Cubic Yard ============================================= ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 602.00 17.00 31.01 32.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 602.00 17.00 31.01 32.00 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 3,932.00 25.00 25.95 27.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,932.00 25.00 25.95 27.42 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 108,944.00 19.60 19.60 19.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 108,944.00 19.60 19.60 19.60 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 72 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00062 Emb Matl (CIP) (Spec) Cubic Yard ============================================= ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 1,200.00 50.00 24.35 12.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,200.00 50.00 24.35 12.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 114,678.00 20.09 21.63 19.86 =============== 203-00065 Emb Matl (CIP) (R20) Cubic Yard ============================================= NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 200.00 25.00 112.50 40.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 37.00 125.00 101.88 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 237.00 40.61 109.63 49.37 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 14,719.00 12.00 16.93 11.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 14,719.00 12.00 16.93 11.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14,956.00 12.45 17.79 11.85 =============== 203-00066 Emb Matl (CIP) (R40) Cubic Yard ============================================= ER1151-033 PR SH 115-MP 34.7 01/25/18 5,500.00 20.00 18.57 1.10 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,500.00 20.00 18.57 1.10 FBR060A-022 SH 60 over the South Platte 07/12/18 8,581.00 14.00 17.59 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8,581.00 14.00 17.59 12.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 4,155.00 25.00 33.65 25.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,155.00 25.00 33.65 25.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18,236.00 18.32 21.10 11.82 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 73 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00100 Muck Excav Cubic Yard ============================================= NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 2,661.00 25.00 41.88 40.00 ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 995.00 40.00 35.49 11.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 351.00 40.00 47.22 41.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 400.00 40.00 44.00 28.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,407.00 30.94 39.94 32.44 FBR060A-022 SH 60 over the South Platte 07/12/18 2,000.00 32.00 28.49 33.00 C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 250.00 30.00 66.50 85.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 200.00 42.00 34.39 33.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 25.00 40.00 102.03 60.00 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 1,000.00 40.00 35.50 22.00 STM0252-469 R2 ADA RAMPS I-25 INT S NEV- 09/06/18 20.00 26.00 132.50 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,495.00 34.74 31.36 34.72 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 50.00 20.00 98.00 50.00 C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 250.00 70.00 38.60 35.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 1,000.00 25.00 24.41 15.72 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,300.00 33.46 30.98 20.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,202.00 32.74 34.74 31.66 =============== 203-00210 Borrow (CIP) Cubic Yard ============================================= NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 338.00 33.00 27.83 33.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 39,933.00 19.86 19.86 19.86 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 40,271.00 19.97 20.25 19.97 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 9,666.00 30.14 30.14 30.14 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9,666.00 30.14 30.14 30.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 49,937.00 21.94 22.10 21.94 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 74 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00400 Rock Excav Cubic Yard ============================================= ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 4,650.00 55.00 34.84 20.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 10.00 100.00 330.89 421.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,660.00 55.10 34.99 20.86 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 1,400.00 35.00 30.00 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,400.00 35.00 30.00 25.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,060.00 50.45 34.20 21.82 =============== 203-00440 Rock Excav (Spec) Cubic Yard ============================================= ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 200.00 95.00 74.11 60.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 200.00 95.00 74.11 60.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 200.00 95.00 74.11 60.00 =============== 203-00510 Rock Fill (Spec) Cubic Yard ============================================= ER144A-002 SH 144 East and West of Goodr 03/08/18 26,158.00 75.00 75.71 65.57 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 26,158.00 75.00 75.71 65.57 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26,158.00 75.00 75.71 65.57 =============== 203-00599 Rock Scaler Hour =================================================== STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 144.00 150.00 263.50 285.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 144.00 150.00 263.50 285.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 144.00 150.00 263.50 285.00 =============== 203-01100 Proof Rolling Hour =================================================== STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 20.00 120.00 103.25 100.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 75 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01100 Proof Rolling Hour =================================================== CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 12.00 160.57 100.00 100.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 40.00 122.00 117.88 87.57 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 20.00 138.37 100.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 92.00 130.15 113.43 94.60 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 40.00 130.00 129.38 220.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 40.00 130.00 129.38 220.00 FBR060A-022 SH 60 over the South Platte 07/12/18 40.00 110.00 122.46 80.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 200.00 152.25 152.25 152.25 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 20.00 109.00 84.35 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 260.00 142.42 120.57 135.58 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 12.00 100.00 147.15 135.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 20.00 100.00 148.27 129.47 STA052A-045 SH 52B NEW RAYMER SOUTH 12/13/18 40.00 130.00 88.67 85.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 200.00 152.25 152.25 152.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 272.00 142.83 134.31 139.92 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 664.00 140.14 123.66 136.77 =============== 203-01140 Rolling Hour =================================================== STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 20.00 100.00 100.00 100.00 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 20.00 130.00 121.13 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 40.00 115.00 116.90 100.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 20.00 120.00 136.74 130.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 40.00 90.00 101.83 100.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 76 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01140 Rolling Hour =================================================== STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 20.00 90.00 94.10 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 80.00 97.50 110.79 102.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 120.00 103.33 112.49 101.83 =============== 203-01500 Blading Hour =================================================== STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 50.00 170.00 153.27 170.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 20.00 140.00 148.03 100.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 20.00 125.00 135.50 92.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 96.00 151.00 146.99 125.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 70.00 145.00 172.50 155.00 CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 12.00 246.77 188.00 188.00 STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 40.00 150.00 125.00 125.00 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 48.00 135.00 144.89 170.00 ER1151-033 PR SH 115-MP 34.7 01/25/18 52.00 116.92 172.03 165.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 20.00 148.00 170.61 189.55 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 20.00 130.00 159.42 128.35 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 70.00 140.00 137.81 130.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 24.00 130.00 160.55 125.00 ER144A-002 SH 144 East and West of Goodr 03/08/18 250.00 145.00 157.34 150.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 60.00 140.00 176.28 125.00 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 20.00 230.70 100.00 100.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 10.00 175.00 130.00 130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 882.00 146.78 157.15 142.79 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 60.00 150.00 167.90 125.00 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 25.00 150.00 138.19 107.45 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 40.00 134.00 134.50 100.00 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 190.00 150.00 120.00 100.00 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 20.00 135.00 130.43 91.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 10.00 150.00 150.32 161.29 MTCE R100-312 R1 CHIP SEAL 05/17/18 35.00 146.83 250.00 250.00 ER055A-001 PR SH 55 FLOOD REPAIR 2015 06/28/18 140.00 130.00 149.64 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 520.00 142.59 146.22 120.90 FBR060A-022 SH 60 over the South Platte 07/12/18 16.00 125.00 148.19 125.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 77 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01500 Blading Hour =================================================== STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 30.00 130.00 161.75 87.50 STA052A-040 SH 52: Antelope Creek 08/23/18 30.00 127.00 140.83 125.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 70.00 150.00 89.69 120.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 40.00 134.00 155.37 180.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 186.00 137.47 139.21 128.90 BR1131-006 SH 113 AT MP 11.5 10/11/18 40.00 115.00 153.12 100.00 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 20.00 140.00 109.00 125.00 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 10.00 145.00 140.56 123.47 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 50.00 145.00 127.62 150.87 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 12.00 140.00 166.07 190.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 40.00 135.00 167.29 130.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 60.00 135.00 158.80 155.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 40.00 150.00 144.37 102.60 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 40.00 150.00 130.56 121.11 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 3.00 200.00 138.67 100.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 30.00 135.00 155.51 127.05 ER052A-039 SH 170 11/15/18 10.00 140.00 155.17 133.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 40.00 207.87 207.90 207.90 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 20.00 150.00 109.60 125.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 20.00 160.00 148.00 140.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 40.00 120.00 113.58 150.75 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 100.00 110.00 181.44 137.00 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 20.00 130.00 125.68 110.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 200.00 140.00 125.96 115.24 STA052A-045 SH 52B NEW RAYMER SOUTH 12/13/18 150.00 150.00 166.00 143.00 STAR100-279 FY20 HMA PREVENTATIVE MAINTEN 12/13/18 70.00 150.00 175.00 175.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,015.00 141.13 149.79 136.69 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,603.00 143.08 150.96 135.05 =============== 203-01510 Backhoe Hour =================================================== STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 10.00 150.00 129.28 85.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 36.00 135.00 141.38 125.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 20.00 150.00 124.50 110.00 CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 12.00 284.05 210.00 210.00 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 48.00 125.00 146.95 160.00 ER1151-033 PR SH 115-MP 34.7 01/25/18 24.00 100.00 133.69 155.00 ER1151-034 PR SH 115-MP 40.5 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 78 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01510 Backhoe Hour =================================================== NH0242-086 PR US24 MONTESSORI WALL MP 29 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 20.00 140.00 135.80 125.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 20.00 160.00 155.10 83.24 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 20.00 140.00 129.04 115.48 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 70.00 140.00 126.18 160.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 24.00 140.00 126.76 90.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 140.00 165.00 129.88 97.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 16.00 150.00 90.67 90.00 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 20.00 293.51 200.00 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 480.00 155.21 133.62 125.68 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 60.00 150.00 162.80 166.00 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 25.00 130.00 132.23 113.45 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 40.00 163.00 140.50 50.00 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 190.00 120.00 115.00 50.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 40.00 140.00 141.88 137.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 355.00 132.87 137.31 83.93 FBR060A-022 SH 60 over the South Platte 07/12/18 16.00 100.00 116.47 85.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 20.00 150.00 157.21 87.50 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 100.00 199.50 199.50 199.50 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 10.00 185.00 225.00 200.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 60.00 140.00 134.49 115.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 50.00 160.00 88.28 140.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 40.00 163.00 148.36 150.00 STMR200-246 R2–2018 CRITICAL CULVERTS REP 09/20/18 40.00 125.00 110.00 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 336.00 161.67 136.75 146.90 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 10.00 150.00 83.50 90.00 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 20.00 150.00 109.26 83.30 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 12.00 125.00 138.62 118.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 250.00 160.00 198.74 265.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 40.00 106.60 106.62 106.62 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 20.00 125.00 149.86 138.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 100.00 120.00 148.63 63.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 79 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01510 Backhoe Hour =================================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 100.00 200.90 200.90 200.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 552.00 153.72 175.14 187.86 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,723.00 151.39 144.96 141.14 =============== 203-01515 Backhoe (Landscaping) Hour =================================================== NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 20.00 200.00 117.50 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 200.00 117.50 75.00 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 32.00 135.00 136.67 180.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 32.00 135.00 136.67 180.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 52.00 160.00 127.95 139.62 =============== 203-01549 Pump Hour =================================================== NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 40.00 250.00 315.00 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 40.00 250.00 315.00 300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 250.00 315.00 300.00 =============== 203-01550 Dozing Hour =================================================== NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 10.00 150.00 187.50 190.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 36.00 180.00 152.29 115.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 20.00 180.00 163.75 135.00 ER1151-033 PR SH 115-MP 34.7 01/25/18 24.00 120.00 176.25 250.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 20.00 200.00 196.65 150.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 20.00 175.00 198.52 299.83 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 20.00 200.00 178.70 159.94 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 50.00 150.00 188.43 150.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 80 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01550 Dozing Hour =================================================== FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 24.00 200.00 157.05 110.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 140.00 175.00 148.88 103.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 200.00 175.00 177.51 150.00 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 20.00 225.06 110.00 110.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 10.00 130.00 140.00 130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 594.00 174.35 169.34 143.09 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 60.00 190.00 198.60 228.50 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 25.00 130.00 160.55 134.45 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 40.00 120.00 195.00 170.00 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 40.00 193.00 149.00 100.00 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 80.00 150.00 140.00 100.00 ER055A-001 PR SH 55 FLOOD REPAIR 2015 06/28/18 150.00 135.00 154.82 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 395.00 150.43 160.74 138.28 FBR060A-022 SH 60 over the South Platte 07/12/18 16.00 130.00 159.59 110.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 20.00 150.00 188.59 87.50 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 40.00 150.00 121.77 145.30 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 50.00 170.00 99.84 135.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 40.00 193.00 163.62 180.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 166.00 164.46 149.84 140.19 BR1131-006 SH 113 AT MP 11.5 10/11/18 40.00 150.00 162.41 100.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 50.00 150.00 197.70 208.10 NHPP0702-366 I-70 Avon to Vail 11/08/18 60.00 190.00 228.55 285.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 3.00 200.00 142.17 95.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 40.00 142.85 142.86 142.86 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 100.00 180.00 161.04 99.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 293.00 167.97 178.01 161.79 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,448.00 165.40 165.72 145.23 =============== 203-01555 Dozing (Landscaping) Hour =================================================== NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 10.00 220.00 160.00 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 220.00 160.00 90.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 220.00 160.00 90.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 81 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01582 Truck (Dump) Hour =================================================== STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 10.00 120.00 114.25 125.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 20.00 115.00 107.50 85.00 CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 12.00 153.51 135.00 135.00 STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 40.00 115.00 100.00 100.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 20.00 100.00 113.05 81.75 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 20.00 120.00 113.10 100.00 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 20.00 143.51 100.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 142.00 121.21 110.84 100.04 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 60.00 120.00 118.05 106.25 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 20.00 120.00 102.98 85.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 80.00 120.00 114.88 100.94 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 30.00 100.00 113.82 87.50 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 10.00 300.00 192.50 135.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 40.00 150.00 120.66 99.38 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 10.00 120.00 102.50 120.00 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 20.00 155.00 113.04 137.34 NHPP0702-366 I-70 Avon to Vail 11/08/18 360.00 115.00 128.13 125.00 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 10.00 85.00 138.44 156.88 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 40.00 117.27 117.27 117.27 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 440.00 116.46 126.91 125.47 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 702.00 119.73 122.09 116.04 =============== 203-01590 Front End Loader (Rubber) Hour =================================================== NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 20.00 150.00 125.50 97.00 CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 12.00 210.80 160.00 160.00 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 120.00 175.00 128.20 150.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 82 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01590 Front End Loader (Rubber) Hour =================================================== ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 20.00 197.07 100.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 172.00 177.16 127.64 138.72 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 30.00 150.00 183.00 248.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 30.00 150.00 183.00 248.50 FBR060A-022 SH 60 over the South Platte 07/12/18 40.00 100.00 127.90 120.00 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 20.00 175.00 118.75 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 60.00 125.00 126.59 121.67 NHPP0702-366 I-70 Avon to Vail 11/08/18 330.00 135.00 183.18 165.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 330.00 135.00 183.18 165.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 592.00 146.99 157.19 157.20 =============== 203-01594 Combination Loader Hour =================================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 20.00 100.00 102.25 104.50 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 30.00 120.00 111.75 97.00 STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 20.00 125.00 85.00 85.00 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 48.00 125.00 122.06 110.00 ER1151-033 PR SH 115-MP 34.7 01/25/18 40.00 100.00 122.49 115.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 20.00 145.00 140.22 95.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 20.00 155.00 123.67 104.43 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 90.00 130.00 122.33 120.00 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 14.00 150.00 110.00 100.00 NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 16.00 150.00 146.04 99.24 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 20.00 120.00 156.21 142.41 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 20.00 137.79 100.00 100.00 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 4.00 150.00 160.58 245.73 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 362.00 127.23 123.24 111.02 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 83 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01594 Combination Loader Hour =================================================== FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 25.00 125.00 111.57 92.45 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 40.00 120.00 98.30 75.00 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 80.00 110.00 80.00 75.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 40.00 140.00 109.00 126.50 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 60.00 110.00 132.31 97.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 20.00 150.00 230.00 230.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 265.00 120.47 110.58 101.10 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 50.00 100.00 130.72 87.50 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 40.00 125.00 131.67 145.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 40.00 140.00 113.23 139.70 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 40.00 154.00 112.07 110.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 60.00 150.00 111.60 85.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 20.00 110.00 89.69 120.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 40.00 120.00 124.07 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 290.00 130.21 119.40 116.08 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 20.00 150.00 111.21 93.64 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 150.00 130.00 128.67 102.60 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 20.00 120.00 109.72 99.44 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 200.00 160.00 127.00 74.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 20.00 125.00 127.79 111.32 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 4.00 150.00 155.00 155.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 40.00 127.93 127.94 127.94 C R500-198 R5 GUARDRAIL REPLACEMENT/UPGR 11/29/18 20.00 140.00 132.50 165.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 20.00 125.00 118.03 149.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 100.00 100.00 112.57 64.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 594.00 135.38 124.07 92.08 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,511.00 129.82 120.35 102.80 =============== 203-01597 Potholing Hour =================================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 20.00 300.00 450.61 601.21 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 84 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01597 Potholing Hour =================================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 40.00 200.00 260.00 240.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 20.00 250.00 266.67 225.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 100.00 250.00 288.13 350.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 80.00 240.00 265.00 320.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 30.00 220.00 229.60 225.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR MTCER100-296 MTCE R1 FY18 WEST SIGN REPLAC 01/11/18 40.00 234.00 248.50 200.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 50.00 235.00 288.75 290.00 CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 6.00 350.89 263.00 263.00 ITSSW01-833 ABOUT 1.5 MILES NORTH OF THE 01/18/18 20.00 250.00 206.25 190.00 STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 20.00 250.00 360.00 360.00 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 40.00 205.00 224.72 270.00 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 16.00 125.00 276.34 215.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 10.00 230.00 278.50 299.50 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 24.00 125.00 259.32 288.85 C0703-440 AVALANCHE CONTROL SYSTEM: EJM 02/01/18 10.00 300.00 264.78 225.00 STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 200.00 250.00 120.00 140.00 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 40.00 400.00 300.31 240.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 24.00 225.00 254.79 275.00 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 8.00 220.00 220.00 215.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 100.00 220.00 320.38 303.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 24.00 200.00 208.86 226.25 NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 40.00 300.00 934.00 325.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 40.00 200.00 268.22 250.00 MTCER500-201 R5 FY18 SIGN REPLACEMENT 03/08/18 20.00 250.00 131.43 200.00 NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 16.00 200.00 361.67 260.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 12.00 200.00 337.94 325.87 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 10.00 328.04 250.00 250.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 80.00 200.00 257.50 215.00 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 10.00 200.00 246.67 234.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,150.00 237.70 273.52 255.42 NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPL 04/05/18 40.00 225.00 207.67 158.00 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 16.00 250.00 263.27 323.13 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 40.00 210.00 186.67 200.00 STAR400-347 Various intersections across 04/12/18 260.00 200.00 160.00 5.00 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 20.00 230.00 242.50 250.00 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 120.00 200.00 205.00 250.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 20.00 250.00 269.16 352.00 STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 30.00 200.00 211.25 235.00 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 60.00 220.00 271.25 325.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 50.00 200.00 191.33 175.33 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 40.00 500.00 610.00 610.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 85 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01597 Potholing Hour =================================================== STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 30.00 200.00 288.75 162.50 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 40.00 250.00 323.33 290.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 766.00 224.80 220.35 181.49 NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 40.00 220.00 250.00 250.00 FBR060A-022 SH 60 over the South Platte 07/12/18 100.00 175.00 240.58 235.00 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 80.00 300.00 294.92 344.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 16.00 200.00 285.14 250.00 SHE0701-245 I-70 MEDIAN CABLE RAIL INSTAL 07/12/18 24.00 250.00 200.00 200.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 40.00 200.00 202.83 185.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 130.00 280.00 290.97 312.90 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 600.00 272.32 272.32 272.32 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 10.00 660.00 289.29 310.00 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 80.00 200.00 232.50 200.00 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 120.00 250.00 226.60 235.70 C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 20.00 220.00 234.50 193.00 STA052A-040 SH 52: Antelope Creek 08/23/18 8.00 220.00 245.83 215.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 60.00 170.00 242.97 240.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 40.00 255.00 216.05 150.00 STM0252-469 R2 ADA RAMPS I-25 INT S NEV- 09/06/18 40.00 215.00 225.00 150.00 NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 40.00 215.00 225.00 225.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 40.00 230.00 254.31 200.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 20.00 200.00 224.50 190.00 NHPP070A-032 I-70B & Z GRAND JCT PHASE 1 A 09/20/18 40.00 220.00 162.50 75.00 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 40.00 650.00 215.00 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,588.00 259.23 249.17 243.99 NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 10.00 250.00 254.50 190.00 BR1131-006 SH 113 AT MP 11.5 10/11/18 10.00 200.00 243.00 87.50 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 48.00 225.00 170.25 246.00 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 40.00 250.00 267.50 225.00 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 20.00 240.00 335.76 300.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 40.00 255.00 276.88 230.65 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 60.00 200.00 285.24 255.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 90.00 230.00 322.56 440.00 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 8.00 500.00 293.75 327.50 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 500.00 250.00 253.33 175.00 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 200.00 200.00 154.71 10.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 24.00 250.00 277.50 185.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 20.00 200.00 255.43 175.45 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 86 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01597 Potholing Hour =================================================== ER052A-039 SH 170 11/15/18 20.00 250.00 269.72 318.00 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 20.00 400.00 125.00 125.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 50.00 362.44 303.85 303.85 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 100.00 200.00 234.04 213.17 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 40.00 210.00 185.00 50.00 C R500-198 R5 GUARDRAIL REPLACEMENT/UPGR 11/29/18 50.00 400.00 292.50 200.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 4.00 250.00 355.91 250.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 80.00 220.00 268.67 200.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 20.00 250.00 211.13 175.88 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 100.00 200.00 225.77 180.00 C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 20.00 220.00 214.80 229.00 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 12.00 250.00 333.13 220.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 100.00 220.00 245.99 246.74 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 100.00 200.00 165.00 160.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1,200.00 209.87 209.87 209.87 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,986.00 226.51 233.42 197.39 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,490.00 236.30 245.66 217.20 =============== 203-01620 Sweeping Hour =================================================== STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 20.00 100.00 125.00 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 100.00 125.00 125.00 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 15.00 100.00 194.38 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 15.00 100.00 194.38 125.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 35.00 100.00 179.78 125.00 =============== 203-01622 Sweeping (With Pickup Broom) Hour =================================================== NHPP0702-373 I-70 GWC Longitudinal Joint R 01/11/18 40.00 154.00 210.00 245.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 20.00 125.00 170.29 147.13 NHPP5502-096 US550 STRIPING & RUMBLE STRIP 03/01/18 60.00 100.00 195.00 380.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 120.00 122.17 190.09 296.19 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 20.00 200.00 237.00 162.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 87 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01622 Sweeping (With Pickup Broom) Hour =================================================== STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 20.00 150.00 144.06 170.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 40.00 175.00 199.83 166.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 50.00 300.00 185.43 256.28 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 50.00 300.00 185.43 256.28 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 210.00 174.57 191.63 261.89 =============== 203-02300 Rock Scaler Hour =================================================== ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 230.00 125.00 237.06 280.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 230.00 125.00 237.06 280.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 230.00 125.00 237.06 280.00 =============== 203-02330 Laborer Hour =================================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 20.00 55.00 49.09 48.17 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 40.00 60.00 44.00 31.00 NHPP0702-373 I-70 GWC Longitudinal Joint R 01/11/18 40.00 100.00 43.75 37.50 MTCER100-296 MTCE R1 FY18 WEST SIGN REPLAC 01/11/18 20.00 43.00 47.75 5.00 CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 40.00 60.34 65.00 65.00 STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 40.00 60.00 40.00 40.00 ER1151-033 PR SH 115-MP 34.7 01/25/18 164.00 41.46 46.23 46.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 40.00 52.00 43.64 30.85 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 40.00 100.00 46.24 53.43 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 90.00 70.00 54.56 60.00 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 40.00 50.00 39.25 45.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 140.00 45.00 41.63 35.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 20.00 80.00 51.34 31.10 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 10.00 40.00 49.91 52.00 NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 40.00 45.00 41.00 45.00 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 40.00 56.41 65.00 65.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 10.00 45.00 54.50 54.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 834.00 56.55 45.45 44.49 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 88 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-02330 Laborer Hour =================================================== STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 80.00 50.00 70.40 80.00 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 40.00 40.00 35.75 29.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 40.00 50.00 40.18 35.20 STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 8.00 50.00 71.75 42.00 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 60.00 50.00 50.43 31.00 MTCE R100-312 R1 CHIP SEAL 05/17/18 25.00 52.00 50.00 50.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 40.00 60.00 76.00 76.00 NHPP0703-436 EJMT PLENUM WATERPROOFING MEM 06/28/18 10.00 100.00 72.00 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 303.00 51.82 53.48 52.98 FBR060A-022 SH 60 over the South Platte 07/12/18 16.00 50.00 49.86 75.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 20.00 40.00 49.31 37.50 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 80.00 50.00 51.33 55.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 100.00 65.00 49.07 60.20 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 100.00 48.62 48.62 48.62 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 80.00 40.00 58.32 40.00 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 30.00 75.00 72.50 70.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 60.00 45.00 42.60 36.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 16.00 15.00 41.56 50.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 40.00 40.00 44.43 36.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 542.00 49.73 48.77 49.69 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 12.00 50.00 49.56 42.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 80.00 45.00 61.95 86.00 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 40.00 60.00 48.18 36.35 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 40.00 50.00 50.93 48.40 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 16.00 25.00 35.00 35.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 100.00 41.57 47.97 47.97 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 20.00 45.00 41.00 45.00 C R500-198 R5 GUARDRAIL REPLACEMENT/UPGR 11/29/18 20.00 65.00 50.00 30.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 60.00 50.00 45.15 50.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 40.00 30.00 44.25 50.25 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 12.00 30.00 51.34 50.00 STAR100-279 FY20 HMA PREVENTATIVE MAINTEN 12/13/18 50.00 75.00 40.00 50.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 100.00 51.04 51.04 51.04 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 590.00 48.76 49.46 52.28 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,269.00 52.26 48.26 48.89 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 89 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00000 Str Excav Cubic Yard ============================================= SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 76.00 25.00 35.33 30.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 224.00 40.00 56.63 75.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 1,546.00 19.00 14.84 10.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 1,535.00 40.00 21.12 5.50 CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 931.00 62.78 100.00 100.00 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 56.00 100.00 200.93 25.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 67.00 35.00 61.15 89.82 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 1,879.00 20.00 54.58 47.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 128.00 50.00 58.55 30.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 7,440.00 18.00 25.06 25.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 880.00 30.00 32.71 32.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 212.00 20.00 49.77 34.53 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 80.00 25.00 20.00 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15,054.00 25.15 28.36 30.47 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 258.00 30.00 20.37 17.88 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 12,217.00 20.00 16.33 15.00 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 401.00 35.50 27.55 25.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 170.00 150.00 30.98 15.40 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 387.00 40.00 32.75 22.00 FBR0705-087 I-70: EMERGENCY BRIDGE G-25-K 05/16/18 467.00 23.00 23.00 23.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 16.00 50.00 230.00 230.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 13,916.00 22.91 18.48 16.06 FBR060A-022 SH 60 over the South Platte 07/12/18 781.00 25.00 17.53 5.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 920.00 30.00 38.01 15.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 5,751.00 14.70 14.70 14.70 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 198.00 45.00 83.41 20.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 4,304.00 25.00 18.58 18.00 M850-027 US24E MANITOU AVE. AT RUXTON 08/28/18 780.00 50.00 69.73 28.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 610.00 25.00 24.64 20.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 1,301.00 35.00 15.99 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 14,645.00 23.76 21.94 16.47 BR1131-006 SH 113 AT MP 11.5 10/11/18 1,315.00 18.00 18.40 15.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 90 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00000 Str Excav Cubic Yard ============================================= FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 35.00 45.00 85.92 120.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 3.00 20.00 212.65 550.00 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 51.00 75.00 48.11 36.22 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 1,731.00 35.00 37.17 45.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 449.00 14.00 27.19 23.95 ER052A-039 SH 170 11/15/18 670.00 35.00 42.84 40.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 2,509.00 17.06 17.06 17.06 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 123.00 70.00 73.00 35.00 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 256.00 20.00 68.00 51.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 388.00 27.00 33.29 10.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 1,573.00 22.00 27.39 16.50 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 753.00 15.00 29.71 30.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 560.00 26.00 40.80 22.42 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 664.00 10.00 25.93 27.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 39,770.00 15.54 15.54 15.54 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 50,850.00 17.14 23.71 17.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 94,465.00 20.29 23.95 19.34 =============== 206-00050 Str Bkfl (Spec) Cubic Yard ============================================= NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1,424.00 86.14 86.14 86.14 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,424.00 86.14 86.14 86.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,424.00 86.14 86.14 86.14 =============== 206-00060 Str Bkfl (Spec) (Flow-Fill) Cubic Yard ============================================= NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 38.00 120.00 240.51 161.02 STA086A-051 SH 86; WEST OF I-70 11/29/18 23.00 250.00 585.07 900.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 17.00 500.00 214.42 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 78.00 241.15 402.83 365.63 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 78.00 241.15 402.83 365.63 =============== 206-00065 Str Bkfl (Flow-Fill) Cubic Yard ============================================= ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 21.00 205.00 270.84 200.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 91 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00065 Str Bkfl (Flow-Fill) Cubic Yard ============================================= ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 39.00 200.00 256.96 220.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 356.00 180.00 219.28 145.53 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 14.00 200.00 296.75 205.37 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 33.00 300.00 635.10 420.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 463.00 191.98 260.33 175.65 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 28.00 220.00 258.33 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 28.00 220.00 258.33 150.00 FBR060A-022 SH 60 over the South Platte 07/12/18 10.00 240.00 315.78 325.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 4.00 220.00 751.43 700.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 446.00 150.00 193.15 170.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 460.00 152.57 197.84 177.98 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 100.00 350.00 265.00 295.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 201.00 190.00 167.62 131.72 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 111.00 207.87 207.90 207.90 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 43.00 200.00 411.87 410.47 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 2.00 300.00 4075.00 650.00 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 152.00 600.00 462.66 500.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 151.00 200.00 199.87 208.00 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 6.00 205.00 183.00 180.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 176.00 290.85 290.85 290.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 942.00 296.48 262.74 273.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,893.00 234.82 235.29 224.55 =============== 206-00100 Str Bkfl (CL 1) Cubic Yard ============================================= NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 216.00 55.00 84.75 90.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 285.00 40.00 40.82 35.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 92 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00100 Str Bkfl (CL 1) Cubic Yard ============================================= ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 1,485.00 40.00 51.90 45.00 CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 1,235.00 161.51 260.00 260.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 94.00 60.00 117.52 75.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 13,255.00 35.00 39.65 36.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 500.00 42.00 87.67 65.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 94.00 35.00 86.65 63.30 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 25.00 30.00 54.00 48.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 17,189.00 45.19 45.33 54.76 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 836.00 48.00 37.85 37.14 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 2,670.00 26.00 27.33 15.00 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 396.00 35.20 50.68 65.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 280.00 100.00 80.36 48.40 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 53.00 40.00 49.50 73.00 FBR0705-087 I-70: EMERGENCY BRIDGE G-25-K 05/16/18 675.00 45.00 45.00 45.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 16.00 50.00 175.00 175.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4,926.00 37.51 40.03 29.93 FBR060A-022 SH 60 over the South Platte 07/12/18 585.00 40.00 43.51 35.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 360.00 50.00 68.97 54.86 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 9,123.00 36.07 36.07 36.07 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 104.00 85.00 126.79 87.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 1,615.00 60.00 34.30 32.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 260.00 55.00 60.28 45.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 387.00 50.00 44.95 47.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12,434.00 41.01 41.54 36.99 BR1131-006 SH 113 AT MP 11.5 10/11/18 766.00 37.00 43.00 20.69 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 6.00 75.00 107.12 60.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 124.00 45.00 72.58 38.64 ER052A-039 SH 170 11/15/18 180.00 70.00 87.94 43.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 2,169.00 93.81 93.83 93.83 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 103.00 100.00 115.00 45.00 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 256.00 27.00 94.75 89.50 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 253.00 65.00 64.15 42.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 93 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00100 Str Bkfl (CL 1) Cubic Yard ============================================= STA086A-051 SH 86; WEST OF I-70 11/29/18 5.00 46.00 303.33 225.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 413.00 58.00 63.81 54.76 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 547.00 45.00 53.43 44.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 40,319.00 44.52 44.52 44.52 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 45,141.00 47.14 50.06 46.81 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 79,690.00 45.17 45.39 45.95 =============== 206-00200 Str Bkfl (CL 2) Cubic Yard ============================================= CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 36.00 105.38 275.00 275.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 63.00 45.00 71.00 8.72 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 165.00 40.00 43.07 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 264.00 50.11 54.57 77.08 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 35.00 60.00 90.04 48.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 35.00 60.00 90.04 48.40 FBR060A-022 SH 60 over the South Platte 07/12/18 76.00 35.00 30.04 50.00 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 36.00 96.00 112.79 36.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 940.00 50.00 24.85 32.00 M850-027 US24E MANITOU AVE. AT RUXTON 08/28/18 485.00 70.00 92.96 81.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 173.00 35.00 33.49 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,710.00 54.46 36.61 45.77 BR1131-006 SH 113 AT MP 11.5 10/11/18 39.00 35.00 39.20 20.69 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 393.00 29.86 29.85 29.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 432.00 30.32 34.51 29.02 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,441.00 49.80 39.38 46.23 =============== 206-00360 Mechanical Reinforcement of Soil Cubic Yard ============================================= CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 1,235.00 36.32 40.00 40.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 94 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00360 Mechanical Reinforcement of Soil Cubic Yard ============================================= ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 2,725.00 17.00 47.52 32.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 500.00 25.00 27.81 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,460.00 23.25 44.26 34.55 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 655.00 50.00 32.76 16.03 FBR0705-087 I-70: EMERGENCY BRIDGE G-25-K 05/16/18 540.00 24.00 24.00 24.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,195.00 38.25 32.10 19.63 FBR060A-022 SH 60 over the South Platte 07/12/18 454.00 25.00 35.52 4.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 5,648.00 24.11 24.11 24.11 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 1,615.00 30.00 22.98 19.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 260.00 55.00 38.63 44.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7,977.00 26.36 26.53 22.58 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1,697.00 38.38 38.38 38.38 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 61.00 60.00 98.40 60.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 20,218.00 8.88 8.88 8.88 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 21,976.00 11.30 12.36 11.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 35,608.00 17.07 28.92 17.02 =============== 206-00510 Filter Matl (CL A) Cubic Yard ============================================= NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 553.00 150.00 96.75 105.00 ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 165.00 95.00 96.98 82.00 ER1151-033 PR SH 115-MP 34.7 01/25/18 329.00 75.00 80.75 70.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 3.00 150.00 183.11 27.25 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 2.00 300.00 330.59 300.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 1,437.00 75.00 89.56 60.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 95 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00510 Filter Matl (CL A) Cubic Yard ============================================= STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 63.00 50.00 109.48 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,552.00 92.19 91.36 74.59 BR1131-006 SH 113 AT MP 11.5 10/11/18 46.00 60.00 101.98 70.83 ER052A-039 SH 170 11/15/18 25.00 90.00 109.72 78.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 265.00 97.01 97.02 97.02 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 1.00 400.00 255.00 75.00 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 13.00 151.00 487.50 125.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 1,200.00 100.00 81.91 68.00 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 91.00 85.00 95.71 77.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,641.00 98.00 85.63 73.87 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,193.00 94.46 89.27 74.31 =============== 206-00520 Filter Matl (CL B) Cubic Yard ============================================= ER144A-002 SH 144 East and West of Goodr 03/08/18 4,081.00 78.00 53.44 52.37 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,081.00 78.00 53.44 52.37 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 44.00 100.00 101.40 123.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 44.00 100.00 101.40 123.50 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 18.00 130.00 491.50 133.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 18.00 130.00 491.50 133.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,143.00 78.46 54.33 53.48 =============== 206-01000 Bed Course Matl Cubic Yard ============================================= NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 10.00 150.00 180.04 265.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 150.00 180.04 265.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 150.00 180.04 265.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 96 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-01500 Cofferdam LUMP SUM =============================================== FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 1.00 150000.00 88697.51 70000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 150000.00 88697.51 70000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 150000.00 88697.51 70000.00 =============== 206-01750 Shoring LUMP SUM =============================================== NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 1.00 7500.00 57879.06 17900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 7500.00 57879.06 17900.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 1.00 20000.00 28728.46 11000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 20000.00 28728.46 11000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 13750.00 39328.68 14450.00 =============== 206-01781 Shoring (A 1) LUMP SUM =============================================== NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 1.00 25000.00 23500.00 24000.00 ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 1.00 50000.00 38243.96 17500.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 1.00 28000.00 61254.75 65000.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 34333.33 43930.80 35500.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 1.00 60000.00 23100.00 17000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 60000.00 23100.00 17000.00 FBR060A-022 SH 60 over the South Platte 07/12/18 1.00 20000.00 35341.39 9500.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 1.00 25000.00 47685.00 24000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 22500.00 39889.03 16750.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 97 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-01781 Shoring (A 1) LUMP SUM =============================================== BR1131-006 SH 113 AT MP 11.5 10/11/18 1.00 12000.00 43480.78 12000.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 1.00 10000.00 21777.06 16909.75 ER052A-039 SH 170 11/15/18 1.00 17500.00 53916.00 25080.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 17850.00 22973.75 22973.75 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 18060.00 18060.00 18060.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 15082.00 36785.52 19004.70 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 25764.55 38227.13 22911.23 =============== 206-01782 Shoring (A 2) LUMP SUM =============================================== NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 1.00 25000.00 16875.00 7500.00 ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 1.00 20000.00 45791.58 17500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 22500.00 37529.70 12500.00 FBR060A-022 SH 60 over the South Platte 07/12/18 1.00 20000.00 24601.93 12500.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 1.00 25000.00 18335.00 24000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 22500.00 22293.06 18250.00 BR1131-006 SH 113 AT MP 11.5 10/11/18 1.00 12000.00 21030.19 12000.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 17850.00 26255.68 26255.68 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 18060.00 18060.00 18060.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 15970.00 21218.14 18771.89 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 19701.43 26746.70 16830.81 =============== 206-01783 Shoring (A 3) LUMP SUM =============================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 17850.00 3938.32 3938.32 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 18060.00 18060.00 18060.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 17955.00 10999.16 10999.16 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 17955.00 10999.16 10999.16 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 98 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-01784 Shoring (A 4) LUMP SUM =============================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 17850.00 16854.92 16854.92 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 28245.00 28245.00 28245.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 23047.50 22549.96 22549.96 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 23047.50 22549.96 22549.96 =============== 206-01785 Shoring (A 5) LUMP SUM =============================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 17850.00 16854.92 16854.92 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 14070.00 14070.00 14070.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 15960.00 15462.46 15462.46 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 15960.00 15462.46 15462.46 =============== 206-01786 Shoring (A 6) LUMP SUM =============================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 17850.00 3938.32 3938.32 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 29295.00 29295.00 29295.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 23572.50 16616.66 16616.66 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 23572.50 16616.66 16616.66 =============== 206-01787 Shoring (A 7) LUMP SUM =============================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 26302.50 26302.50 26302.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 26302.50 26302.50 26302.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 26302.50 26302.50 26302.50 =============== 206-01788 Shoring (A 8) LUMP SUM =============================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 26775.00 26775.00 26775.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 26775.00 26775.00 26775.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 26775.00 26775.00 26775.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 99 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-01789 Shoring (A 9) LUMP SUM =============================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 62790.00 62790.00 62790.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 62790.00 62790.00 62790.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 62790.00 62790.00 62790.00 =============== 206-01790 Shoring (A 10) LUMP SUM =============================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 37642.50 37642.50 37642.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 37642.50 37642.50 37642.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 37642.50 37642.50 37642.50 =============== 206-01791 Shoring (A 11) LUMP SUM =============================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 9660.00 9660.00 9660.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 9660.00 9660.00 9660.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 9660.00 9660.00 9660.00 =============== 206-01792 Shoring (A 12) LUMP SUM =============================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 34545.00 34545.00 34545.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 34545.00 34545.00 34545.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 34545.00 34545.00 34545.00 =============== 206-01793 Shoring (A 13) LUMP SUM =============================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 12705.00 12705.00 12705.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 12705.00 12705.00 12705.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 12705.00 12705.00 12705.00 =============== 206-01794 Shoring (A 14) LUMP SUM =============================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 40740.00 40740.00 40740.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 40740.00 40740.00 40740.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 40740.00 40740.00 40740.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 100 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-01795 Shoring (A 15) LUMP SUM =============================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 12705.00 12705.00 12705.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 12705.00 12705.00 12705.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 12705.00 12705.00 12705.00 =============== 206-01796 Shoring (A 16) LUMP SUM =============================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 36330.00 36330.00 36330.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 36330.00 36330.00 36330.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 36330.00 36330.00 36330.00 =============== 206-01797 Shoring (A 17) LUMP SUM =============================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 35595.00 35595.00 35595.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 35595.00 35595.00 35595.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 35595.00 35595.00 35595.00 =============== 206-01798 Shoring (A 18) LUMP SUM =============================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 39585.00 39585.00 39585.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 39585.00 39585.00 39585.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 39585.00 39585.00 39585.00 =============== 206-01799 Shoring (A 19) LUMP SUM =============================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 38430.00 38430.00 38430.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 38430.00 38430.00 38430.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 38430.00 38430.00 38430.00 =============== 206-01800 Shoring (A 20) LUMP SUM =============================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 63801.42 63801.42 63801.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 63801.42 63801.42 63801.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 63801.42 63801.42 63801.42 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 101 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-01801 Shoring (A 21) LUMP SUM =============================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 60158.60 60158.60 60158.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 60158.60 60158.60 60158.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 60158.60 60158.60 60158.60 =============== 206-01802 Shoring (A 22) LUMP SUM =============================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 85242.89 85242.89 85242.89 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 85242.89 85242.89 85242.89 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 85242.89 85242.89 85242.89 =============== 206-01803 Shoring (A 23 ) LUMP SUM =============================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 85242.89 85242.89 85242.89 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 85242.89 85242.89 85242.89 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 85242.89 85242.89 85242.89 =============== 206-01804 Shoring (A 24) LUMP SUM =============================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 123760.44 123760.44 123760.44 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 123760.44 123760.44 123760.44 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 123760.44 123760.44 123760.44 =============== 206-01805 Shoring (A 25) LUMP SUM =============================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 34602.92 34602.92 34602.92 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 34602.92 34602.92 34602.92 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 34602.92 34602.92 34602.92 =============== 206-01809 Shoring (A 29) LUMP SUM =============================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 30660.00 30660.00 30660.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 30660.00 30660.00 30660.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 30660.00 30660.00 30660.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 102 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-01810 Shoring (A 30) LUMP SUM =============================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 141645.00 141645.00 141645.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 141645.00 141645.00 141645.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 141645.00 141645.00 141645.00 =============== 206-01811 Shoring (A 31) LUMP SUM =============================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 47349.23 47349.23 47349.23 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 47349.23 47349.23 47349.23 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 47349.23 47349.23 47349.23 =============== 206-01812 Shoring (A 32) LUMP SUM =============================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 348074.24 348074.24 348074.24 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 348074.24 348074.24 348074.24 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 348074.24 348074.24 348074.24 =============== 207-00205 Topsoil Cubic Yard ============================================= FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 16.00 350.00 142.27 84.54 STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 5.00 100.00 282.50 200.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 145.00 50.00 48.67 30.00 ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 2,296.00 24.00 14.55 10.00 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 7.50 80.00 151.66 200.00 ER1151-033 PR SH 115-MP 34.7 01/25/18 823.00 12.00 14.26 2.50 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 540.00 13.00 52.54 39.38 ER144A-002 SH 144 East and West of Goodr 03/08/18 14,334.00 10.00 6.07 1.91 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 150.00 50.00 37.08 40.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 131.00 20.00 43.50 37.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 18,447.50 12.98 8.79 5.03 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 2,087.00 15.00 35.00 25.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 103 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 207-00205 Topsoil Cubic Yard ============================================= SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 10,200.00 13.00 9.15 7.30 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 457.00 45.00 43.76 47.30 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 1,020.00 13.00 25.00 17.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 23.00 150.00 210.00 210.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 50.00 40.00 48.25 52.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 13,837.00 14.68 19.96 12.50 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 325.00 18.00 22.43 10.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 700.00 25.00 25.96 24.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 1,736.00 40.00 37.60 54.80 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 3,603.00 11.00 6.30 9.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 670.00 20.00 11.22 1.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 463.00 18.00 20.12 10.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 885.00 20.00 20.34 9.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 9.00 75.00 55.00 11.00 STMR200-246 R2–2018 CRITICAL CULVERTS REP 09/20/18 35.00 75.00 120.00 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8,426.00 20.79 13.91 19.60 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 5,896.00 11.00 7.05 7.49 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 84.00 35.00 41.70 60.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 270.00 15.00 23.36 16.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 430.00 30.00 23.50 30.00 ER052A-039 SH 170 11/15/18 11.00 75.00 46.88 42.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1,693.00 106.04 106.06 106.06 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 280.00 30.00 96.00 67.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 499.00 25.00 50.09 8.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 26.00 60.00 69.41 20.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 10,000.00 11.00 24.13 9.50 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 100.00 65.00 56.66 75.09 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 1,613.00 10.00 33.43 20.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 57,602.00 6.72 6.72 6.72 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 78,504.00 10.28 17.54 10.08 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 119,214.50 11.95 13.48 10.25 =============== 207-00210 Stockpile Topsoil Cubic Yard ============================================= NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 25.70 11.00 71.50 36.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 104 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 207-00210 Stockpile Topsoil Cubic Yard ============================================= ER1151-033 PR SH 115-MP 34.7 01/25/18 31.50 6.00 124.44 400.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 ER144A-002 SH 144 East and West of Goodr 03/08/18 14,334.00 5.00 3.20 1.53 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 131.00 10.00 21.75 11.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 14,522.20 5.06 3.39 2.55 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 500.00 8.25 20.19 6.43 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 183.00 10.00 6.33 2.00 STAR400-347 Various intersections across 04/12/18 108.00 35.00 66.67 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 791.00 12.31 21.46 5.21 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 325.00 20.00 14.43 10.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 17,167.00 10.45 10.45 10.45 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 3,603.00 6.00 5.67 9.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 1,000.00 10.00 1.92 0.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 22,095.00 9.84 7.13 9.76 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 270.00 8.00 13.63 12.50 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 158.00 15.00 23.72 40.44 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 430.00 15.00 19.83 25.00 ER052A-039 SH 170 11/15/18 11.00 15.00 38.43 11.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1,680.00 10.74 20.20 20.20 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 57,602.00 5.46 5.46 5.46 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 60,151.00 5.71 6.78 6.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 97,559.20 6.61 5.39 6.41 =============== 207-00305 Wetland Topsoil Cubic Yard ============================================= NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 53.50 27.00 96.25 65.00 ER144A-002 SH 144 East and West of Goodr 03/08/18 161.00 15.00 20.55 12.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 214.50 17.99 29.43 25.56 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 105 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 207-00305 Wetland Topsoil Cubic Yard ============================================= FBR060A-022 SH 60 over the South Platte 07/12/18 226.00 10.00 17.53 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 226.00 10.00 17.53 22.00 BR1131-006 SH 113 AT MP 11.5 10/11/18 115.00 45.00 23.31 15.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 36.00 15.00 77.52 18.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 578.00 30.00 29.91 10.50 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 656.00 18.90 18.90 18.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,385.00 25.60 29.26 15.05 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,825.50 22.77 25.72 17.14 =============== 207-00310 Stockpile Wetland Topsoil Cubic Yard ============================================= ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 380.00 10.00 24.22 11.00 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 33.50 38.00 63.67 35.00 ER144A-002 SH 144 East and West of Goodr 03/08/18 161.00 10.00 18.35 20.85 NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 22.00 35.00 165.00 150.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 15.00 50.00 214.54 179.07 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 611.50 13.41 26.58 24.03 FBR060A-022 SH 60 over the South Platte 07/12/18 226.00 3.00 11.94 6.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 10.00 65.00 76.04 28.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 370.00 90.00 24.16 19.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 606.00 57.14 19.85 14.30 BR1131-006 SH 113 AT MP 11.5 10/11/18 115.00 20.00 20.67 15.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 656.00 17.33 17.33 17.33 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 771.00 17.73 19.45 16.98 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,988.50 28.41 22.48 18.33 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 106 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 207-00405 Topsoil (Spec) Cubic Yard ============================================= CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 860.00 51.80 32.00 32.00 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 3,315.00 43.61 53.00 53.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,175.00 45.30 48.67 48.67 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 440.00 52.50 52.50 52.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 440.00 52.50 52.50 52.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,615.00 45.98 49.04 49.04 =============== 207-00700 Topsoil (Onsite)-(Pilot Program ONLY) Cubic Yard ============================================= ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 13,981.00 17.50 15.43 15.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 13,981.00 17.50 15.43 15.00 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 4,564.00 10.00 10.38 5.19 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 4,500.00 10.00 6.97 6.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 9,064.00 10.00 9.25 5.89 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 23,045.00 14.55 13.09 11.42 =============== 207-00703 Topsoil (Wetlnd) - (Pilot Prog ONLY) Cubic Yard ============================================= ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 520.00 20.00 28.68 15.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 520.00 20.00 28.68 15.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 520.00 20.00 28.68 15.00 =============== 207-00704 Sub Soil Prep - (Pilot Prog ONLY) Sq Yard ================================================ ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 134,809.00 0.85 0.80 1.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 107 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 207-00704 Sub Soil Prep - (Pilot Prog ONLY) Sq Yard ================================================ STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 134,809.00 0.85 0.80 1.00 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 25,071.00 5.00 0.65 0.30 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 13,500.00 5.00 1.75 0.18 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 38,571.00 5.00 0.88 0.26 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 173,380.00 1.77 0.82 0.83 =============== 208-00002 Erosion Log Type 1 (12 In) Lin Foot =============================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 300.00 6.00 7.39 5.78 STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 2,500.00 5.00 5.96 8.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 300.00 6.00 4.60 4.50 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 100.00 6.00 6.57 9.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 210.00 6.00 12.75 20.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 2,310.00 7.00 4.63 4.00 CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 2,040.00 5.89 12.00 12.00 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 320.00 6.00 5.26 6.75 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 1,087.00 8.00 5.87 6.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 665.00 5.20 4.31 3.51 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 710.00 8.00 5.74 3.81 C0703-440 AVALANCHE CONTROL SYSTEM: EJM 02/01/18 100.00 15.00 22.23 16.00 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 275.00 5.00 4.51 5.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 140.00 15.00 9.21 7.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 23,545.00 4.50 4.37 4.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 10,467.00 3.60 3.46 3.80 MTCER500-201 R5 FY18 SIGN REPLACEMENT 03/08/18 20.00 5.00 16.71 3.00 NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 40.00 8.00 12.50 6.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 600.00 5.00 8.21 9.41 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 1,000.00 17.25 13.00 13.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 960.00 6.00 10.50 9.00 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 655.00 7.00 7.32 7.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 48,344.00 5.08 4.39 5.10 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 250.00 5.00 9.62 5.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 108 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00002 Erosion Log Type 1 (12 In) Lin Foot =============================================== FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 546.00 5.00 4.94 3.19 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 740.00 6.00 4.17 4.00 STAR400-347 Various intersections across 04/12/18 583.00 7.00 15.00 8.00 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 5,000.00 5.00 4.54 3.75 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 5,172.00 4.00 3.13 3.25 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 100.00 6.00 6.26 2.20 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 100.00 5.00 6.17 10.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 430.00 5.00 7.87 10.96 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 130.00 6.00 6.00 6.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 100.00 8.00 8.58 6.25 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 1,000.00 5.00 18.33 15.00 NHPP0761-230 I-76 AND COUNTY ROAD 22 AT FO 06/14/18 100.00 9.00 6.45 6.00 NHPP0703-436 EJMT PLENUM WATERPROOFING MEM 06/28/18 300.00 5.00 12.50 10.00 ER055A-001 PR SH 55 FLOOD REPAIR 2015 06/28/18 490.00 5.00 5.15 6.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 15,041.00 4.84 5.75 5.01 FBR060A-022 SH 60 over the South Platte 07/12/18 8,895.00 6.00 4.60 5.00 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 100.00 8.00 7.19 5.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 500.00 5.00 7.77 7.50 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 2,500.00 6.50 5.79 5.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 230.00 6.00 4.92 4.50 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 30,000.00 3.63 3.63 3.63 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 1,500.00 6.60 6.47 6.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 5,890.00 4.00 4.59 4.20 STA052A-040 SH 52: Antelope Creek 08/23/18 755.00 7.00 4.58 4.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 604.00 6.00 6.10 6.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 6,800.00 5.00 5.27 4.00 STMR200-246 R2–2018 CRITICAL CULVERTS REP 09/20/18 100.00 8.00 7.00 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 57,874.00 4.50 4.82 4.14 BR1131-006 SH 113 AT MP 11.5 10/11/18 1,000.00 6.00 4.74 5.00 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 50.00 7.00 13.88 6.00 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 250.00 6.00 5.64 4.16 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 1,030.00 5.50 6.37 4.86 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 1,630.00 6.00 5.60 4.40 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 1,200.00 5.00 6.71 5.50 NHPP0702-366 I-70 Avon to Vail 11/08/18 3,180.00 5.00 6.48 4.79 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 6,880.00 5.00 3.89 3.68 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 600.00 6.00 6.08 4.16 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 15,450.00 5.00 4.39 4.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 109 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00002 Erosion Log Type 1 (12 In) Lin Foot =============================================== NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 1,220.00 7.00 4.72 4.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 4,165.00 5.00 4.74 4.48 ER052A-039 SH 170 11/15/18 380.00 5.00 5.37 5.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 4,700.00 3.85 3.92 3.92 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 181.00 5.00 9.70 20.00 C R500-198 R5 GUARDRAIL REPLACEMENT/UPGR 11/29/18 400.00 6.00 5.50 5.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 1,686.00 6.00 4.95 5.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 900.00 6.00 5.74 4.15 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 100.00 5.00 9.77 10.05 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 100.00 25.00 10.91 12.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 1,820.00 6.00 5.63 6.00 STA052A-045 SH 52B NEW RAYMER SOUTH 12/13/18 675.00 6.00 5.67 5.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 44,880.00 4.82 4.82 4.82 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 92,477.00 5.01 4.91 4.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 213,736.00 4.87 4.75 4.65 =============== 208-00004 Silt Berm Lin Foot =============================================== STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 450.00 15.00 12.36 18.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 450.00 15.00 12.36 18.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 450.00 15.00 12.36 18.25 =============== 208-00008 Erosion Log Type 2 (12 In) Lin Foot =============================================== ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 2,500.00 7.00 5.74 5.00 ER1151-033 PR SH 115-MP 34.7 01/25/18 250.00 4.00 4.64 4.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 200.00 10.00 7.54 7.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,950.00 6.95 5.75 5.08 STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 270.00 8.00 11.13 15.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 3,650.00 7.00 5.14 5.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,920.00 7.07 5.42 6.15 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 420.00 5.75 7.95 8.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 420.00 5.75 7.95 8.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 110 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00008 Erosion Log Type 2 (12 In) Lin Foot =============================================== NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 500.00 10.00 9.08 7.00 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 512.00 7.00 9.00 8.00 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 600.00 5.00 6.71 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,612.00 7.19 7.59 6.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,902.00 6.99 5.94 5.92 =============== 208-00009 Erosion Log Type 2 (18 In) Lin Foot =============================================== NHPP5502-096 US550 STRIPING & RUMBLE STRIP 03/01/18 600.00 8.00 11.66 13.75 NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 130.00 8.00 22.00 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 730.00 8.00 13.10 13.08 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 730.00 8.00 13.10 13.08 =============== 208-00011 Erosion Bales (Weed Free) Each =================================================== NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 12.00 30.00 23.40 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12.00 30.00 23.40 16.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 30.00 23.40 16.00 =============== 208-00012 Erosion Log Type 1 (9 In) Lin Foot =============================================== NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 537.00 15.00 7.60 6.20 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 240.00 6.50 5.12 5.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 650.00 4.00 6.88 5.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,427.00 8.56 6.68 5.68 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 5,040.00 15.00 6.33 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5,040.00 15.00 6.33 7.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,467.00 13.58 6.41 6.71 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 111 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00013 Erosion Log Type 1 (20 In) Lin Foot =============================================== C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 38,000.00 6.54 6.54 6.54 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 38,000.00 6.54 6.54 6.54 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 28,380.00 6.70 6.70 6.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 28,380.00 6.70 6.70 6.70 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 66,380.00 6.61 6.61 6.61 =============== 208-00020 Silt Fence Lin Foot =============================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 200.00 2.00 4.09 3.68 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 260.00 2.50 2.63 3.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 300.00 5.00 2.97 1.31 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 700.00 1.50 2.16 3.00 NHPP5502-096 US550 STRIPING & RUMBLE STRIP 03/01/18 200.00 2.00 2.49 2.50 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 500.00 6.00 4.46 4.91 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,160.00 3.24 2.83 3.22 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 6,051.00 2.25 1.68 1.48 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 4,700.00 3.00 1.70 1.10 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 1,000.00 3.00 2.35 2.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 11,751.00 2.61 1.75 1.39 FBR060A-022 SH 60 over the South Platte 07/12/18 635.00 2.00 2.30 3.00 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 1,000.00 3.00 3.87 3.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 2,450.00 2.50 3.02 3.13 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 250.00 4.00 10.04 5.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 2,500.00 3.00 2.49 1.50 STMR200-246 R2–2018 CRITICAL CULVERTS REP 09/20/18 400.00 10.00 3.50 3.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7,235.00 3.16 2.97 2.62 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 112 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00020 Silt Fence Lin Foot =============================================== NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 36,965.00 2.00 1.55 1.46 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 1,230.00 2.00 2.41 1.82 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 500.00 5.00 4.83 7.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 160.00 2.00 2.63 3.54 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 500.00 5.00 5.47 5.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 2,000.00 8.00 1.77 2.00 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 200.00 4.00 2.33 3.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 40,280.00 1.07 1.07 1.07 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 81,835.00 1.73 1.56 1.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 102,981.00 1.96 1.87 1.48 =============== 208-00021 Silt Fence (Reinf) Lin Foot =============================================== ER1151-033 PR SH 115-MP 34.7 01/25/18 123.00 10.00 4.24 4.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 123.00 10.00 4.24 4.00 FBR060A-022 SH 60 over the South Platte 07/12/18 565.00 2.50 4.21 5.25 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 32,000.00 3.15 3.15 3.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 32,565.00 3.14 3.33 3.19 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 900.00 2.04 2.08 2.08 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 10,000.00 3.16 3.16 3.16 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10,900.00 3.07 3.07 3.07 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 43,588.00 3.14 3.29 3.16 =============== 208-00023 Erosion Log (Type 3)(12 In) Lin Foot =============================================== ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 15,236.00 5.50 4.91 5.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 113 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00023 Erosion Log (Type 3)(12 In) Lin Foot =============================================== STA0342-060 US 34D OVERLAY AND BRIDGE WOR NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 100.00 7.00 8.54 12.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 2,499.00 5.00 5.23 4.50 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 600.00 12.00 6.33 8.50 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 1,910.00 7.74 7.00 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20,345.00 5.85 5.09 5.26 ER055A-001 PR SH 55 FLOOD REPAIR 2015 06/28/18 1,650.00 6.00 6.32 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,650.00 6.00 6.32 8.00 FBR060A-022 SH 60 over the South Platte 07/12/18 900.00 6.00 5.60 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 900.00 6.00 5.60 6.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 2,500.00 6.00 4.58 4.20 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 5,000.00 25.00 6.04 5.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 7,500.00 18.67 5.64 5.07 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30,395.00 9.02 5.36 5.39 =============== 208-00026 Coir Roll Lin Foot =============================================== NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 680.00 15.00 13.29 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 680.00 15.00 13.29 13.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 680.00 15.00 13.29 13.00 =============== 208-00033 Sediment Trap Each =================================================== NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 1.00 1200.00 2583.75 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1200.00 2583.75 2000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 114 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00033 Sediment Trap Each =================================================== C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 3.00 1050.00 1050.00 1050.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 1050.00 1050.00 1050.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 22.00 4095.00 4095.00 4095.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 22.00 4095.00 4095.00 4095.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26.00 3632.31 3571.55 3663.08 =============== 208-00035 Aggregate Bag Lin Foot =============================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 80.00 7.00 11.96 8.92 STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 400.00 8.00 15.80 16.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 80.00 12.00 6.33 6.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 500.00 10.00 6.74 3.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 232.00 12.00 10.25 8.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 80.00 10.00 9.51 8.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR MTCER100-296 MTCE R1 FY18 WEST SIGN REPLAC 01/11/18 160.00 8.00 8.75 1.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 168.00 10.00 13.69 6.25 ITSSW01-833 ABOUT 1.5 MILES NORTH OF THE 01/18/18 368.00 10.00 14.00 11.00 STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 100.00 8.00 20.00 20.00 NHPP5502-088 US 550 RIVERSIDE SNOW SHED LI 01/25/18 30.00 10.00 33.49 10.20 ER1151-033 PR SH 115-MP 34.7 01/25/18 50.00 8.00 6.89 6.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 64.00 20.00 8.30 8.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 1,340.00 8.30 5.70 4.16 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 248.00 10.00 8.65 11.52 C0703-440 AVALANCHE CONTROL SYSTEM: EJM 02/01/18 100.00 16.00 22.42 14.00 STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 56.00 16.00 11.33 20.00 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 540.00 8.00 5.61 5.00 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 80.00 12.00 14.75 17.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 250.00 10.00 8.88 7.00 MTCER500-201 R5 FY18 SIGN REPLACEMENT 03/08/18 20.00 8.00 10.71 1.00 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 48.00 14.48 12.00 12.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 150.00 12.00 16.00 12.00 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 28.00 12.00 15.74 11.21 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,172.00 9.59 8.52 7.63 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 115 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00035 Aggregate Bag Lin Foot =============================================== NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPL 04/05/18 100.00 8.00 18.33 11.00 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 100.00 8.00 19.20 10.50 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 200.00 9.00 7.46 5.32 STAR400-347 Various intersections across 04/12/18 171.00 10.00 17.00 6.00 STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 67.00 13.00 16.69 19.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 33.00 9.00 10.17 9.50 FSA0711-020 SH 71 & SH 94: PUNKIN CENTER 05/03/18 150.00 8.00 16.33 30.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 160.00 7.00 11.11 16.44 MTCE R100-312 R1 CHIP SEAL 05/17/18 200.00 11.00 25.00 25.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 158.00 10.00 10.00 10.00 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 500.00 8.00 26.00 28.00 NHPP0761-230 I-76 AND COUNTY ROAD 22 AT FO 06/14/18 200.00 9.00 9.15 8.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,039.00 8.92 14.67 17.28 NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 200.00 12.00 15.00 15.00 FBR060A-022 SH 60 over the South Platte 07/12/18 150.00 6.00 8.09 6.50 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 440.00 10.00 9.86 8.00 SHE0701-245 I-70 MEDIAN CABLE RAIL INSTAL 07/12/18 100.00 7.00 25.00 25.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 6,600.00 4.82 4.82 4.82 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 1,500.00 13.20 12.31 15.00 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 630.00 11.00 10.50 5.00 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 364.00 8.00 10.35 12.00 STA052A-040 SH 52: Antelope Creek 08/23/18 200.00 10.00 8.83 6.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 730.00 8.00 6.82 10.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 10.00 8.52 9.50 7.00 NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 200.00 10.00 16.00 16.00 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 450.00 7.50 13.41 9.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 11,574.00 7.18 9.05 7.59 NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 360.00 10.00 12.50 10.00 BR1131-006 SH 113 AT MP 11.5 10/11/18 100.00 10.00 9.57 6.25 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 100.00 10.00 13.75 13.00 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 250.00 10.00 9.88 10.00 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 100.00 12.00 6.71 7.80 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 40.00 8.00 9.88 10.98 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 1,400.00 8.00 7.27 6.25 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 116 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00035 Aggregate Bag Lin Foot =============================================== NHPP0702-366 I-70 Avon to Vail 11/08/18 240.00 10.00 13.49 16.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 3,000.00 9.00 5.62 5.51 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 350.00 10.00 11.58 8.75 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 150.00 10.00 7.10 7.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 300.00 10.00 10.97 9.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 1,500.00 7.00 8.15 8.26 ER052A-039 SH 170 11/15/18 100.00 8.00 8.44 4.00 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 490.00 12.00 5.00 5.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1,000.00 4.89 4.98 4.98 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 280.00 10.00 11.46 10.75 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 570.00 10.00 13.00 20.00 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 190.00 12.00 8.25 6.50 C R500-198 R5 GUARDRAIL REPLACEMENT/UPGR 11/29/18 60.00 12.00 9.38 8.75 STA086A-051 SH 86; WEST OF I-70 11/29/18 750.00 8.00 7.52 5.90 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 625.00 8.00 5.96 4.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 100.00 12.00 11.01 15.08 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 80.00 25.00 16.56 17.50 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 500.00 12.00 6.62 7.00 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 200.00 12.00 7.64 7.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 224.00 7.00 10.26 21.23 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 240.00 12.00 11.33 17.00 STAR100-279 FY20 HMA PREVENTATIVE MAINTEN 12/13/18 1,000.00 12.00 8.00 4.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 47,520.00 3.75 3.75 3.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 61,819.00 5.00 6.17 4.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 80,604.00 5.71 7.38 5.58 =============== 208-00036 Aggregate Bag (Special) Lin Foot =============================================== ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 2,577.00 18.13 15.00 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,577.00 18.13 15.00 15.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 3,000.00 9.50 9.38 3.47 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,000.00 9.50 9.38 3.47 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,577.00 13.49 10.37 8.80 =============== 208-00041 Rock Check Dam Each =================================================== STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 12.00 800.00 564.38 350.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 117 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00041 Rock Check Dam Each =================================================== NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 3.00 500.00 823.75 220.00 ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 4.00 500.00 824.43 720.00 ER1151-033 PR SH 115-MP 34.7 01/25/18 1.00 370.00 2154.81 5000.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 164.00 550.00 563.71 650.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 36.00 928.24 728.00 728.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 220.00 623.12 581.52 661.58 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 6.00 750.00 815.20 450.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 2.00 800.00 935.00 937.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 762.50 835.17 571.88 FBR060A-022 SH 60 over the South Platte 07/12/18 4.00 100.00 894.32 700.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 18.00 735.00 735.00 735.00 STMR200-246 R2–2018 CRITICAL CULVERTS REP 09/20/18 4.00 800.00 600.00 600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 26.00 647.31 836.54 708.85 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 60.00 910.72 910.72 910.72 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 60.00 910.72 910.72 910.72 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 314.00 683.63 610.41 710.82 =============== 208-00045 Conc Washout Str Each =================================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 1.00 1000.00 5425.00 5000.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 2.00 1500.00 718.78 375.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 4.00 1600.00 1153.80 1850.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 2.00 1500.00 1673.19 910.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 2.00 1500.00 1930.66 1200.00 CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 2.00 12437.09 30000.00 30000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 118 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00045 Conc Washout Str Each =================================================== STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 4.00 1100.00 693.16 920.00 ER1151-033 PR SH 115-MP 34.7 01/25/18 2.00 1200.00 1253.14 2100.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 2.00 2400.00 2295.48 1760.68 STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 1.00 800.00 1290.00 825.00 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 3.00 1000.00 1661.55 900.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 5.00 1000.00 1767.50 1000.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 3.00 1500.00 886.05 600.00 NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 1.00 2000.00 1080.18 629.44 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 2.00 1500.00 1538.16 1800.00 NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 1.00 1500.00 2450.00 1800.00 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 1.00 11399.50 11000.00 11000.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 2.00 1500.00 2625.00 2450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 40.00 2176.84 1763.72 3025.65 NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPL 04/05/18 1.00 750.00 850.00 365.00 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 1.00 1500.00 1537.60 900.00 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 3.00 1300.00 1493.37 1993.07 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 2.00 1300.00 1066.67 750.00 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 2.00 1250.00 955.00 1500.00 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 4.00 1000.00 1175.00 1500.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 1.00 1600.00 1439.38 2200.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 1.00 1380.00 1733.33 2100.00 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 4.00 1500.00 2166.67 1600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 19.00 1275.26 1458.00 1497.06 FBR060A-022 SH 60 over the South Platte 07/12/18 2.00 1500.00 1566.62 1500.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 1.00 1300.00 1881.43 1125.00 SHE0701-245 I-70 MEDIAN CABLE RAIL INSTAL 07/12/18 1.00 550.00 1500.00 1500.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 2.00 3150.00 3150.00 3150.00 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 14.00 4500.00 1033.22 1000.00 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 3.00 1500.00 620.00 726.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 2.00 1500.00 1794.83 2000.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 2.00 1300.00 2388.65 1300.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 1.00 3025.00 2324.25 2000.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 2.00 1500.00 1428.75 1100.00 STMR200-246 R2–2018 CRITICAL CULVERTS REP 09/20/18 3.00 1800.00 1000.00 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 33.00 2899.24 1449.68 1269.79 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 119 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00045 Conc Washout Str Each =================================================== BR1131-006 SH 113 AT MP 11.5 10/11/18 2.00 1500.00 1372.61 1125.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 1.00 3000.00 1450.16 1040.48 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 2.00 900.00 1050.17 700.34 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 2.00 1500.00 2070.00 3000.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 1.00 2000.00 968.99 1306.97 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 4.00 1250.00 725.22 712.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 2.00 1500.00 6768.99 21947.97 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 21.00 1000.00 1868.33 2180.00 MTCE0253-267 MTCE R4 FY19 I25 CONCRETE PAN 12/13/18 1.00 1500.00 4002.75 8500.00 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 2.00 1000.00 1678.57 600.00 MPR200-252 REGION 2 - PUEBLO COUNTY HIGH 12/20/18 2.00 900.00 2400.00 500.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 2.00 9091.53 9091.53 9091.53 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 42.00 1554.36 2059.90 3176.31 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 134.00 2031.80 1720.23 2423.72 =============== 208-00046 Pre-fab Conc Washout Str Each =================================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 1.00 1700.00 562.26 374.52 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 2.00 1500.00 1233.33 1800.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 1.00 1500.00 4775.00 10000.00 MTCER100-296 MTCE R1 FY18 WEST SIGN REPLAC 01/11/18 2.00 1750.00 1052.00 500.00 ITSSW01-833 ABOUT 1.5 MILES NORTH OF THE 01/18/18 1.00 2500.00 850.50 177.00 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 1.00 1000.00 2922.58 1750.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 1.00 1000.00 2091.07 1520.20 C0703-440 AVALANCHE CONTROL SYSTEM: EJM 02/01/18 2.00 5000.00 2314.20 1850.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 1.00 1000.00 2901.18 3000.00 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 2.00 2500.00 1150.00 1300.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 1.00 2500.00 1567.77 1735.54 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 4.00 1996.02 2700.00 2700.00 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 1.00 1600.00 1231.10 1751.31 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 2114.20 1947.59 2100.43 STAR400-347 Various intersections across 04/12/18 5.00 750.00 716.67 500.00 STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 1.00 1500.00 978.75 640.00 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 2.00 2000.00 1187.52 500.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 3.00 1000.00 2286.07 2279.26 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 120 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00046 Pre-fab Conc Washout Str Each =================================================== NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 3.00 2000.00 8000.00 8000.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 1.00 1500.00 1300.00 775.00 NHPP0761-230 I-76 AND COUNTY ROAD 22 AT FO 06/14/18 1.00 1500.00 1726.38 3000.00 NHPP0703-436 EJMT PLENUM WATERPROOFING MEM 06/28/18 2.00 1500.00 1885.00 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 18.00 1347.22 1770.84 2264.04 NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 1.00 1500.00 2500.00 2500.00 FBR060A-022 SH 60 over the South Platte 07/12/18 2.00 1600.00 2090.01 2250.00 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 5.00 2500.00 2284.17 460.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 1.00 1600.00 3833.33 3800.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 2.00 2000.00 1738.33 1715.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 10.00 3166.86 3166.86 3166.86 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 1.00 2000.00 2600.00 700.00 STA052A-040 SH 52: Antelope Creek 08/23/18 1.00 1750.00 1509.17 535.00 NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 1.00 1500.00 2588.00 2588.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 2.00 1500.00 1993.79 2000.00 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 2.00 1600.00 1200.25 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 28.00 2354.24 2212.00 2036.49 NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 1.00 1500.00 1633.00 1200.00 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 1.00 1500.00 1077.50 245.00 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 1.00 1500.00 1430.00 1360.00 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 1.00 2000.00 888.01 600.00 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 2.00 1600.00 1565.14 1400.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 2.00 1621.00 3035.71 2400.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 2.00 1800.00 701.23 700.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 31.00 1600.00 1002.00 500.00 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 2.00 4000.00 1535.00 500.00 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 4.00 1500.00 658.88 500.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 1.00 1600.00 2530.00 2500.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 1.00 1600.00 1329.85 1352.78 ER052A-039 SH 170 11/15/18 1.00 1500.00 2074.00 2120.00 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 2.00 600.00 1500.00 1500.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 10.00 1238.31 1062.19 1062.19 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 2.00 2500.00 5153.45 5863.81 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 1.00 1500.00 2000.00 1000.00 C R500-198 R5 GUARDRAIL REPLACEMENT/UPGR 11/29/18 1.00 2000.00 1.00 1.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 1.00 2100.00 2730.62 990.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 4.00 1500.00 1479.98 1950.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 2.00 1500.00 1850.56 1000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 121 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00046 Pre-fab Conc Washout Str Each =================================================== NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 3.00 1500.00 2129.29 1000.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 8.00 5218.54 5218.54 5218.54 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 84.00 1955.64 1624.45 1413.89 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 150.00 1978.17 1819.13 1723.66 =============== 208-00051 Storm Drain Inlet Protection (Type I) Lin Foot =============================================== STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 30.00 20.00 10.62 17.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 56.00 20.00 27.15 14.25 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 120.00 12.00 13.46 17.91 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 12.00 20.00 40.50 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 218.00 15.60 19.01 16.74 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 311.00 13.00 9.40 9.59 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 30.00 15.00 21.25 18.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 341.00 13.18 10.20 10.40 NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 6.00 200.00 250.00 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 200.00 250.00 250.00 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 100.00 15.00 79.88 13.00 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 20.00 20.00 15.80 20.00 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 520.00 10.00 12.18 11.33 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 4.00 20.00 158.40 250.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 75.00 20.00 12.31 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 719.00 12.07 22.81 12.99 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,284.00 13.84 19.10 14.05 =============== 208-00052 Storm Drain Inlet Protection (Type II) Lin Foot =============================================== FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 60.00 55.00 47.75 29.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 60.00 55.00 47.75 29.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 122 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00052 Storm Drain Inlet Protection (Type II) Lin Foot =============================================== NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 100.00 50.00 93.00 29.00 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 16.00 80.00 25.00 25.00 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 200.00 50.00 45.24 53.24 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 2.00 45.00 250.00 400.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 45.00 55.00 36.06 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 363.00 51.91 58.88 43.11 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 423.00 52.35 57.25 41.11 =============== 208-00053 Storm Drain Inlet Protect (Ty I)(84 In) Each =================================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 11.00 200.00 197.25 200.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 2.00 250.00 131.67 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 13.00 207.69 183.20 183.08 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 11.00 300.00 75.00 75.00 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 1.00 300.00 566.67 850.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12.00 300.00 180.36 139.58 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 3.00 1000.00 294.00 392.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 12.00 20.00 171.46 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 15.00 216.00 185.07 318.40 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 60.00 320.00 167.00 155.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 93.00 100.00 121.82 201.29 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 11.00 150.00 149.67 107.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 164.00 183.84 137.29 178.03 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 204.00 194.56 143.86 186.41 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 123 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00054 Storm Drain Inlet Protection (Type II) Each =================================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 5.00 300.00 300.00 340.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 2.00 250.00 186.67 135.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 5.00 50.00 317.33 300.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12.00 187.50 293.98 289.17 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 37.00 240.00 308.38 383.53 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 37.00 240.00 308.38 383.53 NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 2.00 250.00 200.00 200.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 6.00 40.00 289.72 240.00 NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 4.00 275.00 162.00 162.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.00 153.33 266.71 207.33 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 110.00 450.00 238.67 155.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 370.00 4.90 5.00 5.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 8.00 275.00 355.48 736.92 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 11.00 275.00 258.33 202.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 499.00 113.30 131.39 54.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 560.00 124.12 168.91 84.22 =============== 208-00056 Storm Drain Inlet Protection (Type III) Each =================================================== NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 2.00 400.00 745.00 490.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 400.00 745.00 490.00 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 2.00 300.00 933.33 940.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 300.00 933.33 940.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 124 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00056 Storm Drain Inlet Protection (Type III) Each =================================================== NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 9.00 300.00 350.00 350.00 FBR060A-022 SH 60 over the South Platte 07/12/18 4.00 500.00 337.94 225.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 6.00 350.00 368.53 350.00 NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 8.00 300.00 115.00 115.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 27.00 340.74 327.37 261.85 NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 9.00 300.00 410.50 370.00 SHE2254-092 SH225 AND 17TH PLACE IMPROVEM 10/18/18 4.00 490.00 496.67 450.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 1.00 300.00 168.67 143.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 640.00 4.90 5.00 5.00 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 11.00 185.00 660.00 1000.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 21.00 450.00 128.06 136.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 70.00 175.00 195.63 265.51 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 756.00 42.10 109.03 54.12 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 787.00 53.91 131.58 64.61 =============== 208-00060 Temporary Slope Drain Lin Foot =============================================== FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 70.00 20.00 39.12 22.22 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 70.00 20.00 39.12 22.22 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 140.00 20.00 32.44 18.04 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 140.00 20.00 32.44 18.04 FBR060A-022 SH 60 over the South Platte 07/12/18 400.00 12.00 25.61 3.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 460.00 42.00 42.00 42.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 860.00 28.05 27.04 23.86 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 125 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00060 Temporary Slope Drain Lin Foot =============================================== BR1131-006 SH 113 AT MP 11.5 10/11/18 40.00 15.00 71.61 50.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 180.00 15.00 52.11 28.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1,280.00 11.25 11.25 11.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,500.00 11.80 32.06 14.29 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,570.00 17.91 29.67 17.91 =============== 208-00070 Vehicle Tracking Pad Each =================================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 1.00 2000.00 1521.16 2042.31 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 2.00 2000.00 1966.67 2000.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 2.00 2000.00 2427.50 2000.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 4.00 2000.00 2566.97 2250.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 3.00 2100.00 3266.11 3100.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 2.00 2000.00 1758.75 800.00 CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 4.00 3687.08 4800.00 4800.00 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 6.00 1600.00 1419.43 500.00 ER1151-033 PR SH 115-MP 34.7 01/25/18 1.00 1000.00 1837.71 2200.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 3.00 1500.00 2930.46 1850.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 2.00 1450.00 2833.69 5288.13 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 2.00 1500.00 2604.63 2658.19 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 2.00 1500.00 3221.05 3000.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 5.00 1200.00 2881.25 1400.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 3.00 2000.00 3093.30 2000.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 2.00 2000.00 2887.78 2300.00 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 10.00 4013.63 4200.00 4200.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 2.00 2500.00 2300.00 2100.00 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 1.00 3000.00 2525.64 2083.91 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 57.00 2301.48 2703.07 2590.68 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 4.00 3000.00 3733.33 2200.00 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 5.00 2000.00 1600.00 1500.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 1.00 2300.00 2412.50 1925.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 126 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00070 Vehicle Tracking Pad Each =================================================== NH0242-071 US 24 & 31ST STREET and US24 05/03/18 2.00 2250.00 2441.67 3200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12.00 2400.00 2604.76 2052.08 FBR060A-022 SH 60 over the South Platte 07/12/18 8.00 1500.00 2760.81 1100.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 2.00 1200.00 3904.29 1875.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 8.00 1600.00 2371.67 2130.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 10.00 3255.00 3255.00 3255.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 2.00 2700.00 2452.92 2000.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 2.00 2000.00 2365.63 900.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 2.00 2600.00 2909.46 2000.00 STMR200-246 R2–2018 CRITICAL CULVERTS REP 09/20/18 3.00 2500.00 1375.00 1375.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 37.00 2212.16 2717.98 2055.81 BR1131-006 SH 113 AT MP 11.5 10/11/18 2.00 2000.00 2922.06 2000.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 4.00 2600.00 2209.18 1777.54 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 2.00 2000.00 2440.71 2500.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 1.00 2200.00 4018.71 5145.00 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 1.00 2000.00 1502.24 2004.48 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 2.00 3700.00 2815.00 2900.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 3.00 2800.00 3198.33 1750.00 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 2.00 2500.00 1900.00 2500.00 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 4.00 2650.00 2350.00 2700.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 1.00 2500.00 2881.54 2168.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 4.00 3000.00 3440.41 3100.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 2.00 2000.00 3681.60 4737.38 STA052A-045 SH 52B NEW RAYMER SOUTH 12/13/18 1.00 2500.00 1533.33 1500.00 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 4.00 3100.00 2228.57 1600.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 2.00 3255.00 3255.00 3255.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 35.00 2683.14 2719.99 2530.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 141.00 2381.17 2705.49 2389.51 =============== 208-00071 Maint Aggregate (Veh Track Pad) Cubic Yard ============================================= CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 100.00 74.42 80.00 80.00 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 463.00 87.33 80.00 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 563.00 85.04 80.00 80.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 127 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00071 Maint Aggregate (Veh Track Pad) Cubic Yard ============================================= NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 150.00 80.00 51.12 47.05 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 16.00 80.00 122.81 150.00 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 25.00 190.00 99.33 133.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 750.00 73.50 73.50 73.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 941.00 77.74 70.41 72.17 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,504.00 80.47 73.22 75.10 =============== 208-00075 Pre-fab Vehicle Track Pad Each =================================================== STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 2.00 1000.00 2262.50 700.00 ER1151-033 PR SH 115-MP 34.7 01/25/18 1.00 1500.00 1144.30 1225.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 2.00 2000.00 2035.43 1000.00 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 2.00 2500.00 1137.50 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7.00 1785.71 1716.45 946.43 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 4.00 2100.00 4015.28 5416.18 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 4.00 2000.00 3420.00 1500.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 3.00 1500.00 1420.00 10.00 ER055A-001 PR SH 55 FLOOD REPAIR 2015 06/28/18 2.00 1500.00 3220.56 4000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 13.00 1838.46 3435.64 2745.75 FBR060A-022 SH 60 over the South Platte 07/12/18 2.00 1500.00 3247.22 4000.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 10.00 17956.89 17956.89 17956.89 STA052A-040 SH 52: Antelope Creek 08/23/18 2.00 2000.00 2220.83 425.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 4.00 2400.00 3478.87 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 18.00 10898.27 4858.03 11578.83 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 1.00 1653.00 3835.71 760.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 128 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00075 Pre-fab Vehicle Track Pad Each =================================================== NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 20.00 1750.00 1682.00 1440.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 4.00 1700.00 3961.53 557.21 ER052A-039 SH 170 11/15/18 2.00 2000.00 2168.00 1590.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 8.00 4620.00 8561.66 8561.66 STA086A-051 SH 86; WEST OF I-70 11/29/18 2.00 2500.00 3693.29 2200.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 18.00 4209.38 4209.38 4209.38 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 55.00 3003.31 3161.91 3338.74 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 93.00 4276.89 3546.99 4670.64 =============== 208-00090 Erosion Control (Curb Ramp) Each =================================================== C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 59.00 350.00 468.75 600.00 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 170.00 300.00 448.75 525.00 STM0252-469 R2 ADA RAMPS I-25 INT S NEV- 09/06/18 153.00 700.00 237.50 75.00 NHPP070A-032 I-70B & Z GRAND JCT PHASE 1 A 09/20/18 131.00 500.00 244.00 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 513.00 476.12 372.22 341.96 C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 49.00 500.00 716.00 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 49.00 500.00 716.00 300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 562.00 478.20 420.94 338.30 =============== 208-00103 Removal and Disposal of Sediment (Labor) Hour =================================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 20.00 50.00 83.90 117.80 STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 40.00 50.00 69.00 60.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 20.00 55.00 47.00 75.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 40.00 50.00 52.91 34.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 15.00 60.00 52.50 35.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 72.00 63.00 44.80 75.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 250.00 40.00 60.63 37.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 40.00 60.00 74.25 30.00 CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 16.00 60.34 45.00 45.00 ITSSW01-833 ABOUT 1.5 MILES NORTH OF THE 01/18/18 10.00 80.00 52.00 29.00 STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 30.00 60.00 40.00 40.00 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 40.00 60.00 43.88 55.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 129 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00103 Removal and Disposal of Sediment (Labor) Hour =================================================== ER1151-033 PR SH 115-MP 34.7 01/25/18 60.00 52.00 46.23 46.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 85.00 60.00 91.82 65.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 117.00 54.00 77.87 47.77 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 40.00 60.00 59.12 111.61 C0703-440 AVALANCHE CONTROL SYSTEM: EJM 02/01/18 20.00 50.00 127.79 110.00 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 20.00 50.00 51.39 55.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 72.00 60.00 68.85 65.00 NHPP5502-096 US550 STRIPING & RUMBLE STRIP 03/01/18 10.00 50.00 61.00 58.00 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 16.00 100.00 62.75 45.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 200.00 50.00 47.00 36.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 50.00 75.00 47.77 51.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 25.00 50.00 56.04 84.00 NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 20.00 55.00 128.33 45.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 10.00 30.00 65.36 50.72 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 100.00 56.41 50.00 50.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 10.00 75.00 50.00 45.00 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 6.00 100.00 128.19 95.58 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,454.00 54.09 60.22 51.79 NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPL 04/05/18 5.00 50.00 113.67 36.00 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 20.00 60.00 93.20 65.00 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 40.00 50.00 50.54 48.34 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 40.00 85.00 39.00 35.00 STAR400-347 Various intersections across 04/12/18 46.00 50.00 45.33 10.00 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 40.00 54.00 56.75 29.00 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 60.00 50.00 28.00 29.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 40.00 60.00 52.12 35.20 STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 1.00 60.00 80.75 62.00 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 10.00 100.00 55.16 52.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 250.00 57.00 42.63 33.00 FSA0711-020 SH 71 & SH 94: PUNKIN CENTER 05/03/18 5.00 50.00 96.67 100.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 20.00 70.00 65.00 65.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 8.00 60.00 86.25 75.00 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 80.00 50.00 135.00 140.00 NHPP0761-230 I-76 AND COUNTY ROAD 22 AT FO 06/14/18 10.00 60.00 70.67 33.00 ER055A-001 PR SH 55 FLOOD REPAIR 2015 06/28/18 30.00 60.00 56.77 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 705.00 57.52 54.92 48.01 NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 30.00 65.00 55.00 55.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 130 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00103 Removal and Disposal of Sediment (Labor) Hour =================================================== FBR060A-022 SH 60 over the South Platte 07/12/18 80.00 40.00 58.38 60.00 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 10.00 65.00 80.50 61.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 44.00 40.00 56.74 37.50 SHE0701-245 I-70 MEDIAN CABLE RAIL INSTAL 07/12/18 20.00 46.00 60.00 60.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 45.00 60.00 50.30 55.90 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 300.00 48.62 48.62 48.62 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 100.00 66.00 59.74 40.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 200.00 52.00 44.05 36.00 STA052A-040 SH 52: Antelope Creek 08/23/18 30.00 50.00 57.83 30.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 150.00 55.00 41.56 50.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 100.00 52.00 43.32 35.00 NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 30.00 45.00 45.00 45.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 60.00 54.00 47.07 40.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 8.00 50.00 63.75 59.00 STMR200-246 R2–2018 CRITICAL CULVERTS REP 09/20/18 20.00 45.00 50.00 50.00 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 15.00 52.00 77.25 59.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,242.00 51.84 49.32 45.26 NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 30.00 60.00 46.00 45.00 BR1131-006 SH 113 AT MP 11.5 10/11/18 25.00 50.00 50.24 37.50 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 32.00 65.00 64.50 37.00 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 40.00 50.00 38.25 40.00 SHE2254-092 SH225 AND 17TH PLACE IMPROVEM 10/18/18 5.00 51.79 101.67 80.00 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 30.00 55.00 43.89 39.53 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 50.00 55.00 50.84 57.51 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 10.00 50.00 88.92 78.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 60.00 55.00 61.16 40.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 60.00 60.00 65.24 70.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 200.00 50.00 58.08 45.00 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 10.00 60.00 57.00 54.00 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 25.00 50.00 61.67 5.00 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 60.00 60.00 52.73 10.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 20.00 75.00 66.33 65.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 60.00 50.00 57.93 48.40 ER052A-039 SH 170 11/15/18 20.00 50.00 40.19 38.00 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 10.00 50.00 35.00 35.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 150.00 55.83 48.48 48.48 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 20.00 65.00 118.87 126.47 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 30.00 55.00 52.00 80.00 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 8.00 75.00 80.00 60.00 C R500-198 R5 GUARDRAIL REPLACEMENT/UPGR 11/29/18 10.00 60.00 86.50 80.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 20.00 50.00 47.99 50.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 80.00 60.00 94.13 175.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 48.00 60.00 87.38 30.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 131 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00103 Removal and Disposal of Sediment (Labor) Hour =================================================== STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 20.00 45.00 70.13 75.38 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 420.00 75.00 68.32 71.00 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 12.00 45.00 65.27 50.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 360.00 60.00 81.07 52.28 STA052A-045 SH 52B NEW RAYMER SOUTH 12/13/18 50.00 50.00 58.83 45.00 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 85.00 90.00 44.00 37.00 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 100.00 40.00 53.29 33.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 500.00 49.99 49.99 49.99 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,660.00 58.47 64.83 55.21 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,061.00 55.95 58.52 51.51 =============== 208-00105 Removal and Disposal of Sediment (Equip) Hour =================================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 20.00 150.00 113.65 127.29 STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 10.00 150.00 150.00 140.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 20.00 120.00 121.67 75.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 20.00 120.00 123.43 75.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 15.00 125.00 157.50 165.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 33.00 120.00 98.93 125.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 250.00 120.00 123.67 110.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 20.00 110.00 140.39 110.00 CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 16.00 147.78 110.00 110.00 ITSSW01-833 ABOUT 1.5 MILES NORTH OF THE 01/18/18 10.00 140.00 104.00 56.00 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 40.00 130.00 114.28 110.00 ER1151-033 PR SH 115-MP 34.7 01/25/18 60.00 100.00 126.36 115.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 34.00 125.00 138.87 100.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 39.00 98.00 121.10 112.21 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 20.00 125.00 116.02 105.01 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 20.00 130.00 112.38 130.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 34.00 125.00 126.97 100.00 NHPP5502-096 US550 STRIPING & RUMBLE STRIP 03/01/18 10.00 100.00 149.25 145.00 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 10.00 150.00 112.75 90.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 200.00 100.00 119.63 65.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 100.00 125.00 112.85 102.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 25.00 100.00 146.50 147.00 NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 20.00 125.00 135.00 90.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 10.00 120.00 162.25 124.50 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 100.00 138.15 110.00 110.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 10.00 125.00 120.00 80.00 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 4.00 165.00 257.07 147.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,150.00 118.82 121.87 102.09 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 132 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00105 Removal and Disposal of Sediment (Equip) Hour =================================================== NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPL 04/05/18 5.00 89.00 236.67 70.00 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 10.00 120.00 130.20 125.00 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 40.00 100.00 94.91 144.31 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 40.00 125.00 101.67 100.00 STAR400-347 Various intersections across 04/12/18 46.00 90.00 66.00 10.00 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 40.00 110.00 98.00 100.00 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 16.00 100.00 92.50 75.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 40.00 140.00 105.94 82.50 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 300.00 110.00 102.58 120.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 20.00 130.00 157.00 157.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 8.00 120.00 172.17 62.50 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 40.00 150.00 241.67 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 605.00 113.96 107.04 112.35 FBR060A-022 SH 60 over the South Platte 07/12/18 80.00 90.00 114.32 150.00 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 10.00 160.00 166.83 155.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 20.00 100.00 125.29 87.50 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 20.00 150.00 107.05 134.15 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 300.00 96.16 96.16 96.16 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 50.00 120.00 95.82 110.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 200.00 115.00 103.34 115.00 STA052A-040 SH 52: Antelope Creek 08/23/18 8.00 125.00 120.00 65.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 100.00 110.00 89.69 120.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 100.00 120.00 115.61 110.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 60.00 110.00 117.05 150.00 STMR200-246 R2–2018 CRITICAL CULVERTS REP 09/20/18 20.00 85.00 100.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 968.00 107.38 108.19 113.48 NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 50.00 115.00 91.50 75.00 BR1131-006 SH 113 AT MP 11.5 10/11/18 50.00 100.00 110.04 87.50 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 32.00 120.00 98.00 72.00 SHE2254-092 SH225 AND 17TH PLACE IMPROVEM 10/18/18 5.00 102.09 181.67 130.00 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 30.00 110.00 110.08 83.30 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 50.00 110.00 151.14 78.42 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 10.00 105.00 162.39 265.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 32.00 111.00 168.14 75.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 133 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00105 Removal and Disposal of Sediment (Equip) Hour =================================================== NHPP0702-366 I-70 Avon to Vail 11/08/18 30.00 115.00 141.83 145.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 20.00 100.00 93.93 90.00 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 10.00 130.00 135.90 136.80 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 10.00 140.00 136.67 5.00 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 60.00 125.00 80.01 10.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 10.00 140.00 184.00 80.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 32.00 100.00 131.19 66.55 ER052A-039 SH 170 11/15/18 4.00 100.00 98.34 57.00 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 10.00 125.00 55.00 55.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 40.00 91.25 130.97 130.97 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 20.00 100.00 216.05 224.20 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 30.00 135.00 89.00 125.00 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 8.00 150.00 177.50 210.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 20.00 100.00 128.91 145.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 10.00 100.00 137.12 211.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 20.00 100.00 118.92 100.50 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 420.00 135.00 112.96 90.00 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 12.00 100.00 145.31 100.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 90.00 113.00 101.68 119.71 STA052A-045 SH 52B NEW RAYMER SOUTH 12/13/18 50.00 100.00 113.33 85.00 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 85.00 150.00 62.33 77.00 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 100.00 110.00 94.29 70.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 500.00 97.53 97.53 97.53 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,850.00 114.53 111.90 93.48 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,573.00 114.02 113.59 102.37 =============== 208-00106 Sweeping (Sediment Removal) Hour =================================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 20.00 150.00 128.73 157.46 STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 8.00 150.00 252.50 180.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 40.00 150.00 141.67 155.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 40.00 150.00 166.88 120.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 20.00 150.00 151.25 150.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 33.00 150.00 134.70 135.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 160.00 160.00 146.73 170.00 MTCER100-296 MTCE R1 FY18 WEST SIGN REPLAC 01/11/18 20.00 145.00 72.50 10.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 20.00 150.00 152.25 125.00 CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 30.00 217.55 175.00 175.00 ITSSW01-833 ABOUT 1.5 MILES NORTH OF THE 01/18/18 10.00 185.00 137.00 56.00 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 40.00 130.00 124.02 140.00 NHPP5502-088 US 550 RIVERSIDE SNOW SHED LI 01/25/18 20.00 150.00 171.75 120.75 ER1151-033 PR SH 115-MP 34.7 01/25/18 34.00 120.00 166.71 250.00 ER1151-034 PR SH 115-MP 40.5 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 134 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00106 Sweeping (Sediment Removal) Hour =================================================== NH0242-086 PR US24 MONTESSORI WALL MP 29 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 120.00 115.00 169.84 150.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 120.00 100.00 169.70 163.51 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 24.00 150.00 157.27 150.00 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 40.00 150.00 148.75 200.00 ER144A-002 SH 144 East and West of Goodr 03/08/18 80.00 140.00 118.80 125.00 NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 20.00 200.00 144.27 80.32 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 40.00 130.00 150.03 126.00 NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 8.00 150.00 3183.33 310.00 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 150.00 223.07 175.00 175.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 10.00 160.00 175.00 170.00 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 30.00 170.00 205.60 118.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,137.00 152.57 161.99 154.03 NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPL 04/05/18 20.00 150.00 125.67 77.00 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 40.00 140.00 113.74 100.20 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 100.00 160.00 190.00 160.00 STAR400-347 Various intersections across 04/12/18 23.00 140.00 65.67 29.00 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 20.00 140.00 125.50 100.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 40.00 170.00 133.53 49.50 STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 1.00 200.00 227.50 175.00 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 10.00 130.00 159.00 125.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 150.00 150.00 130.92 170.00 FSA0711-020 SH 71 & SH 94: PUNKIN CENTER 05/03/18 20.00 140.00 147.33 92.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 75.00 150.00 156.04 219.16 MTCE R100-312 R1 CHIP SEAL 05/17/18 35.00 120.00 135.00 135.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 24.00 135.00 124.17 112.50 ER055A-001 PR SH 55 FLOOD REPAIR 2015 06/28/18 30.00 150.00 139.33 205.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 588.00 148.66 137.20 144.51 NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 50.00 155.00 180.00 180.00 FBR060A-022 SH 60 over the South Platte 07/12/18 80.00 120.00 159.22 135.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 10.00 120.00 140.89 87.50 SHE0701-245 I-70 MEDIAN CABLE RAIL INSTAL 07/12/18 40.00 185.00 100.00 100.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 50.00 140.00 163.33 160.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 10.00 150.00 128.27 194.80 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 2,250.00 166.70 166.70 166.70 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 30.00 176.00 185.39 125.00 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 10.00 165.00 255.00 200.00 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 30.00 150.00 128.25 158.