Jan 14 | BR 0704-233 (19497) ~ On I-70: Bridge Rehabilitation and Scour Mitigation at 2 locations west of Deer Trail, Colorado with bridge pier repairs, bridge deck removal and replacement, HMA, grading, erosion control, rock riprap, TRM, and seeding in Arapahoe County | Hamilton Construction Co. | Bid Tab |
Jan 14 | BR 231A-001 (19425) ~ On SH231 bridge repair on structure over Arkansas River in Pueblo County | American Civil Constructors | Bid Tab |
Oct 28 | C 0061-088 (21609) ~ Emergency repairs on US6 C-23-AV, minor structure replacement in Logan County | Zak Dirt | Bid Tab |
May 12 |
C 0702-304 (17778) ~ On I-70, approximately MP 131-140 (Dotsero to Gypsum) and MP 165.8-171.4 (Avon to Dowd Canyon), installation of deer fence and repair of existing deer fence, game ramp installation and traffic control in Eagle County |
Rejected | N/A |
Sept 1 |
C 0702-304 (17778R) ~ On I-70, ~ MP 131-140 (Dotsero to Gypsum) and MP 165.8-171.4 (Avon to Down Canyon), installation of deer fence and game ramp, repair to deer fence and traffic control in Eagle County |
Kirkland Construction | Bid Tab |
Feb 11 |
C R500-154 (19791) ~ On US160 MP 136.61 culvert replacement, 0.50 mile in Archuleta County |
American West Construction | Bid Tab |
Dec 1 |
ER 052A-043 (21443) ~ On SH 52, MP 87.225 - 87.450, permanent repair to storm drain: pipe replacement, shoring, inlets, HMA pavement, manholes, seeding & mulching, excavation, de-watering in Fort Morgan County |
Zak Dirt Inc. | Bid Tab |
Dec 15 |
ER 0061-085 (20255) ~ On US6 in Sterling, removal of asphalt mat, base course placement, concrete pavement, curb, gutter and sidewalk work, bridge deck repair, waterproofing membrane, joint repair, pier and abutment scour repairs, storm drainage improvements, signing, striping, seeding, wetland restoration and traffic control in Logan County |
Castle Rock Construction Company of Colorado | Bid Tab |
Aug 18 |
ER 066A-006 (20246) ~ On SH66B MP 46.47-47.15, Final overlay of 0.38 miles of SH 66 damaged during the flood, along with roadside ditch improvements which include culvert replacement, rip rap placement on river banks, and wetland plantings in Weld County |
Zak Dirt Inc. | Bid Tab |
Mar 24 |
ER 007A-022 (20229) ~ On SH7 from Estes Part to SH72, resuracing and select reconstruction in Boulder and Larimer Counties |
American Civil Constructors, LLC dba ACC Mountain West | Bid Tab |
Feb 11 |
ER 072A-039 (20261) ~ On SH72B, MP 32.6-54.064, permanent flood repair resurfacing with some earth work in Boulder County |
APC Construction Co. | Bid Tab |
Jul 06 |
ER 0341-088 (21325) ~ CMGC CAP Award |
Kiewit Infrastructure Co. | Bid Tab |
Oct 13 |
FBR 090A-007 (20817) ~ ALTERNATE PROJECT On SH 90 MP 15.216 near Bedrock, Colorado: removal and replacement of existing K-01-C bridge with a new bridge (K-01-L) on the same alignment in Montrose County |
SEMA Construction | Bid Tab |
May 5 |
FSA 0403-060 (20815) ~ On US40 in the town of Empire, construction of median island traffic calming devices and traffic control management in Clear Creek County |
KECI Colorado | Bid Tab |
Aug 4 |
FSA 0703-438 (21310) ~ I-70 EB over Garrison Street, Bridge E-16-GU widening, partial sound wall reconstruction, removal of guardrail Type 7, PCCP dowel bar retrofits, PCCP soulder pavement, light standard and drainage inlet relocation, and overhead sign structure replacements in Jefferson County |
Hamilton Construction | Bid Tab |
Aug 4 |
FSA 0761-216 (19085) ~ On I-76 between US-85 and 96th Ave. exits: safety project to correct geometry & superelevation, to provide 2 lane transition from SB US-85; a resurfacing project to replace damaged concrete pavement with embankment material, base course, HMA, concrete pavement, drainage improvements, ITS fiber optic line relocation, guardrail, detour pavement, temporary concrete barrier, traffic control, erosion control, signing and striping in Adams County |
VIllalobos Concrete |
Bid Tab |
Jul 14 |
FSA 0853-091 (19185) ~ At US85 & SH392, intersection/interchange improvements in Weld County |
SEMA Construction | Bid Tab |
Jun 16 |
FSA 085A-018 (20779)~ On US85 from SH7 to Bromley Lane with unclassified excavation, removal of fence, placement of guardrail type 7, curb and gutter, electical conduit, fiber optic line in Adams County |
Concrete Express Inc. | Bid Tab |
Mar 17 |
FSA 1601-066 (19026R) ~ On structure O-03-C, at US160 near MP 48.601, application of structural concrete coating with all necessary traffic control in Montezuma County |
JITA Contracting | Bid Tab |
Feb 4 |
FSA R200-199 (19682R) ~ Traffic signal improvements at SH96A & Grand, SH96A & Court, and SH96A & Main in Pueblo; SH67A & Hwy 115 in Florence; and SH50B & Hwy 350 in La Junta |
KECI Colorado Incorporated | Bid Tab |
Feb 4 |
IM 0251-348 (20519) ~ On I-25 MP 32.5-39.0, from Aguilar North, 2.5" Mill and Fill on I-25, 2" Overlay on 25 Business to Aguilar, minor bridge repair, approach rebuild on two bridges on I-25; 3" mill and fill southbound I-25 MP-47.099-47.264 in Huerfano County |
APC Southern Construction Company | Bid Tab |
Jul 14 |
