Colorado Department of Transportation 13:09 Monday, January 22, 2018 1 2017 Cost Data PROJECTS BID FROM 01/01/17 THROUGH 12/31/17 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20170105 Casper Electric, Inc. 2 $3,060,140.82 65.71 NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 3 M 20170112 OLDCASTLE SW GROUP, INC. 4 $1,192,574.70 86.02 NHPP1602-145 US 160 S. Fork to Monte Vista 5 P 20170119 BRANNAN SAND AND GRAVEL, LLC 3 $5,232,750.15 94.53 NHPP R600-440 US40 (COLFAX BLVD) COLORADO BL 1 R 20170119 COULSON EXCAVATING COMPANY 4 $5,571,866.50 103.44 STA060A-019 SH 60 Resurfacing US 287 to Mi 4 U 20170119 MAIN ELECTRIC LTD 2 $4,442,658.57 98.65 NHPP1602-155 US 160 Wolf Creek Fiber Optic 5 M 20170119 A and S CONSTRUCTION CO. 2 $4,447,000.00 92.65 NH1604-013 US 160C Overlay, Jct. SH 389 E 2 P 20170119 ACME CONCRETE PAVING, INC. 3 $4,900,000.00 75.24 NHPP5502-093 US 160/550 PCCP DIAMOND GRINDI 5 M 20170126 FLATIRON CONSTRUCTORS, INC. 6 $5,671,562.95 84.65 STM0243-089 Midpoint: Station 1019+50 Cent 2 R STM0243-089 Midpoint: Station 1019+50 Cent 2 R 20170126 CC ENTRPRS TRAFFIC CONTROL SPECIALISTS 4 $227,668.00 65.70 MTCER100-274 MTCE R1 FY 17 SH 119 Signing 1 M 20170209 Myers and Sons Construction, LP 7 $1,499,000.00 63.66 NHPP145A-063 SH 145 Wall Failure MP 76.05 5 M 20170209 APC SOUTHERN CONSTRUCTION COMPANY, LLC 3 $6,945,725.04 91.60 STR0092-023 SH 9 NORTH MP 101.6 TO 107, US 3 M 20170209 HABITAT CONSTRUCTION, LLC 7 $483,898.96 120.97 IM025A-039 I-25 Critical Culvert at MP 12 2 P 20170209 ALL COWBOY EROSION CONTROL, LLC 6 $169,515.65 80.51 STA0931-032 SH 93 Erosion Correction 4 M 20170216 ESCO CONSTRUCTION CO. 3 $2,067,578.68 92.28 NHPPR100-249 Region 1 FY 17 US 040A Wall Re 1 M 20170216 INNOVATIVE MARKING SYSTEMS, INC. 4 $1,736,040.00 98.11 MTCER500-191 R5 FY17 Striping 5 M 20170302 OLDCASTLE SW GROUP, INC. 3 $6,947,000.00 95.94 NHPP4912-006 US 491 Surface Treatment MP 27 5 R 20170302 ROCK and CO. 5 $1,999,484.00 83.61 NHPP5502-087 US 550 Cribwell Repair MM 68.7 5 M Colorado Department of Transportation 13:09 Monday, January 22, 2018 2 2017 Cost Data PROJECTS BID FROM 01/01/17 THROUGH 12/31/17 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20170302 FLATIRON CONSTRUCTORS, INC. 5 $6,996,496.46 94.85 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRING 3 P 20170302 SIMON CONTRACTORS 5 $10,582,629.50 86.54 STA0853-101 US 85 FROM EATON (MP 275.5) TO 4 P 20170302 STURGEON ELECTRIC COMPANY, INC 3 $4,311,059.00 108.11 NHPP 0701-230 Midpoint WB Bore 3 M 20170302 Myers and Sons Construction, LP 4 $1,736,068.00 64.30 BR0252-449 I-25 Woodmen NB 2 R 20170302 TRICON 2, LLC 7 $4,860,000.00 103.40 SHE160A-031 SH 160 Passing Lanes 2 M 20170302 STURGEON ELECTRIC COMPANY, INC 5 $1,257,319.00 84.72 MTCER300-233 MTCE R3 FY17/18 Signal Replace 3 M 20170309 ASPHALT SPECIALTIES CO., INC. 4 $4,181,604.00 77.19 STA2873-180 US 287 (Federal) Resurfacing-1 1 R 20170309 A and S CONSTRUCTION CO. 3 $8,931,917.00 92.16 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN G 3 M 20170309 ASPHALT SPECIALTIES CO., INC. 3 $787,779.00 128.07 STA2873-183 US 287 Repairs at LCR 17 4 R 20170309 KOLBE STRIPING INC. 3 $1,802,361.28 82.67 MTCER300-239 070A MP 0-75,131-173; 040A, 00 3 M 20170317 KIEWIT INFRASTRUCTURE CO. 1 $11,636,336.92 100.00 ER0341-089 PR US 34 Big Thompson Canyon P 4 M 20170323 APC CONSTRUCTION CO., LLC 3 $4,358,821.17 108.61 STA0362-035 US 36: Strasburg to Byers 1 R 20170323 SIMON CONTRACTORS 5 $4,673,587.40 108.47 STA0243-087 US 24 El Paso-Elbert CL Paving 4 P 20170323 EWING TRUCKING & CONSTRUCTION 5 $482,898.75 97.52 STE 0702-357 I-70 West Vail Pass Basin 3 M 20170323 HAMILTON CONSTRUCTION CO. 5 $758,895.50 64.83 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 1 M 20170323 ROADSAFE TRAFFIC SYSTEMS, INC 3 $892,264.00 80.36 MTCER300-240 MTCE R3 FY 17/18 REGION WIDE S 3 M 20170323 ROADSAFE TRAFFIC SYSTEMS, INC 3 $123,245.85 75.22 MTCE2873-191 R4 FY 17 Stencils #1 4 U Colorado Department of Transportation 13:09 Monday, January 22, 2018 3 2017 Cost Data PROJECTS BID FROM 01/01/17 THROUGH 12/31/17 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20170330 W.L. CONTRACTORS, INC. 3 $1,078,435.90 83.71 SHER100-246 FY17 R1 Traffic Signal Replace 1 U 20170330 MARTIN MARIETTA MATERIALS 4 $10,400,280.57 115.56 STA067A-039 SH 67 Divide to Cripple Creek 2 M 20170330 Mark Construction, Inc. 4 $506,600.00 101.75 MTCER300-238 MTCE R3 FY 17/18 REGION WIDE S 3 M 20170330 ROADSAFE TRAFFIC SYSTEMS, INC 2 $1,745,197.93 101.37 SW01-932 I-70 MP 146 TO 259 1 M 20170406 BRANNAN SAND AND GRAVEL, LLC 2 $3,512,564.85 127.36 STA095A-017 SH 95 Sheridan Resurfacing 25t 1 U 20170406 APC CONSTRUCTION CO., LLC 1 $5,286,017.40 129.61 STA095A-018 SH 95 Sheridan Resurfacing: Ha 1 R 20170406 SIMON CONTRACTORS 2 $7,860,100.56 92.97 STA006A-057 SH 6 EAST OF STERLING 4 P 20170406 APC SOUTHERN CONSTRUCTION COMPANY, LLC 3 $7,330,067.22 86.24 STA 0503-089 US 50 - Royal Gorge West_SH9 J 2 M 20170413 APC CONSTRUCTION CO., LLC 3 $2,928,620.50 103.69 STA0404-055 SH 40 Colfax Resurfacing I-70 1 U 20170413 HAMILTON CONSTRUCTION CO. 8 $2,996,540.15 84.85 NHPP0703-433 EJMT S Bore Barrier, Handrail, 1 M 20170420 LAWRENCE CONSTRUCTION CO. 12 $10,200,000.00 75.56 STA0503-085 US 50 BNSF Railroad to Purcell 2 R 20170420 CASTLE ROCK CONST. CO. OF COLO, LLC 5 $9,113,519.94 93.95 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUEB 2 R 20170427 TEZAK HEAVY EQUIPMENT CO., INC. 3 $337,348.73 91.80 STRR500-169 R5 US 84 MP 14.67 Priority Cul 5 R 20170427 ABCO CONTRACTING, INC. 4 $4,174,637.50 89.38 NHPP0704-240 Package C (I-70 and I-25) Brid 1 U 20170427 OLDCASTLE SW GROUP, INC. 1 $5,669,488.30 89.26 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 3 U 20170427 TECHNOLOGY CONSTRUCTORS, INC. 3 $3,608,729.00 102.39 STAR500-190 R5 Signal Replacement Chaffee 5 U 20170504 AMERICAN WEST CONSTRUCTION, LLC 4 $1,149,975.00 95.50 BR0361-117 US 36 Culvert Repair MP 11.95 4 M Colorado Department of Transportation 13:09 Monday, January 22, 2018 4 2017 Cost Data PROJECTS BID FROM 01/01/17 THROUGH 12/31/17 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20170504 HAMON INFRASTRUCTURE, INC. 3 $8,980,000.00 107.01 NHPPC120-026 US 85: I-76 to 168th 1 R 20170504 PAONIA, INC 2 $1,280,180.50 97.57 STAR400-348 Region 4 Controller and Cabine 4 U 20170511 INTERSTATE SEALANT & CONCRETE, INC. 2 $1,398,949.50 100.76 STAR100-255 R1 FY18 CRACK SEAL 1 U 20170518 DILLIE AND KUHN, INC. 3 $148,001.35 75.47 AQC088A-035 Traffic Signal/Fiber Optic Ins 00 U 20170518 PAONIA, INC 2 $528,333.00 98.94 STM0211-026 SH21 AND MESA RIDGE PKWY SIGNA 2 U 20170601 SEMA CONSTRUCTION, INC. 4 $4,665,993.90 92.96 STA0703-437 I-70: 32ND TO 44TH 1 R 20170601 INNOVATIVE MARKING SYSTEMS, INC. 3 $2,515,106.00 76.22 MPR200-235 FY 2018 PAVEMENT MARKING PROJE 2 R 20170601 T-P ENTERPRISES INC. 2 $501,307.23 111.40 STMR200-240 REGION WIDE EROSION CONTROL 2 R 20170608 TLM CONSTRUCTORS, INC. 4 $775,026.00 132.48 STR050A-031 Storm Sewer on US 50C at James 2 R 20170615 KIRKLAND CONSTRUCTION, LLLP 5 $495,861.00 75.54 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 5 M 20170615 MCATEE CONSTRUCTION CO. 3 $1,305,182.30 89.48 STA0061-091 SH 6 CHIPSEAL NEAR FLEMING 4 P 20170615 KIRKLAND CONSTRUCTION, LLLP 4 $1,132,110.00 107.56 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 3 M 20170615 OLDCASTLE SW GROUP, INC. 1 $651,475.00 94.65 MTCE141A-048 SH 141A WHITEWATER IN MESA COU 3 R 20170622 AMERICAN CIVIL CONSTRUCTORS, LLC dba A 6 $7,680,036.00 92.38 ER0361-115 US 36 Bridges 4 R 20170622 INTERFACE COMMUNICATIONS COMPANY 5 $1,039,500.00 97.02 STA0072-019 SH 7 FROM US 287 TO 75TH STREE 4 R 20170622 OLDCASTLE SW GROUP, INC. 1 $1,452,622.00 95.47 MTCE142A-002 SH 142 CHIPSEAL 5 P 20170622 PAONIA, INC 2 $1,799,255.80 89.73 MTCE0253-259 I25 FROM MP 229.29 TO MP 244.5 4 R Colorado Department of Transportation 13:09 Monday, January 22, 2018 5 2017 Cost Data PROJECTS BID FROM 01/01/17 THROUGH 12/31/17 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20170622 KOLBE STRIPING INC. 3 $191,060.00 104.66 MTCER300-243 R3 FY18 REGION WIDE ROUNDABOUT 3 M 20170628 KIEWIT INFRASTRUCTURE CO. 1 $1,340,450.75 100.00 ER0341-093 PR US 34 BIG THOMPSON CANYON P 4 M 20170706 SEMA CONSTRUCTION, INC. 5 $3,510,879.70 75.60 NHPP2853-003 US 285 MP 143.1- 148.0 5 R 20170706 TLM CONSTRUCTORS, INC. 10 $383,432.00 96.81 MTCE0762-054 REGION 4 MTCE SECT1 I76 FORT M 4 P 20170713 CONNELL RESOURCES, INC. 2 $704,924.68 95.62 NHPP 2873-185 US 287: Ted's Place Intersecti 4 R 20170713 STURGEON ELECTRIC COMPANY, INC 2 $938,992.00 111.44 ITSSW01-834 ITS CAMERA PROJECT FY17 00 R 20170720 OLDCASTLE SW GROUP, INC. 3 $3,399,704.70 105.44 IM0701-212 I-70 EXIT 49 GRAND MESA 3 M 20170720 JALISCO INTERNATIONAL, INC. 3 $556,584.00 115.95 SHE0141-024 SH 14 Poudre Canyon Guardrail 4 M 20170720 JALISCO INTERNATIONAL, INC. 1 $3,058,740.74 89.64 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9. 1 R 20170720 STURGEON ELECTRIC COMPANY, INC 2 $2,392,395.00 91.66 CR100-283 REGION 1 TRAFFIC SIGNAL CONTRO 1 U 20170727 JHL CONSTRUCTORS, INC 13 $3,827,189.24 113.58 BR0362-037 US 36 at MP 140.1 and MP 140.9 4 P 20170727 AMERICAN WEST CONSTRUCTION, LLC 3 $693,270.00 107.71 ER0141-028 PR SH 14 REPAIR WEST OF RUSTIC 4 R 20170727 DILLIE AND KUHN, INC. 5 $1,884,034.20 75.07 ITS0761-227 ITS FIBER OPTICS ON I76 DENVER 00 P 20170803 DILLIE AND KUHN, INC. 6 $747,597.10 67.19 IM0762-052 FIBER OPTICS AND ITS DEVICES I 4 P 20170810 KOLBE STRIPING INC. 3 $1,563,795.20 96.07 MTCE0705-085 FY 18 I-70 EPOXY FROM MM 328 T 4 P 20170817 AMERICAN WEST CONSTRUCTION, LLC 2 $1,974,757.00 103.56 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 1 R 20170817 Dykhuis Drilling Corp. 3 $659,492.00 86.70 MTCE131A-039 SH 131 MP 0.053-68.721 IN EAGL 3 M Colorado Department of Transportation 13:09 Monday, January 22, 2018 6 2017 Cost Data PROJECTS BID FROM 01/01/17 THROUGH 12/31/17 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20170821 SEMA CONSTRUCTION, INC. 2 $248,491.00 8610.2 CR100-292 I25/ORCHARD EMERGENCY REPAIR 1 U 20170824 Myers and Sons Construction, LP 3 $1,120,000.00 112.11 ER012A-047 P-17-L Scour Critical SH 12 an 2 M 20170831 K.E.C.I. COLORADO, INC. 2 $685,567.00 146.30 NHPPR100-291 I-225 SB RESTRIPING I-25 TO YO 1 R 20170901 KIEWIT INFRASTRUCTURE CO. 1 $108,016,757.11 108.67 ER0341-090 PR US 34 BIG THOMPSON CANYON P 4 M 20170907 FLATIRON CONSTRUCTORS, INC. 11 $5,998,304.55 90.29 BRR400-354 Little-T Channel Work and SH 6 4 R ERR400-322 PR SH 60 and SH 257 Structures 4 R 20170907 INTERFACE COMMUNICATIONS COMPANY 3 $167,983.00 73.67 NHPP0821-108 SH 82 MP 45 OLVDS 3 M 20170914 WORK ZONE TRAFFIC CONTROL 3 $507,743.00 81.89 MPR200-244 REGION 2 FY18 SIGNING PROJECT 2 P 20170921 PAONIA, INC 3 $111,608.00 88.01 AQCR100-258 CDOT TSSIP 2016 SIG UPGRADE FE 00 U 20170921 JALISCO INTERNATIONAL, INC. 5 $1,910,511.65 81.13 SHE0831-119 SH83 LIGHTING: DAYTON TO MISSI 1 U 20170921 A-1 CHIPSEAL COMPANY 5 $233,723.14 48.80 MTCE R500-193 R5 FY 18 Regionwide MTCE Crack 5 R 20171005 SIMON CONTRACTORS 7 $599,401.00 85.63 STA094A-034 Critical Culvert Project on SH 2 R 20171005 Dykhuis Drilling Corp. 3 $548,510.00 109.70 MTCE0705-084 I-70 CRACK SEAL KANSAS STATE L 4 P 20171012 ROCK SOLID SOLUTIONS CORPORATION 2 $1,564,594.00 91.13 C0702-372 I-70 GWC Rockfall Fence Improv 3 M 20171019 PAONIA, INC 6 $1,854,526.73 115.18 ITSSW01-636 VMS AND LUS UPGRADE FY 17 00 M 20171026 NORAA CONCRETE CONSTRUCTION CORPORATION 2 $435,528.00 71.24 CR100-286 R1 CURB RAMPS-PH 1 1 U 20171109 Kilgore Companies, LLC dba Elam Construc 3 $5,095,866.05 128.57 SHE340A-018 SH 340 REDLANDS PARKWAY ROUNDA 3 R 20171116 ANDERSON DRILLING, INC 8 $1,327,746.00 77.02 C133A-042 SH 133 McClure Pass Slip 3 M Colorado Department of Transportation 13:09 Monday, January 22, 2018 7 2017 Cost Data PROJECTS BID FROM 01/01/17 THROUGH 12/31/17 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20171130 ZAK DIRT, INC. 6 $880,200.00 71.88 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORATI 1 M 20171130 BRANNAN SAND AND GRAVEL, LLC 5 $11,118,295.52 82.32 NHPP0252-447 I-25: MILE POST 194.04 TO MILE 1 R 20171130 APC SOUTHERN CONSTRUCTION COMPANY, LLC 3 $5,333,761.30 88.90 IM025A-037 I25 S. Trinidad Resurface and 2 R 20171130 OLDCASTLE SW GROUP, INC. 4 $1,251,868.12 89.33 STRR300-228 SH 13 R3 VARIOUS CHIP SEALS 3 M 20171130 MORTON ELECTRIC, INC. 5 $1,396,424.00 139.64 ITSSW01-831 ITS WEATHER STATION UPGRADES F 00 M 20171130 DILLIE AND KUHN, INC. 4 $242,899.50 80.97 ITSSW02-003 ITS FIBER INSTALLATIONS FOR HQ 00 P 20171207 APC SOUTHERN CONSTRUCTION COMPANY, LLC 5 $6,727,609.67 83.68 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 19 3 M 20171207 ABCO CONTRACTING, INC. 3 $542,288.00 144.79 MTCE092A-027 MTCE R3 FY18 SH 92 STR I-06-A 3 M 20171208 Myers and Sons Construction, LP 1 $1,084,421.91 98.34 NHPP0702-351 I-70: HLT GARAGE DOOR REPLACEM 3 M 20171211 KIEWIT INFRASTRUCTURE CO. 1 $870,457.55 93.16 CC0341-100 US 34 BIG THOMPSON CANYON MOOD 4 M 20171214 DRILL TECH DRILLING AND SHORING, INC. 3 $3,026,578.38 95.86 NHPP006A-059 US 6 CLEAR CREEK CANYON SH 93 1 M 20171221 TEZAK HEAVY EQUIPMENT CO., INC. 7 $3,068,335.40 94.05 BR3852-018 POA SCOUR US 385 4 P ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 4 P 20171221 TONY J. BELTRAMO AND SONS, INC. 6 $1,762,738.75 80.12 STA050A-027 US 50C Storm Sewer 21st LANE 2 R 20171221 OLDCASTLE SW GROUP, INC. 4 $4,753,678.20 82.44 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 3 M 20171221 DIAMOND SURFACE, INC. 2 $584,574.62 116.94 FSA0361-122 I-70 at Limon, US 40, US 287, 4 P ======= ================ ====== TOTALS 446 $440,113,099.44 96.11 Colorado Department of Transportation 13:09 Monday, January 22, 2018 1 2017 Cost Data BRIDGE COST PER SQUARE FOOT (01/01/17 THROUGH 12/31/17) ------------------------------------------------------------------------------------------------------------------------------------ PROJECT NUMBER/ TERR/ TOTAL TOTAL COST PER DATE LET PROJECT LOCATION BRIDGE ID LENGTH WIDTH SQUARE FT COST SQUARE FOOT ------------------------------------------------------------------------------------------------------------------------------------ BRIDGE REPAIR 170309 NHPP 0502-075 M US50 MP 127.0 TO MP 139.1 IN G 0300 993.0000 30.0000 29790.0 $674,676 $22.65 0301 1503.0000 30.0000 45090.0 $667,588 $14.81 170427 NHPP 0701-238 U I-70B MP 4.20 TO MP 4.69, US6 H-02-J 150.0000 31.5000 4725.0 $224,954 $47.61 171130 NHPP0252-447 R I-25: MILE POST 194.04 TO MILE F-17-CO 214.0000 118.0000 25252.0 $176,405 $6.99 F-17-DE 168.0000 106.0000 17808.0 $151,214 $8.49 F-17-IV 249.0000 132.3000 32942.7 $153,074 $4.65 F-17-DK 181.0000 140.0000 25340.0 $300,887 $11.87 F-17-JU 160.0000 67.8000 10848.0 $177,420 $16.36 171207 MTCE092A-027 M MTCE R3 FY18 SH 92 STR I-06-A 0300 278.4890 34.0000 9468.6 $307,813 $32.51 WEIGHTED AVERAGE COST: NEW STRUCTURES 201264.3 $2,834,031 $14.08 CONCRETE SLAB AND GIRDER 170406 STA 0503-089 M US 50 - Royal Gorge West_SH9 J 0304 US 50 K-15-W 275.0000 40.0000 11000.0 $67,624 $6.15 170727 BR0362-037 P US 36 at MP 140.1 and MP 140.9 0300 150.0000 43.0000 6450.0 $715,844 $110.98 0301 68.0000 43.0000 2924.0 $477,404 $163.27 WEIGHTED AVERAGE COST: NEW STRUCTURES 20374.0 $1,260,871 $61.89 CONCRETE SLAB BRIDGE 170309 STA2873-180 R US 287 (Federal) Resurfacing-1 0300 29.0000 89.6000 2598.4 $35,812 $13.78 170907 ERR400-322 R PR SH 60 and SH 257 Structures 0300 0.0452 40.0000 1.8 $1,393,789 $770,901.00 0301 0.0393 40.0000 1.6 $1,293,392 $822,768.45 WEIGHTED AVERAGE COST: NEW STRUCTURES 2601.8 $2,722,993 $1,046.59 FABRICATED STEEL GIRDER 170302 BR0252-449 R I-25 Woodmen NB 0304 324.0000 72.0000 23328.0 $166,646 $7.14 WEIGHTED AVERAGE COST: NEW STRUCTURES 23328.0 $166,646 $7.14 Colorado Department of Transportation 13:09 Monday, January 22, 2018 2 2017 Cost Data BRIDGE COST PER SQUARE FOOT (01/01/17 THROUGH 12/31/17) ------------------------------------------------------------------------------------------------------------------------------------ PROJECT NUMBER/ TERR/ TOTAL TOTAL COST PER DATE LET PROJECT LOCATION BRIDGE ID LENGTH WIDTH SQUARE FT COST SQUARE FOOT ------------------------------------------------------------------------------------------------------------------------------------ MISCELLANEOUS 170330 STA067A-039 M SH 67 Divide to Cripple Creek I-16-AA 24.0000 25.0000 600.0 $104,842 $174.74 WEIGHTED AVERAGE COST: NEW STRUCTURES 600.0 $104,842 $174.74 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 1 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 201-00000 Clear and Grub LUMP SUM =============================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 1.00 30000.00 58467.86 40000.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 1.00 15000.00 29235.54 15000.00 IM025A-039 I-25 Critical Culvert at MP 1 02/09/17 1.00 7500.00 33787.06 13159.44 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1.00 20000.00 37220.00 45000.00 SHE160A-031 SH 160 Passing Lanes 03/02/17 1.00 20000.00 57068.72 10000.00 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 1.00 20000.00 37580.00 16900.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 1.00 25000.00 38468.60 35000.00 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 1.00 20000.00 25918.80 16594.00 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 1.00 2000.00 13107.00 6100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9.00 18950.00 38304.72 21972.60 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 1.00 2000.00 10478.57 11300.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1.00 75000.00 51145.17 62214.25 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 1.00 10000.00 12757.27 14271.81 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 1.00 10000.00 10000.00 10000.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 1.00 80000.01 69057.34 65000.00 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 1.00 5000.00 39035.80 8000.00 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 1.00 10000.00 11005.00 5000.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 1.00 30000.00 43500.00 10000.00 ER0361-115 US 36 Bridges 06/22/17 1.00 85000.00 94333.33 25000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 9.00 34111.11 45862.12 23420.67 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 1.00 20000.00 83400.00 150000.00 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 1.00 6000.00 6750.00 1500.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 1.00 2000.00 2350.00 2350.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 1.00 40000.00 48528.55 25000.00 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 1.00 6500.00 14866.67 15000.00 IM0762-052 FIBER OPTICS AND ITS DEVICES 08/03/17 1.00 6000.00 5794.50 5000.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 1.00 27500.00 69333.33 20000.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1.00 28894.82 100000.00 100000.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 1.00 45000.00 71126.61 50000.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9.00 20210.54 49948.44 40983.33 STA094A-034 Critical Culvert Project on S 10/05/17 1.00 5000.00 6555.55 1600.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 2 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 201-00000 Clear and Grub LUMP SUM =============================================== SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 1.00 15000.00 2353200.00 24600.00 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 1.00 22500.00 31779.95 45000.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 1.00 10000.00 43169.89 8509.68 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 13125.00 390825.17 19927.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 31.00 22840.46 88071.65 27648.36 =============== 201-00001 Clear and Grub Acre =================================================== NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 0.50 5000.00 79323.33 37970.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 0.50 5000.00 79323.33 37970.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 1.30 7000.00 16177.50 22500.00 ER0341-093 PR US 34 BIG THOMPSON CANYON 06/28/17 0.50 57530.00 57530.00 57530.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.80 21036.11 19804.91 32230.56 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.30 17550.00 32204.58 33478.26 =============== 201-00005 Rem of Debris LUMP SUM =============================================== ER0361-115 US 36 Bridges 06/22/17 1.00 10000.00 6855.80 25000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 10000.00 6855.80 25000.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1.00 6608.05 4000.00 4000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 6608.05 4000.00 4000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 8304.03 6447.83 14500.00 =============== 202-00000 Rem Str and Obstructions LUMP SUM =============================================== IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 1.00 5000.00 15796.07 12500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 5000.00 15796.07 12500.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 3 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00000 Rem Str and Obstructions LUMP SUM =============================================== STA094A-034 Critical Culvert Project on S 10/05/17 1.00 22500.00 10824.20 7500.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 1.00 150.00 2336.83 710.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 11325.00 8277.99 4105.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 9216.67 10012.93 6903.50 =============== 202-00001 Rem Structure Each =================================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 8.00 5000.00 7817.63 7500.00 STM0243-089 Midpoint: Station 1019+50 Cen STA0362-035 US 36: Strasburg to Byers 03/23/17 1.00 2000.00 2139.61 1750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9.00 4666.67 7268.14 6350.00 ITSSW01-831 ITS WEATHER STATION UPGRADES 11/30/17 13.00 1500.00 3704.15 1750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 13.00 1500.00 3704.15 1750.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 22.00 2795.45 4855.03 3027.78 =============== 202-00002 Rem of Structure (Spec) Each =================================================== STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 1.00 150.00 6703.21 2200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 150.00 6703.21 2200.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1.00 18086.47 35000.00 35000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 18086.47 35000.00 35000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 9118.24 11419.34 18600.00 =============== 202-00003 Rem of Structure (Spec) LUMP SUM =============================================== NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 1.00 17790.00 5544.00 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 17790.00 5544.00 2500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 17790.00 5544.00 2500.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 4 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00008 Tree Trimming Hour =================================================== NHPP 0701-230 Midpoint WB Bore 03/02/17 8.00 250.00 239.46 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 250.00 239.46 250.00 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 12.00 385.00 385.00 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.00 385.00 385.00 350.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 331.00 312.23 310.00 =============== 202-00010 Rem Tree Each =================================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 6.00 400.00 1809.27 220.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 25.00 600.00 504.00 250.00 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 5.00 1000.00 1257.45 600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 36.00 622.22 774.45 300.30 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 8.00 500.00 1002.51 307.54 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 16.00 325.00 933.75 840.00 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 24.00 300.00 667.00 675.00 ER0361-115 US 36 Bridges 06/22/17 185.00 350.00 385.82 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 233.00 348.28 449.26 256.87 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 4.00 500.00 840.92 1200.00 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 10.00 350.00 741.67 825.00 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 4.00 330.00 1720.00 2300.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 219.00 437.97 485.00 485.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 3.00 400.00 933.45 800.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 240.00 433.06 606.36 545.27 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 30.00 350.00 1666943.33 300.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 5 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00010 Rem Tree Each =================================================== NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 250.00 500.00 237.19 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 280.00 483.93 94579.05 300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 789.00 434.71 44746.63 362.12 =============== 202-00013 Rem Erosion Mat Sq Yard ================================================ STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 120.00 6.00 0.78 0.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 120.00 6.00 0.78 0.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 120.00 6.00 0.78 0.50 =============== 202-00015 Rem Headwall Each =================================================== NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 3.00 900.00 565.00 565.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 4.00 750.00 1545.00 1100.00 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 1.00 3000.00 2501.80 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 1087.50 1621.83 886.88 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1.00 582.19 2200.00 2200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 582.19 2200.00 2200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 1031.35 1644.96 1032.78 =============== 202-00019 Rem Inlet Each =================================================== STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 2.00 800.00 1325.20 600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 800.00 1325.20 600.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 2.00 1000.00 1141.98 1041.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 10.00 800.01 1359.52 1700.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 6 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00019 Rem Inlet Each =================================================== ER0361-115 US 36 Bridges 06/22/17 3.00 1000.00 673.44 625.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 15.00 866.67 1115.49 1397.13 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 33.00 444.78 460.00 460.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 33.00 444.78 460.00 460.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 1.00 1000.00 923.67 720.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1000.00 923.67 720.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 51.00 593.68 945.07 746.22 =============== 202-00020 Rem CBC Each =================================================== ER0361-115 US 36 Bridges 06/22/17 1.00 30000.00 26960.69 15738.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 30000.00 26960.69 15738.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 30000.00 26960.69 15738.00 =============== 202-00021 Rem Manhole Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 2.00 800.00 1280.00 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 800.00 1280.00 1500.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 1.00 800.00 515.00 515.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 800.00 515.00 515.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 800.00 1210.45 1171.67 =============== 202-00023 Rem Emb Prot Ty 3 Each =================================================== STA006A-057 SH 6 EAST OF STERLING 04/06/17 5.00 583.00 888.79 950.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 583.00 888.79 950.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 7 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00023 Rem Emb Prot Ty 3 Each =================================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1.00 1139.94 2000.00 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1139.94 2000.00 2000.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 1.00 500.00 600.33 500.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 3.00 450.00 1185.58 456.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 462.50 1039.27 467.56 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 590.49 1015.62 862.03 =============== 202-00024 Rem Emb Prot Ty 5 Each =================================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1.00 1139.94 3100.00 3100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1139.94 3100.00 3100.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 4.00 550.00 1259.02 477.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 550.00 1259.02 477.05 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 667.99 1400.63 1001.64 =============== 202-00025 Rem Ditch Lining Lin Foot =============================================== NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 120.00 15.00 18.75 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 120.00 15.00 18.75 10.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 120.00 15.00 18.75 10.00 =============== 202-00026 Rem S and D Pave Sq Yard ================================================ STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 328.00 50.00 15.21 12.76 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 8 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00026 Rem S and D Pave Sq Yard ================================================ ER0361-115 US 36 Bridges 06/22/17 2.00 55.00 171.97 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 330.00 50.03 15.68 12.80 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 252.00 20.00 24.33 16.02 BR3852-018 POA SCOUR US 385 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 252.00 20.00 24.33 16.02 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 582.00 37.03 18.35 14.20 =============== 202-00027 Rem Riprap Sq Yard ================================================ STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 1,200.00 20.00 18.54 14.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 22.00 40.00 63.40 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,222.00 20.36 19.68 13.86 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 164.00 10.00 20.07 18.95 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 125.00 44.00 19.05 19.04 ER0361-115 US 36 Bridges 06/22/17 2,084.00 17.00 15.29 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,373.00 17.94 15.99 16.36 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 240.00 20.00 18.88 30.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 240.00 20.00 18.88 30.00 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 284.00 25.00 28.68 33.32 BR3852-018 POA SCOUR US 385 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 284.00 25.00 28.68 33.32 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,119.00 19.26 18.05 18.22 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 9 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00028 Rem of Eros Cntrl BMPS (Spec) LUMP SUM =============================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1.00 75752.04 100000.00 100000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 75752.04 100000.00 100000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 75752.04 100000.00 100000.00 =============== 202-00031 Rem of Fire Hydrant Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 2.00 1150.00 1190.00 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1150.00 1190.00 1500.00 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 3.00 2000.00 5330.00 6000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 2000.00 5330.00 6000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 1660.00 3151.05 4200.00 =============== 202-00032 Rem Valve Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 5.00 750.00 820.00 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 750.00 820.00 300.00 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 3.00 1500.00 4636.67 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 1500.00 4636.67 3000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 1031.25 1830.29 1312.50 =============== 202-00033 Rem Pipe Each =================================================== SHE160A-031 SH 160 Passing Lanes 03/02/17 1.00 500.00 1384.77 500.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 7.00 1500.00 1764.80 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 1375.00 1694.10 1112.50 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 10 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00033 Rem Pipe Each =================================================== ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 2.00 500.00 1349.13 1030.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 500.00 1349.13 1030.00 STA094A-034 Critical Culvert Project on S 10/05/17 1.00 3000.00 2086.37 2000.00 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 1.00 3000.00 6824.85 6073.92 BR3852-018 POA SCOUR US 385 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 3000.00 4455.61 4036.96 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 1500.00 2087.41 1586.16 =============== 202-00035 Rem Pipe Lin Foot =============================================== STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 63.00 30.00 61.50 50.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 484.00 45.00 36.26 20.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 100.00 100.00 57.77 55.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 288.00 40.00 35.60 13.00 SHE160A-031 SH 160 Passing Lanes 03/02/17 6.00 25.00 137.41 62.50 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 6.00 100.00 212.20 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 947.00 48.51 43.61 25.83 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 145.00 25.00 28.81 20.82 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 299.00 75.00 74.67 24.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 15.00 60.00 73.11 34.32 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 1,622.00 30.00 9.50 9.50 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 48.00 35.00 34.90 25.00 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 104.00 170.00 56.80 15.00 ER0361-115 US 36 Bridges 06/22/17 316.00 40.00 29.86 33.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,549.00 42.22 33.09 15.42 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 3,800.00 17.81 30.00 30.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 11 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00035 Rem Pipe Lin Foot =============================================== ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 1,062.00 22.00 15.94 17.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,862.00 18.73 19.39 27.16 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 137.00 25.00 17.33 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 137.00 25.00 17.33 18.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,495.00 29.20 26.62 23.27 =============== 202-00037 Rem of End Section Each =================================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 8.00 300.00 269.18 150.00 STM0243-089 Midpoint: Station 1019+50 Cen IM025A-039 I-25 Critical Culvert at MP 1 02/09/17 1.00 350.00 692.17 505.16 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 13.00 300.00 526.00 300.00 SHE160A-031 SH 160 Passing Lanes 03/02/17 9.00 475.00 416.46 100.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 5.00 300.00 359.40 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 36.00 345.14 434.22 204.07 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 8.00 225.00 423.28 226.62 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 2.00 1000.00 315.00 150.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 7.00 400.00 690.00 690.00 ER0361-115 US 36 Bridges 06/22/17 2.00 450.00 366.44 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 19.00 394.74 427.70 402.26 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 6.00 178.51 675.00 675.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 178.51 675.00 675.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 2.00 300.00 310.33 480.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 12 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00037 Rem of End Section Each =================================================== ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 2.00 450.00 698.15 564.04 BR3852-018 POA SCOUR US 385 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 375.00 581.80 522.02 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 65.00 346.09 444.71 332.97 =============== 202-00040 Rem Elec Conduit Lin Foot =============================================== SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 318.00 10.00 4.23 8.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 318.00 10.00 4.23 8.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 318.00 10.00 4.23 8.20 =============== 202-00047 Rem Elec Equipment LUMP SUM =============================================== NHPP 0701-230 Midpoint WB Bore 03/02/17 1.00 5000.00 3589.65 3650.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 5000.00 3589.65 3650.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5000.00 3589.65 3650.00 =============== 202-00055 Rem of FO Cable Lin Foot =============================================== NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 500.00 1.50 1.05 1.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 500.00 1.50 1.05 1.05 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 500.00 1.50 1.05 1.05 =============== 202-00080 Rem Guard Post Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 2.00 160.00 759.00 95.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 160.00 759.00 95.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 160.00 759.00 95.00 =============== 202-00090 Rem Delineator Each =================================================== NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 100.00 50.00 29.21 8.41 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 13 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00090 Rem Delineator Each =================================================== NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 450.00 7.00 5.63 6.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 340.00 7.00 4.90 5.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 158.00 7.00 11.51 25.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 8.00 30.00 19.67 10.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 19.00 15.00 12.95 20.00 SHE160A-031 SH 160 Passing Lanes 03/02/17 99.00 5.00 5.98 5.56 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 2.00 20.00 15.50 22.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 250.00 6.50 10.27 21.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 426.00 6.50 6.13 5.60 STA2873-183 US 287 Repairs at LCR 17 03/09/17 51.00 10.00 5.17 4.50 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 7.00 20.00 22.73 7.50 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 168.00 10.00 6.60 5.50 STA0362-035 US 36: Strasburg to Byers 03/23/17 10.00 10.00 15.93 11.68 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 5.00 15.00 36.50 60.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 1,126.00 5.00 5.51 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,219.00 7.84 7.04 7.73 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 1,651.00 5.00 2.55 1.56 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 53.00 5.00 11.30 3.30 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 114.00 6.50 5.75 9.88 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 30.00 6.00 5.25 5.25 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 4.00 25.00 77.75 20.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 10.00 10.01 82.99 80.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 300.00 14.00 39.43 6.50 ER0361-115 US 36 Bridges 06/22/17 18.00 10.00 13.87 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,180.00 6.43 10.05 3.26 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 10.00 10.00 20.95 20.00 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 38.00 8.00 10.50 12.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 14.00 10.00 30.67 75.00 NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 2.00 10.00 19.00 25.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 2,725.00 5.00 5.25 5.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,789.00 5.09 6.05 5.76 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 26.00 5.00 18.83 5.50 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 14 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00090 Rem Delineator Each =================================================== C133A-042 SH 133 McClure Pass Slip 11/16/17 16.00 12.00 74.13 30.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 30.00 13.00 94.80 100.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 340.00 7.50 5.67 5.10 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 380.00 6.50 5.60 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 792.00 7.24 13.63 9.64 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,980.00 6.59 8.57 6.19 =============== 202-00150 Rem Wall Each =================================================== NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 2.00 30000.00 69420.00 36100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 30000.00 69420.00 36100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 30000.00 69420.00 36100.00 =============== 202-00155 Rem Wall Lin Foot =============================================== STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 142.00 40.00 31.91 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 142.00 40.00 31.91 20.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 82.00 20.00 39.50 39.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 82.00 20.00 39.50 39.50 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 100.00 35.00 41.00 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 100.00 35.00 41.00 13.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 324.00 33.40 35.44 22.77 =============== 202-00165 Rem Wall LUMP SUM =============================================== NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 1.00 5000.00 17503.74 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 5000.00 17503.74 5000.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 15 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00165 Rem Wall LUMP SUM =============================================== ER0361-115 US 36 Bridges 06/22/17 1.00 16000.00 5996.95 6000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 16000.00 5996.95 6000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 10500.00 12192.92 5500.00 =============== 202-00170 Grinding And Texturing Conc Pvmt Sq Yard ================================================ NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 149,514.00 7.50 9.83 8.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 149,514.00 7.50 9.83 8.90 MTCE0762-054 REGION 4 MTCE SECT1 I76 FORT 07/06/17 10.00 100.00 472.78 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 100.00 472.78 150.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 280.00 20.00 43.00 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 280.00 20.00 43.00 25.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 149,804.00 7.53 9.99 8.94 =============== 202-00175 Rem Concrete LUMP SUM =============================================== NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 1.00 1000.00 1130.00 1130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 1000.00 1130.00 1130.00 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 1.00 5000.00 2111.32 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 5000.00 2111.32 1500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 3000.00 1971.13 1315.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 16 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00190 Rem of Conc Median Cover Matl Sq Yard ================================================ STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 280.00 15.00 1.24 1.07 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 133.00 9.00 21.80 10.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 137.00 16.00 24.67 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 550.00 13.80 13.40 7.94 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 1,315.00 10.00 8.50 8.50 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 840.00 15.00 17.50 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,155.00 11.95 13.55 7.14 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 10.00 20.00 60.50 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 20.00 60.50 13.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 483.00 12.00 9.05 7.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 483.00 12.00 9.05 7.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,198.00 12.30 12.85 7.37 =============== 202-00195 Rem of Median Cover Sq Yard ================================================ STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 5,297.00 9.00 4.48 5.75 STA0362-035 US 36: Strasburg to Byers 03/23/17 6.00 12.00 81.23 58.09 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,303.00 9.00 4.53 5.81 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 179.00 25.00 32.19 35.20 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 101.00 15.00 16.02 15.79 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 1,024.00 9.75 10.67 4.37 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 16.00 50.00 172.00 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,320.00 12.71 13.93 11.19 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,623.00 9.74 6.44 6.88 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 17 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00200 Rem Sidewalk Sq Yard ================================================ NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 227.60 35.00 31.82 38.50 NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 3,361.00 12.00 20.85 14.50 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 136.00 17.00 27.13 20.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 228.00 30.00 92.57 85.70 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 524.00 25.00 18.60 4.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 135.00 15.00 27.26 20.50 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 199.00 12.00 33.27 19.50 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 6.00 20.00 270.43 330.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 76.00 12.00 47.40 40.67 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 27.00 12.00 35.33 31.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,919.60 15.51 25.98 19.19 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 488.00 10.50 30.00 30.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 288.00 20.00 16.01 11.00 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 19.00 12.80 27.92 30.62 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 441.00 25.00 33.67 33.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 192.00 20.00 28.00 28.00 ER0361-115 US 36 Bridges 06/22/17 5.00 13.00 82.08 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,433.00 18.18 29.18 27.05 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 370.00 25.00 8.50 8.50 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 65.00 20.00 28.60 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 435.00 24.25 13.73 12.46 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 718.00 25.00 23.75 25.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 763.00 15.00 8.55 7.65 ITSSW02-003 ITS FIBER INSTALLATIONS FOR H 11/30/17 7.00 25.00 172.68 105.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,488.00 19.87 15.59 16.48 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,275.60 17.22 24.44 19.71 =============== 202-00201 Rem Curb Lin Foot =============================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 22.00 7.00 13.43 9.30 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 18 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00201 Rem Curb Lin Foot =============================================== STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 31.00 15.00 18.50 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 53.00 11.68 16.74 21.41 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 53.00 10.00 21.60 21.60 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 763.00 15.00 12.69 10.20 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 1,963.00 3.00 4.67 3.17 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,779.00 6.43 6.43 5.45 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 78.00 13.00 12.00 12.00 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 400.00 10.00 15.00 12.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1,188.00 4.29 17.00 17.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,666.00 6.07 15.87 15.57 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,498.00 6.36 8.92 9.39 =============== 202-00202 Rem Gutter Lin Foot =============================================== STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 300.00 15.00 16.50 10.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 278.00 13.00 13.26 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 578.00 14.04 14.76 10.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 25.00 14.00 42.26 67.00 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 80.00 25.00 28.67 22.00 ER0361-115 US 36 Bridges 06/22/17 41.00 12.00 28.05 17.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 146.00 19.47 29.65 28.30 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 75.00 25.00 12.50 12.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 75.00 25.00 12.50 12.50 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 19 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00202 Rem Gutter Lin Foot =============================================== SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 85.00 20.00 7.50 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 85.00 20.00 7.50 6.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 884.00 16.44 16.49 12.85 =============== 202-00203 Rem Curb and Gutter Lin Foot =============================================== NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 416.00 10.00 14.18 13.50 NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 4,940.00 6.00 10.57 7.20 NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 180.00 15.00 23.00 25.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 1,182.00 15.00 15.00 15.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 2,966.00 6.00 19.44 16.07 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 869.00 6.00 10.70 4.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 14,183.00 7.00 5.22 4.25 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 688.00 6.00 13.60 10.50 STA0362-035 US 36: Strasburg to Byers 03/23/17 175.00 7.00 29.71 29.05 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 432.00 7.00 11.42 9.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 26,031.00 7.10 8.34 7.34 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 1,360.00 8.00 15.00 15.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 2,360.00 12.00 10.94 10.20 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 237.00 8.00 15.06 17.90 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 398.00 5.00 7.56 7.37 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 1,239.00 7.00 5.97 2.36 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 640.00 20.00 19.33 12.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 2,065.00 6.00 5.50 5.50 STA0703-437 I-70: 32ND TO 44TH 06/01/17 60.00 12.00 36.95 50.00 ER0361-115 US 36 Bridges 06/22/17 41.00 8.00 15.68 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8,400.00 9.29 9.76 9.18 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 306.00 15.00 8.00 8.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 626.00 12.00 12.50 12.50 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 8.00 11.74 70.00 70.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 20 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00203 Rem Curb and Gutter Lin Foot =============================================== SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 25.00 12.00 25.35 12.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 965.00 12.95 12.00 11.54 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 1,086.00 12.00 10.50 12.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 2,006.00 6.00 4.35 3.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,092.00 8.11 5.98 6.68 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 38,488.00 7.81 8.46 7.80 =============== 202-00204 Rem C, G and Sidewalk Lin Foot =============================================== STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 552.00 11.00 23.94 20.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 16.00 40.00 66.40 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 568.00 11.82 25.42 19.66 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 568.00 11.82 25.42 19.66 =============== 202-00206 Rem Conc Curb Ramp Sq Yard ================================================ NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 133.30 18.00 32.57 38.50 NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 937.00 16.00 18.03 12.50 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 52.00 30.00 26.80 30.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 422.00 25.00 113.49 103.91 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 140.00 15.00 34.20 6.