Part 1 Colorado Department of Transporation 16:10 Tuesday, January 25, 2005 1 2004 Cost Data - Maintenance PROJECTS BID FROM 01/01/04 THROUGH 12/31/04 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 04010803 COLORADO SIGNAL COMPANY, INC. 7 $55,452.00 69.51 MTCE 06-040 VARIOUS LOCATIONS IN REGION 6 6 U 04010806 UNITED RENTALS HIGHWAY TECHNOLOGIES 5 $290,796.88 82.65 MTCE 01-032 R-1 STENCIL MARKING 1 R 04010807 UNITED RENTALS HIGHWAY TECHNOLOGIES 3 $811,886.24 84.39 MTCE 01-035 R-1 STRIPING 1 R 04010810 UNITED RENTALS HIGHWAY TECHNOLOGIES 4 $261,030.00 104.63 MTCE 01-033 FAIRPLAY - MORRISON, EPOXY 1 M 04011501 WARNING LITES & EQUIPMENT, INC. 4 $369,397.50 71.99 MTCE 01-037 R-1 SIGNING 1 R 04012904 THE SIGN CREW, INCORPORATED 6 $99,949.00 89.30 MTCE 06-039 R-6, SIGN POST REPLACEMENT 6 U 04020508 COLORADO STRIJPE WRIGHT LTD 3 $1,083,167.50 107.30 MTCE 02-015 REGION 2 STRIPING 2 M 04021205 G.A. WESTERN CONSTRUCTION CO. 4 $99,346.50 68.16 MTCE 03-015 R3 EXPANSION JOINT REPAIR 3 M 04031107 KOLBE STRIPING INC. 3 $235,667.00 98.62 MTCE 04-050 R-4 EPOXY SH 34 EAST 4 M 04031108 FRONT RANGE BARRICADE 5 $104,369.00 103.25 MTCE 04-047 R-4 SIGNS SH 14 CENTRAL 4 M 04031801 DKS ENTERPRISES INC. 4 $54,500.40 109.00 MTCE 06-041 SH 6 AT W. 19TH STREET 6 U 04031805 TLM CONSTRUCTORS, INC. 4 $1,804,674.00 124.10 MTCE 04-049 CONCRETE SLABS ON I-25 4 U 04031806 WARNING LITES & EQUIPMENT, INC. CONTRACT REJ - NO REASON GIVEN MTCE 04-048 R-4, EPOXY PAVEMENT MARKING 4 M 04040106 TLM CONSTRUCTORS, INC. 4 $73,364.00 55.72 MTCE 01-039 I70, EAST OF DENVER 1 P 04042202 KOLBE STRIPING INC. 4 $1,173,937.00 78.50 MTCE 01-034 REGION 1 FY 05 STRIPING 1 R 04042204 SLOAN CONTRACTING, INC. 3 $248,649.25 103.99 MTCE 05-032 R5 - FENCING 5 M 04060305 C & D ELECTRIC 7 $260,150.00 54.29 MTCE 02-017 REGION 2 STREET LIGHTING 2 R Colorado Department of Transporation 16:10 Tuesday, January 25, 2005 2 2004 Cost Data - Maintenance PROJECTS BID FROM 01/01/04 THROUGH 12/31/04 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 04060306 UNITED RENTALS HIGHWAY TECHNOLOGIES 4 $1,236,174.00 94.23 MTCE 02-018 REGION 2 STRIPING 2 R 04061707 STURGEON ELECTRIC COMPANY, INC 6 $162,472.75 96.41 MTCE 06-044 R-6 SIGNAL INTERSECTIONS 6 U 04062401 STURGEON ELECTRIC COMPANY, INC 6 $313,992.00 65.47 MTCE 01-036 R-1 CONTROLLER CABINETS 1 R 04072201 FRONT RANGE STRIPING 6 $278,940.66 80.93 MTCE 04-052 FY 05 REGION 4 STENCIL MARKING 4 U 04072904 JALISCO INTERNATIONAL, INC. 2 $448,460.00 100.25 MTCE 06-042 R6 - EXPANSION JOINT REPAIR 6 U 04072905 AMERICAN CIVIL CONSTRUCTORS, INC. CONTRACT REJ - NO REASON GIVEN MTCE 06-043 R6 - BRIDGE RAIL REPLACEMENT 6 U 04072906 DKS ENTERPRISES INC. 3 $658,250.00 122.57 MTCE 01-041 REGION 1 HIGHWAY LIGHTING 1 R 04072907 INTERMOUNTAIN SLURRY SEAL, INC. CONTRACT REJ - NO REASON GIVEN MTCE 05-033 US 160, EAST OF PAGOSA SPRINGS 5 M 04072908 INTERMOUNTAIN SLURRY SEAL, INC. CONTRACT REJ - NO REASON GIVEN MTCE 05-034 US 550, SOUTH OF DURANGO 5 M 04072909 PREMIER PAVING, INC. 3 $321,226.20 82.77 MTCE 01-040 I-25, NEAR LARKSPUR 1 R 04072910 FRONT RANGE BARRICADE 6 $362,136.80 77.70 MTCE 03-018 R-3 SIGN REPLACEMENT 3 R 04080504 UNITED RENTALS HIGHWAY TECHNOLOGIES 4 $287,609.21 77.02 MTCE 04-048 FY 05 R 4 QUALITY EPOXY PAVEME 4 M 04080506 WARNING LITES & EQUIPMENT, INC. 4 $1,347,728.00 79.62 MTCE 04-055 R-4 EPOXY EAST 4 M 04080507 KOLBE STRIPING INC. 4 $735,610.00 72.91 MTCE 04-054 R-4 EPOXY WEST 4 M 04081202 UNITED RENTALS HIGHWAY TECHNOLOGIES 3 $967,100.00 78.88 MTCE 06-049 VARIOUS R-6 STRIPING 6 U 04081205 WARNING LITES & EQUIPMENT, INC. 3 $167,806.50 93.38 MTCE 04-053 R-4 SIGNS, SH 14 WEST 4 M 04081903 ASPHALT PAVING CO. 4 $1,055,255.14 42.80 MTCE 06-046 I-70 & C-470 ALTERNATE PAVEMEN 6 U Colorado Department of Transporation 16:10 Tuesday, January 25, 2005 3 2004 Cost Data - Maintenance PROJECTS BID FROM 01/01/04 THROUGH 12/31/04 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 04081905 WARNING LITES & EQUIPMENT, INC. 3 $384,111.00 115.34 MTCE 01-043 I-70, LIMON TO KANSAS STATELIN 1 P 04081906 IDEAL FENCING CORPORATION CONTRACT REJ - NO REASON GIVEN MTCE 03-019 R-3, GUARDRAIL REPAIRS 3 M 04081907 G.A. WESTERN CONSTRUCTION CO. CONTRACT REJ - NO REASON GIVEN MTCE 03-020 R3, EXPANSION JOINT REPAIRS ON 3 M 04081908 G.A. WESTERN CONSTRUCTION CO. 3 $599,034.10 127.34 MTCE 03-017 R-3, EXPANSION JOINT REPAIRS 3 M 04082603 AMERICAN CIVIL CONSTRUCTORS, INC. 2 $388,522.50 94.23 MTCE 06-043R R-6, BRIDGE RAIL REPLACEMENT 6 U 04090203 FOUR CORNERS MATERIALS 4 $315,816.70 99.67 MTCE 05-034R US 550, SOUTH OF DURANGO 5 M 04091606 IDEAL FENCING CORPORATION 2 $175,864.00 93.64 MTCE 03-019R HWYS 70, 82, 50, 133, 141, 92, 3 M 04091607 G.A. WESTERN CONSTRUCTION CO. 1 $79,705.00 96.15 MTCE 03-020R R3 EXPANSION JOINT REPAIRS ON 3 M 04100702 PREMIER PAVING, INC. 6 $1,060,713.10 95.41 MTCE 06-045 I-76, WADSWORTH TO FEDERAL 6 U 04101403 K.E.C.I. COLORADO, INC. 4 $28,250.00 98.26 MTCE 06-052 INTERSTATE 25 SB AT EXIT 213 6 U 04102802 INTERFACE COMMUNICATIONS, COMPANY 8 $261,614.49 63.21 MTCE 01-038 I-70 & SH 91 VMS/ SNOW GATES 1 R ======= ================ ====== TOTALS 161 $18,662,728.42 84.60 Part 2 Colorado Department of Transporation 16:10 Tuesday, January 25, 2005 1 2004 Cost Data - Maintenance INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/04 THROUGH 12/31/04 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 202-00170 Grinding And Texturing Concrete Pavement 5,360 Sq Yard 48,240.00 9.00 202-00220 Removal of Asphalt Mat 120 Sq Yard 1,412.40 11.77 202-00240 Removal of Asphalt Mat (Planing) 135,767 Sq Yard 128,978.65 0.95 202-00250 Removal of Pavement Marking 3,596,261 Sq Foot 898,362.66 0.25 202-00425 Removal of Bridge Railing 55 Lin Foot 1,650.00 30.00 202-00503 Removal of Portions of Present Structure 316 Sq Yard 50,560.00 160.00 202-00504 Removal of Expansion Device 3,039 Lin Foot 168,101.70 55.31 202-00700 Removal of Light Standard 3 Each 1,548.00 516.00 202-00810 Removal of Ground Sign 3,242 Each 63,305.00 19.53 202-00821 Removal of Sign Panel 2,930 Each 41,779.00 14.26 202-00825 Removal of Flashing Beacon 3 Each 375.00 125.00 202-00855 Removal of Traffic Signal Controller Cabinet 23 Each 6,900.00 300.00 202-00895 Removal of Impact Attenuator 1 Each 2,750.00 2,750.00 202-01000 Removal of Fence 102,732 Lin Foot 51,365.75 0.50 202-01030 Removal of Road Closure Gate 3 Each 564.00 188.00 202-01130 Removal of Guardrail Type 3 1,096 Lin Foot 5,697.00 5.20 202-01140 Removal of Guardrail Type 4 206 Lin Foot 6,400.00 31.07 202-01300 Removal of End Anchorage 70 Each 11,550.00 165.00 202-04002 Clean Culvert 4 Each 600.00 150.00 202-05026 Sawing Asphalt Material (6 Inch) 600 Lin Foot 3,240.00 5.40 203-00010 Unclassified Excavation (Complete In Place) 180 Cubic Yard 2,898.00 16.10 203-00060 Embankment Material (Complete In Place) 1,741 Cubic Yard 13,587.00 7.80 203-01500 Blading 20 Hour 2,660.00 133.00 203-01597 Potholing 10 Hour 1,120.00 112.00 208-00045 Concrete Washout Structure 12 Each 3,985.00 332.08 208-00050 Storm Drain Inlet Protection 42 Each 7,376.00 175.62 208-00205 Erosion Control Supervisor 64 Hour 2,696.00 42.13 210-00750 Reset Light Standard 10 Each 5,500.00 550.00 210-00810 Reset Ground Sign 1 Each 500.00 500.00 210-00815 Reset Sign Panel 404 Each 6,660.00 16.49 210-01130 Reset Guardrail Type 3 1,500 Lin Foot 37,500.00 25.00 210-01140 Reset Guardrail Type 4 1,590 Lin Foot 17,490.00 11.00 212-00006 Seeding (Native) 2 Acre 1,000.00 500.00 212-00047 Soil Preparation (Special) 2 Acre 1,420.00 710.00 213-00003 Mulching (Weed Free) 2 Acre 1,310.00 655.00 213-00061 Mulch Tackifier 600 Pound 1,080.00 1.80 304-01005 Aggregate Base Course (Class 1) 104 Cubic Yard 6,032.00 58.00 304-06000 Aggregate Base Course (Class 6) 10 Ton 250.00 25.00 Colorado Department of Transporation 16:10 Tuesday, January 25, 2005 2 2004 Cost Data - Maintenance INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/04 THROUGH 12/31/04 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 403-00720 Hot Bituminous Pavement (Patching) (Asphalt) 210 Ton 20,100.00 95.71 403-00721 Hot Bituminous Pavement (Patching) (Asphalt) 60 Sq Yard 3,720.00 62.00 403-09111 Stone Mastic Asphalt 269,563 Sq Yard 830,254.04 3.08 403-33741 Hot Bituminous Pavement (Grading S) (75) (PG 64-22) 20 Ton 2,740.00 137.00 403-34841 Hot Bituminous Pavement (Grading SX) (100) (PG 64-22) 7,663 Ton 278,933.20 36.40 403-34871 Hot Bituminous Pavement (Grading SX) (100) (PG 76-28) 15,987 Ton 539,236.50 33.73 409-02010 Cover Coat Material (Type II) 3,067 Ton 141,082.00 46.00 411-10253 Emulsified Asphalt (CSS-1H) 5,573 Gallon 5,573.00 1.00 411-10255 Emulsified Asphalt (Slow-Setting) 20,173 Gallon 26,850.40 1.33 411-10275 Emulsified Asphalt (HFMS-2P) (High Float) (Polymerize 121,579 Gallon 158,052.70 1.30 412-04000 Concrete Pavement Panel (Precast) 48,216 Sq Foot 1,060,752.00 22.00 503-00048 Drilled Caisson (48 Inch) 33 Lin Foot 9,306.00 282.00 509-90000 Paint Existing Structure(S) 1 Lump Sum 44,132.00 44,132.00 515-00120 Waterproofing (Membrane) 296 Sq Yard 3,996.00 13.50 518-01002 Bridge Expansion Device (0-2 Inch) 660 Lin Foot 57,420.00 87.00 518-01004 Bridge Expansion Device (0-4 Inch) 1,012 Lin Foot 150,453.30 148.67 518-01109 Bridge Expansion Device (Greater Than 4 In)(Install O 34 Lin Foot 14,280.00 420.00 518-02100 Polymer Mortar End Dam 639 Cubic Foot 257,094.80 402.34 518-03100 Rapid Cure Silicone Joint Seal 1,341 Lin Foot 32,011.50 23.87 601-03040 Concrete Class D (Bridge) 10 Cubic Yard 9,134.00 913.40 601-03041 Concrete Class D (Bridge) (Special) 9 Cubic Yard 6,486.00 720.67 601-04000 Concrete Class E 68 Cubic Yard 42,500.00 625.00 601-06100 Concrete (Patching) 74 Cubic Yard 111,000.00 1,500.00 601-06150 Concrete (Patching) 25 Sq Foot 2,150.00 86.00 601-10250 Slab Jacking 49,573 Pound 446,157.00 9.00 601-40300 Structural Concrete Coating 1,820 Sq Yard 17,017.00 9.35 601-40301 Structural Concrete Coating 100 Sq Foot 600.00 6.00 602-00020 Reinforcing Steel (Epoxy Coated) 24,916 Pound 42,628.60 1.71 606-00301 Guardrail Type 3 (6-3 Post Spacing) 1,525 Lin Foot 32,347.50 21.21 606-00705 Guardrail Type 7 (Special) 200 Lin Foot 36,000.00 180.00 606-01340 End Anchorage Type 3D 1 Each 2,625.00 2,625.00 606-01370 Transition Type 3G 31 Each 30,840.00 994.84 606-01380 Transition Type 3H 18 Each 11,500.00 638.89 606-01460 Median Terminal 14 Each 49,700.00 3,550.00 606-02001 End Anchorage (Slotted Rail Terminal) 16 Each 35,760.00 2,235.00 606-02005 End Anchorage (Flared) 16 Each 21,732.00 1,358.25 606-10405 Bridge Rail Type 4 (Special) 55 Lin Foot 9,900.00 180.00 606-10700 Bridge Rail Type 7 942 Lin Foot 89,490.00 95.00 Colorado Department of Transporation 16:10 Tuesday, January 25, 2005 3 2004 Cost Data - Maintenance INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/04 THROUGH 12/31/04 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 607-00010 Corner and Line Brace Post 446 Each 94,552.00 212.00 607-01010 Fence Barbed Wire with Metal Posts (Special) 102,732 Lin Foot 102,731.50 1.00 607-53137 Fence Chain Link (Special) (36 Inch) 320 Lin Foot 12,800.00 40.00 607-60620 Road Closure Gate 4 Each 23,280.00 5,820.00 612-00001 Delineator (Type I) 20 Each 140.00 7.00 612-00002 Delineator (Type II) 8 Each 408.00 51.00 612-00003 Delineator (Type III) 10 Each 80.00 8.00 613-00126 1-1/4 Inch Electrical Conduit (Jacked) 300 Lin Foot 3,750.00 12.50 613-00150 1-1/2 Inch Electrical Conduit 60 Lin Foot 1,500.00 25.00 613-00200 2 Inch Electrical Conduit 5,669 Lin Foot 56,655.75 9.99 613-00201 2 Inch Electrical Conduit (Jacked) 3,200 Lin Foot 38,372.00 11.99 613-00300 3 Inch Electrical Conduit 550 Lin Foot 11,210.00 20.38 613-00301 3 Inch Electrical Conduit (Jacked) 1,520 Lin Foot 17,732.80 11.67 613-00700 Inspection Trip 24 Each 18,000.00 750.00 613-01125 1-1/4 Inch Electrical Conduit (Plastic) 300 Lin Foot 1,800.00 6.00 613-01200 2 Inch Electrical Conduit (Plastic) 23,718 Lin Foot 146,587.52 6.18 613-01300 3 Inch Electrical Conduit (Plastic) 11,792 Lin Foot 82,775.40 7.02 613-05000 Direct-Burial Cable 1,000 Lin Foot 8,400.00 8.40 613-07000 Pull Box (Special) 135 Each 72,495.00 537.00 613-10000 Wiring 4 Lump Sum 37,099.00 9,274.75 613-32400 Light Standard Steel (40 Foot) 10 Each 38,000.00 3,800.00 613-34400 Light Standard Metal (40 Foot) 60 Each 40,500.00 675.00 613-40000 Concrete Foundation Pad 4 Each 2,400.00 600.00 613-40010 Light Standard Foundation 10 Each 10,050.00 1,005.00 613-40020 Transformer Base Aluminum 20 Each 17,400.00 870.00 613-40030 Transformer Base Aluminum (Install Only) 60 Each 3,000.00 50.00 613-50010 Photoelectric Cell 600 Each 46,500.00 77.50 613-50200 Lighting System 20 Each 5,500.00 275.00 613-60000 Lamps 650 Each 60,350.00 92.85 613-60500 Underground Repair 80 Each 28,000.00 350.00 613-70255 Fuses 250 Each 8,650.00 34.60 613-70260 Fuse Holder 170 Each 9,100.00 53.53 613-70400 Luminaire High Pressure Sodium (400 Watt) 450 Each 186,000.00 413.33 613-72150 Luminaire High Pressure Sodium (Wall Type) (150 Watt) 25 Each 10,750.00 430.00 613-80010 Ballast Unit 175 Each 35,750.00 204.29 614-00011 Sign Panel (Class I) 8,403 Sq Foot 66,162.50 7.87 614-00012 Sign Panel (Class II) 9,897 Sq Foot 113,328.50 11.45 614-00013 Sign Panel (Class III) 19,043 Sq Foot 309,561.00 16.26 Colorado Department of Transporation 16:10 Tuesday, January 25, 2005 4 2004 Cost Data - Maintenance INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/04 THROUGH 12/31/04 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 614-00025 Sign Panel (Class I) (Install Only) 12,842 Sq Foot 26,968.20 2.10 614-00027 Sign Panel (Class II) (Install Only) 8,046 Sq Foot 20,919.60 2.60 614-00028 Sign Panel (Class III) (Install Only) 1,843 Sq Foot 5,529.00 3.00 614-00200 Steel Sign Post (U-2) 12 Lin Foot 134.67 11.22 614-00357 Steel Sign Post (S 3x5.7) 15 Lin Foot 450.00 30.00 614-00612 Steel Sign Post (W 6x12) 32 Lin Foot 896.00 28.00 614-00615 Steel Sign Post (W 6x15) 59 Lin Foot 1,888.00 32.00 614-00818 Steel Sign Post (W 8x18) 67 Lin Foot 2,278.00 34.00 614-00821 Steel Sign Post (W 8x21) 40 Lin Foot 1,520.00 38.00 614-01022 Steel Sign Post (W 10x22) 76 Lin Foot 3,040.00 40.00 614-01026 Steel Sign Post (W 10x26) 34 Lin Foot 1,496.00 44.00 614-01502 Steel Sign Support (2-Inch Round)(Post & Socket) 8,133 Lin Foot 65,714.00 8.08 614-01512 Steel Sign Support (2-Inch Round)(Post) 7,103 Lin Foot 40,153.00 5.65 614-01522 Steel Sign Support (2-Inch Round)(Socket) 687 Each 20,538.00 29.90 614-01552 Steel Sign Post (2.5 Inch Round) (Slipbase) 6,890 Lin Foot 158,470.00 23.00 614-01582 Steel Sign Support (2-1/2 Inch Round)(Post and Slipba 5,761 Lin Foot 124,742.00 21.65 614-01585 Steel Sign Support (2-1/2 Inch Round)(Post) 11,818 Lin Foot 146,764.00 12.42 614-01588 Steel Sign Support (2-1/2 Inch Round)(Slipbase) 939 Each 75,120.00 80.00 614-03001 Concrete Footing (Type 1) 2 Each 1,250.00 625.00 614-03002 Concrete Footing (Type 2) 4 Each 3,800.00 950.00 614-03003 Concrete Footing (Type 3) 4 Each 4,000.00 1,000.00 614-03004 Concrete Footing (Type 4) 2 Each 2,000.00 1,000.00 614-03005 Concrete Footing (Type 5) 4 Each 4,400.00 1,100.00 614-03006 Concrete Footing (Type 6) 2 Each 2,600.00 1,300.00 614-10050 Modification of Overhead