IM 0253-242 (20575) ~ On I-25 at Crossroads, MP 259.31 for 1.55 miles, NB & SB bridge replacement including walls near the bridge, embankment, 8" temporary asphalt pavement for on-site detour phasing, concrete pavement, limited permanent HMA, sidewalk, curb and gutter, guardrail, tensioned cable barrier, signing, striping, mulching, and seeding in Larimer County |
Ralph L. Wadsworth Construction | Bid Tab |
Feb 18 |
IM 0253-234 (19626) ~ On 1-I-25: 120th (SH187)-SH7, from 4,000' south of 120th to E-470 widening with express lanes both directions and overlay with asphalt; structure work includes construction of noise walls, retaining walls, concrete box culvert replacement & widening, and bridge widening; additional work includes new center barrier, striping, drainage features, grading, landscaping, and ITS in Adams County |
Hamon Infrastructure, Inc. | Bid Tab |
Feb 11 |
IM 0253-243 (20583) ~ On I-25, SH56 to South to WCR38 climbing lane and overlay in Weld County |
SEMA Construction Inc. | Bid Tab |
Oct 6 |
IM 0253-244 (20732) ~ On I-25, ramp metering at Harmony Road and SH 392 in Larimer County |
WL Contractors | Bid Tab |
Jun 2 |
IM 025A-035 (20929) ~ I-25 MP 139.0-139.7 resurfacing in El Paso County |
Edw. C. Levy Co d/b/a Schmitt Const. | Bid Tab |
Aug 18 |
IM 025A-036 (20963) ~ On I-25 at Raton Pass, blasting, scaling and removal of overhanging rocks, eliminating the hazards from the roadway, including haul road and crossover detour installation and removal in Las Animas County |
Project Cancelled | N/A |
Dec 22 |
IM 025A-036 (20963R) ~ On I-25 at Raton Pass, blasting, scaling and removal of overhanging rocks, eliminating the hazards from the roadway, including haul road and crossover detour installation and removal in Las Animas County |
Rock Solid Solutions Corp. | Bid Tab |
Aug 18 |
ITS 0761-225 (21382) ~ Installation of a fiber optic backbone along the North side of I-76 from I-70 to I-25 then through the I-25 Express Lanes to ITS Note 2 at I-25 and 70th including caissons, lowering device poles, Ethernet switches, fiber laterals, pull boxes, manholes, bored conduit, trenched conduit, bridge mounted conduit, and comm cabinets, and the installation of 4 cameras on the I-76 corridor in Adams, Jefferson and Denver Counties |
Interface Communication | Bid Tab |
Oct 20 |
ITS R100-238 (20771) ~ Node Building Equipment Ethernet Upgrade, and reset, remove and/or installation of ITS devices around the Denver Metro Area; upgrade will include field switches to be retrofitted on existing ITS devices, and removal of existing network equipment; infrastructure items will include bored conduit, trenched conduit, pull boxes, manholes, and installation of new cameras in various counties |
Sturgeon Electric | Bid Tab |
Jul 14 |
ITS SW01-621 (20774) ~ Installation of ITS Node Building & Equipment in Walsenburg, creation of a CWDM Network from new Node- 29th St. Node in Pueblo, field switches to be retrofitted to 5 VMSs, 2 Weather stations, mount 4 Closed Circuit TV Cameras to VMSs, and infrastructure (bored conduit, trenched conduit, pull boxes, and manholes) in Huerfano and Pueblo Counties |
Glaser Electric Company | Bid Tab |
Aug 4 |
ITS SW01-622 (20775) ~ Statewide, tower and sensor replacement of 13 ITS Weather Stations (RWIS) in Regions 1,3, and 4, addition of Cellular Modems and Non-Intrusive Sensors, removal and salvage of old towers and sensor, ITS infrastructure includes bored conduit, trenched conduit, pull boxes, location markers, light standards/foundations, and service meter cabinets |
Interface Communications | Bid Tab |
Oct 20 |
ITS SW01-623 (20776) ~ Replacement of 3 Variable Message Signs (VMS), and retrofit/modify VMS structures in Regions 1, 2, and 4 in various counties; ITS infrastructure that will be included with this project are: trenched conduit, pull boxes, location markers, catwalk/rail access modifications, and electrical system modifications |
Paonia, Inc. | Bid Tab |
May 26 |
ITS SW01-624 (20777) ~ On I-70 at MP 13.5 (Loma EB) & 234.8 (Dumont WB), weigh-in-motion maintenance and upgrades with contrete removal and replacement, installation of new types of scale elements at Loma & re-install existing scale elements at Dumont in Mesa and Clear Creek Counties |
Glasser Electric | Bid Tab |
Mar 3 |
IM 0762-053 (21267) ~ 1" leveling course with a 2" top mat covering the 24' driving lanes, the existing 4' asphalt shoulders will have ABC Class 7 Special along with recycling agent mixed in during the full depth reclamation process then the shoulder will be overlayed with 3" of HMA, other project work includes concrete panel patching, construction signing, temporary pavement markings, permanent pavement marking, and embankment protector removals and replacement in Moran and Washington Counties |
Simon Contractors | Bid Tab |
Jun 9 |
MP 0251-350 (21365) ~ On I-25, guardrail and safety project including removal of guardrail, installation of guardrail at Exit 99B an 100B in Pueblo County |
Cruz Construction | Bid Tab |
Jun 2 |
MP R200-233 (21428) ~ R2, regionwide highway pavement markings in El Paso, Las Animas and Pueblo Counties |
Innovative Marking Systems | Bid Tab |
Sept 29 |