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 48.00 30.00 33.57 40.25 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 237.00 25.00 38.04 27.50 STA0362-035 US 36: Strasburg to Byers 03/23/17 24.00 30.00 74.03 40.67 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 65.00 21.00 27.17 23.50 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 1.80 20.00 791.37 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,060.10 19.94 43.22 37.69 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 294.00 25.00 63.30 63.30 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 361.00 20.00 62.68 81.00 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 291.00 27.00 47.16 29.90 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 21 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00206 Rem Conc Curb Ramp Sq Yard ================================================ NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 8.00 30.00 140.00 140.00 ER0361-115 US 36 Bridges 06/22/17 8.00 35.00 65.80 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 962.00 23.85 56.20 60.49 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 209.00 35.00 20.00 20.00 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 3.00 40.00 101.80 15.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 212.00 35.07 25.48 19.93 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 70.00 35.00 27.00 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 70.00 35.00 27.00 20.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,304.10 22.37 45.13 42.82 =============== 202-00207 Rem of Brick Pavers Sq Yard ================================================ STE 0702-357 I-70 West Vail Pass Basin 03/23/17 32.00 25.00 59.00 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 32.00 25.00 59.00 45.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 32.00 25.00 59.00 45.00 =============== 202-00210 Rem Conc Pavement Sq Yard ================================================ NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 1,382.00 15.00 20.98 14.50 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 79.00 20.00 28.80 40.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 18.00 25.00 79.83 58.09 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 11.00 15.00 34.33 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,490.00 15.39 22.32 16.53 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 120.00 17.00 66.60 66.60 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 204.00 18.00 28.85 11.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 22 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00210 Rem Conc Pavement Sq Yard ================================================ STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 98.00 23.00 49.61 29.90 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 28.00 50.00 74.33 36.00 NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 17.00 20.00 155.75 133.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 96.00 20.00 11.75 11.75 STAR400-348 Region 4 Controller and Cabin 05/04/17 37.00 40.00 40.00 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 600.00 21.84 48.31 32.05 MTCE0762-054 REGION 4 MTCE SECT1 I76 FORT 07/06/17 2,350.00 20.00 50.32 30.00 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 35.00 40.00 48.50 57.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 61.00 20.00 30.00 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,446.00 20.29 50.26 30.39 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 6.00 50.00 49.92 80.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 56.00 12.00 65.60 26.79 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 62.00 15.68 64.08 31.94 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,598.00 18.84 45.96 26.13 =============== 202-00212 Rem Conc Pavement (Spec) Sq Yard ================================================ STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 39,824.00 8.00 7.37 7.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 39,824.00 8.00 7.37 7.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 39,824.00 8.00 7.37 7.40 =============== 202-00215 Rem Conc Pvmt (Planing) Sq Yard ================================================ STA2873-183 US 287 Repairs at LCR 17 03/09/17 845.00 7.00 17.50 10.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 845.00 7.00 17.50 10.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 845.00 7.00 17.50 10.50 =============== 202-00217 Rem Conc Pvmt (Planing) (Spec) Sq Yard ================================================ BR0252-449 I-25 Woodmen NB 03/02/17 3,294.00 40.00 31.50 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,294.00 40.00 31.50 20.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 23 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00217 Rem Conc Pvmt (Planing) (Spec) Sq Yard ================================================ NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 2,753.00 55.00 30.00 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,753.00 55.00 30.00 30.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,047.00 46.83 30.82 24.55 =============== 202-00220 Rem Asphalt Mat Sq Yard ================================================ NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 71.10 25.00 48.69 74.50 NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 60.00 5.00 64.58 39.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 11,349.00 4.00 4.29 4.50 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 4,666.00 12.00 10.08 10.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 1,489.00 40.00 19.10 9.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 12,565.00 5.50 9.00 10.00 SHE160A-031 SH 160 Passing Lanes 03/02/17 2,890.00 10.00 6.60 5.00 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 431.00 30.00 48.60 45.00 NHPP 0701-230 Midpoint WB Bore 03/02/17 9,850.00 10.00 4.02 4.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 367.00 6.00 19.76 23.00 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 5,163.00 4.50 9.51 5.50 STA0362-035 US 36: Strasburg to Byers 03/23/17 2,778.00 6.50 9.94 7.15 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 127.00 7.00 65.40 50.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 96.00 7.00 32.33 32.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 51,902.10 8.04 8.53 7.27 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 100.00 7.00 27.60 27.60 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 42.00 7.00 133.58 130.00 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 50.00 11.00 34.46 35.30 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 23,832.00 5.00 6.64 4.41 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 1,110.00 20.00 19.80 8.40 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 11,069.00 10.00 3.35 3.35 STAR400-348 Region 4 Controller and Cabin 05/04/17 12.00 65.00 42.50 45.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 155.00 10.00 29.00 35.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 8,379.00 7.00 11.84 20.00 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 920.00 7.50 10.96 10.00 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 31.00 50.00 69.40 75.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 561.00 10.00 63.75 50.00 ER0361-115 US 36 Bridges 06/22/17 10,940.00 7.50 5.32 2.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 57,201.00 7.18 7.24 7.07 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 24 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00220 Rem Asphalt Mat Sq Yard ================================================ NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 201.00 15.00 12.75 10.50 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 17.00 7.50 50.00 50.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 4,153.00 8.00 8.31 3.40 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 999.00 7.25 8.57 5.27 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 22,740.00 6.44 8.00 8.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 11,316.00 5.00 4.56 4.00 BRR400-354 Little-T Channel Work and SH SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 10,640.00 7.50 10.18 6.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 50,066.00 6.52 6.68 6.31 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 44.00 9.00 25.00 30.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 9,902.00 4.00 2.25 3.00 STRR300-228 SH 13 R3 VARIOUS CHIP SEALS 11/30/17 4,363.00 4.50 12.44 4.25 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 1,049.00 6.40 19.33 7.00 STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 3,700.00 8.00 7.05 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 19,058.00 5.03 6.94 4.93 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 178,227.10 7.02 7.40 6.68 =============== 202-00222 Removal of Detour Pavement Sq Yard ================================================ ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 5,546.00 10.83 20.00 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5,546.00 10.83 20.00 20.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,546.00 10.83 20.00 20.00 =============== 202-00226 Rem of Asph Mat (Special) Sq Yard ================================================ STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 75,070.00 6.00 5.53 4.70 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 35.00 20.00 245.60 185.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 75,105.00 6.01 5.62 4.78 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 1,852.00 13.00 10.66 4.37 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 25 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00226 Rem of Asph Mat (Special) Sq Yard ================================================ STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 47.00 73.00 74.07 35.70 NHPPC120-026 US 85: I-76 to 168th 05/04/17 15.00 18.00 644.09 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,914.00 14.51 17.18 16.86 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 77,019.00 6.22 5.80 5.08 =============== 202-00240 Rem Asphalt Mat (Planing) Sq Yard ================================================ NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 110,387.00 3.00 5.60 3.95 NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 4,543.00 12.00 17.35 17.69 NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 6,461.00 10.00 5.68 7.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 90,464.00 2.20 3.00 3.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 13,780.00 3.50 3.09 2.00 STM0243-089 Midpoint: Station 1019+50 Cen STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 309,270.00 3.50 2.39 1.53 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 146,866.00 1.50 1.77 1.20 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 79,176.00 2.50 2.32 1.79 SHE160A-031 SH 160 Passing Lanes 03/02/17 37,673.00 2.00 2.61 1.98 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 1,761.00 35.00 7.29 8.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 50,879.00 2.75 2.16 1.90 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 4,849.00 3.60 6.72 10.15 STA2873-183 US 287 Repairs at LCR 17 03/09/17 5,460.00 3.50 8.90 6.70 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 208,650.00 2.00 2.46 2.00 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 11,374.00 4.00 2.96 3.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 123,850.00 2.75 3.09 2.33 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 9,174.00 1.06 4.57 3.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,214,617.00 2.74 2.76 2.22 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 121,543.00 2.75 5.00 5.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 78,724.00 3.50 4.80 4.40 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 239,934.00 1.50 1.64 1.62 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 107,753.00 2.75 3.38 2.80 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 31,716.00 5.00 1.97 1.20 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 187,614.00 1.71 2.00 1.11 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 7,259.00 10.00 6.33 6.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 40,195.00 3.00 2.40 2.40 NHPPC120-026 US 85: I-76 to 168th 05/04/17 280,420.00 2.75 2.69 1.70 STA0703-437 I-70: 32ND TO 44TH 06/01/17 99,181.00 3.50 2.45 1.30 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 270.00 35.00 36.60 30.00 ER0361-115 US 36 Bridges 06/22/17 34,178.00 4.00 2.34 2.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,228,787.00 2.61 2.47 2.22 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 26 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00240 Rem Asphalt Mat (Planing) Sq Yard ================================================ NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 2,723.00 5.50 7.05 6.60 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 29,364.00 6.00 2.50 2.50 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 56.00 20.00 118.33 100.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 3,816.00 3.50 3.86 2.21 CR100-292 I25/ORCHARD EMERGENCY REPAIR 08/21/17 900.00 1.00 15.32 15.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 407,624.00 1.70 2.00 2.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 4,867.00 2.50 2.65 2.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 449,350.00 2.03 2.39 2.10 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 5,290.00 8.00 2.50 2.50 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 472,201.00 4.00 3.30 2.52 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 260,437.00 2.25 1.73 1.38 MTCE092A-027 MTCE R3 FY18 SH 92 STR I-06-A 12/07/17 1,016.00 2.50 17.00 11.00 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 368,985.00 2.50 2.26 1.49 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 1,896.00 5.00 9.47 7.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,109,825.00 3.11 2.69 1.93 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,002,579.00 2.72 2.64 2.12 =============== 202-00241 Rem of Asph Mat (Planing)(Spec) Cubic Yard ============================================= STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 4,139.00 1.71 7.60 8.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4,139.00 1.71 7.60 8.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,139.00 1.71 7.60 8.75 =============== 202-00246 Rem Asphalt Mat (Planing)(Special) Sq Yard ================================================ NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 719.00 10.00 23.87 30.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 128.00 8.00 34.56 25.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 249.00 7.00 42.16 21.50 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 8,320.00 15.00 7.59 12.61 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 263.00 9.00 26.96 25.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 27 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00246 Rem Asphalt Mat (Planing)(Special) Sq Yard ================================================ STA0362-035 US 36: Strasburg to Byers 03/23/17 3,568.00 3.00 15.06 11.67 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 13,247.00 11.16 12.11 13.83 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 890.00 3.00 25.10 25.10 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 192.00 5.00 30.62 38.40 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 577.00 12.00 32.50 32.50 NHPPC120-026 US 85: I-76 to 168th 05/04/17 1,892.00 3.00 20.02 15.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 8,915.00 3.00 15.46 13.00 ER0361-115 US 36 Bridges 06/22/17 809.00 7.00 13.80 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 13,275.00 3.66 16.39 15.07 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 3,184.00 10.00 6.00 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,184.00 10.00 6.00 6.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 1,528.00 10.00 23.26 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,528.00 10.00 23.26 10.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 31,234.00 7.80 14.86 13.37 =============== 202-00250 Rem Pavement Marking Sq Foot ================================================ NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 130.00 2.50 2.60 2.75 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 83,610.00 1.00 0.84 0.80 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 31,200.00 2.00 1.59 1.20 STM0243-089 Midpoint: Station 1019+50 Cen NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 310.00 12.00 6.58 12.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 16,927.00 1.35 1.03 0.91 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 50,167.00 2.00 0.99 0.80 SHE160A-031 SH 160 Passing Lanes 03/02/17 27,941.00 1.00 1.32 1.06 NHPP 0701-230 Midpoint WB Bore 03/02/17 2,600.00 6.00 2.95 2.50 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 18,300.00 1.50 1.23 1.20 STA2873-183 US 287 Repairs at LCR 17 03/09/17 9,740.00 1.75 1.68 1.30 MTCER300-239 070A MP 0-75,131-173; 040A, 0 03/09/17 1,318,586.00 0.62 0.49 0.48 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 28 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00250 Rem Pavement Marking Sq Foot ================================================ STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 4,000.00 2.00 1.68 1.65 MTCER300-240 MTCE R3 FY 17/18 REGION WIDE 03/23/17 3,158.00 2.00 1.94 0.85 MTCE2873-191 R4 FY 17 Stencils #1 03/23/17 11,693.00 1.50 3.90 1.45 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 220.00 2.50 6.20 4.35 SW01-932 I-70 MP 146 TO 259 03/30/17 940,669.00 0.53 0.59 0.52 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,519,251.00 0.68 0.64 0.55 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 1,181.00 0.60 2.19 2.05 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 2,500.00 1.00 2.76 2.81 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 3,795.00 3.00 4.40 4.20 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 3,376.00 3.00 3.00 3.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 600.00 6.00 3.63 1.00 MPR200-235 FY 2018 PAVEMENT MARKING PROJ 06/01/17 2,120,100.00 0.40 0.60 0.42 STA0061-091 SH 6 CHIPSEAL NEAR FLEMING 06/15/17 54,439.00 0.80 0.83 0.70 MTCE141A-048 SH 141A WHITEWATER IN MESA CO 06/15/17 70,207.00 1.25 0.75 0.75 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 300.00 5.00 19.84 60.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 500.00 4.00 19.60 50.00 MTCE142A-002 SH 142 CHIPSEAL 06/22/17 494.00 3.00 5.00 5.00 MTCER300-243 R3 FY18 REGION WIDE ROUNDABOU 06/22/17 4,000.00 5.00 4.30 5.00 ER0361-115 US 36 Bridges 06/22/17 1,500.00 0.75 2.99 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,262,992.00 0.46 0.65 0.48 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 26,000.00 1.00 0.85 0.75 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 13,034.00 1.50 1.30 1.35 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 366.00 0.60 6.00 6.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 840.00 5.00 10.13 3.40 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 1,001.00 4.00 3.67 4.50 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 1,100.00 3.00 3.97 3.97 MTCE0705-085 FY 18 I-70 EPOXY FROM MM 328 08/10/17 638,968.00 0.51 0.53 0.50 NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 12,700.00 1.00 2.13 2.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 169,685.00 2.45 2.10 2.10 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 2,200.00 3.50 4.55 4.25 BRR400-354 Little-T Channel Work and SH SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 6,664.00 0.65 2.17 1.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 872,558.00 0.94 0.79 0.89 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 1,448.00 5.00 3.75 3.50 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 29 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00250 Rem Pavement Marking Sq Foot ================================================ SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 6,250.00 2.00 2.00 2.00 STRR300-228 SH 13 R3 VARIOUS CHIP SEALS 11/30/17 91,165.00 1.25 1.88 0.52 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 32,800.00 1.00 1.49 1.35 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 59,448.00 1.00 0.95 1.14 NHPP0702-351 I-70: HLT GARAGE DOOR REPLACE 12/08/17 1,360.00 5.05 4.40 4.40 STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 13,500.00 3.00 0.95 0.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 205,971.00 1.33 1.44 0.94 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,860,772.00 0.66 0.71 0.59 =============== 202-00254 Rem of Pvmt Mkg (12 In) Sq Foot ================================================ STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 2,260.00 3.00 3.49 3.50 STM0243-089 Midpoint: Station 1019+50 Cen STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 8,550.00 2.50 1.23 1.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10,810.00 2.60 1.58 1.47 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10,810.00 2.60 1.58 1.47 =============== 202-00260 Rem of Pvmt Mkg (On-Call) Sq Foot ================================================ SW01-932 I-70 MP 146 TO 259 03/30/17 54,000.00 0.65 0.66 0.56 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 54,000.00 0.65 0.66 0.56 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 54,000.00 0.65 0.66 0.56 =============== 202-00300 Rem Bldg(s) LUMP SUM =============================================== NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 1.00 10000.00 3992.17 3200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 10000.00 3992.17 3200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 10000.00 3992.17 3200.00 =============== 202-00400 Rem Bridge Each =================================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1.00 100000.00 100131.42 85840.86 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 100000.00 100131.42 85840.86 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 30 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00400 Rem Bridge Each =================================================== BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 2.00 40000.00 41042.80 27763.89 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1.00 65519.75 125000.00 125000.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 2.00 50000.00 66809.02 65000.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 49103.95 54324.72 62105.56 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 57586.63 63335.87 66061.44 =============== 202-00420 Rem Ped Rail Lin Foot =============================================== NHPP0703-433 EJMT S Bore Barrier, Handrail 04/13/17 8,440.00 10.00 5.27 2.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8,440.00 10.00 5.27 2.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,440.00 10.00 5.27 2.10 =============== 202-00425 Rem Bridge Railing Lin Foot =============================================== NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 52.00 25.00 28.30 20.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 52.00 50.00 23.35 20.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 140.00 30.00 55.21 65.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 808.00 20.00 41.66 26.26 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 216.00 25.00 58.46 61.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,268.00 23.39 46.03 35.96 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 87.00 50.00 232.18 191.55 NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 10.00 25.00 165.25 58.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 330.00 30.00 20.50 20.50 NHPPC120-026 US 85: I-76 to 168th 05/04/17 5.00 20.00 479.43 250.00 STA0061-091 SH 6 CHIPSEAL NEAR FLEMING 06/15/17 187.00 60.00 17.17 16.00 ER0361-115 US 36 Bridges 06/22/17 40.00 50.00 14.21 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 659.00 42.22 65.10 43.48 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,927.00 29.83 50.83 38.53 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 31 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00426 Rem Bridge Railing (Spec) Lin Foot =============================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 71.00 46.00 48.00 48.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 71.00 46.00 48.00 48.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 71.00 46.00 48.00 48.00 =============== 202-00450 Rem Port Present Str (1) Sq Yard ================================================ BR0252-449 I-25 Woodmen NB 03/02/17 564.00 140.00 82.25 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 564.00 140.00 82.25 40.00 NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 1,035.00 180.00 72.25 88.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,035.00 180.00 72.25 88.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,599.00 165.89 75.78 71.07 =============== 202-00453 Rem Port Present Str (2) Sq Yard ================================================ NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 207.00 300.00 285.91 300.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 8.00 300.00 571.40 975.00 BR0252-449 I-25 Woodmen NB 03/02/17 136.00 270.00 251.25 205.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 1,904.00 250.00 167.95 175.84 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 14.00 300.00 422.92 350.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 154.00 600.00 467.33 349.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,423.00 278.09 204.32 202.78 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 46.00 510.00 506.00 506.00 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 148.00 350.00 250.17 248.50 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 19.00 300.00 596.64 600.00 NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 396.00 350.00 218.50 135.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 32.00 400.00 360.00 360.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 215.00 575.00 297.17 160.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 1,366.00 500.00 247.33 280.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,222.00 467.59 250.13 249.02 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 32 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00453 Rem Port Present Str (2) Sq Yard ================================================ NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 26.00 500.00 325.00 325.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 26.00 500.00 325.00 325.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 153.00 300.00 473.72 430.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 115.00 325.00 273.12 294.35 MTCE092A-027 MTCE R3 FY18 SH 92 STR I-06-A 12/07/17 19.00 350.00 415.00 245.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 287.00 313.33 411.55 363.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,958.00 366.22 241.69 233.44 =============== 202-00460 Rem Port Present Str (3) Sq Yard ================================================ NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 7.00 450.00 608.41 600.00 BR0252-449 I-25 Woodmen NB 03/02/17 54.00 505.00 400.00 400.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 95.00 500.00 401.67 420.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 29.00 700.00 741.18 641.52 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 185.00 530.92 454.94 455.70 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 58.00 550.00 394.60 403.80 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 2.00 444.00 1814.14 1700.00 NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 70.00 700.00 440.25 195.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 17.00 500.00 300.00 300.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 43.00 600.00 747.13 650.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 107.00 550.00 509.05 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 297.00 589.02 505.00 643.84 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 3.00 750.00 1200.00 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 750.00 1200.00 1200.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 33 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00460 Rem Port Present Str (3) Sq Yard ================================================ NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 15.00 600.00 1202.32 850.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 12.00 450.00 606.58 659.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 27.00 533.33 1009.11 765.44 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 512.00 566.03 520.94 585.53 =============== 202-00495 Rem Port Present Str LUMP SUM =============================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1.00 5000.00 14550.00 15000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 5000.00 14550.00 15000.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1.00 15000.00 22574.69 15072.01 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 15000.00 22574.69 15072.01 STA094A-034 Critical Culvert Project on S 10/05/17 1.00 15000.00 6029.81 6800.00 NHPP0702-351 I-70: HLT GARAGE DOOR REPLACE 12/08/17 1.00 8893.70 15143.60 15143.60 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 1.00 30000.00 14937.77 25694.38 BR3852-018 POA SCOUR US 385 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 17964.57 10794.44 15879.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 14778.74 15798.84 15542.00 =============== 202-00500 Rem Port Present Str Each =================================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 20.00 206.05 775.00 775.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20.00 206.05 775.00 775.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 1.00 5000.00 1187.00 2460.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 34 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00500 Rem Port Present Str Each =================================================== NHPP0702-351 I-70: HLT GARAGE DOOR REPLACE 12/08/17 2.00 14920.65 18766.75 18766.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 11613.77 8218.90 13331.17 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 23.00 1694.01 2263.78 2412.76 =============== 202-00502 Rem Port Present Str Cubic Yard ============================================= NHPP 0701-230 Midpoint WB Bore 03/02/17 4.00 2000.00 4891.92 2665.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 2000.00 4891.92 2665.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 4.30 327.34 2300.00 2300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.30 327.34 2300.00 2300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.30 1133.44 4208.16 2475.90 =============== 202-00503 Rem Port Present Str Sq Yard ================================================ NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 47.00 300.00 533.41 450.00 BR0252-449 I-25 Woodmen NB 03/02/17 1.00 400.00 1718.75 1775.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 48.00 302.08 581.79 477.60 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 46.00 300.00 870.00 870.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 46.00 300.00 870.00 870.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 14.00 850.00 421.80 365.40 MTCE092A-027 MTCE R3 FY18 SH 92 STR I-06-A 12/07/17 3.00 500.00 2800.00 2700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 17.00 788.24 841.48 777.39 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 111.00 375.68 717.70 686.13 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 35 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00504 Rem Exp Device Lin Foot =============================================== BR0252-449 I-25 Woodmen NB 03/02/17 257.00 231.00 225.75 155.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 360.00 200.00 184.92 193.76 STA0362-035 US 36: Strasburg to Byers 03/23/17 112.00 400.00 355.28 305.11 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 729.00 241.66 225.51 197.20 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 59.00 195.00 141.69 220.50 NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 718.00 350.00 302.13 151.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 42.00 150.00 80.00 80.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 349.00 350.00 178.13 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,168.00 334.98 252.23 139.71 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 271.00 475.00 150.00 150.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 351.00 152.83 150.00 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 622.00 293.20 150.00 150.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 583.00 300.00 312.24 230.00 MTCE092A-027 MTCE R3 FY18 SH 92 STR I-06-A 12/07/17 90.00 120.00 279.33 88.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 673.00 275.93 309.45 211.01 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,192.00 293.07 257.15 169.88 =============== 202-00520 Rem of Exp Joint Matl Lin Foot =============================================== STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 60.00 60.00 58.34 51.77 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 60.00 60.00 58.34 51.77 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 60.00 60.00 58.34 51.77 =============== 202-00700 Rem Light Standard Each =================================================== STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 2.00 400.00 357.50 200.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 36 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00700 Rem Light Standard Each =================================================== STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 1.00 800.00 2143.40 717.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 533.33 1349.67 372.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 533.33 1349.67 372.33 =============== 202-00705 Rem Light Standard Foundation Each =================================================== SHE160A-031 SH 160 Passing Lanes 03/02/17 3.00 500.00 916.85 777.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 500.00 916.85 777.78 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 26.00 250.00 485.00 485.00 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 2.00 400.00 620.00 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 28.00 260.71 503.00 486.07 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 4.00 500.00 1078.64 950.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 500.00 1078.64 950.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 1.00 500.00 1213.67 840.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 500.00 1213.67 840.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 36.00 313.89 777.96 571.76 =============== 202-00710 Rem Power Pole Each =================================================== STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 3.00 445.00 6060.00 6060.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 445.00 6060.00 6060.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 445.00 6060.00 6060.00 =============== 202-00725 Rem Ex Lighting Sys LUMP SUM =============================================== NHPP 0701-230 Midpoint WB Bore 03/02/17 1.00 131000.00 75938.00 66200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 131000.00 75938.00 66200.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 37 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00725 Rem Ex Lighting Sys LUMP SUM =============================================== IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 1.00 10000.00 6500.00 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 10000.00 6500.00 5000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 70500.00 41219.00 35600.00 =============== 202-00750 Rem Luminaire Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1.00 150.00 158.00 140.00 NHPP 0701-230 Midpoint WB Bore 03/02/17 426.00 100.00 196.83 128.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 427.00 100.12 196.68 128.03 STA0703-437 I-70: 32ND TO 44TH 06/01/17 20.00 200.00 196.57 520.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20.00 200.00 196.57 520.00 NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 4.00 160.00 650.00 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 160.00 650.00 1100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 451.00 105.08 199.32 154.03 =============== 202-00805 Rem Overhead Sign Str Each =================================================== MTCE0253-259 I25 FROM MP 229.29 TO MP 244. 06/22/17 8.00 5000.00 4303.50 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 5000.00 4303.50 5000.00 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 1.00 4000.00 5035.83 5000.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 1.00 5000.00 7134.70 6250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 4500.00 5989.86 5625.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 4900.00 4990.54 5125.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 38 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00806 Rem Walkway Lin Foot =============================================== NHPP0703-433 EJMT S Bore Barrier, Handrail 04/13/17 8,769.00 25.00 11.66 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8,769.00 25.00 11.66 6.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,769.00 25.00 11.66 6.00 =============== 202-00810 Rem Ground Sign Each =================================================== NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 3.00 100.00 215.06 220.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 243.00 93.00 65.31 70.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 130.00 75.00 74.59 85.00 STM0243-089 Midpoint: Station 1019+50 Cen MTCER100-274 MTCE R1 FY 17 SH 119 Signing 01/26/17 58.00 80.00 78.13 75.00 IM025A-039 I-25 Critical Culvert at MP 1 02/09/17 2.00 150.00 185.82 107.25 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 17.00 120.00 103.69 53.56 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 5.00 150.00 122.20 19.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 17.00 150.00 170.36 255.00 SHE160A-031 SH 160 Passing Lanes 03/02/17 46.00 90.53 69.07 33.33 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 151.00 85.00 101.77 260.00 STA2873-183 US 287 Repairs at LCR 17 03/09/17 4.00 150.00 184.33 145.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 2.00 90.88 120.93 85.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 5.00 100.00 120.00 80.00 MTCER300-238 MTCE R3 FY 17/18 REGION WIDE 03/30/17 311.00 55.00 63.75 65.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 97.00 72.00 74.03 90.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,091.00 78.18 76.53 101.38 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 8.00 95.00 100.00 100.00 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 169.00 75.00 44.57 31.22 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 13.00 100.00 60.96 44.14 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 6.00 50.00 43.51 31.50 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 1.00 200.00 421.67 480.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 31.00 100.00 135.00 135.00 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 8.00 100.00 105.00 100.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 33.00 100.00 159.19 110.00 MTCE0253-259 I25 FROM MP 229.29 TO MP 244. 06/22/17 252.00 80.00 140.50 200.00 ER0361-115 US 36 Bridges 06/22/17 16.00 90.00 84.63 85.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 537.00 82.00 95.28 126.06 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 10.00 100.00 221.00 100.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 39 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00810 Rem Ground Sign Each =================================================== NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 41.00 100.00 107.50 160.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 4.00 100.00 151.67 180.00 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 2.00 60.00 500.00 350.00 NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 10.00 94.00 210.00 200.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 393.00 151.52 79.00 79.00 MPR200-244 REGION 2 FY18 SIGNING PROJECT 09/14/17 709.00 50.00 100.00 60.00 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 4.00 110.00 185.20 76.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,173.00 86.95 101.97 72.35 C0702-372 I-70 GWC Rockfall Fence Impro 10/12/17 6.00 100.00 610.00 1000.00 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 7.00 2000.00 2968.33 50.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 18.00 100.00 55.67 82.00 C133A-042 SH 133 McClure Pass Slip 11/16/17 11.00 85.00 127.02 100.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 10.00 100.00 108.80 100.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 2.00 100.00 184.50 178.50 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 5.00 60.00 154.91 207.03 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 59.00 319.24 565.32 191.83 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,860.00 87.47 102.13 95.85 =============== 202-00815 Rem of Sign (Special) Each =================================================== NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 4.00 150.00 200.00 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 150.00 200.00 200.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 2.00 1000.00 2547.00 2547.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 1000.00 2547.00 2547.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 433.33 982.33 982.33 =============== 202-00821 Rem Sign Panel Each =================================================== NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 2.00 200.00 116.20 105.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 31.00 47.52 62.88 100.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 40 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00821 Rem Sign Panel Each =================================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 8.00 50.00 163.11 45.00 STM0243-089 Midpoint: Station 1019+50 Cen MTCER100-274 MTCE R1 FY 17 SH 119 Signing 01/26/17 671.00 40.00 46.25 45.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 3.00 58.00 71.28 42.85 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 2.00 65.00 44.60 26.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 33.00 40.00 44.04 35.70 SHE160A-031 SH 160 Passing Lanes 03/02/17 1.00 59.18 107.56 111.11 MTCER300-238 MTCE R3 FY 17/18 REGION WIDE 03/30/17 1,950.00 20.00 21.50 6.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 27.00 55.00 44.58 24.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,728.00 26.13 29.06 17.44 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 20.00 50.00 76.50 76.50 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 34.00 40.00 39.82 31.22 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 2.00 39.00 66.44 82.70 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 10.00 100.00 53.08 33.10 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 16.00 60.00 50.00 50.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 13.00 50.00 62.22 60.00 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 10.00 35.00 142.50 200.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 15.00 75.00 406.75 1100.00 MTCE0253-259 I25 FROM MP 229.29 TO MP 244. 06/22/17 15.00 60.00 192.00 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 135.00 54.99 117.68 204.95 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 2.00 100.00 175.00 175.00 NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 18.00 52.00 160.00 100.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 6.00 151.52 157.00 157.00 MPR200-244 REGION 2 FY18 SIGNING PROJECT 09/14/17 389.00 45.00 21.00 8.00 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 3.00 100.00 130.24 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 418.00 47.49 27.33 15.92 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 13.00 75.00 60.27 40.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 13.00 75.00 60.27 40.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,294.00 30.22 31.90 25.03 =============== 202-00823 Rem Dynamic Message Sign Each =================================================== NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 113.00 750.00 1300.20 950.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 113.00 750.00 1300.20 950.40 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 41 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00823 Rem Dynamic Message Sign Each =================================================== ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 2.00 2000.00 3743.83 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 2000.00 3743.83 5000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 115.00 771.74 1423.41 1020.83 =============== 202-00825 Rem Flashing Beacon Each =================================================== STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 6.00 850.00 457.50 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 850.00 457.50 200.00 MPR200-244 REGION 2 FY18 SIGNING PROJECT 09/14/17 1.00 450.00 466.67 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 450.00 466.67 100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 792.86 459.33 185.71 =============== 202-00827 Rem of Pull Box Each =================================================== NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 1.00 500.00 785.50 1071.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 4.00 200.00 213.07 135.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 8.00 300.00 251.00 215.00 SHE160A-031 SH 160 Passing Lanes 03/02/17 1.00 100.00 269.25 222.22 NHPP 0701-230 Midpoint WB Bore 03/02/17 23.00 200.00 201.36 275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 37.00 227.03 230.39 274.52 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 7.00 250.00 130.42 110.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 6.00 175.00 110.00 110.00 STAR400-348 Region 4 Controller and Cabin 05/04/17 6.00 200.00 290.00 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 19.00 210.53 148.00 233.16 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 42 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00827 Rem of Pull Box Each =================================================== ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 1.00 250.00 457.50 165.00 CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 1.00 250.00 415.00 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 250.00 436.25 122.50 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 1.00 250.00 603.33 510.00 ITSSW02-003 ITS FIBER INSTALLATIONS FOR H 11/30/17 10.00 200.00 323.10 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 11.00 204.55 342.65 273.64 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 69.00 219.57 220.63 258.11 =============== 202-00828 Rem Traf Sig Equipment LUMP SUM =============================================== STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 1.00 1500.00 2908.91 2651.74 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1.00 20000.00 14560.00 13000.00 MTCER300-233 MTCE R3 FY17/18 Signal Replac 03/02/17 1.00 75000.00 144008.00 86000.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 1.00 7500.00 36371.67 12615.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 26000.00 56917.61 28566.69 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 1.00 7500.00 16900.00 16900.00 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 1.00 14600.00 14425.20 5925.60 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 1.00 15000.00 5400.00 5400.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 1.00 5000.00 6742.69 6500.00 STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 1.00 4000.00 5330.00 1650.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 11611.11 11422.24 6675.33 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 1.00 15000.00 25000.00 25000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 15000.00 25000.00 25000.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 1.00 5000.00 6133.67 8400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 5000.00 6133.67 8400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 15233.33 27547.53 13849.65 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 43 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00830 Rem Traf Sig Face Each =================================================== STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 52.00 60.00 48.68 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 52.00 60.00 48.68 60.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 52.00 60.00 48.68 60.00 =============== 202-00831 Rem Traf Sig Head Each =================================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 6.00 175.00 160.50 70.00 STM0243-089 Midpoint: Station 1019+50 Cen -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 175.00 160.50 70.00 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 1.00 200.00 87.05 82.70 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1.00 250.00 171.37 165.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 225.00 154.51 123.85 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 6.00 110.00 110.00 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 110.00 110.00 110.00 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 6.00 250.00 192.50 185.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 250.00 192.50 185.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 183.00 160.34 131.04 =============== 202-00832 Rem of Sign Panel (Spec) Each =================================================== NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 3.00 500.00 400.00 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 500.00 400.00 400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 500.00 400.00 400.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 44 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00840 Rem Traf Sig Pole Each =================================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 2.00 3000.00 1100.71 1102.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 3000.00 1100.71 1102.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 3000.00 1100.71 1102.00 =============== 202-00845 Rem Traf Sig Controller Each =================================================== SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 2.00 750.00 233.67 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 750.00 233.67 140.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 750.00 233.67 140.00 =============== 202-00848 Rem Traf Sig Control+Cab Each =================================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1.00 1000.00 703.11 661.00 STAR400-348 Region 4 Controller and Cabin 05/04/17 16.00 700.00 1567.50 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 17.00 717.65 1331.76 2391.82 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17.00 717.65 1331.76 2391.82 =============== 202-00855 Rem Traf Sig Control Cab Each =================================================== NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 8.00 1000.00 1155.00 360.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 1000.00 1155.00 360.00 CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 24.00 1250.00 1255.00 1010.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 24.00 1250.00 1255.00 1010.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 32.00 1187.50 1230.00 847.50 =============== 202-00858 Rem Pedestal Pole Each =================================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 1.00 325.00 2535.82 6670.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 325.00 2535.82 6670.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 45 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00858 Rem Pedestal Pole Each =================================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1.00 1500.00 337.25 275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 1500.00 337.25 275.00 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 1.00 325.00 487.50 475.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 325.00 487.50 475.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 716.67 742.91 2473.33 =============== 202-00860 Rem Ped Push Button Each =================================================== STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 9.00 35.00 30.17 26.52 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9.00 35.00 30.17 26.52 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 5.00 100.00 45.50 41.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 100.00 45.50 41.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 58.21 34.32 31.69 =============== 202-00870 Rem Coordination Unit Each =================================================== IM0762-052 FIBER OPTICS AND ITS DEVICES 08/03/17 1.00 100.00 5402.00 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 100.00 5402.00 2500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 100.00 5402.00 2500.00 =============== 202-00888 Rem Video Detect Sys Each =================================================== STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 8.00 250.00 816.00 230.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 250.00 816.00 230.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 250.00 816.00 230.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 46 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00889 Rem of Detect Warning Each =================================================== STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 1.00 200.00 625.75 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 200.00 625.75 1000.00 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 1.00 1000.00 248.00 275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1000.00 248.00 275.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 600.00 415.89 637.50 =============== 202-00895 Rem of Impact Attenuator Each =================================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 17.00 2097.63 2783.00 2783.