You are here: Home Business Center Design & Construction Project Support Materials and Geotechnical Manuals 2023 Field Material Manual - To be used on projects advertised between November 10, 2022 and June 30, 2023 Colorado Procedures (CP) Colorado Procedures-40s | Asphalt Colorado Procedures-40s | Asphalt https://www.codot.gov/business/designsupport/materials-and-geotechnical/manuals/2023-field-materials-manual/cps/cp-40s https://www.codot.gov/@@site-logo/siteLogo.png Colorado Procedures-40s | Asphalt CP-44 - Bulk Specific Gravity and Percent Relative Compaction of Compacted Bituminous Mixtures Using Saturated Surface-Dry Specimens CP-45 - Determining Percent of Particles with Two or More Fractured Faces
Colorado Procedures-40s | Asphalt https://www.codot.gov/business/designsupport/materials-and-geotechnical/manuals/2023-field-materials-manual/cps/cp-40s https://www.codot.gov/@@site-logo/siteLogo.png Colorado Procedures-40s | Asphalt CP-44 - Bulk Specific Gravity and Percent Relative Compaction of Compacted Bituminous Mixtures Using Saturated Surface-Dry Specimens CP-45 - Determining Percent of Particles with Two or More Fractured Faces
CP-44 - Bulk Specific Gravity and Percent Relative Compaction of Compacted Bituminous Mixtures Using Saturated Surface-Dry Specimens