Colorado Department of Transportation 15:09 Thursday, February 19, 2009 1 2008 Cost Data PROJECTS BID FROM 01/01/08 THROUGH 12/31/08 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20080103 A & S CONSTRUCTION CO. & AFFILIATED CO. 3 $4,147,695.60 100.38 STA133A-034 133/187 RESURFACING 3 M 20080103 ELAM CONSTRUCTION, INC. 2 $3,384,793.00 105.53 NH 0821-085 SH82 EAGLE COUNTY 3 M 20080103 INTERMOUNTAIN SLURRY SEAL, INC. 4 $1,086,860.86 93.15 STA139A-029 N OF DOUGLAS PASS CHIP SEALS 3 M 20080110 SEMA CONSTRUCTION, INC. 4 $22,577,777.77 77.69 STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 2 P 20080110 COULSON EXCAVATING COMPANY 6 $6,895,292.68 93.85 NH0853-066 US 85C SH 60 TO LASALLE 4 R 20080110 CONNELL RESOURCES, INC. ALL BIDS REJECTED - CDOT OPTION HB131A-033 SH 131 ROUTT COUNTY 3 R 20080110 CONNELL RESOURCES, INC. 5 $6,496,397.30 114.80 HB131A-033 SH 131 ROUTT COUNTY 3 R 20080117 PREMIER PAVING, INC. 8 $375,032.73 72.06 STA 0831-099 SH 83 AT RUSSELLVILLE ROAD SOU 1 R 20080117 AMERICAN CIVIL CONSTRUCTORS, INC. 2 $245,745.00 85.77 NH 160A-002 DOUBLE TREE BRIDGE ( O-05-AJ) 5 M 20080117 PREMIER PAVING, INC. 6 $3,248,323.60 91.04 IM 0252-392 I-25, TOMAH ROAD TO DOUGLAS LA 1 U 20080117 UNITED COMPANIES OF MESA COUNTY 5 $5,293,502.15 103.75 IM0701-189 PALISADE EAST 3 R 20080124 COULSON EXCAVATING COMPANY 4 $4,773,079.65 98.06 NH0342-043 ON US 34 IN WELD COUNTY 4 U 20080124 ASPHALT PAVING CO. 6 $2,559,169.65 91.01 STA 093A-007 ON SH 93 IN BOULDER COUNTY 4 U 20080124 AGGREGATE INDUSTRIES - WCR, INC. 3 $13,751,365.26 87.09 C0253-199 I25 RUBBILIZATION N OF SH 56 4 U 20080131 KIEWIT WESTERN CO 4 $1,517,520.62 119.22 SHE 050A-007 SH 50 BETWEEN MORRIS/FORTINO T 2 P 20080131 AGGREGATE INDUSTRIES - WCR, INC. 6 $521,358.25 95.10 CCR600-303 CHATFIELD STATE PARK MAIN RD, 6 R 20080131 DKS ENTERPRISES INC. 3 $602,474.00 83.35 ITS0361-087 US 36 (FEDERAL BLVD TO BOULDER 00 R Colorado Department of Transportation 15:09 Thursday, February 19, 2009 2 2008 Cost Data PROJECTS BID FROM 01/01/08 THROUGH 12/31/08 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20080207 AMERICAN CIVIL CONSTRUCTORS, INC. 6 $1,993,539.00 98.52 HB 0131-050 SH 13 NORTH OF RIFLE 3 M 20080207 W.L. CONTRACTORS, INC. 5 $222,684.50 89.13 STA2873-148 FEDRERAL BLVD (SH 287) AT 70TH 6 U 20080207 LAFARGE WEST, INC 3 $5,100,598.18 96.68 NH0342-048 US 34 IN WELD COUNTY 4 R 20080207 ROCKY MOUNTAIN ENTERPRISES, INC. 3 $293,837.07 86.89 CM240-112 COLORADO SPRINGS - VARIOUS LOC 2 U 20080207 UNITED COMPANIES OF MESA COUNTY 4 $656,970.65 81.24 NH 5502-060 US 550B MILE POST 106.272 TO M 5 R 20080207 UNITED COMPANIES OF MESA COUNTY 4 $4,515,688.50 77.03 C 5502-063 US 550 SILVERTON TO RED MTN PA 5 M 20080207 APC SOUTHERN CONSTRUCTION COMPANY, LLC 4 $5,012,675.57 83.43 NH 2851-004 US 285 RESURFACE FROM NEW MEXI 5 M 20080214 ASPHALT CONSTRUCTORS INC. 5 $3,362,381.60 99.59 STA 017A-010 BEGINNING OF SH 17 FROM MP 69. 5 R 20080214 BRANNAN SAND AND GRAVEL, LLC 5 $3,635,675.58 84.31 IM 0252-386 I-25: RESURFACE 23RD TO 48TH 6 U 20080214 BRANNAN SAND AND GRAVEL, LLC 7 $625,811.84 75.84 STA 391A-003 KIPLING: 6TH AVE TO COLFAX 6 U 20080214 SCOTT CONTRACTING INC. 5 $184,655.00 100.13 SHE0741-016 THE INTERSECTION OF SH 74 AND 1 M 20080214 APC SOUTHERN CONSTRUCTION COMPANY, LLC 4 $5,376,287.95 105.97 NH 1602-116 SOUTH FORK EAST 5 M 20080214 SCHMIDT CONSTRUCTION COMPANY 3 $6,133,402.89 88.62 STA0252-397 I25 NORTHGATE NORTH 2 U 20080214 A & S CONSTRUCTION CO. & AFFILIATED CO. 4 $4,567,070.50 111.65 HB135A-024 SH 135 CRESTED BUTTE SOUTH 3 M 20080215 JALISCO INTERNATIONAL, INC. 1 $820,290.00 100.44 C 0253-202 I-25 6 U 20080228 PREMIER PAVING, INC. 8 $1,479,928.52 92.33 NH0405-032 COLFAX AVENUE FROM COLORADO B 6 U 20080228 PREMIER PAVING, INC. 8 $816,806.10 90.23 NH 0404-046 COLFAX AVE: ARAPAHOE/ADAMS COU 6 U Colorado Department of Transportation 15:09 Thursday, February 19, 2009 3 2008 Cost Data PROJECTS BID FROM 01/01/08 THROUGH 12/31/08 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20080228 PREMIER PAVING, INC. 4 $3,399,903.26 93.91 IM0252-393 DENVER - I-25 FROM SANTA FE DR 6 U 20080228 BRANNAN SAND AND GRAVEL, LLC 7 $2,419,993.55 94.76 STA 002A-001 COLO. BLVD(SH 2A): MEXICO TO A 6 U 20080228 A-1 CHIPSEAL COMPANY 2 $834,834.00 100.79 STA060A-012 SH 60 US 85 WEST & SH 257 MILL 4 R 20080228 BRANNAN SAND AND GRAVEL, LLC 8 $1,881,174.62 77.10 STA 079A-011 SH40 / SH79, SH40 (309.26-311 1 R 20080306 APC SOUTHERN CONSTRUCTION COMPANY, LLC ALL BIDS REJECTED - CDOT OPTION STU 0251-329 S OF COLORADO CITY TO CEDARWOO 2 R 20080306 APC SOUTHERN CONSTRUCTION COMPANY, LLC 5 $16,752,092.55 110.84 STU 0251-329 S OF COLORADO CITY TO CEDARWOO 2 R 20080306 TETRA TECH CONSTRUCTION SERVICES, INC 3 $5,042,261.52 100.71 C 0702-274 FRISCO (MM 201) TO EAST VAIL ( 1 M 20080313 ASPHALT PAVING CO. 7 $972,690.70 82.94 STA 072A-030 SH 72, 64TH AVE TO 84TH PKWY 6 U 20080313 A & S CONSTRUCTION CO. & AFFILIATED CO. 3 $9,741,062.12 118.61 SHE0702-276 EAGLE COUNTY I-70 MP 171 TO MP 3 M 20080313 SIMON CONTRACTORS 6 $4,470,973.70 86.62 HB0132-017 SH13 WY STATE LINE SOUTH OVERL 3 M 20080320 BRANNAN SAND AND GRAVEL, LLC 6 $623,715.96 94.44 STA052A-029 ON SH 52 IN WELD COUNTY 4 R 20080320 ASPHALT SPECIALTIES CO., INC. 8 $4,526,967.75 93.50 IM0703-327 I-70 SILVERTHORNE TO EJMT 1 M 20080320 ARROW ELECTRIC SERVICE, INC. 8 $161,558.45 82.68 SRP083A-032 HIGHWAY 83 AND HODGEN IN EL PA 2 P 20080327 A & S CONSTRUCTION CO. & AFFILIATED CO. 3 $2,267,006.50 105.04 NH 1603-025 US 160 ALAMOSA MILL AND FILL 5 R 20080327 UNITED COMPANIES OF MESA COUNTY 2 $2,976,827.40 98.52 STA1251-006 WINDY GAP RES-GRAND COUNTY 3 M 20080327 AMERICAN WEST CONSTRUCTION, LLC 1 $239,531.50 96.25 BR 0403-051 US 40 MP 245.85 1 M 20080403 CASTLE ROCK CONST. CO. OF COLO, LLC 3 $17,300,345.31 98.19 NH 2871-031 US 287 SOUTH OF LAMAR FROM MP 2 R Colorado Department of Transportation 15:09 Thursday, February 19, 2009 4 2008 Cost Data PROJECTS BID FROM 01/01/08 THROUGH 12/31/08 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20080403 SCOTT CONTRACTING INC. 7 $2,287,435.80 100.84 C 1191-023 FROM MP 0.0 TO MP 2.6 GILPIN C 1 M 20080403 SEMA CONSTRUCTION, INC. 4 $26,692,000.00 104.53 NH 1602-114 US 160 4TH LANE THROUGH FARMIN 5 M 20080403 FLATIRON CONSTRUCTORS, INC. 2 $7,401,433.81 72.98 IM 0703-322 I-70 MM 213-215 1 M 20080410 EDWARD KRAEMER & SONS INC. 9 $29,407,999.45 115.98 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 1 R 20080410 Skanska USA 6 $8,236,859.30 93.75 NH5501-013 US 550 N OF NM STATE LINE, MP 5 R 20080410 INTERMOUNTAIN SLURRY SEAL, INC. 3 $1,424,425.00 98.18 STA3852-011 SH 385 IN PHILLIPS COUNTY 4 P 20080410 KIEWIT WESTERN CO 5 $1,047,059.00 107.41 C 067A-026 SH67 AND CR81 2 M 20080410 K.E.C.I. COLORADO, INC. 3 $750,374.30 105.87 SHE 0501-056 US 50 AND 28.5 RD IN GRAND JUN 3 U 20080417 LAFARGE WEST, INC 3 $3,969,728.35 117.48 STA 0343-026 ON US 34 IN YUMA COUNTY 4 P 20080417 A & S CONSTRUCTION CO. & AFFILIATED CO. 3 $2,237,574.90 133.70 NH 0503-064 US 50:15TH AND 16TH ST IN CANO 2 U 20080417 LAFARGE WEST, INC 6 $1,689,662.64 100.59 NH 030A-026 SH30 1ST AVE AT HAVANA ST TO P 6 R 20080417 QUALITY PAVING COMPANY 4 $1,532,512.79 92.66 IM 0704-207 I-70 FROM I-225 TO TOWER RD 6 U 20080417 LAWRENCE CONSTRUCTION CO. 5 $16,754,116.07 111.66 IM 0705-077 I70 WEST OF BURLINGTON EAST IN 1 P 20080424 CACTUS TRANSPORT, INC. 3 $1,097,998.85 102.59 NH 5502-059 US 550 DURANGO MP 24.183 NORTH 5 M 20080424 TRICON 2, LLC 4 $299,000.00 120.82 HB0403-052 US40 BERTHOUD PASS 3 M 20080430 HAYWARD BAKER, INC. 4 $2,983,703.00 44.21 IM 0702-281 I-70 IN DOWD CANYON 3 M 20080501 SCOTT CONTRACTING INC. 4 $1,895,895.95 105.95 STA 009A-001 SH 9 HOOSIER PASS NORTH - PHAS 1 M Colorado Department of Transportation 15:09 Thursday, February 19, 2009 5 2008 Cost Data PROJECTS BID FROM 01/01/08 THROUGH 12/31/08 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20080501 W.L. CONTRACTORS, INC. 7 $236,195.00 109.82 SHE 2854-114 SH 285-BRADEY CT. 6 U 20080501 ASPHALT SPECIALTIES CO., INC. LOW BID IS GREATER THAN 15% OVER ENG EST C0703-337 I-70 EMPIRE JCT. EAST OVERLAY 1 M 20080501 ASPHALT PAVING CO. 3 $2,965,399.12 93.04 STA009A-025 SH9 FROM FAIRPLAY TO HARTSEL 1 M 20080508 POWER ENGINEERS, INC. 3 $871,503.58 154.78 EPSW00-541 DENVER AREA; SH 6, I-25, I-70 6 R 20080515 HIGHWAY TECHNOLOGIES 6 $908,005.02 83.49 SHE 0761-195 I-76: BURLINGTON CANAL TO BROM 6 R 20080515 IDEAL FENCING CORPORATION 5 $1,256,471.75 110.95 STA0703-334 I-70 FROM BAKERVILLE TO EAST 1 M 20080515 TRICON 2, LLC 7 $3,985,000.00 87.36 NH0504-056 US 50 PASSING LANES EAST OF 59 2 R 20080515 SCOTT CONTRACTING INC. 5 $344,563.80 96.10 STS 1151-021 SH 115 AT CR F45 IN FREMONT CO 2 R 20080522 ELAM CONSTRUCTION, INC. 3 $722,341.00 102.49 NH0063-024 US 6 EAGLE 3 M 20080522 KB CONSTRUCTION, INC 4 $380,168.94 89.13 C 090A-002 ON S.H. 90 FROM M.P. 10.6 TO M 5 M 20080605 LAWSON CONSTRUCTION COMPANY 3 $14,578,201.75 103.41 NH 1602-112 US 160 THROUGH BODO PARK 5 M 20080605 ASPHALT SPECIALTIES CO., INC. 3 $5,134,640.60 98.90 C0703-337 I-70 EMPIRE JCT. EAST OVERLAY 1 M 20080612 DKS ENTERPRISES INC. 2 $1,398,971.50 108.65 C0703-330 I-70 TWIN TUNNELS WESTBOUND 1 M 20080612 STURGEON ELECTRIC COMPANY, INC 2 $2,779,795.00 79.36 IM 070A-003 I 70 BETWEEN DENVER AND VAIL 1 M 20080619 KIEWIT WESTERN CO < 3 BIDDERS & LOW BID > 10% OVER ENG EST STA 0404-044 WEST COLFAX AVE. (US 40) FROM 6 R 20080619 SCOTT CONTRACTING INC. 6 $468,980.95 75.12 C119A-054 SH 119 FROM MP 6.5 TO MP 8.0 1 M 20080619 DURAN EXCAVATING, INC. 6 $314,002.50 110.33 SHE3921-008 SH 392 @ WCR 31(HES) 4 R Colorado Department of Transportation 15:09 Thursday, February 19, 2009 6 2008 Cost Data PROJECTS BID FROM 01/01/08 THROUGH 12/31/08 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20080626 CASTLE ROCK CONST. CO. OF COLO, LLC 9 $12,764,337.24 86.15 STA0342-037 U.S. 34 BUSINESS ROUTE FROM SH 4 R 20080626 INTERFACE COMMUNICATIONS, COMPANY 4 $173,142.00 103.84 SHE0091-033 SH9 SIGNAL INTERCONNECT 1 M 20080626 AMERICAN WEST CONSTRUCTION, LLC 5 $430,877.65 91.93 C 1601-060 US 160 MONTEZUMA COUNTY 5 R 20080626 AMERICAN WEST CONSTRUCTION, LLC 4 $847,878.00 104.82 C0702-275 I-70 VAIL PASS 3 M 20080626 INSITUFORM TECHNOLOGIES, INC. 3 $493,857.00 54.29 C0503-068 SH 50 PUEBLO CLUB MANOR - PIPE 2 U 20080626 DKS ENTERPRISES INC. 4 $293,322.15 101.34 STA086A-048 INTERSECTION OF SH 86 & COUNTY 1 R 20080626 KIEWIT WESTERN CO 3 $568,645.00 120.53 STA069A-024 SH 69 HUERFANO COUNTY 2 M 20080626 KIEWIT WESTERN CO 5 $953,926.22 89.22 STA 069A-023 SH 69 WESTCLIFFE AREA - CUSTER 2 M 20080627 J.L. WAGNER CONSTRUCTION, INC. 1 $844,309.75 100.00 C0402-073 US 40, WEST OF STEAMBOAT SPRI 3 R 20080710 AMERICAN CIVIL CONSTRUCTORS, INC. 3 $21,624,300.00 93.49 CR 600-275 I-70 VIADUCT - COLO. TO BRIGHT 6 U 20080710 NEW DESIGN CONSTRUCTION CO. 8 $2,011,980.45 92.24 STA0831-106 PARKER RD. (SH 83) MP 65.5 TO 6 R 20080710 COLORADO BORING. CO. 7 $328,730.00 82.93 STPR600-311 SH 72 FROM I-70 TO 86TH AVE 6 U 20080717 BRANNAN SAND AND GRAVEL, LLC 8 $939,122.93 77.11 STA 0404-044 WEST COLFAX AVE. (US 40) FROM 6 R 20080717 INTERFACE COMMUNICATIONS, COMPANY 5 $452,029.64 111.73 SHE 070A-005 I-70 B FROM PATTERSON (F RD.) 3 U 20080724 ZAK DIRT, INC. 10 $1,479,416.28 84.81 STA R400-147 ON SH 52 IN MORGAN COUNTY 4 P 20080724 SCOTT CONTRACTING INC. 5 $335,314.35 89.65 SHE0831-102 PARKER RD: LONG AVE INTERSECTI 1 R 20080724 INTERSTATE SEALANT & CONCRETE, INC. 3 $436,086.00 161.35 IM 0702-282 I-70 MP 118 TO 131 3 M Colorado Department of Transportation 15:09 Thursday, February 19, 2009 7 2008 Cost Data PROJECTS BID FROM 01/01/08 THROUGH 12/31/08 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20080731 SCOTT CONTRACTING INC. 6 $5,395,771.45 106.57 NH 2854-109 US 285: DEER CREEK INTERCHANGE 1 M 20080807 ELAM CONSTRUCTION, INC. < 3 BIDDERS & LOW BID > 10% OVER ENG EST NH 0501-057 ON US HWY 50 FROM MP. 38.0 TO 3 R 20080814 INTEGRATED ELECTRIC, INC. 5 $566,800.86 82.58 SHE R600-310 US285/FED, I-25/120TH, I-270/Q 6 U 20080821 TRICON 2, LLC 6 $197,500.00 98.80 NHC040-027 POWERS BLVD - FROM WOODMEN ROA 2 R 20080821 JALISCO INTERNATIONAL, INC. 7 $3,968,834.70 109.74 STU M193-001 ARAPAHOE ROAD AND (SH177) UNIV 6 U 20080828 AIS CONSTRUCTION COMPANY 3 $494,054.88 103.45 NH0503-065 3 MILES WEST OF COTOPAXI 2 M 20080904 AMERICAN WEST CONSTRUCTION, LLC 4 $331,891.50 76.77 BRS R200-154 I-25 MP 59.09, MP 65.6, MP 79. 2 R 20080911 TLM CONSTRUCTORS, INC. 6 $338,332.00 96.96 BR R400-206 VARIOUS LOCATIONS IN REGION 4. 4 P 20080911 UNITED COMPANIES OF MESA COUNTY 2 $1,014,918.90 108.94 NH 0501-057 ON US HWY 50 FROM MP. 38.0 TO 3 R 20080911 TRICON 2, LLC 5 $1,648,000.00 90.53 C0702-284 I-70 TRUCK PARKING AT DOTSERO 3 M 20081009 A & S CONSTRUCTION CO. & AFFILIATED CO. 5 $3,687,694.70 104.14 NH1601-058 ON US 160, FROM M.P. 21.40 TO 5 R 20081009 LAWRENCE CONSTRUCTION CO. 11 $10,913,172.50 81.51 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 1 R 20081009 A & S CONSTRUCTION CO. & AFFILIATED CO. 2 $2,987,574.90 109.85 PLH 150A-007 INTERSECTION OF US 160 & SH 15 5 P 20081009 TEZAK HEAVY EQUIPMENT CO., INC. 9 $2,049,430.27 92.77 BRS120A-008 ON SH 120 AT MP 2.76 IN FREMON 2 R 20081009 IDEAL FENCING CORPORATION 4 $279,132.60 103.90 IMR600-322 I-25: COUNTY LINE RD TO BELLEV 6 R 20081016 TRICON 2, LLC 4 $1,083,000.00 106.68 SHE 0821-082 SH 82/SMITH WAY - PITKIN 3 M 20081016 HAMON CONTRACTORS, INC. 7 $2,712,914.95 86.93 BR 0361-088 US36 AND CHERRYVALE RD 4 R Colorado Department of Transportation 15:09 Thursday, February 19, 2009 8 2008 Cost Data PROJECTS BID FROM 01/01/08 THROUGH 12/31/08 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20081120 UNITED COMPANIES OF MESA COUNTY 2 $789,909.40 92.85 C092A-021 SH 92 MM 0.0 TO 4.2 & US 50 MM 3 U 20081204 SEMA CONSTRUCTION, INC. 6 $6,562,928.80 107.65 C1601-057 ON U.S. 160, APPROXIMATELY M.P 5 R 20081204 ARROW ELECTRIC SERVICE, INC. 5 $389,415.88 82.89 SHE 0451-009 SH45 (PUEBLO BLVD) AND RED CRE 2 U 20081204 SEMA CONSTRUCTION, INC. 4 $4,108,320.58 94.46 NH 1602-117 THIS PROJECT IS LOCATED ABOUT 5 M 20081204 TETRA TECH CONSTRUCTION SERVICES, INC 9 $146,225.00 81.27 STA0853-069 US 85 & COLLINS ST (EATON) 4 P 20081211 YENTER COMPANIES, INC. 5 $743,016.64 64.89 IM0703-324 GEORGETOWN HILL CHUTE 4 PHASE 1 M 20081211 SORTER CONSTRUCTION, INC. 10 $391,930.50 78.28 C0063-027 US 6 LOMA STR H-01-E, MP 13.14 3 R Colorado Department of Transportation 15:09 Thursday, February 19, 2009 1 2008 Cost Data BRIDGE COST PER SQUARE FOOT (01/01/08 THROUGH 12/31/08) ------------------------------------------------------------------------------------------------------------------------------------ PROJECT NUMBER/ TERR/ TOTAL TOTAL COST PER DATE LET PROJECT LOCATION BRIDGE ID LENGTH WIDTH SQUARE FT COST SQUARE FOOT ------------------------------------------------------------------------------------------------------------------------------------ BRIDGE REPAIR 080117 IM 0252-392 U I-25, TOMAH ROAD TO DOUGLAS LA H-17-CQ 203.4190 122.5000 24918.8 $99,882 $4.01 080124 STA 093A-007 U ON SH 93 IN BOULDER COUNTY E-16-AN 73.0180 86.5220 6331.7 $30,173 $4.77 080214 STA0252-397 U I25 NORTHGATE NORTH H-17-BC & H-17-BD 380.0000 57.9990 22039.6 $125,412 $5.69 080228 IM0252-393 U DENVER - I-25 FROM SANTA FE DR F-16-DW 241.9000 58.9200 14252.7 $229,065 $16.07 F-16-DT 336.9100 58.9200 19850.7 $240,081 $12.09 F-16-EG 147.0370 206.0530 30297.4 $4,403 $0.15 080320 IM0703-327 M I-70 SILVERTHORNE TO EJMT F-12-X 554.0850 50.4990 27980.7 $71,323 $2.55 F-12-R 312.0800 44.5110 13891.0 $73,882 $5.32 F-12-P 70.0160 42.0110 2941.4 $6,273 $2.13 080710 CR 600-275 U I-70 VIADUCT - COLO. TO BRIGHT E-17-FX 6267.0000 90.8790 569538.7 $17,363,657 $30.49 E-17-Z 99.0260 100.1250 9915.0 $216,310 $21.82 WEIGHTED AVERAGE COST: NEW STRUCTURES 741957.9 $18,460,462 $24.88 CONCRETE SLAB AND GIRDER 080110 STUR200-110 P SH 16 ALIGNMENT FROM SH 85 TO J-18-BA 104.1700 51.5000 5364.8 $182,621 $34.04 J-18-BM 220.5830 124.0000 27352.3 $2,350,643 $85.94 J-18-BN 370.7710 134.0000 49683.3 $3,646,382 $73.39 J-18-BO 277.6250 41.0000 11382.6 $992,878 $87.23 080410 IM 0252-383 R DOUGLAS LANE TO 5TH STREET IN G-17-DX & G-17-DY 212.6670 135.0840 28727.9 $2,557,107 $89.01 OFFSYS 205.2500 94.0000 19293.5 $1,860,114 $96.41 081016 BR 0361-088 R US36 AND CHERRYVALE RD E-16-QT 288.2708 43.0000 12395.6 $1,388,638 $112.03 081204 C1601-057 R ON U.S. 160, APPROXIMATELY M.P P-1-A 85.5000 34.0000 2907.0 $29,151 $10.03 WEIGHTED AVERAGE COST: NEW STRUCTURES 157107.0 $13,007,533 $82.79 Colorado Department of Transportation 15:09 Thursday, February 19, 2009 2 2008 Cost Data BRIDGE COST PER SQUARE FOOT (01/01/08 THROUGH 12/31/08) ------------------------------------------------------------------------------------------------------------------------------------ PROJECT NUMBER/ TERR/ TOTAL TOTAL COST PER DATE LET PROJECT LOCATION BRIDGE ID LENGTH WIDTH SQUARE FT COST SQUARE FOOT ------------------------------------------------------------------------------------------------------------------------------------ PRESTRES GIRDER (BOX SECTION) 081009 C0252-390 R I-25 FRONTAGE ROAD & 8-LANING OFFSYS 120.0520 43.0000 5162.2 $912,249 $176.72 081009 BRS120A-008 R ON SH 120 AT MP 2.76 IN FREMON K-16-AM 238.5000 43.0000 10255.5 $1,178,711 $114.93 WEIGHTED AVERAGE COST: NEW STRUCTURES 15417.7 $2,090,960 $135.62 PRESTRES GIRDER (TT SECTION) 080410 NH5501-013 R US 550 N OF NM STATE LINE, MP P-05-AH 57.1880 51.0000 2916.6 $455,173 $156.06 P-05-AI 150.5420 55.0000 8279.8 $1,162,923 $140.45 WEIGHTED AVERAGE COST: NEW STRUCTURES 11196.4 $1,618,096 $144.52 MAJOR STRUCTURE CBC OR PIPES 080724 STA R400-147 P ON SH 52 IN MORGAN COUNTY C-21-BR 125.8330 43.0000 5410.8 $516,840 $95.52 081009 C0252-390 R I-25 FRONTAGE ROAD & 8-LANING Minor Culvert 12.0000 40.0000 480.0 $206,607 $430.43 WEIGHTED AVERAGE COST: NEW STRUCTURES 5890.8 $723,447 $122.81 ROLLED STEEL GIRDER 080410 IM 0252-383 R DOUGLAS LANE TO 5TH STREET IN G-17-DZ & G-17-EA 270.0000 59.5420 16076.3 $1,973,015 $122.73 WEIGHTED AVERAGE COST: NEW STRUCTURES 16076.3 $1,973,015 $122.73 Colorado Department of Transportation 15:09 Thursday, February 19, 2009 1 2008 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/08 THROUGH 12/31/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 201-00000 Clearing and Grubbing 23 Lump Sum 1,001,101.74 43,526.16 201-00001 Clearing and Grubbing 121 Acre 348,596.65 2,880.96 201-00005 Removal of Debris 1 Lump Sum 1,500.00 1,500.00 202-00000 Removal of Structures and Obstructions 6 Lump Sum 16,143.25 2,690.54 202-00001 Removal of Structure 70 Each 80,150.40 1,145.01 202-00002 Removal of Structure (Special) 6 Each 22,100.00 3,683.33 202-00008 Tree Trimming 10 Hour 1,748.00 174.80 202-00010 Removal of Tree 845 Each 148,611.49 175.87 202-00011 Tree Trimming 3 Each 3,007.71 1,002.57 202-00012 Removal of Tree Stump 250 Each 64,281.25 257.13 202-00015 Removal of Headwall 31 Each 20,068.00 647.35 202-00019 Removal of Inlet 72 Each 66,692.74 926.29 202-00021 Removal of Manhole 10 Each 9,957.38 995.74 202-00023 Removal of Embankment Protector Type 3 5 Each 9,540.00 1,908.00 202-00024 Removal of Embankment Protector Type 5 4 Each 2,230.00 557.50 202-00025 Removal of Ditch Lining 20 Lin Foot 1,000.00 50.00 202-00026 Removal of Slope and Ditch Paving 1,587 Sq Yard 14,915.94 9.40 202-00027 Removal of Riprap 125 Sq Yard 4,554.80 36.44 202-00033 Removal of Pipe 127 Each 130,558.92 1,028.02 202-00035 Removal of Pipe 13,057 Lin Foot 256,999.91 19.68 202-00037 Removal of End Section 59 Each 14,545.28 246.53 202-00090 Removal of Delineator 7,309 Each 53,204.98 7.28 202-00155 Removal of Wall 321 Lin Foot 29,856.50 93.01 202-00190 Removal of Concrete Median Cover Material 11,323 Sq Yard 104,266.10 9.21 202-00195 Removal of Median Cover 6,393 Sq Yard 40,968.78 6.41 202-00200 Removal of Sidewalk 7,145 Sq Yard 105,350.41 14.74 202-00201 Removal of Curb 42,521 Lin Foot 147,852.57 3.48 202-00202 Removal of Gutter 419 Lin Foot 7,110.51 16.97 202-00203 Removal of Curb and Gutter 61,733 Lin Foot 387,654.55 6.28 202-00206 Removal of Concrete Curb Ramp 1,562 Sq Yard 42,095.01 26.95 202-00210 Removal of Concrete Pavement 66,600 Sq Yard 457,490.15 6.87 202-00215 Removal of Concrete Pavement (Planing) 19,222 Sq Yard 175,881.30 9.15 202-00220 Removal of Asphalt Mat 469,292 Sq Yard 1,625,839.52 3.46 202-00226 Removal of Asphalt Mat (Special) 259,955 Sq Yard 264,730.37 1.02 202-00240 Removal of Asphalt Mat (Planing) 2,626,524 Sq Yard 5,591,098.76 2.13 202-00246 Removal of Asphalt Mat (Planing) (Special) 5,574 Sq Yard 125,554.02 22.52 202-00250 Removal of Pavement Marking 357,319 Sq Foot 439,375.78 1.23 202-00300 Removal Of Building(s) 2 Lump Sum 209,900.00 104,950.00 Colorado Department of Transportation 15:09 Thursday, February 19, 2009 2 2008 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/08 THROUGH 12/31/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 202-00400 Removal of Bridge 13 Each 981,617.24 75,509.02 202-00420 Rem of Ped Rail 50 Lin Foot 787.00 15.74 202-00425 Removal of Bridge Railing 4,270 Lin Foot 46,846.18 10.97 202-00450 Removal of Portions of Present Structure (Class 1) 124 Sq Yard 27,006.55 217.79 202-00453 Removal of Portions of Present Structure (Class 2) 1,061 Sq Yard 208,770.00 196.77 202-00454 Removal of Portions of Present Structure (Class 2A) 53 Sq Yard 9,122.00 172.11 202-00456 Removal of Portions of Present Structure (Class 2B) 53 Sq Yard 9,512.00 179.47 202-00460 Removal of Portions of Present Structure (Class 3) 99 Sq Yard 41,930.35 423.54 202-00462 Removal of Portions of Present Structure (Class 3A) 11 Sq Yard 4,015.00 365.00 202-00480 Removal Of Portions Of Present Structure (Special) 3,793 Sq Yard 284,475.00 75.00 202-00495 Removal of Portions of Present Structure 7 Lump Sum 178,465.00 25,495.00 202-00500 Removal of Portions of Present Structure 8 Each 24,962.51 3,120.31 202-00502 Removal of Portions of Present Structure 169 Cubic Yard 7,780.00 46.04 202-00503 Removal of Portions of Present Structure 1,386 Sq Yard 2,370,375.46 1,710.23 202-00504 Removal of Expansion Device 2,512 Lin Foot 391,818.96 155.98 202-00700 Removal of Light Standard 27 Each 10,380.00 384.44 202-00725 Removal of Existing Lighting System 1 Lump Sum 36,600.00 36,600.00 202-00750 Removal of Luminaire 223 Each 44,640.00 200.18 202-00805 Removal of Overhead Sign Structure 2 Each 4,201.00 2,100.50 202-00810 Removal of Ground Sign 998 Each 74,824.13 74.97 202-00815 Removal of Sign (Special) 4 Each 992.34 248.09 202-00821 Removal of Sign Panel 257 Each 12,409.61 48.29 202-00825 Removal of Flashing Beacon 2 Each 270.00 135.00 202-00827 Removal of Pull Box 9 Each 506.52 56.28 202-00828 Removal of Traffic Signal Equipment 9 Lump Sum 43,264.90 4,807.21 202-00840 Removal of Traffic Signal Pole 37 Each 43,067.00 1,163.97 202-00842 Removal of Mast Arm 1 Each 685.00 685.00 202-00848 Removal of Traffic Signal Controller and Cabinet 4 Each 2,213.00 553.25 202-00855 Removal of Traffic Signal Controller Cabinet 1 Each 1,537.50 1,537.50 202-00858 Removal of Pedestal Pole 4 Each 1,475.00 368.75 202-00895 Removal of Impact Attenuator 7 Each 13,675.20 1,953.60 202-01000 Removal of Fence 257,478 Lin Foot 191,708.92 0.74 202-01010 Removal Of Silt Fence 750 Lin Foot 622.50 0.83 202-01030 Removal of Road Closure Gate 9 Each 2,959.02 328.78 202-01110 Removal of Guardrail Type 1 625 Lin Foot 2,187.50 3.50 202-01130 Removal of Guardrail Type 3 134,109 Lin Foot 331,835.47 2.47 202-01135 Removal of Guardrail Thrie Beam 599 Lin Foot 2,066.55 3.45 202-01140 Removal of Guardrail Type 4 47,071 Lin Foot 1,188,481.24 25.25 Colorado Department of Transportation 15:09 Thursday, February 19, 2009 3 2008 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/08 THROUGH 12/31/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 202-01170 Removal of Guardrail Type 7 165 Lin Foot 7,798.20 47.26 202-01200 Removal of Tensioned Cable Barrier 11,535 Lin Foot 17,999.50 1.56 202-01300 Removal of End Anchorage 318 Each 34,497.31 108.48 202-04001 Plug Culvert 56 Each 193,978.12 3,463.90 202-04002 Clean Culvert 127 Each 276,731.58 2,178.99 202-04003 Clean Culvert (Special) 81 Each 23,107.80 285.28 202-04004 Plug Culvert (Special) 1 Each 2,400.00 2,400.00 202-04005 Clean Valve Box 177 Each 15,718.48 88.80 202-04100 Abandon Well 2 Each 6,600.00 3,300.00 202-04300 Removal of Underground Storage Tank 2 Each 15,600.00 7,800.00 202-05008 Sawing Concrete (8 Inch) 7,839 Lin Foot 21,557.25 2.75 202-05010 Sawing Concrete (10 Inch) 135 Lin Foot 4,725.00 35.00 202-05019 Sawing Concrete (Special) 1,000 Lin Foot 15,000.00 15.00 202-05026 Sawing Asphalt Material (6 Inch) 49,856 Lin Foot 51,956.50 1.04 202-05030 Sawing Asphalt Material (10 Inch) 8,296 Lin Foot 24,888.00 3.00 202-05100 Sandblasting Reinforcing Steel 928 Sq Yard 13,288.00 14.32 202-05150 Sandblasting 164,837 Sq Foot 58,060.52 0.35 202-05300 Removal and Disposal of Paint 1 Lump Sum 680.00 680.00 202-06000 Removal of Detour 1 Lump Sum 11,000.00 11,000.00 202-06520 Removal of Existing Wall Panels 1 Lump Sum 640,000.00 640,000.00 202-06530 Clean Drain Pipe (Special) 41 Each 3,642.00 88.83 203-00000 Unclassified Excavation 34,984 Cubic Yard 845,384.96 24.16 203-00010 Unclassified Excavation (Complete In Place) 963,757 Cubic Yard 7,691,463.35 7.98 203-00040 Unclassified Excavation (Special) 13,463 Cubic Yard 391,387.50 29.07 203-00060 Embankment Material (Complete In Place) 980,756 Cubic Yard 8,109,590.63 8.27 203-00061 Embankment Material (Complete In Place) 2,147 Ton 30,058.00 14.00 203-00062 Embankment Material (Complete In Place) (Special) 141,246 Cubic Yard 1,442,350.06 10.21 203-00100 Muck Excavation 24,545 Cubic Yard 352,664.00 14.37 203-00210 Borrow (Complete In Place) 1,134 Cubic Yard 23,814.00 21.00 203-00400 Rock Excavation 33,990 Cubic Yard 651,548.50 19.17 203-00510 Rock Fill (Special) 651 Cubic Yard 2,890.44 4.44 203-00592 Rock Staining 16,954 Sq Foot 45,029.80 2.66 203-00595 Rock Scaling 302 Sq Yard 8,456.00 28.00 203-00598 Rock Scaling 30 Hour 7,200.00 240.00 203-00850 Expanded Polystyrene Fill (Complete In Place) 5,500 Cubic Yard 440,000.00 80.00 203-01100 Proof Rolling 1,074 Hour 105,292.25 98.04 203-01140 Rolling 388 Hour 38,317.80 98.76 203-01500 Blading 4,585 Hour 577,617.85 125.98 Colorado Department of Transportation 15:09 Thursday, February 19, 2009 4 2008 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/08 THROUGH 12/31/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 203-01510 Backhoe 1,228 Hour 181,046.25 147.43 203-01515 Backhoe (Landscaping) 4 Hour 560.00 140.00 203-01550 Dozing 1,127 Hour 157,134.00 139.43 203-01555 Dozing (Landscaping) 138 Hour 28,790.00 208.62 203-01565 Hydraulic Excavator 24 Hour 3,480.00 145.00 203-01582 Truck (Dump) 164 Hour 14,480.00 88.29 203-01590 Front End Loader (Rubber Tire) 603 Hour 72,679.95 120.53 203-01594 Combination Loader 1,643 Hour 181,955.20 110.75 203-01597 Potholing 2,158 Hour 450,884.10 208.94 203-01610 Crane (Rubber Tire) 50 Hour 23,000.00 460.00 203-01620 Sweeping 118 Hour 17,630.00 149.41 203-01622 Sweeping (With Pickup Broom) 820 Hour 112,040.40 136.63 203-02300 Rock Scaler 362 Hour 81,101.34 224.04 203-02330 Laborer 781 Hour 31,615.50 40.48 206-00000 Structure Excavation 88,037 Cubic Yard 701,043.40 7.96 206-00060 Structure Backfill (Special) (Flow-Fill) 122 Cubic Yard 19,520.00 160.00 206-00065 Structure Backfill (Flow-Fill) 11,846 Cubic Yard 979,020.44 82.65 206-00100 Structure Backfill (Class 1) 64,212 Cubic Yard 1,810,730.85 28.20 206-00200 Structure Backfill (Class 2) 3,271 Cubic Yard 60,111.63 18.38 206-00360 Mechanical Reinforcement of Soil 27,191 Cubic Yard 685,200.05 25.20 206-00505 Filter Material (Special) 604 Cubic Yard 25,992.00 43.03 206-00510 Filter Material (Class A) 185 Cubic Yard 12,930.00 69.89 206-00520 Filter Material (Class B) 2,477 Cubic Yard 135,720.00 54.79 206-01000 Bed Course Material 92 Cubic Yard 4,600.00 50.00 206-01750 Shoring 3 Lump Sum 55,750.92 18,583.64 206-01781 Shoring (Area 1) 7 Lump Sum 258,024.00 36,860.57 206-01782 Shoring (Area 2) 4 Lump Sum 150,000.00 37,500.00 206-01783 Shoring (Area 3) 1 Lump Sum 7,500.00 7,500.00 206-01784 Shoring (Area 4) 1 Lump Sum 40,000.00 40,000.00 206-01785 Shoring (Area 5) 1 Lump Sum 40,000.00 40,000.00 206-01786 Shoring (Area 6) 1 Lump Sum 7,500.00 7,500.00 206-01787 Shoring (Area 7) 1 Lump Sum 7,500.00 7,500.00 206-01788 Shoring (Area 8) 1 Lump Sum 500.00 500.00 206-01789 Shoring (Area 9) 1 Lump Sum 500.00 500.00 207-00205 Topsoil 180,817 Cubic Yard 952,509.97 5.27 207-00210 Stockpile Topsoil 86,759 Cubic Yard 237,546.35 2.74 207-00305 Wetland Topsoil 1,840 Cubic Yard 32,012.80 17.40 207-00310 Stockpile Wetland Topsoil 808 Cubic Yard 7,788.00 9.64 Colorado Department of Transportation 15:09 Thursday, February 19, 2009 5 2008 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/08 THROUGH 12/31/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 208-00002 Erosion Log (12 Inch) 178,545 Lin Foot 813,680.97 4.56 208-00003 Erosion Log (18 Inch) 8,370 Lin Foot 53,218.00 6.36 208-00004 Silt Berm 3,274 Lin Foot 31,210.32 9.53 208-00005 Erosion Log 46,523 Lin Foot 275,947.50 5.93 208-00007 Erosion Log (8 Inch) 2,080 Lin Foot 26,980.00 12.97 208-00010 Erosion Bales 314 Each 14,032.00 44.69 208-00011 Erosion Bales (Weed Free) 4,812 Each 78,425.62 16.30 208-00015 Sand Bag 220 Each 2,132.00 9.69 208-00018 Gravel Bag 280 Lin Foot 3,109.00 11.10 208-00020 Silt Fence 198,081 Lin Foot 296,562.65 1.50 208-00021 Silt Fence (Reinforced) 500 Lin Foot 1,300.00 2.60 208-00030 Sediment Basin 1 Each 2,200.00 2,200.00 208-00033 Sediment Trap 15 Each 14,700.00 980.00 208-00034 Gravel Bag 5,354 Lin Foot 51,159.00 9.56 208-00040 Check Dam 327 Each 45,732.50 139.85 208-00045 Concrete Washout Structure 239 Each 184,425.64 771.66 208-00050 Storm Drain Inlet Protection 499 Each 99,250.80 198.90 208-00051 Storm Drain Inlet Protection 2,073 Lin Foot 25,604.10 12.35 208-00055 Rigid Inlet Protection Device 5 Each 2,200.00 440.00 208-00060 Temporary Slope Drain 401 Lin Foot 13,014.20 32.45 208-00070 Stabilized Construction Entrance 197 Each 302,071.25 1,533.36 208-00100 Sediment Removal and Disposal 45 Lump Sum 217,594.86 4,835.44 208-00101 Sediment Removal and Disposal 310 Hour 30,357.00 97.93 208-00110 Sediment Removal and Disposal 1,055 Cubic Yard 29,378.40 27.85 208-00205 Erosion Control Supervisor 12,137 Hour 698,567.97 57.56 208-00206 Erosion Control Supervisor 2,519 Day 358,758.00 142.42 208-00300 Temporary Berms 11,100 Lin Foot 25,975.00 2.34 209-00000 Water 250 M Gallon 5,135.00 20.54 209-00100 Water (Landscaping) 206 M Gallon 10,300.00 50.00 209-00600 Dust Palliative (Magnesium Chloride) 116,966 Gallon 130,146.20 1.11 210-00001 Reset Structure 3 Each 9,500.00 3,166.67 210-00007 Reset Wheel Stop 12 Each 600.00 50.00 210-00010 Reset Mailbox Structure 8 Each 3,825.00 478.13 210-00011 Reset Mailbox Structure (Type 1) 54 Each 10,073.15 186.54 210-00012 Reset Mailbox Structure (Type 2) 22 Each 4,941.93 224.63 210-00013 Reset Mailbox Structure (Type 3) 15 Each 4,349.73 289.98 210-00014 Reset Mailbox Structure (Type 4) 5 Each 1,325.00 265.00 210-00015 Reset End Section 2 Each 380.00 190.00 Colorado Department of Transportation 15:09 Thursday, February 19, 2009 6 2008 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/08 THROUGH 12/31/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 210-00035 Reset Water Meter 4 Each 3,280.00 820.00 210-00050 Reset Fire Hydrant 3 Each 7,200.00 2,400.00 210-00065 Reset Monument (Type 3A) 4 Each 2,167.43 541.86 210-00090 Reset Delineator 620 Each 55,897.00 90.16 210-00410 Modify Bridge Expansion Device 2 Each 11,330.00 5,665.00 210-00425 Reset Bridge Railing 325 Lin Foot 5,475.00 16.85 210-00427 Reset Pipe Handrailing 8,405 Lin Foot 235,340.00 28.00 210-00440 Repair Curb 67 Lin Foot 5,517.45 82.35 210-00473 Reset TV Cameras 14 Each 37,180.00 2,655.71 210-00475 Reset Closed Circuit Television Pole 1 Each 1,530.00 1,530.00 210-00510 Rebuild Portions of Present Structure 4 Lump Sum 51,374.95 12,843.74 210-00520 Rebuild Portions of Present Structure 2 Sq Yard 4,443.60 2,221.80 210-00750 Reset Light Standard 73 Each 166,738.70 2,284.09 210-00760 Reset Luminaire 128 Each 334,080.00 2,610.00 210-00805 Reset Overhead Sign Structure 1 Each 11,500.00 11,500.00 210-00810 Reset Ground Sign 620 Each 121,343.62 195.72 210-00815 Reset Sign Panel 381 Each 12,325.05 32.35 210-00825 Reset Flashing Beacon 7 Each 10,891.90 1,555.99 210-00827 Reset Pull Box 6 Each 1,766.00 294.33 210-00830 Reset Traffic Signal Face 4 Each 726.00 181.50 210-00831 Reset Traffic Signal Head 8 Each 2,304.00 288.00 210-00848 Reset Traffic Signal Controller and Cabinet 5 Each 12,760.00 2,552.00 210-00860 Reset Pedestrian Push Button 2 Each 180.00 90.00 210-00865 Reset Pedestrian Signal Head 2 Each 410.00 205.00 210-00866 Reset Fire Preemption Unit and Timer 14 Each 8,978.00 641.29 210-00870 Reset Coordination Unit 2 Each 12,230.00 6,115.00 210-00890 Reset Intersection Detection System (Camera) 3 Each 3,400.00 1,133.33 210-00910 Reset Traffic Counter (Permanent) 1 Each 3,700.00 3,700.00 210-01000 Reset Fence 1,512 Lin Foot 5,982.80 3.96 210-01011 Reset Gate 6 Each 3,292.13 548.69 210-01050 Reset Chain Link Fence 80 Lin Foot 2,240.00 28.00 210-01130 Reset Guardrail Type 3 35,683 Lin Foot 411,523.35 11.53 210-01136 Reset Guardrail Type 3 (Double) 5,125 Lin Foot 71,750.00 14.00 210-01140 Reset Guardrail Type 4 1,350 Lin Foot 17,077.50 12.65 210-01170 Reset Guardrail Type 7 1,500 Lin Foot 14,625.00 9.75 210-01200 Reset End Anchorage 68 Each 20,020.00 294.41 210-01300 Reset Impact Attenuator 6 Each 15,300.00 2,550.00 210-01700 Reset Sprinkler Head 4 Each 420.00 105.00 Colorado Department of Transportation 15:09 Thursday, February 19, 2009 7 2008 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/08 THROUGH 12/31/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 210-01710 Reset Valve 1 Each 1,900.00 1,900.00 210-01720 Reset Air Vent 3 Each 3,900.00 1,300.00 210-02024 Relay Pipe (24 Inch) 125 Lin Foot 3,843.75 30.75 210-02048 Relay Pipe (48 Inch) 170 Lin Foot 6,621.50 38.95 210-02900 Relay Riprap 57 Cubic Yard 1,559.10 27.35 210-03100 Replace Concrete Pavement 2,005 Sq Yard 439,320.00 219.11 210-04000 Adjust Structure 21 Each 16,674.00 794.00 210-04010 Adjust Manhole 363 Each 190,352.90 524.39 210-04011 Adjust Manhole (Special) 8 Each 5,560.40 695.05 210-04015 Modify Manhole 16 Each 23,499.12 1,468.70 210-04016 Modify Manhole (Special) 2 Each 5,200.00 2,600.00 210-04020 Modify Inlet 62 Each 185,197.43 2,987.06 210-04025 Modify Structure 2 Each 5,486.00 2,743.00 210-04030 Modify Guardrail 31,415 Lin Foot 116,866.30 3.72 210-04050 Adjust Valve Box 493 Each 150,673.46 305.63 210-04060 Adjust Water Meter 1 Each 820.00 820.00 210-04070 Adjust Well 6 Each 6,600.00 1,100.00 210-04200 Adjust Guardrail 57,168 Lin Foot 141,649.20 2.48 211-00100 Drilling Hole 2,324 Lin Foot 127,964.00 55.06 211-01111 Rock Reinforcement (Dowels) 200 Lin Foot 14,000.00 70.00 211-01115 Rock Reinforcement (Number 10) 598 Lin Foot 60,421.92 101.04 211-01123 Rock Reinforcement (Permanent A) 175 Lin Foot 8,750.00 50.00 211-01124 Rock Reinforcement (Permanent B) 175 Lin Foot 8,750.00 50.00 211-01190 Optical Survey Targets 5 Each 8,000.00 1,600.00 211-01300 Rock Anchor 40 Each 16,240.00 406.00 211-03005 Dewatering 1 Lump Sum 134,000.00 134,000.00 212-00006 Seeding (Native) 734 Acre 396,772.95 540.56 212-00007 Seeding (Native) (Hydraulic) 1 Acre 1,000.00 1,000.00 212-00009 Seeding (Temporary) 22 Acre 5,343.25 242.88 212-00028 Seeding (Wetlands) 1 Acre 735.25 735.25 212-00032 Soil Conditioning 419 Acre 791,566.10 1,889.18 212-00050 Sod 2,327 Sq Foot 5,817.50 2.50 213-00002 Mulching (Weed Free Hay) 481 Acre 235,232.77 489.05 213-00003 Mulching (Weed Free) 315 Acre 104,419.75 331.49 213-00004 Mulching (Weed Free Straw) 119 Acre 81,819.07 687.56 213-00005 Mulching (Decorative) 1,758 Cubic Foot 11,427.00 6.50 213-00008 Mulching (Wood Chip) 80 Cubic Foot 200.00 2.50 213-00009 Flexible Growth Medium 8 Acre 27,240.00 3,405.00 Colorado Department of Transportation 15:09 Thursday, February 19, 2009 8 2008 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/08 THROUGH 12/31/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 213-00011 Mulching (Hydraulic) 3 Acre 4,000.00 1,333.33 213-00061 Mulch Tackifier 185,798 Pound 369,623.20 1.99 213-00100 Soil Binder 101 Acre 48,664.72 481.83 213-00460 Metal Landscape Border (3/16x4 Inch) 603 Lin Foot 2,653.20 4.40 213-00462 Metal Landscape Border (3/16 X 5-1/2 Inch) 526 Lin Foot 4,734.00 9.00 213-00610 Landscape Log 20 Each 3,800.00 190.00 213-00700 Landscape Boulder 247 Each 43,000.00 174.09 213-00705 Landscape Boulder (Special) 60 Each 16,200.00 270.00 214-00000 Landscape Maintenance 5 Lump Sum 58,750.00 11,750.00 214-00205 Deciduous Tree (5 Gallon Container) 939 Each 55,994.00 59.63 214-00215 Deciduous Tree (1.5 Inch Caliper) 27 Each 8,550.00 316.67 214-00220 Deciduous Tree (2 Inch Caliper) 59 Each 20,397.50 345.72 214-00350 Deciduous Shrub (5 Gallon Container) 1,724 Each 58,938.75 34.19 214-00450 Evergreen Tree (5 Gallon Container) 75 Each 7,275.00 97.00 214-00506 Evergreen Tree (6 Foot) (Ball and Burlap) 47 Each 14,828.00 315.49 214-00650 Evergreen Shrub (5 Gallon Container) 6 Each 2,760.00 460.00 214-01010 Brush Layer Cutting 6,651 Each 21,316.90 3.21 215-00000 Transplant Shrub 657 Each 39,896.00 60.72 215-00010 Transplant Tree 21 Each 12,900.00 614.29 215-00600 Transplant Plug 425 Each 14,074.50 33.12 216-00015 Soil Retention Blanket (Excelsior) 10,194 Sq Yard 24,942.00 2.45 216-00021 Soil Retention Blanket (Class 1) 23,153 Sq Yard 40,350.10 1.74 216-00022 Soil Retention Blanket (Class 2) 7,882 Sq Yard 42,483.98 5.39 216-00023 Soil Retention Blanket (Class 3) 938 Sq Yard 5,684.00 6.06 216-00035 Soil Retention Blanket (Plastic) 1,778 Sq Yard 13,718.50 7.72 216-00037 Soil Retention Blanket (Coconut) 244 Sq Yard 891.00 3.65 216-00039 Soil Retention Blanket (Straw) 23,390 Sq Yard 37,059.80 1.58 216-00041 Soil Retention Blanket (Straw/Coconut) 247,989 Sq Yard 482,254.14 1.94 216-00045 Soil Retention Mat (Cellular) 2,080 Sq Yard 18,720.00 9.00 216-00070 Geocell Cellular Confinement System 1,084 Sq Yard 27,100.00 25.00 217-00000 Herbicide Treatment 3,600 Sq Yard 1,810.00 0.50 217-00020 Herbicide Treatment 204 Hour 19,400.00 95.10 218-00000 Noxious Weed Management 1 Lump Sum 5,000.00 5,000.00 240-00000 Wildlife Biologist 40 Hour 3,120.00 78.00 250-00010 Environmental Health and Safety Management 10 Lump Sum 62,338.25 6,233.83 250-00050 Monitoring Technician 274 Hour 25,959.60 94.74 250-00110 Health and Safety Officer 228 Hour 28,896.00 126.74 250-00120 Material Sampling and Delivery 51 Each 12,680.00 248.63 Colorado Department of Transportation 15:09 Thursday, February 19, 2009 9 2008 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/08 THROUGH 12/31/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 250-00200 Material Handling (Stockpile) 276 Cubic Yard 10,000.00 36.23 250-00210 Solid Waste Disposal 208 Cubic Yard 13,252.00 63.71 250-00220 Hazardous Waste Disposal 21,406 Cubic Yard 1,187,250.00 55.46 250-00310 Water Treatment 60 M Gallon 31,800.00 530.00 304-01000 Aggregate Base Course (Class 1) 65,399 Ton 1,118,211.00 17.10 304-01005 Aggregate Base Course (Class 1) 16 Cubic Yard 1,600.00 100.00 304-02000 Aggregate Base Course (Class 2) 134,480 Ton 1,892,896.82 14.08 304-03000 Aggregate Base Course (Class 3) 3,637 Ton 116,420.37 32.01 304-03005 Aggregate Base Course (Class 3) 7,280 Cubic Yard 255,600.80 35.11 304-04000 Aggregate Base Course (Class 4) 4,366 Ton 53,289.00 12.21 304-05000 Aggregate Base Course (Class 5) 279 Ton 15,624.00 56.00 304-06000 Aggregate Base Course (Class 6) 208,857 Ton 3,945,967.67 18.89 304-06007 Aggregate Base Course (Class 6) 58,658 Cubic Yard 1,382,740.21 23.57 304-06008 Aggregate Base Course (Class 6) (Special) 12,903 Cubic Yard 295,809.12 22.93 304-06009 Aggregate Base Course (Class 6) (Special) 5,998 Ton 110,663.10 18.45 304-07000 Aggregate Base Course (Class 7) 15,096 Ton 364,887.80 24.17 304-07005 Aggregate Base Course (Class 7) 17,034 Cubic Yard 176,349.84 10.35 304-07009 Aggregate Base Course (Class 7) (Special) 982 Ton 982.00 1.00 304-09000 Aggregate Base Course (Special) 6,895 Cubic Yard 99,694.00 14.46 304-09014 Aggregate Base Course (Special) 75,088 Ton 1,546,089.99 20.59 304-09055 Aggregate Base Course (Blotter Material) 65 Ton 1,030.00 15.85 306-01000 Reconditioning 3,451 Sq Yard 20,706.00 6.00 307-00000 Hydrated Lime 2,008 Ton 302,292.25 150.54 307-00075 Fly Ash 470 Ton 37,600.00 80.00 307-00250 Processing Fly Ash Treated Subgrade 11,496 Sq Yard 21,842.40 1.90 310-00608 Full Depth Reclamation of Hot Mix Asphalt Pavement (0 178,789 Sq Yard 395,222.92 2.21 310-00610 Full Depth Reclamation of Hot Mix Asphalt Pavement (8 113,452 Sq Yard 277,986.30 2.45 310-00614 Full Depth Reclamation Of Hot Mix Asphalt Pavement (1 54,554 Sq Yard 294,764.40 5.40 403-00720 Hot Bituminous Pavement (Patching) (Asphalt) 16,238 Ton 2,212,924.28 136.28 403-00721 Hot Bituminous Pavement (Patching) (Asphalt) 13,274 Sq Yard 643,384.75 48.47 403-00800 Emergency Pothole Repair 160 Ton 15,417.10 96.36 403-05000 Hot Mix Asphalt (Reflective Crack Interlayer) 12,232 Ton 1,565,696.00 128.00 403-09210 Stone Matrix Asphalt 118,387 Ton 8,442,819.64 71.32 403-09221 Stone Matrix Asphalt (Fibers)(Asphalt) 54,596 Ton 3,349,448.12 61.35 403-09500 Furnish Hot Bituminous Pavement 37,955 Ton 2,813,940.24 74.14 403-33721 Hot Bituminous Pavement (Grading S) (75) (PG 58-28) 3,144 Ton 235,800.00 75.00 403-33741 Hot Bituminous Pavement (Grading S) (75) (PG 64-22) 38,294 Ton 2,608,387.56 68.11 403-33751 Hot Bituminous Pavement (Grading S) (75) (PG 64-28) 13,341 Ton 869,103.90 65.15 Colorado Department of Transportation 15:09 Thursday, February 19, 2009 10 2008 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/08 THROUGH 12/31/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 403-33841 Hot Bituminous Pavement (Grading S) (100) (PG 64-22) 74,299 Ton 3,769,578.00 50.74 403-34701 Hot Bituminous Pavement (Grading SX) (75) 305,222 Ton 13,994,917.31 45.85 403-34721 Hot Bituminous Pavement (Grading SX) (75) (PG 58-28) 148,059 Ton 9,659,026.45 65.24 403-34741 Hot Bituminous Pavement (Grading SX) (75) (PG 64-22) 27,780 Ton 2,053,444.88 73.92 403-34751 Hot Bituminous Pavement (Grading SX) (75) (PG 64-28) 41,066 Ton 2,043,177.92 49.75 403-34801 Hot Bituminous Pavement (Grading SX) (100) 39,828 Ton 1,943,157.00 48.79 403-34841 Hot Bituminous Pavement (Grading SX) (100) (PG 64-22) 112,823 Ton 6,337,095.54 56.17 403-34851 Hot Bituminous Pavement (Grading SX) (100) (PG 64-28) 248,864 Ton 14,180,702.60 56.98 403-34871 Hot Bituminous Pavement (Grading SX) (100) (PG 76-28) 225,749 Ton 13,531,346.98 59.94 403-36400 Hot Bituminous Pavement (Grading SX) (75) 40,815 Ton 2,163,195.00 53.00 405-00000 Heating and Scarifying Treatment 309,881 Sq Yard 712,726.30 2.30 405-00100 Heating and Remixing Treatment 1,234,256 Sq Yard 6,932,788.03 5.62 405-00101 Heating and Remixing Treatment (Special) 184,895 Sq Yard 1,444,029.95 7.81 405-00300 Heating and Repaving Treatment 275,913 Sq Yard 827,739.00 3.00 406-09500 Cold Bituminous Pavement (Recycle) 211,623 Sq Yard 534,930.00 2.53 406-09505 Cold Bituminous Pavement (Recycle)(Special) 257,547 Sq Yard 659,320.32 2.56 408-01000 Hot Poured Joint and Crack Sealant 56 Ton 35,696.77 637.44 408-01400 Crack Sealant (Special) 51 Ton 190,536.00 3,736.00 409-01010 Cover Coat Material (Type I) 5,644 Ton 84,660.00 15.00 409-01015 Cover Coat Material (Type I) 896,014 Sq Yard 652,088.87 0.73 409-02015 Cover Coat Material (Type II) 248,421 Sq Yard 124,210.50 0.50 409-02030 Cover Coat Material (Type I) Special 758,285 Sq Yard 1,101,525.45 1.45 411-03342 Asphalt Cement Performance Grade (PG 64-28) 5,486 Ton 2,924,731.40 533.13 411-03345 Asphalt Cement Performance Grade (PG 76-28) 1,904 Ton 920,475.00 483.44 411-03352 Asphalt Cement Performance Grade (PG 58-28) 2,307 Ton 1,043,535.88 452.33 411-03354 Asphalt Cement Performance Grade (PG 64-22) 2,870 Ton 1,641,045.76 571.79 411-03355 Asphalt Cement Performance Grade (PG 58-34) 15,124 Ton 7,978,620.45 527.55 411-10216 Emulsified Asphalt (CRS-2P) 181,380 Gallon 576,788.40 3.18 411-10253 Emulsified Asphalt (CSS-1H) 19,354 Gallon 37,958.00 1.96 411-10255 Emulsified Asphalt (Slow-Setting) 538,392 Gallon 1,237,513.63 2.30 411-10258 Emulsified Asphalt (Rapid-Setting)(Polymerized) 2,103 Ton 780,104.00 370.95 411-10259 Emulsified Asphalt (Medium-Setting)(Polymerized) 92 Ton 62,100.00 675.00 411-10261 Emulsified Asphalt (Rapid-Setting-2P)(Polymerized) 143,608 Gallon 193,870.80 1.35 411-10275 Emulsified Asphalt (HFMS-2P) (High Float) (Polymerize 310,779 Gallon 677,553.55 2.18 411-10300 Emulsified Asphalt (Prime Coat) 48,422 Gallon 121,704.38 2.51 411-21020 Liquid Asphaltic Material (MC-70) 13,844 Gallon 74,663.20 5.39 411-90010 Asphalt Rejuvenating Agent 184,864 Gallon 581,816.02 3.15 411-90040 Recycling Agent 939,770 Gallon 2,192,018.04 2.33 Colorado Department of Transportation 15:09 Thursday, February 19, 2009 11 2008 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/08 THROUGH 12/31/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 412-00600 Concrete Pavement (6 Inch) 6,254 Sq Yard 362,088.20 57.90 412-00605 Concrete Pavement (6 Inch) (Fast Track) 240 Sq Yard 10,972.80 45.72 412-00850 Concrete Pavement (8-1/2 Inch) 117,058 Sq Yard 3,952,995.00 33.77 412-00900 Concrete Pavement (9 Inch) 198,891 Sq Yard 4,816,248.36 24.22 412-00920 Concrete Pavement (9 Inch) (Fast Track) 12,016 Sq Yard 465,853.64 38.77 412-00950 Concrete Pavement (9-1/2 Inch) 27,599 Sq Yard 938,366.00 34.00 412-01000 Concrete Pavement (10 Inch) 14,262 Sq Yard 660,171.00 46.29 412-01020 Concrete Pavement (10 Inch) (Fast Track) 12,313 Sq Yard 868,380.00 70.53 412-01025 Concrete Pavement (10-1/4 Inch) 130,433 Sq Yard 5,114,198.35 39.21 412-01035 Concrete Pavement (10 1/4 Inch)(Fast Track) 5,000 Sq Yard 325,000.00 65.00 412-01050 Concrete Pavement (10-1/2 Inch) 81,187 Sq Yard 3,333,534.99 41.06 412-01060 Concrete Pavement (10-1/2 Inch) (Fast Track) 335 Sq Yard 23,282.50 69.50 412-01100 Concrete Pavement (11 Inch) 333,747 Sq Yard 10,219,749.31 30.62 412-01120 Concrete Pavement (11 Inch) (Fast Track) 970 Sq Yard 114,178.00 117.71 412-01125 Concrete Pavement (11-1/4 Inch) 53,818 Sq Yard 2,433,111.78 45.21 412-01150 Concrete Pavement (11-1/2 Inch) 3,201 Sq Yard 192,060.00 60.00 412-01200 Concrete Pavement (12 Inch) 62,581 Sq Yard 2,380,438.84 38.04 412-01215 Concrete Pavement (12 Inch) (Reinforced) 676 Sq Yard 37,180.00 55.00 412-01220 Concrete Pavement (12 Inch) (Fast Track) 2,340 Sq Yard 280,800.00 120.00 412-01250 Concrete Pavement (12-1/2 Inch) 103,698 Sq Yard 4,676,914.80 45.10 412-14000 Sawing and Sealing Concrete Pavement Joints 116,000 Lin Foot 203,000.00 1.75 412-15000 Routing and Sealing Concrete Pavement Cracks 420 Lin Foot 2,226.00 5.30 412-15010 Cleaning and Grouting Concrete Pavement Joint 500 Lin Foot 2,500.00 5.00 412-15050 Cross Stitching 900 Each 41,400.00 46.00 412-18050 Rubblization of Concrete Pavement 321,092 Sq Yard 1,139,876.60 3.55 412-19000 Hot Poured Concrete Joint Sealant 1,500 Lin Foot 29,565.00 19.71 420-00000 Geomembrane 363 Sq Yard 2,359.50 6.50 420-00100 Geotextile (Erosion Control) (Class A) 31,268 Sq Yard 85,584.31 2.74 420-00101 Geotextile (Erosion Control) (Class B) 1,940 Sq Yard 14,500.00 7.47 420-00110 Geotextile (Drainage) (Class A) 20,779 Sq Yard 54,028.74 2.60 420-00111 Geotextile (Drainage) (Class B) 374 Sq Yard 1,709.18 4.57 420-00130 Geotextile (Separator) (Class A) 136,320 Sq Yard 239,717.56 1.76 420-00131 Geotextile (Separator) (Class B) 238 Sq Yard 2,380.00 10.00 420-00200 Geotextile (Weed Barrier) 959 Sq Yard 43,374.00 45.23 420-00500 Geotextile (Paving) 10,455 Sq Yard 26,697.95 2.55 501-00000 Steel Sheet Piling (Type I) 720 Sq Foot 33,991.20 47.21 502-00100 Drilling Hole to Facilitate Pile Driving 1,794 Lin Foot 279,760.00 155.94 502-00460 Pile Tip 294 Each 39,283.20 133.62 Colorado Department of Transportation 15:09 Thursday, February 19, 2009 12 2008 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/08 THROUGH 12/31/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 502-01000 Bitumen Coating 352 Lin Foot 8,800.00 25.00 502-11253 Steel Piling (HP 12x53) 4,649 Lin Foot 274,207.00 58.98 502-11274 Steel Piling (HP 12x74) 1,489 Lin Foot 115,740.00 77.73 502-11284 Steel Piling (HP 12x84) 334 Lin Foot 18,370.00 55.00 502-11489 Steel Piling (HP 14x89) 7,458 Lin Foot 438,774.56 58.83 503-00018 Drilled Caisson (18 Inch) 314 Lin Foot 61,029.04 194.36 503-00024 Drilled Caisson (24 Inch) 2,579 Lin Foot 372,877.42 144.58 503-00030 Drilled Caisson (30 Inch) 1,565 Lin Foot 254,400.00 162.56 503-00036 Drilled Caisson (36 Inch) 1,189 Lin Foot 274,692.90 231.03 503-00042 Drilled Caisson (42 Inch) 768 Lin Foot 188,815.35 245.85 503-00048 Drilled Caisson (48 Inch) 1,488 Lin Foot 439,318.86 295.24 503-00054 Drilled Caisson (54 Inch) 458 Lin Foot 198,722.01 433.89 503-00060 Drilled Caisson (60 Inch) 120 Lin Foot 48,000.00 400.00 504-03411 Retaining Wall (Boulder) 4,350 Sq Foot 143,550.00 33.00 504-04410 Block Facing 33,153 Sq Foot 394,606.76 11.90 504-04420 Precast Panel Facing 44,845 Sq Foot 1,475,292.00 32.90 504-04430 Reinforced Concrete Facing 16,000 Sq Foot 612,000.00 38.25 504-06310 Ground Nail (10 Foot) 118 Each 47,010.00 398.39 504-06315 Ground Nail (15 Foot) 179 Each 101,995.00 569.80 504-06320 Ground Nail (20 Foot) 304 Each 227,816.00 749.39 504-06325 Ground Nail (25 Foot) 136 Each 95,200.00 700.00 504-06330 Ground Nail (30 Foot) 110 Each 91,300.00 830.00 504-08255 Masonry Landscape Wall (Dry Stack) 4,780 Sq Foot 109,190.00 22.84 506-00000 Riprap 210 Cubic Yard 17,850.00 85.00 506-00010 Riprap (Special) 15,539 Cubic Yard 737,839.15 47.48 506-00013 Riprap (Special) 9,405 Ton 794,709.75 84.50 506-00030 Grouted Riprap 622 Cubic Yard 109,124.50 175.44 506-00206 Riprap (6 Inch) 883 Cubic Yard 68,596.40 77.69 506-00209 Riprap (9 Inch) 4,050 Cubic Yard 298,946.54 73.81 506-00212 Riprap (12 Inch) 2,742 Cubic Yard 209,276.54 76.32 506-00218 Riprap (18 Inch) 1,777 Cubic Yard 140,665.50 79.16 506-00224 Riprap (24 Inch) 25,006 Cubic Yard 1,240,230.60 49.60 506-00230 Riprap (30 In) 340 Cubic Yard 61,288.40 180.26 506-00236 Riprap (36 Inch) 80 Cubic Yard 20,560.00 257.00 506-01020 Geogrid Reinforcement 25,648 Sq Yard 94,638.19 3.69 507-00000 Concrete Slope and Ditch Paving 600 Cubic Yard 215,950.94 359.92 507-00100 Concrete Slope and Ditch Paving (Reinforced) 1,121 Cubic Yard 488,049.88 435.37 507-00400 Bituminous Slope and Ditch Paving (Asphalt) 805 Ton 147,941.56 183.78 Colorado Department of Transportation 15:09 Thursday, February 19, 2009 13 2008 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/08 THROUGH 12/31/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 509-00000 Structural Steel 580,186 Pound 958,151.00 1.65 509-00001 Structural Steel (Galvanized) 1,901 Pound 4,562.40 2.40 509-00010 Structural Steel (Special) 67,830 Pound 176,358.00 2.60 509-08100 Provide Temporary Support 2 Lump Sum 2,386,500.00 1,193,250.00 509-08120 Temporary Bridge Deck 7,751 Sq Foot 883,323.80 113.96 509-90002 Paint Existing Structure (Special) 10 Gallon 4,000.00 400.00 510-20100 Structural Plate Arch (Special) 27 Lin Foot 14,850.00 550.00 512-00101 Bearing Device (Type I) 139 Each 109,850.00 790.29 513-00600 Bridge Drain 6 Each 65,360.00 10,893.33 513-00690 Bridge Drain (Special) 78 Each 373,898.84 4,793.57 514-00000 Pipe Railing 147 Lin Foot 19,204.25 130.64 514-00100 Hand Rail 216 Lin Foot 47,725.00 220.95 514-00200 Pedestrian Railing (Steel) 951 Lin Foot 111,183.00 116.91 515-00120 Waterproofing (Membrane) 22,389 Sq Yard 344,990.97 15.41 515-00400 Concrete Sealer 28,429 Sq Yard 226,326.21 7.96 515-00410 Concrete Sealer (Calcium Nitrite) 7,611 Sq Yard 165,194.27 21.70 518-00100 Waterstop 682 Lin Foot 4,242.04 6.22 518-01001 Bridge Expansion Joint (Asphaltic Plug) 60 Lin Foot 9,270.60 154.51 518-01002 Bridge Expansion Device (0-2 Inch) 1,961 Lin Foot 247,188.00 126.05 518-01004 Bridge Expansion Device (0-4 Inch) 3,656 Lin Foot 979,360.66 267.88 518-01005 Bridge Expansion Device (0-4 Inch)(with Snow Plow Pla 343 Lin Foot 80,480.00 234.64 518-02010 Elastomeric Concrete End Dam 4 Cubic Foot 6,600.00 1,650.00 518-02100 Polymer Mortar End Dam 301 Cubic Foot 169,577.88 563.38 518-03000 Sawing and Sealing Bridge Joint 3,166 Lin Foot 64,614.72 20.41 518-03100 Rapid Cure Silicone Joint Seal 700 Lin Foot 36,576.36 52.25 519-01000 Epoxy Resin (Injection) 1,465 Lin Foot 141,860.00 96.83 519-01200 Epoxy Mortar (Patching) 24 Cubic Foot 8,796.60 366.53 519-03000 Thin Bonded Epoxy Overlay 1,557 Sq Yard 68,757.12 44.16 601-01000 Concrete Class B 1,609 Cubic Yard 974,562.80 605.69 601-01025 Concrete Class B (Miscellaneous) 73 Cubic Yard 29,908.38 409.70 601-01050 Concrete Class B (Wall) 145 Cubic Yard 101,252.76 698.29 601-03000 Concrete Class D 292 Cubic Yard 169,615.00 580.87 601-03020 Concrete Class D (Miscellaneous) 27 Cubic Yard 27,876.00 1,032.44 601-03030 Concrete Class D (Box Culvert) 4,143 Cubic Yard 1,608,500.30 388.25 601-03040 Concrete Class D (Bridge) 12,041 Cubic Yard 5,212,648.92 432.91 601-03041 Concrete Class D (Bridge) (Special) 819 Cubic Yard 1,174,645.00 1,434.24 601-03050 Concrete Class D (Wall) 1,070 Cubic Yard 510,850.00 477.43 601-03540 Concrete Class DT (Deck Topping) 19 Cubic Yard 31,464.68 1,656.04 Colorado Department of Transportation 15:09 Thursday, February 19, 2009 14 2008 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/08 THROUGH 12/31/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 601-04000 Concrete Class E 43 Cubic Yard 44,075.00 1,025.00 601-05000 Concrete Class H 3,542 Cubic Yard 1,580,520.20 446.22 601-06100 Concrete (Patching) 144 Cubic Yard 318,963.00 2,215.02 601-06150 Concrete (Patching) 6,330 Sq Foot 321,984.62 50.87 601-06300 Cement Grout 4,800 Cubic Foot 180,000.00 37.50 601-21004 Precast Wall Segment (Furnish Only 3,513 Sq Foot 70,786.95 20.15 601-25900 Tile-Faced Precast Concrete Panels 203,554 Sq Foot 5,717,831.86 28.09 601-40100 Concrete Anchor 410 Each 19,475.00 47.50 601-40250 Bridge Deck Finish (Sawed Grooves) 5,626 Sq Yard 25,317.00 4.50 601-40300 Structural Concrete Coating 9,815 Sq Yard 74,135.10 7.55 601-40301 Structural Concrete Coating 37,887 Sq Foot 51,608.94 1.36 601-40302 Structural Concrete Coating (Anti-Graffiti) 3,067 Sq Foot 24,536.00 8.00 601-40400 Structural Concrete Stain 19,007 Sq Yard 107,618.75 5.66 601-40401 Structural Concrete Stain 2,964 Sq Foot 4,446.00 1.50 602-00000 Reinforcing Steel 1,458,340 Pound 1,740,262.73 1.19 602-00020 Reinforcing Steel (Epoxy Coated) 3,248,444 Pound 3,210,367.00 0.99 602-00030 Reinforcing (Fiber Reinforced Polymer)(Surface) 9 M Kip Foot 32,199.62 3,577.74 602-00060 Reinforcing Steel Splice 2,590 Each 771,820.00 298.00 602-00070 Reinf (Fiber Reinforcement)(Surface) 43 M Kip Foot 90,300.00 2,100.00 603-00001 Annular Space Grouting 85 Cubic Yard 27,625.00 325.00 603-00040 Culvert Lining (40 Inch) 270 Lin Foot 52,650.00 195.00 603-00049 Culvert Lining (48 Inch)(Special) 384 Lin Foot 142,080.00 370.00 603-00053 Prepare Culvert Pipe (54 Inch) 1,943 Lin Foot 19,430.00 10.00 603-00054 Culvert Lining (54 Inch) 1,943 Lin Foot 429,403.00 221.00 603-00061 Prepare Culvert Pipe (60 Inch) 250 Lin Foot 46,250.00 185.00 603-00062 Culvert Lining (60 Inch)(Special) 94 Lin Foot 57,810.00 615.00 603-00072 Culvert Lining (72 Inch) 135 Lin Foot 189,000.00 1,400.00 603-01125 12 Inch Reinforced Concrete Pipe (Complete In Place) 152 Lin Foot 9,316.00 61.29 603-01155 15 Inch Reinforced Concrete Pipe (Complete In Place) 476 Lin Foot 13,661.20 28.70 603-01180 18 Inch Reinforced Concrete Pipe 6,906 Lin Foot 325,172.12 47.09 603-01185 18 Inch Reinforced Concrete Pipe (Complete In Place) 8,272 Lin Foot 366,924.05 44.36 603-01240 24 Inch Reinforced Concrete Pipe 4,553 Lin Foot 270,927.76 59.51 603-01245 24 Inch Reinforced Concrete Pipe (Complete In Place) 12,216 