MTCE 0253-256 (21518) ~ In R4, I-25 striping in Bouilder, Larimer and Weld Counties |
Roadsafe Traffic Systems | Bid Tab |
Mar 10 |
MTCE 070A-025 (21387) ~ ON I-70, eastbound and westbound, MP 130.0- 180.0, installing Preformed Plastic Pavement Marking (Type I) (Inlaid) on center line skips in both directions in Eagle County |
Roadsafe Traffic Systems | Bid Tab |
Feb 18 |
MTCE R100-260 (21179) ~ On US285, Pine Junction-Morrison Inn, installation of signs furnished by CDOT and traffic control in Jefferson County |
RDP Barricade Co LLC d/b/a/ Colorado Barricade Co. | Bid Tab |
Feb 11 |
MTCE R100-261 (21178) ~ At various locations in R1, replacement of Class III sign panels and removal of overhead sign lighting and walkways with some sign panels to be provided by CDOT in Adams, Arapahoe and Denver Counties |
WL Contractors | Bid Tab |
Jul 21 |
MTCE R100-272 (21495) ~ In various locations in Region 1, removal and application of Preformed Plastic Pavement Markings, Modified Epoxy Pavement Markings, Preform Thermoplastic Pavement Markings, and Preform Thermoplastic Pavement Marking (Shield) in Arapahoe, Douglas and Gilpin Counties |
Kolbe Striping | Bid Tab |
Dec 22 |
MTCE R100-273 (21539) ~ At various locations in Region 1, Denver Metro Area, removal of overhead sign lighting, replacement of overhead sign panels furnished by the Department and traffic control in Apraphoe, Denver and Jefferson Counties |
Interface Communications | Bid Tab |
Dec 29 |
MTCE R100-275 (21537) ~ At various locations in Metro Denver, replacement of 4 overhead sign bridge structures with monotube cantilever sign structures and associated traffic and erosion control in Adams, Denver, and Jefferson county. |
WL Contractors | Bid Tab |
Mar 10 |
MTCE R200-230 (21366) ~ R2, upgrading of Fiber Optic connectivity via DSL and upgrading Ethernet Switches and their assembly, interconnect fiber from intersection to intersection with 24 count fiber optics in various counties |
Paonia | Bid Tab |
May 5 |
MTCE R300-227 (21133) ~ Removal and replacement of highway signs on US24 A MP 143-192.747, SH300A MP 0-11.583 and SH340A MP 0-13.341 including the rest area in Chaffee, Eagle, Lake and Mesa Counties |
CC Enterprises/Traffic Control Specialist | Bid Tab |
Mar 10 |
MTCE R300-231 (21386) ~ On US 40A & Z, 50A, 550B and SH 13B, 64A, 135A & 394A- refreshing existing crosswalks, stop bars, word and symbol pavement markings with inlaid preformed thermoplastic material in Routt, Moffat, Rio Blanco & Grand Counties |
Roadsafe Traffic Systems | Bid Tab |
Mar 10 |
MTCE R300-232 (21388) ~ On I-70 MP 90-213.5 & SH 82A MP 0-47.15, grinding existing pavement markings and refreshing with inlaid modified epoxy pavement marking material including ramps, cross streets at interchanges, and the North & South Frontage Roads in Vail, no removal or re-striping of "skips" on I-70 and exclusion of part of SH82A in Garfield, Eagle, Pitkin and Summit Counties |
Roadsafe Traffic Systems | Bid Tab |
Jun 23 |
MTCE R300-234 (21414) ~ On Highways 6D, 6E, 9C, I-70A ramps, 82A, and 340A: removal, supply and application of epoxy pavement marking and preformed thermoplastic word, symbol & crosswalk stencils on all roundabouts on state highways within Region 3, pavement markings and stencils shall be ground to create a recessed groove except where such groove already exists in Eagle, Garfield, Mesa, Pitkin and Summit Counties |
Kolbe Striping | Bid Tab |
Sept 15 |
MTCE R400-343 (20936) ~ Throughout R4, pavement marking, removal and application of epoxy pavement marking on 52A, 79B, 119B, and 287C in Boulder, Larimer and Weld Counties |
Roadsafe Traffic Systems | Bid Tab |
Sept 8 |
MTCE R400-355 (21517) ~ Throughout R4, stencil marking project in Arapahoe, Cheyenne, Elbert, Kit Carson, Lincoln and Washington Counties |
Roadsafe Traffic Systems | Bid Tab |
Aug 11 |
MTCE R500-182 (21100) ~ On various highways in Region 5, tape & MMA pavement markings in Archuleta, La Plata and Montezuma Counties |
Roadsafe Traffic Systems, Inc. | Bid Tab |
Feb 18 |
MTCE R500-183 (21206) ~ On various highways in R5, water based high build striping over existing striping in Montezuma, Rio Grande and Saguache Counties |
Roadsafe Traffic Systems, Inc. | Bid Tab |
Jan 28 | NH 0171-101 (18146) ~ On SH 17 between MPs 73.962 and 88.481 of a 2" heating and remixing treatment, 3' shoulder widening per side, 1.5" HMA overlay, earthwork, topsoil, shouldering, traffic control, and striping in Alamosa and Saguache Counties | Oldcastle SW Group | Bid Tab |
Jan 21 | NH 062A-016 (19411) ~ RAMP project consisting of reconstruction of SH 62 & the Town of Ridgway enhancement project in Ouray County | American Civil Constructors | Bid Tab |
Mar 24 | NH 0853-099 (20655) ~ On US85, MP 240-246 Southbound, resurfacing: treatment of 3.5" net rise to the existing surface including a 1" RCI and 2.5" of HMA overlay with 24" x 3" deep removal of HMA in locations with pot-holing (approx. 1,000 SY) in Weld County | Coulson Excavating Company | Bid Tab |
Dec 1 | NH 0853-100 (20656) ~ Resurfacing on US85 north of Ft. Lupton from MP 242-246 in Weld County | Aggregate Industries-WCR Inc. | Bid Tab |
