Bid Tabs - 2015
Letting Dates |
Project Description |
Low Bidder/Award Winner |
Bid Tabulation |
Oct 29 |
BR 0063-044 (19395) ~ On US 6 in Eagle County. It begins at MP 164.6 and extends approximately 1 mile to MP 165.6. The work includes replacement of the existing bridge F-10-C over Lake Creek with a new bridge F-10-AI. The improvements include a detour, grading, drainage, paving, traffic control management, bridge replacement and striping and signing in Eagle County |
Hamilton Construction Co. |
|
Mar 12 |
BR 0252-437 (19942) ~ Overlaying 7 bridges with a thin bonded overlay (polyester concrete), replacing the expansion devices on 3 structures and repairing tiles along Fontanero interchange and Uintah interchange retaining structures in El Paso County |
Myers and Sons |
|
Jan 15 |
BR 0252-440 (20362) ~ On I-25: Upper Lake Gulch Road Bridge repair consisting of milling, erosion control, SMA, bridge deck & pier repair, and traffic control in Douglas County |
N/A |
No bids |
Feb 19 |
BR 0252-440 (20362R) ~ On I-25: Upper Lake Gulch Road Bridge repair consisting of milling, erosion control, SMA, bridge deck and pier repair and traffic control in Douglas County |
N/A |
No bids |
Apr 16 |
BR 0252-440 (20362S) ~ On I-25, Upper Lake Gulch Road bridge repair: milling, erosion control, SMA, bridge deck and pier repair and traffic control in Douglas County |
Structures, Inc. |
|
Apr 30 |
BR 0253-238 (19916) ~ On I-25, bridge join and deck repairs on various structures between MP 244 to 270 in Larimer and Weld Counties |
Myers & Sons Construction |
|
Feb 5 |
BR 0402-086 ~ On US40, replacement of Sage Creek Bridge, C-08-E, with a concrete box culvert in Routt County |
Precision Excavating Inc. |
Bid Tab |
Dec 10 |
BR 0705-081 (20263) ~ On I-70, bridge deck rehab on 8 structures in Kit Carson County |
ABCO Contracting Inc |
Bid Tab |
Mar 5 |
BR 157A-012 (19918) ~ In Fort Collins and Boulder, bridge rehab under RAMP Bridge Preservation project in Boulder and Larimer Counties |
ABCO Contracting Inc. |
Bid Tab |
Feb 5 |
BR M320-084 ~ On two Speer Boulevard Bridges and one 23rd Avenue Bridge over I-25, rehabilitation projects including joint elimination, waterproofing, frame leg encapsulation, door replacements, epoxy injections, minor widening of SB I-25 with milling, resurfacing, restriping of these lanes, vertical clearance signage and striping on the girders in Denver County |
N/A |
Rejected |
Mar 19 |
BR M320-084 (19553R) ~ On two Speer Boulevard Bridges and one 23rd Avenue Bridge over I-25, rehabilitation projects including joint elimination, waterproofing, frame leg encapsulation, door replacements, epoxy injections, minor widening of SB I-25 with milling, resurfacing, restriping of these lanes, vertical clearance signage and striping on the girders in Denver County |
Hamon Contractors |
Bid Tab |
Mar 12 |
BR M850-024 (20253) ~ Along Business 24 West, North of Manitou Springs, bridge rehabilitation project in El Paso County |
N/A |
Rejected |
Dec 17 |
BR M850-024 (20253R) ~ On US 24, I-17-A bridge structure rehabilitation north of Manitou Springs in El Paso County |
Wildcat Construction Co. |
Bid Tab |
May 28 |
BRS 0704-215 (16756) ~ On I-70 beginning at MP 329 and extending approximately 12 miles east to MP 341, work consists of structure rehabilitation, which includes hydrodemolition, milling, and polyester concrete overlay in Arapahoe, Elbert, and Lincoln Counties |
Structures, Inc. | Bid Tab |
Apr 30 |
C 0063-051 (20609) ~ Above US6 Loveland Pass – Sister’s Avalanche Pass, installation of specialized remote preventative avalanche system in Clear Creek County |
Harrison Western |
Bid Tab |
July 9 |
C 0501-061 (18840) ~ On SH 50 and San Juan Avenue, MP 91.2-92.5, construction of a right turn accel./decel. lane, upgrade storm sewer system, replace traffic signal pole and traffic signal detection system in Montrose County |
Mountain Valley Contracting |
Bid Tab |
Sept 17 |
C 0252-434 (19869) ~ Throughout the TREX corridors, installation of new and redundant anchor system on retaining wall coping panels; safety and coordination of extensive night highway and RTD Light Rail work, clean up of residues left from operations such as drilling, and Highway Traffic Control including Contractor developed MHTs for special ramp areas in Douglas, Arapahoe, and Denver Counties |
Hamon Contractors |
Bid Tab |
Apr 30 |
C R600-409 (18753) ~ On US36 wetland mitigation to be constructed at the confluence of S. Boulder Creek, Boulder Creek and Valmont Road--construction site is 24.9AC with 18.7 AC of disturbance--project work consists of grading, excavating, seeing, planting, and the realignment of bike path |
SEMA Construction |
Bid Tab |
May 5 |
ER 030A-034 (20652) ~ Permanent Repair of SH30 flood damage in Denver County |
SEMA Construction |
Bid Tab |
Jul 16 |
ER 0703-424 (20351) ~ On I-70 ROW MP 241.6-Clear Creek County Frontage Road (CR314), stabilization of hillside |
SEMA Construction |
Bid Tab |
Feb 5 |
ER 2254-087 ~ On I-225, permanent flood repairs project: regrading eroded slope, installation of Class 3 turf reinforcement mat, reseeding, sediment removal, and sawing/sealing of concrete pavement joints in Adams and Arapahoe Counties |
N/A |
Rejected |
May 28 |
