Letting Date | Project Description | Low Bidder | Bid Tabulation |
---|---|---|---|
December 21 |
NHPP 0705-089 (24905R) - This project is located in Region 4 in Kit Carson County. Project work consists of various roadway improvements on I-70 between Bethune and the Kansas State Line. |
Simon Contractors
|
Project 24905R Bid Tab |
December 21 |
STR 069A-035 (22338) - This project is located in Region 2 in Huerfano County. Project work consists of SH 69 shoulder widening and safety improvements from MP 10-30 including. |
Walsenburg Sand & Gravel
|
Project 22338 Bid Tab |
December 21 |
IM 0251-362 (25859) - This project is located in Region 2 in Pueblo County. Project work consists of resurfacing along I-25A from MP 92-102. Work includes 2.5” HMA mill and overlay, guardrail replacement, pavement markings, and delineation. |
Martin Marietta Materials Inc.
|
Project 25859 Bid Tab |
December 21 |
NHPP 1601-087 (24954) - This project is located in Region 5 in Archuleta, La Plata, and Montezuma Counties. Project work consists HMA mill and fill, chip sealing, replacing pavement markings and signs along US 160 from MP 56-81 and from MP 102-118. |
Intermountain Slurry Seal Inc.
|
Project 24954 Bid Tab |
December 21 |
STA 052A-055 (24199) - This project is located in Region 4 in Weld County. Project work consists of SH 52 Hudson East HMA overlay from MP 29-36 with shoulders improvements. |
Holcim- WCR Inc.
|
Project 24199 Bid Tab |
December 21 |
NHPP 0702-417 (24567R) - This project is located in Region 3 in Eagle and Summit Counties. Project work consists of an EB Auxiliary Lane MP 185-190, WB Curve Corrections MP 186 & 188, Shoulder Widenings MP 180-185, Vail Pass Truck Parking Area, SMSE Walls, Wildlife Underpasses, Wildlife Fencing, Avalanche Mitigation Fencing, Drainage Items, Closure System EB MP 180, ITS Backbone Relocation WB MP 185-190, ITS Improvements MP 185-190, Landscaping, and Mill and Overlay EB MP 179.5-185 outside lane. |
All Bids Rejected
|
N/A |
December 21 |
STM 0471-103 (25541) - This project is located in Region 2 in Pueblo County. Project work consists of micro surfacing on SH 47A from MP 0-3. |
Intermountain Slurry Seal Inc. |
Project 25541 Bid Tab |
December 14 |
NHPP 070A-037 (23583) - This project is located in Region 3 in Mesa County. Project work consists of reconstruction and realignment of I-70B, I-70Z, Main Street, Colorado Avenue, 2nd Street, and 3rd Street in the City of Grand Junction. |
All Bids Rejected |
N/A |
December 14 |
NHPP 0703-490 (24544) -This project is located in Region 3 in Summit County. Project work consists of I-70 Phase 2 improvements from Silverthorn to the EJMT (MP 206-214). |
Oldcastle SW Group, Inc. |
Project 24544 Bid Tab |
December 14 |
IM 0252-497 (23862) - This project is located in Region 2 in El Paso County. Project work consists of HMA resurfacing, bridge, culvert, and guardrail repairs on I-25A from MP 119-124. |
Martin Marietta Materials, Inc. |
Project 23862 Bid Tab |
December 14 |
MTCE R400-405 (26055) - This project is located in Region 4 in various counties. Project work consists of removal and replacement of thermoplastic pavement markings across the south east section of Region 4. |
Roadsafe Traffic Systems, Inc. |
Project 26055 Bid Tab |
December 14 |
STU 119A-071 (24171R) - This project is located in Region 4 in Boulder County. Project work consists of resurfacing and roadway widening on SH 119 from MP 22.750-25754. |
Zak Dirt, Inc. |
Project 24171R Bid Tab |
December 7 |
NH 0501-074 (23861) - This project is located in Region 2 in Chaffee and Fremont Counties. Project work consists of US 50A resurfacing from Coaldale to Salida. |
A&S Construction Co. |
Project 23861 Bid Tab |
December 7 |
C 5502-110 (23601) - This project is located in Region 5 in Ouray County. Project work consists of minor roadway widening for a passing lane and construction of a wildlife underpass with related improvements on US 550 from MP 109-117. |
FNF Construction, Inc. |
Project 23601 Bid Tab |
December 7 |
NH 0361-121 (20960) - This project is located in Region 4 in Larimer County. Project work consists of resurfacing on US 34 & US 36 near Estes Park including retaining wall, ADA and guardrail improvements. |
McAtee Construction Co. |
Project 20960 Bid Tab |
December 7 |