Sign Structure 3 Each 4,500.00 1,500.00 614-10120 Variable Message Sign 1 Each 123,547.00 123,547.00 614-32400 Monotube Overhead Sign Cantilever (24 Inch Diameter) 1 Each 26,929.00 26,929.00 614-72855 Traffic Signal Controller Cabinet 23 Each 276,000.00 12,000.00 614-72872 Loop Detector (Micro Type) 13 Each 5,460.00 420.00 614-72875 Loop Detector Wire 6,660 Lin Foot 17,316.00 2.60 614-72876 Traffic Signal Vehicle Detector Amplifier (Loop Type) 36 Each 5,760.00 160.00 614-72886 Intersection Detection System (Camera) 2 Each 10,340.00 5,170.00 614-72889 Traffic Signal Vehicle Detector (Micro Type) (Non-Inv 26 Each 17,174.00 660.54 614-85001 Impact Attenuator 4 Each 60,500.00 15,125.00 614-85040 Impact Attenuator (Truck Mounted Attenuator) 2 Each 4,500.00 2,250.00 614-87413 Fiber Optic Cable (Multi Mode) (12 Strands) 24,000 Lin Foot 46,800.00 1.95 620-00012 Field Laboratory (Class 2) 1 Each 3,300.00 3,300.00 620-00020 Sanitary Facility 2 Each 680.00 340.00 Colorado Department of Transporation 16:10 Tuesday, January 25, 2005 5 2004 Cost Data - Maintenance INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/04 THROUGH 12/31/04 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 625-00000 Construction Surveying 2 Lump Sum 16,550.00 8,275.00 626-00000 Mobilization 22 Lump Sum 315,432.00 14,337.82 627-00001 Pavement Marking Paint 3 Gallon 1,605.00 535.00 627-00002 Thermoplastic Pavement Marking 100 Sq Foot 1,610.00 16.10 627-00003 Thermoplastic Pavement Marking (Inlaid) 4,500 Sq Foot 45,000.00 10.00 627-00004 Epoxy Pavement Marking 504,407 Sq Foot 350,964.55 0.70 627-00005 Epoxy Pavement Marking 187,342 Gallon 5,907,142.29 31.53 627-00012 Pavement Marking Paint (Low VOC Solvent Base) 610 Gallon 26,737.50 43.83 627-01000 Preformed Plastic Pavement Marking (Type A) 18,021 Sq Foot 154,498.60 8.57 627-01003 Preformed Plastic Pavement Marking (Type A) (Inlaid) 34,451 Sq Foot 288,108.00 8.36 627-03000 Preformed Plastic Pavement Marking (Type C) 10,000 Sq Foot 70,000.00 7.00 627-03003 Preformed Plastic Pavement Marking (Type C) (Inlaid) 47,967 Sq Foot 393,736.00 8.21 627-30210 Thermoplastic Pavement Marking (Xwalk-Stopline) 70,273 Sq Foot 175,682.50 2.50 627-30405 Preformed Thermoplastic Pavement Marking (Word-Symbol 26,305 Sq Foot 183,243.34 6.97 627-30410 Preformed Thermoplastic Pavement Marking (Xwalk-Stop 53,998 Sq Foot 295,235.70 5.47 630-00000 Flagging 4,960 Hour 110,268.20 22.23 630-00001 Pilot Car Operation 80 Hour 2,240.00 28.00 630-00003 Uniformed Traffic Control 648 Hour 18,456.00 28.48 630-00007 Traffic Control Inspection 87 Day 12,187.50 140.09 630-00009 Traffic Control Vehicle (Truck) 10 Each 43,916.00 4,391.60 630-00012 Traffic Control Management 973 Day 373,090.00 383.44 630-00025 Traffic Control Vehicle 100 Hour 1,200.00 12.00 630-10005 Traffic Control 7 Lump Sum 72,900.00 10,414.29 630-80001 Flashing Beacon (Portable) 4 Each 1,332.00 333.00 630-80305 Flagging Station Light 2 Each 7,700.00 3,850.00 630-80341 Construction Traffic Sign (Panel Size A) 61 Each 2,328.00 38.16 630-80342 Construction Traffic Sign (Panel Size B) 450 Each 32,717.00 72.70 630-80343 Construction Traffic Sign (Panel Size C) 104 Each 11,775.00 113.22 630-80344 Construction Traffic Sign (Special) 199 Sq Foot 5,145.60 25.86 630-80355 Portable Message Sign Panel 16 Each 93,280.00 5,830.00 630-80358 Advance Warning Flashing or Sequencing Arrow Panel (C 35 Each 36,470.00 1,042.00 630-80359 Portable Message Sign Panel 172 Day 25,515.00 148.34 630-80360 Drum Channelizing Device 605 Each 24,870.00 41.11 630-80364 Drum Channelizing Device (With Light) (Steady Burn) 150 Each 7,725.00 51.50 630-80370 Concrete Barrier (Temporary) 700 Lin Foot 11,200.00 16.00 630-80380 Traffic Cone 2,900 Each 22,557.50 7.78 630-80510 Mobile Pavement Marking Zone 4 Lump Sum 18,500.00 4,625.00 630-80520 Mobile Pavement Marking Zone 175 Day 56,620.00 323.54 Colorado Department of Transporation 16:10 Tuesday, January 25, 2005 6 2004 Cost Data - Maintenance INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/04 THROUGH 12/31/04 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 630-85010 Impact Attenuator (Temporary) 2 Each 9,600.00 4,800.00 630-85040 Impact Attenuator (Truck Mounted Attenuator) (Tempora 10 Each 156,745.00 15,674.50 Part 3 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 1 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00170 Grinding And Texturing Conc Pvmt Sq Yard ================================================ MTCE 04-049 CONCRETE SLABS ON I-25 03/18/04 5,360.00 10.00 9.96 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,360.00 10.00 9.96 9.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,360.00 10.00 9.96 9.00 =============== 202-00220 Rem Asphalt Mat Sq Yard ================================================ MTCE 06-041 SH 6 AT W. 19TH STREET 03/18/04 120.00 15.00 11.27 11.77 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 120.00 15.00 11.27 11.77 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 120.00 15.00 11.27 11.77 =============== 202-00240 Rem Asphalt Mat (Planing) Sq Yard ================================================ MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 135,767.00 1.00 0.97 0.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 135,767.00 1.00 0.97 0.95 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 135,767.00 1.00 0.97 0.95 =============== 202-00250 Rem Pavement Marking Sq Foot ================================================ MTCE 01-032 R-1 STENCIL MARKING 01/08/04 10,000.00 2.10 0.80 0.50 MTCE 01-035 R-1 STRIPING 01/08/04 10,000.00 1.20 0.40 0.35 MTCE 01-033 FAIRPLAY - MORRISON, EPOXY 01/08/04 231,000.00 0.58 0.61 0.38 MTCE 02-015 REGION 2 STRIPING 02/05/04 1,000.00 0.80 1.00 1.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 252,000.00 0.67 0.61 0.39 MTCE 01-034 REGION 1 FY 05 STRIPING 04/22/04 1,063,205.00 0.35 0.31 0.20 MTCE 02-018 REGION 2 STRIPING 06/03/04 10,000.00 0.80 0.63 1.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,073,205.00 0.35 0.31 0.21 MTCE 04-048 FY 05 R 4 QUALITY EPOXY PAVEM 08/05/04 273,407.00 0.60 0.48 0.38 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 2 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00250 Rem Pavement Marking Sq Foot ================================================ MTCE 04-055 R-4 EPOXY EAST 08/05/04 1,070,344.00 0.60 0.32 0.25 MTCE 04-054 R-4 EPOXY WEST 08/05/04 822,305.00 0.60 0.31 0.20 MTCE 06-049 VARIOUS R-6 STRIPING 08/12/04 100,000.00 0.50 0.31 0.35 MTCE 06-043R R-6, BRIDGE RAIL REPLACEMENT 08/26/04 5,000.00 1.00 1.75 1.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,271,056.00 0.60 0.34 0.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,596,261.00 0.53 0.35 0.25 =============== 202-00425 Rem Bridge Railing Lin Foot =============================================== MTCE 06-042 R6 - EXPANSION JOINT REPAIR 07/29/04 55.00 25.00 35.00 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 55.00 25.00 35.00 30.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 55.00 25.00 35.00 30.00 =============== 202-00503 Rem Port Present Str Sq Yard ================================================ MTCE 06-043R R-6, BRIDGE RAIL REPLACEMENT 08/26/04 316.00 200.00 205.00 160.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 316.00 200.00 205.00 160.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 316.00 200.00 205.00 160.00 =============== 202-00504 Rem Exp Device Lin Foot =============================================== MTCE 03-015 R3 EXPANSION JOINT REPAIR 02/12/04 77.30 150.00 235.50 133.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 77.30 150.00 235.50 133.00 MTCE 01-039 I70, EAST OF DENVER 04/01/04 660.00 80.00 27.34 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 660.00 80.00 27.34 10.00 MTCE 06-042 R6 - EXPANSION JOINT REPAIR 07/29/04 970.00 100.00 72.50 50.00 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 3 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00504 Rem Exp Device Lin Foot =============================================== MTCE 03-017 R-3, EXPANSION JOINT REPAIRS 08/19/04 1,298.00 70.00 61.53 64.60 MTCE 03-020R R3 EXPANSION JOINT REPAIRS ON 09/16/04 34.00 475.00 555.00 555.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,302.00 88.62 68.02 65.69 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,039.30 88.31 61.71 55.31 =============== 202-00700 Rem Light Standard Each =================================================== MTCE 01-041 REGION 1 HIGHWAY LIGHTING 07/29/04 2.00 400.00 526.67 450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 400.00 526.67 450.00 MTCE 01-038 I-70 & SH 91 VMS/ SNOW GATES 10/28/04 1.00 500.00 601.12 648.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 500.00 601.12 648.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 433.33 569.21 516.00 =============== 202-00810 Rem Ground Sign Each =================================================== MTCE 01-037 R-1 SIGNING 01/15/04 521.00 40.00 37.35 25.00 MTCE 06-039 R-6, SIGN POST REPLACEMENT 01/29/04 400.00 20.00 27.29 10.00 MTCE 04-047 R-4 SIGNS SH 14 CENTRAL 03/11/04 206.00 10.00 22.40 12.00 MTCE 06-041 SH 6 AT W. 19TH STREET 03/18/04 1.00 45.00 45.25 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,128.00 27.43 30.19 17.35 MTCE 03-018 R-3 SIGN REPLACEMENT 07/29/04 1,203.00 10.00 18.67 11.00 MTCE 04-053 R-4 SIGNS, SH 14 WEST 08/12/04 396.00 12.00 40.67 25.00 MTCE 01-043 I-70, LIMON TO KANSAS STATELI 08/19/04 515.00 15.00 56.67 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,114.00 11.59 27.19 20.69 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,242.00 17.10 28.26 19.53 =============== 202-00821 Rem Sign Panel Each =================================================== MTCE 01-037 R-1 SIGNING 01/15/04 226.00 80.00 48.45 35.00 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 4 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00821 Rem Sign Panel Each =================================================== MTCE 04-047 R-4 SIGNS SH 14 CENTRAL 03/11/04 157.00 7.00 18.60 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 383.00 50.08 34.58 23.93 MTCE 03-018 R-3 SIGN REPLACEMENT 07/29/04 2,091.00 6.00 12.17 8.00 MTCE 04-053 R-4 SIGNS, SH 14 WEST 08/12/04 333.00 12.00 27.67 20.00 MTCE 01-043 I-70, LIMON TO KANSAS STATELI 08/19/04 123.00 10.00 90.00 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,547.00 6.98 15.34 12.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,930.00 12.61 17.43 14.26 =============== 202-00825 Rem Flashing Beacon Each =================================================== MTCE 04-047 R-4 SIGNS SH 14 CENTRAL 03/11/04 3.00 300.00 325.00 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 300.00 325.00 125.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 300.00 325.00 125.00 =============== 202-00855 Rem Traf Sig Control Cab Each =================================================== MTCE 01-036 R-1 CONTROLLER CABINETS 06/24/04 23.00 300.00 677.55 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 23.00 300.00 677.55 300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 23.00 300.00 677.55 300.00 =============== 202-00895 Rem of Impact Attenuator Each =================================================== MTCE 06-052 INTERSTATE 25 SB AT EXIT 213 10/14/04 1.00 750.00 1849.50 2750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 750.00 1849.50 2750.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 750.00 1849.50 2750.00 =============== 202-01000 Rem Fence Lin Foot =============================================== MTCE 05-032 R5 - FENCING 04/22/04 102,731.50 0.35 0.45 0.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 102,731.50 0.35 0.45 0.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 102,731.50 0.35 0.45 0.50 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 5 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01030 Rem of Road Closure Gate Each =================================================== MTCE 01-038 I-70 & SH 91 VMS/ SNOW GATES 10/28/04 3.00 500.00 419.08 188.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 500.00 419.08 188.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 500.00 419.08 188.00 =============== 202-01130 Rem Gdrail Ty 3 Lin Foot =============================================== MTCE 06-043R R-6, BRIDGE RAIL REPLACEMENT 08/26/04 246.00 2.50 4.25 4.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 246.00 2.50 4.25 4.50 MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 850.00 3.00 5.11 5.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 850.00 3.00 5.11 5.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,096.00 2.89 5.03 5.20 =============== 202-01140 Rem Gdrail Ty 4 Lin Foot =============================================== MTCE 03-017 R-3, EXPANSION JOINT REPAIRS 08/19/04 6.00 10.00 200.00 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 10.00 200.00 150.00 MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 200.00 15.00 30.55 27.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 200.00 15.00 30.55 27.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 206.00 14.85 33.05 31.07 =============== 202-01300 Rem End Anchorage Each =================================================== MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 70.00 100.00 186.93 165.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 70.00 100.00 186.93 165.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 70.00 100.00 186.93 165.00 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 6 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-04002 Clean Culvert Each =================================================== MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 4.00 600.00 693.33 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 600.00 693.33 150.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 600.00 693.33 150.00 =============== 202-05026 Sawing Asphalt Mat (6 In) Lin Foot =============================================== MTCE 06-041 SH 6 AT W. 19TH STREET 03/18/04 600.00 2.50 2.34 5.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 600.00 2.50 2.34 5.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 600.00 2.50 2.34 5.40 =============== 203-00010 Uncl Excav (CIP) Cubic Yard ============================================= MTCE 06-041 SH 6 AT W. 19TH STREET 03/18/04 180.00 15.00 34.61 16.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 180.00 15.00 34.61 16.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 180.00 15.00 34.61 16.10 =============== 203-00060 Emb Matl (CIP) Cubic Yard ============================================= MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 1,731.00 12.00 15.96 7.00 MTCE 01-038 I-70 & SH 91 VMS/ SNOW GATES 10/28/04 10.00 50.00 131.78 147.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,741.00 12.22 16.84 7.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,741.00 12.22 16.84 7.80 =============== 203-01500 Blading Hour =================================================== MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 20.00 120.00 112.83 133.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 20.00 120.00 112.83 133.