ER R400-325 (20242) ~ Scour mitigation project for 6 different structures at 5 different sites: work shall include placement of riprap and soil riprap, HMA slope and ditch paving, shotcrete, shoring, embankment protector, landscaping, landscaping maintenance, seeding and mulching, erosion control, and traffic control in Larimer and Weld County |
L&M Enterprises |
Bid Tab |
Jul 9 |
ER R400-326 (20243) ~ Scour repair at 5 sites with 6 structures, removal of numerous items including slope and ditch paving, riprap and fencing, unclassified excavation, embankment (complete in place), structure excavation, structure backfill, placement of riprap and soil riprap, concrete slope and ditch paving, fencing, landscaping, seeding/mulching, erosion control, and traffic control in Boulder and Weld Counties |
Zak Dirt |
Bid Tab |
Mar 12 |
FBR 0703-410 (19984) ~ Peak Period Shoulder Lanes CMGC |
Mountain Corridor Constructors |
Bid Tab |
Mar 09 |
FBR 0703-410 (19984-COMBO) ~ CMGC CAP Award |
Mountain Corridor Constructors |
Bid Tab |
Dec 1 |
FBR 0821-094 (18158-COMBO) ~ CMGC CAP Award |
Granite and RWL Joint Venture |
Bid Tab |
Mar 26 |
FSA 0341-085 (20497) ~ On US34 at 71st Ave, project consist of access control installation of median including signing and striping in Weld County |
Mountain Constructors |
Bid Tab |
Jun 11 |
FSA 0703-411 (20070) ~ On I-70 at EJMT, installation of a permanent traffic metering device at the west portal with overhead sign structures, traffic signals, lane use signals, control systems, electrical conduit, wiring, reset of existing equipment; replacement of attendant station buildings at the Tunnel east and west portals; and construction traffic control in Clear Creek and Summit Counties | ADB Companies, Inc. | Bid Tab |
May 28 |
FSA 0703-413 (20143) ~ I-70: @ 32nd Ave. & @ Roney Rd. chain up lighting project in Jefferson County |
Interface Communications |
Bid Tab |
Jan 15 |
FSA 086A-053 ~ on US 85 from Factory Shops Blvd. to US85 Founders Parkway interchange jct. I-25, structure and SH86 to Allen Way, ramp and interchange improvements, expansion joint, wall repair, guardrail removal, concrete pavement, curb & gutter, sidewalk, traffic control, signing, striping, and erosion control in Douglas County |
Kraemer North America, LLC |
Bid Tab |
Mar 19 |
FSA 096A-043 (19140) ~ On SH96, shoulder widening, embankment, ABC (CL 6), HMA, structure repair, milling, topsoil, seeding and mulching, signing and striping in Kiowa County |
A&S Construction |
Bid Tab |
May 28 |
FSA 145A-057 (19397) ~ On SH145 at County Road P, North of Cortez, work to include widening SH145 to include northbound and southbound left turn lanes and a southbound right turn lane, culvert replacement and extension, rumble strip replacement, overlay and re-striping in Montezuma County |
Oldcastle SW Group |
|
Nov 19 |
FSA 172A-019 (19908R) ~ At SH172 and SH151 in the Town of Ignacio, installation of a traffic signal with lighting, placement of an 8 inch concrete pavement, concrete sidewalk and curb ramps, final signing and striping in La Plata County |
Technology Contstructors |
|
Aug 6 |
FSA 172A-019 (19908) ~ Installation of a Traffic Signal with lighting, placement of 8 inch concrete pavement, concrete sidewalk and curb ramps, & final signing and striping in La Plata County |
N/A |
No Bids |
May 28 |
FSA 5502-072 (18928) ~ At 3 work zones between US 550 MP 77.0 and 90.21, work includes replacement of existing cribwalls, minor widening of US 550 from MP 79.13 to 79.36, addition of new guardrail, addition of MSE and soil nail walls, replacement of three cross culverts, disposal of excavated rock and rehabilitation of roadway surfacing in Ouray and San Juan Counties |
Rock & Co |
|
Oct 8 |
FSA R200-199 (19682) ~ Traffic Signal Improvements at SH96A & Grand, SH96A & Court, SH96A & Main in Pueblo; SH24A & West, SH24A & Baldwin, SH24A & Fairview, SH24A & Morning Sun in Woodland Park; SH24G & Garrett; and SH67A & SH115 in Florence in El Paso, Teller, Fremont and Pueblo Counties |
N/A |
Rejected |
Feb 5 |
IM 0251-343 ~ I-25 North of Trinidad, 2.5" mill and fill of roadway with minor bridge and deck repairs and some guardrail replacement in Las Animas County |
APC Southern Construction |
|
Apr 2 |
IM 025A-027 (20319) ~ At the Raton Pass, South of Trinidad, work consists of rockfall mitigation on I-25 in Las Animas County |
Midwest Rockfall |
|
Apr 9 |
IM 0703-381 (18763R) ~ Eisenhower Johnson Memorial Tunnel roof repair on I-70 MP 213 to MP 216 including removal of structure (concrete roof/topping slab on the West and East ventilation buildings), bridge drain (special), waterproofing (membrane), bridge compression joint sealer bride expansion device (0-4 inch), and concrete Class D (special) in Summit and Clear Creek Counties |
Myers and Sons Construction |
|
Feb 19 |
IM 0705-079 ~ I-70, concrete overlay and reconstruction with minor bridge rehabilitation to four structures in Kit Carson County |
Castle Rock Construction Co. |
|
May 7 |
IM 0762-049 (19228) ~ On I-76, 3" overlay with FDR of shoulders, bridge improvements for C-23-E and F and new Bridge rail and paving at structures C-22-BL, C-23-AT and C-23-AR, replace guardrail, new striping and delineation in Logan, Morgan and Washington Counties |
Simon Contractors |
|
Apr 2 |
ITS SW01-527 (20236) ~ On I-70 mountain corridor: fiber optic backbone replacement, Ethernet upgrade and its equipment in Clear Creek, Eagle, Jefferson and Summit Counties |
Paonia |
|
Apr 9 |
