Colorado Department of Transportation 10:44 Thursday, February 28, 2019 1 2018 Cost Data PROJECTS BID FROM 01/01/18 THROUGH 12/31/18 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20180104 MEDVED GLOBAL, INC. 2 $464,108.19 128.18 FSA145A-061 SH 145 Dolores Sidewalk Ramps 5 R 20180104 HAMILTON CONSTRUCTION CO. 5 $4,751,787.00 92.49 ER0342-058 PR US 34D MP 13.75 TO MP 14.71 4 R STA0342-060 US 34D OVERLAY AND BRIDGE WORK 4 R 20180104 A and S CONSTRUCTION CO. 2 $3,317,399.50 140.36 STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 3 M 20180104 OLDCASTLE SW GROUP, INC. 4 $6,358,593.47 86.44 NHPP0402-092 US 40 RABBIT EARS WEST 3 M 20180104 A and S CONSTRUCTION CO. 4 $4,170,000.00 86.88 STR069A-032 SH69, MP 25.7 TO MP 50.1 2 R 20180104 OLDCASTLE SW GROUP, INC. 4 $7,993,121.01 93.38 STR133A-046 SH 133 BOWIE RESURFACING 3 R 20180104 KIEWIT INFRASTRUCTURE CO. 3 $732,877.25 99.04 SHE0212-010 SH 21, OMAHA INTERSECTION IMPR 2 U 20180111 CONNELL RESOURCES, INC. 4 $5,649,240.45 89.15 STA0142-065 SH-14 RESURF FT COLLINS, LEMAY 4 R 20180111 OLDCASTLE SW GROUP, INC. 2 $706,000.00 105.72 NHPP0702-373 I-70 GWC Longitudinal Joint Re 3 M 20180111 CC ENTRPRS TRAFFIC CONTROL SPECIALISTS 4 $288,151.00 71.03 MTCER100-296 MTCE R1 FY18 WEST SIGN REPLACE 1 M 20180111 SEMA CONSTRUCTION, INC. 10 $1,348,026.50 84.25 ER0252-466 PR MONUMENT CREEK BRANCH 2 R 20180112 KIEWIT INFRASTRUCTURE CO. 1 $6,244,782.75 102.88 CC0341-098 PR US 34 BTC LARIMER COUNTY ST 4 M 20180118 OLDCASTLE SW GROUP, INC. 1 $2,508,762.75 99.01 STR133A-045 SH 133 MCCLURE PASS TO REDSTON 3 M 20180118 INTERFACE COMMUNICATIONS COMPANY 4 $260,990.00 60.10 ITSSW01-833 ABOUT 1.5 MILES NORTH OF THE N 00 U 20180118 AMERICAN WEST CONSTRUCTION, LLC 6 $587,531.00 117.51 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.19 2 P 20180118 A-1 CHIPSEAL COMPANY 3 $986,679.32 97.58 MTCE0712-017 SH 71 CHIP SEAL MP 123 TO MP 1 4 P 20180125 MAIN ELECTRIC LTD 5 $673,129.18 134.64 NHPP5502-088 US 550 RIVERSIDE SNOW SHED LIG 5 M Colorado Department of Transportation 10:44 Thursday, February 28, 2019 2 2018 Cost Data PROJECTS BID FROM 01/01/18 THROUGH 12/31/18 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20180125 RALPH L. WADSWORTH CONSTRUCTION CO., LLC 7 $8,269,006.74 118.13 BR0252-444 Ramp BMP I-25 and Rockrimmon 2 U 20180125 AMERICAN WEST CONSTRUCTION, LLC 4 $528,827.75 113.24 ER1151-033 PR SH 115-MP 34.7 2 M ER1151-034 PR SH 115-MP 40.5 2 M NH0242-086 PR US24 MONTESSORI WALL MP 294 2 M 20180125 HAMILTON CONSTRUCTION CO. 5 $2,669,354.87 65.02 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR D 3 M 20180201 Geovert, LLC 4 $371,019.75 47.78 C0703-440 AVALANCHE CONTROL SYSTEM: EJMT 3 M 20180201 LAWRENCE CONSTRUCTION CO. 7 $2,587,000.00 101.39 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NEA 3 M 20180208 ARROW ELECTRIC SERVICE, INC. 3 $843,032.30 76.64 STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 2 U 20180215 A and S CONSTRUCTION CO. 4 $7,463,000.00 107.32 NHPP1602-153 US 160 SH 84 TO TREASURE FALLS 5 R 20180215 HAMILTON CONSTRUCTION CO. 5 $2,698,605.35 85.81 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE NE 3 M 20180301 FLATIRON CONSTRUCTORS, INC. 8 $12,889,175.73 95.47 ER007A-026 PR SH-7 FLOOD (PH II),EP - JCT 4 M STA007A-025 SH-7 NON FLOOD, SHO (PH II),EP 4 M 20180301 Kilgore Companies, LLC dba Elam Construc 4 $660,992.61 88.47 NHPP5502-096 US550 STRIPING & RUMBLE STRIPS 5 R 20180301 JALISCO INTERNATIONAL, INC. 4 $435,638.25 96.80 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROVE 1 U 20180308 CASTLE ROCK CONST. CO. OF COLO, LLC 10 $5,230,572.48 73.15 ER144A-002 SH 144 East and West of Goodri 4 P 20180308 MCATEE CONSTRUCTION CO. 8 $2,311,447.40 108.13 STA1381-008 SH 138 LODGEPOLE CREEK & HMA O 4 R 20180308 OLDCASTLE SW GROUP, INC. 4 $3,812,025.65 79.54 NHPP1602-166 US 160 JCT 172 TO BAYFIELD RES 5 M 20180308 AMERICAN WEST CONSTRUCTION, LLC 3 $234,000.00 85.09 NH0504-904 CRITICAL CULVERT REPAIR - SH50 2 P 20180308 DIAMOND SURFACE, INC. 2 $611,952.80 156.91 FSAR200-247 US 287 FROM MP 0.00 (STATE LIN 2 R Colorado Department of Transportation 10:44 Thursday, February 28, 2019 3 2018 Cost Data PROJECTS BID FROM 01/01/18 THROUGH 12/31/18 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20180308 WORK ZONE TRAFFIC CONTROL 7 $232,254.78 62.11 MTCER500-201 R5 FY18 SIGN REPLACEMENT 5 M 20180308 PAVEMENT MARKING, INC 5 $1,387,500.00 91.22 MTCER500-202 R5 FY18 STRIPING 5 M 20180308 A-1 CHIPSEAL COMPANY 2 $386,075.00 120.27 MTCER500-203 WITHIN CDOT'S R5 MAINTENANCE S 5 R 20180315 STRUCTURES, INC. 2 $1,666,197.47 131.92 NHPP1602-164 US 160 WOLF CREEK PASS RSA 5 M 20180328 KIEWIT INFRASTRUCTURE CO. 1 $5,973,274.10 98.58 ER0341-099 PR US 34 BIG THOMPSON CANYON P 4 M 20180329 JALISCO INTERNATIONAL, INC. 2 $2,899,893.50 97.53 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESURF 1 U 20180329 STRUCTURES, INC. 3 $1,557,188.80 147.35 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 & 1 M 20180329 ROADSAFE TRAFFIC SYSTEMS, INC 4 $1,597,895.26 86.11 MTCER300-245 MTCE R3 FY 18/19 REGIONWIDE EP 3 M 20180405 INTERFACE COMMUNICATIONS COMPANY 3 $307,077.48 91.56 NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPLA 1 U 20180412 SEMA CONSTRUCTION, INC. 3 $3,099,324.65 77.26 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR RE 1 R 20180412 PAONIA, INC 3 $1,748,999.00 120.56 STAR400-347 Various intersections across C 4 U 20180412 DRILL TECH DRILLING AND SHORING, INC. 5 $2,188,779.00 128.75 STM0242-081 US 24 ROCKFALL MITIGATION 2 M 20180412 LAWRENCE CONSTRUCTION CO. 10 $2,759,000.00 91.97 FBR069A-034 REPLACEMENT OF STR M-16-P 2 R 20180419 KIRKLAND CONSTRUCTION, LLLP 5 $1,970,003.22 98.50 FBR096A-047 STRUCTURE K-17-F FASTER BRIDGE 2 R 20180419 OLDCASTLE SW GROUP, INC. 4 $5,047,326.12 90.23 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COUN 3 M 20180419 KIRKLAND CONSTRUCTION, LLLP 2 $2,208,069.00 84.93 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 2 R 20180419 STURGEON ELECTRIC COMPANY, INC 4 $275,385.50 87.16 STA001A-002 SIGNALIZATION OF SH1 & I-25 SB 4 P Colorado Department of Transportation 10:44 Thursday, February 28, 2019 4 2018 Cost Data PROJECTS BID FROM 01/01/18 THROUGH 12/31/18 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20180419 DIETZLER CONSTRUCTION CORP. 8 $1,152,820.58 72.14 FBR0502-081 US 50, MP 190.4 Near Sargents 5 M 20180503 WILDCAT CONSTRUCTION CO., INC. 6 $1,655,812.92 82.79 NH0242-071 US 24 & 31ST STREET and US24 & 2 R 20180503 KRAEMER - IHC JOINT VENTURE 1 $248,287,287.00 100.00 FBR0253-261 I-25 NORTH: PROSPECT - BRIDGE 4 U FBR0253-263 I-25 NORTH: HILLSBORO-BRIDGE E 4 U IM0253-255 I-25 NORTH: SH 402 TO SH 14 4 R 20180503 K.E.C.I. COLORADO, INC. 3 $351,800.00 95.14 FSA0711-020 SH 71 & SH 94: PUNKIN CENTER 4 P 20180503 INNOVATIVE MARKING SYSTEMS, INC. 4 $267,525.00 96.08 MTCE0701-246 MTCE R3 FY18 I-70 CENTERLINE T 3 M 20180510 APC CONSTRUCTION CO., LLC 4 $6,325,654.65 103.18 STA 177A-011 SH 177 Arapahoe to Hampden Res 1 R 20180516 LAWRENCE CONSTRUCTION CO. 1 $3,928,195.00 100.00 FBR0705-087 I-70: EMERGENCY BRIDGE G-25-K 4 20180517 A-1 CHIPSEAL COMPANY 1 $1,187,794.51 137.90 MTCE R100-312 R1 CHIP SEAL 1 U 20180524 KIRKLAND CONSTRUCTION, LLLP 1 $3,591,516.00 98.03 NHPPC200-009 US 550/32_22_12_17 DURANGO SIG 5 U 20180531 CC ENTRPRS TRAFFIC CONTROL SPECIALISTS 3 $341,482.00 108.02 MTCER300-244 MTCE R3 FY 18/19 REGIONWIDE SI 3 M 20180607 MOUNTAIN CONSTRUCTORS, INC. 3 $229,247.38 107.18 STA0661-016 SH 66 and US 85 (BUS) IN PLATT 4 U 20180614 Casper Electric, Inc. 3 $5,900,202.00 114.06 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 3 M 20180614 TLM CONSTRUCTORS, INC. 6 $222,460.00 130.89 NHPP0761-230 I-76 AND COUNTY ROAD 22 AT FOR 4 U 20180621 ROADSAFE TRAFFIC SYSTEMS, INC 4 $2,889,565.07 103.20 MPR200-251 R2 FY19 PAVEMENT MARKING 2 R 20180628 ABCO CONTRACTING, INC. 2 $1,017,261.00 125.69 NHPP0703-436 EJMT PLENUM WATERPROOFING MEMB 1 M 20180628 HAMILTON CONSTRUCTION CO. 11 $2,268,930.75 101.33 ER055A-001 PR SH 55 FLOOD REPAIR 2015 4 R 20180705 Western Gravel Constructors, LLC 1 $378,100.00 106.49 NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 3 U Colorado Department of Transportation 10:44 Thursday, February 28, 2019 5 2018 Cost Data PROJECTS BID FROM 01/01/18 THROUGH 12/31/18 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20180705 ROADSAFE TRAFFIC SYSTEMS, INC 2 $7,180,244.07 92.76 MTCE R100-313 R1 FY19/20 REGIONWIDE PAVEMENT 1 U 20180712 INTERFACE COMMUNICATIONS COMPANY 6 $1,376,860.00 96.27 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 5 M 20180712 TRICON 2, LLC 7 $913,000.00 89.16 STR151A-010 R5 SH 151 MP 13.36 Priority Cu 5 R 20180712 HAMILTON CONSTRUCTION CO. 12 $6,391,749.95 95.15 FBR060A-022 SH 60 over the South Platte 4 R 20180712 CRUZ CONSTRUCTION, INC. 1 $711,736.35 118.68 SHE0701-245 I-70 MEDIAN CABLE RAIL INSTALL 3 U 20180719 IDEAL FENCING CORPORATION 3 $4,562,599.24 116.91 SHE 0701-227 I-70 Wildlife Fencing mp 65-87 3 R 20180719 JALISCO INTERNATIONAL, INC. 6 $1,794,145.39 93.15 NH0853-106 US 85 AND WCR 18 Intersection 4 R 20180720 KRAEMER NORTH AMERICA, LLC 1 $57,727,234.71 100.00 C0252-475 I-25 : MONUMENT TO CASTLE ROCK 1 R 20180802 AMERICAN WEST CONSTRUCTION, LLC 4 $1,948,948.00 80.50 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REGI 1 R 20180802 CRUZ CONSTRUCTION, INC. 2 $1,796,575.52 133.08 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 1 M 20180809 STURGEON ELECTRIC COMPANY, INC 2 $1,261,561.00 92.22 STA141A-045 SH 141 CLIFTON SIGNAL REPLACEM 3 U 20180809 CAN DO CONCRETE CONSTRUCTION, INC 4 $480,157.00 105.68 C0853-109 GREELEY ADA CURB RAMPS PHASE 1 4 U 20180823 TLM CONSTRUCTORS, INC. 10 $7,343,933.20 102.21 BR025A-028 BRIDGE I25A BUTTE CREEK N-17-B 2 R 20180823 AB Underground 6 $427,519.30 101.32 STA052A-040 SH 52: Antelope Creek 4 P 20180823 A and S CONSTRUCTION CO. 4 $5,715,910.10 109.92 STR167A-002 SH 167 from MP 0 - 4.9 Near Fo 2 R 20180828 WILDCAT CONSTRUCTION CO., INC. 4 $471,906.00 47.98 M850-027 US24E MANITOU AVE. AT RUXTON A 2 M 20180906 TLM CONSTRUCTORS, INC. 7 $2,486,906.00 103.62 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69. 2 R Colorado Department of Transportation 10:44 Thursday, February 28, 2019 6 2018 Cost Data PROJECTS BID FROM 01/01/18 THROUGH 12/31/18 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20180906 VILLALOBOS CONCRETE INC. 4 $1,072,539.60 90.39 NHPPR100-287 R1 CURB RAMPS - PH 2 1 U 20180906 AVERY ASPHALT 2 $747,127.70 74.71 STM0252-469 R2 ADA RAMPS I-25 INT S NEV- N 2 U 20180906 Western Gravel Constructors, LLC 1 $459,940.00 97.56 NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RAM 3 U 20180920 PAONIA, INC 4 $983,727.75 94.40 STAR400-345 Region 4 at US 85 bus @ 26th S 4 U 20180920 Lobato Construction, LLC 11 $5,644,835.25 102.63 FBR071A-018 SH 71 ARKANSAS RIVER FASTER BR 2 R 20180920 AMERICAN WEST CONSTRUCTION, LLC 1 $428,736.00 86.61 STMR200-246 R2–2018 CRITICAL CULVERTS REPA 2 R 20180920 KSK, LLC 2 $488,000.00 68.38 NHPP070A-032 I-70B & Z GRAND JCT PHASE 1 AD 3 U 20180927 PAONIA, INC 4 $567,645.50 87.33 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 1 U 20180927 Dykhuis Drilling Corp. 1 $623,007.00 105.78 MTCE0704-244 Crack Seal I-70 MP 328 TO MP 4 P 20181004 JALISCO INTERNATIONAL, INC. 2 $477,793.50 105.69 NHPP006A-066 US 6: I-25 TO PERRY WB OPS IMP 1 U 20181011 TRICON 2, LLC 10 $1,685,000.00 117.16 BR1131-006 SH 113 AT MP 11.5 4 P 20181018 INTERFACE COMMUNICATIONS COMPANY 4 $1,803,660.00 86.86 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE I 1 U 20181018 Kilgore Companies, LLC dba Elam Construc 2 $3,175,631.51 88.90 NHPP006A-064 US 6 MACK TO FRUITA 3 R 20181018 WORK ZONE TRAFFIC CONTROL 2 $2,083,185.51 104.16 SHER200-243 R2 WRONG WAY PREVENTION 2 R 20181018 MORTON ELECTRIC, INC. 3 $98,063.50 115.37 SHE2254-092 SH225 AND 17TH PLACE IMPROVEME 1 U 20181018 KOLBE STRIPING INC. 3 $2,600,565.78 96.75 MTCER400-365 REGION 4 FY 19 EPOXY 1 4 P 20181018 INNOVATIVE MARKING SYSTEMS, INC. 5 $1,140,653.00 105.23 FSA076A-011 I-76 FROM MM 25 TO MM 100 4 R Colorado Department of Transportation 10:44 Thursday, February 28, 2019 7 2018 Cost Data PROJECTS BID FROM 01/01/18 THROUGH 12/31/18 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20181025 Kilgore Companies, LLC dba Elam Construc 4 $2,347,950.93 91.23 NHPP0401-023 US 40 ELK SPRINGS 3 R 20181101 APC SOUTHERN CONSTRUCTION COMPANY, LLC 3 $11,223,247.57 97.59 NH2854-139 US285, MP 171.3 TO MP 190.0 2 R 20181101 ASPHALT SPECIALTIES CO., INC. 5 $2,588,250.33 96.19 FSA052A-047 SH52 WCR 13 INTERSECTION 4 R 20181108 JALISCO INTERNATIONAL, INC. 7 $2,185,498.15 125.62 STA3851-017 US 385 @ Cheyenne Wells 90 Deg 4 P 20181108 OLDCASTLE SW GROUP, INC. 4 $10,134,420.73 116.69 NHPP0702-366 I-70 Avon to Vail 3 M 20181115 CONCRETE WORKS OF COLORADO INC. 5 $858,557.00 107.42 ER052A-039 SH 170 4 R 20181115 OLDCASTLE SW GROUP, INC. 2 $10,956,000.00 93.54 NHPP4912-007 US 491 MP 36.15 - MP 53.74 5 R 20181115 Myers and Sons Construction, LP 6 $2,914,980.00 105.42 NHPP0402-090 US 40 CRAIG EAST BPM 3 R 20181115 PAONIA, INC 3 $6,975,058.80 75.61 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DEM 1 U 20181115 MOUNTAIN CONSTRUCTORS, INC. 8 $1,499,075.13 89.74 C060A-023 SH-60 AND WCR-40 INTERSECTION 4 R 20181115 CASTLE ROCK CONST. CO. OF COLO, LLC 3 $44,655,433.58 93.39 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 4 P 20181115 Western Gravel Constructors, LLC 1 $586,598.20 117.53 C5502-098 US 550/160 PEDESTRIAN SIDEWALK 5 R 20181115 PAONIA, INC 4 $2,478,928.50 88.53 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO W 00 M 20181127 KRAEMER NORTH AMERICA, LLC 1 $16,421,869.66 102.96 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHAS 3 M 20181129 KIEWIT INFRASTRUCTURE CO. 6 $4,544,016.40 97.81 STA086A-051 SH 86; WEST OF I-70 4 P 20181129 DURAN EXCAVATING, INC. 7 $934,380.09 72.26 ERR400-329 PR SH14 & US287 NW OF FT COLLI 4 M 20181129 MARTIN MARIETTA MATERIALS 4 $5,274,803.15 101.23 STU1211-085 SH121 (WADSWORTH): YALE TO 4TH 1 R Colorado Department of Transportation 10:44 Thursday, February 28, 2019 8 2018 Cost Data PROJECTS BID FROM 01/01/18 THROUGH 12/31/18 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20181129 THE WALSENBURG SAND AND GRAVEL 5 $1,682,120.50 129.39 STRM331-007 I25C/SH160 PED/BIKE IMPROV (W 2 R 20181129 ABCO CONTRACTING, INC. 2 $1,372,344.40 117.59 NHPP2854-138 US 285 DECK REHABILITATION (FY 1 M 20181129 CRUZ CONSTRUCTION, INC. 2 $588,125.95 80.28 C R500-198 R5 GUARDRAIL REPLACEMENT/UPGRA 5 M 20181206 TONY J. BELTRAMO AND SONS, INC. 4 $6,510,731.20 93.01 STA050A-028 US 50C Overlay 4th to Baxter R 2 R 20181206 HAMILTON CONSTRUCTION CO. 5 $1,382,424.60 113.07 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE PA 1 U 20181206 APC SOUTHERN CONSTRUCTION COMPANY, LLC 3 $3,636,000.00 91.41 STR112A-001 SH 112 FROM US 285 TO SH 17 5 R 20181206 CAN DO CONCRETE CONSTRUCTION, INC 5 $440,123.25 92.55 C2873-192 LOVELAND ADA CURB RAMPS PHASE 4 U 20181206 GRAHAM CONTRACTING LTD 4 $21,469,443.05 105.62 IM 0253-268 I-25: 120TH (SH 128) TO E470 1 U 20181213 PARSONS CONSTRUCTION GROUP INC 4 $16,600,000.00 101.93 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 4 P 20181213 A and S CONSTRUCTION CO. 3 $5,033,000.00 83.63 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 5 P 20181213 INTERMOUNTAIN SLURRY SEAL, INC. 2 $2,344,202.00 98.83 STAR100-279 FY20 HMA PREVENTATIVE MAINTENA 1 U 20181213 SIMON CONTRACTORS 3 $5,875,267.00 94.30 STA052A-045 SH 52B NEW RAYMER SOUTH 4 P 20181213 AMERICAN CIVIL CONSTRUCTORS, LLC dba A 7 $1,415,775.00 101.13 ER0252-467 PR SOUTH DOUGLAS CREEK 2 U 20181213 W.L. CONTRACTORS, INC. 3 $2,797,304.90 84.26 SHER100-302 RAMP METERING - DENVER METRO A 1 U 20181213 RALPH L. WADSWORTH CONSTRUCTION CO., LLC 4 $687,231.00 95.78 MTCE0253-267 MTCE R4 FY19 I25 CONCRETE PANE 4 R 20181220 PAONIA, INC 3 $791,344.00 83.30 MPR200-252 REGION 2 - PUEBLO COUNTY HIGHW 2 R 20181221 KRAEMER NORTH AMERICA, LLC 1 $104,131,317.37 100.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK TO 1 R ======= ================ ====== TOTALS 548 $843,963,647.66 98.40 Colorado Department of Transportation 10:44 Thursday, February 28, 2019 1 2018 Cost Data BRIDGE COST PER SQUARE FOOT (01/01/18 THROUGH 12/31/18) ------------------------------------------------------------------------------------------------------------------------------------ PROJECT NUMBER/ TERR/ TOTAL TOTAL COST PER DATE LET PROJECT LOCATION BRIDGE ID LENGTH WIDTH SQUARE FT COST SQUARE FOOT ------------------------------------------------------------------------------------------------------------------------------------ BRIDGE REPAIR 180125 BR0252-444 U Ramp BMP I-25 and Rockrimmon 0300 480.0000 75.5000 36240.0 $271,562 $7.49 0301 480.0000 75.5000 36240.0 $281,365 $7.76 0302 515.6000 42.0000 21655.2 $186,342 $8.60 0303 105.0000 75.5000 7927.5 $120,366 $15.18 0304 105.0000 75.5000 7927.5 $120,808 $15.24 0305 447.9000 75.5000 33816.5 $212,067 $6.27 0306 448.0000 76.0000 34048.0 $217,861 $6.40 0307 134.7000 75.5000 10169.9 $128,026 $12.59 0308 134.6000 75.5000 10162.3 $128,409 $12.64 0309 445.6000 42.0000 18715.2 $152,591 $8.15 180510 STA 177A-011 R SH 177 Arapahoe to Hampden Res 0301 71.0000 66.0000 4686.0 $163,804 $34.96 181115 NHPP0402-090 R US 40 CRAIG EAST BPM 0300 105.0000 30.0000 3150.0 $464,241 $147.38 0301 138.0000 44.0000 6072.0 $549,823 $90.55 0302 253.0000 40.0000 10120.0 $320,634 $31.68 0303 272.0000 30.0000 8160.0 $310,179 $38.01 0304 22.0000 36.0000 792.0 $16,566 $20.92 181129 NHPP2854-138 M US 285 DECK REHABILITATION (FY 0300 250.0000 114.0000 28500.0 $949,923 $33.33 WEIGHTED AVERAGE COST: NEW STRUCTURES 278382.0 $4,594,565 $16.50 BRIDGE DECK REPLACEMENT 180510 STA 177A-011 R SH 177 Arapahoe to Hampden Res 0300 64.0000 68.0000 4352.0 $649,775 $149.30 WEIGHTED AVERAGE COST: NEW STRUCTURES 4352.0 $649,775 $149.30 PRESTRES GIRDER (BOX SECTION) 181221 NHPP0252-476 R I-25 SOUTH GAP: CASTLE ROCK TO 0300 0.0100 139.0000 1.4 $13,656,197 $9,824,602.31 WEIGHTED AVERAGE COST: NEW STRUCTURES 1.4 $13,656,197 $9,824,602.31 PRESTRES GIRDER (I-SECTION G-72) 181127 NHPP0702-344 M I-70G EDWARDS INT UPGRADE PHAS F-10-QA 153.5000 60.0000 9210.0 $1,841,808 $199.98 WEIGHTED AVERAGE COST: NEW STRUCTURES 9210.0 $1,841,808 $199.98 Colorado Department of Transportation 10:44 Thursday, February 28, 2019 2 2018 Cost Data BRIDGE COST PER SQUARE FOOT (01/01/18 THROUGH 12/31/18) ------------------------------------------------------------------------------------------------------------------------------------ PROJECT NUMBER/ TERR/ TOTAL TOTAL COST PER DATE LET PROJECT LOCATION BRIDGE ID LENGTH WIDTH SQUARE FT COST SQUARE FOOT ------------------------------------------------------------------------------------------------------------------------------------ MAJOR STRUCTURE CBC OR PIPES 180111 ER0252-466 R PR MONUMENT CREEK BRANCH H-17-AG 24.0000 184.0000 4416.0 $106,737 $24.17 H-17-I 26.0000 112.0000 2912.0 $153,716 $52.79 181011 BR1131-006 P SH 113 AT MP 11.5 0300 28.0000 95.0000 2660.0 $586,197 $220.37 181101 NH2854-139 R US285, MP 171.3 TO MP 190.0 0300 30.0000 34.0000 1020.0 $18,208 $17.85 181213 ER0252-467 U PR SOUTH DOUGLAS CREEK 025A145120BL 14.0000 186.5000 2611.0 $540,955 $207.18 025A145120BL - BR 14.0000 186.5000 2611.0 $128,964 $49.39 WEIGHTED AVERAGE COST: NEW STRUCTURES 16230.0 $1,534,777 $94.56 FABRICATED STEEL GIRDER 180125 FBR0701-242 M I-70 G-03-Q CO OVERFLOW NEAR D G-03-Q 614.2000 40.5000 24875.1 $963,609 $38.74 180201 FBR0702-382 M I-70 F-10-L EAGLE RIVER BR NEA F-10-L 702.2000 40.5000 28439.1 $1,069,396 $37.60 180215 FBR0701-244 M I-70 F-05-L CO RIVER BRIDGE NE F-05-L 505.0000 44.4000 22422.0 $1,185,173 $52.86 WEIGHTED AVERAGE COST: NEW STRUCTURES 75736.2 $3,218,177 $42.49 ROLLED STEEL GIRDER 181127 NHPP0702-344 M I-70G EDWARDS INT UPGRADE PHAS F-10-I 140.8330 60.0000 8450.0 $1,165,614 $137.94 WEIGHTED AVERAGE COST: NEW STRUCTURES 8450.0 $1,165,614 $137.94 PEDESTRIAN OR BIKEWAY BRIDGE 181127 NHPP0702-344 M I-70G EDWARDS INT UPGRADE PHAS F-10-QB 139.8333 14.0000 1957.7 $371,965 $190.00 F-10-IA 140.8330 14.0000 1971.7 $358,388 $181.77 WEIGHTED AVERAGE COST: NEW STRUCTURES 3929.3 $730,353 $185.87 Colorado Department of Transportation 10:44 Thursday, February 28, 2019 3 2018 Cost Data BRIDGE COST PER SQUARE FOOT (01/01/18 THROUGH 12/31/18) ------------------------------------------------------------------------------------------------------------------------------------ PROJECT NUMBER/ TERR/ TOTAL TOTAL COST PER DATE LET PROJECT LOCATION BRIDGE ID LENGTH WIDTH SQUARE FT COST SQUARE FOOT ------------------------------------------------------------------------------------------------------------------------------------ MISCELLANEOUS 180215 NHPP1602-153 R US 160 SH 84 TO TREASURE FALLS 0302 197.9000 40.0000 7916.0 $71,380 $9.02 WEIGHTED AVERAGE COST: NEW STRUCTURES 7916.0 $71,380 $9.02 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 1 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 201-00000 Clear and Grub LUMP SUM =============================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 1.00 5000.00 2089.28 2178.55 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 1.00 5000.00 43966.67 5000.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 1.00 5000.00 24375.00 20000.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 1.00 10000.00 59294.00 34670.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 1.00 30000.00 69358.00 50000.00 CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 1.00 11401.38 20400.00 20400.00 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 1.00 6000.00 17461.30 63000.00 ER1151-033 PR SH 115-MP 34.7 01/25/18 1.00 4646.00 18820.76 60000.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 1.00 5000.00 32897.36 24620.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 1.00 20000.00 54318.12 80000.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 1.00 5000.00 22053.56 5463.35 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 1.00 10000.00 13029.91 27000.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 1.00 5000.00 21387.27 12000.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 1.00 60000.00 269970.93 211500.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 1.00 40000.00 30527.86 4500.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 1.00 12000.00 29751.55 8000.00 NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 1.00 3000.00 7200.00 7000.00 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 1.00 4612.91 8500.00 8500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 18.00 13425.57 52864.76 35768.44 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 1.00 20000.00 17081.40 39050.00 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 1.00 14755.00 37500.00 25000.00 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 1.00 30000.00 33500.00 17000.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 1.00 20000.00 27668.75 2750.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 1.00 2000.00 4700.00 2000.00 ER055A-001 PR SH 55 FLOOD REPAIR 2015 06/28/18 1.00 25000.00 52366.46 22500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 18625.83 33864.35 18050.00 FBR060A-022 SH 60 over the South Platte 07/12/18 1.00 60000.00 84682.92 116000.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 1.00 10000.00 22745.00 15000.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 1.00 23000.00 57750.00 23250.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 1.00 137445.00 137445.00 137445.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 1.00 10000.00 53599.45 40000.00 STA052A-040 SH 52: Antelope Creek 08/23/18 1.00 7000.00 7582.79 2500.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 2 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 201-00000 Clear and Grub LUMP SUM =============================================== BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 1.00 8000.00 40678.57 12000.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 1.00 30000.00 69884.52 50000.00 STMR200-246 R2–2018 CRITICAL CULVERTS REP 09/20/18 1.00 4500.00 13000.00 13000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9.00 32216.11 54035.79 45466.11 BR1131-006 SH 113 AT MP 11.5 10/11/18 1.00 8000.00 32859.38 25000.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 1.00 47000.00 65622.40 6867.20 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 1.00 7000.00 21955.15 15000.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 1.00 5000.00 29932.38 31000.00 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 1.00 15000.00 21450.67 2901.34 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 1.00 50000.00 56519.17 75000.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 1.00 10000.00 24691.79 52089.29 ER052A-039 SH 170 11/15/18 1.00 8500.00 22674.00 17370.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 88477.16 88492.57 88492.57 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 1.00 5000.00 19800.00 5000.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 1.00 10000.00 22479.01 7940.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 11.00 23088.83 32013.08 29696.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 44.00 20394.03 45435.88 33817.89 =============== 201-00001 Clear and Grub Acre =================================================== ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 5.00 5000.00 11051.81 6000.00 ER1151-033 PR SH 115-MP 34.7 01/25/18 0.34 5000.00 30282.50 110000.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.34 5000.00 11561.04 12621.72 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 7.60 1400.00 2910.59 3578.94 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 3.70 3000.00 8033.33 11100.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 0.04 19800.00 109750.00 39000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 11.34 1986.95 3855.22 6157.84 SHE0701-245 I-70 MEDIAN CABLE RAIL INSTAL 07/12/18 0.80 2500.00 6000.00 6000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 0.80 2500.00 6000.00 6000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 3 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 201-00001 Clear and Grub Acre =================================================== ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 1.00 6000.00 84447.86 40000.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 122430.00 122430.00 122430.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 64215.00 89195.63 81215.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19.48 9222.90 11178.68 15629.36 =============== 201-00005 Rem of Debris LUMP SUM =============================================== STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 1.00 2000.00 788.26 725.00 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 1.00 5000.00 8607.19 850.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 3500.00 5132.11 787.50 NHPP0703-436 EJMT PLENUM WATERPROOFING MEM 06/28/18 1.00 34000.00 106368.50 18000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 34000.00 106368.50 18000.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 1.00 20000.00 35816.67 75000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 20000.00 35816.67 75000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 15250.00 27872.12 23643.75 =============== 201-00007 Rem of Debris Each =================================================== STA086A-051 SH 86; WEST OF I-70 11/29/18 4.00 1000.00 848.72 200.00 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 4.00 4475.00 6231.67 7560.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8.00 2737.50 3295.52 3880.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 2737.50 3295.52 3880.00 =============== 201-00009 Rem of Debris Cubic Yard ============================================= NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 75.00 70.00 156.03 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 75.00 70.00 156.03 250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 75.00 70.00 156.03 250.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 4 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00000 Rem Str and Obstructions LUMP SUM =============================================== CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 1.00 5367.18 1.00 1.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 5367.18 1.00 1.00 NHPP0703-436 EJMT PLENUM WATERPROOFING MEM 06/28/18 1.00 32000.00 19537.00 20000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 32000.00 19537.00 20000.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 1.00 1300.00 7570.71 3000.00 NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 1.00 2000.00 5700.00 5700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 1650.00 7336.88 4350.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 1.00 10000.00 26547.01 5000.00 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 1.00 2000.00 11000.00 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 6000.00 17909.78 3250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 8777.86 12947.90 5866.83 =============== 202-00001 Rem Structure Each =================================================== ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 1.00 1500.00 2992.28 750.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1500.00 2992.28 750.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 5.00 2000.00 10000.00 10000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 2000.00 10000.00 10000.00 M850-027 US24E MANITOU AVE. AT RUXTON 08/28/18 1.00 50000.00 70540.79 52000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 50000.00 70540.79 52000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 8785.71 24794.61 14678.57 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 5 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00004 Rem Steel H or Pipe Piling Lin Foot =============================================== NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 200.00 60.00 78.33 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 200.00 60.00 78.33 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 200.00 60.00 78.33 50.00 =============== 202-00008 Tree Trimming Hour =================================================== NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 50.00 215.00 233.33 300.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 10.00 240.00 338.75 720.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 60.00 219.17 255.53 370.00 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 12.00 385.00 95.25 100.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 1.00 200.00 568.80 190.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 13.00 370.77 155.52 106.92 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 40.00 200.00 201.67 165.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 20.00 250.00 271.39 346.57 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 60.00 216.67 219.10 225.52 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 133.00 232.86 225.16 279.11 =============== 202-00009 Tree Trimming LUMP SUM =============================================== ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 1.00 10000.00 3721.43 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 10000.00 3721.43 2500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 10000.00 3721.43 2500.00 =============== 202-00010 Rem Tree Each =================================================== ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 7.00 400.00 491.80 450.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 6 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00010 Rem Tree Each =================================================== STA0342-060 US 34D OVERLAY AND BRIDGE WOR ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 32.00 400.00 440.06 220.00 CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 1.00 354.23 750.00 750.00 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 1.00 600.00 697.35 400.00 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 11.00 300.00 1008.99 2300.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 1,534.00 135.00 195.72 250.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 12.00 150.00 677.96 265.00 NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 2.00 600.00 793.33 1400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,600.00 143.72 210.51 266.33 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 1.00 1000.00 6000.00 6000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 1000.00 6000.00 6000.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 40.00 400.00 422.07 391.20 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 50.00 435.75 435.75 435.75 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 2.00 330.00 828.94 515.00 M850-027 US24E MANITOU AVE. AT RUXTON 08/28/18 1.00 500.00 2620.63 4000.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 21.00 275.00 576.89 765.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 114.00 392.30 529.95 513.43 NHPP0702-366 I-70 Avon to Vail 11/08/18 1.00 1000.00 3529.98 2500.00 ER052A-039 SH 170 11/15/18 3.00 250.00 769.34 1060.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 74.00 554.32 554.41 554.41 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 3.00 350.00 1290.00 750.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 8.00 500.00 1206.09 1668.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 1.00 1000.00 3379.66 1200.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 34.00 300.00 579.35 750.90 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 20.00 220.00 562.86 320.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 100.00 435.75 435.75 435.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 244.00 438.50 686.85 569.70 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,959.00 195.34 237.63 321.42 =============== 202-00011 Tree Trimming Each =================================================== STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 1.00 750.00 780.50 1321.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 750.00 780.50 1321.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 750.00 780.50 1321.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 7 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00014 Brush Clearing Hour =================================================== STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 5.00 200.00 265.00 275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 200.00 265.00 275.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 200.00 265.00 275.00 =============== 202-00015 Rem Headwall Each =================================================== ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 4.00 1250.00 3805.27 4000.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 16.00 600.00 697.02 1000.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 1.00 2000.00 4341.10 6700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 21.00 790.48 1321.11 1842.86 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 8.00 1008.00 1008.00 1008.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 1008.00 1008.00 1008.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 15.00 700.00 1289.19 2132.58 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 2.00 1500.00 2426.29 1900.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 2.00 500.00 932.35 1617.77 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 1.00 1500.00 1835.57 884.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 10.00 1008.00 1008.00 1008.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 30.00 869.33 1411.18 1666.27 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 59.00 860.07 1343.52 1639.87 =============== 202-00019 Rem Inlet Each =================================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 1.00 1000.00 1936.55 2373.10 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 1.00 1000.00 860.25 1000.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 3.00 800.00 802.13 500.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 8 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00019 Rem Inlet Each =================================================== NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 4.00 1250.00 1450.00 900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9.00 1044.44 1004.35 941.46 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 1.00 300.00 1275.00 1800.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 1.00 1260.00 1550.00 1400.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 5.00 2000.00 8000.00 8000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7.00 1651.43 3988.46 6171.43 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 38.00 987.00 987.00 987.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 1.00 1500.00 1030.03 800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 39.00 1000.15 995.97 982.21 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 3.00 1020.00 2187.86 925.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 1.00 1000.00 3239.94 2000.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 2.00 1119.29 1119.49 1119.49 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 5.00 1200.00 2400.00 1500.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 2.00 800.00 1699.35 500.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 2.00 1500.00 1290.27 950.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 41.00 460.00 788.65 920.58 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 40.00 987.00 987.00 987.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 96.00 783.74 1153.96 985.81 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 151.00 895.39 1217.52 1222.63 =============== 202-00020 Rem CBC Each =================================================== NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 1.00 20000.00 19250.00 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 20000.00 19250.00 5000.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 3.00 18301.50 18301.50 18301.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 18301.50 18301.50 18301.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 18726.13 18843.50 14976.13 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 9 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00021 Rem Manhole Each =================================================== C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 10.00 2336.51 2336.51 2336.51 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 2336.51 2336.51 2336.51 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 1.00 5000.00 6208.33 2500.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 22.00 700.00 1095.35 1088.40 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 2.00 2313.15 2313.15 2313.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 25.00 1001.05 1286.47 1242.84 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 35.00 1382.61 1388.42 1555.32 =============== 202-00022 Rem Headgate Each =================================================== C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 1.00 1000.00 798.39 692.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1000.00 798.39 692.12 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1000.00 798.39 692.12 =============== 202-00023 Rem Emb Prot Ty 3 Each =================================================== ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 1.00 1200.00 880.01 1500.00 ER144A-002 SH 144 East and West of Goodr 03/08/18 1.00 550.00 2228.86 863.09 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 875.00 1554.44 1181.55 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 1.00 609.00 609.00 609.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 609.00 609.00 609.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 2.00 1172.59 1172.80 1172.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 1172.59 1172.80 1172.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 940.84 1480.14 1063.54 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 10 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00024 Rem Emb Prot Ty 5 Each =================================================== FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 2.00 500.00 1004.07 239.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 500.00 1004.07 239.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 500.00 1004.07 239.80 =============== 202-00026 Rem S and D Pave Sq Yard ================================================ BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 1,190.00 20.00 17.52 16.20 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 41.00 40.00 88.03 41.43 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 565.00 13.00 17.50 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,796.00 18.25 19.38 17.34 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 18.00 33.60 33.60 33.60 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 47.00 100.00 48.57 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 65.00 81.61 48.02 17.26 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 192.00 37.31 37.32 37.32 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 123.00 20.00 71.00 42.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 315.00 30.55 56.24 39.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,176.00 21.93 21.93 20.50 =============== 202-00027 Rem Riprap Sq Yard ================================================ SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 53.00 20.00 30.67 20.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 43.00 20.00 29.16 15.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 5.00 20.00 166.98 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 101.00 20.00 36.76 21.83 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 862.00 25.00 33.00 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 862.00 25.00 33.00 65.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 11 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00027 Rem Riprap Sq Yard ================================================ C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 160.00 14.70 14.70 14.70 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 30.00 63.00 48.55 35.00 STA052A-040 SH 52: Antelope Creek 08/23/18 14.00 50.00 54.17 31.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 204.00 24.23 39.46 18.80 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 1,135.00 20.00 34.17 40.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 900.00 10.66 10.66 10.66 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 1,561.00 45.00 52.92 18.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 740.00 20.48 20.48 20.48 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,336.00 27.14 43.13 22.66 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,503.00 26.57 41.79 29.13 =============== 202-00029 Rem Gabion Cubic Yard ============================================= NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 304.00 21.00 36.33 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 304.00 21.00 36.33 60.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 304.00 21.00 36.33 60.00 =============== 202-00031 Rem of Fire Hydrant Each =================================================== NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 2.00 3000.00 6000.00 6000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 3000.00 6000.00 6000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 3000.00 6000.00 6000.00 =============== 202-00032 Rem Valve Each =================================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 6289.35 6290.43 6290.43 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 6289.35 6290.43 6290.43 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 6289.35 6290.43 6290.43 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 12 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00033 Rem Pipe Each =================================================== NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 1.00 200.00 3507.90 7000.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 2.00 500.00 2601.72 700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 400.00 2782.96 2800.00 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 1.00 30.00 929.00 2200.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 1.00 1000.00 2266.67 1400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 515.00 1658.64 1800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 446.00 2384.01 2400.00 =============== 202-00035 Rem Pipe Lin Foot =============================================== STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 200.00 25.00 26.83 25.50 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 2,633.00 28.00 21.06 22.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 433.00 20.00 21.50 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,266.00 26.76 21.37 22.08 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 15.00 27.00 94.95 54.79 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 90.00 50.00 200.00 200.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 119.00 40.00 25.13 18.38 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 224.00 43.15 64.43 93.79 FBR060A-022 SH 60 over the South Platte 07/12/18 235.00 20.00 27.30 20.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 110.00 75.00 119.31 31.25 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 3,362.00 26.25 26.25 26.25 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 76.00 51.00 52.38 18.00 STA052A-040 SH 52: Antelope Creek 08/23/18 123.00 25.00 37.83 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,906.00 27.69 38.44 25.47 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 180.00 30.00 54.90 56.69 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 13 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00035 Rem Pipe Lin Foot =============================================== FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 598.00 22.00 25.24 25.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 101.00 30.00 62.14 33.00 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 70.00 30.00 58.78 27.56 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 437.00 25.00 23.12 9.49 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 863.00 67.16 67.17 67.17 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 47.00 25.00 83.00 100.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 89.00 25.00 52.43 26.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 366.00 25.00 42.80 25.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 6,693.00 15.00 18.62 11.49 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 15.00 67.00 85.14 75.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 4,487.00 26.25 26.25 26.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 13,946.00 23.25 24.43 21.83 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21,342.00 24.81 25.34 23.29 =============== 202-00036 Rem of Pipe (Spec) Lin Foot =============================================== ER052A-039 SH 170 11/15/18 365.00 35.00 43.59 44.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 365.00 35.00 43.59 44.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 365.00 35.00 43.59 44.00 =============== 202-00037 Rem of End Section Each =================================================== ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 2.00 500.00 631.56 150.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 69.00 350.00 245.57 200.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 34.00 300.00 383.38 313.41 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 105.00 336.67 282.94 235.77 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 1.00 385.00 437.50 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 385.00 437.50 200.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 13.00 264.60 264.60 264.60 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 14 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00037 Rem of End Section Each =================================================== BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 1.00 700.00 423.27 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 14.00 295.70 333.59 254.63 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 16.00 350.00 286.67 115.00 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 1.00 225.00 354.59 309.17 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 13.00 480.77 480.85 480.85 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 31.00 264.60 264.60 264.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 61.00 332.42 302.35 272.18 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 181.00 332.33 287.68 249.30 =============== 202-00039 Rem of Bollard Each =================================================== STM0252-469 R2 ADA RAMPS I-25 INT S NEV- 09/06/18 1.00 75.00 600.00 700.00 NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 1.00 160.00 1500.00 1500.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 1.00 100.00 200.50 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 111.67 500.29 783.33 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 1.00 160.00 346.37 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 160.00 346.37 200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 123.75 444.32 637.50 =============== 202-00060 Rem Trav Time Indicator Each =================================================== NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 1.00 650.00 468.33 750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 650.00 468.33 750.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 650.00 468.33 750.00 =============== 202-00090 Rem Delineator Each =================================================== STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 650.00 7.00 3.78 3.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 15 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00090 Rem Delineator Each =================================================== STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 440.00 7.00 5.97 5.25 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 10.00 10.00 6.75 10.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 100.00 10.00 58.88 123.00 STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 15.00 8.00 15.00 15.00 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 295.00 7.00 4.33 6.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 1,000.00 6.50 5.99 2.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 486.00 8.00 5.93 7.01 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,996.00 7.11 6.83 8.03 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 12.00 15.00 15.12 2.80 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 12.00 6.50 13.60 11.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 8.00 10.00 38.13 11.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 31.00 10.00 37.27 2.50 FSA0711-020 SH 71 & SH 94: PUNKIN CENTER 05/03/18 56.00 10.00 13.83 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 119.00 10.15 23.96 19.25 FBR060A-022 SH 60 over the South Platte 07/12/18 23.00 10.00 16.23 15.00 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 3.00 60.00 37.00 16.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 2.00 10.00 18.48 12.50 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 34.00 20.00 19.75 17.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 92.00 3.20 3.20 3.20 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 30.00 25.00 14.00 10.00 C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 9.00 15.00 106.25 165.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 26.00 21.00 4.21 2.00 STA052A-040 SH 52: Antelope Creek 08/23/18 1.00 25.00 54.33 180.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 206.00 9.00 5.02 5.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 8.00 7.00 12.47 10.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 33.00 6.50 10.87 5.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 8.00 10.00 64.00 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 475.00 10.66 11.89 9.90 NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 3.00 8.00 10.25 10.50 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 208.00 7.00 4.15 4.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 754.00 8.00 3.53 2.08 NHPP0702-366 I-70 Avon to Vail 11/08/18 80.00 7.00 5.17 5.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 16 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00090 Rem Delineator Each =================================================== NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 703.00 10.00 2.12 2.10 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 559.00 5.00 7.00 7.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 16.00 20.00 50.46 5.90 ER052A-039 SH 170 11/15/18 10.00 10.00 21.52 3.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 35.00 5.34 5.41 5.41 STA086A-051 SH 86; WEST OF I-70 11/29/18 416.00 5.50 2.32 2.25 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 395.00 5.00 4.07 4.02 C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 8.00 100.00 68.80 84.00 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 729.00 5.00 3.03 3.00 MPR200-252 REGION 2 - PUEBLO COUNTY HIGH 12/20/18 1.00 20.00 33.67 25.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 525.00 1.07 1.07 1.07 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,442.00 6.26 4.04 3.27 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,032.00 6.89 6.38 5.67 =============== 202-00120 Rem CBC Lin Foot =============================================== C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 859.00 32.55 32.55 32.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 859.00 32.55 32.55 32.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 859.00 32.55 32.55 32.55 =============== 202-00150 Rem Wall Each =================================================== ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 4.00 2500.00 8090.95 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 2500.00 8090.95 5000.00 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 4.00 5000.00 4585.71 9000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 5000.00 4585.71 9000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 3750.00 6647.62 7000.00 =============== 202-00155 Rem Wall Lin Foot =============================================== ER1151-033 PR SH 115-MP 34.7 01/25/18 14.00 40.00 273.53 300.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 17 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00155 Rem Wall Lin Foot =============================================== ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 47.00 50.00 127.84 36.54 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 150.00 30.00 182.00 64.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 211.00 35.12 163.47 73.54 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 13.00 56.00 399.83 94.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 60.00 60.00 200.00 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 73.00 59.29 312.95 181.12 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 36.00 64.52 40.52 40.52 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 170.00 40.00 32.00 35.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 18.00 125.00 225.17 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 224.00 50.77 53.30 39.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 508.00 45.49 114.55 73.82 =============== 202-00160 Rem Wall Sq Foot ================================================ FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 425.00 24.00 16.00 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 425.00 24.00 16.00 14.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 120.00 13.50 14.95 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 120.00 13.50 14.95 10.