STM 016A-002 (25036) - This project is located in Region 4 in Logan County. Project work consists of HMA resurfacing on CO 61A from MP 32-41. |
McAtee Construction Co. |
Project 25036 Bid Tab |
December 7 |
STU SHE R100-392 (25441) - This project is located in Region 1 in Adams, Douglas and Jefferson Counties. Project work consists of guardrail safety improvements at various locations including US 285, I-25, US 6, SH 74, SH 86, and I-76. |
HCG Construction LLC |
Project 25441 Bid Tab |
December 7 |
C 0703-496 (24620) - This project is located in Region 1 in Denver and Jefferson Counties. Project work consists of noise wall reconstruction and guardrail replacement on I-70 from I-76 to Pecos. |
Hamon Infrastructure, Inc. |
Project 24620 Bid Tab |
December 7 |
IM 0251-357 (25093) - This project is located in Region 2 in Huerfano and Pueblo Counties. Project work consists of surface treatment on I-25 from MP 64 to MP 79.6. Work will include 2.5” mill and fill, guardrail replacement, and bridge preventative maintenance work on several major and minor structures. |
Martin Marietta Materials, Inc. |
Project 25093 Bid Tab |
November 30 |
NHPP 0821-116 (24678) - This project is located in Region 3 in Pitkin County. Project work consists of surface treatment along SH 82 from MP 26 and MP 33 to include 2” HMA planing, 2” HMA overlay, guardrail replacement, bridge work, curb and ramp replacement, pavement marking, and traffic control. |
Kilgore Companies LLC
|
Project 24678 Bid Tab |
November 30 |
C 0701-226 (20169) - This project is located in Region 3 in Garfield County. Project work consists of roundabout construction at exit 105 on I-70 at the US 6/Castle Valley Intersection. |
Johnson Construction Inc.
|
Project 20169 Bid Tab |
November 30 |
STA R500-216 (24425R) - This project is located in Region 5 in Archuleta, Costilla, and Mineral Counties. Project work consists of chain station improvements on US 160 and SH 17. |
Hank Williams, Inc. |
Project 24425R Bid Tab |
November 30 |
MTCE 072A-050 (25873R) - This project is located in Region 4 in Boulder County. Project works consists of SH 72B chip seal from MP 45-54. |
A-1 Chipseal Company |
Project 25873R Bid Tab |
November 16 |
NHPP 0702-412 (24321R-ALT) - This project is located in Region 3 in Eagle County. Project work consists of wall replacement along westbound I-70 at MP 170.5. |
Siete, Inc. |
Project 24321R-ALT Bid Tab |
November 16 |
FSA 025A-051 (25089) - This project is located in Region 2 in El Paso County. Project work consists of building a roundabout at the intersection of Baptist Road & Terrazzo Drive. Work also includes storm drains, lighting, HMA, earthwork, concrete island, truck apron, and curb and gutter. |
Native Sun Materials, Inc. |
Project 25089 Bid Tab |
November 9 |
C 145A-082 (24148) - This project is located in Region 5 in San Miguel County. Project works consists of wall replacement on SH 145 at MP 63.4. |
Hank Williams, Inc. |
Project 24148 Bid Tab |
November 9 |
STR R200-287 (25874) – This project is located in Region 2 in Las Animas and Pueblo Counties. Project work consists of a critical culvert repair on I-25 and SH 12. The repair will focus on lining (spray and slip), cleaning, extending, and repairing wing walls. |
Siete, Inc. | Project 25874 Bid Tab |
November 9 |
MTCE 0704-259 (26054) This project is located in Region 1 in Arapahoe County. Project work consists of concrete panel replacement on I 70 from MP 305 to MP 325. |
Ralph L. Wadsworth Construction Company, LLC |
Project 26054 Bid Tab |
November 2 |
STR 0131-069 (21901) - This project is located in Region 3 in Moffat and Routt Counties. Project work consists of resurfacing and minor rehabilitation on SH 13 from MP 64.17 to MP 79.10 and SH 317 from MP 0.00 to MP 12.24. |
Kilgore Companies LLC |
Project 21901 Bid Tab |
October 26 |
NHPP 0501-078 (24682) - This project is located in Region 3 in Delta and Montrose Counties. Project work consists of resurfacing of US 50 from MP77 to MP86. Work will include 1.5" HMA leveling course on US 50 from MP 76.86 to MP 81.65, a 2.0" HMA overlay on US 50 from MP 76.86 to MP 86.04, and a 2.0" mill and fill at the US 50 and SH 348 intersection. |
Oldcastle SW Group, Inc. |
Project 24682 Bid Tab |
October 26 |
STR0 65A-024 (24509) - This project is located in Region 3 in Mesa County. Project works consists of SH65 chip seal from MP48 to MP61 as well as SH 330 from MP0 to MP11. Work consists of Type I (3/8 -inch) cover coat material, fog coat, pavement markings, and traffic control. |