ITS SW01-535 (20281) ~ Statewide VMS controller upgrade in various counties |
Interface Communications |
|
Jun 18 |
ITS SW01-536 (20283) ~ Throughout R3 and R5, replacement of several VMSs, remove guardrail and old signs, guardrail installation, underground conduit, drilled caissons, erect new sign structures, power the signs and set up communication to the signs in various counties |
ADB Companies |
|
Jul 16 |
ITS SW01-582 (20560) ~ Throughout Regions 1 and 4, replacing several Variable Message Signs |
Interface Communications |
Bid Tab |
Jan 8 |
MP 0251-347 ~ R2 traffic project to remove and install signs along I-25, SH1b, US50b & US24G in Huerfano and Pueblo Counties |
Arrow Electric Service |
|
Dec 17 |
MP 0251-349 (21163) ~ On SB side of I-25 and US 50B, removal and installation of highway signs in Huerfano, Pueblo, and Otero Counties |
Work Zone Traffic Control |
|
Feb 5 |
MP R200-214 ~ CDOT In Region 2, traffic & safety project, upgrading of eithernet switches and their assy. for the installation of fiber optic cable, conduit, controllers & hardware at 12 signal and 3 node locations in El Paso and Pueblo Counties |
N/A |
|
Mar 5 |
MP R200-214 (20576R) ~ Region 2 traffic and safety project upgrading Ethernet switches and their assy; for the installation of fiber optic cable, conduit, controllers and hardware at 12 signal zones and 3 node locations in El Paso and Pueblo Counties |
Glaser Electric Company |
|
Jul 9 |
MP R200-227 (21018) ~ On I-25 Region 2 striping in Fremont, Huerfano and Las Animas Counties |
Kolbe Striping |
Bid Tab |
Dec 10 |
MP R200-229 (21139) ~ Throughout R2, furnish and construct full operational variable message signs at 5 locations, in Pueblo County(3), Kiowa(1) and Prowers Counties(1) |
Interface Communications |
Bid Tab |
Apr 2 |
MTCE 060A-017 (20224) ~ On SH60, upgrade existing curb ramps to ADA, remove existing curb and gutter, sidewalk and curb ramps and installation of curb ramps and detectable warnings, transitional sidewalks, curb and gutter, temporary traffic control, temporary and permanent striping and pavement marking in Weld County |
N/A |
Cancelled |
Feb 5 |
MTCE 070A-022 ~ I-70, installation of preformed plastic pavement marking (Type I)(Inlaid) on the centerline skips in both directions and installing preformed plastic pavement markings (Type II)(Inlaid) on the centerline skips in both directions in Garfield and Mesa Counties |
Kolbe Striping Inc. |
|
Feb 19 |
MTCE 070A-023 ~ On I-70, grinding existing pavement markings and refreshing with inlaid modified epoxy pavement marking materials in Eagle, Garfield, Mesa and Summit Counties |
Innovative Marking Systems, Inc. |
|
Mar 5 |
MTCE 184A-004 (20072) ~ On SH184, FY15 overlay with HMA (patching) (asphalt), HMA (grading SX)(75)(PG 58-28), epoxy pavement marking and traffic control in Montezuma County |
Oldcastle SW Group |
|
Mar 5 |
MTCE R100-222 (20218)~ Region 1 striping: modified epoxy, preform plastic tape, and preformed thermos plastic in various counties statewide |
Roadsafe Traffic Systems |
|
Mar 12 |
MTCE R100-225 (20426) ~ Region 1 signing project on I-25, C-470 and SH83 in Douglas and Jefferson County |
WL Contractors |
|
Sept 24 |
MTCE R100-236 (20698) ~ On I-70 between Lowell Blvd. and Pecos St. with removal of 3 overhead sign bridges, installation of 7 monotube overhead sign cantilevers (1 provided by department), drilled caissons, traffic control, erosion control, and incidental work in Denver County |
WL Contractors |
|
May 14 |
MTCE R300-210 (20109) ~ On US6F and SHs 9C 9D, 14A, 14B, 125A, 82A and 91A, work includes refreshing existing crosswalks, stop bars, word and symbol pavement markings with inlaid preformed thermoplastic material. All stencils will be 125 mil preformed thermoplastic and all stencils shall be milled into the pavement surface to a depth of 90 mils + 10 mils in Clear Creek, Jackson, Pitkin and Summit Counties |
Roadsafe Traffic Systems |
|
Mar 5 |
MTCE R300-220 (20569) ~ In Region 3, work on roundabouts including removal, supply and application of epoxy pavement marking and preformed thermoplastic word/symbol and crosswalk stencils as designated by the engineer and in the tabulation of pavement markings; highways will include 6D, 6E, 9C I-70A ramps, 82A and 340A; and all pavement markings and stencils shall be ground to create a recessed grove except where such groove already exists in Eagle, Garfield, Mesa, Pitkin and Summit Counties |
RDP Barricade Co. LLC DBA Colorado Barricade |
|
Apr 2 |
MTCE R400-335 (20399) ~ Throughout Region 4 epoxy pavement markings in Lincoln, Washington and Yuma Counties |
Kolbe Striping |
|
Jul 23 |
MTCE R400-342 (20935) ~ R4, throughout the region, pavement marking removal and epoxy pavement marking including sections of 6I, 6J, 6Z, 34B, 34E, 52B, 63A, 113A, 138A and 138Z in Logan, Morgan and Washington Counties |
Innovative Marking Systems |
|
Sept 17 |
MTCE R400-344 (20937) ~ In the NE section of Region 4, removal of existing pavement markings and placement of new preformed thermoplastic pavement markings in Logan, Washington and Yuma Counties |
Roadsafe Traffic Systems |
|
Feb 19 |
MTCE R500-164 ~ Striping various highways in Region 5 using both epoxy and high build water paint in Chaffee and Montezuma and Saguache Counties |
Pavement Marking, Inc. |
|
Aug 27 |