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 545.00 21.69 15.77 13.12 =============== 202-00165 Rem Wall LUMP SUM =============================================== FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 1.00 9000.00 59914.01 6958.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 9000.00 59914.01 6958.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 9000.00 59914.01 6958.75 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 18 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00170 Grinding And Texturing Conc Pvmt Sq Yard ================================================ STM0252-469 R2 ADA RAMPS I-25 INT S NEV- 09/06/18 150.00 32.00 106.50 175.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 150.00 32.00 106.50 175.00 MTCE0253-267 MTCE R4 FY19 I25 CONCRETE PAN 12/13/18 300.00 25.00 28.93 62.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 400.00 22.44 22.44 22.44 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 700.00 23.54 27.30 39.39 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 850.00 25.03 39.81 63.32 =============== 202-00190 Rem of Conc Median Cover Matl Sq Yard ================================================ STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 159.00 15.00 29.13 44.50 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 355.00 24.00 18.25 6.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 514.00 21.22 23.39 18.25 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 2.00 17.00 122.84 61.36 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 17.00 122.84 61.36 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 146.00 22.00 12.63 15.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 120.00 30.00 24.67 25.00 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 71.00 18.00 26.20 20.00 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 5.00 50.00 67.14 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 342.00 24.39 21.00 20.06 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 858.00 22.47 22.26 19.07 =============== 202-00195 Rem of Median Cover Sq Yard ================================================ STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 23.00 20.00 197.25 200.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 19 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00195 Rem of Median Cover Sq Yard ================================================ STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 5.00 5.50 75.00 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 28.00 17.41 167.19 169.64 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 2,144.00 20.00 11.23 7.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,144.00 20.00 11.23 7.50 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 342.00 24.00 26.75 22.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 28.00 35.00 52.50 42.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 370.00 24.83 28.70 23.51 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 86.00 19.19 19.19 19.19 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 17.00 15.00 62.90 38.70 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 618.00 10.00 22.99 10.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 612.00 25.00 24.73 18.28 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,333.00 17.54 24.30 14.76 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,875.00 19.60 16.45 12.70 =============== 202-00200 Rem Sidewalk Sq Yard ================================================ STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 63.00 20.00 387.50 350.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 72.00 35.00 23.33 15.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 47.00 30.00 26.31 20.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 106.00 25.00 34.50 33.00 STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 134.00 26.00 30.00 15.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 398.00 18.00 29.12 25.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 36.00 20.00 35.94 17.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 515.00 25.00 14.25 6.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,371.00 23.40 34.63 31.72 STAR400-347 Various intersections across 04/12/18 34.00 50.00 89.80 79.41 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 20 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00200 Rem Sidewalk Sq Yard ================================================ NH0242-071 US 24 & 31ST STREET and US24 05/03/18 413.00 17.00 13.88 10.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 896.00 15.00 31.38 51.50 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 922.00 40.00 35.00 35.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 2.00 25.00 110.00 115.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,267.00 26.07 26.64 37.70 NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 461.00 25.00 50.00 50.00 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 84.00 25.00 28.33 30.00 C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 808.00 22.50 24.00 10.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 460.00 13.00 17.92 16.00 M850-027 US24E MANITOU AVE. AT RUXTON 08/28/18 30.00 40.00 76.71 43.00 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 1,959.00 20.00 30.25 18.00 STM0252-469 R2 ADA RAMPS I-25 INT S NEV- 09/06/18 919.00 14.00 20.15 12.30 NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 840.00 25.00 50.00 50.00 NHPP070A-032 I-70B & Z GRAND JCT PHASE 1 A 09/20/18 815.00 50.00 132.00 27.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6,376.00 23.96 37.78 23.98 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 1.00 20.00 650.00 700.00 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 158.00 30.00 13.00 15.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 221.00 20.00 21.87 10.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 254.00 15.00 42.53 50.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 20.00 100.00 81.83 65.00 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 226.00 32.00 70.00 70.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 156.00 20.26 20.25 20.25 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 975.00 15.00 34.68 25.80 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 570.00 17.00 28.80 50.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 534.00 20.00 36.17 10.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 5.00 150.00 311.36 274.08 C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 730.00 25.00 20.70 20.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 10,163.00 9.00 8.51 14.67 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 450.00 25.00 16.89 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 14,463.00 12.59 14.80 18.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 24,477.00 17.41 21.53 22.41 =============== 202-00201 Rem Curb Lin Foot =============================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 20.00 30.00 31.25 30.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 21 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00201 Rem Curb Lin Foot =============================================== STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 101.00 7.00 13.06 10.00 ER1151-033 PR SH 115-MP 34.7 01/25/18 1,278.00 13.00 7.94 12.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 376.00 5.00 12.60 8.53 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 421.00 13.00 8.25 6.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 550.00 13.00 9.00 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,746.00 11.81 9.48 9.46 STAR400-347 Various intersections across 04/12/18 5.50 50.00 191.60 466.81 NHPP0703-436 EJMT PLENUM WATERPROOFING MEM 06/28/18 750.00 19.00 53.50 67.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 755.50 19.23 55.00 69.91 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 44.00 25.00 94.00 94.00 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 101.00 6.00 22.40 10.00 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 702.00 12.00 21.50 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 847.00 11.96 23.37 20.99 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,348.50 13.13 16.14 22.21 =============== 202-00202 Rem Gutter Lin Foot =============================================== BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 16.00 30.00 27.17 23.83 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16.00 30.00 27.17 23.83 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 94.00 20.00 35.00 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 94.00 20.00 35.00 35.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 108.00 15.00 18.31 16.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 22 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00202 Rem Gutter Lin Foot =============================================== STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 20.00 26.00 37.40 100.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 285.00 14.00 17.82 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 413.00 14.84 18.99 15.93 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 523.00 16.23 20.09 19.60 =============== 202-00203 Rem Curb and Gutter Lin Foot =============================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 329.00 10.00 35.19 20.38 STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 738.00 5.00 31.25 30.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 2,510.00 8.50 4.67 3.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 291.00 10.00 7.95 7.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 7,783.00 10.00 6.50 7.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 1,544.00 8.00 12.34 2.59 STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 223.00 12.50 12.33 11.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 1,134.00 8.00 11.27 8.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 2,161.00 13.00 11.00 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16,713.00 9.65 9.08 7.39 STAR400-347 Various intersections across 04/12/18 25.50 20.00 81.41 119.22 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 4,462.00 10.00 6.27 3.50 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 497.00 9.00 17.08 15.34 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 1,483.00 12.00 45.00 45.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 21.00 10.00 21.34 11.01 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6,488.50 10.42 9.09 14.37 NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 272.00 12.00 35.00 35.00 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 238.00 12.00 8.25 9.00 C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 928.00 10.00 14.50 10.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 605.00 8.00 14.59 10.00 M850-027 US24E MANITOU AVE. AT RUXTON 08/28/18 52.00 20.00 34.22 43.00 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 2,862.00 10.00 14.50 12.00 STM0252-469 R2 ADA RAMPS I-25 INT S NEV- 09/06/18 919.00 14.00 17.15 16.30 NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 1,072.00 50.00 35.00 35.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 108.00 17.00 16.75 14.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 23 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00203 Rem Curb and Gutter Lin Foot =============================================== NHPP070A-032 I-70B & Z GRAND JCT PHASE 1 A 09/20/18 890.00 25.00 37.75 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7,946.00 17.68 17.72 16.37 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 130.00 8.00 14.50 9.00 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 478.00 12.00 8.72 6.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 2,381.00 7.00 10.66 7.50 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 496.00 25.00 12.38 11.00 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 507.00 35.00 50.00 50.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1,603.00 7.47 7.47 7.47 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 1,087.00 8.00 15.72 9.38 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 1,540.00 10.00 14.40 15.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 1,449.00 12.00 15.05 8.00 C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 1,101.00 13.00 12.10 12.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 17,547.00 5.00 4.72 6.41 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 31.00 15.00 28.57 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 28,350.00 7.39 8.02 8.31 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 59,497.50 9.73 9.41 9.79 =============== 202-00204 Rem C, G and Sidewalk Lin Foot =============================================== NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 59.00 35.00 125.00 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 59.00 35.00 125.00 125.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 209.00 25.00 18.86 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 209.00 25.00 18.86 15.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 268.00 27.20 25.85 39.22 =============== 202-00206 Rem Conc Curb Ramp Sq Yard ================================================ STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 82.00 50.00 447.50 400.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 17.00 45.00 28.97 15.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 24 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00206 Rem Conc Curb Ramp Sq Yard ================================================ STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 30.00 35.00 31.63 14.50 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 268.00 25.00 32.84 30.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 164.00 45.00 25.00 24.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 561.00 35.64 55.71 81.04 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 652.00 20.00 42.33 49.31 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 652.00 20.00 42.33 49.31 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 51.00 30.00 28.63 31.00 STM0252-469 R2 ADA RAMPS I-25 INT S NEV- 09/06/18 1,098.00 22.00 24.00 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,149.00 22.36 24.21 20.49 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 23.00 40.00 55.00 30.00 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 72.00 35.00 16.43 14.75 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 109.00 40.00 60.00 60.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 85.00 20.26 20.25 20.25 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 1,191.00 20.00 37.02 30.49 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 173.00 28.00 25.67 10.00 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 13.00 35.00 53.14 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,666.00 23.19 35.09 28.88 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,028.00 24.17 38.86 37.06 =============== 202-00207 Rem of Brick Pavers Sq Yard ================================================ NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 12.00 50.00 100.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.00 50.00 100.00 100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 50.00 100.00 100.00 =============== 202-00210 Rem Conc Pavement Sq Yard ================================================ FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 119.00 25.00 53.19 31.37 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 25 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00210 Rem Conc Pavement Sq Yard ================================================ STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 44.00 50.00 125.00 120.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 954.00 13.00 15.41 20.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 1,000.00 12.00 55.86 37.56 STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 4.00 25.00 110.33 95.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 421.00 50.00 42.20 25.00 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 263.00 26.00 36.50 22.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 210.00 30.00 29.86 10.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 2,571.00 35.00 35.00 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,586.00 27.54 38.34 26.62 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 20.00 35.00 67.00 150.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 481.00 50.00 50.00 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 501.00 49.40 51.89 53.99 NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 178.00 50.00 50.00 50.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 1,890.00 25.00 14.92 14.50 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 1,980.00 14.70 14.70 14.70 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 9.00 75.00 139.47 135.00 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 101.00 20.00 57.85 61.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 247.00 20.00 37.79 30.00 M850-027 US24E MANITOU AVE. AT RUXTON 08/28/18 58.00 45.00 49.24 40.00 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 143.00 30.00 39.50 22.00 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 43.00 25.00 41.00 41.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,649.00 21.70 19.25 18.81 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 205.00 20.00 30.44 16.90 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 60.00 80.00 64.33 43.00 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 114.00 50.00 75.00 75.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 597.00 23.46 23.46 23.46 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 356.00 20.00 46.72 30.49 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 745.00 12.00 38.40 50.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 946.00 20.00 26.90 10.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 43,485.00 10.00 9.26 10.50 MTCE0253-267 MTCE R4 FY19 I25 CONCRETE PAN 12/13/18 2,948.00 25.00 59.73 42.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 13,929.00 6.91 6.91 6.91 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 63,385.00 10.54 13.28 12.03 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 74,121.00 12.79 15.96 13.84 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 26 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00215 Rem Conc Pvmt (Planing) Sq Yard ================================================ BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 3,914.00 8.00 13.19 18.18 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,914.00 8.00 13.19 18.18 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,914.00 8.00 13.19 18.18 =============== 202-00217 Rem Conc Pvmt (Planing) (Spec) Sq Yard ================================================ BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 6,511.00 16.00 44.76 9.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6,511.00 16.00 44.76 9.95 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 9,719.00 30.00 17.25 17.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9,719.00 30.00 17.25 17.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16,230.00 24.38 36.53 14.47 =============== 202-00220 Rem Asphalt Mat Sq Yard ================================================ FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 192.00 15.00 55.08 25.15 STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 566.00 12.00 43.63 30.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 3,993.00 7.00 8.83 4.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 500.00 8.00 10.46 11.50 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 3,810.00 7.00 12.20 13.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 4,993.00 6.00 10.48 15.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR NHPP0702-373 I-70 GWC Longitudinal Joint R 01/11/18 317.00 10.00 22.00 19.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 8,191.00 8.00 8.19 5.25 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 65.00 25.00 60.40 90.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 59.00 7.50 53.34 30.17 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 1,306.00 8.00 8.14 5.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 13,619.00 6.50 10.89 9.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 23,476.00 5.00 3.36 1.46 NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 156.00 15.00 9.88 4.67 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 407.00 18.00 16.97 5.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 739.00 5.00 27.40 14.80 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 3,573.00 5.46 9.00 9.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 27 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00220 Rem Asphalt Mat Sq Yard ================================================ NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 1,607.00 12.00 15.00 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 67,569.00 6.48 7.04 6.66 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 1,235.00 7.00 28.56 22.00 STAR400-347 Various intersections across 04/12/18 19.00 35.00 94.33 105.00 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 2,644.00 13.00 11.75 13.50 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 92.00 40.00 27.98 8.80 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 1,796.08 40.00 20.05 24.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 11.00 20.00 91.09 34.35 FBR0705-087 I-70: EMERGENCY BRIDGE G-25-K 05/16/18 9,300.00 3.00 3.00 3.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 721.00 15.00 20.00 20.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 230.00 12.50 17.04 12.61 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16,048.08 10.03 15.94 9.62 NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 30.00 30.00 40.00 40.00 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 494.00 15.00 46.68 16.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 531.00 10.00 18.88 7.50 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 10,311.00 6.50 7.96 8.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 9,162.00 11.42 11.42 11.42 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 19.00 35.00 87.63 99.00 C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 100.00 20.00 30.25 12.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 14,461.00 6.00 4.73 5.00 STA052A-040 SH 52: Antelope Creek 08/23/18 666.00 7.50 9.46 5.25 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 1,720.00 8.00 13.14 5.00 M850-027 US24E MANITOU AVE. AT RUXTON 08/28/18 231.00 10.00 39.97 45.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 288.00 13.00 18.46 20.00 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 456.00 12.00 24.50 20.00 NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 179.00 30.00 30.00 30.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 6,821.00 7.00 6.09 8.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 25.00 50.00 57.00 46.00 NHPP070A-032 I-70B & Z GRAND JCT PHASE 1 A 09/20/18 30.00 30.00 52.13 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 45,524.00 7.91 7.09 8.27 BR1131-006 SH 113 AT MP 11.5 10/11/18 1,092.00 5.75 9.09 5.00 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 16.00 100.00 55.00 35.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 18,265.00 4.00 5.12 3.17 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 28 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00220 Rem Asphalt Mat Sq Yard ================================================ FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 10,690.00 6.00 8.38 5.65 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 430.00 5.00 16.01 12.50 NHPP0702-366 I-70 Avon to Vail 11/08/18 254.00 20.00 41.03 50.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 27,022.00 10.00 6.53 8.05 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 636.00 40.00 21.62 21.24 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 1,095.00 8.00 12.83 12.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 1,317.00 6.00 13.46 7.15 ER052A-039 SH 170 11/15/18 132.00 8.00 17.80 6.00 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 198.00 55.00 50.00 50.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 15,529.00 17.06 17.06 17.06 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 567.00 7.00 26.44 10.64 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 3,120.00 5.00 15.20 20.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 85.00 15.00 41.03 16.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 1,103.00 19.50 15.47 20.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 22,076.00 8.00 8.87 2.50 C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 120.00 32.00 41.00 20.00 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 250.00 15.00 10.89 13.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 24,098.00 4.00 4.29 1.50 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 69,177.00 8.41 8.41 8.41 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 197,272.00 8.34 8.10 7.31 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 326,413.08 7.98 7.70 7.42 =============== 202-00222 Removal of Detour Pavement Sq Yard ================================================ ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 910.00 12.14 14.00 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 910.00 12.14 14.00 14.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 910.00 12.14 14.00 14.00 =============== 202-00226 Rem of Asph Mat (Special) Sq Yard ================================================ IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 90.00 25.00 76.18 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 90.00 25.00 76.18 35.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 90.00 25.00 76.18 35.00 =============== 202-00240 Rem Asphalt Mat (Planing) Sq Yard ================================================ STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 5,364.00 10.00 4.79 8.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 29 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00240 Rem Asphalt Mat (Planing) Sq Yard ================================================ STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 62,453.00 2.50 5.05 3.50 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 2,589.00 6.75 3.83 4.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 23,425.00 3.00 2.00 1.75 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 325,753.00 2.00 1.86 1.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 34,411.00 2.20 1.87 1.50 STA0342-060 US 34D OVERLAY AND BRIDGE WOR NHPP0702-373 I-70 GWC Longitudinal Joint R 01/11/18 9,849.00 5.00 11.00 11.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 148,439.00 3.00 2.96 2.50 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 2,380.00 6.00 9.35 3.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 4,965.00 6.00 6.05 5.86 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 19,029.00 5.00 2.74 3.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 245,889.00 3.50 2.23 2.50 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 7,692.00 10.00 3.71 3.68 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 6,433.00 4.00 4.75 5.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 7,697.00 8.00 4.75 4.49 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 810.00 10.00 6.75 8.50 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 1,689.00 5.00 14.55 15.64 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 908,867.00 2.97 2.45 2.21 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 3,646.00 5.00 5.06 10.00 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 4,962.00 2.30 3.04 3.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 2,445.00 7.00 5.59 5.62 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 171,225.00 2.75 1.73 1.40 FSA0711-020 SH 71 & SH 94: PUNKIN CENTER 05/03/18 1,270.00 7.00 9.00 8.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 196,507.00 2.40 2.27 2.42 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 125.00 26.00 96.00 51.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 380,180.00 2.63 2.19 2.10 FBR060A-022 SH 60 over the South Platte 07/12/18 25,615.00 6.50 4.03 4.00 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 210.00 8.00 49.02 13.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 565.00 15.00 11.23 8.55 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 136,382.00 1.69 1.69 1.69 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 2,655.00 6.00 5.39 7.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 34,537.00 3.00 3.36 4.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 5,691.00 6.00 6.02 5.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 2,200.00 2.30 4.27 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 207,855.00 2.72 3.73 2.59 BR1131-006 SH 113 AT MP 11.5 10/11/18 2,705.00 3.50 4.10 3.57 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 30 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00240 Rem Asphalt Mat (Planing) Sq Yard ================================================ NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 37,840.00 2.00 2.68 2.60 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 2,528.00 2.75 7.58 9.48 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 346,716.00 1.50 2.05 1.96 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 17,109.00 3.50 3.98 2.30 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 12,331.00 3.25 3.71 3.15 NHPP0702-366 I-70 Avon to Vail 11/08/18 351,363.00 2.35 2.75 2.20 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 690,855.00 4.60 2.42 1.49 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 7,442.00 3.00 5.50 3.99 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 919.00 16.00 29.32 28.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 3,835.00 4.00 8.00 8.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 773.00 5.00 7.55 7.57 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 2,000.00 12.73 11.67 11.67 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 188,586.00 3.00 2.53 2.12 STA086A-051 SH 86; WEST OF I-70 11/29/18 3,505.00 3.50 6.22 4.50 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 311,010.00 2.00 1.96 1.90 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 4,883.00 10.00 4.82 3.59 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 217,955.00 1.50 1.73 2.10 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 2,110.00 10.00 5.36 6.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 87,535.00 2.30 1.51 0.41 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 261,238.00 2.88 2.88 2.88 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,553,238.00 2.88 2.37 1.99 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,050,140.00 2.87 2.44 2.08 =============== 202-00246 Rem Asphalt Mat (Planing)(Special) Sq Yard ================================================ ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 2,730.00 4.00 7.66 10.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 2,571.00 12.00 20.70 6.50 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 3,058.00 12.00 14.40 24.96 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 151.00 30.00 30.45 40.00 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 3,557.00 10.00 25.82 36.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12,067.00 9.83 16.44 21.22 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 1,323.00 6.00 13.48 11.92 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,323.00 6.00 13.48 11.92 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 2,785.00 8.43 8.43 8.43 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 31 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00246 Rem Asphalt Mat (Planing)(Special) Sq Yard ================================================ STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 1,309.00 7.00 15.73 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,094.00 7.97 13.19 12.77 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 1,056.00 10.00 21.50 10.21 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 3,444.00 16.00 15.42 13.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 839.00 8.00 16.99 11.50 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 6,203.00 13.00 3.71 5.40 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 78,524.00 3.00 1.99 2.10 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 27,729.00 8.40 8.40 8.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 117,795.00 5.28 3.60 4.22 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 135,279.00 5.77 5.50 6.07 =============== 202-00248 Rem Rumble Strips Lin Foot =============================================== FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 1,300.00 10.00 4.48 3.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 3,425.00 10.00 3.15 0.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,725.00 10.00 3.44 1.12 FSA0711-020 SH 71 & SH 94: PUNKIN CENTER 05/03/18 180.00 10.00 17.00 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 180.00 10.00 17.00 16.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 56,000.00 2.74 2.74 2.74 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 56,000.00 2.74 2.74 2.74 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 53,033.00 2.73 2.73 2.73 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 53,033.00 2.73 2.73 2.73 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 113,938.00 3.05 2.94 2.69 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 32 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00250 Rem Pavement Marking Sq Foot ================================================ FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 144.00 6.00 9.65 4.30 STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 11,762.00 3.00 1.81 2.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 650.00 5.00 5.00 5.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 100,317.00 1.00 0.83 0.90 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 38,909.00 1.40 0.96 1.05 MTCE0712-017 SH 71 CHIP SEAL MP 123 TO MP 01/18/18 71,051.00 0.75 0.94 0.69 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 27,500.00 2.00 1.32 0.75 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 18,415.00 1.00 0.84 0.82 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 13,277.00 2.00 1.31 1.20 STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 746.00 4.00 5.65 5.45 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 8,806.00 2.00 1.19 1.10 NHPP5502-096 US550 STRIPING & RUMBLE STRIP 03/01/18 78,000.00 0.80 0.66 0.60 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 1,001.00 1.00 4.10 3.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 64,000.00 1.00 0.75 0.60 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 918.00 4.00 2.54 2.08 MTCER300-245 MTCE R3 FY 18/19 REGIONWIDE E 03/29/18 948,153.00 0.55 0.50 0.42 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 9,700.00 0.55 1.05 1.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,393,349.00 0.74 0.64 0.55 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 1,458.00 4.00 2.92 4.40 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 13,560.00 0.75 1.92 1.75 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 28,000.00 1.50 0.72 0.77 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 1,100.00 5.00 4.10 4.10 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 120.00 5.00 5.95 5.75 MPR200-251 R2 FY19 PAVEMENT MARKING 06/21/18 1,500.00 0.40 0.60 0.46 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 45,738.00 1.41 1.32 1.26 MTCE R100-313 R1 FY19/20 REGIONWIDE PAVEMEN 07/05/18 3,519,622.00 0.50 0.43 0.41 NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 752.00 3.50 5.00 5.00 FBR060A-022 SH 60 over the South Platte 07/12/18 5,100.00 2.00 1.64 1.25 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 3,489.00 5.00 6.28 6.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 1,270.00 3.00 4.87 3.61 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 440.00 6.50 2.81 2.10 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 99,094.00 1.41 1.41 1.41 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 10,640.00 2.50 2.23 2.15 C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 950.00 4.00 4.24 4.35 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 7,500.00 2.00 1.33 1.27 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 33 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00250 Rem Pavement Marking Sq Foot ================================================ NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 1,886.00 0.75 3.19 3.00 NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 743.00 3.50 6.00 6.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 157.00 6.00 7.38 7.50 NHPP070A-032 I-70B & Z GRAND JCT PHASE 1 A 09/20/18 220.00 3.50 5.38 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,651,863.00 0.54 0.50 0.46 NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 1,976.00 3.50 2.38 1.75 BR1131-006 SH 113 AT MP 11.5 10/11/18 720.00 4.00 3.21 2.22 MTCER400-365 REGION 4 FY 19 EPOXY 1 10/18/18 1,221,334.00 0.49 0.48 0.42 SHER200-243 R2 WRONG WAY PREVENTION 10/18/18 8,483.00 1.90 2.23 1.95 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 42,808.00 0.70 0.73 0.60 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 1,000.00 3.00 3.29 4.20 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 614.00 2.00 4.12 3.15 NHPP0702-366 I-70 Avon to Vail 11/08/18 57,425.00 1.00 0.66 0.65 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 115,618.00 0.95 0.52 0.53 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 8,700.00 3.50 2.92 3.50 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 3,500.00 2.30 2.88 2.36 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 23,547.00 1.73 1.77 1.77 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 2,466.00 0.80 3.45 5.00 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 1,330.00 1.00 2.35 2.70 STA086A-051 SH 86; WEST OF I-70 11/29/18 77,762.00 1.00 0.65 0.45 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 80,618.00 0.75 0.60 0.55 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 136,000.00 1.30 0.65 0.60 C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 525.00 4.00 3.93 4.40 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 18,000.00 2.00 1.92 1.98 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 90.00 0.75 5.96 6.00 STAR100-279 FY20 HMA PREVENTATIVE MAINTEN 12/13/18 120,000.00 0.70 0.89 1.05 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 197,625.00 0.91 0.91 0.91 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,120,141.00 0.72 0.62 0.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,211,091.00 0.64 0.59 0.52 =============== 202-00251 Rem Pvmt Marking (Asph Grooving) Sq Foot ================================================ MPR200-251 R2 FY19 PAVEMENT MARKING 06/21/18 1,750,023.00 0.30 0.49 0.46 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,750,023.00 0.30 0.49 0.46 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,750,023.00 0.30 0.49 0.46 =============== 202-00252 Rem Pvmt Marking (Conc Grooving) Sq Foot ================================================ MPR200-251 R2 FY19 PAVEMENT MARKING 06/21/18 90,969.00 1.00 0.60 0.46 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 90,969.00 1.00 0.60 0.46 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 90,969.00 1.00 0.60 0.46 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 34 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00254 Rem of Pvmt Mkg (12 In) Sq Foot ================================================ NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 1,000.00 1.50 1.05 1.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,000.00 1.50 1.05 1.10 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 14,000.00 1.50 0.68 0.66 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 14,000.00 1.50 0.68 0.66 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15,000.00 1.50 0.69 0.69 =============== 202-00256 Rem of Pvmt Mkg (15 In) Sq Foot ================================================ NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 1,000.00 2.00 1.05 1.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,000.00 2.00 1.05 1.10 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 12,500.00 1.50 0.68 0.66 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12,500.00 1.50 0.68 0.66 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13,500.00 1.54 0.69 0.69 =============== 202-00260 Rem of Pvmt Mkg (On-Call) Sq Foot ================================================ MTCER300-245 MTCE R3 FY 18/19 REGIONWIDE E 03/29/18 74,000.00 0.60 0.54 0.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 74,000.00 0.60 0.54 0.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 74,000.00 0.60 0.54 0.42 =============== 202-00300 Rem Bldg(s) LUMP SUM =============================================== C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 1.00 5000.00 4425.42 2658.37 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 5000.00 4425.42 2658.37 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5000.00 4425.42 2658.37 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 35 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00400 Rem Bridge Each =================================================== CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 2.00 104442.30 154800.00 154800.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 1.00 28000.00 40593.36 9000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 78961.53 63434.69 106200.00 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 1.00 50000.00 69648.60 131798.95 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 1.00 80000.00 50655.56 38000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 65000.00 63317.59 84899.48 FBR060A-022 SH 60 over the South Platte 07/12/18 1.00 250000.00 227361.18 90000.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 2.00 80000.00 97497.81 90000.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 1.00 100000.00 127071.71 95000.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 1.00 100000.00 288884.16 300000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 122000.00 174910.36 133000.00 BR1131-006 SH 113 AT MP 11.5 10/11/18 1.00 15000.00 60155.42 25305.56 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 227956.26 214811.80 214811.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 121478.13 74215.09 120058.68 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 101653.41 129604.59 116126.36 =============== 202-00405 Rem of Pilling Each =================================================== FBR060A-022 SH 60 over the South Platte 07/12/18 6.00 1000.00 1094.40 275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 1000.00 1094.40 275.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 1000.00 1094.40 275.00 =============== 202-00425 Rem Bridge Railing Lin Foot =============================================== STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 263.00 30.00 19.33 20.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 36 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00425 Rem Bridge Railing Lin Foot =============================================== ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 1,629.00 35.00 12.08 4.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 1,294.00 30.00 85.38 40.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 1,465.00 30.00 86.32 60.09 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 801.00 25.00 13.26 15.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 1,082.00 30.00 17.20 25.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 120.00 50.00 61.50 58.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6,654.00 30.98 49.08 29.70 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 73.00 40.00 31.66 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 73.00 40.00 31.66 22.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 961.00 40.00 19.90 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 961.00 40.00 19.90 15.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 96.00 45.00 42.04 41.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 88.00 20.00 29.14 28.93 STA086A-051 SH 86; WEST OF I-70 11/29/18 950.00 35.00 22.23 75.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 278.00 20.00 16.65 13.83 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,412.00 31.79 22.66 57.77 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,100.00 32.13 42.23 32.44 =============== 202-00426 Rem Bridge Railing (Spec) Lin Foot =============================================== BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 1,498.00 41.10 83.48 64.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,498.00 41.10 83.48 64.75 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 1,852.00 20.00 5.81 4.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,852.00 20.00 5.81 4.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,350.00 29.44 51.32 31.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 37 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00450 Rem Port Present Str (1) Sq Yard ================================================ FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 188.00 200.00 181.48 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 188.00 200.00 181.48 120.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 52.00 170.00 233.97 147.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 52.00 170.00 233.97 147.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 240.00 193.50 188.95 125.85 =============== 202-00453 Rem Port Present Str (2) Sq Yard ================================================ STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 35.00 300.00 281.51 280.00 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 139.00 250.00 231.18 225.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 208.00 270.10 236.80 153.85 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 148.00 250.00 274.26 278.78 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 188.00 250.00 236.27 165.00 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 363.00 300.00 299.99 253.96 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,081.00 272.28 257.24 219.74 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 79.00 230.00 457.01 378.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 79.00 230.00 457.01 378.05 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 467.00 220.00 316.77 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 467.00 220.00 316.77 300.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 52.00 250.00 330.40 237.30 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 189.00 240.00 289.08 202.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 43.00 300.00 337.83 320.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 38 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00453 Rem Port Present Str (2) Sq Yard ================================================ ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 417.00 300.00 270.29 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 701.00 280.11 281.06 174.98 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,328.00 262.72 280.62 227.73 =============== 202-00458 Rem Port Pres Str (Hydrodem)(Fast-Track) Sq Yard ================================================ ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 2,730.00 95.00 87.08 50.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,730.00 95.00 87.08 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,730.00 95.00 87.08 50.00 =============== 202-00460 Rem Port Present Str (3) Sq Yard ================================================ ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 239.00 325.00 431.39 220.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 30.00 325.00 419.63 650.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 34.00 400.00 607.58 325.59 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 71.00 325.00 427.47 450.00 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 102.00 650.00 493.58 465.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 476.00 400.00 457.15 341.61 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 16.00 490.00 1156.32 575.29 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16.00 490.00 1156.32 575.29 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 131.00 500.00 494.32 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 131.00 500.00 494.32 400.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 12.00 450.00 611.33 420.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 39 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00460 Rem Port Present Str (3) Sq Yard ================================================ NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 39.00 480.00 471.67 400.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 8.00 600.00 767.37 875.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 74.00 550.00 434.04 220.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 133.00 523.46 484.83 330.23 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 756.00 440.95 480.72 354.67 =============== 202-00480 Rem Port Present Str (Special) Sq Yard ================================================ ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 52.00 400.00 282.71 210.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 52.00 400.00 282.71 210.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 52.00 400.00 282.71 210.00 =============== 202-00495 Rem Port Present Str LUMP SUM =============================================== FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 1.00 10000.00 55112.08 12500.00 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 1.00 1000.00 12063.43 1516.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 5500.00 38968.84 7008.15 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 1.00 80000.00 51461.46 35200.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 1.00 80000.00 158375.00 168500.00 NHPP0761-230 I-76 AND COUNTY ROAD 22 AT FO 06/14/18 1.00 12000.00 57949.00 23500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 57333.33 77382.54 75733.33 FBR060A-022 SH 60 over the South Platte 07/12/18 1.00 5000.00 10996.29 4465.00 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 1.00 3500.00 11217.76 5675.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 4000.00 11084.88 5271.67 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 1.00 3000.00 6147.53 8085.22 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 40 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00495 Rem Port Present Str LUMP SUM =============================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 185686.83 197923.27 197923.27 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 1.00 10000.00 16400.00 5000.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 1.00 25000.00 27126.72 37122.86 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 55921.71 24311.69 62032.84 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 34890.57 36936.63 42096.89 =============== 202-00500 Rem Port Present Str Each =================================================== STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 12.00 200.00 1262.02 1270.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12.00 200.00 1262.02 1270.00 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 19.00 1000.00 1069.12 1300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 19.00 1000.00 1069.12 1300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 31.00 690.32 1143.79 1288.39 =============== 202-00502 Rem Port Present Str Cubic Yard ============================================= NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 2.00 1500.00 2709.67 2835.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 16.00 200.00 1421.40 170.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 18.00 344.44 1531.82 466.11 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18.00 344.44 1531.82 466.11 =============== 202-00503 Rem Port Present Str Sq Yard ================================================ STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 2.00 500.00 6742.50 7000.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 239.00 100.00 92.44 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 241.00 103.32 114.62 132.47 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 190.00 750.00 30.67 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 190.00 750.00 30.67 45.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 41 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00503 Rem Port Present Str Sq Yard ================================================ NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 1.00 500.00 4321.29 8323.88 NHPP0702-366 I-70 Avon to Vail 11/08/18 4.00 1500.00 2180.01 2175.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 266.00 120.00 178.17 125.00 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 2.00 100.00 2796.50 593.00 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 92.00 500.00 164.60 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 365.00 231.84 201.59 178.79 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 796.00 316.61 149.17 132.83 =============== 202-00504 Rem Exp Device Lin Foot =============================================== ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 275.00 150.00 188.74 125.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 133.00 220.00 178.98 200.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 1,946.00 170.00 162.51 122.31 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 118.00 220.00 204.89 54.67 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 103.00 220.00 184.69 300.00 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 98.00 300.00 234.47 275.41 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,673.00 179.33 169.13 135.93 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 84.00 200.00 200.68 180.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 84.00 200.00 200.68 180.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 622.00 190.00 49.47 49.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 170.00 160.00 163.98 203.70 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 239.00 150.00 253.33 200.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 88.00 175.00 247.66 165.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,119.00 175.72 141.28 113.88 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,876.00 178.74 163.49 130.52 =============== 202-00505 Rem Port of Present Structure Sq Foot ================================================ ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 2,195.00 65.00 44.60 35.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 42 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00505 Rem Port of Present Structure Sq Foot ================================================ STA0342-060 US 34D OVERLAY AND BRIDGE WOR -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,195.00 65.00 44.60 35.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 110.00 150.00 174.47 112.00 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 298.00 35.50 117.04 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 408.00 66.37 134.67 212.79 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,603.00 65.21 59.35 62.87 =============== 202-00506 Removal of Waterproofing Membrane Sq Yard ================================================ NHPP0703-436 EJMT PLENUM WATERPROOFING MEM 06/28/18 2,644.00 28.00 66.50 47.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,644.00 28.00 66.50 47.