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 135 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00106 Sweeping (Sediment Removal) Hour =================================================== BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 40.00 160.00 134.91 135.00 STA052A-040 SH 52: Antelope Creek 08/23/18 40.00 140.00 124.17 65.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 81.00 145.00 127.81 170.00 NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 50.00 45.00 45.00 45.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 30.00 140.00 147.28 130.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 6.00 150.00 143.75 125.00 STMR200-246 R2–2018 CRITICAL CULVERTS REP 09/20/18 10.00 150.00 125.00 125.00 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 35.00 255.00 116.50 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,852.00 162.16 154.25 158.75 NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 50.00 145.00 139.00 160.00 BR1131-006 SH 113 AT MP 11.5 10/11/18 10.00 125.00 126.57 87.50 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 32.00 150.00 95.00 72.00 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 40.00 150.00 145.00 150.00 SHE2254-092 SH225 AND 17TH PLACE IMPROVEM 10/18/18 20.00 154.03 123.33 75.00 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 20.00 150.00 127.11 69.40 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 10.00 150.00 157.60 140.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 160.00 135.00 147.00 180.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 60.00 135.00 207.31 300.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 236.00 130.00 97.17 95.00 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 40.00 140.00 177.66 195.32 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 50.00 110.00 168.33 5.00 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 100.00 150.00 120.69 10.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 150.00 160.00 138.67 100.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 120.00 135.00 145.85 96.80 ER052A-039 SH 170 11/15/18 20.00 135.00 152.00 133.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 200.00 194.25 207.90 207.90 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 30.00 100.00 184.47 220.87 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 30.00 150.00 128.00 160.00 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 8.00 150.00 207.50 300.00 C R500-198 R5 GUARDRAIL REPLACEMENT/UPGR 11/29/18 40.00 175.00 155.00 125.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 160.00 140.00 188.51 200.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 120.00 150.00 122.12 50.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 40.00 110.00 177.79 175.88 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 140.00 170.00 172.69 215.00 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 12.00 110.00 145.39 120.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 120.00 155.00 174.66 94.62 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 73.00 160.00 80.00 80.00 STAR100-279 FY20 HMA PREVENTATIVE MAINTEN 12/13/18 70.00 150.00 120.00 140.00 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 60.00 170.00 133.93 130.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 2,100.00 157.05 157.05 157.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,321.00 153.09 149.28 145.94 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,898.00 155.64 151.92 150.98 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 136 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00107 Rem Trash Hour =================================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 8.00 100.00 137.25 80.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 20.00 55.00 113.33 125.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 40.00 80.00 126.63 200.00 ER1151-033 PR SH 115-MP 34.7 01/25/18 30.00 63.33 59.11 46.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 39.00 62.00 119.54 115.45 C0703-440 AVALANCHE CONTROL SYSTEM: EJM 02/01/18 20.00 250.00 112.85 110.00 NHPP5502-096 US550 STRIPING & RUMBLE STRIP 03/01/18 20.00 60.00 109.50 83.00 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 24.00 125.00 106.00 175.00 NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 20.00 90.00 103.67 138.16 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 10.00 40.00 101.48 105.00 NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 8.00 100.00 143.33 45.00 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 20.00 187.90 200.00 200.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 10.00 110.00 190.00 180.00 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 30.00 125.00 89.63 54.88 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 299.00 101.09 110.65 122.75 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 20.00 100.00 98.20 65.00 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 130.00 55.00 66.29 113.95 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 40.00 87.00 48.55 29.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 10.00 150.00 80.68 51.70 STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 1.00 200.00 104.25 42.00 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 4.00 100.00 91.13 63.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 25.00 40.00 164.84 164.37 MTCE R100-312 R1 CHIP SEAL 05/17/18 10.00 105.00 150.00 150.00 ER055A-001 PR SH 55 FLOOD REPAIR 2015 06/28/18 30.00 50.00 78.56 175.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 270.00 67.70 73.81 107.20 NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 5.00 150.00 55.00 55.00 FBR060A-022 SH 60 over the South Platte 07/12/18 40.00 40.00 144.50 100.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 10.00 80.00 78.31 37.50 SHE0701-245 I-70 MEDIAN CABLE RAIL INSTAL 07/12/18 20.00 30.00 100.00 100.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 20.00 50.00 75.83 95.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 10.00 118.00 276.38 279.15 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 10.00 100.00 113.50 42.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 50.00 97.00 90.43 100.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 121.00 90.00 57.97 70.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 137 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00107 Rem Trash Hour =================================================== NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 5.00 55.00 45.00 45.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 30.00 87.00 109.20 75.00 STMR200-246 R2–2018 CRITICAL CULVERTS REP 09/20/18 40.00 75.00 45.00 45.00 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 8.00 123.00 97.75 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 369.00 80.05 98.90 82.67 NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 5.00 100.00 180.00 175.00 BR1131-006 SH 113 AT MP 11.5 10/11/18 10.00 75.00 71.94 37.50 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 40.00 80.00 137.50 80.00 SHE2254-092 SH225 AND 17TH PLACE IMPROVEM 10/18/18 5.00 122.75 99.67 54.00 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 10.00 100.00 153.90 181.58 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 80.00 130.00 122.03 71.10 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 10.00 70.00 134.80 220.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 40.00 90.00 78.81 70.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 40.00 85.00 61.51 45.00 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 50.00 270.00 59.00 40.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 150.00 90.00 106.50 75.00 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 10.00 65.00 200.12 126.47 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 20.00 45.00 69.00 125.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 20.00 50.00 161.79 75.38 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 5.00 100.00 119.13 125.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 140.00 100.00 97.41 52.00 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 12.00 30.00 133.45 55.00 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 20.00 120.00 43.33 40.00 STAR100-279 FY20 HMA PREVENTATIVE MAINTEN 12/13/18 20.00 100.00 82.50 45.00 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 20.00 115.00 83.57 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 707.00 106.47 100.11 69.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,645.00 93.20 94.60 88.43 =============== 208-00200 Erosion Control Management LUMP SUM =============================================== C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 1.00 840611.70 840611.70 840611.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 840611.70 840611.70 840611.70 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 1141169.40 1141169.40 1141169.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1141169.40 1141169.40 1141169.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 990890.55 990890.55 990890.55 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 138 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00207 Erosion Control Management Day ==================================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 7.00 200.00 744.35 888.70 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 35.00 275.00 88.33 50.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 13.00 500.00 731.03 795.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 36.00 250.00 618.75 300.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 198.00 165.00 91.59 50.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 60.00 230.00 182.61 48.00 MTCER100-296 MTCE R1 FY18 WEST SIGN REPLAC 01/11/18 12.00 300.00 151.75 30.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 60.00 250.00 307.75 150.00 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 66.00 300.00 129.85 92.50 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 169.00 250.00 186.91 100.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 290.00 250.00 143.62 164.37 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 90.00 250.00 346.15 205.70 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 90.00 200.00 434.09 280.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 169.00 250.00 169.50 50.00 NHPP5502-096 US550 STRIPING & RUMBLE STRIP 03/01/18 8.00 225.00 372.50 390.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 220.00 190.00 223.00 25.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 40.00 215.00 269.90 410.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 30.00 150.00 420.20 336.00 NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 20.00 250.00 940.00 160.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 20.00 200.00 391.18 282.35 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 60.00 250.00 225.00 325.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,693.00 230.12 216.96 140.30 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 90.00 300.00 564.10 510.00 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 33.00 300.00 207.43 158.31 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 96.00 300.00 111.75 100.00 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 60.00 150.00 130.00 100.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 85.00 200.00 183.75 302.50 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 86.00 260.00 135.92 53.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 5.00 220.00 318.75 225.00 NHPP0703-436 EJMT PLENUM WATERPROOFING MEM 06/28/18 50.00 150.00 370.50 435.00 ER055A-001 PR SH 55 FLOOD REPAIR 2015 06/28/18 20.00 200.00 343.57 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 525.00 241.26 241.85 234.04 FBR060A-022 SH 60 over the South Platte 07/12/18 155.00 175.00 183.88 100.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 18.00 225.00 282.00 110.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 139 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00207 Erosion Control Management Day ==================================================== SHE0701-245 I-70 MEDIAN CABLE RAIL INSTAL 07/12/18 40.00 200.00 165.00 165.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 12.00 200.00 346.67 180.00 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 30.00 250.00 325.55 80.00 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 70.00 250.00 230.00 150.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 172.00 173.00 97.29 225.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 161.00 300.00 172.81 300.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 30.00 250.00 178.91 200.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 191.00 100.00 156.20 25.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 10.00 250.00 426.00 190.00 STMR200-246 R2–2018 CRITICAL CULVERTS REP 09/20/18 40.00 175.00 175.00 175.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 929.00 194.54 161.50 156.96 BR1131-006 SH 113 AT MP 11.5 10/11/18 40.00 200.00 199.76 87.50 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 150.00 150.00 489.10 167.30 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 54.00 200.00 216.16 230.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 60.00 185.00 262.71 210.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 472.00 190.00 218.90 425.00 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 30.00 180.00 691.33 682.66 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 75.00 200.00 205.72 267.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 300.00 220.00 211.29 78.71 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 30.00 150.00 205.53 211.75 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 230.00 336.53 344.27 344.27 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 45.00 250.00 227.93 258.70 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 23.00 80.00 247.00 250.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 15.00 225.00 315.07 210.00 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 50.00 50.00 218.14 125.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 365.00 250.00 237.63 85.50 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 75.00 375.00 480.34 713.35 STA052A-045 SH 52B NEW RAYMER SOUTH 12/13/18 30.00 250.00 361.67 520.00 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 100.00 250.00 122.86 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,144.00 224.45 245.54 254.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,291.00 222.68 214.49 198.86 =============== 208-00300 Temporary Berms Lin Foot =============================================== ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 412.00 15.00 3.60 2.50 STA0342-060 US 34D OVERLAY AND BRIDGE WOR ER144A-002 SH 144 East and West of Goodr 03/08/18 8,485.00 4.50 1.93 0.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8,897.00 4.99 1.97 0.45 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 140 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00300 Temporary Berms Lin Foot =============================================== FBR060A-022 SH 60 over the South Platte 07/12/18 3,500.00 3.00 2.76 2.50 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 8,500.00 3.36 3.36 3.36 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12,000.00 3.26 2.86 3.11 BR1131-006 SH 113 AT MP 11.5 10/11/18 800.00 5.50 6.63 6.25 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 350.00 2.00 5.82 6.27 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 319,750.00 1.00 0.79 0.48 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 14,445.00 3.36 3.36 3.36 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 335,345.00 1.11 0.88 0.62 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 356,242.00 1.28 1.05 0.70 =============== 208-00301 Temporary Diversion Lin Foot =============================================== CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 575.00 336.57 350.00 350.00 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 550.00 146.69 200.00 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,125.00 243.74 276.67 276.67 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 1,450.00 275.00 80.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,450.00 275.00 80.00 100.00 M850-027 US24E MANITOU AVE. AT RUXTON 08/28/18 1.00 75000.00 102136.57 64000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 75000.00 102136.57 64000.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 600.00 100.00 56.13 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 600.00 100.00 56.13 18.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,176.00 254.39 134.68 167.21 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 141 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00303 Temporary Diversion (Special) Lin Foot =============================================== ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 250.00 417.19 380.00 380.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 250.00 417.19 380.00 380.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 250.00 417.19 380.00 380.00 =============== 208-00400 Water Control LUMP SUM =============================================== STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 1.00 90000.00 168068.35 50000.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 1.00 80000.00 114312.50 120000.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 1.00 16000.00 19333.33 11000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 62000.00 116524.12 60333.33 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 1.00 80000.00 70812.50 70000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 80000.00 70812.50 70000.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 1.00 10000.00 33242.86 10000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 10000.00 33242.86 10000.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 1.00 50000.00 88791.67 150000.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 66197.97 75855.52 75855.52 STA086A-051 SH 86; WEST OF I-70 11/29/18 1.00 12500.00 20865.73 650.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 42899.32 56446.14 75501.84 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 50587.25 78086.89 60938.19 =============== 208-00520 Temp Stream Crossing LUMP SUM =============================================== CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 1.00 189881.85 225000.00 225000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 189881.85 225000.00 225000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 189881.85 225000.00 225000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 142 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 209-00600 Dust Palliative (Mg Cl) Gallon ================================================= STA052A-040 SH 52: Antelope Creek 08/23/18 20,000.00 1.00 1.28 1.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20,000.00 1.00 1.28 1.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20,000.00 1.00 1.28 1.25 =============== 210-00001 Res Structure Each =================================================== NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 1.00 1250.00 3630.00 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 1250.00 3630.00 3000.00 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 1.00 1000.00 5502.61 565.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 1.00 4000.00 3548.20 3124.81 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 2500.00 4633.98 1844.91 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 2083.33 4382.99 2229.94 =============== 210-00010 Res Mailbox Str Each =================================================== ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 3.00 175.00 294.60 300.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 175.00 294.60 300.00 FBR060A-022 SH 60 over the South Platte 07/12/18 2.00 90.00 331.84 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 90.00 331.84 300.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 1.00 200.00 435.37 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 200.00 435.37 350.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 150.83 328.48 308.33 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 143 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00011 Res Mailbox Str (Ty 1) Each =================================================== NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 13.00 300.00 267.07 350.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 13.00 200.00 207.91 290.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 26.00 250.00 227.63 320.00 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 1.00 230.00 255.00 175.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 10.00 300.00 254.58 251.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 11.00 293.64 254.64 244.32 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 37.00 262.97 232.58 297.50 =============== 210-00012 Res Mailbox Str (Ty 2) Each =================================================== ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 3.00 350.00 256.81 360.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 350.00 256.81 360.00 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 3.00 450.00 390.00 400.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 2.00 500.00 509.17 502.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 470.00 449.58 441.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 425.00 321.07 410.63 =============== 210-00013 Res Mailbox Str (Ty 3) Each =================================================== STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 7.00 500.00 621.54 600.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 3.00 450.00 342.22 559.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 14.00 500.00 441.47 465.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 24.00 493.75 466.10 516.13 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 1.00 550.00 375.00 250.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 144 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00013 Res Mailbox Str (Ty 3) Each =================================================== STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 1.00 700.00 611.00 603.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 625.00 463.50 426.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26.00 503.85 465.92 509.23 =============== 210-00014 Res Mailbox Str (Ty 4) Each =================================================== NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 30.00 600.00 501.88 450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 30.00 600.00 501.88 450.00 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 44.00 500.00 450.00 600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 44.00 500.00 450.00 600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 74.00 540.54 479.93 539.19 =============== 210-00015 Res End Section Each =================================================== NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 4.00 800.00 1275.63 465.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 800.00 1275.63 465.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 800.00 1275.63 465.00 =============== 210-00035 Res Water Meter Each =================================================== STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 6.00 1500.00 1490.00 750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 1500.00 1490.00 750.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 1500.00 1490.00 750.00 =============== 210-00050 Res Fire Hydrant Each =================================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 9060.92 9062.50 9062.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 145 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00050 Res Fire Hydrant Each =================================================== STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 1.00 4000.00 4103.96 3000.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 5.00 3000.00 4930.66 1132.13 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 7.00 4008.70 4963.66 2531.88 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 4008.70 4963.66 2531.88 =============== 210-00066 Reset Monument Box Each =================================================== STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 11.00 500.00 964.06 600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 11.00 500.00 964.06 600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 500.00 964.06 600.00 =============== 210-00090 Res Delineator Each =================================================== SHE0701-245 I-70 MEDIAN CABLE RAIL INSTAL 07/12/18 25.00 30.00 42.00 42.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 25.00 30.00 42.00 42.00 C R500-198 R5 GUARDRAIL REPLACEMENT/UPGR 11/29/18 42.00 40.00 31.13 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 42.00 40.00 31.13 30.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 67.00 36.27 33.62 34.48 =============== 210-00300 Res Brick Pavers Sq Yard ================================================ NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 9.00 100.00 100.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9.00 100.00 100.00 100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 100.00 100.00 100.00 =============== 210-00420 Res Timbers LUMP SUM =============================================== ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 1.00 5000.00 6551.25 12000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 146 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00420 Res Timbers LUMP SUM =============================================== STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 5000.00 6551.25 12000.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 1.00 5000.00 3666.67 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 5000.00 3666.67 5000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 5000.00 5315.00 8500.00 =============== 210-00425 Res Bridge Railing Lin Foot =============================================== NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 39.00 180.00 351.17 55.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 482.00 50.00 48.47 90.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 179.00 70.00 73.11 49.19 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 700.00 62.36 71.50 77.61 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 700.00 62.36 71.50 77.61 =============== 210-00442 Patch Bridge Curb Lin Foot =============================================== STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 7.00 120.00 125.71 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 7.00 120.00 125.71 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 120.00 125.71 50.00 =============== 210-00473 Res TV Cameras Each =================================================== C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 1.00 5828.04 5828.04 5828.04 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 5828.04 5828.04 5828.04 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 1.00 1000.00 1151.54 1100.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 5769.75 5769.75 5769.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 3384.88 2075.18 3434.88 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 4199.26 2700.66 4232.60 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 147 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00475 Res CCTV Pole Each =================================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 5.00 6125.70 6125.70 6125.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 6125.70 6125.70 6125.70 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 6125.70 6125.70 6125.70 =============== 210-00476 Reset MVRD Each =================================================== STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 2.00 1450.00 1126.00 1600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 1450.00 1126.00 1600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1450.00 1126.00 1600.00 =============== 210-00479 Res Radio Com Antenna Each =================================================== NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPL 04/05/18 1.00 750.00 707.67 673.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 750.00 707.67 673.00 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 2.00 750.00 1163.25 1195.50 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 2.00 750.00 883.75 750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 750.00 976.92 972.75 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 4.00 750.00 792.11 785.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 750.00 792.11 785.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 750.00 848.23 856.00 =============== 210-00500 Reb Port Present Str Each =================================================== ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 2.00 2000.00 5781.25 7500.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 148 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00500 Reb Port Present Str Each =================================================== STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 2000.00 5781.25 7500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 2000.00 5781.25 7500.00 =============== 210-00520 Reb Port Present Str Sq Yard ================================================ STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 47.00 4000.00 2792.06 1600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 47.00 4000.00 2792.06 1600.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 1.00 2000.00 5161.53 9884.60 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 2.00 4500.00 2845.00 690.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 3666.67 3837.80 3754.87 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 3980.00 2829.60 1729.29 =============== 210-00530 Rebuild Port of Present Str Sq Foot ================================================ ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 2,195.00 165.00 59.99 84.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,195.00 165.00 59.99 84.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 60.00 430.00 646.15 624.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 60.00 430.00 646.15 624.60 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 3.00 200.00 1575.67 1575.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 200.00 1575.67 1575.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,258.00 172.09 73.74 100.35 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 149 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00750 Res Light Standard Each =================================================== SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 3.00 1000.00 1433.33 1400.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 15.00 800.00 1406.99 1448.81 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 4.00 1500.00 2272.50 2350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 22.00 954.55 1465.69 1606.01 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 4.00 2000.00 955.64 690.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 2.00 2000.00 1285.72 1300.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 1.00 2000.00 4381.04 4361.28 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 4.00 1400.00 2798.81 2575.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 1.00 2250.00 3106.88 3000.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 2199.75 2199.75 2199.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 13.00 1849.98 2172.90 1940.08 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 35.00 1287.14 1690.89 1730.09 =============== 210-00760 Res Luminaire Each =================================================== STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 9.00 395.00 348.33 275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9.00 395.00 348.33 275.00 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 2.00 500.00 289.50 352.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 500.00 289.50 352.00 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 3.00 350.00 265.52 255.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 231.00 231.00 231.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 320.25 263.36 249.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15.00 389.07 314.40 278.33 =============== 210-00810 Res Ground Sign Each =================================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 1.00 350.00 515.25 630.49 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 150 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00810 Res Ground Sign Each =================================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 1.00 300.00 542.50 500.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 1.00 300.00 165.50 79.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 9.00 300.00 132.80 105.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 1.00 250.00 303.26 450.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 5.00 250.00 314.44 272.29 STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 8.00 200.00 203.33 225.00 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 1.00 300.00 472.39 800.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 1.00 250.00 312.16 450.00 ER144A-002 SH 144 East and West of Goodr 03/08/18 2.00 250.00 429.15 350.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 9.00 200.00 344.00 394.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 7.00 150.00 88.50 92.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 46.00 231.52 276.71 258.82 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 5.00 200.00 216.40 122.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 1.00 280.00 364.82 240.00 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 30.00 250.00 532.50 390.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 36.00 243.89 458.88 348.61 NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 3.00 300.00 500.00 500.00 FBR060A-022 SH 60 over the South Platte 07/12/18 9.00 250.00 242.59 185.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 3.00 325.00 273.33 290.00 C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 1.00 250.00 415.00 610.00 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 7.00 175.00 294.88 291.50 STM0252-469 R2 ADA RAMPS I-25 INT S NEV- 09/06/18 3.00 261.00 360.00 450.00 NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 4.00 250.00 750.00 750.00 NHPP070A-032 I-70B & Z GRAND JCT PHASE 1 A 09/20/18 8.00 250.00 291.00 200.00 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 9.00 260.00 396.00 235.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 47.00 249.43 298.69 313.84 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 2.00 200.00 180.00 175.00 SHER200-243 R2 WRONG WAY PREVENTION 10/18/18 77.00 400.00 225.00 250.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 2.00 260.00 322.38 312.15 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 3.00 250.00 229.11 165.00 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 1.00 400.00 375.00 270.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 5.00 250.00 103.00 165.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 151 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00810 Res Ground Sign Each =================================================== C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 8.00 200.00 150.68 212.40 ER052A-039 SH 170 11/15/18 2.00 250.00 229.83 133.00 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 10.00 400.00 250.00 250.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 3.00 410.41 378.86 378.86 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 3.00 300.00 274.87 435.47 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 13.00 300.00 287.00 350.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 27.00 280.00 310.03 285.00 C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 3.00 250.00 260.40 347.00 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 7.00 200.00 273.00 320.00 MPR200-252 REGION 2 - PUEBLO COUNTY HIGH 12/20/18 1.00 300.00 350.00 225.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 167.00 336.89 241.92 266.31 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 296.00 295.32 284.71 282.70 =============== 210-00815 Res Sign Panel Each =================================================== BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 8.00 280.00 150.36 58.83 STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 1.00 125.00 118.33 125.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 15.00 150.00 69.34 41.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E MTCER500-201 R5 FY18 SIGN REPLACEMENT 03/08/18 6.00 100.00 64.00 35.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 7.00 200.00 1426.14 2052.27 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 7.00 250.00 197.50 205.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 44.00 190.11 170.74 391.40 NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPL 04/05/18 3.00 30.00 146.00 197.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 8.00 180.00 103.38 131.50 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 12.00 200.00 118.00 118.00 MTCER300-244 MTCE R3 FY 18/19 REGIONWIDE S 05/31/18 5.00 60.00 106.67 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 28.00 151.07 112.32 127.11 SHE0701-245 I-70 MEDIAN CABLE RAIL INSTAL 07/12/18 15.00 150.00 150.00 150.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 5.00 185.00 90.52 35.00 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 2.00 400.00 1057.25 175.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 22.00 180.68 239.24 126.14 SHER200-243 R2 WRONG WAY PREVENTION 10/18/18 264.00 40.00 37.50 45.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 152 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00815 Res Sign Panel Each =================================================== SHE2254-092 SH225 AND 17TH PLACE IMPROVEM 10/18/18 2.00 391.40 1583.33 1200.00 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 5.00 250.00 185.00 90.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 2.00 350.00 1088.63 175.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 53.00 135.00 159.41 263.39 STA052A-045 SH 52B NEW RAYMER SOUTH 12/13/18 2.00 125.00 169.67 165.00 MPR200-252 REGION 2 - PUEBLO COUNTY HIGH 12/20/18 20.00 45.00 59.67 29.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 13.00 58.63 58.63 58.63 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 361.00 61.94 94.27 85.07 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 455.00 85.56 117.72 119.27 =============== 210-00816 Res Sign Panel (Spec) Each =================================================== C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 1.00 2625.00 2625.00 2625.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 2625.00 2625.00 2625.00 NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 1.00 500.00 2056.00 800.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 17.00 3442.56 3442.56 3442.56 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 18.00 3279.08 3296.61 3295.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19.00 3244.66 3263.03 3260.45 =============== 210-00820 Res Var Mesg Sign Each =================================================== C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 1.00 35159.09 35159.09 35159.09 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 35159.09 35159.09 35159.09 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 1.00 5000.00 26889.63 26000.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 45307.50 45307.50 45307.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 25153.75 30573.21 35653.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 28488.86 31337.52 35488.86 =============== 210-00825 Res Flashing Beacon Each =================================================== ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 1.00 1500.00 1869.40 1405.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 153 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00825 Res Flashing Beacon Each =================================================== STA0342-060 US 34D OVERLAY AND BRIDGE WOR -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1500.00 1869.40 1405.00 FSA0711-020 SH 71 & SH 94: PUNKIN CENTER 05/03/18 4.00 1400.00 2166.67 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 1400.00 2166.67 3000.00 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 2.00 2000.00 1141.67 750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 2000.00 1141.67 750.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 1585.71 1834.65 2129.29 =============== 210-00827 Res Pull Box Each =================================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 4.00 500.00 607.50 700.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 1.00 750.00 1066.67 1100.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 1.00 785.00 863.80 335.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 1.00 750.00 3265.63 252.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 1.00 300.00 602.50 400.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 573.13 1080.77 610.88 C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 3.00 500.00 961.50 446.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 2.00 550.00 1309.38 700.00 STM0252-469 R2 ADA RAMPS I-25 INT S NEV- 09/06/18 5.00 465.00 925.00 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 492.50 1042.10 773.80 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 14.00 740.56 735.00 735.00 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 5.00 550.00 269.78 296.12 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 154 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00827 Res Pull Box Each =================================================== C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 3.00 450.00 314.40 312.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 22.00 657.63 416.36 577.57 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 599.45 765.66 633.29 =============== 210-00831 Res Traf Sig Head Each =================================================== FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 5.00 200.00 255.12 296.21 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 200.00 255.12 296.21 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 200.00 255.12 296.21 =============== 210-00840 Res Traf Sig Pole Each =================================================== FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 1.00 3000.00 4870.19 5937.76 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 3081.75 3081.75 3081.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 3040.88 4512.50 4509.76 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 3040.88 4512.50 4509.76 =============== 210-00842 Res Traf Sig Mast Arm Each =================================================== FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 2.00 750.00 542.71 444.32 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 750.00 542.71 444.32 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 750.00 542.71 444.32 =============== 210-00847 Res Trav Time Ind Each =================================================== C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 3.00 4604.09 4604.09 4604.09 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 4604.09 4604.09 4604.09 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 6.00 1200.00 5039.05 4900.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 155 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00847 Res Trav Time Ind Each =================================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 8.00 4558.05 4558.05 4558.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 14.00 3118.89 4918.80 4704.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17.00 3380.98 4891.83 4686.86 =============== 210-00855 Res Traf Sig Control Cab Each =================================================== NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 1.00 3000.00 5416.67 1400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 3000.00 5416.67 1400.00 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 1.00 4100.00 5073.33 5900.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 2.00 4620.00 4620.00 4620.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 4446.67 4892.00 5046.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 4085.00 5088.75 4135.00 =============== 210-00859 Mod Ped Push Button Each =================================================== STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 5.00 100.00 216.03 296.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 100.00 216.03 296.12 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 100.00 216.03 296.12 =============== 210-00860 Res Ped Push Button Each =================================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 7.00 500.00 345.00 200.00 STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 1.00 145.00 416.67 175.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 455.63 357.65 196.88 C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 13.00 125.00 235.50 88.00 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 33.00 250.00 166.75 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 46.00 214.67 186.18 64.33 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 156 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00860 Res Ped Push Button Each =================================================== STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 18.00 100.00 49.29 52.26 C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 17.00 110.00 63.40 65.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 4.00 100.00 79.74 80.22 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 39.00 104.36 59.04 60.68 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 93.00 189.14 135.16 74.20 =============== 210-00861 Reset Wiring LUMP SUM =============================================== FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 1.00 5000.00 7799.83 9392.31 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 5000.00 7799.83 9392.31 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5000.00 7799.83 9392.31 =============== 210-00865 Res Ped Sig Head Each =================================================== STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 1.00 175.00 170.00 225.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 175.00 170.00 225.00 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 4.00 250.00 439.00 538.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 250.00 439.00 538.00 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 2.00 250.00 81.32 87.09 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 4.00 250.00 131.87 80.22 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 250.00 115.02 82.51 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 243.18 193.78 261.10 =============== 210-00866 Res Fire Preempt Unit+Timer Each =================================================== NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPL 04/05/18 2.00 3500.00 506.67 380.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 3500.00 506.67 380.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 157 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00866 Res Fire Preempt Unit+Timer Each =================================================== STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 3.00 1000.00 937.00 856.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 1000.00 937.00 856.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 2000.00 721.83 665.60 =============== 210-00867 Res Fire Preempt Unit Each =================================================== NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 1.00 1000.00 457.50 475.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1000.00 457.50 475.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 3.00 1000.00 401.24 399.97 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 1000.00 401.24 399.97 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 1.00 1000.00 566.00 750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1000.00 566.00 750.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 1000.00 444.11 484.98 =============== 210-00890 Res Int Detect Sys (Camera) Each =================================================== STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 1.00 1100.00 818.33 1025.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1100.00 818.33 1025.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1100.00 818.33 1025.00 =============== 210-01000 Res Fence Lin Foot =============================================== STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 190.00 10.00 8.22 7.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 158 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-01000 Res Fence Lin Foot =============================================== ER1151-033 PR SH 115-MP 34.7 01/25/18 160.00 8.50 6.58 7.50 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 110.00 30.00 27.05 22.87 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 60.00 30.00 27.52 40.00 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 30.00 35.00 455.75 430.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 1,180.00 8.00 9.08 8.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,730.00 10.90 14.75 17.22 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 171.00 35.00 9.00 10.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 60.00 18.00 14.40 7.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 231.00 30.58 11.61 9.40 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 100,376.00 2.00 1.82 0.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 100,376.00 2.00 1.82 0.45 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 1,600.00 20.00 5.88 5.64 NHPP0702-366 I-70 Avon to Vail 11/08/18 614.00 20.00 49.25 115.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 100.00 50.00 18.67 20.11 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 122.00 40.00 13.25 20.00 ER052A-039 SH 170 11/15/18 40.00 15.00 24.65 6.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 132.00 20.00 5.38 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,608.00 22.01 18.71 32.59 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 104,945.00 2.71 2.83 1.54 =============== 210-01011 Res Gate Each =================================================== NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 1.00 450.00 423.33 600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 450.00 423.33 600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 450.00 423.33 600.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 159 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-01050 Res C L Fence Lin Foot =============================================== NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 150.00 15.00 17.45 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 150.00 15.00 17.45 14.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 39.00 50.00 70.33 65.00 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 60.00 15.00 27.86 27.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 99.00 28.79 43.06 41.97 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 249.00 20.48 35.00 25.12 =============== 210-01130 Res Gdrail Ty 3 Lin Foot =============================================== ER1151-033 PR SH 115-MP 34.7 01/25/18 103.00 12.00 38.46 38.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 103.00 12.00 38.46 38.00 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 63.00 60.00 307.23 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 63.00 60.00 307.23 150.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 166.00 30.22 140.46 80.51 =============== 210-01170 Res Gdrail Ty 7 Lin Foot =============================================== FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 400.00 15.00 16.89 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 400.00 15.00 16.89 5.00 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 16.00 120.00 305.00 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16.00 120.00 305.00 140.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 160 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-01170 Res Gdrail Ty 7 Lin Foot =============================================== NHPP0702-366 I-70 Avon to Vail 11/08/18 100.00 10.00 41.95 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 100.00 10.00 41.95 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 516.00 17.29 26.64 17.91 =============== 210-01180 Reset Guardrail (Special) Lin Foot =============================================== NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 450.00 20.00 83.33 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 450.00 20.00 83.33 15.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 450.00 20.00 83.33 15.00 =============== 210-01190 Reset Tensioned Cable Barrier Lin Foot =============================================== NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 200.00 15.00 219.75 239.50 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 44,138.00 17.59 17.59 17.59 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 44,338.00 17.58 19.41 18.59 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 44,338.00 17.58 19.41 18.59 =============== 210-01200 Res End Anchorage Each =================================================== NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 1.00 1830.00 3988.33 1500.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 12.00 6053.94 6053.94 6053.94 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 13.00 5729.02 5365.40 5703.64 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13.00 5729.02 5365.40 5703.64 =============== 210-01710 Res Valve Each =================================================== STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 5.00 600.00 1560.00 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 600.00 1560.00 500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 600.00 1560.00 500.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 161 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-02510 Relay Sprinkler System LUMP SUM =============================================== STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 1.00 500.00 3091.67 275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 500.00 3091.67 275.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 1.00 4000.00 12000.00 12000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 4000.00 12000.00 12000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 3125.00 7545.83 9068.75 =============== 210-02804 Grinding: Sidwlk and/or Curb Ramp Repair Lin Foot =============================================== C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 75.00 30.00 45.75 13.00 NHPP070A-032 I-70B & Z GRAND JCT PHASE 1 A 09/20/18 852.00 50.00 6.50 4.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 927.00 48.38 12.38 5.19 C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 43.00 50.00 44.60 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 43.00 50.00 44.60 20.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 970.00 48.45 15.50 5.84 =============== 210-02900 Relay Riprap Cubic Yard ============================================= ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 12.00 50.00 120.97 60.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12.00 50.00 120.97 60.00 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 35.00 60.00 72.37 90.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 80.00 49.04 49.05 49.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 115.00 52.38 65.05 61.51 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 127.00 52.15 80.34 61.37 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 162 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-04010 Adj Manhole Each =================================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 22.00 500.00 2800.00 4500.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 14.00 600.00 1022.40 1500.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 3.00 1500.00 1810.86 2139.26 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 2.00 1000.00 950.00 900.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 6.00 1000.00 738.03 700.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 1.00 800.00 980.00 860.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 48.00 681.25 1439.28 2776.62 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 90.00 550.00 526.26 350.03 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 1.00 1200.00 5500.00 5500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 91.00 557.14 540.04 406.62 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 9.00 800.00 1278.70 900.00 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 3.00 900.00 525.00 225.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.00 825.00 1090.28 731.25 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 4.00 765.00 1213.00 1050.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 1.00 1000.00 1065.83 575.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 5.00 2984.78 2985.29 2985.29 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 101.00 600.00 741.45 718.81 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 1.00 714.00 2010.00 500.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 160.00 500.00 714.06 400.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 6.00 1000.00 1262.31 2288.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 278.00 598.19 766.35 613.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 429.00 605.12 803.53 814.89 =============== 210-04015 Modify Manhole Each =================================================== NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 1.00 2000.00 7500.00 7500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 2000.00 7500.00 7500.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 163 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-04015 Modify Manhole Each =================================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 2.00 2984.78 2985.29 2985.29 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 1.00 3500.00 2627.81 2288.25 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 2940.00 2940.00 2940.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 3102.39 2774.55 2799.71 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 2881.91 3365.23 3739.77 =============== 210-04016 Modify Manhole (Spec) Each =================================================== STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 20.00 2500.00 1416.58 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 20.00 2500.00 1416.58 1000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 2500.00 1416.58 1000.00 =============== 210-04020 Modify Inlet Each =================================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 1.00 1800.00 1751.40 1502.79 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 1.00 3220.00 2412.00 2000.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 30.00 2800.00 5560.56 2813.14 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 2.00 4000.00 2700.00 3200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 34.00 2853.53 5403.08 2773.44 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 5.00 85.00 1900.00 2200.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 1.00 3000.00 4208.82 3835.29 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 1.00 4000.00 8000.00 8000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7.00 1060.71 2922.35 3262.18 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 10.00 2625.00 2625.00 2625.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 2625.00 2625.00 2625.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 164 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-04020 Modify Inlet Each =================================================== NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 3.00 3400.00 15087.50 13000.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 6.00 3100.00 3854.94 840.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 9.00 2000.00 4655.67 2120.00 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 9.00 1500.00 3500.00 3500.00 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 3.00 2000.00 7802.34 8209.34 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 5.00 3000.00 3320.00 5000.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 7.00 2625.00 2625.00 2625.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 42.00 2373.21 4865.90 3871.98 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 93.00 2477.10 5054.54 3290.38 =============== 210-04025 Modify Structure Each =================================================== BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 2.00 1600.00 5485.50 6066.98 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 2.00 2000.00 4131.55 6000.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 1800.00 4763.40 6033.49 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 2.00 5000.00 17314.96 15000.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 1.00 4500.00 5553.35 6000.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 7.00 3675.00 3675.00 3675.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 4022.50 10528.00 6172.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 3387.50 7137.06 6132.78 =============== 210-04035 Modify Guardrail (Spec) Lin Foot =============================================== BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 4,561.00 18.00 16.63 16.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,561.00 18.00 16.63 16.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,561.00 18.00 16.63 16.15 =============== 210-04050 Adj Valve Box Each =================================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 6.00 400.00 1557.50 2400.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 165 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-04050 Adj Valve Box Each =================================================== ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 16.00 350.00 474.00 650.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 22.00 363.64 615.33 1127.27 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 154.00 350.00 269.68 188.71 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 4.00 500.00 1800.00 1800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 158.00 353.80 279.55 229.50 NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 1.00 600.00 500.00 500.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 9.00 450.00 1033.30 600.00 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 8.00 500.00 393.75 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 18.00 480.56 728.97 394.44 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 6.00 550.00 414.35 420.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 5.00 400.00 653.29 375.00 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 2.00 550.00 500.00 500.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 6.00 102.34 102.35 102.35 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 91.00 350.00 445.83 262.32 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 170.00 500.00 340.88 200.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 2.00 600.00 592.92 753.76 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 15.00 350.00 498.91 1109.63 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 297.00 438.77 392.63 276.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 495.00 409.83 379.18 303.42 =============== 210-04051 Adj Valve Box (Spec) Each =================================================== NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 2.00 550.00 559.17 425.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 550.00 559.17 425.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 550.00 559.17 425.00 =============== 210-04060 Adj Water Meter Each =================================================== STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 1.00 600.00 1066.48 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 600.00 1066.48 400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 600.00 1066.48 400.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 166 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-04070 Adjust Well Each =================================================== STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 7.00 1400.00 590.32 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 7.00 1400.00 590.32 300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 1400.00 590.32 300.00 =============== 210-04200 Adj Gdrail Lin Foot =============================================== ER1151-033 PR SH 115-MP 34.7 01/25/18 60.00 10.00 134.03 150.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 60.00 10.00 134.03 150.00 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 2,975.00 10.00 11.00 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,975.00 10.00 11.00 10.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,035.00 10.00 15.77 12.77 =============== 211-00100 Drilling Hole Lin Foot =============================================== STA086A-051 SH 86; WEST OF I-70 11/29/18 15.00 200.00 120.52 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 15.00 200.00 120.52 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15.00 200.00 120.52 50.00 =============== 211-01110 Rock Reinf (Dowels) Each =================================================== NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 3.00 600.00 1111.75 1250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 600.00 1111.75 1250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 600.00 1111.75 1250.00 =============== 211-01123 Rock Reinf (Perm A) Lin Foot =============================================== STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 1,310.00 130.00 172.40 155.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,310.00 130.00 172.40 155.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,310.00 130.00 172.40 155.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 167 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 211-01300 Rock Anchor Each =================================================== C0703-440 AVALANCHE CONTROL SYSTEM: EJM 02/01/18 65.00 2000.00 4156.96 1400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 65.00 2000.00 4156.96 1400.00 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 40.00 1000.00 1364.55 1931.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 40.00 1000.00 1364.55 1931.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 105.00 1619.05 2942.87 1602.57 =============== 211-02277 Cement Grout (Voids) Cubic Yard ============================================= NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 3.00 600.00 2408.33 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 600.00 2408.33 3000.00 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 65.00 1000.00 737.63 425.00 STMR200-246 R2–2018 CRITICAL CULVERTS REP 09/20/18 5.00 1500.00 1750.00 1750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 70.00 1035.71 756.73 519.64 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 73.00 1017.81 810.98 621.58 =============== 211-03005 Dewatering LUMP SUM =============================================== ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 1.00 50000.00 134633.53 65000.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 1.00 169112.99 135000.00 135000.00 ER144A-002 SH 144 East and West of Goodr 03/08/18 1.00 50000.00 39861.77 7242.30 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 1.00 415420.11 461700.00 461700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 171133.28 98146.20 167235.58 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 1.00 10000.00 18471.98 7362.85 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 168 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 211-03005 Dewatering LUMP SUM =============================================== ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 1.00 50000.00 29480.36 10272.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 30000.00 23609.22 8817.43 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 124088.85 63206.99 114429.53 =============== 212-00006 Seeding (Native) Acre =================================================== STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 0.80 2000.00 4710.00 14000.00 STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 0.10 5000.00 5250.00 4000.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 0.30 2000.00 2700.00 2700.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 0.50 3000.00 1696.89 1600.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 1.05 4000.00 1372.50 1600.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 5.10 900.00 664.44 455.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 4.30 780.00 943.80 800.00 MTCER100-296 MTCE R1 FY18 WEST SIGN REPLAC 01/11/18 0.10 8000.00 6215.00 100.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 3.30 1500.00 685.97 561.00 CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 0.65 512.29 385.00 385.00 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 1.00 950.00 2829.74 2100.00 ER1151-033 PR SH 115-MP 34.7 01/25/18 0.40 1650.00 1393.77 1350.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 1.20 2000.00 1063.03 1020.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 2.25 801.00 913.64 819.64 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 1.00 1100.00 1354.95 1083.70 C0703-440 AVALANCHE CONTROL SYSTEM: EJM 02/01/18 0.50 5000.00 2800.28 1000.00 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 2.00 2000.00 1240.64 1300.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 2.20 2000.00 1071.72 1090.00 ER144A-002 SH 144 East and West of Goodr 03/08/18 20.00 800.00 639.26 450.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 0.10 2500.00 4992.79 8400.00 NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 1.00 2400.00 4391.67 2500.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 0.50 3000.00 2046.49 1892.97 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 1.60 498.62 384.00 384.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 0.24 2500.00 2167.00 2250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 50.19 1231.06 902.22 986.11 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 0.25 800.00 6791.20 9142.00 STAR400-347 Various intersections across 04/12/18 0.20 5000.00 8046.00 500.00 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 14.00 900.00 630.00 360.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 0.80 5000.00 2227.75 2472.01 STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 0.10 3000.00 15508.75 25000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 169 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00006 Seeding (Native) Acre =================================================== NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 0.33 750.00 1908.25 3000.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 1.70 700.00 908.89 890.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 0.06 10000.00 7000.00 7000.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 0.14 5000.00 3190.48 3571.43 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 0.90 2000.00 9050.00 5750.00 NHPP0761-230 I-76 AND COUNTY ROAD 22 AT FO 06/14/18 0.01 1000.00 34000.00 25000.00 ER055A-001 PR SH 55 FLOOD REPAIR 2015 06/28/18 9.00 900.00 1097.95 825.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 27.49 1118.50 1330.63 1024.96 FBR060A-022 SH 60 over the South Platte 07/12/18 22.00 500.00 497.42 325.00 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 0.30 2500.00 6081.67 6123.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 0.90 2000.00 2164.69 1250.00 SHE0701-245 I-70 MEDIAN CABLE RAIL INSTAL 07/12/18 0.33 2700.00 1200.00 1200.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 1.50 1000.00 2433.33 625.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 2.60 4000.00 1574.47 973.40 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 24.00 698.58 698.58 698.58 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 1.50 902.00 3524.31 2400.00 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 0.74 2500.00 6907.50 900.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 6.70 1300.00 1252.26 1400.00 STA052A-040 SH 52: Antelope Creek 08/23/18 0.40 2000.00 1925.83 2150.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 2.00 800.00 2044.91 2000.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 1.30 1500.00 2363.16 2500.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 5.05 730.00 1259.31 770.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 0.02 10000.00 15328.50 10000.00 STMR200-246 R2–2018 CRITICAL CULVERTS REP 09/20/18 0.48 3000.00 1225.00 1225.00 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 0.10 950.00 11873.75 20000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 69.92 926.65 952.13 846.32 BR1131-006 SH 113 AT MP 11.5 10/11/18 3.00 800.00 764.66 610.00 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 0.05 5000.00 12439.50 4448.00 SHER200-243 R2 WRONG WAY PREVENTION 10/18/18 0.10 10000.00 1925.00 3500.00 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 0.50 2000.00 3889.28 1057.08 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 19.60 990.00 952.22 851.65 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 2.82 900.00 911.52 550.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 0.50 1750.00 2550.00 1530.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 2.60 775.00 1221.82 1215.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 117.50 800.00 313.92 341.25 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 1.00 3000.00 839.46 778.92 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 1.00 1500.00 2755.67 800.00 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 15.00 1500.00 1134.41 1050.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 170 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00006 Seeding (Native) Acre =================================================== NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 0.50 3000.00 2216.67 1000.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 1.60 800.00 781.84 725.70 ER052A-039 SH 170 11/15/18 0.25 2500.00 7373.07 15372.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 4.70 1260.00 1285.71 1285.71 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 0.10 10000.00 8143.32 8623.26 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 0.10 4000.00 6760.00 10000.00 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 0.36 2100.00 1460.00 2370.00 C R500-198 R5 GUARDRAIL REPLACEMENT/UPGR 11/29/18 0.04 10000.00 10471.30 9642.60 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 1.61 1000.00 3305.29 3424.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 0.12 5000.00 4815.66 6000.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 0.05 1500.00 14716.65 10000.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 53.00 750.00 905.56 750.00 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 0.50 2000.00 1236.33 1100.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 0.60 2000.00 1895.22 1419.87 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 0.90 1500.00 1506.67 945.00 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 2.00 800.00 1252.86 2800.00 MPR200-252 REGION 2 - PUEBLO COUNTY HIGH 12/20/18 0.25 10000.00 2533.33 1100.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 24.00 637.50 637.50 637.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 254.35 893.85 764.17 656.90 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 401.95 957.02 887.26 756.13 =============== 212-00009 Seeding (Temporary) Acre =================================================== FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 0.20 5000.00 2465.32 2500.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 0.40 2000.00 1063.25 326.75 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 1.50 1100.00 955.72 960.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.10 1642.86 1115.96 986.05 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 20.00 423.21 423.21 423.21 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20.00 423.21 423.21 423.21 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 37.00 348.21 348.21 348.21 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 37.00 348.21 348.21 348.21 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 59.10 419.59 497.19 396.25 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 171 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00011 Seeding (Lawn) Acre =================================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 0.05 100.00 8110.20 8220.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 0.05 100.00 8110.20 8220.40 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 0.02 2000.00 17681.51 22500.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 0.45 12000.00 2932.50 2000.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 9.50 800.00 1982.14 670.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9.97 1307.92 2083.51 773.82 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.02 1301.90 2098.25 810.98 =============== 212-00012 Seeding (Furnished) Acre =================================================== ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 2.40 26.24 63.00 63.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.40 26.24 63.00 63.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.40 26.24 63.00 63.00 =============== 212-00022 Seeding (Riparian) Acre =================================================== STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 0.40 2500.00 3065.28 6300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 0.40 2500.00 3065.28 6300.00 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 2.64 1000.00 1251.67 730.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.64 1000.00 1251.67 730.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 0.35 8000.00 2708.33 1500.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 0.31 3500.00 5002.00 10374.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 2.00 1040.36 1040.36 1040.36 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.66 2242.75 2970.10 2188.59 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.70 1685.21 2204.98 1801.55 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 172 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00023 Seeding (Upland Forest) Acre =================================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 3.00 653.57 653.57 653.57 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 653.57 653.57 653.57 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 653.57 653.57 653.57 =============== 212-00024 Seeding (Upland Grassland) Acre =================================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 32.00 642.86 642.86 642.86 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 32.00 642.86 642.86 642.86 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 32.00 642.86 642.86 642.86 =============== 212-00028 Seeding (Wetlands) Acre =================================================== NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 0.06 12000.00 18313.75 4755.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 0.10 5175.00 7288.80 4800.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 0.10 3000.00 10713.18 11500.00 ER144A-002 SH 144 East and West of Goodr 03/08/18 0.20 3000.00 3161.43 3750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 0.46 4646.74 6704.74 5794.13 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 1.12 2000.00 1566.67 1000.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 0.05 5000.00 8223.13 1595.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.17 2128.21 2274.80 1025.43 FBR060A-022 SH 60 over the South Platte 07/12/18 0.28 5000.00 3389.39 2750.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 0.01 2100.00 57603.32 18750.00 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 0.10 7000.00 10573.98 12000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 0.39 5438.46 5130.59 5532.05 BR1131-006 SH 113 AT MP 11.5 10/11/18 0.25 2500.00 4944.32 7200.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 173 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00028 Seeding (Wetlands) Acre =================================================== STA086A-051 SH 86; WEST OF I-70 11/29/18 0.05 9000.00 9566.99 13500.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 0.30 4000.00 3313.44 3000.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 2.00 1178.57 1178.57 1178.57 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.60 1781.59 3594.03 2204.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.62 2463.34 4318.71 2544.31 =============== 212-00032 Soil Conditioning Acre =================================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 0.05 15000.00 14110.20 8220.40 STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 0.80 6000.00 7509.99 17000.00 STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 0.10 5000.00 15250.00 11000.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 0.30 3000.00 3700.00 3800.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 0.50 6000.00 535.02 480.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 1.05 4000.00 4087.50 2350.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 5.10 2500.00 2173.96 1695.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 4.30 4000.00 2852.20 2500.00 MTCER100-296 MTCE R1 FY18 WEST SIGN REPLAC 01/11/18 0.10 9000.00 7735.00 100.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 3.30 3500.00 2903.11 2300.00 CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 0.65 7168.01 5410.00 5410.00 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 1.00 5000.00 5572.62 8400.00 ER1151-033 PR SH 115-MP 34.7 01/25/18 0.40 2880.00 3701.50 3800.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 1.20 3500.00 3391.62 2550.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 2.25 1790.00 2380.06 2235.38 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 1.00 3000.00 4412.84 5320.51 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 2.00 3000.00 4531.16 4000.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 2.20 3000.00 3264.70 2850.00 ER144A-002 SH 144 East and West of Goodr 03/08/18 20.00 1850.00 1946.19 1750.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 0.50 2000.00 4930.18 9450.00 NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 1.00 7000.00 5683.33 7000.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 0.50 3000.00 5992.96 5985.91 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 4.00 6757.59 5410.00 5410.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 0.24 2500.00 4129.50 4300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 52.54 3146.54 2571.96 3035.01 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 0.25 2800.00 11814.46 16200.00 STAR400-347 Various intersections across 04/12/18 0.20 7500.00 11546.00 500.00 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 7.00 2700.00 1517.07 342.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 174 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00032 Soil Conditioning Acre =================================================== SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 14.00 3000.00 2525.00 2400.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 0.85 5000.00 2922.95 1008.59 STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 0.10 3000.00 23371.25 40000.00 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 0.33 4000.00 6648.43 6000.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 1.70 2900.00 2442.22 2600.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 0.06 7000.00 15000.00 15000.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 0.14 5000.00 6827.38 5357.14 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 0.90 3000.00 7758.33 1375.00 NHPP0761-230 I-76 AND COUNTY ROAD 22 AT FO 06/14/18 0.01 1000.00 34000.00 25000.00 ER055A-001 PR SH 55 FLOOD REPAIR 2015 06/28/18 9.00 2250.00 5206.66 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 34.54 2836.71 4039.71 2230.42 FBR060A-022 SH 60 over the South Platte 07/12/18 11.00 2200.00 2428.90 2100.00 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 0.30 5000.00 8567.17 10740.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 0.90 1500.00 1445.83 625.00 SHE0701-245 I-70 MEDIAN CABLE RAIL INSTAL 07/12/18 0.33 4000.00 5500.00 5500.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 1.50 2500.00 4228.33 2395.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 2.60 4000.00 5357.80 973.40 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 24.00 2464.29 2464.29 2464.29 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 1.50 4500.00 6190.38 6080.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 6.70 4150.00 3645.94 4800.00 STA052A-040 SH 52: Antelope Creek 08/23/18 0.40 4000.00 3121.67 3600.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 1.00 3000.00 6760.23 4000.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 1.30 3035.00 3216.77 3100.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 5.05 2700.00 2820.45 3000.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 0.02 15000.00 27959.00 10000.00 STMR200-246 R2–2018 CRITICAL CULVERTS REP 09/20/18 0.48 3500.00 600.00 600.00 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 0.10 2000.00 14667.50 20000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 57.18 2808.30 3053.71 2839.35 BR1131-006 SH 113 AT MP 11.5 10/11/18 3.00 2500.00 2904.65 3100.00 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 0.05 10000.00 20371.00 13344.00 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 0.50 4000.00 5781.76 5785.92 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 19.60 3100.00 3927.47 3872.42 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 2.84 2700.00 2132.92 2450.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 0.50 3000.00 7205.71 9840.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 2.60 2800.00 5281.05 5435.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 117.50 2175.00 2538.17 2572.50 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 1.00 5000.00 6803.15 6606.30 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 1.00 4000.00 4437.33 1000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 175 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00032 Soil Conditioning Acre =================================================== ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 15.00 3250.00 3158.96 3000.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 0.50 5000.00 1476.67 800.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 1.60 2500.00 2995.00 2891.00 ER052A-039 SH 170 11/15/18 0.25 3000.00 6266.13 6360.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 4.70 1575.00 1607.14 1607.14 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 0.10 10000.00 16692.85 17821.40 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 0.10 1200.00 9700.00 10000.00 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 0.36 2100.00 3680.00 5860.00 C R500-198 R5 GUARDRAIL REPLACEMENT/UPGR 11/29/18 0.04 15000.00 16961.65 15623.30 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 1.92 3000.00 4695.92 7169.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 0.17 5000.00 7165.10 5400.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 63.00 2500.00 3058.75 2200.00 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 0.50 8000.00 3792.63 3000.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 0.60 2500.00 4283.64 4614.55 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 0.90 1500.00 4197.67 3838.00 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 2.00 2500.00 3200.00 2800.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 63.00 3053.57 3053.57 3053.57 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 303.33 2591.18 3004.79 2796.66 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 447.59 2703.06 3033.91 2786.39 =============== 212-00040 Soil Preparation (Lawn) Acre =================================================== NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 0.45 5000.00 6209.17 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 0.45 5000.00 6209.17 3000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 0.45 5000.00 6209.17 3000.00 =============== 212-00048 Soil Preparation (Spec) Cubic Yard ============================================= IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 56.00 2000.00 99.11 53.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 56.00 2000.00 99.11 53.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 56.00 2000.00 99.11 53.00 =============== 212-00050 Sod Sq Foot ================================================ SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 192.00 5.00 4.67 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 192.00 5.00 4.67 4.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 176 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00050 Sod Sq Foot ================================================ NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 1,695.00 10.00 3.00 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,695.00 10.00 3.00 3.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 19,740.00 1.63 1.66 1.66 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 2,775.00 2.50 5.09 10.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 30,000.00 1.00 0.82 0.71 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 52,515.00 1.32 1.32 1.56 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 54,402.00 1.60 1.35 1.61 =============== 212-00100 Tree Retention and Protection LUMP SUM =============================================== FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 1.00 2500.00 3180.74 2700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 2500.00 3180.74 2700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2500.00 3180.74 2700.00 =============== 212-00700 Organic Fertilizer - (Pilot Prog ONLY) Pound ================================================== ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 12,097.00 1.25 0.33 0.30 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12,097.00 1.25 0.33 0.30 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 1,750.00 2.00 0.80 1.06 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,750.00 2.00 0.80 1.06 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13,847.00 1.34 0.37 0.40 =============== 212-00701 Compost (Mech App) - (Pilot Prog ONLY) Cubic Yard ============================================= FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 346.00 30.00 41.05 35.37 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 177 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00701 Compost (Mech App) - (Pilot Prog ONLY) Cubic Yard ============================================= FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 455.00 5.00 39.11 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 801.00 15.80 40.28 35.16 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 801.00 15.80 40.28 35.16 =============== 212-00702 Bio Soil Amd (Hyd App) -(Pilot Prog ONLY Pound ================================================== ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 94,604.00 0.70 0.78 0.85 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 94,604.00 0.70 0.78 0.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 94,604.00 0.70 0.78 0.85 =============== 212-00703 Humate - (Pilot Prog ONLY) Pound ================================================== ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 6,724.00 1.25 0.33 0.27 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6,724.00 1.25 0.33 0.27 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 1,062.00 20.00 1.10 1.12 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 1,400.00 2.00 0.63 0.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,462.00 9.76 0.91 0.99 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,186.00 3.53 0.48 0.46 =============== 212-00704 Mycorrhizae - (Pilot Program ONLY) Pound ================================================== ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 280.00 10.00 10.44 10.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 280.00 10.00 10.44 10.00 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 118.00 5.00 16.28 12.34 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 178 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00704 Mycorrhizae - (Pilot Program ONLY) Pound ================================================== FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 145.00 2.00 9.93 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 263.00 3.35 13.87 12.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 543.00 6.78 12.01 11.04 =============== 212-00705 Elemental Sulfur - (Pilot Program ONLY) Pound ================================================== FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 2,985.00 2.00 0.63 0.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,985.00 2.00 0.63 0.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,985.00 2.00 0.63 0.80 =============== 212-00706 Seed (Native) Drill - (Pilot Prog ONLY) Acre =================================================== FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 4.93 800.00 744.86 642.48 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 6.86 730.00 1083.18 957.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 11.79 759.27 883.67 825.48 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.79 759.27 883.67 825.48 =============== 212-00707 Seed (Native) Hyd - (Pilot Prog ONLY) Acre =================================================== ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 27.80 900.00 1086.84 523.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 27.80 900.00 1086.84 523.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 27.80 900.00 1086.84 523.00 =============== 212-00708 Seed (Native) Brdcst - (Pilot Prog ONLY) Acre =================================================== FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 0.56 800.00 1377.31 1289.24 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 0.14 730.00 1536.00 970.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 0.70 786.00 1394.94 1225.39 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 0.70 786.00 1394.94 1225.39 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 179 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-01200 Landscape Restoration LUMP SUM =============================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 1.00 1000.00 4750.00 6000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1000.00 4750.00 6000.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 1.00 1500.00 9723.33 12500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1500.00 9723.33 12500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1250.00 8480.00 9250.00 =============== 213-00002 Mulching (Weed Free Hay) Acre =================================================== STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 0.80 2000.00 5037.50 15000.00 NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 1.00 1500.00 5150.00 1800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.80 1722.22 5091.93 7666.67 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 1.70 900.00 737.13 890.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.70 900.00 737.13 890.00 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 0.30 2000.00 5137.50 3945.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 1.50 2300.00 2988.33 1740.00 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 1.50 2695.00 3141.44 3750.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 6.70 800.00 884.82 975.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 1.00 700.00 2911.79 3500.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 1.30 5150.00 1041.66 850.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.30 1694.92 1397.32 1671.22 SHER200-243 R2 WRONG WAY PREVENTION 10/18/18 0.10 10000.00 1925.00 3500.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 19.40 605.00 1019.58 658.73 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 180 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00002 Mulching (Weed Free Hay) Acre =================================================== STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 0.10 1400.00 8610.00 7000.00 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 0.36 2100.00 6345.00 10690.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 53.00 600.00 784.61 700.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 0.60 2000.00 2166.71 2691.82 MPR200-252 REGION 2 - PUEBLO COUNTY HIGH 12/20/18 0.25 10000.00 2533.33 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 73.81 665.67 880.87 767.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 89.61 832.61 1073.32 1032.66 =============== 213-00003 Mulching (Weed Free) Acre =================================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 0.10 2000.00 5805.23 4610.46 STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 0.10 10000.00 6000.00 4000.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 4.00 900.00 687.40 500.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 3.10 1750.00 836.69 500.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 2.25 1240.00 607.24 460.22 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 1.60 1000.00 1061.91 1200.00 ER144A-002 SH 144 East and West of Goodr 03/08/18 17.00 900.00 650.12 525.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 1.00 800.00 1142.37 525.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 0.24 2500.00 3617.50 3750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 29.39 1065.50 703.59 602.81 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 0.30 2000.00 2683.30 1875.00 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 0.74 2500.00 2925.00 750.00 STA052A-040 SH 52: Antelope Creek 08/23/18 0.40 3000.00 1698.33 1800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.44 2534.72 2347.81 1276.04 BR1131-006 SH 113 AT MP 11.5 10/11/18 3.00 700.00 801.65 666.00 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 0.05 4500.00 16850.00 5560.00 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 2.84 1800.00 1088.34 680.00 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 15.00 1100.00 783.20 800.00 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 0.10 10000.00 13692.38 14659.53 C R500-198 R5 GUARDRAIL REPLACEMENT/UPGR 11/29/18 0.04 10000.00 4384.05 4038.10 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 1.12 1500.00 2433.35 3591.00 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 0.90 1500.00 2559.33 3928.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 23.05 1230.67 1054.25 1101.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 53.88 1175.43 845.36 834.18 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 181 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00004 Mulching (Weed Free Straw) Acre =================================================== ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 4.30 650.00 903.96 840.00 ER1151-033 PR SH 115-MP 34.7 01/25/18 0.40 692.50 1095.74 1170.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 1.10 900.00 1242.68 879.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 0.50 1500.00 1921.03 1842.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.30 763.81 983.09 947.29 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 4.93 800.00 713.76 622.27 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 14.00 300.00 692.50 445.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 0.85 5000.00 1556.19 1424.50 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 0.06 10000.00 7000.00 7000.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 0.14 3000.00 5107.14 6696.43 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 19.98 671.37 800.73 593.90 FBR060A-022 SH 60 over the South Platte 07/12/18 22.00 500.00 787.90 724.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 24.00 542.15 542.15 542.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 46.00 521.99 767.42 629.12 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 1.00 2500.00 1691.20 1382.40 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 1.00 800.00 2076.00 1800.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 1.20 900.00 729.00 737.50 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 0.50 3000.00 1165.62 1000.00 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 1.80 850.00 1307.14 1700.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 50.00 616.07 616.07 616.07 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 55.50 688.53 833.93 692.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 127.78 629.61 806.54 666.81 =============== 213-00005 Mulching (Decorative) Cubic Foot ============================================= FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 482.00 5.50 10.06 14.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 482.00 5.50 10.06 14.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 482.00 5.50 10.06 14.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 182 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00007 Mulching (Wood Strand) Acre =================================================== CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 0.65 22818.46 10190.00 10190.00 C0703-440 AVALANCHE CONTROL SYSTEM: EJM 02/01/18 0.50 5000.00 36463.39 1600.00 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 0.50 12957.52 10185.00 10185.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.65 14430.76 26870.72 7585.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.65 14430.76 26870.72 7585.45 =============== 213-00008 Mulching (Wood Chip) Cubic Foot ============================================= NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 4,238.00 3.00 2.73 2.70 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 6.00 100.00 40.00 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4,244.00 3.14 2.75 2.75 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 900.00 5.00 8.55 9.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 34.00 6.00 95.92 13.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1,812.00 4.47 3.16 3.16 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 3,715.00 3.00 4.30 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6,461.00 3.71 5.97 4.51 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10,705.00 3.48 4.77 3.81 =============== 213-00011 Mulching (Hydraulic) Acre =================================================== NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 3.76 900.00 1683.33 1250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.76 900.00 1683.33 1250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.76 900.00 1683.33 1250.00 =============== 213-00012 Spray-on Mulch Blanket Acre =================================================== SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 0.30 5000.00 3833.33 4200.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 0.50 4000.00 6476.28 6300.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 1.05 4000.00 4225.00 5200.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 183 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00012 Spray-on Mulch Blanket Acre =================================================== MTCER100-296 MTCE R1 FY18 WEST SIGN REPLAC 01/11/18 0.10 5000.00 4505.00 100.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 0.20 5560.00 5821.39 4000.00 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 1.40 5000.00 3741.55 3250.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 1.40 5000.00 4237.98 4231.36 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 3.70 2000.00 3299.16 2975.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 27.40 2500.00 2969.96 2580.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 3.00 3500.00 2838.26 2500.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 0.10 2500.00 6757.30 10500.00 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 3.50 5904.69 4950.00 4950.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 42.65 3062.80 3124.40 3018.25 STAR400-347 Various intersections across 04/12/18 0.20 5000.00 17096.00 500.00 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 14.00 3500.00 3226.67 3000.00 ER055A-001 PR SH 55 FLOOD REPAIR 2015 06/28/18 9.00 2750.00 3350.41 2580.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 23.20 3221.98 3347.96 2815.52 FBR060A-022 SH 60 over the South Platte 07/12/18 4.00 2850.00 2953.63 2600.00 SHE0701-245 I-70 MEDIAN CABLE RAIL INSTAL 07/12/18 0.33 5000.00 6000.00 6000.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 2.60 4000.00 5631.67 3895.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 5.05 1.70 3250.70 2650.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 0.02 25000.00 25648.00 10000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.00 1996.55 3313.44 3007.46 BR1131-006 SH 113 AT MP 11.5 10/11/18 0.80 4000.00 4546.40 3100.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 0.20 3075.00 6877.14 2280.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 2.60 3800.00 5357.42 5880.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 117.50 3200.00 2759.33 2604.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 0.50 4900.00 7016.67 6500.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 1.00 3500.00 3690.88 3304.00 ER052A-039 SH 170 11/15/18 0.21 6000.00 6718.97 4900.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 3.90 1785.00 1821.42 1821.42 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 0.92 4000.00 5040.42 8828.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 7.00 3200.00 3915.01 3100.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 0.19 4000.00 4859.36 4584.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 134.82 3194.68 3034.34 2741.24 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 212.67 3103.60 3145.27 2819.92 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 184 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00013 Spray-on Mulch Blanket Pound ================================================== STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 3,000.00 2.50 2.33 3.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,000.00 2.50 2.33 3.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,000.00 2.50 2.33 3.35 =============== 213-00061 Mulch Tackifier Pound ================================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 10.00 60.00 44.11 38.22 STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 160.00 5.00 14.43 20.00 STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 200.00 6.00 7.55 6.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 800.00 2.80 2.31 1.90 STA0342-060 US 34D OVERLAY AND BRIDGE WOR ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 427.00 4.00 3.06 2.50 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 620.00 10.00 2.83 2.30 ER1151-033 PR SH 115-MP 34.7 01/25/18 6.00 6.00 6.03 6.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 450.00 3.00 2.01 1.75 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 160.00 7.00 4.35 4.00 ER144A-002 SH 144 East and West of Goodr 03/08/18 3,400.00 3.00 2.22 2.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 100.00 2.50 4.98 7.75 NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 10.00 15.00 186.67 5.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 50.00 5.00 8.52 7.03 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 48.00 4.00 4.63 4.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6,441.00 4.08 2.72 2.87 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 2,465.00 3.00 2.38 2.18 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 1,390.00 3.00 2.25 2.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 85.00 10.00 8.49 8.24 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 188.00 2.50 2.91 2.50 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 30.00 25.00 12.00 12.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 28.00 3.00 14.42 18.75 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 900.00 5.00 9.83 7.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,086.00 3.58 3.19 3.33 FBR060A-022 SH 60 over the South Platte 07/12/18 4,400.00 2.70 2.31 2.15 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 185 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00061 Mulch Tackifier Pound ================================================== NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 30.00 20.00 13.44 16.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 60.00 5.00 6.17 6.25 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 300.00 3.00 3.94 3.40 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 4,800.00 2.11 2.11 2.11 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 260.00 6.60 11.08 6.00 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 150.00 3.50 9.50 3.50 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 1,340.00 2.60 2.67 2.25 STA052A-040 SH 52: Antelope Creek 08/23/18 80.00 10.00 4.28 4.20 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 20.00 3.00 40.50 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 11,440.00 2.66 2.65 2.36 BR1131-006 SH 113 AT MP 11.5 10/11/18 720.00 3.00 2.83 2.67 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 20.00 10.00 69.50 17.00 SHER200-243 R2 WRONG WAY PREVENTION 10/18/18 20.00 7.50 30.00 50.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 3,900.00 3.00 2.52 2.61 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 570.00 3.50 14.94 2.75 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 100.00 10.00 5.91 5.82 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 200.00 4.00 14.12 4.85 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 4,500.00 3.00 2.86 3.20 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 240.00 4.00 3.20 2.83 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 10.00 50.00 43.52 45.99 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 10.00 2.60 226.00 500.00 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 36.00 4.00 13.50 22.75 C R500-198 R5 GUARDRAIL REPLACEMENT/UPGR 11/29/18 8.00 15.00 55.18 50.35 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 112.00 5.00 22.44 27.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 50,000.00 2.50 2.64 2.40 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 100.00 10.00 4.29 3.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 120.00 10.00 5.44 4.91 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 180.00 2.50 3.61 6.00 MPR200-252 REGION 2 - PUEBLO COUNTY HIGH 12/20/18 50.00 25.00 19.33 25.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 17,400.00 2.14 2.14 2.14 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 78,296.00 2.55 2.95 2.58 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 101,263.00 2.71 2.89 2.61 =============== 213-00067 Rock Mulch (Weed Free) Sq Foot ================================================ SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 8,777.00 1.90 1.38 1.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8,777.00 1.90 1.38 1.25 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 2,020.00 2.50 6.21 3.03 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,020.00 2.50 6.21 3.03 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 186 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00067 Rock Mulch (Weed Free) Sq Foot ================================================ NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 171.00 15.00 10.00 10.00 C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 150.00 15.00 8.50 5.00 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 105.00 15.00 30.00 75.00 STM0252-469 R2 ADA RAMPS I-25 INT S NEV- 09/06/18 66.00 8.00 13.50 15.00 NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 590.00 15.00 15.00 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,082.00 14.57 15.70 18.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,879.00 3.16 3.04 3.14 =============== 213-00070 Landscape Weed Barr Fabric Sq Yard ================================================ STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 295.00 5.00 3.15 2.96 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 295.00 5.00 3.15 2.96 C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 19.00 10.00 19.00 26.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 19.00 10.00 19.00 26.00 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 484.00 3.00 5.45 2.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 610.00 3.68 3.75 3.75 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 135.00 9.00 15.80 50.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 884.00 3.00 2.18 1.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,113.00 3.58 4.67 5.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,427.00 3.80 4.64 5.27 =============== 213-00150 Bonded Fiber Matrix Acre =================================================== NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 0.06 15000.00 6675.00 5200.00 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 1.00 2800.00 4996.00 5900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.06 3490.57 5060.58 5860.38 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 187 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00150 Bonded Fiber Matrix Acre =================================================== FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 9.75 3200.00 2883.80 2818.84 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 28.00 250.00 2302.89 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 37.75 1011.92 2541.37 2953.21 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 34.00 2775.00 2775.00 2775.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 34.00 2775.00 2775.00 2775.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 100.20 2600.00 2592.67 2604.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.60 3150.00 3214.29 3214.29 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 7.00 3000.00 3829.79 3100.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 28.00 2839.28 2839.28 2839.28 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 136.80 2675.88 2711.42 2684.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 209.61 2396.40 2674.36 2763.75 =============== 213-00460 Landscape Border (3/16x4 In) Lin Foot =============================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 100.00 6.83 6.96 6.96 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 215.00 6.40 11.00 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 315.00 6.54 10.66 10.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 315.00 6.54 10.66 10.40 =============== 213-00462 Landscape Border (3/16x5-1/2 In) Lin Foot =============================================== FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 525.00 6.00 11.50 10.50 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 1,620.00 4.50 7.98 6.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,145.00 4.87 8.99 7.18 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,145.00 4.87 8.99 7.18 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 188 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00470 Landscape Border (1/4x5 In) Lin Foot =============================================== STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 240.00 10.00 6.29 5.63 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 240.00 10.00 6.29 5.63 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 240.00 10.00 6.29 5.63 =============== 213-00700 Landscape Boulder Each =================================================== FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 4.00 350.00 611.54 555.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 27.00 299.25 305.36 305.36 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 31.00 305.80 435.65 337.57 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 31.00 305.80 435.65 337.57 =============== 213-00705 Landscape Boulder (Special) Each =================================================== ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 401.00 200.00 396.06 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 401.00 200.00 396.06 250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 401.00 200.00 396.06 250.00 =============== 214-00000 Landscape Maintenance LUMP SUM =============================================== NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 1.00 20000.00 12375.00 7500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 20000.00 12375.00 7500.00 ER055A-001 PR SH 55 FLOOD REPAIR 2015 06/28/18 1.00 15000.00 26831.75 9500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 15000.00 26831.75 9500.00 FBR060A-022 SH 60 over the South Platte 07/12/18 1.00 14000.00 19494.12 12500.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 189 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 214-00000 Landscape Maintenance LUMP SUM =============================================== STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 1.00 3000.00 17204.87 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 8500.00 18921.80 7750.00 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 1.00 12500.00 18222.37 24000.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 15750.00 16071.43 16071.43 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 1.00 40000.00 88436.55 91000.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 1.00 6500.00 16149.18 26249.71 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 18687.50 37537.58 39330.29 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 15843.75 26064.99 23727.64 =============== 214-00003 Landscape Maintenance (2020) LUMP SUM =============================================== C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 1.00 31607.14 31607.14 31607.14 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 31607.14 31607.14 31607.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 31607.14 31607.14 31607.14 =============== 214-00005 Landscape Maintenance (24 Month) LUMP SUM =============================================== NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 1.00 40000.00 40000.00 30000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 40000.00 40000.00 30000.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 30000.00 30000.00 30000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 30000.00 30000.00 30000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 35000.00 37500.00 30000.00 =============== 214-00155 Plant (B and B) Each =================================================== FBR060A-022 SH 60 over the South Platte 07/12/18 45.00 40.00 516.35 485.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 45.00 40.00 516.35 485.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 45.00 40.00 516.35 485.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 190 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 214-00205 Deciduous Tree (5 Gal) Each =================================================== NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 21.00 47.00 83.33 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 21.00 47.00 83.33 40.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21.00 47.00 83.33 40.00 =============== 214-00210 Deciduous Tree (1 In C) Each =================================================== ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 20.00 200.00 384.90 380.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 200.00 384.90 380.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 200.00 384.90 380.00 =============== 214-00220 Deciduous Tree (2 In C) Each =================================================== NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 4.00 1000.00 660.33 500.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 13.00 299.25 305.36 305.36 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 3.00 530.00 903.20 750.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 26.00 310.00 639.80 702.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 46.00 381.31 640.41 575.47 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 46.00 381.31 640.41 575.47 =============== 214-00222 Decid Tree (2 In Cal) (Furnish) Each =================================================== NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 1.00 500.00 979.93 600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 500.00 979.93 600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 500.00 979.93 600.00 =============== 214-00225 Deciduous Tree (2.5 In C) Each =================================================== FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 1.00 525.00 998.88 700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 525.00 998.88 700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 525.00 998.88 700.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 191 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 214-00301 Deciduous Shrub (Tubeling) Each =================================================== ER055A-001 PR SH 55 FLOOD REPAIR 2015 06/28/18 1,936.00 9.00 9.16 3.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,936.00 9.00 9.16 3.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,936.00 9.00 9.16 3.25 =============== 214-00310 Deciduous Shrub (1 Gal) Each =================================================== NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 1,794.00 28.00 17.67 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,794.00 28.00 17.67 18.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,794.00 28.00 17.67 18.00 =============== 214-00350 Deciduous Shrub (5 Gal) Each =================================================== NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 36.00 50.00 126.50 56.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 36.00 50.00 126.50 56.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 60.00 65.00 83.04 99.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 4.00 200.00 160.00 160.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 64.00 73.44 83.88 102.81 FBR060A-022 SH 60 over the South Platte 07/12/18 270.00 28.00 43.16 36.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 270.00 28.00 43.16 36.00 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 118.00 45.00 179.47 50.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 134.00 55.00 58.41 58.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 252.00 50.32 121.84 54.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 622.00 42.99 66.84 51.43 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 192 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 214-00504 Evergreen Tree (4 Ft)(B-B) Each =================================================== ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 12.00 600.00 535.15 550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12.00 600.00 535.15 550.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 600.00 535.15 550.00 =============== 214-00506 Evergreen Tree (6 Ft)(B-B) Each =================================================== NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 4.00 700.00 998.75 820.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 700.00 998.75 820.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 3.00 393.75 401.78 401.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 393.75 401.78 401.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 568.75 904.49 640.76 =============== 214-00508 Evergreen Tree (8 Ft)(B-B) Each =================================================== FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 2.00 800.00 1073.96 725.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 7.00 450.00 686.59 750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9.00 527.78 788.52 744.44 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 527.78 788.52 744.44 =============== 214-00650 Evergreen Shrub (5 Gal) Each =================================================== FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 21.00 45.00 51.53 51.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 21.00 45.00 51.53 51.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21.00 45.00 51.53 51.00 =============== 214-00910 Perennials (1 Gal) Each =================================================== FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 219.00 22.00 53.81 23.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 193 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 214-00910 Perennials (1 Gal) Each =================================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 531.00 15.96 16.29 16.29 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 750.00 17.72 41.56 18.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 750.00 17.72 41.56 18.25 =============== 214-01009 Brush Windrow Lin Foot =============================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 600.00 9.10 9.10 9.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 600.00 9.10 9.10 9.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 600.00 9.10 9.10 9.10 =============== 214-01010 Brush Layer Cutting Each =================================================== NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 1,200.00 6.00 15.45 9.55 ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 300.00 4.00 5.56 5.50 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 8,007.00 5.50 3.96 3.10 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9,507.00 5.52 4.79 3.99 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 600.00 10.00 4.48 5.72 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 600.00 10.00 4.48 5.72 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 100.00 3.00 18.27 6.25 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 55.00 10.00 12.32 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 155.00 5.48 15.51 11.13 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 80.00 7.00 6.11 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 80.00 7.00 6.11 6.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10,342.00 5.79 4.96 4.21 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 194 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 214-01011 Live Brush Mattress Lin Foot =============================================== NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 1,316.00 29.00 26.00 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,316.00 29.00 26.00 13.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 60.00 17.15 17.15 17.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 60.00 17.15 17.15 17.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,376.00 28.48 25.87 13.18 =============== 214-01012 Live Brush Fascine Lin Foot =============================================== NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 132.00 125.00 41.67 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 132.00 125.00 41.67 20.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 150.00 23.57 23.57 23.57 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 150.00 23.57 23.57 23.57 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 282.00 71.05 36.70 21.90 =============== 214-01013 Live Willow Stakes Each =================================================== NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 260.00 8.00 7.00 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 260.00 8.00 7.00 5.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 3,000.00 3.49 3.49 3.49 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,000.00 3.49 3.49 3.49 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,260.00 3.85 4.21 3.61 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 195 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 214-01014 Live Willow Brush Each =================================================== NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 7,716.00 4.00 6.60 3.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7,716.00 4.00 6.60 3.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,716.00 4.00 6.60 3.80 =============== 214-01015 Willow Cuttings Each =================================================== NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 435.00 8.00 3.90 3.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 215.00 8.00 6.77 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 650.00 8.00 4.61 3.99 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 650.00 8.00 4.61 3.99 =============== 214-01227 Rootwad Each =================================================== NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 2.00 8000.00 3251.67 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 8000.00 3251.67 350.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 8000.00 3251.67 350.00 =============== 214-01228 Riprap Planting Pocket Each =================================================== NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 49.00 300.00 246.67 330.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 49.00 300.00 246.67 330.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 183.00 32.14 32.14 32.14 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 183.00 32.14 32.14 32.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 232.00 88.71 127.70 95.05 =============== 214-01401 Nursery Stock Container (DRC #10) Each =================================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 4,000.00 3.49 3.49 3.49 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,000.00 3.49 3.49 3.49 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,000.00 3.49 3.49 3.49 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 196 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 214-01403 Nursery Stock Container (DRC # 60) Each =================================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 150.00 6.96 6.96 6.96 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 150.00 6.96 6.96 6.96 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 150.00 6.96 6.96 6.96 =============== 214-01404 Nursery Stock Container (DRC # 180) Each =================================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 30.00 32.14 32.14 32.14 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 30.00 32.14 32.14 32.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 32.14 32.14 32.14 =============== 215-00000 Transplant Shrub Each =================================================== FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 15.00 100.00 102.28 82.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 15.00 100.00 102.28 82.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15.00 100.00 102.28 82.50 =============== 215-00030 Transplant Tree (1.5-3 In) Each =================================================== NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 4.00 1000.00 668.33 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 1000.00 668.33 250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 1000.00 668.33 250.00 =============== 216-00021 Soil Reten Blanket (Cl 1) Sq Yard ================================================ STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 360.00 6.00 4.80 3.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 360.00 6.00 4.80 3.50 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 735.00 5.00 8.99 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 735.00 5.00 8.99 15.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 197 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 216-00021 Soil Reten Blanket (Cl 1) Sq Yard ================================================ NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 169,636.00 2.04 2.04 2.04 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 169,636.00 2.04 2.04 2.04 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 170,731.00 2.06 2.39 2.10 =============== 216-00037 Soil Reten Blanket (Coconut) Sq Yard ================================================ ER055A-001 PR SH 55 FLOOD REPAIR 2015 06/28/18 166.00 5.00 4.95 4.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 166.00 5.00 4.95 4.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 166.00 5.00 4.95 4.50 =============== 216-00041 Soil Reten Blanket (S/C) Sq Yard ================================================ STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 450.00 3.00 3.42 3.50 ER1151-033 PR SH 115-MP 34.7 01/25/18 1,630.00 5.00 2.11 2.30 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,080.00 4.57 2.50 2.56 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 1,200.00 4.00 5.89 5.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,200.00 4.00 5.89 5.75 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 300.00 3.50 13.42 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 300.00 3.50 13.42 4.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,580.00 4.29 4.37 3.75 =============== 216-00042 Soil Retent Blanket (BioD S/C) Sq Yard ================================================ ER144A-002 SH 144 East and West of Goodr 03/08/18 363.00 3.50 2.92 3.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 363.00 3.50 2.92 3.20 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 198 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 216-00042 Soil Retent Blanket (BioD S/C) Sq Yard ================================================ ER055A-001 PR SH 55 FLOOD REPAIR 2015 06/28/18 100.00 10.00 4.38 3.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 100.00 10.00 4.38 3.25 BR1131-006 SH 113 AT MP 11.5 10/11/18 4,500.00 3.00 3.02 3.33 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 1,220.00 3.50 2.79 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5,720.00 3.11 2.98 3.26 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,183.00 3.24 3.01 3.26 =============== 216-00066 Concrete Block SRS Sq Yard ================================================ STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 70.00 95.00 129.77 130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 70.00 95.00 129.77 130.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 70.00 95.00 129.77 130.00 =============== 216-00070 Geocell Confinement Sys Sq Yard ================================================ NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 56.00 52.50 52.50 52.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 56.00 52.50 52.50 52.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 56.00 52.50 52.50 52.50 =============== 216-00101 Soil Reten Blanket (S-C)(PhotoD Cl 1) Sq Yard ================================================ STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 1,579.00 4.00 3.67 3.33 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,579.00 4.00 3.67 3.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,579.00 4.00 3.67 3.33 =============== 216-00201 Soil Reten Blanket (S-C)(BioD Cl 1) Sq Yard ================================================ NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 1,155.00 3.00 5.00 4.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 199 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 216-00201 Soil Reten Blanket (S-C)(BioD Cl 1) Sq Yard ================================================ ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 5,460.00 2.75 2.98 2.90 STA0342-060 US 34D OVERLAY AND BRIDGE WOR ER1151-033 PR SH 115-MP 34.7 01/25/18 290.00 2.00 2.36 2.30 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 1,450.00 6.00 3.60 4.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 47,869.00 2.00 2.44 1.75 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 250.00 20.00 3.81 3.75 NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 50.00 35.00 14.13 10.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 381.00 5.00 3.88 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 56,905.00 2.32 2.53 2.01 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 3,211.00 2.75 2.56 2.45 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 16,000.00 4.00 1.90 2.15 STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 315.00 4.00 7.48 11.00 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 1,586.00 3.00 3.55 2.50 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 135.00 2.50 4.39 4.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 200.00 3.00 5.58 5.00 NHPP0761-230 I-76 AND COUNTY ROAD 22 AT FO 06/14/18 100.00 4.00 7.14 6.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 21,547.00 3.72 2.28 2.41 FBR060A-022 SH 60 over the South Platte 07/12/18 9,000.00 2.00 2.30 2.35 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 43,100.00 1.94 1.94 1.94 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 200.00 5.50 11.28 7.50 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 1,000.00 4.00 3.15 3.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 1,100.00 3.00 3.66 4.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 400.00 2.50 3.65 3.75 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 17,000.00 2.50 2.33 2.00 STMR200-246 R2–2018 CRITICAL CULVERTS REP 09/20/18 2,339.00 3.50 3.00 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 74,139.00 2.18 2.35 2.11 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 2,420.00 2.75 3.44 3.16 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 1,022.00 3.50 3.72 3.50 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 233.00 4.00 37.27 4.10 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 2,420.00 3.00 3.62 2.15 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 200 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 216-00201 Soil Reten Blanket (S-C)(BioD Cl 1) Sq Yard ================================================ NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 8,200.00 2.80 2.66 2.52 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 270.00 7.00 3.60 3.19 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 1,710.00 4.00 3.53 3.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 2,100.00 3.00 3.13 3.54 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 7,500.00 2.00 2.04 2.04 STA086A-051 SH 86; WEST OF I-70 11/29/18 850.00 3.00 3.51 2.35 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 50,890.00 3.00 3.60 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 77,615.00 2.92 3.58 2.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 230,206.00 2.61 2.71 2.36 =============== 216-00211 Soil Reten Blanket (Exc)(BioD Cl 1) Sq Yard ================================================ NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 50.00 8.00 21.25 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 50.00 8.00 21.25 21.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 8.00 21.25 21.00 =============== 216-00221 Soil Reten Blanket (C)(BioD Cl 1) Sq Yard ================================================ NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 3,630.00 4.00 3.07 2.60 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 2,000.00 3.50 3.56 4.08 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,630.00 3.82 3.36 3.13 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,630.00 3.82 3.36 3.13 =============== 216-00222 Soil Reten Blanket (C)(BioD Cl 2) Sq Yard ================================================ ER052A-039 SH 170 11/15/18 200.00 5.00 5.15 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 200.00 5.00 5.15 6.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 200.00 5.00 5.15 6.00 =============== 216-00301 Turf Reinf Mat (Cl 1) Sq Yard ================================================ ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 259.00 6.50 6.54 5.75 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 201 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 216-00301 Turf Reinf Mat (Cl 1) Sq Yard ================================================ STA0342-060 US 34D OVERLAY AND BRIDGE WOR -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 259.00 6.50 6.54 5.75 FBR060A-022 SH 60 over the South Platte 07/12/18 600.00 5.00 4.86 5.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 600.00 5.00 4.86 5.25 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 250.00 15.00 6.03 6.25 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 7,006.00 6.50 8.07 6.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 11,700.00 4.04 4.04 4.04 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 18,956.00 5.09 6.87 4.79 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19,815.00 5.11 6.56 4.82 =============== 216-00302 Turf Reinf Mat (Cl 2) Sq Yard ================================================ C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 10,860.00 4.87 4.87 4.87 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10,860.00 4.87 4.87 4.87 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 5,040.00 4.84 4.84 4.84 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5,040.00 4.84 4.84 4.84 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15,900.00 4.86 4.86 4.86 =============== 216-00303 Turf Reinf Mat (Cl 3) Sq Yard ================================================ ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 250.00 14.00 15.46 9.00 ER144A-002 SH 144 East and West of Goodr 03/08/18 21,531.00 5.50 5.01 4.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 21,781.00 5.60 5.13 4.55 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 60.00 65.00 39.98 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 60.00 65.00 39.98 20.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 202 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 216-00303 Turf Reinf Mat (Cl 3) Sq Yard ================================================ ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 1,220.00 10.00 6.04 5.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 8,480.00 5.86 5.86 5.86 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9,700.00 6.38 5.95 5.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 31,541.00 5.95 5.23 4.95 =============== 217-00000 Herbicide Treatment Sq Yard ================================================ ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 60.00 164.02 125.00 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 60.00 164.02 125.00 125.00 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 3,100.00 3.00 0.45 0.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,100.00 3.00 0.45 0.30 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 5.00 125.00 145.25 225.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 125.00 145.25 225.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 80.00 0.50 11.35 10.50 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 100.00 3.00 2.79 0.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 180.00 1.89 5.24 5.08 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,345.00 6.01 2.47 3.13 =============== 217-00020 Herbicide Treatment Hour =================================================== ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 4.00 138.90 231.40 250.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 203 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 217-00020 Herbicide Treatment Hour =================================================== STA0342-060 US 34D OVERLAY AND BRIDGE WOR CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 12.00 168.43 130.00 130.00 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 32.00 130.00 162.33 130.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 16.00 130.00 147.13 129.61 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 16.00 130.00 110.49 95.00 NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 5.00 150.00 223.33 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 85.00 137.02 152.45 133.10 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 10.00 2.00 134.37 132.97 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 40.00 100.00 113.67 120.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 8.00 130.00 144.17 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 58.00 87.24 125.15 122.93 FBR060A-022 SH 60 over the South Platte 07/12/18 40.00 110.00 233.73 95.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 160.00 267.86 267.86 267.86 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 12.00 303.00 263.22 185.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 15.00 125.00 121.68 150.00 STMR200-246 R2–2018 CRITICAL CULVERTS REP 09/20/18 40.00 85.00 80.00 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 267.00 210.37 213.84 203.47 BR1131-006 SH 113 AT MP 11.5 10/11/18 20.00 110.00 217.80 277.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 10.00 100.00 232.81 206.50 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 150.00 110.00 145.24 165.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 100.00 198.22 198.22 198.22 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 280.00 141.15 172.60 186.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 690.00 162.89 179.44 181.08 =============== 218-00000 Noxious Weed Management LUMP SUM =============================================== ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 1.00 23390.18 28655.00 28655.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 23390.18 28655.00 28655.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 204 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 218-00000 Noxious Weed Management LUMP SUM =============================================== FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 1.00 5000.00 1824.97 904.16 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 5000.00 1824.97 904.16 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 14195.09 4264.07 14779.58 =============== 240-00000 Wildlife Biologist Hour =================================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 40.00 100.00 197.25 200.00 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 96.00 115.00 123.12 125.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 96.00 115.00 115.84 114.36 C0703-440 AVALANCHE CONTROL SYSTEM: EJM 02/01/18 40.00 125.00 152.52 121.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 96.00 115.00 120.28 112.00 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 20.00 100.00 108.25 95.00 NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 20.00 200.00 140.67 109.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 408.00 117.94 125.38 124.15 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 80.00 120.00 141.67 120.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 20.00 150.00 154.44 107.64 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 20.00 116.00 111.63 109.58 MTCE R100-312 R1 CHIP SEAL 05/17/18 20.00 111.79 200.00 200.00 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 24.00 125.00 140.33 136.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 164.00 122.90 142.91 129.32 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 20.00 120.00 190.00 146.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 20.00 100.00 113.10 100.00 SHE0701-245 I-70 MEDIAN CABLE RAIL INSTAL 07/12/18 8.00 90.00 93.00 93.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 50.00 139.28 139.28 139.28 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 80.00 150.00 121.25 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 178.00 135.30 133.45 93.42 NHPP0702-366 I-70 Avon to Vail 11/08/18 10.00 110.00 158.76 130.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 205 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 240-00000 Wildlife Biologist Hour =================================================== NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 16.00 125.00 155.00 145.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 40.00 220.00 123.33 100.00 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 10.00 160.00 150.00 150.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 40.00 113.40 118.70 118.70 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 80.00 140.00 66.00 42.00 C R500-198 R5 GUARDRAIL REPLACEMENT/UPGR 11/29/18 30.00 200.00 142.50 135.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 15.00 100.00 85.13 75.38 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 150.00 90.00 104.75 35.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 60.00 100.00 92.52 88.00 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 15.00 100.00 108.93 100.00 STAR100-279 FY20 HMA PREVENTATIVE MAINTEN 12/13/18 80.00 120.00 117.50 100.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 50.00 111.43 111.43 111.43 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 596.00 122.33 107.32 80.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,346.00 122.78 121.69 101.41 =============== 240-00001 Wildlife Biologist Day ==================================================== STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 5.00 1000.00 835.64 800.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 3.00 1000.00 1050.00 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 1000.00 916.02 875.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 50.00 1000.00 134.62 83.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 50.00 1000.00 134.62 83.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 58.00 1000.00 272.01 192.97 =============== 240-00010 Rem of Nests Hour =================================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 40.00 100.00 142.25 90.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 10.00 125.00 89.26 100.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 8.00 150.00 320.00 225.00 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 24.00 115.00 95.37 136.46 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 10.00 95.00 124.11 120.35 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 24.00 115.00 85.12 89.12 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 24.00 115.00 123.03 87.50 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 10.00 120.00 120.04 109.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 206 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 240-00010 Rem of Nests Hour =================================================== ER144A-002 SH 144 East and West of Goodr 03/08/18 40.00 45.00 132.54 75.00 NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 8.00 120.00 93.33 50.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 5.00 120.00 125.00 130.00 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 80.00 125.00 206.97 105.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 283.00 106.86 137.40 101.52 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 8.00 120.00 265.30 125.00 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 40.00 85.00 93.96 31.63 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 80.00 120.00 110.33 200.00 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 10.00 100.00 111.10 160.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 40.00 120.00 87.91 49.50 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 20.00 105.00 102.35 109.58 MTCE R100-312 R1 CHIP SEAL 05/17/18 20.00 94.15 200.00 200.00 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 40.00 200.00 151.67 105.