Lin Foot 677,029.36 55.42 603-01300 30 Inch Reinforced Concrete Pipe 4,336 Lin Foot 311,908.82 71.93 603-01305 30 Inch Reinforced Concrete Pipe (Complete In Place) 2,893 Lin Foot 222,894.08 77.05 603-01360 36 Inch Reinforced Concrete Pipe 1,110 Lin Foot 99,092.90 89.27 603-01365 36 Inch Reinforced Concrete Pipe (Complete In Place) 4,030 Lin Foot 436,071.84 108.21 603-01420 42 Inch Reinforced Concrete Pipe 940 Lin Foot 99,581.65 105.94 Colorado Department of Transportation 15:09 Thursday, February 19, 2009 15 2008 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/08 THROUGH 12/31/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 603-01425 42 Inch Reinforced Concrete Pipe (Complete In Place) 1,225 Lin Foot 200,285.00 163.50 603-01480 48 Inch Reinforced Concrete Pipe 1,400 Lin Foot 174,956.84 124.97 603-01485 48 Inch Reinforced Concrete Pipe (Complete In Place) 1,455 Lin Foot 265,666.96 182.59 603-01540 54 Inch Reinforced Concrete Pipe 171 Lin Foot 17,173.53 100.43 603-01545 54 Inch Reinforced Concrete Pipe (Complete In Place) 257 Lin Foot 36,037.21 140.22 603-01600 60 Inch Reinforced Concrete Pipe 548 Lin Foot 96,420.00 175.95 603-01605 60 Inch Reinforced Concrete Pipe (Complete In Place) 229 Lin Foot 50,518.00 220.60 603-01720 72 Inch Reinforced Concrete Pipe 214 Lin Foot 74,790.00 349.49 603-02180 23x14 Inch Reinforced Concrete Pipe Elliptical 380 Lin Foot 34,854.40 91.72 603-02185 23x14 Inch Reinforced Concrete Pipe (Complete In Plac 128 Lin Foot 19,200.00 150.00 603-02240 30x19 Inch Reinforced Concrete Pipe Elliptical 38 Lin Foot 3,161.60 83.20 603-02245 30x19 Inch Reinforced Concrete Pipe Elliptical 275 Lin Foot 36,459.80 132.58 603-02305 38x24 Inch Reinforced Concrete Pipe Elliptical 263 Lin Foot 24,676.40 93.83 603-02365 45x29 Inch Reinforced Concrete Pipe Elliptical 1,308 Lin Foot 237,669.78 181.70 603-02425 53x34 Inch Reinforced Concrete Pipe Elliptical 29 Lin Foot 4,930.00 170.00 603-02480 60x38 Inch Reinforced Concrete Pipe Elliptical 295 Lin Foot 62,845.00 213.03 603-02485 60x38 Inch Reinforced Concrete Pipe Elliptical (CIP) 102 Lin Foot 19,125.00 187.50 603-02545 68x43 Inch Reinforcement Concrete Pipe Elliptical 152 Lin Foot 50,160.00 330.00 603-05015 15 Inch Reinforced Concrete End Section 1 Each 698.03 698.03 603-05018 18 Inch Reinforced Concrete End Section 37 Each 26,134.28 706.33 603-05024 24 Inch Reinforced Concrete End Section 107 Each 95,671.38 894.13 603-05030 30 Inch Reinforced Concrete End Section 22 Each 21,339.55 969.98 603-05036 36 Inch Reinforced Concrete End Section 45 Each 71,552.68 1,590.06 603-05042 42 Inch Reinforced Concrete End Section 4 Each 11,783.11 2,945.78 603-05048 48 Inch Reinforced Concrete End Section 10 Each 18,300.00 1,830.00 603-05054 54 Inch Reinforced Concrete End Section 4 Each 8,281.62 2,070.41 603-05060 60 Inch Reinforced Concrete End Section 2 Each 3,842.38 1,921.19 603-05118 23x14 Inch Reinforced Concrete End Section Elliptical 2 Each 1,141.00 570.50 603-05124 30x19 Inch Reinforced Concrete End Section Elliptical 4 Each 5,641.99 1,410.50 603-05130 38x24 Inch Reinforced Concrete End Section Elliptical 8 Each 15,817.08 1,977.14 603-05136 45x29 Inch Reinforced Concrete End Section Elliptical 5 Each 9,910.76 1,982.15 603-05148 60x38 Inch Reinforced Concrete End Section Elliptical 6 Each 11,960.34 1,993.39 603-05154 68x43 Inch Reinforced Concrete End Section Elliptical 1 Each 2,600.00 2,600.00 603-10120 12 Inch Corrugated Steel Pipe 183 Lin Foot 7,667.00 41.90 603-10150 15 Inch Corrugated Steel Pipe 15 Lin Foot 4,240.05 282.67 603-10151 15 Inch Corrugated Steel Pipe (Install Only) 52 Lin Foot 2,236.00 43.00 603-10180 18 Inch Corrugated Steel Pipe 3,189 Lin Foot 193,151.10 60.57 603-10240 24 Inch Corrugated Steel Pipe 5,340 Lin Foot 473,602.10 88.69 Colorado Department of Transportation 15:09 Thursday, February 19, 2009 16 2008 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/08 THROUGH 12/31/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 603-10300 30 Inch Corrugated Steel Pipe 492 Lin Foot 34,341.00 69.80 603-10360 36 Inch Corrugated Steel Pipe 1,128 Lin Foot 150,182.30 133.14 603-10480 48 Inch Corrugated Steel Pipe 352 Lin Foot 70,870.00 201.34 603-10600 60 Inch Corrugated Steel Pipe 244 Lin Foot 69,200.00 283.61 603-10720 72 Inch Corrugated Steel Pipe 22 Lin Foot 19,800.00 900.00 603-10840 84 Inch Corrugated Steel Pipe 27 Lin Foot 15,930.00 590.00 603-15024 24 Inch Equivalent Corrugated Steel Pipe Arch 543 Lin Foot 73,305.00 135.00 603-30018 18 Inch Steel End Section 98 Each 38,718.22 395.08 603-30024 24 Inch Steel End Section 191 Each 67,982.20 355.93 603-30030 30 Inch Steel End Section 8 Each 5,050.52 631.32 603-30036 36 Inch Steel End Section 53 Each 39,676.00 748.60 603-30048 48 Inch Steel End Section 7 Each 7,700.00 1,100.00 603-31324 24 Inch Equivalent Arch Steel End Section 20 Each 12,000.00 600.00 603-33030 30 Inch Pipe Safety End Treatment 58 Each 116,153.70 2,002.65 603-33036 36 Inch Pipe Safety End Treatment 10 Each 26,702.00 2,670.20 603-33048 48 Inch Pipe Safety End Treatment 10 Each 31,837.00 3,183.70 603-40072 72 Inch Corrugated Steel Pipe (Half Round)(Special) 130 Lin Foot 9,750.00 75.00 603-50002 2 Inch Plastic Pipe 200 Lin Foot 1,240.00 6.20 603-50004 4 Inch Plastic Pipe 96 Lin Foot 816.00 8.50 603-50006 6 Inch Plastic Pipe 623 Lin Foot 8,331.00 13.37 603-50008 8 Inch Plastic Pipe 3,535 Lin Foot 89,800.00 25.40 603-50012 12 Inch Plastic Pipe 447 Lin Foot 19,925.00 44.57 603-50015 15 Inch Plastic Pipe 276 Lin Foot 12,420.00 45.00 603-50018 18 Inch Plastic Pipe 1,454 Lin Foot 93,016.00 63.97 603-50024 24 Inch Plastic Pipe 108 Lin Foot 6,480.00 60.00 603-61180 18 Inch Flexible Pipe 55 Lin Foot 4,841.65 88.03 603-70607 6x7 Foot Concrete Box Culvert (Precast) 26 Lin Foot 31,200.00 1,200.00 603-70806 8x6 Foot Concrete Box Culvert (Precast) 35 Lin Foot 27,475.00 785.00 603-71604 16x4 Foot Concrete Box Culvert (3-Sided)(Precast) 32 Lin Foot 32,000.00 1,000.00 603-72010 20x10 Ft Concrete 3-sided Culvert (Precast) 102 Lin Foot 142,800.00 1,400.00 603-82006 6 Inch Ductile Iron Pipe 100 Lin Foot 15,500.00 155.00 603-82012 12 Inch Ductile Iron Pipe 180 Lin Foot 26,460.00 147.00 604-00305 Inlet Type C (5 Foot) 45 Each 143,340.93 3,185.35 604-00310 Inlet Type C (10 Foot) 13 Each 55,465.76 4,266.60 604-00315 Inlet Type C (15 Foot) 2 Each 8,300.00 4,150.00 604-00350 Inlet Type C (Special) 7 Each 66,606.86 9,515.27 604-00505 Inlet Type D (5 Foot) 10 Each 36,275.63 3,627.56 604-00506 Inlet Type D (Special) (5 Foot) 3 Each 13,500.00 4,500.00 Colorado Department of Transportation 15:09 Thursday, February 19, 2009 17 2008 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/08 THROUGH 12/31/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 604-00510 Inlet Type D (10 Foot) 22 Each 101,208.05 4,600.37 604-00511 Inlet Type D (Special) (10 Foot) 3 Each 27,200.00 9,066.67 604-00515 Inlet Type D (15 Foot) 1 Each 4,500.00 4,500.00 604-00550 Inlet Type D (Special) 6 Each 45,248.46 7,541.41 604-00605 Inlet Type D (Double) (5 Foot) 1 Each 5,520.00 5,520.00 604-13005 Inlet Type 13 (5 Foot) 1 Each 2,400.00 2,400.00 604-13010 Inlet Type 13 (10 Foot) 4 Each 11,200.00 2,800.00 604-13011 Inlet Type 13 (10 Foot) (Special) 1 Each 6,500.00 6,500.00 604-13015 Inlet Type 13 (15 Foot) 2 Each 9,200.00 4,600.00 604-16005 Inlet Type 16 (5 Foot) 2 Each 7,578.62 3,789.31 604-16510 Inlet Type 16 (Double) (10 Foot) 1 Each 4,200.00 4,200.00 604-19000 Inlet Special 1 Each 5,300.00 5,300.00 604-19005 Inlet Special (5 Foot) 6 Each 21,540.00 3,590.00 604-19010 Inlet Special (10 Foot) 1 Each 11,230.00 11,230.00 604-19105 Inlet Type R L 5 (5 Foot) 8 Each 26,320.00 3,290.00 604-19110 Inlet Type R L 5 (10 Foot) 8 Each 28,800.00 3,600.00 604-19205 Inlet Type R L 10 (5 Foot) 23 Each 103,240.00 4,488.70 604-19210 Inlet Type R L 10 (10 Foot) 13 Each 81,605.80 6,277.37 604-19215 Inlet Type R L 10 (15 Foot) 2 Each 14,320.00 7,160.00 604-19305 Inlet Type R L 15 (5 Foot) 10 Each 80,900.00 8,090.00 604-19310 Inlet Type R L 15 (10 Foot) 1 Each 4,930.00 4,930.00 604-19405 Inlet Type R Special (5 Foot) 2 Each 12,600.00 6,300.00 604-19410 Inlet Type R Special (10 Foot) 14 Each 97,400.00 6,957.14 604-19415 Inlet Type R Special (15 Foot) 1 Each 8,850.00 8,850.00 604-20000 Outlet Structure 19 Each 199,500.00 10,500.00 604-20001 Outlet Structure 1 Lump Sum 7,062.25 7,062.25 604-25000 Vane Grate Inlet Special 6 Each 22,800.00 3,800.00 604-25005 Vane Grate Inlet (5 Foot) 17 Each 60,785.00 3,575.59 604-25010 Vane Grate Inlet (10 Foot) 11 Each 90,041.50 8,185.59 604-25015 Vane Grate Inlet (15 Foot) 1 Each 4,500.00 4,500.00 604-26005 Vane Grate Inlet (Double) (5 Foot) 32 Each 125,300.00 3,915.63 604-26006 Vane Grate Inlet Special (Double) (5 Foot) 1 Each 4,200.00 4,200.00 604-26010 Vane Grate Inlet (Double) (10 Foot) 14 Each 69,600.00 4,971.43 604-26011 Vane Grate Inlet Special (Double) (10 Foot) 2 Each 8,600.00 4,300.00 604-26015 Vane Grate Inlet (Double) (15 Foot) 2 Each 9,200.00 4,600.00 604-30005 Manhole Slab Base (5 Foot) 16 Each 51,715.06 3,232.19 604-30010 Manhole Slab Base (10 Foot) 42 Each 140,187.15 3,337.79 604-30015 Manhole Slab Base (15 Foot) 23 Each 90,760.00 3,946.09 Colorado Department of Transportation 15:09 Thursday, February 19, 2009 18 2008 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/08 THROUGH 12/31/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 604-30020 Manhole Slab Base (20 Foot) 9 Each 85,800.00 9,533.33 604-30025 Manhole Slab Base (25 Foot) 4 Each 39,400.00 9,850.00 604-30030 Manhole Slab Base (30 Foot) 1 Each 11,200.00 11,200.00 604-31000 Manhole Box Base (Special) 1 Each 10,000.00 10,000.00 604-31005 Manhole Box Base (5 Foot) 1 Each 8,300.00 8,300.00 604-31010 Manhole Box Base (10 Foot) 2 Each 16,800.00 8,400.00 604-31015 Manhole Box Base (15 Foot) 2 Each 17,000.00 8,500.00 604-39000 Manhole Special 29 Each 113,737.00 3,921.97 604-39015 Manhole Special (15 Foot) 2 Each 35,244.80 17,622.40 604-39020 Manhole Special (20 Foot) 1 Each 27,200.00 27,200.00 604-39025 Manhole Special (25 Foot) 1 Each 19,000.00 19,000.00 604-39050 Manhole (Traffic Management System) 26 Each 133,125.00 5,120.19 604-50003 Inlet Grating and Frame Type C 20 Each 9,051.92 452.60 605-00004 4 Inch Non-Perforated Pipe Underdrain 454 Lin Foot 5,902.00 13.00 605-00020 2 Inch Perforated Pipe Underdrain 990 Lin Foot 13,200.00 13.33 605-00040 4 Inch Perforated Pipe Underdrain 2,710 Lin Foot 26,206.60 9.67 605-00060 6 Inch Perforated Pipe Underdrain 3,069 Lin Foot 76,129.94 24.81 605-00080 8 Inch Perforated Pipe Underdrain 5,415 Lin Foot 259,920.00 48.00 605-00120 12 Inch Perforated Pipe Underdrain 534 Lin Foot 26,166.00 49.00 605-01030 3 Inch Horizontal Drain 1,500 Lin Foot 48,000.00 32.00 605-82100 Pipe Edge Drain 45,102 Lin Foot 479,255.85 10.63 605-82306 6 Inch Drain Pipe 60 Lin Foot 600.00 10.00 605-83002 Geocomposite Drain with Pipe 20 Sq Yard 670.00 33.50 605-83500 Geocomposite Underdrain 900 Lin Foot 6,039.00 6.71 605-83560 6 Inch Pipe Underdrain 456 Lin Foot 18,096.00 39.68 605-84000 Subsurface Drain Outlet 2,533 Lin Foot 27,894.65 11.01 605-85000 Surface Sand Filter 13,953 Sq Foot 78,834.45 5.65 606-00301 Guardrail Type 3 (6-3 Post Spacing) 175,049 Lin Foot 2,790,235.26 15.94 606-00305 Guardrail Type 3 (Special) 2,300 Lin Foot 46,000.00 20.00 606-00350 Guardrail Type 3 (Double) (6-3 Post Spacing) 19,820 Lin Foot 525,194.20 26.50 606-00601 Guardrail Type 6 (6-3 Post Spacing) 574 Lin Foot 9,585.80 16.70 606-00710 Guardrail Type 7 (Style CA) 29,639 Lin Foot 1,650,623.90 55.69 606-00715 Guardrail Type 7 (Style CA)(Concrete Glare Screen) 4,600 Lin Foot 299,000.00 65.00 606-00716 Guardrail Type 7 (Style CA) (Special) 1,550 Lin Foot 110,286.00 71.15 606-00720 Guardrail Type 7 (Style CC) 7,770 Lin Foot 371,721.30 47.84 606-00721 Guardrail Type 7 (Style CC) (Special) 2,618 Lin Foot 130,900.00 50.00 606-00725 Guardrail Type 7 (Style CC)(Concrete Glare Screen) 537 Lin Foot 112,665.00 209.80 606-00730 Guardrail Type 7 (Style CD) 3,013 Lin Foot 147,898.00 49.09 Colorado Department of Transportation 15:09 Thursday, February 19, 2009 19 2008 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/08 THROUGH 12/31/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 606-00740 Guardrail Type 7 (Style CE) 27,388 Lin Foot 1,696,830.00 61.96 606-00741 Guardrail Type 7 (Style CE) (Special) 1,511 Lin Foot 196,430.00 130.00 606-00755 Concrete Glare Screen (Precast Type 7) 8,305 Lin Foot 249,150.00 30.00 606-00900 Guardrail (Special) 226 Lin Foot 62,710.00 277.48 606-01320 End Anchorage Type 3B 7 Each 4,793.42 684.77 606-01340 End Anchorage Type 3D 145 Each 93,674.29 646.03 606-01370 Transition Type 3G 133 Each 164,361.40 1,235.80 606-01380 Transition Type 3H 47 Each 33,237.26 707.18 606-01385 Transition Type 3J 17 Each 11,835.04 696.18 606-01390 End Anchorage Type 3K 14 Each 15,575.00 1,112.50 606-01395 Transition Type 3L 35 Each 25,375.00 725.00 606-01460 Median Terminal 42 Each 166,372.59 3,961.25 606-02003 End Anchorage (Nonflared) 113 Each 213,567.76 1,889.98 606-02005 End Anchorage (Flared) 216 Each 386,744.99 1,790.49 606-10305 Bridge Rail Type 3 (Special) 158 Lin Foot 8,462.48 53.56 606-10700 Bridge Rail Type 7 4,639 Lin Foot 443,898.70 95.69 606-10705 Bridge Rail Type 7 (Special) 10,402 Lin Foot 756,777.44 72.75 606-10720 Bridge Rail Type 7 (Section A) 894 Lin Foot 59,540.40 66.60 606-11000 Bridge Rail Type 10 691 Lin Foot 92,255.41 133.51 606-11005 Bridge Rail Type 10 (Special) 491 Lin Foot 135,025.00 275.00 606-11010 Bridge Rail Type 10R 16,445 Lin Foot 1,776,023.58 108.00 606-11015 Bridge Rail Type 10R (Special) 1,025 Lin Foot 116,065.50 113.23 606-11020 Bridge Rail Type 10H 124 Lin Foot 12,621.96 101.79 606-11030 Bridge Rail Type 10M 3,412 Lin Foot 370,602.13 108.62 606-11032 Bridge Rail Type 10M (Special) 696 Lin Foot 111,360.00 160.00 606-20010 Tensioned Cable Barrier 37,415 Lin Foot 522,223.70 13.96 606-21010 End Anchorage (Tensioned Cable Barrier) 23 Each 69,630.00 3,027.39 607-00000 Line Post 5 Each 100.00 20.00 607-00005 End Post 309 Each 59,001.96 190.94 607-00010 Corner and Line Brace Post 496 Each 109,120.71 220.00 607-00015 End Post (Special) 75 Each 17,475.00 233.00 607-00020 Corner and Line Brace Post (Special) 116 Each 40,365.00 347.97 607-01000 Fence Barbed Wire with Metal Posts 230,908 Lin Foot 259,256.59 1.12 607-01100 Fence Barbed Wire With Treated Wooden Posts 19,068 Lin Foot 43,346.72 2.27 607-11200 Fence Combination Wire With Metal Posts 560 Lin Foot 912.80 1.63 607-11300 Fence Combination Wire With Treated Wooden Posts 2,971 Lin Foot 11,884.00 4.00 607-11350 Fence Deer 25,666 Lin Foot 234,929.90 9.15 607-11400 Fence Picket 620 Lin Foot 93,000.00 150.00 Colorado Department of Transportation 15:09 Thursday, February 19, 2009 20 2008 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/08 THROUGH 12/31/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 607-11525 Fence (Plastic) 50,924 Lin Foot 134,877.75 2.65 607-11530 Fence (Special) 1,312 Lin Foot 4,198.40 3.20 607-11575 Rock Fall Fence 100 Lin Foot 28,435.00 284.35 607-11576 Temporary Rockfall Containment System 1 Lump Sum 14,641.05 14,641.05 607-11580 Fence (Temporary) 8,877 Lin Foot 19,153.10 2.16 607-11581 Fence (Temporary) (Special) 121 Lin Foot 5,566.00 46.00 607-15000 Fence Concrete (Sound Barrier) 17,880 Sq Foot 768,840.00 43.00 607-21300 Fence Barrier With Metal Posts 200 Lin Foot 2,200.00 11.00 607-52900 Line Post (Chain Link) 143 Each 6,635.52 46.40 607-52905 End Post (Chain Link) 7 Each 2,224.39 317.77 607-52910 Corner and Line Brace Post (Chain Link) 9 Each 1,879.30 208.81 607-53137 Fence Chain Link (Special) (36 Inch) 6,344 Lin Foot 259,553.46 40.91 607-53148 Fence Chain Link (48 Inch) 25 Lin Foot 1,250.00 50.00 607-53172 Fence Chain Link (72 Inch) 1,525 Lin Foot 26,300.04 17.25 607-53173 Fence Chain Link (Special) (72 Inch) 1,440 Lin Foot 17,568.00 12.20 607-53220 Fence Chain Link (120 Inch) 615 Lin Foot 144,525.00 235.00 607-55030 Mesh Post 6 Each 22,776.00 3,796.00 607-55031 Mesh Post (Special) 2 Each 8,109.20 4,054.60 607-55040 Mesh Anchor 61 Each 20,213.48 331.37 607-55050 Mesh Anchor (Special) 39 Each 19,838.91 508.69 607-55100 Wire Mesh 131,274 Sq Foot 364,810.50 2.78 607-55101 Cable Net 24,300 Sq Foot 525,366.00 21.62 607-56001 Fence (Animal Protection) 784 Lin Foot 5,096.00 6.50 607-60000 Deer Gate 3 Each 5,400.00 1,800.00 607-60002 Game Ramp 12 Each 54,000.00 4,500.00 607-60006 6 Foot Gate Walk 1 Each 530.00 530.00 607-60112 12 Foot Gate 3 Each 1,708.26 569.42 607-60116 16 Foot Gate 19 Each 7,955.00 418.68 607-60117 16 Foot Gate (Special) 2 Each 530.00 265.00 607-60120 20 Foot Gate 4 Each 855.00 213.75 607-60218 18 Foot Gate Single (Chain Link) 7 Each 6,930.00 990.00 607-60274 24 Foot Gate Double (Chain Link) 3 Each 5,400.00 1,800.00 607-60316 16 Foot Gate Twin 1 Each 430.00 430.00 607-60600 Security Gate 1 Each 28,372.00 28,372.00 607-60620 Road Closure Gate 11 Each 109,136.92 9,921.54 607-60625 Road Closure Gate (Install Only) 1 Each 3,889.00 3,889.00 608-00000 Concrete Sidewalk 3,317 Sq Yard 140,304.73 42.30 608-00006 Concrete Sidewalk (6 Inch) 3,126 Sq Yard 126,830.52 40.57 Colorado Department of Transportation 15:09 Thursday, February 19, 2009 21 2008 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/08 THROUGH 12/31/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 608-00010 Concrete Curb Ramp 4,099 Sq Yard 391,328.28 95.47 608-00011 Curb Ramp (Fast Track) 42 Sq Yard 5,040.00 120.00 608-00012 Curb Ramp (Special) 69 Sq Yard 6,458.00 93.59 608-00015 Truncated Domes 1,738 Sq Foot 98,214.98 56.51 608-00100 Reinforced Grass/Concrete Porous Pavement 400 Sq Yard 26,400.00 66.00 608-00350 Concrete Sidewalk (Colored) 38 Sq Yard 2,774.00 73.00 608-01550 Place Asphalt Millings 14,263 Sq Yard 83,048.00 5.82 608-01600 Aggregate Walkway 320 Sq Yard 4,800.00 15.00 609-20010 Curb Type 2 (Section B) 624 Lin Foot 11,996.00 19.22 609-21010 Curb and Gutter Type 2 (Section I-B) 14,344 Lin Foot 177,365.90 12.37 609-21011 Curb and Gutter Type 2 (Section I-M) 9,073 Lin Foot 152,160.15 16.77 609-21020 Curb and Gutter Type 2 (Section II-B) 20,168 Lin Foot 360,459.51 17.87 609-21021 Curb and Gutter Type 2 (Section II-M) 11,434 Lin Foot 147,011.49 12.86 609-21023 Curb and Gutter Type 2 (Section II-B) (Special) 25 Lin Foot 948.25 37.93 609-22021 Curb, Gutter and Sidewalk Type 2 (Section MS) 237 Lin Foot 12,561.00 53.00 609-23000 Gutter (Special) 1,182 Lin Foot 38,769.60 32.80 609-24002 Gutter Type 2 (2 Foot) 691 Lin Foot 21,157.24 30.62 609-24003 Gutter Type 2 (3 Foot) 280 Lin Foot 9,240.00 33.00 609-24004 Gutter Type 2 (4 Foot) 953 Lin Foot 18,441.00 19.35 609-24008 Gutter Type 2 (8 Foot) 315 Lin Foot 11,497.50 36.50 609-31020 Curb and Gutter Type 2 (Section II-B) (Fast Track) 93 Lin Foot 1,873.95 20.15 609-40010 Curb Type 4 (Section B) 1,282 Lin Foot 9,539.60 7.44 609-40031 Curb Type 4 (Section B) (Key-Way) 3,784 Lin Foot 26,866.40 7.10 609-60011 Curb Type 6 (Section M) 43,948 Lin Foot 290,771.75 6.62 610-00010 Median Cover Material (Decorative) 823 Sq Foot 6,584.00 8.00 610-00020 Median Cover Material (Patterned Concrete) 29,996 Sq Foot 223,000.52 7.43 610-00024 Median Cover Material (4 Inch Patterned Concrete) 2,382 Sq Foot 22,864.79 9.60 610-00030 Median Cover Material (Concrete) 75,372 Sq Foot 336,188.00 4.46 610-00060 Median Cover Material (Brick Pavers) 1,426 Sq Foot 38,502.00 27.00 611-00013 12 Foot Deer Guard 2 Each 44,000.00 22,000.00 611-00019 18 Foot Deer Guard 3 Each 84,000.00 28,000.00 611-00025 24 Foot Deer Guard 1 Each 38,000.00 38,000.00 611-00027 26 Foot Deer Guard 1 Each 41,000.00 41,000.00 611-00031 30 Foot Deer Guard 1 Each 45,000.00 45,000.00 611-00032 32 Foot Cattle Guard 1 Each 7,500.00 7,500.00 611-00033 32 Foot Deer Guard 1 Each 48,000.00 48,000.00 611-00040 40 Foot Cattle Guard 1 Each 9,000.00 9,000.00 611-00047 46 Foot Deer Guard 1 Each 65,000.00 65,000.00 Colorado Department of Transportation 15:09 Thursday, February 19, 2009 22 2008 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/08 THROUGH 12/31/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 611-00057 56 Foot Deer Guard 1 Each 80,000.00 80,000.00 612-00001 Delineator (Type I) 8,346 Each 159,971.27 19.17 612-00002 Delineator (Type II) 2,646 Each 56,040.43 21.18 612-00003 Delineator (Type III) 1,395 Each 31,653.18 22.69 612-00021 Delineator (Type I) (Barrier) 2 Each 160.00 80.00 612-00022 Delineator (Type II) (Barrier) 326 Each 7,248.00 22.23 612-00031 Delineator (Type I) (Extra Height) 427 Each 14,777.00 34.61 612-00032 Delineator (Type II) (Extra Height) 92 Each 3,122.00 33.93 612-00033 Delineator (Type III) (Extra Height) 272 Each 43,363.00 159.42 612-00041 Delineator (Flexible) (Type I) 343 Each 14,588.70 42.53 612-00042 Delineator (Flexible) (Type II) 29 Each 1,078.20 37.18 612-00043 Delineator (Flexible) (Type III) 8 Each 366.00 45.75 612-00046 Delineator (Flexible) (Special) (Type I) 19 Each 1,852.88 97.52 612-00060 Reflector (Median Barrier) 50 Each 1,137.50 22.75 612-00075 Reflector Strip (6 Inch) 1,816 Each 43,950.00 24.20 612-00260 Location Marker (Fiber Optic)(Dome) 366 Each 61,457.00 167.92 612-00270 Location Marker (Utility)(Flat Slat) 120 Each 13,786.40 114.89 612-15000 Install Marker 100 Each 10,558.80 105.59 613-00001 Directional Boring Conduit 1,558 Lin Foot 34,776.00 22.32 613-00025 1-1/4 Inch HDPE Conduit 14,000 Lin Foot 70,000.00 5.00 613-00100 1 Inch Electrical Conduit 1,357 Lin Foot 13,989.42 10.31 613-00125 1-1/4 Inch Electrical Conduit 639 Lin Foot 6,390.00 10.00 613-00200 2 Inch Electrical Conduit 20,703 Lin Foot 309,775.75 14.96 613-00201 2 Inch Electrical Conduit (Jacked) 1,233 Lin Foot 16,058.80 13.02 613-00203 2 Inch Electrical Conduit (Multiduct)(Jacked) 1,041 Lin Foot 46,845.00 45.00 613-00206 2 Inch Electrical Conduit (Bored) 68,430 Lin Foot 753,540.30 11.01 613-00250 2-1/2 Inch Electrical Conduit 473 Lin Foot 13,717.00 29.00 613-00300 3 Inch Electrical Conduit 4,722 Lin Foot 71,048.00 15.05 613-00301 3 Inch Electrical Conduit (Jacked) 3,626 Lin Foot 97,494.90 26.89 613-00306 3 Inch Electrical Conduit (Bored) 5,440 Lin Foot 130,037.20 23.90 613-00402 4 Inch Electrical Conduit (Install Only) 1,428 Lin Foot 71,400.00 50.00 613-00406 4 Inch Electrical Conduit (Multiduct) (Jacked) 195 Lin Foot 3,900.00 20.00 613-00600 6 Inch Electrical Conduit 2,346 Lin Foot 54,704.50 23.32 613-00602 6 Inch Electrical Conduit (Install Only) 4,500 Lin Foot 22,500.00 5.00 613-00607 6 Inch Electrical Conduit (Bridge)(Special) 7,772 Lin Foot 466,320.00 60.00 613-01100 1 Inch Electrical Conduit (Plastic) 361 Lin Foot 3,068.50 8.50 613-01125 1-1/4 Inch Electrical Conduit (Plastic) 16,641 Lin Foot 99,846.00 6.00 613-01200 2 Inch Electrical Conduit (Plastic) 86,033 Lin Foot 845,457.64 9.83 Colorado Department of Transportation 15:09 Thursday, February 19, 2009 23 2008 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/08 THROUGH 12/31/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 613-01250 2-1/2 Inch Electrical Conduit (Plastic) 14,298 Lin Foot 200,172.00 14.00 613-01300 3 Inch Electrical Conduit (Plastic) 13,850 Lin Foot 143,356.48 10.35 613-01400 4 Inch Electrical Conduit (Plastic) 5,075 Lin Foot 61,475.00 12.11 613-03498 Electrical Conduit (Plastic)(Multiduct)(Special)(2) 18,773 Lin Foot 225,276.00 12.00 613-03499 Electrical Conduit (Plastic)(Multiduct)(Special)(Shar 24,574 Lin Foot 442,332.00 18.00 613-03500 Electrical Conduit (Plastic)(Multiduct)(Special) 55,182 Lin Foot 674,296.50 12.22 613-03501 HID Fixtures (Type M1 Tunnel Luminare) 30 Each 36,000.00 1,200.00 613-03503 HID Fixtures (Type M3 Tunnel Luminare) 226 Each 282,500.00 1,250.00 613-04000 Conduit (Install Only) 2,410 Lin Foot 9,640.00 4.00 613-04200 2 Inch Electrical Conduit (Liquidtight Flexible Metal 10 Lin Foot 900.00 90.00 613-07000 Pull Box (Special) 75 Each 85,595.70 1,141.28 613-07010 Pull Box (Surface Mounted) 18 Each 11,880.00 660.00 613-07017 Pull Box (16"x14"x6") 34 Each 31,169.28 916.74 613-07023 Pull Box (24"x36"x24") 46 Each 41,578.11 903.87 613-07026 Pull Box (16"x24"x12") 29 Each 10,520.00 362.76 613-07029 Pull Box (24"x24"x12") 2 Each 2,300.00 1,150.00 613-07032 Pull Box (24"x24"x24") 1 Each 625.00 625.00 613-07034 Pull Box (24"x36"x18") 184 Each 182,715.84 993.02 613-07038 Pull Box (36"x48"x18") 47 Each 52,736.78 1,122.06 613-07040 Pull Box (30"x48"x24") 24 Each 23,410.12 975.42 613-07050 Pull Box (13"x24"x18") Deep 10 Each 3,500.00 350.00 613-07060 Pull Box (18"x30"x18") Deep 32 Each 25,620.00 800.63 613-08000 Vault (Install Only) 2 Each 6,000.00 3,000.00 613-10000 Wiring 27 Lump Sum 499,770.28 18,510.01 613-10010 Wiring (Special) 3 Lump Sum 534,000.00 178,000.00 613-15750 HID Luminaire Mounting Support System 1 Lump Sum 175,000.00 175,000.00 613-16020 Luminaire (Special) Induction (165 Watt) 9 Each 11,034.72 1,226.08 613-32400 Light Standard Steel (40 Foot) 12 Each 37,200.00 3,100.00 613-34300 Light Standard Metal (30 Foot) 16 Each 76,325.00 4,770.31 613-34350 Light Standard Metal (35 Foot) 73 Each 140,650.00 1,926.71 613-34352 Light Standard Metal (35 Foot) (Special) (2 Arm) 114 Each 627,000.00 5,500.00 613-34400 Light Standard Metal (40 Foot) 15 Each 64,575.04 4,305.00 613-34502 Light Standard Metal (50 Foot) (2 Arm) 7 Each 42,700.00 6,100.00 613-40000 Concrete Foundation Pad 13 Each 10,400.00 800.00 613-40010 Light Standard Foundation 113 Each 94,834.71 839.25 613-40012 Light Standard Foundation Special 11 Each 28,050.00 2,550.00 613-50100 Lighting Control Center 21 Each 129,175.00 6,151.19 613-50375 Solar Collection System 2 Each 54,860.00 27,430.00 Colorado Department of Transportation 15:09 Thursday, February 19, 2009 24 2008 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/08 THROUGH 12/31/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 613-50410 Light Standard (Temporary) 9 Each 98,634.51 10,959.39 613-70150 Luminaire High Pressure Sodium (150 Watt) 8 Each 8,000.00 1,000.00 613-70250 Luminaire High Pressure Sodium (250 Watt) 26 Each 12,699.50 488.44 613-70400 Luminaire High Pressure Sodium (400 Watt) 99 Each 46,610.00 470.81 613-73500 Luminaire Metal Halide (250 Watt) 12 Each 4,500.00 375.00 613-75150 Luminaire Metal Halide (150 Watt) 253 Each 297,350.00 1,175.30 613-75250 Luminaire Metal Halide (250 Watt) 32 Each 26,560.00 830.00 613-81900 Mobile Light Tower 2 Each 16,000.00 8,000.00 614-00011 Sign Panel (Class I) 5,969 Sq Foot 103,212.36 17.29 614-00012 Sign Panel (Class II) 7,486 Sq Foot 151,196.16 20.20 614-00013 Sign Panel (Class III) 4,624 Sq Foot 111,027.08 24.01 614-00035 Sign Panel (Special) 488 Sq Foot 14,462.26 29.64 614-00040 Sign Post (Special) 612 Lin Foot 5,508.00 9.00 614-00044 Timber Sign Post 4x4 Inch 324 Lin Foot 3,142.80 9.70 614-00200 Steel Sign Post (U-2) 270 Lin Foot 1,584.00 5.87 614-00214 Steel Sign Post (1.75x1.75 Inch Tubing) 29 Lin Foot 493.00 17.00 614-00216 Steel Sign Post (2x2 Inch Tubing) 311 Lin Foot 1,866.00 6.00 614-00220 Steel Sign Post (2.5x2.5 Inch Tubing) 1,588 Lin Foot 30,172.00 19.00 614-00612 Steel Sign Post (W 6x12) 87 Lin Foot 5,469.00 62.86 614-00615 Steel Sign Post (W 6x15) 162 Lin Foot 7,245.20 44.72 614-00818 Steel Sign Post (W 8x18) 68 Lin Foot 3,217.50 47.32 614-00821 Steel Sign Post (W 8x21) 52 Lin Foot 3,952.00 76.00 614-01022 Steel Sign Post (W 10x22) 85 Lin Foot 4,117.27 48.44 614-01026 Steel Sign Post (W 10x26) 160 Lin Foot 9,440.00 59.00 614-01226 Steel Sign Post (W 12x26) 100 Lin Foot 6,800.00 68.00 614-01502 Steel Sign Support (2-Inch Round)(Post & Socket) 735 Lin Foot 15,505.82 21.10 614-01503 Steel Sign Support (2-Inch Round)(Post and Socket) 188 Each 12,947.82 68.87 614-01512 Steel Sign Support (2-Inch Round)(Post) 932 Lin Foot 10,504.88 11.27 614-01522 Steel Sign Support (2-Inch Round)(Socket) 218 Each 14,217.45 65.22 614-01554 Steel Sign Post (4 Inch Round) (Slipbase) 63 Lin Foot 2,331.00 37.00 614-01572 Steel Sign Support (2-1/2 Inch Round NP-40)(Post & Sl 285 Lin Foot 9,361.50 32.85 614-01573 Steel Sign Support (2-1/2 Inch Round NP-40)(Post & Sl 134 Each 45,401.70 338.82 614-01575 Steel Sign Support (2-1/2 Inch Round NP-40)(Post) 1,092 Lin Foot 27,390.98 25.08 614-01578 Steel Sign Support (2-1/2 Inch Round NP-40)(Slipbase) 99 Each 23,854.04 240.95 614-01582 Steel Sign Support (2-1/2 Inch Round)(Post and Slipba 2,358 Lin Foot 97,845.70 41.50 614-01583 Steel Sign Support (2-1/2 Inch Round)(Post & Slipbase 117 Each 30,035.68 256.72 614-01585 Steel Sign Support (2-1/2 Inch Round Sch 80)(Post) 1,617 Lin Foot 42,894.32 26.53 614-01588 Steel Sign Support (2-1/2 Inch Round Sch 80)(Slipbase 205 Each 44,965.35 219.34 Colorado Department of Transportation 15:09 Thursday, February 19, 2009 25 2008 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/08 THROUGH 12/31/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 614-03001 Concrete Footing (Type 1) 10 Each 13,534.00 1,353.40 614-03002 Concrete Footing (Type 2) 10 Each 14,942.00 1,494.20 614-03003 Concrete Footing (Type 3) 6 Each 9,137.24 1,522.87 614-03004 Concrete Footing (Type 4) 10 Each 18,521.00 1,852.10 614-03005 Concrete Footing (Type 5) 6 Each 11,132.88 1,855.48 614-03006 Concrete Footing (Type 6) 6 Each 11,400.00 1,900.00 614-03007 Concrete Footing (Type 7) 4 Each 8,400.00 2,100.00 614-07000 Mask Sign Legend 33 Each 3,038.31 92.07 614-07105 Modification of Sign Legend 15 Each 2,951.85 196.79 614-10120 Variable Message Sign 1 Each 127,368.42 127,368.42 614-10125 Variable Message Sign (Ground Mounted) 1 Each 104,000.00 104,000.00 614-10128 Blankout Sign (Fiber Optic) 4 Each 43,400.00 10,850.00 614-10145 Variable Message Sign LED (Single Faced) 2 Each 27,520.00 13,760.00 614-10151 12 Inch LED (Ball) (Green) 15 Each 2,400.00 160.00 614-10152 12 Inch LED (Ball) (Red) 15 Each 1,605.00 107.00 614-10153 12 Inch LED (Ball) (Yellow) 15 Each 1,605.00 107.00 614-10156 12 Inch LED (Arrow) (Green) 4 Each 600.00 150.00 614-10158 12 Inch LED (Arrow) (Yellow) 4 Each 492.00 123.00 614-10160 Signal Head Backplates 48 Each 13,650.00 284.38 614-10320 System Intergration and Testing 1 Lump Sum 78,618.00 78,618.00 614-30110 Butterfly Structure 2 Each 60,000.00 30,000.00 614-30205 VMS Butterfly Support (Roadside) 1 Each 30,000.00 30,000.00 614-31800 Monotube Overhead Sign Cantilever (18 Inch Diameter) 1 Each 29,080.00 29,080.00 614-32400 Monotube Overhead Sign Cantilever (24 Inch Diameter) 8 Each 284,213.42 35,526.68 614-42400 Monotube Overhead Sign Bridge (24 Inch Diameter) 2 Each 108,000.00 54,000.00 614-70116 Pedestrian Signal Face (16-16) 2 Each 900.00 450.00 614-70117 Pedestrian Signal Face (16) 49 Each 26,667.00 544.22 614-70118 Pedestrian Signal Face (18) 4 Each 2,473.76 618.44 614-70150 Pedestrian Signal Face (16) (Countdown) 40 Each 31,271.24 781.78 614-70216 Traffic Signal Face (8-8) 8 Each 4,546.24 568.28 614-70328 Traffic Signal Face (12-8-8) 8 Each 5,327.36 665.92 614-70336 Traffic Signal Face (12-12-12) 343 Each 266,500.84 776.97 614-70337 Traffic Signal Face (12-12-12) (Install Only) 10 Each 2,300.00 230.00 614-70448 Traffic Signal Face (12-12-12-12) 2 Each 2,420.00 1,210.00 614-70450 Traffic Signal Face (12-12-12-12)(Install Only) 4 Each 1,400.00 350.00 614-70560 Traffic Signal Face (12-12-12-12-12) 62 Each 78,529.60 1,266.61 614-72740 Blank Out Sign(LED)(Single Faced) 2 Each 16,256.74 8,128.37 614-72830 Communications Cabinet 6 Each 40,612.00 6,768.67 Colorado Department of Transportation 15:09 Thursday, February 19, 2009 26 2008 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/08 THROUGH 12/31/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 614-72855 Traffic Signal Controller Cabinet 2 Each 22,418.00 11,209.00 614-72857 Surface Mounted Control Cabinet 1 Each 2,700.00 2,700.00 614-72858 Pedestal Pole (3 Foot 6 Inch) 5 Each 5,520.32 1,104.06 614-72860 Pedestrian Push Button 54 Each 11,065.72 204.92 614-72861 Pedestrian Push Button (Install Only) 8 Each 632.00 79.00 614-72866 Fire Preemption Unit and Timer 12 Each 41,905.10 3,492.09 614-72871 Loop Detector Wire (Prefab) Special 19,261 Lin Foot 232,003.50 12.05 614-72872 Loop Detector (Micro Type) 17 Each 24,225.00 1,425.00 614-72875 Loop Detector Wire 37,645 Lin Foot 112,514.05 2.99 614-72876 Traffic Signal Vehicle Detector Amplifier (Loop Type) 12 Each 3,250.00 270.83 614-72878 Traffic Signal Vehicle Detector Amplifier (Loop Type) 22 Each 16,018.08 728.09 614-72882 Traffic Signal Vehicle Detector (Micro Type) 8 Each 6,400.00 800.00 614-72886 Intersection Detection System (Camera) 33 Each 201,233.04 6,097.97 614-72887 Microwave Vehicle Radar Detector 17 Each 197,550.57 11,620.62 614-72889 Traffic Signal Vehicle Detector (Micro Type) (Non-Inv 22 Each 27,311.20 1,241.42 614-72890 Span Wire Cable 860 Lin Foot 4,322.85 5.03 614-72893 Signal Cable 300 Lin Foot 2,700.00 9.00 614-72896 Intersection Detection System (Camera)(Install Only) 16 Each 16,960.00 1,060.00 614-73005 Piezo Electric Tube, Class 2 23 Each 48,885.00 2,125.43 614-75216 Pedestrian Signal Face (16) (Install Only) 8 Each 1,600.00 200.00 614-75848 Traffic Signal Controller and Cabinet (Install Only) 2 Each 14,390.00 7,195.00 614-75855 Traffic Signal Controller Cabinet (Install Only) 5 Each 5,340.00 1,068.00 614-75866 Fire Preemption Unit and Timer (Install Only) 2 Each 1,320.00 660.00 614-80000 Flashing Beacon 20 Each 41,677.50 2,083.88 614-80001 Flashing Beacon (Solar Powered) 15 Each 8,340.00 556.00 614-80312 Barricade (Type 3 F-B) 2 Each 2,256.86 1,128.43 614-80314 Barricade (Type 3 F-D) 1 Each 2,191.88 2,191.88 614-80355 Portable Message Sign Panel 1 Each 16,578.95 16,578.95 614-80385 Rumble Strip 1,221,271 Lin Foot 208,615.40 0.17 614-80386 Rumble Strip (Special) 40,510 Lin Foot 2,025.50 0.05 614-80387 Rumble Strip (Grinding) 214,935 Lin Foot 47,303.18 0.22 614-80391 Rumble Strip (Grinding)(Asphalt) 75,972 Lin Foot 16,973.74 0.22 614-81010 Traffic Signal-Light Pole Steel (1 Mast Arm) 1 Each 21,000.00 21,000.00 614-81011 Traffic Signal-Light Pole Steel (1 Mast Arm) (Install 7 Each 23,200.00 3,314.29 614-81020 Traffic Signal-Light Pole Steel (2 Mast Arm) 4 Each 108,140.00 27,035.00 614-81115 Traffic Signal Light Pole Steel (1-15 Foot Mast Arm) 1 Each 15,500.00 15,500.00 614-81125 Traffic Signal-Light Pole Steel (1-25 Foot Mast Arm) 2 Each 17,312.00 8,656.00 614-81130 Traffic Signal-Light Pole Steel (1-30 Foot Mast Arm) 1 Each 15,414.00 15,414.00 Colorado Department of Transportation 15:09 Thursday, February 19, 2009 27 2008 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/08 THROUGH 12/31/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 614-81135 Traffic Signal-Light Pole Steel (1-35 Foot Mast Arm) 2 Each 28,910.00 14,455.00 614-81140 Traffic Signal-Light Pole Steel (1-40 Foot Mast Arm) 7 Each 105,564.66 15,080.67 614-81145 Traffic Signal-Light Pole Steel (1-45 Foot Mast Arm) 5 Each 91,225.00 18,245.00 614-81150 Traffic Signal-Light Pole Steel (1-50 Foot Mast Arm) 10 Each 173,082.00 17,308.20 614-81155 Traffic Signal-Light Pole Steel (1-55 Foot Mast Arm) 6 Each 97,282.00 16,213.67 614-81160 Traffic Signal Light Pole Steel (1-60 Mast Arm Foot) 2 Each 41,078.00 20,539.00 614-81165 Traffic Signal-Light Pole Steel (1-65 Foot Mast Arm) 7 Each 166,454.20 23,779.17 614-81170 Traffic Signal-Light Pole Steel (1-70 Foot Mast Arm) 3 Each 85,400.00 28,466.67 614-81175 Traffic Signal-Light Pole Steel (1-75 Foot Mast Arm) 8 Each 259,996.63 32,499.58 614-81250 Traffic Signal-Light Pole Steel (2-50 Foot Mast Arm) 1 Each 29,677.00 29,677.00 614-81255 Traffic Signal Light Pole Steel (2-55 Foot Mast Arm) 1 Each 34,000.00 34,000.00 614-81300 Traffic Signal-Light Pole (Install Only) 3 Each 11,100.00 3,700.00 614-84000 Traffic Signal Pedestal Pole Steel 12 Each 15,692.00 1,307.67 614-84100 Traffic Signal Pedestal Pole Aluminum 8 Each 7,184.00 898.00 614-85001 Impact Attenuator 21 Each 484,200.00 23,057.14 614-85312 Traffic Signal Span Wire Pole (12 Inch) 1 Each 7,650.00 7,650.00 614-85362 Traffic Signal-Light Span Wire Pole (12 Inch) 4 Each 38,000.00 9,500.00 614-85366 Traffic Signal-Light Span Wire Pole (16 Inch) 4 Each 26,400.00 6,600.00 614-86002 Spread Spectrum Radio 1 Each 2,800.00 2,800.00 614-86006 Telemetry (Master) 8 Each 44,000.00 5,500.00 614-86007 Serial to IP Converter 12 Each 33,666.00 2,805.50 614-86101 Wireless Mesh Router 18 Each 108,090.00 6,005.00 614-86102 Wireless Device Router 13 Each 70,850.00 5,450.00 614-86103 Wireless Router Controller 1 Each 18,110.00 18,110.00 614-86105 Telemetry (Field) 8 Each 25,208.56 3,151.07 614-86106 Telemetry (Field)(Install Only) 9 Each 9,710.00 1,078.89 614-86240 Traffic Signal Controller (Type 170) 3 Each 41,900.00 13,966.67 614-86245 Controller (Type 170E) 11 Each 118,678.60 10,788.96 614-86246 Controller (Type 170E-HC11) 6 Each 112,391.00 18,731.83 614-86710 Traffic Signal Equipment 1 Lump Sum 11,200.00 11,200.00 614-86735 Weather Sensor 2 Lump Sum 50,000.00 25,000.00 614-86755 Deicing System 1 Lump Sum 175,000.00 175,000.00 614-86800 Uninterrupted Power Supply 10 Each 72,533.15 7,253.32 614-87010 Fiber Optic Cable (Single Mode) (12 Fiber) 2,600 Lin Foot 14,179.50 5.45 614-87011 Fiber Optic Cable (Single Mode) (24 Fiber) 4,263 Lin Foot 6,948.69 1.63 614-87012 Fiber Optic Termination Panel - 12 Fiber 8 Each 4,400.00 550.00 614-87015 Buffer Tube Fan Out Kit 10 Each 6,104.80 610.48 614-87020 Optical Transceiver 16 Each 31,017.50 1,938.59 Colorado Department of Transportation 15:09 Thursday, February 19, 2009 28 2008 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/08 THROUGH 12/31/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 614-87025 Optical Transceiver Chassis 4 Each 6,000.00 1,500.00 614-87040 Cable Innerduct (1 Inch) 5,000 Lin Foot 25,000.00 5.00 614-87100 Automatic Traffic Recording Station 1 Each 16,500.00 16,500.00 614-87144 Fiber Optic Termination Panel-144 Fiber 4 Each 15,400.00 3,850.00 614-87310 Traffic Management System Building Equipment 1 Lump Sum 100,000.00 100,000.00 614-87321 Closed Circuit Television (Install Only) 2 Each 3,130.00 1,565.00 614-87325 Closed Circuit Television Pole 3 Each 15,420.00 5,140.00 614-87350 Test Fiber Optic Cable 6 Lump Sum 30,763.04 5,127.17 614-87406 Fiber Optic Cable (Single Mode) (6 Strands) 16,505 Lin Foot 30,389.00 1.84 614-87496 Fiber Optic Cable (Single Mode) (96 Strands) 11,566 Lin Foot 37,907.20 3.28 614-87498 Fiber Optic Cable (Single Mode) (144 Strands) 330,996 Lin Foot 506,651.60 1.53 614-87499 Fibert Optic Cable (Single Mode) (Install Only) 6,500 Lin Foot 13,000.00 2.00 614-87506 Splice Fiber Optic Cable (6 Strand) 25 Each 16,360.00 654.40 614-87606 Terminate Fiber Optic Cable (6 Strand) 6 Each 4,350.00 725.00 614-87660 Video Enc/Dec 5 Each 24,875.00 4,975.00 614-87690 Ethernet Switch 2 Each 156,000.00 78,000.00 615-00030 Embankment Protector Type 3 32 Each 50,328.24 1,572.76 615-00050 Embankment Protector Type 5 43 Each 109,152.48 2,538.43 616-00240 24 Inch Concrete Siphon Pipe 170 Lin Foot 11,730.00 69.00 616-00360 36 Inch Concrete Siphon Pipe 328 Lin Foot 31,160.00 95.00 616-30024 24 Inch Trash Guard 3 Each 1,680.00 560.00 616-30036 36 Inch Trash Guard 4 Each 3,550.00 887.50 616-30499 Trash Guard Special 3 Each 2,552.25 850.75 616-50048 6 Inch Valve and Valve Box 3 Each 2,550.00 850.00 617-00012 12 Inch Culvert Pipe 40 Lin Foot 1,000.00 25.00 617-03000 Detour Culvert Pipe 1 Lump Sum 21,000.00 21,000.00 617-03010 Detour Culvert Pipe 2,852 Lin Foot 85,380.80 29.94 618-00002 Prestressing Steel Wire or Strand 1,186 M Kip Foot 139,948.00 118.00 618-00142 Prestressed Concrete I (BT42) 2,092 Lin Foot 414,020.00 197.91 618-00154 Prestressed Concrete I (BT54) 5,638 Lin Foot 1,085,264.12 192.49 618-00163 Prestressed Concrete I (BT63) 5,969 Lin Foot 989,285.00 165.74 618-00172 Prestressed Concrete I (BT72) 6,458 Lin Foot 1,238,560.00 191.79 618-01994 Prestressed Concrete Box (Depth 32" Through 48") 14,618 Sq Foot 916,813.74 62.72 618-06036 Prestressed Concrete Slab (Depth Greater Than 13 Inch 2,476 Sq Foot 118,848.00 48.00 618-08900 Ground Anchor 26,650 Lin Foot 1,359,150.00 51.00 619-00010 Water Line (Special) 1 Lump Sum 764,800.00 764,800.00 619-06060 6 Inch Ductile Iron Pipe 98 Lin Foot 4,900.00 50.00 619-73016 2 Inch Blow Off 2 Each 3,800.00 1,900.00 Colorado Department of Transportation 15:09 Thursday, February 19, 2009 29 2008 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/08 THROUGH 12/31/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 619-75048 6 Inch Gate Valve 1 Each 700.00 700.00 619-75096 12 Inch Gate Valve 6 Each 15,000.00 2,500.00 620-00001 Field Office (Class 1) 9 Each 119,709.58 13,301.06 620-00002 Field Office (Class 2) 59 Each 971,188.86 16,460.83 620-00005 Field Office (Special) 4 Each 385,700.00 96,425.00 620-00011 Field Laboratory (Class 1) 9 Each 107,590.15 11,954.46 620-00012 Field Laboratory (Class 2) 64 Each 1,065,092.41 16,642.07 620-00020 Sanitary Facility 137 Each 225,973.62 1,649.44 621-00425 Detour 2 Lump Sum 221,377.99 110,689.00 621-00450 Detour Pavement 62,724 Sq Yard 2,144,329.96 34.19 621-00650 Pedestrian Stair Structure 1 Lump Sum 6,900.00 6,900.00 621-00700 Pedestrian Pathway 1 Lump Sum 31,900.00 31,900.00 622-00270 Bollard 12 Each 16,520.00 1,376.67 622-11010 Maintenance Building 1 Lump Sum 40,000.00 40,000.00 622-11160 Erect Building 1 Lump Sum 47,300.00 47,300.00 623-09900 Sprinkler System 1 Lump Sum 5,637.50 5,637.50 624-14024 24 Inch Culvert Pipe (CR 4) 624 Lin Foot 38,829.90 62.23 625-00000 Construction Surveying 71 Lump Sum 2,357,271.71 33,201.01 625-00001 Construction Surveying (Hourly) 773 Hour 106,880.71 138.27 626-00000 Mobilization 119 Lump Sum 30,735,721.42 258,283.37 626-00100 Mobilization (without Autopay) 1 Lump Sum 49,600.00 49,600.00 626-01000 Public Information Services 65 Lump Sum 522,112.30 8,032.50 627-00001 Pavement Marking Paint 27,451 Gallon 875,632.82 31.90 627-00003 Thermoplastic Pavement Marking (Inlaid) 2,729 Sq Foot 33,949.00 12.44 627-00004 Epoxy Pavement Marking 333 Sq Foot 13,320.00 40.00 627-00005 Epoxy Pavement Marking 30,933 Gallon 2,369,600.99 76.60 627-00011 Pavement Marking Paint (Waterborne) 14,108 Gallon 433,428.61 30.72 627-00012 Pavement Marking Paint (Low VOC Solvent Base) 19,189 Gallon 564,506.00 29.42 627-00025 4 Inch Pavement Marking Tape (Removable) 16,120 Lin Foot 35,655.00 2.21 627-00030 Raised Pavement Marker (Temporary) 11,573 Each 25,729.00 2.22 627-00070 Preformed Thermoplastic Pavement Marking 7,983 Sq Foot 50,292.90 6.30 627-01001 Preformed Plastic Pavement Marking (Type I) 42,422 Sq Foot 417,980.80 9.85 627-01010 Preformed Plastic Pavement Marking (Type I)(Inlaid) 93,662 Sq Foot 900,549.00 9.61 627-02001 Preformed Plastic Pavement Marking (Type II) 59,413 Sq Foot 493,933.92 8.31 627-02010 Preformed Plastic Pavement Marking (Type II) (Inlaid) 27,357 Sq Foot 265,022.57 9.69 627-02050 Research Project Pavement Marking 1 Lump Sum 19,487.88 19,487.88 627-03001 Preformed Plastic Pavement Marking (Type III) 1,370 Sq Foot 10,069.50 7.35 627-03003 Preformed Plastic Pavement Marking (Type C) (Inlaid) 160 Sq Foot 3,200.00 20.00 Colorado Department of Transportation 15:09 Thursday, February 19, 2009 30 2008 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/08 THROUGH 12/31/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 627-03010 Preformed Plastic Pavement Marking (Type III) (Inlaid 333 Sq Foot 9,990.00 30.00 627-30205 Thermoplastic Pavement Marking (Word-Symbol) 3,041 Sq Foot 39,061.68 12.85 627-30210 Thermoplastic Pavement Marking (Xwalk-Stopline) 9,800 Sq Foot 81,277.36 8.29 627-30305 Preformed Plastic Pavement Marking (60 Mil) (Word-Sym 176 Sq Foot 2,640.00 15.00 627-30324 Preformed Plastic Pavement Marking (Word-Symbol) (Typ 5,895 Sq Foot 98,510.55 16.71 627-30327 Preformed Plastic Pavement Marking (Word-Symbol) (Typ 3,243 Sq Foot 54,499.09 16.81 627-30329 Preformed Plastic Pavement Marking (Xwalk-Stop Line) 9,783 Sq Foot 122,733.30 12.55 627-30331 Preformed Plastic Pavement Marking (Xwalk - Stop Line 2,082 Sq Foot 21,861.00 10.50 627-30332 Preformed Plastic Pavement Marking (Xwalk-Stop Line) 13,262 Sq Foot 110,379.90 8.32 627-30405 Preformed Thermoplastic Pavement Marking (Word-Symbol 11,748 Sq Foot 153,150.85 13.04 627-30410 Preformed Thermoplastic Pavement Marking (Xwalk-Stop 60,190 Sq Foot 583,724.29 9.70 629-01001 Survey Monument (Type 1) 11 Each 3,084.44 280.40 629-01002 Survey Monument (Type 2) 11 Each 3,530.24 320.93 629-01005 Survey Monument (Type 5) 1 Each 200.00 200.00 629-01011 Survey Monument (Type 1A) 1 Each 845.14 845.14 629-01031 Survey Monument (Type 3A) 18 Each 7,798.40 433.24 629-01110 Locate Monuments 48 Hour 6,269.60 130.62 629-01210 Adjust Monument Box 7 Each 3,640.18 520.03 630-00000 Flagging 278,188 Hour 6,424,634.20 23.09 630-00001 Pilot Car Operation 10,000 Hour 362,501.50 36.25 630-00003 Uniformed Traffic Control 10,527 Hour 816,779.82 77.59 630-00004 Traffic Control Vehicle 10 Each 30,162.97 3,016.30 630-00007 Traffic Control Inspection 4,406 Day 609,210.35 138.27 630-00012 Traffic Control Management 9,877 Day 5,701,695.58 577.27 630-00015 Uniformed Traffic Control Coordination 2,903 Hour 88,082.86 30.34 630-00020 Traffic Control Vehicle 1,192 Day 53,480.84 44.87 630-00025 Traffic Control Vehicle 81 Hour 1,172.00 14.47 630-80001 Flashing Beacon (Portable) 123 Each 110,057.80 894.78 630-80002 Flashing Beacon (Solar) 72 Each 62,066.88 862.04 630-80305 Flagging Station Light 6 Each 3,700.00 616.67 630-80335 Barricade (Type 3 M-A) (Temporary) 201 Each 38,788.34 192.98 630-80336 Barricade (Type 3 M-B) (Temporary) 137 Each 34,821.38 254.17 630-80337 Barricade (Type 3 M-C) (Temporary) 4 Each 800.00 200.00 630-80338 Barricade (Type 3 M-D) (Temporary) 100 Each 34,975.90 349.76 630-80341 Construction Traffic Sign (Panel Size A) 4,269 Each 271,997.41 63.71 630-80342 Construction Traffic Sign (Panel Size B) 6,362 Each 480,791.59 75.57 630-80343 Construction Traffic Sign (Panel Size C) 1,275 Each 115,885.42 90.89 630-80344 Construction Traffic Sign (Special) 9,698 Sq Foot 150,954.14 15.57 Colorado Department of Transportation 15:09 Thursday, February 19, 2009 31 2008 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/08 THROUGH 12/31/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 630-80348 Construction Information Sign 18 Each 2,292.05 127.34 630-80350 Vertical Panel 562 Each 11,016.50 19.60 630-80355 Portable Message Sign Panel 206 Each 1,219,612.44 5,920.45 630-80356 Advance Warning Flashing or Sequencing Arrow Panel (A 2 Each 600.00 300.00 630-80357 Advance Warning Flashing or Sequencing Arrow Panel (B 9 Each 6,128.00 680.89 630-80358 Advance Warning Flashing or Sequencing Arrow Panel (C 175 Each 251,112.31 1,434.93 630-80359 Portable Message Sign Panel 2,366 Day 211,765.72 89.50 630-80360 Drum Channelizing Device 12,579 Each 437,627.36 34.79 630-80363 Drum Channelizing Device (With Light) (Flashing) 817 Each 39,818.91 48.74 630-80364 Drum Channelizing Device (With Light) (Steady Burn) 934 Each 49,965.76 53.50 630-80365 Portable Message Sign Panel (State Furnished) 2 Each 1,000.00 500.00 630-80367 Portable Traffic Speed Monitor 9 Each 58,994.08 6,554.90 630-80370 Concrete Barrier (Temporary) 77,442 Lin Foot 2,202,965.48 28.45 630-80375 Concrete Barrier (Temporary) (Install Only) 180 Lin Foot 16,200.00 90.00 630-80376 Guardrail Type 7 (Temporary) 3,838 Lin Foot 200,876.50 52.34 630-80378 Glare Screen (Temporary) 1,700 Lin Foot 23,185.00 13.64 630-80380 Traffic Cone 32,530 Each 307,397.00 9.45 630-80384 Tubular Marker 470 Each 11,080.00 23.57 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 1 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 201-00000 Clear and Grub LUMP SUM =============================================== HB131A-033 SH 131 ROUTT COUNTY 01/10/08 1.00 35000.00 103910.00 75000.00 STA 0831-099 SH 83 AT RUSSELLVILLE ROAD SO 01/17/08 1.00 11000.00 6512.09 800.00 HB 0131-050 SH 13 NORTH OF RIFLE 02/07/08 1.00 20000.00 59166.67 10000.00 SHE0741-016 THE INTERSECTION OF SH 74 AND 02/14/08 1.00 11500.00 4300.00 4000.00 HB0132-017 SH13 WY STATE LINE SOUTH OVER 03/13/08 1.00 7500.00 60611.58 11000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 17000.00 43727.21 20160.00 C 1191-023 FROM MP 0.0 TO MP 2.6 GILPIN 04/03/08 1.00 35000.00 48257.14 15000.00 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 1.00 140000.00 141448.77 101000.00 NH5501-013 US 550 N OF NM STATE LINE, MP 04/10/08 1.00 30000.00 39659.85 25000.00 SHE 0501-056 US 50 AND 28.5 RD IN GRAND JU 04/10/08 1.00 10000.00 6481.67 10000.00 IM 0705-077 I70 WEST OF BURLINGTON EAST I 04/17/08 1.00 95000.00 79472.95 139564.74 NH0504-056 US 50 PASSING LANES EAST OF 5 05/15/08 1.00 35000.00 55087.29 61111.00 C 1601-060 US 160 MONTEZUMA COUNTY 06/26/08 1.00 8000.00 10300.00 8000.00 STA086A-048 INTERSECTION OF SH 86 & COUNT 06/26/08 1.00 5000.00 4413.75 1100.00 STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 1.00 125000.00 92722.34 82386.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 9.00 53666.67 64634.09 49240.19 SHE0831-102 PARKER RD: LONG AVE INTERSECT 07/24/08 1.00 2000.00 4600.16 2000.00 NH 2854-109 US 285: DEER CREEK INTERCHANG 07/31/08 1.00 55000.00 72175.00 50000.00 STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 1.00 35000.00 22087.93 22700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 30666.67 33925.91 24900.00 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 1.00 120000.00 83189.78 37200.00 BR 0361-088 US36 AND CHERRYVALE RD 10/16/08 1.00 15000.00 15112.71 12000.00 SHE 0821-082 SH 82/SMITH WAY - PITKIN 10/16/08 1.00 3000.00 39250.00 60000.00 NH 1602-117 THIS PROJECT IS LOCATED ABOUT 12/04/08 1.00 75000.00 179442.21 235000.00 SHE 0451-009 SH45 (PUEBLO BLVD) AND RED CR 12/04/08 1.00 2000.00 6272.40 3440.00 C1601-057 ON U.S. 160, APPROXIMATELY M. 12/04/08 1.00 9000.00 56966.67 34800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 37333.33 61319.12 63740.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 23.00 38434.78 55329.75 43526.16 =============== 201-00001 Clear and Grub Acre =================================================== STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 48.00 2000.00 2178.88 2600.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 2 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 201-00001 Clear and Grub Acre =================================================== STU 0251-329 S OF COLORADO CITY TO CEDARWO 03/06/08 47.00 500.00 163.39 66.95 SHE0702-276 EAGLE COUNTY I-70 MP 171 TO M 03/13/08 1.43 3000.00 40333.33 110000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 96.43 1283.73 1460.20 2958.07 C 067A-026 SH67 AND CR81 04/10/08 3.00 2000.00 4166.67 5000.00 NH 0503-064 US 50:15TH AND 16TH ST IN CAN 04/17/08 0.20 5000.00 18494.29 6000.00 STS 1151-021 SH 115 AT CR F45 IN FREMONT C 05/15/08 0.70 3000.00 6928.13 5000.00 STA 069A-023 SH 69 WESTCLIFFE AREA - CUSTE 06/26/08 4.00 3000.00 4857.06 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7.90 2670.89 4986.86 3759.49 C0702-284 I-70 TRUCK PARKING AT DOTSERO 09/11/08 7.30 2000.00 2845.00 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7.30 2000.00 2845.00 500.00 NH1601-058 ON US 160, FROM M.P. 21.40 TO 10/09/08 10.00 500.00 2384.40 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 500.00 2384.40 3000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 121.63 1352.38 1881.56 2866.04 =============== 201-00005 Rem of Debris LUMP SUM =============================================== NHC040-027 POWERS BLVD - FROM WOODMEN RO 08/21/08 1.00 1000.00 8884.49 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1000.00 8884.49 1500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1000.00 8884.49 1500.00 =============== 202-00000 Rem Str and Obstructions LUMP SUM =============================================== C 0702-274 FRISCO (MM 201) TO EAST VAIL 03/06/08 1.00 14000.00 12179.97 6853.92 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 14000.00 12179.97 6853.92 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 3 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00000 Rem Str and Obstructions LUMP SUM =============================================== NH5501-013 US 550 N OF NM STATE LINE, MP 04/10/08 1.00 30000.00 14007.11 3000.00 C0702-275 I-70 VAIL PASS 06/26/08 1.00 5000.00 2803.75 115.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 17500.00 9525.77 1557.50 SHE0831-102 PARKER RD: LONG AVE INTERSECT 07/24/08 1.00 2500.00 1083.00 700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 2500.00 1083.00 700.00 BRS120A-008 ON SH 120 AT MP 2.76 IN FREMO 10/09/08 1.00 5000.00 6305.54 3874.33 SHE 0451-009 SH45 (PUEBLO BLVD) AND RED CR 12/04/08 1.00 5000.00 2682.20 1600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 5000.00 5011.49 2737.17 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 10250.00 6480.42 2690.54 =============== 202-00001 Rem Structure Each =================================================== NH0853-066 US 85C SH 60 TO LASALLE 01/10/08 8.00 800.00 1329.42 2100.00 STA 093A-007 ON SH 93 IN BOULDER COUNTY 01/24/08 1.00 1200.00 1502.37 2500.00 CCR600-303 CHATFIELD STATE PARK MAIN RD, 01/31/08 2.00 1500.00 137.63 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11.00 963.64 1128.45 1774.55 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 34.00 659.00 709.64 645.00 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 7.00 250.00 1155.00 1500.00 STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 14.00 3000.00 1217.71 1008.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 55.00 1202.84 871.60 846.37 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 1.00 800.00 768.92 580.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 4 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00001 Rem Structure Each =================================================== BR 0361-088 US36 AND CHERRYVALE RD 10/16/08 1.00 1500.00 677.91 500.00 C0063-027 US 6 LOMA STR H-01-E, MP 13.1 12/11/08 2.00 20000.00 11360.00 6500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 10575.00 6326.41 3520.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 70.00 1700.80 1274.18 1145.01 =============== 202-00002 Rem of Structure (Spec) Each =================================================== NH5501-013 US 550 N OF NM STATE LINE, MP 04/10/08 5.00 10000.00 9978.92 3700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 10000.00 9978.92 3700.00 NH 1602-117 THIS PROJECT IS LOCATED ABOUT 12/04/08 1.00 10000.00 22078.11 3600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 10000.00 22078.11 3600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 10000.00 11402.36 3683.33 =============== 202-00008 Tree Trimming Hour =================================================== STA0831-106 PARKER RD. (SH 83) MP 65.5 TO 07/10/08 10.00 182.00 193.98 174.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 182.00 193.98 174.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 182.00 193.98 174.80 =============== 202-00010 Rem Tree Each =================================================== STA1251-006 WINDY GAP RES-GRAND COUNTY 03/27/08 671.00 100.00 101.50 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 671.00 100.00 101.50 125.00 NH5501-013 US 550 N OF NM STATE LINE, MP 04/10/08 8.00 400.00 418.53 340.00 NH 0503-064 US 50:15TH AND 16TH ST IN CAN 04/17/08 22.00 200.00 299.61 300.00 IM 0705-077 I70 WEST OF BURLINGTON EAST I 04/17/08 38.00 357.00 404.93 464.67 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 5 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00010 Rem Tree Each =================================================== HB0403-052 US40 BERTHOUD PASS 04/24/08 12.00 350.00 378.46 437.83 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 5.00 400.00 903.33 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 85.00 321.95 404.68 438.02 STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 29.00 224.00 582.46 335.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 29.00 224.00 582.46 335.00 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 21.00 400.00 509.91 430.00 BR 0361-088 US36 AND CHERRYVALE RD 10/16/08 30.00 135.00 541.25 200.00 SHE 0451-009 SH45 (PUEBLO BLVD) AND RED CR 12/04/08 9.00 300.00 294.53 306.67 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 60.00 252.50 503.51 296.