Oldcastle SW Group, Inc. |
Project 24509 Bid Tab |
October 26 |
NHPP 1601-075 (20685) - This project is located in Region 5 in Montezuma County. Project works consists of US 160 Scour Repairs. |
Meridian Contracting, Inc. |
Project 20685 Bid Tab |
October 26 |
STA 0242-096 (25293) - This project is located in Region 2 in Teller County. Project work consists replacement of signals and curb ramps along US 24 as well as signing and striping at 3 intersections. |
All Bids Rejected |
N/A |
October 26 |
C R100-378 (24902) - This project is located in Region 1 in Arapahoe County. Project work consists of signal system and communication upgrades along US 285. |
Lighthouse Transportation Group, Inc. |
Project 24902 Bid Tab |
October 19 |
NHPP 0402-105 (24680) - This project is located in Region 3 in Routt County. Project work consists of PCCP Rehab along US 40 between MP 130.5 and MP 133.5. Work includes slab repairs, routing and sealing, traffic control, ADA curb ramp repairs, pavement marking, and replacement of damaged curbs and gutters. |
KSK, LLC |
Project 24680 Bid Tab |
October 19 |
FSA 050A-032 (21630) - This project is located in Region 2 in Fremont County. Project work consists of building a roundabout at the intersection of the US50 offramp and SH115. Work will also include lighting, HMA, earthwork, concrete island and truck apron, and curb and gutter for roundabout. |
Concrete Concepts Design Inc. |
Project 21630 Bid Tab |
October 19 |
STM M240-178 (23115R) - This project is located in Region 2 in El Paso County. Project work consists of replacement of curb ramps and pedestrian push buttons at various locations to bring ramps into ADA compliance. |
KSK, LLC |
Project 23115R Bid Tab |
October 19 |
MTCE R200-286 (25817) - This project is located in Region 2 in El Paso, Las Animas and Pueblo Counties. Project work consists of pavement marking on various highways/locations. |
Roadsafe Traffic Systems, Inc. |
Project 25817 Bid Tab |
October 12 |
NHPP 0405-041 (24416) This project is located in Region 4 in Lincoln County. Project work consists of intersection improvements on US 40 from MP399.05 to MP 399.15. Work will include widening the south side of the intersection with concrete pavement with inlet, sidewalk, curb and gutter, and curb ramp improvements. |
TLM Constructors, Inc. |
Project 24416 Bid Tab |
October 12 |
NHPP 1211-101 (24622) This project is located in Region 1 in Jefferson County. Project work consists of ramp and frontage road improvements on US6 and Wadsworth Blvd. Work will include construction of an auxiliary lane and sound wall, as well as drainage improvements. |
Kraemer North America, LLC |
Project 24622 Bid Tab |
October 5 |
MTCE1191-042 (26050) - This project is located in Region 4 in Boulder County. Project work consists of installation of shoulder rumble strips and permanent signing installation on SH119 from Boulder to Longmont. SH119. Work will include traffic control and sweeping. |
Kraemer North America, LLC
|
Project 26050 Bid Tab |
September 28 |
267 0831-129 (25311R) This project is located in Region 1 in Arapahoe County. Project work consists of bottleneck mitigation at the interchange of SH83 And SH88 primarily consisting of modifications to the eastbound outside curb line, and changes to the signing and striping. Work will also include minor signal modifications. |
Techcon Infrastructure, LLC |
Project 25311R Bid Tab |
September 28 |
BR R400-397 (25124) This project is located in Region 4 in Elbert, Logan, and Sedgwick Counties. Project work consists of Stringer repairs on 13 structures throughout Region 4. |
Structures, Inc. |
Project 25124 Bid Tab |
September 21 |
FSA 0703-476 (23772) This project is located in Region 1 in Jefferson County. Project work consists of reconstruction of the existing emergency escape ramp at Mt. Vernon on the EB side on I-70 at MP257 along with installation of signing and its items west of the emergency escape ramp. |
Structures, Inc. |
Project 23772 Bid Tab |
September 14 |
ITS 070A-041 (25202) - This project is located in Region 1 in Garfield, Mesa, and Routt Counties. Project work consists of ITS Fiber Optic Laterals along I-70 from Grand Junction to Glenwood Springs.
