Dispute Review Board Recommendations
For information only.
Region | Project Number and Description |
Subaccount |
Specification and Description |
Accepted/Rejected/Partial Acceptance |
1 |
NHPP_0703-445 |
21893 |
|
Rejected |
1 |
480V Motor Control Center replacement Eisenhower and Johnson Memorial Tunnel on I-70 |
21223R |
613.12 - Wiring payment |
|
1 |
Dispute No. 3 - North I-25 Segment 3 Express Lanes Project |
19626 |
CDOT Impacts to the Planned Earthwork |
Accepted |
1 |
Dispute No. 2 - 1-25 Managed Lanes, Segment 3 |
19626 |
108.03
|
Rejected by CDOT |
1 |
I-25 Express Lanes 120th - SH 7 |
19626 | 102.04 Interpretation of Plans and Specification | Accepted |
1 |
I-70 over Havana Bridge Replacement |
19339 |
Design/Build Maintenance issue |
Accepted |
1 |
I-70 Havana Bridge Replacement |
19339 | 105.03 Conformity to the Contract | Accepted |
1 |
Segment 4/5 |
18999 | 108.08 Failure to Complete Work on Time | Accepted |
1 |
I-25/C-470 Interchange Design |
18999 | 105.22(b) - Request for Equitable Adjustment | Accepted |
1 |
I-225 Parker to Mississippi Reconstruction |
17083 | Multiple Items | Accepted |
1 |
US-85 Titan to Cook Ranch |
14976 | 107.25 - Water Quality Control Liquidated Damages | Rejected by Contractor |
1 |
US-85 Titan to Cook Ranch
|
14976 | 108.03 - Schedule Liquidated Damages | Rejected by Contractor |
1 |
US-85 Titan to Cook Ranch |
14976 | 203 - Excavation and Embankment. Differing Site Conditions | |
1 |
I-25 Frontage Road Douglas County |
16025 | 412-13 - PCCP Joints and Dowel Placements | Accepted |
2 |
Project I-25 Ilex Design Build - Pueblo, CO |
19205 | Iron Phoenix Bridge delay | Rejected by Contractor |
2 |
US 50 McCulloch Blvd. to Wills. Blvd. Quantum |
19751 | 630 - Construction Zone Traffic Control - Night Time | Accepted |
2 |
I-25 Widening North of Colorado Springs |
18842 | Revision of Section 403 – Hot Mix Asphalt | Rejected by CDOT |
2 |
SH 350 Bridge Replacement |
18208 | 104.02 - Differing Site Conditions, Suspensions of Work, and Significant Changes in the Character of Work | Accepted |
2 |
I-25/US 24 Bridge Repairs |
18955 | 630 - Construction Zone Traffic Control | Accepted |
2 |
SH 96 Bridges |
17668 | 203 - Excavation and Embankment | Accepted |
2 |
SH 96 Bridges |
17668 | 625 - Construction Surveying | Accepted |
2 |
SH 96 Bridges |
17668 | 625 - Construction Surveying | Accepted |
2 |
SH 96 Bridges |
17668 | 625 - Construction Surveying | Accepted |
2 |
US 50 Hasty to McClave Jct |
18242 | 108.03 - Schedule Liquidated Damages | Accepted |
2 |
NB I-25 AT Missouri Creek |
18115 | 108.09 - Failure to Complete Work on Time | Rejected by Contractor |
2 |
C 021A-001 Improvements at Powers and Dublin |
17604 | 403 - Hot Mix Asphalt | Rejected by Contractor |
2 |
SH 16 / US 85 |
15915 | 206 - Excavation and Backfill for Structures | Accepted |
3 |
19470 |
108.03 Schedule |
Accepted | |
3 |
SH-135 Crested Butte South |
16446 | 700 - Materials Details | Accepted |
3 |
I-70 W. of Vail Wildlife Fence |
15903R | 203 - Excavating and Embankment. Differing Site Conditions | Accepted |
4 |
US 287 - SH 1 to LaPorte Bypass |
12372 | 108.08 & 108.09 | Rejected by Contractor |
4 |
US 36 Culvert Repair |
20610 | 109.04 Compensation for Changes & 109.10 Compensation for Compensable Delays | Accepted |
4 | FBR 0142-055 - SH 14 Bridge over Poudre River (MP 135.909) | 18085 | 104.02 - Differing Site Conditions | Accepted |
4 | STA 0072-010 Reconstruction Cherryvale Road to 75th Street. Quantum | 11873 | 104.02 - Differing Site Conditions, Suspension of Work (Utilities) |
Accepted
Accepted |
4 | STA 0072-010 Reconstruction SH 7 from Cherryvale Road to 75th Street | 11873 | 403 - Hot Mix Asphalt | Accepted |
4 | STA 0072-010 Reconstruction Cherryvale Road to 75th Street | 11873 | 104.02 - Differing Site Conditions, Suspension of Work | Rejected by Contractor |
4 | STA 0072-010 Reconstruction Cherryvale Road to 75th Street | 11873 | 108.09 - Failure to Complete Work on Time | Rejected portion (by Contractor) |
4 |
STA 0072-010 Reconstruction Cherryvale Road to 75th Street |
11873 | 104.02 - Differing Site Conditions, Suspension of Work | Accepted |
4 |
SH 66 Overlay Lyons to SH 287 |
16214 | 202.09 (rev.) Change condition regarding depth of removal of asphalt (planing). | Rejected by Contractor |
4 |
SH 66-US 36 to SH 287 |
16214 | 412 Portland Cement Concrete Pavement | Accepted |
4 |
SH 66 - US 36 to SH 287 |
16214 | 105.07 Conformity to Roadway Smoothness Criteria | Accepted |
4 |
I-25 Reconstruction |
12623 | 504 - Cribbing Plan or Spec Differing Interpretations | Accepted |
4 |
I-25 Reconstruction |
12623 | 601 - Structural Concrete Plan or Spec Differing Interpretations | Accepted |
4 |
I-25 Reconstruction |
12623 | 403 - Hot Mix Asphalt Materials Changes/Out of Spec. | Accepted |
4 |
I-25 Reconstruction |
12623 | 208 - Erosion Control Plan or Spec Differing Interpretations | Accepted |
4 |
I-25 Reconstruction |
12623 | 603 - Culverts and Sewers Plan or Spec Differing Interpretations | Accepted |
5 | 19780 | 104.02 - Differing Site Conditions | Rejected by CDOT | |
5 | NH 1601-062 Reconstruction US 160, Cortez |
18290 | 104.02 - Differing Site Conditions | Accepted |
5 |
SH 17 Reconstruction |
15176 | 105.05 - Conform to the Cost of Hot Mix Asphalt | Accepted |
5 |
US 160 4th Lane |
16042 | 105.03 - Conformity to the Contract Plan or Spec Differing Interpretations | Accepted |
1 |
SH 177 University Concrete Repair |
17734 | 108.09 - Failure to Complete Work on Time | Rejected by Contractor |
1 |
STA 0404-044 Colfax, 6th Ave. at I-70 | 15821R | 109.06 - Partial Payment AC and Fuel Cost Adjustments | Accepted |