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,644.00 28.00 66.50 47.00 =============== 202-00514 Removal of De-icing System LUMP SUM =============================================== NHPP0702-366 I-70 Avon to Vail 11/08/18 1.00 10000.00 76058.05 32000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 10000.00 76058.05 32000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 10000.00 76058.05 32000.00 =============== 202-00520 Rem of Exp Joint Matl Lin Foot =============================================== STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 40.00 60.00 12.41 12.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 40.00 60.00 12.41 12.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 60.00 12.41 12.50 =============== 202-00700 Rem Light Standard Each =================================================== SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 1.00 300.00 328.33 330.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 43 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00700 Rem Light Standard Each =================================================== BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 15.00 545.00 334.81 347.72 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16.00 529.69 334.63 346.61 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 1.00 500.00 545.25 750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 500.00 545.25 750.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 5.00 618.90 617.33 617.33 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 53.00 500.00 628.60 771.38 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 1.00 373.00 591.67 555.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 55.00 807.45 807.45 807.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 114.00 652.43 663.76 780.13 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 131.00 636.28 570.68 726.95 =============== 202-00705 Rem Light Standard Foundation Each =================================================== SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 5.00 500.00 303.33 310.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 13.00 545.00 777.59 1274.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 18.00 532.50 710.48 1006.91 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 3.00 500.00 561.68 671.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 500.00 561.68 671.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 2.00 750.00 1080.12 975.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 5.00 724.69 722.85 722.85 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 1.00 200.00 843.10 810.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 55.00 807.45 807.45 807.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 63.00 789.42 833.85 806.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 84.00 724.03 753.90 844.30 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 44 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00710 Rem Power Pole Each =================================================== NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 5.00 500.00 611.23 700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 500.00 611.23 700.00 FSA0711-020 SH 71 & SH 94: PUNKIN CENTER 05/03/18 2.00 850.00 1083.33 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 850.00 1083.33 1500.00 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 10.00 1000.00 1260.17 503.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 1000.00 1260.17 503.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17.00 835.29 1096.91 678.24 =============== 202-00715 Rem CCTV Pole Each =================================================== NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 1.00 500.00 2303.33 420.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 500.00 2303.33 420.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 6.00 971.25 971.25 971.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 971.25 971.25 971.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 903.93 1415.28 892.50 =============== 202-00720 Rem CCTV Camera Each =================================================== NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 2.00 700.00 480.00 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 700.00 480.00 140.00 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 15.00 650.00 345.00 500.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 45 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00720 Rem CCTV Camera Each =================================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 341.25 341.25 341.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 16.00 630.70 344.92 490.08 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18.00 638.40 360.50 451.18 =============== 202-00725 Rem Ex Lighting Sys LUMP SUM =============================================== NHPP5502-088 US 550 RIVERSIDE SNOW SHED LI 01/25/18 1.00 14000.00 12946.14 12567.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 14000.00 12946.14 12567.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 14000.00 12946.14 12567.00 =============== 202-00750 Rem Luminaire Each =================================================== NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 6.00 100.00 57.79 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 100.00 57.79 100.00 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 10.00 100.00 232.00 66.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 1.00 400.00 273.25 150.00 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 53.00 100.00 222.75 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 64.00 104.69 225.49 136.88 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 4.00 250.00 156.58 75.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 5.00 105.80 105.53 105.53 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 55.00 404.25 404.25 404.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 64.00 371.29 323.66 360.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 134.00 231.81 235.57 241.95 =============== 202-00800 Rem Overpass Mtd Sign Brkt Each =================================================== MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 4.00 2500.00 516.50 750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 2500.00 516.50 750.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 2500.00 516.50 750.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 46 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00805 Rem Overhead Sign Str Each =================================================== NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 3.00 5000.00 7646.13 8292.25 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 3.00 5000.00 5050.00 4100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 5000.00 6348.06 6196.13 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 4.00 2000.00 7235.50 4500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 2000.00 7235.50 4500.00 SHER200-243 R2 WRONG WAY PREVENTION 10/18/18 1.00 6200.00 3000.00 2500.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 1.00 5000.00 5621.87 3600.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 1.00 6500.00 6209.60 4908.40 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 5242.09 5242.09 5242.09 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 5735.52 5324.36 4062.62 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 4353.01 6423.40 5101.95 =============== 202-00806 Rem Walkway Lin Foot =============================================== MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 331.00 6.00 99.63 7.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 331.00 6.00 99.63 7.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 331.00 6.00 99.63 7.50 =============== 202-00810 Rem Ground Sign Each =================================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 3.00 150.00 168.58 287.16 STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 88.00 85.00 45.99 35.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 9.00 150.00 53.33 55.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 6.00 150.00 103.00 79.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 19.00 100.00 87.44 100.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR MTCER100-296 MTCE R1 FY18 WEST SIGN REPLAC 01/11/18 42.00 85.00 178.75 50.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 50.00 100.00 222.00 275.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 47 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00810 Rem Ground Sign Each =================================================== NHPP5502-096 US550 STRIPING & RUMBLE STRIP 03/01/18 1.00 100.00 558.75 415.00 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 5.00 105.00 168.75 260.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 289.00 60.00 63.84 36.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 15.00 150.00 98.66 75.00 NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 3.00 60.00 103.89 100.00 MTCER500-201 R5 FY18 SIGN REPLACEMENT 03/08/18 79.00 100.00 89.00 50.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 14.00 125.00 362.12 124.23 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 21.00 120.00 86.50 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 644.00 82.63 84.17 67.99 STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 2.00 100.00 150.75 83.00 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 8.00 150.00 214.75 310.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 26.00 93.36 84.22 77.00 FSA0711-020 SH 71 & SH 94: PUNKIN CENTER 05/03/18 34.00 75.00 95.00 100.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 7.00 150.00 89.54 93.14 MTCER300-244 MTCE R3 FY 18/19 REGIONWIDE S 05/31/18 160.00 50.00 50.00 50.00 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 27.00 180.00 281.33 184.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 264.00 76.85 90.42 82.08 FBR060A-022 SH 60 over the South Platte 07/12/18 2.00 100.00 97.02 125.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 2.00 175.00 133.00 275.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 9.00 90.60 90.60 90.60 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 4.00 100.00 155.55 214.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 13.00 115.00 42.77 33.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 132.00 85.00 49.05 80.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 10.00 85.00 76.53 60.00 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 1.00 68.00 180.25 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 173.00 89.01 55.44 82.72 SHER200-243 R2 WRONG WAY PREVENTION 10/18/18 748.00 40.00 45.00 40.00 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 22.00 100.00 156.52 78.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 35.00 105.00 283.43 340.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 21.00 80.00 105.32 150.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 179.00 85.00 68.83 68.25 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 61.00 150.00 147.70 135.40 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 48 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00810 Rem Ground Sign Each =================================================== NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 4.00 100.00 153.00 194.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 8.00 200.00 108.23 70.80 ER052A-039 SH 170 11/15/18 8.00 250.00 90.42 80.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 34.00 106.60 81.19 81.19 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 3.00 90.00 121.20 65.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 16.00 100.00 86.29 90.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 144.00 80.00 28.21 25.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 12.00 75.00 220.41 231.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 100.00 95.00 112.70 113.55 MPR200-252 REGION 2 - PUEBLO COUNTY HIGH 12/20/18 248.00 40.00 64.67 39.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 212.00 42.64 42.64 42.64 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,855.00 60.49 76.96 59.29 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,936.00 68.50 79.23 64.63 =============== 202-00815 Rem of Sign (Special) Each =================================================== NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 2.00 1225.00 1503.33 560.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 1225.00 1503.33 560.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 1.00 5292.42 5292.42 5292.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 5292.42 5292.42 5292.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 2580.81 2044.63 2137.47 =============== 202-00821 Rem Sign Panel Each =================================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 24.00 70.00 53.81 32.61 STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 43.00 80.00 35.99 40.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 2.00 100.00 36.00 28.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 11.00 100.00 55.75 53.00 MTCER100-296 MTCE R1 FY18 WEST SIGN REPLAC 01/11/18 879.00 79.00 45.19 25.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 4.00 80.00 82.63 98.00 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 23.00 40.00 36.78 40.00 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 2.00 150.00 380.00 135.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 15.00 65.00 33.28 31.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 68.00 100.00 42.55 35.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 49 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00821 Rem Sign Panel Each =================================================== MTCER500-201 R5 FY18 SIGN REPLACEMENT 03/08/18 1,300.00 50.00 34.86 25.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 14.00 50.00 57.47 84.94 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 9.00 150.00 102.50 105.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,394.00 63.59 38.27 26.81 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 2.00 100.00 104.75 27.50 STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 2.00 100.00 123.25 83.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 16.00 51.64 78.88 42.00 FSA0711-020 SH 71 & SH 94: PUNKIN CENTER 05/03/18 1.00 50.00 60.00 70.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 14.00 51.00 66.27 81.09 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 1.00 50.00 76.00 76.00 MTCER300-244 MTCE R3 FY 18/19 REGIONWIDE S 05/31/18 1,420.00 10.00 17.00 25.00 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 11.00 145.00 134.58 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,467.00 12.16 20.36 26.36 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 25.00 80.00 36.55 50.00 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 50.00 40.00 272.00 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 75.00 53.33 193.52 30.00 SHER200-243 R2 WRONG WAY PREVENTION 10/18/18 401.00 45.00 22.50 30.00 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 10.00 50.00 135.11 110.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 1.00 150.00 197.57 195.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 35.00 100.00 47.65 47.25 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 150.00 35.00 115.00 30.00 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 4.00 50.00 58.66 40.64 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 2.00 100.00 110.00 40.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 48.00 60.00 22.72 20.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 80.00 10.00 30.55 30.15 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 1.00 250.00 1285.70 203.00 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 67.00 10.00 50.33 70.00 STA052A-045 SH 52B NEW RAYMER SOUTH 12/13/18 45.00 50.00 79.67 80.00 MPR200-252 REGION 2 - PUEBLO COUNTY HIGH 12/20/18 608.00 30.00 37.00 24.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 9.00 53.30 53.30 53.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,461.00 36.56 44.52 31.94 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,397.00 42.15 37.85 28.12 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 50 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00825 Rem Flashing Beacon Each =================================================== FSA0711-020 SH 71 & SH 94: PUNKIN CENTER 05/03/18 2.00 100.00 550.00 1300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 100.00 550.00 1300.00 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 2.00 186.00 417.75 750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 186.00 417.75 750.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 143.00 474.43 1025.00 =============== 202-00827 Rem of Pull Box Each =================================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 1.00 300.00 320.00 150.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 14.00 200.00 479.00 316.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15.00 206.67 473.52 304.93 STAR400-347 Various intersections across 04/12/18 7.00 175.00 170.67 250.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 1.00 202.00 231.95 180.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 1.00 200.00 164.34 164.37 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 12.00 300.00 415.00 280.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 21.00 248.90 307.06 259.73 NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 2.00 300.00 500.00 500.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 2.00 233.33 233.33 233.33 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 6.00 200.00 234.50 243.00 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 26.00 350.00 331.25 305.00 STM0252-469 R2 ADA RAMPS I-25 INT S NEV- 09/06/18 5.00 220.00 2750.00 5000.00 NHPP070A-032 I-70B & Z GRAND JCT PHASE 1 A 09/20/18 15.00 300.00 66.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 56.00 302.98 426.32 667.05 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 4.00 250.00 194.71 175.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 51 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00827 Rem of Pull Box Each =================================================== NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 21.00 400.00 225.00 300.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 82.00 231.00 231.00 231.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 107.00 264.88 224.31 242.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 199.00 269.53 340.58 368.47 =============== 202-00828 Rem Traf Sig Equipment LUMP SUM =============================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 1.00 3000.00 4250.00 2500.00 STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 1.00 60000.00 14895.00 6200.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 1.00 20000.00 10375.00 10800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 27666.67 10562.14 6500.00 NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPL 04/05/18 1.00 5000.00 4603.67 6586.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 1.00 30000.00 7309.26 5900.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 1.00 10000.00 15220.77 15363.07 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 1.00 10000.00 10666.67 10666.67 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 12500.00 9409.35 9974.85 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 1.00 15000.00 18487.50 23405.00 STM0252-469 R2 ADA RAMPS I-25 INT S NEV- 09/06/18 1.00 1500.00 9225.00 10000.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 1.00 11000.00 10365.75 12500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 9166.67 12111.00 15301.67 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 1.00 3000.00 2589.43 3000.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 4549.12 4537.60 4537.60 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 1.00 35000.00 26048.39 8318.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 14183.04 12167.83 5285.38 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13.00 15203.27 10806.12 9407.35 =============== 202-00830 Rem Traf Sig Face Each =================================================== STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 2.00 60.00 106.06 213.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 60.00 106.06 213.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 60.00 106.06 213.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 52 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00831 Rem Traf Sig Head Each =================================================== FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 16.00 110.00 110.92 61.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 1.00 200.00 109.43 80.22 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 17.00 115.29 110.85 62.13 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17.00 115.29 110.85 62.13 =============== 202-00832 Rem of Sign Panel (Spec) Each =================================================== NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 3.00 1000.00 2036.67 560.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 1000.00 2036.67 560.00 NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 5.00 400.00 1087.50 800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 400.00 1087.50 800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 625.00 1537.11 710.00 =============== 202-00840 Rem Traf Sig Pole Each =================================================== FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 4.00 1000.00 433.83 235.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 1000.00 433.83 235.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 1000.00 433.83 235.00 =============== 202-00842 Rem Mast Arm Each =================================================== FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 4.00 1000.00 435.83 235.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 1000.00 435.83 235.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 1000.00 435.83 235.00 =============== 202-00848 Rem Traf Sig Control+Cab Each =================================================== STAR400-347 Various intersections across 04/12/18 25.00 750.00 1339.67 1500.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 53 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00848 Rem Traf Sig Control+Cab Each =================================================== STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 1.00 2000.00 1251.25 1320.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 26.00 798.08 1335.19 1493.08 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 1.00 1000.00 587.65 390.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1000.00 587.65 390.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 27.00 805.56 1290.69 1452.22 =============== 202-00855 Rem Traf Sig Control Cab Each =================================================== NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 1.00 1000.00 1670.00 560.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 1000.00 1670.00 560.00 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 16.00 1250.00 1116.75 932.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 16.00 1250.00 1116.75 932.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17.00 1235.29 1141.52 910.12 =============== 202-00860 Rem Ped Push Button Each =================================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 16.00 100.00 145.00 70.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 8.00 230.00 47.69 142.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 24.00 143.33 96.34 94.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 4.00 50.00 75.05 56.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 50.00 75.05 56.25 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 40.00 250.00 108.50 44.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 40.00 250.00 108.50 44.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 54 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00860 Rem Ped Push Button Each =================================================== FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 8.00 40.00 34.19 16.50 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 19.00 100.00 43.96 46.45 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 2.00 50.00 272.78 250.00 C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 5.00 25.00 84.40 96.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 34.00 71.91 60.41 58.66 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 102.00 157.70 86.82 61.13 =============== 202-00888 Rem Video Detect Sys Each =================================================== FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 1.00 250.00 566.48 585.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 250.00 566.48 585.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 250.00 566.48 585.00 =============== 202-00889 Rem of Detect Warning Each =================================================== STM0252-469 R2 ADA RAMPS I-25 INT S NEV- 09/06/18 13.00 1218.00 500.00 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 13.00 1218.00 500.00 500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13.00 1218.00 500.00 500.00 =============== 202-00895 Rem of Impact Attenuator Each =================================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 1063.42 1063.42 1063.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1063.42 1063.42 1063.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1063.42 1063.42 1063.42 =============== 202-00900 Rem Conc Footing Each =================================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 10.00 692.90 692.90 692.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 692.90 692.90 692.90 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 692.90 692.90 692.90 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 55 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01000 Rem Fence Lin Foot =============================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 62.80 3.00 40.65 31.29 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 160.00 5.00 24.70 7.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 1,649.00 2.00 2.11 2.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 396.00 1.75 12.41 20.15 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 125.00 2.00 16.38 15.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 530.00 1.50 5.08 5.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 9,896.00 1.45 0.48 0.50 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 50.00 3.00 8.80 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12,868.80 1.59 1.32 1.89 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 1,749.00 1.00 4.11 1.06 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 2,681.00 2.00 1.70 1.10 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 1,537.00 2.00 1.79 1.65 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 252.00 15.00 4.69 3.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6,219.00 2.25 3.09 1.31 FBR060A-022 SH 60 over the South Platte 07/12/18 1,319.00 1.50 1.89 2.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 351.00 1.00 4.00 2.50 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 85,668.00 1.00 2.14 1.82 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 560.00 9.50 1.63 1.25 STA052A-040 SH 52: Antelope Creek 08/23/18 275.00 7.00 2.21 2.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 1,043.00 1.59 2.07 1.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 2,610.00 1.00 1.41 1.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 91,826.00 1.08 2.07 1.79 BR1131-006 SH 113 AT MP 11.5 10/11/18 560.00 2.00 2.94 2.50 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 432.00 5.00 2.03 2.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 165.00 3.68 3.73 3.73 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 95.00 2.00 3.20 5.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 340.00 3.00 3.21 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,592.00 3.20 2.84 2.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 112,505.80 1.24 1.98 1.79 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 56 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01030 Rem of Road Closure Gate Each =================================================== NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 2.00 1000.00 3651.67 665.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 1000.00 3651.67 665.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 4.00 1500.00 929.63 892.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 1500.00 929.63 892.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 1333.33 2290.65 816.67 =============== 202-01035 Rem of Gate Each =================================================== ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 1.00 410.00 349.20 300.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR ER144A-002 SH 144 East and West of Goodr 03/08/18 3.00 300.00 206.30 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 327.50 226.72 150.00 FBR060A-022 SH 60 over the South Platte 07/12/18 6.00 850.00 153.51 120.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 4.00 250.00 715.00 195.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 610.00 233.73 150.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 529.29 231.66 150.00 =============== 202-01130 Rem Gdrail Ty 3 Lin Foot =============================================== STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 7,688.00 6.00 4.13 4.00 STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 134.00 5.00 13.50 12.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 26,196.00 5.00 3.60 3.50 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 5,368.00 5.00 4.33 4.50 ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 550.00 5.00 9.61 5.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 122.00 4.00 19.38 19.75 STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 11,239.00 3.50 3.50 3.50 ER1151-033 PR SH 115-MP 34.7 01/25/18 103.00 9.00 30.12 40.00 ER1151-034 PR SH 115-MP 40.5 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 57 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01130 Rem Gdrail Ty 3 Lin Foot =============================================== NH0242-086 PR US24 MONTESSORI WALL MP 29 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 132.00 5.00 13.56 5.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 7,630.00 4.00 6.32 5.99 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 172.00 7.00 15.78 10.07 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 3,042.00 6.00 2.66 3.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 86.00 5.00 14.71 12.85 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 31.00 4.00 28.31 27.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 1,222.00 3.50 6.14 4.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 191.00 18.00 8.51 8.00 NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 10,867.00 8.00 4.20 4.26 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 287.50 4.00 5.78 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 75,060.50 5.26 4.63 4.14 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 747.00 4.25 10.04 17.93 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 398.00 10.00 8.62 7.70 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 12,725.00 5.00 2.74 2.65 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 1,345.00 5.00 9.67 6.50 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 1,071.00 5.00 4.14 3.56 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16,286.00 5.09 4.57 3.85 FBR060A-022 SH 60 over the South Platte 07/12/18 590.00 10.00 4.69 4.00 SHE0701-245 I-70 MEDIAN CABLE RAIL INSTAL 07/12/18 4,520.00 4.00 2.70 2.70 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 722.00 6.73 6.73 6.73 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 1,320.00 5.00 4.29 5.75 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 140.00 12.00 8.66 10.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 1,645.00 4.75 5.54 5.00 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 40.00 4.00 58.25 29.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8,977.00 5.02 4.99 4.21 NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 25.00 5.00 37.00 37.00 BR1131-006 SH 113 AT MP 11.5 10/11/18 900.00 4.00 9.48 8.00 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 1,400.00 5.00 3.63 3.50 SHER200-243 R2 WRONG WAY PREVENTION 10/18/18 25.00 30.00 17.50 25.00 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 11,676.00 4.00 2.80 2.55 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 2,063.00 4.50 4.31 4.18 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 58 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01130 Rem Gdrail Ty 3 Lin Foot =============================================== NHPP0702-366 I-70 Avon to Vail 11/08/18 36,516.00 3.75 3.66 3.60 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 966.00 4.00 4.03 3.99 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 272.00 7.00 6.87 4.72 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 2,244.00 4.53 3.31 3.31 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 100.00 5.00 19.67 10.00 C R500-198 R5 GUARDRAIL REPLACEMENT/UPGR 11/29/18 2,680.00 8.00 4.83 3.65 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 305.00 10.00 10.35 9.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 600.00 4.00 6.28 9.75 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 12.00 8.00 110.96 29.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 42,083.00 4.14 4.14 4.14 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 101,867.00 4.14 3.99 3.83 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 202,190.50 4.67 4.40 3.96 =============== 202-01135 Rem Gdrail Thrie Beam Lin Foot =============================================== NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 526.00 7.00 4.68 5.00 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 19.00 20.00 29.75 27.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 545.00 7.45 5.56 5.77 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 2,817.00 4.45 4.45 4.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,817.00 4.45 4.45 4.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,362.00 4.94 4.93 4.66 =============== 202-01140 Rem Gdrail Ty 4 Lin Foot =============================================== NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 960.00 20.00 20.64 9.00 STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 850.00 20.00 9.00 9.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 480.00 15.00 25.71 4.36 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 647.00 28.00 19.50 23.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,937.00 20.95 21.24 11.33 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 23,468.00 11.00 20.78 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 23,468.00 11.00 20.78 16.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26,405.00 12.11 20.82 15.48 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 59 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01170 Rem Gdrail Ty 7 Lin Foot =============================================== STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 80.00 35.00 63.69 22.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 80.00 35.00 63.69 22.25 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 10.00 25.00 82.50 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 25.00 82.50 40.00 NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 930.00 52.00 111.50 53.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 50.00 50.00 44.62 23.50 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 3,171.00 23.10 23.10 23.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,151.00 29.90 55.36 29.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,241.00 29.98 55.93 29.69 =============== 202-01200 Rem Tensioned Cable Barrier Lin Foot =============================================== C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 29,070.00 3.36 3.36 3.36 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 29,070.00 3.36 3.36 3.36 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 12,421.00 3.33 3.33 3.33 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 12,421.00 3.33 3.33 3.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 41,491.00 3.35 3.35 3.35 =============== 202-01300 Rem End Anchorage Each =================================================== STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 76.00 300.00 398.36 400.00 STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 4.00 350.00 420.00 400.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 61.00 200.00 185.71 183.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 60 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01300 Rem End Anchorage Each =================================================== NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 30.00 300.00 293.00 195.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 4.00 300.00 191.48 200.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 2.00 250.00 899.63 927.25 STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 48.00 200.00 190.00 190.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 8.00 280.00 428.76 417.15 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 20.00 220.00 337.95 400.00 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 1.00 265.00 447.75 420.00 ER144A-002 SH 144 East and West of Goodr 03/08/18 2.00 1500.00 376.65 390.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 2.00 230.00 205.00 215.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 258.00 259.94 312.52 285.87 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 4.00 350.00 303.94 287.20 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 4.00 400.00 434.06 137.50 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 71.00 215.00 291.94 325.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 1.00 300.00 2228.33 320.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 3.00 280.00 241.85 210.39 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 83.00 233.80 334.84 309.94 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 2.00 868.64 868.64 868.64 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 10.00 250.00 165.00 125.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 6.00 300.00 233.52 325.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 2.00 270.00 306.05 290.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20.00 328.86 247.90 275.86 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 14.00 200.00 362.50 350.00 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 28.00 300.00 328.19 300.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 6.00 300.00 257.28 156.84 NHPP0702-366 I-70 Avon to Vail 11/08/18 61.00 200.00 194.63 210.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 5.00 200.00 212.67 210.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 7.00 186.56 207.87 207.87 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 4.00 250.00 685.00 1000.00 C R500-198 R5 GUARDRAIL REPLACEMENT/UPGR 11/29/18 31.00 350.00 260.00 220.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 2.00 350.00 365.84 500.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 23.00 1301.36 1301.36 1301.36 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 181.00 386.67 310.19 393.96 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 542.00 300.80 312.71 325.28 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 61 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-04000 Plug Structure Each =================================================== NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 3.00 2000.00 5000.00 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 2000.00 5000.00 5000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 2000.00 5000.00 5000.00 =============== 202-04001 Plug Culvert Each =================================================== STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 1.00 2500.00 1287.50 1112.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 2500.00 1287.50 1112.50 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 1.00 1500.00 11433.14 7750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1500.00 11433.14 7750.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 14.00 800.00 925.24 347.88 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 2186.35 2186.73 2186.73 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 1.00 1500.00 1800.00 500.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 10.00 2500.00 4071.24 3200.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 2.00 1500.00 1605.48 2231.41 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 28.00 1531.66 1750.04 1572.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 1562.88 2127.28 1762.75 =============== 202-04002 Clean Culvert Each =================================================== ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 1.00 3000.00 2130.07 1950.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 4.00 1500.00 1718.84 1500.00 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 1.00 1500.00 7673.54 1000.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 40.00 1400.00 2017.35 3208.89 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 30.00 2000.00 1891.88 1500.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 1.00 2000.00 10366.67 8000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 77.00 1668.83 2047.83 2471.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 62 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-04002 Clean Culvert Each =================================================== STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 2.00 2500.00 2857.20 500.00 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 6.00 2500.00 1620.00 1800.00 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 7.00 2500.00 1650.00 1800.00 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 2.00 1000.00 4545.22 2100.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 67.00 1000.00 2138.69 1369.75 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 5.00 1350.00 2266.67 1250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 89.00 1272.47 2155.95 1422.73 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 3.00 1800.00 1857.25 2500.00 STMR200-246 R2–2018 CRITICAL CULVERTS REP 09/20/18 2.00 50000.00 38500.00 38500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 21080.00 3951.12 16900.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 16.00 1000.00 2610.32 2080.97 NHPP0702-366 I-70 Avon to Vail 11/08/18 8.00 3000.00 5173.71 3000.00 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 3.00 4000.00 2683.14 2366.27 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 4.00 2929.50 3038.49 3038.49 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 67.00 2000.00 2425.48 1361.90 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 10.00 2000.00 1701.47 700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 108.00 2015.91 2606.01 1618.48 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 279.00 2024.62 2289.01 2065.32 =============== 202-04004 Plug Culvert (Spec) Each =================================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 1918.79 1919.12 1919.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1918.79 1919.12 1919.12 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1918.79 1919.12 1919.12 =============== 202-04005 Clean Valve Box Each =================================================== STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 77.00 300.00 278.49 273.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 77.00 300.00 278.49 273.95 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 63 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-04005 Clean Valve Box Each =================================================== STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 49.00 200.00 249.21 236.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 49.00 200.00 249.21 236.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 126.00 261.11 267.10 259.52 =============== 202-04008 Clean Culvert Lin Foot =============================================== C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 6,763.00 26.62 26.62 26.62 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6,763.00 26.62 26.62 26.62 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 4,962.00 22.60 22.60 22.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,962.00 22.60 22.60 22.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,725.00 24.92 24.92 24.92 =============== 202-04010 Clean Inlet Each =================================================== NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 15.00 1000.00 354.35 367.06 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15.00 1000.00 354.35 367.06 NHPP0703-436 EJMT PLENUM WATERPROOFING MEM 06/28/18 50.00 91.00 384.50 330.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 50.00 91.00 384.50 330.00 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 9.00 1000.00 500.00 500.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 24.00 1000.00 246.21 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 33.00 1000.00 261.14 176.36 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 98.00 536.22 316.61 283.94 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 64 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-04041 Clean Box Girder (F & D) Sq Foot ================================================ NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 29,209.00 4.00 5.85 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 29,209.00 4.00 5.85 5.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 29,209.00 4.00 5.85 5.00 =============== 202-04050 Clean Exp Joint Lin Foot =============================================== NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 92.00 30.00 26.45 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 92.00 30.00 26.45 10.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 92.00 30.00 26.45 10.00 =============== 202-05006 Sawing Concrete (6 In) Lin Foot =============================================== STAR400-347 Various intersections across 04/12/18 99.00 35.00 39.37 40.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 99.00 35.00 39.37 40.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 99.00 35.00 39.37 40.10 =============== 202-05008 Sawing Concrete (8 In) Lin Foot =============================================== STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 38.00 150.00 22.62 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 38.00 150.00 22.62 20.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 38.00 150.00 22.62 20.00 =============== 202-05019 Sawing Concrete (Spec) Lin Foot =============================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 8,240.00 5.25 5.25 5.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8,240.00 5.25 5.25 5.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,240.00 5.25 5.25 5.25 =============== 202-05026 Sawing Asphalt Mat (6 In) Lin Foot =============================================== STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 568.00 7.30 7.00 10.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 568.00 7.30 7.00 10.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 65 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-05026 Sawing Asphalt Mat (6 In) Lin Foot =============================================== FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 60.00 3.00 11.00 10.64 STAR400-347 Various intersections across 04/12/18 74.00 20.00 40.84 43.51 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 2,894.00 4.00 2.55 2.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,028.00 4.37 3.44 3.81 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 3,469.00 3.50 2.82 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,469.00 3.50 2.82 3.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,065.00 4.18 3.36 3.95 =============== 202-05030 Sawing Asphalt Mat (10 In) Lin Foot =============================================== NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 504.00 20.00 6.04 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 504.00 20.00 6.04 5.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 52,500.00 3.31 3.31 3.31 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 52,500.00 3.31 3.31 3.31 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 132,673.00 3.15 3.15 3.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 132,673.00 3.15 3.15 3.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 185,677.00 3.24 3.23 3.20 =============== 202-05100 Sandblasting Reinf Steel Sq Yard ================================================ STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 2.00 40.00 2497.50 2400.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 66 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-05100 Sandblasting Reinf Steel Sq Yard ================================================ FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 349.00 25.00 15.61 27.75 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 414.00 25.00 22.20 11.44 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 289.00 25.00 20.41 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,054.00 25.03 21.51 26.46 NHPP0702-366 I-70 Avon to Vail 11/08/18 4.00 40.00 97.09 96.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 40.00 97.09 96.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,058.00 25.09 21.71 26.72 =============== 202-05150 Sandblasting Sq Foot ================================================ FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 5,000.00 2.50 2.78 3.96 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5,000.00 2.50 2.78 3.96 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,000.00 2.50 2.78 3.96 =============== 202-05300 Rem and Disposal of Paint LUMP SUM =============================================== FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 1.00 8000.00 3326.35 2500.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 1.00 10000.00 24375.78 489.27 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 1.00 125000.00 121318.75 60000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 47666.67 46697.41 20996.42 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 1.00 12400.00 17018.51 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 12400.00 17018.51 3000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 38850.00 39952.20 16497.32 =============== 202-06000 Rem Detour LUMP SUM =============================================== FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 1.00 40000.00 76111.11 85000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 40000.00 76111.11 85000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 40000.00 76111.11 85000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 67 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-06530 Clean Drain Pipe (Spec) Each =================================================== BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 5.00 530.00 2503.50 2139.26 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 530.00 2503.50 2139.26 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 530.00 2503.50 2139.26 =============== 203-00000 Uncl Excav Cubic Yard ============================================= FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 50.00 70.00 29.21 43.41 ER1151-033 PR SH 115-MP 34.7 01/25/18 5,500.00 18.00 13.86 1.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,550.00 18.47 13.92 1.38 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 2,750.00 25.00 30.67 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,750.00 25.00 30.67 14.00 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 22.00 50.00 108.12 44.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 22.00 50.00 108.12 44.00 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 747.00 25.00 67.00 35.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 510.00 40.00 47.69 13.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 53.00 35.00 104.96 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,310.00 31.24 59.54 25.83 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,632.00 22.14 27.58 8.41 =============== 203-00010 Uncl Excav (CIP) Cubic Yard ============================================= STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 75.00 15.00 152.50 140.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 68 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00010 Uncl Excav (CIP) Cubic Yard ============================================= STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 1,511.00 25.00 34.69 27.75 CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 4,747.00 51.44 60.00 60.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 8,570.00 18.00 25.51 16.21 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 387.00 50.00 36.10 31.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 44,227.00 17.00 25.53 10.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 617.00 40.00 33.75 36.00 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 25,823.00 31.41 39.00 39.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 1,210.00 25.00 30.00 44.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 87,167.00 23.80 26.95 23.09 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 2,624.00 15.00 45.70 35.00 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 3,794.00 40.00 15.00 15.00 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 2,859.00 10.00 13.13 11.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 130.00 20.00 46.30 55.21 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 826.00 75.00 116.00 116.00 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 24.00 140.00 305.00 140.00 ER055A-001 PR SH 55 FLOOD REPAIR 2015 06/28/18 8,833.00 11.00 15.37 5.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 19,090.00 20.16 18.88 17.56 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 1,185.00 50.00 89.39 61.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 793.00 33.50 27.92 21.50 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 5,099.00 20.00 10.50 10.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 2,402.00 30.00 22.88 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9,479.00 27.41 21.19 19.36 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 90.00 80.00 51.00 32.00 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 3,469.00 22.00 30.47 21.50 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 2,632.00 18.00 32.24 22.00 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 2,953.00 50.00 29.68 23.35 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 840.00 40.00 46.33 35.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 7,312.00 20.00 20.28 11.71 ER052A-039 SH 170 11/15/18 91.00 75.00 47.81 48.00 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 54.40 140.00 83.00 83.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 2.00 500.00 614.15 837.45 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 18,397.00 10.00 10.37 7.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 69 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00010 Uncl Excav (CIP) Cubic Yard ============================================= FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 23,020.00 25.00 20.51 15.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 58,860.40 20.95 19.91 13.