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 258.00 123.03 109.25 124.95 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 40.00 150.00 104.42 78.25 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 200.00 78.21 78.21 78.21 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 80.00 100.00 112.00 48.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 30.00 103.00 102.32 85.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 24.00 100.00 97.19 60.00 STMR200-246 R2–2018 CRITICAL CULVERTS REP 09/20/18 15.00 85.00 40.00 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 389.00 93.59 99.56 69.93 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 10.00 102.00 80.67 102.51 NHPP0702-366 I-70 Avon to Vail 11/08/18 10.00 110.00 113.76 130.00 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 16.00 105.00 127.00 126.00 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 5.00 150.00 180.43 125.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 40.00 150.00 134.00 101.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 100.00 98.70 98.95 98.95 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 80.00 120.00 121.50 143.00 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 50.00 100.00 94.14 37.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 60.00 150.00 85.04 82.00 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 16.00 100.00 133.33 80.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 200.00 78.21 78.21 78.21 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 587.00 104.36 106.03 92.05 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,517.00 105.24 113.94 93.74 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 207 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 240-00020 Netting Sq Yard ================================================ STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 15.00 30.00 25.07 7.00 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 2,570.00 7.50 10.03 7.03 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 1,000.00 10.00 12.89 15.59 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 820.00 7.50 11.89 10.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 2,500.00 7.50 10.63 11.00 ER144A-002 SH 144 East and West of Goodr 03/08/18 100.00 35.00 14.57 15.00 NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 9.00 33.00 30.27 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7,014.00 8.33 11.17 10.16 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 5,000.00 15.00 1.54 1.10 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 10,000.00 15.00 11.03 7.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 15,000.00 15.00 6.72 5.10 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 1,500.00 10.12 10.12 10.12 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 1,460.00 12.00 8.06 11.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 2,670.00 8.50 9.57 2.00 STMR200-246 R2–2018 CRITICAL CULVERTS REP 09/20/18 20.00 110.00 4.50 4.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5,650.00 10.19 8.77 6.49 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 214.00 11.00 10.82 10.25 NHPP0702-366 I-70 Avon to Vail 11/08/18 100.00 10.00 17.45 32.00 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 5.00 30.00 188.25 100.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 3,200.00 12.00 9.92 7.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 2,250.00 8.09 8.86 8.86 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 800.00 14.00 16.50 23.00 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 7,770.00 10.00 7.28 1.50 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 1,000.00 25.00 10.20 13.10 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 100.00 10.00 17.46 10.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1,500.00 10.12 10.12 10.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 16,939.00 11.23 8.75 6.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 44,603.00 11.91 8.67 6.55 =============== 240-00200 Bat House Each =================================================== FBR060A-022 SH 60 over the South Platte 07/12/18 2.00 250.00 804.20 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 250.00 804.20 1000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 208 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 240-00200 Bat House Each =================================================== BR1131-006 SH 113 AT MP 11.5 10/11/18 2.00 300.00 1544.35 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 300.00 1544.35 500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 275.00 1140.63 750.00 =============== 250-00010 Envir Health/Safety Mngmt LUMP SUM =============================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 1.00 3000.00 18112.03 24224.05 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 1.00 2500.00 4239.75 4625.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 1.00 2500.00 4769.32 3366.57 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 1.00 5700.00 4887.10 3880.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 1.00 2000.00 5067.27 6134.54 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 1.00 5000.00 5125.00 5300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 3450.00 5896.87 7921.69 NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPL 04/05/18 1.00 2000.00 3942.33 4520.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 1.00 7000.00 6000.00 6000.00 NHPP0703-436 EJMT PLENUM WATERPROOFING MEM 06/28/18 1.00 5000.00 24795.00 26000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 4666.67 11236.17 12173.33 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 1.00 10000.00 6469.67 6587.00 SHE0701-245 I-70 MEDIAN CABLE RAIL INSTAL 07/12/18 1.00 3000.00 5400.00 5400.00 NHPP070A-032 I-70B & Z GRAND JCT PHASE 1 A 09/20/18 1.00 10000.00 13995.00 12000.00 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 1.00 3000.00 4144.75 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 6500.00 6829.77 7246.75 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 3187.24 5527.20 5527.20 C R500-198 R5 GUARDRAIL REPLACEMENT/UPGR 11/29/18 1.00 10000.00 5942.50 6200.00 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 1.00 4000.00 7291.20 4000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 209 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 250-00010 Envir Health/Safety Mngmt LUMP SUM =============================================== IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 1.00 5000.00 4639.68 4600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 5546.81 6035.58 5081.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17.00 4875.72 6745.54 7844.96 =============== 250-00050 Monitoring Technician Hour =================================================== FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 10.00 85.00 181.04 234.40 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 200.00 85.00 98.93 97.26 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 500.00 85.00 97.07 89.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 8.00 110.00 282.41 264.82 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 8.00 100.00 72.00 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 726.00 85.44 99.43 95.06 NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPL 04/05/18 4.00 120.00 94.33 83.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 8.00 80.00 86.93 76.71 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 24.00 110.00 225.00 225.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 36.00 104.44 136.97 176.27 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 40.00 200.00 168.83 170.00 SHE0701-245 I-70 MEDIAN CABLE RAIL INSTAL 07/12/18 8.00 60.00 125.00 125.00 NHPP070A-032 I-70B & Z GRAND JCT PHASE 1 A 09/20/18 131.00 90.00 172.50 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 179.00 113.24 170.03 102.12 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 40.00 120.00 100.00 100.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 20.00 101.97 101.22 101.22 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 50.00 90.00 93.62 80.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 50.00 75.00 78.68 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 160.00 94.31 88.56 87.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,101.00 91.87 105.94 97.79 =============== 250-00100 Environmental Health and Safety LUMP SUM =============================================== STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 1.00 5200.00 4561.50 4250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 5200.00 4561.50 4250.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 210 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 250-00100 Environmental Health and Safety LUMP SUM =============================================== C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 1.00 10000.00 15000.00 15000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 10000.00 15000.00 15000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 7600.00 6649.20 9625.00 =============== 250-00110 Health and Safety Officer Hour =================================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 2.00 125.00 552.50 1000.00 CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 40.00 122.30 80.00 80.00 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 10.00 95.00 227.49 283.70 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 100.00 95.00 121.52 119.81 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 200.00 95.00 128.06 120.00 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 80.00 189.87 150.00 150.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 2.00 120.00 84.50 88.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 434.00 115.26 128.99 129.48 NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPL 04/05/18 2.00 250.00 106.00 95.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 4.00 100.00 108.54 87.66 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 8.00 150.00 175.00 175.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 14.00 150.00 125.75 138.62 SHE0701-245 I-70 MEDIAN CABLE RAIL INSTAL 07/12/18 8.00 120.00 135.00 135.00 NHPP070A-032 I-70B & Z GRAND JCT PHASE 1 A 09/20/18 40.00 105.00 172.50 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 48.00 107.50 169.09 147.50 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 8.00 160.00 100.00 100.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 20.00 100.17 115.08 115.08 C R500-198 R5 GUARDRAIL REPLACEMENT/UPGR 11/29/18 40.00 140.00 262.50 265.00 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 50.00 90.00 117.48 100.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 211 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 250-00110 Health and Safety Officer Hour =================================================== IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 50.00 100.00 92.91 91.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 168.00 109.43 129.13 138.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 664.00 113.95 130.37 133.23 =============== 250-00120 Material Sampling and Delivery Each =================================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 3.00 200.00 407.50 500.00 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 1.00 500.00 150.70 101.25 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 2.00 500.00 78.08 76.24 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 2.00 500.00 81.44 75.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 2.00 160.00 552.65 105.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 342.00 187.60 211.43 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 2.00 277.00 248.44 328.74 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 3.00 300.00 3000.00 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 290.80 998.86 1931.50 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 2.00 200.00 790.83 374.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 200.00 790.83 374.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 5.00 420.00 82.95 82.95 C R500-198 R5 GUARDRAIL REPLACEMENT/UPGR 11/29/18 5.00 250.00 287.50 200.00 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 1.00 250.00 386.07 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 11.00 327.27 261.01 139.98 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 28.00 316.93 402.61 502.13 =============== 250-00200 Material Handling (Stockpile) Cubic Yard ============================================= STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 3.00 50.00 505.00 360.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 212 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 250-00200 Material Handling (Stockpile) Cubic Yard ============================================= NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 5.00 50.00 203.86 7.71 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 50.00 316.78 139.82 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 1.00 15.00 359.71 821.85 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 5.00 1000.00 600.00 600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 835.83 493.21 636.98 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 10.00 100.00 298.58 226.00 SHE0701-245 I-70 MEDIAN CABLE RAIL INSTAL 07/12/18 10.00 45.00 100.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20.00 72.50 270.21 163.00 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 5.00 90.00 83.00 83.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 90.00 83.00 83.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 39.00 187.56 288.37 220.91 =============== 250-00210 Solid Waste Disposal Cubic Yard ============================================= STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 3.00 100.00 762.50 550.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 5.00 200.00 217.31 134.61 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 162.50 421.75 290.38 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 1.00 55.00 560.18 1643.70 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 5.00 1000.00 1100.00 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 842.50 860.08 1190.62 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 10.00 250.00 541.67 91.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 213 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 250-00210 Solid Waste Disposal Cubic Yard ============================================= SHE0701-245 I-70 MEDIAN CABLE RAIL INSTAL 07/12/18 10.00 50.00 300.00 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20.00 150.00 507.14 195.50 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 5.00 100.00 84.00 84.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 100.00 84.00 84.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 39.00 252.69 504.09 353.76 =============== 250-00220 Hazardous Waste Disposal Cubic Yard ============================================= FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 1.00 2500.00 355.20 305.83 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 1.00 2500.00 269.86 255.95 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 1.00 4000.00 703.56 235.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 5.00 250.00 308.41 376.82 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 1281.25 380.26 335.11 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 5.00 1000.00 1100.00 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 1000.00 1100.00 1100.00 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 1.00 300.00 434.73 145.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 300.00 434.73 145.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 1110.71 484.88 594.71 =============== 250-00235 Coating Lead-Based Paint Gallon ================================================= NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 5.00 801.67 1082.48 1082.48 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 801.67 1082.48 1082.48 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 801.67 1082.48 1082.48 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 214 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-01000 ABC (CL 1) Ton ==================================================== NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 2,273.00 30.00 38.75 37.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,273.00 30.00 38.75 37.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,273.00 30.00 38.75 37.00 =============== 304-01005 ABC (CL 1) Cubic Yard ============================================= NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 1.00 250.00 668.30 1250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 250.00 668.30 1250.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1,714.00 82.08 82.10 82.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,714.00 82.08 82.10 82.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,715.00 82.18 83.46 82.78 =============== 304-02000 ABC (CL 2) Ton ==================================================== NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 459.00 50.00 32.33 23.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 459.00 50.00 32.33 23.00 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 804.00 40.00 61.26 52.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 804.00 40.00 61.26 52.00 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 3,482.00 35.00 38.04 31.08 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,482.00 35.00 38.04 31.08 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,745.00 37.30 45.49 33.84 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 215 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-02005 ABC (CL 2) Cubic Yard ============================================= NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 120.00 140.00 145.00 145.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 120.00 140.00 145.00 145.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 120.00 140.00 145.00 145.00 =============== 304-03000 ABC (CL 3) Ton ==================================================== STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 299.25 28.00 36.48 38.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 299.25 28.00 36.48 38.00 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 78.40 44.00 45.00 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 78.40 44.00 45.00 30.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 377.65 31.32 37.46 36.34 =============== 304-05000 ABC (CL 5) Ton ==================================================== CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 400.00 62.72 80.00 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 400.00 62.72 80.00 80.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 400.00 62.72 80.00 80.00 =============== 304-06000 ABC (CL 6) Ton ==================================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 152.00 110.00 62.40 49.80 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 1,813.00 24.75 35.33 50.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 149.63 30.00 41.16 45.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 3,914.00 35.00 40.25 39.00 STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 1,500.00 46.00 44.00 44.00 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 1,948.00 50.00 38.50 32.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 4,938.00 28.00 43.10 38.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 17,509.00 27.00 27.62 21.23 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 216 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-06000 ABC (CL 6) Ton ==================================================== NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 233.00 25.00 34.83 24.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 129.00 50.00 60.12 50.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 543.00 25.00 38.00 36.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 32,828.63 30.65 31.76 29.76 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 339.00 32.00 168.40 48.00 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 2,656.00 30.00 26.27 23.46 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 4,678.00 30.00 39.50 34.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 334.00 50.00 57.62 30.80 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 1,178.00 25.00 38.13 31.35 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 2,104.00 40.00 32.79 24.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 246.78 25.00 58.31 58.22 FBR0705-087 I-70: EMERGENCY BRIDGE G-25-K 05/16/18 8,300.00 40.00 40.00 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 19,835.78 35.26 37.22 34.37 NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 115.00 50.00 38.00 38.00 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 1,060.00 40.00 71.58 54.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 524.00 18.00 49.24 33.83 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 47.00 25.00 182.50 55.00 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 81.00 50.00 50.00 52.00 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 1,000.00 37.00 40.75 28.00 NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 76.00 40.00 44.00 44.00 NHPP070A-032 I-70B & Z GRAND JCT PHASE 1 A 09/20/18 250.00 50.00 33.50 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,153.00 36.58 56.67 39.24 BR1131-006 SH 113 AT MP 11.5 10/11/18 1,291.00 30.00 46.87 31.81 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 44.79 48.00 90.00 30.00 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 1,910.00 30.00 49.55 67.21 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 5,042.00 30.00 32.90 23.65 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 2,444.00 33.00 54.27 44.00 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 1,259.00 60.00 45.10 45.20 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 97.20 65.00 105.00 105.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 12.50 60.00 187.13 53.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 680.00 45.00 80.50 73.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 163.00 71.00 89.28 85.00 STAR100-279 FY20 HMA PREVENTATIVE MAINTEN 12/13/18 1,200.00 26.12 32.50 55.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 217 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-06000 ABC (CL 6) Ton ==================================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 57,100.00 54.73 54.73 54.73 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 71,243.49 50.69 49.88 52.21 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 127,060.90 42.75 38.47 43.30 =============== 304-06007 ABC (CL 6) Cubic Yard ============================================= STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 3.00 50.00 632.43 1200.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 4,313.00 45.00 47.20 45.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 2,100.00 60.00 73.31 53.25 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 21.00 60.00 236.44 360.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 1,188.00 42.00 58.43 67.28 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 55.00 55.00 116.25 125.00 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 72.00 55.00 81.25 58.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 45.00 50.00 153.85 87.69 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7,797.00 48.82 56.89 52.84 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 952.00 50.00 46.45 31.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 552.00 150.00 150.00 150.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 7.00 60.00 147.98 208.93 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,511.00 86.58 57.57 75.30 FBR060A-022 SH 60 over the South Platte 07/12/18 3,490.00 50.00 38.37 30.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 48.00 70.00 106.22 58.65 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 26,487.00 50.04 50.04 50.04 C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 151.00 60.00 72.75 50.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 4,806.00 25.00 29.61 27.50 STA052A-040 SH 52: Antelope Creek 08/23/18 42.00 75.00 114.33 35.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 415.00 70.00 71.06 50.00 M850-027 US24E MANITOU AVE. AT RUXTON 08/28/18 80.00 250.00 140.35 82.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 1,250.00 57.00 58.31 51.00 STM0252-469 R2 ADA RAMPS I-25 INT S NEV- 09/06/18 20.00 38.00 98.00 131.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 2,230.00 30.00 59.17 39.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 39,019.00 46.74 43.03 44.97 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 24,821.00 40.00 35.48 28.69 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 218 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-06007 ABC (CL 6) Cubic Yard ============================================= NHPP0702-366 I-70 Avon to Vail 11/08/18 206.00 55.00 103.17 113.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 16,382.00 27.00 61.13 34.19 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 20.00 100.00 388.33 1000.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 339.00 50.00 108.83 100.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 1,000.00 40.00 54.58 46.11 ER052A-039 SH 170 11/15/18 22.00 80.00 117.71 46.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 5,550.00 83.15 83.16 83.16 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 219.00 50.00 73.69 59.74 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 797.00 40.00 80.40 50.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 3,729.00 35.00 58.24 41.00 C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 130.00 60.00 78.40 60.00 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 64.00 60.00 90.29 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 53,279.00 40.42 51.11 38.96 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 101,606.00 44.18 48.39 42.88 =============== 304-06008 ABC (CL 6) (Spec) Cubic Yard ============================================= FBR060A-022 SH 60 over the South Platte 07/12/18 431.00 57.00 46.40 45.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 1,896.00 50.00 42.00 40.00 STA052A-040 SH 52: Antelope Creek 08/23/18 7.00 80.00 246.33 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,334.00 51.38 43.89 41.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 356.00 42.00 63.03 57.70 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 14,833.00 48.00 45.11 42.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 15,189.00 47.86 45.93 42.37 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17,523.00 48.33 45.50 42.19 =============== 304-06009 ABC (CL 6) (Spec) Ton ==================================================== FSA0711-020 SH 71 & SH 94: PUNKIN CENTER 05/03/18 31.00 60.00 188.33 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 31.00 60.00 188.33 125.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 31.00 60.00 188.33 125.00 =============== 304-06011 ABC (CL 6)(Spec)(Install Only) Cubic Yard ============================================= ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 451.00 79.38 95.00 95.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 451.00 79.38 95.00 95.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 451.00 79.38 95.00 95.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 219 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-07000 ABC (CL 7) Ton ==================================================== STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 7,201.88 32.00 28.11 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7,201.88 32.00 28.11 25.00 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 5,330.11 30.00 21.25 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5,330.11 30.00 21.25 21.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12,531.99 31.15 26.26 23.30 =============== 304-07005 ABC (CL 7) Cubic Yard ============================================= STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 375.00 54.00 72.00 51.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 375.00 54.00 72.00 51.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 966.00 65.00 86.42 97.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 966.00 65.00 86.42 97.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,341.00 61.92 82.38 84.50 =============== 304-07009 ABC (CL 7) (Spec) Ton ==================================================== STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 1,529.00 30.00 27.79 24.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,529.00 30.00 27.79 24.00 BR1131-006 SH 113 AT MP 11.5 10/11/18 221.00 27.00 52.56 36.81 STA052A-045 SH 52B NEW RAYMER SOUTH 12/13/18 12,580.00 26.00 22.38 22.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 12,801.00 26.02 24.05 22.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14,330.00 26.44 24.93 22.88 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 220 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-08000 ABC (Shoulder Material) Ton ==================================================== NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 5,033.00 40.00 21.53 20.58 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5,033.00 40.00 21.53 20.58 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,033.00 40.00 21.53 20.58 =============== 304-08002 ABC (Shoulder Material) Cubic Yard ============================================= STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 1,684.00 60.00 42.00 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,684.00 60.00 42.00 40.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 150.00 45.00 70.31 44.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 670.00 42.00 60.13 47.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 820.00 42.55 61.29 46.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,504.00 54.29 50.48 42.11 =============== 304-09000 ABC (Spec) Cubic Yard ============================================= C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 1,500.00 70.35 70.35 70.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,500.00 70.35 70.35 70.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,500.00 70.35 70.35 70.35 =============== 304-09001 ABC (Spec) (Install Only) Cubic Yard ============================================= C R500-198 R5 GUARDRAIL REPLACEMENT/UPGR 11/29/18 27.80 100.00 355.00 210.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 27.80 100.00 355.00 210.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 27.80 100.00 355.00 210.00 =============== 304-09014 ABC (Spec) Ton ==================================================== NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 5,105.00 35.00 29.50 16.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 221 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-09014 ABC (Spec) Ton ==================================================== ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 3,955.00 40.00 33.10 33.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 4,505.00 23.00 32.16 28.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 13,565.00 32.47 31.81 24.94 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 54.00 40.00 75.40 17.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 54.00 40.00 75.40 17.60 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 7,270.00 30.00 43.82 37.64 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 5,269.00 25.00 25.29 22.36 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 5,512.00 22.00 26.77 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 18,051.00 26.10 31.56 28.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 31,670.00 28.85 31.87 26.90 =============== 304-09100 ABC (RAP) Ton ==================================================== STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 1,181.00 30.00 31.47 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,181.00 30.00 31.47 18.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,181.00 30.00 31.47 18.00 =============== 306-01000 Reconditioning Sq Yard ================================================ FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 607.00 10.00 6.20 7.50 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 3,560.00 2.78 3.00 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,167.00 3.83 4.47 3.66 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 347.00 9.00 27.58 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 347.00 9.00 27.58 35.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,514.00 4.23 10.02 6.07 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 222 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 307-00000 Hydrated Lime Ton ==================================================== STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 985.70 300.00 250.39 256.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 985.70 300.00 250.39 256.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 293.00 320.00 229.15 220.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 293.00 320.00 229.15 220.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,278.70 304.58 245.52 247.75 =============== 310-00608 Full Depth Reclam. of HMA Pvmt (0-8 in.) Sq Yard ================================================ NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 658,997.00 2.40 2.82 2.31 STA052A-045 SH 52B NEW RAYMER SOUTH 12/13/18 135,740.00 2.10 2.06 1.82 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 794,737.00 2.35 2.69 2.23 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 794,737.00 2.35 2.69 2.23 =============== 310-00610 Full Depth Reclam. of HMA Pvmt (8-12 in) Sq Yard ================================================ ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 13,064.00 10.81 6.50 6.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 13,064.00 10.81 6.50 6.50 STA052A-045 SH 52B NEW RAYMER SOUTH 12/13/18 43,516.00 2.40 2.52 2.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 43,516.00 2.40 2.52 2.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 56,580.00 4.34 2.88 3.46 =============== 403-00720 HMA (Patching) (Asph) Ton ==================================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 56.00 200.00 337.47 324.93 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 223 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-00720 HMA (Patching) (Asph) Ton ==================================================== STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 300.00 250.00 168.00 122.00 STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 300.00 300.00 622.50 700.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 367.00 220.00 138.67 150.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 392.00 200.00 134.68 150.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 1,565.00 120.00 173.75 150.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 1,642.00 180.00 106.44 96.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 504.00 150.00 161.25 115.00 STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 250.00 200.00 230.00 230.00 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 60.00 250.00 320.16 330.00 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 25.00 200.00 197.46 175.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 65.00 200.00 210.39 190.60 STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 51.50 325.00 340.33 180.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 739.00 200.00 184.66 157.50 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 52.00 150.00 136.34 111.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 100.00 180.00 222.11 200.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 855.00 120.00 201.01 198.01 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 50.00 229.63 250.00 250.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 69.00 200.00 360.00 320.00 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 50.00 250.00 733.60 488.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7,492.50 174.58 172.81 173.88 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 891.00 146.00 269.00 170.00 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 25.00 180.00 222.65 212.75 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 20.00 175.00 249.60 115.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 652.00 300.00 192.08 191.77 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 50.00 210.00 197.13 225.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 164.00 200.00 244.95 220.00 FSA0711-020 SH 71 & SH 94: PUNKIN CENTER 05/03/18 40.00 165.00 200.00 215.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 278.00 180.00 178.75 165.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 80.00 225.00 344.24 312.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,200.00 205.28 226.14 186.78 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 997.00 200.00 225.00 170.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 863.00 225.00 169.61 150.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 54.00 400.00 361.67 475.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 2,707.00 141.49 141.49 141.49 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 780.00 150.00 402.50 250.00 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 11.00 200.00 468.00 484.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 224 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-00720 HMA (Patching) (Asph) Ton ==================================================== C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 70.00 200.00 518.75 725.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 704.00 140.00 185.12 190.00 M850-027 US24E MANITOU AVE. AT RUXTON 08/28/18 76.00 400.00 265.62 200.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 70.00 130.00 273.51 175.00 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 151.00 200.00 162.00 150.00 STM0252-469 R2 ADA RAMPS I-25 INT S NEV- 09/06/18 20.00 187.00 330.00 375.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 100.00 175.00 266.59 240.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6,603.00 169.75 214.22 177.80 BR1131-006 SH 113 AT MP 11.5 10/11/18 245.00 175.00 341.07 333.33 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 360.10 180.00 177.50 200.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 500.00 175.00 165.04 170.13 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 265.00 185.00 172.11 125.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 584.00 200.00 228.14 175.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 331.00 220.00 292.82 400.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 1,500.00 250.00 229.07 241.50 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 50.00 300.00 376.67 500.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 54.00 250.00 426.17 400.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 34.00 250.00 233.84 245.75 ER052A-039 SH 170 11/15/18 44.00 325.00 259.78 186.00 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 40.00 350.00 250.00 250.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 532.00 190.92 196.46 196.46 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 500.00 150.00 142.29 144.16 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 220.00 250.00 223.60 175.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 524.00 175.00 222.43 225.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 1,433.00 100.00 158.38 110.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 11,453.00 210.00 114.47 100.00 C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 80.00 450.00 341.00 300.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 500.00 225.00 228.81 220.00 STA052A-045 SH 52B NEW RAYMER SOUTH 12/13/18 100.00 172.00 181.67 135.00 STAR100-279 FY20 HMA PREVENTATIVE MAINTEN 12/13/18 100.00 193.48 312.50 400.00 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 150.00 150.00 256.86 275.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 2,155.00 184.35 184.35 184.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 21,754.10 199.99 159.58 147.27 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 38,049.60 190.05 176.30 160.10 =============== 403-00721 HMA (Patching) (Asph) Sq Yard ================================================ NHPP0702-373 I-70 GWC Longitudinal Joint R 01/11/18 10,166.00 35.00 27.50 25.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 1,685.00 96.00 36.74 32.81 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 225 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-00721 HMA (Patching) (Asph) Sq Yard ================================================ NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 72.00 100.00 53.26 26.52 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11,923.00 44.01 30.99 26.11 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 367.00 160.00 150.00 150.00 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 125.00 70.00 211.00 48.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 492.00 137.13 180.83 124.09 NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 30.00 75.00 250.00 250.00 NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 178.00 45.00 50.00 50.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 23.00 100.00 142.75 46.00 NHPP070A-032 I-70B & Z GRAND JCT PHASE 1 A 09/20/18 30.00 100.00 145.00 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 261.00 59.62 106.20 68.04 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 919.00 50.00 52.39 36.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 50.00 150.00 83.63 60.89 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 290.00 250.00 81.47 44.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,259.00 100.04 58.78 38.83 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13,935.00 52.66 38.05 31.51 =============== 403-00800 Emerg Pothole Rep Ton ==================================================== STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 50.00 275.00 560.00 515.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 50.00 275.00 560.00 515.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 300.00 500.00 453.85 117.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 300.00 500.00 453.85 117.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 350.00 467.86 469.01 173.86 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 226 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-02000 HMA (Spec) Ton ==================================================== ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 1,933.00 150.00 117.66 111.75 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,933.00 150.00 117.66 111.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,933.00 150.00 117.66 111.75 =============== 403-09210 SMA Ton ==================================================== C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 42,853.00 101.12 101.12 101.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 42,853.00 101.12 101.12 101.12 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 42,853.00 101.12 101.12 101.12 =============== 403-09221 SMA (Fibers)(Asph) Ton ==================================================== NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 46,581.00 130.00 123.38 112.76 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 36,800.00 102.00 109.75 112.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 83,381.00 117.64 115.03 112.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 83,381.00 117.64 115.03 112.42 =============== 403-09500 Furnish HMA Ton ==================================================== STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 1,310.00 120.00 150.00 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,310.00 120.00 150.00 150.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,310.00 120.00 150.00 150.00 =============== 403-33721 HMA (Gr S) (75) (PG 58-28) Ton ==================================================== ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 3,911.00 108.59 121.00 121.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,911.00 108.59 121.00 121.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,911.00 108.59 121.00 121.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 227 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-33741 HMA (Gr S) (75) (PG 64-22) Ton ==================================================== ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 702.00 100.00 91.25 78.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 15,858.00 92.00 82.38 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16,560.00 92.34 82.84 75.13 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 1,037.00 95.00 112.17 105.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,037.00 95.00 112.17 105.00 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 5,209.00 80.00 75.02 60.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5,209.00 80.00 75.02 60.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 22,806.00 89.64 82.63 73.06 =============== 403-33841 HMA (Gr S) (100) (PG 64-22) Ton ==================================================== NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 400.00 120.00 109.50 104.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 400.00 120.00 109.50 104.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 90,192.00 67.45 67.45 67.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 90,192.00 67.45 67.45 67.45 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 36.12 85.00 213.84 112.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 182,405.00 67.20 67.20 67.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 182,441.12 67.20 67.32 67.21 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 273,033.12 67.36 67.48 67.34 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 228 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-34651 HMA (Gr SX) (50) (PG 64-28) Ton ==================================================== ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 122.00 122.69 137.00 137.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 122.00 122.69 137.00 137.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 122.00 122.69 137.00 137.00 =============== 403-34701 HMA (Gr SX) (75) Ton ==================================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 7,331.00 90.00 102.63 112.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 33,379.64 59.34 63.04 57.60 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 39,499.00 60.00 55.50 54.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 80,209.64 62.47 61.04 60.80 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 21,797.04 55.00 54.00 50.00 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 12,633.00 70.00 93.23 67.20 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 1,506.00 120.00 162.42 140.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 5,085.00 93.34 96.04 96.04 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 41,021.04 66.76 83.34 64.31 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 121,230.68 63.92 66.87 61.99 =============== 403-34721 HMA (Gr SX) (75) (PG 58-28) Ton ==================================================== NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 1,795.00 75.00 106.11 102.00 NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 22,817.00 79.00 79.01 66.13 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 24,612.00 78.71 80.98 68.75 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 1,548.00 130.00 123.74 114.54 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 1,541.00 85.00 114.40 111.00 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 2,503.00 120.00 117.50 130.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 916.00 100.00 148.17 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6,508.00 111.28 124.66 123.23 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 229 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-34721 HMA (Gr SX) (75) (PG 58-28) Ton ==================================================== BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 4,762.00 85.00 91.66 93.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 13,288.00 75.00 94.28 82.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 18,050.00 77.64 93.04 84.90 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 75,718.00 70.00 73.57 75.20 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 4,729.00 80.00 136.67 118.33 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 80,447.00 70.59 76.09 77.74 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 129,617.00 75.15 84.24 79.31 =============== 403-34731 HMA (Gr SX) (75) (PG 58-34) Ton ==================================================== NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 29,883.00 80.00 91.63 89.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 34,650.00 88.00 96.65 92.40 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 64,533.00 84.30 95.14 90.83 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 21,058.00 83.00 85.24 82.72 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 34,098.00 83.00 78.34 74.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 55,156.00 83.00 80.97 77.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 119,689.00 83.70 90.97 84.61 =============== 403-34741 HMA (Gr SX) (75) (PG 64-22) Ton ==================================================== ER144A-002 SH 144 East and West of Goodr 03/08/18 7,467.00 85.00 85.70 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7,467.00 85.00 85.70 80.00 STA052A-040 SH 52: Antelope Creek 08/23/18 90.00 185.00 282.83 252.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 90.00 185.00 282.83 252.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 230 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-34741 HMA (Gr SX) (75) (PG 64-22) Ton ==================================================== STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 541.00 100.00 166.40 150.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 30,063.00 83.00 90.34 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 30,604.00 83.30 91.47 81.24 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 38,161.00 83.87 90.20 81.40 =============== 403-34751 HMA (Gr SX) (75) (PG 64-28) Ton ==================================================== ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 6,470.00 90.00 98.63 90.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 17,915.00 97.50 89.00 83.00 ER144A-002 SH 144 East and West of Goodr 03/08/18 3,438.00 92.00 100.42 96.65 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 10,237.00 88.00 104.99 96.00 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 1,231.00 102.97 402.49 337.47 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 39,291.00 93.48 103.16 96.71 FSA0711-020 SH 71 & SH 94: PUNKIN CENTER 05/03/18 890.00 140.00 133.33 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 890.00 140.00 133.33 110.00 FBR060A-022 SH 60 over the South Platte 07/12/18 5,040.00 88.00 84.95 76.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5,040.00 88.00 84.95 76.00 BR1131-006 SH 113 AT MP 11.5 10/11/18 591.00 120.00 159.44 155.56 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 3,607.00 95.00 94.31 80.05 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 3,796.00 100.00 150.29 131.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 4,595.00 140.00 126.45 131.25 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 2,580.00 135.00 105.96 109.10 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 19,662.00 110.00 105.21 100.00 STA052A-045 SH 52B NEW RAYMER SOUTH 12/13/18 54,603.00 83.00 82.02 78.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 89,434.00 94.81 98.58 89.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 134,655.00 94.47 99.06 91.13 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 231 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-34771 HMA (Gr SX) (75) (PG 76-28) Ton ==================================================== STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 25,931.00 85.00 84.06 84.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 25,931.00 85.00 84.06 84.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25,931.00 85.00 84.06 84.42 =============== 403-34801 HMA (Gr SX) (100) Ton ==================================================== FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 621.00 140.00 117.92 100.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 1,007.00 100.00 129.71 136.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,628.00 115.26 126.11 122.36 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 38,021.00 55.00 53.26 52.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 38,021.00 55.00 53.26 52.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 38,877.00 60.00 82.57 67.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 38,877.00 60.00 82.57 67.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 78,526.00 58.72 69.93 60.88 =============== 403-34841 HMA (Gr SX) (100) (PG 64-22) Ton ==================================================== FBR0705-087 I-70: EMERGENCY BRIDGE G-25-K 05/16/18 4,000.00 115.00 115.00 115.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4,000.00 115.00 115.00 115.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 24,497.00 67.98 67.98 67.98 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 2,096.00 110.00 170.37 139.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 26,593.00 71.29 106.33 73.58 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 232 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-34841 HMA (Gr SX) (100) (PG 64-22) Ton ==================================================== STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 9,133.00 90.00 79.15 65.35 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 7,772.00 84.00 94.15 105.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 72,222.00 68.78 68.78 68.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 89,127.00 72.28 77.13 71.59 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 119,720.00 73.49 84.21 73.48 =============== 403-34851 HMA (Gr SX) (100) (PG 64-28) Ton ==================================================== SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 1,844.00 150.00 120.00 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,844.00 150.00 120.00 125.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 3,660.00 90.00 101.23 103.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 4,433.25 95.00 103.89 93.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8,093.25 92.74 102.75 97.52 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,937.25 103.36 103.46 102.62 =============== 403-34871 HMA (Gr SX) (100) (PG 76-28) Ton ==================================================== SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 991.00 130.00 103.33 95.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 5,471.00 105.00 117.17 120.29 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 230.00 120.00 144.50 114.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6,692.00 109.22 116.48 116.33 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 305.00 200.00 159.07 150.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 27,893.22 80.00 81.11 76.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 28,198.22 81.30 82.37 77.49 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 1,327.00 130.00 211.00 225.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 233 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-34871 HMA (Gr SX) (100) (PG 76-28) Ton ==================================================== STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 34,792.00 80.00 83.59 72.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 36,119.00 81.84 85.97 77.96 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 71,009.22 84.20 88.88 81.39 =============== 403-36701 HMA (Gr ST)(75) Ton ==================================================== NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 2,625.82 70.00 62.60 67.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,625.82 70.00 62.60 67.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,625.82 70.00 62.60 67.20 =============== 403-36721 HMA (Gr ST)(75)(PG 58-28) Ton ==================================================== STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 36,769.00 70.00 77.26 68.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 10,424.00 88.00 110.52 109.36 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 22,532.00 75.00 86.70 86.00 NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 12,985.00 84.00 81.87 67.61 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 82,710.00 75.83 86.97 78.05 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 35,717.00 70.00 91.12 82.24 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 28.20 200.00 640.83 268.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 14,156.00 82.00 83.44 86.81 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 24,438.00 85.00 77.67 72.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 74,339.20 77.27 84.70 79.81 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 157,049.20 76.51 86.20 78.89 =============== 405-00100 Heating and Remixing Treatment Sq Yard ================================================ STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 108,308.00 5.80 6.00 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 108,308.00 5.80 6.00 6.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 108,308.00 5.80 6.00 6.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 234 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 406-09500 Cold Bitum Pvmt (Recycle) Sq Yard ================================================ STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 258,877.00 4.50 4.13 3.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 258,877.00 4.50 4.13 3.75 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 117,812.00 3.00 4.59 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 117,812.00 3.00 4.59 5.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 376,689.00 4.03 4.27 4.14 =============== 408-01000 Hot Joint-Crack Sealant Ton ==================================================== MTCER500-203 WITHIN CDOT'S R5 MAINTENANCE 03/08/18 50.52 3831.41 4925.00 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 50.52 3831.41 4925.00 3000.00 MTCE R100-312 R1 CHIP SEAL 05/17/18 10.00 4500.00 4500.00 4500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 4500.00 4500.00 4500.00 MTCE0704-244 Crack Seal I-70 MP 328 TO MP 09/27/18 118.00 3650.00 4035.00 4035.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 118.00 3650.00 4035.00 4035.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 0.20 4000.00 16932.40 5000.00 STAR100-279 FY20 HMA PREVENTATIVE MAINTEN 12/13/18 25.00 4000.00 5575.00 6000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 25.20 4000.00 5753.86 5992.06 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 203.72 3780.01 4684.99 4043.25 =============== 408-01100 Joint Sealant Lin Foot =============================================== STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 80.00 20.00 25.36 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 80.00 20.00 25.36 30.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 235 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 408-01100 Joint Sealant Lin Foot =============================================== ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 4,400.00 10.00 3.90 5.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 382.00 15.00 49.50 18.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 138.00 18.00 24.28 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,920.00 10.61 9.76 6.09 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,000.00 10.76 10.23 6.48 =============== 409-01010 CC Matl (Ty I) Ton ==================================================== STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 1,799.00 60.00 50.00 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,799.00 60.00 50.00 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,799.00 60.00 50.00 50.00 =============== 409-01015 CC Matl (Ty I) Sq Yard ================================================ NHPP5502-096 US550 STRIPING & RUMBLE STRIP 03/01/18 129,012.00 1.00 1.01 1.03 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 129,012.00 1.00 1.01 1.03 MTCE R100-312 R1 CHIP SEAL 05/17/18 226,453.00 0.90 2.67 2.67 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 226,453.00 0.90 2.67 2.67 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 48,035.00 1.00 1.62 1.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 48,035.00 1.00 1.62 1.60 STAR100-279 FY20 HMA PREVENTATIVE MAINTEN 12/13/18 348,273.00 2.70 3.14 2.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 348,273.00 2.70 3.14 2.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 751,773.00 1.76 2.22 2.24 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 236 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 409-02015 CC Matl (Ty II) Sq Yard ================================================ NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 7,859.00 3.00 2.31 2.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 96,346.00 1.50 1.54 1.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 104,205.00 1.61 1.62 1.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 104,205.00 1.61 1.62 1.45 =============== 409-02030 CC Matl (Ty I) (Special) Sq Yard ================================================ MTCE0712-017 SH 71 CHIP SEAL MP 123 TO MP 01/18/18 265,751.00 1.75 2.04 2.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 265,751.00 1.75 2.04 2.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 265,751.00 1.75 2.04 2.55 =============== 409-09500 Slurry Seal Matl Sq Yard ================================================ STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 45,840.00 2.00 2.67 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 45,840.00 2.00 2.67 3.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 45,840.00 2.00 2.67 3.00 =============== 411-03342 Asph Cem (PG 64-28) Ton ==================================================== STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 2,069.92 500.00 514.93 400.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 61.00 750.00 428.28 435.66 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,130.92 507.16 510.68 401.02 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 1,307.82 500.00 525.00 600.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 2,331.00 400.00 551.79 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,638.82 435.94 545.92 471.88 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,769.74 462.24 531.06 445.71 =============== 411-03345 Asph Cem (PG 76-28) Ton ==================================================== FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 38.00 750.00 562.24 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 38.00 750.00 562.24 400.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 237 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 411-03345 Asph Cem (PG 76-28) Ton ==================================================== NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 1,560.00 340.00 455.44 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,560.00 340.00 455.44 350.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,598.00 349.75 458.60 351.19 =============== 411-03352 Asph Cem (PG 58-28) Ton ==================================================== STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 80.00 550.00 475.00 475.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 80.00 550.00 475.00 475.00 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 749.00 500.00 470.76 455.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 21.00 600.00 596.00 503.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 94.00 477.28 491.15 491.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 864.00 499.96 476.26 460.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 944.00 504.20 476.23 461.36 =============== 411-03354 Asph Cem (PG 64-22) Ton ==================================================== NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 836.00 300.00 331.18 290.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 836.00 300.00 331.18 290.00 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 170.67 440.00 400.00 450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 170.67 440.00 400.00 450.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,006.67 323.74 337.56 317.13 =============== 411-03355 Asph Cem (PG 58-34) Ton ==================================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 440.00 600.00 630.00 690.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 238 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 411-03355 Asph Cem (PG 58-34) Ton ==================================================== NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 2,372.00 600.00 463.75 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,812.00 600.00 477.86 361.02 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 69.00 680.00 868.50 714.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 193.00 715.92 736.71 736.71 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 262.00 706.46 826.60 730.73 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,074.00 609.07 497.15 392.53 =============== 411-10216 Emul Asph (CRS-2P) Gallon ================================================= STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 65,122.00 2.00 1.50 1.50 NHPP5502-096 US550 STRIPING & RUMBLE STRIP 03/01/18 64,506.00 2.15 1.58 1.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 129,628.00 2.07 1.56 1.70 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 3,930.00 8.00 3.20 2.82 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 68,303.00 1.90 2.43 2.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 72,233.00 2.23 2.49 2.61 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 201,861.00 2.13 2.01 2.03 =============== 411-10217 Emulsified Asphalt (CRS-2P) Ton ==================================================== MTCE0712-017 SH 71 CHIP SEAL MP 123 TO MP 01/18/18 632.00 375.00 238.33 115.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 632.00 375.00 238.33 115.00 MTCE R100-312 R1 CHIP SEAL 05/17/18 335.00 450.00 624.00 624.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 335.00 450.00 624.00 624.00 STAR100-279 FY20 HMA PREVENTATIVE MAINTEN 12/13/18 854.00 656.00 325.00 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 854.00 656.00 325.00 500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,821.00 520.58 308.71 389.19 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 239 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 411-10253 Emul Asph (CSS-1H) Gallon ================================================= STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 3,128.00 3.98 7.40 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,128.00 3.98 7.40 4.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,128.00 3.98 7.40 4.00 =============== 411-10255 Emul Asph (SS) Gallon ================================================= STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 19,972.00 4.00 2.98 3.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 384.00 7.00 4.17 2.50 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 15,275.00 4.00 3.20 3.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 17,978.00 5.00 2.63 3.00 NHPP0702-373 I-70 GWC Longitudinal Joint R 01/11/18 508.00 4.00 5.25 5.50 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 495.00 7.00 4.83 4.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 9,306.00 3.50 3.05 3.28 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 795.00 6.00 9.16 5.45 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 36,599.00 3.00 3.16 3.00 NHPP5502-096 US550 STRIPING & RUMBLE STRIP 03/01/18 9,047.00 2.50 2.84 1.45 NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 23,157.00 4.00 3.16 2.98 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 197.00 4.00 4.30 4.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 133,713.00 3.76 3.11 2.94 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 287.00 5.00 5.07 4.26 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 531.00 3.60 5.37 4.25 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 2,220.00 5.00 5.25 3.50 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 529.00 6.50 8.16 8.80 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 15,355.00 3.50 3.27 3.50 FSA0711-020 SH 71 & SH 94: PUNKIN CENTER 05/03/18 417.00 4.00 5.00 5.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 9,825.00 3.75 3.88 5.65 FBR0705-087 I-70: EMERGENCY BRIDGE G-25-K 05/16/18 1,800.00 3.00 3.00 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 30,964.00 3.73 3.83 4.28 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 878.00 10.00 8.97 5.64 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 243.00 3.50 6.37 5.56 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 45,380.00 2.53 2.53 2.53 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 4,061.00 4.00 3.89 4.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 240 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 411-10255 Emul Asph (SS) Gallon ================================================= FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 1,204.00 3.60 8.39 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 51,766.00 2.80 4.24 2.82 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 12,295.00 4.00 2.75 3.00 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 7,033.00 3.50 3.48 2.50 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 24,359.00 3.00 4.11 3.08 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 2,717.00 4.00 3.06 2.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 1,693.00 3.50 3.94 3.15 NHPP0702-366 I-70 Avon to Vail 11/08/18 17,709.00 3.50 3.29 3.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 1,690.00 8.00 5.58 3.15 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 58,697.00 3.00 3.27 2.54 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 340.00 4.50 5.57 3.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1,150.00 10.61 10.91 10.91 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 9,429.00 4.00 3.87 2.96 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 488.00 5.00 16.50 18.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 14,376.00 3.00 3.26 2.50 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 20,072.00 3.00 3.65 2.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 21,855.00 4.00 2.82 2.46 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 25,494.00 5.00 6.15 9.34 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 36,852.00 4.00 2.95 3.00 STA052A-045 SH 52B NEW RAYMER SOUTH 12/13/18 8,852.00 2.80 3.13 2.45 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 52,495.00 2.84 2.84 2.84 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 317,596.00 3.49 3.66 3.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 534,039.00 3.50 3.52 3.22 =============== 411-90010 Asph Rejuvenating Agent Gallon ================================================= STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 7,135.00 3.75 2.75 2.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7,135.00 3.75 2.75 2.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,135.00 3.75 2.75 2.75 =============== 411-90040 Recycling Agent Gallon ================================================= STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 362,428.00 2.00 2.14 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 362,428.00 2.00 2.14 2.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 241 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 411-90040 Recycling Agent Gallon ================================================= STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 163,527.00 2.30 2.83 2.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 163,527.00 2.30 2.83 2.70 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 525,955.00 2.09 2.35 2.22 =============== 412-00190 Conc Pvmt (Patching) Sq Yard ================================================ STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 4.00 275.00 179.17 142.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 275.00 179.17 142.50 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 1,959.00 114.08 114.08 114.08 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 50.00 180.00 250.75 310.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,009.00 115.72 126.74 118.96 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 64.00 500.00 283.33 400.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 76.00 350.00 141.41 280.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 1,361.00 110.00 114.33 85.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1,370.00 114.20 114.20 114.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,871.00 127.05 119.87 111.12 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,884.00 122.51 121.51 114.37 =============== 412-00600 Conc Pvmt (6 In) Sq Yard ================================================ ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 137.00 95.00 73.95 70.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 137.00 95.00 73.95 70.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 21.00 55.00 125.87 160.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 21.00 55.00 125.87 160.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 242 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 412-00600 Conc Pvmt (6 In) Sq Yard ================================================ STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 576.00 72.00 117.14 104.00 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 374.00 100.00 107.65 112.59 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 704.00 63.00 118.00 117.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 4,882.00 52.00 59.28 53.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6,536.00 57.69 77.21 67.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,694.00 58.45 77.27 68.13 =============== 412-00605 Conc Pvmt (6 In) (Fast Track) Sq Yard ================================================ NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 68.00 130.00 200.00 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 68.00 130.00 200.00 200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 68.00 130.00 200.00 200.00 =============== 412-00800 Conc Pvmt (8 In) Sq Yard ================================================ STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 44.00 150.00 193.75 180.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 327.00 90.00 99.35 130.00 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 242.00 200.00 161.25 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 613.00 137.73 124.71 141.48 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 613.00 137.73 124.71 141.48 =============== 412-00805 Conc Pvmt (8 In) (Fast Track) Sq Yard ================================================ NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 158.00 75.00 447.50 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 158.00 75.00 447.50 400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 158.00 75.00 447.50 400.00 =============== 412-00815 Conc Pvmt (8 In) (R) Sq Yard ================================================ FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 48.00 220.00 218.06 251.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 48.00 220.00 218.06 251.12 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 48.00 220.00 218.06 251.12 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 243 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 412-00900 Conc Pvmt (9 In) Sq Yard ================================================ NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 178.00 75.00 125.00 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 178.00 75.00 125.00 125.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 3,593.00 67.00 137.57 103.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 4,033.00 78.86 77.54 77.54 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 50,482.00 47.00 58.20 58.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 58,108.00 50.45 67.17 62.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 58,286.00 50.52 67.22 62.33 =============== 412-00901 Conc Pvmt (9 In) (Spec) Sq Yard ================================================ NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 1,061.00 210.00 195.00 195.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,061.00 210.00 195.00 195.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 408.00 98.14 96.93 96.93 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 408.00 98.14 96.93 96.93 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,469.00 178.93 167.76 167.76 =============== 412-00920 Conc Pvmt (9 In) (Fast Track) Sq Yard ================================================ NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 89.00 114.21 113.07 113.07 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 5,447.00 97.00 73.70 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5,536.00 97.28 73.86 80.53 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,536.00 97.28 73.86 80.53 =============== 412-01000 Conc Pvmt (10 In) Sq Yard ================================================ STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 84.00 150.00 100.00 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 84.00 150.00 100.00 125.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 244 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 412-01000 Conc Pvmt (10 In) Sq Yard ================================================ STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 105.00 90.00 104.25 101.00 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 143.00 150.00 132.50 95.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 248.00 124.60 124.91 97.54 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 6,435.00 85.25 85.25 85.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6,435.00 85.25 85.25 85.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,767.00 87.50 90.01 86.19 =============== 412-01020 Conc Pvmt (10 In) (Fast Track) Sq Yard ================================================ C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 102.00 130.00 150.00 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 102.00 130.00 150.00 150.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 102.00 130.00 150.00 150.00 =============== 412-01100 Conc Pvmt (11 In) Sq Yard ================================================ NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 7,979.00 73.00 85.33 70.00 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 9.00 75.00 460.76 565.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7,988.00 73.00 85.62 70.56 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,988.00 73.00 85.62 70.56 =============== 412-01105 Conc Pvmt (11 In) (Spec) Sq Yard ================================================ NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 1,325.00 88.00 95.94 87.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,325.00 88.00 95.94 87.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,325.00 88.00 95.94 87.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 245 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 412-01150 Conc Pvmt (11-1/2 In) Sq Yard ================================================ FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 161.00 200.00 157.25 175.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 161.00 200.00 157.25 175.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 161.00 200.00 157.25 175.00 =============== 412-01200 Conc Pvmt (12 In) Sq Yard ================================================ NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 686,019.00 46.00 49.01 45.64 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 686,019.00 46.00 49.01 45.64 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 686,019.00 46.00 49.01 45.64 =============== 412-01250 Conc Pvmt (12-1/2 In) Sq Yard ================================================ BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 1,000.00 44.00 132.94 113.13 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 2,218.00 54.00 112.50 115.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,218.00 50.89 125.01 114.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,218.00 50.89 125.01 114.42 =============== 412-01252 Conc Pvmt (12-1/2 In) (Fast Track) Sq Yard ================================================ NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 1,843.00 60.00 140.00 130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,843.00 60.00 140.00 130.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,843.00 60.00 140.00 130.00 =============== 412-01300 Conc Pvmt (13 In) Sq Yard ================================================ NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 400.00 122.73 122.73 122.73 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 400.00 122.73 122.73 122.73 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 400.00 122.73 122.73 122.73 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 246 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 412-02000 Conc Safety Edge Lin Foot =============================================== NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 306,944.00 1.75 1.87 2.02 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 306,944.00 1.75 1.87 2.02 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 306,944.00 1.75 1.87 2.02 =============== 412-05100 Poly Slab Jacking Pound ================================================== STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 910.00 7.00 20.98 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 910.00 7.00 20.98 18.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 910.00 7.00 20.98 18.00 =============== 412-13000 Conc Pavement Joint Repair Each =================================================== STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 2.00 5000.00 2821.52 850.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 5000.00 2821.52 850.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 5000.00 2821.52 850.00 =============== 412-14000 Sawing and Sealing Joints Lin Foot =============================================== NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 222.00 10.00 15.50 7.00 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 14,149.00 4.00 7.90 3.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 14,371.00 4.09 8.02 3.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14,371.00 4.09 8.02 3.85 =============== 420-00000 Geomembrane Sq Yard ================================================ NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 1,000.00 15.00 37.18 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,000.00 15.00 37.18 55.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 140.00 35.00 29.91 6.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 247 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 420-00000 Geomembrane Sq Yard ================================================ C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 5,155.00 10.98 10.98 10.98 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5,295.00 11.62 14.00 10.85 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 209.00 50.00 40.50 26.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 9,649.00 10.98 10.98 10.98 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9,858.00 11.81 12.21 11.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16,153.00 11.94 17.70 13.86 =============== 420-00102 Geotextile (Er Cont) (CL 1) Sq Yard ================================================ FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 1,570.00 22.00 8.78 5.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 378.00 8.00 5.37 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,948.00 19.28 7.83 5.00 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 14,351.00 4.00 3.62 4.53 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 7.00 3.50 43.54 59.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 59.00 4.00 5.83 3.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 14,417.00 4.00 3.67 4.55 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 1,873.00 3.50 4.04 3.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 40.00 5.85 16.36 4.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 2,032.00 10.00 4.38 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,945.00 6.87 4.31 4.04 NHPP0702-366 I-70 Avon to Vail 11/08/18 14.00 10.00 36.11 50.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 1,931.00 5.00 4.96 4.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 1,425.00 6.09 10.94 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,370.00 5.48 7.58 4.19 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 23,680.00 5.95 4.97 4.45 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 248 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 420-00104 Geotextile (Er Cont) (CL 3) Sq Yard ================================================ ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 5,410.00 5.00 3.21 4.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,410.00 5.00 3.21 4.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,410.00 5.00 3.21 4.00 =============== 420-00112 Geotextile (Drain) (CL 1) Sq Yard ================================================ SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 349.00 5.00 5.00 5.00 ER144A-002 SH 144 East and West of Goodr 03/08/18 59.00 10.00 15.32 11.07 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 408.00 5.72 8.72 5.88 ER055A-001 PR SH 55 FLOOD REPAIR 2015 06/28/18 1,123.00 4.00 4.59 5.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,123.00 4.00 4.59 5.75 FBR060A-022 SH 60 over the South Platte 07/12/18 508.00 5.00 5.04 4.00 STA052A-040 SH 52: Antelope Creek 08/23/18 265.00 5.00 5.04 6.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 773.00 5.00 5.04 4.94 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 8.00 25.00 45.00 100.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 1,320.00 7.00 4.02 2.20 STA086A-051 SH 86; WEST OF I-70 11/29/18 93.00 6.50 27.97 11.40 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 12.00 45.00 55.58 101.33 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,433.00 7.39 5.78 4.17 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,737.00 5.69 5.29 4.99 =============== 420-00113 Geotextile (Drain) (CL 2) Sq Yard ================================================ ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 2,555.00 3.00 3.47 1.75 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 249 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 420-00113 Geotextile (Drain) (CL 2) Sq Yard ================================================ STA0342-060 US 34D OVERLAY AND BRIDGE WOR -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,555.00 3.00 3.47 1.75 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 10.00 95.00 23.54 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 95.00 23.54 5.00 BR1131-006 SH 113 AT MP 11.5 10/11/18 179.00 15.00 8.61 2.23 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 34.00 10.00 44.50 29.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 213.00 14.20 9.92 6.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,778.00 4.19 4.42 2.13 =============== 420-00114 Geotextile (Drain) (CL 3) Sq Yard ================================================ ER1151-033 PR SH 115-MP 34.7 01/25/18 1,152.00 5.39 2.95 3.25 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,152.00 5.39 2.95 3.25 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 272.00 5.00 15.00 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 272.00 5.00 15.00 13.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,424.00 5.31 4.22 5.11 =============== 420-00132 Geotextile (Separator) (CL 1) Sq Yard ================================================ STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 500.00 6.00 4.46 1.35 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 2,532.00 3.00 3.94 2.00 NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 311.00 3.00 5.51 2.49 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,343.00 3.45 4.16 1.95 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 250 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 420-00132 Geotextile (Separator) (CL 1) Sq Yard ================================================ FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 1,641.00 4.00 3.83 1.66 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,641.00 4.00 3.83 1.66 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 13,524.00 3.00 2.62 1.65 STA086A-051 SH 86; WEST OF I-70 11/29/18 1,500.00 3.00 4.50 4.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 15,024.00 3.00 2.84 1.90 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20,008.00 3.16 3.16 1.89 =============== 420-00133 Geotextile (Separator) (CL 2) Sq Yard ================================================ NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 12.00 10.00 59.02 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.00 10.00 59.02 100.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 68,100.00 2.00 1.66 1.74 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 68,100.00 2.00 1.66 1.74 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 68,112.00 2.00 1.67 1.76 =============== 420-00134 Geotextile (Separator) (CL 3) Sq Yard ================================================ NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 1,884.00 5.00 4.19 1.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,884.00 5.00 4.19 1.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,884.00 5.00 4.19 1.75 =============== 420-00200 Geotextile (Weed Barrier) Sq Yard ================================================ NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 56.00 10.50 10.50 10.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 56.00 10.50 10.50 10.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 56.00 10.50 10.50 10.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 251 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 420-00300 Geotextile (Reinforcement) Sq Yard ================================================ C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 1,500.00 5.78 5.78 5.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,500.00 5.78 5.78 5.78 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1,500.00 5.78 5.78 5.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,500.00 5.78 5.78 5.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,000.00 5.78 5.78 5.78 =============== 420-00510 Geotextile (Cr Reduc) (H D) Sq Yard ================================================ NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 2,552.00 20.00 12.08 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,552.00 20.00 12.08 10.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,552.00 20.00 12.08 10.00 =============== 420-00520 Geogrid Pvmt Reinf Sq Yard ================================================ NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 3,917.00 4.00 5.23 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,917.00 4.00 5.23 9.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 34,176.00 14.70 14.70 14.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 34,176.00 14.70 14.70 14.70 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 38,093.00 13.60 11.72 14.11 =============== 501-00000 Steel Sheet Pile (Ty I) Sq Foot ================================================ STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 1,060.00 20.00 38.88 26.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,060.00 20.00 38.88 26.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,060.00 20.00 38.88 26.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 252 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 501-00200 Steel Sheet Pile (Ty II) Sq Foot ================================================ ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 898.00 45.00 111.80 35.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 518.00 55.00 59.26 25.17 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,416.00 48.66 88.33 31.40 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 6,039.00 35.00 30.00 30.00 ER055A-001 PR SH 55 FLOOD REPAIR 2015 06/28/18 40,115.00 30.00 32.70 31.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 46,154.00 30.65 32.60 31.52 ER052A-039 SH 170 11/15/18 150.00 50.00 61.55 56.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 150.00 50.00 61.55 56.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 47,720.00 31.25 33.61 31.59 =============== 501-00210 Steel Sheet Piling Cap Lin Foot =============================================== STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 107.00 50.00 84.86 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 107.00 50.00 84.86 50.00 ER052A-039 SH 170 11/15/18 25.00 50.00 148.42 49.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 25.00 50.00 148.42 49.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 132.00 50.00 92.96 49.81 =============== 502-00100 Drill Hole Fac Pile Driving Lin Foot =============================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 340.00 472.63 481.81 481.81 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 340.00 472.63 481.81 481.81 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 340.00 472.63 481.81 481.81 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 253 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 502-00210 Drive Timber Piling Lin Foot =============================================== ER055A-001 PR SH 55 FLOOD REPAIR 2015 06/28/18 12,780.00 22.50 26.59 17.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12,780.00 22.50 26.59 17.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12,780.00 22.50 26.59 17.50 =============== 502-00460 Pile Tip Each =================================================== STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 10.00 150.00 189.35 160.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 150.00 189.35 160.00 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 20.00 150.00 177.46 120.82 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20.00 150.00 177.46 120.82 FBR060A-022 SH 60 over the South Platte 07/12/18 12.00 160.00 196.83 175.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 36.00 140.00 187.26 215.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 12.00 160.00 255.70 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 60.00 148.00 199.38 224.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 162.00 186.73 186.73 186.73 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 162.00 186.73 186.73 186.73 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 252.00 173.14 192.36 189.31 =============== 502-00500 CJP Splice Each =================================================== STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 10.00 400.00 607.72 105.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 400.00 607.72 105.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 254 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 502-00500 CJP Splice Each =================================================== FBR060A-022 SH 60 over the South Platte 07/12/18 12.00 400.00 1122.86 1.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 72.00 105.00 546.51 1258.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 12.00 607.72 691.54 600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 96.00 204.72 646.91 1018.63 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 17.00 1779.45 1779.45 1779.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 17.00 1779.45 1779.45 1779.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 123.00 438.24 662.33 1049.50 =============== 502-11254 Steel Piling (HP 12X53) (Install Only) Lin Foot =============================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 92.00 112.39 136.55 136.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 92.00 112.39 136.55 136.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 92.00 112.39 136.55 136.55 =============== 502-11274 Steel Pile (HP 12x74) Lin Foot =============================================== FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 1,323.00 75.00 84.90 55.41 FBR0705-087 I-70: EMERGENCY BRIDGE G-25-K 05/16/18 1,660.00 75.00 75.00 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,983.00 75.00 83.79 66.31 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 255.00 70.00 76.72 77.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 360.00 80.00 111.78 115.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 615.00 75.85 94.15 99.24 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,598.00 75.15 86.42 71.94 =============== 502-11489 Steel Pile (HP 14x89) Lin Foot =============================================== STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 528.00 85.00 86.63 77.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 528.00 85.00 86.63 77.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 255 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 502-11489 Steel Pile (HP 14x89) Lin Foot =============================================== FBR060A-022 SH 60 over the South Platte 07/12/18 638.00 85.00 94.28 95.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 925.00 80.00 97.37 90.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 380.00 105.00 118.06 92.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,943.00 86.53 100.35 92.03 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 10,282.00 91.75 91.75 91.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10,282.00 91.75 91.75 91.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12,753.00 90.68 96.24 91.18 =============== 502-11490 Steel Piling (HP 14X89) (Install Only) Lin Foot =============================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 695.00 35.02 40.67 40.67 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 695.00 35.02 40.67 40.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 695.00 35.02 40.67 40.67 =============== 503-00012 Drilled Caisson (12 In) Lin Foot =============================================== FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 10.50 200.00 183.25 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.50 200.00 183.25 125.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.50 200.00 183.25 125.00 =============== 503-00018 Drilled Caisson (18 In) Lin Foot =============================================== NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPL 04/05/18 5.00 300.00 166.33 97.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 24.00 208.87 148.72 89.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 10.00 205.00 180.20 180.81 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 39.00 219.56 156.38 113.57 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 256 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 503-00018 Drilled Caisson (18 In) Lin Foot =============================================== NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 5.00 325.00 305.63 313.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 5.00 362.72 362.72 362.72 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 343.86 313.79 337.86 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 15.00 300.00 211.36 145.00 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 45.00 400.00 293.33 290.00 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 119.00 185.00 248.33 205.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 179.00 248.69 254.16 221.34 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 228.00 247.88 232.47 208.02 =============== 503-00024 Drilled Caisson (24 In) Lin Foot =============================================== NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 288.00 300.00 218.50 167.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 288.00 300.00 218.50 167.00 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 36.00 350.00 339.50 229.00 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 21.00 175.00 249.00 250.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 115.00 384.30 384.30 384.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 172.00 351.57 324.60 335.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 460.00 319.28 254.19 229.97 =============== 503-00030 Drilled Caisson (30 In) Lin Foot =============================================== NH0242-071 US 24 & 31ST STREET and US24 05/03/18 13.00 395.00 413.15 420.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 13.00 395.00 413.15 420.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 1,188.00 140.00 425.38 459.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,188.00 140.00 425.38 459.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,201.00 142.76 425.18 458.58 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 257 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 503-00036 Drilled Caisson (36 In) Lin Foot =============================================== CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 553.00 1742.37 1300.00 1300.00 STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 285.00 360.00 360.33 350.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 76.00 400.00 337.50 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 914.00 1199.71 691.21 924.78 NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPL 04/05/18 19.00 350.00 376.67 350.00 STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 14.50 450.00 363.75 460.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 190.00 500.00 297.84 301.34 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 209.00 1300.00 1250.00 1250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 432.50 878.32 489.09 767.22 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 19.00 435.00 523.33 525.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 36.00 396.67 396.67 396.67 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 133.00 500.00 481.75 511.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 90.00 360.00 374.75 325.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 278.00 436.85 434.27 436.94 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 76.00 450.00 378.53 325.00 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 113.00 500.00 491.67 660.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 243.00 315.00 337.56 375.00 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 152.00 375.00 431.67 335.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 5,937.00 188.08 188.08 188.08 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6,521.00 205.62 241.48 208.24 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,145.50 360.78 338.80 326.13 =============== 503-00042 Drilled Caisson (42 In) Lin Foot =============================================== NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 49.00 750.00 1989.70 1379.39 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 36.00 500.00 602.50 680.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 85.00 644.12 1402.18 1083.18 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 258 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 503-00042 Drilled Caisson (42 In) Lin Foot =============================================== NH0242-071 US 24 & 31ST STREET and US24 05/03/18 34.00 512.87 556.76 590.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 34.00 512.87 556.76 590.00 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 39.00 600.00 697.50 525.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 39.00 600.00 697.50 525.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 40.00 400.00 659.02 703.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 102.00 425.00 481.44 450.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 43.00 508.15 508.15 508.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 185.00 438.92 529.82 518.22 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 343.00 515.42 687.54 666.11 =============== 503-00048 Drilled Caisson (48 In) Lin Foot =============================================== FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 28.00 500.00 665.00 575.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 42.00 600.00 537.50 515.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 70.00 560.00 610.36 539.00 NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPL 04/05/18 21.00 650.00 491.67 455.00 STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 20.50 550.00 536.25 575.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 21.00 2000.00 1300.00 1300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 62.50 1070.80 615.95 778.28 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 32.00 700.00 1104.50 1500.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 259 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 503-00048 Drilled Caisson (48 In) Lin Foot =============================================== NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 21.00 525.00 617.92 605.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 88.00 558.94 558.94 558.94 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 63.00 700.00 575.50 563.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 81.00 500.00 667.37 575.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 42.00 465.00 505.50 525.00 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 22.00 800.00 960.25 710.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 349.00 585.51 708.08 657.90 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 21.00 830.00 775.00 1050.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 283.00 450.00 725.32 737.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 21.00 530.00 564.63 525.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 173.00 549.37 549.37 549.37 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 498.00 503.92 697.21 676.08 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 979.50 573.17 692.23 666.32 =============== 503-00054 Drilled Caisson (54 In) Lin Foot =============================================== NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 88.00 950.00 2385.11 1470.22 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 63.00 750.00 547.50 570.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 151.00 866.56 1618.43 1094.63 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 21.00 697.50 713.67 740.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 21.00 697.50 713.67 740.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 21.00 600.00 704.08 680.00 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 21.00 900.00 715.50 617.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 42.00 750.00 706.94 648.50 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 56.00 500.00 833.90 850.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 260 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 503-00054 Drilled Caisson (54 In) Lin Foot =============================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 214.00 618.57 618.57 618.57 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 270.00 593.98 728.69 666.57 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 484.00 697.05 983.19 801.74 =============== 503-00060 Drilled Caisson (60 In) Lin Foot =============================================== ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 84.00 850.00 1379.83 1200.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 84.00 850.00 1379.83 1200.00 FBR060A-022 SH 60 over the South Platte 07/12/18 642.00 635.00 972.66 825.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 364.00 700.00 1128.62 930.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,006.00 658.52 1026.00 862.99 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,090.00 673.28 1038.25 888.96 =============== 503-00072 Drilled Caisson (72 In) Lin Foot =============================================== BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 217.00 950.00 1004.06 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 217.00 950.00 1004.06 1000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 217.00 950.00 1004.06 1000.00 =============== 503-00310 CSL Testing Each =================================================== ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 1.00 2500.00 4022.67 3500.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 2500.00 4022.67 3500.00 FBR060A-022 SH 60 over the South Platte 07/12/18 12.00 1800.00 2605.29 1250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.00 1800.00 2605.29 1250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13.00 1853.85 2652.85 1423.08 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 261 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 503-01060 M pile (6 In) Lin Foot =============================================== NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 264.00 500.00 821.00 610.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 264.00 500.00 821.00 610.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 264.00 500.00 821.00 610.00 =============== 504-03411 Retaining Wall (Boulder) Sq Foot ================================================ FBR0705-087 I-70: EMERGENCY BRIDGE G-25-K 05/16/18 3,500.00 27.00 27.00 27.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,500.00 27.00 27.00 27.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,500.00 27.00 27.00 27.00 =============== 504-04420 Precast Panel Facing Sq Foot ================================================ C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 15,463.00 18.20 18.20 18.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 15,463.00 18.20 18.20 18.20 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 21,698.00 38.14 38.14 38.14 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 21,698.00 38.14 38.14 38.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 37,161.00 29.84 29.84 29.84 =============== 504-04425 Architectural Precast Concrete Panel Sq Foot ================================================ NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 57,780.00 32.42 32.42 32.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 57,780.00 32.42 32.42 32.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 57,780.00 32.42 32.42 32.42 =============== 504-04430 Reinforced Concrete Facing Sq Foot ================================================ NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 3,712.00 30.00 34.80 38.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,712.00 30.00 34.80 38.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,712.00 30.00 34.80 38.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 262 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 504-06406 Soil Nail Lin Foot =============================================== ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 1,860.00 76.16 87.00 87.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,860.00 76.16 87.00 87.00 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 180.00 350.00 218.50 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 180.00 350.00 218.50 50.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1,581.00 38.97 38.97 38.97 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,581.00 38.97 38.97 38.97 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,621.00 73.53 91.50 64.19 =============== 504-06410 Verification Testing Each =================================================== ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 2.00 7556.70 8411.00 8411.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 7556.70 8411.00 8411.00 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 2.00 500.00 6023.97 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 500.00 6023.97 2500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 4028.35 6501.38 5455.50 =============== 504-08255 Masonry Landscape Wall (Dry Stack) Sq Foot ================================================ NH0242-071 US 24 & 31ST STREET and US24 05/03/18 276.00 30.00 127.79 94.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 276.00 30.00 127.79 94.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 276.00 30.00 127.79 94.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 263 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 506-00000 Riprap Cubic Yard ============================================= FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 5.00 250.00 216.31 168.98 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 4.00 250.00 282.17 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9.00 250.00 240.26 316.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 250.00 240.26 316.10 =============== 506-00010 Riprap (Special) Cubic Yard ============================================= SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 18.00 150.00 176.67 90.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 182.00 350.00 511.43 525.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 88.00 135.00 132.48 88.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 288.00 271.81 382.77 364.28 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 288.00 271.81 382.77 364.28 =============== 506-00012 Riprap (Special) Each =================================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 50.00 1470.00 1470.00 1470.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 50.00 1470.00 1470.00 1470.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 1470.00 1470.00 1470.00 =============== 506-00030 Grouted Riprap Cubic Yard ============================================= ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 243.00 200.00 297.45 150.00 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 38.00 200.00 360.98 260.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 281.00 200.00 301.19 164.88 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 281.00 200.00 301.19 164.88 =============== 506-00206 Riprap (6 In) Cubic Yard ============================================= SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 37.00 150.00 101.00 93.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 264 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 506-00206 Riprap (6 In) Cubic Yard ============================================= ER1151-033 PR SH 115-MP 34.7 01/25/18 33.00 100.00 220.01 300.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 70.00 126.43 165.64 190.59 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 5.00 115.00 122.50 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 115.00 122.50 65.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 720.00 60.00 103.67 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 720.00 60.00 103.67 90.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 8,443.00 110.25 110.25 110.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8,443.00 110.25 110.25 110.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,238.00 106.46 108.84 109.26 =============== 506-00209 Riprap (9 In) Cubic Yard ============================================= STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 30.00 130.00 141.00 162.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 30.00 130.00 141.00 162.00 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 4.00 200.00 184.25 162.37 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 200.00 184.25 162.37 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 3.00 150.00 225.58 410.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 265 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 506-00209 Riprap (9 In) Cubic Yard ============================================= STMR200-246 R2–2018 CRITICAL CULVERTS REP 09/20/18 15.00 200.00 230.00 230.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 18.00 191.67 226.96 260.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 10.00 250.00 276.25 210.00 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 2.00 200.00 1033.64 879.57 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 2.00 250.00 649.00 600.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 15.00 200.00 140.30 104.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 29.00 220.69 248.72 228.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 81.00 179.63 204.11 207.51 =============== 506-00210 Riprap (9 In) Ton ==================================================== ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 1,564.00 80.00 89.07 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,564.00 80.00 89.07 60.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,564.00 80.00 89.07 60.00 =============== 506-00212 Riprap (12 In) Cubic Yard ============================================= NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 10.00 150.00 400.00 400.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 2,066.00 90.00 93.60 95.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 498.00 125.00 95.81 94.00 CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 349.00 182.17 200.00 200.00 ER144A-002 SH 144 East and West of Goodr 03/08/18 30.00 175.00 143.38 93.40 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 378.00 75.00 165.85 197.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,331.00 104.13 109.05 118.33 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 254.00 100.00 83.33 65.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 31.00 125.00 151.18 156.05 ER055A-001 PR SH 55 FLOOD REPAIR 2015 06/28/18 718.00 95.00 136.67 115.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,003.00 97.19 132.18 103.61 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 266 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 506-00212 Riprap (12 In) Cubic Yard ============================================= FBR060A-022 SH 60 over the South Platte 07/12/18 12.00 120.00 150.79 125.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 17.00 140.00 225.49 140.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 50.00 150.00 146.97 55.90 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 198.00 129.15 129.15 129.15 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 38.00 100.00 302.28 210.00 STA052A-040 SH 52: Antelope Creek 08/23/18 171.00 100.00 138.83 141.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 16.00 150.00 217.50 210.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 1,565.00 150.00 103.70 98.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,067.00 142.69 109.27 106.95 BR1131-006 SH 113 AT MP 11.5 10/11/18 278.00 105.00 153.09 131.72 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 35.00 130.00 128.59 135.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 715.00 140.72 140.73 140.73 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 23.00 100.00 208.00 166.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 89.00 150.00 139.12 88.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 17.00 150.00 271.89 140.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 100.00 75.00 159.57 291.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 3.00 300.00 267.80 251.21 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 282.00 129.15 129.15 129.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,542.00 128.00 151.15 144.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,943.00 117.92 117.18 118.52 =============== 506-00213 Riprap (12 Inch)(Install Only) Cubic Yard ============================================= ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 1,623.00 50.60 52.00 52.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,623.00 50.60 52.00 52.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,623.00 50.60 52.00 52.00 =============== 506-00218 Riprap (18 In) Cubic Yard ============================================= CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 269.00 165.00 210.00 210.00 ER1151-033 PR SH 115-MP 34.7 01/25/18 1.30 200.00 1904.67 6500.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 267 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 506-00218 Riprap (18 In) Cubic Yard ============================================= ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 477.00 105.00 125.73 120.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 747.30 126.76 133.53 163.50 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 161.00 95.00 93.40 62.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 161.00 95.00 93.40 62.00 FBR060A-022 SH 60 over the South Platte 07/12/18 489.00 110.00 106.96 100.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 1,420.00 110.00 91.31 100.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 1,250.00 80.00 115.41 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,159.00 98.13 101.81 100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,067.30 103.27 105.46 110.16 =============== 506-00224 Riprap (24 In) Cubic Yard ============================================= CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 2,681.00 201.37 220.00 220.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,681.00 201.37 220.00 220.00 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 2,218.00 130.00 101.67 80.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 39.00 140.00 128.89 190.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,257.00 130.17 102.59 81.90 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 130.00 150.00 183.63 155.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 130.00 150.00 183.63 155.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 1,746.00 140.00 132.21 175.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 268 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 506-00224 Riprap (24 In) Cubic Yard ============================================= STA086A-051 SH 86; WEST OF I-70 11/29/18 321.00 180.00 183.22 120.00 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 363.00 125.00 126.14 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,430.00 143.04 137.75 155.04 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,498.00 160.15 138.54 156.25 =============== 506-00227 Riprap (24 In) (Install Only) Cubic Yard ============================================= ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 1,976.00 49.94 58.00 58.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,976.00 49.94 58.00 58.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,976.00 49.94 58.00 58.00 =============== 506-00230 Riprap (30 In) Cubic Yard ============================================= NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 850.00 185.00 229.00 185.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 850.00 185.00 229.00 185.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 850.00 185.00 229.00 185.00 =============== 506-00236 Riprap (36 In) Cubic Yard ============================================= FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 700.00 220.00 154.27 160.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 700.00 220.00 154.27 160.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 700.00 220.00 154.27 160.00 =============== 506-00237 Riprap (36 In) (Spec) Cubic Yard ============================================= STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 126.00 250.00 346.27 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 126.00 250.00 346.27 400.00 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 1,402.00 265.00 195.67 190.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,402.00 265.00 195.67 190.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,528.00 263.76 224.78 207.32 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 269 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 506-00406 Soil Riprap (6 In) Cubic Yard ============================================= ER144A-002 SH 144 East and West of Goodr 03/08/18 2,516.00 90.00 78.53 52.27 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,516.00 90.00 78.53 52.27 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,516.00 90.00 78.53 52.27 =============== 506-00409 Soil Riprap (9 In) Cubic Yard ============================================= ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 2,244.00 85.00 90.31 80.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,244.00 85.00 90.31 80.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 30.00 155.00 108.70 108.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 30.00 155.00 108.70 108.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 45.00 159.90 159.93 159.93 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 45.00 159.90 159.93 159.93 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,319.00 87.36 90.78 81.91 =============== 506-00412 Soil Riprap (12 In) Cubic Yard ============================================= ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 951.00 185.00 87.50 83.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 2,095.00 85.00 93.06 90.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,046.00 116.22 91.05 87.81 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 851.00 80.00 103.37 79.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 851.00 80.00 103.37 79.35 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 270 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 506-00412 Soil Riprap (12 In) Cubic Yard ============================================= C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 66.00 157.50 157.50 157.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 66.00 157.50 157.50 157.50 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 1,200.00 110.00 104.55 93.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 4,035.00 156.45 156.45 156.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5,235.00 145.80 121.39 141.91 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,198.00 130.00 101.34 118.32 =============== 506-00418 Soil Riprap (18 In) Cubic Yard ============================================= ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 347.00 90.00 99.46 90.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 189.00 100.00 166.70 165.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 536.00 93.53 123.17 116.45 ER052A-039 SH 170 11/15/18 170.00 115.00 102.35 88.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 170.00 115.00 102.35 88.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 706.00 98.70 119.72 109.60 =============== 506-00424 Soil Riprap (24 In) Cubic Yard ============================================= NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 4,203.00 100.00 100.67 105.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4,203.00 100.00 100.67 105.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 905.00 120.00 124.83 190.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 271 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 506-00424 Soil Riprap (24 In) Cubic Yard ============================================= STA086A-051 SH 86; WEST OF I-70 11/29/18 1,251.00 145.00 145.34 86.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 600.00 171.15 171.15 171.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,756.00 142.48 138.26 138.69 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,959.00 116.82 120.13 118.34 =============== 506-00512 Riprap (12 In)(Furnish) Ton ==================================================== ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 3,360.00 54.45 43.00 43.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,360.00 54.45 43.00 43.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,360.00 54.45 43.00 43.00 =============== 506-00524 Riprap (24 In)(Furnish) Ton ==================================================== ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 4,090.00 74.14 59.00 59.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,090.00 74.14 59.00 59.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,090.00 74.14 59.00 59.00 =============== 506-01020 Geogrid Reinforce Sq Yard ================================================ STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 1,000.00 5.00 4.21 2.25 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 5,062.00 5.50 6.54 2.65 NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 562.00 11.00 8.60 3.71 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6,624.00 5.89 6.36 2.68 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 2,000.00 4.00 4.96 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,000.00 4.00 4.96 3.00 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 200.00 8.60 10.00 5.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 272 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 506-01020 Geogrid Reinforce Sq Yard ================================================ FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 68,100.00 2.40 2.35 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 68,300.00 2.42 2.37 2.01 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 76,924.00 2.76 2.87 2.09 =============== 507-00000 Conc S and D Pave Cubic Yard ============================================= BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 209.00 250.00 537.96 576.87 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 209.00 250.00 537.96 576.87 NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 1.00 750.00 450.00 450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 750.00 450.00 450.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 19.00 675.00 915.57 750.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 67.00 1040.95 769.38 769.38 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 32.00 840.00 840.00 840.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 118.00 927.53 862.93 785.41 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 328.00 495.27 582.36 651.51 =============== 507-00100 Conc S and D Pave (Reinf) Cubic Yard ============================================= FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 50.00 500.00 894.43 588.22 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 50.00 500.00 894.43 588.22 SHE0701-245 I-70 MEDIAN CABLE RAIL INSTAL 07/12/18 184.00 250.00 426.25 426.25 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 232.00 450.00 677.87 425.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 416.00 361.54 659.38 425.55 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 16.00 600.00 1278.37 1660.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 273 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 507-00100 Conc S and D Pave (Reinf) Cubic Yard ============================================= NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 70.00 600.00 917.50 585.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 2.00 1250.00 1308.08 2238.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 11.00 700.00 1439.10 1500.00 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 12.00 712.50 1327.36 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 111.00 633.78 1166.91 905.28 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 577.00 425.91 737.55 531.94 =============== 507-00300 Gr Rubble S and D Pave Cubic Yard ============================================= FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 48.00 300.00 603.75 325.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 48.00 300.00 603.75 325.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 48.00 300.00 603.75 325.00 =============== 507-00350 Gr Riprap S and D Pave Cubic Yard ============================================= ER1151-033 PR SH 115-MP 34.7 01/25/18 30.00 200.00 2076.96 1750.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 30.00 200.00 2076.96 1750.00 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 1,055.00 320.00 361.67 330.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,055.00 320.00 361.67 330.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,085.00 316.68 424.33 369.26 =============== 507-00400 Bitum S and D Pave (Asph) Ton ==================================================== NHPP0702-366 I-70 Avon to Vail 11/08/18 30.00 250.00 340.12 500.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 25.00 350.00 345.21 168.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 55.00 295.45 342.95 349.09 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 55.00 295.45 342.95 349.09 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 274 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 507-00725 S and D Paving (Special) Lin Foot =============================================== STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 1,485.00 20.00 32.88 37.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,485.00 20.00 32.88 37.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,485.00 20.00 32.88 37.50 =============== 509-00000 Str Steel Pound ================================================== NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 4,000.00 10.00 14.07 13.20 ER055A-001 PR SH 55 FLOOD REPAIR 2015 06/28/18 5,791.00 5.00 8.14 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 9,791.00 7.04 9.08 11.31 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 74.00 4.00 19.66 15.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 100,100.00 2.50 3.33 2.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 100,174.00 2.50 3.34 2.71 NHPP0702-366 I-70 Avon to Vail 11/08/18 3,810.00 10.00 16.91 16.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,810.00 10.00 16.91 16.90 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 113,775.00 3.14 4.15 3.92 =============== 509-00001 Str Steel (Galv) Pound ================================================== NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 4,540.00 4.00 8.63 8.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,540.00 4.00 8.63 8.25 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 46,672.00 1.50 2.81 2.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 46,672.00 1.50 2.81 2.75 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 275 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 509-00001 Str Steel (Galv) Pound ================================================== STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 1,929.00 4.00 10.00 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,929.00 4.00 10.00 5.00 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 194.00 20.00 7.05 6.85 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 552.00 10.00 8.79 10.08 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 2,007.00 10.00 11.60 10.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 216.00 30.00 9.51 4.55 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 3,083.00 3.92 16.05 12.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6,052.00 7.94 13.67 10.99 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 59,193.00 2.43 4.62 4.09 =============== 509-00003 Str Steel (Install Only) Pound ================================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 33,400.00 1.86 2.06 2.06 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 33,400.00 1.86 2.06 2.06 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 33,400.00 1.86 2.06 2.06 =============== 509-08020 Alter-Erect Str Steel Pound ================================================== FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 2,963.00 430.00 84.78 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,963.00 430.00 84.78 55.00 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 1,451.00 3.00 37.06 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,451.00 3.00 37.06 35.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,414.00 289.63 69.10 48.43 =============== 509-08100 Provide Temporary Support LUMP SUM =============================================== ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 1.00 41400.00 66786.81 15000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 276 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 509-08100 Provide Temporary Support LUMP SUM =============================================== STA0342-060 US 34D OVERLAY AND BRIDGE WOR -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 41400.00 66786.81 15000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 41400.00 66786.81 15000.00 =============== 509-08102 Provide Temporary Support Each =================================================== BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 2.00 2500.00 6699.62 4906.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 2500.00 6699.62 4906.78 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 3.00 40000.00 72689.01 65000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 40000.00 72689.01 65000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 25000.00 40832.06 40962.71 =============== 509-08121 Temp Bridge Deck Lin Foot =============================================== IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 135.00 1000.00 555.71 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 135.00 1000.00 555.71 60.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 135.00 1000.00 555.71 60.00 =============== 509-08201 Retrofit/Repair Type I Each =================================================== FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 32.00 5800.00 1104.58 725.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 2.00 8000.00 4496.86 1413.82 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 5.00 6000.00 1995.09 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 39.00 5938.46 1455.10 923.79 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 39.00 5938.46 1455.10 923.79 =============== 509-08202 Retrofit/Repair Ty II Each =================================================== FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 16.00 3250.00 578.48 250.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 277 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 509-08202 Retrofit/Repair Ty II Each =================================================== FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 4.00 5000.00 2066.94 884.97 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 5.00 3000.00 1430.03 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 25.00 3480.00 1051.90 701.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25.00 3480.00 1051.90 701.60 =============== 509-08203 Retrofit/Repair Type III Each =================================================== FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 1.00 1000.00 5560.85 2920.21 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 100.00 2000.00 698.88 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 101.00 1990.10 766.00 375.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 101.00 1990.10 766.00 375.45 =============== 509-90000 Paint Existing Str(S) LUMP SUM =============================================== FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 1.00 7500.00 10275.46 6349.46 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 1.00 95000.00 56623.08 65000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 51250.00 29586.97 35674.73 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 1.00 1000.00 14420.15 5500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1000.00 14420.15 5500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 34500.00 25126.14 25616.49 =============== 509-90001 Paint Existing Structure Each =================================================== FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 12.00 1000.00 1663.21 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12.00 1000.00 1663.21 500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 1000.00 1663.21 500.00 =============== 509-90003 Paint Structural Steel LUMP SUM =============================================== FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 1.00 7500.00 6100.28 3865.88 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 7500.00 6100.28 3865.88 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 7500.00 6100.28 3865.88 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 278 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 512-00101 Bearing Device (Type I) Each =================================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 8.00 1262.80 1009.38 1009.38 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8.00 1262.80 1009.38 1009.38 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 1262.80 1009.38 1009.38 =============== 512-00102 Bearing Device (Type II) Each =================================================== NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 23.00 2113.00 3536.64 2250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 23.00 2113.00 3536.64 2250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 23.00 2113.00 3536.64 2250.00 =============== 512-00103 Bearing Device (Type III) Each =================================================== NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 8.00 5000.00 6886.78 7000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8.00 5000.00 6886.78 7000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 5000.00 6886.78 7000.00 =============== 512-00120 Bearing Repair Corbel Each =================================================== ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 1.00 7762.50 13709.50 6500.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 7762.50 13709.50 6500.00 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 5.00 4312.00 6177.07 6250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 4312.00 6177.07 6250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 4887.08 7432.47 6291.67 =============== 513-00600 Bridge Drain Each =================================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 11.00 4926.29 4926.29 4926.29 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 11.00 4926.29 4926.29 4926.29 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 4926.29 4926.29 4926.29 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 279 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 513-00606 Bridge Drain (6 In) Each =================================================== FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 4.00 400.00 3600.47 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 400.00 3600.47 2500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 400.00 3600.47 2500.00 =============== 513-00690 Bridge Drain (Spec) Each =================================================== BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 5.00 3652.00 5250.47 2193.66 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 3652.00 5250.47 2193.66 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 4.00 2500.00 3235.16 2700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 2500.00 3235.16 2700.00 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 2.00 1200.00 10420.34 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 1200.00 10420.34 2500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 2787.27 4835.02 2433.48 =============== 514-00000 Pipe Railing Lin Foot =============================================== ER052A-039 SH 170 11/15/18 107.00 155.00 227.44 275.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 8.00 210.00 341.51 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 115.00 158.83 233.87 266.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 115.00 158.83 233.87 266.30 =============== 514-00200 Pedestrian Railing (Steel) Lin Foot =============================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1,282.00 206.60 220.68 220.68 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,282.00 206.60 220.68 220.68 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,282.00 206.60 220.68 220.68 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 280 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 514-00201 Ped Railing (Steel) (Spec) Lin Foot =============================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 108.00 240.62 221.37 221.37 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 108.00 240.62 221.37 221.37 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 108.00 240.62 221.37 221.37 =============== 514-02150 Inst Anchor Bolt Each =================================================== NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 146.00 10.00 165.91 70.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 146.00 10.00 165.91 70.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 146.00 10.00 165.91 70.00 =============== 515-00120 Waterproofing (Membrane) Sq Yard ================================================ STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 4.00 250.00 625.00 600.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 2,730.00 18.00 19.02 15.50 STA0342-060 US 34D OVERLAY AND BRIDGE WOR NHPP0702-373 I-70 GWC Longitudinal Joint R 01/11/18 317.00 20.00 27.50 30.00 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 2,571.00 20.00 18.91 17.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 27,318.00 11.00 19.66 19.15 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 2,979.00 20.00 19.97 17.54 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 156.00 20.00 31.26 31.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 204.00 25.00 28.48 40.00 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 3,557.00 20.00 17.27 19.82 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 39,836.00 13.74 19.64 19.00 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 678.00 45.00 26.19 27.86 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 186.00 40.00 41.09 48.40 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 1,809.00 18.00 19.77 21.92 FBR0705-087 I-70: EMERGENCY BRIDGE G-25-K 05/16/18 1,279.00 21.00 21.00 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,952.00 24.64 24.35 23.89 FBR060A-022 SH 60 over the South Platte 07/12/18 3,689.00 18.00 17.14 15.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 281 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 515-00120 Waterproofing (Membrane) Sq Yard ================================================ BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 3,066.00 25.00 19.45 16.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 1,302.00 20.00 20.96 22.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 672.00 25.00 23.30 16.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 3,095.00 15.00 16.45 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 11,824.00 19.65 17.95 16.09 BR1131-006 SH 113 AT MP 11.5 10/11/18 317.00 22.00 33.10 42.22 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 3,444.00 20.00 18.54 19.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 46.00 25.00 112.18 35.40 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 2,370.00 17.42 15.75 15.75 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 588.00 20.00 22.50 30.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 833.00 25.00 22.05 21.50 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 165.00 18.00 28.18 37.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 8,076.00 15.91 15.91 15.91 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 15,839.00 17.83 20.50 18.18 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 71,451.00 16.23 19.44 18.61 =============== 515-00122 Waterproofing (Membrane)(Spec) Sq Yard ================================================ NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 2,426.00 20.00 14.50 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,426.00 20.00 14.50 14.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,426.00 20.00 14.50 14.00 =============== 515-00200 Waterproofing (Duct Floor) Sq Yard ================================================ NHPP0703-436 EJMT PLENUM WATERPROOFING MEM 06/28/18 3,962.00 52.00 83.25 82.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,962.00 52.00 83.25 82.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,962.00 52.00 83.25 82.50 =============== 515-00300 Waterproof Coating Sq Yard ================================================ NHPP0703-436 EJMT PLENUM WATERPROOFING MEM 06/28/18 2,644.00 29.00 55.75 24.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,644.00 29.00 55.75 24.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,644.00 29.00 55.75 24.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 282 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 515-00400 Concrete Sealer Sq Yard ================================================ ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 87.00 17.20 75.28 40.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 740.00 19.73 20.00 20.00 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 497.00 15.00 20.27 19.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 578.00 15.00 16.10 14.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,902.00 16.94 21.16 18.86 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 3,924.00 16.39 16.39 16.39 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,924.00 16.39 16.39 16.39 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 216.00 15.00 17.82 17.85 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 4,271.00 13.02 13.02 13.02 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,487.00 13.12 13.65 13.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10,313.00 15.07 17.80 15.48 =============== 518-00000 Brdg Compress Joint Sealer Lin Foot =============================================== ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 275.00 90.00 108.30 20.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 275.00 90.00 108.30 20.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 280.00 90.00 41.29 41.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 170.00 100.00 140.48 141.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 450.00 93.78 72.33 79.06 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 725.00 92.34 88.79 56.66 =============== 518-00106 Waterstop (6 In) Lin Foot =============================================== ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 38.00 75.00 16.49 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 38.00 75.00 16.49 14.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 38.00 75.00 16.49 14.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 283 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 518-01001 Br Expan Joint (Asphaultic Plug) Lin Foot =============================================== BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 584.00 150.00 216.42 154.09 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 584.00 150.00 216.42 154.09 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 56.00 200.00 183.04 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 56.00 200.00 183.04 140.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 154.00 200.00 139.86 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 154.00 200.00 139.86 140.