You are here: Home Business Center Design & Construction Project Support Construction Specifications 2022 Construction Specifications Standard Special Provisions Revisions to Section 100 Revisions to Section 100 https://www.codot.gov/business/designsupport/cdot-construction-specifications/2022-construction-specifications/rev-ssp/rev-sec100-ssp https://www.codot.gov/@@site-logo/siteLogo.png Revisions to Section 100 Revision of Sections 101 and 106 - Buy America Requirements Revision of Sections 101 and 106 – Environmental Product Declarations Revision of Section 103 – Colorado Resident Bid Preference Revision of Section 103 – Escrow of Proposal Documentation Revision of Section 105 – Construction Drawings Revision of Section 105 - Control of Work Revision of Section 105 – Dispute Review Board and Claims for Unresolved Disputes Revision of Section 105 - Project First Program Revision of Sections 105 and 106 - Conformity to the Contract of Hot Mix Asphalt (voids acceptance) Revision of Section 106 - Buy America Requirements Non-Federal Aid Revision of Section 106 – Certificates of Compliance and Certified Test Report Revision of Section 106 - Conformity to the Contract of Hot Mix Asphalt (less than 5000 tons) Revision of Section 106 - Conformity to the Contract of Hot Mix Asphalt (less than 5000 tons with volumetric verification) Revision of Section 106 - Country of Origin Revision of Section 107 – Applicable Taxes Revision of Section 107 - Water Quality Control (under one acre of disturbance) Use on projects with an anticipated disturbance of less than one acre. Revision of Section 107 & 503 – Performance of Safety Critical Work and Submittals Revision of Section 108 – Liquidated Damages Revision of Section 109 - Asphalt Cement Cost Adjustment (asphalt cement included in the work) Revision of Section 109 - Asphalt Cement Cost Adjustment (asphalt cement paid separately) 1 2 Next 2 items
Revisions to Section 100 https://www.codot.gov/business/designsupport/cdot-construction-specifications/2022-construction-specifications/rev-ssp/rev-sec100-ssp https://www.codot.gov/@@site-logo/siteLogo.png Revisions to Section 100 Revision of Sections 101 and 106 - Buy America Requirements Revision of Sections 101 and 106 – Environmental Product Declarations Revision of Section 103 – Colorado Resident Bid Preference Revision of Section 103 – Escrow of Proposal Documentation Revision of Section 105 – Construction Drawings Revision of Section 105 - Control of Work Revision of Section 105 – Dispute Review Board and Claims for Unresolved Disputes Revision of Section 105 - Project First Program Revision of Sections 105 and 106 - Conformity to the Contract of Hot Mix Asphalt (voids acceptance) Revision of Section 106 - Buy America Requirements Non-Federal Aid Revision of Section 106 – Certificates of Compliance and Certified Test Report Revision of Section 106 - Conformity to the Contract of Hot Mix Asphalt (less than 5000 tons) Revision of Section 106 - Conformity to the Contract of Hot Mix Asphalt (less than 5000 tons with volumetric verification) Revision of Section 106 - Country of Origin Revision of Section 107 – Applicable Taxes Revision of Section 107 - Water Quality Control (under one acre of disturbance) Use on projects with an anticipated disturbance of less than one acre. Revision of Section 107 & 503 – Performance of Safety Critical Work and Submittals Revision of Section 108 – Liquidated Damages Revision of Section 109 - Asphalt Cement Cost Adjustment (asphalt cement included in the work) Revision of Section 109 - Asphalt Cement Cost Adjustment (asphalt cement paid separately) 1 2 Next 2 items
Revision of Section 106 - Conformity to the Contract of Hot Mix Asphalt (less than 5000 tons with volumetric verification)
Revision of Section 107 - Water Quality Control (under one acre of disturbance) Use on projects with an anticipated disturbance of less than one acre.