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 174,596.40 22.64 23.28 19.17 =============== 203-00040 Uncl Excav (Spec) Cubic Yard ============================================= C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 30,769.00 12.39 12.39 12.39 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 30,769.00 12.39 12.39 12.39 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 12,319.00 18.69 18.69 18.69 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 12,319.00 18.69 18.69 18.69 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 43,088.00 14.19 14.19 14.19 =============== 203-00050 Unsuitable Material Cubic Yard ============================================= STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 250.00 50.00 57.15 48.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 65.00 25.00 92.11 60.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR ER144A-002 SH 144 East and West of Goodr 03/08/18 612.00 46.00 35.72 18.32 NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 207.00 20.00 35.60 15.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,134.00 40.93 40.51 26.67 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 10.00 40.00 69.78 13.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 40.00 69.78 13.20 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 2,500.00 34.86 34.86 34.86 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,500.00 34.86 34.86 34.86 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 70 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00050 Unsuitable Material Cubic Yard ============================================= BR1131-006 SH 113 AT MP 11.5 10/11/18 100.00 30.00 38.26 50.00 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 500.00 38.00 54.54 40.00 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 35.00 50.00 74.41 68.81 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 3,350.00 35.18 35.19 35.19 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 915.00 15.00 29.71 15.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 2,000.00 48.30 48.30 48.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6,900.00 36.51 38.15 37.05 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10,544.00 36.60 38.68 35.39 =============== 203-00060 Emb Matl (CIP) Cubic Yard ============================================= FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 40.00 50.00 121.68 68.35 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 2,575.00 16.75 36.33 29.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 440.00 50.00 55.55 30.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 10,679.00 15.00 21.10 30.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 6,495.00 20.00 23.35 14.00 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 778.00 60.00 47.43 25.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 1,142.00 60.00 62.86 52.86 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 5,744.00 25.00 53.60 42.00 ER144A-002 SH 144 East and West of Goodr 03/08/18 72,857.00 15.00 15.74 7.49 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 307.00 35.00 56.70 45.39 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 101,057.00 17.02 18.67 13.68 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 8,911.00 25.00 14.00 13.14 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 97.00 26.00 9.67 15.00 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 1,603.00 17.50 10.00 5.00 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 20,771.00 26.00 13.50 11.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 1,289.00 35.00 55.06 41.86 FBR0705-087 I-70: EMERGENCY BRIDGE G-25-K 05/16/18 48,000.00 19.00 19.00 19.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 80,671.00 21.70 17.09 16.38 FBR060A-022 SH 60 over the South Platte 07/12/18 28,222.00 9.50 17.18 12.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 71 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00060 Emb Matl (CIP) Cubic Yard ============================================= STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 883.00 20.00 45.88 15.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 44,456.00 11.15 11.15 11.15 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 6.00 200.00 205.58 200.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 14,784.00 10.00 12.76 12.00 STA052A-040 SH 52: Antelope Creek 08/23/18 973.00 25.00 45.42 35.50 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 51.00 40.00 80.63 90.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 10,424.00 15.00 21.03 21.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 13.00 150.00 71.25 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 99,812.00 11.17 17.00 12.87 BR1131-006 SH 113 AT MP 11.5 10/11/18 2,247.00 13.50 33.03 14.77 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 1,122.00 26.00 65.48 115.97 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 25,242.00 20.00 25.50 18.99 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 357.00 40.00 36.89 21.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 840.00 45.00 112.75 230.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 52,992.00 9.00 18.31 15.54 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 20,397.00 34.12 34.11 34.11 C R500-198 R5 GUARDRAIL REPLACEMENT/UPGR 11/29/18 5.00 75.00 280.00 85.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 2,004.00 35.00 37.49 42.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 1,543.00 30.00 55.54 40.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 35.00 150.00 82.42 50.00 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 6,752.00 14.00 30.00 28.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 397,958.00 12.00 12.00 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 511,494.00 13.26 18.89 14.61 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 793,034.00 14.33 18.18 14.46 =============== 203-00062 Emb Matl (CIP) (Spec) Cubic Yard ============================================= ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 602.00 17.00 31.01 32.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 602.00 17.00 31.01 32.00 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 3,932.00 25.00 25.95 27.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,932.00 25.00 25.95 27.42 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 108,944.00 19.60 19.60 19.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 108,944.00 19.60 19.60 19.60 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 72 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00062 Emb Matl (CIP) (Spec) Cubic Yard ============================================= ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 1,200.00 50.00 24.35 12.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,200.00 50.00 24.35 12.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 114,678.00 20.09 21.63 19.86 =============== 203-00065 Emb Matl (CIP) (R20) Cubic Yard ============================================= NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 200.00 25.00 112.50 40.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 37.00 125.00 101.88 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 237.00 40.61 109.63 49.37 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 14,719.00 12.00 16.93 11.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 14,719.00 12.00 16.93 11.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14,956.00 12.45 17.79 11.85 =============== 203-00066 Emb Matl (CIP) (R40) Cubic Yard ============================================= ER1151-033 PR SH 115-MP 34.7 01/25/18 5,500.00 20.00 18.57 1.10 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,500.00 20.00 18.57 1.10 FBR060A-022 SH 60 over the South Platte 07/12/18 8,581.00 14.00 17.59 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8,581.00 14.00 17.59 12.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 4,155.00 25.00 33.65 25.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,155.00 25.00 33.65 25.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18,236.00 18.32 21.10 11.82 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 73 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00100 Muck Excav Cubic Yard ============================================= NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 2,661.00 25.00 41.88 40.00 ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 995.00 40.00 35.49 11.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 351.00 40.00 47.22 41.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 400.00 40.00 44.00 28.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,407.00 30.94 39.94 32.44 FBR060A-022 SH 60 over the South Platte 07/12/18 2,000.00 32.00 28.49 33.00 C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 250.00 30.00 66.50 85.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 200.00 42.00 34.39 33.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 25.00 40.00 102.03 60.00 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 1,000.00 40.00 35.50 22.00 STM0252-469 R2 ADA RAMPS I-25 INT S NEV- 09/06/18 20.00 26.00 132.50 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,495.00 34.74 31.36 34.72 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 50.00 20.00 98.00 50.00 C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 250.00 70.00 38.60 35.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 1,000.00 25.00 24.41 15.72 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,300.00 33.46 30.98 20.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,202.00 32.74 34.74 31.66 =============== 203-00210 Borrow (CIP) Cubic Yard ============================================= NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 338.00 33.00 27.83 33.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 39,933.00 19.86 19.86 19.86 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 40,271.00 19.97 20.25 19.97 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 9,666.00 30.14 30.14 30.14 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9,666.00 30.14 30.14 30.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 49,937.00 21.94 22.10 21.94 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 74 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00400 Rock Excav Cubic Yard ============================================= ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 4,650.00 55.00 34.84 20.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 10.00 100.00 330.89 421.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,660.00 55.10 34.99 20.86 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 1,400.00 35.00 30.00 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,400.00 35.00 30.00 25.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,060.00 50.45 34.20 21.82 =============== 203-00440 Rock Excav (Spec) Cubic Yard ============================================= ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 200.00 95.00 74.11 60.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 200.00 95.00 74.11 60.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 200.00 95.00 74.11 60.00 =============== 203-00510 Rock Fill (Spec) Cubic Yard ============================================= ER144A-002 SH 144 East and West of Goodr 03/08/18 26,158.00 75.00 75.71 65.57 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 26,158.00 75.00 75.71 65.57 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26,158.00 75.00 75.71 65.57 =============== 203-00599 Rock Scaler Hour =================================================== STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 144.00 150.00 263.50 285.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 144.00 150.00 263.50 285.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 144.00 150.00 263.50 285.00 =============== 203-01100 Proof Rolling Hour =================================================== STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 20.00 120.00 103.25 100.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 75 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01100 Proof Rolling Hour =================================================== CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 12.00 160.57 100.00 100.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 40.00 122.00 117.88 87.57 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 20.00 138.37 100.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 92.00 130.15 113.43 94.60 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 40.00 130.00 129.38 220.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 40.00 130.00 129.38 220.00 FBR060A-022 SH 60 over the South Platte 07/12/18 40.00 110.00 122.46 80.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 200.00 152.25 152.25 152.25 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 20.00 109.00 84.35 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 260.00 142.42 120.57 135.58 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 12.00 100.00 147.15 135.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 20.00 100.00 148.27 129.47 STA052A-045 SH 52B NEW RAYMER SOUTH 12/13/18 40.00 130.00 88.67 85.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 200.00 152.25 152.25 152.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 272.00 142.83 134.31 139.92 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 664.00 140.14 123.66 136.77 =============== 203-01140 Rolling Hour =================================================== STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 20.00 100.00 100.00 100.00 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 20.00 130.00 121.13 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 40.00 115.00 116.90 100.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 20.00 120.00 136.74 130.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 40.00 90.00 101.83 100.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 76 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01140 Rolling Hour =================================================== STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 20.00 90.00 94.10 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 80.00 97.50 110.79 102.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 120.00 103.33 112.49 101.83 =============== 203-01500 Blading Hour =================================================== STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 50.00 170.00 153.27 170.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 20.00 140.00 148.03 100.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 20.00 125.00 135.50 92.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 96.00 151.00 146.99 125.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 70.00 145.00 172.50 155.00 CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 12.00 246.77 188.00 188.00 STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 40.00 150.00 125.00 125.00 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 48.00 135.00 144.89 170.00 ER1151-033 PR SH 115-MP 34.7 01/25/18 52.00 116.92 172.03 165.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 20.00 148.00 170.61 189.55 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 20.00 130.00 159.42 128.35 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 70.00 140.00 137.81 130.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 24.00 130.00 160.55 125.00 ER144A-002 SH 144 East and West of Goodr 03/08/18 250.00 145.00 157.34 150.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 60.00 140.00 176.28 125.00 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 20.00 230.70 100.00 100.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 10.00 175.00 130.00 130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 882.00 146.78 157.15 142.79 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 60.00 150.00 167.90 125.00 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 25.00 150.00 138.19 107.45 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 40.00 134.00 134.50 100.00 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 190.00 150.00 120.00 100.00 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 20.00 135.00 130.43 91.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 10.00 150.00 150.32 161.29 MTCE R100-312 R1 CHIP SEAL 05/17/18 35.00 146.83 250.00 250.00 ER055A-001 PR SH 55 FLOOD REPAIR 2015 06/28/18 140.00 130.00 149.64 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 520.00 142.59 146.22 120.90 FBR060A-022 SH 60 over the South Platte 07/12/18 16.00 125.00 148.19 125.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 77 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01500 Blading Hour =================================================== STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 30.00 130.00 161.75 87.50 STA052A-040 SH 52: Antelope Creek 08/23/18 30.00 127.00 140.83 125.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 70.00 150.00 89.69 120.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 40.00 134.00 155.37 180.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 186.00 137.47 139.21 128.90 BR1131-006 SH 113 AT MP 11.5 10/11/18 40.00 115.00 153.12 100.00 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 20.00 140.00 109.00 125.00 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 10.00 145.00 140.56 123.47 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 50.00 145.00 127.62 150.87 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 12.00 140.00 166.07 190.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 40.00 135.00 167.29 130.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 60.00 135.00 158.80 155.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 40.00 150.00 144.37 102.60 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 40.00 150.00 130.56 121.11 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 3.00 200.00 138.67 100.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 30.00 135.00 155.51 127.05 ER052A-039 SH 170 11/15/18 10.00 140.00 155.17 133.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 40.00 207.87 207.90 207.90 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 20.00 150.00 109.60 125.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 20.00 160.00 148.00 140.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 40.00 120.00 113.58 150.75 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 100.00 110.00 181.44 137.00 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 20.00 130.00 125.68 110.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 200.00 140.00 125.96 115.24 STA052A-045 SH 52B NEW RAYMER SOUTH 12/13/18 150.00 150.00 166.00 143.00 STAR100-279 FY20 HMA PREVENTATIVE MAINTEN 12/13/18 70.00 150.00 175.00 175.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,015.00 141.13 149.79 136.69 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,603.00 143.08 150.96 135.05 =============== 203-01510 Backhoe Hour =================================================== STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 10.00 150.00 129.28 85.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 36.00 135.00 141.38 125.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 20.00 150.00 124.50 110.00 CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 12.00 284.05 210.00 210.00 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 48.00 125.00 146.95 160.00 ER1151-033 PR SH 115-MP 34.7 01/25/18 24.00 100.00 133.69 155.00 ER1151-034 PR SH 115-MP 40.5 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 78 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01510 Backhoe Hour =================================================== NH0242-086 PR US24 MONTESSORI WALL MP 29 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 20.00 140.00 135.80 125.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 20.00 160.00 155.10 83.24 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 20.00 140.00 129.04 115.48 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 70.00 140.00 126.18 160.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 24.00 140.00 126.76 90.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 140.00 165.00 129.88 97.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 16.00 150.00 90.67 90.00 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 20.00 293.51 200.00 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 480.00 155.21 133.62 125.68 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 60.00 150.00 162.80 166.00 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 25.00 130.00 132.23 113.45 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 40.00 163.00 140.50 50.00 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 190.00 120.00 115.00 50.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 40.00 140.00 141.88 137.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 355.00 132.87 137.31 83.93 FBR060A-022 SH 60 over the South Platte 07/12/18 16.00 100.00 116.47 85.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 20.00 150.00 157.21 87.50 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 100.00 199.50 199.50 199.50 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 10.00 185.00 225.00 200.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 60.00 140.00 134.49 115.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 50.00 160.00 88.28 140.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 40.00 163.00 148.36 150.00 STMR200-246 R2–2018 CRITICAL CULVERTS REP 09/20/18 40.00 125.00 110.00 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 336.00 161.67 136.75 146.90 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 10.00 150.00 83.50 90.00 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 20.00 150.00 109.26 83.30 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 12.00 125.00 138.62 118.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 250.00 160.00 198.74 265.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 40.00 106.60 106.62 106.62 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 20.00 125.00 149.86 138.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 100.00 120.00 148.63 63.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 79 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01510 Backhoe Hour =================================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 100.00 200.90 200.90 200.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 552.00 153.72 175.14 187.86 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,723.00 151.39 144.96 141.14 =============== 203-01515 Backhoe (Landscaping) Hour =================================================== NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 20.00 200.00 117.50 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 200.00 117.50 75.00 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 32.00 135.00 136.67 180.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 32.00 135.00 136.67 180.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 52.00 160.00 127.95 139.62 =============== 203-01549 Pump Hour =================================================== NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 40.00 250.00 315.00 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 40.00 250.00 315.00 300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 250.00 315.00 300.00 =============== 203-01550 Dozing Hour =================================================== NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 10.00 150.00 187.50 190.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 36.00 180.00 152.29 115.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 20.00 180.00 163.75 135.00 ER1151-033 PR SH 115-MP 34.7 01/25/18 24.00 120.00 176.25 250.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 20.00 200.00 196.65 150.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 20.00 175.00 198.52 299.83 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 20.00 200.00 178.70 159.94 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 50.00 150.00 188.43 150.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 80 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01550 Dozing Hour =================================================== FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 24.00 200.00 157.05 110.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 140.00 175.00 148.88 103.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 200.00 175.00 177.51 150.00 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 20.00 225.06 110.00 110.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 10.00 130.00 140.00 130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 594.00 174.35 169.34 143.09 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 60.00 190.00 198.60 228.50 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 25.00 130.00 160.55 134.45 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 40.00 120.00 195.00 170.00 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 40.00 193.00 149.00 100.00 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 80.00 150.00 140.00 100.00 ER055A-001 PR SH 55 FLOOD REPAIR 2015 06/28/18 150.00 135.00 154.82 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 395.00 150.43 160.74 138.28 FBR060A-022 SH 60 over the South Platte 07/12/18 16.00 130.00 159.59 110.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 20.00 150.00 188.59 87.50 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 40.00 150.00 121.77 145.30 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 50.00 170.00 99.84 135.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 40.00 193.00 163.62 180.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 166.00 164.46 149.84 140.19 BR1131-006 SH 113 AT MP 11.5 10/11/18 40.00 150.00 162.41 100.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 50.00 150.00 197.70 208.10 NHPP0702-366 I-70 Avon to Vail 11/08/18 60.00 190.00 228.55 285.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 3.00 200.00 142.17 95.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 40.00 142.85 142.86 142.86 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 100.00 180.00 161.04 99.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 293.00 167.97 178.01 161.79 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,448.00 165.40 165.72 145.23 =============== 203-01555 Dozing (Landscaping) Hour =================================================== NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 10.00 220.00 160.00 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 220.00 160.00 90.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 220.00 160.00 90.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 81 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01582 Truck (Dump) Hour =================================================== STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 10.00 120.00 114.25 125.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 20.00 115.00 107.50 85.00 CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 12.00 153.51 135.00 135.00 STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 40.00 115.00 100.00 100.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 20.00 100.00 113.05 81.75 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 20.00 120.00 113.10 100.00 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 20.00 143.51 100.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 142.00 121.21 110.84 100.04 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 60.00 120.00 118.05 106.25 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 20.00 120.00 102.98 85.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 80.00 120.00 114.88 100.94 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 30.00 100.00 113.82 87.50 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 10.00 300.00 192.50 135.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 40.00 150.00 120.66 99.38 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 10.00 120.00 102.50 120.00 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 20.00 155.00 113.04 137.34 NHPP0702-366 I-70 Avon to Vail 11/08/18 360.00 115.00 128.13 125.00 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 10.00 85.00 138.44 156.88 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 40.00 117.27 117.27 117.27 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 440.00 116.46 126.91 125.47 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 702.00 119.73 122.09 116.04 =============== 203-01590 Front End Loader (Rubber) Hour =================================================== NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 20.00 150.00 125.50 97.00 CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 12.00 210.80 160.00 160.00 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 120.00 175.00 128.20 150.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 82 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01590 Front End Loader (Rubber) Hour =================================================== ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 20.00 197.07 100.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 172.00 177.16 127.64 138.72 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 30.00 150.00 183.00 248.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 30.00 150.00 183.00 248.50 FBR060A-022 SH 60 over the South Platte 07/12/18 40.00 100.00 127.90 120.00 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 20.00 175.00 118.75 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 60.00 125.00 126.59 121.67 NHPP0702-366 I-70 Avon to Vail 11/08/18 330.00 135.00 183.18 165.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 330.00 135.00 183.18 165.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 592.00 146.99 157.19 157.20 =============== 203-01594 Combination Loader Hour =================================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 20.00 100.00 102.25 104.50 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 30.00 120.00 111.75 97.00 STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 20.00 125.00 85.00 85.00 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 48.00 125.00 122.06 110.00 ER1151-033 PR SH 115-MP 34.7 01/25/18 40.00 100.00 122.49 115.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 20.00 145.00 140.22 95.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 20.00 155.00 123.67 104.43 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 90.00 130.00 122.33 120.00 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 14.00 150.00 110.00 100.00 NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 16.00 150.00 146.04 99.24 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 20.00 120.00 156.21 142.41 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 20.00 137.79 100.00 100.00 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 4.00 150.00 160.58 245.73 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 362.00 127.23 123.24 111.02 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 83 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01594 Combination Loader Hour =================================================== FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 25.00 125.00 111.57 92.45 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 40.00 120.00 98.30 75.00 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 80.00 110.00 80.00 75.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 40.00 140.00 109.00 126.50 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 60.00 110.00 132.31 97.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 20.00 150.00 230.00 230.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 265.00 120.47 110.58 101.10 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 50.00 100.00 130.72 87.50 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 40.00 125.00 131.67 145.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 40.00 140.00 113.23 139.70 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 40.00 154.00 112.07 110.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 60.00 150.00 111.60 85.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 20.00 110.00 89.69 120.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 40.00 120.00 124.07 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 290.00 130.21 119.40 116.08 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 20.00 150.00 111.21 93.64 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 150.00 130.00 128.67 102.60 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 20.00 120.00 109.72 99.44 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 200.00 160.00 127.00 74.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 20.00 125.00 127.79 111.32 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 4.00 150.00 155.00 155.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 40.00 127.93 127.94 127.94 C R500-198 R5 GUARDRAIL REPLACEMENT/UPGR 11/29/18 20.00 140.00 132.50 165.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 20.00 125.00 118.03 149.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 100.00 100.00 112.57 64.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 594.00 135.38 124.07 92.08 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,511.00 129.82 120.35 102.80 =============== 203-01597 Potholing Hour =================================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 20.00 300.00 450.61 601.21 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 84 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01597 Potholing Hour =================================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 40.00 200.00 260.00 240.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 20.00 250.00 266.67 225.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 100.00 250.00 288.13 350.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 80.00 240.00 265.00 320.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 30.00 220.00 229.60 225.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR MTCER100-296 MTCE R1 FY18 WEST SIGN REPLAC 01/11/18 40.00 234.00 248.50 200.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 50.00 235.00 288.75 290.00 CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 6.00 350.89 263.00 263.00 ITSSW01-833 ABOUT 1.5 MILES NORTH OF THE 01/18/18 20.00 250.00 206.25 190.00 STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 20.00 250.00 360.00 360.00 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 40.00 205.00 224.72 270.00 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 16.00 125.00 276.34 215.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 10.00 230.00 278.50 299.50 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 24.00 125.00 259.32 288.85 C0703-440 AVALANCHE CONTROL SYSTEM: EJM 02/01/18 10.00 300.00 264.78 225.00 STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 200.00 250.00 120.00 140.00 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 40.00 400.00 300.31 240.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 24.00 225.00 254.79 275.00 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 8.00 220.00 220.00 215.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 100.00 220.00 320.38 303.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 24.00 200.00 208.86 226.25 NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 40.00 300.00 934.00 325.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 40.00 200.00 268.22 250.00 MTCER500-201 R5 FY18 SIGN REPLACEMENT 03/08/18 20.00 250.00 131.43 200.00 NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 16.00 200.00 361.67 260.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 12.00 200.00 337.94 325.87 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 10.00 328.04 250.00 250.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 80.00 200.00 257.50 215.00 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 10.00 200.00 246.67 234.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,150.00 237.70 273.52 255.42 NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPL 04/05/18 40.00 225.00 207.67 158.00 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 16.00 250.00 263.27 323.13 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 40.00 210.00 186.67 200.00 STAR400-347 Various intersections across 04/12/18 260.00 200.00 160.00 5.00 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 20.00 230.00 242.50 250.00 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 120.00 200.00 205.00 250.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 20.00 250.00 269.16 352.00 STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 30.00 200.00 211.25 235.00 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 60.00 220.00 271.25 325.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 50.00 200.00 191.33 175.33 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 40.00 500.00 610.00 610.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 85 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01597 Potholing Hour =================================================== STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 30.00 200.00 288.75 162.50 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 40.00 250.00 323.33 290.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 766.00 224.80 220.35 181.49 NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 40.00 220.00 250.00 250.00 FBR060A-022 SH 60 over the South Platte 07/12/18 100.00 175.00 240.58 235.00 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 80.00 300.00 294.92 344.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 16.00 200.00 285.14 250.00 SHE0701-245 I-70 MEDIAN CABLE RAIL INSTAL 07/12/18 24.00 250.00 200.00 200.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 40.00 200.00 202.83 185.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 130.00 280.00 290.97 312.90 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 600.00 272.32 272.32 272.32 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 10.00 660.00 289.29 310.00 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 80.00 200.00 232.50 200.00 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 120.00 250.00 226.60 235.70 C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 20.00 220.00 234.50 193.00 STA052A-040 SH 52: Antelope Creek 08/23/18 8.00 220.00 245.83 215.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 60.00 170.00 242.97 240.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 40.00 255.00 216.05 150.00 STM0252-469 R2 ADA RAMPS I-25 INT S NEV- 09/06/18 40.00 215.00 225.00 150.00 NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 40.00 215.00 225.00 225.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 40.00 230.00 254.31 200.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 20.00 200.00 224.50 190.00 NHPP070A-032 I-70B & Z GRAND JCT PHASE 1 A 09/20/18 40.00 220.00 162.50 75.00 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 40.00 650.00 215.00 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,588.00 259.23 249.17 243.99 NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 10.00 250.00 254.50 190.00 BR1131-006 SH 113 AT MP 11.5 10/11/18 10.00 200.00 243.00 87.50 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 48.00 225.00 170.25 246.00 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 40.00 250.00 267.50 225.00 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 20.00 240.00 335.76 300.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 40.00 255.00 276.88 230.65 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 60.00 200.00 285.24 255.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 90.00 230.00 322.56 440.00 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 8.00 500.00 293.75 327.50 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 500.00 250.00 253.33 175.00 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 200.00 200.00 154.71 10.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 24.00 250.00 277.50 185.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 20.00 200.00 255.43 175.45 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 86 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01597 Potholing Hour =================================================== ER052A-039 SH 170 11/15/18 20.00 250.00 269.72 318.00 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 20.00 400.00 125.00 125.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 50.00 362.44 303.85 303.85 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 100.00 200.00 234.04 213.17 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 40.00 210.00 185.00 50.00 C R500-198 R5 GUARDRAIL REPLACEMENT/UPGR 11/29/18 50.00 400.00 292.50 200.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 4.00 250.00 355.91 250.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 80.00 220.00 268.67 200.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 20.00 250.00 211.13 175.88 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 100.00 200.00 225.77 180.00 C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 20.00 220.00 214.80 229.00 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 12.00 250.00 333.13 220.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 100.00 220.00 245.99 246.74 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 100.00 200.00 165.00 160.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1,200.00 209.87 209.87 209.87 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,986.00 226.51 233.42 197.39 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,490.00 236.30 245.66 217.20 =============== 203-01620 Sweeping Hour =================================================== STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 20.00 100.00 125.00 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 100.00 125.00 125.00 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 15.00 100.00 194.38 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 15.00 100.00 194.38 125.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 35.00 100.00 179.78 125.00 =============== 203-01622 Sweeping (With Pickup Broom) Hour =================================================== NHPP0702-373 I-70 GWC Longitudinal Joint R 01/11/18 40.00 154.00 210.00 245.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 20.00 125.00 170.29 147.13 NHPP5502-096 US550 STRIPING & RUMBLE STRIP 03/01/18 60.00 100.00 195.00 380.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 120.00 122.17 190.09 296.19 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 20.00 200.00 237.00 162.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 87 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01622 Sweeping (With Pickup Broom) Hour =================================================== STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 20.00 150.00 144.06 170.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 40.00 175.00 199.83 166.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 50.00 300.00 185.43 256.28 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 50.00 300.00 185.43 256.28 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 210.00 174.57 191.63 261.89 =============== 203-02300 Rock Scaler Hour =================================================== ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 230.00 125.00 237.06 280.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 230.00 125.00 237.06 280.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 230.00 125.00 237.06 280.00 =============== 203-02330 Laborer Hour =================================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 20.00 55.00 49.09 48.17 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 40.00 60.00 44.00 31.00 NHPP0702-373 I-70 GWC Longitudinal Joint R 01/11/18 40.00 100.00 43.75 37.50 MTCER100-296 MTCE R1 FY18 WEST SIGN REPLAC 01/11/18 20.00 43.00 47.75 5.00 CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 40.00 60.34 65.00 65.00 STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 40.00 60.00 40.00 40.00 ER1151-033 PR SH 115-MP 34.7 01/25/18 164.00 41.46 46.23 46.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 40.00 52.00 43.64 30.85 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 40.00 100.00 46.24 53.43 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 90.00 70.00 54.56 60.00 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 40.00 50.00 39.25 45.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 140.00 45.00 41.63 35.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 20.00 80.00 51.34 31.10 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 10.00 40.00 49.91 52.00 NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 40.00 45.00 41.00 45.00 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 40.00 56.41 65.00 65.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 10.00 45.00 54.50 54.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 834.00 56.55 45.45 44.49 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 88 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-02330 Laborer Hour =================================================== STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 80.00 50.00 70.40 80.00 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 40.00 40.00 35.75 29.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 40.00 50.00 40.18 35.20 STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 8.00 50.00 71.75 42.00 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 60.00 50.00 50.43 31.00 MTCE R100-312 R1 CHIP SEAL 05/17/18 25.00 52.00 50.00 50.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 40.00 60.00 76.00 76.00 NHPP0703-436 EJMT PLENUM WATERPROOFING MEM 06/28/18 10.00 100.00 72.00 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 303.00 51.82 53.48 52.98 FBR060A-022 SH 60 over the South Platte 07/12/18 16.00 50.00 49.86 75.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 20.00 40.00 49.31 37.50 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 80.00 50.00 51.33 55.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 100.00 65.00 49.07 60.20 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 100.00 48.62 48.62 48.62 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 80.00 40.00 58.32 40.00 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 30.00 75.00 72.50 70.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 60.00 45.00 42.60 36.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 16.00 15.00 41.56 50.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 40.00 40.00 44.43 36.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 542.00 49.73 48.77 49.69 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 12.00 50.00 49.56 42.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 80.00 45.00 61.95 86.00 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 40.00 60.00 48.18 36.35 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 40.00 50.00 50.93 48.40 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 16.00 25.00 35.00 35.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 100.00 41.57 47.97 47.97 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 20.00 45.00 41.00 45.00 C R500-198 R5 GUARDRAIL REPLACEMENT/UPGR 11/29/18 20.00 65.00 50.00 30.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 60.00 50.00 45.15 50.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 40.00 30.00 44.25 50.25 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 12.00 30.00 51.34 50.00 STAR100-279 FY20 HMA PREVENTATIVE MAINTEN 12/13/18 50.00 75.00 40.00 50.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 100.00 51.04 51.04 51.04 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 590.00 48.76 49.46 52.28 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,269.00 52.26 48.26 48.89 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 89 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00000 Str Excav Cubic Yard ============================================= SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 76.00 25.00 35.33 30.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 224.00 40.00 56.63 75.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 1,546.00 19.00 14.84 10.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 1,535.00 40.00 21.12 5.50 CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 931.00 62.78 100.00 100.00 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 56.00 100.00 200.93 25.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 67.00 35.00 61.15 89.82 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 1,879.00 20.00 54.58 47.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 128.00 50.00 58.55 30.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 7,440.00 18.00 25.06 25.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 880.00 30.00 32.71 32.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 212.00 20.00 49.77 34.53 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 80.00 25.00 20.00 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15,054.00 25.15 28.36 30.47 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 258.00 30.00 20.37 17.88 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 12,217.00 20.00 16.33 15.00 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 401.00 35.50 27.55 25.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 170.00 150.00 30.98 15.40 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 387.00 40.00 32.75 22.00 FBR0705-087 I-70: EMERGENCY BRIDGE G-25-K 05/16/18 467.00 23.00 23.00 23.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 16.00 50.00 230.00 230.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 13,916.00 22.91 18.48 16.06 FBR060A-022 SH 60 over the South Platte 07/12/18 781.00 25.00 17.53 5.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 920.00 30.00 38.01 15.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 5,751.00 14.70 14.70 14.70 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 198.00 45.00 83.41 20.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 4,304.00 25.00 18.58 18.00 M850-027 US24E MANITOU AVE. AT RUXTON 08/28/18 780.00 50.00 69.73 28.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 610.00 25.00 24.64 20.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 1,301.00 35.00 15.99 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 14,645.00 23.76 21.94 16.47 BR1131-006 SH 113 AT MP 11.5 10/11/18 1,315.00 18.00 18.40 15.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 90 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00000 Str Excav Cubic Yard ============================================= FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 35.00 45.00 85.92 120.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 3.00 20.00 212.65 550.00 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 51.00 75.00 48.11 36.22 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 1,731.00 35.00 37.17 45.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 449.00 14.00 27.19 23.95 ER052A-039 SH 170 11/15/18 670.00 35.00 42.84 40.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 2,509.00 17.06 17.06 17.06 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 123.00 70.00 73.00 35.00 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 256.00 20.00 68.00 51.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 388.00 27.00 33.29 10.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 1,573.00 22.00 27.39 16.50 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 753.00 15.00 29.71 30.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 560.00 26.00 40.80 22.42 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 664.00 10.00 25.93 27.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 39,770.00 15.54 15.54 15.54 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 50,850.00 17.14 23.71 17.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 94,465.00 20.29 23.95 19.34 =============== 206-00050 Str Bkfl (Spec) Cubic Yard ============================================= NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1,424.00 86.14 86.14 86.14 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,424.00 86.14 86.14 86.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,424.00 86.14 86.14 86.14 =============== 206-00060 Str Bkfl (Spec) (Flow-Fill) Cubic Yard ============================================= NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 38.00 120.00 240.51 161.02 STA086A-051 SH 86; WEST OF I-70 11/29/18 23.00 250.00 585.07 900.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 17.00 500.00 214.42 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 78.00 241.15 402.83 365.63 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 78.00 241.15 402.83 365.63 =============== 206-00065 Str Bkfl (Flow-Fill) Cubic Yard ============================================= ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 21.00 205.00 270.84 200.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 91 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00065 Str Bkfl (Flow-Fill) Cubic Yard ============================================= ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 39.00 200.00 256.96 220.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 356.00 180.00 219.28 145.53 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 14.00 200.00 296.75 205.37 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 33.00 300.00 635.10 420.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 463.00 191.98 260.33 175.65 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 28.00 220.00 258.33 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 28.00 220.00 258.33 150.00 FBR060A-022 SH 60 over the South Platte 07/12/18 10.00 240.00 315.78 325.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 4.00 220.00 751.43 700.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 446.00 150.00 193.15 170.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 460.00 152.57 197.84 177.98 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 100.00 350.00 265.00 295.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 201.00 190.00 167.62 131.72 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 111.00 207.87 207.90 207.90 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 43.00 200.00 411.87 410.47 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 2.00 300.00 4075.00 650.00 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 152.00 600.00 462.66 500.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 151.00 200.00 199.87 208.00 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 6.00 205.00 183.00 180.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 176.00 290.85 290.85 290.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 942.00 296.48 262.74 273.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,893.00 234.82 235.29 224.55 =============== 206-00100 Str Bkfl (CL 1) Cubic Yard ============================================= NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 216.00 55.00 84.75 90.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 285.00 40.00 40.82 35.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 92 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00100 Str Bkfl (CL 1) Cubic Yard ============================================= ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 1,485.00 40.00 51.90 45.00 CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 1,235.00 161.51 260.00 260.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 94.00 60.00 117.52 75.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 13,255.00 35.00 39.65 36.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 500.00 42.00 87.67 65.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 94.00 35.00 86.65 63.30 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 25.00 30.00 54.00 48.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 17,189.00 45.19 45.33 54.76 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 836.00 48.00 37.85 37.14 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 2,670.00 26.00 27.33 15.00 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 396.00 35.20 50.68 65.