CADD Highway Engineering Design

CDOT OpenRoads Designer (ORD) and OpenBridge Modeler (OBM) 2024

Notice: Effective September 1, 2026, all new CDOT ProjectWise (PW) Projects will be using Bentley OpenRoads Designer (ORD) and OpenBridge Modeler (OBM) 2024 Versions of Software. All new ProjectWise (PW) projects will be created using the CDOT ORD-OBM 2024 workspace.  

It is important not to mix ORD software versions within a project to avoid any version issues and to ensure the project team is utilizing the correct ORD-OBM workspace. For this reason, the decision to upgrade a CDOT project to the OpenRoads Designer (ORD) or OpenBridge Modeler (OBM) 2024 will be made by the Project Manager and the Resident Engineer responsible for the project. However, the decision should include all project team members working with ORD. Once a decision has been made, all specialty group team members should know which version of ORD-OBM should be used on the specified project.

For those projects that are currently using the OpenRoads Designer 2022 R3 (ORD10.12) Release 3 (R3) and would like to upgrade to the Bentley OpenRoads Designer (ORD) and OpenBridge Modeler (OBM) 2024 version, the instructions on how to upgrade the project can be found below.


    2026 CDOT Digital Delivery & CADD Manual


    Workflow Documents & Resources

    CADD Training Resources

    Disclaimer - Notice of Disclaimer: The Colorado Department of Transportation (CDOT) makes these documents available on an "as is" basis. All warranties and representations of any kind with regard to said documents are disclaimed, including the implied warranties of merchantability and fitness for a particular use. Under no circumstances will the CDOT, or any of its officers or employees be liable for any consequential, incidental, special or exemplary damages even if apprised of the likelihood of such damages occurring. CDOT does not warrant the documents against deficiencies of any kind. The use of any of these documents for work which is under contract with CDOT, does not relieve the contractor from any obligations assumed by the contract, or from a complete and proper fulfillment of the terms of the contract, nor does it entitle the contractor to compensation for damages or loss which could be attributed to such use.