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 120.00 112.83 133.00 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 7 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01597 Potholing Hour =================================================== MTCE 01-038 I-70 & SH 91 VMS/ SNOW GATES 10/28/04 10.00 150.00 150.79 112.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 150.00 150.79 112.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 150.00 150.79 112.00 =============== 208-00045 Conc Washout Str Each =================================================== MTCE 03-015 R3 EXPANSION JOINT REPAIR 02/12/04 1.00 800.00 1418.75 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 800.00 1418.75 150.00 MTCE 06-042 R6 - EXPANSION JOINT REPAIR 07/29/04 2.00 600.00 775.00 1000.00 MTCE 03-017 R-3, EXPANSION JOINT REPAIRS 08/19/04 6.00 700.00 313.33 110.00 MTCE 06-043R R-6, BRIDGE RAIL REPLACEMENT 08/26/04 2.00 600.00 750.00 500.00 MTCE 03-020R R3 EXPANSION JOINT REPAIRS ON 09/16/04 1.00 490.00 175.00 175.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 11.00 644.55 441.30 348.64 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 657.50 567.42 332.08 =============== 208-00050 Storm Drain Inlet Protection Each =================================================== MTCE 03-015 R3 EXPANSION JOINT REPAIR 02/12/04 1.00 500.00 1309.25 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 500.00 1309.25 75.00 MTCE 06-042 R6 - EXPANSION JOINT REPAIR 07/29/04 4.00 200.00 325.00 400.00 MTCE 06-046 I-70 & C-470 ALTERNATE PAVEME 08/19/04 20.00 200.00 186.25 90.00 MTCE 03-017 R-3, EXPANSION JOINT REPAIRS 08/19/04 12.00 250.00 218.33 75.00 MTCE 06-043R R-6, BRIDGE RAIL REPLACEMENT 08/26/04 4.00 200.00 305.00 210.00 MTCE 03-020R R3 EXPANSION JOINT REPAIRS ON 09/16/04 1.00 220.00 111.00 111.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 41.00 215.12 220.01 140.35 MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 10.00 250.00 210.51 295.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 250.00 210.51 295.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 52.00 227.31 244.13 175.62 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 8 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00205 Erosion Control Supervisor Hour =================================================== MTCE 03-015 R3 EXPANSION JOINT REPAIR 02/12/04 16.00 60.00 67.06 31.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16.00 60.00 67.06 31.00 MTCE 06-042 R6 - EXPANSION JOINT REPAIR 07/29/04 8.00 50.00 50.00 50.00 MTCE 06-046 I-70 & C-470 ALTERNATE PAVEME 08/19/04 32.00 55.00 76.25 40.00 MTCE 06-043R R-6, BRIDGE RAIL REPLACEMENT 08/26/04 8.00 50.00 57.50 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 48.00 53.33 68.75 48.75 MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 16.00 55.00 221.33 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 16.00 55.00 221.33 40.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 80.00 55.00 125.55 42.13 =============== 210-00750 Res Light Standard Each =================================================== MTCE 01-041 REGION 1 HIGHWAY LIGHTING 07/29/04 10.00 800.00 976.00 550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 800.00 976.00 550.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 800.00 976.00 550.00 =============== 210-00810 Res Ground Sign Each =================================================== MTCE 01-037 R-1 SIGNING 01/15/04 1.00 100.00 359.45 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 100.00 359.45 500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 100.00 359.45 500.00 =============== 210-00815 Res Sign Panel Each =================================================== MTCE 01-037 R-1 SIGNING 01/15/04 3.00 300.00 224.05 150.00 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 9 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00815 Res Sign Panel Each =================================================== MTCE 06-039 R-6, SIGN POST REPLACEMENT 01/29/04 400.00 25.00 28.38 15.00 MTCE 06-041 SH 6 AT W. 19TH STREET 03/18/04 1.00 100.00 127.25 210.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 404.00 27.23 29.51 16.49 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 404.00 27.23 29.51 16.49 =============== 210-01130 Res Gdrail Ty 3 Lin Foot =============================================== MTCE 03-019R HWYS 70, 82, 50, 133, 141, 92 09/16/04 1,500.00 18.00 15.45 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,500.00 18.00 15.45 25.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,500.00 18.00 15.45 25.00 =============== 210-01140 Res Gdrail Ty 4 Lin Foot =============================================== MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 1,590.00 5.00 11.76 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,590.00 5.00 11.76 11.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,590.00 5.00 11.76 11.00 =============== 212-00006 Seeding (Native) Acre =================================================== MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 2.00 700.00 494.05 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 700.00 494.05 500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 700.00 494.05 500.00 =============== 212-00047 Soil Preparation (Spec) Acre =================================================== MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 2.00 700.00 766.46 710.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 700.00 766.46 710.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 700.00 766.46 710.00 =============== 213-00003 Mulching (Weed Free) Acre =================================================== MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 2.00 600.00 621.68 655.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 600.00 621.68 655.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 600.00 621.68 655.00 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 10 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00061 Mulch Tackifier Pound ================================================== MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 600.00 2.50 1.81 1.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 600.00 2.50 1.81 1.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 600.00 2.50 1.81 1.80 =============== 304-01005 ABC (CL 1) Cubic Yard ============================================= MTCE 06-041 SH 6 AT W. 19TH STREET 03/18/04 104.00 35.00 47.70 58.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 104.00 35.00 47.70 58.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 104.00 35.00 47.70 58.00 =============== 304-06000 ABC (CL 6) Ton ==================================================== MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 10.00 50.00 41.43 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 50.00 41.43 25.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 50.00 41.43 25.00 =============== 403-00720 HBP (Patching) (Asph) Ton ==================================================== MTCE 06-046 I-70 & C-470 ALTERNATE PAVEME 08/19/04 200.00 80.00 116.25 90.00 MTCE 03-017 R-3, EXPANSION JOINT REPAIRS 08/19/04 10.00 100.00 341.67 385.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 210.00 80.95 131.98 116.82 MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 100.00 100.00 87.24 72.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 100.00 100.00 87.24 72.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 310.00 87.10 105.92 95.71 =============== 403-00721 HBP (Patching) (Asph) Sq Yard ================================================ MTCE 01-038 I-70 & SH 91 VMS/ SNOW GATES 10/28/04 60.00 70.00 68.32 62.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 60.00 70.00 68.32 62.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 60.00 70.00 68.32 62.00 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 11 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-09111 SMA Sq Yard ================================================ MTCE 06-046 I-70 & C-470 ALTERNATE PAVEME 08/19/04 269,563.00 4.00 3.31 3.08 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 269,563.00 4.00 3.31 3.08 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 269,563.00 4.00 3.31 3.08 =============== 403-33741 HBP (Gr S) (75) (PG 64-22) Ton ==================================================== MTCE 06-041 SH 6 AT W. 19TH STREET 03/18/04 20.00 85.00 148.35 137.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 85.00 148.35 137.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 85.00 148.35 137.00 =============== 403-34841 HBP (Gr SX) (100) (PG 64-22) Ton ==================================================== MTCE 01-040 I-25, NEAR LARKSPUR 07/29/04 7,663.00 45.00 39.47 36.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7,663.00 45.00 39.47 36.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,663.00 45.00 39.47 36.40 =============== 403-34871 HBP (Gr SX) (100) (PG 76-28) Ton ==================================================== MTCE 06-043R R-6, BRIDGE RAIL REPLACEMENT 08/26/04 48.00 100.00 125.00 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 48.00 100.00 125.00 110.00 MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 15,939.00 40.00 38.05 33.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 15,939.00 40.00 38.05 33.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15,987.00 40.18 38.14 33.73 =============== 409-02010 CC Matl (Ty II) Ton ==================================================== MTCE 05-034R US 550, SOUTH OF DURANGO 09/02/04 3,067.00 35.00 42.88 46.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,067.00 35.00 42.88 46.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,067.00 35.00 42.88 46.00 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 12 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 409-05000 Ultrath Bond Wearing Course Sq Yard ================================================ MTCE 06-046 I-70 & C-470 ALTERNATE PAVEME . 269,563.00 4.00 3.40 . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 269,563.00 4.00 3.40 . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 269,563.00 4.00 3.40 . =============== 411-10253 Emul Asph (CSS-1H) Gallon ================================================= MTCE 01-040 I-25, NEAR LARKSPUR 07/29/04 5,573.00 1.40 1.05 1.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5,573.00 1.40 1.05 1.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,573.00 1.40 1.05 1.00 =============== 411-10255 Emul Asph (SS) Gallon ================================================= MTCE 06-041 SH 6 AT W. 19TH STREET 03/18/04 8.00 8.00 2.63 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 8.00 2.63 2.00 MTCE 06-046 I-70 & C-470 ALTERNATE PAVEME 08/19/04 26,756.00 1.00 1.43 1.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 26,756.00 1.00 1.43 1.60 MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 6,787.00 1.00 0.96 0.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6,787.00 1.00 0.96 0.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 33,551.00 1.00 1.22 1.33 =============== 411-10275 Emul Asph (HFMS-2P) Gallon ================================================= MTCE 05-034R US 550, SOUTH OF DURANGO 09/02/04 121,579.00 1.50 1.85 1.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 121,579.00 1.50 1.85 1.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 121,579.00 1.50 1.85 1.30 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 13 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 412-04000 Conc Pvt Pan (Precast) Sq Foot ================================================ MTCE 04-049 CONCRETE SLABS ON I-25 03/18/04 48,216.00 19.00 24.42 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 48,216.00 19.00 24.42 22.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 48,216.00 19.00 24.42 22.00 =============== 503-00048 Drilled Caisson (48 In) Lin Foot =============================================== MTCE 01-038 I-70 & SH 91 VMS/ SNOW GATES 10/28/04 33.00 500.00 335.84 282.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 33.00 500.00 335.84 282.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 33.00 500.00 335.84 282.00 =============== 509-90000 Paint Existing Str(S) LUMP SUM =============================================== MTCE 06-040 VARIOUS LOCATIONS IN REGION 6 01/08/04 1.00 66000.00 58387.79 44132.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 66000.00 58387.79 44132.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 66000.00 58387.79 44132.00 =============== 515-00120 Waterproofing (Membrane) Sq Yard ================================================ MTCE 06-043R R-6, BRIDGE RAIL REPLACEMENT 08/26/04 296.00 10.00 12.75 13.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 296.00 10.00 12.75 13.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 296.00 10.00 12.75 13.50 =============== 518-01002 Br Expan Device (0-2 In) Lin Foot =============================================== MTCE 01-039 I70, EAST OF DENVER 04/01/04 660.00 100.00 99.25 87.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 660.00 100.00 99.25 87.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 660.00 100.00 99.25 87.00 =============== 518-01004 Br Expan Device (0-4 In) Lin Foot =============================================== MTCE 03-015 R3 EXPANSION JOINT REPAIR 02/12/04 41.80 130.00 341.06 118.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 41.80 130.00 341.06 118.50 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 14 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 518-01004 Br Expan Device (0-4 In) Lin Foot =============================================== MTCE 06-042 R6 - EXPANSION JOINT REPAIR 07/29/04 970.00 125.00 135.00 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 970.00 125.00 135.00 150.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,011.80 125.21 151.35 148.70 =============== 518-01109 Inst Br Expan Device (Greater Than 4 In) Lin Foot =============================================== MTCE 03-020R R3 EXPANSION JOINT REPAIRS ON 09/16/04 34.00 660.00 420.00 420.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 34.00 660.00 420.00 420.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 34.00 660.00 420.00 420.00 =============== 518-02100 Polymer Mortar End Dam Cubic Foot ============================================= MTCE 03-015 R3 EXPANSION JOINT REPAIR 02/12/04 59.40 500.00 484.96 442.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 59.40 500.00 484.96 442.00 MTCE 03-017 R-3, EXPANSION JOINT REPAIRS 08/19/04 580.00 315.00 382.67 398.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 580.00 315.00 382.67 398.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 639.40 332.19 394.96 402.09 =============== 518-03100 Rapid Cure Silicone Jt Seal Lin Foot =============================================== MTCE 03-015 R3 EXPANSION JOINT REPAIR 02/12/04 36.30 50.00 148.88 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 36.30 50.00 148.88 55.00 MTCE 03-017 R-3, EXPANSION JOINT REPAIRS 08/19/04 1,305.00 55.00 62.67 23.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,305.00 55.00 62.67 23.