MTCE R500-176 (20883) ~ On SH62, 55 and US160 at Pagosa and La Veta Pass: installation of new and replacement 31 inch guardrail in Archuleta, Costilla, La Plata and San Miguel Counties |
Gonzales Construction Company |
|
Oct 22 |
MTCE R500-177 (20905) ~ Replacement of signs throughout region 5 on SH's 17, 491, 160, 50, 24, 285, 114 and 145 with pedestrian crosswalk in Blanca on US 160 upgrade to RRFB ped activated pushbuttons and LED ped signs in Archuleta, La Plata and Rio Grande Counties |
ACM Construction |
|
Apr 9 |
NH 0242-054 (19108) ~ On US24, addition of passing/climbing lanes at two sites to improve safety and reduce travel times for traffic climbing Trout Creek Pass, including widening, roadway realignment, grading, drainage, improvements, paving, traffic control management, signing and striping with one site requiring rock excavation in Chaffee County |
Tezak Heavy Equipment |
|
Jun 4 |
NH 0341-081 (19962) ~ On US 34 from I-25 to CDOT West Yard, work consists of continuation of fiber optic cable backbone as well as the installation of CCTV Cameras, dynamic message sign, node building, and associated communication equipment in Larimer and Weld Counties |
Sturgeon Electric |
|
Feb 5 |
NH 0502-069 ~ On US50, resurfacing including cold-in-place recycle, HMA overlay, bridge deck rehabilitation, bridge rail, epoxy pavement marking, rumble strips and construction traffic control in Gunnison County |
Oldcastle SW Group Inc. |
|
May 14 |
NH 0851-008 (20172) ~ On US85, rotomill and 4 1/2 inch HMA overlay, ADA curb ramps, bridge deck repair, guardrail reset, bridge rail reset, signal reset, and striping in El Paso County |
Edw. C. Levy Co d/b/a Schmidt Construction |
|
Apr 16 |
NH 0853-096 (20365) ~ Resurfacing on US85 NB to Ft. Lupton in Weld County |
Aggregate Industries |
|
Mar 5 |
NH 1281-014 (19498) ~ ON SH128 from Eldorado to SH121, resurfacing consisting of rotomilling existing pavement, removing geotextile fabric, full depth asphalt replacement at various locations, repaving with HMA, installing truncated domes on curb ramps, adjusting guardrail, signing and striping in Broomfield and Jefferson Counties |
Martin Marietta Materials |
|
Apr 16 |
NH 2873-176 (20099) ~ On US287, resurfacing Harmony to Mulberry, HMA, milling, traffic control, concrete curb and gutter repairs in Larimer County |
Martin Marietta Materials |
|
Oct 22 |
NHPP 030A-032 (20248) ~ On SH30A west of I-225 replace structure F-17-GP, install new pedestrian curb, ramps, and install new sidewalk form Vaughn Street to Potomac Street in Arapahoe County |
Structures, Inc. |
|
Nov 5 |
NHPP 0402-089 (20549) ~ On US 40 MP 146.5-155 Rabbit Ears E. includes a full-width 2" mill and fill, guardrail replacement, surgical repair of the roadway subgrade, delineator replacement, striping, and installing rumble strips in Routt, Grand, and Jackson counties |
Elam Construction Inc. |
|
Mar 5 |
NHPP 0502-073 (19629) ~ On US50 MP 198.96-210, roadway surface treatment, addition of a slow vehicle pullout, bridge deck structure maintenance, drainage improvements; surface treatment including 1” leveling course and 1.35” overlay; slow vehicle pullout is located at MP 206.5 which will improve travel times for EB traffic; work will be done on structure J-12-AA to maintain structural integrity of the deck, add waterproofing and upgrade bridge rail; drainage will be improved by adding drop inlets, slope and ditch paving; signing, striping, guardrail and shouldering in Chaffee and Gunnison Counties |
A&S Construction |
|
Jun 11 |
NHPP 050A-026 (20674) On US50 MP 220-223, removal and installation of new pavement markings made of methyl methacrylate, and both (waterborne) and (high build) pavement marking paint in Chaffee County |
Kolbe Striping |
|
May 7 |
NHPP 062A-018 (20332) ~ On SH 62, a two lift Chip Seal which includes the placing of a Type II Cover Coat (1st lift) followed by a Type I Cover Coat (2nd lift); both lifts will utilize CRS-2P Emulsion; two lift chip seal shall then have a fog seal emulsion applied; temporary striping shall be required after placement of chips and after the fog seal; and final Epoxy Striping shall be applied seven calendar days after the fog seal in Ouray and San Miguel Counties |
Intermountain Slurry Seal |
|
Oct 22 |
NHPP 0701-221 (19674) ~ On I-70 excavation and placement of new 24" irrigation culverts with fencing, HMA, inlet Type D and striping in Mesa County |
Mountain Valley Contracting |
|
Jul 9 |
NHPP 0701-223 (19911) ~ On I-70 at Exit 31, modern style roundabouts including unclassified excavation, aggregate base course, HMA, concrete pavement, drainage pipeline installation, curb, gutter and sidewalk in Mesa County |
M.A. Concrete Construction |
|
Jan 22 |
NHPP 0701-225 ~ On I-70, 2" mill and fill, bridge rail, delineators, guardrail, temperature sensors and striping in Mesa County |
Elam Construction, Inc. |
|
Jan 29 |
NHPP 0702-336 ~ At I-70A, installation of cured-in-place linings, outlet and inlet revetment maintenance, culvert replacements by open trench or jacking pipe under the road, erosion control and traffic control in Eagle County |
American West Construction |
|
Oct 22 |