|
Paonia Inc.
|
Project 25202 Bid Tab |
September 7 |
C 0063-061 (22907R A/B/C) This project is located in Region 3 in Mesa County. Project work consists of traffic signal work on US6B in Grand Junction. Award of the project is for the A Schedule. |
Morton Electric, Inc. |
Project 22907 Bid Tab |
August 31 |
NH 050A-030 (20912) - This project is located in Region 2 in Otero County. Project work consists of US50B drainage improvements between MP374 and MP 376. Work includes modifying an irrigation box and multiple culverts underneath access roads, and replacement of an elliptical pipe that runs across US50B with a 3x6 pre-cast concrete box. |
Habitat Construction, LLC |
Project 20912 Bid Tab |
August 17 |
FSA 392A-021 (25463) - This project is located in Region 4 in Weld County. Project work consists of safety improvements on CO 392B from MP 109.26 to MP121.59. |
Mountain Constructors, Inc. |
|
August 11 |
FBR 151A-012 (25737) - This project is located in Region 5 in Archuleta County. Project work consists of an emergency culvert replacement on CO 151. |
American West Construction, LLC. |
|
August 10 |
MTCE 072A-050 (25873) - This project is located in Region 4 in Boulder County. Project works consists of SH72B chip seal from MP45 to MP54. |
No Bids Received |
N/A |
August 10 |
MTCE R200-285 (25668) - This project is located in Region 2 in various counties. Project work consists of removal and replacement of signs along US 50 between Pueblo and Penrose in Fremont and Pueblo counties, along US 160 between La Veta Pass and Walsenburg in Huerfano County, along US 160 between Branson & Kim in Las Animas County, between Sheridan Lake and Kansas state line in Kiowa County, and Highways 45, 50C, 78, 96 & 165 in Custer and Pueblo counties. |
Work Zone Traffic Control, LLC |
Project 25668 Bid Tab |
July 27 |
MTCE 0702-432 (25855)- This project is located in Region 3 in Summit County. Project work consists of I-70 eastbound resurfacing from MP190 to MP203. |
Kilgore Companies LLC |
Project 25855 Bid Tab |
July 27 |
NHPP R100-395 (25478)- This project is located in Region 1 in Adams County. Project work consists of bridge preventative maintenance along I-270. Work will also include: bridge deck repairs, removal of any loose concrete and placement of concrete overlay, milling of asphalt near bridge ends and placement of new HMA, and concrete girders repair. |
Kiewit Infrastructure Co. |
Project 25478 Bid Tab |
July 27 |
STM 0252-484 (22827)- This project is located in Region 2 in El Paso County. Project work consists of operational improvements along I-25 from Fillmore to Garden of the Gods. Work will include constructing continuous auxiliary lanes in both directions of I-25 between exits 145 and 146, reconstructing and widening the Ellston Street overpass structures, joint repair on the GOTG overpass structures, roadway resurfacing, curve cross slope corrections, drainage and water quality upgrades, ITS infrastructure replacements, and ramp metering modifications. |
SEMA Construction, Inc. |
Project 22827 Bid Tab |
July 20 |
STA R400-399 (25276R)- This project is located in Region 4 in Boulder, Cheyenne, Larimer, Morgan, Washington, Weld, and Yuma counties. Project work consists of work on the highway mainline, and consists of Removing and replacing existing epoxy pavement markings, Installing center line rumble strips by grinding and associated temporary pavement markings, and Installing edge line rumble strips by grinding. |
Surface Preparation Technologies, LLC |
Project 25276R Bid Tab |
July 20 |
C R400-393 (24885)- This project is located in Region 4 in Boulder County. Project work consists of signal pole replacement and curb ramp improvements on US 287 at 11th Ave and 19th Ave. |
Sturgeon Electric Company |
Project 24885 Bid Tab |
July 20 |