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,341.30 54.86 65.75 23.87 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 15 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-03040 Conc CL D (Bridge) Cubic Yard ============================================= MTCE 03-017 R-3, EXPANSION JOINT REPAIRS 08/19/04 1.00 600.00 1861.33 1484.00 MTCE 03-020R R3 EXPANSION JOINT REPAIRS ON 09/16/04 9.00 925.00 850.00 850.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 892.50 1102.83 913.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 892.50 1102.83 913.40 =============== 601-03041 Conc CL D (Bridge) (Spec) Cubic Yard ============================================= MTCE 03-015 R3 EXPANSION JOINT REPAIR 02/12/04 9.20 600.00 2357.00 705.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9.20 600.00 2357.00 705.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.20 600.00 2357.00 705.00 =============== 601-04000 Conc CL E Cubic Yard ============================================= MTCE 06-043R R-6, BRIDGE RAIL REPLACEMENT 08/26/04 68.00 850.00 1137.50 625.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 68.00 850.00 1137.50 625.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 68.00 850.00 1137.50 625.00 =============== 601-06100 Conc (Patching) Cubic Yard ============================================= MTCE 06-042 R6 - EXPANSION JOINT REPAIR 07/29/04 74.00 1200.00 1625.00 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 74.00 1200.00 1625.00 1500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 74.00 1200.00 1625.00 1500.00 =============== 601-06150 Conc (Patching) Sq Foot ================================================ MTCE 06-043R R-6, BRIDGE RAIL REPLACEMENT 08/26/04 25.00 35.00 63.00 86.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 25.00 35.00 63.00 86.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25.00 35.00 63.00 86.00 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 16 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-10250 Slab Jacking Pound ================================================== MTCE 04-049 CONCRETE SLABS ON I-25 03/18/04 49,573.00 6.00 8.86 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 49,573.00 6.00 8.86 9.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 49,573.00 6.00 8.86 9.00 =============== 601-40300 Struct Conc Coating Sq Yard ================================================ MTCE 06-043R R-6, BRIDGE RAIL REPLACEMENT 08/26/04 1,820.00 4.00 9.68 9.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,820.00 4.00 9.68 9.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,820.00 4.00 9.68 9.35 =============== 601-40301 Struct Conc Coating Sq Foot ================================================ MTCE 06-042 R6 - EXPANSION JOINT REPAIR 07/29/04 100.00 1.50 5.50 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 100.00 1.50 5.50 6.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 100.00 1.50 5.50 6.00 =============== 602-00020 Reinf Steel (Epoxy) Pound ================================================== MTCE 03-015 R3 EXPANSION JOINT REPAIR 02/12/04 147.40 1.50 3.86 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 147.40 1.50 3.86 2.00 MTCE 06-042 R6 - EXPANSION JOINT REPAIR 07/29/04 7,000.00 1.00 2.63 2.50 MTCE 03-017 R-3, EXPANSION JOINT REPAIRS 08/19/04 21.00 3.00 5.43 4.30 MTCE 06-043R R-6, BRIDGE RAIL REPLACEMENT 08/26/04 16,238.00 1.00 1.05 1.25 MTCE 03-020R R3 EXPANSION JOINT REPAIRS ON 09/16/04 510.00 4.00 4.60 4.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 23,769.00 1.07 1.56 1.69 MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 1,000.00 2.00 2.03 2.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,000.00 2.00 2.03 2.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 24,916.40 1.11 1.64 1.71 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 17 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-00301 Gdrail Ty 3 (6-3) Lin Foot =============================================== MTCE 03-019R HWYS 70, 82, 50, 133, 141, 92 09/16/04 600.00 33.00 30.86 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 600.00 33.00 30.86 25.00 MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 850.00 12.00 20.29 18.00 MTCE 01-038 I-70 & SH 91 VMS/ SNOW GATES 10/28/04 75.00 30.00 25.19 27.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 925.00 13.46 20.81 18.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,525.00 21.15 22.55 21.21 =============== 606-00705 Gdrail Ty 7 (Spec) Lin Foot =============================================== MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 200.00 90.00 144.78 180.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 200.00 90.00 144.78 180.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 200.00 90.00 144.78 180.00 =============== 606-01340 End Anchor Ty 3D Each =================================================== MTCE 01-038 I-70 & SH 91 VMS/ SNOW GATES 10/28/04 1.00 600.00 1133.08 2625.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 600.00 1133.08 2625.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 600.00 1133.08 2625.00 =============== 606-01370 Transition Ty 3G Each =================================================== MTCE 06-043R R-6, BRIDGE RAIL REPLACEMENT 08/26/04 4.00 800.00 1165.00 1230.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 800.00 1165.00 1230.00 MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 27.00 750.00 1021.19 960.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 27.00 750.00 1021.19 960.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 31.00 756.45 1027.96 994.84 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 18 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-01380 Transition Ty 3H Each =================================================== MTCE 06-043R R-6, BRIDGE RAIL REPLACEMENT 08/26/04 4.00 500.00 737.50 775.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 500.00 737.50 775.00 MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 14.00 450.00 628.64 600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 14.00 450.00 628.64 600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18.00 461.11 638.11 638.89 =============== 606-01460 Median Terminal Each =================================================== MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 14.00 3400.00 3818.11 3550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 14.00 3400.00 3818.11 3550.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 3400.00 3818.11 3550.00 =============== 606-02001 End Anchor (SRT) Each =================================================== MTCE 03-019R HWYS 70, 82, 50, 133, 141, 92 09/16/04 16.00 2650.00 2636.30 2235.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 16.00 2650.00 2636.30 2235.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 2650.00 2636.30 2235.00 =============== 606-02005 End Anchor (Flared) Each =================================================== MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 15.00 1250.00 1471.89 1375.00 MTCE 01-038 I-70 & SH 91 VMS/ SNOW GATES 10/28/04 1.00 1500.00 2194.59 1107.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 16.00 1265.63 1530.89 1358.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 16.00 1265.63 1530.89 1358.25 =============== 606-10405 Brdg Rail Ty 4 (Spec) Lin Foot =============================================== MTCE 06-042 R6 - EXPANSION JOINT REPAIR 07/29/04 55.00 180.00 175.00 180.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 55.00 180.00 175.00 180.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 55.00 180.00 175.00 180.00 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 19 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-10700 Brdg Rail Ty 7 Lin Foot =============================================== MTCE 06-043R R-6, BRIDGE RAIL REPLACEMENT 08/26/04 942.00 100.00 97.50 95.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 942.00 100.00 97.50 95.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 942.00 100.00 97.50 95.00 =============== 607-00010 Corner and Line Br Post Each =================================================== MTCE 05-032 R5 - FENCING 04/22/04 446.00 110.00 173.27 212.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 446.00 110.00 173.27 212.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 446.00 110.00 173.27 212.00 =============== 607-01010 Fence BW MP (Spec) Lin Foot =============================================== MTCE 05-032 R5 - FENCING 04/22/04 102,731.50 1.50 1.51 1.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 102,731.50 1.50 1.51 1.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 102,731.50 1.50 1.51 1.00 =============== 607-53137 Fence CL (Spec) (36 In) Lin Foot =============================================== MTCE 06-043R R-6, BRIDGE RAIL REPLACEMENT 08/26/04 320.00 18.00 37.50 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 320.00 18.00 37.50 40.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 320.00 18.00 37.50 40.00 =============== 607-60620 Road Closure Gate Each =================================================== MTCE 01-038 I-70 & SH 91 VMS/ SNOW GATES 10/28/04 4.00 10000.00 10564.00 5820.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 10000.00 10564.00 5820.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 10000.00 10564.00 5820.00 =============== 612-00001 Delin (Ty I) Each =================================================== MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 20.00 17.00 18.16 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 20.00 17.00 18.16 7.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 17.00 18.16 7.00 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 20 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 612-00002 Delin (Ty II) Each =================================================== MTCE 06-041 SH 6 AT W. 19TH STREET 03/18/04 8.00 20.00 36.01 51.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 20.00 36.01 51.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8.00 20.00 36.01 51.00 =============== 612-00003 Delin (Ty III) Each =================================================== MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 10.00 19.00 20.18 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 19.00 20.18 8.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 19.00 20.18 8.00 =============== 613-00126 1-1/4 In Elec Cond (Jacked) Lin Foot =============================================== MTCE 01-041 REGION 1 HIGHWAY LIGHTING 07/29/04 300.00 12.00 14.63 12.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 300.00 12.00 14.63 12.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 300.00 12.00 14.63 12.50 =============== 613-00150 1-1/2 In Elec Cond Lin Foot =============================================== MTCE 01-036 R-1 CONTROLLER CABINETS 06/24/04 60.00 15.00 18.11 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 60.00 15.00 18.11 25.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 60.00 15.00 18.11 25.00 =============== 613-00200 2 In Elec Cond Lin Foot =============================================== MTCE 06-044 R-6 SIGNAL INTERSECTIONS 06/17/04 3,645.00 10.00 13.94 11.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 3,645.00 10.00 13.94 11.75 MTCE 06-042 R6 - EXPANSION JOINT REPAIR 07/29/04 110.00 10.00 29.50 30.00 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 21 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-00200 2 In Elec Cond Lin Foot =============================================== MTCE 06-043R R-6, BRIDGE RAIL REPLACEMENT 08/26/04 1,914.00 10.00 10.75 5.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,024.00 10.00 11.77 6.83 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,669.00 10.00 13.60 9.99 =============== 613-00201 2 In Elec Cond (Jacked) Lin Foot =============================================== MTCE 01-041 REGION 1 HIGHWAY LIGHTING 07/29/04 3,000.00 6.00 16.99 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,000.00 6.00 16.99 12.00 MTCE 01-038 I-70 & SH 91 VMS/ SNOW GATES 10/28/04 200.00 30.00 24.12 11.86 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 200.00 30.00 24.12 11.86 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,200.00 7.50 18.07 11.99 =============== 613-00300 3 In Elec Cond Lin Foot =============================================== MTCE 06-044 R-6 SIGNAL INTERSECTIONS 06/17/04 310.00 20.00 35.80 23.00 MTCE 01-036 R-1 CONTROLLER CABINETS 06/24/04 240.00 20.00 16.32 17.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 550.00 20.00 27.30 20.38 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 550.00 20.00 27.30 20.38 =============== 613-00301 3 In Elec Cond (Jacked) Lin Foot =============================================== MTCE 01-041 REGION 1 HIGHWAY LIGHTING 07/29/04 1,000.00 12.00 19.47 13.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,000.00 12.00 19.47 13.50 MTCE 01-038 I-70 & SH 91 VMS/ SNOW GATES 10/28/04 520.00 35.00 20.89 8.14 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 520.00 35.00 20.89 8.14 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,520.00 19.87 20.30 11.67 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 22 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-00700 Insp Trip Each =================================================== MTCE 02-017 REGION 2 STREET LIGHTING 06/03/04 24.00 1500.00 1249.95 750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 24.00 1500.00 1249.95 750.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 24.00 1500.00 1249.95 750.00 =============== 613-01125 1-1/4 In Elec Cond (P) Lin Foot =============================================== MTCE 01-041 REGION 1 HIGHWAY LIGHTING 07/29/04 300.00 8.00 7.93 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 300.00 8.00 7.93 6.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 300.00 8.00 7.93 6.00 =============== 613-01200 2 In Elec Cond (P) Lin Foot =============================================== MTCE 06-041 SH 6 AT W. 19TH STREET 03/18/04 800.00 9.00 8.92 7.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 800.00 9.00 8.92 7.50 MTCE 02-017 REGION 2 STREET LIGHTING 06/03/04 2,000.00 12.00 10.82 5.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2,000.00 12.00 10.82 5.00 MTCE 01-041 REGION 1 HIGHWAY LIGHTING 07/29/04 20,000.00 6.00 8.47 6.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20,000.00 6.00 8.47 6.50 MTCE 01-038 I-70 & SH 91 VMS/ SNOW GATES 10/28/04 918.00 15.00 8.41 0.64 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 918.00 15.00 8.41 0.64 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 23,718.00 6.96 8.87 6.18 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 23 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-01300 3 In Elec Cond (P) Lin Foot =============================================== MTCE 06-041 SH 6 AT W. 19TH STREET 03/18/04 50.00 15.00 35.00 39.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 50.00 15.00 35.00 39.50 MTCE 01-041 REGION 1 HIGHWAY LIGHTING 07/29/04 10,000.00 9.00 9.68 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10,000.00 9.00 9.68 7.00 MTCE 01-038 I-70 & SH 91 VMS/ SNOW GATES 10/28/04 1,742.00 18.00 11.15 6.20 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,742.00 18.00 11.15 6.20 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,792.00 10.35 10.26 7.02 =============== 613-05000 Dir Burial Cable Lin Foot =============================================== MTCE 01-041 REGION 1 HIGHWAY LIGHTING 07/29/04 1,000.00 4.00 7.13 8.