Mar 3 | NHPP 0171-103 (20363) ~ On SH17, MP 16.74, structure P-11-A over the Conejos River, work will realigning flows between piers and abutments by installing bendway weirs, armoring of piers, abutments, and river banks to reduce scour, guardrail approaches will also be added to the bridge in Conejos County | Tezak Heavy Equipment | Bid Tab |
Jun 6 | NHPP 0242-059 (19643) ~ On US 24 in Buena Vista, ~MP 209.8-213.2, removal and replacement of sidewalk, curb and gutter, ADA ramps, lighting, intersection signalization, pedestrian crosswalks, refuge islands, drainage improvements, minor resurfacing, and partial roadway reconstruction in Chaffee county | A&S Construction | Bid Tab |
Jan 7 | NHPP 0242-064 (20405) ~ On US24, MP 213.434, Structure I-12-T bridge repairs and rehabilitation with Class II and Class III deck removal and repair in Chaffee County | TLM Constructors Inc. | Bid Tab |
Apr 14 | NHPP 0252-445 (20836) ~ On I-25, overlay from Hampden to Evans Avenues in Denver County | Brannan Sand and Gravel | Bid Tab |
Sept 29 | NHPP 0402-093 (20969) ~ On US40, MP 89.2-89.9 & SH 13 MP 89.7, work consist of replacing traffic signal poles, mast arms, traffic signal heads, detection equipment, installation of conduit, signs, replacement of pedestrian curb ramps and traffic signal controllers and cabinets in Moffat County | Sturgeon Electric | Bid Tab |
Jan 28 | NHPP 0501-065 (20514) ~ On US 50, 1.5" mill & fill, some overlay, roadway drainage corrections, median reconstruction, curb ramp upgrades, access control modifications, guardrail adjustments and safety upgrades, striping and inlets with associated pipes; bridge work includes bridge joint replacement, rail repair for H-02-FK, waterproofing membrane, deck rehab, and sidewalk curb repair: H-02-CA resurfacing and approach repair: H-02-DZ and resurfacing and rail replacement: H-02-T in Mesa County | Oldcastle SW Group | Bid Tab |
Mar 3 |
NHPP 0502-072 (19495) ~ On US50, MP 121.6-123.0, roadway reconstruction including widening, earthwork, aggregate base course, HMA, culvert replacement, erosion control, and landslide mitigation through the construction of a coupled shear pile system in Gunnison County |
SEMA Construction | Bid Tab |
Mar 3 |
NHPP 0502-074 (20133) ~ On US50, MP 154.0-166.9 (no work within the Gunnison City limits) MP 156-158, resurfacing including cold bituminous recycle, HMA overlay, epoxy pavement marking, scope of bridge work on J-09-AB, J-09-B: remove existing asphalt mat, repair damaged deck locations, replace existing bridge joints, install waterproofing membrane, place 3" HMA overlay in Gunnison County |
Oldcastle SW Group | Bid Tab |
Dec 22 | NHPP 0702-358 (20902) ~ On I-70, MP 158.5-168 mainline resurfacing, 1.5" SMA overlay, guardrail work, rumble strips, striping, signing, bridge repair, bridge rail, lighting improvement, culvert slip line repair and traffic control management in Eagle County | Oldcastle SW Group | Bid Tab |
Apr 14 | NHPP 0702-363 (21132) ~ On I-70, MP 197.5-203.5, mill and fill paving from Officers Gulch to Frisco in the right EB lane travel lane, paving EB on/off Ramps at Officers Gulch and both Frisco exits and minor sign work in Summit County | A & S Construction | Bid Tab |
Aug 4 | NHPP 0703-420 (20323) ~ In the Eisenhower Johnson Memorial Tunnel (EJMT), removal and replacement of the existing 2400V switch gear in the East and West building portals in Clear Creek and Summit Counties | Sturgeon Electric Company | Bid Tab |
Apr 14 | NHPP 0703-430 (20781) ~ I-70 Sheridan and Tennyson fiber wrap in Denver and Jefferson Counties | Restruction Corporation | Bid Tab |
May 12 | NHPP 070A-024 (20783) ~ On WB I-70 to SB I-225 bridge repairs which include expansion joint replacements, deck repairs, polyester concrete overlay and traffic control in Adams and Denver County | The Truesdell Corp. | Bid Tab |
Dec 15 | NHPP 0821-106 (21198) ~ Wall repair project along SH82, MP 31-33, in constrained work space with limited site access using long reach equipment: minor excavation, auxiliary anchor dowels and ground nails, shotcrete, concrete coping, concrete stain, guardrail and traffic control in Pitkin County | Hamilton Construction Company | Bid Tab |
Dec 1 | NHPP 145A-062 (20170) ~ On SH145, Lizard Head North Chipseal, MP 59.406 - 71.44, two lifts of Chipseal, placement of a Type-II Cover Coat (1st lift), Type-I Cover Coat (2nd lift), both lifts to utilize CRS-2P Emulsion, fog seal emulsion application, temporary striping shall be required after placement of chips and after the fog seal in Dolores and San Miguel Counties | Kilcore Companies, dba Elam Construction Inc. | Bid Tab |
Jan 21 | NHPP 145A-064 (20501) ~ On SH145, at MP 47.45 near the northern limits of the town of Rico, progressing approximately 11.8 miles to MP 59.36 near the San Miguel County Line, a one inch HMA leveling course followed by a one and one half inch HMA overlay, including culvert and guardrail replacement, bridge rehabilitation, and final signing and striping in Dolores County | Elam Construction Inc. | Bid Tab |