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 794.00 163.22 205.33 150.36 =============== 518-01002 Br Expan Device (0-2 In) Lin Foot =============================================== FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 65.00 190.00 197.98 52.67 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 65.00 190.00 197.98 52.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 65.00 190.00 197.98 52.67 =============== 518-01004 Br Expan Device (0-4 In) Lin Foot =============================================== FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 133.00 150.00 298.90 300.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 1,362.00 180.00 275.53 182.70 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 118.00 475.00 310.59 324.13 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 84.00 350.00 349.68 295.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,697.00 206.58 282.14 207.29 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 120.00 340.00 244.40 203.93 FBR0705-087 I-70: EMERGENCY BRIDGE G-25-K 05/16/18 82.00 250.00 250.00 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 202.00 303.47 244.76 222.63 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 284 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 518-01004 Br Expan Device (0-4 In) Lin Foot =============================================== FBR060A-022 SH 60 over the South Platte 07/12/18 80.00 250.00 258.52 200.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 196.00 250.00 215.14 225.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 80.00 250.00 239.80 210.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 356.00 250.00 231.81 216.01 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 257.00 340.00 385.33 250.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 88.00 350.00 337.23 277.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 589.00 245.61 245.61 245.61 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 934.00 281.42 344.83 249.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,189.00 239.48 278.36 221.68 =============== 518-01050 Br Expan Device (Special) Lin Foot =============================================== STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 28.00 300.00 604.63 700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 28.00 300.00 604.63 700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 28.00 300.00 604.63 700.00 =============== 518-01060 Br Expan Device (Gland) (0-4 In) Lin Foot =============================================== STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 40.00 140.00 22.16 26.00 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 92.00 100.00 29.88 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 132.00 112.12 27.54 39.24 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 132.00 112.12 27.54 39.24 =============== 518-02030 Polyester Conc End Dam Cubic Foot ============================================= FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 177.00 200.00 228.19 140.37 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 177.00 200.00 228.19 140.37 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 177.00 200.00 228.19 140.37 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 285 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 518-03000 Saw and Seal Br Joint Lin Foot =============================================== STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 185.00 30.00 22.25 17.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 374.00 40.00 8.64 8.75 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 79.00 26.60 74.41 30.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 1,946.00 30.10 33.23 22.01 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 118.00 25.00 29.04 14.84 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 103.00 50.00 30.76 35.00 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 463.00 21.00 23.40 21.21 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,268.00 30.30 30.75 20.44 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 304.00 26.00 26.53 15.70 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 532.00 23.00 22.87 48.22 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 836.00 24.09 24.20 36.39 NHPP0702-366 I-70 Avon to Vail 11/08/18 859.00 20.00 5.58 5.40 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 228.00 21.00 21.32 21.32 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 1,045.00 25.00 24.07 15.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1,778.00 27.01 27.01 27.01 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,910.00 24.58 17.95 18.72 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,014.00 26.86 26.21 21.27 =============== 518-03100 Rapid Cure Silicone Jt Seal Lin Foot =============================================== NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 250.00 42.00 29.47 29.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 250.00 42.00 29.47 29.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 250.00 42.00 29.47 29.40 =============== 519-01000 Epoxy Resin (Injection) Lin Foot =============================================== IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 125.00 100.00 199.70 175.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 125.00 100.00 199.70 175.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 125.00 100.00 199.70 175.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 286 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 519-01100 Epoxy Mortar (Injection) Lin Foot =============================================== NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 160.00 350.00 59.04 85.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 160.00 350.00 59.04 85.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 160.00 350.00 59.04 85.00 =============== 519-03035 Place Thin Bond Overlay (Poly Conc) Sq Yard ================================================ FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 2,624.00 40.00 34.76 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,624.00 40.00 34.76 30.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 1,036.00 40.00 71.93 71.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,036.00 40.00 71.93 71.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,660.00 40.00 41.88 41.72 =============== 519-03055 Furnish Thin Bond Overlay (Poly Conc) Cubic Foot ============================================= FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 1,803.00 120.00 108.84 115.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,803.00 120.00 108.84 115.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 876.00 105.00 137.00 136.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 876.00 105.00 137.00 136.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,679.00 115.10 115.20 122.03 =============== 601-01000 Conc CL B Cubic Yard ============================================= STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 12.00 1500.00 1375.15 1500.00 ER144A-002 SH 144 East and West of Goodr 03/08/18 50.00 1100.00 1071.92 800.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 287 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-01000 Conc CL B Cubic Yard ============================================= ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 51.20 967.67 1240.00 1240.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 113.20 1082.55 1120.76 1073.22 ER055A-001 PR SH 55 FLOOD REPAIR 2015 06/28/18 70.00 700.00 658.92 650.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 70.00 700.00 658.92 650.00 FBR060A-022 SH 60 over the South Platte 07/12/18 7.20 900.00 1033.91 1500.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 50.00 1260.00 1260.00 1260.00 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 2.00 750.00 734.00 803.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 59.20 1198.99 1105.88 1273.75 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 11.00 1100.00 1875.56 1456.68 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 14.00 700.00 1136.80 525.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 21.00 1000.00 1378.73 1100.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 4.00 1000.00 1225.31 599.49 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 89.00 1239.00 1239.00 1239.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 139.00 1130.73 1320.66 1144.91 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 381.40 1047.97 959.96 1052.80 =============== 601-01010 Conc CL BZ Cubic Yard ============================================= NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 7.00 600.00 1496.83 1900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 7.00 600.00 1496.83 1900.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 600.00 1496.83 1900.00 =============== 601-01025 Conc CL B (Misc) Cubic Yard ============================================= SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 48.00 500.00 748.00 894.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 48.00 500.00 748.00 894.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 288 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-01025 Conc CL B (Misc) Cubic Yard ============================================= ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 54.10 1250.00 1498.40 1406.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 54.10 1250.00 1498.40 1406.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 102.10 897.40 1291.67 1165.29 =============== 601-01050 Conc CL B (Wall) Cubic Yard ============================================= NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 28.00 1060.00 1254.89 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 28.00 1060.00 1254.89 1500.00 STA052A-040 SH 52: Antelope Creek 08/23/18 32.00 1450.00 1340.00 1300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 32.00 1450.00 1340.00 1300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 60.00 1268.00 1308.64 1393.33 =============== 601-03000 Conc CL D Cubic Yard ============================================= STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 1.00 1000.00 4792.50 4400.00 C0703-440 AVALANCHE CONTROL SYSTEM: EJM 02/01/18 21.00 3500.00 7902.10 1713.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 70.00 850.00 640.00 580.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 92.00 1456.52 3375.93 880.14 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 80.00 950.00 551.67 480.00 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 10.00 1000.00 2819.65 4500.00 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 15.00 700.00 541.67 725.00 NHPP0761-230 I-76 AND COUNTY ROAD 22 AT FO 06/14/18 95.00 850.00 1869.00 1250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 200.00 886.25 1491.50 1065.13 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 56.00 1000.00 1290.85 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 56.00 1000.00 1290.85 1000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 289 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-03000 Conc CL D Cubic Yard ============================================= ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 104.00 750.00 665.00 650.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 104.00 750.00 665.00 650.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 452.00 985.07 1377.95 923.89 =============== 601-03027 Conc CL D (Spec) Cubic Yard ============================================= STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 10.00 950.00 1094.60 980.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 950.00 1094.60 980.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 950.00 1094.60 980.00 =============== 601-03030 Conc CL D (Box) Cubic Yard ============================================= NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 48.00 800.00 1137.50 1000.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 181.00 570.00 1014.68 600.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 321.00 500.00 747.43 740.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 550.00 549.22 820.97 716.62 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 144.00 490.00 751.11 450.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 62.00 1600.00 1306.18 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 206.00 824.08 977.52 916.50 FBR060A-022 SH 60 over the South Platte 07/12/18 157.00 625.00 598.46 600.00 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 14.00 1650.00 1798.29 1070.00 M850-027 US24E MANITOU AVE. AT RUXTON 08/28/18 85.00 4100.00 2255.63 1420.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 256.00 1834.86 875.05 897.97 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 71.00 900.00 1002.20 909.59 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 290 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-03030 Conc CL D (Box) Cubic Yard ============================================= STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 29.00 800.00 1063.20 1000.00 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 467.00 700.00 837.14 750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 567.00 730.16 868.92 782.77 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,579.00 858.49 863.79 795.85 =============== 601-03040 Conc CL D (Bridge) Cubic Yard ============================================= STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 6.00 2000.00 7156.63 7325.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 58.00 800.00 1487.75 950.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 404.00 1390.72 2750.00 2750.00 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 19.00 1200.00 1160.35 1250.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 14.00 1000.00 1543.59 1952.90 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 120.00 900.00 569.96 700.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 159.00 725.00 913.25 1020.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 780.00 1128.62 1250.21 1932.46 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 392.00 700.00 780.07 615.71 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 261.00 770.00 953.10 942.39 FBR0705-087 I-70: EMERGENCY BRIDGE G-25-K 05/16/18 550.00 900.00 900.00 900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,203.00 806.63 824.79 816.56 FBR060A-022 SH 60 over the South Platte 07/12/18 1,567.00 600.00 597.92 725.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 1,488.00 500.00 669.14 575.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 335.00 1500.00 1106.07 915.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 1,160.00 600.00 636.18 650.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,550.00 633.56 654.07 670.81 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 119.00 1000.00 955.00 1200.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1,108.00 944.78 1009.22 1009.22 STA086A-051 SH 86; WEST OF I-70 11/29/18 10.00 1350.00 1842.46 2000.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 16.00 980.00 1114.91 1200.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 291 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-03040 Conc CL D (Bridge) Cubic Yard ============================================= NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 3,875.00 719.60 719.60 719.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5,128.00 776.80 819.52 797.32 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,661.00 747.52 710.72 825.87 =============== 601-03041 Conc CL D (Bridge) (Spec) Cubic Yard ============================================= STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 72.00 1400.00 2294.91 1800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 72.00 1400.00 2294.91 1800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 72.00 1400.00 2294.91 1800.00 =============== 601-03050 Conc CL D (Wall) Cubic Yard ============================================= ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 63.00 800.00 842.26 850.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 160.00 850.00 1251.13 1100.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 223.00 835.87 1116.26 1029.37 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 977.00 562.36 562.36 562.36 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 8.00 1650.00 2195.22 995.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 6.00 1300.00 1030.27 730.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 991.00 575.61 637.50 566.87 BR1131-006 SH 113 AT MP 11.5 10/11/18 71.00 750.00 1145.02 1000.00 ER052A-039 SH 170 11/15/18 82.00 1200.00 1011.81 1030.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 46.00 1754.75 1274.96 1274.96 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 328.00 525.00 749.13 530.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 3,425.00 564.15 564.15 564.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,952.00 591.29 711.76 587.09 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,166.00 598.84 789.81 602.30 =============== 601-03052 Conc CL D (Wall) (C) Cubic Yard ============================================= FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 24.00 650.00 1055.00 1260.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 24.00 650.00 1055.00 1260.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 24.00 650.00 1055.00 1260.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 292 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-03057 Conc CL DR Cubic Yard ============================================= NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 8.00 2250.00 3413.33 4200.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 15.00 2750.00 2996.99 850.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 23.00 2576.09 3084.64 2015.22 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 23.00 2576.09 3084.64 2015.22 =============== 601-04000 Conc CL E Cubic Yard ============================================= MTCE0253-267 MTCE R4 FY19 I25 CONCRETE PAN 12/13/18 819.00 580.00 719.00 504.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 819.00 580.00 719.00 504.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 819.00 580.00 719.00 504.00 =============== 601-05035 Conc CL S35 Cubic Yard ============================================= FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 214.00 1200.00 1819.87 1090.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 214.00 1200.00 1819.87 1090.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 214.00 1200.00 1819.87 1090.00 =============== 601-05050 Conc CL S50 Cubic Yard ============================================= FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 44.00 1100.00 2045.89 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 44.00 1100.00 2045.89 1100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 44.00 1100.00 2045.89 1100.00 =============== 601-05900 Conc SC Cubic Yard ============================================= FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 4.00 1000.00 2103.44 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 1000.00 2103.44 3000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 1000.00 2103.44 3000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 293 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-06000 Latex Modified Concrete Placement Sq Yard ================================================ ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 2,764.00 15.00 67.84 56.60 STA0342-060 US 34D OVERLAY AND BRIDGE WOR -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,764.00 15.00 67.84 56.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,764.00 15.00 67.84 56.60 =============== 601-06002 Latex Modified Concrete Cubic Yard ============================================= ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 279.00 925.00 862.27 760.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 279.00 925.00 862.27 760.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 279.00 925.00 862.27 760.00 =============== 601-06100 Conc (Patching) Cubic Yard ============================================= STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 5.00 2000.00 2687.30 2625.00 ER1151-033 PR SH 115-MP 34.7 01/25/18 5.00 1500.00 492.91 600.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 290.00 900.00 785.65 440.00 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 66.00 2100.00 2248.78 2197.34 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 366.00 1139.62 927.57 788.93 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 9.00 2030.00 4229.54 5698.14 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 9.00 2030.00 4229.54 5698.14 STMR200-246 R2–2018 CRITICAL CULVERTS REP 09/20/18 0.33 5000.00 55000.00 55000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 0.33 5000.00 55000.00 55000.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 1.00 5000.00 6234.31 6315.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 294 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-06100 Conc (Patching) Cubic Yard ============================================= NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 53.00 2500.00 2525.50 1250.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 18.00 3000.00 1524.46 4000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 72.00 2659.72 2380.22 2007.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 447.33 1405.05 1190.35 1123.89 =============== 601-06102 Concrete (Patching) Cubic Foot ============================================= FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 629.00 95.00 150.62 50.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 648.00 95.00 111.35 83.38 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 972.00 80.00 83.60 42.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,249.00 88.52 110.44 56.16 STA086A-051 SH 86; WEST OF I-70 11/29/18 14.00 1500.00 824.87 750.00 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 131.00 100.00 274.09 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 145.00 235.17 336.70 433.79 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,394.00 97.40 123.03 79.03 =============== 601-06150 Conc (Patching) Sq Foot ================================================ FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 60.00 85.00 81.91 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 60.00 85.00 81.91 20.00 NHPP0703-436 EJMT PLENUM WATERPROOFING MEM 06/28/18 1,000.00 51.00 53.00 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,000.00 51.00 53.00 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,060.00 52.92 56.77 48.30 =============== 601-06165 Conc (Patching)(Fast Curing) Cubic Foot ============================================= NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 9.00 400.00 516.25 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9.00 400.00 516.25 400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 400.00 516.25 400.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 295 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-06300 Cement Grout Cubic Foot ============================================= FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 135.00 100.00 256.94 180.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 135.00 100.00 256.94 180.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 135.00 100.00 256.94 180.00 =============== 601-06402 Grout (Bridge) (UHPC) Cubic Foot ============================================= BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 127.00 278.00 613.91 915.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 127.00 278.00 613.91 915.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 127.00 278.00 613.91 915.00 =============== 601-13001 Str Conc Stain (Special) Sq Yard ================================================ CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 1,186.00 96.00 150.00 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,186.00 96.00 150.00 150.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,186.00 96.00 150.00 150.00 =============== 601-25736 Precast Deck Panel (3 In) (Install Only) Sq Yard ================================================ NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1,107.00 50.52 53.20 53.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,107.00 50.52 53.20 53.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,107.00 50.52 53.20 53.20 =============== 601-40100 Concrete Anchor Each =================================================== NHPP5502-088 US 550 RIVERSIDE SNOW SHED LI 01/25/18 444.00 9.43 35.79 27.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 444.00 9.43 35.79 27.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 444.00 9.43 35.79 27.50 =============== 601-40300 Struct Conc Coating Sq Yard ================================================ NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 450.00 12.00 18.00 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 450.00 12.00 18.00 18.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 296 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-40300 Struct Conc Coating Sq Yard ================================================ FBR0705-087 I-70: EMERGENCY BRIDGE G-25-K 05/16/18 1,121.00 15.00 15.00 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,121.00 15.00 15.00 15.00 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 57.00 30.00 62.97 67.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 57.00 30.00 62.97 67.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1,587.00 18.53 14.19 14.19 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 2.00 18.00 232.50 165.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,589.00 18.53 14.74 14.38 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,217.00 16.59 18.44 16.03 =============== 601-40301 Struct Conc Coating Sq Foot ================================================ NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 170,845.00 1.45 1.45 1.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 170,845.00 1.45 1.45 1.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 170,845.00 1.45 1.45 1.45 =============== 601-40302 Struct Conc Coating (Anti-Graf) Sq Foot ================================================ FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 655.00 2.50 4.06 2.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 655.00 2.50 4.06 2.75 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 126,162.00 1.34 1.34 1.34 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 126,162.00 1.34 1.34 1.34 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 126,817.00 1.35 1.40 1.35 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 297 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-40400 Struct Conc Stain Sq Yard ================================================ FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 2.00 9.00 221.25 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 9.00 221.25 20.00 NHPP0761-230 I-76 AND COUNTY ROAD 22 AT FO 06/14/18 387.00 35.00 30.52 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 387.00 35.00 30.52 65.00 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 25.00 20.00 75.65 102.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 687.00 20.00 24.48 44.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 376.00 20.00 20.79 3.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,088.00 20.00 24.67 31.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,477.00 23.92 26.93 40.12 =============== 601-40401 Struct Conc Stain Sq Foot ================================================ BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 28,031.00 3.00 2.04 1.44 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 28,031.00 3.00 2.04 1.44 ER052A-039 SH 170 11/15/18 841.00 1.50 6.74 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 841.00 1.50 6.74 7.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 28,872.00 2.96 2.14 1.60 =============== 601-51005 Galvanic Anodes Each =================================================== ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 2,850.00 35.00 23.39 25.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 845.00 55.00 33.16 20.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 298 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-51005 Galvanic Anodes Each =================================================== FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 910.00 55.00 33.43 28.38 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 1,295.00 55.00 27.03 20.00 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 2,664.00 25.00 22.51 26.53 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8,564.00 39.01 26.49 24.59 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 475.00 26.00 33.84 38.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 475.00 26.00 33.84 38.35 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 710.00 40.00 30.57 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 710.00 40.00 30.57 30.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 312.00 40.00 37.75 28.35 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 1,123.00 25.00 21.67 30.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 315.00 35.00 27.25 31.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 320.00 26.00 32.85 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,070.00 28.94 25.35 31.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,819.00 36.78 26.73 26.67 =============== 601-51007 Galvanic Anodes (Install Only) Each =================================================== NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 166.00 35.00 10.88 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 166.00 35.00 10.88 7.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 166.00 35.00 10.88 7.00 =============== 602-00000 Reinf Steel Pound ================================================== ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 15,658.00 1.10 1.65 0.85 STA0342-060 US 34D OVERLAY AND BRIDGE WOR COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 299 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 602-00000 Reinf Steel Pound ================================================== ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 37,885.00 0.85 1.26 0.90 CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 22,141.00 1.52 1.50 1.50 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 216.00 1.75 6.47 4.00 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 1,870.00 5.00 2.08 4.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 2,000.00 3.00 2.29 1.95 C0703-440 AVALANCHE CONTROL SYSTEM: EJM 02/01/18 1,779.00 8.00 11.20 3.75 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 4,295.00 3.00 1.76 3.00 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 4,433.00 2.00 2.07 1.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 90,277.00 1.49 1.55 1.30 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 3,475.00 1.20 3.47 4.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 6,776.00 2.00 2.53 1.98 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 1,475.00 1.00 1.98 2.15 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 475.00 1.10 2.22 1.21 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 3,600.00 1.25 5.67 3.50 ER055A-001 PR SH 55 FLOOD REPAIR 2015 06/28/18 6,701.00 1.50 1.66 1.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 22,502.00 1.52 2.42 2.46 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 8,012.00 0.91 0.91 0.91 STA052A-040 SH 52: Antelope Creek 08/23/18 2,250.00 2.00 2.91 6.25 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 3,647.00 1.00 2.65 2.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 126,160.00 1.00 1.05 1.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 140,069.00 1.01 1.08 1.11 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 380.00 2.00 3.62 4.20 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 10,993.00 1.50 1.75 1.23 ER052A-039 SH 170 11/15/18 13,070.00 1.50 1.55 1.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 26,790.00 1.17 1.26 1.26 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 5,841.00 2.00 2.19 2.65 STA086A-051 SH 86; WEST OF I-70 11/29/18 295.00 2.00 1.52 1.80 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 166.00 2.50 8.97 20.00 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 101,789.00 0.90 1.04 1.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 127,821.00 1.06 1.06 1.06 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 287,145.00 1.07 1.19 1.11 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 539,993.00 1.15 1.27 1.20 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 300 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 602-00010 Reinf Steel (Galv) Pound ================================================== FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 795.00 5.00 3.86 6.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 795.00 5.00 3.86 6.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 795.00 5.00 3.86 6.50 =============== 602-00020 Reinf Steel (Epoxy) Pound ================================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 200.00 2.00 6.75 7.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 1,200.00 2.00 5.08 5.25 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 3,017.00 2.00 2.28 1.25 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 42,203.00 1.20 2.10 0.95 STA0342-060 US 34D OVERLAY AND BRIDGE WOR CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 46,933.00 1.59 2.00 2.00 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 3,236.00 5.00 2.48 4.25 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 31,196.00 1.50 1.54 0.96 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 1,620.00 1.50 2.70 2.12 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 25,685.00 1.50 1.48 2.25 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 602.00 2.00 2.54 2.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 3,511.00 3.00 2.58 1.25 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 2,556.00 3.20 2.17 2.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 17,536.00 1.10 1.39 1.90 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 7,270.00 2.00 1.28 1.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 186,765.00 1.56 1.79 1.63 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 66,735.00 1.40 1.51 1.26 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 4,487.00 2.00 1.92 1.75 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 760.00 1.50 3.50 5.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 45,010.00 1.10 1.44 1.42 FBR0705-087 I-70: EMERGENCY BRIDGE G-25-K 05/16/18 86,000.00 1.30 1.30 1.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 202,992.00 1.30 1.49 1.34 FBR060A-022 SH 60 over the South Platte 07/12/18 524,030.00 1.10 1.04 1.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 6,920.00 1.50 2.23 2.25 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 4,180.00 2.00 2.26 1.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 301 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 602-00020 Reinf Steel (Epoxy) Pound ================================================== C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 135,950.00 1.04 1.04 1.04 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 1,445.00 2.00 4.41 5.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 384,908.00 1.00 1.17 1.15 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 132.00 1.50 10.88 15.00 M850-027 US24E MANITOU AVE. AT RUXTON 08/28/18 25,000.00 5.00 1.26 1.50 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 109,400.00 1.30 1.38 1.20 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 319,420.00 1.20 1.15 1.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,511,385.00 1.17 1.13 1.08 BR1131-006 SH 113 AT MP 11.5 10/11/18 9,607.00 2.00 1.86 2.22 NHPP0702-366 I-70 Avon to Vail 11/08/18 500.00 4.00 4.66 4.30 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 740.00 2.00 4.95 6.30 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 20,340.00 2.20 2.55 1.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 5,505.00 2.00 2.08 1.57 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 131,844.00 1.16 1.24 1.24 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 7,750.00 2.00 2.60 2.25 STA086A-051 SH 86; WEST OF I-70 11/29/18 3,325.00 2.00 4.53 6.50 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 9,585.00 1.50 1.35 1.30 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 28,786.00 1.50 1.57 1.77 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 888,059.00 1.24 1.24 1.24 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,106,041.00 1.28 1.53 1.29 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,007,183.00 1.25 1.21 1.21 =============== 602-00210 Welded Wire Fabric Sq Yard ================================================ ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 373.00 60.05 14.64 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 373.00 60.05 14.64 8.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 373.00 60.05 14.64 8.00 =============== 603-00001 Annular Space Grouting Cubic Yard ============================================= STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 30.00 325.00 636.71 1.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 30.00 325.00 636.71 1.00 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 242.00 400.00 423.43 450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 242.00 400.00 423.43 450.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 272.00 391.73 456.87 400.48 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 302 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-00010 Culvert Lining Sq Foot ================================================ NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 4,212.00 60.00 43.77 37.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,212.00 60.00 43.77 37.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,212.00 60.00 43.77 37.00 =============== 603-00015 Culvert Lining (15 In) Lin Foot =============================================== STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 65.00 300.00 373.95 219.16 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 65.00 300.00 373.95 219.16 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 65.00 300.00 373.95 219.16 =============== 603-00036 Culvert Lining (36 In) Lin Foot =============================================== ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 126.00 350.00 499.02 480.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 126.00 350.00 499.02 480.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 126.00 350.00 499.02 480.00 =============== 603-00042 Culvert Lining (42 Inch) Lin Foot =============================================== ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 131.00 365.00 506.77 485.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 131.00 365.00 506.77 485.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 131.00 365.00 506.77 485.00 =============== 603-00048 Culvert Lining (48 In) Lin Foot =============================================== ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 633.00 325.00 450.97 430.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 633.00 325.00 450.97 430.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 303 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-00048 Culvert Lining (48 In) Lin Foot =============================================== NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 472.00 400.00 402.62 380.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 472.00 400.00 402.62 380.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,105.00 357.04 437.84 408.64 =============== 603-00052 Culvert Lining (48 In)(Spray App) Lin Foot =============================================== NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 390.00 425.00 431.38 420.00 STMR200-246 R2–2018 CRITICAL CULVERTS REP 09/20/18 472.00 425.00 300.00 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 862.00 425.00 400.86 354.29 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 862.00 425.00 400.86 354.29 =============== 603-00065 Culvert Lining (60 In)(Spray App) Lin Foot =============================================== NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 238.00 450.00 441.07 310.00 STMR200-246 R2–2018 CRITICAL CULVERTS REP 09/20/18 70.00 500.00 700.00 700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 308.00 461.36 458.81 398.64 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 308.00 461.36 458.81 398.64 =============== 603-00066 Culvert Lining (66 In) Lin Foot =============================================== NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 613.00 500.00 517.56 545.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 613.00 500.00 517.56 545.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 613.00 500.00 517.56 545.00 =============== 603-00072 Culvert Lining (72 In) Lin Foot =============================================== NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 338.00 525.00 488.33 370.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 338.00 525.00 488.33 370.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 338.00 525.00 488.33 370.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 304 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-00078 Culvert Lining (78 In) Lin Foot =============================================== NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 421.00 550.00 598.44 525.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 421.00 550.00 598.44 525.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 421.00 550.00 598.44 525.00 =============== 603-00084 Culvert Lining (84 In) Lin Foot =============================================== STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 77.00 580.00 950.91 890.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 77.00 580.00 950.91 890.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 77.00 580.00 950.91 890.00 =============== 603-00088 Culvert Lining (84 In)(Spray App) Lin Foot =============================================== NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 169.00 700.00 941.67 700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 169.00 700.00 941.67 700.00 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 688.00 575.00 583.53 510.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 688.00 575.00 583.53 510.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 857.00 599.65 639.25 547.47 =============== 603-01125 12 In RCP (CIP) Lin Foot =============================================== ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 110.00 85.00 81.81 100.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 110.00 85.00 81.81 100.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 139.00 200.00 225.00 225.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 139.00 200.00 225.00 225.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 305 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-01125 12 In RCP (CIP) Lin Foot =============================================== STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 126.00 110.00 213.40 300.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 411.00 62.00 70.51 51.53 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 537.00 73.26 110.10 109.83 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 786.00 97.32 110.23 128.82 =============== 603-01155 15 In RCP (CIP) Lin Foot =============================================== ER144A-002 SH 144 East and West of Goodr 03/08/18 27.00 125.00 103.80 111.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 27.00 125.00 103.80 111.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 120.00 85.00 95.81 104.67 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 120.00 85.00 95.81 104.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 147.00 92.35 98.68 105.83 =============== 603-01180 18 In RCP Lin Foot =============================================== SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 536.00 100.00 122.50 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 536.00 100.00 122.50 125.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 24.00 75.00 170.46 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 24.00 75.00 170.46 100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 560.00 98.93 126.44 123.93 =============== 603-01185 18 In RCP (CIP) Lin Foot =============================================== BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 439.00 78.00 96.71 90.92 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 306 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-01185 18 In RCP (CIP) Lin Foot =============================================== ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 681.00 100.00 150.99 115.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 149.00 150.00 86.71 53.43 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 407.00 90.00 95.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,676.00 96.25 122.52 99.58 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 87.00 124.00 141.58 130.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 132.00 210.00 235.00 235.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 219.00 175.84 160.44 193.29 FBR060A-022 SH 60 over the South Platte 07/12/18 132.00 100.00 82.95 80.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 13,776.00 89.78 89.78 89.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 13,908.00 89.88 89.08 89.69 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 50.00 100.00 153.92 96.77 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 24.00 160.00 219.83 145.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 371.00 100.00 100.15 72.19 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1,661.00 159.90 159.93 159.93 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 48.00 115.00 277.40 400.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 435.00 130.00 160.47 178.75 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 1,653.00 90.00 85.33 70.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 9,478.00 87.36 87.36 87.36 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 13,720.00 98.42 102.45 97.77 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 29,523.00 94.85 103.45 94.77 =============== 603-01240 24 In RCP Lin Foot =============================================== STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 40.00 110.00 182.95 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 40.00 110.00 182.95 300.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 8.00 76.00 413.14 370.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 307 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-01240 24 In RCP Lin Foot =============================================== IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 1,601.00 77.00 123.50 135.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,609.00 77.00 126.01 136.17 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,649.00 77.80 128.70 140.14 =============== 603-01245 24 In RCP (CIP) Lin Foot =============================================== ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 66.00 110.00 128.65 125.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 723.00 150.00 169.98 120.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 789.00 146.65 167.75 120.42 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 22.00 372.75 372.75 372.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 22.00 372.75 372.75 372.75 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 240.00 120.00 186.54 114.62 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 97.00 92.00 123.35 120.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 2,101.00 119.18 119.18 119.18 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,438.00 118.18 134.80 118.76 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,249.00 126.82 156.91 120.89 =============== 603-01275 27 In RCP (CIP) Lin Foot =============================================== FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 517.00 95.00 105.05 95.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 517.00 95.00 105.05 95.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 517.00 95.00 105.05 95.00 =============== 603-01300 30 In RCP Lin Foot =============================================== IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 162.00 100.00 155.47 173.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 162.00 100.00 155.47 173.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 162.00 100.00 155.47 173.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 308 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-01305 30 In RCP (CIP) Lin Foot =============================================== ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 49.00 135.00 162.41 200.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 617.00 220.00 171.47 135.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 666.00 213.75 171.04 139.78 FBR060A-022 SH 60 over the South Platte 07/12/18 64.00 200.00 131.27 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 64.00 200.00 131.27 125.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 128.00 140.00 207.23 156.70 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 8.00 400.00 361.50 310.99 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 304.00 160.00 221.49 178.75 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 440.00 100.00 119.85 100.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 241.00 162.75 162.75 162.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,121.00 136.47 167.65 142.83 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,851.00 166.47 166.57 141.11 =============== 603-01335 33 In RCP (CIP) Lin Foot =============================================== FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 292.00 125.00 136.99 115.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 292.00 125.00 136.99 115.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 292.00 125.00 136.99 115.00 =============== 603-01360 36 In RCP Lin Foot =============================================== ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 179.00 175.00 186.57 157.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 145.00 150.00 191.27 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 324.00 163.81 188.05 176.24 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 324.00 163.81 188.05 176.24 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 309 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-01365 36 In RCP (CIP) Lin Foot =============================================== NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 174.00 200.00 358.00 470.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 481.00 230.00 193.48 155.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 655.00 222.03 218.68 238.68 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 2,992.00 249.48 249.48 249.48 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,992.00 249.48 249.48 249.48 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 879.00 130.00 140.59 125.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 2,149.00 212.10 212.10 212.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,028.00 188.27 167.72 186.82 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,675.00 219.02 203.79 219.99 =============== 603-01425 42 In RCP (CIP) Lin Foot =============================================== ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 68.00 260.00 253.54 190.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 68.00 260.00 253.54 190.00 FBR060A-022 SH 60 over the South Platte 07/12/18 143.00 250.00 174.59 137.50 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 702.00 331.80 331.80 331.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 845.00 317.96 220.23 298.92 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 989.00 250.00 405.12 243.75 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 910.00 145.00 168.78 135.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 235.00 271.95 271.95 271.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,134.00 207.64 291.26 200.48 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,047.00 239.40 273.45 227.55 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 310 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-01485 48 In RCP (CIP) Lin Foot =============================================== STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 53.00 325.00 387.88 290.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 324.00 275.00 256.87 120.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 377.00 282.03 271.19 143.90 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 1,686.00 267.37 267.37 267.37 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,686.00 267.37 267.37 267.37 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 774.00 170.00 195.76 160.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 246.00 260.40 260.40 260.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,020.00 191.80 200.52 184.21 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,083.00 244.16 240.63 224.76 =============== 603-01545 54 In RCP (CIP) Lin Foot =============================================== FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 1,182.00 225.00 239.26 205.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 244.00 334.95 334.95 334.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,426.00 243.81 243.96 227.24 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,426.00 243.81 243.96 227.24 =============== 603-02185 23x14 In RCP (CIP) Lin Foot =============================================== SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 90.00 165.00 216.67 180.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 125.00 130.00 185.55 140.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 120.00 165.00 104.83 83.83 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 335.00 151.94 149.73 130.63 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 188.00 135.00 234.29 170.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 311 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-02185 23x14 In RCP (CIP) Lin Foot =============================================== STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 37.00 140.00 244.95 327.36 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 225.00 135.82 235.24 195.88 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 128.00 120.00 180.29 130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 128.00 120.00 180.29 130.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 688.00 140.73 178.68 151.85 =============== 603-02245 30x19 In RCP (CIP) Lin Foot =============================================== ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 344.00 150.00 204.12 150.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 344.00 150.00 204.12 150.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 15.00 140.00 271.04 219.16 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 74.00 170.00 241.08 236.49 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 89.00 164.94 247.45 233.57 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 217.00 150.00 209.14 175.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 217.00 150.00 209.14 175.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 650.00 152.05 208.48 169.79 =============== 603-02305 38x24 In RCP (CIP) Lin Foot =============================================== ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 77.00 180.00 240.79 165.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 77.00 180.00 240.79 165.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 77.00 180.00 240.79 165.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 312 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-02365 45x29 In RCP (CIP) Lin Foot =============================================== ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 366.00 250.00 224.15 195.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 366.00 250.00 224.15 195.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 366.00 250.00 224.15 195.00 =============== 603-02425 53x34 In RCP (CIP) Lin Foot =============================================== ER144A-002 SH 144 East and West of Goodr 03/08/18 70.00 265.00 215.23 163.57 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 70.00 265.00 215.23 163.57 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 147.00 324.45 324.45 324.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 147.00 324.45 324.45 324.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 217.00 305.27 234.18 272.55 =============== 603-02545 68x43 In RCP (CIP) Lin Foot =============================================== STA052A-040 SH 52: Antelope Creek 08/23/18 320.00 320.00 375.17 397.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 320.00 320.00 375.17 397.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 320.00 320.00 375.17 397.00 =============== 603-05012 12 In RCES Each =================================================== ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 1.00 1100.00 1070.87 1000.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1100.00 1070.87 1000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1100.00 1070.87 1000.00 =============== 603-05015 15 In RCES Each =================================================== ER144A-002 SH 144 East and West of Goodr 03/08/18 2.00 750.00 1284.06 1589.87 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 750.00 1284.06 1589.87 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 750.00 1284.06 1589.87 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 313 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-05018 18 In RCES Each =================================================== ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 38.00 1100.00 1016.71 700.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 6.00 1400.00 1308.14 1143.73 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 44.00 1140.91 1064.75 760.51 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 1.00 1675.00 1129.63 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 1675.00 1129.63 2000.00 FBR060A-022 SH 60 over the South Platte 07/12/18 8.00 1250.00 1293.66 900.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 15.00 997.50 997.50 997.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 23.00 1085.33 1253.64 963.59 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 1.00 1500.00 1611.50 850.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 10.00 1972.08 1972.43 1972.43 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 1.00 2000.00 1878.00 2000.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 7.00 997.50 997.50 997.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 19.00 1589.65 1634.49 1555.62 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 87.00 1230.35 1138.05 1002.09 =============== 603-05024 24 In RCES Each =================================================== ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 4.00 1500.00 1542.56 1500.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 27.00 1300.00 1161.54 780.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 2.00 1500.00 1573.04 750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 33.00 1336.36 1217.91 865.45 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 10.00 870.00 2220.87 2135.07 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 314 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-05024 24 In RCES Each =================================================== STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 1.00 1200.00 2672.86 3370.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 13.00 1155.00 1155.00 1155.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 24.00 1038.13 2007.02 1655.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 57.00 1210.79 1348.56 1198.17 =============== 603-05030 30 In RCES Each =================================================== ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 2.00 2000.00 1911.17 1750.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 18.00 1600.00 1391.45 1000.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 1640.00 1425.20 1075.00 FBR060A-022 SH 60 over the South Platte 07/12/18 2.00 1500.00 1444.22 1275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 1500.00 1444.22 1275.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 5.00 1080.00 2706.94 2397.28 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 1.00 2000.00 2362.00 2359.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 4.00 1365.00 1365.00 1365.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 1286.00 2415.91 1980.54 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 32.00 1520.63 1536.46 1370.48 =============== 603-05036 36 In RCES Each =================================================== NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 2.00 2000.00 2331.00 2400.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 4.00 1900.00 1772.77 1200.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 1933.33 1884.42 1600.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 14.00 1627.50 1627.50 1627.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 14.00 1627.50 1627.50 1627.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 315 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-05036 36 In RCES Each =================================================== ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 1.00 2890.00 2127.78 1656.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 19.00 1627.50 1627.50 1627.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 20.00 1690.63 1762.19 1628.93 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 1704.94 1799.73 1624.09 =============== 603-05042 42 In RCES Each =================================================== ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 1.00 2200.00 2041.98 1300.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 2200.00 2041.98 1300.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 3.00 1785.00 1785.00 1785.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 1785.00 1785.00 1785.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 3.00 1785.00 1785.00 1785.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 1785.00 1785.00 1785.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 1844.29 1931.84 1715.71 =============== 603-05118 23x14 In RCES Each =================================================== SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 1.00 1300.00 1356.67 970.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 6.00 1400.00 1218.64 850.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7.00 1385.71 1226.76 867.14 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 2.00 1250.00 2476.67 1780.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 1250.00 2476.67 1780.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 316 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-05118 23x14 In RCES Each =================================================== STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 2.00 1500.00 2624.29 3760.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 1500.00 2624.29 3760.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 1381.82 1607.95 1559.09 =============== 603-05124 30x19 In RCES Each =================================================== ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 12.00 1500.00 1429.95 1000.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12.00 1500.00 1429.95 1000.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 2.00 1600.00 2863.75 1941.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 1600.00 2863.75 1941.25 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 1.00 1600.00 3257.14 4050.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1600.00 3257.14 4050.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15.00 1520.00 1626.22 1328.83 =============== 603-05130 38x24 In RCES Each =================================================== ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 4.00 1800.00 1799.36 1300.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 1800.00 1799.36 1300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 1800.00 1799.36 1300.00 =============== 603-05142 53x34 In RCES Each =================================================== ER144A-002 SH 144 East and West of Goodr 03/08/18 2.00 3350.00 2736.35 1995.03 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 3350.00 2736.35 1995.03 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 317 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-05142 53x34 In RCES Each =================================================== C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 1.00 2415.00 2415.00 2415.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 2415.00 2415.00 2415.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 3038.33 2721.05 2135.02 =============== 603-10060 6 In CSP Lin Foot =============================================== FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 68.00 65.00 37.05 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 68.00 65.00 37.05 25.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 68.00 65.00 37.05 25.00 =============== 603-10120 12 In CSP Lin Foot =============================================== NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 26.00 60.00 210.00 210.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 26.00 60.00 210.00 210.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 100.00 50.00 60.65 46.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 100.00 50.00 60.65 46.95 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 50.00 175.00 90.14 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 50.00 175.00 90.14 65.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 176.00 86.99 81.66 76.16 =============== 603-10150 15 In CSP Lin Foot =============================================== CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 28.00 344.09 175.00 175.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 28.00 344.09 175.00 175.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 28.00 344.09 175.00 175.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 318 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-10180 18 In CSP Lin Foot =============================================== ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 37.00 70.00 140.90 81.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 90.00 100.00 103.47 88.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 127.00 91.26 114.37 85.96 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 60.00 70.00 81.58 54.75 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 110.00 75.00 138.37 140.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 120.00 170.00 66.88 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 290.00 113.28 84.46 83.05 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 32.00 86.00 156.65 92.64 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 80.00 100.00 119.79 69.58 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 50.00 175.00 110.14 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 162.00 120.38 120.06 75.81 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 579.00 110.44 99.05 81.66 =============== 603-10240 24 In CSP Lin Foot =============================================== ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 92.00 85.00 183.72 92.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 92.00 85.00 183.72 92.00 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 20.00 130.00 103.50 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20.00 130.00 103.50 120.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 42.00 95.00 210.36 111.87 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 42.00 95.00 210.36 111.87 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 154.00 93.57 178.87 101.06 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 319 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-10300 30 In CSP Lin Foot =============================================== NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 26.00 120.00 187.13 138.84 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 26.00 120.00 187.13 138.84 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26.00 120.00 187.13 138.84 =============== 603-10360 36 In CSP Lin Foot =============================================== NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 8.00 150.00 420.00 420.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 150.00 420.00 420.00 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 16.00 105.00 269.21 258.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 16.00 105.00 269.21 258.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 24.00 120.00 299.37 312.28 =============== 603-10480 48 In CSP Lin Foot =============================================== STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 144.00 215.00 214.28 190.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 70.00 105.00 158.96 94.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 214.00 179.02 192.53 158.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 214.00 179.02 192.53 158.60 =============== 603-15018 18 In Equiv CSPA Lin Foot =============================================== ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 8.00 80.00 232.02 150.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 80.00 232.02 150.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 80.00 232.02 150.00 =============== 603-30018 18 In SES Each =================================================== ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 4.00 650.00 328.55 90.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 320 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-30018 18 In SES Each =================================================== STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 650.00 328.55 90.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 3.00 100.00 1359.68 1585.70 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 2.00 300.00 610.44 820.87 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 180.00 1129.15 1279.77 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 388.89 559.83 750.98 =============== 603-30024 24 In SES Each =================================================== ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 6.00 700.00 405.56 130.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 700.00 405.56 130.00 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 2.00 900.00 555.00 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 900.00 555.00 500.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 3.00 140.00 1535.76 1723.04 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 140.00 1535.76 1723.04 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 583.64 579.68 631.74 =============== 603-30030 30 In SES Each =================================================== NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 3.00 200.00 1703.82 1985.24 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 200.00 1703.82 1985.24 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 200.00 1703.82 1985.24 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 321 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-30036 36 In SES Each =================================================== ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 2.00 900.00 673.67 260.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 900.00 673.67 260.00 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 2.00 850.00 975.42 1150.83 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 850.00 975.42 1150.83 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 875.00 734.02 705.42 =============== 603-31318 18 In Equiv Arch SES Each =================================================== ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 4.00 550.00 402.95 90.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 550.00 402.95 90.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 550.00 402.95 90.00 =============== 603-50006 6 In Plastic Pipe Lin Foot =============================================== NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 7.00 40.00 125.00 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7.00 40.00 125.00 125.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 40.00 125.00 125.00 =============== 603-50008 8 In Plastic Pipe Lin Foot =============================================== NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 100.00 65.00 28.33 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 100.00 65.00 28.33 25.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 100.00 65.00 28.33 25.00 =============== 603-50010 10 In Plastic Pipe Lin Foot =============================================== ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 103.00 50.00 74.98 85.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 322 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-50010 10 In Plastic Pipe Lin Foot =============================================== STA0342-060 US 34D OVERLAY AND BRIDGE WOR -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 103.00 50.00 74.98 85.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 103.00 50.00 74.98 85.00 =============== 603-50012 12 In Plastic Pipe Lin Foot =============================================== STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 32.00 75.00 100.12 78.13 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 32.00 75.00 100.12 78.13 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 32.00 75.00 100.12 78.13 =============== 603-50015 15 In Plastic Pipe Lin Foot =============================================== ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 43.00 120.00 73.22 77.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 43.00 120.00 73.22 77.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 43.00 120.00 73.22 77.00 =============== 603-50018 18 In Plastic Pipe Lin Foot =============================================== ER144A-002 SH 144 East and West of Goodr 03/08/18 40.00 100.00 83.87 60.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 40.00 100.00 83.87 60.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 100.00 83.87 60.20 =============== 603-50024 24 In Plastic Pipe Lin Foot =============================================== ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 5.00 85.00 272.49 132.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 85.00 272.49 132.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 85.00 272.49 132.00 =============== 603-50100 Flap Gate (__ Inch) Each =================================================== FBR060A-022 SH 60 over the South Platte 07/12/18 1.00 5000.00 5312.94 3650.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 5000.00 5312.94 3650.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5000.00 5312.94 3650.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 323 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-61120 12 In Flexible Pipe Lin Foot =============================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 58.00 85.29 85.29 85.29 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 15.00 100.00 100.04 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 73.00 88.31 93.61 88.31 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 73.00 88.31 93.61 88.31 =============== 603-70604 6x4 Ft CBC (Precast) Lin Foot =============================================== ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 150.00 825.00 726.54 560.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 150.00 825.00 726.54 560.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 150.00 825.00 726.54 560.00 =============== 603-70607 6x7 Ft CBC (Precast) Lin Foot =============================================== NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 74.00 800.00 1175.00 900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 74.00 800.00 1175.00 900.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 97.00 1774.50 1774.50 1774.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 97.00 1774.50 1774.50 1774.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 171.00 1352.79 1322.97 1396.06 =============== 603-71003 CBC (10 x 3 Ft) (Precast) Lin Foot =============================================== ER052A-039 SH 170 11/15/18 47.00 1750.00 1401.31 1640.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 47.00 1750.00 1401.31 1640.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 47.00 1750.00 1401.31 1640.00 =============== 603-71208 12x8 Ft CBC (Precast) Lin Foot =============================================== STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 75.00 2250.00 2680.31 2089.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 75.00 2250.00 2680.31 2089.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 75.00 2250.00 2680.31 2089.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 324 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 603-71210 12x10 Ft CBC (Precast) Lin Foot =============================================== FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 85.00 2000.00 2562.36 2768.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 85.00 2000.00 2562.36 2768.70 BR1131-006 SH 113 AT MP 11.5 10/11/18 188.00 2000.00 1988.49 2100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 188.00 2000.00 1988.49 2100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 273.00 2000.00 2140.93 2308.20 =============== 603-71508 15 x 8 Ft. CBC (Precast) Lin Foot =============================================== FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 198.00 1000.00 2293.00 1800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 198.00 1000.00 2293.00 1800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 198.00 1000.00 2293.00 1800.00 =============== 604-00305 Inlet Ty C (5 Ft) Each =================================================== STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 1.00 4350.00 4288.50 4000.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 2.00 3500.00 4287.89 4000.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 3783.33 4288.01 4000.00 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 1.00 2125.00 7350.00 11000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 2125.00 7350.00 11000.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 2.00 3675.00 3675.00 3675.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 3675.00 3675.00 3675.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 325 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-00305 Inlet Ty C (5 Ft) Each =================================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 4157.36 4158.08 4158.08 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 3.00 3000.00 4517.88 3200.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 11.00 3990.00 3990.00 3990.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 15.00 3803.16 4260.94 3843.21 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21.00 3708.21 4376.52 4190.38 =============== 604-00310 Inlet Ty C (10 Ft) Each =================================================== STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 1.00 5000.00 5650.00 4200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 5000.00 5650.00 4200.00 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 1.00 5000.00 8550.00 12000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 5000.00 8550.00 12000.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 2.00 4725.00 4725.00 4725.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 4725.00 4725.00 4725.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 4862.50 6143.75 6412.50 =============== 604-00350 Inlet Ty C (Spec) Each =================================================== NH0242-071 US 24 & 31ST STREET and US24 05/03/18 1.00 5700.00 6603.70 14000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 5700.00 6603.70 14000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5700.00 6603.70 14000.00 =============== 604-00505 Inlet Ty D (5 Ft) Each =================================================== NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 2.00 4000.00 5797.74 7000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 326 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-00505 Inlet Ty D (5 Ft) Each =================================================== ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 3.00 5000.00 5033.65 4500.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 1.00 5000.00 9171.76 9343.51 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 4666.67 5456.85 6140.59 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 8.00 4935.00 4935.00 4935.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 2.00 5000.00 4711.13 4000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 4948.00 4775.10 4748.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 1.00 4305.00 6016.95 3087.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 20.00 4935.00 4935.00 4935.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 21.00 4905.00 5215.50 4847.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 37.00 4877.97 5169.15 5030.01 =============== 604-00510 Inlet Ty D (10 Ft) Each =================================================== ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 2.00 6000.00 6448.58 6000.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 6000.00 6448.58 6000.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 11.00 6930.00 6930.00 6930.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 11.00 6930.00 6930.00 6930.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 1.00 5700.00 7109.31 5300.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 4.00 6930.00 6930.00 6930.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 6684.00 7019.66 6604.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18.00 6758.33 6730.41 6736.11 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 327 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-00515 Inlet Ty D (15 Ft) Each =================================================== C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 3.00 8085.00 8085.00 8085.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 8085.00 8085.00 8085.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 2.00 8085.00 8085.00 8085.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 8085.00 8085.00 8085.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 8085.00 8085.00 8085.00 =============== 604-00550 Inlet Ty D (Spec) Each =================================================== STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 1.00 8500.00 11351.43 9600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 8500.00 11351.43 9600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 8500.00 11351.43 9600.00 =============== 604-13005 Inlet Ty 13 (5 Ft) Each =================================================== ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 3.00 3500.00 3032.40 2550.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 3500.00 3032.40 2550.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 2.00 4423.86 4424.63 4424.63 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 1.00 4300.00 5638.28 3726.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 6.00 2750.00 4522.86 1916.92 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9.00 3294.19 4665.03 2675.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 3345.64 4120.82 2643.90 =============== 604-13010 Inlet Ty 13 (10 Ft) Each =================================================== FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 1.00 4000.00 6138.55 2261.71 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 4000.00 6138.55 2261.71 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 4000.00 6138.55 2261.71 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 328 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-14005 Inlet Spec (D) (5 Ft) Each =================================================== NHPP0702-366 I-70 Avon to Vail 11/08/18 1.00 5000.00 13513.60 17000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 5000.00 13513.60 17000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5000.00 13513.60 17000.00 =============== 604-14505 Inlet Spec (T) (5 Ft) Each =================================================== NHPP0702-366 I-70 Avon to Vail 11/08/18 1.00 7000.00 14454.84 13000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 7000.00 14454.84 13000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 7000.00 14454.84 13000.00 =============== 604-16005 Inlet Ty 16 (5 Ft) Each =================================================== ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 4.00 4500.00 8017.89 8600.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 4500.00 8017.89 8600.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 2.00 5000.00 12000.00 12000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 5000.00 12000.00 12000.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 3.00 5250.00 8078.57 6540.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 5.00 4903.56 4904.40 4904.40 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 2.00 4500.00 6740.00 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 4926.78 7265.89 5414.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 4829.24 7744.92 7033.88 =============== 604-16010 Inlet Ty 16 (10 Ft) Each =================================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 3.00 6129.44 6130.51 6130.51 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 6129.44 6130.51 6130.51 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 6129.44 6130.51 6130.51 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 329 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-16015 Inlet Ty 16 (15 Ft) Each =================================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 7728.44 7729.77 7729.77 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 7728.44 7729.77 7729.77 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 7728.44 7729.77 7729.77 =============== 604-16505 Inlet Ty 16 (D) (5 Ft) Each =================================================== SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 1.00 5000.00 8300.00 5600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 5000.00 8300.00 5600.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 9.00 7500.00 13000.00 13000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 9.00 7500.00 13000.00 13000.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 7390.51 7391.80 7391.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 7390.51 7391.80 7391.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 7262.77 11483.98 11817.44 =============== 604-16510 Inlet Ty 16 (D) (10 Ft) Each =================================================== STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 10.00 6000.00 8571.01 5929.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 6000.00 8571.01 5929.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 6000.00 8571.01 5929.00 =============== 604-19000 Inlet Spec Each =================================================== NHPP0703-436 EJMT PLENUM WATERPROOFING MEM 06/28/18 2.00 2400.00 5441.00 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 2400.00 5441.00 5000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 2400.00 5441.00 5000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 330 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-19010 Inlet Spec (10 Ft) Each =================================================== STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 1.00 5400.00 10963.43 10000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 5400.00 10963.43 10000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5400.00 10963.43 10000.00 =============== 604-19105 Inlet Ty R L5 (5 Ft) Each =================================================== NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 1.00 6000.00 7853.33 6750.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 4.00 6928.94 6930.15 6930.15 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 4.00 5000.00 6670.00 5200.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 45.00 4750.00 6039.63 4100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 54.00 4953.07 6168.44 4440.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 54.00 4953.07 6168.44 4440.20 =============== 604-19110 Inlet Ty R L5 (10 Ft) Each =================================================== NH0242-071 US 24 & 31ST STREET and US24 05/03/18 1.00 8700.00 7366.67 10000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 8700.00 7366.67 10000.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 4.00 8314.72 8316.17 8316.17 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 8314.72 8316.17 8316.17 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 8391.78 7746.47 8652.94 =============== 604-19205 Inlet Ty R L10 (5 Ft) Each =================================================== NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 4.00 6000.00 6700.00 6400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 6000.00 6700.00 6400.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 1.00 5000.00 8526.12 2170.48 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 5000.00 8526.12 2170.48 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 5800.00 7308.71 5554.10 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 331 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-19415 Inlet Ty R Spec (15 Ft) Each =================================================== STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 1.00 16500.00 14070.00 7650.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 16500.00 14070.00 7650.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 16500.00 14070.00 7650.00 =============== 604-25000 Vane Grate Inlet Spec Each =================================================== FBR060A-022 SH 60 over the South Platte 07/12/18 4.00 6750.00 8078.14 7500.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 2.00 8000.00 8832.19 14000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 7166.67 8299.92 9666.67 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 1.00 7000.00 31714.99 4600.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 2.00 7000.00 10442.97 9944.62 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 11.00 9208.50 9208.50 9208.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 14.00 8735.25 13552.05 8984.48 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 8264.68 9627.38 9189.14 =============== 604-25005 Vane Grate Inlet (5 Ft) Each =================================================== NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 2.00 5000.00 8200.00 10400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 5000.00 8200.00 10400.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 46.00 6695.12 6695.12 6695.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 46.00 6695.12 6695.12 6695.12 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 1.00 5000.00 9082.86 6500.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 1.00 4300.00 5848.09 4600.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 332 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-25005 Vane Grate Inlet (5 Ft) Each =================================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 33.00 7581.00 7581.00 7581.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 35.00 7413.51 7662.39 7464.94 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 83.00 6957.21 7211.92 7109.02 =============== 604-25010 Vane Grate Inlet (10 Ft) Each =================================================== C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 44.00 8273.96 8273.96 8273.96 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 44.00 8273.96 8273.96 8273.96 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 1.00 5000.00 10290.24 6200.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 11.00 8631.00 8631.00 8631.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 12.00 8328.42 9073.46 8428.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 56.00 8285.63 8477.22 8307.06 =============== 604-25015 Vane Grate Inlet (15 Ft) Each =================================================== C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 3.00 9023.50 9023.50 9023.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 9023.50 9023.50 9023.50 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 2.00 10468.50 10468.50 10468.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 10468.50 10468.50 10468.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 9601.50 9601.50 9601.50 =============== 604-26005 Vane Grate Inlet (D) (5 Ft) Each =================================================== BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 3.00 2500.00 5856.94 4813.33 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 2500.00 5856.94 4813.33 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 333 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-26005 Vane Grate Inlet (D) (5 Ft) Each =================================================== C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 11.00 8612.17 8612.17 8612.17 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 11.00 8612.17 8612.17 8612.17 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 7.00 5500.00 8292.02 7800.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 28.00 10153.50 10153.50 10153.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 35.00 9222.80 9222.76 9682.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 49.00 8674.12 8343.23 9144.32 =============== 604-26010 Vane Grate Inlet (D) (10 Ft) Each =================================================== C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 3.00 12628.16 12628.16 12628.16 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 12628.16 12628.16 12628.16 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 2.00 6500.00 9291.17 8800.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 3.00 4693.50 4693.50 4693.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 5416.10 8037.26 6336.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 8120.62 9021.02 8695.62 =============== 604-26015 Vane Grate Inlet (D) (15 Ft) Each =================================================== C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 3.00 13215.50 13215.50 13215.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 13215.50 13215.50 13215.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 13215.50 13215.50 13215.50 =============== 604-30005 MH Slab Base (5 Ft) Each =================================================== SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 1.00 4000.00 8250.00 12000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 334 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-30005 MH Slab Base (5 Ft) Each =================================================== NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 5.00 6000.00 10000.00 10000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 5666.67 9500.00 10333.33 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 2.00 3255.00 3255.00 3255.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 3255.00 3255.00 3255.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 1.00 5000.00 6818.67 6750.00 ER052A-039 SH 170 11/15/18 2.00 4200.00 5687.10 5400.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 4263.96 4264.70 4264.70 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 3.00 5000.00 6240.00 2000.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 1.00 3200.00 5620.76 4600.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 7.00 3500.00 4308.40 5273.11 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 3360.00 3360.00 3360.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 16.00 3982.75 5263.48 4542.90 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 24.00 4343.08 5609.95 5883.19 =============== 604-30010 MH Slab Base (10 Ft) Each =================================================== STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 1.00 5000.00 4265.00 3200.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 1.00 3000.00 6945.41 7000.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 1.00 4500.00 6700.00 5900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 4166.67 6144.52 5366.67 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 2.00 5145.00 5145.00 5145.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 5145.00 5145.00 5145.00 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 2.00 4500.00 6556.44 2900.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 335 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-30010 MH Slab Base (10 Ft) Each =================================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 5063.46 5064.34 5064.34 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 3.00 4500.00 10258.50 6900.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 29.00 5500.00 6541.38 6500.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 5.00 5145.00 5145.00 5145.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 40.00 5319.71 6793.44 6144.73 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 45.00 5235.08 6716.05 6048.43 =============== 604-30015 MH Slab Base (15 Ft) Each =================================================== C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 6.00 6615.00 6615.00 6615.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 6615.00 6615.00 6615.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 3.00 9274.12 9275.73 9275.73 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 3.00 9000.00 10744.78 6500.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 8610.00 8610.00 8610.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 7.00 9061.77 10335.91 7991.03 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13.00 7932.49 9321.12 7355.94 =============== 604-30020 MH Slab Base (20 Ft) Each =================================================== C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 2.00 7875.00 7875.00 7875.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 7875.00 7875.00 7875.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 50101.53 50110.25 50110.25 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 9555.00 9555.00 9555.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 29828.27 29832.63 29832.63 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 18851.63 18853.81 18853.81 =============== 604-30025 MH Slab Base (25 Ft) Each =================================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 2.00 10290.00 10290.00 10290.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 10290.00 10290.00 10290.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 10290.00 10290.00 10290.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 336 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-31000 MH Box Base (Spec) Each =================================================== C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 8.00 15519.30 15519.30 15519.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 15519.30 15519.30 15519.30 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 1.00 13000.00 13920.09 5000.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 3.00 22018.50 22018.50 22018.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 19763.88 17390.84 17763.88 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 16934.16 16392.68 16267.49 =============== 604-31010 MH Box Base (10 Ft) Each =================================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 14910.00 14910.00 14910.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 14910.00 14910.00 14910.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 14910.00 14910.00 14910.00 =============== 604-31015 MH Box Base (15 Ft) Each =================================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 16905.00 16905.00 16905.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 16905.00 16905.00 16905.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 16905.00 16905.00 16905.00 =============== 604-39000 MH Spec Each =================================================== ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 1.00 15000.00 16010.85 590.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 15000.00 16010.85 590.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 1.00 6500.00 7233.33 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 6500.00 7233.33 5000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 337 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-39000 MH Spec Each =================================================== C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 2.00 17850.00 17850.00 17850.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 17850.00 17850.00 17850.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 6.00 7500.00 12716.16 9634.63 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 6.00 64155.00 64155.00 64155.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 12.00 35827.50 23003.93 36894.82 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 30445.63 20169.47 30251.74 =============== 604-39050 MH (TMS) Each =================================================== NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 3.00 8000.00 11791.67 5500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 8000.00 11791.67 5500.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 24.00 8912.27 8912.27 8912.27 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 24.00 8912.27 8912.27 8912.27 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 49.00 7800.00 7885.67 8000.00 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 29.00 5413.79 6044.55 7500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 78.00 6912.82 7073.62 7814.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 105.00 7400.90 7366.15 7999.00 =============== 604-50003 IG and F Ty C Each =================================================== NHPP0702-366 I-70 Avon to Vail 11/08/18 6.00 2000.00 1696.23 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 2000.00 1696.23 350.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 2000.00 1696.23 350.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 338 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 604-50200 MH R and C Each =================================================== ER052A-039 SH 170 11/15/18 2.00 500.00 834.57 752.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 500.00 834.57 752.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 500.00 834.57 752.00 =============== 604-83110 10 In PPS (PVC) Lin Foot =============================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 390.00 141.75 141.75 141.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 390.00 141.75 141.75 141.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 390.00 141.75 141.75 141.75 =============== 605-00004 4 In Underdrain Lin Foot =============================================== NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 100.00 15.00 45.69 49.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 100.00 15.00 45.69 49.00 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 710.00 15.00 45.25 20.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 710.00 15.00 45.25 20.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 810.00 15.00 45.35 24.02 =============== 605-00040 4 In PP Underdrain Lin Foot =============================================== NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 98.00 15.00 42.80 48.76 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 98.00 15.00 42.80 48.76 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 541.00 20.00 42.50 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 541.00 20.00 42.50 15.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 639.00 19.23 42.58 20.18 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 339 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 605-00060 6 In PP Underdrain Lin Foot =============================================== NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 1,656.00 25.00 56.25 25.00 ER1151-033 PR SH 115-MP 34.7 01/25/18 99.00 25.00 89.94 250.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 140.00 280.00 44.50 40.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,895.00 43.84 56.27 37.86 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,895.00 43.84 56.27 37.86 =============== 605-82100 Pipe Edge Drain Lin Foot =============================================== STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 785.00 12.00 108.26 63.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 785.00 12.00 108.26 63.05 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 785.00 12.00 108.26 63.05 =============== 605-83001 Geocomp Drain (w/o Pipe) Sq Yard ================================================ NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 25.00 89.32 95.43 95.43 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 25.00 89.32 95.43 95.43 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25.00 89.32 95.43 95.43 =============== 605-83002 Geocomp Drain (w/ Pipe) Sq Yard ================================================ ER052A-039 SH 170 11/15/18 55.00 40.00 37.44 16.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 102.00 31.50 31.50 31.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 157.00 34.48 35.83 26.07 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 157.00 34.48 35.83 26.07 =============== 605-84000 Subsurface Drain Outlet Lin Foot =============================================== NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 5.00 50.00 178.54 76.66 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 50.00 178.54 76.66 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 50.00 178.54 76.66 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 340 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 605-84100 Subsurface Drain Outlet Str Each =================================================== NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 12.00 5000.00 1250.00 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12.00 5000.00 1250.00 300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 5000.00 1250.00 300.00 =============== 606-00301 Gdrail Ty 3 (6-3) Lin Foot =============================================== STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 12,950.00 25.00 22.53 24.00 STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 100.00 50.00 64.35 60.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 26,112.50 25.00 21.76 21.25 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 5,487.50 30.00 21.75 19.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 250.00 31.00 31.18 34.75 STA0342-060 US 34D OVERLAY AND BRIDGE WOR ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 550.00 25.50 31.09 27.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 919.00 30.00 29.13 30.00 STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 11,399.00 26.00 24.00 24.00 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 75.00 50.00 48.97 50.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 2,382.00 29.00 21.93 20.43 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 100.00 50.00 52.08 34.42 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 3,967.00 25.00 20.37 23.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 50.00 50.00 38.65 38.75 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 31.00 26.00 74.75 71.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 1,275.00 50.00 58.79 64.50 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 163.00 55.00 36.30 30.70 NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 10,900.00 35.00 24.15 22.85 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 125.00 40.00 54.53 46.50 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 150.00 25.00 35.50 37.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 76,986.00 27.73 24.27 23.37 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 462.50 25.00 31.55 29.63 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 1,050.00 28.00 30.62 27.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 413.00 50.00 35.16 37.84 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 12,725.00 28.00 19.73 19.40 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 1,313.00 30.00 33.05 30.96 FBR0705-087 I-70: EMERGENCY BRIDGE G-25-K 05/16/18 400.00 45.00 45.00 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16,363.50 29.05 23.21 22.20 FBR060A-022 SH 60 over the South Platte 07/12/18 257.00 30.00 37.50 36.25 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 341 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-00301 Gdrail Ty 3 (6-3) Lin Foot =============================================== NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 175.00 50.00 63.43 60.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 475.00 25.00 46.39 42.50 SHE0701-245 I-70 MEDIAN CABLE RAIL INSTAL 07/12/18 3,045.00 27.00 23.80 23.80 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 1,393.00 20.00 43.10 32.94 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 962.50 25.00 35.41 40.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 1,219.00 30.00 36.29 40.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 1,176.00 23.00 39.65 41.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 1,563.00 28.00 30.58 29.00 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 125.00 30.00 63.25 86.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10,390.50 26.33 35.94 33.68 NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 225.00 28.00 57.00 57.00 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 1,200.00 40.00 29.48 28.45 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 12,126.00 38.00 26.38 24.05 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 2,575.00 25.00 30.49 27.71 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 687.50 37.00 36.21 32.65 NHPP0702-366 I-70 Avon to Vail 11/08/18 35,338.00 30.00 41.07 35.25 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 1,150.00 22.00 47.96 47.67 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 125.00 42.00 43.10 37.68 ER052A-039 SH 170 11/15/18 300.00 40.00 81.33 73.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1,409.00 55.97 47.86 47.86 C R500-198 R5 GUARDRAIL REPLACEMENT/UPGR 11/29/18 4,650.00 35.00 30.18 27.50 STA086A-051 SH 86; WEST OF I-70 11/29/18 300.00 20.00 57.88 49.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 38.00 50.00 54.43 47.97 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 75,397.00 26.09 26.09 26.09 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 135,520.50 28.96 34.58 29.06 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 239,260.50 28.46 29.36 26.96 =============== 606-00305 Gdrail Ty 3 (Spec) Lin Foot =============================================== STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 24.00 35.00 37.68 42.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 24.00 35.00 37.68 42.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 24.00 35.00 37.68 42.00 =============== 606-00310 Gdrail Ty 3A Lin Foot =============================================== ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 288.00 120.00 49.00 57.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 288.00 120.00 49.00 57.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 288.00 120.00 49.00 57.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 342 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-00350 Gdrail Ty 3 (D) (6-3) Lin Foot =============================================== SHE0701-245 I-70 MEDIAN CABLE RAIL INSTAL 07/12/18 1,476.00 37.00 38.50 38.50 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 17,684.00 40.00 76.20 53.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 19,160.00 39.77 74.69 52.34 NHPP0702-366 I-70 Avon to Vail 11/08/18 1,063.00 35.00 60.64 62.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,063.00 35.00 60.64 62.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20,223.00 39.52 73.24 52.87 =============== 606-00601 Gdrail Ty 6 (6-3) Lin Foot =============================================== NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 444.00 35.00 32.98 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 444.00 35.00 32.98 35.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 12.00 40.00 128.56 130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 12.00 40.00 128.56 130.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 456.00 35.13 35.49 37.50 =============== 606-00705 Gdrail Ty 7 (Spec) Lin Foot =============================================== C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 690.00 186.25 186.25 186.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 690.00 186.25 186.25 186.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 690.00 186.25 186.25 186.25 =============== 606-00710 Gdrail Ty 7 (Sty CA) Lin Foot =============================================== STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 135.00 125.00 205.76 275.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 343 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-00710 Gdrail Ty 7 (Sty CA) Lin Foot =============================================== BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 67.00 120.00 116.64 70.04 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 385.00 80.00 108.32 90.53 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 128.00 65.00 191.75 90.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 85.00 60.00 100.00 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 800.00 86.42 130.63 119.80 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 60.00 75.00 146.30 175.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 60.00 75.00 146.30 175.00 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 12.00 170.00 737.50 795.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.00 170.00 737.50 795.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 23.00 150.00 178.31 180.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 23.00 150.00 178.31 180.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 895.00 88.41 135.55 134.10 =============== 606-00716 Gdrail Ty 7 (Sty CA) (Spec) Lin Foot =============================================== NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 960.00 60.00 129.88 105.00 STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 300.00 95.00 155.00 155.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 430.00 250.00 302.84 395.68 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,690.00 114.56 161.13 187.84 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,690.00 114.56 161.13 187.84 =============== 606-00720 Gdrail Ty 7 (Sty CC) Lin Foot =============================================== STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 30.00 150.00 226.13 220.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 30.00 150.00 226.13 220.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 150.00 226.13 220.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 344 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-00731 Gdrail Ty 7 (Sty CD) (Spec) Lin Foot =============================================== C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 2,165.00 81.38 81.38 81.38 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,165.00 81.38 81.38 81.38 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,165.00 81.38 81.38 81.38 =============== 606-00740 Gdrail Ty 7 (Sty CE) Lin Foot =============================================== BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 2,064.00 85.00 110.37 92.14 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 95.00 125.00 191.09 185.66 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 667.00 85.00 129.00 98.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,826.00 86.34 115.15 96.67 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 402.00 85.00 179.28 96.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 402.00 85.00 179.28 96.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,228.00 86.18 120.86 96.58 =============== 606-00741 Gdrail Ty 7 (Sty CE) (Spec) Lin Foot =============================================== BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 322.00 175.00 277.88 305.98 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 322.00 175.00 277.88 305.98 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 23,170.00 117.67 117.67 117.67 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 23,170.00 117.67 117.67 117.67 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 65.00 140.00 215.92 185.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 65.00 140.00 215.92 185.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 23,557.00 118.52 132.72 120.43 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 345 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-00745 Gdrail Ty 7 (Sty CE)(Conc Glare Screen) Lin Foot =============================================== IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 209.00 120.00 168.75 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 209.00 120.00 168.75 80.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 209.00 120.00 168.75 80.00 =============== 606-00900 Gdrail (Spec) Lin Foot =============================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 740.00 254.78 254.78 254.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 740.00 254.78 254.78 254.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 740.00 254.78 254.78 254.78 =============== 606-00910 Guardrail Type 9 (Style CA) Lin Foot =============================================== NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 315.00 100.00 211.00 130.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1,645.00 100.19 100.19 100.19 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,960.00 100.16 130.88 104.98 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,960.00 100.16 130.88 104.98 =============== 606-00915 Guardrail Type 9 (Style CG) Lin Foot =============================================== IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 5,607.00 75.00 84.25 82.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5,607.00 75.00 84.25 82.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,607.00 75.00 84.25 82.00 =============== 606-00916 Guardrail Type 9 (Style CA) (Special) Lin Foot =============================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1,415.00 73.98 73.98 73.98 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,415.00 73.98 73.98 73.98 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,415.00 73.98 73.98 73.98 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 346 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-00917 Guardrail Type 9 (Style CG) (Special) Lin Foot =============================================== IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 1,746.00 135.00 289.50 158.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,746.00 135.00 289.50 158.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,746.00 135.00 289.50 158.00 =============== 606-00931 Guardrail Type 9 (Style CD) (Special) Lin Foot =============================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1,647.00 144.74 144.74 144.74 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,647.00 144.74 144.74 144.74 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,647.00 144.74 144.74 144.74 =============== 606-00940 Guardrail Type 9 (Style CE) Lin Foot =============================================== IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 624.00 85.00 230.00 280.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 38,033.00 129.55 129.55 129.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 38,657.00 128.83 135.74 131.98 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 38,657.00 128.83 135.74 131.98 =============== 606-00941 Guardrail Type 9 (Style CE) (Special) Lin Foot =============================================== IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 397.00 237.00 234.00 184.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 397.00 237.00 234.00 184.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 397.00 237.00 234.00 184.00 =============== 606-00942 Guardrail Type 9 (Style CGE) Lin Foot =============================================== IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 10,140.00 100.00 120.88 120.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 4,668.00 180.74 180.74 180.74 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 14,808.00 125.45 127.05 139.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14,808.00 125.45 127.05 139.15 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 347 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-00943 Guardrail Type 9 (Style CGE) (Special) Lin Foot =============================================== IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 5,788.00 140.00 170.38 160.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5,788.00 140.00 170.38 160.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,788.00 140.00 170.38 160.00 =============== 606-00944 Guardrail Type 9 (Style CGD) (Special) Lin Foot =============================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 176.00 278.76 278.76 278.76 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 176.00 278.76 278.76 278.76 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 176.00 278.76 278.76 278.76 =============== 606-01320 End Anchor Ty 3B Each =================================================== STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 8.00 1800.00 1641.95 1640.00 NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 5.00 800.00 2417.73 2286.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 13.00 1415.38 1940.32 1888.46 NHPP0702-366 I-70 Avon to Vail 11/08/18 3.00 1400.00 2420.68 2950.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 1.00 2500.00 3232.02 2746.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 1675.00 2719.59 2899.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17.00 1476.47 2148.86 2126.24 =============== 606-01340 End Anchor Ty 3D Each =================================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 2.00 1500.00 3250.00 3000.00 ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 1.00 1500.00 1761.39 1700.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 2.00 1200.00 922.50 950.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 2.00 1500.00 1110.40 1048.24 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 1.00 1500.00 1902.50 1560.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 1.00 1500.00 1155.00 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9.00 1433.33 1510.94 1606.28 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 348 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-01340 End Anchor Ty 3D Each =================================================== NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 22.00 1700.00 1514.36 1460.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 4.00 1285.00 1107.00 1060.35 FBR0705-087 I-70: EMERGENCY BRIDGE G-25-K 05/16/18 2.00 1500.00 1500.00 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 28.00 1626.43 1452.60 1405.76 SHE0701-245 I-70 MEDIAN CABLE RAIL INSTAL 07/12/18 5.00 1500.00 1501.00 1501.00 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 3.00 2000.00 1567.50 1750.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 1.00 1500.00 1122.81 1240.00 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 1.00 1600.00 1993.75 2516.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 1660.00 1444.52 1651.10 NHPP0702-366 I-70 Avon to Vail 11/08/18 29.00 1800.00 2081.49 1055.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 6.00 1332.50 1353.81 1353.81 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 28.00 1008.64 1008.64 1008.64 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 63.00 1403.76 1852.12 1062.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 110.00 1486.15 1645.10 1248.08 =============== 606-01370 Transition Ty 3G Each =================================================== STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 8.00 2000.00 1736.43 1800.00 STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 4.00 1500.00 4525.00 5000.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 20.00 2600.00 2104.52 2040.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 8.00 1700.00 2233.75 1585.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 4.00 1650.00 1942.78 2350.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 1.00 2200.00 5625.00 1900.00 STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 10.00 1500.00 3710.00 3710.00 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 2.00 2500.00 2760.36 3250.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 15.00 1700.00 2538.92 1929.61 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 2.00 2500.00 3308.87 3696.97 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 12.00 2000.00 2328.98 2500.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 2.00 2500.00 3100.24 3100.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 349 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-01370 Transition Ty 3G Each =================================================== FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 1.00 2500.00 2693.75 2675.00 ER144A-002 SH 144 East and West of Goodr 03/08/18 2.00 2100.00 3046.91 2730.00 NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 7.00 3000.00 2841.43 2685.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 2.00 1800.00 3098.57 2900.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 1.00 2000.00 4840.00 4680.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 2.00 2100.00 2210.00 2300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 103.00 2071.84 2534.10 2498.33 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 5.00 3000.00 5141.80 6348.00 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 4.00 1750.00 2488.10 2282.72 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 12.00 1900.00 2694.02 2575.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 4.00 2300.00 2887.50 2353.00 FBR0705-087 I-70: EMERGENCY BRIDGE G-25-K 05/16/18 4.00 3300.00 3300.00 3300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 29.00 2317.24 3133.70 3254.58 FBR060A-022 SH 60 over the South Platte 07/12/18 4.00 2500.00 2410.65 2275.00 SHE0701-245 I-70 MEDIAN CABLE RAIL INSTAL 07/12/18 8.00 2000.00 2405.00 2405.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 4.00 1775.00 2443.17 2370.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 12.00 2000.00 2462.57 2500.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 4.00 1900.00 2390.23 2400.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 4.00 2200.00 2042.16 1940.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 36.00 2041.67 2350.29 2366.11 NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 1.00 2100.00 5197.00 5200.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 3.00 2500.00 3170.58 2561.74 NHPP0702-366 I-70 Avon to Vail 11/08/18 20.00 3500.00 3050.66 2975.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 6.00 2000.00 3321.00 3297.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 4.00 2000.00 2784.60 2301.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 8.00 3144.67 6632.38 6632.38 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 4.00 1220.00 2780.00 2800.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 12.00 2500.00 2854.72 3750.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 1.00 1800.00 3606.47 3500.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 2.00 2000.00 2484.56 2468.97 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 27.00 2981.36 2981.36 2981.36 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 88.00 2794.71 3074.52 3404.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 256.00 2343.88 2711.94 2876.78 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 350 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-01371 Transition Ty 3G (Spec) Each =================================================== STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 2.00 3000.00 3576.86 3300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 3000.00 3576.86 3300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 3000.00 3576.86 3300.00 =============== 606-01380 Transition Ty 3H Each =================================================== FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 1.00 1500.00 1499.92 1500.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 10.00 700.00 1713.52 1200.12 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 2.00 1200.00 1747.46 2110.86 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 13.00 838.46 1706.86 1363.30 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 7.00 1200.00 1326.29 1275.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 3.00 1560.00 1701.00 1256.99 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 1308.00 1438.70 1269.60 SHE0701-245 I-70 MEDIAN CABLE RAIL INSTAL 07/12/18 4.00 2000.00 1137.00 1137.00 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 2.00 1300.00 2492.50 3110.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 4.00 1225.00 1655.63 1360.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 1550.00 1682.15 1620.80 NHPP0702-366 I-70 Avon to Vail 11/08/18 14.00 1800.00 1965.89 1450.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 1.00 1500.00 2248.60 1906.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 8.00 1241.97 1241.97 1241.97 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 23.00 1592.86 1912.19 1397.47 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 56.00 1359.21 1717.61 1406.58 =============== 606-01385 Transition Ty 3J Each =================================================== STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 2.00 1750.00 661.57 700.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 351 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-01385 Transition Ty 3J Each =================================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 2.00 1500.00 3025.00 3000.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 2.00 1600.00 1178.31 1185.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 2.00 1700.00 1498.75 1085.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 2.00 1650.00 983.45 625.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 1.00 2000.00 1900.00 1900.00 NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 5.00 2500.00 1995.14 1880.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16.00 1931.25 1532.99 1530.63 FBR0705-087 I-70: EMERGENCY BRIDGE G-25-K 05/16/18 4.00 1300.00 1300.00 1300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 1300.00 1300.00 1300.00 FBR060A-022 SH 60 over the South Platte 07/12/18 2.00 1200.00 1403.57 1350.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 1.00 1800.00 2162.27 2000.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 2.00 2000.00 1395.42 1330.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 1640.00 1460.68 1472.00 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 2.00 1400.00 1782.50 1720.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 1.00 1550.00 2561.99 1855.96 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 4.00 1250.00 1974.35 2265.60 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 2.00 1279.20 1700.25 1700.25 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 4.00 1221.00 2140.00 2400.00 C R500-198 R5 GUARDRAIL REPLACEMENT/UPGR 11/29/18 4.00 1800.00 2125.00 1700.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 1180.45 1180.45 1180.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 18.00 1398.49 2033.94 1963.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 43.00 1615.65 1699.76 1683.47 =============== 606-01390 End Anchor Ty 3K Each =================================================== STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 2.00 1750.00 1150.73 1200.00 STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 2.00 1500.00 2482.50 2500.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 2.00 2200.00 1622.47 1615.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 352 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-01390 End Anchor Ty 3K Each =================================================== NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 2.00 1700.00 1212.50 1075.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 2.00 1650.00 1565.34 1550.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 1.00 2500.00 1900.00 1900.00 NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 5.00 2500.00 1766.05 1670.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 2.00 1500.00 2177.18 2100.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 1.00 2000.00 4184.00 4368.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 19.00 1978.95 1790.81 1826.21 FBR060A-022 SH 60 over the South Platte 07/12/18 2.00 1500.00 1782.39 1700.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 1.00 1800.00 2031.61 2100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 1600.00 1817.99 1833.33 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 2.00 1800.00 1732.50 1670.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 1.00 1850.00 1973.65 1855.96 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 4.00 1700.00 2122.85 2242.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 2.00 1599.00 2238.58 2238.58 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 4.00 1500.00 2120.00 2500.00 C R500-198 R5 GUARDRAIL REPLACEMENT/UPGR 11/29/18 6.00 3000.00 1862.50 2100.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 1370.30 1370.30 1370.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 20.00 2040.92 2045.67 2130.57 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 42.00 1981.39 1900.42 1971.65 =============== 606-01392 Interrupted Structure Approach Lin Foot =============================================== C R500-198 R5 GUARDRAIL REPLACEMENT/UPGR 11/29/18 50.00 48.00 137.00 74.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 50.00 48.00 137.00 74.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 48.00 137.00 74.00 =============== 606-01395 Transition Ty 3L Each =================================================== STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 8.00 2000.00 1282.47 1290.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 2000.00 1282.47 1290.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 353 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-01395 Transition Ty 3L Each =================================================== NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 8.00 1400.00 1420.00 1370.00 C R500-198 R5 GUARDRAIL REPLACEMENT/UPGR 11/29/18 14.00 1500.00 1750.00 1825.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 22.00 1463.64 1630.00 1659.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 1606.67 1483.67 1561.00 =============== 606-01460 Median Terminal Each =================================================== BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 1.00 5700.00 4894.44 4587.64 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 5700.00 4894.44 4587.64 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 3.00 4200.00 5483.19 5200.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 1.00 4300.00 8097.50 9400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 4225.00 6354.63 6250.00 SHE0701-245 I-70 MEDIAN CABLE RAIL INSTAL 07/12/18 2.00 4500.00 5048.00 5048.00 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 18.00 4000.00 9725.00 7500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20.00 4050.00 9478.84 7254.80 NHPP0702-366 I-70 Avon to Vail 11/08/18 2.00 4200.00 7766.07 6200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 4200.00 7766.07 6200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 27.00 4148.15 8041.82 6929.02 =============== 606-02000 End Anchor (Spec) Each =================================================== ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 2.00 1500.00 987.84 970.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 354 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-02000 End Anchor (Spec) Each =================================================== STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1500.00 987.84 970.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1500.00 987.84 970.00 =============== 606-02003 End Anchor (Nonflared) Each =================================================== STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 74.00 2250.00 2371.11 2600.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 14.00 3000.00 2864.95 2580.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 1.00 2200.00 2787.50 2330.00 ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 1.00 2000.00 3981.03 3400.00 STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 10.00 3500.00 3800.00 3800.00 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 2.00 2500.00 2913.79 4100.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 1.00 4200.00 6025.72 4900.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 28.00 3000.00 2839.81 2690.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 1.00 2300.00 3247.50 3380.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 132.00 2600.00 2662.68 2757.95 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 3.00 3000.00 5493.20 6682.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 4.00 2800.00 3518.97 3460.11 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 7.00 2400.00 3078.29 2755.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 1.00 3000.00 3169.11 3177.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 15.00 2666.67 3719.92 3756.57 FBR060A-022 SH 60 over the South Platte 07/12/18 1.00 3500.00 3139.41 2900.00 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 2.00 4000.00 4183.42 3776.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 8.00 2200.00 3935.69 3450.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 2.00 2700.00 2735.05 3350.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 9.00 2700.00 3329.86 4500.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 2.00 2300.00 3706.36 3700.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 2.00 2750.00 3049.04 2910.00 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 1.00 2800.00 4333.50 6425.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 27.00 2655.56 3517.90 3885.07 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 17.00 2800.00 3064.76 2800.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 355 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-02003 End Anchor (Nonflared) Each =================================================== NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 7.00 2800.00 3828.18 3084.55 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 1.00 3000.00 3436.65 3300.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 6.00 3600.00 4168.47 4175.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 1.00 2000.00 3537.25 3522.75 ER052A-039 SH 170 11/15/18 4.00 3000.00 5668.84 4930.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 2.00 3304.58 4914.22 4914.22 C R500-198 R5 GUARDRAIL REPLACEMENT/UPGR 11/29/18 41.00 4000.00 3275.00 2850.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 27.00 2956.97 2956.97 2956.97 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 106.00 3360.82 3524.71 3087.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 280.00 2896.95 3108.16 3044.99 =============== 606-02005 End Anchor (Flared) Each =================================================== STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 35.00 2800.00 3172.45 4845.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 29.00 2000.00 2197.50 2325.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 4.00 2500.00 2597.10 2575.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 4.00 2500.00 2852.50 2260.00 STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 43.00 5000.00 3500.00 3500.00 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 20.00 2500.00 2490.90 3300.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 7.00 3800.00 4980.69 4800.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 2.00 2100.00 3446.85 3075.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 2.00 2400.00 3412.95 3000.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 2.00 2500.00 2790.00 2900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 148.00 3254.05 3052.90 3543.18 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 2.00 3000.00 4848.60 5791.00 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 4.00 2000.00 2810.41 2479.51 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 4.00 2750.00 2797.68 2500.00 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 20.00 2200.00 2519.49 2240.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 4.00 2800.00 2636.39 2585.81 FBR0705-087 I-70: EMERGENCY BRIDGE G-25-K 05/16/18 4.00 3600.00 3600.00 3600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 38.00 2489.47 2794.10 2659.03 FBR060A-022 SH 60 over the South Platte 07/12/18 1.00 2250.00 2509.66 2350.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 356 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-02005 End Anchor (Flared) Each =================================================== SHE0701-245 I-70 MEDIAN CABLE RAIL INSTAL 07/12/18 5.00 2500.00 2466.65 2466.65 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 2.00 3000.00 2748.29 2790.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 2.00 2800.00 2765.49 3500.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 2.00 2300.00 3247.59 3400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.00 2579.17 2796.70 2838.60 NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 1.00 2700.00 8271.00 10500.00 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 12.00 2800.00 3022.50 2545.00 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 11.00 2600.00 2722.36 2480.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 1.00 3550.00 3449.85 3084.55 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 3.00 3000.00 2741.06 2650.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 22.00 3500.00 3869.47 3560.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 5.00 2500.00 2912.42 2882.25 STA086A-051 SH 86; WEST OF I-70 11/29/18 2.00 3000.00 3046.48 3200.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 2.00 2700.00 2995.29 2818.90 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 45.00 2324.85 2324.85 2324.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 104.00 2720.85 3162.77 2776.36 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 302.00 2947.41 3021.79 3139.86 =============== 606-10200 Brdg Rail (Spec) Lin Foot =============================================== STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 5.00 100.00 698.68 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 100.00 698.68 400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 100.00 698.68 400.00 =============== 606-10305 Brdg Rail Ty 3 (Spec) Lin Foot =============================================== CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 702.00 316.75 265.00 265.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 702.00 316.75 265.00 265.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 702.00 316.75 265.00 265.00 =============== 606-10700 Brdg Rail Ty 7 Lin Foot =============================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 50.00 150.00 622.50 550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 50.00 150.00 622.50 550.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 357 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-10700 Brdg Rail Ty 7 Lin Foot =============================================== C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 2,450.00 84.81 84.81 84.81 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,450.00 84.81 84.81 84.81 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 3,748.00 89.87 89.87 89.87 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,748.00 89.87 89.87 89.87 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,248.00 88.37 96.36 91.57 =============== 606-10705 Brdg Rail Ty 7 (Spec) Lin Foot =============================================== BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 1,108.00 120.00 212.80 124.68 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,108.00 120.00 212.80 124.68 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1,672.00 124.89 124.89 124.89 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,672.00 124.89 124.89 124.89 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,780.00 122.94 197.21 124.81 =============== 606-11010 Brdg Rail Ty 10R Lin Foot =============================================== STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 274.00 300.00 263.16 265.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 1,629.00 140.00 131.98 125.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 487.00 200.00 130.33 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,390.00 170.57 144.55 144.11 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 846.00 200.00 214.79 230.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 846.00 200.00 214.79 230.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 358 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-11010 Brdg Rail Ty 10R Lin Foot =============================================== NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 138.00 210.00 165.73 164.38 STA086A-051 SH 86; WEST OF I-70 11/29/18 950.00 185.00 144.48 198.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,088.00 188.17 145.92 193.74 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,324.00 180.76 156.44 173.40 =============== 606-11015 Brdg Rail Ty 10R (Spec) Lin Foot =============================================== NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 314.00 200.00 151.07 165.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 1,082.00 225.00 165.04 245.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,396.00 219.38 162.40 227.01 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 120.00 275.00 268.21 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 120.00 275.00 268.21 300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,516.00 223.78 169.51 232.78 =============== 606-11020 Brdg Rail Ty 10H Lin Foot =============================================== C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 33.00 175.00 384.77 516.84 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 33.00 175.00 384.77 516.84 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 33.00 175.00 384.77 516.84 =============== 606-11030 Brdg Rail Ty 10M Lin Foot =============================================== STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 102.00 225.00 244.71 170.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 102.00 225.00 244.71 170.00 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 305.00 250.00 215.22 194.01 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 359 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-11030 Brdg Rail Ty 10M Lin Foot =============================================== FBR0705-087 I-70: EMERGENCY BRIDGE G-25-K 05/16/18 605.00 200.00 200.00 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 910.00 216.76 212.70 197.99 FBR060A-022 SH 60 over the South Platte 07/12/18 1,671.00 225.00 165.53 150.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 1,224.00 120.00 175.49 174.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 303.00 225.00 221.66 210.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 1,402.00 150.00 175.40 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,600.00 174.20 173.42 160.34 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 749.00 178.16 192.10 192.10 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 22.50 250.00 380.00 250.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 185.00 215.00 216.43 275.72 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 932.00 158.81 158.81 158.81 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,888.50 173.08 195.30 184.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,500.50 179.77 177.94 171.13 =============== 606-11032 Brdg Rail Ty 10M (Spec) Lin Foot =============================================== FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 1,294.00 220.00 278.20 250.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 394.00 182.30 215.34 73.24 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 1,465.00 220.00 272.45 243.88 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,153.00 215.29 266.28 225.07 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 129.00 250.00 316.65 361.61 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 129.00 250.00 316.65 361.61 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 22.50 350.00 567.00 500.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 179.00 250.00 250.50 312.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 201.50 261.17 293.48 333.66 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,483.50 219.23 268.61 236.41 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 360 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-20014 Tensioned Cable Barrier (TL-4) Lin Foot =============================================== STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 1,485.00 20.00 17.04 17.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,485.00 20.00 17.04 17.50 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 16,300.00 18.00 17.00 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16,300.00 18.00 17.00 16.00 SHE0701-245 I-70 MEDIAN CABLE RAIL INSTAL 07/12/18 6,662.00 17.50 17.05 17.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6,662.00 17.50 17.05 17.05 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 24,447.00 17.99 17.01 16.38 =============== 606-21010 End Anchor (Tens Cab Bar) Each =================================================== STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 2.00 5400.00 4900.00 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 5400.00 4900.00 5000.00 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 12.00 4000.00 9000.00 8000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12.00 4000.00 9000.00 8000.00 SHE0701-245 I-70 MEDIAN CABLE RAIL INSTAL 07/12/18 4.00 3500.00 4125.25 4125.25 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 14.00 9046.97 9046.97 9046.97 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 18.00 7814.31 7953.25 7953.25 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 4.00 2500.00 18654.50 20300.