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 280.00 100.00 80.36 48.40 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 53.00 40.00 49.50 73.00 FBR0705-087 I-70: EMERGENCY BRIDGE G-25-K 05/16/18 675.00 45.00 45.00 45.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 16.00 50.00 175.00 175.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4,926.00 37.51 40.03 29.93 FBR060A-022 SH 60 over the South Platte 07/12/18 585.00 40.00 43.51 35.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 360.00 50.00 68.97 54.86 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 9,123.00 36.07 36.07 36.07 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 104.00 85.00 126.79 87.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 1,615.00 60.00 34.30 32.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 260.00 55.00 60.28 45.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 387.00 50.00 44.95 47.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12,434.00 41.01 41.54 36.99 BR1131-006 SH 113 AT MP 11.5 10/11/18 766.00 37.00 43.00 20.69 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 6.00 75.00 107.12 60.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 124.00 45.00 72.58 38.64 ER052A-039 SH 170 11/15/18 180.00 70.00 87.94 43.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 2,169.00 93.81 93.83 93.83 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 103.00 100.00 115.00 45.00 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 256.00 27.00 94.75 89.50 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 253.00 65.00 64.15 42.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 93 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00100 Str Bkfl (CL 1) Cubic Yard ============================================= STA086A-051 SH 86; WEST OF I-70 11/29/18 5.00 46.00 303.33 225.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 413.00 58.00 63.81 54.76 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 547.00 45.00 53.43 44.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 40,319.00 44.52 44.52 44.52 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 45,141.00 47.14 50.06 46.81 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 79,690.00 45.17 45.39 45.95 =============== 206-00200 Str Bkfl (CL 2) Cubic Yard ============================================= CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 36.00 105.38 275.00 275.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 63.00 45.00 71.00 8.72 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 165.00 40.00 43.07 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 264.00 50.11 54.57 77.08 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 35.00 60.00 90.04 48.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 35.00 60.00 90.04 48.40 FBR060A-022 SH 60 over the South Platte 07/12/18 76.00 35.00 30.04 50.00 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 36.00 96.00 112.79 36.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 940.00 50.00 24.85 32.00 M850-027 US24E MANITOU AVE. AT RUXTON 08/28/18 485.00 70.00 92.96 81.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 173.00 35.00 33.49 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,710.00 54.46 36.61 45.77 BR1131-006 SH 113 AT MP 11.5 10/11/18 39.00 35.00 39.20 20.69 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 393.00 29.86 29.85 29.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 432.00 30.32 34.51 29.02 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,441.00 49.80 39.38 46.23 =============== 206-00360 Mechanical Reinforcement of Soil Cubic Yard ============================================= CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 1,235.00 36.32 40.00 40.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 94 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00360 Mechanical Reinforcement of Soil Cubic Yard ============================================= ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 2,725.00 17.00 47.52 32.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 500.00 25.00 27.81 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,460.00 23.25 44.26 34.55 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 655.00 50.00 32.76 16.03 FBR0705-087 I-70: EMERGENCY BRIDGE G-25-K 05/16/18 540.00 24.00 24.00 24.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,195.00 38.25 32.10 19.63 FBR060A-022 SH 60 over the South Platte 07/12/18 454.00 25.00 35.52 4.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 5,648.00 24.11 24.11 24.11 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 1,615.00 30.00 22.98 19.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 260.00 55.00 38.63 44.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7,977.00 26.36 26.53 22.58 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1,697.00 38.38 38.38 38.38 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 61.00 60.00 98.40 60.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 20,218.00 8.88 8.88 8.88 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 21,976.00 11.30 12.36 11.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 35,608.00 17.07 28.92 17.02 =============== 206-00510 Filter Matl (CL A) Cubic Yard ============================================= NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 553.00 150.00 96.75 105.00 ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 165.00 95.00 96.98 82.00 ER1151-033 PR SH 115-MP 34.7 01/25/18 329.00 75.00 80.75 70.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 3.00 150.00 183.11 27.25 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 2.00 300.00 330.59 300.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 1,437.00 75.00 89.56 60.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 95 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00510 Filter Matl (CL A) Cubic Yard ============================================= STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 63.00 50.00 109.48 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,552.00 92.19 91.36 74.59 BR1131-006 SH 113 AT MP 11.5 10/11/18 46.00 60.00 101.98 70.83 ER052A-039 SH 170 11/15/18 25.00 90.00 109.72 78.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 265.00 97.01 97.02 97.02 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 1.00 400.00 255.00 75.00 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 13.00 151.00 487.50 125.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 1,200.00 100.00 81.91 68.00 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 91.00 85.00 95.71 77.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,641.00 98.00 85.63 73.87 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,193.00 94.46 89.27 74.31 =============== 206-00520 Filter Matl (CL B) Cubic Yard ============================================= ER144A-002 SH 144 East and West of Goodr 03/08/18 4,081.00 78.00 53.44 52.37 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,081.00 78.00 53.44 52.37 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 44.00 100.00 101.40 123.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 44.00 100.00 101.40 123.50 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 18.00 130.00 491.50 133.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 18.00 130.00 491.50 133.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,143.00 78.46 54.33 53.48 =============== 206-01000 Bed Course Matl Cubic Yard ============================================= NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 10.00 150.00 180.04 265.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 150.00 180.04 265.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 150.00 180.04 265.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 96 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-01500 Cofferdam LUMP SUM =============================================== FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 1.00 150000.00 88697.51 70000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 150000.00 88697.51 70000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 150000.00 88697.51 70000.00 =============== 206-01750 Shoring LUMP SUM =============================================== NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 1.00 7500.00 57879.06 17900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 7500.00 57879.06 17900.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 1.00 20000.00 28728.46 11000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 20000.00 28728.46 11000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 13750.00 39328.68 14450.00 =============== 206-01781 Shoring (A 1) LUMP SUM =============================================== NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 1.00 25000.00 23500.00 24000.00 ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 1.00 50000.00 38243.96 17500.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 1.00 28000.00 61254.75 65000.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 34333.33 43930.80 35500.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 1.00 60000.00 23100.00 17000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 60000.00 23100.00 17000.00 FBR060A-022 SH 60 over the South Platte 07/12/18 1.00 20000.00 35341.39 9500.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 1.00 25000.00 47685.00 24000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 22500.00 39889.03 16750.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 97 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-01781 Shoring (A 1) LUMP SUM =============================================== BR1131-006 SH 113 AT MP 11.5 10/11/18 1.00 12000.00 43480.78 12000.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 1.00 10000.00 21777.06 16909.75 ER052A-039 SH 170 11/15/18 1.00 17500.00 53916.00 25080.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 17850.00 22973.75 22973.75 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 18060.00 18060.00 18060.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 15082.00 36785.52 19004.70 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 25764.55 38227.13 22911.23 =============== 206-01782 Shoring (A 2) LUMP SUM =============================================== NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 1.00 25000.00 16875.00 7500.00 ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 1.00 20000.00 45791.58 17500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 22500.00 37529.70 12500.00 FBR060A-022 SH 60 over the South Platte 07/12/18 1.00 20000.00 24601.93 12500.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 1.00 25000.00 18335.00 24000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 22500.00 22293.06 18250.00 BR1131-006 SH 113 AT MP 11.5 10/11/18 1.00 12000.00 21030.19 12000.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 17850.00 26255.68 26255.68 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 18060.00 18060.00 18060.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 15970.00 21218.14 18771.89 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 19701.43 26746.70 16830.81 =============== 206-01783 Shoring (A 3) LUMP SUM =============================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 17850.00 3938.32 3938.32 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 18060.00 18060.00 18060.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 17955.00 10999.16 10999.16 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 17955.00 10999.16 10999.16 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 98 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-01784 Shoring (A 4) LUMP SUM =============================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 17850.00 16854.92 16854.92 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 28245.00 28245.00 28245.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 23047.50 22549.96 22549.96 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 23047.50 22549.96 22549.96 =============== 206-01785 Shoring (A 5) LUMP SUM =============================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 17850.00 16854.92 16854.92 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 14070.00 14070.00 14070.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 15960.00 15462.46 15462.46 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 15960.00 15462.46 15462.46 =============== 206-01786 Shoring (A 6) LUMP SUM =============================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 17850.00 3938.32 3938.32 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 29295.00 29295.00 29295.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 23572.50 16616.66 16616.66 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 23572.50 16616.66 16616.66 =============== 206-01787 Shoring (A 7) LUMP SUM =============================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 26302.50 26302.50 26302.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 26302.50 26302.50 26302.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 26302.50 26302.50 26302.50 =============== 206-01788 Shoring (A 8) LUMP SUM =============================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 26775.00 26775.00 26775.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 26775.00 26775.00 26775.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 26775.00 26775.00 26775.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 99 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-01789 Shoring (A 9) LUMP SUM =============================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 62790.00 62790.00 62790.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 62790.00 62790.00 62790.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 62790.00 62790.00 62790.00 =============== 206-01790 Shoring (A 10) LUMP SUM =============================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 37642.50 37642.50 37642.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 37642.50 37642.50 37642.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 37642.50 37642.50 37642.50 =============== 206-01791 Shoring (A 11) LUMP SUM =============================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 9660.00 9660.00 9660.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 9660.00 9660.00 9660.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 9660.00 9660.00 9660.00 =============== 206-01792 Shoring (A 12) LUMP SUM =============================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 34545.00 34545.00 34545.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 34545.00 34545.00 34545.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 34545.00 34545.00 34545.00 =============== 206-01793 Shoring (A 13) LUMP SUM =============================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 12705.00 12705.00 12705.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 12705.00 12705.00 12705.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 12705.00 12705.00 12705.00 =============== 206-01794 Shoring (A 14) LUMP SUM =============================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 40740.00 40740.00 40740.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 40740.00 40740.00 40740.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 40740.00 40740.00 40740.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 100 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-01795 Shoring (A 15) LUMP SUM =============================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 12705.00 12705.00 12705.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 12705.00 12705.00 12705.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 12705.00 12705.00 12705.00 =============== 206-01796 Shoring (A 16) LUMP SUM =============================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 36330.00 36330.00 36330.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 36330.00 36330.00 36330.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 36330.00 36330.00 36330.00 =============== 206-01797 Shoring (A 17) LUMP SUM =============================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 35595.00 35595.00 35595.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 35595.00 35595.00 35595.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 35595.00 35595.00 35595.00 =============== 206-01798 Shoring (A 18) LUMP SUM =============================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 39585.00 39585.00 39585.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 39585.00 39585.00 39585.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 39585.00 39585.00 39585.00 =============== 206-01799 Shoring (A 19) LUMP SUM =============================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 38430.00 38430.00 38430.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 38430.00 38430.00 38430.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 38430.00 38430.00 38430.00 =============== 206-01800 Shoring (A 20) LUMP SUM =============================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 63801.42 63801.42 63801.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 63801.42 63801.42 63801.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 63801.42 63801.42 63801.42 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 101 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-01801 Shoring (A 21) LUMP SUM =============================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 60158.60 60158.60 60158.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 60158.60 60158.60 60158.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 60158.60 60158.60 60158.60 =============== 206-01802 Shoring (A 22) LUMP SUM =============================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 85242.89 85242.89 85242.89 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 85242.89 85242.89 85242.89 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 85242.89 85242.89 85242.89 =============== 206-01803 Shoring (A 23 ) LUMP SUM =============================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 85242.89 85242.89 85242.89 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 85242.89 85242.89 85242.89 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 85242.89 85242.89 85242.89 =============== 206-01804 Shoring (A 24) LUMP SUM =============================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 123760.44 123760.44 123760.44 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 123760.44 123760.44 123760.44 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 123760.44 123760.44 123760.44 =============== 206-01805 Shoring (A 25) LUMP SUM =============================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 34602.92 34602.92 34602.92 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 34602.92 34602.92 34602.92 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 34602.92 34602.92 34602.92 =============== 206-01809 Shoring (A 29) LUMP SUM =============================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 30660.00 30660.00 30660.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 30660.00 30660.00 30660.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 30660.00 30660.00 30660.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 102 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-01810 Shoring (A 30) LUMP SUM =============================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 141645.00 141645.00 141645.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 141645.00 141645.00 141645.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 141645.00 141645.00 141645.00 =============== 206-01811 Shoring (A 31) LUMP SUM =============================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 47349.23 47349.23 47349.23 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 47349.23 47349.23 47349.23 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 47349.23 47349.23 47349.23 =============== 206-01812 Shoring (A 32) LUMP SUM =============================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 348074.24 348074.24 348074.24 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 348074.24 348074.24 348074.24 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 348074.24 348074.24 348074.24 =============== 207-00205 Topsoil Cubic Yard ============================================= FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 16.00 350.00 142.27 84.54 STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 5.00 100.00 282.50 200.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 145.00 50.00 48.67 30.00 ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 2,296.00 24.00 14.55 10.00 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 7.50 80.00 151.66 200.00 ER1151-033 PR SH 115-MP 34.7 01/25/18 823.00 12.00 14.26 2.50 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 540.00 13.00 52.54 39.38 ER144A-002 SH 144 East and West of Goodr 03/08/18 14,334.00 10.00 6.07 1.91 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 150.00 50.00 37.08 40.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 131.00 20.00 43.50 37.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 18,447.50 12.98 8.79 5.03 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 2,087.00 15.00 35.00 25.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 103 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 207-00205 Topsoil Cubic Yard ============================================= SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 10,200.00 13.00 9.15 7.30 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 457.00 45.00 43.76 47.30 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 1,020.00 13.00 25.00 17.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 23.00 150.00 210.00 210.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 50.00 40.00 48.25 52.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 13,837.00 14.68 19.96 12.50 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 325.00 18.00 22.43 10.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 700.00 25.00 25.96 24.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 1,736.00 40.00 37.60 54.80 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 3,603.00 11.00 6.30 9.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 670.00 20.00 11.22 1.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 463.00 18.00 20.12 10.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 885.00 20.00 20.34 9.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 9.00 75.00 55.00 11.00 STMR200-246 R2–2018 CRITICAL CULVERTS REP 09/20/18 35.00 75.00 120.00 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8,426.00 20.79 13.91 19.60 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 5,896.00 11.00 7.05 7.49 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 84.00 35.00 41.70 60.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 270.00 15.00 23.36 16.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 430.00 30.00 23.50 30.00 ER052A-039 SH 170 11/15/18 11.00 75.00 46.88 42.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1,693.00 106.04 106.06 106.06 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 280.00 30.00 96.00 67.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 499.00 25.00 50.09 8.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 26.00 60.00 69.41 20.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 10,000.00 11.00 24.13 9.50 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 100.00 65.00 56.66 75.09 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 1,613.00 10.00 33.43 20.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 57,602.00 6.72 6.72 6.72 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 78,504.00 10.28 17.54 10.08 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 119,214.50 11.95 13.48 10.25 =============== 207-00210 Stockpile Topsoil Cubic Yard ============================================= NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 25.70 11.00 71.50 36.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 104 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 207-00210 Stockpile Topsoil Cubic Yard ============================================= ER1151-033 PR SH 115-MP 34.7 01/25/18 31.50 6.00 124.44 400.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 ER144A-002 SH 144 East and West of Goodr 03/08/18 14,334.00 5.00 3.20 1.53 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 131.00 10.00 21.75 11.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 14,522.20 5.06 3.39 2.55 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 500.00 8.25 20.19 6.43 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 183.00 10.00 6.33 2.00 STAR400-347 Various intersections across 04/12/18 108.00 35.00 66.67 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 791.00 12.31 21.46 5.21 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 325.00 20.00 14.43 10.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 17,167.00 10.45 10.45 10.45 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 3,603.00 6.00 5.67 9.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 1,000.00 10.00 1.92 0.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 22,095.00 9.84 7.13 9.76 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 270.00 8.00 13.63 12.50 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 158.00 15.00 23.72 40.44 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 430.00 15.00 19.83 25.00 ER052A-039 SH 170 11/15/18 11.00 15.00 38.43 11.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1,680.00 10.74 20.20 20.20 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 57,602.00 5.46 5.46 5.46 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 60,151.00 5.71 6.78 6.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 97,559.20 6.61 5.39 6.41 =============== 207-00305 Wetland Topsoil Cubic Yard ============================================= NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 53.50 27.00 96.25 65.00 ER144A-002 SH 144 East and West of Goodr 03/08/18 161.00 15.00 20.55 12.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 214.50 17.99 29.43 25.56 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 105 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 207-00305 Wetland Topsoil Cubic Yard ============================================= FBR060A-022 SH 60 over the South Platte 07/12/18 226.00 10.00 17.53 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 226.00 10.00 17.53 22.00 BR1131-006 SH 113 AT MP 11.5 10/11/18 115.00 45.00 23.31 15.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 36.00 15.00 77.52 18.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 578.00 30.00 29.91 10.50 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 656.00 18.90 18.90 18.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,385.00 25.60 29.26 15.05 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,825.50 22.77 25.72 17.14 =============== 207-00310 Stockpile Wetland Topsoil Cubic Yard ============================================= ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 380.00 10.00 24.22 11.00 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 33.50 38.00 63.67 35.00 ER144A-002 SH 144 East and West of Goodr 03/08/18 161.00 10.00 18.35 20.85 NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 22.00 35.00 165.00 150.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 15.00 50.00 214.54 179.07 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 611.50 13.41 26.58 24.03 FBR060A-022 SH 60 over the South Platte 07/12/18 226.00 3.00 11.94 6.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 10.00 65.00 76.04 28.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 370.00 90.00 24.16 19.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 606.00 57.14 19.85 14.30 BR1131-006 SH 113 AT MP 11.5 10/11/18 115.00 20.00 20.67 15.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 656.00 17.33 17.33 17.33 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 771.00 17.73 19.45 16.98 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,988.50 28.41 22.48 18.33 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 106 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 207-00405 Topsoil (Spec) Cubic Yard ============================================= CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 860.00 51.80 32.00 32.00 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 3,315.00 43.61 53.00 53.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,175.00 45.30 48.67 48.67 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 440.00 52.50 52.50 52.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 440.00 52.50 52.50 52.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,615.00 45.98 49.04 49.04 =============== 207-00700 Topsoil (Onsite)-(Pilot Program ONLY) Cubic Yard ============================================= ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 13,981.00 17.50 15.43 15.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 13,981.00 17.50 15.43 15.00 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 4,564.00 10.00 10.38 5.19 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 4,500.00 10.00 6.97 6.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 9,064.00 10.00 9.25 5.89 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 23,045.00 14.55 13.09 11.42 =============== 207-00703 Topsoil (Wetlnd) - (Pilot Prog ONLY) Cubic Yard ============================================= ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 520.00 20.00 28.68 15.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 520.00 20.00 28.68 15.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 520.00 20.00 28.68 15.00 =============== 207-00704 Sub Soil Prep - (Pilot Prog ONLY) Sq Yard ================================================ ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 134,809.00 0.85 0.80 1.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 107 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 207-00704 Sub Soil Prep - (Pilot Prog ONLY) Sq Yard ================================================ STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 134,809.00 0.85 0.80 1.00 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 25,071.00 5.00 0.65 0.30 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 13,500.00 5.00 1.75 0.18 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 38,571.00 5.00 0.88 0.26 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 173,380.00 1.77 0.82 0.83 =============== 208-00002 Erosion Log Type 1 (12 In) Lin Foot =============================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 300.00 6.00 7.39 5.78 STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 2,500.00 5.00 5.96 8.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 300.00 6.00 4.60 4.50 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 100.00 6.00 6.57 9.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 210.00 6.00 12.75 20.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 2,310.00 7.00 4.63 4.00 CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 2,040.00 5.89 12.00 12.00 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 320.00 6.00 5.26 6.75 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 1,087.00 8.00 5.87 6.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 665.00 5.20 4.31 3.51 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 710.00 8.00 5.74 3.81 C0703-440 AVALANCHE CONTROL SYSTEM: EJM 02/01/18 100.00 15.00 22.23 16.00 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 275.00 5.00 4.51 5.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 140.00 15.00 9.21 7.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 23,545.00 4.50 4.37 4.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 10,467.00 3.60 3.46 3.80 MTCER500-201 R5 FY18 SIGN REPLACEMENT 03/08/18 20.00 5.00 16.71 3.00 NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 40.00 8.00 12.50 6.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 600.00 5.00 8.21 9.41 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 1,000.00 17.25 13.00 13.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 960.00 6.00 10.50 9.00 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 655.00 7.00 7.32 7.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 48,344.00 5.08 4.39 5.10 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 250.00 5.00 9.62 5.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 108 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00002 Erosion Log Type 1 (12 In) Lin Foot =============================================== FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 546.00 5.00 4.94 3.19 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 740.00 6.00 4.17 4.00 STAR400-347 Various intersections across 04/12/18 583.00 7.00 15.00 8.00 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 5,000.00 5.00 4.54 3.75 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 5,172.00 4.00 3.13 3.25 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 100.00 6.00 6.26 2.20 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 100.00 5.00 6.17 10.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 430.00 5.00 7.87 10.96 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 130.00 6.00 6.00 6.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 100.00 8.00 8.58 6.25 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 1,000.00 5.00 18.33 15.00 NHPP0761-230 I-76 AND COUNTY ROAD 22 AT FO 06/14/18 100.00 9.00 6.45 6.00 NHPP0703-436 EJMT PLENUM WATERPROOFING MEM 06/28/18 300.00 5.00 12.50 10.00 ER055A-001 PR SH 55 FLOOD REPAIR 2015 06/28/18 490.00 5.00 5.15 6.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 15,041.00 4.84 5.75 5.01 FBR060A-022 SH 60 over the South Platte 07/12/18 8,895.00 6.00 4.60 5.00 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 100.00 8.00 7.19 5.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 500.00 5.00 7.77 7.50 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 2,500.00 6.50 5.79 5.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 230.00 6.00 4.92 4.50 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 30,000.00 3.63 3.63 3.63 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 1,500.00 6.60 6.47 6.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 5,890.00 4.00 4.59 4.20 STA052A-040 SH 52: Antelope Creek 08/23/18 755.00 7.00 4.58 4.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 604.00 6.00 6.10 6.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 6,800.00 5.00 5.27 4.00 STMR200-246 R2–2018 CRITICAL CULVERTS REP 09/20/18 100.00 8.00 7.00 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 57,874.00 4.50 4.82 4.14 BR1131-006 SH 113 AT MP 11.5 10/11/18 1,000.00 6.00 4.74 5.00 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 50.00 7.00 13.88 6.00 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 250.00 6.00 5.64 4.16 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 1,030.00 5.50 6.37 4.86 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 1,630.00 6.00 5.60 4.40 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 1,200.00 5.00 6.71 5.50 NHPP0702-366 I-70 Avon to Vail 11/08/18 3,180.00 5.00 6.48 4.79 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 6,880.00 5.00 3.89 3.68 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 600.00 6.00 6.08 4.16 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 15,450.00 5.00 4.39 4.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 109 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00002 Erosion Log Type 1 (12 In) Lin Foot =============================================== NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 1,220.00 7.00 4.72 4.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 4,165.00 5.00 4.74 4.48 ER052A-039 SH 170 11/15/18 380.00 5.00 5.37 5.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 4,700.00 3.85 3.92 3.92 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 181.00 5.00 9.70 20.00 C R500-198 R5 GUARDRAIL REPLACEMENT/UPGR 11/29/18 400.00 6.00 5.50 5.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 1,686.00 6.00 4.95 5.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 900.00 6.00 5.74 4.15 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 100.00 5.00 9.77 10.05 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 100.00 25.00 10.91 12.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 1,820.00 6.00 5.63 6.00 STA052A-045 SH 52B NEW RAYMER SOUTH 12/13/18 675.00 6.00 5.67 5.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 44,880.00 4.82 4.82 4.82 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 92,477.00 5.01 4.91 4.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 213,736.00 4.87 4.75 4.65 =============== 208-00004 Silt Berm Lin Foot =============================================== STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 450.00 15.00 12.36 18.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 450.00 15.00 12.36 18.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 450.00 15.00 12.36 18.25 =============== 208-00008 Erosion Log Type 2 (12 In) Lin Foot =============================================== ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 2,500.00 7.00 5.74 5.00 ER1151-033 PR SH 115-MP 34.7 01/25/18 250.00 4.00 4.64 4.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 200.00 10.00 7.54 7.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,950.00 6.95 5.75 5.08 STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 270.00 8.00 11.13 15.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 3,650.00 7.00 5.14 5.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,920.00 7.07 5.42 6.15 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 420.00 5.75 7.95 8.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 420.00 5.75 7.95 8.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 110 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00008 Erosion Log Type 2 (12 In) Lin Foot =============================================== NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 500.00 10.00 9.08 7.00 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 512.00 7.00 9.00 8.00 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 600.00 5.00 6.71 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,612.00 7.19 7.59 6.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,902.00 6.99 5.94 5.92 =============== 208-00009 Erosion Log Type 2 (18 In) Lin Foot =============================================== NHPP5502-096 US550 STRIPING & RUMBLE STRIP 03/01/18 600.00 8.00 11.66 13.75 NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 130.00 8.00 22.00 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 730.00 8.00 13.10 13.08 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 730.00 8.00 13.10 13.08 =============== 208-00011 Erosion Bales (Weed Free) Each =================================================== NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 12.00 30.00 23.40 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12.00 30.00 23.40 16.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 30.00 23.40 16.00 =============== 208-00012 Erosion Log Type 1 (9 In) Lin Foot =============================================== NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 537.00 15.00 7.60 6.20 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 240.00 6.50 5.12 5.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 650.00 4.00 6.88 5.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,427.00 8.56 6.68 5.68 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 5,040.00 15.00 6.33 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5,040.00 15.00 6.33 7.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,467.00 13.58 6.41 6.71 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 111 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00013 Erosion Log Type 1 (20 In) Lin Foot =============================================== C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 38,000.00 6.54 6.54 6.54 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 38,000.00 6.54 6.54 6.54 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 28,380.00 6.70 6.70 6.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 28,380.00 6.70 6.70 6.70 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 66,380.00 6.61 6.61 6.61 =============== 208-00020 Silt Fence Lin Foot =============================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 200.00 2.00 4.09 3.68 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 260.00 2.50 2.63 3.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 300.00 5.00 2.97 1.31 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 700.00 1.50 2.16 3.00 NHPP5502-096 US550 STRIPING & RUMBLE STRIP 03/01/18 200.00 2.00 2.49 2.50 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 500.00 6.00 4.46 4.91 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,160.00 3.24 2.83 3.22 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 6,051.00 2.25 1.68 1.48 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 4,700.00 3.00 1.70 1.10 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 1,000.00 3.00 2.35 2.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 11,751.00 2.61 1.75 1.39 FBR060A-022 SH 60 over the South Platte 07/12/18 635.00 2.00 2.30 3.00 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 1,000.00 3.00 3.87 3.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 2,450.00 2.50 3.02 3.13 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 250.00 4.00 10.04 5.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 2,500.00 3.00 2.49 1.50 STMR200-246 R2–2018 CRITICAL CULVERTS REP 09/20/18 400.00 10.00 3.50 3.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7,235.00 3.16 2.97 2.62 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 112 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00020 Silt Fence Lin Foot =============================================== NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 36,965.00 2.00 1.55 1.46 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 1,230.00 2.00 2.41 1.82 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 500.00 5.00 4.83 7.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 160.00 2.00 2.63 3.54 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 500.00 5.00 5.47 5.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 2,000.00 8.00 1.77 2.00 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 200.00 4.00 2.33 3.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 40,280.00 1.07 1.07 1.07 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 81,835.00 1.73 1.56 1.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 102,981.00 1.96 1.87 1.48 =============== 208-00021 Silt Fence (Reinf) Lin Foot =============================================== ER1151-033 PR SH 115-MP 34.7 01/25/18 123.00 10.00 4.24 4.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 123.00 10.00 4.24 4.00 FBR060A-022 SH 60 over the South Platte 07/12/18 565.00 2.50 4.21 5.25 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 32,000.00 3.15 3.15 3.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 32,565.00 3.14 3.33 3.19 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 900.00 2.04 2.08 2.08 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 10,000.00 3.16 3.16 3.16 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10,900.00 3.07 3.07 3.07 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 43,588.00 3.14 3.29 3.16 =============== 208-00023 Erosion Log (Type 3)(12 In) Lin Foot =============================================== ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 15,236.00 5.50 4.91 5.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 113 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00023 Erosion Log (Type 3)(12 In) Lin Foot =============================================== STA0342-060 US 34D OVERLAY AND BRIDGE WOR NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 100.00 7.00 8.54 12.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 2,499.00 5.00 5.23 4.50 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 600.00 12.00 6.33 8.50 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 1,910.00 7.74 7.00 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20,345.00 5.85 5.09 5.26 ER055A-001 PR SH 55 FLOOD REPAIR 2015 06/28/18 1,650.00 6.00 6.32 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,650.00 6.00 6.32 8.00 FBR060A-022 SH 60 over the South Platte 07/12/18 900.00 6.00 5.60 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 900.00 6.00 5.60 6.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 2,500.00 6.00 4.58 4.20 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 5,000.00 25.00 6.04 5.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 7,500.00 18.67 5.64 5.07 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30,395.00 9.02 5.36 5.39 =============== 208-00026 Coir Roll Lin Foot =============================================== NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 680.00 15.00 13.29 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 680.00 15.00 13.29 13.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 680.00 15.00 13.29 13.00 =============== 208-00033 Sediment Trap Each =================================================== NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 1.00 1200.00 2583.75 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1200.00 2583.75 2000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 114 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00033 Sediment Trap Each =================================================== C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 3.00 1050.00 1050.00 1050.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 1050.00 1050.00 1050.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 22.00 4095.00 4095.00 4095.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 22.00 4095.00 4095.00 4095.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26.00 3632.31 3571.55 3663.08 =============== 208-00035 Aggregate Bag Lin Foot =============================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 80.00 7.00 11.96 8.92 STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 400.00 8.00 15.80 16.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 80.00 12.00 6.33 6.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 500.00 10.00 6.74 3.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 232.00 12.00 10.25 8.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 80.00 10.00 9.51 8.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR MTCER100-296 MTCE R1 FY18 WEST SIGN REPLAC 01/11/18 160.00 8.00 8.75 1.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 168.00 10.00 13.69 6.25 ITSSW01-833 ABOUT 1.5 MILES NORTH OF THE 01/18/18 368.00 10.00 14.00 11.00 STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 100.00 8.00 20.00 20.00 NHPP5502-088 US 550 RIVERSIDE SNOW SHED LI 01/25/18 30.00 10.00 33.49 10.20 ER1151-033 PR SH 115-MP 34.7 01/25/18 50.00 8.00 6.89 6.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 64.00 20.00 8.30 8.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 1,340.00 8.30 5.70 4.16 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 248.00 10.00 8.65 11.52 C0703-440 AVALANCHE CONTROL SYSTEM: EJM 02/01/18 100.00 16.00 22.42 14.00 STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 56.00 16.00 11.33 20.00 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 540.00 8.00 5.61 5.00 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 80.00 12.00 14.75 17.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 250.00 10.00 8.88 7.00 MTCER500-201 R5 FY18 SIGN REPLACEMENT 03/08/18 20.00 8.00 10.71 1.00 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 48.00 14.48 12.00 12.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 150.00 12.00 16.00 12.00 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 28.00 12.00 15.74 11.21 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,172.00 9.59 8.52 7.63 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 115 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00035 Aggregate Bag Lin Foot =============================================== NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPL 04/05/18 100.00 8.00 18.33 11.00 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 100.00 8.00 19.20 10.50 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 200.00 9.00 7.46 5.32 STAR400-347 Various intersections across 04/12/18 171.00 10.00 17.00 6.00 STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 67.00 13.00 16.69 19.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 33.00 9.00 10.17 9.50 FSA0711-020 SH 71 & SH 94: PUNKIN CENTER 05/03/18 150.00 8.00 16.33 30.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 160.00 7.00 11.11 16.44 MTCE R100-312 R1 CHIP SEAL 05/17/18 200.00 11.00 25.00 25.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 158.00 10.00 10.00 10.00 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 500.00 8.00 26.00 28.00 NHPP0761-230 I-76 AND COUNTY ROAD 22 AT FO 06/14/18 200.00 9.00 9.15 8.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,039.00 8.92 14.67 17.28 NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 200.00 12.00 15.00 15.00 FBR060A-022 SH 60 over the South Platte 07/12/18 150.00 6.00 8.09 6.50 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 440.00 10.00 9.86 8.00 SHE0701-245 I-70 MEDIAN CABLE RAIL INSTAL 07/12/18 100.00 7.00 25.00 25.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 6,600.00 4.82 4.82 4.82 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 1,500.00 13.20 12.31 15.00 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 630.00 11.00 10.50 5.00 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 364.00 8.00 10.35 12.00 STA052A-040 SH 52: Antelope Creek 08/23/18 200.00 10.00 8.83 6.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 730.00 8.00 6.82 10.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 10.00 8.52 9.50 7.00 NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 200.00 10.00 16.00 16.00 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 450.00 7.50 13.41 9.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 11,574.00 7.18 9.05 7.59 NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 360.00 10.00 12.50 10.00 BR1131-006 SH 113 AT MP 11.5 10/11/18 100.00 10.00 9.57 6.25 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 100.00 10.00 13.75 13.00 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 250.00 10.00 9.88 10.00 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 100.00 12.00 6.71 7.80 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 40.00 8.00 9.88 10.98 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 1,400.00 8.00 7.27 6.25 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 116 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00035 Aggregate Bag Lin Foot =============================================== NHPP0702-366 I-70 Avon to Vail 11/08/18 240.00 10.00 13.49 16.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 3,000.00 9.00 5.62 5.51 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 350.00 10.00 11.58 8.75 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 150.00 10.00 7.10 7.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 300.00 10.00 10.97 9.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 1,500.00 7.00 8.15 8.26 ER052A-039 SH 170 11/15/18 100.00 8.00 8.44 4.00 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 490.00 12.00 5.00 5.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1,000.00 4.89 4.98 4.98 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 280.00 10.00 11.46 10.75 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 570.00 10.00 13.00 20.00 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 190.00 12.00 8.25 6.50 C R500-198 R5 GUARDRAIL REPLACEMENT/UPGR 11/29/18 60.00 12.00 9.38 8.75 STA086A-051 SH 86; WEST OF I-70 11/29/18 750.00 8.00 7.52 5.90 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 625.00 8.00 5.96 4.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 100.00 12.00 11.01 15.08 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 80.00 25.00 16.56 17.50 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 500.00 12.00 6.62 7.00 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 200.00 12.00 7.64 7.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 224.00 7.00 10.26 21.23 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 240.00 12.00 11.33 17.00 STAR100-279 FY20 HMA PREVENTATIVE MAINTEN 12/13/18 1,000.00 12.00 8.00 4.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 47,520.00 3.75 3.75 3.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 61,819.00 5.00 6.17 4.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 80,604.00 5.71 7.38 5.58 =============== 208-00036 Aggregate Bag (Special) Lin Foot =============================================== ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 2,577.00 18.13 15.00 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,577.00 18.13 15.00 15.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 3,000.00 9.50 9.38 3.47 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,000.00 9.50 9.38 3.47 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,577.00 13.49 10.37 8.80 =============== 208-00041 Rock Check Dam Each =================================================== STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 12.00 800.00 564.38 350.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 117 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00041 Rock Check Dam Each =================================================== NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 3.00 500.00 823.75 220.00 ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 4.00 500.00 824.43 720.00 ER1151-033 PR SH 115-MP 34.7 01/25/18 1.00 370.00 2154.81 5000.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 164.00 550.00 563.71 650.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 36.00 928.24 728.00 728.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 220.00 623.12 581.52 661.58 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 6.00 750.00 815.20 450.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 2.00 800.00 935.00 937.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 762.50 835.17 571.88 FBR060A-022 SH 60 over the South Platte 07/12/18 4.00 100.00 894.32 700.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 18.00 735.00 735.00 735.00 STMR200-246 R2–2018 CRITICAL CULVERTS REP 09/20/18 4.00 800.00 600.00 600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 26.00 647.31 836.54 708.85 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 60.00 910.72 910.72 910.72 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 60.00 910.72 910.72 910.72 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 314.00 683.63 610.41 710.82 =============== 208-00045 Conc Washout Str Each =================================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 1.00 1000.00 5425.00 5000.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 2.00 1500.00 718.78 375.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 4.00 1600.00 1153.80 1850.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 2.00 1500.00 1673.19 910.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 2.00 1500.00 1930.66 1200.00 CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 2.00 12437.09 30000.00 30000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 118 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00045 Conc Washout Str Each =================================================== STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 4.00 1100.00 693.16 920.00 ER1151-033 PR SH 115-MP 34.7 01/25/18 2.00 1200.00 1253.14 2100.