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,000.00 4.00 7.13 8.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,000.00 4.00 7.13 8.40 =============== 613-07000 Pull Box (Spec) Each =================================================== MTCE 06-044 R-6 SIGNAL INTERSECTIONS 06/17/04 14.00 365.00 413.81 325.00 MTCE 01-036 R-1 CONTROLLER CABINETS 06/24/04 6.00 330.00 421.86 580.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20.00 354.50 416.22 401.50 MTCE 01-041 REGION 1 HIGHWAY LIGHTING 07/29/04 100.00 250.00 711.67 550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 100.00 250.00 711.67 550.00 MTCE 01-038 I-70 & SH 91 VMS/ SNOW GATES 10/28/04 15.00 300.00 617.55 631.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 15.00 300.00 617.55 631.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 135.00 271.04 625.10 537.00 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 24 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-10000 Wiring LUMP SUM =============================================== MTCE 06-041 SH 6 AT W. 19TH STREET 03/18/04 1.00 1490.00 1239.00 1065.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 1490.00 1239.00 1065.00 MTCE 06-044 R-6 SIGNAL INTERSECTIONS 06/17/04 1.00 6000.00 9625.12 10750.00 MTCE 01-036 R-1 CONTROLLER CABINETS 06/24/04 1.00 5000.00 18022.34 22032.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 5500.00 13823.73 16391.00 MTCE 01-038 I-70 & SH 91 VMS/ SNOW GATES 10/28/04 1.00 20000.00 6200.41 3252.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 20000.00 6200.41 3252.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 8122.50 9185.17 9274.75 =============== 613-32400 Light Std Steel (40 Ft) Each =================================================== MTCE 01-041 REGION 1 HIGHWAY LIGHTING 07/29/04 10.00 2500.00 2916.67 3800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 2500.00 2916.67 3800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 2500.00 2916.67 3800.00 =============== 613-34400 Light Std Metal (40 Ft) Each =================================================== MTCE 02-017 REGION 2 STREET LIGHTING 06/03/04 60.00 1200.00 817.79 675.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 60.00 1200.00 817.79 675.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 60.00 1200.00 817.79 675.00 =============== 613-40000 Conc Foundation Pad Each =================================================== MTCE 02-017 REGION 2 STREET LIGHTING 06/03/04 4.00 800.00 838.84 600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 4.00 800.00 838.84 600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 800.00 838.84 600.00 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 25 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-40010 Light Std Foundation Each =================================================== MTCE 01-041 REGION 1 HIGHWAY LIGHTING 07/29/04 10.00 600.00 835.33 1005.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 600.00 835.33 1005.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 600.00 835.33 1005.00 =============== 613-40020 Transformer Base Alum Each =================================================== MTCE 01-041 REGION 1 HIGHWAY LIGHTING 07/29/04 20.00 700.00 734.33 870.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20.00 700.00 734.33 870.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 700.00 734.33 870.00 =============== 613-40030 Inst Transformer Base Alum Each =================================================== MTCE 02-017 REGION 2 STREET LIGHTING 06/03/04 60.00 300.00 175.68 50.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 60.00 300.00 175.68 50.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 60.00 300.00 175.68 50.00 =============== 613-50010 Photoel Cell Each =================================================== MTCE 02-017 REGION 2 STREET LIGHTING 06/03/04 300.00 100.00 76.88 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 300.00 100.00 76.88 65.00 MTCE 01-041 REGION 1 HIGHWAY LIGHTING 07/29/04 300.00 60.00 71.00 90.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 300.00 60.00 71.00 90.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 600.00 80.00 75.12 77.50 =============== 613-50200 Lighting System Each =================================================== MTCE 02-017 REGION 2 STREET LIGHTING 06/03/04 20.00 350.00 312.84 275.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 20.00 350.00 312.84 275.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 350.00 312.84 275.00 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 26 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-60000 Lmps Each =================================================== MTCE 02-017 REGION 2 STREET LIGHTING 06/03/04 350.00 130.00 96.68 91.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 350.00 130.00 96.68 91.00 MTCE 01-041 REGION 1 HIGHWAY LIGHTING 07/29/04 300.00 70.00 79.00 95.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 300.00 70.00 79.00 95.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 650.00 102.31 91.93 92.85 =============== 613-60500 Underground Rep Each =================================================== MTCE 02-017 REGION 2 STREET LIGHTING 06/03/04 80.00 800.00 681.74 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 80.00 800.00 681.74 350.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 80.00 800.00 681.74 350.00 =============== 613-70255 Fus Each =================================================== MTCE 02-017 REGION 2 STREET LIGHTING 06/03/04 200.00 60.00 49.94 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 200.00 60.00 49.94 30.00 MTCE 01-041 REGION 1 HIGHWAY LIGHTING 07/29/04 50.00 60.00 48.00 53.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 50.00 60.00 48.00 53.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 250.00 60.00 49.75 34.60 =============== 613-70260 Fus Holder Each =================================================== MTCE 02-017 REGION 2 STREET LIGHTING 06/03/04 120.00 100.00 64.64 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 120.00 100.00 64.64 30.00 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 27 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 613-70260 Fus Holder Each =================================================== MTCE 01-041 REGION 1 HIGHWAY LIGHTING 07/29/04 50.00 50.00 93.00 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 50.00 50.00 93.00 110.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 170.00 85.29 68.93 53.53 =============== 613-70400 Lumin HPS (400 W) Each =================================================== MTCE 02-017 REGION 2 STREET LIGHTING 06/03/04 150.00 500.00 448.76 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 150.00 500.00 448.76 300.00 MTCE 01-041 REGION 1 HIGHWAY LIGHTING 07/29/04 300.00 300.00 367.00 470.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 300.00 300.00 367.00 470.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 450.00 366.67 411.03 413.33 =============== 613-72150 Lumin HPS (WT) (150 W) Each =================================================== MTCE 01-041 REGION 1 HIGHWAY LIGHTING 07/29/04 25.00 350.00 478.33 430.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 25.00 350.00 478.33 430.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25.00 350.00 478.33 430.00 =============== 613-80010 Ballast Un Each =================================================== MTCE 02-017 REGION 2 STREET LIGHTING 06/03/04 150.00 350.00 218.87 200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 150.00 350.00 218.87 200.00 MTCE 01-041 REGION 1 HIGHWAY LIGHTING 07/29/04 25.00 200.00 246.00 230.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 25.00 200.00 246.00 230.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 175.00 328.57 220.68 204.29 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 28 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00011 Sign Panel (CL I) Sq Foot ================================================ MTCE 01-037 R-1 SIGNING 01/15/04 2,402.00 15.00 11.14 7.75 MTCE 04-047 R-4 SIGNS SH 14 CENTRAL 03/11/04 899.00 8.00 10.40 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3,301.00 13.09 10.91 8.09 MTCE 04-053 R-4 SIGNS, SH 14 WEST 08/12/04 3,267.00 10.00 10.33 7.00 MTCE 01-043 I-70, LIMON TO KANSAS STATELI 08/19/04 1,829.00 10.00 11.33 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5,096.00 10.00 10.69 7.72 MTCE 01-038 I-70 & SH 91 VMS/ SNOW GATES 10/28/04 6.00 24.00 63.79 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 24.00 63.79 21.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,403.00 11.23 10.88 7.87 =============== 614-00012 Sign Panel (CL II) Sq Foot ================================================ MTCE 01-037 R-1 SIGNING 01/15/04 3,880.00 17.00 15.08 10.75 MTCE 04-047 R-4 SIGNS SH 14 CENTRAL 03/11/04 1,644.00 10.00 13.10 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,524.00 14.92 14.39 11.12 MTCE 04-053 R-4 SIGNS, SH 14 WEST 08/12/04 1,171.00 12.00 14.00 11.50 MTCE 01-043 I-70, LIMON TO KANSAS STATELI 08/19/04 3,202.00 11.00 14.20 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,373.00 11.27 14.15 11.87 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9,897.00 13.30 14.31 11.45 =============== 614-00013 Sign Panel (CL III) Sq Foot ================================================ MTCE 01-037 R-1 SIGNING 01/15/04 9,630.00 19.00 18.63 16.00 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 29 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00013 Sign Panel (CL III) Sq Foot ================================================ MTCE 04-047 R-4 SIGNS SH 14 CENTRAL 03/11/04 1,135.00 12.00 15.70 13.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 10,765.00 18.26 18.25 15.68 MTCE 04-053 R-4 SIGNS, SH 14 WEST 08/12/04 1,685.00 14.00 18.00 17.00 MTCE 01-043 I-70, LIMON TO KANSAS STATELI 08/19/04 6,593.00 17.00 17.72 17.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8,278.00 16.39 17.77 17.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 19,043.00 17.45 18.08 16.26 =============== 614-00025 Inst Sign Panel (CL I) Sq Foot ================================================ MTCE 03-018 R-3 SIGN REPLACEMENT 07/29/04 12,842.00 2.50 4.02 2.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 12,842.00 2.50 4.02 2.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12,842.00 2.50 4.02 2.10 =============== 614-00027 Inst Sign Panel (CL II) Sq Foot ================================================ MTCE 03-018 R-3 SIGN REPLACEMENT 07/29/04 8,046.00 4.50 5.10 2.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8,046.00 4.50 5.10 2.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,046.00 4.50 5.10 2.60 =============== 614-00028 Inst Sign Panel (CL III) Sq Foot ================================================ MTCE 03-018 R-3 SIGN REPLACEMENT 07/29/04 1,843.00 8.00 6.75 3.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,843.00 8.00 6.75 3.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,843.00 8.00 6.75 3.00 =============== 614-00200 Steel Sign Post (U-2) Lin Foot =============================================== MTCE 01-038 I-70 & SH 91 VMS/ SNOW GATES 10/28/04 11.50 20.00 37.32 11.71 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 11.50 20.00 37.32 11.71 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.50 20.00 37.32 11.71 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 30 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-00357 Steel Sign Post (S 3x5.7) Lin Foot =============================================== MTCE 01-043 I-70, LIMON TO KANSAS STATELI 08/19/04 15.00 30.00 28.00 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 15.00 30.00 28.00 30.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15.00 30.00 28.00 30.00 =============== 614-00612 Steel Sign Post (W 6x12) Lin Foot =============================================== MTCE 01-043 I-70, LIMON TO KANSAS STATELI 08/19/04 32.00 35.00 30.00 28.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 32.00 35.00 30.00 28.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 32.00 35.00 30.00 28.00 =============== 614-00615 Steel Sign Post (W 6x15) Lin Foot =============================================== MTCE 01-043 I-70, LIMON TO KANSAS STATELI 08/19/04 59.00 40.00 33.50 32.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 59.00 40.00 33.50 32.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 59.00 40.00 33.50 32.00 =============== 614-00818 Steel Sign Post (W 8x18) Lin Foot =============================================== MTCE 01-043 I-70, LIMON TO KANSAS STATELI 08/19/04 67.00 45.00 37.17 34.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 67.00 45.00 37.17 34.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 67.00 45.00 37.17 34.00 =============== 614-00821 Steel Sign Post (W 8x21) Lin Foot =============================================== MTCE 01-043 I-70, LIMON TO KANSAS STATELI 08/19/04 40.00 50.00 40.83 38.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 40.00 50.00 40.83 38.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 40.00 50.00 40.83 38.00 =============== 614-01022 Steel Sign Post (W 10x22) Lin Foot =============================================== MTCE 01-043 I-70, LIMON TO KANSAS STATELI 08/19/04 76.00 55.00 42.83 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 76.00 55.00 42.83 40.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 76.00 55.00 42.83 40.00 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 31 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01026 Steel Sign Post (W 10x26) Lin Foot =============================================== MTCE 01-043 I-70, LIMON TO KANSAS STATELI 08/19/04 34.00 60.00 45.75 44.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 34.00 60.00 45.75 44.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 34.00 60.00 45.75 44.00 =============== 614-01502 Steel Sign Supp (2-In Rd)(Po&So) Lin Foot =============================================== MTCE 04-047 R-4 SIGNS SH 14 CENTRAL 03/11/04 650.00 7.00 10.00 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 650.00 7.00 10.00 9.00 MTCE 03-018 R-3 SIGN REPLACEMENT 07/29/04 7,483.00 10.00 8.54 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7,483.00 10.00 8.54 8.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 8,133.00 9.76 8.64 8.08 =============== 614-01512 Steel Sign Supp (2-In Rd)(Post) Lin Foot =============================================== MTCE 01-037 R-1 SIGNING 01/15/04 1,932.00 10.00 5.56 3.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,932.00 10.00 5.56 3.25 MTCE 04-053 R-4 SIGNS, SH 14 WEST 08/12/04 2,533.00 5.00 9.67 4.00 MTCE 01-043 I-70, LIMON TO KANSAS STATELI 08/19/04 2,638.00 5.00 7.67 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5,171.00 5.00 8.65 6.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,103.00 6.36 7.62 5.65 =============== 614-01522 Steel Sign Supp (2-In Rd)(Sock) Each =================================================== MTCE 01-037 R-1 SIGNING 01/15/04 206.00 20.00 28.35 38.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 206.00 20.00 28.35 38.00 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 32 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01522 Steel Sign Supp (2-In Rd)(Sock) Each =================================================== MTCE 04-053 R-4 SIGNS, SH 14 WEST 08/12/04 206.00 38.00 45.67 35.00 MTCE 01-043 I-70, LIMON TO KANSAS STATELI 08/19/04 275.00 40.00 22.00 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 481.00 39.14 32.14 26.42 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 687.00 33.40 30.76 29.90 =============== 614-01552 Steel Sign Post (2.5 In Rd) (Slip) Lin Foot =============================================== MTCE 03-018 R-3 SIGN REPLACEMENT 07/29/04 6,890.00 25.00 25.50 23.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6,890.00 25.00 25.50 23.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,890.00 25.00 25.50 23.00 =============== 614-01582 Steel Sign Supp (2-1/2 In Rd)(Po&Slip) Lin Foot =============================================== MTCE 06-039 R-6, SIGN POST REPLACEMENT 01/29/04 4,000.00 22.00 26.13 21.50 MTCE 04-047 R-4 SIGNS SH 14 CENTRAL 03/11/04 1,761.00 20.00 24.60 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,761.00 21.39 25.72 21.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,761.00 21.39 25.72 21.65 =============== 614-01585 Steel Sign Supp (2-1/2 In Rd)(Post) Lin Foot =============================================== MTCE 01-037 R-1 SIGNING 01/15/04 5,340.00 16.00 10.37 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,340.00 16.00 10.37 11.00 MTCE 04-053 R-4 SIGNS, SH 14 WEST 08/12/04 2,668.00 15.00 19.33 13.00 MTCE 01-043 I-70, LIMON TO KANSAS STATELI 08/19/04 3,810.00 12.00 14.67 14.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6,478.00 13.24 16.59 13.59 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11,818.00 14.48 13.33 12.42 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 33 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-01588 Steel Sign Supp (2-1/2 In Rd)(Slip) Each =================================================== MTCE 01-037 R-1 SIGNING 01/15/04 447.00 50.00 110.63 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 447.00 50.00 110.63 80.00 MTCE 04-053 R-4 SIGNS, SH 14 WEST 08/12/04 178.00 85.00 141.67 80.00 MTCE 01-043 I-70, LIMON TO KANSAS STATELI 08/19/04 314.00 100.00 95.67 80.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 492.00 94.57 112.31 80.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 939.00 73.35 111.39 80.00 =============== 614-03001 Conc Footing (Ty 1) Each =================================================== MTCE 01-043 I-70, LIMON TO KANSAS STATELI 08/19/04 2.00 650.00 725.00 625.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 650.00 725.00 625.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 650.00 725.00 625.00 =============== 614-03002 Conc Footing (Ty 2) Each =================================================== MTCE 01-043 I-70, LIMON TO KANSAS STATELI 08/19/04 4.00 700.00 900.00 950.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 700.00 900.00 950.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 700.00 900.00 950.00 =============== 614-03003 Conc Footing (Ty 3) Each =================================================== MTCE 01-043 I-70, LIMON TO KANSAS STATELI 08/19/04 4.00 800.00 1000.00 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 800.00 1000.00 1000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 800.00 1000.00 1000.00 =============== 614-03004 Conc Footing (Ty 4) Each =================================================== MTCE 01-043 I-70, LIMON TO KANSAS STATELI 08/19/04 2.00 850.00 1083.33 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 850.00 1083.33 1000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 850.00 1083.33 1000.00 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 34 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-03005 Conc Footing (Ty 5) Each =================================================== MTCE 01-043 I-70, LIMON TO KANSAS STATELI 08/19/04 4.00 1200.00 1266.67 1100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 1200.00 1266.67 1100.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 1200.00 1266.67 1100.00 =============== 614-03006 Conc Footing (Ty 6) Each =================================================== MTCE 01-043 I-70, LIMON TO KANSAS STATELI 08/19/04 2.00 1600.00 1450.00 1300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 1600.00 1450.00 1300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 1600.00 1450.00 1300.00 =============== 614-10050 Mod Overhead Sign Str Each =================================================== MTCE 01-037 R-1 SIGNING 01/15/04 3.00 4000.00 1616.10 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 4000.00 1616.10 1500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 4000.00 1616.10 1500.00 =============== 614-10120 Var Mesg Sign Each =================================================== MTCE 01-038 I-70 & SH 91 VMS/ SNOW GATES 10/28/04 1.00 150000.00 132329.87 123547.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 150000.00 132329.87 123547.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 150000.00 132329.87 123547.00 =============== 614-32400 Monotube Overhead Sign Cant (24 In Dia) Each =================================================== MTCE 01-038 I-70 & SH 91 VMS/ SNOW GATES 10/28/04 1.00 35000.00 32186.55 26929.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 35000.00 32186.55 26929.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 35000.00 32186.55 26929.00 =============== 614-72855 Traf Sig Ctrl Cabinet Each =================================================== MTCE 01-036 R-1 CONTROLLER CABINETS 06/24/04 23.00 20000.00 14537.71 12000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 23.00 20000.00 14537.71 12000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 23.00 20000.00 14537.71 12000.00 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 35 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-72872 Loop Detect (Micro Type) Each =================================================== MTCE 06-044 R-6 SIGNAL INTERSECTIONS 06/17/04 13.00 370.00 389.35 420.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 13.00 370.00 389.35 420.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 13.00 370.00 389.35 420.00 =============== 614-72875 Loop Detect Wire Lin Foot =============================================== MTCE 06-044 R-6 SIGNAL INTERSECTIONS 06/17/04 6,660.00 3.00 2.52 2.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6,660.00 3.00 2.52 2.60 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 6,660.00 3.00 2.52 2.60 =============== 614-72876 Detect Amp (Loop) (2) Each =================================================== MTCE 06-044 R-6 SIGNAL INTERSECTIONS 06/17/04 36.00 650.00 559.99 160.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 36.00 650.00 559.99 160.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 36.00 650.00 559.99 160.00 =============== 614-72886 Intersection Detect Sys (Camera) Each =================================================== MTCE 06-041 SH 6 AT W. 19TH STREET 03/18/04 2.00 6000.00 5478.75 5170.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 6000.00 5478.75 5170.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 6000.00 5478.75 5170.00 =============== 614-72889 Detect (Micro) (Non-Invasive) Each =================================================== MTCE 06-041 SH 6 AT W. 19TH STREET 03/18/04 4.00 500.00 575.75 471.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 4.00 500.00 575.75 471.00 MTCE 06-044 R-6 SIGNAL INTERSECTIONS 06/17/04 22.00 500.00 743.77 695.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 22.00 500.00 743.77 695.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26.00 500.00 725.61 660.54 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 36 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 614-85001 Impact Atten Each =================================================== MTCE 03-019R HWYS 70, 82, 50, 133, 141, 92 09/16/04 3.00 15800.00 15851.80 12500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 15800.00 15851.80 12500.00 MTCE 06-052 INTERSTATE 25 SB AT EXIT 213 10/14/04 1.00 22000.00 25083.25 23000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 22000.00 25083.25 23000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 17350.00 19544.38 15125.00 =============== 614-85040 Impact Atten (T-M-A) Each =================================================== MTCE 03-015 R3 EXPANSION JOINT REPAIR 02/12/04 2.00 5000.00 3784.38 2250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 5000.00 3784.38 2250.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 5000.00 3784.38 2250.00 =============== 614-87413 Fiber Optic Cable (M Mode) (12 S) Lin Foot =============================================== MTCE 01-041 REGION 1 HIGHWAY LIGHTING 07/29/04 24,000.00 2.50 2.77 1.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 24,000.00 2.50 2.77 1.95 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 24,000.00 2.50 2.77 1.95 =============== 620-00012 Field Lab (CL 2) Each =================================================== MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 1.00 7500.00 6108.82 3300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 7500.00 6108.82 3300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 7500.00 6108.82 3300.00 =============== 620-00020 Sanitary Facility Each =================================================== MTCE 06-046 I-70 & C-470 ALTERNATE PAVEME 08/19/04 2.00 800.00 428.75 350.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 800.00 428.75 350.00 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 37 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 620-00020 Sanitary Facility Each =================================================== MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 1.00 750.00 727.77 330.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 750.00 727.77 330.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 783.33 608.16 340.00 =============== 625-00000 Const Surveying LUMP SUM =============================================== MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 1.00 1500.00 7575.68 15500.00 MTCE 01-038 I-70 & SH 91 VMS/ SNOW GATES 10/28/04 1.00 8000.00 3239.44 1050.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 4750.00 5097.83 8275.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 4750.00 5097.83 8275.00 =============== 626-00000 Mobilization LUMP SUM =============================================== MTCE 01-032 R-1 STENCIL MARKING 01/08/04 1.00 15000.00 8400.00 5000.00 MTCE 01-035 R-1 STRIPING 01/08/04 1.00 10000.00 4166.33 3000.00 MTCE 01-037 R-1 SIGNING 01/15/04 1.00 20000.00 11040.63 10000.00 MTCE 02-015 REGION 2 STRIPING 02/05/04 1.00 2000.00 3666.67 5000.00 MTCE 04-050 R-4 EPOXY SH 34 EAST 03/11/04 1.00 4000.00 2000.00 1000.00 MTCE 04-047 R-4 SIGNS SH 14 CENTRAL 03/11/04 1.00 5000.00 10380.00 5000.00 MTCE 04-049 CONCRETE SLABS ON I-25 03/18/04 1.00 75000.00 164825.00 74000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 7.00 18714.29 30624.50 14714.29 MTCE 01-034 REGION 1 FY 05 STRIPING 04/22/04 1.00 30000.00 7143.13 800.00 MTCE 02-018 REGION 2 STRIPING 06/03/04 1.00 5000.00 4625.00 5000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 17500.00 5884.06 2900.00 MTCE 04-052 FY 05 REGION 4 STENCIL MARKIN 07/22/04 1.00 17000.00 7250.00 500.00 MTCE 06-042 R6 - EXPANSION JOINT REPAIR 07/29/04 1.00 25000.00 70000.00 30000.00 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 38 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 626-00000 Mobilization LUMP SUM =============================================== MTCE 03-018 R-3 SIGN REPLACEMENT 07/29/04 1.00 35000.00 19500.00 10000.00 MTCE 04-048 FY 05 R 4 QUALITY EPOXY PAVEM 08/05/04 1.00 9000.00 12625.00 1000.00 MTCE 04-055 R-4 EPOXY EAST 08/05/04 1.00 5000.00 5625.00 2500.00 MTCE 04-054 R-4 EPOXY WEST 08/05/04 1.00 5000.00 5625.00 5000.00 MTCE 06-049 VARIOUS R-6 STRIPING 08/12/04 1.00 15000.00 20333.33 1000.00 MTCE 04-053 R-4 SIGNS, SH 14 WEST 08/12/04 1.00 10000.00 17666.67 10000.00 MTCE 06-046 I-70 & C-470 ALTERNATE PAVEME 08/19/04 1.00 10000.00 62410.00 50000.00 MTCE 01-043 I-70, LIMON TO KANSAS STATELI 08/19/04 1.00 10000.00 21150.00 25000.00 MTCE 06-043R R-6, BRIDGE RAIL REPLACEMENT 08/26/04 1.00 30000.00 45900.00 31800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 11.00 15083.33 22314.39 15163.64 MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 1.00 25000.00 43220.00 18500.00 MTCE 01-038 I-70 & SH 91 VMS/ SNOW GATES 10/28/04 1.00 40000.00 21898.47 21332.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 32500.00 31036.27 19916.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 22.00 17913.04 24703.69 14337.82 =============== 627-00001 Pvmt Mkg Paint Gallon ================================================= MTCE 06-041 SH 6 AT W. 19TH STREET 03/18/04 3.00 100.00 519.38 535.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 100.00 519.38 535.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 100.00 519.38 535.00 =============== 627-00002 Thermoplastic Pvmt Mkg Sq Foot ================================================ MTCE 06-041 SH 6 AT W. 19TH STREET 03/18/04 100.00 10.00 16.15 16.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 100.00 10.00 16.15 16.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 100.00 10.00 16.15 16.10 =============== 627-00003 Thermoplastic Pvmt Mkg (Inlaid) Sq Foot ================================================ MTCE 06-049 VARIOUS R-6 STRIPING 08/12/04 4,500.00 10.00 7.50 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4,500.00 10.00 7.50 10.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4,500.00 10.00 7.50 10.00 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 39 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-00004 Epoxy Pvmt Mkg Sq Foot ================================================ MTCE 01-033 FAIRPLAY - MORRISON, EPOXY 01/08/04 231,000.00 0.50 0.91 0.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 231,000.00 0.50 0.91 0.75 MTCE 04-048 FY 05 R 4 QUALITY EPOXY PAVEM 08/05/04 273,407.00 0.70 0.74 0.65 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 273,407.00 0.70 0.74 0.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 504,407.00 0.61 0.82 0.70 =============== 627-00005 Epoxy Pvmt Mkg Gallon ================================================= MTCE 01-035 R-1 STRIPING 01/08/04 27,648.00 34.00 31.79 29.13 MTCE 02-015 REGION 2 STRIPING 02/05/04 32,759.00 30.50 33.45 32.50 MTCE 04-050 R-4 EPOXY SH 34 EAST 03/11/04 7,418.00 31.00 31.63 31.50 MTCE 04-049 CONCRETE SLABS ON I-25 03/18/04 16.00 325.00 282.25 225.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 67,841.00 32.05 32.65 31.06 MTCE 01-034 REGION 1 FY 05 STRIPING 04/22/04 20,661.00 33.00 31.48 32.00 MTCE 02-018 REGION 2 STRIPING 06/03/04 36,530.00 32.00 31.50 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 57,191.00 32.36 31.49 30.72 MTCE 01-040 I-25, NEAR LARKSPUR 07/29/04 200.00 60.00 69.08 82.25 MTCE 04-055 R-4 EPOXY EAST 08/05/04 34,682.00 30.00 34.23 31.00 MTCE 04-054 R-4 EPOXY WEST 08/05/04 16,853.00 30.00 33.18 33.00 MTCE 06-049 VARIOUS R-6 STRIPING 08/12/04 10,000.00 45.00 37.52 34.85 MTCE 06-046 I-70 & C-470 ALTERNATE PAVEME 08/19/04 716.00 50.00 71.73 76.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 62,451.00 32.73 34.66 32.59 MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 217.00 55.00 82.33 87.55 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 217.00 55.00 82.33 87.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 187,700.00 32.40 33.07 31.53 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 40 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-00012 Pvmt Mkg Paint (Low VOC Solvent Base) Gallon ================================================= MTCE 06-046 I-70 & C-470 ALTERNATE PAVEME 08/19/04 650.00 35.00 36.05 33.70 MTCE 06-043R R-6, BRIDGE RAIL REPLACEMENT 08/26/04 35.00 50.00 83.00 76.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 685.00 35.77 38.45 37.81 MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 250.00 35.00 52.93 52.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 250.00 35.00 52.93 52.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 935.00 35.56 46.02 43.83 =============== 627-01000 Preform Plastic Pvmt Mkg (Ty A) Sq Foot ================================================ MTCE 06-049 VARIOUS R-6 STRIPING 08/12/04 7,000.00 9.00 7.94 7.00 MTCE 06-046 I-70 & C-470 ALTERNATE PAVEME 08/19/04 13,222.00 8.50 9.05 9.60 MTCE 06-043R R-6, BRIDGE RAIL REPLACEMENT 08/26/04 1,700.00 9.00 9.95 9.90 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 21,922.00 8.70 8.65 8.44 MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 2,710.00 9.00 9.40 9.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2,710.00 9.00 9.40 9.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 24,632.00 8.73 8.83 8.57 =============== 627-01003 Preform Plastic Pvmt Mkg (Ty A) (Inlaid) Sq Foot ================================================ MTCE 01-034 REGION 1 FY 05 STRIPING 04/22/04 9,451.00 11.00 8.60 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 9,451.00 11.00 8.60 8.00 MTCE 06-049 VARIOUS R-6 STRIPING 08/12/04 25,000.00 10.00 9.32 8.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 25,000.00 10.00 9.32 8.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 34,451.00 10.27 9.08 8.36 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 41 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-03000 Preform Plastic Pvmt Mkg (Ty C) Sq Foot ================================================ MTCE 06-049 VARIOUS R-6 STRIPING 08/12/04 10,000.00 9.00 8.18 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10,000.00 9.00 8.18 7.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10,000.00 9.00 8.18 7.00 =============== 627-03003 Preform Plastic Pvmt Mkg (Ty C) (Inlaid) Sq Foot ================================================ MTCE 01-034 REGION 1 FY 05 STRIPING 04/22/04 27,967.00 11.00 8.79 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 27,967.00 11.00 8.79 8.00 MTCE 06-049 VARIOUS R-6 STRIPING 08/12/04 20,000.00 11.00 9.74 8.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20,000.00 11.00 9.74 8.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 47,967.00 11.00 9.12 8.21 =============== 627-30210 Thermoplastic Pvmt Mkg (XS) Sq Foot ================================================ MTCE 01-032 R-1 STENCIL MARKING 01/08/04 70,273.00 2.50 4.59 2.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 70,273.00 2.50 4.59 2.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 70,273.00 2.50 4.59 2.50 =============== 627-30405 Preform Thermoplastic Pvmt Mkg (WS) Sq Foot ================================================ MTCE 01-032 R-1 STENCIL MARKING 01/08/04 15,572.50 9.00 7.93 6.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 15,572.50 9.00 7.93 6.75 MTCE 04-052 FY 05 REGION 4 STENCIL MARKIN 07/22/04 10,732.00 8.00 8.26 7.28 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10,732.00 8.00 8.26 7.28 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 26,304.50 8.59 8.08 6.97 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 42 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 627-30410 Preform Thermoplastic Pvmt Mkg (XS) Sq Foot ================================================ MTCE 02-018 REGION 2 STRIPING 06/03/04 13,632.00 7.00 6.42 7.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 13,632.00 7.00 6.42 7.00 MTCE 04-052 FY 05 REGION 4 STENCIL MARKIN 07/22/04 40,366.00 5.00 5.70 4.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 40,366.00 5.00 5.70 4.95 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 53,998.00 5.50 5.83 5.47 =============== 630-00000 Flagging Hour =================================================== MTCE 06-040 VARIOUS LOCATIONS IN REGION 6 01/08/04 160.00 22.00 26.48 17.00 MTCE 06-039 R-6, SIGN POST REPLACEMENT 01/29/04 80.00 20.00 32.63 14.25 MTCE 03-015 R3 EXPANSION JOINT REPAIR 02/12/04 544.00 20.00 22.08 19.80 MTCE 06-041 SH 6 AT W. 19TH STREET 03/18/04 160.00 20.00 21.33 19.30 MTCE 04-049 CONCRETE SLABS ON I-25 03/18/04 440.00 20.00 19.79 20.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,384.00 20.23 22.97 19.16 MTCE 01-039 I70, EAST OF DENVER 04/01/04 88.00 22.00 21.53 18.00 MTCE 02-018 REGION 2 STRIPING 06/03/04 50.00 20.00 18.00 25.00 MTCE 06-044 R-6 SIGNAL INTERSECTIONS 06/17/04 800.00 20.00 20.86 17.85 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 938.00 20.19 20.80 18.25 MTCE 03-018 R-3 SIGN REPLACEMENT 07/29/04 200.00 20.00 19.83 14.00 MTCE 06-049 VARIOUS R-6 STRIPING 08/12/04 240.00 25.00 23.33 20.00 MTCE 06-046 I-70 & C-470 ALTERNATE PAVEME 08/19/04 200.00 25.00 23.75 25.00 MTCE 03-017 R-3, EXPANSION JOINT REPAIRS 08/19/04 750.00 20.00 28.50 38.50 MTCE 06-043R R-6, BRIDGE RAIL REPLACEMENT 08/26/04 48.00 20.00 20.00 20.00 MTCE 05-034R US 550, SOUTH OF DURANGO 09/02/04 600.00 25.00 21.75 17.00 MTCE 03-019R HWYS 70, 82, 50, 133, 141, 92 09/16/04 400.00 22.00 25.69 25.00 MTCE 03-020R R3 EXPANSION JOINT REPAIRS ON 09/16/04 200.00 23.00 24.50 24.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,638.00 22.50 24.03 25.62 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 43 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00000 Flagging Hour =================================================== MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 100.00 22.00 20.45 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 100.00 22.00 20.45 16.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,060.00 21.44 22.74 22.23 =============== 630-00001 Pilot Car Operation Hour =================================================== MTCE 05-034R US 550, SOUTH OF DURANGO 09/02/04 80.00 45.00 32.00 28.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 80.00 45.00 32.00 28.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 80.00 45.00 32.00 28.00 =============== 630-00003 Uniformed Traf Ctrl Hour =================================================== MTCE 06-042 R6 - EXPANSION JOINT REPAIR 07/29/04 500.00 55.00 36.00 17.00 MTCE 06-043R R-6, BRIDGE RAIL REPLACEMENT 08/26/04 48.00 55.00 71.00 72.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 548.00 55.00 39.07 21.82 MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 100.00 65.00 56.46 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 100.00 65.00 56.46 65.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 648.00 56.54 45.22 28.48 =============== 630-00007 Traf Ctrl Inspection Day ==================================================== MTCE 06-046 I-70 & C-470 ALTERNATE PAVEME 08/19/04 20.00 85.00 107.50 120.00 MTCE 03-017 R-3, EXPANSION JOINT REPAIRS 08/19/04 45.00 90.00 163.33 165.00 MTCE 05-034R US 550, SOUTH OF DURANGO 09/02/04 4.00 100.00 83.75 80.00 MTCE 03-020R R3 EXPANSION JOINT REPAIRS ON 09/16/04 8.00 180.00 185.00 185.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 77.00 98.57 146.58 155.60 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 44 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00007 Traf Ctrl Inspection Day ==================================================== MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 10.00 85.00 98.70 45.00 MTCE 01-038 I-70 & SH 91 VMS/ SNOW GATES 10/28/04 10.00 100.00 121.12 131.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 20.00 92.50 111.51 88.13 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 97.00 97.32 132.10 140.09 =============== 630-00009 Traf Ctrl Vehicle (Truck) Each =================================================== MTCE 03-015 R3 EXPANSION JOINT REPAIR 02/12/04 2.00 11000.00 2362.50 2250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 11000.00 2362.50 2250.00 MTCE 06-042 R6 - EXPANSION JOINT REPAIR 07/29/04 2.00 7000.00 5950.00 3900.00 MTCE 06-046 I-70 & C-470 ALTERNATE PAVEME 08/19/04 2.00 2500.00 10706.25 11825.00 MTCE 06-043R R-6, BRIDGE RAIL REPLACEMENT 08/26/04 2.00 7000.00 3341.50 3333.00 MTCE 03-020R R3 EXPANSION JOINT REPAIRS ON 09/16/04 1.00 3000.00 2125.00 2125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7.00 5142.86 6316.62 4736.00 MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 2.00 2500.00 7458.28 5500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 2500.00 7458.28 5500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 5727.27 5773.19 4391.60 =============== 630-00012 Traf Ctrl Mgmt Day ==================================================== MTCE 06-040 VARIOUS LOCATIONS IN REGION 6 01/08/04 20.00 350.00 537.10 275.00 MTCE 06-039 R-6, SIGN POST REPLACEMENT 01/29/04 10.00 300.00 361.68 151.00 MTCE 03-015 R3 EXPANSION JOINT REPAIR 02/12/04 34.00 400.00 389.06 330.00 MTCE 06-041 SH 6 AT W. 19TH STREET 03/18/04 20.00 325.00 336.25 375.00 MTCE 04-049 CONCRETE SLABS ON I-25 03/18/04 140.00 400.00 512.75 425.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 224.00 384.38 475.25 380.49 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 45 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-00012 Traf Ctrl Mgmt Day ==================================================== MTCE 01-039 I70, EAST OF DENVER 04/01/04 11.00 300.00 418.00 340.00 MTCE 02-018 REGION 2 STRIPING 06/03/04 20.00 400.00 237.50 250.00 MTCE 06-044 R-6 SIGNAL INTERSECTIONS 06/17/04 100.00 350.00 385.64 346.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 131.00 353.44 371.24 330.84 MTCE 06-042 R6 - EXPANSION JOINT REPAIR 07/29/04 60.00 350.00 462.50 500.00 MTCE 01-040 I-25, NEAR LARKSPUR 07/29/04 20.00 350.00 510.00 450.00 MTCE 03-018 R-3 SIGN REPLACEMENT 07/29/04 175.00 400.00 269.17 265.00 MTCE 06-049 VARIOUS R-6 STRIPING 08/12/04 30.00 350.00 300.00 300.00 MTCE 06-046 I-70 & C-470 ALTERNATE PAVEME 08/19/04 40.00 350.00 416.25 445.00 MTCE 03-017 R-3, EXPANSION JOINT REPAIRS 08/19/04 150.00 370.00 715.00 550.00 MTCE 06-043R R-6, BRIDGE RAIL REPLACEMENT 08/26/04 30.00 350.00 394.50 389.00 MTCE 05-034R US 550, SOUTH OF DURANGO 09/02/04 8.00 400.00 393.75 400.00 MTCE 03-019R HWYS 70, 82, 50, 133, 141, 92 09/16/04 50.00 383.00 349.88 340.00 MTCE 03-020R R3 EXPANSION JOINT REPAIRS ON 09/16/04 20.00 415.00 500.00 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 583.00 375.90 403.51 404.34 MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 45.00 350.00 342.48 235.00 MTCE 01-038 I-70 & SH 91 VMS/ SNOW GATES 10/28/04 10.00 400.00 664.94 630.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 55.00 359.09 416.18 306.82 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 993.00 373.92 415.93 383.44 =============== 630-00025 Traf Ctrl Vehicle Hour =================================================== MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 100.00 30.00 27.55 12.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 100.00 30.00 27.55 12.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 100.00 30.00 27.55 12.00 =============== 630-10005 Traf Ctrl LUMP SUM =============================================== MTCE 01-037 R-1 SIGNING 01/15/04 1.00 25000.00 22830.87 10000.00 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 46 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-10005 Traf Ctrl LUMP SUM =============================================== MTCE 04-047 R-4 SIGNS SH 14 CENTRAL 03/11/04 1.00 15000.00 16220.00 8100.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 20000.00 19158.16 9050.00 MTCE 02-017 REGION 2 STREET LIGHTING 06/03/04 1.00 28000.00 25122.16 16800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1.00 28000.00 25122.16 16800.00 MTCE 04-052 FY 05 REGION 4 STENCIL MARKIN 07/22/04 1.00 40000.00 13595.83 500.00 MTCE 04-053 R-4 SIGNS, SH 14 WEST 08/12/04 1.00 15000.00 26666.67 10000.00 MTCE 01-043 I-70, LIMON TO KANSAS STATELI 08/19/04 1.00 15000.00 29593.33 25000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 23333.33 20862.92 11833.33 MTCE 06-052 INTERSTATE 25 SB AT EXIT 213 10/14/04 1.00 6000.00 4524.00 2500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 6000.00 4524.00 2500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7.00 20571.43 19272.80 10414.29 =============== 630-80001 Flash Beacon (Port) Each =================================================== MTCE 06-043R R-6, BRIDGE RAIL REPLACEMENT 08/26/04 4.00 900.00 341.50 333.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 900.00 341.50 333.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 900.00 341.50 333.00 =============== 630-80305 Flagging Station Light Each =================================================== MTCE 03-017 R-3, EXPANSION JOINT REPAIRS 08/19/04 2.00 800.00 2883.33 3850.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 800.00 2883.33 3850.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 800.00 2883.33 3850.00 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 47 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80341 Const Traf Sign (A) Each =================================================== MTCE 04-049 CONCRETE SLABS ON I-25 03/18/04 1.00 60.00 82.25 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 60.00 82.25 65.00 MTCE 02-018 REGION 2 STRIPING 06/03/04 2.00 60.00 23.75 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 2.00 60.00 23.75 10.00 MTCE 06-042 R6 - EXPANSION JOINT REPAIR 07/29/04 4.00 60.00 70.00 90.00 MTCE 06-046 I-70 & C-470 ALTERNATE PAVEME 08/19/04 12.00 45.00 46.25 40.00 MTCE 03-017 R-3, EXPANSION JOINT REPAIRS 08/19/04 8.00 50.00 63.67 66.00 MTCE 06-043R R-6, BRIDGE RAIL REPLACEMENT 08/26/04 2.00 60.00 55.50 55.00 MTCE 05-034R US 550, SOUTH OF DURANGO 09/02/04 22.00 40.00 22.25 9.00 MTCE 03-019R HWYS 70, 82, 50, 133, 141, 92 09/16/04 4.00 60.00 58.48 57.00 MTCE 03-020R R3 EXPANSION JOINT REPAIRS ON 09/16/04 4.00 60.00 66.75 66.75 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 56.00 47.50 38.21 38.62 MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 6.00 45.00 51.43 45.00 MTCE 01-038 I-70 & SH 91 VMS/ SNOW GATES 10/28/04 2.00 70.00 27.39 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 8.00 51.25 44.04 39.