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 361 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-21010 End Anchor (Tens Cab Bar) Each =================================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 3.00 5431.37 5431.37 5431.37 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 7.00 3756.30 15048.19 13927.73 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 39.00 5788.50 9244.08 8888.53 =============== 606-99999 Gdrail Ty 7 (Precast) Lin Foot =============================================== STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 4,530.00 75.00 91.20 93.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4,530.00 75.00 91.20 93.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,530.00 75.00 91.20 93.00 =============== 607-00000 Line Post Each =================================================== SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 697.00 70.00 170.18 90.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 697.00 70.00 170.18 90.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 697.00 70.00 170.18 90.55 =============== 607-00005 End Post Each =================================================== ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 16.00 265.00 240.56 200.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR ER144A-002 SH 144 East and West of Goodr 03/08/18 14.00 225.00 166.88 160.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 30.00 246.33 193.67 181.33 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 18.00 220.00 327.65 196.79 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 16.00 250.00 193.33 190.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 4.00 300.00 325.98 358.93 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 38.00 241.05 302.65 211.00 FBR060A-022 SH 60 over the South Platte 07/12/18 17.00 28.00 208.61 200.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 362 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-00005 End Post Each =================================================== STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 2.00 220.00 297.04 156.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 19.00 48.21 214.29 195.39 BR1131-006 SH 113 AT MP 11.5 10/11/18 8.00 250.00 289.84 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8.00 250.00 289.84 250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 95.00 204.91 245.76 201.79 =============== 607-00010 Corner and Line Br Post Each =================================================== ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 14.00 350.00 308.28 225.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR ER144A-002 SH 144 East and West of Goodr 03/08/18 57.00 275.00 196.26 185.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 71.00 289.79 208.51 192.89 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 12.00 400.00 363.03 234.01 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 41.00 260.00 286.67 290.00 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 8.00 300.00 352.83 307.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 1.00 400.00 383.69 380.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 62.00 294.52 329.92 282.82 FBR060A-022 SH 60 over the South Platte 07/12/18 17.00 265.00 273.94 265.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 8.00 400.00 370.86 187.50 STA052A-040 SH 52: Antelope Creek 08/23/18 4.00 300.00 364.17 340.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 14.00 500.00 246.81 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 43.00 369.88 281.74 236.40 BR1131-006 SH 113 AT MP 11.5 10/11/18 6.00 325.00 331.13 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 325.00 331.13 250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 182.00 311.48 260.83 235.69 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 363 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-00015 End Post (Spec) Each =================================================== SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 156.00 300.00 1272.07 466.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 156.00 300.00 1272.07 466.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 156.00 300.00 1272.07 466.20 =============== 607-00020 Corner and Line Br Post (Spec) Each =================================================== STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 2.00 400.00 430.29 560.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 400.00 430.29 560.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 399.00 500.00 1487.90 713.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 399.00 500.00 1487.90 713.70 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 401.00 499.50 1473.95 712.93 =============== 607-00030 Br Post (Spec) Each =================================================== NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 4.00 1500.00 896.67 640.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 1500.00 896.67 640.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 1.00 600.00 447.18 378.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 600.00 447.18 378.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 1320.00 731.07 587.60 =============== 607-01000 Fence BW MP Lin Foot =============================================== ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 2,535.00 3.50 3.20 2.65 STA0342-060 US 34D OVERLAY AND BRIDGE WOR COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 364 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-01000 Fence BW MP Lin Foot =============================================== ER144A-002 SH 144 East and West of Goodr 03/08/18 16,638.00 3.00 2.15 1.80 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 50.00 10.00 11.09 19.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 19,223.00 3.08 2.24 1.96 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 1,810.00 2.65 5.13 2.66 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 1,528.00 8.00 2.76 2.25 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 275.00 20.00 6.65 7.26 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,613.00 6.23 4.60 2.84 STA052A-040 SH 52: Antelope Creek 08/23/18 283.00 7.50 6.31 5.35 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 2,449.00 8.00 3.01 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,732.00 7.95 3.20 3.24 BR1131-006 SH 113 AT MP 11.5 10/11/18 391.00 3.25 4.29 3.13 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 330.00 5.00 6.33 6.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1,272.00 2.09 2.09 2.09 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,993.00 2.80 4.55 2.94 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 27,561.00 3.96 2.69 2.27 =============== 607-01010 Fence BW MP (Spec) Lin Foot =============================================== FBR060A-022 SH 60 over the South Platte 07/12/18 2,103.00 3.00 2.60 2.05 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 1,340.00 5.00 4.58 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,443.00 3.78 3.14 3.59 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,443.00 3.78 3.14 3.59 =============== 607-01100 Fence BW TWP Lin Foot =============================================== STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 443.00 10.00 14.50 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 443.00 10.00 14.50 10.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 443.00 10.00 14.50 10.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 365 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-01110 Fence BW TWP (Spec) Lin Foot =============================================== NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 3,062.00 12.00 4.90 3.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,062.00 12.00 4.90 3.70 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,062.00 12.00 4.90 3.70 =============== 607-11200 Fence CW MP Lin Foot =============================================== BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 532.00 5.25 6.20 3.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 532.00 5.25 6.20 3.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 532.00 5.25 6.20 3.50 =============== 607-11300 Fence CW TWP Lin Foot =============================================== BR1131-006 SH 113 AT MP 11.5 10/11/18 169.00 20.00 8.95 3.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 169.00 20.00 8.95 3.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 169.00 20.00 8.95 3.75 =============== 607-11352 Fence Deer (Wire Mesh) Lin Foot =============================================== SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 11,153.00 8.00 8.78 5.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 11,153.00 8.00 8.78 5.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,153.00 8.00 8.78 5.35 =============== 607-11354 Fence Deer (Wooden Stays) Lin Foot =============================================== SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 16,729.00 4.00 3.80 2.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 16,729.00 4.00 3.80 2.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16,729.00 4.00 3.80 2.40 =============== 607-11360 Fence Deer (Spec) Lin Foot =============================================== SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 137,583.00 7.00 11.13 9.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 137,583.00 7.00 11.13 9.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 137,583.00 7.00 11.13 9.40 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 366 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-11450 Fence Split Cedar Lin Foot =============================================== FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 82.00 40.00 24.56 23.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 82.00 40.00 24.56 23.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 82.00 40.00 24.56 23.50 =============== 607-11455 Fence Wood Lin Foot =============================================== ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 140.00 30.00 34.56 30.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 140.00 30.00 34.56 30.00 FBR060A-022 SH 60 over the South Platte 07/12/18 56.00 32.00 52.15 64.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 56.00 32.00 52.15 64.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 196.00 30.57 41.16 39.80 =============== 607-11525 Fence (Plastic) Lin Foot =============================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 300.00 5.00 5.64 4.27 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 260.00 4.25 5.25 4.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 732.00 3.50 3.69 1.60 STA0342-060 US 34D OVERLAY AND BRIDGE WOR ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 500.00 3.50 2.75 2.60 CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 1,800.00 8.53 30.00 30.00 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 659.00 3.50 3.12 4.00 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 1,000.00 2.00 4.82 3.50 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 475.00 3.75 3.94 2.57 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 330.00 3.00 4.93 4.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 2,226.00 3.00 3.53 3.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 1,772.00 4.00 2.54 3.50 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 250.00 10.00 3.91 6.00 NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 170.00 5.00 5.00 8.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 500.00 2.00 4.52 4.04 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 1,500.00 9.21 8.50 8.50 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 400.00 5.00 3.38 2.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12,874.00 4.92 4.24 7.68 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 367 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-11525 Fence (Plastic) Lin Foot =============================================== NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 2,700.00 5.00 2.92 3.00 STAR400-347 Various intersections across 04/12/18 88.00 5.00 12.33 6.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 200.00 4.00 4.94 4.40 STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 16.00 5.00 7.98 5.00 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 120.00 4.00 5.21 10.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 500.00 4.00 5.62 10.96 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 500.00 25.00 12.00 12.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 500.00 5.00 4.17 3.75 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 1,000.00 5.00 8.53 8.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,624.00 6.63 4.96 5.82 NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 200.00 5.00 8.00 8.00 FBR060A-022 SH 60 over the South Platte 07/12/18 5,500.00 3.00 2.61 2.00 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 300.00 6.00 4.08 5.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 400.00 4.00 3.97 3.75 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 6,500.00 1.61 1.61 1.61 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 100.00 5.50 6.99 3.50 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 600.00 5.00 5.45 6.60 C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 200.00 5.00 7.63 5.00 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 500.00 4.00 5.44 7.00 NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 200.00 5.00 6.00 6.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 3,350.00 3.50 3.24 4.00 NHPP070A-032 I-70B & Z GRAND JCT PHASE 1 A 09/20/18 500.00 5.00 7.75 1.00 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 200.00 8.00 4.25 4.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 18,550.00 2.95 2.99 2.74 BR1131-006 SH 113 AT MP 11.5 10/11/18 480.00 5.00 4.78 3.13 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 300.00 5.50 4.50 4.00 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 6,300.00 3.00 4.24 4.15 NHPP0702-366 I-70 Avon to Vail 11/08/18 200.00 3.50 4.01 3.70 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 200.00 3.00 2.81 2.61 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 500.00 4.50 5.45 4.85 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 1,000.00 5.00 4.58 5.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 760.00 6.00 4.30 5.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 130.00 2.50 3.23 2.36 ER052A-039 SH 170 11/15/18 280.00 4.00 3.69 2.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 368 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-11525 Fence (Plastic) Lin Foot =============================================== C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 1,200.00 5.00 5.00 5.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 3,000.00 3.63 5.25 5.25 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 300.00 5.00 4.50 7.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 1,000.00 5.00 6.90 7.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 70.00 4.00 4.74 12.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 100.00 10.00 6.42 10.05 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 250.00 5.00 6.87 5.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 1,350.00 3.00 3.16 2.35 C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 200.00 5.00 8.00 5.00 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 200.00 5.00 3.02 2.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 3,245.00 3.00 2.44 1.27 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 600.00 5.00 2.73 4.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 15,200.00 1.61 1.61 1.61 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 36,865.00 2.89 3.85 3.03 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 73,913.00 3.54 3.66 3.98 =============== 607-11530 Fence (Spec) Lin Foot =============================================== NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 127.00 55.00 22.00 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 127.00 55.00 22.00 21.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 50.00 30.00 341.58 162.84 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 50.00 30.00 341.58 162.84 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 177.00 47.94 185.68 61.07 =============== 607-11580 Fence (Temp) Lin Foot =============================================== STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 210.00 8.25 8.35 6.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 210.00 8.25 8.35 6.50 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 1,624.00 5.00 5.90 5.11 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 4,706.00 3.00 2.67 2.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 369 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-11580 Fence (Temp) Lin Foot =============================================== FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 1,415.00 6.00 4.32 4.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7,745.00 3.97 4.38 3.15 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 240.00 3.00 14.06 20.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 1,900.00 2.00 4.79 3.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,140.00 2.11 5.41 5.35 BR1131-006 SH 113 AT MP 11.5 10/11/18 609.00 5.00 7.86 3.75 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 1,620.00 10.00 5.38 5.64 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 500.00 10.00 17.20 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,729.00 8.88 9.01 5.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12,824.00 4.77 5.64 4.10 =============== 607-11581 Fence (Temp) (Spec) Lin Foot =============================================== ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 474.00 3.80 9.69 3.50 STA0342-060 US 34D OVERLAY AND BRIDGE WOR -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 474.00 3.80 9.69 3.50 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 400.00 20.00 9.54 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 400.00 20.00 9.54 10.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 874.00 11.21 9.62 6.47 =============== 607-15000 Fence Conc (Sound) Sq Foot ================================================ NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 120.00 25.00 79.50 69.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 120.00 25.00 79.50 69.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 120.00 25.00 79.50 69.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 370 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-15015 Fence Conc (Sound) (Inst) Sq Foot ================================================ NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 1,350.00 25.00 40.50 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,350.00 25.00 40.50 16.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,350.00 25.00 40.50 16.00 =============== 607-20110 Glare Screen (Special) Lin Foot =============================================== NHPP0702-366 I-70 Avon to Vail 11/08/18 200.00 50.00 190.17 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 200.00 50.00 190.17 25.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 200.00 50.00 190.17 25.00 =============== 607-53005 Fence CL (Spec) Lin Foot =============================================== STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 160.00 120.00 170.60 175.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 120.00 90.00 330.53 283.18 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 280.00 107.14 261.37 221.36 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 270.00 212.14 213.41 213.41 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 270.00 212.14 213.41 213.41 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 550.00 158.69 253.97 217.46 =============== 607-53136 Fence CL (36 In) Lin Foot =============================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 59.60 60.00 45.26 15.52 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 59.60 60.00 45.26 15.52 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 59.60 60.00 45.26 15.52 =============== 607-53137 Fence CL (Spec) (36 In) Lin Foot =============================================== NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 37.00 105.00 118.49 245.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 37.00 105.00 118.49 245.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 371 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-53137 Fence CL (Spec) (36 In) Lin Foot =============================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1,233.00 51.22 51.22 51.22 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,233.00 51.22 51.22 51.22 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,270.00 52.79 58.43 56.87 =============== 607-53161 Fence CL (Spec) (60 In) Lin Foot =============================================== FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 210.00 60.00 167.01 147.04 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 210.00 60.00 167.01 147.04 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 290.00 147.11 112.04 112.04 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 290.00 147.11 112.04 112.04 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 500.00 110.52 157.95 126.74 =============== 607-55041 Mesh Anchor Lin Foot =============================================== ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 3,861.00 53.26 60.00 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,861.00 53.26 60.00 60.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,861.00 53.26 60.00 60.00 =============== 607-55100 Wire Mesh Sq Foot ================================================ STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 39,000.00 11.38 10.89 10.62 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 39,000.00 11.38 10.89 10.62 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 39,000.00 11.38 10.89 10.62 =============== 607-55103 Cable Net (Spec) Sq Foot ================================================ ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 8,593.00 105.82 97.00 97.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8,593.00 105.82 97.00 97.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,593.00 105.82 97.00 97.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 372 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-56001 Fence (Animal Protect) Lin Foot =============================================== FBR060A-022 SH 60 over the South Platte 07/12/18 675.00 8.00 8.22 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 675.00 8.00 8.22 8.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 675.00 8.00 8.22 8.00 =============== 607-60002 Game Ramp Each =================================================== SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 45.00 8000.00 14926.67 7080.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 45.00 8000.00 14926.67 7080.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 45.00 8000.00 14926.67 7080.00 =============== 607-60110 10 Ft Gate Each =================================================== FBR060A-022 SH 60 over the South Platte 07/12/18 1.00 1000.00 316.91 290.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1000.00 316.91 290.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1000.00 316.91 290.00 =============== 607-60116 16 Ft Gate Each =================================================== ER144A-002 SH 144 East and West of Goodr 03/08/18 4.00 1250.00 394.36 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 1250.00 394.36 300.00 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 2.00 600.00 1160.47 638.23 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 2.00 1500.00 490.24 467.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 1050.00 862.59 552.87 FBR060A-022 SH 60 over the South Platte 07/12/18 1.00 1200.00 420.48 385.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1200.00 420.48 385.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 1155.56 589.47 421.83 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 373 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-60120 20 Ft Gate Each =================================================== ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 2.00 1200.00 759.80 620.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1200.00 759.80 620.00 FBR060A-022 SH 60 over the South Platte 07/12/18 3.00 1500.00 582.69 570.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 1500.00 582.69 570.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 1380.00 621.19 590.00 =============== 607-60121 20 Ft Gate (Spec) Each =================================================== SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 5.00 1500.00 2449.40 1748.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 1500.00 2449.40 1748.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 1500.00 2449.40 1748.20 =============== 607-60153 3 Ft Gate (Spec) Each =================================================== SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 30.00 1000.00 2089.17 1367.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 30.00 1000.00 2089.17 1367.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 1000.00 2089.17 1367.50 =============== 607-60320 20 Ft Gate Twin Each =================================================== ER144A-002 SH 144 East and West of Goodr 03/08/18 3.00 1500.00 641.87 375.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 1500.00 641.87 375.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 1500.00 641.87 375.00 =============== 607-60324 24 Ft Gate Twin Each =================================================== ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 2.00 1200.00 1289.20 1350.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 374 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 607-60324 24 Ft Gate Twin Each =================================================== STA0342-060 US 34D OVERLAY AND BRIDGE WOR -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1200.00 1289.20 1350.00 FBR060A-022 SH 60 over the South Platte 07/12/18 2.00 2950.00 664.65 630.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 2950.00 664.65 630.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 2075.00 848.34 990.00 =============== 607-60620 Road Closure Gate Each =================================================== NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 1.00 6000.00 14532.00 12064.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 6000.00 14532.00 12064.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 4.00 15000.00 15329.33 14700.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 2.00 20475.00 20475.00 20475.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 16825.00 16064.43 16625.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 15278.57 15872.88 15973.43 =============== 607-60625 Road Closure Gate (Install Only) Each =================================================== NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 3.00 10000.00 6542.50 5144.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 10000.00 6542.50 5144.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 10000.00 6542.50 5144.00 =============== 608-00000 Conc Sidewalk Sq Yard ================================================ FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 14.00 120.00 250.33 350.65 STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 133.00 50.00 282.50 260.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 31.00 55.00 68.41 70.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 375 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 608-00000 Conc Sidewalk Sq Yard ================================================ STA0342-060 US 34D OVERLAY AND BRIDGE WOR STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 139.00 112.00 87.17 51.50 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 30.00 75.00 104.14 190.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 359.00 75.00 60.00 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 706.00 77.59 108.10 110.27 NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPL 04/05/18 10.00 75.00 220.33 295.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 290.00 67.00 53.01 51.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 128.00 75.00 65.91 98.62 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 428.00 69.58 58.10 70.94 NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 100.00 70.00 60.00 60.00 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 90.00 80.00 60.05 59.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 292.00 55.00 71.71 80.00 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 464.00 70.00 86.50 55.00 STM0252-469 R2 ADA RAMPS I-25 INT S NEV- 09/06/18 521.00 57.00 81.00 61.00 NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 456.00 70.00 69.00 69.00 NHPP070A-032 I-70B & Z GRAND JCT PHASE 1 A 09/20/18 256.00 70.00 76.75 68.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,179.00 65.29 78.33 64.64 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 16.00 75.00 69.75 65.50 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 1,039.00 62.00 79.87 76.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 15.00 110.00 165.50 80.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 203.00 73.00 63.63 58.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 7.00 200.00 249.61 123.83 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 9,991.00 39.00 54.71 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 11,271.00 41.98 58.96 65.95 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14,584.00 48.00 62.27 68.04 =============== 608-00005 Conc Sidewalk (Spec) Sq Yard ================================================ STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 20.00 125.00 151.13 310.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 125.00 151.13 310.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 376 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 608-00005 Conc Sidewalk (Spec) Sq Yard ================================================ C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 120.00 60.00 150.00 150.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 643.00 73.59 67.77 67.77 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 169.00 73.00 152.63 118.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 932.00 71.73 114.49 87.47 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 952.00 72.85 118.16 92.14 =============== 608-00006 Conc Sidewalk (6 In) Sq Yard ================================================ STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 141.00 65.00 68.21 75.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 173.00 65.00 53.39 55.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 314.00 65.00 57.68 63.98 STAR400-347 Various intersections across 04/12/18 55.00 100.00 231.51 334.54 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 766.00 53.00 64.72 89.86 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 513.00 150.00 130.00 130.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 30.00 65.00 97.58 106.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,364.00 91.64 81.41 115.18 C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 173.00 66.00 91.38 58.00 M850-027 US24E MANITOU AVE. AT RUXTON 08/28/18 30.00 60.00 166.19 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 203.00 65.11 102.43 86.37 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 159.00 66.00 72.28 69.50 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1,368.00 67.36 67.77 67.77 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 872.00 100.00 85.00 82.09 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 1,266.00 55.00 82.43 80.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 22.00 125.00 87.41 95.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 377 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 608-00006 Conc Sidewalk (6 In) Sq Yard ================================================ C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 284.00 70.00 81.80 70.00 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 465.00 75.00 68.18 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,436.00 71.46 78.49 73.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,317.00 75.29 78.06 82.51 =============== 608-00010 Conc Curb Ramp Sq Yard ================================================ FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 277.00 300.00 254.48 283.96 STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 761.00 150.00 233.15 220.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 35.00 135.00 108.07 100.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 228.00 145.00 100.25 94.00 STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 36.00 211.00 165.83 72.50 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 748.00 130.00 96.56 112.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 14.00 180.00 225.78 440.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 250.00 200.00 165.00 145.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,349.00 167.05 132.74 170.20 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 100.00 150.00 139.80 170.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 730.00 125.00 161.40 235.60 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 493.00 150.00 150.00 150.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 25.00 125.00 161.67 121.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,348.00 136.00 156.86 197.31 NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 458.00 150.00 115.00 115.00 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 111.00 140.00 138.75 135.00 C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 670.00 142.00 170.00 145.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 322.00 140.00 167.91 200.00 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 1,991.00 150.00 161.25 155.00 STM0252-469 R2 ADA RAMPS I-25 INT S NEV- 09/06/18 1,243.00 150.00 140.00 90.00 NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 610.00 120.00 138.00 138.00 NHPP070A-032 I-70B & Z GRAND JCT PHASE 1 A 09/20/18 761.00 120.00 118.00 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6,166.00 141.76 153.88 132.59 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 23.00 150.00 109.50 104.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 378 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 608-00010 Conc Curb Ramp Sq Yard ================================================ FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 191.00 130.00 160.36 145.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 192.00 150.00 245.71 148.00 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 379.00 247.00 178.00 178.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 516.00 175.25 175.46 175.46 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 1,505.00 200.00 233.16 187.64 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 388.00 120.00 205.80 195.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 585.00 160.00 98.34 111.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 4.00 250.00 635.36 796.07 C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 680.00 160.00 171.87 177.35 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 2,074.00 135.00 153.83 200.00 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 11.00 175.00 156.14 88.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6,548.00 164.02 180.04 180.06 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16,411.00 153.79 162.13 162.23 =============== 608-00012 Curb Ramp (Spec) Sq Yard ================================================ STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 7.00 271.00 218.75 105.00 STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 18.00 365.00 305.33 121.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 25.00 338.68 275.77 116.52 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25.00 338.68 275.77 116.52 =============== 608-00015 Detectable Warnings Sq Foot ================================================ ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 35.00 65.00 50.92 40.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 406.00 71.00 48.88 57.50 STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 140.00 121.00 82.75 62.25 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 205.00 75.00 34.19 40.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 16.00 50.00 93.98 220.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 802.00 80.07 47.94 56.33 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 171.00 60.00 51.04 30.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 124.00 66.00 78.59 164.37 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 56.00 70.00 67.92 48.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 351.00 63.72 60.80 80.46 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 379 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 608-00015 Detectable Warnings Sq Foot ================================================ C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 34.00 60.00 89.00 100.00 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 102.00 95.00 87.50 85.00 STM0252-469 R2 ADA RAMPS I-25 INT S NEV- 09/06/18 552.00 74.00 104.00 83.00 NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 20.00 100.00 220.00 220.00 NHPP070A-032 I-70B & Z GRAND JCT PHASE 1 A 09/20/18 588.00 100.00 63.25 76.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,296.00 87.48 84.88 82.54 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 227.00 50.00 50.93 35.00 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 412.00 70.00 113.64 105.55 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 803.00 80.00 37.98 45.00 C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 8.00 60.00 121.00 150.00 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 40.00 75.00 34.00 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,490.00 72.42 59.77 60.51 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,939.00 78.16 61.47 68.69 =============== 608-00026 Conc Bikeway (6 In) Sq Yard ================================================ FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 65.00 75.00 64.22 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 65.00 75.00 64.22 55.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 65.00 75.00 64.22 55.00 =============== 608-00050 Brick Pavers Sq Foot ================================================ NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 65.00 60.00 50.00 50.00 NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 70.00 50.00 59.00 59.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 135.00 54.81 54.67 54.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 135.00 54.81 54.67 54.67 =============== 608-01500 Bitum Bikeway Ton ==================================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 362.00 137.88 141.89 141.89 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 362.00 137.88 141.89 141.89 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 362.00 137.88 141.89 141.89 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 380 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 608-01550 Place Asph Millings Sq Yard ================================================ ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 4,490.00 7.00 5.27 4.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 490.00 25.00 11.88 9.76 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,980.00 8.77 5.55 4.57 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,980.00 8.77 5.55 4.57 =============== 608-10000 Sidewalk Drain Lin Foot =============================================== NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 13.00 150.00 200.00 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 13.00 150.00 200.00 200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13.00 150.00 200.00 200.00 =============== 608-10010 Sidewalk Drain Each =================================================== STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 1.00 3000.00 3312.78 4588.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 3000.00 3312.78 4588.35 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 7.00 1500.00 2521.00 1018.92 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 7.00 1500.00 2521.00 1018.92 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 1687.50 2597.62 1465.10 =============== 609-20010 Curb Ty 2 B Lin Foot =============================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 56.00 30.00 121.75 93.50 STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 20.00 25.00 48.43 45.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 5.00 50.00 57.68 75.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 74.00 25.00 53.86 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 155.00 27.61 67.54 89.75 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 381 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 609-20010 Curb Ty 2 B Lin Foot =============================================== STAR400-347 Various intersections across 04/12/18 30.50 50.00 179.78 363.34 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 79.00 30.00 50.00 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 109.50 35.57 119.65 137.28 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 80.00 120.00 88.00 88.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 289.00 43.64 44.66 44.66 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 8.00 27.00 66.60 27.00 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 6.00 23.08 105.15 125.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 452.00 25.00 34.03 28.18 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 835.00 40.56 38.84 40.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,099.50 38.24 48.79 56.93 =============== 609-21010 C and G Ty 2 I-B Lin Foot =============================================== STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 219.00 20.00 27.44 23.25 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 285.00 22.00 34.51 25.67 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 13.00 29.00 41.81 35.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 760.00 19.00 23.50 28.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,277.00 19.94 29.58 26.74 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 203.00 20.00 33.11 39.45 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 764.00 55.00 50.00 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 967.00 47.65 41.30 47.79 C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 63.00 35.00 44.50 30.00 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 605.00 36.00 37.50 25.00 STM0252-469 R2 ADA RAMPS I-25 INT S NEV- 09/06/18 234.00 18.00 36.73 28.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 902.00 31.26 37.95 26.24 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 382 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 609-21010 C and G Ty 2 I-B Lin Foot =============================================== FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 665.00 27.00 26.20 23.40 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 182.00 35.00 40.08 28.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 3,366.00 44.70 44.66 44.66 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 29.00 20.00 47.52 30.49 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 287.00 30.00 30.63 40.00 C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 78.00 40.00 41.40 38.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 8,259.00 22.00 20.11 18.38 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 31.00 40.00 42.43 38.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 12,897.00 28.69 23.70 26.31 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16,043.00 29.28 25.60 27.63 =============== 609-21011 C and G Ty 2 I-M Lin Foot =============================================== SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 2,243.00 20.00 24.00 25.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 5,058.00 30.00 22.56 25.25 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 242.00 32.00 26.00 31.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7,543.00 27.09 22.98 25.36 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 2,975.00 20.00 22.99 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,975.00 20.00 22.99 18.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10,518.00 25.08 22.98 23.28 =============== 609-21013 C and G Ty 2 I-M (Spec) Lin Foot =============================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 30.00 50.00 48.93 46.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 30.00 50.00 48.93 46.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 310.00 20.00 35.88 32.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 310.00 20.00 35.88 32.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 340.00 22.65 36.28 33.24 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 383 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 609-21020 C and G Ty 2 II-B Lin Foot =============================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 126.00 40.00 108.53 92.06 STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 290.00 40.00 56.68 55.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 48.00 30.00 30.00 25.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 260.00 25.00 36.42 50.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 548.00 30.00 28.31 26.25 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 1,259.00 22.00 33.57 29.79 STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 282.00 125.00 35.92 26.75 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 130.00 40.00 32.06 25.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 1,457.00 40.00 30.00 31.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,400.00 38.06 34.34 34.00 STAR400-347 Various intersections across 04/12/18 25.50 40.00 202.21 412.64 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 266.00 27.00 40.58 49.31 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 715.00 60.00 52.00 52.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 121.00 30.00 46.67 28.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,127.50 48.54 50.83 56.95 NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 23.00 35.00 35.00 35.00 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 135.00 40.00 45.75 45.00 C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 460.00 40.00 43.50 28.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 1,295.00 25.00 41.90 45.00 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 308.00 35.00 39.25 29.00 STM0252-469 R2 ADA RAMPS I-25 INT S NEV- 09/06/18 741.00 25.00 44.00 42.00 NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 451.00 35.00 37.00 37.00 NHPP070A-032 I-70B & Z GRAND JCT PHASE 1 A 09/20/18 115.00 35.00 36.83 33.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,528.00 30.07 41.93 39.28 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 3,157.00 30.00 38.30 33.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 186.00 40.00 40.38 29.00 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 297.00 50.00 52.00 52.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 5,135.00 35.96 36.04 36.04 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 1,451.00 25.00 38.83 34.01 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 384 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 609-21020 C and G Ty 2 II-B Lin Foot =============================================== STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 2,095.00 24.00 53.40 30.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 1,165.00 26.50 34.16 44.00 C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 184.00 42.00 43.20 40.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 17,237.00 23.00 24.92 20.83 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 30,907.00 26.64 31.76 27.18 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 39,962.50 28.82 33.07 29.84 =============== 609-21021 C and G Ty 2 II-M Lin Foot =============================================== SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 167.00 25.00 30.33 27.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 2,058.00 22.00 25.36 26.45 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 235.00 40.00 31.81 28.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 229.00 50.00 34.50 39.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,689.00 26.14 27.06 27.69 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 1,545.00 27.00 27.13 23.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,545.00 27.00 27.13 23.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 103.00 35.00 54.25 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 103.00 35.00 54.25 60.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 94.00 45.00 45.25 40.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 530.00 37.36 37.36 37.36 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 624.00 38.51 41.43 37.76 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,961.00 28.15 28.32 28.17 =============== 609-21023 C and G Ty 2 II-B (Spec) Lin Foot =============================================== ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 20.00 45.00 108.19 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 20.00 45.00 108.19 40.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 45.00 108.19 40.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 385 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 609-22021 CGS Ty 2 MS Lin Foot =============================================== NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 11.00 75.00 61.00 61.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 11.00 75.00 61.00 61.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 75.00 61.00 61.00 =============== 609-22022 CGS Ty 2 II-B Lin Foot =============================================== STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 209.00 26.50 44.94 64.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 209.00 26.50 44.94 64.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 209.00 26.50 44.94 64.00 =============== 609-23000 Gutter (Special) Lin Foot =============================================== BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 16.00 45.00 72.65 23.53 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16.00 45.00 72.65 23.53 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 45.00 72.65 23.53 =============== 609-24000 Gutter Ty 2 (Spec) Lin Foot =============================================== NHPP0761-230 I-76 AND COUNTY ROAD 22 AT FO 06/14/18 490.00 39.96 54.97 28.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 490.00 39.96 54.97 28.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 170.00 45.00 64.67 44.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 170.00 45.00 64.67 44.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 660.00 41.26 57.76 32.12 =============== 609-24002 Gutter Ty 2 (2 Ft) Lin Foot =============================================== NH0242-071 US 24 & 31ST STREET and US24 05/03/18 72.00 25.00 31.26 29.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 386 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 609-24002 Gutter Ty 2 (2 Ft) Lin Foot =============================================== STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 25.00 35.00 63.92 32.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 97.00 27.58 36.09 29.77 ER052A-039 SH 170 11/15/18 81.00 30.00 36.56 31.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 270.00 42.11 40.34 40.34 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 12,294.00 24.49 24.49 24.49 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 12,645.00 24.90 25.20 24.87 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12,742.00 24.92 25.61 24.91 =============== 609-24003 Gutter Ty 2 (3 Ft) Lin Foot =============================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 100.00 44.16 40.34 40.34 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 20.00 50.00 85.25 48.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 80.00 50.00 42.65 32.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 80.00 40.00 43.32 40.43 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 280.00 45.06 47.70 38.53 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 280.00 45.06 47.70 38.53 =============== 609-24004 Gutter Ty 2 (4 Ft) Lin Foot =============================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 223.00 35.00 116.63 83.26 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 169.00 45.00 35.71 45.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 392.00 39.31 63.67 66.77 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 200.00 35.00 84.33 63.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 427.00 53.00 49.42 38.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 885.00 33.00 46.73 42.88 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,512.00 38.91 53.48 44.16 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,904.00 38.99 55.23 48.82 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 387 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 609-24006 Gutter Ty 2 (6 Ft) Lin Foot =============================================== ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 108.00 62.00 50.37 60.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 108.00 62.00 50.37 60.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 127.00 70.00 70.40 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 127.00 70.00 70.40 80.00 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 94.00 50.00 127.30 95.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 94.00 50.00 127.30 95.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 329.00 61.66 80.89 77.72 =============== 609-24008 Gutter Ty 2 (8 Ft) Lin Foot =============================================== STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 200.00 75.00 80.40 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 200.00 75.00 80.40 90.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 1,071.00 55.00 86.40 95.57 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,071.00 55.00 86.40 95.57 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,271.00 58.15 85.45 94.69 =============== 609-40010 Curb Ty 4 B Lin Foot =============================================== STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 8.00 20.00 143.00 56.98 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 20.00 143.00 56.98 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 20.00 143.00 56.98 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 388 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 609-40041 Curb Ty 4 (Special)(Sloping) Lin Foot =============================================== NHPP0703-436 EJMT PLENUM WATERPROOFING MEM 06/28/18 500.00 34.00 90.00 95.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 500.00 34.00 90.00 95.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 500.00 34.00 90.00 95.00 =============== 609-40042 Curb Ty 4 (Special)(Vertical) Lin Foot =============================================== STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 40.00 30.00 41.50 50.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 376.00 15.00 26.21 23.64 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 416.00 16.44 27.09 26.17 NHPP0703-436 EJMT PLENUM WATERPROOFING MEM 06/28/18 250.00 28.00 93.00 95.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 250.00 28.00 93.00 95.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 666.00 20.78 37.10 52.01 =============== 609-40130 Curb Median Special Lin Foot =============================================== FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 370.00 25.00 40.25 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 370.00 25.00 40.25 30.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 370.00 25.00 40.25 30.00 =============== 609-60011 Curb Ty 6 M Lin Foot =============================================== NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 25.00 25.00 102.75 55.00 ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 605.00 20.00 16.72 10.00 ER1151-033 PR SH 115-MP 34.7 01/25/18 1,278.00 13.00 8.73 9.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 20.00 10.00 65.56 100.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 3,229.00 10.00 10.70 10.94 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 67.00 20.00 43.63 23.63 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 389 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 609-60011 Curb Ty 6 M Lin Foot =============================================== FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 18.00 20.00 43.35 100.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 6,410.00 11.00 18.07 16.25 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 110.00 40.00 33.17 34.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 252.00 20.00 27.83 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12,014.00 11.94 16.28 15.31 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 92.00 35.00 35.00 15.96 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 613.00 20.00 15.24 14.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 705.00 21.96 18.36 14.99 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 50.00 65.00 32.32 26.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 1,715.00 23.00 10.38 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,765.00 24.19 10.61 10.45 NHPP0702-366 I-70 Avon to Vail 11/08/18 150.00 20.00 37.33 40.00 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 603.00 15.00 12.00 13.00 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 36.00 36.00 47.96 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 789.00 16.91 22.91 19.82 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15,273.00 14.08 15.57 14.97 =============== 609-71000 Curb (Special) Lin Foot =============================================== C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 18.00 30.00 57.00 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 18.00 30.00 57.00 55.00 C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 68.00 40.00 49.00 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 68.00 40.00 49.00 30.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 86.00 37.91 50.40 35.23 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 390 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 610-00010 Median Cover Matl (Dec) Sq Foot ================================================ NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 703.00 7.00 16.00 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 703.00 7.00 16.00 12.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 703.00 7.00 16.00 12.00 =============== 610-00020 Median Cover (Pattern Conc) Sq Foot ================================================ NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 2,081.00 15.00 16.00 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,081.00 15.00 16.00 12.00 NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPL 04/05/18 20.00 20.00 97.00 129.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20.00 20.00 97.00 129.00 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 386.00 20.00 25.00 26.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 386.00 20.00 25.00 26.00 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 3,640.00 13.00 14.65 11.50 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 964.00 15.00 15.29 15.00 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 3,560.00 10.00 17.50 14.08 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 35,395.00 9.00 10.61 12.50 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 38.00 50.00 36.14 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 43,597.00 9.58 11.75 12.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 46,084.00 9.92 11.99 12.74 =============== 610-00024 Median Cover (4 In Pattern Conc) Sq Foot ================================================ NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 15,499.00 15.01 15.42 15.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 15,499.00 15.01 15.42 15.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15,499.00 15.01 15.42 15.42 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 391 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 610-00026 Median Cover (6 In Pattern Conc) Sq Foot ================================================ FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 212.00 20.00 35.81 21.62 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 212.00 20.00 35.81 21.62 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 8,751.00 10.00 11.73 8.50 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 2,186.00 30.00 40.00 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10,937.00 14.00 12.86 14.80 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 372.00 36.00 25.00 25.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 18.00 30.00 51.52 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 390.00 35.72 29.30 26.38 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,539.00 14.84 13.16 15.31 =============== 610-00030 Median Cover Matl (Conc) Sq Foot ================================================ SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 1,629.00 11.00 12.67 12.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 3,732.00 11.00 12.63 14.50 STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 75.00 112.00 32.73 17.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,436.00 12.39 12.86 13.79 C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 950.00 12.00 17.38 15.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 472.00 15.00 19.33 16.00 M850-027 US24E MANITOU AVE. AT RUXTON 08/28/18 200.00 60.00 30.93 44.00 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 2,294.00 6.00 13.75 7.00 STM0252-469 R2 ADA RAMPS I-25 INT S NEV- 09/06/18 521.00 7.00 17.00 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,437.00 10.79 16.23 12.28 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 71.00 20.00 34.60 29.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 392 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 610-00030 Median Cover Matl (Conc) Sq Foot ================================================ C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 418.00 15.00 17.10 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 489.00 15.73 19.64 17.03 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10,362.00 11.87 14.72 13.29 =============== 610-00035 Median Cover Matl (Conc)(Spec) Sq Foot ================================================ STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 706.00 20.00 17.41 17.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 706.00 20.00 17.41 17.65 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 167.00 20.00 22.50 20.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 4,675.00 20.00 15.91 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,842.00 20.00 16.24 11.31 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,548.00 20.00 16.39 12.12 =============== 610-00050 Median Cover Matl (Stone) Ton ==================================================== STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 20.00 110.00 143.00 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 20.00 110.00 143.00 150.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 110.00 143.00 150.00 =============== 611-00025 24 Ft Deer Gd Each =================================================== SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 1.00 45000.00 51421.67 58265.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 45000.00 51421.67 58265.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 45000.00 51421.67 58265.00 =============== 611-00029 28 Ft Deer Gd Each =================================================== SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 4.00 50000.00 57315.47 71946.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 50000.00 57315.47 71946.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 50000.00 57315.47 71946.40 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 393 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 611-00033 32 Ft Deer Gd Each =================================================== SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 3.00 56000.00 64533.27 81599.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 56000.00 64533.27 81599.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 56000.00 64533.27 81599.80 =============== 612-00001 Delin (Ty I) Each =================================================== STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 476.00 25.00 16.83 15.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 431.00 24.00 24.36 23.75 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 50.00 25.00 23.50 23.00 STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 15.00 24.00 29.00 29.00 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 2.00 45.00 32.43 20.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 3.00 45.00 26.53 22.87 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 145.00 22.00 21.82 23.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 10.00 45.00 24.70 14.87 ER144A-002 SH 144 East and West of Goodr 03/08/18 100.00 30.00 74.33 105.00 NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 351.00 24.00 19.93 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,583.00 24.73 28.41 25.54 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 19.00 24.00 52.07 193.27 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 40.00 25.00 27.00 27.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 4.00 30.00 36.40 18.70 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 13.00 27.05 26.72 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 76.00 25.36 37.09 67.10 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 1.00 25.00 54.17 34.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 4.00 25.00 28.14 25.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 16.00 24.00 25.20 24.60 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 25.00 50.00 30.00 25.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 93.00 36.00 16.90 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 139.00 36.74 20.06 21.67 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 163.00 24.00 20.50 20.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 394 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00001 Delin (Ty I) Each =================================================== NHPP0401-023 US 40 ELK SPRINGS 10/25/18 10.00 30.00 40.47 25.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 625.00 25.00 19.27 15.61 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 36.00 25.00 81.26 44.65 NHPP0702-366 I-70 Avon to Vail 11/08/18 100.00 22.00 21.99 24.00 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 490.00 23.00 23.50 21.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 1.00 100.00 24.67 28.00 C R500-198 R5 GUARDRAIL REPLACEMENT/UPGR 11/29/18 34.00 30.00 30.00 30.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 360.00 25.00 21.39 21.11 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 137.00 25.00 21.63 18.00 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 462.00 25.00 14.45 15.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 393.00 14.92 14.92 14.92 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,811.00 23.18 21.14 18.31 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,609.00 24.16 24.93 21.70 =============== 612-00002 Delin (Ty II) Each =================================================== STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 49.00 26.00 26.89 24.75 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 10.00 27.00 24.50 24.00 STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 15.00 26.00 31.00 31.00 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 4.00 28.00 24.34 24.00 NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 95.00 20.00 23.27 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 173.00 22.81 24.65 25.37 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 2.00 28.00 33.80 32.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 18.00 30.71 28.45 24.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20.00 30.44 28.90 24.80 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 150.00 26.00 21.50 21.00 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 50.00 32.00 44.11 27.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 159.00 25.00 20.32 16.65 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 62.00 28.00 87.39 47.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 50.00 24.00 23.29 25.00 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 71.00 25.00 26.00 25.00 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 10.00 25.00 58.33 32.51 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 139.00 30.00 23.57 20.00 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 179.00 25.00 16.80 18.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 395 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00002 Delin (Ty II) Each =================================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 169.00 17.05 17.05 17.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,039.00 24.99 29.94 21.46 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,232.00 24.77 28.98 22.06 =============== 612-00003 Delin (Ty III) Each =================================================== STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 170.00 30.00 18.75 17.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 101.00 28.00 31.73 26.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 30.00 29.00 31.25 25.00 STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 15.00 28.00 32.00 32.00 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 8.00 26.00 49.01 41.75 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 3.00 45.00 30.44 27.23 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 4.00 30.00 26.85 25.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 4.00 45.00 27.60 22.30 ER144A-002 SH 144 East and West of Goodr 03/08/18 3.00 35.00 173.84 125.00 NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 40.00 30.00 26.90 29.00 NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 2.00 45.00 61.33 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 380.00 29.62 28.72 23.70 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 6.00 26.00 35.84 17.95 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 4.00 34.00 40.00 37.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 4.00 50.00 42.85 25.30 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 1.00 34.32 31.01 26.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 15.00 35.09 38.20 25.53 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 1.00 40.00 59.33 37.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 4.00 30.00 35.28 25.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 32.00 28.00 26.93 26.80 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 28.00 66.00 93.79 35.00 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 5.00 55.00 55.00 35.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 35.00 36.00 19.43 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 105.00 42.28 45.16 27.47 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 54.00 28.00 22.50 22.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 396 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00003 Delin (Ty III) Each =================================================== NHPP0401-023 US 40 ELK SPRINGS 10/25/18 10.00 34.00 47.49 29.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 103.00 24.00 22.04 18.73 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 10.00 30.00 93.85 50.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 10.00 26.00 25.15 26.00 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 5.00 30.00 29.00 29.00 C R500-198 R5 GUARDRAIL REPLACEMENT/UPGR 11/29/18 6.00 33.00 36.50 35.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 35.00 26.00 23.42 23.12 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 30.00 32.00 25.12 22.00 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 88.00 26.00 19.48 22.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 75.00 18.12 18.12 18.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 426.00 25.23 26.08 21.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 926.00 29.13 30.17 23.28 =============== 612-00010 Delin (Spec) Each =================================================== ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 20.00 100.00 66.17 87.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 100.00 66.17 87.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 100.00 66.17 87.00 =============== 612-00022 Delin (Ty II) (Barrier) Each =================================================== FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 8.00 32.00 33.80 22.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 10.00 32.00 35.84 21.78 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 4.00 21.00 48.50 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 22.00 30.00 36.01 26.99 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 197.00 61.82 61.82 61.82 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 197.00 61.82 61.82 61.82 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 523.00 25.00 41.99 57.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 276.00 61.82 61.82 61.82 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 799.00 37.72 44.30 58.66 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,018.00 42.22 45.22 58.59 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 397 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00023 Delin (Ty III) (Barrier) Each =================================================== C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 4.00 66.10 66.10 66.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 66.10 66.10 66.10 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 4.00 66.10 66.10 66.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 66.10 66.10 66.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 66.10 66.10 66.10 =============== 612-00031 Delin (Ty I) (Extra Ht) Each =================================================== NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 116.00 45.00 43.89 47.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 116.00 45.00 43.89 47.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 116.00 45.00 43.89 47.00 =============== 612-00032 Delin (Ty II) (Extra Ht) Each =================================================== C0703-440 AVALANCHE CONTROL SYSTEM: EJM 02/01/18 1.00 300.00 70.51 52.00 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 4.00 48.00 48.67 48.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 98.40 53.04 48.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 98.40 53.04 48.80 =============== 612-00033 Delin (Ty III) (Extra Ht) Each =================================================== NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 22.00 51.00 53.95 51.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 22.00 51.00 53.95 51.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 22.00 51.00 53.95 51.00 =============== 612-00036 Delin (Flex) (Sq Base) Each =================================================== SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 30.00 25.00 58.67 60.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 398 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00036 Delin (Flex) (Sq Base) Each =================================================== ITSSW01-833 ABOUT 1.5 MILES NORTH OF THE 01/18/18 14.00 200.00 153.25 117.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 44.00 80.68 94.95 78.14 STA052A-040 SH 52: Antelope Creek 08/23/18 2.00 90.00 162.50 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 90.00 162.50 100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 46.00 81.09 100.08 79.09 =============== 612-00037 Delin (Flex) (Flat Mount) Each =================================================== STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 427.00 70.00 56.89 62.00 STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 10.00 75.00 54.18 50.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 12.00 75.00 49.25 47.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 449.00 70.24 56.65 61.33 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 6.00 50.00 84.04 100.30 ER052A-039 SH 170 11/15/18 4.00 60.00 69.65 40.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 44.00 80.00 60.74 67.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 54.00 75.19 64.65 68.70 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 503.00 70.78 57.91 62.12 =============== 612-00038 Delin (Flex) (Clmp Mount) Each =================================================== NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 4.00 25.00 58.32 57.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 25.00 58.32 57.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 25.00 58.32 57.75 =============== 612-00039 Delin (Flex) (Surf Mount) Each =================================================== SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 13.00 35.00 50.00 50.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 399 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00039 Delin (Flex) (Surf Mount) Each =================================================== STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 20.00 95.00 75.25 83.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 21.00 101.00 97.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 54.00 82.89 74.81 81.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 54.00 82.89 74.81 81.67 =============== 612-00040 Delin (Flex) (Extra Ht) Each =================================================== STA086A-051 SH 86; WEST OF I-70 11/29/18 71.00 100.00 93.02 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 71.00 100.00 93.02 100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 71.00 100.00 93.02 100.00 =============== 612-00041 Delin (Flex) (Ty I) Each =================================================== NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 4.00 200.00 80.00 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 200.00 80.00 80.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 19.00 27.00 67.24 60.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 273.00 90.00 60.84 60.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 7.00 90.00 61.81 65.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 74.00 30.00 61.29 59.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 373.00 74.89 61.60 59.90 BR1131-006 SH 113 AT MP 11.5 10/11/18 13.00 100.00 81.97 70.93 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 30.00 59.70 119.07 119.07 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 43.00 71.88 88.92 104.52 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 420.00 75.77 63.52 64.66 =============== 612-00042 Delin (Flex) (Ty II) Each =================================================== STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 23.00 100.00 92.36 96.43 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 23.00 100.00 92.36 96.43 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 400 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00042 Delin (Flex) (Ty II) Each =================================================== BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 7.00 50.00 70.93 65.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 5.00 115.00 62.59 65.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 1.00 100.00 95.50 48.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 13.00 78.85 70.20 63.69 BR1131-006 SH 113 AT MP 11.5 10/11/18 6.00 110.00 91.16 71.29 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 10.00 61.83 120.15 120.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 16.00 79.89 95.30 101.83 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 52.00 88.53 85.03 89.91 =============== 612-00043 Delin (Flex) (Ty III) Each =================================================== C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 9.00 50.00 133.00 125.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 5.00 40.00 72.79 65.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 20.00 85.00 64.09 70.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 37.00 90.00 69.53 70.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 12.00 40.00 66.73 61.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 1.00 100.00 97.75 49.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 84.00 74.52 72.66 74.06 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 10.00 63.96 121.23 121.23 C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 8.00 125.00 96.40 113.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 18.00 91.09 101.37 117.57 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 102.00 77.45 75.01 81.74 =============== 612-00052 Reflector Each =================================================== NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 3.00 100.00 63.50 64.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 401 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00052 Reflector Each =================================================== NHPP0702-366 I-70 Avon to Vail 11/08/18 1,240.00 2.50 19.42 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,243.00 2.74 19.47 22.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,243.00 2.74 19.47 22.10 =============== 612-00060 Reflector (Median Barrier) Each =================================================== NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 4.00 25.00 104.00 106.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 25.00 104.00 106.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 25.00 104.00 106.00 =============== 612-00070 Reflector Strip (4 In) Each =================================================== NHPP0702-366 I-70 Avon to Vail 11/08/18 2,850.00 20.00 38.78 27.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,850.00 20.00 38.78 27.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,850.00 20.00 38.78 27.00 =============== 612-00075 Reflector Strip (6 In) Each =================================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 3,550.00 29.85 29.85 29.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,550.00 29.85 29.85 29.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,550.00 29.85 29.85 29.85 =============== 612-00081 Delin (PM) (Ty I) Each =================================================== STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 175.00 60.00 58.50 48.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 175.00 60.00 58.50 48.50 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 23.00 60.00 51.50 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 23.00 60.00 51.50 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 198.00 60.00 58.07 48.67 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 402 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00101 Delin (Drv Conc Inst) (Ty I) Each =================================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 19.00 100.00 25.48 25.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 45.00 110.00 141.00 105.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 175.00 125.00 98.00 101.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 1,000.00 105.00 92.24 97.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 129.00 125.00 112.90 91.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,368.00 109.54 95.62 96.21 FBR060A-022 SH 60 over the South Platte 07/12/18 21.00 22.00 126.32 82.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 10.00 120.00 129.92 47.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 31.00 53.61 127.01 70.71 BR1131-006 SH 113 AT MP 11.5 10/11/18 4.00 150.00 105.91 63.53 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 8.00 110.00 138.43 130.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 703.00 105.00 106.33 105.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 243.00 105.00 113.20 125.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 6.00 100.00 113.62 113.21 STA052A-045 SH 52B NEW RAYMER SOUTH 12/13/18 324.00 105.00 125.67 127.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,288.00 105.15 112.93 114.37 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,687.00 106.79 101.67 104.62 =============== 612-00102 Delin (Drv Conc Inst) (Ty II) Each =================================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 26.00 100.00 26.63 26.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 4.00 115.00 145.43 105.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 250.00 120.00 99.75 102.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 2.00 110.00 97.56 100.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 282.00 118.01 97.06 95.02 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 28.00 120.00 135.00 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 28.00 120.00 135.00 50.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 403 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00102 Delin (Drv Conc Inst) (Ty II) Each =================================================== NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 103.00 110.00 107.73 107.10 STA086A-051 SH 86; WEST OF I-70 11/29/18 6.00 110.00 116.74 128.00 STA052A-045 SH 52B NEW RAYMER SOUTH 12/13/18 12.00 110.00 130.67 132.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 121.00 110.00 110.75 110.61 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 431.00 115.89 104.14 96.47 =============== 612-00103 Delin (Drv Conc Inst) (Ty III) Each =================================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 11.00 100.00 28.25 28.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 2.00 120.00 152.16 105.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 20.00 130.00 102.00 103.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 299.00 114.00 99.07 102.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 18.00 150.00 132.85 109.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 350.00 116.36 100.61 100.11 FBR060A-022 SH 60 over the South Platte 07/12/18 2.00 25.00 171.72 84.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 25.00 171.72 84.00 BR1131-006 SH 113 AT MP 11.5 10/11/18 2.00 160.00 132.48 64.17 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 3.00 110.00 155.14 150.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 257.00 110.00 109.82 110.25 STA086A-051 SH 86; WEST OF I-70 11/29/18 96.00 110.00 120.29 132.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 26.00 100.00 117.50 124.53 STA052A-045 SH 52B NEW RAYMER SOUTH 12/13/18 46.00 115.00 135.67 137.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 430.00 110.16 117.06 118.89 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 782.00 112.72 107.24 110.40 =============== 612-00111 Delin (Drv)(Ty I) Each =================================================== STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 20.00 50.00 88.75 101.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 50.00 88.75 101.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 404 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00111 Delin (Drv)(Ty I) Each =================================================== FSA0711-020 SH 71 & SH 94: PUNKIN CENTER 05/03/18 30.00 100.00 65.00 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 30.00 100.00 65.00 80.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 18.00 100.00 113.75 88.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 18.00 100.00 113.75 88.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 68.00 85.29 93.41 88.43 =============== 612-00112 Delin (Drv)(Ty II) Each =================================================== STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 28.00 50.00 73.00 77.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 28.00 50.00 73.00 77.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 10.00 100.00 117.11 94.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 100.00 117.11 94.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 38.00 63.16 91.38 81.58 =============== 612-00113 Delin (Drv)(Ty III) Each =================================================== STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 2.00 75.00 75.13 78.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 75.00 75.13 78.00 FSA0711-020 SH 71 & SH 94: PUNKIN CENTER 05/03/18 4.00 100.00 73.33 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 100.00 73.33 90.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 91.67 74.05 86.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 405 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00260 Loc Mark (Fib Opt)(Dome) Each =================================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 2.00 100.00 132.50 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 100.00 132.50 100.00 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 35.00 120.00 186.67 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 35.00 120.00 186.67 350.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 56.00 171.82 171.82 171.82 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 56.00 171.82 171.82 171.82 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 67.00 250.00 127.33 121.00 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 94.00 95.00 98.05 100.00 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 47.00 75.00 95.00 75.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 18.00 170.10 170.10 170.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 226.00 142.77 107.23 106.61 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 319.00 145.11 120.61 144.72 =============== 612-00270 Loc Mark (Util)(Flat Slat) Each =================================================== ITSSW01-833 ABOUT 1.5 MILES NORTH OF THE 01/18/18 5.00 150.00 134.00 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 150.00 134.00 90.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 7.00 76.37 76.37 76.37 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7.00 76.37 76.37 76.37 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 82.00 100.00 105.00 75.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 406 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00270 Loc Mark (Util)(Flat Slat) Each =================================================== SHER100-302 RAMP METERING - DENVER METRO 12/13/18 95.00 70.00 85.33 66.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 18.00 75.60 75.60 75.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 195.00 83.13 93.83 70.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 207.00 84.52 95.01 71.33 =============== 613-00050 1/2 In Elec Cond Lin Foot =============================================== NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 150.00 30.00 16.83 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 150.00 30.00 16.83 18.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 35.00 13.00 42.93 41.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 35.00 13.00 42.93 41.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 185.00 26.78 23.03 22.35 =============== 613-00075 3/4 In Elec Cond Lin Foot =============================================== NHPP5502-088 US 550 RIVERSIDE SNOW SHED LI 01/25/18 140.00 5.00 29.52 19.56 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 140.00 5.00 29.52 19.56 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 140.00 5.00 29.52 19.56 =============== 613-00100 1 In Elec Cond Lin Foot =============================================== NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 294.00 40.00 25.00 25.00 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 20.00 50.00 57.33 29.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 314.00 40.64 30.48 25.25 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 30.00 30.00 42.50 30.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 100.00 39.15 38.85 38.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 130.00 37.04 40.22 36.81 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 444.00 39.58 33.51 28.64 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 407 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-00125 1-1/4 In Elec Cond Lin Foot =============================================== NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 150.00 30.00 33.00 50.00 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 290.00 24.00 19.00 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 440.00 26.05 23.77 26.93 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 440.00 26.05 23.77 26.93 =============== 613-00200 2 In Elec Cond Lin Foot =============================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 100.00 30.00 118.41 56.82 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 100.00 12.00 17.73 12.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 706.00 9.11 15.00 15.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 948.00 27.00 11.11 11.59 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 1,600.00 20.00 8.70 6.54 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 112.00 20.00 17.77 40.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 10.00 12.00 72.40 124.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,576.00 19.74 11.50 12.49 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 610.00 12.00 8.82 6.60 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 45.00 12.00 22.33 20.00 FBR0705-087 I-70: EMERGENCY BRIDGE G-25-K 05/16/18 1,238.00 20.00 20.00 20.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 929.00 25.00 19.00 19.00 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 150.00 50.00 55.00 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,972.00 21.31 14.01 18.20 FBR060A-022 SH 60 over the South Platte 07/12/18 1,740.00 12.00 7.17 6.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 230.00 20.00 13.85 13.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 163.00 15.00 11.75 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,133.00 13.09 7.70 7.44 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 65.00 15.00 49.96 48.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 408 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-00200 2 In Elec Cond Lin Foot =============================================== FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 235.00 13.00 15.45 17.28 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 2,138.00 12.55 12.55 12.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,438.00 12.66 16.28 13.95 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,119.00 17.33 10.61 13.37 =============== 613-00206 2 In Elec Cond (Bored) Lin Foot =============================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 95.00 20.00 54.50 48.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 840.00 20.00 22.25 35.00 ITSSW01-833 ABOUT 1.5 MILES NORTH OF THE 01/18/18 320.00 35.00 28.25 19.00 STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 2,922.00 15.00 12.00 10.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 1,500.00 10.00 12.38 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,677.00 15.63 15.88 15.64 NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPL 04/05/18 450.00 25.00 21.50 23.00 STAR400-347 Various intersections across 04/12/18 325.00 25.00 41.50 62.50 STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 1,750.00 25.00 15.45 21.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 440.00 17.00 22.87 24.00 FSA0711-020 SH 71 & SH 94: PUNKIN CENTER 05/03/18 280.00 30.00 21.33 38.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 5,000.00 15.00 12.26 12.05 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 229.00 45.00 37.00 37.00 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 240.00 70.00 94.00 92.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8,714.00 20.78 17.10 20.59 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 250.00 90.00 62.52 54.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 720.00 23.00 16.53 16.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 3,730.00 14.01 14.01 14.01 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 2,480.00 20.00 18.05 18.00 C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 146.00 23.00 67.50 51.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 1,062.00 18.50 15.13 12.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8,388.00 19.54 21.23 17.01 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 330.00 18.00 25.50 37.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 409 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-00206 2 In Elec Cond (Bored) Lin Foot =============================================== FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 420.00 20.00 18.88 17.75 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 270.00 40.00 63.00 50.00 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 16,945.00 25.00 15.57 15.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 320.00 63.48 63.00 63.00 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 190.00 15.00 32.40 35.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 2,005.00 16.00 25.04 23.25 C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 119.00 55.00 92.60 82.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 1,560.00 13.00 15.29 16.04 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 54,350.00 14.00 13.35 9.80 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 5,190.00 13.87 13.87 13.87 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 81,699.00 16.69 14.84 12.24 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 104,478.00 17.20 15.55 13.51 =============== 613-00207 2 In Elec Cond (Bridge) (Spec) Lin Foot =============================================== NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 5,040.00 55.00 57.00 71.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,040.00 55.00 57.00 71.00 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 2,630.00 25.00 78.73 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,630.00 25.00 78.73 80.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,670.00 44.71 65.91 74.09 =============== 613-00250 2-1/2 In Elec Cond Lin Foot =============================================== NHPP5502-088 US 550 RIVERSIDE SNOW SHED LI 01/25/18 590.00 35.00 55.41 34.36 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 590.00 35.00 55.41 34.36 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 30.00 25.00 14.84 13.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 30.00 25.00 14.84 13.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 620.00 34.52 53.08 33.34 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 410 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-00300 3 In Elec Cond Lin Foot =============================================== STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 10.00 35.00 30.00 36.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 35.00 30.00 36.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 890.00 50.00 35.00 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 890.00 50.00 35.00 35.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 180.00 25.00 17.72 16.50 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 256.00 17.00 15.50 17.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 436.00 20.30 16.64 16.79 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 164.00 25.00 77.69 75.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 560.00 14.00 13.57 13.58 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 724.00 16.49 28.09 27.49 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,060.00 31.87 25.08 28.51 =============== 613-00306 3 In Elec Cond (Bored) Lin Foot =============================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 380.00 50.00 67.13 50.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 840.00 20.00 24.75 40.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 220.00 25.70 31.12 32.45 STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 2,178.00 17.00 17.33 12.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 203.00 25.00 101.25 100.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 2,000.00 20.00 13.50 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,821.00 21.23 28.83 23.05 NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPL 04/05/18 850.00 30.00 24.83 25.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 411 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-00306 3 In Elec Cond (Bored) Lin Foot =============================================== STAR400-347 Various intersections across 04/12/18 205.00 27.00 51.50 98.50 STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 250.00 27.00 18.69 20.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 845.00 24.85 30.35 33.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 2,300.00 20.00 14.56 14.25 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 458.00 50.00 38.00 38.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4,908.00 26.02 22.17 25.37 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 610.00 28.00 16.23 15.25 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 750.00 22.55 22.55 22.55 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 4,690.00 25.00 20.18 20.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 1,388.00 23.00 17.75 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7,438.00 24.63 18.82 18.93 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 1,030.00 25.00 20.05 18.85 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 377.00 25.00 50.17 48.30 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 600.00 69.83 69.30 69.30 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 1,730.00 31.00 32.45 32.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 3,120.00 18.00 18.05 18.51 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 8,510.00 14.00 17.33 14.50 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 4,000.00 22.33 22.33 22.33 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 19,367.00 20.41 21.20 20.91 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 37,534.00 22.11 22.17 21.44 =============== 613-00400 4 In Elec Cond Lin Foot =============================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 310.00 84.63 84.00 84.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 310.00 84.63 84.00 84.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 310.00 84.63 84.00 84.00 =============== 613-00407 4 In Elec Cond (Brdg)(Spec) Lin Foot =============================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 20.00 43.38 43.05 43.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 20.00 43.38 43.05 43.05 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 43.38 43.05 43.05 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 412 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-00607 6 In Elec Cond (Brdg)(Spec) Lin Foot =============================================== NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 5,900.00 65.00 86.50 93.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,900.00 65.00 86.50 93.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,900.00 65.00 86.50 93.50 =============== 613-01100 1 In Elec Cond (P) Lin Foot =============================================== C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 430.00 20.39 20.39 20.39 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 60.00 14.00 19.58 16.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 490.00 19.61 20.21 19.91 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 110.00 10.00 7.58 6.15 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 30.00 20.00 45.97 44.10 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 4,800.00 12.17 12.08 12.08 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 880.00 8.00 13.37 13.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 470.00 20.19 20.19 20.19 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6,290.00 12.19 13.03 12.86 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,780.00 12.72 13.42 13.37 =============== 613-01200 2 In Elec Cond (P) Lin Foot =============================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 40.00 16.00 25.25 33.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 955.00 11.00 11.00 11.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 810.00 15.00 20.00 15.50 ITSSW01-833 ABOUT 1.5 MILES NORTH OF THE 01/18/18 285.00 30.00 15.81 15.00 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 1,336.00 22.00 7.02 5.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 2,910.00 22.00 11.26 11.59 STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 420.00 19.00 11.17 9.50 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 1,200.00 17.00 8.85 11.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 360.00 5.00 8.88 9.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8,316.00 18.69 11.07 10.77 STAR400-347 Various intersections across 04/12/18 712.00 18.00 23.67 30.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 413 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-01200 2 In Elec Cond (P) Lin Foot =============================================== STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 50.00 15.00 16.94 12.50 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 770.00 6.00 12.26 12.05 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 15.00 6.00 67.41 45.00 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 4,905.00 45.00 55.33 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6,452.00 37.04 45.05 35.36 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 5,500.00 20.00 20.26 19.16 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 4,845.00 12.67 12.67 12.67 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 355.00 16.00 19.85 21.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10,700.00 16.55 19.30 16.30 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 640.00 20.00 18.00 23.00 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 425.00 13.00 12.67 12.25 NHPP0702-366 I-70 Avon to Vail 11/08/18 1,114.00 20.00 30.71 14.60 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 7,120.00 20.00 14.83 18.00 ER052A-039 SH 170 11/15/18 116.00 20.00 21.09 20.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 3,720.00 13.22 13.13 13.13 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 30.00 12.00 24.40 25.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 23,200.00 12.00 11.20 10.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 5,985.00 8.00 10.93 10.68 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 2,120.00 5.00 14.42 10.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 35,025.00 12.55 12.55 12.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 79,495.00 12.72 12.55 12.24 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 104,963.00 15.08 15.47 13.96 =============== 613-01201 2 In Elec Cond (P) (Spec) Lin Foot =============================================== NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 650.00 55.00 108.33 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 650.00 55.00 108.33 45.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 650.00 55.00 108.33 45.00 =============== 613-01300 3 In Elec Cond (P) Lin Foot =============================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 80.00 26.00 27.23 35.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 414 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-01300 3 In Elec Cond (P) Lin Foot =============================================== STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 885.00 24.00 13.17 11.50 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 360.00 12.00 10.50 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,325.00 20.86 13.26 12.78 STAR400-347 Various intersections across 04/12/18 1,115.00 20.00 21.67 20.00 STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 50.00 18.00 18.29 13.50 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 400.00 20.00 14.82 14.79 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,565.00 19.94 19.41 18.46 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 1,920.00 19.26 19.26 19.26 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 480.00 18.00 21.28 22.20 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 2,608.00 15.00 9.15 14.75 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 383.00 23.00 22.89 18.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 1,443.00 15.00 8.07 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6,834.00 16.86 10.22 14.45 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 180.00 15.00 17.69 17.80 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 600.00 15.35 15.23 15.23 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 60.00 13.00 26.44 27.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 2,140.00 16.00 14.39 13.75 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 610.00 10.00 17.75 13.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1,760.00 19.07 19.07 19.07 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5,350.00 16.19 15.93 15.87 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15,074.00 17.29 12.18 15.22 =============== 613-01402 Inst 4 In Elec Cond (P) Lin Foot =============================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 2,310.00 12.70 12.60 12.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,310.00 12.70 12.60 12.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,310.00 12.70 12.60 12.60 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 415 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-01602 Inst 6 In Elec Cond (P) Lin Foot =============================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 160.00 14.28 14.18 14.18 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 160.00 14.28 14.18 14.18 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 160.00 14.28 14.18 14.18 =============== 613-03491 Elec Cond (P) (Mult) Lin Foot =============================================== NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 3,670.00 26.00 94.67 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,670.00 26.00 94.67 40.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 42,210.00 22.77 22.77 22.77 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 42,210.00 22.77 22.77 22.77 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 41,735.00 20.00 10.66 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 41,735.00 20.00 10.66 8.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 87,615.00 21.59 17.18 16.46 =============== 613-03492 Elec Cond (P)(Mult)(Bored) Lin Foot =============================================== NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 960.00 70.00 138.33 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 960.00 70.00 138.33 140.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 9,810.00 32.34 32.34 32.34 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9,810.00 32.34 32.34 32.34 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 51,640.00 32.00 20.50 18.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 416 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-03492 Elec Cond (P)(Mult)(Bored) Lin Foot =============================================== ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 10,995.00 25.00 34.38 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 62,635.00 30.77 23.57 20.11 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 73,405.00 31.49 25.54 23.31 =============== 613-03500 Elec Cond (P) (Mult) (Spec) Lin Foot =============================================== NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 750.00 70.00 114.00 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 750.00 70.00 114.00 55.00 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 30,800.00 15.82 28.07 20.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 30,800.00 15.82 28.07 20.90 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 31,550.00 17.11 29.61 21.71 =============== 613-04020 Hanger System LUMP SUM =============================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 116289.47 159428.98 159428.98 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 116289.47 159428.98 159428.98 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 116289.47 159428.98 159428.98 =============== 613-04100 Elect System Mods LUMP SUM =============================================== NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 1.00 9000.00 107366.67 11300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 9000.00 107366.67 11300.00 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 1.00 7000.00 1809.82 1325.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 7000.00 1809.82 1325.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 8000.00 41393.64 6312.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 417 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-04125 1-1/4 In Elec Cond (Liquidtight Flx Met) Lin Foot =============================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 20.00 75.92 42.21 42.21 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 20.00 75.92 42.21 42.21 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 75.92 42.21 42.21 =============== 613-04130 1-1/2 In Elec Cond (Liquidtight Flx Met) Lin Foot =============================================== NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 50.00 25.00 45.88 31.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 50.00 25.00 45.88 31.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 25.00 45.88 31.00 =============== 613-04200 2 In Elec Cond (Liquidtight Flx Met) Lin Foot =============================================== ITSSW01-833 ABOUT 1.5 MILES NORTH OF THE 01/18/18 180.00 20.00 27.06 34.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 180.00 20.00 27.06 34.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 410.00 39.38 39.38 39.38 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 410.00 39.38 39.38 39.38 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 590.00 33.47 31.53 37.74 =============== 613-07000 Pull Box (Spec) Each =================================================== NHPP5502-088 US 550 RIVERSIDE SNOW SHED LI 01/25/18 74.00 345.14 407.89 571.54 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 8.00 850.00 559.94 579.52 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 2.00 650.00 350.00 365.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 84.00 400.48 427.15 567.38 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 34.00 900.00 402.37 394.49 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 34.00 900.00 402.37 394.49 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 418 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-07000 Pull Box (Spec) Each =================================================== STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 17.00 600.00 775.50 1042.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 17.00 600.00 775.50 1042.00 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 1.00 7000.00 2310.00 1650.00 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 6.00 600.00 291.69 307.74 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 28.00 600.00 460.00 160.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 5.00 640.50 640.50 640.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 40.00 765.06 480.80 279.47 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 175.00 600.24 447.68 514.09 =============== 613-07001 Type One Pull Box Each =================================================== ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 1.00 700.00 1040.80 605.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 2.00 800.00 1073.91 1025.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 766.67 1066.02 885.00 STAR400-347 Various intersections across 04/12/18 4.00 775.00 998.00 1000.00 STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 7.00 775.00 782.50 855.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 11.00 775.00 847.15 907.73 NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 2.00 750.00 1000.00 1000.00 C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 1.00 750.00 1290.75 940.00 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 12.00 900.00 835.75 671.00 NHPP070A-032 I-70B & Z GRAND JCT PHASE 1 A 09/20/18 15.00 750.00 882.50 700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 30.00 810.00 878.02 716.40 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 419 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-07001 Type One Pull Box Each =================================================== FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 2.00 800.00 682.47 505.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 8.00 1057.94 1050.00 1050.00 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 6.00 1000.00 796.86 700.00 C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 1.00 950.00 713.20 759.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 17.00 1000.80 805.59 845.24 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 61.00 854.73 872.34 795.10 =============== 613-07002 Type Two Pull Box Each =================================================== BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 3.00 560.00 560.08 579.52 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 560.00 560.08 579.52 STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 3.00 1000.00 1127.50 1225.00 FSA0711-020 SH 71 & SH 94: PUNKIN CENTER 05/03/18 3.00 1100.00 1033.33 1400.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 11.00 850.00 811.23 799.93 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 17.00 920.59 900.37 980.84 C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 1.00 800.00 1535.50 1180.00 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 8.00 650.00 1052.75 957.00 STM0252-469 R2 ADA RAMPS I-25 INT S NEV- 09/06/18 5.00 900.00 1458.50 1500.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 7.00 750.00 730.50 790.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 21.00 750.00 1011.74 1041.24 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 4.00 1000.00 1043.58 865.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 4.00 1500.00 1368.17 1312.50 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 42.00 1206.05 1197.00 1197.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 116.00 800.00 1042.97 1000.00 C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 1.00 1250.00 998.00 1009.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 167.00 926.37 1061.68 1053.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 208.00 902.81 1026.52 1039.77 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 420 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-07003 Type Three Pull Box Each =================================================== STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 16.00 1100.00 825.67 525.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16.00 1100.00 825.67 525.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 15.00 950.00 1075.37 1046.49 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 15.00 950.00 1075.37 1046.49 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 16.00 1200.00 1468.50 1580.00 C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 1.00 850.00 1793.00 1450.00 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 3.00 1000.00 1420.75 1276.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20.00 1152.50 1483.60 1527.90 C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 1.00 1300.00 1302.80 1279.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1300.00 1302.80 1279.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 52.00 1080.77 1129.70 1075.66 =============== 613-07004 Type Four Pull Box Each =================================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 1.00 1200.00 2175.00 1700.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 10.00 1300.00 1122.50 1170.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11.00 1290.91 1218.18 1218.18 NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPL 04/05/18 3.00 1200.00 989.33 993.00 STAR400-347 Various intersections across 04/12/18 12.00 1350.00 1842.33 1500.00 STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 1.00 1500.00 1658.75 1885.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 24.00 1700.00 1320.88 1298.52 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 40.00 1552.50 1439.09 1350.71 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 421 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-07004 Type Four Pull Box Each =================================================== STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 6.00 1600.00 2040.50 2046.00 C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 1.00 1000.00 1924.25 1475.00 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 1.00 1200.00 1810.50 1455.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 1475.00 1971.25 1900.75 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 4.00 1500.00 1660.53 1510.00 C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 1.00 1500.00 1333.00 1300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 1500.00 1595.02 1468.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 64.00 1493.75 1484.75 1405.85 =============== 613-07005 Type Five Pull Box Each =================================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 1.00 2000.00 3085.00 3000.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 3.00 1800.00 1430.00 1490.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 1850.00 1843.75 1867.50 NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPL 04/05/18 1.00 1500.00 1303.00 1254.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 1.00 1250.00 1215.00 1100.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 3.00 1650.00 1890.71 1862.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 1540.00 1613.69 1588.51 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 5.00 1300.00 2291.17 2160.00 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 3.00 2000.00 2344.50 2314.00 C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 1.00 1500.00 2275.75 1788.00 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 2.00 1650.00 2143.88 1853.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 11.00 1572.73 2272.00 2112.45 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 1.00 1750.00 1970.28 1750.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 422 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-07005 Type Five Pull Box Each =================================================== C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 1.00 1800.00 1717.20 1626.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 1775.00 1843.74 1688.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 22.00 1634.09 2024.49 1910.25 =============== 613-07010 Pull Box (Surf Mtd) Each =================================================== NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 21.00 1000.00 3139.67 4700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 21.00 1000.00 3139.67 4700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21.00 1000.00 3139.67 4700.00 =============== 613-07011 Pull Box (11"x18"x12") Each =================================================== STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 1.00 800.00 1437.50 1600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 800.00 1437.50 1600.00 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 56.00 700.00 1916.67 1080.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 56.00 700.00 1916.67 1080.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 7.00 1235.61 1235.61 1235.61 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7.00 1235.61 1235.61 1235.61 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 113.00 950.00 1088.33 890.00 ER052A-039 SH 170 11/15/18 3.00 700.00 942.81 1170.00 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 95.00 600.00 853.33 600.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 138.00 1223.25 1223.25 1223.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 349.00 960.63 1023.29 945.24 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 413.00 929.56 1183.57 970.02 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 423 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-07016 Pull Box (16"x16"x6") Each =================================================== FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 39.00 850.00 1145.52 1283.57 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 39.00 850.00 1145.52 1283.57 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 39.00 850.00 1145.52 1283.57 =============== 613-07023 Pull Box (24"x36"x24") Each =================================================== STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 13.00 1500.00 2062.50 2500.00 ITSSW01-833 ABOUT 1.5 MILES NORTH OF THE 01/18/18 5.00 1800.00 1517.25 1254.00 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 2.00 1250.00 1905.78 1750.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 4.00 1500.00 1343.07 1960.48 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 24.00 1541.67 1765.99 2088.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 3.00 2500.00 3000.00 3000.00 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 22.00 1600.00 3100.00 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 25.00 1708.00 3095.65 2120.00 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 1.00 2500.00 2665.00 1946.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 9.00 1923.94 1923.94 1923.94 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 8.00 1200.00 1796.88 2150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 18.00 1634.19 1863.75 2025.64 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 16.00 1600.00 1576.25 1470.00 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 32.00 2500.00 1883.33 1500.00 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 60.00 1400.00 1587.03 1350.00 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 32.00 1400.00 1816.67 1550.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 16.00 1904.70 1904.70 1904.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 156.00 1697.92 1694.22 1490.99 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 223.00 1677.09 1847.78 1668.92 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 424 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-07026 Pull Box (16"x24"x12") Each =================================================== NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 1.00 500.00 770.00 1040.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 500.00 770.00 1040.00 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 10.00 900.00 2505.33 1260.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 900.00 2505.33 1260.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 863.64 2396.88 1240.00 =============== 613-07034 Pull Box (24"x36"x18") Each =================================================== FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 25.00 1100.00 1230.94 1308.26 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 25.00 1100.00 1230.94 1308.26 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25.00 1100.00 1230.94 1308.26 =============== 613-07040 Pull Box (30"x48"x24") Each =================================================== STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 1.00 1250.00 2875.50 3125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1250.00 2875.50 3125.00 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 10.00 2200.00 4341.67 2350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 2200.00 4341.67 2350.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 23.00 2667.42 2667.42 2667.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 23.00 2667.42 2667.42 2667.42 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 2.00 2800.00 2061.50 1891.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 425 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-07040 Pull Box (30"x48"x24") Each =================================================== NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 2.00 4000.00 2696.67 2900.00 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 5.00 1500.00 2181.96 1800.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 3.00 1700.00 3487.54 3400.00 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 16.00 1750.00 2321.67 1990.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 4.00 2640.75 2640.75 2640.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 32.00 2023.84 2450.66 2224.53 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 66.00 2263.09 2859.79 2411.53 =============== 613-07060 Pull Box (18"x30"x18") Deep Each =================================================== NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 10.00 1400.00 1005.44 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 1400.00 1005.44 1200.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 13.00 1300.00 1900.00 1900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 13.00 1300.00 1900.00 1900.00 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 42.00 1300.00 1368.08 1740.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 42.00 1300.00 1368.08 1740.00 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 6.00 3000.00 1334.50 869.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 3000.00 1334.50 869.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 71.00 1457.75 1342.87 1619.63 =============== 613-07070 EMS Ball Marker Each =================================================== BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 3.00 1300.00 56.71 57.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 1300.00 56.71 57.95 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 1300.00 56.71 57.95 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 426 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-07195 Proof Conduit Lin Foot =============================================== NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 23,235.00 2.50 3.00 1.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 23,235.00 2.50 3.00 1.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 23,235.00 2.50 3.00 1.00 =============== 613-07199 Inst Pull Box Each =================================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 7.00 1200.76 1191.75 1191.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 7.00 1200.76 1191.75 1191.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 1200.76 1191.75 1191.75 =============== 613-10000 Wiring LUMP SUM =============================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 1.00 15000.00 24950.00 18000.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 1.00 5000.00 12666.67 12000.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 1.00 10000.00 21912.50 30000.00 NHPP5502-088 US 550 RIVERSIDE SNOW SHED LI 01/25/18 1.00 25500.00 61433.13 50667.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 1.00 25000.00 43250.01 41725.75 STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 1.00 42500.00 27108.33 24500.00 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 1.00 30000.00 8274.86 9000.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 1.00 5000.00 33000.00 52000.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 1.00 25000.00 8747.50 9100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9.00 20333.33 30730.79 27443.64 NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPL 04/05/18 1.00 10000.00 6395.67 6122.00 STAR400-347 Various intersections across 04/12/18 1.00 30000.00 151109.00 40000.00 STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 1.00 12500.00 13968.75 9750.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 1.00 55000.00 15922.22 14000.00 FSA0711-020 SH 71 & SH 94: PUNKIN CENTER 05/03/18 1.00 5000.00 4000.00 2500.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 1.00 40000.00 11953.86 11615.45 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 1.00 30000.00 19333.33 19333.33 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 1.00 3000.00 3510.19 2850.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 24550.00 25940.29 14483.75 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 1.00 31000.00 15377.07 18938.40 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 427 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-10000 Wiring LUMP SUM =============================================== NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 1.00 17000.00 11152.00 11300.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 1.00 61940.46 61940.46 61940.46 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 1.00 50000.00 45402.00 43309.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 1.00 12000.00 16486.29 12500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 32882.27 17370.08 24860.16 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 1.00 42500.00 25602.00 31288.00 SHE2254-092 SH225 AND 17TH PLACE IMPROVEM 10/18/18 1.00 29274.72 6833.33 3500.00 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 1.00 15000.00 11543.87 7150.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 1.00 5000.00 6218.18 6660.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 1.00 15000.00 8735.67 8400.00 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 1.00 10000.00 6000.00 3000.00 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 1.00 400000.00 316723.33 350000.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 99974.82 99225.00 99225.00 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 1.00 5000.00 16982.09 16838.34 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 1.00 7500.00 5804.76 4500.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 1.00 27000.00 47296.74 57908.96 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 1.00 50000.00 194000.00 155000.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 313425.00 313425.00 313425.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 13.00 78436.50 58920.62 81299.64 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 35.00 42539.39 33953.65 40791.88 =============== 613-10010 Wiring (Spec) LUMP SUM =============================================== NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 1.00 280000.00 277620.67 247000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 280000.00 277620.67 247000.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 1.00 75000.00 548967.93 470000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 75000.00 548967.93 470000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 177500.00 432676.24 358500.00 =============== 613-10015 Breakaway Wiring System Each =================================================== BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 15.00 220.00 137.68 98.52 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15.00 220.00 137.68 98.52 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 428 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-10015 Breakaway Wiring System Each =================================================== NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 20.00 1200.00 876.67 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20.00 1200.00 876.67 140.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 35.00 780.00 406.40 122.22 =============== 613-13000 Luminaire (LED) Each =================================================== SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 2.00 1200.00 1433.33 1400.00 NHPP5502-088 US 550 RIVERSIDE SNOW SHED LI 01/25/18 194.00 1492.78 2215.68 2035.33 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 196.00 1489.80 2210.87 2028.85 NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPL 04/05/18 2.00 950.00 891.67 670.00 STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 3.00 1350.00 798.75 1075.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 4.00 1485.00 1218.89 1400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 9.00 1321.11 1052.10 1129.44 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 4.00 1250.00 717.08 600.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 8.00 850.00 965.00 960.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.00 983.33 858.75 840.00 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 8.00 1000.00 703.06 650.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 4.00 1000.00 873.60 840.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 10.00 745.85 740.25 740.25 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 38.00 450.00 541.21 617.10 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 1.00 1100.00 785.00 1035.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 61.00 617.35 601.97 663.07 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 278.00 1271.04 1844.09 1648.73 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 429 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-13002 Lumin (Spec)(LED)(24W) Each =================================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 6.00 2946.36 2924.25 2924.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 2946.36 2924.25 2924.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 2946.36 2924.25 2924.25 =============== 613-13006 Lumin (LED) (8500 Lumens) Each =================================================== NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 7.00 700.00 802.50 835.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7.00 700.00 802.50 835.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 12.00 1600.00 1000.00 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12.00 1600.00 1000.00 1000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19.00 1268.42 893.65 939.21 =============== 613-13010 Lumin(LED)(5000 Lumens) Each =================================================== NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 18.00 1150.00 867.74 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 18.00 1150.00 867.74 1000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18.00 1150.00 867.74 1000.00 =============== 613-13012 Lumin (LED)(Wall Type)(10,000 Lumens) Each =================================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 5.00 1380.75 1380.75 1380.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 1380.75 1380.75 1380.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 1380.75 1380.75 1380.75 =============== 613-13040 Lumin (LED)(20400 lumins) Each =================================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 103.00 948.15 948.15 948.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 103.00 948.15 948.15 948.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 103.00 948.15 948.15 948.15 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 430 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-13050 Lumin LED (258W) Each =================================================== IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 108.00 1000.00 939.74 900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 108.00 1000.00 939.74 900.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 108.00 1000.00 939.74 900.00 =============== 613-13065 Lumin (LED) (5400 Lumen) Each =================================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 2.00 4252.50 4252.50 4252.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 4252.50 4252.50 4252.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 4252.50 4252.50 4252.50 =============== 613-16000 Luminaire (Spec) Each =================================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 14.00 1671.54 1659.00 1659.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 14.00 1671.54 1659.00 1659.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 1671.54 1659.00 1659.00 =============== 613-20100 Inst Light Std Each =================================================== NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 24.00 1000.00 1140.67 750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 24.00 1000.00 1140.67 750.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 24.00 1000.00 1140.67 750.00 =============== 613-20200 Inst Lumin Each =================================================== NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 48.00 300.00 267.00 280.00 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 9.00 300.00 219.50 213.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 57.00 300.00 264.21 269.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 57.00 300.00 264.21 269.42 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 431 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-30005 Light Std + Lumin (Pedest) Each =================================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 41.00 4020.16 3990.00 3990.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 41.00 4020.16 3990.00 3990.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 41.00 4020.16 3990.00 3990.00 =============== 613-30302 Light Std Alum (30 Ft) (2) Each =================================================== SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 1.00 3000.00 3800.00 3800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 3000.00 3800.00 3800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 3000.00 3800.00 3800.00 =============== 613-30352 Light Std Alum (35 Ft) (2) Each =================================================== NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 9.00 5000.00 6000.54 7000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9.00 5000.00 6000.54 7000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 5000.00 6000.54 7000.00 =============== 613-32350 Light Std Steel (35 Ft) Each =================================================== NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 19.00 4000.00 3280.00 4800.00 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 17.00 2500.00 1778.33 1850.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 36.00 3291.67 2570.88 3406.94 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 36.00 3291.67 2570.88 3406.94 =============== 613-32400 Light Std Steel (40 Ft) Each =================================================== NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 7.00 5000.00 3675.00 2700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7.00 5000.00 3675.00 2700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 5000.00 3675.00 2700.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 432 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-34200 Light Standard Metal (20 Foot) Each =================================================== NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 6.00 2800.00 2888.33 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 2800.00 2888.33 2000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 2800.00 2888.33 2000.00 =============== 613-34300 Light Std Metal (30 Ft) Each =================================================== FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 4.00 3500.00 2161.45 1950.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 10.00 2909.32 2887.50 2887.50 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 15.00 2500.00 2550.74 2270.94 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 18.00 2856.00 2856.00 2856.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 47.00 2808.54 2560.70 2598.87 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 47.00 2808.54 2560.70 2598.87 =============== 613-34400 Light Std Metal (40 Ft) Each =================================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 80.00 3602.55 3602.55 3602.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 80.00 3602.55 3602.55 3602.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 80.00 3602.55 3602.55 3602.55 =============== 613-34402 Light Std Metal (40 Ft) (2) Each =================================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 4200.00 4200.00 4200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 4200.00 4200.00 4200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 4200.00 4200.00 4200.00 =============== 613-34500 Light Std Metal (50 Ft) Each =================================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 3780.00 3780.00 3780.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 3780.00 3780.00 3780.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 3780.00 3780.00 3780.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 433 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-34700 Light Std Metal (70 Ft) Each =================================================== IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 54.00 4500.00 5237.45 4500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 54.00 4500.00 5237.45 4500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 54.00 4500.00 5237.45 4500.00 =============== 613-40000 Conc Foundation Pad Each =================================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 6.00 3015.12 2992.50 2992.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 3015.12 2992.50 2992.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 3015.12 2992.50 2992.50 =============== 613-40010 Light Std Foundation Each =================================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 2.00 1500.00 2459.11 3718.21 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 4.00 1500.00 1866.67 1800.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 2.00 1490.00 1806.67 1854.48 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 1497.50 1917.66 2293.17 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 13.00 1700.00 4441.67 4500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 13.00 1700.00 4441.67 4500.00 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 6.00 1500.00 1384.00 1255.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 2.00 1500.00 2288.32 2465.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 4.00 1000.00 2736.33 2625.00 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 19.00 1300.00 1670.00 1455.00 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 2.00 2500.00 4500.00 4500.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 51.00 2131.75 2115.75 2115.75 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 40.00 900.00 1248.78 1456.36 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 17.00 1300.00 1738.33 1590.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 100.00 1478.40 1478.40 1478.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 241.00 1495.27 1573.37 1662.38 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 262.00 1505.49 1799.65 1822.44 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 434 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-40012 Light Std Foundation Spec Each =================================================== BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 11.00 450.00 1362.14 1390.86 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 9.00 5000.00 2410.26 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 2497.50 1696.06 2114.97 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 24.00 3400.00 3289.17 2633.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 24.00 3400.00 3289.17 2633.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 1739.85 1739.85 1739.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1739.85 1739.85 1739.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 45.00 2962.00 2585.40 2382.92 =============== 613-40020 Transformer Base Alum Each =================================================== NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 4.00 1500.00 656.03 630.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 1500.00 656.03 630.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 1500.00 656.03 630.00 =============== 613-50100 Lighting Ctrl Center Each =================================================== IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 7.00 10000.00 8514.33 8200.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 11203.50 11203.50 11203.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8.00 10150.44 8607.06 8575.44 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 10150.44 8607.06 8575.44 =============== 613-50102 Inst Lighting Ctrl Center Each =================================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 7.00 2766.75 2766.75 2766.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 7.00 2766.75 2766.75 2766.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 2766.75 2766.75 2766.75 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 435 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-50105 Lighting Ctrl Center (Pedestal Only) Each =================================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 14176.33 14070.00 14070.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 14176.33 14070.00 14070.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 14176.33 14070.00 14070.00 =============== 613-50106 Light Cont Center (Spec) Each =================================================== NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 1.00 7000.00 10063.33 7500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 7000.00 10063.33 7500.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 5.00 8357.69 8295.00 8295.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 8357.69 8295.00 8295.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 8131.41 8958.13 8162.50 =============== 613-50132 2-Plex Recept. (W/Box & Cover) Each =================================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 3.00 2015.37 2000.25 2000.25 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 1.00 500.00 761.67 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 1636.53 1380.96 1535.19 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 1636.53 1380.96 1535.19 =============== 613-50150 Secondary Serv Pedestal Each =================================================== STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 1.00 2750.00 2938.67 2350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 2750.00 2938.67 2350.00 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 4.00 1500.00 6317.67 5873.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 436 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-50150 Secondary Serv Pedestal Each =================================================== STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 3.00 3000.00 4140.00 4322.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7.00 2142.86 5882.13 5208.29 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 2.00 7072.80 7072.80 7072.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 7072.80 7072.80 7072.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 3189.56 5697.87 5295.36 =============== 613-50210 Temporary Lighting LUMP SUM =============================================== NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 1.00 50000.00 316987.67 304290.