MTCE R300-274 (25279)- This project is located in Region 3 in Eagle, Garfield, and Pitkin Counties. Project work consists of stencil maintenance on HWY 82 from mile marker 0.0 to 39.72, and HWY 133 from 66.61 to 68.82. |
American Striping Company, LLC |
Project 25279 Bid Tab |
July 13 |
STA 0253-293 (24887) - This project is located in Region 4 in Larimer County. Project work consists of concrete panel replacement, diamond grinding, erosion control, temporary traffic control, and striping on I-25 north of Ft. Collins. |
Castle Rock Construction Company of Colorado, LLC |
Project 24887 Bid Tab |
July 6 |
FSA C020-051 (25317) - This project is located in Region 2 in Pueblo County. Project work consists of intersection safety improvements, minor widening, and installation of ICWS at the intersection of US 50 and CO 231. |
Morton Electric, Inc. |
Project 25317 Bid Tab |
July 6 |
NH M240-213 (25663) - This project is located in Region 2 in El Paso County. Project work consists of US24 Pedestrian Safety Improvements. Work will include concrete work at intersections, turn lane curb work, crosswalks, pedestrian push buttons and signal heads, and other safety improvements. |
Rodriguez Construction ORG LLC |
Project 25663 Bid Tab |
June 22 |
FSA 0852-125 (25263) - This project is located in Region 1 in Douglas County. Project work consists of a temporary traffic signal installation and utilities relocation at the intersection of US85 and Daniels Park Road. |
Morton Electric, Inc. |
Project 25263 Bid Tab |
June 22 |
267 0831-129 (25311) - This project is located in Region 1 in Arapahoe County. Project work consists of bottleneck mitigation at the interchange of SH83 And SH88 primarily consisting of modifications to the eastbound outside curb line, and changes to the signing and striping. Work will also include minor signal modifications. |
No Bids Received |
N/A |
June 22 |
SHE 030A-041 (24394) - This project is located in Region 1 in Arapahoe County. Project work consists of minor widening for a turn lane at SH30 and E. Hampden Ave. The work includes earthwork, ABC, HMA, drainage, signal modifications, temporary erosion control, stripping and seeding. |
Rodriguez Construction Org., LLC. |
Project 24394 Bid Tab |
June 15 |
MTCER400-403 (25708) - This project is located in Region 4 in various counties. Project work consists of removal and replacement of modified epoxy pavement markings on various highways across the region. |
Streamline Markings, Inc. |
Project 25708 Bid Tab |
June 9 |
APR 102-2023 - This is a Region 1 Invitation for Bids for on call asphalt paving services under a master task order contracting process. |
Brannan Sand and Gravel, LLC |
Asphalt Paving Bid Tab |
June 8 |
NHPP 0703-505 (24884) - This project is located in Region 1 in Clear Creek County. Project work consists of I-70 eastbound resurfacing from EJMT (MP 215.7) to Georgetown (MP 228.4) as well as replace and install new guardrails. |
Oldcastle SW Group, Inc. |
Project 24884 Bid Tab |
June 8 |
STMM 240-178 (23115) - This project is located in Region 2 in El Paso County. Project work consists of replacement of curb ramps and pedestrian push buttons at various locations to bring ramps into ADA compliance. |
All Bids Rejected |
N/A |
May 25 |
STA R400-399 (25276)- This project is located in Region 4 in various counties. Project work consists of replacement of epoxy pavement markings and installation of centerline rumble strips at various locations. |
No Bids Received |
N/A |
May 25 |
FSA 0761-240 (24036)- This project is located in Region 4 in Morgan County. Project work consists of installation of high-tension cable barrier TL-3 and concrete mow strip on I-76 from MP 72 to MP 91.1. |
IHC Scott, Inc. |
Project 24036 Bid Tab |
May 18 |
SHE 0881-035 (24535) - This project is located in Region 1 in Arapahoe County. Project work consists of installation of raised median, curb ramp improvements, and traffic signals on SH88 from MP 7.9 to MP 8.223. |
