Specification Changes Under Consideration
Proposed New Standard Special Provisions |
|||
---|---|---|---|
Log No. |
Description |
Due Date for Comments |
|
105.20 - Contractor Engineers are reluctant to stamp "In-Kind" repairs on existing structures when damage occurs. Contractor have expressed concern over the ambiguity of who is liable for repairs that are performed. This is just clarifying what current practice already is. This is not intended to relieve them of responsibility of quality of work. |
August 16, 2022 |
||
Updating the Project First Specification to provide clarification on the workshop frequency and required tools. |
September 1, 2022 |
||
106-2-fy22 |
Upcoming revisions to 106.11, Buy America (CURRENTLY NO DRAFT SPEC) |
September 1, 2022 |
|
518-1-fy22 | Update CDOT Standard Specification 518.05 (a) from former requirements that were based on NCHRP Report 402, to current requirements outlined in AASHTO LRFD Bridge Construction Specification Appendix A19. | September 1, 2022 | |
601-1-fy22 | Class G has been difficult for projects outside the Denver area. Class DF was created as a substitute. Similar to Class G but with a slightly relaxed shrinkage requirement. | September 1, 2022 | |
718-1-fy 22 | Traceable Utilities - J Carter - As part of recently adopted legislation, C.R.S 9-1.5-101, all utility installations, including laterals (service lines) shall be traceable / locatable. CRS 9-1.5-103 (10) All new underground facilities, including laterals up to the structure or building being served, installed on or after August 8, 2018, must be electronically locatable when installed. As you'll note, this includes utility installations within CDOT rights-of-way. | September 1, 2022 | |
Proposed Revisions to Existing Standard Special Provisions |
|||
Log No. |
Description |
Due Date for Comments |
|
Proposed New Project Special Provision Worksheet |
|||
Log No. | Description | Due Dates for Comments | |
Proposed Revision to Existing Project Special Provision Worksheet |
|||
Log No. |
Description |
Due Dates for Comments |
|
Proposed New Pilot Project Special Provisions |
|||
Log No. |
Description |
Due Dates for Comments |
|
Proposed New Sample Project Special Provision |
|||
Log No. |
Description |
Due Dates for Comments |
|
Proposed Revised Sample Project Special Provision |
|||
Log No. |
Description |
Due Dates for Comments |
|
Comments and proposals for revising or creating new special provisions from concerned parties will be considered. CDOT personnel should direct these to their Specification Committee Region or Staff Branch Representative. Current Committee members are listed below. A completed Specification Revision Submittal Form is required by the Specifications Unit, which can be obtained by clicking here. Contractors who are members of Colorado Contractors Association (CCA) should direct their comments to Eldon Strong at CCA. Others not formally represented may address their comments directly to the CDOT Standards and Specifications Unit at the address indicated below.
Chairman: Neil Lacey (Project Development Branch Manager)
Secretary: Shawn Yu (Standards & Specifications Unit Leader)
Region Representatives:
- Region 1: Telecia McCline
- Region 1: Jason Lucerna
- Region 2: Jennifer Billings
- Region 3: Jarrett Spegele
- Region 4: Chris Boespflug
- Region 5: David Valentinelli
Staff Representatives:
- Project Development: Neil Lacey
- Specifications: Shawn Yu and Michele Kayen
- Area Engineers: Laura Zamora, Daniel Fisher, and Kevin Ryburn
- Bridge Branch: Hoang Bui
- Contracts & Market Analysis: Markos Atamo
- Materials Branch: Mike Stanford and Craig Wieden
- Traffic Engineering: Manjari Bhat and Nathan Rivera
- Maintenance: Tyler Weldon
- FHWA: Kelly Galardi
- Attorney General Office: Leo Milan
Others Receiving Drafts for Comment:
- Colorado Contractors Association (CCA): Jim Moody
Technical Committees:
- Bridge
- PDAC
- Drainage Advisory Committee (DAC)
- Water Quality Advisory Committee (WQAC)
- Joint Co-op, CDOT/CCA
CDOT STANDARDS AND SPECIFICATIONS UNIT:
- Shawn Yu
CDOT Standards and Specifications Unit Manager
2829 W. Howard Pl., 3rd fl.
Denver, CO 80204
Telephone: 303-757-9474