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 6639.99 3307.50 3307.50 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 160650.00 160650.00 160650.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 72430.00 222984.10 156082.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 72430.00 222984.10 156082.50 =============== 613-50325 Tunnel Lighting Control System LUMP SUM =============================================== NHPP5502-088 US 550 RIVERSIDE SNOW SHED LI 01/25/18 1.00 16600.00 29227.93 16630.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 16600.00 29227.93 16630.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 16600.00 29227.93 16630.00 =============== 613-50355 Power Transformer Each =================================================== NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 5.00 5300.00 5401.67 3600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 5300.00 5401.67 3600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 5300.00 5401.67 3600.00 =============== 613-50375 Solar Collection System Each =================================================== NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 2.00 15000.00 41500.00 52000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 15000.00 41500.00 52000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 15000.00 41500.00 52000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 437 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-80105 Circ Breaker (30A, 2 Pole) Each =================================================== NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 28.00 300.00 1238.33 950.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 28.00 300.00 1238.33 950.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 28.00 300.00 1238.33 950.00 =============== 613-80130 Service Meter Cabinet Each =================================================== ITSSW01-833 ABOUT 1.5 MILES NORTH OF THE 01/18/18 4.00 6000.00 5658.25 4348.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 2.00 5000.00 3842.50 4000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 5666.67 5295.10 4232.00 NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPL 04/05/18 2.00 5000.00 4333.67 2581.00 STAR400-347 Various intersections across 04/12/18 10.00 5500.00 5984.00 6000.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 3.00 5600.00 4339.81 4109.24 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 15.00 5453.33 5366.66 5165.98 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 1.00 4250.00 5337.17 5160.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 3.00 7144.24 7144.24 7144.24 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 6420.68 5939.52 6648.18 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 16.00 6000.00 5122.75 4266.00 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 7.00 9000.00 6576.67 7500.00 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 3.00 6000.00 4802.38 4750.00 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 11.00 5000.00 5923.67 4371.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 7.00 7072.80 7072.80 7072.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 44.00 6397.95 5592.80 5286.29 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 69.00 6130.32 5529.72 5247.41 =============== 613-80274 Struct Mount Disc Switch Each =================================================== SHER100-302 RAMP METERING - DENVER METRO 12/13/18 13.00 2500.00 1066.67 425.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 13.00 2500.00 1066.67 425.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13.00 2500.00 1066.67 425.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 438 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-81500 Panelboard (5KVA Mini Load Center) Each =================================================== NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 12.00 3000.00 6913.33 4550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12.00 3000.00 6913.33 4550.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 3000.00 6913.33 4550.00 =============== 613-81700 Safe Switch NEMA 3R 60A 2 Pole 240V Each =================================================== IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 4.00 500.00 1899.91 1800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 500.00 1899.91 1800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 500.00 1899.91 1800.00 =============== 613-81800 Branch Circuit Panel (Special) Each =================================================== NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 5.00 2500.00 3065.00 4000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 2500.00 3065.00 4000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 2500.00 3065.00 4000.00 =============== 614-00011 Sign Panel (CL I) Sq Foot ================================================ FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 27.75 25.00 28.45 16.90 STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 523.00 20.00 15.70 15.00 STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 6.25 20.00 25.63 24.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 17.00 30.00 16.67 17.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 8.00 25.00 21.25 21.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 102.00 25.00 26.60 28.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 98.00 22.00 13.48 11.65 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 9.00 23.00 53.66 37.44 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 32.25 30.00 17.23 17.00 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 15.00 27.00 30.25 34.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 1,115.00 20.00 21.87 18.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 2.00 25.00 73.48 27.00 NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 200.00 17.00 17.78 18.00 MTCER500-201 R5 FY18 SIGN REPLACEMENT 03/08/18 4,070.67 21.00 17.58 11.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 439 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00011 Sign Panel (CL I) Sq Foot ================================================ NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 153.00 27.00 26.00 27.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6,378.92 20.95 18.65 13.95 NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPL 04/05/18 2.00 20.00 105.00 272.00 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 18.00 24.00 29.10 25.00 STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 4.50 25.00 50.63 64.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 170.00 23.02 21.29 19.00 FSA0711-020 SH 71 & SH 94: PUNKIN CENTER 05/03/18 67.00 23.00 22.67 28.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 373.00 22.00 23.30 25.20 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 18.00 40.00 22.00 22.00 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 221.00 26.00 41.83 23.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 873.50 23.71 26.60 24.35 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 33.00 30.00 37.55 56.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 56.25 30.00 28.48 42.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 32.00 22.00 23.53 24.60 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 105.00 20.00 87.65 147.00 C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 7.00 20.00 54.75 84.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 25.00 32.00 17.50 16.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 537.00 25.00 16.64 18.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 100.00 19.00 19.54 17.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 128.00 25.00 24.43 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,023.25 24.38 23.56 33.92 NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 19.00 22.00 25.00 22.00 SHER200-243 R2 WRONG WAY PREVENTION 10/18/18 3,732.00 12.00 17.00 15.00 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 145.00 20.00 27.84 22.50 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 290.60 25.00 26.47 26.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 82.00 23.00 16.63 3.50 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 792.00 20.00 19.03 18.90 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 558.00 17.00 18.00 18.00 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 267.00 25.00 28.80 19.40 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 13.00 30.00 24.18 25.96 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 135.00 19.19 30.99 30.99 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 28.00 25.00 26.04 22.07 STA086A-051 SH 86; WEST OF I-70 11/29/18 80.00 20.00 20.23 23.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 440 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00011 Sign Panel (CL I) Sq Foot ================================================ STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 711.00 20.00 18.66 16.25 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 295.00 20.00 15.28 15.08 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 33.00 18.00 19.11 20.00 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 294.00 20.00 18.82 20.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 2,224.00 15.00 21.04 22.64 STA052A-045 SH 52B NEW RAYMER SOUTH 12/13/18 172.00 23.00 22.00 22.00 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 312.50 28.00 25.33 25.00 MPR200-252 REGION 2 - PUEBLO COUNTY HIGH 12/20/18 1,948.00 15.00 16.00 14.50 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 138.00 17.05 17.05 17.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 12,269.10 16.20 19.54 17.91 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20,544.77 18.40 19.60 17.75 =============== 614-00012 Sign Panel (CL II) Sq Foot ================================================ FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 237.00 23.00 35.14 20.28 STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 1,149.00 25.00 19.37 20.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 40.00 35.00 20.67 21.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 348.00 27.00 23.75 23.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 36.00 35.00 34.86 29.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 518.00 24.00 16.19 15.25 ITSSW01-833 ABOUT 1.5 MILES NORTH OF THE 01/18/18 32.00 45.00 35.75 29.00 C0703-440 AVALANCHE CONTROL SYSTEM: EJM 02/01/18 84.00 35.00 29.34 26.00 STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 286.00 23.00 27.83 22.50 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 254.00 30.00 21.03 21.00 NHPP5502-096 US550 STRIPING & RUMBLE STRIP 03/01/18 214.00 20.00 23.90 23.00 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 42.00 30.00 35.00 47.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 1,574.00 25.00 26.56 24.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 36.00 35.00 75.15 30.00 NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 362.00 20.00 21.41 22.00 MTCER500-201 R5 FY18 SIGN REPLACEMENT 03/08/18 3,612.23 24.00 20.19 15.50 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 206.00 32.00 26.00 27.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9,030.23 24.80 22.58 19.46 NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPL 04/05/18 36.00 25.00 20.06 1.18 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 179.00 25.99 23.26 22.00 FSA0711-020 SH 71 & SH 94: PUNKIN CENTER 05/03/18 387.00 27.00 26.33 34.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 48.00 27.00 26.12 28.49 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 289.00 50.00 50.00 50.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 441 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00012 Sign Panel (CL II) Sq Foot ================================================ NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 1,053.00 28.00 48.50 28.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,992.00 30.74 38.51 31.35 FBR060A-022 SH 60 over the South Platte 07/12/18 7.00 25.00 34.07 20.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 14.13 30.00 35.33 53.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 113.00 19.72 19.72 19.72 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 14.00 25.00 93.15 158.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 86.25 28.00 20.06 19.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 1,045.00 30.00 19.87 21.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 188.00 30.00 32.68 16.00 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 2,342.00 18.00 22.31 16.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,809.38 22.24 22.27 18.52 SHER200-243 R2 WRONG WAY PREVENTION 10/18/18 16,844.00 15.00 21.63 19.25 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 109.00 20.00 23.25 19.25 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 189.00 25.00 36.20 29.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 69.00 30.00 46.94 57.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 274.00 25.00 27.48 38.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 351.00 23.00 20.98 20.84 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 1,059.00 22.00 21.00 22.00 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 292.00 27.00 38.42 24.25 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 9.00 20.00 36.11 33.04 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 694.00 20.52 13.79 13.79 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 62.00 25.00 32.92 24.39 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 1,088.00 25.00 21.53 19.20 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 356.00 22.00 17.63 18.09 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 371.00 22.00 21.20 22.00 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 248.00 22.00 21.85 21.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 83.00 24.00 28.29 29.44 STA052A-045 SH 52B NEW RAYMER SOUTH 12/13/18 72.00 25.00 25.67 26.00 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 116.50 32.00 34.33 33.00 MPR200-252 REGION 2 - PUEBLO COUNTY HIGH 12/20/18 9,990.00 19.25 20.30 19.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 3,717.00 19.99 19.99 19.99 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 35,993.50 17.96 21.63 19.68 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50,825.11 20.00 22.65 20.01 =============== 614-00013 Sign Panel (CL III) Sq Foot ================================================ NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 72.00 29.00 27.25 16.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 442 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00013 Sign Panel (CL III) Sq Foot ================================================ FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 184.00 35.00 32.25 35.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 810.00 35.00 23.00 24.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,066.00 34.59 26.04 25.36 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 72.00 26.00 39.14 40.54 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 72.00 26.00 39.14 40.54 NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 948.00 30.00 39.00 35.00 SHER200-243 R2 WRONG WAY PREVENTION 10/18/18 2,394.00 18.00 25.25 25.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 1,637.00 28.00 30.88 30.45 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 84.00 31.99 21.65 21.65 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 3,841.00 30.00 25.64 22.00 MPR200-252 REGION 2 - PUEBLO COUNTY HIGH 12/20/18 7,412.00 35.00 25.50 24.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 4,074.00 34.04 34.04 34.04 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 20,390.00 31.06 27.14 26.77 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21,528.00 31.22 27.15 26.74 =============== 614-00014 Lighted Street Name Sign (Inst Only) Each =================================================== NH0242-071 US 24 & 31ST STREET and US24 05/03/18 4.00 2000.00 824.82 950.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 2000.00 824.82 950.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 2000.00 824.82 950.00 =============== 614-00025 Inst Sign Panel (CL I) Sq Foot ================================================ MTCER100-296 MTCE R1 FY18 WEST SIGN REPLAC 01/11/18 3,496.00 9.00 8.50 7.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 60.00 6.00 12.92 11.83 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,556.00 8.95 8.54 7.08 MTCER300-244 MTCE R3 FY 18/19 REGIONWIDE S 05/31/18 10,000.00 8.50 7.83 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10,000.00 8.50 7.83 8.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13,556.00 8.62 8.06 7.76 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 443 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00027 Inst Sign Panel (CL II) Sq Foot ================================================ MTCER100-296 MTCE R1 FY18 WEST SIGN REPLAC 01/11/18 2,284.00 10.00 9.14 8.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 341.00 8.00 24.35 32.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,625.00 9.74 10.20 11.21 MTCER300-244 MTCE R3 FY 18/19 REGIONWIDE S 05/31/18 646.00 11.00 9.67 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 646.00 11.00 9.67 9.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,271.00 9.99 10.11 10.77 =============== 614-00028 Inst Sign Panel (CL III) Sq Foot ================================================ MTCER100-296 MTCE R1 FY18 WEST SIGN REPLAC 01/11/18 39.00 15.00 12.25 10.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 1,350.00 10.00 25.28 30.56 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,389.00 10.14 24.57 29.98 MTCER300-244 MTCE R3 FY 18/19 REGIONWIDE S 05/31/18 198.00 15.00 12.67 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 198.00 15.00 12.67 11.00 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 5,828.00 18.00 14.50 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5,828.00 18.00 14.50 15.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,415.00 16.45 15.53 17.70 =============== 614-00029 Inst Sign Panel (CL II) Each =================================================== STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 8.00 200.00 308.43 549.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 200.00 308.43 549.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 200.00 308.43 549.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 444 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00030 Inst Sign Panel (CL III) Each =================================================== IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 4.00 1000.00 2013.63 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 1000.00 2013.63 2500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 1000.00 2013.63 2500.00 =============== 614-00035 Sign Panel (Spec) Sq Foot ================================================ SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 366.00 30.00 21.78 22.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 366.00 30.00 21.78 22.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 366.00 30.00 21.78 22.35 =============== 614-00037 Sign Panel (Spec) Each =================================================== NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 13.00 50.00 334.11 180.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 13.00 50.00 334.11 180.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13.00 50.00 334.11 180.00 =============== 614-00040 Sign Post (Spec) Lin Foot =============================================== NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 297.00 110.00 225.83 115.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 297.00 110.00 225.83 115.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 43.00 63.96 63.96 63.96 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 43.00 63.96 63.96 63.96 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 340.00 104.18 218.38 108.54 =============== 614-00041 Sign Post (Spec) Each =================================================== C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 14.00 426.39 426.39 426.39 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 14.00 426.39 426.39 426.39 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 445 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00041 Sign Post (Spec) Each =================================================== SHER100-302 RAMP METERING - DENVER METRO 12/13/18 1.00 1000.33 2730.00 3767.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1000.33 2730.00 3767.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15.00 464.65 832.91 649.10 =============== 614-00200 Steel Sign Post (U-2) Lin Foot =============================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 30.00 20.26 17.31 17.31 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 30.00 20.26 17.31 17.31 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 20.26 17.31 17.31 =============== 614-00612 Steel Sign Post (W 6x12) Lin Foot =============================================== NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 348.00 25.00 56.15 52.29 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 348.00 25.00 56.15 52.29 MPR200-252 REGION 2 - PUEBLO COUNTY HIGH 12/20/18 229.00 40.00 53.00 39.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 229.00 40.00 53.00 39.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 577.00 30.95 54.58 47.02 =============== 614-00615 Steel Sign Post (W 6x15) Lin Foot =============================================== ITSSW01-833 ABOUT 1.5 MILES NORTH OF THE 01/18/18 60.00 80.00 90.50 43.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 42.00 25.00 69.43 68.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 102.00 57.35 85.04 53.64 SHER200-243 R2 WRONG WAY PREVENTION 10/18/18 206.00 50.00 50.00 45.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 446 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00615 Steel Sign Post (W 6x15) Lin Foot =============================================== MPR200-252 REGION 2 - PUEBLO COUNTY HIGH 12/20/18 256.00 45.00 61.33 44.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 53.00 52.24 52.24 52.24 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 515.00 47.75 57.16 45.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 617.00 49.33 62.96 46.64 =============== 614-00818 Steel Sign Post (W 8x18) Lin Foot =============================================== MPR200-252 REGION 2 - PUEBLO COUNTY HIGH 12/20/18 313.00 55.00 72.67 53.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 59.00 58.63 58.63 58.63 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 372.00 55.58 71.84 53.89 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 372.00 55.58 71.84 53.89 =============== 614-00821 Steel Sign Post (W 8x21) Lin Foot =============================================== MPR200-252 REGION 2 - PUEBLO COUNTY HIGH 12/20/18 206.00 60.00 85.33 59.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 95.00 69.29 69.29 69.29 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 301.00 62.93 83.20 62.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 301.00 62.93 83.20 62.25 =============== 614-01022 Steel Sign Post (W 10x22) Lin Foot =============================================== NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 32.00 60.00 157.00 117.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 51.00 69.29 80.10 80.10 MPR200-252 REGION 2 - PUEBLO COUNTY HIGH 12/20/18 84.00 70.00 102.00 66.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 269.00 74.62 74.62 74.62 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 436.00 72.03 94.20 76.71 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 436.00 72.03 94.20 76.71 =============== 614-01226 Steel Sign Post (W 12x26) Lin Foot =============================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 41.00 79.95 79.95 79.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 41.00 79.95 79.95 79.95 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 41.00 79.95 79.95 79.95 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 447 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01401 Steel Sign Support Casting Each =================================================== MTCER300-244 MTCE R3 FY 18/19 REGIONWIDE S 05/31/18 450.00 100.00 158.33 175.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 450.00 100.00 158.33 175.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 450.00 100.00 158.33 175.00 =============== 614-01502 Steel Sign Supp (2-In Rd)(Po&Sock) Lin Foot =============================================== BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 63.00 20.50 30.83 26.74 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 63.00 20.50 30.83 26.74 C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 26.00 25.00 38.25 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 26.00 25.00 38.25 40.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 1,940.00 20.00 19.39 24.91 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,940.00 20.00 19.39 24.91 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,029.00 20.08 20.23 25.16 =============== 614-01503 Steel Sign Supp (2-In Rd)(Po&Sock) Each =================================================== STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 45.00 200.00 183.46 200.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 2.00 250.00 145.00 150.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 15.00 210.00 222.60 199.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 1.00 500.00 294.47 225.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 5.00 200.00 239.99 272.29 STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 3.00 200.00 315.00 240.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 1.00 500.00 283.40 368.00 ER144A-002 SH 144 East and West of Goodr 03/08/18 1.00 185.00 325.73 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 73.00 211.44 209.13 205.14 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 14.00 211.93 223.96 220.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 14.00 211.93 223.96 220.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 448 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01503 Steel Sign Supp (2-In Rd)(Po&Sock) Each =================================================== STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 39.00 220.00 191.82 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 39.00 220.00 191.82 200.00 SHER200-243 R2 WRONG WAY PREVENTION 10/18/18 48.00 160.00 167.50 185.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 109.00 200.00 212.67 210.00 MPR200-252 REGION 2 - PUEBLO COUNTY HIGH 12/20/18 29.00 185.00 186.33 149.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 186.00 187.34 199.67 194.04 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 312.00 198.16 203.29 198.55 =============== 614-01512 Steel Sign Supp (2-In Rd)(Post) Lin Foot =============================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 12.00 20.00 20.64 11.27 STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 10.00 20.00 12.50 12.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 280.00 16.00 5.19 3.75 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 12.00 15.00 15.21 16.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 1,736.00 18.00 9.39 9.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 12.00 15.00 14.33 15.00 MTCER500-201 R5 FY18 SIGN REPLACEMENT 03/08/18 525.00 12.00 8.16 6.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,587.00 16.56 8.94 8.01 FSA0711-020 SH 71 & SH 94: PUNKIN CENTER 05/03/18 120.00 17.00 13.17 17.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 120.00 25.00 12.00 12.00 MTCER300-244 MTCE R3 FY 18/19 REGIONWIDE S 05/31/18 1,050.00 6.00 6.00 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,290.00 8.79 6.91 7.58 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 172.00 13.00 9.85 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 172.00 13.00 9.85 9.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 449 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01512 Steel Sign Supp (2-In Rd)(Post) Lin Foot =============================================== FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 64.00 12.00 26.96 21.25 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 135.30 15.00 19.04 16.00 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 535.00 12.00 13.50 15.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 26.00 20.00 14.12 16.52 STA086A-051 SH 86; WEST OF I-70 11/29/18 128.00 15.00 17.41 20.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 78.00 15.00 21.92 19.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 24.00 22.00 10.18 10.05 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 48.00 22.00 13.79 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,038.30 13.88 17.43 16.17 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,087.30 13.92 9.90 9.60 =============== 614-01522 Steel Sign Supp (2-In Rd)(Sock) Each =================================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 1.00 150.00 153.52 107.04 STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 1.00 100.00 500.00 415.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 26.00 135.00 59.06 23.25 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 1.00 120.00 159.22 240.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 158.00 225.00 116.22 97.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 1.00 100.00 101.32 95.00 MTCER500-201 R5 FY18 SIGN REPLACEMENT 03/08/18 45.00 100.00 145.86 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 233.00 188.97 118.78 91.36 FSA0711-020 SH 71 & SH 94: PUNKIN CENTER 05/03/18 10.00 110.00 136.67 40.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 12.00 150.00 76.00 76.00 MTCER300-244 MTCE R3 FY 18/19 REGIONWIDE S 05/31/18 65.00 100.00 101.67 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 87.00 108.05 104.80 89.79 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 16.00 165.00 113.26 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 16.00 165.00 113.26 110.00 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 6.00 120.00 162.28 140.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 450 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01522 Steel Sign Supp (2-In Rd)(Sock) Each =================================================== STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 11.00 150.00 119.80 130.00 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 46.00 120.00 117.50 95.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 2.00 100.00 103.00 177.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 16.00 100.00 131.97 145.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 2.00 100.00 127.29 125.63 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 4.00 100.00 114.13 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 87.00 118.28 125.69 116.84 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 423.00 156.88 117.99 96.99 =============== 614-01572 Steel Sign Supp (2-1/2 Rd NP40)(Po&Silp) Lin Foot =============================================== MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 970.00 50.00 44.13 35.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 970.00 50.00 44.13 35.50 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 381.00 35.00 35.84 43.02 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 381.00 35.00 35.84 43.02 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,351.00 45.77 41.79 37.62 =============== 614-01573 Steel Sign Supp (2-1/2 Rd NP40)(Po&Slip) Each =================================================== STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 94.00 400.00 337.01 350.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 6.00 500.00 346.67 340.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 14.00 400.00 337.80 376.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR ER144A-002 SH 144 East and West of Goodr 03/08/18 3.00 350.00 564.06 540.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 117.00 403.85 351.26 357.47 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 2.00 400.00 399.30 400.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 15.00 414.11 384.45 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 17.00 412.45 385.93 355.88 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 3.00 400.00 506.25 315.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 451 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01573 Steel Sign Supp (2-1/2 Rd NP40)(Po&Slip) Each =================================================== SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 16.00 400.00 466.67 500.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 93.00 400.00 343.08 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 112.00 400.00 363.33 412.01 SHER200-243 R2 WRONG WAY PREVENTION 10/18/18 913.00 280.00 295.00 305.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 90.00 400.00 401.40 399.00 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 16.00 460.00 762.33 582.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 5.00 450.00 417.36 325.00 MPR200-252 REGION 2 - PUEBLO COUNTY HIGH 12/20/18 388.00 400.00 349.00 290.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,412.00 323.26 330.26 310.08 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,658.00 335.05 337.22 320.78 =============== 614-01575 Steel Sign Supp (2-1/2 In Rd NP40)(Po) Lin Foot =============================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 24.00 20.00 29.02 18.03 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 502.00 15.00 9.00 7.50 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 36.00 30.00 15.71 16.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 1,520.00 22.00 17.93 10.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 12.00 25.00 16.25 16.00 MTCER500-201 R5 FY18 SIGN REPLACEMENT 03/08/18 120.00 20.00 13.14 15.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 67.00 25.00 23.60 22.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,281.00 20.56 16.56 10.28 FSA0711-020 SH 71 & SH 94: PUNKIN CENTER 05/03/18 312.00 17.00 25.67 23.00 MTCER300-244 MTCE R3 FY 18/19 REGIONWIDE S 05/31/18 480.00 15.00 20.00 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 792.00 15.79 22.23 24.21 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 110.00 17.00 18.43 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 110.00 17.00 18.43 13.00 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 267.00 18.00 35.26 28.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 452 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01575 Steel Sign Supp (2-1/2 In Rd NP40)(Po) Lin Foot =============================================== STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 256.80 20.00 27.66 21.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 18.00 20.00 40.35 43.00 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 167.00 24.00 15.50 16.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 605.00 28.79 14.60 14.60 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 73.00 25.00 31.85 28.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 24.00 27.00 14.26 14.07 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 48.00 27.00 18.80 24.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,458.80 24.33 27.25 19.66 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,641.80 20.85 19.34 15.67 =============== 614-01578 Steel Sign Supp (2-1/2 In Rd NP40)(Slip) Each =================================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 2.00 250.00 301.76 253.51 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 41.00 260.00 181.25 155.00 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 4.00 250.00 223.35 260.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 138.00 240.00 279.87 239.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 1.00 300.00 238.19 229.00 MTCER500-201 R5 FY18 SIGN REPLACEMENT 03/08/18 10.00 200.00 291.86 235.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 6.00 250.00 352.66 305.31 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 202.00 242.97 268.63 224.23 FSA0711-020 SH 71 & SH 94: PUNKIN CENTER 05/03/18 32.00 260.00 166.67 50.00 MTCER300-244 MTCE R3 FY 18/19 REGIONWIDE S 05/31/18 75.00 225.00 241.67 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 107.00 235.47 219.24 190.19 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 10.00 260.00 219.72 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 260.00 219.72 200.00 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 25.00 250.00 407.94 225.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 23.00 257.00 558.43 790.00 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 14.00 250.00 239.50 229.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 453 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01578 Steel Sign Supp (2-1/2 In Rd NP40)(Slip) Each =================================================== C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 8.00 200.00 452.51 354.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 59.00 106.60 220.26 220.26 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 2.00 500.00 305.50 301.50 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 4.00 500.00 221.24 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 135.00 196.67 426.48 327.64 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 454.00 227.81 291.33 246.42 =============== 614-01582 Steel Sign Supp (2-1/2 In Rd)(Po&Slip) Lin Foot =============================================== C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 40.00 30.38 30.38 30.38 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 40.00 30.38 30.38 30.38 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 56.00 52.00 41.69 32.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 56.00 52.00 41.69 32.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 96.00 42.99 39.98 31.33 =============== 614-01583 Stl Sign Supp (2-1/2 In Rd 80)(Po&Slip) Each =================================================== NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 12.00 600.00 395.00 365.00 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 7.00 350.00 469.00 460.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 25.00 350.00 412.50 430.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 44.00 418.18 418.39 417.05 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 10.00 450.00 350.15 235.60 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 73.00 625.00 1007.50 445.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 83.00 603.92 905.98 419.77 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 12.00 426.39 426.39 426.39 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 454 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01583 Stl Sign Supp (2-1/2 In Rd 80)(Po&Slip) Each =================================================== STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 4.00 420.00 421.39 450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 16.00 424.79 423.53 432.29 SHER200-243 R2 WRONG WAY PREVENTION 10/18/18 277.00 350.00 372.50 395.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 10.00 420.00 357.18 296.54 NHPP0702-366 I-70 Avon to Vail 11/08/18 21.00 500.00 497.60 486.00 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 4.00 500.00 669.00 423.00 MPR200-252 REGION 2 - PUEBLO COUNTY HIGH 12/20/18 23.00 395.00 421.33 349.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 293.00 421.07 421.07 421.07 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 628.00 391.89 402.45 407.13 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 771.00 416.90 493.87 409.58 =============== 614-01585 Steel Sign Supp (2-1/2 In Rd 80) (Post) Lin Foot =============================================== MTCER100-296 MTCE R1 FY18 WEST SIGN REPLAC 01/11/18 2,584.00 23.00 21.19 19.00 C0703-440 AVALANCHE CONTROL SYSTEM: EJM 02/01/18 84.00 30.00 17.80 17.50 NHPP5502-096 US550 STRIPING & RUMBLE STRIP 03/01/18 240.00 21.00 22.43 23.00 MTCER500-201 R5 FY18 SIGN REPLACEMENT 03/08/18 140.00 20.00 19.13 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,048.00 22.90 21.04 19.14 FSA0711-020 SH 71 & SH 94: PUNKIN CENTER 05/03/18 90.00 25.00 33.00 29.00 MTCER300-244 MTCE R3 FY 18/19 REGIONWIDE S 05/31/18 460.00 21.00 24.67 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 550.00 21.65 26.03 25.65 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 24.00 50.00 27.12 24.39 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 264.00 22.00 32.53 34.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 104.00 26.65 26.65 26.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 392.00 24.95 31.63 31.46 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,990.00 22.93 22.42 21.25 =============== 614-01588 Steel Sign Supp (2-1/2 In Rd 80)(Slip) Each =================================================== MTCER100-296 MTCE R1 FY18 WEST SIGN REPLAC 01/11/18 242.00 370.00 304.75 290.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 455 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01588 Steel Sign Supp (2-1/2 In Rd 80)(Slip) Each =================================================== C0703-440 AVALANCHE CONTROL SYSTEM: EJM 02/01/18 6.00 400.00 487.18 410.00 NHPP5502-096 US550 STRIPING & RUMBLE STRIP 03/01/18 20.00 200.00 267.50 240.00 MTCER500-201 R5 FY18 SIGN REPLACEMENT 03/08/18 10.00 200.00 289.71 220.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 278.00 352.30 305.05 286.47 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 9.00 400.00 385.62 435.47 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 28.00 325.00 201.89 135.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 37.00 343.24 246.58 208.09 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 315.00 351.24 298.34 277.27 =============== 614-03001 Conc Footing (Ty 1) Each =================================================== NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 24.00 2000.00 1065.60 1131.19 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 24.00 2000.00 1065.60 1131.19 MPR200-252 REGION 2 - PUEBLO COUNTY HIGH 12/20/18 14.00 1400.00 1085.67 957.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 14.00 1400.00 1085.67 957.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 38.00 1778.95 1074.96 1067.01 =============== 614-03002 Conc Footing (Ty 2) Each =================================================== ITSSW01-833 ABOUT 1.5 MILES NORTH OF THE 01/18/18 4.00 1600.00 1401.00 1144.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 3.00 4000.00 1120.70 1141.39 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7.00 2628.57 1324.55 1142.88 SHER200-243 R2 WRONG WAY PREVENTION 10/18/18 13.00 1200.00 1750.00 1500.00 MPR200-252 REGION 2 - PUEBLO COUNTY HIGH 12/20/18 14.00 1500.00 1280.67 1092.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 4.00 1940.11 1940.11 1940.11 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 31.00 1430.98 1486.78 1372.53 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 38.00 1651.59 1448.82 1330.23 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 456 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-03003 Conc Footing (Ty 3) Each =================================================== NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 10.00 3500.00 5658.33 3500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 3500.00 5658.33 3500.00 MPR200-252 REGION 2 - PUEBLO COUNTY HIGH 12/20/18 16.00 1700.00 1736.67 1260.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 4.00 2025.39 2025.39 2025.39 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 20.00 1765.08 1758.88 1413.08 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 2343.39 3185.51 2108.72 =============== 614-03004 Conc Footing (Ty 4) Each =================================================== MPR200-252 REGION 2 - PUEBLO COUNTY HIGH 12/20/18 10.00 1800.00 1946.67 1490.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 6.00 2131.98 2131.98 2131.98 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 16.00 1924.49 1977.55 1730.74 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 1924.49 1977.55 1730.74 =============== 614-03005 Conc Footing (Ty 5) Each =================================================== NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 2.00 1750.00 2250.00 2500.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 2.00 2505.08 2056.71 2056.71 MPR200-252 REGION 2 - PUEBLO COUNTY HIGH 12/20/18 4.00 2000.00 2713.33 1640.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 16.00 2345.18 2345.18 2345.18 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 24.00 2251.38 2446.95 2216.51 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 24.00 2251.38 2446.95 2216.51 =============== 614-03006 Conc Footing (Ty 6) Each =================================================== NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 1.00 5000.00 6393.33 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 5000.00 6393.33 5000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5000.00 6393.33 5000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 457 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-03007 Conc Footing (Ty 7) Each =================================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 2.00 2718.28 2718.28 2718.28 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 2718.28 2718.28 2718.28 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 2718.28 2718.28 2718.28 =============== 614-07105 Mod Sign Legend Each =================================================== STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 1.00 830.00 968.71 1084.84 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 830.00 968.71 1084.84 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 830.00 968.71 1084.84 =============== 614-10015 Overpass Mtd Sign Bracket Each =================================================== SHER200-243 R2 WRONG WAY PREVENTION 10/18/18 7.00 1000.00 2250.00 1800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 7.00 1000.00 2250.00 1800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 1000.00 2250.00 1800.00 =============== 614-10050 Mod Overhead Sign Str Each =================================================== MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 2.00 5000.00 5845.50 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 5000.00 5845.50 5000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 5000.00 5845.50 5000.00 =============== 614-10110 LED Warning Sign System (_Signs) Each =================================================== ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 2.00 5000.00 7321.60 6972.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 5000.00 7321.60 6972.00 SHE2254-092 SH225 AND 17TH PLACE IMPROVEM 10/18/18 2.00 4972.00 20021.00 17563.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 458 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-10110 LED Warning Sign System (_Signs) Each =================================================== NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 1.00 35000.00 1760.00 520.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 14981.33 15455.75 11882.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 10988.80 10936.78 9918.00 =============== 614-10113 Dyn Mesg Sign (Color LED)(O/H)(Furnish) Each =================================================== C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 2.00 124359.25 124359.25 124359.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 124359.25 124359.25 124359.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 124359.25 124359.25 124359.25 =============== 614-10115 Dyn Mesg Sign (Color LED)(O/H) Each =================================================== IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 1.00 12000.00 145343.40 140000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 12000.00 145343.40 140000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 12000.00 145343.40 140000.00 =============== 614-10120 Var Mesg Sign Each =================================================== IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 4.00 7500.00 50245.56 45000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 7500.00 50245.56 45000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 7500.00 50245.56 45000.00 =============== 614-10123 Inst Var Mesg Sign Each =================================================== NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 1.00 20000.00 16817.17 15000.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 1.00 28763.64 28763.64 28763.64 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 24381.82 18523.81 21881.82 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 1.00 20000.00 14976.68 14500.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 459 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-10123 Inst Var Mesg Sign Each =================================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 28460.25 28460.25 28460.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 24230.13 17673.39 21480.13 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 24305.97 18169.47 21680.97 =============== 614-10124 Furn Var Mesg Sign Each =================================================== C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 3.00 94931.67 94931.67 94931.67 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 94931.67 94931.67 94931.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 94931.67 94931.67 94931.67 =============== 614-10125 Var Mesg Sign (Grnd Mtd) Each =================================================== NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 18.00 38000.00 43083.33 39550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 18.00 38000.00 43083.33 39550.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18.00 38000.00 43083.33 39550.00 =============== 614-10127 Var Speed Limit Sign Each =================================================== NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 6.00 33000.00 33009.00 29000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 33000.00 33009.00 29000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 33000.00 33009.00 29000.00 =============== 614-10134 Var Mesg Sign (LED)(O/H)(Install) Each =================================================== IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 10.00 15000.00 14601.68 13000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 15000.00 14601.68 13000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 15000.00 14601.68 13000.00 =============== 614-10139 Radar Speed Disp Sgn (LED) Each =================================================== NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 2.00 10000.00 17852.00 15704.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 10000.00 17852.00 15704.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 10000.00 17852.00 15704.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 460 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-10147 VMS LED (Overhead) Each =================================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 2.00 120608.25 120608.25 120608.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 120608.25 120608.25 120608.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 120608.25 120608.25 120608.25 =============== 614-10160 Sig Head B-Plates Each =================================================== NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 31.00 100.00 290.00 290.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 31.00 100.00 290.00 290.00 SHE2254-092 SH225 AND 17TH PLACE IMPROVEM 10/18/18 2.00 263.20 448.00 539.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 56.00 130.00 187.88 228.33 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 58.00 134.59 194.67 239.04 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 89.00 122.54 205.99 256.79 =============== 614-10245 LUS LED (Single Faced) Each =================================================== IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 12.00 4000.00 26795.79 24000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 12.00 4000.00 26795.79 24000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 4000.00 26795.79 24000.00 =============== 614-30110 Btrfly Str Each =================================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 40036.46 40036.46 40036.46 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 40036.46 40036.46 40036.46 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 40036.46 40036.46 40036.46 =============== 614-31600 Monotube Overhead Sign Cant (16 In Dia) Each =================================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 2.00 34747.28 34747.28 34747.28 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 34747.28 34747.28 34747.28 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 34747.28 34747.28 34747.28 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 461 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-31800 Monotube Overhead Sign Cant (18 In Dia) Each =================================================== NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 2.00 35000.00 40000.00 41000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 35000.00 40000.00 41000.00 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 2.00 45000.00 34812.75 37000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 45000.00 34812.75 37000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 40000.00 36541.83 39000.00 =============== 614-32000 Monotube Overhead Sign Cant (20 In Dia) Each =================================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 2.00 42459.53 42459.53 42459.53 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 42459.53 42459.53 42459.53 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 42459.53 42459.53 42459.53 =============== 614-32400 Monotube Overhead Sign Cant (24 In Dia) Each =================================================== FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 1.00 45000.00 53082.00 50000.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 2.00 45000.00 47000.00 48000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 45000.00 50041.00 48666.67 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 1.00 50323.63 50323.63 50323.63 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 1.00 50000.00 43593.75 41500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 50161.82 44939.73 45911.82 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 4.00 43959.75 43959.75 43959.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 43959.75 43959.75 43959.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 45684.74 47109.74 45962.51 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 462 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-32900 Inst Monotube Overhead Sign Cant Each =================================================== NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 3.00 8000.00 10098.06 6196.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 8000.00 10098.06 6196.12 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 1.00 12000.00 11380.50 9760.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 12000.00 11380.50 9760.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 5.00 10000.00 13782.71 19000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 10000.00 13782.71 19000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 9555.56 12641.42 13705.37 =============== 614-42000 Monotube Overhead Sign Brdg (20 In Dia) Each =================================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 87046.90 87046.90 87046.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 87046.90 87046.90 87046.90 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 87046.90 87046.90 87046.90 =============== 614-42400 Monotube Overhead Sign Brdg (24 In Dia) Each =================================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 3.00 104651.55 104651.55 104651.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 104651.55 104651.55 104651.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 104651.55 104651.55 104651.55 =============== 614-42500 Monotube Overhead Sign Brdg (Inst Only) Each =================================================== NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 2.00 10000.00 15816.05 16632.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 10000.00 15816.05 16632.10 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 463 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-42500 Monotube Overhead Sign Brdg (Inst Only) Each =================================================== IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 9.00 20000.00 19494.71 20000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9.00 20000.00 19494.71 20000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 18181.82 19126.85 19387.65 =============== 614-70000 Prog Traf Sig Face Each =================================================== STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 3.00 1000.00 5047.47 5399.89 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 1000.00 5047.47 5399.89 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 1000.00 5047.47 5399.89 =============== 614-70024 1310nm SFP Optic Module Each =================================================== NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 4.00 400.00 552.50 575.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 400.00 552.50 575.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 6.00 375.00 477.80 471.19 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 18.00 400.00 328.33 260.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 24.00 393.75 374.32 312.80 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 3.00 361.66 361.66 361.66 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 361.66 361.66 361.66 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 73.00 400.00 259.50 198.00 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 70.00 650.00 531.67 970.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 464 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-70024 1310nm SFP Optic Module Each =================================================== ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 28.00 500.00 1103.56 500.00 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 40.00 575.00 433.67 281.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 4.00 358.05 358.05 358.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 215.00 526.20 493.90 507.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 246.00 509.22 482.71 487.47 =============== 614-70026 CWDM Multiplexor Demultiplexor Module Each =================================================== NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 2.00 5000.00 9631.00 9150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 5000.00 9631.00 9150.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 4.00 9436.21 9436.21 9436.21 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 9436.21 9436.21 9436.21 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 12.00 10000.00 9810.67 9700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 12.00 10000.00 9810.67 9700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18.00 9319.16 9754.67 9580.27 =============== 614-70028 CWDM SFP Optic Module Each =================================================== NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 36.00 800.00 996.67 925.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 36.00 800.00 996.67 925.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 34.00 1020.31 1020.31 1020.31 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 34.00 1020.31 1020.31 1020.31 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 12.00 2000.00 836.00 329.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 465 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-70028 CWDM SFP Optic Module Each =================================================== NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 140.00 950.00 908.67 693.00 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 6.00 1650.00 1251.33 869.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 12.00 1010.10 1010.10 1010.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 170.00 1053.07 916.49 695.90 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 240.00 1010.47 935.54 776.22 =============== 614-70030 Optical Attenuator Each =================================================== NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 4.00 90.00 170.00 175.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 90.00 170.00 175.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 6.00 130.07 125.46 123.83 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 54.00 110.00 99.00 69.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 60.00 112.01 102.41 74.48 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 22.00 98.64 98.64 98.64 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 22.00 98.64 98.64 98.64 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 85.00 100.00 85.50 40.00 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 198.00 75.00 73.33 48.00 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 28.00 100.00 89.70 100.00 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 46.00 200.00 117.33 87.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 16.00 97.65 97.65 97.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 373.00 98.96 83.69 57.02 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 459.00 100.57 86.87 62.33 =============== 614-70032 Optical Filter Each =================================================== NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 64.00 500.00 973.33 880.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 64.00 500.00 973.33 880.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 466 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-70032 Optical Filter Each =================================================== C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 64.00 1281.21 1281.21 1281.21 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 64.00 1281.21 1281.21 1281.21 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 224.00 550.00 557.67 433.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 20.00 1268.40 1268.40 1268.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 244.00 608.89 578.21 501.48 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 372.00 705.82 705.69 700.75 =============== 614-70112 Traf Sig Face (12) Each =================================================== NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 3.00 660.00 527.50 550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 660.00 527.50 550.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 660.00 527.50 550.00 =============== 614-70150 Ped Sig Face (16) (Countdown) Each =================================================== STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 20.00 625.00 565.00 560.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 12.00 900.00 448.00 465.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 32.00 728.13 531.57 524.38 NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPL 04/05/18 2.00 750.00 538.67 456.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 4.00 715.51 596.85 650.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 26.00 560.00 526.38 520.50 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 24.00 625.00 850.00 850.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 56.00 605.75 586.71 668.66 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 14.00 600.00 702.50 613.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 14.00 600.00 702.50 613.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 467 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-70150 Ped Sig Face (16) (Countdown) Each =================================================== FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 8.00 635.00 670.15 635.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 32.00 500.00 626.93 684.98 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 40.00 527.00 637.22 674.98 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 142.00 610.58 602.91 632.44 =============== 614-70200 Access Ped Sig Each =================================================== STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 16.00 1300.00 1313.02 1282.08 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16.00 1300.00 1313.02 1282.08 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 1300.00 1313.02 1282.08 =============== 614-70225 Traf Sig Face (12-12) Each =================================================== NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 10.00 800.00 658.33 650.00 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 34.00 650.00 545.33 501.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 44.00 684.09 571.02 534.86 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 44.00 684.09 571.02 534.86 =============== 614-70336 Traf Sig Face (12-12-12) Each =================================================== STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 51.00 1200.00 678.33 715.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 39.00 850.00 635.00 660.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 90.00 1048.33 663.70 691.17 NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPL 04/05/18 12.00 925.00 719.67 574.00 STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 7.00 725.00 816.25 940.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 10.00 846.05 780.93 860.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 40.00 900.00 713.96 695.83 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 468 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-70336 Traf Sig Face (12-12-12) Each =================================================== NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 36.00 1116.67 1333.33 1333.33 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 105.00 960.34 805.79 932.39 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 12.00 775.00 888.50 860.00 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 47.00 800.00 948.00 878.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 23.00 675.00 739.50 690.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 82.00 761.28 857.05 822.63 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 2.00 1000.00 775.00 820.00 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 8.00 800.00 878.45 825.00 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 28.00 900.00 869.00 900.00 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 1.00 1000.00 946.78 1016.10 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 82.00 375.00 766.30 863.94 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 46.00 800.00 806.00 633.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 167.00 611.68 798.50 804.89 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 444.00 810.27 788.79 815.27 =============== 614-70448 Traf Sig Face (12-12-12-12) Each =================================================== STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 4.00 1300.00 1308.75 1700.00 STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 12.00 1175.00 869.00 805.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16.00 1206.25 1004.31 1028.75 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 9.00 1200.11 1017.96 1100.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 17.00 1200.00 1052.39 1024.57 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 25.00 1400.00 1600.00 1600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 51.00 1298.06 1132.88 1319.95 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 4.00 1200.00 1162.50 1085.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 469 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-70448 Traf Sig Face (12-12-12-12) Each =================================================== STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 11.00 1100.00 984.25 950.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 15.00 1126.67 1047.16 986.00 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 14.00 1400.00 989.25 882.00 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 8.00 1000.00 1452.65 1185.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 19.00 750.00 1068.93 1252.72 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 41.00 1020.73 1132.23 1112.92 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 123.00 1172.77 1104.11 1172.34 =============== 614-70560 Traf Sig Face (12-12-12-12-12) Each =================================================== STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 2.00 1350.00 1136.25 1215.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 1350.00 1136.25 1215.00 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 8.00 1200.00 1321.50 1398.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 1200.00 1321.50 1398.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 1230.00 1259.75 1361.40 =============== 614-72740 Blank Out Sign(LED)(Sing Fac) Each =================================================== ITSSW01-833 ABOUT 1.5 MILES NORTH OF THE 01/18/18 4.00 17000.00 7468.75 4880.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 2.00 19000.00 5193.81 5447.53 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 2.00 15000.00 22630.43 19260.86 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 17000.00 8315.74 8617.10 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 6.00 12000.00 5500.00 5500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 12000.00 5500.00 5500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 14857.14 7893.38 7281.20 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 470 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-72741 Blank Out Sign (LED)(SPD RDR) Each =================================================== FSA0711-020 SH 71 & SH 94: PUNKIN CENTER 05/03/18 2.00 24000.00 10166.67 9500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 24000.00 10166.67 9500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 24000.00 10166.67 9500.00 =============== 614-72745 Blank Out Sign Mntig Support & Wiring Each =================================================== BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 2.00 330.00 710.93 1159.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 330.00 710.93 1159.05 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 330.00 710.93 1159.05 =============== 614-72804 Overheight Veh Warn Siren Each =================================================== ITSSW01-833 ABOUT 1.5 MILES NORTH OF THE 01/18/18 2.00 6000.00 1754.25 1587.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 6000.00 1754.25 1587.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 6000.00 1754.25 1587.00 =============== 614-72806 Overheight Veh Det (LIDAR) Each =================================================== ITSSW01-833 ABOUT 1.5 MILES NORTH OF THE 01/18/18 4.00 17500.00 14857.00 14533.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 17500.00 14857.00 14533.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 17500.00 14857.00 14533.00 =============== 614-72830 Communications Cabinet Each =================================================== C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 2.00 14823.03 14823.03 14823.03 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 14823.03 14823.03 14823.03 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 3.00 11000.00 13255.33 12450.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 471 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-72830 Communications Cabinet Each =================================================== IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 1.00 17000.00 25695.39 22000.00 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 16.00 25000.00 14382.67 14023.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 4.00 13878.90 13878.90 13878.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 24.00 21063.15 14891.74 14134.73 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26.00 20583.14 14889.69 14187.68 =============== 614-72831 Comm Cabinet (Type 1) Each =================================================== NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 11.00 9000.00 12575.00 9975.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 11.00 9000.00 12575.00 9975.00 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 8.00 11000.00 11583.00 11000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8.00 11000.00 11583.00 11000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19.00 9842.11 12157.32 10406.58 =============== 614-72832 Comm Cabinet (Type 2) Each =================================================== ITSSW01-833 ABOUT 1.5 MILES NORTH OF THE 01/18/18 4.00 10000.00 9550.25 9915.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 10000.00 9550.25 9915.00 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 6.00 10000.00 15708.33 12975.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 10000.00 15708.33 12975.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 2.00 15765.91 15765.91 15765.91 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 15765.91 15765.91 15765.91 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 7.00 11000.00 12741.67 12250.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 472 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-72832 Comm Cabinet (Type 2) Each =================================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 3.00 15608.25 15608.25 15608.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 12382.48 13099.99 13257.48 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 22.00 11607.12 13024.76 12800.75 =============== 614-72836 Conflict Monitor Each =================================================== NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 2.00 1000.00 882.50 920.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1000.00 882.50 920.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 3.00 1020.00 1221.11 1194.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 1020.00 1221.11 1194.42 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 35.00 1000.00 801.00 689.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 35.00 1000.00 801.00 689.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 1001.50 835.41 738.46 =============== 614-72845 Overheight Veh Det Sys Controller Each =================================================== ITSSW01-833 ABOUT 1.5 MILES NORTH OF THE 01/18/18 4.00 12500.00 7206.50 6551.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 12500.00 7206.50 6551.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 12500.00 7206.50 6551.00 =============== 614-72854 Traf Ctrl Cabinet Each =================================================== NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 3.00 25000.00 19000.00 19000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 25000.00 19000.00 19000.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 1.00 17000.00 24591.50 23000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 17000.00 24591.50 23000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 23000.00 22727.67 20000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 473 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-72855 Traf Sig Ctrl Cabinet Each =================================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 1.00 25000.00 36000.00 35000.00 STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 1.00 12500.00 16336.67 15600.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 2.00 1000.00 14592.50 15200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 9875.00 19931.11 20250.00 STAR400-347 Various intersections across 04/12/18 25.00 14000.00 20923.33 18000.00 STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 1.00 25000.00 17838.75 16785.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 1.00 23100.00 17361.11 18000.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 3.00 14000.00 15620.29 15341.16 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 30.00 14670.00 19919.74 17693.62 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 3.00 27500.00 27497.50 26725.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 27500.00 27497.50 26725.00 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 16.00 13000.00 15166.75 14082.00 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 1.00 18500.00 32083.84 28000.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 4.00 12500.00 24941.50 29031.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 21.00 13166.67 18001.83 17592.19 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 58.00 14458.62 19323.53 18300.34 =============== 614-72860 Ped Push Button Each =================================================== STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 5.00 900.00 1580.00 1800.00 STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 18.00 475.00 1275.00 1390.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 6.00 900.00 278.00 290.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 29.00 636.21 1206.81 1233.10 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 4.00 692.13 1380.56 1400.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 474 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-72860 Ped Push Button Each =================================================== STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 20.00 435.00 302.72 295.87 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 24.00 477.86 551.45 479.89 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 9.00 400.00 353.00 310.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9.00 400.00 353.00 310.00 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 5.00 650.00 286.18 245.00 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 19.00 500.00 1146.73 1201.91 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 10.00 600.00 902.88 825.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 30.00 275.00 1237.22 1610.64 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 64.00 421.88 1068.54 1259.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 126.00 480.31 951.77 1037.28 =============== 614-72861 Ped Push Button (Inst Only) Each =================================================== STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 4.00 125.00 517.55 443.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 125.00 517.55 443.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 125.00 517.55 443.75 =============== 614-72862 Ped Push Button (Spec) Each =================================================== STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 6.00 1000.00 1798.27 1650.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 1000.00 1798.27 1650.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 1000.00 1798.27 1650.00 =============== 614-72863 Ped Push Button Post Assem Each =================================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 14.00 1500.00 3125.00 3000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 475 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-72863 Ped Push Button Post Assem Each =================================================== STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 6.00 1000.00 1646.25 1800.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 6.00 1500.00 1486.00 1550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 26.00 1384.62 2263.16 2388.46 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 12.00 1600.00 1749.74 1703.96 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 26.00 4000.00 2700.00 2700.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 1.00 1750.00 2581.02 2062.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 39.00 3203.85 2102.99 2377.18 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 5.00 1500.00 1956.00 1422.00 C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 6.00 1850.00 3119.50 1920.00 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 39.00 2250.00 2380.45 2076.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 50.00 2127.00 2451.46 1992.50 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 3.00 1700.00 1110.16 905.00 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 23.00 2000.00 1305.88 1393.52 C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 4.00 2000.00 1930.60 1698.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 30.00 1970.00 1381.14 1385.27 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 145.00 2251.03 2069.77 2041.33 =============== 614-72866 Fire Preempt Unit + Timer Each =================================================== NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 6.00 6000.00 5000.00 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 6000.00 5000.00 5000.00 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 2.00 5000.00 5321.00 3857.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 5000.00 5321.00 3857.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 476 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-72866 Fire Preempt Unit + Timer Each =================================================== FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 8.00 4000.00 5400.62 5825.46 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8.00 4000.00 5400.62 5825.46 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 4875.00 5335.80 5269.86 =============== 614-72871 Loop Detect Wire (Prefab) Spec Lin Foot =============================================== NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 766.00 12.00 14.74 14.47 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 766.00 12.00 14.74 14.47 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 766.00 12.00 14.74 14.47 =============== 614-72873 Loop Detec Wire Prefab (Install Only) Lin Foot =============================================== NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 148.00 10.00 26.50 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 148.00 10.00 26.50 22.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 148.00 10.00 26.50 22.00 =============== 614-72875 Loop Detect Wire Lin Foot =============================================== NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 400.00 5.00 11.31 15.25 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 728.00 4.00 3.88 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,128.00 4.35 7.77 7.99 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 20,816.00 4.00 4.19 4.11 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20,816.00 4.00 4.19 4.11 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 4,680.00 4.00 4.38 4.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,680.00 4.00 4.38 4.20 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 477 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-72875 Loop Detect Wire Lin Foot =============================================== NHPP0702-366 I-70 Avon to Vail 11/08/18 1,000.00 8.00 11.58 16.00 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 2,548.00 5.00 6.21 6.68 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 18,130.00 4.00 5.42 4.50 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 800.00 8.40 8.40 8.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 22,478.00 4.45 5.92 5.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 49,102.00 4.21 5.00 4.80 =============== 614-72878 Detect Amp (Loop) (4) Each =================================================== SHER100-302 RAMP METERING - DENVER METRO 12/13/18 23.00 1200.00 816.00 513.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 23.00 1200.00 816.00 513.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 23.00 1200.00 816.00 513.00 =============== 614-72880 Detect Amp (Loop) Each =================================================== NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 1.00 2000.00 4820.00 3640.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 2000.00 4820.00 3640.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2000.00 4820.00 3640.00 =============== 614-72882 Detect (Micro) Each =================================================== STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 15.00 1500.00 2000.97 1988.87 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 15.00 1500.00 2000.97 1988.87 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15.00 1500.00 2000.97 1988.87 =============== 614-72884 Detect (Micro Wave) Each =================================================== NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 66.00 8500.00 9087.75 8391.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 478 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-72884 Detect (Micro Wave) Each =================================================== SHER100-302 RAMP METERING - DENVER METRO 12/13/18 1.00 7500.00 10477.00 10081.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 67.00 8485.07 9103.36 8416.22 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 67.00 8485.07 9103.36 8416.22 =============== 614-72885 Detect (Spec) Each =================================================== NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 6.00 13000.00 11115.00 11500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 13000.00 11115.00 11500.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 18.00 10000.00 8666.67 8666.67 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 18.00 10000.00 8666.67 8666.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 24.00 10750.00 9646.00 9375.00 =============== 614-72886 Intersection Detect Sys (Camera) Each =================================================== STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 3.00 10000.00 10363.75 6920.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 4.00 6000.00 6829.63 5600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7.00 7714.29 8007.67 6165.71 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 8.00 6850.00 7368.00 7900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 6850.00 7368.00 7900.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 20.00 5000.00 8730.50 9000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 20.00 5000.00 8730.50 9000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 35.00 5965.71 8260.08 8181.71 =============== 614-72887 Detect (Microwave Veh) Each =================================================== NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPL 04/05/18 4.00 9000.00 7593.67 7621.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 479 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-72887 Detect (Microwave Veh) Each =================================================== NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 16.00 8500.00 10025.00 9625.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20.00 8600.00 9538.73 9224.20 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 4.00 9000.00 6538.50 7060.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 9000.00 6538.50 7060.00 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 4.00 10000.00 9113.55 9100.00 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 17.00 8000.00 10949.00 10552.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 10.00 12831.00 12831.00 12831.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 31.00 9816.45 10728.15 11099.81 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 55.00 9314.73 9686.23 10123.96 =============== 614-72889 Detect (Micro) (Non-Invasive) Each =================================================== NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 2.00 1300.00 780.00 810.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1300.00 780.00 810.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 18.00 770.00 1244.08 1216.33 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 18.00 770.00 1244.08 1216.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 823.00 1219.66 1175.70 =============== 614-72895 Vehicle Detect Sys (Single Camera) Each =================================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 16.00 7500.00 9612.50 9000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16.00 7500.00 9612.50 9000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 7500.00 9612.50 9000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 480 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-72896 Inst Intersect Detect Sys (Camera) Each =================================================== STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 2.00 5500.00 605.00 875.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 5500.00 605.00 875.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 5500.00 605.00 875.00 =============== 614-73005 Piezo (Elec)(CL II) Each =================================================== NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 4.00 3000.00 3525.00 2600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 3000.00 3525.00 2600.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 4.00 4000.00 3486.19 2780.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 2.00 10431.75 10431.75 10431.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 6143.92 4257.92 5330.58 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 4886.35 3913.02 4238.35 =============== 614-75855 Inst Traf Sig Ctrler Cab Each =================================================== STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 3.00 3400.00 2270.00 1350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 3400.00 2270.00 1350.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 3400.00 2270.00 1350.00 =============== 614-79886 Furn Int Detect Sys (Camera) Each =================================================== STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 4.00 5500.00 5859.25 8800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 5500.00 5859.25 8800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 5500.00 5859.25 8800.00 =============== 614-80000 Flash Beacon Each =================================================== STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 3.00 3250.00 2906.67 2050.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 481 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-80000 Flash Beacon Each =================================================== NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 8.00 500.00 2796.00 1092.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11.00 1250.00 2835.84 1353.27 FSA0711-020 SH 71 & SH 94: PUNKIN CENTER 05/03/18 2.00 2500.00 7100.00 8000.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 4.00 2370.00 3018.71 2914.82 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 2413.33 4131.79 4609.88 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 2.00 2500.00 2837.67 2650.00 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 7.00 5500.00 2416.67 2000.00 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 34.00 3000.00 1801.00 2178.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 43.00 3383.72 1976.16 2170.98 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 60.00 2895.50 2359.02 2264.95 =============== 614-80003 Rect Rapid Flash Beacon Each =================================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 13.00 7643.58 7586.25 7586.25 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 6.00 12000.00 2816.19 2400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 19.00 9019.29 4258.30 5948.49 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19.00 9019.29 4258.30 5948.49 =============== 614-80004 Flash Beacon (Spec) Each =================================================== ITSSW01-833 ABOUT 1.5 MILES NORTH OF THE 01/18/18 4.00 2000.00 603.00 537.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 4.00 12500.00 9711.25 10000.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 7250.00 6675.17 5268.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 7250.00 6675.17 5268.50 =============== 614-80020 Travel Time Indicator (Install) Each =================================================== IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 2.00 1500.00 3029.38 2900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 1500.00 3029.38 2900.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1500.00 3029.38 2900.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 482 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-80385 Rumble Strip Lin Foot =============================================== STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 68.00 60.00 46.98 30.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 83,129.00 0.20 0.14 0.35 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 20,654.00 0.50 0.15 0.28 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 1,910.00 4.00 2.84 1.74 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 5,475.00 4.00 1.46 2.82 NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 17,487.00 0.30 0.37 0.30 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 44,105.00 0.25 0.19 0.21 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 172,828.00 0.44 0.32 0.41 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 30,486.00 0.50 0.14 0.22 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 30,486.00 0.50 0.14 0.22 FBR060A-022 SH 60 over the South Platte 07/12/18 3,984.00 0.50 2.13 2.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 124,010.00 0.14 0.14 0.14 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 2,795.00 3.00 2.98 1.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 130,789.00 0.21 1.01 0.22 SHE2254-092 SH225 AND 17TH PLACE IMPROVEM 10/18/18 72.00 0.41 293.33 258.00 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 49,421.00 0.25 0.18 0.15 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 85,459.00 0.50 0.10 0.10 NHPP0702-366 I-70 Avon to Vail 11/08/18 105,864.00 0.20 0.21 0.47 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 79,369.00 0.40 0.10 0.09 STAR100-279 FY20 HMA PREVENTATIVE MAINTEN 12/13/18 2,415.00 1.00 4.00 1.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 105,173.00 0.14 0.14 0.14 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 427,773.00 0.29 0.23 0.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 761,876.00 0.32 0.32 0.28 =============== 614-80386 Rumble Strip (Spec) Lin Foot =============================================== STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 46.00 150.00 42.40 40.20 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 483 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-80386 Rumble Strip (Spec) Lin Foot =============================================== IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 35,255.00 2.00 0.70 0.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 35,301.00 2.19 0.74 0.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 35,301.00 2.19 0.74 0.65 =============== 614-80387 Rumble Strip (Grind) Lin Foot =============================================== FSA0711-020 SH 71 & SH 94: PUNKIN CENTER 05/03/18 100.00 25.00 38.67 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 100.00 25.00 38.67 45.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 100.00 25.00 38.67 45.00 =============== 614-80391 Rumble Strip (Grind)(Asphalt) Lin Foot =============================================== NHPP5502-096 US550 STRIPING & RUMBLE STRIP 03/01/18 72,600.00 0.75 0.41 0.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 72,600.00 0.75 0.41 0.40 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 10,694.00 0.25 1.13 0.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10,694.00 0.25 1.13 0.65 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 474.00 0.50 13.05 8.00 STA052A-045 SH 52B NEW RAYMER SOUTH 12/13/18 65,247.00 0.15 0.21 0.19 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 65,721.00 0.15 0.40 0.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 149,015.00 0.45 0.44 0.35 =============== 614-80392 Rumble Strip (Grind)(Conc) Lin Foot =============================================== FSAR200-247 US 287 FROM MP 0.00 (STATE LI 03/08/18 512,160.00 0.39 0.69 0.58 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 512,160.00 0.39 0.69 0.58 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 484 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-80392 Rumble Strip (Grind)(Conc) Lin Foot =============================================== NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 2,348.00 1.00 2.50 0.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,348.00 1.00 2.50 0.95 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 514,508.00 0.39 0.70 0.58 =============== 614-81000 Sig-Light Pole Steel Each =================================================== NH0242-071 US 24 & 31ST STREET and US24 05/03/18 1.00 13000.00 12701.85 12000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 13000.00 12701.85 12000.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 13965.00 13965.00 13965.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 13965.00 13965.00 13965.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 13482.50 12882.30 12982.50 =============== 614-81011 Inst Sig-Light Pole Steel (1) Each =================================================== NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 12.00 4750.00 3650.00 3650.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12.00 4750.00 3650.00 3650.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 4750.00 3650.00 3650.00 =============== 614-81020 Sig-Light Pole Steel (2) Each =================================================== NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 1.00 28500.00 36299.67 34000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 28500.00 36299.67 34000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 28500.00 36299.67 34000.00 =============== 614-81125 Sig-Light Pole Steel (1-25 Ft) Each =================================================== STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 1.00 12250.00 14062.67 15200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 12250.00 14062.67 15200.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 485 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-81125 Sig-Light Pole Steel (1-25 Ft) Each =================================================== FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 1.00 9500.00 12233.92 12292.69 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 9500.00 12233.92 12292.69 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 10875.00 13017.67 13746.35 =============== 614-81130 Sig-Light Pole Steel (1-30 Ft) Each =================================================== NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPL 04/05/18 1.00 24000.00 16954.33 19333.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 24000.00 16954.33 19333.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 1.00 14000.00 13863.25 12000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 14000.00 13863.25 12000.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 5.00 12000.00 12556.29 12453.14 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 12000.00 12556.29 12453.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 14000.00 13238.58 13371.24 =============== 614-81135 Sig-Light Pole Steel (1-35 Ft) Each =================================================== STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 1.00 13500.00 14447.67 14800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 13500.00 14447.67 14800.00 STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 1.00 13000.00 15372.50 17600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 13000.00 15372.50 17600.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 486 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-81135 Sig-Light Pole Steel (1-35 Ft) Each =================================================== NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 1.00 14000.00 15020.33 15200.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 4.00 14000.00 14029.84 14193.37 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 2.00 13000.00 15513.00 14639.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 7.00 13714.29 14504.66 14464.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 13611.11 14607.80 14850.16 =============== 614-81140 Sig-Light Pole Steel (1-40 Ft) Each =================================================== STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 1.00 14700.00 16749.00 16050.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 14700.00 16749.00 16050.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 3.00 15000.00 16377.88 16214.51 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 15000.00 16377.88 16214.51 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 1.00 15000.00 19118.36 18150.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 7.00 15000.00 14401.43 14538.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8.00 15000.00 15116.11 14990.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 14975.00 15533.61 15384.68 =============== 614-81145 Sig-Light Pole Steel (1-45 Ft) Each =================================================== STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 8.00 11000.00 16161.00 16500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 11000.00 16161.00 16500.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 1.00 14775.00 21505.56 20000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 487 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-81145 Sig-Light Pole Steel (1-45 Ft) Each =================================================== STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 3.00 16660.00 17319.57 17138.26 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 16188.75 18714.90 17853.70 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 1.00 22000.00 17248.00 16200.00 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 2.00 15500.00 16030.00 15025.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 1.00 14500.00 16070.00 15000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 16875.00 16563.43 15312.50 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 3.00 16500.00 19494.23 18500.00 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 2.00 16000.00 16353.00 16000.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 5.00 15000.00 17011.68 17858.97 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 3.00 17000.00 16998.67 16046.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 13.00 15961.54 17675.06 17302.53 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 29.00 14750.17 17362.01 16882.68 =============== 614-81150 Sig-Light Pole Steel (1-50 Ft) Each =================================================== NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 3.00 15500.00 15842.50 16500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 15500.00 15842.50 16500.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 1.00 14900.00 22966.67 21000.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 1.00 15240.00 15986.71 15657.84 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 15070.00 20174.68 18328.92 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 3.00 17500.00 16765.00 15900.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 1.00 15000.00 16407.25 15500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 16875.00 16621.90 15800.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 488 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-81150 Sig-Light Pole Steel (1-50 Ft) Each =================================================== FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 1.00 16500.00 17863.10 18899.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 16500.00 17863.10 18899.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 16064.00 17815.77 16825.72 =============== 614-81155 Sig-Light Pole Steel (1-55 Ft) Each =================================================== STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 3.00 15000.00 16617.33 16100.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 1.00 15000.00 16033.50 16700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 15000.00 16511.18 16250.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 3.00 19260.00 17074.66 16730.63 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 19260.00 17074.66 16730.63 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 2.00 19500.00 17103.00 16181.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 3.00 16000.00 17115.25 16000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 17400.00 17112.19 16072.40 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 2.00 16000.00 16948.33 17000.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 1.00 17000.00 19791.09 21307.34 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 3.00 18000.00 19402.00 18431.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 17166.67 18709.07 18433.39 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18.00 17098.89 17513.56 17008.57 =============== 614-81160 Sig-Light Pole Steel (1-60 Ft) Each =================================================== STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 2.00 21500.00 24987.50 23995.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 21500.00 24987.50 23995.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 21500.00 24987.50 23995.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 489 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-81165 Sig-Light Pole Steel (1-65 Ft) Each =================================================== STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 1.00 23500.00 28628.00 24316.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 2.00 23000.00 23751.25 21500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 23166.67 24726.60 22438.67 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 1.00 25000.00 25521.33 25000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 25000.00 25521.33 25000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 23625.00 24910.00 23079.00 =============== 614-81175 Sig-Light Pole Steel (1-75 Ft) Each =================================================== NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 3.00 27000.00 29605.50 30850.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 27000.00 29605.50 30850.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 1.00 28000.00 33673.83 31500.00 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 1.00 25500.00 28991.50 28481.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 26750.00 32503.25 29990.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 26900.00 31261.36 30506.20 =============== 614-81255 Sig-Light Pole Steel (2-55 Ft) Each =================================================== STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 1.00 32000.00 35662.50 29210.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 1.00 32000.00 43016.67 43000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 32000.00 40075.00 36105.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 32000.00 40075.00 36105.00 =============== 614-82020 Sig Pole Steel (2) Each =================================================== STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 1.00 25000.00 17481.00 22975.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 25000.00 17481.00 22975.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 490 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-82020 Sig Pole Steel (2) Each =================================================== NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPL 04/05/18 1.00 40000.00 39837.67 42628.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 40000.00 39837.67 42628.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 32500.00 28659.33 32801.50 =============== 614-84000 Traf Sig Ped Pole Steel Each =================================================== STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 12.00 2750.00 2613.33 1900.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 3.00 2250.00 1252.50 1300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15.00 2650.00 2418.93 1780.00 NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPL 04/05/18 1.00 2500.00 2839.00 2757.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 2.00 3027.75 3305.56 3600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 2851.83 3212.24 3319.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 1.00 2200.00 2818.17 2700.00 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 1.00 2000.00 2826.00 2260.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 2100.00 2820.13 2480.00 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 3.00 2000.00 2628.64 2300.00 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 2.00 2000.00 3733.78 3882.10 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 6.00 1500.00 2604.76 2200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 11.00 1727.27 2781.94 2533.11 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 31.00 2306.63 2710.02 2241.33 =============== 614-84100 Traf Sig Ped Pole Alum Each =================================================== STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 2.00 1510.00 1570.43 1506.72 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 1510.00 1570.43 1506.72 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 491 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-84100 Traf Sig Ped Pole Alum Each =================================================== C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 1.00 3171.32 3171.32 3171.32 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 3171.32 3171.32 3171.32 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 9.00 2000.00 2068.33 1500.00 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 34.00 1700.00 2381.00 2488.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 43.00 1762.79 2315.56 2281.21 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 46.00 1782.42 2278.56 2266.89 =============== 614-84455 Inst Traf Sig Ped Pole Each =================================================== NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 6.00 1500.00 750.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 1500.00 750.00 100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 1500.00 750.00 100.00 =============== 614-85003 Impact Atten (LM) Each =================================================== NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 1.00 30000.00 28710.64 29540.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 30000.00 28710.64 29540.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 4.00 21683.10 21683.10 21683.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 21683.10 21683.10 21683.10 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 5.00 23253.13 23253.13 23253.13 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 23253.13 23253.13 23253.13 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 23299.81 24449.28 23253.81 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 492 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-85130 Impact Atten (Quadguard II) Each =================================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 26250.00 21287.87 21287.87 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 26250.00 21287.87 21287.87 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 26250.00 21287.87 21287.87 =============== 614-86003 Spread Spectrum Radio (Contact Closure) Each =================================================== NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 2.00 13000.00 7090.67 14500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 13000.00 7090.67 14500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 13000.00 7090.67 14500.00 =============== 614-86006 Telemetry (Master) Each =================================================== NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 10.00 3700.00 2605.67 1940.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 3700.00 2605.67 1940.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 3700.00 2605.67 1940.00 =============== 614-86007 Serial to IP Converter Each =================================================== NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 56.00 1750.00 1235.00 1940.00 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 22.00 1000.00 1159.00 742.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 78.00 1538.46 1213.56 1602.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 78.00 1538.46 1213.56 1602.10 =============== 614-86010 DSRC (Roadside Unit) Each =================================================== C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 6.00 8971.67 8971.67 8971.67 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 8971.67 8971.67 8971.67 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 7.00 8881.95 8881.95 8881.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 7.00 8881.95 8881.95 8881.95 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13.00 8923.36 8923.36 8923.36 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 493 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-86097 Wireless Detection Access Point Each =================================================== NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 18.00 7800.00 7176.67 10800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 18.00 7800.00 7176.67 10800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18.00 7800.00 7176.67 10800.00 =============== 614-86098 Wireless Detection Repeater Each =================================================== NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 39.00 3700.00 3356.67 4975.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 39.00 3700.00 3356.67 4975.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 39.00 3700.00 3356.67 4975.00 =============== 614-86099 Wireless Detection Sensor Each =================================================== NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 181.00 900.00 1025.67 1072.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 181.00 900.00 1025.67 1072.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 181.00 900.00 1025.67 1072.00 =============== 614-86105 Telemetry (Field) Each =================================================== STAR400-347 Various intersections across 04/12/18 6.00 2250.00 2389.33 2000.00 STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 1.00 2500.00 3796.25 2810.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 3.00 5000.00 7000.00 7000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 3100.00 3167.72 3581.00 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 1.00 3500.00 3712.17 3229.00 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 1.00 3000.00 5610.50 6021.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 3250.00 4186.75 4625.00 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 19.00 5000.00 3386.67 2000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 494 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-86105 Telemetry (Field) Each =================================================== IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 2.00 2000.00 6126.70 5700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 21.00 4714.29 3723.90 2352.38 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 33.00 4136.36 3619.80 2862.42 =============== 614-86106 Telemetry (Field)(Install Only) Each =================================================== NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 2.00 5000.00 4954.00 5408.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 5000.00 4954.00 5408.00 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 33.00 1000.00 795.00 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 33.00 1000.00 795.00 1000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 35.00 1228.57 956.51 1251.89 =============== 614-86248 Traf Ctrler (Type 2070LC) Each =================================================== NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 2.00 4500.00 4895.00 5100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 4500.00 4895.00 5100.00 NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPL 04/05/18 1.00 15000.00 31362.00 27771.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 3.00 4300.00 5376.71 5179.83 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 6975.00 10573.77 10827.62 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 35.00 4000.00 5070.75 4568.00 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 18.00 7000.00 5883.33 7900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 53.00 5018.87 5296.93 5699.62 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 59.00 5133.90 5660.99 6026.96 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 495 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-86250 Ctrler (Ramp Metering) Each =================================================== SHER100-302 RAMP METERING - DENVER METRO 12/13/18 17.00 1400.00 2224.00 1582.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 17.00 1400.00 2224.00 1582.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17.00 1400.00 2224.00 1582.00 =============== 614-86734 WIM Station (Ty III) Each =================================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 148844.85 148844.85 148844.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 148844.85 148844.85 148844.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 148844.85 148844.85 148844.85 =============== 614-86737 Surface Sensor Each =================================================== NHPP0702-366 I-70 Avon to Vail 11/08/18 4.00 10000.00 9680.61 10870.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 10000.00 9680.61 10870.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 10000.00 9680.61 10870.00 =============== 614-86738 Sub-Surf Temp Probe Each =================================================== NHPP0702-366 I-70 Avon to Vail 11/08/18 1.00 3000.00 6197.29 5030.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 3000.00 6197.29 5030.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 3000.00 6197.29 5030.00 =============== 614-86741 Weather Monitor System Each =================================================== NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 3.00 60000.00 64533.33 55600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 60000.00 64533.33 55600.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 89236.08 89236.08 89236.08 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 89236.08 89236.08 89236.08 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 67309.02 67003.61 64009.02 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 496 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-86748 Ctrler (Ty 2070) Each =================================================== STAR400-347 Various intersections across 04/12/18 71.00 3700.00 4015.67 4000.00 STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 1.00 4500.00 5355.00 4105.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 72.00 3711.11 4040.35 4001.46 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 1.00 4200.00 5652.00 6160.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 4200.00 5652.00 6160.00 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 1.00 4500.00 4784.35 5500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 4500.00 4784.35 5500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 74.00 3728.38 4099.08 4050.88 =============== 614-86752 Fold-Over Tower (ITS) Each =================================================== NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 3.00 15000.00 21758.33 15900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 15000.00 21758.33 15900.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 15000.00 21758.33 15900.00 =============== 614-86800 Uninterrupted Power Supply Each =================================================== NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 2.00 5800.00 9525.00 9900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 5800.00 9525.00 9900.00 STAR400-347 Various intersections across 04/12/18 22.00 8250.00 6759.67 7000.00 STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 1.00 9000.00 7803.75 6565.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 1.00 10606.05 8981.48 9500.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 3.00 7700.00 9086.80 8547.21 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 497 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-86800 Uninterrupted Power Supply Each =================================================== NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 3.00 10000.00 8500.00 8500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 30.00 8473.54 7316.30 7373.55 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 1.00 26620.16 26620.16 26620.16 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 26620.16 26620.16 26620.16 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 16.00 8500.00 7232.75 6626.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 4.00 6000.00 7708.02 9333.07 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 3.00 26353.95 26353.95 26353.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 23.00 10393.99 8015.50 9670.01 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 56.00 9490.86 7797.71 8750.66 =============== 614-87006 Fiber Optic Term Panel (6 Fiber) Each =================================================== NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 17.00 600.00 665.67 580.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 17.00 600.00 665.67 580.00 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 8.00 750.00 657.25 529.00 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 29.00 700.00 533.33 820.00 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 4.00 700.00 907.63 750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 41.00 709.76 607.07 756.39 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 58.00 677.59 623.13 704.69 =============== 614-87010 Fiber Optic Cable (S Mode) (12 Fiber) Lin Foot =============================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 150.00 10.00 53.80 22.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 400.00 6.00 1.83 1.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 550.00 7.09 16.00 7.38 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 498 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-87010 Fiber Optic Cable (S Mode) (12 Fiber) Lin Foot =============================================== STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 525.00 5.00 9.19 8.77 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 21,430.00 3.00 2.43 1.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 21,955.00 3.05 2.65 1.97 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 10,775.00 3.63 3.63 3.63 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10,775.00 3.63 3.63 3.63 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 52,865.00 3.40 7.17 2.00 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 1,850.00 3.00 13.29 5.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 2,080.00 5.00 10.77 10.00 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 20,730.00 5.00 2.83 2.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 6,575.00 3.60 3.60 3.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 84,100.00 3.84 6.27 2.39 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 117,380.00 3.69 5.47 2.45 =============== 614-87011 Fiber Optic Cable (S Mode) (24 Fiber) Lin Foot =============================================== NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 295.00 4.50 5.07 1.77 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 1,820.00 4.40 4.78 4.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,115.00 4.41 4.83 4.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,115.00 4.41 4.83 4.42 =============== 614-87012 Fiber Optic Term Panel (12 Fiber) Each =================================================== NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 2.00 750.00 383.50 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 750.00 383.50 400.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 3.00 850.00 646.27 630.08 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 850.00 646.27 630.08 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 499 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-87012 Fiber Optic Term Panel (12 Fiber) Each =================================================== NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 17.00 1200.00 813.50 684.00 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 17.00 1000.00 1287.33 1312.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 34.00 1100.00 1016.57 998.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 39.00 1062.82 964.90 939.03 =============== 614-87015 Buffer Tube Fan Out Kit Each =================================================== NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 2.00 1000.00 145.00 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1000.00 145.00 150.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 3.00 420.00 604.30 597.21 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 420.00 604.30 597.21 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 3.00 746.67 746.67 746.67 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 1.00 1000.00 2889.50 1821.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 1.00 600.00 394.75 450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 768.00 1066.45 902.20 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 16.00 600.00 144.00 44.00 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 68.00 1000.00 390.67 290.00 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 9.00 500.00 303.78 500.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 1.00 300.00 539.08 500.00 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 17.00 1000.00 95.00 66.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 6.00 739.20 739.20 739.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 117.00 887.48 304.89 264.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 127.00 873.51 330.04 295.94 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 500 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-87024 Fiber Optic Term Panel (24 Fiber) Each =================================================== C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 3.00 1397.88 1397.88 1397.88 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 1.00 1000.00 1034.25 900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 1298.41 1190.09 1273.41 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 26.00 1000.00 907.33 1200.00 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 5.00 750.00 1372.50 1000.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 1.00 400.00 1455.89 1300.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 6.00 1383.90 1383.90 1383.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 38.00 1011.93 1040.27 1205.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 42.00 1039.22 1049.39 1211.83 =============== 614-87144 Fiber Optic Termi Panel (144 Fiber) Each =================================================== NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 5.00 12000.00 15585.00 7275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 12000.00 15585.00 7275.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 12000.00 15585.00 7275.00 =============== 614-87315 Softwr System LUMP SUM =============================================== STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 1.00 470000.00 507729.44 436560.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 470000.00 507729.44 436560.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 470000.00 507729.44 436560.75 =============== 614-87320 CCTV Each =================================================== NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPL 04/05/18 1.00 5500.00 4822.67 3603.00 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 10.00 5000.00 5880.00 6500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 11.00 5045.45 5783.88 6236.64 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 2.00 13456.97 13456.97 13456.97 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 13456.97 13456.97 13456.97 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 501 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-87320 CCTV Each =================================================== NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 22.00 5000.00 4311.50 3446.00 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 18.00 5500.00 4921.67 5500.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 3.00 13322.40 13322.40 13322.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 43.00 5789.93 4725.17 4994.87 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 56.00 5917.52 5016.28 5541.00 =============== 614-87350 Test Fiber Optic Cable LUMP SUM =============================================== STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 1.00 2500.00 1643.33 3250.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 1.00 16500.00 520.00 540.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 9500.00 1194.00 1895.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 1.00 7000.00 3830.01 3775.02 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 1.00 12000.00 18400.00 13200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 9500.00 10074.29 8487.51 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 1.00 34524.85 34524.85 34524.85 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 1.00 1500.00 4402.25 7500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 18012.43 10426.77 21012.43 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 1.00 20000.00 13203.50 14679.00 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 1.00 70000.00 39716.67 50000.00 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 1.00 25000.00 8860.68 7500.00 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 1.00 5000.00 8340.67 5472.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 4272.45 4272.45 4272.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 24854.49 15780.08 16384.69 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 18027.03 11416.41 13155.76 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 502 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-87364 CCTV Pole w Low Dev (50 Ft) Each =================================================== C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 2.00 32470.45 32470.45 32470.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 32470.45 32470.45 32470.45 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 1.00 25000.00 26397.33 25000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 25000.00 26397.33 25000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 29980.30 28826.58 29980.30 =============== 614-87402 Brkaway Taper ITS Pole Steel (40 Ft) Each =================================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 4.00 11632.95 11632.95 11632.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 11632.95 11632.95 11632.95 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 11632.95 11632.95 11632.95 =============== 614-87412 Fiber Optic Cable (S Mode) (12 S) (Inst) Lin Foot =============================================== NH0242-071 US 24 & 31ST STREET and US24 05/03/18 70.00 5.00 17.95 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 70.00 5.00 17.95 18.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 70.00 5.00 17.95 18.00 =============== 614-87413 Fiber Optic Cable (M Mode) (12 S) Lin Foot =============================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 3,020.00 4.04 4.04 4.04 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,020.00 4.04 4.04 4.04 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,020.00 4.04 4.04 4.04 =============== 614-87424 Fiber Optic Cable (S Mode) (24 S) Lin Foot =============================================== STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 400.00 21.00 4.53 1.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 400.00 21.00 4.53 1.10 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 503 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-87424 Fiber Optic Cable (S Mode) (24 S) Lin Foot =============================================== STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 300.00 6.00 7.75 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 300.00 6.00 7.75 5.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 700.00 14.57 6.14 2.77 =============== 614-87496 Fiber Optic Cable (S Mode) (96 S) Lin Foot =============================================== NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 365.00 6.00 6.82 2.27 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 365.00 6.00 6.82 2.27 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 365.00 6.00 6.82 2.27 =============== 614-87499 Fiber Optic Cable (S Mode) (Inst) Lin Foot =============================================== ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 93,170.00 1.00 2.55 1.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 93,170.00 1.00 2.55 1.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 93,170.00 1.00 2.55 1.25 =============== 614-87501 Splice FO Cable (1 S) Each =================================================== STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 4.00 800.00 863.33 1525.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 800.00 863.33 1525.00 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 338.00 120.00 113.25 126.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 338.00 120.00 113.25 126.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 342.00 127.95 119.85 142.36 =============== 614-87502 Fiber Optic Cable (S Mode)(168 S) Lin Foot =============================================== C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 66,890.00 5.39 5.39 5.39 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 66,890.00 5.39 5.39 5.39 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 504 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-87502 Fiber Optic Cable (S Mode)(168 S) Lin Foot =============================================== NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 78,170.00 7.00 4.33 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 78,170.00 7.00 4.33 5.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 145,060.00 6.26 4.57 5.18 =============== 614-87512 Splice FO Cable (12 S) Each =================================================== NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 2.00 2500.00 121.00 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 2500.00 121.00 125.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 3.00 2900.00 2256.43 2261.72 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 2900.00 2256.43 2261.72 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 2740.00 1722.57 1407.03 =============== 614-87650 Fiber Optic Cable (S Mode) (216 S) Lin Foot =============================================== NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 4,760.00 4.50 4.42 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,760.00 4.50 4.42 5.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,760.00 4.50 4.42 5.00 =============== 614-87690 Ethernet Switch Each =================================================== NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPL 04/05/18 1.00 10000.00 3450.67 4002.00 STAR400-347 Various intersections across 04/12/18 6.00 4000.00 3649.33 4000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7.00 4857.14 3620.95 4000.29 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 1.00 5500.00 3251.92 2900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 5500.00 3251.92 2900.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 505 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-87690 Ethernet Switch Each =================================================== IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 1.00 6500.00 5968.76 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 6500.00 5968.76 5000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 5111.11 3852.47 3989.11 =============== 614-87691 Ethernet Switch Type I Each =================================================== NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 8.00 4000.00 4500.67 4100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 4000.00 4500.67 4100.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 1.00 4545.75 4545.75 4545.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 4545.75 4545.75 4545.75 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 1.00 3500.00 3566.00 2844.00 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 29.00 3800.00 3958.33 2500.00 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 4.00 5000.00 5011.13 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 34.00 3932.35 4101.09 2804.24 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 43.00 3959.20 4177.11 3085.81 =============== 614-87692 Ethernet Switch Type II Each =================================================== NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 2.00 3500.00 3435.50 3580.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 3500.00 3435.50 3580.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 3.00 3790.00 5694.52 5583.08 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 506 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-87692 Ethernet Switch Type II Each =================================================== NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 11.00 4400.00 4350.00 4000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 14.00 4269.29 4708.54 4339.23 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 2.00 4000.61 4000.61 4000.61 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 4000.61 4000.61 4000.61 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 34.00 3500.00 3384.00 2844.00 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 35.00 3300.00 3330.67 2500.00 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 4.00 5000.00 5322.00 5000.00 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 20.00 5000.00 3648.33 3145.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 5.00 3960.60 3960.60 3960.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 98.00 3819.42 3521.11 2927.54 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 116.00 3871.33 3666.02 3127.67 =============== 614-87697 Ethernet Agg Switch Type I Each =================================================== NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 2.00 12000.00 13797.50 7047.00 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 1.00 10000.00 19561.00 15000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 11333.33 15718.67 9698.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 11333.33 15718.67 9698.00 =============== 614-87698 Ethernet Agg Switch Type II Each =================================================== C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 2.00 22765.91 22765.91 22765.91 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 22765.91 22765.91 22765.91 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 2.00 23000.00 21676.67 25455.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 23000.00 21676.67 25455.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 22882.96 21948.98 24110.46 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 507 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-87702 Ethernet Radio (Pair) Each =================================================== NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 1.00 11500.00 6961.67 6000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 11500.00 6961.67 6000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 11500.00 6961.67 6000.00 =============== 614-87704 Ethernet Radio (Single Client) Each =================================================== STAR400-347 Various intersections across 04/12/18 71.00 2500.00 5954.67 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 71.00 2500.00 5954.67 3000.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 1.00 5500.00 3588.83 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 5500.00 3588.83 3000.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 4.00 4000.00 3591.31 3616.23 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 4000.00 3591.31 3616.23 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 76.00 2618.42 5733.35 3032.43 =============== 614-87708 Cellular Modem (CDMA) Each =================================================== ITSSW01-833 ABOUT 1.5 MILES NORTH OF THE 01/18/18 4.00 3000.00 1431.75 1492.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 3000.00 1431.75 1492.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 3000.00 1431.75 1492.00 =============== 615-00030 Emb Prot Ty 3 Each =================================================== ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 1.00 1500.00 1418.34 1200.00 ER144A-002 SH 144 East and West of Goodr 03/08/18 1.00 500.00 1774.01 920.89 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1000.00 1596.18 1060.45 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 508 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 615-00030 Emb Prot Ty 3 Each =================================================== FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 2.00 2500.00 1629.31 1665.44 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 2500.00 1629.31 1665.44 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 4.00 3000.00 1330.81 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 3000.00 1330.81 3000.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 2.00 3150.00 2185.66 2185.66 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 1.00 2000.00 2293.19 1250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 2766.67 2262.46 1873.77 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 2481.82 1526.40 2097.55 =============== 615-00050 Emb Prot Ty 5 Each =================================================== FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 1.00 2000.00 2406.25 1055.34 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 2000.00 2406.25 1055.34 C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 4.00 1000.00 1096.25 800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 1000.00 1096.25 800.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 1.00 3000.00 4124.92 4500.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 5.00 2250.00 2838.53 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 2375.00 2989.87 3250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 1840.91 2386.66 2159.58 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 509 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 616-30036 36 In Trash Guard Each =================================================== STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 1.00 2000.00 1910.00 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 2000.00 1910.00 500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2000.00 1910.00 500.00 =============== 618-00154 Prestress Conc I (BT54) Lin Foot =============================================== BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 4,104.60 400.00 268.93 220.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,104.60 400.00 268.93 220.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 2,160.00 253.37 253.37 253.37 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,160.00 253.37 253.37 253.37 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,264.60 349.44 268.15 231.51 =============== 618-00163 Prestress Conc I (BT63) Lin Foot =============================================== FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 548.00 210.00 370.59 322.01 FBR0705-087 I-70: EMERGENCY BRIDGE G-25-K 05/16/18 1,820.00 280.00 280.00 280.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,368.00 263.80 348.00 289.72 FBR060A-022 SH 60 over the South Platte 07/12/18 3,125.00 230.00 236.81 235.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 2,588.00 240.00 265.69 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5,713.00 234.53 249.28 241.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,081.00 243.11 259.11 255.84 =============== 618-00173 Prestress Conc I (BT 72) (Install Only) Sq Yard ================================================ NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1,215.00 84.69 84.81 84.81 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,215.00 84.69 84.81 84.81 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,215.00 84.69 84.81 84.81 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 510 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 618-01992 Prestress Conc Box (Depth Less Than 32") Sq Foot ================================================ CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 2,276.00 102.87 100.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,276.00 102.87 100.00 100.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 14,730.00 56.09 56.09 56.09 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 14,730.00 56.09 56.09 56.09 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17,006.00 62.35 61.97 61.97 =============== 618-01994 Prestress Conc Box (Depth 32" Thru 48") Sq Foot ================================================ CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 3,440.00 102.87 80.00 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,440.00 102.87 80.00 80.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,440.00 102.87 80.00 80.00 =============== 618-01995 Prestress Conc Box (32" - 48") Each =================================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 14,728.00 51.02 51.02 51.02 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 14,728.00 51.02 51.02 51.02 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14,728.00 51.02 51.02 51.02 =============== 618-06036 Prestress Conc Slab (Depth Gr Than 13") Sq Foot ================================================ STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 1,770.00 58.00 81.58 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,770.00 58.00 81.58 65.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,770.00 58.00 81.58 65.00 =============== 618-08900 Ground Anchor Lin Foot =============================================== NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 4,640.00 70.00 38.87 42.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,640.00 70.00 38.87 42.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,640.00 70.00 38.87 42.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 511 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 619-00007 Connect To Existing Waterline Each =================================================== ER052A-039 SH 170 11/15/18 2.00 3000.00 4707.48 2040.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 6.00 8954.32 8955.06 8955.06 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8.00 7465.74 6300.32 7226.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 7465.74 6300.32 7226.30 =============== 619-06060 6 In Duct Iron Pipe Lin Foot =============================================== NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 54.00 150.00 175.00 175.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 54.00 150.00 175.00 175.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 27.00 154.58 154.59 154.59 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 27.00 154.58 154.59 154.59 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 81.00 151.53 168.20 168.20 =============== 619-06080 8 In Duct Iron Pipe Lin Foot =============================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 58.00 266.51 266.52 266.52 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 58.00 266.51 266.52 266.52 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 58.00 266.51 266.52 266.52 =============== 619-06100 10 In Duct Iron Pipe Lin Foot =============================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 8.00 586.30 586.34 586.34 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8.00 586.30 586.34 586.34 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 586.30 586.34 586.34 =============== 619-06120 12 In Duct Iron Pipe Lin Foot =============================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 667.00 302.74 302.77 302.77 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 667.00 302.74 302.77 302.77 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 667.00 302.74 302.77 302.77 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 512 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 619-06125 12-In Duct Iron Pipe (Preinsul) Lin Foot =============================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 210.00 416.80 416.84 416.84 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 210.00 416.80 416.84 416.84 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 210.00 416.80 416.84 416.84 =============== 619-06160 16 In Duct Iron Pipe Lin Foot =============================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1,514.00 291.02 291.04 291.04 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,514.00 291.02 291.04 291.04 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,514.00 291.02 291.04 291.04 =============== 619-10127 12 In Weld Steel Pipe (J) Lin Foot =============================================== C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 172.00 150.00 557.58 492.39 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 172.00 150.00 557.58 492.39 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 172.00 150.00 557.58 492.39 =============== 619-10200 20 In Weld Steel Pipe Lin Foot =============================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 110.00 651.53 651.53 651.53 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 110.00 651.53 651.53 651.53 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 110.00 651.53 651.53 651.53 =============== 619-10270 27 In Weld Steel Pipe Lin Foot =============================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 70.00 884.78 884.85 884.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 70.00 884.78 884.85 884.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 70.00 884.78 884.85 884.85 =============== 619-10277 27 In Weld Steel Pipe (J) Lin Foot =============================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 145.00 2398.48 2398.67 2398.67 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 145.00 2398.48 2398.67 2398.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 145.00 2398.48 2398.67 2398.67 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 513 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 619-10300 30 In Weld Steel Pipe Lin Foot =============================================== ER052A-039 SH 170 11/15/18 280.00 450.00 456.19 271.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 280.00 450.00 456.19 271.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 280.00 450.00 456.19 271.00 =============== 619-30060 3/4 In Galv Pipe Lin Foot =============================================== SHE2254-092 SH225 AND 17TH PLACE IMPROVEM 10/18/18 500.00 20.00 42.42 23.