Goodland Construction, Inc. |
Project 24535 Bid Tab |
May 17 |
NHPP 0403-068 (25714) - This project is located in Region 3 in Clear Creek and Grand Counties. Project work consists of the emergency repairs on US 40 Berthoud Pass West resurfacing. |
Oldcastle SW Group, Inc. |
Project 25714 Bid Tab |
May 16 |
C 133A-057 (25789) -This project is located in Region 3 in Gunnison County. Project work consists of the emergency repairs on SH 133 Temporary Bridge-Culvert replacement. |
Ralph L. Wadsworth Construction Company, LLC |
Project 25789 Bid Tab |
May 11 |
SHE 0702-405 (24015)- This project is located in Region 3 in Eagle County. Project work consists of installation of 18 variable speed limit signs, one roadway weather information system, 7 MVRDs, bored and trenched electrical conduit for fiber and electric, 85 pullboxes, wiring, fiber, guardrail and end anchors, and erosion control along I-70 from MP 169 to MP 173. |
Lumin8 Transportation Technologies, LLC |
Project 24015 Bid Tab |
May 11 |
SHE 0831-128 (25295) - This project is located in Region 1 in Douglas, El Paso, and Jefferson Counties. Project work consists of installation of rumble strips on SH83 and US 285. |
Surface Preparation Technologies, LLC |
Project 25295 Bid Tab |
May 11 |
C 133A-055 (24599) - This project is located in Region 3 in Gunnison County. Project work consists of slope stabilization along SH133 from MP21 to MP31.5. |
Hank Williams, Inc. |
Project 24599 Bid Tab |
April 27 |
STM R200-275 (24672S) - This project is located in Region 2 in Pueblo County. Project work consists of intersection safety improvements. The work will include, but is not limited to, replacement and installation of ADA curb ramps, crosswalk work, and replacement of existing curb & gutters as well as sidewalks. |
Morton Electric, Inc. |
Project 24672S Bid Tab |
April 20 |
NHPP 0702-417 (24567) - This project is located in Region 3 in Eagle and Summit Counties. Project work consists of construction of a third lane along I-70 MP 179-192. |
All Bids Rejected |
N/A |
April 17 | ER 4701-140 (25672) - This Project is located in Region 1 in Jefferson County. Project work consists of emergency drainage repairs at C470 and Platte Canyon Road. |
Kraemer North America, LLC |
Project 25672 Bid Tab |
April 14 | FBR 061A-003 (25447) - CMGC CAP Region 4 Eastern Plains Timber Bridge Replacement. |
Lawrence Construction Company |
Project 25447 Bid Tab |
April 13 |
STA 2854-155 (25354) - This project is located in Region 2 in Park County. Project work consists of reconstruction of median, installations of guardrails and other safety improvements along US285. |
Native Sun Materials, Inc. |
Project 25354 Bid Tab |
March 30 |
STA 257A-008 (23423) - This project is located in Region 4 in Weld County. Project work consists of 4.7 miles of asphalt resurfacing with various treatments on CO 257, and Class 2 & 3 bridge rehabilitation work will be completed on structure C-17-CZ. |
Coulson Excavating Company, Inc. |
Project 23423 Bid Tab |
March 30 |
NHPP R100-376 (24881) - This project is located in Region 1 in Jefferson County. Project work consists of retaining wall reconstruction and guardrail improvements at various locations. |
Harrison Western Construction Corporation |
Project 24881 Bid Tab |
March 30 |
NHPP 0705-089 (24905) - This project is located in Region 4 in Kit Carson County. Project work consists of resurfacing the westbound lanes of I-70 with a hot mix asphalt overlay, and other improvements from Burlington to the Kansas State line. |
All Bids Rejected |
N/A |
March 30 |
ER 0703-524 (25670) - This project is located in Region 1 in Clear Creek County. Project work consists of emergency bridge deck repairs to structure F-13-P on I-70 EB east of the Eisenhower Johnson Memorial Tunnels. |