NHPP 0702-337 (19490) ~ On I-70, extend eastbound chain-up station at MM 178.4, approximately 1,500 ft. to the west, widening, installation of wall, drainage improvements, and installation of chain station lighting, replace existing chain-up station lighting in Eagle County (Sch. A and B includes installation of fiber optic cable at eastbound I-70 chain-up station & station lighting at westbound I-70 chain-down station at MM 178.7; Schedule A includes installation of closed circuit cameras at eastbound I-70 chain-up station) |
SEMA Construction |
Bid Tab |
Aug 6 |
NHPP 0702-337(19490) ~ Extend EBI-70 chain-up station, includes widening I-70, installation of wall, drainage improvements, installation of chain station lighting. Schedule A and B includes installation of fiber optic cable at EB I-70 chain-up station and chain station lighting at WB I-70 chain-down station. Schedule C includes installation of closed circuit cameras at EB I-70 chain-up station in Eagle County |
N/A |
No Bids |
Feb 5 |
NHPP 0702-347 ~ On I-70, work on 7 bridges including various combinations of bridge deck pavement removal, installation of waterproofing membrane, pavement replacement, replacement of bridge joints, striping and traffic control in Eagle County |
ABCO Contracting Group |
|
Mar 12 |
NHPP 0703-409 (19941) ~ On I-70 at MP 213.65 extending approximately 12.9 miles East to MP 226.5, removal of 2.5” of HMA by planning and a 2.5” HMA pavement overlay at the eastbound travel lanes, and structural repairs at four bridges (F-13-O, F-13-P, F-13-S and F-14-AN) in Clear Creek County |
APC Southern Construction |
|
Feb 5 |
NHPP 0703-412 ~ On I-70, widening of the east bound on ramp from Grapevine Road to create an additional lane on the on-ramp that merges with the existing on-ramp lane in Jefferson County |
K.E.C.I. Colorado Inc. |
|
Mar 09 |
NHPP 0703-418 (19984-COMBO) ~ CMGC CAP Award |
Mountain Corridor Constructors | |
Dec 17 |
NHPP 0703-425 (20368) ~ Lining of existing culvert conveying Hamilton Gulch under I-70 at MP 211.68 in Summit County |
American West Construction | |
May 28 |
NHPP 076A-008 (19958) ~ Widening & retaining wall for eastbound offramp from I-76 to 88th & 88th & Brighton Rd.; 3 signal replacement at interchange in Adams County |
Jalisco International |
|
Mar 5 |
NHPP 1601-070 (19632) ~ On US160 from Mancos Hill to Hesperus, resurfacing project including 1” HMA ST leveling with a 1 ½” HMA SX overlay, US160 crown correction between MM 67-69, guardrail removal and replacement, culvert and inlet cleaning, snow fence installation, row fence removal and replacement, re-striping, rumble strip replacement, ditch cleaning, remove and replace three culvert end sections in La Plata and Montezuma Counties |
Oldcastle SW Group |
|
Feb 5 |
NHPP 1602-143 ~ On US160 resurfacing including a leveling course plus 1.5 inch HMA overlay, guardrail replacement, shouldering, signing and striping, rumble strips, milling and two deep patches in Archuleta and La Plata Counties |
Oldcastle SW Group Inc. |
|
Mar 26 |
NHPP 1602-146 (20154) ~ On US160 from MM 186.3 to 201, surface treatment project involving a chip seal and restripe in Rio Grande County |
Oldcastle SW Group Inc |
|
May 14 |
NHPP 1603-033 (20431) ~ On US160 from ~ MP 234.00 to ~ MP258.36 and work consists of chip sealing the full width of the existing roadway, fog coat, and final striping. A double chipseal application will be required at various intersections in Alamosa and Costilla Counties |
A-1 Chip Seal |
|
Feb 5 |
NHPP 2254-088 ~ On I-225 South in various locations, bridge deck repair, polyester concrete overlay, bridge expansion joint removal and replacement in Adams, Denver and Arapahoe Counties |
Myers & Sons Construction |
|
Dec 17 |
NHPP 4912-005 (19399) ~ Removal of 39,000 sy of asphalt pavement, placement of 38,000 sy of 8" Concrete pavement. 13,888 tons of HMA Replacement of 21, street lights, installation of 4,500 LF of C and G Type 2, installation of 5,600 LF of electrical conduit, signing and striping in Montezuma County |
Project Cancelled |
N/A |
Jan 29 |
NHPP 5502-077 ~ On US550, rock scaling, rock excavation, rock reinforcement, mesh anchors, draped mesh and cable netting, 1.5 inch HMA overlay, HMA patching and striping, shoo-fly detour in Ouray County |
Rock Solid Solutions |
|
Oct 29 |
NHPP 5502-079 (19909) ~ US550 N. of Ouray, replacement of existing CMP with Concrete Box Culvert. Minor signing, painting, and pedestrian railing in Ouray County |
Mueller Construction Services |
|
Aug 13 |
NHPP 5502-086 (20650R) US 550 MP 47.5 TO 49.0: remove and install pavement markings, install six luminaires with foundations, standards and conduit in La Plata County |
Glaser Electric |
Bid Tab |
Jul 9 |
NHPP 5502-086 (20650) ~ On US550 MP 47.5 to 49.0, remove and install pavement markings, install 6 luminaries with foundations, standards and conduit in La Plata County |
N/A |
No bids |
Jul 23 |
NHPP R100-231 (20515) ~ On I-76 at I-70, SH121 & I-70 at US6, clean out of debris form work and organic materials, traffic control, erosion control and confined space entry in Jefferson County |
American West Construction |
|
Jul 9 |
NHPP R200-216 (20639) ~ Installation of Hybrid Ped Beacon (HAWK) system, replacement of damaged signal pole, and installation of rectangular rapid flashing beacon (RRFB) and school zone flashing beacons in Woodland Park, Lamar, McClave, Fountain & Colorado Springs in Bent, El Paso, Prowers and Teller Counties |
N/A |
Project Cancelled |
Oct 15 |