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 500.00 20.00 42.42 23.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 500.00 20.00 42.42 23.00 =============== 619-40120 1-1/2 In Copper Pipe Lin Foot =============================================== NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 10.00 40.00 210.00 210.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 40.00 210.00 210.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 40.00 210.00 210.00 =============== 619-50060 3/4 In Plastic Pipe Lin Foot =============================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 2,150.00 6.83 6.96 6.96 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,150.00 6.83 6.96 6.96 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,150.00 6.83 6.96 6.96 =============== 619-50080 1 In Plastic Pipe Lin Foot =============================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 650.00 7.20 7.34 7.34 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 650.00 7.20 7.34 7.34 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 650.00 7.20 7.34 7.34 =============== 619-50100 1-1/4 In Plastic Pipe Lin Foot =============================================== C0703-440 AVALANCHE CONTROL SYSTEM: EJM 02/01/18 100.00 30.00 58.05 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 100.00 30.00 58.05 22.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 100.00 30.00 58.05 22.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 514 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 619-50120 1-1/2 In Plastic Pipe Lin Foot =============================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 190.00 7.41 7.55 7.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 190.00 7.41 7.55 7.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 190.00 7.41 7.55 7.55 =============== 619-50160 2 In Plastic Pipe Lin Foot =============================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 840.00 11.55 11.78 11.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 840.00 11.55 11.78 11.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 840.00 11.55 11.78 11.78 =============== 619-50320 4 In Plastic Pipe Lin Foot =============================================== NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 10.00 30.00 210.00 210.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 30.00 210.00 210.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 250.00 24.15 25.71 25.71 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 250.00 24.15 25.71 25.71 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 260.00 24.38 32.80 32.80 =============== 619-50480 6 In Plastic Pipe Lin Foot =============================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 10.00 215.34 215.34 215.34 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 215.34 215.34 215.34 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 215.34 215.34 215.34 =============== 619-51280 16 In Plastic Pipe Lin Foot =============================================== ER052A-039 SH 170 11/15/18 370.00 150.00 155.49 145.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 370.00 150.00 155.49 145.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 370.00 150.00 155.49 145.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 515 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 619-51290 18 In Plastic Pipe Lin Foot =============================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 190.00 89.55 218.55 218.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 190.00 89.55 218.55 218.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 190.00 89.55 218.55 218.55 =============== 619-71516 2 In Air and Vacuum Valve Each =================================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 2.00 11374.12 11375.06 11375.06 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 11374.12 11375.06 11375.06 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 11374.12 11375.06 11375.06 =============== 619-73000 PRV Vault Each =================================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 189965.79 189981.55 189981.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 189965.79 189981.55 189981.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 189965.79 189981.55 189981.55 =============== 619-75016 2 In Gate Valve Each =================================================== ER052A-039 SH 170 11/15/18 2.00 550.00 810.36 236.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 550.00 810.36 236.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 550.00 810.36 236.00 =============== 619-75064 8 In Gate Valve Each =================================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 2131.99 4264.31 4264.31 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 2131.99 4264.31 4264.31 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2131.99 4264.31 4264.31 =============== 619-75096 12 In Gate Valve Each =================================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 9.00 3730.97 3731.27 3731.27 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9.00 3730.97 3731.27 3731.27 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 3730.97 3731.27 3731.27 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 516 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 619-75116 16 In Gate Valve Each =================================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 13.00 14923.86 18369.35 18369.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 13.00 14923.86 18369.35 18369.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13.00 14923.86 18369.35 18369.35 =============== 619-76128 16 In Btrfly Valve Each =================================================== ER052A-039 SH 170 11/15/18 2.00 4500.00 19902.09 20000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 4500.00 19902.09 20000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 4500.00 19902.09 20000.00 =============== 619-77216 16-In Restrained Coupling Adapter Each =================================================== ER052A-039 SH 170 11/15/18 2.00 1250.00 4990.99 4000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 1250.00 4990.99 4000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1250.00 4990.99 4000.00 =============== 619-77300 Corporation Stop Each =================================================== NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 1.00 1000.00 525.00 525.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 1000.00 525.00 525.00 ER052A-039 SH 170 11/15/18 2.00 700.00 2007.88 2165.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 700.00 2007.88 2165.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 800.00 1873.07 1618.33 =============== 619-77400 Curb Stop and Box Each =================================================== NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 3.00 1000.00 1200.00 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 1000.00 1200.00 1200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 1000.00 1200.00 1200.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 517 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 619-78048 6 In Fire Hydrant Each =================================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 4.00 7653.81 7654.45 7654.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 7653.81 7654.45 7654.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 7653.81 7654.45 7654.45 =============== 619-78049 Inst 6 In Fire Hydrant Each =================================================== NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 2.00 5000.00 10000.00 10000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 5000.00 10000.00 10000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 5000.00 10000.00 10000.00 =============== 619-80000 Cathodic Protection LUMP SUM =============================================== ER052A-039 SH 170 11/15/18 1.00 2000.00 5732.09 4540.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 13324.88 13325.98 13325.98 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 7662.44 6997.74 8932.99 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 7662.44 6997.74 8932.99 =============== 620-00001 Field Office (CL 1) Each =================================================== NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 1.00 5000.00 22047.25 23094.50 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 1.00 15000.00 22541.78 24403.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 10000.00 22343.97 23748.93 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 1.00 15000.00 17000.00 20000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 15000.00 17000.00 20000.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 1.00 23000.00 18260.14 8750.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 518 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 620-00001 Field Office (CL 1) Each =================================================== STA052A-040 SH 52: Antelope Creek 08/23/18 1.00 10000.00 10494.17 4865.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 16500.00 14675.85 6807.50 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 1.00 18000.00 20387.14 21000.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 1.00 12500.00 20138.16 6420.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 1.00 17500.00 24164.97 10000.00 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 1.00 13000.00 24571.43 13500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 15250.00 22246.92 12730.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 14333.33 19939.85 14670.32 =============== 620-00002 Field Office (CL 2) Each =================================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 1.00 10000.00 19823.55 14647.10 STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 1.00 25000.00 14799.63 14000.00 STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 1.00 26000.00 31250.00 18000.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 1.00 24000.00 19351.18 26000.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 1.00 28000.00 23257.50 45000.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 1.00 20000.00 26369.26 20750.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 1.00 25000.00 34750.00 10000.00 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 1.00 25000.00 32607.26 20000.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 1.00 97800.00 46911.61 32749.82 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 1.00 14000.00 18009.05 19136.75 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 1.00 25000.00 26848.90 25000.00 ER144A-002 SH 144 East and West of Goodr 03/08/18 1.00 22000.00 21923.07 14270.00 NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 1.00 25000.00 18656.34 16750.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 1.00 18000.00 18800.88 9000.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 1.00 22000.00 34800.00 34600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15.00 27120.00 25916.97 21326.91 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 1.00 20000.00 22023.20 36956.00 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 1.00 20000.00 25414.80 30986.73 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 1.00 21000.00 19300.00 20000.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 1.00 25000.00 21656.25 16500.00 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 1.00 22000.00 21981.41 35000.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 1.00 22500.00 23666.67 26000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 519 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 620-00002 Field Office (CL 2) Each =================================================== FBR0705-087 I-70: EMERGENCY BRIDGE G-25-K 05/16/18 1.00 20000.00 20000.00 20000.00 ER055A-001 PR SH 55 FLOOD REPAIR 2015 06/28/18 1.00 15000.00 20745.64 9250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 20687.50 22242.83 24336.59 FBR060A-022 SH 60 over the South Platte 07/12/18 1.00 32500.00 33596.56 21750.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 1.00 18500.00 26333.33 19000.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 1.00 20000.00 55038.33 50115.00 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 1.00 28000.00 38800.00 10000.00 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 1.00 30000.00 24280.00 21745.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 1.00 30000.00 35691.36 38000.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 1.00 26000.00 25375.00 26000.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 1.00 20000.00 25811.33 21000.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 1.00 21000.00 32279.74 61700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9.00 25111.11 32396.56 29923.33 BR1131-006 SH 113 AT MP 11.5 10/11/18 1.00 16000.00 24541.53 14000.00 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 1.00 24000.00 15525.00 8050.00 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 1.00 28000.00 19323.65 13132.50 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 1.00 23000.00 39209.23 25627.70 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 1.00 20000.00 24115.89 25000.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 1.00 50000.00 36373.67 42725.00 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 1.00 20000.00 26304.16 26608.32 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 1.00 15000.00 25227.03 19021.20 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 1.00 35000.00 42468.23 26372.93 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 1.00 20000.00 18700.00 25000.00 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 1.00 35000.00 25000.00 25000.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 1.00 40000.00 20330.76 9000.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 1.00 28000.00 15025.03 15075.10 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 1.00 9000.00 37050.06 22500.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 1.00 80000.00 113314.66 110000.00 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 1.00 20000.00 18882.56 11000.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 1.00 40000.00 64376.76 43021.03 STA052A-045 SH 52B NEW RAYMER SOUTH 12/13/18 1.00 20000.00 16304.33 17913.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 3.00 100809.86 100809.86 100809.86 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 21.00 39306.17 35055.71 37213.16 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 53.00 30636.41 29418.20 29535.52 =============== 620-00005 Field Office (Spec) Each =================================================== FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 1.00 25000.00 38018.28 16023.04 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 520 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 620-00005 Field Office (Spec) Each =================================================== ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 1.00 36000.00 121508.75 50000.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 30500.00 82546.53 33011.52 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 1.00 30000.00 47100.00 38900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 30000.00 47100.00 38900.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 1.00 1506057.35 1506057.35 1506057.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1506057.35 1506057.35 1506057.35 NHPP0702-366 I-70 Avon to Vail 11/08/18 1.00 20000.00 34547.19 42000.00 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 1.00 50000.00 63721.67 75000.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 71908.04 72829.70 72829.70 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 796559.65 796559.65 796559.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 234616.92 133193.68 246597.34 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 316940.63 142462.02 324671.22 =============== 620-00011 Field Lab (CL 1) Each =================================================== NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 1.00 21000.00 21200.00 25400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 21000.00 21200.00 25400.00 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 1.00 15000.00 17000.00 20000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 15000.00 17000.00 20000.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 1.00 18000.00 17855.71 22000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 521 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 620-00011 Field Lab (CL 1) Each =================================================== STA086A-051 SH 86; WEST OF I-70 11/29/18 1.00 17500.00 19381.69 12000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 17750.00 18560.01 17000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 17875.00 18687.07 19850.00 =============== 620-00012 Field Lab (CL 2) Each =================================================== STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 1.00 20000.00 13823.22 14000.00 STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 1.00 24000.00 30250.00 16000.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 1.00 18000.00 16600.00 12000.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 1.00 22000.00 18299.54 26000.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 1.00 26000.00 21720.00 40000.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 1.00 20000.00 16841.40 7500.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 1.00 22000.00 21500.00 12000.00 STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 1.00 25000.00 24000.00 24000.00 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 1.00 10000.00 16304.18 7100.00 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 1.00 20000.00 27487.40 7500.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 1.00 20000.00 29970.38 46528.84 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 1.00 20000.00 24179.35 14388.03 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 1.00 20000.00 23066.97 10000.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 1.00 24000.00 47668.75 25000.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 1.00 20000.00 17479.81 9100.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 1.00 18000.00 18606.35 14000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16.00 20562.50 23548.46 17819.80 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 1.00 20000.00 20203.20 20465.00 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 1.00 19000.00 20872.01 11201.72 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 1.00 20000.00 16900.00 20000.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 1.00 25000.00 16621.88 16500.00 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 1.00 26000.00 17914.47 25000.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 1.00 22000.00 19916.67 15000.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 1.00 35000.00 30500.00 40500.00 FBR0705-087 I-70: EMERGENCY BRIDGE G-25-K 05/16/18 1.00 17000.00 17000.00 17000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 23000.00 19938.81 20708.34 FBR060A-022 SH 60 over the South Platte 07/12/18 1.00 32500.00 22941.90 12500.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 522 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 620-00012 Field Lab (CL 2) Each =================================================== NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 1.00 20000.00 22500.00 29000.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 1.00 109345.39 109345.39 109345.39 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 1.00 16000.00 20310.00 8100.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 1.00 26000.00 25086.12 33000.00 STA052A-040 SH 52: Antelope Creek 08/23/18 1.00 8500.00 9110.83 4865.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 1.00 20000.00 24406.25 16000.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 1.00 20000.00 20126.11 23000.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 1.00 20000.00 21244.42 14300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9.00 30260.60 22677.81 27790.04 BR1131-006 SH 113 AT MP 11.5 10/11/18 1.00 16000.00 19898.69 14000.00 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 1.00 22000.00 12725.00 7450.00 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 1.00 26000.00 17747.31 12187.50 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 1.00 18000.00 28167.39 20502.16 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 1.00 20000.00 20959.54 15000.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 1.00 45000.00 29950.67 28675.00 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 1.00 30000.00 70998.33 75000.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 1.00 13000.00 19447.40 19021.20 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 47210.39 54357.12 54357.12 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 1.00 30000.00 33700.06 24800.23 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 1.00 20000.00 20360.00 25000.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 1.00 25000.00 18830.76 8000.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 1.00 24000.00 14861.71 17085.12 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 1.00 36000.00 50888.80 38600.00 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 1.00 20000.00 16172.64 10000.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 1.00 40000.00 31850.41 25812.62 STA052A-045 SH 52B NEW RAYMER SOUTH 12/13/18 1.00 20000.00 12380.67 12142.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 67041.14 67041.14 67041.14 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 18.00 28847.31 26252.51 26370.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 51.00 25580.33 23480.62 23050.35 =============== 620-00015 Field Lab (State Furn) Each =================================================== NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 1.00 7000.00 12050.91 15376.62 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 7000.00 12050.91 15376.62 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 7000.00 12050.91 15376.62 =============== 620-00020 Sanitary Facility Each =================================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 1.00 1000.00 669.01 338.01 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 523 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 620-00020 Sanitary Facility Each =================================================== STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 1.00 3000.00 4255.87 4716.00 STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 1.00 2000.00 6250.00 6000.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 1.00 2000.00 1150.00 2500.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 2.00 2000.00 4285.70 5500.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 2.00 2500.00 4800.00 5000.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 2.00 1500.00 1935.60 2250.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR NHPP0702-373 I-70 GWC Longitudinal Joint R 01/11/18 2.00 2000.00 970.00 1440.00 ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 1.00 5000.00 1516.46 910.00 MTCER100-296 MTCE R1 FY18 WEST SIGN REPLAC 01/11/18 2.00 3000.00 1280.00 1500.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 2.00 2400.00 3812.50 3000.00 MTCE0712-017 SH 71 CHIP SEAL MP 123 TO MP 01/18/18 1.00 1000.00 2500.00 1500.00 ITSSW01-833 ABOUT 1.5 MILES NORTH OF THE 01/18/18 1.00 1500.00 832.25 354.00 STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 1.00 2000.00 4000.00 4000.00 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 2.00 500.00 943.90 190.00 ER1151-033 PR SH 115-MP 34.7 01/25/18 3.00 1000.00 648.16 200.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 1.00 3000.00 2684.60 3000.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 2.00 2700.00 2504.99 2310.40 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 1.00 3000.00 2650.63 1199.00 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 1.00 2200.00 4788.71 6000.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 1.00 3000.00 3132.31 3500.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 1.00 3500.00 7100.00 2500.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 1.00 2000.00 3465.19 1650.00 NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 1.00 2000.00 4805.39 2500.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 1.00 2000.00 1659.35 800.00 NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 1.00 2000.00 460.00 160.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 1.00 3000.00 3825.00 1650.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 1.00 2000.00 1300.00 1300.00 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 1.00 1000.00 1311.83 1498.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 39.00 2112.82 2652.00 2283.50 NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPL 04/05/18 1.00 1500.00 643.33 530.00 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 1.00 1500.00 4810.60 5250.00 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 2.00 1700.00 2190.78 1382.82 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 1.00 3000.00 1200.00 1000.00 STAR400-347 Various intersections across 04/12/18 1.00 1500.00 1507.00 100.00 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 2.00 1500.00 1245.00 1000.00 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 2.00 2000.00 1750.00 1000.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 1.00 5000.00 2085.63 4125.00 STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 1.00 1500.00 1312.50 1215.00 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 2.00 2500.00 3750.04 3500.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 524 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 620-00020 Sanitary Facility Each =================================================== NH0242-071 US 24 & 31ST STREET and US24 05/03/18 1.00 3300.00 2525.00 5900.00 FSA0711-020 SH 71 & SH 94: PUNKIN CENTER 05/03/18 1.00 1500.00 1600.00 500.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 1.00 1500.00 3510.00 3840.00 FBR0705-087 I-70: EMERGENCY BRIDGE G-25-K 05/16/18 2.00 800.00 800.00 800.00 MTCE R100-312 R1 CHIP SEAL 05/17/18 1.00 2500.00 1350.00 1350.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 2.00 2000.00 7000.00 7000.00 MTCER300-244 MTCE R3 FY 18/19 REGIONWIDE S 05/31/18 2.00 750.00 1033.33 1800.00 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 2.00 2800.00 8546.67 10640.00 NHPP0761-230 I-76 AND COUNTY ROAD 22 AT FO 06/14/18 1.00 1500.00 666.67 1100.00 ER055A-001 PR SH 55 FLOOD REPAIR 2015 06/28/18 1.00 2000.00 2344.97 1250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 28.00 1942.86 2500.17 2871.63 NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 1.00 2500.00 1800.00 1800.00 FBR060A-022 SH 60 over the South Platte 07/12/18 1.00 2000.00 3144.29 4000.00 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 5.00 2000.00 1477.58 1188.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 1.00 1000.00 2391.43 1000.00 SHE0701-245 I-70 MEDIAN CABLE RAIL INSTAL 07/12/18 1.00 1800.00 650.00 650.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 1.00 2000.00 1883.33 1100.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 2.00 2000.00 3541.67 2125.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 1.00 3570.00 3570.00 3570.00 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 1.00 2000.00 4233.13 1975.00 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 1.00 3000.00 4487.50 1600.00 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 1.00 1200.00 1558.50 1405.00 C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 1.00 1500.00 1612.50 2000.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 1.00 1500.00 4341.70 3500.00 STA052A-040 SH 52: Antelope Creek 08/23/18 2.00 1500.00 709.67 300.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 2.00 2400.00 5421.87 6000.00 M850-027 US24E MANITOU AVE. AT RUXTON 08/28/18 1.00 4000.00 1294.98 2100.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 2.00 1900.00 1121.45 1000.00 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 1.00 2500.00 1666.25 2000.00 STM0252-469 R2 ADA RAMPS I-25 INT S NEV- 09/06/18 6.00 2580.00 975.00 1000.00 NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 1.00 2000.00 3500.00 3500.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 2.00 1500.00 2368.87 2290.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 1.00 2000.00 4855.75 2000.00 NHPP070A-032 I-70B & Z GRAND JCT PHASE 1 A 09/20/18 1.00 2500.00 1616.00 1500.00 STMR200-246 R2–2018 CRITICAL CULVERTS REP 09/20/18 2.00 1000.00 300.00 300.00 MTCE0704-244 Crack Seal I-70 MP 328 TO MP 09/27/18 1.00 2500.00 2640.00 2640.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 40.00 2091.25 2261.09 1807.75 NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 2.00 2500.00 444.00 200.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 525 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 620-00020 Sanitary Facility Each =================================================== BR1131-006 SH 113 AT MP 11.5 10/11/18 1.00 1750.00 2805.00 2500.00 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 1.00 2500.00 906.00 834.00 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 1.00 2000.00 4000.00 4500.00 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 1.00 2500.00 4387.65 4950.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 2.00 2300.00 6208.51 5125.54 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 1.00 1500.00 2706.71 2200.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 2.00 1500.00 1823.57 435.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 3.00 2500.00 2574.98 420.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 5.00 1750.00 3554.33 4050.00 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 1.00 3000.00 5000.00 4000.00 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 1.00 2500.00 2761.50 1000.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 2.00 1500.00 2262.88 968.00 ER052A-039 SH 170 11/15/18 1.00 1500.00 1387.00 2210.00 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 1.00 3000.00 4500.00 4500.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 2205.00 1764.00 1764.00 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 2.00 2500.00 2411.16 1814.65 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 2.00 1500.00 2820.00 5000.00 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 2.00 2500.00 1250.00 1300.00 C R500-198 R5 GUARDRAIL REPLACEMENT/UPGR 11/29/18 1.00 3500.00 3825.00 3000.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 2.00 2000.00 1573.50 642.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 2.00 1500.00 3766.45 650.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 1.00 1500.00 3498.30 2000.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 1.00 4000.00 3674.18 4522.53 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 1.00 2000.00 3837.20 1750.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 6.00 3500.00 3485.60 4700.00 C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 1.00 1900.00 2015.00 2000.00 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 1.00 3000.00 4206.37 3369.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 2.00 2000.00 5904.91 5377.63 STA052A-045 SH 52B NEW RAYMER SOUTH 12/13/18 1.00 2500.00 6233.33 11000.00 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 1.00 2500.00 3381.67 950.00 STAR100-279 FY20 HMA PREVENTATIVE MAINTEN 12/13/18 1.00 2500.00 5675.00 10000.00 MTCE0253-267 MTCE R4 FY19 I25 CONCRETE PAN 12/13/18 1.00 2000.00 1252.75 1000.00 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 1.00 1200.00 1540.00 2000.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 4.00 5670.00 5670.00 5670.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 59.00 2518.39 3016.53 3143.48 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 166.00 2223.10 2650.76 2573.72 =============== 621-00411 Str Temp Acc Rd (Loc 1) LUMP SUM =============================================== ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 1.00 37500.00 142783.40 10000.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 37500.00 142783.40 10000.00 FBR060A-022 SH 60 over the South Platte 07/12/18 1.00 55000.00 120843.34 35000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 526 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 621-00411 Str Temp Acc Rd (Loc 1) LUMP SUM =============================================== FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 1.00 30000.00 140601.49 75000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 42500.00 130292.89 55000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 40833.33 132523.34 40000.00 =============== 621-00425 Detour LUMP SUM =============================================== FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 1.00 432627.25 631995.72 378798.20 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 1.00 250000.00 297600.00 240000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 341313.63 520530.48 309399.10 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 1.00 50000.00 45570.32 28375.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 1.00 400000.00 955686.34 1000000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 225000.00 580932.68 514187.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 283156.81 552619.15 411793.30 =============== 621-00430 Detour Sq Yard ================================================ NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 700.00 114.74 37.33 37.33 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 700.00 114.74 37.33 37.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 700.00 114.74 37.33 37.33 =============== 621-00450 Detour Pvmt Sq Yard ================================================ NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 377.00 25.00 52.00 35.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 1,186.00 50.00 147.25 115.00 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 850.00 85.00 99.48 95.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 3,125.00 63.00 71.33 61.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 1,613.00 70.00 93.44 78.10 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 2,273.00 70.00 54.07 80.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 1,000.00 45.00 79.67 65.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10,424.00 62.82 80.39 76.15 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 527 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 621-00450 Detour Pvmt Sq Yard ================================================ STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 60.00 55.00 185.20 85.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 78.00 80.00 97.90 61.61 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 138.00 69.13 140.70 71.78 FBR060A-022 SH 60 over the South Platte 07/12/18 700.00 65.00 65.20 50.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 888.00 35.00 50.13 45.40 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 7,665.00 64.64 64.64 64.64 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9,253.00 61.82 62.83 61.69 BR1131-006 SH 113 AT MP 11.5 10/11/18 2,500.00 60.00 144.13 120.83 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 37,577.00 56.00 56.87 44.21 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 199.00 70.00 99.26 130.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 2,365.00 65.00 44.99 39.94 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1,100.00 87.89 74.21 74.21 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 44,210.00 64.16 64.16 64.16 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 87,951.00 60.89 68.43 56.87 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 107,766.00 61.17 70.86 59.17 =============== 621-00451 Detour Pavement Ton ==================================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 564.00 35.18 168.24 168.24 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 564.00 35.18 168.24 168.24 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 564.00 35.18 168.24 168.24 =============== 622-00024 Entry Sign Each =================================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 2.00 35292.50 17240.15 17240.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 35292.50 17240.15 17240.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 35292.50 17240.15 17240.15 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 528 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 622-00270 Bollard Each =================================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 3.00 1500.00 703.38 906.76 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 1500.00 703.38 906.76 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 1500.00 703.38 906.76 =============== 623-00156 Irrig Bubbler Each =================================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 11.00 5.46 5.58 5.58 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 11.00 5.46 5.58 5.58 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 5.46 5.58 5.58 =============== 623-00162 Drip Emit Tubing Lin Foot =============================================== IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 6,030.00 1.50 2.10 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6,030.00 1.50 2.10 2.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,030.00 1.50 2.10 2.00 =============== 623-00164 Drip Emit Each =================================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1,114.00 1.03 1.05 1.05 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 830.00 3.50 4.14 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,944.00 2.08 3.37 1.88 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,944.00 2.08 3.37 1.88 =============== 623-00206 6 In Pop-Up Spray Spr Each =================================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 57.00 25.20 25.71 25.71 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 57.00 25.20 25.71 25.71 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 57.00 25.20 25.71 25.71 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 529 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 623-00336 6 Inch Pop-Up Rotary Spr Each =================================================== IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 400.00 45.00 36.07 36.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 400.00 45.00 36.07 36.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 400.00 45.00 36.07 36.50 =============== 623-00600 1-1/2 In Plastic Pipe Lin Foot =============================================== IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 5,960.00 3.00 3.60 2.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5,960.00 3.00 3.60 2.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,960.00 3.00 3.60 2.60 =============== 623-00601 1 In Plastic Pipe Lin Foot =============================================== IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 2,690.00 2.00 3.34 2.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,690.00 2.00 3.34 2.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,690.00 2.00 3.34 2.20 =============== 623-00602 2 In Plastic Pipe (Irrig/Sleve) Lin Foot =============================================== IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 8,370.00 3.00 4.18 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8,370.00 3.00 4.18 4.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,370.00 3.00 4.18 4.00 =============== 623-01716 2 In Backflow Preventer Each =================================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 3097.50 3160.71 3160.71 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 3097.50 3160.71 3160.71 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 3097.50 3160.71 3160.71 =============== 623-03106 3/4 In Auto Ctrl Valve Each =================================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 5.00 288.75 294.64 294.64 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 288.75 294.64 294.64 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 288.75 294.64 294.64 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 530 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 623-03108 1 In Auto Ctrl Valve Each =================================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 283.50 289.29 289.29 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 283.50 289.29 289.29 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 283.50 289.29 289.29 =============== 623-03112 1-1/2 In Auto Ctrl Val Each =================================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 3.00 304.50 310.72 310.72 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 304.50 310.72 310.72 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 304.50 310.72 310.72 =============== 623-03116 2 In Auto Ctrl Valve Each =================================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 341.25 348.21 348.21 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 13.00 500.00 403.67 735.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 14.00 488.66 402.63 707.37 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 488.66 402.63 707.37 =============== 623-04000 Ctrl Wire 24 Volt Lin Foot =============================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 3,400.00 0.27 0.27 0.27 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 13,960.00 1.00 15.24 0.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 17,360.00 0.86 14.38 0.29 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17,360.00 0.86 14.38 0.29 =============== 623-04006 3/4 In Quick-Coupler Each =================================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 241.50 246.42 246.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 241.50 246.42 246.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 241.50 246.42 246.42 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 531 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 623-07012 1-1/2 In Water Meter Each =================================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 12075.00 20351.23 20351.23 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 12075.00 20351.23 20351.23 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 12075.00 20351.23 20351.23 =============== 623-08110 10 Station Auto Ctrler Each =================================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 1023.75 1044.65 1044.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1023.75 1044.65 1044.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1023.75 1044.65 1044.65 =============== 623-09900 Sprinkler System LUMP SUM =============================================== FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 1.00 11000.00 27938.21 14000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 11000.00 27938.21 14000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 11000.00 27938.21 14000.00 =============== 624-20014 12 In Drain Pipe End Sect Each =================================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 533.00 533.09 533.09 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 533.00 533.09 533.09 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 533.00 533.09 533.09 =============== 624-20025 24 In Drainage Pipe (CL 0) (CIP) Lin Foot =============================================== FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 67.00 80.00 87.43 53.73 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 67.00 80.00 87.43 53.73 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 109.00 90.00 107.14 120.63 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 109.00 90.00 107.14 120.63 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 176.00 86.19 98.58 95.16 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 532 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 624-20030 30 In Drainage Pipe (CL 0) Lin Foot =============================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 200.00 133.25 133.28 133.28 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 200.00 133.25 133.28 133.28 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 200.00 133.25 133.28 133.28 =============== 624-20060 60 In Drainage Pipe (CL 0) Lin Foot =============================================== FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 300.00 150.00 123.00 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 300.00 150.00 123.00 120.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 300.00 150.00 123.00 120.00 =============== 624-20300 Detour Drainage Pipe (CL 0) Lin Foot =============================================== FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 300.00 45.00 62.04 50.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 485.00 45.00 41.40 45.10 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 837.00 45.00 24.64 40.00 ER144A-002 SH 144 East and West of Goodr 03/08/18 101.00 80.00 80.38 60.71 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,723.00 47.05 41.42 44.39 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 4,675.00 141.25 141.25 141.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,675.00 141.25 141.25 141.25 BR1131-006 SH 113 AT MP 11.5 10/11/18 160.00 85.00 126.57 125.69 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 3,100.00 50.00 49.70 76.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1,500.00 142.23 142.23 142.23 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,760.00 80.24 70.81 98.54 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,158.00 100.68 72.02 108.07 =============== 624-20301 Detour Drainage Pipe (CL 0) LUMP SUM =============================================== STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 1.00 5000.00 9857.86 3125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 5000.00 9857.86 3125.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5000.00 9857.86 3125.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 533 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 624-27037 36 In Drainage Pipe (CL 7) (CIP) Lin Foot =============================================== ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 250.00 125.00 127.15 99.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 250.00 125.00 127.15 99.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 250.00 125.00 127.15 99.00 =============== 624-27049 48 In Drainage Pipe (CL 7) (CIP) Lin Foot =============================================== ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 172.00 200.00 175.01 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 172.00 200.00 175.01 150.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 172.00 200.00 175.01 150.00 =============== 624-29019 18 In Drainage Pipe (CL 9) (CIP) Lin Foot =============================================== STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 571.00 125.00 77.50 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 571.00 125.00 77.50 75.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 571.00 125.00 77.50 75.00 =============== 624-29024 24 In Drainage Pipe (CL 9) Lin Foot =============================================== NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 108.00 80.00 223.05 66.09 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 108.00 80.00 223.05 66.09 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 108.00 80.00 223.05 66.09 =============== 624-29025 24 In Drainage Pipe (CL 9) (CIP) Lin Foot =============================================== FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 169.00 145.00 169.76 160.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 169.00 145.00 169.76 160.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 169.00 145.00 169.76 160.00 =============== 624-29031 30 In Drainage Pipe (CL 9) (CIP) Lin Foot =============================================== FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 173.00 175.00 182.73 160.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 173.00 175.00 182.73 160.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 173.00 175.00 182.73 160.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 534 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 624-29037 36 In Drainage Pipe (CL 9) (CIP) Lin Foot =============================================== FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 415.00 190.00 215.11 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 415.00 190.00 215.11 200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 415.00 190.00 215.11 200.00 =============== 624-30037 36 In Drainage Pipe (CL 10) (CIP) Lin Foot =============================================== BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 290.00 125.00 129.73 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 290.00 125.00 129.73 150.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 290.00 125.00 129.73 150.00 =============== 624-49025 24 In Equiv Drain Pipe E (CL 9) (CIP) Lin Foot =============================================== FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 24.00 175.00 281.77 345.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 24.00 175.00 281.77 345.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 24.00 175.00 281.77 345.00 =============== 625-00000 Const Surveying LUMP SUM =============================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 1.00 15000.00 17993.89 17987.77 STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 1.00 25000.00 22668.07 20000.00 STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 1.00 15000.00 29250.00 26000.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 1.00 15000.00 24900.00 15000.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 1.00 20000.00 18105.00 20000.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 1.00 60000.00 64337.60 42500.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 1.00 50000.00 25766.62 25000.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 1.00 65000.00 64503.84 45000.00 CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 1.00 163648.04 100000.00 100000.00 ER1151-033 PR SH 115-MP 34.7 01/25/18 1.00 2333.33 3324.70 2200.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 1.00 35000.00 23030.48 8714.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 1.00 175000.00 224455.54 200000.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 1.00 40000.00 29135.62 21783.07 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 535 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 625-00000 Const Surveying LUMP SUM =============================================== STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 1.00 9000.00 8066.67 5750.00 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 1.00 5000.00 18075.80 20000.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 1.00 45000.00 28037.92 15000.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 1.00 150000.00 265062.25 210000.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 1.00 80000.00 76767.09 25351.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 1.00 20000.00 31598.92 15000.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 1.00 10000.00 23600.00 31200.00 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 1.00 488763.49 247700.00 247700.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 1.00 25000.00 38257.85 32600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 22.00 63267.15 63751.42 47966.08 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 1.00 500.00 15228.00 8500.00 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 1.00 30000.00 29247.36 25529.05 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 1.00 30000.00 58307.33 40000.00 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 1.00 40000.00 26037.78 20000.00 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 1.00 40000.00 28000.00 16000.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 1.00 20000.00 25354.00 11660.00 STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 1.00 3500.00 4145.75 3200.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 1.00 30000.00 32266.71 16000.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 1.00 40000.00 66958.90 27800.00 FBR0705-087 I-70: EMERGENCY BRIDGE G-25-K 05/16/18 1.00 65000.00 65000.00 65000.00 MTCE R100-312 R1 CHIP SEAL 05/17/18 1.00 57996.32 2500.00 2500.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 1.00 50000.00 25000.00 25000.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 1.00 8500.00 5875.00 8125.00 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 1.00 56000.00 32000.00 26000.00 ER055A-001 PR SH 55 FLOOD REPAIR 2015 06/28/18 1.00 15000.00 24011.47 9100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 15.00 32433.09 28072.04 20294.27 FBR060A-022 SH 60 over the South Platte 07/12/18 1.00 120000.00 79234.28 70000.00 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 1.00 15000.00 41634.83 17900.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 1.00 8000.00 14656.00 12100.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 1.00 17000.00 36913.71 38000.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 1.00 30000.00 48583.33 23750.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 1.00 461475.00 461475.00 461475.00 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 1.00 10000.00 9791.44 6100.00 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 1.00 25000.00 34477.50 7500.00 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 1.00 25000.00 9806.50 8305.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 1.00 180000.00 72656.53 85000.00 STA052A-040 SH 52: Antelope Creek 08/23/18 1.00 7500.00 8838.33 11000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 536 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 625-00000 Const Surveying LUMP SUM =============================================== STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 1.00 15000.00 61450.00 40000.00 M850-027 US24E MANITOU AVE. AT RUXTON 08/28/18 1.00 15000.00 9856.47 4600.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 1.00 15000.00 42758.57 47000.00 STM0252-469 R2 ADA RAMPS I-25 INT S NEV- 09/06/18 1.00 31000.00 33975.00 45000.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 1.00 30000.00 56184.98 30000.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 1.00 7500.00 4281.25 5000.00 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 1.00 10000.00 7313.25 3450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 18.00 56804.17 45854.18 50898.89 NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 1.00 10000.00 10050.00 9500.00 BR1131-006 SH 113 AT MP 11.5 10/11/18 1.00 16000.00 22519.92 9427.78 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 1.00 40000.00 109326.11 90978.33 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 1.00 30000.00 51962.91 80000.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 1.00 15000.00 43580.00 30500.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 1.00 30000.00 31114.35 34000.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 1.00 255000.00 209438.00 75000.00 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 1.00 80000.00 25336.00 30672.00 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 1.00 80000.00 37000.00 5000.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 1.00 25000.00 50854.17 44500.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 1.00 14000.00 28089.06 26402.50 ER052A-039 SH 170 11/15/18 1.00 10000.00 11152.74 5830.00 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 1.00 25000.00 40000.00 40000.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 234412.50 243547.50 243547.50 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 1.00 75000.00 75768.71 56913.49 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 1.00 10000.00 31400.00 26000.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 1.00 12500.00 13506.40 12600.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 1.00 25000.00 44921.75 35850.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 1.00 50000.00 45376.24 51700.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 1.00 21000.00 270000.00 100000.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 1.00 100000.00 114322.21 21736.94 STA052A-045 SH 52B NEW RAYMER SOUTH 12/13/18 1.00 20000.00 41000.00 49000.00 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 1.00 3000.00 16850.00 22650.00 STAR100-279 FY20 HMA PREVENTATIVE MAINTEN 12/13/18 1.00 7000.00 26250.00 50000.00 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 1.00 25000.00 18728.57 25000.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 1219245.30 1219245.30 1219245.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 26.00 93544.53 64009.85 92155.92 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 81.00 65777.60 53089.14 57443.78 =============== 625-00001 Const Surveying (Hour) Hour =================================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 10.00 200.00 220.42 140.84 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 537 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 625-00001 Const Surveying (Hour) Hour =================================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 30.00 150.00 235.00 210.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 20.00 150.00 148.50 129.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 60.00 158.33 189.93 171.47 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 40.00 200.00 219.13 176.00 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 40.00 150.00 178.25 150.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 40.00 175.00 189.74 273.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 120.00 175.00 201.56 199.98 FBR060A-022 SH 60 over the South Platte 07/12/18 20.00 300.00 170.19 155.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 300.00 173.25 173.25 173.25 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 32.00 200.00 215.50 205.00 C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 50.00 225.00 165.25 164.00 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 25.00 200.00 292.50 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 427.00 188.82 186.85 181.11 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 50.00 150.00 152.50 125.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 10.00 275.00 180.63 177.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 50.00 157.50 183.75 183.75 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 100.00 125.00 211.89 203.00 C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 50.00 175.00 190.00 165.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 300.00 173.25 173.25 173.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 560.00 163.13 189.08 174.52 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,167.00 173.50 191.20 179.39 =============== 625-00015 Settlement Instrument LUMP SUM =============================================== C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 1.00 103515.05 103515.05 103515.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 103515.05 103515.05 103515.05 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 71862.40 71862.40 71862.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 71862.40 71862.40 71862.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 87688.73 87688.73 87688.73 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 538 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 625-00100 Ground Penetrating Radar Survey Sq Foot ================================================ BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 39,913.00 1.00 0.60 0.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 39,913.00 1.00 0.60 0.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 39,913.00 1.00 0.60 0.45 =============== 626-00000 Mobilization LUMP SUM =============================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 1.00 5000.00 44448.00 58895.99 STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 1.00 558484.00 234000.00 85000.00 STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 1.00 240000.00 413000.00 326000.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 1.00 31646.95 119666.67 64000.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 1.00 750000.00 709419.53 790000.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 1.00 600000.00 601250.00 875000.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 1.00 375000.00 490568.92 470000.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR NHPP0702-373 I-70 GWC Longitudinal Joint R 01/11/18 1.00 65000.00 120125.00 110250.00 ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 1.00 85941.75 158527.38 133000.00 MTCER100-296 MTCE R1 FY18 WEST SIGN REPLAC 01/11/18 1.00 10000.00 36375.00 45000.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 1.00 420000.00 460045.50 387000.00 MTCE0712-017 SH 71 CHIP SEAL MP 123 TO MP 01/18/18 1.00 90000.00 116287.51 62425.00 ITSSW01-833 ABOUT 1.5 MILES NORTH OF THE 01/18/18 1.00 32000.00 18927.50 18990.00 STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 1.00 330000.00 355500.00 355500.00 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 1.00 21043.25 83056.11 58000.00 NHPP5502-088 US 550 RIVERSIDE SNOW SHED LI 01/25/18 1.00 40000.00 99980.73 61169.00 ER1151-033 PR SH 115-MP 34.7 01/25/18 1.00 8979.00 16956.32 15000.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 1.00 320000.00 321412.29 229500.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 1.00 335982.10 954857.14 1060000.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 1.00 235000.00 326850.38 237588.00 C0703-440 AVALANCHE CONTROL SYSTEM: EJM 02/01/18 1.00 90000.00 91717.51 61900.00 STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 1.00 60616.10 69466.67 28400.00 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 1.00 400000.00 624787.50 515000.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 1.00 305000.00 281002.57 265000.00 NHPP5502-096 US550 STRIPING & RUMBLE STRIP 03/01/18 1.00 110000.00 125750.00 90000.00 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 1.00 43500.00 91375.00 35000.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 1.00 1100000.00 1319405.04 884500.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 1.00 575000.00 432831.66 357591.55 NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 1.00 400000.00 399585.04 261340.17 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 1.00 140000.00 227800.25 90000.00 MTCER500-202 R5 FY18 STRIPING 03/08/18 1.00 10000.00 22200.00 25000.00 MTCER500-201 R5 FY18 SIGN REPLACEMENT 03/08/18 1.00 40000.00 38585.71 35000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 539 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 626-00000 Mobilization LUMP SUM =============================================== FSAR200-247 US 287 FROM MP 0.00 (STATE LI 03/08/18 1.00 46157.60 106475.00 112950.00 MTCER500-203 WITHIN CDOT'S R5 MAINTENANCE 03/08/18 1.00 50000.00 109000.00 160000.00 NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 1.00 30943.00 59908.33 21975.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 1.00 150000.00 184458.54 128917.08 MTCER300-245 MTCE R3 FY 18/19 REGIONWIDE E 03/29/18 1.00 20000.00 15500.00 5000.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 1.00 260000.00 205000.00 110000.00 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 1.00 75000.00 168090.05 140270.16 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 39.00 206786.63 293632.70 214638.10 NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPL 04/05/18 1.00 2000.00 19519.00 20602.00 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 1.00 113229.00 223529.15 174225.75 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 1.00 133154.00 281305.26 242620.34 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 1.00 300000.00 251666.67 290000.00 STAR400-347 Various intersections across 04/12/18 1.00 40000.00 181239.89 161122.96 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 1.00 93662.60 185677.40 195000.00 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 1.00 202287.97 230000.00 220000.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 1.00 175000.00 165868.13 50000.00 STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 1.00 30000.00 34216.25 15000.00 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 1.00 590000.00 388000.00 348000.00 MTCE0701-246 MTCE R3 FY18 I-70 CENTERLINE 05/03/18 1.00 20000.00 15562.50 16750.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 1.00 147631.51 190564.82 60000.00 FSA0711-020 SH 71 & SH 94: PUNKIN CENTER 05/03/18 1.00 33000.00 60000.00 51000.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 1.00 300000.00 467637.58 222700.00 FBR0705-087 I-70: EMERGENCY BRIDGE G-25-K 05/16/18 1.00 297735.00 297735.00 297735.00 MTCE R100-312 R1 CHIP SEAL 05/17/18 1.00 90000.00 45000.00 45000.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 1.00 500000.00 355000.00 355000.00 MTCER300-244 MTCE R3 FY 18/19 REGIONWIDE S 05/31/18 1.00 50000.00 46068.67 30000.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 1.00 21500.00 34677.28 24050.00 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 1.00 480000.00 871834.67 752000.00 NHPP0761-230 I-76 AND COUNTY ROAD 22 AT FO 06/14/18 1.00 15000.00 31571.67 13000.00 MPR200-251 R2 FY19 PAVEMENT MARKING 06/21/18 1.00 58199.10 10625.00 15000.00 NHPP0703-436 EJMT PLENUM WATERPROOFING MEM 06/28/18 1.00 270000.00 165465.00 212000.00 ER055A-001 PR SH 55 FLOOD REPAIR 2015 06/28/18 1.00 160000.00 178573.24 220000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 24.00 171766.63 192232.36 167950.25 MTCE R100-313 R1 FY19/20 REGIONWIDE PAVEMEN 07/05/18 1.00 120000.00 16250.00 22500.00 NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 1.00 40000.00 52000.00 52000.00 FBR060A-022 SH 60 over the South Platte 07/12/18 1.00 550000.00 432278.63 630000.00 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 1.00 200000.00 306839.01 239504.08 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 1.00 100000.00 166103.91 82627.38 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 540 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 626-00000 Mobilization LUMP SUM =============================================== SHE0701-245 I-70 MEDIAN CABLE RAIL INSTAL 07/12/18 1.00 50000.00 105845.00 105845.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 1.00 180000.00 152750.00 95000.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 1.00 275000.00 492480.00 447440.00 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 1.00 200000.00 266770.89 126000.00 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 1.00 140000.00 280000.00 219000.00 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 1.00 65000.00 59158.00 80041.00 C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 1.00 40000.00 57500.00 50000.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 1.00 431888.00 595644.14 430000.00 STA052A-040 SH 52: Antelope Creek 08/23/18 1.00 35000.00 54458.33 32000.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 1.00 454597.20 579650.97 463593.00 M850-027 US24E MANITOU AVE. AT RUXTON 08/28/18 1.00 110000.00 222750.00 16000.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 1.00 183516.79 291826.80 270000.00 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 1.00 110000.00 131250.00 50000.00 STM0252-469 R2 ADA RAMPS I-25 INT S NEV- 09/06/18 1.00 75118.00 145667.50 30000.00 NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 1.00 60000.00 45000.00 45000.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 1.00 478489.51 584338.33 440000.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 1.00 60000.00 45858.25 38900.00 NHPP070A-032 I-70B & Z GRAND JCT PHASE 1 A 09/20/18 1.00 78000.00 71128.00 83926.00 STMR200-246 R2–2018 CRITICAL CULVERTS REP 09/20/18 1.00 33058.50 24000.00 24000.00 MTCE0704-244 Crack Seal I-70 MP 328 TO MP 09/27/18 1.00 55000.00 43000.00 43000.00 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 1.00 47757.00 70160.00 36950.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 26.00 160477.88 290529.35 159743.33 NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 1.00 35800.00 112300.00 45000.00 BR1131-006 SH 113 AT MP 11.5 10/11/18 1.00 122500.00 189809.07 86235.82 MTCER400-365 REGION 4 FY 19 EPOXY 1 10/18/18 1.00 10000.00 14000.00 5000.00 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 1.00 135000.00 66266.68 115000.70 FSA076A-011 I-76 FROM MM 25 TO MM 100 10/18/18 1.00 10000.00 23000.00 10000.00 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 1.00 325000.00 193000.00 142000.00 SHER200-243 R2 WRONG WAY PREVENTION 10/18/18 1.00 169676.45 266867.50 133735.00 SHE2254-092 SH225 AND 17TH PLACE IMPROVEM 10/18/18 1.00 15000.00 15500.00 9000.00 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 1.00 256000.00 289140.51 155000.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 1.00 753383.50 851666.67 845000.00 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 1.00 200000.00 260530.41 230000.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 1.00 135000.00 277657.14 175000.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 1.00 900000.00 1077334.78 1245000.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 1.00 2500000.00 2184413.61 1731240.84 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 1.00 750000.00 814166.24 657805.38 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 1.00 670000.00 608333.33 470000.00 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 1.00 67556.00 188812.00 25000.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 1.00 200000.00 406092.50 225000.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 1.00 135000.00 140528.46 57817.43 ER052A-039 SH 170 11/15/18 1.00 80000.00 104150.00 147800.00 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 1.00 50000.00 94000.00 94000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 541 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 626-00000 Mobilization LUMP SUM =============================================== STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 1.00 250000.00 462666.84 342937.35 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 1.00 113950.70 213440.00 75000.00 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 1.00 100000.00 187250.00 212000.00 C R500-198 R5 GUARDRAIL REPLACEMENT/UPGR 11/29/18 1.00 110000.00 132500.00 125000.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 1.00 120000.00 93969.09 66000.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 1.00 300000.00 442560.80 335000.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 1.00 340655.00 540088.27 565850.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 1.00 360000.00 255962.97 108811.60 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 1.00 225000.00 170103.36 130000.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 1.00 1500000.00 2755396.57 2037690.55 C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 1.00 50000.00 52760.00 40000.00 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 1.00 275000.00 316334.62 94000.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 1.00 1150000.00 1554574.06 950296.25 STA052A-045 SH 52B NEW RAYMER SOUTH 12/13/18 1.00 325000.00 268241.31 294723.92 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 1.00 200000.00 127166.67 141500.00 STAR100-279 FY20 HMA PREVENTATIVE MAINTEN 12/13/18 1.00 90000.00 238250.00 280000.00 MTCE0253-267 MTCE R4 FY19 I25 CONCRETE PAN 12/13/18 1.00 60000.00 104931.00 65000.00 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 1.00 150293.25 168124.93 142000.00 MPR200-252 REGION 2 - PUEBLO COUNTY HIGH 12/20/18 1.00 23037.50 88333.33 30000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 40.00 331571.31 384825.82 316011.12 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 129.00 229281.90 301614.85 226143.05 =============== 626-00100 Mobilization (w/o Autopay) LUMP SUM =============================================== CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 1.00 818804.28 327320.00 327320.00 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 1.00 421087.87 414843.00 414843.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 619946.08 371081.50 371081.50 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 1.00 10116857.72 10116857.72 10116857.72 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 10116857.72 10116857.72 10116857.72 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 2231004.28 2407193.15 2407193.15 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 13124414.99 13124414.99 13124414.99 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 7677709.64 7765804.07 7765804.07 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 5342433.83 5278125.77 5278125.77 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 542 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 626-01101 Public Info Services (Tier I) LUMP SUM =============================================== STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 1.00 30000.00 13434.00 8100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 30000.00 13434.00 8100.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 1.00 562753.80 562753.80 562753.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 562753.80 562753.80 562753.80 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 521189.55 521189.55 521189.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 521189.55 521189.55 521189.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 371314.45 164444.76 364014.45 =============== 626-01102 Public Info Services (Tier II) LUMP SUM =============================================== FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 1.00 31000.00 27270.75 30000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 31000.00 27270.75 30000.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 108513.83 108513.56 108513.56 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 1.00 55000.00 61875.00 58000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 81756.92 71202.71 83256.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 64837.94 40999.49 65504.52 =============== 626-01103 Public Info Services (Tier III) LUMP SUM =============================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 1.00 15000.00 17750.00 16000.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 1.00 25000.00 7102.65 7000.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 1.00 15000.00 16088.00 30000.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 1.00 8000.00 12432.00 10000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 543 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 626-01103 Public Info Services (Tier III) LUMP SUM =============================================== STA0342-060 US 34D OVERLAY AND BRIDGE WOR NHPP0702-373 I-70 GWC Longitudinal Joint R 01/11/18 1.00 5000.00 10250.00 16000.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 1.00 18000.00 12000.00 12000.00 STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 1.00 5000.00 6000.00 6000.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 1.00 10000.00 8110.89 5445.76 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 1.00 6000.00 6492.67 7800.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 1.00 10000.00 12207.83 9000.00 NHPP5502-096 US550 STRIPING & RUMBLE STRIP 03/01/18 1.00 7000.00 4840.00 3160.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 1.00 20000.00 29290.70 20000.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 1.00 8500.00 13900.53 13000.00 NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 1.00 7000.00 3662.53 3000.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 1.00 75000.00 6908.50 7400.00 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 1.00 2500.00 7229.33 6032.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16.00 14812.50 12341.37 10739.86 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 1.00 10000.00 8092.89 6000.00 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 1.00 45336.03 15500.00 11000.00 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 1.00 15000.00 10562.60 15000.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 1.00 5000.00 10983.33 9300.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 1.00 10000.00 13425.00 13700.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 1.00 25000.00 12000.00 12000.00 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 1.00 14000.00 16568.33 10000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7.00 17762.29 11800.79 11000.00 SHE0701-245 I-70 MEDIAN CABLE RAIL INSTAL 07/12/18 1.00 5000.00 6365.00 6365.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 1.00 30000.00 22245.00 11735.00 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 1.00 2500.00 8250.00 6000.00 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 1.00 8000.00 11832.00 8414.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 1.00 10000.00 21095.59 33000.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 1.00 15000.00 13843.75 15000.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 1.00 13750.00 8532.59 10000.00 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 1.00 25000.00 9775.00 8000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 13656.25 14497.67 12314.25 NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 1.00 5000.00 4310.00 5000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 544 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 626-01103 Public Info Services (Tier III) LUMP SUM =============================================== NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 1.00 15000.00 7500.00 5000.00 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 1.00 8000.00 13121.41 16000.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 1.00 20000.00 12457.32 8870.00 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 1.00 8000.00 5300.00 3600.00 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 1.00 30000.00 40065.00 40000.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 1.00 15000.00 20000.00 15000.00 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 1.00 7000.00 17000.00 17000.00 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 1.00 20000.00 17324.96 18799.85 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 1.00 25000.00 6425.00 5850.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 1.00 5000.00 12128.52 5600.00 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 1.00 17000.00 19663.00 10625.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 1.00 15000.00 24004.52 14429.73 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 1.00 25000.00 14057.14 10000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 14.00 15357.14 16279.38 12555.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 45.00 15235.25 13793.52 11625.03 =============== 626-01104 Public Info Services (Tier IV) LUMP SUM =============================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 1.00 4000.00 5326.69 2653.38 STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 1.00 15000.00 6586.86 8000.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 1.00 8000.00 3233.33 1500.00 MTCER100-296 MTCE R1 FY18 WEST SIGN REPLAC 01/11/18 1.00 10000.00 6727.00 3700.00 MTCE0712-017 SH 71 CHIP SEAL MP 123 TO MP 01/18/18 1.00 4500.00 3061.67 3685.00 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 1.00 1300.00 5167.45 1800.00 NHPP5502-088 US 550 RIVERSIDE SNOW SHED LI 01/25/18 1.00 3500.00 5656.10 3263.00 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 1.00 10000.00 14534.56 11272.00 C0703-440 AVALANCHE CONTROL SYSTEM: EJM 02/01/18 1.00 5000.00 8299.31 4400.00 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 1.00 5000.00 2737.50 1750.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 1.00 10000.00 7104.56 7000.00 MTCER500-202 R5 FY18 STRIPING 03/08/18 1.00 4000.00 5300.00 5000.00 MTCER500-201 R5 FY18 SIGN REPLACEMENT 03/08/18 1.00 3000.00 4645.29 3500.00 FSAR200-247 US 287 FROM MP 0.00 (STATE LI 03/08/18 1.00 6000.00 6500.00 5500.00 MTCER500-203 WITHIN CDOT'S R5 MAINTENANCE 03/08/18 1.00 5500.00 11517.50 21000.00 NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 1.00 7000.00 3566.67 1000.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 1.00 15000.00 2988.00 1976.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 17.00 6870.59 6195.12 5117.61 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 1.00 10000.00 9934.26 7445.98 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 1.00 15000.00 5666.67 5000.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 1.00 7500.00 6828.88 5500.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 545 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 626-01104 Public Info Services (Tier IV) LUMP SUM =============================================== STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 1.00 5000.00 2357.50 2125.00 FSA0711-020 SH 71 & SH 94: PUNKIN CENTER 05/03/18 1.00 3500.00 2066.67 2600.00 MTCE R100-312 R1 CHIP SEAL 05/17/18 1.00 15312.20 6500.00 6500.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 1.00 3500.00 4125.39 5727.50 MPR200-251 R2 FY19 PAVEMENT MARKING 06/21/18 1.00 5000.00 8750.00 2500.00 ER055A-001 PR SH 55 FLOOD REPAIR 2015 06/28/18 1.00 5000.00 6205.10 4000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 9.00 7756.91 6568.85 4599.83 NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 1.00 10000.00 8800.00 8800.00 FBR060A-022 SH 60 over the South Platte 07/12/18 1.00 20000.00 8084.35 6500.00 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 1.00 4000.00 9743.83 9261.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 1.00 3000.00 5115.71 4200.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 1.00 8000.00 6494.50 4300.00 C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 1.00 6750.00 4897.50 4590.00 STA052A-040 SH 52: Antelope Creek 08/23/18 1.00 4000.00 4647.17 4100.00 STM0252-469 R2 ADA RAMPS I-25 INT S NEV- 09/06/18 1.00 11000.00 3350.00 1200.00 NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 1.00 10000.00 6563.00 6563.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 1.00 7000.00 3729.00 5000.00 NHPP070A-032 I-70B & Z GRAND JCT PHASE 1 A 09/20/18 1.00 10000.00 19281.00 15000.00 STMR200-246 R2–2018 CRITICAL CULVERTS REP 09/20/18 1.00 3000.00 1700.00 1700.00 MTCE0704-244 Crack Seal I-70 MP 328 TO MP 09/27/18 1.00 7000.00 6323.00 6323.00 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 1.00 5000.00 7507.00 13800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 14.00 7767.86 6865.21 6524.07 BR1131-006 SH 113 AT MP 11.5 10/11/18 1.00 8000.00 6860.73 6750.33 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 1.00 15000.00 8582.75 9786.00 SHER200-243 R2 WRONG WAY PREVENTION 10/18/18 1.00 2500.00 14900.00 4800.00 SHE2254-092 SH225 AND 17TH PLACE IMPROVEM 10/18/18 1.00 4117.61 4196.67 4190.00 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 1.00 8000.00 8354.45 6415.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 1.00 6000.00 8027.14 6900.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 1.00 28000.00 15530.08 23252.25 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 1.00 5000.00 6429.88 6018.00 ER052A-039 SH 170 11/15/18 1.00 5000.00 6066.00 5830.00 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 1.00 5000.00 9911.60 20000.00 C R500-198 R5 GUARDRAIL REPLACEMENT/UPGR 11/29/18 1.00 15000.00 4425.00 4500.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 1.00 8000.00 5434.92 4815.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 1.00 8000.00 5810.01 2500.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 1.00 8000.00 5315.01 6030.04 C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 1.00 5000.00 6589.00 4370.00 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 1.00 3000.00 5657.04 5000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 546 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 626-01104 Public Info Services (Tier IV) LUMP SUM =============================================== STA052A-045 SH 52B NEW RAYMER SOUTH 12/13/18 1.00 6000.00 4316.67 2500.00 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 1.00 5000.00 8691.00 7548.00 STAR100-279 FY20 HMA PREVENTATIVE MAINTEN 12/13/18 1.00 9000.00 8250.00 10000.00 MTCE0253-267 MTCE R4 FY19 I25 CONCRETE PAN 12/13/18 1.00 7000.00 3784.25 3500.00 MPR200-252 REGION 2 - PUEBLO COUNTY HIGH 12/20/18 1.00 2500.00 10000.00 10000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 21.00 7767.51 7186.18 7366.89 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 61.00 7516.06 6749.61 6138.35 =============== 627-00001 Pvmt Mkg Paint Gallon ================================================= STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 2,860.00 40.00 31.86 32.00 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 10.00 125.00 135.77 89.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,870.00 40.30 32.40 32.20 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 5,137.00 20.00 38.72 37.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5,137.00 20.00 38.72 37.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,007.00 27.27 36.45 35.28 =============== 627-00002 Thermoplastic Pvmt Mkg Sq Foot ================================================ STM0252-469 R2 ADA RAMPS I-25 INT S NEV- 09/06/18 500.00 15.00 16.50 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 500.00 15.00 16.50 15.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 500.00 15.00 16.50 15.00 =============== 627-00003 Thermoplastic Pvmt Mkg (Inlaid) Sq Foot ================================================ ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 369.00 45.00 22.81 17.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 369.00 45.00 22.81 17.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 369.00 45.00 22.81 17.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 547 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-00005 Epoxy Pvmt Mkg Gallon ================================================= STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 4.00 100.00 1093.85 706.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 100.00 1093.85 706.25 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 1,736.00 90.68 90.68 90.68 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,736.00 90.68 90.68 90.68 NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 8.00 250.00 352.00 370.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 883.00 90.00 75.72 80.00 MTCE0253-267 MTCE R4 FY19 I25 CONCRETE PAN 12/13/18 25.00 150.00 153.80 158.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1,400.00 77.14 77.14 77.14 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,316.00 83.43 77.81 80.11 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,056.00 86.55 82.79 85.25 =============== 627-00006 Mod Epoxy Pvmt Mkg (On-Call) Gallon ================================================= MTCER300-245 MTCE R3 FY 18/19 REGIONWIDE E 03/29/18 1,100.00 60.00 61.63 51.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,100.00 60.00 61.63 51.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,100.00 60.00 61.63 51.50 =============== 627-00008 Mod Epoxy Pvmt Mkg Gallon ================================================= STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 74.00 200.00 223.45 220.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 1,114.00 75.00 80.00 70.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 160.00 150.00 153.72 100.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 399.00 100.00 106.00 120.00 STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 820.00 80.00 76.00 76.00 ER1151-033 PR SH 115-MP 34.7 01/25/18 5.00 65.00 565.54 650.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 548 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-00008 Mod Epoxy Pvmt Mkg Gallon ================================================= FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 101.00 200.00 119.63 105.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 36.00 200.00 207.16 147.04 STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 21.00 75.00 361.67 360.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 38.00 200.00 188.96 175.00 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 10.00 65.00 273.75 270.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 952.00 77.00 74.11 80.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 91.00 150.00 114.86 98.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 268.00 135.00 107.39 89.00 FSAR200-247 US 287 FROM MP 0.00 (STATE LI 03/08/18 1,532.00 75.00 115.00 125.00 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 3.00 125.31 105.00 105.00 MTCER300-245 MTCE R3 FY 18/19 REGIONWIDE E 03/29/18 21,494.00 56.00 58.44 51.50 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 114.00 67.00 83.50 87.00 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 12.00 80.00 360.00 286.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 27,244.00 62.99 66.56 61.58 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 10.00 68.00 299.67 580.00 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 550.00 60.00 74.33 81.00 FSA0711-020 SH 71 & SH 94: PUNKIN CENTER 05/03/18 69.00 125.00 191.67 150.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 392.00 250.00 77.38 74.51 MTCE R100-312 R1 CHIP SEAL 05/17/18 933.00 65.00 85.00 85.00 MPR200-251 R2 FY19 PAVEMENT MARKING 06/21/18 22,738.00 49.50 52.95 52.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 24,692.00 53.72 54.53 55.20 MTCE R100-313 R1 FY19/20 REGIONWIDE PAVEMEN 07/05/18 49,085.00 51.00 53.13 54.25 FBR060A-022 SH 60 over the South Platte 07/12/18 59.00 150.00 124.98 105.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 58.40 200.00 181.90 170.00 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 81.00 80.00 152.00 151.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 6.00 300.00 391.63 437.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 49,289.40 51.37 54.33 54.65 BR1131-006 SH 113 AT MP 11.5 10/11/18 26.00 275.00 137.93 138.89 MTCER400-365 REGION 4 FY 19 EPOXY 1 10/18/18 13,958.00 54.00 56.25 53.25 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 507.00 70.00 91.38 84.00 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 134.00 80.00 147.52 98.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 39.00 155.00 339.86 340.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 549 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-00008 Mod Epoxy Pvmt Mkg Gallon ================================================= NHPP0702-366 I-70 Avon to Vail 11/08/18 604.00 75.00 95.18 92.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 1,290.00 82.00 89.00 88.20 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 67.00 270.00 345.00 425.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 33.00 200.00 265.50 350.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 60.00 100.00 128.89 112.10 ER052A-039 SH 170 11/15/18 2.00 65.00 901.23 504.00 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 171.00 100.00 88.08 83.61 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 45.00 75.00 275.00 300.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 627.00 130.00 74.14 72.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 271.00 75.00 113.80 117.30 STA052A-045 SH 52B NEW RAYMER SOUTH 12/13/18 726.00 76.00 112.00 74.00 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 2.00 300.00 498.33 506.00 STAR100-279 FY20 HMA PREVENTATIVE MAINTEN 12/13/18 301.00 85.00 74.13 72.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 18,863.00 63.55 71.03 64.37 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 120,088.40 56.40 60.77 57.86 =============== 627-00009 Mod Epoxy (Inlaid) Gallon ================================================= SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 40.00 120.00 270.00 270.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 908.00 140.00 172.66 172.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 86.00 135.00 248.92 245.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,034.00 138.81 185.89 181.90 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 73.00 175.00 233.24 260.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 73.00 175.00 233.24 260.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 45.00 180.00 200.45 180.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 19.00 185.00 441.05 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 64.00 181.48 255.34 245.31 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 689.00 180.00 122.50 120.00 SHER200-243 R2 WRONG WAY PREVENTION 10/18/18 34.00 200.00 520.00 510.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 550 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-00009 Mod Epoxy (Inlaid) Gallon ================================================= NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 1,288.00 185.00 113.78 98.85 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 66.00 198.22 198.22 198.22 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 23.00 95.00 286.80 300.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 1,145.00 20.00 122.25 105.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 672.00 125.00 107.53 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,917.00 125.42 120.61 110.99 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,088.00 129.56 143.33 129.23 =============== 627-00011 Pvmt Mkg Paint (Waterborne) Gallon ================================================= SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 12.00 170.00 200.00 200.00 NHPP0702-373 I-70 GWC Longitudinal Joint R 01/11/18 37.00 80.00 257.50 265.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 338.00 50.00 71.63 48.50 CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 100.00 63.86 48.00 48.00 STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 564.00 30.00 28.00 28.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 399.00 44.00 75.48 130.96 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 506.00 50.00 44.37 45.00 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 50.00 59.70 50.00 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,006.00 45.39 59.51 63.17 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 4.00 45.00 260.60 50.00 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 68.00 40.00 100.07 85.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 72.00 40.28 108.98 83.06 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 2,487.00 50.00 36.34 41.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 47.00 65.00 61.89 55.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 76.00 40.00 59.40 56.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,610.00 49.98 38.83 41.69 BR1131-006 SH 113 AT MP 11.5 10/11/18 22.00 100.00 72.93 72.22 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 3,863.00 65.00 42.43 33.30 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 200.00 160.00 67.67 70.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 551 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-00011 Pvmt Mkg Paint (Waterborne) Gallon ================================================= NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 54.00 150.00 148.00 145.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,139.00 70.89 46.84 36.74 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,827.00 58.66 48.27 44.59 =============== 627-00012 Pvmt Mkg Paint (Low VOC Solvent Base) Gallon ================================================= NH0242-071 US 24 & 31ST STREET and US24 05/03/18 148.00 33.33 51.37 57.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 148.00 33.33 51.37 57.00 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 10.00 250.00 186.48 75.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 250.00 186.48 75.90 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 158.00 47.04 57.19 58.20 =============== 627-00013 Pvmt Mkg Paint (High Build) Gallon ================================================= STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 1,941.00 45.00 58.52 58.00 STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 148.00 100.00 65.98 60.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 4,412.00 30.00 40.46 37.75 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 1,425.00 27.00 43.25 43.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 140.00 65.00 82.26 75.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR MTCE0712-017 SH 71 CHIP SEAL MP 123 TO MP 01/18/18 3,181.00 30.00 35.56 23.68 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 1,044.00 30.00 59.98 52.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 532.00 30.00 39.38 59.91 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 3,365.00 30.00 33.36 36.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 284.00 40.00 43.19 40.00 NHPP5502-096 US550 STRIPING & RUMBLE STRIP 03/01/18 3,499.00 28.00 34.61 30.91 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 10.00 28.00 74.00 80.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 940.00 37.50 37.55 39.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 3,252.00 45.00 31.32 34.75 MTCER500-202 R5 FY18 STRIPING 03/08/18 62,500.00 24.00 24.49 21.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 1,422.00 90.24 82.03 79.58 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 571.00 70.00 36.50 38.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 88,666.00 28.03 28.59 26.61 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 552 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-00013 Pvmt Mkg Paint (High Build) Gallon ================================================= FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 38.00 300.00 124.24 106.67 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 34.00 40.00 124.60 96.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 28.00 200.00 126.03 167.20 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 1,580.00 30.00 36.19 50.75 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 1,484.00 28.00 35.22 32.87 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 20.00 50.00 70.00 70.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,184.00 34.02 41.05 44.71 FBR060A-022 SH 60 over the South Platte 07/12/18 160.00 70.00 51.14 45.00 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 124.00 50.00 113.42 108.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 36.00 44.25 154.54 138.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 9,026.00 30.23 30.23 30.23 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 940.00 38.00 46.52 45.00 STA052A-040 SH 52: Antelope Creek 08/23/18 3.00 350.00 455.00 460.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 1,907.00 30.00 42.14 43.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 38.00 86.00 98.18 61.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12,234.00 31.80 44.29 34.85 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 2,511.00 40.00 30.75 26.00 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 614.00 35.00 36.70 32.00 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 583.00 48.00 62.14 52.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 2,627.00 37.50 35.05 34.65 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 7,900.00 40.00 27.96 17.33 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 158.00 60.00 68.11 64.90 ER052A-039 SH 170 11/15/18 6.00 28.00 255.87 133.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 175.00 82.97 69.65 69.65 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 2,202.00 45.00 36.91 34.84 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 84.00 45.00 137.50 150.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 1,794.00 42.00 34.61 36.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 2,978.00 40.00 39.38 38.69 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 12,000.00 45.00 36.17 32.00 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 3,262.00 35.00 39.50 40.60 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 693.00 450.00 44.10 45.48 STA052A-045 SH 52B NEW RAYMER SOUTH 12/13/18 1,851.00 40.00 62.67 46.00 STAR100-279 FY20 HMA PREVENTATIVE MAINTEN 12/13/18 5,529.00 30.00 25.98 13.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 2,800.00 36.42 36.42 36.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 47,767.00 45.93 36.79 30.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 151,851.00 34.09 31.58 28.79 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 553 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-00014 Pvmt Mkg Paint (Low Temp) Gallon ================================================= NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 40.00 80.00 90.24 70.72 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 40.00 80.00 90.24 70.72 NHPP0702-366 I-70 Avon to Vail 11/08/18 1,517.00 45.00 38.07 36.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,517.00 45.00 38.07 36.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,557.00 45.90 39.08 37.62 =============== 627-00029 24 In Pvmt Mkg Tape (Rem) Lin Foot =============================================== STA086A-051 SH 86; WEST OF I-70 11/29/18 48.00 25.00 19.72 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 48.00 25.00 19.72 25.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 48.00 25.00 19.72 25.00 =============== 627-00030 Raised Pvmt Marker (Temp) Each =================================================== STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 24,611.00 2.00 1.89 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 24,611.00 2.00 1.89 2.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 24,611.00 2.00 1.89 2.00 =============== 627-00032 Raised Flex Pvmt Marker (Temp) Each =================================================== MTCE R100-312 R1 CHIP SEAL 05/17/18 3,000.00 2.50 2.00 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,000.00 2.50 2.00 2.00 STAR100-279 FY20 HMA PREVENTATIVE MAINTEN 12/13/18 5,000.00 2.00 1.30 0.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5,000.00 2.00 1.30 0.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,000.00 2.19 1.46 1.06 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 554 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-00070 Preform Thermoplastic Pvmt Mkg Sq Foot ================================================ NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 22.00 50.00 21.00 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 22.00 50.00 21.00 21.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 126.00 50.00 14.03 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 126.00 50.00 14.03 16.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 30.00 20.00 111.83 105.00 STA052A-045 SH 52B NEW RAYMER SOUTH 12/13/18 544.00 15.00 16.25 11.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 574.00 15.26 25.75 16.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 722.00 22.38 23.17 16.27 =============== 627-01001 Preform Plastic Pvmt Mkg (Ty I) Sq Foot ================================================ BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 1,774.00 12.00 13.50 13.09 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,774.00 12.00 13.50 13.09 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 641.00 12.00 12.24 11.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 641.00 12.00 12.24 11.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,415.00 12.00 13.29 12.61 =============== 627-01010 Preform Plastic Pvmt Mkg (TY I)(Inlaid) Sq Foot ================================================ FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 1,383.00 18.00 14.92 13.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 3,948.00 10.00 13.49 11.98 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 1,033.00 12.00 11.50 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6,364.00 12.06 13.83 12.20 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 555 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-01010 Preform Plastic Pvmt Mkg (TY I)(Inlaid) Sq Foot ================================================ NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 6,233.00 15.00 11.67 11.30 MTCE0701-246 MTCE R3 FY18 I-70 CENTERLINE 05/03/18 26,900.00 9.25 10.70 9.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 22,384.00 11.00 12.97 12.38 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 3,527.00 20.00 15.00 15.00 MPR200-251 R2 FY19 PAVEMENT MARKING 06/21/18 48,866.00 10.00 9.64 9.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 107,910.00 10.64 10.78 10.14 MTCE R100-313 R1 FY19/20 REGIONWIDE PAVEMEN 07/05/18 149,860.00 9.00 9.10 9.15 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 877.00 20.00 19.00 17.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 918.00 22.00 22.85 21.55 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 809.00 20.00 18.86 18.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 459.00 14.00 17.82 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 152,923.00 9.21 9.72 9.34 SHER200-243 R2 WRONG WAY PREVENTION 10/18/18 6,237.00 13.80 14.64 14.27 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 3,091.00 12.50 14.57 14.57 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 279.00 20.00 20.58 20.50 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 43.00 20.00 21.11 16.75 NHPP0702-366 I-70 Avon to Vail 11/08/18 6,080.00 14.00 13.48 13.00 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 4,048.00 17.00 16.83 19.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 557.00 16.08 16.08 16.08 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 19,706.00 12.00 12.66 14.23 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 34,923.00 12.00 12.98 11.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 9,332.00 13.00 13.96 14.30 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 652.00 15.00 21.33 23.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 84,948.00 12.72 13.41 13.17 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 352,145.00 10.55 11.29 10.56 =============== 627-02010 Preform Plastic Pvmt Mkg (Ty II)(Inlaid) Sq Foot ================================================ NHPP0702-373 I-70 GWC Longitudinal Joint R 01/11/18 3,707.00 20.00 20.50 20.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 2,125.00 12.50 16.45 16.36 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 556 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-02010 Preform Plastic Pvmt Mkg (Ty II)(Inlaid) Sq Foot ================================================ FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 638.00 18.00 20.78 17.43 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 777.00 18.00 15.66 14.50 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 663.00 12.00 18.63 18.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 9,283.00 10.00 12.50 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 17,193.00 13.20 16.04 15.35 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 775.00 20.00 14.00 14.00 MPR200-251 R2 FY19 PAVEMENT MARKING 06/21/18 37,627.00 12.00 10.48 9.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 38,402.00 12.16 10.49 9.84 MTCE R100-313 R1 FY19/20 REGIONWIDE PAVEMEN 07/05/18 98,618.00 9.70 9.58 9.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 98,618.00 9.70 9.58 9.60 NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 2,002.00 20.00 16.50 16.00 MTCER400-365 REGION 4 FY 19 EPOXY 1 10/18/18 135,720.00 9.75 10.05 9.85 FSA076A-011 I-76 FROM MM 25 TO MM 100 10/18/18 109,332.00 9.80 10.96 10.25 SHER200-243 R2 WRONG WAY PREVENTION 10/18/18 24,601.00 14.75 15.22 15.19 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 36.00 20.00 26.09 22.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 30,135.00 12.00 11.18 11.03 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 1,310.00 20.00 18.67 20.00 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 905.00 12.00 19.75 21.50 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 1,051.00 14.00 15.44 15.86 MTCE0253-267 MTCE R4 FY19 I25 CONCRETE PAN 12/13/18 120.00 14.00 15.56 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 305,212.00 10.53 10.92 10.68 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 459,425.00 10.59 10.87 10.55 =============== 627-30205 Thermoplastic Pvmt Mkg (WS) Sq Foot ================================================ NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 904.00 25.00 21.49 19.98 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 904.00 25.00 21.49 19.98 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 904.00 25.00 21.49 19.98 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 557 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-30210 Thermoplastic Pvmt Mkg (XS) Sq Foot ================================================ NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 14.00 20.00 14.74 12.48 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 14.00 20.00 14.74 12.48 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 336.00 16.00 16.58 15.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 336.00 16.00 16.58 15.75 FBR060A-022 SH 60 over the South Platte 07/12/18 120.00 25.00 14.88 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 120.00 25.00 14.88 12.00 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 744.00 14.00 19.67 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 744.00 14.00 19.67 18.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,214.00 15.71 17.51 16.72 =============== 627-30310 Plastic Pvmt Mkg (60 Mil) (XS) Sq Foot ================================================ ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 1,200.00 18.50 15.11 20.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,200.00 18.50 15.11 20.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,200.00 18.50 15.11 20.00 =============== 627-30323 Preform Plastic Pvmt Mkg (WS)(Typ I)(In) Sq Foot ================================================ FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 2,156.00 15.00 21.51 21.84 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,156.00 15.00 21.51 21.84 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,156.00 15.00 21.51 21.84 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 558 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-30324 Preform Plastic Pvmt Mkg (WS) (TY I) Sq Foot ================================================ NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 116.00 20.00 37.00 42.00 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 444.00 25.00 26.56 20.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 117.00 22.00 25.01 20.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 406.00 18.00 40.03 47.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,083.00 21.52 31.27 32.48 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,083.00 21.52 31.27 32.48 =============== 627-30326 Preform Plastic Pvmt Mkg (WS) (Ty II) Sq Foot ================================================ STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 179.00 23.00 27.73 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 179.00 23.00 27.73 22.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 179.00 23.00 27.73 22.00 =============== 627-30328 Pre Plastic Pvmt Mkg (XWalk)(Typ1)(In) Sq Foot ================================================ FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 10,126.00 11.00 14.15 14.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10,126.00 11.00 14.15 14.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10,126.00 11.00 14.15 14.60 =============== 627-30329 Preform Plastic Pvmt Mkg (XS) (TY I) Sq Foot ================================================ FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 1,080.00 15.00 15.35 14.50 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 640.00 15.00 13.02 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,720.00 15.00 14.60 13.94 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,720.00 15.00 14.60 13.94 =============== 627-30405 Preform Thermoplastic Pvmt Mkg (WS) Sq Foot ================================================ SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 119.00 20.00 14.00 14.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 1,183.00 14.00 18.50 20.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 559 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-30405 Preform Thermoplastic Pvmt Mkg (WS) Sq Foot ================================================ BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 179.00 16.00 19.94 18.54 STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 551.00 18.00 21.70 18.10 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 400.00 20.00 15.29 17.00 NHPP5502-096 US550 STRIPING & RUMBLE STRIP 03/01/18 1,646.00 20.00 13.80 11.20 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 216.00 16.00 21.19 21.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 1,633.00 17.00 15.05 15.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 1,276.00 12.00 19.52 20.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 880.00 15.00 15.50 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8,083.00 16.38 16.51 16.39 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 545.00 15.00 18.06 21.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 2,799.00 17.00 14.54 13.42 MTCE R100-312 R1 CHIP SEAL 05/17/18 225.00 15.00 20.00 20.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 1,630.00 20.00 25.00 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,199.00 17.64 16.37 18.13 MTCE R100-313 R1 FY19/20 REGIONWIDE PAVEMEN 07/05/18 23,603.00 20.00 10.58 10.00 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 109.00 25.00 19.35 18.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 638.00 18.00 20.05 17.75 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 307.00 18.00 16.70 17.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 620.00 15.00 16.56 22.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 28.00 20.00 32.38 22.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 25,305.00 19.82 11.72 10.62 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 680.00 20.00 17.50 17.00 SHER200-243 R2 WRONG WAY PREVENTION 10/18/18 8,867.00 12.50 13.44 12.88 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 729.00 17.00 22.22 21.85 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 3,102.00 23.00 12.00 7.00 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 696.00 22.00 20.00 24.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 142.00 13.00 26.69 21.24 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 14,954.00 12.00 11.93 12.72 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 110.00 17.00 22.00 24.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 154.00 20.00 17.31 18.50 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 3,340.00 16.50 15.87 14.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 270.00 20.00 23.15 26.13 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 560 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-30405 Preform Thermoplastic Pvmt Mkg (WS) Sq Foot ================================================ STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 4,123.00 20.00 17.31 18.00 STAR100-279 FY20 HMA PREVENTATIVE MAINTEN 12/13/18 97.00 15.00 25.40 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 37,264.00 14.87 13.86 13.69 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 75,851.00 16.87 13.96 13.26 =============== 627-30407 Preform Thermoplastic Pvmt Mkg (WS)(Sp) Sq Foot ================================================ STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 719.00 20.00 21.68 20.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 525.00 24.00 16.00 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,244.00 21.69 18.31 17.89 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 772.00 30.00 26.00 26.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 772.00 30.00 26.00 26.00 SHER200-243 R2 WRONG WAY PREVENTION 10/18/18 2,784.00 15.00 16.67 16.33 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 707.00 17.15 17.15 17.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,491.00 15.44 16.72 16.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,507.00 18.89 17.93 18.14 =============== 627-30408 Pre Thermo Pvmt Mkg (Shield) Sq Foot ================================================ FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 150.00 27.00 30.63 32.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 150.00 27.00 30.63 32.00 MTCE R100-313 R1 FY19/20 REGIONWIDE PAVEMEN 07/05/18 4,770.00 23.00 22.63 23.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,770.00 23.00 22.63 23.00 SHER200-243 R2 WRONG WAY PREVENTION 10/18/18 3,968.00 28.00 29.90 28.80 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 561 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-30408 Pre Thermo Pvmt Mkg (Shield) Sq Foot ================================================ STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 808.00 25.00 32.84 26.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,776.00 27.49 31.12 28.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,696.00 25.27 27.70 25.76 =============== 627-30410 Preform Thermoplastic Pvmt Mkg (XS) Sq Foot ================================================ FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 144.00 25.00 48.95 52.89 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 3,705.00 16.00 11.63 13.00 MTCE0712-017 SH 71 CHIP SEAL MP 123 TO MP 01/18/18 60.00 22.00 30.02 21.05 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 254.00 10.00 14.08 13.09 STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 728.00 15.00 18.25 16.75 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 179.00 12.00 11.83 11.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 3,381.00 17.00 10.54 11.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 272.00 10.00 14.38 16.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 688.00 15.00 13.35 12.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 2,774.00 12.00 9.88 10.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12,185.00 15.07 11.74 12.54 STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 68.00 23.00 26.89 23.00 FSA0711-020 SH 71 & SH 94: PUNKIN CENTER 05/03/18 100.00 24.00 18.33 14.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 7,542.00 10.00 11.19 10.74 MTCE R100-312 R1 CHIP SEAL 05/17/18 392.00 11.59 15.00 15.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 3,247.00 30.00 16.00 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 11,349.00 15.98 11.87 12.49 MTCE R100-313 R1 FY19/20 REGIONWIDE PAVEMEN 07/05/18 47,048.00 10.00 8.75 8.25 NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 780.00 20.00 27.00 27.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 426.00 18.00 13.80 12.50 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 2,540.00 18.00 12.78 12.55 C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 1,175.00 12.50 14.73 14.50 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 1,912.00 12.00 14.36 14.95 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 72.00 20.00 21.25 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 53,953.00 10.72 9.81 9.14 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 762.00 15.00 12.38 12.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 562 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-30410 Preform Thermoplastic Pvmt Mkg (XS) Sq Foot ================================================ NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 64.00 13.00 13.58 12.49 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 620.00 18.00 11.00 7.00 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 496.00 17.00 14.33 17.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 48.00 13.00 21.06 17.70 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 242.00 11.79 11.78 11.78 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 1,939.00 12.00 16.37 14.17 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 1,248.00 6.50 16.60 25.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 283.00 20.00 11.93 12.50 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 5,529.00 12.50 13.82 12.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 256.00 20.00 17.48 20.10 C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 525.00 15.00 13.70 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 12,012.00 12.86 14.55 13.90 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 89,499.00 12.27 11.39 10.67 =============== 627-30411 Preform Thermoplastic Pvmt Mkg (XS)(Sp) Sq Foot ================================================ STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 5,288.00 15.00 16.78 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,288.00 15.00 16.78 18.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 1,110.00 11.00 15.15 17.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 714.00 20.00 17.00 17.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,824.00 14.52 15.33 17.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 736.00 12.00 16.20 18.00 NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 728.00 15.00 12.00 12.00 NHPP070A-032 I-70B & Z GRAND JCT PHASE 1 A 09/20/18 248.00 20.00 19.25 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,712.00 14.43 15.83 15.45 SHER200-243 R2 WRONG WAY PREVENTION 10/18/18 11,299.00 12.00 14.05 12.60 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 684.00 11.79 11.78 11.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 11,983.00 11.99 13.98 12.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20,807.00 13.18 15.02 14.57 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 563 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-40003 Methyl Methacrylate Pvmt Mkg (Inlaid) Sq Foot ================================================ BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 2,263.00 25.00 26.75 27.27 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,263.00 25.00 26.75 27.27 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,263.00 25.00 26.75 27.27 =============== 628-00135 Brdg Girder+Deck Unit (135-140) Each =================================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 2.00 258176.51 265492.50 265492.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 258176.51 265492.50 265492.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 258176.51 265492.50 265492.50 =============== 629-01001 Survey Monument (Ty 1) Each =================================================== SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 205.00 500.00 281.07 363.20 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 8.00 224.00 350.79 275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 213.00 489.63 286.89 359.89 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 5.00 1470.00 294.00 294.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 165.00 450.00 225.12 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 170.00 480.00 225.64 299.82 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 383.00 485.36 256.40 333.23 =============== 629-01002 Survey Monument (Ty 2) Each =================================================== SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 44.00 700.00 433.52 670.55 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 16.00 200.00 505.25 450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 60.00 566.67 474.51 611.74 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 60.00 566.67 474.51 611.74 =============== 629-01003 Survey Monument (Ty 3) Each =================================================== ER144A-002 SH 144 East and West of Goodr 03/08/18 1.00 800.00 1283.66 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 800.00 1283.66 1500.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 564 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 629-01003 Survey Monument (Ty 3) Each =================================================== FBR060A-022 SH 60 over the South Platte 07/12/18 4.00 310.00 914.91 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 310.00 914.91 1000.00 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 1.00 1500.00 933.86 930.00 STA052A-045 SH 52B NEW RAYMER SOUTH 12/13/18 3.00 300.00 895.00 760.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 600.00 908.88 802.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 493.33 964.95 967.78 =============== 629-01004 Survey Monument (Ty 4) Each =================================================== BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 18.00 300.00 367.21 215.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 18.00 300.00 367.21 215.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18.00 300.00 367.21 215.00 =============== 629-01005 Survey Monument (Ty 5) Each =================================================== NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 5.00 300.00 1600.00 1600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 300.00 1600.00 1600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 300.00 1600.00 1600.00 =============== 629-01006 Survey Monument (Ty 6) Each =================================================== NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 13.00 200.00 550.50 400.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 15.00 1470.00 98.00 98.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 28.00 880.36 477.52 238.21 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 28.00 880.36 477.52 238.21 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 565 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 629-01011 Survey Monument (Ty 1A) Each =================================================== STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 6.00 375.00 395.78 493.11 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 375.00 395.78 493.11 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 375.00 395.78 493.11 =============== 629-01031 Survey Monument (Ty 3A) Each =================================================== ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 3.00 650.00 787.20 500.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 650.00 787.20 500.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 2.00 950.00 907.50 790.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 1.00 900.00 759.60 450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 933.33 836.77 676.67 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 1.00 500.00 921.88 885.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 5.00 450.00 910.06 700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 458.33 913.43 730.83 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 625.00 858.03 659.58 =============== 629-01041 Survey Mont (Special) Each =================================================== SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 1.00 700.00 1141.67 725.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 700.00 1141.67 725.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 700.00 1141.67 725.00 =============== 629-01065 Survey Monument (Ty 5S) Each =================================================== NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 6.00 1600.00 750.00 750.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 566 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 629-01065 Survey Monument (Ty 5S) Each =================================================== NHPP070A-032 I-70B & Z GRAND JCT PHASE 1 A 09/20/18 29.00 300.00 762.50 720.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 35.00 522.86 761.33 725.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 35.00 522.86 761.33 725.14 =============== 629-01110 Locate Monuments Hour =================================================== FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 10.00 150.00 209.56 140.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 6.00 240.00 178.06 197.24 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16.00 183.75 199.34 161.47 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 400.00 140.00 137.15 156.45 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 10.00 200.00 181.88 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 410.00 141.46 140.91 156.29 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 10.00 200.00 254.58 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 200.00 254.58 350.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 436.00 144.36 147.14 160.93 =============== 629-01210 Adjust Monument Box Each =================================================== STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 6.00 450.00 343.44 328.74 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 450.00 343.44 328.74 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 450.00 343.44 328.74 =============== 630-00000 Flagging Hour =================================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 1,632.00 25.00 29.33 23.66 STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 3,100.00 24.00 24.36 22.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 567 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00000 Flagging Hour =================================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 2,420.00 28.00 32.15 28.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 100.00 30.00 29.00 29.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 12,500.00 25.00 21.17 21.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 4,000.00 30.00 27.63 27.50 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 2,550.00 27.00 26.19 24.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR NHPP0702-373 I-70 GWC Longitudinal Joint R 01/11/18 700.00 28.00 35.00 42.00 MTCER100-296 MTCE R1 FY18 WEST SIGN REPLAC 01/11/18 200.00 26.00 25.50 5.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 2,000.00 28.00 28.88 25.50 MTCE0712-017 SH 71 CHIP SEAL MP 123 TO MP 01/18/18 800.00 30.00 24.33 20.00 ITSSW01-833 ABOUT 1.5 MILES NORTH OF THE 01/18/18 20.00 25.00 29.00 28.00 STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 2,000.00 30.00 30.00 30.00 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 400.00 30.00 29.44 29.75 NHPP5502-088 US 550 RIVERSIDE SNOW SHED LI 01/25/18 800.00 25.00 30.61 24.36 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 300.00 25.00 27.00 22.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 200.00 26.00 29.85 33.05 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 1,000.00 22.00 30.14 28.32 C0703-440 AVALANCHE CONTROL SYSTEM: EJM 02/01/18 200.00 30.00 37.58 39.00 STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 200.00 28.00 16.67 20.00 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 6,400.00 25.00 20.57 21.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 500.00 25.00 27.69 35.00 NHPP5502-096 US550 STRIPING & RUMBLE STRIP 03/01/18 350.00 30.00 29.75 23.00 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 400.00 35.00 29.06 26.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 12,000.00 27.00 26.76 27.50 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 2,500.00 28.00 14.93 27.00 NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 3,800.00 25.00 22.07 20.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 1,000.00 30.00 26.77 25.75 MTCER500-201 R5 FY18 SIGN REPLACEMENT 03/08/18 300.00 25.00 19.54 20.00 MTCER500-203 WITHIN CDOT'S R5 MAINTENANCE 03/08/18 1,800.00 23.00 21.00 21.00 NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 80.00 35.00 29.17 28.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 200.00 25.00 26.50 26.00 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 3,000.00 36.74 27.00 27.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 1,000.00 35.00 25.50 25.00 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 2,300.00 30.00 30.00 26.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 70,752.00 27.11 24.56 24.60 NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPL 04/05/18 40.00 28.00 42.15 79.45 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 1,600.00 20.00 27.40 26.00 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 1,900.00 23.00 24.06 23.40 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 700.00 35.00 29.00 30.00 STAR400-347 Various intersections across 04/12/18 100.00 30.00 27.00 25.00 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 500.00 26.00 23.52 22.25 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 3,000.00 28.00 20.79 12.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 568 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00000 Flagging Hour =================================================== STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 60.00 30.00 29.41 26.25 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 1,200.00 25.00 25.07 27.00 MTCE0701-246 MTCE R3 FY18 I-70 CENTERLINE 05/03/18 150.00 15.00 16.75 14.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 500.00 20.00 26.99 30.00 FSA0711-020 SH 71 & SH 94: PUNKIN CENTER 05/03/18 150.00 28.00 30.67 33.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 4,000.00 22.00 27.95 26.30 FBR0705-087 I-70: EMERGENCY BRIDGE G-25-K 05/16/18 300.00 31.00 31.00 31.00 MTCE R100-312 R1 CHIP SEAL 05/17/18 1,000.00 35.00 35.00 35.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 3,000.00 30.00 25.00 25.00 MTCER300-244 MTCE R3 FY 18/19 REGIONWIDE S 05/31/18 520.00 25.00 17.00 15.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 250.00 28.00 30.31 31.25 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 2,240.00 30.00 25.50 25.00 ER055A-001 PR SH 55 FLOOD REPAIR 2015 06/28/18 1,000.00 28.00 27.96 23.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 22,210.00 26.43 24.99 24.09 NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 900.00 28.00 28.00 28.00 FBR060A-022 SH 60 over the South Platte 07/12/18 500.00 28.00 38.77 55.00 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 400.00 25.00 35.32 28.20 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 1,300.00 22.00 24.32 23.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 1,000.00 28.00 26.92 26.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 1,600.00 28.00 24.28 26.85 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 20,430.00 25.45 25.45 25.45 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 400.00 30.00 45.49 28.50 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 150.00 25.00 29.13 27.50 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 720.00 28.00 28.83 28.25 C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 600.00 28.00 28.25 25.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 1,832.00 26.50 26.39 27.00 STA052A-040 SH 52: Antelope Creek 08/23/18 500.00 30.00 23.92 25.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 3,500.00 25.00 26.83 22.00 M850-027 US24E MANITOU AVE. AT RUXTON 08/28/18 150.00 36.00 30.20 25.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 200.00 23.00 28.39 26.00 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 3,200.00 25.00 26.88 33.00 STM0252-469 R2 ADA RAMPS I-25 INT S NEV- 09/06/18 3,000.00 25.00 29.13 28.25 NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 1,200.00 28.00 27.00 27.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 300.00 26.00 26.49 26.00 NHPP070A-032 I-70B & Z GRAND JCT PHASE 1 A 09/20/18 1,400.00 28.00 19.73 8.00 STMR200-246 R2–2018 CRITICAL CULVERTS REP 09/20/18 160.00 35.00 29.00 29.00 MTCE0704-244 Crack Seal I-70 MP 328 TO MP 09/27/18 800.00 28.00 33.00 33.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 44,242.00 25.95 27.28 26.09 NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 400.00 30.00 29.50 29.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 569 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00000 Flagging Hour =================================================== BR1131-006 SH 113 AT MP 11.5 10/11/18 1,000.00 28.00 25.24 27.78 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 40.00 26.00 39.50 39.00 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 4,480.00 28.00 24.00 24.00 SHER200-243 R2 WRONG WAY PREVENTION 10/18/18 200.00 25.00 22.50 20.00 SHE2254-092 SH225 AND 17TH PLACE IMPROVEM 10/18/18 24.00 24.60 37.00 28.00 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 1,872.00 28.00 27.00 29.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 10,000.00 25.00 23.19 24.57 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 2,200.00 28.00 26.89 28.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 300.00 30.00 34.51 26.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 5,000.00 28.00 25.38 30.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 1,920.00 31.00 28.95 28.35 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 7,500.00 24.00 21.50 22.00 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 200.00 25.00 31.50 30.00 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 40.00 30.00 29.71 30.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 2,000.00 25.00 30.00 27.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 1,200.00 28.00 42.11 47.20 ER052A-039 SH 170 11/15/18 320.00 28.00 29.20 28.00 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 800.00 29.00 28.00 28.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 5,000.00 29.40 30.31 30.31 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 2,200.00 25.00 34.62 37.16 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 3,200.00 20.00 25.36 30.00 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 640.00 35.00 25.50 26.00 C R500-198 R5 GUARDRAIL REPLACEMENT/UPGR 11/29/18 1,500.00 30.00 27.15 28.50 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 640.00 28.00 32.57 25.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 2,960.00 28.00 25.93 29.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 1,120.00 28.00 31.06 30.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 3,000.00 27.00 23.09 22.11 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 80.00 30.00 38.85 26.00 C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 450.00 28.00 31.10 26.50 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 2,400.00 27.00 21.52 20.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 10,000.00 28.00 28.39 28.87 STA052A-045 SH 52B NEW RAYMER SOUTH 12/13/18 2,500.00 28.00 29.00 29.50 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 200.00 35.00 28.00 31.00 STAR100-279 FY20 HMA PREVENTATIVE MAINTEN 12/13/18 2,400.00 30.00 24.25 20.00 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 160.00 30.00 27.86 28.00 MPR200-252 REGION 2 - PUEBLO COUNTY HIGH 12/20/18 50.00 25.00 24.67 30.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 8,068.00 25.45 25.45 25.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 86,064.00 26.88 27.03 26.98 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 223,268.00 26.72 25.84 25.76 =============== 630-00001 Pilot Car Operation Hour =================================================== STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 660.00 50.00 60.58 65.00 MTCE0712-017 SH 71 CHIP SEAL MP 123 TO MP 01/18/18 300.00 63.00 35.00 35.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 570 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00001 Pilot Car Operation Hour =================================================== STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 480.00 50.00 55.00 55.00 NHPP5502-096 US550 STRIPING & RUMBLE STRIP 03/01/18 100.00 50.00 53.50 42.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 130.00 55.00 75.34 103.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 400.00 40.00 42.06 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,070.00 50.27 54.52 54.78 MTCE R100-312 R1 CHIP SEAL 05/17/18 600.00 50.00 55.00 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 600.00 50.00 55.00 55.00 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 300.00 60.00 50.00 55.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 3,000.00 55.00 41.88 37.64 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 1,000.00 35.00 45.00 40.00 STA052A-045 SH 52B NEW RAYMER SOUTH 12/13/18 1,900.00 60.00 48.50 50.50 STAR100-279 FY20 HMA PREVENTATIVE MAINTEN 12/13/18 600.00 60.00 51.58 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6,800.00 54.12 45.15 42.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,470.00 53.01 47.90 46.01 =============== 630-00003 Uniformed Traf Ctrl Hour =================================================== FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 220.00 68.00 79.13 76.24 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 144.00 100.00 86.63 65.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 144.00 100.00 67.50 60.00 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 300.00 100.00 108.00 130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 808.00 91.29 87.29 91.30 NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPL 04/05/18 24.00 100.00 91.00 83.00 STAR400-347 Various intersections across 04/12/18 450.00 65.00 117.00 100.00 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 600.00 80.00 97.50 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,074.00 74.16 107.36 99.62 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 10,215.00 97.89 97.89 97.89 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 571 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00003 Uniformed Traf Ctrl Hour =================================================== NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 32.00 100.00 134.00 126.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 24.00 70.00 109.75 95.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10,271.00 97.83 98.22 97.97 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 170.00 100.00 102.00 95.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 200.00 100.00 105.85 100.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 150.00 73.50 81.19 81.19 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 800.00 85.00 105.98 104.52 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 100.00 75.00 94.79 101.89 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 3,744.00 97.89 97.89 97.89 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5,164.00 94.89 101.38 98.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17,317.00 95.18 98.86 97.92 =============== 630-00004 Traf Ctrl Vehicle Each =================================================== NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 1.00 4500.00 1925.00 2350.00 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 1.00 3000.00 9722.00 3120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 3750.00 6603.20 2735.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 3750.00 6603.20 2735.00 =============== 630-00006 Uniformed Traf Ctrl (Vehicle) Hour =================================================== FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 144.00 25.00 54.88 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 144.00 25.00 54.88 7.00 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 80.00 90.00 106.38 62.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 80.00 90.00 106.38 62.50 NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 64.00 30.00 56.50 7.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 572 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00006 Uniformed Traf Ctrl (Vehicle) Hour =================================================== NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 170.00 20.00 50.00 23.00 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 800.00 25.00 31.83 23.23 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 100.00 30.00 59.55 33.96 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,134.00 24.97 37.87 23.23 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,358.00 28.81 43.85 23.82 =============== 630-00007 Traf Ctrl Inspection Day ==================================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 21.00 200.00 116.02 107.04 STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 40.00 180.00 296.21 60.00 STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 53.00 200.00 265.85 240.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 25.00 150.00 54.33 56.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 43.00 300.00 247.74 375.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 36.00 250.00 306.25 350.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 70.00 200.00 119.89 100.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR NHPP0702-373 I-70 GWC Longitudinal Joint R 01/11/18 17.00 250.00 300.00 350.00 ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 30.00 255.00 147.01 120.00 MTCER100-296 MTCE R1 FY18 WEST SIGN REPLAC 01/11/18 6.00 185.00 109.75 1.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 50.00 200.00 109.94 84.75 MTCE0712-017 SH 71 CHIP SEAL MP 123 TO MP 01/18/18 6.00 200.00 208.33 225.00 ITSSW01-833 ABOUT 1.5 MILES NORTH OF THE 01/18/18 5.00 250.00 88.50 118.00 STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 16.00 250.00 400.00 400.00 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 52.00 180.00 160.02 180.00 ER1151-033 PR SH 115-MP 34.7 01/25/18 70.00 143.57 213.59 200.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 66.00 275.00 330.12 75.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 75.00 208.00 109.46 106.23 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 20.00 250.00 613.13 707.95 STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 38.00 125.00 103.33 50.00 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 39.00 130.00 108.15 140.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 66.00 275.00 138.25 350.00 NHPP5502-096 US550 STRIPING & RUMBLE STRIP 03/01/18 4.00 160.00 269.75 105.00 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 10.00 200.00 150.00 120.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 88.00 175.00 278.50 180.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 80.00 225.00 327.93 175.00 NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 30.00 200.00 78.86 75.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 45.00 200.00 244.55 257.00 NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 18.00 300.00 101.50 150.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 26.00 150.00 158.00 156.00 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 16.00 295.23 250.00 250.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 28.00 250.00 95.00 115.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 573 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00007 Traf Ctrl Inspection Day ==================================================== NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 28.00 200.00 265.05 245.14 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,217.00 209.45 219.80 183.76 NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPL 04/05/18 14.00 225.00 154.00 177.00 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 40.00 185.00 263.15 281.25 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 222.00 125.00 265.96 374.43 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 32.00 200.00 193.33 180.00 STAR400-347 Various intersections across 04/12/18 40.00 150.00 108.33 10.00 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 110.00 180.00 134.38 133.00 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 30.00 200.00 142.50 135.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 36.00 200.00 139.92 132.00 STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 10.00 150.00 111.91 80.00 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 24.00 250.00 203.36 300.00 FSA0711-020 SH 71 & SH 94: PUNKIN CENTER 05/03/18 6.00 175.00 276.67 330.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 65.00 200.00 142.05 145.20 FBR0705-087 I-70: EMERGENCY BRIDGE G-25-K 05/16/18 10.00 175.00 175.00 175.00 MTCE R100-312 R1 CHIP SEAL 05/17/18 15.00 200.00 300.00 300.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 50.00 250.00 70.00 70.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 8.00 220.00 171.13 112.50 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 70.00 500.00 350.00 350.00 NHPP0761-230 I-76 AND COUNTY ROAD 22 AT FO 06/14/18 10.00 200.00 205.50 175.00 ER055A-001 PR SH 55 FLOOD REPAIR 2015 06/28/18 40.00 200.00 218.23 175.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 832.00 203.44 222.02 228.08 NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 20.00 175.00 280.00 280.00 FBR060A-022 SH 60 over the South Platte 07/12/18 62.00 200.00 186.46 250.00 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 10.00 200.00 336.58 164.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 23.00 80.00 161.07 128.00 SHE0701-245 I-70 MEDIAN CABLE RAIL INSTAL 07/12/18 32.00 200.00 100.00 100.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 90.00 175.00 131.67 120.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 120.00 250.00 295.10 335.30 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 132.00 106.06 106.06 106.06 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 48.00 300.00 262.63 235.00 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 30.00 175.00 180.00 110.00 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 35.00 425.00 108.73 110.00 C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 30.00 175.00 192.00 150.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 229.00 155.00 232.52 325.00 STA052A-040 SH 52: Antelope Creek 08/23/18 20.00 200.00 292.17 285.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 90.00 200.00 237.84 90.00 M850-027 US24E MANITOU AVE. AT RUXTON 08/28/18 10.00 700.00 234.37 180.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 574 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00007 Traf Ctrl Inspection Day ==================================================== BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 36.00 210.00 230.86 225.00 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 34.00 200.00 222.25 150.00 STM0252-469 R2 ADA RAMPS I-25 INT S NEV- 09/06/18 44.00 185.00 140.30 135.60 NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 20.00 250.00 160.00 160.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 220.00 180.00 251.92 230.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 18.00 200.00 377.50 110.00 NHPP070A-032 I-70B & Z GRAND JCT PHASE 1 A 09/20/18 30.00 300.00 129.00 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,383.00 195.13 226.12 205.73 NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 10.00 210.00 92.00 120.00 BR1131-006 SH 113 AT MP 11.5 10/11/18 50.00 200.00 246.15 222.22 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 19.00 175.00 174.25 167.00 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 21.00 300.00 175.00 175.00 SHE2254-092 SH225 AND 17TH PLACE IMPROVEM 10/18/18 2.00 183.76 155.00 165.00 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 31.00 300.00 227.90 295.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 64.00 190.00 185.63 203.89 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 53.00 200.00 380.10 165.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 80.00 200.00 362.14 260.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 60.00 400.00 262.61 400.