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 845.00 137.41 270.09 175.87 =============== 202-00011 Tree Trimming Each =================================================== STA 391A-003 KIPLING: 6TH AVE TO COLFAX 02/14/08 3.00 400.00 933.94 1002.57 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 400.00 933.94 1002.57 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 400.00 933.94 1002.57 =============== 202-00012 Rem Tree Stump Each =================================================== C0702-275 I-70 VAIL PASS 06/26/08 1.00 600.00 743.98 475.00 STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 249.00 200.00 212.75 256.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 250.00 201.60 213.70 257.13 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 250.00 201.60 213.70 257.13 =============== 202-00015 Rem Headwall Each =================================================== HB131A-033 SH 131 ROUTT COUNTY 01/10/08 23.00 1500.00 571.00 555.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 6 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00015 Rem Headwall Each =================================================== STA2873-148 FEDRERAL BLVD (SH 287) AT 70T 02/07/08 1.00 1500.00 700.12 676.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 24.00 1500.00 576.38 560.04 NH 2871-031 US 287 SOUTH OF LAMAR FROM MP 04/03/08 2.00 1500.00 511.12 513.50 C 1191-023 FROM MP 0.0 TO MP 2.6 GILPIN 04/03/08 4.00 881.00 2767.14 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 1087.33 2369.02 904.50 NH 1602-117 THIS PROJECT IS LOCATED ABOUT 12/04/08 1.00 1000.00 1560.84 1200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1000.00 1560.84 1200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 31.00 1404.00 987.06 647.35 =============== 202-00019 Rem Inlet Each =================================================== NH0853-066 US 85C SH 60 TO LASALLE 01/10/08 1.00 1000.00 992.17 1600.00 STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 3.00 1000.00 872.03 720.00 SHE0741-016 THE INTERSECTION OF SH 74 AND 02/14/08 1.00 1100.00 1093.00 1300.00 C 0253-202 I-25 02/15/08 1.00 2000.00 2500.00 2500.00 STA 002A-001 COLO. BLVD(SH 2A): MEXICO TO 02/28/08 2.00 900.00 1319.57 1623.99 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 1112.50 1127.80 1351.00 NH5501-013 US 550 N OF NM STATE LINE, MP 04/10/08 5.00 1400.00 938.25 450.00 NH 0503-064 US 50:15TH AND 16TH ST IN CAN 04/17/08 8.00 800.00 1875.12 1000.00 SHE 2854-114 SH 285-BRADEY CT. 05/01/08 1.00 1500.00 1346.53 530.00 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 31.00 1400.00 836.67 1000.00 C119A-054 SH 119 FROM MP 6.5 TO MP 8.0 06/19/08 1.00 1200.00 1720.83 1500.00 STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 2.00 1100.00 685.64 507.38 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 48.00 1285.42 1028.38 922.81 NH 2854-109 US 285: DEER CREEK INTERCHANG 07/31/08 2.00 894.00 655.34 650.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 7 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00019 Rem Inlet Each =================================================== STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 13.00 1100.00 645.50 665.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 15.00 1072.53 646.65 663.00 SHE 0451-009 SH45 (PUEBLO BLVD) AND RED CR 12/04/08 1.00 1200.00 1565.00 1645.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1200.00 1565.00 1645.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 72.00 1220.67 926.97 926.29 =============== 202-00021 Rem Manhole Each =================================================== NH 0503-064 US 50:15TH AND 16TH ST IN CAN 04/17/08 2.00 1500.00 2281.80 1400.00 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 7.00 400.00 1093.33 950.00 STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 1.00 1500.00 958.30 507.38 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 730.00 1257.65 995.74 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 730.00 1257.65 995.74 =============== 202-00023 Rem Emb Prot Ty 3 Each =================================================== STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 1.00 800.00 765.12 940.00 IM0703-327 I-70 SILVERTHORNE TO EJMT 03/20/08 4.00 459.00 904.54 2150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 527.20 889.05 1908.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 527.20 889.05 1908.00 =============== 202-00024 Rem Emb Prot Ty 5 Each =================================================== STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 2.00 300.00 691.02 940.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 300.00 691.02 940.00 BR 0361-088 US36 AND CHERRYVALE RD 10/16/08 2.00 600.00 587.55 175.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 600.00 587.55 175.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 450.00 625.17 557.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 8 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00025 Rem Ditch Lining Lin Foot =============================================== STA2873-148 FEDRERAL BLVD (SH 287) AT 70T 02/07/08 20.00 17.00 41.45 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 17.00 41.45 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 17.00 41.45 50.00 =============== 202-00026 Rem S and D Pave Sq Yard ================================================ IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 1,233.00 5.75 8.99 5.00 STA0703-334 I-70 FROM BAKERVILLE TO EAST 05/15/08 216.00 11.25 33.37 19.05 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 8.00 30.00 74.93 41.00 STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 56.00 30.00 26.85 12.47 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,513.00 7.56 11.89 7.47 NH 2854-109 US 285: DEER CREEK INTERCHANG 07/31/08 66.00 17.75 24.34 40.00 SHE R600-310 US285/FED, I-25/120TH, I-270/ 08/14/08 7.70 50.00 184.99 125.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 73.70 21.12 38.57 48.98 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,586.70 8.19 12.78 9.40 =============== 202-00027 Rem Riprap Sq Yard ================================================ IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 32.00 26.00 19.80 10.00 NH5501-013 US 550 N OF NM STATE LINE, MP 04/10/08 37.00 20.00 39.08 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 69.00 22.78 28.19 20.72 STA0831-106 PARKER RD. (SH 83) MP 65.5 TO 07/10/08 56.00 11.75 21.74 55.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 56.00 11.75 21.74 55.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 125.00 17.84 25.17 36.44 =============== 202-00033 Rem Pipe Each =================================================== HB131A-033 SH 131 ROUTT COUNTY 01/10/08 29.00 400.00 1631.00 355.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 9 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00033 Rem Pipe Each =================================================== NH0342-043 ON US 34 IN WELD COUNTY 01/24/08 1.00 1100.00 1222.13 1000.00 HB0132-017 SH13 WY STATE LINE SOUTH OVER 03/13/08 2.00 950.00 3065.83 9200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 32.00 456.25 1727.79 927.97 NH 2871-031 US 287 SOUTH OF LAMAR FROM MP 04/03/08 64.00 2000.00 1166.30 847.28 C 1191-023 FROM MP 0.0 TO MP 2.6 GILPIN 04/03/08 4.00 860.00 3923.57 2400.00 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 2.00 891.00 2439.54 1371.00 NH5501-013 US 550 N OF NM STATE LINE, MP 04/10/08 9.00 1000.00 1541.25 950.00 STA 009A-001 SH 9 HOOSIER PASS NORTH - PHA 05/01/08 14.00 1300.00 1279.75 1539.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 93.00 1724.97 1530.45 1039.40 C1601-057 ON U.S. 160, APPROXIMATELY M. 12/04/08 2.00 1900.00 2896.11 2100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 1900.00 2896.11 2100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 127.00 1408.05 1622.88 1028.02 =============== 202-00035 Rem Pipe Lin Foot =============================================== NH0853-066 US 85C SH 60 TO LASALLE 01/10/08 750.00 12.00 17.16 5.00 STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 903.00 18.00 15.38 14.00 STA2873-148 FEDRERAL BLVD (SH 287) AT 70T 02/07/08 75.00 30.00 36.78 50.00 STA 017A-010 BEGINNING OF SH 17 FROM MP 69 02/14/08 16.00 20.00 116.02 65.00 SHE0702-276 EAGLE COUNTY I-70 MP 171 TO M 03/13/08 14.00 450.00 47.33 23.00 IM0703-327 I-70 SILVERTHORNE TO EJMT 03/20/08 100.00 25.00 135.75 42.75 BR 0403-051 US 40 MP 245.85 03/27/08 20.00 62.00 85.00 85.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,878.00 20.16 28.43 14.63 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 1,862.00 12.75 19.99 40.00 C 067A-026 SH67 AND CR81 04/10/08 71.00 50.00 50.30 35.00 NH 0503-064 US 50:15TH AND 16TH ST IN CAN 04/17/08 58.00 15.00 78.30 50.00 IM 0705-077 I70 WEST OF BURLINGTON EAST I 04/17/08 2,145.00 16.75 20.97 15.83 STA009A-025 SH9 FROM FAIRPLAY TO HARTSEL 05/01/08 90.00 30.00 25.17 13.00 NH0504-056 US 50 PASSING LANES EAST OF 5 05/15/08 151.00 50.00 27.86 25.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 10 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00035 Rem Pipe Lin Foot =============================================== NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 2,229.00 12.00 26.50 16.00 C119A-054 SH 119 FROM MP 6.5 TO MP 8.0 06/19/08 86.00 45.00 53.92 32.00 SHE3921-008 SH 392 @ WCR 31(HES) 06/19/08 109.00 20.00 27.47 12.50 C 1601-060 US 160 MONTEZUMA COUNTY 06/26/08 59.00 80.00 94.10 54.00 STA 069A-023 SH 69 WESTCLIFFE AREA - CUSTE 06/26/08 8.00 20.00 102.67 120.00 STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 2,819.00 15.00 14.42 7.18 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 9,687.00 15.93 19.84 18.88 STA0831-106 PARKER RD. (SH 83) MP 65.5 TO 07/10/08 23.00 73.00 22.61 20.20 NH 2854-109 US 285: DEER CREEK INTERCHANG 07/31/08 208.00 23.00 18.76 16.00 STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 709.00 17.25 24.31 23.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 940.00 19.89 23.18 21.38 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 72.00 35.00 22.45 10.00 BR 0361-088 US36 AND CHERRYVALE RD 10/16/08 94.00 17.50 25.69 30.00 NH 1602-117 THIS PROJECT IS LOCATED ABOUT 12/04/08 228.00 25.00 37.23 42.00 SHE 0451-009 SH45 (PUEBLO BLVD) AND RED CR 12/04/08 8.00 50.00 126.03 115.63 C1601-057 ON U.S. 160, APPROXIMATELY M. 12/04/08 150.00 100.00 52.14 83.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 552.00 45.77 36.52 47.99 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13,057.00 18.08 21.76 19.68 =============== 202-00037 Rem of End Section Each =================================================== STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 3.00 400.00 454.43 200.00 STA 0831-099 SH 83 AT RUSSELLVILLE ROAD SO 01/17/08 1.00 704.00 328.22 425.00 SHE0702-276 EAGLE COUNTY I-70 MP 171 TO M 03/13/08 3.00 400.00 224.00 87.00 BR 0403-051 US 40 MP 245.85 03/27/08 1.00 573.00 450.00 450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 459.63 351.50 217.00 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 2.00 403.00 360.82 250.00 NH5501-013 US 550 N OF NM STATE LINE, MP 04/10/08 13.00 350.00 242.57 70.00 NH0504-056 US 50 PASSING LANES EAST OF 5 05/15/08 10.00 200.00 255.29 350.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 11 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00037 Rem of End Section Each =================================================== STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 6.00 150.00 253.89 404.88 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 31.00 266.32 259.07 236.75 NH 2854-109 US 285: DEER CREEK INTERCHANG 07/31/08 3.00 363.00 312.17 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 363.00 312.17 150.00 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 13.00 250.00 334.59 140.00 NH1601-058 ON US 160, FROM M.P. 21.40 TO 10/09/08 3.00 180.00 536.60 1000.00 BR 0361-088 US36 AND CHERRYVALE RD 10/16/08 1.00 150.00 308.13 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 17.00 231.76 351.83 295.29 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 59.00 287.49 303.03 246.53 =============== 202-00090 Rem Delineator Each =================================================== HB131A-033 SH 131 ROUTT COUNTY 01/10/08 136.00 4.00 8.96 10.30 IM0701-189 PALISADE EAST 01/17/08 211.00 5.00 10.29 11.00 STA 0831-099 SH 83 AT RUSSELLVILLE ROAD SO 01/17/08 25.00 12.25 14.16 10.50 IM 0252-392 I-25, TOMAH ROAD TO DOUGLAS L 01/17/08 200.00 7.75 7.16 4.35 NH0342-043 ON US 34 IN WELD COUNTY 01/24/08 438.00 4.25 4.13 5.00 STA 093A-007 ON SH 93 IN BOULDER COUNTY 01/24/08 90.00 6.00 5.59 4.30 SHE 050A-007 SH 50 BETWEEN MORRIS/FORTINO 01/31/08 7.00 15.00 17.06 6.00 C 5502-063 US 550 SILVERTON TO RED MTN P 02/07/08 415.00 5.00 5.96 4.60 HB 0131-050 SH 13 NORTH OF RIFLE 02/07/08 4.00 10.00 17.00 12.00 IM 0252-386 I-25: RESURFACE 23RD TO 48TH 02/14/08 112.00 10.00 5.41 3.23 STA0252-397 I25 NORTHGATE NORTH 02/14/08 1,185.00 10.00 5.18 5.05 STA 079A-011 SH40 / SH79, SH40 (309.26-31 02/28/08 457.00 6.25 3.34 2.17 STU 0251-329 S OF COLORADO CITY TO CEDARWO 03/06/08 1,100.00 4.00 4.72 4.12 HB0132-017 SH13 WY STATE LINE SOUTH OVER 03/13/08 95.00 6.00 17.29 22.00 SHE0702-276 EAGLE COUNTY I-70 MP 171 TO M 03/13/08 10.00 25.00 10.67 10.00 IM0703-327 I-70 SILVERTHORNE TO EJMT 03/20/08 20.00 12.25 17.31 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,505.00 6.52 5.76 5.28 NH 2871-031 US 287 SOUTH OF LAMAR FROM MP 04/03/08 270.00 6.00 4.18 4.11 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 12 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00090 Rem Delineator Each =================================================== C 1191-023 FROM MP 0.0 TO MP 2.6 GILPIN 04/03/08 50.00 8.75 7.86 5.25 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 195.00 6.75 6.57 6.50 NH5501-013 US 550 N OF NM STATE LINE, MP 04/10/08 108.00 11.00 12.02 7.70 SHE 0501-056 US 50 AND 28.5 RD IN GRAND JU 04/10/08 4.00 15.00 13.07 13.00 C 067A-026 SH67 AND CR81 04/10/08 57.00 8.00 11.54 14.00 IM 0705-077 I70 WEST OF BURLINGTON EAST I 04/17/08 327.00 7.50 5.40 5.48 STA009A-025 SH9 FROM FAIRPLAY TO HARTSEL 05/01/08 366.00 7.50 27.58 26.75 NH0504-056 US 50 PASSING LANES EAST OF 5 05/15/08 169.00 6.00 8.27 8.00 STA0703-334 I-70 FROM BAKERVILLE TO EAST 05/15/08 50.00 11.50 7.97 15.35 SHE 0761-195 I-76: BURLINGTON CANAL TO BRO 05/15/08 325.00 8.00 7.01 6.75 STS 1151-021 SH 115 AT CR F45 IN FREMONT C 05/15/08 10.00 10.00 36.02 29.00 C0703-337 I-70 EMPIRE JCT. EAST OVERLAY 06/05/08 155.00 9.50 5.67 6.00 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 184.00 11.00 6.00 5.00 STA 069A-023 SH 69 WESTCLIFFE AREA - CUSTE 06/26/08 13.00 20.00 11.09 10.00 STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 84.00 5.50 4.60 4.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,367.00 7.94 8.88 9.65 STA0831-106 PARKER RD. (SH 83) MP 65.5 TO 07/10/08 23.00 13.25 34.08 156.20 SHE 070A-005 I-70 B FROM PATTERSON (F RD.) 07/17/08 1.00 5.40 18.14 21.20 STA 0404-044 WEST COLFAX AVE. (US 40) FROM 07/17/08 50.00 12.00 8.31 5.15 SHE0831-102 PARKER RD: LONG AVE INTERSECT 07/24/08 4.00 12.00 12.45 5.25 NH 2854-109 US 285: DEER CREEK INTERCHANG 07/31/08 70.00 11.25 7.61 5.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 148.00 11.79 12.76 28.78 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 101.00 8.00 6.58 10.00 BRS120A-008 ON SH 120 AT MP 2.76 IN FREMO 10/09/08 26.00 8.00 5.79 11.06 NH1601-058 ON US 160, FROM M.P. 21.40 TO 10/09/08 40.00 10.00 6.86 7.00 BR 0361-088 US36 AND CHERRYVALE RD 10/16/08 3.00 10.00 19.92 10.00 SHE 0821-082 SH 82/SMITH WAY - PITKIN 10/16/08 11.00 12.00 10.03 11.11 C1601-057 ON U.S. 160, APPROXIMATELY M. 12/04/08 92.00 5.00 6.31 5.50 C0063-027 US 6 LOMA STR H-01-E, MP 13.1 12/11/08 16.00 5.00 8.13 5.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 289.00 7.33 6.75 8.04 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,309.00 7.12 7.04 7.28 =============== 202-00155 Rem Wall Lin Foot =============================================== IM 0702-281 I-70 IN DOWD CANYON 04/30/08 100.00 110.00 497.50 240.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 100.00 110.00 497.50 240.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 13 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00155 Rem Wall Lin Foot =============================================== STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 221.00 37.00 61.64 26.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 221.00 37.00 61.64 26.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 321.00 59.74 151.19 93.01 =============== 202-00190 Rem of Conc Median Cover Matl Sq Yard ================================================ STA 093A-007 ON SH 93 IN BOULDER COUNTY 01/24/08 406.00 15.00 12.47 16.90 SHE 050A-007 SH 50 BETWEEN MORRIS/FORTINO 01/31/08 7,499.00 12.00 5.56 4.50 STA 002A-001 COLO. BLVD(SH 2A): MEXICO TO 02/28/08 3,200.00 9.50 15.81 18.39 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11,105.00 11.39 10.06 8.96 SHE R600-310 US285/FED, I-25/120TH, I-270/ 08/14/08 6.00 86.00 70.94 68.70 STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 212.00 9.00 10.44 20.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 218.00 11.12 11.63 22.07 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,323.00 11.38 10.10 9.21 =============== 202-00195 Rem of Median Cover Sq Yard ================================================ NH0853-066 US 85C SH 60 TO LASALLE 01/10/08 12.00 15.00 68.17 60.00 NH 0404-046 COLFAX AVE: ARAPAHOE/ADAMS CO 02/28/08 23.00 18.00 19.81 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 35.00 16.97 33.41 29.77 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 4,900.00 2.50 8.67 4.75 STA086A-048 INTERSECTION OF SH 86 & COUNT 06/26/08 2.00 60.00 143.50 230.00 STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 114.00 11.00 24.89 12.47 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,016.00 2.72 9.79 5.02 SHE 070A-005 I-70 B FROM PATTERSON (F RD.) 07/17/08 260.00 11.99 24.78 33.92 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 14 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00195 Rem of Median Cover Sq Yard ================================================ NH 2854-109 US 285: DEER CREEK INTERCHANG 07/31/08 1,082.00 5.75 6.55 5.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,342.00 6.96 9.59 11.01 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,393.00 3.68 9.98 6.41 =============== 202-00200 Rem Sidewalk Sq Yard ================================================ STA 093A-007 ON SH 93 IN BOULDER COUNTY 01/24/08 241.00 14.00 12.78 16.90 STA2873-148 FEDRERAL BLVD (SH 287) AT 70T 02/07/08 25.00 25.00 26.52 30.00 NH0405-032 COLFAX AVENUE FROM COLORADO 02/28/08 635.00 6.00 21.36 21.10 NH 0404-046 COLFAX AVE: ARAPAHOE/ADAMS CO 02/28/08 383.00 15.00 17.88 18.45 STA 002A-001 COLO. BLVD(SH 2A): MEXICO TO 02/28/08 175.00 20.00 29.56 18.39 STA052A-029 ON SH 52 IN WELD COUNTY 03/20/08 379.00 11.00 15.38 22.40 NH 1603-025 US 160 ALAMOSA MILL AND FILL 03/27/08 206.00 15.00 41.62 44.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,044.00 11.89 20.39 22.53 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 379.00 12.50 8.59 5.00 NH 030A-026 SH30 1ST AVE AT HAVANA ST TO 04/17/08 898.00 10.00 11.30 14.00 NH 0503-064 US 50:15TH AND 16TH ST IN CAN 04/17/08 1,096.00 13.00 16.99 20.00 STA 0343-026 ON US 34 IN YUMA COUNTY 04/17/08 63.00 25.00 32.33 32.00 SHE 2854-114 SH 285-BRADEY CT. 05/01/08 3.00 14.00 84.02 50.00 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 92.00 6.50 9.58 3.50 C119A-054 SH 119 FROM MP 6.5 TO MP 8.0 06/19/08 25.00 25.00 32.54 15.00 STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 23.00 20.00 25.87 12.47 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,579.00 12.12 12.90 15.33 STA0831-106 PARKER RD. (SH 83) MP 65.5 TO 07/10/08 37.00 28.00 17.93 35.00 SHE0831-102 PARKER RD: LONG AVE INTERSECT 07/24/08 29.00 60.00 20.52 12.00 STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 2,006.00 7.25 7.13 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,072.00 8.36 7.48 6.60 SHE 0451-009 SH45 (PUEBLO BLVD) AND RED CR 12/04/08 450.00 18.00 12.20 13.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 450.00 18.00 12.20 13.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,145.00 11.34 13.44 14.74 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 15 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00201 Rem Curb Lin Foot =============================================== STA 093A-007 ON SH 93 IN BOULDER COUNTY 01/24/08 1,415.00 5.00 4.26 3.45 C0253-199 I25 RUBBILIZATION N OF SH 56 01/24/08 10,949.00 5.41 3.72 5.70 HB 0131-050 SH 13 NORTH OF RIFLE 02/07/08 600.00 5.00 4.75 4.00 STA0252-397 I25 NORTHGATE NORTH 02/14/08 12,463.00 7.50 1.40 1.44 STU 0251-329 S OF COLORADO CITY TO CEDARWO 03/06/08 15,700.00 4.00 1.38 1.29 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 41,127.00 5.48 2.09 2.62 IM 0705-077 I70 WEST OF BURLINGTON EAST I 04/17/08 510.00 9.00 36.84 65.18 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 510.00 9.00 36.84 65.18 NH 2854-109 US 285: DEER CREEK INTERCHANG 07/31/08 860.00 6.25 3.94 6.00 BR R400-206 VARIOUS LOCATIONS IN REGION 4 09/11/08 24.00 35.00 68.48 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 884.00 7.03 5.69 7.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 42,521.00 5.56 2.73 3.48 =============== 202-00202 Rem Gutter Lin Foot =============================================== STA 093A-007 ON SH 93 IN BOULDER COUNTY 01/24/08 306.00 19.00 12.43 19.00 STA 002A-001 COLO. BLVD(SH 2A): MEXICO TO 02/28/08 72.00 20.00 19.59 15.12 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 378.00 19.19 13.97 18.26 STA 0404-044 WEST COLFAX AVE. (US 40) FROM 07/17/08 41.00 15.75 11.68 5.07 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 41.00 15.75 11.68 5.07 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 419.00 18.85 13.69 16.97 =============== 202-00203 Rem Curb and Gutter Lin Foot =============================================== NH0853-066 US 85C SH 60 TO LASALLE 01/10/08 485.00 5.00 9.18 10.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 16 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00203 Rem Curb and Gutter Lin Foot =============================================== STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 957.00 8.00 8.19 9.50 STA 093A-007 ON SH 93 IN BOULDER COUNTY 01/24/08 6,318.00 4.50 6.00 5.20 SHE 050A-007 SH 50 BETWEEN MORRIS/FORTINO 01/31/08 7,533.00 6.00 4.25 4.00 STA2873-148 FEDRERAL BLVD (SH 287) AT 70T 02/07/08 57.00 15.00 12.27 12.00 STA 391A-003 KIPLING: 6TH AVE TO COLFAX 02/14/08 15.00 40.00 45.19 34.83 NH0405-032 COLFAX AVENUE FROM COLORADO 02/28/08 798.00 4.50 12.83 7.65 NH 0404-046 COLFAX AVE: ARAPAHOE/ADAMS CO 02/28/08 383.00 8.00 9.23 8.50 STA 002A-001 COLO. BLVD(SH 2A): MEXICO TO 02/28/08 625.00 6.00 10.08 7.57 STA 079A-011 SH40 / SH79, SH40 (309.26-31 02/28/08 156.00 9.00 11.55 16.95 STA 072A-030 SH 72, 64TH AVE TO 84TH PKWY 03/13/08 93.00 20.00 11.39 5.90 STA052A-029 ON SH 52 IN WELD COUNTY 03/20/08 452.00 6.00 7.11 8.83 NH 1603-025 US 160 ALAMOSA MILL AND FILL 03/27/08 977.00 10.00 16.13 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 18,849.00 5.91 6.88 6.36 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 891.00 5.50 6.30 5.00 NH 030A-026 SH30 1ST AVE AT HAVANA ST TO 04/17/08 1,283.00 5.50 5.92 6.00 NH 0503-064 US 50:15TH AND 16TH ST IN CAN 04/17/08 1,993.00 5.00 10.19 15.00 STA 0343-026 ON US 34 IN YUMA COUNTY 04/17/08 824.00 10.00 11.67 12.00 IM 0705-077 I70 WEST OF BURLINGTON EAST I 04/17/08 669.00 7.00 7.03 8.22 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 24,402.00 5.00 5.08 5.50 C119A-054 SH 119 FROM MP 6.5 TO MP 8.0 06/19/08 154.00 20.00 9.63 5.00 STA086A-048 INTERSECTION OF SH 86 & COUNT 06/26/08 10.00 35.00 32.25 28.00 STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 235.00 15.00 9.93 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 30,461.00 5.38 5.90 6.43 STA0831-106 PARKER RD. (SH 83) MP 65.5 TO 07/10/08 1,546.00 5.75 6.14 8.50 SHE 070A-005 I-70 B FROM PATTERSON (F RD.) 07/17/08 550.00 5.57 8.23 7.42 STA 0404-044 WEST COLFAX AVE. (US 40) FROM 07/17/08 221.00 9.25 7.37 5.36 SHE0831-102 PARKER RD: LONG AVE INTERSECT 07/24/08 71.00 40.00 9.13 4.75 NH 2854-109 US 285: DEER CREEK INTERCHANG 07/31/08 2,436.00 5.75 4.93 6.00 STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 6,824.00 4.25 4.06 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 11,648.00 5.14 4.79 5.79 SHE 0451-009 SH45 (PUEBLO BLVD) AND RED CR 12/04/08 775.00 8.00 6.64 5.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 775.00 8.00 6.64 5.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 61,733.00 5.53 5.93 6.28 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 17 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00206 Rem Conc Curb Ramp Sq Yard ================================================ STA 093A-007 ON SH 93 IN BOULDER COUNTY 01/24/08 278.00 25.00 17.69 26.05 NH0405-032 COLFAX AVENUE FROM COLORADO 02/28/08 479.00 32.00 28.19 21.10 STA 002A-001 COLO. BLVD(SH 2A): MEXICO TO 02/28/08 90.00 50.00 31.36 23.81 STA 072A-030 SH 72, 64TH AVE TO 84TH PKWY 03/13/08 72.00 35.00 32.69 33.15 NH 1603-025 US 160 ALAMOSA MILL AND FILL 03/27/08 311.00 25.00 46.40 51.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,230.00 30.14 28.68 30.68 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 81.00 25.00 65.25 5.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 81.00 25.00 65.25 5.75 STA0831-106 PARKER RD. (SH 83) MP 65.5 TO 07/10/08 56.00 32.00 17.99 35.00 STA 0404-044 WEST COLFAX AVE. (US 40) FROM 07/17/08 52.00 31.00 26.14 10.88 SHE0831-102 PARKER RD: LONG AVE INTERSECT 07/24/08 7.00 50.00 33.34 20.00 STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 136.00 26.00 7.79 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 251.00 29.04 14.87 15.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,562.00 29.70 26.96 26.95 =============== 202-00210 Rem Conc Pavement Sq Yard ================================================ NH0853-066 US 85C SH 60 TO LASALLE 01/10/08 935.00 18.00 40.52 16.00 NH0342-048 US 34 IN WELD COUNTY 02/07/08 180.00 70.00 48.06 50.00 C 0253-202 I-25 02/15/08 2,284.00 25.00 30.00 30.00 STA 002A-001 COLO. BLVD(SH 2A): MEXICO TO 02/28/08 100.00 40.00 47.25 36.33 STA052A-029 ON SH 52 IN WELD COUNTY 03/20/08 334.00 18.00 17.12 19.49 NH 1603-025 US 160 ALAMOSA MILL AND FILL 03/27/08 263.00 22.00 39.73 51.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,096.00 24.98 35.26 28.33 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 36,501.00 2.80 5.29 3.50 NH 030A-026 SH30 1ST AVE AT HAVANA ST TO 04/17/08 30.00 40.00 16.38 15.00 NH 0503-064 US 50:15TH AND 16TH ST IN CAN 04/17/08 2,550.00 10.00 23.14 26.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 18 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00210 Rem Conc Pavement Sq Yard ================================================ IM 0705-077 I70 WEST OF BURLINGTON EAST I 04/17/08 18,940.00 8.25 4.98 2.38 STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 2,055.00 11.00 8.44 12.47 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 60,076.00 5.12 5.66 4.41 CR 600-275 I-70 VIADUCT - COLO. TO BRIGH 07/10/08 35.00 50.00 65.00 125.00 STA0831-106 PARKER RD. (SH 83) MP 65.5 TO 07/10/08 1,252.00 22.00 25.64 38.70 SHE R600-310 US285/FED, I-25/120TH, I-270/ 08/14/08 15.00 45.00 113.57 148.85 STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 613.00 19.75 10.77 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,915.00 21.97 21.97 32.91 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 446.00 20.00 21.64 26.26 SHE 0451-009 SH45 (PUEBLO BLVD) AND RED CR 12/04/08 67.00 25.00 25.80 22.49 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 513.00 20.65 21.90 25.77 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 66,600.00 6.95 7.07 6.87 =============== 202-00215 Rem Conc Pvmt (Planing) Sq Yard ================================================ C0253-199 I25 RUBBILIZATION N OF SH 56 01/24/08 19,222.00 8.02 11.83 9.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 19,222.00 8.02 11.83 9.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19,222.00 8.02 11.83 9.15 =============== 202-00220 Rem Asphalt Mat Sq Yard ================================================ STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 3,555.00 7.00 7.27 6.50 NH0342-043 ON US 34 IN WELD COUNTY 01/24/08 443.00 8.50 6.49 8.00 CCR600-303 CHATFIELD STATE PARK MAIN RD, 01/31/08 1,588.00 6.00 8.64 11.00 SHE 050A-007 SH 50 BETWEEN MORRIS/FORTINO 01/31/08 7,388.00 5.00 7.44 7.00 STA2873-148 FEDRERAL BLVD (SH 287) AT 70T 02/07/08 40.00 40.00 32.91 29.00 STA 017A-010 BEGINNING OF SH 17 FROM MP 69 02/14/08 1,534.00 8.00 6.60 5.75 SHE0741-016 THE INTERSECTION OF SH 74 AND 02/14/08 210.00 21.00 32.30 15.50 C 0253-202 I-25 02/15/08 760.00 20.00 15.00 15.00 NH 0404-046 COLFAX AVE: ARAPAHOE/ADAMS CO 02/28/08 50.00 30.00 20.64 14.40 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 19 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00220 Rem Asphalt Mat Sq Yard ================================================ STA 002A-001 COLO. BLVD(SH 2A): MEXICO TO 02/28/08 200.00 6.00 22.45 9.62 STU 0251-329 S OF COLORADO CITY TO CEDARWO 03/06/08 39.00 30.00 42.57 15.86 SHE0702-276 EAGLE COUNTY I-70 MP 171 TO M 03/13/08 5.00 100.00 47.33 72.00 STA 072A-030 SH 72, 64TH AVE TO 84TH PKWY 03/13/08 852.00 9.00 11.34 3.00 IM0703-327 I-70 SILVERTHORNE TO EJMT 03/20/08 70.00 33.00 28.43 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16,734.00 7.35 8.89 7.61 C 1191-023 FROM MP 0.0 TO MP 2.6 GILPIN 04/03/08 9,361.00 3.75 8.01 7.50 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 94,143.00 1.85 3.84 2.50 SHE 0501-056 US 50 AND 28.5 RD IN GRAND JU 04/10/08 1,470.00 14.00 9.98 12.00 C 067A-026 SH67 AND CR81 04/10/08 121.50 18.00 21.89 6.00 NH 0503-064 US 50:15TH AND 16TH ST IN CAN 04/17/08 3,979.00 5.00 17.08 13.00 STA 0343-026 ON US 34 IN YUMA COUNTY 04/17/08 8,165.00 4.00 10.95 12.50 IM 0704-207 I-70 FROM I-225 TO TOWER RD 04/17/08 474.00 5.00 18.08 17.30 IM 0705-077 I70 WEST OF BURLINGTON EAST I 04/17/08 37,723.00 2.85 2.70 3.30 SHE 2854-114 SH 285-BRADEY CT. 05/01/08 50.00 10.00 32.17 17.00 NH0063-024 US 6 EAGLE 05/22/08 1,088.00 8.00 41.35 42.00 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 107,776.00 2.00 3.51 2.50 C119A-054 SH 119 FROM MP 6.5 TO MP 8.0 06/19/08 438.00 15.00 25.50 12.00 SHE3921-008 SH 392 @ WCR 31(HES) 06/19/08 125.00 7.50 23.25 41.50 STA 069A-023 SH 69 WESTCLIFFE AREA - CUSTE 06/26/08 290.40 25.00 16.91 30.00 STA086A-048 INTERSECTION OF SH 86 & COUNT 06/26/08 34.00 60.00 59.25 45.00 STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 134,716.00 2.10 2.91 2.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 399,953.90 2.30 3.64 3.14 STA0831-106 PARKER RD. (SH 83) MP 65.5 TO 07/10/08 182.00 25.00 14.68 28.60 STA R400-147 ON SH 52 IN MORGAN COUNTY 07/24/08 5,333.00 4.50 2.66 2.00 SHE0831-102 PARKER RD: LONG AVE INTERSECT 07/24/08 338.00 15.00 17.94 10.00 NH 2854-109 US 285: DEER CREEK INTERCHANG 07/31/08 19,002.00 4.00 3.84 2.75 SHE R600-310 US285/FED, I-25/120TH, I-270/ 08/14/08 12.00 57.00 97.98 101.91 STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 13,064.00 2.90 5.61 7.50 BR R400-206 VARIOUS LOCATIONS IN REGION 4 09/11/08 215.00 25.00 20.20 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 38,146.00 4.03 4.47 4.56 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 8,964.00 4.00 3.71 3.94 BR 0361-088 US36 AND CHERRYVALE RD 10/16/08 3,897.00 6.00 3.30 2.90 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 20 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00220 Rem Asphalt Mat Sq Yard ================================================ SHE 0821-082 SH 82/SMITH WAY - PITKIN 10/16/08 946.00 18.00 9.75 10.00 NH 1602-117 THIS PROJECT IS LOCATED ABOUT 12/04/08 88.00 20.00 25.15 46.00 SHE 0451-009 SH45 (PUEBLO BLVD) AND RED CR 12/04/08 330.00 9.00 19.15 20.75 C0063-027 US 6 LOMA STR H-01-E, MP 13.1 12/11/08 233.00 5.00 11.23 2.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 14,458.00 5.68 4.17 4.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 469,291.90 2.72 3.85 3.46 =============== 202-00226 Rem of Asph Mat (Special) Sq Yard ================================================ STU 0251-329 S OF COLORADO CITY TO CEDARWO 03/06/08 257,547.00 1.50 0.76 0.71 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 257,547.00 1.50 0.76 0.71 CR 600-275 I-70 VIADUCT - COLO. TO BRIGH 07/10/08 2,408.00 25.00 54.67 34.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,408.00 25.00 54.67 34.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 259,955.00 1.72 1.06 1.02 =============== 202-00240 Rem Asphalt Mat (Planing) Sq Yard ================================================ NH 0821-085 SH82 EAGLE COUNTY 01/03/08 12,390.00 4.00 5.50 5.00 STA133A-034 133/187 RESURFACING 01/03/08 4,896.00 5.00 4.00 3.30 HB131A-033 SH 131 ROUTT COUNTY 01/10/08 444.00 6.00 19.94 11.00 NH0853-066 US 85C SH 60 TO LASALLE 01/10/08 67,309.00 2.25 2.28 2.10 STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 635.00 10.00 9.35 4.50 IM0701-189 PALISADE EAST 01/17/08 30,592.00 1.50 4.11 2.60 STA 0831-099 SH 83 AT RUSSELLVILLE ROAD SO 01/17/08 2,068.00 5.25 6.46 4.50 IM 0252-392 I-25, TOMAH ROAD TO DOUGLAS L 01/17/08 107,780.00 1.60 2.05 1.50 NH0342-043 ON US 34 IN WELD COUNTY 01/24/08 6,230.00 3.85 5.65 4.00 STA 093A-007 ON SH 93 IN BOULDER COUNTY 01/24/08 100,395.00 1.25 1.84 1.31 CCR600-303 CHATFIELD STATE PARK MAIN RD, 01/31/08 1,150.00 6.00 3.88 2.90 NH0342-048 US 34 IN WELD COUNTY 02/07/08 2,101.00 3.00 4.38 4.50 NH 2851-004 US 285 RESURFACE FROM NEW MEX 02/07/08 4,741.00 6.00 5.37 4.49 C 5502-063 US 550 SILVERTON TO RED MTN P 02/07/08 610.00 14.25 20.97 17.60 HB 0131-050 SH 13 NORTH OF RIFLE 02/07/08 561.00 10.00 19.31 13.00 HB135A-024 SH 135 CRESTED BUTTE SOUTH 02/14/08 6,366.00 5.00 5.68 4.00 IM 0252-386 I-25: RESURFACE 23RD TO 48TH 02/14/08 265,661.00 1.55 2.04 1.50 STA 391A-003 KIPLING: 6TH AVE TO COLFAX 02/14/08 42,916.00 1.80 1.62 1.52 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 21 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00240 Rem Asphalt Mat (Planing) Sq Yard ================================================ SHE0741-016 THE INTERSECTION OF SH 74 AND 02/14/08 1,546.00 6.00 7.12 3.50 STA0252-397 I25 NORTHGATE NORTH 02/14/08 317,984.00 2.25 1.74 1.58 NH 1602-116 SOUTH FORK EAST 02/14/08 14,236.00 2.50 2.69 3.17 NH0405-032 COLFAX AVENUE FROM COLORADO 02/28/08 81,856.00 1.55 2.33 1.45 NH 0404-046 COLFAX AVE: ARAPAHOE/ADAMS CO 02/28/08 49,497.00 1.55 1.41 1.45 STA 002A-001 COLO. BLVD(SH 2A): MEXICO TO 02/28/08 144,445.00 1.60 2.11 1.71 IM0252-393 DENVER - I-25 FROM SANTA FE D 02/28/08 126,350.00 1.60 2.03 2.00 STA 079A-011 SH40 / SH79, SH40 (309.26-31 02/28/08 35,151.00 2.25 2.61 3.54 C 0702-274 FRISCO (MM 201) TO EAST VAIL 03/06/08 1,667.00 64.00 33.14 49.00 STU 0251-329 S OF COLORADO CITY TO CEDARWO 03/06/08 66,044.00 1.50 4.39 4.25 HB0132-017 SH13 WY STATE LINE SOUTH OVER 03/13/08 2,197.00 5.25 5.46 5.00 SHE0702-276 EAGLE COUNTY I-70 MP 171 TO M 03/13/08 54,081.00 2.80 4.87 3.40 STA 072A-030 SH 72, 64TH AVE TO 84TH PKWY 03/13/08 70,799.00 1.50 1.44 0.95 IM0703-327 I-70 SILVERTHORNE TO EJMT 03/20/08 287,204.00 1.50 2.19 1.65 STA052A-029 ON SH 52 IN WELD COUNTY 03/20/08 27,001.00 1.60 1.85 1.85 NH 1603-025 US 160 ALAMOSA MILL AND FILL 03/27/08 109,327.00 1.80 2.99 1.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,046,230.00 1.86 2.26 1.91 NH 2871-031 US 287 SOUTH OF LAMAR FROM MP 04/03/08 10,947.00 3.00 5.62 6.91 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 8,804.00 2.85 2.87 3.25 NH5501-013 US 550 N OF NM STATE LINE, MP 04/10/08 1,944.00 6.00 7.80 9.60 SHE 0501-056 US 50 AND 28.5 RD IN GRAND JU 04/10/08 2,980.00 6.00 6.87 4.75 C 067A-026 SH67 AND CR81 04/10/08 622.00 8.00 9.00 13.00 NH 030A-026 SH30 1ST AVE AT HAVANA ST TO 04/17/08 108,307.00 1.20 1.87 1.52 IM 0705-077 I70 WEST OF BURLINGTON EAST I 04/17/08 5,641.00 4.25 3.10 3.58 STA009A-025 SH9 FROM FAIRPLAY TO HARTSEL 05/01/08 961.00 8.75 12.92 6.75 NH0504-056 US 50 PASSING LANES EAST OF 5 05/15/08 17,494.00 5.00 4.15 3.55 STS 1151-021 SH 115 AT CR F45 IN FREMONT C 05/15/08 1,200.00 5.00 8.93 6.50 NH0063-024 US 6 EAGLE 05/22/08 417.00 10.00 38.85 33.00 C0703-337 I-70 EMPIRE JCT. EAST OVERLAY 06/05/08 201,362.00 2.05 2.46 1.80 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 2,640.00 9.00 4.13 2.10 C119A-054 SH 119 FROM MP 6.5 TO MP 8.0 06/19/08 13,155.00 3.25 2.47 2.30 SHE3921-008 SH 392 @ WCR 31(HES) 06/19/08 447.00 1.50 9.73 13.00 STA 069A-023 SH 69 WESTCLIFFE AREA - CUSTE 06/26/08 1,073.50 8.00 6.80 8.00 STA086A-048 INTERSECTION OF SH 86 & COUNT 06/26/08 1,434.00 6.00 7.81 4.25 STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 2,306.00 4.00 5.26 5.09 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 381,734.50 2.25 2.67 2.23 CR 600-275 I-70 VIADUCT - COLO. TO BRIGH 07/10/08 72,017.00 6.30 5.50 6.50 STA 0404-044 WEST COLFAX AVE. (US 40) FROM 07/17/08 57,744.00 2.10 1.93 1.69 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 22 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00240 Rem Asphalt Mat (Planing) Sq Yard ================================================ SHE0831-102 PARKER RD: LONG AVE INTERSECT 07/24/08 472.00 10.00 12.46 9.00 NH 2854-109 US 285: DEER CREEK INTERCHANG 07/31/08 9,437.00 2.90 2.43 2.15 STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 21,870.00 2.30 2.21 2.85 BR R400-206 VARIOUS LOCATIONS IN REGION 4 09/11/08 1,889.00 9.00 8.81 9.00 NH 0501-057 ON US HWY 50 FROM MP. 38.0 TO 09/11/08 19,415.00 3.65 8.50 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 182,844.00 4.08 3.21 4.19 BRS120A-008 ON SH 120 AT MP 2.76 IN FREMO 10/09/08 2,639.00 6.00 3.14 3.47 NH1601-058 ON US 160, FROM M.P. 21.40 TO 10/09/08 178.00 20.00 41.80 50.00 SHE 0821-082 SH 82/SMITH WAY - PITKIN 10/16/08 839.00 7.00 7.50 6.00 NH 1602-117 THIS PROJECT IS LOCATED ABOUT 12/04/08 10,767.00 6.00 5.26 4.10 SHE 0451-009 SH45 (PUEBLO BLVD) AND RED CR 12/04/08 580.00 8.00 11.18 6.90 C1601-057 ON U.S. 160, APPROXIMATELY M. 12/04/08 712.00 29.00 14.57 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 15,715.00 7.33 5.85 4.76 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,626,523.50 2.11 2.40 2.13 =============== 202-00246 Rem Asphalt Mat (Planing)(Special) Sq Yard ================================================ STU 0251-329 S OF COLORADO CITY TO CEDARWO 03/06/08 2,747.00 3.00 26.06 25.31 STA 072A-030 SH 72, 64TH AVE TO 84TH PKWY 03/13/08 110.00 12.00 17.97 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,857.00 3.35 25.63 24.57 C119A-054 SH 119 FROM MP 6.5 TO MP 8.0 06/19/08 1,667.00 12.00 2.50 2.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,667.00 12.00 2.50 2.35 CR 600-275 I-70 VIADUCT - COLO. TO BRIGH 07/10/08 1,050.00 15.00 103.00 49.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,050.00 15.00 103.00 49.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,574.00 8.13 26.08 22.52 =============== 202-00250 Rem Pavement Marking Sq Foot ================================================ NH 0821-085 SH82 EAGLE COUNTY 01/03/08 1,880.00 2.00 2.00 2.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 23 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00250 Rem Pavement Marking Sq Foot ================================================ NH0853-066 US 85C SH 60 TO LASALLE 01/10/08 800.00 1.35 1.95 2.00 STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 41,615.00 1.00 1.30 1.20 STA 0831-099 SH 83 AT RUSSELLVILLE ROAD SO 01/17/08 1,500.00 2.50 2.38 2.10 SHE 050A-007 SH 50 BETWEEN MORRIS/FORTINO 01/31/08 3,376.00 3.00 2.65 3.00 NH 5502-060 US 550B MILE POST 106.272 TO 02/07/08 1,043.00 3.00 3.38 4.00 STA2873-148 FEDRERAL BLVD (SH 287) AT 70T 02/07/08 200.00 3.00 2.16 2.50 C 0253-202 I-25 02/15/08 630.00 5.00 4.00 4.00 NH0405-032 COLFAX AVENUE FROM COLORADO 02/28/08 4,500.00 2.00 1.85 1.55 STA060A-012 SH 60 US 85 WEST & SH 257 MIL 02/28/08 1,299.00 2.00 1.72 1.95 STA 002A-001 COLO. BLVD(SH 2A): MEXICO TO 02/28/08 9,000.00 3.00 1.25 1.08 MTCER500-096 US HIGHWAYS IN REGION 02/28/08 1,050,000.00 0.42 0.59 0.17 SRP083A-032 HIGHWAY 83 AND HODGEN IN EL P 03/20/08 173.00 4.00 3.72 2.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,116,016.00 0.49 0.67 0.24 NH 2871-031 US 287 SOUTH OF LAMAR FROM MP 04/03/08 19,418.00 1.30 1.61 1.54 C 1191-023 FROM MP 0.0 TO MP 2.6 GILPIN 04/03/08 2,500.00 1.75 4.71 2.00 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 62,383.00 0.65 0.96 0.85 NH5501-013 US 550 N OF NM STATE LINE, MP 04/10/08 2,670.00 2.00 2.06 2.00 NH 0503-064 US 50:15TH AND 16TH ST IN CAN 04/17/08 8,448.00 1.30 2.18 2.30 IM 0704-207 I-70 FROM I-225 TO TOWER RD 04/17/08 40,000.00 1.00 0.97 0.93 IM 0705-077 I70 WEST OF BURLINGTON EAST I 04/17/08 19,305.00 1.20 0.95 0.88 NH 5502-059 US 550 DURANGO MP 24.183 NORT 04/24/08 6,200.00 3.00 2.35 2.40 C0703-337 I-70 EMPIRE JCT. EAST OVERLAY 06/05/08 28,500.00 1.25 1.38 1.10 SHE3921-008 SH 392 @ WCR 31(HES) 06/19/08 4,300.00 1.00 1.33 1.20 STA086A-048 INTERSECTION OF SH 86 & COUNT 06/26/08 196.00 3.00 2.63 4.50 C0702-275 I-70 VAIL PASS 06/26/08 210.00 4.50 4.81 4.00 STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 4,000.00 1.25 1.54 1.44 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 198,130.00 1.08 1.19 1.14 CR 600-275 I-70 VIADUCT - COLO. TO BRIGH 07/10/08 1,000.00 4.00 5.67 7.00 STA0831-106 PARKER RD. (SH 83) MP 65.5 TO 07/10/08 3,700.00 1.95 1.78 1.75 STA R400-147 ON SH 52 IN MORGAN COUNTY 07/24/08 500.00 2.00 2.22 2.05 SHE0831-102 PARKER RD: LONG AVE INTERSECT 07/24/08 5,543.00 1.00 1.42 1.30 NH 2854-109 US 285: DEER CREEK INTERCHANG 07/31/08 14,000.00 1.30 1.23 1.15 SHE R600-310 US285/FED, I-25/120TH, I-270/ 08/14/08 1,742.00 2.10 2.71 2.58 STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 33,030.00 0.95 1.30 1.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 59,515.00 1.19 1.41 1.40 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 25,450.00 1.00 0.83 0.75 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 24 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00250 Rem Pavement Marking Sq Foot ================================================ BR 0361-088 US36 AND CHERRYVALE RD 10/16/08 1,798.00 1.50 2.22 2.00 SHE 0821-082 SH 82/SMITH WAY - PITKIN 10/16/08 1,035.00 1.50 2.63 2.50 SHE 0451-009 SH45 (PUEBLO BLVD) AND RED CR 12/04/08 5,375.00 1.25 2.41 1.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 33,658.00 1.08 1.04 1.03 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,407,319.00 0.62 0.86 0.44 =============== 202-00300 Rem Bldg(s) LUMP SUM =============================================== STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 1.00 50000.00 117215.05 149900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 50000.00 117215.05 149900.00 NH 0503-064 US 50:15TH AND 16TH ST IN CAN 04/17/08 1.00 50000.00 43462.31 60000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 50000.00 43462.31 60000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 50000.00 85606.73 104950.00 =============== 202-00400 Rem Bridge Each =================================================== STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 2.00 261000.00 130475.01 160000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 261000.00 130475.01 160000.00 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 5.00 41600.00 74436.98 62000.00 IM 0705-077 I70 WEST OF BURLINGTON EAST I 04/17/08 2.00 61300.00 66453.45 53667.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7.00 47228.57 72985.43 59619.21 STA R400-147 ON SH 52 IN MORGAN COUNTY 07/24/08 1.00 50000.00 26379.20 20000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 50000.00 26379.20 20000.00 BRS120A-008 ON SH 120 AT MP 2.76 IN FREMO 10/09/08 2.00 25000.00 81230.19 62741.37 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 25 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00400 Rem Bridge Each =================================================== BR 0361-088 US36 AND CHERRYVALE RD 10/16/08 1.00 130000.00 86284.54 98800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 60000.00 82645.41 74760.91 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13.00 83276.92 75387.00 75509.02 =============== 202-00420 Removal of Pedestrian Rail Lin Foot =============================================== NH 0404-046 COLFAX AVE: ARAPAHOE/ADAMS CO 02/28/08 40.00 20.00 24.50 15.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 40.00 20.00 24.50 15.05 STA086A-048 INTERSECTION OF SH 86 & COUNT 06/26/08 10.00 25.00 40.13 18.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 25.00 40.13 18.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 21.00 26.24 15.74 =============== 202-00425 Rem Bridge Railing Lin Foot =============================================== STA 093A-007 ON SH 93 IN BOULDER COUNTY 01/24/08 162.00 8.00 11.23 6.25 STA0252-397 I25 NORTHGATE NORTH 02/14/08 928.70 12.00 4.29 5.06 STU 0251-329 S OF COLORADO CITY TO CEDARWO 03/06/08 765.00 8.00 2.79 2.24 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,855.70 10.00 4.42 4.00 NH 2871-031 US 287 SOUTH OF LAMAR FROM MP 04/03/08 794.00 9.00 5.29 5.14 IM 0705-077 I70 WEST OF BURLINGTON EAST I 04/17/08 510.00 10.50 26.12 8.77 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 619.00 10.00 26.43 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,923.00 9.72 18.90 17.32 BR R400-206 VARIOUS LOCATIONS IN REGION 4 09/11/08 320.00 8.00 17.93 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 320.00 8.00 17.93 10.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 26 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00425 Rem Bridge Railing Lin Foot =============================================== C1601-057 ON U.S. 160, APPROXIMATELY M. 12/04/08 171.00 10.00 6.21 17.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 171.00 10.00 6.21 17.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,269.70 9.72 11.70 10.97 =============== 202-00450 Rem Port Present Str (1) Sq Yard ================================================ NH 2851-004 US 285 RESURFACE FROM NEW MEX 02/07/08 41.00 150.00 224.55 213.20 IM0703-327 I-70 SILVERTHORNE TO EJMT 03/20/08 21.00 152.00 101.21 98.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 62.00 150.68 162.14 174.30 C0703-337 I-70 EMPIRE JCT. EAST OVERLAY 06/05/08 39.00 153.00 155.33 150.00 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 23.00 70.00 593.33 450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 62.00 122.21 317.82 261.29 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 124.00 136.44 218.04 217.79 =============== 202-00453 Rem Port Present Str (2) Sq Yard ================================================ STA 072A-030 SH 72, 64TH AVE TO 84TH PKWY 03/13/08 11.00 225.00 259.36 270.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11.00 225.00 259.36 270.00 CR 600-275 I-70 VIADUCT - COLO. TO BRIGH 07/10/08 1,050.00 130.00 188.67 196.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,050.00 130.00 188.67 196.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,061.00 130.98 190.35 196.77 =============== 202-00454 Rem Port Present Str (2A) Sq Yard ================================================ IM0703-327 I-70 SILVERTHORNE TO EJMT 03/20/08 14.00 246.00 182.06 178.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 14.00 246.00 182.06 178.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 27 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00454 Rem Port Present Str (2A) Sq Yard ================================================ C0703-337 I-70 EMPIRE JCT. EAST OVERLAY 06/05/08 39.00 165.00 174.00 170.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 39.00 165.00 174.00 170.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 53.00 186.40 177.94 172.11 =============== 202-00456 Rem Port Present Str (2B) Sq Yard ================================================ IM0703-327 I-70 SILVERTHORNE TO EJMT 03/20/08 14.00 303.00 183.31 178.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 14.00 303.00 183.31 178.00 C0703-337 I-70 EMPIRE JCT. EAST OVERLAY 06/05/08 39.00 167.00 187.67 180.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 39.00 167.00 187.67 180.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 53.00 202.92 185.54 179.47 =============== 202-00460 Rem Port Present Str (3) Sq Yard ================================================ NH 2851-004 US 285 RESURFACE FROM NEW MEX 02/07/08 35.00 250.00 389.75 364.01 IM0703-327 I-70 SILVERTHORNE TO EJMT 03/20/08 11.00 476.00 379.03 365.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 46.00 304.04 385.61 364.25 CR 600-275 I-70 VIADUCT - COLO. TO BRIGH 07/10/08 53.00 525.00 491.67 475.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 53.00 525.00 491.67 475.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 99.00 422.33 429.19 423.54 =============== 202-00462 Rem Port Present Str (3A) Sq Yard ================================================ IM0703-327 I-70 SILVERTHORNE TO EJMT 03/20/08 11.00 629.00 379.03 365.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11.00 629.00 379.03 365.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 629.00 379.03 365.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 28 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00480 Rem Port Present Str (Special) Sq Yard ================================================ CR 600-275 I-70 VIADUCT - COLO. TO BRIGH 07/10/08 3,793.00 150.00 211.67 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,793.00 150.00 211.67 75.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,793.00 150.00 211.67 75.00 =============== 202-00495 Rem Port Present Str LUMP SUM =============================================== STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 1.00 20000.00 33569.54 35000.00 NH 160A-002 DOUBLE TREE BRIDGE ( O-05-AJ) 01/17/08 1.00 35000.00 40000.00 35000.00 HB0132-017 SH13 WY STATE LINE SOUTH OVER 03/13/08 1.00 40000.00 8638.00 10000.00 IM0703-327 I-70 SILVERTHORNE TO EJMT 03/20/08 1.00 35000.00 894.21 845.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 32500.00 13662.99 20211.25 NH 2871-031 US 287 SOUTH OF LAMAR FROM MP 04/03/08 1.00 130000.00 63000.23 61620.00 C 1191-023 FROM MP 0.0 TO MP 2.6 GILPIN 04/03/08 1.00 3000.00 10497.14 6000.00 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 1.00 18500.00 30630.44 30000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 50500.00 28323.93 32540.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 40214.29 20805.50 25495.00 =============== 202-00500 Rem Port Present Str Each =================================================== STU 0251-329 S OF COLORADO CITY TO CEDARWO 03/06/08 3.00 3000.00 4218.02 3090.11 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 3000.00 4218.02 3090.11 IM 0705-077 I70 WEST OF BURLINGTON EAST I 04/17/08 4.00 18800.00 4410.46 3767.31 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 18800.00 4410.46 3767.31 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 1.00 6000.00 1283.52 622.94 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 6000.00 1283.52 622.94 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 11275.00 3599.96 3120.31 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 29 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00502 Rem Port Present Str Cubic Yard ============================================= SHE0702-276 EAGLE COUNTY I-70 MP 171 TO M 03/13/08 55.00 800.00 400.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 55.00 800.00 400.00 100.00 SHE 0821-082 SH 82/SMITH WAY - PITKIN 10/16/08 114.00 45.00 48.50 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 114.00 45.00 48.50 20.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 169.00 290.71 141.89 46.04 =============== 202-00503 Rem Port Present Str Sq Yard ================================================ NH 2851-004 US 285 RESURFACE FROM NEW MEX 02/07/08 6.00 500.00 750.25 676.01 IM0252-393 DENVER - I-25 FROM SANTA FE D 02/28/08 20.00 1200.00 434.77 418.95 SHE0702-276 EAGLE COUNTY I-70 MP 171 TO M 03/13/08 16.20 2000.00 325.67 242.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 42.20 1407.58 449.64 387.57 C0703-337 I-70 EMPIRE JCT. EAST OVERLAY 06/05/08 16.00 362.00 258.00 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16.00 362.00 258.00 250.00 CR 600-275 I-70 VIADUCT - COLO. TO BRIGH 07/10/08 1,308.00 1696.18 1272.64 1793.52 BRS R200-154 I-25 MP 59.09, MP 65.6, MP 79 09/04/08 20.00 300.00 253.75 205.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,328.00 1675.15 1252.28 1769.59 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,386.20 1651.85 1211.80 1709.98 =============== 202-00504 Rem Exp Device Lin Foot =============================================== IM 0252-392 I-25, TOMAH ROAD TO DOUGLAS L 01/17/08 87.00 125.00 278.09 339.15 STA0252-397 I25 NORTHGATE NORTH 02/14/08 108.00 105.00 76.01 57.47 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 30 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00504 Rem Exp Device Lin Foot =============================================== IM0252-393 DENVER - I-25 FROM SANTA FE D 02/28/08 209.00 150.00 302.10 292.95 SHE0702-276 EAGLE COUNTY I-70 MP 171 TO M 03/13/08 532.20 75.00 36.33 63.00 IM0703-327 I-70 SILVERTHORNE TO EJMT 03/20/08 160.00 88.00 35.14 33.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,096.20 98.12 115.24 123.84 C0703-337 I-70 EMPIRE JCT. EAST OVERLAY 06/05/08 433.00 33.00 37.78 37.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 433.00 33.00 37.78 37.00 CR 600-275 I-70 VIADUCT - COLO. TO BRIGH 07/10/08 630.00 200.00 228.33 325.00 BR R400-206 VARIOUS LOCATIONS IN REGION 4 09/11/08 353.00 145.00 152.33 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 983.00 180.25 188.17 244.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,512.20 119.03 134.67 155.97 =============== 202-00700 Rem Light Standard Each =================================================== STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 16.00 400.00 118.72 110.00 SRP083A-032 HIGHWAY 83 AND HODGEN IN EL P 03/20/08 2.00 375.00 530.63 130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 18.00 397.22 201.10 112.22 NH 0503-064 US 50:15TH AND 16TH ST IN CAN 04/17/08 1.00 450.00 174.49 180.00 IM 070A-003 I 70 BETWEEN DENVER AND VAIL 06/12/08 2.00 6.00 762.00 1300.00 STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 3.00 220.00 821.86 820.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 187.00 757.69 873.33 STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 3.00 353.00 845.89 1040.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 353.00 845.89 1040.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 27.00 345.59 441.58 384.44 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 31 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00725 Rem Ex Lighting Sys LUMP SUM =============================================== C0703-330 I-70 TWIN TUNNELS WESTBOUND 06/12/08 1.00 20000.00 23340.33 36600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 20000.00 23340.33 36600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 20000.00 23340.33 36600.00 =============== 202-00750 Rem Luminaire Each =================================================== C0703-330 I-70 TWIN TUNNELS WESTBOUND 06/12/08 222.00 75.00 137.76 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 222.00 75.00 137.76 200.00 SHE0831-102 PARKER RD: LONG AVE INTERSECT 07/24/08 1.00 300.00 179.80 240.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 300.00 179.80 240.