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 17.00 2097.63 2783.00 2783.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 6.00 1260.00 331.73 195.18 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 1260.00 331.73 195.18 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 23.00 1879.12 1522.35 2107.92 =============== 202-00950 Rem Conc Found/Slab Sq Yard ================================================ ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 2.00 450.32 2000.00 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 450.32 2000.00 2000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 450.32 2000.00 2000.00 =============== 202-01000 Rem Fence Lin Foot =============================================== STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 68.00 3.00 10.50 10.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 132.00 5.00 11.40 5.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 47 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01000 Rem Fence Lin Foot =============================================== STM0243-089 Midpoint: Station 1019+50 Cen IM025A-039 I-25 Critical Culvert at MP 1 02/09/17 242.00 3.50 4.11 1.40 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 560.00 25.00 9.75 1.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,002.00 15.68 8.11 2.34 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 12.00 25.00 35.33 48.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12.00 25.00 35.33 48.00 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 20,654.00 1.00 0.88 0.45 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 2,021.00 2.00 1.92 1.70 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 371.00 3.00 2.83 1.50 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 732.00 1.50 3.40 3.25 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 23,778.00 1.13 1.24 0.66 C133A-042 SH 133 McClure Pass Slip 11/16/17 402.00 3.00 7.86 20.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 214.00 2.00 10.58 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 616.00 2.65 8.54 14.79 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25,408.00 1.75 1.70 1.09 =============== 202-01010 Rem Silt Fence Lin Foot =============================================== STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 123.00 5.50 0.68 0.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 123.00 5.50 0.68 0.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 123.00 5.50 0.68 0.30 =============== 202-01015 Rem Rockfall Fence Lin Foot =============================================== C0702-372 I-70 GWC Rockfall Fence Impro 10/12/17 685.00 100.00 210.00 195.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 685.00 100.00 210.00 195.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 685.00 100.00 210.00 195.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 48 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01030 Rem of Road Closure Gate Each =================================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 2.00 1000.00 1064.90 700.00 STM0243-089 Midpoint: Station 1019+50 Cen SHE160A-031 SH 160 Passing Lanes 03/02/17 1.00 900.00 1163.75 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 966.67 1117.62 850.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 966.67 1117.62 850.00 =============== 202-01035 Rem of Gate Each =================================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 2.00 200.00 709.16 400.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1.00 350.00 272.00 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 250.00 527.01 450.00 ER0361-115 US 36 Bridges 06/22/17 1.00 350.00 176.79 135.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 350.00 176.79 135.00 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 10.00 400.00 133.65 150.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 2.00 250.00 263.07 226.65 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 1.00 200.00 141.70 122.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 13.00 361.54 173.35 159.64 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17.00 341.18 213.96 194.39 =============== 202-01130 Rem Gdrail Ty 3 Lin Foot =============================================== NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 450.00 6.00 4.18 6.00 NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 416.00 10.00 34.03 62.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 3,034.00 8.50 4.39 4.00 NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 1,225.00 6.00 7.11 6.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 1,119.00 5.00 5.32 3.34 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 49 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01130 Rem Gdrail Ty 3 Lin Foot =============================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 3,263.00 7.00 5.50 6.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 2,959.00 4.00 3.55 3.32 SHE160A-031 SH 160 Passing Lanes 03/02/17 475.00 505.00 13.98 5.56 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 1,743.00 5.00 8.29 7.50 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 81.00 4.00 22.97 8.75 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 19,796.00 5.00 3.53 3.64 STA0362-035 US 36: Strasburg to Byers 03/23/17 990.00 3.00 4.85 4.47 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 1,670.00 3.50 8.02 10.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 9,931.00 3.30 3.88 4.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 47,152.00 9.96 5.03 4.90 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 3,317.00 3.00 2.27 1.56 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 914.00 2.00 4.58 3.31 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 5,250.00 4.75 3.37 3.15 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 757.00 4.00 4.25 4.25 NHPPC120-026 US 85: I-76 to 168th 05/04/17 5,772.00 3.00 1.57 1.50 STA0703-437 I-70: 32ND TO 44TH 06/01/17 1,671.00 3.00 5.86 6.00 STA0061-091 SH 6 CHIPSEAL NEAR FLEMING 06/15/17 418.00 4.70 4.50 4.00 MTCE0253-259 I25 FROM MP 229.29 TO MP 244. 06/22/17 288.00 7.00 9.22 14.00 ER0361-115 US 36 Bridges 06/22/17 674.00 4.50 3.88 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 19,061.00 3.62 3.31 2.89 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 1,650.00 10.00 4.44 3.50 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 2,500.00 4.00 4.55 6.75 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 352.00 5.00 7.83 7.00 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 50.00 3.23 28.90 29.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 19,329.00 3.00 3.15 3.15 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 1,229.00 5.00 4.39 4.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 25,110.00 3.69 4.06 3.68 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 55.00 5.00 18.17 45.90 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 1,138.00 4.00 4.33 4.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 12,534.00 4.50 4.58 4.14 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 15,320.00 5.00 4.14 4.23 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 9,309.00 5.00 3.44 3.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 38,356.00 4.81 4.11 4.02 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 129,679.00 6.29 4.32 4.11 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 50 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01140 Rem Gdrail Ty 4 Lin Foot =============================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1,970.00 27.00 19.80 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,970.00 27.00 19.80 4.00 NHPP0703-433 EJMT S Bore Barrier, Handrail 04/13/17 8,819.00 20.00 26.22 24.75 NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 57.00 25.00 185.75 230.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8,876.00 20.03 26.73 26.07 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 10.00 25.00 176.96 170.00 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 2,759.00 15.00 28.01 31.53 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,769.00 15.04 28.54 32.03 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13,615.00 20.02 26.28 24.09 =============== 202-01170 Rem Gdrail Ty 7 Lin Foot =============================================== SHE160A-031 SH 160 Passing Lanes 03/02/17 114.00 60.00 40.50 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 114.00 60.00 40.50 10.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 24.00 35.00 99.94 50.00 ER0361-115 US 36 Bridges 06/22/17 650.00 25.00 7.51 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 674.00 25.36 9.73 12.39 CR100-292 I25/ORCHARD EMERGENCY REPAIR 08/21/17 160.00 1.00 96.29 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 160.00 1.00 96.29 55.00 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 160.00 20.00 28.13 15.62 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 51 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01170 Rem Gdrail Ty 7 Lin Foot =============================================== NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 268.00 15.00 93.38 100.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 60.00 20.00 90.30 60.90 ITSSW01-831 ITS WEATHER STATION UPGRADES 11/30/17 40.00 20.00 77.69 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 528.00 17.46 68.63 69.99 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,476.00 22.57 36.74 37.43 =============== 202-01180 Rem Median Barrier Lin Foot =============================================== NHPP 0701-230 Midpoint WB Bore 03/02/17 1,450.00 30.00 36.06 22.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,450.00 30.00 36.06 22.80 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 915.00 85.00 9.31 7.51 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 915.00 85.00 9.31 7.51 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 156.00 25.00 22.00 27.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 156.00 25.00 22.00 27.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 220.00 50.00 102.18 108.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 220.00 50.00 102.18 108.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,741.00 49.68 30.70 24.77 =============== 202-01300 Rem End Anchorage Each =================================================== NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 8.00 300.00 254.55 300.00 NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 2.00 500.00 333.69 228.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 8.00 400.00 238.53 206.84 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 16.00 210.00 295.00 275.00 SHE160A-031 SH 160 Passing Lanes 03/02/17 3.00 156.00 468.06 444.44 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 52 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01300 Rem End Anchorage Each =================================================== NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 2.00 300.00 403.00 350.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 54.00 300.00 184.37 190.40 STA0362-035 US 36: Strasburg to Byers 03/23/17 4.00 250.00 411.81 226.63 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 2.00 250.00 464.00 750.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 34.00 330.00 229.65 242.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 133.00 300.36 254.13 239.55 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 71.00 300.00 228.69 156.08 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 6.00 500.00 301.29 215.00 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 8.00 270.00 394.75 372.75 NHPPC120-026 US 85: I-76 to 168th 05/04/17 31.00 250.00 130.33 125.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 19.00 250.00 374.82 210.00 MTCE0253-259 I25 FROM MP 229.29 TO MP 244. 06/22/17 4.00 300.00 521.00 825.00 ER0361-115 US 36 Bridges 06/22/17 8.00 300.00 227.46 220.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 147.00 289.52 257.98 192.37 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 2.00 300.00 427.00 500.00 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 2.00 300.00 466.67 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 300.00 441.88 450.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 7.00 200.00 140.33 205.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 1.00 250.00 879.00 225.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 35.00 240.00 232.37 212.10 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 40.00 250.00 315.33 221.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 83.00 241.57 286.42 216.26 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 367.00 282.72 265.54 217.68 =============== 202-01400 Removal of Cattle Guard Each =================================================== NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 1.00 2500.00 2140.00 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 2500.00 2140.00 2500.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 53 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01400 Removal of Cattle Guard Each =================================================== STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 1.00 4000.00 7990.34 7500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 4000.00 7990.34 7500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 3250.00 4740.15 5000.00 =============== 202-04000 Plug Structure Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1.00 800.00 1820.00 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 800.00 1820.00 5000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 800.00 1820.00 5000.00 =============== 202-04001 Plug Culvert Each =================================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 4.00 750.00 3241.54 2000.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 3.00 500.00 3900.00 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7.00 642.86 3582.12 3800.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 1.00 1000.00 760.00 760.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 3.00 3500.00 1702.50 890.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 2875.00 1630.00 857.50 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 1.00 1000.00 2892.00 875.00 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 1.00 2000.00 11212.77 17699.40 BR3852-018 POA SCOUR US 385 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 1500.00 8716.54 9287.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13.00 1461.54 4081.48 3727.67 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 54 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-04002 Clean Culvert Each =================================================== IM025A-039 I-25 Critical Culvert at MP 1 02/09/17 2.00 1750.00 3094.95 322.65 STA0931-032 SH 93 Erosion Correction 02/09/17 2.00 2500.00 4517.41 2175.00 SHE160A-031 SH 160 Passing Lanes 03/02/17 8.00 2500.00 2934.25 2812.50 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 16.00 2000.00 1466.00 2900.00 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 1.00 5000.00 3514.45 4500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 29.00 2258.62 2401.04 2703.29 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 61.00 800.00 2266.72 1025.15 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 7.00 2500.00 2005.89 1574.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 1.00 1850.00 3265.68 797.04 NHPPC120-026 US 85: I-76 to 168th 05/04/17 24.00 700.01 1516.26 1200.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 10.00 2500.00 1786.16 2400.00 ER0361-115 US 36 Bridges 06/22/17 6.00 2500.00 2665.32 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 109.00 1146.33 2080.55 1276.60 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 3.00 1500.00 7933.33 15000.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 2.00 3500.00 1994.45 1000.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 2300.00 3718.64 9400.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 10.00 2000.00 3249.10 3250.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 5.00 2550.00 3713.23 4139.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 15.00 2183.33 3356.21 3546.57 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 158.00 1485.44 2356.00 2011.03 =============== 202-04003 Clean Culvert (Spec) Each =================================================== STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 42.00 1500.00 1292.70 1200.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 3.00 1500.00 2133.33 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 45.00 1500.00 1335.44 1220.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 55 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-04003 Clean Culvert (Spec) Each =================================================== SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 20.00 300.00 1068.40 1275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20.00 300.00 1068.40 1275.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 65.00 1130.77 1239.04 1236.92 =============== 202-04005 Clean Valve Box Each =================================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 175.00 300.00 270.48 75.50 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 6.00 307.14 294.57 290.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 1.00 390.00 761.74 589.69 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 182.00 300.73 274.20 85.40 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 79.00 300.00 196.00 196.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 80.00 280.00 125.05 75.00 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 46.00 258.00 184.34 190.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 205.00 282.77 161.62 147.43 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 4.00 250.00 365.00 365.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 250.00 365.00 365.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 391.00 290.79 229.10 120.78 =============== 202-04006 Clean Culvert Hour =================================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 80.00 300.00 350.00 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 80.00 300.00 350.00 350.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 80.00 300.00 350.00 350.00 =============== 202-04010 Clean Inlet Each =================================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 162.00 600.00 958.90 252.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 56 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-04010 Clean Inlet Each =================================================== STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 2.00 1000.00 1324.00 2500.00 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 33.00 1000.00 960.67 892.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 2.00 900.00 1976.94 1769.07 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 199.00 673.37 974.26 395.97 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 10.00 600.00 1130.00 1130.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 37.00 1000.00 366.83 150.00 NHPP0703-433 EJMT S Bore Barrier, Handrail 04/13/17 113.00 1200.00 638.15 480.00 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 5.00 731.00 1530.44 1500.00 NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 10.00 1250.00 693.75 785.00 ER0361-115 US 36 Bridges 06/22/17 1.00 2500.00 689.75 625.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 176.00 1120.77 638.87 494.69 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 7.00 1000.00 1000.00 1000.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1.00 393.19 1286.00 1286.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 924.15 1035.75 1035.75 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 178.00 1000.00 548.46 180.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 178.00 1000.00 548.46 180.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 561.00 920.94 687.42 367.54 =============== 202-04050 Clean Exp Joint Lin Foot =============================================== BR0252-449 I-25 Woodmen NB 03/02/17 965.00 20.00 22.00 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 965.00 20.00 22.00 11.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 60.00 45.00 27.22 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 60.00 45.00 27.22 6.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 57 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-04050 Clean Exp Joint Lin Foot =============================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 84.00 50.00 29.00 29.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 84.00 50.00 29.00 29.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,109.00 23.62 22.44 12.09 =============== 202-05004 Sawing Concrete (4 In) Lin Foot =============================================== NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 375.00 6.00 3.50 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 375.00 6.00 3.50 4.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 375.00 6.00 3.50 4.00 =============== 202-05008 Sawing Concrete (8 In) Lin Foot =============================================== STAR400-348 Region 4 Controller and Cabin 05/04/17 94.00 10.00 138.00 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 94.00 10.00 138.00 250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 94.00 10.00 138.00 250.00 =============== 202-05026 Sawing Asphalt Mat (6 In) Lin Foot =============================================== IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 1,930.00 3.50 3.33 3.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,930.00 3.50 3.33 3.50 STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 8,513.00 3.00 3.07 1.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8,513.00 3.00 3.07 1.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10,443.00 3.09 3.09 1.46 =============== 202-05030 Sawing Asphalt Mat (10 In) Lin Foot =============================================== STAR400-348 Region 4 Controller and Cabin 05/04/17 21.00 10.00 144.00 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 21.00 10.00 144.00 250.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 58 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-05030 Sawing Asphalt Mat (10 In) Lin Foot =============================================== SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 18,036.00 5.00 3.89 2.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 18,036.00 5.00 3.89 2.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18,057.00 5.01 3.96 2.89 =============== 202-05100 Sandblasting Reinf Steel Sq Yard ================================================ NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 47.00 40.00 38.00 38.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 47.00 40.00 38.00 38.00 MTCE092A-027 MTCE R3 FY18 SH 92 STR I-06-A 12/07/17 42.00 40.00 55.67 42.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 42.00 40.00 55.67 42.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 89.00 40.00 50.87 39.89 =============== 202-06530 Clean Drain Pipe (Spec) Each =================================================== STA2873-183 US 287 Repairs at LCR 17 03/09/17 10.00 2000.00 2202.00 3380.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 2000.00 2202.00 3380.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 2000.00 2202.00 3380.00 =============== 202-07200 Rem of Temporary Stream Crossing Each =================================================== ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 2.00 30000.00 30000.00 30000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 30000.00 30000.00 30000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 30000.00 30000.00 30000.00 =============== 203-00000 Uncl Excav Cubic Yard ============================================= NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 598.00 25.00 36.39 52.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 59 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00000 Uncl Excav Cubic Yard ============================================= NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 24.00 100.00 311.20 75.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 212.00 112.00 89.83 41.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 834.00 49.27 70.69 50.02 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 1,403.00 36.00 36.41 8.49 ER0341-093 PR US 34 BIG THOMPSON CANYON 06/28/17 18,900.00 17.25 17.25 17.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20,303.00 18.55 20.74 16.64 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 30.00 60.00 72.50 60.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 9,946.00 26.00 25.01 20.00 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 41.00 100.00 214.00 62.00 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 2,510.00 22.00 17.67 4.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 556.00 45.00 23.67 40.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 171.00 50.22 85.00 85.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 13,254.00 26.66 24.47 18.87 C0702-372 I-70 GWC Rockfall Fence Impro 10/12/17 50.00 200.00 250.00 250.00 STRR300-228 SH 13 R3 VARIOUS CHIP SEALS 11/30/17 2,909.00 30.00 27.44 13.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,959.00 32.87 29.33 17.74 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 37,350.00 23.25 25.27 18.27 =============== 203-00010 Uncl Excav (CIP) Cubic Yard ============================================= NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 19.40 30.00 36.65 30.25 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 2,864.00 13.00 24.13 10.00 STA0931-032 SH 93 Erosion Correction 02/09/17 81.00 275.00 85.08 125.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 685.00 43.00 110.71 97.48 SHE160A-031 SH 160 Passing Lanes 03/02/17 12,496.00 20.00 12.38 13.23 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 280.00 25.00 87.75 47.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 400.00 46.50 58.68 70.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16,825.40 21.70 17.11 18.58 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 60 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00010 Uncl Excav (CIP) Cubic Yard ============================================= STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 30.00 30.00 129.00 129.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 72,044.00 20.00 9.17 2.10 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 19,740.00 5.00 13.35 9.77 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 240.00 100.00 183.00 144.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 2,646.00 30.01 36.39 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 94,700.00 17.36 9.95 4.74 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 2,385.00 15.00 24.20 17.00 NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 115.00 80.00 96.50 90.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 423,391.00 26.94 46.00 46.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 425,891.00 26.89 45.43 45.85 C133A-042 SH 133 McClure Pass Slip 11/16/17 930.00 40.00 81.88 68.00 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 9,653.00 15.00 16.70 8.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 1,293.00 35.10 21.72 13.15 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 353.00 100.00 75.23 91.16 CC0341-100 US 34 BIG THOMPSON CANYON MOO 12/11/17 5,709.00 20.58 24.50 24.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 17,938.00 21.19 25.21 18.37 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 555,354.40 24.92 20.85 37.13 =============== 203-00012 Uncl Excav (CIP) (Spec) Cubic Yard ============================================= ER0361-115 US 36 Bridges 06/22/17 10,155.00 20.00 11.18 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10,155.00 20.00 11.18 12.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10,155.00 20.00 11.18 12.00 =============== 203-00014 Uncl Ex (River Bttm Matl Salv and Repl) Cubic Yard ============================================= ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 20,558.00 33.95 50.00 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20,558.00 33.95 50.00 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20,558.00 33.95 50.00 50.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 61 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00015 Uncl Ex (Channel Grading) Cubic Yard ============================================= ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 5,675.00 62.06 100.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5,675.00 62.06 100.00 100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,675.00 62.06 100.00 100.00 =============== 203-00040 Uncl Excav (Spec) Cubic Yard ============================================= CC0341-100 US 34 BIG THOMPSON CANYON MOO 12/11/17 3,991.00 22.63 30.87 30.87 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,991.00 22.63 30.87 30.87 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,991.00 22.63 30.87 30.87 =============== 203-00050 Unsuitable Material Cubic Yard ============================================= STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 1,330.00 17.00 16.99 10.00 STM0243-089 Midpoint: Station 1019+50 Cen SHE160A-031 SH 160 Passing Lanes 03/02/17 150.00 300.00 48.47 62.50 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 500.00 35.00 49.88 28.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,980.00 42.98 31.35 22.83 NHPPC120-026 US 85: I-76 to 168th 05/04/17 5.00 40.01 241.19 40.00 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 25.00 50.00 71.66 71.61 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 30.00 48.34 110.78 66.34 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 50.00 20.00 49.18 11.62 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 50.00 20.00 49.18 11.62 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,060.00 42.50 33.20 23.37 =============== 203-00060 Emb Matl (CIP) Cubic Yard ============================================= STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 40,557.00 19.00 25.15 31.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 62 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00060 Emb Matl (CIP) Cubic Yard ============================================= STM0243-089 Midpoint: Station 1019+50 Cen NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 149.00 75.00 77.20 65.00 IM025A-039 I-25 Critical Culvert at MP 1 02/09/17 3,215.00 25.00 37.59 44.45 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 9,787.00 26.00 45.40 38.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 20.00 100.00 176.02 116.58 SHE160A-031 SH 160 Passing Lanes 03/02/17 37,442.00 17.00 20.64 25.34 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 15,466.00 14.00 12.68 7.10 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 2,992.00 30.00 36.35 26.60 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 300.00 15.00 72.33 67.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 585.00 30.00 75.56 84.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 110,513.00 18.85 24.08 26.21 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 5,722.00 3.00 13.94 7.71 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 678.00 55.00 56.94 53.83 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 21,008.00 15.00 6.00 6.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 750.00 40.00 49.00 60.00 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 1,000.00 14.50 35.81 35.79 ER0361-115 US 36 Bridges 06/22/17 25,700.00 14.00 19.18 7.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 54,858.00 14.11 18.10 8.66 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 16.00 16.00 178.59 250.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 8,084.00 12.00 26.98 55.29 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 800.00 30.00 14.00 10.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 657.00 30.00 44.00 65.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 16,389.00 11.00 15.41 17.00 BRR400-354 Little-T Channel Work and SH SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 2,444.00 20.00 44.00 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 28,390.00 13.04 20.81 30.07 STA094A-034 Critical Culvert Project on S 10/05/17 1,962.00 18.00 21.51 30.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 6,125.00 20.00 21.33 13.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 5.00 100.00 276.67 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8,092.00 19.56 21.53 17.27 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 201,853.00 16.77 22.06 21.12 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 63 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00062 Emb Matl (CIP) (Spec) Cubic Yard ============================================= BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 78.00 50.00 94.50 130.00 ER0341-093 PR US 34 BIG THOMPSON CANYON 06/28/17 700.00 5.75 5.75 5.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 778.00 10.19 33.11 18.21 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 778.00 10.19 33.11 18.21 =============== 203-00066 Emb Matl (CIP) (R40) Cubic Yard ============================================= STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 62,478.00 25.00 22.83 13.02 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 62,478.00 25.00 22.83 13.02 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 8,453.00 13.50 25.70 26.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8,453.00 13.50 25.70 26.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 70,931.00 23.63 23.15 14.57 =============== 203-00100 Muck Excav Cubic Yard ============================================= NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1,581.00 20.00 35.20 45.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 200.00 40.00 41.57 60.42 NHPP 0701-230 Midpoint WB Bore 03/02/17 15.00 55.00 60.38 55.60 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 11.00 120.00 250.00 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,807.00 23.11 36.60 47.74 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 1,000.00 20.00 27.00 27.00 ER0361-115 US 36 Bridges 06/22/17 700.00 40.00 25.10 23.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,700.00 28.24 25.46 25.35 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 20.00 70.00 100.00 30.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 64 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00100 Muck Excav Cubic Yard ============================================= IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 100.00 50.00 84.79 180.00 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 1,002.00 25.00 27.00 38.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 580.00 30.00 32.56 42.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,702.00 28.70 33.14 47.61 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 250.00 50.00 31.50 28.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 200.00 40.00 40.00 35.00 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 11.00 200.00 167.06 85.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 461.00 49.24 41.17 32.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,670.00 28.45 33.10 39.74 =============== 203-00400 Rock Excav Cubic Yard ============================================= NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1,876.00 50.00 44.80 24.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,876.00 50.00 44.80 24.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 748.00 60.00 37.28 23.17 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 887.00 60.00 129.38 80.00 ER0361-115 US 36 Bridges 06/22/17 1,425.00 80.00 34.78 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,060.00 69.31 51.77 52.14 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 529.00 70.00 104.74 90.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 30.00 55.00 171.00 163.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 559.00 69.19 108.30 93.92 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,495.00 62.71 52.69 46.78 =============== 203-00440 Rock Excav (Spec) Cubic Yard ============================================= NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 551.00 120.00 188.00 105.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 65 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00440 Rock Excav (Spec) Cubic Yard ============================================= ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 1,537.00 190.00 190.00 190.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,088.00 171.53 188.72 167.57 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1,422.00 85.84 75.00 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,422.00 85.84 75.00 75.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,510.00 136.81 160.42 130.07 =============== 203-00500 Rock Fill Cubic Yard ============================================= ER0341-093 PR US 34 BIG THOMPSON CANYON 06/28/17 5,990.00 11.75 11.75 11.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,990.00 11.75 11.75 11.75 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 29.00 100.00 246.67 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 29.00 100.00 246.67 90.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,019.00 12.18 15.11 12.13 =============== 203-00510 Rock Fill (Spec) Cubic Yard ============================================= NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 615.00 75.00 42.30 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 615.00 75.00 42.30 4.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 615.00 75.00 42.30 4.00 =============== 203-00600 Stripping Cubic Yard ============================================= ER0361-115 US 36 Bridges 06/22/17 3,345.00 20.00 12.10 19.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,345.00 20.00 12.10 19.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,345.00 20.00 12.10 19.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 66 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01100 Proof Rolling Hour =================================================== STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 5.00 100.00 128.25 150.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 40.00 120.00 111.99 78.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 25.00 140.00 131.92 135.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 8.00 120.00 196.04 200.51 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 78.00 125.13 128.23 125.67 STA006A-057 SH 6 EAST OF STERLING 04/06/17 20.00 138.00 106.22 95.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20.00 138.00 106.22 95.00 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 20.00 120.00 109.00 110.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 100.00 114.40 100.00 100.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 4.00 125.00 120.75 78.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 124.00 115.65 107.43 100.90 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 222.00 120.99 118.97 107.43 =============== 203-01500 Blading Hour =================================================== NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 50.00 150.00 158.68 130.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 5.00 150.50 195.75 150.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 80.00 150.00 174.73 115.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 20.00 145.00 166.64 135.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 18.00 145.00 127.00 100.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 40.00 120.00 154.12 128.62 SHE160A-031 SH 160 Passing Lanes 03/02/17 60.00 120.00 166.26 125.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 20.00 125.00 142.33 120.00 STA2873-183 US 287 Repairs at LCR 17 03/09/17 10.00 200.00 206.33 185.00 ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 20.00 187.00 187.00 187.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 60.00 130.00 185.14 160.13 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 40.00 140.00 170.25 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 423.00 140.43 167.21 133.14 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 67 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01500 Blading Hour =================================================== STA006A-057 SH 6 EAST OF STERLING 04/06/17 200.00 135.00 162.34 145.00 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 20.00 150.00 124.31 152.92 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 300.00 50.00 143.46 140.90 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 160.00 134.00 155.00 100.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 10.00 150.00 90.00 90.00 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 55.00 150.00 181.43 181.33 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 10.00 150.00 175.60 125.00 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 15.00 150.00 197.80 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 770.00 103.82 148.35 135.39 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 40.00 150.00 149.00 175.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 20.00 125.00 112.67 95.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 100.00 150.00 146.41 169.98 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 100.00 175.82 190.00 190.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 70.00 145.00 135.71 102.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 330.00 155.25 144.20 157.69 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 40.00 150.00 180.10 140.00 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 40.00 150.00 155.77 193.87 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 40.00 145.00 138.03 90.00 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 100.00 130.00 161.96 170.71 BR3852-018 POA SCOUR US 385 STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 100.00 110.00 112.50 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 320.00 130.63 145.23 112.58 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,843.00 126.08 149.84 134.95 =============== 203-01510 Backhoe Hour =================================================== NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 40.00 150.00 166.00 135.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 30.00 145.00 128.40 62.00 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 20.00 150.00 191.00 145.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 68 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01510 Backhoe Hour =================================================== NHPP 0701-230 Midpoint WB Bore 03/02/17 10.00 150.00 179.20 132.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 120.00 130.00 140.40 75.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 10.00 135.00 107.33 80.00 ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 20.00 207.00 207.00 207.00 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 40.00 160.00 140.10 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 290.00 146.00 148.82 101.45 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 80.00 150.00 184.00 184.00 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 20.00 140.00 110.23 138.20 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 300.00 50.00 127.21 127.17 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 160.00 163.00 151.00 100.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 40.00 135.00 152.50 110.00 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 55.00 135.00 141.64 141.56 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 20.00 140.00 114.75 100.00 ER0361-115 US 36 Bridges 06/22/17 100.00 125.00 137.83 185.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 775.00 108.39 133.33 134.61 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 25.00 135.00 118.00 79.00 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 10.00 165.00 201.67 165.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 70.00 175.00 137.67 103.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 120.00 202.38 210.00 210.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 70.00 140.00 139.22 96.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 295.00 174.10 146.23 144.93 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 30.00 150.00 70.67 136.00 C133A-042 SH 133 McClure Pass Slip 11/16/17 10.00 120.00 163.06 160.00 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 10.00 135.00 115.85 75.00 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 100.00 130.00 154.86 134.04 BR3852-018 POA SCOUR US 385 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 150.00 133.67 145.54 132.23 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,510.00 130.96 138.71 130.02 =============== 203-01525 Backhoe (Spec) Hour =================================================== C0702-372 I-70 GWC Rockfall Fence Impro 10/12/17 40.00 200.00 132.50 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 40.00 200.00 132.50 140.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 200.00 132.50 140.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 69 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01550 Dozing Hour =================================================== ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 20.00 154.00 154.00 154.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 154.00 154.00 154.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 300.00 50.00 165.62 174.61 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 160.00 193.00 157.00 100.00 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 55.00 143.00 148.50 148.42 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 10.00 180.00 206.25 150.00 ER0361-115 US 36 Bridges 06/22/17 100.00 150.00 148.83 185.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 625.00 112.87 162.28 154.47 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 40.00 180.00 157.41 169.98 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 10.00 200.00 203.33 165.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 40.00 200.00 165.33 96.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 110.00 171.52 165.00 165.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 70.00 160.00 151.04 100.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 270.00 175.06 156.29 138.66 C133A-042 SH 133 McClure Pass Slip 11/16/17 10.00 140.00 209.13 250.00 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 100.00 160.00 180.35 115.00 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 100.00 165.00 177.65 153.57 BR3852-018 POA SCOUR US 385 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 210.00 161.43 180.65 139.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,125.00 137.59 164.24 147.93 =============== 203-01565 Hydraulic Excavator Hour =================================================== STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 20.00 170.00 160.06 200.18 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 16.00 175.00 149.98 119.94 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 20.00 200.00 176.00 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 56.00 182.14 165.40 159.33 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 70 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01565 Hydraulic Excavator Hour =================================================== NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 40.00 200.00 162.00 175.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 40.00 200.00 162.00 175.00 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 180.00 200.00 169.50 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 180.00 200.00 169.50 120.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 276.00 196.38 167.92 135.95 =============== 203-01580 Truck Hour =================================================== NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 40.00 125.00 105.74 108.69 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 40.00 125.00 105.74 108.69 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 125.00 105.74 108.69 =============== 203-01582 Truck (Dump) Hour =================================================== NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 40.00 125.00 130.44 135.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 10.00 104.00 107.81 83.28 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 20.00 150.00 134.00 150.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 10.00 120.00 107.33 80.00 ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 20.00 118.00 118.00 118.00 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 40.00 150.00 122.35 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 140.00 132.86 126.07 114.23 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 24.00 130.00 132.44 97.31 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 55.00 110.00 127.24 127.17 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 20.00 125.00 138.40 120.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 20.00 140.00 135.00 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 119.00 121.60 133.07 118.74 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 71 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01582 Truck (Dump) Hour =================================================== NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 40.00 115.00 115.00 120.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 100.00 109.37 135.00 135.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 140.00 110.98 121.67 130.71 C0702-372 I-70 GWC Rockfall Fence Impro 10/12/17 40.00 125.00 107.50 110.00 C133A-042 SH 133 McClure Pass Slip 11/16/17 10.00 100.00 128.13 135.00 NHPP006A-059 US 6 CLEAR CREEK CANYON SH 93 12/14/17 200.00 200.00 292.00 239.00 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 10.00 120.00 96.25 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 260.00 181.54 247.38 209.04 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 659.00 145.38 172.37 155.95 =============== 203-01590 Front End Loader (Rubber) Hour =================================================== NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 10.00 125.00 154.67 120.00 ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 20.00 159.00 159.00 159.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 30.00 147.67 156.40 146.00 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 90.00 130.00 143.55 143.47 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 10.00 160.00 133.75 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 100.00 133.00 141.77 139.12 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 40.00 150.00 130.00 125.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 100.00 150.19 160.00 160.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 140.00 150.14 140.00 150.00 C0702-372 I-70 GWC Rockfall Fence Impro 10/12/17 40.00 200.00 165.00 155.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 72 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01590 Front End Loader (Rubber) Hour =================================================== C133A-042 SH 133 McClure Pass Slip 11/16/17 10.00 120.00 165.63 175.00 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 140.00 165.00 145.04 110.00 NHPP006A-059 US 6 CLEAR CREEK CANYON SH 93 12/14/17 160.00 250.00 215.83 280.50 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 10.00 125.00 145.91 97.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 360.00 204.31 169.55 192.22 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 630.00 178.25 162.07 172.21 =============== 203-01594 Combination Loader Hour =================================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 60.00 125.00 148.91 57.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 40.00 120.00 117.27 135.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 40.00 125.00 131.84 115.52 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 38.00 150.00 85.20 62.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 20.00 110.00 154.35 118.42 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 40.00 120.00 155.00 110.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 120.00 130.00 114.40 110.00 BR0252-449 I-25 Woodmen NB 03/02/17 10.00 150.00 149.50 90.00 ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 20.00 110.00 110.00 110.00 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 10.00 150.00 131.95 100.00 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 40.00 125.00 151.00 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 438.00 127.40 126.90 108.22 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 160.00 120.00 125.40 100.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 30.00 130.00 128.65 120.95 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 50.00 105.00 125.29 125.22 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 15.00 160.00 120.40 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 255.00 120.59 125.31 107.41 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 40.00 120.00 98.00 95.00 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 10.00 125.00 130.00 125.00 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 40.00 154.00 137.00 118.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 94.00 115.00 102.00 71.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 100.00 105.01 110.00 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 284.00 118.03 107.26 96.63 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 73 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01594 Combination Loader Hour =================================================== STA094A-034 Critical Culvert Project on S 10/05/17 40.00 125.00 112.53 130.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 30.00 120.00 78.00 136.00 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 40.00 125.00 151.38 226.89 NHPP006A-059 US 6 CLEAR CREEK CANYON SH 93 12/14/17 40.00 300.00 196.93 180.