Jan 7 | NHPP 145A-071 (21059) ~ On SH145 MP 23.0-46.3, a two lift Chip Seal with a Type II Cover Coat (1st lift) and a Type I Cover Coat (2nd lift); these lifts will utilize CRS-2P Emulsion, a fog seal emulsion application, temporary striping both before and after the fog seal application, and application of Final High Build Striping in Dolores and Montezuma Counties | Oldcastle SW Group | Bid Tab |
Dec 15 |
NHPP 1602-142 (19401) ~ Intersection improvements at US 160 and CR 19 in Rio Grande County |
Oldcastle SW Group | Bid Tab |
Jan 7 |
NHPP 1602-148 (20183) ~ On US160 MPs 165.87-174 with a 1" leveling course, 1.5 inch overlay, shouldering, traffic control, replacing guardrail, snow shed roof repair, minor subgrade improvements, subsidence area reconstruction, and striping in Mineral County |
Oldcastle SW Group |
Bid Tab |
Jun 16 |
NHPP 1602-155 (20797) ~ On US160 Wolf Creek Pass-, installation fiber optic cable, conduit and manholes from Wolf Creek Pass tunnel to the town of South Fork Mineral and Rio Grande |
Rejected | N/A |
Apr 28 |
NHPP 160A-029 (20061R) ~ On 9 US160 signal optimization project in Alamosa, Archuleta, Chaffee, La Plata, Montezuma and Rio Grande Counties |
CS Construction | Bid Tab |
Mar 17 |
NHPP 160A-029 (20061) ~ On US160, Cortez to Alamosa, improvement to signals for coordination and access in Alamosa, Archuleta, Chaffe, La Plata, Montezuma and Rio Grande Counties |
Rejected | N/A |
Mar 17 |
NHPP 2853-002 (20406) ~ On US285, Structure J-12-B (Chalk Creek) scour mitigation in Chaffee County NOTE: ESB PROJECT |
Y & K Excavation | Bid Tab |
Mar 3 |
NHPP 4912-005 (19399R) ~ Removal of 40,000 SYy of asphalt pavement, placement of 38,000 SY of 8" Concrete pavement, replacement of 21 street lights, installation of 3,800 LF of C and G Type 2, installation of 6,400 LF of electrical conduit, installation of 400 feet of Drainage Pipe, 5 drainage inlets,signing and striping in Montezuma County |
Lawson Construction Co. | Bid Tab |
Mar 17 |
NHPP 5502-085 (20634) ~ North of Ridgway, repair invert/walls of existing concrete box culvert |
Mountain Valley Contracting | Bid Tab |
Mar 17 |
NHPP 5502-091 (21056) ~ On US550B, San Juan County Line to Coal Bank Pass, MP 49.84-55.95, surface treatment, guardrail replacement, signing and striping in San Juan County |
OldCastle SW Group Inc | Bid Tab |
Jan 7 | NHPP R100-232 (20516) ~ Concrete & steel tub girder clean out on 6 R1 bridges (I-25 at I-270, W. 44th Ave., W. Colfax Ave, Auraria Pkwy, E-470 and I-70 at Wadsworth) includes clean out of debris form work and organic materials, traffic control, erosion control, public information, and confined space entry in Adams, Denver and Jefferson Counties | Labato Construction | Bid Tab |
Jan 7 | NHPP R100-234 (20681) ~ Throughout R1, essential expansion joint repair on 9 bridges - some are only the gland replacement and others are total replacement of joints, traffic control and detours, public information, and cover plate placement in Adams, Denver and Jefferson Counties | ABCO Contracting Company | Bid Tab |
Mar 24 | NHPP R100-237 (20699) ~ In Region 1 along the Front Range, trenchless rehabilitation and repair of culverts throughout the region using previously approved culvert repair methods and technologies in Clear Creek, Douglas and Jefferson Counties | Repipe Construction LLC | Bid Tab |
Aug 18 | NHPP R100-253 (20899) ~ At various locations in Denver metro, wall repair including joint sealant, concrete patching, structural concrete stain, reinforcing steel, fence masonry (sound barrier), fence concrete (sound barrier), and vertical drainage wick shotcrete in Arapahoe, Boulder, Denver and Jefferson Counties | No Bids | N/A |
Dec 15 | NHPP R100-253 (20899R) ~ At various locations in Denver metro, wall repair including joint sealant, concrete patching, structural concrete stain, reinforcing steel, fence masonry (sound barrier), fence concrete (sound barrier), and vertical drainage wick shotcrete in Arapahoe, Boulder, Denver and Jefferson Counties | Hamilton Construction Co. | Bid Tab |
Jan 14 | SHE 025A-029 (20591) ~ On I-25 in Metro Denver, construction of ramp meters at 12 locations with minor roadway widening at 3 sites in Arapahoe, Denver and Douglas Counties | Sturgeon Electric | Bid Tab |
Jan 14 | SHE 0702-353 (20582) ~ I-70 Vail Pass MP 180-186 Type 4 to Type 7 Barrier Replacement and Bridge Rail Replacement in Eagle County | New Design Construction | Bid Tab |
Feb 18 |
SHE 0703-394 (19064) ~ On US 6 and I-70 Eastbound acceleration lane and chain station project. Salient features include roadway widening for acceleration lane and chain station, embankment, HMA, drainage, guardrail, water quality features, roadway/chain station lighting, ITS, and signing/striping in Clear Creek County |
Columbine Hills Concrete, Inc. | Bid Tab |
Aug 25 |
SHE 0961-015 (21300) ~ ON SH96, MP 85.44-86.33, upgrade guardrail to MGS 31" and extend one section, widen inside shoulders and overlay pavement between widening, add curve approach rumble strips, and update signing and delineators in Pueblo County |
Tricon 2 | Bid Tab |