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 2.00 2400.00 2295.48 1760.68 STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 1.00 800.00 1290.00 825.00 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 3.00 1000.00 1661.55 900.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 5.00 1000.00 1767.50 1000.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 3.00 1500.00 886.05 600.00 NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 1.00 2000.00 1080.18 629.44 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 2.00 1500.00 1538.16 1800.00 NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 1.00 1500.00 2450.00 1800.00 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 1.00 11399.50 11000.00 11000.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 2.00 1500.00 2625.00 2450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 40.00 2176.84 1763.72 3025.65 NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPL 04/05/18 1.00 750.00 850.00 365.00 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 1.00 1500.00 1537.60 900.00 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 3.00 1300.00 1493.37 1993.07 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 2.00 1300.00 1066.67 750.00 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 2.00 1250.00 955.00 1500.00 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 4.00 1000.00 1175.00 1500.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 1.00 1600.00 1439.38 2200.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 1.00 1380.00 1733.33 2100.00 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 4.00 1500.00 2166.67 1600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 19.00 1275.26 1458.00 1497.06 FBR060A-022 SH 60 over the South Platte 07/12/18 2.00 1500.00 1566.62 1500.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 1.00 1300.00 1881.43 1125.00 SHE0701-245 I-70 MEDIAN CABLE RAIL INSTAL 07/12/18 1.00 550.00 1500.00 1500.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 2.00 3150.00 3150.00 3150.00 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 14.00 4500.00 1033.22 1000.00 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 3.00 1500.00 620.00 726.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 2.00 1500.00 1794.83 2000.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 2.00 1300.00 2388.65 1300.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 1.00 3025.00 2324.25 2000.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 2.00 1500.00 1428.75 1100.00 STMR200-246 R2–2018 CRITICAL CULVERTS REP 09/20/18 3.00 1800.00 1000.00 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 33.00 2899.24 1449.68 1269.79 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 119 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00045 Conc Washout Str Each =================================================== BR1131-006 SH 113 AT MP 11.5 10/11/18 2.00 1500.00 1372.61 1125.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 1.00 3000.00 1450.16 1040.48 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 2.00 900.00 1050.17 700.34 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 2.00 1500.00 2070.00 3000.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 1.00 2000.00 968.99 1306.97 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 4.00 1250.00 725.22 712.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 2.00 1500.00 6768.99 21947.97 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 21.00 1000.00 1868.33 2180.00 MTCE0253-267 MTCE R4 FY19 I25 CONCRETE PAN 12/13/18 1.00 1500.00 4002.75 8500.00 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 2.00 1000.00 1678.57 600.00 MPR200-252 REGION 2 - PUEBLO COUNTY HIGH 12/20/18 2.00 900.00 2400.00 500.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 2.00 9091.53 9091.53 9091.53 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 42.00 1554.36 2059.90 3176.31 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 134.00 2031.80 1720.23 2423.72 =============== 208-00046 Pre-fab Conc Washout Str Each =================================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 1.00 1700.00 562.26 374.52 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 2.00 1500.00 1233.33 1800.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 1.00 1500.00 4775.00 10000.00 MTCER100-296 MTCE R1 FY18 WEST SIGN REPLAC 01/11/18 2.00 1750.00 1052.00 500.00 ITSSW01-833 ABOUT 1.5 MILES NORTH OF THE 01/18/18 1.00 2500.00 850.50 177.00 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 1.00 1000.00 2922.58 1750.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 1.00 1000.00 2091.07 1520.20 C0703-440 AVALANCHE CONTROL SYSTEM: EJM 02/01/18 2.00 5000.00 2314.20 1850.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 1.00 1000.00 2901.18 3000.00 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 2.00 2500.00 1150.00 1300.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 1.00 2500.00 1567.77 1735.54 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 4.00 1996.02 2700.00 2700.00 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 1.00 1600.00 1231.10 1751.31 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 2114.20 1947.59 2100.43 STAR400-347 Various intersections across 04/12/18 5.00 750.00 716.67 500.00 STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 1.00 1500.00 978.75 640.00 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 2.00 2000.00 1187.52 500.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 3.00 1000.00 2286.07 2279.26 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 120 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00046 Pre-fab Conc Washout Str Each =================================================== NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 3.00 2000.00 8000.00 8000.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 1.00 1500.00 1300.00 775.00 NHPP0761-230 I-76 AND COUNTY ROAD 22 AT FO 06/14/18 1.00 1500.00 1726.38 3000.00 NHPP0703-436 EJMT PLENUM WATERPROOFING MEM 06/28/18 2.00 1500.00 1885.00 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 18.00 1347.22 1770.84 2264.04 NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 1.00 1500.00 2500.00 2500.00 FBR060A-022 SH 60 over the South Platte 07/12/18 2.00 1600.00 2090.01 2250.00 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 5.00 2500.00 2284.17 460.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 1.00 1600.00 3833.33 3800.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 2.00 2000.00 1738.33 1715.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 10.00 3166.86 3166.86 3166.86 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 1.00 2000.00 2600.00 700.00 STA052A-040 SH 52: Antelope Creek 08/23/18 1.00 1750.00 1509.17 535.00 NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 1.00 1500.00 2588.00 2588.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 2.00 1500.00 1993.79 2000.00 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 2.00 1600.00 1200.25 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 28.00 2354.24 2212.00 2036.49 NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 1.00 1500.00 1633.00 1200.00 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 1.00 1500.00 1077.50 245.00 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 1.00 1500.00 1430.00 1360.00 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 1.00 2000.00 888.01 600.00 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 2.00 1600.00 1565.14 1400.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 2.00 1621.00 3035.71 2400.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 2.00 1800.00 701.23 700.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 31.00 1600.00 1002.00 500.00 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 2.00 4000.00 1535.00 500.00 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 4.00 1500.00 658.88 500.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 1.00 1600.00 2530.00 2500.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 1.00 1600.00 1329.85 1352.78 ER052A-039 SH 170 11/15/18 1.00 1500.00 2074.00 2120.00 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 2.00 600.00 1500.00 1500.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 10.00 1238.31 1062.19 1062.19 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 2.00 2500.00 5153.45 5863.81 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 1.00 1500.00 2000.00 1000.00 C R500-198 R5 GUARDRAIL REPLACEMENT/UPGR 11/29/18 1.00 2000.00 1.00 1.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 1.00 2100.00 2730.62 990.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 4.00 1500.00 1479.98 1950.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 2.00 1500.00 1850.56 1000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 121 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00046 Pre-fab Conc Washout Str Each =================================================== NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 3.00 1500.00 2129.29 1000.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 8.00 5218.54 5218.54 5218.54 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 84.00 1955.64 1624.45 1413.89 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 150.00 1978.17 1819.13 1723.66 =============== 208-00051 Storm Drain Inlet Protection (Type I) Lin Foot =============================================== STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 30.00 20.00 10.62 17.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 56.00 20.00 27.15 14.25 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 120.00 12.00 13.46 17.91 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 12.00 20.00 40.50 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 218.00 15.60 19.01 16.74 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 311.00 13.00 9.40 9.59 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 30.00 15.00 21.25 18.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 341.00 13.18 10.20 10.40 NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 6.00 200.00 250.00 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 200.00 250.00 250.00 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 100.00 15.00 79.88 13.00 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 20.00 20.00 15.80 20.00 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 520.00 10.00 12.18 11.33 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 4.00 20.00 158.40 250.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 75.00 20.00 12.31 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 719.00 12.07 22.81 12.99 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,284.00 13.84 19.10 14.05 =============== 208-00052 Storm Drain Inlet Protection (Type II) Lin Foot =============================================== FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 60.00 55.00 47.75 29.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 60.00 55.00 47.75 29.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 122 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00052 Storm Drain Inlet Protection (Type II) Lin Foot =============================================== NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 100.00 50.00 93.00 29.00 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 16.00 80.00 25.00 25.00 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 200.00 50.00 45.24 53.24 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 2.00 45.00 250.00 400.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 45.00 55.00 36.06 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 363.00 51.91 58.88 43.11 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 423.00 52.35 57.25 41.11 =============== 208-00053 Storm Drain Inlet Protect (Ty I)(84 In) Each =================================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 11.00 200.00 197.25 200.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 2.00 250.00 131.67 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 13.00 207.69 183.20 183.08 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 11.00 300.00 75.00 75.00 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 1.00 300.00 566.67 850.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12.00 300.00 180.36 139.58 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 3.00 1000.00 294.00 392.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 12.00 20.00 171.46 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 15.00 216.00 185.07 318.40 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 60.00 320.00 167.00 155.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 93.00 100.00 121.82 201.29 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 11.00 150.00 149.67 107.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 164.00 183.84 137.29 178.03 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 204.00 194.56 143.86 186.41 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 123 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00054 Storm Drain Inlet Protection (Type II) Each =================================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 5.00 300.00 300.00 340.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 2.00 250.00 186.67 135.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 5.00 50.00 317.33 300.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12.00 187.50 293.98 289.17 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 37.00 240.00 308.38 383.53 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 37.00 240.00 308.38 383.53 NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 2.00 250.00 200.00 200.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 6.00 40.00 289.72 240.00 NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 4.00 275.00 162.00 162.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.00 153.33 266.71 207.33 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 110.00 450.00 238.67 155.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 370.00 4.90 5.00 5.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 8.00 275.00 355.48 736.92 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 11.00 275.00 258.33 202.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 499.00 113.30 131.39 54.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 560.00 124.12 168.91 84.22 =============== 208-00056 Storm Drain Inlet Protection (Type III) Each =================================================== NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 2.00 400.00 745.00 490.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 400.00 745.00 490.00 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 2.00 300.00 933.33 940.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 300.00 933.33 940.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 124 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00056 Storm Drain Inlet Protection (Type III) Each =================================================== NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 9.00 300.00 350.00 350.00 FBR060A-022 SH 60 over the South Platte 07/12/18 4.00 500.00 337.94 225.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 6.00 350.00 368.53 350.00 NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 8.00 300.00 115.00 115.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 27.00 340.74 327.37 261.85 NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 9.00 300.00 410.50 370.00 SHE2254-092 SH225 AND 17TH PLACE IMPROVEM 10/18/18 4.00 490.00 496.67 450.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 1.00 300.00 168.67 143.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 640.00 4.90 5.00 5.00 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 11.00 185.00 660.00 1000.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 21.00 450.00 128.06 136.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 70.00 175.00 195.63 265.51 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 756.00 42.10 109.03 54.12 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 787.00 53.91 131.58 64.61 =============== 208-00060 Temporary Slope Drain Lin Foot =============================================== FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 70.00 20.00 39.12 22.22 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 70.00 20.00 39.12 22.22 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 140.00 20.00 32.44 18.04 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 140.00 20.00 32.44 18.04 FBR060A-022 SH 60 over the South Platte 07/12/18 400.00 12.00 25.61 3.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 460.00 42.00 42.00 42.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 860.00 28.05 27.04 23.86 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 125 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00060 Temporary Slope Drain Lin Foot =============================================== BR1131-006 SH 113 AT MP 11.5 10/11/18 40.00 15.00 71.61 50.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 180.00 15.00 52.11 28.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1,280.00 11.25 11.25 11.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,500.00 11.80 32.06 14.29 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,570.00 17.91 29.67 17.91 =============== 208-00070 Vehicle Tracking Pad Each =================================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 1.00 2000.00 1521.16 2042.31 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 2.00 2000.00 1966.67 2000.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 2.00 2000.00 2427.50 2000.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 4.00 2000.00 2566.97 2250.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 3.00 2100.00 3266.11 3100.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 2.00 2000.00 1758.75 800.00 CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 4.00 3687.08 4800.00 4800.00 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 6.00 1600.00 1419.43 500.00 ER1151-033 PR SH 115-MP 34.7 01/25/18 1.00 1000.00 1837.71 2200.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 3.00 1500.00 2930.46 1850.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 2.00 1450.00 2833.69 5288.13 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 2.00 1500.00 2604.63 2658.19 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 2.00 1500.00 3221.05 3000.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 5.00 1200.00 2881.25 1400.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 3.00 2000.00 3093.30 2000.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 2.00 2000.00 2887.78 2300.00 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 10.00 4013.63 4200.00 4200.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 2.00 2500.00 2300.00 2100.00 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 1.00 3000.00 2525.64 2083.91 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 57.00 2301.48 2703.07 2590.68 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 4.00 3000.00 3733.33 2200.00 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 5.00 2000.00 1600.00 1500.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 1.00 2300.00 2412.50 1925.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 126 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00070 Vehicle Tracking Pad Each =================================================== NH0242-071 US 24 & 31ST STREET and US24 05/03/18 2.00 2250.00 2441.67 3200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12.00 2400.00 2604.76 2052.08 FBR060A-022 SH 60 over the South Platte 07/12/18 8.00 1500.00 2760.81 1100.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 2.00 1200.00 3904.29 1875.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 8.00 1600.00 2371.67 2130.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 10.00 3255.00 3255.00 3255.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 2.00 2700.00 2452.92 2000.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 2.00 2000.00 2365.63 900.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 2.00 2600.00 2909.46 2000.00 STMR200-246 R2–2018 CRITICAL CULVERTS REP 09/20/18 3.00 2500.00 1375.00 1375.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 37.00 2212.16 2717.98 2055.81 BR1131-006 SH 113 AT MP 11.5 10/11/18 2.00 2000.00 2922.06 2000.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 4.00 2600.00 2209.18 1777.54 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 2.00 2000.00 2440.71 2500.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 1.00 2200.00 4018.71 5145.00 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 1.00 2000.00 1502.24 2004.48 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 2.00 3700.00 2815.00 2900.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 3.00 2800.00 3198.33 1750.00 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 2.00 2500.00 1900.00 2500.00 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 4.00 2650.00 2350.00 2700.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 1.00 2500.00 2881.54 2168.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 4.00 3000.00 3440.41 3100.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 2.00 2000.00 3681.60 4737.38 STA052A-045 SH 52B NEW RAYMER SOUTH 12/13/18 1.00 2500.00 1533.33 1500.00 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 4.00 3100.00 2228.57 1600.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 2.00 3255.00 3255.00 3255.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 35.00 2683.14 2719.99 2530.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 141.00 2381.17 2705.49 2389.51 =============== 208-00071 Maint Aggregate (Veh Track Pad) Cubic Yard ============================================= CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 100.00 74.42 80.00 80.00 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 463.00 87.33 80.00 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 563.00 85.04 80.00 80.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 127 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00071 Maint Aggregate (Veh Track Pad) Cubic Yard ============================================= NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 150.00 80.00 51.12 47.05 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 16.00 80.00 122.81 150.00 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 25.00 190.00 99.33 133.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 750.00 73.50 73.50 73.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 941.00 77.74 70.41 72.17 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,504.00 80.47 73.22 75.10 =============== 208-00075 Pre-fab Vehicle Track Pad Each =================================================== STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 2.00 1000.00 2262.50 700.00 ER1151-033 PR SH 115-MP 34.7 01/25/18 1.00 1500.00 1144.30 1225.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 2.00 2000.00 2035.43 1000.00 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 2.00 2500.00 1137.50 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7.00 1785.71 1716.45 946.43 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 4.00 2100.00 4015.28 5416.18 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 4.00 2000.00 3420.00 1500.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 3.00 1500.00 1420.00 10.00 ER055A-001 PR SH 55 FLOOD REPAIR 2015 06/28/18 2.00 1500.00 3220.56 4000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 13.00 1838.46 3435.64 2745.75 FBR060A-022 SH 60 over the South Platte 07/12/18 2.00 1500.00 3247.22 4000.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 10.00 17956.89 17956.89 17956.89 STA052A-040 SH 52: Antelope Creek 08/23/18 2.00 2000.00 2220.83 425.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 4.00 2400.00 3478.87 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 18.00 10898.27 4858.03 11578.83 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 1.00 1653.00 3835.71 760.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 128 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00075 Pre-fab Vehicle Track Pad Each =================================================== NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 20.00 1750.00 1682.00 1440.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 4.00 1700.00 3961.53 557.21 ER052A-039 SH 170 11/15/18 2.00 2000.00 2168.00 1590.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 8.00 4620.00 8561.66 8561.66 STA086A-051 SH 86; WEST OF I-70 11/29/18 2.00 2500.00 3693.29 2200.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 18.00 4209.38 4209.38 4209.38 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 55.00 3003.31 3161.91 3338.74 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 93.00 4276.89 3546.99 4670.64 =============== 208-00090 Erosion Control (Curb Ramp) Each =================================================== C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 59.00 350.00 468.75 600.00 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 170.00 300.00 448.75 525.00 STM0252-469 R2 ADA RAMPS I-25 INT S NEV- 09/06/18 153.00 700.00 237.50 75.00 NHPP070A-032 I-70B & Z GRAND JCT PHASE 1 A 09/20/18 131.00 500.00 244.00 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 513.00 476.12 372.22 341.96 C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 49.00 500.00 716.00 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 49.00 500.00 716.00 300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 562.00 478.20 420.94 338.30 =============== 208-00103 Removal and Disposal of Sediment (Labor) Hour =================================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 20.00 50.00 83.90 117.80 STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 40.00 50.00 69.00 60.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 20.00 55.00 47.00 75.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 40.00 50.00 52.91 34.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 15.00 60.00 52.50 35.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 72.00 63.00 44.80 75.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 250.00 40.00 60.63 37.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 40.00 60.00 74.25 30.00 CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 16.00 60.34 45.00 45.00 ITSSW01-833 ABOUT 1.5 MILES NORTH OF THE 01/18/18 10.00 80.00 52.00 29.00 STR133A-045 SH 133 MCCLURE PASS TO REDSTO 01/18/18 30.00 60.00 40.00 40.00 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 40.00 60.00 43.88 55.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 129 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00103 Removal and Disposal of Sediment (Labor) Hour =================================================== ER1151-033 PR SH 115-MP 34.7 01/25/18 60.00 52.00 46.23 46.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 85.00 60.00 91.82 65.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 117.00 54.00 77.87 47.77 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 40.00 60.00 59.12 111.61 C0703-440 AVALANCHE CONTROL SYSTEM: EJM 02/01/18 20.00 50.00 127.79 110.00 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 20.00 50.00 51.39 55.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 72.00 60.00 68.85 65.00 NHPP5502-096 US550 STRIPING & RUMBLE STRIP 03/01/18 10.00 50.00 61.00 58.00 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 16.00 100.00 62.75 45.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 200.00 50.00 47.00 36.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 50.00 75.00 47.77 51.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 25.00 50.00 56.04 84.00 NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 20.00 55.00 128.33 45.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 10.00 30.00 65.36 50.72 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 100.00 56.41 50.00 50.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 10.00 75.00 50.00 45.00 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 6.00 100.00 128.19 95.58 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,454.00 54.09 60.22 51.79 NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPL 04/05/18 5.00 50.00 113.67 36.00 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 20.00 60.00 93.20 65.00 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 40.00 50.00 50.54 48.34 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 40.00 85.00 39.00 35.00 STAR400-347 Various intersections across 04/12/18 46.00 50.00 45.33 10.00 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 40.00 54.00 56.75 29.00 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 60.00 50.00 28.00 29.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 40.00 60.00 52.12 35.20 STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 1.00 60.00 80.75 62.00 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 10.00 100.00 55.16 52.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 250.00 57.00 42.63 33.00 FSA0711-020 SH 71 & SH 94: PUNKIN CENTER 05/03/18 5.00 50.00 96.67 100.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 20.00 70.00 65.00 65.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 8.00 60.00 86.25 75.00 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 80.00 50.00 135.00 140.00 NHPP0761-230 I-76 AND COUNTY ROAD 22 AT FO 06/14/18 10.00 60.00 70.67 33.00 ER055A-001 PR SH 55 FLOOD REPAIR 2015 06/28/18 30.00 60.00 56.77 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 705.00 57.52 54.92 48.01 NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 30.00 65.00 55.00 55.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 130 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00103 Removal and Disposal of Sediment (Labor) Hour =================================================== FBR060A-022 SH 60 over the South Platte 07/12/18 80.00 40.00 58.38 60.00 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 10.00 65.00 80.50 61.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 44.00 40.00 56.74 37.50 SHE0701-245 I-70 MEDIAN CABLE RAIL INSTAL 07/12/18 20.00 46.00 60.00 60.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 45.00 60.00 50.30 55.90 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 300.00 48.62 48.62 48.62 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 100.00 66.00 59.74 40.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 200.00 52.00 44.05 36.00 STA052A-040 SH 52: Antelope Creek 08/23/18 30.00 50.00 57.83 30.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 150.00 55.00 41.56 50.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 100.00 52.00 43.32 35.00 NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 30.00 45.00 45.00 45.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 60.00 54.00 47.07 40.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 8.00 50.00 63.75 59.00 STMR200-246 R2–2018 CRITICAL CULVERTS REP 09/20/18 20.00 45.00 50.00 50.00 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 15.00 52.00 77.25 59.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,242.00 51.84 49.32 45.26 NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 30.00 60.00 46.00 45.00 BR1131-006 SH 113 AT MP 11.5 10/11/18 25.00 50.00 50.24 37.50 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 32.00 65.00 64.50 37.00 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 40.00 50.00 38.25 40.00 SHE2254-092 SH225 AND 17TH PLACE IMPROVEM 10/18/18 5.00 51.79 101.67 80.00 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 30.00 55.00 43.89 39.53 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 50.00 55.00 50.84 57.51 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 10.00 50.00 88.92 78.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 60.00 55.00 61.16 40.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 60.00 60.00 65.24 70.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 200.00 50.00 58.08 45.00 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 10.00 60.00 57.00 54.00 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 25.00 50.00 61.67 5.00 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 60.00 60.00 52.73 10.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 20.00 75.00 66.33 65.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 60.00 50.00 57.93 48.40 ER052A-039 SH 170 11/15/18 20.00 50.00 40.19 38.00 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 10.00 50.00 35.00 35.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 150.00 55.83 48.48 48.48 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 20.00 65.00 118.87 126.47 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 30.00 55.00 52.00 80.00 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 8.00 75.00 80.00 60.00 C R500-198 R5 GUARDRAIL REPLACEMENT/UPGR 11/29/18 10.00 60.00 86.50 80.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 20.00 50.00 47.99 50.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 80.00 60.00 94.13 175.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 48.00 60.00 87.38 30.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 131 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00103 Removal and Disposal of Sediment (Labor) Hour =================================================== STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 20.00 45.00 70.13 75.38 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 420.00 75.00 68.32 71.00 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 12.00 45.00 65.27 50.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 360.00 60.00 81.07 52.28 STA052A-045 SH 52B NEW RAYMER SOUTH 12/13/18 50.00 50.00 58.83 45.00 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 85.00 90.00 44.00 37.00 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 100.00 40.00 53.29 33.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 500.00 49.99 49.99 49.99 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,660.00 58.47 64.83 55.21 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,061.00 55.95 58.52 51.51 =============== 208-00105 Removal and Disposal of Sediment (Equip) Hour =================================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 20.00 150.00 113.65 127.29 STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 10.00 150.00 150.00 140.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 20.00 120.00 121.67 75.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 20.00 120.00 123.43 75.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 15.00 125.00 157.50 165.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 33.00 120.00 98.93 125.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 250.00 120.00 123.67 110.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 20.00 110.00 140.39 110.00 CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 16.00 147.78 110.00 110.00 ITSSW01-833 ABOUT 1.5 MILES NORTH OF THE 01/18/18 10.00 140.00 104.00 56.00 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 40.00 130.00 114.28 110.00 ER1151-033 PR SH 115-MP 34.7 01/25/18 60.00 100.00 126.36 115.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 34.00 125.00 138.87 100.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 39.00 98.00 121.10 112.21 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 20.00 125.00 116.02 105.01 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 20.00 130.00 112.38 130.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 34.00 125.00 126.97 100.00 NHPP5502-096 US550 STRIPING & RUMBLE STRIP 03/01/18 10.00 100.00 149.25 145.00 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 10.00 150.00 112.75 90.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 200.00 100.00 119.63 65.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 100.00 125.00 112.85 102.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 25.00 100.00 146.50 147.00 NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 20.00 125.00 135.00 90.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 10.00 120.00 162.25 124.50 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 100.00 138.15 110.00 110.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 10.00 125.00 120.00 80.00 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 4.00 165.00 257.07 147.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,150.00 118.82 121.87 102.09 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 132 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00105 Removal and Disposal of Sediment (Equip) Hour =================================================== NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPL 04/05/18 5.00 89.00 236.67 70.00 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 10.00 120.00 130.20 125.00 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 40.00 100.00 94.91 144.31 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 40.00 125.00 101.67 100.00 STAR400-347 Various intersections across 04/12/18 46.00 90.00 66.00 10.00 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 40.00 110.00 98.00 100.00 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 16.00 100.00 92.50 75.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 40.00 140.00 105.94 82.50 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 300.00 110.00 102.58 120.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 20.00 130.00 157.00 157.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 8.00 120.00 172.17 62.50 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 40.00 150.00 241.67 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 605.00 113.96 107.04 112.35 FBR060A-022 SH 60 over the South Platte 07/12/18 80.00 90.00 114.32 150.00 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 10.00 160.00 166.83 155.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 20.00 100.00 125.29 87.50 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 20.00 150.00 107.05 134.15 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 300.00 96.16 96.16 96.16 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 50.00 120.00 95.82 110.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 200.00 115.00 103.34 115.00 STA052A-040 SH 52: Antelope Creek 08/23/18 8.00 125.00 120.00 65.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 100.00 110.00 89.69 120.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 100.00 120.00 115.61 110.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 60.00 110.00 117.05 150.00 STMR200-246 R2–2018 CRITICAL CULVERTS REP 09/20/18 20.00 85.00 100.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 968.00 107.38 108.19 113.48 NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 50.00 115.00 91.50 75.00 BR1131-006 SH 113 AT MP 11.5 10/11/18 50.00 100.00 110.04 87.50 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 32.00 120.00 98.00 72.00 SHE2254-092 SH225 AND 17TH PLACE IMPROVEM 10/18/18 5.00 102.09 181.67 130.00 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 30.00 110.00 110.08 83.30 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 50.00 110.00 151.14 78.42 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 10.00 105.00 162.39 265.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 32.00 111.00 168.14 75.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 133 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00105 Removal and Disposal of Sediment (Equip) Hour =================================================== NHPP0702-366 I-70 Avon to Vail 11/08/18 30.00 115.00 141.83 145.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 20.00 100.00 93.93 90.00 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 10.00 130.00 135.90 136.80 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 10.00 140.00 136.67 5.00 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 60.00 125.00 80.01 10.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 10.00 140.00 184.00 80.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 32.00 100.00 131.19 66.55 ER052A-039 SH 170 11/15/18 4.00 100.00 98.34 57.00 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 10.00 125.00 55.00 55.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 40.00 91.25 130.97 130.97 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 20.00 100.00 216.05 224.20 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 30.00 135.00 89.00 125.00 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 8.00 150.00 177.50 210.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 20.00 100.00 128.91 145.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 10.00 100.00 137.12 211.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 20.00 100.00 118.92 100.50 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 420.00 135.00 112.96 90.00 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 12.00 100.00 145.31 100.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 90.00 113.00 101.68 119.71 STA052A-045 SH 52B NEW RAYMER SOUTH 12/13/18 50.00 100.00 113.33 85.00 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 85.00 150.00 62.33 77.00 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 100.00 110.00 94.29 70.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 500.00 97.53 97.53 97.53 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,850.00 114.53 111.90 93.48 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,573.00 114.02 113.59 102.37 =============== 208-00106 Sweeping (Sediment Removal) Hour =================================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 20.00 150.00 128.73 157.46 STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 8.00 150.00 252.50 180.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 40.00 150.00 141.67 155.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 40.00 150.00 166.88 120.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 20.00 150.00 151.25 150.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 33.00 150.00 134.70 135.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 160.00 160.00 146.73 170.00 MTCER100-296 MTCE R1 FY18 WEST SIGN REPLAC 01/11/18 20.00 145.00 72.50 10.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 20.00 150.00 152.25 125.00 CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 30.00 217.55 175.00 175.00 ITSSW01-833 ABOUT 1.5 MILES NORTH OF THE 01/18/18 10.00 185.00 137.00 56.00 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 40.00 130.00 124.02 140.00 NHPP5502-088 US 550 RIVERSIDE SNOW SHED LI 01/25/18 20.00 150.00 171.75 120.75 ER1151-033 PR SH 115-MP 34.7 01/25/18 34.00 120.00 166.71 250.00 ER1151-034 PR SH 115-MP 40.5 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 134 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00106 Sweeping (Sediment Removal) Hour =================================================== NH0242-086 PR US24 MONTESSORI WALL MP 29 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 120.00 115.00 169.84 150.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 120.00 100.00 169.70 163.51 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 24.00 150.00 157.27 150.00 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 40.00 150.00 148.75 200.00 ER144A-002 SH 144 East and West of Goodr 03/08/18 80.00 140.00 118.80 125.00 NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 20.00 200.00 144.27 80.32 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 40.00 130.00 150.03 126.00 NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 8.00 150.00 3183.33 310.00 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 150.00 223.07 175.00 175.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 10.00 160.00 175.00 170.00 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 30.00 170.00 205.60 118.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,137.00 152.57 161.99 154.03 NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPL 04/05/18 20.00 150.00 125.67 77.00 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 40.00 140.00 113.74 100.20 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 100.00 160.00 190.00 160.00 STAR400-347 Various intersections across 04/12/18 23.00 140.00 65.67 29.00 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 20.00 140.00 125.50 100.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 40.00 170.00 133.53 49.50 STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 1.00 200.00 227.50 175.00 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 10.00 130.00 159.00 125.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 150.00 150.00 130.92 170.00 FSA0711-020 SH 71 & SH 94: PUNKIN CENTER 05/03/18 20.00 140.00 147.33 92.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 75.00 150.00 156.04 219.16 MTCE R100-312 R1 CHIP SEAL 05/17/18 35.00 120.00 135.00 135.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 24.00 135.00 124.17 112.50 ER055A-001 PR SH 55 FLOOD REPAIR 2015 06/28/18 30.00 150.00 139.33 205.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 588.00 148.66 137.20 144.51 NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 50.00 155.00 180.00 180.00 FBR060A-022 SH 60 over the South Platte 07/12/18 80.00 120.00 159.22 135.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 10.00 120.00 140.89 87.50 SHE0701-245 I-70 MEDIAN CABLE RAIL INSTAL 07/12/18 40.00 185.00 100.00 100.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 50.00 140.00 163.33 160.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 10.00 150.00 128.27 194.80 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 2,250.00 166.70 166.70 166.70 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 30.00 176.00 185.39 125.00 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 10.00 165.00 255.00 200.00 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 30.00 150.00 128.25 158.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 135 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00106 Sweeping (Sediment Removal) Hour =================================================== BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 40.00 160.00 134.91 135.00 STA052A-040 SH 52: Antelope Creek 08/23/18 40.00 140.00 124.17 65.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 81.00 145.00 127.81 170.00 NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 50.00 45.00 45.00 45.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 30.00 140.00 147.28 130.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 6.00 150.00 143.75 125.00 STMR200-246 R2–2018 CRITICAL CULVERTS REP 09/20/18 10.00 150.00 125.00 125.00 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 35.00 255.00 116.50 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,852.00 162.16 154.25 158.75 NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 50.00 145.00 139.00 160.00 BR1131-006 SH 113 AT MP 11.5 10/11/18 10.00 125.00 126.57 87.50 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 32.00 150.00 95.00 72.00 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 40.00 150.00 145.00 150.00 SHE2254-092 SH225 AND 17TH PLACE IMPROVEM 10/18/18 20.00 154.03 123.33 75.00 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 20.00 150.00 127.11 69.40 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 10.00 150.00 157.60 140.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 160.00 135.00 147.00 180.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 60.00 135.00 207.31 300.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 236.00 130.00 97.17 95.00 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 40.00 140.00 177.66 195.32 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 50.00 110.00 168.33 5.00 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 100.00 150.00 120.69 10.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 150.00 160.00 138.67 100.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 120.00 135.00 145.85 96.80 ER052A-039 SH 170 11/15/18 20.00 135.00 152.00 133.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 200.00 194.25 207.90 207.90 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 30.00 100.00 184.47 220.87 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 30.00 150.00 128.00 160.00 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 8.00 150.00 207.50 300.00 C R500-198 R5 GUARDRAIL REPLACEMENT/UPGR 11/29/18 40.00 175.00 155.00 125.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 160.00 140.00 188.51 200.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 120.00 150.00 122.12 50.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 40.00 110.00 177.79 175.88 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 140.00 170.00 172.69 215.00 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 12.00 110.00 145.39 120.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 120.00 155.00 174.66 94.62 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 73.00 160.00 80.00 80.00 STAR100-279 FY20 HMA PREVENTATIVE MAINTEN 12/13/18 70.00 150.00 120.00 140.00 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 60.00 170.00 133.93 130.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 2,100.00 157.05 157.05 157.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,321.00 153.09 149.28 145.94 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,898.00 155.64 151.92 150.98 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 136 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00107 Rem Trash Hour =================================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 8.00 100.00 137.25 80.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 20.00 55.00 113.33 125.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 40.00 80.00 126.63 200.00 ER1151-033 PR SH 115-MP 34.7 01/25/18 30.00 63.33 59.11 46.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 39.00 62.00 119.54 115.45 C0703-440 AVALANCHE CONTROL SYSTEM: EJM 02/01/18 20.00 250.00 112.85 110.00 NHPP5502-096 US550 STRIPING & RUMBLE STRIP 03/01/18 20.00 60.00 109.50 83.00 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 24.00 125.00 106.00 175.00 NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 20.00 90.00 103.67 138.16 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 10.00 40.00 101.48 105.00 NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 8.00 100.00 143.33 45.00 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 20.00 187.90 200.00 200.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 10.00 110.00 190.00 180.00 NHPP 0703-449 I-70 BRIDGE REPAIRS MP 244.2 03/29/18 30.00 125.00 89.63 54.88 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 299.00 101.09 110.65 122.75 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 20.00 100.00 98.20 65.00 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 130.00 55.00 66.29 113.95 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 40.00 87.00 48.55 29.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 10.00 150.00 80.68 51.70 STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 1.00 200.00 104.25 42.00 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 4.00 100.00 91.13 63.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 25.00 40.00 164.84 164.37 MTCE R100-312 R1 CHIP SEAL 05/17/18 10.00 105.00 150.00 150.00 ER055A-001 PR SH 55 FLOOD REPAIR 2015 06/28/18 30.00 50.00 78.56 175.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 270.00 67.70 73.81 107.20 NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 5.00 150.00 55.00 55.00 FBR060A-022 SH 60 over the South Platte 07/12/18 40.00 40.00 144.50 100.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 10.00 80.00 78.31 37.50 SHE0701-245 I-70 MEDIAN CABLE RAIL INSTAL 07/12/18 20.00 30.00 100.00 100.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 20.00 50.00 75.83 95.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 10.00 118.00 276.38 279.15 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 10.00 100.00 113.50 42.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 50.00 97.00 90.43 100.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 121.00 90.00 57.97 70.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 137 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00107 Rem Trash Hour =================================================== NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 5.00 55.00 45.00 45.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 30.00 87.00 109.20 75.00 STMR200-246 R2–2018 CRITICAL CULVERTS REP 09/20/18 40.00 75.00 45.00 45.00 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 8.00 123.00 97.75 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 369.00 80.05 98.90 82.67 NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 5.00 100.00 180.00 175.00 BR1131-006 SH 113 AT MP 11.5 10/11/18 10.00 75.00 71.94 37.50 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 40.00 80.00 137.50 80.00 SHE2254-092 SH225 AND 17TH PLACE IMPROVEM 10/18/18 5.00 122.75 99.67 54.00 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 10.00 100.00 153.90 181.58 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 80.00 130.00 122.03 71.10 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 10.00 70.00 134.80 220.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 40.00 90.00 78.81 70.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 40.00 85.00 61.51 45.00 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 50.00 270.00 59.00 40.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 150.00 90.00 106.50 75.00 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 10.00 65.00 200.12 126.47 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 20.00 45.00 69.00 125.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 20.00 50.00 161.79 75.38 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 5.00 100.00 119.13 125.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 140.00 100.00 97.41 52.00 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 12.00 30.00 133.45 55.00 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 20.00 120.00 43.33 40.00 STAR100-279 FY20 HMA PREVENTATIVE MAINTEN 12/13/18 20.00 100.00 82.50 45.00 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 20.00 115.00 83.57 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 707.00 106.47 100.11 69.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,645.00 93.20 94.60 88.43 =============== 208-00200 Erosion Control Management LUMP SUM =============================================== C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 1.00 840611.70 840611.70 840611.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 840611.70 840611.70 840611.70 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 1141169.40 1141169.40 1141169.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1141169.40 1141169.40 1141169.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 990890.55 990890.55 990890.55 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 138 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00207 Erosion Control Management Day ==================================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 7.00 200.00 744.35 888.70 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 35.00 275.00 88.33 50.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 13.00 500.00 731.03 795.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 36.00 250.00 618.75 300.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 198.00 165.00 91.59 50.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 60.00 230.00 182.61 48.00 MTCER100-296 MTCE R1 FY18 WEST SIGN REPLAC 01/11/18 12.00 300.00 151.75 30.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 60.00 250.00 307.75 150.00 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 66.00 300.00 129.85 92.50 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 169.00 250.00 186.91 100.