NHPP R200-216 (20639R) - Installation of Hybrid Pedestrian Beacon (HAWK) system, replacement of damaged signal pole, and installation of rectangular rapid flashing beacon (RRFB) and school zone flashing beacons in Woodland Park, Lamar, McClave, Fountain & Colorado Springs in Bent, El Paso, Prowers and Teller Counties |
N/A |
No Bids |
Apr 30 |
NHPP R600-440 (19656) ~ On US40,m MP 298.7 to 300.7, resurfacing with milling 2" of existing pavement and overlay 2.5" HMA, reconstruction of curb ramps to meet ADA standards, adjust manholes, valves box and inlet protection in City and County of Denver |
N/A |
|
Mar 5 |
SHE 0212-006 (19500S) ~ On SH21, acceleration and deceleration lanes: outside widening is a typical width of 16 feet, curb & gutter in some areas and coordinate with utility owners in El Paso County |
SEMA Construction |
|
Apr 30 |
SHE 0504-070 (19884) ~ On US50B, installation of turning lanes including addition of a turn acceleration/ deceleration lane, continuous acceleration/deceleration lanes, extension of turn acceleration lane to standard length and provide storage in Pueblo County |
Martin Marietta Materials |
|
Jun 18 |
SHE 0703-428 (20552) ~ On I-70 from C-470 to 32nd Ave., installation of cable rail barrier in the median, re-grade two dirt, emergency turnarounds, build a new turnaround and replace all Type I delineators on both sides of the median in Jefferson County |
N/A |
No bids |
Dec 17 |
SHE 0703-428 (20552R) ~ On I-70: C-470 to 32nd Ave., installation of cable rail barrier in the median, paving two existing dirt emergency turnarounds, constructing and paving one new turnaround, replacing all Type I delineators on both sides of the median, resetting or replacing end anchorages and adding Type 3 guardrail at four locations on C-470 in Jefferson County |
Cruz Construction |
|
Apr 16 |
SHE 151A-008 (19762) ~ On SH151, widening to provide a center left turn lane for CR 521 and 321 in La Plata County |
N/A |
Project Cancelled |
Jun 25 |
SHE 151A-008 (19762R) ~ On SH151, widening to provide a center left turn lane for CRs 521 and 321 in La Plata County |
Tricon 2 |
|
Mar 26 |
SHE 1602-151 (20430) ~ Wildlife crossing at dry creek, project includes wildlife crossing under US160, retaining wall, wingwalls, excavation, embankment, HMA paving, deer fence, wildlife jumpouts, temporary and permanent striping in La Plata County |
Crossfire, LLC |
|
Jun 11 |
SHE 165A-012 (19680) ~ On SH 165 between Rye and I-25, construction of left turn lanes at Crow Cutoff and Applewood Dr., HMA roadway construction, striping and rumble strip installation in Pueblo County |
Tony J. Beltramo and Sons |
|
Apr 16 |
SHE 172A-018 (19740) ~ On SH172, MP 21.5 TO 22.5, highway widening and overlay in La Plata County |
N/A |
Project cancelled |
Jun 25 |
SHE 172A-018 (19740R) ~ On SH 172, MP 21.5 to 22.5, highway widening and overlay in La Plata County |
Tricon 2 |
|
Jun 11 |
SHE R100-235 (20688) ~ On US285, safety improvement project to include install cable barrier in median, gutter type 2, striping, and rumble strips in Jefferson County |
N/A |
No bids |
Jul 2 |
SRP 052A-032 (17268) ~ On SH52 in Hudson, upgrade of railroad crossing: removal of sidewalk, removal of curb ramp, removal of asphalt mat, concrete sidewalk, concrete curb and gutter, HMA patching, pipe installation, chain link fencing, erosion control, seed, mulch and traffic control in Weld County |
Technology Constructors Inc. |
|
Apr 16 |
STA 006A-045 (17798) ~ On SH6, MP 257.05 to MP 260.05, resurfacing, HBP, guardrail, clean culverts, concrete sealer, ruble strips and striping in Clear Creek County |
Brannan Sand & Gravel |
|
Feb 19 |
STA 0131-063 On SH 13 at MP 85.8, includes repair of Bridge C-06-D over the Yampa River, including bridge replacement, bridge rail replacement, installation of new columns, caps & guide bank reconstruction in Moffat County |
New Design Construction Company |
|
Nov 5 |
STA 0131-065 (20102) ~ Reconstruction on SH13 minor widening, replace minor structures, earthwork, fencing, guardrail and asphalt paving in Rio Blanco County |
Old Castle SW Group Inc. |
|
Mar 19 |
STA 0131-066 (20219) ~ On SH13 resurfacing at two sites. The work at the site north of Meeker includes 2” planning and 2” HMA overlay and the site north of Craig includes 1.5” overlay and some spot repairs. Additional work will include guardrail repair and replacement in Rio Blanco County |
Elam Construction |
|
Dec 17 |
STA 0132-019 (20548) ~ On SH13, surface rehabilitation MP 98.0 to 104.0 with shouldering, removal and replacement of existing guardrail, striping, and culvert repairs at Structure B-07-S over Fortification Creek MP 100.6 (Alt. Bid Project) in Moffat County |
Castle Rock Construction Company of Colorado |
|
May 7 |
STA 0142-051 (17136R) ~ On SH 14 from I-25 east to CR 23, project consists of two no-rise sections of roadway requiring milling and paving, majority of work to be overlaying existing roadway, culvert repair and replacements, installation of guardrail and delineators--this is an alternate bid project between 8" emulsified full depth reclamation with 5.5” HMA or 8" PCCP overlay in Larimer and Weld Counties; note: this project will also utilize Cost Plus Time Bidding |
Interstate Highway Construction |
|
Mar 5 |
STA 016A-042 (20225) ~ On SHs16 & 21, resurfacing including rotomilling, unclassified excavation, embankment, geogrid, full depth reclamation of HMA pavement, aggregate base course, HMA, traffic signal, erosion control, epoxy pavement marking, inlaid pavement marking, and traffic control in El Paso County |
Rocky Mountain Materials & Asphalt |
|
May 21 |
STA 023A-002 (20310) ~ ON SH23 Holyoke to the state line, HMA, full-depth reclamation and geotextile transverse crack repair in Phillips and Sedgwick Counties |
Simon Contractors |
|
Jun 4 |
STA 0241-057 (18266) ~ On SHs24, 50 and 348: replacement of the existing culvert structures, temporary culverts, grading, paving, pavement widening, guardrail and bridge rail, temporary signals, traffic control, erosion control, signing and striping, sanitary sewer, and a cured in place pipe (CIPP) pipe treatment to an existing culvert in Eagle and Montrose County |
N/A |
No bids |
Jul 30 |
STA 0241-057 (18266R) ~ Project on three roadways in Region 3, on US24, MP 147.12, work consists of replacement of existing 14'x8.5' cross creek culvert structure 024A147120BR and approaches with a 20'x8' concrete box culvert with temporary culverts, grading paving, pavement widening, guardrail and bridge rail, temporary signals, traffic control, signing and striping, and sanitary sewer replacement; on SH348, MP 6.64, work consists of the replacement of the existing culvert with a 8'x10' concrete box culvert with temporary culverts, culvert replacement, grading, paving, striping, erosion control and temporary traffic control; on US50, MP 108.80, work consists of a cured in place pipe (CIPP) pipe treatment to an existing culvert in Eagle and Montrose Counties |
N/A |
Cancelled |
Oct 1 |
STA 0252-441 (20472) ~ On I-25, concrete pavement repairs at I-225 (MM 200) in Denver County |
New Design Construction Company |
|
Jul 30 |
STA 0341-080 (19959) ~ Implementation of a traffic adaptive signal timing control system at six (6) intersections on US34, MP 107.6-112.6and six (6) intersections on US85, MP 266.650 to MP 268.489 to improve traffic operations in Weld County |
Sturgeon Electric |
|
Jul 16 |
STA 0343-039 (20700) ~ On US34 at Yuma County Roads H & J, MP 225-226.8, intersection improvements including compaction, asphalt paving, signing and striping and seeding in Yuma County |
McAtee Paving Co. |
|
Feb 19 |
STA 0362-034 ~ On US36: Cabin Creek MP 118.4 to MP 120.0, work to include removal of mat planning, erosion control, placement of HMA, seeding and striping in Arapahoe County |
Martin Marietta Materials, Inc. |
|
Jul 23 |
STA 0451-010 (19653) ~ On SH 45 between MP 0 - 5.385, milling, asphalt overlay, ADA ramps, traffic control, striping, and other items as indicated in the plan set in Pueblo County |
Martin Marietta Materials, Inc. |
|
Feb 12 |
STA 0471-100 ~ On SH47, 2.5" mill and fill safety improvements: concrete curb ramp and pedestrian push button work, minor bridge work, and re-decking of structure K-18-EL in Pueblo County |
Martin Marietta Materials, Inc. |
|
Aug 27 |
STA 056A-005 (19724) ~ Resurfacing of SH 56 from East of Berthoud to I-25 in Larimer and Weld Counties |
Asphalt Specialties Co. |
|
Mar 5 |
STA 0581-011 (19456) ~ On SH58 resurfacing from US6/SH93 to I-70, 1” HMA 2” SMA, guardrail replacements, minor ramp widening, minor bridge fixes and signal head upgrades in Jefferson County |
APC Construction Co. |
|
CMGC |
STA 0702-327 (19094) ~ I-70 Vail Underpass CMGC Construction |
Kraemer North America LLC |
|
Dec 11 |
STA 0702-327 (19094) ~ CMGC CAP Award |
Kraemer North America LLC |
|
Aug 26 |
STA 0702-362 (21094) ~ I-70 Vail Underpass Phase 1 CMGC in Eagle County |
Kraemer North America LLC |
|
Aug 26 |
STA 0702-362 (21094) ~ CMGC CAP Award |
Kraemer North America LLC |
|
Aug 20 |
STA 0703-426 (20510) ~ I-70 West Overlay: MP 218 TO EJMT: resurfacing using SMA, Guardrail Remove and Replacement & Guardrail Reset in Clear Creek County |
APC Southern Construction Co. |
|
Jan 8 |
STA 071A-016 ~Region 4; CHIPS SH 71 AND SH 59 Minor HMA Overlay in Washington and Yuma Counties |
McAtee Paving Co. |
|
Mar 19 |
STA 0853-070 (17018) ~ On US85, HMA, ABC, embankment, full depth reclamation, milling, box culvert extensions, structure rehabilitation, culverts, seeding and mulching, erosion control, singing, striping, rumble strips, weather station, and road closure gates in Weld County |
Connell Resources |
|
Mar 26 |
STA 094A-033 (19015) ~ On SH94 Ellicott East to El Paso/Lincoln CL, work consists of 2" mill and fill resurfacing from MM 17.200 to MM 35.010, bridge deck rehabilitation and bridge rail replacement on the following structures: I-19-AJ, I-19-B, I-20-AM, I-20-AO, I-20-AN, I-20-H, and I-20-Y in El Paso County |
Kiewit Infrastructure Co. |
|
Mar 5 |
STA 160A-025 (19255) ~ On US160 1 ½” overlay with additional full depth patching and bridge replacement project in Las Animas County |
APC Southern Construction |
|
Nov 5 |
STA 2873-100 (12372) ~ On SH287 from SH 1 to Laporte Bypass, 2 miles concrete pavement, 3 intersection reconstructions including a roundabout, 1,000 HMA resurfacing, retaining and noise walls, irrigation ditch relocation, building and structure removals, earthwork and grading, water quality vaults, street lights, public information services, surveying, removal of trees, asphalt paving and patching, seeding, mulching, and pavement markings in Larimer County |
Lawson Construction Company |
|
May 21 |
STA 340A-017 (19772) ~ On SH340, MP 13.55 to MP1.98, access improvement project with added turn lanes and shoulder widening on SH340 at the Kings View Road Intersection in Mesa County |
Mountain Valley Contracting |
|
Aug 6 |
STA 391A-013 (19549) ~ On SH391 (KIPLING ST.) 2 inch mill & fill from 6th to Jewell. Median improvements, 1 signal replacement, minor widening, guardrail from 6th to Alameda in Jefferson County |
Brannan Sand and Gravel |
|
Mar 26 |
STA 3921-013 (19163) ~ On SH392 Windsor to Lucerne, resurfacing and bridge rehabilitation including full depth reclamation of HMA pavement, HMA, unclassified excavation, removal of asphalt mat, aggregate base course, structure resurfacing and bridge rail, guardrail, striping, signs and seeding in Weld County |
Coulson Excavating |
|
Jan 8 |
STA R300-213 ~ On SH125, chip seal (Type 1 Chips 3/8 inch, cover coat and fog seal), bridge rail upgrades and guardrail improvements in Grand Jackson and Routt Counties |
Oldcastle SW Group, Inc. |
|
Apr 30 |
STA R300-218 (20562) ~ SH349 MP 17.02 to 17.02, SH90 MP 81.53 to 88.97, US550 Frontage Roads MP 83.49 to 84.67 and 87.95 to 90.1, work consists of HMA patching, chip seal resurfacing, traffic control and pavement marking in Delta and Montrose Counties |
Oldcastle SW Group, Inc. |
|
Jan 8 |
STA R500-160 ~ R5 Project, removal of HMA, Class 2 and 3 deck repairs, install waterproofing membrane, replace expansion devises, place HMA and re-stripe in Archuleta, Dolores and La Plata Counties |
GA Western Construction |
|
Apr 16 |
STL R200-212 (20460) ~ Project consists of improvements at four CDOT Park and Ride locations along I-25 in El Paso and Larimer counties |
KECI of Colorado |
|
Nov 12 |
STM 021A-003 (19565) ~ US24/SH21(Powers Blvd), Fountain Blvd to Platte Ave, and Airport Road in Colorado Springs consisting of widening and noise wall, including unclassified excavation, aggregate base course, hot mix asphalt, traffic signals, lighting, drilled caissons, precast wall panels, drainage pipes, erosion control, epoxy pavement marking, inlaid pavement marking, and traffic control in El Paso County |
SEMA Construction Inc. |
|
Jan 15 |
STM 012A-046 ~ On SH12 near Cucharas removal of existing structure and replacement of a new box culvert with milling, paving, structure removal, structure installation, traffic control, guardrail installation, and striping in Huerfano County |
Kiewit Infrastructure Co. |
|
Jul 30 |
STM R200-198 (19657R) ~ Project has 5 sites around Region 2. Work will include removal and replacement of concrete pavement, completion of cross stitching, installation of curb ramps and truncated domes, replacement of pedestrian push buttons, installation of curb and gutter, polyurethane sleeper and slab jacking, and other items as indicated in the plan set in El Paso, Fremont and Pueblo Counties |
Tony J. Beltramo and Sons |
|
May 14 |
STM R200-198 (19657) ~ At 5 sites around Region 2, work includes removal and replacement of concrete pavement, completion of cross stitching, installation of curb ramps and truncated domes, replacement of pedestrian push buttons, installation of curb and gutter, polyurethane sleeper and slab jacking, and other items as indicated in the plan set in El Paso, Fremont and Pueblo Counties |
N/A |
|
Apr 23 |
STR 0711-017 (20487) ~ On SH 71, MP 18.9 and 27.0, 8" full depth reclamation with a 3 inch overlay from MP 18.9 to 25.5 and a 2 inch mill and overlay from MP 25.5 and 27.0--project will include sign replacement, temporary and permanent striping, replacement of bridge rail with guardrail replacement at that location, and installation of waterproof membrane on bridges in Crowley and Otero Counties |
A&S Construction |
|
Aug 13 |
STR 141A-038 (20380) ~ On SH 141, MP 41.51, MP 43.49, MP 44.89, and MP 54.91: lining six large culverts, placement of concrete headwalls and wingwalls, pipe removal, excavation, rirap scour protection, wetland seeding with plugs and brush layer cuttings, and final seeding and mulching in San Miguel and Montrose Counties |
American West Construction |
|
May 21 |
STR R200-205 (20122) ~ At 4 locations east of Pueblo, work includes lining culverts that vary in size from 36 inches to 84 inches, erosion control, traffic control, cleaning culverts, resetting fence, and other items in Bent, Crowley, Las Animas, Otero and Prowers Counties |
Tezak Heavy Equipment |
|
Jul 9 |
STR R500-166 (20687) ~ Throughout R5, remove HMA, Class 2 & 3 Deck repairs, install waterproofing membrane, replace expansion devises, place HMA, restripe in Chaffee, Gunnison and Saguache Counties |
TLM Constructors | Bid Tab |
Nov 12 |
STU 1211-084 (19868) ~ On SH121 (Wadsworth)-Highland Drive-10th Ave. full construction with widening of one lane in both directions and a multi modal trail on both sides, the mainline paving will be concrete, work also includes a concrete box culvert near Highland to carry Lakewood Gulch under Wadsworth in Jefferson County |
SEMA Construction Inc. | Bid Tab |
Jul 30 |
TAP 0703-382 (18807) ~ On the north side of I-70, MP 251.4 to MP 253.8, work includes constructing 2.4 mile long, 10 ft. wide concrete bike path and placing a prefabricated pedestrian bridge at the Genesee Buffalo Herd Overlook with relocating a CDOT fiber optic line, constructing minor drainage improvements, placing permanent signing and pavement markings, and performing erosion and traffic control management in Jefferson County |
Hamilton Construction | Bid Tab |