Nov 3 | SHE 1211-087 (21462) ~ At intersection of 55th Avenue and SH 121 (Wadsworth Boulevard) conversion into a right-in, right-out intersection from a fully signalized intersection, with removal of half of the signal and construction of raised islands in Jefferson County | New Design Construction | Bid Tab |
Jul 21 | SHE C040-048 (21496) ~ Installation of traffic signals at the intersections of Powers & Bradley and SB I-25 & SH 16: related surface improvements such as 440 SY of 8.5 reinforced concrete pavement, 2,725 SY of colored concrete median, and 306 LF of curb and gutter, in El Paso County | No Bids | N/A |
Sept 22 | SHE C040-048 (21496R)~ At the intersections of Powers & Bradley and SB I-25 & SH 16, installation of traffic signals, surface improvements include 440 SY of 8.5 reinforced concrete pavement, 2,725 SY of colored concrete median, 306 LF of curb and gutter, etc. in El Paso County | Paonia, Inc. | Bid Tab |
Nov 3 | SHE R100-220 (20182) ~ Upgrades to signal controllers for identified corridors with fiber work to upgrade communication format and new signal cabinet switches in Adams, Arapahoe and Jefferson Counties | Paonia, Inc. | Bid Tab |
May 26 | SHE R100-239 (20794) ~ Replace traffic signals: SH224 at Dahlia St.; SH287 @ Lamar St., SH287 @ 10th Ave. in Adams and Broomfield Counties | Interface Communications | Bid Tab |
Jun 23 | SHE R100-256 (21005) ~ Traffic signal and safety improvements at various locations in Region 1 in Arapahoe, Denver and Douglas Counties | Technology Constructors | Bid Tab |
Mar 3 | STA 0091-042 (19930) ~ Realignment of SH 9 with earthwork, 4 lane roadway construction on virgin alignment with 3 large culvert underpasses with adjoining walls for bike path & wildlife in Summit County | SEMA Construction | Bid Tab |
Dec 1 |
STA 0132-020 (20559) ~ On SH 13 north of Craig MP 118.80 to 123.08: reconstruction, widening, and snow fence project with earthwork, grading, surfacing, culvert replacements, guardrail, shouldering, fencing, snow fence, striping, and erosion control in Moffat County |
Connell Resources | Bid Tab |
Feb 11 |
STA 0241-057 (18266S) ~ On US24, MP 147.12 replacement of cross creek culvert structure 024A147120BR & approaches with a 20'x8' concrete box culvert including temporary culverts, grading, paving, pavement widening, guardrail & bridge rail, temporary signals, traffic control, signing & striping and sanitary sewer replacement in Eagle County |
Oldcastle SW Group | Bid Tab |
Sept 15 |
STA 0243-084 (19723) ~ On SH 24 MP 356.7 east ~ 7.9 miles, resurfacing, HMA overlay, and striping in Elbert County |
Simon Contractors | Bid Tab |
Mar 24 |
STA 0243-088 (20857) ~ On US24, MP 423.5 to ~ 14.5 miles East, resurfacing with HMA overlay and striping in Kit Carson County |
McCromick Excavation & Paving | Bid Tab |
Nov 17 |
STA 030A-033 (20318) ~ Asphalt mill and overlay along 6th Avenue (SH30) between Potomac Street and Airport Boulevard in Aurora, includes curb and gutter, median, sidewalk, and curb ramp replacements, bridge deck rehabilitation over Tollgate Creek and High Line Canal, ADA/MUTCD upgrades, and signing and striping in Arapahoe County |
Martin Marietta Materials | Bid Tab |
Jul 14 |
STA 0343-038 (19548) ~ US34 signal upgrade at Barlow Road in Fort Morgan, Morgan County |
McAtee Construction | Bid Tab |
Jan 21 |
STA 0362-036 (20580) ~ US 36 Yuma County Chip Seal with pavement marking removal and striping in Yuma Count |
Intermountain Slurry Seal | Bid Tab |
Apr 21 |
STA 0503-083 (19906) ~ Roundabout installation at Dozier Ave. & Fremont Dr., traffic signal installation at US 50 & Steinmeier Ave., removal of traffic signal at US 50 & Dozier, and US 50 island modifications between Dozier Ave. and Berry Pkwy. within the corp. limits of Cañon City in Fremont County |
Tezak Heavy Equipment | Bid Tab |
Dec 15 |
STA 0503-086 (20345) ~Addition of a Acceleration/Deceleration Lane to US 50 from Wills Blvd to BNSF Railroad Westbound: HMA paving, curb&gutting installation, signing, utility coordination, top soil installation, and other items as indicated in the plan set in Pueblo County |
Tony J. Beltramo and Sons | Bid Tab |
Jul 21 |
STA 0703-432 (20850) ~ I-70/US 6 to Georgetown Resurfacing Project with milling, HMA paving, reset and replace Type 3 Guardrail, culvert cleaning, signing and striping, and erosion control in Clear Creek County |
APC Construction Co. | Bid Tab |
Aug 11 |
STA 0741-019 (20063) ~ On SH74 overlay from El Rancho to Evergreen, MP 0.894 to 6.720; milling and paving 2.5 inches of HMA pavement on SH 74 from CR 65 to ~ MP 6.72, Bridges F-15-CZ and F-15-DA (MM 3.03), replacement of expansion joints replaced, minor widening of SH 74 at MP 1.9 to construct an 8 foot shoulder where there currently is no shoulder, and ~ 9,300 CY of rock excavation in Jefferson County |
APC Construction Co. | Bid Tab |
Jan 14 | STA 1192-019 (19357) ~ On SH119: County Line to I-25, concrete pavement placed upon a full depth reclamation to the west and concrete reconstruction to the east, including flood hardening measures, minor structure repair, etc. in Weld County | Castle Rock Construction Company of Colorado | Bid Tab |
Mar 3 |