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 290.00 250.00 143.62 164.37 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 90.00 250.00 346.15 205.70 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 90.00 200.00 434.09 280.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 169.00 250.00 169.50 50.00 NHPP5502-096 US550 STRIPING & RUMBLE STRIP 03/01/18 8.00 225.00 372.50 390.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 220.00 190.00 223.00 25.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 40.00 215.00 269.90 410.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 30.00 150.00 420.20 336.00 NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 20.00 250.00 940.00 160.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 20.00 200.00 391.18 282.35 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 60.00 250.00 225.00 325.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,693.00 230.12 216.96 140.30 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 90.00 300.00 564.10 510.00 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 33.00 300.00 207.43 158.31 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 96.00 300.00 111.75 100.00 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 60.00 150.00 130.00 100.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 85.00 200.00 183.75 302.50 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 86.00 260.00 135.92 53.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 5.00 220.00 318.75 225.00 NHPP0703-436 EJMT PLENUM WATERPROOFING MEM 06/28/18 50.00 150.00 370.50 435.00 ER055A-001 PR SH 55 FLOOD REPAIR 2015 06/28/18 20.00 200.00 343.57 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 525.00 241.26 241.85 234.04 FBR060A-022 SH 60 over the South Platte 07/12/18 155.00 175.00 183.88 100.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 18.00 225.00 282.00 110.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 139 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00207 Erosion Control Management Day ==================================================== SHE0701-245 I-70 MEDIAN CABLE RAIL INSTAL 07/12/18 40.00 200.00 165.00 165.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 12.00 200.00 346.67 180.00 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 30.00 250.00 325.55 80.00 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 70.00 250.00 230.00 150.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 172.00 173.00 97.29 225.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 161.00 300.00 172.81 300.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 30.00 250.00 178.91 200.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 191.00 100.00 156.20 25.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 10.00 250.00 426.00 190.00 STMR200-246 R2–2018 CRITICAL CULVERTS REP 09/20/18 40.00 175.00 175.00 175.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 929.00 194.54 161.50 156.96 BR1131-006 SH 113 AT MP 11.5 10/11/18 40.00 200.00 199.76 87.50 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 150.00 150.00 489.10 167.30 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 54.00 200.00 216.16 230.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 60.00 185.00 262.71 210.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 472.00 190.00 218.90 425.00 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 30.00 180.00 691.33 682.66 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 75.00 200.00 205.72 267.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 300.00 220.00 211.29 78.71 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 30.00 150.00 205.53 211.75 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 230.00 336.53 344.27 344.27 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 45.00 250.00 227.93 258.70 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 23.00 80.00 247.00 250.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 15.00 225.00 315.07 210.00 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 50.00 50.00 218.14 125.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 365.00 250.00 237.63 85.50 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 75.00 375.00 480.34 713.35 STA052A-045 SH 52B NEW RAYMER SOUTH 12/13/18 30.00 250.00 361.67 520.00 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 100.00 250.00 122.86 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,144.00 224.45 245.54 254.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,291.00 222.68 214.49 198.86 =============== 208-00300 Temporary Berms Lin Foot =============================================== ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 412.00 15.00 3.60 2.50 STA0342-060 US 34D OVERLAY AND BRIDGE WOR ER144A-002 SH 144 East and West of Goodr 03/08/18 8,485.00 4.50 1.93 0.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8,897.00 4.99 1.97 0.45 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 140 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00300 Temporary Berms Lin Foot =============================================== FBR060A-022 SH 60 over the South Platte 07/12/18 3,500.00 3.00 2.76 2.50 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 8,500.00 3.36 3.36 3.36 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12,000.00 3.26 2.86 3.11 BR1131-006 SH 113 AT MP 11.5 10/11/18 800.00 5.50 6.63 6.25 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 350.00 2.00 5.82 6.27 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 319,750.00 1.00 0.79 0.48 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 14,445.00 3.36 3.36 3.36 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 335,345.00 1.11 0.88 0.62 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 356,242.00 1.28 1.05 0.70 =============== 208-00301 Temporary Diversion Lin Foot =============================================== CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 575.00 336.57 350.00 350.00 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 550.00 146.69 200.00 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,125.00 243.74 276.67 276.67 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 1,450.00 275.00 80.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,450.00 275.00 80.00 100.00 M850-027 US24E MANITOU AVE. AT RUXTON 08/28/18 1.00 75000.00 102136.57 64000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 75000.00 102136.57 64000.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 600.00 100.00 56.13 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 600.00 100.00 56.13 18.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,176.00 254.39 134.68 167.21 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 141 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00303 Temporary Diversion (Special) Lin Foot =============================================== ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 250.00 417.19 380.00 380.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 250.00 417.19 380.00 380.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 250.00 417.19 380.00 380.00 =============== 208-00400 Water Control LUMP SUM =============================================== STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 1.00 90000.00 168068.35 50000.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 1.00 80000.00 114312.50 120000.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 1.00 16000.00 19333.33 11000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 62000.00 116524.12 60333.33 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 1.00 80000.00 70812.50 70000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 80000.00 70812.50 70000.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 1.00 10000.00 33242.86 10000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 10000.00 33242.86 10000.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 1.00 50000.00 88791.67 150000.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 66197.97 75855.52 75855.52 STA086A-051 SH 86; WEST OF I-70 11/29/18 1.00 12500.00 20865.73 650.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 42899.32 56446.14 75501.84 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 50587.25 78086.89 60938.19 =============== 208-00520 Temp Stream Crossing LUMP SUM =============================================== CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 1.00 189881.85 225000.00 225000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 189881.85 225000.00 225000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 189881.85 225000.00 225000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 142 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 209-00600 Dust Palliative (Mg Cl) Gallon ================================================= STA052A-040 SH 52: Antelope Creek 08/23/18 20,000.00 1.00 1.28 1.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20,000.00 1.00 1.28 1.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20,000.00 1.00 1.28 1.25 =============== 210-00001 Res Structure Each =================================================== NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 1.00 1250.00 3630.00 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 1250.00 3630.00 3000.00 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 1.00 1000.00 5502.61 565.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 1.00 4000.00 3548.20 3124.81 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 2500.00 4633.98 1844.91 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 2083.33 4382.99 2229.94 =============== 210-00010 Res Mailbox Str Each =================================================== ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 3.00 175.00 294.60 300.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 175.00 294.60 300.00 FBR060A-022 SH 60 over the South Platte 07/12/18 2.00 90.00 331.84 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 90.00 331.84 300.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 1.00 200.00 435.37 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 200.00 435.37 350.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 150.83 328.48 308.33 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 143 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00011 Res Mailbox Str (Ty 1) Each =================================================== NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 13.00 300.00 267.07 350.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 13.00 200.00 207.91 290.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 26.00 250.00 227.63 320.00 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 1.00 230.00 255.00 175.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 10.00 300.00 254.58 251.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 11.00 293.64 254.64 244.32 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 37.00 262.97 232.58 297.50 =============== 210-00012 Res Mailbox Str (Ty 2) Each =================================================== ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 3.00 350.00 256.81 360.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 350.00 256.81 360.00 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 3.00 450.00 390.00 400.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 2.00 500.00 509.17 502.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 470.00 449.58 441.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 425.00 321.07 410.63 =============== 210-00013 Res Mailbox Str (Ty 3) Each =================================================== STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 7.00 500.00 621.54 600.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 3.00 450.00 342.22 559.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 14.00 500.00 441.47 465.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 24.00 493.75 466.10 516.13 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 1.00 550.00 375.00 250.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 144 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00013 Res Mailbox Str (Ty 3) Each =================================================== STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 1.00 700.00 611.00 603.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 625.00 463.50 426.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26.00 503.85 465.92 509.23 =============== 210-00014 Res Mailbox Str (Ty 4) Each =================================================== NHPP1602-166 US 160 JCT 172 TO BAYFIELD RE 03/08/18 30.00 600.00 501.88 450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 30.00 600.00 501.88 450.00 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 44.00 500.00 450.00 600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 44.00 500.00 450.00 600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 74.00 540.54 479.93 539.19 =============== 210-00015 Res End Section Each =================================================== NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 4.00 800.00 1275.63 465.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 800.00 1275.63 465.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 800.00 1275.63 465.00 =============== 210-00035 Res Water Meter Each =================================================== STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 6.00 1500.00 1490.00 750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 1500.00 1490.00 750.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 1500.00 1490.00 750.00 =============== 210-00050 Res Fire Hydrant Each =================================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 9060.92 9062.50 9062.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 145 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00050 Res Fire Hydrant Each =================================================== STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 1.00 4000.00 4103.96 3000.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 5.00 3000.00 4930.66 1132.13 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 7.00 4008.70 4963.66 2531.88 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 4008.70 4963.66 2531.88 =============== 210-00066 Reset Monument Box Each =================================================== STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 11.00 500.00 964.06 600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 11.00 500.00 964.06 600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 500.00 964.06 600.00 =============== 210-00090 Res Delineator Each =================================================== SHE0701-245 I-70 MEDIAN CABLE RAIL INSTAL 07/12/18 25.00 30.00 42.00 42.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 25.00 30.00 42.00 42.00 C R500-198 R5 GUARDRAIL REPLACEMENT/UPGR 11/29/18 42.00 40.00 31.13 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 42.00 40.00 31.13 30.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 67.00 36.27 33.62 34.48 =============== 210-00300 Res Brick Pavers Sq Yard ================================================ NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 9.00 100.00 100.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9.00 100.00 100.00 100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 100.00 100.00 100.00 =============== 210-00420 Res Timbers LUMP SUM =============================================== ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 1.00 5000.00 6551.25 12000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 146 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00420 Res Timbers LUMP SUM =============================================== STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 5000.00 6551.25 12000.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 1.00 5000.00 3666.67 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 5000.00 3666.67 5000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 5000.00 5315.00 8500.00 =============== 210-00425 Res Bridge Railing Lin Foot =============================================== NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 39.00 180.00 351.17 55.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 482.00 50.00 48.47 90.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 179.00 70.00 73.11 49.19 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 700.00 62.36 71.50 77.61 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 700.00 62.36 71.50 77.61 =============== 210-00442 Patch Bridge Curb Lin Foot =============================================== STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 7.00 120.00 125.71 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 7.00 120.00 125.71 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 120.00 125.71 50.00 =============== 210-00473 Res TV Cameras Each =================================================== C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 1.00 5828.04 5828.04 5828.04 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 5828.04 5828.04 5828.04 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 1.00 1000.00 1151.54 1100.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 5769.75 5769.75 5769.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 3384.88 2075.18 3434.88 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 4199.26 2700.66 4232.60 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 147 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00475 Res CCTV Pole Each =================================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 5.00 6125.70 6125.70 6125.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 6125.70 6125.70 6125.70 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 6125.70 6125.70 6125.70 =============== 210-00476 Reset MVRD Each =================================================== STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 2.00 1450.00 1126.00 1600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 1450.00 1126.00 1600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1450.00 1126.00 1600.00 =============== 210-00479 Res Radio Com Antenna Each =================================================== NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPL 04/05/18 1.00 750.00 707.67 673.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 750.00 707.67 673.00 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 2.00 750.00 1163.25 1195.50 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 2.00 750.00 883.75 750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 750.00 976.92 972.75 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 4.00 750.00 792.11 785.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 750.00 792.11 785.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 750.00 848.23 856.00 =============== 210-00500 Reb Port Present Str Each =================================================== ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 2.00 2000.00 5781.25 7500.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 148 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00500 Reb Port Present Str Each =================================================== STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 2000.00 5781.25 7500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 2000.00 5781.25 7500.00 =============== 210-00520 Reb Port Present Str Sq Yard ================================================ STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 47.00 4000.00 2792.06 1600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 47.00 4000.00 2792.06 1600.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 1.00 2000.00 5161.53 9884.60 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 2.00 4500.00 2845.00 690.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 3666.67 3837.80 3754.87 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 3980.00 2829.60 1729.29 =============== 210-00530 Rebuild Port of Present Str Sq Foot ================================================ ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 2,195.00 165.00 59.99 84.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,195.00 165.00 59.99 84.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 60.00 430.00 646.15 624.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 60.00 430.00 646.15 624.60 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 3.00 200.00 1575.67 1575.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 200.00 1575.67 1575.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,258.00 172.09 73.74 100.35 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 149 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00750 Res Light Standard Each =================================================== SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 3.00 1000.00 1433.33 1400.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 15.00 800.00 1406.99 1448.81 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 4.00 1500.00 2272.50 2350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 22.00 954.55 1465.69 1606.01 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 4.00 2000.00 955.64 690.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 2.00 2000.00 1285.72 1300.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 1.00 2000.00 4381.04 4361.28 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 4.00 1400.00 2798.81 2575.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 1.00 2250.00 3106.88 3000.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 2199.75 2199.75 2199.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 13.00 1849.98 2172.90 1940.08 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 35.00 1287.14 1690.89 1730.09 =============== 210-00760 Res Luminaire Each =================================================== STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 9.00 395.00 348.33 275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9.00 395.00 348.33 275.00 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 2.00 500.00 289.50 352.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 500.00 289.50 352.00 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 3.00 350.00 265.52 255.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 231.00 231.00 231.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 320.25 263.36 249.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15.00 389.07 314.40 278.33 =============== 210-00810 Res Ground Sign Each =================================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 1.00 350.00 515.25 630.49 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 150 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00810 Res Ground Sign Each =================================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 1.00 300.00 542.50 500.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 1.00 300.00 165.50 79.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 9.00 300.00 132.80 105.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 1.00 250.00 303.26 450.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 5.00 250.00 314.44 272.29 STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 8.00 200.00 203.33 225.00 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 1.00 300.00 472.39 800.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 1.00 250.00 312.16 450.00 ER144A-002 SH 144 East and West of Goodr 03/08/18 2.00 250.00 429.15 350.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 9.00 200.00 344.00 394.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 7.00 150.00 88.50 92.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 46.00 231.52 276.71 258.82 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 5.00 200.00 216.40 122.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 1.00 280.00 364.82 240.00 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 30.00 250.00 532.50 390.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 36.00 243.89 458.88 348.61 NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 3.00 300.00 500.00 500.00 FBR060A-022 SH 60 over the South Platte 07/12/18 9.00 250.00 242.59 185.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 3.00 325.00 273.33 290.00 C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 1.00 250.00 415.00 610.00 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 7.00 175.00 294.88 291.50 STM0252-469 R2 ADA RAMPS I-25 INT S NEV- 09/06/18 3.00 261.00 360.00 450.00 NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 4.00 250.00 750.00 750.00 NHPP070A-032 I-70B & Z GRAND JCT PHASE 1 A 09/20/18 8.00 250.00 291.00 200.00 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 9.00 260.00 396.00 235.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 47.00 249.43 298.69 313.84 NHPP006A-064 US 6 MACK TO FRUITA 10/18/18 2.00 200.00 180.00 175.00 SHER200-243 R2 WRONG WAY PREVENTION 10/18/18 77.00 400.00 225.00 250.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 2.00 260.00 322.38 312.15 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 3.00 250.00 229.11 165.00 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 1.00 400.00 375.00 270.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 5.00 250.00 103.00 165.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 151 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00810 Res Ground Sign Each =================================================== C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 8.00 200.00 150.68 212.40 ER052A-039 SH 170 11/15/18 2.00 250.00 229.83 133.00 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 10.00 400.00 250.00 250.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 3.00 410.41 378.86 378.86 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 3.00 300.00 274.87 435.47 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 13.00 300.00 287.00 350.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 27.00 280.00 310.03 285.00 C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 3.00 250.00 260.40 347.00 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 7.00 200.00 273.00 320.00 MPR200-252 REGION 2 - PUEBLO COUNTY HIGH 12/20/18 1.00 300.00 350.00 225.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 167.00 336.89 241.92 266.31 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 296.00 295.32 284.71 282.70 =============== 210-00815 Res Sign Panel Each =================================================== BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 8.00 280.00 150.36 58.83 STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 1.00 125.00 118.33 125.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 15.00 150.00 69.34 41.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E MTCER500-201 R5 FY18 SIGN REPLACEMENT 03/08/18 6.00 100.00 64.00 35.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 7.00 200.00 1426.14 2052.27 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 7.00 250.00 197.50 205.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 44.00 190.11 170.74 391.40 NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPL 04/05/18 3.00 30.00 146.00 197.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 8.00 180.00 103.38 131.50 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 12.00 200.00 118.00 118.00 MTCER300-244 MTCE R3 FY 18/19 REGIONWIDE S 05/31/18 5.00 60.00 106.67 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 28.00 151.07 112.32 127.11 SHE0701-245 I-70 MEDIAN CABLE RAIL INSTAL 07/12/18 15.00 150.00 150.00 150.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 5.00 185.00 90.52 35.00 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 2.00 400.00 1057.25 175.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 22.00 180.68 239.24 126.14 SHER200-243 R2 WRONG WAY PREVENTION 10/18/18 264.00 40.00 37.50 45.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 152 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00815 Res Sign Panel Each =================================================== SHE2254-092 SH225 AND 17TH PLACE IMPROVEM 10/18/18 2.00 391.40 1583.33 1200.00 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 5.00 250.00 185.00 90.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 2.00 350.00 1088.63 175.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 53.00 135.00 159.41 263.39 STA052A-045 SH 52B NEW RAYMER SOUTH 12/13/18 2.00 125.00 169.67 165.00 MPR200-252 REGION 2 - PUEBLO COUNTY HIGH 12/20/18 20.00 45.00 59.67 29.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 13.00 58.63 58.63 58.63 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 361.00 61.94 94.27 85.07 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 455.00 85.56 117.72 119.27 =============== 210-00816 Res Sign Panel (Spec) Each =================================================== C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 1.00 2625.00 2625.00 2625.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 2625.00 2625.00 2625.00 NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 1.00 500.00 2056.00 800.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 17.00 3442.56 3442.56 3442.56 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 18.00 3279.08 3296.61 3295.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19.00 3244.66 3263.03 3260.45 =============== 210-00820 Res Var Mesg Sign Each =================================================== C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 1.00 35159.09 35159.09 35159.09 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 35159.09 35159.09 35159.09 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 1.00 5000.00 26889.63 26000.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 45307.50 45307.50 45307.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 25153.75 30573.21 35653.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 28488.86 31337.52 35488.86 =============== 210-00825 Res Flashing Beacon Each =================================================== ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 1.00 1500.00 1869.40 1405.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 153 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00825 Res Flashing Beacon Each =================================================== STA0342-060 US 34D OVERLAY AND BRIDGE WOR -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1500.00 1869.40 1405.00 FSA0711-020 SH 71 & SH 94: PUNKIN CENTER 05/03/18 4.00 1400.00 2166.67 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 1400.00 2166.67 3000.00 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 2.00 2000.00 1141.67 750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 2000.00 1141.67 750.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 1585.71 1834.65 2129.29 =============== 210-00827 Res Pull Box Each =================================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 4.00 500.00 607.50 700.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 1.00 750.00 1066.67 1100.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 1.00 785.00 863.80 335.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 1.00 750.00 3265.63 252.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 1.00 300.00 602.50 400.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 573.13 1080.77 610.88 C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 3.00 500.00 961.50 446.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 2.00 550.00 1309.38 700.00 STM0252-469 R2 ADA RAMPS I-25 INT S NEV- 09/06/18 5.00 465.00 925.00 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 492.50 1042.10 773.80 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 14.00 740.56 735.00 735.00 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 5.00 550.00 269.78 296.12 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 154 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00827 Res Pull Box Each =================================================== C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 3.00 450.00 314.40 312.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 22.00 657.63 416.36 577.57 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 599.45 765.66 633.29 =============== 210-00831 Res Traf Sig Head Each =================================================== FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 5.00 200.00 255.12 296.21 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 200.00 255.12 296.21 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 200.00 255.12 296.21 =============== 210-00840 Res Traf Sig Pole Each =================================================== FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 1.00 3000.00 4870.19 5937.76 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 3081.75 3081.75 3081.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 3040.88 4512.50 4509.76 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 3040.88 4512.50 4509.76 =============== 210-00842 Res Traf Sig Mast Arm Each =================================================== FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 2.00 750.00 542.71 444.32 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 750.00 542.71 444.32 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 750.00 542.71 444.32 =============== 210-00847 Res Trav Time Ind Each =================================================== C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 3.00 4604.09 4604.09 4604.09 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 4604.09 4604.09 4604.09 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 6.00 1200.00 5039.05 4900.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 155 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00847 Res Trav Time Ind Each =================================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 8.00 4558.05 4558.05 4558.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 14.00 3118.89 4918.80 4704.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17.00 3380.98 4891.83 4686.86 =============== 210-00855 Res Traf Sig Control Cab Each =================================================== NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 1.00 3000.00 5416.67 1400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 3000.00 5416.67 1400.00 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 1.00 4100.00 5073.33 5900.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 2.00 4620.00 4620.00 4620.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 4446.67 4892.00 5046.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 4085.00 5088.75 4135.00 =============== 210-00859 Mod Ped Push Button Each =================================================== STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 5.00 100.00 216.03 296.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 100.00 216.03 296.12 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 100.00 216.03 296.12 =============== 210-00860 Res Ped Push Button Each =================================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 7.00 500.00 345.00 200.00 STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 1.00 145.00 416.67 175.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 455.63 357.65 196.88 C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 13.00 125.00 235.50 88.00 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 33.00 250.00 166.75 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 46.00 214.67 186.18 64.33 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 156 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00860 Res Ped Push Button Each =================================================== STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 18.00 100.00 49.29 52.26 C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 17.00 110.00 63.40 65.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 4.00 100.00 79.74 80.22 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 39.00 104.36 59.04 60.68 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 93.00 189.14 135.16 74.20 =============== 210-00861 Reset Wiring LUMP SUM =============================================== FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 1.00 5000.00 7799.83 9392.31 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 5000.00 7799.83 9392.31 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5000.00 7799.83 9392.31 =============== 210-00865 Res Ped Sig Head Each =================================================== STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 1.00 175.00 170.00 225.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 175.00 170.00 225.00 STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 4.00 250.00 439.00 538.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 250.00 439.00 538.00 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 2.00 250.00 81.32 87.09 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 4.00 250.00 131.87 80.22 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 250.00 115.02 82.51 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 243.18 193.78 261.10 =============== 210-00866 Res Fire Preempt Unit+Timer Each =================================================== NHPP072A-042 SH72:64TH/INDIANA SIGNAL REPL 04/05/18 2.00 3500.00 506.67 380.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 3500.00 506.67 380.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 157 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00866 Res Fire Preempt Unit+Timer Each =================================================== STA141A-045 SH 141 CLIFTON SIGNAL REPLACE 08/09/18 3.00 1000.00 937.00 856.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 1000.00 937.00 856.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 2000.00 721.83 665.60 =============== 210-00867 Res Fire Preempt Unit Each =================================================== NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 1.00 1000.00 457.50 475.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1000.00 457.50 475.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 3.00 1000.00 401.24 399.97 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 1000.00 401.24 399.97 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 1.00 1000.00 566.00 750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1000.00 566.00 750.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 1000.00 444.11 484.98 =============== 210-00890 Res Int Detect Sys (Camera) Each =================================================== STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 1.00 1100.00 818.33 1025.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1100.00 818.33 1025.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1100.00 818.33 1025.00 =============== 210-01000 Res Fence Lin Foot =============================================== STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 190.00 10.00 8.22 7.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 158 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-01000 Res Fence Lin Foot =============================================== ER1151-033 PR SH 115-MP 34.7 01/25/18 160.00 8.50 6.58 7.50 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 110.00 30.00 27.05 22.87 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 60.00 30.00 27.52 40.00 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 30.00 35.00 455.75 430.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 1,180.00 8.00 9.08 8.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,730.00 10.90 14.75 17.22 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 171.00 35.00 9.00 10.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 60.00 18.00 14.40 7.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 231.00 30.58 11.61 9.40 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 100,376.00 2.00 1.82 0.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 100,376.00 2.00 1.82 0.45 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 1,600.00 20.00 5.88 5.64 NHPP0702-366 I-70 Avon to Vail 11/08/18 614.00 20.00 49.25 115.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 100.00 50.00 18.67 20.11 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 122.00 40.00 13.25 20.00 ER052A-039 SH 170 11/15/18 40.00 15.00 24.65 6.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 132.00 20.00 5.38 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,608.00 22.01 18.71 32.59 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 104,945.00 2.71 2.83 1.54 =============== 210-01011 Res Gate Each =================================================== NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 1.00 450.00 423.33 600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 450.00 423.33 600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 450.00 423.33 600.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 159 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-01050 Res C L Fence Lin Foot =============================================== NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 150.00 15.00 17.45 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 150.00 15.00 17.45 14.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 39.00 50.00 70.33 65.00 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 60.00 15.00 27.86 27.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 99.00 28.79 43.06 41.97 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 249.00 20.48 35.00 25.12 =============== 210-01130 Res Gdrail Ty 3 Lin Foot =============================================== ER1151-033 PR SH 115-MP 34.7 01/25/18 103.00 12.00 38.46 38.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 103.00 12.00 38.46 38.00 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 63.00 60.00 307.23 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 63.00 60.00 307.23 150.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 166.00 30.22 140.46 80.51 =============== 210-01170 Res Gdrail Ty 7 Lin Foot =============================================== FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 400.00 15.00 16.89 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 400.00 15.00 16.89 5.00 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 16.00 120.00 305.00 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16.00 120.00 305.00 140.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 160 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-01170 Res Gdrail Ty 7 Lin Foot =============================================== NHPP0702-366 I-70 Avon to Vail 11/08/18 100.00 10.00 41.95 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 100.00 10.00 41.95 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 516.00 17.29 26.64 17.91 =============== 210-01180 Reset Guardrail (Special) Lin Foot =============================================== NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 450.00 20.00 83.33 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 450.00 20.00 83.33 15.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 450.00 20.00 83.33 15.00 =============== 210-01190 Reset Tensioned Cable Barrier Lin Foot =============================================== NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 200.00 15.00 219.75 239.50 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 44,138.00 17.59 17.59 17.59 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 44,338.00 17.58 19.41 18.59 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 44,338.00 17.58 19.41 18.59 =============== 210-01200 Res End Anchorage Each =================================================== NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 1.00 1830.00 3988.33 1500.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 12.00 6053.94 6053.94 6053.94 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 13.00 5729.02 5365.40 5703.64 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13.00 5729.02 5365.40 5703.64 =============== 210-01710 Res Valve Each =================================================== STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 5.00 600.00 1560.00 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 600.00 1560.00 500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 600.00 1560.00 500.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 161 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-02510 Relay Sprinkler System LUMP SUM =============================================== STAM086-076 PUEBLO FY17/18 SIGNAL CAPITAL 02/08/18 1.00 500.00 3091.67 275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 500.00 3091.67 275.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 1.00 4000.00 12000.00 12000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 4000.00 12000.00 12000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 3125.00 7545.83 9068.75 =============== 210-02804 Grinding: Sidwlk and/or Curb Ramp Repair Lin Foot =============================================== C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 75.00 30.00 45.75 13.00 NHPP070A-032 I-70B & Z GRAND JCT PHASE 1 A 09/20/18 852.00 50.00 6.50 4.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 927.00 48.38 12.38 5.19 C2873-192 LOVELAND ADA CURB RAMPS PHASE 12/06/18 43.00 50.00 44.60 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 43.00 50.00 44.60 20.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 970.00 48.45 15.50 5.84 =============== 210-02900 Relay Riprap Cubic Yard ============================================= ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 12.00 50.00 120.97 60.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12.00 50.00 120.97 60.00 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 35.00 60.00 72.37 90.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 80.00 49.04 49.05 49.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 115.00 52.38 65.05 61.51 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 127.00 52.15 80.34 61.37 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 162 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-04010 Adj Manhole Each =================================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 22.00 500.00 2800.00 4500.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 14.00 600.00 1022.40 1500.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 3.00 1500.00 1810.86 2139.26 FSA070A-029 SH70A PECOS ROUNDABOUT IMPROV 03/01/18 2.00 1000.00 950.00 900.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 6.00 1000.00 738.03 700.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 1.00 800.00 980.00 860.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 48.00 681.25 1439.28 2776.62 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 90.00 550.00 526.26 350.03 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 1.00 1200.00 5500.00 5500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 91.00 557.14 540.04 406.62 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 9.00 800.00 1278.70 900.00 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 3.00 900.00 525.00 225.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.00 825.00 1090.28 731.25 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 4.00 765.00 1213.00 1050.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 1.00 1000.00 1065.83 575.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 5.00 2984.78 2985.29 2985.29 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 101.00 600.00 741.45 718.81 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 1.00 714.00 2010.00 500.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 160.00 500.00 714.06 400.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 6.00 1000.00 1262.31 2288.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 278.00 598.19 766.35 613.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 429.00 605.12 803.53 814.89 =============== 210-04015 Modify Manhole Each =================================================== NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 1.00 2000.00 7500.00 7500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 2000.00 7500.00 7500.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 163 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-04015 Modify Manhole Each =================================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 2.00 2984.78 2985.29 2985.29 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 1.00 3500.00 2627.81 2288.25 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 2940.00 2940.00 2940.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 3102.39 2774.55 2799.71 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 2881.91 3365.23 3739.77 =============== 210-04016 Modify Manhole (Spec) Each =================================================== STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 20.00 2500.00 1416.58 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 20.00 2500.00 1416.58 1000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 2500.00 1416.58 1000.00 =============== 210-04020 Modify Inlet Each =================================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 1.00 1800.00 1751.40 1502.79 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 1.00 3220.00 2412.00 2000.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 30.00 2800.00 5560.56 2813.14 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 2.00 4000.00 2700.00 3200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 34.00 2853.53 5403.08 2773.44 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 5.00 85.00 1900.00 2200.00 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 1.00 3000.00 4208.82 3835.29 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 1.00 4000.00 8000.00 8000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7.00 1060.71 2922.35 3262.18 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 10.00 2625.00 2625.00 2625.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 2625.00 2625.00 2625.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 164 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-04020 Modify Inlet Each =================================================== NHPP006A-066 US 6: I-25 TO PERRY WB OPS IM 10/04/18 3.00 3400.00 15087.50 13000.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 6.00 3100.00 3854.94 840.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 9.00 2000.00 4655.67 2120.00 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 9.00 1500.00 3500.00 3500.00 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 3.00 2000.00 7802.34 8209.34 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 5.00 3000.00 3320.00 5000.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 7.00 2625.00 2625.00 2625.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 42.00 2373.21 4865.90 3871.98 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 93.00 2477.10 5054.54 3290.38 =============== 210-04025 Modify Structure Each =================================================== BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 2.00 1600.00 5485.50 6066.98 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 2.00 2000.00 4131.55 6000.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 1800.00 4763.40 6033.49 NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 2.00 5000.00 17314.96 15000.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 1.00 4500.00 5553.35 6000.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 7.00 3675.00 3675.00 3675.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 4022.50 10528.00 6172.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 3387.50 7137.06 6132.78 =============== 210-04035 Modify Guardrail (Spec) Lin Foot =============================================== BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 4,561.00 18.00 16.63 16.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,561.00 18.00 16.63 16.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,561.00 18.00 16.63 16.15 =============== 210-04050 Adj Valve Box Each =================================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 6.00 400.00 1557.50 2400.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 165 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-04050 Adj Valve Box Each =================================================== ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 16.00 350.00 474.00 650.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 22.00 363.64 615.33 1127.27 STA 177A-011 SH 177 Arapahoe to Hampden Re 05/10/18 154.00 350.00 269.68 188.71 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 4.00 500.00 1800.00 1800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 158.00 353.80 279.55 229.50 NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 1.00 600.00 500.00 500.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 9.00 450.00 1033.30 600.00 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 8.00 500.00 393.75 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 18.00 480.56 728.97 394.44 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 6.00 550.00 414.35 420.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 5.00 400.00 653.29 375.00 C5502-098 US 550/160 PEDESTRIAN SIDEWAL 11/15/18 2.00 550.00 500.00 500.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 6.00 102.34 102.35 102.35 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 91.00 350.00 445.83 262.32 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 170.00 500.00 340.88 200.00 STR112A-001 SH 112 FROM US 285 TO SH 17 12/06/18 2.00 600.00 592.92 753.76 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 15.00 350.00 498.91 1109.63 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 297.00 438.77 392.63 276.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 495.00 409.83 379.18 303.42 =============== 210-04051 Adj Valve Box (Spec) Each =================================================== NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 2.00 550.00 559.17 425.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 550.00 559.17 425.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 550.00 559.17 425.00 =============== 210-04060 Adj Water Meter Each =================================================== STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 1.00 600.00 1066.48 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 600.00 1066.48 400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 600.00 1066.48 400.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 166 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-04070 Adjust Well Each =================================================== STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 7.00 1400.00 590.32 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 7.00 1400.00 590.32 300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 1400.00 590.32 300.00 =============== 210-04200 Adj Gdrail Lin Foot =============================================== ER1151-033 PR SH 115-MP 34.7 01/25/18 60.00 10.00 134.03 150.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 60.00 10.00 134.03 150.00 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 2,975.00 10.00 11.00 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,975.00 10.00 11.00 10.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,035.00 10.00 15.77 12.77 =============== 211-00100 Drilling Hole Lin Foot =============================================== STA086A-051 SH 86; WEST OF I-70 11/29/18 15.00 200.00 120.52 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 15.00 200.00 120.52 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15.00 200.00 120.52 50.00 =============== 211-01110 Rock Reinf (Dowels) Each =================================================== NHPPR100-241 I-70 , I-76, & I-270 BRIDGE P 12/06/18 3.00 600.00 1111.75 1250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 600.00 1111.75 1250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 600.00 1111.75 1250.00 =============== 211-01123 Rock Reinf (Perm A) Lin Foot =============================================== STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 1,310.00 130.00 172.40 155.