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 223.00 76.01 138.22 200.18 =============== 202-00805 Rem Overhead Sign Str Each =================================================== IM0703-327 I-70 SILVERTHORNE TO EJMT 03/20/08 1.00 3700.00 2668.74 2235.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 3700.00 2668.74 2235.00 STA0831-106 PARKER RD. (SH 83) MP 65.5 TO 07/10/08 1.00 4000.00 3884.88 1966.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 4000.00 3884.88 1966.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 3850.00 3276.81 2100.50 =============== 202-00810 Rem Ground Sign Each =================================================== NH 0821-085 SH82 EAGLE COUNTY 01/03/08 4.00 85.00 76.50 93.00 HB131A-033 SH 131 ROUTT COUNTY 01/10/08 1.00 85.00 84.25 150.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 32 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00810 Rem Ground Sign Each =================================================== NH0853-066 US 85C SH 60 TO LASALLE 01/10/08 14.00 55.00 88.09 75.00 STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 81.00 50.00 60.73 56.00 STA 093A-007 ON SH 93 IN BOULDER COUNTY 01/24/08 42.00 70.00 48.59 46.90 CCR600-303 CHATFIELD STATE PARK MAIN RD, 01/31/08 15.00 30.00 102.84 80.70 SHE 050A-007 SH 50 BETWEEN MORRIS/FORTINO 01/31/08 19.00 55.00 102.50 50.00 CM240-112 COLORADO SPRINGS - VARIOUS LO 02/07/08 324.00 41.00 45.53 36.58 STA 391A-003 KIPLING: 6TH AVE TO COLFAX 02/14/08 1.00 70.00 110.72 100.26 SHE0741-016 THE INTERSECTION OF SH 74 AND 02/14/08 4.00 87.00 69.00 110.00 STA 079A-011 SH40 / SH79, SH40 (309.26-31 02/28/08 3.00 88.00 57.72 54.22 SHE0702-276 EAGLE COUNTY I-70 MP 171 TO M 03/13/08 10.00 55.00 76.67 75.00 STA 072A-030 SH 72, 64TH AVE TO 84TH PKWY 03/13/08 1.00 100.00 88.78 25.50 IM0703-327 I-70 SILVERTHORNE TO EJMT 03/20/08 2.00 123.00 139.72 150.50 SRP083A-032 HIGHWAY 83 AND HODGEN IN EL P 03/20/08 4.00 50.00 78.00 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 525.00 47.13 57.96 45.73 NH 2871-031 US 287 SOUTH OF LAMAR FROM MP 04/03/08 53.00 70.00 72.64 71.89 C 1191-023 FROM MP 0.0 TO MP 2.6 GILPIN 04/03/08 16.00 78.00 110.21 88.00 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 71.00 51.00 224.58 265.00 SHE 0501-056 US 50 AND 28.5 RD IN GRAND JU 04/10/08 10.00 70.00 54.48 100.00 NH 0503-064 US 50:15TH AND 16TH ST IN CAN 04/17/08 24.00 90.00 121.03 120.00 NH0504-056 US 50 PASSING LANES EAST OF 5 05/15/08 10.00 50.00 105.29 75.00 STS 1151-021 SH 115 AT CR F45 IN FREMONT C 05/15/08 6.00 100.00 170.32 185.00 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 19.00 60.00 75.33 85.00 IM 070A-003 I 70 BETWEEN DENVER AND VAIL 06/12/08 25.00 90.00 84.00 65.00 STA 069A-023 SH 69 WESTCLIFFE AREA - CUSTE 06/26/08 5.00 100.00 118.18 100.00 STA086A-048 INTERSECTION OF SH 86 & COUNT 06/26/08 4.00 75.00 64.25 65.00 STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 78.00 55.00 54.49 51.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 321.00 65.48 122.81 117.67 CR 600-275 I-70 VIADUCT - COLO. TO BRIGH 07/10/08 13.00 50.00 109.00 192.00 STA0831-106 PARKER RD. (SH 83) MP 65.5 TO 07/10/08 5.00 110.00 90.76 85.70 SHE 070A-005 I-70 B FROM PATTERSON (F RD.) 07/17/08 6.00 84.54 77.60 53.00 STA 0404-044 WEST COLFAX AVE. (US 40) FROM 07/17/08 4.00 98.00 91.27 46.34 STA R400-147 ON SH 52 IN MORGAN COUNTY 07/24/08 2.00 150.00 137.97 250.00 SHE0831-102 PARKER RD: LONG AVE INTERSECT 07/24/08 10.00 55.00 64.73 132.00 NH 2854-109 US 285: DEER CREEK INTERCHANG 07/31/08 35.00 65.00 52.13 47.00 SHE R600-310 US285/FED, I-25/120TH, I-270/ 08/14/08 2.00 115.00 215.53 107.66 STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 6.00 54.00 94.71 53.00 C0702-284 I-70 TRUCK PARKING AT DOTSERO 09/11/08 1.00 1500.00 3351.96 2315.79 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 84.00 86.65 110.81 115.98 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 33 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00810 Rem Ground Sign Each =================================================== C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 31.00 75.00 48.34 25.00 BRS120A-008 ON SH 120 AT MP 2.76 IN FREMO 10/09/08 15.00 50.00 51.95 59.19 BR 0361-088 US36 AND CHERRYVALE RD 10/16/08 6.00 46.00 82.94 50.00 NH 1602-117 THIS PROJECT IS LOCATED ABOUT 12/04/08 3.00 40.00 81.08 53.00 SHE 0451-009 SH45 (PUEBLO BLVD) AND RED CR 12/04/08 2.00 100.00 123.60 40.00 C1601-057 ON U.S. 160, APPROXIMATELY M. 12/04/08 11.00 110.00 163.48 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 68.00 71.78 65.97 48.56 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 998.00 58.04 89.47 74.97 =============== 202-00815 Rem of Sign (Special) Each =================================================== CM240-112 COLORADO SPRINGS - VARIOUS LO 02/07/08 1.00 1500.00 778.78 611.34 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1500.00 778.78 611.34 STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 3.00 231.00 584.86 127.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 231.00 584.86 127.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 548.25 609.10 248.09 =============== 202-00821 Rem Sign Panel Each =================================================== STA139A-029 N OF DOUGLAS PASS CHIP SEALS 01/03/08 1.00 35.00 178.11 419.43 NH0853-066 US 85C SH 60 TO LASALLE 01/10/08 8.00 26.00 50.86 50.00 STA 093A-007 ON SH 93 IN BOULDER COUNTY 01/24/08 7.00 30.00 41.36 20.80 CM240-112 COLORADO SPRINGS - VARIOUS LO 02/07/08 92.00 57.00 30.76 22.29 IM 0252-386 I-25: RESURFACE 23RD TO 48TH 02/14/08 17.00 25.00 61.55 54.00 STA 391A-003 KIPLING: 6TH AVE TO COLFAX 02/14/08 11.00 40.00 77.56 79.15 NH 0404-046 COLFAX AVE: ARAPAHOE/ADAMS CO 02/28/08 5.00 50.00 53.98 78.00 STA 002A-001 COLO. BLVD(SH 2A): MEXICO TO 02/28/08 5.00 50.00 115.15 162.40 SHE0702-276 EAGLE COUNTY I-70 MP 171 TO M 03/13/08 2.00 55.00 376.67 1000.00 STA 072A-030 SH 72, 64TH AVE TO 84TH PKWY 03/13/08 8.00 20.00 57.17 25.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 156.00 47.00 54.16 52.63 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 34 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00821 Rem Sign Panel Each =================================================== C 1191-023 FROM MP 0.0 TO MP 2.6 GILPIN 04/03/08 1.00 82.00 331.22 53.00 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 3.00 55.00 270.94 325.00 STA 009A-001 SH 9 HOOSIER PASS NORTH - PHA 05/01/08 2.00 72.00 119.25 100.00 STA009A-025 SH9 FROM FAIRPLAY TO HARTSEL 05/01/08 1.00 94.00 82.42 80.25 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 3.00 30.00 55.00 34.00 IM 070A-003 I 70 BETWEEN DENVER AND VAIL 06/12/08 1.00 70.00 156.00 210.00 STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 2.00 60.00 21.85 20.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 13.00 58.85 162.64 127.79 SHE 070A-005 I-70 B FROM PATTERSON (F RD.) 07/17/08 8.00 29.84 52.90 26.50 SHE0831-102 PARKER RD: LONG AVE INTERSECT 07/24/08 6.00 25.00 50.80 80.00 STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 1.00 93.00 84.50 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 15.00 32.11 54.95 47.53 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 73.00 50.00 33.93 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 73.00 50.00 33.93 25.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 257.00 47.58 49.13 48.29 =============== 202-00825 Rem Flashing Beacon Each =================================================== NH 2854-109 US 285: DEER CREEK INTERCHANG 07/31/08 2.00 266.00 314.78 135.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 266.00 314.78 135.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 266.00 314.78 135.00 =============== 202-00827 Rem of Pull Box Each =================================================== STA 002A-001 COLO. BLVD(SH 2A): MEXICO TO 02/28/08 4.00 75.00 61.25 54.13 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 75.00 61.25 54.13 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 35 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00827 Rem of Pull Box Each =================================================== C119A-054 SH 119 FROM MP 6.5 TO MP 8.0 06/19/08 1.00 150.00 185.17 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 150.00 185.17 90.00 SHE 0451-009 SH45 (PUEBLO BLVD) AND RED CR 12/04/08 4.00 120.00 73.00 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 120.00 73.00 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 103.33 79.37 56.28 =============== 202-00828 Rem Traf Sig Equipment LUMP SUM =============================================== STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 1.00 10000.00 3870.02 3600.00 STA2873-148 FEDRERAL BLVD (SH 287) AT 70T 02/07/08 1.00 2500.00 4981.43 4460.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 6250.00 4487.47 4030.00 SHE 2854-114 SH 285-BRADEY CT. 05/01/08 1.00 1500.00 4780.69 1500.00 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 1.00 6000.00 6266.67 6500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 4875.00 5616.55 5250.00 STA0831-106 PARKER RD. (SH 83) MP 65.5 TO 07/10/08 1.00 6500.00 2030.11 1419.90 NH 2854-109 US 285: DEER CREEK INTERCHANG 07/31/08 1.00 5500.00 3742.92 6000.00 STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 1.00 5000.00 6033.75 6785.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 5666.67 3854.03 4734.97 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 5444.44 4591.02 4807.21 =============== 202-00840 Rem Traf Sig Pole Each =================================================== IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 1.00 715.00 1957.00 1400.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 36 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00840 Rem Traf Sig Pole Each =================================================== NH 0503-064 US 50:15TH AND 16TH ST IN CAN 04/17/08 6.00 1300.00 597.32 600.00 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 12.00 1250.00 1466.67 1500.00 STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 10.00 1100.00 1517.99 1537.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 29.00 1190.17 1423.43 1323.28 SHE0831-102 PARKER RD: LONG AVE INTERSECT 07/24/08 1.00 2000.00 894.00 925.00 STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 1.00 678.00 1468.61 1695.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 1339.00 1229.19 1310.00 STA0853-069 US 85 & COLLINS ST (EATON) 12/04/08 2.00 1500.00 1009.63 186.00 SHE 0451-009 SH45 (PUEBLO BLVD) AND RED CR 12/04/08 4.00 1500.00 480.60 425.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 1500.00 731.20 345.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 37.00 1248.46 1282.36 1163.97 =============== 202-00842 Rem Mast Arm Each =================================================== SHE0831-102 PARKER RD: LONG AVE INTERSECT 07/24/08 1.00 500.00 523.20 685.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 500.00 523.20 685.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 500.00 523.20 685.00 =============== 202-00848 Rem Traf Sig Control+Cab Each =================================================== NH 0503-064 US 50:15TH AND 16TH ST IN CAN 04/17/08 1.00 500.00 645.78 700.00 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 1.00 300.00 553.33 560.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 400.00 599.56 630.00 STA0853-069 US 85 & COLLINS ST (EATON) 12/04/08 1.00 500.00 928.66 653.00 SHE 0451-009 SH45 (PUEBLO BLVD) AND RED CR 12/04/08 1.00 700.00 385.80 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 600.00 734.78 476.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 500.00 694.22 553.25 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 37 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00855 Rem Traf Sig Control Cab Each =================================================== STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 1.00 750.00 1459.66 1537.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 750.00 1459.66 1537.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 750.00 1459.66 1537.50 =============== 202-00858 Rem Pedestal Pole Each =================================================== STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 2.00 50.00 503.92 512.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 50.00 503.92 512.50 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 1.00 100.00 430.95 200.00 BR 0361-088 US36 AND CHERRYVALE RD 10/16/08 1.00 100.00 416.48 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 100.00 425.32 225.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 75.00 464.62 368.75 =============== 202-00895 Rem of Impact Attenuator Each =================================================== IM0252-393 DENVER - I-25 FROM SANTA FE D 02/28/08 2.00 1500.00 2293.79 2060.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1500.00 2293.79 2060.10 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 1.00 1100.00 1231.72 850.00 STA0703-334 I-70 FROM BAKERVILLE TO EAST 05/15/08 1.00 1400.00 1085.00 2975.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 1250.00 1179.32 1912.50 CR 600-275 I-70 VIADUCT - COLO. TO BRIGH 07/10/08 3.00 2000.00 1636.67 1910.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 2000.00 1636.67 1910.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 1642.86 1599.70 1953.60 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 38 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01000 Rem Fence Lin Foot =============================================== HB131A-033 SH 131 ROUTT COUNTY 01/10/08 18,819.00 1.30 0.76 0.75 STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 4,550.00 1.00 0.87 0.80 STA 0831-099 SH 83 AT RUSSELLVILLE ROAD SO 01/17/08 2,101.00 1.75 0.68 0.40 NH0342-048 US 34 IN WELD COUNTY 02/07/08 33,096.00 0.20 0.50 0.38 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 58,566.00 0.67 0.65 0.53 NH 2871-031 US 287 SOUTH OF LAMAR FROM MP 04/03/08 111,230.00 0.20 0.32 0.31 C 1191-023 FROM MP 0.0 TO MP 2.6 GILPIN 04/03/08 1,086.00 1.65 4.96 1.65 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 1,720.00 1.45 0.92 1.00 NH5501-013 US 550 N OF NM STATE LINE, MP 04/10/08 11,631.00 1.00 0.99 1.30 C 067A-026 SH67 AND CR81 04/10/08 3,070.00 1.00 1.06 1.00 NH 0503-064 US 50:15TH AND 16TH ST IN CAN 04/17/08 35.00 8.00 14.75 10.00 NH0504-056 US 50 PASSING LANES EAST OF 5 05/15/08 29,190.00 0.50 0.53 0.40 C 1601-060 US 160 MONTEZUMA COUNTY 06/26/08 450.00 0.50 4.38 2.00 STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 6,876.00 0.50 0.86 0.34 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 165,288.00 0.36 0.59 0.43 CR 600-275 I-70 VIADUCT - COLO. TO BRIGH 07/10/08 245.00 2.00 8.00 11.00 STA0831-106 PARKER RD. (SH 83) MP 65.5 TO 07/10/08 1,396.00 1.75 25.61 49.00 STA R400-147 ON SH 52 IN MORGAN COUNTY 07/24/08 5,895.00 0.50 0.74 0.65 NH 2854-109 US 285: DEER CREEK INTERCHANG 07/31/08 360.00 2.90 1.58 0.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7,896.00 0.88 4.64 9.53 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 19,590.00 0.60 0.60 0.30 BRS120A-008 ON SH 120 AT MP 2.76 IN FREMO 10/09/08 1,660.00 1.00 0.77 0.53 BR 0361-088 US36 AND CHERRYVALE RD 10/16/08 613.00 2.00 1.68 0.80 C1601-057 ON U.S. 160, APPROXIMATELY M. 12/04/08 3,865.00 2.00 1.46 1.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 25,728.00 0.87 0.70 0.54 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 257,478.00 0.50 0.86 0.74 =============== 202-01010 Rem Silt Fence Lin Foot =============================================== NHC040-027 POWERS BLVD - FROM WOODMEN RO 08/21/08 750.00 1.00 1.72 0.83 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 750.00 1.00 1.72 0.83 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 750.00 1.00 1.72 0.83 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 39 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01030 Rem of Road Closure Gate Each =================================================== IM 0705-077 I70 WEST OF BURLINGTON EAST I 04/17/08 9.00 362.00 472.76 328.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 9.00 362.00 472.76 328.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.00 362.00 472.76 328.78 =============== 202-01110 Rem Gdrail Ty 1 Lin Foot =============================================== STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 625.00 5.00 2.61 3.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 625.00 5.00 2.61 3.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 625.00 5.00 2.61 3.50 =============== 202-01130 Rem Gdrail Ty 3 Lin Foot =============================================== STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 1,726.00 3.00 2.28 2.20 IM0701-189 PALISADE EAST 01/17/08 35,288.00 1.80 1.61 1.50 NH0342-043 ON US 34 IN WELD COUNTY 01/24/08 152.00 3.69 3.51 4.00 STA 093A-007 ON SH 93 IN BOULDER COUNTY 01/24/08 5,559.00 2.75 2.13 1.65 C0253-199 I25 RUBBILIZATION N OF SH 56 01/24/08 15,856.00 3.00 2.28 2.10 CCR600-303 CHATFIELD STATE PARK MAIN RD, 01/31/08 604.00 3.00 2.50 2.15 NH0342-048 US 34 IN WELD COUNTY 02/07/08 456.00 5.00 3.77 3.75 HB 0131-050 SH 13 NORTH OF RIFLE 02/07/08 600.00 4.50 2.71 4.00 SHE0741-016 THE INTERSECTION OF SH 74 AND 02/14/08 200.00 6.50 7.80 5.00 STA0252-397 I25 NORTHGATE NORTH 02/14/08 14,400.00 3.00 2.21 1.79 NH 0404-046 COLFAX AVE: ARAPAHOE/ADAMS CO 02/28/08 946.00 4.00 2.89 2.95 IM0252-393 DENVER - I-25 FROM SANTA FE D 02/28/08 1,908.00 3.00 4.13 3.15 STU 0251-329 S OF COLORADO CITY TO CEDARWO 03/06/08 12,962.00 2.00 1.80 1.62 IM0703-327 I-70 SILVERTHORNE TO EJMT 03/20/08 2,453.00 4.00 2.87 4.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 93,110.00 2.46 2.00 1.85 NH 2871-031 US 287 SOUTH OF LAMAR FROM MP 04/03/08 1,350.00 3.00 2.28 2.16 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 15,091.00 1.70 1.91 2.00 NH5501-013 US 550 N OF NM STATE LINE, MP 04/10/08 871.00 3.50 2.51 2.00 IM 0705-077 I70 WEST OF BURLINGTON EAST I 04/17/08 4,442.00 2.95 2.32 2.19 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 1,537.00 3.00 2.15 2.90 C0703-330 I-70 TWIN TUNNELS WESTBOUND 06/12/08 60.00 10.00 9.81 14.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 40 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01130 Rem Gdrail Ty 3 Lin Foot =============================================== C119A-054 SH 119 FROM MP 6.5 TO MP 8.0 06/19/08 84.00 8.00 5.55 5.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 23,435.00 2.21 2.01 2.15 CR 600-275 I-70 VIADUCT - COLO. TO BRIGH 07/10/08 11,984.00 3.94 6.87 7.79 STA0831-106 PARKER RD. (SH 83) MP 65.5 TO 07/10/08 257.00 6.25 5.88 3.70 STA 0404-044 WEST COLFAX AVE. (US 40) FROM 07/17/08 1,265.00 3.75 2.11 1.75 NH 2854-109 US 285: DEER CREEK INTERCHANG 07/31/08 774.00 4.00 2.86 2.35 STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 113.00 6.25 11.84 8.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 14,393.00 3.99 5.66 6.90 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 215.00 6.00 2.69 2.80 BR 0361-088 US36 AND CHERRYVALE RD 10/16/08 510.00 3.00 3.34 3.05 SHE 0821-082 SH 82/SMITH WAY - PITKIN 10/16/08 1,065.00 7.00 2.40 2.61 NH 1602-117 THIS PROJECT IS LOCATED ABOUT 12/04/08 227.00 2.50 6.32 9.00 C1601-057 ON U.S. 160, APPROXIMATELY M. 12/04/08 1,154.00 3.00 2.74 2.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,171.00 4.51 2.95 3.18 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 134,109.00 2.63 2.33 2.47 =============== 202-01135 Rem Gdrail Thrie Beam Lin Foot =============================================== C0253-199 I25 RUBBILIZATION N OF SH 56 01/24/08 599.00 5.00 3.97 3.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 599.00 5.00 3.97 3.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 599.00 5.00 3.97 3.45 =============== 202-01140 Rem Gdrail Ty 4 Lin Foot =============================================== STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 499.00 20.00 11.38 14.00 IM0701-189 PALISADE EAST 01/17/08 12,075.00 16.50 33.28 15.50 HB 0131-050 SH 13 NORTH OF RIFLE 02/07/08 600.00 11.00 9.04 5.00 IM 0252-386 I-25: RESURFACE 23RD TO 48TH 02/14/08 10.00 50.00 101.20 110.00 C 0253-202 I-25 02/15/08 1,555.00 20.00 30.00 30.00 IM0252-393 DENVER - I-25 FROM SANTA FE D 02/28/08 7,940.00 13.00 24.43 17.30 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 41 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01140 Rem Gdrail Ty 4 Lin Foot =============================================== SHE0702-276 EAGLE COUNTY I-70 MP 171 TO M 03/13/08 15,810.00 18.00 31.33 44.00 IM0703-327 I-70 SILVERTHORNE TO EJMT 03/20/08 590.00 12.50 17.20 12.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 39,079.00 16.44 29.44 27.77 HB0403-052 US40 BERTHOUD PASS 04/24/08 130.00 9.00 21.51 20.00 C0703-337 I-70 EMPIRE JCT. EAST OVERLAY 06/05/08 4,580.00 13.25 16.92 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4,710.00 13.13 17.08 18.06 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 3,052.00 20.00 7.57 4.87 BR 0361-088 US36 AND CHERRYVALE RD 10/16/08 230.00 17.00 16.44 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,282.00 19.79 7.97 5.58 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 47,071.00 16.35 24.80 25.25 =============== 202-01170 Rem Gdrail Ty 7 Lin Foot =============================================== IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 61.00 19.50 22.17 9.00 C0703-330 I-70 TWIN TUNNELS WESTBOUND 06/12/08 34.00 20.00 199.61 180.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 95.00 19.68 41.73 70.20 STA0831-106 PARKER RD. (SH 83) MP 65.5 TO 07/10/08 12.00 78.00 43.79 21.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.00 78.00 43.79 21.60 BR 0361-088 US36 AND CHERRYVALE RD 10/16/08 58.00 10.00 25.00 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 58.00 10.00 25.00 15.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 165.00 20.52 35.84 47.26 =============== 202-01200 Rem Tensioned Cable Barrier Lin Foot =============================================== C0253-199 I25 RUBBILIZATION N OF SH 56 01/24/08 3,485.00 3.50 2.47 1.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,485.00 3.50 2.47 1.70 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 42 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01200 Rem Tensioned Cable Barrier Lin Foot =============================================== IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 8,050.00 1.55 2.29 1.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8,050.00 1.55 2.29 1.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,535.00 2.14 2.31 1.56 =============== 202-01300 Rem End Anchorage Each =================================================== NH 0821-085 SH82 EAGLE COUNTY 01/03/08 4.00 200.00 307.00 264.00 STA133A-034 133/187 RESURFACING 01/03/08 2.00 175.00 146.00 150.00 STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 15.00 160.00 110.75 150.00 NH0342-043 ON US 34 IN WELD COUNTY 01/24/08 4.00 150.00 152.88 200.00 STA 093A-007 ON SH 93 IN BOULDER COUNTY 01/24/08 22.00 125.00 119.85 105.00 C0253-199 I25 RUBBILIZATION N OF SH 56 01/24/08 31.00 120.00 150.73 77.20 NH 2851-004 US 285 RESURFACE FROM NEW MEX 02/07/08 4.00 160.00 126.32 110.27 HB 0131-050 SH 13 NORTH OF RIFLE 02/07/08 2.00 300.00 255.83 200.00 IM 0252-386 I-25: RESURFACE 23RD TO 48TH 02/14/08 1.00 200.00 346.23 270.00 STA0252-397 I25 NORTHGATE NORTH 02/14/08 73.00 150.00 100.66 79.97 NH 0404-046 COLFAX AVE: ARAPAHOE/ADAMS CO 02/28/08 10.00 300.00 136.88 118.50 STU 0251-329 S OF COLORADO CITY TO CEDARWO 03/06/08 45.00 135.00 92.22 81.09 SHE0702-276 EAGLE COUNTY I-70 MP 171 TO M 03/13/08 7.00 200.00 165.00 180.00 IM0703-327 I-70 SILVERTHORNE TO EJMT 03/20/08 6.00 180.00 99.69 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 226.00 152.94 118.04 100.14 NH 2871-031 US 287 SOUTH OF LAMAR FROM MP 04/03/08 12.00 150.00 95.44 92.43 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 15.00 190.00 145.97 100.00 NH5501-013 US 550 N OF NM STATE LINE, MP 04/10/08 6.00 200.00 137.76 125.00 C 067A-026 SH67 AND CR81 04/10/08 2.00 200.00 190.60 150.00 IM 0705-077 I70 WEST OF BURLINGTON EAST I 04/17/08 12.00 225.00 113.00 118.36 STA0703-334 I-70 FROM BAKERVILLE TO EAST 05/15/08 1.00 229.00 179.00 145.00 C0703-337 I-70 EMPIRE JCT. EAST OVERLAY 06/05/08 1.00 235.00 162.67 160.00 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 8.00 200.00 183.33 250.00 C0703-330 I-70 TWIN TUNNELS WESTBOUND 06/12/08 1.00 200.00 188.09 130.00 C119A-054 SH 119 FROM MP 6.5 TO MP 8.0 06/19/08 1.00 500.00 164.17 165.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 59.00 198.54 138.59 130.16 STA0831-106 PARKER RD. (SH 83) MP 65.5 TO 07/10/08 4.00 217.00 169.39 202.10 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 43 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01300 Rem End Anchorage Each =================================================== STA 0404-044 WEST COLFAX AVE. (US 40) FROM 07/17/08 2.00 306.00 152.23 149.31 NH 2854-109 US 285: DEER CREEK INTERCHANG 07/31/08 2.00 263.00 170.62 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 250.75 165.06 175.88 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 4.00 160.00 136.07 115.00 BR 0361-088 US36 AND CHERRYVALE RD 10/16/08 8.00 120.00 174.49 110.00 SHE 0821-082 SH 82/SMITH WAY - PITKIN 10/16/08 3.00 250.00 150.72 132.89 NH 1602-117 THIS PROJECT IS LOCATED ABOUT 12/04/08 2.00 150.00 174.92 120.00 C1601-057 ON U.S. 160, APPROXIMATELY M. 12/04/08 8.00 150.00 91.93 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 25.00 154.00 139.16 111.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 318.00 163.95 126.71 108.48 =============== 202-04001 Plug Culvert Each =================================================== NH0504-056 US 50 PASSING LANES EAST OF 5 05/15/08 1.00 2000.00 1036.43 400.00 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 51.00 600.00 2900.00 3200.00 C 1601-060 US 160 MONTEZUMA COUNTY 06/26/08 1.00 15000.00 34928.00 26000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 53.00 898.11 3791.48 3577.36 NH 2854-109 US 285: DEER CREEK INTERCHANG 07/31/08 1.00 685.00 953.39 700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 685.00 953.39 700.00 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 2.00 1000.00 993.90 1839.06 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 1000.00 993.90 1839.06 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 56.00 897.95 3384.36 3463.90 =============== 202-04002 Clean Culvert Each =================================================== NH0853-066 US 85C SH 60 TO LASALLE 01/10/08 23.00 1000.00 1437.24 1150.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 44 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-04002 Clean Culvert Each =================================================== CCR600-303 CHATFIELD STATE PARK MAIN RD, 01/31/08 1.00 1000.00 2112.17 1935.00 SHE0741-016 THE INTERSECTION OF SH 74 AND 02/14/08 1.00 1800.00 3261.00 4000.00 STA0252-397 I25 NORTHGATE NORTH 02/14/08 4.00 2500.00 3220.51 2161.54 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 29.00 1234.48 1651.94 1414.87 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 1.00 1700.00 8214.34 30000.00 C 067A-026 SH67 AND CR81 04/10/08 1.00 1200.00 2659.05 4000.00 IM 0705-077 I70 WEST OF BURLINGTON EAST I 04/17/08 14.00 1300.00 2841.19 2250.93 STA009A-025 SH9 FROM FAIRPLAY TO HARTSEL 05/01/08 20.00 899.00 1389.67 1400.00 NH0504-056 US 50 PASSING LANES EAST OF 5 05/15/08 5.00 3500.00 1556.14 350.00 STA0703-334 I-70 FROM BAKERVILLE TO EAST 05/15/08 1.00 2000.00 3550.80 1904.00 SHE 0761-195 I-76: BURLINGTON CANAL TO BRO 05/15/08 18.00 1100.00 1372.41 1800.00 C0703-337 I-70 EMPIRE JCT. EAST OVERLAY 06/05/08 2.00 2000.00 4311.67 4200.00 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 2.00 1000.00 4608.33 10000.00 STA 069A-023 SH 69 WESTCLIFFE AREA - CUSTE 06/26/08 1.00 2500.00 1486.20 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 65.00 1336.62 2106.40 2445.65 NH 2854-109 US 285: DEER CREEK INTERCHANG 07/31/08 3.00 2200.00 2442.73 3000.00 STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 3.00 869.00 1831.82 905.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 1534.50 2113.78 1952.50 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 2.00 2000.00 1537.49 1359.20 NH1601-058 ON US 160, FROM M.P. 21.40 TO 10/09/08 5.00 1400.00 1733.80 5000.00 BR 0361-088 US36 AND CHERRYVALE RD 10/16/08 1.00 1100.00 1639.54 1200.00 C1601-057 ON U.S. 160, APPROXIMATELY M. 12/04/08 19.00 900.00 1680.56 1900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 27.00 1081.48 1668.04 2408.09 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 127.00 1268.40 1889.97 2178.99 =============== 202-04003 Clean Culvert (Spec) Each =================================================== IM 0252-386 I-25: RESURFACE 23RD TO 48TH 02/14/08 69.00 500.00 225.36 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 69.00 500.00 225.36 120.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 45 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-04003 Clean Culvert (Spec) Each =================================================== STA 0404-044 WEST COLFAX AVE. (US 40) FROM 07/17/08 12.00 440.00 1254.58 1235.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.00 440.00 1254.58 1235.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 81.00 491.11 449.40 285.28 =============== 202-04004 Plug Culvert (Spec) Each =================================================== STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 1.00 10000.00 10470.61 2400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 10000.00 10470.61 2400.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 10000.00 10470.61 2400.00 =============== 202-04005 Clean Valve Box Each =================================================== STA 391A-003 KIPLING: 6TH AVE TO COLFAX 02/14/08 14.00 160.00 159.76 63.32 NH0405-032 COLFAX AVENUE FROM COLORADO 02/28/08 45.00 150.00 109.78 43.45 NH 0404-046 COLFAX AVE: ARAPAHOE/ADAMS CO 02/28/08 13.00 120.00 124.70 57.40 STA 002A-001 COLO. BLVD(SH 2A): MEXICO TO 02/28/08 53.00 100.00 96.44 59.55 STA 072A-030 SH 72, 64TH AVE TO 84TH PKWY 03/13/08 6.00 150.00 144.64 112.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 131.00 127.86 112.82 56.61 NH 030A-026 SH30 1ST AVE AT HAVANA ST TO 04/17/08 30.00 150.00 139.53 90.08 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 30.00 150.00 139.53 90.08 STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 16.00 105.00 259.64 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 16.00 105.00 259.64 350.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 177.00 129.55 129.59 88.80 =============== 202-04100 Abandon Well Each =================================================== NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 1.00 1200.00 3816.67 3500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 1200.00 3816.67 3500.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 46 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-04100 Abandon Well Each =================================================== STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 1.00 1600.00 2258.39 3100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1600.00 2258.39 3100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1400.00 2725.88 3300.00 =============== 202-04300 Rem Underground Storage Tank Each =================================================== NH5501-013 US 550 N OF NM STATE LINE, MP 04/10/08 2.00 10000.00 15719.59 7800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 10000.00 15719.59 7800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 10000.00 15719.59 7800.00 =============== 202-05008 Sawing Concrete (8 In) Lin Foot =============================================== IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 7,839.00 1.00 2.92 2.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7,839.00 1.00 2.92 2.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,839.00 1.00 2.92 2.75 =============== 202-05010 Sawing Concrete (10 In) Lin Foot =============================================== NH 160A-002 DOUBLE TREE BRIDGE ( O-05-AJ) 01/17/08 135.00 35.00 31.00 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 135.00 35.00 31.00 35.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 135.00 35.00 31.00 35.00 =============== 202-05019 Sawing Concrete (Spec) Lin Foot =============================================== C 0253-202 I-25 02/15/08 1,000.00 12.00 15.00 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,000.00 12.00 15.00 15.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,000.00 12.00 15.00 15.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 47 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-05026 Sawing Asphalt Mat (6 In) Lin Foot =============================================== HB131A-033 SH 131 ROUTT COUNTY 01/10/08 64.00 2.50 16.70 2.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 64.00 2.50 16.70 2.50 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 16,614.00 0.35 0.99 0.75 NH0504-056 US 50 PASSING LANES EAST OF 5 05/15/08 29,990.00 2.50 0.81 1.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 46,604.00 1.73 0.89 0.91 SHE 070A-005 I-70 B FROM PATTERSON (F RD.) 07/17/08 900.00 2.30 6.89 5.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 900.00 2.30 6.89 5.30 SHE 0821-082 SH 82/SMITH WAY - PITKIN 10/16/08 2,288.00 3.00 2.23 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,288.00 3.00 2.23 2.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 49,856.00 1.80 1.01 1.04 =============== 202-05030 Sawing Asphalt Mat (10 In) Lin Foot =============================================== SHE 050A-007 SH 50 BETWEEN MORRIS/FORTINO 01/31/08 8,296.00 1.00 4.01 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8,296.00 1.00 4.01 3.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,296.00 1.00 4.01 3.00 =============== 202-05100 Sandblasting Reinf Steel Sq Yard ================================================ NH 160A-002 DOUBLE TREE BRIDGE ( O-05-AJ) 01/17/08 34.00 70.00 106.00 40.00 NH 2851-004 US 285 RESURFACE FROM NEW MEX 02/07/08 75.00 25.00 11.73 10.40 IM0703-327 I-70 SILVERTHORNE TO EJMT 03/20/08 71.00 23.00 44.48 42.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 180.00 32.71 38.45 28.65 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 48 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-05100 Sandblasting Reinf Steel Sq Yard ================================================ C0703-337 I-70 EMPIRE JCT. EAST OVERLAY 06/05/08 629.00 34.00 7.58 7.50 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 23.00 10.00 63.00 115.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 652.00 33.15 9.54 11.29 BR R400-206 VARIOUS LOCATIONS IN REGION 4 09/11/08 96.00 30.00 18.41 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 96.00 30.00 18.41 8.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 928.00 32.74 18.81 14.32 =============== 202-05150 Sandblasting Sq Foot ================================================ NH 2851-004 US 285 RESURFACE FROM NEW MEX 02/07/08 48.00 10.00 18.29 16.64 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 48.00 10.00 18.29 16.64 NH 2871-031 US 287 SOUTH OF LAMAR FROM MP 04/03/08 94,960.00 0.25 0.35 0.26 IM 0704-207 I-70 FROM I-225 TO TOWER RD 04/17/08 5,000.00 1.00 0.74 0.71 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 3,089.00 0.51 1.62 2.20 STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 61,740.00 0.50 0.44 0.36 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 164,789.00 0.37 0.43 0.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 164,837.00 0.37 0.43 0.35 =============== 202-05300 Rem and Disposal of Paint LUMP SUM =============================================== C0063-027 US 6 LOMA STR H-01-E, MP 13.1 12/11/08 1.00 5000.00 3512.96 680.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 5000.00 3512.96 680.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5000.00 3512.96 680.00 =============== 202-06000 Rem Detour LUMP SUM =============================================== STA R400-147 ON SH 52 IN MORGAN COUNTY 07/24/08 1.00 10000.00 29828.00 11000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 10000.00 29828.00 11000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 10000.00 29828.00 11000.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 49 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-06520 Rem of Existing Wall Panels LUMP SUM =============================================== IM 0703-322 I-70 MM 213-215 04/03/08 1.00 400000.00 720000.00 640000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 400000.00 720000.00 640000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 400000.00 720000.00 640000.00 =============== 202-06530 Clean Drain Pipe (Spec) Each =================================================== IM0252-393 DENVER - I-25 FROM SANTA FE D 02/28/08 40.00 25.00 119.94 69.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 40.00 25.00 119.94 69.55 NHC040-027 POWERS BLVD - FROM WOODMEN RO 08/21/08 1.00 3000.00 2209.95 860.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 3000.00 2209.95 860.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 41.00 97.56 195.48 88.83 =============== 203-00000 Uncl Excav Cubic Yard ============================================= NH 160A-002 DOUBLE TREE BRIDGE ( O-05-AJ) 01/17/08 3.00 100.00 197.50 70.00 HB 0131-050 SH 13 NORTH OF RIFLE 02/07/08 10,910.00 15.00 23.08 10.00 STA0252-397 I25 NORTHGATE NORTH 02/14/08 7,609.00 12.00 9.05 12.14 IM0703-327 I-70 SILVERTHORNE TO EJMT 03/20/08 182.00 27.00 38.69 27.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 18,704.00 13.91 19.78 11.05 C 1191-023 FROM MP 0.0 TO MP 2.6 GILPIN 04/03/08 2,364.00 12.50 30.63 50.00 STA 0343-026 ON US 34 IN YUMA COUNTY 04/17/08 8,676.00 8.50 18.23 18.00 IM 0702-281 I-70 IN DOWD CANYON 04/30/08 4,300.00 27.50 66.20 82.80 C 1601-060 US 160 MONTEZUMA COUNTY 06/26/08 940.00 30.00 26.35 8.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16,280.00 15.34 34.80 39.23 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 34,984.00 14.58 26.06 24.16 =============== 203-00010 Uncl Excav (CIP) Cubic Yard ============================================= HB131A-033 SH 131 ROUTT COUNTY 01/10/08 55,220.00 14.00 13.40 15.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 50 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00010 Uncl Excav (CIP) Cubic Yard ============================================= NH0342-043 ON US 34 IN WELD COUNTY 01/24/08 590.00 20.00 9.74 8.00 SHE0741-016 THE INTERSECTION OF SH 74 AND 02/14/08 100.00 47.00 55.60 45.00 C 0702-274 FRISCO (MM 201) TO EAST VAIL 03/06/08 3,424.00 210.00 171.03 185.00 SHE0702-276 EAGLE COUNTY I-70 MP 171 TO M 03/13/08 7,356.02 14.00 20.00 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 66,690.02 24.17 19.11 24.13 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 185,013.00 5.75 9.14 7.50 NH5501-013 US 550 N OF NM STATE LINE, MP 04/10/08 62,513.00 12.50 7.50 6.25 SHE 0501-056 US 50 AND 28.5 RD IN GRAND JU 04/10/08 3,104.00 20.00 22.08 15.00 HB0403-052 US40 BERTHOUD PASS 04/24/08 295.00 65.00 126.76 84.00 NH0504-056 US 50 PASSING LANES EAST OF 5 05/15/08 47,672.00 7.00 7.03 4.56 STS 1151-021 SH 115 AT CR F45 IN FREMONT C 05/15/08 495.00 29.00 24.63 25.50 NH0063-024 US 6 EAGLE 05/22/08 1,270.00 20.00 52.15 35.00 C 090A-002 ON S.H. 90 FROM M.P. 10.6 TO 05/22/08 3,754.00 25.00 19.90 24.12 C0703-337 I-70 EMPIRE JCT. EAST OVERLAY 06/05/08 1,049.00 19.75 35.73 44.00 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 33,440.00 12.00 10.80 14.90 C119A-054 SH 119 FROM MP 6.5 TO MP 8.0 06/19/08 150.00 75.00 44.63 22.00 SHE3921-008 SH 392 @ WCR 31(HES) 06/19/08 1,791.00 17.00 23.17 18.00 STA069A-024 SH 69 HUERFANO COUNTY 06/26/08 151.00 30.00 43.33 40.00 C0702-275 I-70 VAIL PASS 06/26/08 15,705.00 20.00 25.88 28.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 356,402.00 8.91 9.45 9.11 STA0831-106 PARKER RD. (SH 83) MP 65.5 TO 07/10/08 1,600.00 25.00 17.08 15.30 SHE0831-102 PARKER RD: LONG AVE INTERSECT 07/24/08 699.00 25.00 23.20 6.00 NH 2854-109 US 285: DEER CREEK INTERCHANG 07/31/08 54,234.00 8.00 14.92 11.50 SHE R600-310 US285/FED, I-25/120TH, I-270/ 08/14/08 220.00 38.00 46.03 44.66 STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 6,040.00 16.25 19.13 22.75 C0702-284 I-70 TRUCK PARKING AT DOTSERO 09/11/08 20,357.00 13.00 7.33 9.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 83,150.00 10.37 13.89 11.86 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 414,515.00 6.00 3.76 2.65 SHE 0821-082 SH 82/SMITH WAY - PITKIN 10/16/08 2,102.00 15.00 22.38 25.00 NH 1602-117 THIS PROJECT IS LOCATED ABOUT 12/04/08 37,590.00 24.00 20.37 17.00 SHE 0451-009 SH45 (PUEBLO BLVD) AND RED CR 12/04/08 1,108.00 12.00 27.40 14.00 C0063-027 US 6 LOMA STR H-01-E, MP 13.1 12/11/08 2,200.00 22.50 24.61 19.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 457,515.00 7.61 4.45 4.04 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 963,757.02 9.48 7.16 7.98 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 51 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00040 Uncl Excav (Spec) Cubic Yard ============================================= CCR600-303 CHATFIELD STATE PARK MAIN RD, 01/31/08 2,775.00 7.00 8.96 8.10 SHE 050A-007 SH 50 BETWEEN MORRIS/FORTINO 01/31/08 6,135.00 8.00 58.75 49.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8,910.00 7.69 38.62 36.26 NH 2854-109 US 285: DEER CREEK INTERCHANG 07/31/08 4,553.00 16.00 12.82 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,553.00 16.00 12.82 15.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13,463.00 10.50 28.33 29.07 =============== 203-00060 Emb Matl (CIP) Cubic Yard ============================================= NH0853-066 US 85C SH 60 TO LASALLE 01/10/08 929.00 20.00 25.56 14.00 STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 340,053.00 9.00 7.26 5.80 STA 0831-099 SH 83 AT RUSSELLVILLE ROAD SO 01/17/08 3,663.00 16.00 22.06 16.00 CCR600-303 CHATFIELD STATE PARK MAIN RD, 01/31/08 1,382.00 16.00 17.42 11.30 HB 0131-050 SH 13 NORTH OF RIFLE 02/07/08 1,990.00 25.00 44.99 30.00 STA 017A-010 BEGINNING OF SH 17 FROM MP 69 02/14/08 10,873.00 20.00 18.70 15.00 STA0252-397 I25 NORTHGATE NORTH 02/14/08 5,701.00 10.00 18.02 19.06 STU 0251-329 S OF COLORADO CITY TO CEDARWO 03/06/08 4,483.00 15.00 17.84 6.22 HB0132-017 SH13 WY STATE LINE SOUTH OVER 03/13/08 47,810.00 14.00 18.43 15.50 BR 0403-051 US 40 MP 245.85 03/27/08 25.00 82.00 32.00 32.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 416,909.00 10.13 10.22 7.58 NH 2871-031 US 287 SOUTH OF LAMAR FROM MP 04/03/08 72,232.00 9.00 10.49 6.50 C 067A-026 SH67 AND CR81 04/10/08 6,165.00 10.00 29.82 18.00 NH 0503-064 US 50:15TH AND 16TH ST IN CAN 04/17/08 50.00 25.00 100.18 80.00 STA 0343-026 ON US 34 IN YUMA COUNTY 04/17/08 6,490.00 12.50 20.00 17.00 IM 0705-077 I70 WEST OF BURLINGTON EAST I 04/17/08 91,784.00 9.75 8.96 7.89 STA009A-025 SH9 FROM FAIRPLAY TO HARTSEL 05/01/08 10,170.00 12.25 18.27 13.50 STA0703-334 I-70 FROM BAKERVILLE TO EAST 05/15/08 9,679.00 12.75 24.57 22.75 STS 1151-021 SH 115 AT CR F45 IN FREMONT C 05/15/08 655.00 20.00 29.02 22.10 STA 069A-023 SH 69 WESTCLIFFE AREA - CUSTE 06/26/08 4,915.00 15.00 17.19 18.00 STA086A-048 INTERSECTION OF SH 86 & COUNT 06/26/08 76.00 75.00 76.75 43.00 STA069A-024 SH 69 HUERFANO COUNTY 06/26/08 1,391.50 20.00 26.12 40.00 STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 279,647.00 6.50 11.53 6.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 483,254.50 8.02 11.66 7.89 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 52 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00060 Emb Matl (CIP) Cubic Yard ============================================= STA R400-147 ON SH 52 IN MORGAN COUNTY 07/24/08 13,178.00 13.00 18.90 11.50 NHC040-027 POWERS BLVD - FROM WOODMEN RO 08/21/08 868.00 35.00 31.37 25.00 BRS R200-154 I-25 MP 59.09, MP 65.6, MP 79 09/04/08 30.00 40.00 105.75 43.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 14,076.00 14.41 19.45 12.40 BRS120A-008 ON SH 120 AT MP 2.76 IN FREMO 10/09/08 6,830.00 13.00 12.56 11.53 NH1601-058 ON US 160, FROM M.P. 21.40 TO 10/09/08 17,342.00 10.00 15.80 7.00 C1601-057 ON U.S. 160, APPROXIMATELY M. 12/04/08 42,344.00 13.00 19.50 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 66,516.00 12.22 17.64 14.47 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 980,755.50 9.29 11.82 8.27 =============== 203-00061 Emb Matl (CIP) Ton ==================================================== NH0342-043 ON US 34 IN WELD COUNTY 01/24/08 2,147.00 20.00 12.13 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,147.00 20.00 12.13 14.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,147.00 20.00 12.13 14.00 =============== 203-00062 Emb Matl (CIP) (Spec) Cubic Yard ============================================= STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 69,719.00 15.00 11.87 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 69,719.00 15.00 11.87 11.00 NH 2871-031 US 287 SOUTH OF LAMAR FROM MP 04/03/08 8,639.00 12.00 14.82 11.26 NH0504-056 US 50 PASSING LANES EAST OF 5 05/15/08 40,304.00 12.00 12.86 6.59 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 48,943.00 12.00 13.03 7.41 BR 0361-088 US36 AND CHERRYVALE RD 10/16/08 22,584.00 13.00 13.76 13.84 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 22,584.00 13.00 13.76 13.84 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 141,246.00 13.64 12.75 10.21 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 53 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00100 Muck Excav Cubic Yard ============================================= STA133A-034 133/187 RESURFACING 01/03/08 11.00 50.00 67.00 50.00 HB131A-033 SH 131 ROUTT COUNTY 01/10/08 2,000.00 14.00 13.70 16.50 HB135A-024 SH 135 CRESTED BUTTE SOUTH 02/14/08 11.00 50.00 86.75 100.00 C 0253-202 I-25 02/15/08 2,500.00 12.00 15.00 15.00 STA 002A-001 COLO. BLVD(SH 2A): MEXICO TO 02/28/08 125.00 30.00 50.76 71.76 HB0132-017 SH13 WY STATE LINE SOUTH OVER 03/13/08 492.00 35.00 26.62 32.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,139.00 15.58 18.50 18.85 C 1191-023 FROM MP 0.0 TO MP 2.6 GILPIN 04/03/08 1,000.00 16.75 32.43 15.00 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 5,000.00 10.50 11.80 9.00 NH5501-013 US 550 N OF NM STATE LINE, MP 04/10/08 400.00 34.00 19.76 20.00 STA 0343-026 ON US 34 IN YUMA COUNTY 04/17/08 100.00 18.00 19.33 18.00 IM 0704-207 I-70 FROM I-225 TO TOWER RD 04/17/08 220.00 6.00 69.75 35.00 IM 0705-077 I70 WEST OF BURLINGTON EAST I 04/17/08 5,000.00 11.50 16.64 8.63 STA 009A-001 SH 9 HOOSIER PASS NORTH - PHA 05/01/08 500.00 30.00 60.25 16.00 NH0504-056 US 50 PASSING LANES EAST OF 5 05/15/08 1,000.00 15.00 11.41 5.00 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 2,000.00 35.00 24.00 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 15,220.00 16.00 17.09 13.38 STA0831-106 PARKER RD. (SH 83) MP 65.5 TO 07/10/08 100.00 23.00 41.85 57.10 NH 2854-109 US 285: DEER CREEK INTERCHANG 07/31/08 100.00 35.00 18.64 15.00 STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 200.00 25.00 26.68 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 400.00 27.00 29.29 23.53 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 500.00 20.00 10.66 8.90 NH1601-058 ON US 160, FROM M.P. 21.40 TO 10/09/08 200.00 10.00 35.05 20.00 C1601-057 ON U.S. 160, APPROXIMATELY M. 12/04/08 3,000.00 18.00 19.17 11.00 C0063-027 US 6 LOMA STR H-01-E, MP 13.1 12/11/08 86.00 19.00 32.65 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,786.00 17.86 18.41 11.29 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 24,545.00 16.38 17.73 14.37 =============== 203-00210 Borrow (CIP) Cubic Yard ============================================= C0703-337 I-70 EMPIRE JCT. EAST OVERLAY 06/05/08 1,134.00 29.00 18.25 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,134.00 29.00 18.25 21.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,134.00 29.00 18.25 21.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 54 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00400 Rock Excav Cubic Yard ============================================= C 1191-023 FROM MP 0.0 TO MP 2.6 GILPIN 04/03/08 31,990.00 23.25 25.08 19.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 31,990.00 23.25 25.08 19.15 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 2,000.00 30.00 15.62 19.47 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,000.00 30.00 15.62 19.47 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 33,990.00 23.65 24.23 19.17 =============== 203-00510 Rock Fill (Spec) Cubic Yard ============================================= C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 651.00 50.00 29.86 4.44 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 651.00 50.00 29.86 4.44 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 651.00 50.00 29.86 4.44 =============== 203-00592 Rock Staining Sq Foot ================================================ C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 10,000.00 3.00 2.49 1.93 NH 1602-117 THIS PROJECT IS LOCATED ABOUT 12/04/08 6,954.00 2.00 4.16 3.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 16,954.00 2.59 2.82 2.66 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16,954.00 2.59 2.82 2.66 =============== 203-00595 Rock Scaling Sq Yard ================================================ HB0403-052 US40 BERTHOUD PASS 04/24/08 302.00 10.00 33.47 28.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 302.00 10.00 33.47 28.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 302.00 10.00 33.47 28.00 =============== 203-00598 Rock Scaling Hour =================================================== NH 1602-117 THIS PROJECT IS LOCATED ABOUT 12/04/08 30.00 500.00 289.85 240.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 30.00 500.00 289.85 240.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 30.00 500.00 289.85 240.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 55 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-00850 Polystyrene Fill (CIP) Cubic Yard ============================================= HB 0131-050 SH 13 NORTH OF RIFLE 02/07/08 5,500.00 75.00 81.56 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,500.00 75.00 81.56 80.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,500.00 75.00 81.56 80.00 =============== 203-01100 Proof Rolling Hour =================================================== HB131A-033 SH 131 ROUTT COUNTY 01/10/08 139.00 120.00 111.25 96.25 STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 50.00 100.00 109.14 83.00 CCR600-303 CHATFIELD STATE PARK MAIN RD, 01/31/08 5.00 120.00 121.20 135.00 STA 017A-010 BEGINNING OF SH 17 FROM MP 69 02/14/08 30.00 120.00 93.45 70.00 HB0132-017 SH13 WY STATE LINE SOUTH OVER 03/13/08 10.00 100.00 126.00 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 234.00 114.87 109.57 92.75 NH 2871-031 US 287 SOUTH OF LAMAR FROM MP 04/03/08 10.00 120.00 163.89 205.40 C 1191-023 FROM MP 0.0 TO MP 2.6 GILPIN 04/03/08 8.00 115.00 186.43 100.00 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 200.00 98.00 121.05 60.00 C 067A-026 SH67 AND CR81 04/10/08 40.00 120.00 119.64 175.00 NH0504-056 US 50 PASSING LANES EAST OF 5 05/15/08 100.00 100.00 90.57 75.00 C 090A-002 ON S.H. 90 FROM M.P. 10.6 TO 05/22/08 12.00 120.00 109.89 65.00 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 120.00 100.00 135.00 150.00 SHE3921-008 SH 392 @ WCR 31(HES) 06/19/08 10.00 120.00 118.58 159.50 STA 069A-023 SH 69 WESTCLIFFE AREA - CUSTE 06/26/08 40.00 120.00 94.01 50.00 STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 80.00 90.00 112.45 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 620.00 101.87 115.32 91.82 STA0831-106 PARKER RD. (SH 83) MP 65.5 TO 07/10/08 5.00 124.00 139.49 145.90 STA R400-147 ON SH 52 IN MORGAN COUNTY 07/24/08 20.00 120.00 103.50 70.00 STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 20.00 93.00 135.89 136.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 45.00 108.44 119.22 107.77 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 40.00 100.00 117.95 159.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 56 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01100 Proof Rolling Hour =================================================== NH1601-058 ON US 160, FROM M.P. 21.40 TO 10/09/08 40.00 150.00 148.40 150.00 NH 1602-117 THIS PROJECT IS LOCATED ABOUT 12/04/08 25.00 200.00 117.69 98.00 C1601-057 ON U.S. 160, APPROXIMATELY M. 12/04/08 60.00 110.00 122.50 110.00 C0063-027 US 6 LOMA STR H-01-E, MP 13.1 12/11/08 10.00 100.00 84.06 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 175.00 129.14 121.54 124.63 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,074.00 109.42 115.67 98.04 =============== 203-01140 Rolling Hour =================================================== NH 2851-004 US 285 RESURFACE FROM NEW MEX 02/07/08 25.00 110.00 92.65 105.60 C 5502-063 US 550 SILVERTON TO RED MTN P 02/07/08 80.00 95.00 121.62 140.00 STA 017A-010 BEGINNING OF SH 17 FROM MP 69 02/14/08 30.00 150.00 97.85 70.00 NH 1602-116 SOUTH FORK EAST 02/14/08 40.00 102.00 96.64 98.57 SHE0702-276 EAGLE COUNTY I-70 MP 171 TO M 03/13/08 20.00 100.00 130.00 140.00 NH 1603-025 US 160 ALAMOSA MILL AND FILL 03/27/08 24.00 150.00 79.35 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 219.00 112.01 106.54 104.67 NH5501-013 US 550 N OF NM STATE LINE, MP 04/10/08 40.00 125.00 128.02 100.00 NH0504-056 US 50 PASSING LANES EAST OF 5 05/15/08 50.00 100.00 108.57 75.00 C 090A-002 ON S.H. 90 FROM M.P. 10.6 TO 05/22/08 15.00 120.00 114.07 75.00 C0702-275 I-70 VAIL PASS 06/26/08 4.00 100.00 130.00 130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 109.00 111.93 116.59 86.19 C0702-284 I-70 TRUCK PARKING AT DOTSERO 09/11/08 10.00 140.00 106.40 70.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 140.00 106.40 70.00 NH1601-058 ON US 160, FROM M.P. 21.40 TO 10/09/08 20.00 150.00 119.40 100.00 PLH 150A-007 INTERSECTION OF US 160 & SH 1 10/09/08 30.00 120.00 160.00 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 50.00 132.00 134.63 106.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 388.00 115.28 112.97 98.76 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 57 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01500 Blading Hour =================================================== NH 0821-085 SH82 EAGLE COUNTY 01/03/08 20.00 100.00 146.50 113.00 STA139A-029 N OF DOUGLAS PASS CHIP SEALS 01/03/08 20.00 120.00 161.25 150.00 STA133A-034 133/187 RESURFACING 01/03/08 40.00 130.00 116.00 140.00 HB131A-033 SH 131 ROUTT COUNTY 01/10/08 139.00 135.00 139.00 155.00 NH0853-066 US 85C SH 60 TO LASALLE 01/10/08 270.00 120.00 109.93 125.00 STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 50.00 150.00 149.95 140.00 IM0701-189 PALISADE EAST 01/17/08 40.00 110.00 115.05 110.00 STA 0831-099 SH 83 AT RUSSELLVILLE ROAD SO 01/17/08 6.00 171.00 161.69 115.00 IM 0252-392 I-25, TOMAH ROAD TO DOUGLAS L 01/17/08 10.00 149.00 133.48 106.50 NH0342-043 ON US 34 IN WELD COUNTY 01/24/08 50.00 118.00 126.00 125.00 STA 093A-007 ON SH 93 IN BOULDER COUNTY 01/24/08 50.00 130.00 116.14 105.00 C0253-199 I25 RUBBILIZATION N OF SH 56 01/24/08 40.00 140.00 115.67 105.00 CCR600-303 CHATFIELD STATE PARK MAIN RD, 01/31/08 30.00 120.00 131.98 145.00 NH0342-048 US 34 IN WELD COUNTY 02/07/08 50.00 115.00 120.43 92.00 NH 2851-004 US 285 RESURFACE FROM NEW MEX 02/07/08 45.00 150.00 103.58 109.32 C 5502-063 US 550 SILVERTON TO RED MTN P 02/07/08 80.00 134.00 146.81 200.00 HB 0131-050 SH 13 NORTH OF RIFLE 02/07/08 30.00 125.00 133.33 140.00 HB135A-024 SH 135 CRESTED BUTTE SOUTH 02/14/08 40.00 130.00 118.24 100.00 STA 017A-010 BEGINNING OF SH 17 FROM MP 69 02/14/08 60.00 150.00 124.80 100.00 STA0252-397 I25 NORTHGATE NORTH 02/14/08 150.00 130.00 159.64 93.47 NH 1602-116 SOUTH FORK EAST 02/14/08 20.00 153.00 108.82 125.27 NH 0404-046 COLFAX AVE: ARAPAHOE/ADAMS CO 02/28/08 16.00 135.00 140.11 191.30 STA 079A-011 SH40 / SH79, SH40 (309.26-31 02/28/08 20.00 137.00 133.41 146.40 STU 0251-329 S OF COLORADO CITY TO CEDARWO 03/06/08 60.00 80.00 123.28 126.41 HB0132-017 SH13 WY STATE LINE SOUTH OVER 03/13/08 100.00 140.00 148.50 192.00 SHE0702-276 EAGLE COUNTY I-70 MP 171 TO M 03/13/08 20.00 140.00 153.33 140.00 STA 072A-030 SH 72, 64TH AVE TO 84TH PKWY 03/13/08 30.00 120.00 125.88 105.00 IM0703-327 I-70 SILVERTHORNE TO EJMT 03/20/08 40.00 128.00 128.48 120.75 STA052A-029 ON SH 52 IN WELD COUNTY 03/20/08 25.00 125.00 113.13 103.75 NH 1603-025 US 160 ALAMOSA MILL AND FILL 03/27/08 24.00 150.00 91.69 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,575.00 128.54 128.09 128.25 NH 2871-031 US 287 SOUTH OF LAMAR FROM MP 04/03/08 150.00 130.00 133.41 120.00 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 300.00 109.00 119.75 81.49 NH5501-013 US 550 N OF NM STATE LINE, MP 04/10/08 40.00 150.00 156.35 115.00 C 067A-026 SH67 AND CR81 04/10/08 50.00 120.00 132.74 150.00 NH 0503-064 US 50:15TH AND 16TH ST IN CAN 04/17/08 16.00 150.00 161.03 140.00 STA 0343-026 ON US 34 IN YUMA COUNTY 04/17/08 200.00 120.00 128.33 135.00 IM 0705-077 I70 WEST OF BURLINGTON EAST I 04/17/08 220.00 116.00 138.62 105.56 STA 009A-001 SH 9 HOOSIER PASS NORTH - PHA 05/01/08 40.00 150.00 147.50 145.00 STA009A-025 SH9 FROM FAIRPLAY TO HARTSEL 05/01/08 70.00 119.00 123.67 112.00 NH0504-056 US 50 PASSING LANES EAST OF 5 05/15/08 50.00 150.00 128.75 75.