STA 119A-063 (19705) ~ ON SH119B, MP 44.995-54.42 4" asphalt overlay with sections of both 5" mill and fill overlay and 2" asphalt overlay, guardrail and bridge rail replacement, minor bridge rehab work and sign replacement in Boulder County |
Asphalt Specialties Co. | Bid Tab |
Jul 28 |
STA 2873-173 (20059) ~ Adaptive signals on US 287 & SH 119 in Boulder County |
Sturgeon Electric | Bid Tab |
Feb 18 |
STA 2873-177 (20113) ~ On US287 MP 307.95-309.20, asphal milling 0"-2" and 2"-4" HMA overlay with guardrail replacement in Boulder County |
Asphalt Specialties, Co., Inc. | Bid Tab |
Aug 25 |
STA 2873-183 (21305) ~ On US287 & LCR17 near Berthoud, milling and an HMA overlay, an HMA overlay to level approach slabs, and cleaning and adjusting of edge drain cleanouts and outlets in Larimer County |
Rejected | N/A |
Jul 7 |
STA 340A-019 (20987) ~ ON SH340, MP 2-8.65 (3 work zones) 2" HMA overlay with 4" asphalt shoulders; milling where paving abuts existing gutter, at transition and approach roads and accesses; striping with configuration changes, sign and thermoplastic additions, and guardrail end section replacement in Mesa County |
Oldcastle SW Group | Bid Tab |
Aug 18 |
STA 3852-016 (21389) ~ At intersection of US385 & Yuma County Rd. MP 33.6, work includes blading and compacting base course, HMA paving, signing and striping and final seeding and erosion control in Yuma County |
Simon Contractors | Bid Tab |
May 12 |
STA 3921-017 (21145) ~ Signal pole replacement at SH392 and 9th Street, Windsor in Weld County |
Interface Communications | Bid Tab |
Jan 28 |
STA 392A-019 (20748) ~ On SH392, E. of US 85 ~ 10.5 miles, resurfacing which includes H.M.A., overlay, full depth reclamation, culvert, & striping in Weld County |
Martin Marietta Materials | Bid Tab |
Sept 29 |
STA 392A-020 (21304) ~ On SH 392, MP 115.531-141.582 with the following salient features: bridge work on C-18-BR, C-18-AZ and B-19-K, 392B118610BR, 392B124710BL, culverts, full depth reclamation, HMA, guardrail, mailboxes, shouldering, approaches, delineators, seeding, mulching and striping in Weld County |
Martin Marietta Materials | Bid Tab |
Sept 29 |
STA 402A-010 (20953) ~ On SH 402 & LCR 9E Intersection improvements SE of Loveland, including excavation, embankment and HMA paving in Larimer County |
Coulson Excavating | Bid Tab |
June 9 | STA C510-024 (17797) ~ On US40, 2" mill and 2" HMA full width, expansion joint work on F-15-CN; concrete deck repair and resurfacing on F-15-Q; shoulder reconditioning to repair rillets, filled and compacted; FHWA compliant Type 3 Guardrail adjustments (31 in. MGS); damaged Type 3 Guardrail to be reset with new corrosion-resistant rail and new guardrail to be installed in Clear Creek and Jefferson Counties | Martin Marietta Materials | Bid Tab |
Apr 14 |
STA R200-213 (20499) ~ In Region 2, installation of a linear in culverts at four (4) with culvert cleaning, erosion control, culvert lining, traffic control, and other items in Las Animas, Otero and Prowers Counties |
American West Construction LLC | Bid Tab |
Mar 3 |
STA R300-219 (20565) ~ On US50 at MP 90.54, US550 MP 128.32-128.87 replacing traffic signal poles, mast arms, traffic signal heads, detection equipment, installation of conduit, signs and traffic signal controllers and cabinets in Montrose County |
CS Construction Inc. | Bid Tab |
Apr 7 |
STA R300-222 (20860) ~ On SH348 at MP 6.64 and US50 at MP 108.8 with culvert replacement (8' X 10' concrete box culvert) temporary culverts, grading, paving, striping, erosion control and temporary traffic control; and cured in place pipe (CIPP) treatment to an existing culvert in Montrose County |
Ridgway Valley Enterprises, Inc. | Bid Tab |
Mar 31 |
STA R400-295 (19778) ~ Signal pole replacements at 4 locations: US287/Spring Park Dr/Johnson Dr. in Fort Collins, SH 7/38th St./Marine St. in Boulder, 14th Ave./9th St. in Greeley, and SH287 (Main St.)/15th Ave. in Longmont in Boulder, Larimer and Weld Counties |
WL Contractors | Bid Tab |
Dec 15 |
STA R400-346 (20941) ~ R4 signal pole replacements on SH 93, SH 157, SH 7 and Business 34 in Weld and Boulder County |
WL Contractors Inc. | Bid Tab |
Jan 14 | STA R600-441 (19706) ~ A 2.5" mill/fill with HMA, curb ramps, raised islands, manhole and valve box adjustments, signal work, and permanent pavement markings in Arapahoe and Douglas Counties | Martin Marietta Materials | Bid Tab |
June 16 | STM 0252-443 (20791) ~ Northbound I-25 ramp acceleration lane project in El Paso County | Tricon 2, LLC | Bid Tab |
June 9 | STM 0961-013 (19134) ~ On SH96 , an overlay from the Arkansas River (Midtown Cir.) east through the corridor over SH 50B to the 11th Street bridge, including handicapped ramps, corridor beautification, storm sewer and signals on Bradford, Chester, Erie, Fountain, Glendale, and Hudson with rehabilitation on 4 bridges on SH 96 and 1 bridge off corridor at the I-25 and S 50 Junction in Pueblo County | Kiewit Infrastructure | Bid Tab |
June 16 | STM 115A-017 (20788) ~ On I-25: MP 119-128, SH115: MP 11-12.5, installation of median cable barrier on I-25 and Guardrail Type 3 on SH 115 in El Paso and Fremont Counties | Rejected | N/A |