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,310.00 130.00 172.40 155.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,310.00 130.00 172.40 155.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 167 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 211-01300 Rock Anchor Each =================================================== C0703-440 AVALANCHE CONTROL SYSTEM: EJM 02/01/18 65.00 2000.00 4156.96 1400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 65.00 2000.00 4156.96 1400.00 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 40.00 1000.00 1364.55 1931.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 40.00 1000.00 1364.55 1931.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 105.00 1619.05 2942.87 1602.57 =============== 211-02277 Cement Grout (Voids) Cubic Yard ============================================= NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 3.00 600.00 2408.33 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 600.00 2408.33 3000.00 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 65.00 1000.00 737.63 425.00 STMR200-246 R2–2018 CRITICAL CULVERTS REP 09/20/18 5.00 1500.00 1750.00 1750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 70.00 1035.71 756.73 519.64 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 73.00 1017.81 810.98 621.58 =============== 211-03005 Dewatering LUMP SUM =============================================== ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 1.00 50000.00 134633.53 65000.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 1.00 169112.99 135000.00 135000.00 ER144A-002 SH 144 East and West of Goodr 03/08/18 1.00 50000.00 39861.77 7242.30 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 1.00 415420.11 461700.00 461700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 171133.28 98146.20 167235.58 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 1.00 10000.00 18471.98 7362.85 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 168 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 211-03005 Dewatering LUMP SUM =============================================== ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 1.00 50000.00 29480.36 10272.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 30000.00 23609.22 8817.43 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 124088.85 63206.99 114429.53 =============== 212-00006 Seeding (Native) Acre =================================================== STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 0.80 2000.00 4710.00 14000.00 STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 0.10 5000.00 5250.00 4000.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 0.30 2000.00 2700.00 2700.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 0.50 3000.00 1696.89 1600.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 1.05 4000.00 1372.50 1600.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 5.10 900.00 664.44 455.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 4.30 780.00 943.80 800.00 MTCER100-296 MTCE R1 FY18 WEST SIGN REPLAC 01/11/18 0.10 8000.00 6215.00 100.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 3.30 1500.00 685.97 561.00 CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 0.65 512.29 385.00 385.00 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 1.00 950.00 2829.74 2100.00 ER1151-033 PR SH 115-MP 34.7 01/25/18 0.40 1650.00 1393.77 1350.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 1.20 2000.00 1063.03 1020.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 2.25 801.00 913.64 819.64 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 1.00 1100.00 1354.95 1083.70 C0703-440 AVALANCHE CONTROL SYSTEM: EJM 02/01/18 0.50 5000.00 2800.28 1000.00 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 2.00 2000.00 1240.64 1300.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 2.20 2000.00 1071.72 1090.00 ER144A-002 SH 144 East and West of Goodr 03/08/18 20.00 800.00 639.26 450.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 0.10 2500.00 4992.79 8400.00 NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 1.00 2400.00 4391.67 2500.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 0.50 3000.00 2046.49 1892.97 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 1.60 498.62 384.00 384.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 0.24 2500.00 2167.00 2250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 50.19 1231.06 902.22 986.11 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 0.25 800.00 6791.20 9142.00 STAR400-347 Various intersections across 04/12/18 0.20 5000.00 8046.00 500.00 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 14.00 900.00 630.00 360.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 0.80 5000.00 2227.75 2472.01 STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 0.10 3000.00 15508.75 25000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 169 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00006 Seeding (Native) Acre =================================================== NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 0.33 750.00 1908.25 3000.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 1.70 700.00 908.89 890.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 0.06 10000.00 7000.00 7000.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 0.14 5000.00 3190.48 3571.43 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 0.90 2000.00 9050.00 5750.00 NHPP0761-230 I-76 AND COUNTY ROAD 22 AT FO 06/14/18 0.01 1000.00 34000.00 25000.00 ER055A-001 PR SH 55 FLOOD REPAIR 2015 06/28/18 9.00 900.00 1097.95 825.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 27.49 1118.50 1330.63 1024.96 FBR060A-022 SH 60 over the South Platte 07/12/18 22.00 500.00 497.42 325.00 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 0.30 2500.00 6081.67 6123.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 0.90 2000.00 2164.69 1250.00 SHE0701-245 I-70 MEDIAN CABLE RAIL INSTAL 07/12/18 0.33 2700.00 1200.00 1200.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 1.50 1000.00 2433.33 625.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 2.60 4000.00 1574.47 973.40 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 24.00 698.58 698.58 698.58 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 1.50 902.00 3524.31 2400.00 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 0.74 2500.00 6907.50 900.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 6.70 1300.00 1252.26 1400.00 STA052A-040 SH 52: Antelope Creek 08/23/18 0.40 2000.00 1925.83 2150.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 2.00 800.00 2044.91 2000.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 1.30 1500.00 2363.16 2500.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 5.05 730.00 1259.31 770.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 0.02 10000.00 15328.50 10000.00 STMR200-246 R2–2018 CRITICAL CULVERTS REP 09/20/18 0.48 3000.00 1225.00 1225.00 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 0.10 950.00 11873.75 20000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 69.92 926.65 952.13 846.32 BR1131-006 SH 113 AT MP 11.5 10/11/18 3.00 800.00 764.66 610.00 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 0.05 5000.00 12439.50 4448.00 SHER200-243 R2 WRONG WAY PREVENTION 10/18/18 0.10 10000.00 1925.00 3500.00 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 0.50 2000.00 3889.28 1057.08 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 19.60 990.00 952.22 851.65 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 2.82 900.00 911.52 550.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 0.50 1750.00 2550.00 1530.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 2.60 775.00 1221.82 1215.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 117.50 800.00 313.92 341.25 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 1.00 3000.00 839.46 778.92 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 1.00 1500.00 2755.67 800.00 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 15.00 1500.00 1134.41 1050.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 170 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00006 Seeding (Native) Acre =================================================== NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 0.50 3000.00 2216.67 1000.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 1.60 800.00 781.84 725.70 ER052A-039 SH 170 11/15/18 0.25 2500.00 7373.07 15372.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 4.70 1260.00 1285.71 1285.71 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 0.10 10000.00 8143.32 8623.26 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 0.10 4000.00 6760.00 10000.00 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 0.36 2100.00 1460.00 2370.00 C R500-198 R5 GUARDRAIL REPLACEMENT/UPGR 11/29/18 0.04 10000.00 10471.30 9642.60 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 1.61 1000.00 3305.29 3424.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 0.12 5000.00 4815.66 6000.00 STA050A-028 US 50C Overlay 4th to Baxter 12/06/18 0.05 1500.00 14716.65 10000.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 53.00 750.00 905.56 750.00 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 0.50 2000.00 1236.33 1100.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 0.60 2000.00 1895.22 1419.87 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 0.90 1500.00 1506.67 945.00 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 2.00 800.00 1252.86 2800.00 MPR200-252 REGION 2 - PUEBLO COUNTY HIGH 12/20/18 0.25 10000.00 2533.33 1100.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 24.00 637.50 637.50 637.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 254.35 893.85 764.17 656.90 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 401.95 957.02 887.26 756.13 =============== 212-00009 Seeding (Temporary) Acre =================================================== FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 0.20 5000.00 2465.32 2500.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 0.40 2000.00 1063.25 326.75 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 1.50 1100.00 955.72 960.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.10 1642.86 1115.96 986.05 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 20.00 423.21 423.21 423.21 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20.00 423.21 423.21 423.21 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 37.00 348.21 348.21 348.21 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 37.00 348.21 348.21 348.21 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 59.10 419.59 497.19 396.25 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 171 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00011 Seeding (Lawn) Acre =================================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 0.05 100.00 8110.20 8220.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 0.05 100.00 8110.20 8220.40 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 0.02 2000.00 17681.51 22500.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 0.45 12000.00 2932.50 2000.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 9.50 800.00 1982.14 670.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9.97 1307.92 2083.51 773.82 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.02 1301.90 2098.25 810.98 =============== 212-00012 Seeding (Furnished) Acre =================================================== ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 2.40 26.24 63.00 63.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.40 26.24 63.00 63.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.40 26.24 63.00 63.00 =============== 212-00022 Seeding (Riparian) Acre =================================================== STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 0.40 2500.00 3065.28 6300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 0.40 2500.00 3065.28 6300.00 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 2.64 1000.00 1251.67 730.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.64 1000.00 1251.67 730.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 0.35 8000.00 2708.33 1500.00 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 0.31 3500.00 5002.00 10374.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 2.00 1040.36 1040.36 1040.36 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.66 2242.75 2970.10 2188.59 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.70 1685.21 2204.98 1801.55 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 172 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00023 Seeding (Upland Forest) Acre =================================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 3.00 653.57 653.57 653.57 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 653.57 653.57 653.57 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 653.57 653.57 653.57 =============== 212-00024 Seeding (Upland Grassland) Acre =================================================== NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 32.00 642.86 642.86 642.86 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 32.00 642.86 642.86 642.86 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 32.00 642.86 642.86 642.86 =============== 212-00028 Seeding (Wetlands) Acre =================================================== NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 0.06 12000.00 18313.75 4755.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 0.10 5175.00 7288.80 4800.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 0.10 3000.00 10713.18 11500.00 ER144A-002 SH 144 East and West of Goodr 03/08/18 0.20 3000.00 3161.43 3750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 0.46 4646.74 6704.74 5794.13 NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 1.12 2000.00 1566.67 1000.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 0.05 5000.00 8223.13 1595.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.17 2128.21 2274.80 1025.43 FBR060A-022 SH 60 over the South Platte 07/12/18 0.28 5000.00 3389.39 2750.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 0.01 2100.00 57603.32 18750.00 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 0.10 7000.00 10573.98 12000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 0.39 5438.46 5130.59 5532.05 BR1131-006 SH 113 AT MP 11.5 10/11/18 0.25 2500.00 4944.32 7200.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 173 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00028 Seeding (Wetlands) Acre =================================================== STA086A-051 SH 86; WEST OF I-70 11/29/18 0.05 9000.00 9566.99 13500.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 0.30 4000.00 3313.44 3000.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 2.00 1178.57 1178.57 1178.57 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.60 1781.59 3594.03 2204.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.62 2463.34 4318.71 2544.31 =============== 212-00032 Soil Conditioning Acre =================================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 0.05 15000.00 14110.20 8220.40 STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 0.80 6000.00 7509.99 17000.00 STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 0.10 5000.00 15250.00 11000.00 SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 0.30 3000.00 3700.00 3800.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 0.50 6000.00 535.02 480.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 1.05 4000.00 4087.50 2350.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 5.10 2500.00 2173.96 1695.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 4.30 4000.00 2852.20 2500.00 MTCER100-296 MTCE R1 FY18 WEST SIGN REPLAC 01/11/18 0.10 9000.00 7735.00 100.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 3.30 3500.00 2903.11 2300.00 CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 0.65 7168.01 5410.00 5410.00 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 1.00 5000.00 5572.62 8400.00 ER1151-033 PR SH 115-MP 34.7 01/25/18 0.40 2880.00 3701.50 3800.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 1.20 3500.00 3391.62 2550.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 2.25 1790.00 2380.06 2235.38 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 1.00 3000.00 4412.84 5320.51 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 2.00 3000.00 4531.16 4000.00 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 2.20 3000.00 3264.70 2850.00 ER144A-002 SH 144 East and West of Goodr 03/08/18 20.00 1850.00 1946.19 1750.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 0.50 2000.00 4930.18 9450.00 NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 1.00 7000.00 5683.33 7000.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 0.50 3000.00 5992.96 5985.91 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 4.00 6757.59 5410.00 5410.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 0.24 2500.00 4129.50 4300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 52.54 3146.54 2571.96 3035.01 STM0242-081 US 24 ROCKFALL MITIGATION 04/12/18 0.25 2800.00 11814.46 16200.00 STAR400-347 Various intersections across 04/12/18 0.20 7500.00 11546.00 500.00 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 7.00 2700.00 1517.07 342.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 174 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00032 Soil Conditioning Acre =================================================== SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 14.00 3000.00 2525.00 2400.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 0.85 5000.00 2922.95 1008.59 STA001A-002 SIGNALIZATION OF SH1 & I-25 S 04/19/18 0.10 3000.00 23371.25 40000.00 NHPP0701-239 I-70 MP 67-78 IN GARFIELD COU 04/19/18 0.33 4000.00 6648.43 6000.00 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 1.70 2900.00 2442.22 2600.00 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 0.06 7000.00 15000.00 15000.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 0.14 5000.00 6827.38 5357.14 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 0.90 3000.00 7758.33 1375.00 NHPP0761-230 I-76 AND COUNTY ROAD 22 AT FO 06/14/18 0.01 1000.00 34000.00 25000.00 ER055A-001 PR SH 55 FLOOD REPAIR 2015 06/28/18 9.00 2250.00 5206.66 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 34.54 2836.71 4039.71 2230.42 FBR060A-022 SH 60 over the South Platte 07/12/18 11.00 2200.00 2428.90 2100.00 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 0.30 5000.00 8567.17 10740.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 0.90 1500.00 1445.83 625.00 SHE0701-245 I-70 MEDIAN CABLE RAIL INSTAL 07/12/18 0.33 4000.00 5500.00 5500.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 1.50 2500.00 4228.33 2395.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 2.60 4000.00 5357.80 973.40 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 24.00 2464.29 2464.29 2464.29 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 1.50 4500.00 6190.38 6080.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 6.70 4150.00 3645.94 4800.00 STA052A-040 SH 52: Antelope Creek 08/23/18 0.40 4000.00 3121.67 3600.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 1.00 3000.00 6760.23 4000.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 1.30 3035.00 3216.77 3100.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 5.05 2700.00 2820.45 3000.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 0.02 15000.00 27959.00 10000.00 STMR200-246 R2–2018 CRITICAL CULVERTS REP 09/20/18 0.48 3500.00 600.00 600.00 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 0.10 2000.00 14667.50 20000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 57.18 2808.30 3053.71 2839.35 BR1131-006 SH 113 AT MP 11.5 10/11/18 3.00 2500.00 2904.65 3100.00 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 0.05 10000.00 20371.00 13344.00 NHPP0401-023 US 40 ELK SPRINGS 10/25/18 0.50 4000.00 5781.76 5785.92 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 19.60 3100.00 3927.47 3872.42 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 2.84 2700.00 2132.92 2450.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 0.50 3000.00 7205.71 9840.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 2.60 2800.00 5281.05 5435.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 117.50 2175.00 2538.17 2572.50 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 1.00 5000.00 6803.15 6606.30 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 1.00 4000.00 4437.33 1000.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 175 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00032 Soil Conditioning Acre =================================================== ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 15.00 3250.00 3158.96 3000.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 0.50 5000.00 1476.67 800.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 1.60 2500.00 2995.00 2891.00 ER052A-039 SH 170 11/15/18 0.25 3000.00 6266.13 6360.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 4.70 1575.00 1607.14 1607.14 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 0.10 10000.00 16692.85 17821.40 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 0.10 1200.00 9700.00 10000.00 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 0.36 2100.00 3680.00 5860.00 C R500-198 R5 GUARDRAIL REPLACEMENT/UPGR 11/29/18 0.04 15000.00 16961.65 15623.30 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 1.92 3000.00 4695.92 7169.00 STA086A-051 SH 86; WEST OF I-70 11/29/18 0.17 5000.00 7165.10 5400.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 63.00 2500.00 3058.75 2200.00 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 0.50 8000.00 3792.63 3000.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 0.60 2500.00 4283.64 4614.55 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 0.90 1500.00 4197.67 3838.00 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 2.00 2500.00 3200.00 2800.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 63.00 3053.57 3053.57 3053.57 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 303.33 2591.18 3004.79 2796.66 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 447.59 2703.06 3033.91 2786.39 =============== 212-00040 Soil Preparation (Lawn) Acre =================================================== NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 0.45 5000.00 6209.17 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 0.45 5000.00 6209.17 3000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 0.45 5000.00 6209.17 3000.00 =============== 212-00048 Soil Preparation (Spec) Cubic Yard ============================================= IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 56.00 2000.00 99.11 53.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 56.00 2000.00 99.11 53.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 56.00 2000.00 99.11 53.00 =============== 212-00050 Sod Sq Foot ================================================ SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 192.00 5.00 4.67 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 192.00 5.00 4.67 4.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 176 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00050 Sod Sq Foot ================================================ NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 1,695.00 10.00 3.00 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,695.00 10.00 3.00 3.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 19,740.00 1.63 1.66 1.66 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 2,775.00 2.50 5.09 10.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 30,000.00 1.00 0.82 0.71 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 52,515.00 1.32 1.32 1.56 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 54,402.00 1.60 1.35 1.61 =============== 212-00100 Tree Retention and Protection LUMP SUM =============================================== FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 1.00 2500.00 3180.74 2700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 2500.00 3180.74 2700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2500.00 3180.74 2700.00 =============== 212-00700 Organic Fertilizer - (Pilot Prog ONLY) Pound ================================================== ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 12,097.00 1.25 0.33 0.30 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12,097.00 1.25 0.33 0.30 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 1,750.00 2.00 0.80 1.06 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,750.00 2.00 0.80 1.06 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13,847.00 1.34 0.37 0.40 =============== 212-00701 Compost (Mech App) - (Pilot Prog ONLY) Cubic Yard ============================================= FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 346.00 30.00 41.05 35.37 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 177 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00701 Compost (Mech App) - (Pilot Prog ONLY) Cubic Yard ============================================= FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 455.00 5.00 39.11 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 801.00 15.80 40.28 35.16 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 801.00 15.80 40.28 35.16 =============== 212-00702 Bio Soil Amd (Hyd App) -(Pilot Prog ONLY Pound ================================================== ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 94,604.00 0.70 0.78 0.85 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 94,604.00 0.70 0.78 0.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 94,604.00 0.70 0.78 0.85 =============== 212-00703 Humate - (Pilot Prog ONLY) Pound ================================================== ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 6,724.00 1.25 0.33 0.27 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6,724.00 1.25 0.33 0.27 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 1,062.00 20.00 1.10 1.12 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 1,400.00 2.00 0.63 0.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,462.00 9.76 0.91 0.99 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,186.00 3.53 0.48 0.46 =============== 212-00704 Mycorrhizae - (Pilot Program ONLY) Pound ================================================== ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 280.00 10.00 10.44 10.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 280.00 10.00 10.44 10.00 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 118.00 5.00 16.28 12.34 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 178 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00704 Mycorrhizae - (Pilot Program ONLY) Pound ================================================== FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 145.00 2.00 9.93 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 263.00 3.35 13.87 12.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 543.00 6.78 12.01 11.04 =============== 212-00705 Elemental Sulfur - (Pilot Program ONLY) Pound ================================================== FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 2,985.00 2.00 0.63 0.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,985.00 2.00 0.63 0.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,985.00 2.00 0.63 0.80 =============== 212-00706 Seed (Native) Drill - (Pilot Prog ONLY) Acre =================================================== FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 4.93 800.00 744.86 642.48 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 6.86 730.00 1083.18 957.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 11.79 759.27 883.67 825.48 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.79 759.27 883.67 825.48 =============== 212-00707 Seed (Native) Hyd - (Pilot Prog ONLY) Acre =================================================== ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 27.80 900.00 1086.84 523.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 27.80 900.00 1086.84 523.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 27.80 900.00 1086.84 523.00 =============== 212-00708 Seed (Native) Brdcst - (Pilot Prog ONLY) Acre =================================================== FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 0.56 800.00 1377.31 1289.24 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 0.14 730.00 1536.00 970.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 0.70 786.00 1394.94 1225.39 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 0.70 786.00 1394.94 1225.39 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 179 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-01200 Landscape Restoration LUMP SUM =============================================== STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 1.00 1000.00 4750.00 6000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1000.00 4750.00 6000.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 1.00 1500.00 9723.33 12500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1500.00 9723.33 12500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1250.00 8480.00 9250.00 =============== 213-00002 Mulching (Weed Free Hay) Acre =================================================== STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 0.80 2000.00 5037.50 15000.00 NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 1.00 1500.00 5150.00 1800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.80 1722.22 5091.93 7666.67 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 1.70 900.00 737.13 890.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.70 900.00 737.13 890.00 NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 0.30 2000.00 5137.50 3945.00 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 1.50 2300.00 2988.33 1740.00 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 1.50 2695.00 3141.44 3750.00 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 6.70 800.00 884.82 975.00 STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 1.00 700.00 2911.79 3500.00 BRR200-228 REPLACE M-22-Z ON SH 10 MP 69 09/06/18 1.30 5150.00 1041.66 850.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.30 1694.92 1397.32 1671.22 SHER200-243 R2 WRONG WAY PREVENTION 10/18/18 0.10 10000.00 1925.00 3500.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 19.40 605.00 1019.58 658.73 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 180 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00002 Mulching (Weed Free Hay) Acre =================================================== STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 0.10 1400.00 8610.00 7000.00 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 0.36 2100.00 6345.00 10690.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 53.00 600.00 784.61 700.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 0.60 2000.00 2166.71 2691.82 MPR200-252 REGION 2 - PUEBLO COUNTY HIGH 12/20/18 0.25 10000.00 2533.33 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 73.81 665.67 880.87 767.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 89.61 832.61 1073.32 1032.66 =============== 213-00003 Mulching (Weed Free) Acre =================================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 0.10 2000.00 5805.23 4610.46 STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 0.10 10000.00 6000.00 4000.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 4.00 900.00 687.40 500.00 STA0342-060 US 34D OVERLAY AND BRIDGE WOR STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 3.10 1750.00 836.69 500.00 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 2.25 1240.00 607.24 460.22 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 1.60 1000.00 1061.91 1200.00 ER144A-002 SH 144 East and West of Goodr 03/08/18 17.00 900.00 650.12 525.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 1.00 800.00 1142.37 525.00 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 0.24 2500.00 3617.50 3750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 29.39 1065.50 703.59 602.81 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 0.30 2000.00 2683.30 1875.00 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 0.74 2500.00 2925.00 750.00 STA052A-040 SH 52: Antelope Creek 08/23/18 0.40 3000.00 1698.33 1800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.44 2534.72 2347.81 1276.04 BR1131-006 SH 113 AT MP 11.5 10/11/18 3.00 700.00 801.65 666.00 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 0.05 4500.00 16850.00 5560.00 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 2.84 1800.00 1088.34 680.00 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 15.00 1100.00 783.20 800.00 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 0.10 10000.00 13692.38 14659.53 C R500-198 R5 GUARDRAIL REPLACEMENT/UPGR 11/29/18 0.04 10000.00 4384.05 4038.10 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 1.12 1500.00 2433.35 3591.00 SHER100-302 RAMP METERING - DENVER METRO 12/13/18 0.90 1500.00 2559.33 3928.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 23.05 1230.67 1054.25 1101.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 53.88 1175.43 845.36 834.18 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 181 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00004 Mulching (Weed Free Straw) Acre =================================================== ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 4.30 650.00 903.96 840.00 ER1151-033 PR SH 115-MP 34.7 01/25/18 0.40 692.50 1095.74 1170.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 1.10 900.00 1242.68 879.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 0.50 1500.00 1921.03 1842.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.30 763.81 983.09 947.29 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 4.93 800.00 713.76 622.27 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 14.00 300.00 692.50 445.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 0.85 5000.00 1556.19 1424.50 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 0.06 10000.00 7000.00 7000.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 0.14 3000.00 5107.14 6696.43 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 19.98 671.37 800.73 593.90 FBR060A-022 SH 60 over the South Platte 07/12/18 22.00 500.00 787.90 724.00 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 24.00 542.15 542.15 542.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 46.00 521.99 767.42 629.12 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 1.00 2500.00 1691.20 1382.40 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 1.00 800.00 2076.00 1800.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 1.20 900.00 729.00 737.50 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 0.50 3000.00 1165.62 1000.00 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 1.80 850.00 1307.14 1700.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 50.00 616.07 616.07 616.07 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 55.50 688.53 833.93 692.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 127.78 629.61 806.54 666.81 =============== 213-00005 Mulching (Decorative) Cubic Foot ============================================= FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 482.00 5.50 10.06 14.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 482.00 5.50 10.06 14.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 482.00 5.50 10.06 14.50 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 182 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00007 Mulching (Wood Strand) Acre =================================================== CC0341-098 PR US 34 BTC LARIMER COUNTY S 01/12/18 0.65 22818.46 10190.00 10190.00 C0703-440 AVALANCHE CONTROL SYSTEM: EJM 02/01/18 0.50 5000.00 36463.39 1600.00 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 0.50 12957.52 10185.00 10185.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.65 14430.76 26870.72 7585.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.65 14430.76 26870.72 7585.45 =============== 213-00008 Mulching (Wood Chip) Cubic Foot ============================================= NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 4,238.00 3.00 2.73 2.70 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 6.00 100.00 40.00 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4,244.00 3.14 2.75 2.75 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 900.00 5.00 8.55 9.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 34.00 6.00 95.92 13.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1,812.00 4.47 3.16 3.16 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 3,715.00 3.00 4.30 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6,461.00 3.71 5.97 4.51 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10,705.00 3.48 4.77 3.81 =============== 213-00011 Mulching (Hydraulic) Acre =================================================== NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 3.76 900.00 1683.33 1250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.76 900.00 1683.33 1250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.76 900.00 1683.33 1250.00 =============== 213-00012 Spray-on Mulch Blanket Acre =================================================== SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 0.30 5000.00 3833.33 4200.00 STR133A-046 SH 133 BOWIE RESURFACING 01/04/18 0.50 4000.00 6476.28 6300.00 NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 1.05 4000.00 4225.00 5200.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 183 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00012 Spray-on Mulch Blanket Acre =================================================== MTCER100-296 MTCE R1 FY18 WEST SIGN REPLAC 01/11/18 0.10 5000.00 4505.00 100.00 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 0.20 5560.00 5821.39 4000.00 FBR0701-242 I-70 G-03-Q CO OVERFLOW NEAR 01/25/18 1.40 5000.00 3741.55 3250.00 FBR0702-382 I-70 F-10-L EAGLE RIVER BR NE 02/01/18 1.40 5000.00 4237.98 4231.36 FBR0701-244 I-70 F-05-L CO RIVER BRIDGE N 02/15/18 3.70 2000.00 3299.16 2975.00 ER007A-026 PR SH-7 FLOOD (PH II),EP - JC 03/01/18 27.40 2500.00 2969.96 2580.00 STA007A-025 SH-7 NON FLOOD, SHO (PH II),E ER144A-002 SH 144 East and West of Goodr 03/08/18 3.00 3500.00 2838.26 2500.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 0.10 2500.00 6757.30 10500.00 ER0341-099 PR US 34 BIG THOMPSON CANYON 03/28/18 3.50 5904.69 4950.00 4950.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 42.65 3062.80 3124.40 3018.25 STAR400-347 Various intersections across 04/12/18 0.20 5000.00 17096.00 500.00 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 14.00 3500.00 3226.67 3000.00 ER055A-001 PR SH 55 FLOOD REPAIR 2015 06/28/18 9.00 2750.00 3350.41 2580.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 23.20 3221.98 3347.96 2815.52 FBR060A-022 SH 60 over the South Platte 07/12/18 4.00 2850.00 2953.63 2600.00 SHE0701-245 I-70 MEDIAN CABLE RAIL INSTAL 07/12/18 0.33 5000.00 6000.00 6000.00 SHE 0701-227 I-70 Wildlife Fencing mp 65-8 07/19/18 2.60 4000.00 5631.67 3895.00 FBR071A-018 SH 71 ARKANSAS RIVER FASTER B 09/20/18 5.05 1.70 3250.70 2650.00 STAR400-345 Region 4 at US 85 bus @ 26th 09/20/18 0.02 25000.00 25648.00 10000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.00 1996.55 3313.44 3007.46 BR1131-006 SH 113 AT MP 11.5 10/11/18 0.80 4000.00 4546.40 3100.00 STA3851-017 US 385 @ Cheyenne Wells 90 De 11/08/18 0.20 3075.00 6877.14 2280.00 NHPP0702-366 I-70 Avon to Vail 11/08/18 2.60 3800.00 5357.42 5880.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 117.50 3200.00 2759.33 2604.00 NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 0.50 4900.00 7016.67 6500.00 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 1.00 3500.00 3690.88 3304.00 ER052A-039 SH 170 11/15/18 0.21 6000.00 6718.97 4900.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 3.90 1785.00 1821.42 1821.42 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 0.92 4000.00 5040.42 8828.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 7.00 3200.00 3915.01 3100.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 0.19 4000.00 4859.36 4584.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 134.82 3194.68 3034.34 2741.24 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 212.67 3103.60 3145.27 2819.92 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 184 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00013 Spray-on Mulch Blanket Pound ================================================== STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 3,000.00 2.50 2.33 3.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,000.00 2.50 2.33 3.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,000.00 2.50 2.33 3.35 =============== 213-00061 Mulch Tackifier Pound ================================================== FSA145A-061 SH 145 Dolores Sidewalk Ramps 01/04/18 10.00 60.00 44.11 38.22 STR069A-032 SH69, MP 25.7 TO MP 50.1 01/04/18 160.00 5.00 14.43 20.00 STR0091-043 SH 9 SUMMIT BOULEVARD MP 96.1 01/04/18 200.00 6.00 7.55 6.00 ER0342-058 PR US 34D MP 13.75 TO MP 14.7 01/04/18 800.00 2.80 2.31 1.90 STA0342-060 US 34D OVERLAY AND BRIDGE WOR ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 427.00 4.00 3.06 2.50 STA0142-065 SH-14 RESURF FT COLLINS, LEMA 01/11/18 620.00 10.00 2.83 2.30 ER1151-033 PR SH 115-MP 34.7 01/25/18 6.00 6.00 6.03 6.00 ER1151-034 PR SH 115-MP 40.5 NH0242-086 PR US24 MONTESSORI WALL MP 29 BR0252-444 Ramp BMP I-25 and Rockrimmon 01/25/18 450.00 3.00 2.01 1.75 NHPP1602-153 US 160 SH 84 TO TREASURE FALL 02/15/18 160.00 7.00 4.35 4.00 ER144A-002 SH 144 East and West of Goodr 03/08/18 3,400.00 3.00 2.22 2.00 STA1381-008 SH 138 LODGEPOLE CREEK & HMA 03/08/18 100.00 2.50 4.98 7.75 NH0504-904 CRITICAL CULVERT REPAIR - SH5 03/08/18 10.00 15.00 186.67 5.00 NHPP1602-164 US 160 WOLF CREEK PASS RSA 03/15/18 50.00 5.00 8.52 7.03 NHPP0852-112 US85:HAMPDEN TO FLORIDA-RESUR 03/29/18 48.00 4.00 4.63 4.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6,441.00 4.08 2.72 2.87 FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 2,465.00 3.00 2.38 2.18 SHE025A-042 I-25 MEDIAN CABLERAIL PHS II 04/19/18 1,390.00 3.00 2.25 2.00 FBR0502-081 US 50, MP 190.4 Near Sargents 04/19/18 85.00 10.00 8.49 8.24 NH0242-071 US 24 & 31ST STREET and US24 05/03/18 188.00 2.50 2.91 2.50 NHPPC200-009 US 550/32_22_12_17 DURANGO SI 05/24/18 30.00 25.00 12.00 12.00 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 28.00 3.00 14.42 18.75 NHPP0702-342 I-70 GW CANYON VARIABLE SPEED 06/14/18 900.00 5.00 9.83 7.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,086.00 3.58 3.19 3.33 FBR060A-022 SH 60 over the South Platte 07/12/18 4,400.00 2.70 2.31 2.15 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 185 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00061 Mulch Tackifier Pound ================================================== NHPP5502-090 R5 SEC 3 & 7 CHAIN STATIONS 07/12/18 30.00 20.00 13.44 16.00 STR151A-010 R5 SH 151 MP 13.36 Priority C 07/12/18 60.00 5.00 6.17 6.25 NH0853-106 US 85 AND WCR 18 Intersection 07/19/18 300.00 3.00 3.94 3.40 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 4,800.00 2.11 2.11 2.11 NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 260.00 6.60 11.08 6.00 NHPP0703-448 I-70 MP 253.7 TO 256.2 AND MP 08/02/18 150.00 3.50 9.50 3.50 BR025A-028 BRIDGE I25A BUTTE CREEK N-17- 08/23/18 1,340.00 2.60 2.67 2.25 STA052A-040 SH 52: Antelope Creek 08/23/18 80.00 10.00 4.28 4.20 MTCER100-301 MTCE R1 FY18 FREEWAY SIGNING 09/27/18 20.00 3.00 40.50 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 11,440.00 2.66 2.65 2.36 BR1131-006 SH 113 AT MP 11.5 10/11/18 720.00 3.00 2.83 2.67 NHPPR100-280 SIGNAL CABINET UPGRADE PHASE 10/18/18 20.00 10.00 69.50 17.00 SHER200-243 R2 WRONG WAY PREVENTION 10/18/18 20.00 7.50 30.00 50.00 NH2854-139 US285, MP 171.3 TO MP 190.0 11/01/18 3,900.00 3.00 2.52 2.61 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 570.00 3.50 14.94 2.75 NHPP4912-007 US 491 MP 36.15 - MP 53.74 11/15/18 100.00 10.00 5.91 5.82 NHPP 0252-455 SMART 25 MANAGED MOTORWAYS DE 11/15/18 200.00 4.00 14.12 4.85 ITS0242-088 FIBER OPTIC ON US 24 (I25 TO 11/15/18 4,500.00 3.00 2.86 3.20 C060A-023 SH-60 AND WCR-40 INTERSECTION 11/15/18 240.00 4.00 3.20 2.83 STU1211-085 SH121 (WADSWORTH): YALE TO 4T 11/29/18 10.00 50.00 43.52 45.99 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 10.00 2.60 226.00 500.00 NHPP2854-138 US 285 DECK REHABILITATION (F 11/29/18 36.00 4.00 13.50 22.75 C R500-198 R5 GUARDRAIL REPLACEMENT/UPGR 11/29/18 8.00 15.00 55.18 50.35 ERR400-329 PR SH14 & US287 NW OF FT COLL 11/29/18 112.00 5.00 22.44 27.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 50,000.00 2.50 2.64 2.40 STR1591-001 SH 159 SAN LUIS TO FT GARLAND 12/13/18 100.00 10.00 4.29 3.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 120.00 10.00 5.44 4.91 ER0252-467 PR SOUTH DOUGLAS CREEK 12/13/18 180.00 2.50 3.61 6.00 MPR200-252 REGION 2 - PUEBLO COUNTY HIGH 12/20/18 50.00 25.00 19.33 25.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 17,400.00 2.14 2.14 2.14 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 78,296.00 2.55 2.95 2.58 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 101,263.00 2.71 2.89 2.61 =============== 213-00067 Rock Mulch (Weed Free) Sq Foot ================================================ SHE0212-010 SH 21, OMAHA INTERSECTION IMP 01/04/18 8,777.00 1.90 1.38 1.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8,777.00 1.90 1.38 1.25 STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 2,020.00 2.50 6.21 3.03 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,020.00 2.50 6.21 3.03 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 186 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00067 Rock Mulch (Weed Free) Sq Foot ================================================ NHPP0501-068 CITY OF DELTA: US 50 MP 69.14 07/05/18 171.00 15.00 10.00 10.00 C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 150.00 15.00 8.50 5.00 NHPPR100-287 R1 CURB RAMPS - PH 2 09/06/18 105.00 15.00 30.00 75.00 STM0252-469 R2 ADA RAMPS I-25 INT S NEV- 09/06/18 66.00 8.00 13.50 15.00 NHPP0501-069 US 50 S. DELTA PHASE 2 ADA RA 09/06/18 590.00 15.00 15.00 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,082.00 14.57 15.70 18.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,879.00 3.16 3.04 3.14 =============== 213-00070 Landscape Weed Barr Fabric Sq Yard ================================================ STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 295.00 5.00 3.15 2.96 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 295.00 5.00 3.15 2.96 C0853-109 GREELEY ADA CURB RAMPS PHASE 08/09/18 19.00 10.00 19.00 26.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 19.00 10.00 19.00 26.00 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 484.00 3.00 5.45 2.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 610.00 3.68 3.75 3.75 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 135.00 9.00 15.80 50.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 884.00 3.00 2.18 1.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,113.00 3.58 4.67 5.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,427.00 3.80 4.64 5.27 =============== 213-00150 Bonded Fiber Matrix Acre =================================================== NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 0.06 15000.00 6675.00 5200.00 STR R200-238 SH 101 MP 0.85, SH 101 MP 2.1 01/18/18 1.00 2800.00 4996.00 5900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.06 3490.57 5060.58 5860.38 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 187 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00150 Bonded Fiber Matrix Acre =================================================== FBR069A-034 REPLACEMENT OF STR M-16-P 04/12/18 9.75 3200.00 2883.80 2818.84 FBR096A-047 STRUCTURE K-17-F FASTER BRIDG 04/19/18 28.00 250.00 2302.89 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 37.75 1011.92 2541.37 2953.21 C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 34.00 2775.00 2775.00 2775.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 34.00 2775.00 2775.00 2775.00 NHPP0705-082 I-70 ARRIBA: EAST AND WEST 11/15/18 100.20 2600.00 2592.67 2604.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.60 3150.00 3214.29 3214.29 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 7.00 3000.00 3829.79 3100.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 28.00 2839.28 2839.28 2839.28 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 136.80 2675.88 2711.42 2684.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 209.61 2396.40 2674.36 2763.75 =============== 213-00460 Landscape Border (3/16x4 In) Lin Foot =============================================== NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 100.00 6.83 6.96 6.96 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 215.00 6.40 11.00 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 315.00 6.54 10.66 10.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 315.00 6.54 10.66 10.40 =============== 213-00462 Landscape Border (3/16x5-1/2 In) Lin Foot =============================================== FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 525.00 6.00 11.50 10.50 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 1,620.00 4.50 7.98 6.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,145.00 4.87 8.99 7.18 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,145.00 4.87 8.99 7.18 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 188 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00470 Landscape Border (1/4x5 In) Lin Foot =============================================== STA0661-016 SH 66 and US 85 (BUS) IN PLAT 06/07/18 240.00 10.00 6.29 5.63 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 240.00 10.00 6.29 5.63 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 240.00 10.00 6.29 5.63 =============== 213-00700 Landscape Boulder Each =================================================== FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 4.00 350.00 611.54 555.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 27.00 299.25 305.36 305.36 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 31.00 305.80 435.65 337.57 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 31.00 305.80 435.65 337.57 =============== 213-00705 Landscape Boulder (Special) Each =================================================== ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 401.00 200.00 396.06 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 401.00 200.00 396.06 250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 401.00 200.00 396.06 250.00 =============== 214-00000 Landscape Maintenance LUMP SUM =============================================== NHPP0402-092 US 40 RABBIT EARS WEST 01/04/18 1.00 20000.00 12375.00 7500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 20000.00 12375.00 7500.00 ER055A-001 PR SH 55 FLOOD REPAIR 2015 06/28/18 1.00 15000.00 26831.75 9500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 15000.00 26831.75 9500.00 FBR060A-022 SH 60 over the South Platte 07/12/18 1.00 14000.00 19494.12 12500.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 189 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 214-00000 Landscape Maintenance LUMP SUM =============================================== STR167A-002 SH 167 from MP 0 - 4.9 Near F 08/23/18 1.00 3000.00 17204.87 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 8500.00 18921.80 7750.00 FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 1.00 12500.00 18222.37 24000.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 1.00 15750.00 16071.43 16071.43 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 1.00 40000.00 88436.55 91000.00 FSA0142-063 SH 14: S-CURVE RECONSTRUCTION 12/13/18 1.00 6500.00 16149.18 26249.71 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 18687.50 37537.58 39330.29 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 15843.75 26064.99 23727.64 =============== 214-00003 Landscape Maintenance (2020) LUMP SUM =============================================== C0252-475 I-25 : MONUMENT TO CASTLE ROC 07/20/18 1.00 31607.14 31607.14 31607.14 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 31607.14 31607.14 31607.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 31607.14 31607.14 31607.14 =============== 214-00005 Landscape Maintenance (24 Month) LUMP SUM =============================================== NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 1.00 40000.00 40000.00 30000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 40000.00 40000.00 30000.00 NHPP0252-476 I-25 SOUTH GAP: CASTLE ROCK T 12/21/18 1.00 30000.00 30000.00 30000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 30000.00 30000.00 30000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 35000.00 37500.00 30000.00 =============== 214-00155 Plant (B and B) Each =================================================== FBR060A-022 SH 60 over the South Platte 07/12/18 45.00 40.00 516.35 485.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 45.00 40.00 516.35 485.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 45.00 40.00 516.35 485.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 190 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 214-00205 Deciduous Tree (5 Gal) Each =================================================== NHPPC470-041 DOUGLAS COUNTY BRIDGE SCOUR R 04/12/18 21.00 47.00 83.33 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 21.00 47.00 83.33 40.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21.00 47.00 83.33 40.00 =============== 214-00210 Deciduous Tree (1 In C) Each =================================================== ER0252-466 PR MONUMENT CREEK BRANCH 01/11/18 20.00 200.00 384.90 380.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 200.00 384.90 380.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 200.00 384.90 380.00 =============== 214-00220 Deciduous Tree (2 In C) Each =================================================== NHPP0402-090 US 40 CRAIG EAST BPM 11/15/18 4.00 1000.00 660.33 500.00 NHPP0702-344 I-70G EDWARDS INT UPGRADE PHA 11/27/18 13.00 299.25 305.36 305.36 STRM331-007 I25C/SH160 PED/BIKE IMPROV ( 11/29/18 3.00 530.00 903.20 750.00 IM 0253-268 I-25: 120TH (SH 128) TO E470 12/06/18 26.00 310.00 639.80 702.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 46.00 381.31 640.41 575.47 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 46.00 381.31 640.41 575.47 =============== 214-00222 Decid Tree (2 In Cal) (Furnish) Each =================================================== NHPPR100-243 CULVERT REPAIRS THOUGHOUT REG 08/02/18 1.00 500.00 979.93 600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 500.00 979.93 600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 500.00 979.93 600.00 =============== 214-00225 Deciduous Tree (2.5 In C) Each =================================================== FSA052A-047 SH52 WCR 13 INTERSECTION 11/01/18 1.00 525.00 998.88 700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 525.00 998.88 700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 525.00 998.88 700.00 COLORADO DEPARTMENT OF TRANSPORTATION 10:52 Thursday, February 28, 2019 191 ITEM UNIT COSTS BY PROJECTS -- 2018 COST DATA ----------------------------------------------------------------------------------------------------------------------