About the Program
Alternative Delivery Program has been created to provide owners the following:
- A better understanding of alternative project delivery methods (Design-Build, Construction Manager/General Contractor).
- Assistance in the evaluation and selection of alternative delivery methods for their projects using the
Project Delivery Selection Workshop Summary (Volume 24 Issue1) Template
- Assistance in managing their alternative delivery projects
Upcoming Alternative Delivery Contracting Projects
Design-Build
Construction Manager / General Contactor (CM/GC)
ICAC - Innovative Contracting Advisory Committee
Upcoming Alternative Delivery Contracting Projects
Title | Type |
---|---|
CM/GC Solicitations | Folder |
Design-Build Solicitations | Folder |
Upcoming Alternative Delivery Contracting Projects | Page |
Project Delivery Selection Matrix
Summary
Project Delivery Selection Matrix (PDSM) is a document that provides a formal approach for selecting project delivery methods for highway projects. The PDSM lists the project delivery methods followed by an outline of the process, instructions, and evaluation worksheets.
Upcoming Projects
Current Projects
- I-25 South GAP Project Monument to Castle Rock
- North I-25 Express Lanes Johnstown to Fort Collins
- North I-25 Phase II Berthoud to Johnstown
- US 550 MP 12.8 to Grand View Interchange
Past Projects
- C-470 Express Lanes Kipling to I-25
- Dotsero I-70 Frontage Rd over Colorado River
- Grand Ave
- I-25 and Arapahoe Interchange
- I-25 and Cimarron (US 24) Interchange
- I-25 Ilex Bridges
- I-25-Managed Lanes-120th- SH 7
- I-70 and Havana Bridge Replacement
- I-70 and Pecos Bridge Replacement
- I-70 Eagle
- I-70 Peak Period Shoulder Lane
- I-70 Vail Underpasses
- I-70G Edwards Spur Rd Phase 2
- SH 30 Bridge (F-17-GP) Replacement
- SH 92 Stengel's Hill
- Twin Tunnels
- Twin Tunnels WB Widening
- US 6 and Garrison St Bridge Replacement
- US 6 and Wadsworth Blvd
- US 34 Estas Park to Loveland
- US 34A Permanent Flood Repair
- US 50 Blue Creek and Sand Dome
- US 285 Lamar Reliever Route
Innovative Contracting Bulletins
The link address is: https://www.codot.gov/business/designsupport/bulletins_manuals/ic-bulletins
Alternative Delivery Program (Design-Build and CM/GC)
Manuals & Trainings
Manuals
- Construction Manager/General Contractor (CM/GC) January 2015
- CM/GC Manual Appendix January 2015
- CDOT Innovative Contracting Guidelines Revised January 2015
- 2016 CDOT Design-Build Manual September 2016
Standard & Project Special Provisions
Training
- ICAC - Innovative Contracting Advisory Committee (Meeting Minutes, Agendas, and other Information)
- Envirornmental Subcommittee (Includes the OMPD Best Practices manual)
- Highway and Bridge Construction Bidding
- Project Delivery Selection Matrix
- Owner-Controlled Insurance Program (OCIP)
- Introducing and Piloting Streamlined Design-Build (SDB) at CDOT
Best Practices/Lessons Learned
Design-Build |
CM/GC |
Active Alternative Delivery Projects - Project Websites
Region 1 - Metro Denver, Eastern-Central Colorado, and along I-70 up to the Eisenhower Tunnel
- C-470 Express Lanes (Design-Build) (In Construction phase, Flatiron)
- I-25 South Gap (CM/GC) (In Pre-Construction phase, Kraemer)
Region 4 - Northeast Colorado
- US 34 Big Thompson Canyon (CM/GC)(In Construction phase, Kiewit) - Make repairs caused by flooding.
- North I-25 Express Lanes: Johnstown to Fort Collins (Design-Build)(In Pre-Construction phase, Kraemer/IHC) - Add express lanes in both directions.
Region 5 - Southwest Colorado
- US 550/US 160 Connection (Design-Build)(In Procurement phase)
Completed Alternative Delivery Project Websites
Region 1 - Metro Denver, Eastern-Central Colorado, and along I-70 up to the Eisenhower Tunnel
- I-25 and Arapahoe Road Bridge Replacement (CM/GC)(Project completed, Kraemer)
- I-70 Peak Period Shoulder Lane Project (CM/GC) (Project completed, URS/Lawrence)
- Eisenhower/Johnson Tunnels Fixed Fire Suppression System (Design-Build) (Project completed, Barnard Construction)
- I-70 Twin Tunnels (CM/GC Delivery) - (Project completed, Kraemer and Obayashi JV)
- 1-70 Over Havana St. Design-Build Project (Design-Build) (Project completed)
- US 36 Express Lanes Project (Design-Build) (Project completed)
- US 6 Over Garrison Street (Streamlined Design-Build) (Project completed, Hamon Infrastructure selected as contractor)
- US 6 Bridge Replacements, Knox Court to just east of I-25 (Design-Build) (Project completed, FHU and Kraemer)
- Pecos Street over I-70 Bridge Replacement (CM/GC) (Project completed)
- US 85 (Santa Fe) over Dad Clark Gulch (Streamlined Design-Build) (Project completed)
Region 2 - Southeast Colorado
- I-25 North Design Build (Project completed, Kiewit)
- CO 266 & CO 71 Bridge Replacement North of Rocky Ford (CM/GC) (Project completed)
- I-25/Cimarron interchange in Colorado Springs (Design-Build) (Project completed, Kraemer and TSH)
Region 3 - Northwest Colorado
- I-70 Bridge Replacement in Dotsero (CM/GC) (Project completed)
- Grand Ave. Bridge in Glenwood Springs (CM/GC) (Project completed, Granite and RL Wadsworth)
- CO 92 Stengel's Hill, MP 13.8 to 15.5 - Bridge over railroad and roadway re-alignment.(Streamlined Design-Build)(Project completed, Wilson & Co./Hamilton Construction)
Construction Manager/General Contractor (CM/GC) Manual
CDOT is currently revising the Construction Manager/General Contractor (CM/GC) Manual to meet the State of Colorado Technical Standard TS-OEA-002 and House Bill 21-1110. In compliance with 8 CCR 1501-11, Section 11.11, to ensure this document is accessible to individuals with disabilities. The revised copy of the CM/GC Manual will be posted on our website as soon as it becomes available.
However, the previous version of the CM/GC Manual is available upon request. Please contact Sina Khavary at [email protected] for a PDF copy
Design - Build Manual
CDOT is currently revising the Design - Build Manual to meet the State of Colorado Technical Standard TS-OEA-002 and House Bill 21-1110. In compliance with 8 CCR 1501-11, Section 11.11, to ensure this document is accessible to individuals with disabilities. The revised copy of the Design – Build Manual will be posted on our website as soon as it becomes available.
However, the previous version of the Design - Build available upon request. Please contact Sina Khavary at [email protected] for a PDF copy