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 58 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01500 Blading Hour =================================================== STA0703-334 I-70 FROM BAKERVILLE TO EAST 05/15/08 40.00 135.00 177.00 180.00 SHE 0761-195 I-76: BURLINGTON CANAL TO BRO 05/15/08 150.00 134.00 155.14 145.00 STS 1151-021 SH 115 AT CR F45 IN FREMONT C 05/15/08 10.00 140.00 147.58 152.00 NH0063-024 US 6 EAGLE 05/22/08 20.00 130.00 149.33 130.00 C 090A-002 ON S.H. 90 FROM M.P. 10.6 TO 05/22/08 10.00 150.00 148.34 145.00 C0703-337 I-70 EMPIRE JCT. EAST OVERLAY 06/05/08 20.00 142.00 117.50 125.00 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 200.00 150.00 151.67 135.00 IM 070A-003 I 70 BETWEEN DENVER AND VAIL 06/12/08 60.00 160.00 149.00 140.00 C0703-330 I-70 TWIN TUNNELS WESTBOUND 06/12/08 10.00 180.00 251.63 175.00 SHE3921-008 SH 392 @ WCR 31(HES) 06/19/08 20.00 120.00 125.75 159.50 C 1601-060 US 160 MONTEZUMA COUNTY 06/26/08 24.00 140.00 177.00 240.00 STA 069A-023 SH 69 WESTCLIFFE AREA - CUSTE 06/26/08 50.00 150.00 127.11 120.00 STA086A-048 INTERSECTION OF SH 86 & COUNT 06/26/08 5.00 200.00 217.25 300.00 STA069A-024 SH 69 HUERFANO COUNTY 06/26/08 25.00 150.00 156.05 185.00 C0702-275 I-70 VAIL PASS 06/26/08 40.00 140.00 150.00 155.00 STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 200.00 100.00 139.68 105.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,020.00 127.13 136.76 122.20 STA R400-147 ON SH 52 IN MORGAN COUNTY 07/24/08 50.00 120.00 124.84 110.00 NH 2854-109 US 285: DEER CREEK INTERCHANG 07/31/08 40.00 141.00 153.58 125.00 SHE R600-310 US285/FED, I-25/120TH, I-270/ 08/14/08 40.00 127.00 216.20 229.00 NHC040-027 POWERS BLVD - FROM WOODMEN RO 08/21/08 50.00 130.00 161.20 100.00 STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 40.00 110.00 157.64 175.00 NH0503-065 3 MILES WEST OF COTOPAXI 08/28/08 40.00 150.00 182.11 171.57 C0702-284 I-70 TRUCK PARKING AT DOTSERO 09/11/08 10.00 140.00 146.00 100.00 NH 0501-057 ON US HWY 50 FROM MP. 38.0 TO 09/11/08 10.00 130.00 127.32 124.64 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 280.00 129.71 155.97 145.60 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 200.00 130.00 138.04 135.00 BRS120A-008 ON SH 120 AT MP 2.76 IN FREMO 10/09/08 100.00 150.00 120.27 131.11 NH1601-058 ON US 160, FROM M.P. 21.40 TO 10/09/08 60.00 150.00 133.40 140.00 PLH 150A-007 INTERSECTION OF US 160 & SH 1 10/09/08 60.00 125.00 67.00 110.00 BR 0361-088 US36 AND CHERRYVALE RD 10/16/08 140.00 130.00 128.47 125.00 SHE 0821-082 SH 82/SMITH WAY - PITKIN 10/16/08 10.00 200.00 126.25 100.00 C1601-057 ON U.S. 160, APPROXIMATELY M. 12/04/08 120.00 120.00 110.00 110.00 C0063-027 US 6 LOMA STR H-01-E, MP 13.1 12/11/08 20.00 130.00 126.97 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 710.00 133.38 127.39 123.96 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,585.00 128.74 133.44 125.98 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 59 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01510 Backhoe Hour =================================================== STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 150.00 125.00 142.19 150.00 NH 2851-004 US 285 RESURFACE FROM NEW MEX 02/07/08 2.00 175.00 200.02 100.07 HB 0131-050 SH 13 NORTH OF RIFLE 02/07/08 24.00 150.00 162.50 95.00 STA 017A-010 BEGINNING OF SH 17 FROM MP 69 02/14/08 20.00 150.00 139.65 125.00 STA0252-397 I25 NORTHGATE NORTH 02/14/08 100.00 140.00 195.24 190.73 NH 1602-116 SOUTH FORK EAST 02/14/08 2.00 197.00 156.60 136.38 SHE0702-276 EAGLE COUNTY I-70 MP 171 TO M 03/13/08 20.00 120.00 160.00 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 318.00 133.63 158.78 156.06 NH 2871-031 US 287 SOUTH OF LAMAR FROM MP 04/03/08 4.00 200.00 158.41 170.00 C 1191-023 FROM MP 0.0 TO MP 2.6 GILPIN 04/03/08 140.00 106.00 161.43 115.00 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 40.00 101.00 140.79 81.49 IM 0705-077 I70 WEST OF BURLINGTON EAST I 04/17/08 25.00 127.00 157.68 130.47 IM 0702-281 I-70 IN DOWD CANYON 04/30/08 80.00 165.00 185.50 132.00 NH0504-056 US 50 PASSING LANES EAST OF 5 05/15/08 50.00 150.00 140.71 75.00 C0703-337 I-70 EMPIRE JCT. EAST OVERLAY 06/05/08 100.00 128.00 136.67 150.00 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 200.00 120.00 195.00 190.00 IM 070A-003 I 70 BETWEEN DENVER AND VAIL 06/12/08 60.00 150.00 159.00 180.00 C0702-275 I-70 VAIL PASS 06/26/08 16.00 120.00 151.25 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 715.00 127.66 162.76 145.19 STA0831-106 PARKER RD. (SH 83) MP 65.5 TO 07/10/08 25.00 131.00 123.33 95.60 C0702-284 I-70 TRUCK PARKING AT DOTSERO 09/11/08 10.00 140.00 114.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 35.00 133.57 121.46 96.86 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 40.00 130.00 148.45 175.00 BRS120A-008 ON SH 120 AT MP 2.76 IN FREMO 10/09/08 100.00 150.00 138.94 150.19 BR 0361-088 US36 AND CHERRYVALE RD 10/16/08 20.00 150.00 129.06 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 160.00 145.00 140.83 151.37 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,228.00 131.63 155.05 147.43 =============== 203-01515 Backhoe (Landscaping) Hour =================================================== BRS R200-154 I-25 MP 59.09, MP 65.6, MP 79 09/04/08 4.00 130.00 147.00 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 130.00 147.00 140.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 130.00 147.00 140.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 60 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01550 Dozing Hour =================================================== STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 200.00 160.00 142.32 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 200.00 160.00 142.32 120.00 C 1191-023 FROM MP 0.0 TO MP 2.6 GILPIN 04/03/08 50.00 133.00 189.29 100.00 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 300.00 116.00 138.11 81.49 C 067A-026 SH67 AND CR81 04/10/08 40.00 130.00 159.49 200.00 IM 0705-077 I70 WEST OF BURLINGTON EAST I 04/17/08 100.00 158.00 161.39 130.47 HB0403-052 US40 BERTHOUD PASS 04/24/08 20.00 120.00 206.10 150.00 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 40.00 120.00 163.33 125.00 C0702-275 I-70 VAIL PASS 06/26/08 32.00 150.00 207.50 275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 582.00 127.92 150.66 115.63 STA0831-106 PARKER RD. (SH 83) MP 65.5 TO 07/10/08 25.00 140.00 168.63 146.00 STA R400-147 ON SH 52 IN MORGAN COUNTY 07/24/08 50.00 120.00 162.38 135.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 75.00 126.67 164.16 138.67 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 210.00 150.00 164.98 224.00 BR 0361-088 US36 AND CHERRYVALE RD 10/16/08 20.00 130.00 141.37 160.00 C1601-057 ON U.S. 160, APPROXIMATELY M. 12/04/08 40.00 180.00 125.83 130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 270.00 152.96 160.26 205.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,127.00 139.53 154.12 139.43 =============== 203-01555 Dozing (Landscaping) Hour =================================================== C 067A-026 SH67 AND CR81 04/10/08 4.00 125.00 184.88 250.00 C0702-275 I-70 VAIL PASS 06/26/08 34.00 150.00 157.50 185.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 38.00 147.37 161.01 191.84 BRS R200-154 I-25 MP 59.09, MP 65.6, MP 79 09/04/08 100.00 125.00 185.00 215.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 100.00 125.00 185.00 215.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 138.00 131.16 178.27 208.62 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 61 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01565 Hydraulic Excavator Hour =================================================== C 1601-060 US 160 MONTEZUMA COUNTY 06/26/08 24.00 200.00 177.80 145.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 24.00 200.00 177.80 145.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 24.00 200.00 177.80 145.00 =============== 203-01582 Truck (Dump) Hour =================================================== NH 0821-085 SH82 EAGLE COUNTY 01/03/08 20.00 110.00 120.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 110.00 120.00 100.00 C 1191-023 FROM MP 0.0 TO MP 2.6 GILPIN 04/03/08 40.00 81.00 110.14 82.00 C0703-337 I-70 EMPIRE JCT. EAST OVERLAY 06/05/08 20.00 99.00 80.67 80.00 C0702-275 I-70 VAIL PASS 06/26/08 24.00 120.00 111.25 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 84.00 96.43 106.33 86.67 SHE 0821-082 SH 82/SMITH WAY - PITKIN 10/16/08 20.00 110.00 98.75 80.00 IM0703-324 GEORGETOWN HILL CHUTE 4 PHASE 12/11/08 40.00 150.00 120.92 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 60.00 136.67 114.59 86.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 164.00 112.80 110.11 88.29 =============== 203-01590 Front End Loader (Rubber) Hour =================================================== STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 100.00 130.00 138.26 140.00 C 5502-063 US 550 SILVERTON TO RED MTN P 02/07/08 40.00 156.00 119.81 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 140.00 137.43 132.99 135.71 C 1191-023 FROM MP 0.0 TO MP 2.6 GILPIN 04/03/08 40.00 126.00 157.86 110.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 62 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01590 Front End Loader (Rubber) Hour =================================================== IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 200.00 100.00 123.32 81.49 C0703-337 I-70 EMPIRE JCT. EAST OVERLAY 06/05/08 20.00 127.00 140.33 120.00 C0703-330 I-70 TWIN TUNNELS WESTBOUND 06/12/08 40.00 160.00 176.80 125.00 C0702-275 I-70 VAIL PASS 06/26/08 8.00 130.00 141.25 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 308.00 113.70 130.22 94.34 NH0503-065 3 MILES WEST OF COTOPAXI 08/28/08 135.00 140.00 148.79 171.57 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 135.00 140.00 148.79 171.57 IM0703-324 GEORGETOWN HILL CHUTE 4 PHASE 12/11/08 20.00 140.00 133.31 73.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 20.00 140.00 133.31 73.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 603.00 125.97 133.05 120.53 =============== 203-01594 Combination Loader Hour =================================================== NH 0821-085 SH82 EAGLE COUNTY 01/03/08 20.00 125.00 103.50 77.00 STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 250.00 120.00 107.67 77.00 NH 2851-004 US 285 RESURFACE FROM NEW MEX 02/07/08 2.00 150.00 98.52 154.07 C 5502-063 US 550 SILVERTON TO RED MTN P 02/07/08 40.00 119.00 124.18 125.00 HB 0131-050 SH 13 NORTH OF RIFLE 02/07/08 20.00 120.00 116.83 95.00 STA0252-397 I25 NORTHGATE NORTH 02/14/08 100.00 110.00 177.91 68.74 NH 1602-116 SOUTH FORK EAST 02/14/08 2.00 133.00 121.22 174.88 C 0702-274 FRISCO (MM 201) TO EAST VAIL 03/06/08 30.00 180.00 487.00 1020.00 STU 0251-329 S OF COLORADO CITY TO CEDARWO 03/06/08 30.00 100.00 113.94 159.71 IM0703-327 I-70 SILVERTHORNE TO EJMT 03/20/08 40.00 94.00 114.73 114.50 BR 0403-051 US 40 MP 245.85 03/27/08 20.00 100.00 115.00 115.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 554.00 118.03 135.73 139.88 C 1191-023 FROM MP 0.0 TO MP 2.6 GILPIN 04/03/08 100.00 94.00 117.14 90.00 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 200.00 79.00 97.92 70.00 NH5501-013 US 550 N OF NM STATE LINE, MP 04/10/08 65.00 130.00 118.57 80.00 C 067A-026 SH67 AND CR81 04/10/08 20.00 130.00 95.40 150.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 63 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01594 Combination Loader Hour =================================================== STA 009A-001 SH 9 HOOSIER PASS NORTH - PHA 05/01/08 80.00 105.00 116.25 100.00 NH0504-056 US 50 PASSING LANES EAST OF 5 05/15/08 20.00 120.00 101.09 75.00 C 090A-002 ON S.H. 90 FROM M.P. 10.6 TO 05/22/08 10.00 150.00 122.79 100.00 C0703-337 I-70 EMPIRE JCT. EAST OVERLAY 06/05/08 20.00 105.00 140.33 120.00 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 100.00 130.00 140.00 160.00 IM 070A-003 I 70 BETWEEN DENVER AND VAIL 06/12/08 40.00 180.00 153.50 130.00 C 1601-060 US 160 MONTEZUMA COUNTY 06/26/08 24.00 120.00 131.00 90.00 STA 069A-023 SH 69 WESTCLIFFE AREA - CUSTE 06/26/08 20.00 120.00 116.47 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 699.00 108.91 110.93 100.52 NH 2854-109 US 285: DEER CREEK INTERCHANG 07/31/08 30.00 155.00 124.24 92.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 30.00 155.00 124.24 92.00 BRS120A-008 ON SH 120 AT MP 2.76 IN FREMO 10/09/08 100.00 120.00 94.40 88.42 NH1601-058 ON US 160, FROM M.P. 21.40 TO 10/09/08 40.00 140.00 119.20 100.00 SHE 0821-082 SH 82/SMITH WAY - PITKIN 10/16/08 20.00 125.00 92.50 90.00 NH 1602-117 THIS PROJECT IS LOCATED ABOUT 12/04/08 130.00 100.00 121.40 84.00 C1601-057 ON U.S. 160, APPROXIMATELY M. 12/04/08 70.00 100.00 99.00 84.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 360.00 111.39 104.20 87.34 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,643.00 113.37 115.90 110.75 =============== 203-01597 Potholing Hour =================================================== HB131A-033 SH 131 ROUTT COUNTY 01/10/08 14.00 200.00 222.40 112.00 STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 40.00 200.00 203.84 270.00 STA 0831-099 SH 83 AT RUSSELLVILLE ROAD SO 01/17/08 40.00 190.00 184.22 170.00 ITS0361-087 US 36 (FEDERAL BLVD TO BOULDE 01/31/08 50.00 130.00 140.12 125.00 CCR600-303 CHATFIELD STATE PARK MAIN RD, 01/31/08 20.00 170.00 201.13 135.00 SHE 050A-007 SH 50 BETWEEN MORRIS/FORTINO 01/31/08 100.00 150.00 207.58 300.00 NH 2851-004 US 285 RESURFACE FROM NEW MEX 02/07/08 16.00 200.00 162.25 104.00 STA2873-148 FEDRERAL BLVD (SH 287) AT 70T 02/07/08 20.00 180.00 158.72 150.00 HB135A-024 SH 135 CRESTED BUTTE SOUTH 02/14/08 40.00 150.00 175.00 100.00 IM 0252-386 I-25: RESURFACE 23RD TO 48TH 02/14/08 40.00 180.00 143.86 135.00 STA 017A-010 BEGINNING OF SH 17 FROM MP 69 02/14/08 40.00 200.00 190.18 155.00 STA 391A-003 KIPLING: 6TH AVE TO COLFAX 02/14/08 20.00 200.00 162.92 85.47 NH0405-032 COLFAX AVENUE FROM COLORADO 02/28/08 10.00 150.00 235.22 171.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 64 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01597 Potholing Hour =================================================== NH 0404-046 COLFAX AVE: ARAPAHOE/ADAMS CO 02/28/08 25.00 180.00 183.28 165.00 STA 002A-001 COLO. BLVD(SH 2A): MEXICO TO 02/28/08 20.00 180.00 233.73 159.03 IM0252-393 DENVER - I-25 FROM SANTA FE D 02/28/08 20.00 200.00 221.20 165.00 STA 079A-011 SH40 / SH79, SH40 (309.26-31 02/28/08 10.00 185.00 213.09 216.89 C 0702-274 FRISCO (MM 201) TO EAST VAIL 03/06/08 70.00 167.00 188.89 280.00 HB0132-017 SH13 WY STATE LINE SOUTH OVER 03/13/08 20.00 180.00 225.00 265.00 SHE0702-276 EAGLE COUNTY I-70 MP 171 TO M 03/13/08 10.00 200.00 205.00 140.00 STA 072A-030 SH 72, 64TH AVE TO 84TH PKWY 03/13/08 10.00 160.00 213.68 153.00 NH 1603-025 US 160 ALAMOSA MILL AND FILL 03/27/08 20.00 200.00 213.33 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 655.00 173.50 191.09 192.99 NH 2871-031 US 287 SOUTH OF LAMAR FROM MP 04/03/08 40.00 200.00 211.12 250.00 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 200.00 121.00 213.68 142.00 NH5501-013 US 550 N OF NM STATE LINE, MP 04/10/08 60.00 200.00 214.53 195.00 SHE 0501-056 US 50 AND 28.5 RD IN GRAND JU 04/10/08 20.00 175.00 195.00 175.00 C 067A-026 SH67 AND CR81 04/10/08 50.00 160.00 213.46 250.00 NH 030A-026 SH30 1ST AVE AT HAVANA ST TO 04/17/08 10.00 200.00 179.71 101.34 STA 0343-026 ON US 34 IN YUMA COUNTY 04/17/08 20.00 200.00 176.67 175.00 IM 0704-207 I-70 FROM I-225 TO TOWER RD 04/17/08 40.00 180.00 196.00 322.00 SHE 2854-114 SH 285-BRADEY CT. 05/01/08 5.00 180.00 183.71 100.00 EPSW00-541 DENVER AREA; SH 6, I-25, I-70 05/08/08 40.00 166.00 242.67 120.00 NH0504-056 US 50 PASSING LANES EAST OF 5 05/15/08 80.00 225.00 222.18 200.00 SHE 0761-195 I-76: BURLINGTON CANAL TO BRO 05/15/08 15.00 201.00 158.88 160.00 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 300.00 200.00 298.33 335.00 IM 070A-003 I 70 BETWEEN DENVER AND VAIL 06/12/08 48.00 250.00 296.00 220.00 C119A-054 SH 119 FROM MP 6.5 TO MP 8.0 06/19/08 16.00 200.00 203.83 180.00 SHE3921-008 SH 392 @ WCR 31(HES) 06/19/08 10.00 175.00 213.00 198.00 C 1601-060 US 160 MONTEZUMA COUNTY 06/26/08 10.00 250.00 298.40 175.00 STA 069A-023 SH 69 WESTCLIFFE AREA - CUSTE 06/26/08 50.00 230.00 224.07 150.00 STA086A-048 INTERSECTION OF SH 86 & COUNT 06/26/08 20.00 150.00 193.50 150.00 SHE0091-033 SH9 SIGNAL INTERCONNECT 06/26/08 40.00 181.00 151.75 62.00 STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 40.00 180.00 210.06 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,114.00 184.78 226.10 222.48 STA0831-106 PARKER RD. (SH 83) MP 65.5 TO 07/10/08 20.00 196.00 207.50 250.00 SHE 070A-005 I-70 B FROM PATTERSON (F RD.) 07/17/08 10.00 176.92 197.75 188.76 STA 0404-044 WEST COLFAX AVE. (US 40) FROM 07/17/08 20.00 195.00 186.81 205.94 SHE0831-102 PARKER RD: LONG AVE INTERSECT 07/24/08 24.00 200.00 202.00 200.00 NH 2854-109 US 285: DEER CREEK INTERCHANG 07/31/08 50.00 184.00 233.39 235.00 SHE R600-310 US285/FED, I-25/120TH, I-270/ 08/14/08 40.00 185.00 162.78 109.92 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 65 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01597 Potholing Hour =================================================== NHC040-027 POWERS BLVD - FROM WOODMEN RO 08/21/08 10.00 250.00 230.40 215.00 STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 100.00 151.00 221.29 190.00 C0702-284 I-70 TRUCK PARKING AT DOTSERO 09/11/08 10.00 140.00 213.63 263.16 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 284.00 176.02 210.66 196.25 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 40.00 180.00 218.67 226.00 NH1601-058 ON US 160, FROM M.P. 21.40 TO 10/09/08 10.00 200.00 246.20 100.00 BR 0361-088 US36 AND CHERRYVALE RD 10/16/08 10.00 180.00 231.57 275.00 SHE 0821-082 SH 82/SMITH WAY - PITKIN 10/16/08 15.00 250.00 231.25 250.00 STA0853-069 US 85 & COLLINS ST (EATON) 12/04/08 20.00 95.00 157.15 123.00 C0063-027 US 6 LOMA STR H-01-E, MP 13.1 12/11/08 10.00 190.00 194.15 190.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 105.00 176.67 207.02 199.05 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,158.00 179.81 212.68 208.94 =============== 203-01610 Crane (Rubber Tire) Hour =================================================== STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 50.00 300.00 360.50 460.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 50.00 300.00 360.50 460.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 50.00 300.00 360.50 460.00 =============== 203-01620 Sweeping Hour =================================================== NH0853-066 US 85C SH 60 TO LASALLE 01/10/08 100.00 120.00 113.12 150.00 C 0253-202 I-25 02/15/08 8.00 120.00 165.00 165.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 108.00 120.00 113.81 151.11 SHE 2854-114 SH 285-BRADEY CT. 05/01/08 10.00 120.00 169.83 131.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 120.00 169.83 131.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 118.00 120.00 119.59 149.41 =============== 203-01622 Sweeping (With Pickup Broom) Hour =================================================== SHE 050A-007 SH 50 BETWEEN MORRIS/FORTINO 01/31/08 50.00 90.00 297.63 200.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 66 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01622 Sweeping (With Pickup Broom) Hour =================================================== NH 2851-004 US 285 RESURFACE FROM NEW MEX 02/07/08 10.00 125.00 145.30 161.20 IM 0252-386 I-25: RESURFACE 23RD TO 48TH 02/14/08 300.00 125.00 131.88 130.00 STA 017A-010 BEGINNING OF SH 17 FROM MP 69 02/14/08 20.00 100.00 162.00 100.00 NH 1602-116 SOUTH FORK EAST 02/14/08 10.00 125.00 182.49 314.94 STA 002A-001 COLO. BLVD(SH 2A): MEXICO TO 02/28/08 50.00 120.00 144.52 169.33 NH 1603-025 US 160 ALAMOSA MILL AND FILL 03/27/08 25.00 150.00 143.74 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 465.00 120.97 150.98 146.19 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 130.00 112.00 131.23 105.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 130.00 112.00 131.23 105.00 STA0831-106 PARKER RD. (SH 83) MP 65.5 TO 07/10/08 50.00 123.00 148.65 109.20 STA 0404-044 WEST COLFAX AVE. (US 40) FROM 07/17/08 50.00 128.00 139.49 123.57 SHE R600-310 US285/FED, I-25/120TH, I-270/ 08/14/08 40.00 145.00 203.27 184.35 STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 40.00 125.00 133.96 130.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 180.00 129.72 151.11 134.51 NH1601-058 ON US 160, FROM M.P. 21.40 TO 10/09/08 25.00 150.00 131.60 140.00 BR 0361-088 US36 AND CHERRYVALE RD 10/16/08 20.00 135.00 152.85 135.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 45.00 143.33 142.83 137.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 820.00 122.70 145.98 136.63 =============== 203-02300 Rock Scaler Hour =================================================== C 1191-023 FROM MP 0.0 TO MP 2.6 GILPIN 04/03/08 40.00 131.00 176.17 275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 40.00 131.00 176.17 275.00 NH0503-065 3 MILES WEST OF COTOPAXI 08/28/08 222.00 200.00 205.20 263.97 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 222.00 200.00 205.20 263.97 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 67 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-02300 Rock Scaler Hour =================================================== IM0703-324 GEORGETOWN HILL CHUTE 4 PHASE 12/11/08 100.00 250.00 196.24 115.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 100.00 250.00 196.24 115.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 362.00 206.19 196.48 224.04 =============== 203-02330 Laborer Hour =================================================== NH 0821-085 SH82 EAGLE COUNTY 01/03/08 20.00 40.00 50.50 46.00 C 5502-063 US 550 SILVERTON TO RED MTN P 02/07/08 40.00 50.00 44.19 42.00 SHE0702-276 EAGLE COUNTY I-70 MP 171 TO M 03/13/08 100.00 50.00 48.33 45.00 BR 0403-051 US 40 MP 245.85 03/27/08 50.00 39.00 30.00 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 210.00 46.43 45.62 40.95 IM 0702-281 I-70 IN DOWD CANYON 04/30/08 80.00 55.00 51.70 46.80 STA 009A-001 SH 9 HOOSIER PASS NORTH - PHA 05/01/08 40.00 45.00 44.38 31.50 NH0063-024 US 6 EAGLE 05/22/08 50.00 50.76 53.13 55.00 C0703-337 I-70 EMPIRE JCT. EAST OVERLAY 06/05/08 40.00 40.00 44.83 70.00 C 1601-060 US 160 MONTEZUMA COUNTY 06/26/08 40.00 44.00 36.60 30.00 C0702-275 I-70 VAIL PASS 06/26/08 16.00 50.00 36.75 32.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 266.00 48.49 46.02 46.11 STA0831-106 PARKER RD. (SH 83) MP 65.5 TO 07/10/08 25.00 45.00 37.41 30.30 SHE R600-310 US285/FED, I-25/120TH, I-270/ 08/14/08 40.00 44.00 52.56 45.80 C0702-284 I-70 TRUCK PARKING AT DOTSERO 09/11/08 40.00 50.00 36.20 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 105.00 46.52 42.06 34.19 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 40.00 50.00 36.14 40.00 SHE 0821-082 SH 82/SMITH WAY - PITKIN 10/16/08 40.00 50.00 31.75 30.00 NH 1602-117 THIS PROJECT IS LOCATED ABOUT 12/04/08 40.00 40.00 48.56 31.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 68 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-02330 Laborer Hour =================================================== C1601-057 ON U.S. 160, APPROXIMATELY M. 12/04/08 80.00 40.00 31.34 39.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 200.00 44.00 35.32 35.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 781.00 46.52 41.36 40.48 =============== 206-00000 Str Excav Cubic Yard ============================================= STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 7,896.00 20.00 9.86 10.00 STU 0251-329 S OF COLORADO CITY TO CEDARWO 03/06/08 215.00 25.00 37.18 30.90 SHE0702-276 EAGLE COUNTY I-70 MP 171 TO M 03/13/08 10.00 50.00 130.67 152.00 IM0703-327 I-70 SILVERTHORNE TO EJMT 03/20/08 38.00 30.00 53.45 47.15 BR 0403-051 US 40 MP 245.85 03/27/08 60.00 34.00 37.00 37.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8,219.00 20.32 11.30 11.09 NH 2871-031 US 287 SOUTH OF LAMAR FROM MP 04/03/08 2,257.00 15.00 9.20 9.24 C 1191-023 FROM MP 0.0 TO MP 2.6 GILPIN 04/03/08 608.00 16.00 24.34 20.00 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 15,299.00 8.00 11.08 8.00 NH5501-013 US 550 N OF NM STATE LINE, MP 04/10/08 1,074.00 20.00 16.03 12.80 IM 0705-077 I70 WEST OF BURLINGTON EAST I 04/17/08 26,217.00 5.75 11.63 8.25 STA 009A-001 SH 9 HOOSIER PASS NORTH - PHA 05/01/08 253.00 24.00 22.95 16.00 STA069A-024 SH 69 HUERFANO COUNTY 06/26/08 895.00 20.00 21.77 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 46,603.00 7.77 11.73 8.55 STA R400-147 ON SH 52 IN MORGAN COUNTY 07/24/08 677.00 20.00 10.17 9.00 NH 2854-109 US 285: DEER CREEK INTERCHANG 07/31/08 2,654.00 11.25 12.54 7.50 STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 90.00 20.00 23.91 18.50 BR R400-206 VARIOUS LOCATIONS IN REGION 4 09/11/08 103.00 25.00 39.72 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,524.00 13.56 12.87 8.49 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 22,402.00 10.00 6.51 2.71 BRS120A-008 ON SH 120 AT MP 2.76 IN FREMO 10/09/08 405.00 20.00 19.07 27.53 NH1601-058 ON US 160, FROM M.P. 21.40 TO 10/09/08 59.00 20.00 30.60 40.00 BR 0361-088 US36 AND CHERRYVALE RD 10/16/08 4,656.00 9.50 9.41 7.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 69 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00000 Str Excav Cubic Yard ============================================= SHE 0821-082 SH 82/SMITH WAY - PITKIN 10/16/08 809.00 45.00 39.25 35.00 NH 1602-117 THIS PROJECT IS LOCATED ABOUT 12/04/08 1,152.00 45.00 31.69 36.00 C1601-057 ON U.S. 160, APPROXIMATELY M. 12/04/08 107.00 30.00 23.67 32.00 C0063-027 US 6 LOMA STR H-01-E, MP 13.1 12/11/08 101.00 12.00 22.95 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 29,691.00 12.47 7.87 6.11 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 88,037.00 10.76 9.99 7.96 =============== 206-00060 Str Bkfl (Spec) (Flow-Fill) Cubic Yard ============================================= NH 1602-117 THIS PROJECT IS LOCATED ABOUT 12/04/08 122.00 90.00 165.26 160.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 122.00 90.00 165.26 160.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 122.00 90.00 165.26 160.00 =============== 206-00065 Str Bkfl (Flow-Fill) Cubic Yard ============================================= NH0853-066 US 85C SH 60 TO LASALLE 01/10/08 778.80 100.00 102.86 132.50 STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 6,519.00 120.00 79.09 60.00 STA2873-148 FEDRERAL BLVD (SH 287) AT 70T 02/07/08 40.00 80.00 114.72 111.00 C 0253-202 I-25 02/15/08 40.00 90.00 100.00 100.00 IM0252-393 DENVER - I-25 FROM SANTA FE D 02/28/08 38.00 100.00 178.49 172.20 SHE0702-276 EAGLE COUNTY I-70 MP 171 TO M 03/13/08 10.00 200.00 254.00 242.00 IM0703-327 I-70 SILVERTHORNE TO EJMT 03/20/08 10.00 141.00 163.22 160.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7,435.80 117.56 83.76 69.04 NH 2871-031 US 287 SOUTH OF LAMAR FROM MP 04/03/08 786.00 100.00 117.54 123.24 C 1191-023 FROM MP 0.0 TO MP 2.6 GILPIN 04/03/08 32.00 112.00 192.86 125.00 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 307.00 93.00 140.97 125.00 NH 0503-064 US 50:15TH AND 16TH ST IN CAN 04/17/08 52.00 170.00 142.01 150.00 IM 0705-077 I70 WEST OF BURLINGTON EAST I 04/17/08 840.00 83.00 97.48 86.83 NH0504-056 US 50 PASSING LANES EAST OF 5 05/15/08 276.00 120.00 116.18 150.00 C0503-068 SH 50 PUEBLO CLUB MANOR - PIP 06/26/08 23.00 200.00 146.67 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,316.00 98.02 117.59 114.35 STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 1,099.00 59.00 83.21 73.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,099.00 59.00 83.21 73.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 70 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00065 Str Bkfl (Flow-Fill) Cubic Yard ============================================= C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 584.00 120.00 147.48 150.00 BRS120A-008 ON SH 120 AT MP 2.76 IN FREMO 10/09/08 410.00 150.00 96.73 79.85 STA0853-069 US 85 & COLLINS ST (EATON) 12/04/08 1.00 180.00 291.23 289.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 995.00 132.42 129.11 121.23 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,845.80 109.56 97.76 82.65 =============== 206-00100 Str Bkfl (CL 1) Cubic Yard ============================================= STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 10,590.00 20.00 29.35 26.00 SHE 050A-007 SH 50 BETWEEN MORRIS/FORTINO 01/31/08 810.00 50.00 46.40 50.00 STU 0251-329 S OF COLORADO CITY TO CEDARWO 03/06/08 243.00 70.00 61.30 51.50 IM0703-327 I-70 SILVERTHORNE TO EJMT 03/20/08 12.00 88.00 82.12 106.80 BR 0403-051 US 40 MP 245.85 03/27/08 44.00 55.00 64.00 64.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 11,699.00 23.32 31.49 28.42 NH 2871-031 US 287 SOUTH OF LAMAR FROM MP 04/03/08 1,873.00 30.00 46.67 46.22 C 1191-023 FROM MP 0.0 TO MP 2.6 GILPIN 04/03/08 79.00 41.00 66.00 58.00 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 11,804.00 15.25 31.17 25.50 NH5501-013 US 550 N OF NM STATE LINE, MP 04/10/08 2,420.00 25.00 37.80 23.00 IM 0705-077 I70 WEST OF BURLINGTON EAST I 04/17/08 21,498.00 15.25 23.99 28.41 STA086A-048 INTERSECTION OF SH 86 & COUNT 06/26/08 7.00 150.00 151.00 136.00 STA069A-024 SH 69 HUERFANO COUNTY 06/26/08 1,049.00 50.00 53.09 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 38,730.00 17.59 29.08 28.85 STA R400-147 ON SH 52 IN MORGAN COUNTY 07/24/08 478.00 20.00 29.30 28.50 NH 2854-109 US 285: DEER CREEK INTERCHANG 07/31/08 476.00 31.00 42.86 23.50 STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 79.00 42.00 34.71 19.00 BR R400-206 VARIOUS LOCATIONS IN REGION 4 09/11/08 103.00 45.00 53.34 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,136.00 28.41 35.73 26.79 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 4,561.00 25.00 26.23 23.11 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 71 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00100 Str Bkfl (CL 1) Cubic Yard ============================================= NH1601-058 ON US 160, FROM M.P. 21.40 TO 10/09/08 43.00 70.00 61.20 40.00 BR 0361-088 US36 AND CHERRYVALE RD 10/16/08 4,930.00 26.00 21.13 21.50 SHE 0821-082 SH 82/SMITH WAY - PITKIN 10/16/08 1,230.00 29.00 53.74 44.96 NH 1602-117 THIS PROJECT IS LOCATED ABOUT 12/04/08 318.00 40.00 45.15 66.00 C1601-057 ON U.S. 160, APPROXIMATELY M. 12/04/08 1,434.00 20.00 42.00 25.00 C0063-027 US 6 LOMA STR H-01-E, MP 13.1 12/11/08 131.00 29.00 51.15 41.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 12,647.00 25.78 27.80 26.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 64,212.00 20.44 29.19 28.20 =============== 206-00200 Str Bkfl (CL 2) Cubic Yard ============================================= STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 1,326.00 20.00 17.68 28.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,326.00 20.00 17.68 28.00 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 497.00 16.50 13.77 7.00 NH5501-013 US 550 N OF NM STATE LINE, MP 04/10/08 266.00 25.00 24.83 21.00 IM 0705-077 I70 WEST OF BURLINGTON EAST I 04/17/08 241.00 18.75 17.07 10.23 STA069A-024 SH 69 HUERFANO COUNTY 06/26/08 18.00 36.00 48.76 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,022.00 19.59 16.98 13.04 STA0831-106 PARKER RD. (SH 83) MP 65.5 TO 07/10/08 233.00 20.00 25.47 10.50 STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 10.00 32.00 41.89 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 243.00 20.49 26.06 10.89 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 575.00 15.00 13.00 7.54 BRS120A-008 ON SH 120 AT MP 2.76 IN FREMO 10/09/08 105.00 30.00 28.24 25.44 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 680.00 17.32 14.98 10.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,271.00 19.35 17.29 18.38 =============== 206-00360 Mechanical Reinforcement of Soil Cubic Yard ============================================= STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 5,039.00 20.00 20.57 19.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,039.00 20.00 20.57 19.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 72 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00360 Mechanical Reinforcement of Soil Cubic Yard ============================================= IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 8,296.00 15.25 25.25 24.00 NH5501-013 US 550 N OF NM STATE LINE, MP 04/10/08 2,165.00 30.00 28.08 27.00 IM 0705-077 I70 WEST OF BURLINGTON EAST I 04/17/08 5,296.00 19.50 17.65 14.50 STA086A-048 INTERSECTION OF SH 86 & COUNT 06/26/08 35.00 75.00 107.88 81.50 STA069A-024 SH 69 HUERFANO COUNTY 06/26/08 1,049.00 20.00 47.10 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16,841.00 18.90 24.53 23.45 NH 2854-109 US 285: DEER CREEK INTERCHANG 07/31/08 476.00 27.00 29.02 72.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 476.00 27.00 29.02 72.00 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 1,200.00 30.00 37.50 35.63 BR 0361-088 US36 AND CHERRYVALE RD 10/16/08 2,870.00 23.00 28.25 27.43 SHE 0821-082 SH 82/SMITH WAY - PITKIN 10/16/08 765.00 28.00 57.93 50.73 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,835.00 25.53 34.11 33.15 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 27,191.00 20.43 26.12 25.20 =============== 206-00505 Filter Matl (Spec) Cubic Yard ============================================= STA 0831-099 SH 83 AT RUSSELLVILLE ROAD SO 01/17/08 95.00 40.00 74.07 70.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 95.00 40.00 74.07 70.00 C 067A-026 SH67 AND CR81 04/10/08 509.00 40.00 48.43 38.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 509.00 40.00 48.43 38.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 604.00 40.00 54.33 43.03 =============== 206-00510 Filter Matl (CL A) Cubic Yard ============================================= STA 0831-099 SH 83 AT RUSSELLVILLE ROAD SO 01/17/08 32.00 68.00 62.52 66.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 32.00 68.00 62.52 66.25 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 73 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-00510 Filter Matl (CL A) Cubic Yard ============================================= IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 74.00 47.00 62.32 50.00 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 79.00 60.00 71.00 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 153.00 53.71 64.60 70.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 185.00 56.18 64.14 69.89 =============== 206-00520 Filter Matl (CL B) Cubic Yard ============================================= STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 592.00 60.00 68.92 50.00 HB 0131-050 SH 13 NORTH OF RIFLE 02/07/08 1,550.00 60.00 66.11 62.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,142.00 60.00 66.68 58.68 NH5501-013 US 550 N OF NM STATE LINE, MP 04/10/08 22.00 50.00 85.27 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 22.00 50.00 85.27 30.00 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 300.00 60.00 46.71 24.70 C1601-057 ON U.S. 160, APPROXIMATELY M. 12/04/08 13.00 50.00 120.61 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 313.00 59.58 48.42 29.90 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,477.00 59.86 62.78 54.79 =============== 206-01000 Bed Course Matl Cubic Yard ============================================= NH 1603-025 US 160 ALAMOSA MILL AND FILL 03/27/08 92.00 36.00 41.08 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 92.00 36.00 41.08 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 92.00 36.00 41.08 50.00 =============== 206-01750 Shoring LUMP SUM =============================================== HB 0131-050 SH 13 NORTH OF RIFLE 02/07/08 1.00 135000.00 165741.00 20000.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 74 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-01750 Shoring LUMP SUM =============================================== STU 0251-329 S OF COLORADO CITY TO CEDARWO 03/06/08 1.00 50000.00 31150.18 25750.92 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 92500.00 104563.36 22875.46 STA069A-024 SH 69 HUERFANO COUNTY 06/26/08 1.00 8000.00 13694.60 10000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 8000.00 13694.60 10000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 64333.33 85091.48 18583.64 =============== 206-01781 Shoring (A 1) LUMP SUM =============================================== STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 1.00 10000.00 26916.07 34600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 10000.00 26916.07 34600.00 NH 2871-031 US 287 SOUTH OF LAMAR FROM MP 04/03/08 1.00 30000.00 12266.68 12324.00 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 1.00 85000.00 80956.75 66000.00 NH5501-013 US 550 N OF NM STATE LINE, MP 04/10/08 1.00 35000.00 15721.28 11000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 50000.00 47763.25 29774.67 STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 1.00 18000.00 11155.54 9100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 18000.00 11155.54 9100.00 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 1.00 16000.00 49113.96 95000.00 SHE 0821-082 SH 82/SMITH WAY - PITKIN 10/16/08 1.00 10000.00 12750.00 30000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 13000.00 39416.90 62500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 29142.86 37198.75 36860.57 =============== 206-01782 Shoring (A 2) LUMP SUM =============================================== STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 1.00 15000.00 20541.17 38500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 15000.00 20541.17 38500.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 75 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-01782 Shoring (A 2) LUMP SUM =============================================== IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 1.00 45000.00 23525.20 7500.00 NH5501-013 US 550 N OF NM STATE LINE, MP 04/10/08 1.00 35000.00 15721.28 11000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 40000.00 20403.64 9250.00 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 1.00 24000.00 61906.90 93000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 24000.00 61906.90 93000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 29750.00 35639.84 37500.00 =============== 206-01783 Shoring (A 3) LUMP SUM =============================================== IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 1.00 70000.00 22266.57 7500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 70000.00 22266.57 7500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 70000.00 22266.57 7500.00 =============== 206-01784 Shoring (A 4) LUMP SUM =============================================== IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 1.00 29500.00 25491.13 40000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 29500.00 25491.13 40000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 29500.00 25491.13 40000.00 =============== 206-01785 Shoring (A 5) LUMP SUM =============================================== IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 1.00 75000.00 25713.35 40000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 75000.00 25713.35 40000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 75000.00 25713.35 40000.00 =============== 206-01786 Shoring (A 6) LUMP SUM =============================================== IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 1.00 20000.00 21224.46 7500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 20000.00 21224.46 7500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 20000.00 21224.46 7500.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 76 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 206-01787 Shoring (A 7) LUMP SUM =============================================== IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 1.00 29500.00 21224.46 7500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 29500.00 21224.46 7500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 29500.00 21224.46 7500.00 =============== 206-01788 Shoring (A 8) LUMP SUM =============================================== IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 1.00 19000.00 19404.86 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 19000.00 19404.86 500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 19000.00 19404.86 500.00 =============== 206-01789 Shoring (A 9) LUMP SUM =============================================== IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 1.00 19000.00 18218.77 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 19000.00 18218.77 500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 19000.00 18218.77 500.00 =============== 207-00205 Topsoil Cubic Yard ============================================= HB131A-033 SH 131 ROUTT COUNTY 01/10/08 5,760.00 8.00 9.41 15.00 STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 67,037.00 8.00 4.23 3.10 STA 0831-099 SH 83 AT RUSSELLVILLE ROAD SO 01/17/08 865.00 25.00 8.50 11.65 STA 093A-007 ON SH 93 IN BOULDER COUNTY 01/24/08 145.00 10.00 37.24 70.00 CCR600-303 CHATFIELD STATE PARK MAIN RD, 01/31/08 403.00 15.00 20.72 14.00 STA 017A-010 BEGINNING OF SH 17 FROM MP 69 02/14/08 3,835.00 13.00 15.56 12.70 STA0252-397 I25 NORTHGATE NORTH 02/14/08 3,375.00 12.00 14.01 10.53 STU 0251-329 S OF COLORADO CITY TO CEDARWO 03/06/08 1,363.00 12.00 22.58 18.88 SHE0702-276 EAGLE COUNTY I-70 MP 171 TO M 03/13/08 1,291.00 7.00 24.48 30.00 SRP083A-032 HIGHWAY 83 AND HODGEN IN EL P 03/20/08 9.00 100.00 82.94 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 84,083.00 8.66 6.46 5.58 NH 2871-031 US 287 SOUTH OF LAMAR FROM MP 04/03/08 33,837.00 5.00 6.15 5.31 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 77 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 207-00205 Topsoil Cubic Yard ============================================= C 1191-023 FROM MP 0.0 TO MP 2.6 GILPIN 04/03/08 250.00 29.00 65.07 17.00 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 10,200.00 7.50 6.80 3.50 NH5501-013 US 550 N OF NM STATE LINE, MP 04/10/08 4,600.00 7.75 8.81 4.00 C 067A-026 SH67 AND CR81 04/10/08 1,192.00 14.00 12.65 11.00 NH 0503-064 US 50:15TH AND 16TH ST IN CAN 04/17/08 93.00 30.00 47.43 50.00 SHE 2854-114 SH 285-BRADEY CT. 05/01/08 32.00 30.00 81.99 45.00 NH0504-056 US 50 PASSING LANES EAST OF 5 05/15/08 7,255.00 10.00 6.60 4.00 STA0703-334 I-70 FROM BAKERVILLE TO EAST 05/15/08 2,462.00 13.25 6.93 3.15 SHE 0761-195 I-76: BURLINGTON CANAL TO BRO 05/15/08 1,529.00 17.25 24.02 30.00 STS 1151-021 SH 115 AT CR F45 IN FREMONT C 05/15/08 223.00 20.00 23.91 18.60 SHE3921-008 SH 392 @ WCR 31(HES) 06/19/08 505.00 8.00 13.90 9.00 STA 069A-023 SH 69 WESTCLIFFE AREA - CUSTE 06/26/08 1,254.00 14.00 10.17 8.00 STA069A-024 SH 69 HUERFANO COUNTY 06/26/08 607.20 20.00 18.54 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 64,039.20 7.48 8.03 5.84 STA0831-106 PARKER RD. (SH 83) MP 65.5 TO 07/10/08 125.00 35.00 28.25 21.50 SHE R600-310 US285/FED, I-25/120TH, I-270/ 08/14/08 150.00 31.00 37.56 45.80 STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 1,000.00 14.75 21.64 23.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,275.00 18.65 23.76 25.54 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 30,000.00 5.00 3.60 2.22 BRS120A-008 ON SH 120 AT MP 2.76 IN FREMO 10/09/08 634.00 15.00 13.16 10.89 BR 0361-088 US36 AND CHERRYVALE RD 10/16/08 757.00 8.00 12.89 3.00 SHE 0451-009 SH45 (PUEBLO BLVD) AND RED CR 12/04/08 29.00 20.00 40.30 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 31,420.00 5.29 3.92 2.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 180,817.20 7.73 6.24 5.27 =============== 207-00210 Stockpile Topsoil Cubic Yard ============================================= STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 77,763.00 4.50 2.02 2.20 STA 0831-099 SH 83 AT RUSSELLVILLE ROAD SO 01/17/08 865.00 6.25 6.58 11.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 78,628.00 4.52 2.12 2.30 C 1191-023 FROM MP 0.0 TO MP 2.6 GILPIN 04/03/08 250.00 6.00 58.93 17.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 78 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 207-00210 Stockpile Topsoil Cubic Yard ============================================= STA0703-334 I-70 FROM BAKERVILLE TO EAST 05/15/08 2,462.00 7.00 4.50 2.50 C0702-275 I-70 VAIL PASS 06/26/08 104.00 14.00 23.50 10.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,816.00 7.17 11.63 4.08 NH 2854-109 US 285: DEER CREEK INTERCHANG 07/31/08 4,168.00 5.00 7.97 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,168.00 5.00 7.97 5.00 BR 0361-088 US36 AND CHERRYVALE RD 10/16/08 757.00 6.00 11.39 5.50 NH 1602-117 THIS PROJECT IS LOCATED ABOUT 12/04/08 390.00 10.00 29.02 51.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,147.00 7.36 15.40 20.97 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 86,759.00 4.67 3.15 2.74 =============== 207-00305 Wetland Topsoil Cubic Yard ============================================= STA 017A-010 BEGINNING OF SH 17 FROM MP 69 02/14/08 536.00 15.00 12.84 7.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 536.00 15.00 12.84 7.50 C 067A-026 SH67 AND CR81 04/10/08 220.00 20.00 17.39 20.00 IM 0705-077 I70 WEST OF BURLINGTON EAST I 04/17/08 370.00 14.00 20.54 16.44 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 442.00 12.00 37.00 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,032.00 14.42 24.83 25.15 STA R400-147 ON SH 52 IN MORGAN COUNTY 07/24/08 272.00 13.00 12.40 7.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 272.00 13.00 12.40 7.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,840.00 14.38 18.01 17.40 =============== 207-00310 Stockpile Wetland Topsoil Cubic Yard ============================================= STA 017A-010 BEGINNING OF SH 17 FROM MP 69 02/14/08 536.00 15.00 14.28 12.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 536.00 15.00 14.28 12.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 79 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 207-00310 Stockpile Wetland Topsoil Cubic Yard ============================================= STA R400-147 ON SH 52 IN MORGAN COUNTY 07/24/08 272.00 13.00 8.75 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 272.00 13.00 8.75 4.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 808.00 14.33 11.49 9.64 =============== 208-00002 Erosion Log (12 In) Lin Foot =============================================== NH0853-066 US 85C SH 60 TO LASALLE 01/10/08 1,500.00 5.00 3.76 4.50 STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 1,060.00 6.00 6.63 4.70 IM0701-189 PALISADE EAST 01/17/08 23,680.00 6.00 4.76 4.95 STA 0831-099 SH 83 AT RUSSELLVILLE ROAD SO 01/17/08 500.00 7.00 5.51 4.65 IM 0252-392 I-25, TOMAH ROAD TO DOUGLAS L 01/17/08 1,900.00 6.25 4.81 4.90 STA 093A-007 ON SH 93 IN BOULDER COUNTY 01/24/08 1,000.00 5.00 4.84 4.70 C0253-199 I25 RUBBILIZATION N OF SH 56 01/24/08 2,500.00 4.20 5.98 5.50 ITS0361-087 US 36 (FEDERAL BLVD TO BOULDE 01/31/08 50.00 35.00 7.41 4.50 CCR600-303 CHATFIELD STATE PARK MAIN RD, 01/31/08 2,500.00 5.00 4.44 3.90 SHE 050A-007 SH 50 BETWEEN MORRIS/FORTINO 01/31/08 1,000.00 6.00 8.13 5.00 NH0342-048 US 34 IN WELD COUNTY 02/07/08 100.00 5.00 4.72 4.50 NH 2851-004 US 285 RESURFACE FROM NEW MEX 02/07/08 200.00 10.00 9.54 4.16 C 5502-063 US 550 SILVERTON TO RED MTN P 02/07/08 700.00 8.00 9.05 11.00 STA2873-148 FEDRERAL BLVD (SH 287) AT 70T 02/07/08 100.00 10.00 6.25 6.00 HB 0131-050 SH 13 NORTH OF RIFLE 02/07/08 250.00 8.00 6.39 7.00 SHE0741-016 THE INTERSECTION OF SH 74 AND 02/14/08 100.00 9.50 7.15 5.00 NH 1602-116 SOUTH FORK EAST 02/14/08 400.00 8.75 10.37 4.46 STA 079A-011 SH40 / SH79, SH40 (309.26-31 02/28/08 300.00 6.50 4.39 4.34 STU 0251-329 S OF COLORADO CITY TO CEDARWO 03/06/08 1,415.00 8.00 6.86 4.02 HB0132-017 SH13 WY STATE LINE SOUTH OVER 03/13/08 14,200.00 6.00 5.20 4.00 SHE0702-276 EAGLE COUNTY I-70 MP 171 TO M 03/13/08 790.00 6.00 11.00 12.00 STA 072A-030 SH 72, 64TH AVE TO 84TH PKWY 03/13/08 500.00 6.00 4.26 3.75 IM0703-327 I-70 SILVERTHORNE TO EJMT 03/20/08 200.00 9.25 10.03 10.65 STA052A-029 ON SH 52 IN WELD COUNTY 03/20/08 20.00 7.00 14.10 13.54 STA1251-006 WINDY GAP RES-GRAND COUNTY 03/27/08 200.00 8.20 5.48 5.00 BR 0403-051 US 40 MP 245.85 03/27/08 200.00 7.50 4.25 4.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 55,365.00 6.03 5.19 4.82 NH 2871-031 US 287 SOUTH OF LAMAR FROM MP 04/03/08 914.00 7.00 4.99 4.88 C 1191-023 FROM MP 0.0 TO MP 2.6 GILPIN 04/03/08 4,120.00 4.75 6.41 5.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 80 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00002 Erosion Log (12 In) Lin Foot =============================================== IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 12,000.00 4.25 4.67 3.25 C 067A-026 SH67 AND CR81 04/10/08 475.00 5.00 5.47 5.00 STA 0343-026 ON US 34 IN YUMA COUNTY 04/17/08 10.00 10.00 12.17 10.50 IM 0705-077 I70 WEST OF BURLINGTON EAST I 04/17/08 25,000.00 4.00 5.01 4.04 IM 0702-281 I-70 IN DOWD CANYON 04/30/08 1,600.00 16.50 8.59 15.36 STA 009A-001 SH 9 HOOSIER PASS NORTH - PHA 05/01/08 2,000.00 6.75 6.31 5.00 SHE 2854-114 SH 285-BRADEY CT. 05/01/08 10.00 15.00 6.08 6.00 NH0504-056 US 50 PASSING LANES EAST OF 5 05/15/08 2,100.00 6.00 4.63 4.45 STA0703-334 I-70 FROM BAKERVILLE TO EAST 05/15/08 3,000.00 5.75 4.61 3.95 C0703-337 I-70 EMPIRE JCT. EAST OVERLAY 06/05/08 300.00 5.25 4.85 5.00 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 4,074.00 5.00 5.83 6.00 IM 070A-003 I 70 BETWEEN DENVER AND VAIL 06/12/08 4,170.00 6.00 6.00 5.00 C0703-330 I-70 TWIN TUNNELS WESTBOUND 06/12/08 400.00 5.50 6.64 8.00 C119A-054 SH 119 FROM MP 6.5 TO MP 8.0 06/19/08 800.00 7.00 4.86 4.10 SHE3921-008 SH 392 @ WCR 31(HES) 06/19/08 32.00 20.00 9.27 5.50 STA086A-048 INTERSECTION OF SH 86 & COUNT 06/26/08 220.00 8.00 9.09 7.60 STA069A-024 SH 69 HUERFANO COUNTY 06/26/08 280.00 10.00 7.53 7.00 SHE0091-033 SH9 SIGNAL INTERCONNECT 06/26/08 200.00 8.50 6.23 2.30 C0702-275 I-70 VAIL PASS 06/26/08 1,840.00 12.00 5.38 5.00 STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 17,720.00 3.85 4.00 4.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 81,265.00 4.94 4.80 4.49 STA R400-147 ON SH 52 IN MORGAN COUNTY 07/24/08 450.00 5.50 4.83 4.25 SHE0831-102 PARKER RD: LONG AVE INTERSECT 07/24/08 250.00 7.00 5.06 4.25 NH 2854-109 US 285: DEER CREEK INTERCHANG 07/31/08 4,320.00 5.50 5.16 4.50 SHE R600-310 US285/FED, I-25/120TH, I-270/ 08/14/08 50.00 8.75 8.78 8.42 STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 50.00 9.50 6.43 6.25 C0702-284 I-70 TRUCK PARKING AT DOTSERO 09/11/08 3,225.00 10.00 4.62 4.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8,345.00 7.33 4.98 4.61 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 31,520.00 4.50 3.94 3.39 BRS120A-008 ON SH 120 AT MP 2.76 IN FREMO 10/09/08 500.00 6.00 5.90 5.64 NH1601-058 ON US 160, FROM M.P. 21.40 TO 10/09/08 800.00 7.00 14.74 39.00 BR 0361-088 US36 AND CHERRYVALE RD 10/16/08 350.00 6.00 3.23 2.81 C0063-027 US 6 LOMA STR H-01-E, MP 13.1 12/11/08 400.00 5.00 6.06 4.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 33,570.00 4.60 4.10 4.28 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 178,545.00 5.33 4.69 4.56 =============== 208-00003 Erosion Log (18 In) Lin Foot =============================================== NH5501-013 US 550 N OF NM STATE LINE, MP 04/10/08 3,400.00 9.00 8.39 5.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 81 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00003 Erosion Log (18 In) Lin Foot =============================================== STA 009A-001 SH 9 HOOSIER PASS NORTH - PHA 05/01/08 200.00 10.25 10.04 8.50 NH0063-024 US 6 EAGLE 05/22/08 500.00 6.00 14.40 15.00 C 090A-002 ON S.H. 90 FROM M.P. 10.6 TO 05/22/08 400.00 10.00 10.96 7.87 C 1601-060 US 160 MONTEZUMA COUNTY 06/26/08 550.00 10.00 9.70 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,050.00 8.94 9.06 7.13 STA0831-106 PARKER RD. (SH 83) MP 65.5 TO 07/10/08 200.00 9.75 4.26 3.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 200.00 9.75 4.26 3.10 NH 1602-117 THIS PROJECT IS LOCATED ABOUT 12/04/08 800.00 10.00 7.66 4.80 C1601-057 ON U.S. 160, APPROXIMATELY M. 12/04/08 2,320.00 6.00 9.94 5.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,120.00 7.03 9.51 5.32 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,370.00 8.25 9.06 6.36 =============== 208-00004 Silt Berm Lin Foot =============================================== IM 0705-077 I70 WEST OF BURLINGTON EAST I 04/17/08 1,000.00 7.25 7.79 13.29 SHE 0761-195 I-76: BURLINGTON CANAL TO BRO 05/15/08 1,066.00 10.00 7.83 11.37 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,066.00 8.67 7.82 12.30 NH 2854-109 US 285: DEER CREEK INTERCHANG 07/31/08 198.00 7.50 12.36 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 198.00 7.50 12.36 12.00 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 1,010.00 12.00 7.61 3.39 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,010.00 12.00 7.61 3.39 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,274.00 9.63 7.95 9.53 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 82 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00005 Erosion Log Lin Foot =============================================== HB131A-033 SH 131 ROUTT COUNTY 01/10/08 23,193.00 3.00 5.37 4.70 NH 160A-002 DOUBLE TREE BRIDGE ( O-05-AJ) 01/17/08 100.00 10.00 21.00 12.00 STA 017A-010 BEGINNING OF SH 17 FROM MP 69 02/14/08 240.00 10.00 8.54 5.50 C 0702-274 FRISCO (MM 201) TO EAST VAIL 03/06/08 9,360.00 4.25 6.43 10.00 NH 1603-025 US 160 ALAMOSA MILL AND FILL 03/27/08 200.00 8.00 6.41 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 33,093.00 3.46 5.63 6.25 NH 0503-064 US 50:15TH AND 16TH ST IN CAN 04/17/08 620.00 6.50 7.27 7.00 STA009A-025 SH9 FROM FAIRPLAY TO HARTSEL 05/01/08 9,800.00 5.00 4.27 4.55 EPSW00-541 DENVER AREA; SH 6, I-25, I-70 05/08/08 200.00 9.00 28.57 7.20 STS 1151-021 SH 115 AT CR F45 IN FREMONT C 05/15/08 700.00 5.50 6.96 4.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 11,320.00 5.18 5.10 4.71 STPR600-311 SH 72 FROM I-70 TO 86TH AVE 07/10/08 200.00 10.25 12.60 15.00 STA 0404-044 WEST COLFAX AVE. (US 40) FROM 07/17/08 210.00 9.00 4.74 4.74 BRS R200-154 I-25 MP 59.09, MP 65.6, MP 79 09/04/08 500.00 7.00 7.13 6.