You are here: Home Business Center Design & Construction Project Support Construction Specifications 2011 Construction Specifications Recently Issued Special Provisions 2011-09-29 2011-09-29 https://codot.gov/business/designsupport/cdot-construction-specifications/2011-Specs/recently-issued-special-provisions/copy_of_2011-09-29 https://codot.gov/@@site-logo/siteLogo.png 2011-09-29 SSP Index 2011-09-29 Revision of Sections 105 and 106, Conformity to the Contract of Hot Mix Asphalt (Less Than 5000 Tons with Volumetric Verification) - Cover Letter Revision of Sections 105 and 106, Conformity to the Contract of Hot Mix Asphalt (Less Than 5000 Tons with Volumetric Verification) Revision of Section 109, Asphalt Cement Cost Adjustment (Asphalt Cement Included in the Work) - Cover Letter Revision of Section 109, Asphalt Cement Cost Adjustment (Asphalt Cement Included in the Work) Revision of Section 702, Hot Poured Joint and Crack Sealant - Cover Letter Revision of Section 702, Hot Poured Joint and Crack Sealant
2011-09-29 https://codot.gov/business/designsupport/cdot-construction-specifications/2011-Specs/recently-issued-special-provisions/copy_of_2011-09-29 https://codot.gov/@@site-logo/siteLogo.png 2011-09-29 SSP Index 2011-09-29 Revision of Sections 105 and 106, Conformity to the Contract of Hot Mix Asphalt (Less Than 5000 Tons with Volumetric Verification) - Cover Letter Revision of Sections 105 and 106, Conformity to the Contract of Hot Mix Asphalt (Less Than 5000 Tons with Volumetric Verification) Revision of Section 109, Asphalt Cement Cost Adjustment (Asphalt Cement Included in the Work) - Cover Letter Revision of Section 109, Asphalt Cement Cost Adjustment (Asphalt Cement Included in the Work) Revision of Section 702, Hot Poured Joint and Crack Sealant - Cover Letter Revision of Section 702, Hot Poured Joint and Crack Sealant
Revision of Sections 105 and 106, Conformity to the Contract of Hot Mix Asphalt (Less Than 5000 Tons with Volumetric Verification) - Cover Letter
Revision of Sections 105 and 106, Conformity to the Contract of Hot Mix Asphalt (Less Than 5000 Tons with Volumetric Verification)
Revision of Section 109, Asphalt Cement Cost Adjustment (Asphalt Cement Included in the Work) - Cover Letter