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 150.00 170.67 133.96 170.58 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,127.00 129.26 124.54 113.56 =============== 203-01597 Potholing Hour =================================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 150.00 200.00 249.16 166.00 NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 160.00 250.00 178.99 157.98 NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 10.00 300.00 275.90 245.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 10.00 225.00 250.25 200.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 100.00 220.00 248.76 186.36 STM0243-089 Midpoint: Station 1019+50 Cen MTCER100-274 MTCE R1 FY 17 SH 119 Signing 01/26/17 40.00 250.00 163.75 150.00 NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 20.00 300.00 254.05 185.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 40.00 220.00 272.52 262.55 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 20.00 250.00 250.33 301.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 138.00 250.00 268.60 200.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 8.00 200.00 267.01 280.50 NHPP 0701-230 Midpoint WB Bore 03/02/17 20.00 300.00 304.75 225.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 40.00 225.00 218.40 205.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 40.00 300.00 300.43 268.80 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 120.00 200.00 227.14 200.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 100.00 200.00 296.71 265.36 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 10.00 250.00 313.45 175.00 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 40.00 215.00 233.20 200.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 60.00 200.00 218.33 155.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 40.00 280.00 271.14 265.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,166.00 230.23 246.02 200.42 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 200.00 200.00 192.00 192.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 30.00 215.00 190.06 170.00 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 60.00 450.00 252.10 256.29 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 40.00 208.00 211.59 210.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 74 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01597 Potholing Hour =================================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 100.00 100.00 207.59 250.00 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 30.00 230.00 215.86 224.30 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 80.00 300.00 376.67 420.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 8.00 250.00 289.24 142.73 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 100.00 200.00 300.00 300.00 STAR400-348 Region 4 Controller and Cabin 05/04/17 180.00 200.00 205.00 175.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 10.00 200.00 241.50 320.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 120.00 200.00 228.59 325.00 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 80.00 180.00 232.50 150.00 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 2.00 400.00 420.84 420.63 STA0703-437 I-70: 32ND TO 44TH 06/01/17 100.00 220.00 183.00 240.00 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 40.00 250.00 239.55 185.00 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 25.00 350.00 447.60 400.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 25.00 240.00 356.25 400.00 MTCE0253-259 I25 FROM MP 229.29 TO MP 244. 06/22/17 150.00 200.00 198.00 200.00 STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 250.00 170.00 155.60 168.00 ER0361-115 US 36 Bridges 06/22/17 100.00 225.00 217.97 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,730.00 210.18 215.68 230.46 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 40.00 250.00 312.00 250.00 ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 70.00 220.00 225.00 300.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 30.00 225.00 250.00 250.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 20.00 220.00 199.33 320.00 CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 120.00 225.00 197.50 245.00 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 250.00 170.00 161.99 160.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 10.00 235.00 226.82 226.64 IM0762-052 FIBER OPTICS AND ITS DEVICES 08/03/17 24.00 180.00 167.83 160.00 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 10.00 660.00 300.00 300.00 NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 20.00 250.00 237.50 300.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 80.00 275.00 250.00 250.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 80.00 200.00 223.48 200.00 BRR400-354 Little-T Channel Work and SH NHPP0821-108 SH 82 MP 45 OLVDS 09/07/17 16.00 350.00 180.57 1.70 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 80.00 225.00 246.20 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 850.00 218.73 206.50 213.45 STA094A-034 Critical Culvert Project on S 10/05/17 24.00 200.00 226.82 275.00 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 40.00 200.00 198.52 150.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 90.00 200.00 212.00 330.00 C133A-042 SH 133 McClure Pass Slip 11/16/17 10.00 300.00 260.34 250.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 75 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01597 Potholing Hour =================================================== NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 10.00 200.00 242.05 225.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 40.00 225.00 247.12 185.00 ITSSW01-831 ITS WEATHER STATION UPGRADES 11/30/17 40.00 150.00 170.75 200.00 ITSSW02-003 ITS FIBER INSTALLATIONS FOR H 11/30/17 100.00 250.00 125.25 180.00 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 25.00 300.00 314.93 284.67 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 100.00 300.00 264.69 270.00 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 20.00 230.00 276.37 197.10 BR3852-018 POA SCOUR US 385 STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 100.00 260.00 230.00 70.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 599.00 240.23 219.89 209.53 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,345.00 221.38 221.85 216.37 =============== 203-01598 Potholing (Spec) Each =================================================== ER0361-115 US 36 Bridges 06/22/17 1.00 15000.00 8662.50 25000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 15000.00 8662.50 25000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 15000.00 8662.50 25000.00 =============== 203-01620 Sweeping Hour =================================================== BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 20.00 130.00 135.91 73.66 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20.00 130.00 135.91 73.66 NHPP006A-059 US 6 CLEAR CREEK CANYON SH 93 12/14/17 10.00 200.00 361.50 593.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 200.00 361.50 593.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 153.33 159.25 246.94 =============== 203-01622 Sweeping (With Pickup Broom) Hour =================================================== NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 20.00 150.00 290.00 230.00 NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 100.00 150.00 145.00 140.00 NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 80.00 150.00 158.31 100.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 76 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01622 Sweeping (With Pickup Broom) Hour =================================================== STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 120.00 190.00 155.76 140.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 30.00 190.00 138.67 205.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 350.00 167.14 161.77 141.57 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 96.00 200.00 184.80 179.40 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 20.00 100.00 167.40 167.31 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 10.00 170.00 222.62 175.00 MTCE142A-002 SH 142 CHIPSEAL 06/22/17 20.00 25.00 225.00 225.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 146.00 160.27 189.82 183.69 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 30.00 150.00 242.00 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 30.00 150.00 242.00 200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 526.00 164.26 173.62 156.59 =============== 203-02300 Rock Scaler Hour =================================================== C0702-372 I-70 GWC Rockfall Fence Impro 10/12/17 96.00 120.00 232.50 115.00 NHPP006A-059 US 6 CLEAR CREEK CANYON SH 93 12/14/17 1,826.00 125.00 195.67 194.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,922.00 124.75 196.91 190.05 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,922.00 124.75 196.91 190.05 =============== 203-02324 Blast Vibration Monitoring LUMP SUM =============================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1.00 29290.80 45000.00 45000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 29290.80 45000.00 45000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 29290.80 45000.00 45000.00 =============== 203-02330 Laborer Hour =================================================== NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 180.00 45.00 76.00 60.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 77 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-02330 Laborer Hour =================================================== NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 10.00 60.00 66.24 70.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 60.00 46.30 60.50 50.00 NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 40.00 50.00 48.84 55.00 STA0931-032 SH 93 Erosion Correction 02/09/17 40.00 40.00 43.47 22.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 40.00 50.00 59.17 52.51 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 100.00 35.00 38.60 35.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 40.00 45.00 55.13 54.40 SHE160A-031 SH 160 Passing Lanes 03/02/17 60.00 60.00 55.98 43.75 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 20.00 60.00 57.60 50.00 NHPP 0701-230 Midpoint WB Bore 03/02/17 50.00 45.00 52.19 55.60 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 120.00 40.00 35.22 35.00 ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 20.00 61.00 61.00 61.00 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 90.00 50.00 59.90 60.00 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 20.00 42.00 53.85 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 890.00 45.83 51.75 48.86 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 80.00 50.00 50.40 50.40 NHPP0703-433 EJMT S Bore Barrier, Handrail 04/13/17 10.00 50.00 50.24 60.00 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 80.00 40.00 38.06 36.30 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 32.00 50.00 56.22 48.67 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 50.00 45.00 26.00 26.00 STAR100-255 R1 FY18 CRACK SEAL 05/11/17 5.00 42.00 49.00 80.00 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 20.00 50.50 42.97 40.00 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 20.00 55.00 52.20 50.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 40.00 45.00 51.00 50.00 ER0361-115 US 36 Bridges 06/22/17 20.00 45.00 38.57 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 357.00 46.41 44.12 43.12 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 40.00 50.00 46.60 35.00 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 10.00 50.00 50.33 46.00 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 80.00 39.60 58.00 50.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 180.00 42.99 65.00 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 310.00 43.25 55.81 56.65 C0702-372 I-70 GWC Rockfall Fence Impro 10/12/17 20.00 50.00 112.50 50.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 30.00 40.00 41.67 93.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 78 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-02330 Laborer Hour =================================================== NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 40.00 42.00 48.64 40.00 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 40.00 60.00 52.54 87.70 NHPP0702-351 I-70: HLT GARAGE DOOR REPLACE 12/08/17 50.00 37.48 44.56 44.56 NHPP006A-059 US 6 CLEAR CREEK CANYON SH 93 12/14/17 120.00 70.00 113.00 131.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 300.00 55.18 74.84 89.49 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,857.00 47.02 54.17 55.62 =============== 206-00000 Str Excav Cubic Yard ============================================= STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 29.00 25.00 58.63 50.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 3,152.00 33.00 16.92 15.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 975.00 35.00 41.50 50.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 87.00 40.00 37.20 17.00 SHE160A-031 SH 160 Passing Lanes 03/02/17 5.00 300.00 90.88 50.00 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 6.00 125.00 149.80 75.00 ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 1,608.00 55.00 55.00 55.00 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 96.00 16.00 53.25 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,958.00 39.37 29.90 38.41 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1,490.00 20.00 19.70 13.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 152.00 35.00 43.58 19.75 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 4,316.00 15.00 12.00 12.00 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 41.00 150.00 211.80 100.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 639.00 30.00 84.88 80.00 ER0361-115 US 36 Bridges 06/22/17 4,389.00 15.00 22.67 24.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 11,027.00 17.32 24.76 21.29 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 4,125.00 22.00 22.25 17.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 774.00 30.00 37.33 30.00 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 27.00 80.00 264.67 25.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 2,472.00 20.00 14.29 18.13 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 74.00 45.00 243.00 150.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 353.00 60.00 42.67 67.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 72.00 60.33 100.00 100.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 741.00 35.00 19.89 15.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 79 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00000 Str Excav Cubic Yard ============================================= BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8,638.00 25.51 19.77 22.22 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 220.00 25.00 20.67 27.00 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 120.00 25.00 52.14 32.55 BR3852-018 POA SCOUR US 385 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 340.00 25.00 38.29 28.96 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25,963.00 25.21 23.34 24.80 =============== 206-00010 Str Excav (Spec) Cubic Yard ============================================= NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 1,046.00 40.00 49.89 50.00 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 1,559.00 40.00 48.40 52.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,605.00 40.00 49.12 51.20 ER0361-115 US 36 Bridges 06/22/17 11,003.00 27.00 12.12 19.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 11,003.00 27.00 12.12 19.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13,608.00 29.49 19.02 25.16 =============== 206-00050 Str Bkfl (Spec) Cubic Yard ============================================= NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 1,666.00 40.00 77.00 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,666.00 40.00 77.00 50.00 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 41.00 350.00 319.20 80.00 ER0361-115 US 36 Bridges 06/22/17 3,345.00 65.00 16.99 24.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,386.00 68.45 20.04 24.68 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,052.00 59.07 36.63 33.03 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 80 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00060 Str Bkfl (Spec) (Flow-Fill) Cubic Yard ============================================= STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 33.00 0.99 249.38 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 33.00 0.99 249.38 140.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 33.00 0.99 249.38 140.00 =============== 206-00065 Str Bkfl (Flow-Fill) Cubic Yard ============================================= NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 10.00 275.00 340.53 200.00 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 338.00 210.00 289.00 160.00 SHE160A-031 SH 160 Passing Lanes 03/02/17 9.00 180.00 243.00 200.00 ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 816.00 328.00 328.00 328.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 10.00 200.00 408.28 499.37 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 276.00 155.00 331.80 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,459.00 265.78 316.74 273.83 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 6.00 1000.00 466.50 424.51 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 15.00 200.00 419.07 336.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 1,403.00 100.00 105.00 105.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,424.00 104.85 125.10 108.78 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 104.00 345.19 280.00 280.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 32.00 300.00 196.68 180.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 136.00 334.56 215.68 256.47 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 75.00 175.00 222.00 200.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 6.00 250.00 715.70 750.00 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 30.00 250.00 382.41 207.03 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 164.00 200.00 275.16 359.12 BR3852-018 POA SCOUR US 385 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 275.00 199.73 278.19 307.66 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,294.00 193.53 259.99 204.59 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 81 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00100 Str Bkfl (CL 1) Cubic Yard ============================================= STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 8.00 68.75 90.00 50.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 408.00 50.00 53.64 45.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 774.00 60.00 69.05 55.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 94.00 60.00 69.80 35.00 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 2.00 100.00 315.80 90.00 ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 108.00 84.00 84.00 84.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,394.00 59.04 66.79 54.36 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 2,139.00 35.00 38.00 35.55 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 90.00 70.00 107.22 76.67 ER0361-115 US 36 Bridges 06/22/17 1,551.00 50.00 47.97 53.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,780.00 41.99 41.16 43.69 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 1,629.00 35.00 65.70 50.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 415.00 50.00 61.09 57.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 1,290.00 45.00 62.61 58.93 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 30.00 85.00 281.50 335.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 311.00 32.00 74.33 51.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 251.00 87.71 250.00 250.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 1,034.00 55.00 48.97 40.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,960.00 45.81 61.05 62.73 STA094A-034 Critical Culvert Project on S 10/05/17 1,625.00 30.00 33.92 40.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 320.00 50.00 27.75 23.00 C133A-042 SH 133 McClure Pass Slip 11/16/17 575.00 90.00 109.30 70.00 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 120.00 55.00 75.41 71.68 BR3852-018 POA SCOUR US 385 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,640.00 46.63 55.05 45.91 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12,774.00 46.29 53.34 52.68 =============== 206-00200 Str Bkfl (CL 2) Cubic Yard ============================================= STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 132.00 40.00 37.98 30.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 82 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00200 Str Bkfl (CL 2) Cubic Yard ============================================= STM0243-089 Midpoint: Station 1019+50 Cen ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 279.00 55.00 55.00 55.00 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 72.00 32.00 61.30 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 483.00 47.47 49.92 47.59 ER0361-115 US 36 Bridges 06/22/17 108.00 35.00 27.59 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 108.00 35.00 27.59 18.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 136.00 50.00 44.43 58.93 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 14.00 37.45 150.00 150.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 386.00 55.00 18.54 15.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 536.00 53.27 26.44 29.67 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 444.00 30.00 38.36 28.58 BR3852-018 POA SCOUR US 385 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 444.00 30.00 38.36 28.58 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,571.00 43.66 32.29 33.48 =============== 206-00360 Mechanical Reinforcement of Soil Cubic Yard ============================================= STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 729.00 25.00 36.58 19.46 ER0361-115 US 36 Bridges 06/22/17 1,286.00 20.00 17.97 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,015.00 21.81 27.86 19.80 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 658.00 25.00 49.30 30.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 1,290.00 20.00 21.74 36.26 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 237.00 32.32 40.00 40.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 83 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00360 Mechanical Reinforcement of Soil Cubic Yard ============================================= ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 1,034.00 20.00 20.68 20.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,219.00 21.93 24.36 30.03 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,234.00 21.88 25.55 26.10 =============== 206-00510 Filter Matl (CL A) Cubic Yard ============================================= STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 1,330.00 80.00 63.40 52.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 137.00 75.00 150.67 132.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 106.00 120.00 78.50 50.52 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,573.00 82.26 71.24 63.90 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 63.00 100.00 80.36 59.43 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 784.00 60.00 138.00 150.00 ER0361-115 US 36 Bridges 06/22/17 1,652.00 60.00 72.56 78.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,499.00 61.01 87.85 100.12 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 1,200.00 65.00 80.00 110.00 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 10.00 96.00 346.50 525.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 412.00 80.00 71.77 60.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,622.00 69.00 76.08 99.86 C133A-042 SH 133 McClure Pass Slip 11/16/17 32.00 120.00 152.41 32.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 647.00 95.00 61.30 59.89 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 679.00 96.18 71.91 58.58 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,373.00 72.04 80.32 89.34 =============== 206-00520 Filter Matl (CL B) Cubic Yard ============================================= NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 8.00 120.00 111.00 70.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 84 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00520 Filter Matl (CL B) Cubic Yard ============================================= STE 0702-357 I-70 West Vail Pass Basin 03/23/17 25.00 70.00 113.35 106.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 33.00 82.12 112.78 97.65 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 306.00 68.00 95.67 88.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 306.00 68.00 95.67 88.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 1.00 200.00 313.67 240.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 200.00 313.67 240.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 340.00 69.76 98.87 89.38 =============== 206-01750 Shoring LUMP SUM =============================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1.00 10000.00 10440.00 10000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 10000.00 10440.00 10000.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 1.00 20000.00 44597.37 56292.12 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 1.00 45000.00 37809.20 3000.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 1.00 22000.00 14762.50 10000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 29000.00 31824.01 23097.37 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 1.00 100000.00 101000.00 125000.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 1.00 110000.00 67899.38 25000.00 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 1.00 10000.00 68433.33 1300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 73333.33 83090.74 50433.33 C133A-042 SH 133 McClure Pass Slip 11/16/17 1.00 200000.00 240469.88 70000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 200000.00 240469.88 70000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 64625.00 90884.59 37574.02 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 85 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-01781 Shoring (A 1) LUMP SUM =============================================== ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 1.00 155750.00 155750.00 155750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 155750.00 155750.00 155750.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1.00 10000.00 22953.66 10725.00 ER0361-115 US 36 Bridges 06/22/17 1.00 25000.00 50210.00 15200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 17500.00 32039.11 12962.50 STA094A-034 Critical Culvert Project on S 10/05/17 1.00 10000.00 13316.60 13000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 10000.00 13316.60 13000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 50187.50 31756.54 48668.75 =============== 206-01782 Shoring (A 2) LUMP SUM =============================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1.00 10000.00 21842.16 10725.00 ER0361-115 US 36 Bridges 06/22/17 1.00 35000.00 28843.33 13500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 22500.00 24175.88 12112.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 22500.00 24175.88 12112.50 =============== 206-01783 Shoring (A 3) LUMP SUM =============================================== ER0361-115 US 36 Bridges 06/22/17 1.00 25000.00 24689.67 6318.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 25000.00 24689.67 6318.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 25000.00 24689.67 6318.00 =============== 207-00205 Topsoil Cubic Yard ============================================= NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 1,786.00 20.00 52.00 59.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 86 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 207-00205 Topsoil Cubic Yard ============================================= STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 12,996.00 12.00 10.54 5.00 STM0243-089 Midpoint: Station 1019+50 Cen IM025A-039 I-25 Critical Culvert at MP 1 02/09/17 203.00 20.00 41.92 49.23 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 215.00 25.00 37.80 10.00 SHE160A-031 SH 160 Passing Lanes 03/02/17 5,063.00 12.00 12.14 15.00 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 561.00 50.00 69.00 95.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 411.00 12.00 69.89 53.07 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 60.00 16.00 51.50 60.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 35.00 11.00 60.00 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 21,330.00 13.89 16.15 20.80 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 52.00 10.00 121.00 121.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 7,744.00 10.00 9.51 8.24 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 8,070.00 12.50 10.02 4.12 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 83.00 55.00 93.67 100.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 250.00 15.00 18.61 9.82 STAR400-348 Region 4 Controller and Cabin 05/04/17 4.00 150.00 97.50 125.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 2,100.00 15.00 6.31 1.25 NHPPC120-026 US 85: I-76 to 168th 05/04/17 11,610.00 10.00 32.55 20.00 AQC088A-035 Traffic Signal/Fiber Optic In 05/18/17 5.00 100.00 64.47 100.00 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 1,650.00 13.00 47.48 47.45 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 110.00 20.00 23.40 14.00 ER0361-115 US 36 Bridges 06/22/17 6,450.00 13.00 16.84 24.00 ER0341-093 PR US 34 BIG THOMPSON CANYON 06/28/17 940.00 68.00 68.00 68.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 39,068.00 12.98 15.40 16.60 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 1,076.00 30.00 10.85 5.50 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 241.00 14.00 60.00 45.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 115.00 30.00 60.00 72.00 AQCR100-258 CDOT TSSIP 2016 SIG UPGRADE F 09/21/17 5.00 75.00 102.67 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,437.00 27.47 19.19 17.51 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 654.00 15.00 24.50 26.50 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 637.00 20.00 28.25 27.74 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,291.00 17.47 26.35 27.11 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 63,126.00 13.71 15.83 17.96 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 87 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 207-00210 Stockpile Topsoil Cubic Yard ============================================= SHE160A-031 SH 160 Passing Lanes 03/02/17 815.00 7.00 9.18 10.00 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 60.00 9.00 26.01 26.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 875.00 7.14 9.92 11.10 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 250.00 15.00 16.07 12.22 STAR400-348 Region 4 Controller and Cabin 05/04/17 109.00 25.00 110.00 150.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 2,100.00 10.00 4.19 1.25 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 110.00 15.00 10.51 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,569.00 11.34 7.76 8.88 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 1,076.00 15.00 7.85 3.50 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 41.00 7.00 36.33 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,117.00 14.71 8.49 5.02 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,561.00 11.36 8.60 8.36 =============== 207-00305 Wetland Topsoil Cubic Yard ============================================= NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 95.00 25.00 52.60 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 95.00 25.00 52.60 40.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 13.00 30.00 36.90 42.71 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 13.00 30.00 36.90 42.71 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 12.00 30.00 128.33 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.00 30.00 128.33 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 120.00 26.04 56.44 41.29 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 88 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 207-00310 Stockpile Wetland Topsoil Cubic Yard ============================================= STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 13.00 45.00 33.57 42.71 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 13.00 45.00 33.57 42.71 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 12.00 30.00 78.33 50.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 11.00 20.00 181.00 178.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 23.00 25.22 127.43 111.22 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 36.00 32.36 93.54 86.48 =============== 207-00405 Topsoil (Spec) Cubic Yard ============================================= ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 69,446.00 40.84 48.00 48.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 69,446.00 40.84 48.00 48.00 CC0341-100 US 34 BIG THOMPSON CANYON MOO 12/11/17 1,722.00 20.89 34.67 34.67 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,722.00 20.89 34.67 34.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 71,168.00 40.36 47.68 47.68 =============== 208-00001 Silt Dike Lin Foot =============================================== STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 615.00 10.00 10.16 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 615.00 10.00 10.16 9.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 615.00 10.00 10.16 9.00 =============== 208-00002 Erosion Log Type 1 (12 In) Lin Foot =============================================== NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 50.00 8.00 4.75 4.50 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 89 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00002 Erosion Log Type 1 (12 In) Lin Foot =============================================== NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 2,240.00 4.00 5.00 4.99 NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 1,500.00 5.00 6.06 8.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 2,000.00 4.50 3.64 3.25 STM0243-089 Midpoint: Station 1019+50 Cen STA0931-032 SH 93 Erosion Correction 02/09/17 530.00 5.00 5.33 3.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 1,200.00 5.00 4.85 3.52 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 6,900.00 5.00 4.36 3.77 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 4,610.00 5.00 5.53 4.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 1,000.00 3.50 4.12 3.77 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 30.00 5.00 6.56 6.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 1,170.00 5.00 3.90 4.10 BR0252-449 I-25 Woodmen NB 03/02/17 330.00 5.00 7.50 6.00 STA2873-183 US 287 Repairs at LCR 17 03/09/17 3,000.00 6.50 6.83 2.50 ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 250.00 9.00 9.00 9.00 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 140.00 15.00 9.13 12.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 80.00 4.50 17.00 15.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 2,000.00 9.00 7.36 6.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 27,030.00 5.38 5.32 4.38 STA006A-057 SH 6 EAST OF STERLING 04/06/17 300.00 5.00 5.38 5.50 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 200.00 4.00 5.96 4.88 NHPP0703-433 EJMT S Bore Barrier, Handrail 04/13/17 300.00 10.00 7.84 6.00 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 5,000.00 5.00 3.49 3.15 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 60.00 25.00 21.00 12.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 134.00 5.00 5.53 5.09 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 1,000.00 5.00 4.60 4.60 STAR400-348 Region 4 Controller and Cabin 05/04/17 540.00 7.00 21.50 8.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 1,000.00 5.00 7.21 8.00 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 100.00 7.00 10.50 8.00 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 216.00 4.50 4.17 3.20 STA0703-437 I-70: 32ND TO 44TH 06/01/17 100.00 5.00 14.32 16.00 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 140.00 5.00 9.68 20.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 1,000.00 8.00 9.41 20.00 ER0361-115 US 36 Bridges 06/22/17 8,057.00 5.00 4.17 3.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 18,147.00 5.37 4.80 5.10 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 500.00 5.00 6.10 5.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 30.00 8.00 11.50 11.50 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 1,600.00 5.00 4.58 4.50 CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 100.00 5.00 10.19 15.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 90 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00002 Erosion Log Type 1 (12 In) Lin Foot =============================================== SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 800.00 10.00 6.17 5.50 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 2,000.00 8.00 4.34 4.50 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 5,639.00 5.25 4.04 4.25 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 660.00 5.00 6.00 5.50 IM0762-052 FIBER OPTICS AND ITS DEVICES 08/03/17 700.00 5.00 5.15 4.50 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 1,000.00 6.60 12.00 13.50 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 1,509.00 4.82 6.58 6.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 2,500.00 13.15 13.00 13.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 9,497.00 6.00 4.23 4.00 BRR400-354 Little-T Channel Work and SH NHPP0821-108 SH 82 MP 45 OLVDS 09/07/17 400.00 10.00 8.67 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 26,935.00 6.66 4.51 5.60 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 200.00 5.00 7.57 5.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 3,820.00 5.00 3.23 4.40 C133A-042 SH 133 McClure Pass Slip 11/16/17 520.00 8.00 6.33 6.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 12,493.00 5.00 5.29 4.75 ITSSW01-831 ITS WEATHER STATION UPGRADES 11/30/17 300.00 5.00 16.78 5.00 ITSSW02-003 ITS FIBER INSTALLATIONS FOR H 11/30/17 800.00 5.00 5.94 6.50 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 100.00 6.00 9.47 10.35 CC0341-100 US 34 BIG THOMPSON CANYON MOO 12/11/17 2,090.00 8.51 7.00 7.00 NHPP006A-059 US 6 CLEAR CREEK CANYON SH 93 12/14/17 600.00 8.00 13.80 9.40 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 4,810.00 5.00 4.71 3.62 BR3852-018 POA SCOUR US 385 STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 90.00 5.00 8.29 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 25,823.00 5.42 5.34 4.91 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 97,935.00 5.74 4.90 5.00 =============== 208-00004 Silt Berm Lin Foot =============================================== STA0931-032 SH 93 Erosion Correction 02/09/17 120.00 13.00 16.08 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 120.00 13.00 16.08 10.00 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 615.00 6.00 10.16 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 615.00 6.00 10.16 9.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 735.00 7.14 12.34 9.16 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 91 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00007 Erosion Log Type 2 (8 In) Lin Foot =============================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1,300.00 10.00 5.16 3.03 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 216.00 6.00 6.00 5.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,516.00 9.43 5.18 3.37 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,516.00 9.43 5.18 3.37 =============== 208-00008 Erosion Log Type 2 (12 In) Lin Foot =============================================== SHE160A-031 SH 160 Passing Lanes 03/02/17 16,045.00 4.00 5.07 5.97 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16,045.00 4.00 5.07 5.97 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 130.00 8.00 8.81 6.00 STA0061-091 SH 6 CHIPSEAL NEAR FLEMING 06/15/17 100.00 9.00 9.53 3.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 230.00 8.43 9.04 4.96 ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 300.00 8.00 7.50 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 300.00 8.00 7.50 10.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 80.00 9.00 6.33 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 80.00 9.00 6.33 5.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16,655.00 4.16 5.12 6.02 =============== 208-00009 Erosion Log Type 2 (18 In) Lin Foot =============================================== NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 225.00 8.00 8.94 8.00 IM025A-039 I-25 Critical Culvert at MP 1 02/09/17 730.00 7.50 8.45 7.51 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 955.00 7.62 8.57 7.63 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 92 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00009 Erosion Log Type 2 (18 In) Lin Foot =============================================== STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 216.00 6.75 12.55 11.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 216.00 6.75 12.55 11.40 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 390.00 10.00 14.50 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 390.00 10.00 14.50 12.00 STA094A-034 Critical Culvert Project on S 10/05/17 240.00 6.00 12.53 4.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 40.00 10.00 10.00 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 280.00 6.57 12.37 4.43 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,841.00 7.86 10.10 8.51 =============== 208-00011 Erosion Bales (Weed Free) Each =================================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 40.00 23.00 19.82 16.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 40.00 15.00 23.34 23.18 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 193.00 24.00 29.20 26.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 273.00 22.53 27.55 24.76 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 40.00 20.00 28.50 30.00 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 13.00 17.00 23.61 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 53.00 19.26 27.82 27.06 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 326.00 22.00 27.59 25.16 =============== 208-00012 Erosion Log Type 1 (9 In) Lin Foot =============================================== STA0362-035 US 36: Strasburg to Byers 03/23/17 350.00 10.00 14.38 6.49 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 350.00 10.00 14.38 6.49 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 93 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00012 Erosion Log Type 1 (9 In) Lin Foot =============================================== STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 2,080.00 6.00 5.32 3.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,080.00 6.00 5.32 3.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,430.00 6.58 6.15 3.59 =============== 208-00013 Erosion Log Type 1 (20 In) Lin Foot =============================================== STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 2,900.00 8.00 7.06 10.00 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 1,465.00 10.00 8.61 5.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,365.00 8.67 7.66 8.42 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 45.00 8.00 9.71 10.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 45.00 8.00 9.71 10.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,410.00 8.66 7.72 8.44 =============== 208-00015 Sand Bag Each =================================================== STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 50.00 22.00 6.08 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 50.00 22.00 6.08 5.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 22.00 6.08 5.00 =============== 208-00019 Silt Fence (Reinforced)(Special) Lin Foot =============================================== ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 1,020.00 60.00 60.00 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,020.00 60.00 60.00 60.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 237.00 67.89 65.00 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 237.00 67.89 65.00 65.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,257.00 61.49 60.94 60.94 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 94 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00020 Silt Fence Lin Foot =============================================== NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 500.00 2.00 2.01 1.75 NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 1,955.00 3.00 2.60 2.20 NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 250.00 3.00 3.91 5.75 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 40,000.00 1.50 1.24 1.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 6,900.00 2.00 2.72 3.07 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 1,200.00 2.00 2.28 1.87 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 650.00 5.00 3.11 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 51,455.00 1.69 1.52 1.65 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 200.00 2.00 2.42 2.10 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 6,900.00 2.00 1.63 1.38 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 5,000.00 1.40 1.22 1.05 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 124.00 20.00 15.00 4.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 100.00 5.00 2.65 2.36 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 1,230.00 1.25 1.48 1.10 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 520.00 2.50 2.56 2.50 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 300.00 5.00 6.56 15.00 MTCE142A-002 SH 142 CHIPSEAL 06/22/17 500.00 2.00 1.00 1.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 14,874.00 1.98 1.67 1.59 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 3,000.00 2.00 2.64 2.00 ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 300.00 1.50 9.00 13.00 CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 50.00 2.00 6.19 7.00 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 2,000.00 4.00 5.60 3.50 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 250.00 4.00 7.60 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5,600.00 2.78 4.02 3.44 STA094A-034 Critical Culvert Project on S 10/05/17 325.00 2.00 3.19 1.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 12,493.00 1.25 2.36 2.00 CC0341-100 US 34 BIG THOMPSON CANYON MOO 12/11/17 1,262.00 5.32 5.00 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 14,080.00 1.63 2.44 2.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 86,009.00 1.80 1.90 1.92 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 95 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00021 Silt Fence (Reinf) Lin Foot =============================================== NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 900.00 10.00 4.46 2.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 900.00 10.00 4.46 2.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 900.00 10.00 4.46 2.50 =============== 208-00023 Erosion Log (Type 3)(12 In) Lin Foot =============================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 67,202.00 5.90 7.00 7.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 6,358.00 7.00 5.14 4.50 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 73,560.00 6.00 6.05 6.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 73,560.00 6.00 6.05 6.78 =============== 208-00024 Erosion Log (Type 3)(20 In) Lin Foot =============================================== BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 1,410.00 10.00 9.38 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,410.00 10.00 9.38 9.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,410.00 10.00 9.38 9.00 =============== 208-00026 Coir Roll Lin Foot =============================================== ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 512.00 15.00 14.94 15.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 512.00 15.00 14.94 15.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 512.00 15.00 14.94 15.00 =============== 208-00033 Sediment Trap Each =================================================== SHE160A-031 SH 160 Passing Lanes 03/02/17 2.00 200.00 1744.94 2875.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 200.00 1744.94 2875.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 200.00 1744.94 2875.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 96 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00035 Aggregate Bag Lin Foot =============================================== NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 150.00 8.00 25.00 30.00 NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 80.00 15.00 6.84 7.75 NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 564.00 7.50 10.54 7.60 NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 760.00 2.00 6.96 6.92 NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 200.00 5.00 7.68 7.65 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 1,570.00 8.00 6.68 8.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 100.00 6.50 8.44 8.50 STM0243-089 Midpoint: Station 1019+50 Cen MTCER100-274 MTCE R1 FY 17 SH 119 Signing 01/26/17 200.00 7.00 10.25 10.00 STA0931-032 SH 93 Erosion Correction 02/09/17 300.00 10.00 7.75 5.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 200.00 9.00 7.32 5.36 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 120.00 10.00 9.55 6.15 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 224.00 12.00 8.89 8.25 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 100.00 8.00 6.66 6.79 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 213.00 10.00 10.17 15.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 174.00 7.50 8.90 17.75 BR0252-449 I-25 Woodmen NB 03/02/17 100.00 10.00 12.75 7.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 200.00 9.00 8.13 10.08 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 200.00 8.00 14.50 19.30 ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 120.00 7.00 7.00 7.00 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 500.00 8.00 6.98 6.20 STA0362-035 US 36: Strasburg to Byers 03/23/17 20.00 8.00 23.50 26.53 MTCE2873-191 R4 FY 17 Stencils #1 03/23/17 200.00 10.00 19.17 7.50 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 120.00 10.00 9.87 5.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 62.00 8.00 20.67 21.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 30.00 71.00 29.54 8.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6,507.00 7.98 8.94 8.98 STA006A-057 SH 6 EAST OF STERLING 04/06/17 100.00 7.51 8.41 5.25 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 700.00 10.00 10.90 10.90 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 70.00 10.00 17.12 15.60 NHPP0703-433 EJMT S Bore Barrier, Handrail 04/13/17 500.00 10.00 12.08 7.00 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 300.00 8.00 13.15 13.50 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 400.00 10.00 6.73 5.52 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 150.00 7.50 5.55 5.25 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 540.00 25.00 22.33 14.00 NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 125.00 11.00 18.13 9.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 100.00 10.00 4.30 4.30 STAR400-348 Region 4 Controller and Cabin 05/04/17 204.00 10.00 23.50 6.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 300.00 8.00 7.63 6.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 500.00 10.00 8.19 4.00 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 200.00 15.00 12.50 7.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 97 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00035 Aggregate Bag Lin Foot =============================================== AQC088A-035 Traffic Signal/Fiber Optic In 05/18/17 540.00 11.00 5.76 9.25 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 25.00 9.00 6.76 4.80 STA0703-437 I-70: 32ND TO 44TH 06/01/17 100.00 9.00 25.39 27.00 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 36.00 20.00 15.55 27.00 STA0061-091 SH 6 CHIPSEAL NEAR FLEMING 06/15/17 100.00 7.60 10.33 3.00 MTCE141A-048 SH 141A WHITEWATER IN MESA CO 06/15/17 400.00 10.00 3.00 3.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 100.00 10.00 15.43 25.00 STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 80.00 10.00 9.54 6.70 ER0361-115 US 36 Bridges 06/22/17 56.00 8.00 9.69 10.00 ER0341-093 PR US 34 BIG THOMPSON CANYON 06/28/17 375.00 12.00 12.00 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6,001.00 11.43 10.82 8.95 ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 200.00 8.00 7.50 10.00 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 700.00 8.00 7.80 7.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 100.00 10.00 12.00 12.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 200.00 10.00 5.00 3.00 CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 150.00 10.00 14.27 22.00 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 30.00 7.00 9.83 10.50 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 500.00 10.00 6.63 7.50 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 500.00 8.00 6.74 7.37 IM0762-052 FIBER OPTICS AND ITS DEVICES 08/03/17 700.00 10.00 7.28 7.50 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 1,000.00 13.20 9.63 7.85 MTCE131A-039 SH 131 MP 0.053-68.721 IN EAG 08/17/17 400.00 10.00 7.33 13.00 NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 12.00 8.00 32.50 40.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 9,060.00 10.88 12.00 12.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 421.00 7.50 6.93 5.00 BRR400-354 Little-T Channel Work and SH NHPP0821-108 SH 82 MP 45 OLVDS 09/07/17 540.00 12.00 13.02 6.05 AQCR100-258 CDOT TSSIP 2016 SIG UPGRADE F 09/21/17 16.00 12.00 18.67 15.00 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 648.00 9.00 12.00 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 15,177.00 10.51 9.09 10.50 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 100.00 8.00 13.02 5.00 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 200.00 12.00 19.00 8.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 254.00 9.00 2.97 3.40 C133A-042 SH 133 McClure Pass Slip 11/16/17 200.00 10.00 8.17 8.00 STRR300-228 SH 13 R3 VARIOUS CHIP SEALS 11/30/17 400.00 10.00 6.75 5.00 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 500.00 20.00 6.58 6.90 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 512.00 8.00 10.00 10.00 ITSSW01-831 ITS WEATHER STATION UPGRADES 11/30/17 100.00 10.00 22.65 9.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 98 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00035 Aggregate Bag Lin Foot =============================================== ITSSW02-003 ITS FIBER INSTALLATIONS FOR H 11/30/17 232.00 8.00 6.75 6.00 MTCE092A-027 MTCE R3 FY18 SH 92 STR I-06-A 12/07/17 50.00 8.00 5.83 3.00 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 100.00 9.00 10.24 20.70 NHPP006A-059 US 6 CLEAR CREEK CANYON SH 93 12/14/17 600.00 12.00 18.17 15.50 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 200.00 5.00 8.69 5.00 STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 300.00 10.00 7.33 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,748.00 10.92 9.58 8.31 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 31,433.00 10.21 9.51 9.63 =============== 208-00036 Aggregate Bag (Special) Lin Foot =============================================== ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 200.00 15.00 15.00 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 200.00 15.00 15.00 15.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 43,695.00 13.73 15.00 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 43,695.00 13.73 15.00 15.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 43,895.00 13.74 15.00 15.00 =============== 208-00041 Rock Check Dam Each =================================================== NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 20.00 800.00 130.15 250.00 STA0931-032 SH 93 Erosion Correction 02/09/17 49.00 750.00 785.00 670.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 2.00 500.00 385.60 108.00 ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 4.00 1050.00 1050.00 1050.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 75.00 772.67 701.30 563.28 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 10.00 200.00 711.40 750.00 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 10.00 75.00 669.71 669.31 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 1.00 500.00 1297.60 1500.00 ER0361-115 US 36 Bridges 06/22/17 5.00 450.00 1018.33 1550.00 ER0341-093 PR US 34 BIG THOMPSON CANYON 06/28/17 5.00 2303.00 2303.00 2303.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 31.00 548.87 886.52 1127.68 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 99 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00041 Rock Check Dam Each =================================================== ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 1.00 3500.00 1216.67 750.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 330.00 545.98 700.00 700.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 3.00 750.00 1619.34 542.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 334.00 556.66 787.13 698.73 CC0341-100 US 34 BIG THOMPSON CANYON MOO 12/11/17 1.00 6318.00 3850.00 3850.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 6318.00 3850.00 3850.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 441.00 605.91 767.89 712.99 =============== 208-00045 Conc Washout Str Each =================================================== NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 1.00 1500.00 948.75 950.00 NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 4.00 1500.00 2137.70 966.00 NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 3.00 1000.00 1036.50 973.00 NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 2.00 2000.00 2524.08 3000.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 4.00 1000.00 1639.14 800.00 STM0243-089 Midpoint: Station 1019+50 Cen MTCER100-274 MTCE R1 FY 17 SH 119 Signing 01/26/17 4.00 1100.00 1000.00 500.00 NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 1.00 2000.00 1802.58 2000.00 IM025A-039 I-25 Critical Culvert at MP 1 02/09/17 1.00 1500.00 1453.91 1760.90 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 1.00 850.00 5479.87 5034.62 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 3.00 2000.00 903.33 1480.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 2.00 700.00 1156.00 900.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 1.00 800.00 1665.18 935.35 SHE160A-031 SH 160 Passing Lanes 03/02/17 2.00 1320.00 2130.46 1000.00 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 1.00 4400.00 1360.00 800.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 2.00 1200.00 1104.00 1300.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 2.00 1500.00 2006.67 1120.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 2.00 1117.61 1804.93 1700.00 ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 1.00 59200.00 59200.00 59200.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 1.00 1500.00 4253.49 1140.73 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 3.00 1500.00 743.33 1200.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 1.00 2050.00 1598.75 1771.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 42.00 2794.65 1994.54 2751.39 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 100 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00045 Conc Washout Str Each =================================================== STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 6.00 2000.00 884.14 802.43 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 4.00 1500.00 1654.73 736.14 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 4.00 1250.00 1352.00 750.00 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 5.00 4000.00 2951.67 1200.00 NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 2.00 1500.00 1662.50 1500.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 1.00 1650.00 1625.92 1047.75 NHPPC120-026 US 85: I-76 to 168th 05/04/17 4.00 1500.00 1558.03 1400.00 AQC088A-035 Traffic Signal/Fiber Optic In 05/18/17 1.00 2000.00 291.00 400.00 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 1.00 799.99 895.51 894.94 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 1.00 2000.00 2280.00 2000.00 MTCE0253-259 I25 FROM MP 229.29 TO MP 244. 06/22/17 1.00 1400.00 1000.00 500.00 STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 2.00 1000.00 708.80 262.00 ER0361-115 US 36 Bridges 06/22/17 8.00 1500.00 1088.33 850.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 40.00 1846.25 1437.75 938.15 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 2.00 2000.00 1540.00 1000.00 ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 10.00 1200.00 553.50 607.00 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 1.00 2500.00 2433.33 1000.00 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 4.00 1600.00 493.50 400.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 1.00 1250.00 2329.59 1699.83 IM0762-052 FIBER OPTICS AND ITS DEVICES 08/03/17 2.00 1090.00 652.00 500.00 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 3.00 6050.00 897.00 450.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 1.00 1200.00 1690.33 2221.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 2.00 83097.41 80000.00 80000.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 2.00 1500.00 1294.16 500.00 BRR400-354 Little-T Channel Work and SH AQCR100-258 CDOT TSSIP 2016 SIG UPGRADE F 09/21/17 1.00 700.00 284.00 1.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 29.00 7502.58 2469.52 6135.93 STA094A-034 Critical Culvert Project on S 10/05/17 1.00 1250.00 1296.65 1900.00 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 8.00 500.00 783.17 500.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 3.00 1500.00 1273.67 820.00 C133A-042 SH 133 McClure Pass Slip 11/16/17 1.00 1600.00 2092.13 2500.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 1.00 1460.00 2707.50 1522.50 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 1.00 4000.00 3310.55 1552.74 NHPP0702-351 I-70: HLT GARAGE DOOR REPLACE 12/08/17 1.00 3825.25 3300.00 3300.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 101 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00045 Conc Washout Str Each =================================================== ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 6.00 1500.00 1523.42 878.93 BR3852-018 POA SCOUR US 385 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 22.00 1347.06 1356.32 1023.13 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 133.00 3296.51 1770.18 2656.73 =============== 208-00046 Pre-fab Conc Washout Str Each =================================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 5.00 2000.00 3048.88 1860.00 NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 1.00 1000.00 1022.50 500.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 10.00 1500.00 963.75 1200.00 STA0931-032 SH 93 Erosion Correction 02/09/17 1.00 1650.00 1134.50 750.00 BR0252-449 I-25 Woodmen NB 03/02/17 2.00 2000.00 1187.50 1250.00 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 2.00 2000.00 1986.80 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 21.00 1697.62 1512.38 1335.71 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 3.00 2500.00 6460.00 6460.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 3.00 2200.00 2214.13 1510.00 NHPP0703-433 EJMT S Bore Barrier, Handrail 04/13/17 2.00 3000.00 1573.17 2250.00 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 2.00 1805.00 2147.83 2170.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 4.00 2000.00 1200.00 1200.00 STAR400-348 Region 4 Controller and Cabin 05/04/17 5.00 700.00 280.00 150.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 4.00 2000.00 1352.50 1000.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 2.00 2500.00 3465.48 6200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 25.00 1928.40 1850.53 2188.00 MTCE0762-054 REGION 4 MTCE SECT1 I76 FORT 07/06/17 1.00 1500.00 2284.37 2500.00 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 3.00 1500.00 850.00 500.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 2.00 2500.00 3125.00 3125.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 2.00 1600.00 1110.93 2100.00 CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 1.00 2200.00 495.00 445.00 CR100-292 I25/ORCHARD EMERGENCY REPAIR 08/21/17 1.00 1.00 263.00 525.00 NHPP0821-108 SH 82 MP 45 OLVDS 09/07/17 1.00 1000.00 1268.33 705.00 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 2.00 1400.00 1679.40 2100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 13.00 1553.92 1535.96 1563.46 C0702-372 I-70 GWC Rockfall Fence Impro 10/12/17 2.00 5000.00 2775.00 1800.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 102 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00046 Pre-fab Conc Washout Str Each =================================================== CR100-286 R1 CURB RAMPS-PH 1 10/26/17 1.00 2500.00 2100.00 1200.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 2.00 2500.00 2019.62 900.00 ITSSW01-831 ITS WEATHER STATION UPGRADES 11/30/17 14.00 250.00 749.00 600.00 ITSSW02-003 ITS FIBER INSTALLATIONS FOR H 11/30/17 3.00 1600.00 473.75 500.00 MTCE092A-027 MTCE R3 FY18 SH 92 STR I-06-A 12/07/17 1.00 1500.00 1553.33 460.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 23.00 1186.96 972.98 737.39 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 82.00 1601.96 1409.02 1463.84 =============== 208-00051 Storm Drain Inlet Protection (Type I) Lin Foot =============================================== NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 300.00 20.00 12.85 20.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 18.00 25.00 27.71 50.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 160.00 20.00 8.10 5.36 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 14.00 20.00 15.87 9.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 20.00 10.00 8.24 9.00 BR0252-449 I-25 Woodmen NB 03/02/17 24.00 10.00 31.25 20.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 300.00 15.00 14.78 19.00 MTCE2873-191 R4 FY 17 Stencils #1 03/23/17 100.00 12.00 26.67 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 936.00 17.17 15.03 16.29 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 70.00 10.00 15.20 15.20 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 20.00 11.00 24.83 22.60 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 20.00 20.00 14.80 14.29 NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 100.00 11.00 21.81 12.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 55.00 20.00 4.75 4.75 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 7.00 150.00 13.54 12.50 ER0361-115 US 36 Bridges 06/22/17 259.00 10.00 6.65 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 531.00 13.48 10.58 9.24 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 60.00 20.00 26.00 26.00 CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 100.00 12.00 17.88 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 160.00 15.00 19.75 25.38 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 121.00 15.00 2.97 3.40 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 103 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00051 Storm Drain Inlet Protection (Type I) Lin Foot =============================================== STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 84.00 13.00 10.08 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 205.00 14.18 7.10 4.88 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,832.00 15.58 12.61 13.76 =============== 208-00052 Storm Drain Inlet Protection (Type II) Lin Foot =============================================== NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 300.00 50.00 61.24 37.50 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 2.00 40.00 149.60 200.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 80.00 30.00 35.59 31.06 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 50.00 35.00 10.62 5.15 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 350.00 22.64 52.10 19.00 MTCE2873-191 R4 FY 17 Stencils #1 03/23/17 100.00 45.00 61.67 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 882.00 35.89 51.30 25.56 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 350.00 50.00 58.00 58.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 325.00 50.00 60.26 55.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 10.00 55.00 99.40 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 685.00 50.07 61.00 57.34 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 60.00 55.00 30.00 30.00 CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 100.00 50.00 46.38 82.00 AQCR100-258 CDOT TSSIP 2016 SIG UPGRADE F 09/21/17 42.00 55.00 53.67 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 202.00 52.52 46.21 54.70 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 6.00 25.00 25.75 26.25 NHPP0702-351 I-70: HLT GARAGE DOOR REPLACE 12/08/17 52.00 23.10 27.43 27.43 STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 24.00 50.00 62.00 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 82.00 31.11 50.55 26.63 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,851.00 42.74 52.98 40.55 =============== 208-00053 Storm Drain Inlet Protect (Ty I)(84 In) Each =================================================== NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 3.00 250.00 311.30 275.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 104 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00053 Storm Drain Inlet Protect (Ty I)(84 In) Each =================================================== STA0362-035 US 36: Strasburg to Byers 03/23/17 1.00 1000.00 1495.39 383.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 437.50 459.31 302.08 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 2.00 20.00 250.27 230.00 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 10.00 300.00 225.39 211.18 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 300.00 20.00 106.38 50.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1.00 55.00 333.73 347.59 NHPPC120-026 US 85: I-76 to 168th 05/04/17 5.00 100.01 222.21 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 318.00 30.17 115.34 61.85 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 1.00 750.00 213.48 216.00 BRR400-354 Little-T Channel Work and SH SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 27.00 120.00 234.00 310.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 28.00 142.50 232.45 306.64 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 6.00 120.00 337.50 175.00 ITSSW02-003 ITS FIBER INSTALLATIONS FOR H 11/30/17 13.00 250.00 165.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 19.00 208.95 197.34 123.68 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 369.00 52.32 140.95 86.22 =============== 208-00054 Storm Drain Inlet Protection (Type II) Each =================================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 162.00 40.00 162.65 131.00 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 33.00 250.00 193.67 216.00 NHPP 0701-230 Midpoint WB Bore 03/02/17 6.00 53.50 220.33 64.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 201.00 74.88 169.46 142.96 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 150.00 50.00 328.38 130.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 105 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00054 Storm Drain Inlet Protection (Type II) Each =================================================== STAR500-190 R5 Signal Replacement Chaffee 04/27/17 4.00 400.00 398.33 360.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 5.00 100.01 412.13 550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 159.00 60.38 332.78 148.99 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 6.00 250.00 387.50 275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 250.00 387.50 275.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 366.00 71.45 243.20 147.74 =============== 208-00055 Rigid Inlet Prot Device Each =================================================== STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 4.00 165.00 249.09 230.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 165.00 249.09 230.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 165.00 249.09 230.00 =============== 208-00056 Storm Drain Inlet Protection (Type III) Each =================================================== STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 2.00 50.00 484.50 800.00 STA0931-032 SH 93 Erosion Correction 02/09/17 1.00 1250.00 383.00 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 450.00 441.00 583.33 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 4.00 300.00 150.00 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 300.00 150.00 150.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 8.00 350.00 178.33 148.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 350.00 178.33 148.00 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 6.00 500.00 400.00 300.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 106 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00056 Storm Drain Inlet Protection (Type III) Each =================================================== NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 155.00 250.00 467.06 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 161.00 259.32 466.04 300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 176.00 267.61 435.88 294.51 =============== 208-00060 Temporary Slope Drain Lin Foot =============================================== STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 246.00 14.50 55.68 55.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 246.00 14.50 55.68 55.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 246.00 14.50 55.68 55.65 =============== 208-00070 Vehicle Tracking Pad Each =================================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 2.00 1750.00 3061.85 2550.00 NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 2.00 2500.00 3016.75 3033.50 NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 1.00 2000.00 6238.43 6500.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 6.00 2000.00 2237.71 2500.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 1.00 3500.00 2929.78 1950.00 IM025A-039 I-25 Critical Culvert at MP 1 02/09/17 1.00 2200.00 2349.11 2005.77 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 1.00 3000.00 2213.33 2340.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 2.00 2500.00 2060.00 1500.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 1.00 1000.00 1794.68 2033.88 SHE160A-031 SH 160 Passing Lanes 03/02/17 4.00 2290.00 2970.31 2250.00 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 2.00 4000.00 4292.00 3750.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 2.00 2000.00 1860.00 1350.00 ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 4.00 3825.00 3825.00 3825.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 1.00 2500.00 3521.17 3272.76 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 1.00 5000.00 3618.90 2200.00 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 1.00 2500.00 4100.00 4000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 32.00 2614.38 2907.89 2774.81 STA006A-057 SH 6 EAST OF STERLING 04/06/17 1.00 1996.00 1663.07 1750.00 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 2.00 2500.00 1483.43 2050.29 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 4.00 2500.00 2804.14 1334.52 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 4.00 2000.00 2730.00 2250.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 2.00 2500.00 1883.39 1350.17 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 107 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00070 Vehicle Tracking Pad Each =================================================== NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 2.00 2000.00 1000.00 1000.00 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 3.00 1540.00 1952.01 1950.74 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 1.00 3500.00 3199.20 2000.00 ER0361-115 US 36 Bridges 06/22/17 12.00 1500.00 2266.67 1900.00 ER0341-093 PR US 34 BIG THOMPSON CANYON 06/28/17 1.00 8335.00 8335.00 8335.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 32.00 2139.09 2464.10 1996.13 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 2.00 2000.00 2250.00 3000.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 1.00 2500.00 2220.23 1825.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 2.00 2000.00 2745.82 3682.97 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 1.00 2500.00 3821.33 1964.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 89.00 2963.04 4200.00 4200.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 4.00 2000.00 2524.26 2800.00 BRR400-354 Little-T Channel Work and SH NHPP0821-108 SH 82 MP 45 OLVDS 09/07/17 1.00 2000.00 2341.33 2174.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 100.00 2867.11 3392.74 4043.29 STA094A-034 Critical Culvert Project on S 10/05/17 1.00 2000.00 2635.82 1500.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 4.00 2000.00 622.00 765.00 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 1.00 2500.00 3102.17 3300.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 2.00 3000.00 2979.00 2250.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 1.00 2270.00 1966.67 1500.00 CC0341-100 US 34 BIG THOMPSON CANYON MOO 12/11/17 1.00 5514.51 3600.00 3600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 2628.45 2149.17 1746.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 174.00 2673.02 2873.44 3310.73 =============== 208-00071 Maint Aggregate (Veh Track Pad) Cubic Yard ============================================= ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 370.00 56.00 56.00 56.00 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 28.00 75.00 80.80 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 398.00 57.34 62.81 59.10 ER0341-093 PR US 34 BIG THOMPSON CANYON 06/28/17 80.00 40.00 40.00 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 80.00 40.00 40.00 40.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 108 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00071 Maint Aggregate (Veh Track Pad) Cubic Yard ============================================= ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 8,240.00 65.77 80.00 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8,240.00 65.77 80.00 80.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 30.00 100.00 141.92 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 30.00 100.00 141.92 40.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,748.00 65.27 79.70 78.55 =============== 208-00075 Pre-fab Vehicle Track Pad Each =================================================== NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 1.00 1000.00 1429.99 800.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 4.00 1750.00 1330.00 2000.00 STA0931-032 SH 93 Erosion Correction 02/09/17 3.00 1650.00 2264.54 575.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 1618.75 1802.83 1315.63 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 2.00 1500.00 1730.00 2200.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 2.00 1000.01 2424.88 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 1250.01 2027.81 2600.00 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 2.00 1500.00 1325.00 1250.00 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 1.00 1000.00 3366.67 2850.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 2.00 2000.00 2600.00 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.00 1600.00 2384.62 2270.00 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 9.00 2300.00 2354.63 1602.42 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 109 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00075 Pre-fab Vehicle Track Pad Each =================================================== BR3852-018 POA SCOUR US 385 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9.00 2300.00 2354.63 1602.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26.00 1794.23 2163.75 1796.03 =============== 208-00103 Removal and Disposal of Sediment (Labor) Hour =================================================== NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 8.00 28.00 56.94 55.00 NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 145.00 45.00 153.98 107.00 NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 20.00 100.00 70.53 66.05 NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 8.00 100.00 73.91 70.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 120.00 55.00 66.75 50.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 200.00 65.00 53.16 33.00 STM0243-089 Midpoint: Station 1019+50 Cen MTCER100-274 MTCE R1 FY 17 SH 119 Signing 01/26/17 10.00 55.00 81.25 55.00 STA0931-032 SH 93 Erosion Correction 02/09/17 50.00 40.00 55.57 22.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 60.00 60.00 54.17 52.51 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 40.00 65.00 65.60 99.80 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 80.00 50.00 41.40 35.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 10.00 45.00 55.70 56.10 SHE160A-031 SH 160 Passing Lanes 03/02/17 270.00 55.00 52.26 43.75 NHPP 0701-230 Midpoint WB Bore 03/02/17 8.00 40.00 65.17 54.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 20.00 60.00 35.22 40.00 BR0252-449 I-25 Woodmen NB 03/02/17 15.00 50.00 57.75 35.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 30.00 45.00 51.37 61.60 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 15.00 55.50 124.75 80.00 ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 20.00 44.00 44.00 44.00 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 10.00 40.00 84.46 45.00 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 20.00 60.00 72.58 60.00 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 52.00 50.00 87.90 65.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 30.00 42.00 70.00 30.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 20.00 45.00 91.63 35.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,261.00 54.63 64.82 54.63 STA006A-057 SH 6 EAST OF STERLING 04/06/17 20.00 45.00 46.27 40.00 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 25.00 55.00 126.00 126.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 80.00 65.00 127.13 116.00 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 200.00 70.00 50.42 51.26 NHPP0703-433 EJMT S Bore Barrier, Handrail 04/13/17 10.00 110.00 58.99 60.00 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 20.00 51.00 143.77 125.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 400.00 50.00 53.24 127.02 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 110 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00103 Removal and Disposal of Sediment (Labor) Hour =================================================== STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 80.00 54.00 44.06 36.30 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 40.00 80.00 61.67 60.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 20.00 60.00 54.56 48.67 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 26.00 50.00 95.00 95.00 STAR400-348 Region 4 Controller and Cabin 05/04/17 42.00 40.00 55.00 50.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 90.00 50.00 55.50 40.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 40.00 40.01 138.41 45.00 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 10.00 90.00 62.50 40.00 AQC088A-035 Traffic Signal/Fiber Optic In 05/18/17 10.00 100.00 29.89 48.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 10.00 65.00 44.05 35.00 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 5.00 75.00 61.30 40.00 STA0061-091 SH 6 CHIPSEAL NEAR FLEMING 06/15/17 5.00 55.00 62.00 76.00 MTCE141A-048 SH 141A WHITEWATER IN MESA CO 06/15/17 20.00 60.00 40.00 40.00 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 20.00 70.00 51.40 50.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 40.00 50.00 77.68 50.00 STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 40.00 40.00 36.80 32.00 MTCE142A-002 SH 142 CHIPSEAL 06/22/17 8.00 25.00 55.00 55.00 ER0361-115 US 36 Bridges 06/22/17 220.00 55.00 38.22 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,481.00 56.11 54.04 74.12 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 40.00 50.00 47.80 35.00 ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 20.00 60.00 91.00 82.00 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 40.00 60.00 40.50 28.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 40.00 75.00 85.00 85.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 50.00 55.00 52.98 60.00 CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 60.00 65.00 83.75 60.00 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 20.00 85.00 63.33 70.00 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 40.00 60.00 42.65 48.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 50.00 50.00 66.86 62.33 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 140.00 66.00 124.00 50.00 MTCE131A-039 SH 131 MP 0.053-68.721 IN EAG 08/17/17 20.00 55.00 46.33 49.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 60.00 55.00 69.83 42.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1,200.00 42.99 50.00 50.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 140.00 50.00 40.67 38.00 BRR400-354 Little-T Channel Work and SH NHPP0821-108 SH 82 MP 45 OLVDS 09/07/17 6.00 50.00 56.33 34.00 AQCR100-258 CDOT TSSIP 2016 SIG UPGRADE F 09/21/17 2.00 75.00 57.67 50.00 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 40.00 55.00 54.20 85.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,968.00 49.15 55.44 50.87 STA094A-034 Critical Culvert Project on S 10/05/17 10.00 55.00 45.32 58.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 111 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00103 Removal and Disposal of Sediment (Labor) Hour =================================================== ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 8.00 50.00 58.33 75.00 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 30.00 100.00 93.50 42.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 40.00 50.00 31.67 60.00 C133A-042 SH 133 McClure Pass Slip 11/16/17 30.00 55.00 60.38 75.00 STRR300-228 SH 13 R3 VARIOUS CHIP SEALS 11/30/17 20.00 60.00 48.75 40.00 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 10.00 52.00 60.29 40.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 40.00 100.00 152.20 65.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 20.00 45.00 61.67 75.00 ITSSW01-831 ITS WEATHER STATION UPGRADES 11/30/17 28.00 50.00 70.99 45.00 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 40.00 60.00 57.54 87.70 NHPP006A-059 US 6 CLEAR CREEK CANYON SH 93 12/14/17 12.00 150.00 155.67 50.00 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 40.00 50.00 52.25 35.00 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 40.00 60.00 75.36 67.74 BR3852-018 POA SCOUR US 385 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 368.00 65.82 73.00 59.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,078.00 53.75 58.85 59.30 =============== 208-00105 Removal and Disposal of Sediment (Equip) Hour =================================================== NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 8.00 65.00 132.94 135.00 NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 145.00 92.00 224.52 183.00 NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 20.00 100.00 81.93 162.15 NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 8.00 200.00 129.88 16.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 240.00 120.00 127.00 150.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 200.00 100.00 104.59 63.00 STM0243-089 Midpoint: Station 1019+50 Cen STA0931-032 SH 93 Erosion Correction 02/09/17 20.00 100.00 117.17 45.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 60.00 100.00 125.01 105.02 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 40.00 120.00 121.67 167.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 60.00 125.00 99.00 60.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 4.00 140.00 119.90 137.70 SHE160A-031 SH 160 Passing Lanes 03/02/17 320.00 109.00 124.84 100.00 NHPP 0701-230 Midpoint WB Bore 03/02/17 8.00 110.00 236.00 108.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 20.00 110.00 86.78 80.00 BR0252-449 I-25 Woodmen NB 03/02/17 35.00 110.00 102.50 65.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 20.00 105.00 120.63 138.88 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 5.00 99.30 387.59 125.00 ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 20.00 110.00 110.00 110.00 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 4.00 100.00 161.32 65.00 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 28.00 100.00 181.00 200.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 30.00 95.00 80.00 50.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 20.00 60.00 168.87 212.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,315.00 107.21 129.59 119.56 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 112 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00105 Removal and Disposal of Sediment (Equip) Hour =================================================== STA006A-057 SH 6 EAST OF STERLING 04/06/17 20.00 90.00 90.04 75.00 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 15.00 100.00 241.00 241.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 80.00 120.00 242.26 220.00 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 80.00 120.00 152.92 153.77 NHPP0703-433 EJMT S Bore Barrier, Handrail 04/13/17 10.00 175.00 140.00 125.00 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 10.00 97.00 223.42 238.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 400.00 50.00 115.80 112.97 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 80.00 110.00 98.40 100.00 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 40.00 150.00 108.33 150.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 10.00 120.00 118.18 89.54 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 13.00 100.00 155.00 155.00 STAR400-348 Region 4 Controller and Cabin 05/04/17 42.00 85.00 65.00 50.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 20.00 110.00 116.25 110.00 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 20.00 175.00 60.00 35.00 AQC088A-035 Traffic Signal/Fiber Optic In 05/18/17 10.00 150.00 43.84 65.00 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 108.00 92.00 182.51 182.41 STA0703-437 I-70: 32ND TO 44TH 06/01/17 10.00 120.00 103.75 110.00 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 5.00 125.00 149.20 135.00 STA0061-091 SH 6 CHIPSEAL NEAR FLEMING 06/15/17 5.00 112.00 145.00 225.00 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 10.00 160.00 89.20 50.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 40.00 120.00 208.63 50.00 STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 10.00 140.00 50.60 48.00 MTCE142A-002 SH 142 CHIPSEAL 06/22/17 8.00 135.00 135.00 135.00 ER0361-115 US 36 Bridges 06/22/17 220.00 110.00 106.60 89.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,266.00 93.75 119.87 120.56 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 20.00 130.00 96.00 95.00 ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 20.00 110.00 70.50 41.00 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 8.00 140.00 132.50 125.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 40.00 150.00 160.00 160.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 25.00 135.00 142.38 150.00 CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 60.00 175.00 93.75 80.00 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 8.00 200.00 132.00 150.00 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 40.00 150.00 69.13 65.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 100.00 120.00 110.30 96.32 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 124.00 115.50 165.50 115.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 60.00 115.00 113.00 69.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1,200.00 105.29 110.00 110.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 70.00 100.00 104.81 62.00 BRR400-354 Little-T Channel Work and SH COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 113 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00105 Removal and Disposal of Sediment (Equip) Hour =================================================== AQCR100-258 CDOT TSSIP 2016 SIG UPGRADE F 09/21/17 2.00 150.00 77.67 75.00 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 40.00 110.00 106.00 118.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,817.00 112.64 110.42 105.51 STA094A-034 Critical Culvert Project on S 10/05/17 10.00 110.00 105.30 125.00 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 8.00 125.00 121.33 75.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 40.00 120.00 63.00 93.00 C133A-042 SH 133 McClure Pass Slip 11/16/17 20.00 110.00 136.65 160.00 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 10.00 110.00 139.58 110.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 40.00 150.00 225.60 110.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 20.00 80.00 123.33 100.00 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 40.00 120.00 148.57 107.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 188.00 120.21 145.13 109.49 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,586.00 106.18 121.93 113.73 =============== 208-00106 Sweeping (Sediment Removal) Hour =================================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 290.00 160.00 212.26 136.00 NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 20.00 300.00 216.92 215.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 480.00 125.00 142.00 100.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 200.00 150.00 183.76 120.00 STM0243-089 Midpoint: Station 1019+50 Cen STA0931-032 SH 93 Erosion Correction 02/09/17 40.00 140.00 157.59 65.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 40.00 160.00 178.35 210.04 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 40.00 200.00 151.00 148.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 56.00 200.00 152.00 130.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 40.00 100.00 235.35 291.04 SHE160A-031 SH 160 Passing Lanes 03/02/17 330.00 150.00 162.59 87.50 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 20.00 150.00 236.00 145.00 NHPP 0701-230 Midpoint WB Bore 03/02/17 4.00 150.00 321.75 75.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 20.00 145.00 135.80 160.00 BR0252-449 I-25 Woodmen NB 03/02/17 35.00 150.00 141.25 65.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 120.00 135.92 155.01 135.00 ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 30.00 164.00 164.00 164.00 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 144.00 140.00 143.85 95.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 100.00 150.00 215.58 235.88 MTCE2873-191 R4 FY 17 Stencils #1 03/23/17 40.00 140.00 145.00 20.00 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 40.00 200.00 181.80 200.00 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 24.00 160.00 152.80 150.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 38.00 135.92 171.33 204.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 114 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00106 Sweeping (Sediment Removal) Hour =================================================== STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 100.00 225.00 202.11 195.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,251.00 151.20 167.29 127.95 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 215.00 155.00 144.00 144.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 80.00 170.00 181.73 130.00 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 144.00 200.00 158.13 179.40 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 100.00 128.00 172.05 135.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 800.00 50.00 133.44 109.70 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 80.00 140.00 182.00 70.00 NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 40.00 165.00 143.75 145.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 8.00 130.00 130.99 117.97 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 40.00 150.00 240.00 240.00 STAR400-348 Region 4 Controller and Cabin 05/04/17 21.00 150.00 115.00 50.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 80.00 140.00 116.50 130.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 100.00 150.01 157.31 125.00 STAR100-255 R1 FY18 CRACK SEAL 05/11/17 100.00 160.00 117.50 150.00 AQC088A-035 Traffic Signal/Fiber Optic In 05/18/17 20.00 200.00 111.82 135.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 10.00 160.00 163.58 220.00 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 5.00 150.00 131.18 125.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 40.00 150.00 215.88 100.00 STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 80.00 135.00 103.60 63.00 ER0361-115 US 36 Bridges 06/22/17 440.00 150.00 125.43 135.00 ER0341-093 PR US 34 BIG THOMPSON CANYON 06/28/17 20.00 208.00 208.00 208.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,423.00 120.52 135.80 126.90 MTCE0762-054 REGION 4 MTCE SECT1 I76 FORT 07/06/17 20.00 140.00 167.17 138.00 ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 20.00 150.00 138.50 177.00 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 40.00 140.00 106.00 87.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 40.00 175.00 200.00 200.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 50.00 150.00 155.17 190.00 CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 60.00 175.00 140.00 140.00 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 16.00 200.00 187.67 175.00 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 40.00 175.00 123.29 135.00 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 12.00 176.00 151.50 135.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 10.00 150.00 116.33 69.00 NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 5.00 155.00 177.50 130.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1,800.00 170.00 175.00 175.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 120.00 140.00 152.27 140.00 BRR400-354 Little-T Channel Work and SH AQCR100-258 CDOT TSSIP 2016 SIG UPGRADE F 09/21/17 8.00 150.00 93.00 5.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 115 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00106 Sweeping (Sediment Removal) Hour =================================================== SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 150.00 140.00 161.40 155.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,391.00 165.62 160.75 168.10 STA094A-034 Critical Culvert Project on S 10/05/17 10.00 145.00 127.04 125.00 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 16.00 150.00 165.83 100.00 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 50.00 165.00 147.50 45.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 40.00 150.00 69.67 93.00 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 18.00 200.00 172.63 90.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 40.00 165.00 189.76 150.00 ITSSW01-831 ITS WEATHER STATION UPGRADES 11/30/17 28.00 125.00 104.38 58.00 ITSSW02-003 ITS FIBER INSTALLATIONS FOR H 11/30/17 12.00 150.00 106.50 100.00 MTCE092A-027 MTCE R3 FY18 SH 92 STR I-06-A 12/07/17 4.00 150.00 101.67 100.00 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 40.00 160.00 248.58 232.91 NHPP0702-351 I-70: HLT GARAGE DOOR REPLACE 12/08/17 2.00 102.39 79.44 79.44 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 20.00 120.00 179.38 125.00 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 40.00 155.00 171.10 155.17 BR3852-018 POA SCOUR US 385 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 320.00 154.39 163.18 118.27 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,385.00 145.94 150.69 140.35 =============== 208-00107 Rem Trash Hour =================================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 145.00 70.00 153.98 107.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 20.00 50.00 80.25 75.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 200.00 65.00 96.09 50.00 STM0243-089 Midpoint: Station 1019+50 Cen STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 40.00 80.00 109.17 52.51 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 40.00 100.00 112.00 136.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 40.00 100.00 92.00 95.00 NHPP 0701-230 Midpoint WB Bore 03/02/17 4.00 100.00 71.00 87.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 20.00 80.00 72.82 160.00 BR0252-449 I-25 Woodmen NB 03/02/17 35.00 50.00 69.50 50.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 20.00 50.00 85.70 61.60 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 20.00 68.62 157.80 115.00 ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 10.00 193.00 193.00 193.00 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 40.00 55.00 87.78 45.00 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 4.00 100.00 205.35 300.00 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 20.00 90.00 156.80 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 658.00 72.65 109.59 88.02 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 116 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00107 Rem Trash Hour =================================================== STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 50.00 95.00 164.00 164.00 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 20.00 100.00 84.59 153.77 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 30.00 75.00 121.64 120.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 300.00 75.00 86.48 133.95 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 80.00 87.00 53.52 39.60 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 26.00 75.00 48.00 48.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 20.00 90.00 212.25 40.00 STAR100-255 R1 FY18 CRACK SEAL 05/11/17 5.00 100.00 59.00 100.00 AQC088A-035 Traffic Signal/Fiber Optic In 05/18/17 2.00 145.00 28.89 45.00 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 93.00 90.00 62.60 35.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 10.00 100.00 98.76 110.00 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 5.00 150.00 102.28 105.00 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 16.00 220.00 127.00 50.00 ER0361-115 US 36 Bridges 06/22/17 24.00 85.00 49.72 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 681.00 86.17 85.76 99.13 MTCE0762-054 REGION 4 MTCE SECT1 I76 FORT 07/06/17 20.00 50.00 67.24 75.00 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 10.00 60.00 45.67 23.33 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 50.00 55.00 76.82 65.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 25.00 82.00 87.67 48.00 NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 4.00 85.00 67.50 40.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 600.00 143.20 190.00 190.00 NHPP0821-108 SH 82 MP 45 OLVDS 09/07/17 10.00 60.00 56.33 34.00 AQCR100-258 CDOT TSSIP 2016 SIG UPGRADE F 09/21/17 2.00 150.00 41.00 10.00 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 120.00 85.00 99.00 67.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 841.00 123.38 123.35 153.08 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 5.00 70.00 97.50 45.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 40.00 80.00 35.33 71.00 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 15.00 100.00 132.35 40.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 40.00 125.00 192.80 150.00 MTCE092A-027 MTCE R3 FY18 SH 92 STR I-06-A 12/07/17 4.00 50.00 111.00 133.00 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 40.00 80.00 118.70 103.52 NHPP0702-351 I-70: HLT GARAGE DOOR REPLACE 12/08/17 2.00 105.20 75.63 75.63 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 20.00 50.00 95.63 75.00 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 40.00 70.00 103.38 76.15 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 117 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00107 Rem Trash Hour =================================================== BR3852-018 POA SCOUR US 385 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 206.00 84.76 118.22 92.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,386.00 95.43 101.22 115.66 =============== 208-00207 Erosion Control Management Day ==================================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 145.00 150.00 277.27 137.00 NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 100.00 220.00 559.13 610.26 NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 12.00 175.00 301.50 500.00 NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 75.00 200.00 159.16 100.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 150.00 215.00 237.25 300.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 400.00 150.00 186.07 33.00 STM0243-089 Midpoint: Station 1019+50 Cen MTCER100-274 MTCE R1 FY 17 SH 119 Signing 01/26/17 60.00 85.00 180.00 30.00 NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 20.00 200.00 365.36 135.00 IM025A-039 I-25 Critical Culvert at MP 1 02/09/17 60.00 250.00 258.10 95.90 STA0931-032 SH 93 Erosion Correction 02/09/17 25.00 200.00 215.50 150.00 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 20.00 200.00 258.33 452.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 200.00 450.00 203.60 50.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 120.00 180.00 332.92 394.74 SHE160A-031 SH 160 Passing Lanes 03/02/17 130.00 200.00 238.81 75.00 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 36.00 350.00 336.00 550.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 132.00 200.00 171.80 155.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 15.00 250.00 403.33 504.00 STA2873-183 US 287 Repairs at LCR 17 03/09/17 40.00 225.00 381.67 440.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 10.00 1200.00 254.30 95.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 190.00 214.00 357.51 471.75 MTCE2873-191 R4 FY 17 Stencils #1 03/23/17 5.00 300.00 616.67 150.00 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 36.00 500.00 290.90 250.00 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 18.00 250.00 412.60 250.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 8.00 1200.00 585.00 405.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,007.00 230.10 251.31 226.70 STA006A-057 SH 6 EAST OF STERLING 04/06/17 30.00 150.00 307.54 510.00 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 85.00 225.00 340.00 340.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 80.00 250.00 360.38 330.00 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 150.00 300.00 200.84 102.51 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 70.00 300.00 335.23 309.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 300.00 300.00 159.77 238.53 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 218.00 300.00 224.80 109.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 118 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00207 Erosion Control Management Day ==================================================== STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 27.00 300.00 356.36 145.07 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 90.00 200.00 140.00 140.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 90.00 200.00 189.50 40.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 150.00 200.01 185.90 100.00 AQC088A-035 Traffic Signal/Fiber Optic In 05/18/17 4.00 250.00 202.40 350.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 150.00 250.00 186.83 45.00 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 16.00 250.00 440.20 500.00 ER0361-115 US 36 Bridges 06/22/17 200.00 185.00 139.03 175.