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 910.00 8.18 7.84 7.96 PLH 150A-007 INTERSECTION OF US 160 & SH 1 10/09/08 1,200.00 5.00 6.88 7.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,200.00 5.00 6.88 7.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 46,523.00 4.01 5.60 5.93 =============== 208-00007 Erosion Log (8 In) Lin Foot =============================================== STA133A-034 133/187 RESURFACING 01/03/08 100.00 8.00 41.67 100.00 HB135A-024 SH 135 CRESTED BUTTE SOUTH 02/14/08 250.00 10.00 14.15 20.00 SRP083A-032 HIGHWAY 83 AND HODGEN IN EL P 03/20/08 40.00 10.00 10.43 7.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 390.00 9.49 18.51 39.23 SHE 0501-056 US 50 AND 28.5 RD IN GRAND JU 04/10/08 940.00 5.00 6.25 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 940.00 5.00 6.25 5.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 83 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00007 Erosion Log (8 In) Lin Foot =============================================== SHE 0821-082 SH 82/SMITH WAY - PITKIN 10/16/08 650.00 5.50 5.50 10.00 SHE 0451-009 SH45 (PUEBLO BLVD) AND RED CR 12/04/08 100.00 8.00 7.41 4.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 750.00 5.83 5.81 9.31 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,080.00 6.14 8.70 12.97 =============== 208-00010 Erosion Bales Each =================================================== HB131A-033 SH 131 ROUTT COUNTY 01/10/08 254.00 25.00 33.92 43.00 STA1251-006 WINDY GAP RES-GRAND COUNTY 03/27/08 20.00 20.00 39.50 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 274.00 24.64 34.09 42.05 C0703-330 I-70 TWIN TUNNELS WESTBOUND 06/12/08 20.00 30.00 60.19 111.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20.00 30.00 60.19 111.00 NH 2854-109 US 285: DEER CREEK INTERCHANG 07/31/08 20.00 27.00 37.90 14.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20.00 27.00 37.90 14.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 314.00 25.13 35.11 44.69 =============== 208-00011 Erosion Bales (Weed Free) Each =================================================== NH0853-066 US 85C SH 60 TO LASALLE 01/10/08 10.00 16.00 13.68 15.00 C0253-199 I25 RUBBILIZATION N OF SH 56 01/24/08 5.00 19.96 45.17 21.50 HB 0131-050 SH 13 NORTH OF RIFLE 02/07/08 40.00 20.00 28.58 35.00 STA0252-397 I25 NORTHGATE NORTH 02/14/08 325.00 20.00 16.71 17.52 STU 0251-329 S OF COLORADO CITY TO CEDARWO 03/06/08 6.00 20.00 18.09 15.45 HB0132-017 SH13 WY STATE LINE SOUTH OVER 03/13/08 70.00 20.00 20.31 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 456.00 19.91 19.38 18.78 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 84 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00011 Erosion Bales (Weed Free) Each =================================================== NH 2871-031 US 287 SOUTH OF LAMAR FROM MP 04/03/08 1,054.00 15.00 12.39 12.32 NH 0503-064 US 50:15TH AND 16TH ST IN CAN 04/17/08 12.00 30.00 36.60 20.00 STA 0343-026 ON US 34 IN YUMA COUNTY 04/17/08 10.00 20.00 32.00 25.00 IM 0705-077 I70 WEST OF BURLINGTON EAST I 04/17/08 1,850.00 13.75 17.42 18.10 NH0504-056 US 50 PASSING LANES EAST OF 5 05/15/08 120.00 17.00 16.99 14.00 STS 1151-021 SH 115 AT CR F45 IN FREMONT C 05/15/08 6.00 25.00 37.42 24.00 STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 100.00 15.00 16.59 16.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,152.00 14.43 16.35 16.00 STA 0404-044 WEST COLFAX AVE. (US 40) FROM 07/17/08 26.00 22.00 16.89 13.39 STA R400-147 ON SH 52 IN MORGAN COUNTY 07/24/08 100.00 18.00 18.71 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 126.00 18.83 18.40 15.46 BR 0361-088 US36 AND CHERRYVALE RD 10/16/08 50.00 18.00 14.31 12.50 NH 1602-117 THIS PROJECT IS LOCATED ABOUT 12/04/08 100.00 20.00 35.46 48.00 C1601-057 ON U.S. 160, APPROXIMATELY M. 12/04/08 928.00 19.00 17.90 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,078.00 19.05 18.81 16.22 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,812.00 16.10 17.34 16.30 =============== 208-00015 Sand Bag Each =================================================== STA 009A-001 SH 9 HOOSIER PASS NORTH - PHA 05/01/08 200.00 16.00 15.00 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 200.00 16.00 15.00 10.00 STA0831-106 PARKER RD. (SH 83) MP 65.5 TO 07/10/08 20.00 9.75 10.84 6.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20.00 9.75 10.84 6.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 220.00 15.43 14.31 9.69 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 85 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00018 Gravel Bag Lin Foot =============================================== HB0403-052 US40 BERTHOUD PASS 04/24/08 100.00 25.00 26.22 13.00 STA086A-048 INTERSECTION OF SH 86 & COUNT 06/26/08 30.00 7.00 11.18 8.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 130.00 20.85 22.74 12.01 SHE R600-310 US285/FED, I-25/120TH, I-270/ 08/14/08 50.00 17.75 10.73 9.16 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 50.00 17.75 10.73 9.16 IMR600-322 I-25: COUNTY LINE RD TO BELLE 10/09/08 100.00 9.50 29.73 10.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 100.00 9.50 29.73 10.90 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 280.00 16.24 22.56 11.10 =============== 208-00020 Silt Fence Lin Foot =============================================== STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 18,684.00 3.00 1.64 1.10 STA 0831-099 SH 83 AT RUSSELLVILLE ROAD SO 01/17/08 2,225.00 2.00 1.57 1.10 STA 093A-007 ON SH 93 IN BOULDER COUNTY 01/24/08 20.00 2.00 1.94 1.30 C0253-199 I25 RUBBILIZATION N OF SH 56 01/24/08 20.00 2.19 18.17 2.15 CCR600-303 CHATFIELD STATE PARK MAIN RD, 01/31/08 3,300.00 2.50 1.29 0.95 NH 2851-004 US 285 RESURFACE FROM NEW MEX 02/07/08 200.00 6.00 4.45 1.30 C 5502-063 US 550 SILVERTON TO RED MTN P 02/07/08 1,000.00 2.50 5.76 11.00 HB 0131-050 SH 13 NORTH OF RIFLE 02/07/08 800.00 2.50 2.12 3.00 STA 017A-010 BEGINNING OF SH 17 FROM MP 69 02/14/08 13,350.00 2.00 2.72 2.50 SHE0741-016 THE INTERSECTION OF SH 74 AND 02/14/08 100.00 3.50 2.52 1.50 STA0252-397 I25 NORTHGATE NORTH 02/14/08 5,500.00 3.00 1.30 1.31 NH 1602-116 SOUTH FORK EAST 02/14/08 400.00 3.50 4.33 1.31 IM0252-393 DENVER - I-25 FROM SANTA FE D 02/28/08 500.00 2.50 1.43 1.20 STU 0251-329 S OF COLORADO CITY TO CEDARWO 03/06/08 4,450.00 2.40 1.46 0.67 STA 072A-030 SH 72, 64TH AVE TO 84TH PKWY 03/13/08 1,500.00 2.00 1.06 1.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 52,049.00 2.58 1.95 1.66 NH 2871-031 US 287 SOUTH OF LAMAR FROM MP 04/03/08 2,575.00 1.75 1.07 1.03 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 86 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00020 Silt Fence Lin Foot =============================================== IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 8,500.00 1.85 1.71 1.50 NH5501-013 US 550 N OF NM STATE LINE, MP 04/10/08 4,500.00 2.50 3.23 3.80 C 067A-026 SH67 AND CR81 04/10/08 26,000.00 2.00 1.13 0.90 NH 0503-064 US 50:15TH AND 16TH ST IN CAN 04/17/08 120.00 3.00 5.35 1.70 IM 0705-077 I70 WEST OF BURLINGTON EAST I 04/17/08 10,000.00 2.20 1.83 2.67 STA 009A-001 SH 9 HOOSIER PASS NORTH - PHA 05/01/08 500.00 2.60 2.38 1.25 SHE 2854-114 SH 285-BRADEY CT. 05/01/08 400.00 2.00 1.79 2.00 NH0504-056 US 50 PASSING LANES EAST OF 5 05/15/08 5,500.00 2.50 1.35 1.10 C 090A-002 ON S.H. 90 FROM M.P. 10.6 TO 05/22/08 4,500.00 3.00 2.25 1.05 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 5,636.00 2.50 1.77 1.25 IM 070A-003 I 70 BETWEEN DENVER AND VAIL 06/12/08 6,361.00 1.50 7.25 1.50 C119A-054 SH 119 FROM MP 6.5 TO MP 8.0 06/19/08 3,120.00 2.00 1.35 1.00 STA 069A-023 SH 69 WESTCLIFFE AREA - CUSTE 06/26/08 22,800.00 2.00 1.61 1.50 STA069A-024 SH 69 HUERFANO COUNTY 06/26/08 300.00 2.00 3.60 4.50 STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 2,770.00 2.00 1.07 0.87 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 103,582.00 2.09 1.72 1.47 STA0831-106 PARKER RD. (SH 83) MP 65.5 TO 07/10/08 1,800.00 2.10 1.39 1.00 STA 0404-044 WEST COLFAX AVE. (US 40) FROM 07/17/08 4,540.00 2.30 1.09 1.13 STA R400-147 ON SH 52 IN MORGAN COUNTY 07/24/08 500.00 2.00 1.39 0.75 SHE0831-102 PARKER RD: LONG AVE INTERSECT 07/24/08 700.00 2.50 1.08 0.85 NH 2854-109 US 285: DEER CREEK INTERCHANG 07/31/08 2,400.00 2.05 1.66 1.15 SHE R600-310 US285/FED, I-25/120TH, I-270/ 08/14/08 2,200.00 2.10 1.83 2.29 STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 1,000.00 1.80 1.51 1.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 13,140.00 2.15 1.36 1.28 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 18,335.00 1.50 1.35 1.14 BRS120A-008 ON SH 120 AT MP 2.76 IN FREMO 10/09/08 1,300.00 2.50 1.80 1.58 NH1601-058 ON US 160, FROM M.P. 21.40 TO 10/09/08 500.00 3.00 4.68 10.00 PLH 150A-007 INTERSECTION OF US 160 & SH 1 10/09/08 300.00 1.50 3.75 2.50 BR 0361-088 US36 AND CHERRYVALE RD 10/16/08 4,000.00 2.00 1.24 0.90 NH 1602-117 THIS PROJECT IS LOCATED ABOUT 12/04/08 3,260.00 4.00 3.09 0.90 C1601-057 ON U.S. 160, APPROXIMATELY M. 12/04/08 1,615.00 2.50 4.06 3.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 29,310.00 1.97 1.58 1.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 198,081.00 2.21 1.71 1.50 =============== 208-00021 Silt Fence (Reinf) Lin Foot =============================================== NH 160A-002 DOUBLE TREE BRIDGE ( O-05-AJ) 01/17/08 100.00 10.00 5.50 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 100.00 10.00 5.50 3.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 87 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00021 Silt Fence (Reinf) Lin Foot =============================================== C 1601-060 US 160 MONTEZUMA COUNTY 06/26/08 400.00 6.00 6.85 2.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 400.00 6.00 6.85 2.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 500.00 6.80 6.73 2.60 =============== 208-00030 Sediment Basin Each =================================================== BR 0403-051 US 40 MP 245.85 03/27/08 1.00 1900.00 2200.00 2200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1900.00 2200.00 2200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1900.00 2200.00 2200.00 =============== 208-00033 Sediment Trap Each =================================================== C1601-057 ON U.S. 160, APPROXIMATELY M. 12/04/08 15.00 1500.00 802.37 980.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 15.00 1500.00 802.37 980.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15.00 1500.00 802.37 980.00 =============== 208-00034 Gravel Bag Lin Foot =============================================== STA 0831-099 SH 83 AT RUSSELLVILLE ROAD SO 01/17/08 100.00 12.00 10.61 6.75 STA 079A-011 SH40 / SH79, SH40 (309.26-31 02/28/08 100.00 12.50 9.59 7.59 C 0702-274 FRISCO (MM 201) TO EAST VAIL 03/06/08 680.00 4.25 17.09 30.00 IM0703-327 I-70 SILVERTHORNE TO EJMT 03/20/08 300.00 12.50 15.35 16.00 BR 0403-051 US 40 MP 245.85 03/27/08 100.00 8.00 12.00 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,280.00 7.73 14.51 21.75 C 1191-023 FROM MP 0.0 TO MP 2.6 GILPIN 04/03/08 200.00 12.50 11.33 8.00 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 1,600.00 2.50 5.70 2.62 NH 030A-026 SH30 1ST AVE AT HAVANA ST TO 04/17/08 500.00 7.00 9.61 10.30 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 88 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00034 Gravel Bag Lin Foot =============================================== IM 0705-077 I70 WEST OF BURLINGTON EAST I 04/17/08 1,000.00 6.75 7.49 8.24 STA0703-334 I-70 FROM BAKERVILLE TO EAST 05/15/08 100.00 25.00 6.48 7.40 IM 070A-003 I 70 BETWEEN DENVER AND VAIL 06/12/08 50.00 6.00 20.25 12.50 C119A-054 SH 119 FROM MP 6.5 TO MP 8.0 06/19/08 24.00 12.00 5.96 3.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,474.00 5.71 6.94 5.94 NH 2854-109 US 285: DEER CREEK INTERCHANG 07/31/08 200.00 10.00 7.11 4.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 200.00 10.00 7.11 4.50 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 400.00 15.00 7.67 4.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 400.00 15.00 7.67 4.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,354.00 7.05 8.32 9.56 =============== 208-00040 Check Dam Each =================================================== STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 9.00 350.00 448.42 310.00 STA0252-397 I25 NORTHGATE NORTH 02/14/08 6.00 700.00 766.45 1144.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15.00 490.00 554.43 643.74 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 10.00 276.00 665.72 95.00 C 067A-026 SH67 AND CR81 04/10/08 150.00 600.00 116.41 60.00 STA 009A-001 SH 9 HOOSIER PASS NORTH - PHA 05/01/08 1.00 604.00 871.25 380.00 SHE3921-008 SH 392 @ WCR 31(HES) 06/19/08 2.00 300.00 377.50 165.00 STA 069A-023 SH 69 WESTCLIFFE AREA - CUSTE 06/26/08 48.00 600.00 79.99 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 211.00 581.82 159.16 64.17 STA0831-106 PARKER RD. (SH 83) MP 65.5 TO 07/10/08 3.00 712.00 716.98 618.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 712.00 716.98 618.80 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 89 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00040 Check Dam Each =================================================== C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 88.00 500.00 309.97 110.00 SHE 0821-082 SH 82/SMITH WAY - PITKIN 10/16/08 10.00 600.00 460.00 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 98.00 510.20 315.92 211.02 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 327.00 557.34 247.49 139.85 =============== 208-00045 Conc Washout Str Each =================================================== STA139A-029 N OF DOUGLAS PASS CHIP SEALS 01/03/08 1.00 1000.00 250.75 1.00 NH0853-066 US 85C SH 60 TO LASALLE 01/10/08 1.00 1000.00 939.16 1500.00 STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 3.00 800.00 1178.00 930.00 IM0701-189 PALISADE EAST 01/17/08 1.00 1000.00 2712.01 2500.00 NH 160A-002 DOUBLE TREE BRIDGE ( O-05-AJ) 01/17/08 1.00 1500.00 900.00 300.00 STA 093A-007 ON SH 93 IN BOULDER COUNTY 01/24/08 2.00 750.00 839.57 1050.00 C0253-199 I25 RUBBILIZATION N OF SH 56 01/24/08 1.00 1000.00 1460.00 1080.00 SHE 050A-007 SH 50 BETWEEN MORRIS/FORTINO 01/31/08 3.00 900.00 1213.75 500.00 STA2873-148 FEDRERAL BLVD (SH 287) AT 70T 02/07/08 2.00 500.00 263.29 55.00 HB 0131-050 SH 13 NORTH OF RIFLE 02/07/08 1.00 1500.00 970.00 300.00 IM 0252-386 I-25: RESURFACE 23RD TO 48TH 02/14/08 4.00 500.00 700.95 830.00 STA 017A-010 BEGINNING OF SH 17 FROM MP 69 02/14/08 1.00 1500.00 1770.00 300.00 STA 391A-003 KIPLING: 6TH AVE TO COLFAX 02/14/08 2.00 1000.00 442.86 210.02 STA0252-397 I25 NORTHGATE NORTH 02/14/08 3.00 1100.00 702.27 1046.80 C 0253-202 I-25 02/15/08 1.00 1500.00 2000.00 2000.00 NH0405-032 COLFAX AVENUE FROM COLORADO 02/28/08 10.00 400.00 496.04 545.00 NH 0404-046 COLFAX AVE: ARAPAHOE/ADAMS CO 02/28/08 4.00 1000.00 322.92 540.00 STA 002A-001 COLO. BLVD(SH 2A): MEXICO TO 02/28/08 4.00 1200.00 718.74 324.80 IM0252-393 DENVER - I-25 FROM SANTA FE D 02/28/08 12.00 1000.00 760.33 682.50 C 0702-274 FRISCO (MM 201) TO EAST VAIL 03/06/08 2.00 1675.00 1093.55 1255.00 STU 0251-329 S OF COLORADO CITY TO CEDARWO 03/06/08 8.00 800.00 561.01 1030.04 HB0132-017 SH13 WY STATE LINE SOUTH OVER 03/13/08 1.00 1500.00 1908.33 1100.00 SHE0702-276 EAGLE COUNTY I-70 MP 171 TO M 03/13/08 2.00 2000.00 700.00 1000.00 STA 072A-030 SH 72, 64TH AVE TO 84TH PKWY 03/13/08 4.00 400.00 534.82 165.00 IM0703-327 I-70 SILVERTHORNE TO EJMT 03/20/08 1.00 1500.00 1055.63 1375.00 NH 1603-025 US 160 ALAMOSA MILL AND FILL 03/27/08 1.00 1500.00 1500.00 500.00 BR 0403-051 US 40 MP 245.85 03/27/08 1.00 980.00 875.00 875.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 77.00 915.97 715.18 723.65 NH 2871-031 US 287 SOUTH OF LAMAR FROM MP 04/03/08 8.00 1500.00 748.80 333.78 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 90 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00045 Conc Washout Str Each =================================================== C 1191-023 FROM MP 0.0 TO MP 2.6 GILPIN 04/03/08 1.00 1400.00 1314.29 650.00 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 8.00 663.00 1617.19 500.00 NH5501-013 US 550 N OF NM STATE LINE, MP 04/10/08 3.00 1200.00 1234.70 500.00 SHE 0501-056 US 50 AND 28.5 RD IN GRAND JU 04/10/08 1.00 1000.00 1000.00 750.00 NH 030A-026 SH30 1ST AVE AT HAVANA ST TO 04/17/08 13.00 600.00 339.51 500.00 IM 0704-207 I-70 FROM I-225 TO TOWER RD 04/17/08 3.00 500.00 1088.50 505.00 IM 0705-077 I70 WEST OF BURLINGTON EAST I 04/17/08 7.00 705.00 2176.15 4930.73 IM 0702-281 I-70 IN DOWD CANYON 04/30/08 1.00 11000.00 4702.00 1308.00 STA 009A-001 SH 9 HOOSIER PASS NORTH - PHA 05/01/08 1.00 1300.00 1560.00 1500.00 SHE 2854-114 SH 285-BRADEY CT. 05/01/08 2.00 150.00 430.21 690.00 NH0504-056 US 50 PASSING LANES EAST OF 5 05/15/08 2.00 1900.00 715.00 500.00 STA0703-334 I-70 FROM BAKERVILLE TO EAST 05/15/08 1.00 1600.00 760.40 952.00 SHE 0761-195 I-76: BURLINGTON CANAL TO BRO 05/15/08 5.00 757.00 518.95 895.00 C0703-337 I-70 EMPIRE JCT. EAST OVERLAY 06/05/08 1.00 1100.00 1806.67 550.00 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 2.00 1200.00 2000.00 1500.00 IM 070A-003 I 70 BETWEEN DENVER AND VAIL 06/12/08 10.00 800.00 655.00 640.00 C119A-054 SH 119 FROM MP 6.5 TO MP 8.0 06/19/08 1.00 1500.00 750.00 950.00 C 1601-060 US 160 MONTEZUMA COUNTY 06/26/08 2.00 2000.00 1350.00 750.00 STA 069A-023 SH 69 WESTCLIFFE AREA - CUSTE 06/26/08 1.00 1000.00 806.14 300.00 STA086A-048 INTERSECTION OF SH 86 & COUNT 06/26/08 1.00 600.00 793.75 500.00 STA069A-024 SH 69 HUERFANO COUNTY 06/26/08 1.00 900.00 787.98 675.00 STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 11.00 1200.00 648.11 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 86.00 1070.05 981.61 916.17 CR 600-275 I-70 VIADUCT - COLO. TO BRIGH 07/10/08 4.00 2000.00 2090.00 1270.00 STA0831-106 PARKER RD. (SH 83) MP 65.5 TO 07/10/08 8.00 855.00 904.38 876.00 STPR600-311 SH 72 FROM I-70 TO 86TH AVE 07/10/08 2.00 859.00 343.48 150.00 SHE 070A-005 I-70 B FROM PATTERSON (F RD.) 07/17/08 1.00 716.65 526.82 672.10 STA 0404-044 WEST COLFAX AVE. (US 40) FROM 07/17/08 4.00 988.00 347.19 617.82 STA R400-147 ON SH 52 IN MORGAN COUNTY 07/24/08 2.00 1200.00 1187.50 800.00 NH 2854-109 US 285: DEER CREEK INTERCHANG 07/31/08 6.00 828.00 969.89 475.00 SHE R600-310 US285/FED, I-25/120TH, I-270/ 08/14/08 3.00 637.00 1171.55 629.75 STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 20.00 655.00 1005.68 700.00 BRS R200-154 I-25 MP 59.09, MP 65.6, MP 79 09/04/08 4.00 750.00 681.25 775.00 C0702-284 I-70 TRUCK PARKING AT DOTSERO 09/11/08 1.00 1000.00 606.00 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 55.00 865.56 926.12 726.74 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 6.00 1200.00 912.02 180.00 BRS120A-008 ON SH 120 AT MP 2.76 IN FREMO 10/09/08 2.00 1000.00 1117.43 876.85 NH1601-058 ON US 160, FROM M.P. 21.40 TO 10/09/08 4.00 1100.00 876.60 500.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 91 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00045 Conc Washout Str Each =================================================== BR 0361-088 US36 AND CHERRYVALE RD 10/16/08 2.00 1200.00 783.11 525.00 SHE 0821-082 SH 82/SMITH WAY - PITKIN 10/16/08 1.00 800.00 1018.75 1000.00 NH 1602-117 THIS PROJECT IS LOCATED ABOUT 12/04/08 1.00 1500.00 3193.21 700.00 C1601-057 ON U.S. 160, APPROXIMATELY M. 12/04/08 2.00 350.00 711.45 820.00 C0063-027 US 6 LOMA STR H-01-E, MP 13.1 12/11/08 3.00 1000.00 588.50 240.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 21.00 1047.62 903.83 473.51 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 239.00 971.38 881.31 771.66 =============== 208-00050 Storm Drain Inlet Protection Each =================================================== NH 0821-085 SH82 EAGLE COUNTY 01/03/08 10.00 200.00 325.00 400.00 STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 23.00 250.00 169.24 57.00 IM0701-189 PALISADE EAST 01/17/08 6.00 250.00 501.16 400.00 ITS0361-087 US 36 (FEDERAL BLVD TO BOULDE 01/31/08 10.00 250.00 520.40 420.00 STA2873-148 FEDRERAL BLVD (SH 287) AT 70T 02/07/08 2.00 250.00 230.39 250.00 STA 391A-003 KIPLING: 6TH AVE TO COLFAX 02/14/08 16.00 220.00 272.69 453.80 C 0253-202 I-25 02/15/08 5.00 250.00 500.00 500.00 NH0405-032 COLFAX AVENUE FROM COLORADO 02/28/08 40.00 250.00 158.65 141.75 NH 0404-046 COLFAX AVE: ARAPAHOE/ADAMS CO 02/28/08 10.00 250.00 205.15 156.00 IM0252-393 DENVER - I-25 FROM SANTA FE D 02/28/08 12.00 250.00 147.78 305.00 STA 072A-030 SH 72, 64TH AVE TO 84TH PKWY 03/13/08 8.00 250.00 92.93 76.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 142.00 243.10 208.64 237.14 SHE 0501-056 US 50 AND 28.5 RD IN GRAND JU 04/10/08 2.00 250.00 298.33 250.00 C 067A-026 SH67 AND CR81 04/10/08 12.00 250.00 190.97 175.00 NH 0503-064 US 50:15TH AND 16TH ST IN CAN 04/17/08 9.00 300.00 179.88 50.00 IM 0704-207 I-70 FROM I-225 TO TOWER RD 04/17/08 20.00 250.00 220.25 103.00 IM 0702-281 I-70 IN DOWD CANYON 04/30/08 2.00 385.00 937.50 450.00 SHE 0761-195 I-76: BURLINGTON CANAL TO BRO 05/15/08 39.00 209.00 224.03 160.00 C0703-330 I-70 TWIN TUNNELS WESTBOUND 06/12/08 4.00 500.00 170.65 290.00 STA 069A-023 SH 69 WESTCLIFFE AREA - CUSTE 06/26/08 14.00 250.00 161.20 160.00 C0702-275 I-70 VAIL PASS 06/26/08 1.00 310.00 276.25 195.00 STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 3.00 210.00 240.25 179.38 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 106.00 250.58 221.16 154.56 CR 600-275 I-70 VIADUCT - COLO. TO BRIGH 07/10/08 50.00 200.00 328.33 435.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 92 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00050 Storm Drain Inlet Protection Each =================================================== STA0831-106 PARKER RD. (SH 83) MP 65.5 TO 07/10/08 12.00 267.00 151.58 32.60 STPR600-311 SH 72 FROM I-70 TO 86TH AVE 07/10/08 20.00 237.00 152.40 120.00 STA 0404-044 WEST COLFAX AVE. (US 40) FROM 07/17/08 12.00 306.00 128.03 37.58 SHE R600-310 US285/FED, I-25/120TH, I-270/ 08/14/08 10.00 252.00 127.13 52.67 STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 50.00 133.00 220.39 165.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 154.00 199.91 205.13 219.28 PLH 150A-007 INTERSECTION OF US 160 & SH 1 10/09/08 40.00 200.00 275.00 225.00 IMR600-322 I-25: COUNTY LINE RD TO BELLE 10/09/08 50.00 151.00 130.88 103.50 NH 1602-117 THIS PROJECT IS LOCATED ABOUT 12/04/08 6.00 300.00 347.73 190.00 SHE 0451-009 SH45 (PUEBLO BLVD) AND RED CR 12/04/08 1.00 250.00 224.80 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 97.00 181.44 186.55 159.02 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 499.00 219.37 207.30 198.90 =============== 208-00051 Storm Drain Inlet Protection (Type 1) Lin Foot =============================================== NH0853-066 US 85C SH 60 TO LASALLE 01/10/08 352.00 15.00 6.06 10.00 STA 093A-007 ON SH 93 IN BOULDER COUNTY 01/24/08 190.00 14.00 5.45 5.20 C0253-199 I25 RUBBILIZATION N OF SH 56 01/24/08 219.00 15.00 26.68 24.20 NH 2851-004 US 285 RESURFACE FROM NEW MEX 02/07/08 100.00 20.00 14.40 15.60 HB135A-024 SH 135 CRESTED BUTTE SOUTH 02/14/08 14.00 25.00 43.75 100.00 STA052A-029 ON SH 52 IN WELD COUNTY 03/20/08 20.00 17.00 18.22 16.25 NH 1603-025 US 160 ALAMOSA MILL AND FILL 03/27/08 100.00 20.00 20.25 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 995.00 15.99 11.08 15.67 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 40.00 39.00 54.33 3.25 STA 0343-026 ON US 34 IN YUMA COUNTY 04/17/08 12.00 50.00 17.17 16.00 SHE 2854-114 SH 285-BRADEY CT. 05/01/08 20.00 25.00 4.74 5.00 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 417.00 10.00 8.50 5.50 C119A-054 SH 119 FROM MP 6.5 TO MP 8.0 06/19/08 60.00 20.00 5.40 3.25 SHE3921-008 SH 392 @ WCR 31(HES) 06/19/08 5.00 50.00 75.17 165.00 STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 20.00 22.00 71.75 3.64 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 574.00 15.19 20.61 6.63 CR 600-275 I-70 VIADUCT - COLO. TO BRIGH 07/10/08 180.00 50.00 21.67 23.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 93 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00051 Storm Drain Inlet Protection (Type 1) Lin Foot =============================================== STA R400-147 ON SH 52 IN MORGAN COUNTY 07/24/08 5.00 25.00 52.99 7.50 NH 2854-109 US 285: DEER CREEK INTERCHANG 07/31/08 94.00 33.00 14.67 4.50 BR R400-206 VARIOUS LOCATIONS IN REGION 4 09/11/08 8.00 25.00 26.93 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 287.00 43.30 19.90 16.36 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 197.00 25.00 16.19 4.50 STA0853-069 US 85 & COLLINS ST (EATON) 12/04/08 20.00 8.00 31.62 31.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 217.00 23.43 17.37 6.94 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,073.00 20.33 15.55 12.35 =============== 208-00055 Rigid Inlet Prot Device Each =================================================== NH 0503-064 US 50:15TH AND 16TH ST IN CAN 04/17/08 5.00 850.00 586.19 440.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 850.00 586.19 440.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 850.00 586.19 440.00 =============== 208-00060 Temporary Slope Drain Lin Foot =============================================== STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 200.00 20.00 28.33 43.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 200.00 20.00 28.33 43.00 STA0831-106 PARKER RD. (SH 83) MP 65.5 TO 07/10/08 1.00 200.00 278.90 214.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 200.00 278.90 214.20 NH 1602-117 THIS PROJECT IS LOCATED ABOUT 12/04/08 200.00 22.00 31.24 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 200.00 22.00 31.24 21.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 401.00 21.45 31.02 32.45 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 94 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00070 Stabilized Construction Entrance Each =================================================== STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 3.00 1500.00 2075.08 1000.00 STA 0831-099 SH 83 AT RUSSELLVILLE ROAD SO 01/17/08 2.00 2000.00 1355.36 1200.00 IM 0252-392 I-25, TOMAH ROAD TO DOUGLAS L 01/17/08 1.00 1700.00 1766.65 2310.00 C0253-199 I25 RUBBILIZATION N OF SH 56 01/24/08 1.00 1500.00 1333.33 1000.00 CCR600-303 CHATFIELD STATE PARK MAIN RD, 01/31/08 5.00 1200.00 1502.37 1185.00 SHE 050A-007 SH 50 BETWEEN MORRIS/FORTINO 01/31/08 3.00 2000.00 1449.25 800.00 NH0342-048 US 34 IN WELD COUNTY 02/07/08 1.00 2000.00 1277.50 1500.00 HB 0131-050 SH 13 NORTH OF RIFLE 02/07/08 2.00 1800.00 2333.33 2500.00 IM 0252-386 I-25: RESURFACE 23RD TO 48TH 02/14/08 1.00 1500.00 1778.99 1120.00 STA 391A-003 KIPLING: 6TH AVE TO COLFAX 02/14/08 2.00 1500.00 897.69 263.84 STA0252-397 I25 NORTHGATE NORTH 02/14/08 9.00 1600.00 1094.09 732.27 NH0405-032 COLFAX AVENUE FROM COLORADO 02/28/08 2.00 1500.00 1390.20 840.00 NH 0404-046 COLFAX AVE: ARAPAHOE/ADAMS CO 02/28/08 1.00 1500.00 1554.99 1040.00 IM0252-393 DENVER - I-25 FROM SANTA FE D 02/28/08 1.00 1500.00 1341.03 1200.00 STA 079A-011 SH40 / SH79, SH40 (309.26-31 02/28/08 2.00 1400.00 1064.70 1183.44 C 0702-274 FRISCO (MM 201) TO EAST VAIL 03/06/08 1.00 5500.00 7336.15 10000.00 STU 0251-329 S OF COLORADO CITY TO CEDARWO 03/06/08 6.00 1500.00 963.60 618.02 STA 072A-030 SH 72, 64TH AVE TO 84TH PKWY 03/13/08 1.00 1500.00 1381.86 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 44.00 1659.09 1447.13 1183.37 NH 2871-031 US 287 SOUTH OF LAMAR FROM MP 04/03/08 11.00 2000.00 1337.54 450.00 C 1191-023 FROM MP 0.0 TO MP 2.6 GILPIN 04/03/08 2.00 1600.00 1655.71 1600.00 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 10.00 1200.00 2042.08 1250.00 C 067A-026 SH67 AND CR81 04/10/08 7.00 1100.00 1679.61 1500.00 NH 0503-064 US 50:15TH AND 16TH ST IN CAN 04/17/08 3.00 1500.00 1769.38 1500.00 IM 0705-077 I70 WEST OF BURLINGTON EAST I 04/17/08 10.00 1500.00 3974.66 6992.43 STA 009A-001 SH 9 HOOSIER PASS NORTH - PHA 05/01/08 2.00 1700.00 1862.50 2000.00 STA009A-025 SH9 FROM FAIRPLAY TO HARTSEL 05/01/08 2.00 1600.00 1100.00 600.00 SHE 2854-114 SH 285-BRADEY CT. 05/01/08 1.00 1500.00 998.77 875.00 NH0504-056 US 50 PASSING LANES EAST OF 5 05/15/08 6.00 1500.00 1347.14 1000.00 STA0703-334 I-70 FROM BAKERVILLE TO EAST 05/15/08 1.00 1500.00 1590.40 952.00 SHE 0761-195 I-76: BURLINGTON CANAL TO BRO 05/15/08 6.00 1900.00 1445.93 1500.00 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 4.00 1500.00 2116.67 2500.00 IM 070A-003 I 70 BETWEEN DENVER AND VAIL 06/12/08 10.00 1500.00 900.50 1050.00 C119A-054 SH 119 FROM MP 6.5 TO MP 8.0 06/19/08 1.00 2000.00 1656.67 1650.00 SHE3921-008 SH 392 @ WCR 31(HES) 06/19/08 2.00 1000.00 1106.67 560.00 STA 069A-023 SH 69 WESTCLIFFE AREA - CUSTE 06/26/08 6.00 1000.00 1358.39 350.00 STA086A-048 INTERSECTION OF SH 86 & COUNT 06/26/08 1.00 1500.00 2253.75 2715.00 STA069A-024 SH 69 HUERFANO COUNTY 06/26/08 3.00 1500.00 1795.10 765.00 C0702-275 I-70 VAIL PASS 06/26/08 2.00 2200.00 1662.50 1050.00 STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 4.00 1500.00 1524.55 1400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 94.00 1508.51 1843.99 1762.57 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 95 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00070 Stabilized Construction Entrance Each =================================================== STA0831-106 PARKER RD. (SH 83) MP 65.5 TO 07/10/08 8.00 1800.00 1493.75 649.00 STA R400-147 ON SH 52 IN MORGAN COUNTY 07/24/08 4.00 1200.00 1450.60 1600.00 NH 2854-109 US 285: DEER CREEK INTERCHANG 07/31/08 8.00 1700.00 1541.55 1950.00 STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 15.00 1100.00 1498.57 1320.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 35.00 1408.57 1497.93 1342.63 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 14.00 2000.00 1580.18 1610.00 BRS120A-008 ON SH 120 AT MP 2.76 IN FREMO 10/09/08 4.00 1000.00 1498.00 834.96 BR 0361-088 US36 AND CHERRYVALE RD 10/16/08 1.00 1200.00 1482.25 750.00 NH 1602-117 THIS PROJECT IS LOCATED ABOUT 12/04/08 3.00 1000.00 3299.99 1300.00 C1601-057 ON U.S. 160, APPROXIMATELY M. 12/04/08 2.00 1500.00 1914.91 3400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 24.00 1633.33 1675.25 1555.41 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 197.00 1539.59 1660.75 1533.36 =============== 208-00100 Sediment Removal and Disposal LUMP SUM =============================================== NH0853-066 US 85C SH 60 TO LASALLE 01/10/08 1.00 5500.00 1892.86 3000.00 STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 1.00 10000.00 33251.86 50100.00 STA 0831-099 SH 83 AT RUSSELLVILLE ROAD SO 01/17/08 1.00 1500.00 5438.58 1600.00 C0253-199 I25 RUBBILIZATION N OF SH 56 01/24/08 1.00 5000.00 3620.00 2700.00 NH 2851-004 US 285 RESURFACE FROM NEW MEX 02/07/08 1.00 3000.00 2475.01 2600.05 C 5502-063 US 550 SILVERTON TO RED MTN P 02/07/08 1.00 4000.00 3856.25 5800.00 STA2873-148 FEDRERAL BLVD (SH 287) AT 70T 02/07/08 1.00 2000.00 991.90 1080.00 HB 0131-050 SH 13 NORTH OF RIFLE 02/07/08 1.00 4000.00 5012.50 3000.00 NH 1602-116 SOUTH FORK EAST 02/14/08 1.00 2500.00 1687.45 1049.79 NH0405-032 COLFAX AVENUE FROM COLORADO 02/28/08 1.00 4000.00 2538.94 3100.00 STA 002A-001 COLO. BLVD(SH 2A): MEXICO TO 02/28/08 1.00 10000.00 4105.76 10732.05 HB0132-017 SH13 WY STATE LINE SOUTH OVER 03/13/08 1.00 7500.00 10283.33 3800.00 IM0703-327 I-70 SILVERTHORNE TO EJMT 03/20/08 1.00 4000.00 2965.63 2675.00 NH 1603-025 US 160 ALAMOSA MILL AND FILL 03/27/08 1.00 2000.00 1524.85 1000.00 BR 0403-051 US 40 MP 245.85 03/27/08 1.00 1500.00 1350.00 1350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15.00 4433.33 5275.90 6239.13 NH 2871-031 US 287 SOUTH OF LAMAR FROM MP 04/03/08 1.00 10000.00 6850.81 5135.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 96 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00100 Sediment Removal and Disposal LUMP SUM =============================================== C 1191-023 FROM MP 0.0 TO MP 2.6 GILPIN 04/03/08 1.00 4000.00 8331.43 10000.00 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 1.00 7500.00 31259.39 2500.00 NH5501-013 US 550 N OF NM STATE LINE, MP 04/10/08 1.00 5000.00 13184.20 5000.00 NH 030A-026 SH30 1ST AVE AT HAVANA ST TO 04/17/08 1.00 10000.00 2815.32 3600.00 IM 0704-207 I-70 FROM I-225 TO TOWER RD 04/17/08 1.00 4000.00 1763.75 1073.00 STA 009A-001 SH 9 HOOSIER PASS NORTH - PHA 05/01/08 1.00 3500.00 4700.00 8000.00 STA009A-025 SH9 FROM FAIRPLAY TO HARTSEL 05/01/08 1.00 5500.00 4406.67 1720.00 NH0504-056 US 50 PASSING LANES EAST OF 5 05/15/08 1.00 7500.00 5081.43 2000.00 STA0703-334 I-70 FROM BAKERVILLE TO EAST 05/15/08 1.00 2500.00 4092.35 2961.75 SHE 0761-195 I-76: BURLINGTON CANAL TO BRO 05/15/08 1.00 2500.00 3419.00 3000.00 C 090A-002 ON S.H. 90 FROM M.P. 10.6 TO 05/22/08 1.00 4000.00 1298.90 1500.00 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 1.00 7000.00 15933.33 7000.00 IM 070A-003 I 70 BETWEEN DENVER AND VAIL 06/12/08 1.00 10000.00 7328.50 8900.00 C0703-330 I-70 TWIN TUNNELS WESTBOUND 06/12/08 1.00 10000.00 2222.33 2100.00 C119A-054 SH 119 FROM MP 6.5 TO MP 8.0 06/19/08 1.00 5000.00 2216.67 3000.00 SHE3921-008 SH 392 @ WCR 31(HES) 06/19/08 1.00 1500.00 1616.67 1100.00 STA069A-024 SH 69 HUERFANO COUNTY 06/26/08 1.00 5000.00 2405.49 2500.00 C0702-275 I-70 VAIL PASS 06/26/08 1.00 1400.00 1962.50 1600.00 STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 1.00 12000.00 13834.79 6000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20.00 5895.00 8146.48 3934.49 CR 600-275 I-70 VIADUCT - COLO. TO BRIGH 07/10/08 1.00 20000.00 7526.67 8280.00 STA R400-147 ON SH 52 IN MORGAN COUNTY 07/24/08 1.00 3750.00 2534.40 1000.00 NH 2854-109 US 285: DEER CREEK INTERCHANG 07/31/08 1.00 5000.00 12879.89 3250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 9583.33 6589.65 4176.67 BRS120A-008 ON SH 120 AT MP 2.76 IN FREMO 10/09/08 1.00 4000.00 5354.98 5438.22 PLH 150A-007 INTERSECTION OF US 160 & SH 1 10/09/08 1.00 2000.00 550.00 1000.00 BR 0361-088 US36 AND CHERRYVALE RD 10/16/08 1.00 4500.00 3436.18 1250.00 SHE 0821-082 SH 82/SMITH WAY - PITKIN 10/16/08 1.00 2000.00 4475.00 2000.00 NH 1602-117 THIS PROJECT IS LOCATED ABOUT 12/04/08 1.00 10000.00 13764.10 6700.00 C1601-057 ON U.S. 160, APPROXIMATELY M. 12/04/08 1.00 1000.00 8386.84 16100.00 C0063-027 US 6 LOMA STR H-01-E, MP 13.1 12/11/08 1.00 7500.00 1420.40 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 7.00 4428.57 5019.75 4684.03 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 45.00 5425.56 6534.93 4835.44 =============== 208-00101 Sediment Removal and Disposal Hour =================================================== C 0702-274 FRISCO (MM 201) TO EAST VAIL 03/06/08 30.00 231.50 153.45 175.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 97 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00101 Sediment Removal and Disposal Hour =================================================== STU 0251-329 S OF COLORADO CITY TO CEDARWO 03/06/08 100.00 300.00 93.33 56.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 130.00 284.19 102.50 83.96 STA0831-106 PARKER RD. (SH 83) MP 65.5 TO 07/10/08 140.00 226.00 159.29 60.30 STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 40.00 190.00 219.71 275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 180.00 218.00 171.37 108.01 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 310.00 245.76 150.95 97.93 =============== 208-00110 Sediment Removal and Disposal Cubic Yard ============================================= SHE 050A-007 SH 50 BETWEEN MORRIS/FORTINO 01/31/08 50.00 30.00 96.29 50.00 STA0252-397 I25 NORTHGATE NORTH 02/14/08 20.00 46.00 101.66 54.97 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 70.00 34.57 97.53 51.42 C 067A-026 SH67 AND CR81 04/10/08 25.00 80.00 67.04 100.00 STA 069A-023 SH 69 WESTCLIFFE AREA - CUSTE 06/26/08 25.00 60.00 113.52 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 50.00 70.00 90.28 70.00 NHC040-027 POWERS BLVD - FROM WOODMEN RO 08/21/08 825.00 20.00 28.40 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 825.00 20.00 28.40 25.00 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 100.00 50.00 22.45 6.54 NH1601-058 ON US 160, FROM M.P. 21.40 TO 10/09/08 10.00 70.00 110.00 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 110.00 51.82 26.26 15.04 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,055.00 26.65 33.08 27.85 =============== 208-00205 Erosion Control Supervisor Hour =================================================== NH 0821-085 SH82 EAGLE COUNTY 01/03/08 20.00 150.00 80.00 60.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 98 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00205 Erosion Control Supervisor Hour =================================================== NH0853-066 US 85C SH 60 TO LASALLE 01/10/08 50.00 85.00 90.53 100.00 STA 0831-099 SH 83 AT RUSSELLVILLE ROAD SO 01/17/08 64.00 92.00 64.21 40.00 IM 0252-392 I-25, TOMAH ROAD TO DOUGLAS L 01/17/08 100.00 121.00 73.58 97.00 ITS0361-087 US 36 (FEDERAL BLVD TO BOULDE 01/31/08 20.00 80.00 125.70 85.00 CCR600-303 CHATFIELD STATE PARK MAIN RD, 01/31/08 50.00 70.00 53.81 50.00 SHE 050A-007 SH 50 BETWEEN MORRIS/FORTINO 01/31/08 14.00 180.00 201.25 75.00 NH0342-048 US 34 IN WELD COUNTY 02/07/08 40.00 84.00 61.62 46.00 NH 2851-004 US 285 RESURFACE FROM NEW MEX 02/07/08 155.00 110.00 73.70 98.80 STA2873-148 FEDRERAL BLVD (SH 287) AT 70T 02/07/08 40.00 75.00 64.00 79.00 HB 0131-050 SH 13 NORTH OF RIFLE 02/07/08 120.00 70.00 60.83 70.00 IM 0252-386 I-25: RESURFACE 23RD TO 48TH 02/14/08 232.00 80.00 74.42 24.00 STA 391A-003 KIPLING: 6TH AVE TO COLFAX 02/14/08 144.00 80.00 75.23 68.60 SHE0741-016 THE INTERSECTION OF SH 74 AND 02/14/08 30.00 80.00 62.00 55.00 NH 1602-116 SOUTH FORK EAST 02/14/08 155.00 87.00 113.68 99.73 NH0405-032 COLFAX AVENUE FROM COLORADO 02/28/08 225.00 75.00 68.71 78.75 NH 0404-046 COLFAX AVE: ARAPAHOE/ADAMS CO 02/28/08 145.00 75.00 74.84 78.00 STA 002A-001 COLO. BLVD(SH 2A): MEXICO TO 02/28/08 200.00 75.00 68.95 92.03 IM0252-393 DENVER - I-25 FROM SANTA FE D 02/28/08 95.00 80.00 59.72 47.25 STA 079A-011 SH40 / SH79, SH40 (309.26-31 02/28/08 24.00 87.00 82.74 86.76 C 0702-274 FRISCO (MM 201) TO EAST VAIL 03/06/08 200.00 75.00 96.36 110.00 STU 0251-329 S OF COLORADO CITY TO CEDARWO 03/06/08 1,000.00 85.00 64.33 56.65 SHE0702-276 EAGLE COUNTY I-70 MP 171 TO M 03/13/08 100.00 100.00 103.33 200.00 STA 072A-030 SH 72, 64TH AVE TO 84TH PKWY 03/13/08 100.00 80.00 56.24 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,323.00 84.58 71.64 73.17 NH 2871-031 US 287 SOUTH OF LAMAR FROM MP 04/03/08 960.00 80.00 35.04 20.00 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 1,280.00 55.00 69.61 20.00 NH5501-013 US 550 N OF NM STATE LINE, MP 04/10/08 405.00 100.00 64.77 50.00 NH 030A-026 SH30 1ST AVE AT HAVANA ST TO 04/17/08 100.00 80.00 72.63 65.00 STA 0343-026 ON US 34 IN YUMA COUNTY 04/17/08 250.00 50.00 94.33 75.00 IM 0704-207 I-70 FROM I-225 TO TOWER RD 04/17/08 120.00 100.00 120.25 50.00 IM 0705-077 I70 WEST OF BURLINGTON EAST I 04/17/08 960.00 69.00 51.34 78.71 IM 0702-281 I-70 IN DOWD CANYON 04/30/08 40.00 110.00 85.50 72.00 STA009A-025 SH9 FROM FAIRPLAY TO HARTSEL 05/01/08 200.00 63.00 78.67 86.00 SHE 2854-114 SH 285-BRADEY CT. 05/01/08 40.00 70.00 60.16 60.00 EPSW00-541 DENVER AREA; SH 6, I-25, I-70 05/08/08 30.00 80.00 122.78 102.00 NH0504-056 US 50 PASSING LANES EAST OF 5 05/15/08 384.00 75.00 57.86 30.00 STA0703-334 I-70 FROM BAKERVILLE TO EAST 05/15/08 110.00 84.00 73.00 90.00 SHE 0761-195 I-76: BURLINGTON CANAL TO BRO 05/15/08 120.00 84.00 68.89 85.00 NH0063-024 US 6 EAGLE 05/22/08 20.00 100.00 73.96 70.00 C 090A-002 ON S.H. 90 FROM M.P. 10.6 TO 05/22/08 56.00 100.00 54.76 80.00 IM 070A-003 I 70 BETWEEN DENVER AND VAIL 06/12/08 100.00 180.00 86.50 90.00 C0703-330 I-70 TWIN TUNNELS WESTBOUND 06/12/08 60.00 100.00 79.31 100.00 STA069A-024 SH 69 HUERFANO COUNTY 06/26/08 30.00 90.00 64.58 50.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 99 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00205 Erosion Control Supervisor Hour =================================================== STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 1,200.00 45.00 53.55 51.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6,465.00 68.84 60.95 48.40 CR 600-275 I-70 VIADUCT - COLO. TO BRIGH 07/10/08 320.00 75.00 71.67 75.00 STPR600-311 SH 72 FROM I-70 TO 86TH AVE 07/10/08 45.00 93.00 78.25 60.00 STA 0404-044 WEST COLFAX AVE. (US 40) FROM 07/17/08 144.00 85.00 66.46 97.82 SHE R600-310 US285/FED, I-25/120TH, I-270/ 08/14/08 100.00 84.00 73.53 47.63 STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 200.00 63.00 68.25 68.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 809.00 75.93 69.87 73.11 BRS120A-008 ON SH 120 AT MP 2.76 IN FREMO 10/09/08 100.00 75.00 80.74 53.91 NH1601-058 ON US 160, FROM M.P. 21.40 TO 10/09/08 230.00 80.00 88.00 50.00 PLH 150A-007 INTERSECTION OF US 160 & SH 1 10/09/08 100.00 100.00 75.00 100.00 IMR600-322 I-25: COUNTY LINE RD TO BELLE 10/09/08 60.00 86.00 75.80 83.20 BR 0361-088 US36 AND CHERRYVALE RD 10/16/08 1,000.00 35.00 45.42 50.00 SHE 0821-082 SH 82/SMITH WAY - PITKIN 10/16/08 50.00 110.00 65.00 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,540.00 52.96 55.52 54.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12,137.00 71.61 63.42 57.56 =============== 208-00206 Erosion Control Supervisor Day ==================================================== STA133A-034 133/187 RESURFACING 01/03/08 40.00 150.00 140.00 200.00 HB131A-033 SH 131 ROUTT COUNTY 01/10/08 130.00 90.00 334.40 272.00 STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 570.00 170.00 100.00 30.00 IM0701-189 PALISADE EAST 01/17/08 100.00 120.00 193.78 100.00 NH0342-043 ON US 34 IN WELD COUNTY 01/24/08 18.00 135.00 286.24 300.00 C0253-199 I25 RUBBILIZATION N OF SH 56 01/24/08 27.00 150.00 366.67 270.00 C 5502-063 US 550 SILVERTON TO RED MTN P 02/07/08 50.00 192.00 267.81 295.00 HB135A-024 SH 135 CRESTED BUTTE SOUTH 02/14/08 60.00 200.00 161.25 200.00 STA 017A-010 BEGINNING OF SH 17 FROM MP 69 02/14/08 60.00 100.00 217.25 200.00 HB0132-017 SH13 WY STATE LINE SOUTH OVER 03/13/08 110.00 100.00 170.25 115.00 NH 1603-025 US 160 ALAMOSA MILL AND FILL 03/27/08 60.00 225.00 239.13 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,225.00 151.17 174.56 112.29 C 1191-023 FROM MP 0.0 TO MP 2.6 GILPIN 04/03/08 85.00 167.00 304.71 185.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 100 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00206 Erosion Control Supervisor Day ==================================================== SHE 0501-056 US 50 AND 28.5 RD IN GRAND JU 04/10/08 10.00 350.00 345.00 300.00 STA 009A-001 SH 9 HOOSIER PASS NORTH - PHA 05/01/08 60.00 246.00 237.50 120.00 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 300.00 150.00 380.00 350.00 C 1601-060 US 160 MONTEZUMA COUNTY 06/26/08 58.00 200.00 264.20 115.00 C0702-275 I-70 VAIL PASS 06/26/08 15.00 800.00 297.50 115.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 528.00 191.39 323.94 263.86 STA0831-106 PARKER RD. (SH 83) MP 65.5 TO 07/10/08 140.00 81.00 104.14 49.20 STA R400-147 ON SH 52 IN MORGAN COUNTY 07/24/08 40.00 125.00 186.05 85.00 NH 2854-109 US 285: DEER CREEK INTERCHANG 07/31/08 85.00 158.00 397.01 200.00 NHC040-027 POWERS BLVD - FROM WOODMEN RO 08/21/08 25.00 150.00 326.31 40.00 BR R400-206 VARIOUS LOCATIONS IN REGION 4 09/11/08 35.00 125.00 134.50 60.00 C0702-284 I-70 TRUCK PARKING AT DOTSERO 09/11/08 40.00 100.00 117.60 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 365.00 114.78 190.83 88.73 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 100.00 150.00 407.72 269.50 NH 1602-117 THIS PROJECT IS LOCATED ABOUT 12/04/08 150.00 175.00 278.21 100.00 C1601-057 ON U.S. 160, APPROXIMATELY M. 12/04/08 151.00 150.00 72.83 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 401.00 159.35 261.47 123.44 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,519.00 155.63 220.98 142.42 =============== 208-00300 Temporary Berms Lin Foot =============================================== CCR600-303 CHATFIELD STATE PARK MAIN RD, 01/31/08 5,600.00 3.00 2.18 1.10 STU 0251-329 S OF COLORADO CITY TO CEDARWO 03/06/08 1,000.00 2.00 4.09 4.44 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6,600.00 2.85 2.42 1.61 STA R400-147 ON SH 52 IN MORGAN COUNTY 07/24/08 1,500.00 5.00 3.01 2.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,500.00 5.00 3.01 2.25 NH 1602-117 THIS PROJECT IS LOCATED ABOUT 12/04/08 3,000.00 2.00 8.41 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,000.00 2.00 8.41 4.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,100.00 2.91 3.65 2.34 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 101 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 209-00000 Water M Gallon =============================================== NH 2871-031 US 287 SOUTH OF LAMAR FROM MP 04/03/08 250.00 30.00 20.39 20.54 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 250.00 30.00 20.39 20.54 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 250.00 30.00 20.39 20.54 =============== 209-00100 Water (Landscaping) M Gallon =============================================== NH 1602-117 THIS PROJECT IS LOCATED ABOUT 12/04/08 206.00 120.00 187.26 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 206.00 120.00 187.26 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 206.00 120.00 187.26 50.00 =============== 209-00600 Dust Palliative (Mg Cl) Gallon ================================================= HB131A-033 SH 131 ROUTT COUNTY 01/10/08 23,022.00 1.50 0.92 0.90 STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 3,400.00 2.00 1.61 0.80 HB0132-017 SH13 WY STATE LINE SOUTH OVER 03/13/08 26,736.00 1.10 1.10 1.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 53,158.00 1.33 1.05 0.94 C 090A-002 ON S.H. 90 FROM M.P. 10.6 TO 05/22/08 2,816.00 4.00 2.05 2.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,816.00 4.00 2.05 2.50 NH1601-058 ON US 160, FROM M.P. 21.40 TO 10/09/08 12,520.00 1.00 1.97 3.00 NH 1602-117 THIS PROJECT IS LOCATED ABOUT 12/04/08 3,600.00 1.50 2.81 1.10 C1601-057 ON U.S. 160, APPROXIMATELY M. 12/04/08 44,872.00 1.00 1.34 0.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 60,992.00 1.03 1.51 1.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 116,966.00 1.24 1.32 1.11 =============== 210-00001 Res Structure Each =================================================== C0703-337 I-70 EMPIRE JCT. EAST OVERLAY 06/05/08 1.00 3000.00 4156.67 4500.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 102 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00001 Res Structure Each =================================================== STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 2.00 2000.00 4691.79 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 2333.33 4615.34 3166.67 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 2333.33 4615.34 3166.67 =============== 210-00007 Res Wheel Stop Each =================================================== NH 0503-064 US 50:15TH AND 16TH ST IN CAN 04/17/08 12.00 80.00 83.33 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12.00 80.00 83.33 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 80.00 83.33 50.00 =============== 210-00010 Res Mailbox Str Each =================================================== HB131A-033 SH 131 ROUTT COUNTY 01/10/08 5.00 275.00 317.00 555.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 275.00 317.00 555.00 NH 0503-064 US 50:15TH AND 16TH ST IN CAN 04/17/08 2.00 220.00 386.56 400.00 STA 0343-026 ON US 34 IN YUMA COUNTY 04/17/08 1.00 250.00 270.00 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 230.00 347.70 350.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 258.13 325.13 478.13 =============== 210-00011 Res Mailbox Str (Ty 1) Each =================================================== STA 093A-007 ON SH 93 IN BOULDER COUNTY 01/24/08 2.00 270.00 125.18 130.00 STA 017A-010 BEGINNING OF SH 17 FROM MP 69 02/14/08 6.00 275.00 286.06 200.00 STA 079A-011 SH40 / SH79, SH40 (309.26-31 02/28/08 25.00 196.00 154.96 135.56 HB0132-017 SH13 WY STATE LINE SOUTH OVER 03/13/08 1.00 250.00 413.33 170.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 34.00 215.88 175.63 147.62 NH 2871-031 US 287 SOUTH OF LAMAR FROM MP 04/03/08 5.00 250.00 231.94 231.08 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 103 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00011 Res Mailbox Str (Ty 1) Each =================================================== NH5501-013 US 550 N OF NM STATE LINE, MP 04/10/08 6.00 250.00 298.92 315.00 NH0504-056 US 50 PASSING LANES EAST OF 5 05/15/08 4.00 300.00 352.14 310.00 STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 5.00 325.00 161.56 153.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20.00 278.75 252.99 252.71 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 54.00 239.17 201.42 186.54 =============== 210-00012 Res Mailbox Str (Ty 2) Each =================================================== NH0342-043 ON US 34 IN WELD COUNTY 01/24/08 11.00 350.00 188.41 200.00 STA 093A-007 ON SH 93 IN BOULDER COUNTY 01/24/08 1.00 330.00 153.22 151.00 STA 079A-011 SH40 / SH79, SH40 (309.26-31 02/28/08 5.00 249.00 179.85 162.67 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 17.00 319.12 182.26 186.14 NH5501-013 US 550 N OF NM STATE LINE, MP 04/10/08 3.00 280.00 376.85 420.00 NH0504-056 US 50 PASSING LANES EAST OF 5 05/15/08 1.00 375.00 541.43 330.00 STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 1.00 350.00 195.01 187.58 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 313.00 362.60 355.52 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 22.00 317.73 231.71 224.63 =============== 210-00013 Res Mailbox Str (Ty 3) Each =================================================== STA 093A-007 ON SH 93 IN BOULDER COUNTY 01/24/08 3.00 380.00 222.63 195.00 STA 079A-011 SH40 / SH79, SH40 (309.26-31 02/28/08 5.00 346.00 232.64 216.89 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 358.75 229.53 208.68 NH 2871-031 US 287 SOUTH OF LAMAR FROM MP 04/03/08 3.00 400.00 374.43 371.20 NH5501-013 US 550 N OF NM STATE LINE, MP 04/10/08 1.00 375.00 422.86 420.00 NH0504-056 US 50 PASSING LANES EAST OF 5 05/15/08 2.00 425.00 575.71 375.00 STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 1.00 400.00 416.18 396.68 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7.00 403.57 466.12 382.90 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15.00 379.67 323.18 289.98 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 104 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00014 Res Mailbox Str (Ty 4) Each =================================================== STA 0831-099 SH 83 AT RUSSELLVILLE ROAD SO 01/17/08 5.00 661.00 277.63 265.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 661.00 277.63 265.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 661.00 277.63 265.00 =============== 210-00015 Res End Section Each =================================================== HB135A-024 SH 135 CRESTED BUTTE SOUTH 02/14/08 2.00 800.00 196.26 190.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 800.00 196.26 190.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 800.00 196.26 190.00 =============== 210-00035 Res Water Meter Each =================================================== STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 4.00 729.00 1274.75 820.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 729.00 1274.75 820.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 729.00 1274.75 820.00 =============== 210-00050 Res Fire Hydrant Each =================================================== STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 1.00 3000.00 2835.18 2200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 3000.00 2835.18 2200.00 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 1.00 2500.00 3133.33 2800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 2500.00 3133.33 2800.00 STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 1.00 1800.00 2170.18 2200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1800.00 2170.18 2200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 2433.33 2566.57 2400.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 105 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00065 Res Monument (Ty 3A) Each =================================================== STA 002A-001 COLO. BLVD(SH 2A): MEXICO TO 02/28/08 3.00 800.00 453.88 635.81 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 800.00 453.88 635.81 STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 1.00 500.00 444.68 260.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 500.00 444.68 260.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 725.00 451.58 541.86 =============== 210-00090 Res Delineator Each =================================================== C 0702-274 FRISCO (MM 201) TO EAST VAIL 03/06/08 397.00 56.50 80.73 130.00 IM0703-327 I-70 SILVERTHORNE TO EJMT 03/20/08 1.00 57.00 16.89 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 398.00 56.50 80.30 129.73 SHE 0761-195 I-76: BURLINGTON CANAL TO BRO 05/15/08 150.00 32.00 16.55 15.00 IM 070A-003 I 70 BETWEEN DENVER AND VAIL 06/12/08 72.00 35.00 57.50 28.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 222.00 32.97 22.20 19.22 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 620.00 48.08 53.26 90.16 =============== 210-00410 Modify Bridge Expan Device Each =================================================== IM0703-327 I-70 SILVERTHORNE TO EJMT 03/20/08 2.00 12100.00 5879.02 5665.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 12100.00 5879.02 5665.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 12100.00 5879.02 5665.00 =============== 210-00425 Res Bridge Railing Lin Foot =============================================== NH 160A-002 DOUBLE TREE BRIDGE ( O-05-AJ) 01/17/08 5.00 150.00 262.50 135.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5.00 150.00 262.50 135.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 106 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00425 Res Bridge Railing Lin Foot =============================================== BR R400-206 VARIOUS LOCATIONS IN REGION 4 09/11/08 320.00 60.00 25.05 15.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 320.00 60.00 25.05 15.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 325.00 61.38 26.28 16.85 =============== 210-00427 Res Pipe Handrailing Lin Foot =============================================== IM 0703-322 I-70 MM 213-215 04/03/08 8,405.00 15.75 24.00 28.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 8,405.00 15.75 24.00 28.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,405.00 15.75 24.00 28.00 =============== 210-00440 Repair Curb Lin Foot =============================================== IM0703-327 I-70 SILVERTHORNE TO EJMT 03/20/08 67.00 49.00 79.55 82.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 67.00 49.00 79.55 82.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 67.00 49.00 79.55 82.35 =============== 210-00473 Res TV Cameras Each =================================================== ITS0361-087 US 36 (FEDERAL BLVD TO BOULDE 01/31/08 1.00 1000.00 1154.76 550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1000.00 1154.76 550.00 IM 0703-322 I-70 MM 213-215 04/03/08 12.00 525.00 1990.00 2980.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12.00 525.00 1990.00 2980.00 STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 1.00 649.00 820.21 870.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 649.00 820.21 870.