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 67.00 48.51 39.83 38.16 =============== 630-80342 Const Traf Sign (B) Each =================================================== MTCE 06-040 VARIOUS LOCATIONS IN REGION 6 01/08/04 10.00 25.00 89.37 50.00 MTCE 06-039 R-6, SIGN POST REPLACEMENT 01/29/04 8.00 15.00 73.50 37.50 MTCE 03-015 R3 EXPANSION JOINT REPAIR 02/12/04 36.00 90.00 72.81 88.00 MTCE 06-041 SH 6 AT W. 19TH STREET 03/18/04 15.00 30.00 51.25 22.00 MTCE 04-049 CONCRETE SLABS ON I-25 03/18/04 28.00 70.00 170.88 165.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 97.00 62.06 97.88 91.94 MTCE 01-039 I70, EAST OF DENVER 04/01/04 36.00 90.00 42.88 45.00 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 48 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80342 Const Traf Sign (B) Each =================================================== MTCE 02-018 REGION 2 STRIPING 06/03/04 38.00 100.00 23.75 10.00 MTCE 06-044 R-6 SIGNAL INTERSECTIONS 06/17/04 16.00 80.00 56.65 54.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 90.00 92.44 38.83 31.82 MTCE 06-042 R6 - EXPANSION JOINT REPAIR 07/29/04 26.00 70.00 137.50 165.00 MTCE 01-040 I-25, NEAR LARKSPUR 07/29/04 13.00 70.00 73.00 55.00 MTCE 03-018 R-3 SIGN REPLACEMENT 07/29/04 25.00 55.00 63.67 22.00 MTCE 06-049 VARIOUS R-6 STRIPING 08/12/04 10.00 100.00 40.00 50.00 MTCE 06-046 I-70 & C-470 ALTERNATE PAVEME 08/19/04 40.00 50.00 76.25 70.00 MTCE 03-017 R-3, EXPANSION JOINT REPAIRS 08/19/04 44.00 70.00 70.67 77.00 MTCE 06-043R R-6, BRIDGE RAIL REPLACEMENT 08/26/04 38.00 70.00 73.50 72.00 MTCE 05-034R US 550, SOUTH OF DURANGO 09/02/04 26.00 60.00 23.50 9.00 MTCE 03-019R HWYS 70, 82, 50, 133, 141, 92 09/16/04 18.00 75.00 58.48 57.00 MTCE 03-020R R3 EXPANSION JOINT REPAIRS ON 09/16/04 9.00 67.00 78.00 78.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 249.00 65.69 66.40 67.86 MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 20.00 50.00 101.32 255.00 MTCE 01-038 I-70 & SH 91 VMS/ SNOW GATES 10/28/04 14.00 80.00 54.16 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 34.00 62.35 78.55 158.65 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 470.00 69.83 69.62 72.70 =============== 630-80343 Const Traf Sign (C) Each =================================================== MTCE 04-049 CONCRETE SLABS ON I-25 03/18/04 28.00 80.00 190.50 180.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 28.00 80.00 190.50 180.00 MTCE 06-042 R6 - EXPANSION JOINT REPAIR 07/29/04 6.00 100.00 152.50 170.00 MTCE 01-040 I-25, NEAR LARKSPUR 07/29/04 13.00 90.00 76.67 60.00 MTCE 06-046 I-70 & C-470 ALTERNATE PAVEME 08/19/04 16.00 50.00 87.50 90.00 MTCE 03-017 R-3, EXPANSION JOINT REPAIRS 08/19/04 6.00 75.00 77.67 88.00 MTCE 06-043R R-6, BRIDGE RAIL REPLACEMENT 08/26/04 4.00 100.00 73.50 72.00 MTCE 03-019R HWYS 70, 82, 50, 133, 141, 92 09/16/04 10.00 80.00 58.48 57.00 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 49 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80343 Const Traf Sign (C) Each =================================================== MTCE 03-020R R3 EXPANSION JOINT REPAIRS ON 09/16/04 11.00 72.00 89.00 89.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 66.00 75.94 83.96 84.22 MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 8.00 50.00 106.49 205.00 MTCE 01-038 I-70 & SH 91 VMS/ SNOW GATES 10/28/04 10.00 90.00 67.79 21.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 18.00 72.22 82.31 102.78 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 112.00 76.36 114.80 113.22 =============== 630-80344 Const Traf Sign (Spec) Sq Foot ================================================ MTCE 06-046 I-70 & C-470 ALTERNATE PAVEME 08/19/04 180.00 17.00 20.43 23.70 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 180.00 17.00 20.43 23.70 MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 45.00 17.00 21.66 55.00 MTCE 01-038 I-70 & SH 91 VMS/ SNOW GATES 10/28/04 64.00 25.00 9.13 8.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 109.00 21.70 13.46 27.64 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 289.00 18.77 15.65 25.86 =============== 630-80355 Port Mesg Panel Each =================================================== MTCE 03-015 R3 EXPANSION JOINT REPAIR 02/12/04 2.00 10000.00 1586.88 2200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 10000.00 1586.88 2200.00 MTCE 06-042 R6 - EXPANSION JOINT REPAIR 07/29/04 2.00 7000.00 6500.00 6000.00 MTCE 01-040 I-25, NEAR LARKSPUR 07/29/04 2.00 5000.00 2718.67 3200.00 MTCE 06-046 I-70 & C-470 ALTERNATE PAVEME 08/19/04 4.00 4000.00 3166.25 2365.00 MTCE 03-017 R-3, EXPANSION JOINT REPAIRS 08/19/04 2.00 7500.00 11700.00 22000.00 MTCE 06-043R R-6, BRIDGE RAIL REPLACEMENT 08/26/04 2.00 7000.00 3625.00 3850.00 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 50 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80355 Port Mesg Panel Each =================================================== MTCE 03-019R HWYS 70, 82, 50, 133, 141, 92 09/16/04 2.00 2300.00 2911.51 2825.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 14.00 5257.14 5124.63 6706.67 MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 2.00 8000.00 4082.22 4200.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 8000.00 4082.22 4200.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18.00 6088.89 4339.80 5830.00 =============== 630-80358 Flash Arrow Panel (C Ty) Each =================================================== MTCE 06-040 VARIOUS LOCATIONS IN REGION 6 01/08/04 2.00 300.00 769.76 500.00 MTCE 06-039 R-6, SIGN POST REPLACEMENT 01/29/04 1.00 200.00 1370.53 499.00 MTCE 03-015 R3 EXPANSION JOINT REPAIR 02/12/04 2.00 750.00 856.25 1100.00 MTCE 06-041 SH 6 AT W. 19TH STREET 03/18/04 2.00 500.00 646.50 321.00 MTCE 04-049 CONCRETE SLABS ON I-25 03/18/04 2.00 900.00 4070.00 4500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9.00 566.67 1445.04 1482.33 MTCE 01-039 I70, EAST OF DENVER 04/01/04 2.00 1200.00 495.00 600.00 MTCE 02-018 REGION 2 STRIPING 06/03/04 2.00 1000.00 212.50 100.00 MTCE 06-044 R-6 SIGNAL INTERSECTIONS 06/17/04 2.00 750.00 1232.78 1622.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 6.00 983.33 730.48 774.00 MTCE 06-042 R6 - EXPANSION JOINT REPAIR 07/29/04 4.00 900.00 2625.00 750.00 MTCE 01-040 I-25, NEAR LARKSPUR 07/29/04 2.00 1000.00 790.00 600.00 MTCE 06-049 VARIOUS R-6 STRIPING 08/12/04 2.00 1000.00 203.33 150.00 MTCE 06-046 I-70 & C-470 ALTERNATE PAVEME 08/19/04 4.00 500.00 722.50 590.00 MTCE 03-017 R-3, EXPANSION JOINT REPAIRS 08/19/04 2.00 800.00 4466.67 3300.00 MTCE 06-043R R-6, BRIDGE RAIL REPLACEMENT 08/26/04 2.00 900.00 652.50 505.00 MTCE 03-019R HWYS 70, 82, 50, 133, 141, 92 09/16/04 1.00 875.00 1164.60 1130.00 MTCE 03-020R R3 EXPANSION JOINT REPAIRS ON 09/16/04 1.00 775.00 1000.00 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 18.00 813.89 1597.05 963.75 MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 2.00 500.00 1193.43 1375.00 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 51 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80358 Flash Arrow Panel (C Ty) Each =================================================== MTCE 01-038 I-70 & SH 91 VMS/ SNOW GATES 10/28/04 2.00 1000.00 445.89 157.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 750.00 766.26 766.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 37.00 774.32 1212.55 1042.00 =============== 630-80359 Port Mesg Panel Day ==================================================== MTCE 04-049 CONCRETE SLABS ON I-25 03/18/04 140.00 100.00 148.75 155.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 140.00 100.00 148.75 155.00 MTCE 03-020R R3 EXPANSION JOINT REPAIRS ON 09/16/04 20.00 84.00 112.00 112.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 20.00 84.00 112.00 112.00 MTCE 01-038 I-70 & SH 91 VMS/ SNOW GATES 10/28/04 12.00 200.00 153.81 131.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 12.00 200.00 153.81 131.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 172.00 105.12 148.38 148.34 =============== 630-80360 Drum Channel Dev Each =================================================== MTCE 03-015 R3 EXPANSION JOINT REPAIR 02/12/04 200.00 40.00 39.50 38.00 MTCE 06-041 SH 6 AT W. 19TH STREET 03/18/04 15.00 40.00 32.00 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 215.00 40.00 38.98 36.88 MTCE 06-042 R6 - EXPANSION JOINT REPAIR 07/29/04 15.00 40.00 65.50 66.00 MTCE 01-040 I-25, NEAR LARKSPUR 07/29/04 15.00 50.00 58.33 45.00 MTCE 06-046 I-70 & C-470 ALTERNATE PAVEME 08/19/04 100.00 40.00 25.05 23.70 MTCE 03-017 R-3, EXPANSION JOINT REPAIRS 08/19/04 100.00 35.00 49.67 44.00 MTCE 06-043R R-6, BRIDGE RAIL REPLACEMENT 08/26/04 50.00 40.00 36.50 38.00 MTCE 05-034R US 550, SOUTH OF DURANGO 09/02/04 10.00 50.00 23.00 9.00 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 52 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80360 Drum Channel Dev Each =================================================== MTCE 03-020R R3 EXPANSION JOINT REPAIRS ON 09/16/04 50.00 44.00 33.50 33.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 340.00 39.85 40.19 37.64 MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 50.00 40.00 55.24 110.00 MTCE 01-038 I-70 & SH 91 VMS/ SNOW GATES 10/28/04 50.00 60.00 16.87 10.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 100.00 50.00 33.32 60.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 655.00 41.45 37.67 41.11 =============== 630-80364 Drum Channel Dev (Light) (SB) Each =================================================== MTCE 03-017 R-3, EXPANSION JOINT REPAIRS 08/19/04 100.00 40.00 66.00 55.00 MTCE 03-020R R3 EXPANSION JOINT REPAIRS ON 09/16/04 50.00 50.00 44.50 44.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 150.00 43.33 62.93 51.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 150.00 43.33 62.93 51.50 =============== 630-80370 Conc Barrier (Temp) Lin Foot =============================================== MTCE 06-043R R-6, BRIDGE RAIL REPLACEMENT 08/26/04 700.00 13.00 17.00 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 700.00 13.00 17.00 16.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 700.00 13.00 17.00 16.00 =============== 630-80380 Traffic Cone Each =================================================== MTCE 06-040 VARIOUS LOCATIONS IN REGION 6 01/08/04 200.00 12.00 12.73 8.00 MTCE 06-039 R-6, SIGN POST REPLACEMENT 01/29/04 100.00 10.00 9.12 5.00 MTCE 06-041 SH 6 AT W. 19TH STREET 03/18/04 200.00 9.00 5.88 5.50 MTCE 04-049 CONCRETE SLABS ON I-25 03/18/04 200.00 10.00 17.60 16.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 700.00 10.29 11.69 9.14 MTCE 01-039 I70, EAST OF DENVER 04/01/04 200.00 10.00 5.15 6.00 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 53 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80380 Traffic Cone Each =================================================== MTCE 02-018 REGION 2 STRIPING 06/03/04 100.00 8.00 7.50 5.00 MTCE 06-044 R-6 SIGNAL INTERSECTIONS 06/17/04 200.00 9.00 4.08 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 500.00 9.20 5.01 4.20 MTCE 06-042 R6 - EXPANSION JOINT REPAIR 07/29/04 200.00 10.00 12.13 11.25 MTCE 01-040 I-25, NEAR LARKSPUR 07/29/04 150.00 11.00 11.67 10.00 MTCE 03-018 R-3 SIGN REPLACEMENT 07/29/04 100.00 10.00 9.75 7.00 MTCE 06-049 VARIOUS R-6 STRIPING 08/12/04 300.00 12.00 4.00 5.00 MTCE 06-046 I-70 & C-470 ALTERNATE PAVEME 08/19/04 200.00 10.00 14.68 14.20 MTCE 06-043R R-6, BRIDGE RAIL REPLACEMENT 08/26/04 200.00 10.00 12.00 12.00 MTCE 05-034R US 550, SOUTH OF DURANGO 09/02/04 200.00 10.00 3.75 1.00 MTCE 03-019R HWYS 70, 82, 50, 133, 141, 92 09/16/04 200.00 7.00 8.75 8.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,550.00 10.10 8.44 8.05 MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 100.00 10.00 12.13 16.00 MTCE 01-038 I-70 & SH 91 VMS/ SNOW GATES 10/28/04 150.00 10.00 8.37 5.25 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 250.00 10.00 9.62 9.55 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,000.00 9.98 8.90 7.78 =============== 630-80510 Mobile Pvmt Mkg Zone LUMP SUM =============================================== MTCE 04-050 R-4 EPOXY SH 34 EAST 03/11/04 1.00 5000.00 2000.00 1000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 5000.00 2000.00 1000.00 MTCE 04-048 FY 05 R 4 QUALITY EPOXY PAVEM 08/05/04 1.00 9000.00 10125.00 5000.00 MTCE 04-055 R-4 EPOXY EAST 08/05/04 1.00 5000.00 10625.00 2500.00 MTCE 04-054 R-4 EPOXY WEST 08/05/04 1.00 5000.00 6875.00 10000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3.00 6333.33 9208.33 5833.33 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 6000.00 7766.67 4625.00 =============== 630-80520 Mobile Pvmt Mkg Zone Day ==================================================== MTCE 02-015 REGION 2 STRIPING 02/05/04 50.00 150.00 283.33 250.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 50.00 150.00 283.33 250.00 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 54 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-80520 Mobile Pvmt Mkg Zone Day ==================================================== MTCE 02-018 REGION 2 STRIPING 06/03/04 75.00 250.00 231.25 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 75.00 250.00 231.25 300.00 MTCE 06-049 VARIOUS R-6 STRIPING 08/12/04 40.00 500.00 383.33 500.00 MTCE 06-046 I-70 & C-470 ALTERNATE PAVEME 08/19/04 8.00 500.00 468.75 240.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 48.00 500.00 393.38 476.36 MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 6.00 500.00 122.87 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6.00 500.00 122.87 110.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 179.00 297.49 272.99 323.54 =============== 630-85010 Impact Atten (Temp) Each =================================================== MTCE 06-043R R-6, BRIDGE RAIL REPLACEMENT 08/26/04 2.00 4000.00 4400.00 4800.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 4000.00 4400.00 4800.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 4000.00 4400.00 4800.00 =============== 630-85040 Impact Atten (T-M-A) (Temp) Each =================================================== MTCE 04-049 CONCRETE SLABS ON I-25 03/18/04 2.00 10000.00 29625.00 30000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 2.00 10000.00 29625.00 30000.00 MTCE 06-042 R6 - EXPANSION JOINT REPAIR 07/29/04 1.00 8000.00 8150.00 6300.00 MTCE 06-046 I-70 & C-470 ALTERNATE PAVEME 08/19/04 2.00 4000.00 3266.25 2365.00 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 55 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 630-85040 Impact Atten (T-M-A) (Temp) Each =================================================== MTCE 03-017 R-3, EXPANSION JOINT REPAIRS 08/19/04 2.00 6000.00 22166.67 27500.00 MTCE 06-043R R-6, BRIDGE RAIL REPLACEMENT 08/26/04 1.00 8000.00 4300.00 2600.00 MTCE 03-019R HWYS 70, 82, 50, 133, 141, 92 09/16/04 1.00 14000.00 13895.02 12800.00 MTCE 03-020R R3 EXPANSION JOINT REPAIRS ON 09/16/04 1.00 7100.00 8680.00 8680.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 8.00 7137.50 12202.06 12535.00 MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 1.00 4000.00 5995.20 9000.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 4000.00 5995.20 9000.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 11.00 7372.73 15496.98 15674.50