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 350.00 205.00 506.32 502.95 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 44.00 130.00 100.00 100.00 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 162.00 150.00 150.33 165.00 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 10.00 200.00 184.18 250.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 86.00 250.00 193.67 175.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 36.00 200.00 282.28 324.50 ER052A-039 SH 170 11/15/18 24.00 175.00 195.25 160.00 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 16.00 155.00 270.00 270.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 95.00 210.00 129.90 129.90 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 56.00 200.00 135.08 110.32 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 58.00 185.00 178.13 235.00 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 36.00 190.00 190.00 180.00 C R500-198 R5 GUARDRAIL REPLACEMENT/UPGR 11/29/18 12.00 400.00 118.25 185.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 25.00 200.00 195.34 149.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 35.00 250.00 194.52 240.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 85.00 500.00 149.41 145.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 20.00 170.00 175.13 125.63 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 83.00 150.00 192.49 275.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 65.00 130.00 154.50 175.00 C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 23.00 175.00 294.00 165.00 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 24.00 170.00 101.04 50.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 150.00 230.00 226.30 226.43 STA052A-045 SH 52B NEW RAYMER SOUTH 12/13/18 34.00 185.00 217.33 202.00 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 29.00 200.00 59.67 89.00 STAR100-279 FY20 HMA PREVENTATIVE MAINTEN 12/13/18 30.00 180.00 194.21 200.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 575 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00007 Traf Ctrl Inspection Day ==================================================== ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 100.00 120.00 187.86 170.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 156.00 106.06 106.06 106.06 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,234.00 204.12 246.12 237.13 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,666.00 202.97 230.24 216.67 =============== 630-00012 Traf Ctrl Mgmt Day ==================================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 50.00 700.00 682.03 614.05 STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 100.00 730.00 1066.38 1500.00 STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 70.00 800.00 1200.00 1100.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 38.00 575.00 543.33 560.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 105.00 900.00 983.53 1075.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 90.00 750.00 1087.50 1250.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 175.00 750.00 732.80 675.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR NHPP0702-373 I-70 GWC Longitudinal Joint R 01/11/18 23.00 900.00 937.50 900.00 ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 60.00 1000.00 811.15 760.00 MTCER100-296 MTCE R1 FY18 WEST SIGN REPLAC 01/11/18 40.00 900.00 622.50 800.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 95.00 900.00 671.25 515.00 MTCE0712-017 SH 71 CHIP SEAL MP 123 TO MP 01/18/18 15.00 775.00 683.33 500.00 ITSSW01-833 ABOUT 1.5 MILES NORTH OF THE 01/18/18 40.00 900.00 798.50 514.00 STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 40.00 1000.00 1100.00 1100.00 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 66.00 685.00 787.49 830.00 NHPP5502-088 US 550 RIVERSIDE SNOW SHED LI 01/25/18 40.00 650.00 849.94 663.48 ER1151-033 PR SH 115-MP 34.7 01/25/18 70.00 557.14 700.33 850.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 164.00 775.00 680.19 475.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 215.00 820.00 1046.36 1416.46 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 142.00 750.00 1177.30 1072.81 C0703-440 AVALANCHE CONTROL SYSTEM: EJM 02/01/18 20.00 1000.00 1154.84 1191.00 STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 98.00 655.00 578.33 550.00 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 90.00 650.00 764.17 730.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 164.00 775.00 894.05 550.00 NHPP5502-096 US550 STRIPING & RUMBLE STRIP 03/01/18 30.00 1000.00 753.75 765.00 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 30.00 850.00 873.75 650.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 220.00 850.00 837.50 650.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 160.00 725.00 618.13 750.00 NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 80.00 800.00 762.27 725.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 65.00 725.00 840.14 910.00 MTCER500-201 R5 FY18 SIGN REPLACEMENT 03/08/18 80.00 600.00 385.86 300.00 MTCER500-203 WITHIN CDOT'S R5 MAINTENANCE 03/08/18 15.00 1500.00 1077.50 725.00 NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 10.00 850.00 596.67 600.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 576 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00012 Traf Ctrl Mgmt Day ==================================================== NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 60.00 850.00 609.40 618.80 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 40.00 1049.72 850.00 850.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 70.00 850.00 612.50 600.00 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 57.00 850.00 1077.09 905.26 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,927.00 788.65 826.14 812.84 NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPL 04/05/18 40.00 950.00 774.33 633.00 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 90.00 760.00 812.75 776.25 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 150.00 600.00 522.11 374.43 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 83.00 850.00 775.00 770.00 STAR400-347 Various intersections across 04/12/18 100.00 725.00 848.67 750.00 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 25.00 890.00 739.00 715.00 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 76.00 700.00 1250.00 1200.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 85.00 800.00 654.21 352.00 STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 25.00 800.00 817.50 875.00 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 60.00 1000.00 1134.57 1500.00 MTCE0701-246 MTCE R3 FY18 I-70 CENTERLINE 05/03/18 15.00 225.00 381.25 225.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 105.00 720.00 855.44 900.00 FSA0711-020 SH 71 & SH 94: PUNKIN CENTER 05/03/18 20.00 850.00 850.00 750.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 130.00 700.00 828.33 918.30 FBR0705-087 I-70: EMERGENCY BRIDGE G-25-K 05/16/18 42.00 910.00 910.00 910.00 MTCE R100-312 R1 CHIP SEAL 05/17/18 30.00 850.00 815.00 815.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 100.00 850.00 850.00 850.00 MTCER300-244 MTCE R3 FY 18/19 REGIONWIDE S 05/31/18 70.00 400.00 383.33 350.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 20.00 800.00 763.43 812.50 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 140.00 1500.00 1113.33 950.00 NHPP0761-230 I-76 AND COUNTY ROAD 22 AT FO 06/14/18 25.00 800.00 733.33 725.00 MPR200-251 R2 FY19 PAVEMENT MARKING 06/21/18 20.00 350.00 425.00 100.00 ER055A-001 PR SH 55 FLOOD REPAIR 2015 06/28/18 90.00 750.00 746.18 650.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,541.00 809.28 748.28 761.47 NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 45.00 900.00 720.00 720.00 FBR060A-022 SH 60 over the South Platte 07/12/18 155.00 750.00 503.08 300.00 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 65.00 850.00 871.17 800.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 57.00 500.00 628.93 583.00 SHE0701-245 I-70 MEDIAN CABLE RAIL INSTAL 07/12/18 80.00 850.00 500.00 500.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 90.00 850.00 860.00 650.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 300.00 750.00 946.55 1089.65 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 70.00 900.00 608.53 790.00 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 70.00 650.00 637.50 420.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 577 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00012 Traf Ctrl Mgmt Day ==================================================== STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 90.00 1200.00 599.15 582.00 C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 70.00 775.00 730.00 370.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 114.00 705.00 573.14 610.00 STA052A-040 SH 52: Antelope Creek 08/23/18 40.00 675.00 351.00 341.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 176.00 900.00 796.03 700.00 M850-027 US24E MANITOU AVE. AT RUXTON 08/28/18 32.00 1100.00 1037.44 520.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 90.00 815.00 609.50 600.00 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 85.00 650.00 678.50 550.00 STM0252-469 R2 ADA RAMPS I-25 INT S NEV- 09/06/18 74.00 2000.00 724.45 598.90 NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 55.00 750.00 684.00 684.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 45.00 890.00 590.16 510.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 45.00 750.00 646.50 800.00 NHPP070A-032 I-70B & Z GRAND JCT PHASE 1 A 09/20/18 75.00 900.00 862.50 660.00 STMR200-246 R2–2018 CRITICAL CULVERTS REP 09/20/18 40.00 600.00 635.00 635.00 MTCE0704-244 Crack Seal I-70 MP 328 TO MP 09/27/18 40.00 680.00 545.00 545.00 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 70.00 850.00 935.00 750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,073.00 844.94 675.11 659.12 NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 20.00 1200.00 996.00 1250.00 BR1131-006 SH 113 AT MP 11.5 10/11/18 110.00 725.00 705.15 783.33 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 95.00 850.00 755.25 751.00 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 50.00 900.00 800.00 800.00 SHER200-243 R2 WRONG WAY PREVENTION 10/18/18 150.00 600.00 300.00 300.00 SHE2254-092 SH225 AND 17TH PLACE IMPROVEM 10/18/18 5.00 812.84 871.67 715.00 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 52.00 900.00 839.03 945.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 140.00 820.00 979.88 679.65 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 113.00 750.00 687.73 780.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 10.00 725.00 988.43 775.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 125.00 1200.00 2454.59 2400.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 120.00 725.00 1192.50 1197.00 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 120.00 750.00 762.50 725.00 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 301.00 2300.00 940.00 750.00 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 175.00 850.00 550.26 342.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 214.00 800.00 910.33 815.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 90.00 700.00 386.88 354.00 ER052A-039 SH 170 11/15/18 40.00 700.00 739.87 595.00 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 80.00 750.00 780.00 780.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 230.00 1034.25 1066.23 1066.23 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 140.00 800.00 924.77 807.08 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 100.00 760.00 760.17 650.00 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 70.00 850.00 907.50 1100.00 C R500-198 R5 GUARDRAIL REPLACEMENT/UPGR 11/29/18 55.00 1100.00 687.50 700.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 55.00 750.00 912.28 831.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 70.00 750.00 718.41 800.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 578 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00012 Traf Ctrl Mgmt Day ==================================================== STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 140.00 600.00 973.49 850.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 45.00 750.00 755.38 728.63 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 97.00 200.00 1211.14 775.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 300.00 1100.00 1190.00 990.00 C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 53.00 725.00 780.00 1000.00 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 53.00 650.00 722.71 700.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 300.00 675.00 807.38 250.00 STA052A-045 SH 52B NEW RAYMER SOUTH 12/13/18 64.00 875.00 950.00 900.00 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 145.00 850.00 957.67 828.00 STAR100-279 FY20 HMA PREVENTATIVE MAINTEN 12/13/18 63.00 850.00 900.00 600.00 MTCE0253-267 MTCE R4 FY19 I25 CONCRETE PAN 12/13/18 30.00 900.00 1283.93 1000.00 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 60.00 800.00 640.00 630.00 MPR200-252 REGION 2 - PUEBLO COUNTY HIGH 12/20/18 120.00 500.00 341.67 275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,200.00 908.90 881.63 777.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10,741.00 849.49 802.77 762.01 =============== 630-00015 Uniformed Traf Ctrl Coordination Hour =================================================== STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 10.00 35.00 86.75 97.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 80.00 150.00 36.65 11.80 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 5.00 35.00 77.88 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 95.00 131.84 41.21 20.99 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 10.00 50.00 43.00 15.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 2.00 90.00 121.25 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.00 56.67 52.21 33.33 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 52.00 90.00 80.75 145.00 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 140.00 100.00 59.25 3.50 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 10.00 100.00 30.41 0.01 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 100.00 10.00 43.54 11.50 MTCE0253-267 MTCE R4 FY19 I25 CONCRETE PAN 12/13/18 35.00 40.00 11.48 10.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 337.00 65.52 48.47 28.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 444.00 79.47 45.99 26.90 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 579 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00017 Traffic Control Management (Special) Day ==================================================== STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 10.00 1000.00 1342.50 1150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 1000.00 1342.50 1150.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 1,619.00 996.96 996.96 996.96 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,619.00 996.96 996.96 996.96 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1,440.00 996.96 996.96 996.96 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,440.00 996.96 996.96 996.96 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,069.00 996.97 1001.42 997.46 =============== 630-00030 Courtesy Patrol Day ==================================================== C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 484.00 902.35 902.35 902.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 484.00 902.35 902.35 902.35 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 572.00 1217.78 1217.78 1217.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 572.00 1217.78 1217.78 1217.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,056.00 1073.21 1073.21 1073.21 =============== 630-00031 Courtesy Patrol Hour =================================================== NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 600.00 75.00 150.63 76.88 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 600.00 75.00 150.63 76.88 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 600.00 75.00 150.63 76.88 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 580 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00040 Develop Traf Incident Mgmt Plan LUMP SUM =============================================== NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 1.00 15000.00 15000.00 15000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 15000.00 15000.00 15000.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 1.00 5250.00 5250.00 5250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 5250.00 5250.00 5250.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 1.00 10000.00 18275.18 5125.54 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 1.00 2500.00 3110.67 8560.19 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 6250.00 9609.75 6842.87 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 8187.50 9724.25 8483.93 =============== 630-00041 Implement Traf Incident Mgmt Plan Month ================================================== NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 5.00 7000.00 15000.00 15000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 7000.00 15000.00 15000.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 36.00 1785.00 1785.00 1785.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 36.00 1785.00 1785.00 1785.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 8.00 2000.00 3086.82 4510.47 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 18.00 600.00 281.75 358.51 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 26.00 1030.77 983.02 1636.04 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 67.00 1881.49 1705.33 2713.39 =============== 630-80001 Flash Beacon (Port) Each =================================================== STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 2.00 650.00 845.45 800.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 581 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80001 Flash Beacon (Port) Each =================================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 2.00 800.00 197.23 200.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 4.00 1000.00 543.33 560.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 4.00 1000.00 393.75 210.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 12.00 800.00 652.40 600.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 12.00 950.00 1230.00 1200.00 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 6.00 1000.00 1085.20 1200.00 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 35.00 1000.00 480.25 150.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 24.00 818.00 676.34 944.30 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 22.00 750.00 796.56 544.57 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 20.00 750.00 310.56 65.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 8.00 700.00 2282.50 1360.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 4.00 1200.00 346.22 600.00 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 8.00 1200.00 1383.67 2145.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 163.00 883.63 772.45 647.32 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 3.00 1100.00 2189.40 2500.00 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 11.00 700.00 114.00 108.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 4.00 1000.00 746.80 442.20 FSA0711-020 SH 71 & SH 94: PUNKIN CENTER 05/03/18 4.00 1000.00 1800.00 1000.00 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 24.00 1100.00 286.67 275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 46.00 986.96 663.31 457.76 FBR060A-022 SH 60 over the South Platte 07/12/18 2.00 1300.00 1067.99 1500.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 4.00 570.00 627.43 556.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 6.00 1000.00 551.64 550.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 10.00 700.00 693.29 550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 22.00 812.73 685.87 637.45 NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 12.00 800.00 762.00 1100.00 BR1131-006 SH 113 AT MP 11.5 10/11/18 6.00 1000.00 1153.80 1111.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 8.00 660.00 938.39 1150.17 NHPP0702-366 I-70 Avon to Vail 11/08/18 23.00 1200.00 785.46 1200.00 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 12.00 850.00 584.93 1200.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 2.00 2000.00 891.70 1350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 63.00 994.92 838.59 1170.91 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 294.00 918.34 762.91 729.12 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 582 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80002 Flash Beacon (Solar) Each =================================================== STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 4.00 750.00 1178.57 535.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 750.00 1178.57 535.00 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 6.00 1000.00 749.74 489.31 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 10.00 725.00 931.78 850.00 FBR0705-087 I-70: EMERGENCY BRIDGE G-25-K 05/16/18 6.00 4100.00 4100.00 4100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 22.00 1720.45 1001.50 1637.99 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 33.00 795.46 795.46 795.46 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 12.00 725.00 924.80 920.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 45.00 776.67 898.93 828.67 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 34.00 1000.00 1163.59 925.00 STA052A-045 SH 52B NEW RAYMER SOUTH 12/13/18 3.00 500.00 750.00 475.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 8.00 795.46 795.46 795.46 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 45.00 930.30 1120.01 871.97 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 116.00 1014.34 1016.25 988.83 =============== 630-80335 Barricade (3 M-A) (Temp) Each =================================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 6.00 100.00 320.42 140.84 STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 4.00 250.00 230.00 200.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 5.00 180.00 55.67 60.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 14.00 300.00 131.36 120.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR MTCER100-296 MTCE R1 FY18 WEST SIGN REPLAC 01/11/18 2.00 175.00 105.25 10.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 15.00 175.00 149.25 182.00 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 6.00 300.00 525.02 125.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 8.00 170.50 83.12 94.43 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 6.00 300.00 347.14 326.75 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 583 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80335 Barricade (3 M-A) (Temp) Each =================================================== FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 4.00 300.00 218.09 326.00 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 3.00 125.00 256.25 230.00 ER144A-002 SH 144 East and West of Goodr 03/08/18 8.00 150.00 382.52 80.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 4.00 125.00 143.24 160.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 1.00 2000.00 178.00 156.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 6.00 150.00 132.50 230.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 92.00 226.24 228.90 159.25 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 16.00 185.00 142.50 125.00 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 4.00 130.00 190.00 180.00 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 3.00 150.00 85.00 81.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 4.00 180.00 195.99 93.50 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 7.00 180.00 169.35 180.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 4.00 120.00 62.90 51.58 FBR0705-087 I-70: EMERGENCY BRIDGE G-25-K 05/16/18 12.00 60.00 60.00 60.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 6.00 190.00 75.78 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 56.00 147.32 140.66 103.99 NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 8.00 170.00 250.00 250.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 4.00 200.00 100.83 125.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 30.00 138.65 138.65 138.65 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 2.00 175.00 199.98 230.00 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 3.00 150.00 138.50 27.00 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 4.00 350.00 141.25 141.00 C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 9.00 115.00 92.75 130.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 4.00 200.00 134.21 80.00 M850-027 US24E MANITOU AVE. AT RUXTON 08/28/18 6.00 200.00 206.87 140.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 10.00 145.00 106.25 110.00 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 8.00 200.00 242.50 80.00 STM0252-469 R2 ADA RAMPS I-25 INT S NEV- 09/06/18 16.00 170.00 116.50 113.00 NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 8.00 250.00 192.00 192.00 NHPP070A-032 I-70B & Z GRAND JCT PHASE 1 A 09/20/18 8.00 170.00 89.00 10.00 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 5.00 150.00 140.25 175.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 125.00 171.48 139.89 129.07 NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 13.00 150.00 81.00 140.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 584 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80335 Barricade (3 M-A) (Temp) Each =================================================== BR1131-006 SH 113 AT MP 11.5 10/11/18 4.00 250.00 201.04 222.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 20.00 150.00 253.86 130.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 6.00 170.00 206.78 450.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 16.00 200.00 110.83 100.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 18.00 157.50 156.95 156.95 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 2.00 200.00 96.14 63.87 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 10.00 250.00 159.26 125.00 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 12.00 225.00 83.00 66.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 5.00 200.00 99.49 100.00 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 20.00 120.00 95.31 65.00 C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 9.00 130.00 223.20 96.00 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 2.00 165.00 126.25 75.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 30.00 175.00 170.55 113.21 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 6.00 250.00 104.71 115.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 32.00 138.65 138.65 138.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 205.00 169.23 159.88 126.54 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 478.00 178.22 171.36 130.85 =============== 630-80336 Barricade (3 M-B) (Temp) Each =================================================== NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 3.00 200.00 191.50 105.00 ER1151-033 PR SH 115-MP 34.7 01/25/18 3.00 200.00 662.06 420.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 4.00 250.00 251.00 257.00 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 2.00 375.00 177.33 208.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12.00 245.83 311.92 251.58 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 4.00 200.00 134.82 239.33 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 4.00 500.00 225.00 225.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 350.00 143.02 232.17 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 2.00 190.00 174.64 139.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 8.00 500.00 147.28 80.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 6.00 251.00 184.33 225.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 16.00 367.88 169.32 141.75 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 585 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80336 Barricade (3 M-B) (Temp) Each =================================================== NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 4.00 260.00 151.11 209.12 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 12.00 200.00 115.65 135.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 4.00 250.00 286.18 550.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 10.00 230.00 99.49 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 30.00 224.67 135.24 188.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 66.00 278.42 179.63 193.95 =============== 630-80337 Barricade (3 M-C) (Temp) Each =================================================== FBR060A-022 SH 60 over the South Platte 07/12/18 7.00 150.00 146.37 100.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 4.00 300.00 198.98 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 11.00 204.55 154.79 92.73 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 204.55 154.79 92.73 =============== 630-80338 Barricade (3 M-D) (Temp) Each =================================================== ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 8.00 320.00 492.63 616.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 4.00 450.00 359.89 375.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12.00 363.33 448.38 535.67 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 2.00 365.00 213.89 185.00 FSA0711-020 SH 71 & SH 94: PUNKIN CENTER 05/03/18 4.00 600.00 326.67 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 521.67 275.40 395.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 15.00 210.00 368.84 110.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 18.00 365.00 462.11 510.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 33.00 294.55 421.91 328.18 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 586 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80338 Barricade (3 M-D) (Temp) Each =================================================== NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 24.00 175.00 32.07 31.50 STA086A-051 SH 86; WEST OF I-70 11/29/18 2.00 500.00 154.00 245.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 26.00 200.00 49.49 47.92 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 77.00 291.04 363.79 271.09 =============== 630-80340 Pedestrian Barricade (ADA) Lin Foot =============================================== NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 50.00 50.00 130.00 130.00 C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 300.00 30.00 18.85 8.40 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 400.00 100.00 41.25 25.00 STM0252-469 R2 ADA RAMPS I-25 INT S NEV- 09/06/18 250.00 50.00 10.00 10.00 NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 100.00 120.00 45.00 45.00 NHPP070A-032 I-70B & Z GRAND JCT PHASE 1 A 09/20/18 400.00 120.00 34.65 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,500.00 82.67 31.14 25.35 C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 300.00 30.00 26.40 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 300.00 30.00 26.40 8.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,800.00 73.89 29.90 22.46 =============== 630-80341 Const Traf Sign (A) Each =================================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 30.00 30.00 52.54 45.07 STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 14.00 35.00 50.32 8.00 STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 71.00 30.00 77.15 70.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 21.00 50.00 32.00 32.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 25.00 50.00 35.50 48.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 40.00 60.00 44.25 42.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 23.00 50.00 82.00 75.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR NHPP0702-373 I-70 GWC Longitudinal Joint R 01/11/18 10.00 40.00 108.00 66.00 ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 10.00 45.00 57.07 58.00 MTCER100-296 MTCE R1 FY18 WEST SIGN REPLAC 01/11/18 4.00 54.00 25.49 5.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 587 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80341 Const Traf Sign (A) Each =================================================== STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 84.00 50.00 65.25 79.00 MTCE0712-017 SH 71 CHIP SEAL MP 123 TO MP 01/18/18 66.00 25.00 40.00 30.00 STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 14.00 35.00 44.00 44.00 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 22.00 32.00 44.69 47.75 NHPP5502-088 US 550 RIVERSIDE SNOW SHED LI 01/25/18 14.00 30.00 59.77 60.86 ER1151-033 PR SH 115-MP 34.7 01/25/18 26.00 48.08 70.86 50.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 29.00 50.00 64.62 30.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 24.00 49.00 43.40 94.43 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 19.00 50.00 104.25 103.47 C0703-440 AVALANCHE CONTROL SYSTEM: EJM 02/01/18 10.00 55.00 48.67 70.00 STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 18.00 45.00 25.67 21.00 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 28.00 40.00 18.15 12.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 18.00 50.00 54.29 41.00 NHPP5502-096 US550 STRIPING & RUMBLE STRIP 03/01/18 43.00 25.00 22.75 21.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 170.00 50.00 60.22 47.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 64.00 60.00 45.08 85.00 NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 27.00 30.00 21.03 20.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 72.00 80.00 47.30 59.00 MTCER500-201 R5 FY18 SIGN REPLACEMENT 03/08/18 6.00 25.00 20.00 5.00 MTCER500-203 WITHIN CDOT'S R5 MAINTENANCE 03/08/18 22.00 50.00 31.50 30.00 NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 16.00 45.00 24.33 25.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 9.00 50.00 11.20 10.40 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 17.00 65.00 50.50 66.00 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 28.00 60.00 36.00 52.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,094.00 46.89 51.94 50.77 NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPL 04/05/18 17.00 55.00 19.67 36.00 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 25.00 50.00 54.30 62.50 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 7.00 50.00 26.82 53.18 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 8.00 65.00 45.67 60.00 STAR400-347 Various intersections across 04/12/18 24.00 50.00 57.67 100.00 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 16.00 55.00 22.84 22.00 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 31.00 50.00 34.00 33.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 40.00 55.00 31.29 38.50 STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 25.00 45.00 35.13 11.00 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 68.00 50.00 13.23 10.00 MTCE0701-246 MTCE R3 FY18 I-70 CENTERLINE 05/03/18 8.00 10.00 17.50 25.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 14.00 50.00 52.89 36.00 FSA0711-020 SH 71 & SH 94: PUNKIN CENTER 05/03/18 12.00 40.00 41.67 30.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 49.00 52.00 52.17 60.69 FBR0705-087 I-70: EMERGENCY BRIDGE G-25-K 05/16/18 45.00 41.00 41.00 41.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 588 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80341 Const Traf Sign (A) Each =================================================== MTCE R100-312 R1 CHIP SEAL 05/17/18 6.00 60.00 45.00 45.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 98.00 50.00 35.00 35.00 MTCER300-244 MTCE R3 FY 18/19 REGIONWIDE S 05/31/18 14.00 5.00 10.33 10.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 59.00 40.00 36.57 37.50 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 16.00 35.00 80.00 76.00 NHPP0761-230 I-76 AND COUNTY ROAD 22 AT FO 06/14/18 4.00 40.00 72.50 60.00 MPR200-251 R2 FY19 PAVEMENT MARKING 06/21/18 16.00 60.00 13.75 10.00 ER055A-001 PR SH 55 FLOOD REPAIR 2015 06/28/18 16.00 50.00 49.60 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 618.00 47.30 36.45 37.62 NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 84.00 60.00 125.00 125.00 FBR060A-022 SH 60 over the South Platte 07/12/18 49.00 40.00 28.20 10.00 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 12.00 25.00 43.87 23.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 24.00 6.00 29.97 22.00 SHE0701-245 I-70 MEDIAN CABLE RAIL INSTAL 07/12/18 12.00 60.00 25.00 25.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 14.00 55.00 71.00 65.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 16.00 30.00 27.12 22.35 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 200.00 42.42 42.42 42.42 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 13.00 33.00 57.08 37.00 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 8.00 55.00 48.50 27.00 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 32.00 55.00 37.50 41.00 C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 63.00 45.00 34.50 52.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 33.00 51.00 46.30 35.00 STA052A-040 SH 52: Antelope Creek 08/23/18 8.00 25.00 119.17 115.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 78.00 55.00 39.43 15.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 100.00 35.00 46.03 55.00 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 91.00 60.00 48.88 38.50 STM0252-469 R2 ADA RAMPS I-25 INT S NEV- 09/06/18 340.00 48.00 46.60 45.20 NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 84.00 70.00 30.00 30.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 180.00 55.00 56.17 56.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 20.00 35.00 23.50 45.00 NHPP070A-032 I-70B & Z GRAND JCT PHASE 1 A 09/20/18 84.00 70.00 24.65 10.00 STMR200-246 R2–2018 CRITICAL CULVERTS REP 09/20/18 10.00 55.00 35.00 35.00 MTCE0704-244 Crack Seal I-70 MP 328 TO MP 09/27/18 22.00 45.00 61.00 61.00 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 12.00 50.00 54.75 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,589.00 49.92 47.21 44.88 NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 14.00 50.00 46.00 70.00 BR1131-006 SH 113 AT MP 11.5 10/11/18 22.00 50.00 63.01 61.00 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 8.00 52.00 47.25 51.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 589 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80341 Const Traf Sign (A) Each =================================================== NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 42.00 50.00 30.00 30.00 SHER200-243 R2 WRONG WAY PREVENTION 10/18/18 8.00 50.00 22.50 25.00 SHE2254-092 SH225 AND 17TH PLACE IMPROVEM 10/18/18 4.00 50.77 57.00 11.00 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 20.00 50.00 33.21 10.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 46.00 51.00 29.12 31.37 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 67.00 45.00 68.63 75.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 120.00 60.00 134.14 65.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 96.00 62.00 64.39 55.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 203.00 40.00 21.28 21.00 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 39.00 35.00 28.50 35.00 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 42.00 85.00 75.33 160.00 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 12.00 50.00 42.79 30.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 39.00 40.00 16.67 15.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 4.00 40.00 111.31 118.00 ER052A-039 SH 170 11/15/18 2.00 40.00 50.51 74.00 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 30.00 30.00 50.00 50.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 28.00 10.50 81.19 81.19 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 13.00 45.00 43.59 40.64 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 131.00 50.00 38.88 50.00 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 37.00 65.00 45.50 36.00 C R500-198 R5 GUARDRAIL REPLACEMENT/UPGR 11/29/18 10.00 50.00 25.50 25.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 10.00 40.00 63.33 27.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 38.00 65.00 29.83 37.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 93.00 52.00 33.27 40.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 96.00 45.00 33.73 15.08 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 28.00 55.00 86.99 45.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 250.00 110.00 106.96 68.00 C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 63.00 40.00 59.75 43.75 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 68.00 45.00 12.79 8.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 295.00 60.00 76.31 96.23 STA052A-045 SH 52B NEW RAYMER SOUTH 12/13/18 56.00 75.00 72.50 90.50 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 72.00 65.00 58.33 65.00 STAR100-279 FY20 HMA PREVENTATIVE MAINTEN 12/13/18 6.00 65.00 40.66 55.00 MTCE0253-267 MTCE R4 FY19 I25 CONCRETE PAN 12/13/18 16.00 40.00 22.73 10.50 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 11.00 60.00 56.14 65.00 MPR200-252 REGION 2 - PUEBLO COUNTY HIGH 12/20/18 20.00 25.00 23.33 25.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 138.00 42.42 42.42 42.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,297.00 57.64 64.35 54.17 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,598.00 52.20 53.82 49.04 =============== 630-80342 Const Traf Sign (B) Each =================================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 27.00 60.00 52.54 45.07 STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 76.00 40.00 54.15 8.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 590 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80342 Const Traf Sign (B) Each =================================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 63.00 40.00 77.15 70.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 45.00 65.00 54.33 56.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 112.00 60.00 38.25 59.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 156.00 80.00 48.00 42.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 41.00 60.00 121.28 110.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR NHPP0702-373 I-70 GWC Longitudinal Joint R 01/11/18 24.00 50.00 111.00 72.00 ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 40.00 50.00 107.17 76.00 MTCER100-296 MTCE R1 FY18 WEST SIGN REPLAC 01/11/18 22.00 62.00 30.00 5.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 39.00 65.00 86.25 103.00 MTCE0712-017 SH 71 CHIP SEAL MP 123 TO MP 01/18/18 68.00 35.00 51.00 35.00 ITSSW01-833 ABOUT 1.5 MILES NORTH OF THE 01/18/18 24.00 65.00 31.50 65.00 STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 69.00 45.00 55.00 55.00 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 11.00 40.00 64.76 71.50 NHPP5502-088 US 550 RIVERSIDE SNOW SHED LI 01/25/18 10.00 35.00 62.93 60.90 ER1151-033 PR SH 115-MP 34.7 01/25/18 17.00 78.35 116.56 75.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 60.00 60.00 69.02 30.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 29.00 65.00 66.63 94.43 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 48.00 60.00 117.25 103.47 C0703-440 AVALANCHE CONTROL SYSTEM: EJM 02/01/18 27.00 65.00 100.17 176.00 STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 36.00 55.00 36.00 26.00 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 106.00 45.00 20.73 17.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 51.00 60.00 58.32 56.00 NHPP5502-096 US550 STRIPING & RUMBLE STRIP 03/01/18 14.00 30.00 28.25 21.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 90.00 60.00 69.88 62.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 42.00 75.00 49.28 95.00 NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 104.00 35.00 21.03 20.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 62.00 100.00 68.85 64.00 MTCER500-201 R5 FY18 SIGN REPLACEMENT 03/08/18 26.00 30.00 26.57 5.00 MTCER500-203 WITHIN CDOT'S R5 MAINTENANCE 03/08/18 69.00 50.00 31.50 30.00 NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 47.00 70.00 24.33 25.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 35.00 60.00 21.40 20.80 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 18.00 78.73 63.00 63.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 43.00 100.00 80.00 120.00 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 20.00 110.00 98.00 208.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,771.00 58.90 60.00 54.23 NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPL 04/05/18 16.00 85.00 50.33 48.00 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 84.00 50.00 155.65 23.25 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 28.00 60.00 27.22 57.27 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 54.00 110.00 69.00 80.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 591 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80342 Const Traf Sign (B) Each =================================================== STAR400-347 Various intersections across 04/12/18 16.00 60.00 138.00 200.00 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 28.00 62.00 32.67 32.00 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 27.00 60.00 57.00 54.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 10.00 65.00 31.91 38.50 STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 6.00 65.00 40.63 16.00 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 94.00 65.00 16.73 15.00 MTCE0701-246 MTCE R3 FY18 I-70 CENTERLINE 05/03/18 44.00 10.00 20.00 25.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 62.00 55.00 135.87 78.00 FSA0711-020 SH 71 & SH 94: PUNKIN CENTER 05/03/18 48.00 55.00 121.67 50.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 66.00 85.00 67.46 72.83 FBR0705-087 I-70: EMERGENCY BRIDGE G-25-K 05/16/18 69.00 52.00 52.00 52.00 MTCE R100-312 R1 CHIP SEAL 05/17/18 42.00 90.00 45.00 45.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 16.00 60.00 35.00 35.00 MTCER300-244 MTCE R3 FY 18/19 REGIONWIDE S 05/31/18 32.00 10.00 10.33 10.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 35.00 60.00 58.80 62.50 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 50.00 45.00 87.33 76.00 NHPP0761-230 I-76 AND COUNTY ROAD 22 AT FO 06/14/18 4.00 50.00 102.17 85.00 MPR200-251 R2 FY19 PAVEMENT MARKING 06/21/18 26.00 75.00 15.00 10.00 ER055A-001 PR SH 55 FLOOD REPAIR 2015 06/28/18 8.00 65.00 130.32 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 865.00 60.59 73.69 49.04 NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 24.00 75.00 175.00 175.00 FBR060A-022 SH 60 over the South Platte 07/12/18 22.00 45.00 75.43 100.00 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 30.00 30.00 48.75 34.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 10.00 12.00 35.69 33.00 SHE0701-245 I-70 MEDIAN CABLE RAIL INSTAL 07/12/18 20.00 70.00 35.00 35.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 38.00 80.00 99.00 115.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 56.00 40.00 30.45 22.35 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 200.00 79.55 79.55 79.55 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 36.00 50.60 63.83 43.00 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 56.00 95.00 187.50 120.00 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 72.00 65.00 48.50 52.00 C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 36.00 55.00 65.00 90.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 123.00 90.00 64.09 38.00 STA052A-040 SH 52: Antelope Creek 08/23/18 30.00 35.00 119.17 115.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 68.00 65.00 53.24 15.00 M850-027 US24E MANITOU AVE. AT RUXTON 08/28/18 30.00 50.00 90.12 23.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 40.00 55.00 63.26 80.00 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 33.00 100.00 94.50 45.00 STM0252-469 R2 ADA RAMPS I-25 INT S NEV- 09/06/18 90.00 62.00 46.60 45.20 NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 24.00 80.00 30.00 30.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 17.00 62.00 67.92 66.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 42.00 45.00 31.25 75.00 NHPP070A-032 I-70B & Z GRAND JCT PHASE 1 A 09/20/18 24.00 80.00 24.65 10.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 592 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80342 Const Traf Sign (B) Each =================================================== STMR200-246 R2–2018 CRITICAL CULVERTS REP 09/20/18 44.00 65.00 47.00 47.00 MTCE0704-244 Crack Seal I-70 MP 328 TO MP 09/27/18 38.00 55.00 226.00 226.00 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 30.00 55.00 112.00 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,233.00 67.08 70.81 66.47 NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 43.00 60.00 71.00 120.00 BR1131-006 SH 113 AT MP 11.5 10/11/18 23.00 65.00 159.59 227.00 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 52.00 69.00 61.50 62.00 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 141.00 60.00 35.00 35.00 SHER200-243 R2 WRONG WAY PREVENTION 10/18/18 30.00 60.00 22.50 25.00 SHE2254-092 SH225 AND 17TH PLACE IMPROVEM 10/18/18 10.00 54.23 65.50 16.50 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 68.00 60.00 38.46 20.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 129.00 55.00 38.61 41.82 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 22.00 55.00 76.23 95.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 29.00 50.00 161.71 110.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 141.00 72.00 85.64 60.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 96.00 50.00 26.55 26.25 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 132.00 45.00 30.00 35.00 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 130.00 90.00 157.83 390.00 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 36.00 65.00 51.35 30.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 28.00 50.00 16.67 15.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 38.00 50.00 118.94 118.00 ER052A-039 SH 170 11/15/18 20.00 50.00 66.45 101.00 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 27.00 50.00 50.00 50.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 84.00 10.50 81.19 81.19 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 39.00 60.00 55.49 52.26 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 16.00 60.00 58.34 60.00 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 114.00 100.00 126.50 48.00 C R500-198 R5 GUARDRAIL REPLACEMENT/UPGR 11/29/18 78.00 60.00 25.50 25.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 42.00 60.00 85.89 32.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 129.00 75.00 37.77 49.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 63.00 60.00 45.19 50.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 38.00 55.00 33.73 15.08 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 55.00 55.00 96.15 55.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 150.00 140.00 111.51 70.00 C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 36.00 50.00 84.90 76.50 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 40.00 55.00 12.79 8.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 26.00 50.00 140.65 135.86 STA052A-045 SH 52B NEW RAYMER SOUTH 12/13/18 106.00 90.00 81.33 101.00 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 116.00 100.00 107.33 137.00 STAR100-279 FY20 HMA PREVENTATIVE MAINTEN 12/13/18 42.00 110.00 118.29 205.00 MTCE0253-267 MTCE R4 FY19 I25 CONCRETE PAN 12/13/18 24.00 50.00 26.48 10.50 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 9.00 75.00 71.29 75.00 MPR200-252 REGION 2 - PUEBLO COUNTY HIGH 12/20/18 30.00 25.00 23.33 25.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 593 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80342 Const Traf Sign (B) Each =================================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 180.00 79.55 79.55 79.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,612.00 70.15 75.66 79.29 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,481.00 65.22 69.53 65.97 =============== 630-80343 Const Traf Sign (C) Each =================================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 68.00 50.00 77.15 70.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 9.00 75.00 54.33 56.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 8.00 100.00 49.25 42.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 14.00 70.00 121.28 110.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR MTCER100-296 MTCE R1 FY18 WEST SIGN REPLAC 01/11/18 4.00 72.00 32.25 5.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 22.00 75.00 109.25 127.00 ITSSW01-833 ABOUT 1.5 MILES NORTH OF THE 01/18/18 6.00 85.00 33.00 71.00 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 36.00 65.00 73.63 30.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 26.00 78.00 86.06 94.43 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 23.00 65.00 118.11 103.47 C0703-440 AVALANCHE CONTROL SYSTEM: EJM 02/01/18 10.00 75.00 115.17 176.00 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 20.00 50.00 20.73 17.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 22.00 65.00 60.15 60.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 30.00 70.00 92.72 98.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 8.00 120.00 58.73 105.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 16.00 125.00 81.37 75.00 MTCER500-203 WITHIN CDOT'S R5 MAINTENANCE 03/08/18 12.00 50.00 31.50 30.00 NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 4.00 80.00 24.33 25.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 9.00 100.00 102.50 160.00 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 19.00 110.00 104.33 208.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 366.00 71.90 82.09 83.46 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 6.00 75.00 38.26 79.78 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 10.00 105.00 71.00 85.00 STAR400-347 Various intersections across 04/12/18 8.00 70.00 121.67 140.00 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 18.00 67.00 43.49 43.00 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 10.00 70.00 85.50 81.00 MTCE0701-246 MTCE R3 FY18 I-70 CENTERLINE 05/03/18 8.00 10.00 22.50 25.00 FSA0711-020 SH 71 & SH 94: PUNKIN CENTER 05/03/18 8.00 70.00 126.67 60.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 4.00 80.00 78.27 94.06 FBR0705-087 I-70: EMERGENCY BRIDGE G-25-K 05/16/18 36.00 60.00 60.00 60.00 MTCE R100-312 R1 CHIP SEAL 05/17/18 4.00 72.06 45.00 45.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 594 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80343 Const Traf Sign (C) Each =================================================== MTCER300-244 MTCE R3 FY 18/19 REGIONWIDE S 05/31/18 8.00 10.00 10.33 10.00 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 8.00 55.00 101.33 96.00 MPR200-251 R2 FY19 PAVEMENT MARKING 06/21/18 8.00 100.00 16.25 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 136.00 63.93 56.54 61.45 SHE0701-245 I-70 MEDIAN CABLE RAIL INSTAL 07/12/18 28.00 80.00 45.00 45.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 12.00 75.00 110.17 150.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 60.00 25.00 32.12 22.35 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 75.00 124.25 124.25 124.25 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 8.00 66.00 71.33 43.00 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 20.00 100.00 187.50 120.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 8.00 80.00 64.09 38.00 STMR200-246 R2–2018 CRITICAL CULVERTS REP 09/20/18 10.00 75.00 47.00 47.00 MTCE0704-244 Crack Seal I-70 MP 328 TO MP 09/27/18 20.00 65.00 226.00 226.00 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 15.00 84.00 119.50 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 256.00 79.83 86.03 91.44 NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 10.00 75.00 91.00 160.00 BR1131-006 SH 113 AT MP 11.5 10/11/18 4.00 100.00 160.09 227.00 SHER200-243 R2 WRONG WAY PREVENTION 10/18/18 20.00 70.00 22.50 25.00 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 4.00 70.00 41.31 20.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 15.00 82.00 119.39 65.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 8.00 60.00 30.00 29.40 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 8.00 100.00 201.67 500.00 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 16.00 65.00 58.63 30.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 21.00 60.00 16.92 15.00 ER052A-039 SH 170 11/15/18 4.00 65.00 72.19 106.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 12.00 10.50 81.19 81.19 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 10.00 110.00 126.50 48.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 5.00 60.00 47.69 50.00 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 4.00 55.00 109.47 75.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 19.00 145.00 111.53 70.00 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 8.00 110.00 101.33 119.00 STAR100-279 FY20 HMA PREVENTATIVE MAINTEN 12/13/18 4.00 120.00 120.92 205.00 MTCE0253-267 MTCE R4 FY19 I25 CONCRETE PAN 12/13/18 28.00 80.00 30.23 10.50 MPR200-252 REGION 2 - PUEBLO COUNTY HIGH 12/20/18 20.00 25.00 23.33 25.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 106.00 122.75 122.75 122.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 326.00 90.53 74.16 87.21 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,084.00 78.38 77.84 83.71 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 595 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80344 Const Traf Sign (Spec) Sq Foot ================================================ STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 114.00 40.00 25.48 25.00 NHPP0702-373 I-70 GWC Longitudinal Joint R 01/11/18 16.00 20.00 24.25 23.50 STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 608.00 25.00 20.00 20.00 NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 54.00 22.00 21.03 20.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 252.00 25.00 22.26 21.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 101.00 40.00 33.10 31.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,145.00 27.61 22.67 21.75 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 54.00 23.00 11.84 19.15 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 300.00 23.00 5.67 5.30 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 201.00 40.00 18.00 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 555.00 29.16 8.26 11.25 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 100.00 20.00 19.83 20.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 450.00 18.56 18.56 18.56 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 91.00 17.00 13.66 14.00 STA052A-040 SH 52: Antelope Creek 08/23/18 64.00 50.00 59.42 57.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 64.00 22.00 20.03 14.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 110.00 23.00 13.84 12.00 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 64.00 22.00 22.25 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 943.00 21.68 20.41 19.90 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 96.00 25.00 19.29 19.87 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 430.00 20.00 29.67 21.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 576.00 20.00 21.28 21.00 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 54.00 20.00 15.00 10.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 50.00 55.00 53.16 59.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 300.00 21.00 21.65 21.65 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 29.00 30.00 20.50 21.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 1,225.00 25.00 18.87 23.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 64.00 30.00 32.72 12.06 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 221.00 50.00 34.94 29.00 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 32.00 30.00 11.43 10.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 351.00 25.00 19.73 16.98 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 596 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80344 Const Traf Sign (Spec) Sq Foot ================================================ NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 200.00 18.56 18.56 18.56 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,628.00 24.96 23.14 21.77 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,271.00 25.32 21.34 20.55 =============== 630-80348 Const Info Sign Each =================================================== STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 4.00 200.00 104.90 120.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 2.00 250.00 311.00 217.83 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 2.00 250.00 281.39 385.00 NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 2.00 140.00 238.33 235.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 208.00 205.84 215.57 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 6.00 250.00 80.61 41.82 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 250.00 80.61 41.82 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 223.75 174.53 150.41 =============== 630-80350 Vert Panel Each =================================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 50.00 50.00 25.32 5.63 NHPP0702-373 I-70 GWC Longitudinal Joint R 01/11/18 10.00 55.00 24.00 18.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 50.00 36.00 22.32 35.41 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 25.00 32.00 49.11 54.46 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 25.00 32.00 30.40 1.45 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 100.00 28.00 18.59 16.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 25.00 40.00 41.59 42.00 MTCER500-201 R5 FY18 SIGN REPLACEMENT 03/08/18 20.00 25.00 8.86 10.00 MTCER500-203 WITHIN CDOT'S R5 MAINTENANCE 03/08/18 50.00 10.00 11.00 11.00 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 80.00 33.00 39.33 26.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 435.00 31.93 25.86 20.94 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 230.00 30.00 15.84 10.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 597 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80350 Vert Panel Each =================================================== ER055A-001 PR SH 55 FLOOD REPAIR 2015 06/28/18 20.00 30.00 35.14 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 250.00 30.00 19.57 11.60 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 50.00 25.00 17.45 25.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 25.00 35.00 44.26 26.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 100.00 30.00 10.70 10.50 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 50.00 30.00 40.36 45.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 10.00 25.00 110.25 118.00 ER052A-039 SH 170 11/15/18 10.00 25.00 23.43 27.00 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 75.00 40.00 29.50 24.00 C R500-198 R5 GUARDRAIL REPLACEMENT/UPGR 11/29/18 20.00 45.00 19.00 25.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 30.00 30.00 24.31 25.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 50.00 30.00 30.03 39.62 STA052A-045 SH 52B NEW RAYMER SOUTH 12/13/18 50.00 35.00 33.83 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 470.00 32.29 30.65 28.04 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,155.00 31.66 26.06 21.81 =============== 630-80355 Port Mesg Panel Each =================================================== STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 2.00 5500.00 6038.74 8000.00 STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 5.00 5000.00 4125.00 5000.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 2.00 5000.00 7078.76 6450.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 5.00 5500.00 6024.00 5500.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR MTCER100-296 MTCE R1 FY18 WEST SIGN REPLAC 01/11/18 4.00 5200.00 2169.00 1500.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 4.00 4000.00 5837.50 6100.00 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 2.00 7000.00 5925.68 6600.00 NHPP5502-088 US 550 RIVERSIDE SNOW SHED LI 01/25/18 2.00 4000.00 2531.69 2434.50 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 3.00 5250.00 5540.57 4500.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 2.00 5800.00 4267.82 7082.28 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 2.00 5250.00 6397.07 4901.19 STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 2.00 5400.00 4925.00 4125.00 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 3.00 5000.00 2913.04 5000.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 2.00 5250.00 3519.25 4000.00 NHPP5502-096 US550 STRIPING & RUMBLE STRIP 03/01/18 2.00 1200.00 2037.50 950.00 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 2.00 5000.00 2725.00 3300.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 10.00 6000.00 6899.00 5642.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 2.00 4000.00 4516.53 6000.00 NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 4.00 5000.00 1051.41 1000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 598 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80355 Port Mesg Panel Each =================================================== STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 2.00 3000.00 6779.85 4820.00 MTCER500-201 R5 FY18 SIGN REPLACEMENT 03/08/18 2.00 1150.00 2557.86 1500.00 FSAR200-247 US 287 FROM MP 0.00 (STATE LI 03/08/18 2.00 2100.00 3175.00 2450.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 2.00 5000.00 6860.00 5720.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 2.00 5250.00 5700.00 8900.00 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 2.00 5000.00 5048.88 4436.64 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 72.00 4859.03 5022.83 4654.99 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 2.00 5500.00 8142.44 6382.26 STAR400-347 Various intersections across 04/12/18 4.00 3500.00 2713.33 500.00 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 2.00 5600.00 4588.80 4300.00 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 2.00 5000.00 4950.00 4400.00 STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 2.00 1300.00 1297.50 1050.00 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 2.00 5700.00 5653.46 6500.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 3.00 2500.00 8149.54 9000.00 FSA0711-020 SH 71 & SH 94: PUNKIN CENTER 05/03/18 4.00 4000.00 2433.33 2000.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 6.00 4500.00 6621.67 4386.67 FBR0705-087 I-70: EMERGENCY BRIDGE G-25-K 05/16/18 4.00 2500.00 2500.00 2500.00 MTCE R100-312 R1 CHIP SEAL 05/17/18 4.00 5500.00 1800.00 1800.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 4.00 2500.00 2500.00 2500.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 6.00 1500.00 1286.11 1250.00 ER055A-001 PR SH 55 FLOOD REPAIR 2015 06/28/18 2.00 4000.00 7472.30 7800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 47.00 3610.64 5156.29 3380.52 NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 3.00 10000.00 2500.00 2500.00 FBR060A-022 SH 60 over the South Platte 07/12/18 2.00 4500.00 5583.14 5500.00 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 2.00 5000.00 4588.50 2820.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 2.00 2000.00 2953.57 2775.00 SHE0701-245 I-70 MEDIAN CABLE RAIL INSTAL 07/12/18 2.00 7000.00 3750.00 3750.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 4.00 4250.00 5166.67 8900.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 2.00 1100.00 3931.27 2793.80 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 8.00 9015.15 9015.15 9015.15 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 4.00 5500.00 4950.00 2500.00 C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 2.00 4000.00 3248.25 3355.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 6.00 3270.00 7233.88 5000.00 STA052A-040 SH 52: Antelope Creek 08/23/18 2.00 3500.00 599.17 600.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 8.00 5500.00 6176.19 12000.00 M850-027 US24E MANITOU AVE. AT RUXTON 08/28/18 4.00 5000.00 3043.67 2300.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 2.00 5000.00 8802.11 6400.00 STM0252-469 R2 ADA RAMPS I-25 INT S NEV- 09/06/18 12.00 5500.00 5242.50 5085.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 599 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80355 Port Mesg Panel Each =================================================== NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 3.00 5000.00 4480.00 4480.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 5.00 5600.00 9005.45 8670.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 2.00 3250.00 1818.25 5500.00 NHPP070A-032 I-70B & Z GRAND JCT PHASE 1 A 09/20/18 3.00 5000.00 2315.00 700.00 MTCE0704-244 Crack Seal I-70 MP 328 TO MP 09/27/18 2.00 3600.00 1100.00 1100.00 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 2.00 4600.00 3401.75 2750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 82.00 5315.14 5827.80 5549.01 BR1131-006 SH 113 AT MP 11.5 10/11/18 2.00 4000.00 4700.90 3333.00 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 2.00 5500.00 5451.48 3500.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 4.00 5000.00 11448.26 13864.79 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 4.00 4000.00 4256.65 5050.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 3.00 3300.00 7661.43 9000.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 4.00 4500.00 8562.77 6500.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 4.00 4500.00 9501.75 9371.25 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 5.00 5000.00 5000.00 3000.00 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 8.00 9000.00 5955.00 5750.00 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 2.00 5000.00 7090.00 5000.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 4.00 4500.00 1125.00 1000.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 2.00 3500.00 4484.00 4130.00 ER052A-039 SH 170 11/15/18 2.00 3500.00 2868.42 2050.00 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 2.00 5500.00 4500.00 4500.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 5.00 2625.00 1623.71 1623.71 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 2.00 5000.00 4748.69 4354.75 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 4.00 4000.00 3237.28 2835.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 2.00 4500.00 7146.26 15000.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 4.00 1200.00 3555.86 2500.00 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 4.00 4000.00 4987.61 4000.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 8.00 13000.00 9724.35 9300.00 C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 2.00 4000.00 5364.00 3120.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 5.00 10000.00 12936.73 7924.93 STA052A-045 SH 52B NEW RAYMER SOUTH 12/13/18 3.00 4000.00 4846.67 3540.00 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 2.00 6000.00 7012.00 2136.00 STAR100-279 FY20 HMA PREVENTATIVE MAINTEN 12/13/18 8.00 7000.00 2671.00 2500.00 MTCE0253-267 MTCE R4 FY19 I25 CONCRETE PAN 12/13/18 2.00 3500.00 837.20 530.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 11.00 9015.15 9015.15 9015.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 110.00 6072.65 5928.53 5597.47 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 311.00 5219.88 5546.92 5031.46 =============== 630-80356 Flash Arrow Panel (A Ty) Each =================================================== NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPL 04/05/18 1.00 600.00 1888.00 4759.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 600.00 1888.00 4759.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 600 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80356 Flash Arrow Panel (A Ty) Each =================================================== STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 2.00 800.00 587.50 250.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 2.00 1400.00 3868.32 2264.27 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 2.00 1600.00 1693.33 830.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 1266.67 2231.58 1114.76 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 1171.43 2186.76 1635.36 =============== 630-80357 Flash Arrow Panel (B Ty) Each =================================================== SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 2.00 1450.00 440.00 460.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 2.00 2000.00 1788.20 800.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR NHPP5502-088 US 550 RIVERSIDE SNOW SHED LI 01/25/18 2.00 500.00 669.89 608.50 ER1151-033 PR SH 115-MP 34.7 01/25/18 1.00 1000.00 2059.45 125.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 NHPP5502-096 US550 STRIPING & RUMBLE STRIP 03/01/18 2.00 500.00 721.25 685.00 NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 1.00 700.00 262.85 250.00 MTCER500-201 R5 FY18 SIGN REPLACEMENT 03/08/18 1.00 500.00 483.43 300.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 2.00 1500.00 1175.00 1600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 13.00 1084.62 950.27 690.92 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 8.00 1000.00 2368.40 2250.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 3.00 1000.00 1708.80 600.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 4.00 300.00 800.00 800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 15.00 813.33 2075.72 1533.33 NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 3.00 2200.00 1000.00 1000.00 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 3.00 1500.00 864.50 881.00 C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 6.00 900.00 900.00 820.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 2.00 1000.00 710.91 550.00 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 6.00 1200.00 931.25 1000.00 STM0252-469 R2 ADA RAMPS I-25 INT S NEV- 09/06/18 12.00 1165.00 1190.00 1130.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 601 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80357 Flash Arrow Panel (B Ty) Each =================================================== NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 3.00 1000.00 960.00 960.00 NHPP070A-032 I-70B & Z GRAND JCT PHASE 1 A 09/20/18 3.00 1000.00 2075.00 220.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 38.00 1202.11 1002.23 914.82 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 4.00 500.00 1375.00 750.00 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 2.00 2000.00 2000.00 2000.00 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 2.00 2000.00 1595.40 1451.59 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 4.00 1250.00 975.00 700.00 C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 6.00 1000.00 1438.00 940.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 18.00 1166.67 1405.41 1019.07 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 84.00 1106.90 1309.63 1012.95 =============== 630-80358 Flash Arrow Panel (C Ty) Each =================================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 2.00 2000.00 1975.00 2000.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 1.00 1500.00 1566.59 1600.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 2.00 1000.00 1725.00 2000.00 NHPP0702-373 I-70 GWC Longitudinal Joint R 01/11/18 1.00 2000.00 2100.00 1200.00 ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 2.00 2500.00 1235.27 1200.00 MTCER100-296 MTCE R1 FY18 WEST SIGN REPLAC 01/11/18 2.00 1500.00 932.00 250.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 1.00 1500.00 1177.50 970.00 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 1.00 1250.00 375.24 120.00 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 3.00 3000.00 2119.88 3500.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 2.00 1700.00 978.36 1298.42 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 2.00 3000.00 3753.51 3812.03 C0703-440 AVALANCHE CONTROL SYSTEM: EJM 02/01/18 2.00 1000.00 505.48 655.00 STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 2.00 2000.00 905.00 875.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 2.00 3000.00 1680.79 2100.00 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 2.00 1500.00 792.50 600.00 NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 2.00 500.00 651.67 650.00 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 2.00 1500.00 1687.33 1560.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 31.00 1859.68 1510.42 1561.00 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 2.00 1250.00 887.10 850.97 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 4.00 1500.00 500.33 100.00 STAR400-347 Various intersections across 04/12/18 2.00 1500.00 1076.67 1000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 602 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80358 Flash Arrow Panel (C Ty) Each =================================================== FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 2.00 1500.00 376.80 212.00 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 1.00 1500.00 2300.00 2200.00 STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 1.00 1300.00 747.50 735.00 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 2.00 1200.00 1654.58 1550.00 MTCE0701-246 MTCE R3 FY18 I-70 CENTERLINE 05/03/18 2.00 200.00 206.25 150.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 4.00 1600.00 1189.64 758.57 MTCE R100-312 R1 CHIP SEAL 05/17/18 1.00 1500.00 500.00 500.00 MTCER300-244 MTCE R3 FY 18/19 REGIONWIDE S 05/31/18 2.00 400.00 335.00 500.00 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 4.00 3000.00 580.00 550.00 MPR200-251 R2 FY19 PAVEMENT MARKING 06/21/18 2.00 2000.00 531.25 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 29.00 1544.83 789.42 613.63 SHE0701-245 I-70 MEDIAN CABLE RAIL INSTAL 07/12/18 2.00 900.00 2750.00 2750.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 2.00 2000.00 1241.67 1650.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 2.00 900.00 1491.97 1675.90 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 8.00 2068.19 2068.19 2068.19 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 1.00 1500.00 5521.34 1450.00 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 2.00 1500.00 1325.00 750.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 1.00 1500.00 1647.75 1500.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 2.00 1500.00 368.50 200.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 2.00 1750.00 227.50 550.00 MTCE0704-244 Crack Seal I-70 MP 328 TO MP 09/27/18 2.00 1500.00 550.00 550.00 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 4.00 1500.00 968.50 550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 28.00 1630.20 1209.05 1355.26 NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 3.00 1800.00 462.00 500.00 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 2.00 1500.00 1488.46 1250.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 4.00 1600.00 2867.62 3412.87 NHPP0702-366 I-70 Avon to Vail 11/08/18 2.00 2500.00 3269.93 2500.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 2.00 1750.00 2455.83 2425.50 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 5.00 3000.00 2591.67 3900.00 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 2.00 1500.00 988.38 600.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 1.00 2000.00 561.00 500.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 2.00 1000.00 1257.15 2000.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 4.00 700.00 950.79 550.00 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 10.00 750.00 786.45 1000.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 8.00 1800.00 2929.94 2300.00 STAR100-279 FY20 HMA PREVENTATIVE MAINTEN 12/13/18 1.00 1650.00 1192.50 1500.00 MTCE0253-267 MTCE R4 FY19 I25 CONCRETE PAN 12/13/18 2.00 1200.00 687.20 530.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 8.00 2068.19 2068.19 2068.19 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 56.00 1617.78 1664.67 1828.71 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 144.00 1657.58 1366.97 1434.32 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 603 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80359 Port Mesg Panel Day ==================================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 114.00 65.00 55.04 45.07 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 30.00 250.00 81.00 85.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 302.00 60.00 73.25 90.00 NHPP0702-373 I-70 GWC Longitudinal Joint R 01/11/18 94.00 125.00 97.50 85.00 STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 130.00 60.00 90.00 90.00 ER144A-002 SH 144 East and West of Goodr 03/08/18 7.00 100.00 157.17 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 677.00 78.70 78.03 82.66 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 28.00 75.00 92.45 93.75 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 60.00 85.00 52.67 40.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 350.00 60.00 35.10 38.50 MTCER300-244 MTCE R3 FY 18/19 REGIONWIDE S 05/31/18 150.00 40.00 40.67 30.00 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 280.00 120.00 100.00 95.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 868.00 78.11 50.57 57.14 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 17.00 53.04 53.04 53.04 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 42.00 75.00 161.99 160.00 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 240.00 100.00 33.23 32.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 299.00 93.82 66.26 51.58 NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 120.00 85.00 66.00 110.00 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 180.00 100.00 45.00 45.00 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 360.00 70.00 60.34 60.00 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 40.00 80.00 49.00 48.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 65.00 100.00 78.32 40.20 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 100.00 70.00 54.46 52.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 4.00 53.04 53.04 53.04 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 869.00 80.91 59.21 60.81 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,713.00 80.89 59.47 64.07 =============== 630-80360 Drum Channel Dev Each =================================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 50.00 30.00 22.82 5.63 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 604 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80360 Drum Channel Dev Each =================================================== STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 100.00 20.00 15.02 11.00 STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 200.00 30.00 45.93 40.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 100.00 35.00 28.00 30.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 100.00 35.00 19.67 16.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 100.00 30.00 27.88 31.50 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 225.00 33.40 43.72 40.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 50.00 25.00 54.53 47.00 MTCER100-296 MTCE R1 FY18 WEST SIGN REPLAC 01/11/18 40.00 35.00 19.50 1.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 105.00 40.00 43.13 42.50 CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 40.00 49.12 40.00 40.00 ITSSW01-833 ABOUT 1.5 MILES NORTH OF THE 01/18/18 10.00 60.00 22.75 30.00 STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 20.00 30.00 22.00 22.00 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 30.00 32.00 43.35 47.75 NHPP5502-088 US 550 RIVERSIDE SNOW SHED LI 01/25/18 20.00 20.00 19.44 6.10 ER1151-033 PR SH 115-MP 34.7 01/25/18 30.00 31.00 55.85 60.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 50.00 35.00 21.02 15.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 100.00 35.00 26.12 35.41 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 50.00 35.00 48.71 54.46 STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 100.00 40.00 6.33 6.00 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 115.00 25.00 15.40 11.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 50.00 35.00 31.34 1.00 NHPP5502-096 US550 STRIPING & RUMBLE STRIP 03/01/18 20.00 20.00 12.19 2.15 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 50.00 35.00 49.63 27.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 100.00 35.00 28.09 36.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 20.00 45.00 91.63 40.00 NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 80.00 15.00 2.10 2.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 10.00 50.00 41.85 37.50 NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 20.00 75.00 24.33 25.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 50.00 20.00 21.40 20.80 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 35.00 32.80 27.00 27.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 150.00 25.00 32.00 44.00 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 40.00 35.00 42.00 52.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,260.00 31.86 32.60 28.81 NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPL 04/05/18 25.00 30.00 23.00 24.00 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 115.00 25.00 43.75 56.25 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 100.00 35.00 46.67 50.00 STAR400-347 Various intersections across 04/12/18 20.00 50.00 36.33 50.00 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 75.00 35.00 12.02 11.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 50.00 38.00 23.62 18.70 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 605 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80360 Drum Channel Dev Each =================================================== STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 25.00 40.00 20.04 11.00 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 100.00 27.00 16.59 10.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 122.00 23.00 49.35 54.00 FSA0711-020 SH 71 & SH 94: PUNKIN CENTER 05/03/18 100.00 40.00 36.67 25.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 100.00 30.00 20.73 21.92 FBR0705-087 I-70: EMERGENCY BRIDGE G-25-K 05/16/18 25.00 25.00 25.00 25.00 MTCE R100-312 R1 CHIP SEAL 05/17/18 100.00 35.00 37.50 37.50 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 50.00 20.00 18.00 18.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 15.00 40.00 37.59 20.00 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 234.00 26.00 40.00 38.00 MPR200-251 R2 FY19 PAVEMENT MARKING 06/21/18 120.00 40.00 16.25 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,376.00 31.08 32.02 30.85 FBR060A-022 SH 60 over the South Platte 07/12/18 100.00 30.00 16.08 10.00 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 20.00 25.00 26.29 23.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 35.00 40.00 16.67 17.00 SHE0701-245 I-70 MEDIAN CABLE RAIL INSTAL 07/12/18 184.00 25.00 17.50 17.50 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 62.00 35.00 47.17 44.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 20.00 50.00 26.18 33.55 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 665.00 37.12 37.12 37.12 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 150.00 63.00 53.16 37.00 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 200.00 38.00 49.50 37.00 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 50.00 30.00 21.50 26.00 C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 200.00 40.00 29.38 25.50 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 100.00 15.00 34.06 27.00 STA052A-040 SH 52: Antelope Creek 08/23/18 20.00 40.00 52.83 54.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 155.00 35.00 25.67 12.00 M850-027 US24E MANITOU AVE. AT RUXTON 08/28/18 30.00 20.00 34.69 23.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 25.00 35.00 47.46 55.00 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 200.00 37.00 37.00 25.00 STM0252-469 R2 ADA RAMPS I-25 INT S NEV- 09/06/18 600.00 31.00 29.13 28.25 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 50.00 35.00 34.61 41.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 55.00 35.00 17.00 29.00 STMR200-246 R2–2018 CRITICAL CULVERTS REP 09/20/18 100.00 20.00 29.00 29.00 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 30.00 30.00 28.50 29.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,051.00 34.64 32.07 29.43 NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 30.00 30.00 38.50 45.00 BR1131-006 SH 113 AT MP 11.5 10/11/18 50.00 40.00 45.43 55.56 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 100.00 25.00 10.00 10.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 606 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80360 Drum Channel Dev Each =================================================== SHER200-243 R2 WRONG WAY PREVENTION 10/18/18 10.00 10.00 12.50 10.00 SHE2254-092 SH225 AND 17TH PLACE IMPROVEM 10/18/18 50.00 28.81 21.25 5.75 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 50.00 30.00 36.96 25.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 160.00 30.00 24.79 31.37 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 200.00 40.00 37.45 41.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 50.00 40.00 41.60 44.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 250.00 35.00 13.18 15.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 324.00 45.00 10.70 10.50 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 200.00 15.00 21.00 25.00 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 350.00 50.00 38.25 75.75 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 100.00 25.00 37.24 20.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 100.00 35.00 17.00 15.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 20.00 35.00 103.06 118.00 ER052A-039 SH 170 11/15/18 40.00 30.00 21.28 20.00 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 200.00 35.00 50.00 50.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 300.00 31.50 32.48 32.48 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 100.00 32.00 30.41 29.03 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 10.00 34.00 35.03 60.00 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 120.00 65.00 41.00 12.00 C R500-198 R5 GUARDRAIL REPLACEMENT/UPGR 11/29/18 25.00 40.00 16.50 20.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 40.00 35.00 28.49 11.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 30.00 55.00 23.80 37.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 1,420.00 25.00 23.06 25.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 50.00 35.00 17.02 10.05 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 200.00 30.00 34.63 25.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 600.00 25.00 43.60 34.00 C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 200.00 35.00 33.30 21.50 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 42.00 35.00 8.42 5.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 250.00 40.00 50.90 52.08 STA052A-045 SH 52B NEW RAYMER SOUTH 12/13/18 175.00 40.00 37.33 35.00 STAR100-279 FY20 HMA PREVENTATIVE MAINTEN 12/13/18 100.00 36.00 23.00 25.00 MTCE0253-267 MTCE R4 FY19 I25 CONCRETE PAN 12/13/18 135.00 40.00 14.10 11.00 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 20.00 50.00 44.00 50.00 MPR200-252 REGION 2 - PUEBLO COUNTY HIGH 12/20/18 10.00 10.00 18.33 15.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 950.00 37.12 37.12 37.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 7,061.00 33.41 30.55 31.11 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13,748.00 33.19 31.42 30.33 =============== 630-80363 Drum Channel Dev (Light) (F) Each =================================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 20.00 50.00 36.59 28.17 STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 20.00 35.00 45.93 40.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 10.00 40.00 35.33 16.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 20.00 35.00 29.38 31.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 607 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80363 Drum Channel Dev (Light) (F) Each =================================================== ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 10.00 49.10 108.20 100.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 5.00 35.00 45.00 45.00 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 10.00 40.00 57.04 59.50 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 55.00 40.00 21.02 15.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 45.00 40.00 55.00 54.46 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 10.00 70.00 33.11 40.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 40.00 40.00 31.49 1.75 NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 20.00 25.00 5.26 5.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 10.00 50.00 45.79 37.00 NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 2.00 60.00 24.33 25.00 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 18.00 65.61 55.00 55.00 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 35.00 48.00 51.73 57.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 330.00 42.87 40.10 34.03 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 8.00 50.00 45.00 50.00 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 50.00 45.00 18.33 16.00 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 212.00 40.00 34.00 33.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 10.00 50.00 41.70 40.70 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 77.00 28.00 45.50 43.50 ER055A-001 PR SH 55 FLOOD REPAIR 2015 06/28/18 20.00 45.00 57.63 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 377.00 38.95 37.92 33.30 SHE0701-245 I-70 MEDIAN CABLE RAIL INSTAL 07/12/18 4.00 35.00 85.00 85.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 20.00 35.00 26.18 33.55 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 80.00 66.29 66.29 66.29 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 6.00 95.00 56.45 43.00 C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 6.00 50.00 75.50 169.00 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 8.00 50.00 62.88 27.50 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 25.00 45.00 43.34 51.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 149.00 57.30 48.72 60.95 NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 60.00 40.00 46.00 60.00 BR1131-006 SH 113 AT MP 11.5 10/11/18 6.00 45.00 53.12 61.00 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 10.00 30.00 15.00 15.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 25.00 45.00 88.71 87.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 608 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80363 Drum Channel Dev (Light) (F) Each =================================================== NHPP0702-366 I-70 Avon to Vail 11/08/18 50.00 40.00 16.68 20.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 6.00 50.00 13.87 13.65 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 40.00 20.00 35.50 45.00 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 50.00 70.00 43.33 85.00 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 20.00 48.00 75.00 75.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 50.00 31.50 32.48 32.48 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 75.00 47.00 41.64 70.00 C R500-198 R5 GUARDRAIL REPLACEMENT/UPGR 11/29/18 9.00 50.00 38.00 50.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 10.00 40.00 27.20 20.10 C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 6.00 50.00 64.40 74.00 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 10.00 42.00 15.50 6.00 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 10.00 43.00 40.00 41.00 MTCE0253-267 MTCE R4 FY19 I25 CONCRETE PAN 12/13/18 35.00 45.00 20.23 10.50 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 90.00 66.29 66.29 66.29 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 562.00 46.79 42.84 52.84 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,418.00 44.90 41.37 44.12 =============== 630-80364 Drum Channel Dev (Light) (SB) Each =================================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 40.00 35.00 45.93 40.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 50.00 50.00 44.00 46.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 25.00 40.00 35.33 16.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 20.00 35.00 29.38 31.50 STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 5.00 35.00 45.00 45.00 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 45.00 40.00 21.02 15.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 15.00 40.00 167.71 54.46 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 65.00 40.00 32.52 1.75 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 50.00 50.00 41.38 47.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 20.00 55.00 112.61 90.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 20.00 25.00 41.80 41.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 355.00 41.90 52.65 33.08 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 17.00 35.00 26.87 53.18 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 80.00 22.00 22.84 20.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 25.00 35.00 25.00 25.00 MPR200-251 R2 FY19 PAVEMENT MARKING 06/21/18 120.00 50.00 21.25 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 242.00 38.14 22.82 15.41 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 10.00 35.00 26.25 33.75 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 609 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80364 Drum Channel Dev (Light) (SB) Each =================================================== BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 10.00 60.00 46.10 35.00 STM0252-469 R2 ADA RAMPS I-25 INT S NEV- 09/06/18 60.00 43.00 34.95 33.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 80.00 44.13 38.36 34.02 NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 60.00 40.00 46.00 60.00 BR1131-006 SH 113 AT MP 11.5 10/11/18 10.00 45.00 53.12 61.00 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 25.00 30.00 15.00 15.00 SHER200-243 R2 WRONG WAY PREVENTION 10/18/18 10.00 15.00 12.50 10.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 20.00 36.00 28.20 36.60 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 50.00 45.00 65.65 112.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 250.00 40.00 16.68 20.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 24.00 55.00 14.93 14.70 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 50.00 70.00 46.00 85.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 20.00 31.50 32.48 32.48 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 40.00 55.00 45.50 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 559.00 43.60 30.63 39.19 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,236.00 42.08 37.16 32.45 =============== 630-80367 Port Traf Speed Monitor Each =================================================== NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 4.00 1500.00 1200.00 950.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 2.00 1400.00 2775.00 2200.00 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 4.00 3250.00 1732.48 3000.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 2.00 3150.00 4198.47 2360.76 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 2.00 3250.00 3972.08 3812.03 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 2.00 3250.00 1762.59 2200.00 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 1.00 1500.00 2261.00 2080.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 17.00 2505.88 2527.60 2295.62 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 2.00 2500.00 2517.08 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 2500.00 2517.08 3000.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 2.00 2810.61 2810.61 2810.61 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 610 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80367 Port Traf Speed Monitor Each =================================================== MTCE0704-244 Crack Seal I-70 MP 328 TO MP 09/27/18 1.00 5500.00 1100.00 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 3707.07 2240.41 2240.41 BR1131-006 SH 113 AT MP 11.5 10/11/18 2.00 4000.00 1818.30 1111.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 2.00 2500.00 2811.76 3000.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 2.00 3465.00 561.00 500.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 2.00 2808.75 1082.48 1082.48 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 4.00 2500.00 4729.63 4528.53 MTCE0253-267 MTCE R4 FY19 I25 CONCRETE PAN 12/13/18 2.00 3000.00 687.20 530.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 4.00 2810.61 2810.61 2810.61 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 18.00 2932.77 2288.16 2322.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 2787.78 2420.93 2338.76 =============== 630-80370 Conc Barrier (Temp) Lin Foot =============================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 220.00 40.00 78.98 75.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 160.00 50.00 63.25 29.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 570.00 40.00 50.00 50.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 7,725.00 32.00 28.94 24.75 ER1151-033 PR SH 115-MP 34.7 01/25/18 103.00 30.00 52.69 110.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 12,712.00 30.00 50.70 55.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 14,000.00 30.00 39.28 25.94 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 4,455.00 40.00 41.68 26.19 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 300.00 40.00 60.70 60.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 3,818.00 40.00 46.09 40.00 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 265.00 40.00 33.50 35.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 1,200.00 45.00 38.90 30.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 1,000.00 30.00 67.68 43.35 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 1,800.00 35.00 28.50 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 48,328.00 32.94 41.96 35.80 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 2,990.00 38.00 29.65 26.35 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 3,000.00 24.00 22.30 15.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 611 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80370 Conc Barrier (Temp) Lin Foot =============================================== FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 300.00 60.00 50.89 34.10 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 1,250.00 45.00 50.25 42.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 5,217.00 45.00 29.00 10.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 600.00 44.00 55.19 65.75 FBR0705-087 I-70: EMERGENCY BRIDGE G-25-K 05/16/18 1,000.00 40.00 40.00 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 14,357.00 39.08 30.74 22.16 FBR060A-022 SH 60 over the South Platte 07/12/18 2,400.00 30.00 28.82 25.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 175.00 35.00 64.46 31.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 600.00 35.00 40.33 27.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 270.00 40.00 57.27 16.80 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 57,492.00 47.93 47.93 47.93 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 60.00 30.00 68.82 48.00 STA052A-040 SH 52: Antelope Creek 08/23/18 120.00 45.00 57.50 28.00 M850-027 US24E MANITOU AVE. AT RUXTON 08/28/18 100.00 50.00 79.12 97.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 61,217.00 47.01 42.30 46.68 NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 2,025.00 40.00 26.50 23.00 BR1131-006 SH 113 AT MP 11.5 10/11/18 490.00 30.00 42.46 37.50 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 16,200.00 40.00 39.54 34.85 NHPP0702-366 I-70 Avon to Vail 11/08/18 825.00 45.00 61.60 90.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 2,077.00 32.00 38.79 28.68 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 1,200.00 70.00 58.07 60.18 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 2,220.00 33.00 31.11 14.17 ER052A-039 SH 170 11/15/18 100.00 40.00 56.71 55.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 648.00 70.10 61.18 61.18 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 100.00 30.00 82.95 25.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 100.00 40.00 68.17 64.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 1,280.00 50.00 75.21 34.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 1,000.00 50.00 31.90 42.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 26,366.00 25.00 32.63 20.50 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 1,000.00 30.00 27.05 8.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 93,200.00 47.87 47.87 47.87 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 148,831.00 42.50 40.61 40.43 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 272,733.00 41.64 40.15 40.05 =============== 630-80371 Reset Concrete Barrier (Temp) Lin Foot =============================================== ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 2,000.00 13.79 15.00 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,000.00 13.79 15.00 15.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 612 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80371 Reset Concrete Barrier (Temp) Lin Foot =============================================== STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 600.00 10.00 26.58 26.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 600.00 10.00 26.58 26.10 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 16,200.00 15.00 8.28 3.08 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 100.00 15.00 23.49 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 16,300.00 15.00 8.49 3.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18,900.00 14.71 9.73 5.13 =============== 630-80372 Conc Barrier (Temp) (Furnish & Install) Lin Foot =============================================== CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 1,500.00 59.62 51.00 51.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,500.00 59.62 51.00 51.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,500.00 59.62 51.00 51.00 =============== 630-80373 Concrete Barrier (Temporary)(Remove) Lin Foot =============================================== ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 2,000.00 14.28 15.00 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,000.00 14.28 15.00 15.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 168.00 10.00 31.88 17.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 168.00 10.00 31.88 17.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,168.00 13.95 21.25 15.15 =============== 630-80377 Port Water Filled Barrier (Temp) Lin Foot =============================================== NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 1,000.00 60.00 50.00 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,000.00 60.00 50.00 50.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 613 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80377 Port Water Filled Barrier (Temp) Lin Foot =============================================== C R500-198 R5 GUARDRAIL REPLACEMENT/UPGR 11/29/18 120.00 80.00 30.00 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 120.00 80.00 30.00 25.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,120.00 62.14 46.13 47.32 =============== 630-80378 Glare Screen (Temp) Lin Foot =============================================== FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 7,231.00 18.00 18.28 15.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 4,140.00 20.00 22.09 18.30 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 4,276.00 15.00 18.78 10.86 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 2,500.00 18.00 15.73 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 18,147.00 17.75 19.15 14.78 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 1,500.00 32.14 32.14 32.14 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,500.00 32.14 32.14 32.14 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 4,290.00 33.26 33.26 33.26 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,290.00 33.26 33.26 33.26 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 23,937.00 21.43 19.86 19.18 =============== 630-80380 Traffic Cone Each =================================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 150.00 5.00 4.57 1.13 STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 200.00 10.00 8.43 1.00 STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 200.00 7.00 17.23 15.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 200.00 8.00 5.67 6.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 300.00 8.00 3.35 10.25 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 250.00 10.00 12.25 20.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 125.00 11.90 13.30 12.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 614 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80380 Traffic Cone Each =================================================== STA0342-060 US 34D OVERLAY AND BRIDGE WOR NHPP0702-373 I-70 GWC Longitudinal Joint R 01/11/18 200.00 10.00 11.00 12.00 MTCER100-296 MTCE R1 FY18 WEST SIGN REPLAC 01/11/18 200.00 9.00 6.00 1.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 100.00 10.00 11.50 12.00 CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 80.00 8.42 7.00 7.00 MTCE0712-017 SH 71 CHIP SEAL MP 123 TO MP 01/18/18 600.00 5.00 3.33 4.00 ITSSW01-833 ABOUT 1.5 MILES NORTH OF THE 01/18/18 100.00 13.00 7.44 6.00 STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 200.00 8.00 1.00 1.00 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 75.00 3.25 8.51 10.00 NHPP5502-088 US 550 RIVERSIDE SNOW SHED LI 01/25/18 40.00 5.00 6.83 1.23 ER1151-033 PR SH 115-MP 34.7 01/25/18 67.00 10.00 28.97 9.75 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 300.00 8.00 10.11 5.50 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 50.00 10.00 8.54 9.44 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 300.00 8.00 15.31 16.34 C0703-440 AVALANCHE CONTROL SYSTEM: EJM 02/01/18 130.00 7.00 8.42 5.85 STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 200.00 11.00 5.75 5.25 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 505.00 6.00 1.02 1.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 300.00 8.00 9.22 2.00 NHPP5502-096 US550 STRIPING & RUMBLE STRIP 03/01/18 150.00 10.00 1.31 1.05 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 80.00 10.00 9.88 7.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 275.00 8.00 9.81 6.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 50.00 10.00 21.17 9.00 NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 200.00 7.00 1.05 1.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 200.00 10.00 6.35 5.50 MTCER500-201 R5 FY18 SIGN REPLACEMENT 03/08/18 50.00 6.00 4.43 1.00 MTCER500-203 WITHIN CDOT'S R5 MAINTENANCE 03/08/18 600.00 4.00 2.50 2.00 NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 100.00 10.00 5.80 6.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 100.00 12.00 1.52 1.04 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6,677.00 7.75 7.79 5.87 NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPL 04/05/18 25.00 10.00 13.67 18.00 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 1,775.00 5.00 10.26 13.80 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 40.00 9.00 5.34 10.64 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 100.00 10.00 5.42 6.00 STAR400-347 Various intersections across 04/12/18 40.00 12.00 13.33 20.00 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 100.00 9.00 9.28 9.00 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 200.00 10.00 9.50 9.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 100.00 10.00 3.88 4.40 STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 40.00 13.00 9.69 11.00 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 180.00 7.00 2.31 1.00 MTCE0701-246 MTCE R3 FY18 I-70 CENTERLINE 05/03/18 400.00 5.00 3.63 0.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 615 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80380 Traffic Cone Each =================================================== NH0242-071 US 24 & 31ST STREET and US24 05/03/18 100.00 5.00 14.91 12.00 FSA0711-020 SH 71 & SH 94: PUNKIN CENTER 05/03/18 150.00 10.00 7.00 3.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 300.00 9.00 7.02 8.09 FBR0705-087 I-70: EMERGENCY BRIDGE G-25-K 05/16/18 100.00 12.00 12.00 12.00 MTCE R100-312 R1 CHIP SEAL 05/17/18 200.00 10.00 5.00 5.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 100.00 15.00 3.00 3.00 MTCER300-244 MTCE R3 FY 18/19 REGIONWIDE S 05/31/18 250.00 1.00 1.00 1.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 40.00 10.00 7.52 5.00 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 200.00 6.00 23.00 22.00 MPR200-251 R2 FY19 PAVEMENT MARKING 06/21/18 200.00 20.00 6.25 5.00 ER055A-001 PR SH 55 FLOOD REPAIR 2015 06/28/18 100.00 10.00 9.66 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4,740.00 7.36 8.62 9.17 NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 150.00 8.00 15.00 15.00 FBR060A-022 SH 60 over the South Platte 07/12/18 100.00 15.00 3.68 1.00 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 100.00 10.00 6.91 1.13 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 100.00 2.00 3.03 1.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 50.00 10.00 10.20 13.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 100.00 6.00 12.73 11.20 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 800.00 17.71 17.71 17.71 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 100.00 6.60 7.57 4.00 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 100.00 11.00 12.00 8.00 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 400.00 7.00 1.58 2.00 C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 200.00 10.00 7.59 8.55 STA052A-040 SH 52: Antelope Creek 08/23/18 50.00 10.00 1.43 1.10 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 100.00 10.00 7.11 3.00 M850-027 US24E MANITOU AVE. AT RUXTON 08/28/18 60.00 6.00 8.50 4.50 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 25.00 8.50 8.28 11.00 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 200.00 12.00 14.00 12.00 STM0252-469 R2 ADA RAMPS I-25 INT S NEV- 09/06/18 200.00 8.00 10.53 9.05 NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 150.00 10.00 2.00 2.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 100.00 9.00 8.73 10.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 55.00 15.00 4.13 7.50 NHPP070A-032 I-70B & Z GRAND JCT PHASE 1 A 09/20/18 150.00 8.00 6.13 1.00 STMR200-246 R2–2018 CRITICAL CULVERTS REP 09/20/18 75.00 15.00 8.00 8.00 MTCE0704-244 Crack Seal I-70 MP 328 TO MP 09/27/18 300.00 5.00 14.00 14.00 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 200.00 7.00 9.50 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,865.00 10.41 8.16 9.05 NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 100.00 8.00 8.00 14.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 616 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80380 Traffic Cone Each =================================================== BR1131-006 SH 113 AT MP 11.5 10/11/18 50.00 10.00 10.14 13.89 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 40.00 10.00 13.38 13.00 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 300.00 8.00 5.00 5.00 SHER200-243 R2 WRONG WAY PREVENTION 10/18/18 400.00 6.00 3.00 5.00 SHE2254-092 SH225 AND 17TH PLACE IMPROVEM 10/18/18 50.00 5.87 17.67 5.00 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 200.00 8.00 4.74 1.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 800.00 6.00 3.38 3.14 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 50.00 10.00 9.24 12.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 25.00 10.00 13.17 14.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 400.00 8.00 12.37 15.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 100.00 10.00 4.25 4.20 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 500.00 10.00 2.50 4.00 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 400.00 10.00 11.02 14.55 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 200.00 7.50 10.92 20.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 100.00 10.00 3.55 1.18 ER052A-039 SH 170 11/15/18 75.00 7.00 7.51 8.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 200.00 10.50 10.83 10.83 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 150.00 15.00 12.50 12.78 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 75.00 11.00 9.62 10.00 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 100.00 12.00 8.75 5.00 C R500-198 R5 GUARDRAIL REPLACEMENT/UPGR 11/29/18 150.00 12.00 4.40 7.50 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 100.00 7.00 8.49 5.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 396.00 10.00 5.22 4.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 300.00 10.00 4.10 1.00 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 200.00 20.00 10.49 5.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 600.00 12.00 15.00 6.50 C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 200.00 8.00 11.34 6.20 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 264.00 10.00 1.01 1.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 250.00 10.00 11.44 13.59 STA052A-045 SH 52B NEW RAYMER SOUTH 12/13/18 500.00 10.00 8.00 10.00 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 40.00 12.00 17.33 17.00 STAR100-279 FY20 HMA PREVENTATIVE MAINTEN 12/13/18 200.00 12.00 7.10 10.00 MTCE0253-267 MTCE R4 FY19 I25 CONCRETE PAN 12/13/18 50.00 10.00 10.73 10.50 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 20.00 35.00 15.29 18.00 MPR200-252 REGION 2 - PUEBLO COUNTY HIGH 12/20/18 400.00 6.00 13.33 18.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1,120.00 17.71 17.71 17.71 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9,105.00 10.46 8.73 9.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 24,387.00 9.11 8.34 8.24 =============== 630-80384 Tubular Marker Each =================================================== NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 40.00 30.00 30.00 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 40.00 30.00 30.00 35.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 617 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80384 Tubular Marker Each =================================================== STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 50.00 31.00 23.73 21.92 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 50.00 31.00 23.73 21.92 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 20.00 63.64 63.64 63.64 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 20.00 63.64 63.64 63.64 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 110.00 36.57 28.47 34.26 =============== 630-80391 Channel Dev (Fixed) Each =================================================== STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 100.00 67.00 40.46 43.83 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 100.00 67.00 40.46 43.83 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 75.00 22.00 31.48 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 75.00 22.00 31.48 35.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 1,293.00 60.00 4.01 3.94 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,293.00 60.00 4.01 3.94 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,468.00 58.54 11.01 8.24 =============== 630-80392 Stackable Tubular Marker Each =================================================== NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 30.00 25.00 25.13 36.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 30.00 25.00 25.13 36.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 25.00 25.13 36.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 618 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80393 Stackable Vertical Panels Each =================================================== MTCE0712-017 SH 71 CHIP SEAL MP 123 TO MP 01/18/18 40.00 20.00 20.00 25.00 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 20.00 30.00 43.35 47.75 ER144A-002 SH 144 East and West of Goodr 03/08/18 20.00 25.00 19.42 25.00 NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 10.00 45.00 24.33 25.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 50.00 25.00 22.90 20.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 140.00 25.71 25.45 26.75 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 25.00 30.00 17.50 17.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 50.00 26.00 15.98 21.92 FBR0705-087 I-70: EMERGENCY BRIDGE G-25-K 05/16/18 100.00 23.42 23.42 23.42 MTCE R100-312 R1 CHIP SEAL 05/17/18 100.00 30.00 31.25 31.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 275.00 26.88 21.20 25.41 NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 60.00 30.00 28.00 28.00 C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 50.00 30.00 21.88 32.50 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 40.00 32.00 35.50 14.00 STM0252-469 R2 ADA RAMPS I-25 INT S NEV- 09/06/18 150.00 23.00 34.95 33.90 NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 60.00 35.00 12.00 12.00 NHPP070A-032 I-70B & Z GRAND JCT PHASE 1 A 09/20/18 60.00 35.00 8.13 5.00 MTCE0704-244 Crack Seal I-70 MP 328 TO MP 09/27/18 32.00 18.00 17.00 17.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 452.00 28.33 26.24 23.26 BR1131-006 SH 113 AT MP 11.5 10/11/18 20.00 25.00 37.83 55.56 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 10.00 25.00 40.00 25.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 50.00 30.00 17.00 15.00 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 50.00 25.00 23.83 23.23 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 26.00 30.00 21.47 9.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 50.00 25.00 25.50 43.00 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 200.00 30.00 30.47 15.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 100.00 30.00 31.63 34.00 C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 50.00 30.00 31.54 22.70 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 30.00 28.00 20.67 17.00 STAR100-279 FY20 HMA PREVENTATIVE MAINTEN 12/13/18 100.00 35.00 23.00 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 686.00 29.69 27.85 23.62 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,553.00 28.44 26.70 24.11 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 619 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80401 Delin (Ty I) (Temp) Each =================================================== ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 10.00 10.00 32.34 16.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 10.00 32.34 16.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 30.00 37.12 37.12 37.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 30.00 37.12 37.12 37.12 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 30.00 37.12 37.12 37.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 30.00 37.12 37.12 37.12 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 70.00 33.25 34.39 34.10 =============== 630-80402 Delin (Ty II) (Temp) Each =================================================== ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 10.00 10.00 33.09 16.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 10.00 33.09 16.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 10.00 33.09 16.00 =============== 630-80403 Delin (Ty III) (Temp) Each =================================================== ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 10.00 10.00 33.59 19.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 10.00 33.59 19.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 10.00 33.59 19.00 =============== 630-80415 Adv Warn Flash or Seq Panel (C Type) Day ==================================================== C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 17.00 37.12 37.12 37.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 17.00 37.12 37.12 37.12 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 620 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80415 Adv Warn Flash or Seq Panel (C Type) Day ==================================================== NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 30.00 50.00 76.25 84.00 SHER200-243 R2 WRONG WAY PREVENTION 10/18/18 20.00 40.00 125.00 100.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 20.00 105.00 162.37 162.37 MPR200-252 REGION 2 - PUEBLO COUNTY HIGH 12/20/18 60.00 100.00 130.00 300.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 10.00 37.12 37.12 37.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 140.00 76.94 111.27 186.70 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 157.00 72.63 108.01 170.51 =============== 630-80430 Rumble Strip (Port) Each =================================================== BR1131-006 SH 113 AT MP 11.5 10/11/18 2.00 1850.00 1574.30 1111.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 1850.00 1574.30 1111.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1850.00 1574.30 1111.00 =============== 630-80440 Port Rumble Strips (Temp) Each =================================================== STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 12.00 2000.00 835.39 1775.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 18.00 2500.00 921.25 785.00 NHPP0702-373 I-70 GWC Longitudinal Joint R 01/11/18 18.00 1000.00 1100.00 1200.00 STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 18.00 900.00 750.00 750.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 24.00 875.00 874.53 762.40 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 24.00 875.00 963.84 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 114.00 1273.68 913.66 989.72 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 6.00 2500.00 2335.22 2081.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 2500.00 2335.22 2081.75 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 18.00 900.00 1290.20 670.60 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 621 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80440 Port Rumble Strips (Temp) Each =================================================== C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 10.00 6395.46 6395.46 6395.46 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 28.00 2862.66 2087.90 2715.19 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 36.00 1500.00 1500.00 1500.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 18.00 2500.00 1549.17 1300.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 12.00 2000.00 909.46 678.38 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 66.00 1863.64 1426.16 1296.07 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 214.00 1697.92 1235.29 1340.58 =============== 630-80511 Mobile Pvmt Marking Zone LUMP SUM =============================================== STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 1.00 5000.00 2841.09 3000.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 1.00 5000.00 5631.15 8000.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 1.00 2500.00 9125.00 15000.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 1.00 4000.00 6030.40 6000.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 1.00 10000.00 2577.25 3000.00 NHPP5502-096 US550 STRIPING & RUMBLE STRIP 03/01/18 1.00 10000.00 5106.25 2525.00 NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 1.00 10000.00 2762.24 2500.00 MTCER500-202 R5 FY18 STRIPING 03/08/18 1.00 7000.00 15600.00 45000.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 1.00 4000.00 2800.00 2600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9.00 6388.89 6275.66 9736.11 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 1.00 15000.00 4897.75 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 15000.00 4897.75 3000.00 MTCER400-365 REGION 4 FY 19 EPOXY 1 10/18/18 1.00 2500.00 8166.67 2500.00 FSA076A-011 I-76 FROM MM 25 TO MM 100 10/18/18 1.00 2500.00 9000.00 10000.00 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 1.00 5000.00 2700.00 2400.00 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 1.00 6000.00 3252.15 2400.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 1.00 6000.00 7365.72 2497.16 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 1.00 5000.00 7250.00 6500.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 622 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80511 Mobile Pvmt Marking Zone LUMP SUM =============================================== NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 1.00 10000.00 7931.67 12000.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 1.00 3000.00 4066.68 5025.03 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 1.00 3000.00 3986.69 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9.00 4777.78 6159.32 5369.13 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19.00 6078.95 6146.70 7313.01 =============== 630-80520 Mobile Pvmt Mkg Zone Day ==================================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 2.00 1000.00 825.00 1000.00 STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 2.00 500.00 2940.00 3150.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 1.00 3000.00 2991.56 975.00 FSAR200-247 US 287 FROM MP 0.00 (STATE LI 03/08/18 40.00 475.00 1.13 1.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 45.00 555.56 458.80 207.22 MPR200-251 R2 FY19 PAVEMENT MARKING 06/21/18 100.00 200.00 256.25 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 100.00 200.00 256.25 50.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 25.00 318.18 318.18 318.18 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 25.00 318.18 318.18 318.18 NHPP0702-366 I-70 Avon to Vail 11/08/18 5.00 2500.00 726.48 700.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 4.00 1750.00 1855.83 1200.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 10.00 1500.00 1405.09 1436.34 STA052A-045 SH 52B NEW RAYMER SOUTH 12/13/18 5.00 2500.00 916.67 1050.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 24.00 1958.33 1303.26 1163.06 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 194.00 515.23 457.30 258.73 =============== 630-85006 Impact Atten (Sand Fill) (Temp) Each =================================================== NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 2.00 4000.00 2862.50 2650.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 623 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-85006 Impact Atten (Sand Fill) (Temp) Each =================================================== STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 12.00 2000.00 1045.25 242.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 14.00 2285.71 1304.86 586.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 7.00 3600.00 6681.48 6000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7.00 3600.00 6681.48 6000.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 2.00 3000.00 4866.67 5900.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 2.00 4000.00 2997.93 2793.80 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 3.00 7975.58 7975.58 7975.58 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7.00 5418.11 4776.87 5902.05 NHPP0702-366 I-70 Avon to Vail 11/08/18 6.00 4000.00 3278.01 4865.00 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 2.00 4000.00 1345.84 1000.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 4.00 6967.11 6967.11 6967.11 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 12.00 4989.04 3371.05 4921.54 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 3874.88 3716.50 3764.42 =============== 630-85010 Impact Atten (Temp) Each =================================================== STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 8.00 4000.00 1874.91 2700.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 2.00 3000.00 2568.75 1575.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 4.00 4000.00 5798.75 4000.00 CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 5.00 7158.07 5360.00 5360.00 ER1151-033 PR SH 115-MP 34.7 01/25/18 1.00 2065.00 14917.85 12500.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 5.00 5000.00 3551.10 1250.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 12.00 3500.00 4552.87 2360.76 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 3.00 5000.00 4690.17 2287.21 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 2.00 3500.00 5313.47 7000.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 3.00 5000.00 2255.75 3500.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 2.00 1500.00 3570.47 2640.94 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 624 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-85010 Impact Atten (Temp) Each =================================================== NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 4.00 450.00 9650.00 7300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 51.00 3934.42 4336.25 3538.68 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 4.00 8000.00 5564.84 5850.40 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 4.00 8800.00 1573.20 1600.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 2.00 3700.00 4195.94 3767.50 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 2.00 4000.00 4133.79 2035.16 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 2.00 7000.00 10000.00 10000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 14.00 6900.00 4351.89 4386.21 FBR060A-022 SH 60 over the South Platte 07/12/18 4.00 5000.00 2706.10 2000.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 4.00 2000.00 3095.71 2775.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 14.00 13425.72 13425.72 13425.72 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 1.00 4000.00 8266.81 4870.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 23.00 9563.48 4655.32 9214.35 NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 2.00 4000.00 7275.00 3500.00 BR1131-006 SH 113 AT MP 11.5 10/11/18 2.00 3500.00 9413.64 9400.00 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 2.00 5000.00 3411.92 2500.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 2.00 5000.00 2853.80 4865.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 2.00 3500.00 9328.33 10000.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 2.00 5000.00 1542.50 800.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 4.00 3250.00 2100.50 1770.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 4.00 840.00 1180.98 1180.98 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 2.00 3500.00 3490.71 2205.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 4.00 2500.00 2743.36 1250.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 10.00 10000.00 10053.98 12500.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 27.00 13815.35 13815.35 13815.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 63.00 8863.09 6711.29 9227.91 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 151.00 7123.11 5143.19 6855.42 =============== 630-85011 Imp Atten (Temp) Day ==================================================== NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 120.00 45.00 15.98 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 120.00 45.00 15.98 11.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 625 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-85011 Imp Atten (Temp) Day ==================================================== NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 100.00 100.00 316.67 115.02 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 100.00 100.00 316.67 115.02 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 220.00 70.00 131.63 58.28 =============== 630-85013 Impact Atten (Temp)(Reset) Each =================================================== ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 4.00 1837.02 1470.00 1470.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 1837.02 1470.00 1470.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 2.00 1250.00 1180.00 735.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 1250.00 1180.00 735.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 1641.35 1244.44 1225.00 =============== 630-85014 Impact Atten(Temp)(Remove) Each =================================================== ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 4.00 1837.02 1470.00 1470.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 1837.02 1470.00 1470.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 1837.02 1470.00 1470.00 =============== 630-85020 Mobile Attenuator Each =================================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 1.00 12000.00 7725.00 7000.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 2.00 18500.00 41298.75 43590.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 2.00 15000.00 596.67 600.00 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 1.00 35000.00 30061.33 32604.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 19000.00 28518.30 21330.67 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 626 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-85020 Mobile Attenuator Each =================================================== SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 2.00 15000.00 8650.00 8000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 15000.00 8650.00 8000.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 2.00 16500.00 20333.33 20000.00 STMR200-246 R2–2018 CRITICAL CULVERTS REP 09/20/18 2.00 3500.00 5000.00 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 10000.00 18142.86 12500.00 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 2.00 25000.00 11319.51 4671.00 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 1.00 15000.00 18528.16 11612.65 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 4.00 10000.00 22596.84 10000.00 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 4.00 7000.00 27378.73 6500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 11.00 12090.91 22370.69 7904.97 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 23.00 13782.61 22928.89 12214.72 =============== 630-85040 Impact Atten (T-M-A) (Temp) Each =================================================== STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 1.00 4000.00 16173.40 14000.00 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 2.00 4500.00 12858.00 14075.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 1.00 2900.00 105736.94 64920.91 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 2.00 4500.00 25301.71 28317.98 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 2.00 7000.00 13336.42 5000.00 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 1.00 7500.00 15875.00 10000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9.00 5155.56 29742.49 20411.87 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 1.00 5000.00 44077.00 43700.00 MTCE0701-246 MTCE R3 FY18 I-70 CENTERLINE 05/03/18 2.00 500.00 3775.00 600.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 1.00 5000.00 34013.20 18000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 2750.00 23929.69 15725.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 627 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-85040 Impact Atten (T-M-A) (Temp) Each =================================================== SHE0701-245 I-70 MEDIAN CABLE RAIL INSTAL 07/12/18 2.00 10000.00 43000.00 43000.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 1.00 45000.00 14733.06 12000.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 1.00 10500.00 8137.56 7000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 18875.00 15530.40 26250.00 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 2.00 12000.00 8090.47 18000.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 3.00 45000.00 42294.51 32000.00 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 2.00 20000.00 10476.13 20000.00 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 2.00 40000.00 39596.09 35000.00 MTCE0253-267 MTCE R4 FY19 I25 CONCRETE PAN 12/13/18 2.00 15000.00 6757.75 5825.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 11.00 28090.91 22864.46 23059.09 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 28.00 15782.14 24937.21 21616.32 =============== 630-85041 Mobile Attenuator Day ==================================================== STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 20.00 700.00 528.88 500.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 30.00 450.00 343.33 350.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 126.00 350.00 155.00 165.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 68.00 390.00 543.20 500.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR NHPP0702-373 I-70 GWC Longitudinal Joint R 01/11/18 23.00 400.00 437.50 375.00 MTCER100-296 MTCE R1 FY18 WEST SIGN REPLAC 01/11/18 20.00 380.00 382.75 10.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 60.00 290.00 356.50 242.00 ITSSW01-833 ABOUT 1.5 MILES NORTH OF THE 01/18/18 25.00 450.00 264.50 100.00 STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 40.00 350.00 300.00 300.00 ER144A-002 SH 144 East and West of Goodr 03/08/18 10.00 400.00 246.48 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 422.00 382.87 330.51 279.94 NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPL 04/05/18 40.00 500.00 368.67 316.00 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 60.00 550.00 206.67 120.00 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 20.00 165.00 84.67 80.00 STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 25.00 325.00 443.00 225.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 628 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-85041 Mobile Attenuator Day ==================================================== NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 60.00 350.00 548.42 600.00 MTCE R100-312 R1 CHIP SEAL 05/17/18 40.00 550.00 800.00 800.00 MTCER300-244 MTCE R3 FY 18/19 REGIONWIDE S 05/31/18 70.00 100.00 68.33 50.00 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 420.00 300.00 611.67 550.00 MPR200-251 R2 FY19 PAVEMENT MARKING 06/21/18 20.00 250.00 350.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 755.00 325.07 476.77 439.16 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 75.00 350.00 469.60 558.80 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 1,135.00 668.18 668.18 668.18 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 7.00 600.00 564.11 485.00 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 70.00 350.00 385.00 150.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 45.00 325.00 142.00 365.00 MTCE0704-244 Crack Seal I-70 MP 328 TO MP 09/27/18 40.00 550.00 578.00 578.00 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 70.00 200.00 573.50 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,442.00 599.14 563.61 609.04 SHER200-243 R2 WRONG WAY PREVENTION 10/18/18 75.00 300.00 352.50 280.00 SHE2254-092 SH225 AND 17TH PLACE IMPROVEM 10/18/18 5.00 279.94 675.00 550.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 40.00 300.00 500.32 365.96 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 550.00 540.00 573.09 227.28 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 150.00 375.00 313.63 300.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 30.00 350.00 214.50 190.00 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 40.00 450.00 493.75 300.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 40.00 550.00 400.90 435.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 500.00 350.00 392.38 450.00 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 40.00 600.00 248.00 219.00 STAR100-279 FY20 HMA PREVENTATIVE MAINTEN 12/13/18 70.00 500.00 550.00 300.00 MPR200-252 REGION 2 - PUEBLO COUNTY HIGH 12/20/18 50.00 300.00 400.00 325.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1,352.00 668.18 668.18 668.18 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,942.00 541.14 483.46 481.94 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,561.00 514.83 475.57 493.76 =============== 630-86801 Traffic Signal (Temp) LUMP SUM =============================================== NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 1.00 35000.00 9150.00 5500.00 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 1.00 10000.00 17151.60 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 22500.00 13950.96 5250.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 629 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-86801 Traffic Signal (Temp) LUMP SUM =============================================== FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 1.00 15000.00 63995.55 60000.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 1.00 50000.00 31297.50 19500.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 15750.00 84297.69 84297.69 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 26916.67 49338.37 54599.23 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 25150.00 33253.18 34859.54 =============== 630-86810 Traffic Signal (Temp) Each =================================================== ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 5.00 15000.00 4551.88 3590.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 15000.00 4551.88 3590.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 1.00 30000.00 15441.63 14300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 30000.00 15441.63 14300.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 1.00 15000.00 14508.57 16500.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 2.00 35000.00 9231.27 2793.80 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 1.00 16000.00 27851.14 33000.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 2.00 18000.00 17170.62 7000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 22833.33 18478.19 11514.60 ER052A-039 SH 170 11/15/18 2.00 12500.00 8891.56 7200.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 2.00 15000.00 18006.99 22000.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 13.00 16500.00 24651.94 27000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 17.00 15852.94 21444.60 24082.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 29.00 17637.93 16113.28 17611.64 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 630 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 632-00000 Night Work Lighting LUMP SUM =============================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 1.00 15000.00 31250.00 30000.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 1.00 30000.00 64708.00 98000.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 1.00 45000.00 43046.10 50000.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 1.00 12000.00 27820.87 26714.74 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 1.00 8000.00 28157.06 30000.00 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 1.00 10000.00 7800.00 400.00 NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 1.00 40000.00 52530.69 46760.25 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 1.00 99730.40 114400.00 114400.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 1.00 25000.00 11300.00 2600.00 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 1.00 500.00 64462.85 39852.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 28523.04 39228.14 43872.75 MTCE R100-312 R1 CHIP SEAL 05/17/18 1.00 50000.00 2000.00 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 50000.00 2000.00 2000.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 1.00 187671.07 187671.07 187671.07 M850-027 US24E MANITOU AVE. AT RUXTON 08/28/18 1.00 35000.00 32273.33 12000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 111335.54 63352.88 99835.54 NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 1.00 12000.00 14262.50 3300.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 1.00 100000.00 161976.59 200000.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 15996.72 9284.34 9284.34 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 1.00 30000.00 38016.65 40566.61 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 1.00 35000.00 24650.00 4300.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 1.00 50000.00 112500.00 55000.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 238373.74 238373.74 238373.74 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 7.00 68767.21 87525.34 78689.24 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 51963.60 54351.08 59561.17 =============== 641-10000 Shotcrete Sq Yard ================================================ ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 194.00 612.89 680.00 680.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 194.00 612.89 680.00 680.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 631 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 641-10000 Shotcrete Sq Yard ================================================ NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 445.00 117.86 117.86 117.86 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 445.00 117.86 117.86 117.86 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 639.00 268.15 288.53 288.53 =============== 641-10010 Initial Shotcrete Facing Sq Foot ================================================ NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 136.00 300.00 176.55 62.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 136.00 300.00 176.55 62.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 136.00 300.00 176.55 62.00 =============== 641-10070 Shotcrete Sculpting Sq Yard ================================================ ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 194.00 302.87 340.00 340.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 194.00 302.87 340.00 340.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 194.00 302.87 340.00 340.00 =============== 642-00010 Exploder (Ty 1)(Install) Each =================================================== C0703-440 AVALANCHE CONTROL SYSTEM: EJM 02/01/18 1.00 31000.00 26782.69 13806.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 31000.00 26782.69 13806.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 31000.00 26782.69 13806.00 =============== 642-00020 Exploder (Ty 2)(Install) Each =================================================== C0703-440 AVALANCHE CONTROL SYSTEM: EJM 02/01/18 15.00 21000.00 13592.37 5040.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15.00 21000.00 13592.37 5040.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15.00 21000.00 13592.37 5040.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 632 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 642-00030 Cntrl Shelter (Ty 1)(Install) Each =================================================== C0703-440 AVALANCHE CONTROL SYSTEM: EJM 02/01/18 1.00 42500.00 35605.57 12911.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 42500.00 35605.57 12911.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 42500.00 35605.57 12911.00 =============== 670-00000 Electrical Syst LUMP SUM =============================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 17455.93 17325.00 17325.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 17455.93 17325.00 17325.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 17455.93 17325.00 17325.00