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,660.00 252.18 187.14 174.21 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 115.00 230.00 185.00 35.00 ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 7.00 1000.00 549.50 870.00 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 23.00 165.00 222.50 115.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 40.00 275.00 285.00 285.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 160.00 200.00 138.85 115.00 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 7.00 500.00 493.33 380.00 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 225.00 300.00 290.12 380.65 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 50.00 235.00 225.50 339.97 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 41.00 200.00 300.00 300.00 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 12.00 250.00 317.00 250.00 CR100-292 I25/ORCHARD EMERGENCY REPAIR 08/21/17 6.00 1.00 75.50 150.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 90.00 221.67 440.94 142.82 NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 3.00 275.00 300.00 100.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 210.00 175.00 134.83 50.00 BRR400-354 Little-T Channel Work and SH AQCR100-258 CDOT TSSIP 2016 SIG UPGRADE F 09/21/17 4.00 250.00 178.00 50.00 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 120.00 300.00 154.77 134.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,113.00 241.44 199.49 183.29 STA094A-034 Critical Culvert Project on S 10/05/17 14.00 305.00 167.99 125.00 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 16.00 225.00 246.67 16.00 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 10.00 150.00 440.00 280.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 200.00 250.00 98.67 120.00 C133A-042 SH 133 McClure Pass Slip 11/16/17 20.00 300.00 303.43 290.00 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 50.00 300.00 205.06 175.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 205.00 250.00 289.80 325.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 100.00 250.00 188.33 100.00 ITSSW01-831 ITS WEATHER STATION UPGRADES 11/30/17 28.00 225.00 736.21 150.00 ITSSW02-003 ITS FIBER INSTALLATIONS FOR H 11/30/17 5.00 300.00 656.75 400.00 NHPP006A-059 US 6 CLEAR CREEK CANYON SH 93 12/14/17 35.00 320.00 498.67 585.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 683.00 257.13 258.49 214.72 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,463.00 242.50 218.38 199.41 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 119 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00300 Temporary Berms Lin Foot =============================================== STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 246.00 2.75 5.63 5.62 ER0341-093 PR US 34 BIG THOMPSON CANYON 06/28/17 375.00 15.00 15.00 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 621.00 10.15 9.68 11.28 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 380.00 10.00 20.07 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 380.00 10.00 20.07 25.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,001.00 10.09 15.58 16.49 =============== 208-00301 Temporary Diversion Lin Foot =============================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 11,064.00 175.26 275.00 275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 11,064.00 175.26 275.00 275.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,064.00 175.26 275.00 275.00 =============== 208-00303 Temporary Diversion (Special) Lin Foot =============================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 3,087.00 284.28 275.00 275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,087.00 284.28 275.00 275.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,087.00 284.28 275.00 275.00 =============== 208-00400 Water Control LUMP SUM =============================================== NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 1.00 50000.00 39777.80 25000.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1.00 6000.00 26360.00 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 28000.00 34187.05 13500.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1.00 25000.00 41533.93 33500.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 120 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00400 Water Control LUMP SUM =============================================== STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 1.00 15000.00 14559.30 15177.90 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 1.00 30000.00 13450.60 2500.00 ER0361-115 US 36 Bridges 06/22/17 1.00 75000.00 124785.60 150000.00 ER0341-093 PR US 34 BIG THOMPSON CANYON 06/28/17 1.00 339940.00 339940.00 339940.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 96988.00 62888.58 108223.58 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 1.00 20000.00 35647.33 10942.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 20000.00 35647.33 10942.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 70117.50 52742.34 72382.49 =============== 208-00500 Swale Protect Type 1 Lin Foot =============================================== ER0341-093 PR US 34 BIG THOMPSON CANYON 06/28/17 40.00 40.45 40.45 40.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 40.00 40.45 40.45 40.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 40.45 40.45 40.45 =============== 208-00521 Temp Stream Crossing Each =================================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1.00 139501.45 230000.00 230000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 139501.45 230000.00 230000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 139501.45 230000.00 230000.00 =============== 210-00001 Res Structure Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1.00 1500.00 2260.00 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1500.00 2260.00 2500.00 ER0361-115 US 36 Bridges 06/22/17 3.00 1500.00 1277.87 620.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 1500.00 1277.87 620.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 121 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00001 Res Structure Each =================================================== ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 1.00 1500.00 3616.67 3100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1500.00 3616.67 3100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 1500.00 1736.60 1492.00 =============== 210-00010 Res Mailbox Str Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1.00 250.00 351.60 516.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 250.00 351.60 516.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 18.00 2035.24 3800.00 3800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 18.00 2035.24 3800.00 3800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19.00 1941.28 3050.35 3627.16 =============== 210-00011 Res Mailbox Str (Ty 1) Each =================================================== NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 4.00 500.00 332.59 350.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 43.00 250.00 166.75 170.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 47.00 271.28 174.12 185.32 STA006A-057 SH 6 EAST OF STERLING 04/06/17 4.00 225.00 327.02 260.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 225.00 327.02 260.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 51.00 267.65 180.63 191.18 =============== 210-00012 Res Mailbox Str (Ty 2) Each =================================================== NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 1.00 550.00 435.12 450.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 122 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00012 Res Mailbox Str (Ty 2) Each =================================================== STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 3.00 300.00 362.50 300.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 4.00 400.00 424.73 408.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 381.25 396.81 372.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 381.25 396.81 372.75 =============== 210-00013 Res Mailbox Str (Ty 3) Each =================================================== STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 3.00 450.00 518.25 500.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 2.00 425.00 475.23 433.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 440.00 503.91 473.40 ER0361-115 US 36 Bridges 06/22/17 1.00 550.00 425.00 565.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 550.00 425.00 565.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 458.33 484.18 488.67 =============== 210-00014 Res Mailbox Str (Ty 4) Each =================================================== NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 40.00 350.00 475.74 459.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 40.00 350.00 475.74 459.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 350.00 475.74 459.00 =============== 210-00015 Res End Section Each =================================================== SHE160A-031 SH 160 Passing Lanes 03/02/17 1.00 500.00 716.04 625.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 500.00 716.04 625.00 ER0361-115 US 36 Bridges 06/22/17 1.00 1500.00 704.96 700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 1500.00 704.96 700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1000.00 711.29 662.50 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 123 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00030 Res Water Service Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1.00 3500.00 1975.00 2700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 3500.00 1975.00 2700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 3500.00 1975.00 2700.00 =============== 210-00037 Reset Irrigation Pump Each =================================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 30.00 789.84 1300.00 1300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 30.00 789.84 1300.00 1300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 789.84 1300.00 1300.00 =============== 210-00060 Res Marker Each =================================================== STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 4.00 200.00 358.37 525.10 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 1.00 500.00 179.80 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 260.00 305.85 470.08 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 2.00 500.00 260.00 415.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 500.00 260.00 415.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 328.57 297.11 454.34 =============== 210-00065 Res Monument (Ty 3A) Each =================================================== STAR500-190 R5 Signal Replacement Chaffee 04/27/17 4.00 750.00 1035.00 1080.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 750.00 1035.00 1080.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 30.00 2500.00 2625.00 2625.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 30.00 2500.00 2625.00 2625.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 34.00 2294.12 2170.71 2443.24 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 124 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00090 Res Delineator Each =================================================== STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 4.00 50.00 41.61 100.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 11.00 25.00 22.90 26.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15.00 31.67 27.12 45.73 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 2.00 200.00 83.37 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 200.00 83.37 50.00 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 1.00 90.00 165.00 54.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 90.00 165.00 54.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18.00 53.61 38.55 46.67 =============== 210-00425 Res Bridge Railing Lin Foot =============================================== STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 20.00 110.00 222.13 371.39 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20.00 110.00 222.13 371.39 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 110.00 222.13 371.39 =============== 210-00473 Res TV Cameras Each =================================================== STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 4.00 1000.00 1341.00 1260.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 1.00 1200.00 850.00 850.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 1040.00 1317.62 1178.00 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 2.00 1000.00 2090.17 1250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 1000.00 2090.17 1250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 1028.57 1598.55 1198.57 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 125 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00476 Reset MVRD Each =================================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 2.00 2000.00 1662.18 1765.00 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 4.00 1000.00 1795.00 1680.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 1333.33 1722.55 1708.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 1333.33 1722.55 1708.33 =============== 210-00479 Res Radio Com Antenna Each =================================================== STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 1.00 700.00 671.00 671.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 1.00 1000.00 850.00 850.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 850.00 760.50 760.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 850.00 760.50 760.50 =============== 210-00500 Reb Port Present Str Each =================================================== NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 4.00 5000.00 1587.50 1300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 5000.00 1587.50 1300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 5000.00 1587.50 1300.00 =============== 210-00510 Reb Port Present Str LUMP SUM =============================================== ER0361-115 US 36 Bridges 06/22/17 1.00 10000.00 11827.78 7350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 10000.00 11827.78 7350.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 1.00 5000.00 10009.00 9500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 5000.00 10009.00 9500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 7500.00 11001.06 8425.00 =============== 210-00520 Reb Port Present Str Sq Yard ================================================ NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 47.00 200.00 1070.45 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 47.00 200.00 1070.45 1200.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 126 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00520 Reb Port Present Str Sq Yard ================================================ STA0703-437 I-70: 32ND TO 44TH 06/01/17 2.00 2000.00 5772.45 11900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 2000.00 5772.45 11900.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 49.00 273.47 1439.23 1636.73 =============== 210-00530 Rebuild Port of Present Str Sq Foot ================================================ BR0252-449 I-25 Woodmen NB 03/02/17 4.00 2153.00 606.25 525.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 2153.00 606.25 525.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 24.00 350.00 389.92 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 24.00 350.00 389.92 1000.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 24.00 450.00 814.14 900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 24.00 450.00 814.14 900.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 52.00 534.85 651.30 917.31 =============== 210-00750 Res Light Standard Each =================================================== STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 1.00 1500.00 3930.00 5000.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 6.00 2000.00 460.00 405.00 SHE160A-031 SH 160 Passing Lanes 03/02/17 3.00 1350.00 2285.52 1666.67 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 1755.00 1454.70 1243.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 26.00 1200.00 650.00 650.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 26.00 1200.00 650.00 650.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 127 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00750 Res Light Standard Each =================================================== IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 4.00 2500.00 2000.00 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 2500.00 2000.00 1200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 1468.75 1304.92 853.25 =============== 210-00760 Res Luminaire Each =================================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 2.00 300.00 381.84 320.00 STM0243-089 Midpoint: Station 1019+50 Cen -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 300.00 381.84 320.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 300.00 381.84 320.00 =============== 210-00810 Res Ground Sign Each =================================================== NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 3.00 360.00 337.99 261.50 NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 23.00 215.00 284.45 159.00 NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 10.00 300.00 287.55 275.10 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 11.00 225.00 194.25 200.00 NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 1.00 500.00 459.03 230.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 8.00 275.00 246.25 139.26 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 23.00 300.00 202.00 260.00 SHE160A-031 SH 160 Passing Lanes 03/02/17 7.00 360.00 390.69 388.89 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 2.00 275.00 269.20 210.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 4.00 237.00 457.69 437.98 MTCER300-238 MTCE R3 FY 17/18 REGION WIDE 03/30/17 5.00 350.00 342.50 525.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 97.00 276.99 275.70 249.85 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 4.00 250.00 230.00 230.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 7.00 250.00 215.08 150.00 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 3.00 400.00 344.73 364.18 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 2.00 110.00 452.37 367.50 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 15.00 450.00 598.33 600.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 3.00 350.00 325.00 325.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 128 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00810 Res Ground Sign Each =================================================== NHPPC120-026 US 85: I-76 to 168th 05/04/17 96.00 180.01 103.70 100.00 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 2.00 800.00 440.00 100.00 ER0361-115 US 36 Bridges 06/22/17 2.00 300.00 402.25 396.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 134.00 234.71 195.14 181.82 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 6.00 260.00 200.00 200.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 1.00 350.00 325.00 325.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 3.00 280.00 525.00 400.00 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 13.00 100.00 333.33 400.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 12.00 300.00 276.04 308.00 BRR400-354 Little-T Channel Work and SH SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 6.00 200.00 293.02 102.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 41.00 215.85 287.46 298.37 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 1.00 215.00 200.00 250.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 13.00 300.00 185.33 275.00 NHPP006A-059 US 6 CLEAR CREEK CANYON SH 93 12/14/17 5.00 200.00 412.50 437.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 19.00 269.21 246.71 316.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 291.00 248.40 247.67 229.71 =============== 210-00815 Res Sign Panel Each =================================================== STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 2.00 300.00 171.34 241.02 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 10.00 300.00 236.00 338.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 5.00 170.00 97.36 52.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 4.00 250.00 230.00 120.00 MTCER300-238 MTCE R3 FY 17/18 REGION WIDE 03/30/17 10.00 100.00 81.25 130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 31.00 208.06 146.48 190.39 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 1.00 300.00 153.00 153.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 8.00 300.00 154.23 75.00 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 5.00 180.00 176.15 88.44 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 129 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00815 Res Sign Panel Each =================================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 2.00 150.00 79.47 33.10 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 24.00 200.00 283.33 210.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 8.00 300.00 124.48 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 48.00 231.25 201.04 151.28 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 5.00 250.00 235.00 235.00 NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 1.00 216.00 185.00 150.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1.00 60.00 263.00 263.00 MPR200-244 REGION 2 FY18 SIGNING PROJECT 09/14/17 13.00 105.00 143.33 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20.00 144.55 157.40 131.40 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 1.00 150.00 86.67 109.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 1.00 200.00 130.80 122.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 175.00 108.73 115.70 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 101.00 205.85 173.46 158.64 =============== 210-00825 Res Flashing Beacon Each =================================================== NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 8.00 2000.00 720.00 240.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 2000.00 720.00 240.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 3.00 2000.00 1838.37 2206.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 2000.00 1838.37 2206.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 2000.00 1494.26 776.18 =============== 210-00827 Res Pull Box Each =================================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 135.00 650.00 253.50 195.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 130 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00827 Res Pull Box Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 1.00 500.00 451.00 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 136.00 648.90 255.91 196.51 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 14.00 550.00 177.00 177.00 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 3.00 550.00 399.53 380.00 STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 4.00 348.00 707.50 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 21.00 511.52 378.51 267.52 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 2.00 650.00 490.00 480.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 1.00 700.00 759.00 776.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 666.67 605.29 578.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 160.00 631.20 269.85 212.99 =============== 210-00831 Res Traf Sig Head Each =================================================== NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 24.00 1500.00 780.00 360.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 24.00 1500.00 780.00 360.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 4.00 300.00 341.76 270.00 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 8.00 600.00 917.00 236.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12.00 500.00 533.51 247.33 NHPP0702-351 I-70: HLT GARAGE DOOR REPLACE 12/08/17 2.00 3880.95 5280.00 5280.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 3880.95 5280.00 5280.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 38.00 1309.52 708.30 583.37 =============== 210-00840 Res Traf Sig Pole Each =================================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 2.00 3000.00 4193.14 2510.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 131 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00840 Res Traf Sig Pole Each =================================================== STM0243-089 Midpoint: Station 1019+50 Cen -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 3000.00 4193.14 2510.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 3000.00 4193.14 2510.00 =============== 210-00847 Res Trav Time Ind Each =================================================== ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 2.00 1000.00 2415.17 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 1000.00 2415.17 1500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1000.00 2415.17 1500.00 =============== 210-00848 Res Traf Sig Control+Cab Each =================================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1.00 3500.00 2515.84 2427.63 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 3500.00 2515.84 2427.63 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 3500.00 2515.84 2427.63 =============== 210-00860 Res Ped Push Button Each =================================================== STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 2.00 100.00 1450.00 1450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 100.00 1450.00 1450.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 100.00 1450.00 1450.00 =============== 210-00865 Res Ped Sig Head Each =================================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 2.00 300.00 266.24 220.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 300.00 266.24 220.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 300.00 266.24 220.00 =============== 210-00867 Res Fire Preempt Unit Each =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 2.00 700.00 916.00 815.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 132 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00867 Res Fire Preempt Unit Each =================================================== SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 4.00 800.00 1008.33 375.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 766.67 966.36 521.67 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 2.00 1000.00 1050.00 1050.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 2.00 700.00 544.52 525.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 850.00 670.89 787.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 800.00 887.57 628.00 =============== 210-00890 Res Int Detect Sys (Camera) Each =================================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 5.00 750.00 1157.89 1213.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 3.00 800.00 1050.00 1050.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 768.75 1152.75 1151.88 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 768.75 1152.75 1151.88 =============== 210-01000 Res Fence Lin Foot =============================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 25.00 25.00 120.91 95.50 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 20.00 40.00 46.35 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 45.00 31.67 78.30 55.72 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1,117.00 6.00 7.82 7.45 NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 62.00 25.00 104.50 90.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 144.00 7.00 13.86 8.58 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 30.00 20.00 19.37 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,353.00 7.29 9.81 11.63 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 335.00 19.40 9.00 7.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 133 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-01000 Res Fence Lin Foot =============================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 60.00 20.00 153.00 153.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 395.00 19.49 17.11 29.18 STA094A-034 Critical Culvert Project on S 10/05/17 76.00 20.00 10.51 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 76.00 20.00 10.51 7.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,869.00 10.97 11.07 16.21 =============== 210-01011 Res Gate Each =================================================== ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 1.00 620.00 900.00 600.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 1.00 1000.00 408.63 366.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 810.00 513.92 483.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 810.00 513.92 483.00 =============== 210-01050 Res C L Fence Lin Foot =============================================== STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 13.00 20.00 60.41 36.24 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 520.00 20.00 17.00 17.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 533.00 20.00 20.03 17.47 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 62.00 35.00 25.64 23.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 62.00 35.00 25.64 23.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 595.00 21.56 23.11 18.05 =============== 210-01130 Res Gdrail Ty 3 Lin Foot =============================================== NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 50.00 8.80 155.00 130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 50.00 8.80 155.00 130.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 8.80 155.00 130.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 134 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-01180 Reset Guardrail (Special) Lin Foot =============================================== NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 890.00 12.00 15.62 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 890.00 12.00 15.62 10.00 NHPP0702-351 I-70: HLT GARAGE DOOR REPLACE 12/08/17 11,700.00 2.77 3.38 3.38 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 11,700.00 2.77 3.38 3.38 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12,590.00 3.42 6.75 3.85 =============== 210-01190 Reset Tensioned Cable Barrier Lin Foot =============================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1,270.00 55.00 18.81 15.44 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,270.00 55.00 18.81 15.44 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,270.00 55.00 18.81 15.44 =============== 210-01200 Res End Anchorage Each =================================================== NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 4.00 2000.00 1009.08 450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 2000.00 1009.08 450.00 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 1.00 2000.00 2029.72 2289.15 MTCE0253-259 I25 FROM MP 229.29 TO MP 244. 06/22/17 1.00 2000.00 2850.00 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 2000.00 2357.83 3644.58 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 2000.00 1527.83 1514.86 =============== 210-02510 Relay Sprinkler System LUMP SUM =============================================== SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 1.00 6000.00 3690.33 5470.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 6000.00 3690.33 5470.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 6000.00 3690.33 5470.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 135 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-02900 Relay Riprap Cubic Yard ============================================= STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 679.00 50.00 37.83 53.46 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 679.00 50.00 37.83 53.46 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 60.00 100.00 34.60 70.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 60.00 100.00 34.60 70.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 739.00 54.06 37.59 54.80 =============== 210-03100 Replace Conc Pvmt Sq Yard ================================================ NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 998.00 500.00 340.67 255.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 998.00 500.00 340.67 255.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 998.00 500.00 340.67 255.00 =============== 210-04000 Adj Structure Each =================================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 5.00 2250.00 3317.66 1200.00 STA2873-183 US 287 Repairs at LCR 17 03/09/17 17.00 650.00 2061.67 2400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 22.00 1013.64 2347.12 2127.27 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 22.00 1013.64 2347.12 2127.27 =============== 210-04010 Adj Manhole Each =================================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 334.00 1100.00 893.39 750.00 NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 18.00 500.00 2491.67 3000.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 15.00 700.00 777.50 750.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 38.00 800.00 1583.40 1050.19 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 5.00 600.00 1164.00 500.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 3.00 650.00 740.10 940.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 28.00 850.00 742.64 550.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 136 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-04010 Adj Manhole Each =================================================== STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 8.00 800.00 1511.28 2200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 449.00 1007.68 1013.16 877.45 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 101.00 500.00 664.00 664.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 148.00 900.00 822.24 1090.00 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 99.00 500.00 732.43 700.00 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 2.00 1200.00 1101.67 720.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 8.00 800.00 800.00 800.00 ER0361-115 US 36 Bridges 06/22/17 6.00 800.00 555.46 395.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 364.00 678.02 754.01 845.86 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 32.00 850.00 650.00 650.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 32.00 850.00 650.00 650.00 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 1.00 1100.00 525.00 550.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 10.00 800.00 628.67 865.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 10.00 850.00 986.38 1250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 21.00 838.10 844.26 1033.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 866.00 859.18 917.42 859.55 =============== 210-04015 Modify Manhole Each =================================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 12.00 1500.00 2523.91 1210.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12.00 1500.00 2523.91 1210.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 2.00 1500.00 1825.00 1825.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 1500.00 1825.00 1825.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 1500.00 2487.13 1297.86 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 137 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-04020 Modify Inlet Each =================================================== NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 40.00 510.00 3389.38 3387.50 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 1.00 3000.00 2418.00 1420.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 41.00 570.73 3350.52 3339.51 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 3.00 3000.00 5976.43 6700.00 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 3.00 2000.00 3360.00 1000.00 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 1.00 6000.00 5918.33 4200.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 1.00 2000.00 3446.25 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8.00 2875.00 4207.09 3725.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 4.00 1800.00 2925.42 1776.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 1800.00 2925.42 1776.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 53.00 1011.32 3464.96 3279.72 =============== 210-04025 Modify Structure Each =================================================== NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 1.00 1000.00 1825.00 1825.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 1000.00 1825.00 1825.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1000.00 1825.00 1825.00 =============== 210-04027 Modify Str (Spec) Each =================================================== NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 1.00 15000.00 36594.82 27858.06 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 15000.00 36594.82 27858.06 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 15000.00 36594.82 27858.06 =============== 210-04030 Modify Guardrail Lin Foot =============================================== NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 400.00 27.00 25.90 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 400.00 27.00 25.90 22.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 138 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-04030 Modify Guardrail Lin Foot =============================================== STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 10,957.00 10.00 4.97 4.16 STA0703-437 I-70: 32ND TO 44TH 06/01/17 5,256.00 20.00 7.80 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16,213.00 13.24 6.07 4.43 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 200.00 8.00 14.56 13.69 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 200.00 8.00 14.56 13.69 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16,813.00 13.51 6.45 4.96 =============== 210-04035 Modify Guardrail (Spec) Lin Foot =============================================== SHE160A-031 SH 160 Passing Lanes 03/02/17 625.00 15.00 8.86 10.11 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 11,977.00 8.00 2.41 2.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12,602.00 8.35 3.02 2.88 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12,602.00 8.35 3.02 2.88 =============== 210-04050 Adj Valve Box Each =================================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 345.00 800.00 560.00 650.00 NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 3.00 250.00 1208.33 1100.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 82.00 250.00 462.00 350.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 41.00 400.00 1013.38 840.15 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 5.00 500.00 560.00 250.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 12.00 342.00 442.85 250.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 2.00 275.00 1597.28 493.86 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 490.00 654.70 579.09 603.95 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 155.00 350.00 362.00 362.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 160.00 500.00 520.10 690.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 139 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-04050 Adj Valve Box Each =================================================== STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 91.00 350.00 488.34 450.00 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 6.00 1400.00 1200.00 360.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 4.00 250.00 280.00 280.00 ER0361-115 US 36 Bridges 06/22/17 6.00 400.00 380.96 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 422.00 421.56 486.72 503.65 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 8.00 500.00 400.00 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 500.00 400.00 400.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 8.00 400.00 175.33 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8.00 400.00 175.33 140.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 928.00 545.16 543.61 552.58 =============== 210-04200 Adj Gdrail Lin Foot =============================================== NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 450.00 10.00 8.23 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 450.00 10.00 8.23 6.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 450.00 10.00 8.23 6.00 =============== 211-00100 Drilling Hole Lin Foot =============================================== STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 240.00 40.00 61.63 47.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 240.00 40.00 61.63 47.20 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1,785.00 436.89 525.00 525.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,785.00 436.89 525.00 525.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,025.00 389.85 362.95 468.37 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 140 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 211-00225 4 Inch Core Drilled Hole Lin Foot =============================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 643.00 195.35 235.00 235.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 643.00 195.35 235.00 235.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 643.00 195.35 235.00 235.00 =============== 211-01115 Rock Reinf (No.10) Lin Foot =============================================== ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 500.00 94.00 94.00 94.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 500.00 94.00 94.00 94.00 NHPP006A-059 US 6 CLEAR CREEK CANYON SH 93 12/14/17 1,925.00 150.00 167.67 196.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,925.00 150.00 167.67 196.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,425.00 138.45 161.80 174.97 =============== 211-01300 Rock Anchor Each =================================================== IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 6.00 2000.00 3610.41 4500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 2000.00 3610.41 4500.00 C0702-372 I-70 GWC Rockfall Fence Impro 10/12/17 98.00 2500.00 2737.50 1250.00 NHPP006A-059 US 6 CLEAR CREEK CANYON SH 93 12/14/17 4.00 1500.00 2093.17 3967.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 102.00 2460.78 2700.33 1356.57 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 108.00 2435.19 2772.81 1531.20 =============== 211-02275 Cement Grout Cubic Yard ============================================= STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 20.00 300.00 575.17 974.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 300.00 575.17 974.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 141 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 211-02275 Cement Grout Cubic Yard ============================================= NHPP0703-433 EJMT S Bore Barrier, Handrail 04/13/17 77.00 500.00 1399.74 1150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 77.00 500.00 1399.74 1150.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 97.00 458.76 1304.96 1113.71 =============== 211-02277 Cement Grout (Voids) Cubic Yard ============================================= NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 85.00 550.00 1025.00 1900.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 8.00 500.00 1566.67 2800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 93.00 545.70 1092.01 1977.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 93.00 545.70 1092.01 1977.42 =============== 211-03005 Dewatering LUMP SUM =============================================== ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 1.00 178100.00 178100.00 178100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 178100.00 178100.00 178100.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1.00 25000.00 37099.32 13700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 25000.00 37099.32 13700.00 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 1.00 10000.00 41233.33 42600.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1.00 1551626.05 5000000.00 5000000.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 1.00 80000.00 112263.64 110000.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 547208.68 423906.67 1717533.33 STA094A-034 Critical Culvert Project on S 10/05/17 1.00 10000.00 6402.38 5000.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 142 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 211-03005 Dewatering LUMP SUM =============================================== CC0341-100 US 34 BIG THOMPSON CANYON MOO 12/11/17 1.00 64723.65 10000.00 10000.00 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 1.00 57500.00 59246.65 28559.92 BR3852-018 POA SCOUR US 385 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 53827.48 50062.28 21817.72 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 166369.52 120697.06 395768.54 =============== 212-00005 Seeding (Native) Pound ================================================== STM0211-026 SH21 AND MESA RIDGE PKWY SIGN 05/18/17 0.10 250.00 6465.00 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 0.10 250.00 6465.00 2000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 0.10 250.00 6465.00 2000.00 =============== 212-00006 Seeding (Native) Acre =================================================== NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 0.50 1500.00 1513.14 1000.00 NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 7.00 1200.00 2430.73 2461.45 NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 16.00 550.00 211.76 200.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 0.20 3000.00 7087.50 2000.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 38.00 700.00 790.22 440.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 0.23 4000.00 5576.73 4000.00 IM025A-039 I-25 Critical Culvert at MP 1 02/09/17 0.40 2000.00 11539.14 1888.00 STA0931-032 SH 93 Erosion Correction 02/09/17 0.45 3000.00 3001.17 1725.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 0.90 5000.00 1350.02 662.57 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 2.27 4300.00 957.20 761.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 0.50 6000.00 1572.80 1279.08 SHE160A-031 SH 160 Passing Lanes 03/02/17 9.34 635.00 585.49 635.56 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 0.36 5000.00 2730.00 2100.00 NHPP 0701-230 Midpoint WB Bore 03/02/17 0.84 3000.00 1122.62 1350.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 13.40 900.00 328.25 315.00 BR0252-449 I-25 Woodmen NB 03/02/17 0.60 2500.00 6075.00 2500.00 STA2873-183 US 287 Repairs at LCR 17 03/09/17 0.20 5000.00 6625.00 5600.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 0.10 915.91 10916.62 9300.00 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 0.15 10000.00 10291.32 5200.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 0.90 1000.00 10195.19 12088.58 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 0.10 8000.00 11450.00 6850.00 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 1.00 1000.00 1895.00 925.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 0.10 1000.00 11788.33 25000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 93.54 1012.22 1022.30 891.76 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 143 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00006 Seeding (Native) Acre =================================================== STA006A-057 SH 6 EAST OF STERLING 04/06/17 0.50 850.00 2258.37 2100.00 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 0.02 1000.00 83300.00 83300.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 0.10 1000.00 50152.85 45600.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 14.40 500.00 964.88 943.46 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 15.00 730.00 1109.82 866.25 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 0.20 12000.00 16256.67 16800.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 0.49 1700.00 1672.66 1517.99 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 16.30 750.00 875.00 875.00 STAR400-348 Region 4 Controller and Cabin 05/04/17 0.10 7500.00 5600.00 2800.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 1.30 1000.00 1194.50 840.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 14.40 1000.00 1767.05 2190.00 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 135.00 500.00 227.03 250.00 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 0.20 2500.00 3745.00 6425.00 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 0.30 3000.00 4922.20 15000.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 0.70 3000.00 6660.00 15000.00 MTCE0253-259 I25 FROM MP 229.29 TO MP 244. 06/22/17 0.10 8000.00 5990.00 3100.00 STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 0.29 3000.00 4864.20 2258.00 MTCE142A-002 SH 142 CHIPSEAL 06/22/17 0.10 1500.00 2400.00 2400.00 ER0361-115 US 36 Bridges 06/22/17 5.85 800.00 1138.69 1400.00 ER0341-093 PR US 34 BIG THOMPSON CANYON 06/28/17 0.75 1195.00 1195.00 1195.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 206.10 625.90 817.58 704.15 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 6.00 1000.00 1870.00 1300.00 ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 0.72 800.00 2757.00 3200.00 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 0.01 15000.00 61000.00 65000.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 0.20 4000.00 6000.00 6000.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 1.00 4000.00 1506.67 1100.00 CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 0.10 3000.00 6175.00 8050.00 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 0.10 5000.00 6936.67 6400.00 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 11.00 1500.00 1413.79 1800.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 2.62 1000.00 994.49 849.92 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 1.00 1750.00 883.33 900.00 IM0762-052 FIBER OPTICS AND ITS DEVICES 08/03/17 2.40 1300.00 1487.42 2000.00 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 1.30 902.00 11500.00 3000.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 1.20 723.33 2950.00 1750.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 27.60 365.00 384.00 384.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 11.20 1000.00 653.15 543.00 BRR400-354 Little-T Channel Work and SH NHPP0821-108 SH 82 MP 45 OLVDS 09/07/17 0.20 10000.00 5158.33 2350.00 MPR200-244 REGION 2 FY18 SIGNING PROJECT 09/14/17 0.12 10000.00 1833.33 2500.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 144 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00006 Seeding (Native) Acre =================================================== AQCR100-258 CDOT TSSIP 2016 SIG UPGRADE F 09/21/17 0.10 2000.00 3330.00 3100.00 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 0.10 700.00 19962.86 9200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 66.97 942.22 1173.01 999.04 STA094A-034 Critical Culvert Project on S 10/05/17 0.30 1000.00 3260.79 2500.00 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 0.35 4000.00 7246.67 714.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 1.40 2000.00 1183.67 2365.00 C133A-042 SH 133 McClure Pass Slip 11/16/17 0.60 2000.00 1887.44 2070.00 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 1.00 1200.00 1257.96 900.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 0.50 1500.00 3666.67 3000.00 ITSSW01-831 ITS WEATHER STATION UPGRADES 11/30/17 0.80 5000.00 14359.00 4700.00 ITSSW02-003 ITS FIBER INSTALLATIONS FOR H 11/30/17 0.38 5000.00 2539.00 2375.00 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 5.07 800.00 877.79 446.00 BR3852-018 POA SCOUR US 385 STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 1.00 900.00 2529.17 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 11.40 1623.33 2315.28 1436.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 378.01 807.62 1025.29 821.37 =============== 212-00007 Seeding (Native) (Hydraulic) Acre =================================================== NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 0.50 5000.00 2147.00 289.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 0.50 5000.00 2147.00 289.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 0.50 5000.00 2147.00 289.00 =============== 212-00009 Seeding (Temporary) Acre =================================================== STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 15.00 630.00 395.68 446.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 15.00 630.00 395.68 446.25 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 2.23 750.00 680.54 623.27 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.23 750.00 680.54 623.27 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17.23 645.53 475.09 469.16 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 145 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00011 Seeding (Lawn) Acre =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 0.10 4300.00 8046.40 11000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 0.10 4300.00 8046.40 11000.00 AQC088A-035 Traffic Signal/Fiber Optic In 05/18/17 0.01 20000.00 9309.17 8000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 0.01 20000.00 9309.17 8000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 0.11 5188.68 8090.28 10830.19 =============== 212-00012 Seeding (Furnished) Acre =================================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 21.20 60.00 63.00 63.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 21.20 60.00 63.00 63.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21.20 60.00 63.00 63.00 =============== 212-00022 Seeding (Riparian) Acre =================================================== ER0341-093 PR US 34 BIG THOMPSON CANYON 06/28/17 3.40 4060.00 4060.00 4060.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.40 4060.00 4060.00 4060.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 4.30 1850.00 861.00 861.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 0.87 1500.00 1340.39 750.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.17 1791.10 1191.77 842.32 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 6.00 11000.00 1091.35 900.00 CC0341-100 US 34 BIG THOMPSON CANYON MOO 12/11/17 1.53 1534.69 1587.58 1587.58 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 0.28 3000.00 2832.71 474.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 146 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00022 Seeding (Riparian) Acre =================================================== BR3852-018 POA SCOUR US 385 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 7.81 8858.91 1197.00 1019.43 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.38 5631.99 1367.22 1594.66 =============== 212-00028 Seeding (Wetlands) Acre =================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 0.20 4300.00 9860.00 7700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 0.20 4300.00 9860.00 7700.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 0.02 3000.00 40103.05 36809.14 ER0361-115 US 36 Bridges 06/22/17 0.16 5000.00 5967.63 12000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 0.18 4771.43 8036.44 14835.33 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 0.10 8000.00 15866.67 9000.00 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 0.10 7000.00 37200.00 24400.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 13.30 1850.00 2310.00 2310.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 13.50 1933.70 3110.36 2523.19 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13.88 2003.60 3846.68 2753.09 =============== 212-00032 Soil Conditioning Acre =================================================== NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 0.50 1000.00 2807.31 3000.00 NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 7.00 1200.00 973.50 747.00 NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 16.00 2500.00 925.50 100.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 0.20 3000.00 13522.50 7000.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 38.00 2500.00 2660.29 1875.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 0.23 8000.00 10204.56 4000.00 STA0931-032 SH 93 Erosion Correction 02/09/17 0.45 3500.00 6850.51 5150.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 0.90 5000.00 6097.07 2699.96 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 0.50 3000.00 5394.33 3940.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 2.37 4300.00 3980.00 3500.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 147 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00032 Soil Conditioning Acre =================================================== NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 0.50 6000.00 5400.10 5518.20 SHE160A-031 SH 160 Passing Lanes 03/02/17 9.34 2770.00 3036.97 3794.44 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 0.36 6000.00 8042.00 7500.00 NHPP 0701-230 Midpoint WB Bore 03/02/17 0.84 3000.00 4693.13 7250.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 13.40 3000.00 775.95 495.00 BR0252-449 I-25 Woodmen NB 03/02/17 0.60 2500.00 10812.50 2500.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 0.10 2277.89 18904.99 6000.00 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 0.15 10000.00 20466.53 20500.00 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 0.10 7000.00 15335.00 14550.00 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 1.00 3000.00 4624.00 3500.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 0.10 3000.00 21838.33 52000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 92.64 2645.57 2561.35 1768.59 STA006A-057 SH 6 EAST OF STERLING 04/06/17 0.50 2732.00 3807.34 1100.00 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 0.02 3000.00 137700.00 137700.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 14.40 3000.00 2998.83 2913.15 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 15.00 2700.00 2972.40 2772.00 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 0.20 15000.00 18458.33 19200.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 0.49 3000.00 8703.76 8011.27 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 16.30 1500.00 3800.00 3800.00 STAR400-348 Region 4 Controller and Cabin 05/04/17 0.10 10000.00 5600.00 2800.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 1.30 2800.00 2622.50 2400.00 AQC088A-035 Traffic Signal/Fiber Optic In 05/18/17 0.01 20000.00 15386.67 8000.00 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 32.00 2550.00 3010.74 2780.00 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 0.30 6000.00 8857.00 15000.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 0.70 8000.00 4910.00 10000.00 MTCE0253-259 I25 FROM MP 229.29 TO MP 244. 06/22/17 0.10 10000.00 5990.00 3100.00 STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 0.29 4000.00 7447.20 5400.00 MTCE142A-002 SH 142 CHIPSEAL 06/22/17 0.10 4000.00 6700.00 6700.00 ER0361-115 US 36 Bridges 06/22/17 6.01 3000.00 2636.39 1800.00 ER0341-093 PR US 34 BIG THOMPSON CANYON 06/28/17 6.00 6350.00 6350.00 6350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 93.81 2840.61 3154.43 3319.06 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 6.00 1600.00 4280.00 4600.00 ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 0.72 2700.00 2757.00 3200.00 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 0.01 20000.00 61000.00 65000.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 1.00 6000.00 1713.00 2450.00 CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 0.10 10000.00 6175.00 8050.00 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 0.10 9000.00 3483.33 3550.00 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 11.00 3000.00 1939.81 2124.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 148 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00032 Soil Conditioning Acre =================================================== BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 2.62 2800.00 3082.03 3682.97 IM0762-052 FIBER OPTICS AND ITS DEVICES 08/03/17 2.40 2800.00 2580.58 2300.00 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 1.30 4290.00 13500.00 7000.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 1.20 2658.33 7400.00 2500.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 53.10 5150.00 5410.00 5410.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 11.20 2500.00 2603.48 2610.00 BRR400-354 Little-T Channel Work and SH NHPP0821-108 SH 82 MP 45 OLVDS 09/07/17 0.20 10000.00 8036.00 2333.00 AQCR100-258 CDOT TSSIP 2016 SIG UPGRADE F 09/21/17 0.10 2000.00 8533.33 3100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 91.05 4164.00 3315.44 4416.00 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 0.35 4000.00 6649.50 714.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 1.40 5000.00 3278.67 6940.00 C133A-042 SH 133 McClure Pass Slip 11/16/17 0.60 3000.00 3294.10 5200.00 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 8.00 3000.00 4103.31 3500.00 ITSSW01-831 ITS WEATHER STATION UPGRADES 11/30/17 0.80 6000.00 10158.50 5900.00 ITSSW02-003 ITS FIBER INSTALLATIONS FOR H 11/30/17 0.38 5000.00 2789.00 2375.00 CC0341-100 US 34 BIG THOMPSON CANYON MOO 12/11/17 1.83 2340.01 3070.00 3070.00 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 5.35 2600.00 3314.00 2338.00 BR3852-018 POA SCOUR US 385 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 18.71 3158.32 3995.24 3465.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 296.21 3206.47 3091.35 3277.34 =============== 212-00050 Sod Sq Foot ================================================ STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 300.00 5.00 3.55 3.50 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 29,565.00 1.25 1.63 1.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 29,865.00 1.29 1.65 1.42 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 7,218.00 1.00 0.80 0.80 STAR400-348 Region 4 Controller and Cabin 05/04/17 282.00 2.50 5.00 1.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7,500.00 1.06 1.10 0.81 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 800.00 5.00 5.00 4.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 149 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00050 Sod Sq Foot ================================================ AQCR100-258 CDOT TSSIP 2016 SIG UPGRADE F 09/21/17 412.00 5.00 4.50 3.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,212.00 5.00 4.78 3.83 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 372.00 2.00 2.23 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 372.00 2.00 2.23 4.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 38,949.00 1.37 1.68 1.40 =============== 212-00900 Compost Cubic Yard ============================================= ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 260.00 125.00 39.34 40.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 260.00 125.00 39.34 40.00 CC0341-100 US 34 BIG THOMPSON CANYON MOO 12/11/17 427.00 15.15 15.15 15.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 427.00 15.15 15.15 15.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 687.00 56.72 36.20 24.55 =============== 212-01200 Landscape Restoration LUMP SUM =============================================== SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 1.00 7500.00 13400.00 12700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 7500.00 13400.00 12700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 7500.00 13400.00 12700.00 =============== 213-00000 Mulching Acre =================================================== ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 1.00 1750.00 1775.00 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1750.00 1775.00 2000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1750.00 1775.00 2000.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 150 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00002 Mulching (Weed Free Hay) Acre =================================================== NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 16.00 750.00 1.02 1.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 34.00 750.00 493.26 311.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 0.23 3000.00 7071.62 4000.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 13.40 900.00 360.45 405.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 0.10 748.69 17271.77 7050.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 63.73 789.66 459.86 264.39 STA006A-057 SH 6 EAST OF STERLING 04/06/17 0.50 850.00 2258.37 2100.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 7.50 750.00 828.47 584.84 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 0.20 12000.00 18075.00 18600.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 14.40 800.01 1676.92 962.00 AQC088A-035 Traffic Signal/Fiber Optic In 05/18/17 0.01 10000.00 11235.00 8000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 22.61 886.05 1189.09 1019.95 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 1.30 2695.00 9000.00 5500.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 0.20 625.00 4166.67 5000.00 MPR200-244 REGION 2 FY18 SIGNING PROJECT 09/14/17 0.12 10000.00 750.00 750.00 AQCR100-258 CDOT TSSIP 2016 SIG UPGRADE F 09/21/17 0.10 2000.00 2196.67 850.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.72 2923.55 6950.52 4840.12 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 8.00 2000.00 750.53 550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8.00 2000.00 750.53 550.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 96.06 951.36 797.51 608.90 =============== 213-00003 Mulching (Weed Free) Acre =================================================== NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 7.00 1000.00 1868.16 1836.32 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 0.90 5000.00 2144.59 696.28 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 2.37 4300.00 1125.20 761.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 151 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00003 Mulching (Weed Free) Acre =================================================== NHPP 0701-230 Midpoint WB Bore 03/02/17 0.84 1500.00 1436.83 1650.00 BR0252-449 I-25 Woodmen NB 03/02/17 0.60 1500.00 8500.00 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11.71 2036.81 2070.48 1474.85 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 0.10 1500.00 24826.14 22600.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 14.00 1200.00 540.00 540.00 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 0.20 2000.00 3445.00 4000.00 STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 0.29 2500.00 5534.60 2233.00 ER0361-115 US 36 Bridges 06/22/17 0.05 1500.00 20148.20 37000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 14.64 1239.75 1772.26 896.01 ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 0.72 1000.00 2757.00 3200.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 0.20 40000.00 6000.00 6000.00 CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 0.10 1000.00 6175.00 8050.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 4.85 750.00 869.13 679.93 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.87 2122.23 943.19 1295.85 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 5.35 800.00 1186.29 615.00 BR3852-018 POA SCOUR US 385 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.35 800.00 1186.29 615.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 37.57 1563.44 1341.77 1098.88 =============== 213-00004 Mulching (Weed Free Straw) Acre =================================================== NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 0.50 2000.00 1175.59 1000.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 0.50 550.00 1616.59 1559.58 SHE160A-031 SH 160 Passing Lanes 03/02/17 9.34 595.00 650.51 875.56 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.34 660.76 682.46 914.65 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 0.37 1500.00 2536.71 2310.13 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 152 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00004 Mulching (Weed Free Straw) Acre =================================================== STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 38.00 880.00 444.03 410.00 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 0.30 2000.00 2455.40 600.00 MTCE142A-002 SH 142 CHIPSEAL 06/22/17 0.10 2000.00 1900.00 1900.00 ER0361-115 US 36 Bridges 06/22/17 0.58 2500.00 2101.96 3300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 39.35 921.09 580.97 475.70 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 6.00 1000.00 1300.00 1000.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 8.50 900.00 544.83 415.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 14.50 941.38 728.27 657.07 STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 1.00 650.00 1493.33 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 650.00 1493.33 1000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 65.19 880.15 689.99 593.71 =============== 213-00007 Mulching (Wood Strand) Acre =================================================== STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 1.00 5500.00 1299.60 1200.00 ER0341-093 PR US 34 BIG THOMPSON CANYON 06/28/17 6.00 8265.00 8265.00 8265.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7.00 7870.00 6523.65 7255.71 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 5.70 9700.00 10185.00 10185.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5.70 9700.00 10185.00 10185.00 CC0341-100 US 34 BIG THOMPSON CANYON MOO 12/11/17 0.93 8030.45 7800.00 7800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 0.93 8030.45 7800.00 7800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13.63 8646.24 8031.29 8517.87 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 153 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00011 Mulching (Hydraulic) Acre =================================================== ER0361-115 US 36 Bridges 06/22/17 4.10 2500.00 1175.83 440.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.10 2500.00 1175.83 440.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.10 2500.00 1175.83 440.00 =============== 213-00012 Spray-on Mulch Blanket Acre =================================================== STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 0.40 4000.00 14600.00 5500.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 4.00 3500.00 3270.86 2600.00 STM0243-089 Midpoint: Station 1019+50 Cen STA0931-032 SH 93 Erosion Correction 02/09/17 0.34 4000.00 5760.51 3035.00 STA2873-183 US 287 Repairs at LCR 17 03/09/17 0.20 5000.00 15624.33 20000.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 0.40 3500.00 18086.86 22997.79 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 1.00 4000.00 5530.00 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.34 3684.54 5713.27 5560.14 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 30.00 1.70 2513.00 2835.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 2.00 4000.00 4800.00 4800.00 STAR400-348 Region 4 Controller and Cabin 05/04/17 0.10 12000.00 3950.00 2200.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 1.50 3500.00 3131.25 3100.00 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 3.50 3200.00 3043.23 2810.00 ER0361-115 US 36 Bridges 06/22/17 2.90 3500.00 3062.76 2300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 40.00 896.28 2632.65 2900.63 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 1.00 5000.00 4816.67 3400.00 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 11.00 5000.00 2678.16 2640.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 47.70 4500.00 4950.00 4950.00 NHPP0821-108 SH 82 MP 45 OLVDS 09/07/17 0.20 10000.00 6130.00 7915.00 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 0.10 4000.00 23482.28 5100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 60.00 4617.50 3869.69 4510.80 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 0.69 4000.00 2972.00 5615.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 154 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00012 Spray-on Mulch Blanket Acre =================================================== C133A-042 SH 133 McClure Pass Slip 11/16/17 0.60 5000.00 5024.76 4200.00 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 8.00 4000.00 3074.26 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9.29 4064.59 3241.03 2841.16 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 115.63 3234.64 3285.71 3847.56 =============== 213-00013 Spray-on Mulch Blanket Pound ================================================== NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 1,080.00 10.00 2.46 2.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,080.00 10.00 2.46 2.50 STA094A-034 Critical Culvert Project on S 10/05/17 900.00 4.00 3.57 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 900.00 4.00 3.57 4.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,980.00 7.27 3.06 3.18 =============== 213-00061 Mulch Tackifier Pound ================================================== NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 50.00 6.00 5.82 3.00 NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 700.00 3.00 5.41 5.32 NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 3,282.00 3.00 0.57 0.10 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 6,800.00 2.75 2.34 2.10 STM0243-089 Midpoint: Station 1019+50 Cen NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 23.00 50.00 29.40 10.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 200.00 4.00 4.51 3.48 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 474.00 5.50 3.12 3.25 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 50.00 60.00 7.39 7.96 SHE160A-031 SH 160 Passing Lanes 03/02/17 929.00 3.00 3.28 2.11 NHPP 0701-230 Midpoint WB Bore 03/02/17 168.00 10.00 8.89 9.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 2,680.00 3.00 2.08 2.10 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 20.00 2.61 23.94 3.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15,376.00 3.32 2.52 1.95 STA006A-057 SH 6 EAST OF STERLING 04/06/17 100.00 3.00 11.03 10.50 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 155 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00061 Mulch Tackifier Pound ================================================== STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 30.00 5.00 27.63 25.20 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1,504.00 5.00 2.54 3.20 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 3,000.00 2.50 1.82 3.05 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 30.00 40.00 61.67 60.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 74.00 10.00 6.66 5.97 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 2,800.00 2.75 2.70 2.70 NHPPC120-026 US 85: I-76 to 168th 05/04/17 3,100.00 2.01 3.08 2.40 AQC088A-035 Traffic Signal/Fiber Optic In 05/18/17 20.00 25.00 23.26 30.00 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 9,832.00 2.25 1.95 1.80 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 30.00 11.00 14.39 20.00 STA0072-019 SH 7 FROM US 287 TO 75TH STRE 06/22/17 58.00 8.00 24.54 5.58 MTCE142A-002 SH 142 CHIPSEAL 06/22/17 1.00 6.00 7.00 7.00 ER0361-115 US 36 Bridges 06/22/17 10.00 3.00 15.59 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20,589.00 2.66 2.58 2.54 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 3,000.00 3.00 3.63 3.20 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 30.00 15.00 36.00 36.00 CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 20.00 10.00 41.63 15.00 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 2,200.00 3.00 2.70 3.20 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 970.00 3.00 3.20 2.72 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 200.00 20.00 5.50 6.00 IM0762-052 FIBER OPTICS AND ITS DEVICES 08/03/17 480.00 3.00 4.25 4.00 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 260.00 6.60 81.50 13.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 50.00 2.50 13.17 15.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 1,694.00 3.50 2.04 1.80 BRR400-354 Little-T Channel Work and SH MPR200-244 REGION 2 FY18 SIGNING PROJECT 09/14/17 24.00 25.00 22.67 8.00 AQCR100-258 CDOT TSSIP 2016 SIG UPGRADE F 09/21/17 1.00 500.00 147.33 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8,929.00 3.75 3.69 3.49 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 3,000.00 3.00 2.43 2.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,000.00 3.00 2.43 2.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 47,894.00 3.10 2.89 2.57 =============== 213-00065 Inorg Mulch Cubic Yard ============================================= NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 4.00 70.00 170.00 170.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 70.00 170.00 170.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 70.00 170.00 170.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 156 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00070 Landscape Weed Barr Fabric Sq Yard ================================================ STAR500-190 R5 Signal Replacement Chaffee 04/27/17 59.00 15.00 15.67 12.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 38.00 4.00 3.00 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 97.00 10.69 13.43 8.47 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 97.00 10.69 13.43 8.47 =============== 213-00150 Bonded Fiber Matrix Acre =================================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 20.00 3000.00 2829.57 2400.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 0.50 5000.00 4520.00 3130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.50 3048.78 2865.03 2434.76 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 0.50 5000.00 6086.46 5620.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 0.50 5000.00 6086.46 5620.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21.00 3095.24 2909.47 2579.55 =============== 213-00705 Landscape Boulder (Special) Each =================================================== CC0341-100 US 34 BIG THOMPSON CANYON MOO 12/11/17 134.00 192.37 134.52 134.52 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 134.00 192.37 134.52 134.52 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 134.00 192.37 134.52 134.52 =============== 214-00000 Landscape Maintenance LUMP SUM =============================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 1.00 10000.00 15542.42 10310.00 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 1.00 5000.00 5926.67 1480.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 7500.00 10734.55 5895.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 1.00 30000.01 10035.91 6720.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 157 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 214-00000 Landscape Maintenance LUMP SUM =============================================== ER0361-115 US 36 Bridges 06/22/17 1.00 22500.00 47615.00 18000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 26250.01 35088.64 12360.00 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 1.00 15000.00 8333.60 9000.00 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 1.00 5000.00 9833.33 14000.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 1.00 30000.00 23846.76 17025.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 16666.67 17551.70 13341.67 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 1.00 12000.00 62708.33 55000.00 ITSSW02-003 ITS FIBER INSTALLATIONS FOR H 11/30/17 1.00 5000.00 4538.75 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 8500.00 39440.50 28250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 14944.45 25183.92 14781.67 =============== 214-00001 Landscape Maintenance (2018) LUMP SUM =============================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1.00 126500.00 125000.00 125000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 126500.00 125000.00 125000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 126500.00 125000.00 125000.00 =============== 214-00002 Landscape Maintenance (2019) LUMP SUM =============================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1.00 173000.00 225000.00 225000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 173000.00 225000.00 225000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 173000.00 225000.00 225000.00 =============== 214-00003 Landscape Maintenance (2020) LUMP SUM =============================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1.00 75000.00 125000.00 125000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 75000.00 125000.00 125000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 75000.00 125000.00 125000.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 158 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 214-00004 Landscape Maintenance (Cedar Cove) LUMP SUM =============================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1.00 75000.00 175000.00 175000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 75000.00 175000.00 175000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 75000.00 175000.00 175000.00 =============== 214-00005 Landscape Maintenance (24 Month) LUMP SUM =============================================== NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 1.00 5000.00 11948.00 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 5000.00 11948.00 2000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5000.00 11948.00 2000.00 =============== 214-00145 Plant Protect Fence Lin Foot =============================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1,000.00 5.00 2.40 2.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,000.00 5.00 2.40 2.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,000.00 5.00 2.40 2.65 =============== 214-00155 Plant (B and B) Each =================================================== ER0341-093 PR US 34 BIG THOMPSON CANYON 06/28/17 662.00 40.00 40.00 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 662.00 40.00 40.00 40.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 662.00 40.00 40.00 40.00 =============== 214-00201 Deciduous Tree (Tubeling) Each =================================================== ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 247.00 10.00 12.55 9.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 247.00 10.00 12.55 9.00 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 70.00 25.00 10.33 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 70.00 25.00 10.33 8.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 317.00 13.31 12.26 8.78 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 159 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 214-00210 Deciduous Tree (1 In C) Each =================================================== NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 40.00 250.00 78.26 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 40.00 250.00 78.26 80.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 250.00 78.26 80.00 =============== 214-00215 Deciduous Tree (1.5 In C) Each =================================================== STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 5.00 330.00 1306.50 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 330.00 1306.50 1000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 330.00 1306.50 1000.00 =============== 214-00230 Deciduous Tree (3 In C) Each =================================================== ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 3.00 600.00 672.55 692.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 600.00 672.55 692.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 600.00 672.55 692.00 =============== 214-00280 Deciduous Tree (8 Ft) Each =================================================== ER0361-115 US 36 Bridges 06/22/17 35.00 500.00 460.71 460.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 35.00 500.00 460.71 460.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 35.00 500.00 460.71 460.00 =============== 214-00301 Deciduous Shrub (Tubeling) Each =================================================== ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 649.00 10.00 8.74 8.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 649.00 10.00 8.74 8.00 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 1,360.00 15.00 8.64 8.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,360.00 15.00 8.64 8.70 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,009.00 13.38 8.69 8.47 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 160 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 214-00350 Deciduous Shrub (5 Gal) Each =================================================== ER0361-115 US 36 Bridges 06/22/17 1,105.00 45.00 33.54 24.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,105.00 45.00 33.54 24.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,105.00 45.00 33.54 24.00 =============== 214-00410 Evergreen Tree (1 Gal) Each =================================================== NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 20.00 100.00 36.74 26.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 20.00 100.00 36.74 26.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 100.00 36.74 26.00 =============== 214-00901 Perennials (Tubeling) Each =================================================== CC0341-100 US 34 BIG THOMPSON CANYON MOO 12/11/17 108.00 2.89 3.00 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 108.00 2.89 3.00 3.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 108.00 2.89 3.00 3.00 =============== 214-01010 Brush Layer Cutting Each =================================================== STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 40.00 6.00 5.19 4.56 ER0361-115 US 36 Bridges 06/22/17 1,385.00 5.50 5.83 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,425.00 5.51 5.82 9.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,425.00 5.51 5.82 9.85 =============== 214-01011 Live Brush Mattress Lin Foot =============================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 2,261.00 10.00 26.50 26.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,261.00 10.00 26.50 26.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,261.00 10.00 26.50 26.50 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 161 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 214-01013 Live Willow Stakes Each =================================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 31,619.00 7.45 8.00 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 31,619.00 7.45 8.00 8.00 CC0341-100 US 34 BIG THOMPSON CANYON MOO 12/11/17 441.00 20.00 21.74 21.74 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 441.00 20.00 21.74 21.74 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 32,060.00 7.62 8.19 8.19 =============== 214-01014 Live Willow Brush Each =================================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 30,532.00 7.45 4.00 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 30,532.00 7.45 4.00 4.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30,532.00 7.45 4.00 4.00 =============== 214-01015 Willow Cuttings Each =================================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1,100.00 7.00 5.58 5.79 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 105.00 7.00 4.63 3.50 ER0341-093 PR US 34 BIG THOMPSON CANYON 06/28/17 3,160.00 9.50 9.50 9.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4,365.00 8.81 6.29 8.42 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 350.00 10.00 5.33 6.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 959.00 5.00 3.70 3.50 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,309.00 6.34 3.85 4.17 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,674.00 8.24 5.30 7.44 =============== 214-01018 Live Brush Soil Lift Lin Foot =============================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 10,744.00 5.00 45.00 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10,744.00 5.00 45.00 45.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10,744.00 5.00 45.00 45.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 162 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 214-01019 Single Soil Lift Lin Foot =============================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 2,540.00 5.00 40.00 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,540.00 5.00 40.00 40.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,540.00 5.00 40.00 40.00 =============== 214-01025 Dormant Log Cutting Each =================================================== NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 50.00 60.00 86.83 85.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 50.00 60.00 86.83 85.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 60.00 86.83 85.00 =============== 214-01032 Large Woody Material Each =================================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 341.00 1355.33 1665.00 1665.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 341.00 1355.33 1665.00 1665.00 CC0341-100 US 34 BIG THOMPSON CANYON MOO 12/11/17 20.00 919.12 1600.00 1600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 20.00 919.12 1600.00 1600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 361.00 1331.16 1661.40 1661.40 =============== 214-01225 Inst Plant (Bareroot) Each =================================================== ER0341-093 PR US 34 BIG THOMPSON CANYON 06/28/17 850.00 7.50 7.50 7.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 850.00 7.50 7.50 7.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 850.00 7.50 7.50 7.50 =============== 214-01227 Rootwad Each =================================================== ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 19.00 4000.00 1838.81 300.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 163 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 214-01227 Rootwad Each =================================================== BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 19.00 4000.00 1838.81 300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19.00 4000.00 1838.81 300.00 =============== 214-01229 Wetland Sod Mat Sq Foot ================================================ ER0361-115 US 36 Bridges 06/22/17 6,581.00 10.00 6.17 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6,581.00 10.00 6.17 5.00 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 4,950.00 8.00 6.80 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,950.00 8.00 6.80 7.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,531.00 9.14 6.44 5.86 =============== 214-01401 Nursery Stock Container (DRC #10) Each =================================================== ER0361-115 US 36 Bridges 06/22/17 4,700.00 3.00 3.53 3.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4,700.00 3.00 3.53 3.25 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 7,867.00 4.60 5.00 5.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 4,108.00 4.00 3.86 3.25 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 11,975.00 4.39 4.03 4.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16,675.00 4.00 3.86 4.08 =============== 214-01402 Nursery Stock Container (DRC # 40) Each =================================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 5,792.00 15.00 16.00 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5,792.00 15.00 16.00 16.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,792.00 15.00 16.00 16.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 164 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 214-01403 Nursery Stock Container (DRC # 60) Each =================================================== BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 80.00 45.00 30.63 26.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 80.00 45.00 30.63 26.50 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 2,446.00 15.50 17.00 17.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,446.00 15.50 17.00 17.00 CC0341-100 US 34 BIG THOMPSON CANYON MOO 12/11/17 499.00 9.34 10.00 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 499.00 9.34 10.00 10.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,025.00 15.26 17.27 16.10 =============== 214-01404 Nursery Stock Container (DRC # 180) Each =================================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 206.00 27.50 29.00 29.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 206.00 27.50 29.00 29.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 206.00 27.50 29.00 29.00 =============== 215-00000 Transplant Shrub Each =================================================== NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 10.00 100.00 190.60 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 100.00 190.60 75.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 15.00 200.00 149.03 137.08 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 15.00 200.00 149.03 137.08 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 7.00 800.00 256.67 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7.00 800.00 256.67 200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 32.00 300.00 187.05 131.44 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 165 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 216-00030 Soil Reten Blanket (Spec) Sq Yard ================================================ ER0361-115 US 36 Bridges 06/22/17 2,800.00 4.50 8.19 2.30 ER0341-093 PR US 34 BIG THOMPSON CANYON 06/28/17 5,535.00 12.00 12.00 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8,335.00 9.48 9.13 8.74 CC0341-100 US 34 BIG THOMPSON CANYON MOO 12/11/17 3,019.00 10.10 9.00 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,019.00 10.10 9.00 9.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,354.00 9.65 9.11 8.81 =============== 216-00041 Soil Reten Blanket (S/C) Sq Yard ================================================ STE 0702-357 I-70 West Vail Pass Basin 03/23/17 484.00 5.00 5.65 3.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 484.00 5.00 5.65 3.25 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 240.00 8.00 5.28 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 240.00 8.00 5.28 10.00 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 2,360.00 3.00 3.09 2.51 BR3852-018 POA SCOUR US 385 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,360.00 3.00 3.09 2.51 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,084.00 3.70 3.53 3.21 =============== 216-00042 Soil Retent Blanket (BioD S/C) Sq Yard ================================================ STAR500-190 R5 Signal Replacement Chaffee 04/27/17 385.00 15.00 12.33 11.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 618.00 5.00 4.31 3.92 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,003.00 8.84 7.39 6.64 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,003.00 8.84 7.39 6.64 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 166 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 216-00047 Soil Wrap (Coir and Jute) Sq Yard ================================================ ER0341-093 PR US 34 BIG THOMPSON CANYON 06/28/17 1,350.00 13.50 13.50 13.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,350.00 13.50 13.50 13.50 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 49,672.00 6.25 6.50 6.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 49,672.00 6.25 6.50 6.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 51,022.00 6.44 6.69 6.69 =============== 216-00070 Geocell Confinement Sys Sq Yard ================================================ NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 79.00 30.00 132.00 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 79.00 30.00 132.00 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 79.00 30.00 132.00 50.00 =============== 216-00101 Soil Reten Blanket (S-C)(PhotoD Cl 1) Sq Yard ================================================ NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 400.00 2.00 3.35 3.40 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 730.00 3.00 5.48 3.70 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 968.00 3.03 10.42 5.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,098.00 2.82 7.00 4.36 NHPPC120-026 US 85: I-76 to 168th 05/04/17 1,000.00 5.01 27.06 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,000.00 5.01 27.06 2.00 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 2,470.00 3.70 3.20 3.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,470.00 3.70 3.20 3.25 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 167 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 216-00101 Soil Reten Blanket (S-C)(PhotoD Cl 1) Sq Yard ================================================ NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 100.00 10.00 6.80 5.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 100.00 10.00 6.80 5.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,668.00 3.72 8.71 3.48 =============== 216-00201 Soil Reten Blanket (S-C)(BioD Cl 1) Sq Yard ================================================ STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 970.00 3.00 3.75 4.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 800.00 5.00 2.72 2.30 STM0243-089 Midpoint: Station 1019+50 Cen NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 449.00 5.00 5.39 3.50 IM025A-039 I-25 Critical Culvert at MP 1 02/09/17 1,700.00 2.75 5.63 4.48 STA0931-032 SH 93 Erosion Correction 02/09/17 520.00 3.00 4.69 3.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 3,025.00 2.50 3.10 2.60 SHE160A-031 SH 160 Passing Lanes 03/02/17 14,809.00 2.00 2.76 2.91 STA0362-035 US 36: Strasburg to Byers 03/23/17 773.00 2.50 5.96 5.01 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 23,046.00 2.36 3.16 3.11 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 145.00 2.50 11.60 11.60 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 33,300.00 3.00 2.15 2.04 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 2,000.00 3.00 2.70 2.70 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 1,400.00 3.50 2.14 1.80 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 9,218.00 2.25 2.02 1.86 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 21.00 10.00 24.70 50.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 3,200.00 4.00 4.10 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 49,284.00 2.94 2.22 2.27 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 4,000.00 3.00 3.32 2.25 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 450.00 4.50 4.13 4.25 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 100.00 3.50 7.45 7.75 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 20.00 5.50 15.70 17.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 5,343.00 6.88 4.96 3.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 10,345.00 2.50 2.22 2.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 168 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 216-00201 Soil Reten Blanket (S-C)(BioD Cl 1) Sq Yard ================================================ BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20,258.00 3.81 2.68 2.41 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 1,750.00 2.00 4.35 4.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 3,351.00 3.00 2.30 3.60 C133A-042 SH 133 McClure Pass Slip 11/16/17 310.00 5.00 3.85 5.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 675.00 2.75 9.67 10.00 ITSSW01-831 ITS WEATHER STATION UPGRADES 11/30/17 4,000.00 2.00 4.02 2.00 ITSSW02-003 ITS FIBER INSTALLATIONS FOR H 11/30/17 1,800.00 2.50 3.28 4.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 11,886.00 2.48 3.86 3.66 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 104,474.00 2.93 2.60 2.64 =============== 216-00211 Soil Reten Blanket (Exc)(BioD Cl 1) Sq Yard ================================================ CR100-283 REGION 1 TRAFFIC SIGNAL CONTR 07/20/17 100.00 5.00 8.38 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 100.00 5.00 8.38 6.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 100.00 5.00 8.38 6.00 =============== 216-00221 Soil Reten Blanket (C)(BioD Cl 1) Sq Yard ================================================ CC0341-100 US 34 BIG THOMPSON CANYON MOO 12/11/17 1,000.00 5.45 5.00 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,000.00 5.45 5.00 5.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,000.00 5.45 5.00 5.00 =============== 216-00301 Turf Reinf Mat (Cl 1) Sq Yard ================================================ STA0931-032 SH 93 Erosion Correction 02/09/17 100.00 6.00 14.22 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 100.00 6.00 14.22 18.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 100.00 6.00 14.22 18.00 =============== 216-00302 Turf Reinf Mat (Cl 2) Sq Yard ================================================ C133A-042 SH 133 McClure Pass Slip 11/16/17 310.00 5.00 8.98 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 310.00 5.00 8.98 6.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 310.00 5.00 8.98 6.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 169 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 216-00303 Turf Reinf Mat (Cl 3) Sq Yard ================================================ STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 2,458.00 4.75 4.86 4.48 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,458.00 4.75 4.86 4.48 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 525.00 9.00 11.07 7.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 525.00 9.00 11.07 7.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,983.00 5.50 6.36 5.06 =============== 217-00000 Herbicide Treatment Sq Yard ================================================ STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 23,965.00 0.30 0.04 0.03 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 300.00 1.20 3.36 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 24,265.00 0.31 0.14 0.09 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 400.00 120.00 125.00 125.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 1,801.00 1.00 1.76 2.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,201.00 22.63 4.19 24.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26,466.00 2.17 1.31 2.11 =============== 217-00015 Noxious Weed Management Sq Yard ================================================ STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1,230.00 80.00 3.17 7.72 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,230.00 80.00 3.17 7.72 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,230.00 80.00 3.17 7.72 =============== 217-00020 Herbicide Treatment Hour =================================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 5.00 130.00 181.40 101.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 170 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 217-00020 Herbicide Treatment Hour =================================================== NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 40.00 100.00 68.87 67.60 SHE160A-031 SH 160 Passing Lanes 03/02/17 12.00 143.00 168.49 166.67 BR0252-449 I-25 Woodmen NB 03/02/17 4.00 150.00 271.25 275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 61.00 114.20 127.53 103.43 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 20.00 100.00 115.00 115.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 10.00 150.01 103.36 99.00 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 5.00 142.00 213.00 425.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 35.00 120.29 143.01 154.71 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 12.00 303.00 1090.00 180.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.00 303.00 1090.00 180.00 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 10.00 100.00 304.82 350.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 40.00 120.00 181.40 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 50.00 116.00 209.88 230.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 158.00 130.46 202.90 160.66 =============== 218-00000 Noxious Weed Management LUMP SUM =============================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 1.00 46800.00 75000.00 75000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 46800.00 75000.00 75000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 46800.00 75000.00 75000.00 =============== 240-00000 Wildlife Biologist Hour =================================================== NHPP0702-352 HLT VMS CMS LUS REPLACEMENT 01/05/17 8.00 128.00 185.63 131.25 NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 20.00 150.00 156.45 112.90 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 171 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 240-00000 Wildlife Biologist Hour =================================================== NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 15.00 150.00 126.61 100.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 40.00 85.00 135.34 136.53 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 40.00 100.00 110.33 121.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 8.00 120.00 204.00 125.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 15.00 200.00 119.70 95.88 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 15.00 100.00 227.00 220.00 NHPP 0701-230 Midpoint WB Bore 03/02/17 40.00 150.00 247.65 215.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 40.00 105.04 99.39 100.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 120.00 100.00 168.69 117.94 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 10.00 120.00 166.15 150.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 5.00 285.00 150.97 236.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 376.00 116.92 157.55 133.72 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 16.00 100.00 104.00 104.00 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 8.00 101.00 135.44 125.00 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 20.00 150.00 155.33 156.00 NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 40.00 100.00 90.00 95.00 STRR500-169 R5 US 84 MP 14.67 Priority Cu 04/27/17 40.00 115.00 103.24 79.72 NHPPC120-026 US 85: I-76 to 168th 05/04/17 120.00 100.01 89.83 95.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 60.00 100.00 108.07 100.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 40.00 150.00 111.63 50.00 ER0361-115 US 36 Bridges 06/22/17 226.00 105.00 91.25 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 570.00 108.31 96.51 96.09 ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 30.00 120.00 172.50 145.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 40.00 120.00 115.00 115.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 40.00 110.00 124.67 200.00 ITS0761-227 ITS FIBER OPTICS ON I76 DENVE 07/27/17 120.00 100.00 153.32 140.00 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 20.00 143.00 257.50 165.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 250.00 110.64 153.72 148.20 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 36.00 100.00 154.67 200.00 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 20.00 120.00 132.02 120.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 120.00 120.00 140.62 120.00 MTCE092A-027 MTCE R3 FY18 SH 92 STR I-06-A 12/07/17 10.00 105.00 206.67 270.00 NHPP006A-059 US 6 CLEAR CREEK CANYON SH 93 12/14/17 80.00 125.00 124.33 123.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 266.00 118.23 140.68 137.37 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,462.00 112.73 127.38 122.19 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 172 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 240-00001 Wildlife Biologist Day ==================================================== NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 25.00 500.00 985.00 985.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 25.00 500.00 985.00 985.00 C0702-372 I-70 GWC Rockfall Fence Impro 10/12/17 5.00 1000.00 928.75 950.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 2.00 500.00 588.67 765.00 C133A-042 SH 133 McClure Pass Slip 11/16/17 2.00 500.00 1210.42 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 9.00 777.78 1005.82 1031.11 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 34.00 573.53 996.69 997.21 =============== 240-00010 Rem of Nests Hour =================================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 100.00 90.00 113.19 100.00 STM0243-089 Midpoint: Station 1019+50 Cen IM025A-039 I-25 Critical Culvert at MP 1 02/09/17 8.00 100.00 181.33 247.80 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 40.00 115.00 89.67 101.00 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 10.00 120.00 219.40 102.00 SHE160A-031 SH 160 Passing Lanes 03/02/17 10.00 100.00 241.97 138.89 NHPP 0701-230 Midpoint WB Bore 03/02/17 40.00 120.00 132.13 145.00 BR0252-449 I-25 Woodmen NB 03/02/17 24.00 100.00 116.75 95.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 40.00 105.45 81.31 72.00 ER0341-089 PR US 34 Big Thompson Canyon 03/17/17 5.00 149.00 149.00 149.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 120.00 115.00 176.88 112.04 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 10.00 145.00 155.92 113.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 407.00 108.14 140.29 111.24 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 16.00 120.00 99.00 99.00 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 80.00 110.00 79.10 67.30 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 10.00 100.00 149.48 132.00 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 8.00 120.00 174.00 222.00 NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 40.00 120.00 105.00 200.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 20.00 90.00 135.00 135.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 120.00 100.01 86.32 90.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 60.00 45.00 130.47 96.00 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 10.00 105.00 135.80 83.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 173 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 240-00010 Rem of Nests Hour =================================================== NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 40.00 150.00 86.19 50.00 ER0361-115 US 36 Bridges 06/22/17 44.00 100.00 76.95 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 448.00 101.41 100.04 101.42 ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 10.00 105.00 167.50 135.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 40.00 120.00 78.00 78.00 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 40.00 110.00 118.00 190.00 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 20.00 99.00 217.50 85.00 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 20.00 120.00 91.46 131.39 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 10.00 75.00 150.00 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 140.00 109.86 125.23 127.84 STA094A-034 Critical Culvert Project on S 10/05/17 20.00 100.00 77.47 70.00 C0702-372 I-70 GWC Rockfall Fence Impro 10/12/17 8.00 150.00 253.75 260.00 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 36.00 100.00 137.17 200.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 40.00 120.00 121.80 90.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 8.00 125.00 148.33 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 112.00 112.50 121.57 134.64 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,107.00 106.07 119.64 111.75 =============== 240-00020 Netting Sq Yard ================================================ NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 800.00 10.00 12.15 14.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 500.00 10.00 10.59 6.00 STM0243-089 Midpoint: Station 1019+50 Cen SHE160A-031 SH 160 Passing Lanes 03/02/17 10.00 10.00 116.94 161.11 NHPP 0701-230 Midpoint WB Bore 03/02/17 560.00 10.00 14.98 16.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,870.00 10.00 14.19 14.54 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 942.00 30.00 10.27 9.32 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 50.00 75.00 28.62 7.17 NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 200.00 15.00 20.36 34.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 174 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 240-00020 Netting Sq Yard ================================================ NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 750.00 8.00 18.00 18.00 ER0361-115 US 36 Bridges 06/22/17 900.00 13.00 7.70 4.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,842.00 18.55 11.33 11.85 ER012A-047 P-17-L Scour Critical SH 12 a 08/24/17 13.00 8.00 95.33 123.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 500.00 21.34 20.00 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 513.00 21.00 25.45 22.61 STA094A-034 Critical Culvert Project on S 10/05/17 225.00 10.00 8.01 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 225.00 10.00 8.01 8.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,450.00 15.49 12.29 13.58 =============== 240-00100 Prairie Dog Mgmt LUMP SUM =============================================== ITSSW01-834 ITS CAMERA PROJECT FY17 07/13/17 1.00 2000.00 6175.00 11850.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 2000.00 6175.00 11850.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 2000.00 6175.00 11850.00 =============== 250-00010 Envir Health/Safety Mngmt LUMP SUM =============================================== NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 1.00 3500.00 6444.00 5388.00 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 1.00 5000.00 4736.67 5410.00 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 1.00 6000.00 17540.00 12000.00 NHPP 0701-230 Midpoint WB Bore 03/02/17 1.00 5000.00 5170.50 5335.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 1.00 3500.00 4117.20 3400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 4600.00 8634.02 6306.60 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 1.00 5000.00 4812.24 4406.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 175 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 250-00010 Envir Health/Safety Mngmt LUMP SUM =============================================== STAR500-190 R5 Signal Replacement Chaffee 04/27/17 1.00 6000.00 5441.67 4200.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 1.00 5000.00 10000.00 10000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 5333.33 5254.49 6202.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 1.00 8500.00 2600.00 2600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 8500.00 2600.00 2600.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 1.00 5000.00 5418.67 6255.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 1.00 10000.00 6972.80 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 7500.00 6390.00 4377.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 5681.82 6775.48 5590.36 =============== 250-00050 Monitoring Technician Hour =================================================== NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 8.00 110.00 115.69 121.38 NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 10.00 120.00 213.49 380.00 NHPP 0701-230 Midpoint WB Bore 03/02/17 50.00 100.00 147.75 120.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 80.00 75.00 97.51 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 148.00 88.38 119.42 113.32 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 40.00 75.00 89.37 82.00 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 80.00 100.00 105.33 116.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 20.00 100.00 115.00 115.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 140.00 92.86 95.24 106.14 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 12.00 95.00 85.00 85.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.00 95.00 85.00 85.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 176 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 250-00050 Monitoring Technician Hour =================================================== SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 50.00 100.00 135.33 305.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 50.00 100.00 135.33 305.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 350.00 92.06 108.19 136.86 =============== 250-00100 Environmental Health and Safety LUMP SUM =============================================== NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 1.00 6000.00 6187.70 4800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 6000.00 6187.70 4800.00 NHPP 0703-431 CLEAR CREEK ECOLOGIC RESTORAT 11/30/17 1.00 3500.00 4869.69 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 3500.00 4869.69 2500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 4750.00 5309.02 3650.00 =============== 250-00110 Health and Safety Officer Hour =================================================== NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 5.00 200.00 233.66 390.00 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 20.00 200.00 307.00 220.00 NHPP 0701-230 Midpoint WB Bore 03/02/17 50.00 110.00 265.24 120.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 80.00 100.00 121.69 105.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 155.00 119.35 193.05 133.87 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 40.00 100.00 113.42 102.00 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 10.00 120.00 169.67 204.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 20.00 120.00 130.00 130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 70.00 108.57 117.23 124.57 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 4.00 120.00 115.00 115.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 177 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 250-00110 Health and Safety Officer Hour =================================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 80.00 87.14 80.00 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 84.00 88.70 81.67 81.67 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 50.00 120.00 157.00 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 50.00 120.00 157.00 350.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 359.00 110.17 152.32 149.94 =============== 250-00120 Material Sampling and Delivery Each =================================================== NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 2.00 600.00 353.25 106.50 NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 5.00 200.00 439.74 235.00 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 4.00 100.00 582.00 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11.00 236.36 503.82 198.91 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 5.00 100.00 196.47 111.00 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 5.00 300.00 377.67 414.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 200.00 232.71 262.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21.00 219.05 325.46 229.19 =============== 250-00200 Material Handling (Stockpile) Cubic Yard ============================================= NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 10.00 125.00 113.75 102.50 NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 1.00 80.00 1980.10 1125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11.00 120.91 357.19 195.45 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 50.00 50.00 58.98 397.00 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 12.00 200.00 98.33 120.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 50.00 35.00 30.50 30.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 112.00 59.38 58.97 203.71 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 178 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 250-00200 Material Handling (Stockpile) Cubic Yard ============================================= SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 555.00 35.00 15.17 29.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 555.00 35.00 15.17 29.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 678.00 40.42 31.14 60.97 =============== 250-00210 Solid Waste Disposal Cubic Yard ============================================= NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 10.00 500.00 302.85 105.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10.00 500.00 302.85 105.70 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 50.00 50.00 59.32 35.00 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 12.00 1000.00 178.33 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 62.00 233.87 66.06 51.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 72.00 270.83 73.28 58.99 =============== 250-00220 Hazardous Waste Disposal Cubic Yard ============================================= NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 1.00 300.00 2563.43 1275.00 NHPP 0701-230 Midpoint WB Bore 03/02/17 1.00 500.00 2666.33 605.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 400.00 2614.88 940.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 50.00 750.00 211.32 21.14 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 12.00 2000.00 318.00 164.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 50.00 100.00 37.25 37.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 112.00 593.75 204.23 43.64 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 555.00 100.00 11.57 19.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 555.00 100.00 11.57 19.70 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 669.00 183.56 74.27 26.46 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 179 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-01000 ABC (CL 1) Ton ==================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 519.00 25.00 41.05 24.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 519.00 25.00 41.05 24.00 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 14.36 200.00 145.83 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 14.36 200.00 145.83 75.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 533.36 29.71 43.32 25.37 =============== 304-01005 ABC (CL 1) Cubic Yard ============================================= NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 8.00 260.00 272.67 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 260.00 272.67 200.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 2,159.00 36.00 40.67 58.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,159.00 36.00 40.67 58.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,167.00 36.83 41.52 58.52 =============== 304-02000 ABC (CL 2) Ton ==================================================== NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 1,311.00 45.00 42.61 41.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,311.00 45.00 42.61 41.00 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 2,691.00 18.00 24.05 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,691.00 18.00 24.05 16.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,002.00 26.84 31.57 24.19 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 180 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-03000 ABC (CL 3) Ton ==================================================== NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 12,221.00 18.00 19.00 19.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12,221.00 18.00 19.00 19.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12,221.00 18.00 19.00 19.00 =============== 304-03005 ABC (CL 3) Cubic Yard ============================================= STRR300-228 SH 13 R3 VARIOUS CHIP SEALS 11/30/17 2,182.00 30.00 48.38 38.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,182.00 30.00 48.38 38.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,182.00 30.00 48.38 38.50 =============== 304-03006 ABC (CL 3) (Spec) Ton ==================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 25.00 20.00 67.60 19.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 25.00 20.00 67.60 19.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25.00 20.00 67.60 19.00 =============== 304-04000 ABC (CL 4) Ton ==================================================== ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 600.00 30.00 42.57 30.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 600.00 30.00 42.57 30.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 600.00 30.00 42.57 30.00 =============== 304-06000 ABC (CL 6) Ton ==================================================== NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 11.60 100.00 60.32 46.00 NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 20.00 100.00 108.92 115.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 14,656.00 30.00 25.92 25.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 246.00 50.00 62.27 45.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 181 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-06000 ABC (CL 6) Ton ==================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 13,419.00 25.00 35.11 25.30 SHE160A-031 SH 160 Passing Lanes 03/02/17 10,617.00 27.00 26.42 24.92 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 236.00 50.00 89.00 60.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 41,377.00 24.00 19.42 20.00 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 346.00 35.00 72.25 54.00 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 126.00 20.00 95.20 150.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 600.00 60.00 39.10 29.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 81,654.60 26.12 24.99 22.78 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 64.00 30.00 58.40 58.40 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 78.00 20.00 168.61 160.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 22,531.43 20.00 22.94 22.51 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 1,115.00 70.00 66.33 58.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 6,458.00 28.00 28.00 28.00 STMR200-240 REGION WIDE EROSION CONTROL 06/01/17 2.00 200.00 93.25 93.20 ER0361-115 US 36 Bridges 06/22/17 4,157.00 25.00 32.07 34.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 34,405.43 23.76 24.35 26.46 MTCE0762-054 REGION 4 MTCE SECT1 I76 FORT 07/06/17 10.00 50.00 255.42 100.00 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 1,081.00 15.00 28.65 23.00 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 160.00 45.00 51.00 37.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 49.00 17.00 38.00 38.00 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 80.00 80.00 161.67 50.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 152.00 40.00 71.40 96.32 NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 36.60 35.00 62.50 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,568.60 24.55 46.92 35.08 C133A-042 SH 133 McClure Pass Slip 11/16/17 961.00 60.00 63.19 38.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 500.00 15.00 90.20 70.00 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 5.39 200.00 202.91 150.00 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 5.00 200.00 245.74 214.17 BR3852-018 POA SCOUR US 385 STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 769.00 35.00 46.33 37.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,240.39 42.03 63.13 45.46 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 119,869.02 25.72 25.73 24.57 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 182 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-06007 ABC (CL 6) Cubic Yard ============================================= NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 302.00 75.00 51.70 70.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 1,510.00 30.00 51.25 25.00 IM025A-039 I-25 Critical Culvert at MP 1 02/09/17 162.00 40.00 58.25 45.76 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 244.00 25.00 133.66 130.69 NHPP 0701-230 Midpoint WB Bore 03/02/17 15.00 90.00 53.83 54.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 3.00 280.00 454.67 200.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 61.00 30.45 101.66 46.00 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 1,808.00 30.00 62.50 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,105.00 33.82 61.69 53.58 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 840.00 50.00 56.37 37.11 STAR400-348 Region 4 Controller and Cabin 05/04/17 6.00 125.00 160.00 225.00 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 27.00 60.00 128.50 150.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 1,416.00 32.00 61.59 65.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 187.00 80.00 132.63 70.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,476.00 42.26 67.93 57.23 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 1,781.00 54.00 64.02 60.00 ER0141-028 PR SH 14 REPAIR WEST OF RUSTI 07/27/17 85.00 50.00 93.33 100.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 1,773.00 60.00 53.51 40.00 BRR400-354 Little-T Channel Work and SH SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 606.00 35.00 56.80 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,245.00 53.71 56.22 51.02 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 250.00 60.00 39.00 48.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 1,648.00 49.00 44.17 64.50 STRR300-228 SH 13 R3 VARIOUS CHIP SEALS 11/30/17 836.00 70.00 62.50 70.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 20.00 60.00 80.67 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,754.00 56.45 51.05 64.57 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13,580.00 46.17 58.48 55.67 =============== 304-06008 ABC (CL 6) (Spec) Cubic Yard ============================================= STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 588.00 40.00 74.25 17.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 588.00 40.00 74.25 17.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 183 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-06008 ABC (CL 6) (Spec) Cubic Yard ============================================= STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 13,540.00 25.00 13.96 3.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 13,540.00 25.00 13.96 3.30 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 164.00 70.00 63.73 53.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 164.00 70.00 63.73 53.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14,292.00 26.13 17.18 4.43 =============== 304-06009 ABC (CL 6) (Spec) Ton ==================================================== NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 74.00 60.00 66.49 65.00 SHE160A-031 SH 160 Passing Lanes 03/02/17 277.00 32.00 34.70 32.64 STA2873-183 US 287 Repairs at LCR 17 03/09/17 165.00 50.00 58.00 54.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 516.00 41.77 43.37 44.11 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 166.00 50.00 72.75 50.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 166.00 50.00 72.75 50.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 682.00 43.77 46.11 45.67 =============== 304-06011 ABC (CL 6)(Spec)(Install Only) Cubic Yard ============================================= ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 20,543.00 34.08 50.00 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20,543.00 34.08 50.00 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20,543.00 34.08 50.00 50.00 =============== 304-07000 ABC (CL 7) Ton ==================================================== NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 6,053.00 20.00 26.67 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6,053.00 20.00 26.67 25.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 184 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-07000 ABC (CL 7) Ton ==================================================== STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 6,367.00 25.00 29.06 22.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6,367.00 25.00 29.06 22.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12,420.00 22.56 28.07 23.72 =============== 304-07005 ABC (CL 7) Cubic Yard ============================================= C133A-042 SH 133 McClure Pass Slip 11/16/17 19.00 90.00 167.56 71.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 19.00 90.00 167.56 71.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19.00 90.00 167.56 71.00 =============== 304-07009 ABC (CL 7) (Spec) Ton ==================================================== STA006A-057 SH 6 EAST OF STERLING 04/06/17 4,214.00 20.00 23.63 23.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4,214.00 20.00 23.63 23.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,214.00 20.00 23.63 23.75 =============== 304-08000 ABC (Shoulder Material) Ton ==================================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 8,470.00 20.00 26.41 22.00 STM0243-089 Midpoint: Station 1019+50 Cen STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 3,851.00 30.00 35.29 28.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12,321.00 23.13 29.45 24.91 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12,321.00 23.13 29.45 24.91 =============== 304-08002 ABC (Shoulder Material) Cubic Yard ============================================= STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 1,781.00 30.00 37.80 44.41 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,781.00 30.00 37.80 44.41 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 185 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-08002 ABC (Shoulder Material) Cubic Yard ============================================= IM025A-037 I25 S. Trinidad Resurface and 11/30/17 1,260.00 35.00 36.63 41.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,260.00 35.00 36.63 41.90 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,041.00 32.07 37.32 43.37 =============== 304-09000 ABC (Spec) Cubic Yard ============================================= STA0362-035 US 36: Strasburg to Byers 03/23/17 606.00 20.00 97.05 59.99 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 606.00 20.00 97.05 59.99 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 620.00 20.00 51.55 44.66 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 620.00 20.00 51.55 44.66 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,226.00 20.00 74.04 52.24 =============== 304-09006 ABC (Spec) Sq Yard ================================================ STAR500-190 R5 Signal Replacement Chaffee 04/27/17 59.00 60.00 54.00 52.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 59.00 60.00 54.00 52.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 59.00 60.00 54.00 52.00 =============== 304-09014 ABC (Spec) Ton ==================================================== NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 6,857.00 20.00 30.15 23.21 SHE160A-031 SH 160 Passing Lanes 03/02/17 1,626.00 35.00 29.16 32.64 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 5,005.00 29.00 26.61 27.00 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 464.00 50.00 76.45 51.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 13,952.00 25.97 30.25 26.59 ER0361-115 US 36 Bridges 06/22/17 3.00 30.00 154.75 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 30.00 154.75 60.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 186 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-09014 ABC (Spec) Ton ==================================================== NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 222.00 15.00 48.10 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 222.00 15.00 48.10 35.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14,177.00 25.80 30.60 26.73 =============== 304-09100 ABC (RAP) Ton ==================================================== NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 112.70 80.00 65.50 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 112.70 80.00 65.50 80.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 112.70 80.00 65.50 80.00 =============== 306-01000 Reconditioning Sq Yard ================================================ STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 11,174.00 5.00 2.63 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11,174.00 5.00 2.63 2.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,174.00 5.00 2.63 2.00 =============== 307-00000 Hydrated Lime Ton ==================================================== NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 692.00 200.00 211.06 211.59 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 878.00 300.00 256.09 273.28 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 1,118.00 250.00 261.13 276.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,688.00 253.46 248.37 258.74 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,688.00 253.46 248.37 258.74 =============== 310-00608 Full Depth Reclam. of HMA Pvmt (0-8 in.) Sq Yard ================================================ STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 168,437.00 1.00 2.52 1.46 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 168,437.00 1.00 2.52 1.46 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 168,437.00 1.00 2.52 1.46 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 187 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 310-00610 Full Depth Reclam. of HMA Pvmt (8-12 in) Sq Yard ================================================ STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 151,070.00 3.50 3.17 2.25 STM0243-089 Midpoint: Station 1019+50 Cen STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 68,747.00 3.30 2.47 2.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 219,817.00 3.44 2.90 2.51 STA006A-057 SH 6 EAST OF STERLING 04/06/17 296,674.00 2.80 1.66 1.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 296,674.00 2.80 1.66 1.90 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 516,491.00 3.07 2.39 2.10 =============== 403-00720 HMA (Patching) (Asph) Ton ==================================================== NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 15.30 400.00 316.25 350.00 NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 71.00 175.00 363.68 225.00 NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 793.00 125.00 142.15 150.00 NHPP5502-093 US 160/550 PCCP DIAMOND GRIND 01/19/17 5.00 500.00 380.74 265.00 STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 100.00 150.00 225.00 200.00 STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 400.00 175.00 161.76 155.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP145A-063 SH 145 Wall Failure MP 76.05 02/09/17 446.00 300.00 267.27 250.00 STA0931-032 SH 93 Erosion Correction 02/09/17 1.00 750.00 991.00 805.00 STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 212.00 250.00 469.85 462.76 NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 286.00 150.00 188.40 190.00 SHE160A-031 SH 160 Passing Lanes 03/02/17 100.00 170.00 243.13 200.00 NHPP5502-087 US 550 Cribwell Repair MM 68. 03/02/17 432.00 300.00 337.00 275.00 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 500.00 170.00 161.65 130.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 306.30 163.00 313.33 540.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 1,000.00 175.00 157.64 150.00 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 500.00 165.00 212.00 150.00 STA0362-035 US 36: Strasburg to Byers 03/23/17 215.00 180.00 224.63 200.00 STE 0702-357 I-70 West Vail Pass Basin 03/23/17 50.00 200.00 402.65 325.00 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 145.00 150.00 253.20 205.00 SHER100-246 FY17 R1 Traffic Signal Replac 03/30/17 50.00 195.00 275.00 265.00 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 105.00 150.00 191.50 176.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,732.60 186.76 224.70 211.88 STA006A-057 SH 6 EAST OF STERLING 04/06/17 100.00 165.00 170.87 165.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 188 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-00720 HMA (Patching) (Asph) Ton ==================================================== STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 30.00 215.00 174.00 174.00 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 150.00 225.00 388.46 410.00 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 597.00 150.00 159.48 133.43 NHPP0703-433 EJMT S Bore Barrier, Handrail 04/13/17 20.00 220.00 652.41 250.00 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 20.00 183.00 229.18 175.00 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 100.00 250.00 250.43 275.00 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 472.00 175.00 242.65 236.25 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 975.00 150.00 150.33 156.00 NHPP0704-240 Package C (I-70 and I-25) Bri 04/27/17 50.00 200.00 300.00 275.00 NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 237.00 220.00 150.00 150.00 STAR400-348 Region 4 Controller and Cabin 05/04/17 3.20 400.00 305.00 200.00 NHPPC120-026 US 85: I-76 to 168th 05/04/17 175.00 200.00 233.00 260.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 26.00 215.00 301.88 320.00 STA0061-091 SH 6 CHIPSEAL NEAR FLEMING 06/15/17 50.00 180.00 235.00 220.00 NHPP145A-074 SH 145 SAWPIT DEBRIS FLOW 06/15/17 40.00 240.00 403.60 300.00 ER0361-115 US 36 Bridges 06/22/17 159.00 200.00 206.63 220.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,204.20 175.57 213.72 194.82 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 1,320.00 150.00 166.00 140.00 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 200.00 150.00 155.00 110.00 NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 100.00 200.00 260.00 260.00 SHE0141-024 SH 14 Poudre Canyon Guardrail 07/20/17 59.00 200.00 443.33 280.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 10.00 250.00 383.65 283.31 CR100-292 I25/ORCHARD EMERGENCY REPAIR 08/21/17 12.00 1.00 386.17 420.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 676.00 202.04 210.00 210.00 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 300.00 175.00 167.82 153.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,677.00 168.62 176.82 166.25 CR100-286 R1 CURB RAMPS-PH 1 10/26/17 10.00 200.00 200.00 180.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 56.00 200.00 192.00 275.00 C133A-042 SH 133 McClure Pass Slip 11/16/17 20.00 300.00 369.70 250.00 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 1,500.00 250.00 176.40 135.00 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 462.00 195.50 149.46 128.37 NHPP006A-059 US 6 CLEAR CREEK CANYON SH 93 12/14/17 10.00 400.00 928.73 1181.20 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 6.90 250.00 292.50 300.00 STA050A-027 US 50C Storm Sewer 21st LANE 12/21/17 822.00 280.00 190.83 97.00 FSA0361-122 I-70 at Limon, US 40, US 287, 12/21/17 100.00 200.00 300.00 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,986.90 247.88 184.61 134.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14,600.70 193.48 204.27 183.61 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 189 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-00721 HMA (Patching) (Asph) Sq Yard ================================================ NHPP1602-155 US 160 Wolf Creek Fiber Optic 01/19/17 4,543.00 50.00 58.36 66.71 NHPP 0701-230 Midpoint WB Bore 03/02/17 16,500.00 25.00 30.06 24.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 21,043.00 30.40 34.45 33.61 STAR500-190 R5 Signal Replacement Chaffee 04/27/17 257.00 120.00 77.00 76.00 STR050A-031 Storm Sewer on US 50C at Jame 06/08/17 1,180.00 50.00 43.12 39.00 NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 561.00 225.00 214.88 115.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,998.00 108.14 89.28 65.10 NHPPR100-242 R1 CRITICAL CULV REPAIR FY 17 08/17/17 16.00 400.00 325.00 230.00 SHE0831-119 SH83 LIGHTING: DAYTON TO MISS 09/21/17 40.00 66.00 230.00 145.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 56.00 161.43 243.10 169.29 ITSSW01-636 VMS AND LUS UPGRADE FY 17 10/19/17 617.00 100.00 132.71 64.82 STRR300-228 SH 13 R3 VARIOUS CHIP SEALS 11/30/17 4,363.00 20.00 42.94 33.75 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 2,068.00 70.00 32.17 34.83 ERR400-328 SH 52, SH 6, SH 63, SH 55, SH 12/21/17 70.00 200.00 143.81 100.17 BR3852-018 POA SCOUR US 385 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 7,118.00 43.23 51.39 37.41 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30,215.00 38.80 45.27 36.84 =============== 403-00800 Emerg Pothole Rep Ton ==================================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 15.00 275.00 894.88 750.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 10.00 310.20 1066.31 785.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 25.00 289.08 975.55 764.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25.00 289.08 975.55 764.00 =============== 403-09210 SMA Ton ==================================================== ER0361-115 US 36 Bridges 06/22/17 317.00 150.00 208.42 255.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 317.00 150.00 208.42 255.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 317.00 150.00 208.42 255.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 190 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-09221 SMA (Fibers)(Asph) Ton ==================================================== NHPPC120-026 US 85: I-76 to 168th 05/04/17 30,924.00 100.00 107.83 103.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 10,166.00 100.00 131.28 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 41,090.00 100.00 114.98 107.21 NHPP0252-447 I-25: MILE POST 194.04 TO MIL 11/30/17 64,825.00 123.00 116.81 97.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 64,825.00 123.00 116.81 97.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 105,915.00 114.08 116.28 101.11 =============== 403-09500 Furnish HMA Ton ==================================================== STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 2,658.00 100.00 87.96 85.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,658.00 100.00 87.96 85.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,658.00 100.00 87.96 85.00 =============== 403-32851 HMA (Gr SG) (100) (PG 64-28) Ton ==================================================== CR100-292 I25/ORCHARD EMERGENCY REPAIR 08/21/17 150.00 1.00 280.88 295.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 150.00 1.00 280.88 295.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 150.00 1.00 280.88 295.00 =============== 403-33721 HMA (Gr S) (75) (PG 58-28) Ton ==================================================== ER0361-115 US 36 Bridges 06/22/17 2,998.00 90.00 93.58 96.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,998.00 90.00 93.58 96.00 ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 20,033.00 83.57 92.00 92.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20,033.00 83.57 92.00 92.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 23,031.00 84.41 92.75 92.52 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 191 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-33741 HMA (Gr S) (75) (PG 64-22) Ton ==================================================== STA0362-035 US 36: Strasburg to Byers 03/23/17 751.00 87.00 121.25 99.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 751.00 87.00 121.25 99.60 BR0361-117 US 36 Culvert Repair MP 11.95 05/04/17 52.00 150.00 293.00 285.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 52.00 150.00 293.00 285.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 803.00 91.08 135.77 111.61 =============== 403-33751 HMA (Gr S) (75) (PG 64-28) Ton ==================================================== STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 46,722.00 72.00 72.92 61.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 46,722.00 72.00 72.92 61.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 46,722.00 72.00 72.92 61.00 =============== 403-33841 HMA (Gr S) (100) (PG 64-22) Ton ==================================================== STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 122.00 98.15 125.52 98.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 122.00 98.15 125.52 98.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 122.00 98.15 125.52 98.00 =============== 403-34651 HMA (Gr SX) (50) (PG 64-28) Ton ==================================================== ER0341-090 PR US 34 BIG THOMPSON CANYON 09/01/17 54,822.00 88.76 98.00 98.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 54,822.00 88.76 98.00 98.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 54,822.00 88.76 98.00 98.00 =============== 403-34701 HMA (Gr SX) (75) Ton ==================================================== STR0092-023 SH 9 NORTH MP 101.6 TO 107, U 02/09/17 34,387.00 80.00 76.11 82.33 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 192 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-34701 HMA (Gr SX) (75) Ton ==================================================== NHPP0402-091 US 40 WEST OF STEAMBOAT SPRIN 03/02/17 24,338.00 55.00 63.90 63.00 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 34,860.00 55.00 61.08 56.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 93,585.00 64.19 66.83 67.50 IM0701-212 I-70 EXIT 49 GRAND MESA 07/20/17 1,816.00 75.00 93.67 76.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,816.00 75.00 93.67 76.00 SHE340A-018 SH 340 REDLANDS PARKWAY ROUND 11/09/17 4,043.00 75.00 53.67 80.00 C133A-042 SH 133 McClure Pass Slip 11/16/17 322.00 150.00 172.00 300.00 MTCE092A-027 MTCE R3 FY18 SH 92 STR I-06-A 12/07/17 138.00 190.00 272.67 318.00 NHPP0702-354 I-70 EAST SIDE VAIL PASS MP 1 12/07/17 40,293.00 85.00 68.69 72.43 STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 25,958.00 65.00 67.25 53.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 70,754.00 77.59 68.75 67.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 166,155.00 70.01 67.99 67.48 =============== 403-34721 HMA (Gr SX) (75) (PG 58-28) Ton ==================================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 4,794.00 85.00 91.02 86.00 STM0243-089 Midpoint: Station 1019+50 Cen NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 31,118.00 75.00 77.17 70.60 SHE160A-031 SH 160 Passing Lanes 03/02/17 7,409.00 98.00 100.62 99.44 NHPP0703-434 I-70 EBND MSE WALL/GUARDRAIL 03/23/17 84.00 120.00 216.92 176.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 43,405.00 80.12 87.07 76.93 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 43,405.00 80.12 87.07 76.93 =============== 403-34724 HMA (GrSX)(75)(PG 58-28)(4 In) Sq Yard ================================================ STM0243-089 Midpoint: Station 1019+50 Cen . 65,444.00 19.00 16.47 . STM0243-089 Midpoint: Station 1019+50 Cen -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 65,444.00 19.00 16.47 . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 65,444.00 19.00 16.47 . COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 193 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-34741 HMA (Gr SX) (75) (PG 64-22) Ton ==================================================== STA2873-183 US 287 Repairs at LCR 17 03/09/17 3,619.00 87.00 103.33 85.00 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 23,652.00 70.00 83.67 72.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 27,271.00 72.26 85.32 73.73 NHPPR100-291 I-225 SB RESTRIPING I-25 TO Y 08/31/17 19.10 100.00 382.50 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 19.10 100.00 382.50 300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 27,290.10 72.28 85.41 73.88 =============== 403-34751 HMA (Gr SX) (75) (PG 64-28) Ton ==================================================== STA060A-019 SH 60 Resurfacing US 287 to M 01/19/17 35,728.00 77.00 92.25 72.00 SHE160A-031 SH 160 Passing Lanes 03/02/17 7,397.00 75.00 105.80 89.17 STA0853-101 US 85 FROM EATON (MP 275.5) T 03/02/17 24,597.00 77.00 78.94 66.00 STA0243-087 US 24 El Paso-Elbert CL Pavin 03/23/17 21,268.00 76.00 95.95 90.35 STA0362-035 US 36: Strasburg to Byers 03/23/17 18,331.00 90.00 103.08 87.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 107,321.00 78.88 92.57 78.15 STA006A-057 SH 6 EAST OF STERLING 04/06/17 78,299.00 82.00 86.28 81.00 STA0061-091 SH 6 CHIPSEAL NEAR FLEMING 06/15/17 1,128.00 130.00 138.33 125.00 ER0361-115 US 36 Bridges 06/22/17 5,459.00 95.00 101.28 107.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 84,886.00 83.47 89.74 83.26 NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 4,583.00 75.00 92.50 88.00 BR0362-037 US 36 at MP 140.1 and MP 140. 07/27/17 1,493.00 135.00 136.60 143.35 ERR400-322 PR SH 60 and SH 257 Structure 09/07/17 4,418.00 105.00 81.01 72.00 BRR400-354 Little-T Channel Work and SH -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10,494.00 96.17 96.35 89.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 202,701.00 81.70 92.23 80.86 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 194 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-34771 HMA (Gr SX) (75) (PG 76-28) Ton ==================================================== NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 18,465.00 90.00 87.11 82.48 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 18,465.00 90.00 87.11 82.48 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18,465.00 90.00 87.11 82.48 =============== 403-34801 HMA (Gr SX) (100) Ton ==================================================== NHPP 0701-238 I-70B MP 4.20 TO MP 4.69, US6 04/27/17 16,797.00 55.00 51.25 51.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16,797.00 55.00 51.25 51.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16,797.00 55.00 51.25 51.25 =============== 403-34821 HMA (Gr SX) (100) (PG 58-28) Ton ==================================================== STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 28,182.00 75.00 65.37 64.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 28,182.00 75.00 65.37 64.45 IM025A-037 I25 S. Trinidad Resurface and 11/30/17 35,000.00 75.00 77.75 81.26 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 35,000.00 75.00 77.75 81.26 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 63,182.00 75.00 72.23 73.76 =============== 403-34824 HMA (Gr SX)(100)(PG 58-28)(Special) Ton ==================================================== STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 5,052.00 100.00 71.64 69.93 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,052.00 100.00 71.64 69.93 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,052.00 100.00 71.64 69.93 =============== 403-34841 HMA (Gr SX) (100) (PG 64-22) Ton ==================================================== STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 23,571.09 80.00 75.15 78.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 195 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-34841 HMA (Gr SX) (100) (PG 64-22) Ton ==================================================== NHPPC120-026 US 85: I-76 to 168th 05/04/17 2,439.00 90.00 116.50 110.00 STA0703-437 I-70: 32ND TO 44TH 06/01/17 1,311.00 75.00 149.06 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 27,321.09 80.65 77.49 83.83 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 27,321.09 80.65 77.49 83.83 =============== 403-34851 HMA (Gr SX) (100) (PG 64-28) Ton ==================================================== STM0243-089 Midpoint: Station 1019+50 Cen 01/26/17 6,932.00 90.00 84.28 79.00 STM0243-089 Midpoint: Station 1019+50 Cen -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6,932.00 90.00 84.28 79.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,932.00 90.00 84.28 79.00 =============== 403-34854 HMA (Gr SX)(100)(PG 64-28)(2 In) Sq Yard ================================================ STM0243-089 Midpoint: Station 1019+50 Cen . 65,444.00 10.00 8.90 . STM0243-089 Midpoint: Station 1019+50 Cen -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 65,444.00 10.00 8.90 . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 65,444.00 10.00 8.90 . =============== 403-34871 HMA (Gr SX) (100) (PG 76-28) Ton ==================================================== NHPP R600-440 US40 (COLFAX BLVD) COLORADO B 01/19/17 16,679.00 100.00 113.28 90.00 NHPPR100-249 Region 1 FY 17 US 040A Wall R 02/16/17 59.00 150.00 386.00 398.00 STA2873-180 US 287 (Federal) Resurfacing- 03/09/17 25,680.00 95.00 84.51 74.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 42,418.00 97.04 94.27 81.04 STA095A-018 SH 95 Sheridan Resurfacing: H 04/06/17 20,209.00 92.00 84.50 84.50 STA095A-017 SH 95 Sheridan Resurfacing 25 04/06/17 11,368.00 80.00 111.49 124.00 STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 14,838.00 92.00 99.32 78.20 STA0503-085 US 50 BNSF Railroad to Purcel 04/20/17 11,622.87 90.00 90.20 94.00 STMSH45-001 SH45 FROM MP 4.9-8.7 THRU PUE 04/20/17 3,322.00 110.00 102.72 98.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 61,359.87 90.37 94.23 92.86 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 196 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-34871 HMA (Gr SX) (100) (PG 76-28) Ton ==================================================== NHPP 095A-019 SH95:52ND TO 58TH/RALSTON(MM9 07/20/17 4,678.00 98.00 115.00 115.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,678.00 98.00 115.00 115.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 108,455.87 93.31 94.49 89.19 =============== 403-36721 HMA (Gr ST)(75)(PG 58-28) Ton ==================================================== NH1604-013 US 160C Overlay, Jct. SH 389 01/19/17 32,628.00 85.00 87.65 75.00 NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 4,833.00 95.00 93.43 75.44 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 49,755.00 80.00 89.33 80.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 87,216.00 82.70 89.15 78.22 STA 0503-089 US 50 - Royal Gorge West_SH9 04/06/17 28,710.00 75.00 74.77 70.31 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 28,710.00 75.00 74.77 70.31 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 115,926.00 80.79 85.75 76.26 =============== 403-40000 HMA Safety Edge Lin Foot =============================================== STM0243-089 Midpoint: Station 1019+50 Cen . 31,000.00 1.25 0.92 . STM0243-089 Midpoint: Station 1019+50 Cen -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 31,000.00 1.25 0.92 . NHPP 2873-185 US 287: Ted's Place Intersect 07/13/17 9,408.00 4.00 1.33 0.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 9,408.00 4.00 1.33 0.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40,408.00 1.89 0.99 0.65 =============== 405-00100 Heating and Remixing Treatment Sq Yard ================================================ STR139A-034 SH 139 DOUGLAS PASS MP 19.0 - 12/21/17 177,212.00 5.00 5.22 4.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 177,212.00 5.00 5.22 4.95 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 177,212.00 5.00 5.22 4.95 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 197 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 405-00101 Heating and Remixing Treatment (Special) Sq Yard ================================================ NHPP 0702-381 I-70 VAIL PASS FROST HEAVES 06/15/17 372.00 75.00 134.00 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 372.00 75.00 134.00 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 372.00 75.00 134.00 50.00 =============== 406-09500 Cold Bitum Pvmt (Recycle) Sq Yard ================================================ NHPP4912-006 US 491 Surface Treatment MP 2 03/02/17 167,860.00 2.50 4.03 3.94 NHPP 0502-075 US50 MP 127.0 TO MP 139.1 IN 03/09/17 265,917.00 4.50 4.45 3.85 STA067A-039 SH 67 Divide to Cripple Creek 03/30/17 338,682.00 2.60 5.08 5.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 772,459.00 3.23 4.69 4.46 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 772,459.00 3.23 4.69 4.46 =============== 408-01000 Hot Joint-Crack Sealant Ton ==================================================== STA0404-055 SH 40 Colfax Resurfacing I-70 04/13/17 10.00 3875.00 3919.61 4910.00 STAR100-255 R1 FY18 CRACK SEAL 05/11/17 227.00 4500.00 4312.50 4340.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 237.00 4473.63 4288.15 4364.05 MTCE131A-039 SH 131 MP 0.053-68.721 IN EAG 08/17/17 96.00 4600.00 4440.00 3720.00 MTCE R500-193 R5 FY 18 Regionwide MTCE Crac 09/21/17 42.43 6940.00 7232.00 3398.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 138.43 5317.23 5624.29 3621.30 MTCE0705-084 I-70 CRACK SEAL KANSAS STATE 10/05/17 105.00 3500.00 4229.33 3548.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 105.00 3500.00 4229.33 3548.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 480.43 4503.91 4788.28 3971.69 =============== 408-01100 Joint Sealant Lin Foot =============================================== BR0252-449 I-25 Woodmen NB 03/02/17 1,103.00 15.00 21.25 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,103.00 15.00 21.25 9.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,103.00 15.00 21.25 9.00 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January 22, 2018 198 ITEM UNIT COSTS BY PROJECTS -- 2017 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 409-01015 CC Matl (Ty I) Sq Yard ================================================ NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 37,946.00 1.00 0.97 0.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 37,946.00 1.00 0.97 0.95 MTCE141A-048 SH 141A WHITEWATER IN MESA CO 06/15/17 191,097.00 0.80 0.75 0.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 191,097.00 0.80 0.75 0.75 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 134,235.00 1.00 1.22 1.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 134,235.00 1.00 1.22 1.15 STRR300-228 SH 13 R3 VARIOUS CHIP SEALS 11/30/17 231,481.00 1.15 0.99 0.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 231,481.00 1.15 0.99 0.90 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 594,759.00 0.99 1.04 0.91 =============== 409-02015 CC Matl (Ty II) Sq Yard ================================================ NHPP1602-145 US 160 S. Fork to Monte Vista 01/12/17 386,957.00 1.05 0.95 0.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 386,957.00 1.05 0.95 0.90 MTCE142A-002 SH 142 CHIPSEAL 06/22/17 508,035.00 1.00 0.90 0.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 508,035.00 1.00 0.90 0.90 NHPP2853-003 US 285 MP 143.1- 148.0 07/06/17 134,235.00 1.00 1.29 1.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 134,235.00 1.00 1.29 1.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,029,227.00 1.02 1.02 0.95 COLORADO DEPARTMENT OF TRANSPORTATION 13:12 Monday, January