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 567.79 1675.46 2655.71 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 107 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00475 Res CCTV Pole Each =================================================== STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 1.00 1500.00 2099.07 1530.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1500.00 2099.07 1530.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1500.00 2099.07 1530.00 =============== 210-00510 Reb Port Present Str LUMP SUM =============================================== STA0252-397 I25 NORTHGATE NORTH 02/14/08 1.00 50000.00 47944.95 43834.84 STU 0251-329 S OF COLORADO CITY TO CEDARWO 03/06/08 1.00 5000.00 3918.02 3090.11 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 27500.00 20428.12 23462.48 BRS R200-154 I-25 MP 59.09, MP 65.6, MP 79 09/04/08 1.00 3750.00 6018.75 2225.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 3750.00 6018.75 2225.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 15625.00 13223.43 12843.74 =============== 210-00520 Reb Port Present Str Sq Yard ================================================ SHE0702-276 EAGLE COUNTY I-70 MP 171 TO M 03/13/08 2.30 1000.00 4310.67 1932.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.30 1000.00 4310.67 1932.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.30 1000.00 4310.67 1932.00 =============== 210-00750 Res Light Standard Each =================================================== STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 6.00 1600.00 1677.40 1600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 6.00 1600.00 1677.40 1600.00 C 1191-023 FROM MP 0.0 TO MP 2.6 GILPIN 04/03/08 14.00 727.00 2925.56 2250.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 108 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00750 Res Light Standard Each =================================================== NH 0503-064 US 50:15TH AND 16TH ST IN CAN 04/17/08 2.00 350.00 1908.26 2000.00 IM 0705-077 I70 WEST OF BURLINGTON EAST I 04/17/08 40.00 673.00 2612.97 2739.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 56.00 674.96 2699.83 2590.96 STA0831-106 PARKER RD. (SH 83) MP 65.5 TO 07/10/08 1.00 2000.00 1063.21 884.70 STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 2.00 1600.00 1636.93 1530.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 1733.33 1428.30 1314.90 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 5.00 1000.00 1767.01 1200.00 SHE 0821-082 SH 82/SMITH WAY - PITKIN 10/16/08 2.00 1000.00 2150.00 1000.00 SHE 0451-009 SH45 (PUEBLO BLVD) AND RED CR 12/04/08 1.00 2000.00 518.20 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8.00 1125.00 1720.24 1012.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 73.00 843.81 2414.84 2284.09 =============== 210-00760 Res Luminaire Each =================================================== IM 0703-322 I-70 MM 213-215 04/03/08 128.00 368.00 1655.00 2610.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 128.00 368.00 1655.00 2610.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 128.00 368.00 1655.00 2610.00 =============== 210-00805 Res Overhead Sign Str Each =================================================== C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 1.00 16000.00 13376.51 11500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 16000.00 13376.51 11500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 16000.00 13376.51 11500.00 =============== 210-00810 Res Ground Sign Each =================================================== HB131A-033 SH 131 ROUTT COUNTY 01/10/08 11.00 300.00 327.40 550.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 109 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00810 Res Ground Sign Each =================================================== NH0853-066 US 85C SH 60 TO LASALLE 01/10/08 4.00 230.00 166.09 150.00 IM0701-189 PALISADE EAST 01/17/08 14.00 350.00 231.70 200.00 STA 0831-099 SH 83 AT RUSSELLVILLE ROAD SO 01/17/08 10.00 187.00 258.95 158.00 CCR600-303 CHATFIELD STATE PARK MAIN RD, 01/31/08 6.00 250.00 134.67 115.00 CM240-112 COLORADO SPRINGS - VARIOUS LO 02/07/08 6.00 168.00 195.87 287.60 STA 017A-010 BEGINNING OF SH 17 FROM MP 69 02/14/08 26.00 200.00 226.90 225.00 C 0253-202 I-25 02/15/08 1.00 200.00 250.00 250.00 STA 079A-011 SH40 / SH79, SH40 (309.26-31 02/28/08 3.00 256.00 303.36 379.56 C 0702-274 FRISCO (MM 201) TO EAST VAIL 03/06/08 116.00 140.00 203.41 240.00 STU 0251-329 S OF COLORADO CITY TO CEDARWO 03/06/08 2.00 250.00 238.20 206.01 HB0132-017 SH13 WY STATE LINE SOUTH OVER 03/13/08 28.00 120.00 232.50 170.00 SRP083A-032 HIGHWAY 83 AND HODGEN IN EL P 03/20/08 2.00 250.00 293.25 72.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 229.00 175.83 225.77 235.11 C 1191-023 FROM MP 0.0 TO MP 2.6 GILPIN 04/03/08 1.00 295.00 595.00 500.00 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 11.00 212.00 356.94 225.00 NH5501-013 US 550 N OF NM STATE LINE, MP 04/10/08 11.00 240.00 239.61 230.00 SHE 0501-056 US 50 AND 28.5 RD IN GRAND JU 04/10/08 2.00 250.00 475.00 500.00 C 067A-026 SH67 AND CR81 04/10/08 10.00 225.00 505.65 350.00 STA 0343-026 ON US 34 IN YUMA COUNTY 04/17/08 20.00 90.00 218.33 200.00 IM 0705-077 I70 WEST OF BURLINGTON EAST I 04/17/08 114.00 90.00 105.92 109.59 STA0703-334 I-70 FROM BAKERVILLE TO EAST 05/15/08 5.00 198.00 288.23 291.15 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 118.00 240.00 127.00 150.00 C119A-054 SH 119 FROM MP 6.5 TO MP 8.0 06/19/08 8.00 300.00 330.83 325.00 SHE3921-008 SH 392 @ WCR 31(HES) 06/19/08 4.00 180.00 214.17 195.00 STA 069A-023 SH 69 WESTCLIFFE AREA - CUSTE 06/26/08 17.00 250.00 235.30 450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 321.00 176.81 179.42 176.59 STA R400-147 ON SH 52 IN MORGAN COUNTY 07/24/08 2.00 200.00 359.96 600.00 SHE0831-102 PARKER RD: LONG AVE INTERSECT 07/24/08 2.00 250.00 371.00 500.00 STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 32.00 155.00 162.54 148.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 36.00 162.78 186.29 192.67 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 20.00 150.00 233.66 75.00 NH1601-058 ON US 160, FROM M.P. 21.40 TO 10/09/08 1.00 250.00 269.40 400.00 BR 0361-088 US36 AND CHERRYVALE RD 10/16/08 2.00 250.00 270.04 500.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 110 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00810 Res Ground Sign Each =================================================== SHE 0821-082 SH 82/SMITH WAY - PITKIN 10/16/08 7.00 250.00 168.33 83.33 SHE 0451-009 SH45 (PUEBLO BLVD) AND RED CR 12/04/08 4.00 400.00 265.80 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 34.00 208.82 231.92 114.22 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 620.00 177.39 200.77 195.72 =============== 210-00815 Res Sign Panel Each =================================================== NH0853-066 US 85C SH 60 TO LASALLE 01/10/08 16.00 60.00 68.36 80.00 STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 53.00 60.00 126.05 66.00 CM240-112 COLORADO SPRINGS - VARIOUS LO 02/07/08 248.00 30.00 35.83 12.48 STA2873-148 FEDRERAL BLVD (SH 287) AT 70T 02/07/08 3.00 125.00 441.17 400.00 STA 079A-011 SH40 / SH79, SH40 (309.26-31 02/28/08 4.00 107.00 71.61 81.34 SHE0702-276 EAGLE COUNTY I-70 MP 171 TO M 03/13/08 9.00 88.00 53.33 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 333.00 39.56 62.42 29.57 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 5.00 81.00 110.66 71.00 SHE 2854-114 SH 285-BRADEY CT. 05/01/08 2.00 100.00 203.90 145.00 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 23.00 80.00 40.33 35.00 STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 5.00 60.00 48.61 46.13 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 35.00 78.43 74.02 48.02 SHE0831-102 PARKER RD: LONG AVE INTERSECT 07/24/08 5.00 120.00 185.40 80.00 NH 2854-109 US 285: DEER CREEK INTERCHANG 07/31/08 3.00 134.00 65.38 47.00 STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 2.00 101.00 89.14 48.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 120.40 123.86 63.70 NH 1602-117 THIS PROJECT IS LOCATED ABOUT 12/04/08 3.00 300.00 132.42 53.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 300.00 132.42 53.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 381.00 47.31 67.06 32.35 =============== 210-00825 Res Flashing Beacon Each =================================================== STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 1.00 2000.00 1743.42 1600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 2000.00 1743.42 1600.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 111 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00825 Res Flashing Beacon Each =================================================== IM 0705-077 I70 WEST OF BURLINGTON EAST I 04/17/08 4.00 788.00 1571.78 1643.91 STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 2.00 1100.00 1079.43 1358.13 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 892.00 1338.56 1548.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 1050.29 1377.12 1555.99 =============== 210-00827 Res Pull Box Each =================================================== SRP083A-032 HIGHWAY 83 AND HODGEN IN EL P 03/20/08 4.00 200.00 472.50 375.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 200.00 472.50 375.00 STA0853-069 US 85 & COLLINS ST (EATON) 12/04/08 2.00 325.00 327.15 133.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 325.00 327.15 133.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 241.67 420.17 294.33 =============== 210-00830 Res Traf Sig Face Each =================================================== C119A-054 SH 119 FROM MP 6.5 TO MP 8.0 06/19/08 1.00 300.00 200.50 210.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 300.00 200.50 210.00 SHE0831-102 PARKER RD: LONG AVE INTERSECT 07/24/08 3.00 325.00 209.20 172.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 325.00 209.20 172.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 318.75 206.71 181.50 =============== 210-00831 Res Traf Sig Head Each =================================================== STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 8.00 321.00 315.61 288.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 321.00 315.61 288.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 321.00 315.61 288.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 112 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00848 Res Traf Sig Control+Cab Each =================================================== IM0252-393 DENVER - I-25 FROM SANTA FE D 02/28/08 2.00 3000.00 1826.77 1785.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 3000.00 1826.77 1785.00 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 2.00 3000.00 2650.00 2750.00 STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 1.00 3000.00 3998.30 3690.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 3000.00 3458.98 3063.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 3000.00 2891.25 2552.00 =============== 210-00860 Res Ped Push Button Each =================================================== SHE0831-102 PARKER RD: LONG AVE INTERSECT 07/24/08 2.00 150.00 79.40 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 150.00 79.40 90.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 150.00 79.40 90.00 =============== 210-00865 Res Ped Sig Head Each =================================================== SHE0831-102 PARKER RD: LONG AVE INTERSECT 07/24/08 2.00 200.00 156.20 205.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 200.00 156.20 205.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 200.00 156.20 205.00 =============== 210-00866 Res Fire Preempt Unit+Timer Each =================================================== STA2873-148 FEDRERAL BLVD (SH 287) AT 70T 02/07/08 1.00 1000.00 599.15 303.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1000.00 599.15 303.00 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 1.00 1500.00 650.86 575.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 113 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00866 Res Fire Preempt Unit+Timer Each =================================================== NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 12.00 275.00 668.33 675.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 13.00 369.23 664.84 667.31 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 414.29 658.27 641.29 =============== 210-00870 Res Coordination Unit Each =================================================== C 0702-274 FRISCO (MM 201) TO EAST VAIL 03/06/08 1.00 4000.00 21730.67 10750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 4000.00 21730.67 10750.00 STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 1.00 416.00 1179.75 1480.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 416.00 1179.75 1480.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 2208.00 7345.03 6115.00 =============== 210-00890 Res Int Detect Sys (Camera) Each =================================================== IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 1.00 1600.00 1460.80 1520.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 1600.00 1460.80 1520.00 SHE0831-102 PARKER RD: LONG AVE INTERSECT 07/24/08 1.00 1000.00 853.20 880.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 1000.00 853.20 880.00 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 1.00 1500.00 1130.31 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1500.00 1130.31 1000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 1366.67 1193.86 1133.33 =============== 210-00910 Res Traffic Counter (Perm) Each =================================================== NH5501-013 US 550 N OF NM STATE LINE, MP 04/10/08 1.00 1200.00 2219.75 3700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 1200.00 2219.75 3700.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1200.00 2219.75 3700.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 114 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-01000 Res Fence Lin Foot =============================================== BR 0403-051 US 40 MP 245.85 03/27/08 200.00 9.50 13.00 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 200.00 9.50 13.00 13.00 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 351.00 9.25 4.46 2.50 STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 70.00 15.00 15.28 9.99 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 421.00 10.21 6.26 3.75 BR 0361-088 US36 AND CHERRYVALE RD 10/16/08 281.00 10.00 8.64 1.00 SHE 0821-082 SH 82/SMITH WAY - PITKIN 10/16/08 610.00 15.00 4.75 2.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 891.00 13.42 6.49 2.03 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,512.00 12.01 6.54 3.96 =============== 210-01011 Res Gate Each =================================================== STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 1.00 500.00 833.37 920.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 500.00 833.37 920.00 NH0504-056 US 50 PASSING LANES EAST OF 5 05/15/08 2.00 515.00 426.57 400.00 STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 1.00 600.00 266.07 292.13 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 543.33 363.77 364.04 CR 600-275 I-70 VIADUCT - COLO. TO BRIGH 07/10/08 1.00 400.00 920.00 1260.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 400.00 920.00 1260.00 BR 0361-088 US36 AND CHERRYVALE RD 10/16/08 1.00 500.00 312.70 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 500.00 312.70 20.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 505.00 449.97 548.69 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 115 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-01050 Res C L Fence Lin Foot =============================================== CR 600-275 I-70 VIADUCT - COLO. TO BRIGH 07/10/08 80.00 15.00 24.00 28.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 80.00 15.00 24.00 28.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 80.00 15.00 24.00 28.00 =============== 210-01130 Res Gdrail Ty 3 Lin Foot =============================================== STA133A-034 133/187 RESURFACING 01/03/08 2,415.00 15.00 14.00 15.00 NH 160A-002 DOUBLE TREE BRIDGE ( O-05-AJ) 01/17/08 40.00 70.00 95.00 70.00 STA 093A-007 ON SH 93 IN BOULDER COUNTY 01/24/08 150.00 7.00 11.96 12.50 HB135A-024 SH 135 CRESTED BUTTE SOUTH 02/14/08 1,248.00 15.00 11.05 12.00 STA 017A-010 BEGINNING OF SH 17 FROM MP 69 02/14/08 117.00 15.00 50.49 52.50 IM0703-327 I-70 SILVERTHORNE TO EJMT 03/20/08 250.00 14.25 10.82 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,220.00 15.19 14.31 15.29 C 067A-026 SH67 AND CR81 04/10/08 390.00 10.00 22.59 22.00 C0703-337 I-70 EMPIRE JCT. EAST OVERLAY 06/05/08 29,470.00 11.00 10.97 11.00 C0703-330 I-70 TWIN TUNNELS WESTBOUND 06/12/08 60.00 30.00 20.89 15.00 C119A-054 SH 119 FROM MP 6.5 TO MP 8.0 06/19/08 46.00 75.00 14.35 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 29,966.00 11.12 11.24 11.15 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 1,459.00 15.00 6.44 7.65 NH1601-058 ON US 160, FROM M.P. 21.40 TO 10/09/08 37.50 20.00 29.00 45.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,496.50 15.13 6.71 8.59 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 35,682.50 11.77 11.04 11.53 =============== 210-01136 Res Gdrail Ty 3 (Dbl) Lin Foot =============================================== C0703-337 I-70 EMPIRE JCT. EAST OVERLAY 06/05/08 5,125.00 16.50 13.03 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,125.00 16.50 13.03 14.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,125.00 16.50 13.03 14.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 116 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-01140 Res Gdrail Ty 4 Lin Foot =============================================== C 0253-202 I-25 02/15/08 1,300.00 25.00 8.00 8.00 IM0703-327 I-70 SILVERTHORNE TO EJMT 03/20/08 50.00 27.00 115.75 133.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,350.00 25.07 33.35 12.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,350.00 25.07 33.35 12.65 =============== 210-01170 Res Gdrail Ty 7 Lin Foot =============================================== IM0703-324 GEORGETOWN HILL CHUTE 4 PHASE 12/11/08 1,500.00 15.00 18.08 9.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,500.00 15.00 18.08 9.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,500.00 15.00 18.08 9.75 =============== 210-01200 Res End Anchorage Each =================================================== STA133A-034 133/187 RESURFACING 01/03/08 18.00 600.00 202.67 200.00 HB135A-024 SH 135 CRESTED BUTTE SOUTH 02/14/08 35.00 250.00 178.40 130.00 STA 017A-010 BEGINNING OF SH 17 FROM MP 69 02/14/08 2.00 750.00 775.53 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 55.00 382.73 214.09 162.73 C0703-337 I-70 EMPIRE JCT. EAST OVERLAY 06/05/08 4.00 1100.00 865.67 850.00 C119A-054 SH 119 FROM MP 6.5 TO MP 8.0 06/19/08 1.00 400.00 809.17 800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5.00 960.00 846.83 840.00 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 4.00 400.00 564.33 785.00 NH1601-058 ON US 160, FROM M.P. 21.40 TO 10/09/08 2.00 400.00 860.80 1400.00 BR 0361-088 US36 AND CHERRYVALE RD 10/16/08 2.00 225.00 601.72 465.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8.00 356.25 615.62 858.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 68.00 422.06 347.52 294.41 =============== 210-01300 Res Impact Attenuator Each =================================================== CR 600-275 I-70 VIADUCT - COLO. TO BRIGH 07/10/08 6.00 1100.00 2350.00 2550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 1100.00 2350.00 2550.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 1100.00 2350.00 2550.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 117 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-01700 Res Sprinkler Head Each =================================================== STA 0343-026 ON US 34 IN YUMA COUNTY 04/17/08 4.00 80.00 170.00 105.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 80.00 170.00 105.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 80.00 170.00 105.00 =============== 210-01710 Res Valve Each =================================================== STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 1.00 630.00 1457.64 1900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 630.00 1457.64 1900.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 630.00 1457.64 1900.00 =============== 210-01720 Res Air Vent Each =================================================== STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 3.00 1300.00 1670.00 1300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 1300.00 1670.00 1300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 1300.00 1670.00 1300.00 =============== 210-02024 Relay Pipe (24 In) Lin Foot =============================================== STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 125.00 60.00 47.67 30.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 125.00 60.00 47.67 30.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 125.00 60.00 47.67 30.75 =============== 210-02048 Relay Pipe (48 In) Lin Foot =============================================== STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 170.00 80.00 67.10 38.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 170.00 80.00 67.10 38.95 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 170.00 80.00 67.10 38.95 =============== 210-02900 Relay Riprap Cubic Yard ============================================= STA 0831-099 SH 83 AT RUSSELLVILLE ROAD SO 01/17/08 50.00 48.75 53.66 24.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 50.00 48.75 53.66 24.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 118 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-02900 Relay Riprap Cubic Yard ============================================= STA0831-106 PARKER RD. (SH 83) MP 65.5 TO 07/10/08 7.00 45.00 68.54 51.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7.00 45.00 68.54 51.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 57.00 48.29 55.48 27.35 =============== 210-03100 Replace Conc Pvmt Sq Yard ================================================ IM 0704-207 I-70 FROM I-225 TO TOWER RD 04/17/08 1,840.00 275.00 331.88 228.00 C0703-337 I-70 EMPIRE JCT. EAST OVERLAY 06/05/08 165.00 159.00 123.67 120.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,005.00 265.45 318.75 219.11 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,005.00 265.45 318.75 219.11 =============== 210-04000 Adj Structure Each =================================================== STA 093A-007 ON SH 93 IN BOULDER COUNTY 01/24/08 9.00 500.00 585.88 650.00 SHE0702-276 EAGLE COUNTY I-70 MP 171 TO M 03/13/08 8.00 750.00 976.00 1328.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 17.00 617.65 705.92 969.06 SHE 0451-009 SH45 (PUEBLO BLVD) AND RED CR 12/04/08 4.00 500.00 791.00 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 500.00 791.00 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21.00 595.24 723.28 794.00 =============== 210-04010 Adj Manhole Each =================================================== NH 0821-085 SH82 EAGLE COUNTY 01/03/08 1.00 531.00 1575.00 650.00 STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 2.00 500.00 1366.48 970.00 CCR600-303 CHATFIELD STATE PARK MAIN RD, 01/31/08 2.00 450.00 379.70 485.00 STA 017A-010 BEGINNING OF SH 17 FROM MP 69 02/14/08 2.00 500.00 904.00 750.00 STA 391A-003 KIPLING: 6TH AVE TO COLFAX 02/14/08 68.00 400.00 466.43 425.04 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 119 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-04010 Adj Manhole Each =================================================== SHE0741-016 THE INTERSECTION OF SH 74 AND 02/14/08 1.00 790.00 795.00 1000.00 NH0405-032 COLFAX AVENUE FROM COLORADO 02/28/08 18.00 400.00 472.36 80.00 NH 0404-046 COLFAX AVE: ARAPAHOE/ADAMS CO 02/28/08 26.00 400.00 371.22 74.00 STA 002A-001 COLO. BLVD(SH 2A): MEXICO TO 02/28/08 82.00 425.00 441.45 503.44 STA 079A-011 SH40 / SH79, SH40 (309.26-31 02/28/08 5.00 505.00 613.82 379.56 STA 072A-030 SH 72, 64TH AVE TO 84TH PKWY 03/13/08 4.00 450.00 426.56 355.00 STA052A-029 ON SH 52 IN WELD COUNTY 03/20/08 16.00 440.00 554.82 828.90 NH 1603-025 US 160 ALAMOSA MILL AND FILL 03/27/08 34.00 1250.00 1244.46 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 261.00 527.72 509.67 498.81 NH 030A-026 SH30 1ST AVE AT HAVANA ST TO 04/17/08 64.00 400.00 442.39 592.70 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 8.00 500.00 653.33 850.00 C119A-054 SH 119 FROM MP 6.5 TO MP 8.0 06/19/08 9.00 550.00 472.50 450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 81.00 426.54 456.86 602.26 STA 0404-044 WEST COLFAX AVE. (US 40) FROM 07/17/08 10.00 535.00 482.21 489.11 STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 11.00 449.00 458.39 590.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 21.00 489.95 470.53 541.96 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 363.00 502.96 496.53 524.39 =============== 210-04011 Adj Manhole (Spec) Each =================================================== STA 0404-044 WEST COLFAX AVE. (US 40) FROM 07/17/08 8.00 1000.00 704.16 695.05 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 1000.00 704.16 695.05 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 1000.00 704.16 695.05 =============== 210-04015 Modify Manhole Each =================================================== IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 1.00 1400.00 2090.39 1500.00 NH 0503-064 US 50:15TH AND 16TH ST IN CAN 04/17/08 2.00 1500.00 2348.83 2000.00 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 6.00 2500.00 1258.33 975.00 C119A-054 SH 119 FROM MP 6.5 TO MP 8.0 06/19/08 1.00 3250.00 2587.50 1700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 10.00 2265.00 1822.60 1305.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 120 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-04015 Modify Manhole Each =================================================== STA 0404-044 WEST COLFAX AVE. (US 40) FROM 07/17/08 2.00 1700.00 1746.40 1544.56 STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 4.00 1300.00 1733.57 1840.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 1433.33 1738.24 1741.52 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 1953.13 1777.88 1468.70 =============== 210-04016 Modify Manhole (Spec) Each =================================================== STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 2.00 3000.00 5700.32 2600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 3000.00 5700.32 2600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 3000.00 5700.32 2600.00 =============== 210-04020 Modify Inlet Each =================================================== NH0853-066 US 85C SH 60 TO LASALLE 01/10/08 15.00 1750.00 2055.48 3500.00 IM0701-189 PALISADE EAST 01/17/08 2.00 1925.00 3960.00 1000.00 NH0405-032 COLFAX AVENUE FROM COLORADO 02/28/08 1.00 1750.00 2528.64 2398.00 STA 002A-001 COLO. BLVD(SH 2A): MEXICO TO 02/28/08 2.00 2700.00 2860.75 4330.64 IM0703-327 I-70 SILVERTHORNE TO EJMT 03/20/08 3.00 1900.00 3400.28 3739.60 STA052A-029 ON SH 52 IN WELD COUNTY 03/20/08 5.00 2000.00 1912.98 2058.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 28.00 1891.07 2408.35 3109.70 SHE 0501-056 US 50 AND 28.5 RD IN GRAND JU 04/10/08 1.00 1700.00 2310.00 1500.00 STA0703-334 I-70 FROM BAKERVILLE TO EAST 05/15/08 18.00 1800.00 3237.60 3438.00 C0703-337 I-70 EMPIRE JCT. EAST OVERLAY 06/05/08 6.00 1700.00 1956.67 1900.00 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 2.00 2500.00 1291.67 1600.00 C0703-330 I-70 TWIN TUNNELS WESTBOUND 06/12/08 4.00 2000.00 2422.33 2500.00 STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 1.00 2000.00 1365.84 1141.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 32.00 1853.13 2783.25 2785.18 NH 2854-109 US 285: DEER CREEK INTERCHANG 07/31/08 2.00 2100.00 1675.86 4500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 2100.00 1675.86 4500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 62.00 1878.23 2537.06 2987.06 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 121 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-04025 Modify Structure Each =================================================== STA0831-106 PARKER RD. (SH 83) MP 65.5 TO 07/10/08 1.00 4000.00 4560.00 4986.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 4000.00 4560.00 4986.00 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 1.00 1500.00 1448.86 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1500.00 1448.86 500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 2750.00 2758.82 2743.00 =============== 210-04030 Modify Guardrail Lin Foot =============================================== IM0701-189 PALISADE EAST 01/17/08 4,025.00 3.00 5.31 5.00 STA0252-397 I25 NORTHGATE NORTH 02/14/08 26,890.00 4.00 3.51 3.17 SHE0702-276 EAGLE COUNTY I-70 MP 171 TO M 03/13/08 500.00 21.00 21.00 23.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 31,415.00 4.14 4.12 3.72 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 31,415.00 4.14 4.12 3.72 =============== 210-04050 Adj Valve Box Each =================================================== NH 0821-085 SH82 EAGLE COUNTY 01/03/08 10.00 271.00 390.00 480.00 STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 3.00 900.00 572.98 540.00 STA 017A-010 BEGINNING OF SH 17 FROM MP 69 02/14/08 4.00 300.00 539.00 750.00 STA 391A-003 KIPLING: 6TH AVE TO COLFAX 02/14/08 28.00 250.00 231.35 304.47 NH0405-032 COLFAX AVENUE FROM COLORADO 02/28/08 94.00 250.00 212.46 31.70 NH 0404-046 COLFAX AVE: ARAPAHOE/ADAMS CO 02/28/08 26.00 250.00 171.40 45.00 STA 002A-001 COLO. BLVD(SH 2A): MEXICO TO 02/28/08 122.00 225.00 255.67 470.96 STA 079A-011 SH40 / SH79, SH40 (309.26-31 02/28/08 2.00 287.00 240.09 271.11 STA 072A-030 SH 72, 64TH AVE TO 84TH PKWY 03/13/08 26.00 300.00 156.89 85.00 STA052A-029 ON SH 52 IN WELD COUNTY 03/20/08 29.00 250.00 361.48 568.85 NH 1603-025 US 160 ALAMOSA MILL AND FILL 03/27/08 25.00 300.00 836.09 700.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 369.00 255.24 256.10 315.18 NH 030A-026 SH30 1ST AVE AT HAVANA ST TO 04/17/08 76.00 200.00 220.28 257.70 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 122 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-04050 Adj Valve Box Each =================================================== NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 5.00 500.00 481.67 650.00 C119A-054 SH 119 FROM MP 6.5 TO MP 8.0 06/19/08 18.00 300.00 280.00 275.00 STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 7.00 270.00 303.93 423.33 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 106.00 235.75 244.64 290.08 SHE 070A-005 I-70 B FROM PATTERSON (F RD.) 07/17/08 2.00 302.64 276.45 212.00 STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 16.00 261.00 249.93 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 18.00 265.63 252.10 201.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 493.00 251.43 253.71 305.63 =============== 210-04060 Adj Water Meter Each =================================================== STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 1.00 540.00 667.68 820.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 540.00 667.68 820.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 540.00 667.68 820.00 =============== 210-04070 Adjust Well Each =================================================== NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 6.00 750.00 2566.67 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 750.00 2566.67 1100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 750.00 2566.67 1100.00 =============== 210-04200 Adj Gdrail Lin Foot =============================================== NH 0821-085 SH82 EAGLE COUNTY 01/03/08 463.00 4.00 7.50 5.00 STA133A-034 133/187 RESURFACING 01/03/08 5,175.00 2.00 2.88 4.00 HB135A-024 SH 135 CRESTED BUTTE SOUTH 02/14/08 5,012.00 2.50 2.36 2.20 SHE0702-276 EAGLE COUNTY I-70 MP 171 TO M 03/13/08 41,378.00 1.80 2.37 2.10 STA 072A-030 SH 72, 64TH AVE TO 84TH PKWY 03/13/08 140.00 3.00 5.48 5.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 52,168.00 1.91 2.46 2.33 C0703-337 I-70 EMPIRE JCT. EAST OVERLAY 06/05/08 5,000.00 3.75 4.08 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,000.00 3.75 4.08 4.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 57,168.00 2.07 2.60 2.48 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 123 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 211-00100 Drilling Hole Lin Foot =============================================== NH 160A-002 DOUBLE TREE BRIDGE ( O-05-AJ) 01/17/08 152.00 30.00 27.50 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 152.00 30.00 27.50 25.00 CR 600-275 I-70 VIADUCT - COLO. TO BRIGH 07/10/08 1,922.00 75.00 87.33 62.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,922.00 75.00 87.33 62.00 NH 1602-117 THIS PROJECT IS LOCATED ABOUT 12/04/08 250.00 25.00 78.50 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 250.00 25.00 78.50 20.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,324.00 66.68 83.51 55.06 =============== 211-01111 Rock Reinf (Dowels) Lin Foot =============================================== C 1191-023 FROM MP 0.0 TO MP 2.6 GILPIN 04/03/08 200.00 108.00 81.81 70.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 200.00 108.00 81.81 70.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 200.00 108.00 81.81 70.00 =============== 211-01115 Rock Reinf (No.10) Lin Foot =============================================== NH0503-065 3 MILES WEST OF COTOPAXI 08/28/08 598.00 100.00 105.06 101.04 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 598.00 100.00 105.06 101.04 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 598.00 100.00 105.06 101.04 =============== 211-01123 Rock Reinf (Perm A) Lin Foot =============================================== NH 1602-117 THIS PROJECT IS LOCATED ABOUT 12/04/08 175.00 65.00 54.69 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 175.00 65.00 54.69 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 175.00 65.00 54.69 50.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 124 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 211-01124 Rock Reinf (Perm B) Lin Foot =============================================== NH 1602-117 THIS PROJECT IS LOCATED ABOUT 12/04/08 175.00 70.00 57.74 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 175.00 70.00 57.74 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 175.00 70.00 57.74 50.00 =============== 211-01190 Optical Survey Targets Each =================================================== NH 1602-117 THIS PROJECT IS LOCATED ABOUT 12/04/08 5.00 160.00 1618.85 1600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 160.00 1618.85 1600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 160.00 1618.85 1600.00 =============== 211-01300 Rock Anchor Each =================================================== IM0703-324 GEORGETOWN HILL CHUTE 4 PHASE 12/11/08 40.00 1100.00 948.35 406.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 40.00 1100.00 948.35 406.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 1100.00 948.35 406.00 =============== 211-03005 Dewatering LUMP SUM =============================================== C0702-275 I-70 VAIL PASS 06/26/08 1.00 80000.00 242250.00 134000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 80000.00 242250.00 134000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 80000.00 242250.00 134000.00 =============== 212-00006 Seeding (Native) Acre =================================================== HB131A-033 SH 131 ROUTT COUNTY 01/10/08 18.00 350.00 1155.40 830.00 NH0853-066 US 85C SH 60 TO LASALLE 01/10/08 1.40 1500.00 1703.86 3500.00 STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 41.60 456.00 560.79 450.00 NH 160A-002 DOUBLE TREE BRIDGE ( O-05-AJ) 01/17/08 0.10 6000.00 10150.00 6000.00 STA 0831-099 SH 83 AT RUSSELLVILLE ROAD SO 01/17/08 2.00 768.00 909.30 368.00 IM 0252-392 I-25, TOMAH ROAD TO DOUGLAS L 01/17/08 13.00 725.00 506.75 241.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 125 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00006 Seeding (Native) Acre =================================================== NH0342-043 ON US 34 IN WELD COUNTY 01/24/08 0.10 2000.00 3837.36 3000.00 STA 093A-007 ON SH 93 IN BOULDER COUNTY 01/24/08 0.50 2000.00 3184.55 3130.00 C0253-199 I25 RUBBILIZATION N OF SH 56 01/24/08 2.00 1000.00 826.67 750.00 CCR600-303 CHATFIELD STATE PARK MAIN RD, 01/31/08 5.90 1500.00 2458.89 3735.00 NH 2851-004 US 285 RESURFACE FROM NEW MEX 02/07/08 0.50 2000.00 2940.01 1560.03 C 5502-063 US 550 SILVERTON TO RED MTN P 02/07/08 1.00 1900.00 1274.38 375.00 HB 0131-050 SH 13 NORTH OF RIFLE 02/07/08 2.00 700.00 772.86 1000.00 STA 017A-010 BEGINNING OF SH 17 FROM MP 69 02/14/08 7.13 400.00 586.50 450.00 SHE0741-016 THE INTERSECTION OF SH 74 AND 02/14/08 0.10 4800.00 3900.00 3200.00 STA0252-397 I25 NORTHGATE NORTH 02/14/08 13.00 550.00 580.90 492.69 NH 1602-116 SOUTH FORK EAST 02/14/08 0.50 2500.00 2731.17 1574.68 IM0252-393 DENVER - I-25 FROM SANTA FE D 02/28/08 0.20 1000.00 2437.14 1575.00 STA 079A-011 SH40 / SH79, SH40 (309.26-31 02/28/08 1.30 983.00 765.89 433.78 C 0702-274 FRISCO (MM 201) TO EAST VAIL 03/06/08 3.50 1230.00 2746.57 4690.00 STU 0251-329 S OF COLORADO CITY TO CEDARWO 03/06/08 16.00 450.00 659.80 309.01 HB0132-017 SH13 WY STATE LINE SOUTH OVER 03/13/08 20.00 850.00 400.94 600.00 SHE0702-276 EAGLE COUNTY I-70 MP 171 TO M 03/13/08 1.80 1000.00 1796.00 3188.00 SRP083A-032 HIGHWAY 83 AND HODGEN IN EL P 03/20/08 0.10 2000.00 6986.25 5000.00 NH 1603-025 US 160 ALAMOSA MILL AND FILL 03/27/08 0.50 2000.00 2763.15 2400.00 BR 0403-051 US 40 MP 245.85 03/27/08 2.00 832.00 1500.00 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 154.23 659.14 827.17 823.38 NH 2871-031 US 287 SOUTH OF LAMAR FROM MP 04/03/08 167.00 350.00 284.07 282.43 C 1191-023 FROM MP 0.0 TO MP 2.6 GILPIN 04/03/08 4.00 844.00 839.29 500.00 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 23.00 497.00 636.40 300.00 NH5501-013 US 550 N OF NM STATE LINE, MP 04/10/08 17.00 650.00 667.68 950.00 SHE 0501-056 US 50 AND 28.5 RD IN GRAND JU 04/10/08 0.90 3000.00 3620.00 5000.00 C 067A-026 SH67 AND CR81 04/10/08 4.00 800.00 851.13 500.00 NH 0503-064 US 50:15TH AND 16TH ST IN CAN 04/17/08 0.10 5000.00 5324.49 5000.00 STA 0343-026 ON US 34 IN YUMA COUNTY 04/17/08 3.98 500.00 381.67 375.00 IM 0705-077 I70 WEST OF BURLINGTON EAST I 04/17/08 57.00 424.00 298.43 287.14 HB0403-052 US40 BERTHOUD PASS 04/24/08 3.00 1500.00 1916.00 1389.00 IM 0702-281 I-70 IN DOWD CANYON 04/30/08 2.00 1100.00 4505.00 2520.00 STA 009A-001 SH 9 HOOSIER PASS NORTH - PHA 05/01/08 4.50 1400.00 740.00 700.00 STA009A-025 SH9 FROM FAIRPLAY TO HARTSEL 05/01/08 6.70 942.00 546.00 530.00 SHE 2854-114 SH 285-BRADEY CT. 05/01/08 0.30 1200.00 1273.27 1400.00 EPSW00-541 DENVER AREA; SH 6, I-25, I-70 05/08/08 1.00 1300.00 1603.33 1080.00 NH0504-056 US 50 PASSING LANES EAST OF 5 05/15/08 9.00 500.00 407.86 415.00 STA0703-334 I-70 FROM BAKERVILLE TO EAST 05/15/08 4.70 1100.00 675.80 529.00 SHE 0761-195 I-76: BURLINGTON CANAL TO BRO 05/15/08 5.59 962.00 547.45 550.00 STS 1151-021 SH 115 AT CR F45 IN FREMONT C 05/15/08 0.50 2500.00 1976.63 850.00 C 090A-002 ON S.H. 90 FROM M.P. 10.6 TO 05/22/08 1.00 2400.00 2058.50 920.00 C0703-337 I-70 EMPIRE JCT. EAST OVERLAY 06/05/08 2.00 810.00 620.00 360.00 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 20.00 650.00 493.33 300.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 126 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00006 Seeding (Native) Acre =================================================== IM 070A-003 I 70 BETWEEN DENVER AND VAIL 06/12/08 11.00 1800.00 532.00 470.00 C0703-330 I-70 TWIN TUNNELS WESTBOUND 06/12/08 1.30 1500.00 1500.90 2100.00 C119A-054 SH 119 FROM MP 6.5 TO MP 8.0 06/19/08 0.25 3000.00 2781.67 2750.00 SHE3921-008 SH 392 @ WCR 31(HES) 06/19/08 0.70 1500.00 2575.00 2200.00 C 1601-060 US 160 MONTEZUMA COUNTY 06/26/08 1.30 850.00 1963.00 1600.00 STA 069A-023 SH 69 WESTCLIFFE AREA - CUSTE 06/26/08 4.00 800.00 448.71 350.00 STA086A-048 INTERSECTION OF SH 86 & COUNT 06/26/08 0.50 1500.00 1726.25 1630.00 STA069A-024 SH 69 HUERFANO COUNTY 06/26/08 2.95 600.00 512.10 350.00 SHE0091-033 SH9 SIGNAL INTERCONNECT 06/26/08 0.30 3100.00 2503.75 2070.00 C0702-275 I-70 VAIL PASS 06/26/08 2.03 1650.00 825.00 550.00 STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 50.56 375.00 550.09 358.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 412.16 545.34 514.59 405.61 STA0831-106 PARKER RD. (SH 83) MP 65.5 TO 07/10/08 0.30 3300.00 2450.88 2786.00 STA R400-147 ON SH 52 IN MORGAN COUNTY 07/24/08 5.80 550.00 442.30 360.00 SHE0831-102 PARKER RD: LONG AVE INTERSECT 07/24/08 0.80 1800.00 846.00 475.00 NH 2854-109 US 285: DEER CREEK INTERCHANG 07/31/08 9.00 645.00 438.98 350.00 SHE R600-310 US285/FED, I-25/120TH, I-270/ 08/14/08 0.15 5700.00 4292.11 4465.53 NHC040-027 POWERS BLVD - FROM WOODMEN RO 08/21/08 5.00 750.00 754.35 485.00 STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 4.50 904.00 589.96 480.00 BRS R200-154 I-25 MP 59.09, MP 65.6, MP 79 09/04/08 0.90 1000.00 3106.25 3125.00 C0702-284 I-70 TRUCK PARKING AT DOTSERO 09/11/08 1.00 1500.00 1571.53 1052.63 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 27.45 819.60 645.17 567.35 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 74.00 450.00 337.02 295.00 BRS120A-008 ON SH 120 AT MP 2.76 IN FREMO 10/09/08 2.00 600.00 859.06 869.95 NH1601-058 ON US 160, FROM M.P. 21.40 TO 10/09/08 24.00 1000.00 941.20 1000.00 PLH 150A-007 INTERSECTION OF US 160 & SH 1 10/09/08 1.00 1500.00 1450.00 1100.00 BR 0361-088 US36 AND CHERRYVALE RD 10/16/08 3.00 650.00 584.76 550.00 NH 1602-117 THIS PROJECT IS LOCATED ABOUT 12/04/08 9.00 1500.00 1855.04 1400.00 C1601-057 ON U.S. 160, APPROXIMATELY M. 12/04/08 21.70 900.00 1165.00 1100.00 C0063-027 US 6 LOMA STR H-01-E, MP 13.1 12/11/08 0.50 800.00 1531.04 490.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 135.20 705.47 561.89 643.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 729.04 609.44 591.18 544.24 =============== 212-00007 Seeding (Native) (Hydraulic) Acre =================================================== SHE 0821-082 SH 82/SMITH WAY - PITKIN 10/16/08 1.00 1200.00 1627.50 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1200.00 1627.50 1000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 1200.00 1627.50 1000.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 127 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00009 Seeding (Temporary) Acre =================================================== IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 0.80 434.00 515.49 160.00 IM 0705-077 I70 WEST OF BURLINGTON EAST I 04/17/08 5.50 196.00 230.92 109.59 STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 15.00 275.00 227.31 307.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 21.30 260.57 240.12 250.86 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21.30 260.57 240.12 250.86 =============== 212-00028 Seeding (Wetlands) Acre =================================================== STA 017A-010 BEGINNING OF SH 17 FROM MP 69 02/14/08 0.33 2000.00 1992.00 660.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 0.33 2000.00 1992.00 660.00 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 0.51 2000.00 2311.78 995.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 0.51 2000.00 2311.78 995.00 SHE 0821-082 SH 82/SMITH WAY - PITKIN 10/16/08 0.01 2500.00 67750.00 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 0.01 2500.00 67750.00 1000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 0.85 2005.88 2960.82 865.00 =============== 212-00032 Soil Conditioning Acre =================================================== HB131A-033 SH 131 ROUTT COUNTY 01/10/08 18.00 700.00 3552.40 2650.00 STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 40.50 3000.00 798.06 670.00 NH 160A-002 DOUBLE TREE BRIDGE ( O-05-AJ) 01/17/08 0.10 6000.00 5100.00 6000.00 STA 0831-099 SH 83 AT RUSSELLVILLE ROAD SO 01/17/08 2.00 4000.00 3438.56 2935.00 IM 0252-392 I-25, TOMAH ROAD TO DOUGLAS L 01/17/08 13.00 3100.00 2544.64 3134.25 NH0342-043 ON US 34 IN WELD COUNTY 01/24/08 0.10 3500.00 7625.00 5500.00 C 5502-063 US 550 SILVERTON TO RED MTN P 02/07/08 1.00 4000.00 1902.50 2850.00 HB 0131-050 SH 13 NORTH OF RIFLE 02/07/08 2.00 2000.00 4898.49 7200.00 STA 017A-010 BEGINNING OF SH 17 FROM MP 69 02/14/08 7.13 1500.00 1103.00 900.00 SHE0741-016 THE INTERSECTION OF SH 74 AND 02/14/08 0.10 6900.00 7690.00 3200.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 128 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00032 Soil Conditioning Acre =================================================== STA0252-397 I25 NORTHGATE NORTH 02/14/08 13.00 1800.00 3692.43 3777.28 STA 079A-011 SH40 / SH79, SH40 (309.26-31 02/28/08 1.30 3400.00 2652.58 3144.92 C 0702-274 FRISCO (MM 201) TO EAST VAIL 03/06/08 3.50 1865.00 2813.24 4890.00 HB0132-017 SH13 WY STATE LINE SOUTH OVER 03/13/08 20.00 3000.00 4091.39 5300.00 NH 1603-025 US 160 ALAMOSA MILL AND FILL 03/27/08 0.50 3000.00 2556.52 2200.00 BR 0403-051 US 40 MP 245.85 03/27/08 2.00 2800.00 1625.00 1625.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 124.23 2448.54 2602.96 2634.19 C 1191-023 FROM MP 0.0 TO MP 2.6 GILPIN 04/03/08 4.00 2600.00 1493.13 1325.00 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 23.00 2200.00 2942.62 2125.00 NH5501-013 US 550 N OF NM STATE LINE, MP 04/10/08 17.00 2500.00 1419.49 1000.00 SHE 0501-056 US 50 AND 28.5 RD IN GRAND JU 04/10/08 0.90 2000.00 5496.67 5000.00 C 067A-026 SH67 AND CR81 04/10/08 4.00 3000.00 2384.88 1000.00 IM 0705-077 I70 WEST OF BURLINGTON EAST I 04/17/08 57.00 2700.00 2665.84 2184.21 HB0403-052 US40 BERTHOUD PASS 04/24/08 3.00 2500.00 2193.00 1722.00 STA 009A-001 SH 9 HOOSIER PASS NORTH - PHA 05/01/08 4.50 3400.00 1262.50 1000.00 STA009A-025 SH9 FROM FAIRPLAY TO HARTSEL 05/01/08 6.70 2800.00 1489.00 1350.00 NH0504-056 US 50 PASSING LANES EAST OF 5 05/15/08 9.00 2700.00 772.86 595.00 STA0703-334 I-70 FROM BAKERVILLE TO EAST 05/15/08 4.70 2500.00 2198.40 2962.00 SHE 0761-195 I-76: BURLINGTON CANAL TO BRO 05/15/08 5.59 2500.00 2689.53 3500.00 C 090A-002 ON S.H. 90 FROM M.P. 10.6 TO 05/22/08 1.00 2500.00 2429.88 862.50 C0703-337 I-70 EMPIRE JCT. EAST OVERLAY 06/05/08 2.00 4000.00 1046.67 740.00 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 20.00 2500.00 871.67 725.00 IM 070A-003 I 70 BETWEEN DENVER AND VAIL 06/12/08 11.00 5000.00 1395.00 835.00 C0703-330 I-70 TWIN TUNNELS WESTBOUND 06/12/08 1.30 3000.00 1918.03 2900.00 C119A-054 SH 119 FROM MP 6.5 TO MP 8.0 06/19/08 0.25 3500.00 3150.00 3250.00 C 1601-060 US 160 MONTEZUMA COUNTY 06/26/08 1.00 3000.00 1694.80 1275.00 STA086A-048 INTERSECTION OF SH 86 & COUNT 06/26/08 0.50 5000.00 5152.50 4885.00 STA069A-024 SH 69 HUERFANO COUNTY 06/26/08 2.95 4000.00 1306.48 1150.00 C0702-275 I-70 VAIL PASS 06/26/08 2.03 5000.00 4687.50 900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 181.42 2813.97 2208.40 1660.65 STA0831-106 PARKER RD. (SH 83) MP 65.5 TO 07/10/08 0.30 5000.00 5645.25 3636.00 STA R400-147 ON SH 52 IN MORGAN COUNTY 07/24/08 5.80 2500.00 1647.30 1550.00 SHE0831-102 PARKER RD: LONG AVE INTERSECT 07/24/08 0.80 3500.00 2205.00 1900.00 NHC040-027 POWERS BLVD - FROM WOODMEN RO 08/21/08 5.00 2000.00 1552.87 435.00 STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 4.50 2500.00 3939.57 2885.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 16.40 2442.07 2292.25 1631.60 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 43.00 3000.00 1750.76 1500.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 129 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 212-00032 Soil Conditioning Acre =================================================== BRS120A-008 ON SH 120 AT MP 2.76 IN FREMO 10/09/08 2.00 1500.00 1190.80 1017.57 NH1601-058 ON US 160, FROM M.P. 21.40 TO 10/09/08 12.00 1000.00 1923.00 2800.00 PLH 150A-007 INTERSECTION OF US 160 & SH 1 10/09/08 1.00 4500.00 2675.00 3250.00 BR 0361-088 US36 AND CHERRYVALE RD 10/16/08 3.00 2500.00 1172.69 583.00 SHE 0821-082 SH 82/SMITH WAY - PITKIN 10/16/08 1.00 3500.00 4725.00 5000.00 NH 1602-117 THIS PROJECT IS LOCATED ABOUT 12/04/08 9.00 6000.00 1302.29 1300.00 C1601-057 ON U.S. 160, APPROXIMATELY M. 12/04/08 21.70 1300.00 975.07 620.00 C0063-027 US 6 LOMA STR H-01-E, MP 13.1 12/11/08 0.50 800.00 8432.98 2000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 93.20 2597.75 1641.49 1462.32 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 415.25 2641.43 2131.28 1906.24 =============== 212-00050 Sod Sq Foot ================================================ NH 0503-064 US 50:15TH AND 16TH ST IN CAN 04/17/08 2,327.00 0.80 2.77 2.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,327.00 0.80 2.77 2.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,327.00 0.80 2.77 2.50 =============== 213-00002 Mulching (Weed Free Hay) Acre =================================================== NH0853-066 US 85C SH 60 TO LASALLE 01/10/08 2.00 1500.00 646.03 600.00 STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 40.50 1300.00 488.33 450.00 STA 0831-099 SH 83 AT RUSSELLVILLE ROAD SO 01/17/08 2.00 773.00 1056.25 495.00 IM 0252-392 I-25, TOMAH ROAD TO DOUGLAS L 01/17/08 13.00 638.00 490.41 367.50 NH0342-043 ON US 34 IN WELD COUNTY 01/24/08 0.10 2000.00 3217.39 3000.00 C0253-199 I25 RUBBILIZATION N OF SH 56 01/24/08 2.00 2000.00 580.00 500.00 CCR600-303 CHATFIELD STATE PARK MAIN RD, 01/31/08 5.00 1200.00 588.23 495.00 C 5502-063 US 550 SILVERTON TO RED MTN P 02/07/08 1.00 1600.00 2003.75 1170.00 STA 017A-010 BEGINNING OF SH 17 FROM MP 69 02/14/08 7.46 400.00 836.85 1060.00 SHE0741-016 THE INTERSECTION OF SH 74 AND 02/14/08 0.10 2500.00 4486.00 4400.00 STA0252-397 I25 NORTHGATE NORTH 02/14/08 4.50 380.00 537.39 602.17 STA 079A-011 SH40 / SH79, SH40 (309.26-31 02/28/08 1.30 1100.00 780.34 542.22 C 0702-274 FRISCO (MM 201) TO EAST VAIL 03/06/08 3.50 1230.00 2830.33 5090.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 82.46 1066.81 659.45 724.17 C 1191-023 FROM MP 0.0 TO MP 2.6 GILPIN 04/03/08 6.00 522.00 682.86 500.00 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 42.00 318.00 563.97 450.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 130 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00002 Mulching (Weed Free Hay) Acre =================================================== C 067A-026 SH67 AND CR81 04/10/08 4.00 850.00 759.53 500.00 NH 0503-064 US 50:15TH AND 16TH ST IN CAN 04/17/08 0.10 5000.00 7624.49 10000.00 STA 0343-026 ON US 34 IN YUMA COUNTY 04/17/08 6.00 350.00 438.33 415.00 IM 0705-077 I70 WEST OF BURLINGTON EAST I 04/17/08 77.00 383.00 340.76 328.78 HB0403-052 US40 BERTHOUD PASS 04/24/08 3.00 700.00 1780.50 1222.00 STA 009A-001 SH 9 HOOSIER PASS NORTH - PHA 05/01/08 4.50 716.00 440.00 360.00 STA009A-025 SH9 FROM FAIRPLAY TO HARTSEL 05/01/08 3.00 807.00 650.67 615.00 SHE 2854-114 SH 285-BRADEY CT. 05/01/08 0.30 1200.00 1136.72 1300.00 EPSW00-541 DENVER AREA; SH 6, I-25, I-70 05/08/08 1.00 1100.00 2006.67 1200.00 STA0703-334 I-70 FROM BAKERVILLE TO EAST 05/15/08 2.40 730.00 586.00 425.00 C0703-337 I-70 EMPIRE JCT. EAST OVERLAY 06/05/08 2.00 485.00 436.67 400.00 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 20.51 700.00 585.00 475.00 IM 070A-003 I 70 BETWEEN DENVER AND VAIL 06/12/08 11.00 1800.00 746.50 575.00 C0703-330 I-70 TWIN TUNNELS WESTBOUND 06/12/08 0.80 1500.00 1713.57 2035.00 STA 069A-023 SH 69 WESTCLIFFE AREA - CUSTE 06/26/08 4.00 750.00 627.71 600.00 STA086A-048 INTERSECTION OF SH 86 & COUNT 06/26/08 0.50 1500.00 2292.75 2171.00 STA069A-024 SH 69 HUERFANO COUNTY 06/26/08 1.98 700.00 753.39 700.00 SHE0091-033 SH9 SIGNAL INTERCONNECT 06/26/08 0.30 2300.00 3218.00 2990.00 C0702-275 I-70 VAIL PASS 06/26/08 2.03 2000.00 911.25 675.00 STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 65.00 275.00 445.95 435.63 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 257.42 493.44 496.37 452.17 STA R400-147 ON SH 52 IN MORGAN COUNTY 07/24/08 5.80 550.00 425.10 310.00 SHE0831-102 PARKER RD: LONG AVE INTERSECT 07/24/08 0.50 1800.00 1051.00 425.00 NHC040-027 POWERS BLVD - FROM WOODMEN RO 08/21/08 1.09 1000.00 1778.95 350.00 STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 4.50 576.00 660.86 590.00 BRS R200-154 I-25 MP 59.09, MP 65.6, MP 79 09/04/08 0.90 1000.00 2727.50 2610.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12.79 678.03 680.96 578.26 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 125.00 600.00 469.57 405.00 PLH 150A-007 INTERSECTION OF US 160 & SH 1 10/09/08 1.00 2000.00 1400.00 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 126.00 611.11 470.92 410.52 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 478.67 628.12 509.58 491.43 =============== 213-00003 Mulching (Weed Free) Acre =================================================== IM0252-393 DENVER - I-25 FROM SANTA FE D 02/28/08 0.20 1000.00 2038.48 1575.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 131 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00003 Mulching (Weed Free) Acre =================================================== BR 0403-051 US 40 MP 245.85 03/27/08 2.00 686.00 1000.00 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.20 714.55 1296.71 1052.27 NH 2871-031 US 287 SOUTH OF LAMAR FROM MP 04/03/08 250.00 250.00 277.07 272.16 NH0504-056 US 50 PASSING LANES EAST OF 5 05/15/08 15.00 500.00 426.43 395.00 SHE 0761-195 I-76: BURLINGTON CANAL TO BRO 05/15/08 5.59 1300.00 480.89 425.00 STS 1151-021 SH 115 AT CR F45 IN FREMONT C 05/15/08 0.50 2500.00 2094.83 800.00 C119A-054 SH 119 FROM MP 6.5 TO MP 8.0 06/19/08 0.25 3000.00 2816.67 2850.00 SHE3921-008 SH 392 @ WCR 31(HES) 06/19/08 0.70 750.00 1550.00 2200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 272.04 293.31 317.46 290.37 STA0831-106 PARKER RD. (SH 83) MP 65.5 TO 07/10/08 0.10 3000.00 3754.38 6278.00 NH 2854-109 US 285: DEER CREEK INTERCHANG 07/31/08 14.00 503.00 554.03 450.00 SHE R600-310 US285/FED, I-25/120TH, I-270/ 08/14/08 0.15 3900.00 3963.93 4024.67 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 14.25 556.28 613.85 528.53 NH1601-058 ON US 160, FROM M.P. 21.40 TO 10/09/08 24.00 700.00 757.20 600.00 BR 0361-088 US36 AND CHERRYVALE RD 10/16/08 2.00 650.00 656.00 590.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 26.00 696.15 746.63 599.23 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 314.49 341.48 393.96 332.03 =============== 213-00004 Mulching (Weed Free Straw) Acre =================================================== HB131A-033 SH 131 ROUTT COUNTY 01/10/08 18.00 400.00 682.00 605.00 NH 160A-002 DOUBLE TREE BRIDGE ( O-05-AJ) 01/17/08 0.10 5000.00 4650.00 2500.00 NH 2851-004 US 285 RESURFACE FROM NEW MEX 02/07/08 0.50 2000.00 3418.01 1872.04 HB 0131-050 SH 13 NORTH OF RIFLE 02/07/08 2.00 500.00 744.80 900.00 NH 1602-116 SOUTH FORK EAST 02/14/08 0.50 1900.00 3422.41 1889.62 STU 0251-329 S OF COLORADO CITY TO CEDARWO 03/06/08 24.00 350.00 255.65 283.26 HB0132-017 SH13 WY STATE LINE SOUTH OVER 03/13/08 20.00 650.00 530.39 550.00 NH 1603-025 US 160 ALAMOSA MILL AND FILL 03/27/08 0.50 2000.00 2713.98 2200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 65.60 503.81 527.25 514.01 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 132 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00004 Mulching (Weed Free Straw) Acre =================================================== NH5501-013 US 550 N OF NM STATE LINE, MP 04/10/08 17.00 700.00 788.02 780.00 SHE 0501-056 US 50 AND 28.5 RD IN GRAND JU 04/10/08 0.90 1500.00 3033.33 3000.00 C 090A-002 ON S.H. 90 FROM M.P. 10.6 TO 05/22/08 1.00 2500.00 1713.75 1380.00 C 1601-060 US 160 MONTEZUMA COUNTY 06/26/08 1.00 2000.00 1380.60 975.