Structures, Inc. |
Project 25670 Bid Tab |
March 16 |
MTCE R300-276 (25444) - This project is located in Region 3 in Eagle, Garfield, Grand, and Summit Counties. Project work consists of grinding existing pavement markings and refreshing with inlaid, 4 to 8 inch wide, modified epoxy pavement marking material on the following roadways: I-70, US-40, US-6F, CO-9C, CO-9D, and other highways. |
Roadsafe Traffic Systems, Inc. |
Project 25444 Bid Tab |
March 16 |
FBR 0703-520 (25280) - This project is located in Region 1 in Clear Creek and Summit Counties. Project work consists of Eisenhower Johnson Memorial Tunnel plenum liner consolidation grouting work. |
Engineering & Construction Innovations |
Project 25280 Bid Tab |
March 16 |
FSA 070A-039 (24417R) - This project is located in Region 1 in Jefferson County. Project work consists of implementing safety improvements along I-70 between Genesee MP 253 and Colfax Ave MP 262. |
No Bids Received |
N/A |
March 16 |
STA R500-216 (24425) - This project is located in Region 5 in Archuleta, Costilla, and Mineral Counties. Project work consists of chain station improvements on US 160 and SH 17. |
All Bids Rejected |
N/A |
March 9 |
STR 194A-002 (24198) - This project is located in Region 2 in Bent and Otero Counties. Project work consists of leveling and overlay work on SH 194 from MP 10.1 to MP 19.5. |
Oldcastle SW Group, Inc. |
Project 24198 Bid Tab |
March 2 |
NHPP 0253-290 (24658) - This project is located in Region 1 in Adams County. Project work consists of bridge preventative maintenance on I-25 from MP 215.5 to MP 215.7. |
ABCO Contracting, Inc. |
Project 24658 Bid Tab |
March 2 |
SHE 067A-044 (22242) - This project is located in Region 2 in Douglas and Teller Counties. Project work consists of safety improvements at two locations on SH 67. |
Native Sun Materials |
Project 22242 Bid Tab |
March 2 |
STR R300-265 (24167) - This project is located in Region 3 in Grand and Jackson Counties. Project work consists of crack sealing both stretches of Highway 14 from MP 34.7 to MP 64.9 and MP 165 to MP 178 and on US 40 from MP 165 to MP 178. |
Scodeller Construction, Inc. |
Project 24167 Bid Tab |
February 16 |
C 0703-498 (24667) - This project is located in Region 1 in Clear Creek and Summit Counties. Project work consists of various improvements for the Service Area at the Eisenhower Johnson Memorial Tunnel. |
American West Construction, LLC |
Project 24667 Bid Tab |
February 16 |
STA 1381-011 (22465) - This project is located in Region 4 in Logan County. Project work consists of widening and overlying of SH 138 between Sterling and Iliff. |
Mcatee Construction Co. |
Project 22465 Bid Tab |
February 16 |
C 133A-052 (24279) - This project is located in Region 3 in Pitkin County. Project work consists of rockfall mitigation at four sites on SH133. Rockfall mitigation will include rock scaling and stabilization, rock and unclassified excavation, rockfall wire mesh installation, and a debris flow barrier. |
Meridian Contracting, Inc. |
Project 24279 Bid Tab |
February 16 |
C 1601-084 (23191) - This project is located in Region 5 in Archuleta, La Plata, Mineral, Montezuma, and Rio Grande Counties. Project work consists of replacing three existing culvert structures and repair six culvert inverts along US 160 from MM 49.48 to 184.65. |
American West Construction, LLC |
Project 23191 Bid Tab |
February 16 |
C 1601-086 (24772) - This project is located in Region 5 in Montezuma County. Project work consists of signal replacements on US 160 at CO 145 and US 160 at Chestnut in Cortez as well as curb ramp work on CO 145. |
Bixby Electric, Inc. |
Project 24772 Bid Tab |
February 16 |
STM C440-013 (23064) - This project is located in Region 3 in Eagle County. Project work consists of ADA curb ramp improvements at various locations. Award of the project is for the C Schedule. |
KSK, LLC |
Project 23064 Bid Tab |
February 16 |
NHPP 0701-256 (25120) - This project is located in Region 3 in Mesa County. Project work consists of traffic safety improvements for lengthening the existing westbound left turn lane on I 70B, installing three pedestrian push buttons on three of the four corner ramps, installing a signal pedestrian pole, removal of the existing pedestrian head and signal cameras, and installing new detection system cameras. |
Oldcastle SW Group, Inc. |
Project 25120 Bid Tab |
February 16 |
C 0881-036 (24878) - This project is located in Region 1 in Arapahoe, Denver, and Jefferson Counties. Project works consists of replacing approximately 207 curb ramps to comply with Federal ADA standards. |
KSK, LLC |
Project 24878 Bid Tab |
February 7 |
NHPP 0253-296 (25166) - CMGC CAP Construction Package 7 in Region 4 I-25 Express Lanes Segment 5&6. |
RLW/SEMA, A Joint Venture |
Project 25166 Bid Tab |
February 2 |
C 0063-061 (22907A/B/C) - This project is located in Region 3 in Mesa County. Project work consists of traffic signal work on US6B in Grand Junction. |
No Bids Received |
N/A |
February 2 |
C 0342-066 (24795) - This project is located in Region 4 in Morgan and Weld Counties. Project work consists of installation of two new CCTV cameras and one new RWIS along US 34 between Greeley and Wiggins. |
Lumin8 Transportation Technologies, LLC |
Project 24795 Bid Tab |
January 26 |
FSA 0853-123 (24032) - This project is located in Region 4 in Weld County. Project work consists of median installations north and southbound left-turn acceleration lanes along US85 at the intersection of WCRR66. |
Coulson Excavating Company, Inc. |
Project 24032 Bid Tab |
January 26 |
NHPP R100-383 (25151) - This project is located in Region 1 in Denver County. Project work consists of I-70 over Washington Bridge repairs. |
ABCO Contracting, Inc. |
Project 25151 Bid Tab |
January 26 |
STA 066A-008 (21657) - This project is located in Region 4 in Weld County. Project work consists of SH66 at WCR7 and WCR13 Intersection Improvements. |
Brannan Sand and Gravel, LLC |
Project 21657 Bid Tab |
January 19 |
SFTY R200-277 (24935R) - This project is located in Region 2 in El Paso, Fremont, Huerfano, Kiowa, Las Animas, and Pueblo Counties. Project work consists of replacing and installing new guardrail end terminals on various highways within the counties listed. |
CC Enterprises - Traffic Control Specialists, Inc. |
Project 24935R Bid Tab |
January 12 |
STA 172A-022 (24092) - This project is located in Region 5 in La Plata County. Project work consists of SH 172 surface treatment, ADA improvements, culvert improvements, and traffic safety improvements. |
Oldcastle SW Group, Inc. |
Project 24092 Bid Tab |
January 12 |
NHPP 0701-250 (23475 A) - This project is located in Region 3 in Mesa County. Project work consists of resurfacing I-70B and SH141B. Award of the project is for the A Schedule. |
Kilgore Companies, LLC |
Project 23475A Bid Tab |
January 12 |
STR 2871-040 (23698) - This project is located in Region 2 in Baca County. Project work consists of removal and replacement of full concrete panels. |
Castle Rock Construction Co. |
Project 23698 Bid Tab |
January 5 |
STU 119A-071 (24171) - This project is located in Region 4 in Boulder County. Project work consists of resurfacing and roadway widening of SH119. |
No Bids Received |
N/A |
January 5 |
MTCE R500-221 (24955) - This project is located in Region 5 in Chaffee, La Plata, and Mineral Counties. Project work consists of region wide striping at various locations. |
Straight Stripe Painting, Inc. |
Project 24955 Bid Tab |
January 5 |
NHPP 0702-412 (24321-ALT) - This project is located in Region 3 in Eagle County. Project work consists of replacement of the wall along westbound I-70 at MP 170.5. |
All Bids Rejected |
N/A |