Aug 11 | STM 115A-017 (20788R) ~ On I-25, MP 119-128, installation of median cable barriers and on SH115, MP 11-12.5 Guardrail Type 3 in El Paso and Fremont Counties | Adarand Construcotrs | Bid Tab |
Feb 4 | STR 0141-025 (20765) ~ Chip Seal SH14 MP 34.7-64.9 &MP 75.5-87, MP 34.7 is close to the Town of Walden/MP 64.9 is near the top of Cameron Pass, MP 75.5-87 is on the east side of Cameron Pass toward Fort Collins in Jackson and Larimer Counties | Oldcastle SW Group | Bid Tab |
May 26 | STR 0171-104 (20404) ~ In Region 5, priority culvert work on SH17, US160 and US24 in Conejos County | American West Construction | Bid Tab |
Dec 15 | STR 041A-001 (20858) ~ On SH 41 North of US 160 to Utah state line, ~9.5 miles, resurfacing: pre-leveling with a paver, full width 3/4" leveling course, double chip seal with Type I & II, fog seal, signing, striping and guardrail replacement in Montezuma County | Oldcastle SW Group | Bid Tab |
Dec 1 | STR 065A-022 (20703) ~ On SH 65, MP 36.000-61.387, Mesa North, resurfacing: two treatments 36.0-48.0 chip seal , 48.0 to end of alignment 2" overlay, guardrail replacement, bridge maintenance, scour mitigation and ADA ramps in Mesa County | Kilgore Companies dba Elam Construction Inc. | Bid Tab |
Mar 10 | STR 096A-046 (20778) ~ Structure K-25-N, patching concrete materials to repair structure in Kiowa County | APC Southern Construction Company | Bid Tab |
Feb 18 | STR 149A-025 (20804) ~ SH149 Spring Creek Pass North, MP 56-70, resurfacing, including cold-in-place recycling treatment, HMA overlay, bridge deck repair, pavement marking, delineators, and construction traffic control in Hinsdale County | Oldcastle SW Group | Bid Tab |
Jan 14 | STR 150A-008 (20625) ~ On SH150 from US 160 to Great Sand Dunes National Park boundary, construction signing, temporary erosion control, chip sealing the existing roadway, and final striping in Alamosa County | Oldcastle SW Group | Bid Tab |
Jan 14 | STR 160A-028 (19954) ~ Addition of a right turn lane at intersection of US 160 to CR 450, excavation, embankment, paving, striping, traffic control, seeding, and other items as shown in the plan set Huerfano County | Tricon II | Bid Tab |
Jun 30 | STR 184A-005 (20645) ~ On SH184, MP 1.26, bridge replacement over Narraguinnep Canal in Montezuma County | Structures Inc. | Bid Tab |
Aug 11 |
STR 2871-034 (19668) ~ On US50 (MP 434.85-435.39) and US 287 (MP 76.3-77.639), reconstruction with full depth concrete, installation of 2 RRFB pedestrian signs at spot locations, concrete paving, curb and gutter, ADA ramps, sidewalk, roadway lighting, storm drainage, water lines, fiber optics, signing, striping, signals and utility relocations in Prowers County |
American Civil Constructors | Bid Tab |
Feb 18 |
STR 3501-016 (20696) ~ On SH350 East and West 1.5" mill and 1.5" fill overlay in Las Animas and Otero Counties |
APC Southern Construction Co. LLC | Bid Tab |
Mar 24 |
STR C540-015 (20752) ~ In Park County: resurfacing US24, MP 225.55-234.00, US285 MP 161.80-171.33 consisting of: asphalt milling, HMA paving, guardrail replacement, inlaid epoxy pavement marking, CMP culvert, embankment, and scour repair at Structure I-13-I with soil riprap in Park County |
A&S Construction Co. | Bid Tab |
Mar 17 |
STR R200-218 (20733) US 287 MP 21.0-133.0, concrete panel removal and replacement, striping, traffic control and erosion control at various locations ans subgrade stabilization at 2 culverts in Baca, Cheyenne, Kiowa and Prowers Counties |
Iowa Erosion Control | Bid Tab |
Apr 7 |
STR R200-219 (20760) ~ Region 2 FY17 chipseal in Manzanola and Las Animas areas, with Type I chipseal placement and associated guardrail, road closure gate work in the Las Animas area in Bent and Otero Counties |
RBK Construction, Inc. | Bid Tab |
Jul 28 |
STU 0242-066 (20467) ~ Overlay of 2 sites through Manitou Springs along with updates to 30 ADA ramps, Class 2 and 3 repairs will be done on the deck of structure I-17-GH located on Garden of the Gods Place and drainage improvements in El Paso County |
Kiewit Infrastructure | Bid Tab |
Apr 11 |
STU 0252-429 (19192) ~ At I-25 and Arapahoe Road, mainline bridge construction, ramp improvements, road widening, Yosemite St. intersection operation improvements, frontage road relocation pedestrian accommodations, sound wall and landscaping in Arapahoe County |
Kraemer North America | Bid Tab |
Apr 11 |
STU 0252-429 (19192) ~ CMGC CAP Award |
Kraemer North America, LLC | Bid Tab |
Mar 24 |
STU 4701-129 (20846) ~ On C-470, resurfacing, S. Rooney Rd. to Ken Caryl, 1" HMA and 2" SMA. Work will include shouldering, bridge joints, deer ramps, and fence in Jefferson County |
APC Construction Co. | Bid Tab |
Aug 18 |
STU R200-223 (20807) ~ Traffic Signal Replacements on Hwy 21A and 24A within the corporate limits of Colorado Springs & Woodland Park in El Paso County and within corporate limits of Woodland Park in Teller County |
WL Contractors | Bid Tab |
Save for project NHPP 0502-072 (19495), all projects have been awarded to the low apparent bidder. Please see this link for details regarding the award of NHPP 0502-072 (19495).