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 19.90 891.96 899.96 920.35 NH 1602-117 THIS PROJECT IS LOCATED ABOUT 12/04/08 9.00 2000.00 896.94 560.00 C1601-057 ON U.S. 160, APPROXIMATELY M. 12/04/08 21.70 1000.00 1134.30 1100.00 C0063-027 US 6 LOMA STR H-01-E, MP 13.1 12/11/08 0.50 500.00 2190.98 1750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 31.20 1280.45 1115.25 954.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 116.70 777.63 753.37 701.11 =============== 213-00005 Mulching (Decorative) Cubic Foot ============================================= STA0831-106 PARKER RD. (SH 83) MP 65.5 TO 07/10/08 1,758.00 2.70 5.86 6.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,758.00 2.70 5.86 6.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,758.00 2.70 5.86 6.50 =============== 213-00008 Mulching (Wood Chip) Cubic Foot ============================================= NH 0503-064 US 50:15TH AND 16TH ST IN CAN 04/17/08 80.00 3.50 3.96 2.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 80.00 3.50 3.96 2.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 80.00 3.50 3.96 2.50 =============== 213-00009 Flexible Growth Medium Acre =================================================== C 1191-023 FROM MP 0.0 TO MP 2.6 GILPIN 04/03/08 1.00 5000.00 3298.25 3200.00 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 2.00 1400.00 4331.42 3000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 2600.00 4042.13 3066.67 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 133 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00009 Flexible Growth Medium Acre =================================================== NH 2854-109 US 285: DEER CREEK INTERCHANG 07/31/08 1.00 3400.00 930.97 540.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 3400.00 930.97 540.00 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 4.00 4000.00 3397.47 4375.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 4000.00 3397.47 4375.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 3400.00 3415.04 3405.00 =============== 213-00011 Mulching (Hydraulic) Acre =================================================== C0253-199 I25 RUBBILIZATION N OF SH 56 01/24/08 2.00 1000.00 1710.00 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 1000.00 1710.00 1500.00 SHE 0821-082 SH 82/SMITH WAY - PITKIN 10/16/08 1.00 1000.00 1245.00 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 1000.00 1245.00 1000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 1000.00 1524.00 1333.33 =============== 213-00061 Mulch Tackifier Pound ================================================== HB131A-033 SH 131 ROUTT COUNTY 01/10/08 1,800.00 2.00 2.76 2.30 NH0853-066 US 85C SH 60 TO LASALLE 01/10/08 350.00 2.00 7.66 5.00 STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 8,100.00 2.50 1.96 1.80 NH 160A-002 DOUBLE TREE BRIDGE ( O-05-AJ) 01/17/08 10.00 20.00 41.00 12.00 STA 0831-099 SH 83 AT RUSSELLVILLE ROAD SO 01/17/08 400.00 3.00 2.91 2.05 IM 0252-392 I-25, TOMAH ROAD TO DOUGLAS L 01/17/08 2,600.00 2.40 1.89 1.47 NH0342-043 ON US 34 IN WELD COUNTY 01/24/08 10.00 25.00 8.76 10.00 C0253-199 I25 RUBBILIZATION N OF SH 56 01/24/08 400.00 2.00 3.15 2.15 CCR600-303 CHATFIELD STATE PARK MAIN RD, 01/31/08 1,000.00 2.00 1.79 1.65 NH 2851-004 US 285 RESURFACE FROM NEW MEX 02/07/08 100.00 5.00 5.18 1.98 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 134 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00061 Mulch Tackifier Pound ================================================== C 5502-063 US 550 SILVERTON TO RED MTN P 02/07/08 100.00 6.25 6.20 2.80 HB 0131-050 SH 13 NORTH OF RIFLE 02/07/08 450.00 2.50 4.75 4.00 STA 017A-010 BEGINNING OF SH 17 FROM MP 69 02/14/08 746.00 3.00 3.28 1.50 SHE0741-016 THE INTERSECTION OF SH 74 AND 02/14/08 20.00 14.25 8.35 2.50 STA0252-397 I25 NORTHGATE NORTH 02/14/08 900.00 1.80 3.10 3.29 NH 1602-116 SOUTH FORK EAST 02/14/08 100.00 7.00 6.78 2.10 IM0252-393 DENVER - I-25 FROM SANTA FE D 02/28/08 40.00 5.00 10.87 2.65 STA 079A-011 SH40 / SH79, SH40 (309.26-31 02/28/08 260.00 3.50 2.44 2.11 C 0702-274 FRISCO (MM 201) TO EAST VAIL 03/06/08 694.00 2.15 13.57 32.00 STU 0251-329 S OF COLORADO CITY TO CEDARWO 03/06/08 9,600.00 1.25 1.83 1.96 HB0132-017 SH13 WY STATE LINE SOUTH OVER 03/13/08 4,000.00 2.50 2.46 1.80 NH 1603-025 US 160 ALAMOSA MILL AND FILL 03/27/08 260.00 3.00 6.62 3.50 BR 0403-051 US 40 MP 245.85 03/27/08 400.00 2.55 2.00 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 32,340.00 2.13 2.47 2.63 NH 2871-031 US 287 SOUTH OF LAMAR FROM MP 04/03/08 50,000.00 1.60 1.51 1.49 C 1191-023 FROM MP 0.0 TO MP 2.6 GILPIN 04/03/08 1,200.00 2.05 2.80 2.10 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 8,400.00 1.55 1.86 1.90 NH5501-013 US 550 N OF NM STATE LINE, MP 04/10/08 3,400.00 3.00 2.68 3.10 SHE 0501-056 US 50 AND 28.5 RD IN GRAND JU 04/10/08 180.00 5.00 8.12 12.00 C 067A-026 SH67 AND CR81 04/10/08 800.00 2.75 2.94 2.00 NH 0503-064 US 50:15TH AND 16TH ST IN CAN 04/17/08 17.00 12.00 26.37 30.00 STA 0343-026 ON US 34 IN YUMA COUNTY 04/17/08 1,200.00 2.00 2.28 2.25 IM 0705-077 I70 WEST OF BURLINGTON EAST I 04/17/08 15,400.00 2.35 1.53 1.59 HB0403-052 US40 BERTHOUD PASS 04/24/08 1,500.00 2.00 3.66 3.00 STA 009A-001 SH 9 HOOSIER PASS NORTH - PHA 05/01/08 1,575.00 2.90 2.20 2.25 STA009A-025 SH9 FROM FAIRPLAY TO HARTSEL 05/01/08 600.00 3.00 2.20 2.14 SHE 2854-114 SH 285-BRADEY CT. 05/01/08 30.00 2.00 22.25 25.00 EPSW00-541 DENVER AREA; SH 6, I-25, I-70 05/08/08 1,500.00 2.35 4.67 3.60 NH0504-056 US 50 PASSING LANES EAST OF 5 05/15/08 3,000.00 1.70 1.91 1.79 STA0703-334 I-70 FROM BAKERVILLE TO EAST 05/15/08 480.00 3.00 2.13 2.15 SHE 0761-195 I-76: BURLINGTON CANAL TO BRO 05/15/08 1,690.00 2.65 2.24 2.20 STS 1151-021 SH 115 AT CR F45 IN FREMONT C 05/15/08 50.00 6.00 8.03 2.50 C 090A-002 ON S.H. 90 FROM M.P. 10.6 TO 05/22/08 200.00 3.00 5.02 2.30 C0703-337 I-70 EMPIRE JCT. EAST OVERLAY 06/05/08 400.00 2.70 3.37 3.00 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 4,102.00 2.50 2.53 2.25 IM 070A-003 I 70 BETWEEN DENVER AND VAIL 06/12/08 2,124.00 5.00 1.63 1.25 C0703-330 I-70 TWIN TUNNELS WESTBOUND 06/12/08 355.00 2.50 2.83 5.00 C119A-054 SH 119 FROM MP 6.5 TO MP 8.0 06/19/08 50.00 10.00 6.46 6.25 SHE3921-008 SH 392 @ WCR 31(HES) 06/19/08 140.00 2.50 5.47 5.50 C 1601-060 US 160 MONTEZUMA COUNTY 06/26/08 100.00 4.00 8.13 9.50 STA 069A-023 SH 69 WESTCLIFFE AREA - CUSTE 06/26/08 800.00 3.00 3.26 3.00 STA086A-048 INTERSECTION OF SH 86 & COUNT 06/26/08 100.00 3.00 9.43 8.70 STA069A-024 SH 69 HUERFANO COUNTY 06/26/08 370.00 3.50 3.54 3.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 135 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00061 Mulch Tackifier Pound ================================================== SHE0091-033 SH9 SIGNAL INTERCONNECT 06/26/08 60.00 7.75 6.55 9.20 C0702-275 I-70 VAIL PASS 06/26/08 305.00 6.00 3.00 1.50 STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 11,000.00 2.00 1.73 1.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 111,128.00 2.02 1.89 1.84 STA0831-106 PARKER RD. (SH 83) MP 65.5 TO 07/10/08 20.00 16.50 6.64 2.30 STA R400-147 ON SH 52 IN MORGAN COUNTY 07/24/08 1,160.00 2.20 1.90 2.05 SHE0831-102 PARKER RD: LONG AVE INTERSECT 07/24/08 100.00 5.00 4.09 2.15 NH 2854-109 US 285: DEER CREEK INTERCHANG 07/31/08 2,800.00 2.15 2.04 2.25 SHE R600-310 US285/FED, I-25/120TH, I-270/ 08/14/08 15.00 10.25 31.18 50.38 NHC040-027 POWERS BLVD - FROM WOODMEN RO 08/21/08 539.00 3.00 7.17 0.90 STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 675.00 2.20 2.12 2.15 BRS R200-154 I-25 MP 59.09, MP 65.6, MP 79 09/04/08 180.00 10.00 8.88 14.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5,489.00 2.63 2.68 2.59 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 25,000.00 2.00 1.93 1.69 NH1601-058 ON US 160, FROM M.P. 21.40 TO 10/09/08 4,800.00 4.00 3.41 2.50 PLH 150A-007 INTERSECTION OF US 160 & SH 1 10/09/08 200.00 4.00 4.75 3.50 BR 0361-088 US36 AND CHERRYVALE RD 10/16/08 400.00 2.15 3.41 3.75 SHE 0821-082 SH 82/SMITH WAY - PITKIN 10/16/08 200.00 6.00 3.75 5.00 NH 1602-117 THIS PROJECT IS LOCATED ABOUT 12/04/08 1,800.00 3.00 2.25 1.30 C1601-057 ON U.S. 160, APPROXIMATELY M. 12/04/08 4,341.00 2.50 2.51 1.30 C0063-027 US 6 LOMA STR H-01-E, MP 13.1 12/11/08 100.00 2.50 6.27 3.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 36,841.00 2.40 2.12 1.79 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 185,798.00 2.13 2.08 1.99 =============== 213-00100 Soil Binder Acre =================================================== STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 41.00 400.00 405.74 430.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 41.00 400.00 405.74 430.00 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 14.00 373.00 463.64 400.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 136 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00100 Soil Binder Acre =================================================== IM 0705-077 I70 WEST OF BURLINGTON EAST I 04/17/08 30.00 388.00 380.60 433.99 SHE 0761-195 I-76: BURLINGTON CANAL TO BRO 05/15/08 4.00 695.00 733.59 825.00 STA069A-024 SH 69 HUERFANO COUNTY 06/26/08 2.95 500.00 1488.85 1300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 50.95 414.47 473.66 505.49 STA0831-106 PARKER RD. (SH 83) MP 65.5 TO 07/10/08 2.00 892.00 673.58 529.60 STA R400-147 ON SH 52 IN MORGAN COUNTY 07/24/08 2.00 500.00 2505.20 825.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 696.00 1691.14 677.30 BRS120A-008 ON SH 120 AT MP 2.76 IN FREMO 10/09/08 2.00 450.00 847.47 685.41 BR 0361-088 US36 AND CHERRYVALE RD 10/16/08 3.00 800.00 504.16 400.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5.00 660.00 662.61 514.16 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 100.95 431.91 546.78 482.07 =============== 213-00460 Landscape Border (3/16x4 In) Lin Foot =============================================== STA0831-106 PARKER RD. (SH 83) MP 65.5 TO 07/10/08 603.00 5.25 4.17 4.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 603.00 5.25 4.17 4.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 603.00 5.25 4.17 4.40 =============== 213-00462 Landscape Border (3/16x5-1/2 In) Lin Foot =============================================== NH 0503-064 US 50:15TH AND 16TH ST IN CAN 04/17/08 526.00 10.00 8.00 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 526.00 10.00 8.00 9.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 526.00 10.00 8.00 9.00 =============== 213-00610 Landscape Log Each =================================================== NH 1602-117 THIS PROJECT IS LOCATED ABOUT 12/04/08 20.00 150.00 378.10 190.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 20.00 150.00 378.10 190.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 150.00 378.10 190.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 137 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00700 Landscape Boulder Each =================================================== C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 212.00 400.00 142.04 150.00 NH 1602-117 THIS PROJECT IS LOCATED ABOUT 12/04/08 35.00 300.00 392.67 320.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 247.00 385.83 156.23 174.09 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 247.00 385.83 156.23 174.09 =============== 213-00705 Landscape Boulder (Special) Each =================================================== NH 1602-117 THIS PROJECT IS LOCATED ABOUT 12/04/08 60.00 200.00 416.28 270.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 60.00 200.00 416.28 270.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 60.00 200.00 416.28 270.00 =============== 214-00000 Landscape Maintenance LUMP SUM =============================================== C 1191-023 FROM MP 0.0 TO MP 2.6 GILPIN 04/03/08 1.00 10500.00 6097.83 1600.00 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 1.00 35000.00 19096.12 3500.00 STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 1.00 10000.00 26602.70 41000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3.00 18500.00 18158.97 15366.67 NH 2854-109 US 285: DEER CREEK INTERCHANG 07/31/08 1.00 18000.00 20518.32 2650.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 18000.00 20518.32 2650.00 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 1.00 10000.00 21792.66 10000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 10000.00 21792.66 10000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5.00 16700.00 19447.70 11750.00 =============== 214-00205 Deciduous Tree (5 Gal) Each =================================================== C 1191-023 FROM MP 0.0 TO MP 2.6 GILPIN 04/03/08 130.00 49.00 57.60 40.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 138 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 214-00205 Deciduous Tree (5 Gal) Each =================================================== IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 100.00 64.00 73.69 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 230.00 55.52 65.60 40.00 NH 1602-117 THIS PROJECT IS LOCATED ABOUT 12/04/08 709.00 70.00 86.13 66.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 709.00 70.00 86.13 66.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 939.00 66.45 78.13 59.63 =============== 214-00215 Deciduous Tree (1.5 In C) Each =================================================== STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 15.00 500.00 281.57 270.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15.00 500.00 281.57 270.00 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 12.00 238.00 358.56 375.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 12.00 238.00 358.56 375.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 27.00 383.56 331.06 316.67 =============== 214-00220 Deciduous Tree (2 In C) Each =================================================== NH5501-013 US 550 N OF NM STATE LINE, MP 04/10/08 8.00 450.00 489.85 490.00 NH 0503-064 US 50:15TH AND 16TH ST IN CAN 04/17/08 3.00 450.00 691.56 400.00 STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 45.00 500.00 380.82 307.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 56.00 490.18 398.20 338.53 STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 3.00 379.00 538.50 480.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 379.00 538.50 480.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 59.00 484.53 404.30 345.72 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 139 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 214-00350 Deciduous Shrub (5 Gal) Each =================================================== IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 850.00 40.00 30.11 30.00 STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 85.00 50.00 34.99 30.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 935.00 40.91 30.55 30.07 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 185.00 45.00 34.57 25.00 BR 0361-088 US36 AND CHERRYVALE RD 10/16/08 236.00 31.00 45.74 37.00 SHE 0821-082 SH 82/SMITH WAY - PITKIN 10/16/08 10.00 85.00 65.00 100.00 NH 1602-117 THIS PROJECT IS LOCATED ABOUT 12/04/08 358.00 50.00 69.62 46.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 789.00 43.59 48.11 39.07 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,724.00 42.14 37.23 34.19 =============== 214-00450 Evergreen Tree (5 Gal) Each =================================================== NH 1602-117 THIS PROJECT IS LOCATED ABOUT 12/04/08 75.00 80.00 114.11 97.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 75.00 80.00 114.11 97.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 75.00 80.00 114.11 97.00 =============== 214-00506 Evergreen Tree (6 Ft)(B-B) Each =================================================== STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 32.00 400.00 335.32 266.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 32.00 400.00 335.32 266.50 NH 2854-109 US 285: DEER CREEK INTERCHANG 07/31/08 15.00 423.00 393.39 420.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 15.00 423.00 393.39 420.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 47.00 407.34 349.15 315.49 =============== 214-00650 Evergreen Shrub (5 Gal) Each =================================================== NH 0503-064 US 50:15TH AND 16TH ST IN CAN 04/17/08 6.00 50.00 191.24 460.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 50.00 191.24 460.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6.00 50.00 191.24 460.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 140 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 214-01010 Brush Layer Cutting Each =================================================== STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 1,500.00 3.00 3.24 5.00 BR 0403-051 US 40 MP 245.85 03/27/08 20.00 28.00 6.50 6.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,520.00 3.33 3.25 5.02 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 2,000.00 3.25 2.43 2.65 STA 009A-001 SH 9 HOOSIER PASS NORTH - PHA 05/01/08 50.00 12.25 5.69 6.50 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 400.00 6.00 11.75 3.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,450.00 3.88 3.04 2.91 NHC040-027 POWERS BLVD - FROM WOODMEN RO 08/21/08 250.00 5.00 6.13 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 250.00 5.00 6.13 3.00 BR 0361-088 US36 AND CHERRYVALE RD 10/16/08 150.00 4.50 2.28 2.25 NH 1602-117 THIS PROJECT IS LOCATED ABOUT 12/04/08 2,281.00 6.00 3.62 2.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,431.00 5.91 3.48 2.39 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,651.00 4.54 3.32 3.21 =============== 215-00000 Transplant Shrub Each =================================================== NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 27.00 20.00 146.00 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 27.00 20.00 146.00 60.00 SHE 0821-082 SH 82/SMITH WAY - PITKIN 10/16/08 14.00 200.00 90.75 50.00 NH 1602-117 THIS PROJECT IS LOCATED ABOUT 12/04/08 616.00 15.00 51.83 61.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 630.00 19.11 52.69 60.76 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 657.00 19.15 55.60 60.72 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 141 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 215-00010 Transplant Tree Each =================================================== NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 15.00 150.00 610.00 500.00 C0702-275 I-70 VAIL PASS 06/26/08 6.00 600.00 1625.00 900.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 21.00 278.57 963.04 614.29 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21.00 278.57 963.04 614.29 =============== 215-00600 Transplant Plug Each =================================================== HB0132-017 SH13 WY STATE LINE SOUTH OVER 03/13/08 250.00 10.00 12.79 52.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 250.00 10.00 12.79 52.00 NH 2871-031 US 287 SOUTH OF LAMAR FROM MP 04/03/08 50.00 10.00 9.12 8.99 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 100.00 5.00 21.90 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 150.00 6.67 17.64 5.00 BRS R200-154 I-25 MP 59.09, MP 65.6, MP 79 09/04/08 25.00 40.00 33.25 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 25.00 40.00 33.25 13.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 425.00 10.59 14.85 33.12 =============== 216-00015 Soil Reten Blanket (Excel) Sq Yard ================================================ HB0132-017 SH13 WY STATE LINE SOUTH OVER 03/13/08 1,525.00 10.00 1.94 1.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,525.00 10.00 1.94 1.40 C 067A-026 SH67 AND CR81 04/10/08 1,500.00 8.00 3.78 2.00 STA 069A-023 SH 69 WESTCLIFFE AREA - CUSTE 06/26/08 1,700.00 2.00 1.74 2.00 C0702-275 I-70 VAIL PASS 06/26/08 2,469.00 11.00 2.81 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,669.00 7.51 2.74 2.44 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 142 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 216-00015 Soil Reten Blanket (Excel) Sq Yard ================================================ NH 1602-117 THIS PROJECT IS LOCATED ABOUT 12/04/08 3,000.00 3.00 3.63 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,000.00 3.00 3.63 3.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10,194.00 6.55 2.81 2.45 =============== 216-00021 Soil Reten Blanket (Cl 1) Sq Yard ================================================ STA069A-024 SH 69 HUERFANO COUNTY 06/26/08 200.00 3.00 2.36 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 200.00 3.00 2.36 2.00 NHC040-027 POWERS BLVD - FROM WOODMEN RO 08/21/08 19,853.00 1.75 1.97 1.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 19,853.00 1.75 1.97 1.70 BRS120A-008 ON SH 120 AT MP 2.76 IN FREMO 10/09/08 3,100.00 1.50 1.97 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,100.00 1.50 1.97 2.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 23,153.00 1.73 1.97 1.74 =============== 216-00022 Soil Reten Blanket (Cl 2) Sq Yard ================================================ NH 2871-031 US 287 SOUTH OF LAMAR FROM MP 04/03/08 7,882.00 5.50 5.51 5.39 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 7,882.00 5.50 5.51 5.39 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,882.00 5.50 5.51 5.39 =============== 216-00023 Soil Reten Blanket (Cl 3) Sq Yard ================================================ STA069A-024 SH 69 HUERFANO COUNTY 06/26/08 138.00 10.00 19.53 18.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 138.00 10.00 19.53 18.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 143 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 216-00023 Soil Reten Blanket (Cl 3) Sq Yard ================================================ BR 0361-088 US36 AND CHERRYVALE RD 10/16/08 800.00 15.00 4.78 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 800.00 15.00 4.78 4.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 938.00 14.26 5.79 6.06 =============== 216-00035 Soil Reten Blanket (Plastic) Sq Yard ================================================ IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 1,340.00 6.75 5.32 4.00 IM 0705-077 I70 WEST OF BURLINGTON EAST I 04/17/08 50.00 12.75 20.56 19.73 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,390.00 6.97 5.63 4.57 NH 2854-109 US 285: DEER CREEK INTERCHANG 07/31/08 388.00 9.25 13.76 19.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 388.00 9.25 13.76 19.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,778.00 7.46 6.92 7.72 =============== 216-00037 Soil Reten Blanket (Coconut) Sq Yard ================================================ NH0504-056 US 50 PASSING LANES EAST OF 5 05/15/08 100.00 3.00 3.17 3.15 STA069A-024 SH 69 HUERFANO COUNTY 06/26/08 144.00 12.00 4.28 4.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 244.00 8.31 3.60 3.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 244.00 8.31 3.60 3.65 =============== 216-00039 Soil Reten Blanket (Straw) Sq Yard ================================================ NH5501-013 US 550 N OF NM STATE LINE, MP 04/10/08 3,250.00 2.50 2.76 3.10 STA0703-334 I-70 FROM BAKERVILLE TO EAST 05/15/08 12,300.00 1.35 1.45 1.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 15,550.00 1.59 1.77 1.60 STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 3,000.00 1.60 1.64 1.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,000.00 1.60 1.64 1.30 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 144 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 216-00039 Soil Reten Blanket (Straw) Sq Yard ================================================ C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 4,840.00 1.55 2.10 1.72 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4,840.00 1.55 2.10 1.72 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 23,390.00 1.58 1.86 1.58 =============== 216-00041 Soil Reten Blanket (S/C) Sq Yard ================================================ HB131A-033 SH 131 ROUTT COUNTY 01/10/08 13,583.00 2.00 2.28 3.75 STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 3,430.00 2.00 2.10 1.70 STA 0831-099 SH 83 AT RUSSELLVILLE ROAD SO 01/17/08 2,760.00 1.75 2.02 1.65 CCR600-303 CHATFIELD STATE PARK MAIN RD, 01/31/08 3,982.00 2.00 1.73 1.60 STA0252-397 I25 NORTHGATE NORTH 02/14/08 40,000.00 1.70 1.66 1.59 STU 0251-329 S OF COLORADO CITY TO CEDARWO 03/06/08 130.00 4.00 2.80 1.36 SHE0702-276 EAGLE COUNTY I-70 MP 171 TO M 03/13/08 6,921.00 2.00 2.07 1.85 SRP083A-032 HIGHWAY 83 AND HODGEN IN EL P 03/20/08 76.00 6.00 4.42 4.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 70,882.00 1.83 1.92 2.04 C 1191-023 FROM MP 0.0 TO MP 2.6 GILPIN 04/03/08 5,580.00 1.40 2.61 2.00 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 40,000.00 1.30 1.84 1.75 IM 0705-077 I70 WEST OF BURLINGTON EAST I 04/17/08 28,000.00 1.55 1.47 1.59 IM 0702-281 I-70 IN DOWD CANYON 04/30/08 9,800.00 2.20 3.78 3.60 STA009A-025 SH9 FROM FAIRPLAY TO HARTSEL 05/01/08 18,500.00 1.80 1.37 1.55 SHE 0761-195 I-76: BURLINGTON CANAL TO BRO 05/15/08 444.00 3.25 1.99 1.60 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 30,286.00 2.00 2.10 1.70 IM 070A-003 I 70 BETWEEN DENVER AND VAIL 06/12/08 1,000.00 1.50 3.23 2.45 C0703-330 I-70 TWIN TUNNELS WESTBOUND 06/12/08 2,645.00 2.25 3.10 4.50 C 1601-060 US 160 MONTEZUMA COUNTY 06/26/08 500.00 3.00 4.94 4.25 STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 2,319.00 2.50 2.22 2.31 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 139,074.00 1.69 1.94 1.90 STA0831-106 PARKER RD. (SH 83) MP 65.5 TO 07/10/08 750.00 2.55 2.14 1.30 STA R400-147 ON SH 52 IN MORGAN COUNTY 07/24/08 550.00 2.25 2.14 1.45 SHE0831-102 PARKER RD: LONG AVE INTERSECT 07/24/08 1,510.00 3.00 1.83 1.42 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 145 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 216-00041 Soil Reten Blanket (S/C) Sq Yard ================================================ NH 2854-109 US 285: DEER CREEK INTERCHANG 07/31/08 3,200.00 1.95 1.98 1.70 SHE R600-310 US285/FED, I-25/120TH, I-270/ 08/14/08 500.00 2.65 1.87 1.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6,510.00 2.34 1.99 1.56 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 17,825.00 1.60 2.10 1.75 NH1601-058 ON US 160, FROM M.P. 21.40 TO 10/09/08 900.00 3.00 4.56 3.00 BR 0361-088 US36 AND CHERRYVALE RD 10/16/08 2,400.00 2.20 3.11 3.04 SHE 0821-082 SH 82/SMITH WAY - PITKIN 10/16/08 1,500.00 2.00 3.59 5.00 C1601-057 ON U.S. 160, APPROXIMATELY M. 12/04/08 8,898.00 2.00 3.11 1.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 31,523.00 1.82 2.43 2.02 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 247,989.00 1.76 2.04 1.94 =============== 216-00045 Soil Reten Mat (Cell) Sq Yard ================================================ C 1601-060 US 160 MONTEZUMA COUNTY 06/26/08 2,080.00 10.50 12.22 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,080.00 10.50 12.22 9.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,080.00 10.50 12.22 9.00 =============== 216-00070 Geocell Confinement Sys Sq Yard ================================================ NH5501-013 US 550 N OF NM STATE LINE, MP 04/10/08 1,084.00 25.00 19.52 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,084.00 25.00 19.52 25.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,084.00 25.00 19.52 25.00 =============== 217-00000 Herbicide Treatment Sq Yard ================================================ STA 0404-044 WEST COLFAX AVE. (US 40) FROM 07/17/08 1,500.00 0.65 1.02 0.30 STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 100.00 2.10 1.79 1.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,600.00 0.74 1.06 0.38 NH 1602-117 THIS PROJECT IS LOCATED ABOUT 12/04/08 2,000.00 0.60 0.81 0.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,000.00 0.60 0.81 0.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,600.00 0.66 0.96 0.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 146 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 217-00020 Herbicide Treatment Hour =================================================== STA 0831-099 SH 83 AT RUSSELLVILLE ROAD SO 01/17/08 2.00 181.00 251.35 255.00 CCR600-303 CHATFIELD STATE PARK MAIN RD, 01/31/08 30.00 120.00 134.19 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 32.00 123.81 143.75 109.69 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 40.00 118.00 139.08 116.00 NH0504-056 US 50 PASSING LANES EAST OF 5 05/15/08 30.00 200.00 143.86 85.00 SHE 0761-195 I-76: BURLINGTON CANAL TO BRO 05/15/08 2.00 223.00 457.94 100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 72.00 155.08 147.38 102.64 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 100.00 150.00 169.06 85.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 100.00 150.00 169.06 85.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 204.00 147.69 159.70 95.10 =============== 218-00000 Noxious Weed Management LUMP SUM =============================================== STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 1.00 5000.00 10054.01 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 5000.00 10054.01 5000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 5000.00 10054.01 5000.00 =============== 240-00000 Wildlife Biologist Hour =================================================== NH 1602-117 THIS PROJECT IS LOCATED ABOUT 12/04/08 40.00 80.00 182.01 78.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 40.00 80.00 182.01 78.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 80.00 182.01 78.00 =============== 250-00010 Envir Health/Safety Mngmt LUMP SUM =============================================== STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 1.00 5000.00 21123.44 23400.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 147 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 250-00010 Envir Health/Safety Mngmt LUMP SUM =============================================== NH 160A-002 DOUBLE TREE BRIDGE ( O-05-AJ) 01/17/08 1.00 3000.00 4350.00 2500.00 IM0252-393 DENVER - I-25 FROM SANTA FE D 02/28/08 1.00 5000.00 2643.10 2457.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 4333.33 10376.61 9452.33 NH5501-013 US 550 N OF NM STATE LINE, MP 04/10/08 1.00 5000.00 7340.92 5000.00 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 1.00 5000.00 16600.00 17000.00 C0703-330 I-70 TWIN TUNNELS WESTBOUND 06/12/08 1.00 7500.00 6536.55 3800.00 STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 1.00 7500.00 7188.43 3331.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 6250.00 8580.73 7282.81 STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 1.00 6000.00 1699.11 1550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1.00 6000.00 1699.11 1550.00 C1601-057 ON U.S. 160, APPROXIMATELY M. 12/04/08 1.00 5000.00 8258.77 3100.00 C0063-027 US 6 LOMA STR H-01-E, MP 13.1 12/11/08 1.00 7500.00 2740.16 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 6250.00 4809.64 1650.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 5650.00 6872.24 6233.83 =============== 250-00050 Monitoring Technician Hour =================================================== STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 100.00 100.00 117.50 110.00 IM0252-393 DENVER - I-25 FROM SANTA FE D 02/28/08 12.00 85.00 97.21 90.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 112.00 98.39 115.33 107.89 NH5501-013 US 550 N OF NM STATE LINE, MP 04/10/08 16.00 100.00 109.36 78.00 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 90.00 100.00 106.67 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 106.00 100.00 107.37 105.17 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 148 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 250-00050 Monitoring Technician Hour =================================================== STA0853-069 US 85 & COLLINS ST (EATON) 12/04/08 8.00 100.00 156.13 133.00 C1601-057 ON U.S. 160, APPROXIMATELY M. 12/04/08 8.00 100.00 285.96 58.00 C0063-027 US 6 LOMA STR H-01-E, MP 13.1 12/11/08 40.00 100.00 100.56 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 56.00 100.00 125.36 48.71 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 274.00 99.34 117.06 94.74 =============== 250-00110 Health and Safety Officer Hour =================================================== STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 80.00 130.00 157.50 140.00 NH 160A-002 DOUBLE TREE BRIDGE ( O-05-AJ) 01/17/08 2.00 500.00 575.00 450.00 IM0252-393 DENVER - I-25 FROM SANTA FE D 02/28/08 4.00 120.00 145.70 135.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 86.00 138.14 161.86 146.98 NH5501-013 US 550 N OF NM STATE LINE, MP 04/10/08 40.00 150.00 146.83 70.00 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 70.00 150.00 156.67 160.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 110.00 150.00 151.42 127.27 STA0853-069 US 85 & COLLINS ST (EATON) 12/04/08 8.00 125.00 212.37 173.00 C1601-057 ON U.S. 160, APPROXIMATELY M. 12/04/08 4.00 130.00 272.74 68.00 C0063-027 US 6 LOMA STR H-01-E, MP 13.1 12/11/08 20.00 140.00 103.26 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 32.00 135.00 143.54 70.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 228.00 143.42 152.54 126.74 =============== 250-00120 Material Sampling and Delivery Each =================================================== STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 30.00 160.00 172.49 130.00 NH 160A-002 DOUBLE TREE BRIDGE ( O-05-AJ) 01/17/08 1.00 500.00 1107.50 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 31.00 170.97 187.82 174.19 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 149 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 250-00120 Material Sampling and Delivery Each =================================================== NH5501-013 US 550 N OF NM STATE LINE, MP 04/10/08 8.00 200.00 217.83 140.00 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 10.00 200.00 600.00 600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 18.00 200.00 364.82 395.56 C1601-057 ON U.S. 160, APPROXIMATELY M. 12/04/08 2.00 200.00 232.24 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 200.00 232.24 80.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 51.00 182.35 255.45 248.63 =============== 250-00200 Material Handling (Stockpile) Cubic Yard ============================================= NH 160A-002 DOUBLE TREE BRIDGE ( O-05-AJ) 01/17/08 1.00 500.00 352.50 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 500.00 352.50 500.00 NH5501-013 US 550 N OF NM STATE LINE, MP 04/10/08 75.00 40.00 29.40 12.00 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 200.00 40.00 33.33 43.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 275.00 40.00 31.65 34.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 276.00 41.67 32.26 36.23 =============== 250-00210 Solid Waste Disposal Cubic Yard ============================================= NH 160A-002 DOUBLE TREE BRIDGE ( O-05-AJ) 01/17/08 1.00 500.00 1000.00 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 500.00 1000.00 500.00 NH5501-013 US 550 N OF NM STATE LINE, MP 04/10/08 70.00 40.00 88.18 30.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 150 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 250-00210 Solid Waste Disposal Cubic Yard ============================================= NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 100.00 40.00 74.00 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 170.00 40.00 82.27 59.41 STA0853-069 US 85 & COLLINS ST (EATON) 12/04/08 12.00 105.00 177.82 96.00 C1601-057 ON U.S. 160, APPROXIMATELY M. 12/04/08 25.00 100.00 173.38 60.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 37.00 101.62 175.24 71.68 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 208.00 53.17 108.62 63.71 =============== 250-00220 Hazardous Waste Disposal Cubic Yard ============================================= STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 21,300.00 50.00 74.18 55.00 NH 160A-002 DOUBLE TREE BRIDGE ( O-05-AJ) 01/17/08 1.00 500.00 430.00 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 21,301.00 50.02 74.18 55.02 NH5501-013 US 550 N OF NM STATE LINE, MP 04/10/08 5.00 300.00 289.95 250.00 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 100.00 300.00 146.67 140.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 105.00 300.00 159.69 145.24 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 21,406.00 51.25 74.51 55.46 =============== 250-00310 Water Treatment M Gallon =============================================== STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 60.00 670.00 682.91 530.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 60.00 670.00 682.91 530.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 60.00 670.00 682.91 530.00 =============== 304-01000 ABC (CL 1) Ton ==================================================== HB131A-033 SH 131 ROUTT COUNTY 01/10/08 58,944.00 15.00 21.67 16.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 58,944.00 15.00 21.67 16.50 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 151 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-01000 ABC (CL 1) Ton ==================================================== SHE 0501-056 US 50 AND 28.5 RD IN GRAND JU 04/10/08 2,520.00 28.00 27.85 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,520.00 28.00 27.85 25.00 C0063-027 US 6 LOMA STR H-01-E, MP 13.1 12/11/08 3,935.00 20.00 21.59 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,935.00 20.00 21.59 21.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 65,399.00 15.80 21.80 17.10 =============== 304-01005 ABC (CL 1) Cubic Yard ============================================= STA133A-034 133/187 RESURFACING 01/03/08 8.00 100.00 120.00 50.00 HB135A-024 SH 135 CRESTED BUTTE SOUTH 02/14/08 8.00 100.00 128.56 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16.00 100.00 124.89 100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 100.00 124.89 100.00 =============== 304-02000 ABC (CL 2) Ton ==================================================== HB 0131-050 SH 13 NORTH OF RIFLE 02/07/08 3,043.00 25.00 29.23 30.00 STA 017A-010 BEGINNING OF SH 17 FROM MP 69 02/14/08 20,857.00 14.00 17.08 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 23,900.00 15.40 18.89 14.29 NH5501-013 US 550 N OF NM STATE LINE, MP 04/10/08 51,785.00 12.00 16.19 13.00 C 090A-002 ON S.H. 90 FROM M.P. 10.6 TO 05/22/08 4,214.00 25.00 30.58 22.08 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 55,999.00 12.98 16.93 13.68 NH1601-058 ON US 160, FROM M.P. 21.40 TO 10/09/08 5,923.00 15.00 21.38 20.90 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 152 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-02000 ABC (CL 2) Ton ==================================================== NH 1602-117 THIS PROJECT IS LOCATED ABOUT 12/04/08 7,182.00 19.00 20.52 17.00 C1601-057 ON U.S. 160, APPROXIMATELY M. 12/04/08 41,476.00 20.00 16.97 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 54,581.00 19.33 17.73 14.38 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 134,480.00 15.99 17.57 14.08 =============== 304-03000 ABC (CL 3) Ton ==================================================== SHE 0821-082 SH 82/SMITH WAY - PITKIN 10/16/08 3,637.00 30.00 29.00 32.01 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3,637.00 30.00 29.00 32.01 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,637.00 30.00 29.00 32.01 =============== 304-03005 ABC (CL 3) Cubic Yard ============================================= C0702-284 I-70 TRUCK PARKING AT DOTSERO 09/11/08 7,280.00 30.00 38.60 35.11 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7,280.00 30.00 38.60 35.11 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,280.00 30.00 38.60 35.11 =============== 304-04000 ABC (CL 4) Ton ==================================================== STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 4,327.00 30.00 17.91 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4,327.00 30.00 17.91 12.00 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 39.00 56.00 56.33 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 39.00 56.00 56.33 35.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,366.00 30.23 18.67 12.21 =============== 304-05000 ABC (CL 5) Ton ==================================================== IM 0704-207 I-70 FROM I-225 TO TOWER RD 04/17/08 279.00 40.00 57.75 56.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 279.00 40.00 57.75 56.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 279.00 40.00 57.75 56.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 153 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-06000 ABC (CL 6) Ton ==================================================== HB131A-033 SH 131 ROUTT COUNTY 01/10/08 23,583.00 16.00 24.07 21.00 NH0853-066 US 85C SH 60 TO LASALLE 01/10/08 1,997.00 16.00 20.62 15.00 STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 7,090.00 20.00 17.14 13.00 IM0701-189 PALISADE EAST 01/17/08 3,852.00 24.00 25.75 23.50 STA 0831-099 SH 83 AT RUSSELLVILLE ROAD SO 01/17/08 54.00 46.00 68.72 35.30 C0253-199 I25 RUBBILIZATION N OF SH 56 01/24/08 38,098.00 15.00 18.52 15.05 SHE 050A-007 SH 50 BETWEEN MORRIS/FORTINO 01/31/08 8,016.00 20.00 29.40 16.00 HB 0131-050 SH 13 NORTH OF RIFLE 02/07/08 732.00 35.00 35.71 40.00 STA 017A-010 BEGINNING OF SH 17 FROM MP 69 02/14/08 8,276.00 16.00 19.37 14.50 C 0253-202 I-25 02/15/08 3,000.00 35.00 35.00 35.00 HB0132-017 SH13 WY STATE LINE SOUTH OVER 03/13/08 22,710.00 22.00 19.83 17.00 SRP083A-032 HIGHWAY 83 AND HODGEN IN EL P 03/20/08 21.00 60.00 96.63 28.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 117,429.00 18.24 21.47 17.48 C 1191-023 FROM MP 0.0 TO MP 2.6 GILPIN 04/03/08 3,128.00 22.00 24.79 25.00 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 04/10/08 1,728.00 21.00 23.53 15.00 NH5501-013 US 550 N OF NM STATE LINE, MP 04/10/08 22,266.00 20.00 18.52 16.00 SHE 0501-056 US 50 AND 28.5 RD IN GRAND JU 04/10/08 771.00 25.00 29.92 27.00 C 067A-026 SH67 AND CR81 04/10/08 527.40 16.00 22.18 25.00 NH 0503-064 US 50:15TH AND 16TH ST IN CAN 04/17/08 9,346.00 25.00 27.89 24.00 STA 0343-026 ON US 34 IN YUMA COUNTY 04/17/08 4,236.00 18.00 39.17 35.00 IM 0705-077 I70 WEST OF BURLINGTON EAST I 04/17/08 53.00 52.00 39.16 57.31 STA 009A-001 SH 9 HOOSIER PASS NORTH - PHA 05/01/08 2,207.00 27.00 29.58 36.00 NH0504-056 US 50 PASSING LANES EAST OF 5 05/15/08 18,680.00 16.00 17.95 15.70 STA0703-334 I-70 FROM BAKERVILLE TO EAST 05/15/08 2,308.00 25.00 32.52 24.10 STS 1151-021 SH 115 AT CR F45 IN FREMONT C 05/15/08 1,156.00 24.00 23.09 22.50 C 090A-002 ON S.H. 90 FROM M.P. 10.6 TO 05/22/08 1,124.00 26.00 35.43 27.15 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 1,000.00 30.00 23.00 32.00 C119A-054 SH 119 FROM MP 6.5 TO MP 8.0 06/19/08 294.00 36.00 31.18 25.50 SHE3921-008 SH 392 @ WCR 31(HES) 06/19/08 685.00 15.00 22.42 16.00 STA 069A-023 SH 69 WESTCLIFFE AREA - CUSTE 06/26/08 2,113.68 20.00 28.34 24.00 STA069A-024 SH 69 HUERFANO COUNTY 06/26/08 350.70 40.00 43.14 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 71,973.78 20.44 21.65 20.43 NH 2854-109 US 285: DEER CREEK INTERCHANG 07/31/08 216.00 35.00 52.92 24.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 216.00 35.00 52.92 24.00 SHE 0821-082 SH 82/SMITH WAY - PITKIN 10/16/08 538.00 40.00 33.65 33.59 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 154 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-06000 ABC (CL 6) Ton ==================================================== NH 1602-117 THIS PROJECT IS LOCATED ABOUT 12/04/08 4,029.00 24.00 24.05 21.00 SHE 0451-009 SH45 (PUEBLO BLVD) AND RED CR 12/04/08 515.00 25.00 35.80 34.00 C1601-057 ON U.S. 160, APPROXIMATELY M. 12/04/08 12,396.00 22.00 19.48 21.00 C0063-027 US 6 LOMA STR H-01-E, MP 13.1 12/11/08 1,760.00 22.00 23.59 21.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 19,238.00 23.00 21.41 21.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 208,856.78 19.45 21.57 18.89 =============== 304-06007 ABC (CL 6) Cubic Yard ============================================= STA133A-034 133/187 RESURFACING 01/03/08 3.00 55.00 182.00 50.00 STA 093A-007 ON SH 93 IN BOULDER COUNTY 01/24/08 135.00 25.00 49.49 22.50 CCR600-303 CHATFIELD STATE PARK MAIN RD, 01/31/08 758.00 27.00 31.30 15.60 HB135A-024 SH 135 CRESTED BUTTE SOUTH 02/14/08 3.00 100.00 216.25 150.00 STA0252-397 I25 NORTHGATE NORTH 02/14/08 733.00 45.00 34.63 33.89 SHE0702-276 EAGLE COUNTY I-70 MP 171 TO M 03/13/08 1,664.00 60.00 93.33 30.00 STA052A-029 ON SH 52 IN WELD COUNTY 03/20/08 65.00 30.00 39.27 23.06 NH 1603-025 US 160 ALAMOSA MILL AND FILL 03/27/08 30.00 60.00 56.67 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,391.00 47.44 57.41 27.49 SHE 2854-114 SH 285-BRADEY CT. 05/01/08 100.00 45.00 88.55 150.00 NH0063-024 US 6 EAGLE 05/22/08 725.00 30.00 81.52 90.00 C0703-337 I-70 EMPIRE JCT. EAST OVERLAY 06/05/08 30.00 65.00 43.12 42.00 C0702-275 I-70 VAIL PASS 06/26/08 114.00 99.00 99.25 110.00 STA0342-037 U.S. 34 BUSINESS ROUTE FROM S 06/26/08 41,039.00 19.00 24.28 18.84 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 42,008.00 19.50 24.83 20.64 STA0831-106 PARKER RD. (SH 83) MP 65.5 TO 07/10/08 1,248.00 35.00 34.31 25.20 STA R400-147 ON SH 52 IN MORGAN COUNTY 07/24/08 1,482.00 26.00 47.37 40.00 SHE0831-102 PARKER RD: LONG AVE INTERSECT 07/24/08 312.00 25.00 48.69 45.00 SHE R600-310 US285/FED, I-25/120TH, I-270/ 08/14/08 102.00 46.00 99.10 114.50 STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 15.00 58.00 52.21 85.00 C0702-284 I-70 TRUCK PARKING AT DOTSERO 09/11/08 4,368.00 30.00 44.59 39.78 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7,527.00 30.11 44.04 38.72 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 930.00 25.00 28.30 17.71 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 155 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-06007 ABC (CL 6) Cubic Yard ============================================= BRS120A-008 ON SH 120 AT MP 2.76 IN FREMO 10/09/08 1,394.00 40.00 25.44 16.01 NH1601-058 ON US 160, FROM M.P. 21.40 TO 10/09/08 2,310.00 14.00 40.75 23.20 BR 0361-088 US36 AND CHERRYVALE RD 10/16/08 1,098.00 21.00 33.40 35.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 5,732.00 23.45 31.80 22.82 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 58,658.00 22.86 28.30 23.57 =============== 304-06008 ABC (CL 6) (Spec) Cubic Yard ============================================= NH0853-066 US 85C SH 60 TO LASALLE 01/10/08 6,970.00 11.00 29.65 22.00 NH0342-048 US 34 IN WELD COUNTY 02/07/08 5,472.00 23.00 26.04 24.00 STA 072A-030 SH 72, 64TH AVE TO 84TH PKWY 03/13/08 225.00 40.00 35.40 26.00 STA052A-029 ON SH 52 IN WELD COUNTY 03/20/08 236.00 30.00 27.98 22.42 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 12,903.00 16.94 28.79 22.93 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12,903.00 16.94 28.79 22.93 =============== 304-06009 ABC (CL 6) (Spec) Ton ==================================================== STA009A-025 SH9 FROM FAIRPLAY TO HARTSEL 05/01/08 5,998.00 15.25 26.48 18.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 5,998.00 15.25 26.48 18.45 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,998.00 15.25 26.48 18.45 =============== 304-07000 ABC (CL 7) Ton ==================================================== NH 0821-085 SH82 EAGLE COUNTY 01/03/08 1,589.00 22.00 45.00 30.00 STA133A-034 133/187 RESURFACING 01/03/08 6,119.00 25.00 26.00 20.00 HB135A-024 SH 135 CRESTED BUTTE SOUTH 02/14/08 4,341.00 30.00 30.11 23.00 SHE0702-276 EAGLE COUNTY I-70 MP 171 TO M 03/13/08 3,007.20 34.00 37.33 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15,056.20 27.92 30.88 23.92 NH0503-065 3 MILES WEST OF COTOPAXI 08/28/08 40.00 50.00 82.90 119.47 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 40.00 50.00 82.90 119.47 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15,096.20 27.98 31.01 24.17 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 156 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-07005 ABC (CL 7) Cubic Yard ============================================= STA 093A-007 ON SH 93 IN BOULDER COUNTY 01/24/08 450.00 24.00 31.63 32.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 450.00 24.00 31.63 32.20 IM 0705-077 I70 WEST OF BURLINGTON EAST I 04/17/08 16,584.00 21.00 21.09 9.76 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16,584.00 21.00 21.09 9.76 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 17,034.00 21.08 21.42 10.35 =============== 304-07009 ABC (CL 7) (Spec) Ton ==================================================== STA 0343-026 ON US 34 IN YUMA COUNTY 04/17/08 982.00 15.00 13.67 1.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 982.00 15.00 13.67 1.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 982.00 15.00 13.67 1.00 =============== 304-09000 ABC (Spec) Cubic Yard ============================================= IM 0252-392 I-25, TOMAH ROAD TO DOUGLAS L 01/17/08 1,757.00 27.00 31.20 26.00 SHE0741-016 THE INTERSECTION OF SH 74 AND 02/14/08 60.00 45.00 57.30 38.00 STA 079A-011 SH40 / SH79, SH40 (309.26-31 02/28/08 728.00 30.00 24.39 19.50 NH 1603-025 US 160 ALAMOSA MILL AND FILL 03/27/08 258.00 60.00 40.92 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2,803.00 31.20 29.81 25.86 NH 1602-112 US 160 THROUGH BODO PARK 06/05/08 4,086.00 36.00 15.67 6.00 C0702-275 I-70 VAIL PASS 06/26/08 6.00 70.00 290.00 450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4,092.00 36.05 16.20 6.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,895.00 34.08 24.19 14.46 =============== 304-09014 ABC (Spec) Ton ==================================================== STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 5.00 60.00 344.73 270.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 157 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 304-09014 ABC (Spec) Ton ==================================================== NH 2851-004 US 285 RESURFACE FROM NEW MEX 02/07/08 4,642.00 20.00 20.60 21.41 C 5502-063 US 550 SILVERTON TO RED MTN P 02/07/08 9,320.00 15.00 47.50 38.00 STA 017A-010 BEGINNING OF SH 17 FROM MP 69 02/14/08 3,998.00 18.00 23.98 19.50 NH 1602-116 SOUTH FORK EAST 02/14/08 2,792.00 30.00 22.22 25.86 STU 0251-329 S OF COLORADO CITY TO CEDARWO 03/06/08 14,729.00 18.00 11.96 13.81 IM0703-327 I-70 SILVERTHORNE TO EJMT 03/20/08 1,460.00 18.00 22.34 15.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 36,946.00 18.41 23.38 22.49 NH5501-013 US 550 N OF NM STATE LINE, MP 04/10/08 12,671.00 20.00 20.43 17.00 NH0504-056 US 50 PASSING LANES EAST OF 5 05/15/08 3,977.00 20.00 12.43 5.98 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 16,648.00 20.00 18.29 14.37 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 10/09/08 7,565.00 20.00 17.21 15.38 PLH 150A-007 INTERSECTION OF US 160 & SH 1 10/09/08 2,947.00 21.00 30.00 20.00 NH 1602-117 THIS PROJECT IS LOCATED ABOUT 12/04/08 1,334.00 26.00 26.60 30.00 C1601-057 ON U.S. 160, APPROXIMATELY M. 12/04/08 9,648.00 23.00 30.18 27.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 21,494.00 21.86 22.96 22.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 75,088.00 19.75 22.00 20.59 =============== 304-09055 ABC (Blotter) Ton ==================================================== STA139A-029 N OF DOUGLAS PASS CHIP SEALS 01/03/08 50.00 25.00 34.08 20.30 STA1251-006 WINDY GAP RES-GRAND COUNTY 03/27/08 15.00 25.00 6.50 1.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 65.00 25.00 30.48 15.85 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 65.00 25.00 30.48 15.85 =============== 306-01000 Reconditioning Sq Yard ================================================ NH 0503-064 US 50:15TH AND 16TH ST IN CAN 04/17/08 3,451.00 2.50 7.65 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,451.00 2.50 7.65 6.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,451.00 2.50 7.65 6.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 158 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 307-00000 Hydrated Lime Ton ==================================================== STA133A-034 133/187 RESURFACING 01/03/08 542.00 150.00 181.00 165.00 STU 0251-329 S OF COLORADO CITY TO CEDARWO 03/06/08 1,275.00 140.00 137.80 136.99 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,817.00 142.98 146.58 145.35 STA 009A-001 SH 9 HOOSIER PASS NORTH - PHA 05/01/08 191.00 151.00 185.75 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 191.00 151.00 185.75 200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,008.00 143.75 149.99 150.54 =============== 307-00075 Fly Ash Ton ==================================================== STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 470.00 55.00 97.09 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 470.00 55.00 97.09 80.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 470.00 55.00 97.09 80.00 =============== 307-00250 Fly Ash Tr Subgrade Sq Yard ================================================ STU M193-001 ARAPAHOE ROAD AND (SH177) UNI 08/21/08 11,496.00 6.25 2.18 1.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 11,496.00 6.25 2.18 1.90 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,496.00 6.25 2.18 1.90 =============== 310-00608 Full Depth Reclam. of HMA Pvmt (0-8 in.) Sq Yard ================================================ HB131A-033 SH 131 ROUTT COUNTY 01/10/08 43,733.00 3.00 2.16 1.95 STA 079A-011 SH40 / SH79, SH40 (309.26-31 02/28/08 6,712.00 5.00 2.48 2.01 HB0132-017 SH13 WY STATE LINE SOUTH OVER 03/13/08 54,705.00 2.50 2.63 1.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 105,150.00 2.87 2.45 1.80 C1601-057 ON U.S. 160, APPROXIMATELY M. 12/04/08 73,639.00 2.00 3.04 2.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 73,639.00 2.00 3.04 2.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 178,789.00 2.51 2.70 2.21 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 159 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 310-00610 Full Depth Reclam. of HMA Pvmt (8-12 in) Sq Yard ================================================ HB131A-033 SH 131 ROUTT COUNTY 01/10/08 13,120.00 3.50 2.50 2.45 STA 079A-011 SH40 / SH79, SH40 (309.26-31 02/28/08 22,275.00 5.00 3.11 2.78 HB0132-017 SH13 WY STATE LINE SOUTH OVER 03/13/08 13,676.00 3.00 3.09 2.15 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 49,071.00 4.04 2.98 2.52 STA 0343-026 ON US 34 IN YUMA COUNTY 04/17/08 64,381.00 2.50 2.30 2.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 64,381.00 2.50 2.30 2.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 113,452.00 3.17 2.73 2.45 =============== 310-00614 Full Depth Reclam of HMA Pvmt (12-16 in) Sq Yard ================================================ STA 0343-026 ON US 34 IN YUMA COUNTY 04/17/08 1,732.00 3.25 3.12 2.45 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,732.00 3.25 3.12 2.45 NH1601-058 ON US 160, FROM M.P. 21.40 TO 10/09/08 52,822.00 4.50 6.35 5.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 52,822.00 4.50 6.35 5.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 54,554.00 4.46 6.29 5.40 =============== 403-00720 HMA (Patching) (Asph) Ton ==================================================== NH 0821-085 SH82 EAGLE COUNTY 01/03/08 20.00 330.00 292.00 234.00 HB131A-033 SH 131 ROUTT COUNTY 01/10/08 50.00 150.00 228.20 125.00 NH0853-066 US 85C SH 60 TO LASALLE 01/10/08 850.00 110.00 108.46 75.00 STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 01/10/08 50.00 100.00 164.21 130.00 IM0701-189 PALISADE EAST 01/17/08 627.00 125.00 159.44 170.00 STA 0831-099 SH 83 AT RUSSELLVILLE ROAD SO 01/17/08 50.00 187.00 152.84 122.00 IM 0252-392 I-25, TOMAH ROAD TO DOUGLAS L 01/17/08 100.00 162.00 139.85 95.00 NH0342-043 ON US 34 IN WELD COUNTY 01/24/08 200.00 120.00 117.89 85.00 STA 093A-007 ON SH 93 IN BOULDER COUNTY 01/24/08 157.00 120.00 127.73 120.00 C0253-199 I25 RUBBILIZATION N OF SH 56 01/24/08 500.00 130.00 133.33 110.00 COLORADO DEPARTMENT OF TRANSPORTATION 15:03 Thursday, February 19, 2009 160 ITEM UNIT COSTS BY PROJECTS -- 2008 COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET